HomeMy WebLinkAbout08-19-24-SWSPUBLIC INQUIRIES/INFORMATIONAL
This is an opportunity for citizens to respectfully bring to the Council ’s attention any
items which are relevant to the City. In addressing the Council, you must first state
your name and address for the record. Comments shall be limited to three (3) minutes
or less. Written documents or other materials should be handed to the City Clerk for
distribution to the Council prior to or during the meeting. Council will generally not
respond at the same meeting where an issue is initially raised by a member of the
public but the Council may refer the issue to staff for further research and possible
report or action at a future Council meeting.
RESPONSE TO PUBLIC INQUIRIES
AGENDA ITEMS
Public Works Staffing Discussion
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
2025 Preliminary 2025 General Fund Budget
Joua Yang Finance Director
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:
David Grant
Councilmembers:
Brenda Holden
Emily Rousseau
Tena Monson
Tom Fabel
Special City Council
Work Session Agenda
August 19, 2024
5:00 p.m.
City Hall
Address:
1245 W Highway 96
Arden Hills MN 55112
Phone:
651 -792 -7800
Website :
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting, strong residential
neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and
our long -standing tradition as a desirable City in which to live, work, and play.
Members of the public may attend a
meeting in -person at City Hall or they
may view the meeting remotely on the
City ’s website using the below link.
Meetings are also broadcast on Cable
Channel 16 for those that live in Arden
Hills.
https://cityofardenhills.org/320/Watch -
City -Meetings
This meeting will be streamed live on local Cable Channel 16 and available for playback on our
website.
CALL TO ORDER
1.
2.
3.
3.A.
Documents:
3.B.
Documents:
4.
PUBLIC INQUIRIES/INFORMATIONALThis is an opportunity for citizens to respectfully bring to the Council ’s attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting.RESPONSE TO PUBLIC INQUIRIES
AGENDA ITEMS
Public Works Staffing Discussion
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
2025 Preliminary 2025 General Fund Budget
Joua Yang Finance Director
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:David GrantCouncilmembers:Brenda HoldenEmily RousseauTena MonsonTom Fabel Special City Council Work Session AgendaAugust 19, 2024 5:00 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsThis meeting will be streamed live on local Cable Channel 16 and available for playback on our website.CALL TO ORDER1.2.
3.
3.A.
Documents:
3.B.
Documents:
4.
Page 1 of 3
AGENDA ITEM – 3A
MEMORANDUM
DATE: August 19, 2024
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, Interim City Administrator
FROM: David Swearingen, P.E. Public Works Director / City Engineer
SUBJECT: Proposed Public Work Department Organizational Chart
Budgeted Amount: Actual Amount: Funding Source:
$0 $138,278.21 (Phase 1) 72% General Fund
$113,304.07 (Phase 2) 28% Enterprise Funds
Council Should Consider
• The proposed modifications to the Public Work Department Organizational Chart
• Direction for staff to implement Phase 1 in 2025
Background
This item is the proposed modified organizational structure and staffing changes related to the
Public Works Department that the Public Works Director/City Engineer is requesting as a “needs
now” to perform City business more effectively at the level of service that is demanded. On July
18, 2024 this item was presented to the Personnel Committee, the recommendations were to
bring Phase 1 to Council for consideration to implement in 2025 and Phase 2 and Phase 3 would
be considered at a later time if/when Phase 1 was up and running to Staff’s satisfaction.
Attachment A shows the “needs now” organizational chart as a whole and is followed with color
coded proposed phasing. The phasing is not labeled with an exact timeline but it is anticipated it
would be implemented year after year, 2025 for Phase 1 and 2026 for Phase 2. Another page in
Attachment A and below in the Budget Impact section is the estimated budget for Phase 1 and
Phase 2, these have been updated by the Finance Director. Phase 3 is dependent upon a signed
Development Agreement for Rice Creek Commons, strategy for this can be discussed further at
the meeting.
Also provided, as only a reference, are the “current” PW org chart and what is anticipated for
TCAAP “full-build” PW Org Chart.
Page 2 of 3
Attachment B is a compilation of Public Works organizational charts from surrounding cities
relatable in population size. Certain elements from these were used in developing the proposed
org chart for Arden Hills to fit the City’s needs.
Primary duties of the Parks and Recreation Manager:
• Parks capital project planning, budgeting and implementation
• Natural Resources management
• Forestry
• Manages Parks maintenance policies
• Rain gardens
• Volunteer Coordination
• Grant management
• PTRC staff liaison
• Manages Recreation program and staff
• Parks development
• Maintain relationships and coordinates with surrounding agencies
Primary duties of the Maintenance Lead:
• Lead the day-to-day activities
• Plan work within their division from week-to-week
• Implement division tasks outlined in the Public Works Maintenance Plan
• Quality control
• Assists in the preparation of the Public Works Maintenance Plan
The Maintenance Lead position will allow for more detailed maintenance/repair information to
be prepared for each division to put us in a “proactive” maintenance state and get us away from
being “reactive”.
To manage labor force needs, the Maintenance Leads, PW Superintendent, Assistant PW
Director, Public Works Director/City Engineer and Parks and Recreation Manager will all meet
weekly to discuss scheduling and determine what labor force is needed to accomplish activities
outlined in the Public Works Maintenance Plan (Attachment C) and other project or City
function coordination needs. All Maintenance Workers and all Maintenance Leads are still
required to be cross-trained and supplement labor needs in all divisions.
At this time, there are no proposed changes to the existing Fleet Lead position as it is written
within the MOU through the union contract.
For the consultant services, the Public Works Director/City Engineer is recommending the City
select a primary consultant to provide engineering and specialty services. The advantage of a
primary consultant is the availability of a deep bench with a broad depth of specialized personnel
in various categories related to City functions. This direct resource would be more efficient
instead of having City staff manage multiple consultants if they need to coordinate on related
projects. It is intended that the PW Director/City Engineer would be the direct manager of the
consultant but services would be available to other City Departments as well.
Page 3 of 3
Discussion
The Public Works Director/City Engineer is proposing that Phase 1 be implemented starting
January 2, 2025.
Looking at the CIP for 2025, there are many Parks related projects and there have been recent
discussions by Council of conducting a Parks Master Plan. It would be ideal to have the Parks
and Recreation Manager position in place at the beginning of 2025 to coordinate and manage
those processes. If staff receives direction for the proposed timing of this position, recruitment
will need to begin in September 2024.
For the Maintenance Lead positions, due to the cycle of the Public Works Maintenance Plan and
this position being a new function to the existing maintenance team, it’s expected to take some
time to develop and train the staff to their new roles. Ideally this would be initiated at the
beginning of 2025 prior to projects that start up when temperatures allow.
For the consultant services, if directed, staff will engage with a desired firm and develop a
Professional Services Agreement contract to have approved by Council at a future meeting with
an effective date of January 2, 2025.
Budget Impact
Attachments
Attachment A – Arden Hills Public Works Organizational Chart
Attachment B – Surrounding Cities PW Org Charts
Attachment C – 2024 Public Works Maintenance Plan
Public Works Director/City Engineer
PW Superintendent
PW Maintenance
Workers (x5 FTE’s)
Recreation Program
Coordinator
PW Office Support
Arden Hills
Proposed (needs now) Public Works Org. Chart
Asst. PW Director
Fleet Lead
(working)
Parks & Recreation
Manager
Street Lead
(working)
Utilities Lead
(working)
Parks Lead
(working)
PW Maintenance Apprentice
(Contingent on RCC DA)
Consultant Services
•Natural Resources mgmt.
•Parks Strategic Planning
•Forestry
•Water Resources –MS4 mgmt.
•GIS Services
•Planning/Development Engineering
•General Engineering services
Seasonals (x8)
Recreation Intern (x2)
Attachment A
Public Works Director/City Engineer
PW Superintendent
PW Maintenance
Workers (x5 FTE’s)
Recreation Program
Coordinator
PW Office Support
Arden Hills
Proposed (needs now) Public Works Org. Chart
Asst. PW Director
Fleet Lead
(working)
Parks & Recreation
Manager
Utilities Lead
(working)
Parks Lead
(working)
Consultant Services
•Parks Strategic Planning
•Water Resources –MS4 mgmt.
•GIS Services
•Planning/Development Engineering
•General Engineering services
Seasonals (x8)
Recreation Intern (x2)
Phase 1
Public Works Director/City Engineer
PW Superintendent
PW Maintenance
Workers (x5 FTE’s)
Recreation Program
Coordinator
PW Office Support
Arden Hills
Proposed (needs now) Public Works Org. Chart
Asst. PW Director
Fleet Lead
(working)
Parks & Recreation
Manager
Street Lead
(working)
Utilities Lead
(working)
Parks Lead
(working)
Consultant Services
•Natural Resources mgmt.
•Parks Strategic Planning
•Forestry
•Water Resources –MS4 mgmt.
•GIS Services
•Planning/Development Engineering
•General Engineering services
Seasonals (x8)
Recreation Intern (x2)
Phase 2
Public Works Director/City Engineer
PW Superintendent
PW Maintenance
Workers (x5 FTE’s)
Recreation Program
Coordinator
PW Office Support
Arden Hills
Proposed (needs now) Public Works Org. Chart
Asst. PW Director
Fleet Lead
(working)
Parks & Recreation
Manager
Street Lead
(working)
Utilities Lead
(working)
Parks Lead
(working)
PW Maintenance Apprentice
(Contingent on RCC DA)
Consultant Services
•Natural Resources mgmt.
•Parks Strategic Planning
•Forestry
•Water Resources –MS4 mgmt.
•GIS Services
•Planning/Development Engineering
•General Engineering services
Seasonals (x8)
Recreation Intern (x2)
Phase 3
Phasing budget needs
•Maintenance Lead “proposed” rate range = $38.72 -$44.89
•Current Maintenance Worker top step = $36.19/hr
•Parks & Recreation Manager (proposed Grade 14) = $100,230.20 (Top Step)
•Consultants = $11,130 increase ($78,870 existing)
Public Works Director/City Engineer
PW Superintendent
PW Maintenance
Workers (x7 FTE’s)
Recreation Supervisor
Office Support
Current City of Arden Hills PW Org. Chart
Asst. PW Director
Fleet Lead (working)
Consultant Services
–As approved by
City Council
Seasonals (x8)
Recreation Intern (x2)
Public Works Director/City Engineer
PW Superintendent
PW Maintenance
Workers (x8 FTE’s)
Recreation Programmer
PW Office Support
Arden Hills
Proposed (TCAAP) Public Works Org. Chart
Deputy PW Director
Fleet Lead
(working)
Parks & Recreation
Coordinator
Street Lead
(working)
Utilities Lead
(working)
Parks Lead
(working)
PW Seasonals (x12)
Consultant Services
•Water Resources –MS4 mgmt.
•GIS Services
•Planning/Development Engineering
•General Engineering services
Senior Engineering Tech
Parks & Rec. Director
Natural Resources
Specialist
Engineering Intern
Recreation Intern (x2)
Administrative
Assistant to the
PW/PR Directors
01/07/16 TBS
City Administrator
Police Chief
City Clerk
Community
Development
Director
Pks Lead
PW Supt
Pks Maint
Pks Maint
City of Mendota Heights
Organizational Chart 2022
Rec Program
Coordinator
Contract Svc
Attorneys
Planner
Consultants
Director PW
Assistant City
Administrator
Sts Lead
Sts Maint
Sts Maint
Sts Maint
Util Lead
Mechanic
Senior
Engineering
Tech
Facilities
Manager
Finance Director
Fire Chief
Seasonal
Parks
Seasonal
Utility
Accounting
Clerk
Utility Billing
Clerk
Office Support
Assistants
Parks and
Recreation
Manager
Communications
Coordinator
Office Support
Assistant
Deputy Clerk/ Fire
Department Secretary
Asst. City
Engineer
Natural Resources
Coordinator
/ City Engineer
Pop. - 11,492
Attachment B
PW/PR Director
Engineering Division
Engineering Tech
GIS Specialist
NEW Position Storm
Water Tech
PW/PR Assistant or Deputy Director
New Position
Public Works Working Forman
Park Division
Parks Senior Worker
(1) Parks Worker
Seasonal
Workers
(4 summer – 1 fall)
Streets Division
Streets Senior Worker
(1) Streets
Seasonal
Workers
(2)
Vehicle and
Equipment
Maintenance
Mechanic
Utility Division
Senior Utility Worker
(1) Water Division
(1) Sanitary Sewer
Open
Sanitary Sewer
Forestry
Arborist
Seasonal Worker
(1)
Storm Water
Seasonal Worker
(1)
Recreation Superintendent
Event Center
Manager/ Program
Coordinator
Program Coordinator
Event Center
Staff
Park Program, Seasonal and
Part Time Staff
Front Desk Lead
Front Desk Staff
New Position Facility
Supervisor (if Community
Center is Expanded)
Facility
Maintenance
Custodian
Contracted Cleaning
Building Contracts
(HVAC, Fire, Alarms,
Roofing etc..)
Front Office Assistant
(PT)
Administrative Assistant to the
Public Works Director
City of Mounds View
Public Works/Park and Recreation
Org Chart 2023
Pop. 12,603
Consultant is the City Engineer -
Stantec
Vadnais Heights Pop. - 12,713
Engineering
contracted - SEH
City Engineer
Rec. asst.Rec. Coord.
Public Services
Director
Park
Maintenance
Supervisor
Park
Maintenance
Workers (5)
Street
Maintenance
Supervisor
Street Lead
Street
Maintenance
Workers (7)
Utility
Maintenance
Supervisor
Utility Lead
Utility
Maintenance
Workers (5)
Mechanics (2)PS Technician (2)
Office Assistant
Asst. Public
Services Director
Park & Recreation is contracted and
Community Ed. runs Rec programs
Bolton & Menk provides Engineering
services - City Engineer
Pop. - 13,033
City of Waconia
Victoria – pop. 10,546
PW Director
Utilities Superintendent
Parks & Rec. Director
Parks & Rec. Manager
Rec. Programmers Rec. Admin
Contract Engineering
Utility Operators X 3 Street/Storm Lead Parks Maint. Lead
Street/Storm Operators X 2 Parks Maint. Operators x 3
Public Works Organizational Chart
Residents
Mayor & City
Council
City
Administrator
Public Works
Director
Streets Lead
Worker
Utilities Lead
Worker
Parks Lead
Worker
8 Full Time
Workers &
Seasonal Workers
Mechanic
Public Works
SƵƉĞƌǀŝƐŽƌ
Administrative
Assistant
Engineering
Technicians
Population 16,408
City Engineer is a consultant
-WSB
Parks/Rec is a separate
department, Parks Planner
position is under Community
Development
Joe Steele - Streets/Fleet Supervisor
Matt Mallory - Parks Maintenance II
Ryan Anderson - PW Maintenance I Chris Utech - PW Maintenance I
Jim Mayer - PW Apprentice
Scott Heaton - PW Maintenance II
City of Little Canada - pop. 10,261
Department of Public Works
Organizational Flow Chart
Chris Heineman - City Administrator
Bill Dircks - Public Works Director Steve Anderson - Parks & Recreation Director
Recreation Coordinator
Recreation Coordinator (.25 FTE)
Eningeering Contracted - Bolton & Menk
Derek Anderson - Parks SupervisorAlex Evenson - Utilities Supervisor
1RUWK%UDQFK2UJDQL]DWLRQ&KDUW
1RUWK%UDQFK: /&RPPLVVLRQ &RQWUDFW &LW\RI1RUWK%UDQFK
&LW\&RXQFLO
&LW\$GPLQLVWUDWRU
3XEOLF:RUNV'LUHFWRU )LQDQFH'LUHFWRU ,7'LUHFWRU
*HQHUDWLRQ
/HDG
3XEOLF:RUNV
$GPLQLVWUDWLYH
6SHFLDOLVW
:DWHU
/HDG
8WLOLW\
%LOOLQJ
&OHUN
8WLOLW\
)LQDQFH
0DQDJHU
:DVWHZDWHU
/HDG
3XEOLF
:RUNV
0DLQWHQDQFH,
6WDII
:DWHU
2SHUDWRU
$FFRXQWDQW $FFRXQW&OHUN
:DVWHZDWHU
2SHUDWRU
Pop. - 11,113
CD Director
Parks & GIS
Director
Engineering Services Contracted
Public Works Director Contracted -
City Engineer & Asst. City Engineer
Asst. Public Works Director
Lead Operator
Operator 1
Operator 2
Operator 3
8 Total
4 - Seasonals
Engineering Intern
Lake Elmo – pop. 13,449
- Currently working on adding
Parks specific maint. Staff
- No Rec. department
PUBLIC WORKS MAINTENANCE PLAN
2024
Prepared by:
Jeff Frid
March 8, 2024
$WWDFKPHQW&
Table of Contents
Page #
Parks Maintenance Plan 1 – 12
Streets Maintenance Plan 13 – 16
Water Distribution Maintenance Plan 17 – 24
Sanitary Sewer Maintenance Plan 25 – 33
Surface Water Maintenance Plan 34 – 41
1
2024 Parks Maintenance Plan
Maintaining the City Parks and city owned property is outlined in the Parks Maintenance Policy (Parks
MP, last revised 2010) and outlines four levels of service. Some of the maintenance and techniques have
deviated since the last revision to this policy, to create a more efficient work flow, utilization of current
PW equipment, staffing, and products on the market.
Public Works utilizes four types of labor resources that will be referenced in the 2024 Plan. See below,
the types and abbreviations used in the plan.
• Full Time Public Works Staff (FTE)
• Seasonal part time Staff (SPT)
• MN Corrections Work Crew (ICWC)
• Volunteer Organizations/Groups/Individuals (VOL)
Routine park maintenance based on the level of service each park is assigned in the Parks MP, will
receive routine mowing, trimming, trash pickup, and snow plowing paved trails, (excluding minimum
maintenance trails) and misc. maintenance. Road side sidewalks plowing is completed in conjunction
with street plowing, see snow plow policy for details.
Cummings trail maintenance (map below) will include paving the red highlighted trail. This section of
trail has been identified to pave over the existing trail or reclaim and pave in some areas. Removal of
dead/ diseased trees and trees that either need to be trimmed or removed as preventative maintenance
will be completed prior to the trail project. Restoration of green space disturbed by the project will take
place after the paving is complete. Park benches within the work area will be assessed for repair or
replacement needs as part of this project.
2
Trail/ Park tree trimming and diseased tree removal
This work will be focused at Chatham Open Space, Freeway Park and Arden Oaks Parks this year.
Removal of buckthorn and other invasive will be completed as time and recourses allow. A map will be
created for the Chatham Open-Space removals along with a 2025 replanting plan.
Chatham Open Space has many locations along the trail system that will require contracted tree
trimming or full removals. PW only targets trees along the trail system that are a potential hazard to life
or private property.
Add Woodchips to “Natural” Trails. Volunteer or ICWC potential projects at-
• Crepeau Nature Preserve
• Floral Woodland Trail
• RC open space trail north of County Rd E2
• Chatham open space trail specific locations
• Trail extension near Old Hwy 10 & County Rd E2 Open Space
Arden Oaks and Freeway Parks
• Complete a full tree inspection, tree removals and recommendation of a tree planting plan for
the 2025 Park Improvement project.
• Rain garden assessment at Freeway Park and create a plan for needs.
• Freeway Park warming house exterior repairs, repainting, and roof inspection. Complete as
needed roof repairs.
• Remove guardrail at lower area of Freeway Park
3
Perennial gardens on-going maintenance, which includes weeding, re-planting and mulching will be
completed, as needed, at the 22 garden locations shown on the map below. A combination of labor is
utilized as available.
• Split daylilies from Highway 96 gardens and re-plant to fill gardens around the city as needed.
Irrigation system maintenance is started in the spring and winterized in the fall. During spring startup,
PW FTE’s test each system is operating properly and make any repairs as needed. Throughout the
summer months, the irrigation systems need to be periodically checked for efficient watering and
adjusted as needed. Listed below are the parks and city-owned property maintained by PW:
• City Hall
• Highway 96 median gardens (between Highway 10 and Lexington Ave)
• Cummings Park
• Perry Park
• Hazelnut Park
• Triangle monument sign property
An improvement to the Perry Dog Park can be made, if time allows, to tap-off of the existing irrigation
system to supply a water source for public use while the dog park is open.
