HomeMy WebLinkAbout09-23-1986 PTRC Meeting Minutes AGENDA
Regular Parks and Recreation Committee Meeting
Village of Arden Hills
Tuesday, September 23, 1986 - 7:30 p.m.
Village Hall
1. Call to Order and Roll Call
2. Approval of Minutes, July 29, 1986
3. Council Report
4. 1987 Park Department Budget
i g r�
J. VWllalli s Park RepVr,
A. Lights
B. Shelter
C. Rink
6. North Snelling Park Report
• 7. Flower Garden and Landscape Contest Video
8. Miscellaneous/New Business
9. Adjournment
Please call John or Shirley, 633-5676, if you cannot attend this meeting.
•
. Minutes of Regular Parks and Recreation Committee Meeting
Village of Arden Hills
July 29, 1986
Village Hall
Call to Order
The meeting was called to order at 7:40 p.m. by Chairman Sand.
Roll Call
Present: David Sand, Adele Anderson, Don Messerly, Alan Montgomery, Tom
Mulcahy, Jim Otto, Mark Peterson
Absent: Gerald Dreyling, Keith Enrooth, Mary Gillies, Jim Mishek
Also Present: Councilman Tom Sather, Parks Director J. T. Buckley
Planner Orlyn Miller
Finance Committee Liaisons Trudy Rautio, Chuck Mertensotto
Approval of Minutes
It was moved by Mulcahy, seconded by Anderson, that the minutes of May 20 be
approved as submitted. Motion carried unanimously.
Cummings Park Hockey Rink, Lighting, and Shelter
Planner Miller presented construction plans and cost estimates for the park
shelter (warming house) previously planned for Cummings Park. (At May meeting
of this committee, Miller had been asked to prepare plans for a garage-type
structure with attractive roof design, large overhangs, and having the front
side extended to create a porch effect - no plumbing).
• Preliminary estimates of the costs of a contractor constructed (stick-built)
versus prefab building revealed that the cost of a contractor constructed
building would be considerably less. Miller is proposing a 20 x 20 foot
building, with a 10 foot overhang in front. The building will have a hip roof
and asphalt shingles. Committee discussed having a shake shingle roof, but
decided against it because shake shingles are (1) more vulnerable to vandalism,
and (2) more flammable. Committee recommends redwood siding. Plans include a
plywood ceiling inside and outside (under overhang). One steel pedestrian door
and one 6 foot wide overhead equipment door are provided. Committee recommends
the equipment door be 8 feet wide. Rationale for this request is that the cost
of an 8 foot door is about the same as a 6 foot door, and the interior will be
more usable for storage purposes with an 8 foot door. Building will be
constructed on a concrete slab.
The quotation does not include cost of electrical wiring. It was Miller's
opinion that wiring could probably be done most economically by the firm
installing the hockey lights. Committee concurred to ask Buckley to get a
quotation for this cost. Committee recommended heating with electric heaters.
Committee further recommends that insulation and interior paneling be added to
the building plans.
Since cost is not expected to exceed $15,000, Committee would like quotations
from several contractors for the building. It would probably take about three
days to prepare the concrete slab; construction time is estimated at three days
to a week.
• Motion was made by Peterson, seconded by Otto, that the following construction
plans for Cummings Park be recommended to Council for approval:
• Minutes of Regular Parks and Recreation Committee Meeting
Page 2
1. Park Shelter (cost not to exceed $15,000) (Plan 1, Miller Report)
a. Foundation slab
b. 20' x 20' building - 10' open bay (roof overhang) in front
c. Hip roof, with 2' overhang (roof size 24' x 32' )
d. Asphalt shingles
e. Redwood siding
f. Plywood ceiling inside and outside (under overhang) to prevent injuries
to skaters inside, and birds nesting outside.
g. One steel pedestrian door, and 8 foot overhead equipment door
h. Interior insulation (fiberglass bat) and paneling (if affordable given
$15,000 limit on expenditure).
2. Lighting of hockey rink and general skating area per Musco proposal (April
30, 1986, at cost not to exceed $8,500. Wiring of shelter by same
contractor, Buckley to negotiate with Musco Lighting for this, at cost not
to exceed $3,000 (total not to exceed $11,500).
'on of hocke
y rink and general skating area at cost not to exceed
3. Constructs y g 8
$15,000. Labor to be provided by Parks maintenance personnel. Boards to
be removed at end of skating season.
Motion carried unanimously.
