HomeMy WebLinkAbout03-10-25-RAPPROVAL OF AGENDA
TCAAP/Rice Creek Commons Update
Jessica Jagoe, Interim City Administrator
PUBLIC INQUIRIES/INFORMATIONAL
This is an opportunity for citizens to respectfully bring to the Council ’s attention any
items which are relevant to the City. In addressing the Council, you must first state
your name and address for the record. Comments shall be limited to three (3) minutes
or less. Written documents or other materials should be handed to the City Clerk for
distribution to the Council prior to or during the meeting. Council will generally not
respond at the same meeting where an issue is initially raised by a member of the
public but the Council may refer the issue to staff for further research and possible
report or action at a future Council meeting.
RESPONSE TO PUBLIC INQUIRIES
PUBLIC PRESENTATIONS
2026 Community Project Funding Update
Congresswoman McCollum's Office Representative
MEMO.PDF
STAFF COMMENTS
APPROVAL OF MINUTES
February 10, 2025 City Council Work Session
02 -10 -25 WS.PDF
February 10, 2025 Regular City Council
02 -10 -25 -R.PDF
February 18, 2025 Special City Council
02 -18 -25 -SR.PDF
CONSENT CALENDAR
Those items listed under the Consent Calendar are considered to be routine by the
City Council and will be enacted by one motion under a Consent Calendar format.
There will be no separate discussion of these items, unless a Councilmember so
requests, in which event, the item will be removed from the general order of business
and considered separately in its normal sequence on the agenda.
Motion To Approve Claims And Payroll
Joua Yang, Finance Director
Pang Silseth, Accounting Analyst
MEMO.PDF
Motion To Approve 2024 Budget Carryovers
Joua Yang, Finance Director
MEMO.PDF
Motion To Approve Resolution 2025 -023 Appointing Derek Hilding To The Parks,
Trails And Recreation Committee (PTRC)
Julie Hanson, Assistant the City Administrator/City Clerk
MEMO.PDF
ATTACHMENT A.PDF
Motion To Acknowledge The Application Of Ducks Unlimited North Suburban
Chapter 239 For An Exempt Permit To Conduct A Raffle With The Event Being
May 3, 2025, With No Waiting Period
Julie Hanson, Assistant to the City Administrator/City Clerk
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Motion To Authorize Recruitment Of Communications Coordinator Position
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Motion To Approve Resolution 2025 -024 For Minnesota Department Of Public
Safety Grant Funding Assistance For Lake Johanna Fire Department Project
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Motion To Approve Extension For Recording Of Final Plat –1700 Highway 96 W –
Trident Development
Elena Fransen, Senior Planner
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Amended Planned Unit Development Agreement –3776
Connelly Avenue (Event Center)
Elena Fransen, Senior Planner
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Resolution 2025 -030 Appointing Planning Commission
Members Nancy Jacobson, Jessica Birken And Donna Wiemann
Julie Hanson, Assistant to the City Administrator/City Clerk
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve 2026 PMP Street & Utility Improvements Project:
¡Resolution 2025 -025 Ordering Preparation of Feasibility
Report
¡Bolton & Menk Proposal for Professional Services -
Feasibility Report
¡Braun Intertec Proposal for Geotechnical/Pavement
Evaluation and Environmental Services
¡Nagell Appraisal & Consulting Special Benefits Appraisal
Proposal Services
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
Motion To Approve Resolution 2025 -026 Adopting The Ramsey County Multi -
Hazard Mitigation Plan
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
2025 RAMSEY COUNTY, MN HAZARD MITIGATION PLAN V2.PDF
Motion To Approve Resolution 2025 -027 Accepting Bid And Authorizing Award Of
Contract To New Look Contracting And To Authorize Proposal From Braun Intertec
For Construction Testing Services –Lift Station 5 Forcemain Rehabilitation
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
Motion To Approve Xcel Energy Consent To Improvement Agreement –Lift Station
5 Forcemain Rehabilitation
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Appointment Of Parks Lead
Jessica Jagoe, City Administrator
MEMO.PDF
Motion To Approve Appointment Of Utilities Lead
Jessica Jagoe, City Administrator
MEMO.PDF
Motion To Authorize Recruitment Of Community Development Director
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Ramsey County Cooperative Agreement For Cost Sharing And
Reclamite Treatment For Portions Of The 2025 Street Maintenance Program
Project
Lucas Miller, Assistant Public Works Director
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
PULLED CONSENT ITEMS
Those items that are pulled from the Consent Calendar will be removed from the
general order of business and considered separately in its normal sequence on the
agenda.
PUBLIC HEARINGS
2025 -2029 Capital Improvement Plan For The Issuance Of General Obligation
Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
NEW BUSINESS
Resolution 2025 -028 Approving The 2025 -2029 Capital Improvement Plan And
Approving The Issuance Of Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
Resolution 2025 -029 Accepting Adopt -A -Park Application From Shoreview/Arden
Hills Rotary
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
UNFINISHED BUSINESS
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:
David Grant
Councilmembers:
Brenda Holden
Emily Rousseau
Tena Monson
Kurt Weber
Regular City Council
Agenda
March 10, 2025
7:00 p.m.
City Hall
Address:
1245 W Highway 96
Arden Hills MN 55112
Phone:
651 -792 -7800
Website :
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting, strong residential
neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our
long -standing tradition as a desirable City in which to live, work, and play.
Members of the public may attend a
meeting in -person at City Hall or they
may view the meeting remotely on the
City ’s website using the below link.
Meetings are also broadcast on Cable
Channel 16 for those that live in Arden
Hills.
https://cityofardenhills.org/320/Watch -
City -Meetings
This meeting will be streamed live on local Cable Channel 16 and available for playback on our
website.
CALL TO ORDER
1.
2.
3.
4.
5.
5.A.
Documents:
6.
7.
7.A.
Documents:
7.B.
Documents:
7.C.
Documents:
8.
8.A.
Documents:
8.B.
Documents:
8.C.
Documents:
8.D.
Documents:
8.E.
Documents:
8.F.
Documents:
8.G.
Documents:
8.H.
Documents:
8.I.
Documents:
8.J.
Documents:
8.K.
Documents:
8.L.
Documents:
8.M.
Documents:
8.N.
Documents:
8.O.
Documents:
8.P.
Documents:
8.Q.
Documents:
9.
10.
10.A.
Documents:
11.
11.A.
Documents:
11.B.
Documents:
12.
13.
APPROVAL OF AGENDATCAAP/Rice Creek Commons UpdateJessica Jagoe, Interim City AdministratorPUBLIC INQUIRIES/INFORMATIONALThis is an opportunity for citizens to respectfully bring to the Council ’s attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting.RESPONSE TO PUBLIC INQUIRIES
PUBLIC PRESENTATIONS
2026 Community Project Funding Update
Congresswoman McCollum's Office Representative
MEMO.PDF
STAFF COMMENTS
APPROVAL OF MINUTES
February 10, 2025 City Council Work Session
02 -10 -25 WS.PDF
February 10, 2025 Regular City Council
02 -10 -25 -R.PDF
February 18, 2025 Special City Council
02 -18 -25 -SR.PDF
CONSENT CALENDAR
Those items listed under the Consent Calendar are considered to be routine by the
City Council and will be enacted by one motion under a Consent Calendar format.
There will be no separate discussion of these items, unless a Councilmember so
requests, in which event, the item will be removed from the general order of business
and considered separately in its normal sequence on the agenda.
Motion To Approve Claims And Payroll
Joua Yang, Finance Director
Pang Silseth, Accounting Analyst
MEMO.PDF
Motion To Approve 2024 Budget Carryovers
Joua Yang, Finance Director
MEMO.PDF
Motion To Approve Resolution 2025 -023 Appointing Derek Hilding To The Parks,
Trails And Recreation Committee (PTRC)
Julie Hanson, Assistant the City Administrator/City Clerk
MEMO.PDF
ATTACHMENT A.PDF
Motion To Acknowledge The Application Of Ducks Unlimited North Suburban
Chapter 239 For An Exempt Permit To Conduct A Raffle With The Event Being
May 3, 2025, With No Waiting Period
Julie Hanson, Assistant to the City Administrator/City Clerk
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Motion To Authorize Recruitment Of Communications Coordinator Position
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Motion To Approve Resolution 2025 -024 For Minnesota Department Of Public
Safety Grant Funding Assistance For Lake Johanna Fire Department Project
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Motion To Approve Extension For Recording Of Final Plat –1700 Highway 96 W –
Trident Development
Elena Fransen, Senior Planner
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Amended Planned Unit Development Agreement –3776
Connelly Avenue (Event Center)
Elena Fransen, Senior Planner
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Resolution 2025 -030 Appointing Planning Commission
Members Nancy Jacobson, Jessica Birken And Donna Wiemann
Julie Hanson, Assistant to the City Administrator/City Clerk
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve 2026 PMP Street & Utility Improvements Project:
¡Resolution 2025 -025 Ordering Preparation of Feasibility
Report
¡Bolton & Menk Proposal for Professional Services -
Feasibility Report
¡Braun Intertec Proposal for Geotechnical/Pavement
Evaluation and Environmental Services
¡Nagell Appraisal & Consulting Special Benefits Appraisal
Proposal Services
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
Motion To Approve Resolution 2025 -026 Adopting The Ramsey County Multi -
Hazard Mitigation Plan
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
2025 RAMSEY COUNTY, MN HAZARD MITIGATION PLAN V2.PDF
Motion To Approve Resolution 2025 -027 Accepting Bid And Authorizing Award Of
Contract To New Look Contracting And To Authorize Proposal From Braun Intertec
For Construction Testing Services –Lift Station 5 Forcemain Rehabilitation
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
Motion To Approve Xcel Energy Consent To Improvement Agreement –Lift Station
5 Forcemain Rehabilitation
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Appointment Of Parks Lead
Jessica Jagoe, City Administrator
MEMO.PDF
Motion To Approve Appointment Of Utilities Lead
Jessica Jagoe, City Administrator
MEMO.PDF
Motion To Authorize Recruitment Of Community Development Director
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Ramsey County Cooperative Agreement For Cost Sharing And
Reclamite Treatment For Portions Of The 2025 Street Maintenance Program
Project
Lucas Miller, Assistant Public Works Director
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
PULLED CONSENT ITEMS
Those items that are pulled from the Consent Calendar will be removed from the
general order of business and considered separately in its normal sequence on the
agenda.
PUBLIC HEARINGS
2025 -2029 Capital Improvement Plan For The Issuance Of General Obligation
Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
NEW BUSINESS
Resolution 2025 -028 Approving The 2025 -2029 Capital Improvement Plan And
Approving The Issuance Of Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
Resolution 2025 -029 Accepting Adopt -A -Park Application From Shoreview/Arden
Hills Rotary
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
UNFINISHED BUSINESS
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:David GrantCouncilmembers:Brenda HoldenEmily RousseauTena MonsonKurt Weber Regular City Council Agenda March 10, 2025 7:00 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsThis meeting will be streamed live on local Cable Channel 16 and available for playback on our website.CALL TO ORDER1.2.3.4.
5.
5.A.
Documents:
6.
7.
7.A.
Documents:
7.B.
Documents:
7.C.
Documents:
8.
8.A.
Documents:
8.B.
Documents:
8.C.
Documents:
8.D.
Documents:
8.E.
Documents:
8.F.
Documents:
8.G.
Documents:
8.H.
Documents:
8.I.
Documents:
8.J.
Documents:
8.K.
Documents:
8.L.
Documents:
8.M.
Documents:
8.N.
Documents:
8.O.
Documents:
8.P.
Documents:
8.Q.
Documents:
9.
10.
10.A.
Documents:
11.
11.A.
Documents:
11.B.
Documents:
12.
13.
APPROVAL OF AGENDATCAAP/Rice Creek Commons UpdateJessica Jagoe, Interim City AdministratorPUBLIC INQUIRIES/INFORMATIONALThis is an opportunity for citizens to respectfully bring to the Council ’s attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting.RESPONSE TO PUBLIC INQUIRIESPUBLIC PRESENTATIONS2026 Community Project Funding UpdateCongresswoman McCollum's Office RepresentativeMEMO.PDFSTAFF COMMENTSAPPROVAL OF MINUTESFebruary 10, 2025 City Council Work Session02-10 -25 WS.PDFFebruary 10, 2025 Regular City Council02-10 -25 -R.PDFFebruary 18, 2025 Special City Council02-18 -25 -SR.PDFCONSENT CALENDARThose items listed under the Consent Calendar are considered to be routine by the City Council and will be enacted by one motion under a Consent Calendar format. There will be no separate discussion of these items, unless a Councilmember so requests, in which event, the item will be removed from the general order of business and considered separately in its normal sequence on the agenda.Motion To Approve Claims And PayrollJoua Yang, Finance DirectorPang Silseth, Accounting AnalystMEMO.PDFMotion To Approve 2024 Budget Carryovers
Joua Yang, Finance Director
MEMO.PDF
Motion To Approve Resolution 2025 -023 Appointing Derek Hilding To The Parks,
Trails And Recreation Committee (PTRC)
Julie Hanson, Assistant the City Administrator/City Clerk
MEMO.PDF
ATTACHMENT A.PDF
Motion To Acknowledge The Application Of Ducks Unlimited North Suburban
Chapter 239 For An Exempt Permit To Conduct A Raffle With The Event Being
May 3, 2025, With No Waiting Period
Julie Hanson, Assistant to the City Administrator/City Clerk
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Motion To Authorize Recruitment Of Communications Coordinator Position
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Motion To Approve Resolution 2025 -024 For Minnesota Department Of Public
Safety Grant Funding Assistance For Lake Johanna Fire Department Project
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
Motion To Approve Extension For Recording Of Final Plat –1700 Highway 96 W –
Trident Development
Elena Fransen, Senior Planner
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Amended Planned Unit Development Agreement –3776
Connelly Avenue (Event Center)
Elena Fransen, Senior Planner
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Resolution 2025 -030 Appointing Planning Commission
Members Nancy Jacobson, Jessica Birken And Donna Wiemann
Julie Hanson, Assistant to the City Administrator/City Clerk
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve 2026 PMP Street & Utility Improvements Project:
¡Resolution 2025 -025 Ordering Preparation of Feasibility
Report
¡Bolton & Menk Proposal for Professional Services -
Feasibility Report
¡Braun Intertec Proposal for Geotechnical/Pavement
Evaluation and Environmental Services
¡Nagell Appraisal & Consulting Special Benefits Appraisal
Proposal Services
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
Motion To Approve Resolution 2025 -026 Adopting The Ramsey County Multi -
Hazard Mitigation Plan
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
2025 RAMSEY COUNTY, MN HAZARD MITIGATION PLAN V2.PDF
Motion To Approve Resolution 2025 -027 Accepting Bid And Authorizing Award Of
Contract To New Look Contracting And To Authorize Proposal From Braun Intertec
For Construction Testing Services –Lift Station 5 Forcemain Rehabilitation
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
Motion To Approve Xcel Energy Consent To Improvement Agreement –Lift Station
5 Forcemain Rehabilitation
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Appointment Of Parks Lead
Jessica Jagoe, City Administrator
MEMO.PDF
Motion To Approve Appointment Of Utilities Lead
Jessica Jagoe, City Administrator
MEMO.PDF
Motion To Authorize Recruitment Of Community Development Director
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Ramsey County Cooperative Agreement For Cost Sharing And
Reclamite Treatment For Portions Of The 2025 Street Maintenance Program
Project
Lucas Miller, Assistant Public Works Director
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
PULLED CONSENT ITEMS
Those items that are pulled from the Consent Calendar will be removed from the
general order of business and considered separately in its normal sequence on the
agenda.
PUBLIC HEARINGS
2025 -2029 Capital Improvement Plan For The Issuance Of General Obligation
Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
NEW BUSINESS
Resolution 2025 -028 Approving The 2025 -2029 Capital Improvement Plan And
Approving The Issuance Of Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
Resolution 2025 -029 Accepting Adopt -A -Park Application From Shoreview/Arden
Hills Rotary
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
UNFINISHED BUSINESS
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:David GrantCouncilmembers:Brenda HoldenEmily RousseauTena MonsonKurt Weber Regular City Council Agenda March 10, 2025 7:00 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsThis meeting will be streamed live on local Cable Channel 16 and available for playback on our website.CALL TO ORDER1.2.3.4.5.5.A.Documents:6.7.7.A.Documents:7.B.Documents:7.C.Documents:8.8.A.Documents:8.B.
Documents:
8.C.
Documents:
8.D.
Documents:
8.E.
Documents:
8.F.
Documents:
8.G.
Documents:
8.H.
Documents:
8.I.
Documents:
8.J.
Documents:
8.K.
Documents:
8.L.
Documents:
8.M.
Documents:
8.N.
Documents:
8.O.
Documents:
8.P.
Documents:
8.Q.
Documents:
9.
10.
10.A.
Documents:
11.
11.A.
Documents:
11.B.
Documents:
12.
13.
APPROVAL OF AGENDATCAAP/Rice Creek Commons UpdateJessica Jagoe, Interim City AdministratorPUBLIC INQUIRIES/INFORMATIONALThis is an opportunity for citizens to respectfully bring to the Council ’s attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting.RESPONSE TO PUBLIC INQUIRIESPUBLIC PRESENTATIONS2026 Community Project Funding UpdateCongresswoman McCollum's Office RepresentativeMEMO.PDFSTAFF COMMENTSAPPROVAL OF MINUTESFebruary 10, 2025 City Council Work Session02-10 -25 WS.PDFFebruary 10, 2025 Regular City Council02-10 -25 -R.PDFFebruary 18, 2025 Special City Council02-18 -25 -SR.PDFCONSENT CALENDARThose items listed under the Consent Calendar are considered to be routine by the City Council and will be enacted by one motion under a Consent Calendar format. There will be no separate discussion of these items, unless a Councilmember so requests, in which event, the item will be removed from the general order of business and considered separately in its normal sequence on the agenda.Motion To Approve Claims And PayrollJoua Yang, Finance DirectorPang Silseth, Accounting AnalystMEMO.PDFMotion To Approve 2024 Budget CarryoversJoua Yang, Finance DirectorMEMO.PDFMotion To Approve Resolution 2025 -023 Appointing Derek Hilding To The Parks, Trails And Recreation Committee (PTRC)Julie Hanson, Assistant the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFMotion To Acknowledge The Application Of Ducks Unlimited North Suburban Chapter 239 For An Exempt Permit To Conduct A Raffle With The Event Being May 3, 2025, With No Waiting PeriodJulie Hanson, Assistant to the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Authorize Recruitment Of Communications Coordinator PositionJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Approve Resolution 2025 -024 For Minnesota Department Of Public Safety Grant Funding Assistance For Lake Johanna Fire Department ProjectJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Approve Extension For Recording Of Final Plat –1700 Highway 96 W –Trident Development Elena Fransen, Senior Planner
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Amended Planned Unit Development Agreement –3776
Connelly Avenue (Event Center)
Elena Fransen, Senior Planner
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Resolution 2025 -030 Appointing Planning Commission
Members Nancy Jacobson, Jessica Birken And Donna Wiemann
Julie Hanson, Assistant to the City Administrator/City Clerk
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve 2026 PMP Street & Utility Improvements Project:
¡Resolution 2025 -025 Ordering Preparation of Feasibility
Report
¡Bolton & Menk Proposal for Professional Services -
Feasibility Report
¡Braun Intertec Proposal for Geotechnical/Pavement
Evaluation and Environmental Services
¡Nagell Appraisal & Consulting Special Benefits Appraisal
Proposal Services
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
Motion To Approve Resolution 2025 -026 Adopting The Ramsey County Multi -
Hazard Mitigation Plan
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
2025 RAMSEY COUNTY, MN HAZARD MITIGATION PLAN V2.PDF
Motion To Approve Resolution 2025 -027 Accepting Bid And Authorizing Award Of
Contract To New Look Contracting And To Authorize Proposal From Braun Intertec
For Construction Testing Services –Lift Station 5 Forcemain Rehabilitation
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
Motion To Approve Xcel Energy Consent To Improvement Agreement –Lift Station
5 Forcemain Rehabilitation
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Appointment Of Parks Lead
Jessica Jagoe, City Administrator
MEMO.PDF
Motion To Approve Appointment Of Utilities Lead
Jessica Jagoe, City Administrator
MEMO.PDF
Motion To Authorize Recruitment Of Community Development Director
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Ramsey County Cooperative Agreement For Cost Sharing And
Reclamite Treatment For Portions Of The 2025 Street Maintenance Program
Project
Lucas Miller, Assistant Public Works Director
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
PULLED CONSENT ITEMS
Those items that are pulled from the Consent Calendar will be removed from the
general order of business and considered separately in its normal sequence on the
agenda.
PUBLIC HEARINGS
2025 -2029 Capital Improvement Plan For The Issuance Of General Obligation
Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
NEW BUSINESS
Resolution 2025 -028 Approving The 2025 -2029 Capital Improvement Plan And
Approving The Issuance Of Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
Resolution 2025 -029 Accepting Adopt -A -Park Application From Shoreview/Arden
Hills Rotary
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
UNFINISHED BUSINESS
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:David GrantCouncilmembers:Brenda HoldenEmily RousseauTena MonsonKurt Weber Regular City Council Agenda March 10, 2025 7:00 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsThis meeting will be streamed live on local Cable Channel 16 and available for playback on our website.CALL TO ORDER1.2.3.4.5.5.A.Documents:6.7.7.A.Documents:7.B.Documents:7.C.Documents:8.8.A.Documents:8.B.Documents:8.C.Documents:8.D.Documents:8.E.Documents:8.F.Documents:8.G.
Documents:
8.H.
Documents:
8.I.
Documents:
8.J.
Documents:
8.K.
Documents:
8.L.
Documents:
8.M.
Documents:
8.N.
Documents:
8.O.
Documents:
8.P.
Documents:
8.Q.
Documents:
9.
10.
10.A.
Documents:
11.
11.A.
Documents:
11.B.
Documents:
12.
13.
APPROVAL OF AGENDATCAAP/Rice Creek Commons UpdateJessica Jagoe, Interim City AdministratorPUBLIC INQUIRIES/INFORMATIONALThis is an opportunity for citizens to respectfully bring to the Council ’s attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting.RESPONSE TO PUBLIC INQUIRIESPUBLIC PRESENTATIONS2026 Community Project Funding UpdateCongresswoman McCollum's Office RepresentativeMEMO.PDFSTAFF COMMENTSAPPROVAL OF MINUTESFebruary 10, 2025 City Council Work Session02-10 -25 WS.PDFFebruary 10, 2025 Regular City Council02-10 -25 -R.PDFFebruary 18, 2025 Special City Council02-18 -25 -SR.PDFCONSENT CALENDARThose items listed under the Consent Calendar are considered to be routine by the City Council and will be enacted by one motion under a Consent Calendar format. There will be no separate discussion of these items, unless a Councilmember so requests, in which event, the item will be removed from the general order of business and considered separately in its normal sequence on the agenda.Motion To Approve Claims And PayrollJoua Yang, Finance DirectorPang Silseth, Accounting AnalystMEMO.PDFMotion To Approve 2024 Budget CarryoversJoua Yang, Finance DirectorMEMO.PDFMotion To Approve Resolution 2025 -023 Appointing Derek Hilding To The Parks, Trails And Recreation Committee (PTRC)Julie Hanson, Assistant the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFMotion To Acknowledge The Application Of Ducks Unlimited North Suburban Chapter 239 For An Exempt Permit To Conduct A Raffle With The Event Being May 3, 2025, With No Waiting PeriodJulie Hanson, Assistant to the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Authorize Recruitment Of Communications Coordinator PositionJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Approve Resolution 2025 -024 For Minnesota Department Of Public Safety Grant Funding Assistance For Lake Johanna Fire Department ProjectJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Approve Extension For Recording Of Final Plat –1700 Highway 96 W –Trident Development Elena Fransen, Senior PlannerMEMO.PDFATTACHMENT A.PDFMotion To Approve Amended Planned Unit Development Agreement –3776 Connelly Avenue (Event Center)Elena Fransen, Senior PlannerMEMO.PDFATTACHMENT A.PDFMotion To Approve Resolution 2025 -030 Appointing Planning Commission Members Nancy Jacobson, Jessica Birken And Donna WiemannJulie Hanson, Assistant to the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFMotion To Approve 2026 PMP Street & Utility Improvements Project: ¡Resolution 2025 -025 Ordering Preparation of Feasibility Report ¡Bolton & Menk Proposal for Professional Services -Feasibility Report ¡Braun Intertec Proposal for Geotechnical/Pavement Evaluation and Environmental Services ¡Nagell Appraisal & Consulting Special Benefits Appraisal Proposal ServicesDavid Swearingen, Public Works Director/City EngineerMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFATTACHMENT E.PDFMotion To Approve Resolution 2025 -026 Adopting The Ramsey County Multi -Hazard Mitigation Plan
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
2025 RAMSEY COUNTY, MN HAZARD MITIGATION PLAN V2.PDF
Motion To Approve Resolution 2025 -027 Accepting Bid And Authorizing Award Of
Contract To New Look Contracting And To Authorize Proposal From Braun Intertec
For Construction Testing Services –Lift Station 5 Forcemain Rehabilitation
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
Motion To Approve Xcel Energy Consent To Improvement Agreement –Lift Station
5 Forcemain Rehabilitation
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Appointment Of Parks Lead
Jessica Jagoe, City Administrator
MEMO.PDF
Motion To Approve Appointment Of Utilities Lead
Jessica Jagoe, City Administrator
MEMO.PDF
Motion To Authorize Recruitment Of Community Development Director
Jessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Ramsey County Cooperative Agreement For Cost Sharing And
Reclamite Treatment For Portions Of The 2025 Street Maintenance Program
Project
Lucas Miller, Assistant Public Works Director
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
PULLED CONSENT ITEMS
Those items that are pulled from the Consent Calendar will be removed from the
general order of business and considered separately in its normal sequence on the
agenda.
PUBLIC HEARINGS
2025 -2029 Capital Improvement Plan For The Issuance Of General Obligation
Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
NEW BUSINESS
Resolution 2025 -028 Approving The 2025 -2029 Capital Improvement Plan And
Approving The Issuance Of Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
Resolution 2025 -029 Accepting Adopt -A -Park Application From Shoreview/Arden
Hills Rotary
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
UNFINISHED BUSINESS
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:David GrantCouncilmembers:Brenda HoldenEmily RousseauTena MonsonKurt Weber Regular City Council Agenda March 10, 2025 7:00 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsThis meeting will be streamed live on local Cable Channel 16 and available for playback on our website.CALL TO ORDER1.2.3.4.5.5.A.Documents:6.7.7.A.Documents:7.B.Documents:7.C.Documents:8.8.A.Documents:8.B.Documents:8.C.Documents:8.D.Documents:8.E.Documents:8.F.Documents:8.G.Documents:8.H.Documents:8.I.Documents:8.J.Documents:8.K.
Documents:
8.L.
Documents:
8.M.
Documents:
8.N.
Documents:
8.O.
Documents:
8.P.
Documents:
8.Q.
Documents:
9.
10.
10.A.
Documents:
11.
11.A.
Documents:
11.B.
Documents:
12.
13.
APPROVAL OF AGENDATCAAP/Rice Creek Commons UpdateJessica Jagoe, Interim City AdministratorPUBLIC INQUIRIES/INFORMATIONALThis is an opportunity for citizens to respectfully bring to the Council ’s attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting.RESPONSE TO PUBLIC INQUIRIESPUBLIC PRESENTATIONS2026 Community Project Funding UpdateCongresswoman McCollum's Office RepresentativeMEMO.PDFSTAFF COMMENTSAPPROVAL OF MINUTESFebruary 10, 2025 City Council Work Session02-10 -25 WS.PDFFebruary 10, 2025 Regular City Council02-10 -25 -R.PDFFebruary 18, 2025 Special City Council02-18 -25 -SR.PDFCONSENT CALENDARThose items listed under the Consent Calendar are considered to be routine by the City Council and will be enacted by one motion under a Consent Calendar format. There will be no separate discussion of these items, unless a Councilmember so requests, in which event, the item will be removed from the general order of business and considered separately in its normal sequence on the agenda.Motion To Approve Claims And PayrollJoua Yang, Finance DirectorPang Silseth, Accounting AnalystMEMO.PDFMotion To Approve 2024 Budget CarryoversJoua Yang, Finance DirectorMEMO.PDFMotion To Approve Resolution 2025 -023 Appointing Derek Hilding To The Parks, Trails And Recreation Committee (PTRC)Julie Hanson, Assistant the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFMotion To Acknowledge The Application Of Ducks Unlimited North Suburban Chapter 239 For An Exempt Permit To Conduct A Raffle With The Event Being May 3, 2025, With No Waiting PeriodJulie Hanson, Assistant to the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Authorize Recruitment Of Communications Coordinator PositionJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Approve Resolution 2025 -024 For Minnesota Department Of Public Safety Grant Funding Assistance For Lake Johanna Fire Department ProjectJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Approve Extension For Recording Of Final Plat –1700 Highway 96 W –Trident Development Elena Fransen, Senior PlannerMEMO.PDFATTACHMENT A.PDFMotion To Approve Amended Planned Unit Development Agreement –3776 Connelly Avenue (Event Center)Elena Fransen, Senior PlannerMEMO.PDFATTACHMENT A.PDFMotion To Approve Resolution 2025 -030 Appointing Planning Commission Members Nancy Jacobson, Jessica Birken And Donna WiemannJulie Hanson, Assistant to the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFMotion To Approve 2026 PMP Street & Utility Improvements Project: ¡Resolution 2025 -025 Ordering Preparation of Feasibility Report ¡Bolton & Menk Proposal for Professional Services -Feasibility Report ¡Braun Intertec Proposal for Geotechnical/Pavement Evaluation and Environmental Services ¡Nagell Appraisal & Consulting Special Benefits Appraisal Proposal ServicesDavid Swearingen, Public Works Director/City EngineerMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFATTACHMENT E.PDFMotion To Approve Resolution 2025 -026 Adopting The Ramsey County Multi -Hazard Mitigation Plan David Swearingen, Public Works Director/City EngineerMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDF2025 RAMSEY COUNTY, MN HAZARD MITIGATION PLAN V2.PDFMotion To Approve Resolution 2025 -027 Accepting Bid And Authorizing Award Of Contract To New Look Contracting And To Authorize Proposal From Braun Intertec For Construction Testing Services –Lift Station 5 Forcemain Rehabilitation David Swearingen, Public Works Director/City EngineerMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFMotion To Approve Xcel Energy Consent To Improvement Agreement –Lift Station 5 Forcemain Rehabilitation David Swearingen, Public Works Director/City EngineerMEMO.PDFATTACHMENT A.PDFMotion To Approve Appointment Of Parks LeadJessica Jagoe, City AdministratorMEMO.PDFMotion To Approve Appointment Of Utilities LeadJessica Jagoe, City AdministratorMEMO.PDFMotion To Authorize Recruitment Of Community Development DirectorJessica Jagoe, City Administrator
MEMO.PDF
ATTACHMENT A.PDF
Motion To Approve Ramsey County Cooperative Agreement For Cost Sharing And
Reclamite Treatment For Portions Of The 2025 Street Maintenance Program
Project
Lucas Miller, Assistant Public Works Director
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
PULLED CONSENT ITEMS
Those items that are pulled from the Consent Calendar will be removed from the
general order of business and considered separately in its normal sequence on the
agenda.
PUBLIC HEARINGS
2025 -2029 Capital Improvement Plan For The Issuance Of General Obligation
Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
NEW BUSINESS
Resolution 2025 -028 Approving The 2025 -2029 Capital Improvement Plan And
Approving The Issuance Of Capital Improvement Plan Bonds
Stacie Kvilvang, Ehlers
MEMO.PDF
ATTACHMENT A.PDF
Resolution 2025 -029 Accepting Adopt -A -Park Application From Shoreview/Arden
Hills Rotary
David Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
UNFINISHED BUSINESS
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:David GrantCouncilmembers:Brenda HoldenEmily RousseauTena MonsonKurt Weber Regular City Council Agenda March 10, 2025 7:00 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsThis meeting will be streamed live on local Cable Channel 16 and available for playback on our website.CALL TO ORDER1.2.3.4.5.5.A.Documents:6.7.7.A.Documents:7.B.Documents:7.C.Documents:8.8.A.Documents:8.B.Documents:8.C.Documents:8.D.Documents:8.E.Documents:8.F.Documents:8.G.Documents:8.H.Documents:8.I.Documents:8.J.Documents:8.K.Documents:8.L.Documents:8.M.Documents:8.N.Documents:8.O.Documents:8.P.
Documents:
8.Q.
Documents:
9.
10.
10.A.
Documents:
11.
11.A.
Documents:
11.B.
Documents:
12.
13.
APPROVAL OF AGENDATCAAP/Rice Creek Commons UpdateJessica Jagoe, Interim City AdministratorPUBLIC INQUIRIES/INFORMATIONALThis is an opportunity for citizens to respectfully bring to the Council ’s attention any items which are relevant to the City. In addressing the Council, you must first state your name and address for the record. Comments shall be limited to three (3) minutes or less. Written documents or other materials should be handed to the City Clerk for distribution to the Council prior to or during the meeting. Council will generally not respond at the same meeting where an issue is initially raised by a member of the public but the Council may refer the issue to staff for further research and possible report or action at a future Council meeting.RESPONSE TO PUBLIC INQUIRIESPUBLIC PRESENTATIONS2026 Community Project Funding UpdateCongresswoman McCollum's Office RepresentativeMEMO.PDFSTAFF COMMENTSAPPROVAL OF MINUTESFebruary 10, 2025 City Council Work Session02-10 -25 WS.PDFFebruary 10, 2025 Regular City Council02-10 -25 -R.PDFFebruary 18, 2025 Special City Council02-18 -25 -SR.PDFCONSENT CALENDARThose items listed under the Consent Calendar are considered to be routine by the City Council and will be enacted by one motion under a Consent Calendar format. There will be no separate discussion of these items, unless a Councilmember so requests, in which event, the item will be removed from the general order of business and considered separately in its normal sequence on the agenda.Motion To Approve Claims And PayrollJoua Yang, Finance DirectorPang Silseth, Accounting AnalystMEMO.PDFMotion To Approve 2024 Budget CarryoversJoua Yang, Finance DirectorMEMO.PDFMotion To Approve Resolution 2025 -023 Appointing Derek Hilding To The Parks, Trails And Recreation Committee (PTRC)Julie Hanson, Assistant the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFMotion To Acknowledge The Application Of Ducks Unlimited North Suburban Chapter 239 For An Exempt Permit To Conduct A Raffle With The Event Being May 3, 2025, With No Waiting PeriodJulie Hanson, Assistant to the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Authorize Recruitment Of Communications Coordinator PositionJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Approve Resolution 2025 -024 For Minnesota Department Of Public Safety Grant Funding Assistance For Lake Johanna Fire Department ProjectJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFMotion To Approve Extension For Recording Of Final Plat –1700 Highway 96 W –Trident Development Elena Fransen, Senior PlannerMEMO.PDFATTACHMENT A.PDFMotion To Approve Amended Planned Unit Development Agreement –3776 Connelly Avenue (Event Center)Elena Fransen, Senior PlannerMEMO.PDFATTACHMENT A.PDFMotion To Approve Resolution 2025 -030 Appointing Planning Commission Members Nancy Jacobson, Jessica Birken And Donna WiemannJulie Hanson, Assistant to the City Administrator/City ClerkMEMO.PDFATTACHMENT A.PDFMotion To Approve 2026 PMP Street & Utility Improvements Project: ¡Resolution 2025 -025 Ordering Preparation of Feasibility Report ¡Bolton & Menk Proposal for Professional Services -Feasibility Report ¡Braun Intertec Proposal for Geotechnical/Pavement Evaluation and Environmental Services ¡Nagell Appraisal & Consulting Special Benefits Appraisal Proposal ServicesDavid Swearingen, Public Works Director/City EngineerMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFATTACHMENT E.PDFMotion To Approve Resolution 2025 -026 Adopting The Ramsey County Multi -Hazard Mitigation Plan David Swearingen, Public Works Director/City EngineerMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDF2025 RAMSEY COUNTY, MN HAZARD MITIGATION PLAN V2.PDFMotion To Approve Resolution 2025 -027 Accepting Bid And Authorizing Award Of Contract To New Look Contracting And To Authorize Proposal From Braun Intertec For Construction Testing Services –Lift Station 5 Forcemain Rehabilitation David Swearingen, Public Works Director/City EngineerMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFMotion To Approve Xcel Energy Consent To Improvement Agreement –Lift Station 5 Forcemain Rehabilitation David Swearingen, Public Works Director/City EngineerMEMO.PDFATTACHMENT A.PDFMotion To Approve Appointment Of Parks LeadJessica Jagoe, City AdministratorMEMO.PDFMotion To Approve Appointment Of Utilities LeadJessica Jagoe, City AdministratorMEMO.PDFMotion To Authorize Recruitment Of Community Development DirectorJessica Jagoe, City AdministratorMEMO.PDFATTACHMENT A.PDFMotion To Approve Ramsey County Cooperative Agreement For Cost Sharing And Reclamite Treatment For Portions Of The 2025 Street Maintenance Program ProjectLucas Miller, Assistant Public Works DirectorMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFPULLED CONSENT ITEMSThose items that are pulled from the Consent Calendar will be removed from the general order of business and considered separately in its normal sequence on the agenda.PUBLIC HEARINGS2025-2029 Capital Improvement Plan For The Issuance Of General Obligation Capital Improvement Plan BondsStacie Kvilvang, EhlersMEMO.PDFATTACHMENT A.PDFNEW BUSINESSResolution 2025 -028 Approving The 2025 -2029 Capital Improvement Plan And Approving The Issuance Of Capital Improvement Plan BondsStacie Kvilvang, EhlersMEMO.PDFATTACHMENT A.PDFResolution 2025 -029 Accepting Adopt -A -Park Application From Shoreview/Arden Hills RotaryDavid Swearingen, Public Works Director/City Engineer
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
UNFINISHED BUSINESS
COUNCIL/STAFF COMMENTS
ADJOURN
Mayor:David GrantCouncilmembers:Brenda HoldenEmily RousseauTena MonsonKurt Weber Regular City Council Agenda March 10, 2025 7:00 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.orgCity VisionArden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirable City in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsThis meeting will be streamed live on local Cable Channel 16 and available for playback on our website.CALL TO ORDER1.2.3.4.5.5.A.Documents:6.7.7.A.Documents:7.B.Documents:7.C.Documents:8.8.A.Documents:8.B.Documents:8.C.Documents:8.D.Documents:8.E.Documents:8.F.Documents:8.G.Documents:8.H.Documents:8.I.Documents:8.J.Documents:8.K.Documents:8.L.Documents:8.M.Documents:8.N.Documents:8.O.Documents:8.P.Documents:8.Q.Documents:9.10.10.A.Documents:11.11.A.Documents:11.B.
Documents:
12.
13.
PUBLIC PRESENTATION - 5A
MEMORANDUM
DATE:
TO:
FROM:
March 10, 2025
Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
SUBJECT: 2026 Community Project Funding Update
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Background/Discussion
A representative from Congresswoman Betty McCollum’s office will be at the March 10, 2025
City Council meeting to provide an update regarding 2026 community project funding.
Discussion
N/A
Budget Impact
N/A
Attachment
N/A
Page 1 of 1
Approved: March 10, 2025
CITY OF ARDEN HILLS, MINNESOTA
CITY COUNCIL WORK SESSION
FEBRUARY 10, 2025
5:30 P.M. - ARDEN HILLS CITY COUNCIL CHAMBERS
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Mayor David Grant called to order the City
Council Work Session at 5:30 p.m.
Present: Mayor David Grant, Councilmembers Kurt Weber, Emily Rousseau,
Brenda Holden and Tena Monson
Absent: None
Also present: Interim City Administrator Jessica Jagoe; Public Works Director/City
Engineer David Swearingen; Finance Director Joua Yang and Assistant to the City
Administrator/City Clerk Julie Hanson
1. PUBLIC INQUIRIES/INFORMATIONAL
None.
2. RESPONSE TO PUBLIC INQUIRIES
None.
3. AGENDA ITEMS
A. Parks Master Plan Scoping Discussion
Casey Byers and Bryce Shearen from Bolton & Menk introduced themselves.
Councilmember Holden said she thinks with some of the other expensive projects happening,
we won’t be able to work on this plan for a while. She thinks this plan is five years out. She asked
if that is how she should be thinking about it.
Bryce Shearen said there is a portion of this presentation that will address that. He said he is
aware that there are some large items coming up. This planning process will help the City through
those.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 2
Bryce Shearen outlined that the presentation will walk through what a Parks Master Plan is,
project understanding and approach, engagement, budget and next steps. This is Council’s
opportunity to say what they would like to see included in this plan.
Bryce Shearen said the Park System Master Plan is a community-driven comprehensive
document that outlines the vision for a community’s parks and recreation facilities. It is a long
term vision and it is best if the documents are updated every ten years. The Master Plan will
include inventory and analysis of existing conditions. It will look at demographics and park
usage. If there are gaps in the parks, trails, open spaces or any of the park amenities, this will
identify those gaps.
Councilmember Holden asked how gaps were identified.
Bryce Shearen responded it will identify a physical gap or if there is a location that doesn’t have
a playground or open space but should. This plan will also look at local and national trends and
look for funding opportunities. The plan will include a review and recommendation on
maintenance and operation.
Bryce Shearen said the Master Plan will be a comprehensive compilation of a lot of sources of
information. Once complete this will be a guide to help make decisions. Having a Master Plan can
help manage the expectations of the community. They have worked with several other
communities were facing different types of maintenance, a wish list of amenities from residents.
This process can help align the wish list items with the priorities of the community. This can help
determine what the community needs, not just what they want. This plan will help set guidelines
for how the park system will operate for the next five to fifteen years.
Bryce Shearen shared the previous Park System Plan was completed in 2002. This will serve as a
guide for the Public Works Department and the Parks, Trails and Recreation Committee (PTRC).
The Master Plan will validate upcoming improvement projects and chart out those improvements
over the next five or ten years. This will be a good resource to help plan for the future and also
aligns different funding sources to make improvements at various parks. A lot of funding sources
and grant opportunities require a plan like this. Having a Park Master Plan shows that the City is
listening to the community and it shows a commitment to the process. There is a lot of
competition for the few Parks and Recreation grants that are available. If you can show you’ve
done the work to understand what the community needs, it will put the City in a better position to
receive funding.
Bryce Shearen said there are four major components to the process. These components are
information gathering, findings and visioning, draft recommendations and final plan. The
information gathering stage includes internal and external data collection. Internally, it will help
us understand what amenities are in place, the proximity of residents to the parks, how many
residents visit the parks and what amenities they are using. It will also determine if there are
certain parks that are visited more than others and why. External information gathered will be
those national metrics that will compare Arden Hills to regional and national standards.
Councilmember Rousseau asked what national standards are used.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 3
Bryce Shearen said NRPA metrics are used to help understand, per population, how many pickle
ball courts there should be or looking for trends in youth sports. They aren’t used as standards it’s
just seeing how Arden Hills compares to other communities.
Councilmember Rousseau asked if they will be looking at the statute that was changed for the
climate mitigation and adaption requirement, including tracking the greenhouse emissions.
Casey Byers replied that Climate Action is not built in, at this point. It could be an item that can
be explored.
Councilmember Rousseau said that will be required for the 2050 Comprehensive Plan.
Bryce Shearen said Met Council is planning on releasing guidelines on all the boxes that need to
be checked. The plan is to provide the City with a document that they can just plug into the 2050
Comprehensive Plan.
Casey Byers reiterated that if there are requirements, they will make sure they are included.
Councilmember Holden noted he keeps talking about parks. She asked where the trails come in.
Bryce Shearen said parks, trails and open space are all elements under the park system.
Councilmember Holden noted he keeps discussing how far away from a park residents are. She
hasn’t heard anything about usage of the trails. Thirty percent or less of the population of Arden
Hills’ residents are under 18. Most of the people out there using the system are adults on the
trails. She wouldn’t want that to get lost when discussing park amenities.
Casey Byers confirmed when they discuss “parks” they are talking about the entire system of
parks, trails and open spaces.
Bryce Shearen said the second phase will be findings and visioning. This is the community needs
assessment. They will take the information from the first phase and understand what the
community needs. This could include natural resources, water quality and areas of mown grass vs.
opportunities for a native vegetation restoration. They will dig in and determine what the data is
saying, to help create some themes. They will develop a shared vision for the park planning
process.
Councilmember Rousseau asked if economic opportunities were looked at in this process.
Casey Byers said they could include a market study. That isn’t typically a standard product in the
park plan process. They could look at department data. If there are revenues that are tracked on an
annual basis. They can look at how that compares to other park systems. They can identify
programming opportunities, to host community events or partnerships with other community
organizations to offer different amenities or programming in a certain area.
Bryce Shearen said just having a plan can serve as an economic engine, generating excitement
about the process.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 4
Casey Byers added having a vision for the community can help housing markets and attract
people to the community.
Bryce Shearen said the third phase is identifying draft recommendations. This is where they are
aligning community needs with what the community can support. It will then align those findings
with the resources in the Parks Department. This is where we start to chart priorities, specific
improvements and estimate a dollar value. These will have a broad range. They have done enough
playgrounds and recreation amenities where they can provide accurate cost estimates to
understand the impacts to the overall budget. This will factor in design/engineering, construction
contingencies and inflation. This becomes the backbone for the implementation plan.
Casey Byers said the fourth phase is the final plan document. This will be the City’s resource for
fielding questions regarding parks and amenities and thinking about how to manage the park
system. This will be used regularly when making decisions about park improvements.
Casey Byers said the process typically takes about nine to twelve months. They like to align the
overall schedule around community engagement, which is the driver of this entire process. During
the summer months residents are out and using the parks and attending community events. They
like to engage people while they are out utilizing the park system and thinking about recreation
activities.
Bryce Shearen said a Project Advisory Committee could help facilitate the entire process. They
envision that would be two council members and two PTRC members, two or three staff members
and the Bolton & Menk team. This committee would have regular meetings.
Councilmember Holden asked if this was the steering committee.
Bryce Shearen said it could be. This is the discussion they have had with Public Works
Director/City Engineer Swearingen. This approach would engage everybody. He reiterated it’s
important to engage residents while they are using the parks. Pop up meetings are an effective
tool for this type of engagement. They go out into the parks and talk to residents. They ask what
they like, what they don’t like and what they would like to see us do better. When commissioners
and councilmembers attend these events, it is a great opportunity for them to hear what people are
saying. He said there will be a community-wide online survey where there are images, so
residents know the amenities that are being discussed. This will be customized for what makes
sense for Arden Hills.
Bryce Shearen said this is a great opportunity to use the PTRC meetings as public engagement
opportunities. Residents can be invited to their meetings to give feedback. There are other
enhanced community input opportunities. These include an interactive online community
mapping. It’s a location-based tool. People can click right into a certain park or a portion of a trail
and leave a comment. It is a moderated feature. They also use yard signs, trail graphics, materials
in other languages and GIS asset management as a form of community engagement. Any or all of
these tools can be implemented if Council thinks they are right for Arden Hills.
Bryce Shearen outlined how this process is broken out from a budget standpoint. Project
Management and Initiation is 10%, Inventory and Analysis is 15%, Public Engagement is 15%,
Community Needs Assessment is 20%, Implementation Planning is 20% and the Final Plan is
15%.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 5
Bryce Shearen said he would be happy to answer any questions. If Council is ready to give
directions, they will prepare a proposal for Arden Hills.
Councilmember Holden asked if they collect school district information to learn what the
upcoming demographics are.
Bryce Shearen confirmed. He said they will collect school district information as well as census
data.
Councilmember Holden asked if he was talking about state or federal dollars when he is
discussing funding sources.
Casey Byers said there is a funding team at Bolton & Menk that tracks grants. They communicate
with Project Managers to align potential grant opportunities with current projects. The plan will
include a funding matrix that has a list of recommendations and a list of funding sources that may
align with those projects. They outline the application timelines. They can’t guarantee those
grants will be awarded, but they make the City aware of potential sources.
Councilmember Holden asked for confirmation that Bolton & Menk will provide a list of
funding sources. She asked if they require there be a contract with them to keep receiving those
sources.
Casey Byers said it isn’t required. They identify what the process is and give the City the
resources to find that information.
Councilmember Holden asked if they consider that we aren’t really a standalone city. There are
a lot of recreational activities in surrounding communities. She wondered if they take that into
account.
Casey Byers said as part of the proximity mapping they look at recreational facilities in
surrounding communities. As part of the survey they can look at surrounding recreational
facilities that are popular or generate a lot of business. From the list of parks in Arden Hills, and
surrounding communities, they ask people which parks they go to and why. That helps them
identify what amenities that particular park has that a resident would go there as opposed to a park
closer to their home. It’s another data point to study. They do look at surrounding communities,
specifically for communities that are land locked and surrounded by close neighbors.
Councilmember Holden wondered if they include monetary information in the resident survey.
People will say yes to anything but she wants to know if residents have the cost piece to help in
their decisions.
Casey Byers said that is done carefully with consideration from the steering committee. They try
to avoid questions that will only cause problems. They don’t want to put in a lot of wish list items
that aren’t even a possibility. Those survey options are crafted very carefully.
Councilmember Holden asked how they reach residents that aren’t using the parks when there is
a face-to-face event happening, other than the community survey.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 6
Bryce Shearen said they have a lot of tools. Their Marketing and Communications Team can
identify areas of lower income, people of color and those neighborhoods can be directly targeted
for community engagement.
Casey Byers added they have communications that can be shared with City Staff to distribute in
newsletters, direct mailings or other forms of communication.
Councilmember Rousseau asked if, in addition to surrounding community parks, they look at
other businesses that have market share such as YMCA.
Bryce Shearen said they do look at that to determine if they are adding amenities that already
exist.
Councilmember Rousseau said that she was speaking to someone in Little Canada who said they
have a Park Master Plan but they don’t have funding. She asked if they would break it down so
that the plan can be budgeted for and implemented.
Casey Byers said he works with a community in Central Iowa that has a population of 30,000.
They did the Park Plan and it included a splash pad and pickle ball facility. Those items were
tabled for a 5-10 year time frame. They set up a budget allotment every year, for the first five
years to put in accessibility improvements or replacing a portion of the playground or replacing a
roof on a shelter. This approach allowed them to chip away at the smaller items to get their park
system in better shape.
Councilmember Rousseau said she has seen some of the grants that have been awarded to New
Brighton. She thinks the decisions are going to need to be balanced based on grants. She likes the
idea of the steering committee, and she thinks the PTRC involvement will offer great insights.
The interests of the PTRC members are very diverse. Everything from natural resources to
playgrounds for their kids. Bringing in a plan so Staff and future councils know what the focus
will be for the next few years. She said the City is working with Great River Greening on a multi-
year commitment to remove buckthorn from the parks and beatifying the land with natural
species. She would like to keep those in a base layer where we are having those conversations on
how to focus on sustainability and natural resources and build out from there.
Mayor Grant said wants vs. needs has been discussed. He said the steering committee is going to
be full of people who are passionate about parks, trails and recreation. He said Mounds View just
completed a Parks Master Plan and the estimate is $20 million. There are budget limitations. He
wondered what the best way is to distinguish needs vs. wants and have it outlined in the plan. The
needs will be addressed first so we need to see that delineation in the report. Council will need to
know that.
Casey Byers said a lot of that is just a combination of those data points. Community feedback,
staff feedback, the NRPA metrics and comparisons, the proximity mapping helps with that. There
are a lot of different ways to steer that ship. That is their responsibility. They will help take all the
information and steer the City in a direction that is responsible for the community. It is a
balancing act. You want to have attractive things and you want to be competitive. People don’t
move because of the streets, they move because of the amenities. The resource and the financial
price tag is an obligation that comes with it, doesn’t mean Arden Hills has to do it alone. The plan
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 7
can help drum up support from businesses and organizations and other sources of income to help
pay for the improvements.
Mayor Grant said there are a couple of trails we want to put in. They are rather pricy. We may
have to take a look at opportunities for various grants so some of this can be funded by outside
sources. It doesn’t make sense to design a plan that can’t be implemented.
Casey Byers said they want to set the City up for success. Some communities face challenges by
not having a plan like this in place.
Mayor Grant said Mounds View was shell-shocked over the cost of their Master Plan. They
have a nice community center and a splash pad and it was still $20 million.
Councilmember Monson said she is really excited to have a Park Master Plan. One of her first
frustrations of being a councilmember was when having discussions regarding parks. She said
improving one park is just a piece of the bigger puzzle. She struggled because she wanted to have
a comprehensive view of what existed, if that was what we want and if the changes we are going
to make meet the goals. It’s exciting to have such a comprehensive view of our Parks Program.
She reiterated the need to figure out needs vs. wants. She liked the example Casey Byers shared
about raising the baseline, then you can talk about something else. It shows the ability to split that
out so Council can make those policy decisions. She wondered if TCAAP was part of the scope.
Bryce Shearan said he told Public Works Director/City Engineer Swearingen that it needs to
be addressed in the Plan. Other than that, there won’t be too much focus on TCAAP.
Councilmember Monson said it will be important to marry the two together to create that
comprehensive system. She is in favor of the PTRC participating. She is interested in seeing how
they will loop in the Lake Johannah and the Old Highway 10 trails. We hear a lot about natural
resources and she hopes this plan will help us understand how to hold those natural assets.
Councilmember Weber thought the presentation was good. He supports the PTRC being
involved. He thinks it would be ideal for the new Parks and Recreation Manager to be involved in
this process, especially the inventory process because that is a great opportunity to get to know
the parks.
Councilmember Holden shared that Public Works Director/City Engineer Swearingen has
stated that people get upset when his staff plant a certain tree or make a decision on what natural
landscaping to use. She wondered how that will be addressed in the Master Park Plan.
Public Works Director/City Engineer Swearingen said that will be addressed through asset
inventory. Those open spaces will be identified where those natural resources programs will be
functioning. That will tell us what types of natural resources can go in that space.
Councilmember Holden asked if Bolton & Menk would determine what kinds of natural
resources can go in a certain space.
Casey Byers said they won’t really get into that. A natural resource plan for a park system can get
really intense. They will cover those topics at a high level. When they do park inventories, they
are looking at physical amenities but they also note things like significant tree damage, or maybe
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 8
there are a lot of ash trees and a plan can be developed to replace those trees. They will make
recommendations to reduce mowing areas, similar to a prairie restoration.
Mayor Grant said this is Council’s opportunity to decide if Bolton & Menk should develop a
proposal and bring it back. He asked if Council would like to see a proposal. Council all agreed.
He thanked them for their presentation and said they may proceed with a proposal and bring it
back.
Councilmember Holden wondered if this should be delayed until the new Park and Recreation
Manager position is filled. She asked if this should be pushed out a month.
Councilmember Weber said the timeline is probably already closer to Quarter 2.
Interim City Administrator Jagoe said the next step is bringing back a proposal. She asked if
Council would like to see this at the March Work Session or is this an item that Public Works
Director/City Engineer Swearingen can bring forward at the March Council Meeting for
approval so staff can start with that implementation process.
Councilmember Rousseau said she would prefer it come to the regular meeting.
Mayor Grant said you don’t know what you’re going to get yet.
Councilmember Monson said it is a hard question because we don’t know what the cost is going
to be. If it’s way outside of what they are expecting, we would want to give direction to go high
level on certain things, or maybe the interactive map gets scrapped. As long as those things are
line itemed they can decide to pull certain parts based on need and expense. She thinks we may
need a work session to discuss it.
Interim City Administrator Jagoe clarified they are bringing back the proposal to do the Master
Plan within the budgeted amount. It’s not the actual plan.
Mayor Grant said if it fits within the budget they have to decide what they can do for that
amount of money.
Bryce Shearan said the plan will be within the budget unless the enhanced features are wanted.
Mayor Grant said this needs to come back in March.
Councilmember Monson agreed she would like to look at it in a work session.
Councilmember Rousseau said she is okay with it being a work session. She said we need to be
aware of those enhanced amenities. Maybe we do want to look more at the natural resource
inventory.
Mayor Grant said this will come back to the March work session.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 9
B. Water Tower Security Improvements
Public Works Director/City Engineer Swearingen said when the South Tower improvements
were being planned and designed, there was interest in adding security elements to the South
Tower. Council wanted to include some fencing improvements around the North Tower, as well.
Staff applied for the UASI grant to fund those improvements. We did not get that grant. The
timeline on that grant is to apply around March/April and then it is awarded in October. It’s a long
period of time. The improvements for the North Tower were removed from the South Tower
project so we can move forward with the needed repairs. He is seeking direction on how to move
forward, knowing it’s not budgeted.
Public Works Director/City Engineer Swearingen said we can pursue the UASI Grant to try to
cover 100% of the amount. You can request up to 100% to cover costs with no match. You aren’t
guaranteed that amount, but you can request it. It isn’t clear how much will be available this year.
They decreased it by almost 20% from 2023 to 2024. Council could direct staff to start looking at
budgeting this in for construction in 2026 or eliminate the proposed security improvements all
together.
Mayor Grant asked if the amount of overage was about $161,000.
Public Works Director/City Engineer Swearingen confirmed.
Councilmember Holden asked if that was a federal grant. She said she thinks we should apply
for the grant.
Councilmember Weber wondered if security has been an issue.
Councilmember Holden remembered there was a break-in at one of them, in the basement.
Public Works Director/City Engineer Swearingen said the security improvements are physical
barriers. There haven’t been any serious incidents. This came from a Risk and Resiliency
Assessment. These improvements were identified in that assessment.
Councilmember Weber understands the need for it but it is expensive.
Councilmember Holden said if someone breaks in and drains one of the water towers we’ll have
half the city with no water.
Councilmember Weber understands. He thinks staff should apply for the grant.
Councilmember Rousseau asked about the Risk and Resiliency Assessment, she asked what the
particular issue was that was called out.
Public Works Director/City Engineer Swearingen said they do site visits with the consultants
that create the assessment. They list what security needs each site has.
Councilmember Rousseau wondered if they identify the items as low, medium and high risk.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 10
Public Works Director/City Engineer Swearingen didn’t think they ranked them by risk, it was
a bulleted list of the items they found.
Councilmember Rousseau said that since this is not budgeted, she would like to try for the grant,
again.
Mayor Grant said the general consensus is to apply for the grant.
C. 2026 PMP Discussion
Public Works Director/City Engineer Swearingen introduced the routine PMP Projects. In
2026 the Karth Lake neighborhood is identified.
Mayor Grant asked if that would be a complete reconstruction.
Public Works Director/City Engineer Swearingen said Cummings Park Drive would be a full
depth reclamation.
Mayor Grant thought there was one that going to be fully reconstructed.
Public Works Director/City Engineer Swearingen said he included the last project that was
done on Pleasant Drive. That was a full reconstruction. Most of the streets that are being
proposed here are full depth reclamation. The curb is still in good condition and there aren’t
significant soil issues that need correction so a full reconstruction is not necessary or warranted.
Mayor Grant asked if the road project work is $1.7 million.
Public Works Director/City Engineer Swearingen confirmed. The current estimate for
roadwork is $1.72 million.
Councilmember Rousseau thought there was fiber in this neighborhood, but it doesn’t go to the
individual houses. She wondered if this is the time to work with the communications company
and discuss.
Public Works Director/City Engineer Swearingen said they will reach out to private utilities
during the feasibility stage to see what upgrades they need to make in the neighborhood.
Councilmember Rousseau noticed there are constantly energy trucks digging around in those
areas. She asked that they be looped in for that discussion to see if they can get it all done at once.
Public Works Director/City Engineer Swearingen confirmed they will be included when he
starts contacting the private utilities.
Mayor Grant asked the Council if they had any concerns with the scope of the project or
funding.
Councilmember Holden asked if Cummings Park is paid for by a business.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 11
Public Works Director/City Engineer Swearingen the assessment policy is 70% commercial.
The 70% will be split by the three commercial properties surrounding the park.
Councilmember Holden asked if there is a church wanting to build.
Interim City Administrator Jagoe said we did receive an application last year but we have not
heard back from them.
Councilmember Weber noted that Public Works Director/City Engineer Swearingen said
there were no soil issues. He asked if they are having the cores done.
Public Works Director/City Engineer Swearingen said cores were taken several years ago.
New cores and borings will be taken during this process.
Councilmember Weber asked if there is a concrete base.
Public Works Director/City Engineer Swearingen said that wasn’t found in the initial cores.
There were no borings at that time but borings will be taken during the feasibility stage.
Councilmember Rousseau asked if there was a rough estimate of what the assessment amounts
will be for residents.
Public Works Director/City Engineer Swearingen said historically they have been between
$3,500 and $7,000. They plan to take some appraisals of the property which will support the
benefit. It will be compared with the assessment policy to make sure it aligns with the appraisal.
That is something new he is proposing to do for this year. That should help support the
assessment rate. He thinks we will know that value around June.
Councilmember Monson asked about the I & I infiltration. She asked if this is a good
opportunity for homeowners to coordinate that work with this project.
Public Works Director/City Engineer Swearingen said it would be a good time for that,
however, this neighborhood is relatively new and has PVC pipe. Inspections didn’t identify
anything.
Councilmember Holden asked if they have done televising in this area.
Public Works Director/City Engineer Swearingen confirmed. It was completed last year.
Councilmember Weber asked if he has talked to Center Point.
Public Works Director/City Engineer Swearingen said they will be included in that list of
private utilities.
Councilmember Weber said that when a utility does major projects down the roadway
sometimes you can get them to fix the road.
Public Works Director/City Engineer Swearingen noted that the Karth Lake Improvement
District Board want to review the pumping operations to see if there is a way to make it more
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 12
efficient and have less of a bounce and to update the permit with the DNR to achieve a lesser
degree of bounce. They have a two-foot bounce and want to minimize the bounce to what is
reasonable with the City’s operations and recommendation from the DNR and the watershed.
Councilmember Holden asked who pays for the electric on the bounce.
Mayor Grant said the City does.
Councilmember Holden she said she remembers it being a big deal with the drought. She thinks
one is too much.
Public Works Director/City Engineer Swearingen said they want it more automated.
Mayor Grant said they want it to be more consistent.
Councilmember Holden said she understands what they are trying to do. And they’re doing it at
the City’s expense.
Public Works Director/City Engineer Swearingen said the next step is to bring forth a proposal
recommending that we stick with Bolton & Menk. They have done a great job on the past three
PMPs and they know the city well.
Councilmember Holden asked if they are giving us decent prices.
Public Works Director/City Engineer Swearingen confirmed. We compare their rates annually
and they are competitive with other firms.
Councilmember Weber asked if we get quotes from other companies. He wondered what Staff is
comparing Bolton & Menk against.
Public Works Director/City Engineer Swearingen said each consultant has a rate for each
position. When we receive the proposal, we see each task they outline. We see what position they
are using for that task and the hours they allocate towards each task. The labor rates are pretty
standard across the board between consultants. We try to negotiate and fine tune the number of
hours they allocate towards a certain task.
D. 75th Anniversary Planning
Interim City Administrator Jagoe brought forward items for the Council to consider as we start
talking about 75th anniversary planning. This will segway into 2026 budgeting. There aren’t any
dollars allocated toward this in 2025. She is seeking direction from Council on next steps for
planning the 75th anniversary celebration. She offered that a 75th anniversary sub-committee
could be created, possibly a special 75th anniversary logo, purchase promotional items.
Mayor Grant said there was a logo created for the 50th anniversary. He thought there were
paperweights and other items with the logo on it.
Councilmember Holden doesn’t remember the items but she thinks it’s more important to have a
community event than hand out junk.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 13
Mayor Grant agreed. He said he was thinking in terms of having a logo and using that to
publicize the event.
Councilmember Rousseau said she would love to see a community event. She hears from the
PTRC how residents would love a community event to bring the connection within the
community together. She said she often hears that the City is physically divided because of the
major streets that we have. She would like to see a couple Councilmembers and community
members take the lead on initially starting a community event.
Mayor Grant said that may play into Bolton & Menk’s having a community wide gathering to
communicate about parks, as well.
Councilmember Rousseau said she saw that Spring Lake Park used a portion of their Gateway
Visitors Grant for advertising for their 75th Anniversary. That may be an opportunity for us, too.
Councilmember Weber said he supports having a sub-committee for the event. He thought if the
EDC got involved, maybe local businesses would sponsor. He knows there is a resident who has a
Facebook page that has old photos of Arden Hills. He also thought having a contest for creating a
logo, would be an option.
Councilmember Holden wants this to be as simple as possible because staff is so booked. She
was thinking about a movie in the park and some ice cream. We don’t have enough Staff for
planning, we don’t have a lot of funding but we do have an Arden Hills historian. He has put
together a book. He has offered to come in and show us the items. She thinks this should be sweet
and simple. What if the weather is not good?
Mayor Grant said maybe it could be tied in with the Penny Carnival. Council is in agreement
that we want to do something. We aren’t going to plan it today but he agrees it needs to be kept
relatively simple.
Councilmember Monson would recommend having a committee. She said it can be very
structured. It can be a narrow goaled sub-committee. There are some cool ideas and the City has a
lot of community event planners that would probably be happy to participate. We aren’t in a
hurry. It would be great to have public input.
Councilmember Holden thinks the sub-committee should be people that are in the community
and know the history. They can talk to PTRC and EDC. This is a unique thing for the community
as a whole.
Councilmember Weber agrees, to an extent that this shouldn’t be assigned directly to the
existing committees. But it should be open for committee members to be a part of the sub-
committee, just as equally as someone who isn’t currently serving on a committee or commission.
Councilmember Rousseau was thinking about a combination of PTRC, EDC, Council and
residents. But keep it small. Just a couple from each group.
Councilmember Monson is open to that approach but is also open to completely opening it to
the public.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 14
Councilmember Holden said it should be opened up to the people who are interested in the
community and have deep roots here.
Councilmember Rousseau asked what she meant by deep roots.
Councilmember Holden said people that used to own land along Lake Johannah, the Perry’s.
There are people who have lived here since 1940, before it was changed over. Dan Ashbach has
owned that piece of property. His grandpa owned it back in the 30s. There is a historian here
who’s been here for 50 years.
Mayor Grant said there are people living here that owned land on TCAAP.
Councilmember Holden said these are people that really have an interest in stuff like this. Not
everyone has just moved in, in the last ten years.
Councilmember Weber said a lot of the committee members are very long-time residents who
are deeply involved in the City. However, this should be open to others. We want to keep it small.
Councilmember Holden said she never said to keep it small. She said Councilmember Weber
wants the other committees to do it and open it up to other people.
Councilmember Weber said he already stated it maybe shouldn’t be assigned to any specific
committee, but that members of the committees could join as they are residents. He said
especially the historians who live here.
Councilmember Holden heard him say that but Councilmember Rousseau said something
different.
Councilmember Rousseau said she would rather see a steering committee with fewer members.
She thinks a larger committee would be less productive.
Councilmember Monson thinks this is getting heated for no reason. She thinks it should be
opened up to the public. The people who want to participate can. She would like to keep it small
because she agrees the production of a larger group is tough. She thinks committee members can
be invited to be involved. Extending an invite to the Perrys and some other long term residents,
would be fine.
Mayor Grant summarized that there seems to be a consensus to open it up to the public,
including current committee members and to keep it small.
Councilmember Holden wanted to know what “small” is. She wonders, what’s too big.
Mayor Grant thinks if it’s more than ten, it’s too big.
Discussion ensued about how many residents should serve on the committee. Council agreed it
should remain less than ten.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 15
Interim City Administrator Jagoe said she will put together the information she gathered and
share the information with Council before we do any advertising to recruit participants for the
sub-committee.
E. Agenda Planning
Mayor Grant noted that the top of the list has short term rental ordinance and rental licensing
program. He asked if those should be at the top. He said those are the ones that were voted to be
at the top and is probably enough for staff to dig into.
Interim City Administrator Jagoe isn’t sure if it can be ready in a month but Staff can start to
put together the information. Those will also align with the work currently being done on the
Zoning Ordinance review. Staff will survey other communities and can start to share some of that
information.
Mayor Grant thought the encroachment discussion could probably be ready to bring back in a
month. He is looking for items that can be ready in a month.
Councilmember Weber thinks the code of conduct is important.
Councilmember Monson said some of that work has already been done. That may be a good
March topic. She reminded that Bolton & Menk will be back in March with the parks proposal.
Councilmember Rousseau said there is a Code of Conduct for City Council and one for the
committees. The commissions have reviewed this it has just been sitting for about a year now.
Councilmember Monson said they are two separate Codes of Conduct, but should be similar, in
theory.
Mayor Grant summarized that in March Staff will bring forward the Code of Conduct. Staff will
do what they can on rental licensing and short-term rental ordinance. That is a big topic. Bolton &
Menk will return with the park proposal.
Councilmember Rousseau asked if Council will meet again in February.
Mayor Grant said there will probably be a special meeting in February for the fire department.
Interim City Administrator Jagoe said that will be a follow up item to have Council weigh in
regarding the Joint Powers Agreement (JPA). There are some proposed amendments that are
more consistent with how the financing and the operations of the board and what the JPA will be
doing for the construction. It isn’t changing any processes but refining it to be consistent with the
bylaws and how the Headquarters Board is operating today. Now that the bids have been
received, the Headquarters Board is going to be having a special meeting on February 19th. They
are looking for City Councils to weigh in and approve the JPA amendment. We received those
today and Staff didn’t have enough time to get that item assembled in time for tonight’s meeting.
Councilmember Holden wasn’t sure what we need before the 19th.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 16
Interim City Administrator Jagoe said ideally, the request of the Lake Johanna Fire Department
is that the three Cities have reviewed the two resolutions as well as the amendments. She isn’t
sure what will happen if Arden Hills didn’t take action by February 19th but that is their request.
Mayor Grant said that means we might have a Special Meeting.
Interim City Administrator Jagoe will circulate an email to the Council with some background
information.
Mayor Grant said his understanding is the changes are contextual and don’t change the
organizational structure.
Interim City Administrator Jagoe confirmed. It won’t change the cost share or the formula.
Mayor Grant said it shouldn’t be anything controversial.
Interim City Administrator Jagoe confirmed. It has been mentioned that these bylaw changes
are coming.
F. Rice Creek Commons/TCAAP Discussion
This item was not discussed.
4. COUNCIL COMMENTS AND STAFF UPDATES
Councilmember Rousseau said the Rotary Club has submitted an application to adopt Floral
Park. She wondered what Council would like to see for next steps. She would love to connect
with the Rotary at the end of the summer to determine if we are ready to open this up to everyone
next year.
Mayor Grant said if groups are adopting the parks, the Council should weigh in and be really
official.
Councilmember Rousseau asked if there should be a resolution adopting this.
Councilmember Holden said we need to see what the scope is of the adoption. She wondered
how much of this will add continual work to Public Works.
Mayor Grant said there should be a standard to-do list, when a group wants to adopt a park.
Councilmember Rousseau said that’s why we’re limiting it to one right now. The Park Manager
position can come in and take over that program.
ARDEN HILLS CITY COUNCIL WORK SESSION – FEBRUARY 10, 2025 17
ADJOURN
Mayor Grant adjourned the City Council Work Session at 6:55 p.m.
__________________________ __________________________
Jennifer Estling David Grant
Deputy Clerk Mayor
Approved: March 10, 2025
CITY OF ARDEN HILLS, MINNESOTA
REGULAR CITY COUNCIL MEETING
FEBRUARY 10, 2025
7:00 P.M. - ARDEN HILLS CITY COUNCIL CHAMBERS
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Mayor David Grant called to order the regular City
Council meeting at 7:00 p.m.
Present: Mayor David Grant, Councilmembers Brenda Holden, Tena Monson,
Emily Rousseau and Kurt Weber
Absent: None
Also present: City Administrator Jessica Jagoe; Public Works Director/City Engineer
David Swearingen; Finance Director Joua Yang; and Assistant to the City
Administrator/City Clerk Julie Hanson
PLEDGE OF ALLEGIANCE
1. APPROVAL OF AGENDA
Councilmember Holden requested Item 8R be pulled from the Consent Agenda for discussion as
Item 9A.
Councilmember Holden requested Item 8F be pulled from the Consent Agenda for discussion as
Item 9B.
MOTION: Councilmember Monson moved and Councilmember Weber seconded a
motion to approve the meeting agenda as amended. The motion carried (5-0).
2. TCAAP/RICE CREEK COMMONS UPDATE
City Administrator Jagoe stated the Joint Development Authority met on January 21st and
February 3rd. At the January 21st meeting, JDA staff presented the draft Sustainability Design
Guidelines for approval. This step followed the JDA’s approval of a Clean Energy Policy of
“Rice Creek Commons seeks to be an all-electric, carbon-free community.” JDA staff worked
with LHB on these guidelines following the Clean Energy Analysis Report that was presented to
the JDA in November. These standards include standards for LEED certification, building energy
efficiency, all-electric buildings, photovoltaic (PV) system installation, electric vehicle charging
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 2
infrastructure, and reporting. JDA staff is also working with LHB and the JDA attorney to
describe implementation and compliance, including the waiver approval process. Direction was
given at this meeting to City and County staff to determine next steps, if any, for memorialization
of standards.
Also at the January meeting, Ryan Companies presented a concept plan for Outlot A. The project
would be a combination of office and manufacturing use for Micro Control Company located in
Friday. They are a local advanced technology company specializing in technology
manufacturing, research and development, and advanced technology testing. It is estimated they
would provide over 240 high-quality jobs and the company is anticipating more than a 20%
growth in the next five years. The proposed structure would be an approximately 157,725 square
foot building with an area on the east side of the building for a 13,100 square foot expansion area.
Ryan Companies is working through their final design plan to determine next steps whether that
would be for review by the JDA compliant with TRC or seek City review of TRC amendments
prior to JDA review.
At the February 3rd meeting, JDA staff presented the draft Annual Report. Information will be
added on budget/financials from Ramsey County staff along with comments for ongoing 2025
items to be completed. A final report will be distributed to the City and County upon
completion.
Commissioners discussed the current agreements in place for Outlot A with Ryan Companies and
California Parcel with Alatus. JDA staff reviewed that the Preliminary Development Agreement
with Alatus and initial discussion occurred on language in the PDA regarding substantial
agreement on the terms of the Development Agreement and the agreement being effective
through June 30th, 2025. County staff shared that negotiations are still ongoing on the terms of a
PSA, but any agreement would be contingent on a Development Agreement. Additionally, the
JDA Attorney indicated that the PDA terminates if not satisfied with a Development Agreement
or extended. The JDA has requested that staff provide an update on the term sheet at the March
meeting to assess and decide on progress of substantial agreement of DA terms. The next JDA
meeting will be Monday, March 17th.
Councilmember Holden asked if the City was paying for the Ehlers reports or was this being
paid for by the JDA.
City Administrator Jagoe explained the previous Ehlers reports have been paid for by the City.
Councilmember Monson clarified the agreement with Alatus has a deadline of June 30, 2025,
which was fast approaching. She indicated the JDA discussed the timeline and how to go about
moving towards an agreement.
Councilmember Holden explained the agreement with the County only addressed the sale of the
property and does not address affordability or how deep affordability would be. She questioned if
the development agreement would address housing affordability.
City Administrator Jagoe reported the purchase and sale agreement will include a clause that it
was contingent of the development agreement. She stated the development agreement would be
through the JDA separate from the PSA, which would be with the County.
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 3
Councilmember Holden indicated the June 30th timeline was important in order to reach a PSA
as well as a negotiated development agreement speaking to all of the terms on the term sheet.
Mayor Grant commented June 30th was described as the deadline but could be extended by the
County and Alatus.
City Administrator Jagoe reported the parties able to extend the deadline were Alatus and the
JDA.
3. PUBLIC INQUIRIES/INFORMATIONAL
Linda Swanson, 1124 Ingerson Road, questioned who she was more disappointed in, Rafael
Ortego after writing the January 2025 article about Rice Creek Commons or the JDA members.
She believed it was the later. She stated she understood TCAAP will be developed, but how it was
being developed was a concern. She commented TCAAP was being developed for the State of
Minnesota, Ramsey County and finally for the City of Arden Hills and its residents. She was of
the opinion the City was shouldering a lot of the financial burden for this project. She indicated
she was taken aback by Mr. Ortega’s comments that stated “we are a fully developed County and
the only way to expand the tax base was to clear up the brownfields. We will expand the County
tax base and would then reduce every Ramsey County taxpayers burden”. She indicated the Rice
Creek Commons site remains one of the premier opportunities in Minnesota and among urbanized
counties like Ramsey County. She asked if the JDA members believed this project would reduce
the taxpayer burden and requested these members provide her with specific examples of when
this has occurred. She indicated there was nothing in the article about what this project will cost
the City or its residents. She anticipated Arden Hills residents would be paying additional taxes
for increased water usage, sewage treatment, road maintenance, police and fire protection,
garbage services and other services, as well as an increase in traffic. She stated when it comes to
gratitude, Mr. Ortega was only thankful to the City of Arden Hills colleagues that were serving on
the JDA. She was of the opinion, JDA individuals have failed to tell it like it is to Mr. Ortega
regarding what will have to be sacrificed for the TCAAP development.
4. RESPONSE TO PUBLIC INQUIRIES
None.
5. PUBLIC PRESENTATIONS
A. Twin Cities Chamber of Commerce Updates
John Connelly, Twin Cities Chamber of Commerce President, thanked the Council for their time
and explained the vision of the Chamber which was to promote business, develop leaders and
connect communities. He commented on the individuals that serve on the Chamber board and
discussed how they serve the community. He stated the Chamber has seen incremental growth
over the past two years. He invited the Council to attend the next Business Council meeting which
would be held on March 19. He commented on the new initiatives that have been pursued by the
Chamber, which included Green to Go and a manufacturing cohort. He further described the
marketing initiatives that were being pursued by the Chamber at a local level and thanked the City
of Arden Hills for their continued support and partnership.
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 4
Councilmember Holden thanked the Chamber for participating in the Lexington Avenue events.
Councilmember Monson reported the Council discussed the City’s 75th anniversary event that
would occur next year during the work session. She asked that the Chamber participate in this
event.
Mayor Grant thanked the Chamber for sponsoring the Welcome Back marketing campaign for
the businesses along Lexington Avenue. He thanked Mr. Connelly for serving as one of the City’s
representatives at the Twin Cities Gateway Bureau.
Councilmember Rousseau thanked Mr. Connelly for all that he does on behalf of the City of
Arden Hills. She commented on the adopt a park program that was being pursued by the City and
stated she hoped the City could partner with local businesses on this new program.
6. STAFF COMMENTS
None.
7. APPROVAL OF MINUTES
A. January 13, 2025, City Council Work Session
B. January 13, 2025, Regular City Council
MOTION: Councilmember Holden moved and Councilmember Monson seconded a
motion to approve the January 13, 2025, City Council Work Session minutes
as presented and the January 13, 2025, Regular City Council meeting minutes
as amended. The motion carried (5-0).
8. CONSENT CALENDAR
A. Motion to Approve Consent Agenda Item - Claims and Payroll
B. Motion to Approve Residential Recycling Services Contract with Walters
Recycling and Refuse, Inc.
C. Motion to Approve City Newsletter Policy
D. Motion to Approve 2025-2027 Collective Bargaining Agreement Amendment –
IUOE 49
E. Motion to Authorize Recruitment of Parks and Recreation Manager Position
F. Motion to Authorize Recruitment of Public Works Parks Lead and Utilities Lead
Positions
G. Motion to Approve Resolution 2025-011 Supporting Lake Johanna Fire
Department New Headquarters Station Construction and Funding and Resolution
2025-021 for MN Department of Public Safety Grant Funding Assistance for Lake
Johanna Fire Department
H. Motion to Approve Resolution 2025-012 Accepting Bid and Awarding Contract to
BRZ Coatings, Inc. – South Tower Improvements Project
I. Motion to Approve Payment to Ramsey County for Lexington Avenue
Reconstruction Project City Right-of-Way Costs
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 5
J. Motion to Approve Resolution 2025-013 Approving Plans and Specifications and
Ordering Solicitation of Quotes – 2025 Park Improvement Project (Freeway Park
and Arden Oaks Park)
K. Motion to Approve Resolution 2025-014 Approving Plans and Specifications and
Ordering Advertisement for Bids – Lift Station No. 5 Rehabilitation Project
L. Motion to Approve 2025 Purchase of Bobcat Toolcat
M. Motion to Approve Order of 2026 Tanker Truck Replacement
N. Motion to Approve 2025 Purchase of Two Toro Zero Turn Mowers
O. Motion to Accept City Administrator Contract
P. Motion to Approve Resolution 2025-015 Appointing Dan Dietz as Chair and Liz
Johnson as Vice Chair to the PTRC
Q. Motion to Accept Resignation of Rob Williams from the Economic Development
Commission (EDC)
R. Motion to Approve Resolution 2025-016 Approving Planned Unit Development
(PUD) Amendment and Site Plan Review – 4200 Round Lake Road - Planning
Case 24-020
S. Motion to Approve Professional Services Agreement Extension with Rainbow
Tree Care
T. Motion to Approve Resolution 2025-017 Accepting Bid and Awarding Contract to
Hydro-Klean – 2025 CIPP Lining Project
U. Motion to Approve Resolution 2025-018 Providing for the Issuance and Sale of
General Obligation Bonds
V. Motion to Approve Hiring Permit Technician/Office Support Specialist
W. Motion to Approve Resolution 2025-019 Appointing Kyle Sorenson to the
Economic Development Commission (EDC)
X. Motion to Approve Resolution 2025-020 Renaming the Section of Old Highway 8
Between County Road I West and County Road H as Rice Creek Parkway
MOTION: Councilmember Holden moved and Councilmember Monson seconded a
motion to approve the Consent Calendar as amended and to authorize
execution of all necessary documents contained therein. The motion carried
(5-0).
9. PULLED CONSENT ITEMS
A. Motion to Approve Resolution 2025-016 Approving Planned Unit
Development (PUD) Amendment and Site Plan Review – 4200 Round Lake
Road - Planning Case 24-020
Councilmember Holden stated this was the first time the Council has reviewed this item. She
explained because additional signage was being given, she would like to see the City given a
small easement on this property to allow for the installation of a City of Arden Hills sign. She
indicated this could be a very small easement for a gateway sign. She suggested action on this
item be tabled to see if the City could acquire an easement on this property.
Councilmember Rousseau indicated she supported this creative idea.
Councilmember Monson commented she supported this idea as well with staff being directed to
provide direction on where a good place would be for a future gateway sign.
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 6
Mayor Grant stated he believed the proposed sign easement was a good idea, noting this location
would be visible from 694 and was a prominent corner in Arden Hills. He indicated the applicant
was requesting a PUD amendment and he was of the opinion the request for a sign easement
would be appropriate.
Councilmember Weber reported he believed this was a clever idea.
City Administrator Jagoe stated if the Council moved this item forward by tabling, staff could
work with the property owner on a potential easement. She commented there may be another
option to incorporate an Arden Hills logo onto a future combined monument sign for the
businesses.
Mayor Grant asked if this should be made a condition for approval.
City Administrator Jagoe suggested the Council add a condition that would require the property
owner’s consent to grant an easement or work with the City to incorporate future signage on any
freestanding signage. However, if the property owner denied this request, the City would move
the item forward and permit the signage. She commented if the Council wanted to know the
property owners answer, she suggested the item be tabled with direction to staff that information
be gathered from the applicant and that the item return to the City Council on March 10.
