Loading...
HomeMy WebLinkAbout07-17-23-WSMayor: David Grant lt Councilmembers: -AEN HILLS Brenda Holden Emily Rousseau City Council Work Session Tena Monson Tom Fabel Agenda July 17, 2023 5:00 P.M. City Hall Address: 1245 W Highway 96 Arden Hills MN 55112 Phone: 651-792-7800 Website: www.cityofardenhills.org City Vision Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long-standing tradition as a desirable City in which to live, work, and play. This meeting can be accessed remotely by joining via Zoom (see Public Inquiries/Informational below for instructions) This meeting will be streamed live on local Cable Channel 16 and available for playback on our website. CALL TO ORDER 1. PUBLIC INQUIRIES/INFORMATIONAL Members of the public are invited to remotely monitor the City Council meeting via Zoom using the below link. Members are also welcome to provide public comments during this section of the agenda via Zoom. Members wishing to provide public comment must use the "raise hand" feature in Zoom to identify themselves as wanting to make a public comment and will be called upon to provide their public comment during this portion of the agenda. Those that speak must state their name and address for the record. HTTPS://US02WEB.ZOOM. US/J/86302803885 Please make sure you have the most up-to-date version of Zoom to participate in the meeting This is an opportunity for citizens to respectfully bring to the Council's attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents may be distributed to the Council prior to the start of the meeting to allow a more timely presentation. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting. 2. RESPONSE TO PUBLIC INQUIRIES 3. AGENDA ITEMS 3.A. Buckthorn Removal Presentation Mark Kelliher, PTRC Member Documents: MEM PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 3.13. State Of The City Update Luke Cardona, Senior Communications Coordinator Documents: MEM PDF 3.C. THC And Adult Use Cannabis Discussion Jessica Jagoe, Community Development Director Julie Hanson, Assistant to the City Administrator/City Clerk Documents: MEM PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 3.D. 2023 2nd Quarter Financials Gayle Bauman, Finance Director Documents: MEM PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF 3.E. 2024 - 2028 Capital Improvement Plan (CIP) Discussion Gayle Bauman, Finance Director Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF 3.F. Assisted Hearing Technology Dave Perrault, City Administrator Documents: MEMO.PDF ATTACHMENT A.PDF 3.G. TCAAP Public Engagement Dave Perrault, City Administrator Documents: MEMO.PDF ATTACHMENT A.PDF 3.H. Council Tracker Dave Perrault, City Administrator Documents: MEMO.PDF 4. COUNCIL/STAFF COMMENTS ADJOURN AGENDA ITEM — 3A ,AI�EN HILLS MEMORANDUM DATE: July 17, 2023 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Mark Kelliher — PTRC member SUBJECT: Proposed Buckthorn Removal within Chatham Trails Park Budgeted Amount: Actual Amount: Funding Source: $0 $4,500 Park Maintenance — General Fund Council Should Consider Council should consider the presentation from PTRC member, Mark Kelliher, related to proposed buckthorn removal within Chatham Trails Park. Background/Discussion Attachment A describes the proposed project background and shows the project (three pages of the same geographical area around the swamp). The purpose of this item is to discuss with City Council the proposed project and requesting $4,500 to cover the goat -grazing and the grass seed to remediate this specific area of Chatham Trails (7.2 acres total). If we wait until the next grant cycle using Great River Greening as an intermediary, there will be a two-year hiatus and the buckthorn will resurge into the area that we have worked. Thus, I believe it is important to keep the momentum going from what Bob, Steve, and I have already accomplished and not lose ground to the buckthorn's inevitable resurgence. The rest of Chatham Trails can be addressed later using grant monies, with Great River Greening's help. Budget Impact The $4,500 is not specifically budgeted for in the 2023 Budget but there should be sufficient funds to cover the cost. Attachments Attachment A — Project Background and Proposal from Mark Kelliher Attachment B — Presentation Slides Page 1 of 1 Attachment A Interim Buckthorn Management Solution To: PTRC Com m ttee From: Mark Kelliher, Member PTRC Date: June 20, 2023 Proposal: Hire the goat herding company known as We Got Chew to bring in a herd of 25-30 of its goats for browsing an area of —7.2 acres in the Chatham Trails Area. Cost of project estimated to be $4,500. Background: Using Great River Greening as an intermediary, the City has applied for grant monies from the Minnesota Legacy Fund to remediate Floral and Hazelnut Parks. Any grant awards made will not become available until June or July of 2024, and will only be applicable to those two parks. On a related note, in tandem with the goal of remediating our parks, considerable work has been underway by an intrepid team of volunteers in the Chatham Trails area in removing mature buckthorn. There are now approximately 7.2 acres where mature buckthorn has been eradicated or mitigated. With the removal of the mature buckthorn canopy, the understory is now benefiting from the previously obscured sunlight. Unfortunately, much of the understory is nothing more than just smaller buckthorn trees and shoots. By waiting for the next cycle of Legacy Fund grant monies to address the Chatham Trails area, there is a risk that the buckthorn resurges, as small buckthorn becomes big buckthorn. To mitigate this risk, it is imperative that the momentum from all the accomplished work not be lost. According to Great River Greening, there are two methods for eliminating the smaller residual buckthorn. The first is to use herbicides. The second is to use goats to browse down the growth. Because Chatham Trails surrounds a wetlands which drains into larger aquifiers, using chemical herbicides does not seem advisable. Goats are the answer. Great River Greening suggests an August or September goat grazing for optimal results. Because of the interim time period that exists before the Legacy grant monies arrive next June for remediating Floral and Hazelnut, my proposal allows us to keep active in the buckthorn battles. Bidding Process: I sketched the approximate areas of Chatham Trails where mature buckthorn has been harvested. Because of the wetlands and the various trails running through the area, I had to break the maps into three parcels, the total of which is —7.2 acres. The Google Maps are below. I sent these maps to the seven vendors with whom I had previously discussed the opportunity. Only two of the seven vendors still have capacity for this season. Of these two firms, We Got Chew offers the most competitive pricing and has offered to bring in 25-30 of its goats to work the three parcels. The firm has bid the total project at $3,500, and expects the browsing exercise would take place over the course of two weeks. In addition to the goat herd, I am also budgeting $1,000 for seeding grass and sedge, to be planted at the same time as the goats arrive, thereby benefiting from the goats scratching in the seed as they browse. Later Steps: After the projects at Hazelnut and Floral get firmly underway, we will want to expand our endeavors and begin the process of applying for grant monies to remediate the entire Chatham Trails area, (not just the 7.2 acres now under consideration for this project). When the Chatham Trails area does come into focus, the work done on the 7.2 acres now under consideration will reduce the total amount needed to be requested in that future grant application. Chatham Trails Maps 58,785 square feet translates to 1.35 acres I Total area: 165,214.91 ftz (15,348.97 m2) Total distance: 1,663.08 ft (506.91 m) 165,215 square feet translates to 3.8 acres 7 86,156 square feet translates to 2.0 acres c6 Ln 0 n 0 0 V m U DC r N 00 o040 � ° Z � 7 r r E E C- O +J O u v O O � 4-1 N � O u L v C r6 u N O (6 O O N p L •� � � 0- a) E O E C- E 4-J 4-) O L O L Q Q 0 M 7 E a, O T 4� +� Q) o � U OL O N > O o v Ln E -0 +� v L • Eoocp�2 o0v0a{Y neWcit eeex�r �nn;r•.t .M,�.� O L N i i b.0 m N OP a � O - w o Z 0000.^t.: :COV.N: OOOGO[L OOOE69: OOOOSji �OOW)L Yplll[lL Of Z 0 v c ai 0 V) � 0 @ 0 ƒ � � O E O U 0 r ? r D ? 0 E 9 4 � 0 � _ 3 V) - / ® O O Q � o 3 � .� V) g w O 3 m O 9 � m g � D C O g ? � q 0 0 / 7 > Q U U 3 o � m 3 g 2 � V) ,Ln Ln m g m d .O '� z > � � • � � g � � Ln � U g 2 g g EU Q q � C O n 0 ? Q 'q Ln O Ems_ .� Ln g � � � � � � � � '� un � > C C �D g E �.� �_ m U _g 4-1-0 0 •— E g V) V) 3 p 73 f .� g n D V Q . � 4—� 3 3 D n E o 3 E 3 ® `! LL ? 0 ' ' . . V V Lnrz W O 0 a� a� U N m O to m N O N N U CL N N tv0 -J N C6 cn E CD a--+ f� i U N i v a CD i O N +-j Qj v U N O 0 N a� > •N U X N r6 73 a--+ M E C O z N Q E N N O N U i N O c O a--+ m U Q Q m O Q N N i +.a N a� a1 a,o U AV • • • cn U nC O N E N tiA � C � O � f6 � Q Q1 N c N O L a--+ O E U �A m L- —0 Q `— v O > a) 75 U (o Q) N O txo c6 v v C4-J v �a)> ro- }' U C6 • � i C: O N 4- N N C6 � N N N 4 O E N O N O U U O O m N -0 O cn v u v u M +' o QN c nUl v o N Z3 > Ln N O O N OU 4- O Q N O a0, N }' ate--+ U cn hA +' cn E - C CLO O +=+ N O O ° O cn }, cn — O -0p n N a.J aNLn + a� O m U u 0O O i : N a� 4n m O ++ -y Q O a1 $ `J [6 }' N Ln N 0 Q iJ ate--+ O dJ N �Lf) , U U O -C C: ca O E >; >. u E v i N ° _0 O_ m p (D -0— O — X N U N N p +� OCL) i o O N Z3 an E o N n i a) N O o M o Q an — — n an p N X p O N <'7 w Z) }, i rf U DC iiifi WE Ln m 0 cn N vi N ca+ QO� (, o v 7C3 V) � E � 0)� C C: (o c Qi = () CT -0 N � > a-- O (n (n tL0 N i O U 0 iA 0 0 ' U (n (n N O v� 0) U 0) O E O � N �Dv Q N Z3 }' O t2A O N > 4- (7 E t' v ca ca O ,} Ln > ca qA Q DC Vr U O c� Ur � (a � .• m U � O _O O _� V v � v • , to, w 3 v N � N 2 4-j C N CU X _0 v ao _Q N i O (o a--+ a-1 N U N "}, N o 0 O N > N to bn ' in C = E O U N � > E (D O i O O O +-' U N f� �Q U -0 tin m c Q O.- . . N a- J 4.1 N d) i N 2 4.1 Q -J m U w L71 Q O ate+ •� C U c/) X N j C: O � J 4-j co Q O N N fa U O N LL �+ (f) NO CN (a cc LL O a v •� -p O N O Q N ) � v O C6 E L cu } ca (D — O \ Lto 0- i--j }' O t1A O ♦ / LJ N i .(/) •� N W U O fB U > U 4A N — ca }' +�-+ O o . _0 i (D tO u� oLa a .- ° a •0 O Ul +� E O v O > N O u w � E N 0 4A �, N O O O O N v U v ate-+ - °' ° � � � mN �s� 4�� hA� N i � C O 2 O m U O Q.Ul - � �O N .+--+ E U i cn U U E U H O > �' E Q 4- � ca O U U OA +, � v O N O (U p� }' +-+ U N U cn 5 a-' U a Q t� E v O O ate-+ N O O Q N Q L N N aA :�, N s v — + a- + + U O4te-1 N � G ° '� O �� cn i_� U U O Ln [6 p � N 41J —_ U N f6 OU ate-+ N C- ate--+ tlA CO Ln v U O Q 4A v v co O v 0 V v 0 LO Ul U N Q N t O Co • � m � RITM Q N" O Co N N 0 N .�. ° ^0 W O •- O ro v v) V) O•C: a-j 'LIP Ln O 0 N O L N N a--+ C6 � • bn c6 c O N qA Q N 1 ro Zr v 19 u O O Q- °J Ln E 'cam/ U Ln H rt S L N t C E c ' M o i O u s � 4- 0 4-0s rocu i O u�,; CL a r L O Z5 +-+ i Qi i 4-1 O 4-d s I L 4J Q Q75 p � O v fB N C Z U O o E }+ GJ O E 41 O N °' O V a a N 4-1 CiA O 0 k dA rt S V) U 4-1 } ca b0 ca o v •i U p CA O U i 1 m •� O v a = ate+ • � H O E v co V) O 4� O O U- O N V) D W, C- =3 a--j o 0 cn V_ LL V V) QJ N U Q) .c a-J Q O N +� N 41 > C O C: O v 4-J tlA 4 U c6 O v�i VQJ2NfGi C11 1dLON tU0 � aJ cn N 'F ,N •N X U � a) aJ 7. aL •N yoc}' p4-1U a-+ M a-J U OC ra ro 4-1 N N O 4-J N }' O LL U' 4A O •� }, O L O a� aA N a� v ca �--+ � M N 2 N a-J aJ N U U — N 1 Q) s Q u L � Q � Q ° u O 4—j fu 4—j n� W 0 c 0 V m N o co cD It ry CD a o a a (,-5uijpaas 6) builpaas joi}iui aad gjmoj6 uaoyljonq anilelnwno so • I I c 1 ' i v a s 0 0 N • ++ 0 � T CL 0 0 y+ 0 Q) U , n m V fp Q) C. i 'o spaas OOP jad SBUIlpaas 6Uinining n O (D L C) Q7. m L L Q � • • � � . o v • �n LA O� O � O O O O O spaas aO Lied s6ugpaas 6uinlnjng 0 v _ a 0 a a O V +� U v7 N L N > u O v >. N 0 O O a O O c N � U O � ate--+ >, N N :Lj (U > aA > cn 0 + .— cN i) Ln O C�6 V) Q s an � E O v i O N N cn O i O Ln Q 4' -0 0 D O O C: C o _Z3 U O O O V _0 _ N D a--+ aj Q) un ^�1 n v W r W ��-y L wry V N N z z 1 l0 � rV r dD � Sr N 1WZ 01 anijela.r IuBiau uaoulmanq Ielol v O � O Q) O `v Q) C Z N (1) i U y p _y O N `o U a`r V W —'r 0 r O N L N ti r O N C7 0 N Ln C6 S El • .�fICPr�,"a' NO a � ��''4'u��•. � � ' a .cam' ) � ���! f J J' l aj ae �"�' d G 7 �' 4 1° E t E@ a � as i1 C h0 b C � _ 'a � `,� C �° m o L e L; r9 C u m } m � 4 d m ra E �" `m a" E #'c N a a > c a di m � bn C ��' m m m m m C O y > o n C 12 `a o L - a a a � C m 2 8 } M1 1° C C N �� C a_ C G €_ O w -^ roo rzE rL° m a N= wa tf q t 2 1 � a .� . � ,2 -DO m E E -0 rro O� E.L° a� m m L A m ' 4 a I a d N Ys m w x a a '" `m C U a m r _ } w x m ii E m a in C kin V ` a V CL ¢ a w. a a5 in µ a n� W V / O X � •- 4� a-J bA M C- W O Q C: _0 6m N Y O O O O O a00 O O C v n vi �o C o v ci of N to to M to N to u ca 00 Y 00 l6 H 4! a o 0 0 E j . N o C ^ O Q1 tN 0 N N 1- � to 2 � 7 Y H N � v LL Lr O l0 cy 00 m m N 00 N 1-1 N E c-I L} c-I to M in N t/} c-I {/} O_ LL M C � _ 0 O O O O ON O L V E O O O o0 mO 10 V1 to Ln N 00 O S L N M to V N 00 t/T to L? to in N L 6 L Uao Q _ 3 a � � N v O u a)O O_ v�i O 00 v, O ` 0 i 3 v_ o O N n t/} ± OLOT m 0 0 xIn * + O o O O o 0 o in Ln o O 'E '° E it N Ln M W O 7 O O E Q vi n n n n z z Y v E N C v E o E � O dA fo 3 o v 3 C7 c m a L u "6 L O C ai 00 a E J f9 N C cc% y� Q UJ N ccC }+ _0v 3 v a o o a v > o — v u a v U NUl N V m n3 r N N Y Q H Y a a E a v = E t a, 75 a s o Q U LL 2 AGENDA ITEM — 3B 'It ,-AR�EN HILLS MEMORANDUM DATE: July 17, 2023 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Luke Cardona, Senior Communications Coordinator SUBJECT: State of the City Address Budgeted Amount: Actual Amount: Funding Source: $2,000 TBD EDA Fund Council Should Consider The Mayor and City Council are asked to consider the following matters regarding the State of the City Address. Background Last year the State of the City Address resumed to in -person and was held at the Boston Scientific campus. The prior two years the Address was pre-recorded and then shared online due to the COVID-19 crisis. Per the decision of Council at last month's worksession to hold this year's Address on a Thursday morning in September, Staff contacted both NineNorth and the Tavern Grill to confirm their availability. NineNorth requested to not hold it during the first week in September, but confirmed they are available Thursday, September 14, 21, or 28. The Tavern Grill has also confirmed they are available to host us on any of those dates. They also agreed to honor our 2018 breakfast rate of $5.00 per person. Next steps in this work session is for Council to make decisions on the following items: Discussion • Date: o Thursday, September 14 o Thursday, September 21 o Thursday, September 28 o A different date? • Time: 0 7:30-9 a.m. (30 minutes to check-in/get breakfast and one hour for presentation) o A different time? Page 1 of 2 • Location: o The Tavern Grill o City Hall o Other location? Refreshments: o If held at Tavern Grill they will provide a buffet breakfast for attendees (City billed at $5 per person) o If held at City Hall pastries and juices can be provided • Marketing & Outreach: o Newsletter promotion in July edition (save the date) as well as Aug/Sept edition (if timing allows) o Digital promotion on the City website, social media (including Facebook event), and City TV channel o Postcard mailer to local businesses • Presentation Topics & Presenters: o The presentation will be recorded by NineNorth. They will edit the recording and make it available online for others to watch after the conclusion of the live event. Based on previous topics, suggested topics include: ■ TCAAP Overview and Updates ■ Community and Commercial Development ■ Building Inspections ■ 2023 Infrastructure Projects ■ 2024 Infrastructure Projects ■ Public Safety Updates (Fire and Police) ■ City Finances Overview ■ 2023 City Property Taxes o Council should determine if any additional topics should be included. o Council should determine which member will present on each topic listed above. o Does Council want to include speakers from any outside agencies or groups? Questions & Answers: o How would Council like to receive and answer questions? Live at the end of the presentation Questions received in writing in advance A first draft of the presentation slides will be shared electronically with Council prior to the August work session. Following the August work session, Staff will work directly with the Councilmembers assigned to each topic on their scripts and talking points. The link to last year's State of the City is below for anyone wanting reference the previous format. https://www.youtube.com/watch?v=ol8uPFOki6Q&t=125s Budget Impact The budget for the State of the City is approximately $2,000. Staff estimates the total cost to hold the State of the City Address at the Tavern Grill and have it filmed by NineNorth will cost roughly $1,500. Attachments N/A Page 2 of 2 AGENDA ITEM — 3C 'It ,ARZEN HILLS MEMORANDUM DATE: July 17, 2023 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Jessica Jagoe, Community Development Director Julie Hanson, Assistant to the City Administrator/City Clerk SUBJECT: THC (lower potency) and Adult Use (full strength) Cannabis Discussion Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Council should discuss and provide direction on the draft ordinance for establishing land use definitions and regulations for Lower -Potency Hemp Edible Sales as well as additional comment on Adult Use (full strength) Cannabis sales. Background At the June 20, 2023 Work Session meeting, the City Council directed staff to bring back to the Council ordinance language that would regulate the sales of Lower -Potency Hemp Edibles. Based on that direction, city staff worked with the City Attorney's office to prepare a draft ordinance that incorporates language recommendations from the work session discussion. The proposed ordinance would introduce a new land use classification specific to Lower -Potency Hemp Sales that would establish this as a conditional accessory use only to businesses with a principal Retail Sales and Service land use. This means there cannot be a standalone shop for these products and any business interested in selling Lower -Potency products would need to come before Council and apply for a Conditional Use Permit. As proposed, lower -potency hemp edible sales would be limited to the B-3, Service Business Zoning District (i.e. those businesses along Lexington Avenue south of 694 to the railroad/north of County Road E). By specifying this to a commercial zoning district it would preclude a residential property from being allowed to apply for either a Class I or a Class II Home Occupation. It should be noted that Retail Sales and Service as a principal use is permitted in the B-2, B-3, and B-4 Zoning Districts. Lastly, the draft language includes a separation of lower -potency hemp edible sales to such uses as schools, day cares, residential treatments facilities, and public parks. The City Council should discuss and provide direction on adding language that would also require a separation between Lower - Potency Hemp Edible Sales establishments. Page 1 of 2 Regarding solely the topic of Adult Use Cannabis (full strength products), staff also requests direction on whether or not the City Council would like to consider the option of a moratorium related to Adult Use Cannabis. As mentioned at the June work session, new State law regarding Adult Use Cannabis provides the opportunity for cities to impose a moratorium on the sale of full strength products until January 1, 2025 in order to allow further review and future discussions