• North Snelling Park
Miller reported that grading of the playing field area has been completed. The
North Heights Lutheran Church contractor has deposited some top soil in the
area of the pond; it will be his responsibility to grade this area evenly to
the edge of the pond and eliminate the drainage ditch which runs on park
property. Miller and Buckley will monitor to ensure this is done.
When grading is completed, the area will be seeded by Parks personnel (probably
in late August) .
Proposed 1987 Budget
Summer Playground Program
No increases or changes are planned in this budget for 1987.
Rautio asked Committee input re fees for this program, since Finance
Committee last year had discussed raising fees and including t-shirts.
They are now $5.00 per participant. It was determined that Arden Hills'
fees at this time are comparable with neighboring communities; committee
recommends no change in fees, and not including t-shirts.
Skating Rinks
1986 expenditures are anticipated to be about $1,000 over budget, mostly in
Acct. 104 (rink attendants). Last winter's weather was such that the
skating season extended one week longer than normal, and there were fewer
days when rinks were closed.
• The 1987 Budget is increased by approximately $5,000. Two additional rinks
will need to be maintained, and an attendant provided for the new Cummings
• Minutes of Regular Parks and Recreation Committee Meeting
Page 3
Park rink.
Shade Tree Disease Control
This budget for 1987 is increased by approximately $750 for reforestation.
Buckley stated that Arden Hills has done an outstanding job in its diseased
tree program, and the time has come to replant some of the trees lost to
disease.
Self Sustaining Recreation
Revenues are equalling expenditures in this area. The 1986 expenditures
are expected to be $45,500; budgeted amount is $37,735. This overage
occurred because the cities assumed responsibility for the previously
school managed Spring Track Program. Income was $5,496.00, expenditures
$4,597. 14 (income from program - $948.86).
The 1987 budget assumes Arden Hills' continuing to sponsor this program,
and adding a volleyball program previously sponsored by the schools. A
fall softball program is also being added.
Park Fund
Motion was made by Sand, seconded by Montgomery, that because of the rapid
depletion of the Park Fund, the lower amounts being received in recent
negotiations for park dedication, and- the .lack of future available land for
development which is subject to park dedication fees, this committee
recommend to Council that park salaries not be allocated to the Park Fund.
Motion carried unanimously.
The balance in the Park Fund is currently $296,737. Anticipated future
revenue is $115,000. This clearly shows that the fund will be depleted in
the not-far-distant future.
Committee concurred with Buckley's proposed 1987 capital improvements
($55,700).
Park Maintenance Budget
This budget increases. Line items increased are Acct. 212 (Gas and Oil).
This is a two-fill year for the bulk tank (18 month intervals).
Acct. 550, Automotive Equipment, calls for expenditures of $23,500. These
equipment expenditures were called for in the five year plan. The Case
tractor will be replaced (cost shared with Public Works) ($10,000); the
1979 1/2 ton is scheduled to be replaced with a 3/4 ton truck; the very old
flooding truck will be replaced with Public Works' truck, new tank added.
Replacement of a 1980 1-ton truck is also scheduled.
Acct. 109, Park Salaries, increases. Buckley is requesting full time
employees be increased from two to three. During all of 1986, Kevin Fuller
has worked continuously as a temporary, seasonal employee; this was
necessitated by the heavy work load. This budget proposes that he become a
• regular employee, at a total increased cost of $10,400.00, increasing
salary to that comparable to the other two full time employees.
• Minutes of Regular Parks and Recreation Committee Meeting
Page 4
Committee discussed amount budgeted in Acct. 207, Travel, Conference and
Schools. Committee recommends this be increased to $500 to allow more
training time for employees.
Motion was made by Otto, seconded by Montgomery, that the 1987 budget, as
proposed by Buckley and amended by this committee, be recommended to Finance
Committee and Council for approval. Motion carried unanimously.
Fall Program Proposal
1987 Fall Program is identical to 1986's, with one addition. Buckley proposes
beginning an experimental after school program at Valentine Hills School.
Recent studies at the University indicate over 50% of elementary age youngsters
are unattended from the close of school until their parents return from work.
At this time plans for the program have not been made; it is expected to be
totally self-sustaining, that fees will equal costs. It will probably begin
with a one to two day a week program to assess interest in such a service.
Committee unanimously encouraged the formation of such a program and agreed to
assist in any way.
It was moved by Otto, seconded by Montgomery, that the 1987 Fall Program
Proposal be recommended to Council for approval. Motion carried unanimously.
