Loading...
HomeMy WebLinkAbout2023-018Page 1 of 16 City of Arden Hills Ordinance 2023-018 – Appendix A 2024 Fee Schedule I. Administrative Chickens – Licenses Two years (Pro-ratedfor second year @ $15.00) $30.00 Dogs/Cats – Licenses Two years (Pro-ratedfor second year @ $15.00) $30.00 Dogs/Cats –Boarding $22.00 per day Dogs/Cats – Impoundment Fee $50.00 Dogs/Cats –Surrender Fee Each $25.00 Dogs–Residential Kennel License Annual $21.00 Dogs –Dangerous Dog Fee Annual $500.00 Dogs–Potentially Dangerous Dog Fee Annual $250.00 Copying – General City Material $0.25 8 ½ x 11 and Legal; $0.50 large. Per Page.Add postage if mailing copies Assessment Search $53.00 per half hour Private Activity Revenue Bonds Non-refundable application fee $500.00 AnnualAdministrativeFee 1/8 of 1% (0.125%) of outstanding principal balance of the bonds for the life of the bonds Reimbursement of all City costs II. Building Construction (All permits are non-refundable after 90 days) Building Permits – Permit and Plan Review Fees Fees shall be based according to the 2023 State Statute 326B.153 and are determined by the City’s Building Official Commercial Building Permits – Plan Review Fee 65% of Building Permit Fee. Payment equaling half of this fee is due at time of permit submittal (non-refundable) Residential New Construction/Additions Escrow To be determined by Building Official TemporaryCertificateof Occupancy (CO) Escrow To bedetermined by Building Official Building Permits– Re-inspection $63.25 per State Statute 326B.153 BuildingPermits– Manufactured Home Location $100.00 + StateSurcharge feeas outlined in State Statute 326B.148 Building Permits – Demolition Permit Fee $100.00 + StateSurcharge fee as outlined in Statute 326B.148 Escrow $2,000 BuildingPermits– Special Investigations 100% of Permit Fee Page 2 of 16 State Surcharge – basedon valuation Fee based on 2023 State Statute 326B.148 State Surcharge – Fixed Fees Fee based on State Statute 326B.148 PlumbingPermits– Minimum Fee $60.00 Plumbing Permits – Residential 1.25%of Project Value Plumbing Permits – Commercial 1.25%of Project Value +$50.00 Electrical Permits – General See Exhibit “A” attached to fee schedule MechanicalPermits– Minimum Fee $75.00 Mechanical Permits – Residential 2%of Project Value MechanicalPermits– Commercial 1.25% of Project Value + $50.00 FireProtection Permits – Permit Fee Fees shall be based according to the 2023 State Statute 326B.153 and are determined by the City’s Building Official Fire Protection Permits – Plan ReviewFee 65% of Permit Fee FireProtection Permits – Re- inspection $63.25perStateStatute 326B.153 III. Liquor Licensing On-sale 1,999 square feet (SF)or less $3,465.00 On-sale 2,000 (SF)–2,999 (SF)$4,620.00 On-sale 3,000 (SF)–3,999 (SF)$5,775.00 On-sale 4,000 (SF)or more $6,930.00 On-sale,Sunday $200.00 (340A.504Subd.3(b) limits $200 fee for Sunday sales) Off-sale $210.00 Club Fee $315.00 On-sale,Malt Beverage $126.00 Off-sale,Malt Beverage $42.00 On-sale,Wine $ 2,000.00 (340A.408 Subd. 2(c) limits fee to $2000 or half of on-sale license fee,whichever is less) Strong Beer When part of On-Sale Wine License No Charge Investigation Fee $158.00 MinorConsumption Violation with Server Training First Violation $105.00 Second Violation $525.00 Third Violation $1,050.00 Fourth Violation $1,575.00 MinorConsumption Violation without Server Training First Violation $525.00 Second Violation $1,050.00 Third Violation $1,575.00 Fourth Violation $2,100.00 andmay be subject to license revocation Page 3 of 16 IV. Maps and Ordinances Zoning Ordinance Municipal Code Comprehensive Plan $0.25 per side Color Maps (8.5 x 11)$2.00 Color Maps (11 x 17)$4.00 Street Maps $2.00 As-Builts (11 x 17)Based on number of copies and staff time V. Parks & Recreation YouthAthleticAssociation