HomeMy WebLinkAbout09-25-2001 PTRC Agenda Packet ,,-A EN HILLS
AGENDA
PARKS, TRAILS, & RECREATION COMMITTEE
TUESDAY, SEPTEMBER 25, 2001
** 7:00 P.M. **
ARDEN HILLS CITY HALL
4364 WEST ROUND LAKE ROAD
1. Call to Order and Roll Call
2. Approve August 28, 2001 Minutes
3. Parks and Recreation Updates
4. Park Comprehensive Plan Discussion
5. Council Update
6. Buck Thorn Removal Program Update
7. Next Meeting Agenda
8. Other Items for Discussion
9. Adjourn
** Please call Tom: (651) 634-5133 or Jim: (651) 628-9406 if you
are unable to attend this meeting**
•
-,,-A EN HILLS
MEMORANDUM
TO: Members of the PTRC
FROM: Tom Moore, Parks & Recreation Director
SUBJECT: Buckthorn Removal Project at Crepeau Park
DATE: September 18, 2001
The Buckthorn removal project at Crepeau Park will take place on
SATURDAY
September 29, 2001
9:00 am - 2:00 pm
Meet at the bench swing
THORNS ARE SHARP!
Wear jeans, heavy long sleeve shirt, leather gloves, and glasses or safety glasses
Wear old clothing as you may end up cutting jackets/shirts with thorns
•
Arden Hills Park, Trail and Open Space Plan—Competition Schedule
Commission Tasks/Actions
meeting date
August 28th Review summary of community input, individual park renovation
recommendations, draft plan outline and revised schedule. Divide into
trail area teams and begin detailed trail planning process.
Sept. Committee trail teams to prepare trail recommendations for their area.
Recommendations due by Sept. 291.
Sept.4e V7 Review draft CIP prioritization, draft plan sections, and review trail
recommendations from Trail Area Teams. Set community open house
meeting dates (2).
Oct. 23rd Review Draft Park, Trail and Open Space Plan.
Oct. 30/Nov. 1 Community Open House Meetings (2) to Review Draft Plan
or Nov. 14-15
Nov 27th Review final draft of Park, trail and Open Space Plan
December Public hearing and joint PTRC meeting with City Council
•
9. a.,Ct o �
t
lot
•
4
i
MINUTES
PARKS, TRAILS & RECREATION COMMITTEE
TUESDAY, AUGUST 28, 2001, 7:00 P.M.
ARDEN HILLS CITY HALL
4634 W. ROUND LAKE ROAD
CALL TO ORDER
Chair Johnson called the August 28, 2001 meeting of the Parks, Trails and Recreation
Committee to order at 7:08 p.m.
MEMBERS PRESENT
Members present were Jim Johnson, Rich Straumann,Patrick Krenn, Tom Moore, Roberta
Thompson, Steve Zilmer, Council Liaison Gregg Larson, Michelle Olson, Staff, Steve
Wensman, Ingram and Associates, and Bonita Sullivan,Recording Secretary.
MEMBERS ABSENT
Members absent were Don Tix, Jennie Michaels, Jim Crassweller, Don Messerly, and Louis
Speggen.
APPROVAL OF AGENDA
The Agenda was approved by consensus.
APPROVAL OF MINUTES
Chair Johnson asked for any corrections to the minutes. He stated that no changes were
received.
MOTION: Committee Member Straumann moved and Committee Member Krenn
seconded the motion to approve the July 24, 2001 minutes as presented. The
motion carried unanimously.
PARK AND RECREATION UPDATES
Mr. Moore provided a Park and Recreation update to the Committee. He referred to the
package of information provided for review and referenced the news articles in the St. Paul
newspaper regarding the Buckthorn problem. He stated that he spoke with Phil Fabel
regarding a potential Boy Scout/Eagle Scout park project, which will be done in October
2001 adding that a date is yet to be determined. He referenced Northwestern College and the
Protected Parks permit application from the DNR regarding work that is to be done along
Lake Johanna that involves removing the existing footbridge and abutments and replace with
a new bridge on the campus. He reviewed the Park employee time and workload breakdown
ARDEN HILLS PARKS TRAILS & RECREATION COMMITTEE 8/28/O1 2
sheets adding that they are in the process of evaluating and breaking down the hours by pay
period. He explained that this will provide them with an analysis of where time is being
spent and provide the employees with a tool that will help them become more aware of the
need for accuracy in payroll coding. He announced that Ramsey County is offering a
backyard compost bin and anyone who would like to participate can pick up a registration
packet available at City Hall. He stated that it would be announced in the City newsletter
adding that the event will take place at the City Hall in Arden Hills, on Saturday, October 6,
2001.
Mr. Moore provided an update for the City stating that they have installed new playground
signage at Freeway, Floral and Valentine Parks. He reviewed the appearance of the signs
with the Committee and explained that all of the parks now have signage except for Lindy's
Triangle and Arden Manor and that the signage for these parks is something that needs to be
considered. Mr. Moore reviewed the locations for the new signage at Kraypo's Nature
Reserve, adding that they now have adequate signage. He stated that they have completed
the fall aeration and announced that the fall fertilization begins next week. He stated that
they have started the soccer season with a new soccer field at Valentine Park adding that this
is the third seasonal park in two years. He stated they have completed two Boy Scout\Eagle
Scout projects. He explained that Jeff Jensen put in 200+perennial beds at Floral Park and
reviewed the types of plants and flowers that were planted. He stated that next year they
would be placing wood chips along the trails, bench areas and play structures. He stated that
Pat Berger completed and placed eight new park benches near the play areas and reviewed
the locations with the Committee. He stated that there was some vandalism in the parks and
the vandals stole the playground signs for Engerson and Arden Oaks playground. He
explained that they purchased new locks for the parks and explained the installation to the
Committee. Mr. Moore noted that they experienced vandalism at the warming house adding
that they had a successful conclusion in that the Park Attendant contacted the Ramsey
County Sheriff who in turn, detained five young men ranging in age from 5-years to 10-years
in age. He explained that they were in the process of spray painting in the park when they
were caught. He stated that they caught the boys before any damage occurred.
Chair Johnson asked for clarification on the permit request for the new bridge at
Northwestern College. Mr. Moore reviewed the permit request, the planned work, and the
location of the bridge with the Committee.
Council Liaison Larson stated that he couldn't understand why they needed a 52-foot long
bridge. Chair Johnson explained that they are probably dealing with access issues.
Mr. Moore stated that he would monitor this project adding that the DNR has explained that
it is very difficult to acquire this type of permit. He further explained that the DNR does
monitor the work site progress and evaluates the impact to the environment as it is in
progress and that this enables the DNR to intervene if they discover any issues during a
project.
Chair Johnson clarified that the bridge work has nothing to do with the City. Mr. Moore
confirmed that it did not have anything to do with the City that the information provided is
ARDEN HILLS PARKS, TRAILS & RECREATION COMMITTEE 8/28/01 3
just a part of the update and was provided to the Committee as an FYI.
Committee Member Thompson commented that the old bridge has been down for a couple of
years.
Council Liaison Larson shared a short story with the Committee about the bridge.
Ms. Olson provided an update for the park sports enrollment to the Committee, noting they
had a good summer as far as enrollment is concerned. She stated that they had several parks
with tight schedules noting that the afternoon Kids Club had the strongest increase in
numbers for attendance which is a good sign that they enjoyed the program. She referenced
and reviewed the packet of information provided to the Committee and explained they are
trying to improve the process by trimming the classes that have had low attendance or no
interest. This is being done as an effort to maintain the quality of the classes offered.
Ms. Olson announced that they recently completed the fall soccer registration. She stated
that they have twenty teams this year in comparison to nineteen teams last year adding that it
is good to see such a great turnout for registration. She noted that they have plenty of
coaches this year, the soccer practice began this week, and so far it is going well. She stated
that the addition of the new soccer fields has helped tremendously with respect to scheduling
fields for practice and games. She stated that fall softball has ten men's' teams and that they
are now using all of the fields that are available. She noted that she is working to wrap up the
summer programs and has started the process for fall hires. She explained that she utilizes
the University of Minnesota job line and that they have received an unbelievable response to
the job openings. She further explained that she has received 50 to 75 calls regarding
available positions adding that she is presently in the interview process and would be with a
full staff soon as it is a busy time of year.
Chair Johnson asked if any of the activities had low attendance. Ms. Olson referenced the
Skyhawk Camp adding that they have combined with Shoreview. She explained that the
price deters attendance and they would like to consider more options for the camps next year.
She noted that overall, the attendance numbers were fine.
Ms. Olson announced that the new fall guide is out and available.
PARK COMPREHENSIVE PLAN DISCUSSION
A. Arden Hills Park, Trail and Open Space Plan
Steve Wensman, Ingram and Associates, referenced the packet of information provided to the
Committee for review and took the Committee through a review of the graphic schedule for
the rest of the project. He added that there is a more detailed text schedule included in the
packet. He referenced the results from the workshops and reviewed the contents of the
packet provided with the committee. He stated that he has more information to add to the
packet and this is a start for preliminary comments. He asked the Committee how they
would like to receive their update.
ARDEN HILLS PARKS, TRAILS & RECREATION COMMITTEE 8/28/01 4
Chair Johnson stated that he was not able to attend the meetings and asked Mr. Wensman to
review the packet.
Mr. Wensman explained that they had a good turnout for all of the meetings. He reviewed
the comments provided from Ramsey County and explained that there was discussion
regarding the barrier access to various parks adding that the people were very interested in a
bike route around Lake Josephine and how it would be achieved. He stated that feedback
was strong that Lindy's should remain a park and left as unprogrammed, open space. He
reviewed the feedback received from residents with respect to their concerns for the parks in
their areas. He explained that the concerns expressed included maintenance, tree trimming,
installation of park benches, play structures, drainage and flooding issues, parking, biking,
trail connections, signage, programming, additional skating rinks, and roller blade access. He
stated that residents were interested in maintaining paved and unpaved trails in all the parks.
Committee Member Straumann referenced the hockey rink discussion adding that this has
been discussed on several occasions.
