HomeMy WebLinkAboutCCP 03-16-1993
- ARDEN HILLS CITY COUNCIL WORKSESSION MEETING
COUNCIL CHAMBERS
TUESDAY, MARCH 16,1993,4:30 P.M.
4:30 PM 1. CALL TO ORDERIROLL CALL.
2. AGENDA ADOPTION,
4:30 PM 3. UPDATE OF T.H, 51/SNELLING MEDIAN,
4:45 PM 4, WATER TOWER REPAIR.
5:00 PM 5, SIDEWALK SNOW REMOVAL POLICY RECOMMENDATION,
5:15 PM 6. CITY HALL RENTAL POLICY RECOMMENDATION,
5:30 PM 7, DISEASED TREE REMOVAL COST AND POLICY
RECOMMENDATION,
- 5:45 PM 8, ADMINISTRATOR REPORT:
a. Temporary Organization of Parks & Recreation Department.
b, Planning & Zoning Unit Procedure Update.
6:15 PM 9. COUNCIL COMMENTS,
6:30 PM 10, ADJOURN.
The above times may be subject to discussion of the issue,
-
-
- .
,
.
. CONSULTING ENGINEERS
Maier Stewart & Associates Inc.
March 9, 1993
File No: 520-030-10
Mr. Tom O'Keefe
Minnesota Department of Transportation
Room 705
Transportation Building
395 John Ireland Boulevard
St. Paul, MN 55115
RE: TRUNK HIGHWAY 5110LD SNELLING AVENUE INTERSECTION
IMPROVEMENTS
Dear Mr. O'Keefe:
This letter is intended as a summary of our phone conversation earlier today regarding me
above referenced project.
- The City has been told, on numerous occasions, that the construction of a signalized
intersection on Trunk Highway 51 to serve Old Snelling Avenue is a viable altemative that me
State would review and consider for financial participation. An outline of me local initiative
project development process was provided and discussed, with the City Council choosing to
move forward with preparation of a feasibility report and preliminary layout.
It is our understanding from you, however, that a difference of opinion exists between the
MnDOT Planning Section, who views the signalized intersection as a viable option, and the
MnDOT Traffic Section who may not view it as an option. We further understand that an
internal MnDOT meeting is set for March 25, 1993 for the Planning and Traffic Section to
further discuss tlris matter.
It is unfortunate mat the City has been told that a signalized intersection is an option, and tlJat
tlris was relayed to the numerous residents interested in tlris issue. The possibility of tlris work
was presented at an overflow-crowded meeting at City Hall on January 25, 1993. Another
public hearing to further discuss a possible signalized intersection will be held on March 29,
1993, The anticipated crowd at tlris meeting has forced the City to move the meeting location
to the Mounds View High School Cafeteria at 7:30 p.m.
We encourage MnDOT to determine once and for all, if the signalized intersection
improvements are an option that would be considered for financial participation. If at all
possible, we would ask that your internal meeting be held as soon as possible, to limit further
-
1959 SLOAN PLACE. SUITE 200, ST. PAUL, MINNESOTA 55117 612.n4-6021
9800 SHELARD PARKWAY, SUITE 102. MINNEAPOLIS, MINNESOTA 55441 612,546-0432 . Equal Opportunity Employer
,
.
-
-
.
- Mr. Tom O'Keefe
March 9, 1993
Page Two
City expenditure on this project. Should it be determined by MnDOT that a sigI1"H7Pd
intersection is not a viable alternative, we request that a MnDOT representative attend the
March 29, 1993 meeting to present tlris new information to the City Council and public.
Please contact me if you have any questions.
Sincerely,
MAIER STEWART & ASSOCIATES, INC.
~~#~
Mark J. Graham, P.E.
MJG:db
- cc: Ms. Doromy Person, City of Arden Hills
Mayor and City Council
Mr. Dan Winkel, City of Arden Hills
OJO-0901.mar
-
J
.
-
- CITY OJ!' 1lRDEN BILIS
HEH:'RANOOIl
morE: March 12, 1993
TO: DorotlIy Person, city l\dminist:rator
FRCH: Dan Winkel, Public Works SUperint.......st IJ. vJ
SUBJECT: Structure R"t"";1"S and PaintiDq Interior and Eld:erior of water
Tower on Fernwood Avenue
The city public works ereN discovered a rust problem inside of this tower
while doing routine maintenance early last year. In October of 1992 the city
authorized A.E.C Engineering to do a complete survey ani inspection of this
tower .
