Loading...
HomeMy WebLinkAboutCCP 01-20-1993 ~ . ARDEN HILLS CITY COUNCIL WORKSESSION MEETING COUNCIL CHAMBERS WEDNESDAY, JANUARY 20, 1993, 4:30 P.M. 4:30 PM 1. . CALL TO ORDERIROLL CALL. , 2. AGENDA ADOPTION. 3. TIF PROJECT - FUNDING DISCUSSIONS. (THIS ITEM HAS BEEN POSTPONED FOR FURTHER DISCUSSION. REQUEST COUNCIL MEET AT 6;00 P.M. ON 1125193 TO REVIEW THIS ITEM). 4. REQUEST TO REVIEW ROUND LAKE DEVELOPMENT, PROPOSED USE - THE EVEREST GROUP. (THIS ITEM HAS BEEN POSTPONED FOR FURTHER DISCUSSION. TENTATIVELY SCHEDULED FOR 5:30 P.M. ON 1125/93). 4:30 PM 5. CITY ENGINEER DISCUSSION OF: A) PAVEMENT MANAGEMENT STUDY . B) T.R. 51 AND SNELLING AVENUE UPDATE. C) STORM WATER UTILITY UPDATE. 5:00 PM 6. ADMINISTRATOR REPORT - ORGANIZATIONAL REVIEW AND CITY NEEDS. . 5;30 PM 7. SIDEWALK SNOW REMOVAL POLICY REVIEW. 5:45 PM 8. RENTAL OF CITY HALL. 6;00 PM 9. UPDATE OF ARDEN HILLS 2000/1994 BUDGETING PROCESS. 6: 15 PM 10. COUNCIL COMMENTS. 6:30 PM 11. ADJOURN. . . The above times may be subject to discussion of the issue. . w . CITY OF 1\RDEN HILIS MmalANIXIM ro: Mayor and city CO\mCil F.Il(H: Dorothy A. Person, city :Administrator W MTE: January 15, 1993 , SUBJECT: city JIdm;n;strator's Info~tion For CO\mCil Worksession MeetiIYJ of 1/20/93 I. ACl'ION NEEDED BY CITY <X>UNCIL: No.3. regarding TIF Project - F\lnding Discussions. This item has been postponed for further discussion. Request Council meet at 6:00 p.m. on 1/25/92 to review this itein. No.7. regarding sidewalk Snow Removal Policy Review. Following the Friday snowfall several weeks ago, it has been requested by several residents that the City clear the sidewalk on the Arden Hills side of Lexington Avenue. since the City does not have the equipment available to properly clean sidewalks, the City of Shoreview was contacted to assist in this matter on a short- tenn basis. However, the City of Arden Hills reJOClVed the snow. . FUrther discussion will be requested during the Worksession regarding whether the Arden Hills City Council wishes to limit the service of cleaning sidewalks to the east side of Lexington or whether further sidewalks will be cleaned or no cleaning at all. This is in anticipation of additional residents requesting this service. There will be potential costs of this service available at that time f= your review and detennination. No.8. regarding Rental of City Hall. From time to time, requests are made for use of the city Hall for different reasons. These requests have been withdrawn for lack of privacy, lack of space, lighting, etc. The staff reviewed comparable spaces and potential costs to the city. As you are aware, one of the major issues is when others come into City Hall during other than hlsiness hours, security is a risk due to the numbers files that cannot be locked away. Another option would be to hire an outside security company or to use internal staff. If current enployees were used, the. cost to the City would rarx:Ie from $10-27/hour. The City may choose to pursue some rei.mJ::urseJnent from the city fl.U1ds. This would reduce cost to the renter, however, the taxpayer assumes some of these costs. It must be noted that many of these requests are not requested by city taxpayers. . t . city 1ldmi.nistrator's Infoonation For COUncil WOrksession MeetiDJ of 1/20/93 Page 'lWo No.9. regarding the Update of Arden Hills 2000(1994 Budgeting Process. 1) 1993 Budget doa.nnent is in prcx::ess of being reviewed for printing. 2) During late February, it is anticipated that there would be a planning session with all Department Heads, Councilmembers, and the Administrator. . If you have any recommendations regarding this, please advise the Administrator. Tllning and planning for this process for all involved including an outside facilitator will take a fEM weeks . We will update the Arden Hills 2000 Plan, with staff input through Department Heads and Council. The Arden Hills 2000 Plan will be updated and will identify 5-10 year goals and identify responsible parties to carry out those goals. This dOCl.nllE!l1t is a basic and i.nportant dClClUllent for the staff and Council to integrate 1994 and future plans for Arden Hills City Government and City goals. II. INFORMATIONAL ITEMS: A. Un::leroroun::i storaqe Tank Update - The underground storage tank has been relOClVed and disposed of. Approximately 250-300 yards of soil is onsite for reviEM for =ntamination. lab results have been finalized at this time. The onsite evaluation of soil showed some contamination with the final PCA evaluation showing soil . contamination which exceeded accepted PCA guidelines. The removal and disposal costs as anticipated: $ 8.05/yard to haul 42.50 to dispose 50.55 x 300 yards $ 15,165.00 (not budgeted) This disposal should take place within the next fEM weeks. OAF Its . , ~~v L~~ , ED u '. 3 CI" 0 1992 FOR YOUR INFORMATION. THIS ITEM HAS BEEN POST- . THE EVEREST GROUP LTD ~~~~gs~~~/~~~~E~ILL FRANKE - POSSIBILY 1/25/93, 5:30 P.M. December 29, 1992 , Tom Sather Mayor City of Arden Hills 1450 West Highway 96 Arden Hills, MN 55112 Re: Arden Hills Development Property located in the Northeast Quadrant of the Intersection of Interstate Highways 694 and 35W Dear Tom: I am writing to follow up on our recent meeting concerning the potential development of the noted property. At our meeting, I believe we concluded that the appropriate approach would be to . schedule a "workshop session" with the full Council, sometime in January. At that time, we can present our proposal for development to the Council and engage in a free and open discussion relative thereto. In earlier correspondence (copy enclosed for your convenience) I outlined the fundamental elements of our proposal for development. Rather than reiterate that entire proposal in this letter I will simply note the key elements that we feel are necessary to facilitate effective development of the property. ~he key elements, are as follows: 1. Development, to be successful in this marketplace, will need to be in the form of a coordinated mixed use business park similar to our Mounds View Business Park project. 2. To realize the full development of the parcel, the cooperation and participation of the city will be essential. The city's participation will necessarily include creative use of tax increment financing and other available incentives. 3. To assure both continuity, coordination and quality of the development it will be necessary to designate a single and exclusive developer to plan and implement development of the entire area. . 1(1;\; L(ln~ 1.,11.:(. ROlld 1-',\ 1, 1~1l\ 11111 'In. RO'l'\'jlll', ,\Ii'< Ill! :; 'll-?' h ;I)-l)(l(l Ll\: .r) 1..:!1 (dh.(J1 ;;~ . Tom Sather . December 29, 1992 Page Two At your convenience, please give . call to discuss me a scheduling a "workshop" meeting with you and the Council. Your cooperation and assistance herein is much appreciated. Best regards, THE~~ GROUP, LTD. C. William Franke Enclosure CWF/jk . . - . --====-~-=-:.::~---. · THE EVEREST GROUP LTD June 30, 1992 , Tom Sather Mayor city of Arden Hills 1450 West Highway 96 Arden Hills, MN 55112 Re: Arden Hills Development Property located in the Northeast Quadrant of the Intersection of Interstat;e Highways 694 and 35W Dear Tom: This letter is written to follow up on, and to pursue more . formally, our recent discussions concerning the potential development of the noted property. I have set forth below our thoughts regarding the development potential of the site, as well as our proposal with respect thereto. Development Potential The subject property has a number of unique positive characteristics and a number of limiting negative features which, together, significantly influence the development potential of the property. The positive characteristics include a reasonably good location within the metropolitan area, proximity to an easily identifiable interstate freeway intersection, good visibility, and sufficient size to permit planned development. The negative features include difficult access, potential soils and hazardous waste problems, proximity to undesirable uses (e.g. antenna, former rendering plant, etc.) and inflated value expectations by certain land owners. While the real estate development market is generally soft, we feel that limited opportunities currently exist and will continue to exist in the marketplace. We are confident that desirable tenants and owner occupants can be attracted to . development on the property, if the property is positioned correctly both on a use and on an economic basis. 