Create a plan and cost estimates for a permanently installed irrigation system along Lake Shore Place.
Spot Planting replacement and addition of irrigation to Lake Shore Place landscaping.
Our PW Tree Inspector completed an inspection of the landscaping in 2023. There is a total of 35
arborvitae bushes that run along the east side of the roadway. Of the 35, 17 were determined in need of
replacement. With the condition of the soils, and location the bushes are planted, irrigation is necessary
to ensure proper growth.
Highway 96 median and City Hall perennial gardens are scheduled for spot plant replacement or infill
from dead plants.
4
Softball in-field grading and maintenance work to be completed spring timeframe by FTE’s. Field
lighting, fencing, dugouts, bases, base boxes, trash/recycling receptacles and field signage will be
inspected and repaired as needed. Ongoing maintenance, field preparation prior to practices and games
is completed by SPT Staff. The park location and number of fields is listed below.
• Cummings Park (1 field)
• Royal Park (1 field)
• Floral Park (1 field)
o Evaluate for outfield drain tile installation in 2025. Discharge collected water into the
2024 PMP surface water improvements.
• Perry Park (3 fields)
• Hazelnut Park (1 field)
Athletic field striping and setup is completed for soccer and soft ball fields and is completed at the
following parks throughout the spring, summer, and fall. This includes the initial field layout and soccer
goal setup completed by FTE’s.
• Royal Park (foul lines)
• Cummings Park (foul lines, 2 adult soccer fields, 1 youth soccer field)
• Floral Park (foul lines)
• Perry Parks foul lines, 3 fields)
• Hazelnut Park (foul lines, 2 adult soccer fields)
• Valentine Hills Elementary running track
Lake Shore Place ROW shrub replacement
5
Weed control, aeration and fertilization of city-owned property is completed at the locations shown on
the map below. PW staff completes that work throughout the city, annually, using a concentrated liquid
herbicide and a slow release granular fertilizer. This project is typically completed in early summer.
6
Tree and miscellaneous watering is completed with tree bags during the first 2-3 years after planting.
New trees that were planted in 2022 will receive tree bags and fertilized on a routine basis throughout
the growing season. The majority of new trees were planted along Highway 96. In an effort to establish
grass within PW project areas, the tanker will be used for that purpose. Other park plantings may also be
watered using the tanker truck depending on seasonal rainfall.
Tree mulching “top dressing “will be completed around all trees located along Highway 96 ROW
between Highway 10 and Lexington Ave.
Diseased tree removal at Freeway and Arden Oaks Parks. A tree contractor will remove trees larger than
12”. All stumps located in green/mowed spaces will be ground and restored. The Floral Park tree
planting plan is still underway.
The process for tree inspection and the rating system used by our 3 PW licensed tree inspectors is the
same for both proactive and reactive (resident requested) tree inspections. Using a mobile GIS
application, our inspector uses guidelines and reviews research from the MN Department of Agriculture
and personal experience to assess the overall health of each tree on both private and public property.
Ultimately, during the inspection we are looking for trees that are a health safety hazard or trees that
are diseased and have the potential of spreading the disease to surrounding trees. PW understands the
importance of habitat dead trees provide to wildlife.
Floral and Cummings Park Tree Planting Plan
A tree re-planting plan was developed by our tree inspector for Floral and Cummings Parks for infill after
removing EAB infected ash trees. The 2023 Maintenance plan identified a significant number of EAB ash
tree removals at Cummings and Floral Parks.
• Cummings recommendations
o 2 sugar maples, 1 crimson king maple, 2 pagoda dogwood, 2 swamp white oak
• Floral recommendations
o 3 crimson king maple, 2 Norway pine
The EAB policy states all ash trees removed will be replaced. We believe the original intent for that
statement was to replace trees in open park spaces and not necessarily deep woods. Although, in seeing
the number of trees to be removed we recommend replacing a percentage rather than a 1 to 1
replacement. The location, and quantity of new trees planted, direction is desired from the PTRC and
City Council.
7
Cummings Park
Floral Park
8
Buckthorn and invasive species removal are generally completed by the ICWC and/or VOL’s groups, with
the assistance of FTE’s. The highlighted areas on the maps of Cummings, Floral, and Chatham Open
Space indicate where invasive plants can be removed (as time, resources and ICWC availability allow) in
2024. The zones were chosen based on work completed in 2020-2023. Note: Chatham Open Space had
significant amounts of buckthorn removed by volunteers and the goat grazing project in 2023. Goat
grazing in the Chatham Open Space is also planned for June 2024. Public Works will coordinate removals
alongside goat grazing project within the highlighted areas.
9
Hockey board preventative maintenance will include pressure washing and sealing the boards with a
clear sealer at Hazelnut Park. This project can be completed by volunteers with the assistance of FTE’s.
The Hazelnut Park hockey rink is highlighted below.
Play structure wood fiber/mulch maintenance will be completed based on the spring playground
inspection measurements of mulch depth. Monthly play structure inspections are completed during the
spring, summer, and fall months. During inspections, damaged or vandalized equipment will be replaced
and the structure is checked for overall safety. Arden Oaks and Freeway Parks will have mulch replaced
as part of the improvement project in 2025.
A full replacement of the play structure fiber mulch is scheduled for every 10 years as a guideline.
Valentine Park and Royal Hills Park are proposed for this year.
The map below outlines all play structures citywide.
10
Park Building maintenance – monthly inspections, and project details below.
• Cummings Pavilion
o Full replacement of the south furnace. (The north furnace was replaced February 2024)
o Pressure wash concrete patio, sidewalks, picnic tables, and exterior of the building.
o Replace furnace and water fountain filters.
o Contract to clean HVAC duct system.
o Sanitize and deodorize interior rubber flooring.
• Perry Pavilion
o Pressure wash concrete patio/ sidewalks, picnic tables, and exterior of the building.
o Replace the men restroom door and frame.
o Full roof replacement will be scheduled in spring of 2024.
o Paint walls in the restrooms and kitchen.
o Open the building and turn on plumbing in the spring. Winterize plumbing in the fall.
• Perry Warming House
o Inspect roof.
o Sanitize and deodorize interior rubber flooring.
• Freeway Warming House
o Roof inspection
o Pressure wash exterior. Spot replacement of the siding, soffits, fascia and paint exterior.
o Sanitize and deodorize interior rubber flooring.
• Floral Park Ball Field Drain Tile
o A plan for installation, including budget amount to be added to the 2025 budget.
Hard Court maintenance at each location below-
• Cummings Park, double tennis court and attached basketball court.
o Install tennis nets, remove debris, crack fill courts (contractor).
• Arden Manor Park, basketball court
o Reconstruction potentially in 2024
• Royal Park, tennis and basketball court
o Install tennis nets, remove debris, crack fill (contractor).
• Floral Park, tennis and basketball court
o Reconstructed in 2023, play surface striping to be installed 2024 by contractor.
• Hazelnut Park, tennis and basketball court
o Install tennis nets, remove debris
o Scheduled for 2025 pavement rehabilitation
• Arden Oaks, basketball court
o Install tennis nets, remove debris, crack fill (contractor).
o Scheduled for 2025 pavement rehabilitation
• Freeway Park, basketball court
o Scheduled for pavement rehabilitation in 2025.
• Ingerson Park, basketball court
o Pressure wash and crack fill court (contractor)
11
Pleasure and hockey rink maintenance typically begins in November to build ice, with the goal of having
a solid ice base in time for the holiday season. Prior to establishing ice, PW staff completes the below
items to prepare for skating season.
• Coordinate delivery and electrical connection to Hazelnut skating rink.
• Inspects, cleans, and delivers needed supplies to the warming houses.
• Inspect and repair rink lighting, damaged hockey boards, back stops, and grade inside the rink if
needed.
• Gather quantities and budget numbers for a full replacement of the hockey boards at Perry
Park. The hockey boards are approaching the end of useful life and can be considered for full
replacement in 2025 pending Council approval.
Once ice is established, PW cleans and floods the ice daily, Monday – Friday. PW coordinates with the
Recreation Manager to ensure the warming houses are staffed with attendants during rink hours.
Hazelnut Park Sledding Hill – Added in 2023, Public Works will continue to maintain this space for
sledding activities in the winter months. Maintenance includes brush/tall grass cutting and removal of
woody vegetation.
PTRC-Inspired Projects
• Per Council direction, at the March 11, 2024 Work Session, PW will coordinate the installation of
automatic door locks at Perry Pavilion restrooms. The management of this newly installed
system will be evaluated for efficiency and maintenance needs.
Potential Volunteer projects:
• Park bench cleaning
• Buckthorn removal, small plant pulling.
• Install sealer on gaga ball pits. Hazelnut, Cummings, Arden Manor, Floral.
• CNP natural wood chip installation on trails
• Weed/ replant as needed gardens at Johanna Marsh Park.
• Weed play structure mulch
• Replace one tree at South Shore Park
Citywide municipal trail inspections – Public Works will inspect the entire City trail system and update
the condition ratings to assist in planning for maintenance repairs and rehabilitation schedule.
12
Miscellaneous Carryover Projects from 2023
• Install new Floral Park sign at the Royal entrance, this will be completed once the Floral Park
Improvements project is complete.
• Perry Pavilion interior painting project and roof replacement was not completed.
• Perennial gardens plant infill as needed.
• Park bench inspection and maintenance within Cummings and Floral Parks.
• Perry Pavilion roof replacement by contractor spring 2024. The City Council approved replacing
with a steel roofing product.
13
2024 Streets Maintenance Plan
The map below outlines the Coon Rapids JPA project for 2024
14
Pothole Patching – Public Works fills potholes citywide twice annually. Operations begin as
temperatures start to rise at the end of winter and potholes begin to form. In the early weeks, Public
Works will use a “cold-mix” type of fill material to fill in severe potholes until bituminous plants open
(usually late March/early April) and we can purchase “hot-mix” material. The next full citywide pothole
patching operations will happen in the fall to prepare for winter plowing. Throughout the summer
months Public Works will address potholes as they are noticed or reported.
Spot mill and patching will be completed by PW staff within the orange highlighted streets on the map
below. This work is in preparation for the 2025 seal coating/crack filling maintenance project. The
projected 6-year street maintenance cycle is primarily for sealcoat and crack filling maintenance
planning.
15
Mill and Pave Operations – The map below outlines the streets recommended for large area patching
operations (stop gap maintenance) in 2024. The paving operations on Lake Valentine Rd, Red Fox Rd and
Grey Fox Rd are proposed to be contracted due to the higher volume of traffic and traffic control needs.
The trail segment at Cummings Park will be paved by PW staff.
16
Street Sweeping – Public Works performs street sweeping operations citywide twice annually.
Operations occur in the spring typically as the snow has melted away from the curb line and again in the
fall towards the end of leaves falling. Sweeping occurs as needed during the summer months primarily
as a result of storm damage. Street sweeping is a large contributor of improved water quality and also
included in our MS4 permitting process. If time allows, Public Works will perform an additional round of
sweeping in the fall within areas of heavy foliage.
• Create a map of the heavy foliage areas.
Snow and Ice Control – Review the Snow Plowing Policy as attached.
Vegetation Removal – Right-of-Way (ROW) tree trimming or tree removal if needed. This includes tree
limbs that could damage street maintenance equipment, public safety related trimming, and trees
blocking street signage. ROW ground cover mowing is completed along city owned boulevards and
utility easements to keep vegetation from growing over the roadway. Attention is also given as needed
to intersections where sight lines and motorist/ pedestrian safety is a factor.
Street Signage- The MUTCD requires cities to follow retro reflectivity guidelines per our adopted policy.
The city chose the replacement method-
“Expected Sign Life. The installation date is labeled or recorded when a sign is installed, so that the age
of any given sign is known. The age of the sign is compared to the expected sign life. The expected sign
life is based on the experience of sign retro reflectivity degradation in the City. Signs older than the
expected life will be replaced.”
Staff will utilize our current data to prioritize a small sign replacement project for 2024. In addition, a
replacement project will be created for 2025.
Pavement Markings – Street striping and symbols are maintained every other year. This work is typically
coordinated with Ramsey County and/or the JPA Coon Rapids project. An assessment of street symbols
will be completed in 2024 and added to the 2025 street maintenance plan. Streets with striping and
symbols within a PMP area are generally completed as part of the PMP contract.
Replace the split rail fencing along the Siems Court retaining walls.
17
2024 Water Distribution Maintenance Plan
Hydrant Servicing Area, Servicing hydrants includes- oiling the top operating nut, nozzle section (where
applicable), and nozzle threads/ caps. Checking for proper hydrant operation, flushing the hydrant,
inspecting the hydrant flag, and exercising the isolation gate valve.
Note: Approximately 20% of the hydrants from the 2023 service area were not serviced. These hydrants
are north of 694 and east of State Highway 10. These hydrants will be added to the 2024 servicing area.
Dead End Hydrant Flushing is complete citywide in conjunction with the hydrant servicing each year.
This flushing is necessary to remove stagnant water from the watermain system. The stagnant water
can give off an odor and have a discoloration if not flushed annually.
Gate Valve/ Curb Stop repairs needed are outlined below-
• 4353 Arden View Ct, curb box top damage and A-1 casting replacement in the private driveway.
• 4343 Arden View Ct, curb box top damage and A-1 casting replacement in the private driveway.
• 1201 Cummings Park Dr, gate valve top section replacement in the roadway.
• 4100 Hamline Ave (Boston Scientific) service gate valve replacement due to valve not holding
when in the off position. PW is recommending relocating the gate valve within the boulevard/
out of the roadway, and abandon the current service valve until removal can be added to a
future road project.
18
2024 PMP watermain replacement will require PW assistance with utility locating, watermain shut
downs, and misc. contractor assistance as needed per the onsite inspector.
2026 PMP watermain inspections - Public Works will be inspecting all watermain elements within the
2026 PMP corridor to determine needs while developing and budgeting for that project. The 2026 PMP
is located around the Karth Lake neighborhood (inspection maps not currently created).
2021 PMP remaining Public Works items
• Review existing hydrants prior to the 2021 PMP improvements and upgrade with hydrant mod
kits as necessary.
• Raise hydrant GV boxes that are buried.
Citywide Watermain Condition Assessment – Public Works/Engineering need to create a citywide
watermain management plan to assist in future project planning, budgeting and to be proactive in
preventing watermain breaks which results in loss of service to the residents.
Hydrant Painting, targeting corroded hydrants with paint failure. Hydrant coating assessment will be
done during 2024 hydrant servicing and added to the 2025 PW Annual Work Plan. PW staff will begin
painting in 2024 within the area indicated below that was assessed in 2023.
19
Hydrant Winterizing
Red Top hydrants (43 hydrants citywide) are hydrants that have a plug at the elbow below grade. The
reason for the plug is normally because of a high level of ground water. The result of not checking a
plugged hydrant is the possibility of the barrel staying “wet” not draining, then freezing during the
winter months. A frozen hydrant barrel can cause damage to the hydrant and cause it to be inoperable
for use in the winter months.
Green Top hydrants (40 hydrants citywide) are similar to red top hydrants in the need to check for
ground water in the hydrant barrel, but these hydrants are not plugged. The ground water seeps into
the barrel and can cause the barrel to freeze during the winter months. PW staff measures the amount
of ground water in the barrel and adds the appropriate amount of a food grade anti-freeze. Like red tops
hydrants, if this process isn’t completed annually before the winter months the hydrant barrel could
freeze, damaging the hydrant and making it inoperable for use in the winter months.
Hydrant Winterizing Map
20
Hydrant road salt protection (red plastic bags) are generally installed in late fall and removed early
spring along County roads and higher volume city streets where more road salt is used for deicing during
the winter months.
Hydrant Vegetation trimming is completed generally along government areas that no not receive any
mowing and easements. This is completed on an as needed basis to aid in fire department use and as a
general maintenance practice. Hydrants on private property are the responsibility of the home owners.
Hydrant Snow Removal (along city property) Staff will assess and develop a map for implementation in
2024.
Water Monitoring and Sampling is required by the MDH. On a monthly basis, 10 predetermined sample
sites are visited and a water sample is collected to test for Bacteria and Chlorine Residual. These
samples are coordinated through Pace Analytical and results are submitted on the city’s behalf to MDH.
Additional sampling is collected quarterly by PW staff and submitted directly to the MDH. The MDH also
requires annual, the Consumer Confidence Report be mailed to property owners in July. This
information is gathered by and mailed with the utility bill sent by the Utility Billing Department.
Every 3 years, the MDH requires Lead and Copper sampling from 20 locations citywide. This process was
last completed in 2022.
Lead/Copper Rule Inventory - All Public Water Systems must complete and submit to the state a lead
service line inventory by October 16, 2024. Public Works will be assisting by gathering data and
performing site inspections as-needed.
Booster Station Routine Maintenance and Inspections are completed as follows-
• Daily- checking pump run times. This aids in diagnosing any pump related issues proactively.
• Monthly- greasing pumps
• Monthly- Inspection and test run the diesel-powered standby generator and auto transfer
switch. The key items inspected are, fluid levels, starting battery, battery charging system,
coolant circulator (assists in cold weather starting), fuel level, and the overall condition of the
site/ enclosure. Ensuring the equipment is secure and ready for emergency service.
• Perform condition assessments to determine any future rehabilitation needs.
• Prepare 2025 Capital Project needs
21
Water Tower Maintenance and Inspection. Shown below is a routine list of items to be completed at
each water tower.
• Daily inspection of telemetry readings (tower levels). Intrusion alarms on tower entry doors are
also monitored.
• Grounds maintenance, mowing, trimming, tree trimming and snow plowing.
• Repairs and painting are needed to the wood fence at the North Tower. This will be coordinated
with the Cell Provider per the lease agreement.
• Current guidelines recommend a full inspection (float down inspection) of the tower structure,
coatings, and OSHA safety requirements every 5 years. This includes draining the tower to
roughly 50% and completing a thorough inspection of the wet area. The remainder of the tower,
referred to as the dry area is also inspected. Both our towers are with steel, corrosion is a large
concern. Correcting the coating/ paint early prevents costly future repairs.
o The North Tower repainting project, final warranty repairs were completed in 2021. The
next float down inspection is expected in 2026.
o The evaluation completed by BSI for the South Water Tower was review and
recommendations were presented to Council for spot paint repairs and security
additions. PW staff will coordinate as needed with a contractor on this project.
Water Distribution Repairs and Restoration to be complete at the following locations-
• Harriet Ave (approx. 50’ west of east Benton Way access) – restoration of a 10’ x 10’ asphalt
patch.
• 4421 Arden View Ct – Small asphalt patch and soft scape restoration.
• 1134 Hunters Ct - Restoration will include a 10’x20’ asphalt patch.
• Harriet Ave (approx. 200’ west of the east Benton Way access) – This restoration will be larger
due to the severity of the water leak. We will replace asphalt from the curb to centerline by 20’
long.
Gate Valve Exercising to be completed on valves that were installed in 2003 and newer. The process of
gate valve exercising is important for the overall functionality of our water distribution system. PW staff
ensures that the valve box is clean of debris, accessible to operate and the valve fully opens and closes
without leaking. Operating the valve also removes deposits that build up along the gate guides.
Exercising valves is a proactive method to ensure the valves will function properly when needed during
emergency watermain repairs.
• Update current gate valve history map, last update was done in 2013.
Emergency Water Distribution System Repairs are not something we schedule, but it’s important to note
in the annual work plan. In 2022 PW staff responded to 9 emergency repairs and 3 repairs that were
able to be scheduled shortly after identifying the problem. Excavations uses staff time both before and
after the actual repair. Many factors are taken into consideration such as- assessing public safety,
property loss, staffing, equipment needs, time of day, weather conditions, property owner needs, and
public notification.
22
Water Distribution related appointments or emergency response throughout the year.
