Extract of Minutes of Meeting
of City 'Council
City of Arden Hills
Ramsey County, Minnesota
November 27, 1978
Pursuant to due call and notice thereof, a regular meeting
of the City Council of the City of Arden Hills, Minnesota, was
held in the City Hall in said City on Monday, the 27th day of
November, 1978, at 8:00 o'clock p. m.
The following members were present: Acting Mayor Woodburn
and Councilmen Crichton, Hanson, and Wingert; and the following
was absent: Mayor Crepeau
Also present were: Charlotte McNiesh, City Clerk Admini-
strator; Don Lamb, City Treasurer; Don Christoffersen, City
consulting, engineer; and Peter S. Popovich, City Bond Consultant.
The City Clerk Administrator presented an affidavit showing
publication of notice of. hearing on proposed Improvement No.
SS-W-P-ST-78-3 in accordance with the resolution adopted
October 30, 1978, which affidavit was examined and found to be
satisfactory and was directed to be filed by the Clerk Admini-
strator. The City Clerk Administrator also exhibited a Cer-
tificate of Mailing Notice of Hearing to all affected property
~ owners, which certificate was examined and found to be satis-
factory and was directed to be filed by the Clerk Administrator.
1
,
All persons present were then afforded opportunity to be
hear d. and the names ahd addresses of the persons appearing and
4It heard by the Council, and the substance of the views presented
by them were as follows:
MR. DON CHRISTOFFERSEN, city consulting engineer: This is
for proposed Improvement 78-3, Karth Lake Estates West. As
indicated on the screen - the boundaries of Karth Lake Estates West -
this is the southerly line, this is Amble Road in this vicinity,
and this is the extension of Nursery Hill Road as constructed today.
This is the north line of Karth Lake Estates West, and the south
line. The west line is here, and the east line is Karth Lake.
The streets proposed in this development extend from the
existing street at this point to a semi-cul-de-sac running
westerly to a cul-de-sac, and another street going southerly to
Amble Road. The street is proposed to be 34 feet in width,
designed for less than 400 vehicles per day, 7-ton load street,
will have bituminous surfacing and concrete curb and gutter.
The sanitary sewer proposed to serve the development would
be constructed (inaudible) a manhole on the westerly portion of
the cul-de-sac, running easterly to another manhole, and southerly
to the sanitary sewer. Also, a (inaudible) would be constructed
from a road here to intercept this sanitary sewer. Sanitary sewer
will serve the abutting lots.
The watermain proposed will connect to the existing water-
main at this point, follow generally on the north side of the
street, and terminate at this point. Another stretch of watermain
would loop the Nursery (inaudible) and connect to the Amble system
and connect at Amble Road.
.
Storm drainage improvements are as shown on the southerly portion
of the street generally, draining to a detention basin and outward
to an existing storm sewer and on to Karth Lake. You will note
that we have provided inlet points for the basins, or the swampy
areas to the south, as an assurance that the basins will not be
overflowed and flood the newly constructed property. It is not
the intent of these outlets to drain the ponding areas, but to keep
them at a normal level. Also, we have one constructed in this
position. Storm sewers are located in this position. (Inaudible)
and storm sewer running to this point and draining back to the
detention basin, and one from this point over, and also into the
detention basin, and then out into Karth Lake. '
We find that this project is a feasible undertaking, and
recommend it be constructed as proposed.
2
.
i
i'
E
f
re
I
,
"
Mr. Popovich will cover the financing. I might add - on the
financing portion of it -we have utilized a lot basis, and for
the worst condition, we have assumed there were 17 lots that could
be assessed. As the Council is well aware, you have flexibility
in assessing, and it may be discussed at this time, but for our
feasibility study we used 17 lots. There may be more.
ACTING MAYOR WOODBURN: Mr. Popovich, will you explain the
methods and meaning of possible financing.
MR. PETER S. POPOVICH, city bond consultant: The total
published cost of this project has been rounded off to $200,000
and, of course, based on a per lot charge. As you know from the
plat, there are some 20 lots on the drawing. Mr. Christoffersen
feels if you eliminate Lots 1, 2 and 5 - 1 and 2 are on the north
part and 5 is where the pond is - then that would be some 17
remaining lots, and dividing that by $200,000 will come to
$11,765 per lot. On the other hand, if you extend the project from
the southern portion of Karth Lake Estates down toward Amble '
Road, or old vacated Highway 51, there's a thought there would be
two additional lots that could be assessed because of benefits
they'd receive there because of the road being extended. That
,would give a total of 19 lots and the approximate cost per lot
would be $10,526, or roughly $1200 per lot less going from 17 to
19 lots. It's proposed this be 100% assessed and be spread over a
20 year period with an 8% carrying charge and a right of prepayment
as has been the customary policy of the city.
I think the big question is to determine the extension of the
street to the south and whether there would be two additional lots
and the assessment of those besides the viability of 1, 2 and 5.