2685 Long Lake Road CC: pa.OQ t- P,O, Box 130190. Roseville. MN 55113 W'/ 7/10/1.-" (612) 636-5500 I f>lans, MayDr , ~ ('ooneil ... De",li~ fro b~ t . Historically, properties in this area and of this nature, have successfully supported mixed use business park type development with uses ranging from light industrial to office. A good example of this type of development would be our Mounds View Business Park project. We do not feel, based upon our experience in and observation of the marketplace, that the site can support office, hotel, or other higher intensity forms of development. Based upon the characteristics of the site and the market for property in the area, we feel that the highest and best use, and in practical terms the only feasible use, for the property will be a mixed use business park similar to our Mounds View Business Park project. The development site can accommodate approximately 1,050,000 - 1,200,000 square feet of developable space depending upon the nature of use and building layout. A preliminary concept plan is attached which shows both the level of development as well as an effective site layout. citv Participation A key element in realizing the development potential of the site will be the cooperation and participation of the city. At this time, most of the communities surrounding . Arden Hills are offering tax increment financing and other incentives to attract and facilitate development. Additionally, most of the same cities have become proactive in the development process creating an environment of cooperation and assistance which acts to facilitate rather that impede development. Absent such city involvement, the development potential of the site is diminished substantially and would not justify expenditure of time or money for proper marketing. Prooosed Develooment Aareement In view of the foregoing, we would propose that the city and Everest enter into a Development Agreement which would contemplate cooperation, joint effort, and joint participation in the planning, marketing,' acquisition and development of the property. The basic elements of agreement would be, as follows: 1. If not already in place, the city will create or agree to create a redevelopment district or an economic development district, as permitted by applicable law, for the purpose of making tax increment financing available to assist and facilitate development. . . 2. The City will grant Everest the exclusive TIF supported development rights with respect to the property for a period of five years. Depending upon achievement of certain reasonable performance levels, Everest would have an option to extend the term of agreement for an additional five years. 3. Everest, with the input, participation and approval of the City, will undertake and complete preliminary planning for development of the property. The goal of this preliminary planning will be to achieve a comprehensive plan encompassing the entire site. Obviously, the plan will need to be established in a manner that satisfies the objectives of the city, while at the same time meeting the demands of the marketplace. The preliminary plan included with this correspondence is, in our opinion, a workable plan given the various competing considerations. 4. Everest will actively and aggressively warket the property to desirable prospects, including potential tenants and build to suit users. When appropriate, and where the mutual goals of Everest and the City can be achieved, Everest will proceed with acquisition of necessary land and development thereof, all consistent with the agreed preliminary plan. . 5. The incremental taxes generated by the new development created on the property, would be paid to Everest for a period equal to the full term of the development district or, until Everest was fully reimbursed for qualifying development costs (including land write down), whichever first occurred. 6. After payment of incremental taxes to Everest, any future increment would be paid to the city for application or distribution in such manner as the City deems appropriate. The foregoing represents a bare bones outline of the respective rights and obligations of the parties under the proposed Development Agreement. Obviously, more specif ic terms will need to be discussed. Nevertheless, the above outline does address what we deem to be the key elements of agreement, and should form an adequate basis for further discussion. In our view, it is only with this form of agreement, that the property can be effectively developed in the foreseeable future. After you have had an opportunity to review and consider the foregoing, please contact me to share your thoughts and . comments. We are most interested in proceeding on the foregoing as quickly and efficiently as possible, and we . '. . anticipate presenting this proposal to the full Council at its next agenda session. I look forward to hearing from you at your convenience. Thank you for your continuing cooperation and assistance herein. Best regards, . TH~~T GROUP, LTD. , C. William Franke President Enclosure CWF/jk . . , - . CONSULTING ENGINEERS Maier Stewart & Associates Inc. MEMO TO: Dorothy Person, City Administrator FROM: Terry Maurer & Mark Graham 1l J,.1 /J1 c;..---- DATE: January 15, 1993 RE: Council Worksession Update 520-039-10 520-030-70 520-042-70 520-043-70 As per your request of January 14, 1993, the following information is provided for discussion at the January 20, 1993 Council Worksession. A. 1993 Pavement Management Program (520-039-10) The feasibility study will be presented at the January 25, 1993 Council meeting. The study discusses the seal coat and overlay improvements for streets discussed at the last . workshop. Two resolutions will be presented for review and consideration by the Council. The first resolution will accept the feasibility study and order a public hearing. The second resolution will order preparation of plans and specifications. This is a similar procedure as followed in previous year's projects. B. Snelling Avenue Median Closure (520-030-70) An eleven page letter, dated January 14, 1993, is attached. This letter details two alternatives in providing an outlet for Snelling Avenue to Trunk Highway No. 51 (T.H.51). The first alternate would realign Snelling Avenue to match the intersection of T.R. 51 and Hamline Avenue, at an estimated project cost of approximately $428,000. The second alternate would provide a frontage road from Snelling Avenue to the south to Lydia Avenue, at an estimated project cost of $393,700 plus wetland mitigation and right-of-way acquisition. Should the Council chose to move forward with this project, we would recommend the first alternate. We have received a number of phone calls and copies of correspondence regarding this matter, with opinion split between providing a new opening and leaving the intersection closed. We anticipate a large turn out at the January 25, 1993 council meeting regarding this matter. . The options we see that the City Council has following discussion at the January 25, 1993 Council meeting are: 1959 SLOAN PLACE, SUITE 200, ST PAUL, MINNESOTA 55117 612-774-6021 9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS, MINNESOTA 55441 612-546-0432 . Equal Opportunity Employer , . . CITY OF ARDEN HILLS JANUARY 15, 1993 PAGE TWO 1. Vote to set a date for an informational hearing to solicit further public input. Given the number of concerned residents, the Council may want to consider a meeting date with this issue as the only item. 2. Choose one of the alternates, pass a resolution to pursue the opening and direct City staff to proceed with the next step in the MnDOT process, which would be to order a feasibility study. 