Chair Johnson asked what Mr. Wensman will do with the information. Mr. Wensman
explained that he is going to include as much information as possible into a plan that would
include comments and in turn provide the compiled information to the Commission for their
review and feedback. He further explained that some of the information in general, would
4Pcreate a policy.
Chair Johnson clarified the format and asked that if there would be a narrative and graphics
included as needed. Mr. Wensman confirmed that this would be the format provided.
Chair Johnson referenced comments regarding Ramsey County issues and asked if they
would be addressed. Mr. Wensman stated that this has not been discussed yet but that it
would be coming up for discussion with some strategies.
Chair Johnson stated that he hopes the final result will allow them to prioritize issues and
projects.
Mr. Wensman said that he did put together entire park plans for their review and provided an
overview of some of the key issues that affect various parks in the area.
Committee Member Straumann asked if they have a formal area name. Mr. Moore
confirmed there is a location that is dedicated parkland adding that it does not have an official
title.
Mr. Wensman reviewed the proposed layout and access points of the park.
Mr. Moore noted that there is a definite possibility that the City would be able to acquire this
property in the future adding that the owners are open to discussion.
ARDEN HILLS PARKS, TRAILS & RECREATION COMMITTEE 8/28/01 5
Council Liaison Larson clarified that what was provided is samples noting that certain parks
such as Cummings is not included.
Committee Member Straumann referenced Perry and the summertime basketball area.
Ms. Olson asked that the sliding hill near the warming house be removed from the Hazelnut
Park plans.
Chair Johnson clarified the size of the skating rink located near Trinity Lutheran Church and
reviewed the location and potential area noting that it could be increased. Ms. Olson stated
that it is quite a bit smaller than the regulation size.
Mr. Moore stated that a church owns this land and explained that they plan to take the land
eventually for a school for disabled children. He further explained that this is their first
priority adding that their second priority is church population. He noted that they are in
trouble right now but anticipate an increase adding that, if the property is taken, it limits their
ability to expand. He noted that there has been no discussion with Trinity Lutheran Church
and the City with respect to acquiring the property for parking, as they have no interest. He
explained that the City has maintained the area adding that the Church is not interested in a
formal agreement.
Mr. Wensman stated that the information on several of the parks is not complete adding that
it is his plan to do site visits and analysis that will include comments and feedback. He
further stated that he would include suggestions and recommendations on how to address the
issues. He reviewed the sections of the plan and the intended information for each section.
He then reviewed the milestone dates for the project and the trail teams.
Council Liaison Larson expressed concerns regarding the schedule. He noted that the
schedule for review shows a due date of September 24, 2001 for feedback which would
provide one real day for the teams to review 13 parks. Council Liaison Larson asked if the
schedule was a bit ambitious. He suggested that the consultants should work closely with
Ms. Olson and Mr. Moore adding that this would provide the direction the City wants to take.
He stated that the Committee needs more time to review the information.
Mr. Moore said that they would review the schedule and agreed that they should add an
additional Saturday in September for the review. He suggested that the Committee decide on
a date and recommended Saturday, September 29, 2001 as a first choice. He stated that the
meetings are usually held from 9 a.m. to 12 p.m.
Chair Johnson suggested a morning work session. He clarified that the entire process would
be done in January 2002.
The Committee agreed by consensus to schedule a work session on September 29, 2001, 9
a.m. to 12 p.m.
Mr. Wensman asked if they should have everything completed and out for review prior to
ARDEN HILLS PARKS, TRAILS & RECREATION COMMITTEE 8/28/01 6
that time. Mr. Moore stated that the review should be completed and available for review
prior to the September 29, 2001 work session.
Mr. Wensman asked the Committee to review the information provided and forward their
comments to Mr. Moore or Chair Johnson.
Committee Member Straumann asked that Mr. Wensman include the information presented
tonight, along with the minutes, to those who were not in attendance. Mr. Wensman
confirmed that everyone would be provided with an information packet.
COUNCIL UPDATE
Council Liaison Larson provided a City Council update to the Committee. He referenced the
income tax hearing noting that it has been delayed. He explained that a meeting had been
scheduled adding that due to the lateness of action by the State Legislation they were exempt
from holding an income tax hearing. He stated that it has been rescheduled for December
2001. He noted a significant change in the levy this year and stated that they have a$2.8
million budget. He explained that this year legislation removed K through 12 from the tax
support previously received through the property tax. He referenced the homestead and
agricultural credit noting the dollars that will be lost. Council Liaison Larson explained the
levy limits adding that this year they cut HACA funding which allowed them to increase the
levy to makeup the difference. He explained that they expect it to increase 7.5% in City
taxes. He further explained that the property tax bill would actually decrease overall but the
increase would be seen at the City level.
Council Liaison Larson stated that there are open issues with street width, urban gutter, storm
water improvements, localized versus dispersed, adding that they are meeting on September
12, 2001 to allow time to work through the issues. He noted that it is very unlikely that they
would have a pavement improvement project in Arden Hills next year.
He noted a foundation drainage issue at City Hall adding that it appears it was not properly
installed and would need to be replaced in order to keep the basement from flooding. He
further noted that the dedication has been delayed until October 2001.
Council Liaison Larson referenced the `Day in the Park' celebration adding that they
recognize that they cannot do again what they did this year. He explained that the Council,
by consensus, decided to increase next years' budget from $5,500.00 to $9,700.00 for the
`Day in the Park' celebration adding that there has been discussion regarding the location of
the celebration.
Council Liaison Larson stated that Presbyterian Homes has come forward to ask for bonding
and this is their second time coming to the Council. He explained the lower revenue bonds
and they have asked for$5.5 million in funding. He stated that they do not have the funding
and a Public Hearing has been scheduled. He stated that they are working on the Stormwater
Management Plan which is a part of the City's Comprehensive Plan. He explained that the
work is being done by consultants and the first work session was held last week.
r
ARDEN HILLS PARKS, TRAILS & RECREATION COMMITTEE 8/28/01 7
TRAIL TEAM SCHEDULES
Mr. Moore reviewed the Trail Team Schedule and stated he divided the Committee into
teams based on the four sections of the City noted in the Park Comprehensive Plan Map. He
reviewed the team members and explained the process they used to determine the teams. He
further explained that the teams are responsible for all formal and informal trails in their
quadrant for the review process.
Chair Johnson asked Mr. Wensman to clarify the maps provided to each team. Mr. Wensman
provided maps to each of the teams and reviewed the legend and content with the Committee.
Mr. Moore reviewed the trail review process with each of the teams and the items that would
require observation and comments within each analysis. He stated that they could do the
evaluation of the trail system as a team or individually,noting that either way they would
receive opinions as a team and individually with respect to needs and condition. He
explained that they have one month to complete the review and turn in the results for the next
PTREC meeting.
NEXT MEETING AGENDA
• Discuss Trail Results
• Park Comprehensive Plan Update
• Buckthorn Issue
Council Liaison Larson asked if they were going to attend any of the meetings to discuss the
Buckthorn issue. Mr. Moore reviewed the process they plan to take noting that it would
probably be brought to the Council in late October 2001.
OTHER ITEMS FOR DISCUSSION
None.
ADJOURNMENT
MOTION: Chair Johnson moved and Committee Member Krenn seconded the motion to
adjourn at 8:25 p.m. The motion carried unanimously.
Respectfully submitted,
Bonita Sullivan
Timesaver Off Site Secretarial, Inc.
z
O
z
IM
` c
—i' L'
CD �
ram ; _ Z3
C= ". CD
a- (D COD
cD `Tj
►--�
_ cn
O �I
v
8R18w2fk5
sew Arden Mannor Park City of Arden Hills 1510G—�
s and "�'B°P°�'�°7-10'"
EN HILLS 8124/01 Proposed Improvements Park d Recreation o e12n77-2500 ran-iow
MOORE,
I N G R A H A M
A S S 0 1 A 7 E S
0 1>"
1 !
�/'��•' f. -�- 1, _ _ f,
f =
�.r
�i
F e
r
{` r
\
!
r
,i
22
31
00
Qz oo - —
-- DEN HILLS _
s � \
m l 3 3 a�
3
g -
� ncr
IF
n
3� 3
r,
-
�R T)FN HILLS
v
I
N 0 C _
v 3. CD -
iv = o -o
.
CD - CDco �
U) co 0 = 5
N CD
PK-
� oy
G:-
f
_ N 1 •w
e
W
co
4 _
t
'D
O
Q
(D
N
UXUD
(Q�
'-
--A HILLS
!
i
i
;
I
,
!
I { -'`°
1
, u
Oo
(D -1.7 j
_p,
�c-
cl)
.. �p
r �
! � N ----------------
1 � N Jyj
i
w
S—
t i
/ � a
r f
1 I
4-1
L-
i
NAMLINE A\ENUF
s ? c
--A-R E HILLS = - -
� i i
z
Ole
CID
DO
o 0
� (D
o = � M o
77
0 n (0 Z.
CCID
-
4;,
CD x `
CD
n
Q QC
-. } c
r - ,�
M -0
ROA < CID
3 < O 7c
90
Q r
CD �+ CD � �a C L
CZ 3 - Q
GJ 0
<
(n CD 0— CD Cn
CD CD
C
< CD
CD : =3
3 O M
CIDc =3 t�
\ � s
O
V
1
r
'Pew Freeway Park City of Arden Hills
S��Iv 1510 Camp A—Sodwwl
Proposed Improvements Parks and Recreation W.,Wds'�^ b%410
EN HILLS s�zaro� t3'7�00 r 0
z
ON)
e—;
� v
`0
1
4 1 TT
V
O
-- CAD
u
M
� J
rn
CD
'WWrks Sampson Park City of Arden Hills ��
sW 1510 Camp Awnie Southeast
Proposed Improvements Parks and Recreation K%.� "" 655414
EN HILLS Oro, �77-2 W0f371A0100
z
010
a
CD
C ::3 _
0CD
�
C
CD
7
C m
-4. ._
fl-:_`_
i
J!
