MINUTES
CITY OF ARDEN HILLS, MINNESOTA
REGULAR CITY COUNCIL MEETING
March 14, 1994
7:30 P.M. - New Brighton City Hall
CALL TO ORDF.R IROJ ,L CALL
Pursuant to due call and notice thereof, Mayor Sather
called to order the City Council meeting at 7:30 p.m.
Present: Councilmembers Beverly Aplikowski, Dale Hicks,
Dennis Probst and Paul Malone. Also present were: City
Engineer, Terry Maurer; Public Works Superintendent, Dan
Winkel; City Accountant, Terry Post; City Administrator,
Dorothy Person; and Recording Secretary, Renee Kaulfuss.
ADOPT AGENDA
MOTION:
Hicks moved, seconded by Aplikowski, to adopt the
March 14, 1994 agenda as presented. Motion carried
unanimously (5-0).
PTlRT,Tr' HEARING - 1994 PAVEMENT MAINTENANCE
IMPROVEMENT PRO,TF.CT
Mayor Sather opened the public hearing at 7:31 pm for the
purpose of conducting a public hearing on the 1994
Pavement Maintenance Improvement project. He stated the
purpose of this hearing was to receive input with regard
to the 1994 Pavement Maintenance Program. He explained
the procedure for the hearing would be that the Public
Works Superintendent would make a presentation with
regard to the 1994 Pavement Maintenance Program, then
Council and the public would be invited to comment or ask
questions. He instructed anyone wishing to speak to sign
the guest register, after which their names would be
called in the order listed.
Public Works Superintendent Dan Winkel explained the
Street Rating Schedule which is based on scores from 0-
100. Winkel further explained that rating of City
streets involves periodic examinations to determine the
condition of the streets and then a recommendation to
Council is made by the City Engineer, with input from the.
Public Works Department, as to the best available means
of protecting each street and extending its useful life.
Winkel noted the streets being proposed for improvement:
.
.
.e
.
.
.
.
.
.
..
.
.
.
.
.
.
.
..
.
Arden Hills Council
2
March 14, 1994
Strp-p-ts to be reconstructed
Amble Drive from Lexington Avenue to Karth Lake Drive
Bussard Court from Old Snelling Avenue to West End
Dunlap Street from Ingerson Road to Cannon Avenue.
Street to be recycled
Keithson Drive from State Highway 96 to South End
Winkel noted the composite ratings of these streets taken
last fall. Winkel provided a brief overview of where the
borings were taken from each street. He explained the
description by definition of reconstruction and
recycling. The estimated street reconstruction costs are
proposed to be $368,300, and the recycling cost for
Keithson Drive is estimated to cost $26,500.
Winkel announced that this evening, estimated assessment
amounts can be provided, however the actual assessment
hearing on this matter is scheduled to take place in May
1994; at that hearing, the public will have an
opportunity to specifically discuss matters relative to
assessments.
Winkel explained that the City's Assessment Policy calls
for reconstruction and recycling work to be paid 50% by
the City and 50% by the benefitting property owners, on a
front footage basis. He explained the method of
calculating assessments for corner lots or lots abutting
other streets which have been improved and assessed.
Winkel noted that in the past, the approximate costs for
reconstruction is $30.00 per linear foot of frontage and
$11.04 per linear foot of frontage for recycling.
Winkel reviewed the schedule for the 1994 Pavement
Maintenance Program, which called for 1) Opening Bids on
AprilS, 2) Receive Bids/Order Assessment Hearing, April
11, 3) Hold Assessment Hearing and Award Contract on May
31, 4) Begin Construction in June 1994, and 5) Completion
of the project in September 1994.
Mayor Sather advised the public that if an individual
property is assessed more than a $500 assessment, the
assessment will be payable over a five year period with
interest; if an individual property is assessed less than
a $500 assessment, the assessment will be payable over a
three year period with interest. He added that there
would be no interest applied if the assessment was paid
in full within thirty days of the assessment hearing.
I
I
I.
I
I
I
I
I
I
I.
I
I
I
I
I
I
I
Ie
I
Arden Hills Council
3
March ~4, ~994
Names were
register.
verbatim) :
called in the order listed on the guest
Comments made by citizens are as follows (not
Hetty Farr. 3327 North Dunlap - She stated she cannot
afford another assessment like what happened to her with
Tiller Lane two years ago. An overlay or patch would be
reasonable.
Albert Nienaber. 1160 Amble Drive - He asked who was
responsible for the inspection of the poor compaction of
the original road, the City, the contractor or the
developer. Secondly, he noted that because the drainage
in the area goes directly into Karth Lake, the soft wet
clay present on this road causes contamination of the
lake. He suggested that this is a poor arrangement and
perhaps this would be an ideal time to change the sewer
direction.
Tim Bryne. 3390 North Dunla~ - He asked how far past
Cannon will the reconstruction take place, and where does
Dunlap actually end. There are two homes at the end.
Mr. Winkel stated the project will stop at the double
wide area (32 feet wide) unless the residents would want
the road to continue, however, further discussion would
be needed.
