Loading...
HomeMy WebLinkAbout07-22-24-RMayor: Address: David Grantlt 1245 W Highway 96 Arden Hills MN 55112 HILLS Councilmembers: ,-A EN Phone: Brenda Holden 651-792-7800 Emily Rousseau Regular City Council Tena Monson Website: Tom Fabel Agenda www.cityofardenhills.org July 22, 2024 7:00 p.m. City Hall City Vision Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long-standing tradition as a desirable City in which to live, work, and play. Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City's website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills. https://cityofardenhills.orci/320/Watch- City-Meetings This meeting will be streamed live on local Cable Channel 16 and available for playback on our website. CALL TO ORDER 1. APPROVAL OF AGENDA 2. TCAAP/Rice Creek Commons Update Dave Perrault 3. PUBLIC INQUIRIES/INFORMATIONAL This is an opportunity for citizens to respectfully bring to the Council's attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting. 4. RESPONSE TO PUBLIC INQUIRIES 5. PUBLIC PRESENTATIONS 6. STAFF COMMENTS 6.A. Transportation Update David Swearingen, Public Works Director/City Engineer Documents: MEMO.PDF 6.B. Night To Unite Update And Proclamation Julie Hanson, Assistant to the City Administrator/City Clerk Documents: MEMO.PDF ATTACHMENT A.PDF 6.C. Elections Update Julie Hanson, Assistant to the City Administrator/City Clerk Documents: MEMO.PDF 7. APPROVAL OF MINUTES 7.A. June 17, 2024 Special Joint Work Session Documents: 06-17-24 - JOINT WS.PDF 7.13. June 24, 2024 Special City Council Work Session Documents: 06-24-24-SWS.PDF 7.C. June 24, 2024 Regular City Council Documents: 06-24-24-R.PDF 8. CONSENT CALENDAR Those items listed under the Consent Calendar are considered to be routine by the City Council and will be enacted by one motion under a Consent Calendar format. There will be no separate discussion of these items, unless a Councilmember so requests, in which event, the item will be removed from the general order of business and considered separately in its normal sequence on the agenda. 8.A. Motion To Approve Claims And Payroll Joua Yang, Finance Director Pang Silseth, Accounting Analyst Documents: MEMO.PDF 8.B. Motion To Approve 2nd Quarter Financials Joua Yang, Finance Director Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF 8.C. Motion To Approve An Outdoor Concert License And Miscellaneous Permit For MN Building And Construction Trades - Ribfest Event At The Red Bulls Facility On September 21, 2024 Julie Hanson, Assistant to the City Administrator/City Clerk Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 8.D. Motion To Approve Acknowledgment Of The Application Of MN Building And Construction Trades For An Exempt Permit To Conduct A Raffle With No Waiting Period - Ribfest Event At The Red Bulls Facility On September 21, 2024 Julie Hanson, Assistant to the City Administrator/City Clerk Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 8.E. Motion To Approve Amendment To Urban Requalification Joint Cooperation Agreement - CDBG Jessica Jagoe, Community Development Director Documents: MEMO.PDF ATTACHMENT A.PDF 8.F. Motion To Approve Resignation Of City Administrator Julie Hanson, Assistant to the City Administrator Documents: MEMO.PDF 8.G. Motion To Approve Appointment Of Interim City Administrator Dave Perrault, City Administrator Documents: MEMO.PDF 8.H. Motion To Approve Payment No. 1 - 2024 CIPP Lining Project - Hydro-Klean, LLC Lucas Miller, Assistant Public Works Director Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 8.1. Motion To Approve Cooperative Agreements With Great River Greening - Park Habitat Management (Hazelnut Park/Chatham Park And Floral Park) David Swearingen, Public Works Director/City Engineer Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 8.J. Motion To Approve $141,472.00 Quote From GMH Asphalt For Large Area Patching - 2024 Street Maintenance Program David Swearingen, Public Works Director/City Engineer Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 9. PULLED CONSENT ITEMS Those items that are pulled from the Consent Calendar will be removed from the general order of business and considered separately in its normal sequence on the agenda. 10. PUBLIC HEARINGS 10.A. Planning Case 24-009 - Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, And Site Plan Review - Lake Johanna Fire Department - 3535 Pine Tree Drive Jessica Jagoe, Community Development Director Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF ATTACHMENT E.PDF ATTACHMENT F.PDF ATTACHMENT G.PDF ATTACHMENT H.PDF ATTACHMENT I.PDF ATTACHMENT J.PDF ATTACHMENT K.PDF ATTACHMENT L.PDF ATTACHMENT M.PDF 10.B. Planning Case 24-014 - Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, And Site Plan Review - Event Center - 3776 Connelly Avenue Jessica Jagoe, Community Development Director Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF ATTACHMENT E.PDF ATTACHMENT F.PDF ATTACHMENT G.PDF ATTACHMENT H.PDF ATTACHMENT I.PDF ATTACHMENT J.PDF ATTACHMENT K.PDF ATTACHMENT L.PDF ATTACHMENT M.PDF ATTACHMENT N.PDF ATTACHMENT O.PDF ATTACHMENT P.PDF ATTACHMENT Q.PDF 11. NEW BUSINESS 11.A. Resolution 2024-037 Approving Conditional Use Permit - Master Planned Unit Development, Final Planned Unit Development And Site Plan Review - Lake Johanna Fire Department - 3535 Pine Tree Drive - Planning Case 24-009 Jessica Jagoe, Community Development Director Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF 11.B. Planning Case 24-014 - Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, And Site Plan Review - Event Center - 3776 Connelly Avenue o Ordinance 2024-007 Amending Chapter 13 Concerning an Event Center Use in the B-2 General Business District and Summary Ordinance o Resolution 2024-038 Approving Conditional Use Permit for 3776 Connelly Avenue Jessica Jagoe, Community Development Director Documents: MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF 12. UNFINISHED BUSINESS 13. COUNCIL/STAFF COMMENTS ADJOURN STAFF COMMENTS - 6A ,-ARZENHILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: David Swearingen, Public Works Director/City Engineer SUBJECT: Transportation Update Budgeted Amount: Actual Amount: Funding Source: A verbal update will be provided at the City Council meeting. Page 1 of 1 STAFF COMMENTS - 6B ,-ARZENHILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Julie Hanson, Assistant to the City Administrator/City Clerk SUBJECT: Night to Unite Update and Proclamation Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Acknowledgement of the attached Proclamation supporting Night to Unite 2024. Background/Discussion Night to Unite will be held on Tuesday, August 6 from 5:00 to 9:00 pm. While the formal registration deadline was Friday, July 12; interested parties may still register as the Ramsey County Sheriff's Office will try its best to accommodate, but cannot guarantee, a visit by a deputy for late registrations. That said, events can expect a visit from other community individuals. Please note that as of July 16 there were 16 registered events. Staff will provide the City Council with a verbal update at the July 22 City Council meeting and will also provide the list of event locations once received from the Ramsey County Sheriff's Office. This list will also be published on the City's website. In addition, attached for Council's acknowledgement is a Proclamation provided by the RCSO regarding Arden Hills' support of Night to Unite. Please note school supplies donations can be brought to a local neighborhood event or dropped off at City Hall Mondays through Thursdays between 7:30 am and 5:00 pm or Fridays from 7:30 am to 11:30 am until Friday, August 9. Items can also be dropped off at the Ramsey County Sheriff's Patrol Station, 1411 Paul Kirkwold Drive, between 8 am and 4:30 pm Monday, August 5 through Friday, August 9. Budget Impact N/A Attachments Attachment A: Proclamation Page 1 of 1 Night to Unite 2024 Proclamation CITY OF ARDEN HILLS NIGHTtoUNITE! Neighbors Joining Together WHEREAS, the Minnesota Crime Prevention Association, along with local law enforcement agencies are sponsoring a statewide program called Night to Unite on August 6, 2024; and WHEREAS, Night to Unite is designed to get to know one another in the City of Arden Hills, build neighborhood involvement by bringing police and communities together; and to bring an awareness to crime prevention and local law enforcement efforts; and WHEREAS, Night to Unite supports the idea that crime prevention is an inexpensive, effective tool in strengthening police and community partnerships; and WHEREAS, Night to Unite provides opportunities to celebrate the ongoing work of law enforcement and neighborhoods in Arden Hills by working together to fight crime and victimization and increase public safety for all citizens; and WHEREAS, the citizens of Arden Hills play an important role in assisting the Ramsey County Sheriff's Office through joint crime, drug and violence prevention efforts; NOW, THEREFORE, I, Mayor David Grant, and WE, Council Members, Thomas L Fabel, Brenda Holden, Tena Monson, and Emily Rousseau, DO HEREBY CALL UPON ALL CITIZENS OF ARDEN HILLS, RAMSEY COUNTY, to participate in Night to Unite on Tuesday, August 6, 2024. FURTHER, LET IT BE RESOLVED THAT I, Mayor David Grant, and WE, Council Members, Thomas L Fabel, Brenda Holden, Tena Monson, and Emily Rousseau, do hereby proclaim Tuesday, August 6, 2024, as Night to Unite in Arden Hills, Ramsey County, Minnesota. Mayor, David Grant Council Member, Thomas L Fabel Council Member, Tena Monson July 22, 2024 Date Council Member, Brenda Holden Council Member, Emily Rousseau Attested by: City Administrator, Dave Perrault STAFF COMMENTS - 6C ,-ARZENHILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Julie Hanson, Assistant to the City Administrator/City Clerk SUBJECT: Elections Update Budgeted Amount: Actual Amount: Funding Source: A verbal update will be provided at the City Council meeting. Page 1 of 1 �-`iVEN HILLS Approved: July 22, 2024 CITY OF ARDEN HILLS, MINNESOTA JOINT CITY COUNCIL WORK SESSION WITH CITY OF MOUNDS VIEW JUNE 17, 2024 5:30 P.M. — MOUNDS VIEW CITY COUNCIL CHAMBERS CALL TO ORDER/ROLL CALL Pursuant to due call and notice thereof, Mounds View Mayor Lindstrom called to order the Special Joint Work Session at 5:30 p.m. Present: Arden Hills Mayor David Grant (virtually); Mounds View Mayor Zach Lindstrom, Arden Hills Councilmembers Tom Fabel, Tena Monson, and Emily Rousseau, Mounds View Councilmembers Gary Meelhause, Julie Clark, and Theresa Cermark Absent: Arden Hills Councilmember Brenda Holden and Mound View Councilmember Sherry Gunn Also present: Arden Hills City Administrator Dave Perrault; Mounds View City Administrator Nyle Zikmund, Arden Hills Recreation Supervisor Matt Johnson, Mounds View Assistant City Administrator Brian Beeman, Mounds View Public Works Director Don Peterson, Mounds View School District Superintendent Chris Lennox, Mounds View School District Director of Community Education Karl Brown, Mounds View Recreation Superintendent Andy Thomas, Shawn O'Keefe and James O'Keefe (Minnesota Tournament and Wellness Center), Ramsey County Commissioner Nicole Frethem AGENDA ITEMS 1A. Introductions/Roll Call A roll call for members was conducted. 1B. Joint Park and Recreation Staff from Arden Hills and Mounds View gave an overview of programs and options that the cities are currently collaborating on and opportunities for collaboration in the future. Mounds View School District Community Education Director Brown noted the programming discussed aligns well with the school district programming, and he believed they are not duplicating efforts or having competing programming. JOINT CITY COUNCIL WORK SESSION — JUNE 17, 2024 2 Arden Hills Recreation Supervisor Johnson noted about half of the programs offered by Arden Hills are collaborative. Mounds View Superintendent Thomas noted additional collaboration with recreation programming is happening this fall. The two Councils thanked the Recreation Staff for their presentation and encouraged future collaboration. 1C. Development Project Shawn and James O'Keefe of the Minnesota Tournament and Wellness Center gave an overview of a tournament facility they are pursuing in the northern suburbs, they stated the area it would primarily serve is north of Saint Paul and east of Minneapolis. They noted it is a private, for -profit entity that would be running the project. They noted the initial capital outlay for the project is $100 million, which they are seeking a fifty-fifty split between private and public funding. They estimated the economic impact to the area would be over $23 million annually. Mounds View City Administrator Zikmund noted they have been building a coalition of partners who are interested in the project, and the next step is site selection and discussed the possibility of the project going on Rice Creek Commons. James O'Keefe noted they need a minimum of twenty acres but could utilize up to forty acres. Community Education Director Brown discussed the challenges regarding limited field space at the schools and being dependent on good weather and how this facility would benefit the school district. Mounds View City Administrator Zikmund discussed next steps including setting up a future meeting with Alatus for collaboration on Rice Creek Commons. James O'Keefe highlighted the opportunities for ongoing use of the facility by the surrounding communities for reasonable fees due to the initial public investment in the project. 1D. Organized Trash Collection City of Arden Hills Councilmember Monson and Mayor Grant noted the Arden Hills Council has discussed organized collection and is interested in learning more and hearing about Mounds View's experience. Mounds View Mayor Lindstrom gave an overview of Mounds View's experience with the organized collection process. In his opinion, the core issue with organized collection is the discrepancy in rates between customers and the fees and surcharges that are added to customers' bills. The other members of the Mounds View City Council discussed organized collection and the challenges they have been facing as they navigate the process. JOINT CITY COUNCIL WORK SESSION — JUNE 17, 2024 ADJOURN Mayor Lindstrom adjourned the Joint Council Work Session at 7:49 p.m. Julie Hanson City Clerk David Grant Mayor �-`iVEN HILLS Approved: July 22, 2024 CITY OF ARDEN HILLS, MINNESOTA SPECIAL CITY COUNCIL WORK SESSION JUNE 24, 2024 5:00 P.M. - ARDEN HILLS CITY COUNCIL CHAMBERS CALL TO ORDER/ROLL CALL Pursuant to due call and notice thereof, Mayor Grant called to order the Special City Council Work Session at 5:00 p.m. Present: Mayor David Grant; Councilmembers Tom Fabel, Brenda Holden (arrived at 5:10 p.m.), Tena Monson and Emily Rousseau Absent: None Also present: City Administrator Dave Perrault; Public Works Director/City Engineer David Swearingen; Community Development Director Jessica Jagoe; Finance Director Joua Yang; and Assistant to the City Administrator/City Clerk Julie Hanson 1. PUBLIC INQUIRIES/INFORMATIONAL None. 2. RESPONSE TO PUBLIC INQUIRIES None. 3. AGENDA ITEMS A. Zoning and Subdivision Ordinance Review Kick -Off Discussion Rita Trapp, HKGi, provided the Council with preliminary information on the zoning and subdivision ordinance code update process. She introduced herself, her firm along with her team, and explained she looks forward to working with the City on this project. Jason Zimmerman, HKGi, described HKGi's approach for this project noting the different phases, provided observations from the City's current code and reviewed the online survey comments he received from the Council regarding the City's zoning and subdivision ordinance. He discussed how community engagement would be held with the public and reviewed the ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — JUNE 24, 2024 2 project timeline. He noted several joint meetings would be scheduled with the Planning Commission to work through the draft ordinance. Mayor Grant discussed how the Planning Commission helps the City Council carry out City Code. He recommended the Phase 2 joint meeting with the Planning Commission be held between City Council and HKGi for efficiency purposes. Mr. Zimmerman explained the joint meeting in Phase 2 helps to provide the Planning Commission with direction from the City Council. Councilmember Rousseau stated she supported the proposed project timeline and joint meetings. She asked if HKGi has connected with staff and did the City have resources to meet the proposed project timeline. Community Development Director Jagoe indicated she supported the proposed project timeline. Councilmember Holden questioned what kind of technical training the Planning Commission was receiving. Community Development Director Jagoe explained the Planning Commission receives orientation training which addresses land uses, zoning code, CUP's, and statutory requirements. She indicated many have attended League of Minnesota Cities webinars as well. Councilmember Holden stated she was concerned with the fact the training was not inclusive but rather was very restrictive given the fact members were appointed by the new Council. She expressed concern with the fact the Planning Commission was supposed to provide technical support to the Council and this may not be fully understood because many of the members were quite new. Mr. Zimmerman reported this could be further addressed at the first joint meeting with the Planning Commission. Ms. Trapp discussed how she would bring technical information to the City Council, Planning Commission and staff for consideration to ensure everyone has the same information. Councilmember Monson noted the first meeting with the Planning Commission would be very important because this would address the subdivision rewrite. She explained the vision from the Council for the Planning Commission would be really important. She stated she was very comfortable with the project plan and timeline as laid out by HKGi. She was of the opinion the Planning Commissioners were very skilled and experienced. She trusted the Planning Commission to be able to work through the technical pieces with City staff and HKGi. Councilmember Fabel asked if Constitutional or legal issues ever arose while rewriting portions of code and if this were to occur, how would it be addressed. Mr. Zimmerman indicated they watch for certain red flags, especially with respect to sign code and shoreland ordinances. He stated he would be watching these sections to ensure the language was current. ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — JUNE 24, 2024 Councilmember Fabel questioned if HKGi had an attorney on staff to review the code revisions. Ms. Trapp reported all legal questions would be referred to the Arden Hills city attorney. She did not anticipate she would need a great deal of legal counsel for this code rewrite. Mayor Grant discussed how the code rewrite would address inconsistencies as well as the duplication of information. He anticipated that when the new code was complete, a clean, easy and readable document would be created. He noted this document would not be a complete rewrite. Ms. Trapp stated from her standpoint a rewrite isn't throwing out the code, but rather she would read through current code to ensure it was accurate to State Statute and Council policies, while also remaining clear to outside readers. She indicated every portion of code would be read through and clarified but would not be completely rewritten from scratch. Mayor Grant appreciated the fact that the new code language would be easy to read for outside readers and developers. Councilmember Holden indicated the current code has conflicts. She questioned if the new code would ensure conflicts do not occur. Mr. Zimmerman reported any future amendments have to be researched, but he anticipated future amendments would have logical places to go which would assist with proper organization while minimizing the chances for conflicts. Councilmember Rousseau stated she could support a total rewrite of certain portions of code, if necessary. Councilmember Monson inquired how short-term rentals and ADU's would be included in this proj ect. Ms. Trapp hoped to understand these topics at the first meeting with the Council and Planning Commission. She indicated the code would be structured in such a manner that if these items needed to be addressed or added later, there would be a place within code. Councilmember Holden stated the City had no rental policy at all. She explained she would like to address this matter, along with short term rentals. Further discussion ensued regarding the code revision process. Mayor Grant asked if there would be a reference to State Statute within the code. Ms. Trapp reported this would occur, but noted in some instances it was valuable to have State Statute spelled out within the code for readers. Mr. Zimmerman reviewed the next steps for this project which included a tour of the city, code review and analysis, project webpage, public input and a joint meeting this fall. ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — JUNE 24, 2024 4 Councilmember Monson looked forward to closing the gap on how people function and operate today, versus when the code was originally drafted. Mr. Zimmerman indicated the code would be modernized through this process. Councilmember Holden asked how home occupations would be addressed within the code. Ms. Trapp reported she would work to strike a balance within the code noting every city had a different level of staffing and care when it comes to this issue. She thanked the Council for all of their feedback and noted she looked forward to meeting with the Council again this fall. B. Old Highway 10 Trail Improvements — Design Review and Funding Discussion Public Works Director/City Engineer Swearingen stated in October of 2022, a feasibility study update was completed from a previous 2008 version of the proposed project corridor. On June 12, 2023, City Council approved Professional Services with Engineering Consultant, SRF, to complete a "Shovel -Ready" design to pursue potential future funding opportunities. On November 27, 2023, City Council requested a proposal from SRF to apply for potential grant programs related to the proposed Old Highway 10 Trial Improvement project, which included the MnDOT SRTS program and Regional Solicitation SRTS program. SRF has produced plans considered 95%. He noted Mike McGarvey from SRF was in attendance to discuss these plans. Mike McGarvey, SRF, discussed the Highway 10 trail improvements with the Council. He noted he met with the Council last November noting he was 60% complete with plans. He commented on the project noting it would include an eight to ten foot wide bituminous trail along the west/south side of Old Highway 10. In addition, there would be approximately 500' of boardwalk and railing, necessary storm sewer improvements, and retaining walls to minimize impact to wetlands, minor adjustments to grading and hard surface due to impacted boulevard space. He reviewed the project timeline as well as the cost estimates. He commented further on the grant funding opportunities that were pursued. He explained the City did not receive MNDOT SRTS funding. He noted he was still waiting to hear back on the Regional Solicitation SRTS program, but noted funding was unlikely. He reviewed potential next steps and other funding sources that could be pursued by the City for this trail improvement project and asked how the Council wanted to proceed. Councilmember Monson supported the City speaking with the Mounds View High School in order to pursue an SRTS plan. She suggested other grant opportunities also be considered. She commented on how a Parks Master Plan would benefit the City in pursuing grants for park improvements. She supported the Council further discussing a Parks Master Plan at a future worksession meeting. Mayor Grant asked if this trail was on the current Parks Master Plan from 2000. Public Works Director/City Engineer Swearingen stated there was a line on a piece of paper saying this trail was proposed. Councilmember Holden indicated this trail may have been included on the 2010 Parks Master Plan. ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — JUNE 24, 2024 5 Public Works Director/City Engineer Swearingen explained he was uncertain what Councilmember Holden and Mayor Grant were referring to. Councilmember Monson stated whatever the City has in place now, may be fine, but noted an update may be required to address the vision for the community going forward. Councilmember Fabel questioned how ongoing investment relates to the prospect of Johanna Boulevard trail or Snelling Boulevard trail. Public Works Director/City Engineer Swearingen explained the City has taken the lead on the Old Highway 10 project and the County has taken the lead on the Johanna Boulevard trail. He indicated these were competing projects that had pursued separate grant opportunities. Mayor Grant stated there was some value in going through the current Parks Master Plan, especially to provide updates to the trail connections. He understood there were two costly trail sections that needed to be completed. Councilmember Rousseau indicated she supported the City Council completing a Parks Master Plan. She questioned why the Mounds View High School has not created an SRTS plan in the past. Mr. McGarvey stated he was uncertain why this had not been completed by the school. He reported the trail along Lake Valentine Road was successful without a SRTS plan. Councilmember Rousseau explained she would be interested in sharing the results from the SRTS grant funding with the school along with discussing how important support from the school district would be to the City. Councilmember Holden stated the City may be asking for too much right now. She did not believe the City would receive any funding because all of the asks did not look appropriate. She commented on how the upcoming election may impact future funding requests. She questioned how many residents south of I-694 were walking to the high school. Mr. McGarvey indicated he did not have the numbers in front of him, but noted the project scored well relative to the broader scope of the project and that there would be a connection to Arden Manor. Councilmember Holden asked how much of this roadway was considered City versus County. Public Works Director/City Engineer Swearingen reported all of the roadway was owned by the County. Mayor Grant commented in the more detailed write up, the County's contribution for this project was to be $500,000, but the County was not able to make this commitment. Public Works Director/City Engineer Swearingen explained the County's policy states they will match 50% of the overall costs for a project, however, at this time, they did not have funding to meet their policy, which meant the County would be providing $550,000 for this project. ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — JUNE 24, 2024 6 Mayor Grant indicated there was discussion within the writeup about MSA funding. Public Works Director/City Engineer Swearingen reported the City could advance up to five years in MSA funding. Mayor Grant stated this would give the City $1.5 million, but noted the City was already in the hole. Public Works Director/City Engineer Swearingen indicated this was the last year the City would not be receiving funding. He stated next year the City would resume receiving MSA funding. City Administrator Perrault commented he believed the City's MSA funding was spoken for, for years into the future. He noted the City would be eligible to begin receiving MSA again in 2025. Mayor Grant indicated he would like more clarification regarding the City's MSA funding. Councilmember Fabel asked what the budgetary impact would be of a complete streets policy. Mr. McGarvey explained a complete streets policy would have the City enacting a policy that addresses how the City develops its roadway networks and has all modes of transportation being considered. He indicated this policy would strengthen the City's commitment to all modes of transportation. Mayor Grant supported the City working with the school district in order to improve the City's application for funding. Councilmember Holden asked if the City's best funding option was the SRTS. Mr. McGarvey stated this would be the City's next funding opportunity, along with the Safe Routes for All program. Councilmember Holden supported the City pursuing SRTS funding again this fall and recommended the City update its trail map. She suggested the City consider pursuing a complete streets policy as well as this would give the City a few more points for its project. City Administrator Perrault clarified that the City had a parks maintenance plan in place and not a Parks Master Plan. Mayor Grant reported a Parks Master Plan was completed in 2000 noting he borrowed a copy of this document from Public Works Director/City Engineer Swearingen. He noted this document states it will take 20 years to complete this plan. Councilmember Monson discussed how she would support spending $50,000 on a Parks Master Plan as this would assist the City with receiving future grant funding for projects and not just this one. ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — JUNE 24, 2024 7 C. Recap of Joint Meeting with Mounds View City Council City Administrator Perrault stated on June 17th, the City Council met with the Mounds View City Council for a joint worksession, the agenda covered joint recreation activities, a tournament facility, and single -hauler trash and recycling. Staff provided a brief summary of the following items and asked for any additional follow-up from Council. Councilmember Fabel commented on the large sports facility Mounds View was considering and how they were looking for space in Arden Hills. He noted TCAAP may be a possibility for this space. Councilmember Holden asked if this project would be taxable. City Administrator Perrault explained this project would be owned privately which meant it would be taxable. Councilmember Holden discussed how the proposed sports facility would be a draw if built within TCAAP. Councilmember Monson stated she was interested in learning more about the sports facility. She understood Mounds View wanted public/private funding for this venture, but she believed the school district may be interested in participating in funding this project. She supported the JDA exploring this project further. Councilmember Holden indicated Arden Hills was missing a facility to hold recreational programming. Mayor Grant explained there was a lot of positives for the recreational facility. He noted this facility would bring in tourism and would be a positive for the Rice Creek Commons development. He believed the City of Arden Hills, the school district and Mounds View would all benefit from this project. He commented further on the benefits of having a regional sports facility in Arden Hills. He believed the State would be a partner for a project like this. He indicated his concern was with how many additional trips would be generated by this facility. City Administrator Perrault stated the next step would be to bring the partners in to provide the Council with a preliminary presentation. Councilmember Rousseau suggested this presentation be made after the partners speak with Bob Lux. She indicated she thought the sports facility was an interesting idea and she looked forward to learning more. The City Council recessed the special worksession until after the regular City Council meeting at 6:53 p.m. The City Council reconvened the special worksession at 8:45 p.m. Mayor Grant provided a short recap of the discussion held prior to the regular City Council meeting, stating there was positive general consensus regarding a sports facility. He noted that a ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — JUNE 24, 2024 8 sports facility offers advantages that Costco would not offer and if Alatus wants vibrancy in the downtown area, this would provide that though it comes with a price tag. A discussion ensued about what a potential sports facility could include and potential next steps. A discussion ensued regarding potential impacts on zoning, including the JDA's role in the decision making process for a potential sports facility. Council consensus was to direct staff to continue collecting information and to invite the partners that are proposing the sports facility to present to the City Council at a future worksession. Staff was directed to add this to the list of potential future topics. City Administrator Perrault explained possible next steps in moving forward with a potential single hauler for the city. He suggested waiting until the recycling RFP process that is being facilitated by the technical advisor, Foth, is complete before making a decision regarding a single trash hauler. He explained there will be a timing component to implementing a single trash hauler along with a recycling hauler. He reiterated he would prefer to wait to address the single trash hauler issue until a new recycling contract is put in place. Councilmember Holden asked about the planning process and if public engagement would be included. City Administrator Perrault suggested waiting for Foth to provide assistance with the process and noted that public participation could be a component should Council want to include such. Discussion ensued about the options of a referendum or survey regarding a single hauler in order to gauge public interest, road conditions and the effects of multiple haulers versus a single hauler, and Mounds View's experience with the process. Discussion ensued regarding the varying fees that garbage carriers charge and that the State has mandated the process cities must follow during consideration of implementing a single hauler. Councilmember Holden suggested the Council have an internal process figured out prior to engaging the public with a survey. Councilmember Monson asked about timing and if the Council would be in favor of revisiting this topic following completion of the recycling RFP, such as in January. Council briefly discussed the fact that the TCAAP redevelopment will be a single hauler. City Administrator Perrault stated that if Council agreed, staff could bring the process back for discussion following completion of the recycling RFP, so January at the latest, and Council could determine at that time if it wants to pursue a single hauler in 2025 or 2026. Councilmember Holden stated that could work if the recycling contract is for 3 years but not if it is for 5 years. ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — JUNE 24, 2024 9 Councilmember Rousseau agreed that waiting to discuss in January was a good plan, and she noted several other tasks that are on the horizon for discussion such as strategic goals, the Master Parks Plan, Zoning ordinance revisions and the budget. D. Code of Conduct This item was postponed to a future meeting. E. Rice Creek Commons/TCAAP Discussion This item was postponed to a future meeting. F. Agenda Planning City Administrator Perrault provided proposed agendas for upcoming meetings as noted below. Due dates have not been added to the below items but will be as the process evolves. July 8th Worksession • Compensation Study Update (time sensitive — August 2024) • Great River Greening Update (not time sensitive) • Tobacco License Moratorium (time sensitive — November 2024) • RCC/TCAAP Discussion (not time sensitive) • Agenda Planning (time sensitive) July 22nd Worksession • Capital Budget Planning (time sensitive) • Capital Funding Update (time sensitive) • Encroachment Update (not time sensitive) • RCC/TCAAP Discussion (not time sensitive) • Agenda Planning (time sensitive) Mayor Grant explained a suggestion that was made to him regarding the City having a free day or weekend in which residents can give something away, similar to the "buy nothing" groups. City Administrator Perrault noted the recycling RFP includes scenarios for two alternate bids, one would include hosting a Clean Up Day similar to what the City used to do but would be run by the carrier and a second to include a curbside bulk pickup service free to residents on a certain date to be decided upon by the Council, though he cautioned this second option could be expensive for the City. A short discussion ensued regarding these two options. Councilmember Monson noted she had asked to discuss the chicken ordinance and fire fighter recognition. Councilmember Rousseau stated it was discussed having Representative Moller or Senator Marty present to speak at a Council meeting. ARDEN HILLS SPECIAL CITY COUNCIL WORK SESSION — JUNE 24, 2024 10 Councilmember Holden indicated the City has always traditionally invited local representatives to attend a Council meeting, noting this is an election year. Council consensus was to invite the elected officials to speak at a future Council meeting prior to the November election. City Administrator Perrault asked to clarify Council direction regarding if the intent was for local public safety representatives to be invited to attend a work session, which was more informal and traditionally when they would speak, and the elected officials would be invited to attend a regular City Council meeting to provide a formal public presentation. He noted that both meetings are being televised. Councilmember Rousseau stated she would prefer all representatives provide a presentation at a regular Council meeting. The Council concurred with having a formal presentation at a regular meeting. Discussion ensued about the desired topics from the Lake Johanna Fire Department (LJFD) and Ramsey County Sheriff's Office (RCSO). Councilmember Holden requested City Administrator Perrault provide the contracts with LJFD and RCSO to the City Council. A short discussion ensued regarding bonding and potential options the City could pursue. Council agreed to add legislative priorities to the August work session. Discussion ensued regarding leaving the topics as listed on the July 81h work session on that agenda and code of conduct and Arden Manor hardcourt were added as well. 4. COUNCIL COMMENTS AND STAFF UPDATES None. ADJOURN Mayor Grant adjourned the Special City Council Work Session at 9:45 p.m. Julie Hanson City Clerk David Grant Mayor ,-`ik�EN HILLS Approved: July 22, 2024 CITY OF ARDEN HILLS, MINNESOTA REGULAR CITY COUNCIL MEETING DUNE 24, 2024 7:00 P.M. - ARDEN HILLS CITY COUNCIL CHAMBERS CALL TO ORDER/ROLL CALL Pursuant to due call and notice thereof, Mayor David Grant called to order the regular City Council meeting at 7:00 p.m. Present: Mayor David Grant, Councilmembers Tom Fabel, Brenda Holden, Tena Monson and Emily Rousseau Absent: None Also present: City Administrator Dave Perrault; Public Works Director/City Engineer David Swearingen; Community Development Director Jessica Jagoe; Finance Director Joua Yang; Assistant to the City Administrator/City Clerk Julie Hanson; and City Attorney Amy Schmidt PLEDGE OF ALLEGIANCE 1. APPROVAL OF AGENDA Councilmember Holden requested pulling Item 8B from the Consent Agenda for discussion as Item 9A. Councilmember Monson requested pulling Item 8C from the Consent Agenda for discussion as Item 9B. MOTION: Councilmember Monson moved and Councilmember Holden seconded a motion to approve the meeting agenda as amended. The motion carried (5-0). 2. TCAAP/RICE CREEK COMMONS UPDATE City Administrator Perrault stated The Joint Development Authority has not met since the last Council meeting, neither have either of the committees. We are still waiting on an update from Alatus and their work with a private development partner, we expect a draft of their proposal sometime this week. The energy committee is also in the midst of planning a meeting to with the energy consultant to hear the status of their project. Lastly, the next JDA meeting is tentatively scheduled for July 23rd. ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 2 3. PUBLIC INQUIRIES/INFORMATIONAL Mark Kelliher, 3712 Chatham Court, stated on his last visit to the City Council meeting he mentioned the fact that Councilmember Fabel sent him an email threatening to pursue action against him if he didn't stop asking questions that annoyed him. He explained he was at this meeting to again ask questions. He commented on actions that should have been taken by Councilmember Rousseau but weren't. He reported as the PTRC liaison, Councilmember Rousseau was overseeing the visit by the goats to Chatham trails to mitigate buckthorn growth. He indicated this project was authorized by Council last year and at that time, the Council also authorized the expense of sowing grass seed during the goats' second visit. He commented the rationale was that the goats would trample in the grass seed as they ate and the grasses would mitigate buckthorn resurgence. He reported sowing grass seed was recommended by Great River Greening and the PTRC. He questioned why Councilmember Rousseau did not follow Council directive and plant the grass seed now that the goats are in the City. He noted he posed this question to Councilmember Rousseau in an email and has not received a response. He understood Councilmember Rousseau does not respond to matters when the answer will embarrass her. Therefore, he was unlikely to get Councilmember Rousseau to respond to him directly. Instead, he is calling on Councilmembers Holden, Monson and Mayor Grant to seek a response from Councilmember Rousseau on why she did not follow through with the agreed upon plan. Without the benefit of the grass seed, the $5,000 to $6,000 that was spent for the goats will have no long- term benefits and was money wasted. He understood $5,000 to $6,000 was not a lot of money and for this reason he was not requesting Councilmember Fabel be asked for a response as Councilmember Fabel has demonstrated that spending City funding prudently was not one of his concerns. He indicated there could have been sloppy execution on Councilmember Rousseau's part, but he feared she secretly wanted the project to fail. John Kysylyezyn, Executive Director for Garbage Haulers for Citizen Choice, 30831 Victoria Street, provided the Council with a handout. He explained Mounds View Mayor Zach Lindstrom likes to slander him every month at meetings and on social media posts. He reported as a former elected official and now as a lobbyist, he has met a lot of government officials. He was of the opinion the Mounds View City Council was one of the most ignorant and unprofessional groups he has ever met. He indicated it was a fact Mayor Lindstrom was too lazy to attend a single negotiation session with the trash haulers. He stated it was also a fact Mayor Lindstrom approached two competitive haulers and told them a joint bid would be looked upon favorably by the city, which smacks of government corruption. He indicated the Council now has a copy of Mayor Lindstrom's fake claim that he threatened to bribe a City Council candidate. He reported this made absolutely no sense, because 83% of Mounds View voters stripped the Council of their power to institute organized trash collection. He commented on the interactions he had with newly elected Councilmember Julie Clark and noted the haulers committee could not donate to any council committee. He stated in closing, he was available to discuss government managed trash collection with the Council. Kris Lillemo, 5132 Long Lake Road in Mounds View, explained he attended the joint worksession that was held between the Arden Hills and Mounds View City Council's. He stated he was a huge fan of Mayor Zach Lindstrom. He indicated the residents of Mounds View do not want organized trash collection and have shown this repeatedly. He explained residents want the freedom to choose their own hauler. He cautioned the Arden Hills City Council from moving in this direction because there are residents that will be on both sides of this issue. ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 4. RESPONSE TO PUBLIC INQUIRIES None. 5. PUBLIC PRESENTATIONS None. 6. STAFF COMMENTS A. Transportation Update Public Works Director/City Engineer Swearingen reported there was congestion related to the 2024 PMP project in isolated areas where concrete work was being completed. He encouraged residents traveling through the area to follow the warning signage as posted. Councilmember Holden questioned when the Lindey's parking lot would be completed. Public Works Director/City Engineer Swearingen stated he did not have a schedule for this project, but he anticipated this work would be completed after the roundabout was finished. Councilmember Monson asked what the estimate was for the parking lot. Public Works Director/City Engineer Swearingen explained he was working with the County on the bid because he saw several discrepancies. He was pleased to report the project came in under budget. B. Night to Unite Update Assistant to the City Administrator/City Clerk Hanson stated Night to Unite would be held on Tuesday, August 6. Individuals interested in hosting a Night to Unite event are encouraged to register their gathering by Friday, July 12 in order to ensure a deputy visit. Events may also be visited by fire department personnel as well as City and other community officials. The City has information about Night to Unite, including the link for online registration, available on the City's main webpage under News and Announcements. Registration can be completed online. Residents can find more information about Night to Unite in general on the Ramsey County Sheriff's Office webpage or by visiting ramseycounty.us and typing night to unite in the search field. Residents wishing to donate school supplies can bring items to their local neighborhood event or drop the items off at the Ramsey County Sheriff's Patrol Station located at 1411 Paul Kirkwold Drive between 8 am and 4:30 pm Monday, August 5 through Friday, August 9. Donations can also be dropped off at City Hall during regular business hours. A list of neighborhoods participating in Night to Unite will be sent to the City Council when it becomes available to staff and the list will also be published on the City's website. C. Elections Update Assistant to the City Administrator/City Clerk Hanson reported voting absentee ballot for the August 13 primary election begins on Friday, June 28. She explained residents can contact Ramsey County's election office to request an absentee ballot. She stated beginning Friday, July ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 2 26 ballots can be placed in the voting machine at the Ramsey County Library in Roseville or Shoreview, or at the elections office in St. Paul. She reported residents voting on election day should report to their designated polling place. She indicated the City Council would have two seats on the ballot for the November 5 general election and filing packets could be found online. She indicated the filing period would run from July 30 through August 13. 7. APPROVAL OF MINUTES A. May 28, 2024, City Council Work Session B. May 28, 2024, Regular City Council MOTION: Councilmember Monson moved and Councilmember Holden seconded a motion to approve the May 28, 2024, City Council Work Session minutes as presented and the May 28, 2024, Regular City Council meeting minutes as amended. The motion carried 4-0-1 (Councilmember Rousseau abstained). 8. CONSENT CALENDAR A. Motion to Approve Consent Agenda Item - Claims and Payroll B. Motion To Approve Pefsennel Pokey Amendment Sa�� Feetwe n o mbt rA C. Metion To Approve Resolution 2024 032 Accepting a Donation From The AM Hills Fotmda4io D. Motion To Approve Resolution 2024-033 Regarding a Clean Water Fund Grant With The Met Council E. Motion To Approve Resolution 2024-034 Charitable Gambling License Renewals For Chops, Inc. And Spring Lake Park Lions F. Motion To Approve Ordinance 2024-005 Amending Chapter 9, Building Regulations - Adopting The Minnesota State Building Code In Perpetuity And Authorizing Publication Of Summary Ordinance G. Motion To Approve Resolution 2024-035 For A Variance At 1784 Gramsie Road — Planning Case 24-010 H. Motion To Approve Recruitment For Deputy Clerk I. Motion To Approve Professional Services Agreement Amendment With Bolton & Menk — 2025 Arden Oaks Park And Freeway Park Improvements Project MOTION: Councilmember Holden moved and Councilmember Monson seconded a motion to approve the Consent Calendar as presented and to authorize execution of all necessary documents contained therein. The motion carried (5-0). 9. PULLED CONSENT ITEMS A. Motion To Approve Personnel Policy Amendment — Safety Footwear Reimbursement Councilmember Holden asked if this expense would be part of the employees' salaries. ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 5 City Administrator Perrault reported this reimbursement was for employees that were not part of a bargaining unit. He commented further on the delineation between items that were and were not taxable. MOTION: Councilmember Holden moved and Councilmember Fabel seconded a motion to Approve Personnel Policy Amendment — Safety Footwear Reimbursement. The motion carried (5-0). B. Motion To Approve Resolution 2024-032 Accepting a Donation From The Arden Hills Foundation Councilmember Monson asked who served on the Arden Hills Foundation. Mayor Grant reported the president of the Arden Hills Foundation was himself. He noted Arlene Mitchell, David Mitchell, Greg Rubenstein and Brian Holmes also serve on the foundation. He explained he volunteered his time on the foundation and noted this group was entirely separate from the City of Arden Hills. Councilmember Monson indicated she wanted appropriate thank you notes sent to those that donated. She thanked each of the individuals who made donations to the Arden Hills Foundation. Mayor Grant reported thank you notes were sent from the Arden Hills Foundation to these individuals. He stated thank you notes would also be sent from the City. Councilmember Holden suggested a picture of the bench and a map to where it is located be included in the thank you notes. MOTION: Councilmember Monson moved and Councilmember Holden seconded a motion to adopt Resolution 2024-032, Accepting a Donation From The Arden Hills Foundation. The motion carried (5-0). 10. PUBLIC HEARINGS A. Quarterly Special Assessments for Delinquent Utilities Finance Director Yang stated water customers whose accounts are 90 days past due were informed that the City intends to certify delinquent charges to Ramsey County to be collected with property taxes. These customers have the right to a hearing in front of the City Council to discuss this matter prior to certification. Mayor Grant asked if the Council supported collecting the special assessments two times a year instead of quarterly. Councilmember Holden indicated the City moved to four times a year because of the housing crisis and the fact that the City was missing out on a lot of utility payments. She suggested staff weigh in on this. Mayor Grant explained he could support keeping the same process in place. ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 6 Mayor Grant opened the public hearing at 7:33 p.m. With no one coming forward to speak, Mayor Grant closed the public hearing at 7:34 p.m. B. Planning Case 24-011 Amending Chapter 13, Section 1325.07 Subd. 6.A — Location Of Buildings Housing Farm Animals, Bees Community Development Director Jagoe stated earlier this year, Joe Kimbell, "Applicant," contacted the City to verify if the keeping of bees would be allowed on his property at 3759 New Brighton Road ("Subject Property"). Staff conveyed that, at present, the City Code requires that "Any building in which farm animals are kept shall be located a distance of two hundred (200) feet or more from any lot line. Any open structure in which farm animals are kept shall be a distance of four hundred (400) feet or more from any lot line, except for chicken coops in the R-1, R-2, and R-3 Districts." Farm animals are defined as "Animals traditionally kept or raised on a farm for the purpose of providing food or products for sale or use, such as cattle, horses, goats, sheep, swine, fowl, bees, and animals raised for fur." In review of the Subject Property, city staff determined that the property did not have the lot width required to meet the distance requirements from any lot line for placement of the bee hive(s). Community Development Director Jagoe reported based on that evaluation, the Applicant submitted a land use application for a Zoning Code Amendment to add language to the Zoning Code for residential zoning districts that would exempt the keeping of bees under Section 1325.07, Subd. 6.A — Location of Buildings Housing Farm Animals. The following is the zoning code language proposed by the Applicant for consideration: 1. The number of hives on residential lots is not to exceed: i. 1 acre or larger: 8 ii. 1 acre - 3/4 Acre: 6 iii. 3/4 Acre to 1/2 Acre: 4 iv. 1/2 acre or less: 2 2. The beehive(s) must not be located in the front of a property or a side yard that abuts a street. 3. They may be no closer than twenty-five (25) feet to an occupied building on another lot and/or any public trail or walkway. 4. The hives shall be located at least ten (10) feet from a property line. 5. Any property owner who keeps bees shall provide and maintain a nearby, designated water source. Community Development Director Jagoe explained the Planning Commission reviewed this application at their June 5, 2024 meeting. At that time, they recommended the addition of a sixth condition that would require any property owner who keeps bees to provide notification to adjacent properties. Staff mirrored the language in the draft ordinance similarly to the phrasing for the keeping of chickens. Councilmember Fabel explained he was a fan of bee keeping. He stated he was a strong supporter of this proposal and did not support imposing any other requirements other than those that were recommended by the Planning Commission. Councilmember Holden questioned if the water source was a major issue. ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 7 Community Development Director Jagoe stated this was an important need for the bees and should be a responsibility for the bee keeper to ensure the bees have water. Councilmember Holden inquired what would happen if hives were too close to each other. She supported the City advertising that bee keeping was now allowed, once this ordinance was passed, in order to make the public aware and to possibly reduce the use of pesticides in the community. Mayor Grant opened the public hearing at 7:45 p.m. Joe Kimbell, 3759 New Brighton Road, thanked the Council for considering his request. He believed this would be a fantastic endeavor for the community. He explained he was available to answer questions the Council may have regarding bee keeping. He commented on how vital a water source was for bees. He noted hives could be within two feet of each other and noted only eight hives would be allowed on a lot that was over an acre in size. He discussed how beneficial it was to have two hives on one lot due to bee collapse. He encouraged residents that were interested in bee keeping to take an educational course. Mayor Grant closed the public hearing at 7:49 p.m. 11. NEW BUSINESS A. Resolution 2024-031 Adopting And Confirming Quarterly Special Assessments For Delinquent Utilities Finance Director Yang stated delinquent utility amounts are certified to Ramsey County quarterly. A list of utility accounts with a delinquent balance was compiled and notices dated May 17, 2024 were mailed. These customers were informed of their delinquent status and were asked to make payment of the delinquent balance by June 17, 2024. Utility accounts with an unpaid delinquent balance would be certified to Ramsey County to be added to property taxes payable in 2025. MOTION: Councilmember Monson moved and Councilmember Holden seconded a motion to adopt Resolution 2024-031 — Adopting and Confirming Ouarterly Special Assessments for Delinquent Utilities. The motion carried (5- B. Planning Case 24-011 Amending Chapter 13, Section 1325.07 Subd. 6.A. — Location Of Buildings Housing Farm Animals, Bees • Ordinance 2024-006 Amending Chapter 13, Section 1325.07 Subd. 6.A. — Location of Buildings Housing Farm Animals, Bees • Publication of Summary Ordinance 2024-006 Community Development Director Jagoe stated staff has prepared draft ordinance language with new language added in red font for your review. On May 1, 2024, the City received a land use application from Joe Kimbell "Applicant" to add language to the Zoning Code for residential zoning districts that would exempt the keeping of bees under Section 1325.07, Subd. 6.A — Location of Buildings Housing Farm Animals. Staff reviewed the zoning code language as proposed based on the Applicant's request and the recommendation of the Planning Commission. ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 MOTION: Councilmember Holden moved and Councilmember Fabel seconded a motion to adopt Adoption of Ordinance 2024-006 for Planning Case 24-011 for Zoning Code Amendments to Chapter 13, Section 1325.07 to allow an exception for the keeping of bees/beehives within the R-1, R-2, and R-3 residential districts in City Code Sections 1325.07, Subd. 6.A — Location of Buildings Housing Farm Animals. The motion carried (5- MOTION: Councilmember Holden moved and Councilmember Fabel seconded a motion to approve authorization to publish a Summary Ordinance of 24-006 for Planning Case 24-011. The motion carried (5- C. Resolution 2024-036 — Planning Case 24-012 — Site Plan Review for 4061 Lexington Avenue North, Primrose School Community Development Director Jagoe stated the applicant has submitted a land use application for a Site Plan Review, seeking flexibility on the height, sign area, quantity of signs allowed, and location for the Subject Property. The Subject Property has road frontage along County Road F West and Lexington Avenue. The Primrose School of Arden Hills and Shoreview opened in October of 2019 and is part of a national system of accredited private preschools that provide child care and early education. The Applicant is seeking flexibility to install signage on an existing freestanding structure along Lexington Avenue. The existing freestanding structure does not conform with sign standards and requirements for freestanding signs in Sign District 6 due to height, sign area (i.e. sign cabinet), sign quantity and location. The City is asked to consider the request for a sign standard adjustment through the Site Plan Review process. Community Development Director Jagoe explained the Subject Property was redeveloped by Bremer Bank in 2016 as an approximately 18,000 gross square foot, two-story bank and office building. The site also had a teller drive -up lane and drive -up ATM. Bremer Bank was permitted to retain an existing freestanding pole sign located at the corner of Lexington Avenue and County Road F as part of the 2016 redevelopment approval. In 2018, the City Council approved Planning Case 18-010 — a Site Plan Review for the site to be redeveloped by Primrose School, which included extensive renovations to the interior of the building and the replacement of parking stalls and drive lanes to the west and south sides of the building for the installation of a playground area and parking area modifications to the north side of the building. The changes in parking triggered the Site Plan Review. As part of the 2018 Site Plan Review and approval, the Applicant proposed to retain and reface the existing legal nonconforming freestanding sign. A condition of approval was "The existing pylon sign at the intersection of County Road F and Lexington Avenue may remain in place. The applicant shall work with staff to utilize the sign in conformance with the Sign Code." Per Section 1280.01 — Nonconforming Signs of the City's Sign Code, a legal nonconforming sign may be continued through repair, replacement, restoration, maintenance, or improvement. If the use of the nonconforming sign or sign structure is discontinued for a period of one (1) year, the sign or sign structure shall not be reconstructed or used except in conformity with the provisions of the sign code. Community Development Director Jagoe reported the Bremer Bank signage was removed from the freestanding pole sign between 2018 and 2019 and replaced with a blank neutral -toned panel within the two cabinets that matches the color of the structure. Therefore, discontinuing the use of the nonconforming sign and starting the one (1) year period to retain the nonconforming status. The Applicant notes that the structure has been unused and standing for at least 5 years. The ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 9 Applicant has stated that with the pandemic occurring within 5 months of starting operations, infrastructure projects were put on hold and the signage project was not a priority. With the discontinuance of the nonconforming sign, the freestanding structure cannot be used except in conformity with the sign code provisions. The Applicant may either propose a new sign that conforms with the sign code provisions for Sign District 6 (i.e. reduce height and sign area of cabinet) or apply for a sign standard adjustment through the Site Plan Review process for flexibility as a new freestanding sign. The Applicant submitted several applications for new signage at the Subject Property on May 1, 2024. The sign plans including new wall, window, and freestanding signage. The wall signs were found in compliance with the Sign District 6 requirements and permits were issued. Staff identified that an additional step would be needed for the proposed freestanding sign given the discontinued nonconforming use of the former sign. Community Development Director Jagoe reviewed the site data, reviewed the Plan Evaluation and offered the following Findings of Fact. 1. The Subject Property is located in the I-1 Zoning District and is guided as Light Industrial and Office in the Land Use Plan. 2. The Applicant has submitted an application for Site Plan Review to install signage on an existing freestanding structure for the Subject Property. 3. Sign Standard Adjustments to the requirements and standards for the height, number, type, lighting, area, and/or location of a sign or signs established by this Chapter may be approved with a Site Plan Review or a Planned Unit Development process as described for in Section 1320 and 1355 of the Zoning Code. 4. Flexibility through the Site Plan Review process has been requested for the height, sign area, and sign face quantity for a freestanding sign on the Subject Property. 5. The proposed signage plan does not conflict with the general purpose and intent of the I-1 Zoning District or the Comprehensive Development Plan for the City. 6. The application is not anticipated to create a negative impact on the immediate area or the community as a whole. 7. The proposed plan will not produce any permanent noise, odors, vibration, smoke, dust, air pollution, heat, liquid, or solid waste, and other nuisance characteristics. 8. A public hearing is not required for Site Plan Review. Community Development Director Jagoe explained the Planning Commission reviewed this application at their June 5, 2024, meeting. At that time, they recommended approval of Planning Case 24-012 to install signage on an existing freestanding structure along Lexington Avenue at 4061 Lexington Avenue N with conditions by a 4-1 vote. The Planning Commission suggested that the Applicant incorporate landscaping plans into the sign proposal. The following are motion language options for the City Council to consider. Councilmember Holden asked if there was illumination in this sign. Community Development Director Jagoe reported the sign was internally lit. Councilmember Holden indicated she had some concerns regarding the landscaping. She explained this was a corner that has a great deal of snow storage and salt. She questioned where there was space to put landscaping given all of the easements that were in place around this sign. ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 10 Community Development Director Jagoe explained the Planning Commission recommended the applicant work to create a landscaping plan. She stated she understood there were a number of easements and utilities under this sign. She reiterated that the landscaping was not a condition for approval, but rather was a suggestion from the Planning Commission. MOTION: Councilmember Holden moved and Councilmember Monson seconded a motion to adopt Resolution 2024-036 for Planning Case 24-012 for a Site Plan Review to install signage on an existing freestanding structure along Lexington Avenue at 4061 Lexington Avenue N based on the findings of fact and submitted plans, as amended by the three conditions in the June 24, 2024 report to the City Council. Councilmember Monson explained she would be supporting this request. She commented on the challenges childcare facilities are facing across the country. Mayor Grant indicated he would be supporting this request. He stated he appreciated the case that was made by the applicant. Councilmember Fabel reported the proposed sign does not conflict with the general purpose and intent of the sign ordinance, nor would there be any negative impact on the immediate area. For this reason, he noted he would be supporting the request. The motion carried (5- 12. UNFINISHED BUSINESS None. 13. COUNCIL COMMENTS Councilmember Rousseau explained due to the tornado watch the other week the PTRC meeting was canceled. Councilmember Rousseau asked how much it cost the City to install a park bench. Public Works Director/City Engineer Swearingen estimated it cost the City $1,000 per bench. Councilmember Fabel commented on the Joint Worksession the Council held with the Mounds View City Council. He stated a potential sports facility was discussed along with organized trash collection and joint recreation activities. He indicated he wanted to hear more about the joint recreation activities. Councilmember Holden asked if the Council could receive reports from the recreation department regarding the revenues and expenditures for the programs that are being offered. Councilmember Holden reported there appears to be a mismatch with what is happening with the goats. She did not believe Councilmember Rousseau was against getting rid of the buckthorn, but noted perhaps Director Swearingen did not know who to be in contact with. She questioned who was in charge of this project and asked why the seed was not sown. ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 11 Public Works Director/City Engineer Swearingen stated he reached out to Kerri Seemann who had been overseeing this project. He noted Ms. Seemann had been working with Bob and Steve to coordinate with the goat herding company. He clarified for the record that he was not aware of the finer details of this project. Councilmember Holden requested City staff follow up on this project. City Administrator Perrault indicated Public Works would be keeping a closer eye on this project as it wraps up. He explained a larger discussion could be held the role of volunteers in the future. Councilmember Holden questioned if the seed could still be spread this year. Public Works Director/City Engineer Swearingen stated the benefit of spreading the seed before the goats arrive was to allow their hooves to push the seed into the ground. He indicated seed could still be spread manually. Councilmember Rousseau reported she was not plotting to keep buckthorn. She stated what has been happening was the PTRC member working on this project has received constant communications from one individual and this was helping her to lose interest in this project. She understood the PTRC member reached out recently and provided feedback on the grass seeding. Councilmember Monson stated she would have assumed City staff would manage these projects instead of a volunteer. She explained she supported the City having a parks master plan in place to assist with laying out how the City would address the management of buckthorn. Councilmember Holden indicated she wanted clear procedures in place for future parks projects in order to ensure the proper course of action is followed. Mayor Grant asked why seed was not put down. Councilmember Rousseau stated she was uncertain why seed was not put down. Councilmember Monson commented while it was disappointing seed was not put down, there were other options for the City. Councilmember Monson reported she and the Mayor met with Xcel Energy to discuss the Partners in Energy program. She stated more data would be provided to her and the mayor in the coming weeks. Councilmember Monson discussed the great work being done for the community by Arden Hills Greening. She noted this was a volunteer based resident group. Councilmember Monson explained she would be interested in reopening the discussion on the chicken keeping ordinance. She reported this ordinance was highly restrictive, required neighbor approval and expensive screening. She suggested the Council readdress this ordinance at a future worksession. ARDEN HILLS CITY COUNCIL — JUNE 24, 2024 12 Councilmember Monson indicated she would support the Council receiving a presentation from Twin Cities Gateway. Mayor Grant stated he had spoken to the executive director of the Twin Cities Gateway and he would be willing to come in and provide the City Council with a presentation. Councilmember Monson commented she would also like to receive a presentation from the police and fire departments on an annual basis. Mayor Grant thanked City Attorney Schmidt for her productive tenure with the City and wished her well in the future. Mayor Grant provided the Council with an update from the Twin Cities Gateway Visitor's Bureau. Mayor Grant commented on the joint discussion that was held with the Mounds View City Council regarding joint park and recreation services. Mayor Grant requested further information regarding Arden Hills Greening. Councilmember Monson explained Steve Erler, Pam Erler and Kerri Seemann were volunteers working with Arden Hills Greening. Mayor Grant reported the City's chicken keeping ordinance was modeled after the City of Minneapolis as well as other cities, and he noted the City was not attempting to be restrictive. A n-InITRN MOTION: Councilmember Monson moved and Councilmember Holden seconded a motion to adiourn. The motion carried (5-0). Mayor Grant adjourned the Regular City Council Meeting at 8:40 p.m. Julie Hanson City Clerk David Grant Mayor CONSENT ITEM 8A ,-ARZEN HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Joua Yang, Finance Director Pang Silseth, Accounting Analyst SUBJECT: Claims and Payroll Listing Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Motion to approve, table or deny the following: • Claims and Payroll Listing All items need a simple majority for action unless otherwise noted. Background Payroll is processed biweekly and accounts payable is processed weekly. Budget Impact N/A Attachments 2024 Payroll #15 $113,044.61 Total Payroll $113,044.61 Paid Claims - 06/29/2024-07/12/2024 (Check Nos. 52719-52750 and ACH Checks) $499,850.85 Total Accounts Payable $499,850.85 Total Claims $612,895.46 CITY OF ARDEN HILLS PAYROLL # 15 CHECKS DATED: 07/19/24 Biweekly: 06/29/24 7,933.63 Oasdi 5,902.61 Medicare 1,380.45 3,605.73 1 Premium 2,223.00 al Premium 186.69 Health Care Reimb. 133.33 Dependent Care Reimb. 208.33 'AL FLEXIBLE SPENDING 2,751.35 Health Saving 1,172.03 AL HEALTH SAVINGS 1,172.03 A 5,319.30 A 1,474.50 ral Pension Fund -Union 1,536.00 State Retirement Svstem 1.700.00 ife/Addl/Dep Life 44.29 ife/Addl non -tax 13.30 TD/STD Insurance 0.00 ERA Life Insurance 40.00 JOE 49 Dues (Union) 140.00 Total Employee Deductions Net Payroll 0.00 Direct Deposit 66,127.08 Gross Payroll Tie -Out 99,163.03 Plus City Paid Benefit TOTAL PAYROLL COST 1 113,044.61 Gross Payroll Less Total FSA Less Total H.SA Less Voluntary Ins Net P/R Subject to FICA FICA Oasdi @ 6.20% FICA Medicare @ 1.45% - 07/12/24 EFT 5,79 02.61 EFT 1,380.45 EFT EFT 0.00 A/P Check* 0.00 A/P Check* A/P Check* A/P Check* 0.00 0.00 EFT 0.00 137.66 EFT 460.86 EFT A/P Check* EFT iEFT A/P Check* 0.00 A/P Check* A/P Check* A/P Check* A/P Check* EFT Note: Federal and State Payroll Tax obligations are satisfied by means of utilizing the US Bank Easy Tax Deposit Service. Transfers are typically made up to two days after the payroll date. * A/P Checks can be found on the ACCOUNTS PAYABLE Check Approval report. Checks may be paid this week or the following week. Accounts Payable Checks by Date - Detail by Check Date User: pang.silseth Printed: 7/17/2024 1:53 PM Check No Vendor No Vendor Name Invoice No Description r` ---Aj� EN HiiLLs Check Date Reference Check Amount ACH ACH001 US BANK 06/30/2024 CHRIM11900 MENARDS 3385-supplies 34.66 FRIDJ11900 ULINE *SHIP SUPPLIES -trash picker 110.94 FRIDJ11900 THECO INC Bob Shaft 567.36 FRIDJ11900 THE SAFETY SOURCE LLC-gloves 153.11 FRIDJ11900 AMZN MKTP US*UH37V62Y3-carburetor kit 17.49 GEBAM11900 MENARDS FRIDLEY MN -gate pull 42.69 HANSJ11900 AMZN MKTP US -return -supplies -15.78 HANSJ11900 MCFOA-Membership 50.00 HANSJ11900 JIMMY JOHNS - 1532 - CC Worksession 181.19 HANSJ11900 JIMMY JOHNS - 1532 -CC Worksession 189.58 HANSJ11900 AMZN MKTP US*5569D8BQ3-supplies 22.77 HANSJ11900 MINNESOTAASSOC OF GOVERN-MAGC M 85.00 HANSJ11900 DAVANNIS #10 ARDEN HILL -CC Worksessio: 126.00 JOHNMI1900 THE UPS STORE 2111-Postage 13.72 JOHNMI1900 MN ZOO POS-Friday Field Trip 271.00 JOHNMI1900 BEISSWENGERS HARDWARE -Keys 7.50 JOHNMI1900 TARGET 00006197-supplies 9.29 JOHNMI1900 DICKS SPORTING GOODS-ballhopper 97.52 JOHNMI1900 AMZN MKTP US*NS88IOGR3-storage boxes 173.63 JOHNMI1900 OFFICE DEPOT #375-supplies 66.17 MIKAT11900 APPLE.COM/BILL-Icloud 0.99 MIKAT11900 FLEET FARM 3 1 00-supplies 43.39 MIKAT11900 MENARDS BLAINE MN -supplies 64.79 MIKAT11900 THE HOME DEPOT #2828-Sprayer 171.92 MIKAT11900 FLEET FARM 3 1 00-supplies 182.43 MOONJI1900 AMAZON.COM*SM6EY4A63-clothing allows 134.96 REBATE11900 US BANK REBATE -387.79 SEIFM11900 RUNNINGS OF WILLMAR-ClothingAllowanc 19.95 SWEAD11900 PSN*MINNESOTA RWA MN 133.33 SWEAD11900 PSN*MINNESOTARWA MN 133.33 SWEAD11900 PSN*MINNESOTA RWA MN 133.34 YANGJ11900 AMZN MKTP US*CT8H706K3-supplies 12.98 YANGJ11900 GOVERNMENT FINANCE OFFICE-ACFR 460.00 YANGJ11900 AMZN MKTP US*U29VW44V3-supplies 97.00 Total for this ACH Check for Vendor ACH001: 3,404.46 ACH ACH002 AFLAC 06/30/2024 354476 Insurance Premiums -June 2024 45.52 Total for this ACH Check for Vendor ACH002: 45.52 ACH ACH005 MINNESOTA REVENUE -SALES & USE 06/30/2024 61824 May Sales/Use Tax 169.59 61824 May Sales/Use Tax -0.59 Total for this ACH Check for Vendor ACH005: 169.00 ACH ACH007 QUADIENT FINANCE USA INC 06/30/2024 AP Checks by Date - Detail by Check Date (7/17/2024 1:53 PM) Page 1 Check No Vendor No Vendor Name Check Date Check Amount Invoice No Description Reference 6418.0624 Postage supplies 24.70 6418.0624 Postage 5/21/2024 1,000.00 Total for this ACH Check for Vendor ACH007: 1,024.70 Total for 6/30/2024: 4,643.68 ACH 0382 MISSIONSQUARE #106944 07/05/2024 PR 24-14 PR Batch 00100.07.2024 ICMA Employee Perce PR Batch 00100.07.2024 ICN 399.41 PR 24-14 PR Batch 00100.07.2024 ICMA Employer Perce PR Batch 00100.07.2024 ICN 460.86 Total for this ACH Check for Vendor 0382: 860.27 ACH 0387 MISSIONSQUARE #302482 07/05/2024 PR 24-14 PR Batch 00100.07.2024 ICMA Employee Dedu PR Batch 00100.07.2024 ICN 850.00 PR 24-14 PR Batch 00100.07.2024 ICMA Employee Perce PR Batch 00100.07.2024 ICN 233.71 Total for this ACH Check for Vendor 0387: 1,083.71 ACH 10522 MATTHEW JOHNSON 07/05/2024 070124 Mileage Reimbursement- 61.04 Total for this ACH Check for Vendor 10522: 61.04 ACH 2490 CORE & MAIN LP 07/05/2024 U983683 HYD Mod Kits 24,337.00 Total for this ACH Check for Vendor 2490: 24,337.00 ACH 5180 THE TESSMAN COMPANY LLC 07/05/2024 S397662-IN Tur Proline 484.40 Total for this ACH Check for Vendor 5180: 484.40 ACH 5593 AMERICAN LEGAL PUBLISHING COR: 07/05/2024 34754 Ordinance 2024-004 13.50 Total for this ACH Check for Vendor 5593: 13.50 ACH 5681 CENTURY FENCE COMPANY INC 07/05/2024 248897901 Fence Repair 2,100.00 Total for this ACH Check for Vendor 5681: 2,100.00 ACH 8870 CHET'S SHOES INC 07/05/2024 LLC19018. Boots -Seasonal -TV 125.00 llcl9077a Boots-Seasonal-MW 125.00 Total for this ACH Check for Vendor 8870: 250.00 52719 1053 ALLIED BLACKTOP COMPANY INC 07/05/2024 11543 2024 Seal Coat Project 10,523.15 Total for Check Number 52719: 10,523.15 52720 10572 BONFE 07/05/2024 299048935 Met Councul 1/I Program-1184 Benton Way 2,650.00 Total for Check Number 52720: 2,650.00 52721 6502 BSN SPORTS 07/05/2024 AP Checks by Date - Detail by Check Date (7/17/2024 1:53 PM) Page 2 Check No Vendor No Invoice No Vendor Name Description Check Date Reference Check Amount 925870891 Baseball Base Plates 1,238.88 Total for Check Number 52721: 1,238.88 52722 10573 LIFESAVER FIRE PROTECTION 07/05/2024 20343 City Hall Annual Inspection 328.00 Total for Check Number 52722: 328.00 52723 0335 SCHERER BROS LUMBER CO 07/05/2024 782504 lumber 24.17 Total for Check Number 52723: 24.17 Total for 7/5/2024: 43,954.12 ACH 0242 MET COUNCIL ENVIRON SERVICES-S. 07/12/2024 070224 Q2 2024 SAC -24.85 070224 Q2 2024 SAC 2,485.00 Total for this ACH Check for Vendor 0242: 2,460.15 ACH 0285 XCEL ENERGY 07/12/2024 883685072 05/16/24-06/17/24 46.80 883685072 05/16/24-06/17/24 208.52 883685072 05/16/24-06/17/24 2,434.73 883685072 05/16/24-06/17/24 200.02 883685072 05/16/24-06/17/24 1,613.26 883685072 05/16/24-06/17/24 1,792.77 883685072 05/16/24-06/17/24 1,097.83 Total for this ACH Check for Vendor 0285: 7,393.93 ACH 0320 HEALTH PARTNERS INC 07/12/2024 009595503853 August Insurance 18,984.82 009595503853 August Insurance 1,215.97 Total for this ACH Check for Vendor 0320: 20,200.79 ACH 0327 STAPLES INC 07/12/2024 6005164939 Supplies 29.98 Total for this ACH Check for Vendor 0327: 29.98 ACH 10363 MINUTE MAKER SECRETARIAL 07/12/2024 M1900 6/24 CC Meeting Minutes 463.75 Total for this ACH Check for Vendor 10363: 463.75 ACH 10476 TWIN CITIES COMMERCIAL CLEANEI 07/12/2024 06241235 Janitorial Services -June 1,554.58 07241260 Janitorial Services -July 1,554.58 Total for this ACH Check for Vendor 10476: 3,109.16 ACH 10575 TENAMONSON 07/12/2024 071024 Expense Reimbursement-LMC 670.72 Total for this ACH Check for Vendor 10575: 670.72 ACH 10576 EMILYROUSSEAU 07/12/2024 AP Checks by Date - Detail by Check Date (7/17/2024 1:53 PM) Page 3 Check No Vendor No Vendor Name Check Date Check Amount Invoice No Description Reference 070824 Expense Reimbursement-LMC 612.70 070824 Mileage Reimbursement-LMC 119.93 Total for this ACH Check for Vendor 10576: 732.63 ACH 1125 BOLTON & MENK INC 07/12/2024 0339012 2024 PMP 42,953.50 0339015 Arden Manor Park Improvement 2,332.00 0339016 LS 5 Forcemain Replacement 316.50 Total for this ACH Check for Vendor 1125: 45,602.00 ACH 4447 BRAUN INTERTEC CORPORATION 07/12/2024 B387468 2024 PMP Materials Testing 4,922.00 Total for this ACH Check for Vendor 4447: 4,922.00 ACH 4889 COMMUNITY FOOTWORKS 07/12/2024 07012024 July Foot Care Clinic 325.60 Total for this ACH Check for Vendor 4889: 325.60 ACH 5173 BADGER METER 07/12/2024 80164162 Beacon & LTE Sery Units -June 723.64 Total for this ACH Check for Vendor 5173: 723.64 ACH 7501 KELLY & LEMMONS PA 07/12/2024 63342 June Prosecution 3,956.33 Total for this ACH Check for Vendor 7501: 3,956.33 ACH HOLDB BRENDA HOLDEN 07/12/2024 070824 Mileage Reimbursement-LMC 125.29 Total for this ACH Check for Vendor HOLDB: 125.29 ACH JOHC JOHNSON CONTROLS INC 07/12/2024 1-133546052317 Bosch Panel Upgrade 1,229.50 Total for this ACH Check for Vendor JOHC: 1,229.50 ACH TOII TOKLE INSPECTIONS INC 07/12/2024 070124 June Electrical Inspections 1,094.40 Total for this ACH Check for Vendor TOII: 1,094.40 52724 10574 CAPRA'S UTILITIES INC 07/12/2024 7526 Met Council I/I Program-4248 Hamline Ave 5,000.00 7527 Met Council I/I Program-4250 Hamline Ave 987.50 Total for Check Number 52724: 5,987.50 52725 10483 CENTRAL PENSION FUND 07/12/2024 401333.0624 Apprenticeship -June 384.00 Total for Check Number 52725: 384.00 52726 CPF1 CENTRAL PENSION FUND SOURCE A 07/12/2024 184503.0624 June Pension 3,072.00 Total for Check Number 52726: 3,072.00 AP Checks by Date - Detail by Check Date (7/17/2024 1:53 PM) Page 4 Check No Vendor No Vendor Name Check Date Check Amount Invoice No Description Reference 52727 0317 CITY OF ROSEVILLE PARKS AND REC 07/12/2024 070824 Friday Field Trip -Anoka Water Park 13.00 Total for Check Number 52727: 13.00 52728 SHORE CITY OF SHOREVIEW-PARKS & RECR 07/12/2024 GW7824 Volleyball Camp 543.12 Total for Check Number 52728: 543.12 52729 AR -COLD COLDSTONE SHORELINES 07/12/2024 GE 2023-00950 Escrow Refund GE 2023-00950 1622 Lake Joha 1,200.00 Total for Check Number 52729: 1,200.00 52730 1033 COMCAST 07/12/2024 101030.0724 Service 7/3-8/2 108.35 98681.0724 Service 7/5-8/4 121.52 Total for Check Number 52730: 229.87 52731 AR -DENS BRIAN DENSMORE 07/12/2024 PC 23-017 Escrow Refund PC 23-017 4504 Hamline Ave 1,031.04 Total for Check Number 52731: 1,031.04 52732 AR-HARTI JON & SUSAN HARTMAN 07/12/2024 GE 2023-00885 Escrow Refund GE 2023-00885 3197 Shorewoa 500.00 Total for Check Number 52732: 500.00 52733 0447 I.U.O.E LOCAL 49 BENEFIT FUND-INS1 07/12/2024 13P3.0824 August Insurance 11,800.00 N134.0824 August Insurance 1,682.00 Total for Check Number 52733: 13,482.00 52734 0495 LAKE JOHANNA FIRE DEPARTMENT 1 07/12/2024 926 Cap Equipment Reimburse: Upgrade staff space 9,819.22 929 Cap Equipment Reimburse: Hydro Test SCBA B 1,273.60 Total for Check Number 52734: 11,092.82 52735 10362 MARCO TECHNOLOGIES LLC 07/12/2024 INV12643203 Staples 106.75 INV 12645416 Service 6/25-7/24 and Q2 Usage 546.47 INV 12645416 Service 6/25-7/24 and Q2 Usage 96.44 Total for Check Number 52735: 749.66 52736 10448 MARCO TECHNOLOGIES LLC 07/12/2024 532715091 Copier 7/25-8/25 200.35 532715091 Copier 7/25-8/25 35.37 Total for Check Number 52736: 235.72 52737 10523 METRO-INET 07/12/2024 2035 IT Support -July 9,526.00 Total for Check Number 52737: 9,526.00 52738 10486 MINNESOTA METRO NORTH TOURIST\ 07/12/2024 071024 Quality Inn May 2024 Lodging Tax 2,471.59 AP Checks by Date - Detail by Check Date (7/17/2024 1:53 PM) Page 5 Check No Vendor No Vendor Name Check Date Check Amount Invoice No Description Reference 071024 Springhill Suites May 2024 Lodging Tax 10,284.14 Total for Check Number 52738: 12,755.73 52739 10286 MINNESOTA OCCUPATIONAL HEALTF 07/12/2024 462268 Drug Screen 257.00 Total for Check Number 52739: 257.00 52740 0330 PIONEER PRESS INC 07/12/2024 51503734.2024 Online Subscription- 52 weeks through 7/28/202 55.00 Total for Check Number 52740: 55.00 52741 0811 RAMSEY COUNTY 07/12/2024 EMCOM-011752 Fleet Support -June 24.96 EMCOM-011788 CAD Services -June 781.75 EMCOM-011804 911 Disptach-June 5,084.42 FLEET-000912 May Equipment Parts 1,036.89 FLEET-000912 May Equipment Service 3,053.90 FLEET-000917 Fuel Purchase -June 2,552.02 PRK-002368 Q2 2024 Inspections 4,109.21 PRMG-005453 PW Rental Space -July 1,298.56 PRMG-005453 PW Rental Space -July 5,843.55 PRMG-005453 PW Rental Space -July 2,921.78 PRMG-005453 PW Rental Space -July 2,921.78 Total for Check Number 52741: 29,628.82 52742 0282 REPUBLIC SERVICES #899 07/12/2024 0899-004497034 Recycling -June 9,272.97 0899-004497034 Recycling Revenue Sharing-June -838.85 0899-004502055 PW Waste -June 4,045.52 Total for Check Number 52742: 12,479.64 52743 6225 SAND CREEK EAP LLC 07/12/2024 SDC-IN-100482 EAP Annual Contract 2,472.00 Total for Check Number 52743: 2,472.00 52744 AR-SCHR BRETT & JAMIE SCHREIBER 07/12/2024 GE 2023-00773 Escrow Refund GE 2023-00773 3137 Shoreline 3,675.00 Total for Check Number 52744: 3,675.00 52745 10569 SM HENTGES AND SONS INC 07/12/2024 PW24-0100 PAY2 2024 PMP Payment 2 -12,869.85 PW24-0100 PAY2 2024 PMP Payment 2 257,396.89 Total for Check Number 52745: 244,527.04 52746 UB*00634 JASON SMITH 07/12/2024 071024 Reissue Refund Check 013110-000, 4436 Arder 70.53 Total for Check Number 52746: 70.53 52747 10354 ST. PAUL PIONEER PRESS 07/12/2024 0624572589 PC 24-012 #758 4061 Lexington Rd 46.28 0624572589 PC 24-011 #753 3759 New Brighton Rd 95.16 0624572589 Ordinance 2024-004 53.04 0624572589 PC 24-010 #752 1874 Gramsie Rd 43.88 AP Checks by Date - Detail by Check Date (7/17/2024 1:53 PM) Page 6 Check No Vendor No Vendor Name Check Date Check Amount Invoice No Description Reference 0624572589 Ordinance 2024-005 76.96 0624572589 Delinquent UB 32.24 Total for Check Number 52747: 347.56 52748 5142 STAR TRIBUNE 07/12/2024 12750574-0724 eEdition Digital Access 7/21-10/20 64.77 Total for Check Number 52748: 64.77 52749 10568 VERIZON CONNECT 07/12/2024 623000062515 June Service 333.36 Total for Check Number 52749: 333.36 52750 10554 240705 WE GOAT CHEW LLC Chatham Park Path 07/12/2024 3,500.00 Total for Check Number 52750: 3,500.00 Total for 7/12/2024: 451,253.05 Report Total (60 checks): 499,850.85 AP Checks by Date - Detail by Check Date (7/17/2024 1:53 PM) Page 7 CONSENT ITEM - 8B ,-ARZEN HILLS IUVINLVALeiMEN,In"01I DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Joua Yang, Finance Director SUBJECT: 2024 2nd Quarter Financials Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Motion to approve, table or deny the following: • Quarterly budget to actual fund statements and investment portfolio detail for the City. Background Investments - per the Investment Policy, our Benchmark Rate is the 4M plus Rate. At June 30, 2024 — this rate was 5.234% and our portfolio is averaging 2.97%. Our average rate will begin to increase as lower interest investments mature and we continue to invest in higher interest investments. All of our investments are in government secured or government backed deposits. Utility billing cycles and CIP projects are taken into account when determining how much to invest and for how long. Basis of accounting — during the year, City books are kept on a cash basis which means that only items that are received are booked as revenue and items paid are booked as expenses. Adjustments for accruals, deferrals and other accounting requirements are made at year end. The second quarter financial results are generally as expected across all City funds. Building permit revenues are down from the prior year due to decreased building activity. Liquor sales are also down from the prior year. Departments for the most part are under the 50% expended thus far in the year, with the exception of Fire Protection as the annual contract was fully expended in the first half of the year. General Fund — The main source of revenue for the City is property taxes and these come in twice a year. Expenditures are at 51.7% of budget through the end of the second quarter; however, if the second half Fire contract payment had not been expended in the second quarter, expenditures would be at 44.9% compared to 44.4% last year. Some of the differences are also due to the timing of invoices. Page 1 of 2 Other governmental funds and enterprise funds — Utility revenue for second quarter is booked in July 2024 and annual transfers between funds will be booked later in the year. Investment interest earnings total $282,996.43 at the end of second quarter compared to $221,390.18 at the end of the second quarter in 2023, a 27.8% increase. Market value adjustments for investments total $32,571.09 through the end of the second quarter. At the end of 2023, the City recognized a market value loss of $392,148.12. It is important to note that the City holds its investments to maturity and no principal is ever lost on an investment. Discussion City Staff respectfully request the City Council review the quarterly updates for further discussion. Budget Impact None. Attachments Attachment A: Investment Portfolio Analysis Attachment B: General Fund Revenues and Expenditures Summary Attachment C: Other City Funds Revenues and Expenditures Summary Attachment D: Permit Data Page 2 of 2 CITY OF ARDEN HILLS SCHEDULE OF INVESTMENTS FORTHE MONTH ENDING NNE 30, 2024 Unadjusted Madcet Value Deposire- Eepevdivves- Make,Value Madcet Value Unrealized Lrstlltl- Desenptiov Typn 1/1/2024 Pumhsaes Mamnries T—&s Interest 6/302024 6/30/2024 gain/loss Wells Fargo -Ado Wells Fargo Advisors Money M.&ct � 10,636.59 $ - $ - $ 13,608.06 $ 13,608.06 S 0.00 Wells Fargo -Ado FHIl3 Municipal Sccuntics 227,146,85 - - - 227,146.85 229,062.75 1,91590 —Fargo -Ado PHIB Mwicipal knvririae 427,105.40 —427,105.40 429,369.60 2,261.20 664,888.84 2,971.47 667,860.31 672,039.41 4,179.10 RBC RBC—MoneYMadcet - - (106,670.45) - 106,670.45 _ _ RBC Pms aott Wis Bch Dist Mwicipal Sccuntics 233,411.40 - (235,000.00) - - (1,58&60) - 1,588.60 RBC Amencav Bsoke¢d CD 243,417.30 - (245,000,00) (1,582.70) 1,5U.70 RBC &ate.1 Connecticut Municipal Beca,hies 371,028,75 - (375,000,00) - - (3,97125) - 3,97125 RBC CePiml One Bk U� Bmkered CD 99,008.U0 - (101,146.37) - 1,321.37 1117.00) - 817.00 RBC Bavk Hapolim Bmkered CD 243,253.36 - - - - 243,25336 Yl3,826.76 57340 RBC Sallie Mae Bk �Bmkemd CD 212,459.35 _ 242,459.35 244,480.60 2,021.25 RBC Margan Smnlcy BE NA Bmkcmd CD 147,38550 - - - - 141,385.50 149,446.50 2,061.00 RBC Western Alliavice BKlfi-m"Bmkered CD - 243,000.00 - - - 243,000.00 V2,9M.38 (95.62) RBC E—y BK Nat] Assn Wioe Bmkered CD - 115,000.00 - - - 115,000.00 114,954,64 (-16) RBC B,eftnk USA � Bmkered CD N2,418.93 - 0,192.47) - 1,192.47 242,418.93 N6,096.66 , 3,677.73 RBC State ofMi,—i ippi Mwicipal Secanties 393,532.00 - (5,974.00) - 5,974.00 193,13211 391,992,01 2,46000 RBC New 3ersy&&ov Dev —wMwicipal kcuriries 330,683.50 - - 33"613.50 337,295.00 6,611.50 RBC. FFCB Mwicipal Sccuntics 285,471.00 - - - - HIT71 00 290,181.00 4,71000 RBC PHISMwicipal kcvririee 383,532.00 - - ` - - 383,532.00 387364.00 3,832.00 RBC San Ma,cos 3hx Cons Municipal Secanties 232, 115,00 - - - - 232,115.00 236,180.00 0,065.00 RBC Gla&—, Cvty Dve Nd TX Mwicipal Securities 231,097,11 - 23I,097.50 235,270.00 .4,172.50 RBC Ywaipa VY Calif Mwicipal Secadties 191,294.00 - - - 191,29400 192,736.00 1,44200 RBC New Y.& City NY Trevsit Mwicipal&curries 383392.00 - 4,420.00 383,392.00 3M,500.00 I,108.00 RBC Pads Cmck Co M ct Dist CO Mwicipal Sccuntics 288,666.00 (4,021.50) 4,021.50 288,666.00 289,650.00 984.00 RBC Pa--hFla Rev Mwicipal kcvririee 375,414.00 - 375,414.00 374,10,10 (553.90) RBC FEID Muvicipal Secanties 291,753,00 - - - - 291,113oo 293,874,00 2,121.00 RBC City Narional Bavk Bmkered CD N1,928.44 - 24I,928.44 N1,623.44 (305.00) RBC First Oklahoma Bmkered CD 226,186.62 (491.18) - 491.18 226,18662 230,320.02 4,13340 RBC WEALTH Mwhip. City HD Mwicipal kcuriries - - - - - - RBC C. Mwicipal Sccuntcs 348,383.00 - - 348,383.00 347,476.50 (906.50) RBC WA. Mwicipal kcvririee 269,178.00 - - 2,721.65 269,178.00 269,10.71 762.70 RBC WEALTH Hawaii 91G08ds Municipal Secanties 359,100.00 - - 359,100.00 353,437.00 (5,663.00) RBC FHiB� Mwicipal kcuriries 391316.00 7,000.00 395,316.00 399,169.00 3,852.00 RBC FFCB Mwicipal Secanties 271,365.00 0,725.00) 1,72500 271,36500 271,326.00 (3900) RBC FHIE� Mwicipal kcuriries 294,762.00 - 294,762.W 297,936.00 3,174.00 RBC MHFA Mwicipal Sccuntics 2, 1,096.30 - 211,09630 212,904.10 I,807.80 RBC NeW Yotk, N� Mwicipal kcvririee 357,952.00 - - 317,952.00 111,336.10 384.00 RBC Vista CaliCUni kh Dist Municipal Secanties 269,346,00 - - 269,34600 2"248.00 1,902.00 RBC Sao Fmvciscv C� Mwicipal kcuriries 31" 02.50 2,345.00 3171,902.50 313,411,51 1,512.00 RBC Hk Gmve Village H. M wicipa l Secanties 267,723.00 - 267,72300 267,639.00 (8400) RBC Kane McHenry Cook ffi DeU% Mmioipal k-fi&, 340,I09.00 - 340,109.00 316,518.00 (3,591.00) RBC City ofMilWaukcc W l Municipal Sccuntics 399,420.00 - - 399,420.00 395,564.00 (3,856.00) RBC Cry ofNlm-p.l MN Mwicipal kcvririee 347,882.50 - - - - 347,8U.50 343,504.00 (4,378.50) RBC Washington COOR SD#4S3 Municipal Securities 321,472,70 - (5,40523) - 5,405,23 321,472.70 319,271,75 0200.95) RBC kv Diego CA Comm College Muvicipal kcunries 323,235.50 - � - - 323,235.50 321,829.50 (I,407.00) RBC live Oak Bavking Co Wilmivg,ou Bmkered CD 240,832.80 - (2,322.17) - 2,322,17 210,112,10 241,311,21 (495,51) RBC Cook County B.&h Dist Mwioipal kcudries 137,263.00 -w0.00) - 2,730.00 131,263.00 131,183,10 (1,579.20) RBC Pclicen Rapids MN Municipal Sccuntics 425,834.50 - - - 425,834L50 424,604.60 (1,22990) RBC Shakopee MN W 7 0 Muvicipal kc &, 214,435.00 - � - 214,435.00 215.600.00 I.165.00 RBC City o_IGs TX Municipal Secanties 314,468,00 - - 314,46R 00 319,fi16.00 5,14R.00 RBC FFCB Municipal kcuriries 292,071.0� (5,925. 5,925.00 292,071.00 2:1,822.01 (3.249.00) RBC Pa —MAC Mwicipal Secanties 495,202.50 (10,425,00) 10,425,00 495,202,50 488,690.00 (6,51250) RBC EH' Mwicipal kcm& 474,508. 4,662.00) ,662.01 474.508.35 471,311.55 (3,196.80) RBC Statc ofminncsota M uric ipal Sccuntics 334,261.20 (3,510.00) 3,510.00 334,26110 333,606.00 (65510) RBC City ofDvlaW,MN Muvicipal kevririae 376,796. lw - 376,796.00 373,592.00 (3,204.00) 13,576,161.00 853,202.50 (1,127,687.02) 172,862.02 13,474,538.50 13,502,930.49 28,391.99 PMA 4M General Movey Madce, 3,979,884.32 7,680,922.60 (9,132,898.66) 64,21144 2.592,119,70 2,592,119,70 MA 4MPGenem1 Movey Madret 712,965.40 - 18,986.19 731,851.59 J31,851.59 PMA 4M Payroll Money Market 41.45 787,684.65 (787,739.13) 26.94 1391 13.91 (0.00) —A ARPA Fw& Muvicipal &cvririae 158,286.61 - 4,117.68 162,474.29 162,474.29 MATemt Series (da xxx ys) Municipal Secanties 500,000.00 - (519,750.69) - 19,750.69 - - - MA Tenn kdes(—days) Muvicipalkcudties - 500,000.00 jjw,000.00 &0,000.00 5,351,077.78 8,968,607,25 (10,440388.48) W7,162.94 3,986,459.49 3,986,45949 (0.00) Total weh and invasvnevts $ 19,592,127.62 $ 9,921,809.75 $ (11,568,075.50) $ - $ 282,996.43 $ 19,128,858.30 $ 18,161,429.39 $ 32,571.09 $4,000,000 $3,500,000 $3,000,000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 $500,000 CITY OF ARDEN HILLS SCHEDULE OF INVESTMENTS FOR THE MONTH ENDING JUNE 30, 2024 Maturities Current < 1 year 1-2 2-3 3-4 5+ years years years years ■ Money Market ■ Brokered CD ■ Comml Paper ■ Municipal Securities ■ Checking Maturity Current < 1 year 1-2 years 2-3 years 3-4 years 5+ years Weighted average Rate of return Average Maturity (years) Investment Type Money Market Brokered CD Comml Paper Municipal Securities Checking Unadjusted Market Value Market Value Variance W ,TJL,1Vu.VV W , V, v/.JJ W l,l✓I.JJ 3,126,735.64 3,152,541.54 25,805.90 2,688,993.41 2,708,076.41 19,083.00 2,576,305.70 2,581,556.90 5,251.20 2,615,807.70 2,605,495.25 (10,312.45) 3,628,907.85 3,613,691.74 (15,216.11) $ 18,128,858.30 $ 18,161,429.39 $ 32,571.09 2.97% 6/30/2024 2.22 6/30/2024 Market Value 6/30/2024 $ 3,337,593.26 1,953,990.29 12,869,845.84 $ 18,161,429.39 CITY OF ARDEN HILLS STATEMENT OF REVENUES AND EXPENDITURES GENERAL FUND FOR THE THREE MONTHS ENDED JUNE 30 2024 2023 % of % of Budget YTD Budget Budget YTD Budget REVENUES $ 4,638,460 $ 1,883,744 40.6% Taxes $ 4,078,390 $ 1,693,756 41.5% 552,020 $ 214,172 38.8% Licenses and permits 511,730 $ 259,388 50.7% 175,970 $ 56,825 32.3% Intergovernmental 171,370 $ 53,178 31.0% 489,490 $ 219,042 44.7% Charges for services 525,550 $ 215,392 41.0% 19,250 $ 12,135 63.0% Fines and forfeits 23,190 $ 11,154 48.1% 3,090 $ - 0.0% Special assessments 3,350 $ - 0.0% 50,000 $ 27,718 55.4% Investment earnings 42,500 $ 35,193 82.8% 10,920 $ 31,005 283.9% Miscellaneous 13,340 $ 3,317 24.9% 5,939,200 2,444,640 41.2% TOTAL REVENUES 5,369,420 2,271,378 42.3% EXPENDITURES 88,370 49,452 56.0% Mayor & Council 73,510 44,443 60.5% 499,730 260,843 52.2% Administration 434,230 219,216 50.5% 40,300 18,440 45.8% Elections 33,200 24,197 72.9% 191,810 116,042 60.5% Finance 191,550 120,707 63.0% 114,900 65,066 56.6% TCAAP 90,450 29,787 32.9% 324,940 119,555 36.8% Planning & Zoning 281,080 96,949 34.5% 232,900 106,940 45.9% Government Buildings 223,910 105,430 47.1% 1,585,240 791,344 49.9% Public Safety 1,453,280 725,980 50.0% 70,390 29,331 41.7% Dispatch 68,740 22,912 33.3% 833,930 833,933 100.0% Fire Protection 751,180 375,589 50.0% 9,260 2,707 29.2% Emergency Management 6,830 3,004 44.0% 396,120 162,258 41.0% Protective Inspections 375,770 180,998 48.2% 853,380 256,966 30.1% Street Maintenance 824,080 291,171 35.3% 241,970 77,341 32.0% Recreation 237,770 73,218 30.8% 588,030 277,310 47.2% Park Maintenance 545,590 246,564 45.2% 50,000 - 0.0% Transfers Out 171,140 - 0.0% 6,121,270 3,167,526 51.7% TOTAL EXPENDITURES 5,762,310 2,560,165 44.4% $ (182,070) $ (722,886) 397.0% NET CHANGE IN FUND BALANCE $ (392,890) $ (288,787) 73.5% 50.0% Percentage of Year Complete 50.0% Financial Performance Com Revenues Expenditures Tax revenues are collected twice a year Licenses & Permits. Liquor Sales and Permit Revenues are slightly lower from 2023 Miscellaneous. Fire Hydrant Reimbursement. Salaries & Benefits. Increases across departments due to COLA and insurance increases. Mayor & Council. Full Year cost in 2024 for Northeast Youth & Family Services contract, 2023 billed at 75% TCAAP. Kimley-Horn AUAR and Traffic Updates. Planning & Zoning. Planner position part-time in March 2023, transitioned to full-time in June 2023 Public Safety/Fire Protection. Contract increase in line with budget expectations. Full Year Fire contract paid in 1st Half of 2024 Protective Inspections. Electrical inspections down from 2023, Street Maintenance. Overtime and Salt/Sand savings due to mild winter, Park Maintenance. Timing of expenditures. General Fund Revenues Miscellaneous ` 31 Investment earnings !�g Special assessments 0 Fines and forfeits i 12 Charges for services 219 Intergovernmental 57 Licenses and permits Taxes $ $50 $100 $150 $200 $250 Thousands ■ 2023 ■ 2024 General Fund Expenditures Transfers Out Park Maintenance 277 Recreation i 77 Street Maintenance 7 Protective Inspections 162 Emergency Management 1 3 Fire Protection 834 Dispatch M 29 Public Safety 791 Government Buildings 107 Planning & Zoning 120 TCAAP ` 65 Finance � 116 Elections W 18 Administration 261 Mayor & Council 49 $ $100 $200 $300 $400 $500 $600 $700 $800 $900 Thousands 02023 02024 CITY OF ARDEN HILLS OTHER GOVERNMENTAL FUNDS BUDGET SUMMARY FOR THE THREE MONTHS ENDED JUNE 30 2024 % of Budget YTD Budget 2023 % of Budget YTD Budget CABLE TV 806 806 Beg Fund Balance 56,635 56,635 94,500 22,432 23.7% Revenues 94,500 23,965 25.4% 142,010 68,671 48.4% Expenditures 142,760 56,164 39.3% (46,704) (45,433) End Fund Balance 8,375 24,436 Cable TV. Franchise revenues are receipted quarterly, in the month following the end of the quarter (Apr, Jul, Oct, Jan) EDA GENERAL 713,987 713,987 Beg Fund Balance 662,514 662,514 100,000 26,040 26.0% Revenues 100,000 21,315 21.3% 88,340 39,717 45.0% Expenditures 87,550 40,976 46.8% 725,647 700,311 End Fund Balance 674,964 642,853 EDA. Tax revenues are collected twice a year (Jun, Nov) TIF FUNDS 1,471,705 1,471,705 Beg Fund Balance 1,342,914 1,342,914 - 16,128 N/A Revenues - 11,632 N/A 5,700 78 1.4% Expenditures 5,700 - 0.0% 1,466,005 1,487,755 End Fund Balance 1,337,214 1,354,547 TIF. TIF note for TIF #4 Presbyterian Homes has been paid in full. EQUIP & BUILDING CAPITAL 383,682 383,682 Beg Fund Balance 245,914 245,914 609,000 35,036 5.8% Revenues 390,000 13,682 3.5% 510,150 53,813 10.5% Expenditures 441,520 57,509 13.0% 482,532 364,905 End Fund Balance 194,394 202,087 Equipment & Building. Transfers are normally completed during the 4th quarter. PARK DEVELOPMENT 197,649 197,649 Beg Fund Balance 218,039 218,039 - 13,687 N/A Revenues - 6,991 N/A 32,000 750 2.3% Expenditures - - N/A 165,649 210,586 End Fund Balance 218,039 225,030 PIR FUND 5,605,204 5,605,204 Beg Fund Balance 4,702,027 4,702,027 1,436,190 335,585 23.4% Revenues 2,043,350 373,767 18.3% 1,956,200 1,497,354 76.5% Expenditures 2,195,700 264,889 12.1% 5,085,194 4,443,434 End Fund Balance 4,549,677 4,810,906 PIR. Bethel final reimbursement for pedestrian trail was received in 2023. Timing of expenditures for construction projects - Arden Manor, Floral Park, Perry Park. FIRE EQUIP CAPITAL 367,950 367,950 Beg Fund Balance 264,303 264,303 60,000 17,941 29.9% Revenues 245,000 11,445 4.7% 522,850 264,593 50.6% Expenditures 178,200 4,262 2.4% (94,900) 121,299 End Fund Balance 331,103 271,486 50.0% Percentage of Year Complete 50.0% REVENUES User charges Connection charges Other Interest earnings TOTALREVENUES EXPENSES Personnel expenses Supplies and materials Other services and charges Water purchases Depreciation Capital expenses Debt service TOTAL EXPENSES Bond Proceeds Transfers out EXCESS (DEFICIT) REVENUES OVER EXPENSES CITY OF ARDEN HILLS, MINNESOTA STATEMENT OF REVENUES AND EXPENSES BUDGET AND ACTUAL FOR THE THREE MONTHS ENDED JUNE 30 WATER FUND Percent Received or Expended Actual Actual Variance - Based on Annual Thru Thru Favorable Actuals Thru Budget 06/30/23 06/30/24 (Unfavorable) 06/30/24 $ 3,116,020 $ 569,051 $ 555,991 $ (13,060) 13,750 2,230 2,230 - 546,860 16,145 20,490 4,344 - 24,220 34,876 10,656 3,676,630 611,646 613,587 1,941 433,770 182,708 194,673 (11,965) 54,000 13,851 10,122 3,729 352,730 179,359 142,836 36,522 1,387,000 245,618 265,641 (20,023) 376,640 - - 1,497,100 168 3,380 (3,212) 250,050 223,475 250,461 (26,986) 4,351,290 845,178 867,113 (21,935) 100,000 $ (774,660) $ (233,532) $ (253,527) $ (19,994) 97.7 % 100.0 126.9 144.0 100.3 106.5 73.1 79.6 108.2 N/A 2012.0 102.6 N/A N/A CITY OF ARDEN HILLS, MINNESOTA STATEMENT OF REVENUES AND EXPENSES BUDGET AND ACTUAL FOR THE THREE MONTHS ENDED JUNE 30 SEWER FUND Percent Received or Expended Actual Actual Variance - Based on Annual Thru Thru Favorable Actuals Thru Budget 06/30/23 06/30/24 (Unfavorable) 06/30/24 REVENUES User charges $ 2,537,260 $ 599,128 $ 603,871 $ 4,742 100.8 % Connection charges 8,250 4,140 825 (3,315) 19.9 Other 11,920 1,780 1,791 11 100.6 Interest earnings - 10,562 15,517 4,956 146.9 TOTAL REVENUES 2,557,430 615,610 622,004 6,394 101.0 EXPENSES Personnel expenses 513,890 218,803 226,359 (7,555) 103.5 Supplies and materials 15,500 14,790 11,585 3,205 78.3 Other services and charges 322,220 134,257 132,675 1,582 98.8 Wastewater charges 901,680 422,684 525,982 (103,297) 124.4 Depreciation 221,570 - - N/A Capital expenses 1,424,800 5,311 63,115 (57,804) 1188.4 Debt service 37,050 34,425 37,114 (2,689) 107.8 TOTAL EXPENSES 3,436,710 830,271 996,829 (166,558) 120.1 Bond Proceeds - - - N/A Transfers out 126,000 N/A EXCESS (DEFICIT) REVENUES OVER EXPENSES $ (1,005,280) $ (214,661) $ (374,825) $ (160,165) 174.6 % Sewer Sales Comparison $3.00 0 $2.50 $2.00 $1.50 $1.00 $0.50 Q1 Q2 -2022 702.30 544,045.08 1,092,286.43 2,203,729.07 -2023 1,043.75 599,128.48 1,218,783.66 2,387,424.52 -2024 542.70 603,870.79 CITY OF ARDEN HILLS, MINNESOTA STATEMENT OF REVENUES AND EXPENSES BUDGET AND ACTUAL FOR THE THREE MONTHS ENDED JUNE 30 SURFACE WATER MANAGEMENT FUND Percent Received or Expended Actual Actual Variance - Based on Annual Thru Thru Favorable Actuals Thru Budget 06/30/23 06/30/24 (Unfavorable) 06/30/24 REVENUES User charges $ 987,840 $ 235,488 $ 247,299 $ 11,811 105.0 % Other - 17,414 3 (17,411) 0.0 Interest earnings - 5,607 9,881 4,274 176.2 TOTAL REVENUES 987,840 258,509 257,183 (1,326) 99.5 EXPENSES Personnel expenses 348,800 148,402 163,390 (14,988) 110.1 Supplies and materials 12,750 9,457 4,595 4,862 48.6 Other services and charges 189,130 53,666 67,669 (14,003) 126.1 Depreciation 163,440 - - - N/A Capital expenses 978,000 3,038 - 3,038 0.0 TOTAL EXPENSES 1,692,120 214,564 235,654 (21,091) 109.8 Transfers out 74,000 - - N/A EXCESS (DEFICIT) REVENUES OVER EXPENSES $ (778,280) $ 43,945 $ 21,529 $ (22,417) 49.0 % Surface Water Fees Comparison $1,000 t0 $900 0 0 $800 $700 $600 $500 $400 $300 $200 $100 $ C!1 C!2 275.71 225,409.31 450,429.11 901,529.16 r--2022 2023 808.42 235,488.45 470,666.14 940,980.71 2024 190.62 247,299.25 CITY OF ARDEN HILLS, MINNESOTA PERMIT DATA FOR BUILDING, HVAC AND PLUMBING FROM PERMITWORKS SOFTWARE FOR THE THREE MONTHS ENDED JUNE 30 06/30/23 06/30/24 Building Permit Issued 217 156 Building Permit Fees 114,491 81,859 Building Plan Review Fees 29,900 27,901 TOTAL BUILDING FEES 144,391 109,759 Valuations of Projects 9,884,390 6,950,994 HVAC Permits Issued 123 107 HVAC Permit Fees 35,328 32,292 HVAC Plan Review Fees - 1,167 TOTAL HVAC FEES 35,328 33,460 Valuation of Projects 2,224,108 1,927,329 Plumbing Permits Issued 86 81 Plumbing Permit Fees 11,484 9,675 Plumbing Plan Review Fees - TOTAL PLUMBING FEES 11,484 9,675 Valuation of Projects 697,998 600,630 TOTAL PERMITS ISSUED 426 344 TOTAL PERMIT FEES 191,203 152,894 TOTAL VALUATION OF PROJECTS 12,806,496 9,478,953 CONSENT ITEM -8C 'It ,-AI�EN HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Julie Hanson, Assistant to the City Administrator/City Clerk SUBJECT: Ribfest 2024 — Outdoor Concert License and Miscellaneous Permit Conditional Approval Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Motions to approve, table, or deny the following: • Conditional approval of an outdoor concert license and miscellaneous permit regarding the 2024 Ribfest event to be located at the Redbulls Headquarters on Saturday, September 21 from 1:00 pm to 6:00 pm. Background Kevin Olson of SnowGlobe is once again planning a 2024 Ribfest event to be held at the Redbulls Headquarters on September 21, 2024. As was the case with the inaugural event last year, several entities will be involved in the approval process for various aspects related to this event. Liquor will be offered at the event which will once again be provided by Skinners Pub, a restaurant that holds a State of Minnesota caterer's license and on -sale liquor license, satisfying the State's requirement for serving liquor at an event. The sponsor also plans to hold a raffle, which requires submittal of the State of Minnesota's LG220 gambling application and acknowledgement of such by the City Council. That application is being brought forward to the City Council for consideration under Consent Item 8D at tonight's meeting. Regarding City approvals, a miscellaneous permit for the event itself and an outdoor concert license for live music are required. These items require City Council approval and are attached (see Attachments A and B). A zoning permit for tents is also required but does not require formal Council approval. City staff are working with the Fire Marshal regarding the applicable zoning permit for tents. Page 1 of 2 Staff is requesting Council consideration regarding conditional approval of the City's outdoor concert license and miscellaneous permit. The permits are conditional based on the following: • Ramsey County Sheriff and Public Works approval of security and traffic plans • Lake Johanna Fire Department approval of fire protection and EMS response • Public Health approval of food handling and/or other public health items • Approval by any other required regulated agencies not identified here The sponsors of the event must comply with any requests made of the aforementioned agencies to satisfy permit approvals. As part of this approval, Staff or Council will have the right to revoke the permit should it be deemed the event or its sponsors are not complying, or planning to not comply, with any of the outlined provisions. Budget Impact N/A Attachments Attachment A: Miscellaneous permit application Attachment B: Outdoor Concert license application Page 2 of 2 From: noreplly(a civicplus.com To: Shannon Dietrich; Julie Hanson; Julie Horak; Amy LaMere Subject: Online Form Submittal: Miscellaneous Permit Application Date: Wednesday, July 10, 2024 11:41:18 AM Caution: This email originated outside our organization; please use caution. Miscellaneous Permit Application Applicant Information First Name Last Name Address1 Address2 City State Zip Phone Number Email Address Activity Information Type of Acivity Business Name Activity Address1 Activity Address2 City State Zip Start Date and Time End Date and Time Kevin Olson 23855 Pickett AVE N Field not completed. Scandia MN 55073 6512120573 kevin(a).snowglobepr.com Itinerant Vendors of Products or Services Minnesota Building and Construction Trades Ribfest 4800 Hamline Ave N Field not completed. Arden Hills MN 55073 9/21 /2024 6:00 AM 9/21/2024 6:00 PM Additional Information A community Ribfest, 30 competitors, National Guard labor and community displays, entertainment. NOTE: Insurance document to follow by 21 JUL 24. Approval Process Special Instructions Types of activities that may be included in this permit application are: • 5K Running race through Arden Hills. City requires a copy of the applicant's liability insurance releasing the City from liability (no fee). • Block parties (no fee). • Flea markets and tent/sidewalk sales ($50). • Concession stands. • Circuses and carnivals. • Itinerant vendors of products or services. Upload Liability Field not completed. Insurance Release Make Payment Pay via Credit Card Some permits may require City Council approval. Email not displaying correctly? View it in your browser. Permit #2024 - — — �it . -ARM HELLS — License Fee _ 1245 West t+wy 98 • IWsn Htus, MN 55112 Phone 851".vl ofa • Fax sS1.sJ1.5177 �_utraia�n�lls.txn 2024 outdoor Concert license AMbon Mar• and Social Seany (per Stale StaIM 270C.72, Subd, 3): Kevin Olson, xxx-xx-2172 SnowGlobe Public Relations, LLC on behalf of MN Building 8 Construction Trades Council Yellow Ribbon Committee L=W Phone Munber. 651-212-0573 Loco Fu Nurnow Federal Tar 10 0 (per State Slafute 270C.72, SAbd. 3): 82-3575966 ONuildinga & Construction Trades Council Yellow Ribbon Committee AYE Gtr Sule: ZIP: 353 7th St W #105 St. Paul MN 55102 GorriaC Name: Conbcc Phone NLanber. Fax N w. Kevin Olson 651-212-0573 ir Dau or Event- Esbnured Number of Attendees: Hours of Event: Sept. 21 , 2021Y 500 Floe 1:00 p.m. to 6:00 p.m. M. ,fk'.1+w8shl►TfiLeHB,D.e+kw1� • Certificate of Uablity Insurance of at least S100,000 for Maly niury to any one person, including accidental death, and not less than 3300.000 damage G51 aggregate; property ablity of at least 00,000 for each accident and not less than $100.000 aggregate. -- P • Certifi ato of WaAcefs Compensation to theoc minimum aeptabe !eveis of the State of Minnesota (attached). —� 0 I\ �w • [)tagrzrn of event taytxA including parking area, event seating, booths, stage, etc (attached). CI to At -LAC ilk e c 1 o u e C —I • Written permission of property owner (appricant is property owner). C i N 4 tt A -e c!C Ono Cu - —/0)� Appkaxt: Date: Corot. Devi4opmard Approved: Denied: Date: C"rneroat Inspector Approved: Denied: Date: city c4wa Approved: Denied: Date: Kevin Olson From: Ohrt, Kristin A CPT USARMY NG MNARNG (USA) Sent: Monday, June 3, 2024 2:14 PM To: Kevin Olson Cr Auge, Kristen L LTC USARMY NG MNARNG (USA); Anna Long;jfowler@local563.org Subject: RE: EWG Submission I Yellow Ribbon Ribfest 121 SEP 24 Kevin, I would like to inform you that we have the band coordinated to support, the 341D is providing a couple vehicles, BG Schafer is scheduled to provide remarks and the RRB lis tracking to have a booth at the event as well. Please let me know if there is anything else you need from our end and please keep us informed if anything changes or any updates to the event. Have a great day. Thanks Very Respectfully, Captain Kristin A. Ohrt MN National Guard Public Affairs Community Relations Officer From: Kevin Olson <kevin@snowglobepr.com> Sent: Monday, January 22, 2024 2:06 PM To: NG MN MNARNG List PAO WEB Cc: Auge, Kristen L LTC USARMY NG MNARNG (USA) Anna Long <anna@snowglobepr.com>; jfowler@local563.org Subject: [Non-DoD Source] EWG Submission I Yellow Ribbon Ribfest 1 21 SEP 24 MN National Guard — On behalf of the Minnesota Building & Construction Trades Council Yellow Ribbon Committee, here is our request to directly coordinate with the 34`h DHHB forYellow Ribbon Ribfest at the 34th ID HQ on Saturday, Sept. 21, 2024. Separate requests followfor: • DID Form 2535 (Aviation Flyover Request) • DID Form 2536 (Static Displays/2 LTVs) • DID Form 2536 (Band) and 341h ID Band Request Form • DID Form 2536 (TAG or GO Speaking Request) DID Form 2536 (Color Guard) • DID 2526 (Static Display) • DID 2526 (Recruiting) Thank you for your consideration. Kid 10•x2o' io'x2o j . 