Loading...
HomeMy WebLinkAbout77-051 77-$7 . . . Ihctract of Min~t:." of Mee'btns of City council City of kdlltn Bills Ramsey COunty, Mim\8sota September 19, 1977 I Pursuant to due call and notice 'tlheS'eof, a special meeting of the CUI:y council of the city of kden Billa. Minnesota, was held in the City Ball in said City on Monday. the 19th day of September, 1917, at 7.30 o'clocK p.m. The follOllfing me!lIbeJrs ~. present: Mayor Crepeau and Councilmen Woodburn, Crichton and Hanson. and the following were '8beent:: Councilman Wingert Also present were: Charlotte McNiesh, City Clerk Administrator Don Lamb, City Treasurer, Don Christoffersen. City Consulting Engineer, and Peter S. Popovich, City Bond Consultant. The City Clerk AdIIII.~8tnt:or presented an aftidavU showing . publication of notice of hearing on proposed lmpI'oVement I/Q. P-77-4 in accordance with the resolution adopt:e<t August 29, 1977. which affidavit was examiDedend found to be satbfactory and was directed to be filed by the Clerk Adlld.nistrator. The City Clerk Administrator also exhibited a Certificate of Mailing Notice of Hearing to all affeA:ted property OWDl!l&'S, which certifi- . cate was examined and found to be satisfactory and was directed to be filed by the Clerk Administrator. , All plIW80fts present were then afforded opportunity to be heard. and tln n....s and addresses ..f the persons appearing and heard by 'the council, and the substance of the views presented . by them were as follows: . Mayor Crepeau asked the consulting engineer to explain the scope of the project and its alternates. I MR. CHRISTOFFERSEN: The proposed Harriet Avenue Improvement is located between Snelling Avenue and Lexingtoft Avenue. south of County Road E. and it extends southerly approximately 1200 feet to the existing Harriet Avenue which is shown on this drawing at this point. Existing Harriet Avenue ends in a cul-de-sac. The proposed Harriet Avenue extension will be a northerly extension from this road to County Road E. The improvement consists of concrete curb and gutter. bituminous surfacing. roadway excavation. and a pedestrian underpass. and drainage required to drain the site. The drainage is shown on a smaller map in this area. approximately a half of the length of the road. and it' s primarily installed to drain the road. We find the project to be feasible. COUNCILMAN CRICHTON: Storm drainage running which direction? MR. CHRISTOFFERSEN: SOutherly_ It picks up the roadway drainage and carries it southerly. . COUNCILMAN CRICHTON: Discharges out in the open? MR. CHRIS'l'OFFERSEN: Right. MAYOR CREPEAU: OUr fiscal consultant. Mr. Peter Popovich. will give us the costs and the financing_ . MR. POPOVICH: As you know. in a feasibility report the engineers have given several alternatives for purposes of the hearing tonight. We published a cost that was the highest of all alternatives. which was $122.616. The alternatives relate to a 36 foot roadway or a 44 foot roadway. and under I . . each whether there should be an aggregate or bituminous base. Depending on which way you go, those costs range from $109,983 on a 36 foot aggregate base to $112,550 on a 36 foot bituminous base. Xf it goes to 44 feet, it's $122,616 for the aggregate base, and $121,263 for the bituminous base. I Included in those costs are certain contingencies and extra costs that are explained in the report which are in line with current standards in approaching it. The one thing that is left out is the acquisition of right-of-way so far as the cost, but there is a 15% overall extra cost plus a 10% contingency so within those figures the costs of the right-of-way, depending on what it would be and what you do with the underpass, it will come out approximately at the figures that we end up with. On the other hand, even if you included all of these things and added the right-of-way. we can still exceed this cost by 25% without starting over again, but X wish to point it out so that you know of the contingencies. . There are certain aspects to be considered in view of what we did on County Road F. Number one, what should be the assessment charge? Should it be 100% or something less. If the cost is based on 100%, and we want to give the worst figure, if it's a 36 foot eggregage roadway it would be $49.99 a foot. If it's a bituminous 36 foot roadway, it's $51.16 a foot. If it's a 44 foot roadway with aggregate base it's $55.73 a foot, and if it's bituminous it would be $55.12 a foot. If the council" and that depends on how the hearing goes - would reduce that to 80/20, those costs would be reduced accordingly, but for purposes of the feasibility hearing we have been assuming 100% costs. . The second aspect to consider would be the length of the assessment. As you know, we had quite a discussion on County Road F - 10, 15 or 20 years, and perhaps we should hear from the people who petitioned as to what period of time they prefer. Xf you follow what you did on county Road P, I . I it would be a 15 year assessment with one-fifteenth of the principal each year and interest as we have been charging, at 8%. If it went 20 years, it would be that much more (inaudible). If it goes to 10 years, it would be one-tenth of the principal and interest on a 10 year basis, and the length of time is