Loading...
HomeMy WebLinkAbout06-10-24-SWSMayor: Address: David Grantlt 1245 W Highway 96 Arden Hills MN 55112 HILLS Councilmembers: ,-A EN Phone: Brenda Holden 651-792-7800 Emily Rousseau Special City Council Tena Monson Website: Tom Fabel Work Session Agenda www.cityofardenhills.org June 10, 2024 5:00 p.m. City Hall City Vision Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long-standing tradition as a desirable City in which to live, work, and play. Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City's website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills. https://cityofardenhills.orci/320/Watch- City-Meetings This meeting will be streamed live on local Cable Channel 16 and available for playback on our website. CALL TO ORDER 1. PUBLIC INQUIRIES/INFORMATIONAL This is an opportunity for citizens to respectfully bring to the Council's attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting. 2. RESPONSE TO PUBLIC INQUIRIES 3. AGENDA ITEMS 3.A. 4293 And 4295 Lexington Avenue Concept Plan Review Megan Rogers, Larkin Hoffman Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF 3.13. Highway 96/TH 10 Corridor Landscaping And Irrigation Maintenance Lucas Miller, Assistant Public Works Director Documents: MEMO.PDF ATTACHMENT A.PDF 3.C. 2025 Park Improvement Project Lucas Miller, Assistant Public Works Director Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF ATTACHMENT E.PDF ATTACHMENT F.PDF 3.D. Spring Lake Park Lions Club Donation Discussion David Swearingen, Public Works Director/City Engineer Documents: MEMO.PDF 3.E. Council Code Of Conduct Dave Perrault, City Administrator Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 3.F. Strategic Planning Discussion Follow -Up Dave Perrault, City Administrator Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 3.G. Rice Creek Commons/TCAAP Discussion Dave Perrault, City Administrator Documents: MEMO.PDF 3.H. Agenda Planning Dave Perrault, City Administrator Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 4. COUNCIL/STAFF COMMENTS ADJOURN AGENDA ITEM - 3A ,-ARZEN HILLS MEMORANDUM DATE: June 10, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Jessica Jagoe, Community Development Director SUBJECT: Planning Case 24-013 — Concept Plan Review Larkin Hoffinan — 4293 & 4295 Lexington Avenue Budgeted Amount: Actual Amount: Funding Source: Council Should Consider Council should consider a request for a Concept Plan Review for a proposed School and House of Worship at 4293 and 4295 Lexington Avenue ("Subject Property"). The Applicant is seeking feedback from the City Council on the concept plan in advance of the full submission which would include a land use application for items such as a Zoning Code Amendment, Conditional Use Permit, Planned Unit Development Amendment, and Site Plan Review. The Concept Plan Review process is an opportunity for the City Council to provide comments and questions regarding proposed developments. A concept review is considered advisory and is nonbinding to the City and Applicant (Section 1320.14, Subd 4 of the Zoning Code). No formal action can be taken at a Work Session. A formal application will be subject to the full review process, including a public hearing with Planning Commission and City Council review. Background Larkin Hoffinan represents a local school and worship center ("School") that is proposing to redevelop the existing industrial/office buildings on the Subject Property. The property is zoned I-1, Limited Industrial, which does not allow for school or house of worship land uses. The Subject Property is part of a Master Planned Unit Development (PUD) that was approved in 2017 for the properties at 4255, 4265, 4293, and 4295 Lexington Avenue. These four lots were created through subdivisions granted by the City in 1995 and 1999. There are a total of four existing buildings on the site, with the buildings at 4293 and 4295 Lexington Avenue N. sharing a common wall. The PUD development functions as a single entity with the four lots sharing common access driveways, utilities, stormwater management, and parking. The Applicant would be proposing to redevelop the northern two buildings. Page 1 of 4 In addition, the City has a Permanent Parking and Access Easement for Cummings Park that was filed on January 7, 1997. This easement grants the City permanent non-exclusive rights to ingress and egress over portions of land within this PUD Development as well as parking spaces for utilization in conjunction with the adjacent City park. Discussion The Applicant is proposing to redevelop the northern two existing industrial/office buildings on the site. The proposed project would utilize the existing spaces without altering the exterior of the buildings. In their narrative, the Applicant has stated that the School will serve PreK through 12th grade with an initial enrollment of 400 students. Their plan would be to grow to 800 students within the first five years. The site access diagram included with the concept review narrative indicated that there would be "walk in" access between the buildings at 4255 and 4265 Lexington Avenue (i.e. two southern buildings adjacent to Cummings Park Drive) as shown with a blue arrow. However, the Property Owner has stated that all pick-up and drop-off activity for the proposed uses would need to take place from the westerly access and parking area. There are two access points to the properties under the PUD from Cummings Park Drive. Page 2 of 4 Information was included for the concept review on the current staffing ratio for the School. The Applicant has not provided detail on typical hours or other activities that might take place for the school and/or house of worship land uses. The narrative notes that the site features an outdoor courtyard that could be used as an outdoor classroom or lunch area and that the 4295 building could be converted for athletic facilities. During the initial discussion with the Applicant prior to their submittal for the concept review, it was stated that this location is attractive because of the proximity to Cummings Park for use of the playground, outdoor athletic court/field, and amenities. For this proposal, the Applicant has stated there would be no changes to the current site layout. At this stage, they're seeking feedback as part of the concept review on the proposed land uses and text amendment that would be necessary in the I-1 Zoning District. Given the preliminary nature of the discussion, the Applicant has not provided information on site circulation, traffic generation, or plans for other on -site outdoor amenities that are typical of a School. A change in use or modification to the site circulation/layout would need to take into consideration potential impacts to all four buildings under the PUD. Comprehensive Plan The Subject Property is guided as Light Industrial and Office (IND) in the Arden Hills 2040 Comprehensive Plan Land Use Chapter. The area is designated for a broad range of light industrial uses such as manufacturing, processing, and warehousing. This land use designation may also include offices. The expected share of uses within this area are as follows: 50% to 100% Light Industrial and 0% to 100% Office. A Development intensity of up to 0.8 FAR may be allowed. According to the Comprehensive Plan the total area of the IND is 346 acres, or 5.7% of the total land area in the City. The existing land use for the Subject Property is Office and Industrial. Zoning District Land Uses The Subject Property is within the I-1, Limited Industrial Zoning District. The purposes of this district are: A. To allow only those types and intensities of industrial uses that do not detract from the surrounding area. B. To maintain performance standards to keep the intensity of land utilization lower than in the general Industrial District. As part of the concept review, the Applicant is requesting feedback on a text amendment to the I- 1 Zoning District to allow a School, General Education and House of Worship as a Conditional Use. R-1 R-2 R�3 R4 NB B-1 B-2 B-3 B-4 CC GB 1-1 !-2 i- FLEX CO PCs 1HST House of C C G C G C C C C C v.orship Scillool, G C G G =_ __ __ __ _= C general education The City Attorney as part of this concept review has provided information for the City Council to consider for regulating religious land uses (Attachment Q. Page 3 of 4 Parking The Applicant is proposing to utilize the existing parking within the PUD. Through the PUD approval in 2017, the Subject Property was granted flexibility to allow the parking area to encroach within the five-foot setback from the side property line and for the number of required off-street parking spaces. Based on the uses in 2017, the properties required 618 parking stalls and were approved for installation of 591 parking stalls. The requirements for off-street parking for the proposed uses would be: • Churches and other Places of Assembly to provide one (1) parking space for every three (3) seats, based on design capacity. • Schools, Elementary and Middle School to provide one (1) parking space for each staff member plus three (3) per classroom. • Schools, Secondary to provide one (1) for each school employee plus one (1) space per four (4) students. For the concept review, the Applicant has not provided the level of detail needed for staff to calculate the off-street parking requirements for the School or the cumulative of all of the land uses within the four buildings to verify the capacity of shared parking under the PUD. Concept Review With the intent of this application only to seek initial feedback from the City Council on the proposed concept, the Applicant has not finalized all of the details in their development planning. The Applicant would be required to submit all of the requirements as referenced in the ordinance as part of a future land use application. Based on an initial review, staff believes the proposal would require the following land use requests: • Zoning Code Amendment to allow Schools and House of Worship in the I-1 Zoning District • Conditional Use Permit for House of Worship • Conditional Use Permit for School, General Education • Site Plan Review • Planned Unit Development Amendment Budget Impact N/A Attachments A. Land Use Application & Narrative B. Location Map C. City Attorney Memo Page 4 of 4 Attachment A -AR HILLS 1245 West Highway 96 Arden Hills, Minnesota 55112 Telephone (651) 792-7800 Fax (651) 634-5137 www.cityofardenhills.org Planning Case No. 24- Submittal Date Application Completed Date Accepted by Receipt Number Council Decision Council Decision Date 2024 LAND USE APPLICATION Applicant Information Applicant: Megan Rogers, Larkin Hoffman Address: 8300 Norman Center Drive, Minneapolis, MN 55437 Telephone No.: 952-896-3395 Other: Fax No.: Email Address: mrogers@larkinhoffman.com Property Information Property Owner: PNL Invest, LLC, a Delaware limited liability company Owner Address: 500 N Akard St. Ste. 2800 Dallas, TX 75201 Owner Telephone No. 612-619-8531 Other: Address of Property Involved: 4293 and 4295 Lexington Avenue North I Description: Please see attached Property ID No.: 223023410015 and 2203023410018 Tvpe of Use: School and Place of Zone: 1-1 Property Acreage: Total 10.46 Acres Type of Request ❑ Comprehensive Plan Amendment (Fee: $550 + Escrow: $2,500) ❑ Conditional Use or Interim Use Permit/CUP or IUP Amendment (Fee: $400 + Escrow: $1,500) ❑ Preliminary Plat (Fee: $500 + Escrow: $2,500) ❑ Final Plat (Fee: $450 + Escrow: $1,000) ® Concept Plan Review (Fee: $300 + Escrow: $750) ❑ Master Planned Unit Development or Master Special Development Plan (Fee: $600 + Escrow: $2,500) ❑ Final Planned Unit Development or Final Special Development Plan (Fee: $350 + Escrow: $2,000) ❑ Planned Unit Development Amendment or Special Develo ment Plan Amendment (Fee: $400 + Escrow: $1,5g ❑ Site Plan Review (Fee: $450 + Escrow: $1,500) ❑ Rezoning or TCAAP Regulating Plan Amendment (Fee: $500 + Escrow: $1,500) ❑ Zoning Code or TCAAP Redevelopment Code Amendment (Fee: $400 + Escrow: $1,500) ❑ City Code Amendment (Fee: $350 + Escrow: $1,500) ❑ Lot Split/Minor Subdivision (R-1 and R-2 Districts Only) (Fee: $350 + Escrow: $1,500) ❑ Variance or Permitted Adjustment (Fee: $350 + Escrow: $1,000) ❑ Vacation of Easement or Right -of -Way (Fee: $150 + Escrow: $1,000) ❑ Appeal of Administrative Decision (Fee: $150 + Escrow: $1,000) ❑ Land Use Requests — Not Already Specified (Fee: $150 + Escrow: $1,000 Page 1 of 3 Brief Description of Request Please see attached narrative *IMPORTANT* • Certain applications are subject