HomeMy WebLinkAboutCCP 12-21-1992 ~ . ARDEN HILLS CITY COUNCIL WORKSESSION MEETING COUNCIL CHAMBERS MONDAY, DECEMBER 21, 1992, 4:30 P.M. 4:30 PM 1. CALL TO ORDERIROLL CALL. 2. AGENDA ADOPTION. 4:30 PM 3. REVIEW OF CITY'S PAVEMENT MANAGEMENT PROGRAM AND COUNTY CSA PLANS. 4:45 PM 4. CITY ENGINEER REPORT AND DISCUSSION OF STORM WATER UTILITY. 5:00 PM 5. CITY ENGINEER REPORT AND DISCUSSION OF T.H. 51 AND OLD SNELLING AVENUE. . 5:30 PM 6. DISCUSSION OF CITY HALL AND PUBLIC WORKS FACILITIES OPTIONS. 6:00 PM 7. REVIEW OF COMMITIEE APPOINTMENTS (CITIZENS) FOR 1993. 6:15 PM 8. DISCUSSION OF REPLACEMENT FOR COUNCILMEMBER JOANN GROWE. 6:30 PM 9. DISCUSSION OF RECREATIONAL VEHICLE AMENDMENTS TO ZONING CODE. 6:45 PM 8. COUNCIL COMMENTS. 7:00 PM 9. ADJOURN. . The above times may be subject to discussion of the issue. .YEC-16-92 WED 13:107 MAIER STEWART or. ASSOC. P.02 . rI/,I.;;' -.I- CONSULTING ENGINEERS Maier Stewart & Associates Inc. MEMO TO: City Council for December 21, 1992 Work Session FROM: Mark Graham, Maier Stewart & Associates, Inc. DATE: December 16, 1992 RE: Possible 1993 Street Maintenance Improvements FILE NO: 520-040.10 All streets were re-rated by members of the Public Works Staff this fall. Information was input into the City's Pavement Management Computer Program and lists were generated for streets requiring seal coating, overlaying or reconstruction. The computer ratings and field comments were used to formulate thcse recommendations. In addition, performing the same type of maintenance on streets within the same area generally allows lower bid prices, since the Contractor minimizes his travel time. . Following are lists that Public Works Supervisor Winkel and I developed based on the ratings, field comlTIcnts and group location of streets. We have shown the Iatings and estimated construction costs. For overlay improvements in residential areas, the City assessment policy allows for assessment of 50% of the total project cost to abutting homeowners. The assessment rate in 1991 was $2.82 pcr front foot. We would anticipate a 1993 rate of $3.00 to $3.25. For seal coating improvements, it has been City policy to not assess abutting property owners. We would not recommend a change in 1993 to this policy. The budgctcd amount for 1993 Street Maintenance Improvements is $110,000. PROPOSED 1.5" BITUMINOUS OVER LA Y IMPROVEMENTS ~ Emm 1'2 ~atinl: Est. Cost Karth Llike Circle Hamline Avenue 2nd Cui-de-sac S9 $ 24,000 Nursery Hill Lane Nursery Hill Ct. 400' North 73 $ 32,000 . Nursery Hill Court Nursery HilI Lane Cul-de-sac 73 $ 19,000 Amble Road Hamline Avenue Dead End 43 $ 21,600 Briarknoll Circle Snelling A venue Cul.de-sac 23 $ 18,500 1959 SLOAN PLACE, SUITE 200, sr. PAUL, MINNESOTA 55117 6120774-6021 9800 SHEI.ARO PARKWAY. SUITE 102, MINNEAPOLIS, MINNESOTA 55441 612.5<16.0432 . Equal OPPOtlu."y Employor , . D"E C - 1 Eo - 9 2 WED 13:08 MAIER STEWART :l> ASSOC. P..et3 . Briarknoll Drive Norma Avenue Briarknoll Cir. 35 $ 29,900 Norma Avenue Briarknoll Dr. 500' South 56 $ 9,800 Gale Circle W. Floral Dr. Cul-de-sac 44 $ 11,100 ]amcs Circle W. Floral Dr. Cul-de-sac 48 $ 17,100 Dellwood Ave. Nursery Hill Ct. Amble Road 60 $ 14.000 Total $197,200 Less Anticipated Assessments $ 47.000 Estimated Cost $1.50,200 We anticipate that the bidding process would reduce these costs. We recommend bidding this group, and, if necessary, eliminating Nursery Hill Court, Nursery Hill Lane and Dellwood Avenue to remain within the budget. By eliminating these streels, the estimated cost would be reduced to $99,000. It is far prefarable to plan and notify residents of a potenrial assessment, then delete the work, than it is to receive favorable bids and then add streets, which would require additional public hearings. PROPOSED SEAL COAT IMPROVEMENTS . S!r.W Emm Th Ratin~ Est. Cost Red FOlt Road Frontage Road Leltington Ave. 51 $ 10,800 Pine Tree Drive Harriet Avenue. Co. Road E 74 $ 4,800 Northwood Drive Red Folt Road Dead End 87 $ 2,900 Fcmwood Court Ingerson Road Cul-de-sac 86 $ 1,400 Ingerson Court Ingerson Road Dead End 93 $ 1,500 Edgewater Avcnue Lexington Ave. Dead End 97 $ 2,:'ioo Estimated Cost $ 23,900 A separate issue also to be considered is patching and overlay on Kiethson Drive. Public Works Supervisor Dan Winkel anticipates a cost of $7,500 to $10,000. This would dircctly affect the scope of the overlay and seal coat improvements. We recommend that a feasibility study be ordered at the December 28, 1992 Council meeting, for the 1993 Maintenance Improvements. This will allow for the nccessary public hearings prior to the 1993 construction season. . MlG:db .nrmo-OIO.dt~ DEC-1S-92 FRI 1'" : 1 1 MAIER STEWART &. ASSOC. P. "-,,,- . rIiIiI.;l rill/- CONSULTING ENGINEERS Maier Stewart & Associates Inc. Issue Re: Storm Water Runoff Utility 0 Preparing draft ordinance, utilizing information provided by City Attorncy Filla, for presentation at December 28 council meeting. Would anticipate that discussion at that meeting may necessitate additions to the ordinance. 0 City Planner Bergly is developing a complete list of property uses and area calculations. This information is necessary to accurately determine anticipated revcn\lcs. 0 It is our understanding that the anticipated quarter rates for the storm water utility are $4.95 per unit for single family residential homes and $49.50 per acre for commercial/industrial properties. These rates would generate approximately $151,000 per year. . . '959 SLOAN PLACE. SUITE 200. S'[ PAUL. MINNESOTA 551'7 612-774.6021 9600 SHEl.ARD PAR~AY. SUITE 102. MINNE'APOUS. MlNNt;SorA 55441 '81'.C;.V;.04:l2 . EMlllIIl nt"'!t"'!nrl!lnllv ~~l"':I..,'.In1" DEC-18-92 FRI 10:11 MAIER STEWART So ASSOC. P_03 . ISSUES RE: TH 511SNELLING A VENUE MEDIAN CLOSURE . Have met with MnDOT since last workshop. The four alternatives are: I. Intersection realignment and signalization 2. Frontage road from Old Snelling Avenue to Lydia 3. Widen County Road E bridge 4. Do nothinglkeep median closed . Intcrsection improvements would involve realigning Old Snelling and Hamline Avcnucs at a right angle with TH 51, signalization, possible wetland issue. . Frontage road alternative involves right-or-way acquisition, coordination with City of Roseville and Northwestern College, wetland mitigation. . . Estimates for both alternatives to be provided. . Appears that intersection improvement would be City's best option. . . . ~\.i "- .':::--.... -.... ~ \:') -.:::t I.{J , ' -;;--)-> ' -...... '<.. . "...-- ~- '4;' ~ r) .-, \..- \...~ "- ,I) \ =-- '--.., CO -"- f ~ ~ 0 '2 .:ji ~ C>'" 1~ ~ ' , c "'""' - ~l .~ ~ ~ Q) (3 en I 4" 0' .S:: 0 Q. v"":::>-,- _ · '" 'CO -0 --0 ~ d J ~ i' ~ c:,. <L { ~ W L ,b." ~ ........ ~ ~~ ~ [~CJ ~ ~ ,OJ w_, . '" w+ > y .< ~ +- ';1 .'!. ~ /'!'!M ~ ' , " L/ t,;l ,.;:: ; ': 0 I o,~ QJ no i- f C\, p- -+ "--.L I -==::: I z::::::- f~ i' iJ/!b /J:U C!(! "17~ ~ &.Il\w... · Q, ~ "fdijivJ~^":T 0~~ RECEIVED DEe 1 6 1992 . D':;2Ce~T.b ,:-::..('- L ::; ~ .Li:1"::;'~: (H'" .d '~'2 ["J !lil..L::; LJ T:,',;/ CDUl lei 1 c:: 1. t~ \/ ,-." (~l"'.j i:::':'f"": 1'-1 :i. I :i. ~:s U'," :ti}.S() l.\Jc:'~::; t.. ('.i i q h l,~1 ~~. 'y' (,!(;") l~H'"di:;':n Hi.ll 'C., I-vln c';;;:'; -I", "J ~.! L. .:. .'-> CC!i...lr'IC::ll t"i E' ffl b f:':' l~' !~, !; r ,- V,) ~: .::f. '::. I hC:~~;_r'" 1 ~3 't ]". .I...!.~':~' 'I thE:..+: c.11..l,f2 to tin'IE: ;, a.ck Q.t 1 (~t.tE:i'''S fo/.- I.T r"eop(~:ni.nq '-, ., -,. .:':~_n;j ~7:i 1 t:.he cc:uncl1. is consi d(-=-I~'i n9 ~1n€;!J. 1. 1. r1i:.4 p'=-1'..al.:.....r1E'nt C1D-:SUI"'f:? 0+ t.ht::: :~ nter~:.:;e:'c:ti on.. All the t i me:~ and eni::::'fU(Jie.'!s 5p;:~~n t:. re~5'::~'d.f"C:hi ng, pcs"t.itic.llinq, conducting opsn m(~et:i.n9s. t.D q~=t:. t:.hE~ i j'"'l tf~l'" SE.'C t i i:)l'1 r-eopi??ned appe.3.l'""S to have . been a m';:;?-,;':l.n 1. ngl (=s!:; 02 >~ ,~':~"l'"' cis E2 +01''' the Public Safety cammi tteE'.. Evt:?r"::/ t:.iCi'l'::':: I pC'.::i~S Lh2t:. L n t E?!'. 5(,:'':1.: t i on ~:\nd have tD qCJ CiU.t o.t my Ill-3.\/ t.O q{.:,:~t: h Chn.f'! a.nq~:'}l"-!E; m(.~~ " This un.ftjr.tunate l. O~Sl..S of 11.+e (' '~'~~:iu.l +:. j nq l~ r" Cli'i't th(-~ r" E' c: f:: J F.~ ~:;} ~; i:H?t"; .::~. \/ i CIi" .. onf..~ i nd i 'vi dU2d and UT t: ,;:;., i 1. !...I.(-,"' ':.~:. to h.::<,v(~,~ '.:;1, cC:i:Jt:'(:i!'-c'/c:L .'::~ u.r':d\"?r control h~,.s i nconveni e:"'lced in,~':1.r'i -'./ " Th:L ':", L;:pe:: o-f .,.. D'! a_ :::; c! n::. :--j q c:: Cll...t 1 d b(.:~' C{:".U'-l'n i ed t.o th'2 closing (J~' .;].1 L -f ]1J!;'H:''!!'u St"':C'iJ~:; dU.f! tD t:hc:~ r""3CIE.'nt de.:;;(ths 0+ t:~;JO 1::1 El'" ks.. lAJ(-;:,: rlf::':i:..,::.d t'_hi s :i. n -j.:, f:':' (" ~:~, Co' c 1:. i (] n r-'f;:-Dp.::;~'nt.,,!lj .:?,nd liqht.:s i n~;t.:,::.':r..ll Ed fOlro t,I"';D';::'C~' l,h..I\"1D <::6.i'lnDt ~::;.h(::)I.,..j i;:iODd judqf::?ment !"~Jhen ct'..o~;si. nq nn cc:minq t:.j'"-,::':(f'f:i. c" /) '''''.''''.~ J ~ " . ~. , I'J Ill,!i' i lJ] l! L'" /,,),.17/9..:1., . {!{!:~i fJwN.il.. JJ.~ J:;~ --------- ~ ~. - ~ ,\ . ~ . ':< ~. ~ llj ,~~~t~ .. ~.~ ~ L~'.'~ ~ ~.~~..~ ,~" ~ ~ ~ ~ ~ . ~ ~ ~ ~l't\: , .{ JJ JiJ t J ~ {1'- ~ J 'f ~ ~. J. ~ ' ~ {- ,f j ~ ~ : '~j ~ ~ ~ 1 \'J '\ ~ ~ - t .~ S>.. 1 J ~ ~ " 1 (U ~ l ~-t u ."" ~ J 't,. . ~ ~ ',1 ~ j ~ ~') ~ ~ V'S -1 ' ~'kJ · ') '1 f fv 1 1 ~ , ~ ~ ~ ~\ ~ ~ q ~ ~ ~~~ ~ ~ . RECEiVED DEC 1 7 1992 . :0 F~ c: F: i'i~ :E( F F: t ~~; " :1. '::p I.:? ~2 -rc) 1- '-.:fJF:::{\r\),_,r~: ","',1 !' ,~.~. ..,.j'...-,' f:'::} h~ :C' c: !'.! :'--1 L.!... '::~~ ;; :0 i:~ !'~'i h: 1"1 r:: ]"".'1 E'. r::: F~ :::. ~ V,l": I 1\1 CJ!..JF: i\iE:} F;!..!F:jUf ".c.; "jCi!.:i DF' (.~nDE::i\i H I L..L,~:;: r::-:':F'E: THE: V I c'r I I'llb OF THE: 'c. el .D::~1 I i'i;:-:, C)F' D I i::::i:::i' PiCC;t:::.3~3 TC) "")1,:::::,: He)!""-iE:::::::; FOP U",!EH Pi \(E('~F :U"-.:" THE:: H I C.; H i,\) (.\ 'y' ~_7.i:1. Ci....C:H I !\JCi FP[J!V! H('\l~'iL, I i')C 'rc'~ C}I....D E:.!-'J[L.l. I j\fFi PI'../E:!\it..lF:" PI:.;3 \'r:~;!,_~ I :i"'~CI/"..! -ri...! I ~::; L\lrt~3 DCi'-.-!E I I\! (:'11\ t..r!O,.: ~ I I'~ i< ("; B L F j\1 P'll\~ 1\: E:~ F=.: " "!'I"'iEj::~:E' ]"'l(';VE HE:::F::::-" j:~.:E~~CFI".-.!'T F:;:[~F'CF~'r;:~; r'i:CU\;T HE1~-:ED :::::::3 F~'F;:CiF;'DU[:D D\/ THE ])i" ::'i:::!F:'rj'"'ft:~~\j-r [JF T~~:{":!NF:;F'c:r T (:j 'f I C)l\i r::'C1F: nEJ'tIED I (~~ T:r C)~\l ~ ~~IF: HUF'E: 'THE: C:(::}LJ1.....!C Ii. Wli_l., VIG!:JROIJSL.Y EXPRESS INTEREST TO SOME VIABLE . SOL_l.JTI(JN TO T~~IS NEI(3f~BOF~~-fOIJD DI!_EMMA~ WE AI_.SO KNiJW ()F A ~~Ai\:DI[;AP PEF~f~(:}N L.IVING NEAR '-HE [N'T'ERs~~c-r:[ON A:~D BECAIJ;3E (JF T~1E: Ci_OSING :: T H('i:3 CD~::;T TH I ~::) F' E F_ ~::; U )') ("'j 1\1 ;:~~ / ") ,~-.. 'i :;'.11..; (JC.iL.,i .(:1:::;:~:; (i D(-\'-..( F='UF~ C(:.Ei F.(\F:;:~:" j....:::.-c~:: r :'.: :"'j I 1\!I:' I,:::::' !)C}i Ii ,.n. '._ .;:1.:.;.._ "i'C::' !::;El:::: fl'''l!::: C:i..Ji..J!'-.)CIL r('~!<E qC:TI(J!\i ""."..- ti"'-!"!,!,.~ '::..: i"l(:'j'r'TE: F: u '.._"n DC (::j)....: WE I:AN TO S[)!_VE 'r~,jIS -T':~AFFIC PF.:U:,'::-,'i :::::i'''-j" THf:::';!\l~::' \.'D!.! i:~'DI:~: F:;~EP)D I hiD 'fH I :~::;" ~:) I NC:::~.F:;[i.__ \/ \/I]i...}F_: i\ ~e~~i01 '~"l::.- ,;~' ... '-:ii.' ! i'.:::' 'r', I:::' :', ~ .',.>". '.'.';".,... ,.,..... {.\F:,:Di:::::'-.i :..i i. .l_.,:.:, J.:_:',;:~.,: J :i ..... .. . ~/I'7I.'7:L f){!C; l' ~~ ~~ . ~ RECEIVED Di::C 1 7 1992 . December 15, 1992 Mayor Tom Sather City of Arden Hills 1450 West Highway 96 Arden Hills, MN 55112 Arden Hills, MN 55112 Dear Mayor Sather: I am writing to express my support for the reopening of the Highway 5110ld Snelling/Hamline intersection. It seems clear that simply reopening the intersection as it currently exists is probably inappropriate given the overall accident record. I suspect it is also politically impossible. I do believe that one of the alternatives being explored by MN DOT offers an effective balance . of improving the safety of tile intersection while at the same time restoring a measure of the convenience and accessibility that our neighborhood lost when the current crossing was closed. The realignment of Hamline and Old Snelling to provide a more perpendicular crossing along with an appropriate four-way stoplight arrangement would restore the intersection to it former utility. In addition to improving the access to our neighborhood and reducing the traffic going west on County Rd. E, it would appear this proposal would offer benefits even the old intersection lacked. for example, it seems to me a properly designed four-way stoplight system could: 1) Temper the current high speed traffic coming off of Highway 694 onto Highway 51. 2) Provide for a left turn onto Highway 51 from Old Snelling. Again reducing the traffic load on County Road E. 3) Provide a left turn onto Highway 51 from Hamline. . 4Mh:;-- C(f'~:f'V ,~ 1.1- t :....;.. " l!1li.J It!.,{,{ ~ . ~/~) .J)/;: 'z.1,~;. J'J. c'-1 (}f..4.iL u '- J . Mayor Tom Sather . December 15, 1992 Page 2 I realize that you and the Council have limited powers in this situation but obviously your support would carry a lot of weight with MN DOT. Please give this option for reopening the intersection your serious consideration. Sincerely yours, ~J Richard W. Smith 1442 Bussard Court Arden Hills, MN 631-1106 DS:ah . . ------ ," , . CITY OF ARDEN HILIS MEH:RllNOOM TO: Mayor and City Council W FRQ(: Dorothy A. Person, City 1ldmini.strator MTE: Dee....her 18, 1992 stlBJECT: City Facilities - Review of ~ions In discussions with the City's Architect arrl Financial Planner, the following options are forwarded for your review at the December 21 worksession - these alternative costs are extremely preliminary arrl subject to some change. 'Ihe plan for the Public Works facility included sitework ($312,000) arrl the building costs ($1,773,000) for a total cost of $2,165.000. '!he referendum ($2,800,000) included borxling arrl legal costs in addition to some city Hall costs . Listed below are further options for design arrl building costs on the Public Works building. Further details will be discussed 12-21-92 with information from the Architect: . 1) Reduce the building, storage arrl maintenance areas by 10 percent for a total of approximately $2,074,000. 2) Reduce areas by decreasing =ld storage areas by 10 percent for a total of approximately $2,049,000. 3) Reduce area by 15 percent - this option would reduce future space needs for a total of approximately $2,031,000. 4) Use a metal building system (in lieu of precast =ncrete arrl masonry) but use same plan for buildings f= a total of approximately $1,802,000. 5) Use current site, with existing Public Works building used as =ld and miscellaneous storage with minor :improvements, build a Public Works addition next to the current building arrl salt/sand storage arrl site :improvements for a total of approximately $1,725,000, with an additional building for City Hall. 6) Use current site arrl building with :improvements, build sand/salt storage, =ld storage, conply with ADA arrl current codes for a total of approximately $730,000, with an additional building f= City Hall. . . CITY F1\CILITIES - REVIEW OF OPTIONS Page Two Possible Sitin:l Alternatives Public Works arD City Hall (Key issues are related below with each site issue) 1. TCAAP property - Preferred site Negative: - date uncertain for finalizin;J larD aCXJUisition - need to brin;J in utilities, road upgrade - site provides sufficient space Positive: - low or now cost 2. CUrrent site - 200 preference - a positive point is =ently City property arD can be used :immediately. - negative points are: . lack of income frCBll the sale of this property . question of best use of property . space questions whether this provides roam for lon:rer tenn needs - my salt/sand frCBll outside vendor resulting in no storage requirement * resultin;J in no need for storage Wildi.n;J. 3. Rourxi lake - 3rd preference . - a positive point is that the larD is =entlyavailable for purchase - However: . costs of larD ao:;{Uisition is additional to =ent b.tdget . infrastructure improvements needed - road, a=ess to 'IH 96, utilities, arD . accessibility arD visibility to public are limited * 'Ibis option can be pursued in any site plan. Public Facilities Financial OPtions 1- Pursue 200 referendum after 6 months frCBll November 3 (May, 1993) - Amount must be the same. * 2. Pursue a 200 referendum as soon as needed - the amount would be less than or above 5 percent of the $2,800,000 (range of less than $2,660,000 or over $2,940,000) after 45 days of notityin;J the County of the City's notification of callin;J for a referendum. * 3. Pursue a lease purchase option - this can be done as soon as necessary with bonds frCBll an HRA. * 4. Direct lease frCBll a lease company, Le. i Northwest National Bank. This is discouraged if costs are more than $1 million - issuance costs would be within levy limits if they return. The City owns the property. . 5. city may issue ce:rtificates of participation arD declare Council as a buildi.n;J authority thereby creatin;J an IDA. 'Ihis would be subject to - . any future levy limits. In addition to establishing a City Economic Development group, the bond issuance costs would be less costly. CITY FACILITIES - REVImi' OF OPTIONS Page Three 6. Build piecemeal per priority nee.:i: a) Build city hall or public works only with dollars on hand (approx $500,000) and borrow remainder - interest rates with lease back. b) utilize PIR funds internally to finance pieces of the cost. * A typical length of bond payment is 10, 15, or 20 years. Dl\P Its . . --------- ------- "" CITY OF ARDEN HILLS . MDUl1lNDtlM '1'0: Mayor and City Council FIlCH: Dorothy A. Person, City 1\dmini.strator f){ DATE : Dec'........... 18, 1992 SUBJECT: 1993 Omnittee l\ppOintments To date, the following is a list of =rent committee memberships. It is noted if they are interested in 1993 for reappointment. Also listed are others who have ~essed interest to date. DFSIRES '93 <XI!MITTEE CURREm' MEMBER MEJ!IlnlSHIP 1992 cmZEN' S ro1MITI'EE Tom Merickel, Chair YES YES Carl Blomberg YES YES Dan Christensen YES YES Arnie Delger YES YES Ray McGraw YES YES . Charlotte McNiesh YES YES Denny Probst YES YES Jeanne winiecki YES YES 1992 FINANCE ro1MITI'EE Sandra ShrewsbJry, Chair YES YES Joseph M. Corpstein YES YES Frances Holmes YES YES Charlotte McNiesh YES YES Chuck Mertensotto YES YES Carl Rundquist YES YES Ramanik Shah YES YES 'Ihomas steele YES YES 1992 HUMAN RIGHTS Barbara Younoszai, Chair YES ? * Shirley Chase YES ? * RayConroe YES ? Gordon Dean YES ? SUshila Shah YES ? Rosalie Hedlund NO NO * George larson NO NO* (Due to 1992 resignation of Rosalie Hedlund (term 1993-1995) and George Larson (remainder of term to 12-31-94), plus Younoszai and Chase terms are completed, . two 3-year vacancies exit). . . 1993 CCI!MITI'EE APPOINDO!:Nl'S . Page Two 1992 PARKS & RErnEATION cx:MITTI'EE David Sand, Clair YES YES Mary Gillies YES YES Bill Guelker YES YES Lynette Kreidler YES YES Mark labine YES YES Mark Literski YES YES Mark Magers YES YES Dan Messerly YES YES David Moberg YES YES Alan Montgomery YES YES Megan Ricke YES YES 1992 PlANNING CXlMMIssrON Dennis Probst, Chair YES YES Jeanne Winiecki, vice Chair YES YES David Carlson YES YES steve Erickson YES YES Raym::>nd McGraw YES YES Scott Petersen YES YES Barbara Piotrowski. YES YES . 1992 PUBLIC SAFElY / IDRKS cx:MITTI'EE Richard Roessler, Chair YES YES Arnold Delger YES YES Richard Fregeau YES YES Bill Gillies YES YES Leslie Goldsmith YES YES Jean Ianberg YES YES Leslie Reindl YES YES Herbert Tatley YES YES OIHER INTERESTED PARrIES: Marty E. Rye (Planning Ccmn.) NO YES I will let you know if there is further additional interest prior to the January organizational meet:in3'. nAP Its . ---------.-.- . CITY OF ARDEN HILlS mt:::m\NIXII( DME: """"-hoar 15, 1992 TO: Dorothy Person, City :tu'InI;n;<<trator FRCM: Catherine J. !ago, Zonillg .Mmini.strator stJBJEX:T : Request for o:nmcil Direction on Recreational Vehicle 1\mendments to Zonillg Code Listed below are the options for Council consideration, as discussed at the December 2 Planning Meeting. Planner Bergly and I neglected to request action at the 12/14/92 Council meetirg on this matter. At this tbne I am requestirg this matter be di"""'99ed at the Worksession meeting to be held on Monday, 12/21/92, so that Commission may schedule either an informal or Public Hearirg at their February 1993 regular meeting . ~l' OF 12/2/92 PLl\NNDIG MINtlTES: . 01ai.r Probst and commission requested direction from Council to proceed and offered the followirg options: l. Conduct an infonnal hearirg to discuss only the Recreational Vehicle amendments. Notice would be sent to residents expressirg interest by letter or phone. 2. Conduct an infonnal hearirg to discuss all Zoning Code amen:lrnents . 3. Conduct an official public hearirg to discuss the proposed Zoning Code amendments in lieu of infornal hearings. If Council prefers an official public hearirg should it be held at Plannina or Council meetina. 4. Commission also requested that Planner Bergly be auth=ized to prepare a diagram shawirg the area on which Recreational Vehicle parking would be allowed for residential properties. (Le. the brilding envelope as defined by setbacks on a typical resident lot). (8 1/2 xlI). CJI:rk . ~ ., ARDEN HILLS CITY COUNCIL WORKSESSION MEETING COUNCIL CHAMBERS MONDAY, DECEMBER 21, 1992, 4:30 P.M. 4:30 PM 1. CALL TO ORDERIROLL CALL. 2. AGENDA ADOPTION. 4:30 PM 3. REVIEW OF CITY'S PAVEMENT MANAGEMENT PROGRAM AND COUNTY CSA PLANS. 4:45 PM 4. CITY ENGINEER REPORT AND DISCUSSION OF STORM WATER UTILITY. 5:00 PM 5. CITY ENGINEER REPORT AND DISCUSSION OF T.H. 51 AND OLD . SNELLING AVENUE. 5:30 PM 6. DISCUSSION OF CITY HALL AND PUBLIC WORKS FACILITIES OPTIONS. 6:00 PM 7. REVIEW OF COMMITIEE APPOINTMENTS (CITIZENS) FOR 1993. 6:15 PM 8. DISCUSSION OF REPLACEMENT FOR COUNCILMEMBER JOANN GROWE. 6:30 PM 9. DISCUSSION OF RECREATIONAL VEHICLE AMENDMENTS TO ZONING CODE. 6:45 PM 8. COUNCIL COMMENTS. 