'Ihe tower was =iginally erected in 1968 ani has had only min= interior
painting done since that time. The exterior was last painted in 1981. 'Ihe
A.E.C. report indicates that it is definitely time to make major changes ani
updates to this tower. I have diSC"lSsoo this with other eI'Y,}ineers ani public
works superintendents who indicated that these kinds of repairs may be
. expected after a 25-year service life. In the future we will do a certiIied
inspection of both towers every three to five years.
'Ihe A.E.C. report describes interior ani exteri= concerns including that of
lead based paint. The interior wet coating above the high water nark ani
exterior dry coating need to be painted within the next one to two years.
Both of these areas currently have a lead based paint that should be removed
as soon as is possible. The interi= wet coating below the high water nark
ani also the interior dry coating need spot repair ani limited area
replacement within one to two years. The interior area below the high water
nark is not a lead based paint. Also, the interi= dry coating does not
appear to be a lead based paint. The entire exterior surface is a lead based
paint, ani should be replaced a=ding to Federal ani state regulations.
The report also indicates that there are structural repairs that also need to
be completed. We have some severe failure of some coated areas within the
interior bowl of the tower. Soo\e of the structure support steel may also have
to be replaced. During the inspection, a =nstruction deficiency was found,
where the roof rafters are not connected to the tank shell. 'Ihis definitely
needs to be =ected with the installation of gusset plates to connect the
two. 'Ihe inspection report also lists some interior options that should be
completed ani may help to extend the life of the tower SUPJXlrt structure ani
also the coated, or painted areas.
'Ihe exterior of the tower has a lead based paint ani needs to be removed using
a screen that would prevent paint from contaminating the surrounding areas.
- It was also recommended to add two hinged roof manways to comply with a.S.H.A.
confined space entry requirements. The aircraft warning light ani bracket
also need to be updated. A neN tank vent is also recomrnencled.
io- .
, ,
-
- .
- March 12, 1993
Page 2
'lbe tower does not have cathodic protection. 'lbe cost of a subnerged system
would be in the area of $7,000 - $8,000. I believe that with more freqUent
inspections to check for potential problems, that a cathodic protection would
not be J'l'=I'l.,n at this t:il!le.
'lbe A.E.C. report estimates that to repair all of interior ani exterior
structure problems ani suggested updates, including spot paintin:r of some of
the interior, ani paintin:r the entire exterior, the cost could be
a~tely $253,000. To completely sandblast ani paint the entire interior
of the tower would add an estimated $48,000 to this project. '!he total then
would be approximately $300,000.
'!he 1993 water bJdget includes $125,000 for the interior stIucture repairs ani
also paintin:r the interior of the bowl within the tower. I have discussed
this with City Ao:ountant Terry Post, who stated that the cu=ent water fund
is still payin:r for the new water tower, ani may not be able to ~t all of
the estimated repair costs for the old tower.
Additional funding will be needed from the P.I.R. account, or another source
if we are to do all of the interior structural repairs. However, after
reviewin:r the A.E.C. report it would be my recomrnerx:lation that we look at
doin:r the entire project all at one t:il!le. Though the City would have lower
. costs this year, we would then have to pay additional engineer fees,
contractor m:>bilization fees, ani an additional down t:il!le for the tower next
year. If the financin:r can be approved this year we should proceed to do the
entire project this fall. '!he bids could be let this sprin:r, with completion
of work in the fall.
Pat Arlin:r from M.S.A. ani I will be at the March 16 Council worksession to
answer any additional questions.
DAN: 11
-
c: \~1\doc\dan\fet'fJ.l.dt,...1lIDO
'-' F' _ 0,1
-
- "'lri/,I.:Ir/'/M;i~;'St~;;:;t&A~:~~;:::~~~~'
I .
I
i MRMO
I
I
I
DATE: March n. 1993
I TO: Honorable Mayor and City Council Members
Aroen Hills ' .
I Patricia A. Arli~, P,E. ~~
i
i FROM:
SUBJECT: Water Tower Repairs
Femwood A Ventle Water Tower
52Q-027-00
.__..........--..............'=''''"............,...,..'''.........,........._._~-.,.------ ---- __...~_...._..:v"o._:"'F ....... .___
. In Iuly, 1991, Braun Intertec completed all inspection of \hl) F(ll11Wood Avenue Water
Tower. They submitted photograpbs and a brief report recolnmending that further stt1dy of
the structural cOndition inside the tank be compl~, A float down inspection of the tank
was completed by AEC Enginccring On CXtober 6, 1992. ^ report including their findings
a.nd recommendations was S\lbmitte4 in ~ember. 1992.