3. Pass a resolution to leave the median closed and conclude discussion on the matter. C. Storm Water Utility (520-042-70) City Planner Bergly has provided an updated summary of land uses and areas within the City, which are necessary to estimate the quarterly revenues generated by a storm . water utili ty. It is our understanding that the Council has discussed rates of $4.95 per residential unit and $49.50 per acre for commercial or industrial properties. A draft ordinance to Chapter 28 of the City Code will be provided at the January 25, 1993 Council meeting, along with two resolutions for review and consideration. The first resolution establishes a City policy for operation of a storm water utility and second resolution establishes the 1993 rates to be levied per quarter. As discussed at the last workshop, the City Council should set a date for a public informational hearing in early March. City staff should also be directed to place an announcement of the hearing date and an informational article in the next City newsletter in mid to late February. It is anticipated that the storm water utility ordinance will be adopted to allow fees to be collected in the second quarter of 1993. D. Ramsey County Roadway Turnback Issues (520-053-70) A letter dated January 5, 1993 was provided which briefly outlined the consolidation proposal for roadways by Ramsey County. A copy of this letter is attached. We are prepared to discuss this matter at the January 20, 1993 work session. Attachment . MEM0-039JAN MG:db , . . . rI'/,I~.,:,/- CONSULTING ENGINEERS Maier Stewart & Associates Inc. January 5, 1993 File: 520-043-70 Ms. Dorothy Person City Administrator City of Arden Hills 1450 West Highway 96 Arden Hills, MN 55112 RE: RAMSEY COUNTY ROADWAY FUNCTIONAL CONSOLIDATION PROPOSAL Dear Ms. Person: As requested, we have recently met with Jim Tolaas and Dan Solar of the Ramsey County Public Works Department to further discuss the effects on the City of Arden Hills of the proposed functional consolidation of roadways in Ramsey County. Basically, the proposal . calls for the City of Arden Hills to take over 1.19 miles of County roads and 2.61 miles of County State Aid Highways for a total of 3.80 miles. In turn, the County would take over 1.48 miles of City roads. Therefore, there is a net gain in mileage for the City of2.32 miles. The following table lists the roadways in Arden Hills involved in the proposed turnbacks: PROPOSED COUNTY ROAD TURNBACKS TO CITY: Lgth Designation RD# Road Name Mile.point Section Termini !Mil Exist :enm 12 Co. Road F .6-1.52 NBt AH-Snelling 0.92 CSAH City 132 Harnline Av 3.56-3.88 Hamline Av- 0.32 County City Ingerson Rd 101 Ingerson Rd 0-.49 Hamline Av- 0.49 County City Lexington A v 49 Lake Johanna Blvd 0-0.83 Co Rd D-Co Rd E 0.83 CSAH City 76 Snelling Av 0-.86 TH 51-Co Rd E 0.86 CSAH City 163 Stowe Av 0-.25 Cleveland Av- 0.13 County City New Brighton Rd 163 Stowe Av .25- .5 New Brighton Rd 0.25 County City Lk Johanna Blvd 3.80 ~ 1959 SLOAN PLACE. SUITE 200. ST PAUL. MINNES01J\. 55117 612.774-6021 9800 SHELARD PARKWAY. SUITE 102. MINNEAPOLIS, MINNESOTA 55441 612-816 G432 . Equal Opportunity Employer -------- , . , . Ms. Dorothy Person January 5, 1993 Page Two PROPOSED CITY ROAD TURNBACKS TO COUNTY: Lgth Designation RD# Road Name Mileooint Section Termini !Mil Exist fmII NR County Road F 1-694 to Lexington 0.44 City IC NR Hamline Ave 1-694 to TH 96 1.04 City IC To enact the entire turnback proposal requires legislative action. It will likely not occur unless the MnDOT Office of State Aid allows the Cities receiving excess mileage to place it on the State Aid system without penalty. This should increase the City's annual allotment thus providing some funding source to maintain the turnbacked sections. In our discussion with Jim Tolaas and Dan Solar, they indicated the County is interested in proceeding with a couple of the turnbacks immediately. They would like County Road F turned back to them and would take Hamline Avenue, a total of 1.48 miles. In exchange, they . would like the City to take back Old Snelling Avenue and possibly some other segment. Along with the turnback, the County is proposing a one-time lump sum payment of approximately $8.00 per square yard. This is about the cost of an overlay. These are several issues we should discuss with the City Council regarding this proposal. We will be available to discuss this with the City Council at their upcoming workshop. Sincerely, MAIER STEWART & ASSOCIATES, INC. T~~ TJM:tp 043-0606.ja. . , , . CONSULTING ENGINEERS Maier Stewart & Associates Inc. January 14, 1993 File: 520-030-70 Honorable Mayor and City Council City of Arden Hills 1450 West Highway 96 Arden Hills, MN 55112 Dear Council Members: The purpose of this letter is to investigate possible access improvements at TH 51 and Old Snelling Avenue. According to Minnesota Department of Transportation (MnD0T) representatives, the improvements are eligible to be partially funded through MnDOT's Cooperative Agreements process. . INTRODUCTION In December of 1991, MnDOT closed the TH 511Snelling Avenue median opening due to safety issues. Since the median closure, the Arden Hills City Council and concerned citizens have met with MnDOT to discuss alternatives for the intersection. At an informational meeting held on November 23, 1992, Tom O'Keefe from MnDOT presented the following alternatives: 1. Realignment of the Old Snelling Avenue, Hamline Avenue, and TH 51 intersection, including signalization. 2. Construction of a frontage road from Old Snelling Avenue to Lydia Avenue. 3. Widening the County Road E bridge. 4. Continue with permanent closure of the median by removing the bituminous surfacing and establishment of a boulevard. As the bridge widening does not address the Old Snelling Avenue access, this letter discusses the feasibility of both the intersection realignment and frontage road. EXISTING CONDmONS At the Old Snelling Avenue intersection, TH 51 is a four-lane divided highway with a posted speed limit of 55 miles per hour. The median opening had allowed left turn access from northbound TH 51 to Old Snelling Avenue. The Hamline Avenue and Old Snelling Avenue . (CSAH 76) intersections with TH 51 are offset a distance of approximately 500 feet. Both Old Snelling and Hamline Avenues are currently under Ramsey County jurisdiction. 