• Water OFF/ON Contractors and property owners notify PW as the utility operator to shut city
water service off to building, sites throughout the year. This can be for either emergency or
scheduled repairs on the buildings plumbing or private watermain system within a larger
campus.
• Water meter service and new installations are the responsibility of PW and are generally
scheduled by the contractor or property owner. As the city’s water meter reading equipment
ages, so does the functionality of the equipment. PW works with Utility Billing to schedule
service appointments with accounts that are intermittently or no longer sending a reading. Our
vendor (Badger) has provided a solution to upgrade existing equipment on an as needed basis to
cellular end points (meter reading equipment). The installation and programming of the
updated equipment (located inside of the property or building) is performed by PW staff.
• Flow testing is conducted by contractor or engineering firm onsite to take measurements of
actual water flows. This is usually done for the purposes of fire suppression design within a
building. PW coordinates this work and operates the appropriate hydrant, or hydrants,
identified by the PW Superintendent and the project engineer.
• Private water service inspections are completed by PW staff and are prompted by a utility repair
permit.
• Gopher State One Call (GSOC) Utility Locating is mandated by law and completed during the
normal work week. There are cases where an “emergency” locate is needed, PW on-call staff
respond outside of normal work hours.
o PW staff are responsible for locating and marking city-owned watermain, sanitary
sewer, storm sewer, irrigation, electric, and/or fiber optic lines.
o In 2022, PW received 1,930 GSOC Utility Locate request tickets.
23
• Emergency City Interconnect are located in 3 locations. The below map indicates 2 connections
to the City of Shoreview and 1 connection to the City of New Brighton. Maintenance of the
interconnect is performed every 3 years.
o Prepare improvements for the New Brighton interconnect, coordinate with the City of
New Brighton. Plan for work to be performed in 2025.
o Review condition and assess plan for the northern Shoreview interconnect.
o Perform maintenance on southern Shoreview interconnect, coordinate with Shoreview.
24
• Pressure Reducing Valves (PRV) are located at each of the water meter structures that supply
water to the private water system within the Arden Manor property. PRV’s are scheduled for
routine maintenance every 5 years. The PRV’s were installed in 2019 and are due for
preventative maintenance in 2024. The location of the PRV’s are shown on the map below.
25
2024 Sanitary Sewer Maintenance Plan
The 2024 sewer cleaning and televising will be located within the south west third of the city. Per the
city’s sewer maintenance policy and guidelines provided by the LMC, below are the cleaning and
televising intervals.
• VCP clean or televise every 3 years. Root cut with hydraulic attachment and proofer as needed.
Televising will be saved on the cities network drive and can determine if cleaning or root cutting
is needed within a VCP mainline. Any mainline cleaning data is saved in the field to the cities GIS
database through a mobile application.
• CIP and RCP will be televised and determined if hydraulic cleaning and or root cutting is needed.
• PVC and CIPP clean and spot televise every 5 years. Dead ends can be flushed using the tanker
to “quick dump”. This will be recorded as the mainline is “clean” up to 2 Line segments
downstream.
• The city is divided in one-third sections. For example, in 2024 PW staff will complete the south
west third of the city. This cycles cleaning and televising efforts on a 3-year cycle to clean all VCP
(Category 2 sewer mains). While working in the south west third, PW staff also assess category 1
and 3 for cleaning needs.
26
Televising Trailer Equipment:
27
Jet-Vac Equipment:
28
Sanitary Sewer Manhole Inspections are completed within the third of the city that is being cleaned
each year. Below are a few items that Staff are looking for during a manhole inspection. Through
inspection activities, a report is prepared annually to evaluate maintenance activities and goals for
future projects.
• Adjusting rings, mortar, or any other concrete repairs needs.
• Evidence of inflow and infiltration (I and I)
• Tree root intrusion and the overall condition of the structure.
Annual Sanitary Sewer Cleaning-
• The below 4 maps outline the sanitary sewer segments (shown in green) that PW cleans on an
annual basis due to excessive buildup, low flow, or flat grade that causes the line to require
additional service each year.
29
Sanitary Sewer Lift Stations Preventative Maintenance (14 stations)-
• Daily lift station checks by PW Staff.
Performed in the spring and fall each year- Clean wet wells, remove grease, solids, and organics from
floats, transducers, pumps, rails, walls and floors. Remove pumps and inspect tolerances, vlutes,
impellers, flush valves (where applicable) motor oil or coolant levels and quality. Create a plan for any
part replacement needs as needed during inspection and make needed repairs. Test all alarms and verify
the monitoring system is functioning properly. Inspect the control panel and report any issues in overall
condition and functionality.
Lift Station Location Maps
30
Sanitary Manhole Rings replacement, reset casting and pave. (casting and lid replacement if needed)
• MH A-165 (replace adjusting rings and casting)
• MH 13-008 (buried under asphalt patch)
• MH A-264 (Fix issue with cover)
• MH A-282 (Cover under seal coat)
• MH A-247A (Replace cracked casting)
• MH A-211 (Remove and address tree roots in structure)
• MH A-263 (Address infiltration above upstream pipe)
• MH A-047 (Plastic ring at casting is deformed)
• Manhole inspections process, sanitary manholes will be inspected within the 2024 sewer
cleaning area in conjunction with televising or cleaning mainlines. Identified structures needing
repairs will be added to the 2025 PW Maintenance Plan.
• PMP Projects
• Grey Fox Rd/Dunlap St. MH 8-222
• Prioritize the Red Fox/Grey Fox area per the below map sanitary and storm sewer repairs as this
work was not completed in 2023. This work will be done prior to the “stop gap” paving project
within this area.
31
Preventative Maintenance mud MH adjusting rings within the below structures-
• MH 5-027
• MH A-188
• MH A-166
• MH A-168
• MH A-158
• MH A-157
• MH A-138
• MH A-137
• MH A-105
• MH A-106 (also check for lid replacement needed)
• MH 13-021 (PMP scheduled for 2026. Mud rings for now.)
Lift Station 5 Forcemain and valve vault improvements
Staff is working with Bolton & Menk to design and coordinate construction, rerouting the forcemain for
lift station 5. The new location will follow County Rd E west to the Elmer Anderson trail and discharge
into a rebuilt manhole at Stowe Ave and New Brighten Rd.
Lift Station 2 Improvements
The lift station improvements include pump replacement, guide rails, wet well plumbing, and floats/
transducer replacement.
Mainline Tree Root Treatment
We will be combining a small list from 2023 to the 2024 list for a contractor to complete chemical root
treatment. This process aids in tree root growth, stunting the growth for a period of time. In addition,
our crew saves time by reducing the need to hydraulically cut the roots from the pipes.
2026 PMP sanitary sewer inspections - Public Works will be inspecting all sanitary sewer elements within
the 2026 PMP corridor to determine needs while developing and budgeting for that project. The 2026
PMP is located around the Karth Lake neighborhood (inspection maps not currently created).
32
Sanitary Sewer Lining in 2024. The map below shows the proposed segments to be lined due to the
condition of the existing 8-inch VCP pipe and numerous locations of tree root intrusion.
33
Manhole Inflow and Infiltration (I&I) was identified within the below manholes located on the east side
of State Highway 10. This ditch south of Highway 96 is usually very wet. The City Engineer will review
options to seal the structures. Some potential options are grouting, epoxy coatings, excavate and wrap/
seal from the outside of the structure.
• MH A-244
• MH A-243
• MH A-242
• MH A-241
Other candidates for MH sealing without excavation-
• MH A-211 (minor roots in MH)
Private sewer service inspections are completed by PW staff. Each inspection is triggered by a utility
repair permit.
Gopher State One Call (GSOC) Utility Locating is mandated by law and completed during the normal
work week. There are cases where an “emergency” locate is needed, PW on-call Staff respond outside of
normal work hours.
• PW staff are responsible for locating and marking city-owned watermains, sanitary sewers,
storm sewers, irrigation structures, electric and fiber optic lines.
• In 2023, PW received 2,146 GSOC Utility Locate tickets.
34
2024 Surface Water Maintenance Plan
Public Works Surface Water maintenance ensures the existing infrastructure and BMPs (Best
Management Practices) function properly by providing adequate drainage to prevent flooding and
debris capture to promote water quality.
Through inspections by Public Works staff performed in the fall of 2023, repairs needed are reported on
the plan sheets attached. To perform inspections and plan for 2025 repairs, there will be the occasional
need to remove/clear vegetation and trees within easement areas. Notices will be sent to affected
properties providing them information of what the work is for and a timeline of activities.
BMP’s include:
• Rain Gardens
• Detention or Retention Ponds
• Grit Chambers
• Infiltration Basins
• Swales/Open Ditches (vegetated)
• Collection system – Catch basin, sewer mains
• Underground Storage Facilities
35
Rain Gardens – Typical maintenance activities include, pruning (spring/fall), replacing plants, adding
mulch, pulling weeds, removing sediment, removing trash and inspection. Per the Municipal Separate
Storm Sewer System (MS4) Permit, inspection of rain gardens should occur annually. Public Works needs
to develop an updated rain garden location map and create a plan for future maintenance. Current
maintenance is ordered “as-needed”, addressed with the Street Maintenance Plan areas or at rain
gardens in highly visible areas.
Surface Water Ponds – Maintenance activities include removal of excessive vegetation, removal of
trash/debris and removal of sedimentation or dredging. Adequate access must be provided for
inspection, maintenance, and landscaping upkeep, including appropriate access needs for equipment
and vehicles for when more extensive repairs are required. Primary issues we look for during inspections
is clogging of the inlets and outlet, weir structure condition, erosion and gulley formation,
sedimentation build up and undercut of adjacent roadways or trails. Per the MS4 Permit, inspection of
surface water ponds should occur once with each permit cycle which is typically 5 years. Public Works
needs to develop an updated surface water pond map and create a plan for future maintenance and
rehabilitation projects. Currently, pond maintenance and rehabilitation is included in the City’s PMP
projects.
Outfall condition Inspection – Following the MS4 Permit, the City is required to inspect every municipal
outfall (outlet/inlet) once with each permit cycle which is typically 5 years. Arden Hills currently has 439
outfalls inventoried so we will inspect roughly 90 structures each year. Through inspection, a report is
created to address condition, repairs needed, odor detection or inflow & infiltration concerns.
Grit Chambers – Public Works inspects and cleans every grit chamber annually. Grit chambers can be in
the form of a baffled structure, separated tanks or a simple sump style. It is important to clean these
structures more frequently as they are an important factor in promoting water quality by separating
sediment and other debris before reaching our water bodies. These are also typically installed directly
upstream from ponds to help reduce prolong the time needed for costly dredging activities. Public
Works is currently updating inventory of existing grit chamber structures.
Open Ditches & infiltration basins follow the same maintenance activities. Inspection for repairs or
erosion issues, remove debris and vegetation removal.
Catch Basins – Public Works conducts full structure inspections every 5 years to address any repair
needs. Issues to look for are inflow & infiltration, settling of surrounding pavement or curb, cracking of
interior structure concrete, drain tile cleaning and any blockage with flow.
Storm sewer mainlines – Inspection via televising camera is conducted on an as-needed basis. Full
inspections are completed prior to Pavement Management Program (PMP) projects to identify any
structural repairs needed.
Grading and Erosion Control Permit management – Following City Ordinance Chapter 15 (Erosion and
Sediment Control) along with MS4 requirements, construction site inspections are conducted for all land
disturbance activities for both residential projects and developments as defined within the ordinance.
These inspections ensure that the permit holder is staying in compliance with what is required for
erosion control and helps promote water quality.
Gopher State One Call locates for structures, sewer main along both City and County roads.
36
2026 PMP Stormwater Inspections – Public Works will be inspecting all stormwater elements within the
2026 PMP corridor to determine needs while developing and budgeting for that project. The 2026 PMP
is located around the Karth Lake neighborhood (inspection maps not currently created).
Culvert Rehabilitation at Chatham Open Space – Through inspections, Public Works has identified 4
culverts within the Chatham Open Space that are in need of rehabilitation. The amount of work is
substantial and will require planning and budgeting over 2024 to plan for the work to be done in 2025.
Carryover Projects from 2023 (Priority scheduling for spring/early summer for these projects)
• Catch basin repairs, and surface water repairs identified with a check mark have been
completed. The other items are remaining and will need to be completed spring of 2024 prior to
the large area patching project. This also includes some sanitary sewer manhole casting
adjustments.
37
• The map below outlines the projects related to the 2024 PMP that PW was unable to complete
in 2023. The two areas circled in black are possible contractor projects that would be
coordinated through PW. The other project on the map to be completed by PW spring/early
summer of 2024.
38
• The pond located at Cummings Park Dr and Lexington Ave was identified as needed the below
work done, sediment removal and outfall maintenance that was not completed in 2023.
• Parkshore Dr catch basins to be mudded. See the map below.
39
• The map below outlines the catch basins that need mudding, locate and expose a manhole, and
coordinate pond sediment testing with the ARMY for possible future dredging. The outfall
vegetation removal was completed by ICWC in 2023.
Surface water field inspection maps aid PW in completing the maintenance work in an organized
fashion. The maps below include the inspection results gathered in 2023, and are the proposed work
plan for surface water maintenance to be completed in 2024.
• PW will review the missing SAFL baffle within the CB on Glenview Ave that discharges to
Valentine Park.
40
41
Page 1 of 4
AGENDA ITEM – 3B
MEMORANDUM
DATE: August 19, 2024
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, Interim City Administrator
FROM: Joua Yang, Finance Director
SUBJECT: Preliminary 2025-2029 Capital Improvement Plan (CIP)
Preliminary 2025 General Fund Budget
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
Provide feedback on the Preliminary 2025-2029 CIP Plan.
Provide feedback on the Preliminary General Fund budget for the 2025 fiscal year. Background – CIP Plan
Annually, the City prepares a five (5) year Capital Improvement Plan for budgeting and
forecasting. The focus of the CIP is on the maintenance and protection of the City’s existing assets,
redevelopment, and investment in new initiatives. The CIP is part of the budget process, but it is
not a budget, it is a plan, and one that changes often. The CIP does not commit the Council to the
proposed projects, nor implement the assumptions made during the preparation; however, this is
the basis for the 2025 Budget as we continue with its preparation.
At the July 22, 2024 Special Work Session, Council discussed the preliminary CIP at length
(Attachment A) and today will be a continuation of that discussion. Since that initial discussion,
staff has made updates to various components of the CIP Plan, per Attachments B, that will be
discussed further.
Background – General Fund Budget
Annually, City staff prepares and submits a preliminary budget to the City Council for review and
feedback. Attached to this memo is the City’s preliminary General Fund budget for the 2025 fiscal
year. Each department provided their respective forecasts for this budget.
The proposed 2025 budget is $6,701,270, an increase of $580,349 or 9.5%. For the purpose of this
discussion, there is a 13.9% or $740,349 tax levy increase reflected in the budget, all for the General
Fund. As presented, the General Fund Budget is underfunded by $249,062 ($182,070 + $66,992),
which is more than the budget shortfall projected in the 2024 budget of $182,070. This practice is
not sustainable in the long term. A tax levy increase of 17.4% or $922,419 would be needed to
Page 2 of 4
balance the budget in 2025. The table below shows the amount the General Fund Budget is
underfunded at different tax levy increase amounts.
Tax Levy Increase Underfunded Amount
5% $656,872
10% $391,324
13.9% $182,070
17.4% $0
The preliminary 2025 property value data has not yet been provided by Ramsey County so no
projections can be made on our local tax rate at this time.
Wages and Benefits
The 2025 preliminary budget is currently being prepared which assumes a 3.0% wage adjustment
for all staff and a 4% market adjustment (for non-union employees) in anticipation of the
compensation study that will be completed yet this year. Below is a table showing the recent history
of approved COLA’s.
Year Non Union IUOE Union
2024
2023
3.00%
3.00%
3.00%
3.00%
2022 3.00% 3.00% + addition of Fleet Lead
2021 2.00% 3.00%
2020 3.00% Market adjustment; minimum increase was 5.80%
2019 2.50% 2.50%
2018 2.10% 2.25%
There is a 10.0% increase assumed for health, a 4.0% increase for dental, and a 0.0% increase for
life insurance premiums. The number of positions included in the budget remains unchanged from
2024.
Public Safety
2025 budget information was received from Ramsey County and the Lake Johanna Fire Department
for public safety.
POLICE
The police contract is expected to increase by 8.8% or $140,058 for 2025. Information provided
by Ramsey County on this increase is as follows:
The major cost drivers include:
• Labor contracts and increased costs related to employee health insurance.
• Increased costs related to county fees for insurance and administrative overhead/indirect
costs.
DISPATCH
Dispatch costs will be increasing by 4.5% or $3,180 for 2025.
Page 3 of 4
FIRE
The fire operating costs are expected to rise by 8.7% or $72,391 for 2025. This is mainly due to
the addition of 6 full time captains; step, COLA, and market adjustments; and an increase in repairs
and maintenance, all of which Arden Hills’ cost share portion is 24.2%.
The $740,349 tax levy increase being proposed for the General Fund is $524,720 more than the
increase needed to cover police and fire services, which makes up 29.1% of the proposed levy
increase or $215,629.
General Overview
There are no significant projects included in the 2025 budget which would affect the permit
revenue. The permit revenue included reflects only the estimated recurring “base” amount, similar
to what was included in the 2024 budget.
A summary of the major changes in the 2025 budget is as follows:
The table below shows the original adopted budget for the General Fund compared to the final
audited numbers from 2014 - 2023. As you can see, the City has performed better than the budget
for all the years shown. Reasons for this difference include conservative budgeting, which includes
not budgeting for position vacancies. Please note that the 2020 actuals include revenue from the
CARES Act in the amount of $459,614, and this was a one-time occurrence. The Transfers Out
column shows the funds that were transferred to cover capital projects within the City.
Description Effect on Levy
Transfer to Cable Fund 50,000
4% Market Adjustment 51,801
Step Increases and Position Changes 53,866
3% COLA Adjustments 49,734
Insurance/Work Comp Benefits 25,459
180,860
Increase in RamCo Sheriff 140,058
Increase in LJFD 72,391
Election Services 21,450
RamCo Facility Maintenance Facility - Rent 6,032
One-Time Comp Study Charge (17,500)
Street Maintenance Program 105,000
Permit Software Conversion 60,000
Net changes in other GF Budget Areas (37,942)
580,349
Personnel Costs
Total Costs
Page 4 of 4
Discussion
Staff is respectfully requesting the City Council to review the preliminary budget and provide
feedback for future budget meetings. The 2025 proposed levy and public meeting date need to be
set prior to the end of September 2024. Direction is needed from the City Council on the following
items:
• Current wage and benefit assumptions include a 3% COLA for both union and non-union staff,
a 4% market adjustment for non-union staff, 10% health insurance and 4% dental insurance
increases. Should any of these assumptions be changed?
• This preliminary budget does not include any significant building projects for 2025. Should a
building project be added?
• This preliminary budget contains a 13.9% levy increase. Is another work session needed to
further discuss the preliminary levy increase?
Attachments
A. Preliminary 2025-2029 CIP Budget Memo & PowerPoint Presentation
B. 2025-2029 CIP Changes (since 7/22/2024 Meeting)
C. Preliminary 2025 General Fund Budget PowerPoint Presentation
D. Preliminary 2025 General Fund Budget
Original Operating Transfers
Year Budget Activity Out
2014 (185,402) 142,649 (162,417)
2015 (58,305) 736,465 -
2016 (160,326) 427,521 (565,121)
2017 (195,955) 694,505 -
2018 (237,225) 101,055 (400,000)
2019 (186,970) 235,217 (360,000)
2020* (121,590) 642,918 (478,000)
2021 (90,720) 337,316 (548,000)
2022 (140,000) 298,955 (102,540)
2023 (160,760) 9,461 (171,140)
Page 1 of 4
AGENDA ITEM – 3B
MEMORANDUM
DATE: July 22, 2024
TO: Honorable Mayor and City Councilmembers
Dave Perrault, City Administrator
FROM: Joua Yang, Finance Director
SUBJECT: 2025 – 2029 Capital Improvement Plan (CIP)
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A Various
Council Should Consider
Provide feedback to staff on Preliminary 2025 – 2029 CIP Plan.