7:00 PM 9. ADJOURN. ., The above times may be subject to discussion of the issue. z;eC-16-92 WED 13 :137 MAIER STEWART 80 ASSOC. P.12t2 . rI/,I~rIIII- CONSULTING ENGINEERS Maier Stewart & Associates Inc. MEMO TO: City Council for December 21, 1992 Work Session FROM: Mark Graham, Maier Stewart & Associates, Inc. DATE: December 16, 1992 RE: Possible 1993 Street Maintenance Improvements FILE NO: 520-040-10 All streets were re-rated by members of the Public Works Staff this fall. Information was input into the City's Pavement Management Computer Program and lists were generated for streets requiring seal coating, overlaying or reconstruction. The computer ratings and field commcnts were used to formulate these recommendations. In addition, performing the same type of maintenance on streets within the . same area generally allows lower bid prices, since the Contractor minimizes his traveltime. Following are lists that Public Works Supervisor Winkel and I developed based on the ratings, field comments and group location of streets. We have shown the ratings and estimated construction costs. For overlay improvements in residential areas, the City assessment policy allows for assessment of 50% of the total project cost to abutting homeowners. The assessment rate in 1991 waS $2.82 pcr front foot. We would anticipate a 1993 rate of $3.00 to $3.25. For seal coating improvements, it has been City policy to not assess abutting property owners. We would not recommend a change in 1993 to this policy. The budgcted amount for 1993 Street Maintenance Improvements is $110,000. PROPOSED 1.5" BITUMINOUS OVER LA Y IMPROVEMENTS ~ Erill!1 I2 Ratine Est. Cost Karth Uike Circle Hamline Avenue 2nd Cul-de.sac 59 $ 24,000 Nursery Hill u.ne Nursery Hill Ct. 400' North 73 $ 32,000 . Nursery HilI Court Nursery Hill u.ne Cul.de-sac 73 $ 19,000 Amble Road Hamline Avenue Dead End 43 $ 21,600 Briarknoll Circle Snelling Avenue Cui-dc-sac 23 $ 18,500 1959 SLOAN PLACE. SUITE 200. Sf. PAUL, MINNESOTA 55117 $12-774-6021 9000 SHELAFlO PAFlt<:-NAY. SUITE 102, MINNEAPOUS, MINNESOTA 55<<1 612.546.0432 . Equol CIoponunll)' Emp'OYor --------------- . DEC-16-92 WED 1:3 : 08 MAIER STEWART & ASSOC. P..03 . Briarknoll Drive Norma Avenue BriarknolI Cir. 35 $ 29,900 Norma Avenue Boarknoll Dr. 500' South 56 $ 9,800 Gale Circle W. Floral Dr. Cul-de-sac 44 $ 11,100 lamcs Circle W. Floral Dr. Cul-de-sac 48 $ 17,100 Dellwood Ave. Nursery Hill Ct. Amble Road 60 $ 14.OQQ Total $197,200 Less Anticipated Assessments $ 47.000 Estimated Cost $150,200 We anticipate that the bidding process would reduce these costs. We recommend bidding this group, and, if necessary, eliminating Nursery Hill Court, Nursery Hill Lane and DelIwood A venue to remain within the budget. By eliminating these streets, the estimated cost would be reduced to $99,000. It is far prefarable to plan and notify residents of a potential assessment, then delete the work, than it is to receive favorable bids and then add streets, which would require additional public hearings. . PROPOSED SEAL COAT IMPROVEMENTS SlrW Emm Th Ratin~ Est. Cost Rcd Fox Road Frontage Road Lexington Ave. 51 $ 10,800 Pine Tree Drive Harriet Avenue. Co. Road E 74 $ 4,800 Northwood Drive Red Fox Road Dead End 87 $ 2,900 Fcmwood Court Ingerson Road Cul-de-sac 86 $ 1,400 Ingcrson Court Ingerson Road Dead End 93 $ 1,500 Edgewater Avenue Lexington Ave. Dead End 97 ~ 2.:;00 Estimated Cost $ 23,900 A scparate issue also to be considered is patching and overlay on Kiethson Drive. Public Works Supervisor Dan Winkel anticipates a cost of $7,500 to $10,000. This would directly affect the scope of the overlay and seal coat improvements. We rccommend that a feasibility study be ordered at the December 28, 1992 Council meeting, for the 1993 Maintenance Improvcmcnts. This will allow for the necessary public hearings prior to the 1993 construction season. . MlG:db nk'1lKM)IO..kc: DEC-1S-'92 FRI 1'" : 1 1 MAIER STEWART & ASSOC.. P. 0 C . ri/,I~,,:,/- CONSULTlNG ENGINEERS Maier Stewart & Associates Inc, Issue Re: Storm Water Runoff Utility 0 Preparing draft ordinance, utilizing information provided by City Attorncy Filla, for presentation at December 28 council meeting. Would anticipate that discussion at that meeting may necessitate additions to the ordinance. 0 City Planner Bergly is developing a complete list of property uses and area calculations. This information is necessary to accurately determine anticipated revcnllcs. 0 It is our underslanding that the anlicipated quarter rates for the storm water utility are $4.95 per unit for single family residential homes and $49.50 per acre for commercial/industrial properties. These rates would generate approximately $151,000 . per year. . 1959 SLOAN PLACE. SUITE 200. ST. PAUL. MINNESOTA 5S'17 612.774-6021 9600 SHEr.ARO PAA~AY. SUITe: 102. MINNFAPlil.l~. MINNf;:SGrA 55441 R'''.~.d.~.nJ.~' . J:'nmd nnnnPlllnl", ~,.,..,"l"'in~ DEC-1S-92 FRI 1 121 : 1 1 MAIER STEWART &. ASSOC. P.12I3 . ISSUES RE: TH 511SNELLING AVENUE MEDIAN CLOSURE . Have met with MnDOT since last workshop. The fOllr alternatives are: 1. Intersection reali&nment and signalization 2. Frontage road from Old Snelling Avenue to Lydia 3. Widen County Road E bridge 4. Do nothinglkeep median closed . Intersection improvements would involve realigning Old Snelling and Ramline Avcnucs at a right angle with TH 51, signalization, possible wetland issue. . Frontage road alternative involves right-of.way acquisition, coordination with City of Roseville and Northwestern College, wetland mitigation. . . Estimates for both alternatives to be provided. . Appears that intersection improvement would be City's best option. . -- .- . I . r r , " ~ .~ ....... ~ ~ ~ ' - ' -.,..., I.{) ~ , , ' .;:;---) <. ' --...... - .~ ~ ~- -~ ~ ' ,. (.J C- ....... ' .') y, ?;\ "" , ~ ~ 00 ' -- - ~ C> do ' ----:r:> --:::-- st .s:: _ ~- '" -r, c '" < '" . ~ ~ - a ' ~l.s: l ':::::; oJ 0 en I' -:r 0 - r- 1.! v~:::> -.l- _ · ~ ;;: --0 --. -., d <l 1il ,_ -.0 ::; ~ ~{ ~ ~ L l~ ~ '- ---- '" ~ f ----'0 =-- ~ oJ LU.J ~ Q)~ ~ y - +-~ V) r- ~~. c3 ,- L/ t8 <:$ ~: 0 I ~ ~I /~ A .' , ,- ~ r- 1 " "', Q. ~ '--J.... f r _ '=' ,~ + ' '--, " .- -= ' c =, ., :J.: t:.,... ~ ~ , '::- - *0/'1:L . '1-1~ (f!o,JJliL u(' II :"l · ~ . , . ~ifi.-t"'ft Q.~ _u \..,.t~ RECEIVED DEe 1 6 1992 . [)';:.:::c: f:-'~~Tit:, ";,..- IIC;;' I C..)(~"., l. "..1 ~ (ir-c!i:.:?Cr Hi 11 ~5 c: i +:.\/ CC1L:fn ct i C::i. t.\' (J'!' i".j{"'C1i,,:.:i"i j---1:\. 1. 'l. ~:: :t 4;50 VJI::::S;... I...li (:.:J!mI1d2V I;) (~:1 (-~.! !'~ c:! c::.' rl Hi. 11 s" l"ln ~j~j1. 12 COLt!,""j c: i 1 f'.'!t'~\iniJ 1::-:'1--' ~5:; I -f v,)h,')!::. ". t-t':':':D.!'" :1. ~:5 tl'''Uf.':' '.I thE:o.t dU.E' to t:.hE~ 1 \:1.ck o-F 1 r:~ttE'('S for r"eCip(':~r:i. nq SnelJ.tnq ,:~.r-'Id ~.;j .L the i::CJu.nci 1 is consi del~' i. ng pel'''m.:":\nen"t:. ClO-:5Ul"'t.? Dj-- tt'"IF;: :L ntE't'-SE'Ct:i uti" All the ticne and en~r"(Jies Sp"f2nt r'e~se.','::'\I'-c:h:i. nq , pc;;)t.i tiQning., conducting open . mE.'E:t i n (;:j s;:. !:.<::) qe..i::. f:.ht~ i n"t.('?I"'SE..ct i on refJpened appe.3:.rs tD have been ii~, fTl(-?':':<.n i fial (2SS ei-:E:l"'ci 5;:;2 +or trH? Public Safet.y committee~ E\fc'~'r""'v' t. :l rn,~:: I p<':l.S:~ that:. :L r1t~'::.'!""SE'cti on and ha,vt~ t.o (.JC out o.t i'i":'y" ~^J.3.'/ t,e: (jE:t' t'\Dm.t~2' a,n(.;:)f.'::r-Sj m€':~ ~ This un-for'tufiate l(J"ss 0+ 1 i. .fe 1'00 (':-:~!...!.l '1::. i nfJ 1; r-'Ciifl UH:- r"!J..;c!:: 1 Q~::iS bet"i.3'.\/l. Dr' iJ':- one i ridi \/:l ,ju2!.1 .:ind f -=":'.1. J. U.fn~:.:.:! t.c h.:L1.V(~'~ <::1, mc:tcil"C:'y'C:: 1 ~,:'2 l...tndE)r cDntj....ol has i nconveni enc':2d m~~\n';/ " T'r::i s l:'./DIE: 0+ i'"" ,~::' .:oi ~:::. D r'[ :L n c,~ cc)ulc:! be c: a''"" r' i ed tc, the closing D+ <3,1 :L + 1. C:'~"[I::-:~ r" ~~ in) 0 f:J ~:~ duc-,~ t.D thE?: f'f;!CI:2:'nt. d!::;?:~tt-.[S 0+ t~'JO c:lerks~ V.) E.':':' nE'J~',~d t.i"(:I. 5 :i. i -f'.:. i.'::: r- :::, (':~. C t. i (J ["': I'''' i:? 0::: p E:-I"i t~ d .s.nd llqht;; i nsta.ll ec.i +or' 1::.hc!':::,(~ t^Jl"', C: i::6'1.i'liiD"i': ~:;;,h cn..; ';:jDCid j ud~Jemt:::n i: ~.Jhen cr""ossi nq on coming J::.I'"c':tffi c" '-;T" '. !JJ 'L "'.. ,," ''''..;:;c. l/.ii 11 .j ,':'I.ti"! , C:Ji :1. 'j 1 C:'';::1 . 1..l;':\7/r"" (!(!: 'I':!!8. i 6wt~ #& 'J~ . \. 1 ~ ~ ~ i . ] lJ (~~:b~ ~ ~ ~ ~' ~ .~ '" i ~ ~ ~ ~ ~. ] ,~ ' ." ~ 'J ~ ~ ~ ~ 1 'f t . \ { ~i liJ t ~ )~. ~ ~ ~ " \{. t ~ -l ~ J u; ~ }- 'b~ 1 ~ ~ to ~ . .1 . ~ ~ j. 5'i'~ J'f i ;) ~ - ~ '%' . ~ " ~ \ ~ ~ A . -lS ~ ~~ _ .........., C\. . · ~ . - i .~ .' ~ ~ ~ ") 1 $, ~ ~ L 1 ~ Q ~ ~ ~ ~~~ ~ ~\ ~ RECEIVED DEe 1 7 1992 . D i~:: C~ E i"'f F3 E F; J.~~:;~ 1992 i L; i .11'-, ""..': C C~CI: J>iC I!.... (.>i F...c:, C'f\! i...j ;.-.'" :0 ::::. r I h: :'"1 F:: \.....1 E-:! : r;.: :::: ~ '.1'-'" I hi UL..!F::.: hiE::1 ";f'j):jU!" fCjCi:P ()!::~ (i: ..:DE:j"'",! H I L.L.~::i {.~~F;E:: Tr"tt::: 'v' I [;T I t"1!3 DF T 1-.1 E: \i\Ei:~. eL.l:)::::; (i, ::J;- DIF~E::[:'r ACCESS TO O:;r" ~iOM~~5 f~O!~ OVER A YEAR n'~ l'I~:~ H I C;!"'iVJ(~'i\/ ~,~.i:1. Cl_[lSJ:NG FF~O~I ~iAMl_Ii~E TO OLD SNEi..l..ING AVENUE. ;:.~F:. "j/C)!..! l<r\~()i,.lJ -r:...;.r. ::::; L\J{::'i~::: UCJi\rE:: I i"'-.I (.!;\~ i ii' .! Jl\li<:(\I:)L.E: lVlf::l1-.!I\iE:i::;" "ri'.-l[.i::;:i:::: H(.::")E~ E~E::i~::\! :::;-'r:~C:E::i')'r HE:~::'UF:T~:3 t\.r:':C:iLJ"l" F:!:::j"ii::.D:" :::::,:::. F'F;;[)PCli:;E:D E\\I TI~E I):~:'01~TMEN-r OF~ TRANSFr':~l-A-r:[ON FOR REMED:rATIIJN. WE HUE'iF . 'rHI~~ CC}i...JhiC. ,:: i. lAJ I L.t... V'[GOROI.JSt_y EXPRESS IN1-EREs'r TO SOME VIABLE SOi_l"iTIO!~ T(J 'T}~:[S NEJ:SHBORHOOD Dll".E~IMA~ i.A1E~= {;L~~~f::} i.: i\.!Cii;'.,! UFo {~~ ~-i;" ".~:c):r.L(:'IF F'E:F:~:::;C'i!\~ L..I\)Ii\.!F" !\.!E:P!F: THE I NT[F':3F , '-,!'I ,-',; "~_I ;~:EI_"'1r}:-,F IJF T~iE: CL,IJ!3INR.:T HAS cos-r THIS r.:; F F~ ;::; CJ i\! (.\ (.,! ;::~ :/ 'T' F; (.. ! ',-\!\J("!, ',! l '~':iF.:::::: (:', :D(~;\'" F'C)F: C(~i,;'::': !:::'. ",::;E~" I.... ::::- i~~ c::' ri"", !Yj I !')L: I'::::: ;,'.;;'"'):1: -,-", . "0 SEE: THE~ (:OIJN!:Ii__ TAKE AC'flOM "',...,'--. "..""'.., m t:hJ T!''':I:~:; (;/-\TTE i": " :OU (.~'!L.,: WE CAN Tn S:~L.'jE TH:[S 'TRAFFIC F'F:U ..~i,_ ::::>"1" THj::,!\II< '{(Jl} FDF: F:t:~('I:UII\iF') Tt-j'j C ~:;.f. i\IL::: H::~'! . "/Cii...1i':::C: i\ ~'f"7~i01 ',:"_.' ',,}.,C:, '.'.'!; i(ji:~:'i' ;'.: '::,,'C\ ,'.; ,.,,'.... ('-;F~DE~:i'-j !1 ,m.. ""'j"" :', ...!....!.i.; .. . ~!/,.,I.~:L {)r!C; . l' &nu-~ J~_~. " . RECEiVED Di:C 1 7 1992 . December 15, 1992 Mayor Tom Sather City of Arden Hills 1450 West Highway 96 Arden Hills, MN 55112 Arden Hills, MN 55112 Dear Mayor Sather: I am writing to express my support for the reopening of the Highway 51101d Snelling/Hamline intersection. It seems clear that simply reopening the intersection as it currently exists is probably inappropriate given the overall accident record. I suspect it is also politically impossible. . I do believe that one of the alternatives being explored by MN DOT offers an effective balance of improving the safety of the intersection while at the same time restoring a measure of the convenience and accessibility that our neighborhood lost when the current crossing was closed. The realignment of Hamline and Old Snelling to provide a more perpendicular crossing along with an appropriate four-way stoplight arrangement would restore the intersection to it former utility . In addition to improving the access to our neighborhood and reducing the traffic going west on County Rd. E, it would appear this proposal would offer benefits even the old intersection lacked. for example, it seems to me a properly designed four-way stoplight system could: 1) Temper the current high speed traffic coming off of Highway 694 onto Highway 51. 2) Provide for a left turn onto Highway 51 from Old Snelling. Again reducing the traffic load on County Road E. 3) Provide a left turn onto Highway 51 from Hamline. . 4/t/-/ h:;-- (i (1.'-f).._JJ;j ,...V (L," c..!1-'u ',1, i ~~ - ~. ,~ ; , .... ,'- ! J-. I~ . ~. dJ .J) L "" ).;":;'A;] f}w.u.u, . Mayor Tom Sather December 15, 1992 Page 2 I realize that you and the Council have limited powers in this situation but obviously your support would carry a lot of weight with MN DOT. Please give this option for reopening the intersection your serious consideration. Sincerely yours, {2J,J Richard W. Smith 1442 Bussard Court Arden Hills, MN 631-1106 DS:ah . . . CITY OF ARDEN HILLS MEH:'IlANOOM TO: Mayor and city council f?P FRCM: Dorothy A. Person, City Mministrator morE: ""'-nhon" 18, 1992 SUBJECT: city Facilities - Review of q)tions In discussions with the City's Architect and Financial Planner, the following options are forwarded for your review at the December 21 worksession - these alternative costs are extremely preliminary and subject to some change. The plan for the Public Works facility included sitework ($312,000) and the building costs ($1,773,000) for a total cost of $2,165.000. TIle referen::lum ($2,800,000) included borrling and legal costs in addition to some city Hall costs . Listed below are further options for design and I::uilding costs on the Public Works building. F\.1rther details will be discussed 12-21-92 with infonnation fram the Architect: . 1) Reduce the building, storage and maintenance areas by 10 percent f= a total of approximately $2,074,000. 2) Reduce areas by decreasing cold storage areas by 10 percent f= a total of approximately $2,049,000. 3) Reduce area by 15 percent - this option would reduce future space needs for a total of approximately $2,031,000. 4) Use a metal building system (in lieu of precast concrete and masonry) wt use same plan for I::uildings for a total of approxilnately $1,802,000. 5) Use =ent site, with existing Public Works I::uilding used as cold and miscellaneous storage with minor improvements, build a Public Works addition next to the current I::uilding and salt/sand storage and site improvements for a total of approxilnately $1,725,000, with an additional wilding for city Hall. 6) Use =ent site and wilding with improvements, I::uild sa'nd/salt storage, cold storage, carnply with MJA and current codes for a total of approxilnately $730,000, with an additional I::uilding for City Hall. . . . CITY F1\CILITIES - REVIEW OF OPl'ICINS Page TWo Possible Sitina Alternatives Public Works am City Hall (Key issues are related below with each site issue) 1- TCAl\P property - Preferred site Negative: - date uncertain for finalizing lam acquisition - need to bring in utilities, road upgrade - site provides sufficient space Positive: - low or roil cost 2. CUrrent site - 200 preference - a positive point is a=ently City property am can be used immediately. - negative points are: . lack of income from the sale of this property . question of best use of property . space questions whether this provides roam for longer tenn needs - buy salt/sand from outside vend= resulting in no storage requirement * resulting in no need f= storage J::uilding. 3. Round lake - 3rd preference . - a positive point is that the lam is a=ently available f= purchase - However: . costs of lam acquisition is additional to a=ent J:u:lget . infrastructure improvements needed - road, access to 'IH 96, utilities, am . accessibility am visibility to public are limited * This option can be pursued in any site plan. Public Facilities Financial Options 1- Pursue 200 referendum after 6 months from November 3 (May, 1993) - Amount lllUSt be the same. * 2. Pursue a 200 referendutn as soon as needed - the amount would be less than = above 5 percent of the $2,800,000 (range of less than $2,660,000 or over $2,940,000) after 45 days of notifying the County of the City's notification of calling for a referendutn. * 3. Pursue a lease purchase option - this can be done as soon as necessary with bonds from an HRA. * 4. Direct lease from a lease corrpany, i. e.; Northwest National Bank. This is discouraged if costs are more than $1 million - issuance costs would be within levy limits if they return. ~e city = the property. . 5. city may issue certificates of participation am declare Council as a J:::uilding authority thereby creating an IDA. ~is would be subject to ---- . any future levy limits. In addition to establishing a City Economic Development group; the born issuance costs would be less costly. CITY F1ICILITIES - REVIDr OF OPTICIlS Page Three 6. Build piecemeal per priority need: a) Build city hall or p.lblic works only with dollars on harxi (approx $500,000) an:i borrow remainder - interest rates with lease back. b) utilize PIR funds internally to finance pieces of the cost. * A typical length of bond payment is 10, 15, or 20 years. nAP Its . . . CITY OF 1lRDEN KILLS MEH:IU\NOOM TO: city Hall and Public works Facility citizen CCIIIDi.ttee :FIlm: _"_'city~_~ DATE: Dee"'-.r 3, 1992 I SUBJEC'l': Dee.......... 21 Meet.inq As you are aware, the Public Works Referen:ium for a Public Works facility faile:i by a slim margin in the November 3 Election. The Mayor and City Council invite you to attend their Worksession meeting on December 21, 1992, at 5:30 p.m. in the Council Clambers to review options of City facilities. Enclosed are copies of letters for your information and update. Next week, a listing of various options will also be forwarded to you. If you have any questions, please feel free to call me. We hope to see you on December 21. OAF Its . Attachments . ;) 118 /~-L.... C (l. I~Q;:'L! 1 a,,~ iL(lU f,;Yp tinl ':/ j;;- , CITY OF ARDEN HILLS v-;-+...- . j 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 November 20, 1992 Mr. Roger D. Moberg 1308 Cannon Avenue Arden Hills, MN 55112 Dear Mr. Moberg: 'Ihe City Council of Arden Hills received your letter of November 6, 1992. We appreciate your interest in the best am most affordable service for Arden Hills residents. '!his, we agree, also applies to the referendum question on the furxl.i.ng mechanism f= a Public Works facility . Following the refererxfum, we have returned to the evaluation point. 'Ihis includes reactivating the Citizen's Committee am looking at needs am costs. The citizens' representatives an:l City officials review will be looking at options am potential cltanJes. Please feel free to attend . Please contact the City Hall f= =re information. I will also . bring your letter to the attention of the Citizen's Committee. If you have any further questions, please contact me at 633-5676. Sincerely, .- ? ~~<'~ h~/---- Dorothy A. Per : city Adrninistra or DAP Its , . PHONE: 16121 633-5676 . FAX 16121 633-7839 RECEIVED NOV 9 1992 c c ! t! 0<< ,<<' ,I"- ft<d'" .~ D, P,..,., (,5 r '130E: Ca.nnc1n ,.:i,venue - u),' I!' . ~, ,,:;~t.J~, - ,1-.'z:.!i'II$d>;-. ,b,n)~n ~il!~., rvlt.) 5S"1-j 2 11-6-92 Ma~'or an(l Council rvlernt.ers ~ftLjL--;; Village of .-".rden Hills 1450 \/V'est Hioi':v','av 96 'J' _, Arden Hills, MH 551'12 Dear Ma';.'or a.nd CounGiI: Subj.: Public \Nort:s facility Following the defeat of the proposed public 'vVork fiJ.cili~1 proposal in the recent election I 'h-:;>Ijld like b:- pass on some thou~.;lh~3 regarding tile failure c,fthis propc'saI3.s "Nell as offer a possiblB- aiterna.tivB- for youto con:o:der. First, let me tell ~/ou my famil~1 and I have nothing t'utthe highest of praise fQr;3.11 ofJ'ou who are "villin9 to seN;;';> our .t'i1la.g;;,;> -- mayor, council.. 8,ppointed officials, and full time staff, Having lived in the village for thirt;~-four ,'ears and no"/\'"eeing ourson and his ram i1y move in ~) the cornrnu ni!:'1' makes me a II the rnore apprec iatiw, of past and present Yillage government. . I 'toted againstth(; much nE>",ded proposal :3.nd",ncouraged my famil~1 to do the samE> onl~' because I feel most slrongly that tlie $2.8 million was absolutely outof sight as a put,lie: ',vorks fae:i!it;l. I am e:onyinced 'I',"€' are getting 'r'!<l.nts and needs mixed up. It se(;ms the cost comparisons people make are in relation to c,therslructures built by m u nicipa Iities :3.nd other gO'l€-rnme nt a9" ncies. In one of the !')c0l.1 papers I sa'.(.( 01. dro:Ning of the proposed building. For the space you are 'f!<l.nting to buy tha.t is too much money! 'vV",: ne",:d a. buildin9 and we probabl~t need it worse th3, nan,' other body in the State. I agree. However, therE> are altE>mati'-ie~: a, nd we sMUk] not look to oU-,,,,r tnunicipa.litie'3 ~~, see hoy'" trt"')' hOl.'.'e '1'I:3.3te,] mone,'. Having been on trlE> Planning Commission and Board of .-".ppeals some years Ci.90 and h3,ving <;Jone thmugh an a.pprenticE>ship in the building trad€'s even more y"'c,rS ago I do have a bit 01' an undersC3,nding of,~onslruction and C'Y3ts. \tV", h;3."ie to geta:',,'/:3.;/ from the squai'e foot:l.ge cc.st 9uidelines a~; 9iven l;.y some of ,)ur arc h it".Gt and big buiider friend~;. Let us tak-2 ;3. look ;3.t "Nri;3.t, for e:.:;3.mple, a truckinq (<xnpany migt'it put in for th~ir VBrj9:dequ:3.tB shop~; :3.nd ~;tOr.~.9~. I am quite fiJ.miliar viith modern pole buil(lino;::s and I'd like to SU9'~;est ;/ou consider what tt-,ey could be to the villa,;l'? First, regan:iing pole buildings, rniqht I sU99est ;!OU dror, :3.n'~ bi;:;.s 'r'OU mav Ii;;,ve and look oo.,.n rnindedl~' at tho;> fine, u,sab!p strUcturo;>s . } ..' I . availat,le to(!a~'. Of cours;;.. on.,. oftt',ese '~oul(! :)e '~ornl')ine(l witt-, a t.!od:: or "te.,.1 . structur€' as dE-~3 irEKL A noka Co u nC;l ,~, Iq)()tt f4taS dB-Ve k~f~B-d itB &;3.:~t ~:; j(!t& In thB- j;3St couple .:.f ~lear~; and tlier." 8rs- sorn.;; be8.utif'JI !arge slnKtur.;;s there that migt'lt 9i'-,'e ,..., ~ / ('--/~ , 1-- - ~ -" _/...."-'.(-'.'/ " i_ ". ~ /I/>,C'i<i.~ ,--:...-) c:;- <:'~~l"'- . >,- . CITY OF ARDEN HILLS 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 December 3, 1992 Mr. Paul Straumann 4380 Arden View Court Arden Hills, MN 55112 Dear Mr:. Straumann: '!he City Council of Arden Hills received your letter of November 18, 1992. We appreciate your interest in the best and most affordable service for Arden Hills residents. 