normally one that should be dependent upon - will the improvement outlast the collection of assessments, because obviously you don't want to have an improvement in where the improvement begins to disintegrate before you have collected the assessments. We should hear again from the petitioners probably on that point, but as you know, normally on street improvement prog'rams they're 10 years, unless it's an extraordinary street. I have seen them 15 years as here. Seldom have we gone to 20, and never in this city. Some of the other cities may, but that's rare, and I think that's something' that we should hear from the petitioners which goes to the feasibility of the program. Whether you cut it to 10 years at 100% assessments or whether 20 years at 100%. So far as the feasibility is concerned, those costs remain the same except the interest goes on, and that can be taken care of by the petitioners any time by prepaying in any year during the course of the assessment. . . I assume that no assessments could be spread this year because the improvement isn't done. The projeet would be completed next year. We would have an assessment hearing in the fall, and first installments collected in 1979 because they would be spread in 1978, with the right of prepayment guring that 30 day period. . Whether we have to issue bonds to do this - at this particular point of time, in view of our current bond issue that's underway on October 11, we're assuming there's enough flexibility that the matter could be taken care of internally next year from the proceeds of other funds, or tlhether we issue temporary or long' term bonds would depend on the market, but from a bond issuance point of view, obviously I . . , . . I . you can sell the bonds. If you can get away without selling bonds - it's only $122.000 - unless we do it in connection with other improvements. it would be preferred to handle it internally if we could. so the long term financing is not the immediate concern of the council tonight except you have the flexibility of going next year. whichever way you do go. If there az:e any questions. I will be happy to try to answer them. MAYOR CREPEAU: The next thing we should have is questions from the floor. Statements pro or con. Does anyone care to make a statement? Anyone present? MR. ROGER BAUCK. 4152 North Victoria: I represent Mutual Service Insurance COmpanies. Flaherty's Arden BOwl and us joined in a petition for the street. I did not talk about the length of the street. I guess the only comment I would like to make - Mr. Popovich mentioned the possibility of a bond issue. We would be willing to cash our part out to eliminate that bond issue. MR. POPOVICH: That would be fine, because during that 30 day period. once we have the assessment hearing. if they prepaid. and knowing in advance that they would probably do that. that's a matter for us to consider whether we do go into financing next year. COUNCILMAN CRICHTON: It's my understanding that the term of the assessment would not be determined actually until we have the assessment hearing. MR. POPOVICH: That' s correct. But the only reason I bring it up tonight is in the event somebody thought it might affect the feasibility as to, the yearly cost being so high. This is particularly true when you have a lot of people inVOlved. but so the record is clear, it's on the record. We do not have to make that decision until the assessment hearing. . , . . , . MAYOR CREPEAU; Any other questions or statements? COtlNCILMAN HANSON: It was my ~derstanding the last time we discussed this, it so~ded like the Co~cil had decided not to have the pedestrian ~derpass provided for this, and it was included in the feasibility study. COUNCILMAN CRICHTON: I think what was determined at that time was that it would be placed in there as an option so we could see what the prices were one way or another, so you did the right thing in preparing what your estimate was. I agree that night there were some eomments from the Co~cil that perhaps it wasn't a good idea, and as a result of that, your Honor, I asked the Public Safety Committee what their comments were on that and they concurred that they would discourage the building of any underpasses except where absolutely necessary. It might create more difficulties than it would solve. I took that information to the Parks and Recreation Committee and indicated to them I would withdraw my support of the pedestrian ~derpass at the CO~cil meeting unless they had some heavy feeling for it. They aqreed they were not overly anxious to have it. It would be nice but (inaudible) I would withdraw the request. SO far as I'm concerned. we can take the underpass out at this time. MAYOR CREPEAU: Any other comments? COtlNCILMAN WOODBURN: I think there may be something to be said by Mr. Hauck or Mr. Christoffersen about the land. Are you prepared to say anything for the record or not? MR. ROGER HAUCK: Mr. Christoffersen ard I talked about this and there is a question as to whether the city should buy the land or we deed it to the city, and I guess the easiest thing to do in the interest of saving time is to deed the land to the village, and we're willing to do that. ,. . MR. CHRISTOFFERSEN: 'l'here is one thing that when :t talked to you last week, :t was under the