5 is quite obvious. There may be a question as to I or 2 and
maybe Don can address himself to that.
ACTING MAYOR WOODBURN: Mrs. McNiesh,. any writ ten comments?
MRS. MCNIESH: There are none.
ACTING MAYOR WOODBURN: We will open the hearing now to
questions. I will start first with questions from the council
and comments from those who may be interested.
MR. POPOVICH: I should point out one factor. The original
matter was 100% petitioned for and referred to the engineer, and
it was the additional land to the south that required the public
hearing. If it had stopped, you could have ordered the improve~'
ment without a public hearing so I assume the people that petitioned -
we have received nothing that they have retracted any of those
petitions - so that's a proper assumption for you to make and
we should address ourselves to that area to the south as to how
those property owners feel.
3
.
MR. CHRISTOFFERSEN: There's one other thing I'd like to
clarify. There's a lot abutting the proposed street on this side.
The one on the other side I believe is tax delinquent, but the
first one mayor may not be added in the per unit charges.
They're getting sanitary sewer and water from Amble, but may
receive a benefit from this portion of the street. Also, the
reason that I deleted Lots 1 and 2 from the total assessment is
because this configuration is slightly different from what was
platted in the Karth Lake Estates, and I believe they're
replatting and changing the configuration of the lots. There were
services there under the Karth Lake Estates Improvement and that's
why they were deleted in this one.
ACTING MAYOR WOODBURN: You mean this could be assessed -
the southernmost lot?
MR. CHRISTOFFERSEN: This would be an option up to the Council
whether they would like to apply an assessment or feel these
people receive a benefit from the street.
ACTING MAYOR WOODBURN: I'll have the Council make their
comments or ask questions.
COUNCILMAN CRICHTON: I have four questions of Mr. Popovich.
In the costs that are estimated, is the cost of acquiring the land
for that road included? I realize there's a tax forfeited land
at the bottom.
MR. POPOVICH :We 1Dok Don' s figures and rounded them off.
MR. CHRISTOFFERSEN: There are contingencies to allow for
normal (inaudible) so it should be covered.
COUNCILMAN CRICHTON:
which deals with the whole
that would be filled.
Mr. Christoffersen, One more question
area. There are two ponds - "c" and "F"
MR. CHRISTOFFERSEN:
Yes.
COUNCILMAN CRICHTON: I seem to recall in the last year or so,
one or ,possibly two ponds just south of Amble Road in the same
drainage system that you felt should not be filled. Is there some
reason?
.
MR. CHRISTOFFERSEN: They're also tied in with this network
of drainage. I can show you a ,better picture.
COUNCILMAN CRICHTON:
with the drainage system.
These can be filled without tampering
Why couldn't those?
MR. CHRISTOFFERSEN:
we didn't have an outlet
could be filled provided
At the time we were
for this other area.
adequate drainage be
discussing those
It's possible they
included.
4
.
COUNCILMAN HANSON: I'd like to have the engineer refresh
my memory as to why we decided to extend that connecting road
south from Nursery Hill.
MR. CHRISTOFFERSEN: Might I ask Mr. Miller to explain
that because he was involved in all of the Planning Commission's
work and I was not. I did not attend those meetings. Perhaps Mr.
Miller could provide a better answer than I.
MR. ORLYN MILLER, Wehrman, Chapman Associates, City Planners:
There were basically three options expressed at the time of the
first proposal- and maybe DOn might want to help me with this.
(Showing diagrams) In terms of lqt layout, this is basically
the same with some modification. The concern is Nursery Hill
Lane extends to Hamline on the far left and it would create a cul-de-
sac of approximately 1700 feet. The Ordinance limits the extent
of the length of a cul-de-sac to 500 feet (inaudible) 18 lots are
served, in which case it could be somewhat longer. In this case
it's substantially more than 18 lots. I believe something of that
nature is already served by Nursery Hill Lane. There was con-
cern expressed by ourselves and by the Planning Commission that we
search out a way to resolve the circulation problem (inaudible)
that length of cUl-depsac. Three different basic options were
open. One is to accept - by waiving that requirement at the time
of planning - to accept a longer cul-de-sac. Another is to
plainly deny any development in which the city gets in somewhat
of a vulnerable position in that this area is (inaudible)
landlocked by past decisions and we felt we should seek out some
way to provide for development for the benefit of the developer
as well as the city, and the third option was to seek some way to
provide a loop system to Hamline or Amble Road, so we did look at a
variety of ways.
Obviously, as you can see on the left $ide of that, the
existing homes and the spacing,is such that it would require taking
of the developed lands, lots that are already developed. We had to
seek out other ways, trying to determine where same of the openings
might be.
.
There was, at one time, some sort of easement here that showed
up on the plat. We did clarify that it wasn't as public as we
thought at the time we did these studies. That there is some
kind of access easement back here but not a platted street, but we
did look at the possibility of extending over there - providing
access to Amble Road at the end (inaudible) existing home con-
struction, there is a home on this lot at this time and the
narrowness of the area just made that somewhat infeasible.