Rick Ferarro, Spectrum Signs President, explained he was representing Altus Properties, CPC
and Delkor. He reported he understood the request the Council was making, but he asked that the
PUD amendment move forward with an increased sign size from 4.5 square feet for the code
allowed 6 square feet. He explained CPC and Delkor were having trouble with deliveries and
logistics right now. He reported the new signs would assist with guiding or directing traffic in a
safe and efficient manner. He discussed how the proposed sign easement was an entirely different
conversation that could be held with the ownership group. He recommended this be treated as a
side conversation than the requested way finding signage.
Councilmember Holden indicated this was the first time the City Council had reviewed this
request and she believed now was the time for the Council to request an easement because this
was an important property in Arden Hills. She supported this item being tabled for one month in
order to allow for further conversations to be held regarding the proposed easement.
Councilmember Weber questioned when this item was reviewed by the Planning Commission.
City Administrator Jagoe reported this item was reviewed by the Planning Commission on
January 8.
Councilmember Weber commented he loved the idea of a monument sign for the City on this
property, but indicated he did not support strong arming the applicant in order to achieve this.
Councilmember Holden explained she was not strong arming the applicant over this but rather
was requesting action on this item be postponed for 30 days in order to have an easement request
considered.
Councilmember Monson requested further information on how the Council could move this
item forward with a condition for approval regarding the sign easement.
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 7
City Administrator Jagoe stated the condition could be worded in such a manner that if the
property owner did not consent, it satisfies the condition so staff could move forward and issue
permits.
Councilmember Monson indicated she did not support holding this item up, but she also wanted
to see if there was a way forward for the sign easement.
Mayor Grant supported the Council having a conversation with the property owner in order to
receive the easement. He stated the applicant was asking for signage and the City, as part of the
PUD amendment was asking for a sign easement.
Mr. Ferarro commented he was not requesting branded signage but rather was requesting
wayfinding signage.
Mayor Grant commented he would be in favor of tabling action on this item, or having approval
being contingent upon meeting a condition to receive an easement.
Councilmember Holden suggested this item be tabled to the February 19 Special City Council
meeting.
Mayor Grant supported this recommendation.
Councilmember Weber inquired if the City would deny the sign request if the applicant were to
not allow for the sign easement.
Councilmember Holden explained she could not speculate how people would vote in the future.
Councilmember Monson indicated she would not deny the request for lack of an easement.
Councilmember Weber stated he did not believe this was an unreasonable discussion to have.
He commented his personal opinion was that he would not hold this item up if the easement were
not granted.
Councilmember Rousseau inquired if the request were approved, would the applicant speak with
the owner in good faith about the sign easement.
Mr. Ferarro stated he could do this.
Councilmember Monson indicated if the applicant were to say no at this time, there may be an
opportunity for a partnership in the future. She reviewed a proposed condition that could be made
a part of the motion to read: The applicant shall work with City staff to identify a location for an
easement in favor of the City for the purpose of a gateway sign, or combined signs. She
commented she was trying to find a way forward in order to not hold this item up.
Mayor Grant reported if a condition were added, the condition would have to be met before the
requested CPC/Delkor signs could go up.
City Administrator Jagoe reported this was the case. She explained if the applicant were to say
they do not want to grant the City an easement, would this satisfy the condition because they had
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 8
worked with City staff. Or would an easement have to be defined in order for the signs to be
installed. She indicated she would want this clarification from the City Council.
Councilmember Weber stated he was satisfied with an assurance the representative would speak
with the property owner regarding the sign easement. He reiterated that this item has been
available for Council’s review for the past month and he did not believe it was reasonable to hold
it up.
Councilmember Holden commented this item may have been available for one month, but she
did not believe the Councilmembers read every single item that was presented to the PTRC, the
EDC or Planning Commission. She apologized that she had not taken action sooner, but she
believed now was the time to ask for an easement. She supported staff speaking with the property
owner and not the sign representative.
Mayor Grant indicated the Councilmember Holden could not meet privately with the City
Council to discuss this matter prior to this meeting because this would violate the open meeting
law. He reported this was the Council’s first opportunity to discuss this request.
Councilmember Weber stated he understood this was not an open meeting law item. He
commented the matter at hand was reaching out to applicant in a reasonable amount of time
regarding the easement request.
Mayor Grant explained he did not have a problem with Councilmember Monson’s proposed
amendment, except for the work with reference. He suggested the language be changed to obtain
an easement. He reported PUD amendments allow for give and take, which was why large
developments like this request flexibility with the understanding the City also has the opportunity
to ask for something in exchange.
Councilmember Monson stated she was of the opinion it would be too difficult to draft a
condition at this meeting and noted she did not support denying the request if the applicant
opposed the easement. She recommended the item be moved forward and that direction be given
to staff to reach out to the owner to see if there was a separate pathway forward for the sign
easement.
Mayor Grant indicated he would be in favor of tabling action on this item in order to allow staff
to have discussions with the property owner.
Mr. Ferarro stated he believed his request was very elementary, noting three signs were
approved as part of the PUD. He indicated he was not asking for any more than three signs, but
rather he was asking for what code allows for logistic purposes.
Mayor Grant reported the Council has not had a lot of discussion regarding the requested signs
because the Council did not object to the signs.
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 9
MOTION: Mayor Grant moved and Councilmember Holden seconded a motion to table
action on the Planned Unit Development (PUD) Amendment and Site Plan
Review for the property at 4200 Round Lake Road directing staff to work
with the applicant regarding the exploration of a sign easement for the City of
Arden Hills. A roll call vote was taken. The motion failed 2-3
(Councilmembers Monson, Rousseau and Weber opposed).
MOTION: Councilmember Weber moved and Councilmember Rousseau seconded a
motion to Approve Resolution 2025-016 Approving Planned Unit
Development (PUD) Amendment and Site Plan Review – 4200 Round Lake
Road - Planning Case 24-020 with conditions.
Councilmember Holden stated she had supported the condition as proposed by Councilmember
Monson. She recommended a condition be added that read: The applicant will review case with
property owner and request property owner to work with the City for a small easement on the
694/35W side of the property for an Arden Hills sign or that a joint monument sign be considered.
AMENDMENT: Councilmember Holden moved and Councilmember Weber seconded a
motion to recommend the addition of Condition 7 to read: The
Applicant will meet with the Property Owner to discuss granting an
easement to the City of Arden Hills for gateway signage to be installed
along 694-35W or consider adding City of Arden Hills to any monument
sign planned for the future and provide written documentation. .
Councilmember Holden stated she has learned over the years that if a condition was not put in
place requiring certain action, there is no guarantee the action will be taken.
Mayor Grant reported the former City Attorney made this very clear for the City Council on
many, many occasions.
Councilmember Monson stated Councilmember Weber seconded the motion and she would be
supporting the amendment.
The amendment carried (5-0).
Councilmember Holden recommended a specific date be placed in her condition to ensure action
was taken on this item. She suggested the date be March 30, 2025.
AMENDMENT: Councilmember Holden moved and Mayor Grant seconded a motion
to recommend the addition of Condition 7 to read: The Applicant will
meet with the Property Owner to discuss granting an easement to the City
of Arden Hills for gateway signage to be installed along 694-35W or
consider adding City of Arden Hills to any monument sign planned for the
future and provide written documentation by March 30, 2025. .
The amendment carried (5-0).
Councilmember Monson thanked Councilmember Holden for coming up with a creative
solution and for moving this item forward.
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 10
Mayor Grant reported there were a number of locations the City wanted to put gateway signs
and explained this was an important corner that delineates Arden Hills.
Councilmember Holden explained she believed she had the right to discuss a matter even if it
has been around for two years, one year or one month.
The amended motion carried (5-0).
B. Motion to Authorize Recruitment of Public Works Parks Lead and Utilities
Lead Positions
City Administrator Jagoe stated as part of the 2025 budget discussions, the City Council
approved Public Works staffing changes which included the hiring of Lead positions within the
Department. These department organizational changes were originally presented and discussed
with the City Council at the August 19, 2024 work session. Primary duties of the Parks Lead and
Utilities Lead:
• Lead the day-to-day activities
• Plan work within their division from week-to-week
• Implement division tasks outlined in the Public Works Maintenance Plan
• Quality control
• Assists in the preparation of the Public Works Maintenance Plan
City Administrator Jagoe explained the Lead positions will allow for more detailed
maintenance/repair information to be prepared for each division to put Public Works in a
“proactive” maintenance state and allows them to get away from being “reactive”. All
Maintenance Workers and both Leads are still required to be cross-trained and supplement labor
needs in all divisions. The Memorandum of Understanding and pay scale for the Lead positions
were approved as part of the 2025-2027 Collective Bargaining Agreement Amendment – IUOE
49 under agenda item 8D. As previously mentioned, these Lead positions will not add to the
current staffing numbers within the Public Works Department. Rather these positions will be
internally posted for recruitment to the current Public Works Maintenance employees and
essentially transition two Maintenance Worker positions to two Lead Maintenance Workers.
Anticipated process:
-Council approves authorization to begin the internal recruitment process
-Staff posts for the positions internally
-Staff reviews applications and selects interview candidates and selects a finalist
-Staff will bring forward a finalist for official Council approval
City Administrator Jagoe reported Councilmembers have previously expressed an interest in
being part of the interview panel for certain positions at City Hall; currently no Councilmembers
are slated to be on the interview panel for this position. Should Council want to designate
Councilmembers to attend, they should do so with this authorization. The Lead positions were
included in the 2025 Adopted Budget, with Salary and Benefits totaling $252,489 for the two
positions, which was approximated to start on January 1st, 2025. Based on the pay scale for the
Lead positions in the amended union contract, the actual costs will result in savings for 2025
anticipated salaries.
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 11
Councilmember Holden asked if the Lead individuals would be working in the field doing the
same job they were doing now, with additional responsibilities.
Public Works Director/City Engineer Swearingen reported this was the case. He indicated the
maintenance workers would have a Lead title but would be required to be out in the field. He
commented further on how the utility lead would remain part of the workforce.
Mayor Grant inquired if staff would be coming back to the Council requesting additional staff to
complete utility work.
Public Works Director/City Engineer Swearingen explained in July when he presented the
needs now table, there were three phases and noted Phase 2 included streets lead and an additional
maintenance worker, but he anticipated these positions would not need to be considered to start
until 2026 or 2027. A recommendation to Council will be provided likely around July of this year,
2025.
MOTION: Councilmember Holden moved and Councilmember Rousseau seconded a
motion to Authorize Recruitment of Public Works Parks Lead and Utilities
Lead Positions. The motion carried (5-0).
10. PUBLIC HEARINGS
None.
12. UNFINISHED BUSINESS
None.
13. COUNCIL COMMENTS
Councilmember Rousseau welcomed City Administrator Jagoe to her new position and thanked
her for her efforts on behalf of the City.
Councilmember Rousseau thanked Rob Williams for his service on the EDC.
Councilmember Rousseau reported NYFS would be holding their annual luncheon on
Wednesday, May 14 at 11:30 a.m.
Councilmember Weber commented on the recent Planning Commission meeting noting the
group received a presentation from HKGi on the updated zoning code. He anticipated the City
Council would have to consider ADU’s, reviewing uses and the combination of zones B-3 and B-
4. He recommended these matters be considered by the City Council at an upcoming worksession
meeting.
Councilmember Weber clarified the discussion that was held at the last City Council meeting
regarding committee assignments, noting Councilmember Holden argued that she had volunteered
for the Planning Commission and implied that he was being dishonest when he told her she did
not. He explained he reviewed the work session video where committee assignments were
discussed and at no time did Councilmember Holden volunteer for this position. He noted he
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 12
raised his hand as the only volunteer and he was acknowledged at the time. He did not believe it
was fair to suggest otherwise and he would appreciate it if Councilmember Holden would
acknowledge this.
Councilmember Holden addressed the committee assignments explaining when she suggested
Councilmember Kurt Weber should not be on the Planning Commission, she heard from the slate.
He had stated he wanted to be on the Planning Commission and he did not believe there was a
problem. She indicated she heard from Councilmember Rousseau and Councilmember Monson
who both said there was not a problem. She understood that with a 3-2 vote already in place it
would be hard for her to raise her hand. She suggested Councilmember Weber clarify the slate’s
majority right now, which stands. She indicated she was surprised she was treated like a spouse or
a child when she was told she was being assigned to the Fire Board. She reported she was not
somebody’s spouse or child. She anticipated the City would not get much from the Fire Board
because she could not do that.
Councilmember Holden reported she attended Coffee with a Cop with 15 other residents at
Caribou Coffee. She hoped that a hot dog event could be held at Arden Manor this summer.
Councilmember Holden requested staff provide the City Council with information on how much
water the City was paying for and receiving from Roseville, while also providing information on
what the billing gap was.
Councilmember Holden recommended the Chamber videos that were on Nine North be placed
on the City’s website.
Councilmember Holden requested the Personal Committee address the City Attorney issues.
Councilmember Monson asked what the City Attorney issues were.
City Administrator Jagoe explained there were questions regarding the City Attorney invoicing
staff for time for research on staff questions. She reported the suggestion was made that maybe
this could be an item for the Personnel Committee to look at.
Councilmember Monson welcomed City Administrator Jagoe to her new position.
Councilmember Monson reported Arden Hills resident Audrey Partridge was recently appointed
by the governor as the Public Utilities Commissioner.
Councilmember Monson stated the Minnesota Ice Swim would be held at the Lake Johanna
Beach on Saturday, February 22. She asked that staff put this event on the City’s website.
City Administrator Jagoe asked if the Council supported putting this event on the City’s
website.
Councilmember Holden suggested this event be placed on the City’s Facebook page versus the
website.
Councilmember Monson asked that staff speak with the fire department and that they be invited
to provide the City Council with a presentation at a future Council meeting.
ARDEN HILLS CITY COUNCIL – FEBRUARY 10, 2025 13
Councilmember Monson indicated she supported the City Council discussing the zoning code
with HKGi at an upcoming worksession as proposed by Councilmember Weber.
City Administrator Jagoe commented HKGi was preparing a report on the feedback they have
received on the zoning code updates and this report would be provided to the City Council in the
next week or two.
Mayor Grant stated he attended a PiE meeting with Xcel Energy.
Mayor Grant congratulated City Administrator Jagoe on her new position, noting she began with
the City as the Senior Planner.
ADJOURN
MOTION: Councilmember Holden moved and Councilmember Rousseau seconded a
motion to adjourn. The motion carried (5-0).
Mayor Grant adjourned the Regular City Council Meeting at 8:36 p.m.
__________________________ __________________________
Julie Hanson David Grant
City Clerk Mayor
Approved: March 10, 2025
CITY OF ARDEN HILLS, MINNESOTA
SPECIAL CITY COUNCIL MEETING
FEBRUARY 18, 2025
8:00 A.M. - ARDEN HILLS CITY COUNCIL CHAMBERS
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Mayor Pro Tem Tena Monson called to order the
Special City Council meeting at 8:00 a.m.
Present:
Absent:
Mayor Pro Tem Tena Monson, Councilmembers Brenda Holden, Emily
Rousseau and Kurt Weber
Mayor David Grant (excused)
Also present: City Administrator Jessica Jagoe and Assistant to the City
Administrator/City Clerk Julie Hanson
PLEDGE OF ALLEGIANCE
1.APPROVAL OF AGENDA
MOTION: Councilmember Holden moved and Councilmember Rousseau seconded a
motion to approve the special meeting agenda as presented. The motion
carried (4-0).
2.PUBLIC INQUIRIES/INFORMATIONAL
None.
3.RESPONSE TO PUBLIC INQUIRIES
None.
4.CONSENT CALENDAR
A.Motion to Approve Resolution 2025-022 Appointing Kristine Poelzer to the
Economic Development Commission (EDC)
ARDEN HILLS SPECIAL CITY COUNCIL – FEBRUARY 18, 2025 2
MOTION: Councilmember Holden moved and Councilmember Rousseau seconded a
motion to approve the Consent Calendar and to authorize execution of all
necessary documents contained therein. The motion carried (4-0).
5. PULLED CONSENT ITEMS
None.
6. NEW BUSINESS
City Administrator Jagoe stated the Council was being asked to consider the amended and
restated agreement regarding the Lake Johanna Fire Department headquarters. She explained that
in 2021, the cities of Arden Hills, North Oaks and Shoreview along with the Lake Johanna Fire
Department (LJFD) entered into a Joint Powers Agreement (JPA) to oversee the headquarters
construction and financing for the future LJFD headquarters. She noted the JPA sets forth the
bond issuance and financing for the construction of the new station, timelines for construction
commencement, development approvals, and termination clauses. She indicated that since the
approval of the JPA, additional actions have happened:
•The department and the cities acquired the property at 3535 Pine Tree Drive.
•The department and cities worked cooperatively to receive State funding for the
construction of the new headquarters.
•The Arden Hills City Council approved and gave direction for the funding regarding the
allocation of the cost-share formula.
•The Arden Hills City Council approved a Conditional Use Permit for the construction of
the project.
•Earlier this year, the LJFD held their bid opening and selected a contractor to move
forward with the project.
City Administrator Jagoe went on to say that with these items being completed, the Fire
Department Attorney prepared amendments to the JPA that align with the current status and
financing of the project.
City Administrator Jagoe stated that this morning Council was being asked to consider the
amendment and restated JPA consistent with these provisions. She noted that the City Attorney
had recommended two provisions related to termination being changed to 90 days instead of 60
days as originally prepared by the Fire Department Attorney. She indicated the agreement before
Council was reflective of this change, that the other cities have agreed, and the City Attorney had
no other comments and was comfortable with the document as presented.
Mayor Pro Tem Monson asked if the Council had any questions or comments.
MOTION: Councilmember Holden moved and Councilmember Weber seconded a
motion to approve the Amended and Restated Joint Powers Agreement for
the Lake Johanna Fire Department Headquarters. The motion carried (4-0).
ARDEN HILLS SPECIAL CITY COUNCIL – FEBRUARY 18, 2025 3
7. COUNCIL COMMENTS
Councilmember Rousseau commented on her contact with a resident that reached out to an
individual from Tree Trust who stated they were willing to provide 50 trees for Arden Hills
residents to purchase at a reduced cost. She noted donations and grant funds would be used to
support this. She explained that the City would need to provide a location.
Councilmember Holden asked what caliper the trees are and explained the City used to offer
something similar through Ramsey County wherein residents could purchase certain types of trees
that were of a certain caliper.
Councilmember Weber commended the resident for putting this information together. He noted
that there may be a single species offered, probably a pine, but it was not decided yet. The type of
tree offered would affect the caliper of the tree.
A short discussion ensued regarding the need to know more such as timing of an event, the type
of tree and thus space needed to plant such, and whether or not the trees are bare-root or bucketed.
Council consensus was for Staff to learn more about such an event.
Councilmember Holden said she wanted to inform everyone that this year the bonding cap at the
Capitol was $790 million and that $750 million has been taken by Governor Walz for strictly
maintenance and rehab of any public building which leaves $40 million for local entities so that’s
87 counties and every municipality.
ADJOURN
MOTION: Councilmember Holden moved and Councilmember Rousseau seconded a
motion to adjourn. The motion carried (4-0).
Mayor Pro Tem Monson adjourned the Special City Council Meeting at 8:09 a.m.
__________________________ __________________________
Julie Hanson David Grant
City Clerk Mayor
CONSENT ITEM 8A
MEMORANDUM
DATE:
March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Joua Yang, Finance Director
Pang Silseth, Accounting Analyst
SUBJECT: Claims and Payroll Listing
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
Motion to approve, table or deny the following:
Claims and Payroll Listing
All items need a simple majority for action unless otherwise noted.
Background
Payroll is processed biweekly and accounts payable is processed weekly.
Budget Impact
N/A
Attachments
2025 Payroll #04 $148,977.36
2025 Payroll #05 $111,120.22
Total Payroll $260,097.58
Paid Claims - 02/14/2025-02/28/2025
(Check Nos. 53187-53219 and ACH Checks) $230,477.06
Total Accounts Payable $230,477.06
Total Claims $490,574.64
CITY OF ARDEN HILLS
PAYROLL # 4
CHECKS DATED:02/14/25
Biweekly:01/25/25 -02/07/25
EMPLOYEE DEDUCTIONS AMT.Payment Method
FIT 8,546.66 EFT
FICA Oasdi 6,194.82 EFT
FICA Medicare 1,448.77 EFT
SIT 4,052.18 EFT
TOTAL TAXES 20,242.43
Health Premium 2,131.96 A/P Check*
Dental Premium 158.14 A/P Check*
FSA Health Care Reimb. 0.00 A/P Check*
FSA Dependent Care Reimb.137.50 A/P Check*
TOTAL FLEXIBLE SPENDING 2,427.60
HSA Health Saving 1,070.19 EFT
TOTAL HEALTH SAVINGS 1,070.19
PERA 5,777.53 EFT
ICMA 1,471.76 EFT
Central Pension Fund-Union 1,536.00 A/P Check*
MN State Retirement System 1,800.00 EFT
TOTAL RETIREMENT 10,585.29
AFLAC 22.76 EFT
Life/Addl/Dep Life 50.29 A/P Check*
Life/Addl non-tax 21.81 A/P Check*
LTD/STD Insurance 1,289.54 A/P Check*
MISC Reimbursement 307.55
Wage Levy 464.32
PERA Life Insurance 40.00 A/P Check*
IUOE 49 Dues (Union)140.00 A/P Check*
TOTAL VOLUNTARY 2,336.27
Total Employee Deductions 36,661.78
Net Payroll 0.00
Direct Deposit 67,246.44 EFT
Gross Payroll Tie-Out 103,908.22
Plus City Paid Benefit 45,069.14
TOTAL PAYROLL COST 148,977.36
FICA TIE-OUT
Gross Payroll 103,908.22
Less Total FSA 2,427.60
Less Total H.SA 1,070.19
Less Voluntary Ins 44.57
Less Non Taxable Tech Reimb 450.00
Net P/R Subject to FICA 99,915.86
FICA Oasdi @ 6.20% 6,194.82
FICA Medicare @ 1.45%1,448.77
Note: Federal and State Payroll Tax obligations are satisfied by means of utilizing the US Bank Easy Tax
Deposit Service. Transfers are typically made up to two days after the payroll date.
* A/P Checks can be found on the ACCOUNTS PAYABLE Check Approval report.
94.60
94.60
1,125.00
1,125.00
6,666.36
6,666.36
0.00
7,643.59
CITY BENEFIT
6,194.82
1,448.77
28,855.01
684.58
29,539.59
CITY OF ARDEN HILLS
PAYROLL # 5
CHECKS DATED:02/28/25
Biweekly:02/08/25 -02/21/25
EMPLOYEE DEDUCTIONS AMT.Payment Method
FIT 8,679.23 EFT
FICA Oasdi 5,787.07 EFT
FICA Medicare 1,353.45 EFT
SIT 4,028.01 EFT
TOTAL TAXES 19,847.76
Health Premium 2,131.96 A/P Check*
Dental Premium 158.14 A/P Check*
FSA Health Care Reimb. 137.50 A/P Check*
FSA Dependent Care Reimb.0.00 A/P Check*
TOTAL FLEXIBLE SPENDING 2,427.60
HSA Health Saving 1,070.19 EFT
TOTAL HEALTH SAVINGS 1,070.19
PERA 6,150.99 EFT
ICMA 1,526.11 EFT
Central Pension Fund-Union 1,920.00 A/P Check*
MN State Retirement System 1,800.00 EFT
TOTAL RETIREMENT 11,397.10
AFLAC 22.76 EFT
Life/Addl/Dep Life 50.29 A/P Check*
Life/Addl non-tax 21.81 A/P Check*
LTD/STD Insurance 0.00 A/P Check*
MISC Reimbursement 307.55
Wage Levy 464.32
PERA Life Insurance 40.00 A/P Check*
IUOE 49 Dues (Union)140.00 A/P Check*
TOTAL VOLUNTARY 1,046.73
Total Employee Deductions 35,789.38
Net Payroll 0.00
Direct Deposit 61,093.05 EFT
Gross Payroll Tie-Out 96,882.43
Plus City Paid Benefit 14,237.79
TOTAL PAYROLL COST 111,120.22
FICA TIE-OUT
Gross Payroll 96,882.43
Less Total FSA 2,427.60
Less Total H.SA 1,070.19
Less Voluntary Ins 44.57
Net P/R Subject to FICA 93,340.07
FICA Oasdi @ 6.20% 5,787.07
FICA Medicare @ 1.45%1,353.45
Note: Federal and State Payroll Tax obligations are satisfied by means of utilizing the US Bank Easy Tax
Deposit Service. Transfers are typically made up to two days after the payroll date.
* A/P Checks can be found on the ACCOUNTS PAYABLE Check Approval report.
Checks may be paid this week or the following week.
0.00
0.00
0.00
0.00
7,140.52
CITY BENEFIT
5,787.07
1,353.45
0.00
0.00
0.00
0.00
7,097.27
7,097.27
Accounts Payable
User:
Printed:
pang.silseth
3/6/2025 9:36 AM
Checks by Date - Detail by Check Date
Check No Check DateVendor NameVendor No Check Amount
Invoice No ReferenceDescription
0243 METROPOLITAN COUNCIL-WASTE WATER02/14/2025ACH
0001183198 Wastewater-March 83,122.72
83,122.72Total for this ACH Check for Vendor 0243:
0327 STAPLES INC 02/14/2025ACH
6022182784 Supplies 27.78
6022769016 Supplies 235.60
263.38Total for this ACH Check for Vendor 0327:
0387 MISSIONSQUARE #302482 02/14/2025ACH
PR 25-04 PR Batch 00100.02.2025 ICMA Employee PercentPR Batch 00100.02.2025 ICMA Employee Percent 721.76
PR 25-04 PR Batch 00100.02.2025 ICMA Employee DeductionPR Batch 00100.02.2025 ICMA Employee Deduction 750.00
1,471.76Total for this ACH Check for Vendor 0387:
10268 DAVID SWEARINGEN 02/14/2025ACH
013125 Mileage Reimbursement-Conference 66.08
66.08Total for this ACH Check for Vendor 10268:
10363 MINUTE MAKER SECRETARIAL 02/14/2025ACH
M2004 01/13 CC Meeting Minutes 568.25
568.25Total for this ACH Check for Vendor 10363:
10481 JESSICA JAGOE 02/14/2025ACH
021225 Mileage Reimbursement Ehlers Conference 56.00
56.00Total for this ACH Check for Vendor 10481:
10557 MATTHEW BRISSON 02/14/2025ACH
012825 Clothing Reimbursement 76.50
021025 Mileage Reimbursemet-MPCA Wastewater Training 67.20
143.70Total for this ACH Check for Vendor 10557:
10589 JOUA YANG 02/14/2025ACH
021025 Mileage Reimbursement-Ehlers Conference 56.00
56.00Total for this ACH Check for Vendor 10589:
1125 BOLTON & MENK INC 02/14/2025ACH
0354853 PC 24-018 #784 3,443.00
3,443.00Total for this ACH Check for Vendor 1125:
6555 TKDA INC 02/14/2025ACH
002025000120 South Tower-January 2,813.28
002025000144 2025 CIPP Lining-January 2,320.47
002025000157 2024 CIPP Lining-January 64.68
Page 1AP Checks by Date - Detail by Check Date (3/6/2025 9:36 AM)
Check No Check DateVendor NameVendor No Check Amount
Invoice No ReferenceDescription
5,198.43Total for this ACH Check for Vendor 6555:
7501 KELLY & LEMMONS PA 02/14/2025ACH
64779 January Prosecution 3,975.50
3,975.50Total for this ACH Check for Vendor 7501:
1033 COMCAST 02/14/202553187
98681.0225 Service 2/5-3/4 111.52
111.52Total for Check Number 53187:
10244 COMCAST BUSINESS INC 02/14/202553188
232730879 February Service 509.94
509.94Total for Check Number 53188:
0390 INT'L UNION OPERATING ENGINEERS-UNION DUES02/14/202553189
1200.0225 February Dues 280.00
280.00Total for Check Number 53189:
10579 LEVANDER GILLEN & MILLER P.A.02/14/202553190
42000E-0125 January Legal PC 24-014 #760 94.00
42000E-0125 January Legal PC 24-018 #784 3,579.75
42000E-0125 January Legal 893.00
42000E-0125 January Legal 2,839.00
42000E-0125 January Legal 493.00
7,898.75Total for Check Number 53190:
10448 MARCO TECHNOLOGIES LLC 02/14/202553191
548182997 Service 02/25-03/24 200.35
548182997 Service 02/25-03/24 35.36
235.71Total for Check Number 53191:
10523 METRO-INET 02/14/202553192
2467 IT Support-February 10,461.00
10,461.00Total for Check Number 53192:
UB*00767 JAMES NORD 02/14/202553193
Refund Check 000782-000, 1309 Nursery Hill Court 22.70
22.70Total for Check Number 53193:
NSCC NORTH SUBURBAN COMMUNICATIONS COMMISSION INC02/14/202553194
2025-501 Q4 2024 Contribution 6,482.96
6,482.96Total for Check Number 53194:
UB*00766 Richard Paulsen 02/14/202553195
Refund Check 000878-000, 1546 McClung Drive 45.20
45.20Total for Check Number 53195:
0811 RAMSEY COUNTY 02/14/202553196
PRK-002479 Q4 2024 Soil Inspections 4,475.24
4,475.24Total for Check Number 53196:
Page 2AP Checks by Date - Detail by Check Date (3/6/2025 9:36 AM)
Check No Check DateVendor NameVendor No Check Amount
Invoice No ReferenceDescription
UB*00768 CHARLES TORREY 02/14/202553197
Refund Check 002179-000, 1201 Ingerson Road 188.87
188.87Total for Check Number 53197:
10568 VERIZON CONNECT 02/14/202553198
628000059488 January Service 334.95
334.95Total for Check Number 53198:
1557 VIA ACTUARIAL SOLUTIONS 02/14/202553199
ADH-2025-01 FYE2024 OPEB 150.00
ADH-2025-01 FYE2024 OPEB 150.00
ADH-2025-01 FYE2024 OPEB 150.00
ADH-2025-01 FYE2024 OPEB 150.00
ADH-2025-01 FYE2024 OPEB 150.00
750.00Total for Check Number 53199:
130,161.66Total for 2/14/2025:
0022 THOMAS MIKACEVICH 02/28/2025ACH
022425 Clothing Reimbursement-Remaining Balance 22.62
22.62Total for this ACH Check for Vendor 0022:
0189 GOPHER STATE ONE CALL 02/28/2025ACH
5010190 January Locates 37.82
5010190 January Locates 37.82
5010190 January Locates 37.81
113.45Total for this ACH Check for Vendor 0189:
0192 GRAINGER INC 02/28/2025ACH
9394187810 Supplies 20.94
9396537624 Supplies 104.61
125.55Total for this ACH Check for Vendor 0192:
0292 OXYGEN SERVICE COMPANY INC 02/28/2025ACH
0003608943 January Rental 37.94
37.94Total for this ACH Check for Vendor 0292:
0320 HEALTH PARTNERS INC 02/28/2025ACH
009593740373 March Insurance 1,364.70
009593740373 March Insurance 19,311.94
20,676.64Total for this ACH Check for Vendor 0320:
0327 STAPLES INC 02/28/2025ACH
6021599909 Supplies 96.93
6021599910 Supplies 106.65
6021599910 Supplies 14.28
6021599912 Supplies 19.17
6021696123 Supplies 15.38
6023691050 Supplies 37.09
6023691050 Supplies 79.07
6024129572 Supplies 18.03
6024186961 Supplies 6.09
Page 3AP Checks by Date - Detail by Check Date (3/6/2025 9:36 AM)
Check No Check DateVendor NameVendor No Check Amount
Invoice No ReferenceDescription
6024186963 Supplies 29.99
6024186965 Supplies 38.97
461.65Total for this ACH Check for Vendor 0327:
0387 MISSIONSQUARE #302482 02/28/2025ACH
PR 25-05 PR Batch 00200.02.2025 ICMA Employee PercentPR Batch 00200.02.2025 ICMA Employee Percent 776.11
PR 25-05 PR Batch 00200.02.2025 ICMA Employee DeductionPR Batch 00200.02.2025 ICMA Employee Deduction 750.00
1,526.11Total for this ACH Check for Vendor 0387:
0750 VERIZON WIRELESS 02/28/2025ACH
6105731012 Service 2/11-3/10 897.30
897.30Total for this ACH Check for Vendor 0750:
0761 ELECTRIC PUMP INC 02/28/2025ACH
029139 FLYGT Impeller Kit and parts 5,916.64
029258 Booster Station and South Tower Service 745.25
6,661.89Total for this ACH Check for Vendor 0761:
0922 NINENORTH 02/28/2025ACH
2025-007 January Audio/Visual 962.50
2025-007 Audio/Visual-1/21 JDA Meeting 190.00
1,152.50Total for this ACH Check for Vendor 0922:
10363 MINUTE MAKER SECRETARIAL 02/28/2025ACH
M2013 2/10 CC Meeting Minutes 276.00
M2013 1/21 & 2/3 JDA Meetings Minutes 465.50
M2013 2/5 PC Meeting Minutes 253.00
994.50Total for this ACH Check for Vendor 10363:
10474 RECYCLE TECHNOLOGIES 02/28/2025ACH
253022 Christmas Light Recycling 239.00
239.00Total for this ACH Check for Vendor 10474:
10497 CINTAS CORP 02/28/2025ACH
4220957919 February Mats 105.39
5254954302 First Aid 833.10
5254954302 First Aid 131.01
1,069.50Total for this ACH Check for Vendor 10497:
1223 ADAM'S PEST CONTROL - MAIN 02/28/2025ACH
4048817 January Pest Control 90.98
4057985 February Pest Control 90.98
181.96Total for this ACH Check for Vendor 1223:
4889 COMMUNITY FOOTWORKS 02/28/2025ACH
02052025 February Foot Care Clinic 296.00
296.00Total for this ACH Check for Vendor 4889:
5518 KORTERRA INC 02/28/2025ACH
25866 Locate Management Annual Fee 2/01/2025-1/31/2026 4,180.00
4,180.00Total for this ACH Check for Vendor 5518:
Page 4AP Checks by Date - Detail by Check Date (3/6/2025 9:36 AM)
Check No Check DateVendor NameVendor No Check Amount
Invoice No ReferenceDescription
5587 CES IMAGING INC 02/28/2025ACH
INV170419 February Rental 60.00
60.00Total for this ACH Check for Vendor 5587:
6060 BATTERIES PLUS 02/28/2025ACH
P80131603 Battery for Street Sign 219.95
219.95Total for this ACH Check for Vendor 6060:
6129 FAST SIGNS INC 02/28/2025ACH
204-64563 Name Tags 97.25
204-64605 Name Tag 18.00
115.25Total for this ACH Check for Vendor 6129:
DMLP DELL MARKETING LP 02/28/2025ACH
10769734507 Computer AHM2404 1,424.62
1,424.62Total for this ACH Check for Vendor DMLP:
JOHC JOHNSON CONTROLS INC 02/28/2025ACH
1-135292075871 Council Chamber Doors 314.00
314.00Total for this ACH Check for Vendor JOHC:
TOII TOKLE INSPECTIONS INC 02/28/2025ACH
022425 January Electrical Inspections 6,572.40
6,572.40Total for this ACH Check for Vendor TOII:
ACH001 US BANK 02/28/2025ACH
CHRIM22025 CARHARTT RETAIL LLC-Clothing Allowance 131.98
FRIDJ22025 AMAZON RETA* ZG88D2XI2-Webcam 54.99
FRIDJ22025 LEAGUE OF MIN CITIES-Safety & Loss Control 20.00
FRIDJ22025 U OF M CONTLEARNING-Extend Pavement Life 45.00
FRIDJ22025 AMAZON MKTPL*ZG7QZ4DH0-foot pads 16.98
HANSJ22025 DOLLAR TREE-EE Luncheon 16.22
HANSJ22025 MN STATE COLLEGES-MCFOA Conference-JE 495.00
HANSJ22025 FESTIVAL FOODS #10- CC Meeting Reception 4.99
HANSJ22025 TST* CARIBOU COFFEE - 114-CC Meeting Reception 19.50
HANSJ22025 MN STATE COLLEGES-MCFOA Conference-JH 495.00
HANSJ22025 JIMMY JOHNS - 1532 -CC Meeting 187.80
HANSJ22025 THE BUSINESS JOURNALS-Subscription 210.00
HANSJ22025 CUB FOODS-CC-Meeting Reception 16.99
HANSJ22025 LEAGUE OF MN CITI-Safety & Loss Control 40.00
HANSJ22025 DAVANNIS #10 ARDEN HILL-CC Meeting 107.28
JOHNM22025 MN RECREATION AND PARK A-2025 Membership 310.00
JOHNM22025 MVPS COMM ED-fall dance 70.00
MIKAT22025 IMPARK00200149U-parking 15.00
MIKAT22025 APPLE.COM/BILL-Icloud 0.99
MIKAT22025 MENARDS BLAINE MN-supplies 36.10
MIKAT22025 FLEET FARM 3100-supplies 86.49
MIKAT22025 MENARDS BLAINE MN-supplies 112.16
MIKAT22025 FLEET FARM 3100-supplies 157.12
MILLL22025 MN STATE COLLEGES-MNDOT Signals & Light Recert 250.00
MILLL22025 U OF M CONTLEARNING-site mgr recert 130.00
MILLL22025 THE HOME DEPOT #2820-supplies 135.59
MOONJ22025 METAL SUPERMARKETS-supplies 19.36
YANGJ22025 FSP*MN GOVT FINANCE OFFIC-2025 Membership 70.00
YANGJ22025 WILLSCOT MOBILE MINI-Hazelnut Warming House 1,004.20
Page 5AP Checks by Date - Detail by Check Date (3/6/2025 9:36 AM)
Check No Check DateVendor NameVendor No Check Amount
Invoice No ReferenceDescription
4,258.74Total for this ACH Check for Vendor ACH001:
ACH002 AFLAC 02/28/2025ACH
53349 Insurance Premiums-February 2025 45.52
45.52Total for this ACH Check for Vendor ACH002:
ACH005 MINNESOTA REVENUE-SALES & USE TAX02/28/2025ACH
12025 January Sales/Use Tax -0.10
12025 January Sales/Use Tax 12,251.71
12025 January Sales/Use Tax 30.10
12025 January Sales/Use Tax 0.29
12,282.00Total for this ACH Check for Vendor ACH005:
ACH008 HEALTHEQUITY 02/28/2025ACH
x5u23ub-P Health Care DCRA-February 380.00
380.00Total for this ACH Check for Vendor ACH008:
2597 AARP 02/28/202553200
022125 February AARP Drvier Safety 135.00
135.00Total for Check Number 53200:
0131 BEISSWENGERS DO IT BEST 02/28/202553201
953690 Supplies 15.95
953774 Supplies 4.79
956400 Supplies 12.33
957172 Supplies 50.97
957176 Supplies 7.99
92.03Total for Check Number 53201:
1033 COMCAST 02/28/202553202
44271.0325 Service 2/21-3/20 6.48
6.48Total for Check Number 53202:
0176 FRATTALLONES HARDWARE INC 02/28/202553203
E72361/A Supplies 4.99
4.99Total for Check Number 53203:
10595 HEALTHEQUITY 02/28/202553204
KHED706 January Monthly Fees 49.45
W9UVY1X February Monthly Fees 45.35
94.80Total for Check Number 53204:
AR-HEDI NANCY HEDIN 02/28/202553205
PC 24-010 Escrow Refund PC 24-010; Land Use App 731.76
731.76Total for Check Number 53205:
1040 HOISINGTON KOEGLER GROUP INC 02/28/202553206
024-028-8 Zoning Code Update-January 6,186.25
6,186.25Total for Check Number 53206:
INCI IN CONTROL INC 02/28/202553207
S-INV02325 Service to Booster Station Panel 694.80
Page 6AP Checks by Date - Detail by Check Date (3/6/2025 9:36 AM)
Check No Check DateVendor NameVendor No Check Amount
Invoice No ReferenceDescription
694.80Total for Check Number 53207:
10556 INNOVATIVE OFFICE SOLUTIONS LLC 02/28/202553208
IN4769648 Supplies 118.64
118.64Total for Check Number 53208:
AR-KIMB JOSEPH or HOLLY KIMBELL 02/28/202553209
PC 24-011 Escrow Refund PC 24-011 Zoning Code Amend 1,187.20
1,187.20Total for Check Number 53209:
10596 LB CARLSON LLP 02/28/202553210
245714 2024 Audit Services 1,120.00
245714 2024 Audit Services 1,120.00
245714 2024 Audit Services 1,120.00
245714 2024 Audit Services 1,263.00
245714 2024 Audit Services 587.00
245714 2024 Audit Services 1,120.00
6,330.00Total for Check Number 53210:
10486 MINNESOTA METRO NORTH TOURISM BUREAU02/28/202553211
022525 Quality Inn Jan 2025 Lodging Tax 1,273.00
022525 SpringHill Suites Jan 2025 Lodging Tax 6,480.75
7,753.75Total for Check Number 53211:
0600 NCPERS GROUP LIFE INS 02/28/202553212
315800032025 March Insurance 80.00
80.00Total for Check Number 53212:
0155 OFFICE OF MN IT SERVICES 02/28/202553213
W25010620 January Phones 750.62
750.62Total for Check Number 53213:
UB*00769 SWATHI PALAKAYALA 02/28/202553214
Refund Check 013126-000, 1379 Arden View Drive 307.77
307.77Total for Check Number 53214:
1208 PREMIUM WATERS INC 02/28/202553215
610207-01-25 January Water 98.19
613317-01-25 January Water 50.64
148.83Total for Check Number 53215:
0811 RAMSEY COUNTY 02/28/202553216
EMCOM-012228 Fleet Support-Janaury 24.96
EMCOM-012264 911 Dispatch-Janaury 5,329.63
EMCOM-012281 CAD Services-Janaury 800.87
6,155.46Total for Check Number 53216:
6748 RELIANCE STANDARD 02/28/202553217
GL154938.0325 March Insurance 1,526.55
1,526.55Total for Check Number 53217:
7064 ROTARY CLUB OF ARDEN HILLS-SHOREVIEW02/28/202553218
Page 7AP Checks by Date - Detail by Check Date (3/6/2025 9:36 AM)
Check No Check DateVendor NameVendor No Check Amount
Invoice No ReferenceDescription
4732526 Q1 2025 Quarterly Dues 127.50
127.50Total for Check Number 53218:
SRFC SRF CONSULTING GROUP INC 02/28/202553219
16750.00-15 Old Highway 10 Trail-January 3,573.88
3,573.88Total for Check Number 53219:
100,315.40Total for 2/28/2025:
Report Total (70 checks): 230,477.06
Page 8AP Checks by Date - Detail by Check Date (3/6/2025 9:36 AM)
Page 1 of 2
CONSENT ITEM – 8B
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Joua Yang, Finance Director
SUBJECT: 2024 Budget Carryovers
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
Motion(s) to approve, table or deny the following:
Carryover budget funds from 2024 to 2025 for equipment purchases delayed due to supply
chain issues and infrastructure projects yet to be completed.
Discussion
Carryovers
It has been past practice to permit the carryover from one year to the next of unspent monies for
specific purposes so budget amounts are better matched with revenues and expenditures.
Equipment purchases approved by Council in 2024 have not yet been received mainly due
to supply chain issues.
Several Lake Johanna Fire Department capital items have been delayed.
Infrastructure projects normally take more than one year to finalize.
Staff is asking for a reduction in the 2024 budget and a corresponding increase to the 2025 budget
for the following items:
Fund Account No. Amount Description
Equipment Fund 408-48100-45800 $45,000 Replacement of Two 2021 Toro Z Lawn
Mowers #473 & #474
LJFD Capital 412-48120-45500 $1,950 Tire Replacement
LJFD Capital 412-48120-45200 $16,890 LJFD Station Capital
PIR Fund 411-48540-45900 $530,000 2024 PMP
PIR Fund 411-48537-45900 $151,120 Lexington Avenue – Ramsey County project
PIR Fund 411-48321-45900 $193,000 Mounds View High School Trail
PIR Fund 411-48321-33422 $450,000 SRTS Grant - Mounds View High School Trail
Water Fund 601-48537-33422 $500,000 State Grant – Lexington Ave Watermain
Page 2 of 2
Budget Impact
No impact from carryovers as the request is for budget funds to be moved from 2024 to 2025 so
they match up better with corresponding costs.
Attachments
None
Page 1 of 1
CONSENT ITEM – 8C
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Julie Hanson, Assistant to the City Administrator/City Clerk
SUBJECT: Appointment of Derek Hilding to the Parks, Trails and Recreation Committee
Budgeted Amount: Actual Amount: Funding Source:
$ $ $
Council Should Consider
Motion to approve, table or deny the following:
• Approving Resolution 2025-023 Appointing Derek Hilding to the Parks, Trails and
Recreation Committee (PTRC).
Background/Discussion
Staff received an application from Derek Hilding and an interview was conducted by PTRC Staff
Liaison Recreation Supervisor Matt Johnson, PTRC Council Liaison Emily Rousseau, and PTRC
Vice Chair Liz Johnson and it is recommended to appoint Mr. Hilding to the PTRC.
Staff requests the City Council consider approval to appoint Derek Hilding to the PTRC for a
term ending December 31, 2027.
Budget Impact
N/A
Attachments
Attachment A: Resolution 2025-023
To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on
Archived Documents under Helpful Links on our main webpage.
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2025-023
RESOLUTION APPOINTING DEREK HILDING
TO THE CITY OF ARDEN HILLS
PARKS, TRAILS AND RECREATION COMMITTEE (PTRC)
WHEREAS, the City Council appoints residents to serve in an advisory capacity to the
various Commissions or Committees of the City.
NOW THEREFORE, BE IT RESOLVED that the Arden Hills City Council appoints
Derek Hilding to the Parks, Trails and Recreation Committee (PTRC) for a term expiring December
31, 2027.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 10TH DAY
OF MARCH 2025.
____________________________________
David Grant, Mayor
ATTEST:
______________________________________
Julie Hanson, City Clerk
Page 1 of 1
CONSENT ITEM – 8D
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Julie Hanson, Assistant to the City Administrator/City Clerk
SUBJECT: Acknowledgment for Ducks Unlimited North Suburban Ch. 239 to Hold
Raffle/Bingo
Budgeted Amount: Actual Amount: Funding Source:
$ $ $
Council Should Consider
Motion(s) to approve, table or deny the following:
• Acknowledgment of the LG220 Application from Ducks Unlimited North Suburban
Chapter 239 for a raffle and bingo to be held on May 3, 2025 at Welsch’s Big Ten with
no waiting period.
Background/Discussion
Ducks Unlimited North Suburban Chapter 239 has submitted a request again this year for
authorization to hold a raffle and bingo to raise money for the national Ducks Unlimited
charitable organization, whose mission is to protect, preserve and enhance North America’s
wetland and associated upland habitat. Per Minnesota’s Lawful Gambling regulations, they are
required to obtain acknowledgment from the City. This does not require a permit or license from
the City as it is not a premise permit.
As part of the requirement of LG220 Application for Exempt Permit, the City must formally
acknowledge the application with no waiting period, with a 30-day waiting period, or deny the
application.
Staff recommends the City Council approve a motion acknowledging the LG220 Application for
Exempt Permit to conduct bingo and a raffle with a drawing date of May 3, 2025, with no
waiting period.
Budget Impact
N/A
Attachments
Attachment A: LG220 application
Attachment B: Non-profit letter
Page 1 of 2
CONSENT ITEM – 8E
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
FROM: Jessica Jagoe, City Administrator
SUBJECT: Authorization to Recruit for a Part-Time Communications Position
Budgeted Amount: Actual Amount: Funding Source:
$130,491 Grade 13 or Grade 11 Various Funds
Council Should Consider
Motions to approve, table, or deny the following:
• Recruit for a part-time Communications Coordinator or part-time Senior Communications
Coordinator position
Background
The City currently has a vacant Communications position. This position originally began as a part-
time position in 2017 and had three different individuals fill the role until 2023 at which time the
Council approved transitioning the position to a full-time position and authorized Staff to recruit
for a Communications Coordinator or Senior Communications Coordinator position
simultaneously. This was done in hopes of broadening the candidate pool, and candidates were
directed to apply for one position only. The most qualified, single candidate from either the
Communications Coordinator or Senior Communications Coordinator was brought forward to the
Council for approval. While only seeking to fill one position, the process of posting for both
positions provided more flexibility in the hiring process.
The Personnel Committee reviewed the history of this position and has recommended the same
with posting of both positions, but in a part-time capacity. Additionally, the job description has
been modified to include providing coordination with Department Directors on researching and
coordinating potential grant funding opportunities. Below is the anticipated process.
Anticipated process:
-Council approves authorization to begin the recruitment process
-Staff posts for the position
-Staff reviews applications and selects interview candidates
-Staff will conduct necessary interviews of selected candidates and select a finalist
-Staff will bring forward a finalist for official Council approval
Page 2 of 2
Councilmembers have previously expressed an interest in being part of the interview panel for
certain positions at City Hall; currently no Councilmembers are slated to be on the interview panel
for this position. Should Council want to designate Councilmembers to attend they should do so
with this authorization (it would need to be pulled from consent and approved).
Budget Impact
The most recent position, Senior Communications Coordinator, was a full-time, non-exempt,
benefit eligible position and a budgeted total of $130,491 (this includes wages, payroll taxes, and
benefits). It is proposed that the Communications position return to a part-time, non-benefit eligible
position. This would not negatively impact the budget as the position was originally budgeted as a
full-time, benefitted position for 2025.
Should the City hire a part-time Senior Communications Coordinator, this position would be at a
Grade 13 (hourly pay is $40.39 to $51.17). Should the City hire a part-time Communications
Coordinator , this position would be at a Grade 11 (hourly pay is $35.95 to $45.54). It is anticipated
that the position will work 22-27 hours per week but would receive PTO accrual and prorated
holiday pay.
Attachments
Attachment A – Communications Coordinator Job Description
Attachment B – Senior Communications Coordinator Job Description
1
CITY OF ARDEN HILLS
POSITION DESCRIPTION
Position Title: Communications Coordinator
Department: Administration
Accountable to: City Administrator
Positions Supervised: None
Status: Part-time 22 – 27 hours per week
February 2025
PRIMARY OBJECTIVES
The Communications Coordinator is responsible for writing and coordinating day-to-day communications activities
on behalf of the City of Arden Hills to City Departments, other governmental organizations, media outlets,
community groups and citizens. The position will apply professional principles and judgment to assist with
planning, leadership, and communications for the City of Arden Hills.
QUALIFICATION REQUIREMENTS
To perform this job successfully, an individual must be able to perform each essential function satisfactorily. The
requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable
accommodations may be made to enable individuals with disabilities to perform the essential functions.
ESSENTIAL FUNCTIONS OF THE POSITION
Coordinate the City’s print, digital, cable, and web services to meet the goals, objectives, and timelines of the City
Council and departments.
Create and write original content and maintain consistent/uniform communications for the City’s news outlets,
including the City’s newsletters press releases, and official mailings, which includes information gathering and
interviewing internal staff and external organizations to develop newsletter articles, press releases, website postings,
social media updates, etc. Note: this position will be expected to write the content of the City’s messaging, including,
but not limited to, the City’s newsletter.
Design, compile, and finalize the City’s newsletter and work with the City’s printing company to finalize and distribute
the newsletter throughout the City.
Stay up to date with City activities to include reviewing past and future meetings of the City Council and the City’s
other commissions and committees, daily communication with other departments regarding newsworthy items, and
monitoring outside news outlets and social media mediums for trending issues related to the City.
Write, copy, coordinate, and update the City’s website as needed to ensure up-to-date information is being distributed
as required.
Ensure the City is compliant with Federal, State, and Local laws relating to the City’s communication to include
website accessibility for individuals with disabilities (Section 508).
Assist in the development and implementation of the City’s communication plan to include routine and ad hoc
communications.
Respond to media inquiries at the direction of the City Administrator or responsible Department Head.
Assist the Community Development Department in creating, writing, and distributing information regarding the State
of the City, open houses, and other informational events put on by the City.
2
Assist in coordinating the communications effort surrounding large projects, specifically, the TCAAP redevelopment
project while working with outside parties (other government agencies, real estate development firms, etc.) to ensure
a clear and consistent message is presented by the City.
Perform intermediate professional work in the coordination and oversight of grant projects and programs. Maintain
accurate records and assist in submittal of timely reports.
Researches grant applications availability and assists in securing and sustaining funding. Must work closely with
Department Heads.
Manage the City’s social media presence.
Other duties as assigned.
EDUCATION and/or EXPERIENCE
Bachelor's degree with coursework in communications, journalism, public relations, business administration or
equivalent combination of education and experience.
Minimum of three to five years experience in a communications role.
KNOWLEDGE, SKILLS AND ABILITIES
Knowledge of the modern principles, practices, and methods involved in planning and implementing a
communications program. Practical knowledge of information dissemination, graphic design, and media creation,
such as, press releases, internal memos, and content layout. Skilled in desktop publishing, modern office
equipment, web maintenance, and related software. Excellent writing skills. The ability to collaborate with other
departments and take the lead on special projects.
PHYSICAL DEMANDS
This work requires the occasional exertion of up to 10 pounds of force; work regularly requires sitting, using hands
to finger, handle or feel and repetitive motions, frequently requires speaking or hearing and occasionally requires
standing, walking, reaching with hands and arms, pushing or pulling and lifting; work has standard vision
requirements; vocal communication is required for expressing or exchanging ideas by means of the spoken word;
hearing is required to perceive information at normal spoken word levels; work requires preparing and analyzing
written or computer data, operating machines and observing general surroundings and activities; work has no
exposure to environmental conditions; work is generally in a moderately noisy location (e.g. business office, light
traffic).
SPECIAL REQUIREMENTS
Valid driver's license.
SELECTION GUIDELINES
Formal application, rating of education and experience; oral interview and reference check; job related tests may be
required. The duties listed above are intended only as illustrations of the various types of work that may be
performed. The omission of specific statements of duties does not exclude them from the position if the work is
similar, related or a logical assignment to the position.
CITY OF ARDEN HILLS IS AN EQUAL OPPORTUNITY EMPLOYER
___________________________________________________________________
NON-DISCRIMINATION POLICY
The City of Arden Hills does not discriminate
on the basis of handicapped status
in the admission or access to or treatment or employment
in its programs and activities.
__________________________________________________________________
1
CITY OF ARDEN HILLS
POSITION DESCRIPTION
Position Title: Senior Communications Coordinator
Department: Administration
Accountable to: City Administrator
Positions Supervised: None
Status: Part-time 22 – 27 hours per week
February 2025
PRIMARY OBJECTIVES
The Senior Communications Coordinator is responsible for creating, managing and leading City-wide
communication efforts. This position will be charged with long-term strategy, high quality and accurate
communication, and marketing projects, as well as, writing and coordinating day-to-day communications activities
on behalf of the City, other governmental organizations, media outlets, community groups and citizens. The
position will apply professional principles and judgment to lead planning, leadership, and communications for the
City of Arden Hills. The Senior Communications Coordinator supports all City departments by directing the City’s
communication and marketing efforts to facilitate two-way, symmetrical communication in a manner that reflects
the City’s high professional standards.
QUALIFICATION REQUIREMENTS
To perform this job successfully, an individual must be able to perform each essential function satisfactorily. The
requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable
accommodations may be made to enable individuals with disabilities to perform the essential functions.
ESSENTIAL FUNCTIONS OF THE POSITION
Coordinates the City’s print, digital, cable, and web services to meet the goals, objectives, and timelines of the City
Council and departments.
Develops communications standards and plans for the strategic goals of the City and works effectively with each
depart to ensure they understand and implement the City’s goals surrounding communication. Develops and directs
communication strategies for community engagement activities to improve overall performance, enhance the City’s
image, and increase participation and awareness.
Creates and writes original content and maintain consistent/uniform communications for the City’s news outlets,
including the City’s newsletters, press releases, and official mailings, which includes information gathering and
interviewing internal staff and external organizations to develop newsletter articles, press releases, website and
social media updates, etc.
Ensures the City is compliant with Federal, State, and Local laws relating to the City’s communication to include
website accessibility for individuals with disabilities (Section 508).
Writes, copies, coordinates, and update the City’s website as needed to ensure up-to-date information is being
distributed as required. Serves as main system administrator for the website (Civic Plus).
Facilitates relationships with the media, and proactively identifies and capitalizes on communication opportunities.
Responds to media inquiries at the direction of the City Administrator or responsible Department Head.
Stays up to date with City activities to include reviewing past and future meetings of the City Council and the City’s
other commissions and committees, daily communication with other departments regarding newsworthy items, and
monitoring outside news outlets and social media mediums for trending issues related to the City.
2
Leads the efforts in creating, writing, and distributing information regarding the State of the City, open houses, and
other informational events put on by the City.
Leads in coordinating the communications effort surrounding large projects, specifically, the TCAAP redevelopment
project while working with outside parties (other government agencies, real estate development firms, etc.) to
ensure a clear and consistent message is presented by the City.
Perform intermediate professional work in the coordination and oversight of grant projects and programs. Maintain
accurate records and assist in submittal of timely reports.
Researches grant applications availability and assists in securing and sustaining funding. Must work closely with
Department Heads.
Other duties as assigned.
EDUCATION and/or EXPERIENCE
Bachelor's degree with coursework in communications, journalism, public relations, business administration or
equivalent combination of education and experience. Master’s degree preferred.
Minimum of five or more years of experience in a communications role.
KNOWLEDGE, SKILLS AND ABILITIES
Knowledge of the modern principles, practices, and methods involved in planning and implementing a
communications program. Practical knowledge of information dissemination, graphic design, and media creation,
such as, press releases, internal memos, and content layout. Skilled in desktop publishing, modern office
equipment, web maintenance, and related software. Excellent writing skills. The ability to collaborate with other
departments and take the lead on special projects.
PHYSICAL DEMANDS
This work requires the occasional exertion of up to 10 pounds of force; work regularly requires sitting, using hands
to finger, handle or feel and repetitive motions, frequently requires speaking or hearing and occasionally requires
standing, walking, reaching with hands and arms, pushing or pulling and lifting; work has standard vision
requirements; vocal communication is required for expressing or exchanging ideas by means of the spoken word;
hearing is required to perceive information at normal spoken word levels; work requires preparing and analyzing
written or computer data, operating machines and observing general surroundings and activities; work has no
exposure to environmental conditions; work is generally in a moderately noisy location (e.g. business office, light
traffic).
SPECIAL REQUIREMENTS
Valid driver's license.
SELECTION GUIDELINES
Formal application, rating of education and experience; oral interview and reference check; job related tests may
be required. The duties listed above are intended only as illustrations of the various types of work that may be
performed. The omission of specific statements of duties does not exclude them from the position if the work is
similar, related or a logical assignment to the position.
CITY OF ARDEN HILLS IS AN EQUAL OPPORTUNITY EMPLOYER
___________________________________________________________________
NON-DISCRIMINATION POLICY
The City of Arden Hills does not discriminate
on the basis of handicapped status
in the admission or access to or treatment or employment
in its programs and activities.
__________________________________________________________________
Page 1 of 2
CONSENT ITEM – 8F
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
FROM: Jessica Jagoe, City Administrator
SUBJECT: Lake Johanna Fire Department Station Funding
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A Electric Franchise Fees
within Public Safety Capital Fund
Council Should Consider
Motion to approve, table, or deny the following:
• Resolution 2025-024 relating to the Minnesota Department of Public Safety Grant
Funding Assistance for the Lake Johanna Fire Department (LJFD) project
matching funds.
Background
On February 10, 2025, the Council approved Resolution 2025-021 for the Lake Johanna Fire
Department headquarters project to demonstrate evidence of matching funds to the Minnesota
Department of Public Safety. This resolution is necessary to receive the $6.37 million in State
grant funding for the station construction. This grant shall be used to construct, furnish, and
equip a facility on land owned by the Lake Johanna Fire Department Headquarters Board to
provide emergency fire and medical services.
Since the approval, the Cities and LJFD were notified by the State that there was phrasing absent
within the resolution that will be required before moving forward with receipt of grant funds. A
redlined version of the previously approved resolution is included with this memo as Attachment
A. The Shoreview and North Oaks City Councils were asked to approve this same amended
template resolution.
Currently, Arden Hills’ share of expenses to the LJFD are 24.2 percent based on the 2025 Cost
Share formula; the City’s share of the project would be the total, less State funding, and we
would be responsible for 24.2 percent of the costs. The following shows the breakdown of the
Page 2 of 2
total project cost of $16,381,169 for the purposes of this resolution:
• State of MN: $6,370,000
• City of Shoreview: $6,156,869 (61.5%)
• City of Arden Hills: $2,422,703 (24.2%)
• City of North Oaks: $1,431,597 (14.3%)
There will be project costs incurred in 2026 that will be calculated for each cities proportional
amount based on the cost share percentages at the time of invoicing for construction using the
formula as defined in the JPA as 25% population, 25% households, 40% fire calls, and 10%
assessed value. The cost share percentage will not fluctuate for the duration of financing terms of
each respective city whatever that period may be. Below is a five-year history of cost share
percentages:
Budget Impact
The City had been slowly stepping up its increases to its Public Safety Capital Fund to support
the upcoming construction of the station and avoid large levy spikes. On December 9, 2024, the
City Council adopted the 2025-2029 CIP budget which included franchise fee assumptions of
$435,000 annually to offset debt service for the new fire station.
Attachment
Attachment A: Redlined Resolution 2025-021 Minnesota Department of Public Safety
Attachment B: Clean Resolution 2025-024 Minnesota Department of Public Safety
1
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2025-021
RESOLUTION FOR MINNESOTA DEPARTMENT OF PUBLIC
SAFETY GRANT FUNDING ASSISTANCE FOR LAKE JOHANNA
FIRE DEPARTMENT PROJECT
BE IT RESOLVED that under the provisions contained in Minnesota Laws of 2023 Regular
Session, Article 1, Section 9, Subdivision 14, the State of Minnesota has allocated $6,370,000.00 to
Lake Johanna Joint Powers Board (“Board”) for a grant to complete the proposed project described
as a grant to the Lake Johanna Fire Department Headquarters Board, a joint powers entity established
under agreement by the cities of Arden Hills, North Oaks, and Shoreview, for a public safety facility
to house the Lake Johanna Fire Department. This appropriation is to construct, furnish, and equip a
facility on land owned by the Lake Johanna Fire Department Headquarters Board to provide
emergency fire and medical services.
BE IT FURTHER RESOLVED that the Lake Johanna Joint Powers Board has the legal
authority to apply for financial assistance, and the institutional, administrative, and managerial
capability to ensure adequate acquisition, construction, maintenance, and protection of proposed
projectmanagement of contracts for space needs assessment and design contractors and vendors.
BE IT FURTHER RESOLVED that the project cost is estimated for:
Construction (including contingency) $13,619,069
Furnishing and Equipment $2,762,100
Total $16,381,169
BE IT FURTHER RESOLVED Board will provide any required matching funds in addition
to the State grant and that the source of Board’s matching funds shall be from the cities of Arden
Hills, North Oaks, and Shoreview, and will not include other State funding sources in the following
prorated percentages based on the 2025 cost share formula and may be adjusted in 2026 as outlined
in the Joint Powers Agreement:
Arden Hills 24.2%
North Oaks 14.3%
Shoreview 61.5%
BE IT FURTHER RESOLVED the Board hereby pledges to complete the project or
phase if it exceeds the total funding provided by the proposed $6,370,000 grant from the Minnesota
Department of Public Safety.
2
BE IT FURTHER RESOLVED that the City of Arden Hills has the financial capability to
provide any required matching funds and that the source of City’s matching funds shall be
$2,422,703 allocated from the Fire Station #1 Capital Improvement fund, and will not include other
State funding sources.
BE IT FURTHER RESOLVED that the Board has not incurred any reimbursable
expenses prior to the effective date of the agreement.
BE IT FURTHER RESOLVED that the Board has not violated any Federal, State, or local
laws pertaining to fraud, bribery, graft, kickbacks, collusion, conflict of interest or other unlawful or
corrupt practice.
BE IT FURTHER RESOLVED that upon approval of its application by the state, the Board
may enter into an agreement with the State of Minnesota for the above referenced project, and that
the Board certifies that it will comply with all applicable laws and regulations as stated in the contract
agreement.
NOW, THEREFORE BE IT RESOLVED that the Arden Hills member of the Lake
Johanna Fire Department Board of Directors and the Lake Johanna Fire Department Headquarters
JPA is hereby authorized to execute such agreements as are necessary to implement the project on
behalf of the City of Arden Hills.
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS
THIS 10TH DAY OF MARCH 2025.
______________________________
David Grant, Mayor
ATTEST:
Julie Hanson, City Clerk
To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting
cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage.
1
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2025-024
RESOLUTION FOR MINNESOTA DEPARTMENT OF PUBLIC
SAFETY GRANT FUNDING ASSISTANCE FOR LAKE JOHANNA
FIRE DEPARTMENT PROJECT
BE IT RESOLVED that under the provisions contained in Minnesota Laws of 2023 Regular
Session, Article 1, Section 9, Subdivision 14, the State of Minnesota has allocated $6,370,000.00 to
Lake Johanna Joint Powers Board (“Board”) for a grant to complete the proposed project described
as a grant to the Lake Johanna Fire Department Headquarters Board, a joint powers entity established
under agreement by the cities of Arden Hills, North Oaks, and Shoreview, for a public safety facility
to house the Lake Johanna Fire Department. This appropriation is to construct, furnish, and equip a
facility on land owned by the Lake Johanna Fire Department Headquarters Board to provide
emergency fire and medical services.
BE IT FURTHER RESOLVED that the Lake Johanna Joint Powers Board has the legal
authority to apply for financial assistance, and the institutional, administrative, and managerial
capability to ensure adequate acquisition, construction, maintenance, and protection of proposed
project.
BE IT FURTHER RESOLVED that the project cost is estimated for:
Construction (including contingency) $13,619,069
Furnishing and Equipment $2,762,100
Total $16,381,169
BE IT FURTHER RESOLVED Board will provide any required matching funds in addition
to the State grant and that the source of Board’s matching funds shall be from the cities of Arden
Hills, North Oaks, and Shoreview, and will not include other State funding sources in the following
prorated percentages based on the 2025 cost share formula and may be adjusted in 2026 as outlined
in the Joint Powers Agreement:
Arden Hills 24.2%
North Oaks 14.3%
Shoreview 61.5%
BE IT FURTHER RESOLVED the Board hereby pledges to complete the project or
phase if it exceeds the total funding provided by the proposed $6,370,000 grant from the Minnesota
Department of Public Safety.
2
BE IT FURTHER RESOLVED that the City of Arden Hills has the financial capability to
provide any required matching funds and that the source of City’s matching funds shall be
$2,422,703 allocated from the Fire Station #1 Capital Improvement fund, and will not include other
State funding sources.
BE IT FURTHER RESOLVED that the Board has not incurred any reimbursable
expenses prior to the effective date of the agreement.
BE IT FURTHER RESOLVED that the Board has not violated any Federal, State, or local
laws pertaining to fraud, bribery, graft, kickbacks, collusion, conflict of interest or other unlawful or
corrupt practice.
BE IT FURTHER RESOLVED that upon approval of its application by the state, the Board
may enter into an agreement with the State of Minnesota for the above referenced project, and that
the Board certifies that it will comply with all applicable laws and regulations as stated in the contract
agreement.
NOW, THEREFORE BE IT RESOLVED that the Arden Hills member of the Lake
Johanna Fire Department Board of Directors and the Lake Johanna Fire Department Headquarters
JPA is hereby authorized to execute such agreements as are necessary to implement the project on
behalf of the City of Arden Hills.
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS
THIS 10TH DAY OF MARCH 2025.
______________________________
David Grant, Mayor
ATTEST:
Julie Hanson, City Clerk
To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting
cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage.
Page 1 of 2
CONSENT ITEM – 8G
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Elena Fransen, Senior Planner
SUBJECT: Planning Case #24-018 – Trident Development Final Plat Recording Extension
Request
Council Should Consider
Motions to approve, table, or deny the following:
• A 92-day extension until June 13, 2025 for recording of Final Plat for Trident
Development based on the City Council approval of Planning Case 24-018 on January
13, 2025.
Background
On January 13, 2025, the City Council approved a Master and Final Planned Unit Development,
Final Plat, Site Plan Review, Conditional Use Permit and Easement Vacation for Trident
Development (“Developer”) at 1700 Highway 96 W. The project was approved with 33
conditions. The project would subdivide the property into two conforming lots, to facilitate
construction of a 162,819 square foot, 119-unit multiple family dwelling on an approximately
41.10-acre property, and construct additional parking for the existing house of worship. One of
the conditions of approval requires the Applicant to enter into a Development Agreement prior to
the release of the Final Plat for recording.
The Final Plat approval requires that the owner or subdivider shall file with the city administrator
seven (7) copies of the final plat not later than three (3) months after the date of approval of the
preliminary plan; otherwise, the preliminary plan and final plat shall be considered void unless an
extension is requested in writing by the subdivider and for good cause granted by the City Council.
The Developer has submitted a 92-day extension request in writing for the City Council to consider
(Attachment A) until June 13, 2025 to file the Final Plat with Ramsey County.
Options and Motion Language
Staff has provided the following motion language for this case.
Page 2 of 2
1. Approval: Motion to approve the 92-day Final Plat Recording Extension for Trident
Development based on the City Council approval of Planning Case 24-018 on January 13,
2025.
2. Denial: Motion to deny the 92-day Final Plat Recording Extension for Trident Development
based on the City Council approval of Planning Case 24-018 on January 13, 2025: the City
Council should identify findings to deny should specifically reference the reasons for denial
and why those reasons cannot be mitigated.
3. Table: Motion to table the 92-day Final Plat Recording Extension for Trident Development
based on the City Council approval of Planning Case 24-018 on January 13, 2025.
Budget Impact
N/A
Attachments
A. Final Plat Recording Extension Request
Page 1 of 2
CONSENT ITEM – 8H
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Elena Fransen, Senior Planner
SUBJECT: Planning Case #24-016– JJ & CBM Investments, LLC Planned Unit Development
Amendment, 3776 Connelly Avenue
Council Should Consider
Motions to approve, table, or deny the following:
• Amended Planned Unit Development Agreement for JJ & CBM Investments, LLC based
on the City Council approval of Planning Case 24-016 on October 28, 2024.
Background
The City Council approved a Master and Final Planned Unit Development, Site Plan Review, and
Conditional Use Permit for Rose Kukwa (“Applicant”), dba JJ & CBM Investments, LLC
(“Developer”) at 3776 Connelly Avenue on July 22, 2024, for the redevelopment of the existing
11,000 square foot commercial building as an event center and restaurant subject to the 33
conditions.
The Applicant submitted a land use application for a Planned Unit Development Amendment,
proposing additional flexibility from exterior building materials. On October 28, 2024, the City
Council approved a Planned Unit Development Amendment with four conditions. These changes
require an Amendment to the Development Agreement between the City and the Developer. The
City Attorney has prepared the Agreement and the document has been reviewed and approved by
the Applicant and staff (Attachment A).
Options and Motion Language
Staff has provided the following motion language for this case.
1. Approval: Motion to approve the Amended Development Agreement for JJ & CBM
Investments, LLC based on the City Council approval of Planning Case 24-016 on October 28,
2024.
Page 2 of 2
2. Denial: Motion to deny the Amended Development Agreement for JJ & CBM Investments,
LLC based on the City Council approval of Planning Case 24-016 on October 28, 2024: the
City Council should identify findings to deny should specifically reference the reasons for
denial and why those reasons cannot be mitigated.
3. Table: Motion to table the Amended Development Agreement for JJ & CBM Investments,
LLC based on the City Council approval of Planning Case 24-016 on October 28, 2024.
Budget Impact
N/A
Attachments
A. Amended Development Agreement
1
(reserved for recording information)
FIRST AMENDMENT TO
MASTER PLANNED UNIT DEVELOPMENT
AGREEMENT AND
PHASE I AND II – FINAL PLANNED UNIT
DEVELOPMENT PLAN
(Developer Installed Improvements)
ELEGANT EVENT CENTER DEVELOPMENT
(PC24-014)
THIS FIRST AMENDMENT TO MASTER PLANNED UNIT DEVELOPMENT
AGREEMENT AND PHASE I AND II – FINAL PLANNED UNIT DEVELOPMENT PLAN
(“Amendment”) is dated ____________________, 2025, and is by and between the CITY OF
ARDEN HILLS, a Minnesota municipal corporation (“City”), and JJ & CBM Investments, LLC
(the “Developer”).
RECITALS
A. The City and Developer previously entered into a Master Planned Unit Development
Agreement and Please I and II – Final Planned Unit Development Plan dated September
2
23, 2024 and recorded ___________, 2025 as Ramsey County Document No.
_________________ (“Development Agreement/PUD”).
B. The Developer is the fee owner of the property legally described on the attached Exhibit
A (“Property”).
C. Developer has requested an amendment to the Development Agreement/PUD regarding
exterior finishes and materials and has requested flexibility for such.
D. Pursuant to Paragraph 22D of the Development Agreement/PUD, any amendment to the
Development Agreement/PUD must be in writing, signed by the parties and approved by
written resolution of the City Council.
E. The City Council has reviewed and approve the proposed application submitted by the
Developer.
NOW THEREFORE, in consideration of the premises and the mutual obligations of the parties
hereto, the parties agree as follows:
1. The City hereby grants approval to the Developer’s request for an amendment to the
Development Agreement/PUD subject to the following conditions:
• The Conditions of Approval in Paragraph 2B be modified to reference the
conditions listed in Resolution No. 2024-050 Approving a Planned Unit
Development Amendment dated October 28, 2024; and
• The Conditions of Approval in Paragraph 2C be modified to reference the
amendments included in Resolution No. 2024-050 Approving a Planned
Unit Development Amendment dated October 28, 2024.
2. The City hereby approves the additional Development Agreement/PUD Amendments as
outlined in the Recitals above.
3. Developer shall comply with all applicable conditions of the original Development
Agreement/PUD.
3
4. Except as otherwise specifically amended herein, the Development Agreement/PUD shall
remain in full force and effect. This Amendment shall be binding on the parties, their
successors, and assigns, and shall be recorded against the Property in the office of the
Ramsey County Recorder as promptly as possible after it has been executed by the
parties.
IN WITNESS WHEREOF, the parties have caused this Amendment to be executed this ____
day of March, 2025.
[Signatures on the following pages.]
4
Signature page to FIRST AMEDMENT to Development Amendment
Elegant Event Center
CITY OF ARDEN HILLS
By: _____________________________________
David Grant, Mayor
(SEAL)
By: _____________________________________
Jessica Jagoe
Its City Administrator
STATE OF MINNESOTA )
) ss.
COUNTY OF RAMSEY )
The foregoing instrument was acknowledged before me this ________ day of
__________________, 2025, by David Grant and by Jessica Jagoe, respectively, the Mayor and
City Administrator of the City of Arden Hills, a Minnesota municipal corporation, on behalf of
the corporation and pursuant to the authority granted by its City Council.
______________________________________________
Notary Public
5
Signature page to FIRST AMEDMENT TO Development Agreement
Elegant Event Center
DEVELOPER:
JJ & CBM Investments, LLC
By:_______________________________________
_____________________________[print name]
Its: ___________________________
STATE OF ___________ )
) ss.
COUNTY OF ___________ )
The foregoing instrument was acknowledged before me this _________ day of
___________________, 2025, by __________________, the ____________ of JJ & CBM
Investments, LLC.
______________________________________________
Notary Public
DRAFTED BY:
LEVANDER, GILLEN & MILLER
Professional Association
1305 Corporate Center Drive, Suite 300
Eagan, Minnesota 55121
Telephone: (651) 451-1831
6
MORTGAGE HOLDER CONSENT
TO FIRST AMENDMENT TO
DEVELOPMENT AGREEMENT
Hiawatha National Bank, which holds two (2) mortgages on the subject property, the
development of which is governed by the foregoing Development Agreement, which:
the first mortgage is dated December 27, 2024 and recorded December 31, 2024 with the
Ramsey County Recorder/Registrar as document number A5050799;
the second mortgage is dated December 27, 2024 and recorded December 31, 2024 with
the Ramsey County Recorder/Registrar as document number A5050802;
agrees that the Development Agreement shall remain in full force and effect even if it forecloses
on its mortgages.
Dated this _____ day of ____________, 2025.
______________________________________
By: __________________________________
Its:
STATE OF ___________ )
) ss.
COUNTY OF ___________ )
The foregoing instrument was acknowledged before me this _____ day of ___________,
2025, by ______________________________, the ________________________ of Hiawatha
National Bank, a _______________________, on behalf of the entity.
________________________________________
Notary Public
My Commission expires: ___________________
DRAFTED BY:
LEVANDER, GILLEN & MILLER
Professional Association
1305 Corporate Center Drive, Suite 300
Eagan, Minnesota 55121
Telephone: (651) 451-1831
7
EXHIBIT A
TO
DEVELOPMENT AGREEMENT
Legal Description
All that part of the Southwest Quarter of the Southeast Quarter of Section 27, Township 30,
Range 23 lying West of the Easterly 832 feet thereof, and lying South of the Southerly line of the
Minneapolis, St. Paul and Sault Ste. Marie Railroad Company’s Right of Way, and lying East of
the Easterly Right of Way line of Trunk Highway No. 51, and lying Northerly of a line described
as follows: Beginning at a point on the West line of the East 482 feet of said Southwest Quarter
of the Southeast Quarter which is 344 feet North of the South line of said Southwest Quarter of
the Southeast Quarter; thence running Northwesterly to a point which is located as follows:
Beginning at a point on said South line of Southwest Quarter of the Southeast Quarter distant
132 feet East of the Southwest corner of said Southwest Quarter of Southeast Quarter; thence
running Northerly at an angle of 90 degrees 16 minutes with said South line (as measured from
East to North) a distance of 455.1 feet; thence Easterly at right angles 110 feet to the point which
is the terminus of the line being described. Ramsey County, Minnesota.
Abstract Property
Page 1 of 1
CONSENT ITEM – 8I
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Julie Hanson, Assistant to the City Administrator/City Clerk
SUBJECT: Resolution Appointing Planning Commission Members
Budgeted Amount: Actual Amount: Funding Source:
$ $ $
Council Should Consider
• Resolution 2025-030 Appointing Nancy Jacobson and Jessica Birken as Regular Planning
Commission Members and Donna Wiemann as an Alternate Planning Commission
Member.
Background/Discussion
The Planning Commission has two openings for Regular Commissioners and one opening for an
Alternate. Following completion of interviews of 7 applicants, it is the recommendation of
Council Liaison Weber, Chair Collins, and Staff Liaison City Administrator Jagoe that Council
appoint the following individuals to the Planning Commission with terms ending December 31,
2027:
• Nancy Jacobson
• Jessica Birken
• Donna Wiemann – Alternate
Attachment
A: Resolution 2025-030
To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting
cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage.
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2025-030
A RESOLUTION APPOINTING MEMBERS TO THE PLANNING COMMISSION
WHEREAS, the City Council appoints residents to serve in an advisory capacity to the
City Council regarding planning and zoning issues; and
WHEREAS, the Planning Commission currently has two openings for Regular Planning
Commission members and one opening for an Alternate.
THEREFORE, BE IT RESOLVED that the Arden Hills City Council appoints the
following individuals to the Planning Commission with terms expiring December 31, 2027:
• Nancy Jacobson
• Jessica Birken
• Donna Wiemann - Alternate
ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 10TH
DAY OF MARCH 2025.
_________________________________________
David Grant, Mayor
ATTEST:
_______________________________________
Julie Hanson, City Clerk
Page 1 of 3
CONSENT ITEM - 8J
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: David Swearingen, P.E. Public Works Director / City Engineer
SUBJECT: 2026 PMP Street & Utility Improvements Project – Feasibility Report and
Professional Services
Budgeted Amount: Actual Amount: Funding Source:
$2,585,000 (CIP) TBD through feasibility study PIR, Special Assessments,
Utility Funds, RCWD Grant
Council Should Consider
Motions to approve, table, or deny the following:
• Resolution 2025-025, Ordering Preparation of the Feasibility Report for the 2026
PMP Street & Utility Improvements Project.
• Accepting the proposal from Bolton & Menk in the amount not-to-exceed of
$439,813 for the Feasibility Report, Design of plans and specifications, and
construction administration of the 2026 PMP Street & Utility Improvements Project.
• Geotechnical/pavement evaluation and environmental services with Braun Intertec
Corporation for the Base Scope of Services in the amount of $34,725.
• Special benefit appraisal services proposal with Nagell Appraisal & Consulting in the
amount of $1,600.
Background/Discussion
The 2025-2029 Capital Improvement Program (CIP), identifies proposed street and utility
improvements within the Karth Lake neighborhood area for 2026, the proposed project area can
be seen in Attachment A. The proposed streets include Karth Lake Dr., Pleasant Drive (between
south and north cul-de-sacs), Pleasant Dr. (Amble Dr. to south cul-de-sac), Pleasant Circle,
Amble Drive (Karth Lake Dr to Lexington Avenue), Karth Lake Circle, and Cummings Park
Drive, which includes approximately 132 properties adjacent to the street improvements.
The City Council Work Session on February 10, 2025, included discussion of the anticipated
scope of work, schedule and an initial estimate of costs for potential improvements within the
Page 2 of 3
project area. Based on the discussion, Council was in favor to proceed with the project into the
feasibility study phase. This will include a geotechnical evaluation, topographic survey of the
corridor, an analysis of the existing sewer and water systems, preliminary design of the street and
drainage improvements, public engagement, cost estimate, benefit appraisals and proposed
assessments. The final Feasibility Report will be shared with Council at a later Work Session, the
full anticipated scheduled can be seen below in this memo. Staff recommends approving
Resolution 2025-025, Attachment B, to move ahead with preparation of the Feasibility Report
for the 2026 PMP.
Also, at the City Council Work Session on February 10, 2025, Council authorized staff to direct
select Bolton & Menk to provide a proposal for professional services to include the feasibility
report, design of plans and specifications, and construction administration. Since then, staff has
received the proposal (Attachment C) and negotiated with the consultant to ensure the City will
be receiving a quality project at a competitive cost. Bolton & Menk has been the engineering
consultant on the 2021 PMP, the Old Snelling Street and Trail Improvement project (2022 PMP),
and the 2024 PMP. These projects were very successful and overall City staff received positive
feedback from residents involved. City staff has become familiar with Bolton & Menk’s team
and Bolton & Menk is familiar with the City’s PMP project process and Assessment Policy. The
Bolton & Menk proposal provided a clear and organized approach, a detailed project delivery
schedule, and sufficient hours to complete a quality project and properly administer public
engagement. Staff recommends accepting the proposal from Bolton & Menk in the amount not-
to-exceed $439,813.
During the feasibility study phase, a geotechnical evaluation is necessary to support the proposed
improvements. Braun Intertec has provided a proposal with a fee not-to-exceed $34,725. City
staff recommends approving the proposal.