'lhis, we agree, also applies to the referen::lum question on the fundi.n;J mechanism for a Public Works facility . FollOW'ing the referen::ium, we have returned to the evaluation point. '!his includes reactivating the citizen's Committee and looking at needs and costs. '!he citizens' representatives and city officials review will be looking at options and potential chanJes. Please feel free to atten:l. . Please contact the City Hall for more information. I will also . bring your letter to the attention of the citizen's Committee. If you have arr:I further questions, please contact me at 633-5676. Sincerely, ~c?/~ Dorothy A. Per city Administrator OAF Its . PHONE: 16121 633.5676 . FAX 16121 633-7839 RECElYEO NDV 2 0 1992 . Paul Straumann 4380 Arden View ct Arden Hills, MN 5511 November 18, 1992 city of Arden Hills c/o Mayor Tom Sather 1450 West Highway 96 Arden Hills, MN 55112 . Dear Mayor Sather: I am writing this letter to express my opinion on the recreation sites near the new city hall. I think it would be a great idea to build recreational areas around the new building, as long as we make sure we don't take up too much of the wetlands. I am aware that a rare species of turtle lives near Sunfish Lake. It would be a tragedy if their habitat was destroyed. I appreciate your previous precautions . taken for the turtles during the construction of the ne~ Army Reserve Training Center. It would be nice to have an ecology area near the city hall. There could be a tour through the wetlands for public use. It could also be used for an educational tool for science classes studying the environment. Thank you in advance for your consideration in this matter of protecting our unique turtles. Sincerely Yours, ~J~~ Paul Straumann ) "/ ~ Ii"" . /:-...,-~) ~ 0,'. '--r;U-,., i'<~ aiert (iA /1 . ,'jJy C.,UU!J.( CITY OF ARDEN HILLS . 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 December 3, 1992 Mr. Todd Rannow 1875 Noble Road Arden Hills, MN 55112 Dear Mr. Rannow: The city Council of Arden Hills received your letter of November 11, 1992. We appreciate your interest in the best and most affordable service for Arden Hills residents. 'Ihis, we agree, also applies to the referendum question on the furxling mechanism for a Public Works facility. Following the refererXlum, we have returned to the evaluation point. '!his includes reactivating the citizen's Canmittee and looking at needs and costs. The citizens' representatives and City officials review will be looking at options and potential chan;Jes. Please feel free to attend. Please =ntact the City Hall for mre information. I will also bring your letter to the attention of the Citizen's Cammittee. . If you have any further questions, please contact me at 633-5676. Sincerely, ~c:P~ Dorothy A. Per . city Administrator OAF Its . PHONE: 16121 633-5676 . FAX [6121 633-7839 -----.- -- --- )Vove;.rbe, I/' /crI:2. ~ ,1A !IJI RECEiVED ;,!~V 1 3 1992 . . ,"II', v/,^YCTT, Ilve rece/ved I~e lht;'ressiol'1. toJYt SiZvero../ l1elAJsrt>er re?=,r-/-s I-h..j jCi"'- J",,,, 'f kAOW l.A.>J,y lite ~4,z:e/15 of 4deA MIls v~l-ej T';'s/.-. t4e I'~kc.. work bwlc/;y bod relereA.JUIYl. .I ur;r \/0%-<.. , ~ the CO/..U1C'-/' 10 do a..! I VOl-(,. c:vl to t;J I . ,. <>",,1- vvh.v. Yo...... ,.-u..<sJdo ih;s ifyC7l--<- w;s-h 1-0 be:>f serve jCJ1A,.r ,Peo,P/e. 7he. newsrrer~ ']uokJ (01.(. as ~i.'-~J Jues~es .::t.S' 10 why Me refer- erzd"VYl VJas voQ dow/l., OJ1.j /),eY[ I~j;cp..td ;..J...a../. (OK. and fJze Ci:>lA/'Ici/ l',zfend k Md.e.. .?~$ f;,r Me ~~re) wJlIcA '-Vi/I 5"Y'?Osedly be ~sed 0'1 lIzese. ,JwL.$5e5, AyaJi-t}.I ur:le YCRA. -k '1Gt .s/- fl1..J..e ,j<-<.esses, "bJ 10 /:;'J ~ .J:..6-r voJer5 wlu. vokd ~X'ls/- Me rekn!?AcL.1"\) wh.y. 1"11 heir IOtA. .leI- 5krJeJ by k/hj yc.~ why I voId ~CU~5J- lite re!ere,.,}f.VI.1.. 11ve v'5r!-d lhe. C/-y Ii-!/ sever.:J .J7Mes &:VIe! [Ive see/l .fhe jub/,c /A.X>rJc.s ~-/;ke5, w.u.'re njM vvh&1 YC/lA.. sa..j, "/~/-5 "'- J1.o-brcu/'er. ,I tJe )0 need &;.:. l'1el-oJ cl-y 14..// CVl.d c.<.>e' do l1eed ~ new /~/'-c worJs .bw!cl-:!J. 54 I l/okd ;jWnsJ- 1 . ._ i~~~ (! C'.. L . H:A.~IJ.-',l_-r- \..1). ~oru - -------- lite. le.ferendum beCCU<5e. I waSr7 If C<m ,/t~ced 1-hC<.) we c.oJJ jl.AShfy 5jenj,~ itA,<gY #'/'-;/;"o/). 'okce I/za..I .1 did/! 'f scy lAd a.. iIj..~ m'-/ho;J pu6/:c t-VorJs ~/;)j G:>..J) nd- be )t.<.Sfr!ied} bw./- 'lh~J .f w,;;Sn t) G.YZvi/1ced ,J.k.) ;f c:o-Jj be. j'-<$kkeJ. ) Olkr vo/-ers JlJ.l /ve 'Sf'okn 1-0 hJ Me SC<Hle CL>YLC.er/l.. Mw it' wc,Jj be a. shCV>'te. ilf(/l..(. evrd the C~VJ1C.1 / wo.Jd M..J.e.?ku..s k- Me /...&re based <:.>/1. Ih!- a..S-S'A/OY'/.;OYJ .fk-~ V<$ rrfu. ?;~ fu.ehrer ,'11 hi5 cv-lc./e '-/1 -;the 15M/leI;., :5<::u-d} "Ardm Ii/Is voter:; Nov. 3 dee,;c!ed ~/ /-he cil-( jj;1lj Ita.d ""- ne.u f'..Jl/c ~1s .,G,JIy... .1 .II and the vofers I ~e vv;M1 del nol- dec.;Je t) Me c./ Jy d;dn'/- need a. new ~/:c wcsr1s c; Ii ty" - we deciled I-Jd. /he d/.y dij" /- t1eed -Ik5 #X~ n-r;IIi:n1 t..C/lly. 1 do" If w-vt) fllls /erkr 10 Yoz41d J1eJoJ-;ve . I believe lhC<.f /0<-<' a/l) JAe COl-ifIci/ CU'e doJ'j ""'- jood jDb cvzJ.I. ?W'1 c.OY1f(det1J- Ita./- yo..... WI!/ do wk.-I IS f'(fhJ- 1-.., ik.s S;.j.""A-ft'oY(. f..c,_J\''-o V--' f~JJ ~ -fjJ .pe P." 2 1 s- J;;- [+.' //5 j. \ il-r . THRESHER SQUARE ..~ DAVID I BE~'\n 700 THIRD STREET $0UTJ-I MARK G S\\'E.'\SO~ MINI\'EArOUS. MI\' ~;'::I' DENNJS :SUL'FF PHONE 161~1 ")7(1-(17lli) ii.1i DAV!DL';JR-\I;':"\l FAX 16121370-1378 PETER E ::";,Y5 DONALD W RJNGROSE . B . R . W . A R C H I T E C T S . I N C. MEMORANDUM DATE: November 16, 1992 TO: Thomas Sather Thomas Mahowald Joann Growe Dale Hicks Paul Malone Dorothy Person Dan Winkel John Buckley Denny Probst FROM: Jeff Oertel . RE: Arden Hills Maintenance Facility 1568.201 Estimated Cost Breakdown The following is an estimated breakdown of costs for the public works facility including the heated storage/maintenance and offices building, site work, gas islands/storage and cold/salt storage building. These costs do not include tools, furniture or equipment other than lube systems, crane!1ift systems, electrical systems and mechanical systems. Since the plans at this time are very schematic, a highly detailed breakdown of building components would not be very accurate. SITE WORK 1. Earthwork $ 140,000 2. Bins, fencing 40,000 3. Utilities 45,000 4. Paving, curbs 110,000 5. Site lights 12,000 6. Gas islands/pumps 25,000 7. Landscane, dirt 20,000 l/ -je_ ~-2-. ~ . Subtotal $ 392,000 CC.'V~Uf f' St~:1;i~)' M'. AFf--ILlAll. Of- THL llENNETT RI:\GROSE WOLSFELD IARVIS GARDNER I\le. GROUP ~u-;-a. tiRCHITf'.cnmF_ IJI\I~AN DESIC~ PLt\!\NI'..;G TRANSPORTATION ENGt\;[ERING M1NNLM'OLlS. DE\IVER. PHOENIX. TUCSON. ST PETERSBURG Public Works Building Committee . November 16, 1992 Page 2 BUILDINGS 1. Heated building shell $ 858,000 2. Benches, signs, etc. 15,000 3. Cranes, lifts 40,000 4. Mechanical 390,000 5. Fire suppression 20,000 6. Electrical 200 ,000 7. Salt/Cold storage building 250,000 8. Bond. permit. etc. 50,000 Subtotal $1,773,000 TOTAL COST $2,165,000 . For comparison purposes, review the following three projects for scope of work and costs: I. Woodbury Public Works . 43,000 square foot new building . All new site work and components . Minor repair of existing building and site . $3,123,000 total hard construction cost (8% +/- dedicated to existing site) . Cost per square foot new building and site only = $67/SF +/- (all heated building areas only, with a full range of site amenities). II. Plymouth Maintenance Facility . 74,000 square foot new and remodeled facility . Remodeled area approximately 8 percent . $3,680.000 total hard construction cost . Cost per square foot of total building and site = $50/SF . Work includes heated building, 6,100 square feet of attached cold storage and a full range of site amenities). . Public Works Building Committee . November 16, 1992 Page 3 m. Eagan Maintenance Expansion . 5,600 square feet of new construction, 1,200 square feet of remodeled area and 4,600 square feet of separate cold/salt storage . Site work is limited to new parking, walkways, some lighting, oil tank replacement and a few other minor items . $600,000 for new building and renovation . $120,000 for cold storage . Cost per square foot for heated building/site work = $88/SF . Cost per square foot for cold/salt storage/site work = $26/SF IV. Proposed Arden Hills Public Works . 29,000 square feet of heated building . Full array of new site components . 11,000 square feet of cold/salt storage . $66/SF for building and site work . . $23/SF for cold/salt storage . $54/SF average cost per square foot . Reminder: Costs per square foot increase as total area decreases or is relatively small. , J'L0{2h ,Ul780 . '~LL CITY OF ARDEN HILLS . 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 N~ 16, 1992 Mr. Dan lappin, Chief General law/Congressional Affairs Division Office of Counsel Department of the Army Headquarters U.S. Army Armament, MUnitions, and O1ernical Conunand R=k Islam, IL 61209 Dear Mr. Lappin: As you are aware, the city of Arden Hills asked for a citizen vote on issuing general obligation borrls for construction of a Public Works/Parks facility. Unfortunately, this refererrlum failed by a very slim margin. One issue believed to be a factor is the uncertainty of the site location. nus issue is inp:>rtant to Arden Hills voters to be able to move ahead in maki.rJJ their decision in this project. 'lhe city Council continues to recognize the continued need for Public Works and " city Hall bJ.il~. nus need is conti.nuin;J to be ackh:essed by a citizen's Committee and the City. . '!he primary site location for these two bJildings continles to be on the previously identified 'ICAAP property. nus land is adjacent to a similar use (the Reserve Center) and adjacent to a state Highway proviciinq access by the public at an optimum. We appreciate you time in this review. Please advise the City of any infornation you need. ::;t'tirL 'IhornasR.Sather Mayor Dl\P Its co: Senator Paul Wellstone Senator David Durenberger Representative Bruce Vento Theodore Schulte, Comman::ling Officer's Rep. . C7 1 'I;, 4:' C . vljt'-J '.&1... ~ -I lll)j- a PHONE: (6121 633-5676 . FAX 16121 633-7839 /;' -j g,.<--}? CITY OF ARDEN HILLS . 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 November 16, 1992 Mr. Rod Sando, Commissioner Minnesota Deparbnent of Natural Resources 500 lafayette Road st. Paul,MN 55155-4037 SUBJECr : Transfer of Twin cities Army Amnamition Plant (TCMP) Dear Commissioner Sando: 'Ihe city has received a copy of your October 29, 1992, letter regardin:J potential use of TCAAP property in Arden Hills. I welcome an opportunity to meet with you to clarify the City's needs for use of this land. I have left several telephone messages asking for a return call, but have not yet received. one. lis you kncM, TCMP property is located entirely within the city of Arden Hills. lis such, b:lth TCMP and its caretakers (private or public) have worked closely with the City through the years to address its issues. . 'Ihe space needs for the City buildings are lilnited, and are adjacent to current development in the Reserve site area and the current TCMP building area. Due to this si1nilar use and li1nited space needed, we believe this land use need is a unique situation and the years of processing is not required. '!his past SUIl1lIer, City and 'ICAAP representatives met to review space needs. During this meeting, additional space was identified north of the building site. However, the City dces not anticipate active use of this area. 'Ihe land is on open space with wetlands in the majority of the area. 'Ihe natural resource concern you express does not apply to this land area. We believe this use to be the best use. Again, I welcome the opportunity to clarify these issues. Please call City Hall at 633-5676. ;CYIii--- 'Ihomas R. Sather, Mayor OAF Its =: Governor Arne Carlson Senator Paul Wellstone Senator David Durenberger Representative Bruce Vento . Lt. Colonel Joseph Daves, 'ICAAP 'Iheodore Schulte, Command.i.n:J Officer's Rep. David Leuthe, Acting Regional Adm., DNR. Reg. VI Michele Beeman, Office of the Attorney General PHONE: 16121 633-5676 . FAX 16121 633-7839 ~{)L- (rfltel'lJ -/-8~) . CITY OF ARDEN HILLS 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 october 21, 1992 Mr. Dan Lappin Chief, General Law/Congressional Affairs Division Office of Counsel Department of the Arn1y Headquarters U.S. Army Annament, Munitions, and Chemical Command Rock Island, IL 61209 Dear Mr. Lappin: As you are aware, the city of Arden Hills has expressed interest in the TCAAP property on the east side of SUnfish lake and just north of the new Reserve Center site for its new City Hall and Public Works/Parks facility . Enclosed are copies of previous =espondence in which the city has ffiqlressed this interest. In the November 3 General Election, the citizens of Arden Hills will . vote on whether they wish to bo=ow on a general obligation bond of $2.8 million for the construction of a Public Works/Parks facility. '!he city will be financing the construction of the City Hall through other fund sources . I will update you following the November 3 General Election on the =ent status of the construction. Thank you for your time. Also enclosed is a copy of infornational items that have gone to the public. If you have any questions, please contact me at (612) 633-5676. Sincerely, ~~ City Admihistrator DAP Its Enclosures . II:ILln~II::. '~"''"':I' III:!~'" e~...f'!o ~ -="v .~.....',.." ,.......... _........."'" CITY OF ARDEN HILLS 1450 WEST HIGHWAY 96 . ARDEN HILLS, MN 55112-5794 July 22, 1992 Theodore E. Schulte Conunander's Representative Twin Cities Army Ammunition Plant New Brighton, MN 55112 RE: Arden Hills City Hall/Public Works/Parks Facility Dear Mr. Schulte: Thank you for arranging the meeting this past Thursday with Lieutenant Colonel Daves, Mike Fix and yourself with Council Member Mahowald, Dennis Probst and myself to discuss the possibility of Arden Hills obtaining a site at TCAAP for our proposed City Hall/Public Works/Parks Facilities. . We were very pleased to have had the opportunity to discuss the project and tour the potential site with you. We wish to commend you for the frank and open discussion which took place and look forward to continuing to work with you on this project which is SO important to Arden Hills. Per our discussions, please accept this correspondence as our official request to pursue release of a portion of the TCAAP property to the City of Arden Hills as a development site for new City Hall, Public Works and Parks facilities. In the interest of time, the City would like to pursue a lease of the property with an option, or a simultaneous pursuit, of an outright purchase of the site. In view of our discussions on Thursday, the City is asking for consideration of the release of the entire parcel which lies east of Hamline Avenue exclusive of the Ramsey County Archery Range and the National Guard training facilities (exhibit attached). Again, our thanks for your cooperation and assistance in this matter. If you require additional information, or if we can provide further assistance, please contact us for same at your earliest con venience. ;!~aiL-- Thomas R. Sa ther Mayor . cc. Lt. Co!. Joseph A. Daves City Council City Staff Dennis Probst/BRW Architects, Inc. PHONE: 1612J 633-5676 . FAX 1612J 633-7839 ------- , . . - :~, ---r ------ ------ --.-- - F · I I II 12 R-1 \ TWIN ~rTIE OR NANCE PL NT \ \ · PRQPO ED SITE ;l=.'\~ : .~ - I ; .~ ~B-2 '. . ..c'!!'~" I \ ~. ~"}. "~_............ -..-.... .....--. . ---If 1- :""'ii ~",~'::t 12 r:..';' : JJ~~lf:i~. "./ . "- ~ t..i.....;..... .:."J:~..:=2..::;.......:.Liuiji~i_~;;;: ,m . . : . l .~ -:1 Hlf~:"" ~ I h ~ ", -1 P ,,_.__i:',r~:- . "\~ I ~,- ~ ~m"r"~:"1" . ". ! ; a! - ..... 1\ 1;:;- ::t~~~ .. ~'\'\ -"II . m .~.... E ~.' i ~ ~ . ~ l"-:- . ~ ~ ....... ., = j:~ ~..'" l' ...... fn.lll.j '1i'''''''~' '" ~1 ..- ",>>> 0Ui1fi!..'I' .1., ~ '. ~ ~- ~:~===:, .J' ~f.s::-;n R 1# l ..- : : '. \. I I '/_ . -:r ~ , ..~:j:cm - -;;: . -,- 7, l...fUA-J' -~'::::'.. ()= 11:,--'1 : ~I~L '~,. . . ~':IL. : \ ~~, ~'t . ~ !! \ \ = .~ \5 ,) to, ..~. li \lJ ,,\v-.,-,i ./ " >;? '~",' /,.L :. ,,~ :H "\);1\ '.': . :/' ,'R-1 Iim " B 1 \", :.. - . I '. \I . _.. /' . - ~I: ~:r ..- l\~ .. .... f., \ -~iirr8Jl!!lll~l,1 .....~.-.j \\. ~~( "'f /..'.:.:,:........r... : '. ,y;.,.!!""GIll!!J)~wr91.. .., ",J' - ""'i,".... : . h-,....,/'" \,.. . "N r- "r t... ifu..\.'I::..t-- II.--d ..~ ~",.c'\. : . - ..... --" -"., - . 1 -".. 4Y ~"""'-Ill I L b - ~.~ ~t\::O ~ I\r _ '~'=~, H'lE~! ~ ~ ~ Dlb:~\-=.. 7.1\ V,'._J"'''; - I; R F ..n-::\ .) .... ~: I IB3 i, 'if:'::t.-.~. . ij~j~,I~~ I:....._l :1...,"1 ~~~~ tJ J=t 1""_ Q!>lE!ill i' '~t'~: ~~V}~~!IC1l -2 = - _.._.'_~M_' CJ.." "-' V1~ mmm- / Lf~ : =..:..-::;:.::-_::::.....-. ItIf~. " . - ,J~\. ~II AI !!~~lL - -----. .: "'~l\j ~I_ do "' ~ ......._n....... _ :::.- _ ,.., -=J - _.._nM_. mDlll!I' : ..' ..' lpS ~g; - j-.,'~' . - ._-,,-_. . . " ~ ~-- t-I...'...a........_l _... ..~.' ~ " .\\\\~ \'. ~ - ~,... -" Iii, . )!Jj "_.._...M_' ~ _ ~: R-l ~! ! 1JIj- I "'i1 ,f <". L, 'P/ 'N.~\ I . ~\ tf-- b "'::~';. ~L r I< Y.., ~ r"2~~ . B-2. '-~ t; ~~~W -,~ ' .....~.. =iftJ ._. ,,'-- :,c::l.... ,_no. "1 ---- B-2 """"', ,- ~ --- ZONING ~ : I ~ j~ -. -- - - ~ MAP n A ~ .....__ """"~ _ Jt. ~ ,-- ,.-. ./"'J == . OCT 21 '92 15:29 P.2 , -_..._~--- - Ramsey County Dep..ri~~nt of Public Works . ~ Admb:tJ.JIt;ratioA Paul L. Klrkwold, Land Sut1Jey Director and County Engineer 350 St. Pew lit.. RAMSEY COUNTY Salte 270 . St. Paal MN/55102 (/i12) 298-4127 FAX 292-6515 fn91l'le~rins Openl.tions 3377 N. Rice St. MEMORANDUM ShorelJl~w MN/55126 (612) 484-9104 Terry Schutten,Executive Director v\ FAX 482.5232 TO: FROM: Paul L. KirkwolW SUBJECT: Relocation of the County Public Works Facility DATE: July 7, 1992 Over the past few years, events have occurred which prompted on and off discussion with several people regarding relocation of . the County Public Works Garage facility. Several cities have indicated a need and desire to secure a remote location to store supplies and equipment. The current facility site, has been rezoned by the City of Shoreview and is now a "non-conforming" use. The current site was one of two or three identified for fur-ther consideration for a Suburban service center and, recently, a suburban. cour-t facility. The impacts of the consolidation effort point to one centralized facility which can be accessed by several agencies for joint equipment use, materials purchase, handling, and storage. Parallel with these activities, the Cities of Moundsview and Ar-den Hills are considering new facilities for their public works functions, and Shoreview is looking at an expanded facility winch will not fit on the cur-rent land available. The Shoreview City Planner, Tom Campbell, contacted the Twin City Army Ammunitions Plant (TCMP) and, after several months, a letter- was received indicating a willingness to discuss possibilities of using current structures' for a combined public works facility. :!:n May of thi s year, I was part of a group that toured those possibilities wi th Me Raymond Rabbett, Property Manager, TCAAP. The building review, to say the lea~t, was not encouraging . because of age, design, and access. The str-uctures ar-e about the same age as the current public.Works building and wer-e designed for- plant manufacture. They have flat r-oofs that requir-e suppor-t columns 12-20 feet apart and, with the exception of one, are not conducive for remodeling to meet our' needs. Access to these facilities would be via an extensive army security system. "" A......~I..... D.__ ,jl..-' ;;:;1 ~S2 1:;:29 P.3 , . Further discussion with Mr. Rabbett indicated a willingness on the u.s. Army's part to at least consider the sale or transfer of parcels of land to another government entity such as the County for future public use. Most recently, a transfer of property was accomplished with the u.s. Army Reserve which, I am told, is a different entity than the bL'anch of the . Army which owns and operates the TC.V.P. I have reviewed possible land parcel sites and .have found one which shows pr:omise for further consideration. The location is or) the extension of Hamline Avenue, appr:oximately 1/4 rni le north of T.H.96. This is the locati on whi ch was used by the Army Reserve prior to their new location on T.H.96 and Lexington Avenue. Thi~ 47 acre parcel can have convenient public access without Army security, is relatively flat, and was used in the past for heavy truck parking which indicates relatively stable soils. It is remote from the manufacturing buildings reducing the possibility of soil contamination. The location would be convenient to Moundsview, Arden Hills, and Shoreview for: frequent use, and relatively easy access for less frequent use by Roseville, for example. The dt s'advan tage of thi.s location for municipalities is that it is not the center of each city; therefore, it J:"equires extra . driving .time. out conRidering that 11 municipalities.are within 4 miles of this location, the economy of scale should outweigh these travel costs. 'l'he current Ramsey County Public Works facility is in the wrong location because of land values and the u~banized nature of the location. The cUrrent .facil i ty will also require extensive remodeling in the very near future. 