as the new law continues to be interpreted and the Office of Cannabis Management (OCM) is still taking shape. Currently, Adult Use Cannabis, while legal to possess and consume on private property, does not have a formal licensing process in place by the OCM as far as retail sales go and is a work in progress. Eventually, the OCM will have sample language and forms to provide to cities. Again, the OCM will license retailers but cities will be required to register them and conduct compliance checks. The City Attorney's Office has recommended we wait on any form of registration until the OCM comes out with further guidance. Since licenses cannot be issued by the OCM yet, cities, in turn, cannot register those businesses wanting to sell Adult Use Cannabis products and therefore retail sales are not yet possible. That said, some cities are in the process of or have already adopted moratoriums in order to make any potential businesses fully aware that selling full strength products is prohibited until January 1, 2025. A moratorium also could allow a city ample time to work on its ordinances, creation of any applications or informational forms, and determine how compliance checks will work. While it's expected that the OCM will not have the full process in place until its target date of January 1, 2025, it is possible this could move faster than anticipated. If OCM were to have their processes in place in -advance of 2025 it would allow for the sale of full strength products earlier than anticipated unless a moratorium were in place. Should the Council wish to adopt a moratorium, it could do so through the fully allowed date of January 1, 2025 (and end it earlier than that if it so chooses) or have the moratorium last through a certain date of its choosing prior to January 1, 2025. Please note that a public hearing and notification of such would be required, so the process will take some time, should the Council elect to go this direction. Discussion Staff is looking for direction from the City Council on draft ordinance language for Lower - Potency Hemp Edible Sales as well as direction on pursuing a new moratorium regarding the Adult Use Cannabis (full strength) products. Budget Impact N/A Attachments Attachment A — Draft Ordinance Attachment B — Zoning Map Page 2 of 2 'It -`iRPEN HILLS ORDINANCE NO. 2023- CITY OF ARDEN HILLS RAMSEY COUNTY, MINNESOTA Attachment A AN ORDINANCE AMENDING CHAPTER 13, OF THE ARDEN HILLS CITY CODE CONCERNING THE SALE OF LOWER -POTENCY HEMP EDIBLES THE CITY COUNCIL OF THE CITY OF ARDEN HILLS, MINNESOTA, ORDAINS: SECTION 1. Chapter 13 — Zoning Code, Section 1305 — Rules, Scope, Interpretation, & Definitions, Subsection 1305.04 - Definitions, is hereby amended adding the following underlined definitions: • Hemp Concentrate. The extracts and resins of a hemp plant or hemp plant parts, including when refined to increase the presence of targeted cannabinoids or when intended to be consumed by combustion or vaporization of the product and inhalation of smoke, aerosol, or vapor from the product. • Hemp -Derived Consumer Product. A product intended for human or animal consumption, does not contain cannabis flower or cannabis concentrate, and containing or consisting of hemp plant parts; or containing hemp concentrate or artificially derived cannabinoids in combination with other ingredients. Hemp Plant. All parts of the plant of the genus Cannabis that has a delta-9 tetrahydrocannabinol concentration of no more than 0.3 percent on a dry weight basis. • Lower -Potency Hemp Edible. Any product that (1) is intended to be eaten or consumed as a beverage by humans; (2) contains hemp concentrate or an artificially derived cannabinoid, in combination with food ingredients; (3) is not a drug; (4) consists of servings that contain no more than five milligrams of delta-9 tetrahydrocannabinol, 25 milligrams of cannabidiol, 25 milligrams of cannabigerol, or any combination of those cannabinoids that does not exceed the identified amounts; (5) does not contain more than a combined total of 0.5 milligrams of all other cannabinoids per serving(6) does not contain an artificially derived cannabinoid other than delta- 9 tetrahydrocannabinol; (7) does not contain a cannabinoid derived from cannabis plants or cannabis flower; and (8) is a type of product approved for sale by the Office of Cannabis Management or is substantially similar to a product approved by that Office, including but not limited to products that resemble nonalcoholic beverages, candy, and baked ,goods. Lower -Potency Hemp Edibles includes "edible cannabinoid products" as defined by Minn. Stat. § 151.72. Lower - potency heMp edibles do not include products containing only nonintoxicating cannabinoids. 227oisv2 • Lower -Potency HeMp Edible Sales. The processing or sale of lower -potency hemp edibles or hemp -derived consumer products • Nonintoxicating Cannabinoid. A cannabinoid that when introduced into the human body does not impair the central nervous system and does not impair the human audio, visual, or mental processes. Nonintoxicating cannabinoid includes but is not limited to cannabidiol (CBD) and cannabi - eg rol (CBG) but does not include any artificially derived cannabinoid and must contain less than 0.3% tetrahydrocannabinol (THC). SECTION 2. Chapter 13 — Zoning Code, Section 1320 — District Provisions, Subsection 1320.05 — Land Use Chart, is hereby amended by replacing the chart in its entirety as follows: 1320.05 Land Use Chart. See attached Attachment "A" for the Land Use Chart with the addition of lower -potency hemp edible sales as a Conditional and Accessory Use in the B-3 District. SECTION 3. Chapter 13 — Zoning Code, Section 1325.02 Accessory Uses, is hereby amended by adding a Subdivision 6 as follows: Subd. 6 Lower -Potency HeMp Edible Sales. A. Lower -Potency Hemp Edible Sales shall be a Conditional Accessory use only permitted in the B-3 Service Business District. B. Applicants for Conditional Accessory Lower -Potency Hemp Edible Sales shall follow the conditional use permit procedures prescribed in Section 1355.04, subd. 3, and Appendix A, Procedure Manual. The City shall review a site plan and specifics of the proposed lower -potency hemp edibles business and may issue the permit subject to, but not limited to, the following requirements: 1. Lower -potency hemp edible sales shall only be permitted as an accessory use on a Subject Property where the principal use is Retail Sales & Service, and when such accessory use is clearly incidental to the principal use. 2. The Subject Property shall not be located within 1,000 feet of any school. 3. The Subject Property shall not be located within 500 feet of any property providing day care or residential treatment services, or an attraction within a public park that is regularly used by minors including a playground or athletic field. 4. No lower -potency hemp edible sales shall occur between the hours of 10:00 p.m. and 8:00 a.m. the following du. SECTION 4. This Ordinance shall become effective immediately upon its passage and publication according to law. A Summary of this Ordinance will be published in accordance with state statute. PASSED and ADOPTED this Council of the City of Arden Hills, Minnesota. day of , 2023, by the City 227oisv2 CITY OF ARDEN HILLS David Grant, Mayor ATTEST: Julie Hanson, City Clerk Published in the Pioneer Press on , 2023 aa7oisvz 'It ,ARZEN HILLS MEMORANDUM DATE: July 17, 2023 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Gayle Bauman, Finance Director SUBJECT: 2023 2nd Quarter Financials Budgeted Amount: Actual Amount: N/A N/A Council Should Consider Council should consider discussing the quarterly financial reports. Background AGENDA ITEM — 3D Funding Source: N/A Quarterly, city staff provides the City Council with a budget to actual update. The report includes the General Fund, City -Wide Funds, Investment Portfolio updates and Building Permit data for review. The Council may choose to accept the reports as is or provide further direction. Discussion With the three new council members, Council Member Monson requested that this item be placed on a work session prior to the council meeting for a more in depth discussion. Budget Impact None. Attachments Attachment A: Investment Portfolio Analysis Attachment B: General Fund Revenues and Expenditures Summary Attachment C: Other City Funds Revenues and Expenditures Summary Attachment D: Permit Data Page 1 of 1 SCHEDULOEFOF RWE HILLS Attachment A FOR THE MONTH ENDING JUNE 30, 2023 Unadjusted Market Value Deposits - Expenditures - Market Value Market Value Unrealized Institution Description Type 1/1/2023 Purchases Maturities Transfers Interest 6/30/2023 6/30/2023 gain / loss Wells Fargo - Adv Wells Fargo Advisors Money Market $ 5,259.28 $ - $ 2,588.02 $ 7,847.30--�,847.30 $ - Wells Fargo - Adv FHLB Municipal Securities 217,699.65 - - 217,699.65 218,738.45 1,039.80 Wells Fargo - Adv FHLB Municipal Securities 410,044.00 - - 410,044.00 416,332.20 6,288.20 633,002.93 2,588.02 635,590.95 642,917.95 7,327.00 RBC RBC Money Market - - (145,812.32) - 145,812.32 - - - RBC US Treasury Note Municipal Securities 250,000.00 - (250,000.00) - - - - - RBC US Treasury Note Municipal Securities 247,440.00 - (250,000.00) - - (2,560.00) - 2,560.00 RBC Citibank Nat'l Assoc Brokered CD 245,131.62 - (246,000.00) - - (868.38) - 868.38 RBC Veritex Community Bk NA Brokered CD 249,000.00 - (249,000.00) - - - - - RBC US Treasury Note Municipal Securities 247,382.50 - (250,000.00) - - (2,617.50) - 2,617.50 RBC Capital One Nod Assn McLean VA Brokered CD 99,351.00 - (100,000.00) - - (649.00) - 649.00 RBC Bank of the Westlnstl Brokered CD 98,820.00 - (100,000.00) - - (1,180.00) - 1,180.00 RBC Meridian Corp Brokered CD 242,000.00 - - - - 242,000.00 242,000.00 - RBC Charles Schwab Brokered CD 238,000.00 - - - - 238,000.00 238,000.00 - RBC Morgan Stanley Private Bank Brokered CD 240,787.95 - - - - 240,787.95 243,235.72 2,447.77 RBC Prescott Wis Sch Dist Municipal Securities 224,765.75 - - - - 224,765.75 227,618.65 2,852.90 RBC American Express Brokered CD 236,581.80 - - - - 236,581.80 238,928.90 2,347.10 RBC State of Connecticut Municipal Securities 354,075.00 - - - - 354,075.00 360,266.25 6,191.25 RBC Capital One Bk USA Brokered CD 97,359.00 - - - - 97,359.00 97,581.00 222.00 RBC Bank Hapolim Brokered CD - 244,000.00 - - - 244,000.00 241,825.96 (2,174.04) RBC Sallie Mae Bk Brokered CD 240,259.25 - - - - 240,259.25 239,502.20 (757.05) RBC Morgan Stanley Bk NA Brokered CD 144,435.00 - - - - 144,435.00 144,780.00 345.00 RBC Enerbank USA UT Brokered CD 237,160.05 - - - - 237,160.05 237,598.29_ 438.24 RBC State of Mississippi Municipal Securities 388,068.00 - - - - 388,068.00 386,340.00 1,728.00) RBC New Jersy St Econ Dev Municipal Securities 314,282.50 - - - - 314,282.50 319,704.00 ,421.50 RBC FFCB Municipal Securities 273,558.00 - - - - 273,558.00 277,452.00 3,894.00 RBC FHLB Municipal Securities 367,648.00 - - - - 367,648.00 371,380.00 �,732.00 RBC San Marcos Tex Cons Municipal Securities 221,615.00 - - - - 221,615.00 224,545.00 2,930.00 RBC Gladewater Cary Line Ind TX Municipal Securities 220,250.00 - - - - 220,250.00 223,330.00 3,080.00 RBC Yucaipa VY Calif Municipal Securities 185,874.00 - - - - 185,874.00 186,408.00 534.00 RBC New York City NY Transit Municipal Securities 370,332.00 - - - - 370,332.00 374,096.00 3,764.00 RBC Park Creek Cc Met Dist CO Municipal Securities 282,531.00 - - - - 282,531.00 282,354.00 (177.00) RBC Palm Beach Fla Rev Municipal Securities 366,471.30 - - - - 366,471.30 367,235.70 _ 764.40 RBC FHLB Municipal Securities 279,582.00 - - - - 279,582.00 283,107.00 3,525.00 RBC City National Bank Brokered CD - 244,000.00 - - - 244,000.00 237,865.84 (6,134.16) RBC WEALTH Michigan City ISD Municipal Securities 249,752.50 - - - - 249,752.50 249,927.50 175.00 RBC FFCB Municipal Securities 347,609.50 - - - - 347,609.50 344,351.00' (3,258.50) RBC Skokie IL Municipal Securities 256,409.30 - - - - 256,409.30 259,512.30 3,103.00 RBC WEALTH Hawaii St GO Bds Municipal Securities 359,800.00 - - - - 359,800.00 357,973.00' (1,827.00) RBC FHLB Municipal Securities 386,680.00 - - - - 386,680.00 390,020.00 3,340.00 RBC FFCB Municipal Securities 259,932.00 - - - - 259,932.00 265,170.00 5,238.00 RBC FHLB Municipal Securities 288,534.00 - - - - 288,534.00 290,556.00 2,022.00 RBC MHFA Municipal Securities 207,315.10 - - - - 207,315.10 207,142.60 (172.50) RBC New York, NY Municipal Securities 339,528.00 - - - - 339,528.00 346,644.00 7,116.00 RBC Vista Calif Uni Sch Dist Municipal Securities 256,215.00 - - - - 256,215.00 261,570.00 5,355.00 RBC San Francisco CA Municipal Securities 300,118.00 - - - - 300,118.00 304,034.50 3,916.50 RBC Elk Grove Village IL Municipal Securities 256,074.00 - - - - 256,074.00 261,135.00 5,061.00 RBC Kane McHenry Cook & Dekalb Municipal Securities 329,997.50 - - - - 329,997.50 333,140.50 3,143.00 RBC City of Milwaukee WI Municipal Securities - 399,992.00 - - - 399,992.00 390,052.00 (9,940.00) RBC City of Minneapolis MN Municipal Securities 340,777.50 - - - - 340,777.50 341,120.50 343.00 RBC Washington Cry OR SD#48J Municipal Securities 306,253.65 - - - - 306,253.65 311,747.65 5,494.00 RBC San Diego CA Comm College Municipal Securities 309,550.50 - - - - 309,550.50 318,048.50 8,498.00 RBC Live Oak Banking Co Wilmington' Brokered CD 237,969.30 - - - - 237,969.30 231,699.48 (6,269.82) RBC Cook County IL Sch Dist Municipal Securities 133,155.40 - - - - 133,155.40 134,621.20 1,465.80 RBC -Pelican Rapids MN Municipal Securities 402,486.00 - - - - 402,486.00 412,624.10 10,138.10 RBC Shakopee MN ISO 720 Municipal Securities - 216,993.92 - - - 216,993.92 207,440.00 (9,553.92) RBC City of Dallas TX ---- Wunicipal Securities - 309,000.00 - - - 309,000.00 300,464.00 (8,536.00) RBC State of Minnesota Municipal Securities - 333,145.80 - - - 333,145.80 320,973.90 (12,171.90) RBC City of Duluth, MN IMunicipal Securities - 384,671.11 - - - 384,671.11 371,732.00 (12,939.11) 12,530,917.97 2,131,802.83 (1,590,812.32) 145,812.32 13,217,720.80 13,256,854.24 39,133.44 Money Market - - - - - - - - PMA 4MGeneral Money Market 1,677,206.18 7,950,431.65 (8,232,311.32) 364,314.00 21,670.31 1,781,310.82 1,781,310.82 (0.00) PMA 4MPGeneral Money Market 1,663,642.42 100,000.00 36,674.32 1,800,316.74 1,800,316.74 PMA 4M Payroll Money Market 0.00 732,513.17 732,515.58 - 2.41 0.00 (0.00) (0.00 PMA ARPA Funds _.ylunicipalSecurities 609,164.18 (464,314.00) 9,313.69 154,163.8jb 154,163.87 PMA Term Series (xxx days) Municipal Securities 250,000.00 250,000.00 5,329.11 5,329.11 - - PMA Term Series (xxx daysL_j�icipal Securities 500,000.00 - 500,000JJJJ§h,QQ,000.00 PMA Term Series (xxx days) Municipal Securities 250,000.00 - - - - 250,000.00 250,000.00 - 4,950,012.78 8,682,944.82 (9,214,826.90) (5,329.11) 72,989.84 4,485,791.43 4,485,791.43 (0.00) Total cash and investments $18,113,933.68 $10,814,747.65 $(10,805,639.22) $ (5,329.11) $221,390.18 $18,339,103.18 $18,385,563.62 $ 46,460.44 U N U p N � 00 \O O � N M O 0� opo 00 6 cY C CA CA 00 69 Ff3 M oo O CA 0� 7 r enO M M N CD U O N y "o M "C N � 06�i N N "C Q M N � 00 r- N� O � 00 OHO M 00 N '�' c 69 69 In O O In O 00 "O 00 In 00 Cn \O aU+ ; N \c �c V�'1 N M 00 O 00 "D 'n M l� M N M l-N 00 M N N N , 69 1� 00 II 00 69 O O O O O O 6A O O O O O O O O O O O O O O O O O O 69 69 69 69 69 69 v I M >1 00 M M �O 0000 Cn O 0000 M N .Nr I 00 69 69 Attachment B CITY OF ARDEN HILLS STATEMENT OF REVENUES AND EXPENDITURES GENERALFUND FOR THE SIX MONTHS ENDED JUNE 30 2023 2022 % of % of Budget YTD Budget Budget YTD Budget REVENUES $ 4,078,390 $ 1,693,756 41.5% Taxes $ 3,858,370 $ 1,785,330 46.3% 511,730 259,388 50.7% Licenses and permits 504,800 504,675 100.0% 171,370 53,178 31.0% Intergovernmental 158,250 54,757 34.6% 525,550 215,392 41.0% Charges for services 519,510 337,490 65.0% 23,190 11,154 48.1% Fines and forfeits 23,750 7,595 32.0% 3,350 - 0.0% Special assessments 1,510 - 0.0% 42,500 35,193 82.8% Investment earnings 19,500 12,930 66.3% 13,340 3,317 24.9% scellaneous 14,560 6,486 44.5% 5,369,420 2,271,378 42.3% TOTAL REVENUES 5,100,250 2,709,264 53.1% EXPENDITURES 73,510 44,443 60.5% yor & Council 55,070 24,073 43.7% 434,230 219,216 50.5% Administration 402,450 195,023 48.5% 33,200 24,197 72.9% Elections 32,350 18,888 58.4% 191,550 120,707 63.0% Finance 184,220 104,973 57.0% 90,450 29,787 32.9% TCAAP 87,260 23,347 26.8% 281,080 96,949 34.5% Planning & Zoning 242,010 92,704 38.3% 223,910 105,430 47.1% Government Buildings 203,840 97,609 47.9% 1,453,280 725,980 50.0% Public Safety 1,396,130 698,501 50.0% 68,740 22,912 33.3% Dispatch 61,810 25,753 41.7% 751,180 375,589 50.0% Fire Protection 696,670 348,337 50.0% 6,830 3,004 44.0% Emergency Management 6,200 3,190 51.4% 375,770 180,998 48.2% Protective Inspections 349,860 146,376 41.8% 799,080 291,171 36.4% Street Maintenance 936,320 219,228 23.4% 237,770 73,218 30.8% Recreation 234,740 85,659 36.5% 545,590 246,564 45.2% Park Maintenance 529,240 237,281 44.8% - - N/A Transfers Out 102,540 - 0.0% 5,566,170 2,560,165 46.0% TOTAL EXPENDITURES 5,520,710 2,320,943 42.0% $ (196,750) $ (288,787) 146.8% NET CHANGE IN FUND BALANCE $ (420,460) $ 388,321 -92.4% 50.0% Percentage of Year Complete 50.0% Tax revenues are collected twice a year. Licenses & Permits and Charges for Services are down from 2022 because no big projects have moved forward this year. Expenditures - wages are up due to COLA and insurance increases. Also, some allocation changes were made in 2023. Mayor & Council - additional training costs in 2023 and added back NYFS contract. Administration - property insurance costs are up in 2023. Elections - timing difference with quarterly billing. Finance - new laptop in 2023 and credit card fees are up. TCAAP - more activity in 2023. Planning & Zoning - promotion for CD Director in 2022. Government Buildings - PW facility rental costs are now being charged monthly instead of semi annually Protective Inspections - payments to electrical inspector are up in 2023, based on permits issued. Street Maintenance - overtime, salt & sand and central garage charges are up, partly due to plowing. Park Maintenance - additional costs for dog park at Perry. Miscellaneous Investment earnings Special assessments Fines and forfeits Charges for services Intergovernmental Licenses and permits Taxes General Fund Revenues $ $50 $100 $150 ■ 2022 ■ 2023 General Fund Expenditures Transfers Out Park Maintenance Recreation Street Maintenance Protective Inspections Emergency Management I Fire Protection Dispatch Public Safety Government Buildings Planning & Zoning TCAAP M Finance Elections M Administration Mayor & Council L $- $100 $400 $500 ■ 2022 - 2, Total approved impacts to date on future levies: Communications Coordinator 41,000 0.87% NYFS Agreement 23,000 0.49% $200 $250 Thousands $600 $700 $800 Thousands Attachment C CITY OF ARDEN HILLS OTHER GOVERNMENTAL FUNDS BUDGET SUMMARY FOR THE SIX MONTHS ENDED JUNE 30 2023 % of Budget YTD Budget 2022 % of Budget YTD Budget CABLE TV 56,635 56,635 Beg Fund Balance 90,743 90,743 94,500 23,965 25.4% Revenues 98,840 23,842 24.1% 142,760 56,164 39.3% Expenditures 129,810 56,762 43.7% 8,375 24,436 End Fund Balance 59,773 57,822 Cable TV franchise revenues are receipted quarterly in the month following the end of the quarter, EDA GENERAL 662,514 662,514 Beg Fund Balance 100,000 21,315 21.3% Revenues 87,550 40,976 46.8% Expenditures 674,964 642,853 End Fund Balance EDA tax revenues are collected twice a year TIF FUNDS 1,342,914 1,342,914 Beg Fund Balance - 11,632 N/A Revenues 5,700 - 0.0% Expenditures 1,337,214 1,354,547 End Fund Balance The TIF note for TIF #4 Presbyterian