1959 SLOAN PLACE, SUITE 200, ST. PAUL, MINNESOTA 55117 612.n4-6021 9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS, MINNESOTA 55441 612-546-0432' Equal Opportunity Employer 03t>I5<l6.dco . Honorable Mayor and City Council January 14, 1993 Page Two Information provided by MnDOT shows that between January 1986 and December 1991 when the median was open, 28 accidents occurred at the intersection. Eleven of the accidents involved vehicles using the median opening. All accidents caused personal injuries, including three fatalities. In a letter dated November 26, 1991, to the City of Arden Hills, MnDOT indicated that, after a review of all data, the median closure was warranted. INTERSECTION IMPROVEMENTS - ALTERNATIVE 1 The proposed TH 51 and Snelling Avenue intersection realignment is shown on Exhibit 1. This alternative turns the Hamline Avenue/Old Snelling Avenue/TH 51 area into one intersection with the streets at right angles. The intersection would also be signalized. The estimated construction and project costs are shown in Table 1. The total project cost is estimated at $428,007.50. The estimated overhead items have been calculated at 32 % of the construction cost, as outlined in the City's Assessment Manual. . It appears that existing right-of-way is sufficient to construct the intersection improvements. Therefore, no additional land acquisition costs, which would be loo% City funded, would be incurred with this alternative. Old Snelling Avenue is currently a Ramsey County roadway. The County is planning to turn back Old Snelling Avenue to the City of Arden Hills. The intersection alternative would require coordination of the turnback with the County. Mounds View School District offices are located at Hamline and Lydia Avenue. Mr. John Ostlund, the District's Assistant Director of Support Services, was contacted regarding their position relative to the median closure. He stated that the schools had stopped routing buses through the TH 5110ld Snelling Avenue intersection for safety reasons three years prior to the median closure. Mr. Ostlund indicated that if the intersection were sig,,~li7P1l, the School District would utilize it for bus routes. As shown on Exhibit 1, there is a wetland to the south of Old Snelling Avenue. The wetland appears on the US. Fish and Wildlife National Wetland Inventory Map. Construction affecting a wetland area requires permitting from both the Corps of Engineers and Rice Creek Watershed District (RCWD). Wetland mitigation is required by RCWD at a minimum ratio of 1:1 to a maximum of 2: 1. Construction of the proposed intersection may affect a portion of the wetland. In this case, the area north of the proposed intersection would be proposed as an area for mitigation. . It is our understanding that funding for the proposed intersection alternative would be 50% State costs, 25 % County costs, and 25 % City costs. The State costs would include normal roadway improvements on TH 51 at the intersection and one-half of the signal costs. Mr. O'Keefe indicated that additional MnDOT funding may be available if the median openings at 03Cl-1506.dcc . ~v <( /-- / / /~ .... / NOR TH \ I / 'ItEl'lAlD AREA / , / , I I / I / I I I I I I I I / t t I I I I I LAKE : JOSEPHINE I I I I I I \ , \ \ \ \ \ GLENHILL RD. \ , " "~I " t~~ EXHIBIT 1 INTERSECTION MODIFICATION llaier Stewart. T.H. 51 / SNELLING AVE. & Associates Inc. AT HAMLlNE AVE. -------- . TABLE 1 ESTIAIA TED COSTS - AL TERNA TIVE 1 T.H. 51/SNEWNG AVE. INTERSECTION IMPROVEMENTS CITY OF ARDEN HILLS PROJECT NO. 520-030-70 ITEM UNIT NO. ITEM UNIT QUANTITY PRICE TOTAL 1 REMOVE BIT. SURFACE SY 6000 1.25 $7,500.00 2 REMOVE PIPE LF 370 5.00 $1,850.00 3 REMOVE CONCRETE MEDIAN SY 325 7.50 $2,437.50 4 TRAFFIC CONTROL LS 1 SOOOO.OO $50,000.00 5 COMMON EXCAVATION CY 2000 8.00 $16,000.00 6 SUBGRADE EXCAVATION CY 2100 5.00 $10,500.00 7 SELECT GRANULAR BORROW CY 2100 7.00 $14.700.00 8 SUB GRADE PREPARATION STA 15 100.00 $1,500.00 9 CLASS 5 AGGREGATE BASE TON 2015 6.50 $13,097.50 10 TYPE 31 BASE COURSE TON 1050 22.00 $23,100.00 11 TYPE 41 WEAR COURSE TON 1050 25.00 $26,250.00 12 TACK COAT GAL 450 1.25 $562.50 13 CONCRETE CURB & GUITER LF 1000 6.00 $6,000.00 14 CONCRETE MEDIAN SF 100 30.00 $3,000.00 15 SIGNAL SYSTEM LS 1 100000.00 $100,000.00 16 STORM SEWER SYSTEM LS 1 40000.00 $40,000.00 17 SODDING SY 3S00 2.00 $7,000.00 18 SEEDING AC 0.5 1500.00 $750.00 ESTIMATED CONSTRUCTION COST $324,247.50 OVERHEAD (32%) - includes administralion, mgincering. fiscal & $103.760.00 legal costs per Arden Hills assessment manual. ESTIMATED TOTAL PROJECT COST ' '"" tf'l 0: ~ 1'>:::: , -<-~...../.."~ ,~ . - - ------- . Honorable Mayor and City Council January 9, 1993 Page Three Glen Hill Road and Asbury Avenue could be closed. The County's share of costs would include normal geometric improvements on the Hamline Avenue leg of the intersection and one-fourth of the signalization. The City would be responsible for funding the Old Snelling Avenue improvements and one-fourth of the signal. Any additional features, such as sidewalk, would be 100% City funded. Alternative 1 could be expanded to include construction of a frontage road along the west side ofTH 51 between Old Snelling Avenue and Glen Hill Road. This alternative would allow for closure of the entrance/exit on TH 51 at Glen Hill Road. Further investigation would be necessary to determine the need for additional right-<>f-way. The impacts on surrounding properties, for example, the northwest corner of Glen Hill and TH 51 and the wetland area south of Old Snelling Avenue, could make the frontage road option costly. Mr. O'Keefe indicated that MnDOT would most likely participate in roadway costs for this option. FRONTAGE ROAD - ALTERNATIVE 2 . The proposed frontage road improvement consists of construction of a 32-foot wide road along the west side of TH Sl between Old Snelling Avenue and Lydia Avenue. The proposed location is shown on Exhibit 2. The frontage road alignment would require additional right-of- way acquisition, a portion of which is in the City of Roseville. The estimated construction and project costs for the proposed frontage road are shown in Table 2. The total project cost, including overhead, is $393,730. The construction cost of $298,280 is based on a typical 32-foot roadway. Although this cost appears to be less than that of Alternative 1, the cost would increase significantly with right-<>f-way acquisition. If it is possible to acquire sufficient right-of-way to construct the frontage road, the City would be responsible for 100% of the right-of-way costs. Another City cost that would involve additional land acquisition is wetland mitigation. Other items not included in the estimate are the impact on Northwestern College entrance roads and utility relocation. The costs for right- of-way and these additional items could easily exceed the frontage road construction cost and would be funded by the City. The alignment affects two wetland areas. The larger of the two wetlands is just south of Old Snelling. The second area is north of Lydia Avenue on Northwestern College property. The permitting requirements for this alternative are the same as discussed with the intersection alternative. There does not appear to be a location in or near the proposed site that would accommodate additional wetland areas. . The frontage road intersection with Lydia Avenue would impact the Northwestern College entrance. The existing brick pillar entryway, wrought-iron fence, and an established grove of trees would be affected by the proposed alignment. 030-1506..... . '-" > ..: - -...... ......, '\\ \' IJ... / > /.-." // ..,/ ,;/{' 'f.. ~ '.