Background
Annually, the City prepares a five (5) year Capital Improvement Plan for budgeting and forecasting.
The focus of the CIP is on the maintenance and protection of the City’s existing assets,
redevelopment, and investment in new initiatives. The CIP is part of the budget process, but it is
not a budget, it is a plan, and one that changes often. The CIP does not commit the council to the
proposed projects, nor implement the assumptions made during the preparation; however, this is
the basis for the 2025 Budget as we continue with its preparation.
The city has a finite amount of resources, so prioritizing and then being able to finance projects is
crucial for ensuring the city’s long-term sustainability and being responsible stewards of the city’s
investments. Staff has been working on completing a comprehensive study of the City’s current
and future needs for infrastructure projects to better estimate project costs and ensure more accurate
forecasting of available fund balances.
Discussion
A preliminary plan has been prepared and is attached which includes a summary of projects,
detailed project sheets, sources of funds, and estimated fund balances (since the operating budgets
have not yet been completed, these fund balances are estimated operating costs). Information is
included on street and park projects going out ten (10) years even though our CIP is only for five
years. Please note that project timelines are subject to change and that the current timeline is City
Staff’s best estimate.
The 2024-2028 CIP was a $28.0 Million plan, while the proposed 2025-2029 CIP is listed for $29.8
Million in expenditures. This is a 6.4% increase from the previous year’s program or $1,792,519.
Attachment A
Page 2 of 4
The largest increases are in Parks, Public Safety, and Sewer, with the largest decrease in Street due
to the timing of biennial PMP street projects.
PIR Fund
• The city has about $60 million of streets and trails (based on 29.42 miles of city streets).
Estimating the useful life of these assets at 40 years would require an investment of about
$1.5 million annually. The current funding sources which consists of the tax levy, Municipal
State Aid and special assessments account for about $1.0M on average per year for 2025-
2029. This gap in the CIP fluctuates from year-to-year, but will need to be addressed over
time.
• A property tax levy of $250,000 is being proposed for 2025, which is unchanged from 2024.
Based on potential projects, this amount should be increased in future years to ensure there is
appropriate funding to meet future project expenditures.
• The city has been able to self-finance the special assessment portion thus far. However, with
the cost of these projects increasing, the City may need to eventually look into bonding for the
special assessment portion of street projects. Current projections include prepayments of
special assessments, which is based on a 5-year historical collection rate.
• There is not sufficient MSA funds to cover the projects included in the CIP for the next 10
years. Based on current projections, our MSA fund will be short by $3.36 million at the end
of 2033 and won’t be positive again until 2044.
• There is a definite need to stay on top of street improvement projects to ensure streets reach
their useful lives and don’t require costly premature full reconstructions. Several areas of the
city are reaching those crucial ages where significant outlay is needed to ensure the long-term
vitality of the streets.
• Projects were programmed to get the City on a schedule of completing a major street
reconstruction project every other year.
• The 3 types of street improvement projects being considered based on condition are:
o Resurfacing is the milling of the top 1.5 to 2 inch surface layer of street pavement and
overlaying the street with a new bituminous surface layer.
o Full Depth Reclamation involves spot repair of existing curb, milling or reclaiming the
full depth of existing bituminous pavement, blending milled material with underlying
aggregate material and installing a new bituminous pavement section.
o Reconstruction involves removal and replacement of larger quantities of existing curb,
installing underlying subgrade correction materials, new aggregate base and a new
bituminous pavement section.
• Future PMP projects included in the CIP (2030 and beyond) assume Full Depth Reclamation
will be required. Costs will decrease if Resurfacing is required and increase if Reconstruction
is required.
Public Safety Capital Equipment Fund
• The fund is currently being used to account for capital expenditures made by the Lake
Johanna Fire Department.
• The assumption being used for this CIP is that debt service on the new fire station will begin
in 2025 at $375,000 per year.
• Engine/ladder truck replacements are scheduled for 2027.
• The current $170,000 tax levy does not support the needs of this fund. The City will need to
determine if the City will 1) move forward with implementing a franchise fee and/or 2)
increase the tax levy to support the new fire station and anticipated future expenditures. A
Page 3 of 4
franchise fee proposal of $375,000 per year and a property tax levy of $220,000 per year, an
increase of $50,000 over 2024, is being provided to show appropriate funding levels in order
to meet future project expenditures.
• The one-time Public Safety Aid of $433,084 was received in 2023 and is accounted for in the
fund balance.
Equipment & Building Replacement Fund
• The current plan includes replacing the City Hall roof in 2025, replacing the City Hall air
handlers in 2028, and updating the City Hall building in 2029-2030.
• The current $100,000 tax levy does not support the needs of this fund. A property tax levy of
$210,000 is being proposed for 2025, which is an increase of $110,000 per year from 2024.
This change will ensure there is appropriate funding to meet future expenditures.
Utility Funds
• Public Works staff continues to evaluate the condition of City utilities throughout the
community. The majority of street projects currently include a minimum amount for isolated
utility repairs but these amounts could increase as locations are identified where broader
water, sanitary sewer and drainage replacement is needed.
• For the Sewer Fund, no I&I grant funds have been included in the plan as the amounts are
unpredictable.
• Rate increase assumptions are as follows:
Water – 2025-2033 (2%)
Sewer – 2025-2033 (3%)
Storm – 2025-2033 (3%)
Council Direction
Staff is seeking direction from the City Council regarding the following items:
2025 Projects
As we review the 2025 projects, does the Council have any questions, comments or concerns
about including them during budget preparation?
2025 Property Tax Levy
The levies for the Equipment/Building Replacement ($100,000) and Public Safety Capital
($170,000) funds are currently proposed to increase in this plan. What increases, if any, should
staff assume?
2025 Rate Increases - Enterprise Funds
A rate study was completed in 2018. Annually, staff performs a review to ensure rates are at an
appropriate level in order to meet future anticipated expenditures. Rate increase assumptions are
proposed in 2025 and in future years in order to maintain a positive fund balance across the three
funds. What changes, if any, should staff assume?
Local Government Aid (LGA)
The omnibus tax bill includes an $80 million annual increase in local government aid. Arden
Hills received $121,471 of LGA in 2024 and is expected to receive $122,592 in 2025. Staff
recommends that these funds are not used for general operations (the state has unallotted LGA in
the past) but instead direct them toward capital projects. They are included in the PIR Fund in
Page 4 of 4
this plan.
Does the Council have any change to where these funds are directed?
CIP Funding Update – Franchise Fees or Levy Increase
Included in this budget are franchise fee assumptions of $375,000 annually, estimated to start in
2025 to offset debt service for the new fire station. Does the Council want staff to move forward
with next steps towards implementing a franchise fee? And if so, what specific details should
staff consider (i.e. revenue target, rate class fee structure)?
Additional Funding Mechanisms
There are additional funding mechanisms available to cities to take some of the burden off of the
property tax levy. Options such as Local Sales Taxes can bring in monies from exempt properties
and non-property owners. During the 2023 legislative session, a moratorium was placed on local
sales tax authorizations through the 2025 legislative session.
Does the Council want staff to begin exploring additional funding mechanisms such as
Local Sales Tax?
Budget Impact
The Council should review the estimated fund balances and funding sources with special attention
given to the Equipment/Building Replacement and Public Safety Capital Funds.
When considering what tax levy increases are needed to support the capital funds, it should be
noted that preliminary results of department submissions and other assumptions have the General
Fund expenditures increasing by $502,771, which would equate to a 9.5% levy increase. This is
without taking into account any changes to the revenue budget from 2024. Attachment C gives a
preliminary snapshot of the increases being considered for the General Fund.
Attachments
Attachment A: PowerPoint Overview of Capital Improvement Plan
Attachment B: Capital Improvement Plan
Attachment C: Preliminary expenditure increases for 2025 General Fund Budget
Attachment D: Equipment Replacement Guidelines
Preliminary
2025-2029 Capital
Improvement Plan Budget
July 22, 2024
1
Summary of Capital Improvement Plan
Expenditures
The above table shows the City of Arden Hills’ estimated costs for capital projects
and equipment for the next five years broken down by department.
Department 2025 2026 2027 2028 2029 Total
Economic Development 270,000 0 40,000 0 0 310,000
Government Buildings 220,000 50,000 50,000 270,000 250,000 840,000
Parks Department 1,370,000 4,730,000 1,170,000 1,750,000 285,000 9,305,000
Public Safety Department 475,412 614,451 806,903 576,367 530,651 3,003,784
Sewer Department 1,325,000 185,000 840,000 0 860,000 3,210,000
Street Department 0 2,485,000 0 4,395,000 0 6,880,000
Surface Water Department 0 0 0 0 0 0
Water Department 1,796,500 1,132,000 295,000 20,000 0 3,243,500
Equipment 737,170 544,000 869,320 580,405 256,470 2,987,365
Total 6,194,082 9,740,451 4,071,223 7,591,772 2,182,121 29,779,649
CIP Expenditures by Year
Changes from Prior Year CIP
Expenditures
The above table shows the differences between the 2024-2028 CIP
and the 2025-2029 CIP by department.
The largest changes stem from updates to cost assumptions for Park
projects, LJFD new fire station revenue & debt payment
assumptions, and updates to the timing of PMP project expenditures.
3
Department 2023-2027 CIP 2024-2028 CIP 2025-2029 CIP Difference
Economic Development 310,000 310,000 310,000 0
Government Buildings 400,000 630,000 840,000 210,000
Parks Department 3,651,700 7,535,000 9,305,000 1,770,000
Public Safety Department 1,616,580 2,309,710 3,003,784 694,074
Sewer Department 1,940,000 2,657,500 3,210,000 552,500
Street Department 4,622,000 8,721,100 6,880,000 (1,841,100)
Surface Water Department 1,030,000 0 0 0
Technology 0 0 0 0
Water Department 2,340,000 2,757,500 3,243,500 486,000
Equipment 1,486,000 3,066,320 2,987,365 (78,955)
Total 17,396,280 27,987,130 29,779,649 1,792,519
Changes by Department
Projects in 2025
4
Department Project Fund Source Amount
Gateway Signs EDA 270,000$
Economic Development 270,000
Hard Court Rehabilitation Capital Improvement/Grants 540,000
Park Shelter Replacements Capital Improvement 170,000
Playground Structure Replacement Capital Improvement 300,000
Cummings Park Roof Maintenance Capital Improvement 45,000
Hazelnut Park Parking Lot Improvements Capital Improvement 315,000
Parks Department 1,370,000$
LJFD Rescue/Command/Utility Vehicle Replacement Public Safety 26,840
LJFD General Equipment Public Safety 56,956
LJFD Station Capital Public Safety 16,616
LJFD New Station Public Safety 375,000
Public Safety 475,412$
Lift Station Rehabilitation Sewer 910,000
Sewer Lining/Rehabilitation Sewer 415,000
Sanitary Sewer Department 1,325,000$
Water Meter Replacement Water 525,000
Water Tower Maintenance Water 250,000
Trunk Water Main Improvements - Roseville Water 900,000
Water System Model Update Water 41,500
Booster Station Improvements Water 80,000
Water Department 1,796,500$
Total Project Expenditures 5,236,912$
Projects shifted from 2024 to 2025:
•Arden Manor & Hazelnut Courts
•Water Meter Replacement
•Water Tower Maintenance
Equipment in 2025
5
Department Project Fund Source Amount Trade-In Net Amount
Trade in Program Toro Z Mowers #473 & #474 Equipment/Building Replacement 45,000 15,000 30,000
Replace 2012 Int'l Plow Wing Truck #115 Equipment/Building Replacement 180,170 30,000 150,170
Replace 1993 Case 621 Loader #103 Equipment/Building Replacement 300,000 25,000 275,000
Replace 2020 Bobcat Toolcat #461 Equipment/Building Replacement 80,000 25,000 55,000
Replace 2013 Ford F-450 Plow/Dump Truck #318 Equipment/Building Replacement 132,000 25,000 107,000
Equipment 737,170 120,000 617,170
City Hall Maintenance Equipment/Building Replacement 50,000 - 50,000
City Hall Roof Equipment/Building Replacement 170,000 - 170,000
Government Buildings 220,000 - 220,000
Total Equipment Expenditures 957,170 120,000 837,170
Expenditures shifted from 2024 to 2025:
•Trade in Program Toro Z Mowers #473 & #474
No other major changes from the 2024-2028 CIP.
Slight updates to cost assumptions to better reflect replacement costs in 2025.
BASELINE
Estimated Ending Fund Balance by Year
CIP Fund
•Includes Old Highway 10 (est. 2026) and Lake Johanna trails (est. 2028)
–Old Highway 10 Trail: Total Project Cost $4.1M; $1.3M City Share
–Lake Johanna Trail: Total Project cost $9.5M; $2.0M City Share
Public Safety Fund
•Includes new fire station starting in 2025
•No additional revenues source to offset new fire station bonding –Need
further direction from Council
Enterprise Funds
•Water revenue increase set to 2%
•Sewer & Surface water revenue increase set to 3%
6
Fund 2025 2026 2027 2028 2029
Capital Improvement Fund 2,490,889 251,981 152,934 (2,723,983)(2,060,363)
Economic Development Fund 479,770 493,948 465,552 474,503 480,724
Equipment Building Replacement Fund 165,362 165,862 (124,108)(398,838)(480,308)
Public Safety Capital Fund (9,116)(453,567)(1,090,470)(1,496,837)(1,857,488)
Sanitary Sewer Fund 89,836 278,147 122,569 331,492 454,930
Surface Water Fund 518,426 434,773 865,831 212,040 553,855
Water Fund 2,024,836 1,190,292 1,152,424 1,301,174 1,685,266
BASELINE
Net Fund Surplus (Deficit) by Year
PROPOSED
Estimated Ending Fund Balance by Year
7
Equipment Building Replacement Fund
•Levy proposal of $210,000 (+$110,000) annually
•Delay gateway sign project & transfer levy from EDA ($100,000) for 3 years to
supplement Equipment Fund?
Public Safety Fund
•Assumes franchise fee revenue source to offset new fire station bonding
($375,000 annually)
•Levy proposal of $220,000 (+$50,000) annually
A $160,000 levy increase would mean a 3% increase to a $5M levy budget
Fund 2025 2026 2027 2028 2029
Capital Improvement Fund 2,490,889 251,981 152,934 (2,723,983)(2,060,363)
Economic Development Fund 479,770 493,948 465,552 474,503 480,724
Equipment Building Replacement Fund 275,362 385,862 205,892 41,162 69,692
Public Safety Capital Fund 415,884 396,433 184,530 203,163 267,512
Sanitary Sewer Fund 89,836 278,147 122,569 331,492 454,930
Surface Water Fund 518,426 434,773 865,831 212,040 553,855
Water Fund 2,024,836 1,190,292 1,152,424 1,301,174 1,685,266
PROPOSED
Net Fund Surplus (Deficit) by Year
MSA Summary
8
MSA funds can only be used on Municipal State Aid Streets.
With an estimated $315,000 annual allocation, City projects should be
wholly funded by the beginning of 2044.
Year
MSA
Allocation Projects Balance Projects
2024 315,000 1,027,105 1,974,155 Roundabout & MVHS Trail
2025 315,000 700,000 2,359,155 Old Highway 10 Trail, Lake Valentine to Hwy 96
2026 315,000 100,000 2,144,155 2026 PMP
2027 315,000 - 1,829,155
2028 315,000 1,790,000 3,304,155 2028 PMP + Lake Johanna Blvd Trail ($1.49M)
2029 315,000 - 2,989,155
2030 315,000 500,000 3,174,155 2030 PMP
2031 315,000 - 2,859,155
2032 315,000 500,000 3,044,155 2032 PMP
2033 315,000 3,359,155
CIP Funding Update
•May 13 City Council Work Session
–April 20th Open House survey results shared with Council
–Staff shared analysis regarding impact to property owners
•Anticipated Capital Funding Gap estimated to be
$525K annually based on preliminary 2025-2029 CIP
Budget
•Additional Council Direction Needed
–Does Council want to move forward with a levy increase?
–Does Council want to move forward with implementing a
Franchise Fee?
9
CIP Funding Update –Cont’d
–Does Council want to move forward with implementing a
Franchise Fee?
•A separate public hearing is not required
•Where should these funds be directed to?
–Should this go towards the Public Safety Capital Fund –or-
–Should this go towards the new fire station only –or-
–Something else?
•Timeline
–Levy Increase: Set Preliminary 2025 levy at end of Sep 2024
–Franchise Fees: Adopt ordinance with Xcel Energy by Oct 1,
2024 for 2025 Implementation
10
Council Considerations
•Questions, comments or concerns about the projects for 2025?
•Levy increases are needed for Equipment purchases and the
Public Safety LJFD new station. What increases, if any, should
staff assume?
•Enterprise Funds
–Rate increases are reviewed annually, what changes, if any,
should staff assume?
•Fund Balances
•Is there a minimum fund balance Council would like staff to
target when reviewing annually?
•Explore additional funding mechanisms?
11
Rate Increase.Change from 3% to 9% -$787,158 over 5 years ($148,265 in 2025), to cover the
MetCouncil Wastewater increase of $100,000 in 2025 ($900K to $1,000,000) and project changes. The
following years assume a 3% increase to both revenue and expenditures -Should this be adjusted to
reflect future anticipated increases (estimated at 4-6%)?
•
ARPA. $136,436 remaining funding to be used in 2024•
Operating Expenses. Increase of ($560,111) over 5 years; ($100,000) in 2025, for MetCouncil
Wastewater Charge
•
2025: From $415,000 to $475,000 (increase of $60,000)○
2027: From $580,000 to $695,000 (increase of $115,000)○
Project Changes. Sewer Lining/Rehabilitation ($175,000) - expenditure changes due to updated pricing
assumptions
•
Sanitary Sewer Fund -+188,483 Change in Fund Balance
Moved from 2025 to 2026 and From $41,500 to $42,750 (increase of $1,250)○
Project Changes. Water System Model Update - expenditure change•
Water Fund -($1,250) Change in Fund Balance
Operating Expenses.$17,026 increase/year based on historical trend•
Surface Water Fund -($85,130) Change in Fund Balance
Grants. Hardcourt Rehabilitation ($10,000)•
Parks Master Plan. ($75,000)•
Hazelnut Park - $12,000 over 3 years or $4,000/year (2025-2027)○
Chatham NRMB - $26,125 over 5 years or $5,225/year (2025-2029)○
Hazelnut Park/Chatham NRMB, Floral Park. ($38,125)over 5 years•
Parks-PIR Fund -($123,125) Change in Fund Balance
Trade in Program Toro Z Mowers #473 & #474 - increase of ($3,000) in 2025 and decrease of $46,350
in 2028
○
Emergency Generator Replacement Schedule - delayed expenditures by one year (from 2025-2028 to
2026-2029)
○
Replace 2013 Ford F-450 Plow/Dump Truck #318 - increase of ($3,000) in 2025○
Replace 2018 Toro Large Area Mower #457 - increase of ($5,000)○
Project Changes. •
Equipment Fund -+$35,350
Levy set back to $200,000 in 2028 a ($40,000) total reduction (2028-2029)○
Levy Increase. $120,000 or $40,000 increase/year from 2024-2027, to help offset future captain salaries,
to be transferred to Operating Budget in future years
•
Charitable Gambling Increase. $150,000 over 6 years (2024-2029)•
2027: Transfer $160,000 (2024-2027) to General Fund to cover 4 years of captain salaries○
2028 - 2029: Transfer $100,000 to General Fund to cover 2 years of captain salaries○
Allocation Change from 24.4% to 24.2% equates to -$9,252 reduction over 5 years○
Expenditure Increase. $250,748•
Public Safety Fund -+$19,252 Change in Fund Balance
Charges for Services: 50% increase - PLACEHOLDER - New RFP in 2024 - $233,730 from $155,820 in 2024 •
Recycling Costs: 50% increase - PLACEHOLDER - New RFP in 2024 - $162,225 from $108,150 in 2024•
Does Council want to make any changes to these assumptions?•
Recycling Fund
2025-2029 CIP Changes (since 7/22/2024
Meeting)
Budget Page 1
Attachment B
EDA levy transfer (2025-2028)- $100K/year or $300K total to Equipment/Building Replacement
Fund, no impact to Levy
○
CIP•
2 Maintenance Leads (promotions), 1 Parks & Rec Manager, Consultants ($11K increase)□
Phase 1: $138K (Salary + Benefits)
1 Maintenance Lead (promotion), 1 Maintenance Worker (new)□
Phase 2: $113K (Salary + Benefits)
Public Works Staffing - Operating Budget Changes -($252,000) overall impact to Levy○
Operational•
Pending Items
Budget Page 2
Preliminary
2025-2029 Capital
Improvement Plan Budget
August 19, 2024
1
Summary of Capital Improvement Plan
Expenditures
The above table shows the City of Arden Hills’ estimated costs for capital projects
and equipment for the next five years broken down by department.
