HomeMy WebLinkAbout07-29-1986 PTRC Meeting Minutes • Minutes of Regular Parks and Recreation Committee Meeting
Village of Arden Hills
July 29, 1986
Village Hall
Call to Order
The meeting was called to order at 7:40 p.m. by Chairman Sand.
Roll Call
Present: David Sand, Adele Anderson, Don Messerly, Alan Montgomery, Tom
Mulcahy, Jim Otto, Mark Peterson
Absent: Gerald Dreyling, Keith Enrooth, Mary Gillies, Jim Mishek
Also Present: Councilman Tom Sather, Parks Director J. T. Buckley
Planner Orlyn Miller
Finance Committee Liaisons Trudy Rautio, Chuck Mertensotto
Approval of Minutes
It was moved by Mulcahy, seconded by Anderson, that the minutes of May 20 be
approved as submitted. Motion carried unanimously.
Cummings Park Hockey Rink, Lighting, and Shelter
Planner Miller presented construction plans and cost estimates for the park
shelter (warming house) previously planned for Cummings Park. (At May meeting
of this committee, Miller had been asked to prepare plans for a garage-type
structure with attractive roof design, large overhangs, and having the front
side extended to create a porch effect - no plumbing).
• Preliminary estimates of the costs of a contractor constructed (stick-built)
versus prefab building revealed that the cost of a contractor constructed
building would be considerably less. Miller is proposing a 20 x 20 foot
building, with a 10 foot overhang in front. The building will have a hip roof
and asphalt shingles. Committee discussed having a shake shingle roof, but
decided against it because shake shingles are (1) more vulnerable to vandalism,
and (2) more flammable. Committee recommends redwood siding. Plans include a
plywood ceiling inside and outside (under overhang). One steel pedestrian door
and one 6 foot wide overhead equipment door are provided. Committee recommends
the equipment door be 8 feet wide. Rationale for this request is that the cost
of an 8 foot door is about the same as a 6 foot door, and the interior will be
more usable for storage purposes with an 8 foot door. Building will be
constructed on a concrete slab.
The quotation does not include cost of electrical wiring. It was Miller's
opinion that wiring could probably be done most economically by the firm
installing the hockey lights. Committee concurred to ask Buckley to get a
quotation for this cost. Committee recommended heating with electric heaters.
Committee further recommends that insulation and interior paneling be added to
the building plans.
Since cost is not expected to exceed $15,000, Committee would like quotations
from several contractors for the building. It would probably take about three
days to prepare the concrete slab; construction time is estimated at three days
• to a week.
Motion was made by Peterson, seconded by Otto, that the following construction
plans for Cummings Park be recommended to Council for approval:
Minutes of Regular Parks and Recreation Committee Meeting
Page 2
1. Park Shelter (cost not to exceed $15,000) (Plan 1, Miller Report)
a. Foundation slab
b. 20' x 20' building - 10' open bay (roof overhang) in front
c. Hip roof, with 2' overhang (roof size 24' x 32' )
d. Asphalt shingles
e. Redwood siding
f. Plywood ceiling inside and outside (under overhang) to prevent injuries
to skaters inside, and birds nesting outside.
g. One steel pedestrian door, and 8 foot overhead equipment door
h. Interior insulation (fiberglass bat) and paneling (if affordable given
$15,000 limit on expenditure).
2. Lighting of hockey rink and general skating area per Musco proposal (April
30, 1986, at cost not to exceed $8,500. Wiring of shelter by same
contractor, Buckley to negotiate with Musco Lighting for this, at cost not
to exceed $3,000 (total not to exceed $11,500).
3. Construction of hockey rink and general skating area, at cost not to exceed
$15,000. Labor to be provided by Parks maintenance personnel. Boards to
be removed at end of skating season.
Motion carried unanimously.
• North Snelling Park
Miller reported that grading of the playing field area has been completed. The
North Heights Lutheran Church contractor has deposited some top soil in the
area of the pond; it will be his responsibility to grade this area evenly to
the edge of the pond and eliminate the drainage ditch which runs on park
property. Miller and Buckley will monitor to ensure this is done.
When grading is completed, the area will be seeded by Parks personnel (probably
in late August).
Proposed 1987 Budget
Summer Playground Program
No increases or changes are planned in this budget for 1987.
Rautio asked Committee input re fees for this program, since Finance
Committee last year had discussed raising fees and including t-shirts.
They are now $5.00 per participant. It was determined that Arden Hills'
fees at this time are comparable with neighboring communities; committee
recommends no change in fees, and not including t-shirts.