- /-'~ \>- ," -' '- y.. "," as \ ~ GLENHILL RC'. ~ '" NORTHWESTERN COLLEGE ~ NOR TH EXHIBIT 2 t~~ AL lERNA lE FRONTAGE ROAD TO LYDIA AVE. llaier Stewart. T.H. 51 / SNELLING AVE. t Associates Inc. AT HAMLlNE AVE. - TABLE 2 . ESTlAIA TED COST - AL TERNA TIVE 2 T.H. 51 FRONTAGE ROAD CONSTRUCTION CITY OF ARDEN HILLS PROJECT NO. 520-03~70 ITEM UNIT NO. ITEM UNIT QUANTITY PRICE TOTAL 1 COMMON EXCAVATION CY 4200 8.00 $33.600.00 2 SUBGRADEEXCAVATION CY 6300 5.00 $31,500.OQ 3 SELECT GRANULAR BORROW CY 6300 7.00 $44.100.00 4 SUBGRADEPREPARATION STA 32 100.00 $3.200.00 5 CLASS 5 AGGREGATE BASE TON 4200 6.50 $27.300.00 6 TYPE 31 BASE COURSE TON 1540 22.00 $33.880.00 7 TYPE 41 WEAR COURSE TON 1540 25.00 $38,500.00 8 TACK COAT GAL 520 1.25 $650.00 9 CONCRETE CURB & GUTTER. LF 6400 6.00 $38.400.00 10 CATCHBASrns EA 14 1000.00 $14.000.00 11 IS'RCP LF 400 30.00 $12,000.00 12 15"RCP FLARED END SECTION EA 7 550.00 $3.850.00 13 SODDrnG SY 6400 200 $12,800.00 14 SEEDrnG AC 3 1500.00 $4 500.00 ESTIMATED CONSTRUCTION COST $298.280.00 OVERHEAD (32%) - includes adminia1ration, engineering, fiscaJ. & $95.450.00 legal costs per Arden Hills a~"""""'ent manual ESTIMATED TOTAL PROJECT COST "Does not include right of way costs. . . Honorable Mayor and City Council January 9, 1993 Page Four The frontage road is the preferred MnDOT alternative as it would eliminate three entrances/exits on TH 51 at Old Snelling Avenue, Glen Hill Road, and Asbury Avenue. Funding would be available for roadway costs through MnDOT's Cooperative Agreement process. The Cities of Arden Hills and Roseville would be responsible for the cost of all right- of-way acquisition and any utility relocations, making this the more costly alternative. PROJECT SCHEDULE Exhibit 3 shows MnDOT's local initiative project development process. A proposed project schedule corresponding to this process is as follows: Planning Process Idea or Need Identified March 1991 Meet with MnDOT Project Coordinator November 1992 Coordinate with MnDOT Counterparts December 1992 Advise Locals Next Step December 1992 . Develop "Right" Picture (FeasibilitylLayout) January 1993 Develop Cost Estimates February 1993 Desie-n Process City Develop Plans & Specifications February 1993 City Submit 3 Copies for Review March 1993 Revise/Resubmit April 1993 MnDOT Approval June 1993 City Advertise for Bids June 1993 City Signs Cooperative Agreement and Receive Reimbursement August 1993 Eligible Costs City Awards Contract August 1993 Complete Construction November 1993 This schedule would be delayed if MnDOT funding is not programmed for 1993. CONCLUSION Both alternatives are feasible from an engineering standpoint. The cost of right-of-way for the frontage road would increase the estimated cost for Alternative 2. Alternative 2 would also require extensive coordination with the City of Roseville and Northwestern College. Of the two alternatives, the proposed intersection realignment would provide the least cost to the City. . 030-IS06.dec - I .. :l . ;;; . :l ~t~ .~ :;; l! i R ... "- OU . "" = 1;- .. .. '" ge a. -' e So r-- U~ O",C ~ .~ ... :J ~4JE j1.Q - ~ :. oft; ....-ni II: 0 ';j ~ VI Cll: Stj...,S.J!.<; , . ,.-L- l! - ~U;~U.~& .., .. ~ It VI u ~88~d . ~ .,.. ~ ~.~ CII * . . . . . -II! ~ ~ I t..~ !! d I - 0 0 ..: l .. i ..... _ <i I 5 ~ e ......- D- au . ".ii - a: 0_ i~~~ lI..w . -a =!.. li" 6.w ... .;.. ~Z:J! .... r::: ~ Oi~ G!re ~(/) lC U"- . . . . . . CII E I I a. li. ~, '" ......w 0 .. tl' .~ ... :It :lIre - ~l: ~li' CII .. lI\; g~ , ::- jl. -s:: I CII c...... . . Q I r-r-r- lI. - II 5'U . . ti ~ - i,Q ::! ! l! - "ll "- CII i! 'li :so - .., .. f 2 ~ < I .... ilj !! - __'-r j 0 r- r- ....... & U) i.~ .. 'l!. 0 :;; ii a. s :J .!l ~ .i!! 5. .. '5 I '- ~ I! . . '0 . ~ CII I . ~ "- I :a "'1 '-'-- .- - ." . ... <>.. ':.!! ~il.i fa Iii 0,. .- i!" ... il .- I r::: - ii."!! I r- r- ... - I ....e fa R ~i . ~ ~ .. -;- 2R 0 ... ! i -. I ... z.. aa ...... ...... .1 r- ..- I! _lI 1 511 31 J ~ .=. .'-- - - . -~--- ) EXHIBIT 3 t~~-" DEVELOPMENT PROCESS Maier Stewart FOR &c '........;lIotes Inc. LOCAL INITIATIVE PROJECT . Honorable Mayor and City Council January 9, 1993 Page Five Therefore, if the City desires to pursue the median opening, the next step as outlined in the proposed project schedule is for the City Council to order a Feasibility Study for the intersection realignment. Sincerely, MAIER STEWART & ASSOCIATES, INC. ~~ -.::5~4 /J~-rT Terry . Maurer, P.E. Susan J. McDermott, P.E. TJM:tp . . lllO-I5Ol\..... .- , CITY OF 1\RDEN HILlS . HEHIU\NDUK '1'0: Mayor and City council FRQ(: Dorothy A. Person, City ]ldminiRtrator t:fJ DM'E: January 15, 1993 BtlIl.1ECl': City organizational Review - Update and Reccmnendation '!he following is a synopsis of the reorganization of internal duties of City Hall staff of Arden Hills. As you will find, the primary focus of reorganization is on centralized purchasing 1.U1der Finance and the revision of priorities under the =ent Planning and Zoning l\dministrator/Deputy Clerk. '!his reorganization focus to provide time to priorities to address community concerns . '!hese have been identified through Arden Hills 2000, the City survey, the League of Minnesota cities and state legislature priorities. '!he Deparbnent Heads will be proactive and involved in overall planning of their responsibilities, review and recommend any items in work relating to legislative change, to area-wide changes by Council, by Met Council and the . state/legislative actions, by consolidation and cooperation issues. The result will be addressing community needs through a proactive rather than a reactive stance. Deparbnent Heads will be required to operate in a higher management level. '!herefore, Deparbnent Heads will act in an overall view and long-term planning JOOde versus putting out fires. One exanple of the change is Deparbnent Heads will be to manage contractors rather than si1nply be responding. This puts the City in a leadership role to address long term needs and requirements of the city. This higher level of expectation of management will have an effect on their view and follow through of daily work activities required of cu=ent line staff. '!his outcome is expected with only miniInal staff increase - 1 clerical. As a new l\dministrator, you will see initially a more involved hands-on approach to governing of the city. For this purpose, the l\dministrator will be involved in the reviewing of more detail of each cleparbnent within the city. The enclosed organizational chart shows that the City l\dministrator will be more hands-on in overall administrative duties. PreviOUSly, these duties may have been done on a limited basis, such as personnel or risk management. '!hese duties include MIS, Records and Data Practices, Personnel, Elections, Risk Management, and Short and IDng Tenn Planning. Each of these areas are not a full-time job in the city of Arden Hills. However, I believe that each of these areas need a serious review by the Administrator. . , . city Organizational Revi_ - update and Reo ........dation Page Two Based on a review of best use of city funds, the position of the city Aa::ountant needs to be provide:i time for a centralized purchasing function to be active and effective in the best use of taxpayer's funds. '!his was previously in the A=untant's job description and would continue. However., the Aa::ountant has needed to have the time provide:i for this purpose. , More involvement of the City Administrator eliminates the need for a Deputy Clerk role: the Planning and Zoning Administrator will be adopting additional and more indepth duties. However, other technical areas are needed to be actively managed. '!hese areas have consistently been seen as major areas of need previously, however, the staffing level has been lllnited. '!hese areas include direct and active supervision of inspection, co:ie enforcement, more indepth review and more participation in planning and zoning administration from a staff perspective, licensing and pennits, and an:i1na1 control. New areas have been identified as highly il11perative include envirornnental issues, econcmri.c development, COI1Ul1UI1ity cammunications through Cable and news releases, and an:i1na1 control. '!he proposal for this position title is Community Planning Coordinator with planning and zoning. '!his revised position is a =itical and highly professional position. It includes technical areas that have not previously been identified as a specific piece of any