10 x2n'� io"x�o' 0l� _ BTCU �McG°uob Rtlt � Up�w �°mp•tn°r 0 O 1 /, C O pottYble Toilets Nandwalh G �TQ� rVE`T Zone p t Shtons st 4 lu J Layout a ,a p � •�nn� amp� Q Q b'].6' Q & 2 d 0., aoratr•s°b*s'' B3 &1j qr t ,. or� t tea:.' Q Q43 n ��7Ca� u5 '1 `'t( Y`I•C' O w' U-0 • i `Y+~ w.n i erg c ll� Beer Tent 20 - L�F t9Ry�w 'rJyy-u�' 3 7 2 41 03 F21 t38 On y9lcty 563`n,ck L_wb s, Q QQ �11 b251• i food prepMeaQ 0 Q []oQ �12 1 o o,.� -•-f 13 27F j U 14 { t• S CONSENT ITEM - 8D 'It EN HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Julie Hanson, Assistant to the City Administrator/City Clerk SUBJECT: Acknowledgment of Minnesota Building and Construction Trades Application to Hold a Raffle at the September 21, 2024 Ribfest Event with No Waiting Period Budgeted Amount: Actual Amount: Funding Source: Council Should Consider Motion(s) to approve, table or deny the following: • Acknowledgment of the LG220 Application from Minnesota Building and Construction Trades for a raffle to be held at the September 21, 2024 Ribfest Event. Background/Discussion Minnesota Building and Construction Trades has submitted a request for authorization to hold a raffle for the purpose of fundraising for the 5016 Building Strong Communities (BSC). Funds raised will be used for future events with service members, veterans, and their families such as unit picnics, departure ceremony support and trade -specific projects such as home repair when service members are deployed. Per Minnesota's Lawful Gambling regulations, formal acknowledgment of the application from the City is required. A requirement of the LG220 Application for Exempt Permit is that the City must formally acknowledge the application with no waiting period, with a 30-day waiting period, or denial thereof. Staff recommends Council approve a motion acknowledging the LG220 Application for Exempt Permit to conduct a raffle with a drawing date of September 21, 2024, with no waiting period. Budget Impact N/A Attachments Attachment A: LG220 application Attachment B: Non-profit letter Page 1 of 1 MINNESQTA LAWFUL GAMBLING LG220 Application for Exempt Permit 4/23 Page 1 of 3 An exempt permit may be issued to a nonprofit Application Fee (non-refundable) on five or fewer days, and organization that: . conducts lawful gambling Applications are processed in the order received. If the application awards less than $5 Ming in prizes during d calendar is postmarked or received 30 days or more before the event, the year• application fee is $IOO; otherwise the fee is f I50. If total raffle prize value for the calendar year will be Due to the high volume of exempt applications, payment of $1,500 or less, contact the Licensing Specialist assigned to additional fees prior to 30 days before your event will not expedite Your county by calling 651-539-1900. service, nor are telephone requests for expedited service accepted. ORGANIZATIO "!N FOR ATI(3N i Organization Previous Gambling Name: Minnesota Buildin and Construction Trades Council Permit Number: X- 93220-18-004 Minnesota Tax ID Federal Employer ID Number, if any' 8565494 Number (FEIN), if any: 41-087069 Mailing Address: 353 West 7th Street Suite 105 City: St. Paul State: MN Zip: 55102 County: Ramsey Name of Chief Executive Officer (CEO): Tom Dicklich CEO Daytime Phone: 651-287-9999 CEO Email: tdicklich@mntrades.org (permit will be emailed to this email address unless otherwise indicated below) Email permit to (if other than the CEO): kevin snow lobe r.com NONPROFIT STATUS Type of Nonprofit Organization (check one): EDf`ratemal 0 Religious Veterans Other Nonprofit Organization Attach a copy of one of the: following showing proof of nonprofit status: (DO NOT attach a sales tax exempt status or federal employer ID number, as they are not proof of nonprofit status.) ❑ A current calendar year Certificate of Good standing Don't have a copy? Obtain this certificate from: MN Secretary of State, Business Services Division Secretary of State website, phone numbers: 60 Empire Drive, Suite 100 www.sos.state_mn.us St_ Paul, MN 55103 651-296-2803, or toll free 1-877-551-6767 ❑ IRS income tax exemption (50I(c)) letter in your organization's name Don't have a copy? To obtain a copy of your federal income tax exempt letter, have an organization officer contact the IRS toll free at 1-877-829-5500. IRS - Affiliate of national, statewide, or international parent nonprofit organization (charter) If your organization falls under a parent organization, attach copies of both of the following: 1. IRS letter showing your parent organization is a nonprofit 501(c) organization with a group ruling; and 2. the charter or fetter from your parent organization recognizing your organization as a subordinate. GAMBLING PREMISES INFORMATION i Name of premises where the gambling event will be conducted (for raffles, list the site where the drawing will take place):. 34th Red Bull „Infantry Division Headquarters Physical Address (do not use P_0. box): 4$LM_HamHne AVE N Check one: M City: Ard,-n Hjjjs _ _-- Zip: 55112„ County: Township: Zip: County: Date(s) of activity (for raffles, indicate the date of the drawing): - Check each type of gambling activity that your organization will conduct: Bingo Paddlewheels =Pull -Tabs =Tipboards (-Rafe Gambling equipment for bingo paper, bingo boards, raffle boards, paddlewheels, pull -tabs, and tipboards must be obtained from a distributor licensed by the Minnesota Gambling Control Board. EXCEPTION: Bingo hard cards and bingo ball selection devices may be borrowed from another organization authorized to conduct bingo. To find a licensed distributor, go to rvrvw,mn.gov/gcb and click on Distributors under the List of Licensees tab, or call 651-539-1900. LG220 Application for Exempt Permit 4/23 Page 2 of 3 LOCAL UNIT OF GOVERNMENT ACKNOWLEDGMENT (required before submitting application to the Minnesota Gambling Control Board) CITY APPROVAL COUNTY APPROVAL for a gambling premises for a gambling premises located within city limits aThe located in a township application is acknowledged with no waiting period. The application is acknowledged with no waiting period. ❑The application is acknowledged with a 30-day waiting ❑The application is acknowledged with a 30-day waiting period, and allows the Board to issue a permit after 30 days period, and allows the Board to issue a permit after (60 days for a 1st Gass city). 30 days. ❑The application is denied. ❑The application is denied. Print City Name: Arden Hills Print County Name: Signature of City Personnel: Signature of County Personnel: Title: Date: Title: Date: TOWNSHIP (if required by the county) On behalf of the township, I acknowledge that the organization is applying for exempted gambling activity within the township limits. (A township has no statutory authority to approve or The City or County must sign before submitting application to the deny an application, per Minn. Statutes, section 349.213.) Gambling Control Board. Print Township Name: Signature of Township Officer: Title: Date: CHIEF EXECUTIVE OFFICER'S SIGNATURE (required) The information provided in this application is complete and accurate to the best of my knowledge. I acknowledge that the financial report will be completed and returned to the Board within 30 days of the event date. Chief Executive Officer's Signature: Date: (Signature must be CEO's signature; designee may not sign) Print Name: Tom Dicklich REQUIREMENTS MAIL APPLICATION AND ATTACHMENTS Complete a separate application for. Mail application with: • all gambling conducted on two or more consecutive days; or a copy of your proof of nonprofit status; and • all gambling conducted on one day. — application fee (non-refundable). If the application is Onlyone application is required if one or more raffle drawings are PP q 9 postmarked or received 30 days or more before the event, conducted on the same day. the application fee is $100; otherwise the fee is $150. Financial report to be completed within 30 days after the Make check payable to State of Minnesota. gambling activity is done: A financial report form will be mailed with your permit. Complete To: Minnesota Gambling Control Board 1711 West County Road B, Suite 300 South and return the financial report form to the Gambling Control Roseville, MN 55113 Board. Questions? Your organization must keep all exempt records and reports for Call the Licensing Section of the Gambling Control Board at 3-1/2 years (Minn. Statutes, section 349.166, subd. 2(f)). 651-539-1900. Data privacy notice: The information requested application. Your organization's name and ment of Public Safety; Attorney General; on this form (and any attachments) will be used address will be public Information when received Commissioners of Administration, Minnesota by the Gambling Control Board (Board) to by the Board. All other information provided will Management & Budget, and Revenue; Legislative determine your organization's qualifications to be private data about your organization until the Auditor, national and International gambling be involved in lawful gambling activities in Board Issues the permit. When the Board issues regulatory agencies; anyone pursuant to court Minnesota. Your organization has the right to the permit, all information provided will become order; other individuals and agencies specifically refuse to supply the information; however, if public. If the Board does not Issue a permit, all authorized by state or federal law to have access your organization refuses to supply this Information provided remains private, with the to the information; individuals and agencies for information, the Board may not be able to exception of your organization's name and which law or legal order authorizes a new use or determine your organization's qualifications and, address which will remain public. Private data sharing of Information after this notice was as a consequence, may refuse to issue a permit. about your organization are available to Board given; and anyone with your written consent. If your organization supplies the information members, Board staff whose work requires requested, the Board will be able to process the access to the information; Minnesota's Depart - This form will be made available in alternative format (i.e. large print, braille) upon request. An equal appommiry employer 4/23 Page 3 of 3 How You May How You May Not Spend Gambling Funds Spend Gambling Funds Allowable expenses - Gambling funds may be spent for allowable expenses, such as: • gambling equipment (pull -tabs, bingo paper, bingo blower, paddlewheel tickets, tipboard games); • advertising; • printing raffle tickets; or • any services or goods that are directly related to the conduct of your gambling. Charitable contributions - Gambling funds may be spent for the following charitable contributions (lawful purpose): • to or by 501(c)(3) organization and 501(c)(4) festival organizations; • relieving the effects of poverty, homelessness, or disability; • problem gambling programs approved by the Minnesota Department of Human Services; • public or private nonprofit school; • scholarships (if a contribution is made to a scholarship fund, it must be made to a nonprofit organization whose primary mission is to award scholarships); • church; • recognition of military service (open to public) or active military personnel in need; • activities and facilities benefiting youth under age 21; • citizen monitoring of surface water quality, with data submitted to Minnesota PCA; • unit of government (NOTE: A direct contribution to a law enforcement or prosecutorial agency is not allowed); • wildlife management projects or activities that benefit the public -at -large, with DNR approval; • grooming and maintaining snowmobile or all -terrain trails that are grant-in-aid trails, or other trails open to public use, with DNR approval; • supplies and materials for DNR training and educational programs; • nutritional programs, food shelves, and congregate dining programs primarily for persons who are 62 or older or disabled; • community arts organizations or programs; • humanitarian service recognizing volunteerism or philanthropy; and • acquisition and repair of real property and capital assets (contact the Gambling Control Board for requirements). 1. Controlled contribution - An organization may not retain any control over any contribution made from gambling funds. The only exception is for expenditures by a 501(c)(3) organization or a 501(c)(4) festival organization to its general fund. 2. Financial gain - A contribution or expenditure may not be made if it results in any monetary, economic, financial, or material benefit to the organization making the contribution or expenditure. 3. Government - An expenditure may not be made for: • influencing the nomination or election of a candidate for public office; • promoting or defeating a ballot question; or • any activity intended to influence an election or a governmental decision - making process. 4. Law enforcement - A direct contribution may not be made to a law enforcement or prosecutorial agency. S. Pension - A contribution may not be made to a government pension or retirement fund, such as a fire relief association. 6. Conflict of interest - A contribution or expenditure may not be made if it is not allowed under the conflict of interest provisions of the Minnesota Nonprofit Corpo-ration Act, Minnesota Statutes, Section 317A.255. 7. Alcohol - An expenditure may not be made for the purchase of any intoxicating liquor, wine, or malt beverages. 8. Fundraising - An expenditure may not be made for fundraising costs, except as allowed for a 501(c)(3) organization or 501(c)(4) festival organization from its general fund. 9. Other organizations - With few excep- tions, gambling funds may not be contrib- uted to other organizations or clubs such as veterans, fraternal, Lions, etc. unless it is a 501(c)(3) organization. 10. Other contributions - A contribution may not be made to a 501(c)(3) organization or another entity with the intent or effect of not complying with lawful purpose restrictions or requirements. Minnesota Gambling Control Board 2023 MINNESOTA GAMBLING CONTROL BOARD BINGO AND RAFFLE -Checklist for Excluded/Exempt Permits The purpose of this form is to help your organization conduct excluded/exempt gambling in compliance with the requirements listed below. Exempt and Excluded activities cannot be conducted in the same calendar year. The five forms of lawful gambling are bingo, paddlewheels, pull -tabs, raffles and tipboards. Detailed information regarding each requirement is available by clicking on the following links [in blue italics]: 1) applicable statutes and rules; 2) the Law/ul Gambling Manual; 3) the online class, "Conduct of Raffles"; and 4) the phone number and email address of your county's Licensing (license, permits and leases) and Compliance (conduct and reporting) Specialists. Check BOX RAFFLES 1. Tickets are printed in accordance with MN Rule 7861.0310. 2. Tickets contain the sequential number of the raffle ticket. Theatre style tickets may be used. (349.173) 3. A list of prizes and a statement of other relevant information is made available to ticket purchasers. (349.173) 4. The organization must pay in full or otherwise become the owner of all prizes prior to the raffle drawing, except for raffles with gross receipts of $60 or less. (7851.0250) S. A merchandise certificate is used when a prize requiring registration or licensure (guns, cars, ATVs, etc.) is offered. (7861.0250) 6. Prizes must not consist of lawful gambling equipment including raffle tickets for another raffle. (7861.0260) 7. The total value of lawful gambling prizes awarded (use fair market value for donated prizes) does not exceed $50,000 in a calendar year. (349.166) 8. Cash must not be substituted for merchandise prizes that have been won. (7851.0260 Subp. 4C(2)) 9. Alcohol is only awarded as a prize to persons who demonstrate that they are 21 years of age or older. (340A.707) 10.Only cash, personal checks, cashiers checks, money orders, travelers' checks, and debit cards may be accepted for the purchase of tickets (NO CREDIT CARDS - NO INTERNET SALES). (349.2127) (7851.0260) 11.The method of winner selection cannot be manipulated or based on the outcome of an event not underthe organization's control. (349-173) 12- Persons are not required to be present at a raffle drawing to be eligible to win. (349.173) (7861.0310) 13. Raffle tickets are not sold to or won by persons under age 18. (349.181) (7861.0310) 14. Purchasers are not required to buy anything other than the ticket. (349.173) (7861.0310) 15. Clear and legible house rules in accordance with MN Rule 7861.0310 are prominently posted at the point of winner selection. 16. An exempt permit financial report (LG220A) must be submitted to the Gambling Control Board within 30 days of the gambling occasion. (349.166) BINGO 1. Clear and legible house rules in accordance with MN Rule 7861.0270 are prominently posted at the point of winner selection. 2_ House rules include the policy on declaring bingo and last number called. (7861.0270 Subp. 2A(1)) 3. House rules include the reasons for potentially cancelling bingo occasions. (7851.0270Subp.2A(1)) 4. All sales must be on a cash basis and take place at the permitted premises during or immediately prior to the bingo occasion. (NO CREDIT CARDS- NO INTERNET SALES) (7861.0270 Subp. SB(1)) S. Bingo paper must not be offered for free or discounted unless the price is reduced with a coupon. (7861.0270 Subp. 5B(7)) 6. Bingo balls must be available for inspection by at least one player before the occasion begins to determine that all are present and in operating condition. (7851.0270Subp. 3A) 7. No reservation of bingo cards or bingo paper for any person (7851.0270Subp. 37 S. Bingo records (including bingo program) must be kept for 3X years. (7861.0270 Subp. 11) BINGO AND RAFFLES 1. Gambling records must be kept for 3%, years. (7861.0310) 2. Gambling funds may only be spent for allowable expenses and lawful purposes. (349.12 Subd. 3a) (349.12 Subd. 25) (mn.gov/gcb/faq-exemptexcluded.htmi) and (mn.gov/gcb/assets/infosheetspendinggamblingfunds.pdf) 7/23 Department of the Treasury Date: Internal Revenue Service 10/03/2022 Tax Exempt and Government Entities IDS P.O. Box 2508 Employer ID number: 88-0687710 Cincinnati, OH 45201 Person to contact: Name: Oleg Berenson 1D number: 17242 Telephone: (877) 829-5500 BUILDING STRONG COMMUNITIES INC Accounting period ending: CIO THOMAS DICKLICH December 31 353 WEST SEVENTH STREET SUITE 105 Public charity status: SAINT PAUL, MN 55102-2314 170(b)(1)(A)(vi) Form 990 f 990-EZ ! 990-N required: Yes Effective date of exemption: December 16, 2021 Contribution deductibility: Yes Addendum applies: No DLN: 26053473008242 Dear Applicant: We're pleased to tell you we determined you're exempt from federal income tax under Internal Revenue Code (IRC) Section 501(c)(3). Donors can deduct contributions they make to you under IRC Section 170. You're also qualified to receive tax deductible bequests, devises, transfers or gifts under Section 2055, 2106, or 2522. This letter could help resolve questions on your exempt status. Please keep it for your records. Organizations exempt under IRC Section 501(c)(3) arc further classified as either public charities or private foundations. We determined you're a public charity under the IRC Section listed at the top of this letter. If we indicated at the top of this letter that you're required to file Form 990/990-EZ/990-N, our records show you're required to file an annual information return (Form 990 or Form 990-EZ) or electronic notice (Form 990-N, the e-Postcard). If you don't file a required return or notice for three consecutive years, your exempt status will be automatically revoked. If we indicated at the top of this letter that an addendum applies, the enclosed addendum is an integral part of this letter. Letter 947 (Rev. 2-2020) Catalog Number 35152P For important information about your responsibilities as a tax-exempt organization, go to www.irs.gov/charities. Enter "4221-PC" in the search bar to view Publication 4221-PC, Compliance Guide for 501(c)(3) Public Charities, which describes your recordkeeping, reporting, and disclosure requirements. We sent a copy of this letter to your representative as indicated in your power of attorney. Sincerely, Stephen A. Martin Director, Exempt Organizations Rulings and Agreements Letter 947 (Rev. 2-2020) Catalog Number 35152P CONSENT ITEM - 8E 'It �-`iIQEN�HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Jessica Jagoe, Community Development Director SUBJECT: Amendment to Urban Requalification Joint Cooperation Agreement Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Requested Action Motions to approve, table, or deny the following: • Amendment to Urban Requalification Joint Cooperation Agreement Background The City of Arden Hills participates in the countywide program to receive and distribute Community Development Block Grant (CDBG) funds from the U.S. Department of Housing and Urban Development (HUD). Ramsey County has been an Entitlement Urban County receiving an annual allocation of CDBG dollars since 1986. The County has used these dollars to undertake housing and community development activities primarily benefiting the low and moderate -income residents of suburban Ramsey County. Sixteen suburban communities have chosen to participate in the agreement process over the past thirty years, ensuring a guaranteed annual allocation for the County and those suburban municipalities that desire to actively participate in the program. The City of Arden Hills has signed cooperative agreements with the County since 1985. CDBG federal regulations require that Ramsey County seek the support and interest of their suburban municipalities every three (3) years as part of a CDBG requalification process. The cooperation agreement with Ramsey County to participate in this program is usually renewed automatically unless a jurisdiction opts out or if an amendment must be approved. As part of this requalification period, the City was notified that there was an amendment required by HUD as part of the cooperation agreement language for Ramsey County. The attached agreement includes one amended and replaced paragraph as part of the approval. Page 1 of 2 Budget Impact N/A Attachments Attachment A: Amendment to Urban Requalification Joint Cooperation Agreement Page 2 of 2 FOURTH AMENDMENT TO JOINT COOPERATION AGREEMENT WHEREAS, the Ramsey County Housing and Redevelopment Authority ("Authority") and ("Municipality"), each a political subdivision of the State of Minnesota, entered into a joint cooperative agreement dated August 19, 1985, as amended May 10, 2006, June 24, 2015, and August 24, 2021 ("Agreement"); and WHEREAS Title I of the Housing and Community Development Act of 1974, 42 U.S.C. § 5301 et seq., as amended, ("CDBG Act") provides for a program of community development block grants; and WHEREAS, computation of a county's population as an Urban County as that term is used in the CDBG Act included the Municipality with which it has entered into the Agreement to undertake or to assist in the undertaking of essential activities pursuant to community development block grants; and WHEREAS, HUD CPD Notice 24-02 requires that an Urban County requalifying in fiscal year (FY) 2024 for the FY 2025-2027 qualification period is required to make any necessary revisions to its cooperation agreements at the time that it requalifies; and WHEREAS, the Authority requalified for the FY 2025-2027 qualification period and therefore amends the Agreement; and WHEREAS, the Mayor of the Municipality, or an authorized signatory, is authorized to execute this amendment to the Agreement on the Municipality's behalf, and WHEREAS, the County Manager is authorized to execute this amendment to the Agreement on the Authority's behalf, and NOW, THEREFORE, the Parties agree to amend the Agreement as follows: 1. Paragraph 4.L.2 of the Agreement is amended and replaced with the following: may participate in a HOME and ESG Programs only through the Authority. If Ramsey County does not receive a HOME formula allocation, the Municipality may not form a HOME consortium with other units of general local government. This does not preclude the Urban County or the Municipality from applying for HOME or ESG funds from the State, if the State allows. 2. Except as modified herein, the terms of the Agreement shall remain in full force and effect. (Signature pages to follow) 2 RAMSEY COUNTY HOUSING AND REDEVELOPMENT AUTHORITY Johanna Berg Ramsey County Manager Dated: APPROVAL RECOMMENDED: Max Holdhusen Deputy Director Housing Development APPROVED AS TO FORM: Assistant Ramsey County Attorney This Document Drafted By: Office of the Ramsey County Attorney 360 Wabasha St. N., Suite 100 Saint Paul, MN 55102 MUNICIPALITY IN Its: Dated: CONSENT ITEM - 8F ,-ARZEN HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Julie Hanson, Assistant to the City Administrator/City Clerk SUBJECT: Accept Resignation of the City Administrator Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Motions to approve, table, or deny the following: • Accept resignation of the City Administrator Background The City Administrator has submitted their resignation with a final date being Friday, August 9, 2024. This will officially accept their resignation. Under a separate item the Council will consider approval of the interim City Administrator. Budget Impact N/A Attachments N/A Page 1 of 1 CONSENT ITEM - 8G ,-ARZEN HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers FROM: Dave Perrault, City Administrator SUBJECT: Appoint Interim City Administrator Budgeted Amount: Actual Amount: Funding Source: N/A TBD Various Funds Council Should Consider Motions to approve, table, or deny the following: • Appointment of Interim City Administrator Background Under a different agenda item the Council will be accepting the City Administrator's resignation with a last day of August 9th. The Personnel Committee recently discussed how to best move forward with the City Administrator vacancy and is recommending Jessica Jagoe, the current Community Development Director, to serve in the interim capacity. This approval would provide for the interim capacity to last until revoked by the City Council or notice by Mrs. Jagoe that she no longer wishes to serve in the interim capacity; it is anticipated it will last until at least the end of the year. This approval will also include out of class pay for Mrs. Jagoe in the amount of an additional fifteen percent of her normal salary. Pending approval, Mrs. Jagoe would begin her interim duties effective at the end of the workday on August 9th following the current City Administrator's departure and would have the duties and authority normally attributed to the City Administrator. Budget Impact The exact budget impact is unknown but will be more than offset by the vacancy of the City Administrator. Attachments N/A Page 1 of 1 CONSENT ITEM - 8H 'It ,- RZEN HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers David Perrault, City Administrator FROM: Lucas J. Miller - Assistant Public Works Director SUBJECT: 2024 CIPP Lining Project — Payment No. I Budgeted Amount: Actual Amount: Funding Source: $415,000 $400,360 Sanitary Sewer Utility Fund, MCES VI Grant Council Should Consider Motions to approve, table, or deny the following: • Payment No. 1 for the 2024 CIPP Lining Project to Hydro-Klean, LLC in the amount of $59,029.20. Background/Discussion On April 8, 2024, the City Council approved Resolution 2024-018 Accepting Bid and Awarding the Construction Contract with Hydro-Klean, LLC for the 2024 CIPP Lining Project in the amount of $505,280. In a previous memo on February 12, 2024, City staff recommended adding an Alternative construction bid to the project. This includes a grouting and sealing process for the private service laterals. It helps to eliminate I/I but also prevents root intrusion from the private service into the main line which makes routine cleaning operations more efficient. This repair method has been completed on previous projects including the 2021 PMP and proposed in the 2024 PMP. The as -bid Alternative cost was three times higher than the engineer's estimate, but the construction contract allows flexibility by the City to reduce the total number of service repairs during construction. Staff plans to limit the number of repairs to only the services with significant need. The anticipated number of repairs is 30, the corresponding value is reflected in the budget table below. For added information, the service lateral repair work is not considered for reimbursement through the MetCouncil Public I/I grant program. City staff recommended Page 1 of 2 adopting Resolution 2024-018 as presented and will modify the repair work during construction as described. Pursuant to Resolution 2024-010 adopted by City Council on February 12, 2024, City staff initiated bid advertisement for the 2024 CIPP Lining project. A total of two bids were received on March 6, 2024, and opened publicly at City Hall. The project is approximately 15% complete at this time. Items completed to this point include pre -televising and pre -cleaning the entirety of the sewer system within the project and also the open trench repair of a failing sewer leg identified within the plan set. Five percent is being withheld from the work completed in accordance with the contract documents. Payment No. 1 is in the amount of $59,029.20. Staff recommends that Council approve Payment No. 1. Budget Impact A summary of the project costs and funding sources to date is provided below: Total As -Bid Costs: Construction (Primary) $ 282,260 Construction (Alternate) $ 56,700 Engineering Services $ 61,400 TOTAL $ 400,360 Total Estimated Funding Sanitary Sewer Utility Fund $ 400,360 TOTAL $ 400,360 The City is participating in the 2023 Metropolitan Council (MCES) Public Inflow and Infiltration Grant program. Roughly 25% of the construction costs from this project will be eligible for reimbursement at the end of the program cycle in 2026. I/I grant eligible funds are 25% of the pipe lining bid item costs which calculates to $70,565. The 2024-2028 CIP Budget includes funding in the amount of $415,000 for the proposed work. Attachments Attachment A - Recommendation Letter from TKDA Attachment B - Pay Request No. 1 Page 2 of 2 3 TKDA July 3, 2024 Sent via email only: LMiller@cityofardenhills.org Lucas Miller Assistant Public Works Director City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112 Re: Arden Oaks Payment Application #1 City Project No. PW-23-0101 TKDA Project No. 20940.000 Hydro Klean has performed the open cut improvement and the cleaning of the sanitary sewer for the 2024 CIPP Lining Project. Attached please find the payment application #1 for the work performed to date. TKDA recommends payment of payment application #1 for the 2024 CIPP Lining Project. If you have any questions or concerns, please contact Larry Poppler with TKDA at 651.292.4457. Sincerely, Larry P. Poppler, PE Group Manager, Roadways and Utilities 444 Cedar Street, Suite 1500, Saint Paul, MN 551011 tkda.com 1651.292.4400 It mla TKD APPLICATION AND CERTIFICATE FOR PAYMENT TO OWNER: City of Arden Hills PROJECT: 2024 CIPP Lining APPLICATION NO.: 1 1245 Hwy 96 PROJECT #: PW-23-0101, 20940.000 APPLICATION DATE: 7/3/2024 Arden Hills, MN 55112 APPLICATION PERIOD TO: 713/2024 FROM CONTRACTOR: Hydro-Klean ENGINEER: Larry Poppler CONTRACT DATE: 4/8/2024 333 NW 49th Place TKDA Des Maine, lA 50313 444 Cedar St St Paul, MN 55101 CONTRACT FOR: Cured -In -Place -Pipe Rehabilitation of Sanitary Sewer Application is made for payment, as shown below, in connection with the contract. 1 ORIGINAL CONTRACT SUM $ 505,280.00 2 NET CHANGE BY CHANGE ORDERS $ - 3 CONTRACT SUM TO DATE (Line 1 + 2) $ 505,280.00 4 TOTAL COMPLETED & STORED TO DATE $ 62,136.00 5 RETAINAGE: a. Completed Work 5% $ 3,106.80 b. Stored Materials 0% $ Total Retainage $ 3,106.80 6 TOTAL EARNED LESS RETAINAGE (Line 4 - 5) $ 59,029.20 7 LESS PREVIOUS CERTIFICATES FOR PAYMENT $ - ((Line 6 (paste # only) from prior Certificate)) It 8 CURRENT PAYMENT DUE (Line 6 - 7) $ 59,029.20 9 BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 - 6) $ 446,250.80 Addition Deduction Total changes approved in previous months by Owner $ - $ - Changes approved this month Change Order 1 Sanitary casting replacement Included in quantities $ - Change Order 2 $ - $ Total additions and subtractions $ $ Net Changes by Change Order $ - undersigned Contractor certifies that to the best of the Contractors knowledge, information and of the Work covered by this Application for Payment has been completed in accordance with Contract Documents, that all amounts have been paid by the Contractor for Work for which rious Certificates for Payment were issued and payments received from the Owner, and that ent payment shown herein is now due. NTRACTOR: Hydro-Klean 333 NW 49th Place Des Moine, IA 50313 (320) 363-8500 Title: Q o 4 r 11,�, J r� day of -jk 0 �"i 2024 ENGINEER'S CERTIFICATE FOR PAYMENT In accordance with the Contract Documents, based on on -site observations and the data comprising this application, the Engineer certifies to the Owner that to the best of the Engineers knowledge, information and belief the Worst has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED 59,029.20 3rd day of July 2024 F:MMN- I11:"l CITY OF ARDEN HILLS PROJECT: 2024 CIPP Lining PROJECT #: PW-23-0101, 20940.000 CONTRACTOR: Hydro-Klean CONTRACT FOR: Cured -In -Place -Pipe Rehabilitation of Sanitary Sewer Date: Payment i 71312024 REM NO. SPEC. NO. ITEM DESCRIPTION UNIT CONTRACT QUANTITY CONTRACT UNIT PRICE CONTRACT AMOUNT QUANTITY AMOUNTEARNED TO DATE TO DATE PERCENT OF CONTRACTAMOUNT QUANTITY AMOUNT BASE BID- 2024 CIPP LINING 1 2021.501 MOBILIZATION LUMP SUM 1 $6,937.12 $6,937.12 0.00 $0.00 0.00% S0.00 2 2101.524 TRAFFIC CONTROL LUMP SUM 1 $1,000.00 $1,000.00 0.00 $0.00 0.00% $0.00 3 2101.524 TEMPORARY CONVEYANCE LUMP SUM 1 $500.00 $500.00 0.00 $0.00 0.00% $0.00 4 2104.502 CLEAN& TELEVISE SANITARY SEWER (PRE -REHABILITATION) LIN FT 5,727 $6.94 $39,745.38 4,400.00 $30536.00 76.83% 4,400.00 $30,536.00 5 2104.503 HEAVY SEWER CLEANING HOUR 25 $400.D0 S10,000.00 4.00 $1,60D.00 16.00% 4.00 $1,600.00 6 2104.503 TRIM PROTRUDING TAP HOUR 5 $400.00 S2,00L00 0.00 $0.00 0.00% $0.00 7 2104.503 CIPP LINING -8"SANITARY SEWER LIN FT 5,727 $32.50 $186,127.50 0.00 $100 0.00% $0.00 6 2104,602 REINSTATE SANITARY SEWER SERVICE EACH 118 $50.00 S5.900.00 0.00 $0.00 0.00% $0.00 9 2104.504 REINSTATE OUTSIDE DROP EACH 1 $50.00 $50.00 0.00 $0.00 0.00% $0.00 10 2104.504 SANITARY SEWER PIPE REPAIR -OPEN -CUT LUMPSUM 1 $3Q000.00 S30,000.00 1.00 $30,000.0D IK00% 1.00 $30,000.00 ALTERNATE 1- LATERAL CONNECTION SEALING 11 Lateral Connection Sealing(5 feet) EACH 118 $1,890.00 $223,020.00 0.00 $0.00 0.00% $0.00 SUBTOTAL SUMMARY $505,280.00 $62,13610 12.30% $62J36.00 BASE BID-2024 CIPP LINING $505,280.0D S62,136.0D 12.30% $62,136.00 TOTAL $505,280.00 $62,136.00 12.30% $62,136.D0 CONSENT ITEM - 8I 'It EN HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: David Swearingen, P.E. Public Works Director / City Engineer SUBJECT: Park Habitat Management - Great River Greening Cooperative Agreements Budgeted Amount: Actual Amount: Funding Source: $0 $38,125 PIR - Parks Council Should Consider Motions to approve, table, or deny the following: • Cooperative Agreement with Great River Greening for Hazelnut Park Understory Restoration and Chatham Park Natural Resource Management Brief Project • Cooperative Agreement with Great River Greening for Floral Park Woodland and Prairie Habitat Restoration Project Background/Discussion At the April 24, 2023 Work Session, this topic was first presented to the City Council. Direction was received to partner with Great River Greening (GRG) to apply for state funding to go towards buckthorn and general habitat management projects at selected parks in Arden Hills. Some of the parks discussed were Hazelnut Park, Chatham Open Space, Floral Park and Perry Park. Since then, Great River Greening has been successful at attaining available funds for the City of Arden Hills through the Outdoor Heritage Fund grant program. On April 16, 2024 the PTRC discussed the project proposals from Great River Greening. The PTRC voted to approve the projects as proposed and move it to the City Council for discussion and further direction. On April 22, 2024 GRG gave a presentation for the full project proposal and background. Council direction was to bring back estimated costs for long-term maintenance needs and exact minimum City cash match requirements and an example of a Natural Resource Management Plan. Page 1 of 2 At the July 8, 2024 Work Session Council gave direction to move forward with the two proposed projects which consists of Hazelnut Park Understory Restoration and Chatham Park Natural Resource Management Brief Project and Floral Park Woodland and Prairie Habitat Restoration Project. The project Cooperative Agreements with GRG are as Attachments A & B. Budget Impact Project Hazelnut Park & Chatham NRMB Floral Park NRMB Chatham Park Totals: Grant amount City funds $ 54,700 $ 12,000 $ 215,100 $ 26,125 N/A N/A Tntal C'ntt 66,700 (Over 3 years) 241,225 (Over 5 years) N/A 269,800 $ 38,125 $ 307,925 Minimum City cash match: Hazelnut Park & Chatham NRMB = $9,000 Floral Park = $20,000 Total minimum cash match = $29,000 GRG notes that volunteer labor cannot be counted towards in -kind City match, in previous discussions it was believed that it could be. Examples of in -kind City labor or contracted services are, but are not limited to, staff time or Arden Hills contracted activities that accomplish a management task within the acres of the project that is required for the completion of the project which otherwise would have been paid for by the grant, such as prairie mowing or woody material removal or disposal. Council should keep in mind when this project was first introduced, it was under the assumption that Public Works would be involved very minimally or not at all during the actual remediation process but would need to plan for the long-term maintenance. If it is Council direction to utilize Public Works as in -kind labor match during remediation, staff will need to schedule this work within the annual Public Works Maintenance Plan and will likely cause more items to be backlogged for repair or maintenance. Long-term maintenance of the 26.03 acres will increase the annual maintenance and operations budget. GRG has provided an estimate for each project site over a span of the first 5 years, the actual amount is not known at this time. If all project sites are approved and completed, the estimated maintenance costs would be $12,830 per year on average or $64,150 total over 5 years. The required activities for long-term maintenance are beyond the Public Works Department's current standard procedures. Public Works staff also believes that in order to adequately manage this program, it should be by a person specialized in natural resources. Arden Hills does not currently have a position specifically for natural resources. Attachments Attachment A: Cooperative Agreement for Chatham Open Space and Hazelnut Park Attachment B: Cooperative Agreement for Floral Park Page 2 of 2 (d\11 :� 1 Rl\ 1.1, '4�� (.-Ik,1.l NIN( GREAT RIVER GREENING COOPERATIVE AGREEMENT THIS AGREEMENT, hereinafter referred to as "Agreement", is made 14t" of June, 2024, by and between the CITY OF ARDEN HILLS, hereinafter referred to as "the City" and GREAT RIVER GREENING, hereinafter referred to as the "GRG". RECITALS GRG is a non-profit 501(c)(3) conservation organization based in St. Paul, Minnesota organized for the purpose of restoring natural areas and open spaces through community engagement; and Under ML 2022, Ch. 77, Art. 1, Sec. 2, Subd. 50), 2022, Metro Big Rivers Phase 12, $8,200,000 is to the commissioner of natural resources for agreements to acquire land in fee and permanent conservation easements and to restore and enhance natural habitat systems associated with the Mississippi, Minnesota, and St. Croix Rivers and their tributaries within the metropolitan area. Great River Greeing has received as an appropriation of $742,000 from the fund to the commissioner of natural resources for an agreement to establish a monitoring and enforcement fund as approved in the accomplishment plan and subject to Minnesota Statutes, section 97A.056, subdivision 17. GRG desires to contribute $54,700 towards the partnership project; and The City desires to contribute $12,000 towards the partnership project; and The City seeks to enter into an agreement with GRG for the purpose of detailing partnership contributions and the provision of Technical Services in support of the Hazelnut Park Understory Restoration and Chatham Park Natural Resource Management Brief Project. With GRG contributing funds from the appropriation to the project, the Landowner is subject to terms as described in Exhibit A. NOW THEREFORE, in consideration of the mutual undertakings and agreement contained within this agreement, the City and GRG hereby agrees as follows: AGREEMENT Compensation and Terms of Payment Compensation Total Project Costs: $66,700 GRG Contributions (OHF): $54,700 City Contributions: $12,000 Funding for this Project is provided by the Outdoor Heritage Fund as recommended by the Lessard -Sams Outdoor Heritage Council (L-SOHC). The City agrees to the conditions as outlined in Exhibit A. Except for the City contribution amount, GRG shall assume fiscal responsibility for all services completed under this Agreement. The parties agree that GRG will complete or arrange for services to be completed under this Agreement. The cost of such services will be funded by joint contributions of the parties. GRG's financial obligation, as set out above, shall be in accordance with the amounts identified above and may be met through actual payment for services to a third party or calculation of the value, on an hourly basis, for "in -kind" services provided. Proposed City Contributions is minimum $9,000 cash match with $3,000 of in -kind City labor or contracted services (non -volunteer). Terms of Payment For the City's contribution, GRG shall submit invoices on an annual basis to the authorized agent of the City for payment of the annual allocation, as shown in the table below. Payments shall be made within thirty (30) days after receipt of invoices by the authorized agent of the City. June 2025 $3,000 June 2026 $3,000 June 2027 $3,000 [.-1I:I I (SIN[. Condition of Pavment All services provided by GRG pursuant to this agreement shall be performed to the satisfaction of the City and its authorized agent, and in accordance with all applicable federal, state and local laws, ordinances, rules and regulations. Payment shall be withheld for work found by the City or its authorized agent to be unsatisfactory, or performed in violation of federal, state and local laws, ordinances, rules or regulations. Scope of Services Hazelnut Park Understory Restoration and Chatham Park Natural Resource Management Brief Project GRG agrees to provide the following list of services for 6.6 acres of woodland enhancement restoration in Hazelnut Park and the writing of a Natural Resources Management Brief for the focus area of Chatham Park: • Planning, implementation, and overseeing of Project activities as agreed on with City staff during the duration of the project. All activities will be approved by the City prior to execution. • Buckthorn and understory woody invasive removal with follow up control activities. • Garlic mustard and invasive forb control and removal. • Native understory shrub and grass / forb species planting and establishment. • Potential volunteer and community engagement activities and education. • Writing of a Natural Resource Management Brief for the priority areas of Chatham Park. • All required state grant administration, yearly auditing, biannual reporting, and required storage of grant related documents for 7 years after completion. The City agrees to provide the following list of services for the Hazelnut and Chatham Park project: • Access to site by GRG or subcontractors. • Coordination and approval of Project activities consistent with the City plans, goals and policies. • Resident notification and signage as appropriate for communication to the public. • In -kind City labor or contracted services as agreed upon to facilitate tasks required for the completion of the project which otherwise would have been paid for by the grant, such as prairie mowing or woody material removal or disposal. The City will submit a memorandum summarizing the value of services provided, no less than 30 days after completion. Effective Date of Contract This agreement shall become effective on the date the agreement has been fully executed by all parties. Term of Contract This agreement shall remain in effect until June 3011, 2027, or until all obligations set forth in this agreement have been satisfactorily fulfilled or unless earlier terminated as provided, whichever occurs first. Notices The City shall appoint an authorized agent for the purpose of administration of this agreement. GRG is notified of the authorized agent of the City as follows: The City of Arden Hills Great River Greening Authorized Contact Authorized Contact David Swearingen Rebecca Tucker Address Address 1245 Hwy 96 W, Arden Hills, MN 55112 251 Starkey Street, Suite 2200 St Paul, MN 55107 Phone Number Phone Number (651) 788-0269 (715) 212-5125 Email Address Email Address dswearingen@cityofardenhills.org rtucker@greatrivergreening.org [ dRf �1 ICI\ 1.1, '4�� (-IR1.1 NINL Partner and State Audit Pursuant to Minn. Stat. Section 16C.05, Subd. 5 (2007), the books, records, documents, and accounting procedures and practices of GRG relative to this agreement shall be subject to examination by the City and the State Auditor. Complete and accurate records of the work performed pursuant to this agreement shall be kept by GRG for a minimum of six (6) years following termination of this agreement for such auditing purposes. The retention period shall be automatically extended during the course of any administrative or judicial action involving the City regarding matters to which the records are relevant. The retention period shall be automatically extended until the administrative or judicial action is finally completed or until the authorized agent of the City notifies GRG in writing that the records need no longer be kept. 8. Indemnity GRG agrees to defend, indemnify, and hold the City, its employees and officials harmless from any claims, demands, actions or causes of action, including reasonable attorney's fees and expenses resulting directly or indirectly from any negligent act or omission on the part of the GRG, or its subcontractors, partners or independent contractors or any of their agents or employees, in the performance of or with relation to any of the work or services to be performed or furnished by the vendor or the subcontractors, partners or independent contractors or any of their agents or employees under the agreement. GRG shall be responsible for the professional quality, technical accuracy, and the coordination of all services furnished by GRG under this agreement. GRG shall, without additional compensation, correct or revise any errors or deficiencies in GRG's final reports and services. 9. Insurance GRG shall not commence work under this agreement until it has obtained, at its own cost and expense, all insurance required herein. All insurance coverage is subject to approval of the City and shall be maintained by GRG until final completion of the work. Workers' Compensation 1) State: Minnesota —Statutory 2) Employer's Liability with minimum limits of: Bodily Injury by Accident: $100,000 each Accident Bodily Injury by Disease: $100,000 each Employee Bodily Injury by Disease: $500,000 policy limit 3) Benefits required by union labor contracts: as applicable In the event GRG is a sole proprietor and has not elected to provide workers' compensation insurance, GRG shall be required to execute and submit an affidavit of sole proprietorship in a form satisfactory to the City before entering into the agreement. Commercial General Liability Including Premises, Operations, Products, Completed Operations, Advertising, and Personal Injury Liability, with the following minimum limits of liability: $2,000,000 Aggregate $2,000,000 Products & Completed Operations Aggregate $1,000,000 Personal Injury & Advertising Injury $1,000,000 Occurrence $ 100,000 Fire Damage Limit $ 5,000 Medical Expense Policy should be written on an occurrence basis and include explosion, collapse and underground. C. Commercial Auto Liability Minimum limits of liability shall be: If split limits: $1,000,000 each person/$1,000,000 each occurrence for Bodily Injury $1,000,000 each occurrence for Property Damage If combined single limit: $1,000,000 per occurrence ICI\ 1.1, '4�� (-Ik,1.1 N I N (-I 10. Subcontracts GRG shall ensure and require that any subcontractor agrees to and complies with all of the terms of this agreement. Any subcontractor of GRG used to perform any portion of this agreement shall report to and bill GRG directly. GRG shall be solely responsible for the breach, performance or nonperformance of any subcontractor. 11. Force Maieure The City and GRG agree that GRG shall not be liable for any delay or inability to perform this agreement, directly or indirectly caused by, or resulting from, strikes, labor troubles, accidents, fire, flood, breakdowns, war, riot, civil commotion, lack of material, delays of transportation, acts of God or other cause beyond reasonable control of GRG and the City. 12. Data Practices GRG, its agents, employees and any subcontractors of GRG, in providing all services hereunder, agree to abide by the provisions of the Minnesota Government Data Practices Act, Minn. Stat. Ch. 13, as amended, and Minn. Rules promulgated pursuant to Ch. 13. GRG understands that it must comply with these provisions as if it were a government entity. GRG agrees to indemnify and hold the City, its officers, department heads and employees harmless from any claims resulting from the GRG's unlawful disclosure, failure to disclose or use of data protected under state and federal laws. 13. Termination This agreement may be terminated by either party, with or without cause upon 30 days written notice to GRG or the Authorized Agent of the City. 14. Independent Contractor It is agreed that nothing contained in this agreement is intended or should be construed as creating the relationship of a partnership, joint venture, or association with the City and GRG. GRG is an independent contractor, and it, its employees, agents, subcontractors, and representatives shall not be considered employees, agents or representatives of the The City (DNR, City, County, Private landowner). Except as otherwise provided herein, GRG shall maintain, in all respects, its present control over the means and personnel by which this agreement is performed. From any amounts due GRG, there shall be no deduction for federal income tax, FICA payments, state income tax, or for any other purposes which are associated with an employer/employee relationship unless otherwise required by law. Payment of federal income tax, FICA payments, state income tax, unemployment compensation taxes, and other payroll deductions and taxes are the sole responsibility of GRG. 15. Notices Any notices to be given under this agreement shall be given by enclosing the same in a sealed envelope, postage prepaid, and depositing the same with the United States Postal Service, addressed to GRG at its address stated herein, and to the authorized agent of the City at the address stated herein. 16. Controlling Law The laws of the State of Minnesota shall govern all questions and interpretations concerning the validity and construction of this agreement, the legal relations between the parties and performance under the agreement. The appropriate venue and jurisdiction for any litigation hereunder will be those courts located within the County or The City, State of Minnesota. Litigation, however, in the federal courts involving the parties will be in the appropriate federal court within the State of Minnesota. If any provision of this contract is held invalid, illegal or unenforceable, the remaining provisions will not be affected. 17. Successors and Assigns The City and GRG, respectively, bind themselves, their partners, successors, assigns, and legal representatives to the other party to this agreement and to the partners, successors, assigns, and legal representatives of such other party with respect to all covenants of this agreement. Neither the City nor GRG shall assign, sublet, or transfer any interest in this agreement without the prior written consent of the other. [ '� I.I A l I\1_I\'I N- - C-1I:I I (SIN[. 18. Equal Employment and Americans with Disabilities In connection with the work under this agreement, GRG agrees to comply with the applicable provisions of state and federal equal employment opportunity and nondiscrimination statutes and regulations. Failure on the part of GRG to conduct its own employment practices in accordance with applicable laws may result in the withholding of all or part of regular payments by the City due under this agreement unless or until GRG complies with the Partner policy, and/or suspension or termination of this agreement. 19. Changes The parties agree that no change or modification to this agreement, or any attachments hereto, shall have any force or effect unless the change is reduced to writing, dated, and made part of this agreement. The execution of the change shall be authorized and signed in the same manner as for this agreement. 20. Severability In the event any provision of this agreement shall be held invalid and unenforceable, the remaining provisions shall be valid and binding upon the parties unless such invalidity or non -enforceability would cause the agreement to fail its purpose. One or more waivers by either party of any provision, term, condition or covenant shall not be construed by the other party as a waiver of a subsequent breach of the same by the other party. 21. Entire Agreement It is understood and agreed that the entire agreement of the parties is contained herein and that this agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the City and GRG relating to the subject matter hereof. IN WITNESS WHEREOF, the parties have caused this agreement to be duly executed intending to be bound thereby. THE CITY OF ARDEN HILLS BY: NAME: TITLE: DATE: GREAT RIVER GREENING: BY: NAME: Kateri Routh TITLE: Executive Director DATE: Grant Manager Initials: 7R7/16/24 Conservation Director Initials: 7,-7116124 Director of Finance Initials: GS 7/17/24 ( \11 :� l Rl\ 1.1, '4�� (-Ik,1.l NINL EXHIBIT A: State of Minnesota — 2022 Outdoor Heritage Fund Metro Big Rivers Habitat — Phase 12 Grantee Landowner Great River Greening The City of Arden Hills Under ML 2022, Ch. 77, Art. 1, Sec. 2, Subd. 50), 2022, Metro Big Rivers Phase 12, $8,200,000 is to the commissioner of natural resources for agreements to acquire land in fee and permanent conservation easements and to restore and enhance natural habitat systems associated with the Mississippi, Minnesota, and St. Croix Rivers and their tributaries within the metropolitan area. Great River Greening has received as an appropriation of $742,000 from the fund to the commissioner of natural resources for an agreement to establish a monitoring and enforcement fund as approved in the accomplishment plan and subject to Minnesota Statutes, section 97A.056, subdivision 17. As a sub -recipient of this funding, the Landowner is subject to the terms below: COMPLIANCE The Landowner acknowledges that these funds are proceeds from the State of Minnesota Outdoor Heritage Fund, which is subject to certain legal restrictions and requirements, including Minnesota Statutes Chapter 116P. The Landowner is responsible for compliance with this and all other relevant state and federal laws and regulations in the fulfillment of the Project. LIABILITY The Landowner must indemnify, save, and hold the State, its agents, and employees harmless from any claims or causes of action, including attorney's fees incurred by the State, arising from the performance of this grant agreement by the Grantee or the Grantee's agents or employees. This clause will not be construed to bar any legal remedies the Grantee may have for the State's failure to fulfill its obligations under this grant agreement. ACCESS AND MONITORING The Landowner agrees to allow the Recipient and the State access at any time to conduct periodic site visits and inspections to ensure work progress in accordance with this grant agreement, including a final inspection upon program completion. At least one monitoring visit per grant period on all state grants of over $50,000 will be conducted and at least annual monitoring visits on grants of over $250,000. Following closure of the program, the State's authorized representatives shall be allowed to conduct post -completion inspections of the site to ensure that the site is being properly operated and maintained and that no conversion of use has occurred. ACKNOWLEDGMENTS AND ENDORSEMENT Acknowledgment. The Landowner must acknowledge financial support from the Outdoor Heritage Fund in program publications, signage and other public communication and outreach related to work completed using the appropriation. Acknowledgment may occur, as appropriate, through use of the fund logo or inclusion of language attributing support from the fund. Endorsement. The Landowner must not claim that the State endorses its products or services. ECOLOGICAL AND RESTORATION PLAN For all restorations, the Grantee in coordination with the Landowner must prepare and retain an ecological restoration and management plan that, to the degree practicable, is consistent with current conservation science and ecological goals for the restoration site. Consideration should be given to soil, geology, topography, and other relevant factors that would provide the best chance for long-term success and durability of the restoration. The plan must include the proposed timetable for implementing the restoration, including, but not limited to, site preparation, establishment of diverse plant species, maintenance, and additional enhancement to establish the restoration; identify long-term maintenance and management needs of the restoration and how the maintenance, management, and enhancement will be financed; and use current conservation science to achieve the best restoration. LONG TERM MANAGEMENT As a partner with Great River Greening, the Landowner commits to maintaining the investment put forward over time. G� I.I A l (-1I:I I NIN( GREAT RIVER GREENING COOPERATIVE AGREEMENT THIS AGREEMENT, hereinafter referred to as "Agreement", is made 161 of June, 2024, by and between the CITY OF ARDEN HILLS, hereinafter referred to as "the City" and GREAT RIVER GREENING, hereinafter referred to as the "GRG". RECITALS GRG is a non-profit 501(c)(3) conservation organization based in St. Paul, Minnesota organized for the purpose of restoring natural areas and open spaces through community engagement; and Under ML 2024, Ch. 106, Art. 1, Sec. 2, Subd. 5(o), Metro Big Rivers Phase 14, $8,123,000 the second year is to the commissioner of natural resources for agreements to acquire land in fee and permanent conservation easements and to restore and enhance natural habitat systems associated with the Mississippi, Minnesota, and St. Croix Rivers and their tributaries within the metropolitan area. GRG desires to contribute $215,100 towards the partnership project; and The City desires to contribute $26,125 towards the partnership project; and The City seeks to enter into an agreement with GRG for the purpose of detailing partnership contributions and the provision of Technical Services in support of the Floral Park Woodland and Prairie Habitat Restoration Project. With GRG contributing funds from the appropriation to the project, the Landowner is subject to terms as described in Exhibit A. NOW THEREFORE, in consideration of the mutual undertakings and agreement contained within this agreement, the City and GRG hereby agrees as follows: AGREEMENT Compensation and Terms of Payment Compensation Total Project Costs: $241,225 GRG Contributions (OHF): $215,100 City Contributions: $26,125 Funding for this Project is provided by the Outdoor Heritage Fund as recommended by the Lessard -Sams Outdoor Heritage Council (L-SOHC). The City agrees to the conditions as outlined in Exhibit A. Except for the City contribution amount, GRG shall assume fiscal responsibility for all services completed under this Agreement. The parties agree that GRG will complete or arrange for services to be completed under this Agreement. The cost of such services will be funded by joint contributions of the parties. GRG's financial obligation, as set out above, shall be in accordance with the amounts identified above and may be met through actual payment for services to a third party or calculation of the value, on an hourly basis, for "in -kind" services provided. Proposed City Contributions is minimum $20,000 cash match with $6,125 of in -kind City labor or contracted services (non -volunteer). Terms of Payment For the City's contribution, GRG shall submit invoices on an annual basis to the authorized agent of the City for payment of the annual allocation, as shown in the table below. Payments shall be made within thirty (30) days after receipt of invoices by the authorized agent of the City. June 2025 $4,000 June 2026 $4,000 June 2027 $4,000 June 2028 $4,000 June 2029 $4,000 [.-1I:I I (SIN[. Condition of Payment All services provided by GRG pursuant to this agreement shall be performed to the satisfaction of the City and its authorized agent, and in accordance with all applicable federal, state and local laws, ordinances, rules and regulations. Payment shall be withheld for work found by the City or its authorized agent to be unsatisfactory, or performed in violation of federal, state and local laws, ordinances, rules or regulations. Scope of Services Floral Park Woodland and Prairie Habitat Restoration Project GRG agrees to provide the following list of services for 13.5 acres of woodland and prairie restoration in Floral Park: • Planning, implementation, and overseeing of Project activities as agreed on with City staff during the duration of the project. All activities will be approved by the City prior to execution. • Writing of a Natural Resource Management Brief for Floral Park. • Buckthorn and understory woody invasive initial removal with follow up control activities. • Garlic mustard and invasive forb control and removal. • Native understory shrub and grass / forb species planting and establishment. • Prairie habitat invasive species control and native species establishment. • Potential volunteer and community engagement activities and education. • All required state grant administration, yearly auditing, biannual reporting, and required storage of grant related documents for 3 years after completion. The City agrees to provide the following list of services for the Floral Park project: • Access to site by GRG or subcontractors. • Coordination and approval of Project activities consistent with the City plans, goals and policies. • Resident notification and signage as appropriate for communication to the public. • In -kind City labor or contracted services as agreed upon to facilitate tasks required for the completion of the project which otherwise would have been paid for by the grant, such as prairie mowing or woody material removal or disposal. The City will submit a memorandum summarizing the value of services provided, no less than 30 days after completion. Effective Date of Contract This agreement shall become effective on the date the agreement has been fully executed by all parties. Term of Contract This agreement shall remain in effect until June 30t'', 2029, or until all obligations set forth in this agreement have been satisfactorily fulfilled or unless earlier terminated as provided, whichever occurs first. Notices The City shall appoint an authorized agent for the purpose of administration of this agreement. GRG is notified of the authorized agent of the City as follows: The City of Arden Hills Great River Greening Authorized Contact Authorized Contact David Swearingen Rebecca Tucker Address Address 1245 Hwy 96 W, Arden Hills, MN 55112 251 Starkey Street, Suite 2200 St Paul, MN 55107 Phone Number Phone Number (651) 788-0269 (715) 212-5125 Email Address Email Address dswearingen@cityofardenhills.org rtucker@greatrivergreening.org [ dRf �1 ICI\ 1.1, '4�� (-IR1.1 NINL Partner and State Audit Pursuant to Minn. Stat. Section 16C.05, Subd. 5 (2007), the books, records, documents, and accounting procedures and practices of GRG relative to this agreement shall be subject to examination by the City and the State Auditor. Complete and accurate records of the work performed pursuant to this agreement shall be kept by GRG for a minimum of six (6) years following termination of this agreement for such auditing purposes. The retention period shall be automatically extended during the course of any administrative or judicial action involving the City regarding matters to which the records are relevant. The retention period shall be automatically extended until the administrative or judicial action is finally completed or until the authorized agent of the City notifies GRG in writing that the records need no longer be kept. 8. Indemnity GRG agrees to defend, indemnify, and hold the City, its employees and officials harmless from any claims, demands, actions or causes of action, including reasonable attorney's fees and expenses resulting directly or indirectly from any negligent act or omission on the part of the GRG, or its subcontractors, partners or independent contractors or any of their agents or employees, in the performance of or with relation to any of the work or services to be performed or furnished by the vendor or the subcontractors, partners or independent contractors or any of their agents or employees under the agreement. GRG shall be responsible for the professional quality, technical accuracy, and the coordination of all services furnished by GRG under this agreement. GRG shall, without additional compensation, correct or revise any errors or deficiencies in GRG's final reports and services. 9. Insurance GRG shall not commence work under this agreement until it has obtained, at its own cost and expense, all insurance required herein. All insurance coverage is subject to approval of the City and shall be maintained by GRG until final completion of the work. Workers' Compensation 1) State: Minnesota —Statutory 2) Employer's Liability with minimum limits of: Bodily Injury by Accident: $100,000 each Accident Bodily Injury by Disease: $100,000 each Employee Bodily Injury by Disease: $500,000 policy limit 3) Benefits required by union labor contracts: as applicable In the event GRG is a sole proprietor and has not elected to provide workers' compensation insurance, GRG shall be required to execute and submit an affidavit of sole proprietorship in a form satisfactory to the City before entering into the agreement. Commercial General Liability Including Premises, Operations, Products, Completed Operations, Advertising, and Personal Injury Liability, with the following minimum limits of liability: $2,000,000 Aggregate $2,000,000 Products & Completed Operations Aggregate $1,000,000 Personal Injury & Advertising Injury $1,000,000 Occurrence $ 100,000 Fire Damage Limit $ 5,000 Medical Expense Policy should be written on an occurrence basis and include explosion, collapse and underground. C. Commercial Auto Liability Minimum limits of liability shall be: If split limits: $1,000,000 each person/$1,000,000 each occurrence for Bodily Injury $1,000,000 each occurrence for Property Damage If combined single limit: $1,000,000 per occurrence ICI\ 1.1, '4�� (-Ik,1.1 N I N (-I 10. Subcontracts GRG shall ensure and require that any subcontractor agrees to and complies with all of the terms of this agreement. Any subcontractor of GRG used to perform any portion of this agreement shall report to and bill GRG directly. GRG shall be solely responsible for the breach, performance or nonperformance of any subcontractor. 11. Force Maieure The City and GRG agree that GRG shall not be liable for any delay or inability to perform this agreement, directly or indirectly caused by, or resulting from, strikes, labor troubles, accidents, fire, flood, breakdowns, war, riot, civil commotion, lack of material, delays of transportation, acts of God or other cause beyond reasonable control of GRG and the City. 12. Data Practices GRG, its agents, employees and any subcontractors of GRG, in providing all services hereunder, agree to abide by the provisions of the Minnesota Government Data Practices Act, Minn. Stat. Ch. 13, as amended, and Minn. Rules promulgated pursuant to Ch. 13. GRG understands that it must comply with these provisions as if it were a government entity. GRG agrees to indemnify and hold the City, its officers, department heads and employees harmless from any claims resulting from the GRG's unlawful disclosure, failure to disclose or use of data protected under state and federal laws. 13. Termination This agreement may be terminated by either party, with or without cause upon 30 days written notice to GRG or the Authorized Agent of the City. 14. Independent Contractor It is agreed that nothing contained in this agreement is intended or should be construed as creating the relationship of a partnership, joint venture, or association with the City and GRG. GRG is an independent contractor, and it, its employees, agents, subcontractors, and representatives shall not be considered employees, agents or representatives of the The City (DNR, City, County, Private landowner). Except as otherwise provided herein, GRG shall maintain, in all respects, its present control over the means and personnel by which this agreement is performed. From any amounts due GRG, there shall be no deduction for federal income tax, FICA payments, state income tax, or for any other purposes which are associated with an employer/employee relationship unless otherwise required by law. Payment of federal income tax, FICA payments, state income tax, unemployment compensation taxes, and other payroll deductions and taxes are the sole responsibility of GRG. 15. Notices Any notices to be given under this agreement shall be given by enclosing the same in a sealed envelope, postage prepaid, and depositing the same with the United States Postal Service, addressed to GRG at its address stated herein, and to the authorized agent of the City at the address stated herein. 16. Controlling Law The laws of the State of Minnesota shall govern all questions and interpretations concerning the validity and construction of this agreement, the legal relations between the parties and performance under the agreement. The appropriate venue and jurisdiction for any litigation hereunder will be those courts located within the County or The City, State of Minnesota. Litigation, however, in the federal courts involving the parties will be in the appropriate federal court within the State of Minnesota. If any provision of this contract is held invalid, illegal or unenforceable, the remaining provisions will not be affected. 17. Successors and Assigns The City and GRG, respectively, bind themselves, their partners, successors, assigns, and legal representatives to the other party to this agreement and to the partners, successors, assigns, and legal representatives of such other party with respect to all covenants of this agreement. Neither the City nor GRG shall assign, sublet, or transfer any interest in this agreement without the prior written consent of the other. [ '� I.I A l I\1_I\'I N- - C-1I:I I (SIN[. 18. Equal Employment and Americans with Disabilities In connection with the work under this agreement, GRG agrees to comply with the applicable provisions of state and federal equal employment opportunity and nondiscrimination statutes and regulations. Failure on the part of GRG to conduct its own employment practices in accordance with applicable laws may result in the withholding of all or part of regular payments by the City due under this agreement unless or until GRG complies with the Partner policy, and/or suspension or termination of this agreement. 19. Changes The parties agree that no change or modification to this agreement, or any attachments hereto, shall have any force or effect unless the change is reduced to writing, dated, and made part of this agreement. The execution of the change shall be authorized and signed in the same manner as for this agreement. 20. Severability In the event any provision of this agreement shall be held invalid and unenforceable, the remaining provisions shall be valid and binding upon the parties unless such invalidity or non -enforceability would cause the agreement to fail its purpose. One or more waivers by either party of any provision, term, condition or covenant shall not be construed by the other party as a waiver of a subsequent breach of the same by the other party. 21. Entire Agreement It is understood and agreed that the entire agreement of the parties is contained herein and that this agreement supersedes all oral agreements and negotiations between the parties relating to the subject matter hereof as well as any previous agreements presently in effect between the City and GRG relating to the subject matter hereof. IN WITNESS WHEREOF, the parties have caused this agreement to be duly executed intending to be bound thereby. THE CITY OF ARDEN HILLS BY: NAME: TITLE: DATE: GREAT RIVER GREENING: BY: NAME: Kateri Routh TITLE: Executive Director DATE: Grant Manager Initials: ?R7/17/24 Conservation Director Initials: 7,R7117124 Director of Finance Initials: GS 7/17/24 [.-1I:f I (SIN[. EXHIBIT A: State of Minnesota — 2024 Outdoor Heritage Fund Metro Big Rivers Habitat — Phase 14 Grantee Landowner Great River Greening The City of Arden Hills Under ML 2024, Ch. 106, Art. 1, Sec. 2, Subd. 5(o), Metro Big Rivers Phase 14, $8,123,000 the second year is to the commissioner of natural resources for agreements to acquire land in fee and permanent conservation easements and to restore and enhance natural habitat systems associated with the Mississippi, Minnesota, and St. Croix Rivers and their tributaries within the metropolitan area. As a sub -recipient of this funding, the Landowner is subject to the terms below: COMPLIANCE The Landowner acknowledges that these funds are proceeds from the State of Minnesota Outdoor Heritage Fund, which is subject to certain legal restrictions and requirements, including Minnesota Statutes Chapter 116P. The Landowner is responsible for compliance with this and all other relevant state and federal laws and regulations in the fulfillment of the Project. LIABILITY The Landowner must indemnify, save, and hold the State, its agents, and employees harmless from any claims or causes of action, including attorney's fees incurred by the State, arising from the performance of this grant agreement by the Grantee or the Grantee's agents or employees. This clause will not be construed to bar any legal remedies the Grantee may have for the State's failure to fulfill its obligations under this grant agreement. ACCESS AND MONITORING The Landowner agrees to allow the Recipient and the State access at any time to conduct periodic site visits and inspections to ensure work progress in accordance with this grant agreement, including a final inspection upon program completion. At least one monitoring visit per grant period on all state grants of over $50,000 will be conducted and at least annual monitoring visits on grants of over $250,000. Following closure of the program, the State's authorized representatives shall be allowed to conduct post -completion inspections of the site to ensure that the site is being properly operated and maintained and that no conversion of use has occurred. ACKNOWLEDGMENTS AND ENDORSEMENT Acknowledgment. The Landowner must acknowledge financial support from the Outdoor Heritage Fund in program publications, signage and other public communication and outreach related to work completed using the appropriation. Acknowledgment may occur, as appropriate, through use of the fund logo or inclusion of language attributing support from the fund. Endorsement. The Landowner must not claim that the State endorses its products or services. ECOLOGICAL AND RESTORATION PLAN For all restorations, the Grantee in coordination with the Landowner must prepare and retain an ecological restoration and management plan that, to the degree practicable, is consistent with current conservation science and ecological goals for the restoration site. Consideration should be given to soil, geology, topography, and other relevant factors that would provide the best chance for long-term success and durability of the restoration. The plan must include the proposed timetable for implementing the restoration, including, but not limited to, site preparation, establishment of diverse plant species, maintenance, and additional enhancement to establish the restoration; identify long-term maintenance and management needs of the restoration and how the maintenance, management, and enhancement will be financed; and use current conservation science to achieve the best restoration. LONG TERM MANAGEMENT As a partner with Great River Greening, the Landowner commits to maintaining the investment put forward over time. CONSENT ITEM - 8.1 ,-ARZEN HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Lucas J. Miller, Assistant Public Works Director David Swearingen, P.E. Public Works Director / City Engineer SUBJECT: 2024 Street Maintenance Program — Large Area Patching project Budgeted Amount: Actual Amount: Funding Source: $220,000 $227,354.09 Street Maintenance Fund Council Should Consider Motions to approve, table, or deny the following: • Quote from GMH Asphalt in the amount of $141,472.00 for the 2024 Street Maintenance Program Large Area Patching project on Grey Fox Rd, Red Fox Rd, and Lake Valentine Rd. Background/Discussion On Tuesday July 16, Public Works staff received 3 quotes to perform the proposed large area patching project for Grey Fox Rd., Red Fox Rd., and Lake Valentine Rd. Attachment A shows a map of the proposed streets. Staff selected these streets for large area patching due to their pavement condition ratings which ranged from 51 to 57, pothole patching has increased significantly, and the City's Pavement Management Program (PMP) project schedule does not address these streets until 2030 and 2032. Due to the high traffic volumes on these streets and the need for a high level of traffic control, staff recommends performing this work by a contractor. The 3 quotes received are as follows: GMH Asphalt $141,472.00 Bituminous Roadways $147,767.59 SM Hentges and Sons $179,650.00 Staff has reviewed the quotes and recommends that the City Council approve the quote as Attachment B with GMH Asphalt in the amount of $141,472.00 and proceed with the work. Page 1 of 2 Budget Impact The 2024 Operating Budget includes funding in the amount of $220,000 for the proposed work under the 2024 Street Maintenance Program and other annual costs related to resurfacing, such as the internally led trail paving project and the JPA Seal Coating program with Coon Rapids. The projected final costs are as follows: • JPA projected final cost is approximately $75,627.09 • PW in-house paving projected final cost is approximately $10,255 • Large Area Patching Project with GMH Asphalt Low -Quote is $141,472.00 Project Area General & Removal Street Improvement Total Cost Costs Costs Lake Valentine Road $ 10,000 $ 37,957 $ 47,957 Red Fox Road 10,000 22,996 32,996 Grey Fox Road 10,000 50,520 60,520 $ 30,000 $ 111,472 $ 141,472 Total projected cost for 2024 Street Maintenance is $227,354.09, which is $7,354.09 over budget. Attachment B includes the GMH Asphalt quoted cost in the amount of $141,472.00. Attachments Attachment A: Large Area Patching map Attachment B: GMH Asphalt Quote Page 2 of 2 v 0 Proposed 2024 Pavement Project 0 I v ° Trail - Reclaim & Pave FT 79 I I � �1 z Street - Large area patching Sun Fish 3 Lake a � Manor 0 Park 4 I y Q I O o v KARTH LAKE DR KEITHSON DR = D 2 F!0 W m ¢ Opp J Z1 :6 HILL L N O ti W -I y NURSERY LEASANT 0 ^' p ARDEN VIEW DR Round NU ERYH/LLCT = RDEN Q� v Lake J Q RDA n I n � I y ve\\\ Royal AMBLE RD m Hills Park MCCLUN EN 0 mingsCTPnrk aG � 3 o x WEDGEW 3 BR RKNOLLC COLLEEN AVE �L EEN AVE F O O O Q yA � g 1 IAN OAKS CT m ti V�(+,FQ 2Z w I (VQ N C a CUMMINGS PARK DR Commun �FtY t Gardens m INDIAN OAKS TRL N O S CIR m R W CIR Floral 2 O KSHORE DR Park EIDE CI 2 �I I I LA JA C VALENTINE, ENT/�yERD CREST RD FLORAL DR W z I I I I I VE I Z I I I I CRYSTAL AVE I I I I I I W W � I idt W Valentin ° Park Park 2 JGRAMSIE RD p GLEN Ir_ o Valentine W W VENUS AVE � I O� Lake o Tony Schmidt o °o I ROAD E2 W Regional Park'-� 0 RFQ FOX RD E2 W zz II 'z v _ z ~ I = a 2 $ ¢ ym Z I I E I Charles Perry Park Arden Oaks s Park OAK AVE Y AVE g I Tony Schmidt l Regional Park � Freew inaey COUNTYROADE z ��NNP 6 Park 0 II L Q C I HUDSON RD co W O 3 BL y a 'OaPNNA Q Z J I OR COUNTYROADE gROENj°C Q��C4 HARRIETAVE ra vZ y h S��V V 17� IF] 2024 Public Works Paving Project -ADEN HILLS � 0 1,600 Feet 2024 Stopgap Project -LARGE AREA PATCHING AND RELATED STRIPING Arden Hills, Minnesota Project Number PW-24-0108 Item No. I Item Unit I Unit Price Est. Quantity I Total Price Lake Valentine Road from Janet Ct to Crystal Ave and trail portion from Janet Ct to High School Completion for this segment by Friday, 8/23/24) (Final GENERAL AND REMOVAL 2021.501 MOBILIZATION LS $6500.00 1 $6500.00 2563.601 TRAFFIC CONTROL (ITEM TO INCLUDE ALL FLAGGERS AND SIGNAGE NECESSARY TO WORK UNDER TRAFFIC WITH LANE CLOSURES) LS $ 3500.00 1 $ 3500.00 TOTAL - GENERAL AND REMOVALS $10,000.00 STREET IMPROVEMENTS 2123.61 STREET SWEEPER (WITH PICKUP BROOM) HOUR $175.00 3 $525.00 2232.501 MILL BITUMINOUS SURFACE (1.25") SQ YD $2.90 2,950 $8555.00 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALS $.01 150 $1.50 2360.501 WEARING COURSE MIXTURE - PER STREET PLATE TON $120.00 200 $ 24000.00 2360.501 IWEARING COURSE MIXTURE - PER TRAIL PLATE I TON 1$120.00 1 30 $3600.00 2582.502 4" SINGLE YELLOW - LATEX PAINT I LIN FT $0.85 11,500 $1275.00 TOTAL - STREET IMPROVEMENTS $37956.50 TOTAL - GENERAL AND REMOVALS TOTAL - STREET IMPROVEMENTS LAKE VALENTINE RD AND TRAIL SEGMENT TOTAL $ 10000.00 $ 37956.50 $ 47956.50 Item No. I Item I Unit I Unit Price Est. Quantity Total Price Red Fox Road from west of Dunlap to west of Lexington Completion for this segment bV Friday, 10118124) Final GENERAL AND REMOVAL 2021.501 MOBILIZATION LS $ 1 $6500.00 2563.601 TRAFFIC CONTROL (ITEM TO INCLUDE ALL FLAGGERS AND SIGNAGE NECESSARY TO WORK UNDER TRAFFIC WITH LANE CLOSURES) LS $ 1 $ 3500.00 TOTAL - GENERAL AND REMOVALS $10000.00 STREET IMPROVEMENTS 2123.61 STREET SWEEPER (WITH PICKUP BROOM) HOUR $175.00 3 $525.00 2232.501 MILL BITUMINOUS SURFACE (1.25") SQ YD $2.90 1,750 $5075.00 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALS $.01 100 $1.00 2360.501 WEARING COURSE MIXTURE - PER STREET PLATE TON $112.00 150 $16800.00 2582.502 4" DOUBLE YELLOW - LATEX PAINT I LIN FT $1.70 350 $595.00 TOTAL - STREET IMPROVEMENTS $22996.00 TOTAL - GENERAL AND REMOVALS TOTAL - STREET IMPROVEMENTS RED FOX RD SEGMENT TOTAL $10,000.00 $22996.00 $ 32996.00 Item No. I Item I Unit I Unit Price Est. Quantity Total Price Grey Fox Road from Highway 51 to west of Lexington Completion for this segment by Friday, 10/18/24) Final GENERAL AND REMOVAL 2021.501 MOBILIZATION LS $6500.00 1 $6500.00 2563.601 TRAFFIC CONTROL (ITEM TO INCLUDE ALL FLAGGERS AND SIGNAGE NECESSARY TO WORK UNDER TRAFFIC WITH LANE CLOSURES) LS $ 3500.00 1 $ 3500.00 TOTAL - GENERAL AND REMOVALS $10000.00 STREET IMPROVEMENTS 2123.61 STREET SWEEPER (WITH PICKUP BROOM) HOUR $175.00 3 $525.00 2232.501 MILL BITUMINOUS SURFACE (1.25") SQ YD $12.70 4,075 $11002.50 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALS $.01 200 $2.00 2360.501 WEARING COURSE MIXTURE - PER STREET PLATE TON $115.00 325 $ 37375.00 2582.502 4" DOUBLE YELLOW - LATEX PAINT I LIN FT $1.70 950 $1615.00 TOTAL - STREET IMPROVEMENTS $50519.50 TOTAL - GENERAL AND REMOVALS TOTAL - STREET IMPROVEMENTS GREY FOX RD SEGMENT TOTAL $ 10000.00 $ 50519.50 $ 60519.50 Page 1 of 1 Page 1 of 1 CONSENT ITEM – 8K MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers FROM: Julie Hanson, Assistant to the City Administrator/City Clerk SUBJECT: Professional Services Agreement with Dave Perrault Budgeted Amount: Actual Amount: Funding Source: N/A TBD Various Funds Council Should Consider Motions to approve, table, or deny the following: • Professional Services Agreement with Dave Perrault for ongoing projects. Background With the upcoming City Administrator vacancy, the City will need assistance with ongoing projects, such as labor negotiations and advising on Rice Creek Commons. The former City Administrator has drafted a contract to be considered by the City Council under Attachment A. Budget Impact The exact budget impact is unknown but will be more than offset by the vacancy of the City Administrator. Attachments Attachment A: Professional Services Agreement with Dave Perrault City of Arden Hills, Minnesota Professional Services Agreement AGREEMENT made this _______ day of _______, 20_______, by and between the CITY OF Arden Hills, a Minnesota municipal corporation (the City), and Dave Perrault (consultant). The parties agree as follows: 1. SCOPE OF WORK. The City of Arden Hills is entering into a professional services agreement with Dave Perrault to consult and advise on various projects related to the City of Arden Hills. These projects may include assisting with the collective bargaining agreement negotiations between the City and the International Union of Operating Engineers Local 49, assisting with ongoing project work relating to Rice Creek Commons, and miscellaneous operational items at the direction of the Interim City Administrator. Additional projects may be included upon mutual agreement between the City and Mr. Perrault. The Interim City Administrator shall be the primary contact for Mr. Perrault and shall provide necessary work direction. 2. PAYMENT FOR SERVICES. The City shall pay Mr. Perrault at the rate of $125.00 per hour. The minimum billing increment shall be fifteen minutes or .25 of an hour. 3. EQUIPMENT/IT NEEDS. The City shall make available any necessary equipment, software applications, or other item necessary for Mr. Perrault to provide services, this shall include but is not limited to a temporary laptop, software applications (Word, PowerPoint, Xcel), access to applicable network information and shared drives, as needed to complete projects referenced above. 3. GENERAL EXPENSES. The City shall pay any additionally incurred expenses by Mr. Perrault at cost, Mr. Perrault will keep an itemized record of said expenses. Any and all additional expenses must be pre-approved by the City Administrator. Any associated milage will be reimbursed at the 2024 Federal mileage rate, time spend travelling shall not be paid. 4. HOURS OF WORK. Mr. Perrault will generally be working on City-related items outside of normal working hours; the City shall not require work to be conducted during normal working hours unless mutually agreed upon. 5. STANDARD OF CARE. In performing his services, Mr. Perrault will use that degree of care and skill ordinarily exercised, under similar circumstances, by reputable members of his profession in the same locality at the time services are provided. No warranty, express or implied, is made or intended by Mr. Perrault’s undertaking herein or his performance of services. 6. TERMINATION. Either the City or Mr. Perrault may terminate this contract at any time, termination must be submitted in writing. Following termination, the City shall make any payment for services provided and not yet paid within fifteen days of termination. Unless terminated or otherwise mutually agreed upon, this contract shall terminate on December 31st, 2024. 7. LIABILITY AND INSURANCE. The City agrees to provide Mr. Perrault the following liability coverages: Commercial general liability with a minimum liability limit of $1,500,000 per occurrence. Said liability coverage shall be through the League of Minnesota Cities Insurance Trust (LMCIT) using standard LMCIT liability coverage forms or from a reputable insurance company authorized to do business in Minnesota. The City agrees to name Mr. Perrault as an additional insured for the purpose of execution of this contract. Liability - The City agrees to defend and indemnify Mr. Perrault from and against all claims, actions, damages, losses, and expenses arising out of his performance or failure to perform its duties arising under this Agreement. 8. INDEPENDENT CONTRACTOR STATUS. All services provided by Mr. Perrault pursuant to this Agreement shall be provided as an independent contractor and not as an employee of the City. 9. MISCELLANEOUS PROVISIONS a. Assignment. This Agreement is not assignable without the mutual written agreement of the parties. b. Data Practices Compliance. All data collected by Mr. Perrault pursuant to this Agreement shall be subject to the Minnesota Government Data Practices Act, Minnesota Statutes, Chapter 13. IN WITNESS WHEREOF, the City Council has caused this Agreement to be signed and executed on its behalf by its Mayor, and Dave Perrault has signed this Agreement, in duplicate, the day and year first written above. CITY OF ARDEN HILLS BY: _____________________________ Its Mayor DAVE PERRAULT __________________________________ PUBLIC HEARING -10A 'It �-`iIQEN�HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Jessica Jagoe, Community Development Director SUBJECT: Planning Case #24-009 — Public Hearing Required Applicant: Lake Johanna Fire Department Property Location: 3535 Pine Tree Drive Request: Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit and Site Plan Review Council Should Consider the Following: Hold the required public hearing for Planning Case 24-009, an application from the Lake Johanna Fire Department ("The Applicant") is requesting a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review for a proposed project on 3535 Pine Tree Drive ("Subject Property"). The proposal consists of construction of a 41,000 square foot Headquarters Fire Station facility that will house administrative staff as well as a response crew and includes training facilities for the Department. The City Council will be asked to make a formal decision regarding the application under Agenda Item 11 A. Background 1. Overview of Request The Applicant has submitted a land use application for Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review, proposing to develop a 3.7-acre site located at 3535 Pine Tree Drive. The Subject Property is currently owned by the Applicant. The Applicant is proposing to build a two-story fire station Headquarters facility of approximately 41,000 square feet with a training facility and training tower. The Lake Johanna Fire Department provides public fire and medical emergency response services to the Cities of Arden Hills, North Oaks, and Shoreview. The Applicant currently operates out of three stations, the proposed project would replace Station 4 located at 3615 Victoria Street in Shoreview and become the Headquarters for the Department. The Applicant is planning for construction of the new Headquarters facility to begin in 2025. The Headquarters Fire Station facility will consist of offices for five (5) full time staff members that would maintain typical Monday through Friday 8 to 5 business hours. The fire station will Page 1 of 14 have a crew of three (3) Firefighters on duty 24/7 to respond to fire and emergency medical service (EMS) calls. 2. History of the Subject Property In 2013, Bethel University purchased the property at 2 Pine Tree Drive to use the existing office building for higher education. This location is known as the Anderson Center campus. In 2020, Bethel University subdivided the approximate 43 acre site into three (3) parcels known as the 2 Pine Tree North plat. The Applicant purchased Lot 2 Block 1 of that plat in 2020. The other lot as part of this plat is now the location of New Perspective Senior Living. During the platting process, the Applicant was conducting their due diligence on the potential for acquiring the Subject Property. In 2018, the Applicant had completed a study that determined the need for a new Fire Station to be built on a site that could support the communities and their needs over "the next 50 years". It was determined that at a minimum the Department needed at least three (3) acres. This study also noted the future Fire Station should include six (6) drive through bays and living/sleeping quarters. The new Fire Station, because of size and equipment housed, would transition to become the new Headquarters Station and include necessary operational and training functions. Page 2 of 14 The Department is currently overseen by a Board of Directors, the Board ("Board") consists of City representatives (one (1) Arden Hills rep, one (1) North Oaks rep, and two (2) Shoreview reps) and three (3) member from the Department. The Board is responsible for an array of duties, such as, reviewing policies, approving long range plans and approving operating and capital budgets. In 2021, the Cities of Arden Hills, North Oaks, and Shoreview entered into a Joint Powers Agreement (JPA) for the purposes of acquiring and constructing improvements on property that was to be identified for the new Headquarters. The Applicant purchased the Subject Property in 2021 due to the location being ideal to improve access for emergency vehicles and improve response times to the service area. As part of the land use application, the Applicant has included a letter of support from the Board for advancement of this project to meet the service needs of the public. It is agreed upon as part of the JPA that the Applicant will transfer ownership of the Subject Property to the Lake Johanna Fire Department Headquarters JPA. Approvals 1. Planned Unit Development A Planned Unit Development (PUD) is required for all new development and redevelopment in the B-2 Zoning District. In addition, a PUD would allow for performance standard flexibility. This proposal involves both the initial Master Plan PUD and the Final PUD. Architectural Plan 2. Conditional Use Permit In the B-2 Zoning District, a Conditional Use Permit (CUP) is required for Public Use. The Cities of Arden Hills, North Oaks, and Shoreview contract with the Lake Johanna Fire Department to provide emergency response services for Fire and EMS calls to the public. The City refers to the Lake Johanna Fire Department in the 2040 Comprehensive Plan under Chapter 13, Public Facilities, Services, and Infrastructure. A conditional use is allowed if the landowner meets the general and specific standards set forth in the zoning ordinance. City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a Conditional Use Permit. The City Council should consider the effect of the proposed use upon the health, safety, convenience and general welfare of the owners and occupants of the surrounding land and the community, in general, including but not limited to the following factors: 1. Existing and anticipated traffic and parking conditions; The Applicant has provided as part of their submission a site plan of adjacent roads to identify fire response vehicle travel patterns will be north on Pine Tree Drive to the nearby controlled intersections. The Applicant has stated that the only exception to this Page 3 of 14 northerly route will be to respond to emergencies in the Hunters Park Condos, Hunters Park neighborhood, or Catholic United building. Their narrative states that traffic pre- emption will control the nearby intersections for the emergency vehicle, making it safer for the firefighters and the public. The Headquarters facility will consists of offices for five (5) full time staff members and would maintain typical Monday through Friday 8 to 5 business hours. The fire station will have a crew of three (3) Firefighters on duty 24/7 to respond to fire and EMS calls. The use of the facility for the 24/7 staffing of station crew is not anticipated to generate enough consistent traffic during peak or non peak hours to require any traffic control changes. A traffic study was not prepared as part of the application and may be waived by the City Council as part of the PUD. The Applicant has stated that based on their current call volume, they anticipate that this station would respond to around 2, 000 calls annually. The Consultant Engineer for the City has stated "it is not estimated that this project will generate more than 100 peak hour trips and a traffic study is not required. " 2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, and other nuisance characteristics; The narrative states that fire trucks leaving the station to respond to emergency calls will turn on their flashing emergency lights which will capture the traffic signal at Pine Tree and County Road E. After pulling forward out of the station, trucks will make a left turn to the north on Pine Tree Drive. As they approach County Road E, they will activate their sirens, and turn to the west or east as needed. 3. Drainage; The proposed site plan does not negatively impact drainage on adjacent properties and the Applicant has stormwater management onsite that is intended to meet the quantity and quality standards. The Application has been reviewed by the Public Works Director/City Engineer and will go through the Rice Creek Watershed approval process. 4. Population density; The Subject Property is guided as Community Mixed Use (CMU) in the 2040 Future Land Use Plan. The area is designated for a broad range of retail, shopping, services, and office space to meet the needs of the community and surrounding areas. The expected share of uses within this area are as follows: 10% to 50% Light Industrial; 10% to 70% Retail; 10% to 70% Office; and 10% to 50% Residential. A development intensity of up to 0.8 FAR maybe allowed. The Applicant is proposing a two-story 41, 000 square foot building that equals 0.25 FAR on the Subject Property. 5. Visual and land use compatibility with uses and structures on surrounding land; The proposed building materials will meet the B-2 preferred material requirement as identified in the Design Standards. The Architect for the project notes that a cantilevered canopy visually announces that this is the public entrance to the facility and the site features a plaza and flag display at the entry for visual structures. The Applicant has stated in their narrative that historically Fire Departments are very good neighbors and that two of the other stations are adjacent to residential land uses, schools and day cares. 6. Adjoining land values; The proposed development is not anticipated to negatively impact adjacent property values. Page 4 of 14 7. Park dedications where applicable; The Development Agreement for the 2 Pine Tree North plat indicated that Park Dedication required for Lots I and 2 will be determined by the City at the time of future development and will be memorialized in development agreements for those lots. The Applicant as part of this application is requesting the City waive the Public Use Dedications including the Park Dedication Fee. As part of their submittal, the Board has provided a letter of support for the Applicant's request. The Applicant and Board have received State of Minnesota funding for this project and applications have been made for federal funding. Funding for this Lake Johanna Fire Department Headquarters Station will primarily be through local tax dollars. At their meeting on July 10, 2024, the Planning Commission recommended the addition of Condition 20, which states that the Public Use Dedication/Park Dedication fee shall be waived for future development of Lot 2, Block I of the 2 Pine Tree North plat. 8. Orderly development of the neighborhood and the City within the general purpose and intent of the Zoning Code and the Comprehensive Development Plan for the City. The Lake Johanna Fire Department Headquarters Fire Station proposed facility at 3535 Pine Tree Drive is consistent with the purpose and intent with the policies within the City's Comprehensive Plan, the B-2 Zoning District and Guiding Plan for the B-2 District. Plan Evaluation Chapter 13, Zoning Regulations Review 1. District Provisions (B-2 General Business District) — Section 1320 — Meets Requirements Under the 2040 Comprehensive Plan, this site is guided as Community Mixed Use (CMU) on the land use plan and is zoned B-2 General Business District. Direction 2040 Comp. Plan Land Use Zoning North CMU — Community Mixed Use B-2 General Business District South CMU — Community Mixed Use B-2 General Business District East CMU — Community Mixed Use & HDR — High Density Residential B-2 General Business District & R-4 Multiple Dwelling District West CMU — Community Mixed Use B-2 General Business District The use for "Public Use" is allowed as a Conditional Use in all residential, commercial, and industrial zoning districts. The proposed site plan is attached as Attachment D. The table below provides the performance standards for the B-2 Zoning District and the preliminary analysis for the fire station: Ordinance Requirements 0 B-2 District Standards proposed Development Maximum Floor Area Ratio FAR 0.8 0.25 Maximum Structure Coverage 45% 18% Minimum Landscape Lot Area 20% 34% Minimum Front Yard Setback 50 feet Approx. 90 feet Minimum Rear Yard Setback 20 feet 136 feet Minimum Side Yard Setback 10 feet (min)/ 20 feet total 85 feet (south) and 68 feet (north)/153 feet total Page 5 of 14 Minimum Lot Area 00 square feet 3.7 acres/161,172 square feet Maximum Building Height 50 feet r Headquarters Building — 30 feet Training Tower — 42 feet 2. Design Standards - Section 1325.05 and 1325.055 A. Building Design — Flexibility Requested Section 1325.05 Subd. 8, E of the Arden Hills City Code states "the arrangement, massing, materials and colors shall work to create a high quality development that is responsive to existing buildings, site features, and site design on adjoining sites in the district." There are seven (7) evaluators for building design with one of those stating that at least fifty percent (50%) of the largest building on each site shall be constructed at the front setback line." The other evaluators to consider in review of the building design are that facade treatments shall be carried around all sides, avoid long unbroken expanses and to create visual interest from the street, awnings and overhangs shall be provided at the primary entryway, any multi -level building shall distinguish the ground floor level from the upper floors. Architectural plans are included in Attachment E. The Applicant is proposing a two-story building of approximately 41,000 square feet for their Headquarters facility. The front lot line is Pine Tree Drive and the front setback line is at 50 feet. The Applicant's site plan shows the building would be constructed at approximately 90 feet. Site Plan arx STATION � '� I I wcic I (? PAVING i I PINE TREE DRIVE Tom, B. Exterior Materials — Flexibility Requested At least seventy-five (75) percent of the exterior building materials should be made of brick masonry, tile masonry, natural stone or its synthetic equivalent, decorative concrete plank, transparent glass or any combination thereof. Trim and other accent or decorative features may be metal, wood, split faced block, EIFS, or stucco. Metals shall have a matte finish and have visible corner moldings and trim when used on exterior walls. Undesirable materials include simulated brick, vinyl or aluminum siding, sheet or corrugated metal siding, plain concrete blocks or panels, brightly colored metal roofing or canopies, pre -cast tilt -up walls, and mirrored or reflective glass. Building colors shall be muted. Recommended colors include browns, grays, tans, beiges, and dark or muted green, blues, and reds. Bright or brilliant colors and sharply contrasting Page 6 of 14 colors may be used for only accent purposes occupying a maximum of five percent (5%) of building fagades. The City Council should evaluate the architectural style and building character based on the quality of its design and on its relationship to its surroundings. Site characteristics to be evaluated for this purpose include, but are not limited to, building and landscaping materials, colors, textures, shapes, massing, building components, height, roof -line, and setback. A full plan set of building elevations is included as Attachment E. Planning Staff has provided the review below on building materials and transparency as shared by the Applicant in order for the City Council to attain a better understanding of the full scope of their project design. The proposed building complies with building materials consisting of brick, glass, or metal trim on all elevations. The transparency requirements for new developments within the B-2 Zoning District have been considered in the window placement and design for the fire station facility. Section 1325.05, Subd. 8, F. states that fifty percent (50%) of all first level building fagades that front a public street shall be comprised of transparent windows or doors in order to allow views of interior uses and activities. The following table shows the breakdown of materials for the fire station: Required Proposed Other Required Proposed Proposed Preferred Preferred Materials Transparency Transparency Transparency Materials Materials *first level *full elevation East 75% 95% 5% 50% 57% 46% (front) Fagade North 75% 94% 6% N/A 23% 10% Facade South 75% 97% 3% N/A 5% 4% Facade West 75% 85% 15% N/A 15% 10% Fagade The buildings design has facade stepping and a variation in rooflines as viewed from all elevations. The Applicant has noted that they have incorporated many "Green Building" sustainable design features in this project. As noted in the application materials, the Applicant began the efforts for studying the Department needs and designing this project back in 2018. This project is intended to meet their needs for "the next 50 years" and will provide for the administrative, operational (i.e. Headquarters), apparatus bays, and training facility. This facility will be used for classroom and hands-on training both inside the training room and outside. There could be groups ranging from 10-40 firefighters in attendance a few times each week. The four (4) story training tower on the west (rear) side of the building will use non -toxic fire props, theatrical smoke machines and will also be used for ladder training and rope rescue training. The fire station project with the proposed design has received State funding towards future construction. As part of their design process in 2020/21, the Applicant shared schematic "artist's views" of their project plans and renderings with each City Council for feedback. This information was used as part of their due diligence prior to preparation of their project bid documents which have been finalized. The Applicant has submitted to the City for the land use approval prior to applying for construction permits. Page 7 of 14 Rendering of West (rear) and South Elevations C. Lighting — Meets Requirements The Zoning Code requires exterior lighting to be consistent in type, design, scale, and color to create unity in the Districts. Exterior lighting for parking lots and buildings shall not be excessive and shall be directed at their intended purposes. Any light or combination of lights shall not cast light that exceeds a meter reading of one (1) foot candle on the travel lanes of ad j oining public streets or 0.4 foot candles on adjoining residential property. The proposed plan includes LED fixtures for area lights at a maximum of 30 feet to the top of the fixture, a monument sign and flag pole light, and then soffit lighting above the doorways/entry on the building. The proposed lighting is consistent with the use and the surrounding area. The Applicant has submitted a photometric plan that identifies the types of light fixtures and quantities. The Subject Property is not adjacent to a residential property. The photometric plan shows that proposed lighting will not exceed a meter reading of one (1) foot candle on the travel lanes on Pine Tree Drive. As a condition of approval, all lighting shall be downward directed shoebox style with flush lenses. Details about the proposed lighting are found in Attachment F. D. Screening — Meets Requirements Screens and fencing help minimize adverse impacts of public nuisances, such as noise. Trash and recycling equipment, materials, and containers shall be fully enclosed and integrated into the architecture of the buildings. All mechanical equipment, whether roof -mounted or ground - mounted should be integrated into the architecture of the building. It shall be completely screened from the ground -level view of adjacent properties and public streets. Page 8 of 14 There is a generator, electrical transformer, and trash enclosure located on the rear of the building that are screened by the building to the public street. The trash enclosure will feature metal trash enclosure gates and is constructed with brick consistent with the building design. The Applicant did not include roof plans or associated building sections to illustrate all roof -mounted mechanical equipment is screened. Planning staff has included a condition recommending that all rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. E. Landscaping — Flexibility Requested Section 1320.06 — District Requirements Chart of the City Code requires a minimum landscape lot area of 20% or 32,234 square feet for the Subject Property in the B-2 Zoning District. The Applicant is proposing a landscape lot area of approximately 34% percent or 55,835 square feet. Additionally, at least 10% or 3,223 square feet of the total landscaped area (i.e. 32,234 square feet) shall be covered with perennials and/or shrubbery. The Applicant is proposing perennial and/or shrubbery of approximately 9% or 2,926 square feet. Per the Applicant, a revised landscape plan will be submitted with the future building permit application that would comply with the 10% plantings of perennial and/or shrubbery and it is not their intent to seek flexibility from this requirement. Lastly, planting islands shall occupy 10% or 2,346 square feet of the parking area (i.e. 23,465 square feet). The plans show the provided planting islands are covering approximately 10.5% or 2,459 square of the parking area. The site contains 984 caliper inches of significant trees. Section 1325.055 Subd. 5 allows for the removal of fewer than ten (10) percent of the caliper inches of significant trees on the property without requiring mitigation. Ten percent of 984 is 98.4 caliper inches. The Applicant proposes removing 984 caliper inches of trees, meaning the Applicant is responsible for mitigation of 886 caliper inches removed above 10 percent. Per Section 1325.055 Subd. 6, the number of caliper inches of trees required for replanting is determined at a rate of 1:2 or one (1) inch replaced for every two (2) inches lost. Existing 10% of Proposed Inches in Required Proposed Existing Removal excess of 10% Replacement Replacement 984 caliper 98.4 caliper 984 caliper 886 caliper 443 caliper 48 caliper inches inches inches inches inches inches The Applicant is seeking flexibility for the required replacement of 443 caliper inches based on the total inches removed and the rate of replacement due to the need to maintain exiting sightlines for the firefighters when they leave for a call. The Applicant has noted the landscaping plan includes an abundance of plantings and is proposing to plant 48 caliper inches on site. The Applicant's Tree Preservation Plan (Sheet L 101) for the landscaping requirements table indicates a proposed 128 caliper inches to be provided. For the purposes of this report, Planning Staff has used the figures as calculated on the Landscaping Details and Notes Plan (Sheet L104) which includes the tree inventory schedule. The Applicant has stated in their narrative that they would be willing to consider an off -site location to satisfy this requirement, but does not have a location identified. They have also requested the City waive the payment in lieu of option (i.e. cost of materials and installation plus 10%) which would be considered as part of the PUD review. At the July 10, 2024 Planning Commission meeting, the Planning Commission considered the Applicant's request for flexibility to recommend approval of the proposed tree replacement at 48 caliper inches and to waive requirements for planting at an off -site location and for a payment in lieu of option. Upon review, the Commission determined that the proposed 48 caliper inches did not adequately satisfy the intent of the City's ordinance for tree mitigation. The Planning Page 9 of 14 Commission added Condition 19 to the conditions of approval, which states The Applicant shall follow city code accordingly for tree mitigation of 300 caliper inches. The City Code requires a minimum of one (1) tree be provided along the right-of-way of every 40 feet of public street frontage. The proposed development would be required to plant seven (7) trees along Pine Tree Drive which the Applicant has satisfied in their landscaping plan as presented. A landscape plan is included as Attachment H. F. Pedestrian and Bicycle Circulation — Meets Requirements Section 1325.05 Subd. 8, P states new building construction shall include construction of a minimum of six (6) foot concrete sidewalk adjacent to or in all right-of-way. In addition, there shall be an internal sidewalk connection linking the primary entrance with the public sidewalk. The Applicant has indicated they will comply with this requirement. The Applicant is not proposing a bicycle rack/bicycle parking as part of this development. City Code Section 1325.05 Subd, 8, Q applies to commercial uses and requires one (1) space for every 20 parking spaces. 