�O
0
�3 N
O
wdwpaft
O
Shehey Park City of Arden Hills MMEREW!110
sm 1510 Como Avenue Soufh m
Proposed Improvements Parks and Recreation ""^^°w"-"0^�°b010
—AjqDEN HILLS arzaro� c elvan-nw can-1
o�o
—ingm a—migs—
e
Title credits page
PTRC
CC
Staff
Consultants
Contact information
For further information about this plan contact:
Arden Hills Parks and Recreation
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 1
t
In general, the existing developed portion of Arden Hills is
well served by parks. There key acquisitions needed to
improve function and safety (parking and driveway changes at
Perry Park) and to assure long-term use (such as access and
parking for Cummings and Hazelnut Parks).
Use of major portions of the TCAAP lands for recreation and
open space is important as TCAAP transitions from the
former munitions plant use to a mixed-use development area.
Dedication of parks, open space and trails in accordance with
the TCAAP Plan will assure an adequate supply of recreation
and open space for new residents and employees and
enhanced recreation opportunities for existing Arden Hills
residents. Park land acquisitions are discussed further on
page_.
4. Fundin
The Park, Trail and Open Space Plan establishes a need for
approximately $ million in park and trail improvements
and acquisition over the next 20 years. A long-term
commitment of funding and personnel is needed to achieve
the plans vision. A combination of annual city capital
improvement funds, Federal and State grants, cooperative
funding of State and County trails, private sector support and
park and trail dedication from new development and
additional set asides of open space land at TCAAP are
needed, along with continued community and political support
for park and recreation. A draft funding plan is attached on
page_.
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 3
Table of Contents -
s
•
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 5
igure A- City Location Ma
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 7
Planning Process Summary -
The City of Arden Hills wanted the Park, Trail and Open
Space Plan to accurately reflect community desires and needs.
A public opinion survey was conducted and a series of public
open house meeting and Park, Trail and Recreation
Commission meetings and workshop sessions were held to
gather input and to prepare the Plan.
Public Opinion Survey: In February 2001 a detailed public
opinion survey was sent to each Arden Hills household.
Approximately 15% of the households completed the survey.
carve results are summarized on page_ and a full copy
The s P g —
Y
of the survey and responses is contained in Appendix A.
Open House Meetings: Four public open house meetings were
held in August 2001 to gather information about city-wide
and neighborhood park, trail and open space needs. The
meetings were held in four different location throughout the
city. A summary of the meeting results is included in
Appendix B. A community open house was held in ,
2001 to review the draft plan and recommendations.
Commission Meetings and Work Sessions: The Arden Hills
Parks Trails and Recreation Commission or PTRC oversaw
preparation of the plan and provided detailed guidance and
input into the process working with the consulting planners,
city staff and the community.
Review of Existing Plans and Coordination with Other
Jurisdictions: A number of existing plans were reviewed to
help prepare this plan. The Arden Hills Comprehensive Plan,
the TCAAP (Twin City Army Ammunition Plant) Plan,
Ramsey County Parks and Trails plans, year 2000 Census
data, adjacent community parks and trail plans, and the Arden
Hills Gateways plan were all helpful resources.
Site Analysis and Staff Input: City staff and the planning
consultants visited each park and many trail corridors to map
and document existing conditions and to plan for future
improvements. City park management, programming,
maintenance, legal and finance staff all participated in the plan
• preparation or review.
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 9
Demographic and Recreational Trends -
Demographics—
The City of Arden Hills is a mature largely developed
community. It's residents, on average are:
• Older than the average Minnesotan and Twin Cities area
residents.
• There are fewer children and more senior citizens.
• There are a higher proportion of"baby boomers".
• There is more owner occupied and less rental housing.
• There is a high proportion of two wage earner households.
• The City is more affluent than most.
Arden Hills Minnesota
Median age (yrs.) 36.2 35.4
Under 18 yrs old 20.0% 26.2%
65 yrs and over 13.9% 12.1%
45-59 yrs old 21.7% 18.1%
Housing Own/Rent 88%/12% 75%/25%
Implications: Over the next 10-20 years a significant
proportion of Arden Hills residents will retire. Some will
move out of the community, some may move to a smaller
home and some will stay in their current home. This probably
means some degree of change in neighborhood and
community demographics. The higher median home values in
Arden Hills may result in a higher proportion of established
families and fewer first time homebuyers. Some new residents
are likely to be younger and have more children than existing
residents. The City should continue to monitor changes and
to work with the school district to track demographic and
student population changes. If the change is significant the
city can restructure recreation programs and may need to re-
evaluate facility supply. Discretionary time is likely to remain
at a premium. Many senior citizens are active park and trail
users.
Recreation Trends—
Recreation interests and participation are influenced by many
factors. Age, access to facilities, amount of leisure time,
interest in the environment, new recreation technology, and
social trends all influence recreation participation. In general
people are looking for quality recreation close to home, but
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 11
Public Input Summary —
Arden Hills Parks, Recreation and Open Space Public
Opinion Survey Summary
Introduction
In February 2001 the City of Arden Hills, Minnesota
conducted a public opinion survey of residents. The survey
was designed to determine resident's attitudes about park,
recreation and open space issues and to help guide
preparation of a park, trail and open space plan for the city.
The written survey was sent to 3,897 households and
businesses in the city. A total of 593 completed surveys were
returned for a response rate of 15%. This is a higher than
normal response rate for a mail-back survey and indicates a
high level of interest in city parks, trails and open spaces.
This high response gives the survey results a relatively high
degree of accuracy. The margin of error of the survey is plus
or minus 4%. A copy of the survey is attached. The
following is a summary of the findings, implications for the
park and trail plan and the results for each question.
Survey Findings
1. Arden Hills residents are passionate about parks, trails and
open space.
2. They are frequent users of the parks and trails.
3. They are satisfied with the existing parks, trails, maintenance
and programs. The overall satisfaction level is 70%to 80%.
4. They want more TRAILS!
5. They also want existing parks to be renovated, passive
parks areas to be improved and more land acquired for
passive parks and natural areas.
6. There is interest in an indoor recreation facility.
7. There is some support for fee increases and tax increases
for park purposes.
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 13
• Goals and Key Issues -
Park, Trail and Open Space Plan Goals:
1. Complete trail connections and expand trail use
opportunities.
2. Revitalize underutilized parks.
3. Advocate for dedication of public lands in TCAAP.
4. Ensure permanent access and parking for major parks
with no access and parking easements.
5. Enhance natural areas and opportunities for passive uses.
6. Secure funding to ensure that the vision is achievable.
7. Enhance partnerships with businesses, institutions and
agencies.
8. Increase visibility and access to parks and trails.
9. Continue to evaluate and respond to changing
demographic and recreation needs.
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 15
the railroad acts a significant barrier between neighborhoods
and park use.
Trail Connections—
Additional trails are needed to provide a comprehensive
network of walk/bike ways and to connect the community
together. These trails will function for recreation and as a
non-motorized transportation alternative.
A. Snelling/Highway 10 corridor from the Arden
Hills/Roseville border to Highway 96.
B. County Road E between Snelling and Hamlin Avenues.
C. County Road E between Lake Johanna Blvd. and
Sampson/Hazelnut trail corridor.
D. Cleveland Avenue south of the Sampson/Hazelnut trail
corridor to the Roseville border.
E. Along from Old Highway 10 to Mounds
. View High School.
F. South of Round Lake between I-35W and Old Highway
10.
G. County Road F between Hamline and Lexington Avenues.
H. Along Highway 96 from I-35W to Lexington Avenue.
I. Within Tony Schmidt Park.
J. Within Bethel and Northwestern Colleges.
K. Within TCAAP and along Rice Creek.
Park and Trail Identification-
None of the trails in the City have names. Individual trails
within the City should be given names and mile markers to
help users find their way and assist with directions. This may
also help the City with maintenance and response to
emergency situations.
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 17
TCAAP is recommended in accordance with the City
Comprehensive Plan.
Charles Perry Park - The residential property adjacent to
Charles Perry should be acquired to minimize the potential
conflict caused by reflected light, noise and trespassing while
providing an opportunity to expand the recreational offerings
in the park and to provide better park access.
Round Lake Park - The open land west of Round Lake Park
should be acquired to provide adequate space for community
soccer fields. The amount of property to acquire should be
determined by the number and size of the fields needed. This
land should be obtained by park dedication and acquisition as
possible.
Hazelnut Park - Parking for Hazelnut Park currently occurs
on Church property. The City has no agreement with
the Church for continued use of that parking area. The
church is contemplating expansion. The City should either
enter into a long term lease and shared use agreement for
parking or attempt to acquire land from the church for park
parking and potentially lease back use of that parking for
peak church parking needs. The parking situation should be
addressed prior to or as part of the church's overall site
development plan.
Cummings Park - Parking for Cummings Park currently
occurs on Fair Issac's company parking lot. The city does not
have a long-term agreement for continued use of that parking.
A long-term use agreement should be obtained or the city
should acquire other adjoining land to provide parking for
Cummings Park.
TCAAP—Describe acquisition recommendations.
Finance —
Funding for the recommended improvement must come form
a variety of sources, but the City of Arden Hills must take and
aggressive and pro-active approach to park and trail
improvement. Approximately $_million in city funds are
• needed over the next 20 years. In addition to city funds the
following potential sources of funding are needed to achieve
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 19
Park and Recreation Facility Recommendations —
Park System —
ark and Trail Ma —Issues and O ortunitie
Add text description of plan.
Indoor Facilities—
Although the was some interest in having indoor recreational
facilities, community input determined that the facilities in
surrounding communities and those provided by the Mounds
View School District and Bethel and Northwestern Colleges
were adequate and within the community there was little
support for spending tax dollars for a separate facility.
Shoreview's community center and indoor swimming pool is
located less that 3/4 mile to the east of Arden Hills and New
Brighton's Community Center(gyms, exercise area and
indoor children's play area) is located 1/3`d mile to the west of
Arden Hills.
Individual Park Recommendations-
Individual site plans were prepared identifying physical park
changes. Additional recommendations are as follows:
Arden Manor
Arden Oaks
Brighton Way
Chatham
Crepeau
Cummings
Floral
Freeway
Hazelnut
Ingerson
Lindey's Triangle
Kenna
Perry
Round Lake
Royal Hills
Sampson
Shehey
Valentine
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 21
APPENDICES -
A. Arden Hills Park, Trail and Open Space Survey Results
B. Public Meeting Summaries
C. Trail Segment Analysis
D. Individual Park Maps and Renovation Recommendations
A Arden Hills Park, Trail and Open Space Survey Results
Introduction
In February 2001 the City of Arden Hills, Minnesota conducted a public opinion survey of
residents. The survey was designed to determine resident's attitudes about park,
recreation and open space issues and to help guide preparation of a park, trail and open
space plan for the city. The written survey was sent to 3,897 households and businesses in
the city. A total of 593 completed surveys were returned for a response rate of 15%.