individual's job. '!his position is also a very visible . position within the Community. '!he planning and zoning, and the economic development are very c::onpatible and lerrl themselves to a good Im<:Mledge of sllnilar issues and is very involved in working with businesses in Arden Hills. '!his position will be needing to be aware of the business activities and potential businesses for econcmri.c development purposes as they occur. '!he Administrator and the Community Planning Coordinator will be working closely together to develop these programs in the next year or two. Much of the time needed for economic development will depend on the future of the Arsenal site and the land that mayor may not be available from that property. Each of these changes have been reviewed in order to make best use of City funds and efficient use of activities required of each Department and for each service to the citizens. It is recommended that a General Clerk position be added to the city staff. '!his position would provide assistance in detailed and administrative activities of the Community Planning Coordinator, Parks and Recreation Director, and Public Works SUperintendent. '!he General Clerk will be expected to pick. up the day-to-day phone answering, information gathering, typing, and preparation for meetings. In addition, the General Clerk would be expected to be able to be prepared to give citizens information on straight-fOrward information, such as dates of snowplowing, snowplowing rules, and signup in addition to general information on zoning issues, Planning CoJmti.ssion activities, and meeting dates. '!his will provide each of these 3 Department Heads additional time to carry out other management activities expected of a Deparbnent Head. . ------ . City organizational Review - Update and Reo- ....oAndation Page 'Ihree The danino result of these management expectations in the most cost-effective position for tax dollars. This position would IMke use of current staff through a job change of the current Receptionist. One additional clerical person would need to be hired. However, this would require additional staffing at the Receptionist level. . 'Ihis should increase the efficiency of Department Heads management capabilities . It is believed that this small change will result in the City preventative services giving a proactive service to the citizens, provide for long-term planning, and provide for a more cost efficient delivery system of services. CPNCLUSIONS: It is recamnended that the City Council approve the addition of one receptionist position. Funds to be taken from the 1993 budget (approx:in>ately $18,283 plus benefits): increased income in Licensing and Fees, savings in less independent contractor costs (Le., Planner, Engineer), staff support time, IOClre timely typing, more complete records, inproved services to planning and zoning issues, Building Inspector and more ordinance enforcement, increased activities in Community Developnent and tax base timely responses to public regarding Recreation, Public Works, and Parks. This does not increase the 1993 Budget but anticipates savings in receipts to the City through . licensing activities, service in the recreation activity, and in service to the citizens through the planning, zoning, economic development/redevelopment activities in the Community/Zoning Coordinator. DAP Its Attachments . , f.!l Z f.!l . H Z ~ ~ '"" H .... U'"" 0 Z Z p:;.o:. P:; ~ HlIlOE-<,"" ... E-< :l::Zr:...Z~f.!l Z . f.!l OOZ~:>Of.!llllO Z I). f.!l.o:HI'iI~~P:;ZE-<U III H Z E-< OI).HH ~ Z . Hf.!lU~O lIl1ii'"" U ~ I ZZ~OP:; 'I'iIZ ~ H ZHI).OHZ,""~~ E-< :SZlIlU~O~UI).H U I). OZ U.o:H;:ij ii1 0 I).NH ~~U'"" 1ii U I). . . . . . . . . . ~ M ~ E-< , en I ~ f.!l ..... Z I 0 M "',""lIlE-<,"" f.!l ~Z:l:: P:; P:; f.!lZ >< lIlZOf.!l'" ~ ...... ~ZZH III OZH:l:: U .o:'""gjOHlIl P:;OE-< E-< ~ '"" HE-<::J Z OlllU~P:; "'OlllE-<~ 0 lIlUgj~lIlO p:;r;;:::lf.!lU H H~ ,""H:I: H 1).>< og; E-< :l::P:;I).~P:;lIl r:... """.0: p:;.o: 0 .0: .o:1).E-<E-<~1). E-< . . . . . . Z . . . . . . ~ :l:: ~ '"" I). :l:: H ~ '"" P:; U '"" 0 ;:ij gj 0 ~ U r:... ~ ZlIl~,"" P:; ~~P:;O :I: III '"" E-< E-< E-<P:; E-< . ~ H III ... Z E-< H U H Hf.!lOZP:; ~ N S Z ~ ~O~O~ H H P:;lIlUE-< 0 E-< 0 ::;: 1)..0: III I'iI H U 0 I). ~ I'iIO~ 0 U .0: UlIl~P:; ~ ~H~O ~ >< I).P:;O~r:... Z E-< H . . . . . III U .0: III ~ f.!l I'iI .0: U E-< ~;:ij ~ III UZ Z Z III ~1'iI ~Z H ~ E-<~iiiO /;jZU H N g HZ:>E-< en E-<~~OU I Z r:...P:;0 ..... U H ~I).P:; 0 H ~><O:l::E-< I '"" E-< HlIl N ~ H,"" Z ..... 0 O,""HOO I). .o:H:>.o:U ::;: O~HO 0 P:; UP:;... P:; r:... . . . . 0 ~ E-< Z ~ :l:: . ~ H >< I). ~ P:; :l:: i\;i 0 H E-< ~ H ~ 0 ~ E-< 0 .0: .0: 0 E-< , .~ . , ARDEN HILLS CITY ADMINISTRATOR ORGANIZATIONAL UPDATE . TO COUNCIL JANUARY 19, 1993 . . SUCCESS?? Clementine Paddelford's Father - Never grow a wishbone, daughter, where your backbone ought to be. . 1. Set aside time each day to review what you've done. . 2. Measure success in terms of what you gain not what you lose. . 3. 80% of achievement is having the guts to try. . COMMUNITY REVIEW AND RAMSEY COUNTY LEAGUE RESULTS I. What changes are expected in Arden Hills? . County and state funding changes - consolidation and cooperation moves: a. Roads policing b. Parks c. Recycling and environment II. Why are changes necessary? To respond to previous actions and studies of outside forces and to anticipate and be ready for our future. . III. CITY SURVEY 1991 RESULTS OF SERVICES GREATEST NEEDS: 1. Department Heads are expected to Manage Proactively: a. Increased interaction with associations and organizations. b. Watch legislation. c. Stay informed of trends and changes. d. Identify more effective ways of service delivery . e. Actively watch dollars by each department f. Liabilities, purchasing, income sources. . g. Future economic development involved in high loss potential, i.e.; environment we're in. h. Proactive management. . COMMUNITY REVIEW AND RAMSEY COUNTY LEAGUE RESULTS Page Two I. Direct the City's contractqrs rather than only being responsive. J. Increase positive public contact and relations. k. Skills building of self and employees. 2. Staff responsibilities - a. In all areas of each job, synergism is synchronization of energies. b. Proactive in public information and communications. c. Be proactive and advisory to Departments Heads. . 3. RECREATION: a. 61% prefer outdoor leisure (men) and more youth activities are needed. Move towards self- funding. 4. PARKS: a. Spring maintenance is seen as better than winter. Over half the people are okay with spending tax dollars for Parks & Recreation. b. Increase parks costs to improve maintenance of parks but want open space. 5. CODE ENFORCEMENT: . Low rating or services - This should include stray animals. . COMMUNITY REVIEW AND RAMSEY COUNTY LEAGUE RESULTS Page Three 6. PUBLIC WORKS: , a. Potholes, City street maintenance needed. b. Snowplowing response needs improvement. c. Street lighting improvement needed. 7. ECONOMIC DEVELOPMENT AND REDEVELOPMENT: (Highly Important) a. Response of 3-1 to mandate the City be more aggressive for a mix - residential, commercial and light industrial. b. Homes - single family type (high priority), then townhouses, senior housing. . c. Discourage retail shopping centers. d. Encourage office space. 