Judy Tekautz. 33~9 North Dunlap - She stated the street
serves a purpose without curb and gutter.
Engineer Maurer explained that the City's long range goal
is to have curb and gutter along all City streets. He
further explained that curb and gutter provide a better
drainage flow, and it protects the end of the
blacktopping from cracking and allowing water to seep in.
The straight line cut helps keep vehicles off the edge of
lawns.
Gilbert Smith. ~~76 Amble Drive - He stated that the base
materials used during the original construction of this
road were inferior, and someone should be liable. If it
was constructed properly in ~978/79, this road would have
held up longer.
Engineer Maurer noted that one possible cause for the
road deteriorating was the weather conditions present at
the time of the construction. Engineer Maurer further
noted that the contractor met all the proper
specifications that were noted at that time.
.
.
.e
.
.
I
I
I
I
Ie
.
I
I
I
I
I
I
Ie
I
Arden Hills Council
4
March '14, 1994
Pat Hrown. 1301 Cannon - He stated his question was
already addressed.
Tom Hp.idp.man. 1142 Amblp. Drive - He addressed the quality
issue once again and noted that their should be someone
liable for the poor conditions of the road.
Jon Handlos. 3380 North Dunl~ - He asked what can be
done to ensure that quality workmanship and proper
specifications are met.
Julianne & Stephen Prager. 3320 North Dunlap - They both
agreed that the street is badly broken up and are in
favor of the project.
Grea Schmitz. 1471 Bussard Court - He noted that the
street dips at the end of the cul-de-sac. He asked
whether the project would end there, or two or three feet
behind the blacktop area. He was concerned as he
replaced his driveway last year.
Engineer Maurer noted that the level of finish of the
reconstructed materials will come very close to matching
with the old blacktop materials.
Arthur T,arsen 11 AD Karth Lake Drive - He noted he has
seen stakes in the area and if these stakes mark the area
where the reconstruction will take place. If this would
be correct, it appears that this street will be widened.
Engineer Maurer noted that the surveyors are working in
the area locating driveways, and taking some pictures of
elevations. Maurer further noted that the road would
remain at the same width.
Howard Hanson. 1131 Amble Drive - He noted that his
comments have already been stated. He further noted he
was considering putting in a new driveway and should he
have the driveway installed before or after the street
reconstruction project?
Maurer suggested to wait until after the City's project
is completed as the driveway contractor would be able to
obtain a smoother alignment.
Bruce and Lynn Mp.arR. 4~03 Keithson Drive - Ms. Mears
noted that there is undeveloped property behind this
development and asked whether the recycling project being
proposed could withstand large construction equipment
traffic?
.
.
..
.
.
.
.
.
I
I.
I
I
I
I
I
I
I
Ie
.
Arden Hills Council
5
March 14, 1994
Engineer Maurer stated the road would be able to
withstand normal traffic which would include garbage
trucks and school buses. If any future development would
take place in this area, another access would have to be
gained to this area. The project as proposed would not
be designed for heavy equipment.
Steve zilmer. Carol Perkins. 3363 North Dun]ap - He asked
what assessment amount was anticipated for his property?
Winkel stated he would review his parcel and get back to
him at a later date.
Kurt Lawrence. 4516 Keithson Drive - He referred to the
liability issue of a poorly developed road and who is
responsible. He asked what was the anticipated life
expectancy of a new street?
Maurer noted that it was a drought year when this road
was originally constructed. As moisture began to build
up as experienced in the past couple of years, the soil
began to consolidate causing recompaction of soil. He
further noted that due to the number of settlements on
this road, it cannot be leveled properly without the
recycling, and it would be physically impossible to
patch.
Jim Cox. 1287 Ingerson Road - Mr. Cox asked what quality
control measures would be taken to ensure the safety of
children. He noted that since construction would be
taking place during the summer months, children would be
playing around the heavy construction equipment. He
suggested that the project specifications include
stringent safety measures.
Maurer explained that his engineering firm would oversee
the project and that all parties abide by the acceptable
standards set by MNDOT to ensure safety. He further
explained that a contractor is allowed to phase in the
project in an economical manner, therefore there are
stages to the construction process.
Ron Nelson. 4504 Keithson Drive - He echoed the concerns
brought up by Mr. Lawrence. He too expressed the issue
of defective workmanship demonstrated by the former
contractor, and did not feel the total problem was due to
the drought year.
Engineer Maurer stated he did not mean to infer that the
drought was the reason for the defects in the road. He
only suggested this as one possible reason for the
deterioration.
I
I
.-
I
I
I
I
I
I
I.
I
I
I
.
I
I
I
Ie
I
Arden Hills Council
6
March 14, 1994
John Pattp-Tsp-n. 1434 Bussard Court - Mr. Pattersen asked
whether the engineer had considered leaving the existing
curb and gutter in place, and stated a recycle and
overlay would be appropriate and less costly.
Engineer Maurer stated that the cost savings to taxpayers
would be minimal as it would take many man hours to
remove the existing asphalt and base.
