Loading...
HomeMy WebLinkAbout03-10-25-WSPUBLIC INQUIRIES/INFORMATIONAL This is an opportunity for citizens to respectfully bring to the Council ’s attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting. RESPONSE TO PUBLIC INQUIRIES AGENDA ITEMS Parks System Planning Proposal Bryce Shearen and Casey Byers, Bolton & Menk MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF Zoning Code Update Jessica Jagoe City Administrator MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF State Of The City Jessica Jagoe, City Administrator MEMO.PDF Code Of Conduct Policy Jessica Jagoe, City Administrator MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF Agenda Planning Jessica Jagoe, City Administrator MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF Rice Creek Commons/TCAAP Discussion Jessica Jagoe, City Administrator MEMO.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor: David Grant Councilmembers: Brenda Holden Emily Rousseau Tena Monson Kurt Weber City Council Work Session Agenda March 10, 2025 5:30 p.m. City Hall Address: 1245 W Highway 96 Arden Hills MN 55112 Phone: 651 -792 -7800 Website : www.cityofardenhills.org City Vision Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play. Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills. https://cityofardenhills.org/320/Watch - City -Meetings This meeting will be streamed live on local Cable Channel 16 and available for playback on our website. CALL TO ORDER 1. 2. 3. 3.A. Documents: 3.B. Documents: 3.C. Documents: 3.D. Documents: 3.E. Documents: 3.F. Documents: 4. PUBLIC INQUIRIES/INFORMATIONALThis is an opportunity for citizens to respectfully bring to the Council ’s attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting.RESPONSE TO PUBLIC INQUIRIESAGENDA ITEMSParks System Planning Proposal Bryce Shearen and Casey Byers, Bolton & Menk MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF Zoning Code Update Jessica Jagoe City Administrator MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF ATTACHMENT D.PDF State Of The City Jessica Jagoe, City Administrator MEMO.PDF Code Of Conduct Policy Jessica Jagoe, City Administrator MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF ATTACHMENT C.PDF Agenda Planning Jessica Jagoe, City Administrator MEMO.PDF ATTACHMENT A.PDF ATTACHMENT B.PDF Rice Creek Commons/TCAAP Discussion Jessica Jagoe, City Administrator MEMO.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor:David GrantCouncilmembers:Brenda HoldenEmily RousseauTena MonsonKurt Weber City Council Work Session Agenda March 10, 2025 5:30 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsThis meeting will be streamed live on local Cable Channel 16 and available for playback on our website.CALL TO ORDER1.2.3.3.A. Documents: 3.B. Documents: 3.C. Documents: 3.D. Documents: 3.E. Documents: 3.F. Documents: 4. PUBLIC INQUIRIES/INFORMATIONALThis is an opportunity for citizens to respectfully bring to the Council ’s attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting.RESPONSE TO PUBLIC INQUIRIESAGENDA ITEMSParks System Planning Proposal Bryce Shearen and Casey Byers, Bolton & MenkMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFZoning Code UpdateJessica Jagoe City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFState Of The CityJessica Jagoe, City AdministratorMEMO.PDFCode Of Conduct PolicyJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFAgenda PlanningJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFRice Creek Commons/TCAAP DiscussionJessica Jagoe, City Administrator MEMO.PDF COUNCIL/STAFF COMMENTS ADJOURN Mayor:David GrantCouncilmembers:Brenda HoldenEmily RousseauTena MonsonKurt Weber City Council Work Session Agenda March 10, 2025 5:30 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsThis meeting will be streamed live on local Cable Channel 16 and available for playback on our website.CALL TO ORDER1.2.3.3.A.Documents:3.B.Documents:3.C.Documents:3.D.Documents:3.E.Documents:3.F.Documents: 4. Page 1 of 1 AGENDA ITEM – 3A MEMORANDUM DATE: March 10, 2025 TO: Honorable Mayor and City Councilmembers Jessica Jagoe, City Administrator FROM: David Swearingen, P.E. Public Works Director / City Engineer SUBJECT: Park System Planning Proposal Discussion Budgeted Amount: Actual Amount: Funding Source: $75,000 $74,900 - $84,800 PIR – Parks (TBD through discussion) Council Should Consider • Council should discuss the proposal for the Park System Master Plan. Background/Discussion From direction of the City Council at the February 10, 2025, Council Work Session, Bolton & Menk has prepared a proposal from completing a Park System Master Plan for the city. Bryce Shearen, CPRE, and Casey Byers, PLA, from Bolton & Menk will be at the Work Session to review the proposal and stand for any questions the Council may have. Budget Impact The City currently has $75,000 budgeted for this project in 2025. The proposal from Bolton & Menk ranges from the base package fee at $74,900 up to $84,800 if alternative services are desired by the City Council. Complete details of these services will be outlined in the presentation. Attachments Attachment A – Park System Master Plan Proposal Attachment B – Enhanced Engagement Tools 111 Washington Avenue South Suite 650 | Minneapolis, MN 55401 612-416-0220 | Bolton-Menk.com PARK SYSTEM PLAN CITY OF ARDEN HILLS, MINNESOTA MARCH 5, 2025 Contact: Bryce Shearen, CPRE 763-344-3319 Bryce.Shearen@bolton-menk.com 111 Washington Avenue South Suite 650 | Minneapolis, MN 55401 612-416-0220 | Bolton-Menk.com BOLTON & MENK IS AN EQUAL OPPORTUNITY EMPLOYER. Dear David: The City of Arden Hills' Parks, Trails, and Open Space Plan is an exciting opportunity to elevate the city’s sense of fun, safety, and community pride. Bolton & Menk, Inc. is uniquely positioned to support this initiative, leveraging decades of experience in park planning and design. We understand that the City of Arden Hills provides a system of parks and facilities with diverse recreational opportunities. Our approach to this project centers on comprehensive community engagement, which we believe is crucial to the success of any public planning initiative. Our guiding principles ensure that the plan will be safe, sustainable, and beautiful. PARKS AND RECREATION EXPERTS We are passionate about park and recreation planning and are dedicated to a set of strong guiding principles. We strive to build and sustain healthy, equitable, and resilient communities while navigating current and future opportunities and challenges. Our team shares one goal—to create healthy connected communities for all. EQUITABLE ENGAGEMENT Our approach is to collaborate with the City of Arden Hills to bring a tailored engagement process that prioritizes inclusive and equitable engagement. Our team is skilled in combining traditional and innovative public outreach strategies to involve a diverse range of park users. We’re especially focused on engaging historically underrepresented communities in recreation planning, identifying their needs, and addressing barriers that may prevent them from fully enjoying Arden Hills parks. Our goal is to create an inclusive plan that truly reflects the community’s desires and aspirations. IMPLEMENTATION-BASED We pride ourselves on creating plans that are not just visionary, but also practical and implementable. Arden Hills park system is a cherished asset, providing year-round recreation for residents and visitors. Our team understands how to optimize these resources to enhance quality of life and maintain Arden Hills reputation as a premier city in the metro area. You can trust that our approach will be thoughtful, efficient, and aligned with the city’s long-term goals. We share your dedication to creating safe, sustainable, and enjoyable spaces for the entire community. We look forward to the opportunity to work together and help make the City of Arden Hills’ vision of its parks a reality. I will serve as your lead client contact and project manager. Please contact me at 763-344-3319 or Bryce.Shearen@bolton-menk.com if you have any questions regarding our proposal. Respectfully submitted, Bolton & Menk, Inc. Bryce Shearen, CPRE Project Manager February 05, 2025 David Swearingen Public Works Director/City Engineer City of Arden Hills 1245 W Highway 96 Arden Hills, MN 55112 RE: Proposal for Park System Plan Colorado Denver Iowa Algona Ames Cedar Rapids Des Moines Jefferson Spencer North Carolina Charlotte Kinston Raleigh Wilmington Youngsville North Dakota Bismarck Fargo Grand Forks South Carolina Conway Greenville Myrtle Beach Rock Hill Minnesota Baxter Burnsville Chaska Duluth Eden Prairie Fairmont Grand Rapids Hibbing Mankato MankatoCreative Studio Minneapolis Mountain Iron Oakdale Plymouth Ramsey Rochester Sleepy Eye St. Cloud Willmar FIRM PROFILE BOLTON & MENK We believe all people should live in safe, sustainable, and beautiful communities and we take pride in our ability to make that happen. It's why we get out of bed every morning. We promise every client two things: WE'LL WORK HARD FOR YOU AND WE'LL DO A GOOD JOB. We take a personal interest in the work being done around us and do our part to build a better quality of life for all. At the end of the day, we're Real People offering Real Solutions. Our commitment to communities began in 1949, serving the needs of municipal clients in small towns. As we continue to grow in both numbers and experience, our dedication to building trust and ensuring a true partnership with our clients remains the same. Our goal is to help communities make progress by listening to what people want, finding the best solutions for their needs, and treating them right. Simply put, we're people helping people. Today, Bolton & Menk has more than 1,000 multiregional employees including a professional staff of more than 300 engineers, planners, landscape architects, and surveyors. Our dedication to our clients shines through in the work we provide. We are committed to cultivating and delivering exceptional community infrastructure solutions. From advocating for our communities to designing their dreams to finding funding; we take pride in our work because we live here too. We believe in the power of face-to-face meetings, friendly conversations, and collaborative decision-making to keep your projects on schedule, within budget, and focused on real, workable solutions. We're Your Local, Trusted Partner We understand the city’s processes through our team’s work on prior projects, including the improvement projects at Arden Manor, Arden Oaks, and Freeway Park. As well as various road constructions, grant applications, and on-call services for general engineering and parks related projects. Several Bolton & Menk employees live in and near Arden Hills and are personally invested in this project. 1 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNFIRM PROFILE WORK PLAN The City of Arden Hills can rest assured that the Bolton & Menk team will provide superior project management, exceptional community engagement facilitation, and outstanding technical deliverables in a timely and cost-effective manner to create this plan. The document is intended to provide guidance to the Public Works Department, Parks, Trails & Recreation Committee (PTRC), city council, and the community to prioritize programs and projects as future decisions are made on how to manage and improve the park and trail system. The resulting master plan will be flexible in format so that it can be integrated into the city’s 2050 Comprehensive Plan. The detailed work plan is outlined by tasks addressing all elements from city council direction. Under each phase, time has been allocated for task management that will capture the effort necessary for internal project team coordination. PHASE 1: EXISTING CONDITION INVENTORY AND ANALYSIS The inventory and analysis phase of our work plan will allow us to develop a thorough understanding of the qualitative and quantitative condition of the park system. We will also look into the programming and services offered by the city, as well as the departmental operations of the park department. The following are specific components of this phase that will be accomplished: • Level of Service (LOS) analysis: identify gaps and redundancy in park proximity across the community • Evaluate the type, quantity, and conditions of assets • Develop comparative metrics considering National Recreation and Parks Association (NRPA) data, national recreation trends, and peer-community comparisons • Mobility analysis: identify high-level gaps in connectivity to parks and trails and reviewing how certain connections could be achieved • Input gathering: at a community-wide level, and through the input of stakeholders and staff We will rely on city staff knowledge to supplement data collection through site inventories or database reviews during this task. Evaluation of this information with respect to national trends and benchmarks—along with the operational needs and goals of the public works department— will be included in this phase. Task 1.1: Preparation of Base Mapping Working with our GIS team and city staff, we will develop base mapping for the overall community, as well as individual park and trail facilities to use throughout the planning process. 2WORK PLAN PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MN Task 1.2: Previous Plan Audit In coordination with city staff, our team will review the following previously completed planning studies and reports that are related to this plan: • 2040 Comprehensive Plan • 2002 Parks, Trails and Open Space Plan • Previously prepared park inventory data • Maintenance, operations, and other departmental data • Metropolitan Council Parks and Trails Plan • Ramsey County Parks and Recreation Master Plan • Arden Hills Capital Improvement Plan relating to Parks and Recreation Task 1.3: Field Inventory and Review of Existing Park and Trail Facilities Data will be collected of existing park and trail facilities/amenities to develop both a qualitative and quantitative understanding of each park within the City of Arden Hills. To streamline this process, we will start with what we/city staff already know and use current or recently documented information to plug into our collective inventory of data. Visiting current park facilities is essential to understanding and familiarizing ourselves with its resources, reviewing existing conditions, and confirming the accuracy of collected data to update the city park inventory. All information will be added to a customized Field Map app that will allow inventory collection to be easily integrated with Arden Hills existing GIS software. We will also assess amenity adherence to the Americans with Disabilities Act (ADA). Task 1.4: Park and Recreation Programs Review current park and recreation programs and available park use data as provided by the city. Task 1.5: Demographics, Trends, and National Metrics Analysis Our team will review available information from Metropolitan Council, the U.S. census, NRPA, and previous studies completed in Arden Hills and Ramsey County to understand and document demographic shifts, local and regional trends, and what is new in the parks and recreation field. Understanding these changes will be critical to formulating a future vision for the park system. Along with city staff, we will review the existing funding allocations to assess how Arden Hills compares to national averages and communities with similar park systems. We will identify opportunities for the city to consider improving its facility’s functionality and level of service. This effort will include a review of funding strategies. Task 1.6: Steering Committee Meeting No. 1 This meeting will be an opportunity to introduce the planning process, review work completed to date, review project timeline, and engage the committee in analysis. We will review where they have been in the past, what the collective vision is for the future, and equally important, to set expectations for how the committee can be champions for the park system planning process. The proposed steering committee will be comprised of city staff, two PTRC members, and two city council members. Our team will assist the city in determining how this committee will be engaged during the process, what level of decision making and review responsibility it will have, and how they can advocate for input and participation. Task 1.7: PTRC Meeting No. 1 The planning team will present the findings from the existing conditions inventory and analysis to the PTRC and gather feedback on the findings. Our team will develop meeting materials including agendas, content, and meeting minutes. 