Also, during the feasibility study phase, property benefit appraisals will be conducted to support
the special assessment rate. Nagell Appraisal & Consulting has provided a proposal in the
amount of $1,600. Staff recommends approving the proposal.
Preliminary Project Schedule
The following is a preliminary project delivery schedule for the 2026 PMP project. A refined
project schedule will be provided within the feasibility report.
Resolution Ordering a Feasibility Report
March 10, 2025
Approve Engineering Professional Services March 10, 2025
Informational Meeting/Open House #1 May 28, 2025
Work Session Discussion June 9, 2025
Accept Feasibility Report, Call for Hearing June 23, 2025
Improvement Hearing, Order Plans & Specs July 14, 2025
Work Session Discussion October 13, 2025
Informational Meeting/Open House #2 November 5, 2025
Work Session Discussion (if-needed) December 8, 2025
Approve Plans, Advertisement for Bids January 12, 2026
Call for Assessment Hearing February 9, 2026
Assessment Hearing March 9, 2026
Accept Bids and Award Construction Contract March 9, 2026
Start Construction April 20, 2026
Construction Final Completion November 15, 2026
Page 3 of 3
Budget Impact
The 2025-2029 Capital Improvement Plan identifies the 2026 PMP Street & Utility
Improvements Project with a budget of $2,585,000 with project funding sources consisting of the
PIR fund, special assessments, sanitary sewer utility, water utility, surface water utility and the
Rice Creek Watershed District Grant for surface water improvements.
City staff will be pursuing funding through the Rice Creek Watershed District Stormwater
Management Grant Program and will coordinate with Ramsey County if there is an opportunity
for cost-share-related pond improvements.
The total project cost estimate and proposed project funding sources will be further refined
during preparation of the feasibility report.
Funding Sources Budgeted Amount
PIR $860,000
Special Assessments $860,000
Sanitary Sewer $145,000
Surface Water $500,000
Water $120,000
RCWD Grant (surface water)$100,000
Total:$2,585,000
The proposal provided by Bolton & Menk includes fees not-to-exceed $439,813 for professional
services for the entire project through feasibility report, design and specifications and
construction administration. If approved, Bolton & Menk will proceed with the feasibility study
phase. Once complete, Council will review the Final Feasibility Report at a Work Session, then
at a regular Council Meeting will choose to Accept the Feasibility Report and Call for an
Improvement Hearing (Public Hearing). After the Improvement Hearing, Council will choose to
Order Plans and Specifications and Bolton & Menk will continue with the project according to
the Professional Services Agreement.
Attachments
Attachment A: Project Corridor Map
Attachment B: Resolution 2025-025
Attachment C: Proposal from Bolton & Menk
Attachment D: Proposal from Braun Intertec Corporation
Attachment E: Proposal from Nagell Appraisal & Consulting
To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting
cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage.
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2025-025
RESOLUTION ORDERING THE PREPARATION OF FEASIBILITY REPORT FOR
THE 2026 PMP STREET & UTILITY IMPROVEMENTS PROJECT
WHEREAS, the Capital Improvement Program for the City of Arden Hills identifies
potential street and utility improvements; and
WHEREAS, it is proposed to improve the following streets:
Karth Lake Dr.;
Pleasant Drive (between south and north cul-de-sacs);
Pleasant Dr. (Amble Dr. to south cul-de-sac);
Pleasant Circle;
Amble Drive (Karth Lake Dr to Lexington Avenue);
Karth Lake Circle;
Cummings Park Drive;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
ARDEN HILLS MINNESOTA:
That the proposed improvement stated above shall be referred to as the 2026 PMP
(Pavement Management Program) Street & Utility Improvements Project for study and that
the Public Works Director/City Engineer is instructed to report to the Council with all
convenient speed advising the Council in a preliminary way as to whether the proposed
improvement is necessary, cost-effective, and feasible and as to whether it should best be
made as proposed or in connection with some other improvement, and the estimated cost of
the improvement as recommended.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS
THIS 10TH DAY OF MARCH, 2025.
_____________________________________
David Grant, Mayor
ATTEST:
______________________________________
Julie Hanson, City Clerk
Public Standard Form – MN Page 1 of 9
V202404
AGREEMENT FOR PROFESSIONAL SERVICES MN
2026 PMP STREET & UTILITY IMPROVEMENTS
CITY OF ARDEN HILLS, MN and BOLTON & MENK, INC.
This Agreement, made this 10th day of March, 2025, by and between CITY OF ARDEN HILLS, 1245 W. Highway 96,
Arden Hills, MN 55112, (“CLIENT”), and BOLTON & MENK, INC., 12224 Nicollet Avenue, Burnsville, MN 55337,
(“CONSULTANT”).
WITNESS, whereas the CLIENT requires professional services in conjunction with 2026 PMP STREET AND UTILITY
IMPROVEMENTS (“Project”) and whereas the CONSULTANT agrees to furnish the various professional services (the
“Services”), including Basic Services and Additional Services as defined in Section I, as requested by the CLIENT.
NOW, THEREFORE, in consideration of the mutual covenants and promises between the parties hereto, it is agreed:
SECTION I – CONSULTANT’S SERVICES
A. The CONSULTANT agrees to perform the various Basic Services in connection with the Project as described in
Exhibit A.
B. Upon mutual agreement of the parties, professional services in addition to the Basic Services (the “Additional
Services”) may be authorized as described in Paragraph IV.B, and when so authorized, shall be included with the
Services to be provided under this Agreement.
SECTION II - THE CLIENT'S RESPONSIBILITIES
A. The CLIENT shall promptly compensate the CONSULTANT for the Services in accordance with Section III of this
Agreement.
B. The CLIENT shall place any and all previously acquired information related to the Project in its custody at the
disposal of the CONSULTANT for its use. Such information shall include , but is not limited to: boundary surveys,
topographic surveys, preliminary sketch plan layouts, building plans, soil surveys, abstracts, deed descriptions, tile
maps and layouts, aerial photos, utility agreements, environmental reviews, and zoning limitations. The
CONSULTANT may rely upon the accuracy and sufficiency of all such information in performing services unless
otherwise instructed, in writing, by CLIENT.
C. The CLIENT will guarantee access to and make all provisions for entry upon public portions of the project and
reasonable efforts to provide access to private portions and pertinent adjoining properties.
D. The CLIENT will give prompt notice to the CONSULTANT whenever the CLIENT observes or otherwise becomes
aware of any defect in the proposed project.
E. The CLIENT shall designate a liaison person to act as the CLIENT'S representative with respect to services to be
rendered under this Agreement. Said representative shall have the authority to transmit instructions, receive
instructions, receive information, interpret and define the CLIENT'S policies with respect to the project and
CONSULTANT'S services.
Public Standard Form – MN Page 2 of 9
V202404
F. The CONSULTANT’S services do not include legal, insurance counseling, accounting, independent cost
estimating, financial advisory or “municipal advisor” (as described in Section 975 of the Dodd-Frank Wall Street
Reform and Consumer Protection Act 2010 and the municipal advisor registration rules issued by the SEC)
professional services and the CLIENT shall provide any such services as may be required for completion of the Project
described in this Agreement.
G. The CLIENT will obtain any and all regulatory permits required for the proper and legal execution of the Project.
CONSULTANT will assist CLIENT with permit preparation and documentation to the extent described in Exhibit I.
H. The CLIENT may hire, at its discretion, when requested by the CONSULTANT, an independent test company to
perform laboratory and material testing services, and soil investigation that can be justified for the proper design
and construction of the Project. The CONSULTANT shall assist the CLIENT in selecting a testing company. Payment
for testing services shall be made directly to the testing company by the CLIENT and is not part of this Agreement.
If CLIENT elects not to hire an independent test co mpany, CLIENT shall provide CONSULTANT with guidance and
direction on completing those aspects of design and construction that require additional testing data.
SECTION III - COMPENSATION FOR SERVICES
A. FEES.
1. The CLIENT will compensate the CONSULTANT in accordance with Schedule of Fees for the time spent by
CONSULTANT’S personnel in performance of the Services. Total fees for the Services shall not exceed
$439,813.00 without the prior consent of CLIENT. See the attached Schedule 1 for Schedule of Fees applicable
to this Agreement.
2. The preceding Schedule of Fees shall apply for services provided through December 31, 2025. Hourly rates may
be adjusted by CONSULTANT, in consultation with CLIENT, on an annual basis thereafter to reflect reasonable
changes in its operating costs and other market factors. Adjusted rates will become effective on January 1st of
each subsequent year, upon written acceptance by CLIENT.
3. Rates and charges do not include sales tax. If such taxes are imposed and become applicable after the date of
this Agreement CLIENT agrees to pay any applicable sales taxes.
4. The rates in the Schedule of Fees include labor, general business and other normal and customary expenses
associated with operating a professional business. Unless otherwise agreed in writing, the above rates include
vehicle and personal expenses, mileage, telephone, survey stakes and routine expendable supplies; and no
separate charges will be made for these activities and materials.
5. Additional Services as outlined in Section I.B will vary depending upon project conditions and will be billed on
an hourly basis at the rate described in Section III.A.1.
6. Expenses required to complete the agreed scope of services or identified in this paragraph will be invoiced
separately, and include but are not limited to large quantities of prints; extra report copies; out-sourced graphics
and photographic reproductions; document recording fees; special field and traffic control equipment rental;
outside professional and technical assistance; geotechnical services; and other items of this general nature
required by the CONSULTANT to fulfill the terms of this Agreement. CONSULTANT shall be reimbursed at cost
plus an overhead fee (not-to-exceed 10%) for these Direct Expenses incurred in the performance of the work
subject to the Total cost not to exceed fee or approved Additional Services.
Public Standard Form – MN Page 3 of 9
V202404
B. PAYMENTS AND RECORDS.
1. The payment to the CONSULTANT will be made by the CLIENT upon billing at intervals not more often than
monthly at the herein rates and terms.
2. If CLIENT fails to make any payment due CONSULTANT for Services and expenses within 45 days after date of
the CONSULTANT'S invoice, a service charge of one and one-half percent (1.5%) per month or the maximum
rate permitted by law, whichever is less, will be charged on any unpaid balance.
3. In addition to the service charges described in preceding paragraph, if the CLIENT fails to make payment for
Services and expenses within 60 days after the date of the invoice, the CONSULTANT may, upon giving seven
days' written notice to CLIENT, suspend Services and withhold project deliverables due under this Agreement
until CONSULTANT has been paid in full for all past due amounts for Services, expenses and charges, without
waiving any claim or right against the CLIENT and without incurring liability whatsoever to the CLIENT.
4. Documents Retention. The CONSULTANT will maintain records that reflect all revenues, costs incurred and the
Services provided in the performance of the Agreement. The CONSULTANT will also agree that the CLIENT, State,
or their duly authorized representatives may, at any time during normal business hours and as often as
reasonably necessary, have access to and the right to examine, audit, excerpt, and transcribe any books,
documents, papers, records, etc., and accounting procedures and practices of the CONSU LTANT which are
relevant to this Contract for a period of six years.
SECTION IV – GENERAL
A. STANDARD OF CARE. Professional services provided under this Agreement will be conducted in a manner
consistent with that level of care and skill ordinarily exercised by members of the CONSULTANT’S profession
currently practicing under similar conditions. No warranty, express or implied, is made.
B. CHANGE IN PROJECT SCOPE. In the event the CLIENT changes or is required to change the scope or duration of
the Project from that described in Exhibit I, and such changes require Additional Services by the CONSULTANT, the
CONSULTANT shall be entitled to additional compensation at the applicable hourly rates. To the fullest extent
practical, the CONSULTANT shall give notice to the CLIENT of any Additional Services, prior to furnishing such
Additional Services. The CONSULTANT shall furnish an estimate of additional cost, prior to authorization of the
changed scope of work and this Agreement will be revised in writing.
C. LIMITATION OF LIABILITY
1. Liability of CONSULTANT. CONSULTANT shall indemnify CLIENT from losses, damages, and judgments arising
from third-party claims or actions relating to the Project only to the extent caused by the negligent acts, errors
or omissions (whether in the performance of professional services or otherwise) of CONSULTANT or
CONSULTANT’S officers, employees, or subconsultants occurring during the scope of CONSULTANT’s work on
the Project and provided that any such claim, action, loss, damages, or judgment is attributable to bodily injury,
sickness, disease, or death, or to injury to or destruction of tangible property. CONSULTANT’s obligation to
indemnify the CLIENT and CLIENT’s officers and employees harmless does not include a duty to defend . This
indemnification shall not apply to third-party claims or actions for consequential damages, lost revenues,
increased expense, or lost profits, nor to any claim for punitive or exemplary damages .
2. Liability of Client. To the fullest extent permitted by law and subject to the maximum limits of liability set forth
in Minnesota Statutes Section 466.04, CLIENT shall indemnify CONSULTANT from losses, damages, and
Public Standard Form – MN Page 4 of 9
V202404
judgments (including reasonable attorneys’ fees and expenses of litigation) arising from claims or actions
relating to the Project, provided that any such claim, action, loss, damages, or judgment is attributable to bodily
injury, sickness, disease, or death, or to injury to or destruction of tangible property, but only to the extent
caused by the acts or omission of CLIENT or CLIENT’S employees, agents, or other consultants. This
indemnification shall not apply to third-party claims or actions for consequential damages, lost revenues,
increased expense or lost profits, nor to any claim for punitive or exemplary damages .
3. To the fullest extent permitted by law, CLIENT and CONSULTANT waive against each other, and the other’s
employees, officers, directors, members, agents, insurers, partners, and consultants, any and all claims for or
entitlement to special, incidental, indirect, or consequential damages arising out of, resulting from, or in any
way related to this Agreement, from any cause or causes. CLIENT waives all claims against individuals involved
in the services provided under this Agreement and agrees to limit all claims to the CONSULTANT’s corporate
entity.
4. Nothing contained in this Agreement shall create a contractual relationship with or a cause of action in favor of
a third party against either the CLIENT or the CONSULTANT. The CONSULTANT'S services under this Agreement
are being performed solely for the CLIENT'S benefit, and no other entity shall have any claim against the
CONSULTANT because of this Agreement or the performance or nonperformance of services provided
hereunder.
D. INSURANCE
1. The CONSULTANT agrees to maintain, at CONSULTANT’S expense a commercial general liability (CGL) and excess
or umbrella general liability insurance policy or policies insuring CONSULTANT against claims for bodily injury,
death or property damage arising out of CONSULTANT’S general business activities. The general liability
coverage shall provide limits of not less than $2,000,000 per occurrence and not less than $2,000,000 general
aggregate. Coverage shall include Premises and Operations Bodily Injury and Property Damage; Personal and
Advertising Injury; Blanket Contractual Liability; Products and Completed Operations Liability.
2. The CONSULTANT also agrees to maintain, at CONSULTANT’S expense, a single limit or combined limit
automobile liability insurance and excess or umbrella liability policy or policies insuring owned, non-owned and
hired vehicles used by CONSULTANT under this Agreement. The automobile liability coverages shall provide
limits of not less than $1,000,000 per accident for property damage, $2,000,000 for bodily injuries, death and
damages to any one person and $2,000,000 for total bodily injury, death and damage claims arising from one
accident.
3. CLIENT shall be named Additional Insured for the above CGL and Auto liability policies, to the extent permitted
by CONSULTANT’S insurers.
4. The CONSULTANT agrees to maintain, at the CONSULTANT'S expense, statutory worker's compensation
coverage together with Coverage B, Employer’s Liability limits of not less than $500,000 for Bodily Injury by
Disease per employee, $500,000.00 for Bodily Injury by Disease aggregate and $500,000 for Bodily Injury by
Accident.
5. The CONSULTANT also agrees to maintain, at CONSULTANT’S expense, Professional Liability Insurance coverage
insuring CONSULTANT against damages for legal liability arising from a negligent act, error or omission in the
performance of professional services required by this Agreement during the period of CONSULTANT’S services
and for three years following date of final completion of its services. The professional liability insurance coverage
shall provide limits of not less than $2,000,000 per claim and an annual aggregate of not less than $2,000,000
on a claims-made basis.
Public Standard Form – MN Page 5 of 9
V202404
6. CLIENT shall maintain statutory Workers Compensation insurance coverage on all of CLIENT’S employees and
other liability insurance coverage for injury and property damage to third parties due to the CLIENT’S negligence.
7. Prior to commencement of this Agreement, CONSULTANT will provide the CLIENT with certificates of insurance,
showing evidence of required coverages. All policies of insurance shall contain a provision or endorsement that
the coverage afforded will not be canceled or reduced in limits by endorsement for any reason except non -
payment of premium, until at least 30 days prior written notice has been given to the Certificate Holder, and at
least 10 days prior written notice in the case of non-payment of premium
E. OPINIONS OR ESTIMATES OF CONSTRUCTION COST. Where provided by the CONSULTANT as part of Exhibit I
or otherwise, opinions or estimates of construction cost will generally be based upon public construction cost
information. Since the CONSULTANT has no control over the cost of labor, materials, compet itive bidding process,
weather conditions and other factors affecting the cost of construction, all cost estimates are opinions for general
information of the CLIENT and the CONSULTANT does not warrant or guarantee the accuracy of construction cost
opinions or estimates. The CLIENT acknowledges that costs for project financing should be based upon contracted
construction costs with appropriate contingencies.
F. CONSTRUCTION SERVICES. It is agreed that the CONSULTANT and its representatives shall not at any time
supervise, direct, control, or have authority over any contractor’s work, nor shall CONSULTANT have authority over
or be responsible for the means, methods, techniques, sequences, or procedures of construction selected or used
by any contractor, or the safety precautions and programs incident thereto, for security or safety at any Project site,
nor for any failure of a Contractor to comply with Laws and Regulations applicable to that Contractor’s furnishing
and performing of its work. CONSULTANT shall not be responsible for the acts or omissions of any Contractor. CLIENT
acknowledges that on-site contractor(s) are solely responsible for construction site safety programs and their
enforcement.
G. USE OF ELECTRONIC/DIGITAL DATA.
1. Because of the potential instability of electronic/digital data and susceptibility to unauthorized changes, copies
of documents that may be relied upon by CLIENT are limited to the printed copies (also known as hard copies)
that are signed or sealed by CONSULTANT. Except for electronic/digital data which is specifically identified as a
project deliverable for this Agreement or except as otherwise explicitly provided in this Agreement, all
electronic/digital data developed by the CONSULTANT as part of the Project is acknowledged to be an internal
working document for the CONSULTANT’S purposes solely and any such information provided to the CLIENT
shall be on an “AS IS” basis strictly for the convenience of the CLIENT without any warranties of any kind. As
such, the CLIENT is advised and acknowledges that use of such information may require substantial modification
and independent verification by the CLIENT (or its designees).
2. Provision of electronic/digital data, whether required by this Agreement or provided as a convenience to the
Client, does not include any license of software or other systems necessary to read, use or reproduce the
information. It is the responsibility of the CLIENT to verify compatibility with its system and long-term stability
of media. CLIENT shall indemnify and hold harmless CONSULTANT and its Subconsultants from all claims,
damages, losses, and expenses, including attorneys' fees arising out of or resulting from third party use or any
adaptation or distribution of electronic/digital data provided under this Agreement, unless such third party use
and adaptation or distribution is explicitly authorized by this Agreement.
Public Standard Form – MN Page 6 of 9
V202404
H. REUSE OF DOCUMENTS
1. Drawings and specifications and all other documents (including electronic and digital versions of any documents)
prepared or furnished by CONSULTANT pursuant to this Agreement are instruments of service in respect to the
Project and CONSULTANT shall retain an ownership interest therein. Upon payment of all fees owed to the
CONSULTANT, the CLIENT shall acquire a limited license in all identified deliverables (including reports, plans,
and specifications) for any reasonable use relative to the Project and the general operations of the CLIENT. Such
limited license to Owner shall not create any rights in third parties.
2. CLIENT may make and disseminate copies for information and reference in connection with the use and
maintenance of the Project by the CLIENT. However, such documents are not intended or represented to be
suitable for reuse by CLIENT or others on extensions of the Project or on any other project. Any reuse by CLIENT
or, any other entity acting under the request or direction of the CLIENT, without written verification or
adaptation by CONSULTANT for such reuse will be at CLIENT'S sole risk and without liability or legal exposure to
CONSULTANT and CLIENT shall indemnify and hold harmless CONSULTANT from all claims, damages, losses and
expenses including attorney's fees arising out of or resulting from such reuse.
I. CONFIDENTIALITY. CONSULTANT agrees to keep confidential and not to disclose to any person or entity, other
than CONSULTANT’S employees and subconsultants any information related to the Project obtained from CLIENT
not previously in the public domain or not otherwise previously known to or generated by CONSULTANT. These
provisions shall not apply to information in whatever form that comes into the public domain through no fault of
CONSULTANT; or is furnished to CONSULTANT by a third party who is under no obligation to keep such information
confidential; or is information for which the CONSULTANT is required to provide by law or authority with proper
jurisdiction; or is information upon which the CONSULTANT must rely for defense of any claim or legal action.
J. PERIOD OF AGREEMENT. This Agreement will remain in effect for the longer of a period of two (2) years or until
such other expressly identified completion date, after which time the Agreement may be extended upon mutual
agreement of both parties.
K. TERMINATION. This Agreement may be terminated:
1. For cause, by either party upon 7 days written notice in the event of substantial failure by other party to perform
in accordance with the terms of this Agreement through no fault of the terminating party. For termination by
CONSULTANT, cause includes, but is not limited to, failure by CLIENT to pay amounts owed to CONSULTANT
within 120 days of invoice and delay or suspension of CONSULTANT’s services for more than 120 days for
reasons beyond CONSULTANT’S cause or control; or,
2. For convenience by CLIENT upon 7 days written notice to CONSULTANT.
3. Notwithstanding, the foregoing, this Agreement will not terminate under paragraph IV.K if the party receiving
such notice immediately commences correction of any substantial failure and cures the same within 10 days of
receipt of the notice.
4. In the event of termination by CLIENT for convenience or by CONSULTANT for cause, the CLIENT shall be
obligated to the CONSULTANT for payment of amounts due and owing including payment for services performed
or furnished to the date and time of termination , computed in accordance with Section III of this Agreement.
CONSULTANT shall deliver and CLIENT shall have, at its sole risk, right of use of any completed or partially
completed deliverables, subject to provisions of Paragraph IV. H.
Public Standard Form – MN Page 7 of 9
V202404
5. In event of termination by CLIENT for cause and in addition to any other remedies available to CLIENT,
CONSULTANT shall deliver to CLIENT and CLIENT shall have right of use of any completed or partially completed
deliverables, in accordance with the provisions of Paragraph IV.H. CLIENT shall compensate CONSULTANT for
all undisputed amounts owed CONSULTANT as of date of termination.
L. INDEPENDENT CONTRACTOR. Nothing in this Agreement is intended or should be construed in any manner as
creating or establishing the relationship of co-partners between the parties hereto or as constituting the
CONSULTANT or any of its employees as the agent, representative, or employee of the CLIENT for any purpose or in
any manner whatsoever. The CONSULTANT is to be and shall remain an independent contractor with respect to all
services performed under this Agreement.
M. CONTINGENT FEE. The CONSULTANT warrants that it has not employed or retained any company or person,
other than a bona fide employee working solely for the CONSULTANT to solicit or secure this Agreement, and that it
has not paid or agreed to pay any company or person, other than a bona fide employee, any fee, commission,
percentage, brokerage fee, gift or any other consideration, contingent upon or resulting from award or making of
this Agreement.
N. NON-DISCRIMINATION. The provisions of any applicable law or ordinance relating to civil rights and
discrimination shall be considered part of this Agreement as if fully set forth herein. The CONSULTANT is an equal
opportunity employer and federal contractor or subcontractor. Consequently, the parties agree that, as
applicable, they will abide by the requirements of 41 CFR 60-1.4(a), 41 CFR 60-300.5(a) and 41 CFR 60-741.5(a) and
that these laws are incorporated herein by reference. These regulations prohibit discrimination against qualified
individuals based on their status as protected veterans or individuals with disabilities, and prohibit discrimination
against all individuals based on their race, color, religion, sex, sexual orientation, gender identity or national
origin. These regulations require that covered prime contractors and subcontractors take affirmative action to
employ and advance in employment individuals without regard to race, color, religion, sex, sexual orientation,
gender identity, national origin, protected veteran status or disability. The parties also agree that, as applicable,
they will abide by the requirements of Executive Order 13496 (29 CFR Part 471, Appendix A to Subpart A), relating
to the notice of employee rights under federal labor laws.
O. ASSIGNMENT. Neither party shall assign or transfer any interest in this Agreement without the prior written
consent of the other party.
P. SURVIVAL. All obligations, representations and provisions made in or given in Section IV and Documents
Retention clause of this Agreement will survive the completion of all services of the CONSULTANT under this
Agreement or the termination of this Agreement for any reason.
Q. SEVERABILITY. Any provision or part of the Agreement held to be void or unenforceable under any law or
regulation shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon CLIENT
and CONSULTANT, who agree that the Agreement shall be reformed to replace such stricken provision or part
thereof with a valid and enforceable provision that comes as close as possible to expressing the intention of the
stricken provision.
R. CONTROLLING LAW. This Agreement is to be governed by the law of the State of Minnesota and venued in
courts of Minnesota; or at the choice of either party, and if federal jurisdictional requirements are met, in federal
court in the district in which the project is located.
S. DISPUTE RESOLUTION. CLIENT and CONSULTANT agree to negotiate all disputes between them in good faith
for a period of 30 days from the date of notice of dispute prior to proceeding to formal dispute resolution or
exercising their rights under law. Any claims or disputes unres olved after good faith negotiations shall then be
Public Standard Form – MN Page 8 of 9
V202404
submitted to mediation using a neutral from the Minnesota District Court Rule 114 Roster, or if mutually agreed at
time of dispute submittal, a neutral from the American Arbitration Association Construction Industry roster. If
mediation is unsuccessful in resolving the dispute, then either party may seek to have the dispute resolved by
bringing an action in a court of competent jurisdiction.
T. MINNESOTA GOVERNMENT DATA PRACTICES ACT (MGDPA). All data collected, created, received, maintained,
or disseminated, or used for any purposes in the course of the CONSULTANT’S performance of the Agreement is
governed by the Minnesota Government Data Practices Act, Minnesota Statutes Section 13.01, et seq . or any other
applicable state statutes and state rules adopted to implement the Act, as well as state statutes and federal
regulations on data privacy. The Consultant agrees to abide by these statutes, rul es and regulations and as they may
be amended. In the event the CONSULTANT receives a request to release data, it shall notify CLIENT as soon as
practical. The CLIENT will give instructions to CONSULTANT concerning release of data to the requesting party and
CONSULTANT will be reimbursed as additional services for its reasonable labor and other direct expenses in
complying with any MGDPA request, but only to the extent that the request is not due to a negligent, intentional or
willful act or omission by the CONSULTANT or other failure to comply with its obligations under this contract.
[REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK. SIGNATURE PAGE FOLLOWS.]
Public Standard Form – MN Page 9 of 9
V202404
SECTION V - SIGNATURES
THIS INSTRUMENT embodies the whole agreement of the parties, there being no promises, terms, conditions or
obligation referring to the subject matter other than contained herein. This Agreement may only be amended,
supplemented, modified or canceled by a duly executed written instrument signed by both parties.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed in their behalf.
CLIENT: CONSULTANT: Bolton & Menk, Inc.
CLIENT’s Representative with authority for ordering
engineering services and transmitting instructions:
ATTACHMENTS:
- Schedule 1 Schedule of Fees
- Exhibit A Scope of Services
Brad Fisher, Principal Engineer
03/10/2025
Submitted by Bolton & Menk, Inc.
The following fee schedule is based upon
competent, responsible professional services
and is the minimum, below which adequate
professional standards cannot be maintained.
It is, therefore, to the advantage of both
the professional and the client that fees be
commensurate with the service rendered.
Charges are based on hours spent at hourly
rates in effect for the individuals performing
the work. The hourly rates for principals and
members of the staff vary according to skill
and experience. The current specific billing
rate for any individual can be provided upon
request.
The fee schedule shall apply for the period
through December 31, 2025. These rates may
be adjusted annually thereafter to account
for changed labor costs, inflation, or changed
overhead conditions.
These rates include labor, general business,
and other normal and customary expenses
associated with operating a professional
business. For projects with typical expenses
and unless otherwise agreed, the above
rates include vehicle and personal expenses,
mileage, telephone, survey stakes, and
routine expendable supplies; no separate
charges will be made for these activities
and materials. Expenses beyond typical
project expenses, non-routine expenses,
and expenses beyond the agreed scope
of services, such as out of town travel
expenses, long travel distances, large
quantities of prints, extra report copies,
outsourced graphics and photographic
reproductions, document recording fees,
outside professional and technical assistance,
and other items of this general nature will be
invoiced separately. Rates and charges do not
include sales tax, if applicable.1 No separate charges will be made for GPS or robotic total stations on Bolton & Menk, Inc.
survey assignments; the cost of this equipment is included in the rates for survey technicians.
*Specialized role not classified above otherwise.
**Highly specialized and industry expertise unique to the market or area of discipline.
Employee Classification 2025 Hourly
Billing
Graduate Engineer $125-185
Design Engineer $125-196
Project Engineer $145-215
Senior Project Engineer $160-215
Project Manager $135-240
Senior Project Manager $188-273
Architect $186-267
Planner $125-168
Senior Planner $170-228
Landscape Designer $98-196
Landscape Architect $148-176
Senior Landscape Architect $160-268
Survey Technician1 $90-196
Graduate Surveyor $122-190
Licensed Project Surveyor $180-225
Technician $75-182
Senior Technician $125-212
Administrative/Corporate Specialists $68-175
Specialist*$100-230
Practice Expert**$145-363
Principal**$175-316
Senior Principal**$218-333
GPS/Robotic Survey Equipment1 NO CHARGE
CAD/Computer Usage NO CHARGE
Routine Office Supplies NO CHARGE
Routine Photo Copying/Reproduction NO CHARGE
Field Supplies/Survey Stakes & Equipment NO CHARGE
Mileage NO CHARGE
2025 SCHEDULE OF FEES
SCHEDULE 1
12224 Nicollet Avenue
Burnsville, MN 55337
952-890-0509 | Bolton-Menk.com
Contact:
Brad Fisher, PE
612-759-7240
bradley.fisher@bolton-menk.com
WE BELIEVE ALL PEOPLE SHOULD LIVE IN SAFE, SUSTAINABLE, AND BEAUTIFUL COMMUNITIES.
FEBRUARY 26, 2025
2026 PMP STREET AND
UTILITY IMPROVEMENTS
EXHIBIT A
12224 Nicollet Avenue
Burnsville, MN 55337
952-890-0509 | Bolton-Menk.com
BOLTON & MENK IS AN EQUAL OPPORTUNITY EMPLOYER.
Dear David,
The City of Arden Hills has initiated the 2026 PMP Street and Utility Improvements
project with the goal to rehabilitate various local streets and select trail segments, make
improvements to select utilities, and clean sediment out of the various Karth Lake deltas
located in the east-northeast portion of the city. This project will require a detailed analysis
of the project area with technical design expertise to ensure the right solutions are
developed into plans and specifications in an efficient manner. Like you, Bolton & Menk,
Inc. takes great pride in designing and managing projects that are safe, sustainable, and
functional. We understand what needs to be accomplished for the successful completion of
the 2026 PMP Street and Utility Improvements project.
TECHNICAL LEADERSHIP – This project requires a range of services, from topographic
survey through construction — the city needs a consultant with the experience and expertise
to manage them all. Bolton & Menk has successfully completed dozens of street and utility
projects in the metro area in the last five years, in addition to recent projects for the City of
Arden Hills. We are experts in resident outreach, building stakeholder consensus, and execution
through the construction process. You can trust that when you put this project in our hands,
miscommunication and costly mistakes will not happen.
WE WATCH YOUR BOTTOM LINE – Choosing Bolton & Menk ensures the City of
Arden Hills receives great value from every dollar spent. Proactive problem solving keeps
small things small. This project team will build on past project experiences, both in the
City of Arden Hills and surrounding communities, leading to increased project efficiency
and an established understanding of the city’s standards and requirements for its street
improvement projects. This project has a similar scope to previous projects in the city and
we have experience completing all of the various scope items identified for this project.
Based on these similarities to previous projects, our team can hit the ground running and
begin providing value to the city right from the start.
WE BRING AN EXPERIENCED TEAM – Municipal engineering is at the core of what
we do. Our strength is derived from our talented and experienced staff, extensive project
experience, and relationships with governmental and regulatory agencies. The Bolton &
Menk team has successfully delivered street and utility projects for the City of Arden Hills
each of the past two years. Our team was carefully selected to provide all the necessary
services to successfully deliver this project. Having worked on several projects in Arden Hills
previously, I will play an active role in the project’s progress and maintain communication
with city staff. You can trust our proven team to continue to deliver projects in a manner
the City of Arden Hills has learned to expect of Bolton & Menk.
In continued service to the City of Arden Hills, we are excited at the opportunity to
complete the 2026 PMP Street and Utility Improvements project. I will serve as your lead
client contact and project manager. Please contact me at 612-759-7240 or
Bradley.Fisher@bolton-menk.com if you have any questions regarding our proposal.
Respectfully submitted,
Bolton & Menk, Inc.
Brad Fisher, PE
Project Manager
February 26, 2025
David Swearingen, PE
Public Works Director/City Engineer
City of Arden Hills
1245 W Highway 96
Arden Hills, MN 55112
RE: Proposal for 2026 PMP Street and
Utility Improvements
EXHIBIT A
We understand the street project areas include Karth
Lake Drive from the west cul-de-sac to Pleasant Drive,
Pleasant Drive from Amble Drive to the north cul-de-sac,
Pleasant Circle from the west cul-de-sac to Lexington
Avenue (CSAH 51), Amble Drive from Karth Lake Drive to
Lexington Avenue, Amble Circle from Amble Drive to the
north cul-de-sac, Karth Lake Circle from Hamline Avenue
(CSAH 50) to the south cul-de-sac, and Cummings Park
Drive from the west cul-de-sac to Lexington Avenue. The
trail project area includes select trail segments on the
east side of Cummings Park, connecting to the Lexington
Avenue trail.
The major project elements are anticipated to include
roadway rehabilitation, select trail improvements,
select storm structure replacements, select watermain
replacements, select sanitary sewer rehabilitations,
sediment removal at lake outlet locations, and ancillary
improvements. The street project areas do not include
any parallel sidewalks or trails, except for a trail along
the south side of Cummings Park Drive. Based on city
field notes, we understand that ADA improvements will
only be implemented at two pedestrian ramp locations
on the west end of Cummings Park Drive.
The 2026 PMP Street and Utility Improvements project
is identified within the City of Arden Hills’ current Capital
Improvement Plan for construction in 2026. The project
area is generally bound by Hamline Avenue to the west,
Lexington Avenue to the east, County Road 96 W to
the north, and County Road F to the south. The project
area topography generally slopes towards Karth Lake.
The project area is primarily residential with a park area
separating the residential properties from the industrial
properties surrounding Cummings Park Drive. The
project areas were originally constructed as part of five
platted developments identified in the RFP as having
been completed primarily between 1977 and 1979
except for the Boston Scientific campus, which was re-
platted in 2015. The project area includes approximately
132 properties adjacent to the street improvements.
During development, the public utilities were
constructed with polyvinyl chloride (PVC) sanitary
sewer, ductile iron pipe (DIP) watermain, DIP sanitary
forcemain, and reinforced concrete pipe (RCP)
storm sewer. Karth Lake also includes a more recent
installation of an outlet pump to manage the lake levels.
Grit chambers were also added to some storm sewer
outlet locations to capture sediment prior to getting
to the lake. City staff indicated all record drawings are
available for the project area.
Since the infrastructure’s initial construction, city
pavement management records indicate the most recent
structural pavement improvement projects include:
• Amble Drive – 1994 Reconstruction
• Amble Circle, Karth Lake Drive, Pleasant Drive
(between the north and south cul-de-sacs), and
Pleasant Circle – 2003 Mill & Overlay
• Cummings Park Drive and Pleasant Drive (from Amble
Drive to the south cul-de-sac) – 2003 Reconstruction
• Karth Lake Circle – 2007 Reclamation
We have reviewed in detail the full request for proposals (RFP), proposed project improvements maps,
storm sewer field inspection notes, watermain field inspection notes, and sanitary televising notes.
Additionally, we have conducted our own field site visits to better understand the project area and
identify potential unique project considerations.
PROJECT UNDERSTANDING
SUSTAINABLE
SOLUTION
ECONOMICALLY V I A B L E TECHNICALLY F
E
A
S
I
B
L
E
E
N
V
I
R
O
N
M
E
N
TALLY COMPATIBLE P U B L I C LY ACCEPTABLE
3 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSProject Understanding
EXHIBIT A
The current pavement condition index (PCI) ratings
for the proposed project streets range from 17 to 40,
except for Karth Lake Circle, which is rated 64. The
street pavement surfaces are generally in poor condition
and have seen an increased need for maintenance
operations which all indicate the pavements are beyond
their life cycle and in need of rehabilitation. As part of
the feasibility stage of the project, the City of Arden
Hills will enlist a geotechnical engineering consultant to
complete pavement cores and shallow borings on the
project streets and trails which will be used to develop
a pavement evaluation report. The report will make
recommendations for the rehabilitation method of each
street and the trails. It is anticipated that a combination
of mill and overlay and reclamation pavement
rehabilitation methods will be utilized on the project.
Sanitary sewer improvements will generally be limited
to the replacement of castings and rings on sanitary
structures and select spot repairs. City of Arden Hills
Public Works staff televised the sanitary sewer mains in
the project area and identified proposed sewer segments
in need of trenchless repairs along with the proposed
repair method. The Bolton & Menk project team will
review the televising and confirm the identified repairs
or make recommended adjustments for each identified
sewer segment. It is anticipated that no work will be
required on sewer service laterals.
City public works staff conducted preliminary field
inspections of the existing watermains and storm
sewer in the project area and identified locations
and methods for repairs and/or replacements.
Watermain improvements will be limited to gate valve
box adjustments, select gate valve replacements or
additions, select hydrant replacements or additions,
and possible relocation of the watermain along the
south side of CSAH 96 which will also be evaluated.
City staff indicated they will be completing a follow up
field inventory to document all model 59 hydrants in
the project areas that will be provided with the intent of
replacing the hydrants and their leads.
Based on the evaluated conditions, storm sewer
improvements will be limited to catch basin/manhole
casting adjustments, select structure replacements,
potential rehabilitation of existing grit chambers,
addition of new storm structure BMPs (such as including
a sump and SAFL baffle) to capture sediment prior
to entering the lake, rehabilitation to select storm
pipe aprons, and riprap rehabilitation at select outlet
locations.
As part of the project, the city would also like to remove
the accumulated sediment in Karth Lake at the five
storm sewer outlet locations. The accumulated sediment
quantity to be removed at each of the delta locations will
be determined by completing a bathymetric survey. It is
assumed that the accumulated sediment will generally
be contained within an approximate 100-foot radius of
the outlet location. Pond sediment sampling, testing,
and analysis will be conducted consistent with MPCA
standards based on its Managing Dredge Materials Best
Management Practice Guidance to determine the MPCA
management level necessary for landfilling the excavated
material generated from dredging the ponds. Easements
exist over the storm sewer outlets, however, the grades
down to the lake and private landscaping features may
make access to each location difficult or infeasible
within the existing easements, especially as it relates
to trucking out the excavated sediment. Further, it is
noted that completely draining the lake to accommodate
the sediment removal is likely not possible and would
therefore require specialty construction methods to
conduct the operations. These potential obstacles will
be evaluated in detail through the feasibility study to
determine the practicality and options for the sediment
removal operation, as well as identified storm sewer
improvements at these locations.
4 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSProject Understanding
EXHIBIT A
The Karth Lake Improvement District (KLID) consists
of Karth Lake’s lakefront property owners. The KLID
board developed the Karth Lake Management Action
Plan and through consultation with the Rice Creek
Watershed District (RCWD), have completed studies
which have collectively identified various improvements
in and around Karth Lake. Karth Lake does not have an
emergency overflow route and would lead to flooding
without management of the lake levels. A pump was
installed and is operated by the city to manage the lake
level within an approximately 2-foot bounce level. The
KLID modeled the pump operations and has made a
recommendation to revise operations to limit the lake
to a 6-inch bounce level. Options to implement this
improvement to the pumps will be evaluated during the
feasibility stage of the project and the selected option
will be incorporated during final design.
Additional improvements identified to Karth Lake include
a stormwater BMP retention pond to be constructed
at the southeast side of the lake to treat surface water
runoff from Cummings Park prior to entering the lake,
retaining wall replacement to alleviate erosion into the
lake surrounding the failing timber retaining wall near
the outlet pump, and installation of sump structures with
SAFL baffles to the last storm structure in the street prior
to outletting to the lake at the two locations currently
without pretreatment. Each of these three items are
expected to be eligible for RCWD grants and applications
will be developed to assist with potentially obtaining said
funds as part of the project process.
RCWD rules will require consideration on the
project, though based on the project being primarily
rehabilitated, we understand these rules will not have
a significant influence on the project design given the
proposed scope. Bolton & Menk’s project team will work
to identify what potential additional BMP measures will
be required based on their rules and how they apply to
the project.
In addition to reviewing the project documentation,
we have visited the site and considered the roadway
rehabilitation process, the existing curb and gutter,
pavement condition, and drainage improvements. Based
on review of the National Wetland Inventory (NWI) and
Public Waters Inventory (PWI), wetland delineations and
associated permitting will be necessary for the sediment
removal work and the other storm sewer improvement
work in/around Karth Lake.
Additionally, our site visit indicated a few specific
locations to be analyzed further during the project
development:
• Potential drainage issues, particularly in select
segments of existing curb and gutter
• Significant pavement deterioration in areas that may
require additional subsurface evaluations
• Potential realignment of the trail crossing on
Cummings Park Drive
We understand communication is critical in all aspects of
the project. We will follow the city’s public involvement
process and work closely with city staff throughout
all project phases to keep you informed and educated
on the design taking place. We will provide requested
updates to the city council and work with residents from
preliminary design through construction to help assist
with their questions and specific needs.
We also understand the city’s desire to minimize
consultant amendments, and as such, we invested
significant due diligence in preparation of this proposal
in hopes of flushing out potential changes before they
ever occur. It is never our goal to encumber additional
services on a project. Our project team strives to achieve
a successful but unsurprising project delivery process.
Ka
r
t
h
L
a
k
e
Ka
r
t
h
L
a
k
e
N ursery Hill Lane
Amble RoadArden View Cour
t
Wynridge Driv e
W
y
n
c
r
est Lane
W y n c r e s t C o urt
Indian Oaks Trail
A
mble Drive
Karth Lake Drive
Pleasant Circle
Innovation Way
Cummings Park Drive
Quality Drive
K
a
r
t
h
L
a
k
e
C
i
r
c
l
e
Pl
e
a
s
a
n
t
D
r
i
v
e
Pleasant DriveNursery Hill Lane
Amble RoadArden View Cour
t
Wynridge Driv e
W
y
n
c
r
est Lane
W y n c r e s t C o urt
Indian Oaks Trail
A
mble Drive
Karth Lake Drive
Pleasant Circle
Innovation Way
Cummings Park Drive
Quality Drive
K
a
r
t
h
L
a
k
e
C
i
r
c
l
e
Pl
e
a
s
a
n
t
D
r
i
v
e
Pleasant Drive
51
50
96
Karth Lake ParkKarth Lake Park
LEGEND
Existing Trails
Street Project Area
Trail Project Area
5 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSProject Understanding
EXHIBIT A
BRAD FISHER, PE
Project Manager
Brad will oversee the project team and manage overall project delivery. He
will establish and maintain communication with city staff so the City of Arden
Hills' needs are met during design and construction. Brad will also lead project
design, focusing on quality control and quality assurance, and guide the plan and
specification preparation.
Brad is a municipal project manager who began his career in 2010 before joining
Bolton & Menk in 2014. He has worked on many municipal projects consisting
of roadway design, including municipal State Aid design and utilities such as
sanitary sewer, water main, and storm sewer. Brad is passionate about listening
to his clients’ needs and delivering their vision. He completes project planning,
design, preparation of construction plans and specifications, and overall project management. His design experience
includes preliminary and final design, preliminary layout and design, preparation of feasibility reports, preparation
of construction plans and specifications, preparation of quantity take-offs and cost estimates, and project
documentation. Brad is diligent in working with multiple different work groups and subconsultants while managing
the project budget to keep his projects on track. In addition to his design experience, Brad has experience providing
successful construction administration services on various projects. He has expertise in the evaluation of concrete
pavement, determination of rehabilitation feasibility, and the implementation of concrete pavement rehabilitation
(CPR) methods and repairs.
MIKE WALTMAN, PE
Principal-in-Charge
Mike will provide close coordination with the City of Arden Hills and project partners.
He will be responsible for overall team management, monitoring progress,
schedule, and budget to ensure critical issues are promptly addressed.
Mike began his engineering career in 2006. Stemming from eight years of
construction inspection experience early in his career, Mike manages municipal
infrastructure projects and supports cities in pursuit of their goals. As a municipal
group leader, his expertise includes capital improvement planning, project
programming, funding, conceptual design, feasibility reports, completing final
design, and construction oversight. He has a passion for effectively managing all
aspects of project budgets, from pursuing grant opportunities to administering
projects to meet funding requirements, large and small. Mike's goal is client satisfaction, and he works hard to make
that happen. Mike is constantly responsive and makes his clients a priority in daily operations.
KEY PERSONNEL
Bolton & Menk recognizes the value of a forward-looking project team that can anticipate project
challenges, empathize with resident concerns, and build project consent through a creative and
comprehensive analysis of improvement alternatives. The team we propose for the 2026 PMP Street
and Utilities Improvement project has this experience. We have provided a brief background and
description of key individual roles. These individuals have track records of successful projects and, just
as importantly, are enthusiastic and committed to meeting and exceeding your expectations.
6 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSKey Personnel
EXHIBIT A
WORK PLAN AND PROJECT APPROACH
TASK 1: PROJECT MANAGEMENT
AND COORDINATION MEETINGS
Bolton & Menk will designate Brad Fisher as the project manager
to provide a single point of contact throughout the duration
of the project and to conduct overall project management to
keep the project on schedule and on budget. We will attend and
coordinate the necessary meetings with city staff, as laid out in
the project schedule. We will also attend and participate in up to
five city council meetings or work sessions, as required for the
project, to present project information.
City Staff Project Kickoff Meetings and
Design Coordination Meetings
Bolton & Menk will conduct a feasibility kickoff meeting and a
design kickoff meeting with city staff. At the meetings, we intend
to revisit our project understanding and outline our approach
to meeting the city’s project goals and determine any necessary
initial meetings with other governing agencies. We will prepare to
lead with the city’s vision during discussion with these agencies.
Up to five subsequent design coordination meetings will be held
to:
• Review and discuss the technical design layout during the
feasibility stage
• Discuss 60, 90, and 100 percent plans
• Determine one additional meeting with topic/need during the
project development process
To minimize consultant time for the city, we intend to host these
meetings virtually.
Rice Creek Watershed District (RCWD)
Bolton & Menk has a rich history in designing, permitting, and
constructing these types of projects, specifically in communities
throughout the RCWD. We know what the RCWD will expect from
us, and they are familiar with our permitting submittal packages.
This translates to effective communication, uninterrupted project
schedules, and cost savings for the City of Arden Hills.
The City of Arden Hills can be assured the Bolton & Menk team will provide outstanding technical
deliverables, exceptional leadership in public and stakeholder involvement, and superior project
management in a timely and cost-effective manner. The detailed work plan below is outlined by tasks
addressing all elements of the RFP.
= COMMUNICATION
7 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSWorK Plan and Project aPProach
EXHIBIT A
Bolton & Menk will facilitate a meeting with RCWD
staff to coordinate project goals early in the design
process. Specifically, coordination will be required when
the project’s proposed impervious area and sediment
removal quantities are known. Coordination with the
watershed on applicability and required information to
include on anticipated grant submittals will also lead
to more effective applications and hopefully translate
to grant awards. We anticipate one additional meeting
(two total meetings) prior to final permit submittal, if
required, as well as written and verbal communication
throughout design, to ensure project timelines are met.
Karth Lake Improvement District (KLID)
Bolton & Menk will facilitate a meeting with the KLID
designated representatives to coordinate project
goals, discuss constructibility, and determine the best
approaches to implementation. It is assumed that
the KLID will share their modeling and studies to date
that support the changes to the Karth Lake pumping,
specifically as it relates to the proposed bounce level.
Private Utility Coordination
We recognize the statutory requirement to conduct a
utility coordination meeting during the design process.
This will also be used to verify the accuracy of private
utility locations identified in the survey drawing,
coordinate with private utility owners regarding any
improvements they wish to complete in conjunction with
the project, and discuss known or potential conflicts
between proposed public infrastructure and privately-
owned utilities requiring relocation. We have included
this scope and associated fee in our proposal to minimize
potential for consultant driven contract changes later.
Private utility organizations will also be invited to the
preconstruction meeting so they will be engaged twice
throughout the project process.
It is our understanding that there is a communications
project currently underway, or recently completed, that
is upgrading existing facilities or installing new facilities
within the project area. It is also our understanding
that Xcel Energy has indicated their facilities may need
to be upgraded in the project area. We will coordinate
with all utility companies with facilities in the project
area to understand their existing projects and proposed
improvements.
Similarly, should private utility owners identify a different
location of their buried utilities from the location
originally depicted based on provided maps, Bolton &
Menk will re-draft the utility location based on maps
provided by the utility owner to incorporate into the
project plans. Drafting utilities based on plans is likely a
reasonable approach given the limited public utility work
on this project. We have also included these efforts in
our proposed fee to minimize potential for consultant
driven changes later. Should risks increase due to likely
or known conflicts with major private utilities, Bolton &
Menk can survey these private utilities for an additional
fee upon city request.
Our water resources team will review available studies
related to the pumping operations of Karth Lake,
including the modeling of the existing conditions which
we understand has already been completed.
TASK 2: DATA COLLECTION
AND INFORMATION REVIEW
Bolton & Menk will collect and review all the information
made available by the city, as laid out in the RFP,
including but not limited to city record plans, plat
information, pavement condition ratings, sanitary sewer
televising, watermain break/leak history, GIS database,
field observations, and city design standards. Applicable
information resulting from this review will be included
in the base map that will be drafted for use in project
design.
Our water resources team will review available studies
related to the pumping operations of Karth Lake,
including the modeling of the existing conditions which
we understand has already been completed.
TASK 3:
TOPOGRAPHIC SURVEY
Bolton & Menk will conduct a field survey to create a
base map identifying above- and below-ground existing
features in electronic format at the locations indicated
for full field survey below. Limited field survey is
anticipated to be required on select locations only based
on the anticipated project improvements. A bathymetric
survey will be conducted on each of the five pond outlet
locations in Karth Lake from the edge of water level
to an approximate 100-foot radius around each outlet
apron. The remaining street areas proposed for mill and
overlay or reclamation rehabilitation methods will be
drafted from curb line to curb line based on available
aerial photograph and record drawing information.
8 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSWorK Plan and Project aPProach
EXHIBIT A
This collective base map will be used as the basis and
background for final design.
The full field survey will include the following at select
locations identified below:
• Submit Gopher State One Call tickets for field
markings and maps along full topographic areas
identified below; field markings will be collected on
the ground via topographic survey
• Submit Gopher State One Call ticket for field markings
of all curb stops to be marked by city public works
staff; curb stop locations will be collected via
topographic survey and a file of the data will be
provided for the city’s implementation into their
citywide GIS system; city public works staff will
identify any curb stops in need of adjustment as part
of the project
• Establish project control based on Ramsey County
coordinate system, NAD 83 (2011 Adj.) with
elevations based on NAVD 88
• Use county GIS parcel linework for right-of-way
and property lines; easements will be added in
an approximate manner based on available plat
information
• Collect field locations of existing conditions and
utilities
• Complete structure inventories on existing structures,
including rim and invert elevations
The full field survey will be completed at the following
locations:
• BMP 1 – Phase 2 at the southeast side of Karth Lake,
adjacent to Cummings Park
• Curb stops for each property adjacent to the proposed
street improvements
• Storm sewer structure replacement areas, which
includes capturing the structures upstream and
downstream from the subject structure and ground
shots over the identified storm corridor
• Collect location and rim elevations via GPS of all
structures, gate valves, etc. in the street pavement
(from curb to curb) of the street project areas to
ensure all structures are identified for adjustment as
part of the project
• Set control points near the five storm outlet locations
to Karth Lake for use in completing the bathymetric
surveys and for use in construction to verify designed
elevations are met
• The two pedestrian ramp ADA improvement areas,
extending back approximately 100 feet for potential
trail/walk realignments
• All proposed trail rehabilitation areas
• The proposed retaining wall replacement and its
surrounding area for potential improvements
• The existing lake pump outlet system
• The watermain loop north of Karth Lake Drive, within
existing easements, along the south side of CR 96 for
potential relocation
The aerial survey will include the following efforts
in street rehabilitation areas and all other areas not
identified in the full field survey areas:
• County GIS parcel linework will be used for right-of-
way and property lines
• Easements will be added in an approximate manner
based on available plat information
• Submit Gopher State One Call tickets for maps;
utilities will be drawn in the base map in an
approximate manner based on provided mapping
• Existing curb lines will be depicted based on the aerial
photography and available record drawings
Bolton & Menk will also complete a bathymetric
assessment of the five delta locations in Karth Lake to
quantify the sediment to be removed in an approximate
100-foot radius around each outlet apron. The following
further describes the scope of work:
• Using a kayak, we will measure the depth to the top
of sediment, then push the blunt-ended grade rod to
the hard bottom and measure again; these depths
are recorded, along with a GPS waypoint, for digital
surface modeling
◦We will compare the measured hard bottom to
the original as-built and/or design information (if
available) and present to the city
◦If these elevations differ significantly, then a
verification check may be appropriate
9 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSWorK Plan and Project aPProach
EXHIBIT A
• Our measurement technique also utilizes a depth
finder attached to the kayak
◦Depending on when in the year the bathymetric
data is collected, the sonar returns from vegetation
can cloud the dataset; sonar data will be collected
and further vetted for accuracy as digital surface
datasets are compiled
• Using AutoCAD tools, the collected data will be
converted and compiled in a digital format
◦Surface models will be created to simply quantify
the total accumulated volume; these models are
also provided to the contractor, should they use
automated equipment for sediment removal
• For dry, or very shallow (less than two feet) ponds,
traditional topographic survey methods will be used
An electronic base map will be created and submitted
to the city for review prior to initiating design work
based on the field, aerial, and bathymetric surveys. It is
assumed that no easement exhibits will be required for
the project.
If through the feasibility report, it is determined that
work around storm aprons is required and/or access
through easements from the street down to the lake
is required, additional topographic survey would be
required to shoot the entire easement corridor from
house to house. This work is not included in our proposal
but can be added for an additional fee at the time of
authorizing final design.
TASK 4: GEOTECHNICAL
EVALUATION COORDINATION
We have solicited a proposal from Braun Intertec on
behalf of the city for geotechnical evaluation services on
this project. It is assumed that geotechnical services will
be provided by Braun for the project under a separate
contract directly with the City of Arden Hills.
Geotechnical services will include preliminary materials
investigations by completing pavement cores and
shallow borings throughout the proposed street and trail
project corridors to provide recommendations on the
proposed street improvements and utility construction.
Additionally, Braun will conduct pond sediment
sampling, testing, and analysis consistent with
MPCA standards (Managing Dredge Materials Best
Management Practice Guidance) at the five identified
storm outlet locations to determine the MPCA
management level necessary for landfilling of the
excavated material generated from dredging the lake
deltas. A geotechnical report will be developed with
a summary of findings, including the recommended
street improvements with proposed street section,
bituminous mix designs, and other relevant construction
recommendations.
Braun has extensive experience performing these
preliminary materials investigation tasks on other
projects. They have worked with the City of Arden
Hills on several recent projects and are well-versed
in the city’s expectations. A full scope of services and
assumptions from Braun is included in their proposal.
The fee for this task includes Bolton & Menk’s work
to coordinate the geotechnical evaluation with Braun,
review the results, and provide recommendations
for implementation of the results into the project’s
proposed improvements.
TASK 5:
PUBLIC ENGAGEMENT
Effective, consistent public engagement is a key
component to the overall success of any project. Bolton
& Menk’s extensive communications capabilities allow us
to provide you with a tailored approach to engagement
that is organized, efficient, and proactive. Bolton & Menk
will engage the public and provide a forum for valuable
project discussion.
We will work with city staff to send out a letter with
preliminary project information notifying residents of
the upcoming project and directing them to take an
online survey/questionnaire to identify key project issues
and concerns from residents and businesses during the
feasibility phase of the project. This information will be
incorporated in the feasibility report.
We will conduct an open-house style public
informational meeting during the final design of
construction plans to inform residents of the proposed
improvements. We will solicit comments and input
from residents. These comments will be discussed with
city staff and incorporated into the project design, as
directed.
10 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSWorK Plan and Project aPProach
EXHIBIT A
Bolton & Menk will conduct a second public
informational meeting prior to the start of construction
and prior to the assessment hearing. This meeting
will focus on what to expect during the construction
process, schedule, access, and impacts. The open
house will discuss the construction staging plan and
estimated duration, access considerations during
the utility construction, and what residents may see
during construction to plant the seeds of what they can
anticipate in advance. The meeting will also include final
assessment information to answer any related questions
prior to the assessment hearing. Bolton & Menk will
develop and bring all applicable meeting materials,
including invitations/notices, boards, handouts, and sign-
in sheets.
TASK 6:
FEASIBILITY STUDY
Work under this task includes identifying proposed
improvements, identifying issues or risks to the
project’s success requiring greater exploration during
final design, and communication of these elements
to project stakeholders. We will perform high-level
preliminary design (to approximately 15 percent design
level) to prepare a schematic of the proposed project
improvements as directed by the city. Further evaluation
of the stormwater BMP retention pond may be required,
including model development, execution, and validation.
This schematic design will include both proposed
roadway and utility improvements and will be used to
determine if the project is necessary, feasible, and cost-
effective.
As part of the feasibility task, we will review existing
pumping operations as recommended by the Karth
Lake Improvement District Board for direction on
implementation of updates into the project. A site visit
with city personnel will be conducted to assist with
this evaluation, determine the existing pump setup,
and identify options for rehabilitation or replacement.
A meeting will be held with the city, RCWD, KLID, and
MnDNR, if needed, to discuss the existing and proposed
pumping scenario and project goals and to outline
permitting requirements. Up to three alternatives
will be developed for modifications to the pumping
configurations.
Our team will also provide risk assessments and
recommendations regarding the existing storm aprons
that are perpetually underwater. Our water resources
team lead will perform a field visit of each storm apron
location, analyze each location, and provide risks and
recommendations for inclusion in the feasibility report.
Implementation of any potential recommendations
resulting from the risk assessment are not included
in this proposal, but a revised scope and fee can
be provided if the city decides to implement such
improvements.
We will deliver a feasibility report that discusses each
individual project segment, the research and analysis
that was performed, the alternatives considered, and
the cost estimate for the recommended improvements.
It is our understanding that the project is proposed to
be funded entirely with local funds and potential grant
funds, if obtained, and no state or federal contract
requirements will be necessary.
Additionally, a preliminary assessment roll will be
prepared for the preliminary schematic in compliance
with the requirements of the city’s Special Assessment
Policy and Minnesota Statutes Chapter 429. The city’s
policy states that the city will assess 50 percent of the
costs associated with bituminous overlay for a typical
residential zoned street section on a unit basis and 70
percent for commercial/industrial zoned properties. The
city requested approaching assessments for this project
by completing property appraisals during the feasibility
study to support the measured benefit to the assessable
properties.
We have solicited a proposal from a property appraiser
on behalf of the city for property appraisal services on
this project. It is assumed that the benefit appraisal
services will be provided by the property appraiser
for the project under a separate contract directly with
the City of Arden Hills. The project appraisals will be
evaluated based on the improvement type (rehabilitation
method) and property type (residential or industrial)
receiving the benefit to develop an assessment rate
or a range of assessment rates for each situation. It is
anticipated that the median value would be used for
comparison purposes if a range is provided.
11 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSWorK Plan and Project aPProach
EXHIBIT A
The feasibility report will include a review of the
calculated assessment rate per the assessment policy,
the determined appraisal rates, and special assessment
rates applied to past projects in the City of Arden Hills.
City staff will review anticipated special assessments
with the city council at a work session prior to finalizing
the feasibility report. The final feasibility report will be
presented at a city council meeting.
TASK 7:
FINAL DESIGN
Final design and construction plans will be completed
in AutoCAD Civil 3D and developed in coordination with
city staff. Major design components will include:
• Removals/existing conditions plans, including
locations of all existing utilities identified in the field
survey or as mapped based on subsequent utility
coordination
• Typical sections
• Standard details
• Erosion control plan and stormwater pollution
prevention plan (SWPPP), if necessary, including
proposed restorations
• Grading plans for five proposed sediment removal
locations and design of a new stormwater BMP
retention pond
• Sanitary sewer and watermain plan sheets
◦Assumes up to 10 gate valve replacements or
additions to existing watermain and up to five
hydrant replacements or additions to existing
watermain
◦Assumes up to 10 trenchless sanitary sewer spot
repairs
◦Assumes no watermain modeling or further
evaluation of the existing system is required,
however, this scope of work can be added in the
future, if determined necessary
• Storm sewer plan sheets, including structure invert/
rim elevations with profile views for identified storm
sewer improvement locations
◦Assumes up to five storm apron replacements, up
to 10 storm structure replacements or additions,
and up to five locations of riprap rehabilitation at
storm outlets
◦Modeling and analysis for spread and sizing of
storm sewer is not required
◦Plans will include implementation of pumping
operation updates for Karth Lake per city direction
(to take the lake bounce from a 934 to 936
elevation range to a 6-inch bounce level)
»Our proposal assumes DNR and RCWD
coordination and/or permitting has already
been completed and will not be required; also
assumes hydrology studies and modeling have
already been completed, are accurate, and can
be shared for use in design
»Our proposal assumes the selected options
will require a single plan sheet and associated
specification for modifications to the existing
pump or up to replacement of the pumps,
but no modifications or additional structures/
site improvements; if structure or site
improvements are necessitated based on the
selected option, our team can provide those
design services for an additional fee
»We will develop a drainage report that
documents the final design modifications to
Karth Lake water levels and inundation duration
• Street plan sheets, including roadway alignment and
widths
• Trail plan and profile sheets, including trail alignment,
profile, and widths
• Retaining wall plan and profile sheet and potential
improvements to the access area surrounding it
◦Full structural design of the retaining wall will be
required for submittal from the selected contractor
• Intersection detail sheet for the ADA pedestrian ramp
improvements area only
• Cross sections at 50-foot intervals, driveways, and
critical design locations for the trails only
• Signing and striping plan
◦No changes are proposed—where impacted by
improvements, notes to salvage/reinstall signposts
along with their associated signage will be included
and striping will be replaced in-kind
◦All street signs, including street name blades, are
assumed to be replaced as part of the project; city
staff will provide a field inventory of actual needs
once completed
• Traffic control plan sheets
• Preparation of statement of estimated quantities,
including street, trails, utilities, and miscellaneous
construction items, all consistent with MnDOT item
designation numbers and measurement/payment
requirements will be incorporated
• Preparation of the project manual and specifications
◦Standard front-end documents provided by the city
and edited by Bolton & Menk for project specifics
◦Special provisions and technical specifications for
project-specific items of work
12 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSWorK Plan and Project aPProach
EXHIBIT A
Other than where specifically identified otherwise,
the plan drawings will primarily be a two-dimensional
design based on aerial photography. It is assumed
that all streets and curbs will remain in their existing
locations/elevations during the mill and overlay and
reclamation operations. The project will only include
spot replacements of the existing curb and gutter that
inhibits proper drainage or is structurally deficient.
Design will be conducted to meet or exceed RCWD
permitting requirements for stormwater management
and erosion control. Upon completion of final plans,
we will submit all required information to RCWD for
verification/approval.
Our scope of services assumes the project will be
designed such that the RCWD stormwater management
trigger for a public linear project (less than one acre
of new or reconstructed impervious – excluding mill/
overlay and reclamation methods) is a design constraint.
We do not anticipate, nor does our scope of services
include design of volume control, water quality, and
rate control practices. Watershed standards are subject
to change and potential changes to the rules should be
considered during the design of this project. However,
we cannot anticipate what these changes might entail
and will have to scope our services based on the current
standards and how we anticipate RCWD will view the
proposed project work.
Bolton & Menk will provide plan submittals at 60 and 90
percent for city review prior to submitting the final plans
for bidding. We will provide specification submittals at
90 percent for city review, prior to submitting the final
specifications for bidding. Three final paper copies and
a PDF digital copy of the plans and specifications will be
provided to the city for bidding.
Using past bid information from the City of Arden
Hills and other nearby metro communities—as well
as current contractor pricing, overall city knowledge,
local contractors, and site conditions, we will prepare
an opinion of probable construction cost. Electronic
and hard copies of the opinion of probable cost will
be provided to the city and be used for bidding and
assessment purposes.
TASK 8: PERMITTING AND
GRANT APPLICATIONS
Our team will prepare permit applications, secure city
signatures, and submit them to governing agencies for
all required permits related to the project (permit fees
will be paid for by the city and are not included in our
proposed fees). It is assumed that the following general
permits will be required:
• MPCA Construction Stormwater permit
• RCWD Erosion and Sediment Control Plan permit
• WCA permits
• MnDNR Public Waters Work permit
• Ramsey County right-of-way permit
Conference calls will be coordinated with governing
agencies to discuss permit applications, if necessary. It
is assumed that RCWD permits will not be required for
stormwater management or activities associated with
lake sediment removal.
Additional specialty permits will also be required at the
five storm outlet locations into Karth Lake, surrounding
the trail and new stormwater pond project areas.
Completion of a Level 2 wetland delineation is necessary
to determine the exact limits of the wetlands in relativity
to the proposed improvements. A certified wetland
delineator will visit the site to delineate all aquatic
resource boundaries within the designated areas. The
delineation will include transects and sampling in the
vicinity of those wetlands, placing 3-foot pin flags at the
limits of any wetlands found. Our delineator will use a
sub-meter GPS unit to accurately locate and map each
point and prepare a written report of our findings. If it
is determined that additional wetlands delineations are
necessary, our team can provide additional scope of
work for an additional fee at the hourly rates identified.
Bolton & Menk will use the aquatic resource delineation
to determine and prepare the appropriate permit
application to account for any aquatic resource impacts
proposed by the project. Preliminary review of the
project activities suggests permanent wetland impacts
will be avoided. Bolton & Menk will prepare a no-loss/
exemption application to account for any temporary
aquatic resource impacts. This will include the MN Joint
Application to the U.S. Army Corps of Engineers and
Local Government Unit. The submittal of Work in Public
Water permit to the MnDNR will also be required due to
the activities proposed in Karth Lake.
13 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSWorK Plan and Project aPProach
EXHIBIT A
The ordinary high water level (OHWL) will be reviewed
to determine the full jurisdictional extent of the MnDNR
throughout the project area. These applications will
include GIS-based figures, permit narrative, and project
plan set.
The anticipated aquatic resource permits will trigger
state and federal threatened/endangered species review.
To ensure the city is in compliance with Minnesota's
Endangered Species Statute and the Federal Endangered
Species Act, Bolton & Menk will complete an NHIS
request on the Minnesota Conservation Explorer
website and coordinate with MnDNR. We will employ
the Information for Planning and Consultation (IPaC)
tool to complete preliminary federal threatened and
endangered species coordination with USFWS. Our
proposal assumes threatened and endangered species
field surveys will not be required as part of the project.
In some cases, the reviewing agencies request additional
information and/or a technical evaluation panel
meeting during the review process. If our attendance
is requested at a meeting to discuss the acceptance
of the delineated boundaries or the agencies request
additional information, this service will be provided on
an estimated hourly basis.
Once plans are nearing completion, we will submit
RCWD grant applications for the three eligible items
identified by city staff, assuming the applicable grant
application window is open and one application with
three components will be submitted:
• BMP 1 – Phase 2 as identified in the watershed study
for Karth Lake (Phase 1 remediated the slope and
erosion issues in the area; Phase 2 will treat the water
prior to entering the lake)
• Retaining wall replacement as identified in the
watershed study for Karth Lake
• New storm structure BMP installations (anticipated to
be sump structures with SAFL baffles installed)
TASK 9:
BIDDING ADMINISTRATION
Bolton & Menk will prepare the advertisement for bids
for the city to send to the required publications. We
will also provide plans and specifications for electronic
distribution to QuestCDN by the city.
Bolton & Menk will answer all written and verbal
questions from potential bidders. If necessary, we will
issue addenda to address project-related questions
during bidding. We will conduct an online bid
opening, tabulate bids, and prepare a letter of award
recommendation.
Bolton & Menk, including this specific proposed project
team, is well respected by contractors in the industry for
having constructable improvements. We will carefully
monitor the list of plan holders and gauge the market
during the bidding process to best position the City of
Arden Hills for bottom line success.
TASK 10:
CONSTRUCTION SERVICES
Bolton & Menk will assist the city through the
construction phase by providing construction
administration, observation, and staking services.
Our practical and pragmatic approach during design
is built from our team’s thorough understanding and
background working on the construction phase of
projects, which allows us to excel in this area.
We will plan and lead the project’s pre-construction
meeting and review shop drawings as they are submitted
by the contractor. Our survey crew will complete the
following field staking tasks during construction:
• Control verification
• Staking hydrant replacements and the identified
watermain realignment, if necessary
• Staking storm sewer structures and improvements,
as identified
• Staking new retaining wall
• Staking for trail improvements
• Staking new stormwater management BMP pond
grading
• Providing control points at each of the five storm
outlet locations in Karth Lake for contractor’s
equipment to complete pond dredging via GPS, if
requested
• Verification survey at conclusion of sediment
excavation/grading (assumes two per delta location)
Survey crews will provide construction stakes with
alignment and grade, as necessary, and documentation
of all survey points installed. If the assumptions above
change or other facilities are requested for staking, our
14 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSWorK Plan and Project aPProach
EXHIBIT A
project staff will be available to complete further field
staking for an additional fee based on submitted hourly
rates. It is assumed that no easement staking will be
required unless property research is added to project
scope to confirm the actual locations.
We will provide on-site construction observation
throughout the project. Our scope of services assumes
construction will take approximately 12 weeks, based
on discussions with city staff. It is expected that full-
time observation (45 hours per week on average) will be
needed during construction to complete inspection tasks
and resident coordination on this project.
These are based on the minimum amount of time and
effort to inspect work throughout the construction
season. The hours do not account for items outside of
Bolton & Menk’s control and it is possible that a higher
level of service will be needed at times. If the hours
and/or duration need to increase from the provided
construction schedule estimate, with the approval from
the city, Bolton & Menk can provide that level of service
for the additional hours needed at the hourly rate
provided in our Summary of Fees table.
A recent survey asked Bolton & Menk clients to rate
us on a scale of 1-10 on our ability to meet a project
budget and a project design schedule. They gave us
an average of 9.3 on our ability to meet a budget and
9.5 on our ability to meet a design schedule.
Bolton & Menk’s construction observer will observe the
work performed by the contractor per the project plans
and specifications, make notations for as-built purposes
where acceptable deviations are made by the contractor,
and produce the required documentation for this
locally funded project. This individual will also handle
communication and questions from residents, and they
will relay information between the contractor and the
city as necessary. The observer will also coordinate
construction materials testing with a testing agency to be
provided by the city; construction materials testing is not
included in our proposal and/or fees.
The construction observer will be available via
phone, email, and text to respond to residents’ needs
throughout construction. Our project team will provide
updates and notices as necessary for water shutdowns
and access restrictions, making sure residents have
access when possible and when needed. We will also
respond to commonly asked questions and requests
during the construction process.
Our project manager will provide oversight of our
construction observer, administer the construction
contract, and facilitate weekly construction meetings.
It is anticipated that our project manager will spend
approximately 10 hours per week over the estimated
construction duration on construction administration
responsibilities. They will conduct weekly construction
meetings with the contractor, prepare progress
payments monthly, and prepare change order
documents as necessary.
TASK 11:
PROJECT CLOSEOUT
Work under this task includes completing a review of the
project site with the city and the contractor. We will walk
the site with project stakeholders and identify any punch
list items that need to be addressed. We will provide a
copy of the punch list from the walk-through and review
the items in coordination with the construction observer.
Bolton & Menk will survey the final improvements and
prepare record drawings to deliver to the city for the
project. The as-builts will be in electronic PDF format,
including redlined elevations and changes made during
the construction process and documented by the
construction observer during their observation duties or
received separately from the city’s contractor.
The as-built survey will verify structure installations for
horizontal location, rim elevation, and inverts of fully
replaced structures (storm CBs/MHs and hydrants).
All other utilities remaining in place, including those
identified for casting replacement or adjustment, will not
be collected as part of the as-built survey.
15 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSWorK Plan and Project aPProach
EXHIBIT A
We have developed a schedule detailing the anticipated work tasks and completion dates. This
schedule is based on our review of the project background, description, and scope of services included
in the Request for Proposals, conversations with city staff, and our experience on other similar projects
and assumes contract approval in March. Upon selection, Bolton & Menk will work with City of Arden
Hills staff and other project partners to revise and update this schedule as needed to ensure successful
delivery of this project.
Month
1.0 Project Management & Coordination Meetings
1.1 Feasibility & Design Kickoff Meetings with City Staff
1.2 Up to Five Design Coordination Meetings with City Staff
1.3 Coordination Meetings with RCWD Staff & KLID
1.4 Utility Coordination Meeting
1.5 Up to Five City Council Meetings and/or Work Sessions
2.0 Data Collection and Information Review
2.1 Collect & Review City Provided Information
3.0 Topographic Survey
3.1 GSOC Tickets
3.2 Field Topo Survey (Identified Areas Only)
3.3 Bathymetric Surveys (5 Delta Locations)
3.4 Curb Stops Collection
3.5 Base Map Drafting
4.0 Geotechnical Evaluation
4.1 Soil Boring
4.2 Sediment Sampling/Testing
4.3 Geotechnical Report
5.0 Public Engagement
5.1 Feasibility Online Survey
5.2 Design Public Open House
5.3 Construction Public Open House
6.0 Feasibility Study
6.1 Feasibility Report
6.2 Preliminary Geometric Design
6.3 Preliminary Cost Estimate
6.4 Preliminary Assessment Roll
7.0 Final Design
7.1 60% Plans
7.2 90% Plans, Estimate, and Specifications
7.3 Final Plans, Estimate, and Specifications
8.0 Permitting & Grant Applicatons
8.1 General Permit Submittals
8.2 Wetland Delineation
8.3 Aquatic Resource Impact Permitting
8.4 Watershed Permitting
9.0 Bidding Administration
9.1 Bid Documents Posted on Quest CDN
9.2 Bidding Questions and Addenda
9.3 Bid Opening & Tabulation
9.4 Award of Project
9.5 Contracts
10.0 Construction Services
10.1 Pre-Con Meeting and Shop Drawing Review
10.2 Construction Administration
10.3 Construction Observation
10.4 Construction Staking
10.5 Construction Materials Testing
11.0 Project Closeout
11.1 Conduct Final Review of Project (Punch List & Clean Up)
11.2 Obtain Record Information
11.3 Record Drawings
November December May - OctoberJanuarySeptemberMayMarchApril
City of Arden Hills
November
2025-2026
March AprilJuneJuly
2026 PMP Street and Utility Improvements
August October February
11
SCHEDULE
16 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSschedUle
EXHIBIT A
The following table summarizes the hours and cost breakdown for each major work task item. The
estimated fee includes labor, general business, and other normal and customary expenses associated
with operating a professional business. Unless otherwise noted, the fees include vehicle and personal
expenses, mileage, telephone, survey stakes, and routine expendable supplies; no separate charges
will be made for these activities and materials. Expenses beyond the agreed scope of services and
non-routine expenses, such as large quantities of prints, extra report copies, out-sourced graphics and
photographic reproductions, document recording fees, outside professional and technical assistance,
and other items of this general nature will be invoiced separately.
City of Arden Hills
2026 PMP Street and Utility Improvements
Task No.Work Task Description
Pr
i
n
c
i
p
a
l
-
i
n
-
C
h
a
r
g
e
Pr
o
j
e
c
t
M
a
n
a
g
e
r
De
s
i
g
n
E
n
g
i
n
e
e
r
Wa
t
e
r
/
W
a
s
t
e
w
a
t
e
r
Pr
o
j
e
c
t
E
n
g
i
n
e
e
r
Wa
t
e
r
R
e
s
o
r
u
c
e
s
Pr
o
j
e
c
t
E
n
g
i
n
e
e
r
Na
t
u
r
a
l
R
e
s
o
u
r
c
e
Sp
e
c
i
a
l
i
s
t
Co
n
s
t
r
u
c
t
i
o
n
Ob
s
e
r
v
e
r
Co
n
s
t
r
u
c
t
i
o
n
P
r
o
j
e
c
t
Ma
n
a
g
e
r
Su
r
v
e
y
M
a
n
a
g
e
r
Su
r
v
e
y
T
e
c
h
n
i
c
i
a
n
Su
r
v
e
y
C
r
e
w
Ad
m
i
n
/
C
o
o
r
d
i
n
a
t
i
o
n
Total
Hours Total Cost
1.0 Project Management & Coordination Meetings 22 82 5 0 6 0 0 0 0 0 0 0 115 $21,830
2.0 Data Collection & Information Review 0 4 16 2 2 0 0 0 0 0 0 0 24 $3,552
3.0 Project Survey 0 2 22 0 24 0 0 0 18 61 228 0 355 $68,444
4.0 Geotechnical Evaluation Coordination 0 5 0 0 0 0 0 0 0 0 0 0 5 $925
5.0 Public Engagement 8 24 48 0 0 0 0 0 0 0 0 22 102 $14,974
6.0 Feasibility Study 7 74 204 11 67 2 0 0 0 0 0 4 369 $56,599
7.0 Final Design 14 130 390 36 40 0 0 0 0 0 0 42 652 $96,558
8.0 Permitting & Grant Applications 2 4 28 0 8 77 0 0 0 0 0 8 127 $19,478
9.0 Bidding Administration 0 18 2 0 0 0 0 0 0 0 0 22 42 $5,992
10.0 Construction Services 0 0 0 0 0 0 560 139 15 23 144 4 885 $139,751
11.0 Project Closeout 0 0 0 0 0 0 40 14 1 1 16 0 72 $11,710
Total Hours 53 343 715 49 147 79 600 153 34 85 388 102 2748
Average Hourly Rate $225.00 $185.00 $132.00 $175.00 $175.00 $160.00 $138.00 $185.00 $210.00 $190.00 $200.00 $109.00
Subtotal $11,925 $63,455 $94,380 $8,575 $25,725 $12,640 $82,800 $28,305 $7,140 $16,150 $77,600 $11,118
$439,813Total Fee
Bolton & Menk, Inc.
Project Name
City of XXX, Minnesota Section X - Page X
FEE ESTIMATE
17Fee estimate 2026 PmP street and Utility imProVements | city oF arden hills
EXHIBIT A
18 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSFee estimate
City of Arden Hills
2026 PMP Street and Utility Improvements
Task
No.Work Task Description Pr
i
n
c
i
p
a
l
-
i
n
-
C
h
a
r
g
e
Pr
o
j
e
c
t
M
a
n
a
g
e
r
De
s
i
g
n
E
n
g
i
n
e
e
r
Wa
t
e
r
/
W
a
s
t
e
w
a
t
e
r
Pr
o
j
e
c
t
E
n
g
i
n
e
e
r
Wa
t
e
r
R
e
s
o
r
u
c
e
s
Pr
o
j
e
c
t
E
n
g
i
n
e
e
r
Na
t
u
r
a
l
R
e
s
o
u
r
c
e
Sp
e
c
i
a
l
i
s
t
Co
n
s
t
r
u
c
t
i
o
n
Ob
s
e
r
v
e
r
Co
n
s
t
r
u
c
t
i
o
n
P
r
o
j
e
c
t
Ma
n
a
g
e
r
Su
r
v
e
y
M
a
n
a
g
e
r
Su
r
v
e
y
T
e
c
h
n
i
c
i
a
n
Su
r
v
e
y
C
r
e
w
Ad
m
i
n
/
C
o
o
r
d
i
n
a
t
i
o
n
Totals Costs
1.0 Project Management & Coordination Meetings
1.1 Feasibility & Design Kickoff Meetings with City Staff 4 8 12 $2,380.00
1.2 Up to Five Design Coordination Meetings with City Staff 5 10 15 $2,975.00
1.3 Coordination Meetings with RCWD Staff & KLID 3 6 6 15 $2,835.00
1.4 Utility Coordination Meeting 3 5 8 $1,215.00
1.5 Up to Five City Council Meetings and/or Work Sessions 15 15 $2,775.00
1.6 Project Management 10 40 50 $9,650.00
Subtotal Hours - Task 1 22 82 5 0 6 0 0 0 0 0 0 0 115 $21,830.00
2.0 Data Collection & Information Review
2.1 Collect & Review City Provided Information 4 10 14 $2,060.00
2.2 Karth Lake Pumping Research 6 2 2 10 $1,492.00
Subtotal Hours - Task 2 0 4 16 2 2 0 0 0 0 0 0 0 24 $3,552.00
3.0 Project Survey
3.1 GSOC Tickets & Field Meet 1 7 4 12 $2,340.00
3.2 Research, Calculations, & Control 3 3 11 17 $3,400.00
3.3 Field Topo Survey (Cummings ADA Improvements - 2 Locations)1 1 6 8 $1,600.00
3.4 Field Topo Survey (Identified Structure Replacements)2 1 40 43 $8,610.00
3.5 Field Topo Survey (Watermain Loop in Easement along Hwy 96)2 1 35 38 $7,610.00
3.6 Field Topo Survey (Identified Trails, Retaining Wall, & Storm Pond)5 1 95 101 $20,240.00
3.7 Bathymetric Surveys (5 Delta Locations)14 24 1 1 2 42 $6,848.00
3.8 GPS Curb Stops Collection & Rim Structure Locations in Streets 1 1 35 37 $7,400.00
3.9 Base Map Drafting 2 8 2 45 57 $10,396.00
Subtotal Hours - Task 3 0 2 22 0 24 0 0 0 18 61 228 0 355 $68,444.00
4.0 Geotechnical Evaluation Coordination
4.1 Coordination of Soil Borings, Sediment Sampling/Testing &
Geotechnical Report 5 5 $925.00
Subtotal Hours - Task 4 0 5 0 0 0 0 0 0 0 0 0 0 5 $925.00
5.0 Public Engagement
5.1 Feasibility Online Survey 8 8 10 26 $3,626.00
5.2 Design Public Open House 4 8 20 6 38 $5,674.00
5.3 Construction Public Open House 4 8 20 6 38 $5,674.00
Subtotal Hours - Task 5 8 24 48 0 0 0 0 0 0 0 0 22 102 $14,974.00
6.0 Feasibility Study
6.1 Feasibility Report 4 46 16 4 20 2 92 $16,042.00
6.2 Preliminary Geometric Design 2 12 48 62 $9,006.00
6.3 Preliminary Stormwater Pond BMP Design 96 10 106 $14,422.00
6.4 Karth Lake Pumping Evaluation 38 6 36 4 84 $12,802.00
6.5 Preliminary Cost Estimate 8 6 1 1 16 $2,622.00
6.6 Preliminary Assessment Roll & Benefit Appraisal Coordination 1 8 9 $1,705.00
Subtotal Hours - Task 6 7 74 204 11 67 2 0 0 0 0 0 4 369 $56,599.00
7.0 Final Design
7.1 60% Plans 4 40 160 8 212 $30,820.00
7.2 Stormwater Pond BMP Design 40 2 42 $5,630.00
7.3 Karth Lake Pumping Design 30 36 16 6 88 $13,714.00
7.4 90% Plans, Estimate, and Specifications 6 60 120 8 16 210 $31,434.00
7.5 Final Plans, Estimate, and Specifications 4 30 40 6 20 100 $14,960.00
Subtotal Hours - Task 7 14 130 390 36 40 0 0 0 0 0 0 42 652 $96,558.00
8.0 Permitting & Grant Applications
8.1 General Permit Submittals 2 4 8 8 22 $3,118.00
8.2 Wetland Delineation 30 30 $4,800.00
8.3 Aquatic Resource Impact Permitting 42 42 $6,720.00
8.4 Watershed Permitting 8 4 12 $1,756.00
8.5 Threatened & Endangered Species Review 5 5 $800.00
8.6 Watershed Grant Application 12 4 16 $2,284.00
Subtotal Hours - Task 8 2 4 28 0 8 77 0 0 0 0 0 8 127 $19,478.00
9.0 Bidding Administration
9.1 Bid Documents Posted on Quest CDN 2 2 6 10 $1,288.00
9.2 Bidding Questions and Addenda 8 2 10 $1,698.00
9.3 Bid Opening & Tabulation 2 6 8 $1,024.00
9.4 Award of Project 4 4 $740.00
9.5 Contracts 2 8 10 $1,242.00
Subtotal Hours - Task 9 0 18 2 0 0 0 0 0 0 0 0 22 42 $5,992.00
10.0 Construction Services
10.1 Preconstruction Meeting and Shop Drawing Review 20 14 4 38 $5,786.00
10.2 Construction Administration 120 120 $22,200.00
10.3 Construction Observation 540 540 $74,520.00
10.4 Construction Staking 15 23 144 182 $36,320.00
10.5 Construction Materials Testing Coordination 5 5 $925.00
Subtotal Hours - Task 10 0 0 0 0 0 0 560 139 15 23 144 4 885 $139,751.00
11.0 Project Closeout
11.1 Conduct Final Review of Project (Punch List & Clean Up)24 12 36 $5,532.00
11.2 Obtain Record Information 6 6 $828.00
11.3 Record Drawings 10 2 1 1 16 30 $5,350.00
Subtotal Hours - Task 11 0 0 0 0 0 0 40 14 1 1 16 0 72 $11,710.00
Total Hours 53 343 715 49 147 79 600 153 34 85 388 102 2748
Average Hourly Rate $225.00 $185.00 $132.00 $175.00 $175.00 $160.00 $138.00 $185.00 $210.00 $190.00 $200.00 $109.00
Subtotal $11,925.00 $63,455.00 $94,380.00 $8,575.00 $25,725.00 $12,640.00 $82,800.00 $28,305.00 $7,140.00 $16,150.00 $77,600.00 $11,118.00
Total Fee $439,813.00
Detailed Cost Estimate
Bolton & Menk, Inc.