• Flower Garden - Yard Beautification Awards
A subcommittee of Messerly, Mulcahy and Montgomery will meet Monday, August 4,
to tour Arden Hills and then submit recommendations for recipients of these
awards in 1986.
Miscellaneous/New Business
Committee members relayed to Buckley their observations of the fine quality of
work and of how hard the Park maintenance personnel worked. Also mentioned was
the high quality of the playground leadership, especially noted at Cummings and
at Hazelnut parks.
Council Report
Sather reported on Council actions of interest to this committee. Committee
expressed its disappointment in elimination of the sidewalk on the east side of
Hamline Avenue; asked if it could be included at a later date.
Sather stated his observation that the Engineer did not lend credence to Park
committee recommendations regarding Hamline Avenue improvement.
Adjournment
The meeting was adjourned at 10:45 p.m.
•
• Now � - -ro Tu-!W K UC0
pt 0-toTs L-Pi
q IT I-)I C)
�t pr o tj T V 5420 �
- z -
`-Too,r\ K- qou ion, tii v u7u N eT—
C = Q� CTUrt.e `m TRe
w
u �
� pjaoff � t �
•
MEMORANDUM
Date: August 20, 1986
To: Parks and Recreation Committee
From: Shirley
Meeting Cancellation
The Parks and Recreation Committee meeting scheduled for August 26 has
been cancelled. The next meeting will be held September 23, 1986, at the
Village Hall.
At its last meeting, the Council approved the construction plans for
Cummings Park, adding a stipulation that three bids be solicited for each
of the projects. The Fall Park Program was also approved.
John took a really bad tumble while working on a deck for his home. He
• has some cracked ribs, and torn ligaments in his knee, but he's hobbling
around the office anyway.
A
•
Arden Hills Park and Recreation
• Summer Playground Evaluation
1986
Cheryl Fregeau
Program Supervisor
The summer playground operated from June 16 - July 25, a total of six weeks.
June 12 and 13 were spent in orientation and a workshop. As last year, we attended
the Minnesota Recreation and Parks Association workshop in Lakeville, MN. The
workshop was beneficial; the leaders came away with fun ideas to implement into
their weekly planners.
This summer our staff consisted of seven people. The four leaders were Mary
Klonderman Pam Johnson, Lisa Hultman and Sean Thomas. Amy Kostishack and Beth
Hjortaas were hired as assistants. Allan Elfert and Elizabeth Lapinski volunteered
to help out at the parks with higher registrations. Their efforts were greatly
appreciated.
PROGRAM The summer programs were held at Cummings Park, Floral Park, Valentine
Hills School and Hazelnut Park. The Tiny Tots program ran from 9:30 - 11:30 in the
morning for ages 4-6 years old. Morning activities included a craft, games, songs,
stories and play time on the equipment. Afternoon sessions were held at the same
parks form 1:00 - 4:00 and catered to ages 7-12. In addition to games and crafts,
special events were planned to liven up each week.
1986 Park Registration
a.m. p.m.
Floral 39 36
Cummings 32 16
Hazelnut 14 21
Valentine 54 22
a.m. total 137
p.m. total 95
232
ADVENTURE TRIPS These weekly field trips were the highlight of each week.
Below is a list of the field trips and a financial report for each one. Bus fees
almost doubled this summer due to higher insurance rates for bus companies. Two
field trips we rented vans because it was much cheaper. Next year's All Day field
trips could be geared to the younger ages (7-10) . Apple River, which once was a
favorite, had the poorest attendance of all the trips. There has been a turn over
in age groups. Many afternoon kids are coming from the tiny tots.
n
TRIP ATT. TAKE IN ADM. BUS $ PROFIT/LOSS
• Fire Station 50 50.00 ---- 55.00 -5.00
Rollerskating 36 90.00 54.00 78.00 -42.00
Valleyfair 21 269.50 218.50 80.00 -33.00
Twin's Game 25 100.00 75.00 90.00 -65.00
Nature Center 41 41.00 ---- 78.00 -37.00
Amusement Park 46 276.00 237.50 78.00 -39.50
Apple River 14 84.00 62.70 64.00 - 45.00
TOTAL: 233 910.50 647.70 524.00 -266.50
SPECIAL EVENTS Each week the leaders planned a special event or gave the week
a theme and planned around the theme (Drama Week, Water Week, International Week,
Mystery Week and Olympic Week) The special event that is a popular hit every summer
is the Water Slide held a Valentine Hills School.t ti e i oo
STAFF MEETINGS Every Tuesday noon, the staff met at the Village Hall to plan
and prepare for the next week's activities. The time was used to share how things
were going and to encourage one another by giving each other ideas that worked well.