13ecause of this, I am pursuing the relocation possibility further. I will be formally contacting Mr. Rabbett to identify the steps necessary to acquire the land (which I am told could take up to two years) . I have also ini tiated some concept design consider:ations within our own staff. I will also be contacting the nearby cities to get a better feel for their desire to use the facility. We have looked at costs in a broad sense and also methods of handling these costs. It is estimated a new facility including a storage/mechanical, engineering, and administration ~rea will cost $7-9 million. A complete analysis of the needed space will have to be. completed before a ' decision to proceed with construction is made. Financing of this effort could be comprised of County bonds, receipts of land sales for t~IO future asphalt plant sites (Taco Johns and Lexington/county Road E) and or sale of the current . Public wor:ks property, participation by communities for space use, or the municipal Opportunities if the relocation Occurs making the Rice/694 property avai lable. foe development and possible County dedication of CSAH receipts from future gas ta~ , - , . OCT 21 '92 15:30 P.4 . , , . increases. Analysis of the financing package should also be included in the in-d~pthstudy before the decision to proceed is made. The construction of the new facility could be completed within a yea::- from the time a decision to proceed is made and the land acquisition is complete or at least an indication the transaction. can be completed. I understand this expands the time frame needed for the suburban court proposal; however, a complete review of the benefits of using the current Public Works site for the courts may make the impacts of the extended time less significant. If the courts elect to proceed . at a different location, it appears the County' will benefit in the future in proceeding with the proposed land acqui si tiona t the TeMP; howeve r , the cvrrent conditions appear (on the surface at least) that it would be beneficial to consider a new facility for Public Works now along with the suburban court proposal. PK:mk ~ cc: :ommissiol,1er Duane M.cCarty . C (fer ~r- ".. I ....- (,~. -.'.,.... kJ/<L._ !,..--/" ..." , .. V'-I 0.::...:. :;1'- .l.~'..,:)1!J P.5 -'. - Ramsey County Department of Public Works ~ Adsalat-natioft Paul L. Klrkwold. L""d Survey . Director and County Engineer 3.$0 St.. P~lI1:" St. RAMSEY Coumv Sab.270 s..P..... MN/55102 (612) 298-4127 FAX 292"'515 Engineering Opera.tlons July 10, 1992 3377 N. Rico St. Sh.,..ovlew MN/55126 (612) 484-9104 FAX 482.5232 ML Raymond Rabbett << Property Manager Tw:n Cities Army Ammunition plant New Brighton, Minnesota 55112 DeB r Mr. Rabbett: In Hay and June of this yea. , you and I reviel'.'ed and discussed the possibility of utilizing structures or property at the TeMP fOj~ reIQ<:.ation of the Ramsey County Public Works Department. ! wO~lld ,. , to thank you for your time and the alternatives you .t.ll.:e provided for our consideration. The tour was beneficic11 in our . decj.si(in makj,ng process and 'very educational. One of. the pos.ibilities was to use existing buildings that could be remodeled for our use. After our revie'A' we have deter.mined thac for reasons of age, design, si ze, and access, this alternative would not provide for our needs and, ther;efore, I would not anticipate further consideration. You also mentioned a possibility we do wish to consider, which is the acquisition of vacant land or land which contains a structur;'e that is scheduled for demolition. One such parcel is of pal:cicular interest to us, and is one which I would like to pursue to a definite conclusion. That parcel is the approximatel.y 47 acre site pr.eviously used by the Army Reserve north of T.H.96 on the extension of Hamline Avenue. 'rhis location is of particular interest because of its possibility of convenient public access, a defined perimeter road, and the availability because of the recent move of the Reserve. I would like to investigate two avenues of acquisition: direct property transfer and/or long term lease. Because thi; deve lopme.n t costs for a new facility .will be in the range of $7-9 million, we need some assuran~e the land will be aVCiilable throughout the life of the development. I have discussed chi s action with. the Executive Director of Ramsey Coun ty ~lho. has . extended his suppor.t in this investigative effort. S AK~~I",cI P"hl 1l~"1~ SoybNn.Bll.illldln.il OCT 21 '92 15:31 P.6 .. '. . will you please direct this inquiry to the appropriate people who will help us complete the acquisition process. I would also be grateful if you could provide me with an outline of the process that must occur to achieve this goal, along with the names of people I or other representatives of Ramsey County could contact to expedite' what you have indicated is a lengthy process. Ramsey County is considering using its current public works site in Shoreview for the construction of a courts facility. Prior to making this decision.. some indication of the TCAAP possibilities is essential. I believe transact'ions such as that proposed. here are in the best interest of TCAAP and Ramsey County. The property use will revert from one public use to another. This type of intergovernmental cooperation is what is needed to best serve our customers -- the public. . I am looking fOr~ard to hearing from you soon. rf there is an opportunity to discuss my proposal with other TCAAP personnel prior to your response, ! would welcome the chance. please contact me or my secretary, Marsha Kurka, to arrange a time for .... - such a reeeting. . Sincerely, ?2!P# Paul L Kirkwold, P.E. Director and County Engineer PK:mk Attachments (location map) cc; Commissioner Duane McCarty, Ramsey County q- 'rerry Schutten, Executive Director, Ramsey County V( Catherine Iago, City of Arden Hills ~. Dvli gh t Johnson, City of Shoreview L>.: . f u. ------ , \ --P.7------_____.__ I "-.._.___...._.__.___~--. '-'>_____::::=:.....::__.. ______:--:::::::.__.__.~~.::\ '::.:~ l I on" "''','' / J<I~ -- ''''''-7~,"-=~~" "'-.-". .,_,_ ,- '.'-- ~ ~ - ~~- --- -, I ......,,= _..: ""':_:':::~---.:_- -. .:~ ! / ---- 'J.-.__-:__::__ - - ---.- c] 'Iii -- - -- I -------.. 11\ /,..."--"'>, C T- ' " I ,_ ''- .~l' 1,__ , "'--"" -. ". . - ,";;'-. ......, 'Ii -:::._ _ --,'--cc..' "" ~ 4\---- m__ \1;' _ .CO ri:l" (G= --- il ~ ,. " I' \"- " co ~ ii Ii, /" Q i '~ . ----:1 Q I, iI '" ~ I' U 'i " /) '\ ('J i: "I, U1f?c5 ii "'\. "! I Ii \', I', " . j. C I '":J Ii , J 1'1 I I, - 'i, I 'L__~ I" --.JI ___/ .._....._._ " , ----------.- '\ \~----_.._--:::::::-.:__..__.._~) (" . .--.- 0 Ii '---- -:=-.=-___.._..____ ': -.- I, r-- , (), i 1,1 :! ~ t.' I:i Ii ..J ./., .. " " " 'I I'! I, i'! Ii ." , il II 'l . 1 II --::::==:--. 0 , I . ",- -------- " 'I ----,,'- i ' ..) L- I, ,----, "f " /'" I' I" "\ I . __ il "'~\ Ii _ \ '. I 0 'Y) , ' 'I / I ____ " , , ---- '" "// I -- . '\ I < ~f ,( ", , '\ V ' I' '\"" " 1 __.n'__n" """" ~-- ----- 'I _. ' ..____ """ I ,'_______n._ , ......., . ----- ,I -'<:-" .~ II _______ ! . . -- ~ , .....'--.-..-. ,- ,1\ I -.-.-- --'---"~'-::-" \ :I '-" . _n '''. \.. 'I"" , '", " ",", I '.:\ :, ~...>, \\ :~, >" . '.: il -'.\. , " '" "', I I I III ~, ' !! " 'I:, ", " 'i .,'" I .,.' " " ",', /, '''' '" ,,' I, "'.,, "~I', ,. ", , " \\ \" ".-- ,.", \'" " ".", '" /,' ',\ 11 ~'- "", .- .' .. '. ., ":'" "', ..--"".... ""'" 1', '''''''''''' _____ "C', / '. '" ',,', ~ <:'i?""""'''' , '''\~ili "'''''''''''\.' -- i . .1, v' "'___'" f 1'\'" ',:", ...."'''''''11" ',' "'---"';'''''' ',__, :".f' ' " '" ',. ",,-- --, , \\ '! ""::",,,-, "",<~", '\"""," J " \. '. ", \\ ~ "-:::\ ' . ,\ I' \\ , ". ~ STATE OF RECEIVED NOV 3 1992 ~~rn~@lT'~ . DEPARTMENT OF NATURAL RESOURCES 500 LAFAYEnE ROAD, ST. PAUL, MINNESOTA 55155-4037 OFFICE OF THE DNR INFORMATION COMMISSIONER 16121296.6157 October 29, 1992 The Honorable Paul Wellstone United states Senator 123 Hart Senate Office Building Washington, D.C. 20510 Subject: TRANSFER OF THE TWIN CITIES ARMY AMMUNITION PLANT (TCAAP) Dear Senator Wellstone: I am writing to you about the possible transfer of the TCAAP property. It is our understanding that the city of Arden Hills has requested that you draft special legislation to transfer portions or all of the TCAAP property to the, city. I would like to suggest that we . cooperatively explore all state and local interests before you proceed with such legislation. The Department of Natural Resources has been assisting TCAAP in managing the natural resources of this property since 1967. We have been involved in management of wildlife habitat, including threatened species, fisheries projects, forestry practices, wetland protection, groundwater protection and have also been supportive of TCAAP's efforts in prairie restoration. Portions of this property contain outstanding natural resource values and wise stewardship of those resources is in the public interest. Federal laws and policy mandate that use of surplus federal property be offered first to governmental units representing the citizens of the entire state rather than one portion of the citizens. Such policy should not be altered without careful consideration of the needs and interests of all the citizens and governmental units of the state. This property represents a unique and potentially valuable parcel in the metropolitan area. Careful coordination is needed to ensure that the public receives the minimum risk from environmental contamination sources as well as the maximum beneficial use of this land. . , I Ie " i\ , It ' .. .- -. . .. -, ,-~ -- ~\-'~ tL. '- \J.j. I J l;tf:j .!~ -C".~, ! ~~ AN EOUAL OPPORTUNITY EMPLOYER RECEiVED NJ'; 3 1992 ~ ".,. o. ~~[g~@lJ~ . DEPARTMENT OF NATURAL RESOURCES 500 LAFAYETIE ROAD, ST. PAUL, MINNESOTA 55155-4037 OFFICE OF THE DNR INFORMATION COMMISSIONER (612) 296.6157 October 29, 1992 The Honorable David Durenberger United States Senator 154 Russell Senate Office Building Washington, D.C. 20510 Subject: TRANSFER OF THE TWIN CITIES ARMY AMMUNITION PLANT (TCMP) . Dear Senator Durenberger: I am writing to you about the possible transfer of the TCAAP property. It is our understanding that the city of Arden Hills has requested that you draft special legislation to transfer portions or all of the TCAAP property to the city. I would like to suggest that we . cooperatively explore all state and local interests before you proceed with such legislation. The Department of Natural Resources has been assisting TCAAP in managing the natural resources of this property since 1967. We have been involved in management of wildlife habitat, including threatened species, fisheries projects, forestry practices, wetland protection, groundwater protection and have also been supportive of TCAAP's efforts in prairie restoration. Portions of this property contain outstanding natural resource values and wise stewardship of those resources is in the public interest. Federal laws and policy mandate that . use of surplus federal property be offered first to governmental units representing the citizens of the entire state rather than one portion of the citizens. Such policy should not be altered without careful consideration of the needs and interests of all the citizens and governmental units of the state. This property represents a unique and potentially valuable parcel in the metropolitan area. Careful coordination is needed to ensure that the public receives the minimum risk from environmental contamination sources as well as the maximum beneficial use of this land. . AN EaUAL OPPORTUNITY EMPLOYER ~ "A" o. RECEIVED NOY 3 1992 ~[J:::!]rn~@lT~ DEPARTMENT OF NATURAL RESOURCES . 500 LAFAYETTE ROAD, ST. PAUL, MINNESOTA 55155-4037 OFFICE OF THE DNR INFORMATION COMMISSIONER 16121296.6151 October 29, 1992 The Honorable Bruce Vento United States Congressman Box 100 - Galtier Plaza 175 5th Street St. Paul, Minnesota 55101-2901 Subject: TRANSFER OF THE TWIN CITIES ARMY AMMUNITION ~CAll) Dear e sman Vento: I am writing to you about the possible transfer of the TeMP property. It is our understanding that the City of Arden Hills has requested that you draft special legislation to transfer portions or all of the TCAAP . property to the City. I would like to.suggest that we cooperatively explore all state and local interests before you proceed with such legislation. The Department of Natural Resources has been assisting TeMP in managing the natural resources of this property since 1967. We have been involved in management of wildlife habitat, including threatened species, fisheries projects, forestry practices, wetland protection, groundwater protection and have also been supportive of TeMP's efforts in prairie restoration. Portions of this property contain outstanding natural resource values and wise stewardship of those resources is in the public interest. Federal laws and policy mandate. that use of surplus federal property be offered first to governmental units representing the citizens of the entire state rather than one portion of the citizens. Such policy should not be altered without careful consideration of the needs and interests of all the citizens and governmental. units of the state. This property represents a unique and potentially valuable parcel in the metropolitan area. Careful coordination is needed to ensure that the public receives the minimum risk from environmental contamination sources as well as the maximum beneficial use of this land. . AN EQUAL OPPORTUNITY EMPLOYER - --- . Page two The Honorable Paul.Wellstone United states Senator October 29, 1992 We are not opposed to the city's interest in portions of the property but feel that there are more appropriate avenues, other than special legislation, to consider their interests and to reach a consensus as to the highest and best use of these lands. I would sincerely appreciate the opportunity to discuss the needs for cooperation and coordination in the future management of this property. Sincerely, ~ &JJr- Rod Sando Commissioner Minnesota Department of Natural Resources 102792.10 . cc: Lt. Colonel Joseph Daves, TCAAP Theodore Schulte, Commanding Officer's Rep. Thomas Sather, Ma:(or of Arden Hills David Leuthe, ActJ.ng Regional Adm., DNR, Reg. VI Michele Beeman, Office of the Attorney General . " . . CITY OF ARDEN HILIS MEXIlANOOM '10: Mayor and City CoImCil FIlCH: Dorothy A. Person, city Mninistrator M D1<TE: """"-,,Nor 18, 1992 SUBJECT: 1993 OaImi.ttee 1\ppOin'bnents To date, the following is a list of arrrent committee memberships. It is noted if they are interested in 1993 for reappointment. Also listed are others who have expressed interest to date. DESIRES '93 aHfiTl'EE ctlRRENl' MEJmER MEHBmSHIP 1992 cmZEN' S c:c:MITTl'EE Tam Merickel, Chair YES YES Carl Blomberg YES YES Dan Christensen YES YES Arnie Delger YES YES Ray McGraw YES YES . Charlotte McNiesh YES YES Denny Probst YES YES Jeanne winiecki YES YES 1992 FINANCE c:c:MITTl'EE San:lra Shrewsbury, Clair YES YES Joseph M. Corpstein YES YES Frances Holmes YES YES Charlotte McNiesh YES YES Chuck Mertensotto YES YES Carl Rundquist YES YES Ramanik Shah YES YES Thomas steele YES YES 1992 HUMAN RIGHTS Barbara Younoszai, Clair YES ? * Shirley Chase YES ? * RayConroe YES ? Gordon Dean YES ? Sushila Shah YES ? Rosalie Hedlund NO NO* George Larson NO NO * (Due to 1992 resignation of Rosalie Hedlund (tenn 1993-1995) and George Larson . (remainder of term to 12-31-94), plus Younoszai and Chase terms are completed, two 3-year vacancies exit). . ,. . . 1993 CXI!MI'l'rEE APPOINDIEN1'S Page Two 1992 PARKS & ROCRE'ATION CXlMMITl'EE David sand, Chair YES YES Mary Gillies YES YES Bill Guelker YES YES Lynette Kreidler YES YES Mark Labine YES YES Mark Literski YES YES Mark Magers YES YES Don Messerly YES YES David Moberg YES YES Alan Montgomery YES YES Megan Ricke YES YES 1992 PI1INNING ca1MISSION Dennis Probst, Chair YES YES Jeanne Winiecki, vice Chair YES YES David Carlson YES YES steve Erickson YES YES Raymond McGraw YES YES Scott Petersen YES YES Barbara piotrowski YES YES . 1992 PUBLIC SAFEI'Y / IDRKS cc:tolMITl'EE Richard Roessler, Chair YES YES Arnold Delger YES YES Richard Fregeau YES YES Bill Gillies YES YES tilslie Goldsmith YES YES Jean Lemberg YES YES tilslie Reindl YES YES Herbert Tatley YES YES OIHER INTERFSI'ID PARI'IES: Marty E. Rye (Planning Comm.) NO YES I will let you know if there is further additional interest prior to the January organizational meeting. DAP Its . . CITY OF AlUlEN HILLS mDlANOOM Dll!rE: ~her 15, 1992 TO: Dorothy Person, City 1ldmiJti.strator FRCM: catherine J. !ago, ZoniJtq 1\dministrator SUBJECT: Request for COUI1ci1 oirecti.on on Recreational Vehicle 1\mendments to ZoniJtq Code Listed below are the options for Council consideration, as discussed at the December 2 Plannin;J Meeting. Planner Bergly and I ne:J'lected to request action at the 12/14/92 Council meeting on this matter. At this time I am requesting this matter be discussed at the Worksession meeting to be held on Monday, 12/21/92, so that Connnission may schedule either an infornal or Public Hearing at their February 1993 regular meeting . ~~. OF 12/2/92 1'L1lNNIm MINtlTES: . Clair Probst and commission requested direction from Council to proceed and offered the following options: 1- Conduct an infornal hearing to discuss only the Recreational Vehicle amendments. Notice lNOUld be sent to residents expressing interest by letter or phone. 2. Conduct an infornal hearing to discuss all zoning Code atnerrlments . 3. Conduct an official public hearing to rli """.lSS the proposed Zoning Code amendments in lieu of infornal hearings. If Council prefers an official public hearing should it be held at Plannincr or Council meetincr. 4. Connnission also requested that Planner Bergly be authorized to prepare a diagram showing the area on INhich Recreational Vehicle parking would be allowed for residential properties. (Le. the J:uilding envelope as defined by setbacks on a typical resident lot). (8 1/2 x 11). CJI:rk . RECEIVED DEe 1 7 1992 THRE..SHERSOUARE I 1 DAVID I. BE:\ll\ETT 700 THIRD STREET SOUTH i 1 MARK G, SWENSON MiNNEAPOLIS MN '55415 DENNIS I SUTLIFF PHONE:l6121370-0700 J 1. "I DAVID LGRA.Hi\M FAX: 1612) 110-1378 .' 1"'1 PETER E. IARVIS r I OONALD W RL'\lGROSE . B . R . W . A R C H I T E C T S . I N C. DATE: December 15, 1992 TO: City of Arden Hills FROM: Jeff Oertel RE: Arden Hills Maintenance Facility Included below is a list of additional options for the public works facility. To help provide a clearer picture of the project as previously proposed, please refer to the original study dated June 25, 1992, and a memo dated November 16, 1992 for additional information. Within this memo we have tried to provide . several alternatives with the relative cost breakdowns for your review. Bear in mind that the building is far from a final design, with the costs being estimates only. Within the original cost estimates and as a part of the following altemates, we have included a contingency of 10%. The following are a group of construction alternatives in addition to the one proposed in the June 25, 1992 final report. We have taken some liberties in re-design, reducing building areas and reusing the existing site to illustrate the several possibilities. Note: The original, proposed design includes the new arsenal site with new site improvements (Le. paving, landscape, storage tanks, fencing, etc.), a new salt/cold storage building and a new vehicle maintenance/storage/office building. PROPOSED PROJECT: Original program and design as submitted. Site Work: $392,000 Salt/Cold Storage Building: $250,000 Y.M. Building and Components: $1.548,000 Total: $2,165.000 . e.c!. : AN AFFILIATE OF THE BENNETT RINGROSE. WOLSFELD ~RVIS. GARONER INC GROUP ARCHITEcrURE. URBAN DESIGN PlJINNING.TRANS RTATION. ENGINEERING MLNNEAPOLlS' DENVER' PHOENIX' TUCSON. Sf PETERSBURG. SAN DIEGO . City of Arden Hills December 15, 1992 Page 2 ALTERNATE n: Original design except that the vehicle maintenance/storage/office building area is reduced by 10%. Site Work: $392,000 Salt/Cold Storage Building: $250,000 V.M. Building and Comn<ments: $1A32.000 (reduced by $91,000 and 2,910 square feet) Total: $2,074,000 Comments: This is a fair, r<'J2SOtUlble option with rmly minor impactrm the project. AL TERNA TE 112: Original design except that both the vehicle maintenance/storage/office and the cold/salt storage buildings are reduced by 10%. Site Work: $392,000 Salt/Cold Storage Building: $225,000 (reduced by $25,000 and 1,000 square feet) . V.M. Building and Components: $1,432.000 (reduced by $91,000 and 2,190 square feet) Total: $2,049,000 Comments: The construction of salt/cold storage space is reliltively inexpensive when buill as a part of a larger building program. The savings of $25,000 does wt offset the value of the space/benefits. We recommend wtto consider this option. ALTERNATE #3: Original design except that the vehicle maintenance/storage/office is reduced by about 15%, or half of the proposed projected growth. Site Work: $392,000 Cold Storage Building $250,000 V.M. Building and Components: $1.389 .000 (reduced by $136,200 and 3,285 square feet) Total $2,031,000 Comments: Similar to Alternative #1, this alternate is still a good compromise, allurping for some expansion. . . City of Arden Hills December 15, 1992 Page 3 ALTERNATE H: Original program and new site but the vehicle maintenance/storage/office building is built out of a metal building system (i.e. a "Butler" building) in lieu of precast concrete and masonry. Site Work: $392,000 Cold Storage Building $250,000 Y.M. Buildine: and Comoonents: $1.160.000 (same area reduced in price by $229,(00) Total $1,802,000 Comments: There is a reasonable savings by going with this option. The majur dTllWba4k is whether the City is willing /0 accept the aesthetic, and understands that the building will oot be as flexible ur solid. ALTERNATE #5: Original program but modify the existing building into cold storage and miscellaneous storage, build new salt storage building, build addition next to existing building and make all site improvements. . In addition, reduce the vehicle maintenance/storage/office by 10%. Also make minor improvements to existing building (e.g. repair roof, walls, cracks, etc.). Site Work: $174,000 (savings of $218,000) Renovated Building/Storage: $80,000 Salt Storage: $120,000 New Y.M. Buildine:/ Addition: $1,351,000 (reduced by $172,000 and 2,190 square feet) Total $1,725,000 Comments: The construction process will be lIWTe cmnpliazted, the public works department will have to operate during construction (and must count on addititmaI dust, noise, inconvenience, dc.), and there will be some down time in telecommunications, eleetriazl service, sturage, gas service and other services. If this is all acceptable, if additional growth on the site is oot required and/or the city hall azn relocate the existing site, and if the existing site is oot as valWlble for other purposes, then this is a money saving option. . . . City of Arden Hills December 15, 1992 Page 4 ALTERNATE 116: Do not follow the program, build salt storage shed, replace buried tanks, build a cold storage building to accommodate many of the vehicles that would have been placed in heated storage, perform repairs to the existing building, comply with ADA and current codes, and do some minor interior improvements. Site Work: $150,000 Salt Storage: $120,000 Cold Storage: $330,000 Building Improvements: $130.000 Total $730,000 Comments: This option will do little to change operations and services, as the work included is mainly to bring the building up to code and add some additiDt14l cold and salt storage. We should be able to store about twelve to fifteen vehicles and all of the utility and park storage equipment. Thus, while cramped, we should have allTWSt all vehicles under cover with about one-third in heated space. . We can explore additional alternatives and go into more detail at your direction. The above should give you a better perspective of some possibilities. Regardless of the alternative, it would not be prudent to build a structure with only enough space to meets todays needs. Ukewise, if a new building is desired, features such as lifts, hoists and other servicing components should be a part of the design unless they can be simply added later. We shall be prepared to discuss this in more detail at the Monday Council Meeting. Please bear in mind that the above alternates do have many design implications, some of which we may not even be aware of without an actual drawing of layout /y cc. Denny Probst 1568.201 . -------.