Field Rental – including Non-Profit Per two hour time block $$38.00 per time block + applicable tax Adult Club/ Intramural Field Rental Per two hour time block $55.00 per time block + 8.375% applicable tax Ball Field Rental, Unlighted Per two hour time block. Tournament fees are extra. $110.00 per time block + 8.375% applicable tax Ball Field Rental, Lighted Per two hour time block. Tournament feesare extra. $135.00 per time block + 8.375% applicable tax BallFieldTournament Fee (Adult), Full Maintenance Includesallday maintenance staff on site $535.00 per day + $200.00 damage deposit + 8.375% applicable tax Ball Field Tournament Fee (Adult), Minimum Maintenance Includes prep for fields and midday drag of fields $320.00 per day + $200.00 damage deposit + 8.375% applicable tax WarmingHouse Rental/ IceRink Rental Onlyallowedduringnon-public use hours unless authorized by City staff $55.00 per hour + $200.00damage deposit + key deposit + 8.375% applicable tax Picnic Shelters -Resident Available for reservation No Charge Picnic Shelters – Non-Resident Available for reservation $30.00 + 8.375% applicable tax Picnic Pavilions –Resident Includes up to five picnic tables $125.00 per time slot + $200.00 damage deposit + 8.375% applicable tax *Fee waived for Night to Unite and other public events open to all Arden Hills residents. Picnic Pavilions – Non-Resident Includes up to five picnic tables $200.00 per time slot + $200.00 damage deposit + 8.375% applicable tax Picnic Pavilions – Resident Non-Profit Includes up to five picnic tables $85.00 per day + 8.375% applicable tax + $200.00 damage deposit Picnic Pavilions – OtherNon-Profit Includes up to five picnic tables $110.00 per day + 8.375%applicable tax + $200.00 damage deposit Additional Picnic Tables For every two extra tables $20.00 + 8.375% applicable tax* *fee waived for Night to Unite and other public events open to all Arden Hills residents Community Garden Plot One Plot Annual $55.00 + 8.375% applicable tax Community Garden Plot Second Plot Annual $25.00 + 8.375% applicable tax Page 4 of 16 Room Rental – City Hall/ CommunityRoom (Normal business hours: 8:00 am – 4:30 pm) (Non-businesshours: weekends and holidays) Per Day (Scheduling a room after regular hours is contingent upon the presence of a city employee; In the event staff is not available, the City reserves the right to deny application). Regular business hours usage: Army National Guard: No charge City Government: No charge Resident, Non-profit: $90.00 Resident, For-profit: $120.00 Non-Resident, Non-profit: $130.00 Non-Resident, For-profit: $155.00 (+ 8.375% applicabletax) Non-business hours usage: Resident: $200 Non-Resident: $225 (+ 8.375% applicabletax) Room Rental – City Hall/Small Conference Room (Normal business hours: 8:00 am – 4:30 pm) (Non-businesshours: weekends and holidays) Per Day (Scheduling a room after regular hours is contingent upon the presence of a city employee; In the event staff is not available, the City reserves the right to deny application). Regular business hours usage: ArmyNational Guard: No charge City Government: No charge Resident, Non- profit: $50.00 Resident, For-profit: $60.00 Non-Resident, Non-profit: $70.00 Non-Resident, For-profit: $80.00 ( + 8.375% applicabletax) Non-business hours usage: Resident: $200 Non-Resident: $225 (+ 8.375% applicabletax) Room Rental – Damage Deposit Required $200.00 Equipment Rental – DVD, VCR, T.V. $20.00 + 8.375% applicable tax VI. Planning and Zoning (Each separate land use request shall be charged a separate administrative fee and escrow even if submitted on the same application. Costs expended in reviewing and processing an application will be charged against the cash escrow and credited to the City. Charges to the escrow include planning and engineering