impression we may have to go through another hearing if it were to be purchased, and that is not the case. :tt was advertised at that time so :t did want you to be aware of that situation. I COtlNC:tLMAN WOODBURN: Regardless of whether the land is donated, likely the assessments have to be equal. Mr. popovich can collUllent on this. . MR. POPOVICH: %t's difficult because the assessment should be according to benefits, and theoretically the benefits are equal on both sides of the street to the benefitted property. We have had (inaudible) where if the Council makes a fact finding that one parcel got more benefit than another. you give them a reduced assessment. That's not the case here so that the matter of being able to reduce the front footage would be decreased accordingly. :t might say to Mr. Hauck, :t ran into the same situation in my village, and we donated the land and arrived at a price, and Internal Revenue gave us an income tax deduction for a charitable contribution. My neighbor and :t were audited and the amount was sustained by the :tnternal Revenue auditors. If you were to acquire it by condemnation. what have you, or even if you agreed on a price, then obviously that's a cost that would be part of the improvement and would have to be included in and it would be added to both parties so at least you know you'd be picking up half anyhow and you m~9ht come out all right on the contri- bution part so I suggest you look at that. COUNC:tLMAN WOODBURN: Another point is that the insurance cOJl\pany, and :t believe Flaherty's, have asked for a 44 foot wide road. (:tnaudible) conceivable. :t suppose, to put a 44 foot road into Mutual Services. . , . . , . . , . . MR. CHRISTOFFERSEN: I would like to look at the alterna- tives. I believe it would be to some benefit to indicate a narrow street at the southerly end. BOw that would be achieved at this time I really haven't gotten into the design criteria. One thought I had was to come around the curve at the south end and then show a narrow road and then widen to a 44 foot street, perhaps even keeping the west side of the road as a narrow portion, or the 18 foot from the centerline until you reach the driveway of Mutual Services, and then from that point making it wider, but keeping' the east half the 22 foot width type of roadway all the way through. There is certainly potential fOr more traffic from the property on the east side than that on the west side. The west side - we know where the control will be. The east side we c;lo not at this time. MAYOR CREPEAU: Mr. Christoffersen. the Mutual Insurance Service Company drive that you have on the map on the wall, is that 250 feet south or is that 400? MR. CHRISTOFFERSEN: That unfortunately scales about 200 to 300 feet. The drawing' up on the board there is 450 feet. We have received a copy of a letter from Mutual Insurance Company. We agree the statement in the report of 250 feet was incorrect. It should have been 450 feet. Our main map - that's not - this is a schematic drawing'. That main map is drawn at 450 which is correct. COUNCILMAN CRICHTON: At this point in time there's nothing' sacred about where that driveway will be. I realize Mutual Services plans placing' it about 450 feet. but it hasn't been settled. That's one of the reasons why I questioned narrowing at the south end and then widening it because we don't know what will happen on the east side of the street or. theoretically. where their drive is going to come. . , . . , . . MR. CHRISTOFFERSEN: I'm not certain what their plans are. Have you definitely located that driveway? MR. ROGER HAUCK: . No, we haven't. We'll be bringing that before the Planning Commission the first week of October. MR. CHRISTOFFERSEN: I know the initial plans - I believe I scaled off 450 feet. COUNCILMAN CRICHTON: I think there's some general desire on the part of us that it be fairly far north which would reduce the (inaudible) of people going out (inaudible). MR. ROGER HAUCK: In answer to Mr. Crichton's question, and bringing it farther to the north, I think that suggestion came from the Village Council and we're working on it. It's very possible that we will wind it through from the north a little closer to County Road E. I think one of the concerns we have, as I pointed out in my letter, is keeping good faith with the residents of Hunter's Park. Primarily it's a real concern to us and I'm afraid that if we went two.lane or three, more of our people would be forced to (inaUdible) that area for exit - not entrance, but exit. MR. CHRISTOFFERSEN: One thing in mind about locating and crowding it to the north too much is the fact that we would like to have some area or build-up for your traffic at the time of departure. COUNCILMAN CRICB'l'ON: I don't kpow where the magic point is. One other point I wanted to make sure of, again referring to the letter from Mutual Service. Their petition did ask, of course, or expect that the cost would be offset by Minnesota State Aid funds, and I assume that it will be. Again, that will be settled at the assessment hearing. But I did want to mention that the amount of Minnesota State Aid funds that we have for the roads that are earmarked is not enough to pay for them, so we will not necessarily be using the full amount even if we have