----- RECEIVED DEC 1 H 1992 /.;- -/5'- 7';2.., . , , /I~ / '.' 1~~vV ~-;/.<ka/v,/ b~u/ ~//~~ 11 . J:.~~A"7 ~~ tf. . ~ffUr~ 7". tJ& ~"'Cd;y "'- ~':i^;:<:/ or/" X A'-?'7f'-n:td'- 4&?.?7z/ {.-7 dcr a/ -4 ~~;lZ/ .-&-'~'d ~~/ f~~'~ , ~ ~ J ~ tM/ c:zd4~~;x /i[ ~ d: _/c~, /~jdrcZ;'~ ~T/-~ Xc; ~- ~ r . . (. .-en -c/ ::7~V'7t'l 3 / ~~t.c4Z1 Att6h/ ki/( t2 ~ ~r' ~ tbd c~';!. ~ ~UN: ~. a.- 4~ ~ A#~ 7 (2- ~?~-- de;ti;;;te-~ . .. (!I!.:~A ~~ G/ .~/ /;T~'aLL.__ ~~ /;-4'~~dlcd ~/ ~ //17</. 55// c7-- / / . I RECEIVED DEe 1 fJ 1992: . I/).- l1-q"J- '-f11cUfV 0mt,~cdku /JA<!:L ~ ~~ ~I WD)(UcL;fa i:/ltMutv- ~0 ~ ~ iJrh ~ta.V ~ ~~ 013; /Q'12 .' ~fJd -t!.L; ~U1U 4! 5/ a114 ~ rhk,. ~ 1u~ . w~~1UM4 ~ tv r;;;;r ;Jddd:,iJ ~ ~ . 1ft4J W -:tA0 ~ ~ .' ,)AU71 ~U<;IU. ~~ . ~U &0Mv d ~ -;:Jr.oi:-'" jb (})'J;o. f.. i iJ: w ' to ~ i:Au ,; . jU#4UL. . ~ ~ iAUZUlu;1:G[JV.o::t ' 51. ClI - ,~~.).)J'Ml "'-~ '. 1J,,d. .Ad , . W-6-~ vu.J ~I )N~ o.:v (tj ~. ~ 't1/0 WS. ~J~' t!W' "'dU~L/ /MJ{U / ~ /111 tJdl ~ }k~~ . '''-' jJ~ + (}W!~ 'pt#vt.') ~ {J)v (J f!d t. j ~~Q,- I . Jt.iMU . 1~34 LJ. !diE ~ cIJiiiy I Y1.{ru 55//2- . e~:~)~~~) -_. .- . RECEIVED DEe 1 g 1992 c4c. /~- /yfc:< / ~ e/~,> 9' ~/l'td:1 jll/#?-k!-<2 /' /:-0MC :1' "'/';7 ";X:?U:"-'2~ 41'4 ~;, /('%(/:I _,4A: {/&1 <-d,dc;4~ 4 ~ 1( ~'~ , . ~k~ fi ?/_ djltZt/z/ Y? ,/7k{.j,2C---.? ~/J/-ie ;2/Ui:,)Ij t:Z~r~' ~u;L.~., ~e-. ~d tltt'eh/~~:/, At/t;t ~- ?;> cz__ $Up ~IU C---~Ld_~'d . ~~u.~ ?tZ~7~' e ~ ~ ftY//z/, /:/~~J~l Jt-eUL"iu4&17 ay.u4t /Je- d~C e~$.4K--- ::;:~~k.~ C:2 t&!t! 7 . ! tz - i J~~~')~..a.Lp\-\ !39Y-~~~ --.. ~ s-) ( -;:;Z-----' . \ . . rI/,I~-:J- CONSULTING ENGINEERS Maier Stewart & Associates Inc. MEMO TO: City Council for December 21, 1992 Work Session FROM: Mark Graham, Maier Stewart & Associates, Inc. DATE: December 16, 1992 RE: Possible 1993 Street Maintenance Improvements FILE NO: 520-040-10 All streets were re-rated by members of the Public Works Staff this fall. Information was input into the City's Pavement Management Computer Program and lists were generated for streets requiring seal coating, overlaying or reconstruction. The computer ratings and field comments were used to formulate these recommendations. In addition, performing the same type of maintenance on streets within the same area generally allows lower bid prices, since the Contractor minimizes his travel time. Following are lists that Public Works Supervisor Winkel and I developed based on the ratings, field . comments and group location of streets. We have shown the ratings and estimated construction costs. For overlay improvements in residential areas, the City assessment policy allows for assessment of 50% of the total project cost to abutting homeowners. The assessment rate in 1991 was $2.82 per front foot. We would anticipate a 1993 rate of $3.00 to $3.25. For seal coating improvements, it has been City policy to not assess abutting property owners. We would not recommend a change in 1993 to this policy. . . . - ~rh I .J',,-, t . ~, .. .!).")'....;-,. -.;-~' "., ,~. ...~ '" (H~'" I'\Il{) 'I~ llu.ugclcu. a:m~..u:~ lur .l!:i~'} utret::t lYla1ntq.1:h'1~,3' _i{lpiU\tel;::~n~~ 1;:; ~ 1 ltJ,vv . PROPOSED 1.5" BITUMINOUS OVERLAY IMPROVEMENTS Street From To Rating Est. Cost Karth Lake Circle Hamline Avenue 2nd Cul-de-sac 59 $ 24,000 Nursery Hill Lane Nursery Hill Ct. 400' North 73 $ 32,000 Nursery Hill Court Nursery Hill Lane Cul-de-sac 73 $ 19,000 Amble Road Hamline Avenue Dead End 43 $ 21,600 Briarknoll Circle Snelling Avenue Cul-de-sac 23 $ 18,500 . 1959 SLOAN PLACE, SUITE 200. ST. PAUL, MINNESOTA 55117 612.774-6021 9800 SHELARD PARI0NAY. SUITE 102, MINNEAPOLIS, MINNESOTA S5441 612-546-0432 . Equal Opportunily Employer . Briarknoll Drive Norma A venue Briarknoll Cir. 35 $ 29,900 . Norma Avenue Briarknoll Dr. 500' South 56 $ 9,800 Gale Circle W. Floral Dr. Cul-de-sac 44 $ 11,100 James Circle W. Floral Dr. Cul-de-sac 48 $ 17,100 Dellwood Ave. Nursery Hill Ct. Amble Road 60 $ 14.000 Total $197,200 Less Anticipated Assessments $ 47.000 Estimated Cost $150,200 We .anticipate that. the bidding process would rcdu(,e these .:usts. We recommend 'bidding this group, and, if necessary, eliminating Nursery HilI Court, Nursery Hill Lane and Dellwood Avenue to remain within the budget. By eliminating these streets, the estimated cost would be reduced to $99,000. It is far prefarable to plan and notify residents of a potential assessment, then delete the work, than it is to receive favorable bids and then add streets, which would require additional public hearings. PROPOSED SEAL COAT IMPROVEMENTS S!rm From To Rating Est. Cost . Red Fox Road Frontage Road Lexington Ave. 51 $ 10,800 Pine Tree Drive Harriet A venue. Co. Road E 74 $ 4,800 Nortbwood Drive Red Fox Road Dead End 87 $ 2,900 Fernwood Court Ingerson Road Cul-de-sac 86 $ 1,400 Ingerson Court Ingerson Road Dead End 93 $ 1,500 Edgewater Avenue Lexington Ave. Dead End 97 $ 2.500 Estimated Cost $ 23,900 A separate issue also to be considered is patching and overlay on Kiethson Drive. Public Works Supervisor Dan Winkel anticipates a cost of $7,500 to $10,000. This would directly affect the scope of the overlay and seal coat improvements. We recommend that a feasibility study be ordered at the December 28, 1992 Council meeting, for the 1993 Maintenance Improvements. This will allow for the necessary public hearings prior to the 1993 construction season. MJG:db mem()-()KJ.dec . DRAFT(j(J . ARDEN HILLS CITY COUNCIL WORKSESSION MEETING COUNCIL CHAMBERS MONDAY, DECEMBER 21, 1992, 4:30 P.M. 4:30 PM 1. CALL TO ORDERIROLL CALL. 2. AGENDA ADOPTION. 4:30 PM 3. REVIEW OF CITY'S PAVEMENT MANAGEMENT PROGRAM AND COUNTY CSA PLANS. 4:45 PM 4. DISCUSSION OF STORM WATER UTILITY. 5:00 PM 5. DISCUSSION OF T.H. 51 AND OLD SNELLING AVENUE. . 5:30 PM 6. DISCUSSION OF CITY HALL AND PUBLIC WORKS FACILmES OPTIONS. 6:00 PM 7. REVIEW OF COMMITTEE APPOIN1MENTS (CITIZENS) FOR 1993. 6:15 PM 8. COUNCIL COMMENTS. 6:30 PM 9. ADJOURN. . The above times may be subject to discussion of the issue. -- . CITY OF ARDEN HILLS MJH:.RANOOM TO: city Jrall and Public Works Facility Citizen ClaImi.ttee FlICK: """"'" A. ......, city ~'n'__ ~ ~: D--her 3, 1992 StlBJEC'l': """-'her 21 Heeti.nq As you are aware, the Public Works Referendum for a Public Works facility failed by a slim margin in the November 3 Election. '!he Mayor and City Council invite you to attend their Worksession meeting on December 21, 1992, at 5:30 p.m. in the Council Chambers to review options of City facilities. Enclosed are copies of letters for your information and update. Next week, a listinJ of various options will also be forwarded to you. If you have any questions, please feel free to call me. We hope to see you on December 21. OAF Its . Attachments . )1/ /.J1I /c;l...- 0C. rJUlf~~ ~. (bi. il(lL( /.yp /l/i/ '. / '" ,/ ./ J;:-, " . CITY OF ARDEN HILLS ..1- I . 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112.5794 November 20, 1992 Mr. Roger D. Moberg 1308 Cannon Avenue Arden Hills, MN 55112 Dear Mr. Moberg: '!he City Council of Arden Hills received your letter of November 6, 1992. We appreciate your interest in the best an:i tooSt affordable service for Arden Hills residents, '!his, we agree, also applies to the referendum. question on the fundi.n:J mechanism for a Public Works facility. Following the referendum, we have returned to the evaluation point. 'Ihis includes reactivating the citizen's Committee an:i looking at needs an:i costs. '!he citizens' representatives an:i City officials review will be looking at options an:i potential c:han:Jes. Please feel free to a~. Please contact the City Hall for !lOre information. I will also . bring your letter to the attention of the citizen's Camnittee. If you have any further questions, please contact me at 633-5676. Sincerely, L~<'~ A~.~ Dorothy A. Per ~ City Administra or DAP Its , . PHONE: 16121 633-5676 . FAX 16121 633-7839 ... RECEIVED NOV 9 1992 c c ~ ('0,< .,<, ,fir- fttdo ~ D./h.,last" -130E: Ga.nn;:ln .~.yenu€- -t.<4' e' ~; ft: ;~"t:,. - ,{-,' Zk'4t,5d!or-- . 'rj'n~ill- 'pj !:"<:""'1' ,1Jo, '. t". ,I ~..IV ..... ..)..;' I .:. 11-6-92 Ma~'(K an,:J Council Moe-mt9~; ~~L~ Village of ,h.,rden Hills 1450 'West HiQhvYaI! 96 ., , Ard€'n Hills., Mr'! 55112 Dear Mayor and Council: Subj.: Public \Norks facili~y' Following the defeat of the prc.posed public work facili~1 proposal in thoe- roe-cent e ledio n I 'Nou!<:f like b:o pass on some thoughts regarding the failure of tllis proposal as ,-(Y'ell as offer a possible alternative for ,'outo consider. First, let me tell you my familll and I have nothing but the highestofpraiseforallof~'ou who are willing to serie our village -- mayc)r, council., appointed officials, and full time staff. Having lived in thE; I/illag;;. for thirt','-four years and novl' ,,;;.;;.ing ourson and his family move in to the communi!:';,' m<l.k<:ls me all the more appreciative of past and present village government. ~ I voted ag<l.instthe much needed proposal and'encourag;;.d my family to do tfle- sam€- -. only because I feel mostslTongly that the $2.8 million was absolutely out of sight as a public works facilir;,'. I am convinced V'te are getting 'Nants and needs mixed up. It seems the cost comparisons people make are in relation to otrlerslTuctures built by municipa Iities an,j othi?r govi?rnmi? nt agi?ndes. In one of the local papers I saw a ,jraYiing of the proposed building. For the space i'oU are 'Nanting tc. bu)' that is too much mo~y! We need a building and V>Ie prob;3.biy ~-ed itworsi? than an;.' othHbody in the SW.ti? i <l.gri?e. HO'rte'/H, there ari? ;3.lti?rnatives <l.n<j we shoule:! not look b) otMr municipalities to see how tt'ie)' have waste(:! money. Having been on the Planning Commission <l.nd Board of ,b,ppeals some years <1.90 and having gon<3' through an apprentici?ship in the building trades even more years ago I do have a bit of an undersc-J.n,jing of construction and costs. 'We have b) geta\I'i~3.;i from the square foot3.ge cost guid€-Iin€-s as given t:o/ some of ,:our ard1it,;-ctand big builder friends. Let us take a lo.)k at "1'Ihat, for €-xamp/e, a lTucking cornpan~! migi'ltput in for their 'fer.; adi?ql.j;3.t.s- shops a.nd stomgi? , am quite familiar v'fith modern pole buildin9S and I'd like to suggest YOIJ consider whatU'ley col.lld be to the './illo.'j''', First, regarding pole buildings, migilt I suggest you drop an:~ bias :r'ou rna'i havi? and lo()k ()pen rnind",dl\-' at t!1E; fin.., US,).ble slTuctur.,.,; aVail;3J)le to(f;:J.\,'. C1f(:ow"se, on'6' I~fttlese coul(! be l:crnt)jnt&(i "~,vitrO! a td()ck: or~3te8! , . "ITIIAtIW' -. :J--'r'j "r"k- ',- h I il'-'I.'.-- j'j"---"1 'L_ ___.L_'.'_ ,.. c'.. '__L -.I .'....__ ~ ~.c:: ( e::d ~( . ,..., [() -,;J t....()I...irl.;I.~, r:'c' t r1;;':.~::': ~\ ~1a:.;lfY~(i llli ~;:t~:.l_ ~~Iue IfllHt::' li:1.~:;:. . rl"Ur.;""" ,^.f '.I..'3rc '1 n'~ 'fl- (.' <'1'''" G^ny' I" "'3,' lrif'lll'''I'T'' *'Whjf"c rh,o.r,:. ell" miqhr ':1i'-l"" "'..., .... ...'... _.'. ....)'.. '..0"\'. "':.'.":7'.. '_' '....'...' ~ ..'~' '.."'. .... '::V'.JJ .'....__ V',,-'. '.""_-'00..,., _' _~.. .0' r; -"\ jl '(~., ., / [J" . i '",-) , :., - \,. ... ... L.i .._,'j - ---. - '- .-'~ - -.r Ii /- , Q . c--.... /.>,'.0/1-2. /. (I .,~ Cl,-t..., - . CITY OF ARDEN HILLS 1450 WEST HIGHWAY 96 ARDEN HILLS. MN 55112-5794 December 3, 1992 Mr. Paul Straumann 4380 Arden view Court Arden Hills, MN 55112 Dear Mr. Straumann: '!he city Council of Arden Hills received your letter of November 18, 1992. We appreciate your interest in the best and most affordable service for Arden Hills residents. 'lhis, we agree, also applies to the referen:lurn question on the fun:l.iIxJ mechanism for a Public Works facility. Following the referendum, we have retuJ:ned to the evaluation point. '!his includes reactivatin;J the Citizen's Committee and looking at nee:3s ani costs. '!he citizens' representatives and City officials review will be looking at options and potential charges. Please feel free to atteOO. Please contact the city Hall for m:xe information. I will also . bring your letter to the attention of the citizen's Committee. If you have any further questions, please contact tre at 633-5676. Sincerely, c:?/~ Dorothy A. City Administrator OAF Its . PHONE: 16121 633.5676 . FAX 16121 633-7839 RECEiVED ~QV 2 0 1992 . Paul Straumann 4380 Arden View Ct Arden Hills, MN 5511 November 18, 1992 city of Arden Hills c/o Mayor Tom Sather 1450 West Highway 96 Arden Hills, MN 55112 Dear Mayor Sather: I am writing this letter to express my opinion on the recreation sites near the new city hall. I think it would be a great idea to build recreational areas around the new building, as long as we make sure we don't take up too much of the wetlands. I am aware that a rare species of turtle lives near Sunfish Lake. It would be a tragedy if their habitat was destroyed. I appreciate your previous precautions . taken for the turtles during the construction of the new Army Reserve Training Center. It would be nice to have an ecology area near the city hall. There could be a tour through the wetlands for public use. It could also be used for an educational tool for science classes studying the environment. Thank you in advance for your consideration in this matter of protecting our unique turtles. Sincerely Yours, ~~~ Paul Straumann / . '11",20/ /.:2..-- '-- ~I 0[:. I j -11-'.: I_l ;__,,) O.ic/..... (i . II J; . -~jV (.-,UII!; ( ----- CITY OF ARDEN HILLS . 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 December 3, 1992 Mr. Todd Rannow 1875 Noble Read Arden Hills, MN 55112 Dear Mr. RannOW": the City Council of Arden Hills received yoo.r letter of November 11, 1992. We appreciate yoo.r interest in the best and most affordable service for Arden Hills residents. 'lhis, we agree, also applies to the referendum question on the fI.trx:linJ mechanism for a Public Works facility. Following the referendum, we have returned to the evaluation point. '!his includes reactivating the citizen's Committee and looking at needs and costs. '!he citizens' representatives and City officials review will be looking at options and potential chan;Jes. Please feel free to atten:i. Please contact the City Hall far mre infomation. I will also . bring your letter to the attention of the Citizen's Committee. If you have any further questions, please contact me at 633-5676. Sincerely, ~c:P~ Dorothy A. City Adrninistrator CAP Its . PHONE: (6121 633-5676 . FAX (6121 633-7839 NOU<?Jo1ber / ~ /W:1. LPAr /'A /111 RECEiVED :!~V 1 3 1992 .- . '/r. vlo..ycrr I ,I've receIved IAe ;;'1j7ressiol1. ;:'ONL -severo.../ t1elN~er reFrl-s fh"",,/- jC>x ckYl 'f. kto..:. '-'Vhj lite O'iZMS of 4rde/1 J-/;/Is vole) ~;'s.L fh.e I'~!:c.. vvorks b",.,;!j;1}J bond relereAj~. I ~ I/Ot-<.... ~ Ihe COLU/C'-!, 10 do a.. I I VOlo<. G:Vl 10 /3.) I . l- OtA../- wh.v, ~lA- -.us;" do .J.ks if yoo-<- w;sh Ie bt?51 serve jaW' 'peor-/e.. '"The. l7ew>rY'~r~ 1....okJ ft71A.,. as 1'1Ai../~ Jue'S'~es as Ie wAy Me /eler - erZdi-t1Y! v...J.:<S voQ dow,,-z, cvz.d ,the;'[ ,/ij;c~jd Ihe./. jC>L<- cvuI fite CDlA/ICi/ ,',z~J b frta.l.e. ra/lS !:n- Me ~~re) vvJuch /AJi// s-Y'posdf be ~sed o't -fhese jKe.s5es, Aya./~}.I w-:r.)"0<-4.. -k nc,,L __51 M.J.e :J~:;ses} "bJ.J.o.J:;,j ~ !:-6if'1 vo/as IA.>~ vokJ ""Jt:Unsl- f.he rekrG';tdtA.JO"\) why. f' 1/ he;" jolA. .fel- :> /.:..r,Lec/ by Ie ih~ yo~ why I voId c:Ja.J";zsJ- f/'e rekre"c/l-UI'1. JIve v,~rl-d lite. Gll' ;..1..// severe:J .J-/~es 4/lj rIVe see/l Ilte rl'c lA.>orAs ~-/;.he5, ~l^-'re njM {..<JJU/I Y&IU ><Y, ".fk...!- '5 "'- J1.o-hn;v""';er. " We Jo need ""- I'lew Oly 14// CV/.d we do l1~u!d 0<- new ,P~/;c ",",oris build?!!, 13td- I l/oled ?nsJ- 1 . _ 1~~~ (Ie'. ["'. Hd-:J-f ,--7). f2vv0,':}U .//ze- referendulYt beccU<se. I Wa$'J'7 If con ",,'-teed .f"'~..;" we GoJ) j~hly 5jend,'!J it.2.'lT w/I//;'o/1. ~olice ilza..J...1 dtd/l'f sa.;' fA.::..!- 0.. :tj..<6m//hol'/ publc /.Voris ki)j G:><-<IJ ~ be juskhed) blA./- . jh~j.. .f wasn 'f GYZvirlced ~) ;) ~j be. j<A.$khel) O/her vo/.ers JLJ.l 've o/'ckn !-o hcd Me ;5'afl1.e CJ::>YJ.Cerrt. Now i:' lNoJcI be a. sho.M.e ilfOi-<. ev1J !he C~Uk:.i / !No...}) male?kv..s tn- Me !2../....../'e based ,t>rt M{.. &t.~Sw>1.r/-;OY1 .J.Ju:..~ "'-$ rrhu- 7:M fuehrer i/1 ]/15 CV'/./c.le ;/1 fte glA//e/'~ :5.:Ud) /lAy-elm I.j;J~ voters Nov. '3 dec.;ded Ik./ !he cil-I dJ;?'f ltuJ .... I'LeI.0 rvJ,//c ~ls ~i!;~... " I, ...".d Me. vol-ers .I ~e 1#;;.41 de! J'lc,f dec.ide t) Me c..i ty jid" Ij. /'Jeed a.. l1ew j<-<6/:c. wcsrl:.s c.; It I-y" - we dec.idei .;..k) the eil-y did" j. need Ik.5 ~q' mdltm ;:"'olJy. 1 don ,} "'-''VII #us letf<!'t' 10 5or41j nejoJ./ve. I belteve Mal- Ie."" C</1) Ihe CCJlA.;'/ci/ o...re dol~ ""- jool job .:mj 1 ~ c.cmfckl1l- Ih~ y~"'- w;11 do w~J;s r:.JhJ- i., Ik.s s;fl.1A.h"on.. ((c>-;(\'''o~ l~JJ ~ -1;:JJ . Jr1 e 2." 21 5' ;;... (+: 1/.5 j.. \ 11-' . THRESH ER SOUARE st.k DAVID I. BENNETT 700 THI RD STREET SOUTH MARK G SWENS01\ MINNCAPOLlS Mi\ ~~.::~ . ~ DEN:-.II$ LSUTLI;:'T PHONE 16Q: "37(1-(1700 ~"."",.- DAVID L CR>\HA\1 FAX, [6121 170-1378 .'t,'~"<-:" PETER E iAR\'~5 >.~'I<:. DONALD W RINGROSE .zl. . B . R . W . A R C H I T E C T S . I N C. MEMORANDUM DATE: November 16, 1992 TO: Thomas Sather Thomas Mahowald J oann Growe Dale Hicks Paul Malone Dorothy Person Dan Winkel John Buckley Denny Probst FROM: Jeff Oertel . RE: Arden Hills Maintenance Facility 1568.ZOl Estimated Cost Breakdown The following is an estimated breakdown of costs for the public works facility including the heated storage/maintenance and offices building, site work, gas islands/storage and cold/salt storage building. These costs do not include tools, furniture or equipment other than lube systems, cranellift systems, electrical systems and mechanical systems. Since the plans at this time are very schematic, a highly detailed breakdown of building components would not be very accurate. SITE WORK 1. Earthwork $ 140,000 2. Bins, fencing 40,000 3. Utilities 45,000 4. Paving, curbs 110,000 5. Site lights 12,000 6. Gas islands/pumps 25,000 7. Landscal1e. din 20.000 II-;<'-'iz- ~ . Subtotal $ 392,000 eCV'L':; f . ,rj, J i \./ liU LIt' ... '-< - ~ - ~'/I (J 'trJ-'~'fj/!_L (/!tV. AN AFIIU,\T[ OF THE [JENNETT RINGROSE. WOLSFELD (ARVIS GARDNER INC GROUP ~~a. ,\r~CHITFCTUf~[ IJ!{llAN DESiGN PLA.NNING.TRANSPORTATION ENGiNEERING MINNL.A.POLlS' DENVER. PHOENIX. TUCSON. 5T PETERSBURG TH RESHER SOUARE II.. DAVID L BENNETT 700THIRD STREET SOUTH MARK G SWENSON MINN[.I<.POUS MN s~.m ., ~ DENNIS LSUTLlFF PHONE 16121 "l7(l-07("" ,...,..".'~ DAVID L GMHAM FAX. 16121 "liU-I"liB ~I..l~ PETER E IAR\'tS DONALD \1,1 RINGROSE . B . R . W . A R C H I T E C T S . I N C. MEMORANDUM DATE: November 16, 1992 TO: Thomas Sather Thomas Mahowald Joann Growe Dale Hicks Paul Malone Dorothy Person Dan Winkel John Buckley Denny Probst FROM: Jeff Oertel . RE: Arden Hills Maintenance Facility 1568.Z01 Estimated Cost Breakdown The following is an estimated breakdown of costs for the public works facility including the heated storage/maintenance and offices building, site work, gas islands/storage and cold/salt storage building. These costs do not include tools, furniture or equipment other than lube systems, crane!lift systems, electrical systems and mechanical systems. Since the plans at this time are very schematic, a highly detailed breakdown of building components would not be very accurate. SITE WORK 1. Earthwork $ 140,000 2. Bins, fencing 40,000 3. Utilities 45,000 4. Paving, curbs 110,000 5. Site lights 12,000 6. Gas islands/pumps 25,000 7. Landscane, dirt 20,000 /I-/f-j.z.. . - Subtotal $ 392,000 CC'~'Ll.U f' , ( ) 'eLf. \ // v,']; "'(1 '1' . , o [[.'a'...LJn AN AI-I- ILlATE OFTHE HEN NETT RINGROSE.WOLSFELD JARVIS GARDNER INC GROUP .J.-u-?O. Af~CHITFCTl1r~t URBAN DESIGN. rlJl,NNING.TRANsrORTATION ENGINEERING MINN[APOLlS, DENVER. PHOENIX. TUCSON. Sf PETERSBURG Public Works Building Committee . November 16, 1992 Page 2 BUILDINGS l. Heated building shell $ 858,000 2. Benches, signs, etc. 15,000 3. Cranes, lifts 40,000 4. Mechanical 390,000 5. Fire suppression 20,000 6. Electrical 200,000 7. Salt/Cold storage building 250,000 8. Bond. permit. etc. 50.000 Subtotal $1,773,000 TOTAL COST $2,165,000 . For comparison purposes, review the following three projects for scope of work and costs: 1. Woodbury Public Works . 