3. Off -Street Parking Standards - Section 1325.06 A. Parking Setbacks — Meets Requirements The City Code requires off-street parking areas to be located a minimum of 20 feet from the right- of-way of any public street and five (5) feet from any side or rear lot lines. The Applicant has satisfied these requirements with the site plan as presented. B. Number of Parking Stalls — Planning Commission Recommendation Per City Code 1325.06, there are general categories that determine the number of parking spaces that would need to be provided. Public Use is listed under the category of "Uses Not Specifically Noted Including Public Uses — As Determined by the City Council after recommendation by Planning Commission". Page 10 of 14 The Applicant is proposing 54 parking stalls. As noted in their narrative, the Headquarters facility will generally have five (5) full time staff members that would maintain typical Monday through Friday 8 to 5 business hours. The fire station will have a crew of three (3) Firefighters on duty 24/7 to respond to fire and emergency medical service (EMS) calls. In addition, this facility will be used for classroom and hands-on training with groups ranging from 10-40 firefighters in attendance a few times each week. At its July 10, 2024 meeting, the Planning Commission made a recommendation for the approval of the parking plan as presented. C. Driveways — Recommended Condition Within the parking requirements, the City has a standard for the maximum driveway width for residential and commercial, but not public use. As an example for commercial, the maximum driveway width is 32 feet on City streets. The Applicant is proposing two (2) driveway accesses along Pine Tree Drive. The southerly access is proposed to be 117 feet and the northerly access is proposed to be 28 feet. An initial comment from the Consultant Engineer was the spacing between Bethel's main entrance and the proposed employee entrance should be reconsidered to provide more spacing. Upon review of the Application, the Public Works Director/City Engineer provided comment in a PW/Engineering Division memo dated June 27, 2024 (Attachment J) for the Applicant to review northern driveway access distance as it relates to the existing driveway access from the property to the north and to review southern driveway access to better align with the driveway access across Pine Tree Drive, if possible. At the July 10 Planning Commission meeting, it was recommended as a condition of application approval that all items identified in the June 27, 2024 memo be addressed and adopted. 4. Sign Code — Section 1240.02 A. Freestanding Signs — Verification Needed The Subject Property is located in Sign District 7. Properties in Sign District 7 are allowed one (1) freestanding sign measuring up to 25 square feet in copy area and not exceeding eight (8) feet in height. Freestanding signs shall be located at least five (5) feet from any property line. Sign copy area is defined as the area in square feet of the smallest rectangle, circle, or triangle that contains the sign copy. The Applicant is proposing a monument sign along Pine Tree Drive as shown on the site plan in compliance with setbacks requirements. The proposed externally illuminated freestanding sign is five (5) feet in height and has a total sign copy area of 36 square feet as shown on the sign illustration including logo and text, not address information. Also, the total area of a freestanding sign shall not exceed 1.5 times the permitted sign copy area of said sign which would be 37.5 square feet for this application. The Applicant has indicated the proposed freestanding sign has a total area of 30 square feet (60 inches tall by 72 inches wide). These dimensions would result in a proposed copy area that exceeds the total sign area. The Applicant stated at the Planning Commission meeting on July 10, 2024 their intent to comply with the sign code and that flexibility is not being sought for signage. Staff will confirm the conformance of the proposed signage with the sign code during the sign permit review for each individual sign. Sign materials are noted to be consistent with building materials. The sign plan is shown in Attachment G. B. Wall Signs — Meets Requirements Properties in Sign District 7 are allowed wall signs up to 45 square feet. The Applicant is proposing two (2) non illuminated totaling 28 square feet of wall signs to be located on the east and west elevations at the apparatus bays. The sign plan is shown in Attachment G. Page 11 of 14 5. Section 1355.04 Procedural Requirements for Specific Applications A public hearing for a CUP and PUD request is required before the request can be brought before the City Council. The applicant or its representative shall be given the opportunity to appear before the Planning Commission to answer questions or give explanations regarding the proposal. Upon completion of the public hearing and its study and consideration of the application, the Planning Commission shall submit its written report, containing its findings, conclusions, and recommendations as to the application, to the City Council. Plan Evaluation Summary The table below provides the performance standards for the B-2 Zoning District and the preliminary analysis for the proposed development: Ordinanc quire sed Devel Maximum Floor Area Ratio FAR 0.8 0.25 Maximum Building Height 50 feet Headquarters Building — 30 feet Training Tower — 42 feet Maximum Structure Coverage 45% 18% Minimum Landscape Lot Area 20% 34% Minimum Front Yard Setback 50 feet Approx. 90 feet Minimum Rear Yard Setback 20 feet 136 feet Minimum Side Yard Setback 10 feet (min)/ 85 feet (south) and 68 feet 20 feet total north /153 feet total Building Design - Positioning At Front Setback = 50 feet Building = Approx. 90 Minimum Parking Requirements Public Use - 54 Parking Stalls Recommendation from PC Off -Street Parking Setbacks 20 feet from ROW/5 feet West (rear) — 46 feet from side & rear lot lines South (side) — 65 feet North side — 20 feet Building Fa ade Transparency 50% transparency at front Seeks Flexibility Building Materials 75% brick, tile, natural Meets Requirements stone, decorative concrete, transparent glass or any combination thereof Lighting/Photometric Plan Meter reading of no more Meets Requirements than one (1) foot candle on the travel lanes Page 12 of 14 Screening Trash Enclosure Meets Requirements Landscaping Perennial/Shrubs/Planting Islands Applicant intends to comply with standard Landscaping Replacement Trees Seeks Flexibility Landscaping Boulevard Trees - 7 Meets Requirements Pedestrian and Bicycle Circulation 6 foot sidewalk & Bike Rack Meets Requirements Freestanding Sign — Copy Area 25 square feet Applicant intends to comply with standard Freestanding Sign — Total Sign Area 37.5 square feet Applicant intends to comply with standard Wall Signage Sign District 7 (Max. 45 square feet) 28 square feet Planning Commission Review The Planning Commission reviewed this application at the July 10, 2024 meeting. Three recommended conditions of approval were added by the Planning Commission to include "All items identified in the June 27, 2024 PW/Engineering Division memo shall be addressed. All comments shall be adopted herein by reference;" "The Applicant shall follow city code accordingly for tree mitigation of 300 caliper inches;" and "The Public Use Dedication/Park Dedication fee shall be waived for future development of Lot 2, Block 1 of the 2 Pine Tree North plat." The Commission voted 6-0 to recommend approval with 20 conditions of Planning Case 24- 009. Additional Review Building Official The Building Official has reviewed the plans and has no additional comments at this time. A Building Permit will be required prior to any construction taking place. Public Works Director/City Engineer The Public Works Director/City Engineer has reviewed the plans and has provided the Applicant with a comment letter (Attachment J). All comments shall be adopted herein by reference as a condition of approval. Public Comments Notice was published in the Pioneer Press on July 12, 2024. Notice was prepared by the City and mailed to property owners within 1,000 feet of the subject property. One comment was received at the Planning Commission public hearing. The comment was concerning the quantity of tree removal and possible preservation of more trees. Additionally, the Applicant hosted a neighborhood meeting on May 30, 2024 and invited properties within 1,000 feet of the Subject Property to attend in order to learn more about the project. Along with representatives from the City, there were three other attendees. Feedback was generally supportive of the project. Page 13 of 14 Attachments A. Land Use Application B. Location Map C. Narrative D. Site and Civil Plans E. Architectural Plans F. Lighting Plan G. Signage Plan H. Landscape Plans I. Board Letter of Support I Engineering Review Memo K. PC Staff Report L. Draft PC Minutes M. Presentation Page 14 of 14 EN HILLS 1245 West Highway 96 For Office Use Only Planning Case No. 24- Submittal Date Application Completed Date Arden Hills, Minnesota 55112 Accepted by _ Telephone (651) 792-7800 Receipt Number _ Fax (651) 634-5137 Council Decision www.cityofardenhills.org _ Council Decision Date 2024 LAND USE APPLICATION Applicant Information _ A licant: % A , _ Address: 5rj G V U4/ _sr�i�p Telephone No.: rQ��'� Other: r' Pnv ni„ Property Owner: Owner Address: Owner Telephone No. Address of Property Involved: Legal Description: �Je, Type of Use: Ur Zone: _S/I2 Type of Request ❑ Comprehensive Plan Amendment (Fee: $550 + Escrow: $2,500) Conditional Use or Interim Use Permit/CUP or ]UP Amendment (Fee: $400 + Escrow: $1,500) ❑ Preliminary Plat (Fee: $500 + Escrow: $2,500) ❑ Final Plat (Fee: $450 + Escrow: $1,000) ❑ Concept Plan Review (Fee: $300 + Escrow: $750) Master Planned Unit Development or Master Special Development Plan (Fee: $600 + Escrow: $2,500) Final Planned Unit Development or Final Special Development Plan (Fee: $350 + Escrow: $2,000) ❑ Planned Unit Development Amendment or Special Development Plan Amendment (Fee: $400 + Escrow: $1,500) Site Plan Review (Fee: $450 + Escrow: $1,500) Property Acreage: ❑ Rezoning or TCAAP Reggulating Plan Amendment (Fee: $500 + Escrow: $1,500) ❑ Zoning Code or TCAAP Redevelopment Code Amendment (Fee: $400 + Escrow: $1,500) ❑ City Code Amendment (Fee: $350 + Escrow: $1,500) ❑ Lot Split/Minor Subdivision (R-1 and R-2 Districts Only) (Fee: $350 + Escrow: $1,500) ❑ Variance or Permitted Adjustment (Fee: $350 + Escrow: $1,000) ❑ Vacation of Easement or Right -of -Way (Fee: $150 + Escrow: $1,000) ❑ Appeal of Administrative Decision (Fee: $150 + Escrow: $1,000) ❑ Land Use Requests — Not Already Specified (Fee: $150 + Escrow: $1,000 Page 1 of 3 Brief Description of Request 1 �-f—wo ►Mrll� "!...A ie, F /__F *IMPORTANT* Certain applications are subject to review and approval by the Rice Creek Watershed District. Contact RCWD directly at 763-398-3070 for additional information. The land use application fees do not cover building, sign, or other permit fees that may be required upon approval of a land use application. All applications will be subject to additional fees for reimbursement of consultant costs associated with filing, reviewing, and processing of application in the form of an escrow to the City. Filing & Information Requirements The City requests that you make a pre -application meeting with the Community Development Director to discuss the application process, requirements, and deadlines. Unless waived by the Community Development Director or Planning Commission, a certified survey of the property is required for all applications. A checklist with additional application requirements can be found at www.cityofardenhills.org/landuseapplications. Complete/Incomplete Applications Under Minnesota Statute, Chapter 15.99, cities have 15 business days to review all plans and application materials to ensure they satisfy City requirements. During the 15 day review period, planning staff will provide written comments on the application and may request plan revisions. If the application is determined to be complete, Minnesota State Statute then requires the City to approve or deny the application within 60 days, up to 120 days. If not complete, the City may require plan revisions and/or additional information before the application is scheduled for Planning Commission review and/or City Council action. Project will not be scheduled for any meeting until the application submittal is found to be complete by the Community Development Director. Payment of Fees and Escrows The undersigned acknowledges that she/he understands that before a land use application can be deemed complete, all required fees and escrows must be paid to the City. The applicant is responsible for all costs incurred by the City related to the processing of this application. Each separate land use request shall be charged a separate administrative fee and escrow even if submitted on the same application. Costs expended in reviewing and processing an application will be charged against the cash escrow and credited to the City. Charges to the escrow may include planning and engineering staff time, City Attorney and consulting fees, and mailing costs. If, at any time, a required cash escrow is depleted to less than 20 percent of its original amount, the applicant shall deposit additional funds in the cash escrow account as determined by the City. The City may withhold final action on a land use application, withhold building permits, and/or rescind prior action until all fees have been paid. Unused portions of an escrow are returned to the applicant upon successful implementation of an approved plan. The escrow may be reduced or increased by the Community Development Director on a project by project basis. Notice of Meeting Attendance In order for the Planning Commission and the City Council to consider any application, the applicant or a designated representative must be present at the scheduled meeting. If not, the matter may be tabled until the next available agenda. Page 2 of 3 1-e Planning Commission meetings are typically held on the first Wednesday after the first Monday of each month at 6:30 PM, though please contact City Hall to verify the meeting date and time. City Council meetings are held typically the last Monday of the some month at 7:00 PM. Meetings are held in the Council Chambers at the City of Arden Hills, 1245 West Highway 96, Arden Hills, Minnesota 55112, unless otherwise stated. The schedules below are for reference purposes only. Project will not be scheduled fbr any meeting until the application submittal is found to be complete by the Community Development Director. 2024 Planning Commission and City Council Schedule (*subject to change) TENTATIVE PLANNING COMMISSION MEETING DATE* (Generally held on the first Wednesday after the first Monday at 6:30 .m. TENTATIVE CITY COUNCIL. MEETING DATE* (Generally held on the fourth Monday at 7:00 p.m.) DEADLINE FOR LAND USE APPLICATION SUBMISSION (I" day of the preceding month) „ January'3 February 12 December 1.12023 February 7 March 1'1 Januga2 March 6 i1.8 February 1 613 April22 March I May 8. May 27* April 1 June 5 June 24 May 1 Jul 10 rescheduled. date July 22 June 3 August 7 August 26 Ju 1 _ S ternber 4 September 23 A ust 1 October 9 October 28 September 2 November 6 November 25 October I December 4 Januajj13 2Q25 November 1 Ackn9wledg11m2nt jlnti ,Siena ure I hereby apply for the above consideration and declare that the information and materials submitted with this application are complete and accurate per city code and ordinance requirements. I fully understand that I am responsible for all costs incurre~ by the City related to the processing of this application. /17 Property Owner Sig re (Required) Date Applicant Signature (If different than the property owner) Date Please contact the Community Development Director at 651-792-7800 if you have any questions regarding this application. additional copies of this application form are available on the City's websfte. www cfhRlardenhrllslQr� &ngyM ons Page 3 of 3 Location Map rry Rr .irI f •:t norm n 1 mill i miiiiiiiiiiiiiiim .�■�Ir -V7 MRi jklowns ONE a Uft 7/3/2024, 1:54:16 PM 1:8,000 0 0.05 0.1 0.2 mi Override 1 - Cities 0 0.1 0.2 0.4 km - Personal Property K County Offices Tax Parcels Ramsey County Ramsey County MN LADE JOHANNA FIRE 0EPARTPVgEP9 7 4 r 5545 LEXINGTON AVENUE NORTH • SHOREVIEW, MN 55126 OFFICE (651) 415-2100 - FAX (651) 486-8826 3 The Lake Johanna Fire Department The Lake Johanna Fire Department provides Fire and EMS response to the cities of Arden Hills, North Oaks, and Shoreview. We operate three fire stations; two stations are staffed 24 hours a day. Station 2 is located at 4676 Hodgson Rd, Station 3 at 5545 Lexington Ave. and Station 4 at 3615 Victoria St. We anticipate staffing Station 3 over the next several years. We currently have five full-time staff and 80 part-time firefighters who work shifts at the stations. We require that all our Firefighters are State Certified Firefighter II and State Certified EMT or higher. In 2021, we are on pace to run about 4,000 Fire/EMS calls for the year. New Headquarters Building - Operations The building at the 3535 Pine Tree Dr. address will be used as a new Headquarters/Fire Station and replace station 4 located at 3615 Victoria St. The Headquarters' Office consists of five (5) full-time staff members and would maintain typical Monday thru Friday 8-5 business hours, This fire station will be staffed 24/7 with an additional two (2) to four (4) firefighters to respond to Fire/EMS calls. Depending on the type of call, this station would typically respond with 1 truck for an EMS call, multiple units may respond for Fire calls. Based on the current call volume, we would anticipate that this station would respond to around 2,000 calls annually. As our trucks respond to emergency calls, they will drive out of the apparatus bay and turn left on Pine Tree Drive moving north to County Road E. For Emergency calls, we will be able to activate the traffic lights at County Road E and Pine Tree Drive once the emergency lights are activated on any apparatus. Traffic pre-emption will control the intersection for the emergency vehicle, making it safer for the firefighters and the public. New Headquarters Building -Training Facility This facility will also be used for classroom and hands-on training both inside the training room and outside. The number of firefighters training will vary from session to session. Typically, groups ranging between 10 — 40 firefighters would be attending the training offered a few times each week. This facility will also include a four (4) story training tower on the west side of the building. This will have live fire props inside the structure on two floors. The fire props will be natural gas fires which use non- toxic, theatrical smoke machines. This 4-story training tower will also be used for ladder training and rope rescue training. New Headquarters Building - Public Fire Education Our department is actively involved in Public Fire Education. We conduct various Public Fire Education and station tours to groups throughout the year, as well as larger events such as the Fire Prevention Week Open house. New Headquarters Building - as your neighbor We believe the New Headquarters/Station is ideally located to provide service to all those in Arden Hills, North Oaks, and Shoreview. We will fit nicely into this new location and believe it will not have a negative impact on nearby residents or businesses. Station 3 is located next to Turtle Lake Elementary School and Station 2 next to Kinder Care, Montessori School and Shoreview Senior Living Care facility. �� 1311 BUETOW 2 ARCHITECTS, INC. PROJECT EXPLANATION A Study in 2018 determined that a new Fire Station should be built on a new site to meet the needs of "the next 50 years". The size should be at least 3 acres and a site of 3.7 acres was purchased in 2020. The Study also noted the Station should include 6 drive through bays and living/sleeping quarters. The new Fire Station would then because of size and equipment contained would transition to become the new Headquarters Station and include much needed training functions. Exterior Design Concept Overall Image from Pine Tree Drive - The building exterior reflects the interior functions to the Public. The north half expresses the HQ office function on the first floor and firefighters dayroom, sleeping quarters and wellness spaces on the second level. The south half of the building is the apparatus bays and associated functions. The north half materials of glass and brick represent "office" and brick structural concrete wall panels on the south the "apparatus bays". Administrative Offices Entry/Main Entry A sloped cantilevered metal canopy visually announces that this is the Public entrance to the facility. It is adjacent the Memorial Entry Plaza and Flag display. As one enters the public parking area from Pine Tree Drive after passing the monument sign, the entry is very visible as the sculptural canopy reaches out toward the parking. LJFD Headquarters The function of offices is reinforced by the glass that wraps the northeast building corner around the offices on the inside. This glass feature is repeated at the set back second floor. Both levels include a horizontal aluminum sunscreen as the design utilizes many "Green Building" sustainable design features. The second level canopy over the exterior deck space is similar to the main entry canopy. The Fire Chiefs' vehicles garage adjacent the offices frames the transition between office and apparatus bays. Apparatus Bays and Training Area The south half of the building is brick structural insulated wall panels. The large bi-folding doors of the apparatus bays are the predominant feature. Above each vehicle exit door will be a clerestory window. The projecting clad tower form in the middle of the doors will be the backdrop for the LJFD logo emblem. Behind this projected piece inside the building are the associated spaces for firefighting and training. Floor Plan Design Concept Circulation Spine- First Level Upon entering the LJFD Headquarters lobby a corridor organizes the first floor ending in the access to the apparatus bays. The administrative offices are to the east and Training, fire/watch room and associated rooms to the west. The six drive through bays are bisected by the firefighting spaces such as turn out gear and training spaces. The multi -level training areas with props are the build out on the west side of the building. Circulation Spine- Second Level Similar to the first level, the second floor has a hall with a stair at each end and elevator centrally located. An efficient loop off of this spine accesses the sleeping rooms. Training Space The training spaces are multi -level and are vertically connected by the hose/training tower. BUETOW 2 ARCHITECTS, INC. AN ARCHITECTURAL SERVICES COMPANY 2905 DEAN PARKWAY SUITEA MINNEAPOLIS MINNESOTA 55416 TELEPHONE (612) 455-2626 811 .r $ LAKE JOHANNA FIRE DEPARTMENT ®= 5545 LEXINGTON AVENUE NORTH, SHOREVIEW, MN 55126 OFFICE (651) 415-2100 Date: May 24, 2024 Community Development Director Jessica Jagoe 1245 West Highway 96 Arden Hills, MN. 55112 Dear Jessica, I would like to provide some additional information and address a few questions about our Headquarters Fire Station project to be located at 3535 Pine Tree Dr. Lake Johanna Fire Department The Lake Johanna Fire Department was incorporated in 1943 and serves the cities of Arden Hills, North Oaks, and Shoreview. The department operates a total of three fire stations to provide service to over 31 square miles, and a combined population of over 42,000 residents. We staff all three stations with Firefighters who are on duty 24/7. Our firefighters are EMTs or Paramedics and will respond to about 4,800 calls this year. The primary Advanced Life Support (ALS) transport services are provided by Allina for all three cities. Building Use This new Headquarters Fire Station facility will house our administrative staff as well as a response crew. There will be offices for the Fire Chief, three (3) Assistant Chiefs, and the Office Manager. The fire station will have a crew of three (3) Firefighters on duty 24/7 to respond to fire and EMS calls. The building will have a large training room and many different built-in training props for use all year long. There is a 4- story training tower in the rear of the station that will have live fire props on multiple floors. These props will be fueled by natural gas and use theatrical smoke which is non -toxic and dissipates very quickly. Noise Concerns Fire trucks leaving the station to respond to emergency calls will turn on their flashing emergency lights which will capture the traffic signal at Pine Tree and County Road E. After pulling forward out of the station onto the apron (driveway) they will make a left turn to the north on Pine Tree Drive. As they approach County Road E, they will activate their sirens, and turn to the west or east as needed. The only exception to this northerly route will be to respond to emergencies in the Hunters Park Condos, Hunters Park neighborhood, or Catholic United building. Some fire departments used to have large sirens on telephone poles that sound when there is a fire call. Our department does not use those. When there is a fire or EMS call, the firefighters are alerted by lights and speakers inside the building, as well as their radios and mobile phones. For training occurring at this station, most of the training will occur inside the building, either in the classroom or apparatus bays. The training occurring outside will typically include fire truck pumping operations, aerial ladder training, and ground ladder training. On occasion the firefighters will be running chain saws and other rescue tools. Page 1 of 2 LAKE JOHANNA FIRE DEPARTMENT Neighborly Historically our fire department has been a very good neighbor to those around us. Our Hodgson Road Fire Station is between a KinderCare and a Shoreview Senior Living Care facility while across the street is Montessori School and single-family homes. Our current Headquarters Station on Lexington is across the street from Turtle Lake Elementary School. If anyone has additional questions or concerns, please contact us at admin@lifd.org. Sincerely, Tim Boehlke Fire Chief Page 2 of 2 1. Narrative- reasons for flexibilities The only item that we would need consideration for is landscaping. The existing site is covered with trees. These are being removed for the proposed building and paved areas that are required. The site will have an abundance of landscaping and the only request was that the exiting sightlines be clear for the firefighters when they leave for a call. Any requirement for trees will be fulfilled elsewhere as desired by the City. LAKE JOHANNA FIRE DEPARTMENT 5545 LEXINGTON AVENUE NORTH • SHOREVIEW, MN 55126 OFFICE (651) 415-2100 • FAX (651) 486-8826 July 3, 2024 Honorable members of the Arden Hills City Council and Planning Commission 1245 W Highway 96 Arden Hills, MN 55112 RE: Land use application for the proposed Lake Johanna Fire Department Headquarters Station Honorable members, In and effort to reduce project costs that will impact taxpayers, I am formally requesting that the City of Arden Hills waive the following fees: 1.) Waive Park dedication fees. 2.) Waive fees for replacement caliper inches on trees that would not be planted. We greatly appreciate the Planning Commission and City Councils consideration of our request. Respectfully submitted, Tim Boehlke Fire Chief SERVING • ARDEN HILLS • NORTH OAKS • SHOREVIEW • SINCE 1943 DESCRIPTION OF PROPERTY SURVEYED (Per Warranty Deed Doc. Nos. A4551451 and T2512961) Parcel I: All of the Northwest one -quarter of the Northeast one quarter (NW 1/4 of NE 1/4) of Section 34, Township 30 North, Range 23 West, except the following fl a described parcels: A) The West one hundred twenty (W. 120) feet of the East three hundred forty-seven (E. 347) feet of the North two hundred eighty-three (N. 283) feet the —Card B) The North three hundred forty-three (N. 343) feet thereof lying West of a line, being a ontinuation of the Westerly line projected a Southerly direction, of the West one hundred twenty (W. 120) feet of the East three hundred forty-seven (E. 347) feet of the North two a III eighty-three (N. 283) feet of said NW 1/4 ofNE 1/4. C) That port of the East 100 feet of the Northwest Quarter of the Northeast Quarter of Section 34, Township 30, Range 23 West, which lies South of the extended South right-of-way line of Harriet Avenue as said line is shown in the plat of Hunter's Park Fourth Addition. D) That port of the Northwest Quarter of the Northeast Quarter of Section 34. Township 30. Range 23. bounded by the fallowing described line: Beginning at a point on the East line of said Northwest Quarter of the Northeast Quarter. distant 1.395.75 feet Northerly from the Southeast r of the Southwest Quarter of the Northeast Quarter of said Section 34. thence Westerly 70.00 feet at right angles to said East line: thence Northerly. parallel with said West line to a line parallel with and distant 43.00 feet Southerly from the North line of said Northwest Quarter of the Northeast Quarter; thence Easterly along last said parallel line to the East line of said Northwest Quarter of the Northeast Quarter: thence Southerly along said East line to the point of beginning. E) The East 347 feet of the North 343 feet of the Northwest Quarter of the Northeast Quarter (NW 1/4 of NE 1/4) of Section 34, Township 30, Range 23 a cording to the United States Government Survey thereof, Ramsey County, Minnesota; a cepting therefrom any part thereof ontained in the deeded legal description to the City of Arden Hit in Warranty Deed dated April 3, 1978, filed April 25, 1978, as Document No. 2000781 which deeded legal description is described as fall aws: That part of the Northwest Quarter of the Northeast Quarter of Section 34, Township 30, Range 23, bounded by the following described line: Beginning at a point on the East line of said Northwest Quarter of the Northeast Quarter, distant 1,395.75 feet Northerly from the Southeast of the Southwest Quarter of the Northeast Quarter of said Section 34; thence Westerly 70.00 feet at right angles to said East line; thence Northerly parallel with said East tine to a line parallel with and distant 43.00 feet Southerly from the North fine of said Northwest Quarte'Nor of the Northeast Quarter; thence Easterly aI.rq last said parallel line to the East fine of said Northwest Quarter of the Northeast Quarter; thence Southerly along said East line to the point of beginning. Subject to that part thereof taken for highway purposes by the State of Minnesota and fled for record. Ramsey County, Minnesota Abstract Property Parcel 2; The Southwest Quarter of the Northeast Quarter of Section 34, Township 30, Range 23 West, a cept part taken for Josephine HMIs No. 3, and Is'cept that part which lies Southerly and Easterly of a line described as follows: Beginning at the most Northerly corner of Lot 1, Block 12, Josephine Hill. No. 3, thence North 61 degrees 12 mi nute. 00 s ands East, 30 feet; thence North 03 degrees, 04 minute. 20 s ands West, 84.83 feet; thence North 75 degrees 49 m nutes 18 s ands East 659.72 feet, or less, to the East line of said SouthwestQuarterof the Northeast Quarter, and there terminating Subject to that part thereof taken far highway purposes by the State of Minnesota and filed of record. Tarrens Property Tarrens Certifcate No. 598428 TITLE COMMITMENT This s rvey was prepared without the benefit of c ent title work. Easements, appurtenances, and anumbrances may exlet n addition to those shown hereon. This survey is subject to revision upon receipt of a currenttitle insurance commitment or attorney'. title opinion. GENERAL NOTES 1.) Survey coordinate basis: Ramsey County Coordinate System 2.) East right-of-way line of State Trunk Highway 51 established using alignment provided by Minnesota Department of Transportation. 3.) At the time fieldwork w s performed for this s rvey, there w significant a unt of sn n the ground. Physical feature. r s were located to the .best of o ability, but there may be additional features that were not visibleand, therefore, not shown hereon. 4.) Bearings and/or dimensions listed within brackets are per plot or record documents. 5.) Wetlands shown hereon a e per a oft -site determination on the Figure 6 Exhibit as indicated in a wetland report prepared by Pinnacle Engineering on January 24, 2020. 6.) There were n. wetland delineation markers observed in the process of conducting the feldw.rk. UTILITY NOTES 1.) Utility inf.—H., from plans and markings w ve . ombi,ed with obserd evidence of utilities to develop a vlof the underground utilities shownreo hen. However, lacking a va lion, the a act tali., ofu nderg ...d features . rot be a urately, completely and reliably dad epicted. In dition, Gopher State One Call locate requests from sa rveyars may be ignored a suit in omplete response. Where additional o e detailed information is required, excavation and/or lac private utility locate request may be eoessary. 2.) Other underground utilities of which we are unaware may exist. Verify all utilities critical to construction or design. 3.) Some .nderg r.. nd utility locations o shown as marked —its by those utility companies whose I...tare responded to our Gopher State One Coll, ticket numbers 200090758 and 200090762. 4.) Contact GOPHER STATE ONE CALL at 651-454-0002 (800-252-1166) for precise oneits location of utilities prior to any excavation. ZONING NOTES 1.) Zoning information obtained from the City of Arden Hills web site on February 5th, 2020. The subject property is zoned: B-2- General Business District Proposed zoning: ?????? 2.) The setbacks for zone B-2 are. Building: Front yard = 20 feet Side yard Interior (Principle) = 10-20 feet (Minimum total both yards on Lot) Side yard Interior (Accessory) =10 feet Side yard Corner = 20 feet Rear yard = 20 feet (Principle) Rear yard = 10 feet (Accessory) Lot Coverage by Structure: 45% Height : 50 feet Min. londscdap. Lot area: 20% 3.) We have shown the current zoning cl ass if cation of the property. building setback requirements and other Lot rbq.ir.m.rt.0 as at forth In that alassifaation based on our own research. xN07E- Minimum setback requirements are established by current ordinances. The location of setback lines is subject to legal interpretatian and planning a ..iderations. therefore setback he or. ot shown. Specific questions regarding setback requirements should be directed to the regulating authority. AREAS Lot = 278,757 square feet or 6.399 ac Lot 2 = 161,282 square feet or 3.703 a Lot 3 - 1, 392, 319 square feet or 31.963 ar s fee, Total = 1,884,438 square feet or 43.261 acres OWNER DEVELOPER: CIVIL ENGINEER: Bethel University BKBM 3900 Bethel Drive 6120 Earle Brown Drive, Suite 700 St. Paul, MN Minneapolis, MN 55430 Contact person: Glenn Hofer Contact person: Joel W. Maier P.E. Phone: (651)-638-6069 Phan e:(763)843-0420 ARCHITECT/DESIGNER: BUETOW 2 Architects, Inc. SURVEYOR: Sur& Lond Surveying, LTC 2905 Dean Parkway, Suite A 9001 E. Bloomington Freeway, Suite IIS Minneapolis, MN 55416 Bloomington, MN 55420 Contact person: Contact person: Airs, J. Carlson Phone: (612)-455-2626 Phone: (952)-881-2455 hereby certify that this survey, elan, o report was prepared by m under my direct supervision and that a a duly Licensed Land Surveyor under the laws of the State of Minnesota. Dated this 5th day of February, 2020 SONDE LAND SURVEYING, LLC. BY -lee J. Carlson, P.L.S. Minn. Lio. No. 44900 LL Removed proposed-1,fing and park;ng Lot JMD 04/07/202 New Lot Lapul JMD 03/I]/202 e ■ Orvwmq Pw PRELIMINARYPLAT OF.- 2 PINE TREE NORTH SIsrnvEYINa z- ` °.e2� s . LAND SURVI3YlATs ass�ra.:`ee-eee-sszei I � fiIA TE TR NK t ` - - - -_ _ _ I I � -� az �oansrar -- - - WETLAND 6 ------_ - - -- *9 yt„il-•e f ` li t`; 'l i - '`\ `' (/` ( , ' % i '/ WETLAND"5 f'i LO3 T szs0.F / /.33/.963 All S .� W+T \; / I -_ \ tll llil1i 4#I, 11� ,�- • III/ '` ------ - \\ `, ,III c \ / I, w, WETLg\ND'L\" \ — \i LEGEND O Denotes iron man ent set marked with _ _ ----' / �i------_- _ —\ P.L.S. No. 44900 um - \ • Denotes found iron anument marked with /,' R.L.S. 1095. unless otherwise indicated �`` AS Denotes advertisement/informational sign Tti BE Denotes building entrance CB Denotes catch barn CB% Denotes c mu ication box, GRDL Denotes gPound light HCR Denotes disabled ramp HCS Denotes disabled sign 7 HHc Denotes communication hand hole s 't \ . • • __ HVD Denotes fire hydrant INV Denotes structure invert _ -- LA Denotes landscaping �- %' iT— pv.„'",� ",--_ _ _. -- LP Denotes lmgan oele3W'71feY MaM- _ ---- _, MH Denotes h T !]rx --- _-v - (P) Denotes per pion 1 - •' �I ___` PKS Denotes parking sign - PVC Denotes al ylchloride RCP Denotes Pei fin arced c ncrete pipe - SAN Denotes nitary manhole SAN S Denotes sanitary .—rr SMH ST S Denotes storm manhole Denotes storm s STC cu Denotes tap of s untoble c ncrete rb o TC Denotes tap of c crate curb TCS TRANS Denotes traffc control sign Denotes transformer UGC Denotes underground c cation line UGE W Denotes underground electricnline Denotes water line BOX Denotes B—Ider tree COT Denotes Cottonwood tree MPL Denotes Maple tree POP Denotes Papl ar tree SPR Denotes Spruce tree TR Denotes deciduous tree WIL Denotes Willow tree I UNK HWY 5> �,.... \\ h nc� � ���✓ �•�\ \\\ fie= . EXC'EF-TION 7 � # I 1 WETLAND 2 l d szaea\\-6j��.�//% j\` '•� .EP OEP T ON ) trl\ N•l WETLAND �3§ WETLAND 3 \ \ U�\ M-' PARc D a'� I N E ` _-'C \fII___!]v �vi�r�'.mt�Lt�l^er ------------- BENCHMARKS ✓r�i (] (BM1 (NAVD 88) I.) Top of top nut of 2nd fire hydrant north of Harriet Avenue ast side of Pine Tree Drive Elevation = 934.84 feet 2.) Top of top nut of Ist fire hydrant north of Harriet Avenue ast side of Pine Tree Drive Elevation = 929.66 feet 3.) Top of top nut of fire hydrant 60/ ft NW of main building, upper north side of main building Elevation = 927.30 feet A- 6 C 3 A C E L B , -- a 4 ,-"".,_ I I E P A R CE L D N © New Outlot A JMD 04/Ol/2020 Q Removed proposed building and parking Lat JMO 04/Ol/2020 \ New Lot Layout JMD 03/17/2020 Omwm9 Titl PRELIM/NARYPLA T OF.- 2 PINE TREE NORTH jj[SUNDE-1. LAND SUSIMU IT ass �ra.:`esz-eee-sszsi Project88-405-1010m Bk/PA'/009121 Re/ 61l1 IO 0^ msn/a'3o Ran9s'zJ s 05 21of 2 LOT COVERED BY STRUCTURE I SITE PLAN: KEY NOTES: 0 O1 SEE CIVIL PLANS FOR ALL DIMENSIONS AND LOCATION OF BUILDING. (�2 4" WIDE WHITE PARKING STRIPS - TYPICAL. OHANDICAP PARKING SIGNS, 3/A0.1, 4/A0.1 O4 FLAGPOLE -SEE SPECS, 1/A0.1, 2/AO.1 OSEE CIVIL PLANS FOR PAVING. OB SEE CIVIL PLANS FOR STORMWATER MANAGEMENT. O7 MONUMENT SIGN - SEE SPECS. O TRASH ENCLOSURE - SEE SPECS& DTL 1/A71. O GENERATOR -SEE ELECTRICAL 10 ELECTRICAL TRANSFORMER. ii CONCRETE CURB AGAINST BUILDING. 12 HANDICAP RAMP 13 BENCH - SEE SPEC 14 STATUE - SEE SPEC 15 TRAINING TANK FURNISHED BY OWNER'S VENDOR. GC TO INSTALL (4) BOLLARDS SIMILAR TO TYPICAL AND PROVIDE A SLEEVE TO ENTER ROOM 56. VERIFY ENTRY LOCATION WITH OWNER 18 ALTERNATE FOR PAVING - SEE PROJECT MANUAL. 17 SEE SPEC FOR BRICK DESCRIPTION. 18 SEE CIVIL PLANS FOR ALL CONCRETE WALKS INCLUDING JOINTS PATTERN SHOWN HATCHED 19 GC TO PROVIDE 4 BOLLARDS AT GENERATOR ---------------- I I 14 I I I I I I ,z I I , HC3 I HC4 G* I I I I I I (2) SITE PLAN A0.1 1" = 20'-0" 448.00' 11r.0" PINE TREE DRIVE 26'-0 0 M Z Q �2 �0) N a� O N N'a Z Oay a W o0. Z M'N W Nz! N m 29, A E 1= (0 N cu L� C f0 C .4 C (6 V) nL LLI 0= F Y N co JQ 2113 A0.1 SYMBOL LEGEND REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT SECTION \ \ / —i /. 1 . p p'+ \\ I Y y' p, :. • f REMOVE AND DISPOSE OF EXISTING / / /, , / I , }. v •.ti•; •. CONCRETE PAVEMENT SECTION J w m 3 m 9 (I \ -- ------------- 11 1� REMOVE AND DISPOSE OF EXSTING BITUMINOUS PAVEMENT SECTION AND ANY <i I I'T I \/ �_� \ \ REMNANT INFRASTRUCTURE. s � D U1 JW—T -- _ — — _ _ — _ \ REMOVE AND DISPOSE OF ALL UNDERBRUSH, C , 1 ®` �_---__-----�\----_------ _—�.-------_--- I a I ) 11—III—I TREES, STUMPS, AND ROOTS. src z SEA T \—�I I I �• �\ � �/ L a .. — .. �.. .. // . /�----- _\ — a— I �I 1 \\ I / WLL _ _ _ , w\ KEY NOTES IN H �I I II I I III_1111 11=III 411 — _ REMOVE AND DISPOSE OF EXISTING CONCRETE CURB AND e i �,lII—IIII—H—�l�—�=I—II—IIII GUTTER. _oo3v'� IIIII—IIII-I I I—�I I I I � � �' 111—I I I��'I H�—I I I \ _ �' - O REMOVE AND DISPOSE OF EXISTING BITUMINOUS PAVEMENT. 11-1'1 I—I,I I—I:I I-1 I I —III —I \\ / 3 REMOVE AND DISPOSE OF EXISTING CONCRETE PAVEMENT. v -- -- -- , H MI=LI I I� I ICI I I� I I=� 1 I o z ' ' 4 REMOVE AND DISPOSE OF EXISTING TREE AND STUMP. \ I rl I I-1 I I —I H=1TI—III—III I I o z —I, �—I —I I I I 4 (TYP. OF 6) / / ''.:1 I —I I I —I IV —I I I —I I I —I I I —I I \ —I� 1 / I �: OS REMOVE AND RELOCATE EXISTING UNDERGROUND ELECTRIC / I \ LINE AND ASSOCIATED ELECTRICAL BOX. COORDINATE WITH I—hH�l 1111E111—III I ICI I_ I/ UTILITY PROVIDER. H REMOVE AND SALVAGE EXISTING UTILITY POLE. REMOVE AND V / i' / / , I I \\ I I I \ / I / / /=111-11 I —I —I I I —III ) �I I I^I ) / '•' \ I O DISPOSE OF EXISTING FOOTING AND ANY RELATED W INFRASTRUCTURE. COORDINATE WITH ELECTRICAL. L REMOVE AND DISPOSE OF EXISTING STORM CULVERT AND T LU / / � �� s��, \ \\ I / / / � , � \ � \ / /� Ih �• FLARED END SECTIONS. F 2 v REMOVE AND DISPOSE OF EXISTING UTILITY LINE IF THE LINE IS DEAD. IF THE UTILITY LINE IS LIVE, COORDINATE RELOCATION Q 8'--_ —.%�% ^ !\` \ \� 3z�l WITH UTILITY PROVIDER. O \\\/��7 REMOVE AND DISPOSE OF EXISTING LIGHTS AND ANY REMNANT N aZ / / / ' �/-' I } / 'Z••% AJb' — — _ _ V \ \ \ 'TO \/ INFRASTRUCTURE. g z �ry�,✓�^ •c� 1 34— ////��\ REMOVE AND DISPOSE EXISTING MONUMENT SIGN AND ANY a \ \ \ \ O REMNANT INFRASTRUCTURE. C a N \ _ 0 2 \ ` MCI �\ \� \ \ \ y .� \ /°\ / \ \\ \ \ 4 _ 11 REMOVE AND DISPOSE OF SIGN AND POST AND ANY REMNANT W W Q INFRASTRUCTURE. w a (TVP—OFs) �\ \ ��\ \ \` .nz \ / I 12 REMOVE AND SALVAGE EXISTING SIGN. REMOVE AND DISPOSE m ry 4 // / _ i — _ I ` ,(` \ )• / / 4 OF EXISTING POST AND ANY RELATED INFRASTRUCTURE. (TVPOF S)'/\\\ a DEMOLITION NOTES M I I I I II (r�l \\ \\� \\ \� / / /-(�//`' /� \ iii.•i.ti.•idi.•i.'i. W LJ 8 / I\ III I :'."."•"•"�."•"•"• 1 I. Verify all existing utility locations. i (TYPjOF 2) �� \ I I a }'• 2 •;.•;.• 2. It is the responsibility of the Contractor to perform or coordinate all D I I� I I I X�•' / •\ — — — — % �' , I / :•'•;�;•}'•;;;;•};;;•;;;;;; ;•;;:p; -�uHu necessary utility demolitions and relocations from existing utility locations / 10 m'•1'•;;•; i;•;;•;'•;;•;;•, to all onsite amenities and buildings. These connections include, but are — — — _ _ _ _ _ ,�'' I ^•.,}•::.1•:::::::::, not limited to, water, sanitary sewer, cable tv, telephone, gas, electric, site v 6 lighting, etc. flt D ,� IIII I I III + I t,,.J•� v ---/ V� (TYP. OF 2) 4 \ 112 2 3. Prior to beginning work, contact Gopher State Onecall (651-454-0002) to 0 ,4 m locate utilities throughout the area under construction. The Contractor shall retain the services of a private utility locator to locate the private / T- I / a ,T/ '. z •'P� utilities. rc 4. Sawcut along edges of pavements, sidewalks, and curbs to remain. w N z 0 N \ \ I\ \ I I I I •wf \ \ / / — — — _ —'' -- �j� ^_rq F I \\ \ / \ \ 5. All construction shall be performed in accordance with state and local w standard specifications for construction. z z I III II II \\ A _ i s2a--- --- - 2 -, sec a --------- �wP _ W I\ #p II II \\ \• _-- -, 6 I I —III —I 11=1 I I IIII I t r -s,,, I g a mP.OF6) -—III�II—II1�l1—Ill xo,oPQx �:4 . -<-1IMI 11-1 I I-1 I1/'sI I —I I I I 'Itl _ 2022 _=1l l=1 11=1 I I—IIII 11—I I MI I I_ I ,/ I —I I I 11— � I 1=1 I I� I I —I I I� I I >` , \ \I'I i 11 1 I 1-111= 11-�-1t1=1 H—H� 11=I I I=11 I a \/ ill ,4 I '-o H=1 H— H =H1=1 11=1 I I-1 I I-1 I I-1 I a III _ a (TYP OF 6) 11-111�1 III I I—IT_I�11—t11�'I 1-111�11 1 Z 6PD 111—H� III=�I1=H—111E111-111=111E111-11Y I . `(D IIII A E I-I=l i I� IlJ 1=1 I I� I ICI I I�JJ= V I I NV r ,, � I I Y I �_ _ _ � —III—I I —III—III—H I— —III—I 11-11 I-1I1—I 1 I-1 I 1—I 1 I a I � 1 \ ` /1 ' - 6 =t 11� I I —I H 11— 1-1 11� I I-11 I —I 11—I 11� I I I I �CL , r1=1 1=1t 1=1t1-111= / 00 (xuR [D UxDER sxox) _ c 02 �\__— \\\\\\\\ \ / \j I\I 11 � I I � / /1• I I II �I 11 N N WETLAND 3 IIII 1 I / ICI �-2 INCIDENTAL WETLAND PERd RCWD REVIEW FILE 20-010RI I I 1922 NORTH DEMOLITION PLAN 0 15 30 60 /+ •,�•��•ror�,�"s,ax I mmc 1 •md�3� P�•�d,.e A 1 v / / / / /� / ,�,— A I A \ \I I I / \V C1 00 u i L . - C� — — — — — — — — — — — — — — — — — — — — LQ Z W 3 3 I I v I. - PROPOSED FIRE STATION I FIFE: 930.00 (ARCH: 100'-0") e .< II �zJ. 4 II .. 8 . II I II . ° °4 ad II Y III ° °Ea II I II ICI � 8 I 2 I II � z I N. f 2 I 2 2 � I _ � Y r� 0 I WETLAND 3 � INCIDENTAL WETLAND PER - \ RCWD REVIEW FILE 20-01OR I I T SYMBOLLEGEND MATCH EXISTING BITUMINOUS PAVEMENT SECTION NEW LIGHT -DUN CONCRETE PAVEMENT SEE DETAIL 1/C500 NEW HEAVY-DUTY CONCRETETE PAV PAVEMENT SEE DETAIL 2/C500 NEW CONCRETERETE OR ORBIT. (ALT #1) PAVEMENT SEE DETAIL 1/C500 OR 3/C500 (ALT #1) NEW CONCRETE ORBIBIT. (ALT #1) PAVEMENT SEE DETAIL 2/C500 OR 4/C500 (ALT #1) NEW STOOP/APRON SEE STRUCTURAL KEY NOTES O1 NEW B612 CONCRETE CURB, SEE DETAIL 5/C500 ONEW SURMOUNTABLE CONCRETE CURB, SEE DETAIL 6/C500 OMATCH EXISTING CURB AND GUTTER O INSTALL NEW SIGN AND NEW POST, SEE DETAIL 9/C500 _A: ADA PARKING _B: NO PARKING ACCESS AISLE _C: STOP _D: DO NOT ENTER, FIRE TRUCKS ONLY O NEW FLAG POLE, SEE DETAIL 8/C500 O NEW ADA RAMP, SEE DETAIL 10/C500 _A: TYPE 1 _B: TYPE 2 _C: TYPE 3 O NEW CONCRETE VALLEY GUTTER AND APRON, SEE DETAIL 7/C500 O NEW BOLLARD, SEE DETAIL 11/C501 O SEE ELECTRICAL. 10 SEE MECHANICAL. 11 INSTALL SALVAGED SIGN AND NEW POST, SEE DETAIL 9/C500 PAVING NOTES 1. Concrete joints are shown for general reference only to signify new light -duty and/or heavy-duty concrete pavement. Actual joints shall be constructed per the project specifications. 0 NORTH 0 15 30 60 = sa •yrcmov� CnmW°e€ W g3M 1 o'oS�V S Z M _ ,F m V W IH = LU �yN Q~ O N Naz Ix pzo G W oZ oZ N M 1 2022 1 A c N C 0 0 N � N C C f0 C C f0 N 02 Y N J Q 1922 PAVING PLAN C200 ---- \ - -\ \\-------------��s // LEGEND i --- m --950 --- EXISTING CONTOURS rn8 1 \ /� NON z / - - - - - - - s 950 PRO POSED CONTOURS -MAJOR INTERVAL 950.00 TC SPOT ABBREVIATIONS `=v NS: a TC-TOP OF CURB 949 PROPOSED CONTOURS - MINOR INTERVAL 949.50 GL GL-GUTTER LINE N =mF, - - - - - - - - - - - GRADE BREAK LINE GOGUTTEROUT \ \ / -� / 1 GRADE SLOPE B- BITUMINOUS C- CONCRETE _ \ �_ __--- J SILT FENCE _ \ \ \ RIP RAP /ROCK CONST ENTRANCE _ _ _ _ EO EMERGENCY OVERFLOW 0 \/ \ s TW-TOTTOMP OF OF ------ _____--------------- - \'�° � BW-BOTTOM OF WALL (FIG) EXISTING TO BE VERIFIEDway INLET PROTECTION, __-- \-- a // \�� I � �-----__----�-_------_---�\-__--- SEE DETAIL 5/C501 p�rc EROSION CONTROL BLANKET, `- _ _ J CONCRETE WASHOUT STATION w �------ -------- -- ---_ \ .1 T' (TO BE DETERMINED ON -SITE) 3aaa _ \\ \ I 9 }---_--------- _� I SEE DETAIL 7/C501 �s�� 928 \ */ ,�----------\ I ,930.27 C` 929.66 GL' ' / a T /929.07G0 sao.11c C i -WI GRADING NOTESoaN 928.93 TC / , 929.96 GO \ 2 .2 T \^ I \ 928.43 GO i \ , \ / w ff / 928.79 G I ,* r 1. Tree protection consisting of snow fence or safety fence installed at the drip line shall be in place prior to beginning any e 2 .4 T 929.55 GL/TC grading or demolition work at the site. 927,95GL i / I/ 928.93 GL \ 1 s \ \ \ \Ul I \ I I .50 GL/TC _ M w S \ I I 1 \ I p 1 T � � _ - / ai 2 - 2. All elevations with an asterisk (`) shall be field verifed. If elevations vary significantly, notify the Engineer forfurlher I- - a 930.13 TC h instructions. 927.69 GL Nry \ � `'s / / I \ A`ti 928.87 TC \ 929.63 GL , ± \ \ 929.96 TC / 928.76 GL?C V 927.72 TC - - _ I / \� 928.37 RIM \ INLET PROTECTION ~ 5 3. Grades shown in paved areas represent finish elevation. « '< <ST 929.46 GL « <� 929.33 TC < \ 929.71 TC i TYP. P P 1 \ \ \ \ \ \ 927.42 GL - - - ( 928.83 GL 929.21 GL (TYP.) C501 Z INLET FHOTECTION - - 928.31 GO a 29.07 C` 4. Restore all disturbed areas, see Landscape Plan. C501 (TYP') - / 930.00 FFE 2 I 929.10 GL/TC / \ - 9.15 C \ 5. All construction shall be performed in accordance with state and local standard specifications for construction. \ I / / 928.50 GL I I v% 928.97 TC / r 928.28 TC 929.30 TC \ 928.92 TC / 928.97 GLCTC F 928.50 GO .. 2 / _ \ / - 927.78GL P 928.80G0 \ \ 2 O 928.98Go / 929.29TC` / EROSION CONTROL NOTES V ( / ,' I , 928.79 GL` ./ W ! g27,s- 930.00 FFE \ .� 929.11 C 4 929.10 TC LJ " / 928.60 GO I 2 .1. w 1. Owner and Contractor shall obtain MPCA-NPDES permit. Contractor shall be responsible for all fees pertaining to this permit. The r_ \ 28.49 GUTC / 929.22 C I \ \ SWPPP shall be kept onsite at all times. \\ 928.02T / / I \ I X Lit \ 928.52 GL / / Wv �\ p mm o 2. Install temporary erosion control measures (inlet protection, silt fence, and rock construction entrances) prior to beginning any F N �'92excavation or demolition work at the site. j 929.93 TC N 929.43 GO \ \ \ \ Q \ - - 929.76 T 2 .47 C \mmP \ 3. Erosion control measures shown on the erosion control plan are the absolute minimum. The contractor shall install temporary earth Q H / \ \ \ \ 929.26 GO �/» \ dikes, sediment traps or basins, additional siltation fencing, and/or disk the soil parallel to the contours as deemed necessary to further y 29, .77 T - - \\ \ \ \ \ \ 929.59 GO 1 control erosion. All changes shall be recorded in the SWPPP. > w 92.27 GO- _ '� \ \ \ 2 . T \ \ / g N QZ 928.25 GL A _ , \ \ \ \ \ 929.10 GO 4. All construction site entrances shall be surfaced with crushed rock across the entire width of the entrance and from the entrance to a 928.90 GO 9.S C \ \ 930.00 GL 930.07 TC 2 . T I g28.20 GL* �' point 50' into the construction zone. 1 929.57 GL 929.18 GL Q r/1 929.24 GO - \ \ \ - O a 7 / \ / `�-/�\ 5. The toe of the silt fence shall be trenched in a minimum of 6'. The trench backfill shall be compacted with a vibratory plate compactor. r = O 930.00 FFE _ m _ _ 928.07 GL` - 6. All grading operations shall be conducted in a manner to minimize the potential for site erosion. Sediment control practices must be W p w 9 y 929.75 GL \ \ \\ \ \ \ \ \ established on all down gradient perimeters before any up gradient land disturbing activities begin. ' w Z 928.41 GL/TC MM o Z \ 1 / ) � 7. All exposed soil areas must be stabilized as soon as possible to limit soil erosion but in no rase later than 14 days after the construction INLET PROTECTION \\ / / / activity in that portion of the site has temporarily or permanently ceased. Temporary stockpiles without significant silt, clay or organic Y / 928.34 GO -- - +� ) / / / / - Y 928.52 GL/TC c aggregate pi stockpiles, stockpiles) an components / (TYP.) \ ,-- - 930.14 TC / / / aa, components (e.g., clean a to stockpiles, demolition concrete stoc les, sand stock files d the constructed base coo is < « I / / / 928.40 GO \ I `G of roads, parking lots and similar surfaces are exem t from this requirement. �\ .\ 929.84 GL / / / / \ N P 9 P qui I \ / I / < / II 927.82 TC ` / / 929.00 GL / \�927.52 GL ;\\ 2 / 1 T /,,11 8. The normal wetted perimeter of any temporary or permanent drainage ditch or Swale that drains water from any portion of the 928.41 GL / / PROP ED f IR S/T iION I / construction site, or diverts water around the site, must be stabilized within 200 lineal feet from the property edge, or from the point of F, '0 \ I I 1 discharge into any surface water. Stabilization of the last 200 lineal feet must be completed within 24 hours after connecting to a FFFx 30"00 lARCH(100'-0") I �\ g portions of any temporary or permanent ditches or swales must be complete within 14 S surface water. Stabilization of the remaining RIP RAP ATFFE", o 'I C501 OUTLET P. \ \� _ cc snH (N days after connecting to a surface water and construction in that portion of the ditch has temporarily or permanently ceased. 9. Pipe outlets must be provided with energy dissipation within 24 hours of connection to surface water. 930.00 FIFE 10. All riprap shall be installed with a filter material or soil separation fabric and comply with the Minnesota Department of Transportation '4 I I III \ g2g_g2 TC o° do 00o ROCK CONSTRUCTION 1 Standard Specifications. T I I I 927.72 GL - - \\ o°o°o°� o ENTRANCE (TYP.) C501 11. All storm sewers discharging into wetlands or water bodies shall outlet at or below the normal water level of the respective wetland or in N _ m m / I I Y y---- ----- 930.00 FIFE \ / water body at an elevation where the downstream slope is 1 percent or Flatter. The normal water level shall be the invert elevation of / I 930.00 FIFE 27. 1 T 82741 GL \\ the outlet of the wetland or water body. -2=� - - - - - - - /27 2 I \ I \\ \ 9z7.08 GL/TC 12. All storm sewer catch basins not needed for site drainage during construction shall be covered to prevent mnoff from entering the storm w 2 2 - - _ / I I \ \ sewer system. Catch basins necessary for site drainage during construction shall be provided with inlet protection. o 930.00 FFE 1 2 . / 1 I 13. In areas where concentrated flows occur h as swales and areas in front of storm catch basins and intakes the erosion control o I \ INLET PROTECTION (TYP.) w a �S 1 I (such ) J 1 I \ \ ( ) 1 / -- - - - - - - - / / facilities shall be backed by stabilization structure to protect those facilities from the concentrated Flows. Z Q I 11 ,Y927.00 GL?C 14. Inspect the construction site once every seven days during active construction and within 24 hours after a rainfall event greater than 0.5 BID ROLL TYP. Q I / inches n 24 hours All inspections shall be recorded n the SWPPP LJ \ # C501 II -_--i No FIFE I I FIFE 927.14 TC* a 15. All BMPs must be repaired, replaced, or supplemented when they become nonfunctional or the sediment reaches 113 of the capacity. 926.64 GL` These repairs must be made within 24 hours of discovery, or as soon as field conditions allow access. All repaire shall be recorded in \ I I I I I INLET PROTECTION e �ry ryN 926.72 C / the SWPPP. 2022 (TYP.) „� I I C501 y / I 16. If sediment escapes the construction site, off -site accumulations of sediment must be removed me manner and at a frequency \ II 92ss4 cC /\I` °'� - _- „ \\ / sufficient to minimize off -site impacts. RIP RAP AT OUTLET, EXTEND \ SILT FENCE (TYP.) I / - \ - - 17. All soils tracked onto pavement shall be removed daily. RIP -RAP TO CURB AT THE 929.00 GL - - - C501 SIDES OF RAIN GUARDIAN A I 9 18. All filtration areas must be inspected to ensure that no sediment from ongoing construction activity is reaching the filtration area and .1 T TC 929.00 GL o I - - I �I these areas are protected from compaction due to construction equipment driving. \ I 928 9�GL � 929.80 GL 929.38 GL � ill BID ROLL (TVP.) 2 � _ 927 C501 19. Temporary soil stockpiles must have silt fence or other effective sediment controls, and cannot be laced in surface waters, including 926 1 P rY P P 9 RIP RAP AT OUTLET, EXTEND g 924 9 3 9 V a stormwater conveyances such as curb and gutter systems, or conduits and ditches unless there is a bypass in place for the stormwater. RIP-RAP TO CURB AT THE z? 923 --- ----- INLET PROTECTION 5 \ I \ 1 / 1 3 C501 SIDES OF RAIN GUARDIAN 923 ryp RIP RAP AT e E \IV 924 -' (TYP.) C501 1 20. Collected sediment, asphalt and concrete millings, floating debris, paper, plastic, fabric, construction and demolition debris and other I OUTLET C501 / _ - - _ _ _ 925 1 / I wastes must be disposed of properly and must comply with MPCA disposal requirements. Q 924 I _ I 21. Oil, gasoline, paint and any hazardous substances must be properly stored, including secondary containment, to prevent spills, leaks or 925.00 G / other discharge. Restricted access to storage areas must be provided to I g g p prevent vandalism. Storage and disposal of hazardous waste 00 I \ I\ must be in compliance with MPCA regulations. \ I SILT FENCE (TYP.) - - - - - - - - - ` / / \\,,----�� // RIP RAP AT SILT FENCE (TYPI) \ 22. External washing of trucks and other construction vehicles must be limited to a defined area of the site. Runoff must be contained and I.L ro-re C501 - 61 FILTRATI NBA IN #1 RIP RAP AT OVERFLOW (TYP.) C503 I I I, C501 \ waste properly disposed of. No engine degreasing is allowed onsite. UrvDER \ no - - - - - - - - _ - - BASIN BTM: 922.00 OUTLET TYP. 1 / \ (su slEo ea srvovp 2 RIP RAP AT _--- ----- eg OUTLET(TYP.) C501 I r� a OUTLET: 923.70 \ \ L 23. All liquid and solid wastes generated b concrete washout operations must be contained in a leak -proof containment facility or p C503 OVERFLOW (TYP.) C501 a, / I I I ,�' \ q 9 Y P P h 100-NEAR HWL: 924.84 g impermeable liner. A compacted clay liner that does not allow washout liquids to enter ground water is considered an impermeable N I / liner. The liquid and solid wastes must not contact the ground, and there must not be runoff from the concrete washout operations or L areas. Liquid and solid wastes must be disposed of properly and in compliance with MPCA regulations. A sign must be installed O = adjacent to each washout facility to inform concrete equipment operators to utilize theporoper facilities. C WETLAND 3 24. Upon completion of the project and stabilization of all graded areas, all temporary erosion control1 'a INCIDENTAL WETLAND PERT II II I facilities (silt fences, hay bales, etc.) shall be removed from the site. J Q RCWD REVIEW FILE 20-010RI 1 I - - �2r , / III 1 25. All t sedimentation basins must be restored to their design condition immediate) \ \ I I � permanent se amen tin can y .1 p \ I I I I following stabilization of the site. 1 922 \ \ \ \ \\ \ I I I __--90' //� .III I 26. Contractor shall submit Notice of Termination for MPCA-NPDES permit within 30 days after NORTH GRADING AND Final Stabilization. EROSION CONTROL PLAN 0 15 30 60 D UTILITY - == ENT I i I � I /y I x i i / 11 II 1 D z m D D C� V) m m Et DZ C 0 Z J z --- I Q F- LU � --- W � 3 I U li II II I I I I 1 1 I 1 I I I I I I � I I ) I � I / I i _.L._._ I a I sm - - - - - _ _ - - - - _----- -------------Ti -II I F1 .. - .. ° W HYDRANT o 2 1 6" GV W/ BOX C5o2 C502 8" X 8" TEE CBMH-3 8 8" DIP WM C502 STMH-2 E RIM: 928.64 C5 INV: 924.27 III RIM: 927.42 C501 I -I I--I-I-I INV: 922.91« " CC 45° BEND( C502 272 LF 12" PVC (SCH. 40) @ 0.50% C502 45° BEN D (( " _ 4°DT r 14 LF 1 i�� � RCP @ 0.50% C502 145°BEND I I I _ I I _ Y I 152 LF 15" o. I RCP @ 0.50%� Y 45° BEND RIM: 928.44 INV: 924.34 a 2 O_ op C502 6" X 8"TEE COORD. W/MECH. 6" FIRE SERVICE 6" GV W/ BOX BRING 12" ABOVE FEE PROVIDE BLIND FLANGE COORD. W/ MECH. INV: 922.00 10" RD. COORD. W/ MECH. INV: 925.00 3" CU DOM. SERVICE �I-I -I I CBMH-4 ' _ z I RIM: 927.52 tY 8 INV (E): 923.80 90° LONG SWEEP 2 3' X 8"TEE C501 INV (N/S): 922.15 rsm 3" GV W/ BOX SUMP: 918.15 I 1 29 LF 18" RCP @ 0.5081 �� 11 90° LONG SWEEP All 120 LF 10- PVC (SCH. 40) @ 1100 % COORD W/ MECH q FES-1 ^ // C501 INV: 922.00� INV:923.3 it C502 g _ PROPOSED FIRE STATION CO, TYP 3 FFE: 930.00 (ARCH: 100'-0") DT INV: 920.67 B o I 8 2 _ C502 C502 � - 8 6"HYDRANT 6" GV W/ BOX 8"X6"TEE I p s s - � I Y III I s s 45° BEND C502 Y 6"HYDRANT 6" GV W/ BO; 8'X6"TEE 8"X8"TEE a 3 I N C502 I 8"DIP WM WET -TAP EXISTING WM 8" GV W/BOX �) _ I 100 LP g• C602 ) C502 PVC (sC-I) H. 40) @ 1.975. ) ) 01 92 LF8"PVC (SCH. 40) @ 0.40% CONNECT TO EXISTING SMH-1 18' RCP INV: 922.48' SANITARY MANHOLE 3 y 5 RIM: 928.00 8"PVC TOP: 921.86 INV: 920.86' IN (W):921.33 o _ C502 INV (E): 921.23 l �o'�' ml C503 C502 CO, P DT INV: 9 67 mg» 45' BEND I I 7L 10" RD. COORD. IhiI W/MECH. STMH-6 INV: 925.00 C501 RIM: 926.90 � 6 \/ C502 INV: 923.66 SUMP: 920.66 I �^ C502 27 LF 10" PVC (SCH. 40) @ 1.00% I RAIN GUARDIAN-1 45' BEND / 8" DIP WM Y 8 RIM: 927.38 6 INV: ,26.38 45° BEND I -I -I -I I C502 4" III Y I I 6 I I 6GV W BOX S C502 C502 8" fi"T OUTLET-7 STMH-5 RCP @ 1 00°0 RIM: 92S INV: 924.73 C501 10 8 RIM: 923.70 ` I� C501 C501 INV: 919.50 , CO, TYP 1 C. m m Y DT INV: 920.02 DT INV: 920.67 C509 @ LF 18%C503 DT INV: 920.67 I 1 " RCP @ 2.08% DT INV: 919.97 . - . .. - .. .. .. - - - ' ' - DT INV: 919.85 DT INV: 919.91 ..ES-3 - ; .. - DT INV: 919.5 C501 INV: 919.00' / o0 >x I WETLAND 3 / INCIDENTAL WETLAND PER I C RCWD REVIEW FILE 20-01OR J O I r� 1 II III I c�_ 9 I RAIN GUARDIAN-2xo. RIM: 926.69 6 INV: 925.69 C502 ii W 9 i CO, TYP DT INV: 920.67 C503 4 I INV 923.53 C501 DT INV: 920.26 DT INV: 920.17 V*DT-INV: 920.07 -� a I a I I � I LEGEND O STORM MANHOLE CTV CABLE UNDERGROUND LINE OE ELECTRIC OVERHEAD LINE O CATCH BASIN UE ELECTRIC UNDERGROUND LINE E3 CURB INLET FO FIBER OPTIC UNDERGROUND LINE - GAS - GAS - NATURAL GAS UNDERGROUND LINE ® FLARED END -> >- SANITARY SEWER PIPE O SANITARY MANHOLE >> STORM SEWER PIPE - T T- TELEPHONE UNDERGROUND LINE HYDRANT -I -I -I- WATERMAIN PIPE N GATE VALVE 8 BOX -» DT- DRAINTILE PIPE ® WATERSHUTOFF PIPE INSULATION o-0 LIGHT POLE UTILITY NOTES 1. It is the responsibility of the contractor to perform or coordinate all necessary utility connections and relocations from existing utility locations to the proposed building, as well as to all onsite amenities. These connections include but are not limited to water, sanitary sewer, cable N, telephone, gas, electric, site lighting, etc. 2. All service connections shall be performed in accordance with state and local standard specifications for construction. Utility connections (sanitary sewer, watermain, and storm sewer) may require a permit from the City. 3. The contractor shall verify the elevations at proposed connections to existing utilities prior to any demolition or excavation. 4. The contractor shall notify all appropriate engineering departments and utility companies 72 hours prior to construction. All necessary precautions shall be made to avoid damage to existing utilities. 5. Storm sewer requires testing in accordance with Minnesota plumbing code 4714.1109 where located within 10 feet of waterlines or the building. 6. Connect sand subbase draintile to adjacent catch basins or daylight. Provide solid PVC Schedule 40 piping when crossing waterlines. 7. All RCP pipe shown on the plans shall be MN/DOT class 5. 8. Maintain a minimum of 7 %' of cover over all water lines and sanitary sewer lines. Where 7 W of cover is not provided, install 2" rigid polystyrene insulation (MN/DOT 3760) with a thermal resistance of at least 5 and a compressive strength of at least 25 psi. Insulation shall be 8' wide, centered over pipe with 6" sand cushion between pipe and insulation. Where depth is less than use 4" of insulation. 9. Install water lines 12" above sewers. Where the sewer is less than 12" below the water line (or above), install sewer piping of materials approved for inside building use for 10 feet on each side of the crossing. 10. All watermain piping shall be class 52 ductile iron pipe unless noted otherwise. 11. See Project Specifications for bedding requirements. 12. Pressure test and disinfect all new watermains in accordance with state and local requirements. 13. Sanitary sewer piping shall be PVC, SDR-35 for depths less than 12% PVC SDR-26 for depths between 12' and 26', and class 52 D.I.P. for depths of 26' or more. 0 NORTH 0 15 30 60 yrcmov� y;a �nmWr� W g3m� r _oo3�V S 1 2022 1 A■ UTILITY PLAN C400 12" / NEW 5" PORTLAND CEMENT CONCRETE NEW 6' BASE AGGREGATE 9 jil NEW 12" SAND 1 lill " . ll� 11 1 1� . 1� SUBBASE ORAINTILE, SEE UTILITY PLAN SOIL SEPARATION FABRIC APPROVED SUBGRADE SOIL LIGHT -DUTY CONCRETE CONSTRUCTION DETAIL C500 NOT TO SCALE Y," SAWED JOINTS FILLED WITH ELASTOMERIC JOINT SEALANT NEW 8" PORTLAND CEMENT CONCRETE `#4 EPDXY COATED O O O O O O O O REBAR @ 16" O.C. BOTH DIRECTIONS NEW 6 BASE AGGREGATE NEW 12' SAND ................................................................... ...................................................................... 14. SUBBASE DRAINTILE, SEE UPROVED SUBGRADE SOIL TILITY PLAN SOIL SEPARATION FABRIC APHEAVY-DUTY CONCRETE 2 CONSTRUCTION DETAIL CSOO NOT TO SCALE NEW 3.5" BITUMINOUS PAVEMENT (GRADE B OIL) PLACED IN 2 LIFTS - - - - - - - - - —NEW B'BASE AGGREGATE NEW 12" SAND SUBBASE DRAINTILE, SEE UTILITY PLAN SOIL SEPARATION FABRIC PROVED SUBGRADE APLIGHT-DUTYLBITUMINOUS PAVEMENT SECTION (ALT #1) C5OO NOT TO SCALE NEW 6" BITUMINOUS PAVEMENT (GRADE E OIL) PLACED IN 3 LIFTS U U U U NEW 8" BASE ..................................................................... �...... AGGREGATE NEW 12" SAND SUBBASE DRAINTILE, SEE UTILITY PLAN SOIL SEPARATION FABRIC APPROVED SUBGRADE SOIL HEAVY-DUTY BITUMINOUS a PAVEMENT SECTION (ALT #1) CSOO NOT TO SCALE BACKFILL WITH NEW GOOD QUALITY TOPSOIL AND SEED/SOD SLOPE NEW BITUMINOUS %� PAVEMENT INTERNAL HALYARD FLAGPOLE WITH GLOBE AND INTEGRAL LED moALUMINUM COLLAR o_• oQCK�.o_ oQCK�.o_ -� NEW BASE AGGREGATE APPROVED SUBGRADE SOIL B612 CONCRETE s CURB & GUTTER DETAIL C500 NOT TO SCALE BACKFILL WITH NEW GOOD QUALITY 12' 12' TOPSOIL AND SEED/SOD SLOPE NEW BITUMINOUS 'PER FT. PAVEMENT =1 I III III .• •:.;'.: _..-•::,.. ; .8,. . III III .� IJ�1L= NEW BASE AGGREGATE APPROVED SUBGRADE SOIL SURMOUNTABLE CURB s & GUTTER DETAIL csoo NOT TO SCALE a a A tl°a B ►A PLAN B INTEGRAL CAST EXPANSION JOINT VARIES 18" 18" SLOP #4 EPDXY COATED SECTION A -A REBAR(3TYP) 18" 18" SLOPG PER T H� .o 3 SECTION B-B CONCRETE VALLEY GUTTER �\ WITH BITUMINOUS APRON C500 / NOT TO SCALE 48" FLAG POLE $ FOUNDATION DETAIL C$OD NOT TO SCALE ADA RAMP LANDING ewe ' 2% MAX SLOPE IN Q / ANY DIRECTION 7AD RAMP LANDIN, 2% MAX SLOPE IN ANY DIRECTION NOTES: SIGN POSTS TO BE 18" BEHIND THE BACK OF CURB, UNLESS OTHERWISE DIRECTED. PARKING y SIGN AND POST DETAIL CSOO NOT TO SCALE 0 TYPE ACCESSIBLE RAMP DETAILS �� csoo NOT TO SCALE PE - 3 -off o'o5u S V m zN � y V W N a0 0 NazN g 0 I- z o a WoW z o Z W Nr2 N 1 2022 1 ■IN DETAILS C500 FILTER AREA 5.G5 FT2 OVERFLOW AREA 0.42 FT2 MAXIMUM OVERFLOW RATE (@ 7' HEAD) 1.99 CF5 MAXIMUM OVERFLOW RATE (@ 13' HEAD) 2.79 6F5 BASKET WEIGHT (EMPTY) I LB BASKET WEIGHT (FULL-APPROX.) 45 LES 1--2" WASHED ROCK j GEOTEXTILE FABRIC PLAN 6" MINIMUM 2 BASKETS WITH 400 MICRON FILTER BAGS. TO BE CHECKED PERIODICALLY AND 400 MICRON FILTER CLEANED OUT AFTER EACH RAIN EVENT BAG IN EACH BASKET FITS NEENAH 1642 AND ��ROCK CONSTRUCTION ENTRANCE 1733FRAMESOREQUAL C501 NOT TO SCALE 8" CURLEX SEDIMENT LOGS® WOOD STAKE OR SAND BAG DD STAKE TO ONLY IETRATE NETTING, 'CURLEX MATERIAL 3ROUND NOTES: 1. STAKE OR SAND BAG SPACING SHALL BE 2 FEET O.C. 2 SEDIMENT ROLL DETAIL C501 NOT TO SCALE WIRE MESH REINFORCEMENT HIGH FLOW AREAS ENGINEERING FABRIC METAL, WOOD POST, OR STAKE. 8' MAX. SPACING, 2' INTO GROUND. FABRIC ANCHORAGE TRENCH. BACKFILL WITH TAMPED NATURAL SOIL DIRECTION � OF RUNOFF —III—III—h. NATURAL SOIL PROFILE INFRASAFE INLET PROTECTION �1 DEVICE (OR APPROVED EQ.) C501 NOT TO SCALE NOTE: DEPENDING UPON CONFIGURATION, ATTACH FABRIC TO WIRE MESH WITH HOG RINGS, STEEL POSTS WITH WIRES, OR WOOD POSTS WITH STAPLES. SILT FENCE INSTALLATION DETAIL C501 / NOT TO SCALE %" SMOOTH BAR @ 2" O.C. EACH WAY 6"MAX - I _ I PROVIDE 3 CLIPS TO FASTEN TRASH GUARD TO F.E.S. HOT DIP GALVANIZE AFTER FABRICATION. FLARED END a SECTION DETAIL C501 NOT TO SCALE NOTE: WHEN USING CELL-OSEED DO NOT SEED PREPARED AREA. CELL -O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE RECP, IN A 5' (15 CM) DEEP X 5" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12' (30an) OF RECP's EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE RECP's WITH A ROW OF STAPLESSTAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACK ILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12' (30 CM) PORTION OF RECP's BACK OVER SEED AND COMPACTED SOIL. SECURE RECP's OVER COMPACTED SOIL WITH A ROW OF STAPLESSTAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE RECP's. 3. ROLL THE RECP's (A.) DOWN OR S.) HORIZONTALLY ACROSS THE SLOPE. RECP's WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECP'S MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM , STAPLESISTAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL RECP's MUST BE STAPLED WITH APPROXIMATELY 2"- 5' (5 CM -12.5 CM) OVERLAP DEPENDING 5. CONSECUTIVE RECP's SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (].5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE nN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN e' (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE RECP's. Staples/Anchors: The type of anchors used to secure the blanket to the ground shall be Steel wirel1 Gauge 1' wide x 8" long. �1 EROSION CONTROL BLANKET C501 NOT TO SCALE PRE -MIXED PLANTING MEDIUM: PLAISTED'S RAIN GARDEN PEAT MIX (80% CLEAN CONSTRUCTION SAND, 20% PEAT), OR EQUAL PLANTING MEDIUM SHALL rGRASS BUFFER PROVIDE A MINIMUM I.6"/HR, VERIFY W/SUPPLIER. I STRIP PER PLAN \ VARIES MNDOT NATIVE SEED MIXTURE 33-261 c_+ Oz p ) O p O p 0 Cm O "T O O O O O O p II II II i� O pO pO O O UNDISTURBED AND II II II II 1= 1= = 1= 1= 1= 1= 1= 1= O O O 1= 1= 1= 1= 1= 1= II II FINE FILTER AGGREGATE s w UNCOMPACTED = _ _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - - - - _ _ _ _ _ _ _ _ - - - - - - - - (MNDOT SPEC 3149.2J). FINE II w W s a a INS ITU SOIL - - - - - - - - - - - - - - - _ _ _ _ _ _ _ _ _ _ _ - - - - - - - - - - _ _ _ _ _ _ _ _ _ _ _ FILTER AGGREGATE SHALL �wG PER PLAN PROVIDER MINIMUM 0.8'/HR, VERIFY W/ SUPPLIER. p3u 4' PERFORATED DRAINTILE 2" LAYER OF CHOKER COURSE, #8, #78, OR #89 o'0 5 w B WITHOUT FILTER SOCK. STONE ABOVE THE LAYER OF WASHED #57 STONE (SEE SHEET C400 FOR DRAINTILE LAYOUT) 3" LAYER OF WASHED #57 STONE ABOVE AND ON V N EACH SIDE OF THE DRAINTILE PIPES Z FILTRATION BASIN NOTES: 1. SOILS WITHIN FILTRATION AREAS SHALL BE PROTECTED FROM COMPACTION DUE TO CONSTRUCTION TRAFFIC. AREAS SHALL BE STAKED AND MARKED OFF, WITH ONLY ALLOWED. LOW IMPACT EQUIPMENT (TRACKED OR SIMILAR) N `. Ir♦ 2. PROVIDE AS -BUILT SURVEY TO VERIFY CONSTRUCTED VOLUME. CORRECT NON -COMPLIANT BASINS. j `i i FILTRATION BASIN s CROSS SECTION CSO1 NOT TO SCALE 1" TO OUTSIDE OF MH FROM FLAT BAR (TYP.) " SMOOTH BAR @ 2" O.C. EACH WAY / Y4"x 1Yz" \ FLAT BAR RING %'k 4"z4"CLIPS � Y" SS ANCHOR BOLTS Y"x 1Y" FLAT \ BAR RING PLAN PRECAST INVERT SHOULD BE 112 4 DIAMETER OF PIPE AND BENCHES SLOPED 2" TOWARD INVERT. A O OOUOOOOoO0O0oO A MANHOLE STEPS SHALL BE PLACED THAT OFFSET HOLE IN TOP SLAB VVVVOOlIJJ UoQQOIIJJ IS FACING DOWNSTREAM. FF_- OIIJJ NO BLOCK STRUCTURES ARE ALLOWED OVOV�IJOU��o / OOOoO0O0oO0O0oO WOVEN FILTER GRADE 1" BELOW 10' TRANSITION. 0 Q� O� OnnTg FABRIC MANHOLE FRAME & COVER: lJ VV V V V NEENAH R-1842, TYPE B LID (STMH, SOLID CLOSED, CIRCLE) 1 O��O MN/DOT CLASS III NEENAH R-3501-TB, TYPE L GRATE (CB, SURMOUNTABLE) RIP -RAP NEENAH R-3067, TYPE L GRATE (CB, BARRIER) 4 'UNLESS OTHERWISE NOTED PLAN PLAN MN/DOT CLASS III MINIMUM OF 2, MAXIMUM OF 5 RIP -RAP CONCRETE ADJUSTMENT RINGS WITH FULL O BED OF MORTAR BETWEEN EACH AND A4" COLLAR ON THE OUTSIDE. NO SHIMS OF ANY MATERIAL ALLOWED. INSTALL NEW EXTERNAL CHIMNEY SEAL. 6" PRECAST REINFORCED CONCRETE SLAB. SD 10' MIN. 2' ( ) 2' WOVEN FILTER ' FABRIC SEAL WITH 2 BEADS OF RAM-NEK. SECTION A -A ALL JOINTS IN MANHOLE TO HAVE NOTE: 'O' RING RUBBER GASKETS. FW300 MIRAFI FABRIC OR EQUAL 5" MIN. MANHOLE STEPS, COPOLYMER POLYPROPYLENE RIP AT OUTLETS PLSTIC,112- GRADE 60 STEEL s -RAP REINFORCEIMENT OR EQUAL, 16"O.C. CSO1 NOT TO SCALE m VARIABLE PRECAST CONCRETE SECTION 8' PRECAST SEGMENTAL CONCRETE BLOCK � TO TOP OF THE PIPE SHALL BE USED WITH SIZE AND DEPTH PROHIBIT THE Q O FABRICATION OF PRECAST UNITS. 8"MINIMUM SLAB THICKNESS, 6' MINIMUM DIAMETER PRECAST CONCRETE SLAB, REINFORCED WITH #4 REBAR @ 8- E.W. TGROUT BOTTOM SECTION WATERTIGHT CONNECTION (BOOT/GROUT RING, TYPICAL) CATCH BASIN MANHOLE DETAIL 8 CSO1 NOT TO SCALE 2 EA. /411y" %'SMOOTH BAR @ FLAT BAR 2" O.C. EACH WAY Y4"x 1Y2" FLAT BARRING "x 4"x 4" CLIPS (4) Y' SS ANCHOR BOLTS (4) v`� yB,' SCREEN 48" 6" MIN. ABOVE DOGHOUSETO PRECAST STRUCTURE SECTION BASIN OUTLET 10 SKIMMER STRUCTURE DEAIL CSO1 NOT TO SCALE 6"0 SCH. 40 CONCRETE FILLED STEEL BOLLARD WITH YELLOW LOPE COVER 1 , .1ul NOTE: AT OVERHEAD DOOR LOCATIONS, CONFIRM DOOR OPENINGS. COORDINATE WITH APRON CONSTRUCTION. 11 BOLLARD DETAIL C501 NOT TO SCALE FOOTING a� VLF N a0 O N N 'a z �g� 0 I1 Z 0 a MIN 2 to 0 2 W Nr2 N 1 2022 1 ■IN DETAILS C501 "HYDRAFINOER" HYDRANT MARKER NOZZLE SECTION OPERATING NUT - 1.5" PENTAGON - NUT NO. 5 2 1/2" HOSE CONNECTION (THREAD SIZE 3 1/16" O.D., 7 1/2" T.P.I.) 4 1/2" PUMPER CONNECTION (THREAD SIZE 5 9/16" O.D., 4" T.I.P.) NUT CAP TYPE WITH CHAINS EE EE NOZZLE ARRANGEMENT TWO 2 1/2" NOZZLE n PLUS PUMPER NOZZLE WITH 1.5" PENTAGON - NUT NO. 5 OPERATING NUT NOMINAL GROUND LINE NOTE: 1. 16" BREAKOFF SECTION :1 2. LEFT HAND OPERATING NUT (1 1/2" POINT TO FLAT) 7 /8" 1 PAINT BARREL SECTION YELLOW TO GRADE. 8 %8. 4. DO NOT PLUG DRAIN HOLES. STANDPIPE 5. WRAP IN POLY BELOW GRADE. 6. STAINLESS STEEL BOLTS COR-BLUE. 2 1 4" BOTTOM ;1'/l WROUND HOLES NOTE:HYDRANT LOCATING DEVICES REQUIRED - SEE SPECIFICATIONS. PACER HYDRANT DETAIL -AR�HTfIS MODEL WB-67 L aE xo. P iea� ARDEN HILLS 1 HYDRANT DETAIL CSO2 NOT TO SCALE INSTALL WHEN M.H. IS PLACED OUTSIDE OF THE ROADWAY. NEENAH CASTING R-1733 OR EQUAL. COVER SHALL HAVE TWO CONCEALED PICK HOLES. z CONCRETE ADJUSTING RINGS MINMUM 2 RI INGS MAX MUM 5 RINOS MAXIMUM 12" .I APQEN ,MIS STEPS AS PER SPECIFICATIONS a F� INTEGRAL BASE -INFRASHIELD OR EQUAL EXTEND 4" OVER CONE SECTION DETERMINED BY PIPE SIZE ECCENTRIC CONE BEER GASKETS BETWEEN EACH NT IN MANHOLE SECTIONS. 1' BARREL SECTION BELOW CONE WALLS TO BE CONSTRUCTED OF PRECAST SECTIONS WITH CX4 JOINTS PIPE SHALL BE CUT TO BE 2" INSIDE MANHOLE AT THE PIPES MID POINT AND HAVE A WATER TIGHT SEAL NOTTS: 1. MANHOLES 8' DEEP OR GREATER, THE PRECAST SECTION IMMEDIATELY BELOW THE CONE SECTION SHALL BE 1'-O" (12") IN HEIGHT. 2, PROVIDE STEPS IN ALL MANHOLES OVER 4.5 FEET DEEP. 3. DOGHOUSES SHALL BE GROUTED ON BOTH THE OUTSIDE A INSIDF. 4. PREFORMED INVERIS MUSI HL V2 DIAMETER OF THE PIPE AND BENCHES SLOPED 2" TOWARD THE INVERT. SANITARY STANDARD MANHOLE 4000 ARDEN HILLS a SANITARY MANHOLE DETAIL CSO2 NOT TO SCALE EDGE OF MAT OR BACK OF CURB "HYDRAFINDER" MINIMUM COVER AS REQUIRED IN Qo SPECIFICATIONS OR AS SHOWN ON PLANS. 1 TT1 VALVE WITH } MECHANICAL JOINT TEE AND VALVE BOX 6"-12" ROD EXTENSION GATE VALVE CONE. 6-POLYETHYLENE ADAPTOR SPIDER BLOCK OR EQUAL COVER JOINT BRAL ET WATERMAIN WITH 75" - 1.5" MECHANICAL JOINT 0.75" - 1.5" CONCRETE DRAIN ROCK TEE FOR FIRE DRAIN ROCK BLOCK HYDRANT LEAD AS REQUIRED CONCRETE BLOCK JOINT RESTRAINING COUPLING -TWO 3/4" ALL THREAD RODS STAINLESS STEEL NOTES: I. ALL HYDRANT LEADS SHALL BE RESTRAINED FROM THE MAIN TO THE HYDRANT THROUGH THE USE OF THREADED RODS OR MEGALUGS AS RESTRAINTS IN ACCORDANCE WITH THE STANDARD DETAIL PLATES. 2. VALVE TO HYDRANT AND TEE TO VALVE SHALL BE TIED JOINTS. 3. WRAP ALL DIP 4 FITTINGS IN POLY. 4. CONCRETE BLOCKS TO BE PLACED AGAINST UNDISTURBED GROUND. -A �FIILLS HYDRANT RESTRAINT DETAIL ARDEN HILLS i1 HYDRANT RESTRAINT DETAIL C502 NOT TO SCALE INSTALL ONE LENGTH OF WATERMAIN PIPE WTH THE APPROPRIATE MATERIAL ADAPTORS. CENTER AT CROSSINGS. 24" O.D. 24" PROPOSED SEWER 3" RIGID FOAM COMPACTED SAND INSULATION 'IS" MIN. >:.. .. ...::.. '. 5" MIN. MEGALUGGED BENDS AS REQUIRED PROPOSED WATERMAIN WATERMAIN INSTALLATION UNDER SANITARY OR STORM SEWER CENTER ONE LENGTH TRANSITION TO SPECIFIED OF WATERMAIN AT DEPTH (TYP.) INSTALL CROSSING VERTICAL BEND AS REQUIRE MEGALUGGED BENDS AS REQUIRED PROPOSED WATERMAIN 5" MIN. 3° RIGID FOAM " 5" MIN. INSULATION COMPACTED SAND SEE NOTE PROPOSED SEWER 24" O.D. 24" WATERMAIN INSTALLATION OVER SANITARY OR STORM SEWER NOTES: 1. WHEN WATERMAIN AND SANITARY SEWER CROSSINGS HAVE LESS THAN 18" VERTICAL SEPARATION, INSTALL CROSSING AS SHOWN, 2. WHEN WATERMAIN COVER IS LESS THAN 7.5 FEET, INSTALL WATERMAIN UNDER SANITARY SEWER. BAR 1 �'IlL5 WATERMAIN CROSSING �Ha4o4 ARDEN HILLS s WATERMAIN CROSSING DETAIL C5O2 NOT TO SCALE awair�vn°m vaw¢sasmwsrtewromar¢� - --- y ----- PLAN VIEW NOTES 1. INLETWIDTHANDDISTANCE BETWEENBACKOFCURBAND RAIN GUARDIAN TURRET MAY VARY WITH SITE CONDITIONS. --- --- CONCRETE BASE EXTENDS BEYOND THE FILTER WALL OF 1 SPECIFICATIONS GTEEL REINFORCED, COLD JOINT SECURED MONOLITHIC CON- CRETE STRUCTURE(1,030 LBS). CONCRETE SHALLHAVEAMINIMUM COMPRESSIVE STRENGTH OF 4 SCC PSI AT 2B DAYS. CONCRETE AIR EONTRAIASTNED( T G854%TO-I VOLUME,. MANUFACTURED AND DESGNED M 8 s ®. .... nwsmwrrzeeM ww raa THE RAN GUARD AN TURRET TO SERV - E AS A SPLASH D 581 cwxr¢�e mur \ �M"PMYJxlmFocn raa 2, THREE POINT PICK USING RECESSED LIFTING POCKETS WITH A RD 3?TIC-PIECE LIGHT-0UTY GALVANIZED GRATE(31.5 LIS-1 E)FOR 541 LS CONCENTRATED LOAD OR 30a LBISQ FT UNIFORM LOAD, - INSTALLED VIEVJ3 - 1 O1F1E B°4 �xsuv°I xsm s�xmuxxsH m� 4. TN0-PIECE HEAW-DUTY GALVANIZED GRATE (775 LRSIPIECE) FOR 2BB6 LB CONCENTRATED LOAD OR 1,404 LBISQ FT UNIFORM LOAD. INSTALLATION NOTE8 e PROCTOR). THE DISTPNCEFROM FROM THE BACK OF THE CURB MAY VARY BASED ON SITE CONDITIONS, BUT CONSIDERATIONS SHOULD IN- CLUDE SLOPE OF THE INLET AND BASIN SIDE SLOPES ADJACENT TO THEMINGUARDIANTURRET. P081TION RAIN GUARDIAN TURRET SO PRIMARY OUTLET ALIGNS WITH TOE OF PAS IN SIDE SLOPE TO AVOID SOIL INTERFERENCE WITH REMOVABLE FILTER WALL EXCAVATE, in BELOWTHEGUTTERLNEELEVATON( E. THEBORETENTON OVERFLOW ELEVATION) TO ACCOMMODATE THE 1PONOING DEPTH, S' CLASS 5 AGGREGATE, AND 4" RAIN GUARDIAN TURRET BASE ' w vanw nunmiwiwsErmn wmwure �� I wnvV ie*u / wwue cuxlwew (""'I THEREFORE , THE TOP OF THE ­9 BGOMPACTED TOP OF LIFE RAIN GUARDIAN TURRET METAL GRATE WILL BE 1- ABOVE THE TOP OF THE CONCRETE BASE AND 1-- BELOW THE GITTERLINI THE GUTTER TO THE RAIN GIMRDIAN TURRET. SLOPED NLET FROM 2. THE RAIN GUARDIAN TURRET SHOULD BESET ON THE PREPARED ares.mwc a 3. INS TALL FRAMING FOR INLET BENJEEN RAIN GUARDIAN TURRET �^° ,III II ,III ,III ,III -,III - =,III -,III -,III -,III- vnna.axovrur xml®nw ,III T CROSS-SECTION VIEW NOTES AND eAcI<oFcuaa. TOP ELEVAToxsoFTHEPRAM Nc sxouLU MATGH THE TOP OF THE CURB ON THE STREET SIDE AND THE 0 E RAIN GUARDIAN TURRET ON THE BIORETENTIONSIDE TOP 4, USEE 14510NJOINT MATERIAL BEIIYEEN MIN GUARDIAN TUR- RET AND BIORETENTION INLET 5. SIDE CURBS OF THE POURED INLET MUST HAVE AN INSURMOUNT- ABLEPROEILE SI PREVENT WATERFLOW FROM OVERTOPPINGTHE DOWNSTREAM SIOPROF ENENTHE INLET. -,III III=,III=,III ,IIIIII,III,III,III,III,III=,III=,III= =,III=,III=,III=,III ,III ,III=,III ,III - - - - - - - - 1III,III,III,III,III1 ,III ,III -III ,III '.-,III-,III 1. STANDARD I PRECISELY EG SERLINE OPROCTOR)MATIONIS PRECISELY I'4°BELOW THE GUT- - - - TERLINE ELEVATION. �°'� M1P65•x.°�•'� BE INSTILLED WITH FILTER 5 REMOVABLE FILTERHEWN GUARDIAN FABRIC FACING THE RAINGUARDIAN TURRET INLET. MANUFACTURED BY �Caetex 1N G ARDIAN RAIN GUARDIAN TURRET PRETREATMENT CHAMBER REM BY �xlaIPRo NTRIC n TION r BIORETENTION PONDING DEPTH: 1' MCI A,B PRETREATMEIRFBRBIBRETENTION G,ense-11-D 1318 MCKRy Dr. NE, Su6e 30D AaLE °card"": swal"° Fuo-aoo"e�:ix: i"emauo"1111". www.Rain Guardian.biz TYPICAL DETAIL Ham Lake, MN 55304 763-434-2030 sorpis �1 RAIN GUARDIAN DETAIL C502 NOT TO SCALE B. COMPACTED SUITABLE MATERIAL (FINE GRAINED MATERIAL) HICHEVER IS LARGER (12"WMAXIMUM) SPRING LINE 4" OR Bc/8 WHICHEVER NATURAL GROUND IS LARGER COMPACTED GRANULAR BEDDING NOTE: ALL COSTS OF EXCAVATION BELOW GRADE AND PLACEMENT OF GRANULAR BEDDING SHALL BE INCLUDED IN THE BID PRICES FOR PIPE ITEMS. ReYisneo otx til� HLLLS CLASS B PIPE BEDDING r axo. ARDEN HILLS PIPE BEDDING DETAIL C502 NOT TO SCALE ❑ HYDRANTLEADS / IDENOTES MEGALUGS SLEEVES NOTES: 1. MEGALUGS TO BE USED AT ALL MECHANICAL JOINTS 2. PACE CONCRETE BLOCK UNDER ALL GATE VALVES AND HYDRANTS BENDS 3. THRUST BLOCKING AT ALL TEES, BENDS, AND AT HYDRANTS 4. ALL BOLTS INCLUDING T-BOLTS SHALL BE COR-BLUE. TYPICAL MEGALUG AND THRUST BLOCK LOCATIONS C502 NOT TO SCALE oG 0'05 �o S 1 2022 1 DETAILS C502 FINISH GRADE E o m BILK. M.I. PLUG (CAST IRON) c BB € SET 2' BELOW FINISH GRADE c = 8 a C; L C S F, mc�_f3e Jw3�.9 a \ ® o P.V.C. SOLVENT WELD BY \�....../\ F.I.P. SEWER ADAPTOR EXISTING SUBGRADE SOLVENT JOINT �~ / 2 w � o5�u S CLEANOUT DETAIL V C503 NOT TO SCALE > �r♦ � V W A we a O O a Q ~ w A �3z PER PLAN 0 PLAN MOUND LAST 2 FEET LU Z 0 a OF RIP RAP 1 FOOT DEEP W W (TOP OF RIP RAP SHALL BE DM 0 2 LOWER THAN OVERFLOW W N Z (ELEVATION -SEE PLAN) ELEVATION) P R PLAN 6 5' PER PLAN (EOF_SEE PLA ) EXTEND FABRIC 1 FOOT761NCHESOF21 CL. III RIP RAP GEOTEXTILE BEYOND LIMITS OFEXTILE PLACE RIP RAP ON FABRIC RIP RAP WITH MINIM UMC 61NCHES OF 2INCH 1 FOOT OF COVER (TYP.) RAP ON ROCK BEDDING OVER NCH GEOTEXTILE FABRICDING OVER EXTEND FABRIC 1 FOOT LE FABRIC BEYOND LIMITS OF RIP RAP WITH MINIMUM.AP 1 FOOT OF COVER (TYP.) j SECTION A -A SECTION B-B TYPICAL RIP RAP WEIR OVERFLOW C503 NOT TO SCALE 1 2022 1 Na E CL 00 N N N LL � f0 C C f0 N 02 Y N J Q 1922 DETAILS C503 � Ia.►G:�Cy wMa am aaa, Sala FaY ) MINE _wMINE _w �_w_w_walaamilIMIN _w_w_w_w�_�_� _ *� Imallia aalg— Ila WINE Ills 11110 IN aalll� 3;• �� 'I� Ills 1 at MINE! SIMON UL MallIll— M i'' r NONE No loans. = all11 Illy No un 11 MINE JOE no IN pig mom son BUR INSW nil Noun R_ Alllll� It_ W-- REAR_YARD WEST_E - 6914 SF BRICK 75% ri•. r 990 SF GLASS 10% 485SF MISC. METAL TRIM 5% 925 SF HOLLOW METAL I TRAINING WINDOWS 10% 9314 SF TOTAL 100% 526 SF GLASS between 0 and 12 feet 15% TRANSPARENCY SIUJARD SOUTH_E1,EVAMN 4272 SF BRICK 93% 180 SF GLASS 4% 112 SF HOLLOW METAL TRAINING WINDOWS 2% 24 SF METAL OVERHANGS 1% 4588 SF TOTAL 100% 84 SF GLASS between 0 and 12 feet 5% TRANSPARENCY _41 MCI MI 'all 1111111111111111111 lie EAST ELEVATION \,��J 1 "=10'-01, z a, (A N 17 -------------------- 40A W1 Wi W1 W5 5'-0" 10'-0" a O 0 0 LL LL SOUTH ELEVATION 1"=10'-011 BEYOND w w Q ¢ ,' qL UU CANOPY 0ne Lu Lu ------ ------- ------ - CJ_---_ _—_—_-__—.__—_—_—__.—_ 14On /P PANEI 1az�_0° � TRAINING NORTH ELEVATION A7 1 "=10'-0" WEST ELEVATION s A7 1 "=10'-0" 24 PREFINISHED METAL PANELS ATTACHED TO SMOOTH PLAIN PRECAST WALL PANELS X EXTERIOR KEY NOTES O 12 GLASS AND PANEL OVERHEAD DOOR 25 O PREFINISHED METAL PANELS ATTACHED TO STRUCTURAL METAL STUDS AT FIN WALL 13 CANOPY PANELS, 26 BRICK VENEER CONTROL JOINT (CJ) 1O PREFINISHED METAL FLASHING CANTILEVERD DMETAL OCLERESTORY ALUMINUM WINDOW 27 PAINTED SMOOTH FACED STRUCTURAL PANELS 14 WINDOW IN ALUMINUM FRAME O3 BRICK FACED STRUCTURAL PANELS 15 OVERHEAD DOOR WITH GLASS 28 PREFINISHED METAL PANEL JOINTS. O4 WALL JOINT 16 OPERABLE WINDOW @ BEDROOMS ONLY 29 I L SIGN ATTACHED TO METAL PANELS LOGO SIGN BY OWNER OBI-FOLD APPARATUS BAY DOORS 17 HOLLOW METAL DOOR, PAINTED 30 SILL OF DR. 110A IS 1'-0" AFF OF SECOND FLOOR. O6 PREFINISHED METAL CANOPY 18 WINDOWS (OPERABLE) AT 31 SEE KEYNOTE 39 ON A2.1 REGARDING GROUTED JOINTS. O7 ALUMINUM EXTERIOR ENTRANCE DOOR THOLLOW RAINING ONLY 32 3535 - BUILDING ADDRESS NUMBER 8" HIGH - SEE SPEC. 19 STEEL ROOF EDGE O8EPDM ROOF ON CANOPY EXTERIOR EACH OVERHEAD & O FACE BRICK ON STRUCTURAL STUD WALL 20 RAILING -SEE SPEC. 33 g FOLD DOOR - SEE ELECTRICAL SET AT 16'-0"AFF 14' TALL DOORS 21 DATE STONE @ 13-0" AFF @ 10' TALL DOORS 10 0� EXTERIOR ALUMINUM LIGHT SHADES 22 PREFINISHED METAL STRIP A9 34 LOUVER - SEE MECHANICAL 8TYPICAL 8 GLAZING (V= VENT OUT VISION GLASS) @)BRICK CONTROL JOINT 10'-0" Ko." - 10'-0— '_4 10'-0" 10'-0" � 5'-4" PRECAST WALL PLANK DIMENSIONS TYPICAL SHOWN HERE NORTH ELEVATION 1"=10'-0" PRECAST WALL PLANK DIMENSIONS TYPICAL SHOWN HERE 99 Z aa0 OOW qM 29, N IAVA A C D F H J N.3 7R T I T T � w � p� m 24'-0' 131'.0• 1._0. 3. 4'-0" 4'-0" 4'-0" 3'4' 3'-0' 1'- ' c WB O Sfi - - - - - - _ 97TRZ21NING,,, wow z z_pp z u ??y �owa 4.0" 5.0• 14•_0• 5'_0" 1q'_0" 3'_8" SWq'_0" 40'_0" 5'_0" 161_10. 6'_8" 8'_2" 4-_0" 4-_0" 4-_0" 4'_0" q'_ 3�_q" 27-_2" q'_0" •-0 1'_0.. 20•_0• 18'_5" 6-8 1/2"- I qq_-- - _ .4" 3' 3 — — — — — — — 5� ao - 59'_O" 5 - Al 4 Al o - Wi Wi _ Wi - 0 44a: 2 , w1 - O - - �- 4 ELECT n 40 4 a0 aN 5 m DUTY N ICAL An 14 � EQ z S q� — I MENT , 14 RAGE STOR 3z 3z BRE " 1 46 1 OUT ROOM N v JAN 34 ,A 34 �,AD 35 I o o RR 35 ^ HALL 3, 31 - 5 < 25 - 5'-0• 14' 0" 5' 0" 14' °• 5' °" 4' 0" 4 2'-0" 1 4 1 9fi WOME 6 3fi I I B �'-5" 4 29 IT STOR 29AIR 30 306 5' o'-o" OUT ROOM 5 - o o 9 - - - o - 1 OFFICES W7 a1 s-o 1/z' 5 WB WATCH ROO 4° �! 0' ,'-8" - _ \ SET 0 HALL 41 s4s a TRAINING ROOM 25 1 BREAK ZS 14'-91/2• BREAK OOM in 24 I z7 14 SECOND FLR LINE ABOV L------- ��l SIM - - 4.8...,, _ N1 - _ AI _ - 5'3 o 1 A9 32 _ 1 N 2 $.7 5. — 6 6.8 — F W r /_, a y�v�i �Lfyi y Q y N a z a. a zp o ad Wow HOSE TRAINING TOWE '- " 1'- `° " w •a'V4" 17'-5' 55 in 5 ? W5 s 17 - 1a - - --SBG-- TRA q ----- -- s v 18 w o 0 o I. 43 37A MEN m RELIEF "V a III ;•P 39 - II 39 -4' — --- — - — 2 CORRIDOR z, PB 17 O 0• 5'-4I' 0 14A " 1 2 � f W J 2 T �s za e N p io Y N M. 4 33A �� 5'-3' 28 27 3 EL MP CLOSET 22 38A 3'-4"-8" 5'-0" _ 10'_O" ay. - Y m ° 25 4 19 u 4 ING BA` - v a y 4" 4 < o' 27 qA 7 A11 c - =-'SEE AIRS 3As, 1 _ m o m —388--- i I 25 A c --�BF 3 Ay 25 PARATU BAYS i 9 Y m v ,g C I 54 0 --- C 3 25 N —44H--- APR FIFE 67- 25 44 RATUS BAYS 441---- 1' 8" 27 Al 15'�" 23.0 UT f 5 EXAM ® 24 58 53A ST 53 RAGE 5 " 9'_q" A9 0 y , - 25fM M4AA - mm 4 o y ifi 4 1 44 UP 23ui O 4" ,5'_q" SEE STAIR SECT ION 23'-0' A9.2 LOBBY SE SE STAIR TIO As.zt2l FIFE 100'-0' 14A U 8" 10' ` fi TURNOU GEAR 51 4 0" 3'-4" ,•_0•4'-0' 26'-10" 14'-1112" -10'-0• 49 10'_ . 0' = ECEP I GENERAL zo 2A MUD ROOM 20B 0 19 ICE AD FILE: OF ICE3 e c I STORMS ELTER / CONIF 7 PLAN 1 14 O6 i =BREAKOU ROOM REVIEW O ,q 13 W A7 in ,ac0�1 13 12 „°",LU " 22'_U" Y 3_q" f COLLABORATION SECOND FLR Lill N OI 15 V I i5A v � I I 39 , 10 g s LIBRARY FIRE DEPUTY A 25 RESOURCE MARSHAL CHIEF C 17-0 1/ 12'-0 1Y2" 12'_0" M 1 m I ` T . m I 5 SIST , I F 0 4 - f W (� o' aA 1 J , 1A FE 100'-' S 58 22 00'-0' MINUS - m as 2— A7 4 VEST o ' ' �o 4 m i" " I i6 2 1 ECO CC _ a❑ 1 -0• - R q8 All 1' 6 IRE HIEF 0 w c - r 4A 2 —17 I o Z 5 4 i0 _ I 23 I 58B F u SBC E 1 l 19 1� - - D Y 58D - I SCBAo .3'�" 8'�" q�_8" 3•-0�' 1 J o u 44E B e 44D ii c- r 1'_0" 4 _ 4A (, - aaC - A9 c 7 LIFT R OM -6-` '-f 14'-0' S'-0" ,4'-0" 3'-8" 3'41- f 16A - ,6B GA E1606 16D a 0 - - - - 7 - 7.8 B 9 p - - April 29, 2022 I 1 2 A9., TYP 4 ' 8" 116-8• 45 45A _ _ _ V C fa N +�+ q - n - 5 /FHI(L MAINTENANC 16 "4'4" 10'-0• 3'-01. A9 10'-0• 3'- " 10.4. 3'-0" 10'-01 5'4•CIL 45 2 18 f 5'-0• ,4'-0" 5'-0" 14'-0' -6" 14'-0" 9'- " 18'-0 39'fi• 26'4" 18'-01 26'-6" 42'-6" 58'18• 293'-0" I � � u- A B D E K n1 L M.5 N hN1 N.6 N.2 N.5 N.7 N.8 N.9 P P.4 P.8 Q R G DASHED LINE INDICATES PREFINISHED METAL PANELS ATTACHED TO SMOOTH (6 e uj (6 e O = PLAIN PRECAST WAL PANELS p C 1 MAIN FLOOR PLAN SEE SHEET A2.1 FOR FLOOR PLAN Is 16 Y-2 jQ Al 1"=10'-0" F.F.E. 100'-01, KEY NOTES AND WALL TYPES 2113 Al A E C D ROOF Y T/O/P 127'-0' _ WALL ON TOP OF R.o n -0" - SLOPING PRECAST LOPED PRECAST rc pG� 4 TRAINING ROOF At a'-0�- g�-8" 1 A70 ,�-0�� 10�-a�� �� g�-4" "5'-I" - o W6 W6 rc 51 10'-0" 37'-0" 133 � oYTP-41N 11'�• a,_o„,,._g.a'-0.„.-a.. a'-0.„�_8.. a,_o„11'�• a,_o„g�_a.'10a a5 nit3HOSE TRAINING - 22 q TOWER = ws a O T/O/P 128'-0'DN W6 4 4.0. 8 O< 0 0 0 SLID ,HADING INDICATES REAL BjiICK VENEER !E4 1 133 All Al 36 3' 3'-a" a BED RM RR D RM BED RM RR BED RM B D R RR ED RM F 105 103 3 _ a - 4 - - Ai 4 5 108 I 107 106 104 102 f TO 1100 6 31 P I 3 3 04 3 5 3 101 �J 43 ROOF 3A AllTYP ROOF N Wi v v W, 10 12 108 106 105 / - ,111 03 102 - 100 N 2 THIRD FLOOR P LA 5 38 - i N z 10'-6 1/2• 11'-0" „'-0" 9'-0.. 11'S 1/2" 130 4 1 n-10�_On 4 3'- " 311'-0�� + 8'A•iQo < 1 W1 9' 0" 11'-0" 9'-0• SIM W1 11 109 1- 4 Ss'-o" ° F{ SETRATNIN TOVVER 5 "4'-0• 14'-0" 5'-0" 14'-0• 5'-0" 14'-0"-0 Wi v +,a _ f „ 11, A9.1 6 �7 STU Y 1n 1e W2 W2 W Ag. - W2 W2 yy2 0 117 LOU E '4 REPORTS , as 113 LINEN/LAUNDRY�o - - 4.8 w + - - 5 a - ,18 114 114 2n l 4fi CE STOR MECH 4' 17'-5" y o zo'-0" 4 0 -_ 118A LOUNGE - 116 EV c + s E IPm - ,12 LOCKERS Q U 110A 110 1,0 = a tO F N 3 4 RE ° 2A +V-2" 15'-21/2• -0" 5'-5' 10'-11 1/2" 4'-0' 4'-0' 4'-0• 4'-0•129A 711 A9 A9 AlO2A EL DN qg 1 N14 zIRS 112 110 15NFFE 2 ,19 � 4A SEE STAIR SECJON A ORRID 114'-3' = W,O —14O w1 J- n uia �zo — 15'-0• SEE STAIR SE 122 ,/A9.25.4 W a o__REF _-- - - - REF 3 as KITCHEN ,zo a rs ws _ 1 1DN 2z I A - - -- o Z m�� -0„ 61'-0" 21'-0" 1 87'-0' 1 57' 10 1/2' I ADA RR 1 9'-7 1/2' 29'-0 1/2" 27'-5 1/2" 1-0" ns CV 1 Y 1 0• Y a Ws PT f 5 aA DAY ROOM EPDXY EPO HE LT & e FFE 11 V-3' S 121 2 , W LLN SS m _N UPPER APPARATUS ROOM W6 ws UPPER APPARATUS ROOM TOR/ PANTRY - 124 16 5.7 W9 w1A , 23 +32 TRAINING 28 129 q z° A7 cil 4A 5.9 > 129 121 _ , 4A f EXTERIOR DECK CANOPYA _ -------------- OVE ----------- CW 3fi' E EXTERIO R DECK z 111 HADIN EAL BRICK VIl R OF 4DICATES ER 2 �+ 6 m w 4 125 1 II 1 125 - 2 'S• 11 16'-5" 6.8 O N W1A _ 4A SEE STAIR SECTION A9.2 - 29'-1" 30'-61/ " 2 -61Y2• - - - - - 7 O A RAILING I Y ._8-' I I I q = W 1 9._8. 3W SSA.. , -7.8 4A N 127 8 April 29, 2022 LIFT ROOM � _ 24 _ COMPRE OR 1z8 s 3 1 8 i i A9 1 � I I 9 wz wz e - wz wz I I V 8'-0' 14'4"-0' I-0 14'-0' 5'-0' 14'4' 7'-0' 1 I I I I C 1' 0" 4'-0' 14' 0" 5' 0" 14' 0' '-0 14'4" 5'-0" 16'-0' -0 1 , 0 1 0 1 0 1 -0' -E ' I 1 11. f0 3" 26'-6" I 18'-0• 26'-0• I 43'-0" 1 58'{8" I I 4' 8" 16'-0" Do 153'4" 124'4" ED 293'-0• d C LL C A B D E G H K L M.5 N N.1 N.2 N.5 N.6 N.7 N.8 N.9 P P.4 P.8 O R C m C DASHED LINE INDICATES PREFINISHED Al METAL PANELS ATTACHED TO SMOOTH d (p e om PLAIN PRECAST WAL PANELS u 7 � SECOND FLOOR PLAN SEE SHEET A2.1 FOR FLOOR PLAN $ a) a) 1 KEY NOTES AND WALL TYPES A2 1" =10'4° 2113 A2 1311 BUETOW 2 ARCHITECTS, INC. Exterior Color Schedule Submit samples for approval. See also drawings and spec for additional information. Roof edge flashing- Black as typical except custom red color to match metal panels adjacent metal panels. Thin brick- 2 colors, see project manual for Apparatus Bay color and Office area color. Face brick- same as Office thiu brick at all metal stud exterior walls. Mortar- dark gray for all thin brick and face brick. Aluminum window frames- gray color except for single exterior doors with canopy above. Custom color to snatch red metal panels. Metal panels- custom red color. Exterior glass- gray color. Bi-fold doors- custom red color to match metal panels. OH doors- gray color to match aluminum framing. Sun shades at aluminum windows- custom red color to match metal panels. Hollow metal windows- to match adjacent thin brick color, Paint on west Training wall- match red of metal panels color. BUETOW 2 ARCHITECTS, INC. AN ARCHITECTURAL SERVICES COMPANY 2905 DEAN PARKWAY SUITE A MINNEAPOLIS MINNESOTA 55416 TELEPHONE (612) 45&2626 " f,! l l COLLARS TO GATE (180- OPENING) - TYPICAL 2 EQUAL GATES FOOTINGS BELOW 80LLARD 1 2 A1' 1 A1' 3 9'-4" 'Ai.2-,,F 81, JOINT ;/CONC: f 1 3REAK METAL MANEUVER! IG CONC -APRON PAD BLOCKING °Q - �_ FINISH I o CONCRETE °O ,- SMOOT THIN BRICK FINISH COLOR #1 O -yl ALA OPEN SIDES FOOTINGS 3 W BOLLARD PANEL J DINT J� -ram-- r A�1 ENLARGED PLAN - TRASH ENCLOSURE 114" =1'-Q" PROVIDE HEAVY DUTY LATCH HARDWARE AT CENTER POINT ELEVATION - TRASH ENCLOSURE 114" =I 1-0 " CONCRETE FOOTINGS - f BELOW I HIGH STRENGTH STEEL 2"x2"xl4 GA, wl HIGH STRENGTH STEEL 1 "xl "xi 4 GA. INTERMEDIATES (FLUSH TO OUTSIDE FACE OF 2x2 FRAME). PROVIDE BLACK "NO -SEE" MESH GATE LEAF WITH FOUR (4) COLLARS PER LEAF. HINGES SHALL ALLOW 180 DEGREES OPENING FOR FULL GATE WIDTH - VERIFY wl OWNER. PROVIDE GATE LATCH TO SECURE GATE FENCE PIER DETAIL 1 "=1'-0" FULL HEIGHT MTL. TRASH ENCLOSURE GATES - BY MISC. METALS FRAME - HIGH STRENGTH STEEL 2"x2"xl4 GA. wl HIGH STRENGTH STEEL 1"xl"xl4 GA. INTERMEDIATES (FLUSH TO OUTSIDE FACE OF 2x2 FRAME). PROVIDE BLACK "NO -SEE" MESH 4"D x4"H xl2"W NOMINAL THIN BRICK. ONCRETE PAN L FINISH CONCRETE SMOOTH 6" 0 STEEL GATE POST FILLED wl CONCRETE AND A FIELD WELDED SWING STOP TO PREVENT GATE FROM HITTING WALL z w w w L] U) F- ¢) W 4 in MCHANICAL LOUVER GALVALUME FINISH COKLOR TO MATCH BRICK BUILDING FIELD 1" GALVANIZED STL TUBE 3" SD STL TUBE -� POST {EAST) W' SO STL TUBE POST (WEST) SEE 16/A6.1 FOR POST FLASHING DETAIL --, d PRECAST PLANK METAL COPING COLOR TO MATCH BUILDING FIELD TYPICAL ROOF SYSTEM OVER ROOF INSULATION SEE 1IA8.1 MECHANICAL SCREEN AT RTU'S 1 1I2" =1'-V" O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . O0 O O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ nnn ++ + + + + T� +++++++++ ++++++++++ + p� O + + + ++++++++++ 13 +O NWWWWNp O O N Cn Cn 0o � Cn co Cn Cn (O 00 00 -I Cn --4 -4 O -4 +++++++++++++++++ OOpOppOppOpppOOOpppOpOOOppOpOpON + + + + + + + ++ + + O+ + N N N Cn .O CO 0o .� � .O 00 .N OOpOpOpOppppOppOOppOOOpOOOpppOOpOpO.N � O O O O N n CA -I -I 0o 0o -I � --4 CA) N..pNNG1.pOOpppO ++++++++++++++++++++++++++++++++++ OOpOpOpOOpppppOpppOOOppOOOpOOOpppOpO� OOpOpOpOOpppppOpppOOOOppOOOpOOOpOpO� + N+ GJ+ N+ at O+ N 00 -1 N cc O O O O O O O O O � O O 0o Cn � N N � � ®c)� + + + + + + + + + + + + + + WNNppppp N W 6) 0') O O O O O O O O Cn (O � � --4 CA --4 Cn G W+N+N+N+ pNil Nil (n Cn 6) 00 � � 00 O O O O --4 O M -I O Cn + + + + NO N+ Cn O C9 (C) Cn (.0 Cn O O O O O O O O � 6) 00 G0 n -I (O A CA N o O+ + �� 00 N O O O O O O N n 0o -I CO A + GJ Cn 00 O (C) CA GJ N O O O O 0o N Cn 00 Cn O N 0 + + + + + + + A —1 :1 N O O O O O O O O -I 6) 0o Cn o + � ++ N+ � CA —1 -1 Cn W N O O O O O O O ON C0 Cn -I O N n 11 + + + + + + + + CD 00 CCn � N � O O O O O O O N GJ -I O -I CO N N O O (C) A Cn N O O O O O O O O N N n -I co O N � W 0o N O O O Cr -A � N00 W O O O O N G0 CA --4 O N A N O O O N+ N+ 6) O O O O O O O O N CA) CA 00 O CA) W O+ fN)+ O+ O+ O O+ cc � -4 O (J O O O O O (M co O N (n -I W+ N+ N+ I --4 ..O Cn CA) ( m® ° + + + + + + + + N+ rQ 0)W 0') CA O O O O O O O + W+ + + + NNN �I . .� 0o 0) O O CwC IN) + OO+ �OCn O N N ° CD O O O O O O O O O � 00 �I 00 0) O O O °7z + + + + + ppppp (n N O O O O Cn --4 O O Ln + + + (O °= O O O O O O° O O + + + + + + + -A -A. O CD Op CA N � O � O O co al O O O O O O O (O O 6)n + + + + + O41® + + + + + + CN O O O O O (n (O 6) O O O OCD O, O + N+ 00 N Cn (O CD 90 o G CO CO 6) O O O O O O GJ Cn (O n CO O O N+ W+ ppp+ p+ p+ + + 000 00 CD O (0 -4 () O O O O O -4 6) 00 O -I O O O O p+ 00 (O Cn O O O O O 00 0o 6) 0o O O O O O ° w 0.- NCIS, CIS, (O N N (O (M oo O O O O O + + + + + + + + + + + (A + + + + + + + + + L" Cfl A � � W � 6) G Cfl -4 n N (0 O G O � 11 11 CD CD p+ Nil N+N+N1- NSF N1- Nil Nil M G CA CA M 0) N 00 a) M --4+ + + + + j + + NNil NNNGil N N N 00 Cn A (O W ---4 C0 W 00 O W N � CD CD G + +O O W N W W W� � �O O W (A O0 G CD b) CD C3) 00 6) W CID -4 �G (fl (fl (O �l N G CD CD CDOOpO + p G ...G.OGpOOOOpppOpO ++++++++++++++++++++++++++++++++++ O+ O+ O+ O+ O+ O+ O O+ ®I+ p+ &F O ::::dt + + p+ p+ p+ p+ p+ p+ p+ O N G0 4h, :rh. W N N W W W N GJ N W Cn C Cn M Cn Cn O G G G Cn O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ O+ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . O N N N N O O O O O O N N N W W GJ GJ GJ N O G G G SITE PLAN NO.1 DATE REVISION I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME 3411 KILMER LN N OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER UNDER THE LAWS OF THE CO COLake Johanna Fire Department HQ (NORTH BUETOW 2 ARCHITECTS INC. STATE OFMINNESOTA PLYMOUTHMN55441 p (763)542-9163 N No B2905 DEAN PARKWAY, SUITE A C� 5- 1 �G� FRI N Arden Hills, Minnesota MINNEAPOLIS MINNESOTA 55416 (612) 455-2626--------------------Rich-------llP.E. --- � TYPED OR PRINTED NAME: Richard A. Lindell P.E. DATE 16-JUN-20 REG. NO. 7820 LINDELL ENGINEERING,INC. T D m m O z y _ z r o v �- C G) Cn o Z m r D Z� <„ O r r 7(�yy M c> Z �l m Q �_ m _70 m cn z z m z G� r cn 0 G� 0 c o 2 2 22 m v C z n r m W o ri z o z r- D � Cl) m O D � 0) c'i o _._ O , IT1 r s� l I v O m o N wN00 O O O /\ Z - O a� _CD CD CD rn � � O°r�D /\\\\\ FT-1 cti \/ x T N 4�. ° ° nCD T � o ETl \� Tr TTTT I I D o O \\/\\CA � O r,-1 o ///\ A � z :EEzo \�70/ o c� S O CD D < � C- S O O � O 7 D m D z O O z a = C- m r o -0 � F, o rn D- U) 0 N FT-1 - O I T O I N o N O D z I 0� T O� I � I w O� _J T O I O Cn z �M I � � I � O—n z� M �T 7z O O W I I N co m o � N O D D W T W O G O z 3C O C G FT-1 O Z J (n O z 2 O T2 O N � O � I D � I N O O T O G7� G7 G7 G7 40 W TW C) N D O I � r L T o T co co PQ SITE PLAN NO. DATE REVISION I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME 3411 KILMER LN N OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED ENGINEER UNDER THE LAWS OF THE Lake Johanna Fire Department HQ NORTH BUETOW 2 ARCHITECTS INC. STATE OFMINNESOTA �p PLYMOUTHMN55441 O o 2905 DEAN PARKWAY, SUITE A �o< � Re ��s3>5a�s1a3 NN Arden Hills, Minnesota MINNEAPOLIS MINNESOTA 55416 (612) 455-2626----------------AME:Ri--------llP.E. --- � TYPED OR PRINTED NAME: Richard A. Lindell P.E. 19 DATE 16-JUN-20 REG. NO. 7820 EINDEEE ENGINEERING, INC. � � = = G� O m m m m � C� oo D D� � m r � rn O p r_ �] = G) � D p= r r Cn D C� O� r C = u� D C� O� r C = Cn D C� O� r C = Cn D C� O� r C = Cn D C� O� r C = u� D C� O� r C 0 m z m m� 0 m m� 0 m m� 0 m m� 0 m m� 0 m m� O n D z c � O� m z< O� � O � � Z D0 � D G� Cn r O � � C � D � � C � DO D � � C � DO D � � C � DO D � � C � DO D � � C � DO D � �_ rOm n� � �OSmn��� n���] n��Z7 n���] n��ZJ n��ZJ 0 Cn � O o D� Z � r O O�� r < � m 2 m � O D � m= m O D � m= m O D � m= m O D � m= m O D � m= m O D Z � c� mzp c C» � � � � O o�n�=m�cr m � cn O�cr = cn O�cr = cn O�cr = cn O�cr = cn O�cr = cn p C� c m � o � O � � O � � O � � O � � O � � O OC z n m D 0 m�� n m O� n m O� n m O� n m 0� n m O� �02� Dp O�oG� O�oO OZ<oG� O�oO OZ<o0 W n D z c �00 � _ �� m�QcOc m�Op ��cn p��cn p��Cn p��cn p��Cn p��Cn Z�� m�cci�� �JOz r WpZ rWpz r�pZ r�J�Z ��]pZ �� oczm �� o z p D c� �Dp �� m ocDc� ��� m p o�� Dc� r c� 000DG� � m oWDp � c� m m c� �„� c cnn- z m c�Om c�pm m c»m m c� —m c»m m �mpZ m��� zcnm zcnm zcnm O�m z�m O�m � mp 0� � m D D o m D� o m= D D m=� 0 m= D� m c D c� z � o z� o z� o D� o Z� o D� < oo W 00 00 00 00 00 00 � � O O O O O O O O Z � N N N N N N N N= m m m m m m m m v_ O O O O O O O O O� O o O o O o O o o� O c � c c � c c � c c � c c< o z o z o z o z C:) z o z o z o z o z 0 N < N < N < N < N < N < N < N < N < r �I m �I m �I m �I m �I m �I m �I m �I m �I m� D D D D D D D D D m r r r r r r r r r r� w r C o o m r cn � r C o o m r cn e r C� o m r �l � r C o o m r �l � r C o o m r 1� r C W o m r�� r C S'' o m r�� r C W o m r�� r C � o m r D � o o o o � � o o �� o o � � o o � � 1 0 � o � o � o �� m � m�� m�� m � m � m o m m o m m o m m o m � O O O O O O O O O Z1 � 11 � S� CNC CNC CNC C�C C�C CC � w e c p � c � c � c � c � c � c D w m D� � �m < D c�� < D n� < D < D < D < D c m � N T. N � N T. � T. D m 0 0� o� o� o� o� o�� c 00 �' m �m z �m �m z �m z �m z �m z m � D < D D D D D O W � N N � � (n Cn (n Cn w (n (n � � oo m o� m oo m o� m oo m o� m Z Z N �J fV IV �J fV �J < c� m = m = m = m = m = m O N Z O m r� m or 6m 0 I I N m Z m m m 0 m 0 (9) 0 0 0 0 0 0 0 0 0 �J m'3 a➢ n �5 z�5 C 5 5 VS ao5 myr�� cg -,A 90- -9Hu �A oA o� A� ��➢ �� ohm ��A �o ova 6 06 z I I I T I I I I 20 S: o� �D M =omra y Z m Z =oA a_ m - 0 ooaA---12 a Noo Hp a fN Z n3MR m N fA O W ELECTR/CAL SITE PLAN o N �' HiaON NO. DATE D428,22 REVISION CD ISSUE �� BUETOW 2 ARCHITECTS, INC.°_ 2905 DEAN PARKWAY, SUITE A MINNEAPOLIS, MINNESOTA 55416 (612)455.2626 °P Es's� „E�rq �EAr E MNN em .—I.on; -das ���I:� w91ne �aeAoadero nPm�as a—omoe Lake Johanna Fire Department HQ Arden Hills, Minnesota � Ia.►G:�Cy wMa am aaa, Sala FaY ) MINE _wMINE _w �_w_w_walaamilIMIN _w_w_w_w�_�_� _ *� Imallia aalg— Ila WINE Ills 11110 IN aalll� 3;• �� 'I� Ills 1 at MINE! SIMON UL MallIll— M i'' r WALL —SIGN S toot diameter flat metal panel logo sign 28 SF of image, 2 signs thus, east and west elevations at apparatus bays MONUMENT SIGN. Height- 60 inches tall Text- both faces Width- 72 inches 6 inch high lettering Thickness- 8 inches 8 SF or 16 SF total for both sides Illuminated with ground light Angle slope towards Pine Tree Drive KO-N U-M.Elff—SLGN Height- 60 inches tall Text- both faces Width- 72 inches Sign copy area of rectangle includes logo and text Thickness- 8 inches 4-6 high X 8-0 wide 36 SF or 72 SF for both sides Illuminated with ground light Angle slope towards Pine Tree Drive 928 — / P6 I C/� I 01 cA I I I I I I I I I I I I I I 0V63 I c / N N M rn � 16 0 I 1 M / N rn NCN 17 l I � / I 18 i 19 12 L 21 \ 09 2 23 / 1 I 24 � 27 I � I 31 \ 922� 1 32 30 1 _ 2 II �� 925.533 i Z w 0 / 62 55 ------------ 927 u O I ix El 9Q d I I 12 I 1 13 I I � I LL I 14 1 I � / I _ 50 48 \ 54 53 , 51 �Vz a( 5� / i �9/ I 47 1 Ilk/I / `2� / / / 46 EXISTING TREE TO I 59 1 / BE REMOVED, TYP. � I 60 / PROPOSED FIRE STATION I FFE: 930.00 (ARCH: 100'-0") TRAINING TOWER LEGEND: / X X 1 EXISTING TREE TO REMAIN / 1 EXISTING TREE TO BE REMOVED TREE PROTECTION FENCE c m TREE PROTECTION FENCE PER DETAIL EXISTING TREE TO REMAIN, TYP. D U) \W w W >—> w Z_ TREE NOTED TO REMAIN �Q DRIP LINE oo 00 0 0 000 4' SNOW FENCE WITH POSTS @ ®0 0 �o 00 09) 8' O.C. (MAX.) AT EDGE OF 0O6°� �o °O�oo CRITICAL ROOT ZONE (A RADIUS o 0 0 00 � O ��00 kQ OF 1-1/2 FEET FOR EVERY 1 °0 0 o°Q°} C INCH OF DBH FOR THE TREE 00�00� \\o��jj� C�°Q TRUNK OF THE TREE BEING �0 0 ° O� 000�0 O PRESERVED. REFER TO PLAN� O OOpSq FOR LOCATION. ELEVATION PLAN NOTE: TREE PROTECTION SHALL BE PROVIDED BY CONTRACTOR AS REQUIRED TO AIDE IN SURVIVABILITY OF EXISTING TREES TO REMAIN. DO NOT STORE MATERIALS OR DRIVE EQUIPMENT WITHIN THE TREE DRIP LINE AS DESIGNATED ABOVE. MAINTAIN THE FENCE INTEGRITY AT ALL TIMES THROUGHOUT CONSTRUCTION. TREE PROTECTION FENCE SHALL BE IN PLACE PRIOR TO THE START OF DEMOLITION. TYPICAL TREE PROTECTION DETAIL NOT TO SCALE m IM Tree Preservation Notes: C rn PROTECTION PER DETAIL 0' 12.5' 25' 50' SCALE:1 "=25'-0" NORTH Know what's below. Call before you dig. Existing boundary, location, topographic, and utility information shown on this plan is from a field survey provided by Sunde Land Surveying • Do not begin tree clearing work until tree protection measures are in place and to the permit approval of the City of Arden Hills Forestry Department has been granted. • Critical Root Zone: Install high density polyethylene safety fence, 4 ft. high, international orange, at the Drip Line or at the Critical Root Zone whichever is greater, of trees to be preserved per detail 1, prior to commencement of earthwork activity. Field -staking of the fence location(s) subject to City of Arden Hills approval. • Where silt fence and proposed tree protection fence overlap, place the tree protection fence on the outside of the silt fence, double -staked at the break-point. • Refer to Tree Protection Detail 1, Sheet L101. • The contractor shall prune the canopy of existing trees to remain where the canopy is in jeopardy of damage due to the new improvements shown. It is recommended that the contractor hire a certified arborist to perform the pruning. Any branches broken during construction shall be immediately trimmed and wounds painted to prevent further damage. • Perform work in accordance with the laws, ordinances, rules, regulations, and orders of public authority having jurisdiction. Secure and pay for permits, governmental fees and licenses necessary for the proper execution of the demolition work. • Provide protective coverings and enclosures as necessary to prevent damage to existing work that is to remain. Existing work to remain may include items such as trees, shrubs, lawns, sidewalks, drives, curbs, utilities, buildings and/or other structures on or adjacent to the demolition site. Provide temporary fences and barricades as required for the safe and proper execution of the work and the protection of persons and property. • Remove debris, waste, and rubbish promptly from the site. On -site burial of debris is not permitted. Burn no debris on the site. Salvage material not otherwise indicated to be reused shall become the Contractor's property and is to be removed promptly from the site and disposed of in strict accordance with all applicable laws, regulations, and/or statutes. • Buildings, features, surfaces, and other descriptive references shown on this drawing are for informational purposes only. Field verify all information relevant to the project prior to proceeding with the work. Visit the site and determine all site conditions and hazards. • This plan is a guide as to the anticipated amount of disturbance expected due to proposed improvements. The contractor is expected to take all necessary precautions to ensure trees noted to remain are not damaged during construction. Do not store material or drive within the drip line of existing trees to remain. Be aware of overhead branches for clearance of material and equipment. • This plan is not a guarantee that existing trees will survive during/post construction, but rather a guide to help assure their protection and greatest chances of survival at the surface level. Further protection measures outside this scope could involve ecologists, foresters and arborists. • Notify the Owner's Representative and Engineer when tree protection fencing is taken down to perform work in conjunction with the new improvements noted in this plan set. The contractor is responsible for re -erecting the tree protection fence immediately after the work is complete, when ever possible • Trees shown as existing to remain (be preserved) that are damaged / killed as a result of construction activities are subject to replacement per the City of Arden Hills Tree Replacement penalty. Replacement trees are to be paid for at no additional expense to the Owner. LANDSCAPE REQUIREMENTS Al MINIMUM CALIPER INCHES REQUIRED 128.0 IN = 41,e805F/320 MINIMUM CALIPER INCHES PROVIDED: 0" EX. SIGNIFICANT CALIPER INCHES ON -SITE + 125 PROPOSED CALIPER INCHES MINIMUM LANDSCAPE LOT AREA REQUIRED 40,2935F = 1Tol,1125F LOT AREA *.25 MINIMUM LANDSCAPE LOT AREA PROVIDED 55,8355F TREE RATIO (BUILDING STORIES 2) CALIPER INCH: (2"-3") (3. 5"-4") (4. 5—To") REQUIRED To4"150% 3&"/30% 25"/20% PROPOSED 2To(R2.5" 11 Ca3.15" 5(a5.0" PERENNIALS/SHRUBS REQUIRED 2,C e-15F = 2ro,0­155F LANDSCAPE AREA *0.1 PERENNIALS/SHRUBS PROVIDED 2,(�2&5F EXCLUDES WETLANDS AND BASINS REQUIRED PLANTING ISLANDS 2,34& F = 23,4ro55F PARKING AREA *0.1 PROVIDED PLANTING ISLANDS 2,4595F ROW TREE PLANTING REQUIRED (PINE TREE) I TREES = 1 TREE / 40LF = (445 L.F. ROW - 149 L.F. DRIVEWAY) / 40 ROW TREE PLANTING PROVIDED (PINE TREE) I TREES (5 NEW + 2 EXISTING) DIVERSE SELECTION REQUIRED FULL COMPLIMENT OF OVER5TORY, ORNAMENTAL, AND EVERGREEN TREES, 5HRU55ERY, AND GROUND COVERS PROVIDING PEAR -ROUND COLOR AND INTEREST. REFER TO SHEET L104 FOR EXISTING TREE INVENTOR-'' TABLE AND MITIGATION INCHE SUMMARY REFER TO SHEET L102 FOR NEW DEVELOPMENT REQUIRED TREES AND MITIGATION REQUIRED TREES PROVIDED LANDSCAPE REMOVALS AND TREE PRESERVATION PLAN: 9, X0 - 2. U N am �� w UDJ(Ad aW mE U w� s1 U m ow Z Z d�oo Uawz ¢ Ux�� � Z>mw� w� W Z a>wZi Lli wx�aa o- �wwaFl � aOza� Q � oo�ow�p' Z M zwarnx M acww Z o ■ cc N CD Z N LO LO ■► N_ C W Q � wLO H LO Cn aa 0 N Z z �l� 0 a vi aZi Wwa LOw z oZ N ca w J z O E75� W N of Lo w 't � (V Q � Q cc 0. z 2022 a N E N � 0 O U) LL � c� — O = N N J Q 1922 TREE PRESERVATION PLAN L101 5b HTe 2 VPd M5 I zj� 7PT Te I H PT 3 2 N Ao 2 AN 2 I H "FN M m m m PROPERTY LINE AREA SEE NOTES. EXISTING 2" OAK TO REMAIN, TYP. � ■ alw�w�---�.w�.l►,w�w�w�ww�wlw�w�-}�: : saia.1■,:�- •1.