Project Name
City of XXX, Minnesota Section X - Page X
EXHIBIT A
19 2026 PMP STREET AND UTILITY IMPROVEMENTS | CITY OF ARDEN HILLSFee estimate
City of Arden Hills2026 PMP Street and Utility ImprovementsTask No.Work Task Description Principal-in-Charge Project Manager Design Engineer Water/Wastewater Project Engineer Water Resoruces Project Engineer Natural Resource Specialist Construction Observer Construction Project Manager Survey Manager Survey Technician Survey Crew Admin/Coordination Totals Costs1.0 Project Management & Coordination Meetings1.1 Feasibility & Design Kickoff Meetings with City Staff 4 8 12 $2,380.001.2 Up to Five Design Coordination Meetings with City Staff 5 10 15 $2,975.001.3 Coordination Meetings with RCWD Staff & KLID 3 6 6 15 $2,835.001.4 Utility Coordination Meeting 3 5 8 $1,215.001.5 Up to Five City Council Meetings and/or Work Sessions 15 15 $2,775.001.6 Project Management 10 40 50 $9,650.00Subtotal Hours - Task 1 22 82 5 0 6 0 0 0 0 0 0 0 115 $21,830.002.0 Data Collection & Information Review2.1 Collect & Review City Provided Information 4 10 14 $2,060.002.2 Karth Lake Pumping Research 6 2 2 10 $1,492.00Subtotal Hours - Task 2 0 4 16 2 2 0 0 0 0 0 0 0 24 $3,552.003.0 Project Survey3.1 GSOC Tickets & Field Meet 1 7 4 12 $2,340.003.2 Research, Calculations, & Control 3 3 11 17 $3,400.003.3 Field Topo Survey (Cummings ADA Improvements - 2 Locations)1 1 6 8 $1,600.003.4 Field Topo Survey (Identified Structure Replacements)2 1 40 43 $8,610.003.5 Field Topo Survey (Watermain Loop in Easement along Hwy 96)2 1 35 38 $7,610.003.6 Field Topo Survey (Identified Trails, Retaining Wall, & Storm Pond)5 1 95 101 $20,240.003.7 Bathymetric Surveys (5 Delta Locations)14 24 1 1 2 42 $6,848.003.8 GPS Curb Stops Collection & Rim Structure Locations in Streets 1 1 35 37 $7,400.003.9 Base Map Drafting 2 8 2 45 57 $10,396.00Subtotal Hours - Task 3 0 2 22 0 24 0 0 0 18 61 228 0 355 $68,444.004.0 Geotechnical Evaluation Coordination4.1 Coordination of Soil Borings, Sediment Sampling/Testing & Geotechnical Report 5 5 $925.00Subtotal Hours - Task 4 0 5 0 0 0 0 0 0 0 0 0 0 5 $925.005.0 Public Engagement5.1 Feasibility Online Survey 8 8 10 26 $3,626.005.2 Design Public Open House 4 8 20 6 38 $5,674.005.3 Construction Public Open House 4 8 20 6 38 $5,674.00Subtotal Hours - Task 5 8 24 48 0 0 0 0 0 0 0 0 22 102 $14,974.006.0 Feasibility Study6.1 Feasibility Report 4 46 16 4 20 2 92 $16,042.006.2 Preliminary Geometric Design 2 12 48 62 $9,006.006.3 Preliminary Stormwater Pond BMP Design 96 10 106 $14,422.006.4 Karth Lake Pumping Evaluation 38 6 36 4 84 $12,802.006.5 Preliminary Cost Estimate 8 6 1 1 16 $2,622.006.6 Preliminary Assessment Roll & Benefit Appraisal Coordination 1 8 9 $1,705.00Subtotal Hours - Task 6 7 74 204 11 67 2 0 0 0 0 0 4 369 $56,599.007.0 Final Design
7.1 60% Plans 4 40 160 8 212 $30,820.00
7.2 Stormwater Pond BMP Design 40 2 42 $5,630.00
7.3 Karth Lake Pumping Design 30 36 16 6 88 $13,714.00
7.4 90% Plans, Estimate, and Specifications 6 60 120 8 16 210 $31,434.00
7.5 Final Plans, Estimate, and Specifications 4 30 40 6 20 100 $14,960.00
Subtotal Hours - Task 7 14 130 390 36 40 0 0 0 0 0 0 42 652 $96,558.00
8.0 Permitting & Grant Applications
8.1 General Permit Submittals 2 4 8 8 22 $3,118.00
8.2 Wetland Delineation 30 30 $4,800.00
8.3 Aquatic Resource Impact Permitting 42 42 $6,720.00
8.4 Watershed Permitting 8 4 12 $1,756.00
8.5 Threatened & Endangered Species Review 5 5 $800.00
8.6 Watershed Grant Application 12 4 16 $2,284.00
Subtotal Hours - Task 8 2 4 28 0 8 77 0 0 0 0 0 8 127 $19,478.00
9.0 Bidding Administration
9.1 Bid Documents Posted on Quest CDN 2 2 6 10 $1,288.00
9.2 Bidding Questions and Addenda 8 2 10 $1,698.00
9.3 Bid Opening & Tabulation 2 6 8 $1,024.00
9.4 Award of Project 4 4 $740.00
9.5 Contracts 2 8 10 $1,242.00
Subtotal Hours - Task 9 0 18 2 0 0 0 0 0 0 0 0 22 42 $5,992.00
10.0 Construction Services
10.1 Preconstruction Meeting and Shop Drawing Review 20 14 4 38 $5,786.00
10.2 Construction Administration 120 120 $22,200.00
10.3 Construction Observation 540 540 $74,520.00
10.4 Construction Staking 15 23 144 182 $36,320.00
10.5 Construction Materials Testing Coordination 5 5 $925.00
Subtotal Hours - Task 10 0 0 0 0 0 0 560 139 15 23 144 4 885 $139,751.00
11.0 Project Closeout
11.1 Conduct Final Review of Project (Punch List & Clean Up)24 12 36 $5,532.00
11.2 Obtain Record Information 6 6 $828.00
11.3 Record Drawings 10 2 1 1 16 30 $5,350.00
Subtotal Hours - Task 11 0 0 0 0 0 0 40 14 1 1 16 0 72 $11,710.00
Total Hours 53 343 715 49 147 79 600 153 34 85 388 102 2748
Average Hourly Rate $225.00 $185.00 $132.00 $175.00 $175.00 $160.00 $138.00 $185.00 $210.00 $190.00 $200.00 $109.00
Subtotal $11,925.00 $63,455.00 $94,380.00 $8,575.00 $25,725.00 $12,640.00 $82,800.00 $28,305.00 $7,140.00 $16,150.00 $77,600.00 $11,118.00
Total Fee $439,813.00
Detailed Cost Estimate Bolton & Menk, Inc.
Project Name
City of XXX, Minnesota Section X - Page X
EXHIBIT A
AA/EOE
Braun Intertec Corporation
11001 Hampshire Avenue S
Minneapolis, MN 55438
Phone: 952.995.2000
Fax: 952.995.2020
Web: braunintertec.com
February 21, 2025 Proposal QTB210666
David Swearingen, PE
City of Arden Hills
1245 West Highway 96
Arden Hills, MN 55112
Re: Proposal for a Geotechnical/Pavement Evaluation & Environmental Services
2026 PMP Street and Utility Improvements
Various Streets
Arden Hills, Minnesota
Dear Mr. Swearingen:
Braun Intertec Corporation appreciates the opportunity to submit this proposal to complete a
geotechnical/pavement evaluation and environmental services for the 2026 PMP Street and Utility
Improvements project in Arden Hills, Minnesota.
Project Information
We understand the City of Arden Hills is looking to rehabilitate the various street locations provided in
the pdf document by mill and overlay or full-depth reclamation (FDR). Associated site work is also to
include utility improvements where needed within the FDR areas, trail improvements within Cummings
Park, and environmental sediment sampling for Karth Lake.
Geotechnical/Pavement Scope of Services
We propose the following tasks to help achieve the stated purpose. If we encounter unfavorable or
unforeseen conditions during the completion of our tasks that lead us to recommend an expanded scope
of services, we will contact you to discuss the conditions before resuming our services.
Purpose
The purpose of our geotechnical evaluation will be to characterize subsurface geologic conditions at selected
exploration locations, evaluate their impact on the project, and provide geotechnical recommendations for
the design and construction of street rehabilitation using an assumed R-value, associated utility
improvements, and trail improvements.
Site Access
Based on aerial photographs, it appears that the site is accessible to a truck drill rig. We assume there will be
no cause for delays in accessing the exploration locations. We are not including debris or obstruction
removal, grading of navigable paths, or snow plowing.
City of Arden Hills
Proposal QTB210666
February 21, 2025
Page 2
Depending on access requirements, ground conditions or potential utility conflicts, our field crew may
alter the exploration locations from those proposed to facilitate accessibility.
Staking
We will stake prospective subsurface exploration locations and obtain surface elevations at those
locations using GPS (Global Positioning System) technology. For purposes of linking the GPS data to an
appropriate reference, we request that you provide CAD files indicating location/elevation references
appropriate for this project, or give us contact information for the consultant that might have such
information.
Utility Coordination
Prior to drilling or excavating, we will contact Gopher State One Call and arrange for notification of the
appropriate utility vendors to mark and clear the exploration locations of public underground utilities.
You, or your authorized representative, are responsible to notify us before we begin our work of the
presence and location of any underground objects or private utilities that are not the responsibility of
public agencies.
ROW Permit and Work Hours
We will obtain a right-of-way (ROW) permit through the City of Arden Hills (City) right-of-way department
prior to beginning our fieldwork. We assume the City will waive permit fees as we will be completing the
work for them. Prior to commencing with field work. We assume that the City will not require a work hour
restriction for this work (i.e., an 8:00 AM to 4:00 PM normal work hour will apply).
Pavement Coring
We propose to perform 23 pavement cores for the project.19 will be in road ROW (at our proposed
boring locations presented below) and 4 on the trail improvements. The coring will be performed with a
6-inch diamond-toothed core barrel fitted on a mechanically operated rotary drill. The coring will extend
down through the existing bituminous section. Upon completion of each core, we will extend a manually
operated hand auger through the aggregate base section to a depth of 2 to 4 feet into the underlying
subgrade. The thickness of the cores will be measured to the nearest 1/4-inch, and the aggregate base
will be measured to the nearest 1-inch (depending on the underlying soil type and past mixing of the
aggregate layer). If groundwater/frost is encountered, we will note their presence on the boring logs.
We will photograph the pavement cores and attach in a core photo log. The pavement cores will be
retained for up to 60 days, unless otherwise noted.
Figure 1 in our soil borings section shows the proposed pavement coring locations which includes the
trail locations.
Soil Borings
We propose to drill 19 standard penetration test (SPT) borings for the project to nominal depths of
10 feet below existing grade surface. We will perform standard penetration tests at 2 1/2-foot vertical
intervals to a depth of about 10 feet.
City of Arden Hills
Proposal QTB210666
February 21, 2025
Page 3
Figure 1 below shows an illustration of our proposed boring locations.
Figure 1. Proposed Boring Locations
Figure annotated in and extracted from Google Earth™.
If the intended boring depths do not extend through unsuitable material, we will extend the borings at
least 5 feet into suitable material at greater depths. The additional information will help evaluate such
issues as excavation depth. If we identify a need for deeper (or additional) borings, we will contact you
prior to increasing our total estimated drilled footage and submit a Change Order summarizing the
anticipated additional effort and the associated cost, for your review and authorization.
If the borings encounter groundwater during or immediately after drilling of each boring, we will record
the observed depth on the boring logs. We will not leave any of the boreholes open for an extended
period of time.
MDH Notification and Sealing Record
Since our planned exploration will be less than 15 feet in depth, the Minnesota Statutes will not require
that we complete any notifications or sealing records. If we extend any of the borings to a depth of 15 feet
or greater, the Statutes requires that we seal the boreholes and complete a Sealing Record. If 25 feet or
greater, the Statutes also require us to complete a Sealing Notification Form. If the Record or Form are
required, we will contact you to discuss the additional fees and sealing requirements.
City of Arden Hills
Proposal QTB210666
February 21, 2025
Page 4
Borehole Abandonment
We will backfill our exploration locations immediately after completing the drilling at each location.
Minnesota Statutes require sealing temporary borings that are 15 feet deep or deeper. Based on our
proposed subsurface characterization depths, we currently do not anticipate having to seal any of the
boreholes with grout. Upon backfilling or sealing exploration locations, we will fill holes in pavements
with a temporary bituminous cold patch.
Over time, subsidence of borehole (core) backfill may occur, requiring releveling of surface grades or
replacing bituminous or concrete patches. We are not assuming responsibility for re-leveling or re-
patching after we complete our fieldwork.
Sample Review and Laboratory Testing
We will return recovered samples to our laboratory, where a geotechnical engineer will visually classify
and log them. To help classify the materials encountered and estimate the engineering properties
necessary to our analyses, we have budgeted to perform the following laboratory tests.
Table 2. Laboratory Tests
Test Name
ASTM Test
Method Purpose
Moisture content D2216 Soil classification, moisture condition, and engineering properties
Atterberg limits D4318 Soil plasticity, shrink/swell potential, engineering parameters, suitability of
soils for reuse
Sieve analysis D1140 Soil classification
Percent passing
#200 sieve D1140 Soil classification, and evaluate frost susceptibility
Organic content D2974 Evaluate suitability of soils for reuse
We will determine the actual laboratory testing for the project depending on the encountered subsurface
conditions. If we identify a laboratory testing program that exceeds the budget included in this proposal
but provides additional value to the project, we will request authorization for the additional fees through
a Change Order.
Report
We will prepare a report including:
▪ A sketch showing the exploration locations.
▪ Logs of the borings describing the materials encountered and presenting the results of our
groundwater measurements and laboratory tests.
▪ A photographic pavement core and apparent aggregate base log.
▪ A summary of the subsurface profile and groundwater conditions.
City of Arden Hills
Proposal QTB210666
February 21, 2025
Page 5
▪ Discussion identifying the subsurface conditions that will impact design and construction.
▪ Discussion regarding the reuse of on-site materials during construction.
▪ Recommendations for preparing structure and pavement subgrades, and the selection,
placement and compaction of fill.
▪ Recommendations for the use in design and construction of the street rehabilitation using an
assumed R-value, and associated utility improvements.
We will only submit an electronic copy of our report to you unless you request otherwise. At your
request, we can also send the report to additional project team members.
Environmental Scope of Services
Sediment Sampling
Our scope is generally based on the Minnesota Pollution Control Agency’s current best management
practice (MPCA BMP) document (MPCA, 2024).
The sampling is proposed to be completed in foot-accessible locations around Karth Lake, either through
the ice or wading into the lake at sufficiently shallow locations. Note that if ice conditions are not thick
enough (including if ice has not fully receded from the lake edge in warmer conditions) to conduct the
work safely, the work may need to be postponed until conditions allow the safe completion of the work.
Additional costs may be incurred if more than one mobilization is required due to unsafe conditions.
Per your request, and in accordance with MPCA BMPs, we will collect one analytical sample from each
location provided. The sample will be collected by driving a push probe sampler into the underlying
sediment using hand-driven probe sampling equipment. The sample will be comprised of composites
from the 0- to 5-foot interval (or shorter interval that is appropriate based on the sediment thickness)
from up to three sampling probe locations.
For each probe advanced, soil sample textures will be evaluated by visual methods as the samples are
collected and noted in the field notes.
Drilling tools will be cleaned prior to and between sampling runs by washing the equipment with a brush
and water containing Alconox® and rinsing the equipment with water. Where hand-driven probe
samplers are used, a clean liner will be used for sample collection for each sample.
The samples will be transferred to clean laboratory-supplied containers, preserved in accordance with
Braun Intertec Standard Operating Procedures (SOPs) and transported to a certified environmental
laboratory for analysis. Chain of Custody will be initiated at the time of sampling and maintained
throughout the process.
City of Arden Hills
Proposal QTB210666
February 21, 2025
Page 6
Each of the sediment samples will be analyzed by the laboratory for the following baseline parameters as
listed in MPCA guidance:
▪ Metals – arsenic, cadmium, chromium III, chromium VI, copper, lead, mercury, nickel,
selenium, and zinc by SW-846 EPA 6010/7471B.
▪ Total phosphorus using method EPA 365.1.
▪ Nitrate & nitrite using EPA 353.2.
▪ Ammonia nitrogen using EPA 350.1.
▪ Total Kjeldahl nitrogen using EPA 351.2.
▪ Polychlorinated biphenyls (PCBs) using method SW-846 8082A.
▪ Total organic carbon using SW-846-9060.
▪ Extended List, Polycyclic Aromatic Hydrocarbons (PAHs) using EPA 8270E SIM.
For the purpose of this proposal, we assume 5 sediment samples will be submitted for chemical analysis.
Standard quality assurance/quality control (QA/QC) procedures will be used. The samples will be
analyzed within a turnaround time of approximately 10 working days.
Reporting
We will prepare a letter report describing our sampling goals, methodology, and results. Approximate
sampling locations will be plotted on aerial photographs. The laboratory data will be tabulated and the
tables provided to you along with the laboratory report(s). The MPCA dredge management levels for the
compounds will be included in the table and concentrations exceeding either of those values will be
highlighted.
Schedule
We anticipate performing our geotechnical and environmental work according to the following schedule.
▪ Drill rig mobilization – within 8 weeks following receipt of written authorization.
▪ Field exploration – 2 days on site to complete the soil borings and 2 days on site to complete
the pavement cores.
▪ Sediment sampling – 1 day on site to obtain the samples.
▪ Classification and laboratory testing – within 2 weeks after completion of field exploration.
City of Arden Hills
Proposal QTB210666
February 21, 2025
Page 7
▪ Sediment subcontract laboratory testing – typically within 2 weeks after field sampling.
▪ Preliminary results – within 2 weeks after completion of pavement coring and soil boring
field exploration; within 2 to 3 weeks after collection of sediment samples.
▪ Draft report submittal – within 3 weeks of after completion of field exploration.
▪ Final report submittal – within 5 days of receiving comments on the draft report and
depending on the complexity of the comments.
If we cannot complete our proposed scope of services according to this schedule due to circumstances
beyond our control, we may need to revise this proposal prior to completing the remaining tasks.
OPTIONAL – Ground Penetrating Radar
We understand that the streets are proposed to be rehabilitated via a mill and overlay or full-depth
reclamation (FDR). To help with filling in pavement section thicknesses between the proposed
boring/pavement core locations, we propose as an optional item, to perform ground penetrating radar
(GPR) prior to performing our borings and pavement cores.
The GPR testing would be proposed in both travel directions along the planned roadways. The GPR data
will provide a continuous estimate of pavement layer thicknesses along the roadways that is correlated to
the thickness of the physical pavement core samples to provide a more complete estimate of the overall
in-place. The GPR measurements obtained will be tied to GPS coordinates for mapping and reference
purposes.
An air-coupled GPR unit can be expected to penetrate approximately 2 feet under ideal conditions and is
capable of detecting differentiation between bituminous pavement layers and underlying aggregate base
layers if present. The GPR can take 4 to 5 measurements per linear foot, so for a 1-mile-long alignment it can
produce 20,000 to 25,000 thickness measurements for each direction of travel with the GPR. The GPR is a
very efficient way of collecting additional pavement thicknesses measurements for estimating purposes.
Fees
We will furnish the services described in this proposal for a lump sum fee of $34,725. Table 2 provides a
breakdown of the proposed fees.
If the optional ground penetrating radar scope of service is wanted, please elect the optional scope by
checking (electing) the box by the signature line.
City of Arden Hills
Proposal QTB210666
February 21, 2025
Page 8
Table 2. Proposed Fee Breakdown
Service Fee
Geotechnical/Pavement Scope of Services
Staking and Utility Coordination $ 2,300
Pavement Coring 4,810
Drilling 10,265
Sample Review & Laboratory Testing 3,140
Engineering & Reporting 4,145
Geotechnical/Pavement Subtotal $24,660
Environmental Services
Field Services $ 3,355
Subcontract Analytical Testing 4,550
Project Management and Reporting 2,160
Environmental Subtotal $10,065
Base Scope of Services Total $34,725
OPTIONAL – Ground Penetrating Radar $ 2,780
Base Scope with Optional Scope Total $37,505
Our work may extend over several invoicing periods. As such, we will submit partial progress invoices for
work we perform during each invoicing period.
General Remarks
We will be happy to meet with you to discuss our proposed scope of services further and clarify the
various scope components.
We appreciate the opportunity to present this proposal to you. Please sign and return a copy to us in its
entirety.
We based the proposed fee on the scope of services described and the assumptions that you will
authorize our services within 30 days and that others will not delay us beyond our proposed schedule.
City of Arden Hills
Proposal QTB210666
February 21, 2025
Page 9
We include the Braun Intertec General Conditions, which provide additional terms and are a part of our
agreement.
To have questions answered or schedule a time to meet and discuss our approach to this project further,
please contact Zach Semlak at 651.788.5071 (zsemlak@braunintertec.com) for geotechnical related
questions or Edward Pencak at 612.500.3752 (epencak@braunintertec.com) for environmental related
questions.
Sincerely,
BRAUN INTERTEC CORPORATION
Zachary T. Semlak, EIT Edward S. Pencak, PG
Staff Engineer Project Scientist
Matthew P. Ruble, PE Brian J. Hoese, PE
Vice President, Principal Engineer Director, Principal Engineer
Attachments:
General Conditions (11/4/2024)
c: Bradley Fisher, PE, Bolton & Menk, Inc.
The proposal is accepted, and you are authorized to proceed on the base scope of services. In addition,
the optional GPR has been checked (elected) and you are authorized to proceed on the optional scope.
☐ OPTIONAL – Ground Penetrating Radar: $2,780
Authorizer’s Firm
Authorizer’s Signature
Authorizer’s Name (please print or type)
Authorizer’s Title
Date
Braun Intertec General Conditions
Rev. 2024-11-04 Page 1 of 2
SECTION 1: AGREEMENT
1.1 Agreement. This agreement consists of these General Conditions and the accompanying
written proposal or authorization (“Agreement”). This Agreement is the entire agreement
between Consultant and Client and supersedes all prior negotiations, representations or
agreements, either written or oral.
1.2 Parties to the Agreement. The parties to this Agreement are the Braun Intertec entity
(“Consultant”) and the client (“Client”) as described in the accompanying written proposal
or authorization. Consultant and Client may be individually referred to as a Party or
collectively as the Parties.
SECTION 2: SCOPE OF SERVICES
2.1 Services. Consultant will provide services (“Services”) in connection with the project
(“Project”) which are specifically described in this Agreement. Client understands and agrees
that Consultant’s Services are limited to those which are expressly set forth in this
Agreement.
2.2 Additional Services. Any Services not specifically set forth in the Agreement constitute
“Additional Services.” Additional Services must be agreed upon in writing by the Parties prior
to performance of the Additional Services and may entitle Consultant to additional
compensation and schedule adjustments. Additional compensation will be based upon
Consultant’s then current rates and fees.
SECTION 3: PERFORMANCE OF SERVICES
3.1 Standard of Care. Consultant will perform its professional Services consistent with the
degree of care and skill exercised by members of Consultant’s profession performing under
similar circumstances at the same time and in the same locality in which the professional
Services are performed. CONSULTANT DISCLAIMS ALL STATUTORY, ORAL, WRITTEN,
EXPRESS, AND IMPLIED WARRANTIES, INCLUDING WARRANTIES OF MERCHANTABILITY,
FITNESS FOR A PARTICULAR PURPOSE, OR PERFORMANCE OF SERVICES IN A GOOD AND
WORKMANLIKE MANNER.
3.2 Written Reports and Findings. Unless otherwise agreed in writing, Consultant’s findings,
opinions, and recommendations will be provided to Client in writing and may be delivered
via electronic format. Client agrees not to rely on oral findings, opinions, or
recommendations.
3.3 Observation or Sampling Locations. Locations of field observations or sampling described
in Consultant’s report or shown on Consultant’s sketches reference Project plans or
information provided by others or estimates made by Consultant’s personnel. Consultant will
not survey, set, or check the accuracy of those points unless Consultant accepts that duty in
writing. Client agrees that such dimensions, depths, or elevations are approximations unless
specifically stated otherwise in the report. Client accepts the inherent risk that samples or
observations may not be representative of items not sampled or seen and further that site
conditions may vary over distance or change over time.
3.4 Project Site Information. Client will provide Consultant with prior environmental,
geotechnical and other reports, specifications, plans, and information to which Client has
access about the Project site and which are necessary for Consultant to carry out
Consultant’s Services. Client agrees to provide Consultant with all plans, changes in plans,
and new information as to Project site conditions until Consultant has completed its Services.
3.5 Subsurface Objects. To the extent required to carry out Consultant’s Services, Client
agrees to provide Consultant, in a timely manner, with information that Client has regarding
buried objects at the Project site. Consultant will not be responsible for locating buried
objects or utilities at the Project site unless expressly set forth in this Agreement, or expressly
required by applicable law. Client agrees to hold Consultant harmless, defend, and indemnify
Consultant from claims, damages, losses, penalties and expenses (including attorney fees)
involving buried objects or utilities that were not properly marked or identified or of which
Client had or should have had knowledge but did not timely notify Consultant or correctly
identify on the plans Client or others furnished to Consultant. Consultant, from time to time,
may hire a third party to locate underground objects or utilities and, unless otherwise
expressly stated in this Agreement, such action shall be for the sole benefit of Consultant
and in no way will alleviate Client of its responsibilities hereunder.
3.6 Hazardous Materials. Client will notify Consultant of any knowledge or suspicion of the
presence of hazardous or dangerous materials present on any Project site or in any sample
or material provided to Consultant. Client agrees to provide Consultant with information in
Client’s possession or control relating to such samples or materials. If Consultant observes
or suspects the presence of contaminants not anticipated in this Agreement, Consultant may
terminate Services without liability to Client or to others, and Client will compensate
Consultant for fees earned and expenses incurred up to the time of termination.
3.7 Supervision of Others. Consultant shall have no obligation to supervise or direct Client’s
representatives, contractors, or other third parties retained by Client. Consultant has no
authority over or responsibility for the means, methods, techniques, sequences, or
procedures of construction selected or used by Client, Client’s representatives, contractors,
or other third parties retained by Client.
3.8 Safety. Consultant will provide a health and safety program for its employees as well as
reasonable personal protective equipment (“PPE”) typical for the performance of the
Services provided by this Agreement and as required by law. Consultant shall be entitled to
compensation for all extraordinary PPE required by Client. Client will provide, at no cost to
Consultant, appropriate Project site safety measures which are necessary for Consultant to
perform its Services at the Project location or work areas in connection with the Project.
Consultant’s employees are expressly authorized by Client to refuse to work under
conditions that may, in an employee’s sole discretion, be unsafe. Consultant shall have no
authority over or be responsible for the safety precautions and programs, or for security, at
the Project site (except with respect to Consultant’s own Services and those of its
subconsultants).
3.9 Project Site Access and Damage. Client will provide or ensure access to the site. In the
performance of Services some Project site damage is normal even when due care is
exercised. Consultant will use reasonable care to minimize damage to the Project site. Unless
otherwise expressly stated in this Agreement, the cost of restoration for such damage has
not been included in the estimated fees and will be the responsibility of the Client.
3.10 Monitoring Wells. To the extent applicable to the Services, monitoring wells are Client’s
property, and Client is responsible for monitoring well permitting, maintenance, and
abandonment unless otherwise expressly set forth in this Agreement.
3.11 Contaminant Disclosures Required by Law. Client agrees to make all disclosures related
to the discovery or release of contaminants that are required by law. In the event Client does
not own the Project site, Client acknowledges that it is Client’s duty to inform the owner of
the Project site of the discovery or release of contaminants at the site. Client agrees to hold
Consultant harmless, defend, and indemnify Consultant from claims, damages, penalties, or
losses and expenses, including attorney fees, related to Client’s failure to make any
disclosure required by law or for failing to make the necessary disclosure to the owner of the
Project site.
SECTION 4: SCHEDULE
4.1 Schedule. Consultant shall complete its obligations within a reasonable time and shall
make decisions and carry out its responsibilities in a manner consistent with the Standard of
Care. Specific periods of time for rendering Services or specific dates by which Services are
to be completed are provided in this Agreement. If Consultant is delayed in the performance
of the Services by actions, inactions, or neglect of Client or others for whom Client is
responsible, by changes ordered in the Services, or by other causes beyond the control of
Consultant, including force majeure events, then the time for Consultant’s performance of
Services shall be extended and Consultant shall receive payment for all expenses attributable
to the delay in accordance with Consultant’s then current rates and fees.
4.2 Scheduling On‐Site Observations or Services. To the extent Consultant’s Services require
observations, inspections, or testing be performed at the Project site, Client understands and
agrees that Client, directly or indirectly through its authorized representative, has the sole
right and responsibility to determine and communicate to Consultant the scheduling of
observations, inspections, and testing performed by Consultant. Accordingly, Client also
acknowledges that Consultant bears no responsibility for damages that may result because
Consultant did not perform such observations, inspections, or testing that Client failed to
request and schedule. Client understands that the scheduling of observations, inspections,
or testing will dictate the time Consultant’s field personnel spend on the job site and agrees
to pay for all services provided by Consultant due to Client’s scheduling demands in
accordance with Consultant’s then current rates and fees.
SECTION 5: COST AND PAYMENT OF SERVICES
5.1 Cost Estimates. Consultant’s price or fees provided for in this Agreement are an estimate
and are not a fixed amount unless otherwise expressly stated in this Agreement. Consultant’s
estimated fees are based upon Consultant’s experience, knowledge, and professional
judgment as well as information available to Consultant at the time of this Agreement. Actual
costs may vary and are not guaranteed or warrantied.
5.2 Payment. Consultant will invoice Client on a monthly basis for Services performed. Client
will pay for Services as stated in this Agreement together with costs for Additional Services
or costs otherwise agreed to in writing within thirty (30) days of the invoice date. Unless
otherwise stated in this Agreement or agreed to in writing, Consultant’s costs for all services
performed will be based upon Consultant’s then current rates, fees, and charges. No
retainage shall be withheld by Client. All unpaid invoices will incur an interest charge of 1.5%
per month or the maximum allowed by law.
5.3 Other Payment Conditions. Consultant will require Client credit approval and Consultant
may require payment of a retainer fee. Client agrees to pay all applicable taxes. Client’s
obligation to pay for Services under this Agreement is not contingent on Client’s ability to
obtain financing, governmental or regulatory agency approval, permits, final adjudication of
any lawsuit, Client’s successful completion of any project, receipt of payment from a third
party, or any other event.
5.4 Third Party Payment. Provided Consultant has agreed in writing, Client may request
Consultant to invoice and receive payment from a third party for Consultant’s Services.
Consultant, in its sole discretion, may also require the third party to provide written
acceptance of all terms of this Agreement. Neither payment to Consultant by a third party
nor a third party’s written acceptance of all terms of this Agreement will alter Client’s rights
and responsibilities under this Agreement. Client expressly agrees that the Agreement
contains sufficient consideration notwithstanding Consultant being paid by a third party.
5.5 Non‐Payment. If Client does not pay for Services in full as agreed, Consultant may retain
work not yet delivered to Client and Client agrees to return all Project Data (as defined in this
Agreement) that may be in Client’s possession or under Client’s control. If Client fails to pay
Consultant in accordance with this Agreement, such nonpayment shall be considered a
Braun Intertec General Conditions
Rev. 2024-11-04 Page 2 of 2
default and breach of this Agreement for which Consultant may terminate for cause
consistent with the terms of this Agreement and without liability to Client or to others. Client
will compensate Consultant for fees earned and expenses incurred up to the time of
termination. Client agrees to be liable to Consultant for all costs and expenses Consultant
incurs in the collection of amounts invoiced but not paid, including but not limited to
attorney fees and costs.
SECTION 6: OWNERSHIP AND USE OF DATA
6.1 Ownership. All reports, notes, calculations, documents, and all other data prepared by
Consultant in the performance of the Services (“Project Data”) are instruments of
Consultant’s Services and are the property of Consultant. Consultant shall retain all common
law, statutory and other reserved rights, including the copyright thereto, of Project Data.
6.2 Use of Project Data. The Project Data of this Agreement is for the exclusive purpose
disclosed by Client and, unless agreed to in writing, for the exclusive use of Client. Client may
not use Project Data for a purpose for which the Project Data was not prepared without the
express written consent of Consultant. Consultant will not be responsible for any claims,
damages, or costs arising from the unauthorized use of any Project Data provided by
Consultant under this Agreement. Client agrees to hold harmless, defend and indemnify
Consultant from any and all claims, damages, losses, and expenses, including attorney fees,
arising out of such unauthorized use.
6.3 Samples, Field Data, and Contaminated Equipment. Samples and field data remaining
after tests are conducted, as well as field and laboratory equipment that cannot be
adequately cleansed of contaminants, are and continue to be the property of Client. Samples
may be discarded or returned to Client, at Consultant’s discretion, unless within fifteen (15)
days of the report date Client gives Consultant written direction to store or transfer the
samples and materials. Samples and materials will be stored at Client’s expense.
6.4 Data Provided by Client. Electronic data, reports, photographs, samples, and other
materials provided by Client or others may be discarded or returned to Client, at Consultant’s
discretion, unless within 15 days of the report date Client gives Consultant written direction
to store or transfer the materials at Client’s expense.
SECTION 7: INSURANCE
7.1 Insurance. Consultant shall keep and maintain the following insurance coverages:
a. Workers’ Compensation: Statutory
b. Employer’s Liability: $1,000,000 bodily injury, each accident | $1,000,000 bodily injury
by disease, each employee | $1,000,000 bodily injury/disease, aggregate
c. General Liability: $1,000,000 per occurrence | $2,000,000 aggregate
d. Automobile Liability: $1,000,000 combined single limit (bodily injury and property
damage)
e. Excess Umbrella Liability: $5,000,000 per occurrence | $5,000,000 aggregate
f. Professional Liability: $2,000,000 per claim | $2,000,000 aggregate
7.2 Waiver of Subrogation. Client and Consultant waive all claims and rights of subrogation
for losses arising out of causes of loss covered by the respective insurance policies.
7.3 Certificate of Insurance. Consultant shall furnish Client with a certificate of insurance
upon request.
SECTION 8: INDEMNIFICATION, CONSEQUENTIAL DAMAGES, LIABILITY LIMITS
8.1 Indemnification. Consultant’s only indemnification obligation shall be to indemnify and
hold harmless the Client, its officers, directors, and employees from and against those
damages and costs incurred by Client or that Client is legally obligated to pay as a result of
third party tort claims, including for the death or bodily injury to any person or for the
destruction or damage to any property, but only to the extent proven to be directly caused
by the negligent act, error, or omission of the Consultant or anyone for whom the Consultant
is legally responsible. This indemnification provision is subject to the Limitation of Liability
set forth in this Section 8.
8.2 Intellectual Property. Client agrees to indemnify Consultant against losses and costs
arising out of claims of patent or copyright infringement as to any process or system that is
specified or selected by Client or others on behalf of Client.
8.3 Mutual Waiver of Consequential Damages. NOTWITHSTANDING ANYTHING TO THE
CONTRARY HEREUNDER, NEITHER CONSULTANT NOR CLIENT SHALL BE LIABLE TO THE
OTHER FOR ANY CONSEQUENTIAL, PUNITIVE, INDIRECT, INCIDENTAL OR SPECIAL DAMAGES,
OR LOSS OF USE OR RENTAL, LOSS OF PROFIT, LOSS OF BUSINESS OPPORTUNITY, LOSS OF
PROFIT OR REVENUE OR COST OF FINANCING, OR OTHER SUCH SIMILAR AND RELATED
DAMAGE ASSERTED IN THIRD PARTY CLAIMS, OR CLAIMS BY EITHER PARTY AGAINST THE
OTHER.
8.4 Limitation of Liability. TO THE FULLEST EXTENT PERMITTED BY LAW, THE TOTAL LIABILITY
IN THE AGGREGATE OF CONSULTANT, CONSULTANT’S OFFICERS, DIRECTORS, PARTNERS,
EMPLOYEES, AGENTS, AND SUBCONSULTANTS, TO CLIENT AND ANYONE CLAIMING BY,
THROUGH OR UNDER CLIENT FOR ANY CLAIMS, LOSSES, COSTS, OR DAMAGES WHATSOEVER
ARISING OUT OF, RESULTING FROM OR IN ANY WAY RELATED CONSULTANT’S
PERFORMANCE OF THE SERVICES OR THIS AGREEMENT, FROM ANY CAUSE OR CAUSES,
INCLUDING BUT NOT LIMITED TO NEGLIGENCE, PROFESSIONAL ERRORS AND OMISSIONS,
STRICT LIABILITY, BREACH OF CONTRACT, INDEMNIFICATION OBLIGATIONS OR BREACH OF
WARRANTY, SHALL NOT EXCEED THE TOTAL COMPENSATION RECEIVED BY CONSULTANT OR
$50,000, WHICHEVER IS GREATER.
SECTION 9: MISCELLANEOUS PROVISIONS
9.1 Services Prior to Agreement. Directing Consultant to commence Services prior to
execution of this Agreement constitutes Client’s acceptance of this unaltered Agreement in
its entirety.
9.2 Confidentiality. To the extent Consultant receives Client information identified as
confidential, Consultant will not disclose that information to third parties without Client
consent. Additionally, any Project Data prepared in performance of the Services will remain
confidential and Consultant will not release the reports to any third parties not involved in
the Project. Neither of the aforesaid confidentiality obligations shall apply to any information
in the public domain, information lawfully acquired from others on a nonconfidential basis,
or information that Consultant is required by law to disclose.
9.3 Relationship of the Parties. Consultant will perform Services under this Agreement as an
independent contractor, and its employees will at all times be under its sole discretion and
control. No provision in this Agreement shall be deemed or construed to create a joint
venture, partnership, agency or other such association between the Parties.
9.4 Resource Conservation and Recovery Act. To the extent applicable to the Services,
neither this Agreement nor the providing of Services will operate to make Consultant an
owner, operator, generator, transporter, treater, storer, or a disposal facility within the
meaning of the Resource Conservation and Recovery Act, as amended, or within the meaning
of any other law governing the handling, treatment, storage, or disposal of hazardous
substances. Client agrees to hold Consultant harmless, defend, and indemnify Consultant
from any claims, damages, penalties or losses resulting from the storage, removal, hauling
or disposal of such substances.
9.5 Services in Connection with Legal Proceedings. Client agrees to compensate Consultant
in accordance with its then current fees, rates, or charges if Consultant is asked or required
to respond to legal process arising out of a proceeding related to the Project and as to which
Consultant is not a party.
9.6 Assignment. This Agreement may not be assigned by Consultant or Client without the
prior written consent of the other Party, which consent shall not be unreasonably withheld.
9.7 Third Party Beneficiaries. Nothing in this Agreement, express or implied, is intended, or
will be construed, to confer upon or give any person or entity other than Consultant and
Client, and their respective permitted successors and assigns, any rights, remedies, or
obligations under or by reason of this Agreement.
9.8 Termination. This Agreement may be terminated by either Party for cause upon seven
(7) days written notice to the other Party. Should the other Party fail to cure and perform in
accordance with the terms of this Agreement within such seven‐day period, the Agreement
may terminate at the sole discretion of the Party that provided the written notice. The Client
may terminate this Agreement for its convenience. If Client terminates for its convenience,
then Consultant shall be compensated in accordance with the terms hereof for Services
performed, reimbursable costs and expenses incurred prior to the termination, and
reasonable costs incurred as a result of the termination.
9.9 Force Majeure. Neither Party shall be liable for damages or deemed in default of this
Agreement to the extent that any delay or failure in the performance of its obligations (other
than the payment of money) results, without its fault or negligence, from any cause beyond
its reasonable control, including but not limited to acts of God, acts of civil or military
authority, embargoes, pandemics, epidemics, war, riots, insurrections, fires, explosions,
earthquakes, floods, adverse weather conditions, strikes or lock‐outs, declared states of
emergency, and changes in laws, statutes, regulations, or ordinances.
9.10 Disputes, Choice of Law, Venue. In the event of a dispute and prior to exercising rights
at law or under this Agreement, Consultant and Client agree to negotiate all disputes in good
faith for a period of 30 days from the date of notice of such dispute. This Agreement will be
governed by the laws and regulations of the state in which the Project is located and all
disputes and claims shall be heard in the state or federal courts for that state. Client and
Consultant each waive trial by jury.
9.11 Individual Liability. No officer or employee of Consultant, acting within the scope of
employment, shall have individual liability for any acts or omissions, and Client agrees not to
make a claim against any individual officers or employees of Consultant.
9.12 Severability. Should a court of law determine that any clause or section of this
Agreement is invalid, all other clauses or sections shall remain in effect.
9.13 Waiver. The failure of either Party hereto to exercise or enforce any right under this
Agreement shall not constitute a release or waiver of the subsequent exercise or
enforcement of such right.
9.14 Entire Agreement. The terms and conditions set forth herein constitute the entire
understanding of the Parties relating to the provision of Services by Consultant to Client. This
Agreement may be amended only by a written instrument signed by both Parties. In the
event Client issues a purchase order or other documentation to authorize Consultant’s
Services, any conflicting or additional terms of such documentation are expressly excluded
from this Agreement.
NAGELL APPRAISAL & CONSULTING
12805 Highway 55 Phone: 952-544-8966
Plymouth, MN 55441
Established in 1968 Fax: 952-544-8969
_______________________________________________________________________________________
Client: City of Arden Hills, David Swearingen February 15, 2025
C/O Brad Fisher, PE of Bolton & Menk
12224 Nicollet Avenue
Burnsville, MN 55337-1649
RE: A Restricted Appraisal Letter Report special benefit if any for street improvements for
2026 PMP – Rehab Type, Arden Hills.
Dear Brad:
Thank you for your interest in obtaining services regarding the project noted above. The following is an engagement
letter to provide a preliminary opinion of market benefit if any to the properties in the projects noted.
Report Use: The letter report is for the sole internal use of the City only, and is to assist the City for guidance regarding
special assessment determination for the proposed improvement project for properties abutting the streets. Should
an owner(s) appeal the assessment amount, a standard narrative appraisal report would be needed for District Court,
which would involve a separate fee.
Value Type: This would be a restricted appraisal letter report, it provides a preliminary general range of market benefit
if any for properties like those on along the subject streets.
Project Description:
1. Project mill and overlay and full depth reclamation. See map below.
Properties Types in the Project (see below and attached):
Residential and industrial (by Boston Scientific
Contact for access, Not necessary.
Scope of Report: Driveby viewing of the subject road and properties. (2) Note the physical and/or economic factors
that could affect the properties. (3) Comment on market benefit if any based on observations of the market. (4) Provide
a general range of benefit if any for properties in the project. Given the scope of the assignment, supporting data is
retained in the appraiser files. Ethan Waytas, MAI, Certified General 40368613 to co -sign the letter and testify if
needed.
Report Format: A Letter report will be provided. Supporting data retained in the appraisers workfile.
Fee: The fee is $1,600 total . Any meetings, owner contact, appraisal reports, any discovery, preparation and testifying
would be extra and billed at $200 per hour. The client named above is responsible for payment in a timely manner.
Due Date: Report can be completed in about 4 weeks from engagement.
Information needed by the appraiser: Feasibility report.
Page 2
Our Company: Our company has 11 employees and has been in business since 1968 and has sufficient knowledge,
experience, education, contacts and resources to competently complete this assignment. Our services will be delivered
in a manner that is independent, impartial, and objective. We do not warrant the outcome of this matter, and neither
the amount nor payment of our fees is contingent on any result.
NOTE: If you agree to the above terms, please sign below and return by email or mail.
If you have any additional questions, please do not hesitate to contact me.
Sincerely,
Signature______________________________
William R. Waytas David Swearingen
Certified General 4000813, MN
Date__________________________________
Enclosed:
Project Area Map
______________________________________________________________________________
www.nagellmn.com
Page 1 of 2
CONSENT ITEM – 8K
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: David Swearingen, P.E. Public Works Director / City Engineer
SUBJECT: 2025 Ramsey County, MN Hazard Mitigation Plan
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
Motions to approve, table, or deny the following:
• Resolution 2025-026 adopting and supporting the 2025 Ramsey County, MN Hazard
Mitigation Plan.
Background/Discussion
A hazard mitigation plan is a federally required document under the Disaster Mitigation Act of
2000 (DMA 2000). This law mandates that all states, counties, and communities maintain an
approved mitigation plan to be eligible for certain federal disaster assistance. This plan ensures
Arden Hills’ eligibility for federal disaster mitigation funding while proactively addressing risks
to enhance our community’s resilience.
The 2025 Ramsey County, MN Hazard Mitigation Plan (HMP) is updated approximately every
five years in accordance with DMA 2000 to use the most recent demographic data, identify
priority hazards and mitigation strategies, and evaluate critical infrastructure risks and hazards
affecting Ramsey County, including Arden Hills. It serves as a framework upon which hazard
mitigation projects and strategies can be coordinated across the entire county, and the process
ensures that all jurisdictions consider new and emerging hazards, the impacts of growth,
development, and social vulnerability on hazards in our area, and considers the impact of real-
world events.
The revised HMP assesses and ranks major natural, technological, and human-caused hazards
based on factors such as frequency of occurrence, economic impact, and potential for deaths and
injuries. Mitigation recommendations are based on input from state and local agencies, public
feedback, and national best practices. While the primary focus remains on evaluating Ramsey
Page 2 of 2
County’s exposure to natural hazards and identifying appropriate mitigation actions, this HMP
update also expands the scope to include technological and human-caused hazards and is crafted
in compliance with federal mitigation planning requirements.
The HMP is a truly multi-jurisdictional plan that applies to all of Ramsey County. In addition to
Arden Hills, this plan includes participation and input from Ramsey County and the
municipalities of Falcon Heights, Gem Lake, Lauderdale, Little Canada, Maplewood, Mounds
View, New Brighton, North Oaks, North Saint Paul, Roseville, Saint Anthony, Saint Paul,
Shoreview, Vadnais Heights, White Bear Lake, and White Bear Township. Each of these
municipalities will separately adopt the HMP as their own – meaning that the entire county will
now use a single assessment and planning methodology to better coordinate across jurisdictions.
Once approved by the Ramsey County and each municipality, the plan will be submitted by the
Minnesota Department of Homeland Security and Emergency Management to the Federal
Emergency Management Agency for final approval. Once approved as final adoption, Ramsey
County Emergency Management and Homeland Security will forward a copy of the letter to the
City’s Emergency Management Director.
Due to the size of the document, the full plan is attached to this agenda packet on the City’s
website* (2025 Ramsey County Multi-Hazard Mitigation Plan). Attachment B includes the
executive summary.
Budget Impact
N/A
Attachments
Attachment A: Resolution 2025-026
Attachment B: Executive Summary
*(see published packet in the website Agenda Center for the full plan)
Page 1 of 2
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2025-026
RESOLUTION ADOPTING THE RAMSEY COUNTY
MULTI-HAZARD MITIGATION PLAN
WHEREAS the City of Arden Hills has participated in the hazard mitigation planning
process as established under the Disaster Mitigation Act of 2000; and
WHEREAS, the Act establishes a framework for the development of a multi-jurisdictional
County Hazard Mitigation Plan; and
WHEREAS, the Act as part of the planning process requires public involvement and local
coordination among neighboring local units of government and businesses; and
WHEREAS, the Ramsey County Multi-Hazard Mitigation Plan includes a risk assessment
including past hazards, hazards that threaten Ramsey County, an estimate of structures at risk, a
general description of land uses and development trends; and
WHEREAS, the Ramsey County Multi-Hazard Mitigation Plan includes a mitigation strategy
including goals and objectives and an action plan identifying specific mitigation projects and costs;
and
WHEREAS, the Ramsey County Multi-Hazard Mitigation Plan includes a maintenance or
implementation process including plan updates, integration of the plan into other planning documents
and how Ramsey County will maintain public participation and coordination; and
WHEREAS, the Plan has been shared with the Minnesota Division of Homeland Security
and Emergency Management and the Federal Emergency Management Agency for review and
comment; and
WHEREAS, the Ramsey County Multi-Hazard Mitigation Plan will make the County and
participating jurisdictions eligible to receive FEMA hazard mitigation assistance grants; and
WHEREAS, this is a multi-jurisdictional Plan and cities that participated in the planning
process may choose to also adopt the County Plan.
Page 2 of 2
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN
HILLS, MINNESOTA, AS FOLLOWS:
1. The City of Arden Hills supports the hazard-mitigation planning effort and wishes to adopt
the Ramsey County Multi-Hazard Mitigation Plan.
ADOPTED this 10th day of March, 2025, by the City Council of the City of Arden Hills.
CITY OF ARDEN HILLS
By: ________________________________
David Grant, Mayor
ATTEST:
Julie Hanson, City Clerk
To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and
clicking on Archived Documents under Helpful Links on our main webpage.
Executive Summary: 2025 Ramsey County, MN Hazard Mitigation Plan
Introduction
The 2025 Ramsey County, MN Hazard Mitigation Plan (HMP) is a multi-jurisdictional initiative aimed at
reducing the long-term risks associated with natural, technological, and human-caused hazards. This plan
provides a strategic framework to enhance community resilience, minimize economic losses, and protect human
life and property. Developed in collaboration with local jurisdictions and stakeholders, the HMP aligns with
federal and state mitigation planning requirements.
Goals and Objectives
The plan establishes four primary goals:
1. Mitigate impacts to life, property, the economy, and the environment from natural, technological, and
human-caused hazards.
2. Strengthen local capacity and resources to create resilience against these hazards.
3. Enhance the resilience of critical infrastructure and community systems to withstand disruptions.
4. Increase public awareness and engagement through education and outreach.
Planning Process
The plan was developed with extensive community participation, including:
• Collaboration between Ramsey County, all 16 municipalities and one township.
• Formation of a Local Planning Team (LPT) comprised of emergency management officials, city
administrators, fire chiefs, and law enforcement personnel.
• Public engagement via surveys and stakeholder outreach to ensure inclusivity, particularly for
vulnerable and traditionally underserved populations.
• Regular virtual planning meetings and assessments of past mitigation actions.
Community Profile
Ramsey County is Minnesota's second-most populous county, with a population exceeding 550,000 residents. It
has a diverse economy, dense urban development, and a variety of natural features, including lakes, rivers, and
parks. The county faces climate change risks, with increasing temperatures, heavier precipitation, and more
frequent extreme weather events.
Risk Assessment
A comprehensive risk assessment was conducted to identify and rank hazards based on threat level,
vulnerability, and potential consequences. The key hazards identified include:
• High-Risk Hazards:
o Tornadoes and windstorms
o Summer weather hazards (e.g., extreme heat, severe storms)
o Winter weather hazards (e.g., blizzards, ice storms)
• Medium-Risk Hazards:
o Flooding
o Drought
o Hazardous materials incidents
o Infrastructure failure
o Human-caused hazards (e.g., cyberattacks, terrorism)
• Low-Risk Hazards:
o Geologic hazards (e.g., landslides, sinkholes)
o Dam/levee failure
The risk assessment also incorporated social vulnerability factors, highlighting the increased risks faced by low-
income populations, non-English speakers, elderly individuals, and people with disabilities.
Mitigation Strategy
The 2025 mitigation strategy builds on actions from the 2019 plan, with updates to reflect emerging risks. Key
actions include:
• Strengthening infrastructure resilience through flood mitigation projects, power grid improvements, and
stormwater management upgrades.
• Expanding emergency preparedness programs for vulnerable populations.
• Enhancing public alert systems and risk communication strategies.
• Integrating hazard mitigation into urban planning and land-use policies.
• Securing funding for resilience projects through federal, state, and local sources.
Each jurisdiction has committed to at least one new or ongoing mitigation action to address their specific risks.
Plan Implementation & Maintenance
The plan outlines an implementation framework with:
• Annual monitoring and evaluation of progress.
• Integration with local planning mechanisms, including zoning laws and emergency response plans.
• Continued public involvement through updates, community forums, and educational campaigns.
Conclusion
The 2025 Ramsey County Hazard Mitigation Plan is a proactive roadmap designed to safeguard communities
against future disasters. By fostering collaboration, securing resources, and enhancing resilience at all levels,
Ramsey County is committed to building a safer and more prepared future for its residents.
RAMSEY COUNTY, MN
HAZARD MITIGATION PLAN
2025
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan I
Ramsey County, MN
Hazard Mitigation Plan Update
2025
Developed by the communities of Ramsey County
In consultation with Tidal Basin Government Consulting
Cover Photo Credit: Lyndsay Hicken
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan II
Table of Contents
Table of Contents .......................................................................................................................................... II
1. Introduction and Planning Process ........................................................................................................... 1
1.1 Introduction ........................................................................................................................................ 1
1.2 Plan Goals and Objectives ................................................................................................................... 1
1.3 Plan Organization ................................................................................................................................ 1
1.4 Planning Process ................................................................................................................................. 2
2. Community Profile and Capabilities .......................................................................................................... 7
2.1 Introduction ........................................................................................................................................ 7
2.2 Geography and Topography ............................................................................................................... 7
2.3 Population and Demographics ............................................................................................................ 9
2.4 Social Vulnerability ............................................................................................................................ 11
2.5 Economy ............................................................................................................................................ 15
2.6 Community Services and Infrastructure ........................................................................................... 16
2.7 Critical Facilities ................................................................................................................................ 17
2.8 Land Use and Ownership .................................................................................................................. 18
2.9 Climate Change and Trends .............................................................................................................. 19
2.10 Community Capabilities Assessment .............................................................................................. 20
3. Risk Assessment ...................................................................................................................................... 26
3.1 Risk Assessment ................................................................................................................................ 26
3.2 Hazard Summary ............................................................................................................................... 26
3.3 Assessment Methodology ................................................................................................................. 28
3.4 Hazard Rankings ................................................................................................................................ 29
3.5 Community Hazard Rankings ............................................................................................................ 30
3.6 Dam/Levee Failure ............................................................................................................................ 31
3.7 Drought ............................................................................................................................................. 36
3.8 Floods ................................................................................................................................................ 42
3.9 Geologic Hazards ................................................................................................................................. 7
3.10 Hazardous Materials ....................................................................................................................... 14
3.11 Summer Weather Hazards .............................................................................................................. 20
3.12 Tornado and Windstorm ................................................................................................................. 29
3.13 Winter Weather Hazards ................................................................................................................ 36
3.14 Human-Caused Hazards .................................................................................................................. 44
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan III
3.15 Infrastructure Failure ...................................................................................................................... 50
4. Hazard Mitigation Strategy ..................................................................................................................... 58
4.1 Plan Goals .......................................................................................................................................... 58
4.2 Strategy Development ...................................................................................................................... 58
4.3 2019 Mitigation Action Reporting ..................................................................................................... 58
4.4 Completed Actions ............................................................................................................................ 59
4.5 Cancelled Actions .............................................................................................................................. 59
4.6 2025 Mitigation Strategy Elements .................................................................................................. 60
4.7 Action Prioritization .......................................................................................................................... 60
4.8 2025 Hazard Mitigation Strategy ...................................................................................................... 61
5. Plan Implementation and Maintenance ............................................................................................... 107
5.1 Plan Implementation ...................................................................................................................... 107
5.2 Monitoring, Evaluating and Updating the Plan ............................................................................... 108
Appendix A – Additional Emergency Management Actions ......................................................................... 1
Appendix B – Studies and References ........................................................................................................... 1
Appendix C – Sample Adoption .................................................................................................................... 1
Appendix D – Planning Process Documentation ........................................................................................... 1
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 1
1. Introduction and Planning Process
1.1 Introduction
Hazard mitigation is defined as any action taken before, during, or after a disaster to permanently
eliminate or reduce the long-term risk to human life and property. Hazard mitigation is crucial to a
comprehensive emergency management program, working alongside preparedness, response and
recovery efforts. This plan will help participating jurisdictions lower their risk to natural hazards and
enhance their resilience by identifying local policies and actions to reduce losses.
The 2025 Ramsey County Hazard Mitigation Plan (HMP) update provides a framework to enhance the
general well-being, safety and resilience of residents and communities across Ramsey County. This plan
considers the impact of natural hazards across the planning area, reviews current levels of capability
relevant to hazard mitigation, and identifies a comprehensive hazard mitigation strategy to buy down
levels of risk.
1.2 Plan Goals and Objectives
The planning process included a review and update of the prior mitigation goals and objectives as a basis
for the planning process and selection of appropriate mitigation actions addressing all hazards of
concern. Upon consideration, participating jurisdictions identified the follow goals for the plan update:
Goal 1. Mitigate impacts to life, property, the economy and the environment from natural, technological
and human-caused hazards.
Goal 2. Build and support local capacity to create resiliency from natural, technological and human-
caused hazards.
Goal 3. Build resilience for critical infrastructure and systems against impacts of natural, technological
and human-caused hazards.
Goal 4. Increase education, outreach and awareness to the whole community to build resiliency.
1.3 Plan Organization
The Ramsey County HMP update is organized as follows:
Section 1. Introduction and Planning Process. Overview of participants, planning process and
information regarding adoption of the HMP by Ramsey County and each participating jurisdiction.
Description of the HMP methodology and development process; Local Planning Team (LPT) and
stakeholder involvement efforts; and a description of how this HMP will be incorporated into existing
programs.
Section 2. Profile and Capability Assessment. Overview of Ramsey County, including: (1) physical
setting, (2) land use, (3) land use trends, (4) population and demographics, (5) general building stock and
(6) critical facilities and lifelines. A summary and description of the existing plans, programs and
regulatory mechanisms at all levels of government (federal, state, county, local) that support hazard
mitigation within the County.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 2
Section 3. Hazard Identification and Risk Assessment (HIRA). Documentation of the hazard
identification and hazard risk ranking process, hazard profiles, vulnerability assessment (estimates of the
impact of hazard events on life, safety, health, general building stock, critical facilities, the economy);
consequence assessment (consequences Ramsey County and its communities could reasonably expect
from an instance of the hazard including impacts on the public; responders; continuity of operations;
property, facilities, and infrastructure; environment; economy of the jurisdiction; and public confidence
in the jurisdiction’s governance); description of the status of local data; and planned steps to improve
local data to support mitigation planning.
Section 4. Mitigation Strategy. Information regarding the mitigation goals and objectives in response to
priority hazards of concern and the process by which Ramsey County and local mitigation strategies
have been developed or updated.
Section 5. Plan Maintenance Procedures. System established to continue to monitor, evaluate,
maintain, and update the HMP.
1.4 Planning Process
1.4.1 PARTICIPATING JURISDICTIONS
Table 1 shows all jurisdictions that were participants in the plan update.
Table 1. Participating Jurisdictions in the 2025 Update
Participating Jurisdictions
Arden Hills Falcon Heights Gem Lake
Lauderdale Little Canada Maplewood
Mounds View New Brighton North Oaks
North Saint Paul Roseville Saint Anthony
Saint Paul Shoreview Vadnais Heights
White Bear Lake White Bear Township Ramsey County
Each participating jurisdiction was asked to do the following:
• Actively participate in the planning process.
• Provide an update on the status of mitigation actions identified for that community in the 2019
plan.
• Provide an update on community capabilities.
• Identify at least one new or continuing hazard mitigation action in the updated 2025 hazard
mitigation strategy.
• Provide input throughout the process on plan elements.
• Support public participation in the process.
1.4.2 LOCAL PLANNING TEAM
To assist in the development of the plan update and provide guidance and community input on the
process, an LPT was convened to serve as community representatives in the process.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 3
Table 2. Local Planning Team
Last Name First Name Title Jurisdiction
Artig-Swomley Gretchen Mayor Gem Lake
Bownik Jim
Assistant to the City
Administrator Lauderdale
Brosnahan David Fire Chief Roseville
Butkowski Heather City Administrator Lauderdale
Christopherson Pat Town Administrator White Bear Township
Diaz Izzy Fire Chief St. Anthony
Freed Judd
Director of Emergency
Management and Homeland
Security Ramsey County
Hamdorf Trevor Deputy Director of Public Safety New Brighton
Hearden Chris Fire Chief Vadnais Heights
Lawrence Melissa Acting City Clerk Gem Lake
Linder Jim City Council Gem Lake
Linehan Jack City Administrator Falcon Heights
Lovas Mike EM Planning Coordinator St. Paul
Mayer Bryan
Emergency Management
Coordinator Ramsey County
Mallinger Jason Fire Chief North St. Paul
Minwegen Jen Office Assistant – Fire Division New Brighton
Montain Matt Assistant Fire Chief Mounds View
Peltier Paul Public Works Lead White Bear Township
Peterson Greg Fire Chief White Bear Lake
Richter Mike Assistant Fire Chief Vadnais Heights
Sather Matt
Assistant Fire Chief – Lake
Johanna Fire Arden Hills, North Oaks & Shoreview
Schroeder Ryan Assistant Fire Chief Maplewood
Sieben Terry
Emergency Management
Coordinator St. Paul
Smiley Don Fire Chief Little Canada
Zender Ben Chief of Police Mounds View
1.4.3 PUBLIC AND STAKEHOLDER OUTREACH
Public engagement is a key component to the HMP’s success. Public outreach was accomplished both at
the beginning and the end of the process. An electronic survey regarding hazard mitigation was released
on June 24, 2024, utilizing the web-based Microsoft Forms survey tool. The survey was advertised by the
County and jurisdictions within. A full accounting of advertising for the public survey is included in the
Planning Process Appendix to this plan.
Efforts were made by Ramsey County and participating jurisdictions to focus on including traditionally
underserved populations (TUP) into the planning effort. Partnerships between the County, the
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 4
communities, and TUPs were explored. Ramsey County is currently building in-roads with TUPs to
ensure that they can be a part of future planning processes. The plan was reviewed by a subject matter
expert in TUPs to identify ways in which the plan could be developed in a more inclusive manner,
resulting in substantive changes to the plan.
After completing the draft plan, it was opened for public review from December 9th, 2024, through
December 20th, 2024. The plan was posted for online access, and a comment tool was developed to
collect comments. Comments received were reviewed and integrated as appropriate.
Stakeholders are the individuals, agencies, and jurisdictions that have a vested interest in the
recommendations of the HMP, including all planning partners. The planning process prioritized
extensive representation from regional, county and local areas. Stakeholders were given a chance to
review the plan during the plan review process. Jurisdictional representatives for each participating
jurisdiction were also asked to serve as brokers to stakeholders within their own communities when
providing plan inputs.
Table 3. Stakeholders
Stakeholder M et ho d
Anoka County Emergency Management Plan review via direct email
Washington County Emergency Management Plan review via direct email
Dakota County Emergency Management Plan review via direct email
Hennepin County Emergency Management Plan review via direct email
1.4.4 PLANNING MEETINGS
Three large-group LPT planning meetings were held to support the planning process. All meetings were
held virtually, via Microsoft Teams.
Meeting #1 focused on introducing the planning process to the LPT and discussing reporting for
community capabilities and progress on 2019 HMP mitigation actions.
Meeting #2 focused on the initial results of the HIRA process.
Meeting #3 focused on community hazard mitigation strategy development.
Additionally, a series of informal mitigation strategy update support meetings were held virtually with
communities upon request to discuss potential ideas for hazard mitigation actions. The following
jurisdictions held additional community-specific meetings:
• North St. Paul September 10, 2024
• Vadnais Heights September 10, 2024
• Falcon Heights September 12, 2024
• Ramsey County September 12, 2024
1.4.5 COMMUNITY CAPABILITIES
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 5
Participating jurisdictions were provided the opportunity to identify community capabilities identified in
the previous plan; these capabilities were used as a baseline to identify areas upon which to build for
the hazard mitigation strategy. Communities reported on capabilities in the following target areas:
• Planning and Regulatory
• Administrative and Technical
• Financial
• Education and Outreach
The outcome of the capability assessment surveys is summarized in Section 2.
1.4.6 HAZARD IDENTIFICATION AND RISK ASSESSMENT
A risk assessment is a calculation of the threat, vulnerability, and consequence of hazards that impact
the participating jurisdictions in the planning area. While hazard mitigation lends itself to natural
hazards, Ramsey County included human-caused and technological hazards to develop a more holistic
understanding of risk. The following hazards were identified and assessed during the plan update
process:
• Dam/Levee Failure
• Drought
• Floods
• Geological Hazards (landslide, subsidence, and sinkholes)
• Hazardous Materials (Fixed Sites and In Transit)
• Summer Weather Hazards
• Tornado and Windstorm
• Winter Weather Hazards
• Human-Caused Hazards
• Infrastructure Failure
Following an initial evaluation of hazard risk, the LPT discussed the results during the second planning
meeting and added comment and context to the final assessment. Further information on the risk
assessment process can be found in Section 3.
1.4.7 HAZARD MITIGATION STRATEGY
The hazard mitigation strategy was structured in two phases. Initially, communities were provided a list
of the hazard mitigation actions from the 2019 HMP. Communities were asked to assess their progress,
employing a four-option status indicator to report updates:
• Not started
• In progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 6
• Completed
• Cancelled
Communities were also asked to provide background information on each action where applicable,
identifying:
• If an action was completed, when was it completed? Has the community seen any benefits from
the project?
• If an action has not been started, why not?
• If an action is in progress, how much progress has been made? When is the project slated for
completion?
• If an action is deleted, why?
This evaluation process enabled communities to establish a foundation of ongoing initiatives for the
revised hazard mitigation strategy. After completing the HIRA, the LPT focus shifted to developing new
hazard mitigation actions to enhance the 2025 strategy. Communities received instructions on creating
these new actions, and what supporting information would be necessary for each action included in the
plan. Customized planning support meetings were available for communities that requested additional
engagement in developing mitigation strategies. These efforts are reflected in Section 4.
1.4.8 PLAN IMPLEMENTATION AND MAINTENANCE
The LPT developed a plan for HMP implementation and maintenance, including annual review and
evaluation, integration with other planning mechanisms and continued public involvement. This
information can be found in Section 5.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 7
2. Community Profile and Capabilities
2.1 Introduction
Established in 1849, Ramsey County is the second-most populous county in the state and the smallest by
land area in Minnesota, covering approximately 170 square miles. Its dense urban core gives it a vibrant
economy and diverse population, estimated at 536,075 in 2023.
The county encompasses several cities, including Arden Hills, Blaine, Falcon Heights, Gem Lake,
Lauderdale, Little Canada, Maplewood, Mounds View, New Brighton, North Oaks, North Saint Paul,
Roseville, St. Anthony, Saint Paul, Shoreview, Spring Lake Park, Vadnais Heights, and White Bear Lake.
White Bear Township is the only township in Ramsey County. Ramsey County’s economy is diverse, with
a mix of public sector, healthcare, education, and service industries forming the backbone. Major
employers include state government, major healthcare systems, and higher education institutions.
Unemployment rates in the county have remained relatively low in recent years, though like many
urban areas, some neighborhoods experience higher rates due to economic disparities.
2.2 Geography and Topography
Ramsey County is anchored by its largest city and the state capital, Saint Paul, which forms part of the
Twin Cities along with neighboring Minneapolis. The Mississippi River runs along the western boundary
of the county, significantly shaping its topography and land use. Despite its urban nature, Ramsey
County boasts an extensive park system, with over 6,500 acres of parkland, including lakes, trails, and
natural reserves. It is bordered by four counties: Hennepin to the west, Dakota to the south, Washington
to the east, and Anoka to the north.
Ramsey County, Minnesota, has a relatively flat to gently rolling topography, typical of much of the
Upper Midwest. Key features of the county's landscape include:
• Low Elevation: The county sits at an average elevation of around 700-1,000 feet above sea level.
The terrain is generally flat to gently undulating, with no significant mountain ranges or
dramatic elevation changes.
• Lakes and Waterways: Ramsey County is home to several lakes, wetlands, and rivers. The
Mississippi River forms part of the county's western boundary and is a major geographical
feature. Other notable bodies of water include Lake Phalen, Lake Como, and White Bear Lake
(partly located in Ramsey County). These water features are integrated into the local landscape,
providing natural beauty and recreation.
• Glacial Influence: The topography of Ramsey County, like much of Minnesota, was shaped by
glacial activity during the last ice age. The landscape includes remnants of glacial drift and
moraine, resulting in the formation of lakes, wetlands, and gently rolling hills.
• Urban Development: As the county is heavily urbanized, particularly in Saint Paul and
surrounding areas, much of the natural topography has been altered by development. Parks,
green spaces, and lakes offer glimpses of the region’s natural terrain.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 8
2.2.1 GEOGRAPHY
Ramsey County is largely characterized by gently rolling terrain typical of the central lowland region,
with areas of flat plains and gradual elevation changes.
• Elevation: The elevation in Ramsey County ranges from around 690 feet above sea level near
the Mississippi River to approximately 1,100 feet in some of the county’s highest points.
• Highest Point: The highest natural point in Ramsey County is located near Indian Mounds Park
in Saint Paul, offering scenic views of the Mississippi River Valley.
• River Valleys: The Mississippi River Valley provides some of the most dramatic changes in
elevation in the county. Bluffs and steep slopes are found along the riverbanks, particularly in
the western portion of the county.
2.2.2 HYDROLOGY
Despite being an urban county, Ramsey County has numerous water features that play an important
role in its geography and landscape, with approximately 10% of the county’s total area being surface
water.
• Groundwater: Groundwater is the water found beneath the earth's surface, stored in and
moving through small spaces within soil, rocks, and geologic formations. In Ramsey County, a
section of a large geologic basin, made up of several aquifer units, lies underground and supplies
much of the water used for daily needs. Wells are used to extract groundwater from these
aquifers, which is then utilized for drinking, heating and cooling, irrigation, manufacturing, and
other purposes. Groundwater quality is influenced by its natural properties and any
contaminants introduced into the aquifers, either naturally or through human activity.
Approximately 15-20% of Ramsey County residents rely exclusively on groundwater for their
drinking water.
• Rivers:
o The Mississippi River forms part of the western boundary and is the most significant
water feature. Historically, it has been a key transportation route and continues to play
a major role in commerce and recreation.
o The Minnesota River joins the Mississippi just south of Ramsey County.
• Lakes: There are over 80 lakes in Ramsey County. Prominent lakes include:
o Lake Phalen: One of the largest lakes in the county and a popular recreational
destination.
o Como Lake: Located in Saint Paul’s Como Park, this is an urban lake with surrounding
parkland.
o White Bear Lake: Part of this large lake lies within Ramsey County, although most of it is
in neighboring Washington County. It is a recreational hub and supports suburban
communities.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 9
• Wetlands: The county has numerous wetlands that contribute to its diverse ecology, including
areas near Battle Creek Regional Park and Rice Creek. Wetland areas are critical for stormwater
management, wildlife habitats, and maintaining biodiversity in this urban landscape.
• Watershed Districts: There are five watershed districts and three water management
organizations within the county. The five districts are Capitol Region Watershed District, Lower
Minnesota River Watershed District, Ramsey-Washington Metro Watershed District, Rice Creek
Watershed District, and Valley Branch Watershed District. The water management organizations
are Lower Mississippi River Water Management Organization, Mississippi Water Management
Organization, and Vadnais Lake Area Water Management Organization.
2.2.3 GEOLOGY
Ramsey County has a diverse geological history shaped by both glacial and ancient marine processes.
The landscape was heavily influenced by the Wisconsin Glaciation, which left behind glacial deposits,
moraines, and outwash plains, forming the county's rolling terrain and contributing to the development
of the Mississippi River. Beneath the glacial sediments, the bedrock consists primarily of sedimentary
rocks like limestone, dolostone, and sandstone, deposited when the area was covered by shallow seas
around 500 million years ago. The Mississippi River has carved valleys into these rock layers, exposing
bluffs, while fertile soils from glacial deposits historically supported agriculture. Additionally, karst
features are present in some areas due to the soluble limestone bedrock, although these are less
common than in southeastern Minnesota.
2.3 Population and Demographics
Demographic Overview
Ramsey County is home to a diverse population that reflects a rich tapestry of racial, ethnic, and cultural
groups. Understanding the demographic makeup of the county is critical to ensuring that hazard
mitigation efforts are equitable and address the needs of all community members.
Population Composition
As of the most recent U.S. Census, Ramsey County has a population of 552,352 residents. Figure 1 shows
Ramsey population density by U.S. Census block.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 10
Figure 1. Ramsey County Population by Census Block
The racial and ethnic composition of the county is as follows:
• White: 59.6%
• Black or African American: 12.9%
• Hispanic or Latino: 8.2%
• Asian: 15.6%
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 11
• Native American or Alaska Native: 0.8%
• Other: 2.9%
Minnesota is a designated refugee settlement area, and the county's diverse population includes
significant immigrant communities. In 2018, the largest groups of foreign-born Minnesotans were born
in Mexico (about 64,500); Somalia (33,500); India (30,200); Laos, including Hmong (24,400); Vietnam
(18,600); China, excluding Hong Kong and Taiwan (18,600); Ethiopia (21,900); and Thailand, including
Hmong (18,500). These estimates do not include U.S.-born children of these immigrants. They also likely
underestimate the size of our immigrant populations because trust and language issues reduce response
rates to Census surveys. Fifty-one percent of Minnesota's foreign-born population are naturalized U.S.
citizens.
Age Distribution
The age distribution in Ramsey County reflects both a growing youth population and an aging
community, with a median age of 36.4, slightly younger than the state median age of 39.1:
• 17 years and younger: 23.1%
• 18-24 years: 9.6%
• 25-34 years: 16.2%
• 35-44 years: 13.1%
• 45-54 years: 10.9%
• 55-64 years: 11.9%
• 65 years and older: 15.1%
Understanding the composition, geographical distribution, and capability considerations of these diverse
populations is essential, as these groups traditionally have heightened vulnerabilities before, during and
after hazard events, particularly young children, the elderly, people with disabilities and serious health
conditions, people who are socially isolated, and households with limited English proficiencies.
2.4 Social Vulnerability
The Social Vulnerability Index (SVI) is a critical tool used to assess the resilience of communities in the
face of hazards. The SVI measures various factors that influence a community’s ability to prepare for,
respond to, and recover from disasters. In Ramsey County, these factors are essential for identifying
populations that may be disproportionately affected by natural and human-made hazards.
According to the latest SVI data, Ramsey County has an overall SVI score of 0.9419 (from a range of 0 to
1), indicating that the county’s vulnerability level is high compared to other counties across the country.
Higher SVI scores reflect greater social vulnerability, which can increase the risks associated with hazard
events.
Disparities that persist in society, including social, economic, and health inequities, and which have
impacted the historically disadvantages and underserved populations throughout the County, can be
exacerbated by the impacts of extreme weather events. Periods of extreme heat, winter storms or
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 12
floods can cause increases in utilities and other expenses that are not easily absorbed by low-income
families. Additionally, low-income communities and communities of color are the most vulnerable to a
rapidly changing climate.
2.4.1 SOCIOECONOMIC STATUS
Socioeconomic status affects hazard vulnerability because lower-income populations often have limited
access to resources, such as safe housing, insurance, and emergency services, making them less resilient
to disasters. Additionally, they may face greater challenges in recovery, prolonging the impacts of
hazards.
• The percentage of residents living below the poverty line in Ramsey County is 12.9 %.
• Unemployment rates stand at 4.6%, with certain areas of the county experiencing even higher
levels of joblessness.
• Household income in more vulnerable areas of the county is significantly lower than the
countywide average, with 20.5% of countywide households reporting incomes of $35,000 or
less.
• Housing cost-burdened occupied units (30%+ of income spent on housing costs) equal
approximately 26.4% of the available housing stock.
• Data shows that educational attainment also plays a role, with 8.8% of residents over age 25
lacking a high school diploma.
• In the metro area, 4 of every 5 Areas of Concentrated Poverty are also census tracts where at
least half of residents are people of color.
Areas with lower income, more poverty and unemployment, and fewer adults with high school diplomas
have a higher vulnerability score. Areas of moderate to high vulnerability are found along and north of I-
94, Saint Paul’s East and West Sides, and in areas in Roseville and Mounds View.
2.4.2 HOUSEHOLD COMPOSITION AND DISABILITY
The U.S. Census defines four major categories of disabilities:
• Sensory disabilities include blindness, deafness, or severe vision or hearing impairment.
• Physical disabilities are long-lasting conditions that substantially limit one or more basic physical
activities, such as walking, climbing stairs, reaching, lifting, or carrying things.
• Self-care disabilities are conditions lasting six or more months that make it a challenge to dress,
bathe, or move around inside the home.
• Go-outside-the-home disabilities are conditions lasting six or more months that make it difficult
for people to shop or to visit a doctor’s office by themselves.
Household composition and disability affect hazard vulnerability as families with young children, elderly
members, or individuals with disabilities may face greater difficulties in evacuating, accessing emergency
information, and receiving appropriate care during disasters. These groups often require additional
support and tailored resources to ensure safety and resilience.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 13
• Vulnerability is also shaped by the composition of households in the county. Individuals under
the age of 18 make up 23.1% of the population, while individuals over the age of 65 represent
15.1%.
• Additionally, 12.0% of individuals in Ramsey County report having a disability, which can affect
the ability to prepare for, respond to and recover from disasters.
• Single-parent households account for 5.7% of all households in Ramsey County, a group that
may face heightened vulnerability due to resource constraints.
Areas with more elderly, youth, people with disabilities and single parent households with young
children have a higher vulnerability score. Areas of moderate to high vulnerability are found along &
north of I-94, Saint Paul’s East and West Sides, and in areas in Mounds View, New Brighton, Maplewood,
White Bear Lake, Roseville and Little Canada.
2.4.3 MINORITY STATUS AND LANGUAGE
Minority status and language barriers increase hazard vulnerability as marginalized communities may
face systemic discrimination, limited access to resources, and reduced trust in authorities. Language
barriers can hinder the ability to receive critical emergency information and access services. Limited
English proficiency can put individuals at higher risk because they might not be aware of or fully
understand evacuation orders and other warnings, instructions on how to access critical City services, or
other communication from first responders. This barrier exacerbates efforts for preparedness, increases
their risks during disasters, and prolongs the recovery process.
• Ramsey County is home to a diverse population, with 40.4% of residents identifying as a racial or
ethnic minority. These groups often face barriers to accessing resources and services during
emergencies.
• Language proficiency is a significant factor in vulnerability. Ramsey County has a significant
portion of the population with limited English proficiency. 23.5% of residents speak a language
other than English at home, with the most common languages being Asian and Pacific Island
languages (10.6%) and Spanish (5.3%). This may indicate potential communication challenges in
the event of an emergency.
Areas with more minorities and people age 5+ who speak English "less than well" have a higher
vulnerability score. Areas of moderate to high vulnerability are shown in areas along and north of I-94,
Saint Paul’s East and West sides, and in areas in Mounds View, Saint Anthony, Maplewood, Lauderdale,
Falcon Heights, and Little Canada.
2.4.4 HOUSING AND TRANSPORTATION
Housing and transportation affect hazard vulnerability because individuals in substandard housing or
densely populated areas are more likely to experience severe damage during disasters. Access to
affordable housing can be a challenge and disasters that result in property damage can further constrain
the housing market. For some low income or diverse populations, they may have only been able to
purchase homes in areas with increased hazard risk exposure as they have limited income or have
experienced issues with housing access due to historic discriminatory practices.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 14
Limited access to reliable transportation can hinder evacuation efforts and reduce the ability to access
emergency services or resources. The evacuation of people with disabilities and access and functional
needs poses additional requirements. Many people who are otherwise self-sufficient may have special
circumstances due to short-term issues such as physical or mental health issues, or have temporary
resource shortages (e.g., fuel, transportation).
• Housing instability is a concern in Ramsey County, with 41.0% of residents living in renter-
occupied units. Renters may have fewer resources to recover from hazard events and are often
more vulnerable to displacement.
• In terms of transportation, 9.7% of households do not have access to a vehicle, making
evacuation and accessing services more difficult in an emergency.