3 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNWORK PLAN PHASE 2: PUBLIC ENGAGEMENT A successful parks and recreation master plan must reflect the needs and desires of the stakeholders that will fund, use, and maintain the facilities. Public involvement and engagement is one of the most critical components of the planning process. We are committed to providing a robust engagement process that goes beyond traditional engagement methods and provide fun, convenient, and accessible methods that will range from in-person and online formats to engage stakeholders. The planning team will evaluate and summarize all the community engagement events to better understand community needs and desires for the park and trail system. These findings will help guide final recommendations and the importance of improvements. Task 2.1: Community Survey Working in conjunction with city staff, we will develop a survey to solicit input from the broader community. We envision this to be available through an online platform to allow for efficiency to respondents and in data collection and analysis. The Bolton & Menk team will provide the city with a link to the survey for use on its public- facing website and social media platforms. Upon completion of the survey timeframe, we will provide a summary of the results. This information will inform recommendations and priorities in the master plan. *A hard copy of the survey can be made available if the city would like to distribute paper copies. City staff would need to add responses from the paper copies to the online survey platform. Task 2.2: Pop-Up Engagement Our team will facilitate two pop-up meetings to solicit feedback from the public. Our intention is to coordinate these efforts with city staff to determine a venue and existing community events that would engage with culturally unique populations in the community while still being available for all residents to participate. Possibilities include the Touch-a-Truck event in May and Penny Carnival in July. Alternative Task 2.3: Enhanced Survey and Project Marketing Effective public engagement plays a key role in project success. To generate interest in the online survey and getting feedback from residents, signage and sidewalk/trail decals will be incorporated throughout the city during the survey phase. The enhanced tools will be eye- catching and have a QR code that links to the survey and other important online materials. These enhanced tools will not only allow an alternative way for residents to discover a way to provide feedback but will also allow residents to be aware of the important park system planning project. Our team proposes using 25 yard signs and 25 trail decals. Alternative Task 2.4: Interactive Community Map In addition to our online survey, we will use our INPUTiD™ web-based comment map to gather feedback on the existing conditions and proposed project designs. Location-based feedback aids in understanding community input, while user features like liking, disliking, and responding to comments help us identify key issues, ideas, and concerns in exact locations. Alternative Task 2.5: Youth Engagement Youth are often some of the heaviest users of a community’s park system; capturing their voices is critical to successful master plan development. We suggest coordinating with local schools to distribute an activity that is tailored to this demographic and will invite youth to share what is important to them in the parks and recreation system. 4 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNWORK PLAN Task 2.6: Project Open House To ensure the community remains engaged in the master planning process, we propose one open house events at city hall. The open house will present key findings from the needs analysis, the current state of the park system, and how the park system should grow in the future. This feedback will inform prioritization of initiatives/improvements. The location of the open house will be important, so it is inviting and easy to access. We will work with city staff to determine the best location and date to schedule the event. The open house events are an important step in seeking consensus from the community while validating that this plan was developed in part from the feedback they provided throughout the process. PTRC meetings will be used as alternative engagement opportunities to share findings and solicit feedback from residents. Task 2.7: Steering Committee Meeting No. 2 The planning team will evaluate and summarize the community survey responses to better understand community needs and desires for the park and trail system. These findings will help guide final recommendations and the importance of improvements. PHASE 3: COMMUNITY NEEDS ASSESSMENT During this phase, we will use the data and input that has been collected and analyzed to evaluate what the community needs in its park system. This determination will be driven largely by the input we gather through various channels. We will assess the park system based on national trends and metrics, but one of the foremost important data points is what the community, city staff, and stakeholders tell us they need for Arden Hills to be successful. Our team intends to listen, learn, and uncover what those needs are. Task 3.1: Community Needs Evaluation Feedback and research collected and analyzed will be summarized for review. This information will be used to begin discussions about improvements, opportunities, and priorities. Task 3.2: Park and Trail Classifications The planning team will work with city staff to review and confirm, modify, or add to existing classifications, and preferred facility level of service standards. Facility standards include level of service standards and the population served per recreational facility and park amenities. These will be based on NPRA guidelines, our team's experience, and comparison with peer/survey agencies. 5 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNWORK PLAN Task 3.3: Draft Goals, Policies, and Initiatives Building on previous tasks, our team will develop a list of recommendations alongside city staff to address improvements to existing parks and facilities to assist with overall LOS. We will coordinate with the city to prioritize these recommendations based on needs as determined by existing conditions review, gap analysis, and expressed community desires. Task 3.4: Steering Committee Meeting No. 3 This steering committee meeting will be used to review draft goals, policies, and initiatives for the plan and prepare for Phase 4 of the planning process that will introduce plan recommendations. PHASE 4: IMPLEMENTATION PLANNING Our team will work with the city to prepare recommendations for improvements to Arden Hills' parks and recreation facilities. This includes improvements to existing park facilities, maintenance efficiencies, and trail connectivity opportunities. Part of this task will consist of developing implementation budgets to accompany improvement recommendations to seamlessly incorporate park system improvements into the city’s capital improvement plan (CIP) process. We will finalize the master plan and provide copies to the city for consideration and approval by the parks commission and city council. Task 4.1: Project Cost Estimating Our team will use the prioritized list of recommendations to prepare capital and operational costs, informing anticipated needs from identified improvements. We will note assumptions included in these efforts to assist the city better as they plan for refinement and future implementation. The costs will consider current construction costs and anticipated inflation estimates for mid- and long-term improvements. Based on comparison of the budget, relative to national averages and comparable communities, we will provide an analysis to establish the need to maintain the current LOS. Depending on their findings, our team will establish differing resource needs that would allow the city to provide adequate and desired LOS. Task 4.2: Develop Prioritized 10-Year CIP Building on previous tasks, our team will develop a list of recommendations alongside city staff to address improvements to existing parks and facilities. We will coordinate with the city to prioritize these recommendations based on needs as determined by existing conditions review, gap analysis, and expressed community desires. We will work with city staff to review recommendations and anticipated costs of CIP projects for upcoming funding cycles. Task 4.3: Funding and Implementation Plan The project team will review the existing budget of the department. The review will focus on the existing funding mechanisms the department has and revenue that is generated. The project team will also review recreation programs and events that are being offered by the city and assess if improvements or modifications could be made. The project team will share with the city the various traditional and non-traditional methods they could employ to implement the plan. As part of the implementation plan the project team will further refine numbers on development and operations, and how funding strategies can potentially offset costs. Task 4.4: Steering Committee Meeting No. 4 We will provide a working draft of the plan to the advisory committee prior to this meeting and take this time to discuss any comments and revisions as a step towards final revisions of the draft plan. Task 4.5: PTRC Commission Meeting No. 2 The second PTRC meeting will be used to present a draft of the recommendations, CIP, and implementation plan strategies for in from the commission members. 6 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNWORK PLAN PHASE 5: FINAL PLAN PREPARATION AND ADOPTION Work produced and documented throughout the planning process will be compiled into a user-friendly document. During this final phase of the project, we will finalize the master plan and provide copies to the city for consideration and approval by the PTRC and city council. Task 5.1: Draft Plan Preparation and Review We will develop a working draft of the master plan (80%) for the city and advisory committee to review to ensure the layout, formatting, and information prepared to date align with the city’s vision for this document. Task 5.2: Final Plan Preparation By considering the advisory committee’s feedback on the draft, we will enact changes to finalize the master plan document for a final review by the city. Any redlines will be addressed before present to the PTRC and city council. Task 5.3: PTRC Approval and Recommendation We will prepare a presentation reviewing the process, highlighting master plan findings, and listing identified priorities for consideration of approval by the PTRC. Task 5.4: City Council Approval Upon acceptance by the PTRC, our team will present the master plan to the city council for consideration of adoption. 7 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNWORK PLAN TIMELINE We have developed a schedule detailing the anticipated work tasks, task relationships, critical path timeline, deliverable due dates, and completion dates. This schedule is based on our review of the project background, description, knowledge on project timing to maintain focused engagement, and scope of services requested. Bolton & Menk will work with city staff and other project partners to revise and update this schedule as needed to ensure successful project delivery. Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12 EXISTING CONDITION INVENTORY AND ANALYSIS PUBLIC ENGAGEMENT COMMUNITY NEEDS ASSESSMENT IMPLEMENTATION PLANNING FINAL PLAN PREPARATION AND ADOPTION 8 Weeks 8 Weeks 8 Weeks 24 Weeks 2 Weeks 30 Weeks 8 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNWORK PLAN Project Advisory Committee Casey Byers, PLA Principal-in-Charge Aus Perez Landscape Designer Anna Springer, PLA Lead Park Planner Bryce Shearen, CPRE Project Manager Katherine Gould, PLA, ASLA Landscape Architect/Community Engagement Lead Ashley Hudson, AICP Funding Specialist Dan Donayre, MWPCP, PWS Natural Resources Specialist David Malm, GISP GIS Specialist OUR TEAM The Bolton & Menk team includes experts with a wide range of experience in landscape architecture, planning, and park and recreation administration, culminating in a distinctly specialized set of skills that will be applied to the development of a system plan that meets the vision and needs of the City of Arden Hills, its residents, and visitors. In addition to these individuals, the Bolton & Menk team also has the support of more than 1,000 Bolton & Menk staff members who can provide additional insight to address any unique challenge or opportunity that arises during the project. 