-1a��l�iaar•�=w<•w�'d'� '�� '�'� ���'• r �:�:� -- �. -��■:_. iJill �I � r � m • I I z: �, _I___■■■■■� :. - goo°o ,��e Oao 1 V v • 1 /■/■ ! /■ 00 AID■-- o ^apo..anroovoacao • • . ��'p 't • o ■ • � �II © ■..I■ r�� 74p g'A ■II IA■■lu�� I�II�o• aOo EERIE =�T ��" ■■ Wau■ �iaiinn7s• °: a_°o0�1 Mao.:::=•ii�!: - • 1:1AN 101, �r■III� I , 11 �y ■if_nii��� ea■i ME oil!I� _ v � Eill'I:�.L �■.� 111 1.1 [10 iii�fI.... P�VING PER CIVIL PLANS lud NfliM i � �u__1 111■/, :■iiii111111111110 nl.-. r��_u • 2 1? TRAINING TOWER i PAVI G PER CIVIL PLANS I' 5' WIDE 1` RF SOD STRIP � III STORMWA ER INLET, SEE GENERIL NOTE 411 ■ © ■ m 0 . •r ■ ■ �� • S1,14- ��II r��JJ100 .,■.,� 1,..1._„■■ ■�..._..._. i■iil � 1 III -r .�A"-.V_I■ `4'NZ, ■.IIII IOWA- e ■--ooF, N11 II�I�Gn_�iotl �- eVENELIm •u n■a■■ L..a.■■ , MINA�.... �'11%111�►irur I�IIIJ� . —•�-FAMA11111111►WA —� ■ �III_,__I,e_� - .�.��■r.. av r �mlrll■�Il�il NMI I loin nil --- -- - - -- �I:ii!Ill!is �� ai ail �� • . - - PUBLIC ENTRY PAVING PER CIVIL PLANS 6' BENCH PER ho IG Nw71 10 E 9 SCULPTURE BY OTHE Tt 5 ROCK MULCH I fiv M53 7 hx Aa2 2 Tt IG 4 Ho 4 hx 4 c7 5 NO ES 1 -1,7 J FLAGPOLE PER CTURAL T IX + + + + + + I to 0 00 000 29 + + + 5a + + + II 00 00 0000o E + + + + + + + + 12 1 0' 5' 10' 20' FRONT ENTRY ENLARGEMENT. SCALE- 1"=10'-0" NORTH a� Q � 0 3 s U N N cn �O'c dam o 0 • .� J m a a N m E U w� ~ W C7�zWa Z Z x g y O � 6W o � a �F� W~ U) o�C K K W W z cW7a�z � ayW>� ream o- 1 w�1 �cO H fV a U O Z m d O aoza� a ry �OgZg = 00 0 w� Q• Z M Z amx cli 0 o a U W WLii x�a=z W Q ramm� m 0 N LG Z N LO w>■ LO �► N C W H Q � LLI LLO H Ln Cn aQ O NQw y L� � J IME J Wwa 0 W 141) tM CIO N CID General Notes: cr_ 1 . See Civil Engineer's plans for site plan layout and dimensions. LLJ 2. Contractor to coordinate all work in the city right-of-way with City of Arden Hills Public Works Department. z} 0. See Architect's plans for additional requirements regarding the site plan layout. 4. Place a minimum of 5" topsoil or slope dressing on all areas disturbed by construction, including right-of-way boulevards, unless specified otherwise. `3 5. See Civil Engineer's Plans for proposed utilities. Q N 6. See Sheet L101 for Tree Preservation Plan. Q ° 7. See Sheet L102 for Landscape Plan. ° f 8. See Sheet L100-L104 for Details, Notes and Schedules. 9. See project manual for irrigation requirements. " ct- - to coordinate it � t � e 10. Contract -or _� _ planting wI_fi Ilgfi_ p�1�5. 11. Ripr-ap at 5_ormwa_er inlets (unless otherwise noted on CIVII Plans) shall be MnDOT Class II stone over DeWitt Pro 5 oz. needle -punch geotextlle fabric. Riprap to extend to the bottom of the pond to prevent scour and erosion of the seed area. 0' 12.5' 25' 50' 9 ROCK MULCH Know what's below. Call before you dig. LANDSCAPE PLAN: SCALE :1 "=25'-0" NORTH 2022 a W E S✓ 0 O U) LL 00 �-0 J Q 1922 LANDSCAPE PLAN L102 Landscape Notes: 1. Tree saucer mulch to be four inches (4") depth natural single -shred hardwood mulch for trees outside of a plant bed. Install per tree planting detail. 2. Refer to civil plan sheets for grading, drainage, site dimensions, survey, tree removal, proposed utilities & erosion control. 3. All plant material shall comply with the latest edition of the American Standard for Nursery Stock, American Association of Nurserymen. Unless noted otherwise, deciduous shrubs shall have at least 5 canes at the specified shrub height. Plant material shall be delivered as specified. 4. Plan takes precedence over plant schedule if discrepancies in quantities exist. 5. All proposed plants shall be located and staked as shown. 6. Adjustment in location of proposed plant material may be needed in field. Should an adjustment be required, the client will provide field approval. Significant changes may require city review and approval. 7. The project landscape contractor shall be held responsible for watering and properly handling all plant materials brought on the site both before and after installation. Schedule plant deliveries to coincide with expected installation time within 36 hours. 8. All plant materials shall be fertilized upon installation as specified. 9. The landscape contractor shall provide the owner with a watering schedule appropriate to the project site conditions and to plant material growth requirements. 10. If the landscape contractor is concerned or perceives any deficiencies in the plant selections, soil conditions, drainage or any other site condition that might negatively affect plant establishment, survival or guarantee, they must bring these deficiencies to the attention of the landscape architect & client prior to bid submission. 11. Contractor shall establish to his/ her satisfaction that soil and compaction conditions are adequate to allow for proper drainage at and around the building site. 12. Contractor is responsible for ongoing maintenance of all newly installed material until time of owner acceptance. Any acts of vandalism or damage which may occur prior to owner acceptance shall be the responsibility of the contractor. Contractor shall provide the owner with a maintenance program including, but not limited to, pruning, fertilization and disease/pest control. 13. The contractor shall guarantee newly planted material through two calendar years from the date of written owner acceptance. Plants that exhibit more than 10% die -back damage shall be replaced at no additional cost to the owner. The contractor shall also provide adequate tree wrap and deer/rodent protection measures for the plantings during the warranty period. 14. This layout plan constitutes our understanding of the landscape requirements listed in the ordinance. Changes and modifications may be requested by the city based on applicant information, public input, council decisions, etc. 15. The landscape contractor shall be responsible for obtaining any permits and coordinating inspections as required throughout the work process. 16. Plant size & species substitutions must be approved in writing prior to acceptance in the field. 17. All edger shall be professional grade black steel edger, 1/8" thickness. Anchor every 18" on -center (minimum). Submit sample. 18. Landscape Contractor is responsible for coordination with the General Contractor, to protect the new improvements on and off -site during landscape work activities. Report any damage to the General Contractor immediately. 19. All sod areas shall be prepared prior to planting with a harley power box rake or equal to provide a firm planting bed free of stones, sticks, construction debris, etc. Any alternate seed mixtures, rates, & application method noted shall be submitted to the landscape architect for approval. 20. The Landscape Contractor shall furnish samples of all landscape materials for approval prior to installation. 21. The Landscape Contractor shall clear and grub the underbrush from within the work limits to remove dead branches, leaves, trash, weeds and foreign materials. Remove trees where noted on the plan, including the stump to 30" below grade. 22. The landscape contractor shall contact Gopher State One Call no less than 48 hours before digging for field utility locations. 23. The landscape contractor shall be responsible for the removal of erosion control measures once vegetation has been established to the satisfaction of the municipal staff. This includes silt curtain fencing and sediment logs placed in the landscape. 24. The landscape contractor shall be responsible for visiting the site to become familiar with the conditions prior to bidding and installation. Coordinate with the general contractors on matters such as fine grading, landscaped area conditions, staging areas, irrigation connection to building, etc. 25. Irrigation: See project manual. Provide all sleeves under paving areas as required. 26. Topsoil Requirements: All graded areas of the site that are designated on the plan set for turf sod shall have no less than 6" of imported top soil, areas designated for shrubs, trees, and perennials shall have no less than 12" of imported top soil, meeting MnDOT classifications for planting soil for trees, shrubs, and turf. Slope away from building. 27. Landscape contractor must prove the open sub -grade of all planting areas after their excavation is capable of infiltrating a minimum requirement of 1/4-inch of water per hour prior to installation of plant materials, topsoil, irrigation, weed mat, and mulch. Planting areas not capable of meeting this requirement shall have 4" diameter X 48" depth holes augured every 36" on -center and filled with MnDOT Free -Draining Coarse Filter Aggregate. Re -test sub -grade percolation for compliance to infiltration minimum requirement. 28. Turf Sodding & Seeding activity shall conform to all rules and regulations as established in the MnDOT Seeding Manual, 2014 edition, for seed bed preparation, installation, maintenance, acceptability, and warranty. Full Sun Turf Sod: 70% Kentucky Bluegrass, 10% Chewings Red Fescue, 10% Perennial Rye, 10% Re -Green. Shade -Tolerant Sod: 50% Chewings Red Fescue, 35% Rough Bluegrass, 15% Re -Green. Submit turf sod vendor's turf grass blend schedule for review. Install turf sod within 24 hours of cutting. Where new sod meets existing turf, the contractor will sub -cut the soil to ensure thatch elevations of old and new turf match. 29. Unless otherwise noted, all plant beds shall receive 4" depth locally available 1" dia. limestone rock mulch, over weed mat. Submit mulch sample for Owner approval. Bryan Rock or Equal. Install rock mulch 1" below back of curbs or walks to prevent spill -over. Do not mound rock mulch. Coordinate finished grade condition with earthwork subcontractor. 30. Where noted / identified, wood mulch areas shall be 4" depth of single -shred hardwood mulch over fabric weed mat. Do not install weed mat under perennials, with the exception of ornamental grasses. Submit mulch sample for Owner approval. Overlay wood mulch with Preen pre -emergent granule. Apply per manufacturer instructions. 31. Bench at Front Entry: Forms+Surfaces 'Dash' Bench, 6' length, Frame Powdercoat: Slate Texture, Model No. SBDSH-72C, final location to be determined in the field with Owner and Architect approval. Surface mount per manufacturer's specifications. Contact for Quotation: Emily Neuenshwander, Territory Manager I Forms+Surfaces I www.forms-surfaces.com I emily.neuen@forms-surfaces.com 1952.465.7710 32. The Landscape Contractor shall establish to his/ her satisfaction that the earthwork is complete, topsoil spread to correct depth, and compaction conditions are adequate to allow for proper drainage at and around the building site. Notify the General Contractor immediately if soil conditions left by the earthwork sub -contractor are not satisfactory. No additional compensation will be paid for discrepancies due to earthwork once the landscape contractor begins plant material installation. 2 L103 NOTES: SEE PLAN FOR CROSS SLOPE DIRECTION. MAINTENANCE STRIP WIDTH VARIES, SEE PLAN. ROCK MULCH TYP. SECTION NOT TO SCALE 18" MIN_ SEE PLAN FACE OF WALL OR BACK OF CURB. MULCH PER NOTES EDGER PER NOTES FINISHED GRADE. 3 OZ. FILTER FABRIC, TURN -UP AT EDGES, OVERLAP SEAMS 4". PITCH SUB -GRADE TO DRAIN AWAY FROM BUILDING WALLS & CURBS. PERENNIAL / PLUG PLANT. MULCH PER NOTES. EDGE CONDITION VARIES - SEE PLAN. NOTE: HAND -LOOSEN ROOTS OF CONTAINERIZED PLANT MATERIALS. PLANTING SOIL - PER NOTES. CONTRACTOR PREPARED SUBGRADE. TYP. PERENNIAL PLANTING - SECTION NOT TO SCALE NOTES: DO NOT HEAVILY PRUNE THE TREE AT PLANTING. PRUNE ONLY CROSSOVER LIMBS, CO -DOMINANT LEADERS, AND BROKEN OR DEAD BRANCHES. SOME INTERIOR TWIGS AND LATERAL BRANCHES MAY BE PRUNED; HOWEVER, DO NOT REMOVE THE TERMINAL BUDS OF BRANCHES THAT EXTEND TO THE EDGE OF THE CROWN. ONLY PRUNE DEAD BRANCHES THE FIRST YEAR AFTER PLANTING. MULCH RING: 4' DIAMETER MINIMUM, 6' DIAMETER PREFERRED. FURNISHING AND INSTALL 6" DIA. WHITE PVC TRUNK GUARDS AFTER PLANTING. MARK THE NORTH SIDE OF THE TREE IN THE NURSERY, AND ROTATE TREE TO FACE NORTH AT THE SITE WHEN EVER POSSIBLE. INSTALL 6" WHITE DRAIN TILE TRUNK GUARD OPEN BURLAP AND REMOVE EXCESS SOIL UNTIL THE TOP OF THE FIRST - MAJOR ROOT IS VISIBLE. PLANT TO THIS DEPTH TO HELP PREVENT ENCIRCLING ROOTS. WOOD MULCH. DO NO PLACE MULCH IN CONTACT WITH TREE TRUNK. MAINTAIN THE MULCH WEED -FREE FOR AFTER PLANTING. NOTE: FOR DIMENSIONS OF PLANTING AREAS SEE PLAN, SOIL BACKFILL SHALL BE GARDEN BLEND SOIL ( EQUAL MIX OF COMPOST, SAND & SOIL) PER NOTES. Al EACH TREE MUST BE PLANTED SUCH THAT THE TRUNK FLARE IS VISIBLE AT THE TOP OF THE ROOT BALL. TREES WHERE THE TRUNK FLARE IS NOT VISIBLE SHALL BE REJECTED. DO NOT COVER THE TOP OF THE ROOT BALL WITH SOIL. DOUBLE STAKE WITH WIRE: POLYPROPYLENE WEBBING STRAPS THROUGH THE EYE OF THE CINCH -TIE RUBBER SUPPORT. AVOID DAMAGE TO THE ROOT BALL WITH SUPPORT STAKES. NURSERY GRADE FIBERGLASS TREE STAKES. 11/16" x 6-0". 4 IN. HIGH EARTH SAUCER BEYOND EDGE OF -I I �- ROOT BALL (FOR ISOLATED TREES ONLY). III - REMOVE ALL TWINE, ROPE AND WIRE, AND BURLAP FROM TOP THIRD OF ROOT BALL. EXPOSE ROOT FLARE BY REMOVING EXCESS SOIL FROM THE TOP OF THE SOIL BALL & DISPOSE OF OFF -SITE. ENSURE THE FIRST MAIN LATERAL ROOT IS WITHIN TWO INCHES OF FINISHED GRADE WITHOUT EXCEEDING FINISHED GRADE PLACE ROOT BALL ON UNEXCAVATED OR TAMPED SOIL. ENSURE TREE PIT PASSES REQUIRED PERCOLATION TESTING. TAMP SOIL AROUND ROOT BALL BASE FIRMLY WITH FOOT PRESSURE SO THAT ROOT BALL DOES NOT SHIFT. DECIDUOUS TREE PLANTING - SECTION NOT TO SCALE ON CENTER SPACING AS STATED ON PLAN. WIDTH OF HOLE EXCAVATION SHALL EXTEND A MINIMUM OF 6 INCHES BEYOND THE PLANTS ROOT SYSTEM. PLANTING SOIL - PER NOTES. 3" DEPTH WATERING BASIN. MULCH FINISHED GRADE PLANT ACCORDING TO PLANTING DETAILS FOR ISOLATED PLANTING LOCATIONS WITH THE EXCEPTION OF REDUCED HOLE WIDTH. TYP. SHRUB PLANTING - SECTION NOT TO SCALE 0 0 Cr� 00 aw 0 � oW LLZ 0 W W U W W S0 Q W Wa 2 m �o W J W J =m W W I� Ii�i��g1�lI TWICE BALL DIAMETER NOTE CONIFER TO HAVE SHREDDED HARDWOOD MULCH UNLESS NOTED OTHERWISE. NO MULCH TO BE IN CONTACT WITH TRUNK. PLACE ROOT BALL SO THAT BASAL FLARE IS 1" ABOVE SURROUNDING GRADE. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THE TREES ARE IN A PLUMB POSITION THROUGHOUT THE WARRANTY PERIOD. ROOT BALL TO SIT ON MOUNDED SUBGRADE, REMOVE BURLAP FROM TOP 1 /3 OF ROOT BALL MULCH - 4" DEEP - SEE SPEC PLANTING SOIL - SEE SPEC. SOD TOMAHAWK TREE STABILIZER STAKES. MINIMUM (2) PER TREE. DRAIN SYSTEM IS NECESSARY FOR HEAVY CLAY SOILS. 4" DIAMETER AUGERED HOLE, 42" MIN. DEPTH. FILLED W/ 3/4" DIAMETER DRAIN ROCK. COVER W/ 6" FILTER FABRIC. CONIFEROUS TREE PLANTING - SECTION NOT TO SCALE 18" MIN. PERENNIALS PERENNIAL PLUG PLANT SEED PER PLAN EDGE CONDITION VARIES - SEE PLAN. NOTE: HAND -LOOSEN ROOTS OF CONTAINERIZED PLANT MATERIALS. PLANTING SOIL PER CIVIL CONTRACTOR PREPARED SUBGRADE TYP. PLUG PLANTING DETAIL NOT TO SCALE PRAIRIE PLUG PLANTING LAYOUT NOTES: INSTALL PRAIRIE PLUGS ACCORDING TO THE PLANTING NOTES AND USE PLUGS FROM THE PLANTING PALETTE. a � a x'w^^ � - 4? j a Z a Q N >'c LU a 0 E UD J (Ad avid U w� o� w >= 0 gV =Zwa �ow m Z Z z O 0 0 Oawz Q Ux�� zrmwg � r� t~i1 w w Z w J a } w E O Arnow wx�Qa g Q o- a��=~l 0 m H x 0 N Q 0 2 Q V O z w no -ow Q, Q N = M Z zwQinx M Q o JVLL55� avww =�a�z r Q W W M w Q co0 ■ to N CC Z N Ln Ln ■► N W Q � WI* N� j � 1n Cn Q~ O N N Z Z 0 0. Wwa a C)Z_ N N m OV a 2022 0 N E (6 Co �0^ W a) LL C: cu c 0 T Co J Q 1922 LANDSCAPE DETAILS, NOTES AND SCHEDULES: LANDSCAPE DETAILS, NOTES,& SCHEDULES L103 NOTE: TREE SIZES LISTED BELOW ARE PER CITY OF ARDEN HILLS REQUIREMENTS PLANT SCHEDULE SYMBOL CODE BOTANICAL NAME EVER,, 9EN TREES Ab Abies balsamea Calculated as 2.5" Cal. Pd Picea glauca ' Densata' • Calculated as 2.5" Cal. Acer rubrum 'Northwood' PT Populus tremuloides QA Quercus albs ORNAMENTAL TREES Ao Aesculus glabra Ohio Buckeye AG Amelanchier grandiflora Autumn Brilliance Autumn Brilliance Serviceberry Clump Form 61 Ms Malus x 'Spring Snow' Spring Snow Crab Apple Si Syringa reticulata 'Ivory Silk' OVEELETORY TREE AS Acer x freemanii 'Sienna' COMMON NAME Balsam Fir Black Hills Spruce Northwood Red Maple Quaking Aspen White Oak • l Bi Om Te SHRUBS Betula platyphylla 'Jefpark' Celtis occidentalis Quercus macrocarpa Tilia cordata ' Erecta' Ivory Silk Japanese Tree Lilac Sienna Glen Maple Parkland Pillar Birch Common Hackberry Burr Oak Littleleaf Linden SIZE CONTAINER QTY REMARKS 6' Hgt. B&B 6' Hgt. B&B 2.5" Cal. B&B 2.5" Cal. B&B 3" Cal. B&B 2.5" Cal. B&B 8' Ht. B&B 2.5" Cal. B&B 2.5" Cal. B&B 5" Cal. B&B 2.5" Cal. B&B 3.75" Cal. B&B 3.75" Cal. B&B 3.75" Cal. B&B III 5 1-1 5 Calculated as 2.5" Cal. Calculated as 2.5" Cal. 2 3 Clump Form 3 3 5 2 4 2 5 Cr Cornus albs ' Regnzam' Red Gnome Dogwood 3 gal. Pot 14 0 Sd2 Sedum x ' Dazzleberry' Dazzelberry Stonecrop 1 gal. Pot 23 X f G) Sa Spiraea x bumalda Anthony Waterer' Anthony Waterer Spiraea 3 gal. Pot 31 OSm Syringa meyeri ' Palibin' Dwarf Korean Lilac 3 gal. Pot 47 0 Tt Taxus x media 'Tauntonii' Tauton Yew 3 gal. Pot 21 0 Vb Viburnum trilobum 'Bailey Compact' Compact American Cranberry Bush 3 gal. Pot 35 ANNUALS/PERENNIALS 0- Aa2 Astilbe x arendsii 'Amethyst' Amethyst Astilbe 1 gal. Pot 36 O Ep Echinacea purpurea Purple Coneflower 1 gal. Pot 21 OHo Hemerocallis x 'Stella de Oro' Stella de Oro Daylily 1 gal. Pot 60 0 Hp Heuchera macrantha 'Palace Purple' Palace Purple Coral Bells 1 gal. Pot 53 Ox Hg Hosta x 'Guacamole' Guacamole Hosta 2 gal. Pot 29 r� Hx Hosta x 'T-Rex' T-Rex Hosta 2 gal. Pot 9 <; X < Ms3 Matteuccia struthiopteris Ostrich Fern 1 gal. Pot 7 E X 3 Nw Nepeta x faassenii 'Walkers Low' Walkers Low Catmint 1 gal. Pot 51 GRASSES Ck Calamagrostis x acutiflora 'Karl Foerster' Feather Reed Grass 1 gal. Pot 69 LANDSCAPE DETAILS, NOTES AND SCHEDULES: Native Seeding Schedule: Native Seed Type 'A' in basin area (side -slopes) shall be: MnDOT #35-221 Dry Prairie General, worked into the topsoil layer at 36.50 Ibs per acre. Submit seed mix for approval. Grading and Erosion Control per Civil Plans and Specifications Add an additional 10.00 Ibs per acre of MnDOT #21-111 Oats Cover Crop to mix below. 35-221 Dry Prairie General Common Name Scientific Name Rate (lblac) Rate (kg/ha) % Mix w (by weight) Seeds/ sq ft side -oats grama Bouteloua curti endula 3.00 3.36 8.22 % 6.61 little bluestem Schizachyrium sco arium 3.00 3.36 8.22 % 16.53 nodding wild rye E/ mus canadensis 1.00 1.12 2.74% 1.91 kalm's brome Bromus kalmii 0.73 0.82 2.00 % 2.14 big bluestem Andro 0 on gerardii 0.70 0.78 1.92 % 2.57 Indian grass Sor hastrum nutans 0.70 0.78 1.92 % 3.09 blue grama Bouteloua gracilis 0.50 0.56 1.37 % 7.35 junegrass Koeleria macrantha 0.25 0.28 0.69 % 18.37 prairie dropseed S orobolus heterole is 0.12 0.13 0.34 % 0.73 Grasses Subtotal 10.00 11.21 27.42% 59.30 black-eyed Susan Rudbeckia hirta 0.31 0.35 0.84% 10.32 purple prairie clover Dales purpurea 0.19 0.21 0.51% 1.02 hoary vervain Verbena stricta 0.13 0.15 0.34 % 1.29 lead plant Amor ha canescens 0.09 0.10 0.26% 0.42 blue giant hyssop A astache foeniculum 0.06 0.07 0.17% 2.07 butterfly milkweed Asclepias tuberosa 0.06 0.07 0.17% 0.10 Canada milk vetch Astragalus canadensis 0.06 0.07 0.18% 0.40 bird's foot coreopsis Coreopsis pa/mata 0.06 0.07 0.16% 0.21 white prairie clover Dalea candida 0.06 0.07 0.15% 0.39 Canada tick trefoil Desmodium canadense 0.06 0.07 0.18 % 0.13 stiff sunflower Helianthus pauciflorus 0.06 0.07 0.17% 0.09 wild bergamot Monarda fistulosa 0.06 0.07 0.15% 1.42 stiff goldenrod Oligoneuron rigidum 0.06 0.07 0A5% 0.83 large -flowered beard tongue Pensternon grandiflorus 0.06 0.07 0.17% 0.32 smooth aster S m h otrichum laeve 0.06 0.07 0.17% 1.26 rough blazing star Liatris as era 0.04 0.04 0.12% 0.25 gray goldenrod Solids o nemoralis 0.04 0.04 0.10% 1 3.86 heath aster Symphyorrichum ericoides 0.04 0.04 0.10% 2.58 Forbs Subtotal 1.50 1.68 4.09% 2S.96 Oats Avena sativa 25.00 28.02 68.49% 11.13 Cover Crop Subtotal 25.00 1 28.02 68.49% 11.13 Total 1 36.50 1 40.91 100.00% 97.39 Purpose: General dry prairie mix for native roadsides, ecological restoration, or conservation program plantings. Planting Area: Tallgrass Aspen Parklands, Prairie Parkland, and Eastern Broadleaf Forest Provinces. MnIDOT Districts 2(west), 3B, 4, Metro, 6, 7 & 8. Native Seed Type'B' in basin bottom area (intermixed w/ prairie plugs) shall be: MnDOT #35-241 Mesic Prairie General, worked into the topsoil layer at 36.50 Ibs per acre. Submit seed mix for approval. Grading and Erosion Control per Civil Plans and Specifications. Add an additional 10.00 Ibs per acre of MnDOT 21-111 Oats Cover Crop to mix below. 3F.2d1 Meei, Prairie r:eneral Common Name Scientific Name Rate (Iblac) Rate (kg/ha) of Mix (by weight) Seedsl sq ft big bluestem Andro 0 on gerardii 2.00 2.24 5.48% 7.35 Indian grass Sor hastrum nutans 2.00 2.24 5.48% 8.82 side -oats grama Bouteloua curti endula 1.60 1.79 4.39 % 3.53 little bluestem Schizachyrium sco arium 1.60 1.79 4.39 % 8.82 nodding wild rye EI mus canadensis 1.17 1.31 3.20 % 2.23 slender wheatgrass EI mus track caulus 1.00 1.12 2.73 % 2.53 kalm's brome Bromus kalmii 0.50 0.56 1.37% 1.47 prairie dropseed Sporobolus heterolepis 0.07 0.08 0.18 % 0.39 switchgrass Panicum virgatum, 0.06 0.07 0.17% 0.32 Grasses Subtotal 10.00 11.21 27.39 % 35.46 black-eyed Susan Rudbeckia hirta 0.31 0.35 0.86 % 10.56 purple prairie clover Dales purpurea 0.19 0.21 0.51% 1.03 Early Sunflower Helfo sishelianthoides 0.13 0.15 0.34% 0.29 blue giant hyssophysE2p A astache foeniculum 0.06 0.07 0.15% 1.82 lead plant Amor ha canescens 0.06 0.07 0.15% 0.25 Canada milk vetch Astragalus canadensis 0.06 0.07 0.17% 0.39 white prairie clover Dalea candida 0.06 0.07 0.17% 0." Canada tick trefoil Desmodium canadense 0.06 0.07 0.18 % 0.13 stiff sunflower Helianthus pauciflorus 0.06 0.07 0.17% 0.09 wild bergamot Monarda fistulosa 0.06 0.07 0.17% 1.61 stiff goldenrod Oli oneuron ri idum 0.06 0.07 0.17% 0.94 smooth aster S m h otrichum laeve 0.06 0.07 0.17% 1.26 hoary vervain Verbena stricta 0.06 0.07 0.17% 0.64 olden alexanders Zizia aurea 0.06 0.07 0.15% 0.23 common milkweed Ascle ias s riaca 0.04 0.04 0.10% 0.06 butterfly milkweed Ascle ias tuberosa 0.04 0.04 0.10% 0.06 blue vervain Verbena hastata 0.04 0.04 0.12 % 1.50 rough blazing star Liatris aspera 0.03 0.03 0.08 % 0.18 great blazing star Liatris pycnostachya 0.03 0.03 0.09 % 0.13 heath aster Symphyotrichum ericoides 0.03 0.03 0.09% 2.30 Forbs Subtotal 1.50 1.68 4.11 % 23.89 Oats Avena sativa 25.00 28.02 68.50 % 11.14 cover Cro Subtotal 25.00 28.02 68.50% 111.14 Total 1 36.50 1 40.91 1 100.00 % 1 70.49 Purpose: General mesic prairie mix for native roadsides, ecological restoration, or conservation program plantings. Planting Area: Tallgrass Aspen Parklands, Prairie Parkland, and Eastern Broadleaf Forest Provinces. Mn/DOT Districts 2(west). 3B, 4, Metro, 6. 7 & 8. Prairie Plugs Schedule: Plug Spacing: Scientific Name Common Name Size Root 24" On -Center Bolboschoenus fluviatius River Bullrush FLAT PLUG Calamagrostis canadensis Blue Joint Grass FLAT PLUG (Provide a random Carex pellita Wooley Sedge FLAT PLUG and equal mixture of the plants listed) Carex bebbi Bebb's Sedge FLAT PLUG Carex vulpinoidea Fox Sedge FLAT PLUG Carex comosa Bottle Brush Sedge FLAT PLUG Carex lacustris Lake Sedge FLAT PLUG Carex stricta Tussock Sedge FLAT PLUG Juncus effusus Common Rush FLAT PLUG Scirpus atrovirens Green Bulrush FLAT PLUG Scirpus cyperinus Woolgrass FLAT PLUG Spartina pectinata Cord Grass FLAT PLUG Seeding Maintenance for Native Grass and Forb Mixtures: Native Grass and Forb Mixtures (mixtures beginning with the number 3) Year Establishment (spring seeding): 1) Prepare site - Late April - May. 2) Seed - May 1 -June 1. Maintenance: 1) Mow (6-8 inches) - every 30 days after planting until September 30. 2) Weed Control - mowing should help control annual weeds. Spot spray thistles etc. Establishment (fall seeding): 1) Prepare site - Late August - early September. 2) Seed - late September to freeze-up. Maintenance (following season): 1) Mow (6-8 inches) - once in May, June and July. 2) Weed Control - mowing should keep annual weeds down. Spot spray thistles etc. Evaluation: 1) Cover crop growing within 2 weeks of planting (except dormant plantings) 2) Seedlings spaced 1-6 inches apart in drill rows. 3) Native grass seedlings may only be 4-6 inches tall. 4) If there is a flush of growth from foxtail etc., mow as necessary. Year Maintenance: 1) Mow (6-8 inches) one time between June 1 - August 15 before weeds set seed. 2) Weed Control - mowing should keep annual weeds down. Spot spray thistles etc 3) Some sites may not require much maintenance the second year. Evaluation: 1) Cover crop will be gone unless winter wheat was used in a fall planting. 2) Grasses forming clumps 1-6 inches apart in drill rows, but still short. 3) Some flowers should be blooming (black-eyed Susans, bergamot etc.). 4) If there is a flush of growth from foxtail etc., mow site. Year 3 Maintenance: 1) Mow only if necessary. 3) Weed Control - Spot spray thistles, etc. 4) Sites usually do not require much maintenance the third year. Evaluation: 1) Planting should begin looking like a prairie - tall grasses, flowers etc. Long-term Maintenance: 1) Weed Control - Spot spray thistles etc. 2) Burning (3-5 year rotation) altemate spring and fall if possible. 3) Haying (3-5 year rotation) late summer or early fall. Alternate with burning (may substitute for burning). 4) Burning two years in a row will really "clean up" rough -looking sites. Seeding Installation Method: Method 1. Drop Seeding Onto Tilled Sites This is the "standard" method for seeding on prepared sites such as those on construction projects. A) Site Preparation - The site should be prepared by loosening topsoil to a minimum depth of 3 inches. B) Fertilizer- Use a fertilizer analysis based on a soil test or a general recommendation is a 10-10-10 (NPK) commercial grade analysis at 200 Ibs/acre. C) Seed Installation - Seed should be installed with a drop seeder that will accurately meter the types of seed to be planted, keep all seeds uniformly mixed during the seeding and contain drop seed tubes for seed placement (Brillion -type). The drop seeder should be equipped with a cultipacker assembly to ensure seed -to -soil contact. D) Seeding Rates . Rates are specified in the mixture tabulation for the specked mix. E) Packing - If the drop seeder is not equipped with a cultipacker, the site should be cultipacked following the seeding to ensure seed -to -soil contact. F) Mulch - The site should be mulched and disc -anchored following cultipacking. The standard mulch is MNDOT Type 1 at a rate of 2.0 tons/acre. Also see temporary erosion control for additional information. Existing Tree Inventory Schedule: Survey ID Plan ID Common Name Botanical Name Caliper Significant? Remove? Notes: 5706 1 COTTONWOOD POPULUS 17 Y Y 5705 2 COTTON WOOD POPULUS 14 Y Y 5704 3 COTTONWOOD POPULUS 12 Y Y 5702 4 COTTONWOOD POPULUS 10 N Y 5703 5 COTTONWOOD POPULUS 10 N Y 5701 6 COTTON WOOD POPULUS 21 Y Y 6544 7 COTTONWOOD POPULUS 24 Y Y 6529 8 HAWTHORN CRATAEGUS 6 N Y 6519 9 HAWTHORN CRATAEGUS 8 N Y 8004 10 HAWTHORN CRATAEGUS 6 N Y 8006 11 HAWTHORN CRATAEGUS 6 N Y 7987 12 HAWTHORN CRATAEGUS 6 N Y 7988 13 HAWTHORN CRATAEGUS 6 N Y 5671 14 HAWTHORN CRATAEGUS 4 N Y 5670 15 HAWTHORN CRATAEGUS 4 N Y 6495 16 WILLOW SALIX 24 N Y DEAD 6494 17 WILLOW SALIX 18 N Y DEAD 6492 18 COTTONWOOD POPULUS 33 Y Y 6481 19 COTTON WOOD POPULUS 24 Y Y 6482 20 COTTONWOOD POPULUS 24 Y Y 6483 21 COTTON WOOD POPULUS 30 Y Y 6484 22 COTTON WOOD POPULUS 24 Y Y 6485 23 COTTON WOOD POPULUS 18 Y Y 6486 24 COTTONWOOD POPULUS 30 Y Y 6488 25 HAWTHORN CRATAEGUS 8 N Y 6487 26 COTTON WOOD POPULUS 27 Y Y 6466 27 HAWTHORN CRATAEGUS 6 N Y 6465 28 HAWTHORN CRATAEGUS 6 N Y 6464 29 COTTONWOOD POPULUS 16 Y Y 6463 30 COTTONWOOD POPULUS 30 Y Y 6462 31 COTTONWOOD POPULUS 20 Y Y 6460 32 COTTONWOOD POPULUS 21 Y Y 6461 33 ASH FRAXINUS 20 N Y DISEASE 6459 34 COTTONWOOD POPULUS 12 Y Y 6458 35 COTTONWOOD POPULUS 18 Y Y 6457 36 ASH FRAXINUS 24 N Y DISEASE 6456 37 COTTONWOOD POPULUS 28 Y Y 6455 38 ASH FRAXINUS 20 N Y DISEASE 6441 39 COTTON WOOD POPULUS 33 Y Y 6442 40 COTTONWOOD POPULUS 36 Y Y 5627 41 SPRUCE PICEA 10 Y Y 5632 42 SPRUCE PICEA 7 Y Y 5639 43 SPRUCE PICEA 9 Y Y 5657 44 COTTON WOOD POPULUS 24 Y Y 5658 45 COTTON WOOD POPULUS 18 Y Y 5665 46 COTTONWOOD POPULUS 24 Y Y 7991 47 COTTONWOOD POPULUS 15 Y Y 7982 48 COTTONWOOD POPULUS 15 Y Y 7981 49 COTTONWOOD POPULUS 15 Y Y 7980 50 COTTONWOOD POPULUS 15 Y Y 7979 51 COTTON WOOD POPULUS 12 Y Y 7978 52 COTTON WOOD POPULUS 12 Y Y 7996 53 COTTON WOOD POPULUS 15 Y Y 6504 54 COTTON WOOD POPULUS 33 Y Y 6503 55 COTTON WOOD POPULUS 24 Y Y 7998 56 COTTON WOOD POPULUS 12 Y Y 7999 57 COTTONWOOD POPULUS 12 Y Y 6505 58 COTTONWOOD POPULUS 10 N Y 6502 59 COTTONWOOD POPULUS 30 Y Y 6506 60 COTTONWOOD POPULUS 27 Y Y 6511 61 COTTON WOOD POPULUS 33 Y Y 6510 62 COTTON WOOD POPULUS 20 Y Y 6522 63 COTTON WOOD POPULUS 33 Y Y 6499 64 COTTON WOOD POPULUS 24 Y Y 6475 65 COTTONWOOD POPULUS 33 Y Y 8033 N N Caliper Inches Al Total Tree Inches on Property 1,188 Total Existing Significant Inches 984 Total Significant Inches Removed 984 10% Permittal Removal 98 Net Proposed Removal 886 Significant Tree Inches Preserved 0 Replacement Inches Required* 443 Replacement Inches Proposed 48 Remaining Mitigation Inches Owed 395 a Q 9. O xq� � 0 :g L ` �ro (D d a Z V_ o a� Q > N y rn Marc �O'cS2 dam 00Jml1 sinW-M m .n 10 m� U w� ~ s� w OU m =Z,=„a Z C7 z wa Z m Z �= o O ~ i= UXMn ¢ =� n cc K= W M W z �m0w g w=�aa ream o- avcw,aua- w w . . O H N aU Ozm lY O ¢ O z a ¢ N UD00 � i00powMo wQ UmZ+f 0 ■ Ito N CC Z N 1.0 Lfi ■► N_ W Q � W� j� Q~ O N N <Z YZ 0 0. Wwa aLU o Z N C4 In De w W J o E J > v W N Df un g XIM 2022 V 2 a) E r_ ICU N (6 O U) LL C: co C: C: cli co -_ O 2 N N Co J Q 1922 LANDSCAPE DETAILS, NOTES,& SCHEDULES L104 LAKE JOHANNA FIRE DEPARTMENT 5545 LEXINGTON AVENUE NORTH • SHOREVIEW, MN 55126 ZPAP OFFICE (651) 415-2100 • FAX (651) 486-8826 May 30, 2024 Honorable members of the Arden Hills City Council and Planning Commission 1245 W Highway 96 Arden Hills, MN 55112 RE: Land use applications for the proposed Lake Johanna Fire Department Headquarters Station Honorable members, Please accept this letter from the Lake Johanna Fire Department Board of Directors requesting your support for the land use applications for the LJFD headquarters station project. The seven - member board of directors is comprised of members from the cities of Arden Hills, North Oaks, and Shoreview as well as three members of the LJFD fire department. The need for this station was determined through a long-range planning study in 2018 which found that the department is lacking sufficient training, administrative, and operating space, and that response times in southern Arden Hills and Shoreview are slower due to the current station 140 location on Victoria Street in Shoreview, directly north of a rail line, effectively cutting off response times. The proposed location for this new facility is ideal as it improves access for emergency vehicles and improves response times to the service area. This project is a high priority for each of the three cities as it provides necessary lifesaving resources to serve the community. The funding for this important project will primarily be through local tax dollars. The estimated cost is $23,000,000; an allocation from the State of Minnesota of $6,370,000 has been committed as they recognize the regional importance of this facility. Applications have been made for federal funding which will be determined sometime in 2024. The remaining costs will be paid for by the cities as allocated by the funding calculation. Due to the significant impact on tax payers, it is requested that the City of Arden Hills waive any possible fees, especially park dedication fees as this use will not add any burden to the Arden Hills parks and trails system. Any reduction in fees is a direct reduction to tax payers. It is the request of the LJFD Board of Directors that the Planning Commission and City Council consider this review necessary public infrastructure and that you provide your highest level of support for such an important and impactful public use. SERVING 0 ARDEN HILLS • NORTH OAKS • SHOREVIEW 0 SINCE 1943 Sincerely, Tena Monson, Board President SERVING • ARDEN HILLS • NORTH OAKS • SHOREVIEW • SINCE 1943 -AIt�EN HILLS City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 PRELIMINARY ENGINEERING REVIEW MEMORANDUM Date: June 27, 2024 To: Jessica Jagoe, Community Development Director From: David Swearingen, P.E. Public Works Director / City Engineer Subject: Lake Johanna Fire Department HQ — Preliminary Engineering Plan Review This memorandum summarizes a preliminary engineering review comments for the Preliminary Plat of 2 Pine Tree North dated 02/05/2020 and the civil construction plans for the Lake Johanna Fire Department HQ Development dated 03.31.2022 prepared by Buetow 2 Architects, Inc. and Larson Engineering, Inc. A more thorough technical review of the site development plans will be prepared after the applicant provides a formal "City Submittal". GENERAL COMMENTS 1. A Grading and Erosion Control Permit from the City of Arden Hills will be required. 2. A permit from Rice Creek Watershed District will be required. Please submit a copy of approved permit to the City of Arden Hills. 3. A Sewer Permit is required before modification to the existing sanitary sewer structure. 4. A Water Permit is required before modification to the existing watermain. 5. A Right of Way Permit from the City is required for any work within the easement. 6. Provide the Stormwater Management Report. 7. Provide operations and maintenance plans/procedures for the stormwater facilities. 8. Plans to be reviewed by the Fire Marshal. 9. Update City detail plates, coordinate with the City Engineer. 10. Verify the submitted plat is current. 11. Review northern driveway access distance as it relates to the existing driveway access from the property to the north. 12. Review southern driveway access to better align with the driveway access across Pine Tree Dr. if possible. 13. Consider additional signage to delineate employee parking area from fleet driveway space. 14. Provide vehicle turning paths for review by the City Engineer. 15. Construction equipment staging and traffic shall not significantly impact Pine Tree Drive or any Public roadway. GRADING AND EROSION CONTROL 1. City inspector may request additional or modifications to BMPs as needed during construction. UTILITIES 1. Utilities to be installed using the City of Arden Hills Design Standards. 2. City tracer wire specifications will be required for water/sewer services. 3. A detailed work plan will be required prior to the City authorizing connection to the 16" diameter water main within Pine Tree Drive due to the critical function of this water main. 4. Proposed extensions of water main and sanitary sewer constructed shall be private utility services. Public utility easements will not be required over private water and sanitary sewer utilities within the site. 5. Install plug on newly constructed sanitary at the connection point to the existing sanitary structure. Plug may be removed once the sewer has been tested, approved by the inspector, and cleaned of debris. 6. Callout emergency overflow for ponds and wetlands. 7. Adjust catch basin impacted by the southern driveway access at the southern tie-in. HARD SURFACE 1. Repair all street pavement, striping and curb damaged during construction. 2. All City pavement sections disturbed must be replaced to existing conditions with like materials and approved mix designs by the City Engineer. The applicant should respond in writing as to how the above comments will be addressed. To: David Swearington, Lucas Miller, and Jessica Jagoe From: Derrik Mills cc: Tina York Date: 7/08/24 Re: 3535 Pine Tree Dr. Lake Johanna Fire Department HQ Traffic Study Determination Attn, Based on the Ramsey County Public Work's Local Government Development Guide, a traffic impact study is required when a proposed development generates 100 peak hour trips or 1000 total daily trips. The proposed project is a 41,000 square -foot building that will serve as a fire station, replacing the existing Fire Station 4, and headquarters for the department. Using the land use code for a Fire and Rescue Station (575) from the Institute of Transportation Engineers (ITE) Trip General Manual, 111" Edition, it is estimated that there will be 20 PM peak hour trips (6 inbound trips and 14 outbound trips). The ITE Trip Generation Manual does not have rates in the AM peak hour. It is estimated that this project will not generate more than 100 peak hour trips and a traffic impact study is not required. PC AGENDA ITEM — 3A ,-AI�EN�HILLS MEMORANDUM DATE: July 10, 2024 TO: Planning Commission Chair and Commissioners FROM: Jessica Jagoe, Community Development Director SUBJECT: Planning Case #24-009 — Public Hearing Required Applicant: Lake Johanna Fire Department Property Location: 3535 Pine Tree Drive Request: Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit and Site Plan Review Requested Action Lake Johanna Fire Department ("The Applicant") is requesting a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review for a proposed project on 3535 Pine Tree Drive ("Subject Property"). The proposal consists of construction of a 41,000 square foot Headquarters Fire Station facility that will house administrative staff as well as a response crew and includes training facilities for the Department. Background 1. Overview of Request The Applicant has submitted a land use application for Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review, proposing to develop a 3.7-acre site located at 3535 Pine Tree Drive. The Subject Property is currently owned by the Applicant. The Applicant is proposing to build a two-story fire station Headquarters facility of approximately 41,000 square feet with a training facility and training tower. The Lake Johanna Fire Department provides public fire and medical emergency response services to the Cities of Arden Hills, North Oaks, and Shoreview. The Applicant currently operates out of three stations, the proposed project would replace Station 4 located at 3615 Victoria Street in Shoreview and become the Headquarters for the Department. The Applicant is planning for construction of the new Headquarters facility to begin in 2025. The Headquarters Fire Station facility will consists of offices for five (5) full time staff members that would maintain typical Monday through Friday 8 to 5 business hours. The fire station will have a crew of three (3) Firefighters on duty 24/7 to respond to fire and emergency medical service (EMS) calls. 2. History of the Subject Property Page 1 of 15 In 2013, Bethel University purchased the property at 2 Pine Tree Drive to use the existing office building for higher education. This location is known as the Anderson Center campus. In 2020, Bethel University subdivided the approximate 43 acre site into three (3) parcels known as the 2 Pine Tree North plat. The Applicant purchased Lot 2 Block 1 of that plat in 2020. The other lot as part of this plat is now the location of New Perspective Senior Living. During the platting process, the Applicant was conducting their due diligence on the potential for acquiring the Subject Property. In 2018, the Applicant had completed a study that determined the need for a new Fire Station to be built on a site that could support the communities and their needs over "the next 50 years". It was determined that at a minimum the Department needed at least three (3) acres. This study also noted the future Fire Station should include six (6) drive through bays and living/sleeping quarters. The new Fire Station would then because of size and equipment housed would transition to become the new Headquarters Station and include necessary operational and training functions. The Department is currently overseen by a Board of Directors, the Board ("Board") consists of City representatives (one (1) Arden Hills rep, one (1) North Oaks rep, and two (2) Shoreview reps) and three (3) members from the Department. The Board is responsible for an array of Page 2 of 15 duties, such as, reviewing policies, approving long range plans and approving operating and capital budgets. In 2021, the Cities of Arden Hills, North Oaks, and Shoreview entered into a Joint Powers Agreement (JPA) for the purposes of acquiring and constructing improvements on property that was to be identified for the new Headquarters. The Applicant purchased the Subject Property in 2021 due to the location being ideal to improve access for emergency vehicles and improve response times to the service area. As part of the land use application, the Applicant has included a letter of support from the Board for advancement of this project to meet the service needs of the public. It is agreed upon as part of the JPA that the Applicant will transfer ownership of the Subject Property to the Lake Johanna Fire Department Headquarters JPA. Approvals 1. Planned Unit Development A Planned Unit Development (PUD) is required for all new development and redevelopment in the B-2 Zoning District. In addition, a PUD would allow for performance standard flexibility. This proposal involves both the initial Master Plan PUD and the Final PUD. Architectural Plan 2. Conditional Use Permit In the B-2 Zoning District, a Conditional Use Permit (CUP) is required for Public Use. The Cities of Arden Hills, North Oaks, and Shoreview contract with the Lake Johanna Fire Department to provide emergency response services for Fire and EMS calls to the public. The City refers to the Lake Johanna Fire Department in the 2040 Comprehensive Plan under Chapter 13, Public Facilities, Services, and Infrastructure. A conditional use is allowed if the landowner meets the general and specific standards set forth in the zoning ordinance. City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a Conditional Use Permit. The Planning Commission and City Council should consider the effect of the proposed use upon the health, safety, convenience and general welfare of the owners and occupants of the surrounding land and the community, in general, including but not limited to the following factors: Existing and anticipated traffic and parking conditions; The Applicant has provided as part of their submission a site plan of adjacent roads to identify fire response vehicle travel patterns will be north on Pine Tree Drive to the nearby controlled intersections. The Applicant has stated that the only exception to this northerly route will be to respond to emergencies in the Hunters Park Condos, Hunters Park neighborhood, or Catholic United building. Their narrative states that traffic pre- emption will control the nearby intersections for the emergency vehicle, making it safer for the firefighters and the public. Page 3 of 15 The Headquarters facility will consists of offices for five (5) full time staff members and would maintain typical Monday through Friday 8 to 5 business hours. The fire station will have a crew of three (3) Firefighters on duty 24/7 to respond to fire and EMS calls. The use of the facility for the 24/7 staffing of station crew is not anticipated to generate enough consistent traffic during peak or non peak hours to require any traffic control changes. A traffic study was not prepared as part of the application and may be waived by the City Council as part of the PUD. The Applicant has stated that based on their current call volume, they anticipate that this station would respond to around 2, 000 calls annually. The Consultant Engineer for the City has stated "it is not estimated that this project will generate more than 100 peak hour trips and a traffic study is not required. " 2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, and other nuisance characteristics; The narrative states that fire trucks leaving the station to respond to emergency calls will turn on their flashing emergency lights which will capture the traffic signal at Pine Tree and County Road E. After pulling forward out of the station, trucks will make a left turn to the north on Pine Tree Drive. As they approach County Road E, they will activate their sirens, and turn to the west or east as needed. 3. Drainage; The proposed site plan does not negatively impact drainage on adjacent properties and the Applicant has stormwater management onsite that is intended to meet the quantity and quality standards. The Application is currently being reviewed by the Public Works Director/City Engineer and will go through the Rice Creek Watershed approval process. 4. Population density; The Subject Property is guided as Community Mixed Use (CMU) in the 2040 Future Land Use Plan. The area is designated for a broad range of retail, shopping, services, and office space to meet the needs of the community and surrounding areas. The expected share of uses within this area are as follows: 10% to 50% Light Industrial; 10% to 70% Retail; 10% to 70% Office; and 10% to 50% Residential. A development intensity of up to 0.8 FAR maybe allowed. The Applicant is proposing a two-story 41, 000 square foot building that equals 0.25 FAR on the Subject Property. 5. Visual and land use compatibility with uses and structures on surrounding land; The proposed building materials will meet the B-2 preferred material requirement as identified in the Design Standards. The Architect for the project notes that a cantilevered canopy visually announces that this is the public entrance to the facility and the site features a plaza and flag display at the entry for visual structures. The Applicant has stated in their narrative that historically Fire Departments are very good neighbors and that two of the other stations are adjacent to residential land uses, schools and day cares. 6. Adjoining land values; The proposed development is not anticipated to negatively impact adjacent property values. 7. Park dedications where applicable; The Development Agreement for the 2 Pine Tree North plat indicated that Park Dedication required for Lots 1 and 2 will be determined by the City at the time of future development and will be memorialized in development agreements for those lots. The Page 4 of 15 Applicant as part of this application is requesting the City waive the Public Use Dedications including the Park Dedication Fee. As part of their submittal, the Board has provided a letter of support for the Applicant's request. The Applicant and Board have received State of Minnesota funding for this project and applications have been made for federal funding. Funding for this Lake Johanna Fire Department Headquarters Station will primarily be through local tax dollars. 8. Orderly development of the neighborhood and the City within the general purpose and intent of the Zoning Code and the Comprehensive Development Plan for the City. The Lake Johanna Fire Department Headquarters Fire Station proposed facility at 3535 Pine Tree Drive is consistent with the purpose and intent with the policies within the City's Comprehensive Plan, the B-2 Zoning District and Guiding Plan for the B-2 District. Plan Evaluation Chapter 13, Zoning Regulations Review 1. District Provisions (B-2 General Business District) — Section 1320 — Meets Requirements Under the 2040 Comprehensive Plan, this site is guided as Community Mixed Use (CMU) on the land use plan and is zoned B-2 General Business District. Direction 2040 Comp. Plan Land Use Zoning North CMU — Community Mixed Use B-2 General Business District South CMU — Community Mixed Use B-2 General Business District East CMU — Community Mixed Use & HDR — High Density Residential B-2 General Business District & R-4 Multiple Dwelling District West CMU — Community Mixed Use B-2 General Business District The use for "Public Use" is allowed as a Conditional Use in all residential, commercial, and industrial zoning districts. The proposed site plan is attached as Attachment D. The table below provides the performance standards for the B-2 Zoning District and the preliminary analysis for the fire station: Ordinance Requirements B-2 District Proposed Development Standards Maximum Floor Area Ratio (FAR) 0.8 0.25 Maximum Structure Coverage 45% 18% Minimum Landscape Lot Area 20% 34% Minimum Front Yard Setback 50 feet Approx. 90 feet Minimum Rear Yard Setback 20 feet 136 feet Minimum Side Yard Setback 10 feet (min)/ 85 feet (south) and 68 feet (north)/153 feet 20 feet (total) (total) Minimum Lot Area 13,000 square feet 3.7 acres/161,172 square feet Maximum Building Height 50 feet Headquarters Building — 30 feet Training Tower — 42 feet 2. Design Standards - Section 1325.05 and 1325.055 A. Building Design — Flexibility Requested Page 5of15 Section 1325.05 Subd. 8, E of the Arden Hills City Code states "the arrangement, massing, materials and colors shall work to create a high quality development that is responsive to existing buildings, site features, and site design on adjoining sites in the district." There are seven (7) evaluators for building design with one of those stating that at least fifty percent (50%) of the largest building on each site shall be constructed at the front setback line." The other evaluators to consider in review of the building design are that fagade treatments shall be carried around all sides, avoid long unbroken expanses and to create visual interest from the street, awnings and overhangs shall be provided at the primary entryway, any multi -level building shall distinguish the ground floor level from the upper floors. Architectural plans are included in Attachment E. The Applicant is proposing a two-story building of approximately 41,000 square feet for their Headquarters facility. The front lot line is Pine Tree Drive and the front setback line is at 50 feet. The Applicant's site plan shows the building would be constructed at approximately 90 feet. Site Plan / C7 \ i NEW FIRE n� m� f STATION � C i (Z) PAVING PINE TREE DRIVE B. Exterior Materials — Meets Requirements At least seventy-five (75) percent of the exterior building materials should be made of brick masonry, tile masonry, natural stone or its synthetic equivalent, decorative concrete plank, transparent glass or any combination thereof. Trim and other accent or decorative features may be metal, wood, split faced block, EIFS, or stucco. Metals shall have a matte finish and have visible corner moldings and trim when used on exterior walls. Undesirable materials include simulated brick, vinyl or aluminum siding, sheet or corrugated metal siding, plain concrete blocks or panels, brightly colored metal roofing or canopies, pre -cast tilt -up walls, and mirrored or reflective glass. Building colors shall be muted. Recommended colors include browns, grays, tans, beiges, and dark or muted green, blues, and reds. Bright or brilliant colors and sharply contrasting colors may be used for only accent purposes occupying a maximum of five percent (5%) of building facades. The Planning Commission should evaluate the architectural style and building character based on the quality of its design and on its relationship to its surroundings. Site characteristics to be evaluated for this purpose include, but are not limited to, building and landscaping materials, Page 6of15 colors, textures, shapes, massing, building components, height, roof -line, and setback. A full plan set of building elevations is included as Attachment E. Planning Staff has provided the review below on building materials and transparency as shared by the Applicant in order for the Planning Commission to attain a better understanding of the full scope of their project design. The proposed building complies with building materials consisting of brick, glass, or metal trim on all elevations. The transparency requirements for new developments within the B-2 Zoning District have been considered in the window placement and design for the fire station facility. Section 1325.05, Subd. 8, F. states that fifty percent (50%) of all first level building fagades that front a public street shall be comprised of transparent windows or doors in order to allow views of interior uses and activities. The following table shows the breakdown of materials for the fire station: Required Proposed Other Required Proposed Proposed Preferred Preferred Materials Transparency Transparency Transparency Materials Materials *first level *full elevation East 75% 95% 5% 50% 57% 46% (front) Fagade North 75% 94% 6% N/A 23% 10% Fagade South 75% 97% 3% N/A 5% 4% Fagade West 75% 15% 15% N/A 15% 10% Fagade The buildings design has fagade stepping and a variation in rooflines as viewed from all elevations. The Applicant has noted that they have incorporated many "Green Building" sustainable design features in this project. As noted in the application materials, the Applicant began the efforts for studying the Department needs and designing this project back in 2018. This project is intended to meet their needs for "the next 50 years" and will provide for the administrative, operational (i.e. Headquarters), apparatus bays, and training facility. This facility will be used for classroom and hands-on training both inside the training room and outside. There could be groups ranging from 10-40 firefighters in attendance a few times each week. The four (4) story training tower on the west (rear) side of the building will use non -toxic fire props, theatrical smoke machines and will also be used for ladder training and rope rescue training. The fire station project with the proposed design has received State funding towards future construction. As part of their design process in 2020/21, the Applicant shared schematic "artist's views" of their project plans and renderings with each City Council for feedback. This information was used as part of their due diligence prior to preparation of their project bid documents which have been finalized. The Applicant has submitted to the City for the land use approval prior to applying for construction permits. Page 7of15 Rendering of West (rear) and South Elevations C. Lighting — Meets Requirements The Zoning Code requires exterior lighting to be consistent in type, design, scale, and color to create unity in the Districts. Exterior lighting for parking lots and buildings shall not be excessive and shall be directed at their intended purposes. Any light or combination of lights shall not cast light that exceeds a meter reading of one (1) foot candle on the travel lanes of adjoining public streets or 0.4 foot candles on adjoining residential property. The proposed plan includes LED fixtures for area lights at a maximum of 30 feet to the top of the fixture, a monument sign and flag pole light, and then soffit lighting above the doorways/entry on the building. The proposed lighting is consistent with the use and the surrounding area. The Applicant has submitted a photometric plan that identifies the types of light fixtures and quantities. The Subject Property is not adjacent to a residential property. The photometric plan shows that proposed lighting will not exceed a meter reading of one (1) foot candle on the travel lanes on Pine Tree Drive. As a condition of approval, all lighting shall be downward directed shoebox style with flush lenses. Details about the proposed lighting are found in Attachment F. D. Screening — Meets Requirements Screens and fencing help minimize adverse impacts of public nuisances, such as noise. Trash and recycling equipment, materials, and containers shall be fully enclosed and integrated into the architecture of the buildings. All mechanical equipment, whether roof -mounted or ground - mounted should be integrated into the architecture of the building. It shall be completely screened from the ground -level view of adjacent properties and public streets. There is a generator, electrical transformer, and trash enclosure located on the rear of the building that are screened by the building to the public street. The trash enclosure will feature metal trash enclosure gates and is constructed with brick consistent with the building design. The Page 8 of 15 Applicant did not include roof plans or associated building sections to illustrate all roof -mounted mechanical equipment is screened. Planning staff has included a condition recommending that all rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. E. Landscaping — Flexibility Requested Section 1320.06 — District Requirements Chart of the City Code requires a minimum landscape lot area of 20% or 32,234 square feet for the Subject Property in the B-2 Zoning District. The Applicant is proposing a landscape lot area of approximately 34% percent or 55,835 square feet. Additionally, at least 10% or 3,223 square feet of the total landscaped area (i.e. 32,234 square feet) shall be covered with perennials and/or shrubbery. The Applicant is proposing perennial and/or shrubbery of approximately 9% or 2,926 square feet. Planting islands shall occupy 10% or 2,346 square feet of the parking area (i.e. 23,465 square feet). The plans show the provided planting islands are covering approximately 10.5% or 2,459 square of the parking area. The site contains 984 caliper inches of significant trees. Section 1325.055 Subd. 5 allows for the removal of fewer than ten (10) percent of the caliper inches of significant trees on the property without requiring mitigation. Ten percent of 984 is 98.4 caliper inches. The Applicant proposes removing 984 caliper inches of trees, meaning the Applicant is responsible for mitigation of 886 caliper inches removed above 10 percent. Per Section 1325.055 Subd. 6, the number of caliper inches of trees required for replanting is determined at a rate of 1:2 or one (1) inch replaced for every two (2) inches lost. Existing 10% of Proposed Inches in Required Proposed Existing Removal excess of 10% Replacement Re lacement 984 caliper 98.4 caliper 984 caliper 886 caliper 443 caliper 48 caliper inches inches inches inches inches inches The Applicant is seeking flexibility for the required replacement of 443 caliper inches based on the total inches removed and the rate of replacement due to the need to maintain exiting sightlines for the firefighters when they leave for a call. The Applicant has noted the landscaping plan includes an abundance of plantings and is proposing to plant 48 caliper inches on site. The Applicant's Tree Preservation Plan (Sheet L101) for the landscaping requirements table indicates a proposed 128 caliper inches to be provided. For the purposes of this report, Planning Staff has used the figures as calculated on the Landscaping Details and Notes Plan (Sheet L104) which includes the tree inventory schedule. The Applicant has stated in their narrative that they would be willing to consider an off -site location to satisfy this requirement, but does not have a location identified. They have also requested the City waive the payment in lieu of option (i.e. cost of materials and installation plus 10%) which would be considered as part of the PUD review. The Planning Commission should discuss and provide a recommendation to the City Council as part of this review. The City Code requires a minimum of one (1) tree be provided along the right-of-way of every 40 feet of public street frontage. The proposed development would be required to plant seven (7) trees along Pine Tree Drive which the Applicant has satisfied in their landscaping plan as presented. A landscape plan is included as Attachment H. Page 9of15 Landscape Plan F. Pedestrian and Bicycle Circulation — Meets Requirements Section 1325.05 Subd. 8, P states new building construction shall include construction of a minimum of six (6) foot concrete sidewalk adjacent to or in all right-of-way. In addition, there shall be an internal sidewalk connection linking the primary entrance with the public sidewalk. The Applicant has indicated they will comply with this requirement. The Applicant is not proposing a bicycle rack/bicycle parking as part of this development. City Code Section 1325.05 Subd, 8, Q applies to commercial uses and requires one (1) space for every 20 parking spaces. 3. Off -Street Parking Standards - Section 1325.06 A. Parking Setbacks — Meets Requirements The City Code requires off-street parking spaces to be located a minimum of 20 feet from the right- of-way of any public street and five (5) feet from any side or rear lot lines. The Applicant has satisfied these requirements with the site plan as presented. B. Number of Parking Stalls — Recommendation Requested Per City Code 1325.06, there are general categories that determine the number of parking spaces that would need to be provided. Public Use is listed under the category of "Uses Not Specifically Noted Including Public Uses — As Determined by the City Council after recommendation by Planning Commission". The Applicant is proposing 54 parking stalls. As noted in their narrative, the Headquarters facility will generally have five (5) full time staff members that would maintain typical Monday through Friday 8 to 5 business hours. The fire station will have a crew of three (3) Firefighters on duty 24/7 to respond to fire and emergency medical service (EMS) calls. In addition, this facility will be used for classroom and hands-on training with groups ranging from 10-40 firefighters in attendance a few times each week. The Applicant seeks a recommendation from the Planning Commission to the City Council for approval of the parking plan as presented. Page 10 of 15 C. Driveways — Review Requested Within the parking requirements, the City has a standard for the maximum driveway width for residential and commercial, but not public use. As an example for commercial, the maximum driveway width is 32 feet on City streets. The Applicant is proposing two (2) driveway accesses along Pine Tree Drive. The southerly access is proposed to be 117 feet and the northerly access is proposed to be 28 feet. Additional comments may be identified upon completion of the review by the Public Works Director/City Engineer. However, one initial comment from the Consultant Engineer was the spacing between Bethel's main entrance and the proposed employee entrance should be reconsidered to provide more spacing. 4. Sign Code — Section 1240.02 A. Freestanding Signs — Verification Needed The Subject Property is located in Sign District 7. Properties in Sign District 7 are allowed one (1) freestanding sign measuring up to 25 square feet in copy area and not exceeding eight (8) feet in height. Freestanding signs shall be located at least five (5) feet from any property line. Sign copy area is defined as the area in square feet of the smallest rectangle, circle, or triangle that contains the sign copy. The Applicant is proposing a monument sign along Pine Tree Drive as shown on the site plan in compliance with setbacks requirements. The proposed externally illuminated freestanding sign is five (5) feet in height and has a total sign copy area of 36 square feet as shown on the sign illustration including logo and text, not address information. Also, the total area of a freestanding sign shall not exceed 1.5 times the permitted sign copy area of said sign which would be 37.5 square feet for this application. The Applicant has indicated the proposed freestanding sign has a total area of 30 square feet (60 inches tall by 72 inches wide). The Applicant shall confirm the monument sign dimensions as part of the Planning Commission review since the proposed copy area exceeds the total sign area as stated in the application materials. Sign materials are noted to be consistent with building materials. The sign plan is shown in Attachment G. B. Wall Signs — Meets Requirements Properties in Sign District 7 are allowed wall signs up to 45 square feet. The Applicant is proposing two (2) non illuminated totaling 28 square feet of wall signs to be located on the east and west elevations at the apparatus bays. The sign plan is shown in Attachment G. Page 11 of 15 5. Section 1355.04 Procedural Requirements for Specific Applications A public hearing for a CUP and PUD request is required before the request can be brought before the City Council. The applicant or its representative shall be given the opportunity to appear before the Planning Commission to answer questions or give explanations regarding the proposal. Upon completion of the public hearing and its study and consideration of the application, the Planning Commission shall submit its written report, containing its findings, conclusions, and recommendations as to the application, to the City Council. Plan Evaluation Summary The table below provides the performance standards for the B-2 Zoning District and the preliminary analysis for the proposed development: Ordinance Re uireme B-2 District Standards Proposed Development Maximum Floor Area Ratio (FAR) 0.8 0.25 Maximum Building Height 50 feet Headquarters Building — 30 feet Training Tower — 42 feet Maximum Structure Coverage 45% 18% Minimum Landscape Lot Area 20% 34% Minimum Front Yard Setback 50 feet Approx. 90 feet Minimum Rear Yard Setback 20 feet 136 feet Minimum Side Yard Setback 10 feet (min)/ 85 feet (south) and 68 feet 20 feet (total) (north)/153 feet (total) Building Design - Positioning At Front Setback = 50 feet Building = Approx. 90 Minimum Parking Requirements Public Use - 54 Parking Stalls Recommendation from PC Off -Street Parking Setbacks 20 feet from ROW/5 feet West (rear) — 46 feet from side & rear lot lines South (side) — 65 feet North side — 20 feet Building Fagade Transparency 50% transparency at front Meets Requirements Building Materials 75% brick, tile, natural Meets Requirements stone, decorative concrete, transparent glass or any combination thereof Lighting/Photometric Plan Meter reading of no more Meets Requirements than one (1) foot candle on the travel lanes Screening Trash Enclosure Meets Requirements Landscaping Perennial/Shrubs/Planting Seeking Flexibility Islands Landscaping Replacement Trees Seeking Flexibilit Landscaping Boulevard Trees - 7 Meets Requirements Pedestrian and Bicycle Circulation 6 foot sidewalk & Bike Meets Requirements Rack Freestanding Sign — Copy Area 25 square feet To be verified Freestanding Sign — Total Sign Area 37.5 square feet To be verified Wall Signage Sign District 7 28 square feet (Max. 45 square feet) Additional Review Building Official The Building Official has reviewed the plans and has no additional comments at this time. A Building Permit will be required prior to any construction taking place. Page 12 of 15 Public Works Director/City Engineer The Public Works Director/City Engineer is currently reviewing the plans. Draft conditions at a minimum have been included on standard PW/Engineering permit requirements. Findings of Fact The Planning Commission must make a finding as to whether or not the proposed application would adversely affect the surrounding neighborhood or the community as a whole based on the aforementioned factors. Staff offers the following findings for consideration: 1. The property located at 3535 Pine Tree Drive is designated for Community Mixed Use on the 2040 Comprehensive Plan. 2. New building construction or site modification identified requires the submittal of a Site Plan Review application prior to construction. 3. For proposals for new construction, redevelopment of a site, and significant modifications to existing sites a PUD is required. 4. The PUD process allows for flexibility within the City's regulations through a negotiated process with an Applicant. 5. The Applicant has proposed a Master and Final Planned Unit Development for the development of a 41,000 square foot Headquarters Fire Station facility on the Subject Property. 6. The Subject Property is zoned B-2 General Business District which requires a Conditional Use Permit for Public Use. 7. The Cities of Arden Hills, North Oaks, and Shoreview contract with the Lake Johanna Fire Department to provide emergency response services for Fire and EMS calls to the public. The City refers to the Lake Johanna Fire Department in the 2040 Comprehensive Plan under Chapter 13, Public Facilities, Services, and Infrastructure 8. The Master and Final Planned Unit Development generally conforms to the requirements of the City Zoning Code and design standards. 9. Where the plan is not in conformance with the City Code, flexibility has been requested by the Applicant. 10. Flexibility through the PUD process has been requested in the following areas: building positioning and landscaping. 11. A public hearing for a Master Planned Unit Development, Final Planned Unit Development, and Conditional Use Permit request is required before the request can be brought before the City Council. Options and Motion Language Staff has provided the following options and motion language for this case. The Planning Commission should consider providing additional findings of fact as part of the motion to support their recommendation for approval or denial. Recommend Approval with Conditions: Motion to recommend approval of Planning Case 24- 009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, based on the findings of fact and the submitted plans, as amended by the conditions in the July 10, 2024 Report to the Planning Commission: 1. The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the Page 13 of 15 Community Development Director, shall require review and approval by the Planning Commission and City Council. 2. The Master and Final Planned Unit Development approval shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by the City Council. The City Council may extend the expiration date of such approval upon written application by the person to whom the approval was granted. 3. A violation of any condition set forth in the permit shall be a violation of this Code, and shall be cause for revocation of the permit. 4. A Master and Final PUD Development Agreement shall be prepared by the City Attorney and subject to City Council approval for the Development. The Master and Final PUD Development Agreement shall be fully executed prior to the issuance of building permits. 5. A Grading and Erosion permit shall be obtained from the City's Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including but not limited to Rice Creek Watershed District prior to the start of any site activities. 6. The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit. 7. Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and Community Development Director prior to the issuance of a grading and erosion control permit or other development permits. 8. Upon completion of grading and utility work on the site, a grading as -built and utility as - built shall be provided to the City for review. 9. Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site. 10. The Applicant shall be responsible for protecting the proposed on -site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant. 11. All light poles, including base, shall be a maximum of 30 feet in height and shall be shoebox style, downward directed, with high-pressure sodium lamps or LED and flush lenses. 12. All rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. 13. A separate sign permit shall be required for all signs on the site. 14. The Applicant shall be financially responsible for all applicable water and sanitary charges. Rates applied shall be memorialized in the Development Agreement. 15. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shall mow and maintain all site boulevards to the curb line of the public streets. 16. The proposed structures shall conform to all other regulations in the City Code. 17. The Applicant shall provide a copy of the Stormwater Management Report and verification of Rice Creek Watershed approval prior to the approval of Development Agreement. • Recommend Approval as Submitted: Motion to recommend approval of Planning Case 24- 009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, based on the findings of fact and the submitted plans in the July 10, 2024 Report to the Planning Commission. Page 14 of 15 Recommend Denial: Motion to recommend denial of Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, based on the following findings: findings to deny should specifically reference the reasons for denial and why those reasons cannot be mitigated. Table: Motion to table of Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive: a specific reason and information request should be included with a motion to table. Public Comments Notice was published in the Pioneer Press on June 28, 2024. Notice was prepared by the City and mailed to property owners within 1,000 feet of the subject property. The City has not received any public comments regarding this case. Additionally, the Applicant hosted a neighborhood meeting on May 30, 2024 and invited properties within 1,000 feet of the Subject Property to attend in order to learn more about the project. Along with representatives from the City, there were three other attendees. Feedback was generally supportive of the project. Deadline for Aj!ency Actions The City of Arden Hills received the completed application for this request on June 13, 2024. Pursuant to Minnesota State Statute, the City must act on this request by August 11, 2024 (60 days), unless the City provides the petitioner with written reasons for an additional 60-day review period. With consent of the applicant, the City may extend the review period beyond the initial 120 days. Attachments A. Land Use Application B. Location Map C. Narrative D. Site and Civil Plans E. Architectural Plans F. Lighting Plan G. Signage Plan H. Landscape Plans I. Board Letter of Support Page 15 of 15 '�Tt -ADI�EN HILLS Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, JULY 10, 2024 6:30 P.M. - ARDEN HILLS CITY HALL CALL TO ORDER/ROLL CALL Pursuant to due call and notice thereof, Chair Kurtis Weber called to order the regular Planning Commission meeting at 6:30 p.m. ROLL CALL Present were: Chair Kurtis Weber, Commissioners Brad Bjorklund, Shelley Blilie, Stephen Erler, Arlene Mitchell and Katie Stromberg. Absent: Commissioners Joshua Collins and Jonathan Wicklund. Also present were: Community Development Director Jessica Jagoe, Senior Planner Elena Fransen and Councilmember Emily Rousseau. APPROVAL OF AGENDA — JULY 10, 2024 Commissioner Bjorklund moved, seconded by Commissioner Erler, to approve the July 10, 2024, agenda as presented. The motion carried unanimously (6-0). APPROVAL OF MINUTES June S, 2024 — Planning Commission Regular Meeting Commissioner Erler moved, seconded by Commissioner Stromberg, to approve the June 5, 2024, Planning Commission Regular Meeting as presented. The motion carried unanimously (6-0). PLANNING CASES A. Planning Case 24-009; 3535 Pine Tree Drive — Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, And Site Plan Review — Public Hearing Community Development Director Jagoe stated the Applicant has submitted a land use application for Master Planned Unit Development, Final Planned Unit Development, Conditional ARDEN HILLS PLANNING COMMISSION — July 10, 2024 2 Use Permit, and Site Plan Review, proposing to develop a 3.7-acre site located at 3535 Pine Tree Drive. The Subject Property is currently owned by the Applicant. The Applicant is proposing to build a two-story fire station Headquarters facility of approximately 41,000 square feet with a training facility and training tower. The Lake Johanna Fire Department provides public fire and medical emergency response services to the Cities of Arden Hills, North Oaks, and Shoreview. The Applicant currently operates out of three stations, the proposed project would replace Station 4 located at 3615 Victoria Street in Shoreview and become the Headquarters for the Department. The Applicant is planning for construction of the new Headquarters facility to begin in 2025. Community Development Director Jagoe reported the Headquarters Fire Station facility will consist of offices for five (5) full time staff members that would maintain typical Monday through Friday 8 to 5 business hours. The fire station will have a crew of three (3) Firefighters on duty 24/7 to respond to fire and emergency medical service (EMS) calls. Community Development Director Jagoe reviewed the history of the subject property, the Plan Evaluation and provided the Findings of Fact for review: 1. The property located at 3535 Pine Tree Drive is designated for Community Mixed Use on the 2040 Comprehensive Plan. 2. New building construction or site modification identified requires the submittal of a Site Plan Review application prior to construction. 3. For proposals for new construction, redevelopment of a site, and significant modifications to existing sites a PUD is required. 4. The PUD process allows for flexibility within the City's regulations through a negotiated process with an Applicant. 5. The Applicant has proposed a Master and Final Planned Unit Development for the development of a 41,000 square foot Headquarters Fire Station facility on the Subject Property. 6. The Subject Property is zoned B-2 General Business District which requires a Conditional Use Permit for Public Use. 7. The Cities of Arden Hills, North Oaks, and Shoreview contract with the Lake Johanna Fire Department to provide emergency response services for Fire and EMS calls to the public. The City refers to the Lake Johanna Fire Department in the 2040 Comprehensive Plan under Chapter 13, Public Facilities, Services, and Infrastructure 8. The Master and Final Planned Unit Development generally conforms to the requirements of the City Zoning Code and design standards. 9. Where the plan is not in conformance with the City Code, flexibility has been requested by the Applicant. 10. Flexibility through the PUD process has been requested in the following areas: building positioning and landscaping. 11. A public hearing for a Master Planned Unit Development, Final Planned Unit Development, and Conditional Use Permit request is required before the request can be brought before the City Council. Community Development Director Jagoe reviewed the options available to the Planning Commission for Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, ARDEN HILLS PLANNING COMMISSION — July 10, 2024 3 based on the findings of fact and the submitted plans, as amended by the conditions in the July 10, 2024 Report to the Planning Commission: 1. Recommend Approval with Conditions 1) The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the Community Development Director, shall require review and approval by the Planning Commission and City Council. 2) The Master and Final Planned Unit Development approval shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by the City Council. The City Council may extend the expiration date of such approval upon written application by the person to whom the approval was granted. 3) A violation of any condition set forth in the permit shall be a violation of this Code, and shall be cause for revocation of the permit. 4) A Master and Final PUD Development Agreement shall be prepared by the City Attorney and subject to City Council approval for the Development. The Master and Final PUD Development Agreement shall be fully executed prior to the issuance of building permits. 5) A Grading and Erosion permit shall be obtained from the City's Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including but not limited to Rice Creek Watershed District prior to the start of any site activities. 6) The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit. 7) Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and Community Development Director prior to the issuance of a grading and erosion control permit or other development permits. 8) Upon completion of grading and utility work on the site, a grading as -built and utility as - built shall be provided to the City for review. 9) Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site. 10) The Applicant shall be responsible for protecting the proposed on -site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant. 11) All light poles, including base, shall be a maximum of 30 feet in height and shall be shoebox style, downward directed, with high-pressure sodium lamps or LED and flush lenses. 12) All rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. 13) A separate sign permit shall be required for all signs on the site. 14) The Applicant shall be financially responsible for all applicable water and sanitary charges. Rates applied shall be memorialized in the Development Agreement. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 4 15) All disturbed boulevards shall be restored with sod. All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shall mow and maintain all site boulevards to the curb line of the public streets. 16) The proposed structures shall conform to all other regulations in the City Code. 17) The Applicant shall provide a copy of the Stormwater Management Report and verification of Rice Creek Watershed approval prior to the approval of Development Agreement. 2. Recommend Approval as Submitted 3. Recommend Denial 4. Table Chair Weber opened the floor to Commissioner comments. Commissioner Bjorklund asked if the property would be going from 984 caliper inches of trees on the property to 48 caliper inches. Community Development Director Jagoe reported this was the case. Commissioner Bjorklund questioned if the City had a stormwater maintenance plan for this project. Community Development Director Jagoe stated the City Engineer has not received a plan to date. She explained this plan would be filed and reviewed with the City Engineer. Commissioner Erler asked why the building was placed 90 feet back instead of 50 feet. Fire Chief Tim Boehlke explained the reason for the larger setback was to allow for the trucks to be utilized for training purposes outside the front of the building. Commissioner Erler reported residents of the adjacent senior living community requested that the mature trees on the property be retained. He requested the Fire Chief speak to the proposed tree loss. Fire Chief Boehlke reported he has spoken to the residents on the adjacent property. He explained the trees that were being taken down had to be removed to accommodate the proposed building and paved area. Commissioner Erler questioned if trees would be planted somewhere else or was this not being considered by the City. Community Development Director Jagoe stated the Ordinance would require the applicant to replace trees onsite, find a suitable location offsite, or make a payment in lieu of tree plantings. She explained in this case the Fire Department does not have an offsite location identified, but the payment in lieu of fee was a landscaping fee that would be used by the City for maintenance and/or plantings. She indicated the Fire Department was asking that the payment in lieu of fee be waived as part of the PUD review. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 5 Commissioner Erler reported if the fee were charged, this would be another expense that would fall on Arden Hills taxpayers. Chair Weber asked what the fee the Applicant was requesting to be waived would be. Community Development Director Jagoe stated she did not have an estimate but reported a couple caliper inch tree may be estimated to cost $400 to $500 plus the fee would need to include the cost for installation, plus 10%. Chair Weber reported the fee that was being waived would be substantial. He explained the City Council recently voted to not maintain the trees along Old Highway 10. Councilmember Rousseau indicated the shrubs in this area would not be maintained and staff was looking into a sprinkler system for the trees in this area. Chair Weber commented on how the landscaping fee loss would be born completely by the City of Arden Hills. He was of the opinion the City needed a portion of this fee in order to properly maintain the trees in the community. Commissioner Bjorklund commented on the contour lines within the site plan stating 30% of the property was within a flood zone. He understood this would be reduced to 15% through the water retention plans. He explained the footing for the building would be five feet above the floodplain. He questioned if these plans had been studied enough to ensure the building elevation was high enough to ensure it does not flood. Fire Chief Boehlke explained he was working with the City Engineer and the watershed district on this project. He then deferred this question to the project architect. Mod Feders, architect for the project, introduced himself to the Commission. He reported Rice Creek Watershed has to approve the proposed site plans. He discussed how the City requires completed drawings by a civil engineer for watershed review. He indicated these plans were provided to the watershed district and after receiving City approval, the next step would be to receive approval of these plans with the watershed district. Commissioner Bjorklund stated he was very concerned with the loss of trees on this property. Mr. Fetters explained he worked to save as many trees as possible, but stated the proposed trees loss was necessary in order to accommodate the fire station and surrounding paved areas for the maneuverability of the vehicles. Commissioner Bjorklund commented on the stringent tree regulations that have been upheld by the City and discussed how Arden Hills worked to remain a heavily forested community. While he admired what the architect was doing, he believed that the tree loss on this site was too significant. He stated he would not vote to approve this proposal unless more trees were saved. In addition, he encouraged the architect to reconsider where the proposed trees were being planted because they were within the 100 year floodplain. Chair Weber asked if the waiving the tree mitigation fee in lieu of was a condition for approval. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 6 Community Development Director Jagoe stated the Lake Johanna Fire Department was asking for flexibility to be able to replace the 48 caliper inches of trees. She reported if there was a recommendation to waive the fee, this could be made a condition for approval. She explained at this time the applicant would be required meet City ordinance, which would require replacement to the full or flexibility for the 48 inches or other variation of an offsite location for the remainder of the caliper inches, or payment in lieu of. Chair Weber opened the public hearing at 7:28 p.m. Chair Weber invited anyone for or against the application to come forward and make comment. Community Development Director Jagoe distributed to the Planning Commission a public comment received via email that was submitted to the City in advance of the meeting. There being no in -person comment Chair, Weber closed the public hearing at 7:28 p.m. Chair Weber reviewed each of the Applicant's requests for flexibility in further detail. Chair Weber commented on the building setback and asked if anyone had any concerns regarding the proposed 90 foot setback. There was no opposition. Chair Weber requested comment regarding the landscaping plan, noting the proposed tree removal would bring the site from 984 caliper inches down to 48 caliper inches. Commissioner Bjorklund suggested the 48 caliper inches be increased to at least 200 caliper inches. Chair Weber supported the applicant being responsible for replacing two thirds of the caliper inches. He believed the City needed these trees or funding to maintain the current trees in the community. Commissioner Mitchell commented the property was 3+ acres of undeveloped land and a large portion has trees on it. She discussed how difficult it would be to construct a building on this site without losing some trees. She stated if the City were to demand keeping more trees, she anticipated the fire station would not be able to be developed on this property. She indicated this land was chosen because it was central and provided good access to the City of Arden Hills. She reported a large portion of the land would be taken up by the building along with paved area for parking. She suggested the City encourage the applicant to plant as many trees as possible, but recommended the City not require the applicant to keep half the trees, because the fire station won't fit. Chair Weber stated he understood the trees would come down, but he wanted to see trees planted elsewhere or for the payment in lieu of the trees to be made to the City, which was required of every other development in the City. Commissioner Mitchell questioned if this new fire station would be replacing another fire station. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 7 Fire Chief Boehlke reported this station would be replacing the existing station at Victoria and County Road E. Commissioner Mitchell inquired if additional trees could be planted on this site. Fire Chief Boehlke explained the City of Shoreview owned the Fire Station #4 property. He stated the fire department could opt to pay the fee in lieu of planting more trees. He indicated he was not against trees and noted the department has spent a great deal of time planning for the new fire station. He commented he would plant as many trees as possible on this property. He stated there wasn't another location for the fire station, nor would the project get any cheaper. He explained the request for flexibility was to try and minimize taxpayer cost. Commissioner Mitchell asked if this PUD could be structured in such a way that the other cities could be asked to pay for trees. Community Development Director Jagoe commented all of the project costs would be split between Shoreview, Arden Hills and North Oaks. Fire Chief Boehlke indicated Shoreview would pay 6 1 % of the project costs, North Oaks would pay 14% and Arden Hills would pay 25%. He explained the fire department secured $6.3 million from the State of Minnesota and additional federal dollars were being pursued to assist with the expense of the project. Chair Weber stated his concern was with the fact Shoreview and North Oaks would not be taking a loss on the trees, but rather this loss would be felt by the City of Arden Hills. He stated he would like to see the tree replacement required to be somewhere around 66%. Commissioner Bjorklund reported this would require the applicant to plant 300 caliper inches of trees. Commissioner Erler explained he understood this project had to move forward, but he suggested the City apply the ordinance as written and that the City pay its fair share and that North Oaks and Shoreview be required to pay their fair share. He recommended the loss be shared between the three cities. Commissioner Stromberg believed a lot of great points had been shared. She indicated she was sympathetic to the residents at New Perspective that would lose trees in their area, but she supported the project moving forward without the City being forced to pay for more trees. Commissioner Bjorklund anticipated the applicant could install larger trees onsite and in order to meet the 300 caliper inches and the building plans could move forward as proposed. Commissioner Mitchell stated she was uncertain if it would be possible to plant 300 caliper inches on the fire station property. Commissioner Bjorklund commented he was also uncertain if this would be possible, but noted he wanted to see more trees on this property. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 8 Commissioner Erler explained he agreed with Commissioner Mitchell, stating the Commission did not have enough information to understand if 300 caliper inches of trees would even fit on this property. Chair Weber stated the Commission was making a recommendation on how many caliper inches should be included in the landscaping plan. Community Development Director Jagoe discussed how the landscape architects assist with designing and spacing the trees for the project. Commissioner Mitchell suggested the Commission recommend to the City Council the number of trees on the site be maximized. Commissioner Blilie stated she would support this recommendation. Chair Weber asked how the Commission wanted to proceed regarding the flexibility for tree mitigation. Commissioner Stromberg supported allowing the flexibility in full. Commissioner Erler reported he supported the ordinance being applied in full and did not support the flexibility. Commissioner Bjorklund stated he preferred the flexibility allow for 300 caliper inches instead of 48 caliper inches. Chair Weber supported this recommendation. Commissioner Blilie supported the flexibility as written. Commissioner Mitchell explained she could support the flexibility as well, but recommended the landscaping plans be updated. Chair Weber asked if Commissioner Mitchell could support the planting of 300 caliper inches. Commissioner Mitchell indicated she could support this so long as the plantings were done in a sound manner. Commissioner Erler and Commissioner Blilie stated they could support the 300 caliper inches as well. Chair Weber asked if the 54 parking stalls was sufficient for this project. The Commission supported the proposed parking as requested. Chair Weber questioned if the Commission supported the proposed width of the driveway. The Commission supported the proposed driveway width. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 9 Chair Weber stated he understood the applicant would amend the plans to conform with City Code for the proposed sign. Chair Weber inquired how the Commission wanted to deal with the shortfall on the transparency. The Commission supported the transparency shortfall as is within the plans. Commissioner Erler moved and Commissioner Biorklund seconded a motion to recommend approval of Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, based on the findings of fact and the submitted plans, as amended by the conditions in the July 10, 2024 Report to the Planning Commission, adding Condition 18 to read: All items identified in the June 27, 2024 PW/Engineering Division memo shall be addressed. All comments shall be adopted herein by reference.; and adding Condition 19 to read: The Applicant shall follow city code accordingly for tree mitigation of 300 caliper inches. Community Development Director Jagoe questioned how the Commission wanted to address the public use dedication fee. Chair Weber questioned if staff had a range for this payment. Community Development Director Jagoe indicated she does not have a range for this project payment, but noted this payment would be split between the three cities and would be paid at the time of building permit application. Commissioner Mitchell commented on the trails that would be lost if this project were to move forward. Chair Weber stated he did not support putting the brakes on this project over the loss of these trails. Commissioner Erler discussed how the fire station would be a public use and therefore he could support the waiver of this fee. Fire Chief Boehlke explained park dedication fees were based on a percentage of the finished value of the project. He stated it was a significant amount of money. He requested the City not require a park dedication fee because the fire station would serve a public purpose. Chair Weber questioned if the development agreement for this property delayed the payment of a park dedication fee. Community Development Director Jagoe stated the development agreement for the 2 North Pine Tree Plat references that the City will consider the public use dedication fee at the time of future development for Lots 1 and 2. Commissioner Bjorklund asked what the fire department paid for this land. Fire Chief Boehlke explained the fire department paid $1.675 million for the land. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 10 Commissioner Bjorklund indicated he could support the waiver of the park dedication fee because this project was for the public good. Chair Weber commented on how the City would be taking a significant loss on this project. He discussed how the City was struggling to find funding for its own public trails. He stated he was not comfortable with the loss the City would be taking. He expressed frustration with the fact Bethel University had not paid the park dedication fees for this land. Commissioner Blilie stated she was uncomfortable requiring the fire department pay the park dedication fees, especially given the fact Bethel should have been responsible. Commissioner Mitchell indicated she was comfortable with waiving the park dedication fees given the fact the fire station would be a public benefit. Commissioner Bjorklund anticipated because Bethel University sold the land to the Fire Department, they got out of paying the park dedication fee. He did not support claiming the park dedication fee from the fire department. Chair Weber discussed how the funding would not come from the fire department, but rather would be paid by the cities of Shoreview and North Oaks, with a small portion coming from Arden Hills. Given the history of this project, he indicated he could forego the payment of the park dedication fees. Motion amendment moved by Commissioner Mitchell, seconded by Commissioner Bjorklund, to add Condition 20 to read: The Public Use Dedication/Park Dedication fee be waived for future development of Lot 2, Block 1 of the 2 Pine Tree North plat. The amended motion carried unanimously (6-0). B. Planning Case 24-014; 3776 Connelly Avenue — Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, And Site Plan Review — Public Hearing Senior Planner Fransen stated the Applicant has submitted a land use application for a Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review to redevelop the existing approximately 11,000 square foot commercial building on the property at 3776 Connelly Avenue. The Subject Property is currently owned by Standout Properties, LLC and the building is occupied by the Northern Lights Bingo Hall and Bright Side Cafe. The Applicant is proposing to renovate the existing building and resurface the parking lot. The Applicant is proposing a phased development with the event center established in Phase I and restaurant and adult day care uses to be established in Phase II and Phase III, respectively. Senior Planner Fransen reported the Applicant is seeking review and approval for Phases I and II at this time. The Applicant presented a concept review at the City Council Work session on March 11, 2024. Councilmembers provided feedback on the existing parking lot, landscaping, on -site parking, as well as the process for serving liquor. This commercial corridor is accessible Location Map Planning Case #24-009 — Public Hearing Required Applicant: Lake Johanna Fire Department Property Location: 3535 Pine Tree Drive Request: Master and Final Planned Unit Development, Conditional Use Permit and Site Plan Review Proposed Use �,$R ARAu This development consists of construction of a 41,000 square foot Headquarters Fire Station facility that will house administrative staff as well as a response crew and includes training facilities for the Lake Johanna Fire Department (LJFD). - N HILB 2 History of Subject Property • Bethel University purchased the property at 2 Pine Tree Drive to use the existing office building for higher education. • In 2020, they subdivided the approximate 43 acre site into 3 parcels known as the 2 Pine Tree North plat. • Applicant purchased Lot 2, Block 1 of that plat in 2020. • Lot 1, Block 1 is the location of New Perspective Senior Living. • During the platting process, the Applicant was conducting their due diligence on the potential for acquiring the Subject Property. • In 2018, the Applicant had completed a needs study for a new Fire Station to be built on a site that could support the communities and their needs over "the next 50 years". • Study determined that at a minimum they needed at least 3 acres. 1—t -ARPEN HILLS Overview • Subject Property is currently owned by the LJFD. Ownership will transfer to the Lake Johanna Fire Department Headquarters JPA. • LJFD provides public fire and medical emergency response services to the Cities of Arden Hills, North Oaks, and Shoreview. • Applicant currently operates out of 3 stations: • Proposed project would replace Station 4 located at 3615 Victoria Street in Shoreview. • This will be the Headquarters for the Department. • Construction planned to begin in 2025. • Facility will consist of 5 full time staff members that would maintain typical Monday through Friday 8 to 5 business hours. • Fire station will have a crew of 3 Firefighters on duty 24/7 to respond to fire and emergency medical service (EMS) calls. • Department is overseen by a Board of Directors which consists of City representatives and 3 members from the Department. • Applicant purchased Subject Property in 2021 due to the location being ideal to improve access for emergency vehicles and improve response times to the service area.-AR�.EN HiLLs 4 Overview .h. { • Development of a 3.7 acre site • Parcel zoning - B-2, General Business District • Public Use is allowed as a Conditional Use in all residential, commercial, and industrial zoning districts. • 2040 Comprehensive Plan — Community Mixed Use (CMU) • City refers to the LJFD in the 2040 Comprehensive Plan under Chapter 13, Public Facilities, Services, and Infrastructure. Direction 2040 Comp. Plan Land Use North CMU — Community Mixed Use South CMU — Community Mixed Use East CMU — Community Mixed Use & HDR — High Density Residential West CMU — Community Mixed Use Zoning B-2 General Business District B-2 General Business District B-2 General Business District & R-4 Multiple Dwelling District B-2 General Business District -A EEN HILLS 5 Conditional Use Permit City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a Conditional Use Permit. 1. Existing and anticipated traffic and parking conditions; • Applicant provided a site plan of adjacent roads to identify fire response vehicle travel patterns will be north on Pine Tree Drive to the nearby controlled intersections. • Applicant has stated that the only exception to this northerly route will be to respond to emergencies in the Hunters Park Condos, Hunters Park neighborhood, or Catholic United building. • Traffic pre-emption will control the nearby intersections for the emergency vehicle, making it safer for the firefighters and the public. • Headquarters facility will consist of 5 full time staff members and will have a crew of 3 Firefighters on duty 2417 to respond to fire and EMS calls. • A traffic study was not prepared as part of the application and may be waived by the City Council as part of the PUD. • Applicant has stated that based on their current call volume, they anticipate that this station would respond to around 2,000 calls annually. • Consultant Engineer has stated "it is not estimated that this project will generate more than 100 peak hour trips and a traffic study is not required." AT AE�EN HILLS Conditional Use Permit City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a Conditional Use Permit. 2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, and other nuisance characteristics; • Narrative states that fire trucks leaving the station to respond to emergency calls will turn on their flashing emergency lights which will capture the traffic signal at Pine Tree and County Road E. After pulling forward out of the station, trucks will make a left turn to the north on Pine Tree Drive. As they approach County Road E, they will activate their sirens, and turn to the west or east as needed. 3. Drainage; • Proposed site plan does not negatively impact drainage on adjacent properties and the Applicant has stormwater management onsite that is intended to meet the quantity and quality standards. The Application is currently being reviewed by the Public Works Director/City Engineer and will go through the Rice Creek Watershed approval process. ' ` ARE HiLLs Conditional Use Permit City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a Conditional Use Permit. 4. Population density; • Subject Property is guided as Community Mixed Use (CMU) in the 2040 Future Land Use Plan. • Area is designated for a broad range of retail, shopping, services, and office space to meet the needs of the community and surrounding areas. The expected share of uses within this area are as follows: 10% to 50% Light Industrial, 10% to 70% Retail, 10% to 70% Office, and 10% to 50% Residential. A development intensity of up to 0.8 FAR may be allowed. • Applicant is proposing a two-story 41,000 square foot building that equals 0.25 FAR. 5. Visual and land use compatibility with uses and structures on surrounding land; • Proposed building materials will meet the B-2 preferred material requirement as identified in the Design Standards. • Architect for the project notes that a cantilevered canopy visually announces that this is the public entrance to the facility and the site features a plaza and flag display at the entry for visual structures. • Applicant has stated that historically Fire Departments are very good neighbors and that two of the other stations are adjacent to residential land uses, schools and day cares. 2 t 8 Conditional Use Permit City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a Conditional Use Permit. 6. Adjoining land values; • Proposed development is not anticipated to negatively impact adjacent property values. 7. Park dedications where applicable; • Development Agreement for the 2 Pine Tree North plat indicated that Park Dedication required for Lots land 2 will be determined by the City at the time of future development and will be memorialized in development agreements for those lots. • Applicant as part of this application is requesting the City waive the Public Use Dedications including the Park Dedication Fee. • As part of their submittal, the Board has provided a letter of support for the Applicant's request. The Applicant and Board have received State of Minnesota funding for this project and applications have been made for federal funding. Funding for this Lake Johanna Fire Department Headquarters Station will primarily be through local tax dollars. 8.Orderly development of the neighborhood and the City within the general purpose and intent of the Zoning Code and the Comprehensive Development Plan for the City. -fiRD1v HILLS 9 • LJFD Headquarters Fire Station is consistent with the purpose and intent with the policies within the City's Comprehensive Plan, the B-2 Zoning District and Guiding Plan for the B-2 District. Design Standards "the arrangement, massing, materials and colors shall work to create a high quality development that is responsive to existing buildings, site features, and site design on adjoining sites in the district" R�rdsrrnF ai .: -ess •rs <r. crz' 5e�:�: %'�•.:.::ic:_s • Applicant states facility design has facade stepping and a variation in rooflines as viewed from all elevations and will incorporate many "Green Building" sustainable design features. • This project is intended to meet their needs for "the next 50 years" and will provide for the administrative, operational, apparatus bays, and training facility. • Facility will be used for classroom and hands-on training both inside the training room and outside. Groups ranging from 10-40 firefighters in attendance a few times each week. • A 4 story training tower on the west (rear) side of the building will use non -toxic fire props, theatrical smoke machines and will also be used for ladder training and rope rescue training. • As part of their design process in 2020/21, the Applicant shared schematic "artist's views" of their project plans and renderings with each City Council for feedback. • This information was used as part of their due diligence prior to preparation of their project bid documents which have been finalized. -IDENN HILLS 10 Design Standards i ram; . . , 7707-11 Building Positioning — Flexibility Requested • Section 1325.05 Subd. 8, E - 50% of the largest building on each site shall be constructed at the front setback line. • B-2 District Front Setback — 50 feet • Proposed Front Setback—Approx. 90 feet I` -ARZEN HILLS 11 Design Standards Exterior Materials — Meets Requirements • At least 75% must be a combination of brick, masonry, tile masonry, natural stone or equivalent, transparent glass. • Proposed building complies with building materials consisting of brick, glass, or metal trim on all elevations. Required Proposed Other Required Proposed Proposed Preferred Preferred Materials Transparency Transparency Transparency Materials _Materials *first level *full elevation East -75% 95°-o 5°'n 50% 5 7 % 46% Gant) Fa ade l'oe-6" 75% 94% 6% NiA 23% 10% Fa ade South 75% 97% 3% NIA 5% 4% Facade West 75% 85% 15% NIA 15% 10% Facade Rendering offeut (front] and?Lorth Elevations Renderin F of' Te -: +rear' and Soarh ?iovat�ons tm. -• } + �S v Design Standards Transparency — Flexibility/Meets Requirements First Level • 50% of all first level building fagades that front a public street shall be comprised of transparent windows or doors in order to allow views of interior uses and activities. • If the building is a 1 story design & 1st floor elevation exceeds 12 feet, then only the 1st 12 feet shall be included in calculating the fagade area. • First Level — 57% • Full Elevation —46% Required Proposed Other Required Proposed Proposed Preferred Preferred Materials Transparency Transparency Transparency Materials _Materials *first level *full elevation East -75% 95°-o 5°'n 50% 5 7 % 46% Gant) Fa ade 107t! 75% 94% 6% NiA 23% 10% Fa ade South 75% 97% 3% NIA 5% 4% Facade West 75% 85% 15% NIA 15% 10% Facade Rendering offeut (front] and?Lorth Elevations Renderin P, of' Te -: +rear' and Soarh ?iovat�ons 7 o µ y■ soon 1 i 13 Design Standards Lighting — Meets Requirements • B-2 max height 50'— Proposed max. 30' and under • Any light or combination of lights shall not cast light that exceeds a meter reading of 1 foot candle on the travel lanes of adjoining public streets or 0.4 foot candles on adjoining residential property. .� .oe .,a .,..,_ ha He 4, �a e ,a :e � ox $, 4, IAMRnE (` )'LE.HOTOMETRICS 'It --,I�EN IfiLM 14 Design Standards Landscaping — Flexibility Requested • Applicant has requested the City waive the payment in lieu of option (i.e. cost of materials and installation plus 10%) which would be considered as part of the PUD review. • Planning Commission determined that the proposed 48 caliper inches did not adequately satisfy the intent of the City's ordinance for tree mitigation. • Commission added a recommended condition of approval that the Applicant shall follow city code accordingly for tree mitigation of 300 caliper inches. Standards 20% of lot area 1 per 40 feet 10% of (Total removed —10% 10% of the parking area minimum landscape area of existing) minimum Replacement 1:2 = 443 caliper inches Proposed Development 34% 7 Approx. 