staff time, City attorney and consulting fees, and mailing costs. If, at any time, a required cash escrow is depleted to less than 20% of its original amount, the applicant shall deposit additional funds in the cash escrow account as determined by the City. The escrow may be reduced or increased by the City Planner on a project by project basis.) Page 5 of 16 Description:Escrow Fees:Initial Application Fees: Preliminary Plat Administrative Fee $500 Escrow $2,500 Final Plat Administrative Fee $450 Escrow $1,000 LotSplit/Minor Subdivision(R-1 and R-2 only) Administrative Fee $350 Escrow $1,500 RezoningorTCAAP Regulating Plan Map Amendment Administrative Fee $500 Escrow $1,500 ComprehensivePlan Amendment Administrative Fee $550 Escrow $2,500 Variance or Permitted Adjustment Administrative Fee $350 Escrow $1,000 Conditional Use or Interim Use Permit/CUP orIUP Amendment Administrative Fee $400 Escrow $1,500 Planned Unit Development Master Plan or Special Development PlanMaster Plan Administrative Fee $600 Escrow $2,500 FinalPlannedUnit Development or Final Special Development Plan Administrative Fee $350 Escrow $2000 Planned Unit Development Amendment or Special Development Plan Amendment Administrative Fee $400 Escrow $1,500 Concept Review Administrative Fee $300 Escrow $750 Vacation of Easement Administrative Fee $150 Escrow $1,000 Site Plan Review Administrative Fee $450 Escrow $1,500 City Code Amendment Administrative Fee $350 Escrow $1,500 Zoning Code or TRC Amendment Administrative Fee $400 Escrow $1,500 Zoning Letter Administrative Fee $75 Land Use Requests – Not Already Specified Administrative Fee $150 Escrow $1,000 Zoning Permit Decks under 30”, Driveways, Fences, Sheds, Temporary Structures, and ChickenCoops $65 Commercial Parking Lot Resurfacing $100 RecreationalVehicle Parking Permit 7Day Permit, renewable once per 12 months $25 Home Occupation I Permit No charge Home Occupation II Permit Administrative Fee $150 Escrow $500 Commercial Outdoor Displayand Sales Area Permit $100 Page 6 of 16 Commercial Recreation Outdoor Permit $100 Appeal ofAdministrative Zoning, Sign, or Subdivision Decisions Administrative Fee $150 Escrow $1,000 TCAAPDevelopment Related Professional Services Charge Any portion of the TCAAP development can prepay an amount on behalf of future parcels to be developed and that the prepayment amount will be netted out and the fee schedule will be updated annually. $2,743 per acre VII.Public Works/Engineering Right-of-Way Permit Permit Fee $175.00 Escrow To be determined by Engineer Right-of Way Permit – Small Cell Wireless Facilities Permit for up to 15 locations; rent and maintenance per each location $175.00 ROW permit fee, rent $175.00 per year, maintenance $26.00 per year Grading & Erosion Control Fees Permit Fee $175.00 Escrow To be determined by Engineer After Hours Call-out Conducted outside normal business hours, minimum of 2 hours $100 per hour Holiday Call-out Minimum of 2 hours $150.00 per hour VIII. Utility Hookup Charges Water Permits – Service Installation/Repairs/Alteration/Re- inspection (Regular Business Hours) Per inspection $60.00 WaterPermits– Interior Plumbing, New Home $45.00 Water Permanent Disconnect $230.00 Curb Box and Service Lead, 1” Service Connection on Unsurfaced Street $175.00 Largerthan1”Service Connection Set by Engineer Water Permits –Plan Check Fee Set by Inspector Water Permits –AfterHours Inspection or Re-inspection Call-out rate per visit, minimum of 2 hours $100.00 per hour Water Permits – Holiday Inspection or Re-inspection Call-out rate per visit, minimum of 2 hours $150.00 per hour Page 7 of 16 Hydrant Meter Rental $2,000deposit, monthly rental of $32.00, water permit fee of $180.00, State surcharge of $1.00 plus applicable standard water usageratecharge for