9 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNOuR TEAM BRYCE SHEAREN, CPRE Project Manager As a parks and recreation strategic development specialist, Bryce will provide overall project management for the project. He will be the main point of contact for city staff for the duration of the planning effort. Bryce will be responsible for leading the effort and the team. He will establish the project schedule and oversee deliverables, ensuring project goals are met on time and within budget. CASEY BYERS, PLA Principal-in-Charge Casey will use his industry experience to provide project oversight and ensure the recommendations fit within the City of Arden Hills' vision. Bryce began his career in parks and recreation in 2007 and has managed numerous short and long-term park planning projects. Bryce’s expertise lies in community engagement, park and recreation planning, implementation, maintenance, and operations. As a former parks and recreation director, he uses his first-hand knowledge of local government and parks and recreation department leadership to inform his approach to working with communities. His experience in budgeting, funding, planning, and the development of guiding documents guides his approach to delivering positive and multifaceted plans and projects. Bryce is also an advocate for inclusive and universal park and recreation offerings and creating spaces for communities to grow, gather, and learn. Casey is a principal landscape architect with 19 years of experience. He focuses on helping communities plan and implement community- centric projects. His experience in parks and recreation, urban design, corridor planning, and long-range planning spans the project life cycle from concept development through construction and operations. His ability to build community support through conscious design, timeliness, and effective public facilitation has led to the successful adoption of many projects backed by community consensus. A practice area leader for planning and urban design at Bolton & Menk, he finds great reward in helping communities realize their visions; helping convey the value of quality, technically sound, and environmentally conscious design to the public. Casey believes in a thorough design process that explores outside-the- box opportunities but also has long-term, maintainable solutions. Education Bachelor of Landscape Architecture, Iowa State University Credentials Professional Landscape Architect - IA, MN, CO Project Experience • Park System Plan, Robbinsdale, MN • Park System Plan, Lake Elmo, MN • Sechler Park Long-Range Plan, Northfield, MN • Park System Plan, Empire, MN • Pioneer Park Improvements, Little Canada, MN • Arden Oaks and Freeway Park Engagement and Planning, Arden Hills, MN • 2025 Park Improvements, Arden Hills, MN • Park System Plan, Little Canada, MN* • Pioneer Park Phase I Planning, Design, and Construction, Little Canada, MN* • Rondeau Park All-Inclusive and Accessible Park Enhancements, Little Canada, MN* Project Experience • Park System Plan, Robbinsdale, MN • Master Parks and Trail Plan, Wabasha, MN • Park System Plan, Empire, MN • Crear Creek Point Park Master Plan, Coralville, IA • Park System Plan, Empire, MN • Deep Lakes Park Master Plan, Muscatine County, IA • Parks Master Plan, Windsor Heights, IA • Central Park Master Plan, Jones County Conservation District (IA) • Park System Master Plan, Blue Earth, MN • Prairie Pointe Park Master Plan, Elkhart, IA • Sturges Park Master Plan, Buffalo, MN • Greenways Master Plan, Norwalk, IA *While at a previous employer Education Bachelor of Science - Business Administration and Management, University of Wisconsin - River Falls Master of Public Administration, Hamline University Credentials Certified Park and Recreation Executive - CPRE, National Recreation and Park Association 10 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNOuR TEAM ANNA SPRINGER, PLA Lead Park Planner Anna will work collaboratively with the team to inventory, analyze, and prepare recommendations for the park and recreation system. AUS PEREZ Landscape Designer Aus will work collaboratively with the team to develop high- quality, easily interpreted plans, graphics, and communication materials, including maps and system analysis. As a senior project landscape architect with 13 years of experience, Anna is responsible for the successful completion of park and recreation system plans, trail, greenway and open space plans, and long-range park planning projects. Her expertise includes park system planning principles, recreational needs assessments, site inventory and analysis, community engagement, report writing, and site design from concept to documentation/ implementation. Anna uses her experience and skills to help communities develop and achieve their vision for their parks and recreation system by uncovering needs and outlining a clear path to implementation. Aus is a landscape designer at Bolton & Menk with 5 years of experience. Their responsibilities include assisting with the development of project deliverables, project-related graphics, final report documents, meeting materials, and other landscape architectural renderings and visualizations. Combining technical experience with creativity to help develop long-lasting, beloved community spaces is what drives Aus in their every day efforts. Education Bachelor of Landscape Architecture, University of Nebraska - Lincoln Project Experience • Park System Plan, Robbinsdale, MN • Park System Plan, Lake Elmo, MN • Park System Plan, Empire, MN • Colby Park Design, Windsor Heights, IA • Sechler Park Long-range Plan, Northfield, MN • Parks, Arts, and Recreation System Plan, Monticello, MN • Parks and Recreation System Master Plan, Maplewood, MN* • Park System Master Plan, Little Canada, MN* • Parks and Recreation System Master Plan, Rochester, MN • River to River Greenway Master Plan, Dakota County, MN * Project Experience • Park System Plan, Robbinsdale, MN • Sechler Park Long-Range Plan, Northfield, MN • Park System Plan, Empire, MN • Park System Plan, Lake Elmo, MN • Parks and Trails Master Plan, Wabasha, MN • Pioneer Park Master Plan and Final Design, Little Canada, MN • Ironwood Park Expansion, Carver, MN • Purgatory Park Master Plan, Minnetonka, MN • Pioneer Park Master Plan and Final Design, Little Canada, MN *While at a previous employer Education Bachelor of Science - Natural Resources, University of Wisconsin - Stevens Point Master of Landscape Architecture, University of Minnesota - Twin Cities Credentials Professional Landscape Architect - MN 11 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNOuR TEAM KATHERINE GOULD, PLA, ASLA Landscape Architect/Community Engagement Lead Katherine will collaborate with stakeholders, gather public input, and integrate these perspectives into the park's final design, ensuring the project reflects the community's needs and aspirations. DAN DONAYRE, MWPCP, PWS Natural Resources Specialist Dan will oversee the natural resource assessments and coordinate with regulatory agencies to ensure compliance with environmental standards. Katherine is a project landscape architect at Bolton & Menk who began her career in 2016. She has contributed to the design of parks, streetscapes, trails, and community gathering spaces across the Midwest. Through these professional experiences and as a grassroots climate activist, Katherine has come to believe that consideration for the health of natural systems is not just a feature, but a goal integral to every successfully designed landscape. Katherine is passionate about community engagement, culturally relevant design, and practicing landscape architecture as a means of promoting public health and environmental equity. Dan leads Bolton & Menk's natural resources team and is responsible for coordinating with state and federal agencies to work through difficult aquatic resource delineations and permitting. He has conducted hundreds of wetland delineations, GPS surveys, and both Wetland Conservation Act and Clean Water Act permits. Dan now focuses on natural resource restoration, including wetlands, prairies, streams, and pollinator habitats. Education Bachelor of Arts - Environmental Studies, University of North Carolina Credentials Professional Wetland Scientist - PWS Certified Minnesota Wetland Professional - CMWP Project Experience • Beltz Park Master Plan, Forest Lake, MN • Oakwood Park Master Plan, Cottage Grove, MN • Hazelnut Park Master Plan, Arden Hills, MN • 2022 Park Master Planning, Cottage Grove, MN • Hackberry Park Master Plan, Orono, MN • Rudy Johnson Park Master Plan, Anoka, MN • Highland Park Master Plan, Anoka, MN Project Experience • Judd Street Mitigation, Marine on St. Croix, MN • Clear Lake Water Quality Improvements, Forest Lake, MN • Minnesota River Greenway Trail, MnDNR • I-90 Off Site Wetland Delineation, MnDOT • North Mine Wetland Delineation, Unimin Corporation • Settlers Parkway, Buffalo, MN • Water Resource Management Plan, Ramsey, MN • TH 22 Mankato to Saint Peter Stream Impact Mitigation Plans, MnDOT • TH 93 Permitting Support, MnDOT Education Bachelor of Landscape Architecture, Iowa State University Credentials Professional Landscape Architect - MN American Society of Landscape Architects – ASLA 12 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNOuR TEAM ASHLEY HUDSON, AICP Funding Specialist Ashley will be responsible for securing and managing funding for the project, ensuring financial resources are effectively used. DAVID MALM, GISP GIS Specialist David will apply his expertise in GIS to support the Arden Hills Park Master Plan project, ensuring accurate spatial data and analysis. Ashley has the qualifications, experience, and funding knowledge to effectively develop and deliver aggressive comprehensive funding plans and ultimately win competitive funding requests. Since beginning her career in 2011, Ashley has developed a range of skills as a transportation planner. She fills multiple roles on an assortment of projects, including transportation corridor studies and designs, regional system planning, and persuasive project funding initiatives. As the leader of Bolton & Menk's transportation funding service, she is very engaged with how projects are funded within an agency’s planning and budget and a wide array of competitive sources. Dave is a GIS project manager who began his GIS career in 2015. He provides GIS services to internal and external clients and assists in creating and maintaining databases, map development, and asset management. He also creates, develops, and maintains various web mapping applications and handles project set-up, data collection, and data processing for high-accuracy GPS collection projects. Dave loves being able to provide a high-quality solution. He has extensive experience working with Esri GIS software and is experienced with AutoCAD Civil 3D, Microstation, and other design software. Education Associate of Applied Science - Civil Engineering Technology South Central College Credentials Geographic Information Systems Professional – GISP Project Experience • River Oaks Park Master Plan, Big Lake, MN • Lakeside Park Master Plan, Big Lake, MN • Friederichs Park Master Plan, Eden Valley, MN • Eldorado Park Master Plan, Clearwater, MN • Parks and Trail Master Plan, Wabasha, MN • Comprehensive Parks and Trail Plan, Rice, MN • Parks and Trails Master Plan, Forest Lake, MN Project Experience • Veteran's Park Master Plan, Cokato, MN • Sidewalk and Trail Master Plan, Watertown, MN • Big Island Master Plan, Orono, MN • Municipal Utility Mapping, Two Harbors, MN • Pavement Evaluation, Rushford, MN • Web GIS Application, Winnebago, MN • Municipal Utility Mapping, Rushford, MN • Database Development, Red Lake Falls, MN Education Master of Science - Urban and Regional Planning, Minnesota State University, Mankato Bachelor of Science - Landscape Architecture Environmental Design, North Dakota State University Credentials Certified Planner – AICP 13 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNOuR TEAM PROPOSED FEE The following table summarizes the hours and cost breakdown for each major work task item. The estimated fee includes labor, general business, and other normal and customary expenses associated with operating a professional business. Unless otherwise noted, the fees include vehicle and personal expenses, mileage, telephone, survey stakes, and routine expendable supplies; no separate charges will be made for these activities and materials. Expenses beyond the agreed scope of services and non-routine expenses, such as large quantities of prints, extra report copies, out-sourced graphics and photographic reproductions, document recording fees, outside professional and technical assistance, and other items of this general nature will be invoiced separately. PHASE 1: EXISTING CONDITION INVENTORY AND ANALYSIS FEE $17,000 $7,700 $22,000 $4,200 $13,000 $15,200 $3,500 $74,900 $2,200 $9,900 $84,800 PHASE 2: PUBLIC ENGAGEMENT PHASE 3: COMMUNITY NEEDS ASSESSMENT TASK 2.3: ENHANCED SURVEY AND PROJECT MARKETING PHASE 4: IMPLEMENTATION PLANNING TASK 2.3: INTERACTIVE COMMUNITY MAP PHASE 5: FINAL PLAN PREPARATION AND ADOPTION SUBTOTAL ALTERNATE SERVICES SUBTOTAL COMBINED TOTAL TASK 2.3: YOUTH ENGAGEMENT ALTERNATIVE SERVICES 14 PARK SYSTEM PLAN | CITY OF ARDEN HILLS, MNPROPOSED FEE Bolton & Menk's web-based comment mapping tool, INPUTiDTM, is an interactive way to receive feedback from the public. This customizable application can be used to collect feedback on layouts, design options, construction staging and more. Each participant can explore the content and add comments directly on the map, tying the comment to a specific location. People will also be able to view, like, and respond to other comments. This process identifies key issues and trends, which ultimately are reported out to the project team. We can customize the header to reflect client branding The comment names and icons can be customized Users can toggle between base maps We can add tabs that show different concepts The base map can be blank, or we can add design linework INPUTiD: COMMENT MAPPING CHECK OUT THE INTERACTIVE SALES TOOL Visit the site: arcg.is/10G4mz SIGNAGE & DECALS Project signage and sidewalk decals allow people to discover the project in common spaces such as parks, business districts, trails and more. These eye-catching displays are placed at key places to generate interest and discussion about the project. They often contain a QR code or URL that links to the website, survey or other important online materials. SIGNAGE SIDEWALK DECAL Page 1 of 3 AGENDA ITEM – 3B MEMORANDUM DATE: March 10, 2025 TO: Honorable Mayor and City Councilmembers FROM: Jessica Jagoe, City Administrator SUBJECT: Zoning Code Update Discussion Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Council should discuss and provide direction to staff on zoning code updates within HKGi Summary of Work Session #1 memo and recommendations brought forward for consideration. Background At the February 5th Planning Commission meeting, the consultants from HKGi presented their first memo for the zoning and subdivision ordinance revisions that focused on the foundational elements upon which the rest of the ordinances will be built. There were five broad topics that were discussed. Included with this memo as Attachment A is the summary memo prepared by HKGi that provides comments and recommendations for City Council consideration. This process is currently in Phase 3, which is when the technical updating and drafting of regulations occurs. As part of the tasks in this phase, the consultants will prepare minor code update language for the Planning Commission and City Council. Based on the Council feedback, HKGi will also start in this phase to conduct community engagement, including online mapping tools, creation of a project page on City’s website, community in-person events, and/or other outreach tools. Page 2 of 3 As a next step, staff is looking for direction from