9% 48 caliper inches 10.5% !1 ARZEN�HILLS 15 Design Standards Ct_i _ Tli--- i • e` �. ■IATaM �. I .. My B �• i� al • . I. �M t . PAVING � •Ffv. Parking — Planning Commission Recommendation • Proposed site plan complies with off-street parking spaces to be located a minimum of 20 feet from the ROW of any public street and 5 feet from side and rear property lines. • Number of Parking Stalls - Uses Not Specifically Noted Including Public Uses — As Determined by the City Council after recommendation by Planning Commission" • Applicant states facility will have 5 full time staff members and 3 firefighters on duty 24/7 to respond to fire and EMS calls. Trainings are a few times a week with group sizes ranging from 10-40 firefighters. • Proposing — 54 parking spaces EN HILLS 16 Design Standards Pedestrian and Bicycle Circulation — Meets Requirements • Minimum 6 foot concrete sidewalk adjacent to or in all ROW. • Proposed 6 foot concrete sidewalk along Pine Tree Drive and internal connection linking the primary entrance. • Commercial properties are required a minimum of 2 bicycle parking stalls. • Applicant is not proposing a bike rack as part of development. Driveways — Recommended Condition a.n��ai. '•W I p ANSI • City code absent on language for public use. Commercial maximum driveway width is 32 feet. Applicant is proposing 2 driveway accesses along Pine Tree Drive. • South access is proposed to be 117 feet. • North access is proposed to be 28 feet. • Public Works Director/City Engineer comments to review northern driveway access distance as it relates to the existing driveway access from the property to the north and to review southern driveway access to ENHILLS better align with the driveway access across Pine Tree Drive, if possible. 17 Design Standards Freestanding Signs — Verification Needed Sign District 7 requirements: • Up to 25 square feet in copy area • Max 8' in height • Total area of sign cannot exceed 1.5 times permitted sign copy area Proposed monument sign along Pine Tree Drive: • Externally Illuminated • 36 square feet— copy area • 5' height • 30 square feet — total sign area Wall Signs — Meets Requirements Sign District 7 requirements: • Up to 45 square feet Proposed wall signs: • Qty:2 • Non -illuminated • Totaling 28 square feet dill -ARDEN HILLS 18 B-2 District Summary Analysis ff Ordinance lie uivements 13-; District Standards Pro seed Develo meat N ammum Flaor Area Ratio AR' r x 0-33 hriamm=Bui]A m Height - - ::e=- Headquarterz Buildirla-30 f=er. TramTram= Tuwer-42 fe=: 1wLwam ma Structure Coy == - 0 18% Nb im= L Lot 'Aim 34% llmimum Fr=Y and Setback 50 feet A m- 90 feet Nbnitz= Rear Yard Setback 2.0 filet 136 feet b{mimum Side Yard SetbacJc 10 feet (min).'. =C ftotal $5 feet(lain) and 68 feet north 153 feet total Building DesiEm - PoLition;"e it F_ ont Setback = 50 feet Building = X '_�.iirdwirm Parking Requirements Public tree - Recommendafixmfmm PC 54 Parking Stall? Off -Street Pmzug Setbacks 20 fget ftnm ROW-.-" feet from side & rear lot lines %West (rear) - 46 feet South (side) -Cry fee- l+arth side - 2.0 feet Buil Q Facade Trani aene 50% arenev at front Seeks FJecubildv B ilrlingNLA=h ?5%bri* - Ie, sutural rtonf�, dewrauve mncrete, tramp-eut glass or anu combination thereof Meet Reqwxen a As L EJAme-11otmmEtne Plan Lieber reading of na more than One (1) foot candle on the travel lanes Meets ReqwxenD fs S-Uembag Trash Paelosare Meets Fequnaneam Lmdseaping Pans•,n liSbmbs)Planti¢rg T41.TI IS Applicant intends to comply ,, ith standard Lmd.-wt= R2PLxnment Trees Seeks FlecubAdv LmxEmping Boules�d Trees - 7 Meets wxmio is Pedmdriau and Bicycle CSrculation 6 fbot sidewalk & Bike Rack MeetsRequumna& Freeatandine Sipi-C-0pyAm 25 square feet Applicant intends to comply via standard Freesta¢rdiue Sign -Tool Sign Area 37.5 square feet Applicant intends to comph•nit]f standard %vall swiage Sign District 7 (M— 45 sclnare fed) 28 square feet EN HILLS 19 Additional Reviews Building Official The Building Official has reviewed the plans and has no additional comments at this time. A Building Permit will be required prior to any construction taking place. Public Works Director/City Engineer The Public Works Director/City Engineer has reviewed the plans and has provided the Applicant with a comment letter. Recommendation all comments shall be adopted herein by reference as a condition of approval. ,!it AI�EN HILLS Public Notice • Notice was published in the Pioneer Press on July 12, 2024. Notice was prepared by the City and mailed to property owners within 1,000 feet of the subject property. • One comment was received at the Planning Commission public hearing. The comment was concerning the quantity of tree removal and possible preservation of more trees. • Applicant hosted a neighborhood meeting on May 30, 2024 and invited properties within 1,000 feet of the Subject Property to attend in order to learn more about the project. Along with representatives from the City, there were three other attendees. Feedback was generally supportive of the project. AIkEN�HILLS 21 Questions? Planning Case 24-009 — Lake Johanna Fire Department 'It -AI�EN HILLS 22 PUBLIC HEARING -10B lt �-REN�HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Jessica Jagoe, Community Development Director SUBJECT: Planning Case #24-014 — Public Hearing Required Applicant: Rose Kukwa Property Location: 3776 Connelly Avenue Request: Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit and Site Plan Review Council Should Consider the Following: Hold the required public hearing for Planning Case 24-014, an application from Rose Kukwa ("The Applicant") for a Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review to redevelop the existing approximately 11,000 square foot commercial building as an event center and restaurant on the property at 3776 Connelly Avenue ("Subject Property"). The proposal includes a request to allow the use of an Event Center in the B-2 General Business Zoning District, to serve alcohol and food through a State licensed caterer of liquor and food, and for renovations to the exterior of the building. The City Council will be asked to make a formal decision regarding the application under Agenda Item 11B. Background 1.Overview of Request The Applicant has submitted a land use application for a Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review to redevelop the existing approximately 11,000 square foot commercial building on the property at 3776 Connelly Avenue. The Subject Property is currently owned by Standout Properties, LLC and the building is occupied by the Northern Lights Bingo Hall and Bright Side Cafe. The Applicant is proposing to renovate the existing building and resurface the parking lot. The Applicant is proposing a phased development with the event center established in Phase I and restaurant and adult day care uses to be established in Phase II and Phase III, respectively. The Applicant is seeking review and approval for Phases I and II at this time. Page 1 of 23 The Applicant presented a concept review at the City Council Work session on March 11, 2024. Councilmembers provided feedback on the existing parking lot, landscaping, on -site parking, as well as the process for serving liquor. This commercial corridor is accessible by way of County Road E West. This area is used by a number of small and large businesses for a variety of retail, manufacturing, distribution, warehousing, and office uses. 2. History of the Subject Property The Subject Property was constructed in 1956 and originally utilized as a lumber yard. It was later redeveloped in 1986 as a bingo hall consisting of the approximately 11,000 square foot principal structure. A site plan review was required for this development as the property had previously been used as a lumber site. The property changed ownership in 1991 and 2020 with its continued use as a bingo hall which falls under the Commercial Recreation, Indoor land use definition in the City's Zoning Code. In 2020, the property's kitchen was remodeled and the Brightside Cafe was opened within the existing bingo hall. In 2021, the Brightside Caf6 was approved for a liquor license effective in 2022. In 2023, Northern Lights Bingo Hall ceased bingo game operations and the Subject Property started to be used for organized sports, which also falls under the definition of a Commercial Recreation, Indoor land use with the installation of turf for the rental use of soccer clubs for practices. A liquor license for the Brightside Caf6 was maintained through the end of 2023 but was not renewed for 2024. Approvals 1. Zoning Code Amendment The Applicant is proposing to use the property as an Event Center. Currently, the city code is absent of land use language permitting an Event Center use or establishing standards for the development or operation of an event center within any zoning district. To allow this land use, the City's Zoning Code would need to be amended to add a definition for an Event Center and to designate this type of land use within a zoning district. The proposed Event Center would not be permitted without a zoning code amendment. As part of the land use application, the Applicant has proposed for the use of an event center to be allowed in the B-2 General Business Zoning District through a conditional use permit. The Applicant has stated that the addition of an event center as a conditional use in the B-2 Zoning District aligns with the districts purpose of accommodating commercial activities that serve the local community. The other approvals noted in the land use application would not be applicable unless the Event Center use is permitted within the B-2 General Business Zoning District. 2. Planned Unit Development A Planned Unit Development (PUD) is required for all new development and redevelopment in the B-2 Zoning District. In addition, a PUD would allow for performance standard flexibility. This proposal involves both the initial Master Plan PUD and the Final PUD for Phase I and II. Under the PUD Master Plan, the Applicant shall provide details for each stage of development, but would be required to seek the PUD Final Plan approval of Phase III at the time of establishing the future Page 2 of 23 use of an adult day care. The Applicant has provided details in the Architectural Plans (Attachment G) which identifies how the Subject Property would be utilized in Phase I as an event center, Phase II as a restaurant, and Phase III as an adult day care. The City Council should consider the different phases of development while considering the Master and Final PUD as proposed in this application. In this application, the Applicant is seeking approval for Phase I, the event center, and Phase II, which includes the restaurant. The Applicant states in the narrative that Phase II would begin immediately after the completion of Phase I for the event center with the restaurant being operational once a liquor license is obtained. Site Plan ---- --- ---- ------- -j melnn eu�rxa - - 3 C�D -..--- f i ar - i '3 + �frfr - - 4 4 9 OF/ u • � d J Cot 9 L 4 2 i Page 3 of 23 3. Conditional Use Permit The Applicant is proposing that in the B-2 Zoning District, a Conditional Use Permit is required for an event center. Typical factors to consider in the evaluation of the CUP request may be hours of operation, potential noise from the proposed use, lights from vehicles, and on -site traffic. The Applicant is proposing all events will be held inside the building to contain noise within the venue and their request includes supplementary materials related to a security plan and traffic considerations. City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a Conditional Use Permit. The City Council should consider the effect of the proposed use upon the health, safety, convenience and general welfare of the owners and occupants of the surrounding land and the community, in general, including but not limited to the following factors: 1. Existing and anticipated traffic and parking conditions; 2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, and other nuisance characteristics; 3. Drainage; 4. Population density; 5. Visual and land use compatibility with uses and structures on surrounding land; 6. Adjoining land values; 7. Park dedications where applicable; 8. Orderly development of the neighborhood and the City within the general purpose and intent of the Zoning Code and the Comprehensive Development Plan for the City. Other Approvals As part of the land use application, the Applicant is proposing an amendment to the City Code to add an event center as a type of business licensed in Arden Hills and to allow for the on -sale liquor sales at an event center through a state licensed caterer. These amendments are proposed in Chapter 3 and 5 of the City Code which establish business licensing and the standards for alcoholic beverages in the City, respectively. Due to State Statute, an event center cannot hold a liquor license. The Applicant has stated in their narrative that in Phase I of the redevelopment, the proposed event center would provide food and alcohol services through caterers with State Licenses. As part of Phase II, the Applicant intends to open the restaurant and to obtain a city liquor license for the restaurant to enhance the dining experience and complement event catering. The Applicant notes that while the intent for Phase II is to operate the restaurant on the property to serve both food and alcohol, with alcohol being provided after obtaining a City approved on - sale liquor license, there could be occasions that external catering is utilized to accommodate specific culinary preferences. Allowing the proposed event center to serve alcohol with a State licensed caterer of food and alcohol would provide for more flexible and inclusive services. City Code text amendments to Chapter 3 and 5 would be brought forward by staff to the City Council at a subsequent meeting following the decision on the land use review portion of this application. Zoning Code Text Amendments Page 4 of 23 The purpose of the B-2 General Business District is to: • Be a place in which people can live, work and play. • Create a compact, architecturally diverse, pedestrian- and bicycle -friendly community with a distinct identity. • Provide a connected sidewalk system and places for people to gather and socialize. To implement design standards to promote an attractive environment with lasting and sustainable value. • Group compatible retail and service business uses that tend to draw trade that is naturally interchangeable and promotes business prosperity. • Provide an adequate supply of businesses and professional service areas to meet the needs of the residents. • Minimize the effects of traffic congestion, noise, odor, glare and similar safety problems. According to the Applicant, the proposed ordinance amendment will support the growth and diversification of the local economy while meeting the evolving needs of the community. The Applicant references that event centers have become increasingly popular as venues for various social and corporate events and that allowing for these dedicated facilities would enhance the city's attractiveness as a destination for such gatherings. As proposed, the text amendment would define an Event Center and designate this type of land use as a conditional use in the B-2 General Business District. The Applicant has also proposed Off Street Parking Spaces Required for an Event Center use, specifying one (1) space for every three (3) seats as the required number of spaces. For the Planning Commission review, draft ordinance language was prepared based on the Applicant's narrative as well as a few other criteria suggested by staff (based on a survey of neighboring communities) for "Event Center" language within Sections 1305.04 Definitions, 1320.05 Land Use Chart, 1320.085 Special Requirements for the B- 2 General Business District, and 1325.06 Requirements for Parking, Loading and Circulation. Applicant's Narrative: 1) Add Event Center as a use permitted by a conditional use permit in the B-2 Zoning District in Section 1320.05 Land Use Chart. 2) Establish parking requirements for event centers at one (1) parking space per three (3) seats at design capacity in Section 1325.06 Requirements for Parking, Loading and Circulation. Additional Code Amendments to consider: 3) Add a definition for Event Center within Section 1305.04 Definitions a. Event Center: An establishment which is rented by individuals or groups to host scheduled private events including but not limited to weddings, cultural celebrations, corporate functions, and banquets. Such use may or may not include 1) kitchen facilities for the preparation or catering of food; 2) the sale of alcoholic beverages for on -premises consumption only during scheduled events and not open to the general public; and 3) outdoor gardens, patios or outdoor gathering areas. 4) Amend Section 1320.085 Special Requirements for the B-2 General Business District Page 5 of 23 a. Create a new Subdivision 6 — Event Center Additional Conditional Use Permit Criteria that establishes the requirements and criteria for a conditional use permit for Event Center as a conditional use in the B-2 Zoning District. Proposed language: A. In addition to meetingtquirements of Section 1325 and 1355.04 Subd 4, event centers shall conform to the following: 1. The occupancy of the building must never exceed the occupancy load posted based on the Fire Marshal's determination. 2. The serving of alcohol shall be subject to Minnesota State Statute and Chapter 5 - Alcoholic Beverages of the Arden Hills City Code requirements and is permitted only in conjunction with a private event that is not open to the public. 3. Licensing information from the Ramsey County Sheriff's Office may be requested by City. City could at its discretion request licensing information from the County Sheriffs Office. 4. A security plan shall be submitted and approved by the City; 5. A noise mitigation strategy shall be submitted and approved by the City_ B. In addition to meeting tquirements of Section 1325 and 1355.04 Subd 4, the City may: 1. Prohibit access from a predominantly residential street; 2. Restrict the hours of operation for loadingdocks; ocks; 3. Require greater than minimum setbacks for structures and driveways; 4. Require opaque screening to eliminate headlight glare; 5. Impose any other restriction it deems to be in the public interest. For research, staff conducted a survey of other local ordinances and found that Cities of New Brighton, Roseville, Shoreview, Little Canada and Vadnais Heights have language that allows for similar uses with a majority of communities requiring a conditional use permit in at least one commercial zoning district. Parking requirements were also reviewed and fell between one (1) space for every three (3) seats and one (1) space for every four (4) seats. Staff contacted New Brighton staff and heard that the primary concerns were proximity to residential neighborhoods and the liquor licensing of vendors. Staff has drafted special requirements for event centers language that considers these potential concerns. The City Council could suggest additional language for the requirements for an event center use related to proximity to residential neighborhoods and parking requirements. The Applicant has requested for the use of an Event Center to be allowed in the B-2 General Business Zoning District through a conditional use permit. The text amendment as drafted would add "Event Center" as a use permitted by a conditional use permit in the B-2 Zoning District and would add additional criteria to Section 1320.085 Special Requirements for the B-2 General Business District. The City Council may consider adding the Event Center use permitted by a conditional use permit to additional zoning districts. If identified as an amendment, the Special Requirements could be moved from Section 1320.085 and added to General Regulations in a new Section 1325.047 titled Event Center Additional Conditional Use Permit Criteria. The requirements would then be applicable to the zoning districts that the City Council recommends an Event Center be permitted by conditional use permit. The following are items identified by staff that the City Council may wish to discuss and consider: • Zoning Districts Page 6 of 23 • Permitted hours of operation in the ordinance. • Permitted maximum occupancy in the ordinance. • Specifying if outdoor space is permitted for an event center and if there would be additional requirements. The City Council is asked to review the drafted text amendments. A public hearing before the Planning Commission is required for an ordinance amendment to the Zoning Code and was held on July 10, 2024. At the July 10, 2024 meeting of the Planning Commission, an amendment was made to the drafted text amendments to Section 1325.06 Requirements for Parking, Loading and Circulation. The Planning Commission voted 6-0 to recommend the approval of amended language for an event center use to require one (1) parking space for every four (4) seats at designed capacity. Plan Evaluation Overview of Proposal Redevelopment The Applicant is proposing the redevelopment of the Subject Property as the Elegant Event Center. Improvements will be made to the exterior finishes of the principal structure, the parking lot, and the site's landscaping. Existing conditions for the site can be found on the site survey in Attachment E. The principal structure will remain on site with enhanced building materials and the proposed plans show the addition of a trash enclosure to the north side of the Subject Property. The parking lot improvements include the removal of the existing covered parking structure and the addition of parking islands for additional landscaping and area lighting for the parking lot. Changes to the parking lot include a removal of several existing parking spaces near the property driveway and the establishment of ADA ramps and surfaces and handicap accessible parking spaces. The Applicant states that the plan is to improve and restore both the building and the property so that it will enhance, not detract, from the surrounding area. Business Operations The Applicant is proposing that the Subject Property be used for three different uses within the same principal structure and that these uses will be established through a phased approach. The Subject Property would have an occupancy load of 567 people. The Applicant intends to cap facility capacity down further to 508 people with a 450-guest capacity for the event center, a 34 guest capacity for the restaurant, with an estimated staff team of 24 staff members for both the event center and the restaurant. The space is conceived to be shared among the uses with some overlap as noted in the evaluation below. Phase I - Event Center In Phase I, scheduled until December 2024, the building and other site improvements would be completed, and the Event Center use would be established. The proposed hours of operation for the event center are 8:00 a.m. to 11:59 p.m. Sunday through Thursday and 8:00 a.m. to 3:00 a.m. Friday and Saturday. The Applicant is requesting City Code Amendments to be allowed to serve liquor through a licensed caterer and would propose liquor service ending at 2:00 a.m. Page 7 of 23 At the July 10, 2024 Planning Commission meeting, the Commission added Condition 19 to the recommended conditions of approval that reads "The Applicant shall be required to cease hours of operation at 2 a.m. for commercial land uses approved as part of the PUD." In the updated narrative submitted July 15, the Applicant provided details for the proposed extended hours until 3:00 a.m., noting the hours would allow the venue to accommodate varying needs and schedules of groups, have a positive economic impact on the community and benefit local businesses, and align with the site's commitment to responsible alcohol consumption management. The City Council should consider if the condition for operations to cease at 2 a.m. shall remain a condition of approval and the Applicant shall adhere to the 2 a.m. cutoff. During Phase I, the Applicant is proposing that food and liquor for the event center will be served through a caterer that holds State licenses for food and liquor. The proposed occupancy for the event center is 450 guests, which would not include event staff. The Applicant proposes that the event hall will not exceed a seating capacity of 450 guests. Contracts will specify the permitted guest capacity and Elegant Event Center will not accommodate events whose capacity is greater than 450 guests. All marketing materials, contractual agreements, and operations will reflect the 450 guest capacity in the event center. Access to the event center spaces will be provided through the doors accessible from the east elevation patio. Patrons would pass through the doors directly into the main hall space. The existing kitchen is directly adjacent to the main hall space. The main hall space has access to the existing covered patio space, which will be utilized as a designated smoking area with fencing enclosing the space from the parking lot. Other spaces in the building that could be used during an event include bride and groom suites and an office for event staff. Additional entry and exit location information can be found on the Entry Access Plan, Sheet A2.0.1 in Attachment G. Interior Event Center Floor Plan JLL LIWLIO MPLEC.L W.If�RIVLLE V[war YnrIW ReuHYG L¢iuxM 11�E YE�e Be1NIL NOfIEfgllElil0Yl1E 10- (N ' emuvrww go[eF SYeLlxcuE �hAYnYo nYx Ll, V4,J 1 &9119 QWn O0 fYNfJL awe �.YVMC 1 o nl- �� � YYR -- 1 ank+� 1 1 uwermw � Q 1 oc 0 Page 8 of 23 @4 O.9 09 PG @4 0 or. L As part of the narrative, the Applicant noted proposed plans for security and noise control. For security, the building is equipped with at least 24 security cameras around and inside the building for monitoring of all areas and there are two police panic buttons inside the building to alert local law enforcement of incidents. The Applicant is proposing that during events there will be onsite security officers to control access points to prevent unauthorized entry, ensure alcohol is not taken onto the patio area, and maintain safety conditions for attendees. Alcohol management is also noted, with a plan for strict protocols for the serving of alcohol to monitor consumption, prevent overconsumption, and ensure compliance with laws and regulations. For noise control, the Applicant proposes a plan, stating all events will be held inside the building to contain noise. Additionally, the use of concrete in the building walls can effectively soundproof and prevent noise from leaving the building, which can reduce the impact of noise on the surrounding community. Security measures will also help manage noise in outdoor areas by managing and dispersing groups that congregate outside, particularly in the designated smoking area. The Applicant is seeking approval for Phase I with this application. The City Council should consider the proposed plans for the Event Center use and the supplementary plans for security and noise management when evaluating the PUD and CUP criteria. Phase II - Restaurant In Phase II, which the Applicant notes will begin immediately after Phase I, involves opening the restaurant area. The Applicant's proposed intent is to obtain a liquor license to provide liquor service on -site once the restaurant is operational. Liquor services would be available to the restaurant as well as the event center during restaurant hours. Currently, on -sale intoxicating liquor licenses are limited to hotels, restaurant, clubs, or exclusive liquor stores. The Applicant states that while the in-house restaurant is intended to serve food and alcohol to events, the event center would on occasion work with external caterers to accommodate specific culinary preferences or cuisines that the restaurant cannot provide. The Applicant reasons that working with outside caterers will support the event center's flexibility and inclusivity of services. The restaurant would use the existing cafe footprint and the proposed restaurant occupancy capacity is 34 seats and five (5) employees to meet staffing needs. The Applicant proposes that the restaurant will use reservation technology and real-time tracking to control the flow of guests and provide wait time information. Patrons of the restaurant would access the space through the main entry which would lead them directly to the restaurant space which is not being reconfigured from the existing floor plan. The restaurant would utilize the existing on -site kitchen. In the updated narrative received on July 15, the Applicant has stated that the restaurant would be open to the public during regular business hours and while the event space is in use for private events. The Applicant provided hours of operations specific to the restaurant use, stating that the restaurant's hours of operations will be 11:00 a.m. to 11:59 p.m. Monday through Thursday, 8:00 a.m. to 3:00 a.m. Friday and Saturday, and 8:00 a.m. to 11:59 p.m. Sunday. On Friday and Saturday, kitchen services would end at 11:59 p.m. and liquor service would end at 2:00 a.m. The Applicant is seeking approval for Phase II with this application. Page 9 of 23 Interior Restaurant Floor Plan JSTORAGE BAR 1 OGFlCE E]ESTING IYNLEI AOGY 103 GLp ET t s XALLWAY RE9TAl'IWR 2 R 1W I I, g q E%ISTING E%ISnNG .... MELET SYCTO1I1I ROOM LET yT{17�rllw¶ I' 1 ROOM ICREXEM ,L u PANNING CpI1TMNO CClGTgNUF MPRWIIN IB $FRINNLE E7 1LL Phase III —Adult Day Care Phase III, set for August 2025, includes the added operations of an adult day care program. The Applicant is working with the Minnesota Department of Human Services to modify an existing Home and Community -Based Services license. The adult day care program would offer activities such as educational programs, arts and crafts, supervised field trips, board games, and group fitness exercise sessions. The adult day care use would use the main hall of the building and a floor plan for the use is shown below. The Applicant has stated that the event center use would not overlap with the adult day care use due to the nature of both uses using the main hall of the building. The adult day care space is shown as accessible through the main entry and the side door with access through the covered patio. The proposed occupancy is 20 service participants and four (4) staff. The proposed hours of operations for Adult Day Programs are 8:00 a.m. to 4:00 p.m. Monday through Thursday. The Applicant notes that the restaurant will be operational during the hours of the adult day care to provide lunches to the day care members. Adult day care facility is a permitted use in the B-2 General Business Zoning District. However, the Applicant will be required to submit for a PUD Amendment as part of the phasing plan. A full evaluation of the future adult day care use will be provided once the PUD Amendment is submitted. The City Council should consider the Phase III use with this application and provide Page 10 of 23 comment about possible provisions for this use as it relates to an event center and restaurant within the same shared building. Interior Future Adult Daycare Floor Plan 0 AAL CA0111A NN41EU hECHANMXL E W FNF1iTY11LL EE EGNLPWN FWO W BYNRYLAI�AIMNG NELIYNMN. LWIPNENT'MLLNOT EEN&ALE FXONIIHE AIDHTOFYNYpI X!!tt THE WE6IEPN 8INE OF8XEILNS NYE.SEEPIAXTIXO RAN LI. V ...,..i�.a�ne. AHIB acwun AULNrEOLurICN r O 0 MIK FORXKIVJAIS ONXoae srNR LEL5%as, 0 o 0 o rs¢IXELrXXwPXhWs o .2 CFYPOfFIAG FOR AVNXEMNLT LIATM.NE Chapter 13, Zoning Regulations Review 1. District Provisions (B-2 General Business District) — Section 1320 Under the 2040 Comprehensive Plan, this site is guided as Community Mixed Use (CMU) on the land use plan and is zoned B-2. Direction 2040 Comp. Plan Land Use Zoning Existing Land Uses North RR — Railroad right-of-way/ I/O — Light Railroad/ I -Flex Railroad/ Industrial Industrial and Office Warehouse South CMU — Community Mixed Use B-2 — General Business Parking Lot/ Fast Food Restaurant East CMU — Community Mixed Use B-2 — General Business Parking Lot/Industrial Warehouse West VLDR — Very Low Density Residential R-1 — Single Family Single Family Residences Residential The Future Land Use designation is for a broad range of retail, shopping, services, and office space to meet the needs of the community and surrounding areas. This area may also include medium to high density housing with a potential density of three (3) to twenty (20) units per acre. The proposed site plan is attached as Attachment F. Restaurants are a permitted use within this district. Page 11 of 23 The table below provides the performance standards for the B-2 Zoning District and the preliminary analysis for the proposed development of the principal structure and the site: Ordinance Requirements B-2 Zoning District Proposed Development Standards Maximum Floor Area 0.8 .17 (existing) Ratio Maximum Structure 45% 17% (existing) Coverage Minimum Landscape Lot 20% 23.34% (proposed) Area Minimum Front Yard 50 feet 48.8 feet (existing) Setback Minimum Rear Yard 20 feet +/- 160 feet (existing) Setback Minimum Side Yard 10 feet (min)/20 feet 19.5 feet/ +/-140 feet Setback total(existing) Minimum Lot Area 13,000 square feet 2.19 acres/94,543 square feet(existing) Maximum Building Height 50 feet 20 feet, 11 7/8" +/- existin 2. Design Standards — Section 1325.05 and 1325.055 A. Exterior Materials — Flexibility Requested At least seventy-five (75) percent of the exterior building materials should be made of brick masonry, tile masonry, natural stone or its synthetic equivalent, decorative concrete plank, transparent glass or any combination thereof. Trim and other accent or decorative features may be metal, wood, split faced block, EIFS, or stucco. Metals shall have a matte finish and have visible corner moldings and trim when used on exterior walls. Undesirable materials include simulated brick, vinyl or aluminum siding, sheet or corrugated metal siding, plain concrete blocks or panels, brightly colored metal roofing or canopies, pre -cast tilt -up walls, and mirrored or reflective glass. Building colors shall be muted. Recommended colors include browns, grays, tans, beiges, and dark or muted green, blues, and reds. Bright or brilliant colors and sharply contrasting colors may be used for only accent purposes occupying a maximum of five percent (5%) of building fagades. The City Council should evaluate the architectural style and building character based on the quality of its design and on its relationship to its surroundings. Site characteristics to be evaluated for this purpose include, but are not limited to, building and landscaping materials, colors, textures, shapes, massing, building components, height, roof -line, and setback. A full plan set of building elevations is included as Attachment G. Staff has provided the review below on building materials as shared by the Applicant in order for the City Council to attain a better understanding of the full scope of their project design. Building Materials — Flexibility Requested The proposed building elevations consist of brick veneer, transparent glass, metal panels, and wood. The Applicant has requested for the brick veneer to be considered preferred materials as the Page 12 of 23 brick would be actual clay brick, approximately half (1/2) an inch to five eighths (5/8) of an inch thick. Each brick would be individually installed with mortar joints. The Applicant has also requested flexibility from the 75% desirable materials requirement on the south building elevation where there is an existing tall parapet wall above an existing overhang. The Applicant states that there is a concern about this parapet wall's ability to accept additional weight from desirable materials such as brick masonry, tile masonry or natural stone. The proposed south elevation shows metal panels used on the existing parapet wall and the materials for the elevation would consist of 63% desirable materials and 37% accent materials. If the flexibility in building materials is granted for brick veneer, the Applicant will have met the 75% threshold with desired materials on three elevations based on the calculated building proportion of brick and transparent glass. The Applicant states that the exterior finishes for all elevations would equal 89% desirable materials and 11% accent materials. Event Center Building Required Preferred Materials Proposed Preferred Materials Other Materials Required Transparency Proposed Transparency 'first 12' of elevation North Fagade 75% 100% 0% N/A 0% East Fagade 75% 96% 4% 50% 14% South Fagade 75% 63% 37% 50% 4% West Fagade 75% 95% 5% N/A 0% A. Rendering of East and West Elevations — Event Center Rendering ofSouth and North Elevations — Event Center Page 13 of 23 AM n WE%1FAIORR Ano -Ev WSR A,i 9 N�RRIFf1 IA F AMON-WBO9 v vs.ry Section 1325.05, Subd. 8, F. states that fifty percent (50%) of all first level building facades that front a public street shall be comprised of transparent windows or doors in order to allow views of interior uses and activities. If the building is a one story design and the first floor elevation exceeds 12 feet, then only the first 12 feet shall be included in calculating the fagade area. The south and east elevations of the existing building have some front views from Connelly Avenue. The Applicant has provided the proposed transparency for the first 12 feet of these two elevations and is seeking flexibility from the transparency standard due to the construction of the existing building and the nature of the proposed use. The east elevation of the building is constructed of concrete block with existing covered openings near the roofline. They have stated it would be difficult to add a significant number of windows into the existing concrete block walls to meet the 50% requirement. The Applicant also states that the function of an event space requires a certain level of privacy and that windows viewing the activity inside the space would not be conducive to the activity. The Applicant offers that the existing main entrance at the southeast corner of the building consists of glass windows and glass entry doors with additional windows on the south wall. The proposal includes plans to maintain the main entry to allow views of the activities in the restaurant and bar areas of the building. The proposal would still enhance the existing building's appearance while serving the functions inside. B. Building Positioning — Nonconforming Section 1325.05 Subd. 8, E of the Arden Hills City Code states "at least fifty percent (50%) of the largest building on each site shall be constructed at the front setback line." The minimum front yard setback for the B-2 Zoning District is 50 feet and the existing front setback line is at 48.8 feet, which encroaches into the minimum setback. The Applicant is not proposing changes to the existing setback and would maintain the existing setback with the proposed development. C. Lighting — Flexibility Requested The Zoning Code requires exterior lighting to be consistent in type, design, scale, and color to create unity in the districts. Exterior lighting for parking lots and buildings shall not be excessive and shall be directed at their intended purposes. Any light or combination of lights shall not cast light that exceeds a meter reading of one foot candle on the travel lanes of adjoining public streets or 0.4 foot candles on adjoining residential property. The proposed lighting plan includes poly mounted area lights for the parking lot and wall lights to be installed at the south and east elevations. The proposed lighting is consistent with the use and the surrounding area. The Applicant has submitted a photometric plan that identifies the types of light fixtures and quantities and has stated that the proposed lights for the parking lot will be set at a height of 20 feet. The Subject Property is not adjacent to a residential property. The photometric plan shows that proposed lighting at one location will exceed a meter reading of one (1) foot candle Page 14 of 23 on Connelly Avenue with a reading of 1.4 foot candles. As a condition of approval, all lighting shall be downward directed shoebox style with flush lenses. Details about the proposed lighting are found in Attachment H. D. Site Furnishings — Flexibility Requested Section 1325.05 Subd. 8, J, establishes provisions for site furnishings and seating areas for new development, redevelopment, and modifications to existing sites in the B-2 Zoning District. Per the code, benches and decorative plantings shall be provided near the primary entrance of all buildings on a site. At the July 10, 2024 Planning Commission meeting, Condition 18 was added to the recommended conditions of approval, reading "The Applicant shall provide benches near the primary entrance of the building." The Applicant has submitted updated Architectural and Civil Plans indicating a bench to be placed near the main entrance to the restaurant space. Also noted in J of Subd. 8, restaurants shall include a functional outdoor seating area with tables, chairs, planting and access to the restaurant. As a restaurant is part of the Master PUD, and the use will be established at the Subject Property in Phase II of development, the proposed development is subject to this requirement. The Applicant noted in this application that there are no plans for an outdoor seating area and that the porch area on the east side of the building is a designated smoke area and would not be used for outside seating for the restaurant or the event center. The Applicant also stated as part of the narrative that the proposed development is intended to be fully enclosed to ensure noise is contained within the venue. The City Council may comment on the proposed site furnishings as they apply to both Phase I and Phase II of development. E. Screening — For Review Under Section 1325.05, Subd. 8, K, Trash and recycling equipment, materials, and containers shall be fully enclosed and integrated into the architecture of the buildings. All mechanical equipment, whether roof -mounted or ground -mounted should be integrated into the architecture of the building. It shall be completely screened from the ground -level view of adjacent properties and public streets. Wood screening shall not be permitted. There is a trash enclosure proposed for the Subject Property and located on the north side of the site. This enclosure will feature metal trash enclosure gates and the other three elevations will be constructed of a metal panel material consistent with the building design. The Applicant has noted that all mechanical equipment is located on the ground along the west side of the building. There are no existing roof -mounted systems, and none will be added as part of the proposed development. The Applicant is proposing all ground mounted mechanical equipment will be screened from view by new on -site landscaping which is shown in the landscaping plans in Attachment F. The Applicant states that the equipment will not be visible from the right of way on the west side of Snelling Avenue. At the July 10, 2024 Planning Commission meeting, Condition 20 was added to the conditions of approval, reading "Screening for ground -mounted mechanical equipment shall meet the requirements of the Zoning Code." In updated landscaping plans, the Applicant updated the proposed screening plantings to an evergreen shrub to provide year-round screening. The updated narrative includes a statement from the landscape engineer, stating that the proposed planting will Page 15 of 23 provide the proper screening for the mechanical equipment. The City Council should comment as part of the review if the proposed screening is sufficient. F. Landscaping — Flexibility Requested Section 1320.06 — District Requirements Chart of the City Code requires a minimum landscape lot area of 20% or 18,908.6 square feet for the Subject Property in the B-2 Zoning District. The Applicant is proposing a landscape lot area of approximately 23.34% percent or 22,067 square feet. Additionally, at least 10% or 2,206.7 square feet of the total landscaped area (i.e. 22,067 square feet) shall be covered with perennials and/or shrubbery. The Applicant is proposing perennial and/or shrubbery of approximately 23.63% or 5,214.5 square feet. Planting islands shall occupy 10% or 6,478.8 square feet of the parking area (i.e. 64,788 square feet). The landscaping plans show seven (7) proposed parking islands but do not indicate the total square feet of the provided planting islands. Additionally, per City Code, planting islands shall be edged with concrete curbs. Parking lot planting islands shall be a minimum of 150 square feet in area, be of appropriate width and length, and each parking island shall include at least one tree to meet the requirements of this ordinance. The Applicant has stated a request for flexibility from the planting islands requirement for one (1) tree per parking lot planting island. Plans show that six (6) of the seven (7) parking lot planting islands will not have a tree planted and that one (1) planting island would have three (3) trees planted. This plan would allow site lighting in lieu of trees within six (6) of the proposed islands to provide adequate lighting to the site. At the July 10, 2024 Planning Commission meeting, Condition 19 was added to the conditions for approval, reading "The Applicant shall be required to install curbing around parking islands with parking lot improvements." In the narrative submitted on July 15, the Applicant notes that the redevelopment of the parking lot will incorporate curb and gutter around all new parking islands and all changes requested by the City Engineer/Public Works Director and the Rice Creek Watershed District based on their review of the project documents. The site contains approximately 145 caliper inches of significant trees. Section 1325.055 Subd. 5 allows for the removal of fewer than ten (10) percent of the caliper inches of significant trees on the property without requiring mitigation. Ten (10) percent of 145 is 14.5 caliper inches. The Applicant proposes removing 119 caliper inches of trees, meaning the Applicant is responsible for mitigation of 104.5 caliper inches removed above ten (10) percent. Per Section 1325.055 Subd 6, the number of caliper inches of trees required for replanting is determined at a rate of 1:2 or one (1) inch replaced for every two (2) inches lost. The Applicant intends to replace the 61 caliper inches required based on the total inches removed and the rate of replacement. Existing 10% of Proposed Inches in Required Proposed Existing Removal excess of 10% Replacement Replacement 145 caliper 14.5 caliper 119 caliper 104.5 caliper 52.25 caliper 61 caliper inches inches inches inches inches inches The City Code requires a minimum of one (1) tree be provided along the right-of-way of every 50 feet of public street frontage. The Subject Property survey shows the south property line with frontage on Connelly Avenue has approximately 20 feet of frontage. The proposed development would be required to plant one (1) tree along the Connelly Avenue right-of-way. Right-of-way tree plantings are not shown in the plans. Page 16 of 23 G. Snow Storage — For Review Adequate area should be designed for snow storage such that clear visibility shall be afforded from the property to any public street. The Applicant has identified in their narrative and on a Plan Sheet C-B in the Civil Plans (Attachment F) that snow storage would be located at the four corners of the property. The plan shows that if the snow accumulation exceeds capacity available for on -site storage, the Applicant intends to have snow hauled off -site with a snow removal vendor. H. Parking Setbacks — Flexibility Requested The City Code requires off-street parking areas to be located a minimum of 20 feet from the right-of-way of any public street. For side and rear setbacks, off-street parking areas are required to be located a minimum of five (5) feet from rear and side lot lines. The Applicant will be improving the parking lot with new pavement in generally the same configuration that exists today with the addition of pavement in the northwest corner of the property. The Applicant is seeking flexibility to maintain the existing off-street parking setback from the ROW along Connelly Avenue and adjacent to the south property line. The parking lot area would maintain a five (5) foot setback along the remaining three property lines. The paving plan is Plan Sheet C3 in the Civil Plans found in Attachment F. I. Number of Parking Stalls — Council Input Requested Per City Code 1325.06, there are general categories that determine the number of parking spaces that would need to be provided, but an event center as a principal use is not specifically identified. As part of the land use application for a Zoning Code Amendment, the Applicant has provided the following provisions to apply based on the proposed use as an event center: • Event Center — one (1) parking space for every three (3) seats at designed capacity. The Applicant is proposing the replacement of the existing parking lot with 145 parking stalls including 5 accessible stalls. Based on a review of Ramsey County Aerial Data from 2022, the Subject Property was last identified to have 74 striped parking spaces. The proposed parking replacement would result in a decrease of approximately 2,000 square feet in parking lot. The proposal includes the addition of parking islands for lighting and landscaping that do not exist on site. The proposed plan for Phase I would consist of an event center of approximately 11,000 square feet with a seating capacity for 450 guests. Based on the Applicant's proposal of one (1) parking space for every three (3) seats at a seating capacity of 450 people, the site would be required 150 parking spaces. At the July 10, 2024 meeting of the Planning Commission, the Planning Commission proposed amending the Applicant's proposed parking requirement for event centers to one (1) parking space for every four (4) seats at designed capacity. The amended amendment language was recommended for approval 6-0. With the proposed provision for the minimum off-street parking requirement as amended by the Planning Commission, the proposed seating capacity of 450 people would require 113 spaces. In Phase II, the proposed restaurant use is evaluated based on the provisions for a Restaurants, Bars use: • Restaurants, Bars — one (1) for every two (2) seats. The proposed plan for Phase II would consist of the restaurant portion of the building with a designed capacity of 34 people. Based on this provision, 17 parking spaces would be required. Page 17 of 23 As the event center and restaurant uses would be operational simultaneously, the parking requirements for both uses apply. The City Council should discuss the drafted ordinance language for the number of parking stalls. The Applicant is proposing 145 parking spaces for the site for Phases I and II of the development. • Event Center at seating for 450 guests 0 150 parking spaces required for every three (3) seats - does not meet minimum requirement for Phases I and II, flexibility requested 0 113 parking spaces required for every four (4) seats -meets minimum for Phases I and II • Restaurant at 34 seats o 17 parking spaces at two (2) seats I Driveways — Recommended Condition Within the parking requirements, the City has standards for the minimum and maximum driveway width for commercial properties. The minimum and maximum driveway widths are 22 feet and 32 feet on City streets, respectively. The Applicant is proposing to utilize the existing driveway access with frontage on Connelly Avenue. The submitted site survey does not include the dimensions of the existing driveway. City Code states that access drives may be placed adjacent to property lines but in no case shall a driveway be placed nearer than five (5) feet to an existing drive on an abutting property. Future improvements to the parking lot on the Subject Property at the driveway access would be held to the standards of the City Code. Upon further review, it was identified that a portion of the Subject Property's driveway access is located on the property to the south which is owned by Flaherty's. The Applicant has provided documentation which identifies the area of the public easement for roadway purposes (i.e. Connelly Avenue) that was dedicated in 1962. A portion of the easement was vacated in 1977 and delineated in a manner that allowed the Subject Property to retain public access to the roadway. The City has consulted the City Attorney to corroborate the information provided by the Applicant and determined that no additional easement would be required for access to the Subject Property. Based on the current information and the recommendation of the City Attorney, staff suggests the addition of Condition 22, stating that "The Applicant shall be required for parking lot improvements to relocate the driveway access including curbing so that it is entirely located within the non -vacated portion of Connelly Avenue in a manner compliant with city codes." Condition 22 was added to the conditions for approval after the July 10, 2024 Planning Commission meeting and therefore was not reviewed by the Planning Commission. K. Traffic Study and Site Circulation — For Review The site currently has one access point to the Subject Property along Connelly Avenue and no changes are proposed to the current configuration. Under Section 1325.05, Subd. 8, a traffic study shall be required for all new developments, redevelopments, and significant modifications to existing sites. A traffic study has been prepared (see Attachment I for summary section of report). The traffic report compares the Phase I event center proposal to the existing bingo hall use during weekday AM and PM peak hours. The memo dated June 10, 2024 prepared by SEH notes that the redevelopment of the site to an event center is expected to generate approximately 130 entering trips in a one -hour period prior to an event and 62 exiting trips after the event. The Phase II restaurant use was not included in the provided traffic comparison or summary. Page 18 of 23 Compared to the existing use, there would be an additional 120 trips entering in one hour and fewer trips expected to exit during one hour after an event. It is anticipated that the proposed business would generate less than 400 trips in one day, likely on a weekend with an evening event at maximum capacity. The Memo concludes that the anticipated traffic generated is not expected to impact the operations or safety of Connelly Avenue or its intersections with County Road E. The peak hours of events may conflict for a short amount of time with other adjacent businesses and the signal at County Road E and Connelly Avenue to monitor timings and make minor adjustments as needed. The Applicant was asked to demonstrate how larger trucks would maneuver internally. The Applicant did provide as part of their submission illustrating vehicle movements. This plan sheet is included in the Civil Plans within Attachment F. The Fire Marshall is still reviewing this application and has yet to provide formal comments. L. Pedestrian and Bicycle Circulation — For Review Pedestrian and bicycle improvements shall be installed in accordance with the City of Arden Hills Comprehensive Plan. The Applicant has provided a pedestrian circulation plan as part of the Civil Plans which shows site navigation for pedestrians. There is not an existing public sidewalk or trail network for an internal sidewalk system to link to adjacent to the Subject Property. The Applicant is proposing a bicycle rack/bicycle parking as part of this development located near the southeast corner of the building. The submitted Civil Plans show seven (7) bicycle spaces. City Code Section 1325.05 Subd, 8, Q does require one (1) space for every 20 parking spaces. Commercial developments are required to have a minimum of two (2) bicycle parking spaces. M. Freestanding Signs — Nonconforming, Flexibility Requested The Subject Property is located in Sign District 7. Properties in Sign District 7 are allowed one (1) freestanding sign measuring up to 25 square feet in copy area and not exceeding eight (8) feet in height. Freestanding signs shall be located at least five (5) feet from any property line. Sign copy area is defined as the area in square feet of the smallest rectangle, circle, or triangle that contains the sign copy. Signs in Sign District 7 may be lit by external illumination only. The Applicant is proposing to reface an existing freestanding pole sign located on the west side of the property. The existing pole sign is nonconforming with the height, illumination, and sign copy area requirements for freestanding signs in Sign District 7. The proposed internally illuminated sign would be approximately 16 feet in height and have a total sign copy area of approximately 23.2 square feet. Also, the total area of a freestanding sign shall not exceed 1.5 times the permitted sign copy area of said sign which would be 34.8 square feet for this application. The proposed freestanding sign has a total area of 40.4 square feet. The sign plans are shown on Page A5.1 in Attachment G. Existing Pole Sign Proposed Freestanding Sign Page 19 of 23 V-oam, r-oars• TOTALAREA OF MISTING FRBFBTANOING FOLK SIGN: 40AOF ALLDWOBU ARLk T4TALOFT AREA: n2Or u i rynna r ARTJL 25 SF b EH--L ANUING POLE SIGN ELEVATION 1!4' . 1'-0" N. Wall Signs — Meets Requirements Properties in Sign District 7 are allowed wall signs up to 45 square feet and signs may be externally and internally illuminated. The Applicant is proposing two (2) internally illuminated wall signs for a total square footage of 44.7 square feet, both to be located on the east elevation. One reading Elegant Event Center & Cafe will be installed above the main entry to the building and one reading Event Center Entrance above the entrance to the main hall from the covered patio. The signage will be offset by decorative architectural accents using an accent metal on the east and south elevations. 0� 0 n EAST BUILDING ELEVATION East Elevation with Signage and Accents South Elevation Accent Page 20 of 23 A -- 3. Procedural Requirements for Specific Applications —Section 1355.04 A public hearing for a CUP and PUD request is required before the request can be brought before the City Council. The applicant or its representative shall be given the opportunity to appear before the Planning Commission to answer questions or give explanations regarding the proposal. Upon completion of the public hearing and its study and consideration of the application, the Planning Commission shall submit its written report, containing its findings, conclusions, and recommendations as to the application, to the City Council. Plan Evaluation Summary The table below provides the performance standards for the B-2 Zoning District and the preliminary analysis for the proposed development: r mance Requiremet s Maximum Floor Area Ratio 0.8 0.17 Maximum Building Height 50 feet 20 feet, 11 7/8" +/- Maximum Structure Coverage 45% 17% Minimum Landscape Lot Area 20% 23.34% Minimum Front Yard Setback 50 feet 48.8 feet Minimum Rear Yard Setback 20 feet +/- 160 feet Minimum Side Yard Setback 10 feet min /20 feet total 19.5 feet/ +/-140 feet Building Positioning 50 feet 48.8 feet Minimum Parking Requirements Restaurant: 1 space per 2 seats 145 spaces Event Center: 1 space per 4 seats based upon PC Recommendation Total Required- 130 spa es Off-Street Parking Setbacks 20 feet from ROW Seeking Flexibility 5 feet from side/rear property lines Building Fagade Transparency 50% transparency at front Seeking Flexibility Building Materials 75% brick, tile, natural stone, Seeking Flexibility decorative concrete, transparent lass or any combination thereof Lighting Not to exceed one foot candle on Seeking Flexibility, 1.4 foot candles the travel lanes of adjoining public shown on photometric plan streets Screening/Fencing Trash to be enclosed, equipment to Trash enclosure proposed, be screened landscaping for screening Site Furnishings Benches and decorative plantings, Bench added at main entry, seeking restaurants with outdoor seating flexibility with outdoor seating area area Landscaping — Perennial/Shrubs Planting Island requirements for Applicant intends to comply curbing Landscaping — Tree Mitigation 51.75 caliper inches required for 61 caliper inches proposed for replacement replacement Landscaping — Boulevard and Boulevard Trees — <1 Boulevard Trees — 0 Island Trees Island Trees — 7 Island Trees — 3 Pedestrian and Bicycle Circulation Provide circulation plan and bike Bike Rack and plan rack Freestanding Signage — Total Sign 34.8 square feet Seeking Flexibility, 40.4 square feet Area Wall Si na e 45 square feet 44.7 square feet Page 21 of 23 Additional Review Building Official The Building Official has reviewed the plans and has no additional comments at this time. A Building Permit will be required prior to any construction taking place. Public Works Director/City Engineer The Public Works Director/City Engineer has reviewed the plans. The following comments have been provided: • Applicant shall apply for a City Grading and Erosion Control permit and submit the total area of reconstructed surface. • Applicant shall contact Rice Creek Watershed District to verify if a watershed permit is needed. • The City has received complaints of vehicle traffic that exits this property. The complaint is vehicles do not stop or yield while existing which causes issues with traffic on Connelly Avenue. Fire Marshal The Fire Marshal is currently reviewing the plans. No additional conditions have been included at this time. Planning Commission Review The Planning Commission reviewed this application at the July 10, 2024 meeting. Four recommended conditions of approval were added by the Planning Commission to include "The Applicant shall provide benches near the primary entrance of the building;" "The Applicant shall be required to install curbing around parking islands with parking lot improvements;" "Screening for ground -mounted mechanical equipment shall meet the requirements of the Zoning Code;" and "The Applicant shall be required to cease hours of operation at 2 AM for commercial land uses approved as part of the PUD." The Commission voted 5-1 to recommend approval with the 21 conditions of Planning Case 24-014. Since the July Planning Commission meeting, the Applicant has made updates to the submitted application, with the addition of a bench at the primary building entrance, a statement that the Applicant intends to comply with curbing around parking islands, and comments about the proposed ground mounted mechanical equipment screening. The Applicant also provided an updated narrative addressing the intended hours of operation. Public Comments Notice was published in the Pioneer Press on July 12, 2024. Notice was prepared by the City and mailed to property owners within 1,000 feet of the subject property. The City has not received any public comments regarding this case. Attachments A. Land Use Application B. Location Map Page 22 of 23 C. Narrative D. Requests for Flexibility E. Site Survey F. Civil and Landscape Plans G. Architectural Plans H. Lighting Plan I. Traffic Study J. Existing Site and Proposed Site Renderings K. Draft Amendment Section 1305.04 L. Draft Amendment Section 1320.05 M. Draft Amendment Section 1320.085 N. Draft Amendment Section 1325.06 O. PC Staff Report P. Draft PC Minutes Q. Presentation Page 23 of 23 DocuSign Envelope ID: ED8072AE-8DB3-4582-A8FO-OCCO1743A132 '!tt EN HILLS 1245 West Highway 96 Arden Hills, Minnesota 55112 Telephone (651) 792-7800 Fax (651) 634-5137 www.cityofardenhills.org Attachment A Planning Case No. 24- Submittal Date Application Completed Date Accepted by Receipt Number Council Decision Council Decision Date 2024 LAND USE APPLICATION Applicant Information Applicant:11 � c-3- . V\u'�\\ni a Address: U1l oi S $�;-y 5 -� ��r 5 Coa U� (�R�V� k"��..1 S~,�I DEC] Tele hone No,: ' 6 ' S 6 b Other: 651 .-1 Gl� ;, 43 Fax No.: 65k (j b (c b Email Address: V Viuk1A\W At� Property Information Property Owner: S_zA..%'>aaZ P,ta.7c-i- ,r r �.LL Owner Address: 'l 10 co v\ ' A-� Owner Telephone No. `0 c�, `1t-jr i 1A 0g , Other: Address of Propaq Involved: k�k �� 1 \-Xm Legal Description: Pro ertID No.: Type of Use: Zone: (g.R- J �1vA-Q2 p roperty Acreage,_ c1%.A SLtH sw f- % Type of Request ❑ Comprehensive Plan Amendment (Fee: $550 + Escrow: $2, 500) Conditional Use or Interim Use Permit/CUP or IUP Amendment (Fee: $400 + Escrow: $1,500) ❑ Preliminary Plat (Fee: $500 + Escrow: $2,500) ❑ Final Plat (Fee: $450 + Escrow: $1,000) ❑ Concept Plan Review (Fee: $300 + Escrow: $750) ❑ Rezoning or TCAAP Regulating Plan Amendment (Fee: $500 + Escrow: $1-,500) ❑ Zoning Code or TCAAP Redevelopment Code Amendment (Fee: $400 + Escrow: $1,500) City Code Amendment (Fee: $350 + Escrow: 1, 500) ❑ Lot SplitlMinor Subdivision (R-1 and R-2 Districts Only) (Fee: $350 + Escrow: $1,600) ❑ Variance or Permitted Adjustment (Fee: $350 + Escrow: $1,0001 Master Planned Unit Development or Master Special Development Plan (Fee: $600 + Escrow: $2,500) ❑ Vacation of Easement or Right -of -Way (Fee: $150 + Final Planned Unit Developpment or Final Sppecial Escrow: $1,000) Development Plan (Fee: $350 + Escrow: $3,000) ❑ Appeal of Administrative Decision (Fee: $150 + ❑ Planned Unit Development Amendment or Special Escrow: $1,000) Develo ment Plan Amendment (Fee: $400 + Escrow: ❑ Land Use Requests - Not Already Specified (Fee: $1,500F $150 + Escrow: $1,000 Site Plan Review (Fee: $450 + Escrow: $1,500) Page 1 of 3 DocuSign Envelope ID: ED8072AE-8DB3-4582-A8FO-OCC01743A132 Brief Description of Reauest (olease also include a tvoed. detailed letter exolainina the nroiect): C V5r- C—e.,Yt. T--V rov Iror,P "IMPORTANT" c" A..C,A� Certain applications are subject to review and approval by the Rice Creek Watershed District. Contact RCWD directly at 763-398-3070 for additional information. • The land use application fees do not cover building, sign, or other permit fees that may be required upon approval of a land use application. • All applications will be subject to additional fees for reimbursement of consultant costs associated with filing, reviewing, and processing of application in the form of an escrow to the City. F111no & Information Requirements The City requests that you make a pre -application meeting with the Community Development Director to discuss the application process, requirements, and deadlines. Unless waived by the Community Development Director or Planning Commission, a certified survey of the property is required for all applications. A checklist with additional application requirements can be found at www.citvofardenhills.ora/ianduseapplications. Complete/Incomplete Applications Under Minnesota Statute, Chapter 15.99, cities have 15 business days to review all plans and application materials to ensure they satisfy City requirements. During the 15 day review period, planning staff will provide written comments on the application and may request plan revisions. If the application Is determined to be complete, Minnesota State Statute then requires the City to approve or deny the application within 60 days, up to 120 days. If not complete, the City may require plan revisions and/or additional information before the application is scheduled for Planning Commission review and/or City Council action. Project will not be scheduled for any meeting until the application submittal is found to be complete by the Community Development Director. Payment of Fees and Escrows The undersigned acknowledges that she/he understands that before a land use application can be deemed complete, all required fees and escrows must be paid to the City. The applicant is responsible for all costs incurred by the City related to the processing of this application. Each separate land use request shall be charged a separate administrative fee and escrow even if submitted on the same application. Costs expended in reviewing and processing an application will be charged against the cash escrow and credited to the City. Charges to the escrow may include planning and engineering staff time, City Attorney and consulting fees, and mailing costs. If, at any time, a required cash escrow is depleted to less than 20 percent of Its original amount, the applicant shall deposit additional funds in the cash escrow account as determined by the City. The City may withhold final action on a land use application, withhold building permits, and/or rescind prior action until all fees have been paid. Unused portions of an escrow are returned to the applicant upon successful implementation of an approved plan. The escrow may be reduced or increased by the Community Development Director on a project by project basis. Notice of MeetinaAttendance In order for the Planning Commission and the City Council to consider any application, the applicant or a designated representative must be present at the scheduled meeting. If not, the matter may be tabled until the next available agenda. Page 2 of 3 DocuSign Envelope ID: ED8072AE-8DB3-4582-A8FO-OCCO1743A132 Meeting Schedule Planning Commission meetings are typically held on the first Wednesday after the first Monday of each month at 6:30 PM, though please contact City Hall to verify the meeting date and time. City Council meetings are held typically the last Monday of the same month at 7:00 PM. Meetings are held in the Council Chambers at the City of Arden Hills, 1245 West Highway 96, Arden Hills, Minnesota 55112, unless otherwise stated. The schedules below are for reference purposes only. Project will not be scheduled for any meeting until the application submittai is found to be complete by the Community Development Director. 2024 Planning Commission and City Council Schedule (*subject to change) TENTATIVE PLANNING COMMISSION MEETING DATE* (Generally held on the first Wednesday after the first Monday at 6:30 .m. TENTATIVE CITY COUNCIL MEETING DATE* (Generally held on the fourth Monday at 7:00 p.m.) DEADLINE FOR LAND USE APPLICATION SUBMISSION 0" day of the preceding month) January 3 Februa 12 December 1 2023 February 7 March 11 Januar y 2 March 6 Aril 8 February 1 April 3 Aril 22 March 1 May 8 May 27* Aril 1 June 5 June 24 May 1 July 10 rescheduled date July 22 June 3 August 7 August 26 July 1 September 4 September 23 August 1 October 9 October 28 September 2 November 6 November 25 October 1 December 4 Janua 13 2025 November 1 Acknowledoement and Slanature I hereby apply for the above consideration and declare that the information and materials submitted with this application are complete and accurate per city code and ordinance requirements. I fully understand that I am responsible for all costs incurred by the City related to the processing of this application. EDne ocuSigd by: 77E0365CBFSF443... Property Owner Signature (Required) Applicant Signature (if different than the property owner) 5/30/2024 Date S �-41 �, 4 Date Please contact the Community Development Director at 651-792-7800 if you have any questions regarding this application. Additional copies of this application form are available on the City's website: wo w.cr otardenhills.orgOwduseannlications �:?+l� Cti-+�ra�►:r 4.7sJ�.li �!� ��i-i-�.I.-rk +J►y�.�ll �'7a�.7il7 04r,-•r:�"11Mrra Cr.JiI`+(r�r Page 3 of 3 Location Map F-1 X, 7/3/2024, 2:58:07 PM Override 1 Personal Property Tax Parcels r••-ti — Cities County Offices 4 4 4 4 4 44 1.3,600 0 0.04 0.08 0.16 mi 0 0.05 0.1 0.2 km Ramsey County Ramsey County MN Elegant Event Center City Narrative ABSTRACT The success of our business model is dependent on the initial restoration of the property at 3776 Connelly Ave as well as being able to successfully serve the needs within the community of Arden Hills. With a background rooted in community service and event planning, founders Rose and James Kukwa have a strong track record of collaboration with government bodies, ensuring the successful implementation of impactful and sustainable projects. Their new venture, the Elegant Event Center, located at 3776 Connelly Ave, Arden Hills, Minnesota, will transform a former Bingo Hall and cafe into a multi -functional venue. This center will be developed in three phases, encompassing an event space, cafe, and an adult day care program. The project promises significant economic, social, and cultural benefits, including job creation, enhanced local spending, and increased tourism. With detailed plans for parking, security, and noise control, the Elegant Event Center is poised to be an asset to Arden Hills, enhancing both community engagement and quality of life. Rose Kukwa ELEGANT E V E N T C E N T E R Elegant Event Center City Narrative Table of Contents Elegant Event Center City Narrative............................................................................................................................................1 Introduction.......................................................................................................................................................................................2 OurBackground...............................................................................................................................................................................2 Locationand Plans...........................................................................................................................................................................2 PhasedDevelopment...................................................................................................................................................................2 OperatingHours..........................................................................................................................................................................4 Benefitsto the Community...........................................................................................................................................................5 EconomicGrowth........................................................................................................................................................................5 CommunityEngagement..........................................................................................................................................................5 Supportfor Local Businesses..................................................................................................................................................5 EnhancedQuality of Life..........................................................................................................................................................5 RevenueGeneration for the City...........................................................................................................................................6 Parking, Security Measures, and Noise Control...................................................................................................................6 Parking............................................................................................................................................................................................6 SecurityPlan.................................................................................................................................................................................7 NoiseControl.................................................................................................................................................................................8 Other comments from the planning commission and recommended conditions for approval .............................8 Conclusion..........................................................................................................................................................................................9 Changes are highlighted in blue Introduction Our business is dependent on the success and vitality of the Arden Hills neighborhood. We are committed to enhancing this community by addressing unmet needs and fostering mutually beneficial partnerships with local businesses. Our approach is rooted in collaboration, ensuring that we contribute positively to the local economy while building a solid foundation for long-term growth. We have a proven history of working effectively with government bodies to establish a reputable and thriving business. Our experience in navigating the regulatory landscape allows us to implement projects that align with community standards and expectations, ensuring that our initiatives are both sustainable and impactful. We believe that our commitment to excellence and community engagement sets us apart, positioning us as a trusted partner in the continued development of Arden Hills. Our Background Rose and James Kukwa, immigrants from Cameroon now proud US citizens, arrived in the United States 13 and 22 years ago, respectively. Their journey to entrepreneurship stemmed from a profound encounter during a bitter winter in Minnesota, when a homeless individual sought refuge at their doorstep. While offering assistance is customary in Cameroon, caution prevailed, highlighting a cultural difference. Nonetheless, their compassionate response sparked a commitment to serve their newfound community. In 2013, they founded Opportunity Community Services to aid individuals with limited means, impacting over 5000 lives by providing housing assistance and fostering community connections. Additionally, their active involvement in event planning within the Cameroonian community unveiled a pressing need for a versatile event venue, catalyzing the inception of Elegant Event Center. Location and Plans Situated at 3776 Connelly Ave in Arden Hills, Minnesota, the former Bingo Hall and Brightside Caf6 premises offer an ideal setting for an elegant event center. The property spans 11,976 square feet on 2.19 acres, with an occupancy load of 567, boasting ample parking and a sprinkler system for safety. While the current owner has made some capital improvements to the current property, there is deferred maintenance. Our plan is to improve and restore both the building and the property so that it will enhance, not detract, from the surrounding area. Phased Development Phase 1: Scheduled until December 2024, focuses on establishing a versatile event center capable of hosting various gatherings. The center, designed to accommodate up to 464 people 450 guests, will feature modern amenities and ensures a secure environment with on -site security. Catering services will be provided under licensed arrangements, ensuring compliance with alcohol serving regulations. Phase 2: Will begin immediately after Phase 1 and involves opening up the Caf6 area, obtaining a liquor license to enhance the dining experience and complement event catering. The caf& will continue to operate within its current square footage, maintaining a seating capacity of 34. It will remain open for as long as the event space is in use, providing food and beverages to event attendees. Drawings and plans are included with architectural work. Phase 3: Set for August 2025, aiming to build a sustainable business model that takes advantage of the space during other days/times for an adult day care program. This initiative addresses community needs while ensuring financial stability. We are currently collaborating with the Minnesota Department of Human Services to modify our existing Home and Community -Based Services license. Once these adjustments are completed, operations will commence. 2 ELEGANT E V E N T C E N T E R The adult day care will share the same space as the event hall on designated days of the week. We anticipate the Day care program would serve a maximum of 20 people weekly. The Caf6 will play a key role in this phase by providing hot, fresh lunches to our day care members. The Adult Day Care program will offer activities such as educational programs, arts and crafts, supervised field trips, board games, and group fitness exercise sessions. Drawings and plans are included with architectural work. Based on the occupancy load calculated by Vanney and Associates, we have determined the total occupancy of the property to be 567. We are also in communication with both the fire marshal and building officials and will partner with them/follow their recommendations to ensure a safe and secure environment. Elegant Events intends to cap its capacity to 508 people broken down as follows: I) Maximum event guest capacity would be capped at 450: The following strategies would be put in place to ensure the event hall does not exceed its maximum seating capacity of 450: Contracts with the event host will be specific about guest capacity. EEC would not accommodate any events whose capacity would require more than 450 people. All marketing materials, contractual agreements and operations will reflect this capacity of 450. Emergency Exits and Safety: EEC will Ensure all exits are clearly marked and accessible, and that all safety protocols are communicated to guests and staff. The building has an automatic fire sprinkler system throughout. Exiting Doors provided (6) 36" Existing Exit Doors. Training: Regular training of staff that will include operational capacity, reservation system, fire plans, etc. Signage: Appropriate and clear signage calling out capacity limits for both staff and guests will be visible throughout the property. Security Personnel: security staff will be onsite for events and trained on crowd control. II) Restaurant is capped at 34 patrons: The following strategies would be put in place to ensure the restaurant does not exceed its maximum seating capacity of 34: Reservation System: Implement a reservation system to control the flow of guests. Use an online booking platform that allows you to manage and limit the number of reservations. Ensure walk-in guests are only seated if there are available seats within the capacity limit. Table and seating layout: Arrangements will only be created to accommodate 34 seats. Real -Time Tracking: Use a seating management system to track the number of occupied and available seats in real time. Train staff to update the system as guests are seated and when they leave. Guest Communication: Communicate with guests through our website, reservation confirmation emails, and at the point of entry about the seating capacity and any potential wait times. III) We estimate a total staff team of 24 people for both Events and restaurant Operating Hours Operating hours are tailored to suit community needs, ranging from 8 am to 11:59 pm Monday through Thursday and Sunday. 8 am to 3 am on Fridays, and Saturdays, with liquor service ending at 2 am. See tables below of breakdown for hours of operation Event Center hours Days Monday Tuesday Wednesday Thursday Friday Saturday Sunda Hours 8am- 11:59 m Sam- 11:59 m 8am- 11:59 m 8am- 11:59 m 8am-3am 8am-3am 8am- 11:59 m Liquor/alcohol services will stop at 2am to comply with state laws on liquor/alcohol serving Restaurant Hours Days Monday Tuesday Wednesday Thursday Friday Saturday Sunda Hours llam- 11:59 m llam- 11:59 m llam- 11:59 m llam- 11:59 m 8am-3am 8am-3am 8am- 11:59 m Kitchen services will end at 11:59pm and alcohol/liquor services will end at 2am. The restaurant will be open to the public during event center activities. Adult day care center Hours Days Monday Tuesday Wednesday Thursday Hours 8am-4 m 8am-4 m 8am-4 m 8am-4 m Adult Day Care programs share the same space with events, as such, the space can only be used for either events or adult day care at any given time, not both simultaneously. Justification of extended event hours to 3am Our objective is to provide a versatile and inclusive venue that can accommodate a wide range of events and fosters community engagement. Here are the key reasons why extending our hours to 3 AM is beneficial for both our establishment and the Arden Hills community: Diverse Audience and Event Offerings: The Elegant Event Center aims to serve a broad spectrum of events, including corporate gatherings, weddings, cultural celebrations, and social functions. By extending our hours, we can accommodate the varying needs and schedules of different groups, enhancing our ability to host a diverse array of events. This inclusivity supports the cultural and social fabric of Arden Hills, making it a more vibrant and appealing place to live and visit. Economic Boost and Job Creation: Extended operating hours will have a positive economic impact on Arden Hills. Longer hours mean more employment opportunities for local residents, from event staff to security personnel and catering services. Additionally, the influx of guests attending late -night events will benefit nearby businesses, such as hotels, restaurants, and transportation services, contributing to the local economy. 4 ELEGANT E V E N T C E N T E R Enhanced Community Engagement: By offering a safe and controlled environment for late -night gatherings, the Elegant Event Center can help reduce the occurrence of unsupervised and potentially unsafe late -night activities in the community. Our facility will be equipped with professional security and strict adherence to all local regulations, ensuring a secure setting for all attendees. Balanced Approach to Alcohol Service: Our plan to end alcohol service at 2 AM, one hour before closing, demonstrates our commitment to responsible alcohol management. This policy provides a buffer period for guests to enjoy the remainder of their evening in a safe and relaxed manner, reducing the risk of overconsumption and promoting a more orderly dispersal at closing time. Community -Oriented Events: The extended hours allow us to support community -oriented events that may run late into the night, such as charity fundraisers, cultural festivals, and social gatherings that foster community spirit. These events play a crucial role in building a sense of belonging and unity among residents of Arden Hills. We believe that the Elegant Event Center, with its commitment to diversity, economic growth, and community safety, will be an asset to Arden Hills. We respectfully request your consideration of our proposal to operate until 3 AM, ensuring that our venue can fully serve the needs and aspirations of our diverse audience. Benefits to the Community Economic Growth Job Creation: The project will create employment opportunities, including event staff, kitchen staff, servers, and administrative positions. Local Spending: By sourcing supplies and services locally, the venue will support other businesses in the community. Increased Tourism: Hosting events and attracting visitors from outside the area can boost tourism and bring additional revenue to local businesses. Community Engagement • Social Hub: The venue can become a central gathering place for various community events, fostering social connections and a sense of belonging. • Cultural Exchange: Hosting a diverse range of events such as weddings, cultural celebrations, and corporate functions can promote cultural exchange and understanding within the community. Support for Local Businesses • Vendor Partnerships: Collaborating with local vendors for catering, floral arrangements, and event planning services will support small businesses and entrepreneurs in the area. • Networking Opportunities: Events hosted at the venue can facilitate networking among local businesses and professionals, leading to potential partnerships and collaborations. Enhanced Quality of Life • Access to Event Spaces: Providing a venue for weddings, parties, and community events offers residents a convenient and attractive option for celebrating special occasions. • Recreational Activities: The addition of a restaurant and potentially an adult day care program offers residents additional amenities and services that contribute to their overall quality of life. Revenue Generation for the City • Tax Revenue: The project will generate tax revenue for the city through property taxes, sales taxes, and potentially liquor license fees. • Property Value Increase: A successful and thriving event venue can contribute to the attractiveness and desirability of the neighborhood, potentially leading to an increase in property values. Parking, Security Measures, and Noise Control Parking As mentioned above, the center is designed to ,.,.,.,.m,r da4e up to 464 a4te has an occupancy load of 567. Parking needs are adequately addressed with 145 spaces available on -site. Additionally, agr-eefnen4s are being made with neighboring businesses paffiettlar-ly The Pr-esbyter-ian Chur-oh of the way leeated Minutes from the vefme to utilize their- par -king f4eilities an an as needed basis. We are presenting a proposal for establishing parking requirements for the new and future event centers in Arden Hills. As this will be the first event center in our city, there are no existing guidelines in the city code specifically addressing parking requirements for such a venue. Drawing on the standards set by neighboring cities and considering the practical needs of our facility, we propose that the parking requirement for the event center be set at one car per three seats. Comparative Research from Neighboring Cities: Roseville, MN: We reached out to the City of Roseville, and we spoke we Thomas Paschke, - the City Planner. He confirmed that Roseville requires one parking space per four seats for places of assembly, such as event centers. He also added that event centers also fall under the usage of Convention Centers whose parking requirement would be the same is place of assembly. This standard effectively balances the need for adequate parking while avoiding excessive allocation of space. Adopting a similar requirement in Arden Hills ensures consistency with regional norms and supports our venue's operational needs. Shoreview, MN: We reached out to the city of Shoreview and this city does not have specific requirement for an event center, but Izaak Peterson -city planner recommended that an event center would fall under the Commercial Recreation use. Typically, the city requires one parking space per three seats for such facilities. This alignment with the proposed ratio further supports the feasibility and practicality of implementing the same standard in Arden Hills, ensuring our city's standards are consistent with neighboring communities. Oakdale MN: We reached out to the City of Oakdale, Luke McClanahan the city planner said event centers would fall under the category of Churches, Theaters, Auditoriums, or Other Places of Assembly and the minimum parking requirements would be one car per four seats. This is similar to what Arden Hills currently has for this category with the exception of the event center which is not listed in the city code. The current requirement for this category for Arden Hills is one car per three people. Saint Paul, MN. • Saint Paul has recently eliminated minimum parking requirements for most properties, including event centers (City of St Paul Code). This policy shift aims to support economic development, reduce construction costs, and promote sustainability by encouraging alternative transportation modes. While this approach is more flexible than our proposal, it underscores the trend toward less restrictive parking requirements in urban planning. By adopting a one car per three seats ratio, Arden Hills can strike a balance between flexibility and practicality, reflecting modern planning principles. Practical and Environmental Considerations: 0 ELEGANT E V E N T C E N T E R Usage Patterns Event centers typically host a variety of events, including conferences, weddings, and performances, where attendees often carpool. This results in a higher average car occupancy compared to other facilities like restaurants or recreational centers. A parking ratio of one car per three seats accurately reflects these usage patterns, ensuring adequate parking without over -provisioning. Environmental Benefits: Adopting a parking standard of one car per three seats supports Arden Hills' commitment to sustainability. It encourages carpooling and the use of alternative transportation, which helps reduce traffic congestion and carbon emissions. Additionally, this approach aligns with urban planning trends that prioritize efficient land use and minimize unnecessary paved surfaces, contributing to a more aesthetically pleasing and environmentally friendly urban environment. Community Impact: The proposed parking ratio balances the need for sufficient parking with the desire to maintain green spaces and a visually appealing urban landscape. By avoiding the pitfalls of over -parking, such as excessive asphalt areas, we can preserve the city's charm and promote a healthier, more sustainable community. In conclusion, setting the parking requirement for event centers at one car per three seats is a practical and forward - thinking solution that aligns with established practices in neighboring cities like Roseville, Shoreview, Oakdale, and reflects modern urban planning principles seen in Saint Paul. This ratio meets the needs of the venue while supporting broader city planning goals and environmental sustainability. I respectfully request that the city council consider and approve this proposal, allowing us to proceed with the development of a facility that will bring significant cultural and economic benefits to Arden Hills. As mentioned above, Elegant Event/cafe intends to cap its capacity at 508 people. Parking needs are adequately addressed with 145 spaces available on -site. With the recommendation of approval from the City Planning Commission of 1 car per 4 seats for Event Centers, EEC would meet the minimum parking requirement for both the event center and restaurant. City code requirements for Restaurant: I carper 2 seats: The restaurant has a capacity seating of 34, going by the minimum requirement, we would need 17 parking stalls for restaurants. Cityplanning commission recommendation of 1 carper 4 seats: The cap for event guest is set at 450 guests going by the planning commission's recommendation, we would need 113 parking stalls. This will bring the minimum parking requirements for the uses proposed to 130 parking stalls. We currently have 145 parking stalls. Security Plan We have taken specific measures when it comes to security, especially with the serving of alcohol. The following measures will be implemented to ensure a safe and secure environment: 1. Surveillance System: The venue is equipped with at least 24 security cameras strategically placed around and inside the building. This comprehensive coverage will ensure continuous monitoring of all areas, including entrances, exits, and common spaces. 2. Panic Buttons: Two police panic buttons are installed inside the building. These buttons provide an immediate alert system to local law enforcement in case of emergencies, ensuring a swift response to any incidents. 3. Onsite Security Officers: During events, onsite security officers will be present to manage security operations. These officers will: o Monitor and control access points to prevent unauthorized entry. o Ensure that attendees do not take alcohol out to the patio area, which is designated as the smoking area. o Respond promptly to any security issues or disturbances, maintaining order and safety for all attendees. 4. Alcohol Management: Strict protocols will be in place for the serving of alcohol. Security officers and staff will be trained to monitor and manage alcohol consumption, preventing overconsumption and ensuring compliance with local laws and regulations. Noise Control To address concerns about noise, the following measures will be in place: 1. Indoor Events: All events will be held inside the building, ensuring that noise is contained within the venue. 2. Building Materials: The event center is constructed with concrete, which is highly effective in soundproofing and preventing noise from escaping the building. This will significantly reduce the impact of event noise on the surrounding community. 3. Security Officers: Onsite security officers will ensure that attendees do not congregate outside the building, which helps to minimize noise in outdoor areas. Security personnel will actively manage and disperse any groups that form outside, particularly in the designated smoking area on the patio, to maintain a quiet and orderly environment. Other comments from the planning commission and recommended conditions for approval Updated Narrative in response to PC #24-014 — 3776 Connelly Avenue — City Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Site Plan Review and Conditional Use Permit from July 10'h 2024 Condition 18, 19, and 20 of the Planning Commission's recommendation. The civil plans currently included within the presentation materials reflect the proposed construction as originally submitted to the planning department on June 1 2th with the exception of modifications to clarify the new evergreen shrubs proposed as screening for the existing air conditioning units in accordance with Condition 20 of the Planning Commission's recommendation and the addition of a bench to serve patrons at the main entrance of the building in accordance with Condition 18 of the Planning Commission's recommendation. It is our intention to incorporate curb and gutter around all new parking islands and all changes requested by the City Engineer and the Rice Creek Watershed District as a result of their respective review of the project documents. Statement from the landscape engineer: Yew's (Taxus) have a medium to high growth rate, a densely branched and wide spreading growth habit, are resistant to insect and diseases, come in a wide variety of forms, and can grow to a size of 5' high by 5'-8' wide. They are a choice plant for screening due to their ability to withstand shaping making them a commonly used selection for hedgerows. This specific variety of yew is also found to be resistant to winter burn in Minnesota giving this plant a greater chance to establish in the first year after planting. For these reasons we believe that this planting will provide the proper screening that the city of Arden Hills is seeking in their requirements for the mechanical equipment screening. Condition 21 of the Planning Commission's recommendation. See hours of operations above for a response. 4. The signage of the building has been updated to include a verbiage for the Restaurant. 5. Section 1325.05, Subd. 8, F. requires that fifty percent (50%) of all first -level building fagades fronting a public street be composed of transparent windows or doors to allow views of interior uses and activities. We are requesting flexibility regarding this requirement for the following reasons: a. The building is constructed from concrete block, making it very difficult to maintain structural integrity when adding windows to meet the 50% transparency requirement. 8 ELEGANT E V E N T C E N T E R b. The intended purpose of the building is to function as an event center, which necessitates a certain level of privacy. Windows allowing views into space would not be suitable for the activities planned. c. The property is quite isolated, surrounded by parking lots, bushes, and a railroad, minimizing the benefits of additional windows. Update on parking light calculations: The engineers used a height of 20' for parking lights when they calculated the foot-candles in the parking lot. Conclusion The Elegant Event Center represents a significant investment in the Arden Hills community, combining social responsibility with entrepreneurial vision. By addressing community needs through a phased development approach, this project will create a vibrant social hub and support local businesses. The strategic location, coupled with thoughtful planning around parking, security, and noise control, ensures that the center will operate smoothly and contribute positively to the neighborhood. As a symbol of resilience and inclusivity, the Elegant Event Center is set to enrich the fabric of Arden Hills, fostering economic growth, cultural exchange, and a higher quality of life for residents. The project's comprehensive benefits and alignment with modern urban planning principles make it a valuable addition to the community, deserving full support and approval. Thank you for your consideration. Aasa SJamas Kakwa Far Elegant Event Center. Vanney Associates, Inc. Architects 5-29-2024 Elegant Event Center 3776 Connelly Road Arden Hills, Minnesota Arden Hills City Planning Submittal Request for Flexibilities City of Arden Hills, We respectfully request your approval of Flexibilities to the City's Zoning code for the following items: 1. There is an existing freestanding pole sign the applicant would like to reuse. It is along the west side of the property, between the existing building and the right of way for Snelling Avenue. We propose to re -face it with a new sign for Elegant Event Center as shown on the drawings submitted in the Planning Submittal Package. 2. We propose to use thin brick as the Desirable Material. This brick would be actual clay brick approximately 1/2" to 5/8" thick. Each brick is individually installed with mortar joints. 3. All the new exterior finishes will conform to City's appearance requirements and the average overall percentage breakdown for all elevations between Desirable Materials and Accent Materials is as follows: Desirable Materials - 89% Accent Materials - 11 % The south building elevation has an existing tall parapet wall above an existing overhang. We are concerned about this parapet wall's ability to accept too much additional weight imposed by the new Desirable Materials — i.e. brick masonry, tile masonry, natural stone, etc. We would like to request a Flexibility to the percentages of Desirable Materials and Accent Materials for this elevation only. The percentages for this elevation, as shown on the in the submittal package, are: Desirable Materials - 63% Accent Material - 37% 4. The City's Design Standards state, "Fifty percent (50%) of all first level building fagades that front a public street shall be comprised of transparent windows or doors in order to allow views of interior uses and activities." We would like to request a Flexibility to this design standard. 55 East 51h Street, Suite 750 Saint Paul, Minnesota (651)222-4642 55101 Vanney Associates, Inc. Architects The existing building's main entrance is in the southeast corner of the building facing east toward the public street. It consists of glass windows and glass entry doors approximately 29'- 9" wide with additional windows on the south wall. We intend to maintain the main entry to the restaurant, bar and event space as well as the windows on the south wall. We will clean and refurbish this glass entry or replace it if needed. These windows and doors allow views of the activities in the restaurant and bar from the street. The east wall of the existing event space is constructed of with concrete block with, what appears to be, covered openings at the top of the wall near the roof line. The function of the event space requires a certain level privacy and windows viewing the activity inside would be not conducive to this activity. Also, it would be difficult to add a significant number of windows into the existing concrete block walls in order the meet the 50% requirement listed above. Our intent is to cover all the exterior walls of the event space entirely with the brick mentioned above using the pattern shown on the exterior elevation included in the Planning Submittal Package. This would enhance the existing building's appearance and better serve the function inside. 5. The project is proposing partial rehabilitation of the existing pavement through mill and overlay. Due to the limited ability to adjust existing grades with this operation, new curb and gutter is not being proposed at the parking islands. A Flexibility is requested to allow this condition in order to maintain the existing drainage patterns from the site. 6. A Flexibility is requested to allow site lighting in lieu of trees within six of the proposed landscape beds in order to provide adequate lighting to the site. 7. A flexibility is requested to allow for the installation of new 2.5-3.0 caliper inch trees in lieu of 4-6.0 caliper inch trees. In our experience, trees with diameters in the range of 2.5-3.0 caliper inches have an increased chance of surviving the transplanting process than their larger counterparts. Please let me know if you have any questions or need additional information. Thank you for your consideration. Sincerely, Rix F. VM^44 Robert F. Vanney, Architect & President Vanney Associates, Inc. 55 East 51h Street, Suite 750 Saint Paul, Minnesota (651)222-4642 55101 ---ARzEN HILLS June 4, 2024 (Response 6-12-2024) Rose Kukwa 9795 85th St S Cottage Grove, MN 55106 RE: PC #24-014 — 3776 Connelly Avenue — City Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Site Plan Review and Conditional Use Permit Dear Rose, The City has received the land use application and plans submitted for the Elegant Event Center Development at 3776 Connelly Avenue. Your application for a City Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Site Plan Review, and Conditional Use Permit was submitted on May 30, 2024. Under Minnesota Statute, Chapter 15.99, Time Deadline for Agency Action, cities have 15 business days to review zoning -related applications to ensure that all items on the application checklist have been provided. We have determined that the following required information is missing: City Narrative a. Add statement and details for proposed City Code Amendments. Narrative should address amendments for adding Event Center as a use permitted by conditional use permit in the B-2 Zoning District and for allowing an event center to serve alcohol with a caterer that holds a State liquor license. Response: Elegant Event Center is proposing amendments to the City Code to enhance our community's event hosting capabilities. Specifically, we are requesting the following changes: Addition of Event Center as a Conditional Use in the B-2 Zoning District: We propose that the City Code be amended to include "Event Center" as a use permitted by conditional use permit in the B-2 Zoning District. This amendment will allow us to operate an event center that can host a variety of functions, such as weddings, corporate events, and other social gatherings, providing a dedicated space for community engagements and celebrations. Authorization for Event Centers to Serve Alcohol with a Licensed Caterer: We also propose that event centers in the B-2 Zoning District be permitted to serve alcohol in conjunction with a caterer holding a State liquor license. This flexibility is essential for meeting the diverse needs of our clients. While we intend to operate a caf6 on the property that will serve both food and alcohol, there will be occasions where external catering is necessary to accommodate specific culinary preferences that our caf6 cannot fulfill. City of Arden Hills • 1245 West Highway 96 • Arden Hills Minnesota 55112 Phone 651.792.7800 • Fax 651.634.5137 • www.cityofardenhills.org ---ARzEN HILLS Justification for the Proposed Amendments The addition of an event center as a conditional use in the B-2 Zoning District aligns with the district's purpose of accommodating commercial activities that serve the local community. Event centers are becoming increasingly popular as venues for various social and corporate events, and having a dedicated facility will enhance the city's attractiveness as a destination for such gatherings. Furthermore, allowing event centers to serve alcohol with a licensed caterer is crucial for the flexibility and inclusivity of our services. For example, if we host a wedding where the clients desire a specific type of cuisine, such as Indian food, and our caf6 is unable to provide it, the clients should have the option to bring in a licensed vendor who can meet their needs. These proposed amendments will not only support the growth and diversification of our local economy but also meet the evolving needs of our community. By allowing event centers in the B-2 Zoning District and enabling them to serve alcohol with licensed caterers, we can provide a versatile and inclusive venue for all types of events, enhancing the overall attractiveness and functionality of our city. We respectfully request that the council consider and approve these amendments to the City Code. b. Identify if the Event Center capacity of 464 attendees includes staff and caf6 patrons or if there would be additional individuals on -site during events. Response: The fire marshal determined that the Event Hall can accommodate 464 people. This number would include Event Staff. The caf6 seats 34 people with 5 staff. The Adult Day Care has 20 occupants with 4 staff. The Adult Daycare and the Caf6 will not be open during an event in the Event Center. Therefore, our maximum occupancy will be 464 occupants at any one time. c. Specify if the caf6 will be open to non-event attendees while the event space is in use. Response: The caf6 will not be open to non-event attendees while the event space is in use. However, the kitchen will be open during events for event food and drinks. d. Specify if events such as conferences or performances would be held in the space during the Adult Day Program hours of operations. Response: Since the space is shared, it can only be used for either events or adult day care at any given time, not both simultaneously. City of Arden Hills • 1245 West Highway 96 • Arden Hills Minnesota 55112 Phone 651.792.7800 • Fax 651.634.5137 • www.cityofardenhills.org ---ARzEN HILLS e. Provide documentation of executed parking agreements with neighboring businesses, including agreement language and the number of spaces that are part of the agreement. Response: We do not believe we need additional parking. However, in the event that we need additional parking, we are in communication with Presbyterian church of the way. The pastor has assured us of 55 parking spaces, but the parking agreement has to be executed by the Church Session which does not meet until June 20th. Request for Flexibilities a. In the Elegant Event Center City Narrative, it is suggested that the formula for event center parking requirements is 1 space for every 3 seats. This narrative also states that the development is designed to accommodate up to 464 seats, which at 1 space for every 3 seats, would require 155 parking spaces. The narrative states that 145 spaces will be available on -site. The Request for Flexibilities should address this proposed flexibility. Response: According to the fire marshal, the event space has a capacity of 464 people. Based on our formula/proposal of 1 car per 3 seats, it would require 155 parking spaces. Since we have 145 parking spaces, we are requesting flexibility for 10 additional parking spaces. We believe 145 parking spaces will be sufficient because we do not anticipate a time when all 464 people would be on the property simultaneously. Most events occur on weekends or after hours when the cafe and daycare services are closed except for the kitchen, leaving us with enough parking for events. b. Address Site Furnishings and Seating Areas requirements for benches and decorative plantings and functional outdoor seating area for restaurants. Response: We do not have any plans for having an outdoor seating area, the porch area on the east side of the building is a designated smoke area and would not be used for outside seating for caf6. 