• The percentage of residents living in housing units with more than one occupant per room
(overcrowded conditions) is 4.0%, which may increase the spread of illness and reduce
resilience.
• The percentage of residents living in housing built in 1939 or earlier is 27.5%, increasing the
likelihood of damage during hazard events.
Areas with more multi-unit housing, mobile homes, crowded homes, homes with no vehicle access, and
institutionalized group quarters have a higher vulnerability score. Areas of moderate to high
vulnerability are found along and north of I-94, Saint Paul’s East and West sides, and in areas in Mounds
View, New Brighton, Saint Anthony, Maplewood, North Saint Paul, Lauderdale, Falcon Heights, Blaine,
White Bear Lake, Roseville, Vadnais Heights and Little Canada.
2.4.5 SPATIAL DISTRIBUTION OF VULNERABILITY
Centers for Disease Control (CDC)/Agency for Toxic Substances and Disease Registry (ATSDR) SVI data
shows that social vulnerability is not evenly distributed across Ramsey County. Certain areas have
notably higher SVI scores. These areas are more likely to experience compounded challenges during
disasters due to the concentration of vulnerable populations and limited resources.
An interactive, visual, spatial distribution by census tract of Ramsey County’s SVI by each of the four key
themes can be viewed at
https://www.arcgis.com/apps/MapSeries/index.html?appid=2bd18bc999dd452db6c680eba697f916.
2.4.6 HEALTH DISPARITIES
Health disparities play a significant role in shaping a community's vulnerability to hazards, as underlying
health conditions and unequal access to healthcare can hinder the ability to prepare for, respond to, and
recover from disasters. In Ramsey County, understanding these disparities is critical to ensuring that
mitigation strategies address the unique needs of all residents.
2.4.6.1 Chronic Health Conditions
Chronic health issues such as asthma, diabetes, heart disease, and respiratory conditions can exacerbate
the impacts of disasters, especially for populations with limited access to healthcare. Pre-existing and
underlying health conditions can elevate a heat event to a life-threatening situation. Those with less
disposable income are affected disproportionately due to the inability to provide safe shelter, air
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 15
conditioning, medical care, and quality foods, and are also least able to obtain information related to
extreme event risks and adaptation strategies.
In Ramsey County:
• The hospitalization rate for asthma among residents is 7.7 per 10,000, but among youth ages 5
to 19, the asthma hospitalization rate is much higher at 15.4 per 10,000. Asthma hospitalization
rates for children living in the Twin Cities metropolitan area are 67% higher than for children
living in Greater Minnesota.
• In 2016, the rate of death from diabetes in the county was 20.8 per 100,000. In a 2014 metro
survey, 13.9 percent of those from lower income households were diagnosed with diabetes,
compared to 5.4 percent of those from higher income households. That’s an 8.5 percentage
point gap between the two income groups. The same survey found that 15.8 percent of those
with only a high school education reported being told they had diabetes compared to 4.3
percent of those with bachelor’s degrees. That’s an 11.5 percentage point gap between the
groups.
• For 2012-2016, the five-year age adjusted rates for stroke deaths in Minnesota was 32.7 per
100,000 compared to a Ramsey rate of 39.6 per 100,000. During that same period, the five-year
age adjusted rates for heart disease deaths in Minnesota was 116.6 per 100,000 compared to a
Ramsey rate of 110. According to a 2014 survey in the Metro area, those with less education or
lower income have a much higher risk of coronary heart disease, strokes and heart attacks.
Among those with high school education, 12.1% report being diagnosed with heart disease
compared to 3.1% of those with a bachelor’s degree.
These chronic health conditions can increase the severity of harm experienced during events such as
poor air quality from wildfires, extreme heat, or power outages.
2.4.6.2 Healthcare Access and Insurance Coverage
Access to healthcare is a critical factor in resilience, as individuals without adequate healthcare are less
likely to receive the care they need during and after disasters. In Ramsey County:
• 5.1% of the population is uninsured.
• In Ramsey County in 2014, among adults 25 years or older that take prescription medications,
about 10 percent could not afford their prescriptions.
2.5 Economy
Overall, the county has a stable and diverse economy with public administration, education, healthcare,
and manufacturing as foundational pillars. According to the 2023 American Community Survey 1-Year
Estimate, the median household income in Ramsey County is $77,812, and the employment rate 67%,
with 63.6% working for private sector businesses. In comparison, the median household income for
Minnesota is $85,086.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 16
2.6 Community Services and Infrastructure
The following section offers an overview of community services and infrastructure in Ramsey County.
Community services include essential functions such as healthcare, public safety, and emergency
services. In terms of infrastructure, examples include the county's power utilities, water and sewer
systems, and its transportation network, which supports both public and private transit options.
2.6.1 HEALTH CARE PROVIDERS
Ramsey County has a robust healthcare system with a variety of providers, including major hospitals like
Regions Hospital, United Hospital, and M Health Fairview St. John’s Hospital. These facilities offer
services ranging from emergency care and surgery to mental health and specialized treatments. In
addition to large healthcare networks like HealthPartners and Allina Health, there are numerous clinics
providing primary and specialty care. The county also has an extensive network of long-term care
facilities, skilled nursing centers, and hospice services, supporting the elderly and those with chronic
health conditions or end-of-life care needs.
2.6.2 PUBLIC SAFETY
Ramsey County is served by a comprehensive network of public safety agencies, including police, fire,
and emergency medical services (EMS), to ensure the safety and well-being of its residents.
• Police Services: The primary law enforcement agency in the county is the Ramsey County
Sheriff's Office, which provides patrol, investigative services, and emergency response for
unincorporated areas and supports municipal police departments. Cities like Saint Paul and
Maplewood have their own police departments, with the Saint Paul Police Department being
the largest in the county, offering full-service law enforcement, including specialized units like
homicide, narcotics, and Special Weapons and Tactics (SWAT).
• Fire Services: Ramsey County’s fire protection is provided by municipal fire departments,
including the Saint Paul Fire Department, one of the largest and most comprehensive in the
region. These departments handle fire suppression, fire prevention, rescue operations, and
hazardous materials response. Many fire departments are integrated with EMS to provide rapid
emergency medical assistance.
• Emergency Medical Services: EMS in Ramsey County are primarily provided by agencies like
Allina Health EMS, Saint Paul Fire Department EMS, and other local first responders. These
services provide advanced life support (ALS) and basic life support (BLS) care in emergencies,
handling medical crises, accidents, and disasters.
2.6.3 UTILITIES
Ramsey County provides its residents with a comprehensive array of utility services, including water,
sewer, natural gas, and electricity, managed by various public and private entities.
2.6.3.1 Water and Sewer Services
Water services in Ramsey County are primarily managed by local municipalities. The City of Saint Paul
operates its own water utility, providing safe drinking water sourced from the Mississippi River and
treated at the Saint Paul Regional Water Services facility. The water system is regularly monitored to
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 17
ensure compliance with federal and state safety standards. Similarly, wastewater treatment is handled
by the Metropolitan Council, which manages a regional sewer system that collects and treats sewage
from multiple municipalities in the area, including Saint Paul and surrounding suburbs.
2.6.3.2 Natural Gas
Natural gas services in Ramsey County are primarily provided by Xcel Energy, which supplies natural gas
to homes and businesses throughout the region. Xcel Energy is responsible for the maintenance and
operation of gas pipelines, ensuring reliable delivery and adherence to safety regulations. The company
also offers programs aimed at energy efficiency and conservation.
2.6.3.3 Electricity
Xcel Energy also provides a significant portion of the county with electricity. The company offers various
programs, including renewable energy options, rebates for energy-efficient appliances, and initiatives to
help customers reduce their energy usage. Other utility providers in the area include Dakota Electric
Association and the City of Saint Paul, which offers electricity services to some residents.
2.6.3.4 Transportation
Comprehensive transportation infrastructure that encompasses an extensive network of roads,
highways, and public transit systems, which are crucial for the mobility of residents and the efficiency of
local commerce. The county manages approximately 250 miles of roads. Major highways such as I-94, I-
35W, and Highway 36 serve as key corridors for both local and regional traffic.
Public transit services in Ramsey County are provided by Metro Transit, which operates various bus
routes and light rail lines, including the upcoming Riverview Corridor streetcar line aimed at enhancing
connectivity between major areas like Downtown Saint Paul and the Mall of America. Additionally,
several Bus Rapid Transit (BRT) projects, such as the Rush Line and Gold Line, are planned to improve
access to surrounding communities.
Planned activities include expanding the capacity of major highways to accommodate growing traffic,
implementing the "All Abilities Transportation Network" to promote inclusivity in transportation, and
coordinating bike and pedestrian trails across the county. These initiatives align with the County's
strategic goal of developing a sustainable, efficient, and multimodal transportation system that meets
the needs of all residents.
2.7 Critical Facilities
Critical facilities are interspersed throughout Ramsey County. Figure 2 shows all fire stations, post
offices, schools, hospitals and airports in the county.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 18
Figure 2. Critical Facilities in Ramsey County
2.8 Land Use and Ownership
Ramsey County features a mix of urban, suburban, and natural land use. The county is heavily urbanized,
particularly in Saint Paul, which occupies much of the county's land. Residential, commercial, and
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 19
industrial zones dominate, with neighborhoods of single-family homes and high-density apartments,
along with business districts and manufacturing centers.
In terms of ownership, a significant portion of the land is privately owned, especially residential and
commercial properties. Public lands, managed by county and city authorities, include parks, government
buildings, and protected areas. The county has been actively balancing development with conservation
efforts, particularly in managing urban sprawl and preserving green spaces. There are approximately
229,000 housing units, with close to 60% as owner-occupied. Almost 90% of the housing units were built
prior to 2000.
2.9 Climate Change and Trends
Climate trends in Ramsey County, Minnesota, are reflective of broader regional patterns in the Upper
Midwest, which has been experiencing noticeable shifts due to climate change. Key trends, as reported
by the University of Minnesota’s Climate Adaptation Partnership and the Minnesota Department of
Natural Resources include:
• Rising Temperatures: Over the past few decades, Ramsey County has experienced a steady
increase in average annual temperatures. Warmer winters, with fewer extreme cold days, are a
prominent feature, though summers are also seeing more frequent heat waves. Ramsey County
has already observed an average annual temperature increase of 3.5 degrees F, with much of
this warming occurring during the coldest months of the year.
• Increased Precipitation: There has been a rise in annual precipitation, with heavier rainfall
events becoming more common. This trend is contributing to localized flooding and increased
stormwater management challenges in urban areas like Saint Paul. The region has experienced
an increase in annual precipitation of 4.1 inches, while statewide an increase of 3.3 inches
annually has been observed. By the end of the century, winter and spring precipitation are
expected to increase by 30%, as projected by the University of Minnesota’s Climate Adaptation
Partnership.
• Seasonal Shifts: Winters are becoming shorter and less severe, while springs and autumns are
extending. Snowfall patterns are shifting, with less frequent but more intense snowstorms,
followed by quicker melts. It has been observed that winters in Minnesota are warming
dramatically, and spring weather is arriving up to two weeks earlier than in the early 1900s.
Climate change is expected to continue altering the timing of the seasons in the future. Winters
are predicted to become shorter, warmer, and wetter, with an increase in both spring and heavy
precipitation. Summers are likely to grow longer and hotter, beginning earlier and extending
later into the year. The last freeze of spring is projected to occur increasingly earlier, while the
first freeze of fall will likely be delayed, further lengthening the growing season.
• More Extreme Weather Events: The region, including Ramsey County, has seen more intense
storms, such as thunderstorms, tornadoes, and flash flooding events. This is consistent with a
broader trend toward more frequent and severe extreme weather across the Midwest. For
example, the term “mega-rain” is used to describe when at least six inches of rain fall over an
area of at least 1,000 square miles. Since 1973, Minnesota has experienced 16 mega-rains, 11 of
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 20
those events have occurred since 2000, indicating a trend toward an increase in frequency and
intensity of heavy rainfall events.
2.10 Community Capabilities Assessment
Participating jurisdictions completed assessments of community capabilities, focusing on the following
capability areas:
• Planning and Regulatory
• Administrative and Technical
• Financial
• Education and Outreach
Assessment results were utilized by communities to identify both capability gaps and existing
capabilities that could be used to mitigate hazards. It is important to remember that the capabilities
assessment was not a test, and most communities had very valid reasons for having or not having
specific capabilities.
The following sections indicate specific capabilities in each community, as identified by that community.
2.10.1 PLANNING AND REGULATORY CAPABILITIES
Planning and regulatory capabilities include codes, ordinances, policies, laws, plans and programs that
guide growth and development. These capabilities can either support risk reduction or create areas that
are more vulnerable to disaster.
Table 4. Planning Capabilities in Ramsey County
Plans Ca
p
i
t
a
l
I
m
p
r
o
v
e
m
e
n
t
P
l
a
n
Cl
i
m
a
t
e
C
h
a
n
g
e
A
d
a
p
t
a
t
i
o
n
P
l
a
n
Co
m
m
u
n
i
t
y
W
i
l
d
f
i
r
e
P
r
o
t
e
c
t
i
o
n
P
l
a
n
Co
m
p
r
e
h
e
n
s
i
v
e
/
M
a
s
t
e
r
P
l
a
n
Co
n
t
i
n
u
i
t
y
o
f
O
p
e
r
a
t
i
o
n
s
P
l
a
n
Ec
o
n
o
m
i
c
D
e
v
e
l
o
p
m
e
n
t
P
l
a
n
La
n
d
U
s
e
P
l
a
n
Lo
c
a
l
E
m
e
r
g
e
n
c
y
O
p
e
r
a
t
i
o
n
s
P
l
a
n
St
o
r
m
w
a
t
e
r
M
a
n
a
g
e
m
e
n
t
P
l
a
n
Tr
a
n
s
p
o
r
t
a
t
i
o
n
P
l
a
n
Arden Hills • • • • • •
Falcon Heights • • • •
Gem Lake • • • •
Lauderdale • • • •
Little Canada • • • • • • • •
Maplewood • • • • • • • •
Mounds View • • • • • • • •
New Brighton • • • • • •
North Oaks • • • • • •
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 21
Plans Ca
p
i
t
a
l
I
m
p
r
o
v
e
m
e
n
t
P
l
a
n
Cl
i
m
a
t
e
C
h
a
n
g
e
A
d
a
p
t
a
t
i
o
n
P
l
a
n
Co
m
m
u
n
i
t
y
W
i
l
d
f
i
r
e
P
r
o
t
e
c
t
i
o
n
P
l
a
n
Co
m
p
r
e
h
e
n
s
i
v
e
/
M
a
s
t
e
r
P
l
a
n
Co
n
t
i
n
u
i
t
y
o
f
O
p
e
r
a
t
i
o
n
s
P
l
a
n
Ec
o
n
o
m
i
c
D
e
v
e
l
o
p
m
e
n
t
P
l
a
n
La
n
d
U
s
e
P
l
a
n
Lo
c
a
l
E
m
e
r
g
e
n
c
y
O
p
e
r
a
t
i
o
n
s
P
l
a
n
St
o
r
m
w
a
t
e
r
M
a
n
a
g
e
m
e
n
t
P
l
a
n
Tr
a
n
s
p
o
r
t
a
t
i
o
n
P
l
a
n
North Saint Paul • • • • •
Roseville • • • • •
Saint Anthony • • •
Saint Paul • • • • • • • • •
Shoreview • • • • • • • • •
Vadnais Heights • • • • • •
White Bear Lake • • • • •
White Bear Township • • • • • • • •
Ramsey County • • • • • • • •
Table 5. Regulatory Capabilities in Ramsey County
Land Use and Planning Ordinances La
n
d
A
c
q
u
i
s
i
t
i
o
n
Bu
i
l
d
i
n
g
C
o
d
e
Fl
o
o
d
I
n
s
u
r
a
n
c
e
R
a
t
e
Ma
p
s
(
F
I
R
M
S
)
Fl
o
o
d
p
l
a
i
n
O
r
d
i
n
a
n
c
e
Su
b
s
t
a
n
t
i
a
l
D
a
m
a
g
e
Pl
a
n
Na
t
u
r
a
l
H
a
z
a
r
d
-S
p
e
c
i
f
i
c
Or
d
i
n
a
n
c
e
s
Su
b
d
i
v
i
s
i
o
n
O
r
d
i
n
a
n
c
e
s
Zo
n
i
n
g
O
r
d
i
n
a
n
c
e
Arden Hills • • • • • • •
Falcon Heights • • • • •
Gem Lake • • • •
Lauderdale • • • • • •
Little Canada • • • • • • • •
Maplewood • • • • • • • •
Mounds View • • • • • • • •
New Brighton • • • • • •
North Oaks • • • • •
North Saint Paul • • • •
Roseville • • •
Saint Anthony • •
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 22
Land Use and Planning Ordinances La
n
d
A
c
q
u
i
s
i
t
i
o
n
Bu
i
l
d
i
n
g
C
o
d
e
Fl
o
o
d
I
n
s
u
r
a
n
c
e
R
a
t
e
Ma
p
s
(
F
I
R
M
S
)
Fl
o
o
d
p
l
a
i
n
O
r
d
i
n
a
n
c
e
Su
b
s
t
a
n
t
i
a
l
D
a
m
a
g
e
Pl
a
n
Na
t
u
r
a
l
H
a
z
a
r
d
-S
p
e
c
i
f
i
c
Or
d
i
n
a
n
c
e
s
Su
b
d
i
v
i
s
i
o
n
O
r
d
i
n
a
n
c
e
s
Zo
n
i
n
g
O
r
d
i
n
a
n
c
e
Saint Paul • • • • • • • •
Shoreview • • • • • • • •
Vadnais Heights • •
White Bear Lake • • • • •
White Bear Township • • • • • •
Ramsey County • •
2.10.2 ADMINISTRATIVE AND TECHNICAL CAPABILITIES
Administrative and technical capabilities include staff, skills and tools. These capabilities can be used for
mitigation planning and to carry out specific mitigation actions. They also include the ability to access,
coordinate and implement these resources effectively.
Table 6. Administrative and Technical Capabilities in Ramsey County
Administrative and Technical Capabilities Ch
i
e
f
B
u
i
l
d
i
n
g
O
f
f
i
c
i
a
l
Ci
v
i
l
E
n
g
i
n
e
e
r
Co
m
m
u
n
i
t
y
P
l
a
n
n
e
r
Em
e
r
g
e
n
c
y
M
a
n
a
g
e
r
Fl
o
o
d
p
l
a
i
n
A
d
m
i
n
i
s
t
r
a
t
o
r
GI
S
C
o
o
r
d
i
n
a
t
o
r
Pl
a
n
n
i
n
g
B
o
a
r
d
Zo
n
i
n
g
O
f
f
i
c
i
a
l
Gr
a
n
t
W
r
i
t
i
n
g
C
a
p
a
b
i
l
i
t
y
Ha
z
a
r
d
D
a
t
a
a
n
d
I
n
f
o
r
m
a
t
i
o
n
GI
S
A
n
a
l
y
s
i
s
Mu
t
u
a
l
A
i
d
A
g
r
e
e
m
e
n
t
s
Arden Hills • • • • • • • • • • •
Falcon Heights • • • • • • • •
Gem Lake • • • • • • •
Lauderdale • • • • • • • • •
Little Canada • • • • • • •
Maplewood • • • • • • • • • •
Mounds View • • • • • • • • • • • •
New Brighton • • • • • • • • •
North Oaks • • • • • • • • • • • •
North Saint Paul • • • • • • • • • • •
Roseville • • • • • • • • • •
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 23
Administrative and Technical Capabilities Ch
i
e
f
B
u
i
l
d
i
n
g
O
f
f
i
c
i
a
l
Ci
v
i
l
E
n
g
i
n
e
e
r
Co
m
m
u
n
i
t
y
P
l
a
n
n
e
r
Em
e
r
g
e
n
c
y
M
a
n
a
g
e
r
Fl
o
o
d
p
l
a
i
n
A
d
m
i
n
i
s
t
r
a
t
o
r
GI
S
C
o
o
r
d
i
n
a
t
o
r
Pl
a
n
n
i
n
g
B
o
a
r
d
Zo
n
i
n
g
O
f
f
i
c
i
a
l
Gr
a
n
t
W
r
i
t
i
n
g
C
a
p
a
b
i
l
i
t
y
Ha
z
a
r
d
D
a
t
a
a
n
d
I
n
f
o
r
m
a
t
i
o
n
GI
S
A
n
a
l
y
s
i
s
Mu
t
u
a
l
A
i
d
A
g
r
e
e
m
e
n
t
s
Saint Anthony • • • • • • •
Saint Paul • • • • • • • • • • • •
Shoreview • • • • • • • • • • • •
Vadnais Heights • • • • • • • •
White Bear Lake • • • • • • •
White Bear Township • • • • • • • • • •
Ramsey County • • • • • • • • •
2.10.3 FINANCIAL CAPABILITIES
Financial capabilities include resources to fund mitigation actions.
Table 7. Financial Capabilities in Ramsey County
Financial Capabilities Ca
p
i
t
a
l
I
m
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
F
u
n
d
i
n
g
Co
m
m
u
n
i
t
y
D
e
v
e
l
o
p
m
e
n
t
Bl
o
c
k
G
r
a
n
t
Fe
d
e
r
a
l
F
u
n
d
i
n
g
P
r
o
g
r
a
m
s
(N
o
n
-FE
M
A
)
Wa
t
e
r
,
G
a
s
,
S
e
w
e
r
o
r
El
e
c
t
r
i
c
F
e
e
s
Im
p
a
c
t
F
e
e
s
f
o
r
N
e
w
De
v
e
l
o
p
m
e
n
t
St
a
t
e
F
u
n
d
i
n
g
P
r
o
g
r
a
m
s
St
o
r
m
w
a
t
e
r
U
t
i
l
i
t
y
F
e
e
s
Arden Hills • • • • • • •
Falcon Heights • • • • • •
Gem Lake • • •
Lauderdale • • • • •
Little Canada • • • • • •
Maplewood • • • •
Mounds View • • • • •
New Brighton • • • • • •
North Oaks • • • • •
North Saint Paul • • • • • •
Roseville • • • • • •
Saint Anthony • • •
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 24
Financial Capabilities Ca
p
i
t
a
l
I
m
p
r
o
v
e
m
e
n
t
Pr
o
j
e
c
t
F
u
n
d
i
n
g
Co
m
m
u
n
i
t
y
D
e
v
e
l
o
p
m
e
n
t
Bl
o
c
k
G
r
a
n
t
Fe
d
e
r
a
l
F
u
n
d
i
n
g
P
r
o
g
r
a
m
s
(N
o
n
-FE
M
A
)
Wa
t
e
r
,
G
a
s
,
S
e
w
e
r
o
r
El
e
c
t
r
i
c
F
e
e
s
Im
p
a
c
t
F
e
e
s
f
o
r
N
e
w
De
v
e
l
o
p
m
e
n
t
St
a
t
e
F
u
n
d
i
n
g
P
r
o
g
r
a
m
s
St
o
r
m
w
a
t
e
r
U
t
i
l
i
t
y
F
e
e
s
Saint Paul • • • • • • •
Shoreview • • • • • • •
Vadnais Heights • • •
White Bear Lake •
White Bear Township • • • • •
Ramsey County
2.10.4 EDUCATION AND OUTREACH CAPABILITIES
Education and outreach capabilities include programs and methods that Ramsey County and its
communities can use to communicate about and encourage risk reduction.
Table 8. Education and Outreach Capabilities in Ramsey County
Education and Outreach Capability Co
m
m
u
n
i
t
y
N
e
w
s
l
e
t
t
e
r
s
Ha
z
a
r
d
A
w
a
r
e
n
e
s
s
P
r
o
g
r
a
m
s
Lo
c
a
l
N
e
w
s
Or
g
a
n
i
z
a
t
i
o
n
s
t
h
a
t
R
e
p
r
e
s
e
n
t
,
Ad
v
o
c
a
t
e
f
o
r
o
r
I
n
t
e
r
a
c
t
w
i
t
h
Un
d
e
r
s
e
r
v
e
d
a
n
d
V
u
l
n
e
r
a
b
l
e
Co
m
m
u
n
i
t
i
e
s
Lo
c
a
l
G
r
a
s
s
r
o
o
t
s
I
n
i
t
i
a
t
i
v
e
s
Ta
r
g
e
t
e
d
t
o
D
i
v
e
r
s
e
Po
p
u
l
a
t
i
o
n
s
a
t
R
i
s
k
So
c
i
a
l
M
e
d
i
a
Arden Hills • • • • •
Falcon Heights • • • •
Gem Lake • • • •
Lauderdale • • •
Little Canada • • • •
Maplewood • • • • • •
Mounds View • • • • • •
New Brighton • • • • • •
North Oaks • • • • •
North Saint Paul • • • • • •
Roseville • • • • • •
Saint Anthony • • • •
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 25
Education and Outreach Capability Co
m
m
u
n
i
t
y
N
e
w
s
l
e
t
t
e
r
s
Ha
z
a
r
d
A
w
a
r
e
n
e
s
s
P
r
o
g
r
a
m
s
Lo
c
a
l
N
e
w
s
Or
g
a
n
i
z
a
t
i
o
n
s
t
h
a
t
R
e
p
r
e
s
e
n
t
,
Ad
v
o
c
a
t
e
f
o
r
o
r
I
n
t
e
r
a
c
t
w
i
t
h
Un
d
e
r
s
e
r
v
e
d
a
n
d
V
u
l
n
e
r
a
b
l
e
Co
m
m
u
n
i
t
i
e
s
Lo
c
a
l
G
r
a
s
s
r
o
o
t
s
I
n
i
t
i
a
t
i
v
e
s
Ta
r
g
e
t
e
d
t
o
D
i
v
e
r
s
e
Po
p
u
l
a
t
i
o
n
s
a
t
R
i
s
k
So
c
i
a
l
M
e
d
i
a
Saint Paul • • • • • •
Shoreview • • • • • •
Vadnais Heights •
White Bear Lake • • • •
White Bear Township
Ramsey County • • •
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 26
3. Risk Assessment
3.1 Risk Assessment
A risk assessment is the process of measuring the potential loss of life, personal injury, and economic
and property damage resulting from identified hazards. It allows planning personnel to address and
reduce hazard impacts and emergency management personnel to establish early response priorities by
identifying potential hazards and vulnerable assets. Results of the risk assessment are used to inform
mitigation planning processes, including determining and prioritizing mitigation actions that reduce a
community’s risk to a specified hazard. Past, present, and future conditions must be evaluated to assess
risk most accurately for each jurisdiction. The Ramsey County risk assessment includes the following:
• Identification of hazards of concern that impact Ramsey County
• Methodology and tools used to conduct the risk assessment
• Hazard ranking
• Hazards of concern profiles and vulnerability assessment
3.2 Hazard Summary
3.2.1 IDENTIFICATION OF HAZARDS
Ramsey County considered a full range of natural hazards that could impact the planning area. Hazard
identification began with a review of the hazards assessed in the 2019 Ramsey County plan, the City of
Saint Paul Hazard Mitigation Plan, and the State of Minnesota Hazard Mitigation Plan. A total of eight
natural hazards and three human-caused hazards of concern were identified as significant hazards
affecting the entire planning area, to be addressed in this plan:
• Dam/Levee Failure
• Drought
• Floods
• Geologic Hazards
• Hazardous Materials
• Summer Weather Hazards
• Tornado and Windstorm
• Winter Weather Hazards
• Human-Caused Hazards
• Infrastructure Failure
3.2.2 RAMSEY COUNTY DISASTER DECLARATIONS
Table 9 lists FEMA declarations in Ramsey County.
Table 9. Disaster Declarations in Ramsey County
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 27
Ramsey County Disaster Declarations
Declaration Type Date Year
Declared
Incident
Type
Declaration Title Designated
Area
DR-80-MN DR 1957-06-22 1957 Flood Floods Statewide
DR-188-MN DR 1965-04-11 1965 Flood Flooding
Ramsey
(County)
DR-255-MN DR 1969-04-18 1969 Flood Flooding
Ramsey
(County)
EM-3013-MN EM 1976-06-17 1976 Drought Drought
Ramsey
(County)
FM-2018-MN FM 1976-09-08 1976 Fire Huntersville Statewide
FM-2023-MN FM 1976-09-11 1976 Fire Galvin Line Statewide
FM-2022-MN FM 1976-09-11 1976 Fire Little Swan Statewide
FM-2021-MN FM 1976-09-11 1976 Fire Tate Statewide
FM-2020-MN FM 1976-09-11 1976 Fire Tamarack Statewide
FM-2019-MN FM 1976-09-11 1976 Fire Tower Statewide
FM-2024-MN FM 1976-10-01 1977 Fire McGregor Fire Statewide
DR-560-MN DR 1978-07-08 1978
Severe
Storm
Severe Storms,
Flooding, Hail &
Tornadoes Ramsey
DR-797-MN DR 1987-08-06 1987
Severe
Storm
Severe Storms,
Tornadoes & Flooding Ramsey
DR-993-MN DR 1993-06-11 1993
Severe
Storm
Severe Storms,
Tornadoes & Flooding Ramsey
DR-1175-MN DR 1997-04-08 1997 Flood
Severe Flooding, High
Winds, Severe Storms Ramsey
DR-1187-MN DR 1997-08-25 1997
Severe
Storm
Severe Storms,
Tornadoes, High Winds,
Flooding Ramsey
DR-1225-MN DR 1998-06-23 1998 Tornado
Severe Storms, Straight
Line Winds, &
Tornadoes Ramsey
DR-1333-MN DR 2000-06-27 2000
Severe
Storm
Severe Storms and
Flooding Ramsey
DR-1370-MN DR 2001-05-16 2001 Flood
Severe Winter Storms,
Flooding, & Tornadoes Ramsey
EM-3242-MN EM 2005-09-13 2005 Hurricane
Hurricane Katrina
Evacuation Ramsey
EM-3310-MN EM 2010-03-19 2010 Flood Flooding Ramsey
DR-1900-MN DR 2010-04-19 2010 Flood Flooding Ramsey
DR-1982-MN DR 2011-05-10 2011 Flood
Severe Storms and
Flooding Ramsey
DR-4182-MN DR 2014-07-21 2014 Flood
Severe Storms, Straight-
Line Winds, Flooding,
Landslides, & Mudslides Ramsey
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 28
Ramsey County Disaster Declarations
DR-4442-MN DR 2019-06-12 2019 Flood
Severe Winter Storm,
Straight-Line Winds, &
Flooding Ramsey
EM-3453-MN EM 2020-03-13 2020 Biological Covid-19 Ramsey
DR-4531-MN DR 2020-04-07 2020 Biological Covid-19 Pandemic Ramsey
Source: FEMA
3.3 Assessment Methodology
The LPT utilized a risk-based formula for assessing hazards in Ramsey County, where Risk = Threat x
Vulnerability x Consequence. Specific sections of the hazard assessment are tied to each of these
variables, giving a well-rounded and thorough examination of each hazard and its relation to Ramsey
County and its communities.
3.3.1 THREAT
Hazards were first assessed for the threat they pose to the county and communities. Elements of threat
were assessed in the following sections in each hazard chapter:
• Hazard Profile
• Location
• Extent
• History
• Probability
• Climate Change Impacts
3.3.2 VULNERABILITY
Ramsey County and its communities were also assessed for vulnerabilities to each disaster. The
following vulnerabilities were assessed in each hazard chapter:
• Vulnerability of People
• Vulnerability of Property
• Vulnerability of the Environment
• Vulnerability of County and Community Operations
3.3.3 CONSEQUENCE
Finally, hazards were assessed for the consequences Ramsey County and its communities could
reasonably expect from an instance of the hazard. While a full scenario wasn’t used for each hazard,
general impacts were reasonable extrapolated for each hazard.
• Impact on the Public
• Impact on Responders
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 29
• Impact on Continuity of Operations
• Impact on Property, Facilities, and Infrastructure
• Impact on the Environment
• Impact on the Economy of the Jurisdiction
• Impact on Public Confidence in the Jurisdiction's Governance
3.4 Hazard Rankings
Each hazard was given a ranking based on three key elements of risk – threat, vulnerability and
consequence.
Table 10. Hazard Rankings
Hazard Threat Vulnerability Consequence Score Hazard Rank
Dam/Levee
Failure
Rare – 1 Localized - 2 Limited – 2 5 Medium
Drought
Occasional –
2
Extensive – 4 Limited – 2 8 Medium
Floods
Frequent – 3 Localized – 2 Critical – 3 8 Medium
Geologic
Hazards
Occasional –
2
Limited – 1 Negligible – 1 4 Low
Hazardous
Materials
Occasional –
2
Limited – 1 Limited - 2 5 Medium
Summer
Weather
Hazards
Likely – 4 Widespread – 3 Limited – 2 9 High
Tornado and
Windstorm
Frequent – 3 Widespread – 3 Catastrophic – 4 10 High
Winter Weather
Hazards
Likely – 4 Widespread – 3 Limited – 2 9 High
Human-Caused
Hazards
Rare – 1 Limited – 1 Catastrophic – 4 6 Medium
Infrastructure
Failure
Rare – 1 Limited – 1 Catastrophic - 4 6 Medium
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 30
3.5 Community Hazard Rankings
Table 11. Hazard Rankings shows hazard rankings by community.
Table 11. Hazard Rankings
Jurisdiction Da
m
/
L
e
v
e
e
Fa
i
l
u
r
e
Dr
o
u
g
h
t
Fl
o
o
d
s
Ge
o
l
o
g
i
c
H
a
z
a
r
d
s
Ha
z
a
r
d
o
u
s
Ma
t
e
r
i
a
l
s
Su
m
m
e
r
We
a
t
h
e
r
H
a
z
a
r
d
s
To
r
n
a
d
o
a
n
d
Wi
n
d
s
t
o
r
m
Wi
n
t
e
r
W
e
a
t
h
e
r
Ha
z
a
r
d
s
Hu
m
a
n
-Ca
u
s
e
d
Ha
z
a
r
d
s
In
f
r
a
s
t
r
u
c
t
u
r
e
Fa
i
l
u
r
e
Arden Hills Medium Medium Medium Low Medium High High High Medium Medium
Falcon Heights Medium Medium Medium Low Medium High High High Medium Medium
Gem Lake Medium Medium Medium Low Medium High High High Medium Medium
Lauderdale Medium Medium Medium Low Medium High High High Medium Medium
Little Canada Medium Medium Medium Low Medium High High High Medium Medium
Maplewood Medium Medium Medium Low Medium High High High Medium Medium
Mounds View Medium Medium Medium Low Medium High High High Medium Medium
New Brighton Medium Medium Medium Low Medium High High High Medium Medium
North Oaks Medium Medium Medium Low Medium High High High Medium Medium
North Saint Paul Medium Medium Medium Low Medium High High High Medium Medium
Roseville Medium Medium Medium Low Medium High High High Medium Medium
Saint Anthony Medium Medium Medium Low Medium High High High Medium Medium
Saint Paul Medium Medium Medium Low Medium High High High Medium Medium
Shoreview Medium Medium Medium Low Medium High High High Medium Medium
Vadnais Heights Medium Medium Medium Low Medium High High High Medium Medium
White Bear Lake Medium Medium Medium Low Medium High High High Medium Medium
White Bear Township Medium Medium Medium Low Medium High High High Medium Medium
Ramsey County Medium Medium Medium Low Medium High High High Medium Medium
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 31
3.6 Dam/Levee Failure
3.6.1 PROFILE
Dams are structures built across a river, stream, or other body of water designed to control and manage
water flow. Dams create reservoirs, which can supply water for domestic, agricultural, and industrial
use, manage water resources, and provide recreational opportunities. Levees are an embankment or
natural ridge constructed along the edges of a river or other body of water to prevent flooding of the
adjacent land. Levees serve to protect populated areas, agricultural lands, and infrastructure from
floodwaters. Failures of dams and levees can result in sudden and severe flooding. The causes of such
failures include natural hazards (earthquakes, flooding severe weather conditions), human-made threats
(terrorism, human error) or other key factors such as structural deficiencies or improper maintenance,
leading to compromise the integrity of the dam/levee. When a dam/levee fails, the rapid release of
water can inundate downstream areas, leading to loss of life, extensive property damage, and
environmental destruction. Populated areas, agricultural lands, and infrastructure located downstream
are particularly vulnerable to impacts. The cascading effects can also include disruption of utilities,
transportation networks, and other critical infrastructure. There are seven dams and no levees located
in Ramsey County.
3.6.2 LOCATION
Table 10 shows dams that are located within the Ramsey County geographical boundaries. There are
also three additional dams outside the county’s borders that have been identified as potential risks to
the county: Coon Rapids Dam in Anoka County and St. Anthony Falls Upper and Lower Lock and Dams in
Hennepin County.
Table 12. Dams Located in Ramsey County
Name Owner River Primary
Purpose
Year
Built
NID
Height
Dam
Type
Classification
Arlington
Detention
City of Saint
Paul
Phalen
Creek
tributary
Flood Risk
Reduction 1989 15' Earth Significant
Battle Creek
WD of
Ramsey-
Washington
Metro
Battle Creek Flood Risk
Reduction 1982 30' Earth High
Battle Creek
Middle
WD of
Ramsey-
Washington
Metro
Battle Creek Flood Risk
Reduction 1983 16' unk High
Battle Creek
Upper
WD of
Ramsey-
Washington
Metro
Battle Creek Flood Risk
Reduction 1983 18' unk High
Hansen Park City of New
Brighton
Rice Creek
tributary Recreation 7’ Low
Keller Lake RWMWD Keller Creek Recreation 1938 12' Gravity Low
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 32
Name Owner River Primary
Purpose
Year
Built
NID
Height
Dam
Type
Classification
Round Lake USFWS Rice Creek
tributary Water Supply 1960 10' Other,
Earth Low
Source: National Inventory of Dams, Minnesota DNR
3.6.3 EXTENT
In the U.S., a common practice among federal and state dam safety officials is to classify dams according
to the potential impact a dam failure or breach would have on upstream or downstream areas or
locations remote from the dam. Three classification levels are used: Low, Significant, and High. Table 13
explains these classifications.
Table 13. Dam Hazard Potential Classification System
Dam Hazard Potential Classification System
Classification Summary Potential
Loss of Life
Economic,
Environmental,
and Lifeline
Losses
Low Hazard Dams assigned the Low Hazard potential
classification are those where failure or
misoperation results in no probable loss of
human life and low economic and/or
environmental losses. Losses are principally
limited to the owner’s property.
None
expected
Low; generally
limited to owner
Significant
Hazard
Dams assigned the Significant Hazard potential
classification are those dams where failure or
misoperation results in no probable loss of
human life but can cause economic loss,
environmental damage, disruption of lifeline
facilities, or can impact other concerns.
Significant Hazard potential classification dams
are often located in predominantly rural or
agricultural areas but could be located in areas
with population and significant infrastructure.
None
Expected
Yes
High Hazard Dams assigned the High Hazard potential
classification are those where failure or
misoperation will probably cause loss of human
life.
Probable;
one or more
expected
Yes (but not
necessary for this
classification)
Source: National Inventory of Dams
Any owner of a dam with a hazard potential classification of High is required to develop an emergency
action plan (EAP). An EAP is a formal document that identifies potential emergency conditions at a dam
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 33
and specifies preplanned actions to be followed to minimize potential property damage and loss of life.
Every EAP must be tailored to site-specific conditions but generally contains six basic elements:
• Notification flowchart
• Emergency detection, evaluation, and classification
• Roles and responsibilities
• Preparedness activities
• Inundation maps
• Appendices
Dam failure is the collapse or failure of an impoundment that causes significant downstream flooding.
The principal consequences of dam failure are injury, loss of life, and significant downstream property
damage. The energy of water stored behind even a small dam is capable of causing loss of life and
significant property damage to people living downstream. The collapse or structural failure of a dam
may be caused by severe storm, earthquake, improper maintenance, erosion, or acts of terrorism. A
failure in a dam upstream can cause additional strain and failure risk to dams further downstream. The
Battle Creek dams are the only dams located within Ramsey County that are classified as High and have
developed EAPs for review. The Coon Rapids Dam and the St. Anthony Falls Upper and Lower Locks and
Dams are classified as significant and have also written EAPs.
3.6.4 HISTORY
There have been no dam failures in Ramsey County in the past, though there have been several dam
failures within the State of Minnesota. Most reported failures have been in low hazard dams, with at
least one exception; the Thomson Dam in northeastern Minnesota overtopped in 2012 due to heavy
rains, causing significant damage to its hydroelectric station and contributing to flooding downstream.
There have been no known deaths, injuries, or property damage from dam or levee failures in the
county. The effects on life and property in the area could be significant if a dam were to fail because of
the nature of the built environment underneath it.
3.6.5 PROBABILITY
The probability of a specific dam failing in any given year is extremely low. Some common causes of dam
failures include overtopping, foundation defects, cracking, inadequate maintenance, or piping and
seepage. According to the Association of State Dam Safety Officials, the primary cause of reported dam
failures between 2010 – 2019 was overtopping, most often due to flooding events.
3.6.6 CLIMATE CHANGE IMPACTS
Climate change can significantly affect the risk and severity of dam and levee failures. The changes most
likely to impact Ramsey County are:
• Changes in seasonal patterns and increased precipitation intensity – more frequent and intense
rainfall events or earlier spring snowmelt can result in higher risk of flooding, putting additional
stress on dams and levees. According to the Minnesota Department of Natural Resources
Climate Change Information website, heavy rains are now more common in Minnesota and
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 34
more intense than at any time on record. Climate projections indicate these big rains will
continue increasing into the future.
• Increased extreme weather events – more frequent and severe storms can cause a higher risk
for dam or levee overtopping.
• Temperature changes, including increased freeze-thaw cycles – this could impact the integrity of
dam and levee foundations.
• Increased demand on water resources – increased demand has the potential for more frequent
drawdowns of reservoirs and added stress on dam operations and structures.
3.6.7 VULNERABILITY ASSESSMENT
3.6.7.1 People
All individuals who live, work, and recreate in areas downstream of the dams are at risk if they are
unable to escape the inundation zone following a failure. Inadequate warning from public warning
systems, such as those provided through Everbridge, local radio stations, and other means can increase
the number of people at risk.
Rising water from a dam failure can cause the same type of impacts as riverine and/or flash flooding,
including injuries and fatalities from drowning, blunt force trauma, or exposure. If inundation is
expected, populations will likely need to be evacuated and may lose access temporarily or long-term to
housing, workplace, and other facilities. Not only can this have immediate physical impacts on people, it
can also have longer-term mental health impacts as people work through the process of having their
lives drastically altered.
3.6.7.2 Property
Inundation from dam failure can cause minor damage up to total loss of structures, utilities, and
roadways. In addition, inundation is likely to impact phone lines, potable water, cable, and electricity;
wastewater and recovery time for these lifelines may be extended. The one high hazard dam located in
Ramsey County, Battle Creek Dam, is situated within Battle Creek Regional Park. Battle Creek runs
through the central eastern metropolitan area of the county. It primarily flows through wooded parks
before emptying into Pigs Eye Lake and eventually discharging to the Mississippi River. Neighborhoods
and public spaces adjacent to the creek, particularly near Pigs Eye Lake could be inundated by a sudden
release of water if the Battle Creek Dam were to fail.
3.6.7.3 Environment
The natural environment is also at risk for impacts caused by dam failure. River habitats, and nearby
wetlands, meadows, and wooded areas may suffer from sedimentation and pollution caused by
hazardous materials (e.g., pesticides, fuel, sewage). Floodwaters may cause significant erosion and can
harm wildlife through drowning, disease, and disruption of habitat. A sudden release of water could
erode stream banks, damage wetlands, and disrupt the ecosystems and wildlife habitats of Battle Creek
Park. A failure of Battle Creek Dam could also send sediment, debris, and pollutants into Pigs Eye Lake
and, eventually, into the Mississippi River, impacting water quality and aquatic life.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 35
3.6.7.4 County and Community Operations
Of the dams located in Ramsey County, the Battle Creek dams (Battle Creek, Battle Creek Middle, and
Battle Creek Upper) are classified as High. These are located within the Battle Creek Regional Park which
should limit the impact to county and community operations if there is a failure.
3.6.8 CONSEQUENCE ASSESSMENT
Impact on the Public
• Loss of life and injury due to sudden flooding.
• Displacement of residents from inundated areas, leading to temporary or long-term evacuation.
• Contamination of water systems, leading to public health impacts.
• Disruption of daily life and access to essential services (e.g., healthcare, education).
Impact on Responders
• Increased risk and operational challenges to emergency responders due to rapid onset of
flooding and compromised access to affected areas, complicating rescue and relief efforts.
• Strain on emergency services, including search and rescue operations and medical response.
• Potential exposure to hazardous materials released during the flood.
Continuity of Operations
• Disruption of governmental and critical services (e.g., water treatment, power supply).
• Long-term impacts on the ability to resume normal operations.
Impact on Property, Facilities, and Infrastructure
• Destruction or severe damage to homes, businesses, and public buildings.
• Short- and long-term structural damage to affected infrastructure, requiring extensive repair or
rebuilding.
• Potential for cascading failures in other infrastructure (e.g., electrical grid, transportation
systems).
Impact on the Environment
• Extensive erosion and sedimentation, altering waterways and landscapes.
• Long-term damage to ecosystems, including loss of habitat and biodiversity.
• Contamination of soil and water, affecting agriculture and drinking water sources.
Impact on the Economy of the Jurisdiction
• Immediate and long-term economic losses due to damage to businesses and property.
• Costs associated with emergency response, recovery, and reconstruction.
• Loss of income and employment in affected areas.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 36
• Decreased property values and potential long-term economic decline in the region.
Impact on Public Confidence in the Jurisdiction's Governance
• Erosion of public trust in local and regional authorities if the dam failure is perceived as
preventable or if the response is inadequate.
• Increased scrutiny and criticism of regulatory and oversight bodies responsible for dam safety.
3.7 Drought
3.7.1 PROFILE
Drought is a prolonged period of significant below-average precipitation in a given location. It is a
normal phase in the climate cycle of most regions, originating from a deficiency of precipitation over an
extended period of time, usually a season or more. Drought can lead to water shortages.
Droughts are climate patterns that occur over long periods of time as the result of many causes. These
patterns are often exacerbated by climatic patterns such as La Nina, human activities such as over-
extraction of groundwater, and inefficient water use practices. Anomalies of precipitation and
temperature may last from several months to several decades. How long they last depend on
interactions between the atmosphere and the oceans, soil moisture and land surface processes,
topography, internal dynamics, and the accumulated influence of global weather systems.
3.7.2 LOCATION
Drought is a regional hazard, impacting large areas of land at once. The entire planning area is
susceptible to drought conditions. Figure 3 shows an example of drought conditions from November
2024. Drought condition maps are updated weekly.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 37
Figure 3. Drought Conditions
Source: United States Drought Monitor
3.7.3 EXTENT
The entirety of the county is susceptible to any of the classifications of drought, up to and including D4
drought as outlined in Figure 4. Drought Classification Categories
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 38
Figure 4. Drought Classification Categories
Source: United States Drought Monitor
3.7.4 HISTORY
Minnesota typically experiences some degree of drought each year. Throughout the years, these
droughts have varied in severity and duration. Major droughts were recorded in the 1930s, peaking
between 1934 and 1936, in 1950s, peaking in 1956, and one of the driest winters on record, the winter
of 1976-1977. More recently, notable droughts were recorded in 1988, 2006-2009, and 2012-2013. One
of the most severe droughts in recent years, the 2021 drought affected much of Minnesota. Extremely
low precipitation and high temperatures led to water shortages, record-low lake levels, and significant
impacts on agriculture and ecosystems. Relevant to this, wildfires were also a major concern, with
several large fires occurring in the state.
Figure 5 illustrates the proportion of land area within the county that has been affected by different
levels of drought severity since 2000, and the slight trend toward more frequent and severe drought
activity in recent years. Monitoring drought trends provides critical data to assess risk, enhance
preparedness, and make informed policy decisions.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 39
Figure 5. Historical Droughts in Ramsey County
Source: United States Drought Monitor
Members of the LPT noted that most jurisdictions in Ramsey County have instituted water restrictions,
mostly focusing on lawn watering on even/odd days. The LPT also noted that only the Governor of
Minnesota can completely restrict water usage.
3.7.5 PROBABILITY
The probability of a drought in Ramsey County depends on various climatic factors, which vary from year
to year. The United States Drought Monitor tracks drought impacts weekly at a variety of jurisdiction
levels, including at the county level. Drought conditions were reviewed for a total of 1,257 weeks
between the first week of January 2000 and the week of August 20, 2024. Ramsey County experienced
some level of drought condition in 44% of the recorded weeks, with the vast majority of those drought
conditions spent in the lower echelon of drought severity.
FEMA’s National Risk Index tool notes that Ramsey County is at a very low risk of drought, although this
is based on agricultural impacts only.
3.7.6 CLIMATE CHANGE IMPACTS
Climate change is expected to alter precipitation patterns, temperatures, and extreme weather events,
which could all contribute to the frequency, severity, and duration of droughts.
Changes in precipitation patterns. It is anticipated that there will be increased variability in precipitation
including irregular rainfall and seasonal shifts which could impact the availability of water throughout
the year. For Ramsey County, warmer winter temperatures could lead to a shift from snow to more
rainfall, resulting in reduced snowpack and less water stored for spring thaw. This could impact the
availability of water for critical growing seasons. Since 1866, the MN Department of Natural Resources
(DNR) has identified 19 historical “mega-rain” events, in which six inches of rain fall over more than
1,000 square miles. More than half of these events occurred in the past 10 years. These mega-rain
events have become four times more frequent since the year 2000 as compared to the previous 30
years. According to the University of Minnesota Climate Change Partnership, future Minnesotans will
likely see longer dry periods and more flash droughts with heavier rain events in between.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 40
Temperature increases. Higher temperatures will likely lead to increased evaporation rates and soil
moisture depletion, both have the potential to significantly impact plants, crops, and vegetation. More
frequent and prolonged heatwaves, which can stress water resources and increase the likelihood of
drought conditions, are also a potential impact. According to DNR, the average temperatures in
Minnesota have increased by almost 3 degrees (F) since 1895, and the 10 warmest years on record for
Minnesota have occurred in the past 20 years. Increases in temperature are expected to continue.
Extreme weather events. Droughts are expected to increase in severity and lead to persistent dry
conditions. Additionally, it is also predicted that intense rainfall events will increase, leading to flash
floods. This will not ease drought conditions and could, in fact, lead to intensified flood-drought cycles.
3.7.7 VULNERABILITY ASSESSMENT
3.7.7.1 People
According to the National Drought Mitigation Center, droughts have both direct and indirect impacts on
people. All individuals who live, work, and recreate within the county are at risk from the impacts of
drought. Drought can lead to impacts on the water supply, and agriculture impacts. Health effects such
as an increased risk of respiratory issues due to dry, dusty conditions can also impact residents of
Ramsey County.
3.7.7.2 Property
Structures, utilities, and transportation are minimally impacted by drought. Drought’s impacts on soils
can impact home and building foundations; according to the Drought Impact Reporter (DIR), the
Mankato Free Press reported on some Twin Cities homes having developed cracks in foundations and
interior walls due to drought conditions in 2022. All property in the county is vulnerable to the impacts
of drought.
Drought can also create water supply challenges by reducing groundwater availability for domestic and
government uses. The DIR notes multiple instances since the year 2000 of water usage restrictions.
3.7.7.3 Environment
Drought is significantly impactful to the environment and natural resources. Long-term drought can
impact lake and river levels. It impacts agriculture through crop loss, insect infestations, plant diseases,
and wind erosion. Algae blooms occur in the river, and streams may be cut off. Environmental losses
also include plants and wildlife, because air and water quality can plummet with associated dust,
wildland fires, and habitat loss. Extreme heat alongside drought may amplify these impacts.
3.7.7.4 County and Community Operations
The impact of a drought on a community can be profound, impacting water supply, agriculture,
economy, public health, and the environment. Drought can strain on water systems and infrastructure –
increased demand and decreased supply can stress the water infrastructure, possibly leading to failure
and the need to invest in costly maintenance and/or new infrastructure to ensure a reliable water
supply. Drought can impact operations that requires water to function; a key example is the fire service.
Drought can also reduce the availability of potable water, leading to water rationing and restrictions, for
residential areas and agriculture.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 41
3.7.8 CONSEQUENCE ASSESSMENT
Impact on the Public
• Water scarcity, leading to restricted access to potable water for drinking, hygiene, and
sanitation.
• Increased health risks, including dehydration, malnutrition, and respiratory issues from poor air
quality due to dust.
• Rising food prices and potential food shortages due to reduced agricultural output.
• Mental health impacts from prolonged stress, uncertainty, and potential displacement.
Impact on Responders
• Strain on emergency services to manage water distribution, firefighting, and health services.
Increased demand for medical services due to heat-related illnesses and poor air quality.
• Challenges in managing public order, particularly if water shortages lead to unrest or conflicts
over resources.
Continuity of Operations
• Disruption of water-dependent operations, including agriculture, industry, and public utilities.
• Need for water rationing or prioritizing critical services, such as healthcare and firefighting.
• Challenges in maintaining normal government operations due to resource scarcity and increased
demands on infrastructure.
Impact on Property, Facilities, and Infrastructure
• Damage to infrastructure such as water treatment plants, reservoirs, and pipelines due to
overuse or drying up.
• Increased wear and tear on buildings and roads due to heat stress and lack of moisture.
• Potential for increased fire hazards, leading to property loss and infrastructure damage.
Impact on the Environment
• Degradation of ecosystems, including loss of wetlands, forests, and wildlife habitats.
• Reduced water levels in rivers, lakes, and reservoirs, impacting aquatic life and biodiversity.
• Increased soil erosion and desertification, leading to long-term land degradation.
Impact on the Economy of the Jurisdiction
• Decreased river levels impacting movement of goods in/out of the county.
• Significant economic losses in agriculture, particularly in crop and livestock production.
• Reduced industrial productivity due to water shortages, impacting sectors like manufacturing,
energy, and mining.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 42
• Long-term economic downturn from loss of revenue, increased unemployment, and higher costs
for water and food imports.
Impact on Public Confidence in the Jurisdiction's Governance
• Criticism of water management policies, including allocation, conservation, and infrastructure
investment. Potential for social unrest or political challenges if the public perceives inequities or
failures in drought response efforts.
3.8 Floods
3.8.1 PROFILE
Floods occur when water inundates land that is typically dry. This can occur during periods of intense
rainfall, high tides coupled with storm surges, rapid snowmelt, or the failure of dams or levees.
Damaging floods may happen with only a few inches of water, or it may cover a house to the rooftop.
Flood events can develop in a matter of minutes or evolve over an extended timeframe, persisting for
days, weeks, or more. Among all natural disasters related to weather, floods are the most frequent and
have the broadest impact, often being the primary type of weather-related calamity affecting
reservations.
Flash or urban flooding occurs when storm sewers and other drainage systems are overwhelmed by the
amount of rain falling in a short period of time. The National Weather Service (NWS) gives the advice
“Turn Around, Don’t Drown” for flash floods. What makes flash floods dangerous is their sudden nature
and fast-moving water.
Flooding is a hazard that can strike in any U.S. state or territory, as well as any global location prone to
rainfall. In the United States, floods claim more lives annually than tornadoes, hurricanes, or lightning
strikes. High-risk areas for flash floods include densely populated regions, vicinities adjacent to rivers,
and locales near dams. Intense downpours have the potential to induce floods even on parched ground;
areas recently affected by wildfires in mountainous regions are particularly vulnerable, and ice jams
along with snowmelt are additional factors that can contribute to flash floods.
3.8.2 LOCATION
Those communities along the banks of the Mississippi, including the City of Saint Paul, are particularly
vulnerable to riverine flooding.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 43
Figure 6. 100-Year Floodplain in Ramsey County
Source: 2019 MHMP Ramsey County
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 44
The National Flood Insurance Program (NFIP) is a federal program that provides flood insurance to
property owners, renters and business located in communities with mapped floodplains that opt to
participate in the program. To participate in the NFIP, a community must:
• Adopt a floodplain ordinance that meets or exceeds minimum NFIP criteria, including
regulations on land use, development controls, and building codes within the floodplain, as
defined by the community’s Flood Insurance Rate Map (FIRM).
• Pass a resolution of intent to participate in the program.
• Comply with FEMA minimum standards for floodplain management.
• Enforce enacted regulations.
The following Ramsey County communities participate in the NFIP:
• City of Arden Hills
• City of Blaine (Ramsey/Anoka County)
• City of Falcon Heights
• City of Gem Lake
• City of Lauderdale
• City of Little Canada
• City of Maplewood
• City of Mounds View
• City of New Brighton
• City of North Saint Paul
• City of Roseville
• City of Shoreview
• City of Spring Lake Park (Ramsey/Anoka
Counties)
• City of St. Anthony (Ramsey/Hennepin
Counties)
• City of Saint Paul
• City of Vadnais Heights
• City of White Bear Lake
(Ramsey/Washington Counties)
• Township of White Bear
The City of North Oaks has a current effective map date of June 4, 2010, but is not a member of the
NFIP.
3.8.3 EXTENT
In hazard analysis, the 100-year and 500-year floodplains maps are utilized for understanding flood risk
and informing land-use planning, emergency response, and infrastructure development. These
designations represent areas that have a 1% (100-year) and 0.2% (500-year) chance of flooding in any
given year. These maps help identify areas most at risk of flooding, which is vital for minimizing damage
and ensuring public safety.
100-Year Floodplain: This area is commonly used as the baseline for regulatory and insurance purposes.
It is the standard by which flood insurance requirements are determined, and it guides zoning
regulations, construction codes, and infrastructure projects. Because these areas are more likely to
experience flooding, they are most often prioritized for flood prevention and mitigation measures.
500-Year Floodplain: Although the likelihood of flooding in these areas is lower, the 500-year floodplain
helps to identify areas that could be affected by more extreme events, including critical infrastructure,
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 2
such as hospitals, emergency facilities, and power plants, where the consequences of flooding would be
severe.
3.8.4 HISTORY
The National Climatic Data Center Storm Events Database was consulted for records of historical floods
and flash flooding. The earliest records occurred in 1997. Since 1997, Ramsey County has experienced
six major flood events, causing $4.3 million in property damage and no injuries or fatalities. The county
has also experienced fifteen major flash flood events causing over $700k in property damage, one
fatality and one injury. Figure 7 shows flood and flash flood history in Ramsey County.
Figure 7. Ramsey County Historical Floods, 1997 - August 2024
Location or County Date Type Deaths Injuries Property
Damage
Federally
Declared
Disaster
Saint Paul 7/5/2020 Flash
Flood 0 0 Unknown
Ramsey County March – April
2019 Flood 0 0 unknown Yes
Saint Paul 9/17/2015 Flash
Flood 0 0 unknown
Saint Paul 6/18/2014 Flood 0 0 $1,900,000 Yes
Falcon Heights 6/21/2013 Flash
Flood 0 0 unknown
Saint Paul 6/21/2013 Flash
Flood 0 0 unknown
New Brighton 8/16/2011 Flash
Flood 0 0 unknown
White Bear Lake 7/16/2011 Flash
Flood 0 0 $500,000
Ramsey County 3/16/2011 Flash
Flood Unk Unk Unknown Yes
Little Canada 8/10/2010 Flash
Flood 0 0 unknown
Saint Paul 6/26/2010 Flash
Flood 0 0 unknown
Saint Paul 3/20/2010 Flood 0 0 $2,400,000 Yes
Saint Paul 9/20/2007 Flash
Flood 1 0 $200,000
Countywide 10/4/2005 Flash
Flood 0 0 unknown
Ramsey County 10/4/2005 Flood 0 0 unknown
North Portion 9/21/2005 Flash
Flood 0 0 unknown
Ramsey Co. 6/20/2005 Flash
Flood 0 0 $2,000
Saint Paul 6/25/2003 Flash
Flood 0 0 unknown
Vadnais Heights 7/28/2002 Flash
Flood 0 0 unknown
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 3
Location or County Date Type Deaths Injuries Property
Damage
Federally
Declared
Disaster
Ramsey County 5/1/2001 Flood 0 0 unknown Yes
Ramsey County 4/1/2001 Flood 0 0 unknown
Roseville 9/2/2000 Flash
Flood 0 0 unknown
Saint Paul 7/1/1997 Flash
Flood 0 1 unknown
Ramsey County 4/4/1997 Flood 0 0 unknown
Source: NOAA National Centers for Environmental Information
Flooding in 2010 was caused by accumulating snowfall across the Upper Midwest and Northern Plains,
with snowfall water equivalent amounts as high as six inches. Freezing temperatures broke in March of
that year, accelerating melting and unleashing 3-6 inches of liquid water on the surface. Ice jams
exacerbated flooding problems. The flooding caused $2.4 million in property damages, and no deaths or
injuries.
Flooding in 2014 directly impacted Saint Paul. Parts of Minnesota received 10-12 inches of rain over a
week in June, which was anywhere from 400-600% above normal amounts. The Twin Cities had their
wettest start of the year since 1871. Saint Paul Airport deployed a flood wall which closed two of their
shorter runways. Due to floodwaters affecting downtown Saint Paul and covering Harriet Island, the
Taste of Minnesota and 4th of July fireworks show were moved to different locations. High water on the
Mississippi also forced the Minnesota Centennial Showboat to postpone a week of shows. This flooding
caused $1.9 million in property damages, and no deaths or injuries.
A flood’s crest is the level at which a river peaks before it starts to recede. Figure 8 shows historical flood
crests for flooding in the Mississippi River at Saint Paul and South Saint Paul, as well as historical flood
crests for Rice Creek in Mounds View.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 4
Figure 8. Historical Flood Crests
Historical Flood Crests for
Mississippi River at Saint Paul,
MN
Date Height
(Feet)
4/16/1965 26.01
4/15/1969 24.52
4/18/2001 23.76
4/30/2001 23.20
4/13/1997 22.37
4/16/1952 22.02
3/31/2013 20.19
6/29/2024 20.17
(P)
6/26/2014 20.13
Historical Flood Crests for
Mississippi River at South Saint
Paul, MN
Date Height
(Feet)
4/29/2001 703.04
4/18/2001 703.03
4/13/1997 702.90
6/26/2014 700.94
6/25/1993 699.98
3/30/2011 698.95
3/24/2010 698.56
7/02/2013 694.84
6/03/2012 694.02
4/01/2009 693.87
Historical Flood Crests for Rice
Creek in Mounds View, MN
Date Height
(Feet)
6/19/2014 12.25
8/16/2011 11.17
5/24/2012 10.49
5/19/2013 10.43
3/22/2010 9.55
7/6/2015 9.45
Source: NOAA Water Prediction Service
3.8.5 PROBABILITY
Minor flooding is an annual occurrence in Ramsey County. According to the Storm Events Database, six
major flood events occurred over the 32-year period presented, with a probability of a major flood
event every 5 years. Fifteen flash/urban flooding events occurred in the same period, presenting a
probability of almost one major flash flood every two years. As storms become more severe and rainfall
becomes heavier, these probabilities may increase.
3.8.6 CLIMATE CHANGE IMPACTS
Climate change could significantly impact riverine flooding through changes in seasonal and increased
precipitation and intensity, changes in snowmelt and runoff patterns, increased stress on flood
management infrastructure, such as dams, levees, and stormwater systems, and altered river and
watershed dynamics. These changes may result in rising river levels, increased risk of flood-related
damage, and more intense and frequent flooding events.
Similarly to potential changes to riverine flooding, climate change could also impact flash flooding
through increased frequency and intensity of heavy rainfall, altered seasonal precipitation patterns, and
stress on stormwater infrastructure. In addition, increased urbanization and expanded impervious
surfaces, changes in land use and vegetation, and changing soil and drought cycles may lead to more
frequent and severe flash floods, with higher runoff and rapid onset, particularly in urban areas of the
county.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 5
3.8.7 VULNERABILITY ASSESSMENT
3.8.7.1 People
Flash floods and river flooding can lead to injury or loss of life. In urban areas, rapidly rising water levels
can trap residents in their homes, vehicles, or other spaces, often in immediate danger and requiring
rescue. The poorest residents suffer disproportionately to flood situations, especially those who have
been less able to fund homeowner’s insurance to protect against flood losses. Mental health issues are
experienced by people who have experience flood losses, including anxiety, fear, anger, anger, sadness
and grief.
3.8.7.2 Property
Homes and businesses in low-lying areas and in flood-prone areas are at significant risk of flooding and
damage. It is common for these structures to suffer structural damage, water in lower levels, and loss of
personal property. Facilities in these areas can also see declines in property values and increased
insurance costs.
Hazus runs from the 2019 plan estimate the number of households that are expected to be displaced
from their homes due to the flood and the associated potential evacuation. Hazus also estimates those
displaced people that may require accommodations in temporary public shelters. The model estimates
2,015 households may be displaced due to the flood. Displacement includes households evacuated from
within or very near to the inundated area. Of these, the model estimates 342 people (out of a total
population of 508,640) may seek temporary shelter in public shelters.
Repetitive loss properties are defined as properties that have had 2 or more flood insurance claims of
$1,000 or more in any rolling 10-year period. Property owners are asked to consider mitigation activities
such as acquisition, relocation, or elevation, among other options. FEMA’s Repetitive Loss (RL)
properties strategy is to eliminate or reduce the damage to property and the disruption to life caused by
repeated flooding of the same properties. Property owners are notified of their status by FEMA.
There are two repetitive loss properties in Ramsey County, both located in the City of Saint Paul. Four
losses have been recorded between the two properties, with an average payment of $10,610. None are
classified as “Severe Repetitive Loss” (SRL). An SRL property is defined as a residential property that is
covered under an NFIP flood insurance policy and:
• That has at least 4 NFIP claim payments (including building and contents) over $5,000 each, and
the cumulative amount of such claims payments exceeds $20,000; or
• For which at least 2 separate claims payments (building payments only) have been made with
the cumulative amount of the building portion of such claims exceeding the market value of the
building.
• For both (a) and (b) above, at least 2 of the referenced claims must have occurred within any 10-
year period and must be greater than 10 days apart.
3.8.7.3 Environment
Detrimental environmental effects of flooding can include soil and bank erosion, bed erosion, siltation or
landslides. It can damage vegetation and pollutants carried by flood water can impact on water quality,
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 6
habitats and flora and fauna. Flooding also brings with it the potential for contamination that leads to
waterborne diseases, as well as hazardous material, raw sewage, and debris contamination. Flood
waters often pollute drinking water supplies. When flood waters recede, toxic mold may remain, which
can increase incidences of asthma and other respiratory distress. Flooding can however play a beneficial
role in natural habitats.
3.8.7.4 County and Community Operations
Essential facilities encounter the same impacts as other buildings within the flood boundary: structural
failure, extensive water damage to the facility, and loss of facility functionality (i.e. a damaged police
station will no longer be able to serve the community). However, none of Ramsey County’s essential
facilities (care facilities, fire stations, police stations and schools) included in the 2019 Hazus analysis are
located within the flood boundary.
3.8.8 CONSEQUENCE ASSESSMENT
Impact on the Public
• Risk of drowning, injury, or death due to sudden and fast-moving floodwaters.
• Displacement of residents, leading to temporary or permanent relocation and the loss of
personal property.
• Health risks from contaminated water, including waterborne diseases and hazardous materials.
• Disruption of daily life, including access to transportation, healthcare, and basic services.
Impact on Responders
• Increased danger to emergency responders operating in hazardous conditions, including swift
water, debris, and unstable structures.
• Overextension of resources and personnel due to the immediate and widespread nature of the
response required.
• Challenges in coordinating rescue and relief efforts, particularly in rapidly changing flood
conditions and possible damage to roads, bridges, and other critical infrastructure.
Continuity of Operations
• Disruption of essential services, including power outages, water supply interruption, and
communication failures.
• Challenges in maintaining public safety and order, particularly if critical infrastructure is
compromised.
• Delays in recovery efforts due to damage to roads, bridges, and other transportation networks.
Impact on Property, Facilities, and Infrastructure
• Extensive damage or destruction of homes, businesses, and public buildings due to inundation
and debris impact.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 7
• Severe damage to critical infrastructure such as roads, bridges, sewage systems, healthcare, and
electrical grids.
• High costs for repairs, reconstruction, and mitigation efforts, potentially overwhelming local
resources.
Impact on the Environment
• Erosion of soil, riverbanks, and landscapes, leading to long-term ecological changes.
• Pollution of rivers, lakes, and groundwater with debris, chemicals, and sewage from
floodwaters.
• Destruction of natural habitats, negatively affecting wildlife and biodiversity.
Impact on the Economy of the Jurisdiction
• Immediate economic losses from damage to commercial properties, agricultural lands, and
infrastructure.
• Long-term economic challenges due to the cost of rebuilding and the potential for reduced
investment and tourism.
• Potential loss of jobs and income.
Impact on Public Confidence in the Jurisdiction's Governance
• Erosion of public trust if the flooding is perceived as preventable or if the response is
inadequate.
• Increased scrutiny of floodplain management, land-use planning, and emergency preparedness
policies.
3.9 Geologic Hazards
3.9.1 PROFILE
A geologic hazard is an adverse geological condition causing damage or loss of property or life. These
hazards only become hazards when they impact life or property and are very much a normal part of
environmental processes. Ramsey County is at risk of a variety of geologic hazards, the most common of
which are:
• Landslide: The downward movement of a mass of rock, soil, and debris along a slope or cliff
face. This movement can range from gradual, slow displacement to rapid, catastrophic events.
Landslides are typically triggered by factors such as heavy rainfall, earthquakes, volcanic activity,
or human activities that destabilize slopes. Examples of landslides include rock falls and debris
flows. According to the United States Geological Survey (USGS), the most common type of
landslides in Minnesota are shallow slope failures that occur during heavy rain.
• Land subsidence: The gradual sinking or settling of the earth's surface, often due to the
compaction of underground layers of soil, sediment, or rock. This phenomenon can occur
naturally or be exacerbated by human activities such as groundwater extraction, oil and gas
extraction, mining, or the drainage of organic soils. Examples of land subsidence include
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 8
sinkholes and soil compaction. According to the USGS, more than 80% of the identified
subsidence in the United States is a consequence of human impact on subsurface water and is
an often-overlooked environmental consequence of land and water-use practices. Increasing
development can exacerbate subsidence problems and initiate new ones.
3.9.2 LOCATION
Parts of Ramsey County sit on a thick layer of limestone rock that is riddled with small holes and caves,
known as karst topography. Its large rivers and hills also create many slopes and cliffs. Heavy surface
rains may cause karst landscapes to fail causing landslides or sinkholes. Figure 9 shows karst distribution
throughout Minnesota.
Figure 9. Karst Distribution in MN
Source: www.ramseycounty.us
Figure 10 displays unstable soils and bedrock in south Ramsey County.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 9
Figure 10. Unstable Soils and Bedrock in South Ramsey County
Source: Ramsey 2040 Comprehensive Land Use Plan
3.9.3 EXTENT
3.9.3.1 Landslide
To determine the extent of a landslide hazard, it is essential to identify affected areas and assess the
probability of a landslide occurring within a specified period. Key natural variables that influence
landslide activity include soil properties, topographic position and slope, and historical occurrences.
Predicting landslides remains challenging, even with ideal conditions and reliable data. Consequently,
landslide hazards are often represented by landslide incidence and/or susceptibility, as defined below:
• Landslide incidence refers to the number of landslides occurring in a specific geographic area. A
high incidence indicates that over 15% of the area has experienced landslides. Medium
incidence means that 1.5% to 15% of the area has been affected, while low incidence indicates
that less than 1.5% of the area has experienced landslides.
• Landslide susceptibility refers to the likelihood of geologic formations responding to natural or
artificial alterations, such as slope cutting, loading, or unusually high precipitation. Areas with a
history of numerous landslides are particularly vulnerable to new movements under these
conditions. Susceptibility is influenced by slope angle and the underlying geologic material. It
identifies potential landslide-prone areas but does not specify a time frame for when a landslide
might occur. High, medium, and low susceptibility are categorized using the same percentages
as landslide incidence: over 15% for high, 1.5% to 15% for medium, and less than 1.5% for low.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 10
Common techniques for measuring and monitoring the extent of landslides include field surveys (e.g.,
geological mapping, slope measurements), remote sensing (e.g., satellite imagery, aerial photography),
ground-based monitoring (e.g., GPS, inclinometers, extensometers), and Light Detection and Ranging
(LiDAR).
3.9.3.2 Land Subsidence
Subsidence can develop gradually or suddenly due to natural processes, such as karst sinkholes in areas
with soluble bedrock, or due to human activities. In the U.S., subsidence has affected over 17,000
square miles across 45 states, with annual costs estimated at $125 million. The primary causes include
aquifer-system compaction, organic soil drainage, underground mining, hydro compaction, natural
compaction, sinkholes, and thawing permafrost.
Common techniques for measuring and monitoring the extent of land subsidence include geodetic
surveys (e.g., leveling surveys, GPS/GNSS monitoring), remote sensing (e.g., Interferometric Synthetic
Aperture Radar [InSAR], satellite imagery), borehole measurements (e.g., extensometers, piezometers),
and LiDAR.
3.9.4 HISTORY
Ramsey County has a moderate history of impactful geologic incidents. The MN Department of Natural
Resources (DNR) paper Historical Landslide Inventory for the Twin Cities Metropolitan Area was
consulted for incident records.
Table 14. Significant Geological Hazard Events in Ramsey County, MN
Est. Date Type Location Deaths/
Injuries
Property
Damage
Description
May 13,
1879
Landslide Saint Paul u/k u/k Rock and sediment
July 28,
1892
Landslide Saint Paul u/k u/k Unknown
Winter
1969
Landslide Saint Paul u/k u/k Sediment
July 24,
1987
Landslide Saint Paul u/k u/k Glacial sediment. This was
a late-night event
associated with a slow-
moving thunderstorm.
April 8,
2011
Landslide Saint Paul u/k u/k Rock. A boulder the size of
two minivans struck and
demolished a local bakery.
May 1,
2011
Landslide Saint Paul u/k u/k Glacial sediment and fill
May 22,
2013
Landslide Saint Paul 2/4 u/k Rock and sediment. A
rockslide killed two and
injured two fourth graders
at Lilydale Regional Park.
Two firefighters were also
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 11
Est. Date Type Location Deaths/
Injuries
Property
Damage
Description
injured in the response.
June 19,
2014
Landslide Saint Paul u/k u/k Sediment. Heavy rainfall
caused a landslide beneath
a hospital at the
University of Minnesota.
April 28,
2018
Landslide Saint Paul 0/0 $766k An estimated 400,000
pounds of rock and soil
came loose on the bluff to
cover Wabasha Street
between Plato Boulevard
and Cesar Chavez Street.
9
Significant
Incidents
-- -- 2/4 $766,000
total
claimed
--
Sources: MN DNR and 2019 Ramsey MHMP
During Planning Meeting #2, members of the LPT noted a landslide in Gem Lake that caused disruption
to nearby railroad tracks, although further research didn’t find any written record of it.
3.9.5 PROBABILITY
Geologic hazard incidents are an occasional occurrence within Ramsey County. Six significant incidents
have occurred since 1970, giving a probability of approximately an 11% chance of a significant geologic
hazard incident occurring within any given year. During Planning Meeting #2, the LPT noted that
mitigation of geologic hazard risks has been implemented across the county; as mitigation continues,
probability of incidents will decrease.
3.9.6 CLIMATE CHANGE IMPACTS
Climate change can significantly influence geologic hazards in Rasmey County through various
mechanisms. Here are some key impacts:
• Increased Frequency of Heavy Rainfall: More intense and frequent heavy rainfall can saturate
soils, increasing the likelihood of landslides, especially in areas with steep slopes or unstable
terrain. It can also lead to more frequent and severe flooding, which can erode riverbanks and
destabilize the ground, potentially triggering landslides and soil erosion. Heavy rains in
Minnesota are now more frequent and intense than ever recorded. Long-term observation sites
have shown significant increases in 1-inch and 3-inch rainfalls, as well as the heaviest annual
rainfall events. Since 2000, the state has also experienced a notable rise in widespread extreme
rainstorms. Rainfalls that historically ranked in the top 2% are becoming more common. Climate
projections suggest that these heavy rains will continue to increase in the future.
• Temperature Extremes: Increased variability in temperatures can lead to more frequent freeze-
thaw cycles, which can cause soil and rock to expand and contract. This process can weaken
slopes and contribute to landslides and rockfalls. Minnesota has warmed by 3.0°F between 1895
and 2020, with the most dramatic changes occurring in recent decades. Since 1970, nearly every
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 12
year has been warmer than the 20th-century average. Each of the top 10 warmest years on
record occurred between 1998 and 2020. These warming trends are expected to continue
through the 21st century.
• Drought: Extended periods of drought can dry out soils, making them more susceptible to
erosion when rains do return. This can lead to a loss of fertile topsoil and increased sediment in
waterways. Groundwater depletion during droughts can cause land subsidence, particularly in
areas where groundwater is heavily relied upon for agriculture and other uses.
• Changes in Vegetation: Vegetation helps to stabilize slopes by binding soil with roots. Changes
in vegetation patterns due to climate change, such as increased prevalence of invasive species
or loss of native plants, can reduce slope stability and increase landslide risk. Northern tree
species in Minnesota, such as paper birch, quaking aspen, balsam fir, and black spruce, may
begin to decline and shift further north. In their place, warmer-climate species like maples, oaks,
and hickories could become more prevalent. These shifts in tree cover will also bring changes to
soil habitats.
By understanding these impacts, communities in the Ramsey County can develop more effective
strategies for mitigating the risks associated with geologic hazards in the context of a changing climate.
3.9.7 VULNERABILITY ASSESSMENT
3.9.7.1 People
People living in areas with steep terrain are at greater risk of landslides, and those living in floodplains
and river valleys may experience greater incidences of flooding and erosion, leading to increased risk of
land subsidence and landslides. Additionally, populations in older cities and towns with aging
infrastructure are more susceptible to damage from geologic hazards. Similarly, those living in
affordable housing may be located in areas more prone to geologic hazards and may be less structurally
resilient.
3.9.7.2 Property
In residential and commercial areas, houses and critical infrastructure built on or near steep slopes are
vulnerable to landslides, especially during periods of heavy rainfall or rapid snowmelt. Subdivisions built
on filled land or areas with unstable soils may be prone to over time. Infrastructure like roads and
highways traversing hilly or unstable terrain are susceptible to landslides and slope failures, as are
structures spanning rivers or valleys which can be impacted by erosion and subsidence, affecting
stability and safety. Geologic hazards can threaten underground infrastructure such as pipelines for
water, wastewater, gas, and electricity, as well as communication cables.
3.9.7.3 Environment
Landslides and subsidence can fragment habitats and disrupt ecosystems, affecting wildlife and plant
communities. Sedimentation from landslides can degrade water quality in rivers, lakes, and streams,
impacting aquatic ecosystems and drinking water sources. Finally, erosion and sedimentation can
reduce soil fertility and agricultural productivity, affecting food security and livelihoods.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 13
3.9.7.4 County and Community Operations
Roads, bridges, and railways are essential for transporting goods and people. Landslides and land
subsidence can block roads or damage bridges, disrupting transportation and emergency response
efforts. Utility and communication system grids can be damaged, leading to service interruptions and
potentially affecting public health and safety.
3.9.8 CONSEQUENCE ASSESSMENT
Impact on the Public
• Risk of injuries or fatalities from sudden landslides or gradual subsidence leading to ground
collapse.
• Evacuation and temporary relocation of residents from affected areas.
• Mental health impacts from displacement and trauma; physical health risks from injuries or
exposure to hazardous conditions.
Impact on Responders
• Difficult terrain and unstable ground conditions hindering emergency response efforts.
• Increased risk to responders working in unstable areas prone to further landslides or
subsidence.
• Need for specialized equipment and training to safely conduct rescue and recovery operations.
Impact on Continuity of Operations
• Disruption to government services and operations located in or near affected areas.
• Potential interruption of critical infrastructure systems, including utilities and transportation
networks, if located in landslide or subsidence zones.
Impact on Property, Facilities, and Infrastructure
• Structural damage or total destruction of buildings located in landslide or subsidence zones.
• Damage to schools, hospitals, and other public facilities, necessitating repairs or reconstruction.
• Road closures, rail line disruptions, and damage to bridges affecting mobility and logistics.
• Damage to water, gas, and electricity lines, leading to service outages and potential hazards.
Impact on the Environment
• Disruption to local ecosystems and wildlife habitats due to ground movement and landscape
alteration.
• Increased erosion, sedimentation of water bodies, and potential contamination from disrupted
underground utilities.
• Loss of vegetation cover contributing to further erosion and destabilization of slopes.
Impact on the Economy of the Jurisdiction
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 14
• Decrease in property values in high-risk areas, impacting homeowners and local tax revenue.
• Disruption to local businesses, leading to financial losses, job displacement, and reduced
economic activity.
• Significant expenses for rebuilding and repairing damaged infrastructure and properties.
• Increased insurance premiums and potential difficulty in obtaining coverage for properties in
high-risk zones.
Impact on Public Confidence in the Jurisdiction's Governance
• Public perception of the government's ability to manage and mitigate geologic hazards
effectively.
• Importance of clear and timely communication with the public regarding risks, mitigation
measures, and response efforts.
• Potential for increased scrutiny of government officials and policies, leading to political
challenges or changes in leadership.
3.10 Hazardous Materials
3.10.1 PROFILE
Materials considered hazardous are commonly and safely used across communities daily. When a
chemical or other substance that may harm health or the environment has been released into the air,
water or ground, it is considered a hazardous materials incident. Incidents can occur when materials are
being produced, stored, transported, used, or disposed of. Most hazardous incidents are quickly, easily
and safely contained; however, potential exists for longer lasting and harmful incidents. This chapter
focuses on the following types of incidents:
• Spills: Accidental release of hazardous substances can lead to contamination of soil, water, and
air.
• Pipelines: Leaks or ruptures in pipelines can release hazardous materials into the environment.
• Trucking: Transportation accidents involving trucks can result in the release of hazardous
cargoes.
• Railways: Train derailments or collisions can lead to significant spills of hazardous materials.
3.10.2 LOCATION
Due to the unexpected nature of a hazardous materials event, the entirety of Ramsey County would be
considered at risk for these types of events. Hazardous materials incidents are classified as either fixed
incidents or mobile incidents. Approximately 80%-90% of incidents occur at fixed sites, such as factories
and storage facilities. Impacts are typically limited to the site itself, and the immediate surrounding area.
Ramsey County is home to a number of chemical plants and facilities, ranging from manufacturing to
processing and distribution of chemicals, including 3M Company Headquarters in Maplewood, Ecolab
Inc. in Saint Paul, and HB Fuller, located in Vadnais Heights. There are also several large waste and
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 15
recycling facilities in the county which handle various types of waste, including hazardous materials. The
notable facilities include the Ramsey County Recycling and Energy Center and the Ramsey County
Household Hazardous Waste Facility. Other adjacent facilities and private waste management
companies also pose hazardous materials risks. Ramsey County is home to several major including on
the University of Minnesota, Saint Paul Campus, 3M Company, MN Department of Public Health
Laboratory, and EcoLab. Hospitals and healthcare facilities can also be sites for hazardous materials
incidents. A number of hospitals and health care facilities located within Ramsey County handle
materials as part of their regular operations.