Skating Rinks
1986 expenditures are anticipated to be about $1,000 over budget, mostly in
Acct. 104 (rink attendants). Last winter's weather was such that the
skating season extended one week longer than normal, and there were fewer
days when rinks were closed.
• The 1987 Budget is increased by approximately $5,000. Two additional rinks
will need to be maintained, and an attendant provided for the new Cummings
Minutes of Regular Parks and Recreation Committee Meeting
Page 3
Park rink.
Shade Tree Disease Control
This budget for 1987 is increased by approximately $750 for reforestation.
Buckley stated that Arden Hills has done an outstanding job in its diseased
tree program, and the time has come to replant some of the trees lost to
disease.
Self Sustaining Recreation
Revenues are equalling expenditures in this area. The 1986 expenditures
are expected to be $45,500; budgeted amount is $37,735. This overage
occurred because the cities assumed responsibility for the previously
school managed Spring Track Program. Income was $5,496.00, expenditures
$4,597.14 (income from program - $948.86).
The 1987 budget assumes Arden Hills' continuing to sponsor this program,
and adding a volleyball program previously sponsored by the schools. A
fall softball program is also being added.
Park Fund
Motion was made by Sand, seconded by Montgomery, that because of the rapid
depletion of the Park Fund, the lower amounts being received in recent
negotiations for park dedication,• and-: the -lack of future available land for development which is subject to park dedication fees, this committee
recommend to Council that park salaries not be allocated to the Park Fund.
Motion carried unanimously.
The balance in the Park Fund is currently $296,737. Anticipated future
revenue is $115,000. This clearly shows that the fund will be depleted in
the not-far-distant future.
Committee concurred with Buckley's proposed 1987 capital improvements
($55,700).
Park Maintenance Budget
This budget increases. Line items increased are Acct. 212 (Gas and Oil).
This is a two-fill year for the bulk tank (18 month intervals).
Acct. 550, Automotive Equipment, calls for expenditures of $23,500. These
equipment expenditures were called for in the five year plan. The Case
tractor will be replaced (cost shared with Public Works) ($10,000); the
1979 1/2 ton is scheduled to be replaced with a 3/4 ton truck; the very old
flooding truck will be replaced with Public Works' truck, new tank added.
Replacement of a 1980 1-ton truck is also scheduled.
Acct. 109, Park Salaries, increases. Buckley is requesting full time
employees be increased from two to three. During all of 1986, Kevin Fuller
has worked continuously as a temporary, seasonal employee; this was
• necessitated by the heavy work load. This budget proposes that he become a
regular employee, at a total increased cost of $10,400.00, increasing
salary to that comparable to the other two full time employees.
Minutes of Regular Parks and Recreation Committee Meeting
Page 4
Committee discussed amount budgeted in Acct. 207, Travel, Conference and
Schools. Committee recommends this be increased to $500 to allow more
training time for employees.
Motion was made by Otto, seconded by Montgomery, that the 1987 budget, as
proposed by Buckley and amended by this committee, be recommended to Finance
Committee and Council for approval. Motion carried unanimously.
Fall Program Proposal
1987 Fall Program is identical to 1986's, with one addition. Buckley proposes
beginning an experimental after school program at Valentine Hills School.
Recent studies at the University indicate over 50% of elementary age youngsters
are unattended from the close of school until their parents return from work.
At this time plans for the program have not been made; it is expected to be
totally self-sustaining, that fees will equal costs. It will probably begin
with a one to two day a week program to assess interest in such a service.
Committee unanimously encouraged the formation of such a program and agreed to
assist in any way.
It was moved by Otto, seconded by Montgomery, that the 1987 Fall Program
Proposal be recommended to Council for approval. Motion carried unanimously.
Flower Garden - Yard Beautification Awards
A subcommittee of Messerly, Mulcahy and Montgomery will meet Monday, August 4,
to tour Arden Hills and then submit recommendations for recipients of these
awards in 1986.
Miscellaneous/New Business
Committee members relayed to Buckley their observations of the fine quality of
work and of how hard the Park maintenance personnel worked. Also mentioned was
the high quality of the playground leadership, especially noted at Cummings and
at Hazelnut parks.
Council Report
Sather reported on Council actions of interest to this committee. Committee
expressed its disappointment in elimination of the sidewalk on the east side of
Hamline Avenue; asked if it could be included at a later date.
Sather stated his observation that the Engineer did not lend credence to Park
committee recommendations regarding Hamline Avenue improvement.
Adjournment
The meeting was adjourned at 10:45 p.m.