consumption Water Meter/Spacer Charges – CustomerRequestedWaterMeter Accuracy Test Fee includes removal of meter, bench test at maintenance facility, and returning meter to residence; Fee will not be applied if the meter is found to be inaccurate to a degree exceeding three percent (3%) from the result of the bench test Based on Meter Size Contact Public Works for Quote WaterMeter/SpacerCharges– 5/8” x ¾” Meter Model 25 Standard Meter $480.00 WaterMeter/SpacerCharges– 3/4” x 7 ½” Meter Model 35 Contact Public Works for Quote Water Meter/Spacer Charges – 1” Meter $590.00 WaterMeter/SpacerCharges– Greater than 1” Contact Public Works for Quote Water Connection Fee – Connection fee for previously un- served or expanded lots $855.00per acre or portion thereof WaterAvailabilityFee– New or Additional Units The units are based on the MetropolitanCouncil’s formula for calculating new sewer availability charge (SAC) units $ 1,375 per unit Sewer Connection Fee – Connection fee for previously un- served or expanded lots $840.00per acre or portion thereof SewerAvailability Fee– New or Additional Units The units are based on the MetropolitanCouncil’s formula for calculating new sewer availability charge(SAC) units $ 825.00 per unit Sewer Permits – Service Installation/Alternations/Repairs/Re -sinspection (Regular Business Hours) Per inspection $60.00 Sewer Permits –Plan Review Fee Set by Inspector SewerPermits –AfterHours Inspection or Re-inspection Call-out rate per visit, minimum of 2 hours $100.00per hour Sewer Permits – Holiday Inspection or Re-inspection Call-out rate per visit, minimum of 2 hours $150.00per hour Sewer Access Charge Set by Met Council Annually $2,485.00 (Contact Met Council) SanitarySewerUtility Prohibited Sump Pump Connection Surcharge $100.00 per month Page 8 of 16 IX.Miscellaneous/Retail Activities Boutique/Garage Sales Application/notificationof City Hall required No charge Mobile Food Unit/Food Truck Permit (Resident Permit) Application/notification of City Hall required No charge. Limited to 2 parties/events per calendar year First Offense (for no permit)Issuance of Warning Second Offense (for no permit)Administrative Fine $100 Tent Permit $55.00+State Surcharge Sidewalk Sales $53.00 BusinessLicensing– Amusement Facilities Includes arcade, dance hall, movie theater, pool/billiard tables, bowling alleys, indoor tennis, skatingfacility,outdoor tennis, driving ranges, etc. $105.00 BusinessLicensing– Wholesale Bulk Fuel Storage Liabilityinsurancerequired $210.00 Business Licensing –Hotel/Motel $6.50 per room BusinessLicensing– Courtesy Bench, Non-advertising $26.00 BusinessLicensing– Courtesy Bench, Advertising $79.00 Business Licensing – Mechanical/ElectronicDevices Includes musical devices, amusementrides,bowling alleys, etc. $15.00 perlocation + $15.00 per machine (MN Statute 449.15 sets maximum permit fee at $15 per location and $15 per machine) Business Licensing – Retail Sales Includes antique shops, beauty/barber shops, boat dealers, Christmas tree sales, dry cleaning, laundry, bakery, candy, meats, wholesale foods, caterers, motor vehicle sales, optometrist, mortuary, video sales/rentals, over-the- counter tobacco sales, vending machines (excluding tobacco), & other retail goods not listed $53.00 BusinessLicensing –Restaurants, Cafes, Coffee Houses, etc. $21.00 up to1,000 square feet $42.00 for 1001-2000 square feet $63.00 for 2001-3000square feet (etc.) BusinessLicensing –Restaurants, Drive-Thru $315.00 BusinessLicensing– Service Stations $105.00 Business Licensing – Grocery $21.00 up to 1,000 square feet $42.00 for 1001-2000 square feet $63.00 for 2001-3000square feet (etc.) BusinessLicensing– Mobile Food Units/Food Trucks (Vendor License) $30.00 temporary (7 days or less) or $100 annual (8 days or more) Page 