43,000 square foot new building . All new site work and components . Minor repair of existing building and site . $3,123,000 total hard construction cost (8% +/- dedicated to existing site) . Cost per square foot new building and site only:: $67/SF +/- (all heated building areas only, with a full range of site amenities). II. Plymouth Maintenance Facility . 74,000 square foot new and remodeled facility . Remodeled area approximately 8 percent . $3,680,000 total hard construction cost . Cost per square foot of total building and site :: $5G/SF . Work includes heated building, 6,100 square feet of attached cold storage and a full range of site amenities). . Public Works Building Committee . November 16. 1992 Page 3 III. Eagan Maintenance Expansion . 5,600 square feet of new construction, 1.200 square feet of remodeled area and 4,600 square feet of separate cold/salt storage . Site work is limited to new parking, walkways, some lighting, oil tank replacement and a few other minor items . $600,000 for new building and renovation . $120,000 for cold storage . Cost per square foot for heated building/site work = $88/SF . Cost per square foot for cold/salt storage/site work = $26/SF IV. Proposed Arden HillsPublic Works . 29,000 square feet of heated building . Full array of new site components . 11,000 square feet of cold/salt storage . . $66/SF for building and site work . $23/SF for cold/salt storage . $54/SF average cost per square foot . Reminder: Costs per square foot increase as total area decreases or is relatively small. , JEO(Ch . - 1t11780 . 'r u--./ CITY OF ARDEN HILLS . 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 ~ 16, 1992 Mr. Dan Iappin, Orief General Iaw/Congressional Affairs Division Office of Counsel Department of the Army Headquarters u.s. Army Ar:mament, Munitions, an:! Olemi.cal Cammarrl Rock Islam, II, 61209 Dear Mr. Iappin: As you are aware, the city of Arden Hills asked for a citizen vote on issuing general obligation 00n:1s for construction of a Public Wm-ks/Parks facility. Unfortunately, this referendum failed by a very slim margin. one issue believed to be a factor is the uncert:ainty of the site location. 'Ihi.s issue is llrpxtant to Arden Hills voters to be able to rrove ahead in makin;J their decision in this project. '!he City Council =ntinues to "''''_'''':iuize the continued need for Public Works an:! " City Hall builc:li.nJs. 'lhi.s need is cont:inuinJ to be addressed by a citizen's Committee an:! the city.' . '!he primary site location for these two b.1i.lclings =ntinues to be on the previously identified TaW' property. 'Ihi.s Ian:! is adjacent to a similar use (the Reserve Center) an:! adjacent to a state Highway provi.di.rq access by the ~lic at an optimum. We appreciate you time in this review. Please advise the City of any information you need. :;t:fttL ThomasR.Sather Mayor CAP Its =: Senator Paul Wellstone Senator David Durenberger Representati va Bruce Vento Theodore Schulte, Camnan:ling Officer's Rep. . ,_, "',: /7 ~'r.....~?_,- ',''-l. ) __j 1.//" '_} /" '- ,---<.>-_4.[...< /) -I j] !'"-(1 PHONE: 16121 633-5676 . FAX 16121 633.7839 If./ g.'};; ~ CITY OF ARDEN HILLS . 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 November 16, 1992 Mr. Rod Sardo, Commissioner Minnesota Department of Natural Resoorces 500 Lafayette Road st. Paul, MN 55155-4037 SUBJEX:T: Transfer of '!Win cities Arnri ADmtnition Plant (TCAAP) Dear Commissioner Sando: '!he city has received a copy of yoor october 29, 1992, letter regarding potential use of TCAAP property in Arden Hills. I welcome an opportunity to meet with you to clarify the City's needs f= use of this land. I have left several tel~ uessages askiIq f= a return call, b.rt have not yet received one. As you knoW', TCAAP property is located entirely within the city of Arden Hills, As such, b:Jth TCAAP and its caretakers (private = public) have worked closely with the city through the years to address its issues. . 'lhe space nee:3s f= the City I:ui.lcJ.in;Js are l.iJnited, and are adjacent to current development in the Reserve site area am the =rent TCAAP I:ui.ldi.n3" area. Due to this similar use am limited space needed,we believe this land use need is a unique situation ani the years of processing is not required. 'Ihis past SUIrUller, City ani 'ICl\AP represantatives met to review space needs. During this meeting, additional space was identified north of the l:ui.lding site. However, the City does not anticipate active use of this area. '!he land is on open space with wetlan:is in the majority of the area. 'lhe natural resource =ncern you eJ!Pres5 does not apply to this lam area. We believe this use to be the best use. Again, I welcome the opportunity to clarify these issues. Please call City Hall at 633-5676. :;::'YIMi-- '!homas R. Sather, Mayor DAP Its cc: Governor Al::ne Carlson Senator Paul Wellstone Senator David Durenberger Representative Bruce Vento . Lt. Colonel Joseph Daves, TCAAP '!heodore Schulte, Commanding Officer's Rep. David Leuthe, Acting Regional Adm., DNR. Reg. VI Michele Beenan, Office of the Attorney General PHONE: 16121 633-5676 . FAX 16121 633-7839 ~ (rfAe/'i'{ ~v) . CITY OF ARDEN HILLS 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 October 2~, ~992 Mr. Dan Lappin Otief, General Law/Congressional Affairs Division Office of Counsel Department of the Anny Headquarters U.S. Anny Arnament, Munitions, and Chemical ComIrand Rock Island, IL 61209 Dear Mr. Lappin: As you are aware, the City of Arden Hills has expressed interest in the TCMP property on the east side of SUnfish Lake and just north of the new Reserve Center site for its new City Hall and Public Works/Parks facility. Enclosed are copies of previous co=espondence in which the City has expressed this interest. In the November 3 General Election, the citizens of Arden Hills will vote on whether they wish to bo=ow on a general obligation bond of $2.8 . million for the construction of a Public Works/Parks facility. '!he City will be financing the construction of the City Hall through other fund sources . I will update you following the November 3 General Election on the =ent status of the construction. 'Ihank you for your t:i1ne. Also enclosed is a copy of infonnational items that have gone to the public. If you have any questions, please contact me at (6~2) 633-5676. Sincerely, ~~~ city Admfuistrator OAF Its Enclosures . nu".,~. .r!''''~'11 ~...... e!......... P'.~ ._.._. ___ ___.... CITY OF ARDEN HILLS 1450 WEST HIGHWAY 96 . ARDEN HILLS, MN 55112-5794 July 22, 1992 Theodore E. Schulte Commander's Representative Twin Cities Army Ammunition Plant New Brighton, MN 55112 RE: Arden Hills City Hall/Public Works/Parks Facility Dear Mr. Schulte: Thank you for arranging the meeting this past Thursday with Lieutenant Colonel Daves, Mike Fix and yourself with Council Member Mahowald, Dennis Probst and myself to discuss the possibility of Arden Hills obtaining a site at TCAAP for our proposed City Hall/Public Works/Parks Facilities. . We were very pleased to have had the opportunity to discuss the project and tour the potential site with you. We wish to commend you for the Frank and open discussion which took place and look forward to continuing to work with you on this project which is SO important to Arden Hills. Per our discussions, please accept this correspondence as our official request to pursue release of a portion of the TCAAP property to the City of Arden Hills as a development site for new City Hall, Public Works and Parks facilities. In the interest of time, the City would like to pursue a lease of the property with an option, or a simultaneous pursuit, of an outright purchase of the site. In view of our discussions on Thursday, the City is asking for consideration of the release of the entire parcel which lies east of Hamline Avenue exclusive of the Ramsey County Archery R.,nge and the National Guard training facilities (exhibit attached). Again, our thanks for your cooperation and assistance in this matter. If you require additional information, or if we can provide further assistance, please contact us for same at your earliest convenience. :;r~ /iiL--- Thomas R. Sa ther Mayor . ce. Ll. Co!. Joseph A. Daves City Council City Staff Dennis Probst/BRW Architects, Inc. PHONE: 16121 633-5676 . FAX 16121 633-7839 , _n...... , , , " - #=- - ---. . 1 I h 12 R.l T WIN ~ I TIE" o R NAN C E P L N T SITE 1 ...... I --............... -..-...... .....-. 12 . . il ii Ii .... . ~. . B 3 Q!Sl!l!m - -. '-' --... ..-. - -..._.-....__...Mct - --....-................-..-. _ .-................-. - ......_n.._1 - -....--....-. _ ____n..._1 _ ......."'.......-, _ ..1'1...._'" " -............-. M ......._........_~ -.a.........._. - . --- ZONING 1~ _.M ~ .. .... - - MAP :-:.::.-:: ~--,=..~ - . OCT 21 '92 15'29 P.2 --- ----~~--- - Ramsey County Dep.".~~nt of Public Works ~ Ad_b:tlMtratlo.- . P au! L. Kirkwold, Lond S"rvey Director and County Engineer 350 St. ..... St. RAMSEY COUNTY Salt.. 270 St. Paw lIflli/5S102 (6J2) 298-4127 FAX ~1l2",515 Engln..rtng Op."'tions 3377 N. Rk:. St. MEMORANDUM ShOT.YI.w MN/55126 (612) 484--9104 Terry Schutten, Executive Director J\ FAX 482-5232 TO: FROM; Paul L. KirkWO~ SUBJECT; Relocation of the Countypul:llic Works Facility DATE: July 7, 1992 Over the past few years, events have occurred which prompted on and off discussion with several people regarding relocation of the County Public Works Garage facility. Several cities have . indicated a need and desire to secure a remote location to store supplies and equipment. The current facility site. has been rezoned by the City of Shoreview and is now a "non-conforming" use. The current site was one of two or three identified for further consideration for a s\lburban service center and, recently, a suburban. court facility. The impacts of the consolidation effort point to one centralized facility which can be accessed by several agencies for joint equipment use, materials purchase, handling, and storage. Parallel with these activities, the' Cities of Moundsview and Arden Hills are considering new facilities for their public works functions, and Shoreview is looking at an expanded facility which will not fit on the current land available. The Shoreview City Planner, Tom Campbell, contacted the Twin City Army Ammunitions Plant (TCMP} and, after several months, a letter was received indicating .01 willingness to discuss possibilities ~f using current structures' for a combined public works facility. In May of this year, I was part of a- group tha1: toured those possibilities with Mr. Raymond Rabbett, Property Manager, TCMP. The building review, to say. the lea~t, was not encouraging because of age, design, and access. The structures are about the . same age as the current public Works building and were designed for plant manufacture. They have flat roofs that require support columns 12-20 feet apart and, with the exception of one, are not conducive for remodeling to meet our"needs. Access to these facilities would be via an extensive army security system. If'\. A...."..IM"~......,,__ - . OCT 21 j92 15:29 P.3 I I . Further discussion with Mr. Rabbett indicated a willingness on the u.s. Army's part to at least consider the sale or transfer of parcels of land to another government entity such as the County for future public use. Most recently, a transfer of property was accomplished with the U.S. Army Reserve which, I am told, is a different entity than the branch of the 'Army which owns and operates the TCAAP. I have reviewed possible land parcel sites and ,have found one which shows promise for further consideration. The location is Ofl the extension of Hamline Avenue, approximately 1/4 mile north of T.H.96. This is the location which was used by the Army Reserve prior. to their new location on T . H . 96 and Lexington Avenue. Thi~ 47 acre parcel. can have convenient public access withou t Army security, is relatively flat, arid was used in the past for heavy truck parking which indicates relatively stable soils. It is remote from the manufacturing buildings reducing the possibility of soil contamination. The location would be convenient to Moundsview, Arden Hills, and Shoreview for frequent use, and relatively easy access for less frequent use by Roseville, for example. The di~advantage of this location for municipalities is that it is not the center of each city; therefore, it r-equires extra driving, ,time. Sut conRidering that 11 municipalities are within . 4 mile. of this location, the economy of scale should outweigh these travel costs. The Current Ramsey County Public Works facility is in the wrong location because of land values and the uJbanized nature of the location. The current .facility will also require extensive remodeling in the very near future. Because of this, I am pursuing the relocation possibility further. I will be formally contacting Mr. Rabbett to identify the steps necessary to acquire the land (which I am told could take up to two years) . I have also initiated some concept design considerations within our own staff._ I will also !:le contacting the nearby cities to get 11 !:letter feel for their desire to use the faCility. We have looked .at costs in a broad sense and also methods of handling these costs. It is estimated a new facility including a storage/mechanical, engineering, and administration area will cost $7-9 million. A complete analysis of the needed space will have to be. completed before a _ decision. to proceed with construction is made. Financing pf thi 5 effort could be comprised of County bonds, receipts of land sales for two future asphalt plant sites (Taco .:rohns and Lexington/county Road E) and or sale of the current publi c Works property, participation by communities for space . ' use, or the municipal opportunities if the relocation OCcurs maki'ng the Rice/694 property available, for developmerJt and possible County dedication of CSAH receipts from future gas tax , , , OCT 21 '92 15:30 P.4 , . , . increases. Analysis of the financing package should also be included in the in-depth study before the decision to proceed is made. The con$truction of the new facility.could be completed within a yea::- from the time a decision to proceed is made and the land acquisition is complete or at least an indication the transaction can be completed. I understand this expands the time frame needed for the suburb,m court proposal; howeve r , a complete review of the benefits of using the current Public Works site for the courts may make the impact-s of the extended time less significant. If the courts elect to proceed 'at a di ffe rent location, it appears the County'will benefit in the future in proceeding with the proposed .land acqui si tionat the TCAAI'; however, the c~rrent conditions appear (on the surface at least) that it would be beneficial to consider a new facility for Public Works now along with the suburban court proposal. PK:mk ~ cc: Commissioner Duane McCarty . C {l.Ll 0'- ~ ! , C! ,.-.~- '" -"-" ())t"..L.- \..-.f" ..", . . , ", 1,,1'-'1 C. :;>.::. .l..,:,......:l"-l P.5 , - _ Ramsey COUQty Depan.ment of Public Works ~ M",lnlan-atl"ft Paul L. Klrkwold, L.nd Survey Director and County Engineer 3$0 SI. P.... St. . RAMSEY COUNTY Salt. 270 St,P....1 llIN/55102 (612) 298-4127 FAX 292-'515 Engin..ring Opraratlons July 10, 1992 3377N.RicsSt. Shore-vlew MN/55126 1612) 484-9104 FAX 482-5232 Mr. Raymond Rabbett 0( Property Manager Twin Cities Army Ammunition Plant New Brighton, Minnesota 55112 Dear Mr. Rabbett: In 11ay and June of this yeal-, you and I reviewed and discussed the p"ssibility of utilizing structures or property at t.he TeMP for J:el(.lc-ation of the Ramsey Count.y Public Works Department. 1 wo~ld like to thank you for your time and the alternatives you provided for our consideration. The tour was beneficial in our ~ecision making process and ~ery educational. . One of. the possibilities was to use existing buildings that could b. remodeled for our use. After our review we have determined thal: for teasons of age, design, size, and access, this alternative would not provide for our needs and, therefore, I would not anticipate further consideration. You also mentioned a possibility we do wish to consider, which is the acquisition of vacant land or land which contains a structure that is scheduled for demolition. One such parcel is of particular interest to us, and is one which I would like to pursue to a definite conclusion. That parcel is the approximately 47 acre site pr.eviously used by the Army Reserve north of T.H.96 on the extension of Hamline Avenue. This location is of particular interest because of-its pOSSibility of convenient public access, a defined perimeter road, and the availability because of the recent mOVe of the Reserve. 1 would like to investigate two avenues of acquisition: direct property transfer and/or long term lease. Secause the development costs for a new facility .will be in the range of $7-9 million, we need some assurance the land will be available throughout the life of the development. I have discussed this action with. the Executive Director of Ramsey County who_ has extended his support in this investigative effort. . I:b.. A..:;)'cl"'''''llt ma.:.... '=' .&oy~.n.&M<<llllil .~. lij OCT 21 '92 15:31 P.6 .". , , will you please direct this inquiry to the appropriate people who . will help us complete the acquisition process. r would also be grateful if you could provide me with an outline of the process that must occur to achieve this goal, along with the names of people r or other representatives of ~amsey County could contact to expedite-what you have indicated is a lengthy process. Ramsey County is considering using its current public works site in Shoreview for the construction of a courts facility. Prior to making this decision,. some indication of the TCAAP possibilities is essential. I believe transact'ions such as that proposed' here are in the best interest of TCAAP and Ramsey County. The property use will revert from one public use to another. This type of intergovernmental ~ooperation is what is needed to best serve our customers -- the public. I am looking forward to hearing from you soon. If there is an opportunity to discuss my proposal with other TCAAP personnel prior to your response, I would welcome the chance. Please contact me or my secretary, Marsha Kurka, to arrange a time for such a lr.eeting. SinceI'ely, . ~P4 Paul L. Kirkwold, P.E. Director and County Engineer PK:mk Attachments (location map) cc: Commissioner Duane McCarty, Ramsey County q- 'rerry Schutten, Executive Director, Ramsey County ])( Catherine rago, City of Arden Hills ~ Dwight JOhnson, City of Shoreview I>i / . _ LJ _:.-:-:----OCT 2L '92 . _-::.'----=:--~~-"~,.~~ _._.__15.31 / J\ _:=:- _:~~~~~cj~; ':,~~:::::~:~- ~ - , ~ .,,- .. . '-- _ ._.-.-.... ~J 1'1 ---~- .-. -P' \ . ...:::::::;~" "~':.-. \ 111\ __.. .. -.> c...:;::...__:--:==::::::-'-"--'~----'-" --- ':- :.-:::-".' 1'-::" ~ - ===----===--.--=--=::---- ....' ._ .._....... ,-c= ..... , - ..-.~...,Ii ) "'1' T\..--=J'I'iC - ---'- - - i/ ---- ~ ~ - / " - .-.- .. . ' r / :i DO ~ rr= ~ T~ ____/ .Ii "" I' I . Ii 0 ,I r~ -Ii! ~ ~ II II \" II' I II' 'I 0 L ~ "" I) ~l~ I! I ~ '1 I! {'\ "', 10 Ir-'--==--)' 'I \'. '--' 1'1 _.__ ~ I" .1 .-=- I " III -=~.- --.- I' ' ..' ,._.=A .: I( -..--- I.' ' 0 ----..-. " I: ---. --- .' ." .,-- otl I" ill ,i , " Ii _ Ii . I''--=~ " , "1 ---.:,.... II ':. I ....', I ":' .'1 ,,~. 0 'II .' ,.~' . "\' ii ,('\~""'~'C. ii ';', I' ",:", I': ',>, 'I <>'C \\ d -' ," \\ " ,'. ". I '.;,c--- 'i ) .1 "0. _._____. ,t: // Ii. iLr .. , . " y .. / __.. ..____ '<::::;" ", II' <> >//' . Ii ~~-l ---.."i'-' I Y ," .' _._ , I ' ..... "'\,__ I I' .... --c ---. ":-. \ ,1-.-----"'- [,,- -'- '.::, ~:I ". ----------- I - .'. W"'. __n_ · \" :1' ',\ ----- : ',' ,'.\ --- .' .," 1 ---- " ,. '.'. ,,_n__n I' .1 " ,n__ ,~ 'I' I " ' .. .. " . !' ii 'i.'. I '.' iI ','. I II 'I' " ...,. : : ~', ',:-, I ~ ..~.. " __.' " ,I" " .' /..' ". .,.. '.' ' " ..---------- -' ' , ,~ .. " ) <:-._---:::::::::--...:..--.... \:., il: \\ \" : .",-. ',', :~ ',:, .,'. Ii .:--. i \ "" "'. ' " ..;.'1' -...-~ '.', " - -.' , - -. " ." -'_, Ii -<:-... ":', ", "'C'.. ':" ." II' ..,.. '\ .''''" .:.. ili '--::', ~ ,/-' '.: ,,'. ":', ' " ,,,'" . ' .. .,...... ~ " II .,. .,. .. \\ :1 ''::-. \\ '.\ :' ':-. \:', " " -, " \\ :1 "':" ":', ., Ii "'\'\. ..,'C'~::."""'.~""\"',,,..,. ,,,,,,~..t""""";""5'/ ~ STATE OF RECEIVED NOV 3 1992 lKllKl~~@lT~ DEPARTMENT OF NATURAL RESOURCES . 500 LAFAYETIE ROAD, ST. PAUl, MINNESOTA 55155-4037 OFFICE OF THE DNR INFORMATION COMMISSIONER 16121296'6'57 October 29, 1992 The Honorable Paul Wellstone United states Senator 123 Hart Senate Office Building Washington, D.C. 20510 Subject: TRANSFER OF THE TWIN CITIES ARMY AMMUNITION PLANT (TCAAP) Dear Senator Wellstone: I am writing to you about the possible transfer of the TCAAP property. It is our understanding that the city of Arden Hills has requested that you draft special legislation to transfer portions or all of the TCAAP property to the city. I would like to suggest that we cooperatively explore all state and local interests before you proceed with such legislation. . The Department of Natural Resources has been assisting TCAAP in managing the natural resources of this property since 1967. We have been involved in management of wildlife habitat, including threatened species, fisheries projects, forestry practices, wetland protection, groundwater protection and have also been supportive of TCAAP's efforts in prairie restoration. Portions of this property contain outstanding natural resource values and wise stewardship of those resources is in the public interest. Federal laws and policy mandate that use of surplus federal property be offered first to governmental units representing the citizens of the entire state rather than one portion of the citizens. Such policy should not be altered without careful consideration of the needs and interests of all the citizens and governmental units of the state. This property represents a unique and potentially valuable parcel in the metropolitan area. Careful coordination is needed to ensure that the public receives the minimum risk from environmental contamination sources as well as the maximum beneficial use of this land. . :-', , ,..... - , ! \ J} . .