Department 2025 2026 2027 2028 2029 Total
Economic Development 270,000 0 40,000 0 0 310,000
Government Buildings 220,000 50,000 50,000 270,000 250,000 840,000
Parks Department 1,454,225 4,739,225 1,179,225 1,755,225 290,225 9,418,125
Public Safety Department 474,590 612,488 963,363 621,716 582,375 3,254,532
Sewer Department 1,385,000 185,000 955,000 0 860,000 3,385,000
Street Department 0 2,485,000 0 4,395,000 0 6,880,000
Surface Water Department 0 0 0 0 0 0
Water Department 1,755,000 1,174,750 295,000 20,000 0 3,244,750
Equipment 743,170 399,000 864,820 529,420 415,605 2,952,015
Total 6,301,985 9,645,463 4,347,408 7,591,361 2,398,205 30,284,422
CIP Expenditures by Year
Changes from Prior Year CIP
Expenditures
The above table shows the differences between the 2024-2028 CIP
and the 2025-2029 CIP by department.
The largest changes stem from updates to cost assumptions for Park
projects, LJFD new fire station revenue & debt payment
assumptions, and updates to the timing of PMP project expenditures.
3
Department 2023-2027 CIP 2024-2028 CIP 2025-2029 CIP Difference
Economic Development 310,000 310,000 310,000 0
Government Buildings 400,000 630,000 840,000 210,000
Parks Department 3,651,700 7,535,000 9,418,125 1,883,125
Public Safety Department 1,616,580 2,309,710 3,254,532 944,822
Sewer Department 1,940,000 2,657,500 3,385,000 727,500
Street Department 4,622,000 8,721,100 6,880,000 (1,841,100)
Surface Water Department 1,030,000 0 0 0
Technology 0 0 0 0
Water Department 2,340,000 2,757,500 3,244,750 487,250
Equipment 1,486,000 3,066,320 2,952,015 (114,305)
Total 17,396,280 27,987,130 30,284,422 2,297,292
Changes by Department
Projects in 2025
4
Projects shifted from 2024 to 2025:
•Arden Manor & Hazelnut Courts
•Water Meter Replacement
•Water Tower Maintenance
Projects highlighted in yellow updated since the 7/22/2024 Special Work Session
Department Project Fund Source Amount
Gateway Signs EDA 270,000$
Economic Development 270,000
Hard Court Rehabilitation Capital Improvement/Grants 540,000
Park Shelter Replacements Capital Improvement 170,000
Playground Structure Replacement Capital Improvement 300,000
Cummings Park Roof Maintenance Capital Improvement 45,000
Hazelnut Park Parking Lot Improvements Capital Improvement 315,000
Parks Master Plan Capital Improvement 75,000
Hazelnut Park & Chatham NRMB Capital Improvement 4,000
Floral Park NRMB Capital Improvement 5,225
Parks Department 1,454,225$
LJFD Rescue/Command/Utility Vehicle Replacement Public Safety 26,620
LJFD General Equipment Public Safety 56,489
LJFD Station Capital Public Safety 16,480
LJFD New Station Public Safety 375,000
Public Safety 474,590$
Lift Station Rehabilitation Sewer 910,000
Sewer Lining/Rehabilitation Sewer 475,000
Sanitary Sewer Department 1,385,000$
Water Meter Replacement Water 525,000
Water Tower Maintenance Water 250,000
Trunk Water Main Improvements - Roseville Water 900,000
Booster Station Improvements Water 80,000
Water Department 1,755,000$
Total Project Expenditures 5,338,815$
Equipment in 2025
5
Expenditures shifted from 2024 to 2025:
•Trade in Program Toro Z Mowers #473 & #474
No other major changes from the 2024-2028 CIP.
Slight updates to cost assumptions to better reflect replacement costs in 2025.
Department Project Fund Source Amount Trade-In Net Amount
Trade in Program Toro Z Mowers #473 & #474 Equipment/Building Replacement 48,000 15,000 33,000
Replace 2012 Int'l Plow Wing Truck #115 Equipment/Building Replacement 180,170 30,000 150,170
Replace 1993 Case 621 Loader #103 Equipment/Building Replacement 300,000 25,000 275,000
Replace 2020 Bobcat Toolcat #461 Equipment/Building Replacement 80,000 25,000 55,000
Replace 2013 Ford F-450 Plow/Dump Truck #318 Equipment/Building Replacement 135,000 25,000 110,000
Equipment 743,170 120,000 623,170
City Hall Maintenance Equipment/Building Replacement 50,000 - 50,000
City Hall Roof Equipment/Building Replacement 170,000 - 170,000
Government Buildings 220,000 - 220,000
Total Equipment Expenditures 963,170 120,000 843,170
Equipment in 2025
BASELINE
Estimated Ending Fund Balance by Year
CIP Fund
•Includes Old Highway 10 (est. 2026) and Lake Johanna trails (est. 2028)
–Old Highway 10 Trail: Total Project Cost $4.1M; $1.3M City Share
–Lake Johanna Trail: Total Project cost $9.5M; $2.0M City Share
Public Safety Fund
•Includes new fire station starting in 2025
•No additional revenues source to offset new fire station bonding –Need
further direction from Council
Enterprise Funds
•Water revenue increase set to 2%
•Sewer revenue increased from 3% to 9% in 2025, 3% in subsequent years
•Surface water revenue increase set to 3%
6
Fund 2025 2026 2027 2028 2029
Capital Improvement Fund 2,396,663 148,529 40,256 (2,841,887)(2,183,493)
Economic Development Fund 479,770 493,948 465,552 474,503 480,724
Equipment Building Replacement Fund 159,362 159,862 (129,958)(278,878)(442,416)
Public Safety Capital Fund 81,706 (335,782)(944,144)(1,323,861)(1,658,236)
Sanitary Sewer Fund 209,487 587,312 217,581 548,402 643,413
Surface Water Fund 502,392 402,223 816,269 144,957 468,725
Water Fund 2,066,336 1,189,042 1,300,524 1,299,774 1,683,866
BASELINE
Net Fund Surplus (Deficit) by Year
PROPOSED
Estimated Ending Fund Balance by Year
7
Equipment Building Replacement Fund
•Levy proposal of $210,000 (+$110,000) annually
•Delay gateway sign project & transfer levy from EDA ($100,000) for 3 years to
supplement Equipment Fund?
Public Safety Fund
•Assumes franchise fee revenue source to offset new fire station bonding
($375,000 annually)
•Levy proposal of $260,000 (+$90,000) annually; $40,000 to offset captain
salaries
A $160,000 levy increase would mean a 3% increase to a $5M levy budget
Fund 2025 2026 2027 2028 2029
Capital Improvement Fund 2,396,663 148,529 40,256 (2,841,887)(2,183,493)
Economic Development Fund 479,770 493,948 465,552 474,503 480,724
Equipment Building Replacement Fund 269,362 379,862 200,042 161,122 107,584
Public Safety Capital Fund 546,706 594,218 290,856 269,139 286,764
Sanitary Sewer Fund 209,487 587,312 217,581 548,402 643,413
Surface Water Fund 502,392 402,223 816,269 144,957 468,725
Water Fund 2,066,336 1,189,042 1,300,524 1,299,774 1,683,866
PROPOSED
Net Fund Surplus (Deficit) by Year
MSA Summary
8
MSA funds can only be used on Municipal State Aid Streets.
With an estimated $315,000 annual allocation, City projects should be
wholly funded by the beginning of 2044.
Year
MSA
Allocation Projects Balance Projects
2024 315,000 1,027,105 1,974,155 Roundabout & MVHS Trail
2025 315,000 700,000 2,359,155 Old Highway 10 Trail, Lake Valentine to Hwy 96
2026 315,000 100,000 2,144,155 2026 PMP
2027 315,000 - 1,829,155
2028 315,000 1,790,000 3,304,155 2028 PMP + Lake Johanna Blvd Trail ($1.49M)
2029 315,000 - 2,989,155
2030 315,000 500,000 3,174,155 2030 PMP
2031 315,000 - 2,859,155
2032 315,000 500,000 3,044,155 2032 PMP
2033 315,000 3,359,155
CIP Funding Update
•May 13 City Council Work Session
–April 20th Open House survey results shared with Council
–Staff shared analysis regarding impact to property owners
•Anticipated Capital Funding Gap estimated to be
$575K annually based on preliminary 2025-2029 CIP
Budget
•Additional Council Direction Needed
–Does Council want to move forward with implementing a
Franchise Fee?
–If so, what should Staff anticipate for an implementation date?
9
CIP Funding Update –Cont’d
–Does Council want to move forward with implementing a
Franchise Fee?
•A separate public hearing is not required
•Where should these funds be directed to?
–Should this go towards the Public Safety Capital Fund –or-
–Should this go towards the new fire station only –or-
–Something else?
•Timeline
–Levy Increase: Set Preliminary 2025 levy at end of Sep 2024
–Franchise Fees: Adopt ordinance with Xcel Energy by Oct 1,
2024 for 2025 Implementation
10
Council Considerations
•Questions, comments or concerns about the projects for 2025?
•Levy increases are needed for Equipment purchases and the
Public Safety LJFD new station. What increases, if any, should
staff assume?
•Enterprise Funds
–Rate increases are reviewed annually, what changes, if any,
should staff assume?
•Fund Balances
•Is there a minimum fund balance Council would like staff to
target when reviewing annually?
•Explore additional funding mechanisms?
11
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replace Two 2021 Toro "Z" Lawn Mowers #473 & #474 (parks).
#473 - 507 hours
#474 - 482 hours
These were last replaced in January 2022.
Cost of 2 machines: $40,930
Trade in values: -$15,000
Net cost of 2 machines: $25,930
Parts and labor costs:
#473 PM Repairs
2022 - $312.72 $115 $197.72
2023 - $1,230.12 $67 $1,163.12
2024 - $1,114 $197 $917
#474 PM Repairs
2022 - $182 $115 $67
2023 - $649.68 $67 $582.68
2024 - $1,651 $197 $1,454
Project #25-Eqo-001
Priority 3 Important
Justification
The trade in value of the Toro "Z" mowers is maximized if they are traded in with warranty still remaining. Due to the amount of time these pieces
of equipment are used during the summer months, they are traded in on a five-year cycle.
Major repair costs are under factory warranty.
Note: The new models will have a 5-year / 1,500 hour warranty.
Budget Impact/Other
Useful Life 5
Project Name Trade in Program Toro Z Mowers #473 & #474 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$144,914
Total2025 2026 2027 2028 2029Expenditures
48,00048,000Equip/Vehicles/Furnishings
48,000 48,000Total
Total2025 2026 2027 2028 2029Funding Sources
33,00033,000Equipment/Building
Replacement Fund
15,00015,000Trade-In Value
48,000 48,000Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Vehicle #103 - 1993 Case 621 Loader & Plow
Total Hours 3,630
Hour gauge:
2018 - 3,073
2019 - 3,344
2020 - Not available
2021 - 3,438
2022 - 3,501
2023 - Not available
2024 - 3,630
New Loader estimate - $225,000
Frontwing/Plow - $75,000
Project #25-Eqp-001
Priority n/a
Justification
Vehicle will be 32 years old.
This piece of equipment is used year round for loading trucks, stock pile management, and is a backup to our snow plow fleet. Also, during
emergencies, it is used for clearing trees to open roadways and access utilities. Due to its age, this loader is showing deterioration and some
significant corrosion. Replacement parts are hard to find and equipment is at end of life for wiring, hoses, and hyd seals. Staff recommends
replacement in 2025.
Parts and labor costs:
PM Repairs
2019 - $1,652
2020 - $2,361
2021 - $5,150; $1,070 $4,080
2022 - $2,220; $2,220 $0
2023 - $0
2024 - $0 Annual PM to be completed soon.
Duties for Loader:
Snow plowing
Wing back banks
Bucket snow in cul-da-sacs
PW shop materials handling
Storm damage management
Stuck equipment recovery
Useful Life 20-25
Project Name Replace 1993 Case 621 Loader #103 Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$300,000
Total2025 2026 2027 2028 2029Expenditures
300,000300,000Equip/Vehicles/Furnishings
300,000 300,000Total
Total2025 2026 2027 2028 2029Funding Sources
275,000275,000Equipment/Building
Replacement Fund
25,00025,000Trade-In Value
300,000 300,000Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replace 2020 Bobcat Toolcat #461.
Hours 705
Estimated auction return $25,000
Equipment may need to be replaced in 6 years.
Parts & Labor Costs:
PM Repairs
2023 - $1,725 $1,123 $602
2024 - $2,030 $190 $1,840
Project #25-Eqp-004
Priority 2 Very Important
Justification
PW currently owns 2 Toolcat's and the primary purpose is snow removal along sidewalks and park trails. During the winter months, the machines
are cleaned but salt and the heavy load out on the machine equates to costly repairs and down time. The machine is also used in the summer
months on a weekly basis.
Equipment repair costs from 2020-2024 total - $6,934
Toolcat Duties:
Daily rink cleaning/snow removal
Snow removal sidewalks/trails citywide
Push back snow banks
Trail sweeping
Fertilizing
Weed management/spraying
Tree removal operations
PW shop material handling
Street maintenance/paving
Budget Impact/Other
Time efficiency resulting in labor savings.
Useful Life 5
Project Name Replace 2020 Bobcat Toolcat #461 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$162,400
Total2025 2026 2027 2028 2029Expenditures
80,00080,000Equip/Vehicles/Furnishings
80,000 80,000Total
Total2025 2026 2027 2028 2029Funding Sources
55,00055,000Equipment/Building
Replacement Fund
25,00025,000Trade-In Value
80,000 80,000Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replace 2013 Ford F-450 Plow/ Dump Truck. This replacement would include plow, dump body and salt spreader with related controls.
Mileage 35,975
Estimated auction return $25,000
Project #25-EqpV-001
Priority 3 Important
Justification
This truck is used year round and a primary piece of equipment. Due to normal wear and corrosion factors, it's recommended for replacement
within the recommended 12 year window.
PM costs 2022 -$380; 2023 - $50; 2024 - $355
Repair costs from 2019-2024 total - $7,744
Budget Impact/Other
Reduced repair and maintenance costs.
Useful Life 10-12
Project Name Replace 2013 Ford F-450 Plow/Dump Truck #318 Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$135,000
Total2025 2026 2027 2028 2029Expenditures
135,000135,000Equip/Vehicles/Furnishings
135,000 135,000Total
Total2025 2026 2027 2028 2029Funding Sources
110,000110,000Equipment/Building
Replacement Fund
25,00025,000Trade-In Value
135,000 135,000Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Vehicle #115 - 2012 International Plow Wing Truck
Project #25-EqpV-002
Priority n/a
Justification
This item is a continuation for costs to build out the new plow wing truck.
Budget Impact/Other
Reduce repair and maintenance costs and improve reliability of our primary snow removal equipment.
Useful Life 10-12
Project Name Replace 2012 Int'l Plow Wing Truck #115 Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$180,170
Total2025 2026 2027 2028 2029Expenditures
180,170180,170Equip/Vehicles/Furnishings
180,170 180,170Total
Total2025 2026 2027 2028 2029Funding Sources
150,170150,170Equipment/Building
Replacement Fund
30,00030,000Trade-In Value
180,170 180,170Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replacement of the 2018 Toro large area mower.
2024 Hours 1,690
Project #26-Eqp-001
Priority 3 Important
Justification
The Toro large area mower will be 8 years old in 2026. This mower is a key piece of equipment for mowing operations. To avoid downtime, staff
recommends replacement prior to costly repairs.
Parts and labor costs (provided by AH PW crew):
2019 - $230
2020 - $739
2021 - $260
2022 - PM: $260
2023 - PM: $125
2024 - PM: $3,650; Repairs: $2,087
Budget Impact/Other
Useful Life 10-12
Project Name Replace 2018 Toro Large Area Mower #457 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$110,000
Total2025 2026 2027 2028 2029Expenditures
110,000110,000Equip/Vehicles/Furnishings
110,000 110,000Total
Total2025 2026 2027 2028 2029Funding Sources
90,00090,000Equipment/Building
Replacement Fund
20,00020,000Trade-In Value
110,000 110,000Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replace 1996 Redi-Haul trailer.
Estimated auction return $1,500
Project #26-Eqp-002
Priority 3 Important
Justification
This trailer is used mainly within the streets department to transport the asphalt roller and other miscellaneous equipment. The trailer is also used in
Parks frequently when not in Street Maintenance.
2022 - PM: $366; Repairs: $0
2023 - PM: $30; Repairs: $0
2024 - PM: $342; Repairs: $0
Budget Impact/Other
Useful Life 20
Project Name Replace 1996 Redi-Haul Trailer #108 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$18,000
Total2025 2026 2027 2028 2029Expenditures
18,00018,000Equip/Vehicles/Furnishings
18,000 18,000Total
Total2025 2026 2027 2028 2029Funding Sources
16,50016,500Equipment/Building
Replacement Fund
1,5001,500Trade-In Value
18,000 18,000Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Vehicle #215 - 2016 Ford F-350 Regular Cab with V-Plow and Liftgate (streets).
VIN # 3941
Mileage 51,708
Project #26-EqpV-001
Priority 3 Important
Justification
The pickup is used year round for Public Works operations but the primary use is plowing trails, sidewalks and parking lots. Due to plowing stress
and corrosion factors, staff recommends replacement at 10 years.
Parts and labor costs:
PM Repairs
2019 - $1,104
2020 - $ 989
2021 - $1,285
2022 - $1,408 $210 $1,198
2023 - $5,392 $120 $5,272
2024 - $ 730 $126 $ 604
Budget Impact/Other
Reduce maintenance and repair costs.
Useful Life 10
Project Name Replace 2016 F-350 w/V-Plow and Liftgate #215 Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$85,000
Total2025 2026 2027 2028 2029Expenditures
85,00085,000Equip/Vehicles/Furnishings
85,000 85,000Total
Total2025 2026 2027 2028 2029Funding Sources
70,00070,000Equipment/Building
Replacement Fund
15,00015,000Trade-In Value
85,000 85,000Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact City Administrator
2025 2029
thru Department Equipment
Description
Replace 2013 Ford Escape.
Mileage 65,000
Project #26-EqpV-003
Priority n/a
Justification
The current vehicle will be 13 years old and there is corrosion on the undercarriage. A multipurpose vehicle, like an Escape, will serve other City
employees when they want to use a City vehicle to attend meetings and conferences - especially when they are out of town.
Parts and labor costs:
2018 - $ 429
2019 - $1,205
2020 - $ 0
2021 - $ 530
2022 - $ 48 PM; $0 Repairs
2023 - $ 85 PM; $0 Repairs
2024 - $ 680 PM; $0 Repairs
Budget Impact/Other
Cost of maintenance.
Useful Life 10
Project Name Replace 2013 Ford Escape #504 Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$41,500
Total2025 2026 2027 2028 2029Expenditures
41,50041,500Equip/Vehicles/Furnishings
41,500 41,500Total
Total2025 2026 2027 2028 2029Funding Sources
33,50033,500Equipment/Building
Replacement Fund
8,0008,000Trade-In Value
41,500 41,500Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replace 2000 Case 590 Super L Backhoe.
