CALL TO ORDER
Mayor Probst callcd the meeting to order at 4:5] p.m.
Present: Council Members Beverly Aplikowski, David Grant, Lois Rem, and
Gregg Larson,
.
Also present: Administrator, Joe Lynch; Operations and Maintenance
Director, Tom Moore; City Planner, Aaron Parrish, City Accountant, Terry
Post; Recreation Program Supervisor Michelle Olson; City Engineer, Greg
Brown; and Deputy Clerk, Cynthia Young.
School District #621 Transportation Discussion
Mayor Probst introduced Mounds View School District #621 School Board
Member Barb Bollum, and School Board Chair Dr. Jan Witthuhn,
Ms, Bollum reported that of the current budget cutting in the district, most cuts are
occurring in areas other than directly in the class room, She stated class sizes are
already large. She noted that of three community meetings relating to with
transportation and extra curricular activities, 30 teaching positions and building
support staff cuts were made. She explained, regarding the recent bus controversy,
the district is allowed by law to charge a fee to anyone who lives further than two
miles from schools.
Ms, Bollum said the response at the community meetings was, a) Increase class
. sizes or do something concerning transportation because it did not affect class size,
.
.
.
ARDEN HILLS CITY COUNCIL WORK SESSION MINUTES
MAY 20, 2002
2
b) Limit the number of roads which have hazardous crossings, c) Students who
have to cross where there are entrances to major roadways wi]] be bussed. She said
the transportation department would send out letters to residents that week as to
whether they are in or out of the 2-mile limit.
Council Member Grant expressed his concern for the lack of bussing more
students.
Council Member Larson said although this policy does put the City Council at a
disadvantage, the safety issue is paramount.
Ms. Bo]]um said the clear fact in this matter is there is no funding, and the trade-
offis increasing class sizes.
Council Member Aplikowski asked what the current class sizes were, and if
crossing guards were being utilized,
Ms, Bollum said the high school averages were 36-39 students per class, middle
school 30-35, and elementary was 20-29,
Accountant Post asked if Community Education programs could provide some
funding, to which Ms. Bollum replied, "No,"
Council Member Grant said other cities had adopted this 2-mile walk, but Arden
Hills does not have any sidewalks, which ultimately puts kids on the street and at
risk.
Council Member Larson asked if there had there been discussion of closing any
schools,
Dr, Witthuhn replied that because neighborhoods were spread out all over, the
district was locating offices in schools, and the result was to maximize space, and
not close a school.
Council Member Grant indicated he heard that Mounds View High School could
have provided 200 more parking spots. He stated with the lack of bussing, there
would be an increase of parking on City Streets.
.
I.
.
ARDEN HILLS CITY COUNCIL WORK SESSION MINUTES
MAY 20, 2002
3
Dr. Witthuhn said this issue is a growing challenge with a less sense of common
good that is becoming more and more difficult, every year with the constant
criticism from the Taxpayers League.
Council Member Aplikowski expressed her concern regarding schools funding
special services such providing an excess oflanguage instructors.
Dr. Witthuhn and Ms. Bollum urged the City Council to keep abreast of related
events through the media and invited the Council to attend any pertinent meetings,
TCAAP - GSA
Mayor Probst introduced John Kelly (Washington D,C,), Ralph Connor (Boston),
and Bill Burney, (Department of Army), program managers from GSA, Mayor
Probst said the focus is on the early transfer of authority,
Mr. Burney said one big change since the last meeting is that the Anny has
resolved the issue of the 276 acres, which, when transfen-ed out of government
ownership, a wan-anty is issued. He noted any early transfer demands a clean-up
schedule, stating this does not mean Army is relieved of its liability, He explained
that special legislation is not going to get the property transfen-ed to Arden Hills
any sooner.
Mr. Connor asked what steps Arden Hills need to take to get approval for this
process, He said delays are most always tied to the environmental commission. He
explained the question is can you have development occur simultaneously with
clean-up.