Homes has been paid in full. 245,914 245,914 390,000 13,682 441,520 57,509 EQUIP & BUILDING CAPITAL Beg Fund Balance 3.5% Revenues 13.0% Expenditures 657,906 657,906 102,850 5,562 5.4% 87,270 36,379 41.7% 673,486 627,089 1,107, 510 1,107, 510 382,280 3,531 0.9% 288,580 - 0.0% 1,201,210 1,111,041 261,892 261,892 379,000 26,174 6.9% 433,860 53,764 12.4% 194,394 202,087 End Fund Balance 207,032 234,302 Transfers in to the Equipment & Building fund are normally completed during the 4th quarter. PARK DEVELOPMENT 218,039 218,039 Beg Fund Balance 565,168 565,168 - 6,991 N/A Revenues 12,460 13,282 106.6% - - N/A Expenditures 399,377 2,122 0.5% 218,039 225,030 End Fund Balance 178,251 576,328 PIR FUND 4,702,027 4,702,027 Beg Fund Balance 4,990,123 4,990,123 1,872,210 373,767 20.0% Revenues 1,594,710 273,458 17.1% 2,195,700 264,889 12.1% Expenditures 2,495,510 564,394 22.6% 4,378,537 4,810,906 End Fund Balance 4,089,323 4,699,187 Revenue includes final Bethel trail contribution ($150,000) and CDBG funds for Arden Manor Park ($177,378) FIRE EQUIP CAPITAL 264,303 264,303 Beg Fund Balance 173,067 173,067 245,000 11,445 4.7% Revenues 200,550 14,381 7.2% 178,200 4,262 2.4% Expenditures 91,700 (429) -0.5% 331,103 271,486 End Fund Balance 281,917 187,877 50.0% Percentage of Year Complete 50.0% 50.0% Percentage of Year Complete 50.0% REVENUES User charges Connection charges Other Interest earnings TOTALREVENUES EXPENSES Personnel expenses Supplies and materials Other services and charges Water purchases Depreciation Capital expenses Debt service TOTAL EXPENSES Bond Proceeds Transfers out EXCESS (DEFICIT) REVENUES OVER EXPENSES CITY OF ARDEN HILLS, MINNESOTA STATEMENT OF REVENUES AND EXPENSES BUDGET AND ACTUAL FOR THE SIX MONTHS ENDED JUNE 30 WATER FUND Percent Received or Expended Actual Actual Variance - Based on Annual Thru Thru Favorable Actuals Thru Budget 06/30/22 06/30/23 (Unfavorable) 06/30/23 $ 2,706,920 $ 516,605 $ 569,051 $ 52,446 13,750 3,605 2,230 (1,375) 702,240 25,811 16,145 (9,666) - 9,772 24,220 14,448 3,422,910 555,793 611,646 55,853 406,710 173,045 182,708 (9,663) 53,000 23,471 13,851 9,620 338,180 111,508 179,359 (67,851) 1,198,380 204,581 245,618 (41,036) 363,880 - - - 185,000 - 168 (168) 248,050 222,275 223,475 (1,200) 2,793,200 734,881 845,178 (110,298) 100,000 $ 529,710 $ (179,088) $ (233,532) $ (54,445) 110.2 61.9 62.6 247.8 110.0 105.6 59.0 160.8 120.1 N/A N/A 100.5 N/A N/A Water Sales Comparison $3.00 c 0 $2.50 $2.00 $1.50 0z $1.00 $0.50 Q1 Q2 Q3 Q4 -2021 - 490,227.97 1,243,040.31 2,747,032.72 -2022 1,609.48 516,604.60 1,174,144.35 2,762,395.33 -2023 939.28 569,050.97 CITY OF ARDEN HILLS, MINNESOTA STATEMENT OF REVENUES AND EXPENSES BUDGET AND ACTUAL FOR THE SIX MONTHS ENDED JUNE 30 SEWER FUND Percent Received or Expended Actual Actual Variance - Based on Annual Thru Thru Favorable Actuals Thru Budget 06/30/22 06/30/23 (Unfavorable) 06/30/23 REVENUES User charges $ 2,272,980 $ 544,045 $ 599,128 $ 55,083 110.1 % Connection charges 8,250 2,490 4,140 1,650 166.3 Other 6,910 2,214 1,780 (434) 80.4 Interest earnings - 3,141 10,562 7,421 336.3 TOTAL REVENUES 2,288,140 551,890 615,610 63,720 111.5 EXPENSES Personnel expenses 479,200 207,438 218,803 (11,365) 105.5 Supplies and materials 16,500 9,175 14,790 (5,615) 161.2 Other services and charges 310,370 158,176 134,257 23,919 84.9 Wastewater charges 845,370 476,688 422,684 54,003 88.7 Depreciation 198,440 - - - N/A Capital expenses 842,000 204,681 5,311 199,370 2.6 Debt service 38,250 35,025 34,425 600 98.3 TOTAL EXPENSES 2,730,130 1,091,182 830,271 260,911 76.1 Bond Proceeds - - - - N/A Transfers out 126,000 - N/A EXCESS (DEFICIT) REVENUES OVER EXPENSES $ (567,990) $ (539,292) $ (214,661) $ 324,632 39.8 % $2.50 Sewer Sales Comparison o � $2.00 i I $1.50 $1.00 $0.50 $- Q1 Q2 Q3 Q4 171.53 518,240.72 1,050,881.97 2,104,021.86 5--2021 2022 702.30 544,045.08 1,092,286.43 2,203,72023 1,043.75 599,128.48 CITY OF ARDEN HILLS, MINNESOTA STATEMENT OF REVENUES AND EXPENSES BUDGET AND ACTUAL FOR THE SIX MONTHS ENDED JUNE 30 SURFACE WATER MANAGEMENT FUND Percent Received or Expended Actual Actual Variance - Based on Annual Thru Thru Favorable Actuals Thru Budget 06/30/22 06/30/23 (Unfavorable) 06/30/23 REVENUES User charges $ 953,770 $ 236,370 $ 235,488 $ (881) 99.6 % Other - - 17,414 17,414 N/A Interest earnings - 1,279 5,607 4,328 438.5 TOTAL REVENUES 953,770 237,648 258,509 20,861 108.8 EXPENSES Personnel expenses 323,750 122,117 148,402 (26,285) 121.5 Supplies and materials 15,000 1,445 9,457 (8,013) 654.7 Other services and charges 254,680 51,389 53,666 (2,278) 104.4 Depreciation 151,560 - - - N/A Capital expenses 180,000 2,960 3,038 (79) 102.7 TOTAL EXPENSES 924,990 177,910 214,564 (36,654) 120.6 Transfers out 74,000 - - N/A EXCESS (DEFICIT) REVENUES OVER EXPENSES $ (45,220) $ 59,738 $ 43,945 $ (15,793) 73.6 % Attachment D CITY OF ARDEN HILLS, MINNESOTA PERMIT DATA FOR BUILDING, HVAC AND PLUMBING FROM PERMITWORKS SOFTWARE FOR THE SIX MONTHS ENDED JUNE 30 6/30/2022 6/30/2023 Building Permit Issued 171 217 Building Permit Fees 250,122 114,491 Building Plan Review Fees 138,705 29,900 TOTAL BUILDING FEES 388,826 144,391 Valuations of Projects 41,024,271 9,884,390 HVAC Permits Issued 131 123 HVAC Permit Fees 107,411 3S,SS4 HVAC Plan Review Fees 118 - TOTAL HVAC FEES 107,528 35,554 Valuation of Projects 7,980,682 2,235,410 Plumbing Permits Issued 92 86 Plumbing Permit Fees 22,813 11,484 Plumbing Plan Review Fees - - TOTAL PLUMBING FEES 22,813 11,484 Valuation of Projects 1,583,499 697,998 TOTAL PERMITS ISSUED 394 426 TOTAL PERMIT FEES 519,168 191,429 TOTAL VALUATION OF PROJECTS 50,588,453 12,817,798 'It ,ARZEN HILLS MEMORANDUM DATE: July 17, 2023 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Gayle Bauman, Finance Director SUBJECT: 2024 — 2028 Capital Improvement Plan (CIP) Budgeted Amount: Actual Amount: N/A N/A Council Should Consider Provide feedback to staff on Preliminary 2024 — 2028 CIP Plan. Background AGENDA ITEM — 3E Funding Source: Various Annually, the City prepares a five (5) year Capital Improvement Plan for budgeting and forecasting. The focus of the CIP is on the maintenance and protection of the City's existing assets, redevelopment, and investment in new initiatives. The CIP is part of the budget process, but it is not a budget, it is a plan, and one that changes often. The CIP does not commit the council to the proposed projects, nor implement the assumptions made during the preparation; however, this is the basis for the 2024 Budget as we continue with its preparation. The city has a finite amount of resources, so prioritizing and then being able to finance projects is crucial for ensuring the city's long-term sustainability and being responsible stewards of the city's investments. Staff has been working on completing a comprehensive study of the City's current and future needs for infrastructure projects to better estimate project costs and ensure more accurate forecasting of available fund balances. Discussion A preliminary plan has been prepared and is attached which includes a summary of projects, detailed project sheets, sources of funds, and estimated fund balances (since the operating budgets have not yet been completed, these fund balances are estimated operating costs). Information is included on street and park projects going out ten (10) years even though our CIP is only for five years. Please note that project timelines are subject to change and that the current timeline is City Staff s best estimate. The 2023-2027 CIP was a $17.4 Million plan, while the proposed 2024-2028 CIP is listed for $27.5 Million in expenditures. This is a 58.2% increase from the previous year's program or $10,129,750. The biggest increases are in Parks, Street Projects and Equipment purchases while the biggest Page 1 of 4 decrease is found in Surface Water as a majority of these projects were absorbed into the Street Projects. PIR Fund • The city has about $60 million of streets and trails (based on 29.42 miles of city streets). Estimating the useful life of these assets at 40 years would require an investment of about $1.5 million annually. The current funding sources of the tax levy, Municipal State Aid and special assessments account for about $920,000 on average per year for 2024-2028. This gap in the CIP fluctuates from year-to-year, but will need to be addressed over time. • A property tax levy of $250,000 is being proposed for 2024, which is unchanged from 2023. Based on potential projects, this amount should be increased. • The city has been able to self -finance the special assessment portion thus far. However, with the cost of these projects increasing, we may need to eventually look at bonding for the special assessment portion of street projects. Current projections do not include any prepayments of special assessments. • There are not sufficient MSA funds to cover the projects included in the CIP for the next 10 years. Based on current projections, our MSA fund will be short by $2.57 million at the end of 2033 and won't be positive again until 2042. • The Lake Johanna Blvd trail project and 2028 PMP were added to the CIP. • There is a definite need to stay on top of street improvement projects to ensure streets reach their useful lives and don't require costly premature full reconstructions. Several areas of the city are reaching those crucial ages that significant outlay is needed to ensure the long-term vitality of the streets. • Projects were programmed to try and get the City on a schedule of completing a major street reconstruction project every other year. • The 3 types of street improvement projects being considered based on condition are: o Resurfacing is the milling of the top 1.5 to 2 inch surface layer of street pavement and overlaying the street with a new bituminous surface layer. o Full Depth Reclamation involves spot repair of existing curb, milling or reclaiming the full depth of existing bituminous pavement, blending milled material with underlying aggregate material and installing a new bituminous pavement section. o Reconstruction involves removal and replacement of larger quantities of existing curb, installing underlying subgrade correction materials, new aggregate base and a new bituminous pavement section. • Future PMP projects included in the CIP (2025 and beyond) assume Full Depth Reclamation will be required. Costs will decrease if Resurfacing is required and increase if Reconstruction is required. Public Safety Capital Equipment Fund • The fund is currently being used to account for capital expenditures made by the Lake Johanna Fire Department. • The assumption being used for this CIP is that debt service on the new fire station will begin in 2026 at $140,300 and increase to $280,600 in 2027 per year. • Engine/ladder truck replacements are scheduled for 2024, 2027 and 2029. • The current $220,000 tax levy does not support the needs of this fund. Could possibly apply a portion of the one-time Public Safety Aid being allocated to the City to assist with the fund deficit. Page 2 of 4 Equipment & Building Replacement Fund • The current plan includes replacing the City Hall roof in 2025 and replacing the City Hall air handlers in 2028. • PW staff has been working on the long-term asset replacement plan for equipment. Because of this, $683,500 of new or replacement equipment was added to the plan through 2027 and $174,000 was added for 2028. • The current $50,000 tax levy does not support the needs of this fund. Utility Funds • Public Works staff continues to evaluate the condition of City utilities throughout the community. The majority of street projects currently include a minimum amount for isolated utility repairs but these amounts could increase as locations are identified where broader water, sanitary sewer and drainage replacement is needed. • For the Sewer Fund, no I&I grant funds have been included in the plan as the amounts are unpredictable. Rate increase assumptions are as follows: ■ Water — 2024-2033 (0%) — possibly look at rate reduction in a future year ■ Sewer — 2024-2026 (2%); 2027-2033 (0%) ■ Storm— 2024-2033 (1 %) Council Direction Staff is seeking direction from the City Council regarding the following items: 2024 projects As we review the 2024 projects, does the Council have any questions, comments or concerns about including them during budget preparation? 2024 property tax levy The levies for the EDA ($100,000), Equipment/Building Replacement ($50,000), Public Safety Capital ($220,000) and PIR ($250,000) are currently proposed to remain at the same amount as was levied in 2023 in this plan. Levy increases are needed for the Equipment/Building Replacement and Public Safety Capital funds. What increases, if any, should staff assume? 2023 General Fund transfer There is $253,640 available to transfer from the General Fund to capital funds in 2023. This total represents the amount at 12/31/2022 that was in excess of the 50% fund balance reserve goal stated in the City's financial policies less the amount needed to be reserved due to additional costs being incurred for the Communications Coordinator position and the NYFS contract. There are some one time operational expenditures included in the 2024 Budget ($40,000 for ordinance updates and $17,500 for a comp study). A portion of these funds could be used to cover those costs so they are not included when calculating the needed levy increase. The 2023 Street Maintenance budget will also need additional funds due to overages in the salt/sand and overtime line items due to winter plowing. Does the Council have a preference on where the funds should go? 2024 Local Government Aid (LGA) The omnibus tax bill includes an $80 million annual increase in local government aid. Arden Hills is not currently a recipient of LGA Funds. This increase would mean Arden Hills will Page 3 of 4 receive $121,471 of LGA in 2024. Staff recommends that these funds are not used for general operations (the state has unallotted LGA in the past) but instead direct them toward capital projects. They are included in the PIR Fund in this plan. Does the Council have a preference on where the funds should go? Public Safety Aid The City is being allocated one-time Public Safety Aid in the amount of $433,084. These funds can only be used to cover police and fire expenditures. How does the Council want to allocate these funds? Additional Funding Mechanisms There are additional funding mechanisms available to cities to take some of the burden off of the property tax levy. Options such as Franchise Fees and Local Sales Taxes can bring in monies from exempt properties and non -property owners. During the 2023 legislative session, a moratorium was placed on local sales tax authorizations through the 2025 legislative session. Does the Council want staff to begin exploring additional funding mechanisms such as Franchise Fees or Local Sales Tax? Budget Impact The Council should review the estimated fund balances and funding sources with special attention given to the Equipment/Building Replacement and Public Safety Capital Funds. When considering what tax levy increases are needed to support the capital funds, it should be noted that preliminary results of department submissions and other assumptions have the General Fund expenditures increasing by $693,840, which would equate to a 14.7% levy increase. This is without taking into account any changes to the revenue budget from 2023. Attachment C gives a preliminary snapshot of the increases being considered for the General Fund. Attachments Attachment A: PowerPoint Overview of Capital Improvement Plan Attachment B: Capital Improvement Plan Attachment C: Preliminary expenditure increases for 2024 General Fund Budget Page 4 of 4 Arden Hills Equipment Replacement Guidelines 3 Year Cycle Zero Turn Mowers 5-7 Year Cycle Weed Trimmers, Push Type Lawn Mowers, Walk behind Snow Blower, handheld blower, Toolcat 8-10 Year Cycle Pick-up Trucks, Power Hedge Trimmer, Back Pack Blowers, Power Pole Pruner, Large Area Mower 10-12 Year Cycle 1-Ton Dump Trucks, City Hall Vehicles, Asphalt Hot Box, Large Dump Truck 13-15 Year Cycle Skid Steer, J Tamper, Plate Compactor, Chain Saws, Chop Saws, Cement Mixer, Turf Utility Carts, Small Generators 15-17 Year Cycle Street Sweeper, Tanker Truck, Asphalt Roller, Backhoe, Misc. Pumps, Sewer Camera Trailer, Brush Chipper, Trailers 18-20 Year Cycle Pavement Saw, Large Air Compressor, Trench Box 20-22 Year Cycle Sewer Jetter-Vac Combo, Mini Ex 20-25 Year Cycle Front End Loader, Sewer Easement Machine, Aerator 25+ Year Cycle Large Generators, Turf Sweeper ro CL 4-j N E O L^ �..L E ro a••+ .0L C6 U O L ro E E D N • M O Ln O M O O 00 O n N O OLn M O M N N .. O 00� O O O� I� O o 0 O 00� o O O N Ln c-I L n Q M O N L n M 00 lC CD 0 O 0 O On 0 O � m Q00 lD � u1 0 O 0 m O O 0 o O� rl 0 0 00 O W L Ln ry . 