the City Council on the proposed zoning code revisions from HKGi. This feedback will be shared with the consultants and incorporated into the draft ordinance language that is being prepared. Items for discussion include consideration of the following: • Base Zoning Districts – Below is the table of existing and proposed base zoning districts. • District Purpose Statements - In line with the changes to the base zoning districts shown above, HKGi is recommending updated purpose statements that are simplified, removes references to specific standards, and better match how the districts are being applied within the city. • Expanded Access to Housing – HKGi has prepared the proposed use table for residential zoning districts. The consultants are not proposing to remove Conditional Uses altogether but are recommending that the City consider transitioning to Permitted with Standards. This would allow the City to apply the same conditions and would remove some barriers to development (i.e. application review time and expense). o Permitted Use has few additional standards beyond the usual lot and site requirements such as lot size, yard setbacks, height, impervious coverage, etc. o Conditional Use requires a public hearing to ensure that any potential impacts to surrounding properties are mitigated through conditions that are tailored to the specific use and circumstances. o Permitted with Standards do not require a public hearing but do have additional performance requirements listed in code that must be evaluated by Planning staff to ensure they are being met before a proposed project may apply for a building permit. o Additionally, the City Council should provide direction on Accessory Dwelling Units (ADUs) or tiny homes being included in the land use table. ADUs were discussed briefly at the October 28, 2024, Joint Work Session with the Planning Page 3 of 3 Commission. There was Council consensus on seeing some of the data and bringing this back to the City Council for further discussion on whether these standards should be a part of the zoning code. Ordinance development and review of ADUs is not currently a part of the zoning code update process and will be a separate topic given the number of considerations that need to be factored into considering this housing option. The Planning Commission at their meeting on February 5th was supportive of the Council moving forward with the potential incorporation of this housing option. Attachment B is a summary of other cities that allow ADUs. If there is Council direction and interest in pursuing this topic further, staff would bring back additional research at a future work session for a more robust discussion. • Lot and Site Standards - HKGi made several recommendations related to the existing District Requirement Chart to simplify the information for how it is presented to the end user (Attachment C and D). At their April 9th meeting, the Planning Commission will receive a second presentation from HKGi on the non-residential portion of the use table and will also examine specific development standards such as parking, landscaping, fencing, outdoor lighting, and signage. Additionally, draft code language associated with the topics from this memo (except ADUs) will be shared with the Planning Commission for further refinement. Budget Impact N/A Attachment Attachment A – HKGi Summary Memo Attachment B – ADU Research Summary Attachment C – Draft Lot Requirement Table Attachment D – Draft Site Standards Table HKGi 800 Washington Ave N Suite 207, Minneapolis, Minnesota 55401 (612) 338-0800 ~ www.hkgi.com CITY COUNCIL SUMMARY MEMO TO: Arden Hills City Council FROM: Jason Zimmerman and Kendra Ellner, Consulting Planners DATE: February 17, 2025 SUBJECT: Summary of Work Session #1 – Zoning Ordinance Update OVERVIEW On February 5th, HKGi held the first work session with the Planning Commission to discuss various recommended updates to the City’s Zoning and Subdivision ordinances. The report to the Planning Commission is attached. This summary memo is intended to brief the City Council on the material presented, the questions and discussions that occurred, and the general direction offered by the Planning Commission. WORK SESSION TOPICS Five broad topics were discussed at the first work session; the discussion around each will be summarized in turn: • Base Zoning Districts • District Purpose Statements • Expanding Access to Housing • Lot and Site Standards • Accessory Dwelling Units Base Zoning Districts HKGi recommended that the B-1 and I-2 zoning districts be eliminated due to the large number of zoning districts generally and the infrequency with which these two have been used. The sole site zoned I-2 could be rezoned to I-1, and any concerns related to outdoor storage could be addressed through use specific standards for lumberyards. The Planning Commission supported this recommendation. A second recommendation was to rename/rebrand the B-3 and B-4 zoning districts, as the uses located there are not consistent with the stated purposes. It was recommended the B-3 district be renamed the Corridor Business zoning district and the B-4 district be renamed the Business Park zoning district. Planning Commissioners also supported this recommendation, stating that the naming and purposes of these two districts had often been confusing. Finally, HKGi suggested modifying the names of the residential zoning districts to remove the focus on housing types and instead make the names more descriptive. Similarly, it was recommended that the B-2 district, which allows a mix of uses, would be better served by being renamed as a Mixed Use district. The Planning Commission supported these recommendations. City Council Summary Memo – Work Session #1 – Zoning Ordinance Update– February 17, 2025 2 A reworked list of zoning districts that followed the recommendations would be listed as follows: Revised District List Suburban Residential 1 R-1 Suburban Residential 2 R-2 Mixed Residential R-3 Attached Residential R-4 Mixed Use MU Neighborhood Business NB Corridor Business CB Business Park BP Gateway Business GB Limited Industrial I-1 I-FLEX I-FLEX Civic Center CC Institutional INST Parks and Open Space POS Conservation CD District Purpose Statements In line with the recommended changes to the base zoning districts, HKGi offered updated purpose statements that were simplified, removed references to specific standards, and better matched how the districts were being applied within the city. One key change included bringing the Civic Center zoning district into alignment with how it is currently being used – as locations for government facilities and services – and removing some of the visionary language that described a district that included retail, educational, and residential uses. If this vision for the area around City Hall resurfaces in future Comprehensive Plans, the description and uses allowed in this zoning district could be amended. Until then, a clearer approach keeps the language focused on current usage. A full list of the proposed purpose statements can be found in the attached memo. Expanding Access to Housing In response to stated desires to increase access to housing throughout the city, HKGi shared a number of photos and diagrams that described various housing types across a variety of scales and densities. The existing table for residential uses was shown, and some of the current housing definitions were explored. The conclusion was that the existing regulations are confusing at best and overly restrictive as worst. HKGi introduced the idea of omitting Planned Unit Developments (PUDs) from the use table, as a PUD is a zoning tool that allows deviations from base zoning standards and can be applied to any use or district. City Council Summary Memo – Work Session #1 – Zoning Ordinance Update– February 17, 2025 3 Following this overview, Commissioners were provided an empty use table and asked to populate it with their preferred housing types for each district, as well as the type of approvals they felt were appropriate for each type. HKGi collected these individual responses and aggregated them into a table (shown below) that captures the areas of agreement and disagreement among Commissioners. Using this information, along with knowledge of current trends and best practices in housing, HKGi has drafted a proposed use table for consideration going forward (also shown below). Methodology: After each Planning Commissioner’s sheet was collected, each column was reviewed and counted towards the selected permission in each cell. These selections were then tallied and compared to the total responses. The final results have been color-coded based on the majority selected permission, however some were split and denoted with a ( | ). The final recommendations were derived from these responses and aligned with HKGi best practices. Green = All or majority consensus Yellow = Some Consensus Red= No consensus PROPOSED USE TABLE – PLANNING COMMISSION RESPONSE SUMMARY Use R-1 R-2 R-3 R-4 Single-unit Dwelling P P P P|- Duplex PS P P P|- Twinhome PS P P P|PS Cottage Courtyard P|C P P P|PS Townhome/Rowhouse - P|PS|- P P Multi-unit Dwelling (small scale) - - P P Multi-unit Dwelling (large scale) - - - P | PS (in mixed use district) Other Suggestions (individual responses) Accessory Dwelling Unit P P PS PS Tiny Houses P P PS PS Student Housing - PS P P City Council Summary Memo – Work Session #1 – Zoning Ordinance Update– February 17, 2025 4 Permission Options: P = Permitted Use PS = Permitted with Standards C = Conditional Use - = Prohibited PROPOSED USE TABLE – HKGI RECOMMENDATIONS Use R-1 R-2 R-3 R-4 Single-unit Dwelling P P P - Duplex PS P P - Twinhome PS P P - Cottage Courtyard PS PS PS - Townhome/Rowhouse - PS P P Multi-unit Dwelling (small scale) - - P P Multi-unit Dwelling (large scale) - - - P There were questions and general discussion around the following topics: • What is a cottage courtyard development? A cottage courtyard development is a collection of smaller single-unit dwellings that are clustered around a shared open space or parking area. Front entrances to the dwellings are typically oriented towards the shared courtyard (see image example below). City Council Summary Memo – Work Session #1 – Zoning Ordinance Update– February 17, 2025 5 • Should ADUs, tiny homes, and student housing be included in this table? ADUs are being considered separately and are not currently a housing option in Arden Hills. Similarly, tiny homes are a use that has not been considered as a housing option, but could conceivably be part of a Planned Unit Development. This type of housing does come with certain unique building code requirements. Housing restricted to student use will be addressed as part of the Institutional zoning district in the expanded use table. • What about housing in the Mixed Use and Neighborhood Business districts? Both of these districts currently allow limited housing. When the expanded use table is shared as part of Work Session #2, the full range of uses allowed in each district – including residential uses – will be listed. • How does “Permitted with Standards” differ from “Permitted” and “Conditional” uses? Typically, a Permitted use has few additional standards beyond the usual lot and site requirements such as lot size, yard setbacks, height, impervious coverage, etc. A Conditional use, on the other hand, requires a public hearing to ensure that any potential impacts to surrounding properties are mitigated through conditions that are tailored to the specific use and circumstances. Uses that are Permitted with Standards do not require a public hearing, but do have additional performance requirements listed in code that must be evaluated by Planning staff to ensure they are being met before a proposed project may apply for a building permit. For example, if a cottage courtyard use was Permitted with Standards, one of the standards might be “A minimum distance between dwelling units shall be 12 feet.” If staff confirmed this requirement was satisfied, the project could proceed without additional hearings. While HKGi is not proposing to remove Conditional uses altogether, reducing the number of conditional use permits to which the city typically applies the same conditions and transitioning them to Permitted with Standards would remove some barriers to development. Lot and Site Standards HKGi made a number of recommendations related to the existing District Requirement Chart in an effort to simplify the information presented. Key recommendations included: 1. Split the District Requirement Chart into at least two separate tables (Lot Requirements and Site Standards) 2. Consider eliminating the “Minimum Lot Depth” standard 3. Eliminate Floor Area Ratio (FAR) as a standard 4. Reduce “Minimum Corner Side Yard Setbacks” for R-1, R-2, and R-3 districts 5. Simplify setbacks from some other uses and convert to table footnotes: building setbacks from State Highways or County Roads, shoreland setbacks, building setbacks from abutting residential districts 6. Remove accessory structure setbacks from the table and address separately City Council Summary Memo – Work Session #1 – Zoning Ordinance Update– February 17, 2025 6 7. Eliminate the “Maximum Dwelling Unit Density per Net Acre” standard Commissioners talked through removal of FAR as a standard and the proposed reduction in the Minimum Corner Side Yard Setbacks and agreed with both. Previews of new Lot Dimension and Site Standard tables were shared and a few ideas for refinement were offered by Commissioners. Updated tables will be shared at the next work session. Accessory Dwelling Units HKGi provided a general overview of what Accessory Dwelling Units (ADUs) are, pros and cons of allowing them, and how they might be incorporated into the fabric of housing within a community. It was made clear that any decision to move forward with considering ADUs would need to come from the City Council and would likely need to include a broad community engagement effort. Commissioners voiced general support for the idea of ADUs, but expressed caution around things like parking and impervious coverage on existing lots. The City Council should determine if a community conversation around ADUs is appropriate and, if so, when it should occur. HKGi will prepare the updated zoning code in a way that will allow for ADUs to be inserted seamlessly if they are eventually approved. NEXT STEPS The second work session, tentatively scheduled for April, will focus on the non-residential portion of the use table and will also examine specific development standards such as parking, landscaping, fencing, outdoor lighting, and signage. Draft code language associated with the topics that were discussed at the first work session will be shared with the Planning Commission. ATTACHMENT • Memo to the Planning Commission dated February 5, 2025 HKGi 800 Washington Ave N Suite 103, Minneapolis, Minnesota 55401 (612) 338-0800 ~ www.hkgi.com PLANNING COMMISSION REPORT TO: City of Arden Hills Planning Commission FROM: Jason Zimmerman and Kendra Ellner, Consulting