to review and approval by the Rice Creek Watershed District. Contact RCWD directly at 763-398-3070 for additional information. • The land use application fees do not cover building, sign, or other permit fees that may be required upon approval of a land use application. • All applications will be subject to additional fees for reimbursement of consultant costs associated with filing, reviewing, and processing of application in the form of an escrow to the City. Filing & Information Requirements The City requests that you make a pre -application meeting with the Community Development Director to discuss the application process, requirements, and deadlines. Unless waived by the Community Development Director or Planning Commission, a certified survey of the property is required for all applications. A checklist with additional application requirements can be found at www.citvofardenhills.org/landuseapplications. Complete/Incomplete Applications Under Minnesota Statute, Chapter 15.99, cities have 15 business days to review all plans and application materials to ensure they satisfy City requirements. During the 15 day review period, planning staff will provide written comments on the application and may request plan revisions. If the application is determined to be complete, Minnesota State Statute then requires the City to approve or deny the application within 60 days, up to 120 days. If not complete, the City may require plan revisions and/or additional information before the application is scheduled for Planning Commission review and/or City Council action. Project will not be scheduled for any meeting until the application submittal is found to be complete by the Community Development Director. Payment of Fees and Escrows The undersigned acknowledges that she/he understands that before a land use application can be deemed complete, all required fees and escrows must be paid to the City. The applicant is responsible for all costs incurred by the City related to the processing of this application. Each separate land use request shall be charged a separate administrative fee and escrow even if submitted on the same application. Costs expended in reviewing and processing an application will be charged against the cash escrow and credited to the City. Charges to the escrow may include planning and engineering staff time, City Attorney and consulting fees, and mailing costs. If, at any time, a required cash escrow is depleted to less than 20 percent of its original amount, the applicant shall deposit additional funds in the cash escrow account as determined by the City. The City may withhold final action on a land use application, withhold building permits, and/or rescind prior action until all fees have been paid. Unused portions of an escrow are returned to the applicant upon successful implementation of an approved plan. The escrow may be reduced or increased by the Community Development Director on a project by project basis. Notice of Meeting Attendance In order for the Planning Commission and the City Council to consider any application, the applicant or a designated representative must be present at the scheduled meeting. If not, the matter may be tabled until the next available agenda. Page 2 of 3 Meeting Schedule Planning Commission meetings are typically held on the first Wednesday after the first Monday of each month at 6:30 PM, though please contact City Hall to verify the meeting date and time. City Council meetings are held typically the last Monday of the same month at 7:00 PM. Meetings are held in the Council Chambers at the City of Arden Hills, 1245 West Highway 96, Arden Hills, Minnesota 55112, unless otherwise stated. The schedules below are for reference purposes only. Project will not be scheduled for any meeting until the application submittal is found to be complete by the Community Development Director. 2024 Planning Commission and City Council Schedule (*subject to change) TENTATIVE PLANNING COMMISSION MEETING DATE* (Generally held on the first Wednesday after the first Monday at 6:30 p.m. TENTATIVE CITY COUNCIL MEETING DATE* (Generally held on the fourth Monday at 7:00 p.m.) DEADLINE FOR LAND USE APPLICATION SUBMISSION (1st day of the preceding month) January 3 February 12 December 1 2023 February 7 March 11 January 2 March 6 April 8 February 1 April 3 April 22 March 1 May 8 May 27* April June 5 June 24 May 1 July 10 rescheduled date July 22 June 3 August 7 August 26 July 1 September 4 September 23 August 1 October 9 October 28 September 2 November 6 November 25 October 1 December 4 January 13 (2025) November 1 Acknowledgement and Signature I hereby apply for the above consideration and declare that the information and materials submitted with this application are complete and accurate per city code and ordinance requirements. I fully understand that I am responsible for all costs incurred by the City related to the processing of this application. Property Owner Signature (Required) Docu5igned by: EC. K6" AAEE551859C3495... Applicant Signature (If different than the property owner) Date 5/23/2024 Date Please contact the Community Development Director at 651-792-7800 if you have any questions regarding this application. Additional copies of this application form are available on the City's website: www.citvofardenhills.orp/landuseapplications Page 3 of 3 IA Larkin Hoffman May 23, 2024 8300 Norman Center Drive Suite 1000 Minneapolis, MN 55437-1060 General: 952-835-3800 Fax: 952-896-3333 www.larkinhoffman.com City of Arden Hills Via Email Attn: Jessica Jagoe, Community Development Director jjagoe@cityofardenhills.org 1245 West Highway 96 Arden Hills, MN 55112 Re: School and House of Worship- 4293 and 4295 Lexington Avenue North Dear Ms. Jagoe: We represent a local school and worship center (the "School"). The School desires to develop a new pre-k through12 day school and house of worship at an existing industrial building located at 4293 and 4295 Lexington Avenue North (the "Property") in the City of Arden Hills ("City"). Reuse of the Property for the proposed use (the "Project") requires the following applications: • Zoning Text Amendment (ZTA) to allow schools and worship centers in the 1-1 District • Conditional Use Permit for House of Worship • Conditional Use Permit School, general education • Site Plan Review (collectively, the "Application") Before investing further in detailed design and planning, the School desires to receive feedback from staff and the City Council through the Concept Plan review process. Our objectives are: 1) revitalize an existing industrial park, 2) utilize the existing space without altering the exterior of the buildings or impacting surrounding office uses, 3) implement a phased approach to School expansion, ensuring gradual integration into the community, and 4) foster community engagement and address concerns of Council members and residents through transparent communication and collaboration. The School hopes to gain a holistic assessment of whether the Project aligns with the Council's vision for the City. We believe that this is a creative project that will reinvigorate existing buildings and bring a new community partner and resource Arden Hills. 1. Project Summary The Projects seeks to repurpose an existing industrial building into a school and associated house of worship. School and religious uses are currently conditional uses within the City's residential districts. Uniquely for an industrial parcel within the City, the Property is bordered by residential uses to its west and Cummings Park to the north. While there are significant entitlement hurdles presented by the constructive reuse of the Property, we believe that this initiative directly aligns with Arden Hills' commitment to develop and maintain a land use pattern that strengthens the vitality, quality, and character of residential neighborhoods, commercial districts, and industrial areas while protecting the community's natural resources. May 23, 2024 Pate 2 a. The Property uniquely meets the needs of the applicant with many of the characteristics sought after for development of a school. Adjacent to the City's Wyncrest neighborhood, the Project seeks to address the need for accessible educational and spiritual facilities while reinvigorating an existing industrial building within the community. The unique layout of Property within the existing office complex allows for the school and church to function in concert with the surround office uses while integrating a new use that is also consistent with the character of the surrounding neighborhood. b. Serving the City and its Community are at the heart of the School's mission. The School's mission is to encourage the next generation of students to live in faith, build moral character and leadership and while encouraging a strong sense of social responsibility. Graduates engage in the regular rhythms of prayer, worship, reflection and study that sustain one's spiritual life. School curriculum requires students to serve people in need beyond their community and provides the opportunity to reflect on the spiritual benefits of being responsible to and for others. Students are not only challenged academically but are driven to engage in global challenges from a religious perspective. Students mature in their relationship with God in a rigorous academic environment and grow to understand role of religion and spirituality in our complex world. Investment in and reuse of the Property will allow the School to function on one campus, and the benefits of a single campus are significant. Having all grade levels on one campus allows for a cohesive educational experience from early childhood through adolescence. This continuity can facilitate smoother transitions between grade levels, fostering a sense of community and shared purpose among students, teachers, and families. Consolidating resources such as facilities, staff expertise, and support services can lead to more efficient operations and cost savings. For example, specialized facilities like science labs, sports facilities, and libraries can be shared among different grade levels, maximizing their utilization. Older students can serve as role models and mentors for younger ones, fostering leadership skills and a sense of responsibility, while younger students may benefit from interacting with older peers and learning from their experiences. Similarly, the single -campus model can facilitate the implementation of a holistic approach to education that considers students' developmental needs across different age groups. Educators can coordinate curriculum, teaching methodologies, and support services more effectively to address the diverse needs of students at various stages of their educational journey. A one -campus approach also meaningfully supports our families- having all children in the same location can simplify logistics for families, reducing the challenges associated with transporting children to multiple campuses for drop-off, pick-up, and extracurricular activities. May 23, 2024 2. Property Description and Background The Property consists of two parcels within the Arden Hills Corporate Center (the "Center") located off Lexington Avenue just north of the Boston Scientific corporate campus. The Center is 16.6 acres and is made up of four parcels. Each parcel includes a building, access rights and dedicated parking. The buildings at 4293 and 4295 have historically served individual tenants but have a shared common wall. The Center is subject to a Master Planned Unit Development (MPUD) f approved by the City in 2017. The � r Property and the Center are zoned 1-1- Limited Industrial District and guided for �' L Light Industrial and Office use. The MPUD governs the site plan - # ­; = including parking allocation between . r �```'`'�"'�' I:11 IJ is the parcels and stormwater at the Center. While we originally proposed rezoning the Property to I -Flex where schools are a conditional use, because the MPUD impacts all four buildings, rezoning would trigger a significant MPUD amendment and potentially require the 4255 and 4265 buildings limit their uses to those permitted within the I -Flex District. For this reason, we are interested in pursuing a text amendment to the 1-1 District to conditionally allow for school and religious uses at the Property subject to use performance standards. No exterior changes to the Property are proposed. The current tenants of both buildings have elected not to renew their leases at this time. The School has entered into a