8. COMMUNICATIONS/CABI B/NEWSLETTER AND NEWSPAPERS: a. Best communications source for citizens - newspaper. b. City needs improved variety programming and Cable; 46% of citizens have access to Cable. c. Suggest City use newspapers for regular columns of City information and press releases. . . ADMINISTRATIVE FINDINGS OF SEPTEMBER, 1992 EMPLOYEE MEETINGS: Basically, the City has a: . . Stable environment. . Variety of duties is enjoyed. . Employees generally like their jobs at Arden Hills. . Employees enjoy co-workers. . Friendly atmosphere with citizens. . Good support of Council, employees know what . happens day to day. . Working conditions need improvement. . Some frustrations with: Lack of funding to meet needs they see. Lack of proper staffing. Lack of direction. Lack of cohesiveness and teamwork. Feeling that Council does not support staff. Lack of training. Lack of openness to new ideas, i.e.; "We've always done it this way. We don't need to keep up with the world." . . WHAT DOES IT MEAN TO US/HOW DO WE ACHIEVE THIS? 1. Department head changes - proactive mode. a. Planning . 2. 1991 Citizens Survey review - Comments from Citizens: a. 70% excellent staff and 12% disapprove. b. Service is rated higher than suburban norm. c. Personal attention - good experience. d. Services generally can improve. e. 54% of citizens had contact regarding general information - but complaints lodged and lacked parks information. f. (1) 13% dissatisfied with personal contact . (average to norm). (2) Dissatisfaction was with content of response not process. . - " . EFFECTIVENESS: 1. . Achieving 80/20 rule - Be 80% effective by achieving 20% of goals. Conc~ntrate on most important items first. . Choosing the right goals from a set of alternatives and reaching them. . More an art than a science. 2. . Focus on results - results are from doing less . better - invest your work to get out what you want. . Communication - grow antennae, not horns. 3. . Distinguish between urgent problems and important problems. Urgent things seldom are important and important things are seldom urgent. . 4. . Invest the work to set goals and accept the responsibility for them. . Solve problems in a simple, rational way. ., Cl Z o ,H. Z fil ~ ...:l H .<11 U...:l 0 Z Z 1>:,(' I>: j HCIl08...:l <II 8 . ~Z~ZfilCl Z Cl OOZfil OClCllO Z 0. Cl'(Hfil~~I>:Z8U CIl H ~ Z 8 ZOo.HH fil Z . HClUfilO CIl~...:l U j ~ ZZfilOI>: .filZI>:,( H jHo.OHZ...:lfilfil~ 8 ZCIlU~O~Uo.H U 0. OZ ZU,(H Z i::i 0 o.NH filfilU...:l ,( Il.4 ~ U ... .... . . fil M ,( 8 ~ 8 I ,( Cl M o Z I <II...:lCll83 Cl M filZ~ I>: I>: ClZ ~ CIlZOCl<ll fil ~ filZZH ~ OZH~ U ,(...:lP:;OHCIl 1>:08 8 Z ...:lPH8~ Z OCllU~1>: ~ ~OCll8fil~ 0 CIlU I>:filCll 0 Z 1>:~~ClU H Hfilfil...:lH~ H o.~fil OP:; 8 ~l>:o.filP:;CIl ~ ~,(P:; PP ,( ~0.88mo. 8 . . . . . . z . . . . . . f.LI ~ fil ...:l 0. ~ H fil ...:l P:; U ...:l o Z CIl P 8 U ~ fil ~ ~ fil ZCIlfil...:l . I>: P:; fil~P:;O ~ CIl ...:l 8 8 81>: 8 Z H CIl ~ Z 8 H fil U H HClOZP:; ~ N Z Z ~ ~OfilOfil H P H ~I>:CIlU8 0 8 0 ~ o.~ CIl fil H U 0 0. ~ filOfil 0 U ~ UCIlfilP:; fil filHfilO fil ~ o.P:;O~~ Z 8 H . . . . . CIl U ,( CIl fil Cl fil ~ U 8 Z CIl CIl fil~ 8 UZ Z Z CIl Zfil filZ H ~ ~8fil~0 I>: ZZUfilH ~ o filHZ~8 ~ ~ 8~filOU I Z~~I>:P M U H filo.l>: 0 H ~~O~8 I ...:l ~8 HCIl ~ m H...:l Z M P O...:lHOO . P< ~H~~U ~ 08HO 0 I>:PU I>:~ P:; ~ . . . . C fil 8 Z . i ...:l ~ 0. fil P:; ~ @ ~ H o H fil 80m 8 P ~ ~ 0 F-t '. . . .. , , . I . . . . A strong team collapses togethe~ . ~ '"'\) . , . ) - . " . . CITY OF ARD!N HILIB mDWlDtlH DATE : February 8, 1993 TO: Dorothy Person, City .l\dmini.strator FRa!: Dan Winkel, Public works superintendent stlBJEC'l': 1\qenda Item for February and March OOImCil worksessions I would like to add to the February Council worksession, the final report on the rust problem pertaining to the water tower on Fernwood st. I do have the photos that are referenced in this report. It would be ideal to do any of the required repair work clearly this Spring. We do have $J?'" - 00 in the 1993 hld.get to repair the :rust problems. The report T~ ~ineering suggests other repairs and modification" ~ Water Works Association standards. The esH--' :he work listed in the report would be ar I would also request tilne atus of the Arden Hills water loss pre jt_V m, I would . like to discuss up:lating a. ills. I have been =llecting infonnatior, lOlogy that might make the meters rrore , pl ters more cost effective. DAW:rk Attaclnnents . . . . . . .. .. ELEVATED WATER TANK INSPECTION REPORT 500,000 GALLON CAPACITY . CONTROL DATA TOWER . CITY OF ARDEN HILLS, MINNESOTA AEC PROJECT NO. MN 1410 . . ft I. I AEC ENGINEERING, INC. 511 ELEVENTH A VENUE SOUTH I SUITE 405 MINNEAPOLIS, MN 55415 TELEPHONE: 612-332-8905 . -.....-------. ---- - . . , . . . AEC ENGINEERING ENGINEERS . INSPECTORS 511 Eleventh Avenue South Minneapolis, Minnesota 55415 . Phon.: 16121332-8905 Fax: 16121334-3101 ELEVATED WATER TANK INSPECTION II No. MN 1410 II Client: City of Arden Hills, MN. Contact Person: Dan Winkle " Telephone: 612/633-4443 Tank Description: 500 MG Hydropillar Tank Location: Fernwood Avenue . Type of coating: Interior: Aluminum Phenolic/Epoxy Exterior: Alkyd type II Inspected by: Jack R. Kollmer Date of Inspection: October 6, 1992 .. 1.0 SUMMARY . The tank requires a complete new interior wet coating above it the high water level (HWL) and exterior dry coating within 1 to 2 years. The interior wet coating below the HWL and the interior dry coating need spot repair and limited area . replacement within 1 to 2 years. It appears that the tank was last coated in the interior wet in 1981 (below the HWL) ~ and 1968 (above the HWL). In the interior wet area, above the HWL, the coating is failing apparently due to age and . deterioration. In the wet area below the HWL the coating is failing in random spots due to poor surface preparation and . application at weld seams and erection scab marks, and requires spot repair. It is unknown when the interior and exterior dry areas were last coated, but they appear to be . original coatings. See photos in Appendix A for examples of ,. current conditions. . -,."._~--_..- . , .. Page 2 City of Arden Hills, Minnesota II AEC Project No. MN 1410 . Structurally, the tank is sound. However, various structural modifications such as additional vents, manways . and miscellaneous repairs are recommended. II We recommend epoxy caulking or seal welding of critical internal seams above the high water line (HWL) which are not II welded. Although this is not required by AWWA (American Water Works Association) this will prevent rust streaking and extend the life of the coating. Also, we recommend the . seal welding of all internal seams below the HWL Which are not Welded, as required by AWWA. Refer to sections 2.1 and . 2.3 for specific recommendations. .. We have done a total lead content analysis on the exterior and interior coatings. The results indicated a 4.6 percent II lead content for the exterior dry and a 6.6 percent lead content for the interior wet area above the HWL. (See . Appendix D) . Per current Minnesota Pollution Control Agency interpretations, the paint in these two (2) areas is .. classified as lead based paint. Removal of lead based paint must be performed in accordance with applicable Federal (RCRA, EPA) and State (MPCA) regulations. Reconditioning II specifications must be designed to include full containment and provisions to eliminate generating hazardous waste. . We' have done a total lead content analysis on the interior . wet coatings below the HWL. The results indicate a 0.2 percent lead content. Per current Minnesota Pollution I Control Agency interpretations, the interior wet area below the HWL is not classified as lead based paint. .e . . .. Page 3 City of Arden Hills, Minnesota II AEC Project No. MN 1410 . It is estimated that the complete recoating plus the recommended modifications and repairs will cost . approximately $253,000.00 and take 7 weeks to complete. This cost estimate includes the cost for exterior * containment and provisions to eliminate generating hazardous waste. I These cost estimates represent the current pricing structure. If you plan to proceed with the reconditioning I of this tank, in order to obtain more competitive bids, the project should be bid at least nine months prior to the . start date. .. The tank painting should be first inspected within the warranty period, and every three years thereafter. I In our opinion, if all the recommendations are followed and , the tank is inspected regularly, the new coating should last 15 to 20 years with only minor repairs. With proper , maintenance, the tank will provide many years of service. I 2.0 RECOMMENDATIONS , The photographs referred to in this section are in Appendix A. All drawings are found in Appendix B. The I surface preparation requirements for all repairs or neT" welding are described in Appendix C. The exterior and I interior paint chip lead test results are in Appendix D. I ,- i I I I - . . Page 4 .. City of Arden Hills, Minnesota AEC Project No. MN 1410 . 