This configuration simply shows how the Amble property which
gets landlocked in the process of creating a road (inaUdible)
however, if we put it here ,we still had this landlocked property
here that could not be subdivided efficiently to get access in that
manner.
5
.
.
This way we were just looking at (inaudible) might
provide some access for some additional lots that way. It
certainly did not reflect the best road layout (inaudible). We
would gain nothing relative to the cul-de-sac lane. In fact, it
would be greater, but if this were cut off at this point we would
have gained access to Amble property for potential future develop-
ment which would have been a more desirable (inaudible) the two
owners combined in a plat to resolve the entire problem in the
area. We encouraged them to do that, but have no power to force
that situation.
We then looked at some of the options of carrying through
and all we ended up with in the final analysis was just a hybrid of
this (inaudible)access agreement here that could apply to a third
lot. We were just studying some (inaudible) al ignments to develop
which would reflect the best circulation. It was our intention
to design a system that would not encourage traffic, but provide
another outlet. Those two are basically the same with minor
variations, and yet another would have, in this manner, served the
Amble property with the potential of creating four lots instead of
three by bringing the right-of-way down so it could be expanded
into this property, or constructing the cul-de-sac on this, but
providing by land trading something that would have been required
that both owners enter into the plat at this time. Of course,
that didn't happen so the final we ended up with is what you were
looking at first.
Basically, to reiterate the three options, to accept the
long cul-de-sac, which I pointed out is not the only one like it
in the city although it's not in a situation where we have an
abundance of those nor should we - there's one on Oak Avenue
that's serving a similar amount of lots, somewhat less, but over 18.
There are other longer cul-de-sacs beyond 500 feet, but not too
many of them serve beyond the 18 units. That being one option.
The second is to just not. allow it to develop until a
variety of property owners could get something together, and the
third (inaudible) to force a connection somewhere. This seemed
to be the most logical.
COUNCILMAN CRICHTON: I think Oak Avenue was installed before
the (inaudible).
MR. MILLER: That could be.
COUNCILMAN HANSON: One other comment. These alternatives
that have been presented on the slides, none of which showed
Nursery Hill Court ever going directly out to Amble?
MR. MILLER: No. No, because we eliminated that option because
of the developed lots and we pursued this other - first the one
far on the right to the end of Amble Road because we thought
there might be part of a right-of-way there, and when we found out not,
then we pursued this route because there was the tax delinquent
6
.
property which made that available for a good part of the extra
right-of-way needed and so we had only one other property owner
to deal with in this case, and it was not developed property.
That was a key factor, that it was not developed.
ACTING MAYOR WOODBURN:
If you have any comments or
name and address.
The meeting is now open for comments.
questions, could you rise, state your
MR. ARTHUR FREICHELS, 1292 Nursery Hill Lane: Are the lots
there the only ones to be assessed for the improvements?
Because I live on Nursery Hill Lane and I do have a letter.
MR. CHRISTOFFERSEN: The let 'Ers that were sent out to people
on Nursery Hill Lane were for informational purposes, and I doubt
they would be assessed for this improvement.
MR. POPOVICH: The legal description was broader, and the
notice went out to more people than the existing lots that we
have been discussing. It's broad enough and, as you know, when
you order an improvement if there were some benefit to these other
people then obviously you could consider the assessment, and that's
one reason why they received the notice. On the other hand, there
was no intention in our presentation as we saw it, and as the
engineer saw it, to assess anybody other than the particular lots
we have addressed ourselves to.
.
MR. CHARLES AMBLE, 1211 Amble Road: First of all, I would like to
straighten out the record. Somehow or another I was construed
as saying - making some remark to the effect that people on
Nursery Lane.were objecting to this entry on Amble Road. I did
not say that and I did not mean that. I appreciate all the effort
that was put into this thing by the engineers here, but somehow
I feel that this strip ,of land,- I would like to have the second
slide that you have up there. This particular strip of land in
here is a wooded section that I feel is being abused. This road -
proposed road that you have going through here will reduce this
from a five-lot plot to a three-lot plot which is a considerable
loss, plus the fact you're landlocking it, or arranging it in such a
way to also reduce its value some more, plus the fact we're going
to get some more assessments. We've been burned with assessments
to the point where we can't stand any more. There are a number
of people in our community who are out of their element in talking
about these things and all they do is get hung with these assess-
ments. I further feel - and I'm not talking about Nursery Lane -
I further feel Amble Road has enjoyed the privacy of a dead-end road
for ,some time and I just don't feel that a group of people should
come out and design something like this and deadlock or phony
up something to make a pleasant thing for themselves and to
hell with you, and come out on Amble Road without some kind of
round-table discussion before all this expense is brought about with
the engineers of our village, so I object to the whole thing.
7
.
.
ACTING MAYOR WOODBURN: Have there been any discussions
of this in the Planning Commission.