non-exclusive letter of intent in order to conduct initial due diligence on the building and seek guidance from the City. Like many single purpose structures, office and industrial buildings can sometimes seem like challenging candidates for adaptive reuse. Although not every industrial or office space is suited for reuse or transition to an educational environment, this facility is uniquely compatible with the proposed interior redesign. Private schools, as a subset of the institutional real estate market, face significant challenges in finding available space for either new construction or conversion within the metro area. Schools risk losing enrollment if they relocate far from established facilities. The Property is served by significant parking capacity, has access to a major commercial corridor in Lexington Avenue and is benefited by existing residential homes within walking distance of the buildings, while being supported by extensive greenspace and Cummings Park. 3. Property Characteristics a. Site Design The School proposes to operate out of the existing buildings and utilize the current parking and access allocated to the Property. As depicted in the images below- the 4295 building benefits from an interior courtyard and architecturally inviting entrance. Exterior courtyard space links the two buildings. The School would benefit from this outdoor space and would like to see it used as an outdoor classroom or lunch area, but proposes to work with the surrounding office May 23, 2024 Pate 4 tenants to ensure that it's use by the School would not unduly impact the 4255 and 4265 buildings. b. Student Enrollment and Student Activities The School desires to initially enroll 400 students. As previously described, the School would serve students PK-12, with a plan to grow to 800 students within the first five years. The School desires to work with staff to develop a phasing plan to ensure a seamless transition for the community including thoughtful consideration of drop-off and pick-up times to limit potential impact on existing traffic patterns. The 4295 building is currently used as a data center and warehouse space and upon initial review is well suited to conversion for athletic facilities. c. Staffing The School's current student -teacher ratio is 13:1. The School employs over 40 faculty, staff members and administrators and looks forward to growing its faculty ranks and bringing continued economic growth to the City. Faculty positions provide opportunities for professional growth in a small school environment, create meaningful impact on student's lives and develop our next generation. After the COVID-19 pandemic, the importance of in -person learning is clear. Recent studies reported in The New York Times, Star Tribune, and The Guardian highlight the detrimental effects of prolonged remote learning on students' mental health and academic progress, further emphasizing the irreplaceable role of in -person instruction in providing a conducive learning environment. Our School is committed to addressing these challenges and providing necessary resources to ensure a safe and supportive environment for students. d. Site Access The Property is currently benefited by two access points off Cummings Park Drive. The School anticipates using the u-shaped drive between the 4255 and 4285 buildings for "walk in" access. Bus traffic would be limited to the western access point for the Center which is like how truck traffic is managed today. Car line traffic would follow the same access path as Bus traffic. The image below depicts a preliminary site access proposal. Yellow solid arrows reflect bus and "car line" traffic, blue arrows show early learning (preschool-k) parent escorted drop off, and then red dashed lines show general pedestrian traffic through the Park. May 23, 2024 Z 4. Zoning Text Amendment School and religious uses are not permitted or conditional in the 1-1. From a market perspective, more schools and religious uses are turning to industrial sites to meet their needs. Examples include the New Century School in Bloomington and Living Word Church in St. Paul and Bloomington where these uses have revitalized aging industrial centers. The City should consider amending its zoning ordinance to accommodate these uses for the following reasons: a. Meet Community Needs: Certain industrial districts of the City may be underutilized - most significantly those office/industrial centers where leasing footprints continue to shrink with more employees working from home. Allowing religious uses and schools in industrial districts encourages mixed -use development and can optimize land use and value. b. Transportation and Accessibility: Industrial districts often have good transportation infrastructure, making them accessible locations for churches and schools while limiting traffic impacts on residential roadways. c. Support of Institutional Uses: Enabling worship centers and schools to establish themselves in industrial districts demonstrates support for these institutions. It recognizes their role as community anchors and acknowledges the value they bring to the social fabric of the city. May 23, 2024 Pate 6 At the same time, the School recognizes the value of light industrial uses within the City and that retaining such uses is essential for continued growth and economic development. To that end, we propose working closely with staff to develop performance standards that ensure that limited industrial properties are protected and that schools and associated uses would only be permitted in the event of strict compliance with the standards. These standards would be incorporated within the Conditional Use Permit (CUP) process. Subject to Council's guidance and direction, additional performance standards might include: 1) proximity or adjacency to residential areas, 2) limited or no truck traffic through shared drive - aisles, 3) traffic management plans for worship services, 4) implementation of sustainability metrics, and 5) development of and access to recreational space within the subject property. 5. Conditional Use Permit Schools and religious uses currently are allowed within the City's residential districts subject to a CUP. While the School's formal application will fully describe and support how the Project will function with limited negative impacts to the surrounding property owners and detail how shared spaces within the MPUD would function with the School in place, a preliminary review of the site conditions reflects that use of the Property for a school and associated religious purpose meets the standards outline in the City Code. a. Traffic Standards: The proposed use is not expected to significantly exacerbate existing traffic congestion or parking shortages in the area. Adequate parking facilities are planned, and traffic flow assessments indicate manageable impacts on the surrounding road network. b. Noise, Glare, Odors, Vibration, Smoke, Dust, Air Pollution, Heat, Liquid or Solid Waste and other Nuisance Characteristics: The School simply will not produce these impacts. Noise and any nuisance conditions relative to the two non -school buildings can be managed prior to formal approvals and in conjunction with public outreach to the existing tenants and building management. c. Drainage: no exterior site changes are proposed by the School. The existing MPUD provides for effective drainage systems on the Property. d. Population Density: approval of the proposed uses will likely result in new families moving into or closer to the City. However, approval of the proposed uses will not lead to a significant increase in population density that would strain existing infrastructure or services. e. Visual and Land Use Compatibility: No exterior changes are proposed by this Project. The constructive reuse of the buildings will retain consistency with the existing uses within the Center and compliment the surrounding residential neighborhoods. f. Adjoining Land Values: the purchase of the building, full tenancy by the School and active use of the Property is anticipated to have a positive effect on adjoining land values. g. Orderly Development and Consistency with the Comprehensive Plan: The proposed uses align with the general purpose and intent of the Comprehensive Plan for the City, contributing to the orderly development of the City. Appropriate performance May 23, 2024 Pate 7 standards associated with the school and religious use can mitigate potential community concerns (if any) and preserve the City's light industrial building footprint, only permitting schools and associated facilities when applicants can demonstrate compliance with these standards. The Project aims to repurpose two nearly vacant industrial buildings into a valuable community asset while being mindful of City policy considerations and existing code requirements. The Property's unique location adjacent to residential neighborhoods and Cumming's Park make it suitable for the proposed use. The School is a reliable and community driven partner- its mission emphasizes faith, development of moral character, leadership and social responsibility. By consolidating its programming into one campus, the School and its students will benefit from a cohesive education experience, significant efficiencies, and valuable logistical advantages for families. We look forward to a robust conversation with staff and the City Council about the Project and the future of our client's community in the City. Please do not hesitate to contact me with any questions, we look forward to continued conversation. SirA.Cerely, 6 Meg � C. Rogers, Larkin Hoffman t4) - for Direct Dial: (952) 896-3395 Direct Fax: (952) 842-1847 Email: mrogers(o)Iarkinhoffman.com 4886-3730-8604, v. 3 spg wl HUI 11 1;- 9, ins lint a HI 01 MH H M H 1H I I P"H 1 1 1H in H. 11 a H M q H; I h! 0 2 1 H Nun M M 'm mn . 2H 11 IN MHJ Ho n, 10 M�g — P-H SH xg M", an NJ IN 1h IHS MR !1 19 1MI 11 in 11 H Rnu HN a, am "M HIP H 01 1HH M Hi H - H -1 H11--swul RM if NMI w un 1H MH H 9 " I H n I H j a map H- w Hh I .. on H I IGH I, En " I M 'HM M2 OR 1H HIO 004 - qh i HH H H N 1R,j !P1 1 . Mw I IN 1; 19 � IMUMH I 0 1H M MH R P in" 1 op H9 On R "N 1MI no H HH 1 1 IN H I S I I I w CV M, a ME al 001 ill '111 'I"HO'Hil 'Hal T j�j I F -H i. c �5 J �ai 1 i jg��,j E 77�-; F , I I, ��� F µ I» 2 1 ASS ul 1 1 E ...... 00 00 �'H og II ----------- Lid ---------- ------------------ A 1whi 1 A MUS HUI !1 €eaOIL wgimulnow inn UH ee "oRm RIF - I Hann ES 110d 6 z zn Inw-1 1H, I I IN maul, M1 in § - n. map o o- E01001HIM Bin ph w lul d HH11A H.� 1 H" R IHMH Wo WIN! -04 fig z WINE Hwml - W9. Roi NO N Im i loge" 11" uh , I HE I n 1M H " Ili sills iI� all 31NIAtl. NOIDNIX3 lEVE —— -- ------ o I Ag I � O I I T ( I o a � E gg a-� 3 " �® •88O0d B MIN I !'10 s III iPii l aLL19 MIN HUI 10 R 1 1 '"HI HN gym: god ! wpm --j§ MR2 a no a h HMO W po �-2 � 1 1-1; Q I'l A R In " In ZO K Igo H 0 MMI M—H IN 11 Mi Ev a 0 H Imu Hn BE W. LLvg q ph H lei M ao gi -, J.H.H.5 0153 lu tau A A. MW 5nl E Hip HIHI 1q, o n a, 1 1; 1 H SUR imu! 'M It M 1MH 5 HN � H� I i 111, Hn 'I go¢ 0 1H UP " 1 He M low 11 1 9 o H, "N PEW o M CEO SK L:1 g loin M 11 M, M, I Ui W H-H 1 9 91 Q91 MINIM I 1 11 HIM 1 HOW i MAN mug, 11 s I HUH HUN, "M 1 1101 ;j OWN gl U-1 O Mal WIM ix A h NIHIMpt -I , " 5 b i _e j1p '4ffl "ludo INS MOWN W1 - H 1 HOME, p MR in < It M Lj wu H "01 in' mil 1 1; IN!, H1 H II 8 w U � anarux[ccaH[ ssg � LEXINGION AVENUE °F aacx°x zz row,nx�vao, �xcEn ____________ I vnxineaE nsvxxr >n�xueu* I o a i 55§g 8 WI -�� IT I 75-777 I A A I �II I I � I sg N I N ° sea __-- •` Q I I I I s� \ I ' I �o' HH : Hn zap° Prig LEXINGTON AVENUE awEcnanx.rownswwnxamx, w,xscxswEs* Szo 3 "�� / a vueaaz mom wac man-or-rr sm•aruc mumMl wpn7 ice\ 3 k Aab fi 55 I In g $II ~ A/ JII'oW �,e� a���� j •� osWq a�� ' I i I n��S �WW$ b6= BYa ® 9 im sAn k I — 77 IF -. - fl-il i I II p ob IF Location Map Attachment B Er. I - _"... Hil I .ai7a } a� f• 5� a.71 Ir .. Inrii:an I �:aP ^- f :fY 1174 f I•. Ir,rhan 1".