Hours 3,336
Estimated auction return - $15,000
Project #27-Eqp-002
Priority 3 Important
Justification
This piece of equipment is used in streets, water, and miscellaneous needs department wide and around the PW Facility. Due to age and corrosion,
staff recomends replacment in 2027. The backhoe will be 27 years old.
Repairs costs 2019-2022 $7,956.
Budget Impact/Other
Useful Life 20-25
Project Name Replace 2000 Backhoe #204 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$172,010
Total2025 2026 2027 2028 2029Expenditures
172,010172,010Equip/Vehicles/Furnishings
172,010 172,010Total
Total2025 2026 2027 2028 2029Funding Sources
157,010157,010Equipment/Building
Replacement Fund
15,00015,000Trade-In Value
172,010 172,010Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
The water department, sewer department, and city hall standby power (EOC) utilizes a total of 4 standby generators ranging in model years (1999-
2005). This equipment is in need of a replacement schedule.
Estimated auction return is $5,000 each.
Project #27-Eqp-004
Priority 2 Very Important
Justification
Due to the emergency needs, factors like outdated technology, parts availability, dependability, and repair costs are taken into account with the
replacement plan. Additionally, stationary mount natural gas fueled generators are much more efficient and do not suffer from the reliability issues
seen with diesel fueled units. PW plans to replace generators on a priority basis.
Budget Impact/Other
Useful Life 20-25
Project Name Emergency Generator Replacement Schedule Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$463,635
Total2025 2026 2027 2028 2029Expenditures
463,635150,000 154,500 159,135Equip/Vehicles/Furnishings
150,000 154,500 159,135 463,635Total
Total2025 2026 2027 2028 2029Funding Sources
77,06877,068Equipment/Building
Replacement Fund
222,067145,000 77,067Sanitary Sewer Utility Fund
15,0005,000 5,000 5,000Trade-In Value
149,500149,500Water Utility Funds
150,000 154,500 159,135 463,635Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Community Devl Dir
2025 2029
thru Department Equipment
Description
Replace 2009 1,500 gallon tanker truck used for watering, sweeping, dust control and rink flooding.
Mileage 27,400
Project #27-EqpV-001
Priority 3 Important
Justification
Current vehicle will be 18 years old in 2027.
Corrosion due to winter operations and availability of parts.
Parts and labor costs:
2018 - $2,112
2019 - $2,618
2020 - $3,303
2021 - $2,060
2022 - $5,613 - PM: $600; Repairs $5,013
2023 - $ 323 - PM: $323; Repairs $0
2024 - TBD
Duties:
Watering trees/gardens
Filling garden barrels
Assisting with sewer cleaning operations
Pressure washing water source
Rink flooding
Assist with street sweeping
Budget Impact/Other
Useful Life 10
Project Name Replace 2009 Sterling Acterra Truck #431 Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$303,635
Total2025 2026 2027 2028 2029Expenditures
303,635144,500 159,135Equip/Vehicles/Furnishings
144,500 159,135 303,635Total
Total2025 2026 2027 2028 2029Funding Sources
278,635144,500 134,135Equipment/Building
Replacement Fund
25,00025,000Trade-In Value
144,500 159,135 303,635Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Vehicle #455 - 2016 Ford F-350 Crew Cab with Liftgate (parks).
VIN # 3955
Mileage 55,100
Project #27-EqpV-002
Priority 4 Less Important
Justification
The crew cab truck is used year round for efficiency with more staff seating. Seasonal staff can utilize one truck for up to 4 people. Due to rising
repair costs, the recommendation is to replace at 10-11 years.
Parts and labor costs:
2019 - $ 965
2020 - $ 486
2021 - $1,200
2022 - $1,408
2023 - $ 435
Budget Impact/Other
Reduce maintenance and repair costs.
Useful Life 10
Project Name Replace 2016 F-350 Pickup w/Liftgate #455 Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$84,975
Total2025 2026 2027 2028 2029Expenditures
84,97584,975Equip/Vehicles/Furnishings
84,975 84,975Total
Total2025 2026 2027 2028 2029Funding Sources
74,97574,975Equipment/Building
Replacement Fund
10,00010,000Trade-In Value
84,975 84,975Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replace 2015 Ford F-450 Plow/ Dump Truck. This replacement would include plow, dump body and salt spreader with related controls.
Mileage 31,300
Estimated auction return $25,000
Project #27-EqpV-003
Priority 2 Very Important
Justification
This truck is a primarily used year round for street route snow plowing, park maintenance, surface water repairs, and miscellaneous utility projects.
A 12 year replacement cycle is recommended for reliability and maximizing return on investment.
Repair costs through 2019-2023 total - $9,850
Budget Impact/Other
Reduced repair and maintenance costs.
Useful Life 10-12
Project Name Replace 2015 Ford F-450 Plow/Dump Truck #320 Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$144,200
Total2025 2026 2027 2028 2029Expenditures
144,200144,200Equip/Vehicles/Furnishings
144,200 144,200Total
Total2025 2026 2027 2028 2029Funding Sources
119,200119,200Equipment/Building
Replacement Fund
25,00025,000Trade-In Value
144,200 144,200Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replacement of a Bobcat Snowblower attachment used for snow removal along sidewalks, trails, parking lots, and miscellaneous snow removal
needs.
Estimated auction return - $2,000
Project #28-Eqp-001
Priority 3 Important
Justification
The attachment will be at the end of its useful life in 2028.
2019- 2023 repairs costs- $328
Budget Impact/Other
Useful Life 10-12
Project Name Replace Bobcat Snowblower 84" #118 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$9,270
Total2025 2026 2027 2028 2029Expenditures
9,2709,270Equip/Vehicles/Furnishings
9,270 9,270Total
Total2025 2026 2027 2028 2029Funding Sources
7,2707,270Equipment/Building
Replacement Fund
2,0002,000Trade-In Value
9,270 9,270Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replace walk behind pavement saw.
Hours- 110
Estimated auction return - $2,500
Project #28-Eqp-002
Priority 3 Important
Justification
This saw is used to cut asphalt and concrete for street patching and concrete repairs. In 2028, this equipment will be 19 years old and past its useful
life.
Repair costs between 2019- 2023- $1,300
Budget Impact/Other
Useful Life 15-17
Project Name Replace 2009 Husqavarna Pavement Saw #113 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$10,300
Total2025 2026 2027 2028 2029Expenditures
10,30010,300Equip/Vehicles/Furnishings
10,300 10,300Total
Total2025 2026 2027 2028 2029Funding Sources
7,8007,800Equipment/Building
Replacement Fund
2,5002,500Trade-In Value
10,300 10,300Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replace 1998 Leroi tow behind Air Compressor.
Hours 553
Estimated auction return - $1,500
Project #28-Eqp-003
Priority 3 Important
Justification
This piece of equipment is used for street and irrigation maintenance. In 2028, this equipment will be 30 years old and past its useful life.
Repair costs between 2019- 2022- $1,250
Budget Impact/Other
Useful Life 30
Project Name Replace 1998 Tow Behind Air Compressor #107 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$36,050
Total2025 2026 2027 2028 2029Expenditures
36,05036,050Equip/Vehicles/Furnishings
36,050 36,050Total
Total2025 2026 2027 2028 2029Funding Sources
34,55034,550Equipment/Building
Replacement Fund
1,5001,500Trade-In Value
36,050 36,050Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replace 2016 Stepp Asphalt Patch Trailer.
Estimated auction return - $25,000
Project #28-Eqp-004
Priority 3 Important
Justification
The patch trailer is used for street maintenance operations. This equipment will be 12 years old in 2028, near the end of its useful life and also with
a relativly high auction return.
Repair costs between 2019- 2022- $4,665
Budget Impact/Other
Useful Life 10-12
Project Name Replace 2016 Stepp Asphalt Patch Trailer #121 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$77,250
Total2025 2026 2027 2028 2029Expenditures
77,25077,250Equip/Vehicles/Furnishings
77,250 77,250Total
Total2025 2026 2027 2028 2029Funding Sources
52,25052,250Equipment/Building
Replacement Fund
25,00025,000Trade-In Value
77,250 77,250Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Vehicle #123 - 2017 Mack Single Axle Plow Wing Dump Truck (streets)
Mileage 14,200
Project #28-EqpV-001
Priority 5 Future Consideration
Justification
Due to long lead times for specking, ordering and taking delivery, staff recommends ordering the plow truck chassis in 2027 and doing the build
out in 2028. This will provide time to take delivery of a finished truck by 2029, making the current one 12 years old.
Repair costs for parts and labor:
2019 - $3,206
2020 - $4,557
2021 - $9,092
2022 - $8,443
2023 - $7,394
Budget Impact/Other
Reduce repair and maintenance costs and improve reliability of our primary snow removal equipment.
Useful Life 10-12
Project Name Replace 2017 Mack Plow/Wing/Dump Truck #123 Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$350,200
Total2025 2026 2027 2028 2029Expenditures
350,200154,500 195,700Equip/Vehicles/Furnishings
154,500 195,700 350,200Total
Total2025 2026 2027 2028 2029Funding Sources
315,200154,500 160,700Equipment/Building
Replacement Fund
35,00035,000Trade-In Value
154,500 195,700 350,200Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Replace 2019 F-150 Extended Cab 4x4 Pickup.
Mileage 23,100
Estimated auction return - $15,000
Project #28-EqpV-002
Priority 3 Important
Justification
The truck is used for miscellaneous use across departments within Public Works. In 2028, the truck will be 9 years old and at its useful life
expected.
Repair costs between 2019- 2022- $2,576
Budget Impact/Other
Useful Life 8-10
Project Name Replace 2019 Ford F-150 Ext Cab w/Toolbox #601 Category Vehicles
Type Equipment
TCAAP Yes
Total Project Cost:$46,350
Total2025 2026 2027 2028 2029Expenditures
46,35046,350Equip/Vehicles/Furnishings
46,350 46,350Total
Total2025 2026 2027 2028 2029Funding Sources
31,35031,350Equipment/Building
Replacement Fund
15,00015,000Trade-In Value
46,350 46,350Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Project #29-Eqp-001
Priority 4 Less Important
Justification
Budget Impact/Other
Useful Life 10-12
Project Name Replace Snowblower 72" #468 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$8,240
Total2025 2026 2027 2028 2029Expenditures
8,2408,240Equip/Vehicles/Furnishings
8,240 8,240Total
Total2025 2026 2027 2028 2029Funding Sources
8,2408,240Equipment/Building
Replacement Fund
8,240 8,240Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Project #29-Eqp-002
Priority 3 Important
Justification
Budget Impact/Other
Useful Life
Project Name Replace 2019 Bobcat Miller/Planer #129 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$16,480
Total2025 2026 2027 2028 2029Expenditures
16,48016,480Equip/Vehicles/Furnishings
16,480 16,480Total
Total2025 2026 2027 2028 2029Funding Sources
16,48016,480Equipment/Building
Replacement Fund
16,480 16,480Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Project #29-Eqp-003
Priority 3 Important
Justification
Budget Impact/Other
Useful Life 13-15
Project Name Replace 2012 Workman #445 Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$36,050
Total2025 2026 2027 2028 2029Expenditures
36,05036,050Equip/Vehicles/Furnishings
36,050 36,050Total
Total2025 2026 2027 2028 2029Funding Sources
36,05036,050Equipment/Building
Replacement Fund
36,050 36,050Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Project #29-Eqp-004
Priority 2 Very Important
Justification
Budget Impact/Other
Useful Life 5
Project Name Replace 2023 Bobcat Toolcat #Category Equipment: Public Works
Type Equipment
TCAAP No
Total Project Cost:$72,100
Total2025 2026 2027 2028 2029Expenditures
72,10072,100Equip/Vehicles/Furnishings
72,100 72,100Total
Total2025 2026 2027 2028 2029Funding Sources
47,10047,100Equipment/Building
Replacement Fund
25,00025,000Trade-In Value
72,100 72,100Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Project #29-EqpV-001
Priority 3 Important
Justification
Budget Impact/Other
Useful Life 10-12
Project Name Replace 2019 Ford F-150 #602 Category Vehicles
Type Equipment
TCAAP Yes
Total Project Cost:$46,350
Total2025 2026 2027 2028 2029Expenditures
46,35046,350Equip/Vehicles/Furnishings
46,350 46,350Total
Total2025 2026 2027 2028 2029Funding Sources
46,35046,350Equipment/Building
Replacement Fund
46,350 46,350Total
Produced Using the Plan-It Capital Planning Software
Capital Improvement Plan
City of Arden Hills, Minnesota Contact Public Works Director
2025 2029
thru Department Equipment
Description
Project #29-EqpV-002
Priority 4 Less Important
Justification
Budget Impact/Other
Useful Life 10
Project Name Replace 2019 Ford F-350 Crew Cab w/Tommygate Category Vehicles
Type Equipment
TCAAP No
Total Project Cost:$77,250
Total2025 2026 2027 2028 2029Expenditures
77,25077,250Equip/Vehicles/Furnishings
77,250 77,250Total
Total2025 2026 2027 2028 2029Funding Sources
77,25077,250Equipment/Building
Replacement Fund
77,250 77,250Total
Produced Using the Plan-It Capital Planning Software
Preliminary
2025 General Fund Budget
PRESENTED TO ARDEN HILLS CITY COUNCIL
AUGUST 19, 2024
1
$WWDFKPHQW&
Overall General Fund Budget Summary
2
2022 2023 7/26/2024 2024 2025 $ Increase % Increase
Actual Actual YTD Budget Budget (Decrease)(Decrease)
REVENUES
Taxes 3,829,079$ 3,963,077$ 1,883,744$ 4,638,460$ 5,170,015$ 531,555$ 11.5%
Special assessments - - - 3,090 - (3,090) -100.0%
Licenses and permits 830,864 471,740 242,153 552,020 550,540 (1,480) -0.3%
Intergovernmental 174,405 166,021 116,870 175,970 176,296 326 0.2%
Charges for services 615,878 485,643 236,577 489,490 475,064 (14,426) -2.9%
Fines & forfeits 22,662 24,681 14,149 19,250 17,360 (1,890) -9.8%
Investment earnings (186,632) 209,901 27,718 50,000 50,000 - 0.0%
Miscellaneous 215,708 31,734 21,908 10,920 13,282 2,362 21.6%
TOTAL REVENUES 5,501,964$ 5,352,798$ 2,543,118$ 5,939,200$ 6,452,557$ 513,357$ 8.6%
EXPENDITURES
General government 1,077,032$ 1,235,531$ 822,647$ 1,492,950$ 1,655,322$ 162,372$ 10.9%
Public safety 2,546,049 2,704,009 1,980,806 2,894,940 3,106,989 212,049 7.3%
Public works 914,150 682,508 305,524 853,380 993,770 140,390 16.5%
Parks & recreation 665,777 721,288 423,873 830,000 895,538 65,538 7.9%
Transfers out 102,540 171,140 - 50,000 50,000 - 0.0%
TOTAL EXPENDITURES 5,305,549$ 5,514,477$ 3,532,850$ 6,121,270$ 6,701,619$ 580,349$ 9.5%
NET CHANGE IN FUND BALANCE 196,415$ (161,679)$ (989,732)$ (182,070)$ (249,062)$ (66,992)$ 36.8%
Revenues by Source
3
2021 2022 2023 2024 2025 Amount Over(Under)% Change Over
Actual Actual Actual Budget Budget 2024 Budget 2024 Budget
Property Taxes 3,752,563$ 3,817,857$ 3,951,535$ 4,628,870$ 5,158,836$ 529,966$ 11.4%
Other Taxes 15,337 11,221 11,542 12,680 11,179 (1,501)-11.8%
Licenses and Permits 752,531 830,864 471,740 552,020 550,540 (1,480)-0.3%
Intergovernmental 160,279 174,405 166,021 175,970 176,296 326 0.2%
Charges for Services 605,738 615,878 485,643 489,490 475,064 (14,426)-2.9%
Fines and Forfeits 21,500 22,662 24,681 19,250 17,360 (1,890)-9.8%
Investment Earnings (13,315)(186,632)209,901 50,000 50,000 0 0.0%
Miscellaneous 9,958 215,708 31,734 10,920 13,282 2,362 21.6%
TOTAL REVENUES 5,304,591$ 5,501,964$ 5,352,798$ 5,939,200$ 6,452,557$ 513,357$ 8.6%
General Fund Revenues
4
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
Actual Actual Actual Budget Budget
2021 2022 2023 2024 2025
Mi
l
l
i
o
n
s
Expenditures by Department
5
2024 2025 Amount Over(Under)% Change Over
Budget Budget 2024 Budget 2024 Budget
General Government 1,492,950$ 1,655,322$ 162,372$ 10.9%
Public Safety 2,894,940 3,106,989 212,049$ 7.3%
Public Works 853,380 993,770 140,390$ 16.5%
Parks & Recreation 830,000 895,538 65,538$ 7.9%
TOTAL EXPENDITURES 6,071,270$ 6,651,619$ 580,349$ 9.6%
Expenditures by Type
6
2024 2025 Amount Over(Under)% Change Over
Budget Budget 2024 Budget 2024 Budget
Personnel Services 2,017,310$ 2,198,170 180,860$ 9.0%
Supplies & Materials 159,230 162,430 3,200 2.0%
Other Services & Charges 3,894,730 4,291,019 396,289 10.2%
TOTAL EXPENDITURES 6,071,270$ 6,651,619$ 580,349$ 9.6%
General Fund Expenditures
7
3.5
4.0
4.5
5.0
5.5
6.0
6.5
7.0
Actual Actual Actual Budget Budget
2021 2022 2023 2024 2025
Mi
l
l
i
o
n
s
Personnel Services
8
2024 2025 Amount Over(Under)% Change Over
Budget Budget 2024 Budget 2024 Budget
General Government 745,250$ 825,330$ 80,080$ 10.7%
Public Safety 327,380 331,380 4,000 1.2%
Public Works 381,130 419,820 38,690 10.2%
Parks & Recreation 563,550 621,640 58,090 10.3%
TOTAL EXPENDITURES 2,017,310$ 2,198,170$ 180,860$ 9.0%
4% Market Adjustment 51,801 29%
Step increases and position/allocation changes 53,866 30%
3% COLA 49,734 27%
Insurance Benefits 20,587 11%
Work Comp 4,872 3%
Total Changes 180,860 100%
Personnel FTE’s
No change over 2024 budget.
2024 Budget 2025 Request
General Government 5.86 5.86
Public Safety 2.80 2.80
Public Works 12.38 12.38
Parks & Recreation 4.46 4.46
Total 25.50 25.50
9
Supplies & Materials
10
2024 2025 Amount Over(Under)% Change Over
Budget Budget 2024 Budget 2024 Budget
General Government 24,180$ 21,180$ (3,000)$ -12.4%
Public Safety 1,250 1,250 - 0.0%
Public Works 65,500 66,000 500 0.8%
Parks & Recreation 68,300 74,000 5,700 8.3%
TOTAL EXPENDITURES 159,230$ 162,430$ 3,200$ 2.0%
Other Services & Charges
11
2024 2025 Amount Over(Under)% Change Over
Budget Budget 2024 Budget 2024 Budget
General Government 723,520$ 808,812$ 85,292$ 11.8%
Public Safety 2,566,310 2,774,359 208,049 8.1%
Public Works 406,750 507,950 101,200 24.9%
Parks & Recreation 198,150 199,898 1,748 0.9%
TOTAL EXPENDITURES 3,894,730$ 4,291,019$ 396,289$ 10.2%
Increase in RamCo Sheriff 140,058 67%
Increase in LJFD 72,391 35%
Increase in RamCo Dispatch 3,180 2%
Protective Inspections/Emergency Management (7,580) -4%
Total Public Safety Changes 208,049 100%
Tax Levy History
12
YEAR TAX LEVY % CHANGE TAX RATE % CHANGE
2015 3,359,775 3.1%27.294%-2.3%
2016 3,478,775 3.5%26.539%-2.8%
2017 3,641,290 4.7%27.211%2.5%
2018 3,786,942 4.0%25.532%-6.2%
2019 3,938,420 4.0%25.555%0.1%
2020 4,135,340 5.0%25.414%-0.6%
2021 4,280,080 3.5%25.089%-1.3%
2022 4,472,680 4.5%26.544%5.8%
2023 4,718,680 5.5%23.632%-11.0%
2024 5,310,950 12.55%24.479%3.6%
Proposed Tax Levy
A 0.5% change in the tax levy equates to $26,555.