3. Site Plan a. Site Plan to provide a summary tabulation of minimum B-2 District Requirements and proposed project/site data (i.e. Lot Coverage by Structure, Minimum Landscape Area, Floor Area Ratio, Impervious Surface Area, Setbacks, Parking, etc.) to aid in evaluating compliance with zoning requirements. Response: B-2 District requirements and proposed site data has been added to sheet C3. b. Identification of snow storage area(s). (Note: Separate site plan or explanation of snow storage in narrative.) Response: Snow storage locations are shown on sheet C-B. Snow in excess of what can be stored in these locations will be hauled offsite. City of Arden Hills • 1245 West Highway 96 • Arden Hills Minnesota 55112 Phone 651.792.7800 • Fax 651.634.5137 • www.cityofardenhills.org ---ARzEN HILLS c. Confirm if the proposed development will utilize the existing Utilities Plan. If not, provide Utilities Plan details. Response: Existing utilities will be utilized for the reconstruction. See sheet C3. 4. Elevation Plans/Architectural Plans a. Provide height for the building elevations. Response: The building elevation heights have been added to each elevation — see Architectural Sheets A5.0 & A5.1. b. Include details of trash enclosure on elevation drawings. Tabulation of materials to be provided. Response: This information has been added to Architectural Drawings A5.1, Details 7, 8, 9, 10 & 11. c. Include details for screening of exterior ground or roof -mounted mechanical devices, such as vents, exhaust fans, generators, and air conditioners. Response: All mechanical devices, noted above, are existing and are located on the ground along the west side of the building. There are no mechanical devices located on the roofs and no additional equipment will be added to the roofs or on the site. Response: All ground mounted mechanical equipment will be screened from view by new landscaping. Mechanical equipment will not be visible from the right of way on the western side of Snelling Ave. This is shown on the Planting Plan L1. d. Provide details for proposed delivery areas. Response: Deliveries to the building will be received through the service door on the north side of the building. This area is shown on the Architectural Drawing A2.0 & A2.1. 5. Traffic Study Response: A Traffic Study was done by SEH Engineering and submitted to the Planning Department for review. It is included in the Planning Submittal Package for distribution to the Planning Commission and City Council. 6. Circulation Plan a. Identification of internal sidewalk connections. Response: Pedestrian circulation has been added as depicted on Sheet C-C. City of Arden Hills • 1245 West Highway 96 • Arden Hills Minnesota 55112 Phone 651.792.7800 • Fax 651.634.5137 • www.cityofardenhills.org ---ARzEN HILLS b. Identification of bicycle parking. Response: Bicycle racks (7 Spaces) are proposed north of the primary entrance within the fenced area as shown on Sheet C3. 7. Truck Turning Movements Plan a. Illustration of emergency services vehicles and refuse collection circulation. (Note: turning radius information provided as an attachment) Response: Emergency service and refuse truck turning movements have been added as Sheet C-A. Signage a. The Request for Flexibilities identifies flexibility to be requested as part of a sign standard adjustment through the PUD process for deviation from Sign District 7, General Sign Regulations. The Request for Flexibilities should provide Applicant statements that address the Sign Standard Adjustment criteria (i.e. Subd. 1-3) as outlined in City Code Section 1260.01. In order to approve any sign standard adjustment, the following criteria of Subd. 1 or Subd. 2 shall be satisfied, and the necessary criteria of Subd. 3 shall be satisfied: • Subd. 1 There are site conditions which require a sign adjustment to allow the sign to be reasonably visible from a street immediately adjacent to the site; • Subd. 2 The sign adjustment will allow a sign of exceptional design or a style that will enhance the area or that is more consistent with the architecture and design of the site; • Subd. 3 The sign adjustment will not result in a sign that is inconsistent with the purpose of the zoning district in which the property is located or the current land use. b. Identify if the wall or freestanding signage will be illuminated and if so, by what mode of illumination. Response: a. The existing freestanding pole sign will be reused in its existing location. It consists of a two-sided Cabinet Sign mounted on a pole. It is internally lit with letters on translucid faces. Detail 4/A5.1 has been updated to show the height & area of the overall sign compared to the City's height & area requirements. b. There are two newly proposed illuminated wall signs shown - See Sheet A5.0 and Details #5, and 6 on A5.1 for more information. We are proposing (2) new illuminated wall signs on the new Entry Portal. One is on the east face of the Entry Portal above the portal opening. This sign Reads, "ELEGANT EVENT CENTER" and is flanked by (2) Star Symbols. The other sign is on the south face of the Entry Portal above the portal opening. This sign consists of (1) Star Symbol. These signs will be Reverse Channel construction with individual letters and stars City of Arden Hills • 1245 West Highway 96 • Arden Hills Minnesota 55112 Phone 651.792.7800 • Fax 651.634.5137 • www.cityofardenhills.org ---ARzEN HILLS symbols. The face and sides of each letter and star will be solid and opaque. They will be halo lit by using internal lighting which is emitted from the back of each letter and star symbol. Each letter and star symbol are mounted away from the wall surface behind them. This allows the lighting to hit the building material on the wall surface behind the sign creating the halo effect. 9. Landscape and Tree Preservation Plan a. Provide tabulation and/or percentage of landscape requirements for entire site including landscape lot area, perennials and/or shrubbery, caliper inches, and boulevard trees to aid in application review for compliance with B-2 Zoning District minimum requirements. Response: Percentages of total landscape area and plant coverage added to L1 sheets. b. Tabulation of size and species of all replacement trees proposed to be removed and planted on the property in accordance with the tree replacement schedule and mitigation requirements according to Section 1325.055 Tree and Landscaping Preservation. Response: Additional tables provided by the survey added to the L1 sheets along with a table of caliper mitigation measures. Your application will not be processed and the time period under Minn. Stat. § 15.99 will not begin until all of the above required information is received by the City. Items 1-9 need to be submitted to the City no later than 4 PM on Wednesday, June 12t1i, in order to be considered for review during the July meeting cycle. If you have any questions regarding the 15.99 review letter, please contact me at (651) 792-7843 or by emailat efransenkcityofardenhills. org. Sincerely, Elena Fransen Senior Planner City of Arden Hills • 1245 West Highway 96 • Arden Hills Minnesota 55112 Phone 651.792.7800 • Fax 651.634.5137 • www.cityofardenhills.org LEGAL DESCRIPTION: \ All that part of the Southwest Quarter of the Southeast Quarter of Section 27, Township 30, Range 23 lying West of \ \ \ the Easterly 832 feet thereof, and lying South of the Southerly line of the Minneapolis, St. Paul and Sault Ste. Marie \ \ \ Railroad Company's ri right of wa and lying East of the Easterly right of way line of Trunk Highway No. 51 and v g Y� Y g Y g Y g Y � \\\ lying Northerly of a line described as follows: Beginning at a point on the West line of the East 482 feet of said \ \ Southwest Quarter of the Southeast Quarter which is 344 feet North of South line of said Southwest Quarter of the Southeast Quarter; thence running Northwesterly to a point which is located as follows: Beginning at a point on said South line of Southwest Quarter of the Southeast Quarter distant 132 feet East of the Southwest corner of said Southwest Quarter of Southeast Quarter; thence running Northerly at an angle of 90 degrees 16 minutes with said South line (as measured from East to North) a distance of 455.1 feet; thence Easterly at right angles 110 feet to the point which is the terminus of the line being described. SCOPE OF WORK & LIMITATIONS: 1. Showing the length and direction of boundary lines of the legal description listed above. The scope of our services does not include determining what you own, which is a legal matter. Please check the legal description with your records or consult with competent legal counsel, if necessary, to make sure that it is correct and that any matters of record, such as easements, that you wish to be included on the survey have been shown. 2. Showing the location of observed existing improvements we deem necessary for the survey. 3. Setting survey markers or verifying existing survey markers to establish the corners of the property. 4. This survey has been completed without the benefit of a current title commitment. There may be existing kn easements or other encumbrances that would be revealed by a current title commitment. Therefore, this survey does not purport to show any easements or encumbrances other than the ones shown hereon. 5. Note that all building dimensions and building tie dimensions to the property lines, are taken from the siding and or stucco of the building. 6. Showing elevations on the site at selected locations to give some indication of the topography of the site. We �+ have also provided a benchmark for your use in determining elevations for construction on this site. The elevations shown relate only to the benchmark provided on this survey. Use that benchmark and check at least one other feature shown on the survey when determining other elevations for use on this site or before beginning construction. STANDARD SYMBOLS & CONVENTIONS: Denotes iron survey marker, set, unless otherwise noted. LEGEND DATE = CATCH BASIN GM = GAS METER = FIRE HYDRANT = POWER POLE ® = MANHOLE ® = TELEPHONE PED. B = ELEC. TRANSFORMER = WELL ® = GATE VALVE = LIGHT POLE VVV-� 0 = TREE X-X- = FENCE LINE S = SANITARY SEWER LINE W = WATER LINE G = GAS LINE ST = STORM DRAIN LINE E = OVERHEAD UTILITY LINE =BITUMINOUS SURFACE a • a: - CONCRETE SURFACE REVISION DESCRIPTION DRAWING ORIENTATION & SCALE N SCALE - 1" = 20' 0 20 40 CLIENT NAME / JOB ADDRESS ROSE KUKWA 3776 CONNELL Y A VENUE ADEN HILLS, MN \ S'dvthe _926.6 SI` 7pQ� /i/jLo of #2 < 927.4 E P/Q f' N aU/t s'tehe a < 928.4 /V o '�/awned o >>�3 /L1p/ye RAo//s I 925:4 1 I 928: to X ,2S 6 22 " Ca��4 iJ/ty /2p1 R oUS •der X I / 29, , ,% '7tJ� Raced f I #4I / X 929.9 I `1 , X 929,6 \\X 930.2 925.2 / / #5 X 929,5`, �\ fl #6 928.8 \ . 5 / � \ X 929.2 / / `7 \ `��X 929.E \� 930.1 /q X 9d9, 1 y # I 925A� � XN �'�� 928.E 0' X 928.7 1 h 1 x i I X 928.3 �� X 929.2 I D X 93Q.5 X 930,8D. h- I � i o 92 X 928.7 I r 930.3 32.1 I X X 928.7 I° X 930:5 I I X 931.1 -- a 9 �o I X 929.1 1 9�\ n 932,1 .� 926.2 o I 1 �' 1 9-0ryi8 26.5 I 1 13X 9� N 928.E -. X 930.5 X 931.1 6 { 0) X 0 twp �rnB21. I / X 928:9 i 5J X 931.4 I (� I �92�5 Nqj 9 92�J,2 / / Vr:G x f 926. / 929.6 a� X 929,9 / J� X 930.7 I X 931.3 o ' #9 929:8 X 9 5 X 92 ,6 0. ply 1 X 931.6 \� 9 .1 h _ / �(� ( 932.5 926. /� / ��?� 1 p� (� N _ D N a X 926 ' - - '0SD99 X 930.3 930.0 930.9 O X 930.6 931.2 93 8 Z, CO Co X 26.7 X 930,81 \ 1 X 931,5 X 932.2 �" 10 X 29.6 1 1 1 O O p yc 1 1 �1 Nk� O Z I X 930.3 1 1 C O 1 X +.7 1 �_ X 46.5 I I 1 1 X 930.931 U) N p� I I92 S I 930.1 1 1 r 1 X 9�30.9 931.4 N I O I I X 930.2 1 1 k ''- I I i 1 X 9 0.4 O I I I i 9*.4 XI927.8 I O 1 1 i I X 930.5 X 930.7 929.9 1 1 1 \ 931.2 I I i X 930.2 X 130.2� 1 1 I926.8 X 9� B 1 1 L I X 930.2 X 930,1 � I I 930.1 1 1 Q I X 930.4 930:7. X 930.2 1 ❑ 1 X 93011 >Q C 0 I ❑ I O 1 926:e1 X�927.4 .� 1 1 1 1 _ V1 _ _❑ --_ 1-----X930.0 � X 930:1 / I X 29:5 / 30 1 1 , 1 930.3 930:7 X 930.0 1 927.9 49. p0 4.0 1 1 ❑ 1 Zj O` er\ B/ q Hei 1� X 929:9 X 929.8 9.9 co 19.5 9h t 13.2 - _ j X 929. `Wa// X\ x OD85 �� 929.2 Q IX 928.4 929.0 2 X 929.5 \� I � \ \ X 929.5 929.6 ❑ N I\ X X 9 .6 929.6 \ 928.100' \ X 929.5 X i G \ 3 �U \ 0 \929.4 \ 928.5 Gg29 X tiI X 929,6 \ X928.6 G�� S, ` X 928.9 929: \ EO9e o/ G \ X 929,6 X 927,1 \` B%tL//7)%/JpUS 8.1 X 929 X 929 z 927.2x® X 927. "CCU' �'� \ X 927. 28.6 ��� S\ 9.4 4 9, Op_ Advance Surveying & Engineering, Co. 18202 Minnetonka Boulevard, Suite 401 Deephaven, Minnesota 55391 Phone (952) 474-7964 Web: www.advsur.com I HEREBY CERTIFY THAT THIS PLAN, SURVEY OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY REGISTERED LAND SURVEYOR UNDER THE L WS OF THE STA F MI NESOTA. Thomas oom # 42379 LICENSE NO. APRIL 24, 2024 DATE Tree# Species DEH Condition Stems Type 1 Bm, Sberian 13.0 Fair 1 Softwood 2 Boxelder 20.0 Fair 1 Softwood 3 Boxelder 12.0 Good 1 Softwood 4 Boxelder 17.0 Fair 1 Softwood 5 Boxelder 12.5 Fair 1 Softwood 6 Boxelder 13.0 Fair 1 Softwood 7 Boxelder 12.0 Good 1 Softwood 8 Boxelder 13.5 Fair 1 Softwood 9 Maple, Norway 18.0 Fair 1 Hardwood 10 Maple, Norway 14.0 Poor 1 Hardwood 1.7 SHEET TITLE EXISTING CONDITIONS DATE SURVEYED: APRI L 11, 2024 SURVEY DRAWING NUMBER C01111ehiX \ � \ 928:9 n 0 n a A � venue Benchmark: North rim MH � 927.9 DATE DRAFTED: APRIL 24, 2024 240387 TB SHEET SIZE 22 X 34 SHEET NO. S1 SHEET 1 OF 1 PRELIMINARY PLANS NOT FOR CONSTRUCTION ELEGANT EVENT CENTER PARKING LOT REMODEL ARDEN HILLS, MN OWNERIDEVELOPER ARCHITECT OPPORTUNITY COMMUNITY VANNEY ASSOCIATES, INC. SERVICES INC 55 EAST 5TH STREET, SUITE 750 1399 GENEVA AVE N, SUITE 201 SAINT PAUL, MN 55101 OAKDALE, MN 55128 E LOCATION MAP " SIT(1) I ANDERSON ENGINEERING OF MN 136051ST AVE NORTH, SUITE 100 PLYMOUTH, MN 55441 763-0124000 Attachment F Sheet List Table Sheet Number S-1 Title Ci CODER 12 DEMO PLAN C3 SITE AND PAVING PLAN C4 EROSION CONTROL PLAN L1 PLANTING PLAN 12 NOTES AND DETAILS --- EXISTING CONDITIONS SURVEY (BY OTHERS) CONSTRUCTION AREA MAP /�`., Af ANDERSON 13605 1st Avenue N. p100 Pl ...1h, MN 55441 I ae-m-- P 763.412.4000 I F 763.4-4090 ELEGANT EVENT CENTER 3776 CONNELLY AVE ARDEN HILLS MN, 55112 VANNEY ASSOCIATES, INC. PRINT NAME', IAN J. WEBER PE SIGNATURE: NOTFORCONSTRUCTION DATE: 0513012024 LICENSENO. M502 PLANNING COMMISSION MAY 30, 2024 KE— DRAWING TITLE COVER DRAWING NO. C1 PLOTTED: COMM. NO. 18065 PRELIMINARY PLANS NOT FOR CONSTRUCTION DEMOLITION NOTES Oxx�x�x�xx TREE>� TREE #8 TREE #3 D TREE NUMBERSOFEXI TING INDICATE THE LOCATION OF EXISTING TREES - -�c O TREE#10 SEE SHEET Lf FOR THE TABLE �O� TREE" _ �Xy.�yy AND NUMBERS OF SURVEYED / I^ O O ' �'—X_X _oo I 'TROD TREES TO BE REMOVED. Q TREE * X_x—ft4 X O TREE#5 _ TREE#7 °I r -- I 111111111 TIr 1 I / I 2= -___I �j' I I I IIIIIIIIII I EXISTING1 I- BUILDING \� r ©� 7 o �I =7---------- % I ?� I X I� /c lJ lJ lJ % TREE#i / I I I I � ---- L---------J L---------J L---------- I � / / 0® LEGEND / PROPERTY LIMITS / w EXISTING WATERMAIN s EXISTING SANITARY SEWER x x EXISTING FENCE 9 s EXISTING GAS MAIN EXISTING HYDRANT AND GV MILL EXISTING ASPHALT PAVEMENT (DESIGN BY OTHERS) REMOVE EXISTING PAVEMENT AS REQUIRED FOR OVERLAY AND LANDSCAPING. PROTECT EXISTING BASE TO REMAIN OUTSIDE OF LANDSCAPED AREAS. REMOVE EXISTING ASPHALT PAVEMENT AND VEGETATION AS REQUIRED FOR OVERLAY AND LANDSCAPING INSTALLATION. PROTECT EXISTING BASE TO REMAIN OUTSIDE OF LANDSCAPED AREAS. -�, REMOVE EXISTING CONCRETE SIDEWALK SAWCUT EXISTING PAVEMENT REMOVETREE KEYNOTES �2 DEMOLISH EXISTING GGYERED—INS STRIJ—RE. O SAWLUISTIN"TUMINOUS PAVEMENTSOESIGN Br OTHRISI T PAVEMENT AT MEMO_ ® REMOVE Ex STING CONCRETE SIDLEWALK. o PRO111TEXNTNGUTILITIES TOREMAN. © PROTEITEXISTING POWER POLE TOREMAIN. Q PROTECT EXISTING BUILDING TO REMAIN, Q0 PROTECT EXISTING CURB TO REMAIN. PROTECT PENCE TO REMIN 1® REMOVE EXSTNG CHAIN LINK FENCE OWNER CIVIL ENGINEER OPPORTUNITYCOMMUNITY ANDERSON ENGINEERING SERVICES INC 136051ST AVE N #100 1399 GENEVA AVE N, SUITE 201 OAKDALE, MN 55128 PLYMOUTH, MN 55441 ARCHITECT VANNEY ASSOCIATES INC. 55 EAST 5TH ST, SUITE 750 ST. PAUL, W- cc.n. WlRE MESH _MFORDEO ESL TRENCH /r ENCNEERIrvc FABRIC FABRIC ANCHORAGE o�REcrooN OF E I NATURAL soIL MPEo UNOFF FLOW / N. NATURAL SOIL) MI L S—N. NOTE DEPEND NO UPON IONFIGU-Tl-,—H FAIRII TO WOOD POSTS WIN SIPLES TYPICAL INSTALLATION li ANDERSON 13505 1st A Ne N. p Ply..—, MN 55441I a P 763.412.4000 1 F 763,412n40.r ELEGANT EVENT CENTER 3776 CONNELLY AVE ARDEN HILLS MN, 55112 VANNEY ASSOCIATES, INC. 11"INN III PRINT NAME', IAN J. WEBER PE SIGNATURE: NOTFORCONSTRUCTION DATE: 0513012024 LICEMSENO. M502 PLANNING COMMISSION MAY 30, 2024 SL DRAWING TITLE DEMO PLAN DRAWING NO. C2 PLOTTED: I COMM. NO. 18065 PRELIMINARY PLANS NOT FOR CONSTRUCTION GENERAL NOTES: �5� x 0P .'8 -mTllxE 1 —- "------- / 20 EXISTING BUILDING 81 1 \ B 5 24' 2]' I 0 180 •• 11 .O� 12 \ 4 0 \ 18' O3 O ko YP 0 SITE DATA 0 LEGEND 20' 40' A N D E R S O N PROPERTY LIMITS BUILDING SETBACKS 13605 1st A Ne N. p PARKING SETBACK Plymouth, MN 554411 ae-mn cor� EXISTING FENCE An B .4 i 4000 Ie F ]63 410140-. a M PROPOSED MILL & OVERLAY — (DESIGN BY OTHERS) DSCAPING(SEE SHEET LIB LANDSCAPING O L ® NO PARKING ZONE ELEGANT EVENT HANDICAP STALL DESIGNATION CENTER NUMBER OF PARKING STALL IN O SECTION PRO POSED FULL DEPTH ASP HALT PAVEMENT 3776 CONNELLY AVE RECONSTRUCTION PER 3/03 ARDEN HILLS MN, 55112 P DRDPTESB ICNOINNGINAR°FB: NHGLEEEI L6BDBNEBB UITMOIPTTEA'ARLUV REI KNGLGGETMoER5D6AREA 69200 VANNEY ASSOCIATES, INC. ERZ- WALKWAYEANIPATIOG " SIDE pia Tlcuvl ARrc NGLOTIIOUSAL 6eaasF PaOPDSFD 0 at9 SF NO RDTA ,L BF llTlYllFTl'pAlAT IS PARKING SETBACKE - / =T'. ,DFROM s PUBLIC Row wurcwnrs AND vnnos: z,so sFF M1NNesaTa. "EBR Da1ea TPE uw J-Y TLl % LOT COVERAGE BY smuu RE OF— INGI -/ LSGREDUIRE w%ioiu Loi coveaAcesev SmuciuRF PRINT NAME', IAN J. WEBER PE STALLS 2-WAYAISLE PAINN% LANDSCAPED AREA SIGNATURE: NOTFORCONSTRUCTION / ATOTAL CCESSIBLE sTA aRK O. t4s (wIT„ sTOTALAREATNESITE - - DATE: 0513012024 LICENSENO. 55502 °usl IN © TOTAL AREA, OF PAP— LOT —MENT - EILSU) SIP REVISION LOG TOTAL I-ANDSCAPE / ICAISLAND KEYNOTES l NOSNEDEElEll oaOOoaAiEI nEAryMIN -- QOQOaB eINasaieuARKINGsTAUOrrP) PROTECT EXISTING UTILITIES TO REMAIN, NEWCONCRETESIDFWALKAAcaAD Nc. _—_— NEW TRASHENCLGSURESEEARCHPLANS, oADAPARKNGANDACCESSABLE -- ©soswALKHEICHTTOFLUSHATTOEOFRAMP. MFULL THIcrcsrvso Eo — QINSTNU-ADA RAMP. TRUNCATED DOMES, AND LANDING PER DETAIL "CS — 1® I11I tarvoscAPlrvc BED PER 1"EEis Lt AND L2 PRDPDBED FFND NG. BEE AND„ PLANS. PLANNING COMMISSION t® INSTAL -NEW SEVEN SPACE FRAME SINGLE SIDED. BIKE RACK. MAY 30, 2024 DEUGNED. S UW PROPOSED BENCH q�cervr 131-13B• STOP SIGN AND POST.Irvsiatl slcNS FACING FVFNT R PARKING LOT I DRAWING TITLE B-2 DISTRICT REQUIREMENTS LOT COVERAGE BY 45Z STRUCTURE MINIMUM LANDSCAPE AREA 201 HEIGHT 50 FEET FLOOR AREA NATO 0.8 PARKING SETBBACK FRONT 20 FROM PUBLIC ROW REAR &SIDE: 5' FRONT: 50' BUILDING SETBACK REAR 20' DE 10' PLC h SUP LLNG UNIT 20 DENSITY PER NET ACRE REGULAR PARKING ALLS' W MINIMUM OF 5 FOR EVERY HANDICAP PARKING 101-150 REGULAR PARKING STALLS SITE AND PAVING PLAN DRAWING NO. C3 PLOTTED: GOMM. NO. ,8065 PRELIMINARY PLANS NOT FOR CONSTRUCTION STOW MTER POLLUTION PRENGNTION NOTES .........m,.,�.m.......�..-,,., GENERAL NOTES: �z s..PLAIN """`��" "" °"' "�'�` w°°�,�®w� `•••"'•'"" ,"•" rva.pµu:w , � "`"""`�'""•'"`m•, nu consRucTlox sxA�E coMv�v wlrx xzB EDlnox ov MxooT sTAxonRD coxsrau.... IPECIFICAnon wowD Axv ." ° RU TSR, As �E.uLeONsmuenON sn—eoMREv wrtNem of—E. Nlus, nxD RICE CREEI ATERSNED DI—Cl 0 20• 40' B. .—lU ro.—N.-E. APPLI.—IPA MENTS."caes0 aru si-IOEsnomN IE — LEGEND s . �.,...°°�,...k�,�,�..aa.�aM«<,o ,°a..�w.aw°.w '.••w�°.,.,.,°aw.��,.,,.,.,�°".°.�"...°���..°°.,".mw".... "eww.a"••"°°"`°.•`°"w'.,••,•�„"•°`•"`"°`•"•,"`°"• rnu sarvos Pnv nu refs PaovioE Paoor or ilusDanncE.u,o vaovmE nrvr nECEssnar mnrcic conmoE roa rNE PROPERTY LIMITS o.ec.,o,.,re,owmi"ww, rn� ram" .,®,��.EM, curlxrvLL SRcnorvs. osr meRxcwRRR OF RRCDRD. — — _ — CONSTRUCTION LIMITS °aE,..ve.....°°a.°,°,ao,.R.°,.�.",m°,..,.. °....�.«..,,�,�.. PLIN 11. DwNERrcAMRAerNA.""TE`PREeonsTR MEErIxGPRIOR TO eoN—TSIoN. -- s� -- EXISTING MINOR CONTOUR G ' aee wum,s��.°fvwm "u°x°Ecw Pnw 'a. mvnux uo�O � wxvrmasw,•_ex�rnu,osmirx,nm,wiv ixwm"ua,ee,uuresu,,,emw,o.°uurmu, r.vsu,macxn,.Euwwiwu 1z. au coxsmucronncnvr Es snnu MEEr THE RECDMMExDAT oxSDE rNECEDn:cxN_REvom. H'RE EXISTING MAJOR CONTOUR c"wm wEoµGO DRAINAGE ARROW ---- �u� SF SILT FENCE °"M�""Ey°•� INLET SEDIMENT PROTECTION BIOROLLS FURNISH, INSTALL, AND MAINTAIN SILT FENCE ALONG ALL PROPERTY LINES DOWNSTREAM 924/ i n, OF THE PROJECT AREA.(TYRI --------------- � FURNISH, INSTALL, AND MAINTAIN BIORO ALONG ALL PRO ELINE DOSTREAAOFTH PROJECTAR(ry EXISTING BUILDING f� - ANDERSON 13605 1st Avenue N. p100 Plymou[N• MN 55441 I ae-mn.com A"76350" 2.44000 Ie F 763, e12. 090 ELEGANT EVENT CENTER 3776 CONNELLY AVE ARDEN HILLS MN, 55112 SF—SF—%SF—SF—SF%!F 3 SF SF ys VANNEY ASSOCIATES, INC. —00 Q� a IORIPY xevo1arrwv [PAll BYSME a u \ FURNISH, INSTALL, AND MAINTAIN s11.1 uPEmnsloN No ZT " p SILT FENCE ALONG ALL PROPERTY I LINES DOWN STREAM OF THE PRINT NAMESNS IANEJ RWEBER PE WOF Txsrp PROJECT AREA. (TYR) SIGNATURE: NOT FOR CONSTRUCTION DATE: 0513012024 LICENSE NO. 65602 REVISION LOG ��� oMMPSTN.P W �EacNamP -- -- 0NaE I, I1aNr -- — uNrLDT NIDPE., -- / NLErvao E ON PLANNING COMMISSION MAY 30, 2024 � o6slcx6D. / Mw DRAWING TITLE \ / wNE TErI L— xx -1); rT EROSION z:l_ _ --/ ' CONTROL PLAN ® MINOR ADJUSTMENTS TO EXISTING ) GRADES ARE ANTICIPATED WITH THE MILL FURNISH, INSTALL, AND MAINTAIN AND OVERLAY OPERATION. EXISTING ® INLET PROTECTION AT PUBLIC GRAD ES ARE SHOWN FOR REFERENCE. / % INLETS IMMEDIATELY MILL AND OVERLAY DESIGN BY OTHERS DOWNSTREAM OF PROJECT. TWO ANTICIPATED. DRAWING NO. C4 r1 a0 I PLOTTED: 1 COMM. N0. 18065 PRELIMINARY PLANS NOT FOR CONSTRUCTION ri a,M 1C EXISTING TREE Q o 0 20' 40' L DI LEGEND ® PROPERTYUMITS A N D E RS O N Ck® ROCK MULCH EXISTING TREE CANOPY M4 11 Plymout M1, MN 55441 ee-mn.com I KEYNOTES v753.4Lz.a6Do F763.43z.4D90 11.11 11 R I.A ©o. eng[n erVne o1 M u o, 1Q ROCKMULCH ,o'o' o +DI NOTES 1DI 1. EACH SPECIES IN PLANT BED MIXESTO BE ++gQ ++ EXISTING BUILDING ++o' EVENLY DISPERSED THROUGHOUT ENTIRE PLANT BED. ELEGANT EVENT CITY CODE: REQUIRED PLANTING CENTER I• \ CONNELLY AVE DEVELOPMENT cA ZONE: GENERAL BUSINESS DISTRICT B2 ( ) _ I - "--- _.. , •__ , .' - ., '• '• aM REQUIRED PLANTING: 3776 CONNELLY AVE I ,, 1. 1325.05 SUBD. 1. ITEM C.1 -MINIMUM REQUIREMENTS. IN ALL DISTRICTS, ALL DEVELOPED USES SHALL PROVIDE AND MAINTAIN A LANDSCAPED AREA ARDEN HILLS MN 55112 I ++ + ACCORDING TO THE MINIMUM REQUIREMENTS IN SECTION 1320.06, THE 1 DISTRICT REQUIREMENTS CHART I 13 2. 1325.05 SUBD. I, ITEM FA - MINIMUM SIZE AT TIME OF PLANTING. 1 A) TWO AND ONE-HALF(2 .5) CALIPER INCHES FOR DECIDUOUS TREES. B) SIX(6) FEET IN HEIGHT FOR CONIFEROUS TREES. VANNEY ASSOCIATES, INC. GB I O O O G0 �o� O .Go O O po. GQ • 3. 132SUBD. 1, ITEM F.5 -TREES ALONG STREET FRONTAGE. A MINIMUM ONE OF ONE TREE SHALL BE PROVIDED ALONG THE RIGHT OF WAY FOR EVERY FIFTY(50) FEET OF PUBLIC STREET FRONTAGE. O O 000 1 o0 000o 4. 1325.05 SUBD, 1, ITEM F.6- PERENNIALS AND SHRUBBERIES. AT LEAST TEN 0) PERCENT OF THE TOTAL LANDSCAPED AREA SHALL BE COVERED WITH pO. O 00000 Oo0 0000 E%ISTING TREE PERENNIALS ANDIOR SHRUBBERY AND BE PLANTED WITHIN THE PERIMETER OF PRIVATE AND DRIVEWAY oo. o 00 000 PTI rvc lied uxoex ixFu [sofa. i 1 r ISLANDS SHALL SUBD. 1 ITEM AL -PLANTING ISLANDS. PLANTING ISLANDS SHALL 5. BE REQUIRED BE REQUIRED TO VISUALLY BREAKUP EXPANSES PLANTING PRINT NAME fFFRFv w. oBnNBB, RLA Ck ck } + PARKING AREAS, TO PROVIDE SAFE AND EFFICIENT TRAFFIC MOVEMENT, AND TO DEFINE ROWS OF PARKING. PLANTING ISLANDS SHALL OCCUPY AT SIGNATURE: NOT FOR CONSTRUCTION 18+ } / LEAST TEN PERCENT OF THE PARKING AREA. PLANTING ISLANDS SHALL E EDGED WITH CONCRETE CURBS. PARKING LOT PLANTING ISLANDS DATE: D5oDrz9za LICENSE NO. 1889 SEAL. BE A MINIMUM OF 150IN SQUARE FEET T AREA, BE OF APPROPRIATE WIDTHAND INCLUDE AT LEAST ONE TREE MEETING THE REVISION LOG EMENTS OF REQUIREMENTS OF THIS ORDINANCE. 0 } + + + + O o oo 1325.05 LANDSCAPE AREA: B2 ZONE REQ.20% OF THE SITE TO BE LANDSCAPED TOTALAREA OF THE SITE=94,543 SF: 100% _ LANDSCAPE AREA = 22,067 BE: 23.34% - - 1.5.05 LANDSCAPE AREA 'AT LEAST 10% OF TOTAL LANDSCAPE AREA SHALL - _ - BE COVERED WITH PERENIALS AND/OR SHRUBBERY' LANDSCAPE AREA = 22,585 SF : 100% GENERAL LANDSCAPE NOTES: AREA COVERED IN PERENIALS/SHRUBS= 5,214.5 BE: 23.08% 1325.05 TREE FRONTAGE CA -CS..' -- 1. LANDS CAPE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO SUBMITTING 11. WIND BURN OR OTHERWISE DAMAGED PLANT MATERIAL WILL NOT BE ACCEPTED. 21. FOR BALLED B BURLAP PLANT MATERIAL, REMOVE THE TOP HALF OF THE BURLAP STREET FRONTAGE =640 LF A BID TO BECOME COMPLETELY FAMILIAR WITH SITE CONDITIONS. FROM THE ROOT BALL. WIRE CAGES, STRAPS, ETC. SHALL BE REMOVED FROM EXISTING TREE COVERAGE 0 LF 2. ALL ROUGH AND FINISH GRADING TO BE DONE BY OTHERS. 12. CONTRACTOR CAN SUBSTITUTE MACHINE MOVED MATERIAL USING APPROPRIATE SIZE TREE SPADE FOR B & B WITH OWNER APPROVAL. THE TOP HALF OF THE ROOTBALL BEFORE INSTALLATION. = PROPOSED TREE COVERAGE 400 LF -- 22. ALL CONTAINER MATERIAL SHALL HAVE BEEN GROWN IN CONTAINER FORA PLANTED TREE MITIGATION: `7' TO BE PLANFOR EVERY 2" REMOVED` 3. NO PLANTING1325.055 SHALL BE INSTALLED UNTIL ALL GRADING, BUILDING, 13. THE PRACTICE OF STAKING SHOULD NOT ALLOW NAILS, SCREWS, WIRES, ETC. TO MINIMUM OF 6 MONTHS PRIOR TO INSTALLATION. CALIPER OF TREES BEING REMOVED ED CALIPER REMOVED - CONSTRUCTION, UTILITY WORK 8IRRIGATION (IF APPLICABLE) BEEN COMPLETED IN THE AREAS TO BE PLANTED. PENETRATE THE OUTER SURFACE OF THE TREES. 23. SHRUBSAND GROUNDCOVERSHALLBEPLANTEDAMINIMUM OF ONE HALFTHEIR CALIPER OF TREES BEING PLANTED =61" CALIPER PLANTED 4. ITISTHE RESPONSIBILITY OFTHE CONTRACTOR TOIDENTIFY ALL 14. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ALL TREE STAKES,GUYS, STRAPS AND TRUNK PROTECTION MEASURES FOLLOWING THE ON -CENTER SPACING FROM PAVING EDGE UNLESS OTHERWISE NOTED. PLANT SCHEDULE PLANNING COMMISSION UNDERGROUND CABLES, CONDUITS, WIRES, ETC., ON THE PROPERTY. COMPLETION OF THE WARRANTEE PERIOD OR AS DIRECTED BY THE OWNER. 24. DECIDUOUS SHRUBS SHALL HAVE MINIMUM OF FIVE (5) CANES AT SPECIFIED HEIGHT UNLESS OTHERWISE NOTED IN PLANT SCHEDULE. SYMBOL CODE QTY COMMON/BOTANICAL NAME CONT CAL MAY 30, 2024 5. IF THERE IS A DISCREPANCY BETWEEN THE NUMBER OF PLANTS SHOWN ONTHE PLAN AND THE NUMBER OF PLANTS SHOWN IN THE PLANT LIST, THE NUMBER OF 15. LANDSCAPECONTRACTOR IS REQUIRED TO PROVIDE THEOWNERWITH MAINTENANCE INFORMATION DURING THE GUARANTEE PERIOD RELATING TO 25. ALL PERENNIAL BEDS TO RECEIVE ROCK MULCH SHALL HAVE LANDSCAPE FABRIC TREES oESlcal[D: D SNN: uw UW PLANTS SHOWN ON THE PLAN WILL TAKE PRECEDENCE. WATERING, FERTILIZING, PRUNING, PEST CONTROL, AND RELATED ITEMS. THIS INSTALLED WITH HOLES FOR PLANTS CUT 2.5 TIMES THE DIAMETER OF THE / DRAWING TITLE A WILLBE PREPARED AND DELIVERED TO THE OWNER AFTER PROVISIONAL CONTAINER. y1`V'/; c 5 ACEBPLninrvolDEscalMsory KING "' IF CAL, 6. ALLPROPOSED PLANT MATERIAL SHALL BE LOCATED CAREFULLY AS SHOWN ON INSPECTION APPROVAL HAS BEEN GIVEN BY THE OWNER AND/OR LANDSCAPE THE PLAN. IF THE CONTRACTOR BELIEVES AN ERROR HAS BEEN MADE ARCHITECT. 26. LANDSCAPE CONTRACTOR SHALL PROVIDE AND INSTALL NURSERY GROWN "--,\ REGARDING SPACING OR LOCATION OF THE PLANT MATERIAL INDICATED ON THE PLANT MATERIAL CONFORMING TO THE REQUIREMENTS AND , As s eae 2-tre-cu. PLAN, NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. 16. INSTALL CORRUGATED PLASTIC TREE GUARDS, WHITE IN COLOR, WITH THE SIZE RECOMMENDATIONS OF THE LATEST EDITION OF ANSI Z60.1 STANDARDS UNLESS ACESBu68uM AuiuMNsRIBB OF TUBE I-DIA.(MIN.) LARGER THAN THE CALIPER OF THE TREE TO BE OTHERWISE NOTED IN THE PLANS OR SPECIFICATIONS. 7. THE CONTRACTOR IS RESPONSIBLE FOR COMPLETE MAINTENANCE OF THE PLANT MATERIAL (WATERING, SPRAYING, FERTILIZING, MOWING, ETC.) UNTIL THE PROTECTED. 27. THEAC UNITS ARE NOTVISIBLE FROM SNELLING AVE. NORTH. 0 PT tz eae 6 HT Flrvus Muoo inrvrvfrvBAUM PLANTING WORKHAS BEEN ACCEPTED, BY THE OWNER. 17. LANDSCAPE FABRIC (FILTER MAT) TO HAVE A COMBINED WEIGHT OF 4.S5.5 OZ. 8. THE CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS TO PROPERTY DAMAGE PER S.V. FABRIC SHOULD BE U.V. STABILIZED AND HAVE A FIVE YEAR MINIMUM WEATHERABILITY FACTOR IN FULL SUNLIGHT. FABRIC TO BE PHILLIPS DUCK!R OR SURVEYED TREES TO BE REMOVED Om 5 MACROCARRA B&B 211DAL. DUERcus PLAN FROM PLANTING OPERATIONS AT NO COST TO THE OWNER. EQUIVALENT. SAMPLE REQUIRED FOR APPROVAL. Teel 3ptln m CmMtlan 6Mre Type 1 B,. B6eian 130 fair 1 SM- - TO REMAIN SYMBOL CODE QTY COMMON I BOTANICAL NAME CONT SIZE 9. ALL NEWLY PLANTED PLANT MATERIAL SHALL BE GUARANTEED THROUGH ONE 18. 3" DEPTH SHREDDED HARDWOOD MULCH SHALL BE INSTALLED UNDER ALL 2 evdtla 2Q0 Fir i 5- - TO BE REMOVED CALENDAR YEAR STARTING FROM THE DATE OF ACCEPTANCE ESTABLISHED BY TREES AND SHRUBS THAT ARE ISOLATED FROM GROUNDCOVER AREAS AND 3 Bvd4a 12D (n9tl i S6eao4 - TO BE REMOVED SHRUBS DR/iL^iING NO. THE OWNER. GENERAL SHRUB MASSES. 4 B 14a lTo Fir 1 S- - TO BE REMOVED 5 B 14c 125 Fir 1 S- TO BE REMOVED cx 1es IFLow, KABL foERsi[n Orvi' zCAL. 10, THE CONTRACTOR SHALL MEET WITH THE OWNER OR OWNERS REPRESENTATIVE 19. 3' DEPTH 170 1-1/2' WASHED RIVER ROCK SHALL BE INSTALLED OVER a Bmd4c 130 Fir 1 SiM.aotl _ TO BE REMOVED cA ss cONi scu. ON SITE WHEN THEY FEEL THE PROJECT IS COMPLETE ACCORDING TO THE CONTRACT DOCUMENTS. IF ALL WORK IS SATISFACTORY AND COMPLETE LANDSCAPED FABRIC AS INDICATED ON THE PANS B DETAILS. 7 Bmd4a 120 (botl 1 SiM.o98 _ TO BE REMOVED 8 B.»dUQ t35 Fir 1 SsflxwO TO BE REMOVED /'� DI its ABF Buses _NT. 5cu. L1 ACCORDING TO THE CONDITIONS OF THE CONTRACT DOCUMENTS, THEN THE OWNER MUST DECLARE THE PROJECT COMPLETE. THIS DECLARATION WILL 20. CALIPER OF TREES UP TO AND INCLUDING 4" SHALL BE MEASURED AT 6" ABOVE GROUND LEVEL, AND 12"ABOVE GROUND LEVEL FOR LARGER SIZES. 9 Mape.Npe2y te0 Fir 1 I¢mxaoa _ TO BE REMOVED 1D Mag4 Npvay 140 Poor 1 H3r4vaoG - TO REMAIN Z':S RArvTLSuuAcc rooAaAs + 69 33 CONT. 5GAL. CONSTITUTE AS THE BEGINNING OF THE ONE (1) YEAR WARRANTEE PERIOD FOR E ALL PLANT MATERIAL. THE OWNER SHALL PROVIDE A LETTER WITH SIGNATURE 1s Arvie YN RERRER cONr. scAL. PLOTTED: COMM. NO. 18065 STATING THE DATE OF ACCEPTANCE. PRELIMINARY PLANS NOT FOR CONSTRUCTION GENERAL LANDSCAPE NOTES: 1, LANDSCAPE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO SUBMITTING A BID TO BECOME COMPLETELY FAMILIAR WITH SITE 22. 3'DEPTH 1'TO 1-112' WASHED RIVER ROCK SHALL BE INSTALLED OVER CONDITIONS. LANDSCAPED FABRIC AS INDICATED ON THE PANS & DETAILS. 2. ALLROUGHAND FINISH GRADINGTOBEDONE BYOTHERS. 23. CALIPER OF TREES UP TO AND INCLUDING 4" SHALL BE MEASURED AT 6" MULCHSHALLSEHELD A N D E RS 0 N ABOVE GROUND LEVEL, AND 12' ABOVE GROUND LEVEL FOR LARGER SIZES. BACK 3' FROM BASE OF 3. NO PLANTING SHALL BE INSTALLED UNTIL ALL GRADING, BUILDING, a a n ALL PLANT MATERIAL CONSTRUCTION, UTILITY WORK& IRRIGATION (IF APPLICABLE) HAS BEEN 24. CRABAPPLE TREES SHALL HAVE NO BRANCHES BELOW 36"ABOVE THE 13605 Szt Avenue N. *101 COMPLETED IN THE AREAS TO BE PLANTED. ROOT BALL, AND HAVE NO'V'CROTCHES. 3"(WP.) 3'DEEP MULCH XMIN. TO PAVED MULCH SHALL BE HELD BACK 3" Plym out M1,MN".L I a - SURFACES FROM BA BE OF ALL PLANT MATERIAL p]63.412.4000 F]63.412n4090 4. ITISTHERESPONSIBILITV OF THE CONTRACTOR TO IDENTIFY ALL 25. FOR BALLED& BURLAP PLANT MATERIAL, REMOVE THE TOP HALF OF THE IF APPLICABLE e, PLANTING SOIL UNDERGROUND CABLES,CONDUITS, WIRES, ETC., ON THE PROPERTY. BURLAP FROM THE ROOT BALL. WIRE CAGES, STRAPS, ETC. SHALL BE -- - 3" DEPTH HARDWOOD MULCH ^^person EnF,neer,ne a+ M,^^es^+e, LUG REMOVED FROM THE TOP HALF OF THE ROOTBALL BEFORE INSTALLATION. PAVED SURFACE, OR LAWN 5. IF THERE ISADISCREPANCV BETWEEN THE NUMBER OF PLANTS SHOWN ON LAWN Ii MOUrvD PLANTINGSaLTo �F THE PLAN AND THE NUMBER OF PLANTS SHOWN IN THE PLANT LIST, THE 26. ALL CONTAINER MATERIAL SHALL HAVE BEEN GROWN IN CONTAINER FOR A suRFACE II -III- I -III -III -I FORM SAUCER AROUND NUMBER OF PLANTS SHOWN ON THE PLAN WILL TAKE PRECEDENCE. MINIMUM OF 6 MONTHS PRIOR TO INSTALLATION. Jb MI II'• II IPERIMTEROFFuNTINGS IN. b MIN - - - III III III IUNOISTURBE OR - - L �� - ELEGANT EVENT 6. ALL PROPOSED PLANT MATERIAL SHALL O BELIEVESCAREFULLYRROR AS 27. SHRUBS AND SPACING SHALL PAVINLANTED UNLESS OTHERWISE E ONE HALF I�I[�][�][�][- -][ II MPgcTED BOIL 6' -�-T-III- BEEN M D THE PLAN. IF THE CONTRACTOR BELIEVES AN ERROR HAS THEIR ON -CENTER SPACING FROM PAVING EDGE UNLESS OTHERWISE III -III -III -III -III- I -III -II III -III -I 1 III-IIL-I ��� MIN. ��„ 1 -11,' J - BEEN MADE REGARDING SPACING OR LOCATION OF THE PLANT MATERIAL NOTED. Ja�aT7T7TaT - PLANTING SOIL II-III-III=III=III-II- INDICATEDONTHEPLAN, NOTIFY THE LANDSCAPE ARCHITECT PRIOR TO =I- INOMIDwL LINE OF PLArviING = --_ I__�UNDISTURBED OR COMPACTED SOIL CENTER INSTALLATION. 28. DECCIFIED HSHRUBSEIGHT LESS THE MINIMUMWISENO E FIVE(5)CANES AT III -III -III -III -III- i-III-III- 2 III -III- PITwHEN PLArvTED SPECIFIED HEIGHT UNLESS OTHERWISE NOTED IN PLANT SCHEDULE. IPLANTwG PIT x[IrvDly Dua -II-III-III-III-III-III111 111=III-III-III-III- CONT DIA -III-III-III illl-ILLY ]. THE CONTRACTOR IS RESPONSIBLE FOR COMPLETE MAINTENANCE OF THE PLANT MATERIAL (WATERING, SPRAYING, FERTILIZING, MOWING, ETC.) 29. ALL PERENNIAL BEDS TO RECEIVE ROCK MULCH SHALL HAVE LANDSCAPE &DECIDUOUS SHRUB PLANTING\CO NIFERUGUS SHRUB PLANTING UNTIL THE WORK HAS BEEN ACCEPTED, BY THE OWNER. FABRIC INSTALLED WITH HOLES FOR PLANTS CUT 2.5 TIMES THE DIAMETER x.T.s. x.Ts. 3776 CONNELLY AVE OF THE CONTAINER. ARDEN HILLS MN, 55112 B. THECONTRACTOR ISRESPONSIBLE REPAIRS TO PROPERTY DAMAGE FROM PLANTING OPERATIONSNS AT AT NO COST TO THE OWNER. 30. ANNUALSPLANTING TI PLANTEDONO AFTER JUNE15M SJUNE THAVE PPER LANT AT ANY MATERIAL ANNUAL PLANTING DONE AFTER JUNE 15 MUST HAVE PLANT MATERIAL 9. ALL NEWLYENDLANTED STARMATTING FROM SHALL BE GUARANTEED THROUGH APPROVED BY OWNER/LANDSCAPE ARCHITECT. ONE CALENDAR YEAR STARTING FROM THE DATE OF ACCEPTANCE ESTABLISHED BY THE OWNER. 31. ALL BOULDERS SHOWN ON PLAN SHALL BE INSTALLED SO APPROXIMATELY VANNEY ASSOCIATES, INC. 1/3 OF THE VERTICAL HEIGHT OF THE BOULDER WILL BE BELOW GRADE. NO 10. THE CONTRACTOR SHALL MEET WITH THE OWNER OR OWNERS BOULDER SHALL BE SET ON END UNLESS SPECIFIED. REPRESENTATIVE ON SITE WHEN THEY FEEL THE PROJECT IS COMPLETE (aRTREEAucuasTEEL ACCORDING TO THE CONTRACT DOCUMENTS. IF ALL WORK IS 32. LANDSCAPE CONTRACTOR SHALL PROVIDE AND INSTALL NURSERY GROWN GENTEN TREE IN HOLE UPRIGHT 3X FOOTBALL DIA. SATISFACTORY AND COMPLETE ACCORDING TO THE CONDITIONS OF THE PLANT MATERIAL CONFORMING TO THE REQUIREMENTS AND CONTRACT DOCUMENTS, THEN THE OWNER MUST DECLARE THE PROJECT RECOMMENDATIONS OF THE LATEST EDITION OF ANSI Z60.1 STANDARDS ee FGl_l rMra"cso1. SINGUESTRAIGHTLEADER COMPLETE. THIS DECLARATION WILL CONSTITUTE AS THE BEGINNING OF UNLESS OTHERWISE NOTED IN THE PLANS OR SPECIFICATIONS. T THE ONE (1) YEAR WARRANTEE PERIOD FOR ALL PLANT MATERIAL. THE �H=TllllRTRllA"` RIMS- MORTON OR OWNER SHALL PROVIDE A LETTER WITH SIGNATURE STATING THE DATE OF a DEmH WOOD MULCH ACCEPTANCE. DEDT LxDFx THE u TllR"TwsHED G)ROOTA nTOM of mE"sA'EoFMxx ra 11, WIND BURN OR OTHERWISE DAMAGED PLANT MATERIAL WILL NOT BE _ PRINT NAME: ACCEPTED. TONNISHGRADE G�'G`G OR TYPE 1 FERn "ER PINTT .S+ - RocN MUL JNOT FOR CONSTRUCTION i O 12. CONTRACTOR CAN SUBSTITUTE MACHINE MOVED MATERIAL USING - wUN.TGGCH SIGNATURE: APPROPRIATE SIZE TREE SPADE FOR B & B WITH OWNER APPROVAL. i I H I II IRI REIT I TO TN" less �" .r � �� u�C DATE: LICENSE N0. 13, THE PRACTICE OF STAKING SHOULD NOT ALLOW NAILS, SCREWS, WIRES, MARAL REVISION LOG ETC. TO PENETRATE THE OUTER SURFACE OF THE TREES. - IN AT TnovEMENTOF TFING ER (EGUAU SPACEDI. 14, THE CONTRACTOR WILL BE RESPONSIBLE FOR THE REMOVAL OF ALL TREE GA. _ - STAKES, GUYS, STRAPS AND TRUNK PROTECTION MEASURES FOLLOWING -IIIII-I II THE COMPLETION OF THE WARRANTEE PERIOD OR AS DIRECTED BY THE U1 1131I IIIFIII�III �II-� IFa -- OWNER. - II = -N oPEAND - m- aANT Rom RRuwTTwIrvER m li mm it li ii - it - 15. LANDSCAPE NTENAN CONTRACTOR FORMATION DURING REQUIRED THE GUARANPROVIDE ETHE OWNER RELATING WITH N IS MAINTENANCE INFORMATION DURING THE GUARANTEE PERIOD RELATING TO WATERING FERTILIZING, PRUNING, PEST CONTROL, AND RELATED ��CO NIFERUOUS TREE PLANTING UNDISTUREO OR COMPACTED SOIL -- ITEMS. THIS WILL BE PREPARED AND DELIVERED TO THE OWNER AFTER x.s - - PROVISIONAL INSPECTION APPROVAL HAS BEEN GIVEN BY THE OWNER - AND/OR LANDSCAPE ARCHITECT. 16, INSTALL CORRUGATED PLASTIC TREE GUARDS, WHITE IN COLOR, WITH THE SIZE OF TUBE 1" DIA. (MIN.) LARGER THAN THE CALIPER OF THE TREE TO BE PROTECTED. 17. CONTRACTOR TO FURNISH& INSTALL METAL EDGING AS SHOWN ON THE PLANS 8 DETAILS. METAL EDGING SHALL BE ALUMINUM OR STEEL, BLACK IN COLOR, WITH A MINIMUM THICKNESS OF 1/8• AND 4' DEEP. INSTALL 1 METAL STAKE EVERY 3-1/2 FEET OF EDGING. PLANNING COMMISSION 18, CONTRACTOR TO FURNISH & STALL PLASTIC EDGING AS SHOWN ON THE HT MAY 30, 2024 PLANS & DETAILS. PLASTIC EDGING SHALL BE MEDIUM DENSITYTREESECURE T. POLYETHYLENE WITH U.V. INHIBITOR, BLACK IN COLOR, WITH A TOTAL D IT EW DEPTH OF 5' N' DIA. TOP AND 4' SHAFT WITH 1.5" V EVERY 3-1/2 FEET OFTREE EDGING. H ML ML MLA ML DRAWING TITLE (UTREE STAKESEWRARPING EDRIlEN A2Rnu 3X FOOTBALL DIA. 19. LANDSCAPE FABRIC (FILTER MAT) TO HAVE A COMBINED WEIGHT OF4.5-5.5 RAnE (EouuLr spacsD) OZ. PER S.V. FABRIC SHOULD BE U.V. STABILIZED AND HAVE A FIVE YEARG_AUL MINIMUM WEATHERABILITY FACTOR IN FULL SUNLIGHT. FABRIC TO BE PLR MnTERUL .. PHILLIPS DUON R OR EQUIVALENT. SAMPLE REQUIRED FOR APPROVAL. S DEPTHwooDMULCH PLANTING 20. LANDSCAPE BED MULCH SHALL BE SHREDDED HARDWOOD MULCH. MULCH eMIN.oIaEARTHSAUCErT IEII.IPF (DlRoorAERAnory //� NOTES AND SHALL BE INSTALLED AT A DEPTH OF 3" WITH NO WEED BARRIER _ i I'TM��' C� LANDSCAPE FABRIC. ADJ/.CENTTO RNISHGRADE sLOPE/j�jj� DETAILS 21. 3" DEPTH SHREDDED HARDWOOD MULCH SHALL BE INSTALLED UNDER ALL FENT" iER PLORTA Ll ROORMOUGH TREES AND SHRUBS THAT ARE ISOLATED FROM GROUNDCOVER AREAS III TO AND GENERAL SHRUB MASSES.\ =LI�1 SE r I� IHI3181 II ETc�aerosioR j I�gII oll IIr I� Win= FII ""M nuowroa / FINIi�iF� r-II DRAWING No- Qo1�K'TNN' �m MOEDL TREE STA ESEDRMEN AWN. - B 11GRADE(SULAUYSPACED) - eoce oR e.ARTH SAu E" - II gII I II�TIT-II�II811I II -II I III II D RnL NA L2 DEB RDD.0 HOPE AND &DECIDUOUS TREE PLANTING MOUND MIN, x.T.z.+2 PLOTTED: COMM. NO. UNDISTURBED 01 COMPACTED $OIL - 18085 E EMERGENCY \ • f'• ^%• SERVICES VEHICLE �i1 EMERCENcv sEHVICEs vEHICLE TuxNlNc PATH Li 0 20' 40' LEGEND A N D E R S O N PROPERTY LIMITS y36o5 1st avenue ----- BUILDING SETBACKS Plymouth, Mx 55441 a e PARKING SETBACK P 763.412.4000 F 763.412n40�:�� n�a...o� N'nne5O1 EXISTING FENCE s a PROPOSED MI LL&OVERLAY - (DESIGN BY OTHERS) LA, DSCAPING (SEE SHEET Ll & 0 ELEGANT EVENT ® NO PARKING ZONE HANDICAP STALL DESIGNATION CENTER PROPOSED FULL DEPTH O ASPHALTPAVEMENT RECONSTRUCTION PER 3IC3 3776 CONNELLY AVE ARDEN HILLS MN, 55112 0 VANNEY ASSOCIATES, INC. a„.BSI �'2:<"•PRE<a,a t �Sr MmI?Is°ma,°. EMERGENCY SERVICES PRINT NAME', IAN 1, WEBER PE SIGNATURE: NOTFORCONSTRUCTION DATE: 0513012024 LICENSE NO. 525502 REVISION LOG PLANNING COMMISSION MAY 30, 2024 DESIGNED D". CHECKED g�".I a, 1.-11.4 —0 +,�Jr I DRAWING TIRE r9`,�fo2°. fl,� 9 - 114801 n ..,RFRUSFCLLElTION VEHICLE � PROFUE TRUCK TURNING MOVEMENTS PLAN DRAWING NO. C-A PRELIMINARY PLANS NOT FOR CONSTRUCTION PLOTTED: COMM. NO. 1eo65 PRELIMINARY PLANS NOT FOR CONSTRUCTION 0 20' 40. LEGEND A N D E R S O N -- II _ I-- — --__ _ -- --- --- --- E E 1 F E t EI T t f — M /9 F F ---_— �t PROPERTY LIMITS SETBACK OVERLAY EXISTING FENCE PA KIN PROPOSED 13605 1st Avenue N. p100 Pmuth, MN 55441 a Plya63.o412.4000 F1763.412 .40 nn "son n¢ neer na N nnezo�. T--- --- ` 0 (DESIGN BY OTHERS) LANDSCAPING (SEE SHEET L1 & �' ELEGANT EVENT NO PARKING ZONE CENTER ` HANDICAP STALL DESIGNATION /� ` `_ - EXISTING BUILDING '. E///€ O SNOW GE PROPoseD�FULLDEPTHION ASPHALT PAVEMENT RECONSTRUCTION PER 31C3 3776 CONNELLY AVE ARDEN HILLS MN, 55112 , / — E VANNEY ASSOCIATES, INC. — V SNOW STORAGE NOTES: IIIII I � r 111 E SNOW STORAGE LOCATION PRINT NAME' IANJ WEBER PE SIGNATURE. NOTFORCONSTRUCTION DATE 06Y3012024 LICENSE NO K502 REVISION LOGD66DB-06B6v— PLANNING COMMISSION MAY 30, 2024 DRAWING TITLE SNOW STORAGE EXHIBIT DRAWING NO. C-B PRELIMINARY PLANS NOT FOR CONSTRUCTION 0 20' 40' LEGEND A N D E R S O N PROPERTY LIMITS 13605 1I st AvenN ue p 0 « / ----- BUILDING SETBACKS III— 44 Mx 551 as mn 0 PARKING SETBACK An)63:on24000 of N F EXISTING FENCE / PROPOSED MI LL&OVERLAY _ (DESIGN BY OTHERS) LANDSCAPING (SEE SHEET Li& ELEGANT EVENT f� NO PARKING ZONE CENTER HANDICAP STALL DESIGNATION PROPOSED FULL DEPTH - - - 0 - ASP HALT PAVEMENT RECONSTRUCTION PER 3IC3 3776 CONNELLY AVE EXISTING BUILDING ARDEN HILLS MN, 55112 � PEDESTRIAN MOVEMENT f� VANNEY ASSOCIATES, INC. ll—R.ua 'ER MNNEsaTa .lTX EA—'lL.yl4 T. PRINT NAMES IANJ. WEBER PE t SIGNATURE: NOTFORCONSTRUCTION DATE: 0513012024 LICENSE NO. 55502 REVISION LOG PLANNING COMMISSION MAY 30' 2024 DRAWING TITLE PEDESTRIAN CIRCULATION PLAN DRAWING NO. Ci—Ci PLOTTED: COMM. NO. 18065 Attachment G SEE E�. oNaM, E� Frm ID ' RE—E sroPacE—M PLL GROUND MOUNTED MECHANICAL EQUIPMENT WILL BE SCREENED FROM VIEW BY NEW LANDSCAPING. MECHANICAL (��j^%- EQUIPMENT WILL NOT BE VISIBLE FROM THE RIGHT OF WAY ON--- - - - - - - - - - - - - - - - - - - - - - - - - - - V V THE WESTERN SIDE OF SNELLING AVE. SEE PLANTING PLAN LI. O �-/\J �b E L O O 2O EXISTING MECHANICAL UNIT EXISTING MECHANICAL UNIT � EXISTING MECHANICAL UNR xENnvE /J Exisrixc FFHCE` I I . . . . . .. SEE CML FOR LOCATION OF TRASH ENCLOSVRE. FINISHER MP-1 TO LEVELwnx000xsiu. bYN V-V �V WV `TV tTV V-V V-V `TV `TV �V I MATCH BUILDING EXTERIOR 0 STII' sraxncExmM iii O 1II � '�'{��J-®,(}'�' ®TV O�V VV I'�yf�-®,(�"I "�j{�,j-®,(�'I"I "�j{Q-Q,(�'I' OTYd OTV ®TV I'�'{jQ-Q,(�"I VV �`/j�-Q,(�' ®TY✓ =%.R ROOM 119 O O 11 II III III III III EVENTSEATING gam' III III II 11 III III III III py� III III SUMS!.-IsO O�--V, V--V V-V, V�G. V�-% >B VV. V-V• s�xso 7� � �vE�cx�m 000A saoa DOOR FOR DELIVERIES. DELNERIEB WILL OCCUR DURING NON -BUSINESS HOURS. xEx sroaEr E� O Qa a O ul yE "�vvY" ROOM swEE rx 4�T OTT V-V V-V 0>V OY�A V-V �!4 118 Q APIBovALI18 SPRINKLER I� F-R TO BE FOR MOPE wFORMAnoN SLo 11NosysreM. �w a olNo uvELypoas�uP Ex¢nxc FArro o � M sLa m I uvuwsTM 00085lu. .y s io xo w O n FIT PLAN s®x ELEGANT EVENT CENTER FLOOR PLAN 3776 CONNELLY AVE ARDEN HILLS, MN OJT F1 n �T �1 J J L E, x 1� 1 No. Description Date TYW MERITS rNERS 05/30/2024 A2.0 E V E N T C E N T E R 2 CITV COMMENTS �75/2024 -------------------- - - - - -- °0-------------------- o8 L I BRIDE & GROOM SUITE ENTRY & EXIT 117 oFFNw.LL O JR iii O 1 MAIN HALL 0DELIVERIES & EMERGENCY EXIT 000 SIRINKLIR Q o O °" RESTAURANT ENTRY &EXIT � F� oKE"NFo M` O .� `wSi1HGP"¶° EVENT CENTER ENTRY & EXIT n ENTRY ACCESS PLAN 118 ELEGANT EVENT CENTER ENTRY ACCESS PLAN VA 3776 CONNELLY AVE ARDEN HILLS, MN OJT F1 ANT VANNEY ASSOCIATES, o. n 'o a LE A 1 ARCHITECTS I DESIGNERS A2.0.1 2 CITV COMMENTS 7H52024 05/30/2024 EVENT C E N T E R 11 ILI ALL GROUND MOU.. B, CHANICAL EQUIPMENTCHL IC — SCREENEDFROMVIEWBYNEW LANDSCAPING. TWILL MECHANICAL EQUIPMENT WILL NOT BE VISIBLE FROM THE RIGHT OF WAV ON ------------------------ Q THE WESTERN 310E OF SNEL-- SEE PIAMING PLAN Lf. V BRIDES ----------- O ----- 0 0 0 �^ Ol A BOARD GAMES ART58CRAFTS ADULT EDUCATION ° O o FOR 20SEATINGTAFFM MEMBERS. AND 2-3 STAFF MEMBERS. 0 "SSYY DOOR FOR DELIVERIES. DELNERIE3 WILL OCCUR DURING NON -BUSINESS HOURS. 4d q O O O FXERCISEBGROUP FITNESS DROP OFFAREA FOR FUTURE ADULT DAYCARE ZLI ELEGANT EVENT CENTER 3776 CONNELLY AVE ARDEN HILLS, MN O5 30/2024 FUTURE ADULT DAY CARE PLAN A2.1 ELEGANT E V E N T C E N T E R m CANOPY -SOUTH CANOPY - EAST v4" = r-o e n SOUTH CURVED ROOF GABLE 118" =1'-0" mmmm l Igoo �lh w v ---------------- - w s I ELEGANT EVENT CENTER 3776 CONNELLY AVE ARDEN HILLS, MN 05/30/2024 A5.0 V EXTERIOR ELEVATIONS EXTERIOR FINISH MATERIAL CALCULATIONS GROSSAREA(SF) PRIMARYMATERIAL TRIM B DECORATIVE %ACCENT MATERI (SF) ACCENT MATERIAL (SF) EXTERIOR FINISHES MATERIAL PRIMARY OR COLOR PERCENTAGE OF ACCENT TOTALBUILDING EXISTING TRANSPARENCY REQUIRED PROPOSED PROPOSED TRANSPARENCY% TRANSPARENCY% TRANSPARENCY% TO 12W (FULLELEVATION) ELEGANT E V E N T C E N T E R SIGNAGE 'Lp FREESTANDING POLE SIGN NOTE: THE EXISTING FREESTANDING POLE SIGN WILL BE REUSED IN ITS EXISTING LOCATION. IT CONSISTS OF A TWO-SIDED CABINET SIGN MOUNTED ON A POLE. IT IS INTERNALLY LIT WITH LETTERS ON TRANSLUCID FACES. THE INTENT IS TO UPDATE TEE SIGN FACES WITH ELEGANT FONT AND LOGO, WALL MOUNTED SIGN NOTE: THESE SIGNS WILL BE REVERSE CHANNEL CONSTRUCTION WITH INDIVIDUAL LETTERS. THE FACE AND SIDES OF EACH LETTER AND WILL BE SOLID AND OPAQUE. THEY WILL BE HALO LIT BY USING INTERNAL LIGHTING WHICH IS EMITTED FROM THE BACK OF EACH LETTER. EACH LETTER IS MOUNTED AWAY FROM THE WALL SURFACE BEHIND IT. THIS ALLOWS THE LIGHTING TO HIT THE BUILDING MATERIAL ON THE WALL SURFACE BEHIND THE SIGN CREATING THE HALO EFFECT. FRIEST R INNO FREE$IG mEEBTANdNa roLEeloxla.aef � I nuoWA&Eo1NA - IL�� I ts.lxssl=xa.a m F•�Nf CE ILI J roiALcowAnek xxxsF oWA&EudA. xS SF Da y FREESTANDING POLE SIGN ELEVATION Qe Qe /1 NORTH EXTERIOR ELEVATION - EVENT SPACE re" =1'-0" n WE T ELEVATION V 1/V -1'-0" cU cb 6 cU N ID cU cb N tU cb tb tU cb II it L SIGN ELEVATION -EVEN CEMER ENTRANCE (EASTI = r-o" � I t1, tl> <I1 I I)> 1F 119I�Ipy_���[Y, P{IIry' t`I �,'�— �ildi�d�lJJd 2Ld V it Ii {�T'E V- _ IL�9lF RA_CAI€CJ T",`L''' 1� O E WALL SIGN ELEVATION -EAST , as 8 El El O -SOUTH /7 ENLARGED PLAN - TRASH ENCLOSURE 114 ELEGANT EVENT CENTER 3776 CONNELLY AVE ARDEN HILLS, MN 05/30/2024 m 0 /„ TRASH ENCLOSURE -EAST n TRASH ENCLOSURE - WEST TRASH ENCLOSURE -SOUTH o TRASH ENCLOSURE -NORTH em�unw Da n NORTH EXTERIOR ELEVATION - LOBBY mc TRASH ENCLOSURE FINISH SUMMARY MATERIAL AREA (BE) USED EXTERIOR FINISH MATERIAL CALCULATIONS GROSSAREA(SF) PRIMARY MATERIAL TRIM & DECORATIVE % ACCENT MATERIAL (SF) ACCENT MATERIAL (SF) EXTERIOR FINISHES MATERIAL I PRIMARY OR COLOR PERCENTAGE OF EXTERIOR ELEVATIONS & SIGNAGE A5.1 ACCENT TOTALBUILDING ELEGANT E V E N T C E N T E R F : C:\Users\Nathan David\Documents\AAG132WGi32 Layouts\Anderson Engineering\Elegant Event Center\Elegant Event Center.AGI ame: Elegant Event Center.AGI atco Products, Inc. 110 Heartland Blvd. Brentwood, NY 11717 : As Noted Lighting Layout: Version A Job Name: Elegant Event Center 5/23/2024 Drawn Bv: Nathan Prepared For: Anderson Engineerin �SAT�CO� I NUVO9 Luminaire Schedule Symbol Qty Tag Label Arrangement Lum. Lumens LLF Description Lum. Watts Arr. Watts Total Watts O-E] 5 65-840-4_B2B Back -Back 13794 1.000 LED Area Light Type IV; 100W; Bronze Finish; 5000K; 120-277V LED Area Light Type 111; 100W; Bronze Finish; 5000K; 120-277V 100 200 1000 ]] 3 65-840_65-877 Single 12875 1.000 102.315 102.315 306.945 TARGET ILLUMINANCE: 2 FC READINGS TAKEN AT: 0" AFG FIXTURE MTG HT: 20' AFG 0 1.5 3.2 3.4 2. 1. 2 1.1 6.5 4.5 2.6 .7 .2 1.1 1.1 1.6 4 3.9 3.1 5.4 5.3 3.7 2.3 1.5 1.1 1.0 1.2 1.6 2. 4. 6 3 6.1 7 .1 3.1 3.1 2.4 1.7 1.3 1.1 1.0 1.1 1.4 2.0 3.0 3.8 3.8 2.9 1.8 1.2 0.9 7 0. 2.4 1.8 1.8 1.6 1.4 1.3 1.2 1.1 1.1 1.3 1.6 1.9 2.2 2.2 1.9 1.5 1.1 0. 0 7 0.6 1.6 1.1 1.2 1.2 1.3 1. 1.6 1.7 1.5 1.4 1.4 1.4 1.5 1.5 1.4 1.2 1.1 0.9 0.8 0. 0.7 0.9 1.0 1.3 1.7 2.3 .1 3.1 2.3 1.8 1.4 1.2 1. 1.3 1.4 1.4 1.5 1.4 1.2 0.9 0. .3 0. 0.7 1.0 1.5 2.3 3.9 5.5 5. 2.2 1.5 1. 1.2 1.4 1. .7 2.3 1.8 1.2 0. .4 0.� 0.7 1.0 1.7 3.2 6.1 7.4 7.5 5.3 2.7 1.7 1.3 1.3 1.6 2. 2.8 1.6 1.0 0.4 0.6 0.5 0.7 1.0 1.8 7 7.2 .7 8.2 5.8 2.8 1.7 1.3 .4 1.9 3.4 5.9 7I1 6.8 4.1 2.1 1.2 0.7 0 5 0.�-0.6 1.0 1.7 6.5 7. 7. 4 8 2.5 .6 1.3 1.5 2.2 4. ( 8.�J5.1 2.3 1.3 0.8 0 5 7.6 U.5 0.8 1.4 2.5 4. .5 4 8 �.1 9 1.4 1.2 1.5 2.2 4.1 7.4 7 2 7.5 4.6 2.2 1.3 0.8 0 5 0.4 0.7 1.1 1.7 2.4 3.0 2.6 1.9 1.4 1.1 1.1 1.3 1.9 3.2 5.4 6 3 5.5 3.3 1.8 1.1 0.7 0 5 0.3 0.5 0.7 1.0 1.2 1.4 1.3 1.2 1.0 0.9 0.9 1.1 1.5 2.3 3.2 3 9 3.2 2.2 1.5 1.0 0.7 0 5 0.4 0.5 0. 0.6 0 6 .8 .8 0.8 0.8 0.8 1.0 1.3 1.7 1.9 2 2 1.9 1.6 1.3 0.9 0 0.3 .3 0.4 0.6 0.7 0.7 0.8 0.9 1.2 1.5 1.6 1 8 1.7 1.5 1.2 0.9 0 C, n 5 .0 1.2 1.6 - 0 1.4 1.0- 5 2 1 2 1.1 1.4 2.1 .0 1.8 1.2 0.8 0.5 1.2 1.7 3.0 6.8 4.5 2.3 1.4 0.9 0.6 5.4-7. 0 1.2 1.9 3. 8. 0 . 6 2.7 1.5 0.9 0.6 7. 0 �--� . 6�--� 1.2 1.9 3.6 6.9 7.3 7.7 5.2 2.6 1.4 0.9 0.6 1.1 1.7 2.9 5.1 6.4 5.9 3.7 2.1 1.3 0.8 0.6 1.0 1.5 2.2 3.2 4.1 3.7 2.6 1.7 1.1 0.8 0. 1.0 i 1.3 1.8 2.3 2.7 2.5 2.0 1.5 1.1 (1: i 0.9 1.3 1.8 2.3 2.9 2.7 2.2 1.6 1.1 . 0.8 1.0 1.4 2.2 4 4 C, 4 3 .0 1.9 1.2 - 3 1.1 1.7 2.9 4 2.3 1.4 0.9 0. 0.8 1.1 1.9 3.6 7.9 .6 2.7 1.5 0.9 0. 6.9 ^ .5^ 0.8 1.1 1.9 3.7 7.8 5.3 2.6 1.4 0.9 0. 7.0 7.4 0.7 1.1 1.7 2.9 6.0 3.8 2.1 1.3 0.8 0. 5.2 6.6 0.7 1.0 1.4 2.1 3.2 4.1 3.7 2.5 1.6 1.1 0. 00. 0.7 0.9 1.2 1.6 2.0 2.3 2.1 1.7 1.3 0.9 0.7 0. 0.7 0.9 1 .1 1.4 1.6 1. B 1.7 1.5 1.3 0.9�\ 0.3 0.8 0.9 1.2 1.6 2.0 2 1 2.4 2.0 1.5 1.0 0.7 Gk0.4 � 7 0. 1.0 1.1 1.1 1. 1.0 1. 1 1.4 2.0 4 3 .3 2.1 1.9 1.2 0.8 .5 0.5 0.7 1. 1.6 1. 6 1.3 1.2 1.3 1.7 2.8 - 7 2.5 1.4 0.8 .5 0.5 0.8 1.2 2.0 2.8 3.5 3.3 2.6 1.8 1.5 1.5 2.0 3.4 7.8 .1 2.9 1.5 0.9 .5 6.6 7.7 1.4 2.4 4.3 6.2 5.7 3.7 2.3 1.7 1.6 2.0 3.4 7.8 5.8 2.7 1.4 0.8 0.5 6.7 7.6 -.--3.4 2.2 1.6 1.5 1.9 2.9 5.0 6.8 6.4 4.1 2.1 1.2 0.7 0.4 1.3 1.5 2-.-1 3.1 4.1 3.8 2.5 1.5 0.9 0.6 0. 1.4 0.6 0.4 0.3 Disclaimer:The Lighting Analysis ("Lighting Design") provided by Satco Products Inc. represents an anticipated prediction of lighting system performance based upon design parameters and information s These design parameters and information provided by others have not been field verified by Satco Products, Inc. and therefore actual measured results may vary from the actual field conditions. Satco Pr recommends that design parameters and other information be field verified to reduce variation. Satco Products, Inc. neither warranties, either implied or stated regarding actual measured light levels or en levels as compared to those illustrated by the Lighting Design. Satco Products, Inc. neither warranties, either impliedv or stated, nor represents the appropriateness, completeness or suitability of the Lig as compliant with any applicable regulatory code requirements except for those specifically stated on drawings created and submitted by Satco Products, Inc. The Lighting design is issued, in whole or in documents for informational purposes and is not intended for construction nor as being part of a project's construction documentation package. Calculation Summary Label CalcType Units Avg Max Min Avg/Min Max/Min Description PARKING LOT Illuminance Fc 2.26 8.2 0.3 7.53 27.33 Page 1 of 1 Meter Type Horizontal Scale: 1 inch= 24 Ft. EXTERIOR LIGHT FIXTURES Status Fixture Type Finish Wattage Lumen Output OCT (Ke Mir) Temperature IP Rating Indoor or Outdoor Fixture Technology I CRI Voltage Rated Fouls Operating Temperature Dimmable _ Dimming Note Photocell or Sensor Lens Material NUVO 65-840 10OW LED AREA LIGHT TYPE I II Active Area Light Bronze 11 W 13793L 4000K Cool White IP65 Indoor, Outdoor LED 80 12OV-277V 50000 -40C {-40F) to +45C (+113F) Yes -Dimmable 0-10V Dimming Optional Palycarbonate (PC) Surge Protection BuiltInsurge protection - 41KV Weight (lb.) 7.88 Material Die-cast Aluminum Height (in.) 3.11 Width (in.) 12.4 Length (Ir.) 20.71 Safety Listing _ cULue - Certified Location Rating _ Wet Energy Star No DlC Approved Yes Di ID PLVSBYUF3507 ADA Compliant No B.U.G. Rating B3-U2-G3 Dark Sky Compliant No CA T20 ! T24 Rationale T20 Exempt - Fixtures Not Regulated California Status Lawful for sale in California Title 211124 Status Lawful for sale California Prop 65 Lead Rol Compliant Yes FCC Compliant Yes SDS Shoat LED —Fixture Additional Information Powder Coated Specification Note Type III Light Distribution Includes 23/8 inch Slip4i ler Mount Warranty 5 Year Limited - Fxtures N U VO 65-877 AREA LIGHT CUTOFF SHIELD Copyright 2023 Satco Products, Inc. All Rights Reserved Status Active Length (In.) 11.93 Width (in.) $A$ Height (in.) _ 5.67 Finish Bronze Each UPC 045923653209 Finish Family Additional information Bronze 65-840, 65-84 0-4, 65-843-5, 65- 841,65-841-4,65-841-5,65-B42,65 - 842 A, 6" 42-5, 65-843,65-843- 4,65 $43-5,65-846 , 65-846-4, 65- 846-5,65-847, 65-8474,65-847- 5,65.848,65-848-4, 65-848-5, 65- 849, 65-849-4, 65-849-5,65-850,65- ForUse With 851,65-852,65-853,65A56,65- 857, 65-858, 65-859,65-860,65- 8604,65-860-5,65-661,65-B61- 4,65 $613,6"62 , 6"62-4, 65- 862-5, 6" 63, 65-8634,65-863- 5,65 -866,65.8664,65-866-5,65- 667,65-867-4,65-B67-5.65-B68,65 - 868A,65-868-5,65-B69,65-B69- 4,65-869-5 California Prop 65 Lead Rol Compliant Yes For More Information Visit'. hltosalwww.satco.comf J EXTERIOR LIGHT FIXTURES Ansel 7" High Textured Black Outdoor Wall Light QEM IV DESIGN CHAT VIEW IN YOUR ROOM Product Details Use the Ansel outdoor wall light to make your bathroom or hallway brighter. Additional Info: Simplify your complementary lighting scheme with the Troy Lighting Ansel 7" textured black and opal shiny outdoor wall light. This subtly stylish light fixture has a strong iron and steel frame and can be installed on the wall or ceiling, opening up more lighting possibilities. Use this modern light fixture to round out the look of your bathroom, hallway or living room space. 0 TROY LIGHTING Shop all Troy Specifications • 7" wide x 7" high. Extends 6 1/2" from the wall. Round backplate is 5 1/4" wide. Shade is 7" wide x 4" high. Weighs 8 lbs. • Uses one maximum 60 watt standard - medium E26 base bulb (not included). • Mid -Century Modern outdoor wall light from the Ansel collection by Troy Lighting. • Textured black finish over iron and steel frame. Opal shiny glass shade. • Dust with a soft dry cloth. • UL listed for damp locations. • May be installed on the wall or ceiling. • Suitable for indoor or outdoor use. 0 30 -A. SEH Building a Better World for All of Us® TO: FROM: DATE: RE: Rose Kukwa, MSHSS President/CEO Opportunity Community Services Inc. Erin Jordan, PE (Lic. IA, MN, NE, WI) June 10, 2024 Event Center Traffic Study SEH No. P179481 Attachment I MEMORANDUM The City of Arden Hills, Minnesota has requested a preliminary traffic study be completed by the Owner for the proposed development located at 3776 Connelly Ave, located on the northeast quadrant of the Hwy 51 and County Road E interchange. This technical memorandum summarizes the findings related to estimated traffic demand from the proposed development and its potential impact to the surrounding roadway network and adjacent businesses. SITE & PROPOSED DEVELPMENT OVERVIEW The site currently has an existing 11,025 square -foot (SF) building which serves as an indoor bingo hall and is zoned as General Business District (B-2). The site is accessible through one driveway located on the western corner of Connelly Ave. Connelly Ave curves around the north side of "Flahertys Arden Bowl" bowling alley and intersects with County Road E in two locations. The western intersection of County Road E and Connelley Ave is controlled by a signal; the eastern intersection is stop -controlled on Connelly Ave. The proposed development will repurpose the existing building footprint (11,025 SF) as an indoor event center ("Elegant Event Center"). The building's capacity is approximately 515 people. The operating hours are tailored to suit the community's needs, ranging between 8 AM and 11:59 PM Monday through Thursday and between 8 AM and 3 AM on Fridays, Saturdays, and Sundays. Adult Day Programs will be provided between 8AM and 4PM Monday through Thursday. The additional improvements include: • Demolish existing covered parking structure • Thickened edge sidewalk • New bituminous pavement • ADA upgrades, including ADA parking/access aisles (5), ADA ramp, truncated domes, and ADA landing • 9'x18' parking stall sizes • Adhere to parking setback requirements and removing parking closest to the entrance • Concrete sidewalk • Landscaping features See Attachment A: Preliminary Site Plan. Engineers I Architects I Planners I Scientists Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-3507 SEH is 100% employee -owned I sehinc.com 1 651.490.2000 1 800.325.2055 1 888.908.8166 fax Page 2 TRIP GENERATION The Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition, was used to calculate the estimated traffic generated from the existing Bingo Hall and the estimated additional traffic generated by the proposed Event Center. It should be noted that the data provided by ITE only provides one data source and should be used cautiously due to the limited sample size. However, Table 1 does show the estimated trips entering and exiting the existing site during the weekday AM and weekday PM peak hours if the building was at approximately half of its capacity (250 people) Table 1: Existing Trip Generation Summary Bingo Hall 250 People' 35 3 38 1 10 1 110 120 Notes: 'Assuming half of the Bingo Hall's capacity for comparison purposes. 20nly one data set provided by ITE for a Bingo Hall, no daily trip generation estimates are With the existing land use on site, a total of approximately 38 trips enter and exit during the AM peak hour and 120 trips enter and exit during the PM peak hour. A trip generation review was completed for the proposed event center development. However, the ITE Trip Generation Manual does not provide trip generation data for venues comparable to the proposed site. Instead, new trips were estimated based on information provided in the site plan (Attachment A) and the following assumptions for a large, maximum capacity event: • The site plan estimates that the venue has a 515-person capacity and will include a surface parking lot of 145 parking stalls (including 5 ADA-accessible stalls). It is assumed that all event parking will be on -site and no parking will occur outside of the designated surface lot. Trip generation analysis uses the parking capacity to estimate the new trips. • Trips will enter and exit at the current driveway. • 10% of people will arrive prior to main peak hour for other attendees (staff, vendors, etc.). It is assumed that there will be one vehicle per attendees that arrives early (15 vehicles). • 90% of vehicles will arrive during the same one -hour period. It is assumed that attendees will carpool to the event, with approximately 3 people per vehicle (130 vehicles). • Larger events are expected to last longer than one hour, so it is assumed that new trips will be entering and exiting during different hours. • The venue includes a reception area, which indicates that the exiting traffic will be dispersed over 1-2 hours. Therefore, a lower rate for exiting vehicles is applied. Based on these assumptions/factors, the following rates are approximated based on the venue's capacity': o Entering: 0.25 with 100% entering (130 trips) o Exiting: 0.12 (0.25 x 40%) (62 trips) Based on these assumptions and using the maximum on -site parking capacity of 145 spaces, the venue could generate approximately 130 entering trips in a one -hour period prior to the event and 62 exiting trips after the event. It is expected that the peak activity will occur on a weekend evening, during off-peak hours from adjacent street networks and surrounding businesses. Compared to the existing Bingo Hall use, there is an additional 120 trips entering in one hour and fewer trips (48) expected in the exit during one hour. ' Spack, M. (2018, February 13). Estimating Trip Generation and Distribution for a Wedding Venue. Mike on Traffic. Retrieved from mikeontraffic.com Page 3 As a conservative estimate, the proposed development is expected to generate less than 400 trips in one day (including the weekday, Adult Day Program activity), which would likely be on a weekend, with an evening event at maximum capacity. TRIP DISTRIBUTION As part of this preliminary study, traffic counts were not collected at the study intersections/driveways. Based on MnDOT historic daily traffic data collected in 2022, there are approximately 6,800 daily trips on County Road E west of Highway 51 and approximately 13,300 daily trips east of County Road E east of Highway 51. This existing distribution of traffic was used to approximate the number of trips entering and exiting the single driveway. It is understood that traffic would likely enter from Snelling Ave interchange from the south, but for this preliminary review it is assumed that all traffic will enter/exit on County Road E. The following assumptions were made regarding the trip distribution activity to demonstrate a "worst -case" scenario: • 40% of traffic comes/goes from the west along County Road E o All traffic will enter and exit using signalized intersection at Connelly Ave • 60% of traffic comes/goes from the east along County Road E o All traffic will enter and exit enter signalized intersection at Connelly Ave Based on the above trip distribution assumptions, the following PM peak hour trips are expected to be generated by the new development: • Site Driveway on Connelly Ave: o Peak Hour Entering (1 hour before event) ■ Northbound Left: 130 vehicles (100% x 130 trips) o Peak Hour Exiting (after event) ■ Southbound Right: 62 vehicles (100% x 62) • County Road Eat Connelly Ave (Signal): o Peak Hour Entering (1 hour before event) ■ Eastbound Left: 50 vehicles (40% x 130 trips) ■ Westbound Right: 80 vehicles (50% x 130 trips) o Peak Hour Exiting (after event) ■ Southbound Right: 25 vehicles (40% x 62) • Southbound Left: 37 vehicles (60% x 62) CONCLUSION Based on the results of this preliminary traffic study for the proposed Event Center development at 3776 Connelly Ave, the anticipated traffic generated is not expected to impact the operations or safety of Connelly Avenue nor its intersections with County Road E. It is expected that the peak hours of events may conflict for a short amount of time with other adjacent businesses, but it is recommended to monitor the activity to understand if any recommendations or control should be implemented. It is expected that the signal at County Road E and Connelly Ave will be able to accommodate the additional entering traffic for maximum capacity events. However, it is recommended that the City monitor the timings and make minor adjustments as needed to accommodate the additional demand from the redevelopment. ekj Attachment A: Proposed Site t:\sptr\users\ejordan\pursuits\2024.06.07 arden hills traffic study\2024.06.07_3776 connelly ave event center traffic study.docx 2 g;: e )r !) 32 2 K w j , . LU J\} \ \ - \\ \ o ��f!} _`~\§) E G ]) «f )(!:)\§ ( ! j z \ ;! _ (( } . - ® - ; \ \� — - --- « -- \ § /(®) - |§\f a $ O zv— Z <\ Z 2 \j Y 75 � � C� r`§ 2 ! 2 W _- W - _ 2 W- � W = 2 S. _ - � - U W � W r! k \ \; ( § \z / | !:§, ! _ k a (\\\ Co o \ ( o z I. Z aao o z w o O Z w S,', o s O N RED > �' >z ag z �e �� J �$ Z oo c4 W z z z-- €� _ J �' �" O U CJ o = z r Faa7z W z W zds Q w- zN > > w,aF0 o<o'o ' Q o wg w, I.- w w z goo a,5saa o d pzz- N z a xp awo� aww F`°cai ° iw zm w ai �'>odz z>ozz� �' z w zo�� z z a i uo =LLzww xzaLLz=g - - ww-� �N w o y y y W_ �w 8'a °zwi>'a °zoo w w w �B rcrc3m3 rcac5no' rc� rc w o - -g Nk z I it _yS (W.7 x o z a p w p a ua� oN� I z W J - W U¢n r 00 0 000000 p��w wo -1° - w w z- --i a3 rc o aj it w -_0 0 - m� _ fi 0 Z 1 �� wa �w a zw_ z 0 - - off o ►- —_ =g - o U O 85 7 ££� ° "'o �' w3. w Z I / \ rc� 30 �� I1LQ O �rc ig Sp ' °z33 0k- / z yt / I ti -O- I I K i -_ o._ P. _ - oo Iz, w w -�z. z. I ► I �� w wag O II w - < - <s po 0� I I j I z8. U go a I og so _ m:w p oww_ o o "°t xo �o8x 0 w4w �.zz,o oo �o €o 00 €oaw Syr o _ m Z " aaw o z o O z w z € o g z N 'E >w > a a�g z.o N za s III oC �� ZJ o =g w - p o� a� CO W w zo =� J a a y W z U 1 fn Z w �o Z Fos _ g a o f �aonu � - �g liliiiiiiiii LU zo y _ z �o w x w w = =a w N w os a o <. �N LLIS _ w -- _ 'LL F a w z_ two o<= 8�LL m �_� 91 Ow i '� a 5� °z i 'w lww yy a� a r 3 L w Z. H3 m - 3 --F°a o z a a- - ��_u 3 3 i S w m g s - o Qua w < � & wvyNoyFogy Z �� mp oz_z_z J w �Rp9` 89`3 m <a m pwy�p o o m w Q � _ X\ go lO I gAl � ii O b y i S ® ®�® O 0 .� � �•• a" �© ail SSa�o�o 8 "`��a'& i ___x.______ - - L 3m wz ?� '6z I m� m I O w A. � � I g:�"pw � VX°X w€ mom sae�e;� O e i z - aim mg w m O Oq°o 8$ m m �o p ywo�az�� m 3 - o 6L a i o ax m =� .p sago o"Ma Eg" map= o .t m Rio° Ws` sa Mw$MM --- m3 Apo m o„Ezw''o �gH w.,gg P �mw�um€Y'ggy&3e& g m o G� m-=m , - -s MIM w <ss=.s:u °mo">a �I cw7 r "erm� mm"" g9 .. W LU r Z Q III LU Z UO W o_ Z Z z 5 xn CCD cw) Z LU �o w a �Eea w "¢ z K o w o o 0 o i w a o z w c J w K z z z w — w 0 0 h J m BE o III 1 w � I I 1 ,x• >h o " g_!� I Rh `a y ' o< w o u o o I I o3o� Ew 010 °� =c= p�* W 60 « 5Zorca j I r °wNErc<em°rc'O� Z4'yp%<6"63 �X w 3°an>b Ij w (7 ��5 m sg o� I j I MZ 2;3E� %-44i -ay5 s� 39�go t �1 ggg ail A I I H, MnO I I j l I e =�BQ egg' gge§g l- gay 5g I tF HN =i as pw to a q pg oQ y 11 i" p8 s 9a9Y ^s i3w i i 3i 4 o °€ i gig irl's� gga Ps �` �i 8•.m aa€7 I I In _�� 1 O 13 ^q3W Y4K£ x u 6 0 w i71 b5Pei5o €� � ,i xs ff ia� §a io'- § ag i 8e €ry 5 €em i os � �i5 ` I w @a a x g H a= a.P ogNil�� s a 'g g €s 3 os $ i a agi =a x� �1 , Hl; ie I € I f a gp�l. gg gm§� oii e y dQ sm�mw:.. d€ si is m ie 9 H aw o� Z w Z Fg is Z g g �e Oa awl€ .-A — J F p 0 e o~€ J u)O v s > O U Fa.w Z w waa p— oo mwrc a o H.—H 3w NZOOU os xXW; adz°iE k �^ HON xx &Ng >k 9 i� ,;=w.1 wyw= wwo ° i�''Z �w2ow O ao3� m i II F'g.g� maw W.<W8 KQO oo QQdu J ob �ww�o �Wwo. --ya aria rr � = zwOC �\ ¢� wd z� o N IIz z y L ram;''' ' wil! I �wysr� I® gall. .r ~ im _ON =-r �`...•.... �I IIl ll `r.��WJi a: Abu 1RBRBRRRRR 0 1 xfMNM' I'%N,� NIRIM° I'Mx,� plH�� _ -- ----------- -- -- ------ �- -�Imlwl � 11M _ra L-A I W11 W7 �J l.'�•'"+�,�6�h'. 1�✓ ,qm V tua. .. r FREESTANDING SIGN FROM SNELLING AVENUE m r - - - 7 r _ t r r�rr�r • 0 0 0 : 0 WM ------------- Wr�rE■EMEM ■rrar�r��r�r�r�r�r�r�r .-Ma. ■r MEEEMM MrMMr�r�r�r�r�r ME r�or ar�r�r�r�r�r�r�r�� r�inrMMd ■w'rr�ir ME rlrrri■■irrrlrrrlr�r�rrrlrrrlrrarrrlrrrll MENIM M rMrrrrrf�7��rrrlrrrlrrrlrrrlrrrlrrl ■ar_ ■ n i . . Eli! n i �r i� i G i s ■"i al r� r� Is ME Mm ma Mll ■111 us jai r ■ ■ . rlir r&l ME 0— NEW n n i irI:r� ■ a A",i ■ ■ rmm ire ME. ml EXTERIOR FINISHES 11 MP-2 • • • • • • • • • • • 0 • ® H 1305.04 Definitions. (revised 07/27/20; revised 04/10/2023; revised 04/24/2023; revised 8/28/2023) • Acre. A quantity of land containing forty-three thousand, five hundred and sixty (43,560) square feet or one hundred sixty (160) square rods in whatever shape and pattern (e.g. circular, square, triangular, irregular, broad or narrow). • Acre, net (as applied to PUD density calculations). One (1) acre of land, minus the two thirds (2/3) of that portion of the acre encompassed by wetlands, one-half (1/2) of that portion of the acre encompassing wholly or partially hills, mounds, or slopes that drop at a rate of twelve percent (12%) or more per every fifteen (15) feet or more of distance; and the entire area of public streets. • Administrative officer. The zoning administrator, building inspector, their deputies or assistants, and any other officials of the city charged with or engaged in the administration of this Code or any portion thereof. • Administrator. The zoning administrator. • Agricultural uses. Uses customarily associated with the growing of farm produce and the raising of farm animals for general use; but not including raising and feeding (feed lots) of livestock, fur farms and kennels. • Alteration. As applied to a building or structure, a change or rearrangement in the structural parts or in the existing facilities, or an enlargement, whether by extending on a side or by increasing in height, or by moving from one location to another. • Alley. A minor public or private way which is used primarily for vehicular service access to the back or side of a lot abutting on a street. • Animals, domestic. Common household pets, such as dogs and cats, other animals kept for amusement, companionship, decoration, or interest. • Animals, farm. Animals traditionally kept or raised on a farm for the purpose of providing food or products for sale or use, such as cattle, horses, goats, sheep, swine, fowl, bees, and animals raised for fur. • Animals, wild. Animals such as wolves, tigers and poisonous snakes that are not normally a domestic animal or farm animal and would ordinarily be confined in a zoo or found in the wild. • Antenna. Equipment, used for transmitting and/or receiving telecommunication, television or radio signals, which is located on the exterior, or outside, of any building or structure. • Antenna, dish. A parabolic -shaped antenna (including all supporting apparatus) which is used for transmitting or receiving telecommunication, television or radio signals, which is located on the exterior, or outside, of any building or structure. • Class I: Dish Antenna under thirty (30) inches or more in diameter; six (6) feet in surface area; or six (6) feet in height. • Class II: Dish Antenna thirty (30) inches or more in diameter; six (6) square feet or more in surface area; or six (6) feet or more in height. • Apartment. A room or suite of rooms located in a one- or two-family building or multiple dwelling, which shall include a bath and kitchen accommodation, intended or designed for use as an independent residence by a single household. • Appeal. An application for the review of an order, requirement, decision, determination or interpretation of this Code made by an administrative officer in the application and/or enforcement of this Code. • Basement. Any area of a structure, including crawl spaces, having its floor or base subgrade (below ground level) on all four sides, regardless of the depth of excavation below ground level. (revised 05/05/10) • Bluff. A topographic feature such as a hill, cliff, or embankment having the following characteristics (an area with an average slope of less than 18 percent over a distance for 50 feet or more shall not be considered part of the bluff): (added 02/22/10) Part or all of the feature is located in a shoreland area; The slope rises at least 25 feet above the ordinary high water level of the water body; • The grade of the slope from the toe of the bluff to a point 25 feet or more above the ordinary high water level averages 30 percent or greater; and The slope must drain toward the waterbody. Bluff impact zone. A bluff and land located within 20 feet from the top of a bluff. (added 02/22/10) Board. The board of appeals and adjustment established by this Code. Boarding house. A structure where sleeping rooms are provided, with a common entrance, internal access to all rooms, one (1) or more bathrooms, and one (1) or more kitchens to provide lodging for at least three (3) but not exceeding five (5) persons. A boarding house is distinguished from a transient accommodation such as a hotel or motel as defined in this chapter. (added 7/14/10) • Boulevard. That portion of a street lying between the lateral line of the roadway portion thereof (i.e., the back of the curb or curb line) and the right-of-way line thereof which may contain within its boundaries a sidewalk or portion of driveway. • Brewpub. A restaurant that also has a facility that manufactures and distributes intoxicating malt liquor or wine in total quantity not to exceed 250,000 barrels a year on the premises. (added 10/29/12) • Building. A structure which is designed and suitable for the habitation or shelter of human beings or animals, or a shelter or storage of property, or is used for trade or manufacturing. • Building line. A line parallel to a lot line or the ordinary high water level at the required setback beyond which a structure may not extend. (revised 02/22/10) • Building, accessory structure or use. A subordinate building structure or use which is located on the same lot on which the principal building or use is situated and which is reasonable necessary, appropriate and incidental to the conduct of the primary use of such principal building or principal use. Building envelope. (See Lot, Buildable portion of.) • Building height. The vertical distance from the average elevation of the grade along a face of a building to the highest point of the roof surface of flat roofs, the deck line of mansard roofs, or the average height between the eaves and the highest ridge of gable, hip, or gambrel roofs. The height of a stepped or terraced building shall be the height of the tallest segment of the building. Building inspector. The inspector as provided for in the building code. • Building, principal. A building in which the principal use, of the lot on which it is located, is conducted. • Bulk. The term used to indicate the size and setbacks of buildings or structures and location of same with respect to one another and includes the following items: Size and height of buildings or structures. • Location of exterior walls at all levels in relation to lot lines, street or to other buildings or structures. • Gross floor area of buildings or structures in relation to lot lines, street or to other buildings or structures. All open spaces allocated to buildings or structures. • Amount of lot area per dwelling unit. • Bulk materials. Uncontained solid matter such as powder, grain, stone, sand, sulfur, etc., that has a tendency to become airborne. • Business. Any occupation, employment or enterprise wherein merchandise is exhibited and sold, or which occupies time, attention, labor and materials, or whereby services are offered for compensation. • Business services. Services performed primarily for other businesses, including such services as secretarial, clerical, employment agencies, business machine service, printing, etc. • Caliper inches. The diameter of a tree measured at 4.5 feet above the ground. (added 4/28/08) • Call Center. An office for providing incoming and outgoing telephone and computer services, customer service, technical service, or telemarketing activities through electronic communications. (added 7/27/20) • Cemetery/Memorial garden. Land used or dedicated to the burial of the dead, including crematoriums, mausoleums, funeral chapels and necessary sales and maintenance facilities. (added 7/14/10) • Clear vision area. The clear vision area shall be an area within a triangle that is measured along the edge of the driving surface of the road at the intersection of two roads (public or private) and extending thirty (30) feet in each direction from the intersection with a line connecting the two end points. (revised 3/18/09) • Clear -cutting. The complete removal of trees or shrubs in a contiguous patch, strip, row, or block. (revised 02/22/10) • Clinic. A building for out -patient medical treatment of humans or small animals. • Clubs and lodges. Buildings and facilities owned and operated by a corporation or association of persons for social, recreational, charitable, educational or cultural purposes, but not operated primarily for profit or for purposes which are customarily associated with a business. • Clubs, sports and fitness. A place of assembly where membership maybe required and is directed toward the general public with the commercial promotion of sports and physical fitness. • Commission. The Planning Commission, as established by the Code of Ordinances, City of Arden Hills, Chapter 2. • Commercial recreation, indoor. A commercial recreational use conducted within an enclosed building, including arcade, arena, art gallery, assembly hall, athletic and health clubs, auditorium, bowling alley, club or lounge, community center, pool or billiard hall, or a variety of organized or franchised sports, including but not limited to basketball, ice hockey, wrestling, soccer, tennis and volleyball. This definition does not include public uses on public property. (added 7/14/10) • Commercial recreation, outdoor. An accessory commercial recreational use conducted outdoor including but not limited to horseshoes, bocce ball, or cornhole. (added 4/24/2023) • Comprehensive plan. A compilation of policy statements, goals, standard and maps for guiding the physical, social and economic development, both private and public, of the city and its environs and may include, but is not limited to, the following items: Statements of policies, goals, standards, a land use plan, a community facilities plan, a transportation plan and recommendations for plan execution. • Conditional use. A use which, because of unique characteristics, cannot be classified as a permitted use in a district, and which, after due consideration by the Planning Commission and Council, pursuant to the applicable procedures contained in this Code and the Arden Hills City Code of Ordinances, may nevertheless be permitted with restrictions on a site by conditional use permit granted by the Council. • Conditional use permit (C.U.P.). A permit required for certain land uses classified as Conditional Accessory Uses or Conditional Principal Uses. • Consumer small loan establishment. Any establishment that offers consumer small loans, commonly referred to as "payday loans," as defined in Minnesota State Statute 47.60 as amended from time to time. (added 12/3/08) • Council. The City Council, as established by the Code of Ordinances. • Crematorium. A facility containing properly installed, certified apparatus intended for use in the act of cremation. (added 7/14/10) • Critical root zone. The minimum area around a tree that should remain undisturbed. To calculate the critical root zone, measure the tree's caliper inches. For each caliper inch of tree, 1.5 feet of root radius must be protected. For example, if a tree's is 10 caliper inches, then its critical root radius is 15 feet (10 x 1.5 = 15). The critical root zone is 30 feet. (added 4/28/08) • Day care facility. Any licensed facility, public or private, which for gain or otherwise, regularly provides one or more persons with care, protection, supervision, habilitation, rehabilitation or developmental guidance on a regular basis, for periods of less than twenty-four (24) hours per day, in a place other than the person's own home, including but not limited to day care centers, day nurseries, daytime activity centers, day treatment programs, and day services. (revised 7/14/10) • Day care, family. Day care for no more than ten children at one time of which no more than six are under school age. The licensed capacity must include all children of any caregiver when the children are present in the residence. (added 7/14/10) • Day care, group family. Day care for no more than 14 children at any one time. The total number of children includes all children of any caregiver when the children are present in the residence. (added 7/14/10) Density. The number of dwelling units permitted by this Code on one (1) acre. Density net. The number of dwelling units permitted by the Code on one (1) net acre of land. • Density transfer. The relocation of housing units or square footage of building area computed on part of a building site to another part of the site resulting in an increase in density to the transfer area for the purpose of preserving open space, forested areas, environmental or terrain features deemed worthy of preservation by the Planning Commission. • Density zoning. Density zoning shall be interpreted as the provision of lot areas smaller than the minimum requirement of this Code under conditions whereby the total number of dwelling units is not greater than the amount permitted under normal conditions. • Dog kennel, Commercial. A structure specifically designed and commercially used for the harboring of three (3) or more dogs that are more than three (3) months old. • Dog kennel, Residential. A structure specifically designed and residentially used for harboring of up to three (3) dogs that are more than three (3) months old. • Dog run. A structure specifically designed for domestic use for the harboring and exercise of not more than two (2) dogs. • Drive -up Window. A window or other opening at a business establishment that allows customers to purchase and/or receive a service or product without having to enter the building. (added 12/03/08) • Dwelling. A building or portion thereof, designed or used exclusively for residential occupancy, including single-family, two-family and multiple family uses, but not including hotels, motels, nursing homes, boarding or rooming houses, tents, seasonal cabins, or motor homes or travel trailers. • Dwelling, live -work unit. A dwelling unit in combination with a shop, office, studio, or other work space within the same unit, where the resident occupant both lives and works. A live -work unit is not synonymous with a home occupation because it is designed as a mixed -use facility, whereas the home occupation is secondary and accessory to the residential use. (added 7/14/10) • Dwelling, multiple family. A dwelling containing three (3) or more attached dwelling units. Dwelling, single-family. A dwelling that consists of one (1) dwelling unit. Dwelling, two-family. A dwelling that consists of two (2) dwelling units. Dwelling unit. A residential building or portion thereof intended for occupancy by one (1) family with facilities for living, sleeping, cooking and eating but not including hotels, motels, nursing homes, tents, seasonal cabins, boarding or rooming houses, motor homes or travel trailers. • Dwelling unit, single-family attached. A dwelling unit which is located on its own individual lot but joined along a single lot line to one (1) or more other dwelling units with a party wall and having a separate point of entry. • Dwelling unit, single family detached. A dwelling which is not joined to any other dwelling unit, and is located on a separate lot with the structure surrounded by open space and having a separate point of entry. • Easement. A right or privilege in favor of a person or a government authority to use a parcel of land or portion thereof for specific purpose. • Enclosed Parking. A structure used for the storage of a vehicle which must be covered and completely enclosed by walls or doors on four sides. (added 10/4/12) • Equal Degree of Encroachment. A method of determining the location of floodway boundaries so the flood plain lands on both sides of a stream are capable of conveying a proportionate share of flood flows. • Event Center. An establishment which is rented by individuals or groups to host scheduled private events including but not limited to weddings, cultural celebrations, corporate functions, and banquets. Such use may or may not include 1) kitchen facilities for the preparation or catering of food; 2) the sale of alcoholic beverages for on -premises consumption only during scheduled events and not open to the general public; and 3) outdoor gardens, patios or outdoor gathering areas. • Exterior storage. The storage of goods, materials, equipment, manufactured products and similar items not fully enclosed by a building. • Family. An individual or two (2) or more persons, each related to the other by blood, marriage, adoption or foster care, or a group of not more than four (4) persons, some or all of whom are not related by blood, marriage or adoption, living together and maintaining a common household. (These regulations shall not be applied so as to prevent the City from making reasonable accommodation as required by the Federal Fair Housing Amendments Act of 1988). • Financial institution. An establishment that provides financial and banking services to consumers or clients. Typical uses include banks, savings and loan associations, credit unions, investment companies, and automated teller machines (ATMs). Financial institution shall not include a consumer small loan operation. (added 7/14/10) • Flood. A temporary increase in the flow or stage of a stream or in the stage of a wetland or lake that results in the inundation of normally dry areas. • Flood frequency. The frequency for which it is expected that a specific flood stage or discharge may be equaled or exceeded. • Flood fringe. That portion of the flood plain outside of the floodway. Flood fringe is synonymous with the term "floodway fringe" used in the Flood Insurance Study for the City. • Flood plain. The beds proper and the areas adjoining a wetland, lake or watercourse which have been or may be covered by the regional flood. • Flood -proofing. A combination of structural provisions, changes, or adjustments to properties and structures subject to flooding, primarily for the reduction or elimination of flood damages. • Floodway. A wetland or lake and the channel of a watercourse and those portions of the adjoining flood plain which are reasonably required to carry or store the regional flood discharge. • Floor area. Means the sum of the horizontal area of all floors of a building measured from the exterior faces of the exterior walls, or from the centerline of walls separating two buildings, Excluding: decks, garages, covered porches conforming with Section 1325.03 Subd 2.1); attics, crawl spaces and basements that do not meet the minimum ceiling height per Minnesota State Building Code requirements. • Floor area ratio (F.A.R.). The ratio obtained by dividing the sum of a building's floor area by the amount of lot area. • Frontage. The uninterrupted front boundary line of a lot, or the length of such line, which abuts on a street. • Garage, private. An accessory building or portion of the principle building which is intended and used for the storage of the private passenger vehicles of the family or families who reside upon the lot upon which the garage is located. • Garage, repair. A building or space for the repair or maintenance of motor vehicles, including body work, painting and vehicle wash, and incidental display and sales of automotive products but not including factory assembly of such vehicles, auto wrecking, or junkyards. • Garage, truck. A building that is used or intended to be used for the storage of motor trucks, truck trailers, tractors and commercial vehicles exceeding one -ton rated capacity. • Grading and Excavating. The act of excavation or filling or combination thereof to alter the contour of land for development purposes. (added 7/14/10) • Hemp Concentrate. The extracts and resins of a hemp plant or hemp plant parts, including when refined to increase the presence of targeted cannabinoids or when intended to be consumed by combustion or vaporization of the product and inhalation of smoke, aerosol, or vapor from the product. (added 8/28/2023) • Hemp -Derived Consumer Product. A product intended for human or animal consumption, does not contain cannabis flower or cannabis concentrate, and containing or consisting of hemp plant parts; or containing hemp concentrate or artificially derived cannabinoids in combination with other ingredients. (added 8/28/2023) • Hemp Plant. All parts of the plant of the genus Cannabis that has a delta-9 tetrahydrocannabinol concentration of no more than 0.3 percent on a dry weight basis. (added 8/28/2023) • Higher education, campus. The facilities for technical colleges, junior colleges, colleges and universities approved by the Minnesota Higher Education Coordinating Board for the Minnesota Department of Education. These facilities can include, but are not limited to, classrooms; laboratories; seminaries; dining and residence halls; athletic, wellness, and spiritual facilities; administrative offices; performance art centers; parking and transit structures; and child care facilities. (added 9/25/2017) • Home occupation. The accessory or conditional accessory use of a residential structure for any gainful occupation or profession. • Hospital. An institution licensed by the state department of health, providing primary health services and medical or surgical care, to sick or injured persons, primarily inpatients. May include related facilities such as laboratories, outpatient facilities, or training facilities. (added 7/14/10) • Hotel/motel. Any building, or group of buildings, having five (5) or more guest rooms intended or designed to be rented or hired out to be occupied, or which are occupied for sleeping purposes by transient guests. (revised 7/14/10) • House of worship. A place of worship or religious assembly and its accessory facilities used by the congregation such as the following: rectory, meeting hall, offices for administration of the institution, licensed child or adult daycare, playground, or cemetery. A house of worship does not include buildings or uses used exclusively for residential, schools, recreational, commercial, or other uses not normally associated with worship. (revised 7/14/10) • Household. The person or persons occupying a single dwelling unit. A household may consist of a single family, one (1) person living alone, two (2) or more families living together or any group of related or un-related persons who share living arrangements. • Industry. Uses such as the manufacturing, compounding, processing, packaging, treatment, assembling or warehousing of products and materials. • Junkyard. An open area where waste, used or second-hand materials are bought, sold, exchanged, stored, baled, packed, disassembled or handled, including but not limited to, scrap iron and other metals, paper, rags, rubber, tires and bottles. A junkyard includes a vehicle wrecking yard but does not include uses established entirely within enclosed buildings. • Landscape lot area. That portion of a lot required to remain as open space, free of buildings, parking and drives. Landscape lot areas may consist of: Naturally vegetated areas, Wetlands or ponding areas, Planting beds, ground cover and mulch areas (vegetative, rock, bark chip, etc.), Decorative walkways and areas not to exceed fifteen percent (15%) of the required landscape lot area, and Outdoor recreation areas. Landscaping. Plantings such as trees, grass, shrubs. Land Reclamation. The reclaiming of land by depositing and/or excavating material so as to alter at the minimum four hundred (400) cubic yards of the existing grade, either by hauling and/or regarding the area, shall constitute land reclamation. (added 11/27/23) • Loading area. Any area where trucks are maneuvered and parked, for the purposes of loading or unloading products, materials or equipment. • Lot. A parcel of land described by metes and bounds measurement, reference to a registered land survey, plat, record of survey map, or other means, and separated from other parcels or portions by said description, and which is occupied by, or is suitable under this Code and other applicable ordinances for occupancy by one (1) principal building, or used together with any accessory buildings or uses and such open spaces as are required by this Code. • Lot area. The total site area within the lot lines. • Lot area, net buildable. The space remaining on a lot after the minimum landscape area, open space and setback requirements of this Code have been met. • Lot area per family. The lot area per family is the lot area required by this Code to be provided for each family in a dwelling. • Lot, buildable portion of. (Building Envelope) The area of a lot on which a principal structure may be placed. The portion of a lot remaining after the minimum building setbacks have been met. (Lot area, net buildable, is more limiting as other deductions are included). • Lot, corner. A lot situated at and abutting on the intersection of two (2) or more streets having an angle of intersection of not more than one hundred thirty-five (135) degrees. A lot abutting upon a curve street shall be deemed a corner lot if the tangents to the curve at its point of beginning within the lot or at the points of intersection of the side lot lines with the street line intersect at the interior angle of less than one hundred thirty- five (135) degrees. A corner lot shall maintain front yard requirements for each street frontage. • Lot coverage. The total allowable amount of lot area, expressed as a percentage, which may be covered by a principal use and its accessory structures. • Lot depth. The mean horizontal distance between the mean front road and the mean rear lot line. The greater frontage of a corner lot is its depth, and its lesser frontage is its width. • Lot line. A property boundary line of any lot held in single or separate ownership or separately described; except that where any portion of the lot extends into the abutting street or alley, the lot line shall be deemed to be the street or alley line. • Lot line, front. The boundary of a lot abutting a street. On a corner lot, the shortest street lot line shall be the front lot line. Lot line, rear. The lot line most nearly parallel to and most remote from the front lot line. • Lot line, side. Lot lines other than front or rear lot lines. On a corner lot, the longest street lot line shall be a side lot line. Lot, interior. A lot other than a corner or reversed corner lot. • Lot, reversed corner. A corner lot, the rear of which abuts upon the side of another lot whether across an alley or not. • Lot of record. A lot existing as of April 10th, 1993, date of this Code or approved by the city as a lot subsequent to such date, and includes non -conforming lots. • Lot, shoreline. A lot having one (1) or more lot lines fronting on public waters. • Lot, through. A lot that has a pair of opposite lot lines abutting two (2) substantially parallel streets, and which is not a corner lot. On a through lot, the determination of whether the street frontage is to be considered a front yard or rear yard shall be as subject to the provisions of this Code. Lot width. The mean horizontal distance between the side lot lines at the minimum front setback line. • Lower -Potency Hemp Edible. Any product that (1) is intended to be eaten or consumed as a beverage by humans; (2) contains hemp concentrate or an artificially derived cannabinoid, in combination with food ingredients; (3) is not a drug; (4) consists of servings that contain no more than five milligrams of delta-9 tetrahydrocannabinol, 25 milligrams of cannabidiol, 25 milligrams of cannabigerol, or any combination of those cannabinoids that does not exceed the identified amounts; (5) does not contain more than a combined total of 0.5 milligrams of all other cannabinoids per serving; (6) does not contain an artificially derived cannabinoid other than delta-9 tetrahydrocannabinol; (7) does not contain a cannabinoid derived from cannabis plants or cannabis flower; and (8) is a type of product approved for sale by the Office of Cannabis Management or is substantially similar to a product approved by that Office, including but not limited to products that resemble nonalcoholic beverages, candy, and baked goods. Lower -Potency Hemp Edibles includes "edible cannabinoid products" as defined by Minn. Stat. § 151.72. Lower -potency hemp edibles do not include products containing only nonintoxicating cannabinoids. (added 8/28/2023) • Lower -Potency Hemp Edible Sales. The processing or sale of lower -potency hemp edibles or hemp -derived consumer products. (added 8/28/2023) • Lowest floor. The lowest floor of the lowest enclosed area (including basement). An unfinished or flood resistant enclosure, used solely for parking of vehicles, building access, or storage in an area other than a basement area, is not considered a building's lowest floor. (added 05/05/10) • Manufactured home. A structure, transportable in one or more sections, which is built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities, and includes the plumbing, heating, air conditioning, and electrical systems contained therein; except that the term includes any structure which meets all the requirements and with respect to which the manufacturer voluntarily files a certification and complies with the standards established under this Code and Minnesota State Statutes as amended from time to time. The term "manufactured home" does not include the term "recreational vehicle." (revised 05/05/10) • Manufacturing and processing. All uses which include the compounding, processing, packaging, treatment, or assembly of products and materials. Generally, these are industries dependent upon raw materials refined elsewhere. These uses include, but are not limited to: fabrication of wood, metal, and plastic products; assembly of electronic components, equipment, and appliances; processing of chemicals, plastics, food products, and nonalcoholic beverages; manufacturing of clothing and textile products; distribution centers, lumber yards, printing and binding shops, machine shops, sheet metal shops, sign shops, contractor's shops and storage yards. • Class I: Above uses without exterior storage. • Class II: Above uses with permitted exterior storage. • Metes and bounds. A method of property description utilizing directions and distances commencing from and terminating at an easily identifiable point. • Microbrewery. A facility that manufactures and distributes intoxicating malt liquor or wine in total quantity not to exceed 250,000 barrels a year. A microbrewery may have space dedicated as a taproom to distribute on -sale and off -sale alcohol in compliance with MN state statute 340A.301, subd. 6b. (added 10/29/12) • Microdistillery. A facility that manufactures and distributes premium, distilled spirits in total quantity not to exceed 40,000 proof gallons in a calendar year. (added 10/29/12) • Mineral extraction. The use of land for surface or subsurface removal of sand, gravel, rock, industrial minerals, and other nonmetallic minerals not regulated under Minn. Stat. Chapts. 