2.1 Interior structural . 2.1.1 On the interior of the tank, weld the roof manway, the vent and the dollar plate butt-joint . seams. See photo 2. I 2.1.2 Seal weld all bolted roof framing connections of the roof rafters at the center compression ring, . including the compression ring connections. After welding, remove all nuts and bolts. See II photos 3 and 4. Ie 2.1.3 At present the roof rafters are not connected to the tank shell. Install 24 gusset plates to connect the roof rafters to the shell to bring II the roof snow load capacity into conformance with current AWWA D-100 codes. See photos . 5 through 7, and AEC drawing SC#l. . 2.1. 4 In order to prevent rust streaks and corrosion, epoxy caulk the seam between the roof plate and ~ the shell stiffener angle. See photos 5 through 8. . 2.1.5 Remove all erection bracket scab marks below the . High Water Level (HWL) by air arc gouging, cutting torch, or grinding. There are I approximately 230 erection bracket scab marks. Repair the tank surface by welding or grinding. .. Grind off all weld spatter below the High Water . ~ .-..-..-- .~- ... _.~ --_._+".--- -'. ----..--. ----- I .. Page 5 City of Arden Hills, Minnesota AEC Project No. MN 1410 . . Level (HWL) . See photos 9 through 15. This work will require approximately 60 man hours. . 2.1.6 Remove the interior ladder on the dry well tube. - It has been ice damaged and is severely corroded in several critical locations. See photos 16, " 17 and 18. . 2.1. 7 Replace the two (2) , 20 and 24 inch round manhole gaskets. One is in the tank bowl area (20 inch diameter in the drywell access tube) . and the other is in the bottom of the wet riser. .. See photos 19 and 20. 2.1.8 Seal weld approximately three (3) lapped seams . on the interior of the wet riser. This is required by the AWWA DI00 Standard. . 2.1.9 Install two (2) vapor-proof lights in the tower . dry well tube interior. Place the wiring in code approved conduit. The current lighting . system does not illuminate the interior of the dry well access tube. See photo 19. Consideration should be given to upgrading the . current 60 amp electric service to 100 amp service and adding sufficient circuits and . outlets to provide power for maintenance and reconditioning. I. . . . .. Page 6 City of Arden Hills, Minnesota ABC Project No. MN 1410 . . 2.2 Interior Wet Coatina . 2.2.1 The interior coating above the HWL is in poor condition, because of age and deterioration and .. should be replaced within 1 to 2 years. See photos 2 through 7 and 21. . 2.2.2 The interior coating below the HWL is in good to . very good condition and requires only spot repair at visible coating failures within 1 to 2 years. See photos 9 through 18 and . 25 through 27. .. 2.2.3 After structural repairs are completed, the reservoir surfaces should be abrasive blasted . and the coating replaced or spot repaired with a light-colored polyamide epoxy system, similar to ., the Tnemec Series 20 Pota-pox Epoxy. . 2.3 Interior Drv coatina ~ 2.3.1 The interior coating on the non-sweating surface . areas is in good condition and requires only spot repair. After the recommended repairs, . this area should continue to provide service for an additional 8 to 10 years. ~ 2.3.2 The coating on the sweating areas of the .. interior dry (dry well tube, exterior of bowl . . . .. Page 7 City of Arden Hills, Minnesota . AEC Project No. MN 1410 . and exterior of the wet riser) are in only fair condition and are not repairable. The coating . in this area should be replaced concurrently with the interior wet. II 2.3.3 After structural repairs completed, the are . appropriate areas should be spot or completely abrasive blasted and the coating repaired with a . compatible alkyd coating and replaced with an epoxy coating similar to Tnemec Series 66. . 2.4 Exterior structural . 2.4.1 Replace the tank vent/finial with a 24-inch diameter, removable top, mushroom vent, similar . to the one shown on AEC drawing 6. See photo 26. The new vent and vent screen design . should meet AWWA 0100 .and local Health Department Regulations. The removable top will . improve ventilation and provide access to the tank interior during reconditioning. . 2.4.2 Install two (2) , 24-inch diameter, hinged roof . manways, approximately 180 degrees apart and located within 3 feet of the roof edge. This will provide conformance with OSHA Confined . Space Entry Requirements and additional ventilation during the interior surface . preparation and coating. See AEC drawing 7. .. . . . .. Page 8 City of Arden Hills, Minnesota AEC Project No. MN 1410 . . . 2.4.3 Install a separate aircraft warning obstruction light bracket next to the new roof vent and move . the light and conduit from the existing vent. See photo 27 and AEC drawing 8. .. 2.4.4 Install a new overflow pipe screen meeting . Health Department regulations. Use a corrosion resistant, heavy-gauge screen with a mesh size no smaller than #4 mesh. See photo 28. . 2.5 ExterIor coatinq . 2.5.1 Due to age, chalking, deterioration and lack of .. inter-coat adhesion the entire exterior coating should be removed and replaced within 1 to 2 . years with an epoxy/urethane coating system, similar to those manufactured by the Tnemec II company. See photos land 26 through 28. . 2.5.2 The exterior coating contains a low level of lead compounds, but is classified as lead based ~ paint. Removing it using conventional open air dry abrasive blasting methods may cause . environmental problems. Reconditioning specifications must be designed to comply with current environmental regulations including full . containment and provisions to eliminate generating hazardous waste. ~ .. . ~._.._.- -..__._-~ . . . Page 9 City of Arden Hills, Minnesota AEC Project No. MN 1410 I 2.6 Cathodic Protection System 2.6.1 The tower is not equipped with a cathodic , Protection system. 2.6.2 The Owner may wish to consider the installation r of a submerged C.P. system which is less susceptible to ice damage and easier to maintain ! than a conventional roof suspended system. I ,. t r I [ I I l. I I _. ~- Page 10 ---- City of Arden Hills, Minnesota .. AEC Project No. MN 1410 .. 3.0 ENGINEERING COST ESTIMATES 3.1 Interior structural repairs $ 15.250.00 II 3.2 Interior wet coating Type of coating - epoxy system $ 38.125.00 .. 3.3 Interior dry coating Type of coating - epoxy system $ 30.100.00 , 3.4 Exterior structural repairs $ 5.100.00 3.5 Exterior coating * , Type of coating - epoxy/urethane system $ 139.925.00 3.6 Engineering specifications and inspection fee $ 24.500.00 . 3.7 Estimated Total Cost $ 253.000.00 ~ 3.8 Estimated job duration 7 weeks. * Includes the cost of exterior containment. , Report submitted by: , AEC ENGINEERING, INC. 'hE~~ QI P esident , 7)~~ n-; 177';1. Date . Enclosures - Field Inspection Report - Appendix A - Appendix B I - Appendix C - Appendix 0 , IJ