This is a higher than normal response rate for a mail-back survey and indicates a high level
of interest in city parks, trails and open spaces. This high response gives the survey results
a relatively high degree of accuracy. The margin of error of the survey is plus or minus
4%. A copy of the survey is attached. The following is a summary of the findings,
implications for the park and trail plan and the results for each question.
1) Visitation
Of the 593 returned surveys, 45% of the participants used Arden Hills' parks and trails on
a weekly basis, 21% on a monthly basis and 26% on a yearly basis. These percents
remained mostly constant when broken into the four demographic areas, north, central,
southeast and southwest. The frequency of park use among survey respondents is likely
to be higher than the average resident's use of parks and trails. This is due to the
possibility that park users were more likely to complete and return the survey than non-
park users.
2) Barriers to participation.
Only 8% of those surveyed said they had never used the park and trail system. Of this
8%, the two most frequent explanations as to why the respondent had never used a park
or trail were: 1) The respondent was unaware of parks and trails or 2) The respondent was
new to the community, which might also explain why they are unaware of the existing
park and trail system. Overall, few barriers exist to participation.
Barriers to participation (# of responses):
Not aware of parks 16
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 23
2 Bike 313
3 Children's playgrounds 253
4 Nature areas 199
5 Picnic 188
6 Swim 167
7 Jog/run 165
8 Ice skate/hockey 152
9 Bird watch 143
10 Organized sports 141
11 Informal sports 140
12 Tennis 123
13 Golf 122
14 Cross country ski 117
15 Inline skate 103
16 Outdoor court sports 91
17 Indoor court sports 64
18 Alternative sports 45
5) Desired Outdoor Recreation Elements (in order of respondents requests)
The most frequently requested recreation facilities are trails and passive parks.
• 1 Bike/walk trails 196
2 Natural areas 112
3 Ski trails 106
4 Golf course 82
5 Interpretive/historic areas 78
6 Swimming 64
7 Soccer fields 46
8 Picnic areas 36
8 Children's play areas 36
9 Baseball/softball fields 21
6) Satisfaction/Future Priorities (sorted by priority for the future)
Survey respondents are very satisfied with trails, parks, recreation programs,
communications, and park maintenance. They are less satisfied with the availability of
indoor recreation facilities and special events. Recommended priorities for the future are
trails, park maintenance, and passive parks.
Current Rating Future Priority
Satisfied Unsatisfied High Low
Trails 379 (73%) 143 (27%) 419 (89%) 54 (11%)
• Park maintenance 414 (90%) 46 (10%) 297 (80%) 75 (20%)
Passive arks 355 (77%) 102 (23%) 313 (780/ 89 (22%)
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 25
• Improve exist. athletic complexes 76 (16%) 208 (45%) 180 39%)
Acquire land for athletic parks 73 (15%) 158 (33%) 241 (51%
More alternative recreation 56 (12%) 131 (28%) 288 (61%)
9) Household Age Distribution (# of persons)
0-5 122
6-11 167
12-19 252
20-29 101
30-39 158
40-49 332
50-64 390
65+ 160
10) Types of Trail Surface Preferred
Paved trails are the most popular trail surface. More natural surfaces (woodchip and
grass) may be acceptable in certain locations.
Paved 401
Woodchip 159
Mowed grass 115
Crushed Rock 77
11) Neighborhood Location of Respondents
Southwest 32%
North 31%
Southeast 16%
Central 21%
12) a. Concentrate on existing facilities
Survey respondents feel that the city should concentrate its efforts on improvement of
existing recreation facilities vs. adding new parks.
Strongly Agree Agree Not sure Disagree Strongly Disa ree
159 236 96 51 1
(71% Strongly Agree and Agree) (9% Disagree and Strongly Disagree)
b. Satisfied with rec. service and facilities for tax $
Most residents are satisfied with the recreation value they receive for their tax dollar.
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 27
• CommunityMeeting Summary -
g rY
Community Meeting Summaries - July 9-12, 2001
(#) indicates meeting number.
Introduction -
Four community meetings were held during the week of July 9-12, 2001 at various
locations around the city. Approximately 80 attended the meetings. Meeting participants
provided input regarding the overall city park, trail and open space system and individual
parks and trails. The community input is summarized below. This input combined with
the April, 2001 public opinion survey and interviews with stakeholders and affiliates will
assist the Parks, Trails and Recreation Commission with preparation of the Arden Hills
Parks, Trails and Open Space Plan.
General Comments—
Need Collaboration with Ramsey County Colleges and school Districts. (1,2,3,4)
Picnic Facilities (3)
- Add shelter, shade structures (3)
Save/conserve open space (4)
Indoor Recreation needed for swimming and indoor track, art classes and history center
(4)
Nature Center (1,2,3,4)
Keeping up the existing park system will be adequate (4)
Hwy 96 barrier to movement (When will trails be ready?) (4)
Finish Tony Schmidt system(trail connections to park along Lk. Johanna Blvd., etc) (2)
Plow trails in winter (4)
When will TCAAP be ready(4)
Trail/Signage connections (4)
Trail/road crossing possibility at Hamlin and Snelling RR bridge (3)
Bridge over highway 10 (2)
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 29
Site specific park amenities vs. generalized park amenities (3)
Priority for a comprehensive trail system(w/Ramsey Co. participation)
Larger skating surfaces (3)
Trail connections to North side of A.H. (and Vice versa) (2)
Round Lake polluted, no access (2)
Limit Truck traffic on Johanna Lake Rd (vehicle weight limit) (2)
Trail option south of Presbyterian homes (2)
Fifty/fifty split for paved/non-paved trails (2)
-safety areas or specific use (ie biking) could be paved (2)
-smaller/less traffic trails should be unpaved? (2)
Emphasis on EASE OF USE (2)
Emphasis on CONNECTIVITY(2)
Off-leash dog park ?(2)
No railroad gravel on trails for biking use! (2)
LOW DESIRE for A.H. indoor recreation facility
"Tear drops"to signify"park entrances" and usages (2)
-used as traffic calming strategy along pedestrian thoroughfares.
Help from Shoreview with trail connection to Shoreview(ie funding) (2)
Partnerships with neighbor communities utilizing resources (3)
Site Specific Comments—
Sampson Park-
New playground structure is too small (2)
-designed for tots?(2)
Royal Hills Park-
Trail connection to N Heights Church(4)
Dog Waste container (4)
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 31
Round Lake Park-
Relocate A.H. community gardens to Round Lake (3)
Leave as open space? (3)
Trail link to the west (3)
-to RR bridge and long lake
Charles Perry Park-
Re-evaluate use of space during all seasons
Off road dirt bike trails (3)
Portable skate parks
Bridge easement issues/ improve trails and access to park (2&3)
Seating needed at new playground (2)
Ages of play structures?(2)
Water Fountain?(2)
Shelter Shade structure? (2)
Formal trail needed on south side?(2)
Erosion problems (2)
Road divides hockey rink and warming house (2&3)
"No golfing" signage on west and south sides of park (2)
'/z court basketball w/backstop (2)
Paved surface/ courts inside hockey rinks for summer use (2&3)
Park programming for Perry?(2)
Location of play structure / safety issues/relocate closer to warming house (3)
Add recreational skating rink?(3)
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 33
Parking can be a problem on the street. (1)
Need park sign. (2)
Need traffic sign for park (2)
Sitting benches on Hill overlooking Lindey's Triangle (in between crab trees) (4)
Freeway Park-
Parking is dangerous in the winter. Need a barrier between the rinks and the
parking area. (1)
Need security lighting in the lower area. (1)
Need protective fencing around the hockey rink. (1)
Add a tennis court and backboard. (1)
The path to the ice rink is steep and icy. (1)
Pave the rink for summer use. (1)
Have a full court basketball in the lower area. (1)
Need guard rails between the TH51 southbound entrance ramp and the park. (1)
Add park safety sign on Co. Rd. E. (1)
Balance open skating and parking (1)
Barriers/guard rail for ramp (1)
Chatham Park-
Trail surface unpaved but not dirt (3)
Maintain mixed trail surfaces paved/unpaved (3)
Trail to Venus Ave. (3)
-priority for surface upgrade
-currently used by many groups
Ongoing community involvement/volunteering (3)
• LaCrosse/Soccer Field use (3)
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 35
was rated as poor with erosion deposits in low areas. There are adequate resting places,
however, the benches appear to be unused. Relocation of the benches should be
considered. The aesthetic appearance of the trail corridor was poorly rated. Improved
landscaping is recommended.
Cummings to Floral_Park-
The bituminous trail is varied in topography, partially shaded with good views, wild in
appearance with adequately spaced and located resting areas. The trail surface is cracked
and the trail is slightly overgrown with vegetation. The crossing at Hamlin Avenue is
difficult in spite of striped crosswalk. Maintenance is relatively good.
Lexington Ave from County Road F to Tamarack-
The detached bituminous trail is in average condition with some cracks and settling. There
are no planned resting areas except for bus stops along the route. Landscaping is
recommended to provide screening, traffic separation, seating areas where appropriate.
New Brighton Road to County Road E
This trail is a narrow paved shoulder. The`pavement narrows at the railroad railroad
bridge and is dangerous. It is recommended that this trail be upgraded when New
Brighton Road and the railroad bridge are reconstructed. Segments of this trail should be
detached from the roadbed as possible. This project will require a working relationship
with the railroad and Ramsey County.
• Colleen Avenue to Highwa�96
Roughly a mile of bituminous trail located in a valley between residential back yards. The
trail has been rated well, although it is recommended that additional resting areas be
considered and landscaping to provide some separation from back yards where
appropriate.