93.44 - 93.51; or Successor Statutes. Mineral extraction does not include grading and excavating as defined in this Chapter. (added 7/14/10) • Mobile home. A manufactured home designed, constructed, and equipped for use as a single-family dwelling, which has a width of less than twenty (20) feet over more than twenty-five (25) percent of its length; or which is not placed on a permanent foundation complying with the requirements of the state building code or which is not continuous and solid for the entire perimeter of the structure. • Mobile home park. Any premises on which are parked two (2) or more occupied mobile homes, excluding premises on which mobile homes are sold for removal to another site. • Mortuary, funeral home. An establishment engaged in undertaking services such as preparing the dead for burial and arranging and managing funerals, but not including a crematorium. (added 7/14/10) • Motorized vehicle leasing and rentals. A business that leases or rents motorized vehicles to the general public. Includes minor services and washing as an accessory use. Not more than eight (8) rental or lease vehicles on site at one time. • Motorized vehicle service. A business that provides repair or maintenance services for motorized vehicles including engine repair, replacement or parts and engine service, but does not include body work, painting, factory assembly of vehicles or vehicle wrecking yards. • Multiple occupancy building. A building containing two or more independent businesses with or without separate exterior entrances and for which signage, parking and site requirements are unified in a consistent visual and functional manner. • Native vegetation. "Native Vegetation" - Plant species indigenous to Minnesota, or that expand their range into Minnesota without being intentionally or unintentionally introduced by human activity, and are classified as native in the Minnesota Plant Database (Minnesota DNR, 2002 or as amended). Native Vegetation does not include Weeds. (revised 02/22/10) • Nonconforming building. A building lawfully existing as of the effective date of the adoption of this Code, or amendment hereto, which under the provisions of this Code could not be built because of restrictions on height, setbacks, yards, lot coverage, floor area ratio, or other characteristics of the building or its location on the lot where it exists. • Nonconforming use. A building, structure or use of a building, structure or parcel of land, or a portion thereof, lawfully existing as of the effective date of the adoption of this Code or amendment hereto, as a matter of right or by permit, which is not permitted in the zoning district in which it is located. • Nonintoxicating Cannabinoid. A cannabinoid that when introduced into the human body does not impair the central nervous system and does not impair the human audio, visual, or mental processes. Nonintoxicating cannabinoid includes but is not limited to cannabidiol (CBD) and cannabigerol (CBG) but does not include any artificially derived cannabinoid and must contain less than 0.3% tetrahydrocannabinol (THC). (added 8/28/2023) • Nursery. Any land used to raise trees, shrubs, flowers, and other live plants for sale and commerce. • Nursing Home and Assisted Living Facility. A facility that provides daily assistance and long-term residence for disabled or elderly individuals. This includes a combination of housing, supportive services, personalized assistance and health care designed to respond to the individual needs of those who need help with activities of daily living, such as dressing, grooming, bathing, etc. (added 7/14/10) • Obstruction. Any dam, wall, wharf, embankment, levee, dike, pile, abutment, projection, excavation, channel, modification, culvert, building, wire, fence, stockpile, refuse, fill, structure, or matter in, along, across, or projecting into any channel, watercourse, or regulatory flood plain which may impede, retard, or change the direction of the flow of water, either in itself or by catching or collecting debris carried by such water. • Office(s). A room, suite of rooms, or a building containing rooms or suites of rooms in which persons conduct commercial activities, provide professional services, or carry on occupations and where goods are not stored, produced, sold at retail or repaired, including but not limited to the following: executive and administrative offices, business offices such as insurance, real estate, sales and similar offices, professional offices such as offices of engineers, surveyors, architects, accountants, attorneys and bookkeepers and similar offices, but excluding medical clinics. (revised 7/14/10) • Office showroom/warehouse. An office facility in which more than 50 percent of the total floor area is utilized for the display and sale of goods or merchandise on the premises, and/or for the storage and distribution of goods or merchandise from the premises. (added 7/14/10) • Off-street parking areas. Structures or areas of ground used for the storage or parking of motor vehicles. • Open sales lot. Any land used or occupied for the purpose of buying and selling any goods, materials, or merchandise, and for the storing of same under the open sky prior to sale. • Open space. (See landscape lot area.) • Ordinary high water level. The boundary of public waters and wetlands, and shall be an elevation delineating the highest water level which has been maintained for a sufficient period of time to leave evidence upon the landscape and as determined by the Minnesota Department of Natural Resources. The ordinary high water mark is commonly that point where the natural vegetation changes from predominantly aquatic to predominantly terrestrial. (revised 02/22/10) • Outdoor display and sales. The display of goods for sale or rent outside an enclosed building. (added 3/28/16) • Park facilities. The use of any lots or parcel of land and any structure or building thereon for public active and passive recreation purposes by the Arden Hills Parks and Recreation Department or the Ramsey County Parks and Recreation Department. (added 11/25/13) • Parking space. A land area of such shape and dimensions and so prepared as to be usable for the parking of a motor vehicle, and so located as to be readily accessible to a public street or alley. Truck loading and unloading space shall not be included in such area. • Pathway, pedestrian way. A public or private way, running across or located within a platted lot or block or an unplatted parcel of land, used primarily for pedestrian traffic. • Pawn shop. The location at which or premises in which a pawnbroker regularly conducts business. (added 7/14/10) • Pawnbroker. (a) Except as provided in paragraph (b), "pawnbroker" means a person engaged in whole or in part in the business of lending money on the security of pledged goods left in pawn, or in the business of purchasing tangible personal property to be left in pawn on the condition that it may be redeemed or repurchased by the seller for a fixed price within a fixed period of time. • (b) The following are exempt from the definition of "pawnbroker": any bank regulated by the state of Minnesota, the comptroller of the currency of the United States, the Federal Deposit Insurance Corporation, the board of governors of the Federal Reserve System, or any other federal or state authority and their affiliates; any bank or savings association whose deposits or accounts are eligible for insurance by the Federal Deposit Insurance Corporation or any successor to it and all affiliates of those banks and savings associations; any state or federally chartered credit union; and any industrial loan and thrift company or regulated lender subject to licensing and regulation by the Department of Commerce. (revised 7/14/10) • Person. Any individuals, firm, partnership, corporation, company, association, joint stock association or body politic; includes any trustee, receiver, assignee or other similar representative thereof. • Personal services. Services customarily rendered for compensation. Such services shall only involve minor storage and related sales of products and supplies related to the service offered and for customers ordinarily utilizing the service offered. Typical personal services include but are not limited to: apparel tailoring and cleaning; hair styling, trimming and cutting; beauty services; photographic services; and other services of a similar nature. • Planned unit development (P.U.D.). The development of a tract of land in a unified manner, pursuant to a development plan specifically approved by the city. • Planning commission. The planning agency of Arden Hills as prescribed in Minnesota Statutes Chapter 462.354. It is advisory to the City Council on all matters related to the Comprehensive Plan and all official controls that implement the Comprehensive Plan, and all other matters referred to it by the City Council. • Protected waters. Any waters of the State as defined by State law. However, no lake, pond or flowage of less than ten (10) acres in size and no river or stream having a total drainage area less than two (2) square miles shall be regulated for the purposes of these regulations. • Public use. The use of any lot, parcel of land and any structure or building thereon exclusively for public purposes by any department or branch of government, federal, state, county or city, excluding independent school districts, without reference to the ownership of said lot, parcel of land, building or structure. • Public waters. Means a body of water capable of substantial beneficial public use. This shall be construed to mean, for the purposes of these regulations, any body of water, which has the potential to support any type of recreational pursuit or water supply purpose. A body of water created by a private user where there was no previous shoreland, as defined herein, for a designated private use authorized by the commissioner of natural resources, shall be exempt. • Railroad right-of-way. A strip of land with tracks and auxiliary facilities for track operation, but not including depots, loading platforms, station, train sheds, warehouses, car shops, car yards, locomotive shops or water towers. • Reach. A hydraulic engineering term to describe a longitudinal segment of a stream or river influenced by a natural or man-made obstruction. In an urban area, the segment of a stream or river between two consecutive bridge crossings would most typically constitute a reach. • Recreation, commercial. Recreational facilities which are operated for profit or render a service which is customarily considered as a business. • Recreation, residential. Play apparatus such as swing sets and slides, sandboxes, poles for nets, picnic tables, lawn chairs, barbecue stands, and similar equipment or structures, when used on residential property, but not including electronic towers, tree houses, swimming pools, playhouses exceeding twenty-five (25) square feet of floor area, or sheds utilized for storage of equipment. • Recreational vehicles (RVs). Vehicles for recreational or utilitarian uses that can be driven, towed, or hauled. Including, but not limited to, motor homes and travel trailers, snowmobiles, pull campers, all terrain vehicles (ATVs), tent trailers, or other similar vehicles. (revised 02/07/08) • Recreational vehicles (for the purposes of Section 1335 only). A vehicle that is built on a single chassis, is 400 square feet or less when measured at the largest horizontal projection, is designed to be self-propelled or permanently towable by a light duty truck, and is designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. For the purposes of Section 1335, the term recreational vehicle shall be synonymous with the term travel trailer/travel vehicle. (added 05/05/10) • Recreational Vehicles, Utility Trailers, Riding Lawn Mowers, and Watercraft Height. The distance as measured from the ground to the highest point of the recreational vehicle, utility trailer, or watercraft, including any covering, as stored. This does not including antennas and utility/mechanical systems provided they are accessory and take up no more than ten (10) percent of the roof surface area. RVs and watercraft on a trailer shall be measured as one. (revised 02/07/08) • Recreational Vehicles, Utility Trailers, Riding Lawn Mowers, and Watercraft Length. The distance as measured from end to end of the recreational vehicle, utility trailer, or watercraft, including any hitch, motor, and covering, as stored. RVs and watercraft on a trailer shall be measured as one. (revised 02/07/08) • Regional flood. A flood which is representative of large floods known to have occurred generally in Minnesota and reasonably characteristic of what can be expected to occur on an average frequency in the magnitude of the 100-year recurrence interval. Regional flood is synonymous with the term "base flood", 1 percent annual chance flood, or 100-year elevation. • Regulatory flood protection elevation. The regulatory flood protection elevation shall be an elevation no lower than one foot above the elevation of the regional flood plus any increases in flood elevation caused by encroachments on the flood plain that result from designation of a floodway. (added 05/05/10) • Research animals. Animals kept in a laboratory setting for the purpose of testing and research related health care products. • Research and development facility. Establishments which conduct research, development, or controlled production of high technology electronic, industrial, or scientific products or commodities for sale; or establishments conducting educational or medical research or testing. May include limited accommodations for researchers or research subjects. Research with animals is considered a separate category. (added 7/14/10) • Residence hall, dormitory. A building designed for or used as group living quarters for students of a high school, college, university or seminary, organized and owned, or leased in its entirety, by a high school, college, university or seminary. (added 7/14/10) • Residential facility. Any licensed facility, public or private, which for gain or otherwise, regularly provides one or more persons with a twenty-four (24) hours per day substitute for care, food, lodging, training, education, supervision, habilitation, rehabilitation and treatment they need, but which for any reason cannot be furnished in the person's own home, including but not limited to, state institutions under the control of the commissioner of public welfare, foster homes, residential treatment centers, maternity shelters, group homes, residential programs, or schools for handicapped children. • Restaurant. A business establishment whose principal business is the preparation, service and sale of food and beverages to be consumed by customers while seated at tables or counters located within the building on the premises. • Restaurant, fast food. Any restaurant which meets a number of the following requirements: Customarily provides quick service to its customers; Offers to its customers a limited, standardized menu of inexpensive food and/or beverages; • Serves its customers from a counter located within the building on the premises and does not customarily offer service at the table by waiter or waitress; • Allows customers to consume their orders of food and/or beverages at tables or counters within the building, in their automobiles parked on the premises, or away from the premises as the customers choose; • Packages and services a substantial proportion of its food and/or beverages in disposable wrappers, containers, cartons, boxes and bags; • Provides a number of trash, litter, or garbage cans in the parking areas and within the building on the premises for the deposit of the disposable packaging in which the food and/or beverages are provided; • Prepares and cooks a substantial proportion of its food in volume, in advance of orders by customers, and usually in anticipation of predicted volumes of customers at certain times of the day; • Specifies the items of food and/or beverage offered to customers on signs, placards, posters, valances, or boards posted in conspicuous places throughout the building rather than on printed menus given to the customers; • Generates a high volume and rapid flow of in -and -out traffic because of its quick service mode of operation. • Retail sales and service. An establishment engaged principally in the sale or rental of primarily new goods and the provision of services directly to the consumer, excluding those uses defined more specifically in this Code. Motor vehicle sales, motor vehicle leasing and rentals, exterior equipment rental and sales lots, repair garages, pawn shops, thrift stores, and open sales lots are not included in this definition of retail sales and service. (revised 2/29/16) • Roadway. The entirety of a private street and that portion of a public street extending from the back of the curb (i.e., the curbline) on one side to the back of the curb (i.e., the curbline) on the other side, used primarily for vehicular traffic. • Schools, bus terminal. School bus terminal shall be a building or space engaged primarily in the transportation and activities associated with the transportation of students. Schools, general education. Nursery, primary, elementary and secondary schools. Schools, specialized education. Trade, vocational, business, barber, beauty, art, music, dancing, driving and other professional schools, with or without on -site housing. (revised 01/20/11) • Service station. A place where gasoline, kerosene, diesel or other motor fuel or lubricating oil or grease for operating motor vehicles are offered for sale to the public and deliveries are made directly into motor vehicles. Includes greasing and oiling, one -bay motor vehicle wash and the sale of automobile accessories on the premises. Also includes minor repairs, incidental body and fender work, minor painting and upholstering, replacement of parts and motor services to passenger automobiles and trucks not exceeding one and one-half (1.5) tons capacity. It shall not include major general repair, rebuilding or reconditioning of engines, motor vehicles or trailers; collision service, including body, frame or fender straightening or repair; overall painting or paint job. • Setback. The minimum horizontal distance between a structure and the ordinary high water level or between a structure and a road, well, highway, or property lines. • Setback, minimum building. The minimum horizontal distance allowed by this Code, between a structure and a lot line. • Shore impact zone. The land located between the ordinary high water level and a line parallel to it at a setback of 50 percent of the structure setback. (revised 02/22/10) Shoreland. The land located within the following distances from protected waters: One thousand (1,000) feet from the ordinary high water mark of a lake, pond, or flowage; and • Three hundred (300) feet from a river or stream, or the landward extent of a flood plain on such rivers or streams, whichever is greater. • The practical limits of shorelands may be less than the statutory limits where the limits are designated by natural drainage divides at lesser distances, as shown on the official zoning map of the City. • Sidewalk. A hard surfaced public or private way, used primarily for pedestrian traffic. • Sign. A name, identification, description, display, logo, illustration or device which is affixed to, painted or represented directly or indirectly upon a building or other surface or piece of land, and which directs attention to an object, product, place, activity, person, institution, organization or business. • Significant tree. A tree that is important to the site and the neighborhood character, that is structurally sound and healthy, and that meets at least one of the following standards: (revised 04/28/08) • A deciduous hardwood tree that is at least ten (10) caliper inches, including but not limited to, ironwood, catalpa, oak, hard maple, walnut, hickory, birch, black cherry, hackberry, locust and basswood. • A deciduous softwood tree that is at least twelve (12) caliper inches, including but not limited to, cottonwood, poplars/aspen, box elder, willow, silver maple and elm. • A coniferous evergreen tree having foliage on the outermost portion of the branches year-round and which is at least fifteen (15) feet or more in height. • A group of deciduous trees that are at least eight (8) caliper inches or coniferous trees that are at least fifteen (15) feet in height, that provide a buffer or screening along an adjacent public street or between differing land uses. • Soil processing. The processing of sand, gravel or other materials mined from the land. • Solar Energy System. A system or set of devices whose primary purpose is to collect, convert, store and distribute solar energy, including for heating and cooling of buildings, electricity generation, water heating and other energy -using processes. (added 4/10/2023) • Staging Area. Any exterior area that is used to load, unload, stack, pile, store or assemble materials, equipment or vehicles to be used either on site or off site. • Story. That portion of a building included between the surface of any floor and the surface of the floor next above it, or, if no such floor above, the space between such floor and the ceiling next above it. • Story, half. A space under a sloping roof which has the line of intersection of roof decking and wall face not more than three (3) feet above the top floor level, and in which space not more than two-thirds (2/3) of the floor area is finished for use. A half -story containing independent apartment or living quarters shall be counted as a full story. • Streets. A public or private way, consisting in the case of a private way of a roadway and in the case of a public way of a roadway and a boulevard (the latter of which may contain a sidewalk), used primarily for vehicular traffic, whether designated as a street, avenue, parkway, road, lane, throughway, expressway, highway, place or however otherwise designated. The term "streets" includes the following classifications: • Collector street. A street which carries traffic from local streets to streets and highways of higher classifications. It provides for both land access service and local traffic movements within residential neighborhoods, commercial areas and industrial areas. • Cul-de-sac. A street with a circular turn -a -round and only one outlet. • Local street. A street of limited continuity used primarily for access to the abutting properties and the local needs of a neighborhood. • Minor arterial. A street system that interconnects with and augment the urban major arterial system and provide service to trips of moderate length at somewhat lower level of travel mobility than major arterials. This system distributes travel to geographical areas smaller than those identified with the higher system. • Major arterial. Usually a divided highway with four (4) or more lanes and serves the major centers of activity of a metropolitan area, the highest traffic volume corridors, and the longest trip desire. The major arterial carries a high proportion of the total urban area travel on a minimum mileage. Almost all fully and partially controlled access facilities are a part of this class. • Expressway. A type of major arterial with a controlled access roadway and expressway ramps to provide ingress or egress to other levels of streets. The use of expressway ramps allows the uniform flow of traffic on a major arterial highway without undue delays. • Structural alterations. Any change in the supporting members of a building such as bearing walls, columns, beams or girders, or any substantial changes in the roof and exterior walls. • Structure. Anything constructed, the use of which requires a permanent location on the ground or attachment to something having a permanent location on the ground, including, but not limited to, buildings, factories, sheds, detached garages, cabins, manufactured homes, signs, recreational vehicles not meeting the exemption criteria otherwise specified in the zoning code, and other similar items. • Structure, accessory. A detached, subordinate structure, the use of which is incidental and related to that of the principal use of or principal structure on the lot on which it is located. • Structure, multiple -occupancy. (See Multiple occupancy building). • Structure, principal. The predominant structure upon a lot in which the principal use of the lot is conducted. • Structure, temporary or portable. A structure which is not intended for permanent occupancy but which may be suitable in certain situations for specific periods of occupancy pending either construction of permanent facilities or a change in conditions that will eliminate the need for the temporary structure. Portable classrooms, portable offices, and air -supported structures are examples of temporary or portable structures. Studios. A building or space within a building where professional artists, musicians, photographers, dancers, designers, etc. practice their profession or teach; display and sales of products used or produced in the profession is considered an accessory use. • Substantial damage. Damage of any origin sustained by a structure where the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. (added 05/05/10) • Substantial improvement. (added 05/05/10) Within any consecutive 365-day period, any reconstruction, rehabilitation (including normal maintenance and repair), repair after damage, addition, or other improvement of a structure, the cost of which equals or exceeds 50 percent of the market value of the structure before the "start of construction" of the improvement. This term includes structures that have incurred "substantial damage," regardless of the actual repair work performed. The term does not, however, include either: • Any project for improvement of a structure to correct existing violations of state or local health, sanitary, or safety code specifications which have been identified by the local code enforcement official and which are the minimum necessary to assure safe living conditions. • Any alteration of an "historic structure," provided that the alteration will not preclude the structure's continued designation as an "historic structure." For the purpose of this Ordinance, "historic structure" shall be as defined in 44 Code of Federal Regulations, Part 59.1. • Thrift Store. A business for which the stock of goods is primarily used and may include the following operational characteristics: Receipt of used items directly from the public at the business location. Processing, conditioning, cleaning, or repair of used or returned items for resale. Storage of used items on site for processing, resale, or disposal. Receipt of goods through purchase, consignment, or donation. (added 2/29/16) • Tower. Any pole, spire or structure, or any combination thereof, to which an antenna is attached, or which is designed for an antenna to be attached, and all supporting lines, cables, wires and braces; including but not limited to a free-standing radio (including ham radio and private radio transmitting) or television receiving antenna, a windmill, and a wind -power generator. • Townhouse. A single-family dwelling, which maintains private ingress and egress, contains no independent dwellings above or below it, and is attached to other similar dwellings by a common wall. • Use. The purpose for which land or premises or a building thereon is designated, arranged or intended, or for which it is or may be occupied or maintained. • Use, accessory. A use which is incidental to the principal use of the lot on which it is maintained or conducted. • Use, principal. The primary or predominant use for which the lot and structure, if any located thereon, is conducted or maintained. • Use, principal multiple -operation. A business or industrial operation which consists of two or more distinguishable uses, all of which are dependent upon each other, but none of which is predominately or clearly the principal use and all of which are generally compatible with the permitted allowable uses in the district. • Use, conditional accessory. A use which is both an accessory use and a conditional use and which, after due consideration by the Commission and Council, pursuant to the applicable procedures contained herein, may be allowed as an accessory use by Conditional Use Permit granted by the Council. • Use, conditional principal. A principle use which, because of unique characteristics, cannot be classified as a permitted principle use in any particular district, and which, after due consideration by the commission and council, pursuant to the applicable procedures contained herein, may nevertheless be allowed on a site in a particular zoning district by Conditional Use Permit be granted by the council. Includes temporary uses which require conditional approval before being allowed. • Utility distribution lines. The distribution facilities of electric power, gas, water and communication companies which directly serve abutting properties. • Utility substation. A structure used for the relay or distribution of electric, water, sewer, telephone, etc., services. • Utility transmission lines. The transmission facilities of electric power and communication companies which do not directly serve abutting properties. • Utility trailer. Equipment used for recreational or utilitarian purposes that can be towed; such as special purpose trailers (i.e. boat trailers, ATV trailers) or other hauling trailers. (revised 02/07/08) • Utility vehicle. A vehicle, with or without a motor, and/or adapted for temporary living, sleeping, business or storage purposes; having a frame, but no foundation other than wheels, blocks, studs, jacks, horses or skirting, which does not reach or meet building code requirements and has been or may be equipped with wheels or other devices for transporting purposes. This term shall include travel trailers, camping trailers, tent trailers, recreation vehicles, farm tractors, riding yard and garden tractors and trailers. A permanent foundation shall not change the character of the vehicle. • Variance. A modification or variation of a specific permitted development standard required as a provision of this Code, to allow an alternative development standard not stated as acceptable in the official control, but only as applied to a particular property for the purpose of alleviating a hardship, practical difficulty or unique circumstance, except that modification in the allowable uses within a district shall not be allowed as a variance. (revised 05/05/10) • Vehicle wash. A building, or portion thereof, which principal use is the washing of vehicles. • Vehicle wrecking yard. Any open space where three (3) or more used motorized vehicles are stored which do not possess current state auto licenses. • Warehousing. The storage and distribution of materials or equipment within an enclosed building, but not including personal storage facility. (revised 7/14/10) • Watercraft. Motorized water -oriented vehicles including, but not limited to, power boats, cruisers, jet skies, fishing/hunting boats, pontoon boats, and any non -motorized craft with greater than a two person capacity. This definition excludes non -motorized one and two person crafts such as canoes, kayaks, and paddle boats. (revised 02/07/08) • Waterfront uses. Boat docks and storage, water recreation equipment and other uses normally associated with to lakeshore property. • Wetlands. Transitional low-lying areas between terrestrial and aquatic systems, either created or natural, covered with shallow and sometimes temporary or intermittent waters as defined in the United States Fish and Wildlife Service Circulator No. 39. This includes, but is not limited to swamps, marshes, bogs, sloughs, wet meadows, and shallow lakes and ponds with emergent vegetation. (revised 02/22/10) • Wetland alteration. Alteration of a wetland includes changes to the wetland and/or wetland buffer strip in regards to size, depth or contour; dredging; tilling; damming; alteration of the watercourse; ditching; tiling; grading; draining; discharge of water; appropriation of water; changes in vegetation; or otherwise altering or destroying a wetland or wetland buffer or their functions. Alterations would not include Native Vegetation plantings or selective clearing or pruning of prohibited or restricted noxious weeds, unless within a Drainage and Utility Easement in which case submission of and written approval by the City is required. (added 02/22/10) • Wetland buffer strip. An area of vegetated ground cover around the perimeter of a wetland that, either in its natural condition or through intervention, has the characteristics of buffering the wetland from surrounding landscaping. (added 02/22/10) • Wetland delineation. An assessment tool utilized to determine the boundary of a wetland using the US Army Corps of Engineers Wetland Delineation Manual (January 1987) as well as any additional boundary determination requirements established in Minnesota Rules Chapter 8420. A "Wetland Delineation Report" is a document that summarizes the observations, results and conclusions performed during the assessment when wetlands are present. (added 02/22/10) • Yard, front. A yard extending along the full length of the front lot line between the side lot lines. • Yard, minimum required. The minimum open space extending between a minimum building setback line and the adjoining lot line in which a principle building may not be placed and in which accessory buildings may only be placed as regulated in this Code. • Yard, rear. A yard extending across the full width of the lot and measured between the rear line of the lot and the rear line of the main building. • Yard, side. A yard between the building and the adjacent sideline of the lot and extending from the front yard to the rear yard. • Yard area, required rear. The minimum required rear yard depth multiplied by the average width of the total rear yard. • Zoning map. The map or maps incorporated into this Code as a part hereof, delineating the zoning districts. 1320.05 Land Use Chart.(revised XX/XX/)OC) Zoning Districts: B- 2 B- 3 B- 4 CC GB 1-1 1-2 i-FLEX CD POS INST Antenna, Dish or Tower CA CA I CA CA CA I CA CA CA CA CA CA CA CA CA CA CA CA Boarding house C C C I C =_ __ __ __ _= C Brewpub =_ __ __ __ __ _= C C C Business service _= A P P I P C I P P P P Clinic, medical office =_ __ __ P P P P P C P P P P Club or lodge (non-profit) P P P == C Club, sports & fitness =_ __ __ _= A P P P C P P == P Commercial recreation - indoor =_ __ __ __ __ _= P P P =_ _= P Commercial recreation - outdoor =_ __ __ __ __ _= A Day care facility, over 10 =_ __ __ _= P P P P P == P P P P Day care, family - 10 or less A A A A A == A Day care, group family - 14 or less CA CA CA CA CA == CA Dog kennel =_ __ __ __ __ _= C C Dog run A A A Drive -up windows =_ __ __ __ __ _= C C C == A "Dry cleaning & laundry, pick-up station" __ __ __ _= C == A A =_ _= I A "Dry cleaning & laundry, self-service laundry" __ __ __ C == C C Dwelling: density zoning D D D D =_ __ == __ __ __ __ Dwelling: multiple family =_ _= C C C == C =_ _= C C Dwelling: single-family attached C C D D Dwelling: single-family detached P P P P Dwelling: two-family C C P P C Dwelling: live -work unit =_ __ __ _= C Event Center =_ __ __ __ __ _= C Financial institution & service =_ __ __ _= P P P P P C P P P P Garage, truck =_ __ __ __ __ __ __ __ __ __ _= C C Higher Education, Campus =_ __ __ __ __ __ __ __ __ __ __ __ __ __ __ _= C Home occupation: Class I A A A A A =_ __ __ _= A Home occupation: Class II CA CA CA CA CA =_ __ __ _= C Hospital Hotel/motel =_ __ __ __ __ _= C P C C C =_ _= C House ofworship C C C C C C C C C C == __ _= C Lower -Potency Hemp Edible Sales =_ __ __ _= CA == CA CA CA == CA Manufactured home park =_ _= C Manufacturing & processing : Class I __ __ __ _= A A A == P I P P P Manufacturing & processing : Class 11 =_ __ __ __ __ __ __ __ __ __ _= P Micro brewery =_ __ __ __ __ _= C C C == C == C 1 of 2 1320.05 Land Use Chart.(revised XXXXXM) Micro distillery I I I C I C C C I C Zoning Districts: Uses: R- 1 R- 2 R- 3 R- 4 NB B- 1 B- 2 B- 3 B- 4 CC GB 1-1 1-2 I-FLIX CD POS INST Mortuary, funeral home =_ __ __ __ __ _= P P == C Multiple occupancy building =_ __ __ _= C C C C C C C C C C Nursery C C C C Nursing home and assisted living C C C C =_ _= D =_ _= C Office =_ __ __ _= P P P P P P P P P P Pawn shoe =_ __ __ __ __ __ __ __ __ __ __ __ __ __ _= P =_ Personal services =_ __ __ _= C A P P P C P =_ _= A Public use C C C C C C C C C C C C C C Research and development facility __ __ _= C P C C C P P P P C C Research animals =_ __ __ __ __ _= C =_ __ __ C C Residence Hall, dormitory C == C D Residential facility, state licensed, serving 1- 6 P P P P P == P Residential facility, state licensed, serving 7- 16 C C C C C == C Restaurant and restaurant -fast food =_ __ __ _= C A P P P C P c C Retail sales & service =_ __ _= P A P P P C A A A A School, general education C C C C =_ __ __ __ _= C School, specialized education C C C C C Service station =_ __ __ __ __ _= C C =_ _= C C C Solar Energy System A A A =_ __ __ __ __ __ __ __ __ __ _= C Storage, exterior =_ __ __ __ __ __ __ __ __ __ __ _= CA Studio =_ __ __ _= C C P P P C Theater, indoor =_ __ __ A C P == C Thrift Store =_ __ __ __ __ __ __ _= C =_ __ __ _= C Utility distribution line P P P P P P P P P == P P P P A P =_ Utility substation =_ __ __ __ __ __ __ __ __ __ _= C C Utility transmission C C C C C C C C C == C C C C C C =_ Vehicle - motorized, leasing and rentals __ __ C C Vehicle - motorized, service =_ __ __ __ __ _= C C A A A A == C P P C "A" = Accessory "CA" = Conditional Accessory Use Permit "C" = Conditional Use Permit "D" = Planned Unit "I" = Interim Use Permit T" = Permitted _=' = Not Permitted 2 of 2 1320.085 Special Requirements for the B-2 General Business District. The B-2 General Business District encompasses a primary gateway into the City. The aesthetic and transportation impacts from new developments and redevelopments must be evaluated to help ensure the long-term viability and success of the B-2 District. Accomplishing the purpose of the B 2 District requires particular concern for the design of buildings, site features (such as landscaping, lighting, and signage), site layout, building materials, site design, and other related design elements. To that end, new development and redevelopment shall conform to the standards in this and related zoning requirements. The "Guiding Plan for the B2 District" shall act as a guide for development but is not part of the Zoning Code. In reviewing and approving land use applications, the City Council shall make the final determination on the compatibility and consistency with all provisions in this and related sections of the Zoning Ordinance. (revised 12/3/08) Subd. 1 Procedure. To further accomplish the stated purpose of the B2 District, the following procedures shall be used: A. Proposals for new construction, redevelopment of a site, and significant modifications to existing sites shall use the Planned Unit Development (PUD) process. The PUD proposal shall identify any requested modifications from the applicable zoning requirements and from the "Guiding Plan for the B2 District" as well as the reasons why the modifications would be in the public interest and would be consistent with the purpose of the B-2 District. Modifications to these requirements may be granted by the City without a variance through the PUD process. Conditional use permits may also be required for uses list in Section 1320.05. B. Conditional Use Permits, Site Plans, and other development agreements that were approved for development sites before November 24, 2008, shall remain in effect but shall use the Planned Unit Development Process for future site amendments. C. The following items shall not be considered significant modifications to an existing site and shall be exempt from the PUD process but shall be subject to administrative review and approval: 1. Internal alterations to buildings that do not result in a change to the building height, roof line, or footprint unless the changes will have a notable increase in traffic and/or parking needs as determined by the Community Development Director or their designee; 2. Replacement, maintenance, or repair of existing materials, including exterior finishes, signage, landscaping, and parking lots; 3. Minor modifications to the exterior of a building or a site that substantially conforms to the design standards in Section 1325 and has no discernable impact on traffic as determined by the Community Development Director or their designee; D. The provisions in this Section may be modified by the City Council to allow planning flexibility without the need for a variance to encourage cooperative dialogue between the applicant and the City. Minor improvements to existing uses should be encouraged without costly upgrades or complete changes to a site. Subd.2 Uses. A. Permitted uses (as specified in the Land Use Chart, Section 1320.05, for the B-2 District) that occupy existing buildings do not require a conditional use permit prior to occupancy. Other city permits may be required. B. Conditional uses (as specified in the Land Use Chart, Section 1320.05, for the B-2 District) require an approved conditional use permit prior to occupancy. Other city permits may be required. C. The following land uses are not compatible with the stated purpose of the B-2 District and shall be prohibited: 1. Individual retail businesses larger than 50,000 square feet except for Sports and Fitness Clubs. 2. Open sales, rental or storage lots, including but not limited to cars, buses, trucks, motorcycles, bicycles, recreational vehicles, trailers, boats, mobile homes, machinery, lumber, building materials, and similar items. Approved open air garden centers shall be exempt. 3. Mini storage facilities; 4. Tattoo parlors; S. Consumer Small Loan establishments; 6. Outdoor bulk storage buildings, including but not limited to, forest, metal, concrete, agricultural and petroleum products, chemicals and similar products; and, 7. Manufacturing or processing that generates hazardous waste without a valid Hazardous Waste Generator's license from the Ramsey County Public Health Department. Subd. 3 Special Regulations for Drive -up Windows. Section 1325.04 of the Zoning Ordinance specifies additional requirements for drive -up windows and automobile service stations. In accordance with Section 1320.085, Subd. 1, the City Council as part of the land use application review shall require the following conditions to be met in determining site suitability for drive -up windows: (revised 6/27/2022) A. The architectural treatment, circulation plan, and signage system of such businesses shall be designed to visually and functionally integrate the building and the site on which it is located. B. The applicant shall submit a circulation plan that demonstrates that the use will not interfere or reduce the safety of non -motorized movements, specifically pedestrian and bicyclists. C. Requested modifications to the provisions in section 1325.04 shall be stated in writing along with an explanation of why the modifications would be in the public interest and would be consistent with the purpose of the B-2 District. Subd. 4 Hotel/Motel Additional Conditional Use Permit Criteria. In addition to meeting the requirements of Section 1345 and 1355.04 Subd 3, hotel/motels shall conform to the following: A. Meet building code requirements; B. Entrance to each room shall be from an indoor corridor; C. Landscaping shall be brought into conformance with section 132S.05 Subd 1. Subd. 5 Assisted Living Additional Planned Unit Development Criteria. (revised 1/25/2021) A. In addition to meeting the requirements of Section 1325, multi -family assisted living residential projects may incorporate memory care units meeting the following: 1. Each unit consists of private bedrooms with bathrooms; 2. Each unit is open to a shared central dining and living areas; 3. Units maybe less than 550 square feet; 4. Memory care units shall be considered to be equivalent to .5 dwelling units. B. In addition to meeting the requirements of Section 1325, an existing hotel -motel use may be used for assisted living upon approval of a Master Planned Unit Development provided that all of the following requirements are met: 1. The building to be used for assisted living meets applicable building and fire codes as determined by the Fire Marshal and Building Official; 2. Each room that has occupants on an overnight basis shall have bathroom facilities within the room; 3. The capacity of the building shall not be exceeded Subd. 6 Event Center Additional Conditional Use Permit Criteria. A. In addition to meeting the requirements of Section 1325 and 1355.04 Subd 4, event centers shall conform to the following: 1. The occupancy of the building must never exceed the occupancy load posted based on the Fire Marshal's determination. 2. The serving of alcohol shall be subject to Minnesota State Statute and Chapter 5 - Alcoholic Beverages of the Arden Hills City Code requirements and is permitted only in conjunction with a private event that is not open to the public. 3. Licensing information from the Ramsey County Sheriffs Office maybe requested by City. City could at its discretion request licensing information from the County Sheriff s Office. 4. A security plan shall be submitted and approved by the City; S. A noise mitigation strategy shall be submitted and approved by the City. B. In addition to meeting the requirements of Section 1325 and 1355.04 Subd 4, the City may: 1. Prohibit access from a predominantly residential street; 2. Restrict the hours of operation for loading docks; 3. Require greater than minimum setbacks for structures and driveways; 4. Require opaque screening to eliminate headlight glare; 5. Impose any other restriction it deems to be in the public interest. 1325.06 Requirements for Parking, Loading and Circulation. (revised 4/28/08) (revised 7/27/20) Subd. 1 Off -Public Street Parking. A. Area and Dimensions of Each Parking Space. For the purpose of this Code, a parking space shall be not less than three hundred (300) square feet per vehicle of standing and maneuvering area. Individual spaces shall be at least nine (9) feet in width and eighteen (18) feet in length. B. Access. All off-street parking spaces shall have access driveways and access directly to public streets or alleys. Curb cuts for uses other than single family homes shall require approval from the Council. The number of curb cuts along arterial and collector roads shall be held to a minimum whenever possible. Any residential lot, which has frontage on both a local street and a collector street or a major or minor arterial (as defined by the Comprehensive Plan of Arden Hills) shall gain access only from the local street. C. Construction Standards. These standards shall apply to all development: 1. Surfacing. Off-street parking areas and drives shall be improved with a paved surface. Such areas shall be so graded and drained so as to dispose of all surface water accumulation within the area as required by the City and the Rice Creek Watershed District. 2. Curbs. A concrete curb and gutter shall be constructed for all developments according to the requirements of the City Engineer except driveways for single and two- family residences. D. Location. All off-street parking spaces herein required shall be located according to the following: 1. Spaces required for one and two family dwellings shall be on the same lot as the principal structure. 2. Spaces required for multiple -family dwellings shall be on the same lot as the principal structure served or within two hundred (200) feet of the main entrance if not located on the same lot. 3. Spaces required for business and industrial uses should be within eight hundred (800) feet of the main entrance to the principal building served. 4. No off-street parking space, with the exception of the driveways, shall be within twenty (20) feet of the right-of-way line of any public street, except in the GB District where the setback shall be fifty (50) feet. 5. In no case shall off-street parking areas containing four (4) or more parking spaces be closer than five (5) feet from any side or rear lot lines, except in the GB District where no such parking shall be closer than twenty (20) feet to any exterior project lot lines other than for joint facilities as permitted herein, or as otherwise permitted in this Code. 6. If required parking is located on a site other than the site on which the principal building or use is located, a properly drawn legal instrument, executed by the parties involved, must be executed and filed with the City and the proper county office, if deemed necessary by the City Attorney, which provides for such parking and which shall not be terminated without approval by the City Council. E. Joint Facilities. The required off-street parking spaces for two (2) or more uses may be located jointly on the same lot, adjoining lot, or in the same structure when 1. The number of spaces provided is equal to or greater than the sum of the separate requirements for each use; and 2. The joint facility is reasonably related to the destination of the user; and 3. It can be demonstrated that there will be no substantial conflict in the principal operating hours of the uses to be served; and 4. Setbacks for such joint parking facilities meet the minimum parking setback requirement from any lot lines other than the common lot lines between the lots involved in the joint parking where setback requirements may be waived; and 5. A properly drawn legal instrument, executed by the parties involved, is filed with the City and the proper county office, if deemed necessary by the City Attorney, which provides for such mutual parking agreement which shall be terminated without the approval of the Council. F. Reduction in Number of Required Spaces. The number of spaces required for a specific use may be reduced if the owner or occupant provides documentation that a lesser number of spaces will actually be needed than normally required by this Code and the City Council authorizes such lesser number after recommendation by the Planning Commission. The difference in the number of spaces provided and those required shall be shown on the approved site plan as "proof -of -parking" and shall be constructed if and when the need for such additional spaces arises. G. Conversion or Alteration of Approved Uses. Commercial or industrial buildings for a use, or uses, which is proposed to be converted, remodeled, or modified to accommodate another allowable use, or uses, which has a greater off-street parking requirement shall be required to apply for Site Plan Review and approval to assure the adequacy of off-street parking. H. Parking Structures. The minimum setbacks of parking structures shall be the same as for principal buildings in the district and the exterior finish shall be compatible with the principal building served by the parking structure. I. Loading Areas and Maneuvering Space. Such areas shall not be used to satisfy the parking requirements in this Section. J. Off Street Parking Spaces Required: Use Bingo Halls Bowling Alleys Business & Professional Office Call Center Churches, Theaters, Auditoriums, Mortuaries, and Other Places of Assembly Required No. of Spaces 1 for each 1.5 max. seating capacity 5 for each lane plus spaces for related uses 1 for each 250 sq. ft. of gross floor area 1 for each 150 sq. ft. of gross floor area 1 for every 3 seats (based on design capacity) Clinics 1 for each doctor or dentist plus 1 for each nurse, technician, or professional and 1 for each 200 sq. ft. of gross floor area Daycare, Nursery, and Pre - School Facility Dwelling, single and two-family Dwelling, multiple family Event Center Inside Motor vehicle Leasing or Sales Motels/Hotels 1 for each teacher or employee plus 1 for each 5 individuals receiving care (design capacity) 2 for each dwelling unit 1.1 per efficiency and 1 bedroom dwelling units; 2 for each 2+ bedroom dwelling units 1 for every 3 seats (based on design capacity) 1 for each 250 sq. ft. of gross floor area used for showrooms, sales, and offices 1 for each employee plus 1 for each unit Multiple Occupancy Structure 1 for each space required for each separate use Other Business and Industry 1 for each employee on major shift plus 1 for each vehicle used in conducting the business or 1 for each 1,000 sq. ft. of floor area, whichever is greater Recreation Facility 1 for each 1.5 persons at design capacity Residential Facility or Group 1 for every 4 residents plus 1 for each employee on Home major shift plus 1 for each on -call medical professional Restaurants, Bars 1 for every 2 seats Restaurant, Fast Food 15 stacking spaces for each customer pickup window plus 1 for each 2 seats Retail Sales 1 for each 150 sq. ft. of gross retail sales floor space Schools, Elementary, and Middle 1 for each staff member plus 3 per classroom School Schools, Secondary 1 for each school employee plus one space per 4 students Service Station 3 for each enclosed bay plus 1 for each employee on peak work shift Uses Not Specifically Noted As determined by City Council after recommendation by Including Public Uses Planning Commission. K. Parking Capacity to be Maintained. 1. Surfacing and striping of parking lots shall be maintained in a manner that will assure that the designated parking capacity is met. 2. Snow storage areas shall be provided so that the number of parking spaces is not reduced below the minimum required. The City may initiate proceedings to require that snow be hauled off the site if parking and circulation problems related to inadequate snow - removal occur. 3. Required parking, loading or maneuvering space shall not be used for the sales, storage, display or leasing of vehicles, boats or products, except for temporary use by special permit. L. Building Permit and Site Plan Approval Required. A building permit shall be required in such case where a commercial, industrial, public or semi-public land use is intending to construct on -site parking containing a site aggregate of more than four (4) spaces or a loading facility that is not a part of, or has prior approval as part of a site plan for which a building permit has been issued. M. Inoperable and Unlicensed Vehicles. Passenger vehicles, recreational vehicles, trucks and watercraft that are in an inoperable condition or are unlicensed or in storage shall not be parked outdoors in the City for a period exceeding seven (7) days. "Inoperable" shall mean incapable of movement under its own power or in need of repair or disposal in a junkyard. Subd. 2 Off -Street Loading. Off-street loading space shall be provided in connection with any use which requires the receipt or distribution of materials by truck. Where noise from such loading space is audible in a residential district, the activity shall terminate between the hours of 7:00 p.m. and 7:00 a.m. Subd. 3 Traffic and Circulation. A. Accessibility to Public Streets. All commercial and industrial buildings or structures and their accessory uses shall be accessible to and from nearby public streets. B. Traffic Control Measures. Vehicular traffic generated by a commercial or industrial use shall be channeled and controlled in a manner that will avoid congestion on the public streets, traffic hazards, and excessive traffic through residential areas, particularly truck traffic. The adequacy of any proposed traffic circulation system to accomplish these objectives shall be determined by the city which may require such additional measures for traffic control as deemed necessary, including, but not limited to the following: Directional signalization, channelization, standby turn lanes, illumination, snow storage area and distribution facilities within the commercial site to prevent backup of vehicles on public streets. Internal site traffic shall be designed to separate perimeter traffic and parking areas. Parking stalls shall be oriented so as to accommodate pedestrian traffic in a safe manner such as, but not limited to, orienting parking aisles toward the principal building entrances. C. Driveways. 1. Driveway widths. The permitted width of accesses to County or State streets or roads is subject to County or State regulations. The following are the required driveway widths for driveways accessing the following types of streets or roads, the measurements being between the edges of the driveway at right angles thereto. Types Residential Commercial Minimum (feet) Maximum (feet) Minimum (feet) Maximum (feet) (a) Minor Streets 10 22 22 32 (b) City Collector Streets 12 22 26 32 2. Minimum Driveway Angle to Public Street: Thirty (30) degrees when the public street is one-way or divided, otherwise sixth (60) degrees. 3. Minimum Distance of Driveway from Street Intersections: Distance shall be measured along street right-of-way line between the nearest driveway edge and the nearest right-of-way line of the intersecting street. If the driveway enters a street classified as a: and the intersecting street is classified as a: and the driveway enters lane approaching or leaving intersection: If the driveway enters a street classified as a: and the intersecting street is classified as a: and the driveway enters lane approaching or leaving intersection: Approach (feet) Leave* (feet) Local Street Local Street, Collector or Minor arterial i5 i5 Local Street Minor Arterial 20 i5 Collector Street Local Street 20 i5 And Minor Arterial Collector, Minor Arterial 25 i5 Major Arterial 35 20 Major Arterial Local Street 20 15 Collector, Minor Arterial 25 15 Major Arterial 40 20 Expressway Ramp 200 100 * Note: Minimum distance to be the same as that specified for approaching lane if left turns are permitted into or out of driveway. * Note: Minimum distance to be the same as that specified for approaching lane if left turns are permitted into or out of driveway. 4. Proximity to lot lines. Access drives maybe placed adjacent to property lines, but in no case shall a driveway be placed nearer than five (5) feet to an existing drive on an abutting parcel. 5. Proximity to residence or other principal building. No access drive shall be closer than three (3) feet to any single- or two-family residence, nor closer than five (5) feet to any other principal building. 6. Traffic Study May Be Required. Any site development that proposed to increase the peak hour traffic on streets or highways near the development, may be required to submit a Traffic Study prepared by a qualified traffic engineer, that defines the impact of the development on the street and highway system and shows techniques to mitigate potential problems. NOTE: See City Code, Chapter 8, for additional on -street parking regulations. 7. Access to streets. Each property which abuts one or more public streets, shall be entitled to at least one access to a public street. Single family uses shall be limited to one (1) access per property. 8. Prohibited areas. In all residential districts, parking shall be prohibited on any area of the property except on designated driveways or parking lots. There shall be no more than four vehicles parked on the driveway. PC Agenda Item — 3B lt ,-iIZEN�HILLS MEMORANDUM DATE: July 10, 2024 TO: Planning Commission Chair and Commissioners FROM: Elena Fransen, Senior Planner SUBJECT: Planning Case #24-014 — Public Hearing Required Applicant: Rose Kukwa Property Location: 3776 Connelly Avenue Request: Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit and Site Plan Review Requested Action Rose Kukwa ("The Applicant") is requesting a Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review to redevelop the existing approximately 11,000 square foot commercial building on the property at 3776 Connelly Avenue ("Subject Property"). The proposal includes a request to allow the use of an Event Center in the B-2 General Business Zoning District, to serve alcohol and food through a State licensed caterer of liquor and food, and for renovations to the exterior of the building. Background 1.Overview of Request The Applicant has submitted a land use application for a Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review to redevelop the existing approximately 11,000 square foot commercial building on the property at 3776 Connelly Avenue. The Subject Property is currently owned by Standout Properties, LLC and the building is occupied by the Northern Lights Bingo Hall and Bright Side Cafe. The Applicant is proposing to renovate the existing building and resurface the parking lot. The Applicant is proposing a phased development with the event center established in Phase I and restaurant and adult day care uses to be established in Phase II and Phase IIl, respectively. The Applicant is seeking review and approval for Phases I and II at this time. The Applicant presented a concept review at the City Council Work session on March 11, 2024. Councilmembers provided feedback on the existing parking lot, landscaping, on -site parking, as well as the process for serving liquor. Page 1 of 24 This commercial corridor is accessible by way of County Road E West. This area is used by a number of small and large businesses for a variety of retail, manufacturing, distribution, warehousing, and office uses. 2. History of the Subject Property The Subject Property was developed in 1986 as a bingo hall consisting of the approximately 11,000 square foot principal structure. A site plan review was required for this development as the property had previously been used as a lumber site. The property changed ownership in 1991 and 2020 with its continued use as a bingo hall which falls under the Commercial Recreation, Indoor land use definition in the City's Zoning Code. In 2020, the property's kitchen was remodeled and the Brightside Caf6 was opened within the existing bingo hall. In 2021, the Brightside Caf6 was approved for a liquor license effective in 2022. In 2023, Northern Lights Bingo Hall ceased bingo game operations and the Subject Property started to be used for organized sports, which also falls under the definition of a Commercial Recreation, Indoor land use with the installation of turf for the rental use of soccer clubs for practices. A liquor license for the Brightside Caf6 was maintained through the end of 2023 but was not renewed for 2024. Approvals 1. Zoning Code Amendment The Applicant is proposing to use the property as an Event Center. Currently, the city code is absent of land use language permitting an Event Center use or establishing standards for the development or operation of an event center within any zoning district. To allow this land use, the City's Zoning Code would need to be amended to add a definition for an Event Center and to designate this type of land use within a zoning district. The proposed Event Center would not be permitted without a zoning code amendment. As part of the land use application, the Applicant has proposed for the use of an event center to be allowed in the B-2 General Business Zoning District through a conditional use permit. The Applicant has stated that the addition of an event center as a conditional use in the B-2 Zoning District aligns with the districts purpose of accommodating commercial activities that serve the local community. The other approvals noted in the land use application would not be applicable unless the Event Center use is permitted within the B-2 General Business Zoning District. 2. Planned Unit Development A Planned Unit Development (PUD) is required for all new development and redevelopment in the B-2 District. In addition, a PUD would allow for performance standard flexibility. This proposal involves both the initial Master Plan PUD and the Final PUD for Phase I and II. Under the PUD Master Plan, the Applicant shall provide details for each stage of development, but would be required to seek the PUD Final Plan approval of Phase III at the time of establishing the future use of an adult day care. The Applicant has provided details in the Architectural Plans (Attachment G) which identifies how the Subject Property would be utilized in Phase I as an event center, Phase II as a restaurant, and Phase III as an adult day care. The Planning Commission should consider the different phases of development while considering the Master and Final PUD as proposed in this application. In this application, the Applicant is seeking approval for Phase I, the event center, and Phase II, which includes the restaurant. The Applicant states in the narrative that Phase II Page 2 of 24 would begin immediately after the completion of Phase I for the event center with the restaurant being operational once a liquor license is obtained. Site Plan ----- _ T_ "(D 3. Conditional Use Permit The Applicant is proposing that in the B-2 District, a Conditional Use Permit is required for an event center. Typical factors to consider in the evaluation of the CUP request may be hours of operation, potential noise from the proposed use, lights from vehicles, and on -site traffic. The Applicant is proposing all events will be held inside the building to contain noise within the venue Page 3 of 24 and their request includes supplementary materials related to a security plan and traffic considerations. City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a Conditional Use Permit. The Planning Commission and City Council should consider the effect of the proposed use upon the health, safety, convenience and general welfare of the owners and occupants of the surrounding land and the community, in general, including but not limited to the following factors: 1. Existing and anticipated traffic and parking conditions; 2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, and other nuisance characteristics; 3. Drainage; 4. Population density; 5. Visual and land use compatibility with uses and structures on surrounding land; 6. Adjoining land values; 7. Park dedications where applicable; 8. Orderly development of the neighborhood and the City within the general purpose and intent of the Zoning Code and the Comprehensive Development Plan for the City. Other Approvals As part of the land use application, the Applicant is proposing an amendment to the City Code to add an event center as a type of business licensed in Arden Hills and to allow for the on -sale liquor sales at an event center through a state licensed caterer. These amendments are proposed in Chapter 3 and 5 of the City Code which establish business licensing and the standards for alcoholic beverages in the City, respectively. Due to State Statute, an event center cannot hold a liquor license. The Applicant has stated in their narrative that in Phase I of the redevelopment, the proposed event center would provide food and alcohol services through caterers with State Licenses. As part of Phase II, the Applicant intends to open the restaurant and to obtain a city liquor license for the restaurant to enhance the dining experience and complement event catering. The Applicant notes that while the intent is to operate the restaurant on the property to serve both food and alcohol, there could be occasions that external catering is utilized to accommodate specific culinary preferences. Allowing the proposed event center to serve alcohol with a licensed caterer would provide for more flexible and inclusive services. City Code text amendments to Chapter 3 and 5 are part of this land use application. The Planning Commission will not be asked to make a finding of fact or consider motion language for the Chapter 3 and 5 City Code amendments. The City Council will review those amendments at a later scheduled date. Zoning Code Text Amendments The purpose of the B-2 General Business District is to: • Be a place in which people can live, work and play. • Create a compact, architecturally diverse, pedestrian- and bicycle -friendly community with a distinct identity. Page 4 of 24 • Provide a connected sidewalk system and places for people to gather and socialize. To implement design standards to promote an attractive environment with lasting and sustainable value. • Group compatible retail and service business uses that tend to draw trade that is naturally interchangeable and promotes business prosperity. • Provide an adequate supply of businesses and professional service areas to meet the needs of the residents. • Minimize the effects of traffic congestion, noise, odor, glare and similar safety problems. According to the Applicant, the proposed ordinance amendment will support the growth and diversification of the local economy while meeting the evolving needs of the community. The Applicant references that event centers have become increasingly popular as venues for various social and corporate events and that allowing for these dedicated facilities would enhance the city's attractiveness as a destination for such gatherings. As proposed, the text amendment would define an Event Center and designate this type of land use as a conditional use in the B-2 General Business District. The Applicant has also proposed Off Street Parking Spaces Required for an Event Center use, specifying 1 space for every 3 seats as the required number of spaces. Staff has prepared text amendments based on the Applicant's narrative as well as a few other criteria suggested by Staff (based on a survey of neighboring communities) for "Event Center" language within Sections 1305.04 Definitions, 1320.05 Land Use Chart, 1320.085 Special Requirements for the B-2 General Business District, and 1325.06 Requirements for Parking, Loading and Circulation. Applicant's Narrative: 1) Add Event Center as a use permitted by a conditional use permit in the B-2 Zoning District in Section 1320.05 Land Use Chart. 2) Establish parking requirements for event centers at 1 parking space per three seats at design capacity in Section 1325.06 Requirements for Parking, Loading and Circulation. Additional Code Amendments to consider: 3) Add a definition for Event Center within Section 1305.04 Definitions a. Event Center: An establishment which is rented by individuals or groups to host scheduled private events including but not limited to weddings, cultural celebrations, corporate functions, and banquets. Such use may or may not include 1) kitchen facilities for the preparation or catering of food; 2) the sale of alcoholic beverages for on -premises consumption only during scheduled events and not open to the general public; and 3) outdoor gardens, patios or outdoor gathering areas. 4) Amend Section 1320.085 Special Requirements for the B-2 General Business District a. Create a new Subdivision 6 — Event Center Additional Conditional Use Permit Criteria that establishes the requirements and criteria for a conditional use permit for Event Center as a conditional use in the B-2 District. Proposed language: A. In addition to meetingthe he requirements of Section 1325 and 1355.04 Subd 4, event centers shall conform to the following: Page 5 of 24 1. The occupancv of the buildiniz must never exceed the occupancv load posted based on the Fire Marshal's determination. 2. The serving of alcohol shall be subject to Minnesota State Statute and Chapter 5 - Alcoholic Beverages of the Arden Hills City Code requirements and is permitted only in conjunction with a private event that is not open to the public. 3. Licensing information from the Ramsey County Sheriff's Office may be requested by City. City could at its discretion request licensing information from the County Sheriffs Office. 4. A security plan shall be submitted and approved by the City, 5. A noise mitigation strategy shall be submitted and approved by the City. B. In addition to meetingthe he requirements of Section 1325 and 1355.04 Subd 4, the City may: 1. Prohibit access from a predominantly residential street; 2. Restrict the hours of operation for loading _ docks; ocks; 3. Require greater than minimum setbacks for structures and driveways; 4. Require opaque screening to eliminate headlight lg are; 5. Impose any other restriction it deems to be in the public interest. For research, staff conducted a survey of other local ordinances and found that Cities of New Brighton, Roseville, Shoreview, Little Canada and Vadnais Heights have language that allows for similar uses with a majority of communities requiring a conditional use permit in at least one commercial zoning district. Parking requirements were also reviewed and fell between one (1) space for every three (3) seats and one (1) space for every four (4) seats. Staff reached out to New Brighton and heard that the primary concerns were proximity to residential neighborhoods and the liquor licensing of vendors. Staff has drafted special requirements for event centers language that considers these potential concerns. The Planning Commission could suggest additional language for the requirements for an event center use related to proximity to residential neighborhoods and parking requirements. The Applicant has requested for the use of an Event Center to be allowed in the B-2 General Business Zoning District through a conditional use permit. The text amendment as drafted would add "Event Center" as a use permitted by a conditional use permit in the B-2 District and would add additional criteria to Section 1320.085 Special Requirements for the B-2 General Business District. The Planning Commission may consider adding the Event Center use permitted by a conditional use permit to additional zoning districts. If identified as an amendment, the Special Requirements could be moved from Section 1320.085 and added to General Regulations in a new Section 1325.047 titled Event Center Additional Conditional Use Permit Criteria. The requirements would then be applicable to the zoning districts that the Planning Commission recommends an Event Center be permitted by conditional use permit. The following are items identified by staff that the Planning Commission may wish to discuss and consider: • Zoning Districts • Permitted hours of operation in the ordinance. • Permitted maximum occupancy in the ordinance. • Specifying if outdoor space is permitted for an event center and if there would be additional requirements. Page 6 of 24 The Planning Commission is asked to review the drafted text amendments and provide comment and suggest applicable revisions to the text as drafted. An ordinance amendment to the Zoning Code requires a public hearing before the Planning Commission. Plan Evaluation Overview of Proposal Redevelopment The Applicant is proposing the redevelopment of the Subject Property as the Elegant Event Center. Improvements will be made to the exterior finishes of the principal structure, the parking lot, and the site's landscaping. Existing conditions for the site can be found on the site survey in Attachment E. The principal structure will remain on site with enhanced building materials and the proposed plans show the addition of a trash enclosure to the north side of the Subject Property. The parking lot improvements include the removal of the existing covered parking structure and the addition of parking islands for additional landscaping and area lighting for the parking lot. Changes to the parking lot include a removal of several existing parking spaces near the property driveway and the establishment of ADA ramps and surfaces and handicap accessible parking spaces. The Applicant states that the plan is to improve and restore both the building and the property so that it will enhance, not detract, from the surrounding area. Business Operations The Applicant is proposing that the Subject Property be used for three different uses within the same principal structure and that these uses will be established through a phased approach. The space is conceived to be shared among the uses with some overlap as noted in the evaluation below. Phase I - Event Center In Phase I, scheduled until December 2024, the building and other site improvements would be completed, and the Event Center use would be established. The proposed hours of operation for the event center are 8:00 a.m. to 11:59 p.m. Monday through Thursday and 8:00 a.m. to 3:00 a.m. Friday through Sunday. The Applicant is requesting City Code Amendments to be allowed to serve liquor and would propose liquor service ending at 2:00 a.m. During Phase I, the Applicant is proposing that food and liquor for the event center will be served through a caterer that holds State licenses for food and liquor. The proposed occupancy for the event center is 464 people, which would include event staff. Access to the event center spaces will be provided through the building's main entry. Patrons would pass through the existing restaurant space to enter the main hall. The existing kitchen is directly adjacent to the main hall space. The main hall space also has access to the existing covered patio space, which will be utilized as a designated smoking area with fencing enclosing the space from the parking lot. Other spaces in the building that could be used during an event include bride and groom suites and an office for event staff. Page 7 of 24 Interior Event Center Floor Plan ' YNU' x � ruLrrmwp wuxiEnLtxxLxlcuEoulP�xrxtuEE BGPEENE9 -WILL BL VN LpAIpa(�,P NG.MEGXLN Cll� (� -WILLNGLBEVn!&FFRCMIHE RGMGFTNY RI `}-fiV.� TIEWELIEPM SIpE OF &JEUMGPYE.6EEPLIXIIHO PUMLt O 0 0 E516XNG ARWiXA ESI6IIXG ExCnHV1GL WrWW�Wxx �x�»3 �Ln 0 , L I •• o � 'b-G' '�-�d' 'b--d' 'b-d' 'b--d' 'b-d' "b-d' 'b-d' 'b--d' °�� o EJBIRaFAnw I aL�ne� rA W I \y LLVa WlxxIXxLL As part of the narrative, the Applicant noted proposed plans for security and noise control. For security, the building is equipped with at least 24 security cameras around and inside the building for monitoring of all areas and there are two police panic buttons inside the building to alert local law enforcement of incidents. The Applicant is proposing that during events there will be onsite security officers to control access points to prevent unauthorized entry, ensure alcohol is not taken onto the patio area, and maintain safety conditions for attendees. Alcohol management is also noted, with a plan for strict protocols for the serving of alcohol to monitor consumption, prevent overconsumption, and ensure compliance with laws and regulations. For noise control, the Applicant proposes a plan, stating all events will be held inside the building to contain noise. Additionally, the use of concrete in the building walls can effectively soundproof and prevent noise from leaving the building, which can reduce the impact of noise on the surrounding community. Security measures will also help manage noise in outdoor areas by managing and dispersing groups that congregate outside, particularly in the designated smoking area. The Applicant is seeking approval for Phase I with this application. The Planning Commission should consider the proposed plans for the Event Center use and the supplementary plans for security and noise management when evaluating the PUD and CUP criteria. Phase II - Restaurant In Phase II, which the Applicant notes will begin immediately after Phase I, involves opening the restaurant area. The Applicant's proposed intent is to obtain a liquor license to provide liquor service on -site once the restaurant is operational. Liquor services would be available to the restaurant as well as the event center during restaurant hours. Currently, on -sale intoxicating liquor licenses are limited to hotels, restaurant, clubs, or exclusive liquor stores. The Applicant states that Page 8 of 24 while the in-house restaurant is intended to serve food and alcohol to events, the event center would on occasion work with external caterers to accommodate specific culinary preferences or cuisines that the restaurant cannot provide. The Applicant reasons that working with outside caterers will support the event center's flexibility and inclusivity of services. The restaurant would use the existing cafe footprint and the proposed restaurant occupancy capacity is 34 seats and five (5) employees to meet staffing needs. Patrons of the restaurant would access the space through the main entry which would lead them directly to the restaurant space which is not being reconfigured from the existing floor plan. The restaurant would utilize the existing on -site kitchen. In Attachment D, the Applicant stated that the restaurant would be operational when the event center space is in use to provide food and beverages to the event but that the restaurant would not be open to the public while the event center is in use. Based on the definitions of a restaurant in Chapter 5 — Alcoholic Beverages, a restaurant with these operational restrictions would not be eligible for an on -sale intoxicating liquor license. Following discussion with Staff, the Applicant has provided an update to the proposal, stating that the restaurant would be open to the public during regular business hours and while the event space is in use for private events. The Applicant provided hours of operations specific to the restaurant use, stating that the restaurant's hours of operations will be 8:00 a.m. to 11:59 p.m. Monday through Sunday. The Applicant is seeking approval for Phase II with this application. Interior Restaurant Floor Plan 0 g�E 3r0Y1VEfE i14 + OFFICE iii EAR 1 kl 111 E%ISTWC TOILET i CL09ET HALLWAY' IIIIUII mFM F1 I I EISTRG ME"TP1LET xliuG 'I 4JNJF T rater p'I _11 RIDOM {nrry C I'RINkLER IFS Phase III —Adult Day Care Page 9 of 24 Phase III, set for August 2025, includes the added operations of an adult day care program. The Applicant is working with the Minnesota Department of Human Services to modify an existing Home and Community -Based Services license. The adult day car program would offer activities such as educational programs, arts and crafts, supervised field trips, board games, and group fitness exercise sessions. The adult day care use would use the main hall of the event center and a floor plan for the use is shown below. The Applicant has stated that the event center use would not overlap with the adult day care use due to the nature of both uses using the main hall of the building. The adult day care space is shown as accessible through the main entry and the side door with access to the covered patio. The proposed occupancy is twenty (20) service participants and four (4) staff. The proposed hours of operations for Adult Day Programs are 8:00 a.m. to 4:00 p.m. Monday through Thursday. The Applicant notes that the restaurant will be operational during the hours of the adult day care to provide lunches to the day care members. Adult day care facility is a permitted use in the B-2 General Business Zoning District. However, the Applicant will be required to submit for a PUD Amendment as part of the phasing plan. A full evaluation of the future adult day care use will be provided once the PUD Amendment is submitted. The Planning Commission should consider the Phase III use with this application and provide comment about possible provisions for this use as it relates to an event center and restaurant within the same shared building. Interior Future Adult Daycare Floor Plan 0 ew�anenrca vxrsduaerrs wuT eo�nT�cx r �. JI 15 0 0 srnnnc Faemiwhw�e 0 axo as sTers ucHesFs. Fj Kffc o FVNpEIIXIT pAYCFAE Chapter 13, Zoning Regulations Review 1. District Provisions (B-2 General Business District) — Section 1320 Under the 2040 Comprehensive Plan, this site is guided as Community Mixed Use (CMU) on the land use plan and is zoned B-2. Page 10 of 24 Direction 2040 Comp. Plan Land Use idoff Zoning Existing Land Uses North RR — Railroad right-of-way/ I/O — Light Industrial and Office Railroad/ I -Flex Railroad/ Industrial Warehouse South CMU — Community Mixed Use B-2 — General Business Parking Lot/ Fast Food Restaurant East CMU — Community Mixed Use B-2 — General Business Parking Lot West VLDR— Very Low Density Residential R-1 — Single Family Residential Single Family Residences The Future Land Use designation is for a broad range of retail, shopping, services, and office space to meet the needs of the community and surrounding areas. This area may also include medium to high density housing with a potential density of three (3) to twenty (20) units per acre. The proposed site plan is attached as Attachment F. Restaurants are a permitted use within this district. The table below provides the performance standards for the B-2 District and the preliminary analysis for the proposed development of the principal structure and the site: Ordinance Requirements B-2 District Standards Proposed Development Maximum Floor Area 0.8 .17 (existing) Ratio Maximum Structure 45% 17% (existing) Coverage Minimum Landscape Lot 20% 23.34% (proposed) Area Minimum Front Yard 50 feet 48.8 feet (existing) Setback Minimum Rear Yard 20 feet +/- 160 feet (existing) Setback Minimum Side Yard 10 feet (min)/20 feet 19.5 feet/ +/-140 feet Setback total(existing) Minimum Lot Area 13,000 square feet 2.19 acres/94,543 square feet(existing) Maximum Building Height 50 feet 20 feet, 11 7/8" +/- existin 2. Design Standards — Section 1325.05 and 1325.055 A. Exterior Materials — Flexibility Requested At least seventy-five (75) percent of the exterior building materials should be made of brick masonry, tile masonry, natural stone or its synthetic equivalent, decorative concrete plank, transparent glass or any combination thereof. Trim and other accent or decorative features may be metal, wood, split faced block, EIFS, or stucco. Metals shall have a matte finish and have visible corner moldings and trim when used on exterior walls. Undesirable materials include simulated brick, vinyl or aluminum siding, sheet or corrugated metal siding, plain concrete blocks or panels, brightly colored metal roofing or canopies, pre -cast tilt -up walls, and mirrored or reflective glass. Building colors shall be muted. Recommended colors include browns, grays, tans, beiges, and dark or muted green, blues, and reds. Bright or brilliant colors and sharply contrasting colors may be used for only accent purposes occupying a maximum of five percent (5%) of building facades. The Planning Commission should evaluate the architectural style and building character based on the quality of its design and on its relationship to its surroundings. Site characteristics to be evaluated for this purpose include, but are not limited to, building and landscaping materials, Page 11 of 24 colors, textures, shapes, massing, building components, height, roof -line, and setback. A full plan set of building elevations is included as Attachment G. Staff has provided the review below on building materials as shared by the Applicant in order for the Planning Commission to attain a better understanding of the full scope of their project design. Building Materials — Flexibility Requested The proposed building elevations consist of brick veneer, transparent glass, metal panels, and wood. The Applicant has requested for the brick veneer to be considered preferred materials as the brick would be actual clay brick, approximately half (1/2) an inch to five eighths (5/8) of an inch thick. Each brick would be individually installed with mortar joints. The Applicant has also requested flexibility from the 75% desirable materials requirement on the south building elevation where there is an existing tall parapet wall above an existing overhang. The Applicant states that there is a concern about this parapet wall's ability to accept additional weight from desirable materials such as brick masonry, tile masonry or natural stone. The proposed south elevation shows metal panels used on the existing parapet wall and the materials for the elevation would consist of 63% desirable materials and 37% accent materials. If these flexibilities in building materials are granted, the Applicant will have met the 75% threshold with desired materials on three elevations based on the calculated use of brick and transparent glass. The Applicant states that the exterior finishes for all elevations would equal 89% desirable materials and 11 % accent materials. Event Center RaMing Required Preferred Materials Proposed Preferred Materials Other Materials Required Transparency Proposed Transparency North Facade 75% 100% 0% N/A 0% EastFagade 75% 96% 4% 50% 11% South Fagade 75% 63% 37% 50% 4% WestFa�ade 75% 95% 5% N/A 1% &_ RenderinzofEast and West Elevations — Event Center Page 12 of 24 Rendering ofSouth and North Elevations — Event Center ----------------------------------------------------- --- ---------------- ----------------- ---------------- --------------------- ------- i i ill ------------------- _======____==m=-=m= =====____ _ 11 !Wzliliv_____ .______-________ _-_-___ _-__-_ _ _ -__ _-_ __ -__-__ __-_-_ _-_ _-= _-_ _-_ __--: _-_ _-_-_ _-_ _ _- __- _- _-_ _ _ __- _- __- _-_ --- _ __ ___ __ Section 1325.05, Subd. 8, F. states that fifty percent (50%) of all first level building fagades that front a public street shall be comprised of transparent windows or doors in order to allow views of interior uses and activities. If the building is a one story design and the first floor elevation exceeds 12 feet, then only the first 12 feet shall be included in calculating the facade area. The south and east elevations of the existing building have some frontage on Connelly Avenue. The Applicant is seeking flexibility from the transparency standard due to the construction of the existing building and the nature of the proposed use. The east elevation of the building is constructed of concrete block with existing covered openings near the roofline. It would be difficult to add a significant number of windows into the existing concrete block walls to meet the 50% requirement. The Applicant also states that the function of an event space requires a certain level of privacy and that windows viewing the activity inside the space would not be conducive to the activity. The Applicant offers that the existing main entrance at the southeast corner of the building consists of glass windows and glass entry doors with additional windows on the south wall. The proposal includes plans to maintain the main entry to allow views of the activities in the restaurant and bar areas of the building. The proposal would still enhance the existing building's appearance while serving the functions inside. B. Building Positioning — Nonconforming Section 1325.05 Subd. 8, E of the Arden Hills City Code states "at least fifty percent (50%) of the largest building on each site shall be constructed at the front setback line." The minimum front yard setback for the B-2 District is 50 feet and the existing front setback line is at 48.8 feet, which encroaches into the minimum setback. The Applicant is not proposing changes to the existing setback and would maintain the existing setback with the proposed development. C. Lighting — Flexibility Requested The Zoning Code requires exterior lighting to be consistent in type, design, scale, and color to create unity in the Districts. Exterior lighting for parking lots and buildings shall not be excessive and shall be directed at their intended purposes. Any light or combination of lights shall not cast light that exceeds a meter reading of one foot candle on the travel lanes of adjoining public streets or 0.4 foot candles on adjoining residential property. Page 13 of 24 The proposed lighting plan includes poly mounted area lights and wall lights to be installed at the south and east elevations. The proposed lighting is consistent with the use and the surrounding area. The Applicant has submitted a photometric plan that identifies the types of light fixtures and quantities. The Subject Property is not adjacent to a residential property. The photometric plan shows that proposed lighting at one location will exceed a meter reading of one foot candle on Connelly Avenue with a reading of 1.4 foot candles. As a condition of approval, all lighting shall be downward directed shoebox style with flush lenses. Details about the proposed lighting are found in Attachment H. D. Site Furnishings — Flexibility Requested Section 1325.05 Subd. 8, J, establishes provisions for site furnishings and seating areas for new development, redevelopment, and modifications to existing sites in the B-2 District. Per the code, benches and decorative plantings shall be provided near the primary entrance of all buildings on a site. The Applicant has not indicated plans for benches or plantings to be placed near the entrance to the proposed event center. Also noted in J of Subd. 8, restaurants shall include a functional outdoor seating area with tables, chairs, planting and access to the restaurant. As a restaurant is part of the Master PUD, and the use will be established at the Subject Property in Phase II of development, the proposed development is subject to this requirement. The Applicant noted in this application that there are no plans for an outdoor seating area and that the porch area on the east side of the building is a designated smoke area and would not be used for outside seating for the restaurant or the event center. The Applicant also stated as part of the narrative that the proposed development is intended to be fully enclosed to ensure noise is contained within the venue. The Planning Commission may comment on the proposed site furnishings as they apply to both Phase I and Phase II of development. E. Screening — For Review Under Section 1325.05, Subd. 8, K, Trash and recycling equipment, materials, and containers shall be fully enclosed and integrated into the architecture of the buildings. All mechanical equipment, whether roof -mounted or ground -mounted should be integrated into the architecture of the building. It shall be completely screened from the ground -level view of adjacent properties and public streets. Wood screening shall not be permitted. There is a trash enclosure proposed for the Subject Property and located on the north side of the site. This enclosure will feature metal trash enclosure gates and the other three elevations will be constructed of a metal panel material consistent with the building design. The Applicant has noted that all mechanical equipment is located on the ground along the west side of the building. There are no existing roof -mounted systems, and none will be added as part of the proposed development. The Applicant is proposing all ground mounted mechanical equipment will be screened from view by new on -site landscaping which is shown in the landscaping plans in Attachment F. The Applicant states that the equipment will not be visible from the right of way on the west side of Snelling Avenue. The Planning Commission should comment as part of the review if the proposed screening is sufficient. F. Landscaping — Flexibility Requested Page 14 of 24 Section 1320.06 — District Requirements Chart of the City Code requires a minimum landscape lot area of 20% or 18,908.6 square feet for the Subject Property in the B-2 District. The Applicant is proposing a landscape lot area of approximately 23.34% percent or 22,067 square feet. Additionally, at least 10% or 2,206.7 square feet of the total landscaped area (i.e. 22,067 square feet) shall be covered with perennials and/or shrubbery. The Applicant is proposing perennial and/or shrubbery of approximately 23.63% or 5,214.5 square feet. Planting islands shall occupy 10% or 6,478.8 square feet of the parking area (i.e. 64,788 square feet). The landscaping plans show seven (7) proposed parking islands but do not indicate the total square feet of the provided planting islands. Additionally, per City Code, planting islands shall be edged with concrete curbs. Parking lot planting islands shall be a minimum of 150 square feet in area, be of appropriate width and length, and include at least one tree to meet the requirements of this ordinance. The Applicant has stated a request for flexibility from the planting islands requirements for concrete curbs and one tree per parking lot planting island. Plans show that six (6) of the seven (7) parking lot planting islands will not have a tree planted and that one (1) planting island would have three (3) trees planted. The request notes that the proposed plans do not include new curb and gutter for parking lot planting islands in order to maintain existing drainage patterns and to allow site lighting in lieu of trees within six (6) of the proposed islands to provide adequate lighting to the site. The site contains approximately 145 caliper inches of significant trees. Section 1325.055 Subd. 5 allows for the removal of fewer than ten (10) percent of the caliper inches of significant trees on the property without requiring mitigation. Ten percent of 145 is 14.5 caliper inches. The Applicant proposes removing 118 caliper inches of trees, meaning the Applicant is responsible for mitigation of 103.5 caliper inches removed above 10 percent. Per Section 1325.055 Subd 6, the number of caliper inches of trees required for replanting is determined at a rate of 1:2 or one inch replaced for every two inches lost. The Applicant intends to replace the 61 caliper inches required based on the total inches removed and the rate of replacement. Existing 10% of Proposed Inches in Required Proposed Existing Removal excess of 10% Replacement Replacement 145 caliper 14.5 caliper 118 caliper 103.5 caliper 51.75 caliper 61 caliper inches inches inches inches inches inches The City Code requires a minimum of one (1) tree be provided along the right-of-way of every 50 feet of public street frontage. The Subject Property survey shows the south property line with frontage on Connelly Avenue has 248 feet of frontage. The proposed development would be required to plant five (5) trees along the Connelly Avenue right-of-way. Right-of-way tree plantings are not shown in the plans and is considered a request for flexibility. G. Snow Storage — For Review Adequate area should be designed for snow storage such that clear visibility shall be afforded from the property to any public street. The Applicant has identified in their narrative and on a Plan Sheet C-B in the Civil Plans (Attachment F) that snow storage would be located at the four corners of the property. The plan shows that if the snow accumulation exceeds capacity available for on -site storage, the Applicant intends to have snow hauled off -site with a snow removal vendor. H. Parking Setbacks — Meets Requirements Page 15 of 24 The City Code requires off-street parking spaces to be located a minimum of 20 feet from the right-of-way of any public street. The Applicant has satisfied this requirement and has an approximately 28-foot setback from the ROW along Connelly Avenue. For side and rear setbacks, off-street parking spaces are required to be located a minimum of 5 feet from rear and side lot lines. The paving plan shown on Plan Sheet C3 in the Civil Plans indicates parking spaces will be setback ten (10) feet from the west side property line, five (5) feet from the north rear property line, and five (5) feet from the east side property. Plans indicate that the Applicant would satisfy the requirements for off-street parking space setbacks. I. Number of Parking Stalls — Flexibility Requested Per City Code 1325.06, there are general categories that determine the number of parking spaces that would need to be provided, but an event center as a principal use is not specifically identified. As part of the land use application for a Zoning Code Amendment, the Applicant has provided the following provisions to apply based on the proposed use as an event center: • Event Center — one (1) parking space for every three (3) seats at designed capacity. The Applicant is proposing the replacement of the existing parking lot with 145 parking stalls including 5 accessible stalls. Based on a review of Ramsey County Aerial Data from 2022, the Subject Property was last identified to have 74 striped parking spaces. The proposed parking replacement would result in a decrease of approximately 2,000 square feet in parking lot. The proposal includes the addition of parking islands for lighting and landscaping that do not exist on site. The proposed plan for Phase I would consist of an event center building of approximately 11,000 square feet with a designed capacity for 464 people. At the proposed provision for the minimum off-street parking requirement, the proposed design capacity of 464 people would require 155 spaces. As such, the Applicant is seeking flexibility to provide 145 parking spaces instead of the calculated requirement of 155 for the event center use. The Applicant states that 145 spaces will be sufficient as it is not anticipated to have 464 people on site simultaneously. It is noted that attendees of conferences, weddings, and performances often carpool, resulting in a higher average car occupancy. The requested flexibility would allow for a balance between providing parking and maintaining landscaping within the community. In Phase II, the proposed restaurant use is evaluated based on the provisions for a Restaurants, Bars use: • Restaurants, Bards — one (1) for every two (2) seats. The proposed plan for Phase II would consist of the restaurant portion of the building with a designed capacity of 34 people. Based on this provision, 17 parking spaces would be required. As the event center and restaurant uses would be operational simultaneously, the parking requirements for both uses apply. A minimum of 172 parking spaces would be required for the event center and restaurant. By proposing 145 parking spaces for the site, the Applicant is seeking flexibility for the 27 parking spaces not provided. The Applicant states that the 145 parking spaces should be sufficient as it is not anticipated that there will be a time when the 464 person occupancy capacity is reached on site. The Planning Commission should review the requested flexibility for parking to determine if the parking proposed is sufficient for the proposed development with the event center and restaurant uses. Page 16 of 24 J. Traffic Study and Site Circulation — For Review The site currently has one access point to the Subject Property along Connelly Avenue and no changes are proposed to the current configuration. Under Section 1325.05, Subd. 8, a traffic study shall be required for all new developments, redevelopments, and significant modifications to existing sites. A traffic study has been prepared (see Attachment I for summary section of report). The traffic report compares the Phase I event center proposal to the existing bingo hall use during weekday AM and PM peak hours. The memo dated June 10, 2024 prepared by SEH notes that the redevelopment of the site to an event center is expected to generate approximately 130 entering trips in a one -hour period prior to an event and 62 exiting trips after the event. The Phase II restaurant use was not included in the provided traffic comparison or summary. Compared to the existing use, there would be an additional 120 trips entering in one hour and fewer trips expected to exit during one hour after an event. It is anticipated that the proposed business would generate less than 400 trips in one day, likely on a weekend with an evening event at maximum capacity. The Memo concludes that the anticipated traffic generated is not expected to impact the operations or safety of Connelly Avenue or its intersections with County Road E. The peak hours of events may conflict for a short amount of time with other adjacent businesses and the signal at County Road E and Connelly Avenue to monitor timings and make minor adjustments as needed. The Applicant was asked to demonstrate how larger trucks would maneuver internally. The Applicant did provide as part of their submission illustrating vehicle movements. This plan sheet is included in the civil plans within Attachment F. The Fire Marshall is still reviewing this application and has yet to provide formal comments. K. Pedestrian and Bicycle Circulation — For Review Pedestrian and bicycle improvements shall be installed in accordance with the City of Arden Hills Comprehensive Plan. The Applicant has provided a pedestrian circulation plan as part of the Civil Plans which shows site navigation for pedestrians. There is not an existing public sidewalk or trail network for an internal sidewalk system to link to adjacent to the Subject Property. The Applicant is proposing a bicycle rack/bicycle parking as part of this development located near the southeast corner of the building. The submitted Civil Plans show seven (7) bicycle spaces. City Code Section 1325.05 Subd, 8, Q does require one (1) space for every 20 parking spaces. Commercial developments are required to have a minimum of two (2) bicycle parking spaces. L. Freestanding Signs — Nonconforming, Flexibility Requested The Subject Property is located in Sign District 7. Properties in Sign District 7 are allowed one (1) freestanding sign measuring up to 25 square feet in copy area and not exceeding 8 feet in height. Freestanding signs shall be located at least five (5) feet from any property line. Sign copy area is defined as the area in square feet of the smallest rectangle, circle, or triangle that contains the sign copy. Signs in Sign District 7 may be lit by external illumination only. The Applicant is proposing to reface an existing freestanding pole sign located on the west side of the property. The existing pole sign is nonconforming with the height, illumination, and sign copy area requirements for freestanding signs in Sign District 7. The proposed internally illuminated sign would be approximately 16 feet in height and have a total sign copy area of approximately 23.2 square feet. Also, the total area of a freestanding sign shall not exceed 1.5 times the permitted sign copy area of said sign which would be 34.8 square feet for this application. The proposed Page 17 of 24 freestanding sign has a total area of 40.4 square feet. The sign plans are shown on Page A5.1 in Attachment G. Existing Pole Sign 13NORrMERN L,,ji,, 1 Nr_JV% Proposed Freestanding Sign TOTAL,uFtEA uF E40w MMTALNGINO: POW 04N; 40A 8F JRLOAN&EAREA 1Ah PM=W L_--_1--_--� II . TOTAL *MA✓�;2026F + UDMBLE AREA w SF + al FREESTANDING POLE SIGN ELEVATION M. Wall Signs — Flexibility Requested Properties in Sign District 7 are allowed wall signs up to 45 square feet and signs may be externally and internally illuminated. The Applicant is proposing one (1) internally illuminated 41 square foot wall sign to be located on the east elevation above the main entry. The sign plans also show a graphic sign located on the south elevation above the main entry. The city code defines a graphic sign as "a sculpture attached to or sign painted directly on a wall that is primarily symbolic or representational in nature and not alpha or numeric in content or copy." The sign ordinance does not permit graphic signs in Sign District 7. The Applicant is seeking flexibility to install the graphic wall sign. �1 !.4 CANOPY -SOUTH r1 CANOPY - EAST._.._--__ ._-....,_. ' IM" T-0' 3. Procedural Requirements for Specific Applications —Section 1355.04 A public hearing for a CUP and PUD request is required before the request can be brought before the City Council. The applicant or its representative shall be given the opportunity to appear before Page 18 of 24 the Planning Commission to answer questions or give explanations regarding the proposal. Upon completion of the public hearing and its study and consideration of the application, the Planning Commission shall submit its written report, containing its findings, conclusions, and recommendations as to the application, to the City Council. Plan Evaluation Summary The table below provides the performance standards for the B-2 District and the preliminary analysis for the proposed development: finance Re uireme -2 District Standards Proposed Development Maximum Floor Area Ratio 0.8 0.17 Maximum Building Height 50 feet 20 feet, 11 7/8" +/- Maximum Structure Coverage 45% 17% Minimum Landscape Lot Area 20% 23.34% Minimum Front Yard Setback 50 feet 48.8 feet Minimum Rear Yard Setback 20 feet +/- 160 feet Minimum Side Yard Setback 10 feet min /20 feet total 19.5 feet/ +/-140 feet Building Positioning 50 feet 48.8 feet Minimum Parking Requirements Restaurant: 1 space per 2 seats 145 spaces Event Center: 1 space per 3 seats Total Required- 172 spaces) Off -Street Parking Setbacks 20 feet from ROW +/- 25 feet from ROW Building Fa ade Transparency 50% transparency at front Seeking Flexibility Building Materials 75% brick, tile, natural stone, Seeking Flexibility decorative concrete, transparent lass or any combination thereof Lighting Not to exceed one foot candle on Seeking Flexibility, 1.4 foot candles the travel lanes of adjoining public shown on photometric plan streets Screening/Fencing Trash to be enclosed, equipment to Trash enclosure proposed, be screened landscaping for screening Site Furnishings Benches and decorative plantings, Seeking Flexibility restaurants with outdoor seating area Landscaping — Planting Island requirements for Seeking Flexibility Perennial/Shrubs/Planting Islands trees and curb Landscaping — Tree Mitigation 51.75 caliper inches required for 61 caliper inches proposed for replacement replacement Landscaping — Boulevard and Boulevard Trees — 5 Boulevard Trees — 0 Island Trees Island Trees — 7 Island Trees — 3 Pedestrian and Bicycle Circulation Provide circulation plan and bike Bike Rack and plan rack Freestanding Signage — Total Sign 34.8 square feet Seeking Flexibility, 40.4 square feet Area Wall Signage Sign District 7 (graphic sign not Graphic Sign proposed ermitted Additional Review Building Official The Building Official has reviewed the plans and has no additional comments at this time. A Building Permit will be required prior to any construction taking place. Page 19 of 24 Public Works Director/City Engineer The Public Works Director/City Engineer has reviewed the plans. The following comments have been provided: • Applicant shall apply for a City Grading and Erosion Control permit and submit the total area of reconstructed surface. • Applicant shall contact Rice Creek Watershed District to verify if a watershed permit is needed. • The City has received complaints of vehicle traffic that exits this property. The complaint is vehicles do not stop or yield while existing which causes issues with traffic on Connelly Avenue. Fire Marshal The Fire Marshal is currently reviewing the plans. No additional conditions have been included at this time. Findings of Fact Zoning Code Text Amendment Findings: 1. Rose Kukwa, the Applicant, is proposing amendments to the language of Chapter 13 — Zoning Code of the City Code. 2. Under the City's Zoning Code Section 1305.04, Definitions, the City does not define an event center use. 3. The Applicant is proposing an amendment to define an event center and allow for the use in the B-2 General Business District through a conditional use permit. 4. The Applicant is proposing additional criteria in the ordinance language to establish a minimum parking requirement of 1 parking per 3 seats at design capacity. 5. Of local communities surveyed, the majority allow an event center use through a conditional use permit in at least one commercial zoning district. 6. Amendments to the Zoning Code regulations require a public hearing prior to action by the City Council. Planned Unit Development and Conditional Use Permit Findings: 1. The property located at 3776 Connelly Avenue is designated for Community Mixed uses on the 2040 Comprehensive Plan. 2. New building construction or site modification identified requires the submittal of a Site Plan Review application prior to construction. 3. For proposals for new construction, redevelopment of a site, and significant modifications to existing sites a PUD is required. 4. The PUD process allows for flexibility within the City's regulations through a negotiated process with a Developer. 5. The Applicant has proposed a Master and Final Planned Unit Development for the development of one approximate 11,000 square foot event center with additional restaurant and adult day care uses on the Subject Property. 6. The Applicant has proposed a phased development plan with Phase I referred to as the event center to be established following the land use approvals herein, Phase II referred to as the restaurant to be established directly following Phase I and for Phase III referred to as the adult day care to be established approximately one (1) year later, Page 20 of 24 7. The Applicant has proposed for the approval of Phase I for an event center and Phase II for a restaurant as part of the Master PUD and will need to submit for a Final PUD amendment approval for Phase III for the adult day care use. 8. The Master and Final Planned Unit Development generally conforms to the requirements of the City Zoning Code and design standards. 9. Where the plan is not in conformance with the City Code, flexibility has been requested by the Applicant. 10. Flexibility through the PUD process has been requested in the following areas: parking requirements, landscaping, building materials, transparency, signage, lighting, and site furnishings. 11. A public hearing for a Master Planned Unit Development, Final Planned Unit Development, and Conditional Use Permit request is required before the request can be brought before the City Council. Options and Motion Lan2ua2e Staff has provided the following options and motion language for this case the Planning Commission should consider providing additional findings of fact as part of the motion to support their recommendation for approval or detail. Zoning Code Text Amendment • Recommend Approval: Motion to recommend approval of Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit, based on the findings of fact and submitted materials. • Recommend Approval with Amendments: Motion to recommend approval of Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit, based on the findings of fact and submitted materials, with amendments: a specific reason should be included with all amendments. • Recommend Denial: Motion to recommend denial of Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit, based on the following findings: findings to deny should specifically reference the reasons for denial and why those reasons cannot be mitigated. • Table: Motion to table of Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit: a specific reason and information request should be included with a motion to table. Planned Unit Development and Conditional Use Permit Page 21 of 24 • Recommend Approval with Conditions: Motion to recommend approval of Planning Case 24-014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an Event Center and Restaurant at 3776 Connelly Avenue, based on the findings of fact and the submitted plans, as amended by the conditions in the July 10, 2024 Report to the Planning Commission: 1. The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the Community Development Director, shall require review and approval by the Planning Commission and City Council. 2. The Master Planned Unit Development and Final Planned Unit Development for Phases I and II shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by the City Council. The City Council may extend the expiration date of such approval upon written application by the person to whom the approval was granted. 3. A violation of any condition set forth in the permit shall be a violation of this Code, and shall be cause for revocation of the permit. 4. A Master and Final PUD Development Agreement shall be prepared by the City Attorney and subject to City Council approval for the Development for the exterior car wash. The Master and Final PUD Development Agreement shall be fully executed prior to the issuance of building permits. Prior to the issuance of a building permit, a landscape financial security equal to 125% of the cost of the landscaping to be installed on the site shall be submitted. The Applicant must submit a detailed cost estimate for the landscaping so staff can determine the final amount. Landscape financial security shall be held for two full growing seasons. For any landscaping that is not in accordance with the approved landscaping plan at the end of two growing seasons, the Developer shall replace the material to the satisfaction of the City before the guarantee is released. Where this is not done, the City, at its sole discretion, may use the proceeds of the performance guarantee to accomplish performance. 5. A Grading and Erosion permit shall be obtained from the city's Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey County (i.e. ROW or access) prior to the start of any site activities. 6. The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit. 7. Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and Community Development Director prior to the issuance of a grading and erosion control permit or other development permits. 8. Upon completion of grading and utility work on the site, a grading as -built and utility as -built shall be provided to the City for review. 9. Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site. 10. The Applicant shall be responsible for protecting the proposed on -site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. Page 22 of 24 Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant. 11. All light poles, including base, shall be a maximum of 25 feet in height and shall be shoebox style, downward directed, with high-pressure sodium lamps or LED and flush lenses. 12. All rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. 13. A separate sign permit shall be required for all signs on the site. 14. Any future trash and vacuum enclosures shall utilize gates and be constructed on three sides using the same materials and patterns used on the building. Locations shall be approved by the Planning Department. 15. The Applicant shall be financially responsible for all applicable water and sanitary charges. Rates applied shall be memorialized in the Development Agreement. 16. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shall mow and maintain all site boulevards to the curb line of the public streets. 17. The proposed structure shall conform to all other regulations in the City Code. • Recommend Approval as Submitted: Motion to recommend approval of Planning Case 24- 014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an event center and restaurant at 3776 Connelly Avenue, based on the findings of fact and the submitted plans in the July 10, 2024 Report to the Planning Commission. • Recommend Denial: Motion to recommend denial of Planning Case 24-014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an event center and restaurant at 3776 Connelly Avenue, based on the following findings: findings to deny should specifically reference the reasons for denial and why those reasons cannot be mitigated. • Table: Motion to table Planning Case 24-014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an event center and restaurant at 3776 Connelly Avenue: a specific reason and information request should be included with a motion to table. Public Comments Notice was published in the Pioneer Press on June 28, 2024. Notice was prepared by the City and mailed to property owners within 1,000 feet of the subject property. The City has not received any public comments regarding this case. Deadline for Agency Actions The City of Arden Hills received the completed application for this request on June 12, 2024. Pursuant to Minnesota State Statute, the City must act on this request by August 10, 2024 (60 days), unless the City provides the petitioner with written reasons for an additional 60-day review period. With consent of the applicant, the City may extend the review period beyond the initial 120 days. Page 23 of 24 Attachments A. Land Use Application B. Location Map C. Narrative D. Requests for Flexibility E. Site Survey F. Civil and Landscape Plans G. Architectural Plans H. Lighting Plan I. Traffic Study I Existing Site and Proposed Site Renderings K. Draft Amendment Section 1305.04 L. Draft Amendment Section 1320.05 M. Draft Amendment Section 1320.085 N. Draft Amendment Section 1325.06 Page 24 of 24 ARDEN HILLS PLANNING COMMISSION — July 10, 2024 10 Commissioner Bjorklund indicated he could support the waiver of the park dedication fee because this project was for the public good. Chair Weber commented on how the City would be taking a significant loss on this project. He discussed how the City was struggling to find funding for its own public trails. He stated he was not comfortable with the loss the City would be taking. He expressed frustration with the fact Bethel University had not paid the park dedication fees for this land. Commissioner Blilie stated she was uncomfortable requiring the fire department pay the park dedication fees, especially given the fact Bethel should have been responsible. Commissioner Mitchell indicated she was comfortable with waiving the park dedication fees given the fact the fire station would be a public benefit. Commissioner Bjorklund anticipated because Bethel University sold the land to the Fire Department, they got out of paying the park dedication fee. He did not support claiming the park dedication fee from the fire department. Chair Weber discussed how the funding would not come from the fire department, but rather would be paid by the cities of Shoreview and North Oaks, with a small portion coming from Arden Hills. Given the history of this project, he indicated he could forego the payment of the park dedication fees. Motion amendment moved by Commissioner Mitchell, seconded by Commissioner Bjorklund, to add Condition 20 to read: The Public Use Dedication/Park Dedication fee be waived for future development of Lot 2, Block 1 of the 2 Pine Tree North plat. The amended motion carried unanimously (6-0). B. Planning Case 24-014; 3776 Connelly Avenue — Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, And Site Plan Review — Public Hearing Senior Planner Fransen stated the Applicant has submitted a land use application for a Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review to redevelop the existing approximately 11,000 square foot commercial building on the property at 3776 Connelly Avenue. The Subject Property is currently owned by Standout Properties, LLC and the building is occupied by the Northern Lights Bingo Hall and Bright Side Cafe. The Applicant is proposing to renovate the existing building and resurface the parking lot. The Applicant is proposing a phased development with the event center established in Phase I and restaurant and adult day care uses to be established in Phase II and Phase III, respectively. Senior Planner Fransen reported the Applicant is seeking review and approval for Phases I and II at this time. The Applicant presented a concept review at the City Council Work session on March 11, 2024. Councilmembers provided feedback on the existing parking lot, landscaping, on -site parking, as well as the process for serving liquor. This commercial corridor is accessible ARDEN HILLS PLANNING COMMISSION — July 10, 2024 11 by way of County Road E West. This area is used by a number of small and large businesses for a variety of retail, manufacturing, distribution, warehousing, and office uses. Senior Planner Fransen reviewed the history of the subject property, the zoning code text amendments, the Plan Evaluation and provided the Findings of Fact for review: Zoning Code Text Amendment Findings: 1. Rose Kukwa, the Applicant, is proposing amendments to the language of Chapter 13 — Zoning Code of the City Code. 2. Under the City's Zoning Code Section 1305.04, Definitions, the City does not define an event center use. 3. The Applicant is proposing an amendment to define an event center and allow for the use in the B-2 General Business District through a conditional use permit. 4. The Applicant is proposing additional criteria in the ordinance language to establish a minimum parking requirement of 1 parking per 3 seats at design capacity. 5. Of local communities surveyed, the majority allow an event center use through a conditional use permit in at least one commercial zoning district. 