13
Proposed Increase %
2021 2022 2023 2024 2025 (Decrease)Change
General Fund 3,760,080 3,902,680 4,098,680 4,650,950 5,231,299 580,349 12.5%
EDA Fund 100,000 100,000 100,000 100,000 100,000 - 0.0%
Capital Improvements
Equipment/Bldg Replacement 50,000 50,000 50,000 270,000 210,000 (60,000) -22.2%
PIR 250,000 250,000 250,000 250,000 250,000 - 0.0%
Public Safety 120,000 170,000 220,000 40,000 260,000 220,000 550.0%
Total Capital Improvements 420,000 470,000 520,000 560,000 720,000 160,000 28.6%
Debt Service - - - - - - N/A
TOTAL LEVY 4,280,080 4,472,680 4,718,680 5,310,950 6,051,299 740,349 13.94%
Change from previous year 3.5%4.5%5.5%12.6%13.9%
General Fund Tax Levy Assumptions
14
Description Effect on Levy
Transfer to Cable Fund 50,000
4% Market Adjustment 51,801
Step Increases and Position Changes 53,866
3% COLA Adjustments 49,734
Insurance/Work Comp Benefits 25,459
180,860
Increase in RamCo Sheriff 140,058
Increase in LJFD 72,391
Election Services 21,450
RamCo Facility Maintenance Facility - Rent 6,032
One-Time Comp Study Charge (17,500)
Street Maintenance Program 105,000
Permit Software Conversion 60,000
Net changes in other GF Budget Areas (37,942)
580,349
Personnel Costs
Total Costs
Budgeted vs Actual Activity
*2020 Operating Activity includes CARES Act revenue of $459,614.
15
Original Operating Transfers
Year Budget Activity Out
2014 (185,402) 142,649 (162,417)
2015 (58,305) 736,465 -
2016 (160,326) 427,521 (565,121)
2017 (195,955) 694,505 -
2018 (237,225) 101,055 (400,000)
2019 (186,970) 235,217 (360,000)
2020*(121,590) 642,918 (478,000)
2021 (90,720) 337,316 (548,000)
2022 (140,000) 298,955 (102,540)
2023 (160,760) 9,461 (171,140)
Other Funds Relying on Tax Levy Dollars
EDA Fund –Proposed tax levy to remain the same at $100,000.
Public Safety Capital Fund –Proposed tax levy set to $260,000. This includes a base levy of
$220,000 and $40,000 for City share of Fire Captains. There was a one-time levy transfer of
$220,000 to the Equipment/Building Replacement Fund in 2024.
Equipment/Building Replacement Fund –A replacement schedule was developed for all
City equipment. Based on the results, a tax levy increase of $110,000 is needed. Proposed
tax levy set to $210,000.
PIR Fund –The new Local Government Aid (LGA) is directed to this fund. More revenues
will eventually be required to support City infrastructure projects. Proposed tax levy to
remain the same at $250,000.
16
Council Feedback
•Current wage and benefit assumptions include a 3% COLA, 4% Market
Adjustment, 10% health insurance and 4% dental insurance increases.
Should any of these assumptions be changed?
•This preliminary budget does not include any significant building projects for
2025. Should a building project be added?
•This preliminary budget contains a 13.9% levy increase. Is another work
session needed to further discuss the preliminary levy increase?
17
Council Feedback
Questions?
Comments?
Additional meetings?
Budget format?
18
2022 2023 7/26/2024 2024 2025 $ Increase % Increase
GENERAL FUND Actual Actual YTD Budget Budget (Decrease)(Decrease)
REVENUES
Taxes 3,829,079$ 3,963,077$ 1,883,744$ 4,638,460$ 5,170,015$ 531,555$ 11.5%
Special assessments - - - 3,090 - (3,090) -100.0%
Licenses and permits 830,864 471,740 242,153 552,020 550,540 (1,480) -0.3%
Intergovernmental 174,405 166,021 116,870 175,970 176,296 326 0.2%
Charges for services 615,878 485,643 236,577 489,490 475,064 (14,426) -2.9%
Fines & forfeits 22,662 24,681 14,149 19,250 17,360 (1,890) -9.8%
Investment earnings (186,632) 209,901 27,718 50,000 50,000 - 0.0%
Miscellaneous 215,708 31,734 21,908 10,920 13,282 2,362 21.6%
TOTAL REVENUES 5,501,964$ 5,352,798$ 2,543,118$ 5,939,200$ 6,452,557$ 513,357$ 8.6%
EXPENDITURES
Mayor & Council 53,060$ 71,926$ 52,479$ 88,370$ 93,819$ 5,449$ 6.2%
Administration 385,175 437,233 288,078 499,730 506,225 6,495 1.3%
Elections 33,947 31,056 18,440 40,300 61,750 21,450 53.2%
Finance 143,713 161,040 110,516 191,810 214,726 22,916 11.9%
TCAAP 47,817 77,657 72,476 114,900 120,350 5,450 4.7%
Planning & Zoning 199,219 227,805 143,255 324,940 418,490 93,550 28.8%
Government Buildings 214,101 228,815 137,404 232,900 239,962 7,062 3.0%
Police 1,452,262 1,491,764 923,422 1,585,240 1,725,298 140,058 8.8%
Dispatch 61,808 68,737 35,197 70,390 73,570 3,180 4.5%
Fire 696,675 751,177 833,933 833,930 906,321 72,391 8.7%
Emergency Management 6,622 8,587 3,179 9,260 9,680 420 4.5%
Protective Inspections 328,682 383,744 185,075 396,120 392,120 (4,000) -1.0%
Street Maintenance 914,150 682,508 305,524 853,380 993,770 140,390 16.5%
Recreation 178,808 176,655 97,361 241,970 250,358 8,388 3.5%
Park Maintenance 486,969 544,634 326,511 588,030 645,180 57,150 9.7%
Transfers out 102,540 171,140 - 50,000 50,000 - 0.0%
TOTAL EXPENDITURES 5,305,549$ 5,514,477$ 3,532,850$ 6,121,270$ 6,701,619$ 580,349$ 9.5%
NET CHANGE IN FUND BALANCE 196,415$ (161,679)$ (989,732)$ (182,070)$ (249,062)$ (66,992)$ 36.8%
$WWDFKPHQW'
2025 BUDGET - GENERAL FUND - SCHEDULE OF EXPENDITURES - DETAIL BY FUNCTION
2022 2023 2024 2025 $ Increase % Increase
Actual Actual Budget Proposed (Decrease)(Decrease)
Mayor & council
Personnel Expenses 37,225$ 37,231$ 37,240$ 41,070$ 3,830$ 10.3%
Supplies and Materials - - - - - 0.0%
Other Services and Charges 15,835 34,694 51,130 52,749 1,619 3.2%
53,060$ 71,926$ 88,370$ 93,819$ 5,449$ 6.2%
Administration
Personnel Expenses 247,988$ 264,777$ 301,980$ 318,270$ 16,290$ 5.4%
Supplies and Materials - - - - - 0.0%
Other Services and Charges 137,186 172,456 197,750 187,955 (9,795) -5.0%
385,175$ 437,233$ 499,730$ 506,225$ 6,495$ 1.3%
Elections
Supplies and Materials 68$ -$ -$ -$ -$ 0.0%
Other Services and Charges 33,879 31,056 40,300 61,750 21,450 53.2%
33,947$ 31,056$ 40,300$ 61,750$ 21,450$ 53.2%
Finance
Personnel Expenses 62,080$ 73,619$ 84,850$ 106,350$ 21,500$ 25.3%
Supplies and Materials 10,477 11,505 15,000 12,000 (3,000) -20.0%
Other Services and Charges 71,156 75,916 91,960 96,376 4,416 4.8%
143,713$ 161,040$ 191,810$ 214,726$ 22,916$ 11.9%
TCAAP
Personnel Expenses 37,020$ 39,431$ 43,900$ 50,350$ 6,450$ 14.7%
Supplies and Materials - - - - - 0.0%
Other Services and Charges 10,797 38,226 71,000 70,000 (1,000) -1.4%
47,817$ 77,657$ 114,900$ 120,350$ 5,450$ 4.7%
Planning & Zoning
Personnel Expenses 115,217$ 190,620$ 239,180$ 270,170$ 30,990$ 13.0%
Supplies and Materials - 123 - - - 0.0%
Other Services and Charges 84,002 37,062 85,760 148,320 62,560 72.9%
199,219$ 227,805$ 324,940$ 418,490$ 93,550$ 28.8%
Government Buildings
Personnel Expenses 35,823$ 38,713$ 38,100$ 39,120$ 1,020$ 2.7%
Supplies and Materials 8,056 10,786 9,180 9,180 - 0.0%
Other Services and Charges 170,221 179,316 185,620 191,662 6,042 3.3%
214,101$ 228,815$ 232,900$ 239,962$ 7,062$ 3.0%
Police
Other Services and Charges 1,452,262$ 1,491,764$ 1,585,240$ 1,725,298$ 140,058$ 8.8%
1,452,262$ 1,491,764$ 1,585,240$ 1,725,298$ 140,058$ 8.8%
Dispatch
Other Services and Charges 61,808$ 68,737$ 70,390$ 73,570$ 3,180$ 4.5%
61,808$ 68,737$ 70,390$ 73,570$ 3,180$ 4.5%
Fire
Other Services and Charges 696,675$ 751,177$ 833,930$ 906,321$ 72,391$ 8.7%
696,675$ 751,177$ 833,930$ 906,321$ 72,391$ 8.7%
Emergency Management
Personnel Expenses 5,161$ 5,164$ 7,710$ 8,030$ 320$ 4.2%
Supplies and Materials - - - - - 0.0%
Other Services and Charges 1,461 3,423 1,550 1,650 100 6.5%
6,622$ 8,587$ 9,260$ 9,680$ 420$ 4.5%
Protective Inspections
Personnel Expenses 268,552$ 279,459$ 319,670$ 323,350$ 3,680$ 1.2%
Supplies and Materials 1,553 662 1,250 1,250 - 0.0%
Other Services and Charges 58,578 103,623 75,200 67,520 (7,680) -10.2%
328,682$ 383,744$ 396,120$ 392,120$ (4,000)$ -1.0%
Street Maintenance
Personnel Expenses 317,000$ 337,706$ 381,130$ 419,820$ 38,690$ 10.2%
Supplies and Materials 66,755 59,540 65,500 66,000 500 0.8%
Other Services and Charges 530,395 285,261 406,750 507,950 101,200 24.9%
914,150$ 682,508$ 853,380$ 993,770$ 140,390$ 16.5%
Recreation
Personnel Expenses 123,795$ 126,476$ 161,380$ 175,230$ 13,850$ 8.6%
Supplies and Materials 14,553 15,360 23,400 22,250 (1,150) -4.9%
Other Services and Charges 40,460 34,818 57,190 52,878 (4,312) -7.5%
178,808$ 176,655$ 241,970$ 250,358$ 8,388$ 3.5%
Park Maintenance
Personnel Expenses 347,218$ 349,403$ 402,170$ 446,410$ 44,240$ 11.0%
Supplies and Materials 33,578 77,978 44,900 51,750 6,850 15.3%
Other Services and Charges 106,174 117,252 140,960 147,020 6,060 4.3%
486,969$ 544,634$ 588,030$ 645,180$ 57,150$ 9.7%
Transfers Out 102,540$ 171,140$ 50,000$ 50,000$ -$ 0.0%
TOTAL EXPENDITURES 5,305,549$ 5,514,477$ 6,121,270$ 6,701,619$ 580,349$ 9.5%
2024 PERCENT
ORIGINAL OVER(UNDER)
Total By Program ACTUAL ACTUAL BUDGET BUDGET 2023 BUDGET
City Council 53,060$ 71,926$ 88,370$ 93,819$ 6.2%
City Administration 385,175 437,233 499,730 506,225 1.3%
Elections 33,947 31,056 40,300 61,750 53.2%
Finance 143,713 161,040 191,810 214,726 11.9%
TCAAP 47,817 77,657 114,900 120,350 4.7%
Planning & Zoning 199,219 227,805 324,940 418,490 28.8%
Government Buildings 214,101 228,815 232,900 239,962 3.0%
Totals 1,077,032 1,235,531 1,492,950 1,655,322 10.9%
Total By Classification
Personnel Services 498,334 604,961 701,350 774,980 10.5%
Commodities 29,398 60,639 95,180 91,180 -4.2%
Contractual Services 512,279 530,501 652,520 738,812 13.2%
Capital Outlay 0 0 0 0 N/A
Other Charges 0 0 0 0 N/A
Totals 1,040,012 1,196,101 1,449,050 1,604,972 10.8%
Staffing
Full-time equivalents 3.76 4.38 4.98 5.29
Expenditures
CITY OF ARDEN HILLS, MINNESOTA
GENERAL GOVERNMENT SUMMARY
EXPENDITURE ANALYSIS
2022 2023 2025
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
ACTUAL
2022
ACTUAL
2023
BUDGET
ORIGINAL
2024
BUDGET
2025
Th
o
u
s
a
n
d
s
CITY OF ARDEN HILLS, MINNESOTA
Function:General Government 101
Activity:Mayor & Council 41100
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 37,225$ 37,231$ 37,240$ 41,070$
Commodities - - - -
Contractual Services 15,835 34,694 51,130 52,749
Total 53,060$ 71,926$ 88,370$ 93,819$
Percent Change 35.6% 22.9% 6.2%
NYFS amount included above - 16,661 23,304 24,469
Expenditures by Classification
In 2025,the Mayor and Council budget is proposed to increase by 6.2%or $5,449.The budget for NYFS was
added back in 2024.
2025 BUDGET
Fund # :
Activity # :
The Mayor and City Council are responsible for the formulation of policy and the passage of laws governing the
City of Arden Hills. Members participate in various committees, as well as direct staff, through the City
Administrator, as to their overall goals for the City. This department provides for Mayor and Council
compensation, Council meetings and work sessions, management consultants and memberships. When
applicable, participation in NYFS is included in this budget, as is funding for the City Council Retreat Facilitator.
1. Adopt policies and ordinances consistent with Council's position on growth, zoning and financial strategy.
2. Continue to work on the redevelopment of the TCAAP property.
Creating funding sources to build reserve balances to fund future capital improvements while maintaining current
City services.
44%
56%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:General Government 101
Activity:Administration 41300
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 247,988$ 264,777$ 301,980$ 318,270$
Commodities - - - -
Contractual Services 137,186 172,456 197,750 187,955
Total 385,175$ 437,233$ 499,730$ 506,225$
Percent Change 13.5% 14.3% 1.3%
Full-Time Equivalent positions 2.07 2.03 2.22 2.32
Expenditures by Classification
The 2025 Administration budget is increasing by 2.9% over 2024. The increase in personnel services is due to
step, COLA, insurance benefit increases and an increase in fte's. The decrease in contractual services is
primarily due to a one-time comp study that occurred in 2024.
2025 BUDGET
Fund # :
Activity # :
City Administration provides the overall direction of the City, as determined by the City Council. The City
Administrator serves as Chief Administrative Officer for the City, ensuring that laws, ordinances, and resolutions
of the City Council are enforced and implemented. The Administration Department is responsible for
administering Council policies, coordinating Council agendas, and providing support to other functional areas
within the City.
1. Assist City Council in setting policies and procedures in accordance with Council's position.
2. Provide direction and leadership on major city projects, budget management, oversee performance evaluations
and long-range planning.
1. Long-range planning to maintain current City services while creating funding sources for reserves.
2. Long-range comprehensive TCAAP planning.
63%
37%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:General Government 101
Activity:Elections 41410
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services -$ -$ -$ -$
Commodities 68 - - -
Contractual Services 33,879 31,056 40,300 61,750
Total 33,947$ 31,056$ 40,300$ 61,750$
Percent Change (-8.5%) 29.8% 53.2%
Expenditures by Classification
The Elections budget has a 53.2% increase for FY25.
2025 BUDGET
Fund # :
Activity # :
This department covers the cost of administering all Federal, State and Municipal elections. This includes the
preparation of any and all absentee ballots, organizing the polling places, election judges, and vote tabulations.
The City contracts with Ramsey County for all the required election services.
Stay current on election laws.
Stay current on election laws.
100%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:General Government 101
Activity:Finance 41500
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 62,080$ 73,619$ 84,850$ 106,350$
Commodities 10,477 11,505 15,000 12,000
Contractual Services 71,156 75,916 91,960 96,376
Total 143,713$ 161,040$ 191,810$ 214,726$
Percent Change 12.1% 19.1% 11.9%
Full-Time Equivalent positions 0.47 0.58 0.62 0.80
Expenditures by Classification
This budget increased by 13.0% in 2025 or $24,906. The increase in personnel services is due to step, COLA,
insurance benefit increases.
2025 BUDGET
Fund # :
Activity # :
Conducts the financial affairs of the City in accordance with the Government Accounting Standards Board
(GASB)and Generally Accepted Accounting Principles (GAAP).This includes protecting the assets of the City,
the initiation of financial plans,investment and debt management,review and implementation of internal controls,
and accounting for financial transactions including accounts payable, accounts receivable and payroll.
1. Continue working to refine the financial management plan for the City.
2. Continue to produce an Annual Comprehensive Financial Report (ACFR) and reports for the public (Popular
Annual Finance Report - PAFR) that receive the GFOA's award for excellence in reporting.
3. Provide meaningful and timely financial reports and information to Council, Commissions and other City
Departments.
1. Implement improved reporting procedures to inform Council, Commissions and Departments.
2. Work with other Departments to find ways to reduce costs of City operations.
3. Analyze and implement ways to reduce transaction processing and costs.
49%
6%
45%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:General Government 101
Activity:TCAAP 41600
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 37,020$ 39,431$ 43,900$ 50,350$
Commodities - - - -
Contractual Services 10,797 38,226 71,000 70,000
Total 47,817$ 77,657$ 114,900$ 120,350$
Percent Change 62.4% 48.0% 4.7%
Full-Time Equivalent positions 0.23 0.23 0.25 0.27
Expenditures by Classification
Ramsey County purchased the property and established a Joint Development Authority (JDA) with the City.
Placeholders for consultant costs have been included, and staff time has been allocated for City Administration,
Community Development, and Public Works as they act as the City’s support staff to this Authority. The 2025
budget shows an increase of 4.7%.
2025 BUDGET
Fund # :
Activity # :
This department was established to account for revenue and expenditure activity related to the City’s
comprehensive re-use planning at the Twin Cities Army Ammunition Plant (TCAAP) site.
1. Coordination of TCAAP redevelopment planning activities while continuing to meet the needs of the City of
Arden Hills.
2. Work with Ramsey County through the Joint Development Authority (JDA).
1. Economic conditions.
2. Coordinating with multiple entities/players.
42%
58%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:General Government 101
Activity:Planning & Zoning 41910
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 115,217$ 190,620$ 239,180$ 270,170$
Commodities - 123 - -
Contractual Services 84,002 37,062 85,760 148,320
Total 199,219$ 227,805$ 324,940$ 418,490$
Percent Change 14.3% 42.6% 28.8%
Full-Time Equivalent positions 0.93 1.51 1.89 1.89
Expenditures by Classification
The budget for 2025 is an increase of 28.8% over the 2024 budget. Contractual services includes $60,000 for
Software Conversion for Permits, Community Development, & Code Enforcement.
2025 BUDGET
Fund # :
Activity # :
Responsible for all planning and zoning related functions of the City. Activities administered by this department
include requests for variances, subdivisions, re-zonings, zoning code amendments, signs, conditional use
permits, compliance with City Ordinances and other land use issues. The Planners work closely with Protective
Inspections, Code Enforcement, and Community Development.