-ak Trad — IIKJI ?ice :;rtla II Floral F'ark.: �m 6/6/2024, 9:21:31 AM Personal Property Tax Parcels r••—ti •— Cities County Offices r.unrn,,n�s F'ai •, 1. - 4 . I I I I I 1:8,000 0 0.05 0.1 0.2 mi 0 0.1 0.2 0.4 km Ramsey County Ramsey County MN Attachment C MEMORANDUM To: ARDEN HILLS CITY COUNCIL FROM: Amy SCHMIDT, CITY ATTORNEY DATE: JUNE 5, 2024 RE: REGULATING RELIGIOUS LAND USES Introduction 'i • PROFESSIONAL ♦A19 1 SSOCIATION The City has received a Land Use Application for a Concept Plan Review for a proposed school and place of worship use at the property located at 4293 and 4295 Lexington Avenue. Because the property is currently zoned as I-1 Limited Industrial District, where House of Worship and School, General Education are not currently allowed, the Application contemplates a zoning text amendment to allow such uses in this zoning district. Issue Is the City required to allow religious uses in every zoning district throughout the City? Short Answer No, the City is not specifically required to allow religious uses in every zoning district. However, if the City does not have a compelling governmental interest that would be protected by prohibiting religious uses in a given zoning district, there could still be legal risk if the City substantially burdened a religious use in a district in which the religious institution wishes to locate. Discussion A. Substantial Burden on Religious Exercise. The most relevant law to address this question is the Religious Land Use and Institutional Persons Act ("RLUIPA")1. The statute does not explicitly state that a city must allow religious uses in every zoning district. Under RLUIPA, a city is prohibited from imposing land use regulations that substantially burden religious exercise. A city may have such regulations only if the burden imposed furthers a compelling_ governmental interest, and is the least restrictive means to further that compelling_ governmental interest. This standard is a very high bar for a city to reach. RLUIPA defines "religious exercise" as "any exercise of religion, whether or not compelled by, or central to, a system of religious belief."2 Federal Courts have found that this includes not only worship services, but also religious schools and other activities and functions that are part of the mission of the religious entity.' 142 USC § 2000cc. 2 42 U.S.C. § 2000cc-5(7)(A). 3 See, e.g., Westchester Day School v. Village of Mamaroneck, 504 F.3d 338, 352-53 (2d Cir.2007). 231246vl At the same time, even under the challenging "compelling governmental interest" standard, RLUIPA does not leave a city powerless to exercise zoning authority. In fact, as interpreted by Federal Courts, under RLUIPA, a substantial burden is more than "requiring a religious institution to use feasible alternative locations for religious exercise."4 In other words, a city is not automatically required to allow a religious user to locate anywhere the entity chooses, including a location that is more convenient for the religious entity.5 Similar to the use in this Application, in one case, the Federal Sixth Circuit found that a Christian school was not substantially burdened by the denial of a special -use permit to relocate its school to a new, more convenient location because the school could still carry out its religious mission at its current location.6 For a regulation to be a substantial burden, there must be a "close nexus" between the use that is regulated and the religious entity's religious exercise.7 One court offered the example of "a situation where a school could easily rearrange existing classrooms to meet its religious needs in the face of a rejected application to renovate. In such case, the denial would not substantially threaten the institution's religious exercise, and there would be no substantial burden, even though the school was refused the opportunity to expand its facilities."8 It is worth noting that a burden can be "substantial" without being insurmountable.9 If a school "has no ready alternatives, or where the alternatives require substantial `delay, uncertainty, and expense,' a complete denial of the school's application might be indicative of a substantial burden."10 Accordingly, as mentioned above, denying a re -zoning application is not without some potential legal risk. B. Equal Terms. One other noteworthy consideration: a city is not allowed to impose a land use regulation in a manner that treats a religious assembly on less than equal terms with a nonreligious assembly. With this Application, this means that if other types of assemblies are allowed in the I-1 district, then this applicant could pose a legal challenge on this basis. Conclusion Although the City is not specifically required to allow religious uses in every zoning district throughout the City, the requirements of RLUIPA are significant. As this application proceeds through the City's review process, further legal analysis will be required before the City Council makes its final decisions. a Marianist Province of the United States v. City of Kirkwood, 944 F.3d 996, 1001 (8th Cir. 2019). 5 Id. 6 Id., citing, Livingston Christian Sch. v. Genoa Charter Twp., 858 F.3d 996, 1007-09 (6th Cir. 2017). 7 Westchester Day School v. Village of Mamaroneck, 504 F.3d 338, 352-53 (2d Cir.2007). 8 Id. 'Id., citing, Saints Constantine and Helen Greek Orthodox Church, Inc. v. City of New Berlin, 396 F.3d 895, 901 (7th Cir. 2005). io Id., quoting, Saints Constantine and Helen Greek Orthodox Church, Inc. v. City of New Berlin, supra. 2 231246vl AGENDA ITEM - 3B ,-AI�EN HILLS MEMORANDUM DATE: June 10, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Lucas J. Miller Assistant Public Works Director David Swearingen, P.E. Public Works Director / City Engineer SUBJECT: Highway 96/Highway 10 Corridor Landscaping and Irrigation Maintenance Budgeted Amount: Actual Amount: Funding Source: $0 TBD Park Fund; Tree Replacement funds Council Should Consider • Council should consider adding irrigation at the SW quadrant of TH-10 and Hwy-96 throughout the area of existing landscaping and replacing approximately 17 dead shrubs on the top side of the retaining wall along Lakeshore Place. • Council should consider pursuing irrigation along Highway 96 corridor to improve the health and longevity of the trees and landscaping along that corridor. • Council should consider replacement of approximately 30 trees that are in decline along highway 96. Background Lakeshore Place retaining wall landscaping maintenance - Public Works staff has been aware of the viability issues of the landscaping around the Lakeshore Place retaining wall (near the intersection of Highways 96 and 10 southwest quadrant) for the last couple years and adjusted to try to include it as part of our maintenance cycle per the cooperative agreement with Ramsey County approved by City Council on March 10, 2023. This effort of maintenance is solely dependent on daily workload and staff availability. Based on concerns stated by residents in the area, staff is trying to come up with A) a more realistic and consistent maintenance option for the longevity of the plantings and trees in the area and B) direction to replace the shrubs that are in heavy decline in the area. Arden Hills is required to maintain the area per the cooperative agreement with Ramsey County attached (Attachment A). Irrigation to existing trees locations along Highway 96 — Similarly, the Highway 96 corridor landscaping maintenance is the responsibility of Arden Hills. The City has invested nearly Page 1 of 2 $80,000 into tree replacements annually since 2022. In order to ensure the viability and success of the trees, large amounts of watering is required. These trees require Public Works staff to fill watering bags in order for the trees to thrive throughout the spring, summer and fall months in a very tough environment for growth along a highway boulevard. This effort of maintenance is solely dependent on daily workload and staff availability. Safety is also a concern with this effort, as well. The amount of time staff works along live traffic out of their vehicles should be minimized as much as possible along the corridor of Highway 96, one of the busiest roadways in Arden Hills and posted speed limit of 55 mph. This work is often performed by seasonal staff with little field experience. Staff is interested in gauging the Council's interest in permanently installing an irrigation system to limit the amount of exposure staff has along live traffic, as well as consistently helping the longevity and viability of the trees that we have invested in and replaced in the corridor recently and give them the best chance to survive. Replacement of existing trees in decline along Highway 96 - Recently, Public Works staff inspected the existing condition of the remaining trees along TH-96. Approximately 30 more trees are in major decline. A good portion of the trees have been identified with Emerald Ash Borer (EAB) disease and have been treated over the years, but treatment is no longer a viable option and the trees need to be removed and possibly replaced. Staff would propose replacing these trees in the same fashion, consistent with the annual projects since 2022 using the Tree Replacement Fund, which has an approximate balance of $34,000 that could be utilized for this work. Discussion • Council's vision for the overall corridor of Highway 96 and Highway 10 in regard to longevity and success of the newly replaced trees, and additional trees and shrubbery that are in decline. Budget Impact • Irrigation and replacement of —17 shrubs: estimated $25,000 • Irrigation to existing trees locations along 96: estimated $100,000-$200,000 • Replacement of existing —30 trees in decline along 96: estimated $35,000 Attachments Attachment A — Lakeshore Place retaining wall landscaping maintenance agreement Page 2 of 2 REQUEST FOR SIGNATURE FORP Attachment A Request for Signature County Manager 1. Type of document Cooperative Agreement 2. Aspen PO, contract or document number 3. Original contract number PW2023-18M 4. Contractor or grantor name City of Arden Hills 5. Contractor Aspen ID # and CERT SVN and/or DUN # 6. Requesting business unit Additional business unit 7. Authority (required - DO NOT leave blank) Admin Code: Resolution Number: B2023-052 8. Program/project/service/grant name 9. Brief description of goods, services or grant duties (will be used for the County Board monthly contract report) Landscape Maintenance - Highway 96 and Highway 10 Interchange 10. Original contract start date 06/01/23 11. Original contract end date 12/31/43 12. Amendment number and amendment start date 13. Amendment end date 14. Contract type No Cost 15. Original contract amount 16. Previous amendment(s) total 17. Amendment amount 18. New total contract value 19. Funding string Funding source 20. Revenue agreement budgeted amount 21. County contact and phone number John 'Rich" Profaizer 651-266-7117 22. Signatures Department Preparer Tina Westling Date: 05/09/23 Department Director SFiaa E ltaxum aE,,.,, ,,,,b;.. r Date: 05 09 2023 Finance Analyst �GG%K.GC� �GG Date: 7//7zJ Attorne d Date: July 24, 2023 " / = RAMSEY COUNTY PW2023-18M CITY OF ARDEN HILLS COOPERATIVE AGREEMENT WITH RAMSEY COUNTY for Landscape Maintenance at the Interchange of Highway 96 and Highway 10 Attachment: Exhibit A — SP 6205-969 Pg 5 THIS AGREEMENT, by and between the City of Arden Hills, Minnesota, a municipal corporation, hereinafter referred to as the "City," and Ramsey County, a political subdivision of the State of Minnesota, hereinafter referred to as the "County"; WITNESSETH•. WHEREAS, the County and the State of Minnesota, acting through its Commissioner of Transportation ("State"), constructed the "Arden Hills Landscaping Plan" along Trunk Highway No. 10 under State Project No. 6205-969 (T.H. 10=062); and WHEREAS, the County and the State have a cooperative agreement, MnDOT Contract No: 1026558; and WHEREAS, the County and the State's cooperative agreement designates the County to maintain the landscaped areas of the "Arden Hills Landscape Plan"; and WHEREAS, the County and the State's cooperative agreement, under Section 2.2 Right of Way, Easements and Permits, authorizes the County and its suppliers, contractors, or volunteers under the direction of the County to work on and occupy the State's Right -of -Way; and WHEREAS, the landscaped areas of the "Arden Hills Landscape Plan" are located within the City of Arden Hills; and WHEREAS, the County and the City desire to have the care and upkeep of the "Arden Hills Landscape Plan" shown in Exhibit A be provided by the City. NOW, THEREFORE, IT IS HEREBY MUTUALLY AGREED AS FOLLOWS: 1. This agreement is effective June 1, 2023. Agreement terms will remain in effect until such time the landscaped areas shown in Exhibit A are permanently removed and/or declared by the City to no longer exist. PW2023-18M 2. The County will provide, within 120 days following the effective date and at its own cost, a one-time refurbishing of the landscape specific to the treed and mulch bed areas on the front side of the retaining wall separating Lakeshore Place and CSAH 96/Old US 10. Refurbishing shall mean returning the existing landscape to a condition commensurate with that of its original installation and shall include replacing dead or dying trees and converting the mulched planting beds, using seed/sod and up to three (3) additional trees, to match the adjoining treed grass/ turf areas. 