6. Amendments to the Zoning Code regulations require a public hearing prior to action by the City Council. Planned Unit Development and Conditional Use Permit Findings: 1. The property located at 3776 Connelly Avenue is designated for Community Mixed uses on the 2040 Comprehensive Plan. 2. New building construction or site modification identified requires the submittal of a Site Plan Review application prior to construction. 3. For proposals for new construction, redevelopment of a site, and significant modifications to existing sites a PUD is required. 4. The PUD process allows for flexibility within the City's regulations through a negotiated process with a Developer. 5. The Applicant has proposed a Master and Final Planned Unit Development for the development of one approximate 11,000 square foot event center with additional restaurant and adult day care uses on the Subject Property. 6. The Applicant has proposed a phased development plan with Phase I referred to as the event center to be established following the land use approvals herein, Phase II referred to as the restaurant to be established directly following Phase I and for Phase III referred to as the adult day care to be established approximately one (1) year later. 7. The Applicant has proposed for the approval of Phase I for an event center and Phase II for a restaurant as part of the Master PUD and will need to submit for a Final PUD amendment approval for Phase III for the adult day care use. 8. The Master and Final Planned Unit Development generally conforms to the requirements of the City Zoning Code and design standards. 9. Where the plan is not in conformance with the City Code, flexibility has been requested by the Applicant. 10. Flexibility through the PUD process has been requested in the following areas: parking requirements, landscaping, building materials, transparency, signage, lighting, and site furnishings. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 12 11. A public hearing for a Master Planned Unit Development, Final Planned Unit Development, and Conditional Use Permit request is required before the request can be brought before the City Council. Senior Planner Fransen reviewed the options available to the Planning Commission for Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit, based on the findings of fact and submitted materials: 1. Recommend Approval as Submitted 2. Recommend Approval with Amendments 3. Recommend Denial 4. Table Senior Planner Fransen also reviewed the options available to the Planning Commission for Planning Case 24-014 for a master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an Event Center and Restaurant at 3776 Connelly Avenue, based on the findings of fact and submitted materials, as amended by the conditions in the July 10, 2024 Report to the Planning Commission: 1. Recommend Approval with Conditions 1) The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the Community Development Director, shall require review and approval by the Planning Commission and City Council. 2) The Master Planned Unit Development and Final Planned Unit Development for Phases I and II shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by the City Council. The City Council may extend the expiration date of such approval upon written application by the person to whom the approval was granted. 3) A violation of any condition set forth in the permit shall be a violation of this Code, and shall be cause for revocation of the permit. 4) A Master and Final PUD Development Agreement shall be prepared by the City Attorney and subject to City Council approval for the Development. The Master and Final PUD Development Agreement shall be fully executed prior to the issuance of building permits. Prior to the issuance of a building permit, a landscape financial security equal to 125% of the cost of the landscaping to be installed on the site shall be submitted. The Applicant must submit a detailed cost estimate for the landscaping so staff can determine the final amount. Landscape financial security shall be held for two full growing seasons. For any landscaping that is not in accordance with the approved landscaping plan at the end of two growing seasons, the Developer shall replace the material to the satisfaction of the City before the guarantee is released. Where this is not done, the City, at its sole discretion, may use the proceeds of the performance guarantee to accomplish performance. 5) A Grading and Erosion permit shall be obtained from the city's Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including ARDEN HILLS PLANNING COMMISSION — July 10, 2024 13 but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey County (i.e. ROW or access) prior to the start of any site activities. 6) The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit. 7) Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and Community Development Director prior to the issuance of a grading and erosion control permit or other development permits. 8) Upon completion of grading and utility work on the site, a grading as -built and utility as - built shall be provided to the City for review. 9) Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site. 10) The Applicant shall be responsible for protecting the proposed on -site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant. 11) All light poles, including base, shall be a maximum of 25 feet in height and shall be shoebox style, downward directed, with high-pressure sodium lamps or LED and flush lenses. 12) All rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. 13) A separate sign permit shall be required for all signs on the site. 14) Any future trash and vacuum enclosures shall utilize gates and be constructed on three sides using the same materials and patterns used on the building. Locations shall be approved by the Planning Department. 15) The Applicant shall be financially responsible for all applicable water and sanitary charges. Rates applied shall be memorialized in the Development Agreement. 16) All disturbed boulevards shall be restored with sod. All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shall mow and maintain all site boulevards to the curb line of the public streets. 17) The proposed structure shall conform to all other regulations in the City Code. 2. Recommend Approval as Submitted 3. Recommend Denial 4. Table Chair Weber opened the public hearing at 9:13 p.m. Chair Weber invited anyone for or against the application to come forward and make comment. There being no comment Chair Weber closed the public hearing at 9:13 p.m. Chair Weber asked if there would be a full depth replacement of the parking lot. Senior Planner Fransen deferred this question to the applicant. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 14 Ian Weber, Civil Engineer at Anderson Engineering, explained there would be a partial full depth replacement along with a mill and overlay of the existing parking lot. Chair Weber questioned where the 248 feet of frontage was along Connelly. He anticipated the frontage shown along Connelly belonged to Flaherty's. Commissioner Erler indicated he had the same question and stated the frontage along Connelly was the driveway. Senior Planner Fransen stated this matter could be verified by staff. Chair Weber asked why there was no stormwater management plan for this project. Senior Planner Fransen explained staff understood that the existing drainage patterns would be maintained. She indicated the City Engineer had reviewed the plans and had noted the permits that were necessary for this plan. She reported staff could follow up with the City Engineer to verify if there were any further comments. Chair Weber indicated he was asking questions about drainage due to the size of the lot. He anticipated an NPDES permit along with some sort of stormwater management onsite. He supported the site having proper stormwater management onsite. He asked if the restaurant would be open to the public during adult daycare. Rose Kukwa, the applicant, thanked the Commission for considering her request. She noted the restaurant would be open to the public during daycare hours. Chair Weber questioned why the applicant believed it was not conducive to have additional windows onsite. Ms. Kukwa explained the events she would be hosting would be private in nature and she did not believe it was necessary for passersby to view the events. However, she noted the restaurant portion of the building would have windows to see through. Chair Weber asked what supplies the applicant would be sourcing locally. Ms. Kukwa stated she had decorating vendors and caterers that were local. She explained she intended to get contracts in place with these vendors to assist with her events. Chair Weber requested further information on why the event center would be open until 3:00 a.m. Ms. Kukwa reported there were certain types of events that will go later than others and she would like to be able to host a wide variety of events. In addition, she noted alcohol could be served until 2:00 a.m. Chair Weber inquired who identified the structural concern with the parapet wall. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 15 Bob Vanney, Vanney Architect Associates, explained he was responsible for the design. He reported the existing overhang was wood. He stated he did not believe it was proper to add additional weight to the wooden overhang. For this reason, he recommended a lighter weight metal material was proposed to be used. Chair Weber commented on how the parapet could be viewed as an accent to the building and asked if the City would allow the metal material. Senior Planner Fransen discussed how exterior building materials are defined within City Code and explained metal was allowed as an accent material. Commissioner Bjorklund asked when this building was constructed. Senior Planner Fransen stated the building was originally used as a lumber yard and it turned into a bingo hall in 1986. Commissioner Erler reported this building was standing in the late 1950's. Commissioner Erler questioned if the church agreed to have overflow parking on their site. Ms. Kukwa stated she recently learned that due to renovations at the church no overflow parking would be allowed at the church. She did not anticipate needing any overflow parking as the site had 145 parking spaces. Commissioner Erler commented on the screening for the mechanicals and asked if the dogwoods would screen the equipment in the winter months. Mr. Weber, Anderson Engineering of MN, explained the plan prepared by his landscaping architects and noted he would be amenable to changing the species. He understood the dogwoods would provide screening in the winter months. He commented further on the stormwater management for the site, stating during his initial conversations with the watershed district he noted the proposed plan reduces the overall impervious surface on the site. He explained this meant the water leaving the site would be less than it is today. He reported he would continue to work with the watershed district and go through the review process with the City Engineer. Commissioner Bjorklund discussed the landscaping plan and was of the opinion the reality of the drip line for the trees was vastly misrepresented. Commissioner Blilie asked what the Commission was considering for this item. Senior Planner Fransen stated the Commission was being asked to consider a zoning code amendment along with a Master PUD, Final PUD, CUP and Site Plan Review. Commissioner Blilie inquired if the large parking lot behind Flaherty's was owned by Flaherty's. Senior Planner Fransen reported this was the case. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 16 Commissioner Mitchell questioned what the maximum capacity would be for the event space. Senior Planner Fransen stated the maximum capacity would be 464 people. Commissioner Mitchell inquired if the main entrance to the event space would through the cafe. Community Development Director Jagoe suggested the applicant speak further to the occupancy of the building and how people would flow through the site. She indicated 464 total people could be on the site, but noted this included event center attendees, caterers and those within the restaurant. Senior Planner Fransen reported the Applicant stated the occupancy has been discussed with the fire marshal. Ms. Kukwa explained the occupancy was 464, as determined by the fire marshal. She indicated visitors to the event center could enter through the front door or the side entrance. She noted the building had four exits. Commissioner Bjorklund stated he understood PUD's allowed for some level of flexibility. He indicated this was a unique property that was quite isolated. He explained he could support the flexibility for this property because the next door neighbors would not be impacted by the proposed activity. Chair Weber discussed the zoning code amendment noting the applicant was requesting an event center to be allowed within the B-2 zoning district as well as allowing for one parking space per three seats within the event center. Commissioner Erler stated he was confused about the relationship between the restaurant and the event center. Senior Planner Fransen discussed how the restaurant use would be able to attain a liquor license that could be utilized for the service of alcohol on the entire premises. Chair Weber questioned if the Commission supported the proposed parking. Commissioner Bjorklund supported the parking being changed to one parking space per four seats. He indicated this was the regulation followed by some neighboring communities. Commissioner Stromberg explained she supported the one to four ratio as well, noting many of the visitors may use Lyft or Uber for transportation. Commissioner Mitchell suggested the changes regarding parking be addressed or revisited through the code review study. She recommended the ratio remain three to one for consistency purposes at this time. After further discussion, the consensus of the Commission was to allow for one parking space per four seats within the event center. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 17 Senior Planner Fransen stated the property would then be required to have 133 parking spaces for the Phase I and Phase II uses. Chair Weber moved and Commissioner Erler seconded a motion to recommend approval of Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit, based on the findings of fact and submitted materials, with an amendment to the minimum off-street parking requirement for event centers to allow for one parking stall per four seats. The motion carried unanimously (6-0). Chair Weber requested the Commission now address the requested flexibilities for this Planning Case. Commissioner Erler asked if the applicant had a sample of the proposed metal building material. Mr. Vanney reviewed a material boards with the Commission. Chair Weber asked if the restaurant should be required to have outdoor seating. He was of the opinion this property was not conducive to outdoor seating. Commissioner Erler agreed, stating he did not believe the City should require a restaurant to have outdoor seating. He explained benches outside the event center would be a nice addition. Senior Planner Fransen suggested Condition 18 could read: Benches shall be located near the primary entrance of the building. Chair Weber requested the Commission address the proposed landscaping. He was of the opinion the property should have curb on the parking lot islands. He anticipated this would be addressed through the stormwater management plan. Commissioner Erler agreed curb should be added within the parking lot. He stated he could do without the trees within the parking lot islands. He supported the islands having lights instead of trees for safety purposes. Commissioner Mitchell stated she could support this. She noted that while the plan has fewer trees, there were more other types of plantings. Senior Planner Fransen recommended Condition 19 read: Applicant shall provide concrete curbs for planting islands. Chair Weber asked if the Commission supported the refacing of the sign. The Commission supported the existing monument sign being refaced. The Commission recommended the wall mounted signs be further addressed through the sign code review. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 18 Community Development Director Jagoe suggested Condition 13 be amended to read: As approved in the Master PUD, any future signage not shown as part of the project shall conform to current sign ordinances. The Commission opted to support the proposed graphic signs as shown in the provided plans. Chair Weber inquired if the Commission would like to require additional screening on the site. Commissioner Erler believed that additional permanent screening should be required. Commissioner Stromberg recommended additional screening be proposed. Senior Planner Fransen suggested Condition 20 read: Ground mounted mechanical screening shall conform with City Code requirements. Chair Weber asked how the Commission wanted to address the hours of operation. He stated 3:00 a.m. was a hard no for him. Ms. Kukwa explained cleaning and closing would occur up until 3:00 a.m. and visitors would leave at 2:00 a.m. at bar close. Chair Weber indicated Flaherty's closes at midnight and he believed this was a good precedent for him. Commissioner Erler asked if City Code addressed hours of operation for event centers. Senior Planner Fransen stated City Code does not have established hours of operation for businesses, rather the City follows State law for establishments with a liquor license. Commissioner Mitchell asked what Chair Weber's concerns were. She indicated this was an isolated site that would not impact neighboring properties. She reported this was an event center that would host weddings or other social events. She did not support putting rules more restrictive than Minnesota rules on an event center that may not begin hosting an event until 8:00 p.m. She stated she supported the owner being allowed to set the hours for her events noting the bar would be shut down at 2:00 a.m. Commissioner Erler reported he could support events ending at 2:00 a.m. with staff leaving at 3:00 a.m. Commissioner Stromberg and Commissioner Blilie agreed. Commissioner Bjorklund stated he believed it was reasonable to close the event center at midnight, just like Flaherty's. Senior Planner Fransen suggested Condition 21 read: Event Center and alcohol service will cease at 2:00 a.m. and staff can remain onsite until 3:00 a.m. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 19 Community Development Director Jagoe reported the caterer or the applicant would have to have a 2:00 a.m. liquor license in order to serve liquor until 2:00 a.m. Commissioner Mitchell suggested the language for Condition 21 read: Operations on the subject property will cease at 2:00 a.m. and staff can remain onsite until 3:00 a.m. Further discussion ensued regarding the relationship between the restaurant and the event center. Commissioner Erler stated he was unclear about the relationship between the event center and the restaurant, and how alcohol service would be managed. Chair Weber reported the restaurant would be created and would have a liquor license for the property. However, this did not mean the restaurant and the event center would have the same operating hours. Senior Planner Fransen explained the restaurant would be operational when events are taking place within the event center. She indicated the restaurant could still be open if a caterer was brought onsite for an event. She commented the restaurant could hold a City liquor license and this license would serve the premises. She reported the previous Northern Lights Bingo Hall restaurant, Brightside Cafe, had a liquor license and had served alcohol on the premises. Commissioner Bjorklund stated he was concerned about law enforcement and how many people would be driving drunk out of this property. Ms. Kukwa discussed the current alcohol service laws per the State of Minnesota. She reported alcohol service had to stop at 2:00 a.m. and noted the site would remain open to guests until 3:00 a.m. Chair Weber stated the Commission supported ending at 2:00 a.m. Commissioner Erler moved and Commissioner Mitchell seconded a motion to recommend approval of Planning Case 24-014 for a Master Planned Unit Development, Final Planned Unit Development for Phases 1 and 2, Conditional Use Permit and Site Plan Review for an Event Center and Restaurant at 3776 Connelly Avenue based on the findings of fact and submitted plans as amended by the conditions in the July 10, 2024 report to the Planning Commission along with the additional conditions as discussed: Condition 18 - The Applicant shall provide benches near the primary entrance of the building; Condition 19 - The Applicant shall be required to install curbing around parking islands with parking lot improvements; Condition 20 - Screening for ground -mounted mechanical equipment shall meet the requirements of the Zoning Code; and Condition 21 - The Applicant shall be required to cease hours of operation at 2 AM for commercial land uses approved as part of the PUD. Commissioner Bjorklund stated could hear the outside activities from Flaherty's from his residence and it was disturbing to him. He anticipated the proposed use would cause additional disturbances for his neighborhood and noted he would be voting against this request. ARDEN HILLS PLANNING COMMISSION — July 10, 2024 20 The motion carried 5-1 (Commissioner Bjorklund opposed). UNFINISHED AND NEW BUSINESS None. REPORTS A. Report from the City Council Councilmember Rousseau provided the Commission with an update from the City Council. She invited the Commission members to attend the commission picnic on Tuesday, July 16. B. Planning Commission Comments and Requests Commissioner Bjorklund stated the Commission had talked in the past about the lack of affordable housing in the City and what to do about it. He wanted to see this topic on a Planning Commission worksession agenda in the future for further discussion. He supported the City allowing ADU's in residential neighborhoods. Community Development Director Jagoe indicated staff was waiting for direction from the City Council before moving this item forward. The Commission requested Councilmember Rousseau speak with the City Council regarding ADU's. A Tl_T(1T TR N Commissioner Mitchell moved, seconded by Commissioner Blilie, to adjourn the July 10, 2024, Planning Commission Meeting at 10:54 p.m. The motion carried unanimously (6-0). Proposed Use This development includes a request to allow the use of an Event Center in the B-2 General Business Zoning District, to serve alcohol and food through a State licensed caterer of liquor and food, and for renovations to the exterior of the building. Proposed uses include event center and restaurant. 2 Overview • Redevelopment of a 2.19-acre site. • Property is currently owned by Standout Properties, LLC • Parcel zoning - B-2, Service Business District • 2040 Comprehensive Plan —Community Mixed Use (CMU) • Future Land Use designation is for a broad range of retail, shopping, services, and office space to meet the needs of the community and surrounding areas. This area may also include medium to high density housing with a potential density of 3 to 20 units per acre. irection RR — Railroad right-of-way/ 1/0 — Light Industrial and Office CMU — Community Mixed Use CMU — Community Mixed Use VLDR — Very Low Density Residential qmrmp Railroad/ I -Flex B-2 — General Business B-2 —General Business R-1— Single Family Residential . QQMW_ Railroad/ Industrial Warehouse Parking Lot/ Fast Food Restaurant Parking Lot/Industrial Warehouse Single Family Residences Required Approvals • Zoning Code Amendment • Event Center • Planned Unit Development • Phased Development • Phases I and 11 • Conditional Use Permit • Site Plan Review Zoning Code Text Amendments • Applicant proposing text amendments that would define an Event Center and designate this type of land use as a conditional use in the B-2 General Business District. • According to the Applicant, the proposed ordinance amendment: • will support the growth and diversification of the local economy while meeting the evolving needs of the community • event centers have become increasingly popular as venues for various social and corporate events • by allowing for these dedicated facilities would enhance the city's attractiveness as a destination for such gatherings • Applicant proposed Off Street Parking Spaces Required for an Event Center use, specifying 1 space for every 3 seats as the required number of spaces. • At July 10, 2024 meeting, Planning Commission recommended an amendment to the requirement, specifying 1 space for every 4 seats. Overview of Ordinance Amendments • Staff has prepared text amendments based on the Applicant's narrative as well as a few other criteria suggested by Staff (based on a survey of neighboring communities) for "Event Center" language within Sections • 1305.04 Definitions; • 1320.05 Land Use Chart; • 1320.085 Special Requirements for the B-2 General Business District; and • 1325.06 Requirements for Parking, Loading and Circulation. Applicant's Narrative: 1) Add Event Center as a use permitted by a conditional use permit in the B-2 Zoning District in Section 1320.05 Land Use Chart. 2) Establish parking requirements for event centers at 1 parking space per 3 seats at design capacity in Section 1325.06 Requirements for Parking, Loading and Circulation. Overview of Ordinance Amendments Additional Code Amendments to consider: SF Add a definition for Event Center within Section 1305.04 Definitions a. Event Center: An establishment which is rented by individuals or groups to host scheduled private events including but not limited to weddings, cultural celebrations, corporate functions, and banquets. Such use may or may not include 1) kitchen facilities for the preparation or catering of food; 2) the sale of alcoholic beverages for on -premises consumption only during scheduled events and not open to the general public; and 3) outdoor gardens, patios or outdoor gathering areas. 4) Amend Section 1320.085 Special Requirements for the B-2 General Business District a. Create a new Subdivision 6 — Event Center Additional Conditional Use Permit Criteria that establishes the requirements and criteria for a conditional use permit for Event Center as a conditional use in the B-2 District. A. In addition to meeting the requirements of Section 1325 and 1355.04 Subd 4, event centers shall conform to the following: 1. The occupancy of the building must never exceed the occupancy load posted based on the Fire Marshal's determination. 2. The serving of alcohol shall be subject to Minnesota State Statute and Chapter 5 - Alcoholic Bevera es of the Arden Hills City Co e requirements and is permitted onIV in conjunction with a private event that is not open tot e public. 3. Licensing information from the RarnseV County Sheriff's Office may be requested by City. City could at its discretion request licensing in ormation rom the County S eri s Office. 4. A security plan shall be submitted and approved by the City; 5. A noise mitigation strategy shall be submitted and approved by the City. B. In addition to meeting the requirements of Section 1325 and 1355.04 Subd 4, the City may: 1. Prohibit access from a predominantly residential street; — — I I 2. Restrict the hours of operation for loading docks; Other Considerations: I Zoning Districts; 3. Require greater than minimum setbacks for structures and driveways; Permitted hours of operation in the ordinance; 4. Require opaque screening to eliminate headlight glare; Permitted maximum occupancy in the ordinance; and 5. Impose any other restriction it deems to be in the public interest. Specifying if outdoor space is permitted for an event center and if there would be additional requirements_ - - Overview of Proposal • Designed Site Capacity of 567 people • Capped Capacity of 508 people • Redevelopment —"Elegant Event Center & Cafe" • Improvements • Exterior finishes of the structure • Parking Lot • Landscaping AOE - i i i �n I I I � � I Proposed Site Plan Proposed Rendering Overview of Proposal • Phase I — Event Center • Scheduled from application approval through December 2024 • Hours of Operation — Sunday through Thursday, 8:00 a.m. to 11:59 p.m. • Friday and Saturday 8:00 a.m. to 3:00 a.m. Alcohol service until 2:00 a.m. • Working with caterers • Seating Capacity— 450 guests • Plans for security and noise control EFT1 F-Mi 4$ El 1 - 4H, o 0 0 '�-d` `�-d' 0 v c wx wl �—ax � ien,doomr� Interior Event Center Floor Plan Overview of Proposal • Phase II — Restaurant • Scheduled for immediately after Phase I/ after a city liquor license is obtained • Would continue to work with caterers as warranted • Hours of Operation — Monday through Thursday 11:00 a.m. to 11:59 p.m. • Friday and Saturday 8:00 a.m. to 3:00 a.m. • Kitchen services would end at 11:59 p.m. and liquor service would end at 2:00 a.m. • Sunday 8:00 a.m. to 11:59 p.m. • Seating Capacity — 34 people • Restaurant will be operational during Event Center events J 0AR STORAGE _. 0 +++ BAR -MFl E EXISTING TOILET GL0.5ET Room 5 HALLWAY RESTAURANT 2 10l EXISTING N EN'$TQILET EXISTING ROOM 1-3 }yONEN'S TOILET ROOM LARCH EN 11A 1E FF&PRINKLE m, q'III�IIIIIIII P-MIN"= cr,yH1551c� G,µ:l Apf�': nL li'6 I JJI Interior Restaurant Floor Plan Overview of Proposal • Phase III — Adult Day Care • Scheduled for August 2025 following the modification of an existing DHS Home and Community -Based Services license • Hours of Operation —8:00 a.m. to 4:00 p.m., Monday through Thursday • Occupancy — 20 service participants, 4 staff • Adult Day Care would not be operational during Event Center events (use same space) Al. �j/yam _ j((}!l MIP S TRXB�IR�E'OeFOBMN6 RN NrII4 WlIL1. �VV r LM _ OJ 0 eESnxc FOR aou-0nwae 0 �XX 9i S��R IEIBERB. 0 0 :..;.� El .VX1RE/GXEtM�k4E Interior Future Adult Daycare Floor Plan Design Standards Exterior Materials — Flexibility Requested • At least 75% must be a combination of brick, masonry, tile masonry, natural stone ore equivalent,, transparent lass. q gl ass. • Proposed — • Building elevations consist of brick veneer, transparent glass, metal panels, and wood. • Request for the brick veneer to be considered preferred materials. Event Center Required Preferred Materials Proposed Preferred Materials Other Materials Required Transparency Proposed Transparency *first 12' of elevation Building North Facade 75% 100% 0% N/A 0% East Fa °ade 75% 96% 4% 50% 14% South Fa ade 75% 63% 37% 50% 4% West Fa(ade 75% 95% 5% 1 N/A 0% Renderings of South and North Elevations —Event Center _-_---- =-_ =====______ _ =--=-=-=== -===-= =- - ___ _____ ____ ____--------------------- - ' _ _ ___ _ ___ _ __ _ _ _ __ __ _-___�_ =__ =�= IE m mmi .___-- I� i________ Mi .__________________ nW"��AMM-eves SRC rrioxm exr EIi eievnnon-�oeer g• . t•P d Request • flexibility on South Fagade • - to existing- :■i r=---= ___ ____=_ __-_=�_-_---=_----= `=_ __ _gym � _ __� � � �� Renderings of and West Elevations Event Center East and West Elevations Event Center n Design Standards Event Center Required Transparency Proposed Transparency Building North Fa(ade N/A 0% East Fa(ade 50% 14% South Fa(ade 50% 4% West Fa(ade N/A 0% ___ _ _ __-m - ____ _ _ __ --------------------- �--_____ CY �'�___________ Renderin ss of South and East Elevations Event Center _______________________________ --------------- -------------- ___ Transparency — Flexibility Requested • 50% of all first level building fagades that front a public street shall be comprised of transparent windows or doors in order to allow views of interior uses and activities. • Proposed — • Request for flexibility on south and east fagades due to nature of the existing structure. • Applicant references the construction of the structure and the functions of an Event Center. Notes that the existing transparency shall be maintained. C/C piar .:�,J vy q�n Design Standards JO + 927.9 I + �3.5� BIO9 Height 73.2 X929, IX 926.9 9A9,0 {�r K 9295 � \ X 929.5 529.6 ❑ K 929. t \ X 92� t X 92H.9 G 927.1 � Edge °f �ilurn nn��(�{ 927.2) ~ X 9c:'._ ------ CCe Y. 927. I 1 Building Positioning —Nonconforming N �y 4027 � Existing Site Survey • Section 1325.05 Subd. 8, E - 50% of the largest building on each site shall be constructed at the front setback line. • B-2 District Front Setback —50feet • Existing Building Front Setback — 48.8 feet • Changes are not proposed to the existing setback, setback would be maintained. W g ass Cnnrrel1.. 14 Design Standards Lighting — Flexibility Requested e B-2 max height 50'J, proposed shows 20' 'V j T- FC- T.TP7- Lighting Isometric Plans • Any light or combination of lights shall not cast light that exceeds a meter reading of one foot candle on the travel lanes of adjoining public streets or 0.4 foot candles on adjoining residential property. e Plans show a reading of 1.4 foot candles on Connelly Avenue. Design Standards Site Furnishings — Flexibility Requested • 1325.05 Subd. 8, J — Benches and decorative plantings shall be provided near the primary entrance of all buildings on a site. Restaurants shall include a functional outdoor seating area with tables, chairs, plantings and access to the restaurant. • Planning Commission recommended condition #18: • The Applicant shall provide benches near the primary entrance of the building. • Proposed — Plans show a bench at the main entrance. Outdoor seating area is not planned for restaurant. Building use for event center and restaurant is intended to be fully enclosed with exception for designated smoking patio for event center use. Design Standards Screening and Fencing — For Review • Section 1325.05, Subd. 8, K — Trash and recycling equipment, materials, and containers shall be fully enclosed and integrated into the architecture of the buildings. All mechanical equipment, whether roof -mounted or ground -mounted should be integrated into the architecture of the building. It shall be completely screened from the ground -level view of adjacent properties and public streets. Wood screening shall not be permitted. • Planning Commission recommended condition #20: • Screening for ground -mounted mechanical equipment shall meet the requirements of the Zoning Code. • Proposed —Trash enclosure on the north side of the site with materials consistent with the building. Existing fencing to be removed and new landscaping shall act as screening for ground mounted mechanical equipment. • Plans updated to an evergreen shrub to provide year-round screening for the mechanical equipment. (D o � o TRASH EHCLL181AE . FJ 9 TRASH WE8i P, 0, '' ZLZ.l .�, EH tWyun TRk%, ENGLMURC 1M•-1'-0' fy Tallgn VCl09JPE HORn+ Trash enclosure elevations Tr a 10 - 3 Ck 3 r ® Ck +�2 Tf 3 Ck - 3 8 1 d � 3 Ck pT 20 1 13 D EXISTING BUILDING a cn Landscaping screening along west elevation 17 Design Standards Landscaping — Flexibility Requested • Planting Island Areas and Trees • Planning Commission recommended condition #19: • The Applicant shall be required to install curbing around parking islands with parking lot improvements. Proposed Landscaping Plan Ordinance Requirements Landscape Lot Area Trees along ROW on public street frontage Perennials and/or shrubbery Planting Islands Area Planting Island Trees Significant Trees Standards 20% of lot <1 trees 10% of 10% of parking 1 tree per 1 (Total removed - area minimum landscaped area minimum island 10% of existing) minimum area minimum *1/2=52.25 cal in Proposed 23.34% of 0 trees 23.63% of Percentage of 0 trees per 6 61 caliper Development lot area landscaped parking area islands, 3 trees inches area not provided per 1 island Design Standards Off -Street Parking Setbacks — Flexibility Requested City Code requires off-street parking areas to be located a minimum: 20 feet from the right-of-way of any public street 5 feet from side and rear property lines Parking lot improvements: • New pavement in generally the same configuration that exists today • Addition of pavement in the northwest corner Applicant is seeking flexibility to maintain the existing off- street parking setback from the ROW along Connelly Avenue and adjacent to the south property line. Parking lot area would maintain a five (5) foot setback along the remaining three property lines. X �X,E.. ��µ: EEC aE�roeE��a� XXRF X F-r�sr+1+caunoINC l L ' f I I ! n � L---------J j-j ------� L- ---- - JJ Demo Plan 0 0,7. I r o Proposed Site Plan Design Standards Number of Off -Street Parking Spaces — Council Input Requested �_ _ _------ --- -- i �, © s:,'. `. .tam • ,^_�.-•-_ ; :. ',�. © O °® °. LLLwa Q� Proposed Site Plan • Applicant is proposing 145 parking spaces for the site • Event Center at seating for 450 guests • 150 parking spaces required for every 3 seats • does not meet minimum requirement for Phases 1 and 11, flexibility requested • 113 parking spaces required for every 4 seats • meets minimum for Phases 1 and 11 • Resta u rant at 34 seats • 17 parking spaces at 2 seats Design Standards Driveways - Recommended Condition IIII r-1 1 �q o r„- a LLir a Proposed Site Plan • Per City Code, the minimum and maximum driveway widths for commercial properties are 22 feet and 32 feet on City streets, respectively. Access drives may be placed adjacent to property lines but in no case shall a driveway be placed nearer than 5 feet to an existing drive on an abutting property. • Applicant is proposing to utilize the existing driveway access with frontage on Connelly Avenue. • Site survey does not include the dimensions of the existing driveway. • A portion of the Subject Property's driveway access is located on the property to the south which is owned by Flaherty's. • Based on the current information, staff recommends the addition of Condition 22: • The Applicant shall be required for parking lot improvements to relocate the driveway access including curbing so that it is entirely located within the non -vacated portion of Connelly Avenue in a manner compliant with city codes. Design Standards Pedestrian and Bicycle Circulation — For Review • Applicant has stated there is not an existing public sidewalk or trail network for an internal sidewalk system to link to adjacent to the Subject Property. • Section 1325.05 Subd, 8, Q —1 bicycle space for every 20 parking spaces. • Proposed — 7 bicycle parking spaces near the main entrance. --_�T TN l EXISTING BUILDING Pedestrian Circulation Plan Bike Rack Location (highlighted) 22 Design Standards Freestanding Signs — Nonconforming, Flexibility Requested • Sign District 7 requirements: • Up to 25 square feet in copy area • Max 8' in height • Total area of sign cannot exceed 1.5 times permitted sign copy area • External Illumination only • Existing freestanding sign on the west side of the property: • 40 square feet in copy area • 16 feet in height • Internal Illumination • Proposed freestanding sign (refacing existing): • 23.2 square feet in copy area • 16 feet in height • 40.4 square feet total sign area (34.8 permitted) • Internal Illumination w L W W" NoRTFieRN L��HTg IRIA��•_ Existing Freestanding Sign r-arra� - TGULAREA, OF WOW FRMOTALNGING MU WON: IOASF ►AI.oHVbLE AREA I I ,�dl +,s�l�A'�►.e MN " T�- T41A4CGP7AAEA t328F A i eWOR E AREA 25 8F { FREESTANDING POLE SIGN ELEVATION Proposed Freestanding Sign Design Standards Wall Signs — Meets Requirements • Sign District 7 requirements: • Up to 45 square feet in copy area • Internal or External Illumination • Proposed wall signage r1 EAST BUILIN DG ELEVATION 118" = 1'-0" • 2 internally illuminated wall signs for a total square footage of 44.7 square feet, both located on the east elevation. East Elevation with proposed signage TOTAL SIGN C4Z> ; AREA: 11.49 P (.1) ALLOWABLE AREA 4S n WALL SIGN ELEVATION - EVENT CENTER ENTRANCE (EAST) (1) tD (1) (1) (D Cb (h ARCHITECTURAL FEATURE USING ACCENT METAL - COLOR TBD. AREA 33.21 SF= ALLOWABLEAREA: rl WALL V_OV ELEVATION -EAST Proposed signage for East Elevation 24 8-2 District — Summary Analysis Ordinance Require Otaodards pment `.la_-imum Fiocr Area Ratio 0.8 0.17 .%-Jaximum LuUmg Height 50 feet 20 feet 11 ?'8" — - Maximtm mwt a m-era-za 45 % 17% h inimum Land e Lot Area 20% 2334% Mm mum Front Yard Setback 50 feet 48_8 fleet ,lnimum Rear Ywd Setback 20 feet +!- 160 fret "_lAnmum Side Yard SetbacF 10 feet (min).-20 fleet (total) 19_5 feet- +r'-14D fleet Buildiniz Pmdtioning 50 feet 48_8 feet Tiinimum Parking Requirements Rurant: 1 space per seats 145 spaces Event Center: 1 space per 4 seats used upon PC Recommendation ('Total Required- 130 spaces) Off -Street Parking Setbacks 20 feet from ROIAT Seelig Flexibility 5 feet ffomr sidehear Wpertv lines 3uUmg Fa ade Transparency 50 }U t=,parency at front Se&ing Flembility Building Matehals 7 j% brick tile, natural stone, Seeking Flexibility decorative concrete, transparent lass or mv combination thereof Libting Not to exceed one foot candle on Seeking Flexibility, IA foot candles the travel lanes of adjoining public down on photometric plan streets Scre--miv Fencmg Trash to be enclosed, equipment to Trash enclosure proposed, be screened landscaping for screenine Site Furnishings Benches and decorative plantings, Bench added at main entry, seelang restaurants iiith outdoor seadtmg flexibility with outdoor seating area area Landscaping — Perenmal/Shrubs Planting Islmdrequirements for Applicant intends to winph curbing Landscaping — Tree Mitigation 51_75 caliper inches required for 61 caliper inches proposed for replacement replacement Landscaping — Boulenard and BouleTard Trees — <1 Boule-L•ard Trees — D Island Trees Island. Trees — ? Island Trees — 3 Pedestrian and Bicycle Circulation Fronde circulation plan and bike Bike Rack and plan rack Freestanding Signage — Total Sign 34.8 square fleet Seeking Flexibility, 40A square feet Area Wall Si age 45 square feet 44_7- square fleet 25 Additional Reviews Building Official The Building Official has reviewed the plans and has no additional comments at this time. A Building Permit will be required prior to any construction taking place. Public Works Director/City Engineer The Public Works Director/City Engineer has reviewed the plans. The following comments have been provided: • Applicant shall apply for a City Grading and Erosion Control permit and submit the total area of reconstructed surface. • Applicant shall contact Rice Creek Watershed District to verify if a watershed permit is needed. • The City has received complaints of vehicle traffic that exits this property. The complaint is vehicles do not stop or yield while existing which causes issues with traffic on Connelly Avenue. Fire Marshal The Fire Marshal is currently reviewing the plans. No additional conditions have been included at this time. Public Notice • Notice was published in the Pioneer Press on July 12, 2024. Notice was prepared by the City and mailed to property owners within 1,000 feet of the subject property. • The City has not received any public comments regarding this case. -AF�EN HILLS 27 Questions? Planning Case 24-014 — Elegant Event Center lt -ADI�EN HILLS NEW BUSINESS -11A 'It �-`iIQEN�HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Jessica Jagoe, Community Development Director SUBJECT: Planning Case #24-009 — Public Hearing Required Applicant: Lake Johanna Fire Department Property Location: 3535 Pine Tree Drive Request: Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit and Site Plan Review Council Should Consider: Motions to approve, table, or deny the following: • Planning Case 24-009 and the adoption of Resolution 2024-037 for the Lake Johanna Fire Department Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review for a proposed project on 3535 Pine Tree Drive to allow for the construction of a 41,000 square foot Headquarters Fire Station facility that will house administrative staff as well as a response crew and includes training facilities for the Department. Approval of a PUD requires an affirmative vote offour councilmembers. Background 1. Overview of Request The Applicant has submitted a land use application for Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review, proposing to develop a 3.7-acre site located at 3535 Pine Tree Drive. The Subject Property is currently owned by the Applicant. The Applicant is proposing to build a two-story fire station Headquarters facility of approximately 41,000 square feet with a training facility and training tower. The Lake Johanna Fire Department provides public fire and medical emergency response services to the Cities of Arden Hills, North Oaks, and Shoreview. The Applicant currently operates out of three stations, the proposed project would replace Station 4 located at 3615 Victoria Street in Shoreview and become the Headquarters for the Department. The Applicant is planning for construction of the new Headquarters facility to begin in 2025. Page 1 of 5 The Headquarters Fire Station facility will consists of offices for five (5) full time staff members that would maintain typical Monday through Friday 8 to 5 business hours. The fire station will have a crew of three (3) Firefighters on duty 24/7 to respond to fire and emergency medical service (EMS) calls. Requested Action 1. Planned Unit Development A Planned Unit Development (PUD) is required for all new development and redevelopment in the B-2 Zoning District. In addition, a PUD would allow for performance standard flexibility. This proposal involves both the initial Master Plan PUD and the Final PUD. Architectural Plan 2. Conditional Use Permit In the B-2 Zoning District, a Conditional Use Permit (CUP) is required for Public Use. The Cities of Arden Hills, North Oaks, and Shoreview contract with the Lake Johanna Fire Department to provide emergency response services for Fire and EMS calls to the public. The City refers to the Lake Johanna Fire Department in the 2040 Comprehensive Plan under Chapter 13, Public Facilities, Services, and Infrastructure. A conditional use is allowed if the landowner meets the general and specific standards set forth in the zoning ordinance. City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a Conditional Use Permit. The City Council should consider the effect of the proposed use upon the health, safety, convenience and general welfare of the owners and occupants of the surrounding land and the community, in general, including but not limited to the following factors: 1. Existing and anticipated traffic and parking conditions; 2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, and other nuisance characteristics; 3. Drainage; 4. Population density; 5. Visual and land use compatibility with uses and structures on surrounding land; 6. Adjoining land values; 7. Park dedications where applicable; 8. Orderly development of the neighborhood and the City within the general purpose and intent of the Zoning Code and the Comprehensive Development Plan for the City. Findings of Fact Page 2 of 5 The Planning Commission reviewed this application at their July 10, 2024 meeting and have offered the following findings of fact for your consideration: 1. The property located at 3535 Pine Tree Drive is designated for Community Mixed Use on the 2040 Comprehensive Plan. 2. New building construction or site modification identified requires the submittal of a Site Plan Review application prior to construction. 3. For proposals for new construction, redevelopment of a site, and significant modifications to existing sites a PUD is required. 4. The PUD process allows for flexibility within the City's regulations through a negotiated process with an Applicant. 5. The Applicant has proposed a Master and Final Planned Unit Development for the development of a 41,000 square foot Headquarters Fire Station facility on the Subject Property. 6. The Subject Property is zoned B-2 General Business District which requires a Conditional Use Permit for Public Use. 7. The Cities of Arden Hills, North Oaks, and Shoreview contract with the Lake Johanna Fire Department to provide emergency response services for Fire and EMS calls to the public. The City refers to the Lake Johanna Fire Department in the 2040 Comprehensive Plan under Chapter 13, Public Facilities, Services, and Infrastructure 8. The Master and Final Planned Unit Development generally conforms to the requirements of the City Zoning Code and design standards. 9. Where the plan is not in conformance with the City Code, flexibility has been requested by the Applicant. 10. Flexibility through the PUD process has been requested in the following areas: building positioning, transparency, and landscaping. 11. A public hearing for a Master Planned Unit Development, Final Planned Unit Development, and Conditional Use Permit request is required before the request can be brought before the City Council. 12. The Planning Commission held the required public hearing on July 10, 2024. Options and Motion Language The Planning Commission reviewed this application at their July 10, 2024 meeting. At that time they recommended approval with conditions of the Lake Johanna Fire Department application for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review by a 6-0 vote. The Planning Commission added Conditions 18, 19, and 20 to address the comments of the PW/Engineering Division, tree mitigation plans, and Public Use/Park Dedication fees for the plat. The following are motion language options for the City Council to consider. • Approval with Conditions: Motion to approve Resolution 2024-037 and Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, based on the findings of fact and the submitted plans, as amended by the conditions in the July 22, 2024 Report to the City Council: 1. The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the Community Development Director, shall require review and approval by the Planning Commission and City Council. Page 3 of 5 2. The Master and Final Planned Unit Development approval shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by the City Council. The City Council may extend the expiration date of such approval upon written application by the person to whom the approval was granted. 3. A violation of any condition set forth in the permit shall be a violation of this Code, and shall be cause for revocation of the permit. 4. A Master and Final PUD Development Agreement shall be prepared by the City Attorney and subject to City Council approval for the Development. The Master and Final PUD Development Agreement shall be fully executed prior to the issuance of building permits. 5. A Grading and Erosion permit shall be obtained from the City's Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including but not limited to Rice Creek Watershed District prior to the start of any site activities. 6. The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit. 7. Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and Community Development Director prior to the issuance of a grading and erosion control permit or other development permits. 8. Upon completion of grading and utility work on the site, a grading as -built and utility as - built shall be provided to the City for review. 9. Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site. 10. The Applicant shall be responsible for protecting the proposed on -site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant. 11. All light poles, including base, shall be a maximum of 30 feet in height and shall be shoebox style, downward directed, with high-pressure sodium lamps or LED and flush lenses. 12. All rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. 13. A separate sign permit shall be required for all signs on the site. 14. The Applicant shall be financially responsible for all applicable water and sanitary charges. Rates applied shall be memorialized in the Development Agreement. 15. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shall mow and maintain all site boulevards to the curb line of the public streets. 16. The proposed structures shall conform to all other regulations in the City Code. 17. The Applicant shall provide a copy of the Stormwater Management Report and verification of Rice Creek Watershed approval prior to the approval of Development Agreement. 18. All items identified in the June 27, 2024 PW/Engineering Division memo shall be addressed. All comments shall be adopted herein by reference. 19. The Applicant shall follow city code accordingly for tree mitigation of 300 caliper inches. 20. The Public Use Dedication/Park Dedication fee shall be waived for future development of Lot 2, Block 1 of the 2 Pine Tree North plat. Page 4 of 5 • Approval as Submitted: Motion to approve Resolution 2024-037 and Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, based on the findings of fact and the submitted plans in the July 22, 2024 Report to the City Council. Denial: Motion to deny Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, based on the following findings: findings to deny should specifically reference the reasons for denial and why those reasons cannot be mitigated. • Table: Motion to table Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive: a specific reason and information request should be included with a motion to table. Deadline for Agency Actions The City of Arden Hills received the completed application for this request on June 13, 2024. Pursuant to Minnesota State Statute, the City must act on this request by August 11, 2024 (60 days), unless the City provides the petitioner with written reasons for an additional 60-day review period. With consent of the applicant, the City may extend the review period beyond the initial 120 days. Attachments A. Resolution 2024-037 B. City Council Presentation Page 5 of 5 I't EN HILL, CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO.2024-037 RESOLUTION APPROVING A CONDITIONAL USE PERMIT FOR THE SUBJECT PROPERTY AT 3535 PINE TREE DR WHEREAS, City Staff received a complete land use application for 3535 Pine Tree Drive. ("Subject Property") as part of a Final Planned Unit Development for a Conditional Use Permit on June 13, 2024; WHEREAS, the Subject Property is located in the B-2 — General Business Zoning District and is guided as Community Mixed Use in the Land Use plan; WHEREAS, a Conditional Use Permit is required for a public use in the B-2 Zoning District; WHEREAS, the Applicant has requested as part of the Final Planned Unit Development a Conditional Use Permit in order to allow for a fire station headquarters facility; WHEREAS, the City Council directed Staff to prepare a Land Use Application Public Policy Notification to notify all property owners within 1000 feet of Subject Property when a request for the Planning Commission is to occur related to a land use application that requires a public hearing; WHEREAS, the City's obligation has been met where the Arden Hills Planning Commission duly held a public hearing on July 10, 2024. All persons present at said meeting were given an opportunity to be heard and present written statements; and WHEREAS the Planning Commission considered the Applicant's request for a Conditional Use Permit and, as such voted 6-0 in favor of recommending approval with conditions. NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF ARDEN HILLS: Hereby adopts Resolution 2024-037 approving Planning Case 24-009 for a Final Planned Unit Development with a Conditional Use Permit at the Subject Property 3535 Pine Tree Dr. to allow a fire station headquarters facility. To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. I BE IT FURTHER RESOLVED that City Council approves Planning Case 24-009 for a Final Planned Unit Development with a Conditional Use Permit on the Subject Property 3535 Pine Tree Dr., based on the findings of fact and the submitted plans in the July 22, 2024 Report to the City Council, as amended by the following conditions: 1. The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the Community Development Director, shall require review and approval by the Planning Commission and City Council. 2. The Master and Final Planned Unit Development approval shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by the City Council. The City Council may extend the expiration date of such approval upon written application by the person to whom the approval was granted. 3. A violation of any condition set forth in the permit shall be a violation of this Code, and shall be cause for revocation of the permit. 4. A Master and Final PUD Development Agreement shall be prepared by the City Attorney and subject to City Council approval for the Development. The Master and Final PUD Development Agreement shall be fully executed prior to the issuance of building permits. 5. A Grading and Erosion permit shall be obtained from the City's Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including but not limited to Rice Creek Watershed District prior to the start of any site activities. 6. The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit. 7. Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and Community Development Director prior to the issuance of a grading and erosion control permit or other development permits. 8. Upon completion of grading and utility work on the site, a grading as -built and utility as - built shall be provided to the City for review. 9. Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site. 10. The Applicant shall be responsible for protecting the proposed on -site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant. 11. All light poles, including base, shall be a maximum of 30 feet in height and shall be shoebox style, downward directed, with high-pressure sodium lamps or LED and flush lenses. 12. All rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. 13. A separate sign permit shall be required for all signs on the site. 14. The Applicant shall be financially responsible for all applicable water and sanitary charges. Rates applied shall be memorialized in the Development Agreement. To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. 2 15. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shall mow and maintain all site boulevards to the curb line of the public streets. 16. The proposed structures shall conform to all other regulations in the City Code. 17. The Applicant shall provide a copy of the Stormwater Management Report and verification of Rice Creek Watershed approval prior to the approval of Development Agreement. 18. All items identified in the June 27, 2024 PW/Engineering Division memo shall be addressed. All comments shall be adopted herein by reference. 19. The Applicant shall follow city code accordingly for tree mitigation of 300 caliper inches. 20. The Public Use Dedication/Park Dedication fee shall be waived for future development of Lot 2, Block 1 of the 2 Pine Tree North plat. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 22" a DAY OF JULY, 2024. David Grant, Mayor ATTEST: Julie Hanson, City Clerk To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. 3 Location Map Planning Case #24-009 — Public Hearing Required Applicant: Lake Johanna Fire Department Property Location: 3535 Pine Tree Dr Request: Master and Final Planned Unit Development, Conditional Use Permit and Site Plan Review 1 Actions to Consider • Planning Case 24-009 and adopt a Resolution 2024-037 for the Lake Johanna Fire Department Master Planned Unit Development, Final Planned Unit Development, Conditional Use permit, and Site Plan Review on 3535 Pine Tree Dr. allow for the construction of a 41,000 square foot Headquarters Fire Station facility that will house administrative staff as well as a response crew and includes training facilities for the Department. Findings of Fact 1. The property located at 3535 Pine Tree Drive is designated for Community Mixed Use on the 2040 Comprehensive Plan. 2. New building construction or site modification identified requires the submittal of a Site Plan Review application prior to construction. 3. For proposals for new construction, redevelopment of a site, and significant modifications to existing sites a PUD is required. 4. The PUD process allows for flexibility within the City's regulations through a negotiated process with an Applicant. 5. The Applicant has proposed a Master and Final Planned Unit Development for the development of a 41,000 square foot Headquarters Fire Station facility on the Subject Property. 6. The Subject Property is zoned B-2 General Business District which requires a Conditional Use Permit for Public Use. 7. The Cities of Arden Hills, North Oaks, and Shoreview contract with the Lake Johanna Fire Department to provide emergency response services for Fire and EMS calls to the public. The City refers to the Lake Johanna Fire Department in the 2040 Comprehensive Plan under Chapter 13, Public Facilities, Services, and Infrastructure 8. The Master and Final Planned Unit Development generally conforms to the requirements of the City Zoning Code and design standards. 9. Where the plan is not in conformance with the City Code, flexibility has been requested by the Applicant. 10. Flexibility through the PUD process has been requested in the following areas: building positioning, transparency, and landscaping. 11. A public hearing for a Master Planned Unit Development, Final Planned Unit Development, and Conditional Use Permit request is required before the request can be brought before the City Council. 12. The Planning Commission held the required public hearing on July 10, 2024. Deadline for Agency Action • The City of Arden Hills received the completed application for this request on June 13, 2024. Pursuant to Minnesota State Statute, the City must act on this request by August 11, 2024 (60 days), unless the City provides the petitioner with written reasons for an additional 60-day review period. With consent of the applicant, the City may extend the review period beyond the initial 120 days. 'it -ARpEN HILLS �q Planning Commission Review Planning Commission reviewed this application at the July 10, 2024 meeting. Commission voted 6-0 to recommend approval with 20 conditions of Planning Case 24-009. Additional recommended conditions were: • All items identified in the June 27, 2024 PW/Engineering Division memo shall be addressed. All comments shall be adopted herein by reference. • The Applicant shall follow city code accordingly for tree mitigation of 300 caliper inches. The Public Use Dedication/Park Dedication fee shall be waived for future development of Lot 2, Block 1 of the 2 Pine Tree North plat. "It -ARpEN HILLS Options and Motion Language • Approval with Conditions: Motion to approve Resolution 2024-037 and Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, based on the findings of fact and the submitted plans, as amended by the conditions in the July 22, 2024 Report to the City Council • Approval as Submitted: Motion to approve Resolution 2024-037 and Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, based on the findings of fact and the submitted plans in the July 22, 2024 Report to the City Council. • Denial: Motion to deny Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive, based on the following findings: findings to deny should specifically reference the reasons for denial and why those reasons cannot be mitigated. • Table: Motion to table Planning Case 24-009 for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review at 3535 Pine Tree Drive: a specific reason and information request should be included with a motion to table. - EN HILLS I. PC Recommended Conditions The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the Community Development Director, shall require review and approval by the Planning Commission and City Council. The Master and Final Planned Unit Development approval shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by the City Council. The City Council may extend the expiration date of such approval upon written application by the person to whom the approval was granted. 3. A violation of any condition set forth in the permit shall be a violation of this Code, and shall be cause for revocation of the permit. 4. A Master and Final PUD Development Agreement shall be prepared by the City Attorney and subject to City Council approval for the Development. The Master and Final PUD Development Agreement shall be fully executed prior to the issuance of building permits. 5. A Grading and Erosion permit shall be obtained from the City's Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including but not limited to Rice Creek Watershed District prior to the start of any site activities. The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit. 7. Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and Community Development Director prior to the issuance of a grading and erosion control permit or other development permits. 8. Upon completion of grading and utility work on the site, a grading as -built and utility as -built shall be provided to the City for review. 9. Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site. 10. The Applicant shall be responsible for protecting the proposed on -site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant. I-T-11 -rt�xnis PC Recommended Conditions, contd 11. All light poles, including base, shall be a maximum of 30 feet in height and shall be shoebox style, downward directed, with high-pressure sodium lamps or LED and flush lenses. 12. All rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. 13. A separate sign permit shall be required for all signs on the site. 14. The Applicant shall be financially responsible for all applicable water and sanitary charges. Rates applied shall be memorialized in the Development Agreement. 15. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shall mow and maintain all site boulevards to the curb line of the public streets. 16. The proposed structures shall conform to all other regulations in the City Code. 17. The Applicant shall provide a copy of the Stormwater Management Report and verification of Rice Creek Watershed approval prior to the approval of Development Agreement. 18. All items identified in the June 27, 2024 PW/Engineering Division memo shall be addressed. All comments shall be adopted herein by reference. 19. The Applicant shall follow city code accordingly for tree mitigation of 300 caliper inches. 20. The Public Use Dedication/Park Dedication fee shall be waived for future development of Lot 2, Block 1 of the 2 Pine Tree North plat. AK HILLS Questions? Planning Case 24-009 — Lake Johanna Fire Department lt EN HILLS NEW BUSINESS -11B lt �-REN�HILLS MEMORANDUM DATE: July 22, 2024 TO: Honorable Mayor and City Councilmembers Dave Perrault, City Administrator FROM: Jessica Jagoe, Community Development Director SUBJECT: Planning Case #24-014 — Public Hearing Required Applicant: Rose Kukwa Property Location: 3776 Connelly Avenue Request: Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit and Site Plan Review Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider: Motions to approve, table, or deny the following: • Adoption of Ordinance 2024-007 for Planning Case 24-014 for Zoning Code Amendments to Chapter 13, Section 1305 — Rules, Scope, Interpretation, & Definitions, Section 1320 — District Provisions, and Section 1325 — General Regulations to add language for an event center use in the B-2 General Business District by conditional use permit and authorization to publish a Summary Ordinance of 2024-007 for Planning Case 24-014. • Planning Case 24-014 and the adoption of Resolution 2024-038 for the Elegant Event Center Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review for the proposed project on 3776 Connelly Avenue to allow for the site to be redeveloped as an event center and restaurant. Approval for authorization to publish summary ordinance requires an affirmative vote of four councilmembers. Approval of a PUD requires an affirmative vote of four councilmembers. Background The Applicant has submitted a land use application for a Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review to redevelop the existing approximately 11,000 square foot commercial building on the property at 3776 Connelly Avenue. The Subject Property is currently owned by Standout Page 1 of 7 Properties, LLC and the building is occupied by the Northern Lights Bingo Hall and Bright Side Cafe. The Applicant is proposing to renovate the existing building and resurface the parking lot. The Applicant is proposing a phased development with the event center established in Phase I and restaurant and adult day care uses to be established in Phase II and Phase III, respectively. The Applicant is seeking review and approval for Phases I and II at this time. Approvals 1. Zoning Code Amendment The Applicant is proposing to use the property as an Event Center. Currently, the city code is absent of land use language permitting an Event Center use or establishing standards for the development or operation of an event center within any zoning district. To allow this land use, the City's Zoning Code would need to be amended to add a definition for an Event Center and to designate this type of land use within a zoning district. The proposed Event Center would not be permitted without a zoning code amendment. As part of the land use application, the Applicant has proposed for the use of an event center to be allowed in the B-2 General Business Zoning District through a conditional use permit. The Applicant has stated that the addition of an event center as a conditional use in the B-2 Zoning District aligns with the districts purpose of accommodating commercial activities that serve the local community. The other approvals noted in the land use application would not be applicable unless the Event Center use is permitted within the B-2 General Business Zoning District. 2. Planned Unit Development A Planned Unit Development (PUD) is required for all new development and redevelopment in the B-2 Zoning District. In addition, a PUD would allow for performance standard flexibility. This proposal involves both the initial Master Plan PUD and the Final PUD for Phase I and II. Under the PUD Master Plan, the Applicant shall provide details for each stage of development, but would be required to seek the PUD Final Plan approval of Phase III at the time of establishing the future use of an adult day care. The Applicant has provided details in the Architectural Plans which identifies how the Subject Property would be utilized in Phase I as an event center, Phase II as a restaurant, and Phase III as an adult day care. The City Council should consider the different phases of development while considering the Master and Final PUD as proposed in this application. In this application, the Applicant is seeking approval for Phase I, the event center, and Phase II, which includes the restaurant. The Applicant states in the narrative that Phase II would begin immediately after the completion of Phase I for the event center with the restaurant being operational once a liquor license is obtained. 3. Conditional Use Permit The Applicant is proposing that in the B-2 Zoning District, a Conditional Use Permit is required for an event center. Typical factors to consider in the evaluation of the CUP request may be hours of operation, potential noise from the proposed use, lights from vehicles, and on -site traffic. The Applicant is proposing all events will be held inside the building to contain noise within the venue and their request includes supplementary materials related to a security plan and traffic considerations. Page 2 of 7 City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning Code lists the criteria for evaluating a Conditional Use Permit. The City Council should consider the effect of the proposed use upon the health, safety, convenience and general welfare of the owners and occupants of the surrounding land and the community, in general, including but not limited to the following factors: 1. Existing and anticipated traffic and parking conditions; 2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, and other nuisance characteristics; 3. Drainage; 4. Population density; 5. Visual and land use compatibility with uses and structures on surrounding land; 6. Adjoining land values; 7. Park dedications where applicable; 8. Orderly development of the neighborhood and the City within the general purpose and intent of the Zoning Code and the Comprehensive Development Plan for the City. Findings of Fact The Planning Commission reviewed this application at their July 10, 2024 meeting and have offered the following findings of fact for your consideration: Zoning Code Text Amendment Findings: 1. Rose Kukwa, the Applicant, is proposing amendments to the language of Chapter 13 — Zoning Code of the City Code. 2. Under the City's Zoning Code Section 1305.04, Definitions, the City does not define an event center use. 3. The Applicant is proposing an amendment to define an event center and allow for the use in the B-2 General Business District through a conditional use permit. 4. The Applicant is proposing additional criteria in the ordinance language to establish a minimum parking requirement of 1 parking per 4 seats at design capacity. 5. Of local communities surveyed, the majority allow an event center use through a conditional use permit in at least one commercial zoning district. 6. Amendments to the Zoning Code regulations require a public hearing prior to action by the City Council. 7. The Planning Commission held a public hearing for this land use application on July 10, 2024. Planned Unit Development, Conditional Use Permit and Site Plan Review Findings: 1. The property located at 3776 Connelly Avenue is designated for Community Mixed uses on the 2040 Comprehensive Plan. 2. New building construction or site modification identified requires the submittal of a Site Plan Review application prior to construction. 3. For proposals for new construction, redevelopment of a site, and significant modifications to existing sites a PUD is required. 4. The PUD process allows for flexibility within the City's regulations through a negotiated process with a Developer. 5. The Applicant has proposed a Master and Final Planned Unit Development for the development of one approximate 11,000 square foot event center with additional restaurant and adult day care uses on the Subject Property. Page 3 of 7 6. The Applicant has proposed a phased development plan with Phase I referred to as the event center to be established following the land use approvals herein, Phase II referred to as the restaurant to be established directly following Phase I and for Phase III referred to as the adult day care to be established approximately one (1) year later. 7. The Applicant has proposed for the approval of Phase I for an event center and Phase II for a restaurant as part of the Master PUD and will need to submit for a Final PUD amendment approval for Phase III for the adult day care use. 8. The Master and Final Planned Unit Development generally conforms to the requirements of the City Zoning Code and design standards. 9. Where the plan is not in conformance with the City Code, flexibility has been requested by the Applicant. 10. Flexibility through the PUD process has been requested in the following areas: landscaping for planting island trees, building materials, transparency, signage, lighting, and site furnishings. 11. A public hearing for a Master Planned Unit Development, Final Planned Unit Development, and Conditional Use Permit request is required before the request can be brought before the City Council. 12. The Planning Commission held a public hearing for this land use application on July 10, 2024. Options and Motion Lan2ua2e The Planning Commission reviewed this application at their July 10, 2024 meeting. At that time, they recommended approval with amendments of the Elegant Event Center application for a Zoning Code Amendment by a 6-0 vote. The amendment to the drafted ordinance language decreased the minimum off-street parking space requirement from one (1) parking spaces for every three (3) seats to one (1) parking space to every four (4) seats. The following are motion language options for the City Council to consider. Adoption of Ordinance 2024-007 for Planning Case 24-014 for Zoning Code Amendments to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 • Approval: Motion to a Opt Ordinance 2024-007 for Planning Case 24-014 for Zoning Code Amendments to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit and authorization to publish a Summary Ordinance of 2024-007 for Planning Case 24-014, based on the findings of fact and as presented in the July 22, 2024 Report to the City Council. • Approval with Amendments: Motion to adopt Ordinance 2024-007 for Planning Case 24- 014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit and authorization to publish a Summary Ordinance of 2024-007 for Planning Case 24-014, based on the findings of fact and as presented in the July 22, 2024 Report to the City Council, with amendments: a specific reason should be included with all amendments. • Denial: Motion to deny Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to Page 4 of 7 allow for an Event Center use in the B-2 General Business District through a conditional use permit and authorization to publish a Summary Ordinance of 2024-007 for Planning Case 24-014, based on the following findings: findings to deny should specifically reference the reasons for denial and why those reasons cannot be mitigated. • Table: Motion to table Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit and authorization to publish a Summary Ordinance of 2024-007 for Planning Case 24-014: a specific reason and information request should be included with a motion to table. The Planning Commission recommended approval with conditions of the Elegant Event Center application for a Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review by a 5-1 vote. The Planning Commission added Conditions 18 through 21 that the applicant shall provide benches near the main entrance of the building, shall install curbing around parking islands, shall provide screening for ground -mounted mechanical equipment that meets the requirements of the Zoning Code, and shall be required to cease hours of operations at 2 a.m. for commercial land uses approved as part of the PUD. Following the July 10, 2024 Planning Commission meeting, Condition 22 was added at the recommendation of the City Attorney. The following are motion language options for the City Council to consider. • Approval with Conditions: Motion to approve Resolution 2024-038 and Planning Case 24- 014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an Event Center and Restaurant at 3776 Connelly Avenue, based on the findings of fact and the submitted plans, as amended by the conditions in the July 22, 2024 Report to the City Council: 1. The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the Community Development Director, shall require review and approval by the Planning Commission and City Council. 2. The Master Planned Unit Development and Final Planned Unit Development for Phases I and II shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by the City Council. The City Council may extend the expiration date of such approval upon written application by the person to whom the approval was granted. 3. A violation of any condition set forth in the permit shall be a violation of this Code, and shall be cause for revocation of the permit. 4. A Master and Final PUD Development Agreement shall be prepared by the City Attorney and subject to City Council approval for the Development. The Master and Final PUD Development Agreement shall be fully executed prior to the issuance of building permits. Prior to the issuance of a building permit, a landscape financial security equal to 125% of the cost of the landscaping to be installed on the site shall be submitted. The Applicant must submit a detailed cost estimate for the landscaping so staff can determine the final amount. Landscape financial security shall be held for two full growing seasons. For any landscaping that is not in accordance with the approved landscaping plan at the end of two growing seasons, the Developer shall replace the material to the satisfaction of the City before the guarantee is released. Where this is Page 5 of 7 not done, the City, at its sole discretion, may use the proceeds of the performance guarantee to accomplish performance. 5. A Grading and Erosion permit shall be obtained from the city's Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey County (i.e. ROW or access) prior to the start of any site activities. 6. The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit. 7. Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and Community Development Director prior to the issuance of a grading and erosion control permit or other development permits. 8. Upon completion of grading and utility work on the site, a grading as -built and utility as -built shall be provided to the City for review. 9. Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site. 10. The Applicant shall be responsible for protecting the proposed on -site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant. 11. All light poles, including base, shall be a maximum of 20 feet in height and shall be shoebox style, downward directed, with high-pressure sodium lamps or LED and flush lenses. 12. All rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. 13. A separate sign permit shall be required for all signs on the site. 14. Any future trash and vacuum enclosures shall utilize gates and be constructed on three sides using the same materials and patterns used on the building. Locations shall be approved by the Planning Department. 15. The Applicant shall be financially responsible for all applicable water and sanitary charges. Rates applied shall be memorialized in the Development Agreement. 16. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shall mow and maintain all site boulevards to the curb line of the public streets. 17. The proposed structure shall conform to all other regulations in the City Code. 18. The Applicant shall provide benches near the primary entrance of the building. 19. The Applicant shall be required to install curbing around parking islands with parking lot improvements. 20. Screening for ground -mounted mechanical equipment shall meet the requirements of the Zoning Code. 21. The Applicant shall be required to cease hours of operation at 2 AM for commercial land uses approved as part of the PUD. 22. The Applicant shall be required for parking lot improvements to relocate the driveway access including curbing so that it is entirely located within the non -vacated portion of Connelly Avenue in a manner compliant with city codes. Page 6 of 7 • Approval as Submitted: Motion to approve Resolution 2024-038 and Planning Case 24- 014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an event center and restaurant at 3776 Connelly Avenue, based on the findings of fact and the submitted plans in the July 22, 2024 Report to the City Council. • Denial: Motion to deny Planning Case 24-014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an event center and restaurant at 3776 Connelly Avenue, based on the following findings: findings to deny should specifically reference the reasons for denial and why those reasons cannot be mitigated. • Table: Motion to table Planning Case 24-014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an event center and restaurant at 3776 Connelly Avenue: a specific reason and information request should be included with a motion to table. Deadline for Agency Actions The City of Arden Hills received the completed application for this request on June 12, 2024. Pursuant to Minnesota State Statute, the City must act on this request by August 10, 2024 (60 days), unless the City provides the petitioner with written reasons for an additional 60-day review period. With consent of the applicant, the City may extend the review period beyond the initial 120 days. Budget Impact N/A Attachments A. Draft Ordinance 2024-007 with Draft Summary Ordinance B. Draft Resolution 2024-038 C. Presentation Page 7 of 7 'It �tv H1L1.s ORDINANCE NO.2024-007 CITY OF ARDEN HILLS RAMSEY COUNTY, MINNESOTA AN ORDINANCE AMENDING CHAPTER 13, OF THE ARDEN HILLS CITY CODE CONCERNING AN EVENT CENTER USE IN THE B-2 GENERAL BUSINESS DISTRICT THE CITY COUNCIL OF THE CITY OF ARDEN HILLS, MINNESOTA, ORDAINS: SECTION 1. Chapter 13 — Zoning Code, Section 1305 — Rules, Scope, Interpretation, & Definitions, Subsection 1305.04, is hereby amended by adding the underlined language as follows: Event Center. An establishment which is rented by individuals or groups to host scheduled private events including but not limited to weddings, cultural celebrations, corporate functions, and banquets. Such use ma.. or not include 1) kitchen facilities for the preparation or catering of food; 2) the sale of alcoholic beverages for on -premises consumption only during scheduled events and not open to the _ general public; and 3) outdoor gardens, patios or outdoor - gathering areas. SECTION 2. Chapter 13 — Zoning Code, Section 1320 — District Provisions, Subsection 1320.05 — Land Use Chart, is hereby amended by replacing the chart in its entirety as follows: 1320.05 Land Use Chart. See attached Attachment "A" for the Land Use Chart with the addition of "Event Center" as a Conditional Use in the B-2 Zoning District. SECTION 3. Chapter 13 — Zoning Code, Section 1320 — District Provisions, Subsection 1320.085 — Special Requirements for the B-2 General Business District, is hereby amended by adding a Subdivision 6 as follows: Subd. 6 Event Center Additional Conditional Use Permit Criteria. A. In addition to meetingthe he requirements of Section 1325 and 1355.04 Subd 4, event centers shall conform to the following: 1. The occupancy of the building must never exceed the occupancy, load based on the Fire Marshal's determination. Pagel of 3 2. The serving of alcohol shall be subject to Minnesota State Statute and Chapter 5 - Alcoholic Beverages of the Arden Hills City Code requirements and is permitted only in conjunction with a private event that is not open to the public. 3. Licensing information from the Ramsey County Sheriff's Office ma., b�quested by City. City could at its discretion request licensing information from the County Sheriff s Office. 4. A security —plan shall be submitted and approved by the City; 5. A noise mitigation strategy shall be submitted and approved by the City_ B. In addition to meeting the reauirements of Section 1325 and 1355.04 Subd 4. the Citv mav: 1. Prohibit access from a predominantly residential street; 2. Restrict the hours of operation for loadingdocks; ocks; 3. Require greater than minimum setbacks for structures and driveways; 4. Require opaque screening to eliminate headlight glare; 5. Impose any other restriction it deems to be in the public interest. SECTION 4. Chapter 13 — Zoning Code, Section 1325 — General Regulations, Subsection 1325.06 — Requirements for Parking, Loading and Circulation, is hereby amended by adding the underlined language as follows: J. Off Street Parking Spaces Required: Event Center 1 for every 4 seats (based on design capacity] SECTION 5. Pursuant to Minn. Stat. §412.191, in the case of a lengthy ordinance, a summary may be published. While a copy of the entire ordinance is available without cost at the office of the City Clerk, the following summary is approved by the City Council and shall be published in lieu of publishing the entire ordinance: • Section 1320.04 is amended by adding language to define an Event Center; • Section 1320.05 updates and replaces the Land Use Chart by adding Event Center as a Conditional use in B-2 Zoning District; • Section 1320.085 is amended by adding a new Subdivision 6, Event Center Additional Conditional Use Permit Criteria. This subdivision specifies requirements to allow for an event center in the B-2 General Business District as a conditional use; • Section 1325.06 is amended by the addition of language about required off-street parking spaces for an event center. A printed copy of the whole ordinance is available for inspection by any person during the City's regular office hours at the City of Arden Hills, 1245 West Highway 96, Arden Hills, MN 55112. The Ordinance is also available on the City's website at http://www.cityofardenhills.com. Page 2 of 3 SECTION 6. This Ordinance shall become effective immediately upon its passage and publication according to law. PASSED and ADOPTED this day of 2024, by the City Council of the City of Arden Hills, Minnesota. ATTEST: Julie Hanson, City Clerk CITY OF ARDEN HILLS David Grant, Mayor Page 3 of 3 ATTACHMENT "A" 1320.05 Land Use Chart. (revised XX/XX/24) Uses: Zoning Districts: R-1 - 2 - 3 - 4 NB -1 - 2 B- 3 B- 4 CC GB -1 -2 -FLEX CD POS r T Antenna, Dish or Tower CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA Boarding house C C C C = _ _ __ _= C =_ _ _ _ _ __ _ Brewpub =_ _ __ __ _ = C C C =_ __ __ __ __ _ __ -- Business service =_ _ __ __ =A P P P C P P P P Clinic, medical office =_ _ __ _= P P P P P C P P P P Club or lodge (non-profit) _ _ _ =IP PP — C =_ _ _ _ _ _ -- Club , sports & fitness =_ _ __ __ =A P P P C P P = P == __ _ Commercial recreation - indoor =_ _ __ —_ —_ _= P P P =_ _= P = _ __ -- Daycare Facility, over 10 =_ _ __ = P P P P P == P P P P = __ _ Day care, family - 10 or less A A A — -- -- -- — — — Day care, group family - 14 or less CA CA CA CA CA = CA =_ __ __ __ _ _ _ __ __ -- Dog kennel =_ _ � __ _ = C C Dog run A A Drive -up windows =_ __ __ __ __ _= C C C == A "Dry cleaning & laundry, pick-up station" =_ __ __ _= C ==A A =_ _= A =_ _ _ __ __ -- "Dry cleaning & laundry, self- service laundry" __ _ __ = C = C C Dwelling: density zoning D D D D Dwelling: multiple family =_ = C C C = C = — C C — _ _ Dwelling: single-family attached C C D D = _ _ _ _ _ _ __ -- Dwelling: single-family detached P P P — — — — — — — -- — Dwelling: two-family C C P P C Dwelling: live -work unit =_ _ __ _— C = _ __ __ __ __ __ _ _ Event Center _ — C Financial institution & service =_ _ _ — P P P P P C PP P ip = _ _ Garage, truck = _ _ _ _ _ _ = C C Higher Education, Campus =_ _ __ __ __ _ _ __ __ __ __ _ _ _ _ _= C Home occupation: Class i A A A A A — __ __ _= A =_ _ _ _ _ __ -- Home occupation: Class II CA CA CA CA CA = C =_ _ _ _ Hospital =_ _ __ _ _ __ _ __ __ __ __ _ _ _ otel/motel =_ _ __ _ == == C P C C C House of worship C C C C C C C C C C Micro brewery =_ __ __ __ _= C C C == C =_ _= C Micro distillery =_ __ __ __ _= C C C == C =_ = C Mortuary, funeral home =_ __ __ __ _= P P == C Multiple occupancy building =_ __ __ _= C C C C C C C C C C Nursery C C C C Nursing home and assisted living C C C C == D = _= C Office =_ __ __ _= P P P P P P I P P P P Pawn shop __ __ __ __ __ __ __ _ __ __ __ __ __ __ = P =_ Personal services =_ __ __ _= C A P P P C P =_ _= A Public use C C C C C C C C C C C C C C = __ Research and development facility =_ __ __ _= C P C C C == P P P P C C =_ Research animals =_ __ __ __ _= C = __ __ _= C C Residence Hall, dormitory =_ __ _= C C D Residential facility, state licensed, serving 1- 6 P P P P P == P Residential facility, state licensed, serving 7- 16 C C C C C == C Restaurant and restaurant -fast food =_ __ __ _= C A P P P C P C C Retail sales & service =_ __ __ == A P P P C A A A A School, general education C C C C =_ __ _ _= C School, specialized education =_ __ __ _= C C C C C Service station =_ __ __ __ _= C C =_ _= C C C Solar Energy System A A A = _ _ __ _ __ _ __ _ __ _= C =_ _ Storage, exterior =_ __ __ __ _ __ _ __ _ _= CA Studio =_ __ __ _= C C P P P C Theater, indoor =_ __ __ _= A C P == C LLL Thrift Store =_ __ __ __ _ __ __ _= C =_ _ _= C Utility distribution line P P P P P P P P P == P P P P A P =_ Utility substation =_ __ __ __ __ __ __ __ __ __ __ C C Utility transmission C C C C C C C C C == C C C C C C =_ Vehicle - motorized, leasing and rentals = _ _ __ _ _= C C Vehicle - motorized, service = _ _ C arehousing =__ __ = A A A A == C P P C "P" = Permitted; "D" = Planned Unit; "== " = Not Permitted; "C" = Conditional Use Permit; "A" = Accessory; "CA"= Conditional Accessory Use Permit, "I" = Interim Use Permit" I't EN HILL, CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO.2024-038 RESOLUTION APPROVING A CONDITIONAL USE PERMIT FOR THE SUBJECT PROPERTY AT 3776 CONNELLY AVENUE WHEREAS, City Staff received a complete land use application for 3776 Connelly Avenue ("Subject Property") as part of a Final Planned Unit Development for a Conditional Use Permit on June 12, 2024; WHEREAS, the Subject Property is located in the B-2 — General Business Zoning District and is guided as Community Mixed Use in the Land Use plan; WHEREAS, a Conditional Use Permit is required for an event center in the B-2 Zoning District; WHEREAS, the Applicant has requested as part of the Final Planned Unit Development a Conditional Use Permit in order to allow an event center; WHEREAS, the City Council directed Staff to prepare a Land Use Application Public Policy Notification to notify all property owners within 1000 feet of Subject Property when a request for the Planning Commission is to occur related to a land use application that requires a public hearing; WHEREAS, the City's obligation has been met where the Arden Hills Planning Commission duly held a public hearing on July 10, 2024. All persons present at said meeting were given an opportunity to be heard and present written statements; and WHEREAS the Planning Commission considered the Applicant's request for a Conditional Use Permit and, as such voted 5-1 in favor of recommending approval with conditions. NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF ARDEN HILLS: Hereby adopts Resolution 2024-038 approving Planning Case 24-014 for a Final Planned Unit Development with a Conditional Use Permit at the Subject Property 3776 Connelly Avenue to allow an event center. To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. 1 BE IT FURTHER RESOLVED that City Council approves Planning Case 24-014 for a Final Planned Unit Development with a Conditional Use Permit on the Subject Property 3776 Connelly Avenue, based on the findings of fact and the submitted plans in the July 22, 2024 Report to the City Council, as amended by the following conditions: 1. The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the Community Development Director, shall require review and approval by the Planning Commission and City Council. 2. The Master Planned Unit Development and Final Planned Unit Development for Phases I and II shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by the City Council. The City Council may extend the expiration date of such approval upon written application by the person to whom the approval was granted. 3. A violation of any condition set forth in the permit shall be a violation of this Code, and shall be cause for revocation of the permit. 4. A Master and Final PUD Development Agreement shall be prepared by the City Attorney and subject to City Council approval for the Development. The Master and Final PUD Development Agreement shall be fully executed prior to the issuance of building permits. Prior to the issuance of a building permit, a landscape financial security equal to 125% of the cost of the landscaping to be installed on the site shall be submitted. The Applicant must submit a detailed cost estimate for the landscaping so staff can determine the final amount. Landscape financial security shall be held for two full growing seasons. For any landscaping that is not in accordance with the approved landscaping plan at the end of two growing seasons, the Developer shall replace the material to the satisfaction of the City before the guarantee is released. Where this is not done, the City, at its sole discretion, may use the proceeds of the performance guarantee to accomplish performance. 5. A Grading and Erosion permit shall be obtained from the city's Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey County (i.e. ROW or access) prior to the start of any site activities. 6. The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit. 7. Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and Community Development Director prior to the issuance of a grading and erosion control permit or other development permits. 8. Upon completion of grading and utility work on the site, a grading as -built and utility as -built shall be provided to the City for review. 9. Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site. 10. The Applicant shall be responsible for protecting the proposed on -site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. 2 Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant. 11. All light poles, including base, shall be a maximum of 20 feet in height and shall be shoebox style, downward directed, with high-pressure sodium lamps or LED and flush lenses. 12. All rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. 13. A separate sign permit shall be required for all signs on the site. 14. Any future trash and vacuum enclosures shall utilize gates and be constructed on three sides using the same materials and patterns used on the building. Locations shall be approved by the Planning Department. 15. The Applicant shall be financially responsible for all applicable water and sanitary charges. Rates applied shall be memorialized in the Development Agreement. 16. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shall mow and maintain all site boulevards to the curb line of the public streets. 17. The proposed structure shall conform to all other regulations in the City Code. 18. The Applicant shall provide benches near the primary entrance of the building. 19. The Applicant shall be required to install curbing around parking islands with parking lot improvements. 20. Screening for ground -mounted mechanical equipment shall meet the requirements of the Zoning Code. 21. The Applicant shall be required to cease hours of operation at 2 AM for commercial land uses approved as part of the PUD. 22. The Applicant shall be required for parking lot improvements to relocate the driveway access including curbing so that it is entirely located within the non -vacated portion of Connelly Avenue in a manner compliant with city codes. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 22" a DAY OF JULY, 2024. David Grant, Mayor ATTEST: Julie Hanson, City Clerk To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage. 3 Actions to Consider • Adoption of Ordinance 2024-007 for Planning Case 24-014 for Zoning Code Amendments to Chapter 13, Section 1305 — Rules, Scope, Interpretation, & Definitions, Section 1320 — District Provisions, and Section 1325 — General Regulations to add language for an event center use in the B-2 General Business District by conditional use permit and authorization to publish a Summary Ordinance of 2024-007 for Planning Case 24-014. • Planning Case 24-014 and the adoption of Resolution 2024-038 for the Elegant Event Center Master Planned Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan Review for the proposed project on 3776 Connelly Avenue to allow for the site to be redeveloped as an event center and restaurant. Deadline for Agency Action • The City of Arden Hills received the completed application for this request on June 121 2024. Pursuant to Minnesota State Statute, the City must act on this request by August 10, 2024 (60 days), unless the City provides the petitioner with written reasons for an additional 60-day review period. With consent of the applicant, the City may extend the review period beyond the initial 120 days. Findings of Fact —Zoning Code Text Amendment 1. Rose Kukwa, the Applicant, is proposing amendments to the language of Chapter 13 — Zoning Code of the City Code. 2. Under the City's Zoning Code Section 1305.04, Definitions, the City does not define an event center use. 3. The Applicant is proposing an amendment to define an event center and allow for the use in the B-2 General Business District through a conditional use permit. 4. The Applicant is proposing additional criteria in the ordinance language to establish a minimum parking requirement of 1 parking per 3 seats at design capacity. 5. Of local communities surveyed, the majority allow an event center use through a conditional use permit in at least one commercial zoning district. 6. Amendments to the Zoning Code regulations require a public hearing prior to action by the City Council. 7. The Planning Commission held a public hearing for this land use application on July 10, 2024. Findings of Fact — PUD, CUP, and Site Plan Review 1. The property located at 3776 Connelly Avenue is designated for Community Mixed uses on the 2040 Comprehensive Plan. 2. New building construction or site modification identified requires the submittal of a Site Plan Review application prior to construction. 3. For proposals for new construction, redevelopment of a site, and significant modifications to existing sites a PUD is required. 4. The PUD process allows for flexibility within the City's regulations through a negotiated process with a Developer. S. The Applicant has proposed a Master and Final Planned Unit Development for the development of one approximate 11,000 square foot event center with additional restaurant and adult day care uses on the Subject Property. 6. The Applicant has proposed a phased development plan with Phase I referred to as the event center to be established following the land use approvals herein, Phase II referred to as the restaurant to be established directly following Phase I and for Phase III referred to as the adult day care to be established approximately one (1) year later. 7. The Applicant has proposed for the approval of Phase I for an event center and Phase II for a restaurant as part of the Master PUD and will need to submit for a Final PUD amendment approval for Phase III for the adult day care use. 8. The Master and Final Planned Unit Development generally conforms to the requirements of the City Zoning Code and design standards. 9. Where the plan is not in conformance with the City Code, flexibility has been requested by the Applicant. 10. Flexibility through the PUD process has been requested in the following areas: parking requirements, landscaping, building materials, transparency, signage, lighting, and site furnishings. 11. A public hearing for a Master Planned Unit Development, Final Planned Unit Development, and Conditional Use Permit request is required before the request can be brought before the City Council. 12. The Planning Commission held a public hearing for this land use application on July 10, 2024. Options and Motion Language — Text Amendments • Approval: Motion to adopt Ordinance 2024-007 for Planning Case 24-014 for Zoning Code Amendments to Chapter 13, Sections 1305.04, 1320.051 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit and authorization to publish a Summary Ordinance of 2024-007 for Planning Case 24-014, based on the findings of fact and as presented in the July 22, 2024 Report to the City Council. • Approval with Amendments: Motion to adopt Ordinance 2024-007 for Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit and authorization to publish a Summary Ordinance of 2024-007 for Planning Case 24-014, based on the findings of fact and as presented in the July 22, 2024 Report to the City Council, with amendments: a specific reason should be included with all amendments. • Denial: Motion to deny Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.05, 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit and authorization to publish a Summary Ordinance of 2024-007 for Planning Case 24-014, based on the following findings: findings to deny should specifically reference the reasons for denial and why those reasons cannot be mitigated. • Table: Motion to table Planning Case 24-014 for a Zoning Code Amendment to Chapter 13, Sections 1305.04, 1320.051 1320.085, and 1325.06 of the Arden Hills City Code to allow for an Event Center use in the B-2 General Business District through a conditional use permit and authorization to publish a Summary Ordinance of 2024-007 for Planning Case 24-014: a specific reason and information request should be included with a motion to table. Options and Motion Language — PUD, CUP, and Site Plan Review • Approval with Conditions: Motion to approve Resolution 2024-038 and Planning Case 24-014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an Event Center and Restaurant at 3776 Connelly Avenue, based on the findings of fact and the submitted plans, as amended by the 22 conditions in the July 22, 2024 Report to the City Council. • Approval as Submitted: Motion to approve Resolution 2024-038 and Planning Case 24-014 for a Master Panned Unit Development, Final ^Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an event center and restaurant at 3776 Connelly Avenue, based on the findings of fact and the submitted plans in the July 22, 2024 Report to the City Council. • Denial: Motion to deny Planning Case 24-014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an event center and restaurant at 3776 Connelly Avenue, based on the following findings: findings to deny should snecifically reference the reasons for denial and why those reasons cannot be mitigated. • Table: Motion to table Planning Case 24-014 for a Master Planned Unit Development, Final Planned Unit Development for Phases I and II, Conditional Use Permit, and Site Plan Review for an event center and restaurant at 3776 Connelly Avenue: a specific reason and information request should be included with a motion to table. PC Recommended Conditions of Approval The project shall be completed in accordance with the submitted plans as amended by the conditions of approval. Any significant changes to these plans, as determined by the Community Development Director, shall require review and approval by the Planning Commission and City Council. The Master Planned Unit Development and Final Planned Unit Development for Phases I and II shall expire one year from the date of City Council approval unless a building permit has been requested or a time extension has been granted by the City Council. The City Council may extend the expiration date of such approval upon written application by the person to whom the approval was granted. A violation of any condition set forth in the permit shall be a violation of this Code, and shall be cause for revocation of the permit. 4. A Master and Final PUD Development Agreement shall be prepared by the City Attorney and subject to City Council approval for the Development. The Master and Final PUD Development Agreement shall be fully executed prior to the issuance of building permits. Prior to the issuance of a building permit, a landscape financial security equal to 125% of the cost of the landscaping to be installed on the site shall be submitted. The Applicant must submit a detailed cost estimate for the landscaping so staff can determine the final amount. Landscape financial security shall be held for two full growing seasons. For any landscaping that is not in accordance with the approved landscaping plan at the end of two growing seasons, the Developer shall replace the material to the satisfaction of the City before the guarantee is released. Where this is not done, the City, at its sole discretion, may use the proceeds of the performance guarantee to accomplish performance. 5. A Grading and Erosion permit shall be obtained from the city's Engineering Division prior to commencing any grading, land disturbance or utility activities. The Applicant shall be responsible for obtaining any permits necessary from other agencies, including but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey County (i.e. ROW or access) prior to the start of any site activities. The final plans shall be subject to approval by the City Engineer, Building Official, and Fire Marshal prior to the issuance of a grading and erosion control permit. 7. Final grading, drainage, utility, and site plans shall be subject to approval by the Public Works Director, City Engineer, and Community Development Director prior to the issuance of a grading and erosion control permit or other development permits. 8. Upon completion of grading and utility work on the site, a grading as -built and utility as -built shall be provided to the City for review. 9. Heavy duty silt fence and adequate erosion control around the entire construction site shall be required and maintained by the Developer during construction to ensure that sediment and storm water does not leave the project site. PC Recommended Conditions of Approval 10. The Applicant shall be responsible for protecting the proposed on -site storm sewer infrastructure and components and any existing storm sewer from exposure to any and all stormwater runoff, sediments and debris during all construction activities. Temporary stormwater facilities shall be installed to protect the quality aspect of the proposed and existing stormwater facilities prior to and during construction activities. Maintenance of any and all temporary stormwater facilities shall be the responsibility of the Applicant. 11. All light poles, including base, shall be a maximum of 20 feet in height and shall be shoebox style, downward directed, with high-pressure sodium lamps or LED and flush lenses. 12. All rooftop or ground mounted mechanical equipment shall be hidden from view with the same materials used on the building in accordance with City Code requirements. 13. A separate sign permit shall be required for all signs on the site. 14. Any future trash and vacuum enclosures shall utilize gates and be constructed on three sides using the same materials and patterns used on the building. Locations shall be approved by the Planning Department. 15. The Applicant shall be financially responsible for all applicable water and sanitary charges. Rates applied shall be memorialized in the Development Agreement. 16. All disturbed boulevards shall be restored with sod. All areas of the site, where practical, shall be sodded or seeded and maintained. The property owner shall mow and maintain all site boulevards to the curb line of the public streets. 17. The proposed structure shall conform to all other regulations in the City Code. 18. The Applicant shall provide benches near the primary entrance of the building. 19. The Applicant shall be required to install curbing around parking islands with parking lot improvements. 20. Screening for ground -mounted mechanical equipment shall meet the requirements of the Zoning Code. 21. The Applicant shall be required to cease hours of operation at 2 AM for commercial land uses approved as part of the PUD. 22. The Applicant shall be required for parking lot improvements to relocate the driveway access including curbing so that it is entirely located within the non -vacated portion of Connelly Avenue in a manner compliant with city codes. Questions? Planning Case 24-014 — Elegant Event Center