Councilmember Malone noted that the City, as well as, the
affected residents would pay the premium to work around
the current curb and agreed there would not be a
significant savings. He further noted that if the
contractor would try and save the existing curb and it
was determined it was not working, the contractor would
need to start over from the beginning.
Engineer Maurer noted that there could be a quick
determination made as to whether there is clay soil under
this area, if it is granular and whether there is any
sign of vertical separation.
Cliff Royum. ]426 Bussard Court - Mr. Boyum echoed the
same concerns raised by John Pattersen.
Mayor Sather closed the public hearing at 8:18 pm.
Mayor Sather noted that since many of the questions
raised this evening were regarding assessment costs, he
asked Councilmember Malone to address the assessment
procedure.
Councilmember Malone outlined the mechanical part of the
improvement process. He noted that as the City'S
infrastructure aged, the City needed to formulate a
procedure to handle the cost of repairing roads. The
City pondered over the idea of raising taxes to pay for
these expenses. The City agreed that it would be
reasonable to co-fund projects and more suitable for the
taxpayers affected by the improvements to share in the
cost of the improvements. The assessment procedure
incorporates a fair evaluation for persons with corner
and odd shape lots. The City has used this assessment
policy for approximately four years.
Councilmember Malone noted that an average lot would be
assessed based on front footage and that generally the
cost of a reconstruction would be approximately thirty
dollars ($30.00) per front footage; and recycling
approximately eleven dollars ($11.00) per front footage.
He further noted that the assessment amount can be paid
over a five year time period, unless the amount is under
I
I
.-
.
I
.
I
.
I
I.
I
.
I
.
.
.
.
.e
.
Arden Hills Council
7
March 14, 1994
five hundred dollars ($500) which would be paid over a
three year period. The affected propertyowner can pay
the assessment amount in it's entirety within the first
thirty days following the adoption of the final
assessment role without penalty.
MOTION:
MOTION:
Hicks moved, seconded by Aplikowski to approve
Resolution #94-24, approving the plans and
specifications and ordering the advertisement for
bids in the matter of the 1994 Pavement Maintenance
Improvement project. Motion carried unanimously (5-
0) .
Hicks moved, seconded by Probst to approve
Resolution #94-25, ordering the improvement in the
matter of the 1994 Pavement Maintenance Improvement
project. Motion carried unanimously (5-0).
APPROVAL OF COUNCIL MINUTES
Administrator Person noted on Page 4 of the February 28,
1994 Council minutes that the first paragraph, line four
should note acreage instead of density. Malone noted on
the same page, under heading of TCAAP Sanitary sewer
connection issue, fourth paragraph, to delete the
following: "and if the... " in sentence two, all of
sentences three, four and "answers to these questions",
under sentence five.
MOTION:
Malone moved, seconded by Hicks, to approve the
minutes of the February 17, 1994 Worksession as
prepared; and approve the minutes of the February
28, 1994 Regular Council Meeting as corrected.
Motion carried unanimously (5-0).
CONSENT CALENDAR
MOTION:
Hicks moved, seconded by Malone, to approve the
Consent Calendar and authorize execution of all
necessary documents contained therein. Motion
carried unanimously (5-0).
a. Approve Resolution #94-19, revising the
mechanical fee schedule.
b. Approve Resolution #94-23, designating
additional depositories for investment
purposes.
c. Approve Resolution #94-27, revising water
utility quarterly minimum rates by meter
size.
d. Approve Resolution #94-28, supporting Dare
Bike-a-thon, April 30, 1994.
I
I
I-
I
I
I
I
I
I
I.
I
I
I
I
.
.
.
.e
.
Arden Hills Council 8 March 14, 1994
e. Approve list of additional business
licenses.
f. Approve List of Claims/Payroll.
PUBLIC COMMENTS
There were no public comments.
UNFINISHED AND NF.W RTJSINESS
None noted.
ADMINISTRATOR COMMENTS:
None noted.
COUNCIL COMMENTS:
Councilmember Aplikowski noted that the Economic
Development Committee is in the process of mailing the
survey and letter to the businesses in the area. She
asked where the funds would be allocated to pay the
expense of this mailing. Person noted that she and the
Community Planning Coordinator had recognized that monies
can be taken from the planning and zoning budget. Malone
noted that Council would need to approve such funds for
reallocation.
councilmember Aplikowski referred to the notice in the
packet regarding a request for a City official to attend
the Girl Scout award's ceremony, and stated she would
attend if the Council concurred. Council concurred.
Councilmember Probst reminded the Council of the Second
Arden Hills' Community meeting at TCAAP on March 17, 1994
at 7:30 pm. He further noted that the publicity to date
has been reported fairly and is pleased with the
coverage.
ADJOURN:
MOTION:
Malone moved, seconded by
the meeting at 8:51 p.m.
unanimously (5-0).
Probst, to adjourn
Motion carried
Thomas R. Sather, Mayor Dorothy A. Person, City Administrator