3. On and thereafter the effective date, the City will provide, at no cost to the County, all care and upkeep of the landscaped areas shown in Exhibit A. Care and upkeep shall mean to include all labor, material, and equipment to maintain, repair, water, fertilize and perform any future plant replacements. 4. The City shall care for and upkeep the landscaped areas as a volunteer to the County, working under the direction of the County, as provided for in the County's contract agreement with the State. 5. The City shall have discretion over the level of care and upkeep of the landscape areas they provide. 6. The City will adhere to the State's contract agreement requirements with the County relating to the performance of landscape maintenance and/or landscape care and upkeep. 7. The City and County recognize that landscaped areas covered under this agreement are located along State right of way and that the State, at its discretion, may direct the removal of landscaped areas within its right of way. 8. The County agrees to remove, at no cost to the City, the landscaped areas covered under this agreement which the State may order to remove permanently. 9. City and the County agree to indemnify each other and hold each other harmless from any and all claims, causes of action, lawsuits, judgments, charges, demands, costs, and expenses including, but not limited to, interest involved therein and attorneys' fees and costs and expenses connected therewith, arising out of or resulting from the failure of either party to satisfy the provisions of this agreement or for damages caused to third parties as a result of the manner in which the City or the County perform or fail to perform duties imposed on each party by the terms of this agreement. Nothing herein will constitute a waiver of limitations of liability available at Minnesota Statutes Chapter 466 and other applicable laws. THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK PW2023-18M IN WITNESS WHEREOF, the parties have caused this Agreement to be executed. CITY OF ARDEN HILLS wt 51.0114 Rio r Its / --br. -- Uor L-S Date: RAMSEY COUNTY By. I Ryan T. O'Connor Ramsey County Manager Date: 07/26/2023 Recommend For Approval &Ylan U lsaac,ron Brian E Isaacson (May 9, 2023 16:21 CDT) Brian Isaacson Director of Public Works Approved as to Form: a sistant Co y Attorney W N W 0 0 Z Z Lu JLLI S 6. � W IL U h Z o Z J2 o� N N N U O a W Q y <�oamo fad �ooW� cat 2 al a N m N 2 X W Milk Board of Commissioners RAMSEY Resolution COUNTY B2023-052 Sponsor: Public Works Title: 2023 - 2027 Transportation Improvement Program Background and Rationale: 15 West Kellogg Blvd. Saint Paul, MN 55102 651-266-9200 Meeting Date: 4/4/2023 File Number: 2023-120 To qualify for state and federal funding and to proceed with construction projects, the Ramsey County Board of Commissioners must approve the Public Works 5-year Transportation Improvement Program (TIP). The TIP is a planning document and funding estimates identified in the TIP are reflected in the county's Capital Improvements Program Budget. Similar programs have been developed each year since 1988. The Public Works department, annually, prepares the TIP using a collaborative process whereby the county solicits projects and input from area municipalities. Project inclusion in the TIP is based on a cooperative dialogue with municipal and state partners, along with technical analysis and consideration of funding opportunities. While funding limits will continue to challenge program delivery, communication and engagement with municipal partners ensures local needs and priorities are examined and addressed to the extent possible. Projects included in the TIP are also looked at through the lens of the Ramsey County All Abilities Transportation Network policy, which prioritizes the most vulnerable users (i.e. pedestrians, bicyclists, people with disabilities, etc.) first. The design, construction, and right-of-way costs identified in the TIP are estimates based on best practices in the industry. The funding landscape for transportation projects can be volatile and the ultimate delivery of the TIP is dependent on future funding levels. Partnering on projects with area communities, bordering counties, the Minnesota Department of Transportation, and other state agencies will continue to be a critical way for Ramsey County to get the most from available funds. Recommendation: The Ramsey County Board of Commissioners resolved to: Page 1 of 3 File Number: 2023-120 Resolution Number: B2023-052 1. Adopt the 2023 - 2027 Public Works Transportation Improvement Program. 2. Authorize the County Engineer to prepare plans and agreements for all projects identified in the Transportation Improvement Program, and to issue solicitations in accordance with County policies and procedures and the Minnesota Department of Transportation's list of "Pre -Qualified Vendors by Work Type". 3. Authorize the County Surveyor to execute Right of Way Plats and Certificate of Surveys for Highway projects that require the determination of existing right of way for the delineation and /or acquisition of property, for planning studies or disposition of excess county property. 4. Authorize the County Manager to enter into contracts and agreements, and execute change orders and amendments to contracts, supplemental agreements, and agreements related to the expenditure of Transportation Improvement Program Project Funds utilizing County State Aid, Federal, State, and participating funding associated with the construction of the approved projects in the 2023 - 2027 Transportation Improvement Program or a previously approved Transportation Improvement Program in accordance with the county's procurement policies and procedures. 5. Authorize the County Engineer and County Attorney to acquire temporary easements, permanent easements, fee title, and enter into Limited Use Permits with the State of Minnesota for projects in the 2023 - 2027 Transportation Improvement Program, or previously approved Transportation Improvement Program, by negotiation or condemnation. 6. Authorize the Public Works Director to approve negotiated settlements for up to $100,000 over the county's appraised value per parcel for temporary and permanent easements and fee title. 7. Authorize the County Manager to approve and execute purchase agreements, settlements, closing documents, Limited Use Permits, and other related real estate documentation associated with County Board approved acquisitions of real property. 8. Authorize the County Manager to approve and execute cooperative agreements and maintenance agreements with cities, counties, the state, and other governmental agencies for their participation in projects listed in the 2023 - 2027 Public Works Transportation Improvement Program or previously approved Transportation Improvement Program. 9. Authorize temporary cash loans from the County General Fund to the Road and Bridge Capital Improvement Program fund and the Wheelage Tax fund for costs of projects listed in the 2023 -2027 Public Works Transportation Improvement Program, or previously approved Transportation Improvement Program, and for maintenance project expenditures occurring before bond or wheelage tax proceeds are received pending receipt of Federal, County State Aid Highway, state and participating funds. 10. Authorize the Public Works Director to submit grant applications for state and federal funding for projects listed in the 2023 - 2027 Public Works Transportation Improvement Program. 11. Authorize the County Manager to accept grants and execute grant agreements agreeing to the grant terms and conditions for the grant award. For grants that so require, the county agrees to be responsible for any additional amount by which the cost exceeds the county's construction cost estimate and will return to the grantor any grant amount appropriated for the project but not utilized for the project under the terms of the grant agreement. 12. Authorize the County Manager to issue letters of support in place of an official Ramsey County Board Resolution for constituent cities' grant applications. A motion to approve was made by Commissioner McGuire, seconded by Commissioner Reinhardt. Motion passed. Aye: - 7: Frethem, MatasCastillo, McGuire, Moran, Ortega, Reinhardt, and Xiong Page 2 of 3 File Number: 2023-120 Resolution Number: B2023-052 By: Mee Cheng, Chief Clerk - County Board Page 3 of 3 AGENDA ITEM - 3C ,-ARZEN HILLS MEMORANDUM DATE: June 10, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Lucas J. Miller, Assistant Public Works Director SUBJECT: 2025 Park Improvements Project - Arden Oaks Park & Freeway Park Scopes Budgeted Amount: Actual Amount: Funding Source: $230,000 — Arden Oaks Park $TBD PIR — Parks $230,000 — Freeway Park Council Should Consider • Narrowing down the project scope and related budget for the proposed 2025 Park Improvement Project at Arden Oaks Park and Freeway Park. Background At the March 11, 2024 Work Session, Staff presented to City Council an introduction to the Arden Oaks Park & Freeway Park Improvement Project. Arden Oaks Park and Freeway Park play structures and swings were built in 1999 and 1998, respectively. Through the City's Park Maintenance Management Plan, park equipment is to be considered for replacement on a 20-year cycle. Within the 2024-2028 CIP, Arden Oaks Park and Freeway Park are programmed for improvements in 2025. According to the City's Park Maintenance Management Plan, hardcourts are to be considered for resurfacing every 5-8 years, with a life expectancy of 25-35 years depending on conditions. Arden Oaks Park and Freeway Park are scheduled for resurfacing in 2025. By visual inspection, the surface is showing signs for replacement, but the underlying soils do not appear to have an issue with significant heaving. The 2025 Park Improvement Project, as programmed in the 2024-2028 CIP, is only budgeted for the replacement of the play structures, rehabilitation of the hardcourts and some miscellaneous items that relate to the play structure or hardcourts or items that have been consistent in recent past Park Improvement Projects. Public Works Staff and PTRC have each performed site visits and listed feedback for potential park improvements, in addition to the play structures and hardcourts, which is over and above what had been budgeted for in the CIP. This feedback was presented to Council at the March 11 Pagel of 3 Work Session. Council was interested in considering all of these items presented at that Work Session and requested staff to go through the process of receiving feedback from Public outreach and providing preliminary planning level cost estimates of these items prior to determining the final scope of the project. Considering Council's desire to be flexible at the early stages of the project with the design and the current broad scope of the project, Staff requested that Bolton and Menk, Inc. (BMI) provide a Professional Services Agreement (PSA) that only included the following: complete online survey development, public involvement, survey analysis, planning level cost estimates based on feedback and a Public meeting presentation to Council. This PSA with BMI was approved by Council at the April 8, 2024 Council Meeting. Council was able to see the presentation from BMI and the packet information they put together, breaking down in detail the survey results at the Work Session on May 28, 2024. For the Work Session today on June 10, 2024, Council will need to define more, the scope of the project, which will lead the project into the design phase. A PSA amendment will be requested from Bolton & Menk related to that project scope for the Arden Oaks Park & Freeway Park Improvement Project. Anticipated project schedule: • April 2024: Project Kickoff and Online Survey Development (Completed) • April/May 2024: Perform and Complete Public Involvement Process (Completed) • May 2024: Finalize Online Survey Report (Completed) • May 28, 2024: Present Final Report findings at Work Session to Council • June 2024: Take selected Scope of Work and Amend PSA for Design and Construction • July/August 2024: Concept design