Each team of leaders made a flyer to advertise their program for the following week.
. STAFF PERFORMANCE This year's group of leaders were the best I've worked with
in three years. They were highly motivated, creative, and dependable.
CRAFTS Crafts were the highlight of each day's activities. The leaders and
I greatly appreciated the budget that allowed us to purchase worthwhile supplies
and projects. It definitely contributes to the quality of our program. The
following is a list of supply expenses.
Knox Lumber 10.50
St. Paul Book 15.98
Hauser's 36.57
Steichen's 41.90
S&S Crafts 25.90
Target 28.06
Cub 16.58
Snyder 51.60
Triarco 147.55
TOTAL: 374.64
PERSONAL EVALUATION I thoroughly enjoy my summer job as program coordinator.
It's fun to return each summer and work with John Buckley. I feel very confident
of my performance this summer. Each summer I learn better ways of organizing the
• program. We had quite a few rainy days to contend with, which put a damper on
many of our plans. John Buckley did a super job of hiring top notch leaders for
me to work with this summer. They are responsible for the success of the summer
playground program.
I feel I have stayed well within the budget plan for summer parks, yet
provided the leaders with all the materials theyneeded to make their playground
a hit.
•
1
RRAY KREPS
K CONSTRUCTION COMPANY INC.
Tel: 631-8543 1676 CHATHAM AVE. • ARDEN HILLS. MN 55112
September 6, 1986
Mayor Robert L Woodburn
and Council Members
Arden Hills City Office
1450 W.Highway 96
Arden Hills, MN 55112
Dear Mr. Mayor, dear Council Members:
This letter is overdue by about one year, however, the sentiments
are just as strong today as they were earlier.
We would like to thank all of you for working so hard to make
Arden Hills the beautiful community it is. Where else can one
• enjoy nature in all its splendor, its sweet smells and special
sounds and yet be only 15 minutes from downtown. Thank you for
the walking paths and upkeep and the lovely benches placed so ap-
propriately in just the right scenic spots. You don't know how
such Ray and I enjoy our daily walks through this beautiful area.
Just like being in the North country (except no bears) . We came
face to face with 4 deer last Sunday. It is hard to believe all
this is ours to enjoy - free -.
You are doing an excellent job keeping things up for us Arden-
Hillians. Ray being from Northern Minnesota shares my enthusiasm.
One of his highlights is to do some mowing of a couple of the paths
himself to keep it looking great.
We just had to tell you how much we appreciate your efforts and
how happy and proud we are to be residents in this outstanding
community.
Sincerely,
Ray and Ruth Kreps
Parks and Recreation Department
History of Park Maintenance Schedules
• Park being maintained in 1980
Sampson Park, Hazelnut Park, Freeway, Ingerson, Perry and Valentine
Some maintenance of Arden trail and Chatham Addition trails.
Additional Park maintenance required in 1986
Floral Park (5 acres), Arden Manor (3), Arden Oaks (3), Cummings (8),
Crepeau Nature Preserve (2) -- approximately 25 acres.
Boulevard maintenance on Lexington Avenue and County Road E.
Trail maintenance -- monthly mowing of Arden trail, Chatham trail,
Cummings trail, Cummings/Floral trail, Norma Avenue trail.
Additional park maintenance that will be required in 1987
North Snelling Park (3.5 acres)
Round Lake Park (3.5 acres)
Additional trail maintenance, Townhouses trail, Colleen Ave. trail.