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 37
1
,--A EN HILLS
MEMORANDUM
TO: Members of the PTRC
FROM: Tom Moore, Parks & Recreation Director
SUBJECT: Jimmy Johnson and Jennie Michaels
DATE: October 11, 2001
1 have some disappointing news for the PTRC. Jimmy Johnson and Jennie Michaels
have resigned from the PTRC, effective immediately. Don Messerly will come out of the
• bull pen and resume the duties of Chairperson.
I am enclosing Jimmy's resignation letter for you to read. Jennie called me to say that
her schedule was busier than she had originally anticipated. She did however initiate a
willingness to volunteer/help out with PTRC special projects.
If you have any questions or concerns, please feel free to call me at 651-634-5133.
•
October 5 2001
Tom Moore
Director—Parks, Recreation and Trails
City of Arden Hills
4364 West Round Lake Road
Arden Hills,MN 55112
Dear Tom:
I am sending this letter to inform you of my resignation from the Parks,
Recreation and Trails Committee.
The reason for my resignation is to allow more time with my family. Increased
commitments at work has required more travel time on a regular basis. In
addition, my involvement in the hockey program consumes many weekends and
evenings.
• Thank you again for the opportunity to serve on this committee. I feel that the
Park,Recreation&Trails committee has been a great experience, and eagerly
wait to see what the future holds for the committee.
Very truly yours,
woo
James D.Johnson
•
CITY OF ARDEN HILLS
2001 PARKS,TRAILS& RECREATION COMMITTEE
(Meets 4"'Tuesday at 7:00 p.m.)
is Arden Hills City Hall
1. Don Messerly—Chair 7. Roberta Thompson
3915 Fairview Avenue North 3413 Snelling Avenue North
Arden Hills,MN 55112 Arden Hills,MN 55112-3674
(651) 633-7022 (H) (651) 633-3856
Email: dmessimmn@aol.com Email: RobertaAompson@mediaone.net
2. Jim Crassweller 8. Steve Zilmer
1661 Lake View Court 3363 North Dunlap Street
Arden Hills,MN 55112 Arden Hills,MN 55112
(651) 633-3656(H) (651)639-1956(H)
(612) 340-7961 (W) Email: zilmer@juno.com
Email:jcrassweller@riderlaw.com
COUNCIL LIAISON:
3. Pat Krenn Gregg Larson
1230 Wyncrest Court 3377 North Snelling Avenue
Arden Hills,MN 55112 Arden Hills,MN 55112
(651) 631-3136(H) (651)639-9466(H)
(763) 514-4175 (W) (651)639-9474(H-Fax)
Email: krenn@mn.uswest.net (612) 626-9030(W)
(612) 624-2819(W-Fax)
4. Louis Speggen Email: lars@ccbr.umn.edu
1910 West County Road E2 *cover sheet for faxes
• Arden Hills,MN 55112
(651) 636-0827 (H) STAFF LIAISONS:
(651) 765-7703 (W) Tom Moore
719 Spring Creek Circle
5. Rich Straumann Mendota Heights,MN 55118
4380 Arden View Court (651) 683-9926(H)
Arden Hills,MN 55112 (651) 633-5676(W)
(651)636-1796(H) (651) 633-7839(Fax)
(612) 626-6216(W) Email: cityhall@ci.arden-hills.mn.us (W)
(612) 624-1949 (Fax) Email: KNINE123@prodigy.net(H)
Email: strau003@tc.umn.edu
Michelle Olson
6. Don Tix 4364 West Round Lake Road
1770 Lake Valentine Road Arden Hills,MN 55112
Arden Hills,MN 55112 (651) 633-5676(W)
(651)633-9351 (H) (651) 633-7839(Fax)
Email: cityhall@ci.arden-hills.mn.us
•
10/11/01 8
r
,-A EN HILLS
AGENDA
PARKS, TRAILS, & RECREATION COMMITTEE
SPECIAL PARK COMP PLAN WORKSESSION
SATURDAY, OCTOBER 6, 2001
** 9:00 A.M. — 12 NOON **
ARDEN HILLS CITY HALL
4364 WEST ROUND LAKE ROAD
1. The Vision for the Community
2. Review of the Draft (75% completed)
3. Individual Park Review
4. Individual Trail Review
5. Prioritization (if time available)
6. Adjourn
** Please call Tom: (651) 634-5133 or Jim: (651) 628-9406
if you are unable to attend this meeting**
MINUTES
• PAR �c Tn �rr o o nr.r,-,r� .� rr��r rnl��IIRTTTFF
T to day, SkptP_ b 26, 200C 7.nn
---ARD N HILLS CIMIALL--
4364 W. ROUND LAKE ROAD
CALL TO ORDER
Chairperson, Jim Johnson, called the September 26, 2000 meeting of the Parks and Recreation
Committee to order at 7:03 p.m.
MEMBERS PRESENT
Jim Johnson Jim Crassweller
Don Messerly Rich Straumann
Louis Speggen Steve Zilmer
Don Tix
Committee member Patrick Krenn arrived at 8:15 p.m.
MEMBERS ABSENT
None
• OTHERS PRESENT
David Grant, Council Liaison Dave Winkel, Parks Maintenance
Tom Moore, Parks and Recreation Foreman
Director Sheila Stowell, Recording Secretary
Michelle Olson, Recreation Program Joan Lenzmeier, Recording
Supervisor Secretary in Training
APPROVAL OF AGENDA
The agenda was amended to delete Item No. 9, "Review of the three park comprehensive plan
presenters. Recommendation to City Council," as formal Request for Proposals (RFP's) needed
to prepared and received prior to a committee recommendation to the City Council.
APPROVAL OF MINUTES
Minutes of the August 22, 2000, Parks, Trails and Recreation Committee were approved by
consensus as presented, with a minor time correction from 6:00 p.m. to 7:00 p.m. of the next
meeting at that time, scheduled for 7:00 p.m.
COUNCIL LIAISON REPORT
Council Liaison Grant provided a report of recent Council events, including logo design; and an
update on City Hall construction.
•
ARDEN HILLS PARKS, TRAILS & RECREATION COMMITTEE
• SEPTEMBER 26, 2000
a
REQUEST FOR QUALIFICATIONS,PRESENTATION FOR PROPOSED
COMPREHENSIVE PARK PLAN
At 7:00 p.m., Mr. Greg Ingraham of Ingraham and Associates presented his firm's projected
Master Plan for a Comprehensive Park Plan for the City of Arden Hills. Mr. Ingraham listed as
his credentials service as the former Director of Parks and Recreation for the City of
Bloomington, MN; development of the City of New Brighton's Comprehensive Park Plan; and
the recent Needs Assessment for the Mounds View School District.
Mr. Ingraham reviewed their firm's proposed Master Plan if their firm were chosen to provide
the Comprehensive Park Plan; and provided several potential activities that would be pursued.
The Committee posed questions to Mr. Ingraham, which he responded to accordingly.
PARKS AND RECREATION DIRECTOR REPORT
Mr. Moore provided an update on current activities including draining of irrigation systems; re-
keying of the warming houses; Ramsey County proposed signage for several crosswalks between
trails; and a recently-completed tree inventory and proposed future maintenance of trees within
the City's numerous parks.
• RECREATION PROGRAM SUPERVISOR REPORT
Ms. Olson provided a staff memo entitled, "Summer Program Report Summary," and verbally
reviewed highlights of the summer programs.
Mr. Crassweller inquired about the possibility of providing more personal solicitation, rather
than just distribution of flyers and brochures to students. Ms. Olson expressed concern with
willingness of school officials and teachers to available time and classroom interruptions;
however, staff indicated they would research the possibilities.
Councilmember Grant requested, and staff responded to, potential for expansion of the City's
soccer program for older children.
Ms. Olson requested suggestions for volunteer manpower assistance with the upcoming Pumpkin
Hunt scheduled for October 271n
Ms. Olson indicated continuing problems encouraging timely registrations for upcoming after
school programs for Skyhawks.
ARDEN HILLS PARKS,TRAILS & RECREATION COMMITTEE
• SEPTEMBER 26,2000
REQUEST FOR QUALIFICATIONS, PRESENTATION FOR PROPOSED
COMPREHENSIVE PARK PLAN
At 7:45 p.m., Bob Coster, Augie Wong, Katherine Ryan, and Barry Gore from BRW provided
their credentials and presented an overview of their firm's approach for a Comprehensive Park
Plan.
Committee members posed questions regarding aspects of the presentation, and Mr. Coster
responded accordingly.
Council Liaison Grant expressed concerns regarding several recent design options presented by
BRW(i.e., a proposed warminghouse at Ingerson Park, and suggested extension of a section of
trail), and the unrealistic cost estimates of those two projects. Mr. Grant stated that any proposed
improvements related to a Comprehensive Park Plan needed to be realistic and feasible.
REVIEW OF WINTER ICE RINK PROGRAM
Director Moore introduced the next agenda item, entitled "Review of the Winter Ice Rink
Program," with staff providing a written and verbal recap of the 1999/2000 season.
• Committee member Crassweller responded that he would prefer that the committee review the
Valentine Park ice rink issue as a separate item at this time.
At that point, Mr. Moore reviewed the numerous e-mails, petition, and correspondence received
by staff as related to the Valentine Park ice rink, and provided for committee members in the
packet. Mr. Moore introduced the Valentine Hills neighborhood representative, Fran Holmes.
Ms. Holmes provided an overview of neighborhood concerns regarding re-establishment of the
ice rink at Valentine Park. Ms. Holmes expressed concern regarding the decision to close the ice
rink, and questioned the City's rationale regarding costs,the aesthetics of continuing the
"neighborhood"rink; and warminghouse staffing issues.
Mr. Moore responded to Ms. Holmes, from a staff perspective, reviewed programming issues for
Valentine Park ice rink and provided additional information regarding the process; usage;
maintenance; staffing and budget concerns; Comprehensive Park Plan development; and then
deferred to Ms. Olson to continue addressing staff concerns.
Ms. Olson discussed various programming issues, providing a historical perspective for the staff
and Council's decision to no longer have an ice rink at Valentine Park. Ms. Olson deferred to
Dave Winkel, the City's Parks Maintenance Foreman, to provide his expertise regarding various
maintenance issues.