9 of 16 Charitable Gambling Permit – Per Minnesota State Statute, Chapter 349 Includesinvestigationfee Local Gambling Tax Lawful Gambling Fund $158.00 3% of organizations’ gross receipts from all lawful gambling,less prizes paid out 10% of net profits Tobacco Sales License Includes investigation fee $300.00 FireworksSales As part of existing business $100.00 (MNStatute 624.20 sets maximum permit fee at $100.00) FireworksSales Exclusive Business $350.00 (MNStatute 624.20 sets maximum permit fee at $350.00) MassageTherapist Annual Fee, Includes investigation fee $53.00 MassageTherapist Establishment Annual Fee,Includes investigation fee $158.00 RecreationalOutdoorArchery Range $200 first year $50 annual renewal Solicitors, Peddlers, Transient Permit – For-Profit Organizations Please reference Section 340 of the Municipal Code for more information $158.00 background investigation + $105.00per month permit fee Solicitors,Peddlers,Transient Permit – Non-Profit Organizations Please reference Section 340 of the Municipal Code for more information No charge Tree Contractor License $50.00 X. Signs Initial Fee Per Sign $100.00 PermanentSigns,Annual Renewal Per Sign, 100 square feet or less (maximum allowable size) $25.00 Temporary Signs $50.00 Signs,Impoundment First Offense $50.00 Signs,Impoundment Second Offense $75.00 Signs,Impoundment Third Offense $150.00 XI.Miscellaneous Fees/Permits Rubbish Hauler Annual $158.00 Recycling Hauler Annual $158.00 Contractor License Annual $75.00 Miscellaneous Permit Fee For all other permits not listed $40.00 Staff Research $53.00 per half hour Penalties for Late Payment Failure to pay any penalty imposed shall be grounds for the suspension or termination of any license issued by the City 10% of license fee or $32.00, whichever is greater Tobacco Sales,Illegal First Offense $600.00 TobaccoSales, Illegal Second Offensewithin36 months $1,200.00 TobaccoSales, Illegal Third Offense or any subsequent violation within 36 months of initial violation $2,000.00 and not less than a 7 business day suspension and may be revoked Candidate Filing Fee $2.00 Page 10 of 16 Insufficient Funds/ Returned Check Fee $35.00 Rental Registration/Renewal Fee $45.00 per rental unit Rental Renewal Late Fee Forrenewalsreceived after January 31 $90.00 per rental unit ResidentialContractorLicense Check $5.00 Business SubsidyApplication Fee Required toreimburse City for full cost of review $2,100.00 + $10,500.00 escrow Construction Activity Waiver Per Waiver Application $263.00 XII. False Alarm Fees False Alarm First two alarms No charge +letter False Alarm Three through ten alarms $100.00 per alarm False Alarm Over ten alarms $300.00 per alarm XIII. Investigation Fees Tobacco, Liquor, Charitable Gambling,& Solicitor’sPermits $158.00 XIV.Utility Use Charges Water Per Quarter: Meter Charge 3/4”Meter Size or Smaller $44.69 Meter Charge 1”Meter Size $111.72 Meter Charge 1.5”Meter Size $223.45 Meter Charge 2”Meter Size $357.50 Meter Charge 3”Meter Size $670.34 Meter Charge 4”Meter Size $1,117.24 Meter Charge 6”Meter Size $2,234.48 Meter Charge 8”Meter Size $3,575.16 Meter Charge 10”Meter Size $5,139.30 Meter Charge 12”Meter Size $9,608.25 Consumption: 1-10,000gals. gallons $3.56 per1,000gallons (pro-rated) Consumption:10,001-35,000 gals.gallons $4.58per 1,000 gallons (pro- rated) Consumption: Over 35,000gals. gallons $8.10 per 1,000 gallons (pro- rated) Water Test Fee set by MN State Health Dept $2.43 per quarter Sanitary Sewer Per Quarter: Base Charge –All Users per unit (with the exception of mobile homes) $66.96 Usage per gals. – Single Family/Multiple Family gallons $6.90 (per 1,000 gallons) SanitarySewer–Commercial Apartment/Condominium gallons $6.90 (per 1,000 gallons) Sanitary Sewer -Mobile Home per unit $184.26 A Winter