The report includes recommendatillJ'lS for repair, modifications and painting. Dan Winkel
and I arc attending the March 16th mretiog to answer questions regarding the rec(lmmcO(I~
water tower structural rehabilitation and plIinting.
The work recommended is estimated to cost nt'.arly $300,000, This work could be divided
into a two year PT(1jt:Ct; Slruclw..l rcpfiirs and interior painting during the first year and
exterior painting on the second year. This approach would mean a lower expenditure fOT
the City this y~r. However, it is estimatoo t1iat the total project cost would be lower if the
entire project is bid and completed in one year, (Reducf'.d mobili7.ation, bonding, etc. costs
for cOlltraCIQr.)
I In order to complete the illlerior worj( in 1993 and to obtain competitive bids, we ,
I
i recommend a schc.dule which requires council approval now, MSA 00\111;1 begin in March
I
! to prepare spt:Cifications and contract documents for distribution in May. and bid in June.
Work would commence in Angust or Septf.mbcr dcpending on tile weather and the Col1tracior
.
, workload, ,
- I
I
We r<,.commend that the d(ICumcnts be prepared to include both interior work and exterior
painting. Thc cxterior work could be bid as an alternate. .
- '959 SLOAN PLACE. SUITE 200. ST. PA\,JL. MINNESOTA 55117 6'2.714-6021 .
, I 9800 SH€l.AAD PARKWAY. SUirE 102. MIN"CAPOLIS. MINNESOTA .S441 612.546-D43? . EQual Oppor1unlty Empley~
.
-
- .
Memo; Femwood Avenue Water Tower .;.
- March ll, 1993
Page Two
We also recommend that l!1e entire interior coatj,lg including the wet area under the normal
water line be completely redone at this time. (Spot repairs are necessary a~~ording to the
ABC report.) Removal of all interior )i,>.ad based paint would thel] be accomplished.
There are two additional factors to c.onsider whcn deciding Oil lhe proj/X'I !;Chedulc:
1. The MPCA is in l!1e process of draftil1g nltes for removal and dispowl of lead based
paint. AllIlliugh major changes in the rules are not anticipated. allY r~quired changes
in procedure or disposal requirements could increase the costs of the project.
2. Current specifications include NJcs which prevent sandblasting in high wind
. .
conditions. This restriction can. create sched\IJe problems for contrdctors. If both
inside and outside work arc included in the s;une year, the cOntractor can col1tinu~
work inside the Uink on windy days and remain within, the project scl1e<1ule, (We
anticipat.e this would alw be reflected as a reduction in the total project COSt.)
-
- 5201{t?'.H.Ij,H ~
'-
-
f
CITY OF ARDEN HILLS
MDDl>>lOOM
-
ro: ~AND~
FRCM: JXIlOl'HY A. PERSCIl', CITY AJ:ImIIS'1llATC
Dl\TE: lmRCB 12, 1993
SUBJECT: S:II>EHM.K S!Uf lUXNAL
Based on the attached memo, the question to the Council is a service provision
issue. If the eouncil chooses to provide sidewalk snow removal in Arden
Hills, I make the following recommendation:
'Ihat the eouncil advise staff to seek a service a:mtract with
a neighboring City. 'lhis then provides a time period to ensure
the =nnuni.ty need remains and if so, to consider the plarming
for the capital inprovement funding.
DAP:rk
-
-
- CITY OF .l\RDEN HILLS
HIHIU\NOOM
DM'E: January 14, 1993
TO: Dorothy Person, city ~in;"'trator
Dan wi.nkeJ., Public works SUperint~""lt .,
FIlCH: I 4w
. ' , ~
_. .
SUBJECT: update on Sidewalk Cl~ InfODlllltion
The City of Arden Hills has approximately three miles of public sidewalks.
'lhese include the west side of both Lexington Avenue and Hamline Avenue from
Highway 96 to County Road F, and also County Road E fran Lexington Avenue to
SIlellin:J Avenue - both sides of the road. '!he Parks Trails consist of about
five miles. The average width varies fram six to nine feet f= all of these
walkways.
I have contacted various landscapin:J CCll1p1mies to solicit prices for cleaning
the public sidewalks. Commercial I.aOOscape is tryin] to view the sites and
- offer a price. Birch Ia'WIl Care does not have the proper equipnent and is not
interested. Collander's I.aOOscape will also try to inspect sites and forward
a price.
I have also talked to Sh=eview, Roseville, and New Brighton representatives.