The remainder of incidents occur while a material is in transit. These incidents can occur on major
roadways, railways, or in pipelines. The following are the most likely locations for mobile accidents to
occur within the county:
• Transportation Routes
o Roadways – Ramsey County is served by a number of major roadways including
Interstates 94 (I-94), 35E (I35E), and 694 (I-694); US Highways 52 and 61; and MN State
Highways 36 (MN-36), 51 (MN-51), and 280 (MN-280). Additionally, there are a number
of major county roads that transverse the region as well.
o Intersections/Interchanges – Major intersections/interchanges in Ramsey County
include I-94 and I-35E, I-94 and MN-280, and I-694 and I-35E. Other significant urban
and suburban intersections are located across the county as well.
o Bridges and Overpasses – Ramsey County has a number of key bridges and overpasses
including a number that span the Mississippi River and interstate and highway
overpasses.
o Railroads – Ramsey County is a significant hub for rail transportation in the region, with
BNSF Railway, Union Pacific Railroad, Canadian Pacific Railway, and Amtrak providing
freight and passenger services with the county.
o Airports – While the major airport that services Ramsey County (Minneapolis – Saint
Paul International Airport (MSP)) is located in adjacent Hennepin County, portions of
Ramsey County will be in the flight path for MSP. In addition, there are two smaller
airports located within the County: Saint Paul Downtown Airport (STP) and Lake Elmo
Airport.
• Pipelines
o Oil and Gas Pipelines – Oil and gas pipelines are present in Ramsey County, including
natural gas and petroleum products, such as gasoline, diesel, and jet fuel.
3.10.3 EXTENT
The extent of a hazardous material event can vary widely depending on several factors including
physical area affected, environmental impact, population affected, duration, severity of health risks,
economic impact, infrastructure affected, response required, and legal and regulatory implications.
Hazardous materials are organized into nine classes:
• Class 1: Explosives
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 16
• Class 2: Gases
• Class 3: Flammable Liquids
• Class 4: Flammable Solids
• Class 5: Oxidizer
• Class 6: Poisonous Materials
• Class 7: Radioactive Materials
• Class 8: Corrosive Materials
• Class 9: Miscellaneous Hazardous Materials
Figure 11. Hazardous Materials Classes
Source: Federal Motor Carrier Safety Administration
3.10.4 HISTORY
Ramsey County has experienced several notable hazardous materials incidents in recent years,
including:
• University Avenue Chemical Spill. Occurring in Saint Paul in November 1992. A tanker truck
carrying hazardous chemicals overturned on University Avenue, causing a significant spill of
industrial solvents. This led to an evacuation of nearby businesses and residents, traffic
disruption, and road closures for several hours. The spill was contained and cleaned but did
pose a risk to public health and the environment.
• H.B. Fuller Plant Fire (2002). Occurring in June 2002 at the H.B. Fuller Company plant in Vadnais
Heights. A fire broke out at the H.B. Fuller adhesive manufacturing plant, causing the release of
hazardous fumes and chemicals. This led to the evacuation of employees and nearby residents
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 17
due to the risk of toxic smoke inhalation, resulting in significant property damage and concerns
about air quality.
• Saint Paul Riverfront Chemical Leak. Occurring in May 2007 in the riverfront industrial area in
Saint Paul. A leak of anhydrous ammonia occurred at an industrial facility near the Mississippi
River. This release led to the evacuation of nearby residents and workers and raised concerns
about industrial safety and environmental protection along the riverfront.
• BNSF Railway Chemical Spill. Occurring in September 2010 at the BNSF Railway yard, Saint Paul.
A derailment of a train carrying hazardous materials occurred at the BNSF Railway yard, causing
a spill of chemicals, including sulfuric acid. This spill required the evacuation of the immediate
area and the deployment of hazmat teams to contain and clean up the hazardous substances.
The incident disrupted rail operations and posed a risk to public health and the environment,
prompting concerns about potential groundwater contamination and air quality.
• Energy Park Drive Industrial Fire. Occurring in July 2015, in the industrial area along Energy Park
Drive, Saint Paul. A fire at an industrial facility led to the release of hazardous smoke and
chemicals, prompting the evacuation of workers and nearby residents. The incident caused
significant property damage and raised concerns about industrial safety and emergency
preparedness.
A search was run for incidents recorded by the Pipeline and Hazardous Materials Safety Administration
(PHMSA). Between 1980 and August 2024, the PHMSA database records 1,828 separate mobile
hazardous materials incidents both large and small occurring in the county. Of these, 1,692 occurred on
a highway, 95 occurred on rail lines, 39 occurred in the air, and one occurred on the water.
3.10.5 PROBABILITY
Determining the exact probability of a hazardous materials incident is challenging due to the variability
of factors involved. Smaller hazardous materials incidents are likely to occur frequently due to the large
volume of hazardous materials in the county, but a widespread event is less likely to occur due to the
controls and regulations in place at larger facilities. The following considerations may influence the
likelihood of such incidents:
• Presence of industrial facilities, including chemical plants and refineries
• Major transportation routes, such as highways, railways, and waterways
• Population density in urban areas
It is safe to say that minor hazardous materials incidents are a relatively routine occurrence across the
county. Large-scale hazardous materials incidents are much rarer.
3.10.6 CLIMATE CHANGE IMPACTS
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 18
Climate change has the potential to increase the number of hazardous materials incidents, due to
changes in population, environment, and production capacity. It is also expected that climate change
impacts may exacerbate the impacts of the incidents themselves, depending on the weather, location
and type of material.
3.10.7 VULNERABILITY ASSESSMENT
Vulnerability in a hazardous materials incident is highly contingent on the location of the incident and
the substance released.
3.10.7.1 People
• Health Risks - Hazardous materials can be toxic, flammable, corrosive, or reactive, posing
immediate and long-term health risks. Hazardous materials vary greatly in the types of health
risks they pose to humans, including the following potential health risks from hazardous
materials: thermal, radiological, asphyxiation, chemical, etiological, or mechanical (TRACEM).
• Population Density – Areas with high population density, including much of Ramsey County, can
increase the number of people potentially impacted by a hazardous material incident.
• Proximity to Facilities – Communities located near industrial plants, chemical storage facilities,
transportation routes, or waste disposal sites are at a greater risk of exposure. There are a
significant number of transportation routes (both rail and road) that traverse the county, on
which hazardous materials are carried every day. The City of Roseville has several fuel tank
facilities, with approximately 370 semi-trucks, carrying hazardous materials, entering and exiting
on a daily basis.
3.10.7.2 Property
• Damage to infrastructure – Hazardous materials can cause significant damage to buildings,
roads, bridges, and other infrastructure. Corrosive chemicals can degrade materials, and
explosions and fires can cause widespread damage.
• Economic Costs – the economic impact of hazardous materials incidents can be substantial,
including cleanup, property devaluation, and business interruptions.
• Long-term contamination – Contamination can persist in buildings and infrastructure, rendering
them unusable or requiring costs decontamination or demolition efforts.
3.10.7.3 Environment
• Water contamination – Hazardous materials can seep into groundwater or run off into rivers,
lakes, and reservoirs, contaminating drinking water and impacting aquatic ecosystems.
Jurisdictions, such as Gem Lake, utilize a well water infrastructure, and spills impacting
groundwater could have significant impacts to drinking water.
• Soil degradation – Hazardous material incidents can lead to soil contamination which can affect
plant growth and soil health. Contaminants can persist in the soil for long periods of time which
can make land unsuitable for habitation and/or agriculture.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 19
• Air pollution – Hazardous gases or particulates can be released into the air. These can impact air
quality and pose respiratory risks for humans and animals.
• Ecosystem disruption – Toxic substances can disrupt ecosystems, reduce biodiversity, and affect
food chain, possibly causing long-term ecological imbalances.
3.10.7.4 County and Community Operations
A hazardous materials incident can have a significant impact on a community. The impacts can be
immediate, short-term, and long-term, affecting various aspects of the community including health,
environmental, economy, and social well-being.
3.10.8 CONSEQUENCE ASSESSMENT
Impact on the Public
• Immediate and long-term health risks, including exposure to toxic substances, chemical burns,
respiratory issues, or poisoning.
• Potential for widespread panic or fear due to the nature of the hazardous material.
• Evacuation of affected areas, leading to temporary displacement and disruption of daily life.
Impact on Responders
• High risk of exposure to hazardous materials, requiring specialized protective equipment and
training.
• Challenges in managing the scene, including containment, decontamination, and medical
treatment.
• Potential injuries or fatalities among responders due to the dangerous nature of the incident.
• Strain on emergency response resources, including medical facilities, hazmat teams, and fire
services.
Continuity of Operations
• Disruption of critical services, including transportation, healthcare, and public utilities, due to
contamination or evacuation.
• Potential shutdown of government buildings or facilities in the affected area, delaying
administrative functions.
Impact on Property, Facilities, and Infrastructure
• Contamination of buildings, public spaces, and infrastructure, leading to costly cleanup and
decontamination efforts.
• Potential destruction or long-term damage to property due to explosions, fires, or chemical
corrosion.
• Temporary or permanent closure of affected facilities, impacting businesses, schools, and public
services.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 20
• Long-term implications for infrastructure integrity if materials seep into soil, groundwater, or air
systems.
Impact on the Environment
• Contamination of air, water, and soil, potentially affecting large areas and leading to short- and
long-term ecological damage.
• Destruction of natural habitats, with harmful effects on wildlife and plant life.
• Challenges in restoring affected environments, with potential for lasting degradation of
ecosystems.
• Risk of bioaccumulation of hazardous substances in the food chain, affecting both wildlife and
human populations.
Impact on the Economy of the Jurisdiction
• Significant economic losses due to business closures, property damage, and costs associated
with cleanup and decontamination.
• Potential long-term economic downturn if the incident affects key industries in the region.
• Increased healthcare costs due to treatment of affected individuals and long-term health
monitoring.
• Potential decrease in property values and attractiveness of the area for investment or
development.
Impact on Public Confidence in the Jurisdiction's Governance
• Erosion of public trust if the incident is perceived as preventable or if the response is seen as
inadequate.
• Increased scrutiny and criticism of regulatory and oversight agencies responsible for hazardous
materials management.
• Pressure to improve safety regulations, emergency response capabilities, and communication
strategies to prevent future incidents.
3.11 Summer Weather Hazards
3.11.1 PROFILE
The summer weather hazards chapter encompasses natural weather hazards most likely to occur in the
spring and summer months. The most common types of summer weather hazards experienced in
Ramsey County are described below.
• Extreme heat: The NWS does not have a set definition for extreme heat, but instead calibrates
the point at which forecasters warn residents based on the region's climate. For central states,
including Minnesota, Heat Advisories are issued when the heat index exceeds 100 degrees.
Excessive Heat Warnings are issued when the heat index exceeds 105 degrees.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 21
• Heatwave: Heatwaves are periods of abnormally hot weather generally lasting more than two
days. Heat waves can occur with or without high humidity.
• Hail: Hail forms inside a thunderstorm or other storms with strong updrafts of warm air and
downdrafts of cold water. If a water droplet is picked up by the updrafts, it can be carried well
above the freezing level. Water droplets freeze when temperatures reach 32 degrees Fahrenheit
(°F) or colder. As the frozen droplet begins to fall, it may thaw as it moves into warmer air
toward the bottom of the thunderstorm. However, the droplet may be picked up again by
another updraft and carried back into the cold air and refreeze. With each trip above and below
the freezing level, the frozen droplet adds another layer of ice. The frozen droplet, with many
layers of ice, falls to the ground as hail. Most hail is small and typically less than two inches in
diameter.
• Lightning: Lightning is a bright flash of electrical energy produced by a thunderstorm. All
thunderstorms produce lightning and are very dangerous. Lightning ranks as one of the top
weather killers in the U.S., where an average of 300 people are injured and 80 are killed each
year. Lightning can occur anywhere there is a thunderstorm, often strikes outside the heavy rain
in a thunderstorm, and may occur as far as 10 miles away from any rainfall.
Note that a single summer weather event may include one or more of these hazards.
3.11.2 LOCATION
All communities within Ramsey County are vulnerable to summer weather.
3.11.3 EXTENT
3.11.3.1 Extreme Heat and Heatwaves
Each NWS Forecast Office issues heat-related alerts as needed. Local offices often work with partners to
decide when to issue an alert for a specific area. The Heat Index is a measure of how hot it feels when
factoring in the relative humidity at a given location. This can be used as a decision-making tool when
issuing heat-related products. The Heat Index is provided as Figure 12.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 22
Figure 12. Heat Index
Source: www.weather.gov
Heat-related products are described in Table 15.
Table 15. NWS Heat-Related Products
Product Description
Excessive Heat Warning—Take
Action!
An Excessive Heat Warning is issued within 12 hours of the
onset of extremely dangerous heat conditions. The general
rule of thumb for this Warning is when the maximum heat
index temperature is expected to be 105° or higher for at
least 2 days and nighttime air temperatures will not drop
below 75°; however, these criteria vary across the country,
especially for areas not used to extreme heat conditions. If
you don't take precautions immediately when conditions are
extreme, you may become seriously ill or even die.
Excessive Heat Watches—Be
Prepared!
Heat watches are issued when conditions are favorable for
an excessive heat event in the next 24 to 72 hours. A Watch
is used when the risk of a heat wave has increased but its
occurrence and timing is still uncertain.
Heat Advisory—Take Action! A Heat Advisory is issued within 12 hours of the onset of
extremely dangerous heat conditions. The general rule of
thumb for this Advisory is when the maximum heat index
temperature is expected to be 100° or higher for at least 2
days, and nighttime air temperatures will not drop below
75°; however, these criteria vary across the country,
especially for areas that are not used to dangerous heat
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 23
conditions. Take precautions to avoid heat illness. If you
don't take precautions, you may become seriously ill or even
die.
Excessive Heat Outlooks—Be Aware! The outlooks are issued when the potential exists for an
excessive heat event in the next 3-7 days. An Outlook
provides information to those who need considerable lead
time to prepare for the event.
Source: www.weather.gov
3.11.3.2 Hail
Hail size typically refers to the diameter of the hailstones. Warnings and reports may report hail size
through comparisons with real-world objects that correspond to certain diameters. To be considered
severe, hail stones must be at least 1 inch in diameter. Hail naming convention, damage estimate,
description, and size are provided in Table 16.
Table 16. Hail Descriptions and Damage Estimates
Hail Name Damage Description Diameter
(in.)
Small Hail Unlikely Pea 0.25
Marble or Mothball 0.50
Penny or Dime 0.75
Nickel 0.88
Large Hail Minor damage Quarter 1.00
Half Dollar 1.25
Walnut or Ping Pong Ball 1.50
Golf ball 1.75
Very Large Hail Moderate damage Hen's Egg 2.00
Tennis Ball 2.50
Baseball 2.75
Giant Hail Major damage Teacup 3.00
Grapefruit 4.00
Softball 4.50
Source: www.weather.gov
3.11.3.3 Lightning
The threat of lightning is largely based on the likelihood that cloud-to-ground lightning (CG) from
thunderstorms will occur combined with the anticipated flash rate. With CG lightning, every strike is
potentially lethal and has the potential to contribute to other hazards such as wildfire. Flash rate is
defined in Table 17.
Table 17. CG Lightning Flash Rate
Term Description
Occasional CG lightning at the rate of 1 to 3 flashes per minute (about 5 to 15 flashes
per 5 minutes) associated with a given lightning storm.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 24
Frequent CG lightning at the rate of 4 to 11 flashes per minute (about 20 to 55 flashes
per 5 minutes) associated with a given lightning storm.
Excessive CG lightning rate of 12 flashes or more per minute (about 60 flashes or more
per 5 minutes) and is nearly continuous associated with a given lightning
storm.
Source: www.weather.gov
Lightning risk is also defined as low, moderate, or high as shown in Table 18.
Table 18. Lightning Risk
Level Definition
Low Risk Atmospheric conditions do not support frequent cloud-to-ground lightning
strikes.
Moderate Risk Thunderstorms are forecast to be scattered in coverage (30-50% chance).
Atmospheric conditions support frequent cloud-to-ground lightning strikes.
High Risk Thunderstorms are forecast to be numerous or widespread in coverage (60-
100% chance). Atmospheric conditions support continuous and intense
cloud-to-ground lightning strikes.
Source: www.weather.gov
3.11.4 HISTORY
Ramsey County has a significant history of damaging windstorms and tornadoes. The National Centers
for Environmental Information (NCEI) Storm Events Database was consulted for incident records.
According to NCEI records, there have been 243 significant summer weather incidents reported
between 1950 and July 2024. This dataset recorded five deaths and two injuries since 1950. Notable
summer weather hazard incidents since 1950 are displayed in Table 19.
Table 19. Notable Summer Weather Hazard Incidents in Ramsey County, MN
Date Type Deaths/
Injuries
Property
Damage
Description
August 9,
1998
Lightning 1/0 None
reported
One man died because of a lightning strike
while under a tree.
May 1, 2001 Hail 0/0 $2M Numerous vehicles and buildings were
damaged.
June 7, 2005 Lightning 0/0 None
reported
Lightning struck a home on Timberline Trail.
The northwest corner of the home caught fire
and sheetrock fell on a person lying in bed.
August 8,
2005
Lightning
0/0 None
reported
Lightning struck a home and a nearby tree on
Whitaker Street. The bolt that struck the
home damaged the electrical equipment
inside. The bolt that struck the tree caused
the tree to split in two, and one of the pieces
fell through a window.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 25
Date Type Deaths/
Injuries
Property
Damage
Description
July 24, 2009 Hail 0/0 $15k A strong cold front moved through the region
Friday morning and generated a line of strong
to severe thunderstorms that affected areas
from far east central Minnesota, into west
central Wisconsin. Several reports of golf ball
size hail were observed in the east metro of
the Twin Cities.
September
21, 2010
Hail 0/0 $5M Several reports of large hail, up to the size of
half dollars, occurred from the Highland Park
area of Saint Paul, northeast across the north
side of the city.
August 25,
2013
Excessive
Heat
0/216 None
reported
Heat indices of 105° F occurred during the
Minnesota State Fair. 216 people were
treated at State Fair medical aid stations for
heat-related illnesses. Of those 216, 10 were
transported to area hospitals. Minneapolis
schools also canceled outdoor athletic
practices during this period of extreme heat.
July 2015 Extreme
Heat
0/0 None
reported
Several observations across Ramsey County
measured heat indices over 105° F for two
days in a row. The highest heat index value
was 116° F.
8 Significant
Incidents
- 1/216 $7,015,000
total claimed
--
Sources: NCDC; 2019 Ramsey MHMP
3.11.5 PROBABILITY
Summer weather hazards are an annual occurrence and are likely to occur each year. Eight significant
summer weather incidents have occurred since 1970, giving a probability of approximately a 14.5%
chance of a significant summer weather incident occurring within any given year.
3.11.6 CLIMATE CHANGE IMPACTS
Climate change is expected to have dramatic impacts on weather patterns in Minnesota. These include
more extreme weather patterns, including increased periods of extreme heat, enhanced lightning
activity, changes in hail patterns and more intense storms. Climate change could have the following
impacts:
• Increased Extreme Heat: This includes more frequent and severe heatwaves, higher average
summer temperatures, and longer duration of hot spells. Minnesota is getting warmer,
especially winter nights in the northern parts of the state. Daily average minimum temperatures
during winter (Dec-Feb) have increased 4.9 degrees in southern Minnesota.
• Enhanced Lightning Activity: Increased atmospheric instability may lead to more
thunderstorms, with higher temperatures and humidity levels contributing to more frequent
lightning strikes.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 26
• Changes in Hail Patterns: There is the potential for increase in the size and frequency of hail due
to more intense thunderstorms, as well as shifts in the geographic distribution of hailstorms.
• More Intense Storms: Greater frequency of severe thunderstorms with high winds and heavy
rainfall and subsequent increased risk of flash flooding.
• Health Risks: Extreme heat can lead to increased heat-related illnesses and mortality and a
higher risk of respiratory problems due to poor air quality. Higher temperatures can exacerbate
air quality issues, leading to more smog and ground-level ozone.
• Economic Costs: Rising temperatures create a greater demand for energy to cool homes and
businesses, and there may be increased costs for repairing damage from severe weather
incidents. Ecosystem impacts can have trickle down effects on related industries such as fishing
and tourism. Likewise, agricultural impacts affect the agricultural and farming sectors.
• Ecosystem Disruptions: Increased heat, along with more frequent, intense, and prolonged
storms, may alter plant and animal behavior and distribution by stressing native species and
ecosystems. Over the past 50 years, Minnesota lakes have lost an average of 10 to 14 days of ice
cover, and July-August water temperatures have risen by 3.0 to 3.9°F, impacting lake and fish
health. Algae blooms, exacerbated by warmer water, can deplete oxygen levels, suffocating fish,
even those species like bass that typically thrive in warmer conditions. Northern tree species
such as paper birch, quaking aspen, balsam fir, and black spruce may decline and migrate
further north, while warmer-climate species like maples, oaks, and hickories could take their
place. These shifts in tree cover will also lead to changes in wildlife and soil habitats.
While the exact relationship between climate change and summer weather is complex and still under
active research, the evidence suggests that climate change is likely to impact the frequency, intensity,
and distribution of summer weather hazards in the Midwest. Improved understanding and modeling of
these changes are essential for developing effective mitigation and adaptation strategies.
3.11.7 VULNERABILITY ASSESSMENT
3.11.7.1 People
Extreme heat poses serious health risks, particularly for the elderly, children, and those with pre-existing
health conditions, as well as people without access to air conditioning. Extreme heat is the leading
weather-related killer in the United States, killing more people than other types of extreme weather.
Changing temperatures bring illnesses related to frequency and severity of allergic illnesses (e.g., asthma
and hay fever). Prolonged heatwaves can lead to heat exhaustion, heatstroke, and increased mortality
rates. During the second planning meeting, attendees noted that in Ramsey County, many of the recent
immigrants are not used to hotter weather and often live many people to a home, often without air
conditioning.
Hailstorms, often accompanying severe thunderstorms, can cause significant injury to individuals caught
outside and disrupt daily activities. Lightning presents another serious threat, with the potential to
cause direct injuries or fatalities and ignite fires, posing additional risks to both urban and rural
communities.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 27
3.11.7.2 Property
Extreme heat can cause asphalt and concrete to buckle, strain power grids due to increased air
conditioning usage, and degrade building materials, leading to higher maintenance and repair costs.
Hailstorms pose a significant threat to homes, vehicles, and agricultural assets, often resulting in
shattered windows, damaged roofs, and destroyed crops. These storms can also disrupt transportation
networks and necessitate costly repairs. Lightning strikes can cause power outages, fires, and severe
damage to electrical and communication systems.
3.11.7.3 Environment
The environment in the Midwest is particularly vulnerable to summer weather hazards such as extreme
heat, hail, and lightning. Extreme heat can lead to drought conditions, stressing water resources, and
reducing soil moisture, which negatively impacts plant and animal life. Prolonged high temperatures can
also alter ecosystems, driving some species to migrate while threatening others that cannot adapt
quickly enough. Hailstorms can cause significant physical damage to vegetation, strip leaves from trees,
and destroy crops, disrupting local ecosystems and agricultural productivity. Lightning, besides posing a
direct threat to wildlife, can ignite wildfires, which rapidly spread and devastate large areas of forest and
grassland, leading to habitat loss and long-term ecological shifts. These summer weather hazards
collectively strain the resilience of the Midwest's natural environment, disrupt the balance of local
ecosystems, and contribute to biodiversity loss.
3.11.7.4 County and Community Operations
Government and community operations in the Midwest are significantly vulnerable to summer weather
hazards such as extreme heat, hail, and lightning. Extreme heat can overwhelm public health systems
with heat-related illnesses and fatalities, strain energy resources due to increased air conditioning use,
and disrupt daily operations in schools, government buildings, and public transportation. Hailstorms can
cause extensive damage to public infrastructure necessitating costly repairs and diverting funds from
other essential services. Lightning can disrupt power and communication networks, leading to outages
that hinder emergency response efforts and critical services. These disruptions can impede the delivery
of essential services, compromise public safety, and place a significant financial burden on local
governments. The number of languages spoken in the county makes public messaging difficult.
3.11.8 CONSEQUENCE ASSESSMENT
Impact on the Public
• Increased risk of heat-related illnesses and fatalities, especially among vulnerable populations
(elderly, children, and those with pre-existing health conditions).
• Potential overburdening of healthcare facilities due to heat-related emergencies.
• Disruption of daily activities and potential evacuation of individuals from areas without
adequate cooling facilities.
• Extreme heat creates heat-related physical stress on the population and is exacerbated in the
metropolitan areas where greater amounts of heat-absorbing surfaces (e.g., asphalt and
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 28
concrete) trap heat and emit higher temperatures throughout the night. Injuries from hailstones
or lightning, particularly if individuals are caught outdoors.
• Damage to personal vehicles and homes leading to financial strain on households.
• Risk of lightning strikes causing injuries or fatalities to individuals outdoors.
• Potential for lightning-induced fires affecting residential areas and leading to evacuations.
Impact on Responders
• Increased risk of heat exhaustion, heatstroke, and hail or lightning strikes among emergency
responders.
• Need for additional resources and protocols to ensure responder safety in high temperatures.
Impact on Continuity of Operations
• Potential for power outages due to increased demand for electricity (air conditioning).
• Need for implementation of heat emergency plans and continuity strategies.
• Possible damage to government buildings, vehicles, and communication systems.
• Disruption of essential services and potential delays in government response and recovery
efforts.
Impact on Property, Facilities, and Infrastructure
• Strain on power grids and potential infrastructure failures due to high heat.
• Significant damage to buildings, vehicles, and outdoor infrastructure (e.g., traffic signals, power
lines) duet to hail or lightning.
• Damage to electrical systems, communication networks, and buildings due to lightning.
Impact on the Environment
• Stress on local ecosystems and wildlife, particularly aquatic systems due to higher water
temperatures.
• Damage to crops and natural vegetation due to hail.
• Forest and grass fires due leading to habitat destruction and air quality issues due to lightning.
Impact on the Economy of the Jurisdiction
• Potential impacts on agriculture and tourism sectors.
• Potential disruptions to businesses, leading to loss of revenue and jobs.
Impact on Public Confidence in the Jurisdiction's Governance
• Public dissatisfaction if government response is perceived as inadequate, particularly in
providing cooling centers and emergency services.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 29
3.12 Tornado and Windstorm
3.12.1 PROFILE
High winds can be produced during severe thunderstorms, with other strong weather systems, or by
flow down a mountain. There are several types of damaging winds possible in Minnesota:
• Straight-line winds describe any thunderstorm wind that is not associated with rotation and is
used mainly to differentiate from tornadic winds.
A downdraft is a small-scale column of air that rapidly sinks toward the ground.
A downburst is the general term used to broadly describe macro and microbursts.
Downburst is the general term for all localized strong wind events that are caused by a
strong downdraft within a thunderstorm, while microburst simply refers to an especially
small downburst that is less than 4 km across.
A gust front is the leading edge of rain-cooled air that clashes with warmer thunderstorm
inflow. Gust fronts are characterized by a wind shift, temperature drop, and gusty winds out
ahead of a thunderstorm. Sometimes the winds push up air above them, forming a shelf
cloud or detached roll cloud.
A derecho is a widespread, long-lived windstorm that is associated with a band of rapidly
moving showers or thunderstorms. A typical derecho consists of numerous microbursts,
downbursts, and downburst clusters. By definition, if the wind damage swath extends more
than 240 miles (about 400 kilometers) and includes wind gusts of at least 58 mph (93 km/h)
or greater along most of its length, then the event may be classified as a derecho.
A haboob is a wall of dust that is pushed out along the ground from a thunderstorm
downdraft at high speeds.
• Tornadoes are defined as violently rotating columns of air extending from thunderstorms to the
ground, with wind speeds between 40-300 mph. They develop under 3 scenarios: (1) along a
squall line; (2) in connection with thunderstorm squall lines during hot, humid weather; and (3)
in the outer portion of a tropical cyclone. Funnel clouds are rotating columns of air not in
contact with the ground; however, the column of air can reach the ground very quickly and
become a tornado.
3.12.2 LOCATION
All communities within Ramsey County are vulnerable to windstorms and tornadoes. Minnesota lies
along the northern border of Tornado Alley, a loosely defined area first described in 1952 in the central
United States where tornadoes are more likely to occur than in other parts of the continent.
Interestingly, tornado activity has been shifting away from the Great Plains and toward the Midwestern
and Southeast U.S. according to a report published in the April 2024 issue of the Journal of Applied
Meteorology and Climatology.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 30
Figure 13. Tornado Alley
Source: Encyclopedia Britannica
3.12.3 EXTENT
Winds are classified by the NWS using the categories shown in Table 20.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 31
Table 20. Wind Speed Classifications
Description Speed
Strong Wind Gusts Between 39 mph and 57 mph
Damaging Wind Gusts Between 58 mph and 74 mph causing minor damage
Very Damaging Wind Gusts Between 75 mph and 91 mph causing moderate
damage
Violent Wind Gusts Greater than 92 mph causing major damage
Source: National Weather Service
Since 2007, tornado strength in the United States has been ranked based on the Enhanced Fujita scale
(EF scale), replacing the Fujita scale introduced in 1971. The EF scale, shown in Table 21 uses similar
principles to the Fujita scale, with 6 categories from 0-5, based on wind estimates and damage caused
by the tornado. The EF Scale is used extensively by the NWS in investigating tornadoes (all tornadoes are
now assigned an EF Scale number), and by engineers in correlating damage to buildings and techniques
with different wind speeds caused by tornadoes. It uses three-second gusts estimated at the point of
damage based on a judgment of damage.
When tornado-related damage is surveyed, it is compared to a list of Damage Indicators (DIs) and
Degrees of Damage (DoD) which help estimate better the range of wind speeds the tornado likely
produced. Each damage indicator is rated on a scale of 1-8 DoD. From that, a rating (from EF0 to EF5) is
assigned.
Table 21. Enhance Fujita Scale
EF Rating 3 Second Gust (mph) Description
0 65-85 Light damage. Some damage to chimneys; branches broken
off trees; shallow-rooted trees pushed over; sign boards
damaged.
1 86-110 Moderate damage. Peels surface off roofs; mobile homes
pushed off foundations or overturned; moving autos blown
off roads.
2 111-135 Considerable damage. Roofs torn off frame houses; mobile
homes demolished; boxcars overturned; large trees snapped
or uprooted; light-object missiles generated; cars lifted off
ground.
3 136-165 Severe damage. Roofs and some walls torn off well-
constructed houses; trains overturned; most trees in forest
uprooted; heavy cars lifted off the ground and thrown.
4 166-200 Devastating damage. Well-constructed houses leveled;
structures with weak foundations blown away some
distance; cars thrown, and large missiles generated.
5 200+ Incredible damage. Strong frame houses leveled off
foundations and swept away; automobile-sized missiles fly
through the air in excess of 100 meters (109 yds); trees
debarked; incredible phenomena will occur.
Source: National Weather Service
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 32
3.12.4 HISTORY
Ramsey County has a significant history of damaging windstorms and tornadoes. The NCEI Storm Events
Database was consulted for incident records.
3.12.4.1 Windstorm History
According to NCEI records, there have been 168 significant non-tornadic windstorm incidents reported
between 1950 and July 2024, with wind speeds of up to 99 mph. These winds can inflict damage to
buildings and in some cases, overturn high-profile vehicles. This dataset recorded zero deaths, 11
injuries, and over $25 million in property damage since 1950. Notable non-tornadic windstorm incidents
since 1950 are displayed in Table 22.
Table 22. Notable Non-Tornadic Windstorm Incidents in Ramsey County, MN
Date Location Magnitude
(mph)
Deaths/
Injuries
Property
Damage
Description
April 26,
1984
u/k u/k 0/6 u/k --
May 1998 Saint Paul 100 0/0 $48M A derecho damaged 2,000
homes and fell thousands
of trees.
May 9,
2004
Saint Paul 72 0/0 $330k Many reports of tree and
structure damages.
September
21, 2005
Countywide 75 0/1 $25M Many homes were
destroyed by falling trees,
and the roof of a mobile
home in Mounds View was
blown off. Roads were
blocked throughout the
county.
August
2007
Saint Paul 69 0/1 One home was destroyed
when a tree fell on it, and
one man was injured by a
window crashing in on
him. Part of the
grandstand’s roof at the
State Fair was blown off,
and dozens of vendor
booths were damaged.
XCEL Energy reported
250,000 outages in the
metro region.
June 10,
2012
Saint Paul 70 0/0 $50k Blew down a large swath
of trees from the Highland
Park area toward Randolph
Avenue.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 33
Date Location Magnitude
(mph)
Deaths/
Injuries
Property
Damage
Description
November
10, 2012
Saint Paul 64 0/0 $50k Most of the damage was
the result of trees landing
on cars, houses and sheds.
July 5,
2016
Lauderdale 60 0/0 $25k 138,000 people were
without power during the
storm.
June 11,
2017
Saint Paul 58 0/2 u/k --
August 2,
2022
Little Canada,
Saint Paul,
Vadnais
Heights
60 0/0 $30k --
10
Significant
Incidents
-- -- 0/10 $73,485,000
total
claimed
--
Sources: NCEI; 2019 Ramsey MHMP
3.12.4.2 Tornado History
According to NCEI records, eight tornadoes were reported in Ramsey County between 1950 and July
2024, causing one death, 168 injuries, and over $151 million in reported property damage. Tornado
classification ranged from F0/EF0 to F4. Notable tornadic incidents since 1950 are displayed in Table 23.
Table 23. Notable Tornadic Incidents in Ramsey County, MN
Date Location Magnitude Deaths/
Injuries
Property
Damage
Description
May 6,
1965
u/k F4 0/108 $25M Part of one of the worst tornado
outbreaks in Minnesota history.
Six tornadoes affected six
counties around the Twin Cities
with 13 fatalities and over 500
injured.
June 28,
1979
u/k F1 0/0 $250k Part of another large outbreak of
16 tornadoes.
June 14,
1981
Roseville F3 1/60 $25M The Lt. Governor activated 120
National Guard military police to
prevent the looting of damaged
businesses and homes.
April 26,
1984
St. Anthony F3 1/53 $25M Four churches and a mall were
among the damages.
May 15,
1998
Roseville F1 0/0 $150M Seven houses were destroyed,
and 102 severely damaged.
Along with the tornado there
was widespread hail.
May 22, Mounds EF-0 0/0 $20k Most of the damage was due to
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 34
2011 View sporadic trees being blown
down.
July 18,
2015
Shoreview
(North
Oaks)
EF-0 0/0 $500k The highest numbers of toppled
and snapped trees occurred at
Deep Lake. Some trees fell on
houses, vehicles, and other
structures.
August
27, 2022
Saint Paul EF-0 0/0 $150k Several homes had damage
(mainly roof damage) which
occurred as multiple large trees
were either uprooted or blown
down along the tornado's path.
The maximum width was 100
yards with a peak wind of 75
mph.
Sources: NCDC; 2019 Ramsey MHMP
3.12.5 PROBABILITY
Windstorms are an annual occurrence and are likely to occur each year. Seven significant tornadoes
have occurred since 1970, giving a probability of approximately a 13% chance of a significant tornado
occurring within any given year.
3.12.6 CLIMATE CHANGE IMPACTS
While the exact relationship between climate change and tornadoes is complex and still under active
research, the evidence suggests that climate change is likely to impact the frequency, intensity, and
distribution of severe windstorms and tornadoes in the Midwest.
3.12.7 VULNERABILITY ASSESSMENT
3.12.7.1 People
All individuals who live, work, and recreate within Ramsey County are at risk of impact from windstorms
and tornadoes. The most likely impacts are from electrical outages (which affects heating/cooling, food
storage, communications, and use of durable medical equipment), although individuals may also suffer
transportation disruptions from downed trees, medical conditions from debris cleanup, auto accidents,
and injuries or fatalities from downed trees or blown objects. Taking cover during inclement weather
reduces many of these impacts.
3.12.7.2 Property
In "strong wind" conditions, small branches break off trees, and loose objects are blown about. Isolated
occurrences of wind damage to porches, carports, awnings, or pool enclosures may take place. Power
outages are common, especially in winter months.
In "damaging wind" conditions, wind damage occurs to unanchored mobile homes, porches, carports,
awnings, and pool enclosures, with some shingles blown from roofs. Large branches break off trees,
with weak or diseased trees blown down. Loose objects are easily blown about and can become
dangerous projectiles. Power outages are likely to be more extensive. Other utility outages, such as
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 35
communication, may also occur. Damaging high winds are considered extremely dangerous for high-
profile vehicles.
In “very damaging” and “violent wind” conditions, including tornadic winds, a wide range of impacts on
property may occur, depending on intensity, duration, and the vulnerability of the structures in their
path. This may include but is not limited to, uplifting of roofs; severe damage up to the complete
destruction of walls, windows, and doors; larger projectiles including vehicles; and widespread and long-
lasting power outages.
3.12.7.3 Environment
The environment is at high exposure to windstorms and tornadoes. Common types of environmental
damage include severe damage to trees that can lead to habitat loss and soil erosion, wind erosion in
agricultural areas leading to reduction of soil fertility and dust storms, wildlife displacement including
the destruction of nesting sites, increased debris in water bodies leading to disruption of aquatic
habitats, and the introduction of invasive species.
3.12.7.4 County and Community Operations
Damaging windstorms and tornadic incidents can have significant impacts on County and community
operations. Emergency services may be overwhelmed and communication, including 911, may be
damaged leading to difficulties in coordinating response efforts. Utility and transportation infrastructure
may be compromised, delaying assistance. Public health may also be impaired by disruptions to
sanitation and crowded shelters. Public services may also be disrupted, including schools, libraries,
parks, and community centers, affecting community resources and recreation.
3.12.8 CONSEQUENCE ASSESSMENT
Impact on the Public
• Significant risk of injuries and fatalities, especially for individuals caught in the path of tornadoes
or in structures unable to withstand high winds.
• Displacement of residents due to destroyed or severely damaged homes.
• Mental health impacts, including trauma and stress, particularly among children and those who
experience severe losses.
Impact on Responders
• High risk of injury or death for responders during rescue and recovery operations in hazardous
conditions.
• Strain on emergency services due to increased demand for rescue, medical, and logistical
support.
• Potential for responder fatigue and mental health challenges due to prolonged and intense
operations.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 36
Impact on Continuity of Operations
• Disruption of government operations due to damage to administrative buildings,
communication networks, and essential infrastructure.
• Potential delays in providing public services, impacting community support and recovery efforts.
Impact on Property, Facilities, and Infrastructure
• Extensive damage or destruction of residential, commercial, and industrial buildings, including
critical infrastructure, including power lines, water supply systems, and transportation networks.
• High repair and reconstruction costs, leading to prolonged recovery periods.
Impact on the Environment
• Uprooting of trees and destruction of natural habitats, impacting local wildlife.
• Potential for hazardous material spills from damaged industrial sites, contaminating soil and
water sources.
Impact on the Economy of the Jurisdiction
• Economic losses due to business closures, property damage, and interruption of commercial
activities.
• Significant financial burden on local government and residents for recovery and rebuilding
efforts.
• Potential decline in property values and loss of tax revenue.
Impact on Public Confidence in the Jurisdiction's Governance
• Public scrutiny and potential dissatisfaction with the government's preparedness and response
efforts.
3.13 Winter Weather Hazards
3.13.1 PROFILE
According to the NWS, a winter weather event is “a winter weather phenomenon (such as snow, sleet,
ice, wind chill) that impacts public safety, transportation, and/or commerce”. The most common types
of winter weather phenomena experienced in Ramsey County are described below.
• Blizzard: A dangerous winter storm that contains large amounts of snow or blowing snow,
coupled with winds above 35mph and visibility less than a quarter of a mile.
• Extreme cold: The NWS doesn't have a set definition for extreme cold, but instead calibrates the
point at which forecasters warn residents based on the region's climate. In Ramsey County, the
NWS issues “extreme cold” warnings when it feels like -25° F or colder across a wide area for
several hours.
• Ice storm: A storm that deposits at least .25” of ice on exposed surfaces.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 37
Note that a single winter weather incident may include one or more of these, or other, winter
phenomena.
3.13.2 LOCATION
All communities within Ramsey County are vulnerable to winter weather.
3.13.3 EXTENT
Winter weather is typically forecasted three to seven days in advance by the NWS and can lead to the
issuance of a winter weather watch, warning, or advisory in a Hazardous Weather Outlook bulletin.
There are several types of these notices depending on conditions. Forecast certainty increases as the
time for storm onset decreases.
3.13.3.1 Winter Weather Watch
A watch is issued 24 to 72 hours in advance when there is a 50 to 80% chance of hazardous winter
weather meeting warning thresholds. It aims to give enough lead time for people to prepare and take
necessary actions.
Table 24. Winter Weather Watch Types
Watch Type Description
Winter Storm Watch Conditions are favorable for a winter storm event (heavy
sleet, heavy snow, ice storm, heavy snow and blowing snow
or a combination of events) to meet or exceed local winter
storm warning criteria in the next 24 to 72 hours. Criteria for
snow is 7 inches or more in 12 hours or less; or 9 inches or
more in 24 hours covering at least 50 percent of the zone or
encompassing most of the population. Use "mid-point" of
snowfall range to trigger a watch (i.e. 5 to 8 inches of snow =
watch). Criteria for ice is 1/2 inch or more over at least 50
percent of the zone or encompassing most of the
population. This includes lake-effect snow.
Wind Chill Watch Conditions are favorable for wind chill temperatures to meet
or exceed local wind chill warning criteria in the next 24 to
72 hours. Wind chill temperatures may reach or exceed -
25°F.
Source: National Weather Service
3.13.3.2 Winter Weather Warning
These products are issued when hazardous winter weather is occurring, imminent, or highly likely (over
80% probability). A warning indicates conditions that threaten life or property.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 38
Table 25. Winter Weather Warning Types
Warning Type Description
Blizzard Warning Blizzard event is imminent or expected in the next 12 to 36
hours. Sustained wind or frequent gusts greater than or
equal to 35 mph will accompany falling and/or blowing snow
to frequently reduce visibility to less than 1/4 mile for three
or more hours.
Ice Storm Warning An ice storm event is expected to meet or exceed local ice
storm warning criteria in the next 12 to 36 hours. Criteria for
ice is 1/2 inch or more over at least 50 percent of the zone
or encompassing most of the population.
Winter Storm Warning A winter storm event (heavy sleet, heavy snow, ice storm,
heavy snow and blowing snow or a combination of events) is
expected to meet or exceed local winter storm warning
criteria in the next 12 to 36 hours. Criteria for snow is 7
inches or more in 12 hours or less; or 9 inches or more in 24
hours covering at least 50 percent of the zone or
encompassing most of the population. Use "mid-point" of
snowfall range to trigger warning (i.e 5 to 8 inches of snow =
warning). Criteria for ice is 1/2 inch or more over at least 50
percent of the zone or encompassing most of the
population.
Wind Chill Warning Wind chill temperatures are expected to meet or exceed
local wind chill warning criteria in the next 12 to 36 hours.
Wind chill temperatures may reach or exceed -25°F.
Source: www.weather.gov
3.13.3.3 Winter Weather Advisory
These products are issued when hazardous winter weather is occurring, imminent, or highly likely (over
80% probability). An advisory is for less serious conditions that cause significant inconvenience and
could become life-threatening if caution is not exercised.
Table 26. Winter Weather Advisory Types
Advisory Type Description
Winter Weather Advisory A winter storm event (sleet, snow, freezing rain, snow and
blowing snow, or a combination of events) is expected to
meet or exceed local winter weather advisory criteria in the
next 12 to 36 hours but stay below warning criteria. Criteria
for snow is 4 inches or more in 12 hours or less covering at
least 50 percent of the zone or encompassing most of the
population. Use "mid-point" of snowfall range to trigger
advisory (i.e 2 to 5 inches of snow = advisory). Criteria for ice
is any ice accumulation less than 1/2 inch over at least 50
percent of the zone or encompassing most of the
population. Winter Weather Advisory can also be issued for
black ice. This is optional.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 39
Wind Chill Advisory Wind chill temperatures are expected to meet or exceed
local wind chill advisory criteria in the next 12 to 36 hours.
Wind chill temperatures may reach or exceed -15°F.
Source: www.weather.gov
3.13.4 HISTORY
Ramsey County has a significant history of damaging windstorms and tornadoes. The NCEI Storm Events
Database was consulted for incident records.
According to NCEI records, there have been 109 significant winter weather incidents reported between
1950 and July 2024. This dataset recorded five deaths and two injuries since 1950. Notable winter
weather incidents since 1950 are displayed in Table 27.
Table 27. Notable Winter Weather Incidents in Ramsey County, MN
Date Type Deaths/
Injuries
Description
January 17,
1996
Ice storm 0/0 Up to 1" of ice accumulated over much of the
Minneapolis/Saint Paul region, resulting in significant
tree damage and power outages. More than 180,000
metro residents were without power, and 5 Red
Cross shelters were open to assist people who were
forced from their homes due to lack of heat.
February 2,
1996
Extreme cold/
wind chill
0/0 A new record low temperature for Minnesota was set
in the town of Tower at -60° F. Numerous record low
temperatures were set during the period at St. Cloud,
Rochester and the Twin Cities. Minneapolis/Saint
Paul set 3 new record low temperatures as well as
recording the 2nd coldest day on record. A mean
temperature of -25° F was measured that day with a
high of -17° F and a low of -32° F in the Twin Cities.
This was within 2 degrees of tying the all-time record
low temperature set in the Twin Cities and the
coldest temperature recorded this century. Many
central and southern Minnesota locations set new
record low temperatures. The Governor closed all
schools that day.
January 12,
2000
Heavy snow 0/0 9" of snow fell at the Twin Cities International
Airport, and the Minnesota Highway Patrol
responded to over 325 crashes in the Twin Cities –
however, most were minor without injuries.
January 19,
2001
Heavy snow 0/0 8" of snow was recorded at the Twin Cities
International Airport.
January 15,
2005
Cold/ wind chill 1/0 A disabled woman was found dead of exposure
outside of Como Park Conservatory. The low
temperature during the night that she was missing
was 9 degrees below zero.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 40
Date Type Deaths/
Injuries
Description
January 15,
2009
Cold / wind chill 2/0 Wind chill fell below -35° F.
December
10, 2010
Winter storm 0/0 This was the biggest snowstorm since the Halloween
Blizzard of 1991, and the average snowfall in Ramsey
County was 18".
February 20,
2011
Winter storm 0/0 Lightning was observed by several people, amidst a
storm that brought 12-16" of snow.
December
31, 2011
Winter weather 0/0 Heavy, wet snow fell during the holiday, resulting in
numerous accidents across the county.
December 9,
2012
Winter storm 0/0 12-16" of snow were reported across the county.
January 2014 Extreme cold/
wind chill
0/0 Wind chill values dropped below -35° F for several
hours, during a prolonged period of cold. Propane
supplies in the region became very low, leading to
the Governor declaring a Peacetime State of
Emergency. Earlier in the month the Governor
canceled all public-school classes in the state due to
extreme wind chills. It was the first such closing in 17
years.
February 2,
2016
Winter storm 0/0 10-13" of snow fell, resulting in 175 flights canceled
or delayed at the Minneapolis-Saint Paul
International Airport.
December
12, 2016
Extreme cold/
wind chill
1/1 A woman froze to death in Saint Paul, outside of her
apartment building when the wind chill dropped to -
19° F.
January 1,
2018
Extreme cold/
wind chill
1/1 A man was found in Saint Paul who had died from
exposure.
January 22,
2018
Winter storm 0/0 8-12" of snow fell across the county.
April 13,
2018
Winter storm 0/0 Multiple waves of winter precipitation occurred,
including sleet and snow, resulted in total snowfall
amounts of 16-20".
16 Significant
Incidents
-- 5/2 --
Sources: NCEI and 2019 Ramsey MHMP
3.13.5 PROBABILITY
Winter storms affect Ramsey County each year, so there is a nearly 100% probability of winter weather
in a single year. Extreme cold temperatures also affect the county nearly every year. The amount of
snow and ice, the number of blizzards, and days of sub-zero temperatures each year are unpredictable.
3.13.6 CLIMATE CHANGE IMPACTS
Climate change may affect winter storms in the Midwest United States in several ways:
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 41
• Temperature Fluctuations: Temperature fluctuations are increasingly causing cycles of melting
and refreezing, which heightens the risk of ice storms and hazardous driving conditions. In
Minnesota, most of the observed warming has occurred during the coldest periods. Since
records began in January 1895, average daily low temperatures have increased at more than
twice the rate of high temperatures. The winter season (December through February) has
warmed 2-3 times faster than summer (June through August).
This winter warming has accelerated in recent decades. From 1970 to 2021, average daily winter
low temperatures rose over 15 times faster than summer high temperatures. The frequency of
extreme cold temperatures, such as -35°F in northern Minnesota and -25°F in the southern
region, has decreased by up to 90%. While Minnesota will continue to experience periodic
severe cold spells, the long-term decline in extreme cold is almost certain to persist.
• Increased Intensity: Warmer temperatures can lead to more moisture in the atmosphere,
potentially resulting in heavier snowfall and more intense winter storms.
• Frequency of Extreme Events: While overall winter precipitation might decrease in some areas,
the frequency of extreme winter weather events could increase.
• Shift in Snowfall Patterns: Changes in temperature and precipitation patterns could shift where
and when snow falls, affecting traditional snowfall regions and potentially leading to unexpected
snowstorms in areas that usually receive less snow.
• More Rain than Snow: Warmer winter temperatures might lead to more winter precipitation
falling as rain rather than snow, increasing the risk of flooding and reducing snowpack.
• Prolonged Storm Duration: Changes in atmospheric circulation patterns could lead to slower-
moving storms, resulting in longer-lasting and potentially more damaging winter weather
events.
• Changes in Storm Tracks: Alterations in the jet stream and other atmospheric patterns may
change the paths that winter storms take, affecting which areas are most impacted.
• Increased Energy Costs: More intense and frequent storms could lead to higher energy
demands for heating and storm response, impacting infrastructure and increasing costs for
residents.
• Public Health Impacts: Greater variability and intensity in winter storms can lead to increased
risks to public health, such as hypothermia, frostbite, and accidents related to icy conditions.
While the exact relationship between climate change and tornadoes is complex and still under active
research, the evidence suggests that climate change is likely to impact the frequency, intensity, and
distribution of winter weather in the Midwest. Improved understanding and modeling of these changes
are essential for developing effective mitigation and adaptation strategies.
3.13.7 VULNERABILITY ASSESSMENT
3.13.7.1 People
Blizzards can cause whiteout conditions, making travel dangerous and leading to numerous accidents.
They can also disrupt transportation and supply chains, leaving people stranded and unable to access
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 42
essential services. Extreme cold poses serious health risks such as hypothermia and frostbite,
particularly for the elderly, young children, and those without adequate heating. Unhoused individuals
and those living in poorly insulated homes are especially at risk. Ice storms create hazardous conditions
by coating roads, power lines, and trees with ice, often resulting in widespread power outages and
dangerous driving conditions. The loss of power can leave people without heat, light, and
communication, exacerbating the risks, especially for those dependent on electricity for medical devices.
Additionally, ice can make walkways treacherous, increasing the risk of falls.
3.13.7.2 Property
Blizzards can lead to significant snow accumulation, causing roofs to collapse under the weight. Extreme
cold can cause pipes to freeze and burst, resulting in extensive water damage and costly repairs for
homes and businesses. It can also strain heating systems, leading to potential failures during peak
demand periods. Ice storms are particularly damaging as they coat power lines, trees, and structures
with a heavy layer of ice. This can cause trees to fall and power lines to snap, leading to widespread
power outages that may take days or even weeks to repair. The combined effects of these winter
weather events pose significant challenges to maintaining the safety and functionality of property and
infrastructure.
3.13.7.3 Environment
Winter weather can alter habitats and potentially disrupt the food sources and migratory patterns of
wildlife. Heavy snow cover and ice accumulation can damage vegetation, particularly trees and shrubs
that are not adapted to withstand such weight, leading to long-term ecological impacts. Extreme cold
spells can be detrimental to both flora and fauna, with prolonged exposure to freezing temperatures
causing frost damage to plants and endangering animals that lack sufficient shelter or are unable to find
adequate food. Additionally, ice buildup on rivers and lakes can impact aquatic ecosystems by altering
water flow and potentially causing fish kills due to reduced oxygen levels. The cumulative effect of these
winter weather events can lead to significant disruptions in the natural environment, affecting
biodiversity and the overall health of ecosystems.
3.13.7.4 County and Community Operations
Government and community operations can be greatly impacted by winter weather. Blizzards and ice
storms can cripple transportation systems, making roads impassable and hindering the movement of
emergency vehicles, public transportation, and supply chains. Extreme cold can strain public
infrastructure, leading to increased demand for heating and energy, which can overwhelm utilities and
cause power outages. Ice storms are particularly devastating as they can lead to widespread power
outages by bringing down power lines and damaging infrastructure. The result of any of these can halt
government operations, disrupt communication networks, and impede the delivery of critical services.
Additionally, the cleanup and repair efforts following such events can place a significant financial burden
on local governments and communities, diverting resources from other important projects and services.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 43
3.13.8 CONSEQUENCE ASSESSMENT
Impact on the Public
• Risk of injuries and fatalities due to exposure, traffic accidents, and falls on icy surfaces, and
exacerbation of existing health conditions, such as cardiovascular and respiratory issues.
• Isolation due to impassable roads, leading to shortages of food, water, and medical supplies.
• Increased demand on healthcare facilities due to weather-related injuries and illnesses.
• Power outages caused by ice accumulation on power lines and trees, leading to heating issues
and potential carbon monoxide poisoning from alternative heating sources.
Impact on Responders
• Difficult and hazardous conditions for emergency responders, increasing the risk of injuries
during response efforts.
• Delayed response times due to impassable roads and treacherous conditions.
• Increased demand for emergency services, leading to responder fatigue and resource depletion.
Continuity of Operations
• Disruption of government operations due to office closures and staff inability to commute.
• Strain on infrastructure, such as heating systems and power grids, impacting the ability to
maintain essential services.
Impact on Property, Facilities, and Infrastructure
• Structural damage to buildings and homes due to heavy snow loads and wind.
• Risk of burst pipes and water damage in homes and public facilities.
• Increased wear and tear on heating systems, potentially leading to failures and costly repairs.
• Damage to power lines, trees, and structures from ice accumulation.
Impact on the Environment
• Potential for water contamination from road salt and chemical de-icers.
• Damage to trees and vegetation from heavy snow and ice accumulation.
• Stress on local wildlife and ecosystems, particularly aquatic systems that may freeze over.
Impact on the Economy of the Jurisdiction
• Economic losses from business closures, supply chain disruptions, and increased costs for snow
and ice removal.
• Increased energy costs for heating, impacting household budgets and business operations.
Impact on Public Confidence in the Jurisdiction's Governance
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 44
• Public dissatisfaction if government response is perceived as inadequate or slow, particularly in
terms of snow and ice removal, power restoration, and emergency services.
• Potential erosion of trust if communication is not clear, timely, and effective during and after
the event.
3.14 Human-Caused Hazards
3.14.1 PROFILE
Many human-caused hazards may affect Ramsey County. These include, but are not limited to:
• Active shooter/hostile incident: A situation in which one or more individuals are actively
engaged in killing or attempting to kill people in a populated area, typically using firearms. These
incidents are characterized by their unpredictability and rapid evolution, often involving multiple
victims and posing significant threats to public safety.
• Civil Unrest: A situation in which one or more individuals are actively engaged in killing or
attempting to kill people in a populated area, typically using firearms. These incidents are
characterized by their unpredictability and rapid evolution, often involving multiple victims and
posing significant threats to public safety.
• Cyberattack: A deliberate and malicious attempt by an individual or group to breach the
information systems of another individual, organization, or government. These attacks aim to
steal, alter, or destroy data, disrupt operations, or cause harm in various other ways.
Cyberattacks can take many forms, including malware, phishing, Denial-of-Service (DoS),
ransomware, Man-in-the-Middle (MitM), SQL injection, and zero-day exploits. Cyberattacks can
cause significant financial, operational, and reputational damage.
• Terrorism: The unlawful use of violence or threats of violence, especially against civilians, to
create fear and achieve political, religious, or ideological objectives. Terrorism can be
perpetrated by individuals, groups, or state-sponsored actors and often aims to influence an
audience beyond the immediate victims. Examples of terrorism include bombings, shootings,
hijackings, kidnappings, and cyberattacks that are intended to cause widespread disruption or
fear.
Although not natural hazards, these hazards have been included to address and reduce the risks they
pose to public safety, infrastructure, and essential services.
3.14.2 LOCATION
Active shooter events are most likely to take place in locations with high concentrations of people, such
as schools, workplaces, shopping centers, places of worship, and public events. These settings are often
targeted due to the presence of numerous potential victims and the ability to create widespread fear
and disruption.
Civil unrest is most likely to take place in urban areas and locations where large groups of people can
gather, such as city centers, public squares, government buildings, and university campuses. These areas
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 45
are often chosen for protests and demonstrations due to their visibility, accessibility, and symbolic
significance.
Cyberattacks are most likely to target critical infrastructure, financial institutions, government agencies,
healthcare systems, large corporations, and any organizations that handle sensitive or valuable data.
Additionally, cyberattacks can affect individual users through personal devices, social media accounts,
and online services. These targets are chosen due to the potential for significant disruption, financial
gain, or access to sensitive information.
Terrorism is most likely to take place in high-profile public spaces, government buildings, transportation
hubs, tourist attractions, and large gatherings or events such as concerts, festivals, or sports arenas.
These locations are targeted for their potential to cause maximum casualties, widespread fear, and
significant media attention.
3.14.3 EXTENT
The extent of a human-caused hazard can be defined by several key factors:
• Geographic Scope: The specific geographical area affected by the hazard, which could range
from a single location (e.g., a building or city block) to a broader region or even global impact in
the case of cyberattacks.
• Intensity and severity: The level of violence, disruption, or damage caused by the hazard,
including casualties, injuries, property damage, and economic impact.
• Duration: The period over which the hazard persists, from the initial incident to the resolution
or containment by authorities.
• Psychological and social impact: The emotional and psychological effects on individuals and
communities, including fear, trauma, and social unrest.
• Response and recovery efforts: The effectiveness and timeliness of emergency response, law
enforcement actions, and recovery efforts to mitigate the hazard's effects and restore normalcy.
• Broader implications: The potential for the hazard to impact societal norms, public policy,
international relations, and the overall sense of security and resilience within affected
communities.
Defining the extent of a human-caused hazard involves assessing these dimensions to understand its full
impact and implications for preparedness, response, and mitigation efforts.
3.14.4 HISTORY
Ramsey County has several notable human-caused hazard incidents in its history. News archives and
local government agencies were consulted to obtain this information. According to these records and
accounts, there have been at least 5 significant human-caused hazard incidents reported between 1950
and July 2024. This dataset recorded at least 3 deaths and an indeterminable number injuries since
1950; at least $354M in damages were recorded from these incidents. Notable incidents since 1950 are
displayed in Table 28.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 46
Table 28. Notable Human-Caused Hazard Incidents in Ramsey County, MN
Date Type Deaths/
Injuries
Property
Damage
Description
July 20, 1967 Civil
unrest
0/24 $4.2M In response to a pre-meditated plot by Black
Panther leader Stokely Carmichael. Widespread
violence, including rock and bottle-throwing at
law enforcement and fires set to businesses
along Plymouth Avenue, quickly engulfed the
area and lasted three days.
April 4, 1968 Civil
unrest –
Active
shooter
1/0 u/k Following the assassination of Dr. Martin Luther
King, a wave of protesters marched in the
streets but remained non-violent. One
individual, stating anger at King’s death, vowed
to avenge it by killing the first white man he saw
and did so using a .45 caliber weapon.
September 1,
2008
Civil
unrest
0/0 u/k In a crowd of 10,000 protesters at the
Republican National Convention, a group of
approximately 300 turned to civil unrest and
broke windows, slashed tires, and harassed
delegates. Arrests led to the discovery of
additional weapons including Maltov cocktails.
May 26,
2020
Civil
unrest
2/0 $350M In response to the death of George Floyd, public
outrage developed into the second-most
destructive period of civil unrest in U.S. history,
after the 1992 Los Angeles riots.
December 2,
2020
Cyber
attack
0/0 None
reported
A vendor that provides technology services to
Ramsey County advised the county that its
security had been breached by a hacker seeking
to extort payment through a ransomware
scheme. Information of up to 8,700 clients of
the Family Health Division may have been
compromised.
July 19, 2024 Cyber
outage
0/0 None
reported
A technical problem of global cybersecurity firm
CrowdStrike caused software failures across the
country, including Ramsey County. Of most
significance, hospitals and airports were
impacted, disrupting operations.
3.14.5 PROBABILITY
Human-caused hazards are relatively rare compared to other hazards but have the potential for
significant impacts.
3.14.6 CLIMATE CHANGE IMPACTS
Climate change may influence human-caused hazards in several ways:
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 47
• Incident catalyst: Protests and incidents may be caused be a person or persons concerned
about the future impacts of climate change.
• Resource scarcity: Climate change can exacerbate competition for resources such as water and
food, potentially leading to social unrest and conflicts that could escalate into human-caused
hazards like civil unrest or terrorism.
• Migration and displacement: Rising sea levels, extreme weather events, and other climate-
related factors can force populations to migrate or become displaced. Displaced populations
may face social, economic, and political challenges that contribute to instability and increase the
likelihood of human-caused hazards.
• Infrastructure vulnerability: Climate change can increase the vulnerability of critical
infrastructure to damage from extreme weather events, such as hurricanes, floods, or wildfires.
This damage can disrupt essential services and create conditions that are conducive to human-
caused hazards.
• Changing patterns of disease: Climate change can alter the geographic distribution and
prevalence of diseases, potentially leading to public health crises that strain healthcare systems
and social stability, contributing to human-caused hazards.
While climate change itself is not a direct cause of human-caused hazards, its complex interactions with
socio-economic and environmental factors can create conditions that increase the likelihood or severity
of such hazards.
3.14.7 VULNERABILITY ASSESSMENT
3.14.7.1 People
Children and youth may lack the awareness, experience, or physical capabilities to respond effectively
during emergencies such as active shooter incidents or civil unrest. They are also at increased risk of
physical injury, psychological trauma, disrupted education, and long-term emotional effects due to
exposure to violence or dangerous situations. Elderly individuals and those with disabilities may have
limited mobility, sensory impairments, or chronic health conditions that hinder their ability to evacuate
or seek safety during emergencies. This population also has a higher likelihood of physical harm,
exacerbation of existing health conditions, and increased dependency on caregivers or emergency
services during and after human-caused hazards. Minority and immigrant communities may face an
increased risk of being targeted in hate crimes, limited access to timely and accurate information, and
challenges in accessing support services or legal protection.
3.14.7.2 Property
Critical infrastructure such as power plants, water treatment facilities, transportation hubs (airports,
train stations), and communication networks essential for societal functioning may be targeted as
disruption to these systems can have cascading effects on public safety, health, and economic stability.
Government buildings such as courthouses, legislative centers, and civic centers represent symbols of
authority, governance, and democracy and attacks on these can lead to physical damage, loss of critical
records, disruption of government services, and psychological impact on the community and workforce.
Locations where large numbers of people gather, such as stadiums, concert halls, shopping malls, and
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 48
cultural venues are also vulnerable as a result of those seeking maximum casualties and media
attention.
3.14.7.3 Environment
The environment tends to be less vulnerable to human-caused hazards than natural hazards, but
terrorist activities, particularly those involving sabotage or arson, can target natural resources such as
forests, wildlife reserves, and water bodies. Destruction of these resources can lead to ecological
damage, loss of biodiversity, and long-term environmental degradation. Contamination from chemical
attacks, biological agents, or radioactive materials can also have severe and long-lasting environmental
consequences.
3.14.7.4 County and Community Operations
Attacks on government facilities or critical infrastructure can disrupt essential services such as law
enforcement, emergency response, public utilities, and healthcare systems. This can compromise public
safety and hinder effective response to emergencies. They can also erode public trust in the
government's ability to provide security and protect citizens, leading to increased fear, anxiety, and
uncertainty. In addition, attacks on economic targets or disruptions to business operations can lead to
financial losses, reduced investor confidence, and economic instability within the community. Lastly,
human-caused hazard incidents can create fear, trauma, and social unrest within communities,
impacting mental health, social cohesion, and community resilience.
3.14.8 CONSEQUENCE ASSESSMENT
Impact on the Public
• Risk of injuries and fatalities among civilians caught in the incident. Risk of mass casualties and
widespread injuries.
• Psychological trauma and long-term mental health issues for survivors and witnesses.
• Increased fear and anxiety within the community, potentially leading to changes in daily
behavior and routines.
• Heightened community tensions and divisions, potentially leading to long-term social unrest.
• Personal data breaches, leading to identity theft and financial losses.
• Disruption of access to essential online services, impacting communication, banking, and
healthcare.
• Increased anxiety and mistrust regarding digital security and privacy.
Impact on Responders
• High-risk conditions for law enforcement and emergency medical responders, with potential for
responder injuries and fatalities.
• Psychological impact on responders, including stress and trauma from witnessing or
experiencing violence.
• Strain on resources and personnel, leading to fatigue and reduced effectiveness over time.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 49
• Negative public perception and backlash against responders.
Impact on Continuity of Operations
• Immediate disruption of operations in affected areas, including lockdowns and evacuations.
• Disruption of government operations and essential services, especially if including government
operations, healthcare, banking, and utilities are targeted.
• Long-term impacts on service delivery due to damaged infrastructure and ongoing security
concerns.
Impact on Property, Facilities, and Infrastructure
• Significant risk of property damage, including vandalism, arson, looting, explosions, fires, or
other destructive methods.
• Damage to digital infrastructure, including servers, networks, and databases.
• High repair and replacement costs for damaged infrastructure and facilities and strengthening of
cybersecurity measures.
Impact on the Environment
• Damage from fires, chemical spills, or other destructive actions.
• Long-term impacts from contamination, structural damage, and delayed environmental
remediation.
Impact on the Economy of the Jurisdiction
• Economic losses from business closures, decreased tourism, and reduced consumer confidence.
• Costs associated with increased security measures and mental health support services.
• Long-term impacts on economic growth and stability due to ongoing social tensions and security
concerns.
• Economic losses from disrupted business operations, data breaches, and decreased consumer
confidence in digital services.
Impact on Public Confidence in the Jurisdiction's Governance
• Erosion of public trust if response is perceived as inadequate or slow.
• Increased public dissatisfaction and mistrust in government if response is perceived as heavy-
handed or ineffective.
• Erosion of public trust in digital services and government cybersecurity measures.
• Erosion of confidence in government’s ability to ensure safety and security.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 50
3.15 Infrastructure Failure
3.15.1 PROFILE
Infrastructure failure encompasses a range of events that disrupt the normal functioning of essential
systems and services in the community, and can have widespread and severe consequences for
communities, economies, and the environment. Failures may include:
• Transportation Accidents: These are incidents that disrupt the transportation system, such as
vehicle collisions, train derailments, or aircraft crashes, which can lead to significant delays,
injuries, or fatalities.
• Electrical/Fuel Shortages: These occur when the supply of electricity or fuel is insufficient to
meet demand, often due to infrastructure damage, supply chain issues, or increased
consumption. This can result in power outages and hinder transportation and other critical
services.
• Supply Chain Disruption: This refers to interruptions in the flow of goods and services, which
can be caused by natural disasters, manufacturing problems, or transportation failures. Such
disruptions can lead to shortages of essential items and economic losses.
• Water Contamination: This involves the pollution of water supplies with harmful substances,
which can occur due to infrastructure breakdowns, such as leaks or breaches in containment
systems. Contaminated water poses serious health risks and can affect a wide range of activities,
from drinking water provision to agriculture.
Although not natural hazards, these hazards have been included to address and reduce the risks they
pose to public safety, infrastructure, and essential services.
3.15.2 LOCATION
Infrastructure failures have significant impacts on a given community. Below are the likely locations for
infrastructure failures within Ramsey County:
Transportation
• Roadways – Ramsey County is served by a number of major roadways including Interstates 94 (I-
94), 35E (I35E), and 694 (I-694); US Highways 52 and 61; and MN State Highways 36 (MN-36), 51
(MN-51), and 280 (MN-280). Additionally, there are a number of major county roads that
transverse the region as well.
• Intersections/Interchanges – Major intersections/interchanges in Ramsey County include I-94
and I-35E, I-94 and MN-280, and I-694 and I-35E. Other significant urban and suburban
intersections are located across the county as well.
• Bridges and Overpasses – Ramsey County has a number of key bridges and overpasses including
a number that span the Mississippi River and interstate and highway overpasses.
• Railroads – Ramsey County is a significant hub for rail transportation in the region, with BNSF
Railway, Union Pacific Railroad, Canadian Pacific Railway, and Amtrak providing freight and
passenger services with the county.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 51
• Airports – While the major airport that services Ramsey County, Minneapolis – Saint Paul
International Airport (MSP) is located in adjacent Hennepin County, portions of Ramsey County
will be in the flight path for MSP. In addition, there are two smaller airports located within the
County: Saint Paul Downtown Airport (STP) and Lake Elmo Airport.
Electrical/Fuel Shortages
• Power plants – The county has a number of power generation facilities that provide service to
local and regional energy supply. Two significant stations include Xcel Energy – High Bridge and
District Energy Saint Paul.
• Transmission Lines – The exact location of electrical transmission lines can vary, and are typically
mapped by utility companies, such as Xcel Energy. They are usually strategically located along
major transportation routes, utility corridors, and near industrial zones.
• Substations – In Ramsey County, several substations are operated by utility companies to
manage and distribute electrical power. Some of the key locations include Riverside Substation,
Rice Street Substation, Dale Street Substation, Midway Substation, Downtown Substation, and
Roseville Substation. Exact locations can be identified by the electrical companies.
• Fuel Storage Facilities – Fuel storage facilities are distributed across the region to support
residential, commercial, and industrial fuel needs.
• Distribution Networks – Distribution networks consist of a combination of overhead and
underground power lines, transformers, and substations. These networks are typically managed
by utility companies.
• Pipelines – Ramsey County is intersected by several major pipelines that transport various types
of products, including oil, natural gas, and refined products.
Supply Chain Disruption
• Warehouses and distribution centers – Ramsey County has several significant warehouses and
distribution centers that support a range of industries. They are typically located in close
proximity to major highways, transportation hubs, and industrial zones.
• Transportation Hubs – There are a number of transportation hubs that facilitate the movement
of goods throughout the region including MSP, rail lines, and key interstate interchanges such as
I-94 and I-35E and I-694 and I-35E.
• Manufacturing Plants – Ramsey County is home to a number of notable manufacturers that
support a diverse range of industries including machinery, food production, and consumer
goods. Key industrial areas include Maplewood Industrial Area, Midway Industrial Area, and
Roseville Industrial Area.
Water Contamination
• Water Treatment Plants – the key water treatment facilities in Ramsey are Saint Paul Regional
Water Services, Metro Wastewater Reclamation Point, Saint Paul Water Treatment Plant, all
located within Saint Paul. There are also a number of facilities located across the county,
operated by Ramsey County Regional Water, which service specific communities and townships.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 52
• Industrial Sites – There are a number of industrial sites within the county that have the potential
to release pollutants into water sources due to chemical runoff, wastewater discharges,
accidental spills/leaks, stormwater runoff, airborne contaminants, and poor waste disposal
practices.
• Landfills – In addition to the Ramsey County Household Hazardous Waste Facility and the
Ramsey/Washington Recycling & Energy Center, a number of landfills and waste management
facilities handle municipal solid waste, construction debris, and other types of waste with the
potential to impact water sources. Some former sites are now currently closed but continue to
be monitored.
3.15.3 EXTENT
The extent of infrastructure failure can vary widely due to several factors including the scale of the
incident, the affected location, and the resilience of the infrastructure.
• Transportation incidents – can cause localized disruptions, safety risks, and economic impacts.
• Electrical/Fuel Shortages – widespread outages can affect homes, businesses, and critical
services, creating economic impacts and public health and safety concerns.
• Supply chain disruptions – can have cascading effects across any number of industries, leading
to shortages of goods, increased prices, and economic instability. Delays in the delivery of raw
materials can affect manufacturing processes and operations.
• Water contamination – can have significant health risks, short- and long-term environmental
impacts, and costly economic impacts.
3.15.4 HISTORY
Ramsey County has experienced various infrastructure failures over the years, significantly impacting
the community, local economy, and the environment.
• Transportation incidents – the most notable transportation accident in Minnesota history was
the I-35W Bridge Collapse in 2007. While the event occurred in Minneapolis, it significantly
impacted the broader Twin Cities area, including Ramsey County.
• Electrical/Fuel Shortages – Severe winter storms have caused widespread power outages over
the year, impacting homes, business, and critical infrastructure.
• Supply chain disruptions – COVID-19 caused global and local supply chain disruptions, including
in Ramsey County. Additionally, significant floods in the 1960, and most recently 2024, disrupted
transportation routes and logistics.
• Water contamination – In 2017, elevated levels of lead were detected in drinking water in
sections of Saint Paul, prompting a response to improve water safety measures.
3.15.5 PROBABILITY
The overall probability of infrastructure failures in Ramsey County is likely moderate, with some high risk
during extreme weather events. The most likely causes of such failures include severe winter weather,
flooding, and other weather-related events. Aging transportation infrastructure, such as road and
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 53
bridges, and human caused impacts to communication systems and power grids can also increase the
probability of failure.
3.15.6 CLIMATE CHANGE IMPACTS
Climate change may have profound impacts on infrastructure, leading to failures in the identified
systems. Extreme weather events, specifically temperature extremes, are most likely to impact Ramsey
County.
Possible impacts include:
• Transportation - Damaged roads, bridges, and railways from buckling road washouts, landslides,
and structural failures.
• Electrical and Fuel Shortages – Damage to power lines, substations, and power plants, leading to
outages. Extreme temperatures can also lead to increased demand, putting additional strain on
electrical grids.
• Supply Chain Disruption – temperature changes can affect transportation infrastructure,
delaying or restricting the delivery of goods and raw materials, as well as affecting the storage
and preservation of goods. Climate change can also lead to resource scarcity, affecting the
availability of raw materials.
• Water Contamination – Flooding and increased runoff can overwhelm sewage and wastewater
systems, introducing pollutants into water supplies
3.15.7 VULNERABILITY ASSESSMENT
Communities, including Ramsey County, are increasingly vulnerable to various types of infrastructure
failures, which can significantly impact daily life, economic stability, and public health.
3.15.7.1 People
Infrastructure failure can have immediate and long-term health consequences, including injuries and
fatalities, disease outbreaks, and limited access to healthcare and emergency services. The community
can also suffer economic impacts from job losses, increased costs for basic needed, and economic
instability.
3.15.7.2 Property
Residents and businesses can suffer damages from accidents, power surges, and structural failures.
Supply chain disruptions can impact property development and ongoing maintenance.
3.15.7.3 Environment
Transportation incidents and proximity to industrial areas can impact the environment by contaminating
soil and water, harming aquatic life, soil quality, and broader ecosystems from pollutants and toxins.
Increased reliance on non-renewable energy sources can lead to higher emissions and environmental
degradation as well.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 54
3.15.7.4 County and Community Operations
Infrastructure failures can stress the community’s ability to respond quickly and effectively, disrupting
public services and increasing costs for repairs and recovery. Increased public health responsibilities,
delays in procurement, and long-term environmental remediation and management can also result from
any number of infrastructure failures.
3.15.8 CONSEQUENCE ASSESSMENT
Impact on the Public
• Transportation Failure:
o Restricted mobility and access to essential services (e.g., hospitals, grocery stores).
o Increased risk of accidents and injuries due to unsafe road conditions or lack of public
transportation.
o Potential isolation of communities, especially in rural or remote areas
• Electrical and Fuel Shortages:
o Loss of heating, cooling, and lighting in homes, leading to discomfort or health risks. This
could be particularly consequential for vulnerable populations, particularly those who
rely on power for medical equipment.
o Disruption of communication channels (e.g., internet, phone) that rely on electricity.
o Fuel shortages affecting transportation, emergency services, and daily commuting.
• Supply Chain Disruption:
o Shortages of essential goods, including food, medicine, and other critical supplies.
o Panic buying, leading to further scarcity and possible civil unrest.
o Increased prices due to scarcity, disproportionately affecting low-income households.
• Water Contamination:
o Health risks from consuming or using contaminated water, leading to outbreaks of
waterborne diseases.
o Need for boil water advisories or reliance on bottled water, adding to public stress and
expense.
o Disruption of daily hygiene practices and sanitation, exacerbating public health issues.
Impact on Responders
• Transportation Failure:
o Delayed response times due to blocked or damaged roads and bridges.
o Limited access to affected areas, hampering rescue and relief efforts.
• Electrical and Fuel Shortages:
o Compromised communication systems and reduced operational capacity.
o Difficulty maintaining emergency power in critical facilities, including public safety,
hospitals, and shelters.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 55
o Fuel shortages affecting transportation and emergency services.
• Supply Chain Disruption:
o Shortages of necessary equipment and supplies for responders (e.g., medical supplies,
fuel).
o Increased operational strain due to the need to source and transport scarce resources.
• Water Contamination:
o Increased demand on emergency medical services to address waterborne illnesses.
o Challenges in ensuring safe water supply for responders and affected populations.
Continuity of Operations
• Transportation Failure:
o Inability to maintain essential services and logistics, affecting government operations.
o Delays in implementing recovery and rebuilding efforts.
• Electrical and Fuel Shortages:
o Disruption of critical infrastructure operations, including communication, healthcare,
and public safety systems.
o Reduced capacity to maintain order and provide public services.
• Supply Chain Disruption:
o Delays or failures in delivering essential goods and services, including food, medicine,
and emergency supplies.
o Increased pressure on government resources to manage and mitigate shortages.
• Water Contamination:
o Interruptions in water-dependent services, such as sanitation, healthcare, and
firefighting, and manufacturing.
o Increased need for emergency water distribution and purification efforts.
Impact on Property, Facilities, and Infrastructure
• Transportation Failure:
o Damage to roads, bridges, and public transit systems, requiring costly repairs.
o Potential secondary impacts, such as flooding or erosion, due to compromised
transportation infrastructure.
• Electrical and Fuel Shortages:
o Damage to electrical grids and fuel supply systems, leading to prolonged outages.
o Increased wear and tear on backup systems, requiring additional maintenance and
replacement.
• Supply Chain Disruption:
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 56
o Increased demand on storage and distribution facilities, possibly leading to
infrastructure strain.
• Water Contamination:
o Damage to water treatment plants and distribution systems, requiring extensive repairs.
o Short- and long-term degradation of water quality, affecting property values and
infrastructure resilience.
Impact on the Environment
• Transportation Failure:
o Increased environmental damage from alternative routes or modes of transportation
(e.g., off-road driving, increased air travel).
o Potential for environmental contamination from damaged transport vehicles or
infrastructure.
• Electrical and Fuel Shortages:
o Increased reliance on backup generators, leading to higher emissions and environmental
degradation.
o Potential for fuel spills or leaks, contaminating soil and water sources.
• Supply Chain Disruption:
o Increased waste from spoiled goods and unused inventory, leading to environmental
pollution.
o Potential for illegal dumping or improper disposal of hazardous materials.
• Water Contamination:
o Harm to aquatic ecosystems and wildlife due to polluted water sources.
o Long-term soil and water degradation, affecting agriculture and natural habitats.
Impact on the Economy of the Jurisdiction
• Transportation Failure:
o Economic losses due to costs to repair and replace transportation systems, reduced
productivity, disrupted trade, and increased transportation costs.
o Long-term impacts on tourism, commerce, and investment due to damaged
infrastructure.
• Electrical and Fuel Shortages:
o Increased operational costs for businesses and households due to reliance on
alternative power sources.
o Potential business closures or relocations due to unreliable power and fuel supply.
• Supply Chain Disruption:
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 57
o Loss of revenue for both public and private sectors due to inventory shortages and
delayed deliveries.
o Increased inflation due to scarcity of goods and rising transportation costs.
• Water Contamination:
o Economic impact on agriculture, fisheries, and industries dependent on clean water.
o Increased healthcare costs due to illness and long-term water treatment expenses.
Impact on Public Confidence in the Jurisdiction's Governance
• Transportation Failure:
o Public dissatisfaction with government preparedness and response to infrastructure
failures.
o Perception of government incompetence in maintaining essential services.
• Electrical and Fuel Shortages:
o Loss of public trust in the government's ability to ensure reliable energy and fuel
supplies.
o Increased public pressure on leadership to address energy infrastructure vulnerabilities.
• Supply Chain Disruption:
o Erosion of confidence in government oversight and regulation of supply chains.
o Potential for civil unrest or protest due to perceived government inaction or
mismanagement.
• Water Contamination:
o Significant loss of public trust in the government's ability to protect public health and
safety.
o Heightened scrutiny of water management policies and possible legal or political
repercussions.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 58
4. Hazard Mitigation Strategy
4.1 Plan Goals
The planning process included a review and update of the prior mitigation goals and objectives as a basis
for the planning process and selection of appropriate mitigation actions addressing all hazards of
concern. Of particular importance was addressing hazards disproportionately affecting populations with
increasing risk to climate impacts. Upon consideration, participating jurisdictions opted to change the
goals from the 2019 plan update to better align with county and community mitigation efforts. The 2025
goals are:
Goal 1. Mitigate impacts to life, property, the economy and the environment from natural,
technological, and human-caused hazards.
Goal 2. Build and support local capacity to create resiliency from natural, technological, and human-
caused hazards.
Goal 3. Build resilience for critical infrastructure and systems against impacts of natural, technological
and human-caused hazards.
Goal 4. Increase education, outreach and awareness to the whole community to build resiliency.
Communities were encouraged to use these goals as guideposts when reviewing, updating and adding
new hazard mitigation actions.
4.2 Strategy Development
Using the updated goals as a planning tool to guide mitigation planning efforts, the LPT collaborated to
identify a 2025 hazard mitigation strategy that is both effective and feasible for the county and
participating communities. As part of the process, communities reviewed the mitigation strategy from
the previous plan and reported on the status of specific hazard mitigation actions, and then reviewed
capabilities and risks to identify new hazard mitigation actions as appropriate.
At the beginning of the planning process, the planning team set out participation requirements for
jurisdictions to be considered full participants in the hazard mitigation plan. Among these requirements,
each participating jurisdiction was required to identify at least one new or continuing hazard mitigation
action to reduce risk in their community.
4.3 2019 Mitigation Action Reporting
Communities were asked to review and update the hazard mitigation actions that were identified in the
2019 plan to better understand the progress that they had made, and to identify actions that they
wanted to keep for the 2025 plan update. Communities reviewed each action and identified it in one of
four categories:
• Completed. The action has been completed.
• Not started. The action has not been started but should be included in the updated strategy.
• In progress. The action has been started but should still be included in the updated strategy.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 59
• Cancelled. The action is no longer relevant and should be cancelled.
4.4 Completed Actions
Community reporting on actions from the 2019 plan yielded the following completed actions.
Action Community/Communities Justification
Continue to enforce burning
permits/ restrictions.