Averaging minimum will be set using a standard usage of 100 gallons per day based on a 30 day month: 100 gallons x 30 days x 3 months = 9,000 gallons per quarter. For April to December quarterly sewer billings, residential usage will be based on the lesser of actual consumption or 9,000 gallons for those customers that were assigned the minimum amount. Customers that have a Winter Average amount greater than 9,000 gallons will be billed on the lesser of actual consumption or their Winter Average consumption. Customers not connected to City water will be billed on 9,000 gallons each quarter. Page 11 of 16 Surface Water Per Quarter: Residential -Single Family per lot $17.39 Residential –Multiple Family per dwelling $22.55 Apartment /Condominium per acre $141.97 Industrial /Commercial per acre $221.66 Undeveloped per acre N/A Standby Per Quarter: Standby 1”Service Line or smaller $10.41 Violation of Water or Sewer Use Restrictions: Non-essential usage charge $300 per day XV. Recycling Fee PerResidentialParcel with curbside recycling Annual $60.00 PerResidentialParcel without curbside recycling Annual $3.50 XVI. Park Development Park Development Fee Per residential unit $6,500.00 MINNESOTA STATUTES 2023 326B.153 326B.153 BUILDING PERMIT FEES. Subdivision 1. Building permits. ( a) Fees for building permits submitted as required in section 326B.107 include: (I)the fee as set forth in the fee schedule in paragraph (b) or as adopted by a municipality; and (2)the surcharge required by section 326B.148. (b)The total valuation and fee schedule is:(l)$1 to $500, $29 .50; (2)$501 to $2,000, $28 for the first $500 plus $3. 70 for each additional $ I 00 or fraction thereof, to and including $2,000; (3)$2,001 to $25,000, $83.50 for the first $2,000 plus $16.55 for each additional $1,000 or fraction thereof, to and including $25,000; (4)$25,001 to $50,000, $464.15 for the first $25,000 plus $12 for each additional $1,000 or fraction thereof, to and including $50,000; (5)$50,001 to $100,000, $764.15 for the first $50,000 plus $8.45 for each additional $1,000 or fraction thereof, to and including $100,000; (6)$100,001 to $500,000, $1,186.65 for the first $100,000 plus $6.75 for each additional $1,000 or fraction thereof, to and including $500,000; (7)$500,001 to $1,000,000, $3,886.65 for the first $500,000 plus $5.50 for each additional $1,000 or fraction thereof, to and including $1,000,000; and (8)$1,000,001 and up, $6,636.65 for the first $1,000,000 plus $4.50 for each additional $1,000 or fraction thereof. (c)Other inspections and fees are: (1)inspections outside of normal business hours (minimum charge two hours), $63.25 per hour; (2)reinspection fees, $63.25 per hour; (3)inspections for which no fee is specifically indicated (minimum charge one-half hour), $63.25 per hour;and (4) additional plan review required by changes, additions, or revisions to approved plans (minimum charge one-half hour), $63.25 per hour. (d) If the actual hourly cost to the jurisdiction under paragraph (c) is greater than $63.25, then the greater rate shall be paid. Hourly cost includes supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved. Subd. 2. Plan review. Fees for the review of building plans, specifications, and related documents submitted as required by section 326B.106 must be paid based on 65 percent of the building permit fee required in subdivision 1. Official Publication of the State of Minnesota Page 12 of 16 Revisor of Statutes 326B.153 MINNESOTA STATUTES 2023 2 Subd. 3. Surcharge. Surcharge fees are required for permits issued on all buildings including public buildings and state licensed facilities as required by section 326B.148. Subd. 4. Distribution. (a) This subdivision establishes the fee distribution between the state and municipalities