•
PARK FUND PROJECTIONS
Park Fund Balance, August 31, 1986 288, 182
Future Park Dedication Estimates, December 1985
--------------------------Acre- ------
Acres--Value/Acre
re
Residential Land 90. 1 10,000 901,000
10% Dedi. 90, 100
5% Dedi. 45, 050
2. 5% Dedi. 22,525
, lCommerc i a 1 Land 10. 3 60,000 618,000
10% 61,800
5% 30,900
2.5% 15,450
Industrial Land 99. 1 30,000 2,973,000
10% 297,300
5% 148,650
2.5% 74,325
Potential Park Dedication Income
------------------------------------
Assuming 10% 449,200
5% 224,600
2.5% 112,300
•
GUIDELINES FOR PARK DEVELOPMENT
Proposed Future Park Development Cost
---------------------------------------------
1986 65, 650
1987 84, 850
1988-90 161, 600
1990-95 86, 000
398, 300
200, 000 Proposed Arsenal Athletic Complex
250,000 Revitalized Established Park Sites and Trails
848,300
621 SCHOOL DISTRICT SCHOOL FACILITIES CLOSED SINCE 1980
Active Recreational Facilities Lost to the Community
------------------------------------------------------
Johanna Elementary 1 gym 2 softball fields 1 football/soccer
Ralph Reeder 1 gym 2 softball fields 1 football/soccer
Johanna Junior High 2 gyms 2 softball fields 2 baseball fields
1 swimming pool 3 football/soccer
1 track 4 tennis
Since 1980, District 621 has cut back the following programs:
All elementary athletic programs (Track, Volleyball, Basketball)
All Junior High Athletic Programs (Football, Basketball, Baseball
Swimming, Track, Wrestling
Increased Demand for Facilities and Programs
---------------------------------------------
During the past five years, Arden Hills has experienced
an increase in home building. Most of these homes are occupied by
families with children and are using the programs extensively.
In addition to the new homes, the homes in the older neighborhoods
are beginning to turn over and families with children are moving in.
These families are also using facilities and programs.
•
•
CITY OF ARDEN HILLS' PARK SYSTEM
• Estimated Total Acreage Park Land
162
Active 65
Passive
97
Additional Passive Acres in Arden Hills
Tony Schmidt Park 191
Round Lake Nature Preserve 125
Lake Johanna 200
Little Lake Johanna i6
Josephine Lake 118
Valentine Lake 59
Karth Lake 15
Cty. Rd. E2 Pond 3
-----729
Passive Areas within 10 minutes of Arden Hills
Long Lake Regional Park 200
Grass Lake Regional Park 195
Arden Hills Parks and Recreation Department
• Industrial/Commercial Participation in Leagues
Softball Teams Using Arden Hills' Facilities
Control Data Corporation 27 teams
MSI 7 teams
Land O'Lakes 9 teams
Cardiac Pacemakers 3 teams
Zycad 3 teams
RTI 2 teams
Scholls 3 teams
Honeywell 5 teams
Eastside Beverage 1 team
Northern Spring 1 team
R. L. Gould 1 team
St. Paul Metalcraft 1 team
Commercial 9 teams
TOTAL 72 teams
Soccer Teams 4 teams
Broomball 4 teams
. Tennis Courts
The tennis courts at Cummings and Floral are used extensively by Control
Data, Deluxe Check and Land O'Lakes employees.
Crepeau Nature Preserve
Crepeau nature trails are used extensively by MSI employees and
individuals working in offices in "downtown" Arden Hills during lunch time
and office work hours.
•
LAKE REGION HOCKEY STATISTICS
• 1986-87 SEASON
ANTICIPATED REGISTRATION FOR THIS SEASON
TEAMS IN-HOUSE TRAVELING
REG. FEE 15.00 ATOMS (5-6 YEAR OLDS) 4 - 6 --
20.00 MITES (7-8 YEAR OLDS) 16 --
51.00 SQUIRTS (9-10 YEAR OLDS) 9 3
59.00 PEE WEES (11-12 YEAR OLDS) 8 5
73.00 BANTAMS (13-14 YEAR OLDS) 4 6
100.00 MIDGETS (15-17 YEAR OLDS) - 4
TOTAL 43 18
NUMBER OF PLAYERS
IN-HOUSE TRAVELING
ATOMS 75-100 -
MITES 240 --
SQUIRTS 135 51
PEE WEES 120 85
BANTAMS 60 102
MIDGETS - 68
EST. 655 PLAYERS 306 PLAYERS
COST TO EQUIP EACH TEAM (ESTIMATE)
ATOMS 6 TEAMS X 357 = 2, 142
MITES 16 TEAMS X 438 = 7,008
SQUIRTS 12 TEAMS X 866 = 10,392
PEE WEES 13 TEAMS X 975 = 12,675
BANTAMS 10 TEAMS X 1,169 = 11,690
MIDGETS 4 TEAMS X 1,419 - 5,676
$49,5R3
•
z � rozro I l7i C') M r races zm z -+ "r=ic� MCxa �3
HzW W9t2iO9d c z ro � Syr Hm 0-3�i to C ccnC o a Hmwm � < w
t9" t' pt: H O H Ennv) r rt zo x z z 9 ttri H 0wxyes HH
r r r w z Crl Iv "0 rt ro G) Cl. r H M H 9 0 � "e O H qD m m H z C-2 r C) a
En
9 C Y gi H ro r r
• .e ..