Arden Hills, North Oaks, Shoreview,
Falcon Heights, Gem Lake, Little
Canada, Mounds View, New Brighton,
North Saint Paul, Lauderdale
Permits and restrictions are in place;
maintenance action.
Continue to ensure the strong
coordination between local fire
departments to provide fire
protection.
Arden Hills, North Oaks, Shoreview,
Gem Lake, Lauderdale, Little Canada,
Mounds View, New Brighton Coordination is in place; maintenance action.
Continue to provide for public
safety on roads through anti-icing
(application of brine solution
before an event), snow removal,
salting and sanding to minimize
the impacts of snow/ice
accumulations on roadways.
Gem Lake, Little Canada, Mounds
View, Arden Hills, North Oaks,
Shoreview, Vadnais Heights
System to apply this action in place;
maintenance action.
4.5 Cancelled Actions
Community reporting on actions from the 2019 plan yielded the following cancelled and completed
actions.
Action Community/Communities Justification
Identify risks and issues preserving safety and
security to users in parks and associated facilities
shared by school district and city (LGUs). St. Anthony This is a public safety action.
Continue to provide for public safety on roads
through anti-icing (application of brine solution
before an event), snow removal, salting and
sanding to minimize the impacts of snow/ice
accumulations on roadways. Vadnais Heights This is a response action.
Identify risks and issues preserving safety and
security to users in parks and associated facilities
shared by school district and city (LGUs). Vadnais Heights This is a public safety action.
Implement construction or retrofit projects for
safe rooms or storm shelters in identified
vulnerable locations. Vadnais Heights Included in different action.
Promote water conservation measures to
residents during periods of drought and enforce
water conservation ordinances when needed. Vadnais Heights This is a response action.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 60
In addition, some 2019 actions were re-worded or combined with other actions. These actions are
reflected in the strategy in Section 4.8.
Finally, some 2019 actions were removed from the 2025 strategy due to being outside the scope of
hazard mitigation. While not true hazard mitigation actions, they are still considered important by the
communities that listed them. A list of these actions is included in Appendix A.
4.6 2025 Mitigation Strategy Elements
For all new and continuing actions, communities were asked to provide background information on the
action. Each action includes:
• Mitigation action name
• What is the problem the action is solving?
• How does the action solve the problem?
• Action status
• Hazards the action helps mitigate
• Plan goal(s) the action helps implement
• Lead and support agencies for each action
• Potential funding sources to support each action
• Benefits of implementing the action
• Estimated cost of the action
• Estimated timeline for the action
4.7 Action Prioritization
Communities were asked to score each action on a set of metrics. These metrics were:
• Potential for lives saved
• Potential for reduced property damages
• Potential for reduced response actions
• Whether the benefits of the action exceed the costs
• Internal community action priority ranking
Each metric was scored on a scale of 1 – 3, and the total scores were tallied up to identify a final priority
ranking. Final rankings were based on a minimum score of 5 and a maximum score of 15.
• 5 – 8 Low Priority
• 9 – 12 Medium Priority
• 13 – 15 High Priority
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 61
Once scoring was tallied, they were presented to the LPT and communities during the internal plan
review process, along with the invitation to review and edit scores and prioritization as warranted based
on specific community needs. Committee members were invited to review the scoring further during
the committee plan review period and provide any additional comments or concerns on action
prioritization; any comments received were reviewed and incorporated.
4.8 2025 Hazard Mitigation Strategy
Ramsey County’s comprehensive hazard mitigation strategy features a wide range of alternatives that
make real progress toward buying down the County’s and its communities’ risk from the impacts of
hazards.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 62
4.8.1 BASELINE INFORMATION
Table 29. Mitigation Strategy - Baseline Information
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
1
Arden Hills, Falcon Heights,
Gem Lake, Lauderdale, Little
Canada, Maplewood,
Mounds View, New
Brighton, North Oaks, North
Saint Paul, Roseville,
Shoreview, Saint Anthony,
Vadnais Heights, White Bear
Township Ramsey Everbridge
Public Notification
during emergencies
Continue to ensure that all Ramsey
County residents are aware of and sign-
up for the County’s Everbridge
Emergency Notification System. Yes In Progress
2
Arden Hills, Falcon Heights,
Gem Lake, Lauderdale, Little
Canada, Mounds View, New
Brighton, North Oaks, North
Saint Paul, Roseville,
Shoreview, Vadnais Heights,
Saint Anthony
Water Conservation
Measures
Groundwater
conservation
Promote water conservation measures to
residents during periods of drought and
enforce water conservation ordinances
when needed. Yes In Progress
3
Arden Hills, Falcon Heights,
Gem Lake, Lauderdale, Little
Canada, Mounds View, New
Brighton, North Saint Paul,
Roseville, Shoreview,
Vadnais Heights, Saint
Anthony NFIP Participation
Property Damage
Mitigation
Participate in the National Flood
Insurance Program (NFIP) and enforce
local floodplain ordinances to ensure that
new construction is built above
regulatory flood protection elevation. Yes In Progress
4
Arden Hills, Falcon Heights,
Gem Lake, Little Canada,
Mounds View, North Oaks,
North Saint Paul, Roseville,
Shoreview, Saint Anthony,
Vadnais Heights,
Lauderdale, New Brighton Weather Awareness
Public alerts of
potentially hazardous
conditions
Continue to promote the use of NOAA
weather radios by residents, schools,
businesses, and facilities that house
persons with functional and access
needs. Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 63
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
5
Arden Hills, Falcon Heights,
Gem Lake, Mounds View,
New Brighton, North Oaks,
Shoreview, Saint Anthony,
White Bear Township,
Maplewood, North Saint
Paul, Lauderdale
Critical
Infrastructure
Identification Life safety
Identify critical facilities or infrastructure
that do not have generator backup power
in the event of a major power outage
resulting from severe winter or summer
storms. (Examples of critical facilities
include Police/ Fire departments, EOC’s,
health care facilities, water & sewer
treatment facilities, and other facilities
deemed as critical, i.e. public schools and
sheltering facilities). Yes In Progress
6
Arden Hills, Falcon Heights,
Lauderdale, Little Canda,
Mounds View, New
Brighton, North Oaks, North
Saint Paul, Shoreview, Saint
Anthony, White Bear
Township, Gem Lake,
Roseville
Comprehensive Plan
Updates Emergency Planning
Update County/City Comprehensive Plans
and Zoning Ordinances to include
mitigation considerations that help to
reduce risk from natural hazards. Utilize
data of past hazard events and future
climate projections to help inform
updates. Yes In Progress
7
Arden Hills, Falcon Heights,
Little Canada, Mounds
View, New Brighton, North
Oaks, North Saint Paul,
Roseville, Shoreview,
Vadnais Heights, Gem Lake,
Lauderdale, Saint Anthony,
Ramsey County Flood Reduction
Property Damage
Mitigation
Identify, prioritize, and implement
localized flood reduction measures to
improve drainage systems and reduce
over-the-road flooding to County or
municipal roads. Yes In Progress
8
Arden Hills, Falcon Heights,
Little Canada, North Oaks,
Mounds View, Shoreview,
Vadnais Heights, White Bear
Township, Lauderdale, New
Brighton, North Saint Paul,
Roseville, Saint Anthony Storm Shelter Life safety
Implement construction or retrofit
projects for safe rooms or storm shelters
in identified vulnerable locations. Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 64
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
9
Arden Hills, Falcon Heights,
Mounds View, New
Brighton, North Oaks,
Shoreview, Vadnais Heights,
Gem Lake, Lauderdale,
Maplewood, North Saint
Paul, Roseville, Saint
Anthony, White Bear
Township
Community
Vulnerability
Assessment Life safety
Identify community areas, parks, and
facilities (i.e., schools, government
buildings, manufactured home parks)
that are vulnerable to tornadoes and
evaluate for potential construction or
retrofit of safe rooms or storm shelters. Yes In Progress
10
Arden Hills, Falcon Heights,
Mounds View, North Oaks,
Shoreview, Vadnais Heights,
White Bear Township, Gem
Lake, North Saint Paul, Saint
Anthony, Lauderdale Generator Backups
Provide backup power
to critical facilities
Purchase and install generator hook-ups
and encourage local generator purchases
for identified critical facilities that should
have backup power. Yes In Progress
11
Arden Hills, Gem Lake, Little
Canada, Falcon Heights,
Maplewood, Mounds View,
New Brighton, North Oaks,
North Saint Paul, Roseview,
Shoreview, Saint Anthony,
Vadnais Heights, Lauderdale
All Hazards
Education and
Awareness Public Empowerment
Continue to promote education &
awareness on all-hazards and emergency
preparedness for schools, individuals,
families, and businesses. Yes In Progress
12
Arden Hills, Little Canada,
Mounds View, New
Brighton, North Oaks, North
Saint Paul, Shoreview,
Falcon Heights, Gem Lake,
Lauderdale, Maplewood,
Roseville, Saint Anthony,
Ramsey County
Flood Technical
Assistance
Property Damage
Mitigation
Provide information & technical
assistance to property owners to help
mitigate against localized flooding during
high-rain events (i.e., landscaping / green
infrastructure applications). Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 65
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
13
Arden Hills, Little Canada,
Mounds View, North Oaks,
Roseville, Shoreview, Gem
Lake, North Saint Paul,
Lauderdale, Saint Anthony
Flooding Risk
Assessment
Identifying
infrastructure prone
to flooding for future
mitigation projects
Identify residential, commercial,
government facilities, and/or critical
infrastructure properties that may
experience damage from future flooding
and work to implement appropriate
mitigation measures (including buy-out
for property acquisition & structure
demolition or relocation). Areas of focus
may include previously unidentified
flooding locations. Yes In Progress
14
Arden Hills, New Brighton,
North Oaks, North Saint
Paul, Shoreview, Saint
Anthony, Vadnais Heights,
White Bear Township,
Falcon Heights, Gem Lake,
Lauderdale, Little Canada,
Mounds View, Roseville
Overhead
Powerlines
Reduction in power
outages
Work with municipal electrical
cooperative and power companies to
reduce overhead exposure of power lines
that are vulnerable to damage from
severe winter/summer storms (i.e., high
winds, ice, and heavy snow). Replace
overhead power lines with underground
lines in areas with high-risk exposure (i.e.
high tree concentration areas). Yes In Progress
15
Gem Lake, Little Canada,
Mounds View, New
Brighton, Falcon Heights,
Arden Hills, North Oaks,
Shoreview, North Saint
Paul, Saint Anthony,
Vadnais Heights De-Icing Ice buildup
Continue to provide for public safety on
roads through anti-icing (application of
brine solution before an event), snow
removal, salting and sanding to minimize
the impacts of snow/ice accumulations
on roadways. Yes In Progress
16 Maplewood
Outdoor Warning
Siren Coverage
Delayed outdoor
notification to
community members
for severe weather.
Ensures the community has adequate
outdoor warning siren coverage. No Not Started
17
Mounds View, North Saint
Paul, Shoreview, Vadnais
Heights, White Bear
Township
Wellhead Protection
Plan Safe Drinking Water
Ensure that wellhead protection plans are
in place to address flooding that may lead
to contaminated drinking water. Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 66
18 Ramsey County
Outdoor warning
sirens
This mitigation action
addresses Ramsey
County's ability to
warn residents and
visitors who are
outdoors of
impending hazards.
Ramsey County will continue to maintain
the three base Federal Signal siren
systems and three repeater sites for
Ramsey County's outdoor warning siren
system. Ramsey County also encourages
the addition of new outdoor warning
sirens in areas where sound propagation
is limited or does not exist. Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 67
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
19 Ramsey County
County and
municipal planning
programs
This mitigation action
addresses planning
for long-term future
growth in Ramsey
within a community
and ensuring
communities are
using standard, up-to-
date zoning,
floodplain
management,
building, and other
codes
Ramsey County will, every five years,
review and update comprehensive plans
to include mitigation considerations that
help to reduce risk from natural hazards
and utilize data from past hazard events
as well as future climate projections to
help inform updates. Yes In Progress
20 Ramsey County Building retrofits
This mitigation action
addresses the
potential for damages
to public or private
property from severe
spring, summer, and
winter storms due to
poor construction
practices or
construction
materials.
This mitigation strategy aims to promote
annually at fire department open houses,
retrofitting homes, buildings, schools, or
public facilities with building materials
such as wind resistant film for windows
or installing lightning grounding systems,
which will reduce the impacts of
tornados, windstorms, or summer and
winter storm events that can cause
damage to property, personal injury or
loss of life. Yes In Progress
21 Ramsey County
Manufactured home
tie-down straps
This mitigation action
addresses the
potential for damages
to manufactured
homes from severe
spring, summer, and
winter storms.
This mitigation strategy aims to promote
annually at fire department open houses,
retrofitting of manufactured homes with
tie-down straps and skirting to reduce the
impacts of severe spring, summer, and
winter storms or tornadoes. Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 68
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
22 Ramsey County
NOAA weather
radios
This mitigation action
addresses the
problem of limited or
delayed access to
timely warnings for
severe weather and
other hazards,
particularly for
vulnerable
populations such as
those with functional
and access needs.
This mitigation strategy aims to promote
annually at fire department open houses,
the use of NOAA weather radios,
ensuring Ramsey County's residents,
schools, businesses, and facilities receive
immediate alerts, enabling faster
response and protective actions thereby
reducing the risk of injury, loss of life, and
property damage during hazardous
events. Yes In Progress
23 Ramsey County Cyber security
This mitigation action
addresses the
problem of
vulnerabilities in the
cyber security and
physical infrastructure
of Ramsey County's
operations, which can
be exposed to
disruption from
various hazards.
This mitigation strategy aims to
strengthen the cybersecurity measures
and physical infrastructure resilience of
municipal and county operations to
reduce vulnerability to potential hazards,
ensuring continuous service delivery and
protection of critical systems against both
natural, technological, and human-
caused hazards. Yes In Progress
24 Ramsey County Slope stabilization
This mitigation action
addresses the
problem of erosion
and slope failure,
which can threaten
critical infrastructure,
roads, natural
resources, and
recreation areas.
Working with Ramsey County Public
Works, Parks & Recreation, and the Soil &
Water Conservation District, municipal,
and watershed districts over the next
three to five years, Ramsey County EMHS
will identify and prioritize areas where
hillsides, banks or bluffs can be stabilized
thereby reducing impacts to critical
infrastructure, roads, natural resources,
and recreation areas from erosion and
slope failure. Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 69
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
25 Ramsey County
Enrollment in the
NFIP program
This mitigation action
addresses the non-
participation of a
community in Ramsey
County that is
currently not enrolled
in the National Flood
Insurance Program
(NFIP).
Working with the municipal EMA over the
next two to three years, Ramsey County
EMHS will work to enroll this municipality
in the National Flood Insurance Program
(NFIP). Without NFIP participation,
residents are at greater financial risk
during flood events and may face higher
recovery costs of flooding. Yes In Progress
26 Ramsey County
County-wide
Everbridge
enrollment
This mitigation action
addresses Ramsey
County's ability to
notify residents,
including those who
use a language other
than English, or may
have other special
needs such as vision
or hearing
impairment, of
impending or on-
going hazards that
may affect them or
their property.
Ramsey County will conduct outreach
annually to ensure Ramsey County
residents, including those who those who
use a language other than English, or may
have other special needs such as vision or
hearing impairment, are aware of and
can sign up for the County's Everbridge
Emergency Notification System. No New Action
27 Ramsey County
Schools and higher
education
participation
This mitigation action
addresses the
problem of
insufficient disaster
preparedness and
resilience within
educational
institutions, which are
often vulnerable to
disruptions from
natural hazards.
This mitigation strategy aims to
collaborate with local public and private
school districts, as well as institutes of
higher learning, to enhance their disaster
preparedness and resilience through
tailored risk assessments, emergency
response plans, and structural mitigation
measures. By integrating educational
institutions into community-wide hazard
mitigation strategies, the project aims to
safeguard lives, protect critical
infrastructure, and ensure continuity of
education during and after disasters. No New Action
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 70
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
28 Ramsey County
Natural systems
preservation
This mitigation action
addresses the effects
of wind and water
erosion in natural
systems such as lake
shores, stream and
riverbanks, and
wetlands.
This mitigation strategy aims to mitigate
the effects of wind and water erosion by
implementing targeted restoration and
preservation strategies for impacted
natural systems, such as wetlands. This
involves activities such as reestablishing
native vegetation, reinforcing soil
stability, and enhancing hydrological
functions to restore ecological balance. No New Action
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 71
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
29 Ramsey County
Community outreach
and public education
This mitigation action
addresses the
problem of
insufficient
knowledge or
preparedness among
residents, businesses,
schools, and facilities
housing persons with
access and functional
needs.
This mitigation strategy aims to provide
annually at fire department open houses,
education and awareness of the natural,
technological, and human-caused hazards
Ramsey County is exposed to and may
impact the residents, visitors, businesses,
schools, and facilities housing persons
with access and functional needs, and
actions they can take to lessen those
impacts. No New Action
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 72
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
30 Ramsey County
FEMA flood map
updates
This mitigation action
addresses the
problem of outdated
or inaccurate flood
risk information,
which can leave
residents, businesses,
schools, and
governments
unaware of newly
vulnerable structures
or areas.
Working with Ramsey County GIS over
the next two to three years, this
mitigation strategy aims to update flood
maps potentially identifying structures in
the floodplain thereby allowing residents,
businesses, schools, and local and county
governments to identify structures not
previously set in the floodplain and make
decisions about mitigation projects in
new developments. No New Action
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 73
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
31 Ramsey County
Safe rooms or storm
shelter identification
This mitigation action
addresses the
problem of
insufficient protection
for residents and
visitors in Ramsey
County's community
areas, parks, and
facilities that are
vulnerable to
tornados,
windstorms, and
summer weather
hazards.
This mitigation action aims to identify
and prioritize Ramsey County's
community areas, parks, and facilities
that are vulnerable to the impacts of
tornados, windstorms, and summer
weather hazards and evaluate the need
for the construction of a safe room or
storm shelter. Yes Not Started
32 Ramsey County
Underground utility
construction
This mitigation action
addresses the
vulnerability of
overhead utility lines
in high winds or from
ice and snow.
This mitigation strategy aims to
encourage placing power and other
utilities underground to reduce overhead
exposure of power and cable lines that
may be vulnerable to damage from
severe winter/summer storms (i.e., high
winds, ice, and heavy snow). Replace
overhead power lines with underground
lines in areas with high-risk exposure (i.e.
high tree concentration areas). Yes Not Started
33 Ramsey County
Backup generator
needs
This mitigation action
addresses the
problem of power
outages impacting
critical infrastructure,
such as emergency
services, healthcare
facilities, and
communication
systems, which rely
on continuous power
to function
effectively.
This mitigation strategy aims to obtain
generators and install generator hookups
for critical infrastructure that does not
have access to backup power in the event
of power outages. Yes Not Started
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 74
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
34 Ramsey County
Climate-based
construction
This mitigation action
aims to address the
problems of increased
risks to public health,
infrastructure, and
environmental
degradation caused
by extreme heat
events in Ramsey
County.
This mitigation strategy aims to reduce
the effects of extreme heat by
implementing measures that enhance
urban cooling and reduce heat
absorption. Key initiatives include
installing permeable paving to improve
stormwater management and reduce
surface temperatures, creating
greenways and planting trees to provide
natural shade and lower ambient air
temperatures. Additionally, the use of
white or reflective roofs on buildings will
help minimize heat absorption and
reduce energy consumption for cooling. Yes Not Started
35 Ramsey County Water conservation
This mitigation action
addresses potential
water shortages
during periods of
drought.
This mitigation strategy aims, during
times of drought, to promote water
conservation measures to the residents
of Ramsey County through social media
during periods of drought. Yes Not Started
36 Ramsey County
Lightning detection
systems
This mitigation action
addresses the use of
lightning detection
systems in parks,
beaches, and other
open spaces due to
insufficient warning
from lightning strikes
in outdoor
recreational areas,
where users are
particularly
vulnerable.
This mitigation strategy, over the next
two to three years, aims to identify and
prioritize the installation of lightning
detection systems in Ramsey County
beaches, waterparks, picnic areas, and
other open spaces providing an
additional means of warning for lightning
to the residents and visitors of Ramsey
County's parks. Yes Not Started
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 75
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
37 Ramsey County
CIKR exposure
assessments
This mitigation action
addresses Ramsey
County's need to
identify and evaluate
Ramsey County's
critical infrastructure
and key resources to
exposure to risk and
vulnerability, then
identify potential
mitigation efforts.
This mitigation strategy, over the next
two to three years, aims to identify
Ramsey County's facilities that are the
most vulnerable to natural and man-
made hazards, such as flooding, severe
storms, or cyber-attacks, and evaluate
their current protective measures. Based
on this evaluation, the county can
develop targeted mitigation efforts such
as infrastructure upgrades, enhanced
physical security, and redundant systems
to reduce exposure and vulnerabilities. Yes Not Started
38 Ramsey County
Enrollment in the
CRS program
This mitigation action
addresses Ramsey
County and its
municipalities non-
participation in
FEMA's Community
Rating System (CRS)
program.
Working with the municipalities over the
next two to three years, Ramsey County
EMHS will explore participation in FEMA’s
Community Rating System (CRS). The
Community Rating System is essential for
enhancing Ramsey County's resilience by
incentivizing proactive floodplain
management and hazard mitigation
activities. Yes Not Started
39 Saint Paul
Infrastructure
Hardening
This action mitigates
the risk of
infrastructure failures
due to terrorism,
natural disasters, or
other hazards,
ensuring the
continuity of essential
services and
protecting public
safety and the
economy.
Infrastructure Hardening - Conduct study
to identify eligible projects and build
capacity by mitigating key infrastructure
nodes to harden against terrorism and
other hazards Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 76
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
40 Saint Paul
Business Continuity
Planning
Business disruptions
during and after a
hazard by ensuring
that businesses can:
- Maintain operations
during an emergency
- Minimize financial
losses
- Protect critical
assets and resources
- Reduce downtime
- Enhance resilience
Business Continuity Plan Development -
Assist businesses in developing plans and
resources to minimize hazard impacts. Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 77
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
41 Saint Paul
Flood Mitigation -
Chestnut Plaza
Solves problems
related to flooding
risks, maintenance
costs, operational
disruptions, safety
hazards, and long-
term infrastructure
sustainability.
Chestnut Plaza - Feature Fountain Pump
Pit Relocation Yes In Progress
42 Saint Paul Fire Safety Initiative
This initiative
addresses inadequate
fire protection, fire-
related injuries and
deaths, rapid fire
spread, property loss,
inconsistent safety
standards in publicly
funded projects, and
outdated fire codes,
ultimately improving
fire safety and
resilience in
residential buildings.
Enact Combined Enhanced Fire Safety
Ordinances - Automatic Fire Sprinkler
Mitigation Initiatives
a. DSI and Mayor’s Intergovernmental
Relations personnel should continue to
push for the adoption of the most current
International Residential Code without
any redactions of fire sprinkler
requirements
b. OFS, PED, and elected officials should
pass an ordinance and make it standard
practice that any housing renovations or
construction of residential buildings
funded in part or in total by city funding
or tax incentives include the requirement
to
install fire sprinkler systems Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 78
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
43 Saint Paul
Flood Mitigation -
Flood Plain Review
This project addresses
problems related to
flood risk awareness,
preparedness,
emergency response
coordination,
regulatory
compliance, and
decision-making in
the floodplain areas
of Saint Paul, helping
reduce the impacts of
flooding on at-risk
structures
Flood Plain Structure Inventory Project -
Inventory all structures that are at flood
risk within the Mississippi River flood
plain at Saint Paul. Determine individual
Risk Assessments for existing structures.
Includes: inventorying (marrying-up with
Conditional Use Permits), developing Key
Contacts Lists, facilitate accomplishment
of Flood Response Plans and the creation
of maps. Yes In Progress
44 Saint Paul
Flood Mitigation -
Hidden Falls Park
This action solves
problems related to
flooding, erosion,
public safety, high
maintenance costs,
environmental
degradation, and
accessibility issues in
Hidden Falls Park.
Hidden Falls Park - Pathway
Removal/Realignment near low spots
along river Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 79
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
45 Saint Paul Fire Safety Initiative
This initiative solves
problems related to
inadequate fire
protection, high fire
risk in public
buildings, limited
public awareness,
post-fire safety
rebuilding, legislative
barriers, and financial
constraints, ultimately
improving fire safety,
reducing fire-related
damage, and
promoting
community resilience.
Incorporating Fire Sprinkler Technology in
New and Existing Buildings - Automatic
Fire Sprinkler Mitigation Initiatives Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 80
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
46 Saint Paul
Public Outreach &
Education
Emergency
preparedness, public
safety, weather
resilience, terrorism
awareness,
community
emergency planning,
and economic
development by
equipping the public
with information,
tools, and resources
to protect
themselves, their
properties, and their
communities from a
wide range of
hazards.
Promote the use of Family Emergency
Plans, NOAA Weather radios, and Severe
Weather Awareness activities... Winter;
Promote use of home and auto survival
kits and urge public to
heed winter weather warnings...
Summer;
Coordinate with Libraries and Parks & Rec
for cooling sites, and urge public to heed
winter weather warnings… Terrorism;
Educate and disseminate info on "See
Something, Say Something campaign,
common sense terrorism & CBRNE
awareness... EOP and ESF's; Community
Outreach Education, Planning
Discussions...
Economic Development; Educate citizens
on low interest loans for improving
structural ability of
homes & businesses Yes In Progress
47 Saint Paul Fire Safety Initiative
This program
addresses problems
related to lack of
smoke detectors, low
public awareness,
fire-related injuries
and deaths, improper
installation and
maintenance, and fire
safety gaps in
vulnerable
communities,
ultimately enhancing
fire safety and saving
lives.
Smoke Detector Education Program -
Continue to implement smoke detector
education and giveaway program Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 81
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
48 Saint Paul
Flood Mitigation -
Upper Landing
Relocating the pump
pits for the Upper
Landing Feature
Fountains solves
problems related to
flooding,
maintenance costs,
operational
disruptions, safety
hazards, and
extended downtime,
ensuring long-term
functionality and
safety of the
fountains.
Upper Landing Feature Fountains (4) -
Pump Pit Relocation Yes In Progress
49 Saint Paul Flood Mitigation
Reduces flooding,
improves public
safety, minimizes
disruptions, and
lowers maintenance
costs, ensuring long-
term resilience for
Water Street.
Water Street – Due to persistent flooding
events, elevate the street in numerous
low areas. Finalize plans and complete Yes In Progress
50 Saint Paul
Flood Mitigation -
Watergate Marina
This action solves
problems related to
flooding vulnerability,
operational
disruptions, high
maintenance costs,
safety risks, and
environmental
hazards, ensuring the
long-term resilience
and safety of
Watergate Marina's
electrical and fueling
systems.
Watergate Marina - Define and develop
new facility electrical and fueling station
systems to protect against annual
flooding Yes In Progress
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 82
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
51 Saint Paul Flood Mitigation
Improves resilience
against flooding,
prevents sewage
issues, protects
utilities, minimizes
service disruptions,
and enhances public
health and safety.
City House Building - Utility Protection &
Sewage Ejector Relocation Yes Not Started
52 Saint Paul
Flood Mitigation -
Flood Plain Review
The CRS Project
addresses problems
related to inadequate
floodplain
management, high
insurance costs, flood
vulnerability,
community
engagement, and
non-compliance with
best practices,
ultimately enhancing
flood resilience in
Saint Paul and
reducing insurance
premiums for its
residents.
Community Rating System Project – This
voluntary program recognizes and
encourages community floodplain
management activities exceeding the
minimum National Flood Insurance
Program standards. This action tailors
Saint Paul’s own particular hazards,
character, and goals. The city
implementing standards in turn
ultimately leads to discounted premiums
rates. Yes Not Started
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 83
53 Saint Paul
Flood Mitigation -
Crosby Park
Repositioning the
fishing pier during
high water events
addresses problems
related to flooding,
structural damage,
public safety,
accessibility, and
maintenance costs,
ensuring continued
safe use of the pier.
Crosby Bog Walk – Fishing Pier needs to
be repositioned during high water events Yes Not Started
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 84
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
54 Saint Paul
Emergency
Evacuation Planning
This action solves
problems related to
transportation
disruption,
emergency response
delays, economic
impact, public safety,
traffic congestion, and
commuter
accessibility, ensuring
continued movement
and safety after a
critical bridge failure.
Develop alternate transportation plan for
post-failure City-owned river or critical
bridge failure or damage Yes Not Started
55 Saint Paul
Flood Mitigation -
Harriet Island
This action addresses
problems related to
debris entanglement,
high maintenance
costs, dock damage,
operational
disruptions, and
environmental
impacts, ultimately
improving the long-
term functionality and
sustainability of the
Harriet Island Public
Dock
Harriet Island Public Dock - Add more
structural support related to debris
entanglement to reduce repetitive costs
for contract debris and
dredging Yes Not Started
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 85
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
56 Saint Paul
Flood Mitigation -
NOAA Data Update
This project solves
problems related to
outdated flood data,
inaccurate floodplain
boundaries,
ineffective mitigation
planning, regulatory
non-compliance, and
higher insurance
costs, improving flood
risk management and
resilience in Saint
Paul.
Localized NOAA Atlas 14 Map Assessment
Update Project - Utilize current data and
provide updated assessment for Saint
Paul flood plain. Yes Not Started
57 Saint Paul
Flood Mitigation -
Mechanical Gate
The mechanical gate
prevents water entry,
reducing the need for
expensive post-flood
repairs and clean-up
efforts. The
mechanical gate helps
ensure continuous
operations by
preventing water
intrusion.
Mechanical gate used as a levee system
to block water from infrastructure No Not Started
58 Saint Paul Flood Mitigation
Addresses problems
related to erosion,
structural damage,
navigation hazards,
maintenance costs,
public safety, and
environmental
protection, ensuring
the long-term
resilience of the
bridge and
surrounding area.
Raspberry Island - Bridge Deflector
Project needed. Develop plan and
complete programming and construction Yes Not Started
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 86
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
59 Saint Paul
Flood Mitigation -
West Levee
This project solves
problems related to
outdated data,
inaccurate flood risk
assessments,
ineffective planning,
regulatory
compliance, and
insurance pricing,
improving overall
flood resilience in
Saint Paul.
West Levee - Determine FEMA re-
certification and PAL status Yes Not Started
60 St. Anthony
Water Supply
Protection
The City's main water
supply is not
sufficiently protected
from contamination.
Protect the City’s municipal water supply
from contamination Yes In Progress
61 St. Anthony
Severe Weather
Protocols
Lack of safe policies
and procedures
during severe
weather
Develop safe policies, procedures and
facilities to reduce injuries and losses
resulting from severe weather Yes Not Started
62 St. Anthony
Fire Flow Capacity
Expansion
Lack of sufficient flow
capacity of water
mains
Increase fire flow capacity of water main,
provide sufficient water to the public Yes Not Started
63 St. Anthony
Surface Stormwater
Mitigation
Stormwater overflows
existing capacity to
carry surface water.
Increase the amount of storm water
removed from surface grade during rain
events Yes Not Started
64 St. Anthony
Safe Space
Development
A lack of safe spaces
against hazards for
local populations.
Locate and create facilities capable of
providing protection against likely
hazards Identify and construct optimal
safe structures to protect against
probable hazards Yes Not Started
65 St. Anthony
Control System
Hardening
A lack of
prevention/protection
measures against
vulnerabilities of
municipal weather
systems.
Prevent failure of control systems for
water treatment facilities and municipal
wells 3, 4, & 5 Yes Not Started
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 87
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
66 St. Anthony
Sanitary Sewer
Inflow/Infiltration
Mitigation
Inflow and infiltration
into sanitary sewers,
leading to sewer
system backups
Prevent inflow and infiltration into
sanitary sewer, prevent sanitary sewer
system backups Yes Not Started
67 All
Urban Green Space
Initiative
Addresses the
problem of urban
heat islands, where
densely developed
areas experience
higher temperatures
due to minimal
vegetation and heat-
retaining surfaces.
Identify priority urban areas with high
heat island effects to develop green
spaces, such as parks, green roofs, and
shaded corridors. This project will involve
planting native trees, installing
permeable surfaces, and creating shaded
recreational areas. By increasing
vegetation cover, this action will help
lower temperatures, improve air quality,
and reduce energy demands for cooling.
Additionally, green spaces can enhance
stormwater management, reducing the
risk of flooding during heavy rainfall by
allowing for natural absorption. No New Action
68 All
Business Resilience
Preparedness
Initiative
Many small and
medium-sized
businesses in Ramsey
County lack adequate
preparedness for
natural, technological,
or human-caused
hazards, leaving them
vulnerable to
disruptions that could
jeopardize their long-
term viability and
impact the county’s
economic stability.
This action would equip businesses with
the knowledge, tools, and training
needed to prepare for, respond to, and
recover from various hazards. The
program would use educational materials
from Ready.gov, facilitate business
continuity assessments, guide program
planning, and provide hands-on training
and exercises to build resilience within
the business community. No New Action
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 88
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
69 All
Cultural Competency
Communication
Audit
Hazard education,
outreach, and public
warning efforts in
Ramsey County may
not fully address the
diverse cultural,
linguistic, and
accessibility needs of
its population, leading
to ineffective
communication and
reduced preparedness
for certain
communities.
This action will assess current internal
communication methods to identify gaps
in cultural competency, especially
regarding hazard information
dissemination. By identifying barriers and
recommending inclusive communication
practices, the audit will help ensure that
hazard messages reach and resonate with
all community members. No New Action
70 All
Senior Hazard
Awareness and
Preparedness
Outreach
Seniors in Ramsey
County may be more
vulnerable to the
impacts of natural,
technological, and
human-caused
hazards due to
physical limitations,
limited access to
emergency
information, and
specific medical or
mobility needs.
Limited awareness or
preparedness could
heighten their risk in
disaster situations.
This action would deliver targeted
education and outreach to the senior
population, focusing on hazard
awareness, preparedness actions, and
mitigation strategies. This initiative
includes informational sessions,
accessible resources, and guidance on
personal preparedness actions, such as
emergency supply kits, evacuation plans,
and home adaptations to mitigate hazard
risks. No New Action
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 89
Action
Number Jurisdiction
Mitigation Action
Name
What is the problem
the action is solving? How does the action solve the problem?
Is this a
continuing
action from
2019 plan? Action Status
71 All
Enhanced Flood Risk
Mapping and
Vulnerable
Population
Assessment (EFRM-
VPA)
Current FEMA flood
maps may not
accurately reflect
actual floodplain
boundaries in Ramsey
County, potentially
leaving residents and
businesses
unprepared for
flooding events.
Additionally,
vulnerable
populations who are
more likely to be
impacted by flooding
are not identified,
which limits the
county’s ability to
provide targeted
support and resources
during flood events.
This action will update FEMA flood maps
to reflect current floodplain boundaries
and assess structures at risk of flooding.
Simultaneously, the project will map the
locations of vulnerable populations
within the flood-prone areas, such as
low-income, elderly, and disabled
residents, allowing the county to
prioritize resources and develop targeted
outreach and evacuation plans. No New Action
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 90
4.8.2 IMPLEMENTATION INFORMATION
Table 30. Mitigation Strategy – Implementation Information
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
1 All Hazards Goal #4
Ramsey County Emergency
Management & Homeland
Security (RCEMHS) & Municipal
Emergency Management
Agencies (EMAs)
County, municipal
funding
2 Drought Goal #1
RCEMHS, RC Conservation District
& Local City planning depts.
County, municipal
funding
3 Flooding Goal #1 Goal #4
RCEMHS, Municipal EMAs local
city planning depts.
County, municipal
funding
4
Summer
Weather
Hazards
Winter Weather
Hazards Goal #1 RCEMHS & Municipal EMAs
County, municipal
funding
5
Summer
Weather
Hazards
Winter Weather
Hazards Goal #3
RCEMHS, RC Property
Management & Municipal EMAs
County, municipal
funding
6 All Hazards Goal #1
RCEMHS in coordination with
Ramsey County Community and
Economic Development and local
municipal administrators,
Planning & Zoning Committees County funding
7 Flooding Goal #1
RC Public Works, City Public
Works, MnDOT, Watershed
Districts,
County/City Budgets,
MnDOT,
Possible MN DNR Flood
Hazard Grants or FEMA
HMA grant for Localized
Flood Reduction Projects
/ Infrastructure Retrofit
8
Summer
Weather
Hazards Goal #3
RCEMHS, RC Parks & Rec,
Municipal parks & rec, and EMAs
County, municipal
funding, Possible FEMA
HMA grant for Safe
Rooms
9
Summer
Weather
Hazards Goal #1
RCEMHS, RC Parks & Rec,
Municipal parks & rec, and EMAs
County, municipal
funding
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 91
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
10
Summer
Weather
Hazards
Winter Weather
Hazards Goal #3
RCEMHS, RC Property
Management & Municipal EMAs
County, municipal
funding, Possible FEMA
HMA grant for
Generators
11 All Hazards Goal #2 RCEMHS & Municipal EMAs
County, municipal
funding
12 Flooding Goal #1 Goal #4
RC Public Works, RC Conservation
District, and municipal
planning/public works
County/City Funding,
Possible FEMA HMA
grant for Property
Acquisition & Structure
Demolition or Relocation
13 Flooding Goal #1
RCEMHS, RC Public Works, RC
Property Management, RC
Conservation District, municipal
EMA
County, municipal
funding, DNR Flood
Mitigation Grant, US
Army Corps of Engineers
(USACE), Possible FEMA
HMA grant for Property
Acquisition & Structure
Demolition or Relocation
14
Summer
Weather
Hazards
Winter Weather
Hazards Goal #1
RC Public Works, Municipal Public
Works in cooperation the
appropriate utility company.
Coop / Electric Company
funding, Possible FEMA
HMA grant for
Infrastructure Retrofit
15
Winter Weather
Hazards
RC Public Works & Municipal
Public Works
County, municipal
funding
16
Tornado and
Windstorm
Summer Weather
Hazards Goal #1 N/A Municipal EMAs RCEMHS
County, municipal
funding
17 Flooding None Goal #1 none
RC Public Works, MN Dept. of
Health and local city public works
depts.
RC Public Works, MN
Dept. of Health and local
city public works depts.
MDH Source Water
Protection grant funding
for wellhead
improvement projects
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 92
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
18 All Hazards Goal 1 Goal 2 Ramsey County EMHS
Ramsey County
Emergency
Communications Center
(ECC), municipal EMAs County funding
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 93
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
19 All Hazards Goal 1 Goal 3
Ramsey County Community and
Economic Development County funding
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 94
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
20
Tornado and
Windstorm
Summer Weather
Hazards,
Winter Weather
Hazards Goal 1 Goal 2 Ramsey County EMHS
Ramsey County Property
Management, Parks &
Rec, Saint Paul/Ramsey
County
Public Health, municipal
EMAs, school districts County funding
21
Tornado and
Windstorm
Summer Weather
Hazards,
Winter Weather
Hazards Goal 1 Goal 2 Ramsey County EMHS
Municipal EMAs,
manufactured
home park owners
County funding,
municipal funding, MHP
owner funding
22 All Hazards Goal 1 Goal 4 Ramsey County EMHS Ramsey County CPR County funding
23 All Hazards Goal 3
Goal 1,
Goal 2 Ramsey County EMHS Ramsey County IS County funding
24
Geological
Hazards Goal 1 Ramsey County EMHS
Ramsey County Public
Works, Parks &
Recreation, Soil & Water
Conservation District,
municipal EMAs, local
watersheds
County funding,
municipal funding,
SWCD State Cost-Share
Program, FEMA HMA
grants, USDA grants,
watershed funding
25 Flooding Goal 4
Goal 2,
Goal 3 Ramsey County EMHS Municipal EMA
County funding,
municipal funding
26 All Hazards Goal 4
Goal 1,
Goal 2 Ramsey County EMHS
Saint Paul-Ramsey County
Public Health (SPRCPH) in
partnership with Twin
Cities Public Television
(TPT), Ramsey County
Emergency
Communications Center
(ECC); Ramsey County
Communications & Public
Relations (CPR)
County, Twin Cities
Public Television (TPT)
27 All Hazards Goal 1
Goal 2,
Goal 3 Ramsey County EMHS County funding
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 95
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
28 Flooding Geologic hazards Goal 1
Ramsey County Soil & Water
Conservation Local watersheds
Ramsey County Soil &
Water Conservation
funding, other
watershed funding,
private funding
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 96
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
29
Summer
Weather
Hazards
Drought
Flooding
Geologic hazards
Tornado and
windstorms
Winter weather
hazards Goal 4
Goal 1,
Goal 2 Ramsey County EMHS
Saint Paul/Ramsey County
Public Health, municipal
EMAs, school districts County funding
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 97
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
30 Flooding Goal 1 Goal 3 Ramsey County EMHS Ramsey County GIS County funding
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 98
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
31
Tornado and
Windstorm
Summer Weather
Hazards Goal 1 Ramsey County EMHS
Ramsey County Parks &
Rec,
Ramsey County Property
Management County funding
32
Summer
Weather
Hazards
Winter weather
hazards;
Tornados Goal 3 Goal 2 Ramsey County EMHS
Ramsey County Public
Works, Municipal Public
Works, utility companies
Utility company funding,
FEMA HMA grants
33
Summer
Weather
Hazards
Winter weather
hazards;
Tornados Goal 3 Goal 2 Ramsey County EMHS
Ramsey County Property
Management County funding
34
Summer
Weather
Hazards Goal 1
Goal 2,
Goal 3 Ramsey County EMHS
Ramsey County Public
Works,
Ramsey County Property
Management County funding
35 Drought Goal 4 Ramsey County EMHS
Ramsey County Soil &
Water,
local watersheds
County funding,
watershed funding
36
Summer
Weather
Hazards Goal 1 Ramsey County EMHS
Ramsey County Parks &
Rec County funding
37 All Hazards Goal 3
Goal 1,
Goal 2 Ramsey County EMHS
Ramsey County
departments and
agencies County funding
38 Flooding Goal 4
Goal 2,
Goal 3 Ramsey County EMHS Municipal EMAs
County funding,
municipal funding
39 Flooding Infrastructure Goal 1
Emergency Management, Police,
Public Works & Regional Water Parks
Annual Operating
Budgets and Law
Enforcement Training
and Terrorism
Prevention (LETPP)
grants
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 99
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
40 All Hazards
Emergency Management, Police,
MNDoT & Public Works PED
Annual Operating
Budget; public- private
partnerships; grants
41 Flooding P&R PW
Annual Operating
Budget; grant funding
(FMA)
42 All Hazards Fire Safety FD, DSI
Grant funding, Annual
Operating Budget
43 Flooding DSI EM, Parks, PW
Annual Operating
Budget, Federal USACE
funding, grant funding
(FMA)
44 Flooding P&R
Annual Operating
Budget; grant funding
(HMA)
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 100
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
45 All Hazards Fire Safety FD, DSI MN VOADs
Grant funding, Annual
Operating Budget
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 101
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
46 All Hazards
EM & topic
related
departments
and
organizations Department PIOs
Annual Operating
Budget
47 All Hazards Fire Safety FD DSI, Red Cross
Grant funding,
partnership with Red
Cross
48 Flooding P&R
Annual Operating
Budget; grant funding
(FMA)
49 Flooding PW
Annual Operating
Budget; transportation
funding
50 Flooding P&R PW
Annual Operating
Budget; grant funding
(FMA)
51 Flooding P&R PW
Annual Operating
Budget; grant funding
(FMA)
52 Flooding DSI EM
Annual Operating
Budget, Federal grant
funding
53 Flooding P&R PW
Annual Operating
Budget; grant funding
54
Infrastructure
Failure PW
Annual Operating
Budget, various grant
programs,
55 Flooding P&R
Annual Operating
Budget; transportation
funding
56 Flooding DSI EM
Annual Operating
Budget, Federal grant
funding
57 Flooding Infrastructure PW Grant funding
58 Flooding P&R and PW
Annual Operating
Budget, grant funding,
transportation funding
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 102
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
59 Flooding DSI PW
Annual Operating
Budget, Federal USACE
funding, grant funding
(FMA)
60 Flooding Goal 3 Saint Anthony Public Works Utility fees
61
Summer
Weather
Hazards
Winter weather
hazards,
tornadoes and
high winds Goal 2 Saint Anthony Fire Department
County/municipal
funding
62 Flooding Goal 2 Saint Anthony Public Works
County/municipal
funding
63 Flooding Goal 3 Saint Anthony Public Works
County/municipal
funding
64 All Hazards Goal 2
Saint Anthony Fire Department;
School District Grants
65 All Hazards Goal 3 Saint Anthony Public Works Utility fees
66 Flooding Goal 3 Saint Anthony Public Works
County/municipal
funding
67
Summer
Weather
Hazards
Flooding Goal 1 Goal 2 Ramsey County Parks &
Recreation Department
Public Works Department,
Environmental Health
Department, Community
& Economic Development
Department, and the
Public Health Department
Ramsey County's Site
Assessment Grants
(SAG), Minnesota
Department of
Employment and
Economic Development
(DEED) Redevelopment
Grant, U.S. Department
of Agriculture (USDA)
Forest Service Urban and
Community Forestry
Program, National
Oceanic and
Atmospheric
Administration (NOAA)
Community Heat
Resilience Grants
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 103
Action
Number
Main Hazard
Mitigated
Additional
Hazards
Mitigated Main Goal
Additional
Goals Responsible Agency Support Agencies
Potential Funding
Sources
68
All Hazards N/A Goal 2 Ramsey County Economic
Development Department
EMHSD, Public Health
Department, and local
chambers of commerce
and business associations
FEMA’s Pre-Disaster
Mitigation (PDM)
Program and Building
Resilient Infrastructure
and Communities (BRIC)
Program, DEED Small
Business Assistance
Grants, and local
foundation (e.g.,
McKnight)
69
All Hazards N/A Goal 4 Goal 2 Ramsey County Communications
Department
EMHSD, Public Health
Department, and the
Human Services
Department
FEMA’s Hazard
Mitigation Grant
Program (HMGP),
Minnesota Department
of Public Safety’s
Homeland Security and
Emergency Management
(HSEM) grants, and local
foundations such as
Saint Paul & Minnesota
Foundation
70
All Hazards N/A Goal 4 Goal 2 Ramsey County Public Health
Department
EMHSD, Human Services
Department, and local
senior centers and
nonprofits (e.g., Meals on
Wheels, etc.)
HMGP, BRIC, Minnesota
Board on Aging’s
Community Grants,
AARP Foundation grants
71
Flooding N/A Goal 1 Goal 3 Ramsey County Public Works
Department
EMHSD, Community and
Economic Development
Department, and the
Public Health Department
FEMA’s Flood Mitigation
Assistance (FMA)
Program, BRIC, and the
Minnesota Department
of Natural Resources
(DNR) Flood Hazard
Mitigation Grant
Assistance Program
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 104
4.8.3 RANKING AND PRIORITIZATION
Table 31. Mitigation Strategy - Action Ranking and Prioritization
Action
Number
What is the
estimated cost of
this action?
What is the
estimated
timeline for this
action to be
implemented?
Potential for
Lives Saved
1 - Little
Potential
2 - Some
Potential
3 - Major
Potential
Potential for
Reduced
Property
Damages
1 - Little
Potential
2 - Some
Potential
3 - Major
Potential
Potential for
Reduced
Response
Actions
1 - Little
Potential
2 - Some
Potential
3 - Major
Potential
Number of
Hazards the
Action
Addresses
1 - Addresses
One Hazard
2 - Addresses
More Than
One Hazard
Benefits
Exceed Costs
1 - BCA equal
2 - Minor
Exceedance
3 - Major
Exceedance
Community
Action
Priority
Ranking
1 - Low
Priority
2 - Medium
Priority
3 - High
Priority Total
1 Under $50k Over 5 years 2 2 1 2 3 3 13
2 Under $50k 2-3 years 1 1 1 1 3 1 8
3 Under $50k 2-3 years 1 3 2 1 3 1 11
4 Under $50k Over 5 years 2 1 1 2 3 2 11
5 Under $50k 4-5 years 2 1 2 1 1 1 8
6 Under $50k 4-5 years 1 2 2 2 3 2 12
7 Over $1M Over 5 years 1 2 2 1 1 1 8
8 $501k - $750k Over 5 years 2 1 1 1 1 1 7
9 Under $50k 2-3 years 2 1 1 1 1 1 7
10 $250k-$750k Over 5 years 2 1 2 1 1 1 8
11 Under $50k 4-5 years 2 2 2 2 3 2 13
12 Under $50k Over 5 years 1 2 1 1 3 1 9
13 Over $1M Over 5 years 1 2 2 1 1 1 8
14 Over $1M Over 5 years 1 1 3 1 1 1 8
15
16 Under $50k Under 1 year 3 1 2 1 3 3 13
17 Under $50k Over 5 years 1 2 1 2 1 1 8
18 $51k to $250k Under 1 year 3 1 3 2 3 3 15
19 $51k to $250k 4-5 years 2 2 2 2 2 2 12
20 $51k to $250k Under 1 year 3 3 3 2 3 3 17
21 $51k to $250k 4-5 years 3 3 3 2 3 3 17
22 Under $50k Under 1 year 3 1 3 2 3 3 15
23 $51k to $250k 2-3 years 1 3 3 1 2 2 12
24 Over $1M 4-5 years 2 2 2 1 3 1 11
25 Under $50k 2-3 years 2 3 1 1 3 1 11
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 105
Action
Number
What is the
estimated cost of
this action?
What is the
estimated
timeline for this
action to be
implemented?
Potential for
Lives Saved
1 - Little
Potential
2 - Some
Potential
3 - Major
Potential
Potential for
Reduced
Property
Damages
1 - Little
Potential
2 - Some
Potential
3 - Major
Potential
Potential for
Reduced
Response
Actions
1 - Little
Potential
2 - Some
Potential
3 - Major
Potential
Number of
Hazards the
Action
Addresses
1 - Addresses
One Hazard
2 - Addresses
More Than
One Hazard
Benefits
Exceed Costs
1 - BCA equal
2 - Minor
Exceedance
3 - Major
Exceedance
Community
Action
Priority
Ranking
1 - Low
Priority
2 - Medium
Priority
3 - High
Priority Total
26 Under $50k Under 1 year 3 1 3 2 3 3 15
27 Under $50k 2-3 years 3 3 3 2 3 2 16
28 $251k to $500k 4-5 years 1 2 1 1 1 1 7
29 Under $50k Under 1 year 2 1 1 2 1 1 8
30 $251k to $500k 2-3 years 3 3 3 1 3 1 14
31 Under $50k 2-3 years 3 1 1 2 3 2 12
32 Over $1M 4-5 years 1 3 1 2 3 1 11
33 $51k to $250k 2-3 years 1 2 2 2 3 3 13
34 $751k - $1M 4-5 years 2 1 3 1 2 3 12
35 Under $50k Under 1 year 1 1 1 1 1 1 6
36 $51k to $250k 2-3 years 3 1 3 1 3 3 14
37 $51k to $250k 2-3 years 2 2 1 2 2 1 10
38 Under $50k 2-3 years 2 3 3 1 3 2 14
39 $51k to $250k Over 5 years 3 3 2 2 1 3 14
40 Under $50k 2-3 years 1 2 1 2 1 1 8
41 Under $50k 2-3 years 1 1 1 1 1 1 6
42 Under $50k 2-3 years 3 3 3 2 1 2 14
43 Under $50k Under 1 year 1 1 1 1 1 1 6
44 $51k to $250k 2-3 years 1 2 2 1 1 1 8
45 $251k to $500k 4-5 years 3 3 3 2 1 2 14
46 Under $50k Under 1 year 2 2 1 2 1 2 10
47 Under $50k Under 1 year 3 1 1 2 1 2 10
48 Under $50k 2-3 years 1 1 1 1 1 1 6
49 Over $1M Over 5 years 1 2 3 2 1 2 11
50 $51k to $250k 2-3 years 1 2 2 2 1 1 9
51 $51k to $250k 4-5 years 1 2 2 2 1 1 9
52 Under $50k Under 1 year 1 1 1 1 1 1 6
53 Under $50k 2-3 years 1 2 1 1 1 1 7
54 $51k to $250k Over 5 years 3 1 1 2 1 2 10
55 $51k to $250k 2-3 years 1 2 1 1 1 1 7
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 106
Action
Number
What is the
estimated cost of
this action?
What is the
estimated
timeline for this
action to be
implemented?
Potential for
Lives Saved
1 - Little
Potential
2 - Some
Potential
3 - Major
Potential
Potential for
Reduced
Property
Damages
1 - Little
Potential
2 - Some
Potential
3 - Major
Potential
Potential for
Reduced
Response
Actions
1 - Little
Potential
2 - Some
Potential
3 - Major
Potential
Number of
Hazards the
Action
Addresses
1 - Addresses
One Hazard
2 - Addresses
More Than
One Hazard
Benefits
Exceed Costs
1 - BCA equal
2 - Minor
Exceedance
3 - Major
Exceedance
Community
Action
Priority
Ranking
1 - Low
Priority
2 - Medium
Priority
3 - High
Priority Total
56 Under $50k Under 1 year 1 1 1 1 1 1 6
57 Over $1M 2-3 years 1 3 3 2 3 2 14
58 $251k to $500k 4-5 years 1 2 2 2 1 1 9
59 Under $50k Under 1 year 1 1 1 1 1 1 6
60 $251k to $500k 2-3 years 2 2 2 2 2 1 11
61 $51k to $250k 2-3 years 2 2 2 2 2 2 12
62 $751k - $1M 4-5 years 2 2 2 2 2 2 12
63 $751k - $1M 4-5 years 2 2 2 2 2 2 12
64 $251k to $500k 2-3 years 2 2 2 2 2 2 12
65 $251k to $500k 2-3 years 2 2 2 2 2 1 11
66 $751k - $1M 4-5 years 2 2 2 2 2 2 12
67 $251k to $500k 2-3 years 1 2 2 2 2 2 11
68 $51k to $250k 2-3 years 1 2 2 2 3 2 12
69 Under $50k 2-3 years 3 2 3 2 3 2 15
70 Under $50k Under 1 year 3 2 3 2 3 2 15
71 $51k to $250k 2-3 years 3 2 3 1 3 2 14
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 107
5. Plan Implementation and Maintenance
Maintaining and ensuring the plan is kept up to date are integral components of the hazard mitigation
plan life cycle. A structured process for these updates keeps the HMP current, informs any changes in
risk, and maintains eligibility to applicable funding sources for Ramsey County and its communities. Plan
maintenance will be coordinated by:
• The Ramsey County Emergency Management Coordinator.
• The Ramsey County Hazard Mitigation Plan Coordinator, as assigned.
• The Ramsey County LPT, made up of representatives from each participating jurisdiction in
Ramsey County.
5.1 Plan Implementation
5.1.1 FORMAL ADOPTION
Formally adopting the Ramsey County HMP secures buy-in, raises awareness of the HMP, and formalizes
the HMP’s implementation. Each jurisdiction participating in this plan will adopt it following all
jurisdictional procedures. A copy of the generic resolution and the executed copies are included in the
appendices.
5.1.2 IMPLEMENTATION
Once the plan is adopted, each participating community may begin implementing the hazard mitigation
strategy in Section 4 of this document. The mitigation strategy identifies responsible agencies and
entities, general timelines, prioritization, and potential funding sources to assist in strategy
implementation.
5.1.3 INTEGRATION WITH OTHER COMMUNITY INITIATIVES
During the HMP annual review process, each participating municipality will be asked to document how
they are utilizing and incorporating the Ramsey County HMP in tandem to their day-to-day operations
and planning and regulatory processes. Additionally, each municipality will identify additional policies,
programs, practices, and procedures that could be modified to accommodate hazard mitigation actions.
Jurisdictions will ensure that mitigation efforts will translate into inclusive actions that enhance
culturally competent practices that distribute resources fairly and justly to meet the needs of the whole
community. The capabilities identified in in Section 2.10 offer a good starting point for further
integration of the hazard mitigation plan into other community mechanisms.
5.1.4 CONTINUED PUBLIC INVOLVEMENT
Ramsey County and participating jurisdictions are committed to the continued involvement of the public
in the hazard mitigation process. Public outreach and dissemination of the HMP will include:
• Links to the plan on municipal websites of each jurisdiction with that capability.
• Continued utilization of existing social media outlets to inform the public of natural hazard
events. Educate the public via jurisdictional websites on how these applications can be used in
an emergency.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 108
• Expansion of outreach engagement strategies and use of alternative media platforms to reach
the county’s hard-to-reach, diverse populations.
5.2 Monitoring, Evaluating and Updating the Plan
Ramsey County Emergency Management & Homeland Security (RCEMHS) will manage the maintenance
and update of the plan during its performance period.
5.2.1 MONITORING
Each year, beginning one year after plan development, Ramsey County and local community
representatives will collect and process information from the departments, agencies and organizations
involved in implementing mitigation projects or activities identified in their jurisdictional annexes by
contacting persons responsible for initiating and/or overseeing the mitigation projects. Efforts will be
made to equitably collect data from organizations and agencies serving disproportionately impacted
populations.
In addition to progress on the implementation of mitigation actions, including efforts to obtain outside
funding; and obstacles or impediments to implementation of actions, the information that Planning
Partnership representatives shall be expected to document, as needed and appropriate include:
• Any grant applications filed on behalf of any of the participating jurisdictions.
• Hazard events and losses occurring in their jurisdiction.
• Additional mitigation actions believed to be appropriate and feasible.
• Public and stakeholder input.
• Fostering of new resilience relationships and partnerships.
• Evidence of the leveraging and strengthening of social infrastructure, networks and assets.
5.2.2 EVALUATION
The evaluation of the mitigation plan is an assessment of whether the planning process and actions have
been effective, if the HMP goals are being achieved, and whether changes are needed. The HMP will be
evaluated on an annual basis to determine the effectiveness of the programs, and to reflect changes
that could affect mitigation priorities or available funding.
The status of the HMP will be discussed and documented at an annual plan review meeting of the
Planning Partnership, to be held either in person or via teleconference approximately one year from the
date of local adoption of this update, and successively thereafter. At least two weeks before the annual
plan review meeting, the Ramsey County HMP Coordinator will advise the Planning Partnership of the
meeting date, agenda and expectations of the members.
The Ramsey County HMP Coordinator will be responsible for calling and coordinating the annual plan
review meeting and soliciting input regarding progress toward meeting plan goals and objectives. Plan
evaluation will focus on four key areas:
• Changes in capabilities
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 109
• Changes in hazard threat, vulnerability and consequences
• Progress on achieving plan goals
• Monitoring the implementation of the mitigation strategy, including project closeout
Ramsey County will utilize an Annual Review Tool to assist in this process. This reporting tool allows for
continual tracking of evolving risks to Ramsey County as well as progress toward the mitigation of the
risks and impacts on all members of the community.
The HMP will also be evaluated and revised following any major disasters, to determine if the
recommended actions remain relevant and appropriate.
5.2.3 PLAN UPDATES
Local hazard mitigation plans must be reviewed, revised as appropriate, and resubmitted for approval to
remain eligible for benefits awarded under the DMA 2000. It is the intent of Ramsey County to update
this plan on a five-year cycle from the date of initial plan adoption.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 1
Appendix A – Additional Emergency Management Actions
Through the process of developing specific actions focused on hazard mitigation, a number of
participating jurisdictions identified additional actions that while not directly mitigating hazards, still
provide value to the community in the preparedness, response and recovery phases of emergency
management. These actions are presented in Table 32.
Table 32. Additional Emergency Management Actions
Jurisdiction Mitigation
Action Name What is the problem the action is solving? How does the action solve the
problem?
Saint Paul
Emergency
Evacuation
Planning
This action solves the problem of having no
organized and effective evacuation strategy for
downtown areas during emergencies, ensuring a
well-coordinated response that prioritizes safety,
traffic management, and rapid emergency services
access.
Assist in development
Downtown Evacuation Plan
Saint Paul Infrastructure
Failure Planning
Improves preparedness, public safety, traffic
management, and interagency coordination in
response to bridge infrastructure failures.
Bridge Infrastructure Failure
Plans - Assist in development
of response plans of MnDOT
owned bridges
St. Anthony CIKR Access A need to regulate access to government offices
and properties.
Connect all city facilities to City
Hall along with security system
cameras and access key cards:
develop the ability to provide a
secure environment both from
an entry access and visual
standpoint of all city facilities
from a central location.
Facilities include water
treatment plant, well houses,
city hall, fire station, public
works, park shelters/ warming
houses and storage garage.
Arden Hills,
North Oaks,
Shoreview,
Falcon Heights,
Gem Lake,
Little Canada,
Mounds View,
New Brighton,
North Saint
Paul,
Lauderdale
Fire
coordination
Fire departments oftentimes need to partner and
work together to provide fire service.
Continue to ensure the strong
coordination between local fire
departments to provide fire
protection.
St. Anthony
Command
Facility
Continuity
A lack of continuity planning related to command
facilities.
Develop contingency plans to
ensure secure remote
command center for local
emergency responders in case
of destruction or incapacity of
primary facilities or
infrastructure
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 2
Jurisdiction Mitigation
Action Name What is the problem the action is solving? How does the action solve the
problem?
St. Anthony School Threat
Protocols
Lack of safe policies and procedures during school
threat incidents.
Develop safe policies,
procedures and facilities to
protect students, faculty and
staff in situations with
dangerous intruders have
entered the campus
Saint Paul Disaster
Exercises
Improves preparedness, response, recovery, and
mitigation efforts for flood disasters by simulating
real-world scenarios in disaster exercises.
Disaster Exercise Development
- Develop flood recovery and
mitigation scenarios and
integrate into disaster
exercises
Saint Paul
Extreme
Temperature
Sheltering
This action addresses problems related to
vulnerability to extreme temperatures, lack of
preparedness, health and safety risks,
uncoordinated resource allocation, gaps in shelter
access, and strain on emergency services, ensuring
safer and healthier outcomes during extreme
weather events.
Extreme Temperature Shelters
- Coordinate with the
Department of Parks &
Recreation (P & R) to identify,
procure, supplies and plans for
implementation.
Vadnais
Heights Mass Shelter Providing safe space during evacuation
Identify and prioritize an
acceptable area(s) to house
victims during a natural
wintertime disaster
St. Anthony
Threat
Identification
and Risk
Assessment
(Property)
A lack of understanding regarding the vulnerability
of public spaces.
Identify ongoing concerns and
risks facing facilities and spaces
(schools, parks, etc.) and
identify critical infrastructure
St. Anthony
Threat
Identification
and Risk
Assessment
(People)
A lack of understanding regarding the vulnerability
of people in LGUs.
Identify risks and issues
preserving safety and security
to users in parks and
associated facilities shared by
school district and city (LGUs).
St. Anthony Traffic Control
Signage
Need to provide traffic control during signal failure
(e.g., during power outages)
Provide traffic control upon
signal failure by obtaining 50
temporary, portable stop signs
St. Anthony
Law
Enforcement
Protections
LE staff require protection from hazardous working
conditions.
Working in Hazardous
Environment: Allow our Police
Officers functional capabilities
in a hazardous or potentially
hazardous environment
Arden Hills,
North Oaks,
Shoreview,
Falcon Heights,
Gem Lake,
Little Canada,
Mounds View,
New Brighton,
North Saint
Paul,
Lauderdale
Emergency
Operations and
COOP/COG plan
updates
EOPs and COOP/COG plans are vital to community
readiness for disasters.
Continue to update Emergency
Operation Plans and
COOP/COG plans to ensure
that they adequately detail the
needed steps to respond to all-
hazards and ensure continuity
of key government functions in
the event of a disaster.
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 1
Appendix B – Studies and References
The following references were used to inform development of this plan. Specific references are included
where used in the document text.
Source Use
United States Census Population data and statistics
Centers for Disease Control (CDC) Social Vulnerability Index (SVI) Population data and statistics
Ramsey County GIS Data and mapping
Ramsey County Website County and community data
University of Minnesota Climate Adaptation Partnership Climate data
Minnesota Department of Natural Resources Climate data, specific hazards data
Participating jurisdictions Community capability inputs
2019 Ramsey County Hazard Mitigation Plan Community, hazard and mitigation data
Saint Paul Hazard Mitigation Plan Community, hazard and mitigation data
FEMA Declared disaster data
National Inventory of Dams Dams data
Association of State Dam Safety Officials Dams data
United States Drought Monitor Drought data
FEMA’s National Risk Index Hazard risk data
National Drought Mitigation Center Drought data
Drought Impact Reporter Drought impact data
National Weather Service Weather hazards data
National Flood Insurance Program Flood insurance and program data
National Centers for Environmental Information Hazard history and impact data
National Oceanic and Atmospheric Administration Hazard history and impact data
Hazus Hazard impact data
United States Geological Survey Hazard data
Ramsey County 2040 Comprehensive Land Use Plan Hazard data
Federal Motor Carrier Safety Administration Hazard data
Pipeline and Hazardous Materials Safety Administration Hazard data
Weather.gov Hazard data
Journal of Applied Meteorology and Climatology Hazard data
Encyclopedia Britannica Hazard data
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 1
Appendix C – Sample Adoption
(LOCAL GOVERNMENT, INCLUDING SPECIAL DISTRICTS), (STATE)
RESOLUTION NO.
A RESOLUTION OF (LOCAL GOVERNMENT) ADOPTING THE (TITLE AND DATE OF MITIGATION PLAN).
WHEREAS the (local governing body) recognizes the threat that natural hazards pose to people and
property within (local government); and
WHEREAS the (local government) has prepared a multi-hazard mitigation plan, hereby known as (title
and date of mitigation plan) in accordance with federal laws, including the Robert T. Stafford Disaster
Relief and Emergency Assistance Act, as amended; the National Flood Insurance Act of 1968, as
amended; and the National Dam Safety Program Act, as amended; and
WHEREAS (title and date of mitigation plan) identifies mitigation goals and actions to reduce or
eliminate long-term risk to people and property in (local government) from the impacts of future
hazards and disasters; and
WHEREAS adoption by the (local governing body) demonstrates its commitment to hazard mitigation
and achieving the goals outlined in the (title and date of mitigation plan).
NOW THEREFORE, BE IT RESOLVED BY THE (LOCAL GOVERNMENT), (STATE), THAT:
Section 1. In accordance with (local rule for adopting resolutions), the (local governing body) adopts the
(title and date of mitigation plan). While content related to (local government) may require revisions to
meet the plan approval requirements, changes occurring after adoption will not require (local
government) to re-adopt any further iterations of the plan. Subsequent plan updates following the
approval period for this plan will require separate adoption resolutions.
ADOPTED by a vote of ____ in favor and ____ against, and ____ abstaining, this _____ day of
___________, ______.
By: _________________________________ (print name)
ATTEST: By: _________________________________ (print name)
APPROVED AS TO FORM: By: _________________________________ (print name)
Ramsey County | Multi-Jurisdiction Hazard Mitigation Plan 1
Appendix D – Planning Process Documentation
From:Kyle Karsjen
To:Artig-Swomley, Gretchen - External Contact; ben.zender; Brosnahan, David; Christopherson, Pat - External
Contact; Diaz, Izzy; Hamdorf, Trevor; Hearden, Chris; Butkowski, Heather - External Contact; Jason Mallinger;
Linehan, Jack - External Contact; Mondor, Michael; msather; Peterson, Greg; Judd.Freed@co.ramsey.mn.us;
Sieben, Terry - External Contact; Don Smiley; Mayer, Bryan L; Kymmie Scott; Kerry Evans; Jessica Henry;
melissa.lawrence@gemlakemn.org
Cc:Ryan Schroeder; Jim Bownik
Subject:Ramsey County Hazard Mitigation Plan Update - Planning Meeting #1
Start:Thursday, June 13, 2024 12:00:00 PM
End:Thursday, June 13, 2024 2:00:00 PM
Location:Microsoft Teams Meeting
The first meeting of the Ramsey County Hazard Mitigation Plan update process will be held Thursday, June 13 at 1 PM. The meeting will be held
virtually via Microsoft Teams – the login information is below.
At this meeting, we will discuss:* Hazard mitigation planning and why it is important
* The hazard mitigation plan update process and schedule
* The role of communities in hazard mitigation planning
* Capabilities assessment
* Reporting on 2019 hazard mitigation actions
* Public participation
ALL jurisdictions are encouraged to participate. If you are unable to attend this meeting yourself, please forward it to someone else from yourjurisdiction who can sit in for you.
If you have any questions, please let me know at kyle.karsjen@tidalbasingroup.com <mailto:kyle.karsjen@tidalbasingroup.com> or 515-460-4711, or
contact Bryan Meyer at brian.meyer@co.ramsey.mn.us <mailto:brian.meyer@co.ramsey.mn.us> or 651-266-1017.
Kyle
________________________________________________________________________________Microsoft Teams Need help? <https://aka.ms/JoinTeamsMeeting?omkt=en-US>
Join the meeting now <https://teams.microsoft.com/l/meetup-
join/19%3ameeting_MmI5MGYwNWMtNjQ1Yy00YzRiLTkzMDItODc1M2EzNTVkZjYx%40thread.v2/0?
context=%7b%22Tid%22%3a%22f009051e-b7f6-444f-87ae-3622c748f8ed%22%2c%22Oid%22%3a%223f6eb921-0475-4639-8851-
cc3c6cbfcf59%22%7d>
Meeting ID: 243 061 722 000
Passcode: pvgPYv
________________________________
Dial in by phone
+1 914-294-5479,,929315462# <tel:+19142945479,,929315462> United States, Yonkers
Find a local number <https://dialin.teams.microsoft.com/f9a8d180-71df-478e-aaf7-54711b1b13cb?id=929315462>
Phone conference ID: 929 315 462#
For organizers: Meeting options <https://teams.microsoft.com/meetingOptions/?organizerId=3f6eb921-0475-4639-8851-
cc3c6cbfcf59&tenantId=f009051e-b7f6-444f-87ae-
3622c748f8ed&threadId=19_meeting_MmI5MGYwNWMtNjQ1Yy00YzRiLTkzMDItODc1M2EzNTVkZjYx@thread.v2&messageId=0&language=en-US> | Reset dial-in PIN <https://dialin.teams.microsoft.com/usp/pstnconferencing>
________________________________________________________________________________
1
RAMSEY COUNTY, MN HAZARD MITIGATION PLAN UPDATE
Kickoff Meeting – Thursday, June 13, 2024 – 1 p.m. – 2 p.m. CT
Last Name First Name Representing Contact
Brosnahan David Roseville David.Brosnahan@cityofroseville.com
Christopherson Pat White Bear
Township pat.christopherson@whitebeartownship.org
Diaz Izzy St. Anthony izzy.diaz@savmn.com
Freed Judd Ramsey
County Judd.freed@ramseycountymn.gov
Hearden Chris Vadnais
Heights christopher.hearden@cityvadnaisheights.com
Krause Nick Vadnais
Heights nate.krause@cityvadnaisheights.com
Lawrence Melissa Gem Lake melissa.lawrence@gemlakemn.org
Lovas Mike St. Paul Mike.lovas@ci.stpaul.mn.us
Mayer Bryan Ramsey
County bryan.mayer@CO.RAMSEY.MN.US
Peterson Greg White Bear
Lake gpeterson@whitebearlake.org
Richter Mike Vadnais
Heights mike.richter@cityvadnaisheights.com
Sather Matt
Arden Hills,
North Oaks &
Shoreview
msather@ljfd.org
Schroeder Ryan Maplewood ryan.schroeder@maplewoodmn.gov
Sieben Terry St. Paul terry.sieben@ci.stpaul.mn.us
Smiley Don Little Canada don.smiley@littlecanadafire.org
Zender Ben Mounds View ben.zender@moundsviewmn.org
Karsjen Kyle Tidal Basin kyle.karsjen@tidalbasingroup.com
Evans Kerry Tidal Basin kerry.evans@tidalbasingroup.com
Henry Jessica Tidal Basin jessica.henry@tidalbasingroup.com
Scott Kymmie Tidal Basin kymmie.scott@tidalbasingroup.com
2
Agenda / Discussion
Welcome and Introductions
- Kyle Karsjen, Tidal Basin Project Manager welcomed the group and asked attendees to
sign in via Teams Chat, leaving their name, title, jurisdiction, phone, and email. He
introduced himself and the team. The meeting was recorded.
- Judd Freed and Bryan Mayer from Ramsey County also welcomed the group and
thanked them for their participation, noting that this is the first time the City of St. Paul
was participating in the multijurisdictional plan. Judd hopes this updated plan will not be
just aspirational, but truly actionable. Bryan will be the primary point of contact for the
County.
Meeting Purpose: Update the Ramsy County Hazard Mitigation Plan
Kyle discussed the purpose for the plan update, explaining FEMA’s requirements for Hazard
Mitigation Plans and the five-year life cycle of FEMA approval. The previous plan was approved
by FEMA in 2019. Kyle defined hazard mitigation and explained what a hazard mitigation plan is
and does. A hazard mitigation plan:
- Helps a community assess its level of capability in a disaster.
- Helps a community conduct a data-driven review of their hazards, vulnerabilities, and
risks.
- Helps a community develop a hazard mitigation strategy.
o What can we do? How can a community build off the capabilities in place to
buy down the level of risk and vulnerability identified in the plan?
o A hazard mitigation strategy can include things like building a flood wall,
removing brush off wooded areas to remove some of the risk of forest fire,
building earthquake-resistant structures, and removing structures from the
floodplain, for example.
What is Hazard Mitigation?
Kyle spoke about what is covered in a hazard mitigation program and taking sustained actions
to mitigate against the hazards. Mitigation takes place at the beginning and the end of the
disaster process. It breaks the cycle of damage and repair in hazardous areas.
He spoke about why hazard mitigation is important, including gaining eligibility for hazard
mitigation funding sources. Kyle covered the mission areas of emergency management and
where hazard mitigation fits in, at both the beginning and end of the emergency management
cycle.
What is a Hazard Mitigation Plan?
Hazard Mitigation is a comprehensive process that allows the participating jurisdictions to
answer:
o Who are we?
o What are our current community capabilities?
3
o What are our hazards and risks?
o What can we realistically do to mitigate those risks?
- Hazard Mitigation Plans:
o Guide community hazard mitigation actions
o Are created with the whole community
o Are comprehensive and data driven.
o Ensures eligibility for hazard mitigation funding sources.
Major Focus Areas of the Update
- Reporting on community progress
- Updating community and hazards information where needed
- Additional climate change focus
- Meaningfully include underserved communities in the planning process
- Reviewing and tightening the hazard mitigation strategy
Planning Process Overview
- Phase 1 – Kickoff and Community Reporting
o Kyle outlined the participating jurisdictions, the community benefits from participation,
and the requirements for participation, listed below:
Attend planning meetings and participate in the process.
• This meeting serves as the first of 3 planning meetings.
Identify/update status of community capabilities.
Update status of any previous hazard mitigation actions.
Share public survey and public review drafts.
Develop at least one new or continuing hazard mitigation action.
Review and provide input on the plan and plan elements.
Adopt the plan once approved by FEMA.
o Public Outreach
Public Survey
Traditionally Underrepresented Populations Engagement
Public Review Draft
- Phase 2 – Hazard Identification and Risk Assessment
Tidal Basin will conduct an analysis on the following hazards:
• Animal Infectious Disease
• CBRNE/Terrorism
• Cyber Attack
• Civil Unrest
• Dam/levee failure
• Earthquake
• Extreme temperatures
• Flooding
4
• Hazardous Materials
• Human Infectious Diseases
• Invasive Species
• Slope Failure
• Summer Storm Events
• Supply Chain Disruption
• Tornado and High Wind Events
• Utility Failure
• Wildland Fire
• Winter Storm Events
Each hazard listed will have a hazard analysis and a risk assessment and will be ranked in
order of threat, vulnerability and impact.
- Phase 3 – Develop a Mitigation Strategy
o Following the identification of capabilities and the analysis of hazards, the planning
team and participating jurisdictions will work to identify mitigation actions that will buy
down identified levels of risk. Each participating jurisdiction will be required to have
at least one hazard mitigation action that they support.
- Phase 4 – Plan Review and Approval
o Kyle went over the review processes with the planning committee, public review,
state review, and finally FEMA review.
Immediate Next Steps
- Community Reporting
o Kyle discussed initial community reporting that each jurisdiction must submit.
Jurisdictions will be asked to review and update their community capabilities
assessment, as well as provide information on the status of projects identified in
the 2019 hazard mitigation strategy. Tidal Basin will follow up with a separate
email sent to each of the jurisdictional representatives identified in a community’s
Letter of Intent to Participate. Forms will be sent no later than end of day,
Monday, June 17, and reporting will be due June 28, 2024
- Public Engagement
o The survey will be open to all members of the public. The response period for
this will be June 24 through July 12.
o Once the first draft of the plan update is completed, Tidal Basin will work with
jurisdictions to post a public review draft in multiple public places, complying with
jurisdictional rules on notifying the public and gaining their input.
Future Steps
- Planning Meeting #2 – NLT July 31
- HIRA Update – NLT August 30
- Planning Meeting #3 – August/September
- Draft Mitigation Strategy – NLT September 30
- Plan Finalization and Review – NLT November 30
- Plan Approval and Adoption – NLT December 31
From:Kyle Karsjen
To:Kymmie Scott; Kerry Evans; Jessica Henry; Artig-Swomley, Gretchen - External Contact; ben.zender; Brosnahan,
David; Christopherson, Pat - External Contact; Diaz, Izzy; Hamdorf, Trevor; Hearden, Chris; Butkowski, Heather -
External Contact; Jason Mallinger; Linehan, Jack - External Contact; Mondor, Michael; msather; Peterson, Greg;
Judd.Freed@co.ramsey.mn.us; Sieben, Terry - External Contact; Don Smiley; Mayer, Bryan L;
melissa.lawrence@gemlakemn.org; Ryan Schroeder; Jim Bownik; Mike Lovas
Cc:Jennifer Minwegen; Paul Peltier
Subject:Ramsey County Hazard Mitigation Plan - Meeting #2
Start:Tuesday, July 30, 2024 9:00:00 AM
End:Tuesday, July 30, 2024 11:00:00 AM
Location:Microsoft Teams Meeting
The second meeting of the Ramsey County Hazard Mitigation Plan update process is scheduled for July 30, 2024 at 10 AM CT over Microsoft Teams.
During this meeting, we will review Tidal Basin’s initial findings for the updated risk assessment and discuss feedback and insights that the planning
team can provide to ensure that the risk assessment provides a robust and accurate understanding of risk over the entire planning area. We will also
discuss plan goals and begin the formulation of the updated hazard mitigation strategy.
Community participation is vitally important to the hazard mitigation planning process. Please plan to attend this meeting, or if you cannot attend,
please identify an alternate representative to attend in your place to ensure that your community remains an active part of the process.
If you have any questions, please let me (kyle.karsjen@tidalbasingroup.com <mailto:kyle.karsjen@tidalbasingroup.com> ) or Bryan Mayer(bryan.mayer@co.ramsey.mn.us <mailto:bryan.mayer@co.ramsey.mn.us> ) know.
Thank you, and I look forward to talking hazards and risks with everyone on 7/30.
Kyle
Kyle Karsjen
Senior Preparedness Specialist
Policy, Mitigation and Resilience
M:
515.460.4711
kyle.karsjen@tidalbasingroup.com <mailto:kyle.karsjen@tidalbasingroup.com>
tidalbasingroup.com <https://www.tidalbasingroup.com/>
________________________________________________________________________________
Microsoft Teams Need help? <https://aka.ms/JoinTeamsMeeting?omkt=en-US>
Join the meeting now <https://teams.microsoft.com/l/meetup-
join/19%3ameeting_NThlMjU1MzYtODAzZS00NDg2LWJjNDktOTIxZjRkYWY4N2I0%40thread.v2/0?
context=%7b%22Tid%22%3a%22f009051e-b7f6-444f-87ae-3622c748f8ed%22%2c%22Oid%22%3a%223f6eb921-0475-4639-8851-
cc3c6cbfcf59%22%7d>
Meeting ID: 277 310 207 922
Passcode: S7EvuZ
________________________________
Dial in by phone
+1 914-294-5479,,935026685# <tel:+19142945479,,935026685> United States, Yonkers
Find a local number <https://dialin.teams.microsoft.com/f9a8d180-71df-478e-aaf7-54711b1b13cb?id=935026685>
Phone conference ID: 935 026 685#
For organizers: Meeting options <https://teams.microsoft.com/meetingOptions/?organizerId=3f6eb921-0475-4639-8851-
cc3c6cbfcf59&tenantId=f009051e-b7f6-444f-87ae-3622c748f8ed&threadId=19_meeting_NThlMjU1MzYtODAzZS00NDg2LWJjNDktOTIxZjRkYWY4N2I0@thread.v2&messageId=0&language=en-
US> | Reset dial-in PIN <https://dialin.teams.microsoft.com/usp/pstnconferencing>
________________________________________________________________________________
1
RAMSEY COUNTY, MN HAZARD MITIGATION PLAN UPDATE
Planning Meeting #2 – Tuesday, July 30, 2024 – 10 a.m. – 12 p.m. CT
Last Name First
Name Representing Contact
Brosnahan David Roseville David.Brosnahan@cityofroseville.com
Butkowski Heather Lauderdale heather.butkowski@lauderdalemn.org
Diaz Israel St. Anthony izzy.diaz@savmn.com
Freed Judd Ramsey County Judd.freed@ramseycountymn.gov
Hearden Chris Vadnais Heights christopher.hearden@cityvadnaisheights.com
Krause Nick Vadnais Heights nate.krause@cityvadnaisheights.com
Linder Jim Gem Lake Jim.linder@gemlakemn.org
Linehan Jack Falcon Heights jack.linehan@falconheights.org
Lovas Mike St. Paul Mike.lovas@ci.stpaul.mn.us
Mayer Bryan Ramsey County bryan.mayer@CO.RAMSEY.MN.US
Mallinger Jason North St. Paul Jason.mallinger@northstpaul.org
Minwegan Jen New Brighton jennifer.minwegen@newbrightonmn.gov
Montain Matt Mounds View mmontain@sbmfire.org
Peltier Paul White Bear Township paul.peltier@whitebeartownship.org
Peterson Greg White Bear Lake gpeterson@whitebearlake.org
Richter Mike Vadnais Heights mike.richter@cityvadnaisheights.com
Sather Matt Arden Hills, North Oaks
& Shoreview msather@ljfd.org
Schroeder Ryan Maplewood ryan.schroeder@maplewoodmn.gov
Sieben Terry St. Paul terry.sieben@ci.stpaul.mn.us
Zender Ben Mounds View ben.zender@moundsviewmn.org
Karsjen Kyle Tidal Basin kyle.karsjen@tidalbasingroup.com
Evans Kerry Tidal Basin kerry.evans@tidalbasingroup.com
2
Agenda / Discussion
Welcome and Project Review
- Kyle Karsjen, Tidal Basin Project Manager welcomed the group and asked attendees to
sign in via Teams Chat, leaving their name, title, jurisdiction, phone, and email. He
introduced himself and the team, and the attendees introduced themselves. The meeting
was recorded.
- Kyle reviewed the purpose for the plan update, explaining the importance of mitigation.
He then provided the plan update status; Task 1 – Project Initiation has been completed.
The team is in the process of Task 2 – Capabilities and Hazard Identification which will
be the focus of this meeting (Planning Meeting #2). The next meeting (Planning Meeting
#3) will focus on mitigation strategies. Once the plan is drafted, it will be provided to the
state and then FEMA for review and approval.