• Mr. Winkel addressed the various maintenance issues, using a visual display of the park and
warminghouse. Those issues included the location of the ice rink on the softball infield and
ARDEN HILLS PARKS,TRAILS & RECREATION COMMITTEE
• SEPTEMBER 26, 2000
related ag lime performance issues; formal availability of gravel parking lot vs. current asphalt
for the skating rink; soil structure of the park(peat) and seasonal heaving; difficulty in berming
the skating area due to the substantial sloping of the park; continued flooding of the
warminghouse relative to the lake level at Valentine Lake; makeup of a berm for the ice rink;
relocation of the skating rink and lack of parking alternatives. Other items addressed were the
sewer manhole location in the middle of the parking lot; potential culvert plugging problems;
access road for tanker truck; past lack of usage with no warminghouse; and location of lights.
Committee members continued discussion, including potential relocation of the warminghouse;
location of the ballfield; safety issues; parking area blacktopping; ice rink no longer being
feasible; potential removal of blacktop, since it's alligator-cracking at this time; and potential
need for additional lighting.
Committee member Crassweller posed questions to staff, including if there were any way to
downsize the rink to have a sheet of ice that residents could use; if there were enough snow,
could a small rink be sufficiently bermed; light timer possibility; potential cost of other material
for berming; and black dirt vs. ag-lime base.
Ms. Holmes responded to committee members that the neighborhood was not concerned with the
• rink being smaller.
Council Liaison Grant expressed concerns regarding potential closing of the pleasure rink at
Cummings Park, and the need to keep an adequate number of pleasure rinks in the community.
Mr. Moore addressed several additional issues from a budget standpoint, stating the cost of
$7,000 to maintain each ice rink location at$3,500 per rink(i.e., equipment, warming house
staff, maintenance, etc.). Mr. Moore also addressed the recently-completed comprehensive
drainage survey and future use of Valentine Park as a proposed stormwater treatment pond; and
status quo of park projects, future capital improvement purchases until the overall park
comprehensive plan has been completed.
Staff recommends that Valentine Park ice rink remain closed until the final report for the
Comprehensive Park plan is complete, and at that time, focus on the findings of the report and
work from there.
MOTION: Crassweller moved and Messerly seconded a motion directing staff to provide a
committee recommendation to the City Council that staff be authorized to
construct a small, limited-use ice rink at Valentine Park this upcoming season;
that the ag lime be pealed back to allow for berming a rink, using Mr. Winkel's
discretion for construction of the rink; and that a timer or photo cell system be
installed for Valentine Park lighting so that the warminghouse could remain
closed, with no ice rink attendant. The motion carried unanimously.
•
• ARDEN HILLS PARKS, TRAILS & RECREATION COMMITTEE
SEPTEMBER 26, 2000
Discussion ensued regarding tracking actual usage of the ice rink. Mr. Winkel responded that
the maintenance crews would be able to determine use from ice shavings during their daily
sweeping of the rink; and Ms. Holmes responded that she would be willing to survey the
neighborhood as well.
Staff recommends that,based on last season's final rink numbers, Cummings Park pleasure rink
be eliminated, due to it being hard to maintain, and safety issues regarding the dangerous
location down slope from the hockey rink.
MOTION: Crassweller moved and Messerly seconded a motion to recommend to the City
Council that the pleasure rink at Cummings Park be eliminated, due to safety
concerns. The motion carried unanimously.
Committee member Speggen expressed concern that the rinks be monitored to prevent hockey
players from overriding pleasure skaters during public skating times and due to the elimination
of the pleasure rinks.
Staff also sought direction on the issue of ice rink rental during public skating time.
• Staff provided current program policy during public open skating was that one (1)hour
maximum could be reserved during public skating at no charge. Staff provided additional
comments regarding concerns of residents and rink attendants; additional practice time for
hockey teams and research with other area cities. Staff reported on their research with the cities
of Roseville, Shoreview and Vadnais Heights regarding rentals during public use times. Staff
reported that none of those three cities allow rentals during public use times. City staff
recommends that, with the exception of two (2) hours per week for local hockey association use,
no rentals be allowed during public use time.
MOTION: Krenn moved and Zilmer seconded a motion to recommend to the City Council
that staff be directed to no rentals be allowed during public use time, with the
exception of two (2)hours per week for local hockey association use, and that
adequate signage be provided stating City policy at the appropriate rinks. The
motion carried unanimously.
Staff also sought direction on the rental fee of$25.00 per hour for ice rinks. Last season's policy
was that all rentals (after hours) required a rink attendant on duty at a rental fee of$25.00 per
hour to cover staffing and lighting. Staff recommended that this policy remain status quo.
MOTION: Crassweller moved recommendation to the City Council that the ice rink rental
fee be increased to $35.00/hour. After further discussion, Mr. Crassweller
withdrew the motion.
4
• ARDEN HILLS PARKS, TRAILS & RECREATION COMMITTEE
SEPTEMBER 26, 2000
Staff noted that the Bethel College Athletic Department has a separate rental fee, and their
program is handled differently, with Bethel providing their own rink attendant. It was staff s
recommendation, and committee consensus,that this usage remain status quo.
Staff and committee members discussed continuing issues with residents and the use by Bethel
of off rink(broomball) during public times. Ms. Olson stated that she would be addressing these
issues at Manager's meetings for Bethel in the near future. She indicated that they would be
advised that they needed to adhere to the rules of the City for rink usage, and the City's posted
schedules. Committee members requested copies of the schedules to assist in monitoring of ice
usage. Resident concerns included lights being on after normal hours.
MOTION: Crassweller moved and Johnson seconded a motion to recommend to the City
Council that the ice rink rental fee, as recommended by staff, remain at its current
rate of$25.00 per hour. The motion carried unanimously.
PARK TOUR THREE
Chairperson Johnson discussed the logistics of the planned final park tour, number three. It was
the consensus of the committee that staff would provide each member with an informational
• packet, with a brief description of the park's current and potential usage, and that committee
members would individually tour the remaining four parks, Crepeau, Freeway, Floral, and Royal
Hills. Staff should inform committee members of the anticipated return of the park surveys, so
staff could summarize comments prior to the next meeting. Committee members also requested
maps of the parks, parking and access points.
In a related note, Mr. Moore advised committee members that he and Mr. Winkel were
coordinating with a Boy Scout troop for wood chips to be placed on trails in Crepeau Park.
NEXT MEETING
The next meeting of the Parks, Trails and Recreation Committee is scheduled for Tuesday,
October 24, 2000 at 7:00 p.m.
ADJOURNMENT
MOTION: Crassweller moved and Johnson seconded a motion to adjourn the meeting at 9:30
p.m. The motion carried unanimously.
Respectfully Submitted
Sheila Stowell
Recording Secretary
® Arden Hills Park, Recreation and Trail Commission
Arden Hills Park, Trail and Open Space Plan
Workshop Session
Tuesday, October, 30, 2001 7PM—9PM
Arden Hills City Hall
Draft AEenda
1. General discussion of draft plan content and format
2. Determine plan implementation priorities—Draft recommendation attached
3. Hand in redlined/notated plan copies and maps
4. Neat steps and other items
5. Set next meeting date
6. Adjourn
' OCT-30-2001 09: 11A FROM:INGRAHAM & ASSOCIATE 612 377 2500 TO:65163,15137 P:2-1
Arden Hills Park, Trail and Open Space Plan
DRAFT RECOMMENDATION - 10/29/01
Priorities and Implementation Recommendations 2001-2005
Trails—
Round Lake Trail—Get remaining easements and complete the trail along west Round
Lake.
Railroad Bridge Crossing over I-35W. Work with MNDOT and the Railroad to utilize
existing railroad bridge for a trail crossing over the interstate. (ISTEA Grant, funding
from Arden Hills, New Brighton and Ramsey County)
Continue to lobby for a railroad underpass between Tony Schmidt and Perry Park (work
with County and railroad) Use local leverage in negotiations between County and
railroad. . $0-staff and committee time
Charles Perry Park—Add a N-S trail connection with the County(pending County acq. of
underpasss) from the railroad to Mounds View High School. Add a trail connection from
parking lot to pump house. $20,000
• Lobby for a pedestrian/bike bridge/lanes over TH51 at County Road E. Work with
County and State. Get this on their priority list. . $0 - staff and committee time
Get the trail along County E built from Snelling to east of Hamline Ave. (County
project). $ ?city share if any of trail construction.
Make trails connections at Cleveland Ave. south to Roseville and from Tony Schmidt to
the diagonal trail (trail should be named)through Sampson and Hazelnut Parks. $40,000
Connect Crepeau Park to County Road E trail along Pine Tree Drive. $30,000
Park Renovation—
Add new park and trail signage at all parks and trails,have park and trail system maps
installed at key outdoor locations, and available at City Hall. $17,500
Install ADA access upgrades(seek MnDNR grants) Connect park features with a paved
trails at Arden Oaks, Floral,Hazelnut, Ingerson, and Valentine Parks. $125,000
Charles Perry Park - Relocate access drive and build new warming house. $135,000.
Freeway Park— Add a parking lot. $25,000.
•
OCT-30-2001 09:12A FROM:INGRAHAM & ASSOCIATE 612 377 2500 T0:6516345137 P:3 4
• Ingerson Park—Add a disc golf course (partner with disc golf assn. for design and partial
funding). $7,500
Valentine Park renovation. $120,000
Lindeys Triangle Park— Add gateway sign and plantings. $6,500.
Cummings Park—Add a directional signs to the park. Provide long-term parking. Signs
$750. Parking $75,000
Add trees for shade at key locations and additional benches and picnic tables.
$10,000/year
Crepeau Park—Work to create an integrated trail network,marked trails, a defined a
entrance point(s) and an area trail map. $25,000
New park and open space acquisition—
Obtain long-term parking and access agreements/land for Hazelnut Park (with church)
and Cummings Parks(Fair Isaac). Unknown$
TCAAP— Work with developers and the property owners to acquire trail corridors,
neighborhoods and community parks and open spaces as per the park and trail master
• plan. As development occurs and opportunities arise. . $0- staff and committee time
Partnerships -
MnDOT & Ramsey Co. Transportation-Establish/enhance working relationships with
MnDOT and Ramsey County Transportation and make sure the trail crossings and trail
additions are in their transportation master plans, CIP's and are a priority for funding and
implementation. On-going effort. Cooperate on joint funding applications(Federal T-21,
etc.) Make sure trail crossings get incorporated into the TH96 reconstruction. . $0 - staff
and committee time+any matching city funds for grants on a project by project basis.