0 O O 0 Ln 0 000 T 0 O L6 O N � N ao M 0 0 r-I N 0 0 0 r, Ni, 0 rn N M 0 o -I QO 0 0 0 0�� 0 r- lfl 0 o • 0 ' 0 I� N • 0 0 0 O O 0 Ln I- O O o O u1 O o 0� l f) r O cn Ci 0 L-nr,4 rn O u1 � d) N N r-j U) M l0 E o QJ E O C w b �_ CO L � i 4-1W Y Q • - a E i N � N E i N ate-+ � Q N U N 4-1 E i N a -� W O a--+ v �E U L O N a-j N u O N O N � v L 2 � � v Q X O U O O N �: v O L a-J O N a-J U N O � L CL '0 O O OM N 00 ro r-I QMl �° O .r—I `n 0 r- rri O O O 4 O 00 m OOOOOpOO � Q) N r-I p _ O M O �M 10 O OOO �i� n O I� D 0M N O N O � 00 O 0 O � N 0 M lDtC o ry cm N Ln N O M O o O O � M O m � O 0 m O 0 � O 0 om O O O O to 00 00 N M p O E O c O w w = E i O > 0 E Q C) E i Q 4--1 a m Ln v — a C4-1 N 0 N aJ N aJ E 0 a) ateJ N Q v M cn O O � O E Q N a- Lu � H N � v N � 0 J � v N U 0 U N O N }' O v N co rn N O �: U C: -0 b-o m aj O C6 N C6 Q -0 a--+ cn U a--+ N C F Q C: v O N __,-z _0- •55 Lu aj E J +.r cn C6 aj i +N+ U aj O o v j0 N 0 ate-+ 0 aJ O N f1.4 }, w m v 4-10 V N O a--+ O O O O O O O O O O u1 O O O O O O E On in- ON M O Ln OM Ln Ln r-I qt r- rl� Q th i th th N O L a N N L Q) E , v E a' Ln N Ln N E o _ v U Cn �p m aJ � O Q E — ro a-+ Q f0 O N v E- U Ln U -0 5 aJ N Q) N +� +� i Q Q ro L.L w O U U C: _ra d a cn cn U C6 0- oZS o N fB � 0 � Q) •O aJ c av-+ r � U (I)+-' � ate-+ r E 0 }' -r- i Z3 U ro = 2 c Q c m a--+ N ca = N — ate, U 0 � J •Q � U 4- +_J U 0 O m N _ J N _0 O m � _ J ro cn N � Q) Q N r,4 > O Q — 4-j (% a--+ O O O O O O O O O O O O O O Ln Ln Sri E Ln (14 oo m Q V V')- Ln � a= a 0- 0 ai ai Q a� Q ai o u o ai =5 N o O O +- O . = O +v+ +v+ O � a) Ln f6 f6 Ol f6 i ro ' Ln � LL N LD �p v ON + o p 0 �n N O U o ai a= 4 -' co c O � 0 N O ro N O +JLn >w O v � >' > O V) � c a) f n +� O U Ln N C6 — C6 E -,.n V aJ O NE V N w N v a O a C: aJ cn O m r ai N E �— co N E o oc L � > +� co v a ro v � v ro � ro 2 � a) ?: N � Lnro J v az aA z v az �° o> o>aj , C: }' O o O O O O o o O O O O In O o In O O O 1�0 O O Sri �o Sri o o M o E -;t N l0 N I;t Kt E E U U U U U U ro ro m ro ro ro U of i tY tY tY UD � w v w UD p -0 _0 _0 N m m m m m m ro Z Z Z C Z Z Z3 CT CT � ro � CT CT LL w w w N w w w O r, co Ln r,r) — rl 00 _0 — _0 — _0 r-i v ca c6 Q) � � O U � O ^ ++ .. N 00 O ^ O O O v O -4 o CLO O O Lr � 0 m Ln � N O M rl : = N � v -Ln Ln vi- 00 to ri to v > l0 to N ''' DC }' U 4- rri t +-+ (n OLn w 4-j 0 o Ln o_ O O CO U- O v O ';1- O ++ N N 0 O O +-+ O +-+ O � O � O p 00 UO O p m � p o m -0 In a) Ln CDN M O O O N fir) O a)N M O Ln O N o rl o N o m tn• CO tn• CO 4j1 U t/)- N tn- N W t/)- N to a"' N Q) Ul) U0 N Ln Q) L/) Q) � Q) N O u O u O 4A O (Z O n1 O O ' Q Q a-J 4J +jro Q + Q aJ + Q w 4* Z� Z� Z z z� 0 zcr- z W V ro ro co LL MO LLJ .. O O N m m m^ o l0 m o l0 o0 00 rn � M 00 m o N 0 m Ln _ Ln n m m 00 m � orn o nm 4 Ln 0 00 N • O 00 r-1 rl O p 000 00 fV M O ON O ko I� � O r-I N m lD lD O lD I- m M N W O O� � O N • m Ln N ri M Sri rl4 e of � �D rn m ro • `�? o o `n � r- O � • r4' 00 lD � m Jo Jo � 00 Kt � rn N LL -0 C -0 C ::3 a� Z3 LL 4 41 E v p i — LL Q p v > U U m = LL _ f� U 4-1 f6 N =3 N N Z3 Q +, : � U Li ^-1 >W i +�+ U) o m C a U -0 a ru N Z3 Ln w Q 0- w a _0 O 00 O O � + _ f6 06 U) QVj ~ O o6 o r-I ~ Qro > 4- >, N ru O o a o a a (n U � o0 p No o o O m ri 910 ri flo ri Q0 ri (�D ri 910 ri Ca u1 Ln m rl l- 00 r-I � m r-1 00 00 O ;1- m O N rl rl 00 00 00 r- Ln — _ '� rl N rl rV N rl M M M N CV N O � O � O O O O O O O N 11 O � O qt O n m Ql 00 rl 00 M M Ln O} _0 (�0 0 0 0 0 0 0 0 0 0 0) 00 0 0 0 0 0 0 0 0 o U �� ail Ln Ln Ln Ln Ln � Ln � Ln � Ln � Ln � � r (0 m m m M m m m m M m m � � O cV M M 1.0 I- 00 M O r-I N M CO N 0 N 0 N 0 N 0 N 0 N 0 N 0 N 0 M 0 M 0 M 0 M 0 cn � V) oU U C •- � =3 ca ca O Q. li-� O .Oc CT cn 4� O w ca 70 V +, V V O . _ O ca +-+ Ln O L-� -C 4-j Ln O vi N Q V O aLLa� a� O o V) ca `~ V — +� a-j �O � V ca cn uLn u Ln 0 4-j V LL ,� V CTa) >- J (D o> 0 O O °' 0 O Q J ca V) p 4-J cn = (z. 0 Q a cn Ln E .N ca V E bn 4- Attachment B 2024-2028 Proposed CAPITAL IMPROVEMENT PLAN CITY OF ARDEN HILLS Council Work Session July 17, 2023 TABLE OF CONTENTS Section Department Summary Capital Improvement Plan by Department Capital Improvement Project Detail Sheets Projects by Funding Source Sources and Uses of Funds Page 1 2 4 61 65 City of Arden Hills, Minnesota Capital Improvement Plan 2024 thru 2028 DEPARTMENT SUMMARY Department 2024 2025 2026 2027 2028 Total Economic Development 270,000 40,000 310,000 Equipment 540,150 667,170 482,000 863,000 514,000 3,066,320 Government Buildings 50,000 210,000 50,000 50,000 270,000 630,000 Parks Department 320,000 3,700,000 800,000 965,000 1,750,000 7,535,000 Public Safety 504,750 323,290 401,250 567,660 512,760 2,309,710 Sanitary Sewer Department 945,000 610,000 900,000 2,455,000 Street Department 2,775,000 1,955,000 3,765,000 8,495,000 Water Department 1,195,000 1,090,000 270,000 150,000 20,000 2,725,000 TOTAL 6,329,900 6,870,460 3,958,250 3,535,660 6,831,760 27,526,030 Produced Using the Plan -It Capital Planning Software 1 City of Arden Hills, Minnesota Capital Improvement Plan 2024 thru 2028 PROJECTS BY DEPARTMENT Department Project # Priority 2024 2025 2026 2027 2028 Total Economic Develoument Gateway Signs 25-EDA-001 n/a 270,000 40,000 310,000 Economic Development Total 270,000 40,000 310,000 Equipment Trade in Program Toro Z Mowers #473 & #474 24-Eqo-001 3 45,000 45,000 90,000 Replace Bobcat Broom Attachment #475 24-Eqp-002 3 6,500 6,500 Replace Bobcat Forestry Head Attachment #464 24-Eqp-003 2 25,000 25,000 Emergency Generator Replacement Schedule 24-Eqp-004 2 160,000 150,000 150,000 150,000 610,000 Replace 2012 F450 Dump Body/Plow Truck #441 24-EgpV-001 3 120,000 120,000 Replace 2012 Intl Plow Wing Truck #115 24-EgpV-002 n/a 143,650 180,170 323,820 Replace 2013 Ford Escape #504 24-EgpV-003 n/a 40,000 40,000 Replace 1993 Case 621 Loader #103 25-Eqp-001 n/a 260,000 260,000 Replace 1996 Wacker 880 Roller #106 25-Eqp-002 3 25,000 25,000 Replace 2006 Felling Trailer #415 25-Eqp-003 3 12,000 12,000 Replace 2020 Bobcat Toolcat #461 25-Eqp-004 2 70,000 70,000 Replace 2013 Ford F-450 Plow/Dump Truck #318 25-EgpV-001 3 120,000 120,000 Replace 2018 Toro Large Area Mower #457 26-Eqp-001 3 100,000 100,000 Replace 1996 Redi-Haul Trailer #108 26-Eqp-002 3 12,000 12,000 Replace 2016 F-350 wN-Plow and Liftgate #215 26-EgpV-001 3 80,000 80,000 Replace Bobcat Snowblower Attachment #467 27-Eqp-001 4 8,000 8,000 Replace 2000 Backhoe #204 27-Eqp-002 3 160,000 160,000 Replace 2009 Sterling Acterra Truck #431 27-EgpV-001 3 140,000 150,000 290,000 Replace 2016 F-350 Pickup w/Liftgate #455 27-EgpV-002 4 80,000 80,000 Replace 2015 Ford F450 Plow/Dump Truck #320 27-EgpV-003 2 120,000 120,000 Replace Bobcat Snowblower 84" #118 28-Eqp-001 3 9,000 9,000 Replace 2009 Husqavarna Pavement Saw #113 28-Eqp-002 3 10,000 10,000 Replace 1998 Tow Behind Air Compressor #107 28-Eqp-003 3 35,000 35,000 Replace 2016 Stepp Asphalt Patch Trailer #121 28-Eqp-004 3 75,000 75,000 Replace 2017 Mack Plow/Wing/Dump Truck #123 28-EgpV-001 5 150,000 190,000 340,000 Replace 2019 Ford F-150 Ext Cab w/Toolbox #601 28-EgpV-002 3 45,000 45,000 Equipment Total 540,150 667,170 482,000 863,000 514,000 3,066,320 Government Buildings City Hall Maintenance 24-Bldg-005 2 50,000 50,000 50,000 50,000 50,000 250,000 City Hall roof 25-Bldg-002 3 160,000 160,000 City Hall Air Handler Replacement 28-Bldg-001 3 220,000 220,000 Government Buildings Total 50,000 210,000 50,000 50,000 270,000 630,000 Parks Department Hard Court Rehabilitation 24-Park-001 3 320,000 160,000 100,000 580,000 Park Shelter Replacements 25-Park-001 4 100,000 100,000 Playground Structure Replacement 25-Park-002 3 300,000 320,000 620,000 Cummings Park Roof Maintenance 25-Park-003 3 40,000 40,000 Produced Using the Plan -It Capital Planning Software 2 Department Project # Priority 2024 2025 2026 2027 2028 Total Hazelnut Park Parking Lot Improvements 25-Park-004 4 300,000 300,000 Old Hwy 10 Trail - 96 to Valentine Park 25-Park-005 n/a 2,800,000 2,800,000 MN-51 Trail Connection 26-Park-005 n/a 800,000 800,000 Perry Park Improvements 27-Park-005 4 295,000 295,000 Lake Johanna Blvd Trail 28-Park-001 3 250,000 1,750,000 2,000,000 Parks Department Total 320,000 3,700,000 800,000 965,000 1,750,000 7,535,000 Public Safety i LJFD Engine/Ladder Replacement 24-Pub-001 n/a 449,940 234,240 684,180 LJFD Rescue/Command/Utility Vehicle Replacement 24-Pub-002 n/a 1,950 26,470 75,270 27,820 207,160 338,670 LJFD General Equipment 24-Pub-003 n/a 35,970 15,000 175,680 15,000 15,000 256,650 LJFD Station Capital 24-Pub-004 n/a 16,890 281,820 10,000 10,000 10,000 328,710 Lake Johanna Fire Dept Fire Station 26-Pub-005 n/a 140,300 280,600 280,600 701,500 Public Safety Total 504,750 323,290 401,250 567,660 512,760 2,309,710 Sanitary Sewer Department Lift Station Rehabilitation 24-Sew-001 2 530,000 210,000 260,000 1,000,000 Sewer Lining/Rehabilitation 24-Sew-002 2 415,000 400,000 640,000 1,455,000 Sanitary Sewer Department Total 945,000 610,000 900,000 2,455,000 Street Department 2024 PMP 24-Str-001 2 2,775,000 2,775,000 2026 PMP 26-Str-001 2 1,955,000 11955,000 2028 PMP 28-Str-001 2 3,765,000 3,765,000 Street Department Total 2,775,000 1,955,000 3,765,000 8,495,000 Water Department Water Tower Maintenance 24-W-001 2 250,000 10,000 150,000 410,000 Water Meter Replacement & Lead/Copper Inventory 24-W-003 3 525,000 900,000 1,425,000 Trunk Water Main Improvements - Roseville 24-W-004 2 385,000 385,000 Water System Model Update 25-W-001 3 40,000 40,000 Booster Station Improvements 25-W-002 2 150,000 150,000 MN-51 Water & Sewer Forcemain Crossings 26-W-002 3 35,000 240,000 275,000 Trunk Water Main Improvements 26-W-003 2 20,000 20,000 40,000 Water Department Total 1,195,000 1,090,000 270,000 150,000 20,000 2,725,000 GRAND TOTAL 6,329,900 6,870,460 3,958,250 3,535,660 6,831,760 27,526,030 Produced Using the Plan -It Capital Planning Software 3 Capital Improvement Plan 2024 thrtt 2028 City of Arden Hills, Minnesota Project # 25-EDA-001 Project Name Gateway Signs TCAAP No Department Economic Development Contact Community Devl Dir Type Improvement Useful Life Category Economic Devi Improvement Priority n/a Description I Total Project Cost: $310,000 Install gateway signs at major entry points to the City. Potential locations for signs include: (1) Highway 96 at Round Lake Road, (2) Highway 96 at Lexington Avenue, (3) Lake Valentine Road at 35W, (4) County Road E at Lexington Avenue, (5) Lexington Avenue at County Road F, (6) Lexington Avenue at County Road D, and (7) County Road E at Highway 51. Potential sign locations are not listed in order of priority and are subject to change. There are three existing gateway signs in the following locations: (1) County Road E2 at I-35W, (2) County Road D at Cleveland Avenue, and (3) Lake Johanna Boulevard at the Roseville border. Staff has budeeted for the comDletion of an additional eatewav sien in 2026 at a location to be determined. Justification kdvance the economic development goals in the 2040 Comprehensive Plan. Implement the Guiding Plan for the B2 District. Work to better .dentify the entrance points to the City for businesses and visitors. Foster civic pride and community identity. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 270,000 40,000 310,000 Total 270,000 40,000 310,000 Funding Sources 2024 2025 2026 2027 2028 Total EDA General Fund 270,000 40,000 310,000 Total 270,000 40,000 310,000 maintenance costs for sign cleaning and care of landscaping is estimated by the Public Works Department at $500 per sign annually. Produced Using the Plan -It Capital Planning Software 4 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 24-Eqo-001 Project Name Trade in Program Toro Z Mowers #473 & #474 TCAAP No Department Equipment Contact Public Works Director Type Equipment Useful Life 5 Category Equipment: Public Works Priority 3Important Description I Total Project Cost: $180,000 Zeplace Two 2021 Toro "Z" Lawn Mowers #473 & #474 (parks). 973 - 215 hours 974 - 195 hours These were last replaced in January 2022. �ost of 2 machines: $40,930 Trade in values:-$15,000 Vet cost of 2 machines: $25,930 "arts and labor costs: 973 2022 - $312.72 974 2022 - $182.00 Justification the trade in value of the Toro "Z" mowers is maximized if they are traded in with warranty still remaining. Due to the amount of time these pieces )f equipment are used during the summer months, they are traded in on a three year cycle. Zepair costs are under factory warranty. Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 45,000 45,000 90,000 Total 45,000 45,000 90,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 30,000 30,000 60,000 Replacement Fund Trade -In Value 15,000 15,000 30,000 Total 45,000 45,000 90,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software E Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 24-Eqp-002 Project Name Replace Bobcat Broom Attachment #475 TCAAP No Description Zeplace 2005 Bobcat broom attachment. 3stimated auction return - $1,500. Department Equipment Contact Public Works Director Type Equipment Useful Life 15 Category Equipment: Public Works Priority 3Important Total Project Cost: $6,500 Justification Phis skid steer attachment is used for sweeping trails/sidewalks, and street cleaning as needed. This unit is currently 19 years old and is past its xseful life. Zepair costs from 2019-2023 total - $1,250 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 6,500 6,500 Total Funding Sources 6,500 2024 2025 6,500 2026 2027 2028 Total Equipment/Building Replacement Fund Trade -In Value 5,000 1,500 5,000 1,500 Total 6,500 6,500 Budget Impact/Other Produced Using the Plan -It Capital Planning Software R Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 24-Eqp-003 Project Name Replace Bobcat Forestry Head Attachment #464 TCAAP No Department Equipment Contact Public Works Director Type Equipment Useful Life 8-10 Category Equipment: Public Works Priority 2 Very Important Description I Total Project Cost: $25,000 Zeplacement of a 2015 Forestry attachment for use on the Bobcat Mini Excavator (#85464). 3stimated auction return - $2,500. Justification Phis attachment clears brush and tree debris within the parks and surrounding trails and sidewalks. Staff recommends replacement due to structural °ailure and the equipment is past its useful life. Zepair costs from 2019-2023 total - $1,614 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 25,000 25,000 Total Funding Sources 25,000 2024 2025 25,000 2026 2027 2028 Total Equipment/Building Replacement Fund Trade -In Value 22,500 2,500 22,500 2,500 Total 25,000 25,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 7 Capital Improvement Plan 2024 thYu 2028 Department Equipment City of Arden Hills, Minnesota Contact Public Works Director Project # 24-Eqp-004 Type Equipment Useful Life 20-25 Project Name Emergency Generator Replacement Schedule g y p Category Equipment: Public Works TCAAP No Priority 2 Very Important Description Total Project Cost: $610,000 The water department, sewer department, and city hall standby power (EOC) utilizes a total of 4 standby generators ranging in model years (1999- 2005). This equipment is in need of a replacement schedule. Estimated auction return is $5,000 each. Justification Due to the emergency needs, factors like outdated technology, parts availability, dependability, and repair costs are taken into account with the •eplacement plan. Additionally, stationary mount natural gas fueled generators are much more efficient and do not suffer from the reliability issues ;een with diesel fueled units. PW plans to replace generators on a priority basis. Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 160,000 150,000 150,000 150,000 610,000 Total 160,000 150,000 150,000 150,000 610,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 145,000 145,000 Replacement Fund Sanitary Sewer Utility Fund 155,000 145,000 300,000 Trade -In Value 5,000 5.000 57000 5,000 20,000 Water Utility Funds 145,000 145,000 Total 160,000 150,000 150,000 150,000 610,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 8 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 24-EgpV-001 Project Name Replace 2012 F-450 Dump Body/Plow Truck #441 TCAAP No Description Vehicle #441 - 2012 Ford F-450 Dump Body/Plow Truck (parks). VIN # 1647 Mileage 4 1, 100 Justification Department Equipment Contact Public Works Director Type Equipment Useful Life 10-12 Category Vehicles Priority 3Important Total Project Cost: $120,000 Phis truck is used on one of three street plow routes. Also, the truck is used year round for Public Works operations, brush removal, paving and naterial hauling. Staff recommends replacing every 12 years due to corrosion and high cost of ownership. ?arts and labor costs: 2019 - $4,761 2020 - $ 881 2021 - $4,574 2022 - $ 169 2023 - $ 400 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 120,000 120,000 Total 120,000 120,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 100,000 100,000 Replacement Fund Trade -In Value 20,000 20,000 Total 120,000 120,000 Budget Impact/Other Zeduce maintenance and repair costs. Produced Using the Plan -It Capital Planning Software 9 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota 3roject # 24-EgpV-002 'roject Name Replace 2012 Intl Plow Wing Truck #115 TCAAP No Description Vehicle #115 - 2012 International Plow Wing Truck Phis purchase was approved by council in 2022. Justification Vehicle will be 12 years old. Department Equipment Contact Public Works Director Type Equipment Useful Life 10-12 Category Vehicles Priority n/a Total Project Cost: $323,820 ;pair costs for parts and labor: 18 - $ 8,445 19 - $10,672 20 - $ 2,685 21 - $6,345 its is one of our three large dump trucks used primarily for plowing and de-icing streets. While the mileage on this vehicle is relatively low, due the corrosiveness of salt, the frame and bodies are beginning to deteriorate. With only three dump trucks in the snow plow fleet it is imperative it they be dependable during snow events. Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 143,650 180,170 323,820 Total 143,650 180,170 323,820 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 143,650 150,170 293,820 Replacement Fund Trade -In Value 30,000 30,000 Total 143,650 180,170 323,820 Budget Impact/Other 2educe repair and maintenance costs and improve reliability of our primary snow removal equipment. Produced Using the Plan -It Capital Planning Software 10 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 24-EgpV-003 Project Name Replace 2013 Ford Escape #504 TCAAP No Description Zeplace 2013 Ford Escape. Mileage 63,000 Justification Department Equipment Contact City Administrator Type Equipment Useful Life 10 Category Vehicles Priority n/a Total Project Cost: $40,000 the current vehicle will be 11 years old and there is corrosion on the undercarriage. A multipurpose vehicle, like an Escape, will serve other City ;mployees when they want to use a City vehicle to attend meetings and conferences - especially when they are out of town. ?arts and labor costs: 2018 - $ 429 2019 - $1,205 2020 - $ 0 2021 - $ 530 2022 - $ 48 2023 - $ 85 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 40,000 40,000 Total 40,000 40,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 32,000 32,000 Replacement Fund Trade -In Value 8,000 8,000 Total 40,000 40,000 Budget hnpact/Other ost of maintenance. Produced Using the Plan -It Capital Planning Software 11 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-Eqp-001 Project Name Replace 1993 Case 621 Loader #103 TCAAP No Description Vehicle #103 - 1993 Case 621 Loader Sours 3,578 Justification Department Equipment Contact Public Works Director Type Equipment Useful Life 20-25 Category Vehicles Priority n/a Total Project Cost: $260,000 Vehicle will be 32 years old. This piece of equipment is used year round for loading trucks, stock pile management, and is a backup to our snow plow fleet. Also, during emergencies, it is used for clearing trees to open roadways and access utilities. Do to its age, this loader is showing deterioration and some significant corrosion. Staff recommends replacement in 2025. Parts and labor costs: 2019 - $1,652 2020 - $2,361 2021 - $5,150 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 260,000 260,000 Total Funding Sources 2024 260,000 2025 2026 260,000 2027 2028 Total Equipment/Building Replacement Fund Trade -In Value 245,000 15,000 245,000 15,000 Total 260,000 260,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 12 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-Eqp-002 Project Name Replace 1996 Wacker 880 Roller #106 TCAAP No Department Equipment Contact Public Works Director Type Equipment Useful Life 15-17 Category Equipment: Public Works Priority 3Important Description I Total Project Cost: $25,000 2eplace Equipment #106 - 1996 Wacker Roller. VIN # 673603994 Sours: 972 Phis piece of equipment was included in previous CIP's but has been deferred to allow time to determine the size roller that would work best based )n the amount of work the PW staff is able to complete. Also, staff evaluates its condition each year to evaluate its reliability. Justification 3quipment will be 29 years old. Roller is used for small pothole patching. Part availability is becoming an issue. ?arts and labor costs (provided by AH PW crew): Z018 - $425 Z019 - $130 ?020 - $635 ?021 - $725 ?022 - $361 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 25,000 25,000 Total 25,000 25,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 24,500 24,500 Replacement Fund Trade -In Value 500 500 Total 25,000 25,000 Budget Impact/Other 2educed equipment repair costs. Produced Using the Plan -It Capital Planning Software 13 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-Eqp-003 Project Name Replace 2006 Felling Trailer #415 TCAAP No Department Equipment Contact Public Works Director Type Equipment Useful Life 15 Category Equipment: Public Works Priority 3Important Description Total Project Cost: $12,000 Multi use trailer used mainly in the Parks Department to transport mowers, field equipment and supplies. 