Planners DATE: January 27, 2025 SUBJECT: Zoning and Subdivision Ordinance Revisions – Work Session #1 MEETING DATE: February 5, 2025 OVERVIEW HKGi was selected by the City of Arden Hills to complete an update to the existing Zoning and Subdivision ordinances. The Planning Commission, as the body most involved with the application of the code, will help conduct a technical review of the proposed changes and provide recommendations to the City Council. The first work session will cover some of the foundational elements upon which the rest of the ordinances will be built – base zoning districts, residential uses, and the required lot and site standards. BACKGROUND The current zoning and subdivision ordinances were adopted in 1993 but have been amended several times since – occasionally resulting in inconsistencies and poor formatting. In addition, procedures and some content need to be updated to reflect modern administration and new tools and technologies. HKGi has conducted a full evaluation of the current code and will be working throughout 2025 to meet with the Planning Commission and City Council in order to revise the organization and contents of the zoning and subdivision chapters. The project has been broken down into four phases: Phase 1 – Project Kick Off and Understanding [COMPLETE] Phase 2 – Diagnose the Current Ordinances and Frame Approach [COMPLETE] Phase 3 – Prepare Draft Codes Work Session #1 – Zoning Districts and Uses [WE ARE HERE] Work Session #2 – General Development Standards and Provisions Work Session #3 – Development Procedures and Subdivision Regulations Phase 4 – Final Ordinance Adoption and Implementation HKGi prepared a document that summarizes the state of the current ordinances and proposes changes to improve the structure and content – the Zoning and Subdivision Code Diagnosis Report. This document was shared by City staff. Each work session with the Planning Commission will be focused on a handful of topics. The City Council will be briefed after each meeting on the discussion and recommendations of the Planning Planning Commission Meeting – Zoning and Subdivision Ordinance Revisions – Work Session #1 – February 5, 2025 2 Commission. Targeted stakeholder groups will be involved throughout the year as needed to provide input on various topics. Consideration and adoption of the new code is anticipated for late fall of 2025. WORK SESSION TOPICS There are five broad topics that will be discussed at the first work session: • Base Zoning Districts • District Purpose Statements • Housing Types • Lot and Site Standards • Accessory Dwelling Units Base Zoning Districts Arden Hills currently has 17 different base zoning districts. This number is high compared to the typical number of districts in peer communities in the Twin Cities. There are four residential districts, which is a typical number. There are six commercial/business districts; three to four is a more common number. Unless there is a good reason to keep each district, and a clear difference between each of them, the code would benefit from reducing the number of districts overall – and the number of business districts specifically. At the beginning of the code rewrite process, there were two zoning districts in the city that each had only one site so designated – B-1 and I-2. Since that time, the single property zoned B-1 has been rezoned. Given the large number of zoning districts, and the infrequency with which these two categories have been used, HKGi is recommending they both be eliminated. The single site zoned I-2, which is the lumberyard on Hwy 10, could be rezoned to I-1. Any concerns about outdoor storage of materials at this location could be addressed as those standards are updated in the code generally. Originally, there was thought of combining the B-3 and B-4 zoning districts into one new district as these two seems to serve similar purposes, have a small number of parcels zoned within each, and the two districts sit adjacent to each other. However, with the recent decision by the City Council to only allow cannabis retail sales in the B-4 district, it is best to keep these two districts separate. Currently, the B-3 district is called the Service Business District, even though the uses that are currently there are primarily focused on retail. The B-4 district, on the other hand, is called the Retail Business District but has little to no retail and instead contains a number of service businesses such as print shops, contracting services, supply and distribution companies, and indoor recreation. Assuming the preference of the City is to continue to encourage these uses in their current configuration, HKGi is recommending name changes to these districts to make it clearer how they are intended to be used. Since the B-3 district provides retail options along a major arterial, it is recommended it be renamed the Corridor Business district. The B-4 district functions as a typical business park in the way it accommodates multiple businesses in multi-tenant buildings with a focus on providing services or other non-retail operations. It is recommended to be renamed the Business Park district. Planning Commission Meeting – Zoning and Subdivision Ordinance Revisions – Work Session #1 – February 5, 2025 3 Comparison of Existing and Proposed Districts Current Districts Proposed Districts Single Family Residential R-1 Suburban Residential 1 R-1 Single Family and Two Family Residential R-2 Suburban Residential 2 R-2 Townhouse and Low Density Multiple Dwelling R-3 Mixed Residential R-3 Multiple Dwelling R-4 Attached Residential R-4 Neighborhood Business NB Neighborhood Business NB Limited Business B-1 --- --- General Business B-2 Mixed Use MU Service Business B-3 Corridor Business CB Retail Center B-4 Business Park BP Gateway Business GB Gateway Business GB Civic Center CC Civic Center CC Limited Industrial I-1 Limited Industrial I-1 General Industrial I-2 --- --- I-FLEX I-FLEX I-FLEX I-FLEX Parks and Open Space POS Parks and Open Space POS Conservation CD Conservation CD Institutional INST Institutional INST District Purpose Statements Within the zoning chapter, each district includes a statement of purpose which helps describe what sorts of uses should be allowed and how it fits into the overall landscape of the city. Based on the changes recommended by HKGi (the elimination of two of the lesser-used districts), as well as the renaming of two or more of the base districts, the following purpose statements are being proposed. Generally, the changes incorporate these four principles: 1. Move away from residential districts labeled with housing types. 2. Clarify the purposes of the B-3 and B-4 districts and rename to better align with the existing and desired uses. 3. Revisit the Civic Center District to ensure the zoning matches the City’s vision. 4. Overall, keep the focus on the purpose of the districts and the sorts of uses allowed or characteristics envisioned – remove references to how standards will be applied or how the districts will function. R-1: Suburban Residential 1 The purpose of the Suburban Residential 1 District (R-1) is to provide areas for single-unit and two-unit dwellings, as well as for senior housing, or for institutional uses such as schools or places of worship in settings that are compatible with the surrounding neighborhood. Planning Commission Meeting – Zoning and Subdivision Ordinance Revisions – Work Session #1 – February 5, 2025 4 R-2: Suburban Residential 2 The purpose of the Suburban Residential 2 District (R-2) is to provide areas for a mixture of single-unit and two-unit dwellings, as well as for senior housing, or for institutional uses such as schools or places of worship in settings that are compatible with the surrounding neighborhood. R-3: Mixed Residential The purpose of the Mixed Residential District (R-3) is to provide areas for single-unit and two-unit dwellings; attached housing, including twinhomes, townhomes, small-scale multifamily buildings; and senior housing. Schools and places of worship may be permitted in settings that are compatible with the surrounding neighborhood. R-4: Attached Residential The purpose of the Attached Residential District (R-4) is to provide areas for attached housing, including multifamily buildings and senior housing. Schools and places of worship may be permitted in settings that are compatible with the surrounding neighborhood. MU: Mixed Use The purpose of the Mixed Use District (MU) is to serve as a mixed use area in which to live, work, or recreate within a compact and architecturally enhanced setting. This district supports a wide range of compatible residential, retail, service, office, and institutional uses. Site standards encourage pedestrians and bicyclists and the creation of places for people to gather and socialize. NB: Neighborhood Business The purpose of the Neighborhood Business District (NB) is to provide areas for limited and compatible retail, service, and office uses, along with small-scale mixed use buildings that may include dwelling units. Development should encourage pedestrian, bicycle, and public transportation access. CB: Corridor Business The purpose of the Corridor Business District (CB) is to accommodate the transactions of a broad range of goods and services to meet the needs of the surrounding community, as well as the needs of passing motorists due to proximity to arterial streets or highways. BP: Business Park The purpose of the Business Park District (BP) is to provide a centralized location for multiple- occupancy buildings that are able to serve a wide variety of uses, including supply and distribution, printing, contracting offices, and indoor sports and fitness. GB: Gateway Business The purpose of the Gateway Business District (GB) is to establish areas for unified, large-scale development of light industrial, office, warehouse, and research uses in close proximity to freeways. Planning Commission Meeting – Zoning and Subdivision Ordinance Revisions – Work Session #1 – February 5, 2025 5 I-1: Limited Industrial The purpose of the Limited Industrial District (I-1), is to provide areas where industrial uses may locate in order to present the fewest impacts to adjacent land uses. I-FLEX The purpose of the I-FLEX District is to allow for a variety of office, service, manufacturing, and other compatible uses that serve local and regional needs. Development should foster employment and complement the surrounding uses in terms of performance, character, quality, and appearance. CC: Civic Center The purpose of the Civic Center District (CC) is to accommodate intergovernmental facilities and uses that provide important public services to the community. Development should be compatible with adjacent uses and located on or in proximity to an arterial. INST: Institutional The purpose of the Institutional District (INST) is to establish areas for educational, residential, athletic, or recreational facilities to serve students on the campus of a post-secondary education institution. POS: Parks and Open Space The purpose of the Parks and Open Space District (POS) is to provide areas for publicly owned lands that have recognized outdoor recreational or open space resources, to support community health through the provision of active and passive outdoor recreational opportunities, to promote natural and ecological stewardship, and to conserve vital environmental resources. CD: Conservation The purpose of the Conservation District (CD) is to provide a "holding" zone for federally owned lands on the Arden Hills Army Training Site to ensure that future development is staged, maintains a sustainable level of public expenditures for utilities and services, and protects those areas generally determined to be unsuitable for development due to the presence of wetlands, floodplains, steep slopes, certain drainage and soil conditions, and critical wildlife habitat. QUESTIONS FOR DISCUSSION • Is there a clear vision for each of the City’s base zoning districts? • Do the names of each of the districts align with their purpose and how they are intended to be used? Expanding Access to Housing The need and desire to expand access to housing, particularly addressing missing middle housing, was emphasized in the survey responses from the City Council and Planning Commission, the October 2024 joint meeting, and HKGi’s diagnostic review of the code. Prioritizing this topic early in the code update Planning Commission Meeting – Zoning and Subdivision Ordinance Revisions – Work Session #1 – February 5, 2025 6 process establishes a foundation that informs other sections of the code, such as required lot and site standards. Currently, the use table in the existing code is restrictive in terms of the approval process, permitting only detached single-family homes by right (see the existing use table below). Other housing types require a conditional use permit (CUP) or must go through a Planned Unit Development (PUD) process, creating additional barriers such as increasing the time and cost for development. Additionally, the definitions of existing housing types are unclear. For example, multiple family dwellings are defined as "containing three or more attached units," but there is no distinction between the various types of multiple family dwellings (e.g., townhomes, fourplexes, small scale or large-scale apartments). The broad categories make it unclear which housing products would be acceptable in Arden Hills. Images of various precedent housing types will be shown during the work session. To clarify and simplify the housing options and align them with the city's intended character, HKGi will explore this topic further and discuss the City’s comfort with various levels of regulation. The existing use table below illustrates the existing options for housing in each district, along with the current type of approval. The proposed use table shows HKGi’s suggestion for a more detailed breakdown of housing types. An exercise during the meeting will help fill-in the types of approval in each district. Based on the discussions, the proposed use table will be refined and allow new standards to be incorporated into the updated zoning code. This will lead to right-sizing the lot and site standards for each district to accommodate these housing options. This approach will not significantly alter existing neighborhoods but will provide more flexible opportunities for redevelopment and also help meet the goal of increasing housing options. This, in turn, will influence affordability, community character, density, and other aspects of the zoning code. Existing Use Table Use R-1 R-2 R-3 R-4 Dwelling: single-family detached P P P P Dwelling: single-family attached C C PUD PUD Dwelling: two-family C C PUD PUD Dwelling: multiple family C C Table Legend: P = Permitted Use C = Conditional Use PUD = Permitted only through a Planned Unit Development Blank = Prohibited Planning Commission Meeting – Zoning and Subdivision Ordinance Revisions – Work Session #1 – February 5, 2025 7 Proposed Use Table Use R-1 R-2 R-3 R-4 Single-unit Dwelling Duplex Twinhome Cottage