contracting for plan review and inspection of public buildings and state licensed facilities. (b)If plan review and inspection services are provided by the state building official, all fees for those services must be remitted to the state. ( c)If plan review services are provided by the state building official and inspection services are provided by a contracting municipality: (1)the state shall charge 75 percent of the plan review fee required by the state's fee schedule in subdivision 2; and (2)the municipality shall charge 25 percent of the plan review fee required by the municipality's adopted fee schedule, for orientation to the plans, in addition to the permit and other customary fees charged by the municipality. ( d)If plan review and inspection services are provided by the contracting municipality, all fees for those services must be remitted to the municipality in accordance with their adopted fee schedule. History: 2009 c 78 art 5 s ll; 2017 c 94 art 2 s 5 Official Publication of the State of Minnesota Revisor of Statutes Page 13 of 16 MINNESOTA STATUTES 2023 326B.148 326B.148 SURCHARGE. Subdivision 1. Computation. To defray the costs of administering sections 326B.10 I to 326B.194, a surcharge is imposed on all permits issued by municipalities in connection with the construction of or addition or alteration to buildings and equipment or appurtenances after June 30, 1971. The commissioner may use any surplus in surcharge receipts to award grants for code research and development and education. If the fee for the permit issued is fixed in amount the surcharge is equivalent to one-half mill (.0005) of the fee or $1, except that effective July 1, 2010, until June 30, 2015, the permit surcharge is equivalent to one-half mill (.0005) of the fee or $5, whichever amount is greater. For all other permits, the surcharge is as follows: (1) if the valuation of the structure, addition, or alteration is $1,000,000 or less, the surcharge is equivalent to one-half mill (.0005) of the valuation of the structure, addition, or alteration; (2) if the valuation is greater than $1,000,000, the surcharge is $500 plus two-fifths mill (.0004) of the value between $1,000,000 and $2,000,000; (3) if the valuation is greater than $2,000,000, the surcharge is $900 plus three-tenths mill (.0003) of the value between $2,000,000 and $3,000,000; ( 4) if the valuation is greater than $3,000,000, the surcharge is $1,200 plus one-fifth mill (.0002) of the value between $3,000,000 and $4,000,000; (5) if the valuation is greater than $4,000,000, the surcharge is $1,400 plus one-tenth mill (.0001) of the value between $4,000,000 and $5,000,000; and (6) if the valuation exceeds $5,000,000, the surcharge is $1,500 plus one-twentieth mill (.00005) of the value that exceeds $5,000,000. Subd. 2. Collection and reports. All permit surcharges must be collected by each municipality and a portion of them remitted to the state. Each municipality having a population greater than 20,000 people shall prepare and submit to the commissioner once a month a report of fees and surcharges on fees collected during the previous month but shall retain the greater of two percent or that amount collected up to $25 to apply against the administrative expenses the municipality incurs in collecting the surcharges. All other municipalities sha11 submit the report and surcharges on fees once a quarter but shall retain the greater of four percent or that amount collected up to $25 to apply against the administrative expenses the municipalities incur in collecting the surcharges. The report, which must be in a form prescribed by the commissioner, must be submitted together with a remittance covering the surcharges collected by the 15th day following the month or quarter in which