TCAAP—Work with the land owner/manager to build trails,expand public access and
build a joint athletic complex(with other partners). . $0 - staff and committee time
Ramsey County Parks—Work with them to get implementation of Tony Schmidt Master
Plan and Rice Creek Park trails. . $0 - staff and committee time
Mounds View School District—Work with District to improve trails on school property.
$10,000.
Bethel and Northwestern Colleges—Work to expand and enhance public trail access. $0 -
staff and committee time
OCT-30-2001 09:120 FROM: INGRAHRM & ASSOCIATE 612 377 2500 T0:6516345137 P:4-1
r
Other-
Put together a 5 year CIP, based on these initial priorities and review and adjust it
annually. $0— staff and committee time
Continue and expand woodland management/buckthorn removal, etc. (Chatham,
Crepeau, Hazelnut, Perry, etc.) $10,000/year
Cummings Park-
No water in the park (4)
Limited Parking /need more(4)
Signage (4)
Floral Park-
Long walk to ball field(4)
Parking (4)
Water? (4)
North/West Trail Connection(4)
Water problem/hwy rain(4)
Drainage issue on Trails (4)
More Tennis Courts (Royal Hills) (4)
Trail Segment Analysis—
Individual trails within the City were rated by members of the PTRC based on a variety of
criteria: (List them, or provide an example of a rating sheet)
Lake Johanna Blvd—Lake Johanna Blvd is a paved shoulder trail on a County Road. The
trail is well used and the traffic levels are high. The surface condition of the trail has been
rated as below average. The City should work with the County to provide adequate
maintenance of the trail and to provide a detached trail where possible, work to reroute
truck traffic to other roads, and maintain lower speeds. This trail has great potential as
Lake Johanna Blvd will need reconstructing in the near future. The City should partner
and work with Ramsey County,Northwestern College and MnDOT to provide a looped
trail around Lake Johanna.
Samson/Hazelnut Trail—The bituminous trail is well maintained with only a few cracks
and damaged areas and is aesthetically pleasing. The trail terminates with a flower garden
at Cleveland Avenue. The trail is broken up with two parks, Sampson and Hazelnut
where there is adequate seating and facilities. A Trail Sign and map with is recommended
at the trail ends with landscaping.
Trails in Samson/Hazelnut Trail—The bituminous trail received an above average rating. .
The surface is rough for inline skating, but has adequate width and length. Maintenance
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 36
Add bridge and trails across the swamp? (3)
Crepeau Park-
Add a childrens play area for the Hunters Park Neighborhood. (1)
Add playground equip. by Benton way(1)
The wood chip trails are nice. (1)
Need Buckthorn(invasive species) removal and woodland management. (1&2)
Boyscout project (1)
-Bridge or stone crossing for wildlife (1)
- add bird houses (1)
-Re-plant prairie area(1)
MSI restricts bike and inline trail use
Water off Lexington-weeds (2)
Water quality-erosion
Management/maintenance of storm ponds
Add picnic tables and trash cans. (1)
A trail map is needed. (1)
Species Diversity (2)
Ingerson Park-
Can a "back way" (easement) trail to Ingerson Park be found?(1)
Keep the sliding hill. (1)
Frisbee golf might be a good use if it does not interfere with sliding. (1)
Lindey's Triangle Park-
Keep Lindey's as a park. Replace the backstop. (1)
Keep it for flexible open play space. (1&2)
Kites (2)
Soccer (2)
Parking issues (2)
Lacrosse (2)
Softball (2)
Add an exercise station. (1&2)
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 34
B Ball Field—T ball only(4)
Parking no sufficient/ check on why no parking signs exist (4)
Valentine Park-
Raise grade, effective drainage vs. incremental improvements (3)
Park is integral to the community(3)
Need path/entrance to park form neighborhood (3)
Flooding of parking lot vs. infield/grade issues(3)
Picnic tables with shade (3)
Swings (3)
Reconsider layout of park (parking orientation parallel to Valentine road , grading
etc...) (3)
Hazelnut Park-
Need better maintenance of park land (2)
-dead tree removal
-trimming of trees/ grasses
Auto traffic on Pedestrian trails is major problem(2)
Hazelnut trails do not accommodate biking /roller blading etc. (2)
Wider Trails(2)
Need benches/seating (2)
Invasive species problems/"Chinese elms" (2)
Delineate sides of trail for "walkers"/"bikers" (2)
Fix dilapidated fencing (2)
Hockey"dropoffi' problem(2)
-add lights from church parking to hockey rink
-pave hockey rinks (3)
Sledding skating conflict (2)
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 32
Cooperation with the colleges (1,2,3,4)
Park and Rec info pamphlets etc. out to community(3)
Feeling of neighborhoods being landlocked?
Focus on non-motorized trail connections (1)
Make bridges usable for pedestrians and bikes and skaters/rollerbladers. (1,2&3)
Loop bike route around Lake Josephine (1)
Create gathering places for kids within neighborhood parks. (2)
Lindeys should stay a park. (2)
County removed softball backstop in Tony Schmidt. (2)
Storm water pond maintenance is needed - i.e. pond by Tiller Lane and south end of
Creapau Park. Siltation and debris. Need maintenance plan involving City, homeowners,
County and Rice Creek Watershed. Runoff comes form Lexington Avenue. (1)
Crepeau as a neighborhood park w/play structure (2) i
Lack of water supply at parks is not a priority issues for users.(1&2)
Large roads are barriers which require people to drive to reach nearby parks. (1&2)
People aren't aware of the City parks and trails. (1)
Better park identification signs are needed & signs showing trail connections etc (1,2,3)
Add "children playing" or "park - slow " traffic safety sign near the parks. (1)
Need safe access from neighborhoods to parks (3)
Ingraham&Assoc. to help facilitate county involvement in Arden hills park improvements
(2)
Explore trail options w/West Lake Johanna(2)
-alleviate problems w/ "danger trails" (i.e. auto traffic conflicts etc)
-displacement of trail users to Old Snelling and New Brighton Blvd
Loop trail needed to move trail users off streets (2&3)
Skating trail/canal? (3)
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 30
Strongly Agree Agree Not sure Disagree Strongly Disagree
87 305 94 62 12
(70% Strongly Agree and Agree) (14% Disagree and Strongly Disagree)
bl. Satisfied with service if fee increase
Fee increases would slightly diminish people's opinion of recreation value for their tax
dollars.
Stroh Agree Agree Not sure Disagree Stroh Disagree
56 1204 205 59 21
(48% Strongly Agree and Agree) (15% Disagree and Strongly Disagree)
W. Satisfied with service if tax increase
A property tax increase would further diminish people's opinion of recreation value for
their tax dollar. However, more people would still be satisfied than unsatisfied if a tax
increase occurred for park and reaction purposes. There may be sufficient support for a
future bond referendum for select trail and recreation improvements.
Strongly Agree Agree Not sure Disagree Strongly Disagree
57 143 185 102 �58
(37% Strongly Agree and Agree) (29% Disagree and Strongly Disagree)
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 28
Indoor recreation 209 (58%) 152 (42%) 224 (59%) 153 (41%)
Communications 341 92%) 29 (8%) 183 (56%) 145 (44%)
Active parks 327 (82%) 70 (18%) 191 (53%) 172 (47%)
Rec. programs 6-12 260 (90%) 28 (10%) 123 (41%) 179 (59%)
Special events 209 (63%) 121 27% 120 (36%) 209 (64%
Rec. programs U6 264 (89%) 34 (11%) 98 (33%) 203 (67%
Rec. programs 19-64 223 (78%) 62 (22%) 101 33%) 205 67%
Rec. programs 13-18 225 (85%) 39 (15%) 91 (31%) 200 (69%)
Rec. programs 65+ 227 (83%) 46 (17%) 82 (28%) 213 (72%)
Average (20%) (49%) (51%)
80%
7) Indoor Recreation Facility Needs
Respondents are interested in a fitness center, indoor track, and swimming pool.
Fitness center 264
Run/walk track 223
Swimming 194
Golf practice 117
Gyms 109
Aerobics 108
Tennis 85
Climbing wall 83
Racquetball 79
Play equipment 77
Soccer 43
Auditorium 36
Skateboard 21
8) Support for Improvements (from highest to lowest amount of support -Great and
Marginal support totaled)
There is community support for bike and walk trail additions, renovation of existing parks,
improvements to passive parks and for acquisition of passive parks and open space lands.
There is little support for acquisition of land for new athletic parks or for alternative forms
of recreation.
Great Marginal None
Bike/walk trail additions 298 (58%) 134 (26%) 78 (15%
Renovate existing arks 134 (28%) 266 (55% 87 (18%)
Improve exist. passive parks 183 (37%) 213 (43%) 100 (20%
Acquire land for passive parks 154 (32%) 170 (35%) 1 162 (33%
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 26
Prefer other parks 7
Not interested 7
Parks hard to find 5
Inadequate transportation 1
3) Park& Trail Use
Tony Schmidt Park is the most frequently visited park in Arden Hills. The survey results
indicate that residents from all areas of Arden Hills use Tony Schmidt Park equally.
Residents from all areas of the city also frequently use Cummings, Floral, Valentine
Hazelnut and Perry. As expected,the frequency of use for each park seems to be based
on their specific amenities, size and location. A smaller park such as Sampson, is
frequented more often by residents who live close to the park. Trail usage ranked high
among those surveyed. However, many of those surveyed commented on the need to
expand or improve the current park and trail network. Several respondents said that at
times, trail users are forced to walk along busy or unsafe roadways to navigate the trail
system.
Park Use (# of responses in order of most to least frequented)
City trails 235
1 Tony Schmidt 214
2 Cummings 174
3 Valentine 121
3 Floral 121
4 Hazelnut 117
Prefer other parks 7
Not interested 7
Parks hard to find 5
Inadequate transportation 1
3) Park& Trail Use
Tony Schmidt Park is the most frequently visited park in Arden Hills. The survey results
indicate that residents from all areas of Arden Hills use Tony Schmidt Park equally.