C C w cn x w
t2i r�
cn
P.— N N N N "� N "-' "-' t-• a-• �-' r r N N
f. In V In O ► CN Cr O A 41 lr In V 4 In O% r N CN ON In 00 In
O In O
O O N O O O O O O O In O O O In O O O O O O ti7
O O O O O In O O O O O O O O O O O O O O O O O O z
O O O
t 1 H
+ + +
In In In N O En
O O O O O
O O O 0 O
1
N
A
O
O
w to O _
N N N 9 9 z %D
I.- W W IJ W "-• I-- I--. z I.- C7 00
OD In In In In In 1 In In In O O In W V+ O, W In In In O In O to ON
I
O 0 O O O In 0 I O 0 O "ii O O O O O O 0 0 0 0 0 0 C ro
0 0 o O 0 0 0 1 0 0 0 � O O O 0 00 000000 o
I (nn cn
uNi C7 O
• a Hftl
C vi 0 C
a
O
7C H
v CJ]
0
z
Cd W m
a a E
�. 41 4- A 00 "-• r-• r z r "� r �--• r "� N N w
I n O O O In W W O A O� W W OD 1 V rn Ir O I O ;7
O O O CDI p i O In O T1 O O O In O I In O O O 1 0 5
O O O O 1 I 1 O O O m O O O O O I O O O O I O x
~ 1 w O 1 Z
O N
O In U r N
O '4 O
O cn O
N
r- N N N N `._. N I.— I.—
O In N N O p
In In I I I I O
O 0 O to 0 1 O O O O O O O O I 1 O 1 0 0 0 o w
O O 00 00 O O p 1 O O O O O O O O 1 I 0 1 0 0 0 0 C
I � A E
cn 7D O
x "i
In
9 v
a.i
MEMO
• TO: GARY PECK
FROM: JOHN T. BUCKLEY
SUBJECT: ADULT SOFTBALL PROGRAM - INCOME & EXPENSE
INCOME
MEN'S B REC. LEAGUE 12 TEAMS $3,315
MEN'S C REC. LEAGUE 16 TEAMS 4,400
MEN'S INDUSTRIAL LEAGUE 16 TEAMS 4,595
CO-REC. 14" LEAGUE 12 TEAMS 3, 145
WOMEN'S REC. LEAGUE 16 TEAMS 4,635
$20,090
MRPA STATE TOURNAMENT FEES FOR EXTRA TEAMS 250
FALL LEAGUE 8 TEAMS 1,680
$22,020
C.D.C. INDUSTRIAL LEAGUE 925
j22,945
EXPENSES
• SOFTBALLS $2,160
UMPIRES (14.75 PER GAME) 8,260
TROPHIES 636
MRPA TEAM REGISTRATION 936
MRPA REGIONAL & STATE TOURNAMENT FEES 1,600
PERRY PARK SHELTER SUPERVISOR 300
FIELD MAINTENANCE
LINING CHALK $252 INFIELD MATERIAL 1,040 1,292
POSTAGE 150
OFFICE SUPPLIES 75
FIELD MAINTENANCE & GAME PREPARATION 1,280
ADMINISTRATION COST
SECRETARY 150
BUCKLEY'S TIME 1/2 DAY PER WEEK MAY, JUNE JULY, AUGUST 960
$17,799
NET $ 5,146
Arden Hills Parks and Recreation Department
• Truck Data
1. 79 Chevrolet, 1/2 Ton
Condition - fair
Mileage - 71,000
Used for Park maintenance crew transportation, pulling transport
trailers.
2. 80 Ford, 1 Ton
Condition - fair to good
Mileage - 47,271
Used for Park crew transportation, pulling transport trailers, rink
snow removal, street snow removal.
3. 85 GMC, 3/4 Ton
Condition - good
Mileage - 16,408
Used for Park crew transportation, pulling transport trailers, rink
snow removal.
4. 86 Ford, 1/2 Ton
Condition - excellent
Mileage - 15,178
Used for Park crew transportation, pulling transport trailers.
• During the seasons without snow, one truck is normally used for athletic
field maintenance, one for tree inspection, one in park maintenance, and
one in park construction. The Parks director drives a 75 Maverick.