3stimated auction return $4,000 Justification Phis trailer is currently 17 years old and is showing signs of corrosion. Zepair costs form 2019-2023 total - $648 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 12,000 12,000 Total Funding Sources 2024 12,000 2025 2026 12,000 2027 2028 Total Equipment/Building Replacement Fund Trade -In Value 8,000 4,000 8,000 4,000 Total 12,000 12,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 14 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-Eqp-004 Project Name Replace 2020 Bobcat Toolcat #461 TCAAP No Description Zeplace 2020 Bobcat Toolcat #461. lours523 Estimated auction return $25,000 Equipment may need to be replaced in 6 years. I Justification I Department Equipment Contact Public Works Director Type Equipment Useful Life 5 Category Equipment: Public Works Priority 2 Very Important Total Project Cost: $140,000 PW currently owns 2 Toolcat's and the primary purpose is snow removal along sidewalks and park trails. During the winter months, the machines are cleaned but salt and the heavy load out on the machine equates to costly repairs and down time. The machine is also used in the summer months on a weekly basis. Equipment repair costs from 2020-2023 total - $4,857 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 70,000 70,000 Total Funding Sources 2024 70,000 2025 2026 70,000 2027 2028 Total Equipment/Building Replacement Fund Trade -In Value 45,000 25,000 45,000 25,000 Total 70,000 70,000 Budget hnpact/Other Time efficiency resulting in labor savings. Produced Using the Plan -It Capital Planning Software 15 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-EgpV-001 Project Name Replace 2013 Ford F-450 Plow/Dump Truck #318 TCAAP No Department Equipment Contact Public Works Director Type Equipment Useful Life 10-12 Category Vehicles Priority 3Important Description I Total Project Cost: $120,000 Zeplace 2013 Ford F750 Plow/ Dump Truck. This replacement would include plow, dump body and salt spreader with related controls. Mileage 32,300 3stimated auction return $25,000 Justification Phis truck is used year round and a primary piece of equipment. Due to normal wear and corrosion factors, it's recommended for replacement within the recommended 12 year window. Zepair costs from 2019-2023 total - $7,939 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 120,000 120,000 Total Funding Sources 2024 120,000 2025 2026 120,000 2027 2028 Total Equipment/Building Replacement Fund Trade -In Value 95,000 25,000 95,000 25,000 Total 120,000 120,000 Budget Impact/Other Zeduced repair and maintenance costs. Produced Using the Plan -It Capital Planning Software 16 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 26-Eqp-001 Project Name Replace 2018 Toro Large Area Mower #457 TCAAP No Description Zeplacement of the 2018 Toro large area mower. Sours 1,375 Justification Department Equipment Contact Public Works Director Type Equipment Useful Life 10-12 Category Equipment: Public Works Priority 3Important Total Project Cost: $100,000 the Toro large area mower will be 8 years old in 2026. This mower is a key piece of equipment for mowing operations. To avoid downtime, staff •ecommends replacement prior to costly repairs. ?arts and labor costs (provided by AH PW crew): 2019 - $230 2020 - $739 2021 - $260 2022 - $260 2023 - $125 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 100,000 100,000 Total 100,000 100,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 80,000 80,000 Replacement Fund Trade -In Value 20,000 20,000 Total 100,000 100,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 17 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 26-Eqp-002 Project Name Replace 1996 Redi-Haul Trailer #108 TCAAP No Description Zeplace 1996 Redi-Haul trailer. 3stimated auction return $1,500 Department Equipment Contact Public Works Director Type Equipment Useful Life 20 Category Equipment: Public Works Priority 3Important Total Project Cost: $12,000 Justification Phis trailer is used mainly within the streets department to transport the asphalt roller and other miscellaneous equipment. Zepair costs for 2019-2023 total - $580 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 12,000 12,000 Total Funding Sources 2024 12,000 2025 2026 2027 12,000 2028 Total Equipment/Building Replacement Fund Trade -In Value 10,500 1,500 10,500 1,500 Total 12,000 12,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 18 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 26-EgpV-001 Project Name Replace 2016 F-350 w/V-Plow and Liftgate #215 TCAAP No Description Vehicle #215 - 2016 Ford F-350 Regular Cab with V-Plow and Liftgate (streets) VIN # 3941 Mileage 47,300 Justification Department Equipment Contact Public Works Director Type Equipment Useful Life 10 Category Vehicles Priority 3Important Total Project Cost: $80,000 the pickup is used year round for Public Works operations but the primary use is plowing trails, sidewalks and parking lots. Due to plowing stress and corrosion factors, staff recommends replacement at 10 years. ?arts and labor costs: 2019 - $1,104 2020 - $ 989 2021 - $1,285 2022 - $1,408 2023 - $1,572 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 80,000 80,000 Total 80,000 80,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 65,000 65,000 Replacement Fund Trade -In Value 15,000 15,000 Total 80,000 80,000 Budget Impact/Other Zeduce maintenance and repair costs. Produced Using the Plan -It Capital Planning Software 19 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 27-Eqp-001 Project Name Replace Bobcat Snowblower Attachment #467 TCAAP No Description Zeplace 2014 Bobcat snowblower attachment. :stimated auction return - $1,500. Justification Phis attachment is used for ice rink maintenance. Zepair costs from 2019-2023 total - $270 Department Equipment Contact Public Works Director Type Equipment Useful Life 10-12 Category Equipment: Public Works Priority 4 Less Important Total Project Cost: $8,000 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 8,000 8,000 Total Funding Sources 2024 8,000 2025 2026 2027 2028 8,000 Total Equipment/Building Replacement Fund Trade -In Value 6,500 1,500 6,500 1,500 Total 8,000 8,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 20 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 27-Eqp-002 Project Name Replace 2000 Backhoe #204 TCAAP No Description Zeplace 2000 Case 590 Super L Backhoe. Sours 3,336 3stimated auction return - $15,000 Department Equipment Contact Public Works Director Type Equipment Useful Life 20-25 Category Equipment: Public Works Priority 3Important Total Project Cost: $160,000 Justification Phis piece of equipment is used in streets, water, and miscellaneous needs department wide and around the PW Facility. Due to age and corrosion, Aaff recomends replacment in 2027. The backhoe will be 27 years old. Zepairs costs 2019-2022 $7,956. Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 160,000 160,000 Total Funding Sources 2024 160,000 2025 2026 2027 2028 160,000 Total Equipment/Building Replacement Fund Trade -In Value 145,000 15,000 145,000 15,000 Total 160,000 160,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 21 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 27-EgpV-001 Project Name Replace 2009 Sterling Acterra Truck #431 TCAAP No Department Equipment Contact Community Devl Dir Type Equipment Useful Life 10 Category Vehicles Priority 3Important Description Total Project Cost: $290,000 Zeplace 2009 1,500 gallon tanker truck used for watering, sweeping, dust control and rink flooding. Mileage 26,600 Justification Current vehicle will be 18 years old in 2027. Corrosion due to winter operations and availability of parts. Parts and labor costs: 2018 - $2,112 2019 - $2,618 2020 - $3,303 2021 - $2,060 2022 - $5,613 2023 - $ 323 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 140,000 150,000 290,000 Total 140,000 150,000 290,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 140,000 125,000 265,000 Replacement Fund Trade -In Value 25,000 25,000 Total 140,000 150,000 290,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 22 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 27-EgpV-002 Project Name Replace 2016 F-350 Pickup w/Liftgate #455 TCAAP No Description Vehicle #455 - 2016 Ford F-350 Crew Cab with Liftgate (parks). VIN # 3955 Mileage 55,100 Justification Department Equipment Contact Public Works Director Type Equipment Useful Life 10 Category Vehicles Priority 4 Less Important Total Project Cost: $80,000 the crew cab truck is used year round for efficiency with more staff seating. Seasonal staff can utilize one truck for up to 4 people. Due to rising •epair costs, the recommendation is to replace at 10-11 years. ?arts and labor costs: 2019 - $ 965 2020 - $ 486 2021 - $1,200 2022 - $1,408 2023 - $ 435 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 80,000 80,000 Total 80,000 80,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 70,000 70,000 Replacement Fund Trade -In Value 10,000 10,000 Total 80,000 80,000 Budget Impact/Other Zeduce maintenance and repair costs. Produced Using the Plan -It Capital Planning Software 23 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 27-EgpV-003 Project Name Replace 2015 Ford F-450 Plow/Dump Truck #320 TCAAP No Department Equipment Contact Public Works Director Type Equipment Useful Life 10-12 Category Vehicles Priority 2 Very Important Description I Total Project Cost: $120,000 Zeplace 2015 Ford F750 Plow/ Dump Truck. This replacement would include plow, dump body and salt spreader with related controls. Mileage 31,300 3stimated auction return $25,000 Justification Phis truck is a primarily used year round for street route snow plowing, park maintenance, surface water repairs, and miscellaneous utility projects. k 12 year replacement cycle is recommended for reliability and maximizing return on investment. Zepair costs through 2019-2023 total - $9,850 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 120,000 120,000 Total Funding Sources 2024 120,000 2025 2026 2027 2028 120,000 Total Equipment/Building Replacement Fund Trade -In Value 95,000 25,000 95,000 25,000 Total 120,000 120,000 Budget Impact/Other Zeduced repair and maintenance costs. Produced Using the Plan -It Capital Planning Software 24 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota 3roject # 28-Eqp-001 'roject Name Replace Bobcat Snowblower 84" #118 TCAAP No Department Equipment Contact Public Works Director Type Equipment Useful Life 10-12 Category Equipment: Public Works Priority 3Important Description I Total Project Cost: $9,000 Zeplacement of a Bobcat Snowblower attachment used for snow removal along sidewalks, trails, parking lots, and miscellaneous snow removal auction return - $2,000 Justification the attachment will be at the end of its useful life in 2028. 19- 2023 repairs costs- $328 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 9,000 9,000 Total 9,000 9,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 7,000 7,000 Replacement Fund Trade -In Value 2,000 2,000 Total 9,000 9,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 25 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 28-Eqp-002 Project Name Replace 2009 Husqavarna Pavement Saw #113 TCAAP No Description Zeplace walk behind pavement saw. Sours- 110 3stimated auction return - $2,500 Department Equipment Contact Public Works Director Type Equipment Useful Life 15-17 Category Equipment: Public Works Priority 3Important Total Project Cost: $10,000 Justification Phis saw is used to cut asphalt and concrete for street patching and concrete repairs. In 2028, this equipment will be 19 years old and past its useful costs between 2019- 2023- $1,300 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 10,000 10,000 Total Funding Sources 2024 10,000 2025 2026 2027 2028 10,000 Total Equipment/Building Replacement Fund Trade -In Value 7,500 2,500 7,500 2,500 Total 10,000 10,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 26 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 28-Eqp-003 Project Name Replace 1998 Tow Behind Air Compressor #107 TCAAP No Description Zeplace 1998 Leroi tow behind Air Compressor. Sours 553 auction return - $1,500 Department Equipment Contact Public Works Director Type Equipment Useful Life 30 Category Equipment: Public Works Priority 3Important Total Project Cost: $35,000 Justification Phis piece of equipment is used for street and irrigation maintenance. In 2028, this equipment will be 30 years old and past its useful life. Zepair costs between 2019- 2022- $1,250 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 35,000 35,000 Total Funding Sources 2024 35,000 2025 2026 2027 2028 35,000 Total Equipment/Building Replacement Fund Trade -In Value 33,500 1,500 33,500 1,500 Total 35,000 35,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 27 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 28-Eqp-004 Project Name Replace 2016 Stepp Asphalt Patch Trailer #121 TCAAP No Description Zeplace 2016 Stepp Asphalt Patch Trailer. 3stimated auction return - $25,000 Department Equipment Contact Public Works Director Type Equipment Useful Life 10-12 Category Equipment: Public Works Priority 3Important Total Project Cost: $75,000 Justification the patch trailer is used for street maintenance operations. This equipment will be 12 years old in 2028, near the end of its useful life and also with i relativly high auction return. Zepair costs between 2019- 2022- $4,665 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 75,000 75,000 Total Funding Sources 2024 75,000 2025 2026 2027 2028 75,000 Total Equipment/Building Replacement Fund Trade -In Value 50,000 25,000 50,000 25,000 Total 75,000 75,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 28 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 28-EgpV-001 Project Name Replace 2017 Mack Plow/Wing/Dump Truck #123 TCAAP No Description Vehicle #123 - 2017 Mack Single Axle Plow Wing Dump Truck (streets) Mileage 14,200 Justification Department Equipment Contact Public Works Director Type Equipment Useful Life 10-12 Category Vehicles Priority 5 Future Consideration Total Project Cost: $340,000 Sue to long lead times for specking, ordering and taking delivery, staff recommends ordering the plow truck chassis in 2027 and doing the build )ut in 2028. This will provide time to take delivery of a finished truck by 2029, making the current one 12 years old. Zepair costs for parts and labor: 2019 - $3,206 2020 - $4,557 2021 - $9,092 2022 - $8,443 2023 - $7,394 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 150,000 190,000 340,000 Total 150,000 190,000 340,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 150,000 155,000 305,000 Replacement Fund Trade -In Value 35,000 35,000 Total 150,000 190,000 340,000 Budget Impact/Other Zeduce repair and maintenance costs and improve reliability of our primary snow removal equipment. Produced Using the Plan -It Capital Planning Software 29 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 28-EgpV-002 Project Name Replace 2019 Ford F-150 Ext Cab w/Toolbox #601 TCAAP Yes Description Zeplace 2019 17-150 Extended Cab 4x4 Pickup. Mileage 23,100 3stimated auction return - $15,000 Department Equipment Contact Public Works Director Type Equipment Useful Life 8-10 Category Vehicles Priority 3Important Total Project Cost: $45,000 Justification the truck is used for miscellaneous use across departments within Public Works. In 2028, the truck will be 9 years old and at its useful life costs between 2019- 2022- $2,576 Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 45,000 45,000 Total Funding Sources 2024 45,000 2025 2026 2027 2028 45,000 Total Equipment/Building Replacement Fund Trade -In Value 30,000 15,000 30,000 15,000 Total 45,000 45,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 30 Capital Improvement Plan 2024 thYu 2028 Department Government Buildings City of Arden Hills, Minnesota Contact Finance Director Project # 24-Bldg-005 Type Maintenance Useful Life 10 Project Name City Hall Maintenance Category Building Repair & Maint TCAAP No Priority 2 Very Important Description Total Project Cost: $500,000 City Hall will require ongoing maintenance and replacement of items to maintain operational duties (carpet, painting, HVAC, etc.). Justification Items will be due for replacement, and will save the City future repair costs by replacing them in the near -tern. Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 50,000 50,000 50,000 50,000 50,000 250,000 Total 50,000 50,000 50,000 50,000 50,000 250,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 50,000 50,000 50,000 50,000 50,000 250,000 Replacement Fund Total 50,000 50,000 50,000 50,000 50,000 250,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 31 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-Bldg-002 Project Name City Hall roof TCAAP No Description Zeplace 9000 sq ft roof at City Hall. Justification ?laceholder for future project. Expenditures Department Government Buildings Contact Building Official Type Improvement Useful Life 20-25 Category Building Repair & Maint Priority 3Important Total Project Cost: $160,000 2024 2025 2026 2027 2028 Total Construction/Maintenance 160,000 160,000 Total 160,000 160,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 160,000 160,000 Replacement Fund Total 160,000 160,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 32 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 28-Bldg-001 Project Name City Hall Air Handler Replacement TCAAP No Description Zeplacement of the City Hall air handlers. Department Government Buildings Contact Building Official Type Improvement Useful Life 20-25 Category Building Repair & Maint Priority 3Important Total Project Cost: $220,000 Justification ?er the City's consultant in 2022, the air handlers at City Hall have between five and ten years of useful life left. These were installed when City Sall was built in the early 2000's. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 220,000 220,000 Total 220,000 220,000 Funding Sources 2024 2025 2026 2027 2028 Total Equipment/Building 220,000 220,000 Replacement Fund Total 220,000 220,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 33 Capital Improvement Plan City of Arden Hills, Minnesota Project # 24-Park-001 Project Name Hard Court Rehabilitation 2024 thru 2028 Department Parks Department Contact Public Works Director Type Improvement Useful Life 20-25 Category Park Capital Improvements TCAAP No Priority 3Important Justification Proposed improvements are intended to maintain existing court surfaces. In general, a court surface life is approximately 25 years before cracks and pavement deformation require full reconstruction. Routine crack filling to prolong court surfaces is being performed. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 320,000 160,000 100,000 580,000 Total 320,000 160,000 100,000 580,000 Funding Sources 2024 2025 2026 2027 2028 Total Capital Improvement Funds 210,000 160,000 100,000 470,000 (PIR) Grants 110,000 110,000 Total 320,000 160,000 100,000 580,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 34 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-Park-001 Project Name Park Shelter Replacements TCAAP No Description Zeplace park shelters ($50,000 each): Z025 - Cummings and Hazelnut ?029 - Royal Justification Shelters are deteriorating and reaching the end of service life. Department Parks Department Contact Public Works Director Type Improvement Useful Life Category Park Capital Improvements Priority 4 Less Important Total Project Cost: $150,000 Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 100,000 100,000 Total Funding Sources 2024 100,000 2025 2026 100,000 2027 2028 Total Capital Improvement Funds (PIR) 100,000 100,000 Total 100,000 100,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 35 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-Park-002 Project Name Playground Structure Replacement TCAAP No Description ?lay Structures are replaced on a 20 year replacement schedule. Oaks Park last replaced in 1999 - $150,000 ty Park last replaced in 1998 - $150,000 Park last replaced in 2000 - $170,000 Park last replaced 2001- $150,000 Hills Park last replaced 2002 - $150,000 Department Parks Department Contact Park & Recreation Mgr Type Improvement Useful Life Category Park Capital Equipment Priority 3Important Total Project Cost: $920,000 Valentine Park last replaced 2013 - $150,000 Justification In order to maintain playground structures that meet current safety guidelines, require a minimum amount of maintenance, and have replacement parts available, the City is attempting to maintain a replacement schedule for playground facilities based on available funds. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 300,000 320,000 620,000 Total Funding Sources 2024 300,000 2025 2026 320,000 2027 2028 620,000 Total Capital Improvement Funds (PIR) 300,000 320,000 620,000 Total 300,000 320,000 620,000 Produced Using the Plan -It Capital Planning Software 36 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-Park-003 Project Name Cummings Park Roof Maintenance TCAAP No Description L Zepair or replace roof shingles at this park. Z025 - Cummings Park Justification Zoofing materials are aging and deteriorating towards the end of the expected service life. Department Parks Department Contact Public Works Director Type Improvement Useful Life Category Park Capital Improvements Priority 3Important Total Project Cost: $40,000 Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 40,000 40,000 Total Funding Sources 2024 40,000 2025 2026 40,000 2027 2028 Total Capital Improvement Funds (PIR) 40,000 40,000 Total 40,000 40,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 37 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-Park-004 Project Name Hazelnut Park Parking Lot Improvements TCAAP No Description ?avement rehabilitation project involving full -depth reclamation. Department Parks Department Contact Public Works Director Type Improvement Useful Life Category Park Capital Improvements Priority 4 Less Important Total Project Cost: $300,000 Justification ?avement within the northern portion of lot is deteriorating and exceeding its service life. Parking lot resides on property owned by church and is available for public use under the terms of a Joint Use agreement. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 300,000 300,000 Total Funding Sources 2024 300,000 2025 2026 300,000 2027 2028 Total Capital Improvement Funds (PIR) 300,000 300,000 Total 300,000 300,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 38 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-Park-005 Project Name Old Hwy 10 Trail- 96 to Valentine Park TCAAP No Department Parks Department Contact Public Works Director Type Improvement Useful Life 20 Category Park Capital Improvements Priority n/a Description Total Project Cost: $3,050,000 onstruction of a new 6,500-feet in length, grade separated, 10-ft wide bituminous trail along the West side of Old Highway 10 from Lake Valentine Rd to Lakeshore Pl. Justification the new trail will improve safety and adequately accommodate pedestrians & bicyclists along the Old Highway 10 Corridor between Lake Valentine Rd and Lakeshore PI in Arden Hills. The proposed trail improvements will complete the North -South connection from MN-51 to Hwy - Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 2,800,000 2,800,000 Total Funding Sources 2024 2,800,000 2025 2026 2,800,000 2027 2028 Total Grants Ramsey County State Aid 1,400,000 550,000 850,000 1,400,000 550,000 850,000 Total 2,800,000 2,800,000 Budget Impact/Other the 6,500-feet of new trail will be the responsibility of the City to maintain. Maintenance includes, snow/ice control (seasonally), crack sealing :og sealing (approx. every 5 years). Produced Using the Plan -It Capital Planning Software 39 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 26-Park-005 Project Name MN-51 Trail Connection TCAAP No Department Parks Department Contact Public Works Director Type Improvement Useful Life 20 Category Park Capital Improvements Priority n/a Description Total Project Cost: $800,000 ?roposed new trail construction. Involves 1,700-feet of 8-feet wide bituminous trail along the west side of MN-51 from the Roseville border to Snelling Avenue North. ?otential wetland impacts and retaining wall needs near Johanna Marsh. Justification Phis trail segment is identified as a proposed pathway on the City's master trail system map. It is also identified in the Metropolitan Council Zegional Bicycle Transportation Network (RBTN) and is eligible for funding. MnDOT is scheduled to resurface MN-51 in 2026 within the )roximity of this proposed trail segment. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 800,000 800,000 Total Funding Sources 2024 800,000 2025 2026 2027 800,000 2028 Total Capital Improvement Funds (PIR) Grants 500,000 300,000 500,000 300,000 Total 800,000 800,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 40 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 27-Park-005 Project Name Perry Park Improvements TCAAP No Department Parks Department Contact Public Works Director Type Improvement Useful Life Category Park Capital Improvements Priority 4 Less Important Description I Total Project Cost: $295,000 ?avement rehabilitation project involving full -depth reclamation, spot curb repairs, ADA improvements and subgrade soil corrections - $250,000. 3all field grading - $30,000. Karming House roof - $15,000. Justification ?arking lot pavement is deteriorating and reaching the end of service life. Public Works has placed large area patches to extend usability. Cost of naintenance is increasing each year. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 295,000 295,000 Total 295,000 295,000 Funding Sources 2024 2025 2026 2027 2028 Total Capital Improvement Funds 295,000 295,000 (PIR) Total 295,000 295,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 41 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 28-Park-001 Project Name Lake Johanna Blvd Trail TCAAP No Department Parks Department Contact Public Works Director Type Improvement Useful Life 20 Category Park Capital Improvements Priority 3Important Description Total Project Cost: $2,000,000 onstruction of a new 8,100-feet in length, grade separated, 10-ft wide bituminous trail along Lake Johanna Blvd in the North/West orientation .rom County Rd D to Old Snelling Ave. Justification the new trail will improve safety and adequately accommodate pedestrians & bicyclists along the Lake Johanna Boulevard Corridor between Old Snelling Ave and County Road D in Arden Hills. The proposed Lake Johanna Boulevard trail improvements will provide critical connections )etween Arden Hills neighborhoods, neighboring Cities, Tony Schmidt Regional Park, Bethel College and Mounds View High School. Expenditures 2024 2025 2026 2027 2028 Total Planning/Design 250,000 260,000 510,000 Construction/Maintenance 1,490,000 1,490,000 Total 250,000 1,750,000 2,000,000 Funding Sources 2024 2025 2026 2027 2028 Total Capital Improvement Funds (PIR) State Aid Total 250,000 260,000 1,490,000 510,000 1,490,000 250,000 1,750,000 2,000,000 8,100-feet of new trail will be the responsibility of the City to maintain. Maintenance includes, snow/ice control (seasonally), crack sealing sealing (approx. every 5 years). Produced Using the Plan -It Capital Planning Software 42 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 24-Pub-001 Project Name LJFD Engine/Ladder Replacement TCAAP No Department Public Safety Contact City Administrator Type Equipment Useful Life Category Public Safety Priority n/a Description Total Project Cost: $942,820 ake Johanna Fire Department provides the City with a Capital Budget each year outlining expected capital outflows the fire department has )udgeted for the replacement of a fire engine in future years. Ladder Replacement Cost: $1,844,000 i Hills Cost: $449,940 Engine Replacement Cost: $960,000 i Hills Cost: $234,240 Engine Replacement Cost: $1,060,000 i Hills Cost: $258.64, Justification More detailed explanations can be found in the Lake Johanna Capital Budget. Expenditures 2024 2025 2026 2027 2028 Total EquipNehicles/Furnishings 449,940 234,240 684,180 Total 449,940 234,240 684,180 Funding Sources 2024 2025 2026 2027 2028 Total Public Safety Capital Fund 449,940 234,240 684,180 Total 449,940 234,240 684,180 Budget Impact/Other There are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a •esult of this project would be reflected in the fire services contract in reduced maintenance costs. Produced Using the Plan -It Capital Planning Software 43 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 24-Pub-002 Project Name LJFD Rescue/Command/Utility Vehicle Replacement TCAAP No Department Public Safety Contact City Administrator Type Equipment Useful Life Category Public Safety Priority n/a Description Total Project Cost: $431,880 ake Johanna Fire Department provides the City with a Capital Budget each year outlining expected capital outflows the fire department has )udgeted for the replacement of Rescue/Command/Utility vehicles in future years. D24 Tire Replacement otal Cost: $8,000 .rden Hills Cost: $1,950 D25 Command/Tire Replacement otal Cost: $108,500 .rden Hills Cost: $26,470 D26 Rescue/Tire Replacement otal Cost: $308,500 .rden Hills Cost: $75,270 D27 Command/Tire Replacement otal Cost: $114,000 .rden Hills Cost: $27,820 D28 Rescue/Command/Utility/Tire Replacement otal Cost: $849,000 .rden Hills Cost: $207,160 D29 Tire Replacement otal Cost: $9,500 rden Hills Cost: $2,320 2030 Rescue/Tire Replacement Total Cost: $372,500 Arden Hills Cost: $90,890 Justification More detailed explanations can be found in the Lake Johanna Capital Budget. Expenditures 2024 2025 2026 2027 2028 Total EquipNehicles/Furnishings 1,950 26,470 75,270 27,820 207,160 338,670 Total 1,950 26,470 75,270 27,820 207,160 338,670 Funding Sources 2024 2025 2026 2027 2028 Total Public Safety Capital Fund 1,950 26,470 75,270 27,820 207,160 338,670 Total 1,950 26,470 75,270 27,820 207,160 338,670 Produced Using the Plan -It Capital Planning Software 44 Capital Improvement Plan 2024 thYu 2028 Department Public Safety City of Arden Hills, Minnesota Contact City Administrator Budget Impact/Other are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a of this project would be reflected in the fire services contract in reduced maintenance costs. Produced Using the Plan -It Capital Planning Software 45 Capital Improvement Plan 2024 thYu 2028 Department Public Safety City of Arden Hills, Minnesota Contact City Administrator Project # 24-Pub-003 Type Equipment Useful Life Project Name LJFD General Equipment Category Public Safety TCAAP No Priority n/a Description Total Project Cost: $336,460 Lake Johanna Fire Department provides a detailed capital budget which includes the costs to each City. 2024 - Computers, moblie tablets, test SCBA bottles, hydraulic rescue tool, portable monitor, ladder equipment, console, Lexipol policy manual, set of irons Total Cost: $147,410 Arden Hills Cost: $35,970 2025 - Computers, network devices, Lexipol policy manual Total Cost: $24,410 Arden Hills Cost: $5,960 2026 SCBA Replacement Total Cost: $720,000 Arden Hills Cost: $175,680 2027 Computers, network devices, radios, hydraulic rescue tool Total Cost: $57,300 Arden Hills Cost: $13,980 There is a placcholder each year of up to $15,000 based on historical analysis. Justification More detailed explanations can be found in the Lake Johanna Capital Budget. Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 35,970 15,000 175,680 15,000 15,000 256,650 Total 35,970 15,000 175,680 15,000 15,000 256,650 Funding Sources 2024 2025 2026 2027 2028 Total Public Safety Capital Fund 35,970 15,000 175,680 15,000 15,000 256,650 Total 35,970 15,000 175,680 15,000 15,000 256,650 Budget Impact/Other There are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a •esult of this project would be reflected in the fire services contract in reduced maintenance costs. Produced Using the Plan -It Capital Planning Software 46 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 24-Pub-004 Project Name LJFD Station Capital TCAAP No Department Public Safety Contact City Administrator Type Equipment Useful Life Category Public Safety Priority n/a Description Total Project Cost: $378,710 Lake Johanna Fire Department provides the City with a Capital Budget each year outlining expected capital outflows. 2024 Station 120 gutters, bottle filler drinking fountains, Station 130 space upgrade and conference room AN upgrade Total Cost: $69,200 Arden Hills Cost: $16,890 2025 Station 140 roof, Station 130 remodel/addition and stucco redashing and EV charging infrastructure Total Cost: $1,155,000 Arden Hills Cost: $281,820 There is a placcholder each year of up to $10,000 based on historical analysis. Justification More detailed explanations can be found in the Lake Johanna Capital Budget. Expenditures 2024 2025 2026 2027 2028 Total Equip/Vehicles/Furnishings 16,890 281,820 10,000 10,000 10,000 328,710 Total 16,890 281,820 10,000 10,000 10,000 328,710 Funding Sources 2024 2025 2026 2027 2028 Total Public Safety Capital Fund 16,890 281,820 10,000 10,000 10,000 328,710 Total 16,890 281,820 10,000 10,000 10,000 328,710 are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a of this project would be reflected in the fire services contract in reduced maintenance costs. Produced Using the Plan -It Capital Planning Software 47 Capital Improvement Plan City of Arden Hills, Minnesota Project # 26-Pub-005 Project Name Lake Johanna Fire Dept Fire Station TCAAP Description onstruction of a new fire station. Justification Maintaining the fire station is critical to public safety. 2024 thru 2028 Department Public Safety Contact City Administrator Type Improvement Useful Life Category Public Safety Priority n/a Total Project Cost: $2,104,500 Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 140,300 280,600 280,600 701,500 Total 140,300 280,600 280,600 701,500 Funding Sources 2024 2025 2026 2027 2028 Total Public Safety Capital Fund 140,300 280,600 280,600 701,500 Total 140,300 280,600 280,600 701,500 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 48 Capital Improvement Plan 2024 thYu 2028 Department Sanitary Sewer Department City of Arden Hills, Minnesota Contact Public works Director Project # 24-Sew-001 Type Maintenance Useful Life 20 Project Name Lift Station Rehabilitation Category Sanitary Sewer Maintenance TCAAP No Priority 2 Very Important Description Total Project Cost: $1,200,000 Rehabilitation of lift stations to standardize and replace aging equipment, including pumps and electrical panels. 2024 Lift Station 5 (last update 2012) - Forcemain $300,000 Lift Station 5 (last update 2012) - Pumps, base and electronics $115,000 Lift Station 2 (last update 2012) - Pumps, base and electronics $115,000 2025 Lift Station 1 (last update 2012) - Pumps, base and electronics $105,000 Lift Station 9 (last update 2013) - Pumps, base and electronics $105,000 2027 Lift Station 8 (last update 2012) - Pumps, base and electronics $155,000 Lift Station 11 (last update 2016) - Pumps, base and electronics $105,000 2029 Lift Station 12 (last update 2012) - Pumps, base and electronics $100,000 Lift Station 4 (last update 2013) - Pumps, base and electronics $100,000 Justification The City has maintained a program to refurbish and update sanitary sewer lift stations on a 10-year cycle for reliability, technology and risk Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 530,000 210,000 260,000 1,000,000 Total 530,000 210,000 260,000 1,000,000 Funding Sources 2024 2025 2026 2027 2028 Total Sanitary Sewer Utility Fund 530,000 210,000 260,000 1,000,000 Total 530,000 210,000 Budget Impact/Other Zeduced maintenance costs. 260,000 1,000,000 Produced Using the Plan -It Capital Planning Software 49 Capital Improvement Plan City of Arden Hills, Minnesota Project # 24-Sew-002 Project Name Sewer Lining/Rehabilitation 2024 thru 2028 Department Sanitary Sewer Department Contact Public Works Director Type Maintenance Useful Life 30 Category Sanitary Sewer Maintenance TCAAP No Priority 2 Very Important Description Total Project Cost: $2,430,000 Sewer Lining and Rehabilitation of the sanitary sewer system on a 2-year cycle. (2024): Arden View Drive Neighborhood (2025): Glen Arden Neighborhood (2027): Venus Avenue Neighborhood (2029): Lift Station 2 Service Trail (2031): Hamline Avenue, Eide Circle, Floral Park connection (2033): In erson Neighborhood Justification As part of our sanitary sewer program, lines found with holes and cracks allowing for infiltration should be lined or repaired as needed. As the sewer infrastructure is aging, staff will continue to perform sewer inspections and identify locations needing sewer lining and other sewer Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 415,000 400,000 640,000 1,455,000 Total Funding Sources 415,000 2024 400,000 2025 2026 640,000 2027 2028 1,455,000 Total Sanitary Sewer Utility Fund 415,000 400,000 640,000 1,455,000 Total 415,000 400,000 640,000 1,455,000 project will help the overall I&I reduction program. Produced Using the Plan -It Capital Planning Software 50 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 24-Str-001 Project Name 2024 PMP TCAAP No Department Street Department Contact Public Works Director Type Improvement Useful Life 20-25 Category Streets: Reconstruction Priority 2 Very Important Description I Total Project Cost: $2,775,000 ?avement Management Program (PMP) improvements consisting of spot curb repair, resurfacing or full depth reclamation and new bituminous )avement, repairs to storm sewer inlets, drainage improvements, repairs to sanitary sewer manholes and castings, watermain improvements, iydrant and valve repairs. Street segments include Colleen Avenue/McClung (Hamlin to Snelling), Brian Knoll Drive & Ct, Norma Avenue "Colleen to Dawn Circle), Arden Vista Ct, Royal Hills (Snelling to Arden View Dr), Kiethson Drive (96 South), Royal Lane (Norma to Floral) and fames Avenue. Justification ?avement conditions are deteriorating with condition ratings from 24 to 57. Proposed improvements are necessary to continue safe and reliable >treet and utility services. These improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement vithin the City. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 2,775,000 2,775,000 Total 2,775,000 2,775,000 Funding Sources 2024 2025 2026 2027 2028 Total Capital Improvement Funds 1,000,000 1,000,000 (PIR) Other 1,000,000 1,000,000 Sanitary Sewer Utility Fund 175,000 175,000 Surface Water Mgmt Utility 400,000 400,000 Funds Water Utility Funds 200,000 200,000 Total 2,775,000 2,775,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 51 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 26-Str-001 Project Name 2026 PMP TCAAP No Department Street Department Contact Public Works Director Type Improvement Useful Life 20-25 Category Streets: Reconstruction Priority 2 Very Important Description I Total Project Cost: $1,955,000 ?avement Management Program (PMP) improvements consisting of spot curb repair, resurfacing or full depth reclamation and new bituminous )avement, repairs to storm sewer inlets, repairs to sanitary sewer manholes and castings, hydrant and valve repairs. Street segments include: Karth : ake Dr (Pleasant Dr to Cul-de-Sac), Pleasant Drive (Amble to Karth Lake Dr), Pleasant Circle, Amble Drive (Karth Lake Dr to Lexington kvenue), Karth Lake Circle, Glenhill Road and Cummings Park Drive. Retaining wall rehab, BMP-Phase 2 and outfalls grit chamber additions. Justification ?avement conditions are showing distress with condition ratings from 33 to 62, with exception of one segment of Pleasant Dr. Pavement ;onditions will continue to decline. Proposed improvements are necessary to continue safe and reliable street and utility services. These mprovements will address the increasing costs for patching and maintaining highly deteriorated street pavement within the City. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 1,955,000 1,955,000 Total 1,955,000 1,955,000 Funding Sources 2024 2025 2026 2027 2028 Total Capital Improvement Funds 550,000 550,000 (PIR) Other 670,000 670,000 Other City Governments 30,000 30,000 Sanitary Sewer Utility Fund 135,000 135,000 State Aid 100,000 100,000 Surface Water Mgmt Utility 410,000 410,000 Funds Water Utility Funds 60,000 60,000 Total 1,955,000 1,955,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 52 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 28-Str-001 Project Name 2028 PMP TCAAP No Department Street Department Contact Public Works Director Type Improvement Useful Life 20-25 Category Streets: Reconstruction Priority 2 Very Important Description I Total Project Cost: $3,765,000 ?avement Management Program (PMP) improvements consisting of spot curb repair, resurfacing or full depth reclamation and new bituminous )avement, repairs to storm sewer inlets, repairs to sanitary sewer manholes and castings, hydrant and valve repairs. Street segments include: 3enton Way loop south of Harriet, Tiller Lane (Lexington to Cannon Ave), Cannon Ave (Tiller Ln to Dunlap), Dunlap (Cannon Ave to Tiller : ane), Ingerson Rd, Ingerson Ct, Hamlin Ave N (Hamlin Ave N to Ingerson Rd), Pine Tree Dr, Harriet Ave, Walden Pl, Lametti Ln, Lametti Ct, 3ussard Ct, Hunters Ct, Fernwood St, Fernwood Ct, Dellwood Ave and Carlton Dr. Dredging Fernwood sediment pond and adding grit chambers, )ipe lining dual storm crossing Hamline Ave N and 2-400 ft sanitary sewer 10-inch forcemain rehab. Justification ?avement conditions are showing distress with condition ratings from 15 to 59. Pavement conditions will continue to decline. Proposed mprovements are necessary to continue safe and reliable street and utility services. These improvements will address the increasing costs for )atching and maintaining highly deteriorated street pavement within the City. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 3,765,000 3,765,000 Total 3,765,000 3,765,000 Funding Sources 2024 2025 2026 2027 2028 Total Capital Improvement Funds 775,000 775,000 (PIR) Other 1,200,000 1,200,000 Sanitary Sewer Utility Fund 340,000 340,000 State Aid 350,000 350,000 Surface Water Mgmt Utility 950,000 950,000 Funds Water Utility Funds 150,000 150,000 Total 3,765,000 3,765,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 53 Capital Improvement Plan 2024 thYu 2028 Department Water Department City of Arden Hills, Minnesota Contact Public Works Director Type Unassigned Useful Life 10 Category Utility Maintenance TCAAP No Priority 2 Very Important Description Total Project Cost: $730,000 2024 - South Water Tower maintenance. Clean, inspect and repair tank interior of this 1 million gallon storage facility in accordance with MN Department of Health guidelines. 2026 - North Water Tower order inspection report. 2027 - North Water Tower maintenance. Clean, inspect and repair tank interior of this 500,000 gallon storage facility in accordance with MN Department of Health guidelines. 2030 - South Water Tower order inspection report. 2031 - South Water Tower maintenance. Clean, inspect and repair tank interior of this 1 million gallon storage facility in accordance with MN Department of Health guidelines. 2033 - North Water Tower order inspection report. 2034 - North Water Tower maintenance. Clean, inspect and repair tank interior of this 500,000 gallon storage facility in accordance with MN Department of Health guidelines. Listed costs are estimates only. Inspections will determine the extent of minor re airs required. Justification The MN Department of Health recommends that storage facilities for public water supply systems are inspected and maintained on a 5-year cycle. Last rehab on South Tower was completed in 2013 ($816,256). Next one due in 2038. Last rehab on North Tower was completed in 2018 ($608,125). Next one due in 2043. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 250,000 10,000 150,000 410,000 Total 250,000 Funding Sources 2024 2025 2026 2027 2028 Total 10,000 150,000 410,000 Water Utility Funds 250,000 10,000 150,000 410,000 Total 250,000 Budget Impact/Other 10,000 150,000 410,000 Produced Using the Plan -It Capital Planning Software 54 Capital Improvement Plan 2024 thYu 2028 Department Water Department City of Arden Hills, Minnesota Contact Public Works Director Project # 24-W-003 Type Improvement Useful Life 20 Project Name Water Meter Replacement & Lead/Co er Inventor P PP Y Category Utility Improvements TCAAP No Priority 3Important Description Total Project Cost: $1,425,000 ommercial water meters were replaced in 1997. Residential water meters were replaced in 2000. Meter Readers were replaced in 2012. This is a )laceholder for replacing them throughout the City. 625,000 budgeted in 2024 for consultant work. Justification Vleters are at the end of their useful life. qN Dept of Health requires a lead/copper inventory. Expenditures 2024 2025 2026 2027 2028 Total Other 525,000 900,000 1,425,000 Funding Sources Total 525,000 2024 900,000 2025 2026 1,425,000 2027 2028 Total Water Utility Funds 525,000 900,000 1,425,000 Total 525,000 900,000 1,425,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 55 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 24-W-004 Project Name Trunk Water Main Improvements - Roseville TCAAP No Department Water Department Contact Public Works Director Type Unassigned Useful Life 30 Category Utility Improvements Priority 2 Very Important Description Total Project Cost: $385,000 ?roposed trunk watermain upgrade to 1,600 feet of existing 12-inch CIP to 16-inch DIP or PVC. Located within the City of Roseville along 3amline Avenue from Josephine Road to Glenhill Road. Justification Phis upgrade is vital to support the future TCAAP development by allowing the future water tower to operate at appropriate water levels. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 385,000 385,000 Total 385,000 385,000 Funding Sources 2024 2025 2026 2027 2028 Total Water Utility Funds 385,000 385,000 Total 385,000 Budget Impact/Other 385,000 Produced Using the Plan -It Capital Planning Software 56 Capital Improvement Plan City of Arden Hills, Minnesota Project # 25-W-001 Project Name Water System Model Update TCAAP No Description onduct a Water System Model update. 2024 thrtt 2028 Department Water Department Contact Public Works Director Type Operational Maintenance Useful Life Category Utility Improvements Priority 3Important Total Project Cost: $40,000 Justification the last water model was conducted in 2019. Since then upgrades have been made at critical locations of the water distribution system. An update s needed to show current conditions. Expenditures 2024 2025 2026 2027 2028 Total Planning/Design 40,000 40,000 Total 40,000 40,000 Funding Sources 2024 2025 2026 2027 2028 Total Water Utility Funds 40,000 40,000 Total 40,000 40,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 57 Capital Improvement Plan 2024 thru 2028 City of Arden Hills, Minnesota Project # 25-W-002 Project Name Booster Station Improvements TCAAP No Department Water Department Contact Public Works Director Type Unassigned Useful Life 20 Category Utility Maintenance Priority 2 Very Important Description Total Project Cost: $150,000 Zehabilitation of pumps, motors, electrical system and building components. This project begins a proactive process to address aging mechanical ;quipment to minimize station failures and unscheduled outages. Staff will conduct further evaluation of system components to identify specific mnrovements and refine cost estimates in 2023. Justification the booster station is a critical component of the water distribution system to supply water to the northern portion of the City. Proactive •ehabilitation will better manage risks associated with water supply disruptions. Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 150,000 150,000 Total 150,000 150,000 Funding Sources 2024 2025 2026 2027 2028 Total Water Utility Funds 150,000 150,000 Total 150,000 Budget Impact/Other 150,000 Produced Using the Plan -It Capital Planning Software 58 Capital Improvement Plan 2024 thYu 2028 Department Water Department City of Arden Hills, Minnesota Contact Public Works Director Project # 26-W-002 Type Unassigned Useful Life 30 Project Name MN-51 Water & Sewer Forcemain Crossings g Category Utility Maintenance TCAAP No Priority 3Important Description Total Project Cost: $275,000 ?roposed replacement of watermain crossings along MN-51 at Glenhill Road (8-inch CIP), between Cummings Lane and Ingerson Road (8-inch IP), and near Red Fox Road (12-inch CIP). New watermain will consist of DIP or PVC. kpproximately 300ft (6-inch CIP) Sanitary Forcemain under MN-51 within MnDOT right of way. Justification the existing watermain material is CIP and over 50 years old. CIP is more prone to breaks as it ages compared to DIP or PVC. These crossings ire vital to supplying consistent water distribution on each side of MN-51. MnDOT is scheduled to resurface MN-51 in 2026. Expenditures 2024 2025 2026 2027 2028 Total Planning/Design Construction/Maintenance 35,000 240,000 35,000 240,000 Total Funding Sources 35,000 2024 2025 240,000 2026 2027 275,000 2028 Total Sanitary Sewer Utility Fund Water Utility Funds 17,500 17,500 50,000 190,000 67,500 207,500 Total 35,000 240,000 275,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 59 Capital Improvement Plan 2024 thYu 2028 Department Water Department City of Arden Hills, Minnesota Contact Public Works Director Project # 26-W-003 Type Unassigned Useful Life 10 Project Name Trunk Water Main Improvements Category Utility Maintenance TCAAP No Priority 2 Very Important Description Total Project Cost: $40,000 Evaluated the condition of 16" water main between North and South towers to determine the degree of corrosion and deterioration in 2020-2021. The evaluation will develop a long-term plan for rehabilitation of this critical water main segment. Inspection via ultrasonic testing is needed to evaluate existing conditions in critical locations along the Trunk Watermain. 2026 - Evaluation at Hamline Ave N near Ingerson and Dunlap St N near Ingerson 2028 - Inspections and testing at Dunlap St N near Grey Fox Road Justification The trunk water main extending between the north and south elevated storage tanks is one of the most important and critical segments of the water distribution system for supplying water to the northern portion of the City. Segments of the water main have been in service for more than 52 yeat Expenditures 2024 2025 2026 2027 2028 Total Construction/Maintenance 20,000 20,000 40,000 Total Funding Sources 2024 20,000 2025 2026 2027 20,000 2028 40,000 Total Water Utility Funds 20,000 20,000 40,000 Total 20,000 20,000 40,000 Budget Impact/Other Produced Using the Plan -It Capital Planning Software 60 City of Arden Hills, Minnesota Capital Improvement Plan 2024 thru 2028 PROJECTS BY FUNDING SOURCE Source Project # Priority 2024 2025 2026 2027 2028 Total Capital Improvement Funds (PIR) Hard Court Rehabilitation 24-Park-001 3 210,000 160,000 100,000 470,000 2024 PMP 24-Str-001 2 1,000,000 1,000,000 Park Shelter Replacements 25-Park-001 4 100,000 100,000 Playground Structure Replacement 25-Park-002 3 300,000 320,000 620,000 Cummings Park Roof Maintenance 25-Park-003 3 40,000 40,000 Hazelnut Park Parking Lot Improvements 25-Park-004 4 300,000 300,000 MN-51 Trail Connection 26-Park-005 n/a 500,000 500,000 2026 PMP 26-Str-001 2 550,000 550,000 Perry Park Improvements 27-Park-005 4 295,000 295,000 Lake Johanna Blvd Trail 28-Park-001 3 250,000 260,000 510,000 2028 PMP 28-Str-001 2 775,000 775,000 Capital Improvement Funds (PIR) Total 1,210,000 900,000 1,050,000 965,000 1,035,000 5,160,000 EDA General Fund Gateway Signs 25-EDA-001 n/a 270,000 40,000 310,000 EDA General Fund Total 270,000 40,000 310,000 Equipment/Building Replacement Fun City Hall Maintenance 24-Bldg-005 2 50,000 50,000 50,000 50,000 50,000 250,000 Trade in Program Toro Z Mowers #473 & #474 24-Eqo-001 3 30,000 30,000 60,000 Replace Bobcat Broom Attachment #475 24-Eqp-002 3 5,000 5,000 Replace Bobcat Forestry Head Attachment #464 24-Eqp-003 2 22,500 22,500 Emergency Generator Replacement Schedule 24-Eqp-004 2 145,000 145,000 Replace 2012 F-450 Dump Body/Plow Truck #441 24-EgpV-001 3 100,000 100,000 Replace 2012 Int'I Plow Wing Truck #115 24-EgpV-002 n/a 143,650 150,170 293,820 Replace 2013 Ford Escape #504 24-EgpV-003 n/a 32,000 32,000 City Hall roof 25-Bldg-002 3 160,000 160,000 Replace 1993 Case 621 Loader #103 25-Eqp-001 n/a 245,000 245,000 Replace 1996 Wacker 880 Roller #106 25-Eqp-002 3 24,500 24,500 Replace 2006 Felling Trailer #415 25-Eqp-003 3 8,000 8,000 Replace 2020 Bobcat Toolcat #461 25-Eqp-004 2 45,000 45,000 Replace 2013 Ford F450 Plow/Dump Truck #318 25-EgpV-001 3 95,000 95,000 Replace 2018 Toro Large Area Mower #457 26-Eqp-001 3 80,000 80,000 Replace 1996 Redi-Haul Trailer#108 26-Eqp-002 3 10,500 10,500 Replace 2016 F-350 wN-Plow and Liftgate #215 26-EgpV-001 3 65,000 65,000 Replace Bobcat Snowblower Attachment #467 27-Eqp-001 4 6,500 6,500 Replace 2000 Backhoe #204 27-Eqp-002 3 145,000 145,000 Replace 2009 Sterling Acterra Truck #431 27-EgpV-001 3 140,000 125,000 265,000 Replace 2016 F-350 Pickup w/Liftgate #455 27-EgpV-002 4 70,000 70,000 Replace 2015 Ford F450 Plow/Dump Truck #320 27-EgpV-003 2 95,000 95,000 City Hall Air Handler Replacement 28-Bldg-001 3 220,000 220,000 Replace Bobcat Snowblower 84" #118 28-Eqp-001 3 7,000 7,000 Produced Using the Plan -It Capital Planning Software 61 Source Project # Priority 2024 2025 2026 2027 2028 Total Replace 2009 Husqavarna Pavement Saw #113 28-Eqp-002 3 7,500 7,500 Replace 1998 Tow Behind Air Compressor #107 28-Eqp-003 3 33,500 33,500 Replace 2016 Stepp Asphalt Patch Trailer #121 28-Eqp-004 3 50,000 50,000 Replace 2017 Mack Plow/Wing/Dump Truck #123 28-EgpV-001 5 150,000 155,000 305,000 Replace 2019 Ford F-150 Ext Cab w/Toolbox #601 28-EgpV-002 3 30,000 30,000 Equipment/Building Replacement Fund 383,150 777,670 345,500 671,500 698,000 2,875,820 Total Grants Hard Court Rehabilitation 24-Park-001 3 110,000 110,000 Old Hwy 10 Trail - 96 to Valentine Park 25-Park-005 n/a 1,400,000 1,400,000 MN-51 Trail Connection 26-Park-005 nla 300,000 300,000 Grants Total 110,000 1,400,000 300,000 1,810,000 Other 2024 PMP 24-Str-001 2 1,000,000 1,000,000 2026 PMP 26-Str-001 2 670,000 670,000 2028 PMP 28-Str-001 2 1,20U00 1,200,000 Other Total 1,000,000 670,000 1,200,000 2,870,000 Other City Governments 2026 PMP 26-Str-001 2 30,000 30,000 Other City Governments Total 30,000 30,000 (Public Safety Capital Fund LJFD Engine/Ladder Replacement 24-Pub-001 n/a 449,940 234,240 684,180 LJFD Rescue/Command/Utility Vehicle Replacement 24-Pub-002 n/a 1,950 26,470 75,270 27,820 207,160 338,670 LJFD General Equipment 24-Pub-003 n/a 35,970 15,000 175,680 15,000 15,000 256,650 LJFD Station Capital 24-Pub-004 n/a 16,890 281,820 10,000 10,000 10,000 328,710 Lake Johanna Fire Dept Fire Station 26-Pub-005 n/a 140,300 280,600 280,600 701,500 Public Safety Capital Fund Total 504,750 323,290 401,250 567,660 512,760 2,309,710 Ramsey County Old Hwy 10 Trail - 96 to Valentine Park 25-Park-005 n/a 550,000 550,000 Ramsey County Total 550,000 550,000 Sanitary Sewer Utility Fund Emergency Generator Replacement Schedule 24-Eqp-004 2 155,000 145,000 300,000 Lift Station Rehabilitation 24-Sew-001 2 530,000 210,000 260,000 1,000,000 Sewer Lining/Rehabilitation 24-Sew-002 2 415,000 400,000 640,000 1,455,000 2024 PMP 24-Str-001 2 175,000 175,000 2026 PMP 26-Str-001 2 135,000 135,000 MN-51 Water & Sewer Forcemain Crossings 26-W-002 3 17,500 50,000 67,500 2028 PMP 28-Str-001 2 340,000 340,000 Sanitary Sewer Utility Fund Total 1,292,500 610,000 330,000 900,000 340,000 3,472,500 Produced Using the Plan -It Capital Planning Software 62 Source Project # Priority 2024 State Aid 1 Old Hwy 10 Trail - 96 to Valentine Park 25-Park-005 n/a 2026 PMP 26-Str-001 2 Lake Johanna Blvd Trail 28-Park-001 3 2028 PMP 28-Str-001 2 State Aid Total Surface Water Mgmt Utility Funds 2024 PMP 24-Str-001 2 400,000 2026 PMP 26-Str-001 2 2028 PMP 28-Str-001 2 Surface Water Mgmt Utility Funds Total 400,000 Trade -In Value Trade in Program Toro Z Mowers #473 & #474 24-Eqo-001 3 15,000 Replace Bobcat Broom Attachment #475 24-Eqp-002 3 1,500 Replace Bobcat Forestry Head Attachment #464 24-Eqp-003 2 2,500 Emergency Generator Replacement Schedule 24-Eqp-004 2 5,000 Replace 2012 F-450 Dump Body/Plow Truck #441 24-EgpV-001 3 20,000 Replace 2012 Int'I Plow Wing Truck #115 24-EgpV-002 n/a Replace 2013 Ford Escape #504 24-EgpV-003 n/a 8,000 Replace 1993 Case 621 Loader #103 25-Eqp-001 n/a Replace 1996 Wacker 880 Roller #106 25-Eqp-002 3 Replace 2006 Felling Trailer #415 25-Eqp-003 3 Replace 2020 Bobcat Toolcat #461 25-Eqp-004 2 Replace 2013 Ford F450 Plow/Dump Truck #318 25-EgpV-001 3 Replace 2018 Toro Large Area Mower #457 26-Eqp-001 3 Replace 1996 Redi-Haul Trailer #108 26-Eqp-002 3 Replace 2016 F-350 wN-Plow and Liftgate #215 26-EgpV-001 3 Replace Bobcat Snowblower Attachment #467 27-Eqp-001 4 Replace 2000 Backhoe #204 27-Eqp-002 3 Replace 2009 Sterling Acterra Truck #431 27-EgpV-001 3 Replace 2016 F-350 Pickup w/Liftgate #455 27-EgpV-002 4 Replace 2015 Ford F450 Plow/Dump Truck #320 27-EgpV-003 2 Replace Bobcat Snowblower 84" #118 28-Eqp-001 3 Replace 2009 Husqavarna Pavement Saw #113 28-Eqp-002 3 Replace 1998 Tow Behind Air Compressor #107 28-Eqp-003 3 Replace 2016 Stepp Asphalt Patch Trailer #121 28-Eqp-004 3 Replace 2017 Mack Plow/Wing/Dump Truck #123 28-EgpV-001 5 Replace 2019 Ford F-150 Ext Cab w/Toolbox #601 28-EgpV-002 3 Trade -In Value Total 52,000 Water Utility Funds 2025 2026 2027 2028 Total 850,000 850,000 100,000 100,000 1,490,000 1,490,000 350,000 350,000 850,000 100,000 1,840,000 2,790,000 400,000 410,000 410,000 950,000 950,000 410,000 950,000 1,760,000 15,000 30,000 1,500 Z500 5,000 5,000 5,000 20,000 20,000 30,000 30,000 8,000 15,000 15,000 500 500 4,000 4,000 25,000 25,000 25,000 25,000 20,000 20,000 1,500 1,500 15,000 15,000 1,500 1,500 15,000 15,000 25,000 25,000 10,000 10,000 25,000 25,000 2,000 2,000 2,500 2,500 1,500 1,500 25,000 25,000 35,000 35,000 15,000 15,000 99,500 41,500 96,500 86,000 375,500 Emergency Generator Replacement Schedule 24-Eqp-004 2 2024 PMP 24-Str-001 2 200,000 Water Tower Maintenance 24-W-001 2 250,000 Water Meter Replacement & Lead/Copper Inventory 24-W-003 3 525,000 900,000 Trunk Water Main Improvements - Roseville 24-W-004 2 385,000 Water System Model Update 25-W-001 3 40,000 Booster Station Improvements 25-W-002 2 150,000 145,000 145,000 200,000 10,000 150,000 410,000 1,425,000 385,000 40,000 150,000 Produced Using the Plan -It Capital Planning Software 63 Source Project # Priority 2024 2025 2026 2027 2028 Total 2026 PMP 26-Str-001 2 60,000 60,000 MN-51 Water & Sewer Forcemain Crossings 26-W-002 3 17,500 190,000 207,500 Trunk Water Main Improvements 26-W-003 2 20,000 20,000 40,000 2028 PMP 28-Str-001 2 150,000 150,000 Water Utility Funds Total 1,377,500 1,090,000 280,000 295,000 170,000 3,212,500 GRAND TOTAL 6,329,900 6,870,460 3,958,250 3,535,660 6,831,760 27,526,030 Produced Using the Plan -It Capital Planning Software 64 M O N f0 O N o 0 0 i i M O R p O h a M N o 0 O° O h '° M 0o O W yMj O O � M N O M O N O O O) N ^ h h M N vi O fD i i i i O N t0 N - i i i i i i i i i i R c 7 M O N (O N fp T N N W M O 47 N O O m M N e a O O O O O i n O V O O l0 H - O O a O O O O N p 0 p In O O O i i i i i i i i O h O i i 0 O O � 00 O O v O N In w O M M v � N O N N � o O o O M M N O o O M N M N N � N o 0 0 0 o 0 o O O N a N N � 1p C N W b a M O M M M N O O O O 7 M O O O O O cr! o ' o o O ` O i i 0 i i . i i . M i i . i i . i N O O W O W O N N O N N Of t � M ui Ld - O m o o O O O 9 Lo LQ o O 9 0 O ` O 0 M N O o V � a IOG M N O N W {p7 IA 00 00 O 0 O i Iz 1� i V O °i O P N h N o O GD N Is f0 N Ov O O O O O h - O N O^^i N" O h O M M O W N V OO M h o h y o h h h y � m c Z N - LL N C 1 LL i42 C i E W m N = d Q o 2 p> a p W O N fn rn W K d C p C A o m 00 a z rn m E d y o m E N > U £ T x ¢> ¢> 3 y R ciLu — !9 m c v m ❑ H - y J C9 H H 2 ¢ IL a s d 2 a O N ¢ O J O N N N N N N F (-1 W LO co R R R R K R R K R s a Q suo!iiiW 3 1p Q = u ~ m C o F � � � 3 � � c 7 O W � N O N N N o N N a M p�j M � a tM0 N a l0 0 o OO O O o OO O O o Oo O 00 O ^ p O O 0 v p In 0 r M O O p Qi O o v In o N (p C> O a w M n M a Q� v N N V N O N h U Z C Z p V a ID O OO O O o ^ M M (D uo N m rn N c C O a O -_ £ w h > w = o > O_ > �o £ 4 L O m Q o« w O m m U L) j c O m � - � c u s o d a d m C8 y N W k - m C - T - W C C U W A �t � 3S Dl Dl spmsnogL m N N I� N O N �[ of C b M o �ri o O O O O O h O O O ui o 0 of (O Is 'd ^ O O h p hj It .