+- L-''--I'-tcl; tL \Jj. I YtJt;;f:A II-C') J)=,-- AN EOUAL OPPORTUNITY EMPLOYER ~ STATE Of RECEiVED NU',' 3 1992 i1'8 i1'8 ~ ~ <Q:> LJ ~ DEPARTMENT OF NATURAL RESOURCES . 500 LAFAYETTE ROAD, ST. PAUL. MINNESOTA 55155-4037 OFFICE OF THE DNR INFORMATION COMMISSIONER (612) 296.6157 October 29, 1992 The Honorable David Durenberger United states Senator 154 Russell Senate Office Building Washington, D.C. 20510 Subject: TRANSFER OF THE TWIN CITIES ARMY AMMUNITION PLANT (TCAAP) , Dear Senator Durenberger: I am writing to you about the possible transfer of the TCAAP property. It is our understanding that the city of Arden Hills has requested that you draft special legislation to transfer portions or all of the TCAAP property to the city. I would like to suggest that we cooperatively explore all state and local interests before you proceed with such legislation. . The Department of Natural Resources has been assisting TCAAP in managing the natural resources of this property since 1967. We have been involved in management of wildlife habitat, including threatened species, fisheries projects, forestry practices, wetland protection, groundwater protection and have also been supportive of TCAAP's efforts in prairie restoration. Portions of this property contain outstanding natural resource values and wise stewardship of those resources is in the public interest. Federal laws and policy mandate that. use of surplus federal property be offered first to governmental units representing the citizens of the entire state rather than one portion of the citizens. Such policy should not be altered without careful consideration of the needs and interests of all the citizens and governmental units of the state. This property represents a unique and potentially valuable parcel in the metropolitan area. Careful coordination is needed to ensure that the public receives the minimum risk from environmental contamination sources as well as the maximum beneficial use of this land. . AN EOUAL OPPORTUNITY EMPLOYER ~ "A" O' RECEIVED NOV 3 1992 ~~[]!~@LJ~ DEPARTMENT OF NATURAL RESOURCES 500 LAFAYETTE ROAD, ST. PAUL, MINNESOTA 55155-403'7 . OFFICE OF THE DNR INFORMATION COMMISSIONER 1612)296.6157 October 29, 1992 The Honorable Bruce Vento United states Congressman Box 100 - Galtier Plaza 175 5th street st. Paul, Minnesota 55101-2901 Subject: TRANSFER OF THE TWIN CITIES ARMY AMMUNITION ~CAAP) Dear e sman Vento: I am writing to you about the possible transfer of the TCAAP property. It is our understanding that the City of Arden Hills has requested that you draft special legislation to transfer portions or all of the TeMP property to the city. I would like to. suggest that we . cooperatively explore all state and local interests before you proceed with such legislation. The Department of Natural Resources has been assisting TCAAP in managing the natural resources of this property since 1967. We have been involved in management of wildlife habitat, including threatened species, fisheries projects, forestry practices, wetland protection, groundwater protection and have also been supportive of TCAAP's efforts in prairie restoration. Portions of this property contain outstanding natural resource values and wise stewardship of those resources is in the public interest. Federal laws and policy mandate. that use of surplus federal property be offered first to governmental units representing the citizens of the entire state rather than one portion of the citizens. Such policy should not be altered without careful consideration of the needs and interests of all the citizens and governmental.. units of the state. This property represents a unique and potentially valuable parcel in the metropolitan area. Careful coordination is needed to ensure that the public receives the minimum risk from environmental contamination sources as well as the maximum beneficial use of this land. . AN EQUAL OPPORTUNITY EMPLOYER Page two The Honorable Paul Wellstone . United states Senator October 29, 1992 We are not opposed to the city's interest in portions of the property but feel that there are more a~propriate avenues, other than special legislation, to cons1der their interests and to reach a consensus as to the highest and best use of these lands. I would sincerely appreciate the opportunity to discuss the needs for cooperation and coordination in the future management of this property. Sincerely, Ifo-/ &.JJr- Rod Sando CODllllissioner Minnesota Department of Natural Resources 102792.10 . cc: Lt. Colonel Joseph Daves, TCAAP Theodore Schulte, Commanding Officer's Rep. Thomas Sather, Ma~or of Arden Hills David Leuthe, Act1ng Regional Adm., DNR, Reg. VI Michele Beeman, Office of the Attorney General . MINUTES CITY OF ARDEN HILLS, MINNESOTA ; WORKSESSION CITY COUNCIL MEETING . , DECEMBER 21,1992 , 4:30 p.m. . CITY HALL CALL TO ORDER/ROLL CALL Pursuant to due call and notice thereof, Mayor Sather called to order the Worksession City Council meeting at 4:30 p.m. Present: Mayor Sather (arrived at 5:30 p.m.), Councilmembers Paul Malone, Dale Hicks, and Councilmember-Elect Beverly Aplikowski. Absent: Councilmembers JoAnn Growe and Thomas Mahowald. Also present were: Clerk Administrator, Dorothy Person; Public Works Superintendent, Dan Winkel; City Accountant, Terry Post; Engineers, Terry Maurer and Mark Graham; and Citizen's Committee members Jean Lemberg and Ray McGraw. Due to the lack of a quorum initially, general review was made of the Pavement Management Program, Storm Water Utility, and T.H. 51. Malone asked the Engineer to review Floral Avenue which contains cracks in the surface. The question was if it is a bigger problem, i.e.; a base soil problem. Terry Maurer will review the situation. Keithson Road residents have asked about the current temporary patching and what long-term plans are being made to address the issue of the road. The Engineer . indicated that the current patching is only a temporary solution and there would be some review of the road base and review the possibility of sealcoating in the future. He indicated further that he and Public Works Superintendent Winkel indicated that compaction is in the area of the utility lines probably due to recent years of a dry spell. The road surface is 5 years old. In Spring, 1993, the Engineer will be reassessing this issue. Storm Water Utility was reported to be worked on. The Engineer indicated that he and the City Attorney are concerned that public information be given prior to any finalizing of a plan. He suggested that information be brought to the January 4, 1993, organizational Council meeting with a tentative hearing in March. MOTION: At the January 25 meeting, the City Engineer will present a draft of the Storm Water Utility with information to be reviewed by City Council anticipating information in the February Newsletter and potentially setting a public hearing in March with possible implementation at beginning of the 2nd quarter in 1993. T.H. 51 - The four options presented by the County were previously reviewed. The Engineers reported that the frontage is the most expensive and possibly not an option due to the wetlands that would need to be crossed. The Engineer had looked at the lighting of the intersection of T.H. 51 and Old Snelling as the most reasonable . alternative. He indicated that MnDOT would be providing 50 percent of the funding with the County and the City providing one-fourth of the funding each unless more issues addressed such as Glenhill Road being connected. MINUTES. WORKSESSION CITY COUNCIL MEETING DECEMBER 21, 1992 PAGE TWO , , . Further discussion took place regarding the impact of this road and the turnback system. Ray McGraw indicated that as an alternative such as a viaduct or overpass be considered. Jean Lemberg and Ray McGraw indicated that the citizens in the area primarily affected during rush hours and that any study on County Road E changes and flow of traffic and volume of traffic should include these time periods. The Engineer will get further information from MnDOT as to the length of time and time of day that the study took place. He indicated that normally the County review is made during a 24.48 hour period. The Engineer also indicated the City will want a Feasibility Study if the Council decides this is the best route. It was suggested that an Informational Meeting be held with the public to get further input and opinions from additional members of the public. The Public President requested that MnDOT's perspective be reviewed in a public meeting with a representative such as Tom O'Keefe and that further information be received from the City Engineer regarding other alternatives. (Mayor Tom Sather joined the meeting at this time - 5:30 p.m.) Further information was discussed regarding the possibility of holding a public meeting on the TH. 51 and Old Snelling crossing. Determination was made that at the January 25 meeting, the City will be prepared to discuss the alternatives. At the December 28 meeting, the City Engineer will request the City to authorize a feasibility study be completed based on the review at the Worksession with recommendations. . The Council identified at the January 25 meeting to review and debate the merits of options at this intersection. At that time, the Council will decide with proceeding with one of the options for further input from the Engineer or they will decide to request from the public at a further date. MOTION: Malone moved, seconded by Hicks, that the City recognize the Pavement Management Plan and request a Feasibility Study during the Monday, December 28 meeting. It was requested that the City Engineer, in January, discuss further the timing of a Storm Water Utility and information for a public meeting to be held in early March. And, at the January 25 meeting, have a public meeting to discuss TH. 51 and Old Snelling public informational meeting regarding options and to request input from the public regarding impact of any of the options and to provide an opportunity to introduce further options. At this time, the Council requested additional information prior to any decision being made regarding whether to proceed and. if so, which alternative to investigate further. The Council agreed that a letter to the School District be written to request their input on any impact on signing of the TH. 51 and Snelling Avenue. . MINUTES. WORKSESSION CITY COUNCIL MEETING DECEMBER 21, 1992 PAGF,. THREE . Discussion followed regarding City Hall and Public Works Facilities options. Options discussed included location site, financing alternatives, and content and design of needs. Mayor Sather indicated he would be reluctant to cash out the PIR Fund through internal payback system in order to provide further financial strength for the City. Malone indicated if PIR Funds are not used, an outside agency may be willing to lease back to the City. City Accountant Post indicated to the Council that on a lease option as a funding mechanism, the cost to the City residents is lower than through a general obligation cost. Further discussion was held regarding the site and contents of the program. The December 21 memorandum from the Architect was reviewed with the Council and the Citizen's Committee agreeing that the program that had been designed for the City Hall and Public Works Facility should continue. Hicks requested further information regarding whether the City owns the building if a lease is pursued and the TCAAP site whether there is a possibility of a lease or with a purchase to be done before the referendum is pursued as an option. Mayor Sather indicated that any lease on the TCAAP property would be a lease purchase program and that TCAAP has indicated they will be agreeing with the concept. The Mayor anticipates that this spring (1993), we will be more certain of the location and that discussions are proceeding in a positive . fashion at this time. The Architect, Jeff Ortel, indicated there are different options for cutting back on the programming space. It was also included in several questions from the community whether a metal building would be sufficient for the Public Works Building rather than precast concrete as is currently anticipated. He indicated that he has proceeded with a metal building. However, there have been negative issues of dents in the wall, being able to hang products and equipment on the wall in a metal building versus a precast concrete building which is more stable building used for those purposes. The Citizen's Committee indicated they have received calls that there is too much cost in , the building per square footage. He indicated that it was not communicated clearly that included in that were site preparation road costs and utilities. Ray McGraw indicated he would prefer to see a second referendum. He believes, generally, in the country there is a more positive outlook. He also indicated that the uncertainty of a location, he has been told, has been a negative factor in the vote of individuals. He stated that several citizens advised him further work be done with Federal officials and other citizens who would know the Federal system. Mayor Sather indicated that several contacts have been made to rekindle relationships with Federal authorities and other local governmental agencies. He indicated that Commissioner of DNR, Rod Sando, has been contacted and has a more clear . understanding of the intent of the northern portion of the TCAAP property from Hamline and Lexington Avenue - it is not intended by the City to be used for their own purposes. However, to hold it open for other issues not related to development of the land for the City's facilities. - , ------ MINUTES - WORKSESSION CITY COUNCIL MEETING DECEMBER 21, 1992 PAGE FOUR \ . Citizen's Committee Members Charlotte McNiesh and Beverly Aplikowski also indicated that they believe the second referendum should be pursued and that the site should be more firm before going to referendum and that the original design should continue to be pursued. The Mayor agreed to followup in early January with further discussion regarding the TCAAP property as a primary option for the location of the City facilities and will report back with springtime for a target date for finalization of the decision regarding City facilities. Review was made of the citizen committee appointments for 1993. The Council indicated that a newspaper ad should be placed. specifically, for the openings in the Human Rights Committee, and any other interested parties for other citizen appointments to other committees. Discussion followed regarding the replacement of Councilmember JoAnn Growe. The Council indicated declaration of a vacancy should be on the Consent Calendar for the December 28 Council meeting. An announcement in the local newspaper should be made with applications to come in at the end of January, and requested Council review at the Worksession meeting of February 8 be held with an appointment by March 1 as a deadline for the Councilmember vacancy. . Discussion was held on the Recreational Vehicle amendments to the Zoning Code. The Planning Commission was asked to hold a public informational meeting as they see fit for the Recreational Vehicle amendments with a deadline for Council review as soon as possible. Public hearings may be held if further changes are necessary. Council Comments. Hicks will not be attending the January 11 and February 22 Council meetings. ADJOURN MOTION: Hicks moved, seconded by Malone, to adjourn the meeting at 7:00 p.m. Motion carried unanimously. (3-0). Dorothy A. Person, City Administrator . . , . MINUTES CITY OF ARDEN HILLS. MINNESOTA REGULAR CITY COUNCIL MEETING December 14. 1992 7:30 P.M. - City Hall CALL TO ORDE~/ROLL CALL Pursuant to due call and notice thereof, Mayor Sather called to order the regular City Council meeting at 7:30 p.m. Present: Mayor Thomas Sather; Councilmembers JoAnn Growe, Dale Hicks, Thomas Mahowald, Paul Malone. Also present were: Councilmember-Elect. Beverly Aplikowski; City Planner, John Bergly; Clerk Administrator, Dorothy Person; Deputy Clerk/Zoning Administrator, Catherine Iago; City Accountant, Terry Post; Recording Secretary, Shar Foster. ADOPT AGENDA Note was made that the original December 14 Council agenda . was revised by staff. MOTION: Malone moved, seconded by Hicks. to adopt the revised December 14, 1992 agenda. Motion carried unanimously (5-0). APPROVAL OF COUNCIL MINUTES Councilmember Hicks requested the first sentence of Page 6 of the November 30, 1992 Council meeting minutes be revised to read .. the City has control over the alternatives, it is up to the City to decide " in place of .. the City has little control over the alternatives, but it is up to the City to decide .. Council agreed to this revision. MOTION: Hicks moved, seconded by Mahowald, to approve the minutes of the November 30, 1992 Regular Council Meeting with one revision to page six noted above. Motion carried unanimously (5-0). INTRODUCTION OF SPECIAL GUESTS Mayor Sather acknowledged the presence of several Boy Scouts in the audience and their Leader, Mark Wilberts. Sather announced these Scouts from Pack 408 Den 2 have toured the . Public Works/Parks fac:lity and are attending the meeting as part of their community service badge award. Council welcomed the Boy Scouts. , , . Arden Hills Council 2 December 14, 1992 CONSENT CALENDAR MOTION: Malone moved, seconded by Growe, to approve the Consent Calendar and authorize execution of all necessary documents contained therein. Motion carried unanimously (5-0) . a. Adopt Resolution No. 92-74 Relating to Apportionment of Assessments Relating to Improvement No. ST-81-2. b. Approve Pay Estimate #2 for 1992 Keithson Pond Improvements. c. Approve Purchase from 1992 Budget - Computer PC Workstation. d. Receive November 1992 Financial statement. e. Approve 1993 Liquor License Renewals. f. Approve Request for Funds - state Aid Allotment. g. Approve Authorization of Contract with Abdo, Abdo & Eick as 1993 City Auditor. h. Approve the Award of Quotes - Rodder Equipment and l-Ton Truck Equipment (Plow and Sander) to Flexible Pipe Tool Co. for $19,890.00. i. Approve List of Claims/Payroll. . PUBLIC COMMENTS ALTERNATIVES FOR T.H. 51/SNELLING Jean Lemberg, l401 Skiles Lane, commented that she has learned there has been some public expression of opposition to one of the alternatives for opening the T.H. 5l/Snelling intersection. She said she is aware of many residents who support the opening of the intersection with signalization but have not written letters expressing their support; she asked if Council would like to receive letters from those supporters. Administrator Person reported that recently three letters regarding this issue. Councilmember Hicks commented that he would be interested in knowing the desires of the residents in the area. Councilmember Malone reminded that in earlier discussions of this issue, both sides were represented, so Council is aware that there is not unanimous agreement on this issue. Malone added that when he reviews letters from the public, he views such letters as indicative of the position of the writer{ s) only, regardless of whether the letter may state that the view expressed reflects the view of an entire neighborhood or group. . . Arden Hills Council 3 December 14, 1992 UNFINISHED AND NEW BUSINESS CASE #92-21 - MINOR SUBDIVISION/LOY CONSOLIDATION ~ONTROL DATA SYSTEMS City Planner Bergly explained that Control Data Systems is requesting approval to consolidate parcels which they own and then subdivide the consolidated property into three parcels. He outlined the boundaries of the subject parcel, and boundaries and ownership of adjacent properties. Bergly stated that the lot consolidation/minor subdivision would create parcels A, B, and C. He added that parcel A is the NSP substation, parcel B would be the combination of two parcels into a long, rectangular developable lot (for which there is already a buyer), and parcel C would be an L-shaped parcel which contains the north wing of the control Data Systems building. Bergly stated that the Planning Commission has recommended . approval subject to the applicant dedicating rights-of-way where there are currently easements for abutting streets. He pointed out the location of utility and drainage easements and stated these easements have all been approved by the City Engineer. Bergly said recent State legislation, administered by watershed districts, requires that wetlands be defined, so Rice Creek Watershed District must review and approve wetland easements. He added that the surveyor has revised the subdivision plan and descriptions and has incl uded all the easements as recommended by the Planning Commission, and those changes are included in the plans shown tonight. Bergly explained that conveyance of property is intended and it is recommended by the Planning Commission that the applicant be allowed to submit this to the County for filing as a minor subdivision rather than a plat. Bergly advised that the Planning Commission and staff are recommending approval of Case #92-21 with the following conditions: 1 ) Parcels A, B, and C shall not include the rights-of-way of abutting streets either in the delineation on the subdivision plan or in the legal descriptions, 2) The City Engineer and Attorney review and approve the plan and any conveyance or easement documents prior to filing, 3) Rice Creek Watershed District review and approve wetland . f:.'