All three of these cities are currently plowin] and maintaining city walkways
and paths. Shoreview has agreed to plow our sidewalk on r.exi.ngton Avenue fram
Highway 96 to County Road F. '!he estimated cost for each occurrence should be
between $25 and $35. '!he cost could go up with more extreme weather and snow
conditions. 'Ihe quoted price is for a nonnal 2"-4" snowfall, and does not
include return trips to clean up each time that the county plows Lexington and
deposits snow back on the sidewalk. Three years ago Shoreview purchased a
special aU-wheel drive machine that is used specifically to maintain
walkways. 'lhe machine cost about $40,000 with attachments. Today the same
machine would cost between $50,000 - $60,000. '!he attachments include a
6-foot wide vee-plow, snowblower, and sweeper. 'lhe vee-plow is used f=
nonral, 2"-4" snowfalls. '!he blower is used for any heavier conditions.
Shoreview has approxbnately 40 miles of walkways to maintain. Under nonnal
conditions usin:J the vee-plow, the walks can be cleaned in about ten hours.
If the snowblower has to be used, the process may take two - three t:i1nes
longer . Shoreview stated that they may be willin] to :f!roVide plowin] service
f= Lexington Avenue, but probably not the rest of the walkways.
New Brighton has two different machines that they use. Both are similar to
Shoreview's and cost between $45,000 and $50,000. New Brighton cleans about
11 miles of walkways. If toth machines are available to use, the project
- takes about four hours. New Brighton was not interested in cleanin] our
walkways. '!he Public W=ks Superintendent stated that they could not
guarantee service in a timely manner.
Roseville also has a machine similar to Sh=eview' s and maintains
approxbnately 30 - 35 miles of sidewalks and walkways. Roseville does not pay
.
- Page 2
update on sidewalk Cleanin3' Information
overtime to clean sidewalks, so the normal cleanin3' for them takes two or
three days.
All three of the cities contacte:i described the same conclitions am.
circumstances that are encountered when keeping the sidewalks clean. The
specific attachments all have limitations am. should be used for certain
corrlitions. The vee-plow works best for nonnal conclitions, am. is the fastest
way to clean the walkways. The snowblcmers are used for heavier corrlitions
am. the process will take much longer. The blower also causes many residents
to call am. c:anplain about sncM blown onto their yards. Another CXlllllOOI1
concern voiced by all three cities is that the sidewalks never seem to be
clean. Every time the city plows or the County plows go by, the sidewalks
need to be cleaned again. All three cities voiced some frustration trying to
keep the walkways as clean as possible. The positive side is that by cleanin3'
the walkways, the residents will have a clean walk that can be used for
walking or jogging am. it provides for this activity to take place off the
roadway, where walking or jogging could be much more dangeroUs.
Same of the =ent equipment that we have could possibly be used. We did
. clean a short section of Lexington Avenue last week using the Massey-Ferguson
tractor. The bucket is a-feet wide am. was used to push snow the best way
possible. I contacted L - Z Company, who stated that they !'lOW have a 9-foot
vee-plow that they could attach to the front bucket of this machine for
$2,350. This may work when cleanin3' most of the current walkways am. trails
that we have. The smaller sidewalks of COunty Road E lNOIlld be a little
tougher to do. A Bobcat loader could be purchased with all of the attachments
for $35,000 to $40,000. This smaller size machine lNOIlld work much better for
all of our applications. The machine could also be used during the rest of
the year for many other functions. The larger size Massey tractor would have
some difficulty cleanin3' the Parks Trails until we could do some tree
trilllming . The current machines that the other three cities are using cost in
the range of $50,000 - $60,000. It should also be noted that we have
corrlitions in some areas where the snow would actually have to be reIroVed and
hauled away due to the lack of storage space. 'Ihese areas are prilllarily along
Hamline Avenue, where we have a short distance between the back of the =b
and retaining walls that were constructe:i to maintain the integrity of the
local properties. This would be a labor intensive activity that would take a
little longer to camplete.
I will be available at the council work session if lOClre questions should o::nne
up.
IM/kl
-
~
crrY OF lIRDEN HILLS
-
MEKIWlDtIM
.
'1'0: !Grn1'I. 100) ~
FRCH: DCIlODlY A. PERSCII', crrY 1\I:MIllISTRl\T
DM'E: MMCII 12, 1993
stlBJ]lX:T: REVIEW 100) RECXHa:NDM'I<>>l' OF :RENrAL OF crrY ImLL
As an update to our previous nic:r'llSsions on rental of the City Hall
facilities, I nake the follOlr/IDq recamnendation:
crrY ImLL RENrAL
'!he Arden Hills city Hall facilities are available for rental to other
Governmental entities. 'Ihe rental cost will be calculated at $10.00 per hour.