Mayor Probst said the vision for city is to run a parallel path and work the transfer
process along in 24 months, if possible. He said the City would like to bring along
the community with some degree of confidence,
Mr. Connor noted the City is off to a great start by working with a master
developer.
The Mayor asked if a formal request was recommended at this point.
.
.
.
ARDEN HILLS CITY COUNCIL WORK SESSION MINUTES
MAY 20, 2002
4
Mr. Kelly said once the property is handed over to GSA, GSA will do screening
with civilian agencies, then cities and townships can lay claim to the sites.
Council Member Larson asked iflegislation dictated the level of clean-up,
Mr. Connor said there was not enough money to clean-up the site to pristine levels,
and generally, the government will clean-up to commercial level.
Mr. Kelly said the issue the government is dealing with is the government can
clean-up this property and make the most advantageous plan in the shortest amount
of time, and whether the it is valuable to bring a third party in on the clean-up.
Council Member Grant inquired if a well-articulated plan would secure the City's
development rights,
Mr. Kelly said yes, a well defined plan with an overlay is desirable, but keep it as
one parcel, with no disjointed land issues. He noted many agencies are not
interested in developing land that is not pristine.
Council Member Larson asked ifthere is any residual liability,
Mr. Burnes said, yes, the government is always responsible for what it did, but the
City would be responsible for contamination subsequent to development.
Mr. Connors said the government ultimately responsible, and insurance can be an
issue, but the more the variables can be defined, cities can be insured against that.
Mr. Kelly stated the Department ofthe Army is determining that this property is no
longer of any need with the Next being site characterization, as early as 30 days
from now. He said after a staging plan is presented, a 60-day public body screening
would occur. Within 120 days, the City could begin serious negotiations with the
government.
2.A Indykiewicz Parcel Discussion
Broker Rob Davidson said he had been working with Arden Hills for several years,
noting this is a very challenging site, coming to the general conclusion that the
appraisal is f1awed,
.
ARDEN HILLS CITY COUNCIL WORK SESSION MINUTES
MAY 20, 2002
5
Mayor Probst askcd what the likelihood is for this property.
Mr. Davidson said, "As it sits right now, thc short-term for retail is dismal and he
did not see it happening. This site is not going to support a large office use."
Planner Parrish asked, from a marketing perspective, what uses will work on this
site.
Mr. Davidson suggested convenience store/gas/sandwich may be an appropriate
retail use, further stating this is a very limited market site.
Mr. Post asked how the use would change the value of the site.
Mr. Davidson said retail use would support the appraised value, but clearly any
upgrade to the neighborhood would hold a positive impact on the site, although
short term retail on the site will not work.
. Council Member Larson asked what Mr. Davidson's strategy would be?
.
Mr. Davidson said development on the end of W, Round Lake Road mayor may
not impact in an appreciable way, He said he understood the convenience store
idea is not acceptable, noting an office use on the site could occur because of a
good value on the land, The fact that the bridge is going to be repaired and the high
power lines could cause an issue, stating again, this is a very challenging site.
Mayor Probst suggested further discussion with Chesapeake regarding this site.
1-694 Desil!n Guidelines
Planner Parrish said anything outside the presented manLlal and the cost sharing
element is available for review,
2.B Finance Department
Mr. Post requested City Council comments concerning the Capitol Improvement
Plans he had submitted in his report.
ARDEN HILLS CITY COUNCIL WORK SESSION MINUTES
MAY 20, 2002
6
.
Administrator Lynch said the tanker truck funding should continue, and regarding
the Operations and Maintenance video camera, he was hearing that the City should
be more aggressive with this approach.
Planner Parrish said it could be as early as March, at a minimum, assessment of our
current water quality.
The Mayor asked what the consequences would be.
Planner Parrish suggested some permits may be withheld.