MRS. DOROTHY ZEHM, Deputy Clerk: We have had a public
hearing and have had comments from the residents - probably the
same people that are here tonight.
MR. MILLER: This was discussed at several Planning
Commission meetings.
MR. ARTHUR ERICKSON, 1297 Nursery Hill Lane: I do,in a
certain respect, gO along with Mr. Amble and I'm sorry his property
is involved, but the people on Nursery Hill Lane (inaudible)
the traffic congestion on Hamline with a school bus stop plus
the pemtom town houses directly south of us, we would like -
I'm speaking for myself and four other neighbors - would like at
least one other exit on this Nursery Hill Court on to Amble
Road. Not necessarily Hamline because that would put four
exits on Hamline within 200 yards of each other and I feel that
would be a bad safety factor, but with respect to Mr. Amble,
I'm sorry for him and I can see his point of view, but I'm sure
he can see our point of view for the traffic congestion on
Hamline and Nursery Hill Lane. We would like to see another exit
on to Amble Road. I also talked to the Fire Chief tonight. I'm a
member of the Fire Department, and it would be beneficial for
the Fire Department to have more than one entry into this Nursery
Hill Court. We realizefuat we can't influence your decision, but
this is our feeling that we would like another exit on Nursery
Hill Court. '
MR. JEROME WEAVER, 1330 Amble Road: There's a lot of congestion.
The school bus stops there and I don't buy that argument and I
don't see why an entrance on Hamline would benefit because I think
there's a lot of traffic on Amble. All the kids stand across
the street. If nothing else, the traffic should be slowed down
with all the kids there. Another thing- I know one woman in
particular who lives on Lot 14 and you mentioned people there might
be assessed in the future. To me that's a good way of getting
around (inaudible) all of a sudden you got that assessment in the
future. I assume that it could be in the future some people could
be assessed if it benefits them. Maybe that's a way to find
out by splitting the costs. Mr. Amble, I know, has tried to keep
things as rustic as possible. He left the woods and a lot of
things have been filled in. The swamp has been filled in. My
brother and I own a swamp across Amble Road and we were told if we
wanted to put some fill in they said it was not possible and now I
hear it may be possible. I don't know - sometimes I get a little
disgusted. It sounds like a big development talks and somebody
else who wants to fill one lot he can't do a thing, but all of a
sudden it changes and I don't understand the picture now, but I
guess I don't see why the road couldn't go out to Hamline Avenue.
I assume the building had started on the end there on Lots 8 and
10 (inaudible) in the cul-de~sac.
8
.
COUNCILMAN CRICHTON: There are existing houses on Hamline.
MR. WEAVER: I thought the road could have been put through
to Ham1ine there. I don't see why not.
FROM THE AUDIENCE: Pardon me - there are two houses there.
MR. WEAVER: But as far as the traffic on Nursery Hill Lane,
there's plenty on Amble Road and I don't think it's fair to
Mr. Amble to be cutting through Mr. Amble's property either.
It's too bad there isn't another way to solve it. I'm with Mr.
Amble 100% on that. I just can't see it.
MR. RICHARD PEDERSON, 1224 Amble Road: They did this to
me about a month ago. Hill is developing the piece south of me
and he was proposing a cul-de-sac and he wanted to come down through
my orchard. They just went to the Planning Commission and said
let's drive it here - he's a little guy and I'm putting in a
$2 million development - the hell with his land. They turned it
around for me. I had a little help from Mr. Crichton there, but
it's the little guy that gets stuck, and it's the Planning Commission
doesn't come to you. They don't call you in and say, rather
than an easement or condemnation can we get together and buy your
property. They just plow right ahead and do it and it gets dis-
gusting at times. You drive (inaudible) to Amble Road. What
about Amble Road out to Hamline? Will it be up-graded with more
assessments. That can't handle 400 a day. Have the engineers
given consideration (inaudible)
MR. CHRISTOFFERSEN: 400 traffic is a minimal construction
to be designed on residential streets of Arden Hills and does
not necessarily (inaudible) the traffic flow here.
MR. RICHARD PEDERSON; Have you seen Amble Road? A few years
ago when the sewer was put in in the fall, we agreed to the bond
issue because they were not going to put water in. There were
no plans for water on Amble Road. The next spring they came in
and chewed up the road they put in the fall before.
ACTING MAYOR WOODBURN: 17 lots possibly we're talking about.
MR. CHRISTOFFERSEN: (inaudible) eight trips would be
very conservative.
.
ACTING MAYOR WOODBURN: Driveway per resident.
MR. MILLER: The traffic assignment is using 8 or 9 per
dwelling. I would agree with Mr. Christoffersen that's fairly
high but th~are projecting on that basis and I have verified
that several times.
9
MR. PEDERSON: You were talking about 17 lots being
assessed the $200,000 and you said there's a possibility of more.
Who owns the other two from 17 to 19?
.