Residents from all areas of the city also frequently use Cummings, Floral, Valentine
Hazelnut and Perry. As expected, the frequency of use for each park seems to be based
on their specific amenities, size and location. A smaller park such as Sampson, is
frequented more often by residents who live close to the park. Trail usage ranked high
among those surveyed. However, many of those surveyed commented on the need to
expand or improve the current park and trail network. Several respondents said that at
times, trail users are forced to walk along busy or unsafe roadways to navigate the trail
system.
Park Use (# of responses in order of most to least frequented)
City trails 235
1 Tony Schmidt 214
2 Cummings 174
3 Valentine 121
3 Floral 121
4 Hazelnut 117
4 Perry 117
5 Crepeau 71
6 Royal Hills 61
7 Ingerson 40
8 Freeway 35
9 Arden Oaks 29
10 Lindeys 23
10 Sampson 23
11 Arden Manor 11
4) Recreation Participation (in order of most frequented activities)
Walking and biking are by far the most the most popular recreation activities. Use of
children's playgrounds, nature areas, and picnicking and bird watching are popular
activities. Popular active recreation includes swimming, running/jogging skating and
hockey and team and informal sports. Arden Hills residents seem to prefer trail and
passive park use.
I Walk/hike 482
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 24
Implementation and Priority Recommendations -
Grade Separated Trail Connections
Trail Extensions
Park System Recommendations
Park and Open Space Acquisition and Easements
Individual Park Renovation Recommendations
Draft Capital Improvement Plan
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 22
the vision established by the community and reflect in this
plan: 61
List funding sources and potential partners
City Capital Funding—
Appendix D contains a summary of park,trail and open space
recommendations and their estimated cost. The following is
a recommended five year Capital Improvement Plan (CIP) for
park,trail and open space improvement in 2002-2006.
Insert 5 year CIP
Grants—
List grant opportunities
Partnerships—Within the City of Arden Hills, there are great
opportunities for public private partnerships for shared use of
parkland and private or corporate properties or partnerships
with Bethel and Northwestern Colleges. In particular, it may
be possible to improve upon the relationship between MSI
Insurance and Crepeau Park to share parking and signage and
to expand the facilities for both. Similar opportunities may
exist with other large corporations such as ( company).
Similarly, partnerships with Bethel and Northwestern College
should be made or improved to provide community use of
trails and athletic facilities.
Other partnerships include working with the Rice Creek
Watershed District, Ramsey County and the U.S. Army to
complete missing sections of the Rice Creek Park and Trails
and to hasten the release of TCAAP land. Furthermore, the
City, MnDOT and Ramsey County should coordinate efforts
to improve trails along County and State roads and within
County Parks to better respond to the community's desires.
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 20
New park signage is also needed. Existing parks signs are too •
small or non-existent. A common sign design should be
developed and consistent park and trail identification signs
should be placed in the parks and along trail corridors.
A park and trail system map was developed as part of the
planning process. This map should be reproduced on weather
resistant materials (i.e. ) and displayed in
the City parks and at major trails entrances. An overall park
and trail map will help residents find parks and trails and
connect neighborhoods. Many residents are unaware of the
existing park and trails in Arden Hills. This map could also be
copied as a handout guide for interested citizens.
Park Renovation—
The City of Arden Hills should continue to upgrade and
renovate existing parks based upon a year
capitol improvement plan and in an effort to meet changing
demographics, public safety and the desires of the community.
Maps indicating individual park improvement
recommendations have been prepared based upon input
received from the community through four public meetings,
from service organizations and from the PTRC. The
individual park maps are attached as Appendix_. The
recommendations are intended to improve public safety,
aesthetics, function and efficiency of individual parks. Future
park improvements should be based upon these
recommendations and funding supply. The individual park
renovation recommendations are summarized below.
List park name and summarize revitalization
recommendations.
Park and Open Space Acquisitions -
To improve the function of existing parks and to provide
better service to certain neighborhoods, park and openspace
acquisitions have been recommended for two parks and
parking easements or acquisition is recommended for two
other parks. Dedication of park, trail and open space on
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 18
•
Recommendations —
Grade Separated Trail Connections—
Constructing grade separated trail crossings of major roads
and railroads is one of the most important actions the City can
take to improve the trail network, enhance access to parks
and tie the community together. Federal T-21 grants are
available for many of these trail crossing improvements. The
following are priority trail crossings:
County Road E over Highway 51/Hamline Ave.—The
existing bridge is very narrow and unsafe for pedestrians or
bicyclists. This location is a key connection between the east
and west portions of the city. The City should work with
Ramsey County and MnDOT to either expand the bridge
width to create adequate pedestrianibike crossings or build a
freestanding bike/walk bridge next to the vehicle bridge.
Highway 96 - Trail underpasses should be installed at
selected locations between Highway 10 and Lexington
Avenue, when Highway 96 is rebuilt. These grade-separated
connections will provide access to City Hall and the TCAAP
area. A trail crossing of Highway 10 should also be
incorporated into the Highway 96/10 intersection, when it is
rebuilt.
Highway 10—Two grade-separated trail crossings are
proposed. One,just south of Royal Hills Park and another
within TCAAP, north of Highway 96.
I-35W—Convert the existing railroad bridge located just
north of I-694 to a pedestrian/bike trail crossing. This trail
would connect the Round Lake area to the City of New
Brighton trails. A second trail bridge is proposed to be
located north of Highway 96 to connect the TCAAP area
with Long Lake Regional Park and New Brighton.
Mpls. St. Paul& Sault St. Marie Railroad—Ramsey
County proposes to construct a north- south trail crossing
under the railroad tracks between the south section of Tony
Schmidt Park and Charles Perry Park/north section of Tony .
Schmidt Park. This north-south trail link is very important as
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 16
8. There is very little difference in attitudes among different
geographic areas of the city.
Recommendations based on the survey results -
1. The Arden Hills trail plan identifies needed trail
connections, pedestrian/bike bridges and new trail
opportunities.
2. Loop trails are proposed in many existing parks. .
3. Park renovation and revitalization recommendations for
existing parks are summarized starting on page_and shown
on maps in Appendix C.
4. Significant open space and trails are planned for the TCAP
area.
5. Partnerships to acquire land/easements and construct
recreation improvements are a key to long-term success. .
6. Existing natural areas such as Crepeau Nature Center
should be enhanced.
7. Given the proximity to existing recreation centers and the
population base, the costs of an indoor recreation facility
are likely to outweigh the benefits.
8. A variety of funding sources are needed for desired park,
recreation and open space improvements.
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 14
are willing to travel to obtain better quality or more
specialized activities.
Current trends—The following recreation trends have been
observed in the Twin Cities over the last ten years:
- Trail use has boomed (walking running, biking and skating).
-Non-contact recreation activities are growing.
- Interest in arts and natural areas is growing.
- Most team sports participation has plateaued or in some
cases declined.
- More youth are specializing in one sport and training year-
round.
- Golf has increased in popularity.
- Women's sports have increased.
- Off-leash dog parks are popular.
Implications and Future Trends - The following are likely
trends based on Arden Hills demographics and the public
opinion survey:
1) Trail use will remain strong and interest in trail expansion will
continue. ('Trails expansion and connections)
2) Individual activities will continue to be more popular than
team or group activities. (multi-use trails, and open space)
3) Interest in natural resources and open space will remain
strong. (TCAAP area and other resource areas)
4) Recreation facility development and operation partnerships
between government agencies, schools, organizations and
corporations will be more frequent. (Local partnerships)
5) Demand for youth activities and facilities may increase.
(Retain park space and flexibility to meet future needs)
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 12
It is hoped that the depth of participation in the planning •
process will pay dividends by creating ownership in the plan
and political support for the resource allocations needed to
implement the plan recommendations.
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 10
i ure B Existing Park and Trail Ma
i
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 8
Introduction -
The intent of this park, trail and open space plan is to act as a
guide to park, trail and open space decision-making and
improvements. The Plan is designed to address recreation
needs between 2001 and 2020. The city recognizes that
demographic, recreation and environmental trends will change
over the next twenty years and those changes will affect park,
trail and open space needs. However, the Plan will help set
the framework for funding, operations and improvements and
will increase efficiency by establishing a long-term vision and
priorities.
The plan includes a park and trail system map, a review of
recommendations, renovation recommendations for existing
parks, land and easement acquisition recommendations and a
funding strategy.
•
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 6
Mission and Vision -
Department Mission Statement -
The Arden Hills Park and Recreation Department is dedicated
to serving the people of Arden Hills by providing a
comprehensive, well maintained system of parks, trails and
open spaces and a balanced program of affordable recreation
activities.
Plan Vision Statement -
TBD by PTRC and staff
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 4
t
n Summary —
Plan ry
The Arden Hills Park Trail and Open Space Plan is a guide to
the future use, improvement and expansion of the Arden Hills
recreation system. Parks, trails and open space are essential
components of community quality of life and are highly valued
by city residents.
This plan is intended to act as a guide to decision-making
regarding recreation facilities.
Key elements and recommendations are:
1. Trail Improvement and Connections
Arden Hills is divided by many major roads, highways and
railroads. These transportation corridors provide excellent
regional access and mobility, but they separate neighborhoods
and separate people from parks. Trails connection across,
over or under the major highways and railroads are needed to
tie the city together, create a true system of parks and trails
and to enhance the feeling of community.
Residents also want trail improvements to existing trails, the
addition of new trail segments and internal loop trails within
parks. A variety of trail functions and surfaces are desired.
The trails master plan illustrates the city's vision for a
comprehensive trail network. Building this network requires
assistance from other agencies (such as MNDOT and Ramsey
County) and the commitment from the city to improve and
create trails on an annual basis.
2. Park Improvements
Overall, residents are satisfied with Arden Hills parks.
However, improvements are desired which will improve
function and usability of existing parks. These improvements
range from adding a bench and shade trees near a children's
play area to a reconfiguration of a park access road, parking
lot and shelter building to increase safety and assure long term
use of the park land. A systematic long-term approach to
these improvements is proposed.
3. Open Space and Park Acquisition
Arden Hills Park, Trail and Open Space Plan DRAFT October 1, 2001
Page 2