that left, but from my standpoint, I am sure some of it will be. . , . . , . COUNCILMAN HANSON: On that same subject, I wonder if I'm misunderstanding, or the petitioners were, that regardless of whether State Aid funds are used, I don't think that would affect the assessment against the property. COUNCIIWIN CRICB'l'ON: It would appear, Mr. Hanson, as I understand it, because the Council will presumably decide it will assess 90% or 80% or 50% to the benefitting holders, presumably the existence of State Aid funds to the Council might make it possible for us to state 80% or 65% instead of 90%. If we only assess 80% we know the other 20% (inaudible). MAYOR CREPEAU: Any.other questions, statements or comments? The Council then could adopt a resolution approving the project and ordering the engineer to prepare the plans and specifications and close the hearing and delay the decision to a later meeting. What is the pleasure of the COuncil? COUNCILMAN WOODBURN: I'd like to ask Mr. Christoffersen if he wants to study this IIIOre in relation to narrowing it or widening it because I think that's a 900d idea. I think we must have IIIOre width of roadway on the north, if not on the south. MR. CHRISTOFFERSEN: The cost of the overall improvement will cover any cost from 90ing 36 to 44 feet, and the cost will be in between 36 Doot width and 44 fOot, so as far as costwise, I would think it would be better determined as the plans and specifications are drawn up. And you have a chance to review the plans and specs befOre you order the advertisement fOr bids, and I think that would be the appropriate time to make a final determination. COUNCILMAN CRICHTON: It appears that the difference between the two widths for the entire length is about $10,000 so if, in fact, we're going to widen it half way - something like half way - then the difference is like $5,000. perhaps . . , . . , . . the action the council might want to consider tonight is to approve the project 44 foot roadway narrowing to 36 as it approaches the turn of existing Harriet, leaving the exact point (inaudible). That's one possible way the Council may approach this. As a non engineer, I need to ask the engineer the relative merits of aggregate base versus bituminous base. MR. CHRIS'l'OFFERSEN: In some cases the aggregate base - this particular case I would prefer utilizing the bituminous base because it's an industrial street. You can drive on it (inaudible) while they're paving and also during (inaudible) the weather conditions. A bituminous surfacing is more driveable than an aggregate surfacing. Contractors have problems with this at times, particularly when you have , potential traffic coming through, and in this case it would be construction traffic and it tends to contaminate the base and foul up the sub base materials. so the bituminous base is a better base to use on this road. COUNCILMAN CRICHTON: What did we use on county Road F? MR. CHRISTOFFERSEN: We used some aggregate and some bituminous because we had a final wear course, but the final wear course was installed this year. The rest was installed last year and I think this brings a better product in the end. It allows some time for settlement to occur, if there is any, and in Arden Hills you can always expect some. Councilman Crichton then introduced the following resolution and moved its adoption: Resolution No. 77-51 RESOLUTION ORDERING THE CONSTRUCTION OF IMPROVEMENT NO. P-77-4 UNDER AND PURSUANT TO MINNESOTA S'rATUTES, CHAPTER 429 B;E IT RESOLVED by the Council of the City of Arden Hills, Minnesota, that in accordance with the provisions of Minnesota Statutes 1961, Chapter 429, as amended, the COuncil held a .. , , public hearing pursuant to published notice. on the proposed construction of Improvement No. P-77-4. consisting of the construction of bituminous surfacing of a 44 foot roadway, concrete curb and gutter. necessary drainage. right-of-way acquisition. and necessary appurtenances generally in the area bounded by Lexington Avenue on the east. Snelling Avenue on the West. county Road E on the north. and 1400 feet south of County Road E on the south as described in the notice of hearing at a cost presently estimated to be approximately $103.262. and substantially in accordance with the preliminary engineer's report as to the feasibility thereof which is now on file in the office of the City Clerk Administrator, and having considered the views of all interested persons and being fully advised in the premises. the Council does hereby determine and order that said improvement shall be constructed and financed. and special assessments shall be levied therefor. pursuant to said Chapter 429. and that the area proposed to be assessed therefOr shall include the property as described in the notice of hearing, and that Short. Elliott. Hendrickson & Associates are hereby directed to prepare and submit to the Council final plans and specifications for the construction of said imp:rovement. . . The motion for the adoption of the fOregoing resolution was duly seconded by Councilman Hanson and upon roll call vote being taken thereon. the following voted in favor thereof: All, and the following voted against: None, wharQupon said resolu~ion was declared duly passed and adopted. . ,~ @wa.:!l/{)d . A