MR. CHRISTOFFERSEN: I don't know the owners - I believe
Mr. Amble owns these. There are 20 lots, and subtracting this,
this and this makes 17 - two more full assessment meaning sewer,
watermain and street would be these two, and this one potential
for street only.
lolR. PEDERSON: Who owns those?
MR. CHRISTOFFERSEN: I believe Mr. Amble owns these.
COUNCILMAN CRICHTON: The Council has to decide who gets
assessed and they're saying the other two affecting Mr. Amble
might be considered, and the dher one might be considered - just
giving us the full set of information.
ACTING MAYOR WOODBURN: Any further connuents? COIIlIllents of the
Council, or questions?
COUNCILMAN CRICHTON: Mr. Christoffersen - or Mr. Miller,
if we assumed this was the best '\\lay of enabling the development
with the area to be developed, but chose not to extend the north-
south leg of Amble until such time as say Mr. Amble's property was
developed, what would be the ramifications of just proceeding to
install the east-west part at this time?
MR. CHRISTOFFERSEN: I guess I would recommend, as long as
you're constructing, to at least get it down to this point
primarily because it would be difficult then to go back in and
construct this piece and actually assess it against the develop-
ment that's occurring at this time.
.
COUNCILMAN CRICHTON: Even if you took it to the southern
boundary of this property it would mean until the other area is
developed there would be no other access to Nursery Hill Court.
MR. MILLER: I would point out if that were the direction _
taken that the tax forfeit land should also be reserved, otherwise
you have that problem in the future, so if that would be the
option taken,which we had discussed - determined it was better for
resolution of the entire problem to build it at this time - but
that portion of the right-of-way should be reserved for the future
and that would leave only the Amble Lane and that would be the
only missing portion.
COUNCILMAN WINGERI': Are you responding to just the road now,
because I suppose the utilities have to go through there.
MR. CHRISTOFFERSEN: I would assume that the storm drainage -
we would have to provide some kind of outlet to this pond. The
sanitary sewer could dead~end at that point and the watermain to
dead-end, but I point out to you you're ending up with a watermain
10
.
starting On Hamline and feeding this area and dead-ending.
COUNCILMAN CRICHTON: So Anlble Road is going to dead-end
for some time.
MR. ARTHUR ERICKSON: I was the first one in on Nursery
Hill Lane and I watched that road go in and the utilities go in
(inaudible) alongside of Mr. Tschida, and I'm asking Mr.
Christoffersen - I'm a little concerned. I was under the im-
pression that when the utilities went on Nursery Hill Lane, the
dimensions were just to serve the existing lots and we were told
at the time they wouldn't be able to handle any additional homes.
I don't know - maybe I misconstrued the whole thing, but they
weren't large mains or pipes that went in (inaudible) to handle
the volume of homes you're considering, are you actually hooking
on to Nursery Hill or the units that came in behind us from the
other Karth Lake (inaudible)
MR. CHRISTOFFERSEN: The units that came in behind you
are are sanitary sewer - I ,think you're mistaking the sanitary
sewer placed down at the end of Nursery Hill Lane - the eleva-
tion was such that (inaudible) which occurred under the Karth
Lake development. We needed a lift station which was con-
structed at the intersection of Highway 96 and Lexington approxi-
mately, and that force main comes back to Hamline so we could lower
the sanitary sewer in this area here and provide sanitary sewer
service to all of these areas. I do not particularly cherish the
thought of a long dead-end water main. Six inch is an ample
size to serve several homes (inaudible) several in Arden Hills
(inaudible) 11 homes would be out of water, but if there were a
break and this were not looped, there's a possibility of a great
many more to be out of water.
MR. ERICKSON: Or if you had a house fire on Lot 1 and
two pumpers hooked up, we could'flush everybody's toilet for them.
MR. CHRISTOFn:RSEN: If you were to hook up to this hydrant
and pump from this point, if it was all on a dead-end it would
make a difference. You're right, it's less than if we had a
loop down from Anlble. If we had that, we have a feed from two
directions. And I'm trying to encourage looping, and I think
the Council is trying to encourage looping of most of the water
system in the city.
. FROM THE AUDIENCE: With this construction, would Nursery
Hill have to put up again with the heavy equipment going up and
down the street for two years? That's the only way to get in.
They told us last year it wasn't going to (inaudible), but I
noticed it there the next morning.
ACTING MAYOR WOODBURN: This would have to be the last of
it, I think.
11
.
MR. MARCEL EIBENSTEINER, 1364 Rockstone Lane, New Brighton:
I don't have a complete SOlution, but let's say we extend that
street to the south property line and put up a barricade and
work out an easement so we extend a storm sewer and sanitary sewer
with just an easement, is that a possibility? Couldn't it be
worked out on easements and barricade the road and when we have
too much traffic we extend the road down Amble?
MR. CHRISTOFFERSEN: That's more acceptable than dead-ending
at this point.
COUNCILMAN HANSON: I'd like Don to react to that question
about the quality of Amble Road handling traffic.