with updated cost estimates, host Open -House event • August/September 2024: PTRC and City Council involvement and final cost estimates • Fall 2024: Lock in purchase of play equipment • February/March 2025: Bid • April 2025: Award construction contract • Summer/Fall 2025: Construction As mentioned by Bolton and Menk at the last Work Session, there could be a grant opportunity, however, the timeline for the project would definitely need to adjust and would likely push the project back a year due to the timing of the grant application. If Council did desire to go this route, Staff would do more research as to the requirements of the grant and adjust the timeline accordingly, then return back to Council with the attained information at a later Work Session. Discussion Council should review the survey results from both parks and provide direction for the project scope desired for amenities/improvements and related budget. Once the project scope is determined, at a future meeting, BMI will propose an amendment to their existing contract, which will include tasks from design to project closeout. Page 2 of 3 Budget Impact Within the proposed 2024-2028 CIP Budget, the Arden Oaks Park & Freeway Park Improvement Project has $460,000 total budgeted, as seen in the table below: Arden Oaks Park budget. Freeway Park budget: Hardcourt rehab $ 80,000 Hardcourt rehab Play structure replacement $ 150,000 Play structure replacement Total Budget $ 230,000 Total budget Funding source: Arden Oaks Park $ 230,000.00 PIR -Parks Freeway Park $ 230,000.00 PIR -Parks Total funding $ 460,000.00 PIR - Parks Estimated Costs: PSA - Public Engagement and Project Scope $ 12,419 PSA - Design & Construction Admin TBD Arden Oaks Park Construction TBD Arden Oaks Park Structures and Amenities TBD Freeway Park Construction TBD Freeway Park Structures and Amenities TBD Materials Testing TBD Total Project Cost TBD $ 80,000 $ 150,000 $ 230,000 Additional budget scenarios were included within Attachment F for consideration, if Council desires to increase budget to the park projects going forward within the CIP. Staff made the assumption if an increase to the 2025 Park Improvement Project was desired, then future Park Improvement Projects programmed within the CIP should also increase at the same increment. This is reflected in Attachment F. Attachments Attachment A — Survey Summary Attachment B — Arden Oaks Park Cost Estimate Summary Attachment C — Arden Oaks Park Cost Estimate Detail Attachment D — Freeway Park Cost Estimate Summary Attachment E — Freeway Park Cost Estimate Detail Attachment F - CIP - Park Improvement Scenarios Page 3 of 3 he d N Q O a Y Q O LU a W J a O LU LU LL O O (n O E Q 7 A� O O O a N a) Qm O , LLaai �0 c O t!) no E O p Y o O Q co Z;Z J Q o -0 M M 0 a W a z LL W W N O = p OR w a =:a O LU (3) O Re (1) V 0 (1) r_ O L N V 00 3-0 to a� a� _0 M Q� O ORz M 4) O 3 w Y Z a N OO H w H p z� a �a Cd w G H a _LL Y Ix a LU w H LL LuO z �0 w }O Z H j U U a J LL U � N - O 2 z 2 a Q E 90 OR E W � NX w O u �x LU 00 0 M(9 O o r 0 Na c 0 0 Q N> E O CU C N E 0- E V M .L TOP 5 PLAYGROUND AMENITIES FOR THE CITY TO FOCUS ON ADDING Ropes/Climbing Systems Swings Tower playground structures Challenge/Ninja course Free-standing balance beams Other popular playground amenities include early childhood equipment, ADA-accessible play features, merry- go-round/spinners and nature playgrounds. Of respondents would like to have more playground features at Arden Oaks Park Of respondents would support additional funds going toward the enhancement of amenities at Arden Oaks Park Of respondents feel safe and welcome at Arden Oaks Park • Proximity to home/ neighborhood • Open space/green space • Basketball courts • Poor condition of basketball/pickleball courts • Lack of shaded areas • Playground equipment • Quiet/Peaceful environment • Limited seating & picnic facilities • Lack of maintenance (landscaping & mowing) Of respondents would like to Of respondents would like O Of respondents would see pickleball striping added tosee the city host family- 52 /O like to see a picnic shelter 68% 46% to the basketball court. friendly events at the park. added to the park. FREEWAY PARK HOW OFTEN PEOPLE VISIT FREEWAY PARK Every day or almost every day 18% 26% About once a week HOW WOULD YOU RATE THE PHYSICAL CONDITION OF THE PARK AND ITS FACILITIES? 34% Poor 31p/ About once p a month 15p About once /O a year 9% Never 45% Fair HOW OFTEN DO YOU USE THE PLAYGROUNDS AT FREEWAY PARK? 13% — Every day/Almost every day 26% — About once a week 27% — About once a month 16% — About once a year _ 18% — Never HOW IMPORTANT IS IT TO ADD NEW FEATURES AT FREEWAY PARK? 14% Not so' Important 34% Somewhat Important 11% Not at all Important 15% Extremely Important 25% Very Important TOTAL SURVEY CD ENTRIES FOR FREEWAY PARK TOP 5 PLAYGROUND AMENITIES FOR THE CITY TO FOCUS ON ADDING Ropes/Climbing Systems Swings Tower playground structures Nature playground Free-standing balance beams Other popular playground amenities include ADA-accessible play features, early childhood playground equipment, merry-go-round/spinners and free-standing crawl tunnels. What do you like MOST about Freeway Park? 47% _ Of respondents would like to have more playground features =_ Proximity to home Basketball and pickleball or additional playground space at Freeway Park Ice skating and winter courts activities Community and social • Playground equipment gathering place Of respondents would support additional funds going toward Whatdo you LEAST about the enhancement of amenities at Freeway Park -_ • Outdated and poor Safety concerns • _ condition of equipment Limited amenities • Lack of maintenance and Inadequate parking and upkeep access Of respondents feel safe and welcome at Freeway Park = OOf respondents support Of respondents would like O Of respondents would support continuing to flood a to see the city host family-85 /Oadding a concrete surface under the 92 /o ? 54% recreational and hockey rinks. friendly events at the park. rink to utilize year—round Arden Oaks Park I Arden Hills, MN Attachment B Cost Estimate Summary Identified Improvements Estimated Cost Playground replacement - existing perimeter $171,080.00 Playground replacement - upgraded concrete perimeter $191,100.00 Playground replacement (combine into one container & Upgraded Amenities) $315,490.00 Picnic Shelter $82,600.00 Shade Structure $12,600.00 Basketball Court Resurfacing $11 760.00 Basketball Hoops $15,400.00 Bicycle Parking $1,304.80 Restroom $3,091.20 Benches $10,640.00 Picnic Table $7,000.00 Trash receptacles $2 772.00 Dog Waste Stations $700.00 Park Entrance Sign $7,000.00 GaGa Ball Pit $2,450.00 Accessible Trail Construction $21,420.00 Accessible route to picnic shelter $2,380.00 Wayfinding/Interpretive Signage $1,750.00 Page 1 of 1 Attachment C Arden Oaks Park I Arden Hills, MN Preliminary Cost Estimate Identified Improvements Unit Qty I Unit Cost I Estimated Cost Playground replacement - existing containers $171,080.00 Remove existing playground Lump Sum 1 $3,000.00 $3,000.00 Playground equipment Lump Sum 1 $80,000.00 $80,000.00 Playground installation Lump Sum 1 $32,000.00 $32,000.00 Plastic play area perimeter - plastic Lin Ft 320 $10.00 $3,200.00 Playground surfacing - wood fiber cubic yards 80 $50.00 $4,000.00 Alternate Surfacing: Poured In Place Rubber Sq Ft 2100 $25.00 $52,500.00 Design/Engineering/Consulting 20% $24,440.00 Construction Contingency 20% $24,440.00 Playground replacement - upgraded concrete containers $193,340.00 Remove existing playground Lump Sum 1 $3,000.00 $3,000.00 Playground equipment Lump Sum 1 $80,000.00 $80,000.00 Playground installation Lump Sum 1 $32,000.00 $32,000.00 Concrete play area perimeter (8" wide curb) Lin Ft 320 $40.00 $12,800.00 Site Grading Sq Ft 2100 $3.00 $6,300.00 Playground surfacing - wood fiber cubic yards 80 $50.00 $4,000.00 Alternate Surfacing: Poured In Place Rubber Sq Ft 2100 $25.00 $52,500.00 Design/Engineering/Consulting 20% $27,620.00 Construction Contingency 20% $27,620.00 Playground replacement (combine into one container & upgraded amenities) $315,490.00 Remove existing playground Lump Sum 1 $3,000.00 $3,000.00 Playground equipment Lump Sum 1 $130,000.00 $130,000.00 Playground installation Lump Sum 1 $52,000.00 $52,000.00 Concrete play area perimeter Lin Ft 250 $35.00 $8,750.00 Site grading Sq Ft 4000 $3.00 $12,000.00 Playground surfacing - wood fiber cubic yards 152 $50.00 $7,600.00 Drain Tile (Includes Cleanouts + Rock) Lin Ft 400 $30.00 $12,000.00 Alternate Surfacing: Poured In Place Rubber Sq Ft 4000 $25.00 $100,000.00 Design/Engineering/Consulting 20% $45,070.00 Construction Contingency 20% $45,070.00 Picnic Shelter $82,600.00 Picnic shelter (16'x16') Metal Construction Each 1 $50,000.00 $50,000.00 Concrete pad (4" Concrete) Sq Ft 600 $12.00 $7,200.00 Site Grading/Prep Sq Ft 600 $3.00 $1,800.00 Design/Engineering 20% $11,800.00 Construction Contingency 20% $11,800.00 Shade Structure $12,600.00 Shade sail over picnic table Each 1 $4,500.00 $4,500.00 Installation Each 1 $4,500.00 $4,500.00 Design/Engineering 20% $1,800.00 Construction Contingency 20% $1,800.00 Basketball Court Resurfacing $11,760.00 Mill + Overlay of basketball court Sq. Yd. 140 $32.00 $4,480.00 Acyrlic Painting Sq. Yd. 140 $28.00 $3,920.00 Design/Engineering 20% $1,680.00 Construction Contingency 20% $1,680.00 Page 1 of 3 Arden Oaks Park I Arden Hills, MN Preliminary Cost Estimate Basketball Hoops $15,400.00 Basketball Hoops Each 2 $5,000.00 $10,000.00 Installation Each 2 $500.00 $1,000.00 Design/Engineering 20% $2,200.00 Construction Contingency 20% $2,200.00 Bicycle Parking $1,304.80 Bicycle Parking Each 1 $500.00 $500.00 Concrete Pad (4" Thick) Scl Ft 36 $12.00 $432.00 Design/Engineering 20% $186.40 Construction Contingency 20% $186.40 Restroom $3,091.20 Concrete pad Scl Ft 64 $12.00 $768.00 Screen Fence - wood/metal Lin Ft 24 $60.00 $1,440.00 Design/Engineering/Consulting 20% $441.60 Construction Contingency 20% $441.60 Benches $10,640.00 Bench Each 4 $1,500.00 $6,000.00 Concrete pad (^32 SF) Each 4 $400.00 $1,600.00 Design/Engineering/Consulting 20% $1,520.00 Construction Contingency 20% $1,520.00 Picnic Table $7,000.00 Picnic Table Each 2 $1,600.00 $3,200.00 Concrete pad (-84 SF) Each 2 $900.00 $1,800.00 Design/Engineering/Consulting 20% $1,000.00 Construction Contingency 20% $1,000.00 Trash receptacles $2,772.00 Trash receptacles Each 2 $800.00 $1,600.00 Concrete pad (-16 SF) Each 2 $190.00 $380.00 Design/Engineering/Consulting 20% $396.00 Construction Contingency 20% $396.00 Dog Waste Stations $700.00 Dog waste stations Each 1 $500.00 $500.00 Design/Engineering 20% $100.00 Construction Contingency 20% $100.00 Park Entrance Sign $7,000.00 Entrance signs Each 1 $5,000.00 $5,000.00 Design/Engineering 20% $1,000.00 Construction Contingency 20% $1,000.00 GaGa Ball Pit $2,450.00 Materials Each 1 $1,750.00 $1,750.00 Design/Engineering 20% $350.00 Construction Contingency 20% $350.00 Accessible Trail Construction $21,420.00 Trail construction to playground and bathroom (8' Wide) Lin Ft 150 $34.00 $5,100.00 Establish trail connection at Arden Oaks Ct. Lin Ft 300 $34.00 $10,200.00 Design/Engineering/Consulting 20% $3,060.00 Construction Contingency 20% $3,060.00 Accessible route to picnic shelter $2,380.00 Trail construction - 8' Wide Bituminous Lin Ft 50 $34.00 $1,700.00 Page 2 of 3 Arden Oaks Park I Arden Hills, MN Preliminary Cost Estimate Design/Engineering/Consulting 20% $340.00 Construction Contingency 20% $340.00 Page 3 of 3 Freeway Park I Arden Hills, MN Attachment D Cost Estimate Summary Identified Improvements Estimated Cost Accesible Trail Construction $40,796.00 Parking Lot $67,900.00 Tree Removals $21,000.00 Tree Trimming $6,300.00 Playground Replacement $181,300.00 Playground Replacement - Upgraded concrete perimeter $205,660.00 Playground Replacement - Upgraded Amenities $314,060.00 Rink - Wood Dasher Boards $157,808.00 Rink - Aluminum Dasher Boards $174,608.00 Rink - Fiberglass Dasher Boards $223,608.00 Concrete Hockey Rink Slab $300,580.00 Basketball Hoop $7,700.00 Basketball Court Resurfacing $17808.00 LED Rink Lighting $105,000.00 Building Replacement $250,000-$1,000,000 Building Repairs $70,000.00 Bicycle Parking $4,648.00 Portable Toilet $3,091.20 Benches $10,640.00 Picnic Tables $5,880.00 Trash Receptacles $3 628.80 Dog Waste Stations $1,400.00 Park Entrance Sign $7,000.00 GaGa Ball Pit 1 $2,450.00 Wayfinding/Interpretive Signage 1 $1,750.00 Page 1 of 1 Freeway Park I Arden Hills, MN Attachment E Preliminary Cost Estimate Identified Improvements