�... N �m ' Is Is C4 o Q) ' rn 7 O M to co o CO 4m M ai m 1p M Q N N N y G OI OO 00 OO O e�� n M N m c N Z m L LL N y C 1 LL c C O d o N v y W N > C C a G LL ry 70E mE Q N d Q 5 W t a O o 9 C m a y= m m a c m u m E E y d c si m m o? > a x C m = � J " d E -a c r_ u .3 H = gym„ H m 'o m H H a 2 25> w 0 Lou s a sx x tt , spmsno4L 00 co N M O N N a O N N 10 UJ V N M N O O O O 0 0 N N O O 0 O O � O O o O O N O O ui C ui 0 N `p N o A a .... N tAp A p O O O O O 0 O O O O O O M N o m O O a v M p A N p o N N N O a N O � 00 OOi ` O O V7 N Irp M O U) N tpo N O 00 00 p0 N O O O O .N. N W FO r N � N �B .... A O�1 O O O O O O O O O O O cccli 0 Q A N R O O O Fi O O O N ry OI O O O N N O a N tOp O C, n � f00 N CD M � h r N ` M O O O v O co N N W (0 � o) U) N M O O O O O O O O A O A M M M M N M p i O H n N W N p N N N N N N O SUOIllIyy M y 0 l0 c Z 7 N � LL N N c a LL o E ac O 'o v d W N v > LL , U d o 'EOE Q Q N s N > Y y p W O o c c _ LL S U V V' o I m E O y i6 � v E � a o •• c u d u m C E � C U W U N C LL C A V_ N _ C m m N p J J J J p L w C � w U) m a Q c Z m O LL a C LL O y d W _ 'O c C G '0` dQ �° W C U U O O U) N On O O O O O N N i 00 i i M 00 M O W ac N N ` 00 N n O N O n O) O N N .N,.. N n o 0 o n 0 0 OF o6 c n O O O n m o V O o0 0 o O pp (p (O M N O Qf N N O O N r V7 V N N ` N n O o O n a rn o 0 ro n v CNO N N N O O Ol 00 O co N N .N. N N o p n pnj o OI allo O O OO O OD 00 00 i i h 00 N f� O N O _ H OI N (O .N.. =. " O O W O N G O tp o io 0 o n Oo h o M M A A N n N W n a M w N ro CO a rn N N ` N O O O O On y O R O O O O V p O O M O N N N M Of h N N N N N � O N w M M 00 00 i i i i i i rn O O 7 O n O N D n C N u OD N N ` NI o o 0 0 0 o h o (00 WM lc O N h M (z M Lry K N � M V M GD i O N O O O r O of N 03 t6 o ui U Oi N 3 3 3 m v a+ m v a+ m c 0 W h h h 10 y h 10 y h �! si a tOo N O N W O O O O � a Q NCR A# raffia scar as suoplipy N d N O E V) a V O inEl C o C o 3 d c c ui rn 3 o % 9. 0 0 y N of o o m O C7 F ctO.i rci _ W J iq 2 0 0 N N N N N O O O f U W _ rL 2- O r- y m c Q c Z y Ci LL a c LL m O v d W _ h = O c C G a E Q Q r° W C V U V � y p N N p M cc CAD_ w M M N v C W OI O O ` A N O N N N M O OI O O p 7 N t00_ CO ai aD N M A0 O c r N O t00 tp (AO. 00 p ONE r Y N o O n � o 0 0 0 01 O O rn O O06 O A CD N T O N M O O) `. �, O ao N t0 ol p 7 Of 00 rn o 0 0 N p O 0 o h p N 7 t0 O O O O O O ty i m 00 i . . i N p O N O O N O O O O O O N M N rn m M laD r N N N o p Ci r r M v 7 ` a v O V) h h V) h h V) h is r N a � R M W N p � a CD N n � A N Lo a A w a suogllW y d N N o a LL ` E o rn o Z N C CD + + (yj O W > IL C m A C O ]�•, E I Lu c £_ E o 0 0 o 00 O C7 ¢ 20 n N N n N r`n° O H H 10 LOU _ rL n y m c Q c Z m A LL a c LL O y dW to _ 'o c C G 'EoE ZQ Q .�+ W C U U O O y N O O O N vv M tp f�0 p j 00 M N IIR OND � cN0 O rn O O � V 10 M M M ` M m o O� N N o o o 0 o N M N O_ O a N� 000 Cl! . . O O O . . . . . . .. . . . . ^ N r V O o M O r M N O N pp O O O M O i 00 00 i i vi of Cl) O o f� n N M N ` ` M i M M .N.. M pi O O O) i i O O i i i i i i i N O O O O Ci a N N N v) O A M M M oo oo rn M o Cl! O O N N O O O O N N O N p oo h o cM0_ Or1 O h g oo h a N u) r O N O O N _ OD O o O O W O O Of N h O � I� ` ` N M M ` N Hi O O V) i i o 0 0 0 o O . i i . i N OD O O O O O ri O M M O N N ` M M Mo M N M Y) N 0i o 0 o O o uoi O o O Y1 O O O N N W V) O h O N h N O 7 W 01 W N .N.. .N.. .M.. .0.. O) f0 N N h I N v o O I I� N I Cp N w v� Ao h v� Ao h 3 3 3 3 3 3 N O Ci C N N iB R C9 N N O N SL SL A A A A A A St St uopllW N w O E V) a E LL � L w w w m N O N y + C E o m N NN w c v O U C w w w W w O N cv E 3 c y W m m O 0 5 E c E c .9 N C A n' cwi w v io 3 �' y a w K L y v a�i a a a a a m 3 v _ W p� Ol m ` N N N N o to E m 00 w O C7 G F E o W O N 0 0 0 0 o z N N N N 3 m H 2 3 o O H H t V c W rL o N 1- Attachment C 2024 differences Genl Fund Cable Deputy Clerk allocation change 8,260 Comm Coord allocation change 25,740 (19,000) Comm Coord pt to ft 36,940 12,740 Step increases 18,660 310 3% estimated COLA 45,600 1,200 EE Ins benefits (10% health; 4% dental) 18,090 410 Work comp insurance 12,790 90 Personnel costs 166,080 (4,250) Council retreat/strategic planning 10,000 NYFS 23,000 Comp study (one-time cost) 17,500 Property insurance 20,250 Election services 8,950 Ordinance update (2024 & 2025 cost) 40,000 Sand & salt for roads 10,000 Pavement condition survey 20,000 Ramsey County Sheriff 175,410 UFD 162,330 Work session tapings 5,000 Newsletter 51400 Cable costs to Genl Fund 50,000 (50,000) All other misc (9,680) (220) TOTAL 693,840 (44,070) AGENDA ITEM — 3F 'r -731�EN HILLS MEMORANDUM DATE: July 17, 2023 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Assisted Hearing Technology Budgeted Amount: N/A For Council Consideration Actual Amount: N/A Funding Source: N/A Council should consider providing direction on whether or not to move forward with additional action on Assisted Hearing Technology for the Council Chambers. Background At the March worksession, Council decided not to move forward with assisted hearing technology improvements in the Council Chambers. Budget Impact Budget impacts will depend on how Council wants to move forward. Attachment Attachment A: Memo on Assisted Hearing Technology Page 1 of 1 Attachment A -731�EN HILLS MEMORANDUM DATE: March 20, 2023 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Assisted Hearing Technology Budgeted Amount: Actual Amount: Funding Source: N/A $8,586.42 Cable Fund For Council Consideration Council should consider providing direction on whether or not to move forward with assisted hearing technology modifications to the City Council Chambers. Background Staff was previously directed by the City Council to move forward with securing a proposal to add a T-Coil System to the City Council Chambers to assist people with T-Coil enabled hearing aids. The cost for the implementation was estimated around $25,000. Since that worksession, Staff had worked with NineNorth on having Electronic Design review the Chambers and put together an actual contract for work. During their review, they noted a "hum" in the Council Chambers that they cannot mitigate. This hum would likely interfere with a T-Coil system and is no longer their recommendation. As a secondary option, they have proposed a Wi-Fi system. This system would work in tandem with someone's smart phone, but a user could also use a T-Coil Neck Loop that would be compatible with the system (example below). A normal user would need to download the specific app for the system used in the Council Chambers, the signal would be transmitted from the Wi-Fi system to the phone and from the phone to the hearing aids. Or if a person had T-Coil hearing aids, they could wear the neck loop and pick up the audio. Page 1 of 2 A third option would be to use existing equipment, and anyone could request a hip -pack to be used during Council meetings. Although we do have a sign noting hearing equipment is available in the Chambers, we could make a larger, more obvious sign alerting people that equipment is available upon request. It should be noted that this equipment is only facilitating audio that is directly going into microphones on the dais or elsewhere in the chambers, normal conversations held in the chambers would not be picked up by this system (or any other system). Budget Impact The revised proposal for the Wi-Fi system is $8,586.42, this amount would be paid by the Cable Fund, and is not currently budgeted. Future changes are going to be needed in the fund regardless if this project moves forward or not to keep the fund solvent. Attachment Attachment A: Electronic Design Proposal Page 2 of 2 Arden Hills Council Chamber Assisted Listening System City of Arden Hills 1245 Hwy 96 W Arden Hills, MN 55112 Presented By: Electronic Design Company 3225 E Hennepin Ave. Minneapolis, MN 55413 US 612-355-2300 http://www.edcsolutions.com/ Project #: 6-Z-9004 Revision: 0 Modified: 2/16/2023 ELECTRONIC a DESIGN. O www.EDCSOLUTIONS.com Electronic Design Company (EDC) is pleased to provide the following quote. The sections below outline our proposed design assumptions, scope of work, responsibilities of both EDC and the facility, project costs and our general terms and conditions. Thank you for considering Electronic Design Company for your project. We look forward to working with you on this project and in the future. Scope of Work: • EDC to provide, configure and install a Wi-Fi-based assistive listening system for the council chambers. • A streaming server and network switch will be installed in the equipment rack in the AV control room adjacent to the chambers. • A Wi-Fi access point will be mounted on the wall in the chambers, on the wall that is shared with the AV control room. This can be mounted high up, above the dropped ceiling level so that it is out of sight (for the most part). A single CAT6 cable will be routed from this device back to the network switch in the equipment rack. • The streaming server will be connected to the network switch and have one input from the client's existing Symetrix DSP. This output will be configured and controlled by the client, as they have full access and programming capability to the DSP. • The access point will be configured for the task and a name for the Wi-Fi network that is created will be dictated by the client (e.g., "Arden Hills Council Audio"). • Four Wi-Fi receivers will be provided and connected to the streaming audio service. These receivers will each have a traditional set of headphones and a neck -loop for using it with T -coil hearing aids. • Training will be held with the client's representatives to instruct them on operation, basic troubleshooting, and maintenance of the system. * Price Includes Accessories Design Exceptions / Notes: • Previous information indicated a hum coming from an electrical source. EDC investigated the hum but could not track it to the source. Best advice is to install a Wi-Fi system that would not be affected by this electrical interference. Cost of tracking down the source of the hum is hard to estimate and could become costly. • All network devices are programmed and fully tested at EDC on a dedicated and self- contained network using managed network parameters as provided by the Owner prior to installation. Additionally, EDC will provide all relevant network settings to the Owner's IT department if the newly provided audiovisual system is to reside on or is converged with the Owner's network. EDC is not responsible for troubleshooting the Owner's network or for delays due to integration issues beyond the project's contracted time allotment. If additional time is required, the Owner will be charged at the current hourly rates in the form of a change order. • It should be assumed that any equipment not designed by the manufacturer for mounting to the building structure requires stamped rigging drawings from a certified structural engineer. Unless otherwise stated, Electronic Design Company (EDC) has not included stamped equipment rigging drawings in this proposal and they are the responsibility of the Owner. However, EDC can facilitate in the design of a rigged system or provide drawings at an additional cost, upon request. Electronic Design Company shall: • Provide and install all equipment as designed. • Provide and install all wire, except ground wire. • Provide all final connections at system head -end. • Perform check-out and testing of system being installed. • Provide the owner with manuals and instruction. • Provide five-year warranty on parts and labor. Client or their Subcontractors shall: • Provide and install all ground wire. • Provide analog audio output from the DSP to act as input to the streaming audio server. Client will be responsible for configuring this output within the DSP. • Furnish electricity to head -end equipment as specified. • Electrical service for operation of this system, as well as conduit and high voltage cable, is NOT included in this quotation. Electronic Design Company will not be responsible for lost time or delays due to other parties or failure to gain access to work areas or systems. Unless other hours have been negotiated, all work will be completed during the normal business hours of 7:00 am and 3:30 pm; with the exception of normal holidays. Scheduling is subject to available personnel and product availability. Extra charges will be incurred by the customer if the project needs to be completed sooner than what is stated in the contract. ce Includes Accessories Terms & Conditions: Price is good for 30 days and includes applicable taxes. Price is F.O.B. job site. Terms are detailed on project summary page. The design and/or intent of the above listed system specification is owned by Electronic Design Company and will not be disclosed to any party other than those intended by Electronic Design Company. Disclosure of this design/intent will subject the proprietor to consultant fees equivalent of 10% of the above listed design/build quotation. All materials guaranteed to be as specified. All work to be completed in a competent manner according to standard practices. Any alteration or deviation written or verbal from the above specifications involving extra costs will be executed and will become an extra charge over and above the quotation. All agreements are contingent upon strikes, accidents, or delays beyond our control. Thank you for considering Electronic Design Company (EDC) for this project, we are pleased to be of service to your organization. * Price Includes Accessories (1) EDC : Engineering Engineering (1) EDC: Programming Programming (1) EDC : Project Manager Project Management (1) EDC : Training Training (1) Listen Technologies : LA-167 Replacement Cushions for Stereo Headphones (10) (1) Listen Technologies : LA-304 Assistive Listening Notification Signage Kit (1) Listen Technologies: LW-10OP-02 Listen EVERYWHERE 2 Channel Wi-Fi Audio Server (4) Listen Technologies: LWR-1020 Listen EVERYWHERE Wi-Fi Audio Receiver 1020 (1) Luxul : SW-100-04P 4 Port Unmanaged PoE+ Switch (1) Luxul : XAP-810 High Power AC1200 Dual Band Wireless access points (1) Travel: Travel Time and Expenses * Price Includes Accessories Client: Patrick Cook Date Contractor: Electronic Design Company * Price Includes Accessories Date AGENDA ITEM — 3G ,-ARZEN HILLS MEMORANDUM DATE: July 17, 2023 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: TCAAP Public Engagement Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A For Council Consideration Council should consider providing direction on a future public engagement session surrounding TCAAP. Background At a previous City Council meeting, the Council directed Staff to bring back a discussion on TCAAP public engagement, it was to be done following coordination with the County. The JDA met on July 1 lth and discussed public engagement (see Attachment A). The JDA is aiming to have a large public engagement event in October. The event will be conducted by a professional consultant and funded by the County. While this event will be focused on the project as a whole, it will delve into many of the elements related to the City, and provide a comprehensive overview for those not familiar with the project. Should Council want to hold a separate event, Staff would recommend holding it after the JDA event, if Council feels it is still needed. By having it afterwards, the JDA event may answer questions that residents have and help to educate the public in -advance of a City event. Budget Impact N/A Attachment Attachment A: JDA Memo on Community Engagement Page 1 of 1 Attachment A Joint Development Authority -A EN HILLS RA M S EY -' TCAAP 1 Redevelopment Project COUNTY p AGENDA ITEM 4 MEMORANDUM DATE: July 11, 2023 TO: Joint Development Authority Board of Commissioners FROM: Directors Collins and Perrault SUBJECT: Community Engagement Planning The JDA has expressed interest in hosting community engagement sessions. The goals, topics, format, and timing of these sessions is up for discussion at this work session. The attached document outlines a proposal for a potential fall community engagement event. This proposal is intended to be a starting point for discussion and will be revised based on feedback provided in this work session. Attachment: RCC Community Engagement Proposal 2023 Action Requested: Decide on goals, topics, format and timing of future community engagement session(s). Rice Creek Commons Community Engagement Proposal 2023 • Topic: Reintroduction to Rice Creek Commons • Timing: September/October 2023 • Goals: o Engage with Arden Hills residents — particularly new residents and those historically not involved with the project o Familiarize the public with the Master Plan and TRC o Provide updates on project status and schedule • Format o Brief presentation ■ Presenters: ■ Topic: o Open house: stations with experts available to answer questions • Topic Stations o TCAAP Redevelopment Code and Master Plan ■ Representatives: City staff, Alatus ■ Materials: TRC, Master Plan o Housing ■ Representatives: County CED, Alatus ■ Materials: visuals of possible housing types, visuals of density figures, table with AMI and rent levels to discuss affordability o Parks and trails ■ Representatives: County Parks & Rec ■ Materials: o Roads, traffic, and transit ■ Representatives: County Public Works, Kimley Horn? ■ Materials: o Environmental status ■ Representatives: Bay West ■ Materials: o Green energy ■ Representatives: Xcel Energy, Evergreen, Energy Advisory Committee rep ■ Materials: Energy Integration and Resiliency Framework o Outlot A (if end user selected by then) ■ Representatives: County CED ■ Materials: RDI materials, proposal concept • Feedback opportunities o Paper survey o Representatives at each table asked to write notes about conversation topics, common questions, themes to report back to JDA AGENDA ITEM — 311 ,-ARZEN HILLS MEMORANDUM DATE: July 17, 2023 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Council Tracker Update Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider The Council should provide further direction on items presented on the Council Request Tracker. Background City Council will receive a verbal update on items the Council has previously directed staff to research and/or bring forward. Discussion N/A Budget Impact N/A Attachments N/A Page 1 of 1