MR. CHRISTOFFERSEN: I can vaguely recall when watermain was
placed in Amble Road and I questioned whether it was under the
standard of construction of today for a permanent street. I guess I
can't really answer whether it's a 5-ton or 3-ton load. Granted,
it will receive more traffic. Generally the traffic that's really
hard traffic on a street such as Amble Road is truck traffic,
and that's true on any street and you will find break-up occurring
or more likely to occur on Hamline because there's a lot of truck
traffic on Hamline and very little truck traffic on a residential
street. There is some, but compared to something like Hamline
it's insignificant.
MR. ARTHUR ERICKSON: I asked this question last year and I
will ask it again. With the volume of traffic, the heavy equip-,
ment and cars that are going to be going on Nursery Hill Lane to
put in this development, and the development gets put in and all
of a sudden Nursery Hill Lane is developed end the village
engineer says it has to be resurfaced, are the home owners that
are there now going to have to foot the bill again after we have
already built the road once, or is there a possibility of the
contractor having to resurface the road and put up a bond for it?
MR. CHRISTOFFERSEN: I'm not certain of the village policy. I
can't recall on reconstruction of streets. I believe - is it a
ten or twenty year period?
.
MRS. Me NIESH: Streets are usually on a ten year period -
streets only. Street, sewer and water combination has been 20
years, but just a street improvement, those have generally been
spread over a ten year period.
ACTING MAYOR WOODBURN: In the immediate future is Nursery
Hill going to have to be done again completely from scratch?
MR. CHRISTOFFERSEN: That's a difficult question.
12
.
.
ACTING MAYOR WOODBURN: If you ever had to re-do it,.
MR. CHRISTOFFERSEN: I assume if it would be a 20-year
time there would be another assessment - after a reasonable
period of time after it was constructed. I think this is a
matter of Council decision whether streets should be assessed
or not assessed. The village has a regular maintenance pro-
gram on streets - I believe it's every four years they patch
and sealcoat, and that certainly is not assessed against the
abutting property owners and it would be a matter of how bad
the street would break up. I question whether or not Nursery
Hill, with the amount of construction you might see going in
would break up substantially because it's a good designed
7-ton street and it would take a lot of traffic, and I mean
heavy traffic.
MR. ERICKSON: We've had it.
MR. CHRISTOFFERSEN: Have you noticed any breakup on the
street?
MR. ERICKSON: Little cracks here and there - not big
chunks.
MR. CHRISTOFFERSEN: The last time I drove through I didn't
notice it.
MR. ERICKSON: There's one spot by Compton which has settled
six or eight inches along the curbline along with some other
driveways that have been backed into by heavy equipment because they
couldn't turn around on the end. Mr. Schultz's concrete driveway
has been busted up on the end because the man couldn't turn
around in the mud so he backed up his bulldozer and busted it,
but they do pile up in there. It's improved' since they put in a
wider cul-de-sac, but up until the middle of the summer it was
pretty rough.
ACTING MAYOR WOODBURN: I would assume if any connection went
in to any road from Nursery Hill Court that would be used by a
large amount of construction equipment.
MR. ERICKSON: We presumed that the heavy equipment would
be coming in from the development from behind my house (inaudible)
MR. CHRISTOFFERSEN: I think in any portion of the village
that's undeveloped the existing residential streets do provide
the access to the undeveloped property and you can understand there
isn't a Hamline Avenue or through street to each piece of property
that's undeveloped, so to develop that area, primarily you have to
use residential streets to get in and out and that's why we
design residential streets as high as we do and for longevity also,
but you have to gain access to the property sometimes through
residential streets. It's inconvenient, I'm sure, but this isn't
the only area where the Council has been faced with this problem.
13
.
(Inaudible) contractors have to use residential streets to get
into. We like to encourage the contractors to keep it to a
minimum.
MR. ERICKSON: Is there any set hours? Like, is it 6:00
o'clock in the morning to start the diesels and steam shovels?
Is that part of the village policy that they can start that
early, especially on a Saturday?
MR. CHRISTOFFERSEN: I don't know that the village has any
policy or regulations covering contractors' operations. Historically
contractors go to work as early as the farmers do and try to get
in as many hours as they can because of the limited construction
season, and this year was pretty wet in June and July.
ACTING MAYOR WOODBURN: Never any more good construction
seasons than a farmer has a good growing season.
.
MRS. DONNA MC CUNE, l315 Nursery Hill Lane: I'm for
another exit too. That traffic and our children playing in the
streets, I think would be too heavy, and I'd like to be on record
as saying I want another exit off of this.
MR. AMBLE: I'd like to say, we have children playing on
our street, and we'd just as soon not have more traffic, and
as long as we're getting picayune, whO'S going to absorb the losses
I'm taking - roughly two lots and I'm being assessed $20,000.
I'd like to know who's picking me up. I'm talking about $75,000.
Anybody have any comment?