The Planning Commission, consisting of seven members appointed annually by the City Council, meets monthly
to review the above requests and to make recommendations to the City Council in an advisory capacity.
1. Continue to work on Rental Housing registrations.
2. Continue improvements of the City's planning process.
1. Rental Housing registrations.
2. Refine Building Permit process.
3. Research and refine an Administrative Fines process.
65%
35%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:General Government 101
Activity:Government Buildings 41940
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 35,823$ 38,713$ 38,100$ 39,120$
Commodities 8,056 10,786 9,180 9,180
Contractual Services 170,221 179,316 185,620 191,662
Total 214,101$ 228,815$ 232,900$ 239,962$
Percent Change 6.9% 1.8% 3.0%
Full-Time Equivalent positions 0.28 0.27 0.26 0.28
Expenditures by Classification
The 2025 budget is an increase of 3.9% from the previous year’s budget primarily due to anticipated rent increase
for the Public Works maintenance facility.
2025 BUDGET
Fund # :
Activity # :
This department captures all of the operation/maintenance related costs for the City Hall and Government Building
facilities.
The City entered into a contract with Ramsey County for a joint maintenance facility located just west of City Hall
off County Road 96 on Paul Kirkwold Drive. The new facility was completed and occupied as of October 2004.
45% of the City’s portion of the Ramsey County maintenance facility is charged to this budget.
Maintain a reputable facility to house meetings and staff.
Normal maintenance and repair issues as the building (City Hall) has now been in operation since 2002.
16%4%
80%
Personnel Services
Commodities
Contractual Services
2024 PERCENT
ORIGINAL OVER(UNDER)
Total By Program ACTUAL ACTUAL BUDGET BUDGET 2023 BUDGET
Police 1,452,262$ 1,491,764$ 1,585,240$ 1,725,298$ 8.8%
Dispatch 61,808 68,737 70,390 73,570 4.5%
Fire 696,675 751,177 833,930 906,321 8.7%
Emergency Management 6,622 8,587 9,260 9,680 4.5%
Protective Inspections 328,682 383,744 396,120 392,120 -1.0%
Totals 2,546,049 2,704,009 2,894,940 3,106,989 7.3%
Total By Classification
Personnel Services 1,553 662 1,250 1,250 0.0%
Commodities 1,512,301 1,598,810 1,661,990 1,794,468 8.0%
Contractual Services 758,483 819,914 904,320 979,891 8.4%
Capital Outlay 0 0 0 0 N/A
Other Charges 0 0 0 0 N/A
Totals 2,272,337 2,419,387 2,567,560 2,775,609 8.1%
Staffing
Full-time equivalents 0.00 0.00 0.00 0.00
Expenditures
CITY OF ARDEN HILLS, MINNESOTA
PUBLIC SAFETY SUMMARY
EXPENDITURE ANALYSIS
2022 2023 2025
0
500
1,000
1,500
2,000
2,500
3,000
3,500
ACTUAL
2022
ACTUAL
2023
BUDGET
ORIGINAL
2024
BUDGET
2025
Th
o
u
s
a
n
d
s
CITY OF ARDEN HILLS, MINNESOTA
Function:Public Safety 101
Activity:Police 42100
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services -$ -$ -$ -$
Commodities - - - -
Contractual Services 1,452,262 1,491,764 1,585,240 1,725,298
Total 1,452,262$ 1,491,764$ 1,585,240$ 1,725,298$
Percent Change 2.7% 6.3% 8.8%
Expenditures by Classification
Arden Hills' portion of the Ramsey County Sheriff’s Contracting Communities 2025 budget increased 8.8% over
2024. Animal control costs and boarding are included within this budget.
2025 BUDGET
Fund # :
Activity # :
Law Enforcement services for Arden Hills are provided on a contractual basis with the Ramsey County Sheriff ’s
Department. Animal control services are included in this budget.
Continue contracting for law enforcement and animal control services.
1. Resident concerns over police coverage and visibility.
2. Response times.
100%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:Public Safety 101
Activity:Dispatch 42150
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services -$ -$ -$ -$
Commodities - - - -
Contractual Services 61,808 68,737 70,390 73,570
Total 61,808$ 68,737$ 70,390$ 73,570$
Percent Change 11.2% 2.4% 4.5%
Expenditures by Classification
Arden Hills' portion of the Ramsey County 911 Dispatch Department operating budget increased by 4.5%.
2025 BUDGET
Fund # :
Activity # :
Emergency dispatch services are provided by Ramsey County.
Continue contracting dispatch services.
Continue to maintain service levels at a reasonable cost.
100%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:Public Safety 101
Activity:Fire 42200
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services -$ -$ -$ -$
Commodities - - - -
Contractual Services 696,675 751,177 833,930 906,321
Total 696,675$ 751,177$ 833,930$ 906,321$
Percent Change 7.8% 11.0% 8.7%
Expenditures by Classification
Arden Hills’ portion of the Lake Johanna Fire Department operating budget increased 8.7%. This budget reflects
increases to operating costs.
2025 BUDGET
Fund # :
Activity # :
Fire protection for Arden Hills is provided by the Lake Johanna Fire Department on a contractual basis. Lake
Johanna Fire Department presently provides services to the cities of Arden Hills, Shoreview, and North Oaks.
Arden Hills pays a percentage of operating and capital costs based on a formula approved by the Lake Johanna
Fire Department and Arden Hills City Council.
Continue contracting for fire protection services.
Continue to maintain service levels at a reasonable cost.
100%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:Public Safety 101
Activity:Emergency Management 42300
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 5,161$ 5,164$ 7,710$ 8,030$
Commodities - - - -
Contractual Services 1,461 3,423 1,550 1,650
Total 6,622$ 8,587$ 9,260$ 9,680$
Percent Change 29.7% 7.8% 4.5%
Full-Time Equivalent positions 0.02 0.02 0.04 0.04
Expenditures by Classification
The 2025 budget is an increase of 4.5% from the 2024 budget or $420.
2025 BUDGET
Fund # :
Activity # :
Emergency Management coordination for the City is required by the Federal Government. This department works
closely with Ramsey County Department of Homeland Security, as well as the Ramsey County Sheriff and Lake
Johanna Fire Department. The City contracts with a consultant to provide these services.
1. Update City's Emergency Response Policy and Procedures.
2. Train staff in emergency management procedures.
Coordinate with Ramsey County’s emergency response procedures and policies.
83%
17%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:Public Safety 101
Activity:Protective Inspections 42400
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 268,552$ 279,459$ 319,670$ 323,350$
Commodities 1,553 662 1,250 1,250
Contractual Services 58,578 103,623 75,200 67,520
Total 328,682$ 383,744$ 396,120$ 392,120$
Percent Change 16.8% 3.2% (-1.0%)
Full-Time Equivalent positions 2.62 2.50 2.74 2.77
Expenditures by Classification
The 2025 operating budget is a decrease of -0.5% from the previous year’s budget. There is a decrease of
$8,000 for electrical inspection services based on projected revenues.
2025 BUDGET
Fund # :
Activity # :
This department is responsible for all building construction, plumbing, sewer, water and mechanical inspections
within the City. Electrical inspections are contracted with an independent inspection firm. This department is also
responsible for enforcement of the Zoning Code and other sections of the City Code of Ordinances.
1. Continue implementation of the building codes.
2. Continue to work on Building Permit software to produce Council reports.
1. Managing and prioritizing department workloads.
2. Keep up with rental license inspections of investor owned residential properties.
3. Continue implementation and design of new Building Permit software and reports.
83%
17%
Personnel Services
Commodities
Contractual Services
2024 PERCENT
ORIGINAL OVER(UNDER)
Total By Program ACTUAL ACTUAL BUDGET BUDGET 2023 BUDGET
Streets 914,150$ 682,508$ 853,380$ 993,770$ 16.5%
Totals 914,150 682,508 853,380 993,770 16.5%
Total By Classification
Personnel Services 317,000 337,706 381,130 419,820 10.2%
Commodities 66,755 59,540 65,500 66,000 0.8%
Contractual Services 530,395 285,261 406,750 507,950 24.9%
Capital Outlay 0 0 0 0 N/A
Other Charges 0 0 0 0 N/A
Totals 914,150 682,508 853,380 993,770 16.5%
Staffing
Full-time equivalents 2.36 2.40 2.49 2.61
Expenditures
CITY OF ARDEN HILLS, MINNESOTA
PUBLIC WORKS SUMMARY
EXPENDITURE ANALYSIS
2022 2023 2025
0
200
400
600
800
1,000
1,200
ACTUAL
2022
ACTUAL
2023
BUDGET
ORIGINAL
2024
BUDGET
2025
Th
o
u
s
a
n
d
s
CITY OF ARDEN HILLS, MINNESOTA
Function:Public Works 101
Activity:Street Maintenance 43100
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 317,000$ 337,706$ 381,130$ 419,820$
Commodities 66,755 59,540 65,500 66,000
Contractual Services 530,395 285,261 406,750 507,950
Total 914,150$ 682,508$ 853,380$ 993,770$
Percent Change (-25.3%) 25.0% 16.5%
Full-Time Equivalent positions 2.36 2.40 2.49 2.61
Expenditures by Classification
The 2025 operating budget is an increase of $140,390 from the previous year’s budget. Personnel service
increases are due to an increase in the fte allocation, step, COLA and insurance benefit increases. Adjustments
were made to contractual services for sealcoating/resurfacing and in-house paving costs.
2025 BUDGET
Fund # :
Activity # :
This department is responsible for maintaining City streets, including snowplowing, minor street repair, street
signs, and street sweeping.
1. Maintain street infrastructure utilizing all available techniques including crack sealing, seal coating, patching
and overlays.
2. Recommend a cost effective program for reconstructing/reclaiming street surfaces when maintenance
techniques no longer provide the desired results.
3. Maintain and update equipment and vehicles.
1. Implement a capital improvement program for City infrastructure.
2. Balance the public works department needs with available funds.
3. Aging equipment.
4. Increased safety regulation for equipment and vehicles.
42%
7%
51%
Personnel Services
Commodities
Contractual Services
2024 PERCENT
ORIGINAL OVER(UNDER)
Total By Program ACTUAL ACTUAL BUDGET BUDGET 2023 BUDGET
Recreation 178,808$ 176,655$ 241,970$ 250,358$ 3.5%
Parks 486,969 544,634 588,030 645,180 9.7%
Totals 665,777 721,288 830,000 895,538 7.9%
Total By Classification
Personnel Services 361,770 364,763 425,570 468,660 10.1%
Commodities 74,038 112,797 102,090 104,628 2.5%
Contractual Services 106,174 117,252 140,960 147,020 4.3%
Capital Outlay 0 0 0 0 N/A
Other Charges 0 0 0 0 N/A
Totals 541,982 594,812 668,620 720,308 7.7%
Staffing
Full-time equivalents 3.03 2.98 3.09 3.28
Expenditures
CITY OF ARDEN HILLS, MINNESOTA
PARKS & RECREATION SUMMARY
EXPENDITURE ANALYSIS
2022 2023 2025
0
200
400
600
800
1,000
ACTUAL
2022
ACTUAL
2023
BUDGET
ORIGINAL
2024
BUDGET
2025
Th
o
u
s
a
n
d
s
CITY OF ARDEN HILLS, MINNESOTA
Function:Parks and Recreation 101
Activity:Recreation 45120
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 123,795$ 126,476$ 161,380$ 175,230$
Commodities 14,553 15,360 23,400 22,250
Contractual Services 40,460 34,818 57,190 52,878
Total 178,808$ 176,655$ 241,970$ 250,358$
Percent Change (-1.2%) 37.0% 3.5%
Full-Time Equivalent positions 1.12 1.26 1.19 1.37
% of costs covered by revenue 44.4%37.2%30.9%27.4%
Expenditures by Classification
The 2025 operating budget is an increase of 9.2% from the previous year’s budget. This is mainly due to
allocation, step, COLA and insurance benefit increases.
2025 BUDGET
Fund # :
Activity # :
This department provides all recreational activities to residents of Arden Hills, as well as residents from
neighboring communities.
To provide recreational activities to residents of Arden Hills.
1. Develop senior programming.
2. Budget constraints.
70%
9%
21%
Personnel Services
Commodities
Contractual Services
CITY OF ARDEN HILLS, MINNESOTA
Function:Parks and Recreation 101
Activity:Park Maintenance 45200
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services 347,218$ 349,403$ 402,170$ 446,410$
Commodities 33,578 77,978 44,900 51,750
Contractual Services 106,174 117,252 140,960 147,020
Total 486,969$ 544,634$ 588,030$ 645,180$
Percent Change 11.8% 8.0% 9.7%
Full-Time Equivalent positions 3.03 2.98 3.09 3.28
Expenditures by Classification
The 2025 operating budget is an increase of 9.7% from the previous year’s budget. This is mainly due to
allocation, step, COLA, temp wages, and insurance benefit increases.
2025 BUDGET
Fund # :
Activity # :
Responsible for maintenance of City parks and trails as well as administration of the diseased tree/forestry
program. This includes maintaining and improving playground and picnic facilities, fertilizing and mowing of grass,
maintaining athletic fields, flooding and maintenance of outdoor ice rinks, snow and ice removal, and tree
preservation within the parks system of the City. These assets of the City are extensively used by the residents,
and improvements must be made to uphold the safety, functionality and beauty the City represents.
1. Continue pathway maintenance.
2. Continue implementing City's Comprehensive Park and Trails plan.
1. Other maintenance concerns coming up and not allowing completion of existing projects.
2. Budget constraints for future and existing projects.
69%
8%
23%
Personnel Services
Commodities
Contractual Services
2024 PERCENT
ORIGINAL OVER(UNDER)
Total By Program ACTUAL ACTUAL BUDGET BUDGET 2023 BUDGET
Unallocated 102,540$ 171,140$ 50,000$ 50,000$ 0.0%
Totals 102,540 171,140 50,000 50,000 0.0%
Total By Classification
Personnel Services - - - - N/A
Commodities - - - - N/A
Contractual Services - - - - N/A
Capital Outlay - - - - N/A
Other Charges 102,540 171,140 50,000 50,000 0.0%
Totals 102,540 171,140 50,000 50,000 0.0%
Staffing
Full-time equivalents 0.00 0.00 0.00 0.00
Expenditures
CITY OF ARDEN HILLS, MINNESOTA
MISCELLANEOUS SUMMARY
EXPENDITURE ANALYSIS
2022 2023 2025
0
100
200
ACTUAL
2022
ACTUAL
2023
BUDGET
ORIGINAL
2024
BUDGET
2025
Th
o
u
s
a
n
d
s
CITY OF ARDEN HILLS, MINNESOTA
Function:Unallocated 101
Activity:Transfers 49300
Activity Scope
Objectives
Issues
Budget Commentary
2022 2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services -$ -$ -$ -$
Commodities - - - -
Contractual Services - - - -
Other Charges 102,540 171,140 50,000 50,000
Total 102,540$ 171,140$ 50,000$ 50,000$
Percent Change 66.9% (-70.8%) 0.0%
Expenditures by Classification
This budget is used to account for transfers out of the General Fund to other funds of the City. $102,540 and
$171,140 was transferred to the PIR fund in 2022 and 2023 respectively. Both the 2024 and 2025 budgets include
a transfer to the Cable Fund of $50,000.
2025 BUDGET
Fund # :
Activity # :
The transfers to other funds budget is utilized to account for the transfer of general fund revenues to other funds
within the City financial structure.
1. To build reserves for capital equipment replacement.
2. To subsidize infrastructure improvements.
Budget constraints.
100%
Personnel Services
Commodities
Contractual Services
Other Charges
PRELIMINARY 2025 BUDGET
LEVY IMPACT
Description Effect on Levy % Chg
Transfer to Cable Fund 50,000 0.9%
4% Market Adjustment 51,801
Step Increases and Position Changes 53,866
3% COLA Adjustments 49,734
Insurance/Work Comp Benefits 25,459
180,860 3.4%
Increase in RamCo Sheriff 140,058
Increase in LJFD 72,391
Election Services 21,450
RamCo Facility Maintenance Facility ‐ Rent 6,032
One‐Time Comp Study Charge (17,500)
Street Maintenance Program 105,000
Permit Software Conversion 60,000
Net changes in other GF Budget Areas (37,942)
580,349 10.9%
Equipment/Bldg Replacement (60,000)
Public Safety 220,000
160,000
740,349 13.9%
249,062
989,411 18.6%
Personnel Costs
Total General Fund Costs
Total CIP Fund Costs
Total General & CIP Fund Costs
Underfunded Levy Costs
Total Balanced Levy Costs
COMPARISON OF PROPERTY TAXES
2021 2022 2023 2024 Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 1 % Change Scenario 2 % Change Scenario 3 % Change Scenario 4 % Change
General Fund 3,760,080 3,902,680 4,098,680 4,650,950 5,231,299 5,362,701 5,362,701 5,362,701 580,349 12.5%711,751 15.3%711,751 15.3%711,751 15.3%
EDA Fund 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 - 0.0%- 0.0%- 0.0%- 0.0%
Capital Improvements
Equipment/Bldg Replacement 50,000 50,000 50,000 270,000 210,000 210,000 210,000 210,000 (60,000) -22.2%(60,000) -22.2%(60,000) -22.2%(60,000) -22.2%
PIR 250,000 250,000 250,000 250,000 250,000 250,000 1,550,000 3,550,000 - 0.0%- 0.0%1,300,000 520.0%3,300,000 1320.0%
Public Safety 120,000 170,000 220,000 40,000 260,000 635,000 635,000 635,000 220,000 550.0%595,000 1487.5%595,000 1487.5%595,000 1487.5%
Total Capital Improvements 420,000 470,000 520,000 560,000 720,000 1,095,000 2,395,000 4,395,000 160,000 28.6%535,000 95.5%1,835,000 327.7%3,835,000 684.8%
TOTAL LEVY 4,280,080 4,472,680 4,718,680 5,310,950 6,051,299 6,557,701 7,857,701 9,857,701 740,349 13.9%1,246,751 23.5%2,546,751 48.0%4,546,751 85.6%
Change from previous year 3.5%4.5%5.5%12.6%13.9%23.5%48.0%85.6%
Assumptions
Scenario 1: Baseline - 3% COLA, 10% Health, 4% Dental, RamCo Police, LJFD Fire, RamCo Election Services AND CIP Levy Increase of $160K
Scenario 2: Scenario 1 AND Public Works Staff ($132K), LJFD New Station ($375K)
Scenario 3: Scenario 2 AND Old Hwy 10 Trail ($1.3M)
Scenario 4: Scenario 3 AND Lake Johanna Blvd Trail ($2.0M)
Tax Levy %Tax Levy Underfunded Total
Increase Increase Amount Levy
18.6%989,411 - 6,300,361
13.9%740,349 (249,062) 6,051,299
10.0%531,095 (458,316) 5,842,045
5.0%265,548 (723,863) 5,576,498
506,402 28.2%1,495,813 - 6,806,763
23.5%1,246,751 (249,062) 6,557,701
10.0%531,095 (964,718) 5,842,045
5.0%265,548 (1,230,265) 5,576,498
1,300,000 52.6%2,795,813 - 8,106,763 (152,400) PMT Bonding: 3% Interest, 10 years, $1.3M
48.0%2,546,751 (249,062) 7,857,701 (1,523,997) COST
10.0%531,095 (2,264,718) 5,842,045 (223,997) INT
5.0%265,548 (2,530,265) 5,576,498
2,000,000 90.3%4,795,813 - 10,106,763 (234,461) PMT Bonding: 3% Interest, 10 years, $2.0M
85.6%4,546,751 (249,062) 9,857,701 (2,344,610) COST
10.0%531,095 (4,264,718) 5,842,045 (344,610) INT
5.0%265,548 (4,530,265) 5,576,498
Proposed 2025 Increase / (Decrease) over 2024 Budget
S
c
e
n
a
r
i
o
1
S
c
e
n
a
r
i
o
3
S
c
e
n
a
r
i
o
4
S
c
e
n
a
r
i
o
2