•
CUMMINGS PARK SHELTER
SPECIFICATIONS
Based upon discussion at the May meeting of the Parks and Recreation
Committee and conversation with John Buckley, a park building with the
following specifications was investigated:
20' X 20' building
10' open bay (roof overhang) in front
Hip roof (trusses) with 2' overhang (roof size 24' X 32' )
Asphalt shingles
Textured plywood siding
Plywood ceiling inside and outside (under overhang)
One steel pedestrian door
One 6' -wide overhead equipment door
Concrete slab base
Options
Cedar shake shingles
Redwood beveled lap-siding
• PRELIMINARY COST ESTIMATES
1. CONTRACTOR CONSTRUCTED ("stick-built")
a. Foundation slab (including base and excavation) $ 1,800.00
b. Materials 4,500.00
c. Labor (including profit and overhead) 6,500.00
TOTAL 12,800.00
d. Shake shingle roof 750.00
e. Redwood siding 800.00
2. CEDAR FOREST PRODUCTS PREFAB
a. Foundation slab $ 1,800.00
b. Materials (delivered) 11,600.00
c. Assembly 7,000.00
TOTAL $20,400.00
d. Shake shingle roof 850.00
3. AMERICAN LEISURE DESIGNS PREFAB*
a. Foundation slab $ 1,800.00
b. Materials (delivered) 11,000.00
c. Assembly 5,000.00
TOTAL 17,800.00
d. Shake shingle roof 800.00
*Preliminary quote. Subject to adjustment.
•
_ � z
I I
I I
i
i =IL
- _ -
Q
p � �
� z
i
w w
ii IL J
w w
w
ii II
CO
I
cc
I,! fLL
- ---------------
Sports Technology/P.O. Box 27231 I Golden Valley, MN 5542718001622-7041 /612/533.2030
musco.
LIGHTING, INC.
April 30, 1986
John Buckley
Park and Recreation Director
City of Arden Hills
1450 W. Highway 96
Arden Hills, Minn. 55112
Dear John,
The following information is provided to light the Cummings Park
Hockey Rink. We propose to light the rink using a two pole system
and provide 15 f ootcandles of lighting. This will provide correct
lighting for youth hockey.
Installation includes the following. . . . . . . . . . . . . . . . . . . .$8,500.00
1. Provide 60 foot full length treated fir poles.
2. Auger holes for poles. ?�
• 3. Mount lighting on poles,
4. Set poles and backfill with rock * � .
5, Aim lighting
6. Provide and install all electrical materials.
7. Two year warranty on parts and labor.
8. Five year warranty on aiming alignment.
*The design criteria is based on soil conditions with 200PSF
or greater lateral load.
Craig Gallop
•
L/ght years ahead..,through technology
Capital Improvements, 1587 - Parks
Hazelnut Grading Front Area 5, 000
Table, Grill 450
5, 450
Arden Oaks Picnic Grill 400
400
CrepeaLk Flowers 1, 500
1, 5C>0
Perry Volleyball 600
Regrading Lower Field 15, 000
15, 600
Floral Play Equipment 8, 000
Picnic Shelter 3, 500
11, 500
Cummings Lake Path 4, 000
Picnic Grill, Tables 1, 000
Landscaping 500
5, 500
North Snelling Play Equipment 8, 000
Back Stop 1, 000
Benches 750
9, 750
Trails Landscaping and Surfacing 5, 000
5, 0 r(-)
Park. Planning 1, 000
1, 000
TOTAL 55, 700
ARDEN HILLS PARKS & RECREATION DEPARTMENT
1985 Fall Program 1986 Fall Program Proposal
YOUTH YOUTH
Gun Safety Gun Safety
Preschool Halloween Party Preschool Halloween Party
Baby Sitting Instruction Baby Sitting- Instruction
Elementary Gymnastics Elementary Gymnastics
Preschool Preschool
Elementary Age Elementary Age
Floor Hockey Floor Hockey
Flag Football (Shoreview) Flag Football (Shoreview
Tap, Ballet, Jazz Dancing Tap, Ballet, Jazz Dancing
After School Programs*
ADULTS ADULTS
Jazzercise Jazzercise
Men's Open Volleyball Men's Open Volleyball
Three Man Basketball Three Man Basketball
Seniors' Club Seniors' Club
Broomball Broomball
Volleyball Leagues Volleyball Leagues
Jackie Sorenson's Exercise Jackie Sorenson's Exercise
OTHER OTHER
Lake Region Hockey Lake Region Hockey
Wrestling Wrestling
Aquatic Program Aquatic Program
Winter Fair Equipment Swap Winter Fair Equipment Swap
Mustang Basketball Mustang Basketball
*New Program