Courtyard Townhome/Rowhouse Multi-unit Dwelling (small scale) Multi-unit Dwelling (large scale) QUESTIONS FOR DISCUSSION • What housing types are appropriate for each of the residential zoning districts in Arden Hills? • What type of approval should be required for each? Lot and Site Standards Currently, most lot and site standards are contained within one large chart. The existing formatting lacks hierarchy, includes requirements that are redundant or may not be needed, and may feel overwhelming or confusing in terms of the amount of information provided. In addition, modified standards are listed elsewhere in the code, either within text that addresses specific districts or related to other circumstances such as land within the Shoreland Overlay. HKGi has a number of recommendations related to this section of code for residential uses: 1. Split the District Requirement Chart into at least two separate tables (Lot Requirements and Site Standards) 2. Consider eliminating the “Minimum Lot Depth” standard 3. Eliminate Floor Area Ratio (FAR) as a standard 4. Reduce “Minimum Corner Side Yard Setbacks” for R-1, R-2, and R-3 districts 5. Simplify setbacks from some other uses and convert to table footnotes: building setbacks from State Highways or County Roads, shoreland setbacks, building setbacks from abutting residential districts 6. Remove accessory structure setbacks from the table and address separately 7. Eliminate the “Maximum Dwelling Unit Density per Net Acre” standard Draft tables for lot requirements and site standards are included with this memo as a starting point for discussion, but may be revised as the districts and uses covered above are updated. Floor Area Ratio (FAR) Floor Area Ratio is a measure of the total floor area of a building compared to the total area of the lot. It is generally a way of controlling the mass or volume of a building, but does not regulate where on the lot the building may be located or how tall it can be. Planning Commission Meeting – Zoning and Subdivision Ordinance Revisions – Work Session #1 – February 5, 2025 8 An FAR of 1 could be represented in a few different ways. It could be a one story building that covers the entire lot (a 1:1 ratio), a two story building that covers half the lot (a 2:1/2 ratio which equals 1), etc. An FAR of 2 means there is twice as much floor area as lot area – a two story building that covers the entire lot is an example of this ratio. See the Met Council’s example graphic below: Because there is a great deal of variability between building shape and size with the same FAR, regulating the form may be better served by using a combination of three other standards already in the zoning code: setbacks, height, and lot coverage. Corner Side Yard Setbacks Staff and the City Council have indicated a desire to examine the current standard for corner side yard setbacks in residential districts, due to the number of variances that have been requested (and granted) in recent years. Corner lots have two yards that face streets. In Arden Hills, the shorter of the two street lot lines is determined to be the front yard, while the longer of the two street lines is determined to be the corner side yard. For all residential districts, the setback requirement for the corner side yard currently matches that of the front yard at 40 feet. Variance requests to reduce the corner side yard setback generally come as property owners look to expand their homes into this area. An examination of a number of other communities in the metro area shows that most of those researched have a reduced corner yard setback in relation to the front yard – though this is not the case for three communities immediately adjacent to Arden Hills. The reduced corner side yard is anywhere from 1/3 to 2/3 the size of the front yard setback, as shown in the table below: Planning Commission Meeting – Zoning and Subdivision Ordinance Revisions – Work Session #1 – February 5, 2025 9 Setbacks Requirements in Other Metro Cities City Front Yard Setback (ft) Corner Side Yard Setback (ft) Crystal 30 10 Columbia Heights 25 12 Edina 30 15 Golden Valley 35 May not reduce the remaining building envelope to less than 27 feet in width Little Canada 30 20 Minneapolis 20 8 Richfield 30 12 Robbinsdale 30 15, or 5 for 40 foot wide lots Roseville 30 10 St. Louis Park 25 15, or 9 for lots less than 60 feet wide Vadnais Heights 30 20 Mounds View 30 30 New Brighton 30 30 Shoreview 25 25 Arden Hills 40 40 The main reason to keep the corner side yard setback as large as the front yard setback is to maintain a wide viewshed from the public right-of-way. A primary reason to reduce the corner side yard setback is the argument from homeowners that this yard feels and functions as a side yard (not a front yard) and that by keeping it at 40 feet, the area on the lot in which they can build is limited compared to other lots on the block where the interior side yard setback may be as little as 5 feet. A secondary reason is that repeated variances to request a reduction of this requirement cost property owners and the City time and money. HKGi believes it in the interest of the city to reduce the corner side yard setback to 20 feet for single- unit dwellings, duplexes, and twinhomes in the R-1, R-2, and R-3 zoning districts. Looking at the past four variance requests that were made, two would have been allowed by right if this standard had been in place, while the remaining two requests were large enough they would still have needed to come to the City for consideration. Planning Commission Meeting – Zoning and Subdivision Ordinance Revisions – Work Session #1 – February 5, 2025 10 Recent Variance Requests Zoning Corner Side Yard Required (ft) Corner Side Yard Existing (ft) Corner Side Yard Variance Approved (ft) R-1 40 40.2 28.2 R-1 40 35.33 23.33 R-2 40 1.4 5.8 R-1 40 20 7.82 Maximum Dwelling Unit Density per Net Acre Residential densities are currently addressed in multiple places. The first is as part of the Comprehensive Plan – the Met Council requires metro communities to establish densities for all land uses as part of the future land use plan. Second, each of the residential zoning districts states the target residential density in its purpose statement. Third, the District Requirement Chart includes a standard for maximum density for all districts that allow residential uses. Finally, the minimum lot area per dwelling unit provides the same information in a slightly different form. The site standard chart can be simplified and made easier to use by reducing duplicative requirements. The residential portions of the two draft tables for Lot Requirements and Site Standards are included as attachments to this memo. QUESTIONS FOR DISCUSSION • Are there questions or concerns around any of the recommended lot and site standard changes? Accessory Dwelling Units In addition to the previous topic around housing types, accessory dwelling units (ADUs) offer a smaller- scale solution. ADUs are secondary dwellings on the same lot as a principal dwelling, with their own entrance, kitchen, living area, and bathroom. They are also known as in-law suites, granny flats, or carriage houses. Cities often consider ADUs for several reasons: • They provide housing in closer proximity for family members, students, the elderly, in-home health care providers, the disabled, and others. • Homeowners who create ADUs may benefit from added income and assistance with property maintenance. • They typically offer a lower cost of living, meeting the needs of existing and future residents within established neighborhoods while respecting architectural character and existing infrastructure. Planning Commission Meeting – Zoning and Subdivision Ordinance Revisions – Work Session #1 – February 5, 2025 11 • They provide a unique housing option for those whom want to downsize, but desire to stay within their existing neighborhood. Cities exploring ADUs often consider regulations on size, utilities, parking, occupancy, design, setbacks and construction. ADU construction can be detached, attached, or conversion/internal, demonstrated in the graphic below. HKGi is addressing this topic because it was highlighted as an area of interest to explore alongside expanding access to additional housing through the use table. The City Council has indicated it is an option they may explore in the future, but at this point the Planning Commission is not being asked to delve into the potential regulation. As the new code is drafted a placeholder will be carved out to allow ADUs to be added down the road following further discussions and more robust conversations and direction from the Council. QUESTIONS FOR DISCUSSION • What are the general reactions to the idea of ADUs in Arden Hills? NEXT STEPS Following Work Session #1, HKGi will draft revisions to the zoning code text and review the proposed changes with staff. A summary of the session will be forwarded to the City Council. Work Session #2 will focus on completing the updated use table (with nonresidential uses) and on specific development standards such as parking, landscaping, fencing, outdoor lighting, and signage. ATTACHMENTS • DRAFT Lot Requirement Table • DRAFT Site Standard Table There are at least 25 Twin Cities metro area communities allowing ADUs, including Apple Valley, Blaine, Bloomington, Burnsville, Crystal, Eagan, Fridley, Golden Valley, Hopkins, Inver Grove Heights, Lakeville, Long Lake, Minneapolis, Minnetonka, Mounds View, Orono, Plymouth, Richfield, Roseville, Stillwater, Shoreview, St. Louis Park, St. Paul, Wayzata and White Bear Lake. Ten cities from different areas of the metro have been consolidated here: City ADU Key Findings Links Apple Valley • Allowed on R-1 zoned lots 40,000 sq.ft. or more. • One ADU permitted per lot. • Conditional use permit required. • Conversion or attached ADUs only; No detached ADUs allowed. • Owner occupancy requirement. • Size shall be no more than 40% of the primary residence’s footprint or 900 sq. ft, but no less than 300 sq. ft. • Two additional parking stalls required. Communities for a Lifetime Accessory Dwelling Unit Guide Burnsville • Allowed in R1 and R1A zones. Minimum 10,000 square foot lot. • Owner occupancy requirement. • One ADU per lot. • Conversion or attached ADUs; No detached ADUs allowed. • No more than 50% of the primary residence’s footprint, but no less than 300 sq. ft. • Two additional parking stalls required. Communities for a Lifetime Accessory Dwelling Unit Guide Columbia Heights • Only allowed on lots with detached single- family houses. • Owner occupancy requirement. • Separate utilities required. • Must meet minimum parking requirements. Accessory Dwelling Units Crystal • Allows all forms of ADUs. • One ADU per single-family property. • Max size is 50% of finished floor area of primary dwelling except if ADU is in the basement. • Detached ADUs max height: 22 ft. • One additional parking space required. Accesssory dwelling units.indd • Utilities connection should be the same as home or separate connection at the same point on the property. Roseville • Allowed on lots with one-family dwellings. • Owner occupancy requirement. • Conversion or attached ADUs; No detached ADUs allowed. • Site meets the minimum parking standards for a single-family residential home. (four off- street parking spaces, two of which must be enclosed • ADU size: 75% of the principal dwelling’s floor area. Min 300 square feet, up to a maximum size of 600 square feet of living area. Microsoft Word - 110523_Accessory Dwelling Units Discussion _2_.doc Bloomington • ADUs are a permitted accessory use in the single-family residential district and not in any other district. • ADUs are only allowed on lots that meet the City’s minimum lot size (11,000 sq. ft.). • Site must meet the minimum off-street parking standards for a single-family home. • Minimum size of 300 sq. ft. and maximum of 960 sq. ft. • No more than two bedrooms allowed in the ADU. • ADUs must be attached to principal structure. ADUs are not allowed as detached structures. Accessory Dwelling Unit (ADU).pdf Shoreview • ADUs (termed “accessory apartments”) are permitted in the single-family residential districts and not in any other zoning district. • ADUs must have a minimum of 500 sq. ft with a maximum of 800 sq. ft. and two bedrooms. • Ownership occupancy requirement • Only one ADU permit will be issued per single-family home. Planning essentials accessory apartments Regulation Considerations: • Location • Lot Size • Quantity • Height • Number of occupants • Setbacks • A minimum of three off-street parking spaces must be provided, two of which shall be enclosed. Edina • Allows all forms of ADUs (attached, detached, internal/conversion). • Permitted only on single-family lots • One ADU permitted per property • An ADU shall not exceed 1,000 square feet of floor area • No minimum parking requirement Accessory Dwelling Units (ADUs) | Edina, MN Minneapolis • Allows all forms of ADUs (attached, detached, internal/conversion). • One ADU permitted per property. • Permitted on single or two-family lots. • If internal ADU, owner occupancy required. • Size: 300 sq ft – 800 sq ft. • Detached ADU max height: 21ft. • No minimum parking requirements. Accessory-Dwelling-Unit- Application.pdf Saint Louis Park • Allows all forms of ADUs (attached, detached, conversion). • One ADU per property. • Permitted only on single-family lots (R-1, R-2 and R-3 zoning districts). • ADU must be at least 200 sq ft; no more than 40% of gross floor area of principal building. • No minimum parking requirements; unless ADU is a garage conversion then applicant shall demonstrate that parking can be located in a structure or behind the front face of the house. • Requires owner occupancy. • Short term rentals (STRs) not allowed in an ADU. Accessory Dwelling Units | St. Louis Park, MN • Parking • Form • Entry requirements • Utility requirements • Landscaping • Independent sale of ADU • Home occupation • Shore term rentals • General rental • Impervious surface/building coverage • Regulation: Permitted with Standards (PS) or Conditional (C) • Design • Administration process: permitting, license, or registration etc.. Additional resources: • https://www.aarp.org/livable-communities/housing/info-2019/accessory-dwelling-units- adus.html • https://www.fhfund.org/report/adu/ Min. Lot Area Min. Lot Width Min. Lot Area per Dwelling Unit (sq ft)(feet)(sq ft) Single-unit Dwelling 14,000 95 14,000 Duplex 14,000 95 7,000 Twinhome 7,000 85 7,000 All other permitted uses 14,000 95 --- Single-unit Dwelling 11,000 85 11,000 Duplex 11,000 85 5,500 Twinhome 5,500 75 5,500 All other permitted uses 11,000 85 --- Single-unit Dwelling 11,000 85 11,000 Duplex 11,000 85 5,500 Cottage Courtyard 15,000 100 3,000 Townhome/Rowhouse 15,000 100 4,840 Multi-unit Dwelling 15,000 100 4,840 All other permitted uses 11,000 85 --- Multi-unit Dwelling 11,000 100 3,630 All other permitted uses 11,000 100 --- Townhome/Rowhouse 6,500 100 2,178 Multi-unit Dwelling 6,500 100 2,178 All other permitted uses 13,000 100 --- Duplex 11,000 85 5,500 Townhome/Rowhouse 15,000 100 