Unit Qty Unit Cost Estimated Cost Accesible Trail Construction $40,796.00 Trail Construction - Bituminous (8' Wide) (connect upper and lower section of park) Lin Ft 460 $34.00 $15,640.00 Grading Lump Sum 1 $5,000.00 $5,000.00 Clearing + Grubbing Trees Each 5 $1,500.00 $7,500.00 Electric Utility Power Pole Relocation Lump Sum 1 $1,000.00 $1,000.00 Design/Engineering 20% $5,828.00 Construction Contingency 20% $5,828.00 Parking Lot $67,900.00 Pave Gravel Parking Lot (+/-) 6 Stalls (Bituminous + Aggregate Base) Scl Ft 1900 $25.00 $47,500.00 Parking Lot Striping (Including ADA Stall + Access Aisle) Lin Ft 200 $5.00 $1,000.00 Design/Engineering/Consulting 20% $9,700.00 Construction Contingency 20% $9,700.00 Tree Removals $21,000.00 Tree Removals Day 2 $5,000.00 $10,000.00 Stump Removals Day 1 $5,000.00 $5,000.00 Design/Engineering/Consulting 20% $3,000.00 Construction Contingency 20% $3,000.00 Tree Trimming $6,300.00 Tree Trimming - 1 day Each 1 $4,500.00 $4,500.00 Design/Engineering/Consulting 20% $900.00 Construction Contingency 20% $900.00 Playground Replacement $181,300.00 Remove Existing Playground Lump Sum 1 $3,000.00 $3,000.00 Playground Equipment Lump Sum 1 $85,000.00 $85,000.00 Playground Installation Lump Sum 1 $34,000.00 $34,000.00 Concrete Play Area Perimeter - Plastic Lin Ft 250 $10.00 $2,500.00 Playground Surfacing - Wood Fiber cubic yds 100 $50.00 $5,000.00 Alternate Surfacing: Poured -In -Place Rubber Scl Ft 3300 $25.00 $82,500.00 Design/Engineering 20% $25,900.00 Construction Contingency 20% $25,900.00 Playground Replacement - Upgraded concrete perimeter $205,660.00 Remove Existing Playground Lump Sum 1 $3,000.00 $3,000.00 Playground Equipment Lump Sum 1 $85,000.00 $85,000.00 Playground Installation Lump Sum 1 $34,000.00 $34,000.00 Concrete Play Area Perimeter Curb (8" Wide) Lin Ft 250 $40.00 $10,000.00 Site Grading Scl Ft 3300 $3.00 $9,900.00 Playground Surfacing - Wood Fiber cubic yds 100 $50.00 $5,000.00 Alternate Surfacing: Poured -In -Place Rubber Scl Ft 3300 $25.00 $82,500.00 Design/Engineering 20% $29,380.00 Construction Contingency 20% $29,380.00 Playground Replacement - Upgraded Amenities $314,060.00 Remove Existing Playground Lump Sum 1 $3,000.00 $3,000.00 Playground equipment Lump Sum 1 $125,000.00 $125,000.00 Playground Installation Lump Sum 1 $50,000.00 $50,000.00 Concrete Play Area Perimeter Curb (8" Wide) Lin Ft 250 $40.00 $10,000.00 Site Grading Scl Ft 3300 $3.00 $9,900.00 Playground Surfacing - Wood Fiber cubic yds 100 $50.00 $5,000.00 Alternate Surfacing: Poured -In -Place Rubber Sq Ft 3300 $25.00 $82,500.00 Design/Engineering 20% $57,080.00 Page 1 of 3 Freeway Park I Arden Hills, MN Preliminary Cost Estimate Construction Contingency 20% $57,080.00 Rink - Wood Dasher Boards $157,808.00 Removal of Existing Boards Lump Sum 1 $1,000.00 $1,000.00 Rink Boards (150'x75') & Installation Lump Sum 1 $93,000.00 $93,000.00 Concrete Dasher Board Strip (15" Wide x 6" Depth) Lin Ft 416 $45.00 $18,720.00 Design/Engineering/Consulting 20% $22,544.00 Construction Contingency 20% $22,544.00 Rink - Aluminum Dasher Boards $174,608.00 Removal of Existing Boards Lump Sum 1 $1,000.00 $1,000.00 Rink Boards (150'x75') & Installation Lump Sum 1 $105,000.00 $105,000.00 Concrete Dasher Board Strip (15" Wide x 6" Depth) Lin Ft 416 $45.00 $18,720.00 Design/Engineering/Consulting 20% $24,944.00 Construction Contingency 20% $24,944.00 Rink - Fiberglass Dasher Boards $223,608.00 Removal of Existing Boards Lump Sum 1 $1,000.00 $1,000.00 Rink Boards (150'x75') & Installation Lump Sum 1 $140,000.00 $140,000.00 Concrete Dasher Board Strip (15" Wide x 6" Depth) Lin Ft 416 $45.00 $18,720.00 Design/Engineering/Consulting 20% $31,944.00 Construction Contingency 20% $31,944.00 Concrete Hockey Rink Slab $300,580.00 6" Reinforced Concrete Slab w/ Thickened Edge for Dasher Board Mounting Lump Sum 1 $200,000.00 $200,000.00 Draintile Lin Ft 420 $35.00 $14,700.00 Design/Engineering/Consulting 20% $42,940.00 Construction Contingency 20% $42,940.00 Basketball Hoops $7,700.00 Basketball Hoops Each 1 $5,000.00 $5,000.00 Installation Each 1 $500.00 $500.00 Design/Engineering/Consulting 20% $1,100.00 Construction Contingency 20% $1,100.00 Basketball Court Resurfacing $17,808.00 Mill + Overlay of basketball court Sq. Yd. 212 $32.00 $6,784.00 Acyrlic Painting Sq. Yd. 212 $28.00 $5,936.00 Design/Engineering 20% $2,544.00 Construction Contingency 20% $2,544.00 LED Rink Lighting $105,000.00 New LED Lighting (lights, poles, new electrical, app controlled) Each 4 $18,750.00 $75,000.00 Design/Engineering/Consulting 20% $15,000.00 Construction Contingency 20% $15,000.00 Building Replacement $250,000-$1,000,000 Building Replacement Lump Sum 1 $250,000-$1,000,000 $250,000-$1,000,000 Design/Engineering 20% Construction Contingency 20% Building Repairs $70,000.00 Building Repairs Lump Sum 1 $50,000.00 $50,000.00 Design/Engineering 20% $10,000.00 Construction Contingency 20% $10,000.00 Bicycle Parking $4,648.00 Bicycle Parking Each 4 $500.00 $2,000.00 Concrete Pad (4" Thick) Sq Ft 110 $12.00 $1,320.00 Design/Engineering 20% $664.00 Construction Contingency 20% $664.00 Portable Toilet $3,091.20 Page 2 of 3 Freeway Park I Arden Hills, MN Preliminary Cost Estimate Concrete Pad Scl Ft 64 $12.00 $768.00 Screen Fence - Wood/Metal Lin Ft 24 $60.00 $1,440.00 Design/Engineering 20% $441.60 Construction Contingency 20% $441.60 Benches $10,640.00 Bench Each 4 $1,500.00 $6,000.00 Concrete Pad (-32 SF) Each 4 $400.00 $1,600.00 Design/Engineering 20% $1,520.00 Construction Contingency 20% $1,520.00 Picnic Tables $5,880.00 Picnic Table Each 2 $1,200.00 $2,400.00 Concrete Pad (-84 SF) Each 2 $900.00 $1,800.00 Design/Engineering 20% $840.00 Construction Contingency 20% $840.00 Trash Receptacles $3,628.80 Trash Receptacles Each 3 $800.00 $2,400.00 Concrete Pad (4" Thick) Scl Ft 16 $12.00 $192.00 Design/Engineering 20% $518.40 Construction Contingency 20% $518.40 Dog Waste Stations $1,400.00 Dog Waste Stations Each 2 $500.00 $1,000.00 Design/Engineering 20% $200.00 Construction Contingency 20% $200.00 Park Entrance Sign $7 000.00 Entrance Sign (City Standard Design) Each 1 $5,000.00 $5,000.00 Design/Engineering 20% $1,000.00 Construction Contingency 20% $1,000.00 GaGa Ball Pit $2,450.00 Materials Each 1 $1,750.00 $1,750.00 Design/Engineering 20% $350.00 Construction Contingency 20% $350.00 Page 3 of 3 Attachment F CIP - Park Improvement Scenarios Excludes Old Hwy 10 & Lake Johanna Trails 2024-2028 CIP Capital Improvement Funds (PIR) Scenario 1: Arden Oaks & Freeway Park Improvements - $460,000 in 2025 $3.0 $2.0 : _. 5 $1.86 $1.72 $1.5 $1.33 $1.0 $0.58 $0.fi4 $0.60 $0.0 • • ■ 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Scenario 2: Additional $100,000 in 2027, 2029, 2033 $3.D $2.5 52.52 52.37 $2.0 51.43 $1.48 $1.5 51.03 $l.o �5 $0,38 . 1 $0.0 2024 2025 2026 2027 2028 2029 Scenario 3: Additional $200,000 in 2027, 2029, 2033 $3.D 52.52 $2.5 52.27 $2.0 $1.5 51.33 $1.28 $1.0 $0.73 $0.5 $0.18 . $0.0 2024 2025 2026 2027 2028 2029 Scenario 4: Additional $300,000 in 2027, 2029, 2033 $3.0 $2.5z 2 $2.5 $2.0 51.5 $1.23 $1.56 $1.32 $0.34 $0.30 2030 2031 2032 2033 $126 $0.92 $0�04 $0.00 2030 2031 2032 2033 $0.5 $.5 $1.08 $0.96 $0.43 , $0.52 ■ $0.0 $Q-az -50.5 -$0.26 -$0.30 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 CIP - Park Improvements Page 1 AGENDA ITEM - 3D ,-ARZEN HILLS MEMORANDUM DATE: June 10, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: David Swearingen, P.E. Public Works Director / City Engineer SUBJECT: Spring Lake Park Lions Club Donation Discussion Budgeted Amount: Actual Amount: Funding Source: N/A $15,000.00 Spring Lake Park Lions Club For Council Consideration Council should discuss how they would like to use the funds donated by the Spring Lake Park Lions Club. Background The Spring Lake Park Lions Club contacted City Staff about donating funds with the intent of it to be used towards Park improvements. On May 13, 2024, through Resolution 2024-027, the City Council accepted the donation in the amount of $15,000. Since 1986, the SLP Lions Club has been one of Minnesota's Largest Charitable Gambling Organizations, and they run a pull -tab booth in the City. The SLP Lions Club aims to help those in need within the community through various fundraising activities. They are active in the Arden Hills' community and wanted to see these funds used towards Park improvements. Budget Impact N/A Attachment N/A Page 1 of 1 AGENDA ITEM - 3E ,-ADEN HILLS MEMORANDUM DATE: June 10, 2024 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: City Council Code of Conduct Budgeted Amount: Actual Amount: N/A Council Should Consider N/A Funding Source: N/A The City Council should consider giving direction on the draft Council Code of Conduct. Background Staff is suggesting Council discuss this item, Council approved the topic on the previous agenda setting discussion. Council discussed norms of behavior in January as part of the conversation with LMCIT. Prior to that, Council discussed norms of behavior in 2016 as part of their Council retreat, see attached for what was discussed in 2016 (Attachment A). This discussion is intended to generate an agreed upon policy for what is acceptable for interactions between the City Council and Staff both at official meetings and throughout the normal course of City business. As part of the research for this item, Staff noted many other cities also address interactions between Councilmembers, as did the 2016 document, Staff did include similar items for Council's consideration. Staff drafted a possible document for Council consideration, Council may choose to move forward with this document or edit as it sees fit, see Attachment B. Budget Impact N/A Attachment Attachment A: 2016 City Council Norms of Behavior Attachment B: Draft City Council Code of Conduct Page 1 of 1 Attachment A 'It EN HILLS CITY COUNCIL NORMS OF BEHAVIOR The City Council - led by Mayor Grant, discussed how norms of behaviors would help improve the Council's operations and better define roles and expectations working with the City Staff. These will be adopted by the City Council at a council meeting. Arden Hills: Proposed City Council Norms of Behavior (2016) 1. Speak only for yourself, not for other Councilmembers - unless specifically tasked by your colleagues to speak for the group. 2. Don't question motives. Assume others have positive intentions, even when you disagree. 3. Be respectful of one another, and the public process, at all times. Do not criticize Staff or others in public. 4. Aim for consensus, but accept decisions of the majority once made. 5. Stay focused on the elected official role -- policy, prioritization and citizen representation. 6. Work primarily through the City Administrator or a Department Head, and through line staff with prior arrangement. May work with the writer of a memo in a packet to request information for clarification. Refrain from attending staff meetings, trainings, "rides- along" or group staff functions unless specifically invited or cleared by the City Administrator. 7. Respect Staff and the fact that they work for the Council as a whole. Don't expect or ask them to engage in the fray (secrets, gossip, triangulation), make your individual case (to take sides), or to be your "insider" (informant). Arden Hills Council/Staff Retreat 2016 Prepared by Barbara K, Strandell Attachment B .ARZEN HILLS CITY OF ARDEN HILLS City Council Code of Conduct The City Council, led by the Mayor, has agreed to following code of conduct regarding the conduct of Councilmembers in and out of official City Council meetings. 1. Be respectful of one another, and the public process, at all times. Do not criticize other Councilmembers or Staff in public. 2. Stay focused on the elected official role — policy creation, statutory duties and citizen representation. 3. Aim for a consensus and have a respectful debate when appropriate, but accept decisions of the majority once made. 4. Limit contact to specific Staff. Questions of Staff and/or requests for additional background information should be directed to the City Administrator or responsible Department Head. The City Administrator should be copied on or informed of any request. 5. Council shall not complain about or disparage Staff members or City Councilmembers to other Staff members or Councilmembers. 6. Respect Staff and the fact that they work for the Council as a whole. Do not expect or ask them to engage in the fray (secrets, gossip, triangulation), make your individual case (take sides), or to be your "insider" (informant). 