Mr. Moore said, regarding the video camera -staff received notice today of another
claim, and said the City does not have the proper equipment, and without it, the
problem is becoming unmanageable. In response to the League of Minnesota
Cities, the City cannot justify that they are managing and maintaining the City's
system. He explained that a "predator" is a cutting tool which will allow the City to
be self-contained.
. Council Member Larson asked how many surrounding communities have this
equipment.
Mr. Moore stated all surrounding communities own this equipment.
Mayor Probst said the issue is not just the cost of camera, but training cost
involved and staffing issues, as well.
Mr. Moore said URS would review the films with City personnel, therefore the
City will do the work, eliminating the "middle-man",
Council Member Larson said he was comfortable with the camera purchase,
especially because other communities have also made this investment, but he was
not comfortable with the purchase of a new truck at this time,
Mr. Moore explained that the current vehicle had a host of problems including the
brakes are not correct, the gauges are malfunctioning, but that he still can make the
current truck run,
. Council Member Grant inquired about the all season plow,
.
.
.
ARDEN HILLS CITY COUNCIL WORK SESSION MINUTES
MAY 20, 2002
7
Mr. Moore said this equipment could clear all trails, brush-clean all trails, and
clear-cut trails in one trip.
Mr. Post said the recreation fund/long term balance continues to shrink.
Mayor Probst said it might be helpful to have an annual summary by each
department.
Council Member Larson suggested a range of fee increases for recreation programs
in order to compensate for what is not being subsidized by charitable gambling,
Ms, Olson said she had made overall cuts where she can.
Council Member Larson suggested funding half of recreation out of the "general
fund."
Mayor Probst suggested a line item on the budget for expenditures for maximum
levy increase.
Engineers Report
Regarding Hunters Court and Waldon Place, Council Member Larson said he was
wondering if taking on two neighborhoods is too much to take on at one time,
Engineer Greg Brown said should to invest in some neighborhoods in order to keep
up with the needs.
Mr. Post said the City should address the notification early on for the 2004 PMP.
Council Member Rem asked for more information to neighborhoods be
forthcoming stating timing on these projects is uppermost.
Mayor Probst suggested a reasonable level of expenditure by full reconstruction of
streets and mill/overlay of the remaining street, sensing Ingerson and Karth Lake
as projects to bring back to City Council for discussion,
.
.
.
ARDEN HILLS CITY COUNCIL WORK SESSION MINUTES
MAY 20, 2002
8
c.t Maintenance Facilitv Task Force
Mayor Probst asked if the City should order an appraisal of the current
Maintenance Facility property,
Council Member Grant suggested there might be a drastically different appraisal of
the proposed Maintenance Facility property based upon the future of TCAAP, He
said a number of parties have shown an interest in the current facility.
Council Member Larson said he was apprehensive regarding the facility, and the
site line barriers, stating it is a large building, with potential residential uses which
may be affected by the decision.
Planner Parrish said at an earlier meeting, Ramsey County discussed some space
constraints.
Council Member Larson suggested viewing the Hennepin County facility to use as
a benchmark.
E.t Council Chamber Signage
Deputy Clerk Young presented the Arden Hills logo slgnage designed by
FASTSIGNS, Inc.
Council Member Grant asked if another material could be used.
Ms, Young eXplained that due to the curvature of the wall surface, metal, which is
flexible, was the recommendation,
The Council Members agreed to the proposal and asked that it be brought forth as a
consent item at the next City Council Meeting,
.
.
.
ARDEN HILLS CITY COUNCIL WORK SESSION MINUTES
MA Y 20, 2002
9
E.2 2002 Personnel Policy
Deputy Clerk Young presented the draft 2002 Personnel Pohcy,
Council Member Larson requested similar language in the harassment section and
equal opportunity section be adjusted.
The City Council directed staff to bring to the May 28, 2002 meeting as a consent
item.
Council Comments
Mayor Probst adjourned the meeting at 10:30 p.m.
Respectfully submiyted, Cynthia Young - Deputy Clerk