, COUNCILMAN CRICHTON: Mr. Amble and your Honor, we have
several times indicated to the developer that we needed another
access and suggested that he work with you. His original pro-
gram wouldn't (inaudible) and he has been working with us trying
to find the best solution, but he indicated there were none you
were interested in. There wasn't another solution that would
give us the access and get to your land.
MR. AMBLE: There wasn't anything that would really solve
the problem. There was a proposed road that ran east and west
on the north side of the woods. I'm sorry - I tried to talk to
the neighbors and find a map showing this road. I think the remark I
made the last time I was here was that I had visited previously with
people on Nursery Lane and they thought when we built that it was
a dead-end road, and all of a sudden it's no longer a dead-end
road. This proposed road that ran east and west is no longer
there and all these things disappear. I just don't like the
proposal, no way.
14
COUNCILMAN CRICHTON: I guess if we went ahead with this
proposal - doesn't this land lock your property?
. MR. AMBLE: If you will give me an easement through this
tax forfeited land so I can get to that end of it and I can use
this easement on the east end of it - it's a kind of a mickey-
mouse arrangement but I'll have to accept it, but I'd just as soon
not have a road go through it.
COUNCILMAN CRICHTON: You'll still get three lots out of it.
From my standpoint this' would be too long a cul-de-sac. We need
another access. Apparently we can't get out to Hamline and there
are some disadvantages to that so it appears if we want to
develop this plat of land we have to get to Amble Road. This
one appears to be the most practical, but as an individual COuncil
member I dOn't like the thought of taking land from an individual
who isn't ready to develop or plan or go in that direction, so I
have a dilenuna and I don't know how to solve it. This appears to
be the only solution that makes any sense unless Mr. Amble has
another one that enables us to get through. '
MR. EIBENSTEINER: As far as the property is concerned,
let's say we put a barricade on the south side of the property
line - Mr. Amble gives the village an easement - 50 foot or
60 foot easement - we'd be inclined to go along with the idea.
We'll put in storm sewer, water and sanitary sewer, and put a
barricade on the south end of the property line. That way Mr.
Amble has no assessment on his property. His 150 foot lot is an
oversize lot - possibly it could be reduced to two 75-foot lots.
That way he's not landlocked. His tax structure stays the same.
We pay for the utilities without the street.
MR. CHRISTOFFERSEN: You'd pay for the water and sewer to
your property and leave the street construction out just south
of Lots 14 and 11
MR. EIBENSTEINER: I would guess if we had the sewer and
water we'd have the area pretty well built up a year from now
but if the market goes (inaudible) it would take three years,
and if there's too much traffic then the road would have to go
through and Mr. Amble be assessed.
COUNCILMAN CRICHTON: But there are safety reasons there.
.
ACTING MAYOR WOODBURN: I'll ask for comments from the
audience before turning it back to the Council.
COUNCILMAN HANSON: Mr. Amble mentioned a second easement.
Could we have that on the map? Is that off to the left?
MR. MILLER: It showed,there is a partial right-of-way at the
far right. I think that's really mis-drawn, but there's some
type of access easement set aside there. It's not a public
easement.
15
.
I
~
I
f
~
~
f
[,
"
!
l
f
!
t
~
i'
"
~.
.'
~
~
~
~
i~ .
I)
F.
I:
"
"
l:"'
L-:
~
E'
[
,,'
l:.~
,..
~
L_
COUNCIU1AN WINGERT: That's a private easement and it's a
half street width so there would have to be an additional ease-
ment if that was to be considered a legitimate easement. The
other one is at the west, or about at the proposed road.
MR. CHRISTOFFERSEN: That would be right here.
COUNCILMAN WINGERT: It occurs to me we still wind up with
the same thing. We wind up kind of deciding there's a road at
the point or that theJe's easements going through whioh probably
(inaudible) a future road, and I guess I'm persuaded to support
that position because I have none other to support. I think
it's very important there are too many (inaudible) too long to
serve with a single cul-de-sac road. I'm looking for a solution
(inaudible) If the easement on the east was a workable easement
as Mr. Miller showed us in alternative whatever it was, I think
I'd jump on that one - that being a better solution - but
I don't see one. So far in the testimony that I have heard
tonight there's no other suggestion that there's any other
solution to solve that particular problem. For lack of another, I
support this one and, therefore, I oan't see the advantage of a
half measure of not putting a street in. We lose the advantage
of it and you still decided that's where it's going to go.
COUNCILMAN CRICHTON: Could this Council, and perhaps Mr.
Popovich could tell us, if we go ahead with this one, at the assess-
ment hearing could the Council deoide that the property through which
it goes - Mr. Amble's presently unplanned for development property -
should only be assessed at a future date and defer that portion of
an assessment?
MR. POPOVICH: You could defer it, but we're just talking about
costs tonight, so at the assessment hearing you could levy all the
assessments aoross the board as we normally have done, or that
portion on the Amble,property yo~ could defer until some future
time and then pick it up at that time if you wish to do it. We
have not deferred because of the bookkeeping involved in trying
to keep track of it, but legally you could. That deoision could
be made at the assessment hearing.