the surcharges are collected. A municipality that fails to report or submit the required remittance to the department in accordance with this subdivision is subject to the remedies provided by section 326B.082. Subd. 3. Revenue to equal costs. Revenue received from the surcharge imposed in subdivision 1 should approximately equal the cost, including the overhead cost, of administering sections 326B.101 to 326B. l 94. History: 1984 c 544 s 75; 1Spl985 c 13 s 127; 1989 c 303 s l; 1989 c 335 art 4 s 1 1; 1991 c 2 art 7 s 5; 1994 c 634 art 2 s 7; 1995 c 254 art 2 s 13; 1997 c 202 art 2 s 26; 1Sp2001 c JO art 2 s 31; 2002 c 317 s 2; 2007 c 135 art 2 s 5; 2007 c 140 art 4 s 13,61; art 13 s 4; 2009 c 101 art 2 s 109; 2010 c 215 art 8 s JO; 2010 c 280 s 19,20; 1Sp2011 c 4 art 3 s 8; 2012 c 289 s 5 Official Publication of the State of Minnesota Page 14 of 16 Revisor of Statutes ELECTRICAL PERMIT FEES HOMEOWNERS AND CONTRACTORS:Complete an electrical permit form available from the Building Inspections Division. Add $1.00 for State surcharge to total cost of each permit. The fee is the total of the listed fees or the total number of inspection trips x $.00, whichever is greater. Residential panel replacement is $110.00, sub panel $.00. New service or power supply is: Circuits and Feeders 0 to 300 Amp $55.00 0-100 Amp $9.00 400 Amp $71.00 101-200Amp $15.00 Add $16.00 for each additional 100 amps Minimum Fee: Minimum permit fee is $.00 plus $1.00 State surcharge. This is for one inspectio only. Minimum fee for rough-in and final inspection is $.00 plus $1.00 State surcharge. Add $6.00 for each additional 100 amps Maximum Fee: Maximum fee for single family dwelling or townhouse not over 200 amps (No max if service is over 200Amps) is $.00 plus $1.00 State surcharge. Maximum of 2 rough-in’s and 1 final inspection. (Failed inspections are an additional $.00 each) Apartment Buildings Fee per unit of an apartment or condominium complex is $0.00. This does not cover service, unit feeders or house panels. $0.00 plus circuits at $9.00/each. This includes 2 inspections. $0.00 this include up to 10 circuits and 2 inspections The Greater of $55.00 for panel plus $9.00 per circuit or $0 for 2 inspections. $5.00 per each standard $5 up to 10kva, $4 11 to 74kva, $60 75kva to 299kva, over 299kva is $165 Swimming Pools and Hot Tubs Additions, Remodels or Basement Finishes Residential Accessory Structures Street and Parking Lot Lights Transformers and Generators Retrofit Lighting Sign Transformer or Driver Low voltage fire alarm, low voltage heating and air conditioning control wiring Re-Inspection Fee in addition to all other fees $.00 Solar fees: 0kw to 5kw = $90 5.1kw to 10kw = $150 10.1kw to 20kw = $225 20.1kw to 30kw = $300 30.1kw to 40kw = $375 40.1kw and larger is $375 plus $25 for each additional 10kw Electronic inspection fee for these items only; furnace, air conditioning, bath fan, fireplace or receptacle for water heater vent is $40. Refunds must be requested in writing. No refunds unless more than the minimum fee. Refunds are minus the cities 20% handling fee. THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED. Commercial Electrical Fees: $50 per trip or by valuation of 0.75%, whichever is greater Carnival fee is $90 for one hour, $50 per ride or concession and the generator at $60 for 75kva to 299Kva, $165 300kva or higher. Solar fees for PV system: 0 - 5,000 watts $90 >5,000 watts to 10,000 watts $150 >10,000 watts to 20,000 watts $225 >20,000 watts to 30,000 watts $300 >30,000 watts to 40,000 watts $375 Additional increments of 10,000 watts $25 (for each additional $10K increment) Minimum fee permits expire in 6 months. Permits over the minimum fee and up to $250 expire in 1 year. The State surcharge is .0005 times the project value