~s~-:nents , and 4) Park dedication be resolved prior to development of the property. . Arden Hills Council 4 December l4, 1992 Councilmember Malone commented that the City obtains access to park property via a portion of this property; he asked what kind of agreement is in place to allow this access. Jim Bellandi, Attorney for Control Data Systems, explained there was a lease allowing access which has expired. Bellandi stated that he has discussed this matter with City Attorney Filla and the intent is to rewrite the expired 1 eas e to continue to allow City access; he added this is not a controversial issue. councilmember Malone asked if this property is located in an I-I zone; Bergly answered that it is in an I-l zone and he has been assured that the future intended use is appropriate in the I-I zoning district. MOTION: Hicks moved, seconded by Malone, to approve Case #92- 21, Minor Subdivision/Lot Consolidation (in the revised form viewed this evening) for Control Data Systems with the c ondi ti ons that: l) The City Attorney review and approve the plan and any conveyance or easement documents, 2) Rice Creek Watershed District review and approve wetland easements, . 3) Park dedication be resolved prior to development of the property, 4) utility and drainage easements be provided per the City Planner's recommendations and the Engineer's letter of approval. Motion carried unanimously (5-0). REVIEW AND APPROVAL OF 1993 BUSINESS LICENSE AND PERMIT FEE STRUCTURE Administrator Person recalled that at the November 30 Council meeting the Council received recommendations from the Finance Committee regarding changes in license and permit fees. Referring to her December 10 report, she reported that staff has reviewed the recommendations of the Finance Committee and concurs with recommendations to change the following license and permit fees: 1) Increase in sign license fees: Ini tial permit fee - from $25 to $50 for 1993. Annual sign license fee - lOO sq. ft. or less from $10 to $20; 10l sq. ft to 400 sq. ft. from $2/additional to $4/additional; over 400 sq. ft. from $2.50/additional to $5/additional. 2 ) Increase the drive-through restaurant fee from $250 to . $300. 3) Increase retail sales license fees from $40 to $50. 4 ) Delete the Rendering plant license fee (obsolete). 5 ) Change the following permit structure: ------- . Arden Hills Council 5 December l4, 1992 - Sewer permit - from $15 to $35. - Water permit - frem $l5 to $35; installation from $15/hour to $30/hour. - Plumbing permit - from $15.50 minimum plus $5 for each additional fixture to $15.50 for the first fixture and $7.50 for each additional fixture. Person advised that staff has identified the following related items which Council may wish to reV1ew and discuss at a future worksession: - Definition of amusement devices and cigarette machines. - Fire inspection for special events, alarm system installation, building inspection fees, and liquor license and investigative fees. - Institution of City SAC and WAC charges per unit for new construction. - Dog license fee increase. - Possible redefinition of drive-through restaurants to be treated the same as other restaurants and change basis of fee from square footage to hours of operation. - Garage/boutique sales fees. . - Possible change of retail sales license to general business license fee and change basis of fee from square footage to hours of operation. MOTION: Mahowald moved, seconded by Hicks, to approve the license and permit fee changes numbered 1) through 5) above. Motion carried unanimously (5-0). APPROVE CAPITAL EOUIPMENT & AUTHORIZE CITY ADMINISTRATOR TO SIGN PROPOSALS FOR DATA PROCESStNG PURCHASES Administrator Person stated that some time ago the City reviewed the possibility of performing data processes in- house rather than through an off-site data processing service in an effort to provide enhanced and more cost- effective service. City Accountant Post recalled that in budget worksession the matter of in-house versus off-site data processing was discussed. He stated that a determination has been made that there would be a long-term cost savings by performing data processing functions in-house. He added that implementation would require the purchase of necessary hardware and components, and it is anticipated that very moderate additional staffing would be required for . con"ersion, after which existing staff would perform the work. Person reported that three vendors have submitted quotes for the necessary hardware and components, and staff is ------------------ . Arden Hills Council 6 December l4, 1992 requesting authorization to purchase the necessary equipment at the lowest bid for each item. Councilmember Malone asked what would be the cost of data conversion to an in-house system. Post answered that conversion is expected to cost about $500. Councilmember Hicks asked what is the anticipated cost savings. Post stated that after the initial conversion costs, it is expected there would be approximately $15,000 annual savings from not having to pay the outside data processing service which would be realized in l-l/2 to 2 years. Hicks noted that individual items are being recommended for purchase from a variety of vendors; he asked if all items would be compatible. Post replied that the items are all compatible, and the reason for the various vendors is simply to receive the best prices. Councilmember Mahowald asked if the hardware may provide future ability to enhance other processes performed by the City. Post said the equipment would create a network, which would be an additional side benefit. MOTION: Malone moved, seconded by Growe, to authorize the City . Administrator to sign appropriate purchase agreements with the following vendors for data processing hardware and components from the 1993 budget. - Banyon Data Systems: Workstation, server, network accessories, installation and annual support $l2.744.32 - DCT Systems Group: tape backup unit $ 1,805.18 - Banyon Data Systems: Software purchases for fund accounting, payroll and uti! i ty billings, training and annual support $lO,130.03 Total $24,679.53 Motion carried unanimously (5-0). DISCUSSION OF OFFER FOR BRUEBERRY LOT As background, Administrator Person recalled that the City 1) Received a request from Edgewater Estates Partner-ship, Inc. to consider selling the lot at the northwest corner of Brueberry Lane and Old Highway 10, ~) Counci 1 advertised the L . property for sale and received no bids from other interested buyers, and 3) Negotiations continued with Edgewater Estates Partnership to arrive at an agreeable price. . Arden Hills Council 7 December l4, 1992 Person reported that the final resul t of negotiation is an off er from Edgewater for a purchase price of $28,500 with the condition that the City incur the cost of removing the existing lift station from the subject property. she added that a 1991 appraisal of the property was $26,000 with the lift station removed. Person noted the advantage of selling the lot would be that the buyer has a good development record with the City and intends to develop the lot consistent with adjacent townhomes development. She stated the possible disadvantage is that removing the lift station may have complications which could result in higher than expected costs to the City. Councilmember Malone commented that the subject property appears to be landlocked and its intended use by Edgewater appears to be the only reasonable use of the land. He added that since there has been no interest expressed by any other buyer, he would be inclined to finalize negotiations with Edgewater. . Councilmember Mahowald commented that in reviewing information as to comparable sales, it appears Edgewater's offer is fair and would allow for the best use of the property. He favored proceeding with the sale as negotiated. Councilmember Hicks commented that Edgewater's offer is $28,500 with no park dedication, and costs for removal of the lift station are to be incurred by the City. He said that in this easel park dedication may not be an important consideration! but he would prefer to sell the property for $25,000 as is I making the buyer responsible to remove the lift station. Person said that arrangement was considered, but the 1991 appraisal of $26,000 assumed the removal of the 1 ift station. Councilmember Growe said this does not appear to be a prime lot and she would be inclined to accept Edgewater's offer. Mayor Sather commented that taxpayers would be better served by selling the property and having it become taxable. He added that continuity of development would also be a plus. . . Arden Hills Council 8 December 14, 1992 Councilmember Hicks asked what the developer is planning to build on the lot. Planner Bergly said he has not seen a proposal, but per code there could be two units. Zoning Administrator Iago reported she has seen a preliminary proposal calling for two units, which is consistent with existing development and consistent with the proposed new zoning ordinance. MOTION: Malone moved, seconded by Growe, to authorize the City Administrator to finalize negotiations with Edgewater Estates Partnership, Inc. for the sale of the lot at the northwest corner of Brueberry Lane and Old Highway 10 for a price of $28,500 with the condition that the City remove the existing lift station from the property and waive park dedication requirements. Motion carried (4-1, Councilmember Hicks voted nay). COUNCIL ,COMMENTS SIGN ORDINP.NCE Councilmember Malone thanked staff for the memorandum outlining revisions to the proposed sign ordinance. . FIRE MARSHALL Councilmember Malone commented that after reviewing information, he is not convinced of justification for a Fire Marshall and would like to see more background and information on this matter. COUNCILMEMBER MAHOWALD'S FAREWELL Councilmember Mahowald advised that this would be his last meeting as he will be unable to attend the last December Council meeting. He thanked the citizens of Arden Hills for the opportunity to serve as Councilmember, said he hopes residents realize what a good Council and staff serves the community, and stated that he is confident Councilmember- Elect Aplikowski will do a fine job as Councilmember. Mayor Sather thanked Councilmember Mahowald for his valuable service to the City and his friendship to the Council and staff. He stated that Councilmember Mahowald has been very unselfish with the giving of his time at the expense of his family. and he wished him the best. ~~UNCI1M~MEER GROW~'S R~SIGNATIQN . /-layor Sather said he has learned that Councilmember Growe has submitted her resignation effective January l, 1993. He said the Council is sorry to lose councilmember Growe as she . Arden Hills Council 9 December 14, 1992 has brought an added sensitivity to the Council. He asked that discussion of the matter of replacement options be placed on the upcoming worksession agenda. ADJOURN MOTION: Growe moved, seconded by Malone, to adjourn the meeting at 8:14 p.m. Motion carried unanimously (5-0). Thomas R. Sather, Mayor Dorothy A. Person, Clerk Administrator NOTICE OF MEETINGS: The next Council worksession will be December 21, 1992 at 4:30 p.m. The next regular Council meeting will be held December 28, 1992 at 7:30 p.m. at City Hall. . . ~ CITY OF ARDEN HILLS . RAMSEY COUNTY, MINNESOTA RESOLUTION NO. 92-75 RESOLUTION ESTABLISHING LICENSE AND PERMIT FEES AND LIABILITY INSURANCE REQUIREMENTS WHEREAS, section 13-24 of the Arden Hills Code provides that permit/license fees and insurance requirements be established from time to time by resolution adopted by the City Council, and; WHEREAS, the Finance Committee, after careful consideration, has recommended changes in the present fee schedule, and; WHEREAS, the Council has reviewed the Finance Committee recommendations and determined that sign license fees, drive-thru restaurant fee, retail sales license fee should be increased, Render Plant license fee be deleted, and utility permit fees be included in resolution; NOW, THEREFORE, BE IT RESOLVED, that the following fees and liability insurance requirements are hereby established: Alcoholic Beveraqes . On Sale (Bond - $5.000\ 1,999 sq. ft. or less $3,300 2,000 to 2,999 sq. ft. 4,400 3,000 to 3,999 sq. ft. 5,500 4,000 sq. ft. or more 6,600 Sunday 200 Off Sale (Bond - $3,000) 150 Club 300 Investiqative Fee Liquor License Applicants 100 Charitable Gambling Applicants 100 Wine (On sale) - 1/2 of On Sale Liquor License Fee or 2,000 whichever is less. Malt Beveraqes On Sale 120 Off Sale 40 Amusement Facility 100 Includes arcade, dance hall, movie theater, pool/billiard tables, indoor tennis, skating . facility, outdoor tennis, driving range, etc. Mechanical/Electronic Recreation Devices . Includes mechanical amusement devices, mechanical musical devices, mechanical amusement ride, bowling alleys, etc. 1 device 50 2 to 4 devices 100 5 to 10 devices 275 11 to 15 devices 605 Over 15 900 **Retail Sales $ 50 Includes antique shops, boat dealers, Christmas tree sales, dry cleaning, laundry, bakery, candy, meats, wholesale food, caterers, motor vehicle sales, optometrist, mortuary, video sales and rental, "selling retail goods or services not otherwise listed." Rental Eauipment $ 75 Includes requirement of liability insurance. Includes motor vehicles, bicycles, trailers, misc. goods and equipment. Bulk Fuel Storaae $ 200 (Wholesale) Includes requirement of liability insurance. . Ciaarette Vendina Machines $ 25 Contractors (Liability Insurance Required) Garbage, refuse collectors $ 60 Heating/AirConditioning/Gas Installer 30 Excavators 30 General Contractors 30 Doas (Rabies certificate required) Even year license, (2 years) 10 Odd year license, (1 year) 5 Duplicate Dog Licenses 2 Grocerv Per 1,000 sq. ft. or fraction 20 Restaurants. Cafes, Etc. Per 1,000 sq. ft. or fraction 20 **Drive Thru Restaurant 300 Hotel/Motel $6/room Massaae Parlor/Sauna $3,000 Personal Service License 100 . . service station (Liability insurance required) 100 . **Sions (Fee listed is per sign) Initial Permit Fee $ 50 Annual License Fee 100 sq. ft. or less 20 101 to 400 sq. ft. 24 Over 400 sq. ft. 25 In addition to fee add $.50 state surcharge **utilitv Permits Sewer permit $ 35 Water permit $ 35 (Includes outside inspection, new inside inspection, changeover from well) 3/4" meter + $20.00 valves 70 1 inch meter + 25.00 valves 115 1 1/2 inch meter + 30.00 valves 300 2 inch meter + 35.00 valves 415 Installation $ 30/hour Plumbing permit (first fixture) $ 15 each additional fixture $ 7.50 In addition to each of the above permit fees, add $.50 state surcharge . REOUIRED LIMITS FOR CERTIFICATES OF INSURANCE 1. Comprehensive General Liabilitv A. Bodily injuries, including death resulting therefrom sustained by anyone person - $100,000, and $300,000 per anyone occurrence, or combined single limit of $300,000 for bodily injury and property damage. B. Property damage liability - $100,000 per occurrence. C. xcu (Excavation, Collapse, Underground) Exclusion deleted where permittee or licensees work involves risks or exposure. 2. Comprehensive Auto Liabilitv A. Bodily injuries, including death resulting therefrom sustained by anyone person - $100,000 and $300,000 per anyone occurrence, or combined single limit of $300,000 for bodily injury and property damage. B. Property Damage Liability $100,000 per anyone occurrence. C. Hire car and non-ownership coverage. . . .' . 3. Worker's Compensation . A. coverage as required by section 176.181, Subd. 2, of the Minnesota Statutes. BE IT FURTHER RESOLVED, that the above fees and insurance requirements shall be effective January 1, 1993. Passed by the Arden Hills City Council this 28th day of December, 1992. Thomas R. sather, Mayor ATTEST Dorothy A. Person city Administrator . (Revised Resolution 90-12) . , I CONSULTING ENGINEERS . Maier Stewart & Associates Inc. December 18, 1992 File: 520-040-10 Ms. Dorothy Person City Administrator City of Arden Hills 1450 West Highway 96 Arden Hills, MN 55112 RE: 1993 PAVEMENT MAINTENANCE IMPROVEMENTS Dear Ms. Person: Discussion of this proposed project will be held at the December 21, 1992, work session. Following this meeting, we recommend that the attached resolution be considered at the . December 28, 1992, City Council meeting. This resolution, required by State Statute Chapter 49, orders a feasibility study for the proposed improvements. We will complete the feasibility, if ordered on December 28, for the January 25, 1992, City Council meeting. Please contact me if you have any questions. Sincerely, MAIER STEWART & ASSOCIATES, me. A(adsfl~ Mark 1. Graham, P.E. MlG:tp Attachment 040-2102.dec . 1959 SLOAN PLACE. SUITE 200. ST. PAUL. MINNESOTA 55117 612-774-6021 9600 SHELARD PARKWAY. SUITE 102. MINNEAPOLIS. MINNESOTA 55441 612-546-0432 . Equal Opportunity Employer . . CITY OF ARDEN HILLS RAMSEY COUNTY, MINNESOTA RESOLUTION 92 - 76 A RESOLUTION OF THE CITY OF ARDEN HILLS ORDERING A PRELIMINARY FEASIBILITY REPORT IN THE MATIER OF THE 1993 PAVEMENT MANAGEMENT IMPROVEMENT WHEREAS the City has determined that it should consider improving certain property by reviewing a 1993 Pavement Management Improvement; and WHEREAS Council must first secure a preliminary feasibility study in order to consider making the improvement; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Arden Hills, Minnesota: . This matter shall be referred to Maier Stewart & Associates, Inc. who is requested to provide to the City Council a report advising, in a preliminary way, whether the proposed improvement is feasible and whether the improvement should thus be made as proposed or in connection with some other improvement and the estimated cost of the improvement as recommended. Passed and adopted this 28th day of December, 1992. Mr. Thomas R. Sather, Mayor A TrEST: . Ms. Dorothy Person, City Administrator CONSULTING ENGINEERS . Maier Stewart & Associates Inc. MEMO TO: City Council for December 21. 1992 Work Session FROM: Mark Graham, Maier Stewart & Associates, Inc. DATE: December 16, 1992 RE: Possible 1993 Street Maintenance Improvements FILE NO: 520-040-10 All streets were re-rated by members of the Public Works Staff this fall. Information was input into the City's Pavement Management Computer Program and lists were generated for streets requiring seal coating, overlaying or reconstruction. The computer ratings and field comments were used to formulate these recommendations. In addition, performing the same type of maintenance on streets within the same area generally allows lower bid prices, since the Contractor minimizes his travel time. Following are lists that Public Works Supervisor Winkel and I developed based on the ratings, field comments and group location of streets. We have shown the ratings and estimated construction costs. . For overlay improvements in residential areas, the City assessment policy allows for assessment of 50% of the total project cost to abutting homeowners. The assessment rate in 1991 was $2.82 per front foot. We would anticipate a 1993 rate of $3.00 to $3.25. For seal coating improvements, it has been City policy to not assess abutting property owners. We would not recommend a change in 1993 to this policy. . . ' . Tl1~') .JI-.,:t .. ..... .~ .. T'Tr .~~""r"'" ,...._"'''''. ......_~:.~...-r..;,'...:.... r-'ip~'-'v~."- ..-:~ fZt4..... cor. 'I'" 1 uug,e t::(J.- d.tr..ViJ,U,..'!;. J. .1. ~ '7.) ,.JIU........L IVla...iia~ a:uV;:; ~'!l._ HJ- cl:~:::'n:'~ 1:' .....1 t:.J~ ,,,,'v. PROPOSED 1.5" BITUMINOUS OVERLAY IMPROVEMENTS Street From To Rating Est. Cost Karth Lake Circle Hamline Avenue 2nd Cul-de-sac 59 $ 24,000 Nursery Hill Lane N ursery Hill Ct. 400' North 73 $ 32,000 Nursery Hill Court Nursery Hill Lane Cul-de-sac 73 $ 19,000 Amble Road Hamline Avenue Dead End 43 $ 21,600 Briarknoll Circle Snelling A venue Cul-de-sac 23 $ 18,500 . 1959 SLOAN PLACE. SUITE 200. ST. PAUL. MINNESOTA 55117 612-774-6021 9800 SHELARD PARKWAY, SUITE 102. MINNEAPOLIS. MINNESOTA 55441 612.546-0432 . Equal Opportunity Employer , , Briarknoll Drive Norma A venue Briarknoll Cir. 35 $ 29,900 . Norma Avenue Briarknoll Dr. 500' South 56 $ 9,800 Gale Circle W. Floral Dr. Cul-de-sac 44 $ 11,100 James Circle W. Floral Dr. Cul-de-sac 48 $ 17,100 Dellwood Ave. Nursery Hill Ct. Amble Road 60 $ 14.000 Total $197,200 Less Anticipated Assessments $ 47.000 Estimated Cost $150,200 Weanticip!!.te th3.t the bidcing pr6ce.s would l'edul.e these ..:usts. We recommend 'bidding this group, and, if necessary, eliminating Nursery Hill Court, Nursery Hill Lane and Dellwood A venue to remain within the budget. By eliminating these streets, the estimated cost would be reduced to $99,000. It is far prefarable to plan and notify residents of a potential assessment, then delete the work, than it is to receive favorable bids and then add streets, which would require additional public hearings. PROPOSED SEAL COAT IMPROVEMENTS ~ .Emm To Rating Est. Cost . Red Fox Road Frontage Road Lexington Ave. 51 $ 10,800 Pine Tree Drive Harriet A venue. Co. Road E 74 $ 4,800 Northwood Drive Red Fox Road Dead End 87 $ 2,900 Femwood Court Ingerson Road Cul-de-sac 86 $ 1,400 Ingerson Court Ingerson Road Dead End 93 $ 1,500 Edgewater Avenue Lexington Ave. Dead End 97 $ 2 .500 Estimated Cost $ 23,900 A separate issue also to be considered is patching and overlay on Kiethson Drive. Public Works Supervisor Dan Winkel anticipates a cost of $7,500 to $10,000. This would directly affect the scope of the overlay and seal coat improvements. We recommend that a feasibility study be ordered at the December 28, 1992 Council meeting, for the 1993 Maintenance Improvements. This will allow for the necessary public hearings prior to the 1993 construction season. MJG:db mcmo-04O.dec .