MR. CHRISTOFFERSEN: May I make one statement. I think the
people (inaudible) you're alluding to another lot on this side.
Let me put the original drawing back on. I just wanted to point
out to the Council if this (inaudible) and assuming the property
line ran through here over to where that would be placed it's a
deep piece of property and there's no sanitary sewer and watermain
and that would have to be brought in from this road because there
are two lots over there and that also would have to be planned
should Mr . Amble decide to develop that into more than one or two
lots.
COUNCILMAN CRICHTON: If we put that road through we will
create two pieces of property for ~tt. Amble. Could that assessment
at an assessment hearing time be deferred? I feel that we need
an outlet and I have heard no other alternative either. That's
why ! have been searching for others for several months and this
16
seems to be the most viable solution for it.
.
MR. JOHN SAURO, 466 Bayview Drive, Roseville: I have been
counselling with Mr. Amble and I was wondering if the street was
put there as proposed, now or at a future date, this piece of
property being approximately 600 east and west and 132 running north
and south, would the Council allow a variance to have the width
of the lot facing the road to be 66 feet provided that would give
Mr. Amble four lots on the road facing east and west (inaudible)
providing that the square footages were accounted for?
ACTING MAYOR WOODBURN: You can't say what a Council would
do, but it would be essentially unprecedented to divide a lot
into lots that would be sub-standard.
MR. SAURO: Being Mr. Amble has, like he pointed out before, a
very good chance of losing a considerable amount of money, I think a
variance should be considered here.
ACTING MAYOR WOODBURN: How would the money be lost? You have
now one parcel. That's one lot without any road going past.
There's no way to legally subdivide it into more than one. So
you have one now. With the road you have three lots. Two extra
lots improved would be $30,000 - and I guess maybe more than that
the way things go nowdays, so you'd be getting $30,000 and losing
$20,000 and your net gain would be $10,000 and you're likely to be
recompensed for the road going through.
MR. SAURO: But he has room for five lots.
.
ACTING MAYOR WOODBURN: But he has landlocked himself. I
believe we had, the opportunity for statements, and I think it's
time to talk up here.
COUNCILMAN HANSON: I wouldn't mind talking on that as far as
setting a precedent. The Council has said they welcome considera-
tion of such a proposal but I think we have enough property there
that we would welcome an opportunity to review such a development
of the entire (inaudible) parcel, but we couldn't commit ourselves
to what is acceptable. But I think you have some possibilities
where you could put one driveway on a common property line and
serve two lots and that sort of thing, and could maybe work out
something. It would have to be well planned.
ACTING MAYOR WOODBURN: I can't remember dividing a lot into
sub-standard (inaudible) we have had minor variances.
COUNCILMAN HANSON: I don't know if he'd have enough property
to use some contrivance like a planned development.
ACTING MAYOR WOODBURN: 'Possible - the 67 foot width lot.
17
,
.
COUNCILMAN CRICHTON:' It doesn't appear to be possible
(inaudible)
Councilman Wingert then introduced the following resolution
and moved its adoption:
Resolution No. ZIf- 7 S
RESOLUTION ORDERING THE CONSTRUCTION OF
IMPROVEMENT NO.SS-W-P-ST-78-3 UNDER AND
PURSUANT TO MINNESOTA STATUTES, CHAPTER 429
BE IT RESOLVED by the Council of the City of Arden Hills,
Minnesota, that in accordance with the provisions of Minnesota
Statutes, 1961, Chapter 429, as amended, the Council held a
public hearing on the proposed construction of Improvement No.
SS-W-P-ST-78-3 consisting of the construction of sanitary sewer,
watermain, bituminous paving, concrete curb and gutter, storm
drainage facilities, right-of-way acquisition and necessary
appurtenances in the area bounded by Hamline Avenue on the west,
Nursery Hill Lane on the north, Karth Lake on the east, and
vacated S.T.H. 51 on the south, as described in the Notice of
Hearing at a cost presently estimated at $200,000.00, and sub-
stantially in accordance with the preliminary report as to the
feasibility thereof which is now on file in the office of the
City Clerk Administrator; and having considered the views of all
interested persons and ,being fully advised in the premises, the
Council does hereby determine and order that said improve-
ment shall be constructed and financed, and special assessments
shall be levied therefor, pursuant to said Chapter 429, and that
the area proposed to be assessed therefor shall include the
property as described in the Notice of Hearing. The City Consulting
Engineer is directed to prepare and submit to.the Council the final
plans and specifications.
The motion for the adoption o,f the foregoing resolution was
duly seconded by Councilman Hanson, and upon roll call vote being
taken thereon, the following voted in favor thereof: All; and
the following voted against the same: None; whereupon said resolu-
tion was declared duly passed and adopted.
.
~
~~~
~~.
!?~~
~~
18