4,840 Multi-unit Dwelling 15,000 100 4,840 All other permitted uses 13,000 100 --- MU NB Additional standards for lots within the Shoreland Overlay District are provided in Section 1330.03 Subd. 1. Where standards between the two sections conflict, the more restrictive standard shall apply. Zoning District Use R-1 R-2 R-3 R-4 Interior (b)Corner Single-unit Dwelling Duplex Twinhome* All other permitted uses 40 Single-unit Dwelling Duplex Twinhome* All other permitted uses 40 Single-unit Dwelling Duplex Cottage Courtyard Townhome/Rowhouse* Multi-unit Dwelling All other permitted uses Multi-unit Dwelling All other permitted uses Townhome/Rowhouse* Multi-unit Dwelling All other permitted uses Duplex Townhome/Rowhouse* Multi-unit Dwelling All other permitted uses 30 (c) *Adjoining units shall be permitted to utilize zero lot line interior setbacks (a) Reduced setbacks for covered front porches on single-unit dwellings, duplexes, and twinhomes are described in Section 13XX.XX (b) Minimum setback for any one yard / total setback of both yards (c) A vegetated buffer yard shall be provided adjacent to all residential uses outside the NB district 40 40 40 40 Front Yard (a)Rear Yard Side Yards Abutting Residential Use Zoning District Use Minimum Setbacks (feet) Maximum Height (ft) Max. Lot Coverage (structure) 35 25% R-2 40 30 5 / 15 20 ---35 R-1 40 30 10 / 25 20 --- 25% R-3 40 30 5 / 15 20 ---35 25% See Use Specific Standards 30 5 / 15 ---35 25% ---50 45% R-4 30 5 / 15 ---35 25% MU 50 20 10 / 20 20 35 35%NB 20 20 5 / 15 20 --- Min. Landscaped Lot Area 65% 65% 65% 65% 65% 20% 35% Page 1 of 2 AGENDA ITEM – 3C MEMORANDUM DATE: March 10, 2025 TO: Honorable Mayor and City Councilmembers FROM: Jessica Jagoe, City Administrator SUBJECT: State of the City Discussion Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Council should discuss and provide feedback on State of the City (SOTC) future planning. Background The City Council held the last State of the City Address on Saturday, February 10, 2024. Last October, staff received feedback from the majority of the Council to move the discussion for the 2025 State of the City Address till after the 1st of the year. The SOTC process generally begins with the Communications Coordinator attending a series of work session meetings. However, with the current vacancy in this position, I am bringing forward to at a minimum discuss a potential date and location that would allow for some preliminary planning to begin. Altogether, this is about a three to four month process from start to finish. The list below highlights the work session meetings that lead up to the SOTC: o Meeting #1: Discuss setting a date, location, marketing/outreach, topics, etc. o Meeting #2: Council members review the final topics, assign presenters, and determine the Q&A format or any other notable changes or updates to the annual event. o Meeting #3: Council members provide feedback on the first draft of the SOTC presentation. Council should discuss general timing of this event and give direction if there is interest in setting a date and location. Planning for the 2025 SOTC topics and outreach would then be brought back at a future work session for additional discussion. Page 2 of 2 Budget Impact N/A Attachment N/A Page 1 of 2 AGENDA ITEM – 3D MEMORANDUM DATE: March 10, 2025 TO: Honorable Mayor and City Councilmembers FROM: Jessica Jagoe, City Administrator SUBJECT: Code of Conduct Policy Discussion Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Council should review the draft Commissions and Committee Code of Conduct and Resolution 2016-022 for City Council Norms of Behavior and provide direction to staff on next steps. Background At the February 10th Work Session, the City Council requested staff schedule for the March Work Session the code of conduct policy discussion. There are two policies that are applicable to this discussion. The first policy would be intended for Commissions and Committee members. The second is Resolution 2016-22 which is the City Council Norms of Behavior. For the Commissions and Committee Code of Conduct, this policy development began in 2023/24 with the involvement of Councilmember Rousseau and Mayor Grant along with guidance on language from Amy Schmidt, former City Attorney, with Campbell Knutson. Additionally, one member of each Commission and Committee was given an opportunity to review and provide comments. The draft code as presented to the Council incorporates the final revisions from Ms. Schmidt. This code would apply to all Appointees and includes an aspirational statement for decorum of Commissions and Committee Members, along with examples of behavior that “meets” and “does not meet” expectations. Any report for addressing unacceptable behavior would be presented to the Personnel Committee for review. For Resolution 2016-22, the City Council should review to determine if this remains sufficient or provide staff with direction on updates for the Norms of Behavior. Also included with this memo are the January 3, 2024 special work session minutes reflecting Council discussion with LMCIT Collaboration Services regarding this topic. Page 2 of 2 Budget Impact N/A Attachment Attachment A: Draft Commissions and Committee Code of Conduct Attachment B: Resolution 2016-22 Attachment C: January 3, 2024 Special Work Session Minutes 1 Adopted _________, 2025 230744v4 City of Arden Hills Code of Conduct City Commissions and Committees Scope and Applicability: Commissions and Committee meetings and activities are expected to be an ethical, friendly, and safe environment for all residents and participants. The City Council appoints members of the Arden Hills community to serve on Commissions and Committees as provided in the Arden Hills City Code. This Code of Conduct (“Code”) outlines the expectations of people appointed to serve on a City Commission or Committee (individually, an “Appointee”, or collectively, “Appointees”), and to those City Councilmembers (including the Mayor) who interact with Appointees. This Code also outlines the processes for addressing behavior that does not meet these expectations. This Code applies to all Appointees, who serve at the pleasure of the Council as volunteers for the City, and to City Councilmembers (including the Mayor) to the extent outlined in this Code. Decorum of Commissions and Committee Members: Aspirational Statement: All Appointees will assist the presiding officer in preserving order and decorum, and in providing for the efficient operation of the meeting. Appointees will not engage in conduct that delays or interrupts the proceedings, or that hinders honest, respectful discussion and debate. Commission and Committee meetings will be conducted in a courteous manner that recognizes the validity of differing points of view and promotes the ideal of democratic discussion and debate free of insult, slander, and personal attacks and threats. To effectuate these aspirational goals, all Appointees are expected to conduct themselves at meetings in a manner consistent with the following principles. Behavior that meets the expectations of the Code includes, but is not limited to: • Be kind • Treat people with respect, courtesy, politeness, and civility • Encourage others to express their opinions and ideas • Be considerate of the time you take on a subject to allow others time to address issues • Listen • Use the ideas of others to improve decisions and outcomes • Recognize and respect differences • Come to meetings fully prepared by reading the agenda prior to the meeting • Act as a decision maker, not an advocate Behavior that does not meet the expectations of the Code includes, but is not limited to: • Speaking over, or cutting off another individual’s comments • Insulting, disparaging, or putting down people or their ideas • Violence or the threat of violence • Discriminatory jokes, language, unwelcome sexual attention • Bullying other members by displaying a pattern of belittling, demeaning, judging or patronizing language or behavior • Communicating in a tone that is not professional or appropriate for the setting, or in a manner that makes others feel unsafe • Repeated harassment of others. If someone asks you to stop, stop. Conflict of Interest: 2 Adopted _________, 2025 230744v4 As trusted advisors to the City Council, Appointees should make decisions in the interests of the City. If a Commission or Committee decision may create a favorable advantage for any Appointee, their business, or a person or entity close to the Appointee, the Appointee must disclose such a conflict of interest, and abstain from discussing and voting on the matter from which the conflict arises. Although there are many examples of conflicts of interest, it is especially important for an Appointee to abstain from any matter involving a personal financial interest in a sale, lease, or contract under consideration. Role of the Chair: The Chair is the facilitator of meetings. The Chair works with the Administrative Staff Liaison to draft meeting agendas, keeps discussions focused on the issues, and clarifies motions. The Chair seeks input and consensus around agenda items and does not let their own point of view bias or influence the Commission’s or Committee’s discussion or decision. Processes for Reporting and Addressing Unacceptable Behavior: An Appointee who observes or experiences behavior that does not meet the expectations of this Code by any of the following persons, should report such conduct to a City Councilmember on the City Council Personnel Committee (“Personnel Committee”): • Another Appointee, • The Commission or Committee Chair, • The City Council Liaison, or • Any City Councilmember (including the Mayor) who interacts with Appointee(s). The Administrative Staff Liaison may assist the Appointee in contacting a member of the Personnel Committee, if needed. Any report made will be taken up by the Personnel Committee. All good-faith reports will be taken seriously and reviewed appropriately. As part of its review, the Personnel Committee may meet with the person whose behavior has been reported to the Personnel Committee. For Reports About Appointees: The Personnel Committee will determine appropriate actions to address or mitigate the reported behavior. Such actions will be commensurate with the seriousness of the reported behavior and may include asking the Appointee to stop the behavior, or temporarily asking the Appointee to not participate at future meetings of the Commission or Committee. The Personnel Committee will convey the request(s) to the Appointee in writing. Immediate compliance by the Appointee is expected. If the Appointee does not comply with the request(s) of the Personnel Committee; or if the reported behavior resumes; or if the Personnel Committee determines at any time that any reported behavior is egregious, the Personnel Committee may present the matter to the City Council with a recommendation that the City Council consider removing the Appointee pursuant to City Code. For Reports About any City Councilmember (including the Mayor): After review by the Personnel Committee, the Personnel will present the matter to the City Council with a recommendation whether appropriate action should be taken as permitted by Minnesota Statutes or other City policy that governs elected officials. I acknowledge I have read and understand the Code of Conduct. Signature Printed Name____________________________________________________________ Date__________________ It ARZEN HILLS Approved: February 12, 2024 CITY OF ARDEN HILLS, MINNESOTA SPECIAL CITY COUNCIL WORK SESSION JANUARY 3, 2024 5:30 P.M. - ARDEN HILLS CITY HALL CALL TO ORDER/ROLL CALL Pursuant to due call and notice thereof, Mayor Grant called to order the Special City Council Work Session at 5:30 p.m. Present: Mayor David Grant, Councilmembers Brenda Holden, Emily Rousseau, Tena Monson and Tom Fabel Absent: None Also present: City Administrator Dave Perrault and League of Minnesota Cities Insurance Trust (LMCIT) Collaboration Services Manager Aimee Gourlay 1. AGENDA ITEMS A. Council Discussion with LMCIT Collaboration Services Ms. Gourlay said the goal is to give them the opportunity to discuss what they might like to do or change about the Norms of Behavior/Code of Conduct, and what the process would be for moving forward. She reviewed the items they hope to achieve; productive and efficient Council meetings, improved teamwork and agreement on process. She asked if anyone wanted to add anything else. Council also requested to talk about respect and decency. Ms. Gourlay said she would add that under meeting management. She explained the agenda and said she had brought a short Code of Conduct summary from the League of Minnesota Cities. She said the League doesn't have a standard code as they are specific to each community. Some cities have very detailed codes and Duluth has one paragraph. She expanded on the items they would be discussing. The idea was to share and hear others ideas and incorporate as many considerations as they could. The goal of a Code of Conduct is to increase their ability to have positive conflict that helps get good outcomes, and decrease the likelihood of interpersonal negative conflicts that can detract from making good decisions. Ms. Gourlay explained the Norms of Behavior 2016 could be a starting point because it already exists. Discussion was probably more important than the paper at this point. ARDEN HILLS SPECIAL CITY COUNCIL WORKSESSION - JANUARY 3, 2024 2 Council discussed issues in the past related to processes and how they have or have not come to agreement on items. Ms. Gourlay said it was about perceptions and how you're feeling about the discussion. What they seem to agree on the need to balance the meeting efficiency with making sure everyone's voice is heard and making sure the conversation is appropriate to the topic. They could talk about how to move on when all opinions have been voiced. If they feel like they're hearing the same thing and want to move on for efficiency sake, how does the Mayor know? Council discussed how side comments or underhanded remarks affect decorum. Ms. Gourlay said you're probably not listening well if there are side comments, and people will shut down if they're hearing things as attacks. That is a part of meeting decorum. It can be difficult if Councilmembers are speaking for long periods of time. So how do they balance making sure everyone has a voice? Maybe everyone says their initial thoughts and has longer to speak after that. Ms. Gourlay thought there was already a divide about how they were feeling about respect. She wondered if only some people were experiencing that or if it was a council -wide consideration. Council discussed past issues or events that they have felt contributed to feelings of disrespect or mistrust. Ms. Gourlay thought getting to a point of understanding that could be another piece of the code. And whatever code they come up with everyone has to be willing to go along with. She watched a video of a meeting but she didn't see much of this dynamic. Ms. Gourlay said there may be