7. Council direction to Staff should only be given at Council meetings, Council should strive to be clear when it gives direction ensuring at least a majority of Council is in verbal agreement; Council shall avoid consensus by silence. 8. Council should not surprise Councilmembers or Staff with issues, questions, requests, or presentations at Council meetings. Should a Councilmember want to make a presentation or discuss an issue it should request to add an item to the respective agenda at the beginning of the meeting when the agenda is being approved. The Mayor, or in their absence the Mayor Pro Tem, is charged with presiding at meetings and maintaining proper decorum. If there is a disagreement with how a meeting is being conducted, those objections should be voiced politely and with reason following normal rules of procedure. AGENDA ITEM -3F -z4RZEN HILLS MEMORANDUM DATE: June 10, 2024 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Strategic Planning Discussion Follow-up Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Council should provide further guidance on how to move its strategic planning discussion forward. Background At the last worksession, the City Council discussed its strategic goals and made changes to the attached PowerPoint (Attachment A), the PowerPoint has been updated to reflect Council changes. Council will want to discuss and provide necessary direction to move the conversation forward. Budget Impact N/A Attachment Attachment A: Revised Strategic Goals Based on Category Attachment B: Council's Strategic Goals Page 1 of 1 Attachment A Strategic Goals • Natural Resources • Organized Collection • Sustainability • Rice Creek Commons • Public Safety • Development • Housing • QuaLityof Life • Communication Natural Resources • Complete inflow and infiltration (1&1) (1) • Environmental stewards to protect, maintain and preserve natural resources (109 41 17) • Water conservation, water quality and runoff, tree canopies, invasive species management, pollinator promotion, threatened and endangered species Organized Collection • Pursue organized collection (7) SustainabiLity • Lay the foundation for sustainability efforts (16) • Water conservation —water usage • City operations versus City-wide • Energy audit Rice Creek Commons/TCAAP • Complete TCAAP development agreement amongst all parties (5, 9, 14, 22) Public Safety • Proactive crime prevention, at risk youth programs, traffic safety signals, police outreach (3) • Public safety aligns with vision statement (11) • Build key trails, adequate facility for fire, and adequate HR for emergency services (adequate staffing for fire and police) • Implement a new fire station (8) • Two new trails in AH (6) Development • Meaningful vision for commercial zoning (18) Housing • Neighborhood support (monitor conditions, rental, housing stock, code enforcement?) (2) • Develop City codes and policies to modern tech (12) • Remove provisions for population density (19) • Increase availability of affordable housing (20) Quality of Life • Community development and integration of old and new (13) • Resident communication (23) • Align efforts to be family friendly (15) • Parks and trails Communication • Increase communication with elected officials, shared services (21) Attachment B 10 11 12 13 14 15 ill 17 im Councilmember Name Description of Goal Priority Brenda Holden Completion of 1&1 1 Brenda Holden Neighborhood Support (monitor conditions, rental, preservation of housing stock) 2 Brenda Holden Public Safety (proactive crime prevention, at risk youth programs, traffic safeey signals, police outreach) 3 Brenda Holden Environemntal Stewards 4 David Grant TCAAP Agreement amongst all parties (including council agreement on civic zoning) and get TCAAP started 1 Two new trails in AH (funding with some outside resources to enable David Grant completion) 2 Organized trash collection as a way to reduce air and noise pollution, David Grant maintain roads and hopefully lower costs. 3 David Grant Implement a new Fire Station (includes funding) 4 Growth through RCC - Promote community- aligns with vision statement- strong Emily Rousseau residential neighborhoods and CV Strong neighborhoods and businesses - Encourage business success and diversity -aligns with vision statement - vital business community and aligns with CV Strong neighborhoods and businesses 1 Preserve and Protect our Natural resources -aligns with Vision - desirable city in Emily Rousseau which to live, work and play, unique environmental setting & CV - Environmental awareness and stewardship - Land management program -to consider focusing on canopy, raingardens, invasive species management and pollinator promotion 2 Public Safety- aligns with vision statement - a desirable city in which to live, work and play & aligns with CV - Efficient and effective police and fire protection - Build key Emily Rousseau trails that increase public safety (Old HWY 10 and LJB) - Adequate facility for FD - Adequate Human Resources available for emergency services (RCSO contract, appropriate staffing for FD) 3 Develop city codes and policies relevant to modern technology, use current information and values of current residents. - aligns with vision of strong residential neighborhoods, vital business community and a desirable city in which to live, work Emily Rousseau and play & multiple core values - Update our city codes through work identified by consultant in 2024 - Implement a Pollinator Protector Policy as recommended in '22 by the PTRC - Consider review of landscaping ordinance - is this effective for encouraging native plants, would a Do Not Exceed Turf Percentages clause be valuable? 4 Emily Rousseau Community development and integration of old and new - Incorporate standards for RCC into existing city's standards 5 Tena Monson Develop and construction TCAAP 1 Tena Monson Align forward looking efforts to be more family friendly (parks and rec, programs, spend, trails, etc) ensure foundation of what we do is supporting families 2 Tena Monson Laythe foundation of sustainabilityfor all of our efforts. Integrate the clean energy and sustainability into all of our processes 3 Tena Monson Maintaining and enhancing our natural resources in the city (canopy etc). This could be folded into #3 if we do it right. 4 Tena Monson Create a meaningfulvision forthe development of our commercial zones 5 19 Pill 21 22 23 Improve the residential landscape of Arden Hills by removing provisions in the Tom Fabel Comprehensive Plan and the Zoning Code which prohibit or unduly restrict population density. 1 Improve the residential landscape of Arden Hills by promoting an increased Tom Fabel availability of affordable housing and requiring a minimal percentage of affordable housing in all residential development proposals. 2 Increase the frequency of communications with elected officials of Tom Fabel surrounding communities, including explorations of shared service opportunities. 3 Modify any existing city policy, comprehensive plan requirement, or Tom Fabel zoning provision which stands in the way of or unduly impedes a successful development of Rice Creek Commons. 4 Brenda Holden Resident communication 5 AGENDA ITEM - 3G 'It EN HILLS MEMORANDUM DATE: June 10, 2024 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Rice Creek Commons/TCAAP Discussion Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A For Council Consideration Council will have the opportunity to comment on any TCAAP related items they so choose. Background N/A Budget Impact N/A Attachment N/A Page 1 of 1 AGENDA ITEM - 3H -t1 DEN HILLS MEMORANDUM DATE: June 10, 2024 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Agenda Planning Budgeted Amount: Actual Amount N/A N/A Council Should Consider Council should discuss its next worksession agenda. Background Funding Source: N/A Per Council's adopted policy on agenda setting, please find proposed agendas below for upcoming meetings. Due dates have not been added to the below items, but will be as the process evolves. June 24th Worksession • Planning Consultant Kickoff (time sensitive) • Old Highway 10 Trail Design Discussion (time sensitive) • Great River Greening Update (not time sensitive) • RCC/TCAAP Discussion (not time sensitive) • Agenda Planning (time sensitive) July 8th Worksession • Compensation Study Update (time sensitive — August 2024) • Tobacco Moratorium (time sensitive — November 2024) • Encroachment Discussion (not time sensitive) • RCC/TCAAP Discussion (not time sensitive) • Agenda Planning (time sensitive) Page 1 of 2 Attached is the list of topics that have yet to be discussed by Council. Council may want to discuss if any items need to be added to this list for future discussion or assign a future meeting for some of these items. This would need to be done by a majority consensus of Council. Below is a running list of things Staff brings forward to worksession annually, in recent years, we have shifted away from bringing some items forward unless needed, such as, the Pavement Management Update from Public Works. Note, these timelines may shift year to year. Most items discussed at worksessions are one-off items that may require multiple meetings, but are usually not reoccurring. • January o Legislative priorities • February o None • March o Initial guidance on next year's Public Works projects • April o None • May o None • June o Follow up on next year's Public Works projects • July o Capital improvement planning • August o Operating budgets • September o Operating budget and levy discussion • October o State of the City (if planned for early following year) • November o City-wide budget and fee schedule o Follow up on next year's Public Works projects • December o Committee and commission appointments Budget Impact N/A Attachment Attachment A: Council Priorities Attachment B: Agenda Setting Policy Page 2 of 2 Attachment A Rank Topic for Consideration Notes 1 Committee/Commission Goal Setting Admin TBD 1 Short-term Rental Ordinance CD/Admin TBD 2 Rental Licensing Program CD/Admin TBD 3 Volunteer Recognition (to Personnel first) Admin TBD 3 Infill Development CD TBD 3 Speed Limit Old Snelling PW TBD 3 Trail Prioritization (Lake Jo versus Snelling Ave N) PW/Fin TBD 4 Council Salaries Admin TBD 4 Climate Action Plan Admin TBD 4 Committee/Commission Membership Admin TBD 4 Building Materials Update/Discussion CD TBD 4 EV Fleet Analysis PW TBD 5 Energy audit Admin TBD 5 Porta potties PW TBD 6 EDA Membership Discussion CD/Admin Future EDA meeting 7 Communi Survey Admin IT13D 7 Keeping of Ducks CD/Admin TBD Added items: Proclamation Policy Garbage Collection (MV Presentation?) Committee/Commission Liaison Role Policy Code of Conduct Attachment B 'It EN HILLS CITY OF ARDEN HILLS Agenda Setting Policy The purpose of this policy is to establish a method for agenda setting that allows for Council to review and have control over its agendas and decide as a Council how it wants items for consideration to be brought forward. For regular worksession agendas: • Prior to concluding each regularly scheduled worksession, the City Council shall review its next regularly scheduled worksession agenda and direct Staff on any changes. • Should an individual Councilmember want to raise an item for discussion at the next meeting or in the future, they would do so during this review period. The item would need at least one other Councilmember to agree to having the item considered for future discussion, and then Council, by majority, would direct to have it placed on a future agenda or not. • Staff will have flexibility to add or remove items to the worksession as needed to maintain operational efficacy. For regular City Council meeting agendas: • Agendas will be largely Staff driven based on approvals needed for normal operations. • Items coming from the City Council shall first be discussed at a worksession and can direct Staff at said worksession to bring items forward for formal approval if needed. • In rare instances, if a Councilmember brings forward an item that needs approval prior to going to a worksession, they may request the City Administrator add the item to the agenda. The City Administrator shall have the discretion to determine if the issue should be added or not, but Councilmembers will make every effort to having the item first discussed at a worksession. Special meetings and emergency meetings: • Special meetings and emergency meetings may still be called at the discretion of the Mayor or any two Councilmembers, and the members calling the meeting shall set the agenda.