'!he fee is base:l. on the need to provide l::uilding security with a City employee
in attendance. '!he City Hall is available between the hours of 6:00 pm -
10:00 pm.
DAP:rk
.
.
c:ITl! OF ARDEN BILIS
HEH:IWlOOM
. TO: MMCR .l\ND ~
FRa(: IXR:7mY A. PERSCIi/, c:ITl! ArIIIN:IS'.l'RA
DATE: MARCIl 12, 1993
SUBJECT: Water Rates
Durin;J the last several days, the City was notified by Roseville through our
A=untant that the water rates would incr:ease 20% (5% was I::udgeted) . 'Ibis
was the first infonration given to us, with the rates effective 1-1-93. 'Ihe
city of Roseville has been attempting to address this increase to the city of
st. Paul, with no success.
Ten:y Post will have further information and evaluation at the Council
Worksession on 'Iuesday.
.
.
~ j Lc./
{.
/:,il/ i' '/';
,- " ~_. '-"'" ...~. '-',-'
/1 . ,(1 ,v
March IS, 1993 t,. ;,k
f't
. U
To: Tom Sather. Mayor of the City of Arden Hills
Council Members:
Beverly Aplikowski
Dale Hicks
Paul Malone
Dennis Probst
Subject: RV Ordinance
The last proposed ordinance. which was presented to the citizens during a meeting with
the Planning Commi....ion. still is not a fair ordinance.
In my case. as owner of a 34' motorhome. the ordinance would call for a Special Use
Permit. This is costly and, I understand. difficult to obtain, but. whether obtained or
not. it requires a great deal of effort on the part of a number of people. I feel that this
requirement is unnecessary. I feel it demonstrates harassment.
The recommendation of a Variance would demonstrate a more fair attitude and would
accomplish the same results with far less effort and expense.
. Enclosed is a petition signed by all of my neighbors on both sides of the street of the
block where I live. You will see that my neighbors have no problem with my parking
my motorhome in my south side-yard, as I have for five years.
Furthermore. I strongly recommend that the discriminatory reference to length be
stricken completely because all motorhomes are approximately the same height and
width (give or take a few inches) and the length really doesn't have anything to do with
it.
I have reviewed the list of complaints since 1988 and those complaints do not reflect any
~ problem with the parking of RVs. So, I would like answers to questions previously
posed by people attending the two previous meetings with the Planning C(lmmi....ion.
1. How did the desire to place further restrictions on RV parking on ones
own property come to light?
2. Has there been a legitimate complaint? H so. what were the
circumstances? How was it bandied? Why wasn't it resolved under a
nuisance ordinance?
3. Why should Arden Hills bave such a restrictive and unfair ordinance - an
ordinance so harsh and so much more restrictive than the ordinances in
- neighboring communities.
. Pa&e Two
The proposed ordinance portrays an arropnt, dictatorial exhibition of power, without
consideration for the real effect of such restrictions on a Jal'l!e Dllmber of people.
There are variables offered in the proposed ordinance for Iakeshore property owners
due to lot confIgurations, topography, etc. However, no variables are offered to the
non-shore property owners with lot conf'lgI1I'Iltions and topographies mlllcing it
impossible to meet the proposed specirlcations.
As I have stated before, it is simply not practical to store very expensive motorhomes,
trailers and boats away from one's care and protection. It's expensive, too. Apartment
dwellers have a different set of problems.
We, the citizens of Arden Hills, make up the City and the City is a reflection of manner
in which we keep our homes, yards, gardens, recreations equipment, etc.
Let's be realistic and come up with an ordinance that works for all people rather than
satisfying the imagination of a few.
~~
. f02.9 ~L2.eu.,
.
. .
. PETITION TO THE CITY COUNCIL OF ARDEN HILLS. MINNESOTA
PARKING MOTORHOME ON MY PROPERTY
JAMES D. ROSS
4029 NORTH FAIRVIEW AVENUE
ARDENHTJ.T.~, MN
633-6005
We bave no objections to (and we feel there is no problems with) the Ross family
parking their motomome on the south side-yard of the lot at 4029 North Fairview
A venue. This motorhome bas been parked there regularly since 1988 and has created
no problems.
DATE NAME ADDRESS PHONE
. /' -j", .. c. , ! ;s:> .
. .4Z
'). -/ L -
, -1, . -.;..-(....."<--..--"
'" ,<,,;!.5?,A/ ~/. 5:;'{./5-
G\---- 110ft ~1l.1/1 (;'V # AI. 615'- '10)?