a need to address some of the past hurt in some way however, something that can be helpful is to look at places they've been more successful and see how they can take what is working and build on that. Council discussed teamwork and their perspectives on information sharing. Ms. Gourlay stated they're talking about Code of Conduct, but it really keeps coming back to this one issue. She asked what they needed to move forward. Council discussed better communication moving forward and past issues, also discussed looking forward not at the past when making decisions. Council discussed adding agenda items to formally report back to Council, such as, Committee/Commission updates. Ms. Gourlay said one thing they were talking about was committee reports and separating that from Council Comments. They also talked about agreeing to disagree about the past and not bring it up going forward. They talked about annual committee updates and sharing City goals. Ms. Gourlay commented that one of the things she's observing is that it's hard to get to consensus because what they're talking about keeps shifting. ARDEN HILLS SPECIAL CITY COUNCIL WORKSESSION - JANUARY 3, 2024 3 Ms. Gourlay reiterated they wanted efficient meetings, to stay on appropriate topics, everyone's voice be heard, and to avoid personal comments. Some of the items they are considering would address some of that list. Ms. Gourlay said sometimes councils have struggles with how to get things on the agenda, what's the complaint process, or the process for taking something off the consent agenda. Oftentimes it has to do with how things get heard. She wondered what's the process for assigning committees, is there an assumption that everyone gets a committee and similar types of things. Council discussed adding committee/commission reports to future agendas, and about tying it into committee/commission liaison responsibilities. Ms. Gourlay recommended they have a work session item for discussion of committee updates before it be brought for a vote at a regular meeting so there is no misunderstanding of what the policy will be. She asked if this session was a useful conversation. Council discussed not bring up past issues when making decisions affecting the present and future. Ms. Gourlay said they should move forward with discussing the issues they talked about at work sessions and if they would like her to come back she could. She could also arrange for not full group discussions. Ms. Gourlay said they remind her of good people with knowledge coming together from different places but the team can't come together. Council thanked Ms. Gourlay for her time. 2. COUNCIL/STAFF COMMENTS City Administrator Perrault said he had emailed two questions to the Council. The 2024 PMP was at 80% plan and was scheduled to be an item on the upcoming work session, did they prefer to leave it on that meeting. Also, did they want to schedule a retreat, if so he will find a date. Councilmember Rousseau would rather do a special work session on January 22 for the PMP, and she would love to have a retreat in March or April. Councilmember Monson was comfortable with having the PMP discussion on either date but she could make January 22 work. Mayor Grant explained there's what they go in at and then there's the bid. So, 80% was probably close enough. Councilmember Monson said then she was fine with it being on January 8 at 80%. She would like to have city goals at a retreat but didn't think they needed the personality piece. Mayor Grant felt a retreat was the wrong way to approach it. He thought it would be better for the group to look at some strategic topics and discuss them. He didn't know if they needed ARDEN HILLS SPECIAL CITY COUNCIL WORKSESSION — JANUARY 3, 2024 4 someone else to help them do that. He thought a facilitator would make it more touchy-feely and they would probably waste time with ice breaker type stuff. Councilmember Fabel agreed. Councilmember Monson said she found Ms. Gourlay to be valuable in these discussions. Councilmember Rousseau asked if they were going to go through the list of work session topics at the next work session and prioritize them. Mayor Grant was thinking more strategic than chickens or food trucks; he was worried more about bigger things like trails and the fire station. City Administrator Perrault said he was planning to include the list of work session priorities on the next work session so Council can let staff know what they want to bring forward in what order. Councilmember Rousseau explained that things they see on the list as a priority could be what they base a strategic plan on. Councilmember Holden asked if they were going to update the Council Tracker. City Administrator Perrault said past practice was they only removed things at Council direction. Councilmember Rousseau asked how they were moving forward with a Code of Conduct for committees. Ms. Gourlay said she had examples from other cities to send to the Mayor and Councilmember Rousseau. I\ 11 rsl IMok Mayor Grant adjourned the Special City Council Work Session at 7:09 p.m. ai Zii 4j. itimi David Grant Mayor Page 1 of 2 AGENDA ITEM – 3E MEMORANDUM DATE: March 10, 2025 TO: Honorable Mayor and City Councilmembers FROM: Jessica Jagoe, City Administrator SUBJECT: Agenda Planning Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A Council Should Consider Council should discuss its next work session agenda. Background Per Council’s adopted policy on agenda setting, please find the proposed agenda below for the upcoming meeting. April 14th Work Session • Speed Limit Old Snelling • To Be Determined • RCC/TCAAP Discussion (not time sensitive) • Agenda Planning (time sensitive) April 28th Work Session • Spine Road Design Update • To Be Determined • RCC/TCAAP Discussion (not time sensitive) • Agenda Planning (time sensitive) Attachment A is the list of topics that have yet to be discussed by Council and the 2025 ranking of priority topics as distributed to the Council at the January 13th work session. Staff will begin to work the higher priority items into upcoming work sessions sooner while putting the lower priority items to later discussions. Please note, this does not reflect all items at work sessions as Staff will have necessary items for discussion, such as, budget discussions, concept plan reviews, or Public Works projects that need timely direction. Council may want to discuss if any items Page 2 of 2 need to be added to this list for future discussion or assign a future meeting for some of these items. This would need to be done by a majority consensus of Council. Below is a running list of things Staff brings forward to work session annually, in recent years, we have shifted away from bringing some items forward unless needed, such as, the Pavement Management Update from Public Works. Note, these timelines may shift year to year. Most items discussed at work sessions are one-off items that may require multiple meetings but are usually not reoccurring. • January o Legislative priorities • February o None • March o Initial guidance on next year’s Public Works projects • April o None • May o None • June o Follow up on next year’s Public Works projects • July o Capital improvement planning • August o Operating budgets • September o Operating budget and levy discussion • October o State of the City (if planned for early following year) • November o City-wide budget and fee schedule o Follow up on next year’s Public Works projects • December o Committee and commission appointments Budget Impact N/A Attachment Attachment A: Council Priorities Attachment B: Agenda Setting Policy Ra n k To p i c f o r C o n s i d e r a t i o n Li k e l y R e s p o n s i b l e D e p a r t m e n t No t e s To p i c B a c k g r o u n d 1 Co m m i t t e e / C o m m i s s i o n G o a l S e t t i n g Ad m i n TB D To o l f o r d e v e l o p m e n t o f f u t u r e w o r k p l a n s a n d t a s k s . 3 Vo l u n t e e r R e c o g n i t i o n ( t o P e r s o n n e l f i r s t ) Ad m i n TB D Av e n u e s f o r v o l u n t e e r r e c o g n i t i o n a n d w h i c h v o l u n t e e r s . 3 Sp e e d L i m i t O l d S n e l l i n g PW TB D Di s c u s s i o n a b o u t t h e 2 5 m p h C i t y s p e e d l i m i t a n d w h e t h e r o r n o t i t s h o u l d b e i n c r e a s e d t o a h i g h e r s p e e d d u e t o t h e w a y O l d Sn e l l i n g f u n c t i o n s a s a c o m m u t e r r o u t e v s . a t y p i c a l n e i g h b o r h o o d s t r e e t . 3 Tr a i l P r i o r i t i z a t i o n ( L a k e J o B l v d v e r s u s o l d H w y 1 0 ) PW / F i n No v e m b e r 2 0 2 4 D i s c u s s i o n As s i g n i n g p r i o r i t y t o t r a i l s ( i . e . f u t u r e t r a i l c o n n e c t i o n s , f u n d i n g , a c q u i r i n g l a n d f o r t r a i l s , t r a i l m a i n t e n a n c e / n e e d s ) . 4 Cl i m a t e A c t i o n P l a n Ad m i n TB D Di s c u s s i o n o n d e v e l o p m e n t a n d e l e m e n t s o f a c l i m a t e a c t i o n p l a n . 4 Co m m i t t e e / C o m m i s s i o n M e m b e r s h i p Ad m i n TB D Yo u t h m e m b e r s v s . r e g u l a r m e m b e r ( i . e . a g e ) , r e s i d e n t v s . n o n r e s i d e n t , a p p o i n t m e n t t e r m s . 4 EV F l e e t A n a l y s i s PW TB D Ev a l u a t i o n o f f l e e t a n a l y s i s a n d p o t e n t i a l f o r p u r c h a s i n g E V C i t y v e h i c l e s . 5 En e r g y a u d i t Ad m i n TB D 5 Po r t a p o t t i e s PW TB D Di s c u s s i o n o n c o n v e r t i n g a l l r e m a i n i n g c i t y p a r k s t o i n c l u d e A D A a c c e s s i b l e b a t h r o o m s . 6 ED A M e m b e r s h i p D i s c u s s i o n CD / A d m i n Fu t u r e E D A m e e t i n g Di s c u s s i o n o n a l l m e m b e r s o f c i t y c o u n c i l o r o t h e r a p p o i n t m e n t s a s d e s c r i b e d S t a t e S t a t u t e . 7 Co m m u n i t y S u r v e y Ad m i n TB D Di s c u s s i o n o n c o n d u c t i n g a c o m m u n i t y s u r v e y - h o w i s t h e s u r v e y c o n d u c t e d , p u r p o s e / q u e s t i o n s a s k e d , l e n g t h , e t c . Ra n k To p i c f o r C o n s i d e r a t i o n Li k e l y R e s p o n s i b l e D e p a r t m e n t No t e s To p i c B a c k g r o u n d 1 Sh o r t - t e r m R e n t a l O r d i n a n c e CD / A d m i n TB D Di s c u s s i o n f o r c r e a t i n g a s h o r t - t e r m r e n t a l o r d i n a n c e . 2 Re n t a l L i c e n s i n g P r o g r a m CD / A d m i n TB D Di s c u s s i o n o n r e n t a l r e g i s t r a t i o n o r r e n t a l l i c e n s i n g p r o g r a m a n d r e n t a l l i c e n s i n g c a p . 4 Bu i l d i n g M a t e r i a l s U p d a t e / D i s c u s s i o n CD TB D Di s c u s s i o n o n e x t e r i o r b u i l d i n g m a t e r i a l s - r e q u i r e d s t a n d a r d s , s u s t a i n a b i l i t y . 7 Ke e p i n g o f D u c k s a n d R e v i e w C h i c k e n O r d i n a n c e CD / A d m i n TB D Di s c u s s i o n t o a l l o w t h e k e e p i n g o f d u c k s a n d r e v i e w o f c u r r e n t c h i c k e n s o r d i n a n c e . Ad d ed it e m s : Pr o c l a m a t i o n Po l i c y Ga r b a g e Co l l e c t i o n - O r g a n i z e d C o l l e c t i o n Co m m i t t e e / C o m m is s i o n Lia i s o n R o l e Po l i c y Co d e of Co n d u c t Do o r to Do o r G r o u p Af f i l i a t i o n / I n f o r m at i o n W i t h Ci t y Ap p r o v ed Po l i c y Di s c u s s i o n Bu y No t h i n g Da y / C l e a n Up Da y MN T W C En c r o a c h m e n t Di s c u s s i o n (2 0 2 5 ) Do o r to Do o r So l i c i t a t i o n s Ad o p t a P a r k D i s c u s s i o n 75 t h A n n i v e r s a r y Di s c u s s i o n Pl a n n i n g Po t e n t i a l O r d i n a n c e R e v i e w I t e m s : Topic for Consideration Likely Responsible Dept.Total Average 75th Anniversary Discussion Planning Admin 14 2.8 Short-term Rental Ordinance CD/Admin 13 2.6 Rental Licensing Program CD/Admin 13 2.6 Code of Conduct Admin 13 2.6 Encroachment Discussion (2025)PW 13 2.6 Trail Prioritization (Lake Jo Blvd versus old Hwy 10)PW/Fin 12 2.4 Committee/Commission Liaison Role Policy Admin 12 2.4 MNTWC CD/Admin 11 2.2 Committee/Commission Goal Setting Admin 10 2 Volunteer Recognition (to Personnel first)Admin 10 2 Committee/Commission Membership Admin 10 2 EDA Membership Discussion CD/Admin 10 2 Building Materials Update/Discussion CD 10 2 Keeping of Ducks and Review Chicken Ordinance CD/Admin 10 2 Buy Nothing Day/Clean Up Day Admin 10 2 Adopt a Park Discussion PW 10 2 Speed Limit Old Snelling PW 9 1.8 Garbage Collection (MV Presentation?)Admin 9 1.8 Climate Action Plan Admin 8 1.6 Door to Door Group Affiliation/Information With City Admin 8 1.6 Energy audit Admin 7 1.4 Porta potties PW 7 1.4 Community Survey Admin 7 1.4 Proclamation Policy Admin 7 1.4 Door to Door Solicitations Admin 7 1.4 EV Fleet Analysis PW 6 1.2 Approved Policy Discussion Admin 6 1.2 CITY OF ARDEN HILLS Agenda Setting Policy The purpose of this policy is to establish a method for agenda setting that allows for Council to review and have control over its agendas and decide as a Council how it wants items for consideration to be brought forward. For regular worksession agendas: • Prior to concluding each regularly scheduled worksession, the City Council shall review its next regularly scheduled worksession agenda and direct Staff on any changes. • Should an individual Councilmember want to raise an item for discussion at the next meeting or in the future, they would do so during this review period. The item would need at least one other Councilmember to agree to having the item considered for future discussion, and then Council, by majority, would direct to have it placed on a future agenda or not. • Staff will have flexibility to add or remove items to the worksession as needed to maintain operational efficacy. For regular City Council meeting agendas: • Agendas will be largely Staff driven based on approvals needed for normal operations. • Items coming from the City Council shall first be discussed at a worksession and can direct Staff at said worksession to bring items forward for formal approval if needed. • In rare instances, if a Councilmember brings forward an item that needs approval prior to going to a worksession, they may request the City Administrator add the item to the agenda. The City Administrator shall have the discretion to determine if the issue should be added or not, but Councilmembers will make every effort to having the item first discussed at a worksession. Special meetings and emergency meetings: • Special meetings and emergency meetings may still be called at the discretion of the Mayor or any two Councilmembers, and the members calling the meeting shall set the agenda. Page 1 of 1 AGENDA ITEM – 3F MEMORANDUM DATE: TO: FROM: March 10, 2025 Honorable Mayor and City Councilmembers Jessica Jagoe, City Administrator SUBJECT: Rice Creek Commons/TCAAP Discussion Budgeted Amount: Actual Amount: Funding Source: N/A N/A N/A For Council Consideration Council will have the opportunity to comment on any TCAAP related items they so choose. Background N/A Budget Impact N/A Attachment N/A