STATE OF MINNESOTA
COUNTY OF RAMSEY
CITY OF ARDEN HILLS
RESOLUTION NO. 82-f~
RESOLUTION ESTABLISHING FEES FOR ELEC-
TRICAL PERMITS AND RESCINDING RESOLU-
TION NO. 80-60
WHEREAS, Section 6-91 of the City Code provides
that fees for electrical permits be establ ished by resolution
adopted by the Ci ty Counci I, and
WHEREAS, Resolution No. 80-60 established electri-
cal permit fees effective January I, 1981, and
WHEREAS, the Finance Committee, after careful study,
has recommended changes in the present fee schedule:
NOW, THEREFORE, BE IT RESOLVED, that effective
Januqry I, 1983, the permit fees shall be as follows:
(a) Minimum fee for each separate Inspection
of an installation, replacement, alteration
or repair limited to one inspection only----$IO.OO
(b) Services, changes of service, temporary services,
additions, alterations, or repairs on either
primary or secondary services shal I be computed
separately:
o to 100 ampere capacity- - - - - - - - - - $15.00
101 to and including 200 ampere capacity - -$18.00
For each additional 100 ampere capacity or
fraction thereof - - - - - - - - - - - -$ 8,00
(c) Circuit, installations of, additions, altera-
tions or repairs of each circuit or sub-feeder
shall be computed separately, including cir-
cuits fed from sub-feeders and Including the
equipment served, except as provided for in
items (d) through (k):
o to and including 30 ampere capacity - - - $ 4.00
(maximum number of 0 to 30 ampere circuits
to be paid on, is 30 to anyone cabinet)
31 to and Including 100 ampere capacity - - $ 6.00
For each additional 100 ampere capacity or
fraction thereof - - - - - - - - - - - - - -$ 3.00
(d) Maximum fee on a single family dwelling shall
not exceed $60.00 if not over 200 ampere
capacity. This includes service, feeders,
circuits, fixtures and equipment. The maximum
fee provides for not more than two rough-in
inspections and the final inspection per
dwelling; Additional inspections at the re-
inspection rate.
ee) Maximum fee on an apartment bui Iding shall
not exceed $30.00 per dwelling unit for the
first 20 units and $25.00 per dwelling unit
for the balance of the units. A two-unit
dwelling, (duplex) maximum fee per unit as
per single family dwell ing.
. .
(f) The maximum number of 0 to 30 ampere circuits
to be paid on anyone Athletic Field lighting
standard I s ten.
(g) In addition to the above fees:
.
(I) A charge of $1.00 wi II be made for each
street ligntlng-5tandard.
(2) A charge of $2.00 wi II be made for each
traffic signar-standard. Circuits origi-
nating within the standard will not be
used when computing fees.
(h) In addition to the above fees, all transfor-
mers and generators for light, heat and power
shall be computed separately at $5.00 per unit
plus 25t per KVA up to and IncludTngIOO KVA.
101 KIT and over at 20~ per KVA. The maximum
fee for any transformer or generator in this
category is $50.00.
(I) In addition to the above fees, all transform-
ers for signs and outline lighting shall be
computed at $4.00 for the first 500 VA or frac-
tion thereof par-unlt, plus 40t for each addi-
tional 100 VA or fraction thereof.
(j) In addition to the above fees (unless included
in the maximum fee filed by the initial installers)
remote control, signal circuits and circuits of
less than 50 volts shall be computed at $3.00
per each ten openings or devices of each system
plus $1.00 for each additional ten or fraction
thereo~
(k) In addition to the above fees, the inspection
fee for each separate inspection of a swimming
pool shall be computed at $15.00. Reinforcing
steel for swimming pools requires a rough-in
inspection.
(I) For the review of plans and inspecifications
of proposed installations, there shall be a
minimum fee of $100.00 up to and including
$30,000 of electrical estimate, plus 1/10 of
1% on any amount In excess of $30,000 to be
paid by persons or firms requesting the review.
I
(m) When re-inspection is necessary to determine
whether unsafe conditions have been corrected
and such conditions are not subject of an appeal
pending before any court, a re-Inspection fee
of $10.00 may be assessed in writing by the
inspector.
(n) For inspections not covered herein, or for
requested special inspections or services, the
fee shall be $17.00 per man-hour, including
travel time, plus 20~ per mile traveled, plus
the reasonable cos~of equipment or material
consumed. This section is also applicable to
inspection of empty conduits and such jobs as
determined by the City.
.
I
(0) For inspecTion of Transient projects including
but not I imited TO carnivals and circuses, the
inspection fees shall be computed as follows:
Power supply units according to Item (b) of the
fee schedule. A like fee will be required on
power supply units at each engagemenT during
the season, except that a fee of $17.00 per hour
wi II be charged for additional time spent by the
inspector, if the power supply is not ready for
inspecTion as required by law.
Rides, devIces or concessions: shall be Inspected
at their fIrst appearance of the season and the
inspection fee shall be $10.00 per unit.
//;
Passed by the Arden Hill s Counci I th i s ../;;:J:;.,t day Of/~
1982.