- After reviewing the participant requirements, Kyle reminded the attendees that each
jurisdiction will need to return their capability assessment and mitigation action status
worksheets, if they have not already done so.
Hazard Review
Kyle walked the group through a discussion about each of the identified hazards listed below,
including the understanding of the hazard, any updates to the hazard history since 2019, and
any local context to provide in the final plan. The HMP will include both a hazard analysis and
vulnerability assessment for each hazard.
Dam/Levee Failure
There are 5 identified dams in the county.
• Classification: 1 High Hazard, 1, Significant Hazard, and 4 Low Hazard.
• History: There is no history of dam failures/issues.
• Impacts: St. Anthony Falls and Coon Dam could have some impact to the county water
flow if they fail.
• Ongoing Strategies: Battle Creek and Ford dams are required to and have EAPs. St.
Paul has been involved in some planning efforts, but do not believe Battle Creek has
ever conducted an exercise. This dam is the responsibility of the watershed.
Drought
• History: There is some history of drought in the region. Previous droughts have caused
stoppage of passenger vessels and impacts to the port.
• Impacts: In addition, White Bear Lake’s levels can impact recreational and residential
used of the lake. There is an ongoing lawsuit regarding White Bear Lake.
• Ongoing Strategies: Many, if not most, jurisdictions have instituted an even/odd watering
schedule for residential use. Only the Governor can completely restrict water usage.
3
Flood
• History: MN has received 30 federal disaster declarations due to flooding since 1957.
Recent major Ramsey flood occurred in June 2014, July 2011, March 2010, and Sept
2007.
• Impact: Ramsey is likely to be impacted by riverine and urban flooding. Heavy rains in
conjunction with freezing temperatures and snowfall have caused impacts to urban
areas. Areas of St. Paul (Water St. area) has low-lying roads, with both a number of
local businesses and the Metro Water Treatment Plan have repetitive issues due to
flooding and could be good to have a better flood water system considered for this area.
• Ongoing strategies: There has been planning and additional mitigation strategies
conducted for flooding in the county. This has helped mitigate past issues around the
airport, Fort Snelling, and other park areas.
Geological Hazards (Landslide, Slope Failure, Karst Soils)
• History: There is a history of small landslides in the county, including in St. Paul and
Gem Lake in the past few years. The landslide in St. Paul killed 2 children, and injured 2
more in 2013, when a bluff gave way. The landslide in Gem Lake caused a disruption to
the railroad tracks.
• Impact: Even with some sealing, there are still caves within the rock walls of the bluff
which cause confined space issues. Additionally there are a number of old landfill sites
which cause issues for development.
• Ongoing strategies: Standard building permits do require soil analysis in most, if not all,
jurisdictions. St. Paul has conducted some mitigation strategies including building a wall
to protect from falling rocks.
Hazardous Materials (Spills, Pipeline, Trucking, Rail)
• History: There have been a few major events reported in recent history, in addition many
smaller events have occurred which typically have a smaller footprint and don’t require
widespread evacuation.
• Impact: Gem Lake, and other jurisdictions, do not have city water, but utilize private
wells. Chemical spills can impact ground water. There are a number of transportation
routes (both rail and road) that traverse the county, carrying hazardous materials.
Roseville has several fuel tank facilities, with approximately 370 semi trucks coming in
and out on a daily basis.
• Ongoing strategies: There were none identified during this meeting.
Summer Weather Hazards (Heat, Hail, Lightning)
• History: Ramsey County has reported at least $7M in damages due to summer weather
events, primarily hail. Hail damage is covered by insurance and is typically
underreported publicly.
• Impact: Due to ongoing climate change, summers are expected to be higher
temperatures with increased precipitation. Heat is a growing and significant concern.
The population is changing, and recent immigrants are not used to the weather and tend
to live with many people in homes without AC. Providing educational information about
the impacts is also a challenge due to the number of languages spoken in the county.
The unhoused population number is also growing.
4
• Ongoing Strategies: The Twin Cities metro area is starting an experimental program to
analyze wet blub impacts. Traditional cooling centers have not been utilized. Public is
instructed to use public facilities. The county is starting to look at resilience hubs as a
potential mitigation strategy.
Tornado and Windstorm
• History: The largest recorded tornado in the county was in 1965, but given its
geography, the county typically experiences straight line winds annually.
• Impact: Typically there are not long lasting effects from these types of events, but
property damage and power outages are always a concern.
• Ongoing Strategies: 98% of the county is covered by outdoor warning sirens, but the
technology is aging. Utility companies tend to maintain trees along major power lines.
Small shelters, typically brick restrooms, are available in many public parks.
Winter Weather Hazards (Cold, Blizzard, Ice Storm)
• History: Since 1950, Ramsey County has reported 109 significant weather events.
• Impact: There is an almost 100% probability of a severe winter storm in a given year,
and climate change is expected to result in heavier snowfall and more extreme events,
including warmer temperatures. Ongoing concern is not from snowfall, but an ice storm
that causes significant and long duration power outages.
• Ongoing Strategies: Ramsey typically uses a shelter in place strategy during a major
winter event, with some facilities open on highways for trucks and passenger vehicles.
Infrastructure Failure (Transportation, Electricity and Fuel, Supply Chain Disruption,
Water Systems)
• History: There have been some notable failures in recent history, such as the I-35 bridge
collapse in 2007, water contamination in St. Paul in 2017, nationwide supply chain
shortages during COVID, and electrical/fuel shortages due to annual winter storms.
• Impact: Major concerns include aging infrastructure, such as roads and bridges, water
infrastructure, and human caused impacts to communications systems and power grids.
• Ongoing Strategies: These are not traditionally included in hazard mitigation plans as
they are more random, without clearly defined areas, and are hard to build resiliency
against, unlike most natural hazards.
Human Caused Hazards (Terrorism, Active Shooter/Hostile Incidents, Civil Disturbance,
Cyber Attack)
• History: In addition to the incidents presented (cyber-attack in 2020, civil unrest in
response to George Floyd killing in 2020, and protests and civil unrest surrounding the
2008 RNC), there have been at least 3-4 major incidents, including officer involved
shootings, and the aftermath of presidential election results that need to be included.
The county was also recently impacted by a major cyber outage, CrowdStrike.
5
• Impact: Hazards such as cyber attack can impact the county even if they are not located
within the county as the city relies on outside services. Civil disturbances have caused
damage to property and blocked roads and highways.
• Ongoing Strategies: These are not traditionally included in hazard mitigation plans as
they are more random, without clearly defined areas, and are hard to build resiliency
against, unlike most natural hazards.
Mitigation Strategy
The focus of the next meeting, Kyle started the discussion around mitigation strategies including
goals which describe the overall direction of the plan and actions which describe specific
activities of projects designed to achieve the goals.
Goals
Common categories of Mitigation Goals are: public education,
policies/planning/training/communication, reduce risk to life and property, and the protection of
critical/essential facilities. It was decided to make the 2025 HMP goals more specific than were
outlined in the 2019 plan. This will be a discussion item at Meeting #3.
Actions
These will be partly based on the information provided by each jurisdictions’ Mitigation Action
Worksheet for reporting status updates of remaining 2019 actions and the development of any
additional mitigation actions. It was noted that each participating jurisdiction must have at least
one mitigation action in the plan, and that all jurisdictions that participate in the National Flood
Insurance Program (NFIP) must have an additional action that relates to the continued
compliance in the program. Ahead of the next meeting, jurisdictions are encouraged to discuss
potential mitigation actions with other representatives in their jurisdiction.
Planning Meeting #3
The next planning meeting is set for Tuesday, August 27 at 1pm CT. This will be a virtual
meeting focused on mitigation actions, including what actions should be included in the plan
update.
Next Steps
Future Steps
- Collect outstanding Capability Assessments and Mitigation Action Status spreadsheets -
ASAP
- HIRA Update – NLT August 30
- Planning Meeting #3 – August 27 at 1PM CT
- Draft Mitigation Strategy – NLT September 30
- Plan Finalization and Review – NLT November 30
6
- Plan Approval and Adoption – NLT December 31
From:Kyle Karsjen
To:Mayer, Bryan L; Jessica Henry; Kerry Evans; Kymmie Scott; Artig-Swomley, Gretchen - External Contact;
ben.zender; Brosnahan, David; Christopherson, Pat - External Contact; Diaz, Izzy; Hamdorf, Trevor; Hearden,
Chris; Butkowski, Heather - External Contact; Jason Mallinger; Linehan, Jack - External Contact; Mondor, Michael;
msather; Peterson, Greg; Judd.Freed@co.ramsey.mn.us; Sieben, Terry - External Contact; Don Smiley;
melissa.lawrence@gemlakemn.org; Ryan Schroeder; Jim Bownik; Mike Lovas
Cc:Christopher Hearden; Jim Lindner
Subject:Ramsey County Hazard Mitigation Plan - Meeting #3
Start:Tuesday, August 27, 2024 12:00:00 PM
End:Tuesday, August 27, 2024 2:00:00 PM
Location:Microsoft Teams Meeting
The third and final planning meeting for the Ramsey County Hazard Mitigation Plan update will be held Tuesday, August 27th from 1-3 PM via
Microsoft Teams. This meeting will focus on mitigation action planning – we’ve identified community capabilities and identified community risks.
What actions can each community identify to buy down those levels of risk?
We will also use the meeting to button up some final elements of the plan. Please plan to attend this meeting; if you cannot attend, please identify an
alternate representative to attend in your place to ensure your community remains up to speed on the planning process.
If you have any questions, please contact me at kyle.karsjen@tidalbasingroup.com <mailto:kyle.karsjen@tidalbasingroup.com> or Bryan Mayer at
bryan.mayer@co.ramsey.mn.us <mailto:bryan.mayer@co.ramsey.mn.us> .
Thank you,
Kyle
________________________________________________________________________________
Microsoft Teams Need help? <https://aka.ms/JoinTeamsMeeting?omkt=en-US>
Join the meeting now <https://teams.microsoft.com/l/meetup-
join/19%3ameeting_NzExN2Q5MTgtMmM2ZS00NGY3LThmOTgtYWZkZWNhNjE4ODk5%40thread.v2/0?
context=%7b%22Tid%22%3a%22f009051e-b7f6-444f-87ae-3622c748f8ed%22%2c%22Oid%22%3a%223f6eb921-0475-4639-8851-
cc3c6cbfcf59%22%7d>
Meeting ID: 233 606 703 437
Passcode: jpZuYv
________________________________
Dial in by phone
+1 914-294-5479,,103758743# <tel:+19142945479,,103758743> United States, Yonkers
Find a local number <https://dialin.teams.microsoft.com/f9a8d180-71df-478e-aaf7-54711b1b13cb?id=103758743>
Phone conference ID: 103 758 743#
For organizers: Meeting options <https://teams.microsoft.com/meetingOptions/?organizerId=3f6eb921-0475-4639-8851-
cc3c6cbfcf59&tenantId=f009051e-b7f6-444f-87ae-
3622c748f8ed&threadId=19_meeting_NzExN2Q5MTgtMmM2ZS00NGY3LThmOTgtYWZkZWNhNjE4ODk5@thread.v2&messageId=0&language=en-
US> | Reset dial-in PIN <https://dialin.teams.microsoft.com/usp/pstnconferencing>
________________________________________________________________________________
1
RAMSEY COUNTY, MN HAZARD MITIGATION PLAN UPDATE
Planning Meeting #3 – Tuesday, August 27, 2024 – 1 p.m. – 2 p.m. CT
Last Name First
Name Representing Contact
Artig-Swomley Gretchen Gem Lake
Bownik Jim Lauderdale Jim.bownik@lauderdalemn.org
Brosnahan David Roseville David.Brosnahan@cityofroseville.com
Christopherson Patrick White Bear Township pat.christopherson@whitebeartownship.org
Hamdorf Trevor New Brighton Trevor.hamdorf@newbrightonmn.gov
Hearden Chris Vadnais Heights christopher.hearden@cityvadnaisheights.com
Linehan Jack Falcon Heights jack.linehan@falconheights.org
Lovas Mike St. Paul Mike.lovas@ci.stpaul.mn.us
Mayer Bryan Ramsey County bryan.mayer@CO.RAMSEY.MN.US
Mallinger Jason North St. Paul Jason.mallinger@northstpaul.org
Montain Matt Mounds View mmontain@sbmfire.org
Peterson Greg White Bear Lake gpeterson@whitebearlake.org
Sather Matt Arden Hills, North Oaks
& Shoreview msather@ljfd.org
Schroeder Ryan Maplewood ryan.schroeder@maplewoodmn.gov
Sieben Terry St. Paul terry.sieben@ci.stpaul.mn.us
Smiley Don
Karsjen Kyle Tidal Basin kyle.karsjen@tidalbasingroup.com
Evans Kerry Tidal Basin kerry.evans@tidalbasingroup.com
Henry Jessica Tidal Basin Jessica.henry@tidalbasingroup.com
Scott Kymmie Tidal Basin Kymmie.scott@tidalbasingroup.com
Agenda / Discussion
Welcome and Project Review
- Kyle gave a reminder on what hazard mitigation means, and how it relates to the other
2
phases of emergency management (preparedness, response and recovery). According
to FEMA, hazard mitigation is “any sustained action taken to reduce or eliminate long-
term risk to life and property from hazard events.” Hazard mitigation can also be defined
as “any action that breaks the cycle of damage and repair in hazardous areas.” Kyle
encouraged communities to keep these definitions in mind as they began updating their
hazard mitigation strategies.
- Hazard Mitigation is important for a variety of reasons, not the least of which is that it
ensures eligibility for hazard mitigation funding sources.
Risk Assessment Review
- Planning Meeting #2 focused on Ramsey County’s vulnerability to each of the listed
failures. As a reminder, for a more well-rounded view of hazards, the County has
included human-caused and infrastructure failures.
- Kyle reviewed information on the risk assessment, including hazards assessed and the
risk assessment components (threat, vulnerability, and consequence) - The risk assessment will be provided via email following this meeting for review and
comment through Friday, September 13. Kyle encouraged the group to review and
provide feedback, noting that communities know and understand their hazards and risks
better than anyone, and we want to make sure that the information is included in the
updated assessment.
Mitigation Strategy Overview
- Kyle reviewed the next step in the process – developing a hazard mitigation strategy with
mitigation actions from each participating jurisdiction. Based on the risk assessment and
available capabilities, the 2025 updated mitigation strategy will align with the County’s
mitigation goals and objectives.
- This strategy will guide a community’s approach for implementing mitigation activities that are
cost effective, technically feasible, and environmentally sound as well as allowing strategic
investment of limited resources.
- Kyle reminded each jurisdiction that they have a baseline mitigation strategy to work from –
the actions each community identified on the mitigation strategy worksheets, during the
reporting process in the early summer as continuing in the new plan.
- Kyle reviewed the goals for the 2025 hazard mitigation plan update. The goals are:
Goal 1: Mitigate impacts to life, property, the economy, and the environment from
natural, technological, and human-caused hazards.
Goal 2: Build and support local capacity to create resiliency from natural,
technological, and human-caused hazards.
Goal 3: Build resilience for critical infrastructure and systems against the impacts of
natural, technological, and human-caused hazards.
Goal 4: Increase outreach and awareness to the whole community to build resilience.
3
- Communities were encouraged to focus on hazard mitigation actions when developing and
updating their mitigation strategies.
- Kyle reviewed the information needed for each carryover and new mitigation action. He
also reviewed some helpful hints on what counts as mitigation and what doesn’t. Each
action will include the following information to inform development and prioritization:
• Problem statement/background
• Method of implementation
• Hazard(s) to be mitigated
• Responsible party/parties
• Estimated costs and benefits
• Budget range
• Potential funding sources
- Each mitigation action will be scored and ranked in the final plan, based on potential lives
saved, potential for reduced property damages, potential for reduced response actions,
benefits exceeding costs, and community priority.
- Each community has two options when it comes to mitigation planning:
• Option 1: If a community would like some additional support, Tidal Basin invites
you to set up a virtual meeting to further discuss your specific mitigation strategy
and potential ideas for additional actions.
• Option 2: If a community doesn’t need additional support, Tidal Basin will share
materials and instructions to submit new mitigation actions.
- All updated mitigation strategies and information are due no later than Friday,
September 13.
Next Steps
Tidal Basin
- Each community will receive a follow up email NLT end of week regarding information
from this meeting.
- Email will include current hazard mitigation strategy, instructions on setting up
community meetings, instructions to submit new mitigation actions.
Communities
- Decide whether you want a community meeting. Let us know sooner rather than later.
- Review and provide feedback on Draft #1 of Hazard Analysis and Risk Assessment.
- Update carryover mitigation actions and submit any new mitigation actions NLT Friday,
September 13
4
Timeline for Future Activities
- Draft plan compiled – Early October
- Draft plan sent to communities for review – Early October
- Public review draft – Mid October
- State review – Early November
- FEMA review – Mid November
- FEMA approval – December
- Plan adoption – December/January
Action Items
Task Responsibility Date
Provide first draft of hazard analysis and risk
assessment
Tidal Basin August 30, 2024
Distribute meeting materials and materials for
updating community mitigation strategies
Tidal Basin August 30, 2024
Complete community meetings Tidal Basin September 11,
2024
Review and provide comment on first draft of
hazard analysis and risk assessment
Participating
jurisdictions
September 13,
2024
Provide new mitigation actions and updated
mitigation strategies for each community
Participating
jurisdictions
September 13,
2024
RAMSEY COUNTY, MN HAZARD MITIGATION PLAN UPDATE
2025 Plan Update Goals
Goal 1 Mitigate impacts to life, property, the economy and the
environment from natural, technological, and human-
caused hazards.
Goal 2 Build and support local capacity to create resiliency from
natural, technological and human-caused hazards.
Goal 3 Build resilience for critical infrastructure and systems
against the impacts of natural, technological and human-
caused hazards.
Goal 4 Increase outreach and awareness to the whole community
to build resiliency.
Ramsey County, MN Hazard Mitigation Plan Update
Mitigation Action Planning
What does my community need to complete by Friday, September 13? Communities are asked
to utilize the excel spreadsheet attached to this document to refine the actions already included,
and to add new any mitigation actions as appropriate. Answer the questions at the top of each
column for each action added or refined. Please answer every question. Some questions include a
drop-down menu where respondents can select from a pre-identified list of answers. Answers do
not have to be perfect but should give an idea of the parameters of the mitigation actions. The excel
spreadsheet is currently populated with all mitigation actions contained in the 2019 hazard
mitigation plan, along with some Tidal Basin recommendations.
Why Is mitigation action planning important? Throughout the mitigation planning process, each
community has already provided multiple inputs into the process – you’ve reported on the status of
your 2019 hazard mitigation actions, you’ve provided an update on community capabilities, and
you’ve reviewed and provided comment on the hazard analysis and risk assessment. The next step
is mitigation action planning – now that we have a new and better understanding of our risk, what
should we do to mitigate the impacts of the hazards to which we are vulnerable? When
implemented, a good hazard mitigation strategy effectively buys down risk and is “where the rubber
meets the road” in the hazard mitigation plan update.
What tools are available to help my community refine mitigation actions and add additional
actions to our mitigation strategy? There are a few resources communities should utilize when
refining and adding new mitigation actions to their mitigation strategy.
• Plan Goals – the goals were updated from the 2019 plan update. These goals can be used to
generate mitigation actions. A list of the goals can be found here.
• We also discussed some helpful hints for mitigation action development during our third
planning meeting Tuesday, August 27. I encourage you to review that recording if you
weren’t able to attend (found here).
What do I do if my community is totally lost and needs some additional help? If your
community could use some extra help, Tidal Basin is offering to hold 30 – 60 minute virtual
meetings to help walk you through the process and provide some additional insights. Virtual
meetings can be set up by email Kymmie Scott at kymmie.scott@tidalbasingroup.com.
My community provided updates to the projects listed in our strategy from the 2019 plan – why
do I have to do anything else? The actions identified by each community in the 2019 plan serve as
a baseline for the 2025 update, but communities are asked to review the list again, refine their
existing migration actions, and add new ones based on updated hazard and risk information found
in the updated plan.
From:Kyle Karsjen
To:Artig-Swomley, Gretchen - External Contact; ben.zender; Brosnahan, David; Christopherson, Pat - External
Contact; Diaz, Izzy; Hamdorf, Trevor; Hearden, Chris; Butkowski, Heather - External Contact; Jason Mallinger;
Linehan, Jack - External Contact; Mondor, Michael; msather; Peterson, Greg; Judd.Freed@co.ramsey.mn.us;
Sieben, Terry - External Contact; Don Smiley; Mayer, Bryan L; melissa.lawrence@gemlakemn.org; Ryan
Schroeder; Jim Bownik; Mike Lovas
Cc:Kymmie Scott; Kerry Evans; Jessica Henry
Subject:Ramsey County Hazard Mitigation Survey - please share far and wide
Date:Monday, June 24, 2024 1:15:00 PM
Attachments:image002.png
Ramsey County HMP Survey Flyer.jpg
Ramsey County HMP Survey Flyer.pdf
image001.jpg
Good afternoon,
As discussed during our hazard mitigation plan kickoff earlier this month, we are pleased to
announce that the public survey intended to gather information from respondents on their
experiences, knowledge, and concerns about local hazards as a component of the Ramsey
County Hazard Mitigation Plan is live and will remain open through Friday, July 12th. We are
asking each community to share the survey far and wide, using whatever methods you would
traditionally use to share information with your residents. This can include posting the
information on public websites, sharing it through a community’s social media such as
Facebook, or utilizing messaging systems to invite the public to complete the survey. Please
share the survey no later than Wednesday, June 26th. When you share it, please send
screenshots of what you’ve shared to kyle.karsjen@tidalbasingroup.com so that we can
include those records as part of the plan.
Please let me know if your community has any questions on the resources below or need any
additional information. The survey can be found at https://forms.office.com/r/tk5ySqn1Ha. I’vealso attached a flyer in both jpeg and adobe pdf you can use as you see fit to share. See below forsome sample text that you can use to share the survey:
Use or adapt the following when posting or communicating the availability of this survey to the
public:
Ramsey County has begun the process of updating the 2019 Hazard Mitigation Plan (HMP) soall municipalities in Ramsey County remain eligible to receive certain types of federal mitigationfunding to reduce hazard risk. The HMP focuses on understanding the natural risks and hazardsthat threaten the county, identifying community capabilities that can be used to mitigate risks,and laying out a comprehensive hazard mitigation strategy to buy down risks from thosehazards. Public participation and feedback is an important part of the hazard mitigation planningprocess. Ramsey County Emergency Management and Homeland Security has developed abrief survey to assist in providing the public with an opportunity to contribute to the planupdate. The survey focuses on the public’s experiences with hazards, includingrecommendations for hazard reduction. The input provided is vital to completing the planupdate. All information collected from this survey will be anonymous. Please complete the survey by
Friday, July 12th at: https://forms.office.com/r/tk5ySqn1Ha.
Kyle Karsjen
Senior Preparedness Specialist
Policy, Mitigation and Resilience
M:515.460.4711 kyle.karsjen@tidalbasingroup.com
tidalbasingroup.com
MORRIS COUNTY
HAZARD MITIGATION PLAN
2024 UPDATE
Morris County and participating municipalities are preparing
an update of the Countywide Hazard Mitigation Plan. The
goal of this plan is to identify ways that Morris County
communities can reduce damages from future hazards.
As part of the planning process, we are looking for your input
on what natural hazards affect you most and how.
Ramsey County resident, or work in the county?
Take our survey!
https://forms.office.com/r/tk5ySqn1Ha
Or Scan:
For more information about the hazard mitigation process, please contact:
Ramsey County Emergency Management & Homeland Security (RCEMHS)
(651) 266-1020
Visit the RCEMHS Website
WE NEED YOUR INPUT!
RAMSEY COUNTY
HAZARD MITIGATION PLAN UPDATE
Ramsey County and participating municipalities are
preparing an update of the Hazard Mitigation Plan. The goal
of this plan is to identify ways that Ramsey County
communities can reduce damages from future hazards.
As part of the planning process, we seek your input on
which hazards impact you most and in what ways.
From:Kyle Karsjen
Bcc:mmontain@sbmfire.org; Mayer, Bryan L; Jessica Henry; Kerry Evans; Kymmie Scott; Artig-Swomley, Gretchen -
External Contact; ben.zender; Brosnahan, David; Christopherson, Pat - External Contact; Diaz, Izzy; Hamdorf,
Trevor; Hearden, Chris; Butkowski, Heather - External Contact; Jason Mallinger; Linehan, Jack - External
Contact; Mondor, Michael; msather; Peterson, Greg; Judd.Freed@co.ramsey.mn.us; Sieben, Terry - External
Contact; Don Smiley; melissa.lawrence@gemlakemn.org; Ryan Schroeder; Jim Bownik; Mike Lovas
Subject:Ramsey County Hazard Identification and Risk Assessment - Review Draft
Date:Friday, August 30, 2024 2:26:00 PM
Attachments:image001.png
image004.jpg
Good afternoon, and happy long weekend!
The first draft of the Hazard Identification and Risk Assessment (HIRA) for Ramsey County’s
Hazard Mitigation Plan (HMP) update is ready for review and comment. This draft represents
our first stab at reviewing Ramsey County’s hazards and their potential impacts on the
community. The draft also includes an initial hazard prioritization based on three factors –
threat, vulnerability and consequence.
Please note that you have direct control over everything in the HIRA – please provide me any
feedback on where we may have gotten something wrong on hazards, or other edits we can
make. As you read through the document, I would also be appreciative if you share any
additional anecdotal experience you may have with these hazards so that we can add some of
that color to the document.
The draft HIRA can be found here.
Please provide any comments on the document using the comment collection tool,
which can be found here.
Please input all comments into this form no later than Friday, September 13.
If you have any questions or have any issues accessing the document, please let me know.
Also as a reminder, the Tidal Basin planners assigned to your communities should have sent
the worksheet out to each community this week to develop each community’s mitigation
strategy. This information is also due no later than Friday, September 13. Please let us know
if we can provide any assistance as you develop your updated mitigation strategy.
I hope everyone has a great holiday weekend.
Thank you,
Kyle
Kyle Karsjen
Senior Preparedness Specialist
Resilience, Mitigation and Policy
M:515.460.4711 kyle.karsjen@tidalbasingroup.com
tidalbasingroup.com
From:Kyle Karsjen
Bcc:mmontain@sbmfire.org; Mayer, Bryan L; Jessica Henry; Kerry Evans; Kymmie Scott; Artig-Swomley, Gretchen -
External Contact; ben.zender; Brosnahan, David; Christopherson, Pat - External Contact; Diaz, Izzy; Hamdorf,
Trevor; Hearden, Chris; Butkowski, Heather - External Contact; Jason Mallinger; Linehan, Jack - External
Contact; Mondor, Michael; msather; Peterson, Greg; Judd.Freed@co.ramsey.mn.us; Sieben, Terry - External
Contact; Don Smiley; melissa.lawrence@gemlakemn.org; Ryan Schroeder; Jim Bownik; Mike Lovas
Subject:RE: Ramsey County Hazard Identification and Risk Assessment - Review Draft
Date:Friday, September 6, 2024 11:39:00 AM
Attachments:image001.png
image004.jpg
image005.jpg
Good afternoon, and happy Friday! This email serves as a reminder of some deadlines coming
up next Friday, September 13th:
The first draft of the Hazard Identification and Risk Assessment (HIRA) is available for
review and comment. Please scroll down to see the links and information for the HIRA,
or reference the original email sent Friday, August 30.
Updated community hazard mitigation strategy information is also due next Friday. Each
community received a specific email tailored to their community, sent Wednesday,
August 28. As a reminder, Tidal Basin staff are available to provide support to each
community in developing mitigation strategies if needed.
Thank you and have a great weekend.
Kyle
Kyle Karsjen
Senior Preparedness Specialist
Resilience, Mitigation and Policy
M:515.460.4711 kyle.karsjen@tidalbasingroup.com
tidalbasingroup.com
From: Kyle Karsjen
Sent: Friday, August 30, 2024 2:27 PM
Subject: Ramsey County Hazard Identification and Risk Assessment - Review Draft
Good afternoon, and happy long weekend!
The first draft of the Hazard Identification and Risk Assessment (HIRA) for Ramsey County’s
Hazard Mitigation Plan (HMP) update is ready for review and comment. This draft represents
our first stab at reviewing Ramsey County’s hazards and their potential impacts on the
community. The draft also includes an initial hazard prioritization based on three factors –
threat, vulnerability and consequence.
Please note that you have direct control over everything in the HIRA – please provide me any
feedback on where we may have gotten something wrong on hazards, or other edits we can
make. As you read through the document, I would also be appreciative if you share any
additional anecdotal experience you may have with these hazards so that we can add some of
that color to the document.
The draft HIRA can be found here.
Please provide any comments on the document using the comment collection tool,
which can be found here.
Please input all comments into this form no later than Friday, September 13.
If you have any questions or have any issues accessing the document, please let me know.
Also as a reminder, the Tidal Basin planners assigned to your communities should have sent
the worksheet out to each community this week to develop each community’s mitigation
strategy. This information is also due no later than Friday, September 13. Please let us know
if we can provide any assistance as you develop your updated mitigation strategy.
I hope everyone has a great holiday weekend.
Thank you,
Kyle
Kyle Karsjen
Senior Preparedness Specialist
Resilience, Mitigation and Policy
M:515.460.4711 kyle.karsjen@tidalbasingroup.com
tidalbasingroup.com
From:Kyle Karsjen
Bcc:mmontain@sbmfire.org; Mayer, Bryan L; Jessica Henry; Kerry Evans; Kymmie Scott; Artig-Swomley, Gretchen -
External Contact; ben.zender; Brosnahan, David; Christopherson, Pat - External Contact; Diaz, Izzy; Hamdorf,
Trevor; Hearden, Chris; Butkowski, Heather - External Contact; Jason Mallinger; Linehan, Jack - External
Contact; Mondor, Michael; msather; Peterson, Greg; Judd.Freed@co.ramsey.mn.us; Sieben, Terry - External
Contact; Don Smiley; melissa.lawrence@gemlakemn.org; Ryan Schroeder; Jim Bownik; Mike Lovas
Subject:RE: Ramsey County Hazard Identification and Risk Assessment - Review Draft
Date:Thursday, September 12, 2024 8:47:00 AM
Attachments:image001.png
image002.jpg
image003.jpg
Good morning! Thank you to those communities who have already sent in their updated
strategies, and those communities who have met with us this week to further discuss
mitigation action planning. This email serves as a final reminder of some deadlines coming up
tomorrow, September 13th:
The first draft of the Hazard Identification and Risk Assessment (HIRA) is available for
review and comment. Please scroll down to see the links and information for the HIRA,
or reference the original email sent Friday, August 30.
Updated community hazard mitigation strategy information is also due next Friday. Each
community received a specific email tailored to their community, sent Wednesday,
August 28. As a reminder, Tidal Basin staff are available to provide support to each
community in developing mitigation strategies if needed.
Thank you!
Kyle
Kyle Karsjen
Senior Preparedness Specialist
Resilience, Mitigation and Policy
M:515.460.4711 kyle.karsjen@tidalbasingroup.com
tidalbasingroup.com
From: Kyle Karsjen
Sent: Friday, August 30, 2024 2:27 PM
Subject: Ramsey County Hazard Identification and Risk Assessment - Review Draft
Good afternoon, and happy long weekend!
The first draft of the Hazard Identification and Risk Assessment (HIRA) for Ramsey County’s
Hazard Mitigation Plan (HMP) update is ready for review and comment. This draft represents
our first stab at reviewing Ramsey County’s hazards and their potential impacts on the
community. The draft also includes an initial hazard prioritization based on three factors –
threat, vulnerability and consequence.
Please note that you have direct control over everything in the HIRA – please provide me any
feedback on where we may have gotten something wrong on hazards, or other edits we can
make. As you read through the document, I would also be appreciative if you share any
additional anecdotal experience you may have with these hazards so that we can add some of
that color to the document.
The draft HIRA can be found here.
Please provide any comments on the document using the comment collection tool,
which can be found here.
Please input all comments into this form no later than Friday, September 13.
If you have any questions or have any issues accessing the document, please let me know.
Also as a reminder, the Tidal Basin planners assigned to your communities should have sent
the worksheet out to each community this week to develop each community’s mitigation
strategy. This information is also due no later than Friday, September 13. Please let us know
if we can provide any assistance as you develop your updated mitigation strategy.
I hope everyone has a great holiday weekend.
Thank you,
Kyle
Kyle Karsjen
Senior Preparedness Specialist
Resilience, Mitigation and Policy
M:515.460.4711 kyle.karsjen@tidalbasingroup.com
tidalbasingroup.com
From:Kyle Karsjen
Bcc:Mayer, Bryan L; Jessica Henry; Kerry Evans; Kymmie Scott; Artig-Swomley, Gretchen - External Contact;
ben.zender; Brosnahan, David; Christopherson, Pat - External Contact; Diaz, Izzy; Hamdorf, Trevor; Hearden,
Chris; Butkowski, Heather - External Contact; Jason Mallinger; Linehan, Jack - External Contact; Mondor,
Michael; msather; Peterson, Greg; Judd.Freed@co.ramsey.mn.us; Sieben, Terry - External Contact; Don Smiley;
melissa.lawrence@gemlakemn.org; Ryan Schroeder; Jim Bownik; Mike Lovas; Christopher Hearden; Jim Lindner
Subject:Ramsey County DRAFT Hazard Mitigation Plan for Review - Due Wednesday, October 30
Date:Wednesday, October 16, 2024 12:13:00 PM
Attachments:image001.png
image004.jpg
Good morning!
As you know, Ramsey County and its communities have been participating in an update of the
county’s hazard mitigation plan. Thank you to everyone who has participated – attending meetings,
providing information, updating your hazard mitigation strategies and other actions that have
contributed to plan development. We are pleased to share the first full draft of the updated hazard
mitigation plan with the Local Planning Team (LPT) and provide a final opportunity for community
review and comment. Please read this whole email, as it is each community’s last opportunity to
provide review and input on the draft plan before finalization.
We ask that communities review two separate documents:
Base Plan
Hazard mitigation strategy (you only need to review for your community)
The deadline for these reviews is no later than 4 PM CT, Wednesday October 30.
Base Plan
The Base Plan document encompasses the main portions of the plan. It can be viewed here. The
base plan includes:
Section 1 Introduction and Planning Process
Section 2 Community Profile and Capabilities
Section 3 Risk Assessment
Section 4 Hazard Mitigation Strategy
Section 5 Plan Implementation and Maintenance
You’ll notice a few areas still highlighted in yellow as you read through the document; these are
areas where we are still collecting information through the process and will be finalized before the
plan goes out for public review. You’ll also notice a few references to appendices; these will be
developed with the final draft.
Hazard Mitigation Strategy
Thank you to each community that submitted updates to its hazard mitigation strategy. Please click
this link to access it. It should open up an Excel file with the mitigation strategy for the plan
compiled. You only need to review the actions for your community. The strategy contains each
mitigation action identified though the update process. Please make sure you review your
community’s strategy for accuracy. For most communities, we made some additional edits and
added any information that was missing. We also filled in some of the prioritization for each action
where it wasn’t provided. If you see anything that we did that you don’t agree with or want me to
change, please let me know and I’m happy to do it.
In addition to reviewing the document, please let me know if your community has any other hazard
mitigation actions you would like to add. We didn’t get many new hazard mitigation actions added
during the strategy update process, and we are asking communities to review and provide at least
ONE new hazard mitigation action to its strategy if the community hasn’t done so
already. There is still time to edit before we finalize the document and send it off to public review.
If you’d like any additional support in identifying and adding actions, please let me know.
Timeline and Next Steps
Please complete a review of this documentation and submit any new mitigation actions no
later than 4 PM CT, Wednesday October 30 . Send any feedback on your community
information or the base plan to me at kyle.karsjen@tidalbasingroup.com. If you have any
questions or would like support in adding any more hazard mitigation actions, please let me
know. Also please let me know if you have any access issues with the folder and we’ll figure
something else out.
Once each community has completed its review, the document will go out for public review. We’ll
ask for your help in sharing that document. I will send a separate email about that process soon.
Thank you,
Kyle
Kyle Karsjen
Senior Preparedness Specialist
Resilience, Mitigation and Policy
M:515.460.4711 kyle.karsjen@tidalbasingroup.com
tidalbasingroup.com
From:Kyle Karsjen
Bcc:Mayer, Bryan L; Kerry Evans; Kymmie Scott; Artig-Swomley, Gretchen - External Contact; ben.zender;
Brosnahan, David; Christopherson, Pat - External Contact; Diaz, Izzy; Hamdorf, Trevor; Hearden, Chris;
Butkowski, Heather - External Contact; Jason Mallinger; Linehan, Jack - External Contact; Mondor, Michael;
msather; Peterson, Greg; Judd.Freed@co.ramsey.mn.us; Sieben, Terry - External Contact; Don Smiley;
melissa.lawrence@gemlakemn.org; Ryan Schroeder; Jim Bownik; Mike Lovas; Christopher Hearden; Jim Lindner;
Matt Montain
Subject:Ramsey County Hazard Mitigation Plan - Public Review Draft sharing information
Date:Tuesday, December 10, 2024 9:00:00 AM
Attachments:WinterHazardSurveyFlyer-final pdf.pdf
social sharing text.docx
hazardmitigation-socialmedia-Final.jpg
image001.png
image002.png
Good morning!
We are pleased to announce that the Ramsey County Hazard Mitigation Plan (HMP) draft is
now ready for public review. The review period will last until Sunday, December 22. We are
asking communities to share the plan draft and opportunity to review using whatever
mechanisms you would normally use to share important information.
I have attached the following to this email:
A flyer has been developed that can be shared that includes the embedded links to the
plan and comment sheet (WinterHazardSurveyFlyer-final pdf). This flyer can be shared
via email to any of your partners that you think would find value in reviewing the full
HMP. If you share the survey via email, please cc me.
We’ve developed some materials that can be used to develop a post on social media. I
have attached the text that can be used (social sharing text); please ensure that the links
transfer to the posting. I have also attached an image that can be used in your post if you
wish as well (hazardmitigation-socialmedia-Final).
Finally, the plan will be shared on the Ramsey County website and Ramsey County social
media channels today.
When you do share the document, please remember to send me screenshots of the posting so
that I can include it in the plan. If you have any further questions, please let me know.
Thanks!
Kyle Karsjen
Senior Preparedness Specialist
Policy, Mitigation and Resilience
M:515.460.4711 kyle.karsjen@tidalbasingroup.com
tidalbasingroup.com
ramseycounty.us
Help shape the future of Ramsey County’s
Hazard Mitigation Plan.
We need your input!
Review the Plan
Review the plan.
Click the link: Ramsey County
Hazard Mitigation Plan –
Public Review Draft
Share Your Feedback
Fill out a quick survey.
Click the Link:
Ramsey County Hazard
Mitigation Plan – Feedback
Survey
We’re updating the plan to find ways to protect our communities from
hazards like flooding and severe winter storms. A draft is now ready for
you to review and share your thoughts.
1 2
For more information about the hazard mitigation process, please contact:
Ramsey County Emergency Management & Homeland Security (RCEMHS)
(651) 266-1017
bryan.mayer@ramseycounty.us
Español Hmoob Soomaali Oromoo Karen
Back to List
Help make Ramsey County safer – share your
input
Ramsey County wants to be ready for disasters and kee p people and property safe.
Natural disasters like tor nadoes, flooding, blizzards, and ice stor ms can cause serious
har m, including loss of life, proper ty damag e, and financial hardship.
To prepare, we’ve created a Hazard Mitig ation Plan to reduce the impact of these
disasters. T his plan looks at the most common hazards in our area, ranks them by
how often they happen and how much damag e they cause, and sug gests ways to
reduce the risks.
Read the draft Hazard Mitigation Plan (PDF)
Why your input matters
We want this plan to ref lect what’s impor tant to the people who live and work in
Ramsey County. Your experiences and ideas will help us create a plan that works for
ever yone.
Provide your feedback
We need your feedback to help us make Ramsey County safe! Share your thoughts by
Dec. 22.
Take the survey
What’s the goal?
Be prepared: Understand the risks and plan ahead.
• Protect lives and proper ty: Reduce the impact of disasters.
Home /News & Updates
R e s i d e n t s B u s i n e s s e s Yo u r G o v e r n m e n t
H o w d o I ...?
12/10/24, 3:09 PM Help make Ramsey County safer – share your input | Ramsey County
https://www.ramseycounty.us/content/Hazard-Mitigation-Plan-feedback-2024 1/2
• Build a stronger community: Help Ramsey County recover faster when
disasters happen.
Your input will make a big difference. Tog ether, we can create a plan that keeps our
community safe and pre pared for the future.
Posted on Tuesday, December 10, 2024 - 2:10 p.m.
12/10/24, 3:09 PM Help make Ramsey County safer – share your input | Ramsey County
https://www.ramseycounty.us/content/Hazard-Mitigation-Plan-feedback-2024 2/2
Español Hmoob Soomaali Oromoo Karen
Provide feedback on the
draft Hazard Mitigation
Plan
Contact us
In Ramsey County, both
emerg ency manag ement
and homeland security are
coordinated in a
comprehensive prog ram
under the Ramsey County
Emerg ency Manag ement
and Homeland Security
depar tment (RCEMHS). RCEMHS works with our local
municipalities, neighboring counties in the metro region, private
and nonprofit organizations, and state and federal par tners to
better pre pare for, respond to and recover from incidents ranging
from tornadoes to ter rorism.
In addition to coordinating and supporting our par tner ag encies,
Ramsey County Emergency Management is committed to the
pre paredness of our whole community. This includes working with
community g roups and leaders, businesses and individuals across
the diversity of Ramsey County to enhance our combined disaster
resiliency from the g round up.
Ramsey County's Emerg ency Manag ement prog ram was nationally-
accredited by the Emerg ency Management Accreditation
Prog ram in 2017.
Contact Us
Emergency Management
& Homeland Security
651-266-1020
Contact for m
Depar tment infor mation
Connect with us
Related
Resources
Emergency Management & Homeland Security
(http://www.youtube.com/user/R
County and city
Emergency Mana gement
contacts
Emergency Mana gement
2017-2021 Prog ram
Strategic Plan (PDF)
Federal Emergency
Management Agency
(http://www.fema.gov/)
Minnesota Homeland
Security and Emergency
Management
Sign up for emergency
notifications
Home /Your Government /Departments /Safety and Justice
R e s i d e n t s B u s i n e s s e s Yo u r G o v e r n m e n t
H o w d o I ...?
12/10/24, 3:11 PM Emergency Management & Homeland Security | Ramsey County
https://www.ramseycounty.us/your-government/departments/safety-and-justice/emergency-management-homeland-security 1/4
We have been working with our
communities to update the Ramsey
County Hazard Mitig ation Plan. We’re
updating the plan to find ways to
protect our communities from hazards
like f looding and severe winter stor ms.
Please review the draft and share your
thoughts:
Comments will be accepted through
December 22. For more infor mation
about the hazard mitig ation process,
contact Ramsey County Emerg ency
Manag ement & Homeland Security
(RCEMHS) at 651-266-1017 or
br yan.mayer@ramseycounty.us.
Foster resilience in Ramsey County through development of a
community-wide culture of preparedness and the coordination
of public safety effor ts to prevent, plan for, respond to,
mitig ate and recover from all hazards, disasters and
emerg encies – whether natural or human-caused, accidental or
intentional.
Visit our get involved page for more infor mation on our
volunteering in disaster ser vice.
Ramsey County Emerg ency Manag ement and Homeland
Security is responsible for the creation and maintenance of the
county’s Emergency Operations Plan and Mitig ation Plan.
Emergency Operations Plan
The R amsey County Emergency Operations
Plan deter mines who is in charg e under what situations and
how the actions of all ag encies par ticipating in the response
will be coordinated to ensure that people and proper ty will be
Review the draft plan (PDF)
Shar e your feedback
Mission
Emergency Operations Plan and
Mitigation Plan
12/10/24, 3:11 PM Emergency Management & Homeland Security | Ramsey County
https://www.ramseycounty.us/your-government/departments/safety-and-justice/emergency-management-homeland-security 2/4
protected in the safest and most effective way
possible. Ramsey County has a comprehensive, all-hazards
countywide Emergency Operations Plan. T he county and its
cities all use and are signatories on the same plan, which is
approved by the Federal Emerg ency Manag ement
Ag ency (FEMA (http://www.fema.gov/) ).
T he City of Saint Paul maintains its own Emergency
Operations Plan that coordinates with the county plan.
Multi-Hazard Mitigation Plan
T he Ramsey County Multi-Hazard Mitigation Plan (PDF)
identifies hazards in the county and how mitigation of those
hazards is prioritized and coordinated. The Ramsey County
All-Hazard Mitig ation Plan was last updated in 2019 and is
approved by FEMA.
Emergency manag ement reduces our community’s vulnerability
to disasters and increases our ability to cope with them.
Emergency manag ement is often thought of as a cycle:
Pr eparedness: planning, training, conducting drills and
exercises, testing equipment and public education.
Response: all of the actions immediately after a disaster
taken to save lives, as well as activities to protect proper ty
and the environment from the effects of the disaster.
Recover y: Retur ning a disaster-affected community to
“nor mal” after a disaster, including financial recover y and
rebuilding.
Mitigation: reducing or removing disaster risks in the
community.
Homeland security (http://www.dhs.gov/) involves working
with all aspects of public safety - from the federal level
to individual community members - to ensure the most
comprehensive and coordinated approach to the protection of
public safety from acts of ter rorism. It includes identification
of possible threats, prevention, effor ts to lessen potential
impacts and pre paration for events related to ter rorism.
About emergency management
About homeland security
12/10/24, 3:11 PM Emergency Management & Homeland Security | Ramsey County
https://www.ramseycounty.us/your-government/departments/safety-and-justice/emergency-management-homeland-security 3/4
Healthcare facilities looking for resources to meet the new
requirements from the Centers for Medicare and Medicaid
(CMS), please visit our CMS toolkit page.
Center s for Medicare & Medicaid (CMS) Toolkit
Resources for healthcare
facilities
12/10/24, 3:11 PM Emergency Management & Homeland Security | Ramsey County
https://www.ramseycounty.us/your-government/departments/safety-and-justice/emergency-management-homeland-security 4/4
From:Kyle Karsjen
Cc:Mayer, Bryan L
Bcc:ryan.kelzenberg@co.anoka.mn.us; allison.strohl@co.washington.mn.us; kelly.miller@co.dakota.mn.us;
eric.waage@co.hennepin.mn.us
Subject:Ramsey County Hazard Mitigation Plan - Available for Review
Date:Thursday, December 12, 2024 10:00:00 AM
Attachments:image001.png
Good morning,
Ramsey County is nearing completion toward updating its hazard mitigation plan. This plan
identifies community capabilities, provides an assessment of risks to the county and its
communities, and lays out community mitigation strategies that reduce risks posed by a
variety of hazards. The plan must be updated and approved by FEMA every five years to keep it
current and to maintain eligibility for mitigation grant assistance. The plan has been updated in
accordance with FEMA’s updated hazard mitigation planning guidance and is anticipated to be
submitted for FEMA approval by the end of the year. During the process, Ramsey County and
its communities have reviewed capabilities, assessed levels of risk to specific hazards, and
developed a comprehensive hazard mitigation strategy that builds on capabilities to buy down
those risks.
One of the key elements of the plan development process is inviting stakeholders to provide
input during the planning process. You have been identified by Ramsey County as a key
partner. The County invites you to provide any input or comment on the plan as they work
through the final stages of development.
We ask that you review the draft plan, which can be accessed here: Ramsey County Hazard
Mitigation Plan – Review Draft
Please provide any feedback utilizing this link: Ramsey County Hazard Mitigation Plan –
Feedback Survey
The plan will be available for stakeholder review and comment until December 22.
More information about hazard mitigation and mitigation planning can be found at
https://www.fema.gov/emergency-managers/risk-management/hazard-mitigation-planning.
Thank you,
Kyle
Kyle Karsjen
Senior Preparedness Specialist
Policy, Mitigation and Resilience
M:515.460.4711 kyle.karsjen@tidalbasingroup.com
tidalbasingroup.com
Page 1 of 2
CONSENT ITEM – 8L
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: David Swearingen, P.E. Public Works Director / City Engineer
SUBJECT: Lift Station 5 Forcemain Rehabilitation Project – Award Construction Contract
and Materials Testing Services
Budgeted Amount: Actual Amount: Funding Source:
$910,000 (Forcemain) $991,567.50 Sanitary Sewer Utility Fund
$130,000 (Pumps and Valves)
Council Should Consider
Motion to approve, table, or deny the following:
• Resolution 2025-027 Accepting Bid and Awarding the Construction Contract with
New Look Contracting, Inc. for the Lift Station 5 Forcemain Rehabilitation Project in
the amount of $729,901.50.
• Proposal from Braun Intertec, Inc. to provide construction testing services for the Lift
Station 5 Forcemain Rehabilitation Project in the amount of $10,582.
Background/Discussion
Pursuant Resolution 2025-014 adopted by City Council on February 10, 2025, City staff initiated
bid advertisement for the Lift Station 5 Forcemain Rehabilitation project. A total of six bids
were received on February 27, 2025. Bolton & Menk has provided a recommendation letter
along with the bid tab as Attachment A. Resolution 2025-027 will accept the bids and award the
construction contract with New Look Contracting, Inc. in the amount of $729,901.50.
New Look Contracting has a good reputation for successfully completing public works projects.
Staff has reviewed the bid and investigated New Look Contracting’s ability to complete the
project along with their proposed subcontractors. Staff recommends approving Resolution 2025-
027.
Page 2 of 2
Budget Impact
New Look Contracting, Inc. provided the low responsible bid with $729,901.50. The price
appears to be of good value as six bids were received, and the low bid was favorable compared
to the engineer’s estimate which was $886,562.
Total As-Bid Costs:
Construction (Primary) $ 729,901.50
Pumps & Valves (estimate) $ 130,000.00
Engineering Design $ 79,636.00
Construction Mgmt. $ 41,448.00
Materials Testing $ 10,582.00
TOTAL $ 991,567.50
Total Estimated Funding
Sanitary Sewer Utility Fund $ 1,040,000
TOTAL $ 1,040,000
The 2025-2029 CIP Budget includes funding in the amount of $1,040,000 for the proposed work.
Staff has reviewed the bid prices and recommends that the City proceed with the work.
Attachments
Attachment A: Bolton & Menk letter of recommendation and Bid Tabulation
Attachment B: Resolution 2025-027
Attachment C: Contract with New Look Contracting, Inc.
Attachment D: Proposal from Braun Intertec
H:\ARDH\0T1131511\1_Corres\C_To Others\Letter of Recommendation\Letter of Recommendation - Contract Award 03.03.2025.docx
March 4, 2025
Mr. David Swearingen
City of Arden Hills
1245 W Highway 96
Arden Hills, MN 55112
Re: Letter of Recommendation – Contract Award
Lift Station 5 Forcemain Replacement Project
City of Arden Hills, Minnesota
BMI Project No. 0T1.131511
Dear Mr. Swearingen:
Bids were received on February 27, 2025 at 1:00 p.m. for the above referenced project. The results are
shown in the table below:
BIDDERS TOTAL AMOUNT BID
1 New Look Contracting, Inc. $729,901.50
2 G M Contracting, Inc. $740,753.36
3 Minger Construction Co. Inc. $749,908.51
4 Northdale Construction Company, Inc. $763,251.07
5 Pember Companies, Inc. $878,554.50
6 Meyer Contracting Inc. $898,418.54
The engineer’s estimate was $890,000
New Look Contracting, Inc. provided the low responsible bid with $729,901.50. The price appears to be
of good value as we received six bids and the low bid was favorable compared to the engineer’s
estimate. New Look Contracting has a good reputation for successfully completing public works
projects. We have reviewed the bid and investigated New Look Contracting’s ability to complete the
project. They are utilizing subcontractors for some key project elements including the trenchless
forcemain installation, and sewer bypassing. The identified trenchless pipe installer subcontractor for
this project has been identified as Subsurface Construction, Inc. They have successfully completed
several projects with similar characteristics. The sewer byassing is proposed to be completed by
Northern Dewatering who is an industry leader in this type of work. New Look Contracting is proposing
to complete a majority of the remaining work including the lift station modifications; they have
completed this type of work successfully in the past. From our research and industry understanding,
New Look Contracting and key subcontractors are all suitable and experienced at completing their
respective work scope.
Given that the price appears to be of good value and New Look Contracting and their subcontractor(s)
appear to be experienced and qualified to complete the work, we recommend that the City of Arden
H:\ARDH\0T1131511\1_Corres\C_To Others\Letter of Recommendation\Letter of Recommendation - Contract Award 03.03.2025.docx
H:\ARDH\0T1131511\1_Corres\C_To Others\Letter of Recommendation\Letter of Recommendation - Contract Award 03.03.2025.docx
Hills award a contract to New Look Contracting, Inc. for the Lift Station 5 Forcemain Replacement
project.
Feel free to contact me if you have any questions or concerns regarding this letter of recommendation.
Sincerely,
Bolton & Menk, Inc.
Ryan Peterson, P.E.
Senior Project Engineer
Enclosures:
Bid Tab
Construction Contract – Lift Station 5 Forcemain Replacement
To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and clicking on Archived Documents under Helpful Links on our main webpage.
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2025-027
RESOLUTION ACCEPTING BID AND AUTHORIZING AWARD OF CONTRACT
FOR THE LIFT STATION 5 FORCEMAIN REHABILITATION ROJECT
WHEREAS, pursuant to an advertisement for bids for the Lift Station 5 Forcemain Rehabilitation
Project, bids were received, opened, and tabulated according to the law, and the following bids were
received complying with the advertisement:
New Look Contracting, Inc. $729,901.50
G M Contracting, Inc. $740,753.36
Minger Construction Co. Inc. $749,908.51
Northdale Construction Company, Inc. $763,251.07
Pember Companies, Inc. $878,554.50
Meyer Contracting Inc. $898,418.54
and;
WHEREAS, it appears that New Look Contracting, Inc. of Rogers, Minnesota, is the lowest
responsible bidder.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN HILLS,
MINNESOTA:
1. The Mayor and City Clerk are hereby authorized and directed to enter into the attached contract
with New Look Contracting, Inc. of Rogers, Minnesota in the name of the City of Arden Hills for
the Lift Station 5 Forcemain Rehabilitation Project according to the plans and specifications
therefore approved by the City Council and on file in the office of the City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits
made with their bids, except that the deposits of the successful bidder and the next lowest bidder
shall be retained until a contract has been signed.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 10TH
DAY OF MARCH, 2025.
____________________________________
David Grant, Mayor
ATTEST:
________________________
Julie Hanson, City Clerk
Lift Station 5 Forcemain Replacement AGREEMENT
City Project PW-0102 1 of 5
AGREEMENT BETWEEN OWNER AND CONTRACTOR
FOR CONSTRUCTION CONTRACT
THIS AGREEMENT is made this 10th day of March, 2025 (hereinafter “Effective Date of the Contract”) by
and between the City of Arden Hills, Ramsey County, Minnesota (hereinafter “Owner”) and New Look
Contracting, Inc. (hereinafter “Contractor”). The Owner and Contractor hereby agree as follows:
ARTICLE 1 – THE WORK AND THE PROJECT
1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work
is generally described as follows: Construction of a sanitary sewer forcemain replacement,
abandonment of the existing sanitary sewer forcemain, improvements to a sanitary lift station, and
appurtenant work.
1.02 The Project, of which the Work under the Contract Documents is a part is generally described as
follows: Lift Station 5 Forcemain Replacement, City Project No. PW-0102.
ARTICLE 2 – CONTRACT DOCUMENTS
1.01 The Contract Documents consist of the following:
A. This Agreement
B. Performance and Payment Bonds
C. Insurance Certificates
D. Instructions to Bidders
E. General Conditions
F. Supplementary Conditions
G. Division 1 – General Requirements
H. Division 2 – Special Provisions
I. Drawings (not attached by incorporated by reference) consisting of 21 sheets with each
sheet bearing the following general title: ARDEN HILLS FORCEMAIN REHAB PROJECT,
dated February 10, 2025.
J. Addenda (Numbers _ and _ inclusive)
K. Exhibits to the Agreement
1. Contractor’s Bid (pages _ to _ inclusive)
2. Non-Collusion Affidavit
3. Responsible Contractor Verification and Certification of Compliance Form
L. The following which may be delivered or issued on or after the Effective Date of the
Contract and are not attached hereto:
1. Notice to Proceed
2. Work Change Directives
3. Change Orders
4. Field Orders
2.02 This instrument, together with the documents hereinabove mentioned, form the Agreement, and
they are as fully a part of the Agreement as if hereto attached or herein repeated.
2.03 The Contract Documents may only be amended, modified, or supplemented as provided in the
General Conditions and Supplemental Conditions.
ARTICLE 3 – CONTRACT TIMES
3.01 Contract Times: The Work will be substantially completed on or before October 17, 2025 and
completed and ready for final payment in accordance with Paragraph 15.06 of the General
Conditions on or before December 7, 2025 Substantial Completion Date shall be defined as the
completion of all items with the exception of final lift of bituminous pavement and pavement striping.
Lift Station 5 Forcemain Replacement AGREEMENT
City Project PW-0102 2 of 5
3.02 All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final
payment as stated in the Contract Documents are of the essence of the Contract.
3.02.1 Milestones – Reference Plan Sheet G2.01 to understand the Phases described in
the Milestones
3.02.1.1 Milestone 1: Phase 1 – Lift Station work must be completed within 30 days of
completion of Milestones 2 and 3
3.02.1.2 Milestone 2: Phase 2 – Phase must be completed within 45 calendar days of
commencement. Full closure of County Road E must be re-opened within 14
calendar days of a full closure of the road. If the road is able to remain open
to traffic, the 14 calendar day roadway closure time limit shall not apply.
3.02.1.3 Milestone 3: Phase 3 – Phase must be completed within 45 calendar days of
commencement.
3.02.1.4 Milestone 4: Noble Ave Closure at Forcemain Directional Drilling Pit: Full
closure of Noble Road (Phase 2/Phase 3 Merge) must be re-opened within 28
calendar days of a full closure of the road.
3.02.1.5 Milestone 5: Abandonment of Existing Forcemain – Abandonment of existing
forcemain shall be completed within 14 calendar days of commencement of
abandonment activities starting and shall be completed by the Substantial
Completion Date.
3.03 Liquidated Damages: Contractor and Owner recognize that time is of the essence as stated above
and that Owner will suffer financial and other losses if the Work is not completed and Milestones
not achieved within the times specified in Paragraph 3.01 abov e, plus any extensions thereof
allowed in accordance with the Contract. The parties also recognize that delays, expense, and
difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner
if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and
Contractor agree that as liquidated damages for delay, but not as a penalty;
A. Substantial Completion: Contractor shall pay Owner $1,000.00 for each day that expires after
the time specified in Paragraph 3.01 above for Substantial Completion until the Work is
substantially complete, as duly adjusted pursuant to the Contract.
B. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect,
refuse, or fail to complete the remaining Work within the Contract Time for completion and
readiness for final payment, as duly adjusted pursuant to the Contract, Con tractor shall pay
Owner $300.00 for each day that expires after such time until the Work is completed and ready
for final payment.
C. Liquidated damages for failing to timely attain Substantial Completion and final completion are
not additive and will not be imposed concurrently.
ARTICLE 4 – CONTRACT PRICES
1.01 The Owner shall pay the Contractor for the performance of this Agreement according to the
schedule of approximate quantities and unit prices as set out in the Contract Documents submitted
by the Contractor on 02/27/2025, the aggregate of which is estimated to be $729,901.50.
1.02 The Contract shall include Base Bid items as provided on the Proposal Form.
1.03 Payment is based an amount equal to the sum of the extended prices, established for each
separately identified item of Unit Price Work by multiplying the unit price times the actual quantity
of that item completed and accepted by the Engineer.
1.04 The extended prices for Unit Price Work set forth as of the Effective Date of the Contract are based
on estimated quantities. As provided in Paragraph 13.03 of the General Conditions, estimated
quantities are not guaranteed, and determination of actual quantities and classifications are to be
made by the Engineer.
Lift Station 5 Forcemain Replacement AGREEMENT
City Project PW-0102 3 of 5
ARTICLE 5 – PAYMENT PROCEDURES
5.01 Progress Payments: Owner shall make progress payments on account of the Contract Price on
the basis of Contractor’s Applications for Payment on or about the 10th day of each month during
performance of the Work as provided in Paragraph 5.02 below, provided that such Applications for
Payment have been submitted in a timely manner and otherwise meet the requirements of the
Contract. All such payments will be measured by the Schedule of Values established as provided
in the General Conditions (and in the case of Unit Price Work based on the number of units
completed) or, in the event there is no Schedule of Values, as provided elsewhere in the Contract.
5.02 Retainage: Prior to Substantial Completion, progress payments will be made in an amount equal
to the percentage indicated below but, in each case, less the aggregate of payments previously
made and less such amounts as Owner may withhold, including b ut not limited to liquidated
damages, in accordance with the Contract.
A. Ninety five (95) percent of Work completed (with the balance being retainage).
B. No payment shall be made for materials and equipment not incorporated into the Work.
5.03 Upon Substantial Completion, Owner shall pay an amount sufficient to increase total payments to
Contractor to 100 percent of the Work completed, less such amounts set-off by Owner pursuant to
Paragraph 15.01E of the General Conditions, and less 200 percent of Engineer’s estimate of the
value of Work to be completed or corrected as shown on the punch list of items to be completed or
corrected prior to final payment.
5.04 Final Payment: Upon final completion and acceptance of the Work in accordance with Paragraph
15.06 of the General Conditions, Owner shall pay the remainder of the Contract Prices as
recommended by Engineer as provided in said Paragraph 15.06.
ARTICLE 6 – CONTRACTOR’S REPRESENTATIONS
6.01 In order to induce the Owner to enter into this Contract, Contractor makes the following
representations:
A. Contractor has examined and carefully studied the Contract Documents, and any data and
reference identified in the Contract Documents.
B. Contractor has visited the Site, conducted a thorough, alert visual examination of the Site and
adjacent areas, and become familiar with and is satisfied as to the general, local, and Site
conditions that may affect cost, progress, and performance of the Work.
C. Contractor is familiar with and is satisfied as to all laws and regulations that may affect cost,
progress, and performance of the Work.
D. Contractor has carefully studied all reports of explorations and tests of subsurface conditions
at or adjacent to the Site and all drawings of physical conditions relating to existing surface or
subsurface structures at the Site that have been identified in the Contract Documents, and
reports relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that
have been identified in the Contract Documents.
E. Contractor has considered the information known to Contractor itself; information commonly
known to contractors doing business in the locality of the Site; information and observations
obtained from visits to the Site; the Contract Documents; and the site-related reports identified
in the Contract Documents, with respect to the effect of such information, observation, and
documents on (1) the cost, progress and performance of the Work; (2) the means, methods,
techniques, sequences, and procedures of construction to be employed by the Contractor; and
(3) Contractor’s safety precautions and programs.
F. Based on the information and observations referred to in the preceding paragraph, Contractor
agrees that no further examinations, investigations, explorations, tests, studies, or data are
necessary for the performance of the Work at the Contract Price, within the Contract Times,
and in accordance with the other terms and conditions of the Contract.
Lift Station 5 Forcemain Replacement AGREEMENT
City Project PW-0102 4 of 5
G. Contractor is aware of the general nature of work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Contract Documents.
H. Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or
discrepancies that Contractor has discovered in the Contract Documents, and the written
resolution thereof by Engineer is acceptable to Contractor.
I. The Contract Documents are generally sufficient to indicate and convey understanding of all
terms and conditions for performance and furnishing of the Work.
J. Contractor’s entry into this Contract constitutes an incontrovertible representation by
Contractor that without exception all prices in the Agreement are premised upon performing
and furnishing the Work required by the Contract Documents.
ARTICLE 7 – MISCELLANEOUS
7.01 Terms: Terms used in the Agreement will have the meanings stated in the General Conditions and
Supplementary Conditions.
7.02 Assignment of Contract: Unless expressly agreed to elsewhere in the Contract, no assignment by
a party hereto of any rights under or interests in the Contract will be binding on another party hereto
without the written consent of the party sought to be bound; and, specifically but without limitation,
money that may become due and money that is due may not be assigned without such consent
(except to the extent that the effect of this restriction may be limited by law), and unless specifically
stated to the contrary in any written consent to an assignment, no assignment will release or
discharge the assignor from any duty or responsibility under the Contract Documents.
7.03 Successors and Assigns: Owner and Contractor each binds itself, its successors, assigns, and
legal representatives to the other party hereto, its successors, assigns, and legal representatives
in respect to all covenants, agreements, and obligations in the Contact Documents.
7.04 Severability: Any provision or part of the Contract Documents held to be void or unenforceable
under any law or regulation shall be deemed stricken, and all remaining provisions shall continue
to be valid and binding upon Owner and Contractor, who agree that the Contract Documents shall
be reformed to replace such stricken provision or part thereof with a valid and enforceable provision
that comes as close as possible to expressing the intention of the stricken provision.
7.05 Contractor’s Certifications
A. The provisions of Minn. Stat. 16C.285 Responsible Contractor are imposed as a requirement
of this Contract. This Contract may be terminated by the Owner at any time upon discovery by
the Owner that the prime contractor or subcontractor has submitted a fal se statement under
oath verifying compliance with any of the minimum criteria set forth in the Statute.
B. The provisions of Minn. Stat. 471.425, subdivision 4a regarding payments to subcontractors
are imposed as a requirement of this Contract.
REMAINDER OF THIS PAGE IS BLANK
Lift Station 5 Forcemain Replacement AGREEMENT
City Project PW-0102 5 of 5
IN WITNESS WHEREOF, Owner and Contractor have caused this instrument to be executed in duplicate
as of the Effective Date of the Contract.
OWNER: CONTRACTOR:
City of Arden Hills New Look Contracting, Inc
By: By:
Title: Mayor Title:
Attest: Attest:
Title: City Clerk Title:
Address for Giving Notices: Address for Giving Notices:
City of Arden Hills New Look Contracting, Inc.
Attention: Public Works Director Attention: Jarrod Sargent
1245 West Highway 96 14045 Northdale Blvd.
Arden Hills, MN 55112 Rogers, MN 55374
Braun Intertec Corporation
11001 Hampshire Avenue S
Minneapolis, MN 55438
Phone: 952.995.2000
Fax: 952.995.2020
Web: braunintertec.com
AA/EOE
March 3, 2025 Proposal QTB211164
Ryan Peterson, PE
Bolton & Menk, Inc.
10400 Viking Drive, Suite 100
Eden Prairie, MN 55344
Re: Proposal for Construction Testing Services
Lift Station 5 Force Main Replacement
Stowe Avenue to County Road E
Arden Hills, Minnesota
Dear Mr. Peterson:
Braun Intertec Corporation is pleased to submit this proposal to provide construction testing services for
the Lift Station 5 Force main Replacement in Arden Hills, Minnesota.
Our Understanding of the Project
We understand this project will include the construction of the force main rehabilitation in Arden Hills,
Minnesota. We understand the utility work will include trenchless, horizontal directional drilling (HDD)
installation of force main replacement along the existing walking path between Stowe Avenue and
County Road E. It is our understanding the installation will include 5 HDD pits and restoration of adjacent
surface features.
Available Information
This proposal was prepared using the following documents and information.
Project plans and specifications prepared by Bolton & Menk, Inc., dated February 10, 2025.
A Geotechnical Evaluation Report prepared by Braun Intertec dated January 23, 2024.
Scope of Services
Services are performed under the direction of a licensed professional engineer, on a periodic basis,
depending on the construction schedule and when they are requested by the general contractor. After
reviewing available information, we understand our scope of services for the project will be limited to
the tasks defined below.
Soil Related Services
Observe and evaluate the soils exposed in excavations to determine if the soils are similar to
those encountered with the geotechnical evaluation and suitable for support of fill or
pavements. Our engineer can provide consultation for conditions that appear to differ from
the geotechnical evaluation.
Perform laboratory mechanical analyses (gradations) of prospective fill materials.
Bolton & Menk, Inc.
Proposal QTB211164
March 3, 2025
Page 2
Perform laboratory Proctor tests to determine the maximum Proctor dry densities and
optimum moisture contents of prospective fill materials.
Observe the placement and compaction of fill.
Test compacted fill placed in utility trenches, to determine if the relative compaction was
achieved.
We have included additional engineering time to assist with the drilling process of the HDD in
case there are any obstructions.
Concrete Related Services
We have included periodic testing for the concrete curb and gutter replacement.
Observe the concrete placement and test sample preparation.
Engineering Review and Reporting Services
Provide engineering consulting services, review test results and observations reports.
Management, including scheduling of our field personnel and communication with the
contractor, owner, and design team.
Transmit results to the project team on weekly basis to the contractor, owner, and design
team.
Basis of Scope of Work
The fees associated with the proposed scope of services were estimated using the following
assumptions. If the construction schedule is modified or the contractor completes the various phases of
the project at different frequencies or durations than shown in this proposal, we may need to adjust the
overall fee accordingly. The scope of work and number of trips required to perform these services are as
shown in the attached table. Notable assumptions in developing our estimate include:
Assumptions regarding the number of trips for special inspections and testing are outlined in
the attached cost estimate table. As the contractor’s schedule becomes available and designs
are finalized, please review this proposed scope of work to determine if the project’s needs
and budget will be met.
The backfill used for the HDD pits will be the existing soil and will take one trip per pit for a
total of five trips.
No special site-specific training or gear is required to complete our scope of services.
Parking will be available on site for our vehicles.
Bolton & Menk, Inc.
Proposal QTB211164
March 3, 2025
Page 3
You, or others you may designate, will provide us with current and approved plans and
specifications for the project. Modification to these plans must also be sent to us so we can
review their incorporation into the work.
We will require a minimum of 24 hours’ notice for scheduling inspections for a specific time.
Shorter than 24 hours’ notice may impact our ability to perform the requested services, and
the associated impacts will be the responsibility of others.
Fees
We will furnish the services described in this proposal on a time and materials basis for an estimated fee
of $10,582. A tabulation showing hourly and unit rates associated with our proposed scope of services is
attached. The actual fees for our services will be based on the actual units or hours expended to meet
the requirements of the project documents.
This estimate was developed with the understanding that the scope of services defined herein will be
required and requested during our normal work hours of 7:00 a.m. to 5:00 p.m., Monday through Friday.
Services that we are asked to provide to meet the project requirements or the contractor’s construction
schedule outside our normal business hours will be invoiced using an overtime rate factor. The factor for
services provided outside our normal work hours or on Saturday will be 1.25 times the listed hourly rate
for the service provided. The factor for services provided on Sunday or legal holidays will be 1.5 times the
listed hourly rate for the service provided. We have not included premiums for overtime in our cost
estimate; however, we recommend that allowances and contingencies be made for overtime charges
based on conversations with the contractor. You will be billed only for services provided on a time and
materials basis.
Because our services are directly controlled by the schedule and performance of others, the actual cost
may vary from our estimate. It is difficult to project all of the services and the quantity of services that
may be required for any project. If services are required that are not discussed above, we will provide
them at the rates shown in the attached table or, if not shown, at our current Schedule of Charges. We
will invoice you on a monthly basis.
General Remarks
We will be happy to meet with you to discuss our proposed scope of services further and clarify the
various scope components.
We appreciate the opportunity to present this proposal to you. After reviewing this proposal, please sign
and return one copy to our office as notification of acceptance and authorization to proceed. If
anything in this proposal is not consistent with your requirements, please let us know immediately.
Braun Intertec will not release any written reports until we have received a signed agreement. Also,
ordering services from Braun Intertec constitutes acceptance of the terms of this proposal.
The proposed fee is based on the scope of services described and the assumption that our services will
be authorized within 30 days and that others will not delay us beyond our proposed schedule.
Bolton & Menk, Inc.
Proposal QTB211164
March 3, 2025
Page 4
Our services will be provided under the terms of the Subconsultant Master Agreement for Professional
Services between Bolton & Menk, Inc. and Braun Intertec Corporation, dated January 1, 2021.
To have questions answered or schedule a time to meet and discuss our approach to this project further,
please contact Michael Kudanovych at 952.607.5413 (mkudanovych@braunintertec.com) or
Brad McCarter at 612.708.2790 (bmccarter@braunintertec.com).
Sincerely,
BRAUN INTERTEC CORPORATION
Michael Kudanovych, EIT
Staff Engineer
Bradley J. McCarter, PE
Director, Senior Engineer
Attachments:
Project Proposal - QTB211164
The proposal is accepted. We will reimburse you in accordance with this agreement, and you are
authorized to proceed:
Authorizer’s Firm
Authorizer’s Signature
Authorizer’s Name (please print or type)
Authorizer’s Title
Date
Client:Service Description:Work Site Address:
Stowe Avenue to County Road E
Arden Hills, MN 55112
Bolton & Menk, Inc.
Ryan Peterson
Attn: Accounts Payable
1960 Premier Dr
Mankato, MN 56001
(952) 448-8838
Construction Materials Testing
Proposal Total:$10,582.00
Description Quantity Units Unit Price Extension
Phase 1 Construction and Materials Testing
Activity 1.1 Soil Observations and Testing $6,710.00
207 Compaction Testing 25.00 Hour 98.00 $2,450.00
Work Activity Detail Qty Units Hrs/Unit Extension
HDD Pit Backfill 5.00 Trips 5.00 25.00
1308 Nuclear moisture-density meter charge, per hour 25.00 Each 34.00 $850.00
1318 Moisture Density Relationship (Standard), per sample 3.00 Each 208.00 $624.00
1162 Sieve Analysis with No. 200 wash (ASTM C136 and C117)2.00 Each 164.00 $328.00
209 Sample pick-up 2.00 Hour 104.00 $208.00
1861 CMT Trip Charge 7.00 Each 50.00 $350.00
126 Project Engineer 10.00 Hour 190.00 $1,900.00
Activity 1.2 Concrete Observations and Testing $2,196.00
261 Concrete Testing 6.00 Hour 98.00 $588.00
Work Activity Detail Qty Units Hrs/Unit Extension
Curb & Gutter 2.00 Trips 3.00 6.00
278 Concrete Cylinder Pick up 2.00 Hour 104.00 $208.00
1364 Compressive strength of concrete cylinders (ASTM C 39),per
specimen
10.00 Each 42.00 $420.00
Work Activity Detail Qty Units Hrs/Unit Extension
Curb & Gutter 2.00 Sets 5.00 10.00
1861 CMT Trip Charge 4.00 Each 50.00 $200.00
118 Staff Engineer 5.00 Hour 156.00 $780.00
Activity 1.3 Engineering Review $1,676.00
238 Project Assistant 4.00 Hour 96.00 $384.00
125 Project Control Specialist 2.00 Hour 106.00 $212.00
128 Senior Engineer 5.00 Hour 216.00 $1,080.00
Phase 1 Total:$10,582.00
Page 1 of 103/03/2025 09:22 AM
Project Proposal
QTB211164
Lift Station 5 Forcemain Replacement
Page 1 of 1
CONSENT ITEM – 8M
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: David Swearingen, P.E. Public Works Director / City Engineer
SUBJECT: Xcel Energy Consent to Improvement - Lift Station 5 Forcemain Rehabilitation
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
Motions to approve, table, or deny the following:
• Consent to Improvements agreement between the City of Arden Hills and Xcel Energy.
Background/Discussion
Lift Station 5 has indicated a need to replace the existing forcemain, pumps and check valves. This
project is proposed for 2025 construction within the City’s Capital Improvement Plan (CIP).
The existing forcemain is 3250-feet in length, is made of cast iron pipe (CIP) and was installed in
1960. The route of the existing forcemain is within an easement that is located within residential
properties, it extends under residential streets and borders the neighboring City of New Brighton.
Replacement of the existing forcemain will be by directional drilling new 10-inch HDPE, 2400-ft
along the walking trail (Elmer Anderson Trail) from County Rd E to Stowe Ave. This area is also
within the Easement for Xcel Energy’s overhead transmission lines, therefore, for the City to install
a forcemain through this route it requires a Consent to Improvements agreement as seen in
(Attachment A).
Staff has reviewed the Consent to Improvements agreement and recommends the Council approve.
Budget Impact
N/A
Attachments
Attachment A: Consent to Improvements agreement
1 of 4
(RESERVED FOR RECORDING DATA)
RETURN TO: Xcel Energy
Siting & Land Rights, Seth Wight
414 Nicollet Mall, 06
Minneapolis, MN 55401
CONSENT TO IMPROVEMENTS
Line No. 0803 CITY OF ARDEN HILLS
THIS CONSENT TO IMPROVEMENTS (this “Consent”), dated the _____ day of _______________, 2025, is made by
and between The City of Arden Hills, their heirs, successors, and assigns (“Requestor”) and Northern States Power
Company, a Minnesota Corporation, herein referred to as “Xcel Energy”, having an office and place of business in the
City of Minneapolis, County of Hennepin, State of Minnesota.
WITNESSETH
WHEREAS, Xcel Energy obtained certain rights to construct and maintain facilities for the distribution and
transmission of electrical energy in, over and across the following described property owned by Requestor (the
“Premises”), by that document dated December 29th, 1967 and recorded on the , in Book of Deeds, page
, as Document No. (the “Easement”).
Premises:
A strip of land fifty (50) feet in width running over and across Section Thirty-three (33) and the Southeast Quarter
(SE¼) of Section Twenty-eight (28), all in Township Thirty (30) North, Range Twenty-three (23) West; said strip of
land being twenty-five (25) feet in width on each side of a center line which crosses above described tracts and is
described as follows, to-wit:
Commencing at a stake on the East line of Section Twenty-eight (28), nine hundred twelve (912) feet south of the
East Quarter-section corner thereof; running thence South forty-five degrees and forty-five minutes West (S 45° 45'
W) two thousand four hundred sixty-two and five-tenths (2462.5) feet to a stake on the South line of said section,
one thousand eight hundred thirty-three (1833) feet west of the Southeast corner thereof; thence continuing on
same course over and across Section Thirty-three (33) a distance of one thousand three hundred sixty-five and two-
tenths (1365.2) feet; thence on a five-degree curve to the left from said course as a tangent, a distance of three
hundred fifteen and one-tenth (315.1) feet; thence South twenty-nine degrees and fifty-seven minutes West (S 29°
57' W) one thousand seven hundred and three-tenths (1700.3) feet to a stake on the East and West Quarter-line
through Section Thirty-three (33), one thousand three hundred forty-two and two-tenths (1342.2) feet east of the
2 of 4
West Quarter-section corner thereof; thence continuing on the same course a distance of two thousand six hundred
twenty-five and eight-tenths (2625.8) feet to a stake on the West line of Section Thirty-three (33), three hundred
sixty-three and eight-tenths (363.8) feet north of the Southwest corner thereof;
Excepting therefrom, that part of said fifty (50) foot strip of land lying north of the Soo Line Railway Company
Right-of-Way, all in the Southeast Quarter (SE¼) of Section Twenty-eight (28), Township Thirty (30) North, Range
Twenty-three (23) West.
WHEREAS, Requestor has applied to Xcel Energy for permission to use a portion of the Easement for Public
Utilities purposes, hereinafter reffered to as (the “Easement Area”). The Easement Area affected by this Consent is
shown on Exhibit “B”, attached hereto.
NOW THEREFORE, in consideration of the promises exchanged herein, the parties for themselves and their
respective successors and assigns agree as follows:
1. Xcel Energy consents to Requestor’s use of the Easement Area for the purposes described in Exhibit “A”,
attached hereto and made a part hereof, subject to Requestor’s strict compliance with the terms set forth herein.
2. The Requestor acknowledges that it has inspected the Easement Area and determined it to be suitable for the
uses described in Paragraph 1 above. Requestor agrees that it is not relying on any oral or written representation
of Xcel Energy concerning the Easement Area (including but not limited to dimensions, soil conditions,
environmental conditions, and municipal restrictions, or use by adjoining or third parties).
3. No future work shall be conducted on the Easement Area until Requestor has received written approval from
Xcel Energy. As a condition to approval, Requestor shall submit detailed plans of the work and a description of
work procedures. Xcel Energy’s approval of any work or work procedures merely indicates its consent to the
proposed activities and does not constitute a representation or warranty concerning the suitability, prudency,
effectiveness, or propriety of the proposed activities.
4. Requestor agrees that within thirty (30) days of Xcel Energy’s submittal of an invoice, Requestor shall
reimburse Xcel Energy for its reasonable expenses to review any request for work (including but not limited to
costs for administrative review, engineering and field inspection).
5. Prior to commencing work, Requestor shall designate a representative who will supervise the work, be present
during all work, and be authorized to control and, if necessary, suspend the work.
6. Requestor shall immediately suspend its work if requested by Xcel Energy. If suspension is required due to
Requestor’s failure to strictly comply with the terms of this Consent, upon such suspension the parties shall
consult in an effort to cure such noncompliance so that the Requestor may resume its activities.
7. Requestor shall not at any time use or store any pollutant or hazardous material within the Easement Area, and
shall at all times maintain the Easement Area in a safe and lawful condition.
8. Requestor shall, at its sole cost and risk, obtain all permits, consents or approvals required for its occupancy and
use of the Easement Area. Upon Xcel Energy’s request, Requestor shall provide evidence reasonably
satisfactory to Xcel Energy that all required consents or permits are in force for Requestor’s use of the Easement
Area.
9. As part of Xcel Energy’s business operations, Xcel Energy shall have the right, at any time and without liability
or compensation to Requestor, to use the Easement Area to install, use, repair, maintain, relocate or remove
facilities that presently exist or may in the future be located within the Easement Area.
3 of 4
10. LIMITATION OF LIABILITY; INDEMNITY. Requestor shall indemnify, defend and hold Xcel Energy, its
agents, employees, and affiliates harmless from any cost, liability, damage, loss, claim, action or proceeding
whatsoever for injury to persons (including death) or damage to property which may arise from or be claimed to
have arisen from Requestor’s exercise of the rights granted in this Consent. Requestor, on behalf of itself, its
successors, assigns, and representatives, hereby releases Xcel Energy from any liability for damages incurred by
Requestor, its successors, assigns, representatives, employees, agents, or those under its control arising from (1)
Xcel Energy’s use and improvement of the Easement Area for its business purposes, (2) the existing condition of
the Easement Area, (3) Xcel Energy’s future installations, (4) Xcel Energy’s actions reasonably necessary to
protect its property during emergency conditions, or (5) Xcel Energy’s exercise of its rights to remove
improvements, grading or other work installed within the Easement Area by or on behalf of Requestor without
Xcel Energy’s prior approval.
11. Unless otherwise provided for as part of the conditions for approval, throughout the time Requestor is
conducting work on the Easement Area, Requestor shall insure that any contractor conducting said work shall
maintain and provide evidence to Xcel Energy of insurance coverage at least equivalent to the following or
Requestor shall provide, at Requestor’s expense, the following coverage:
a. Worker’s Compensation at statutory limits with Employers Liability coverage of at least $100,000
limits if such party is at any time during the term of this Consent subject to the requirements of any
applicable law governing worker’s compensation.
b. Comprehensive General Liability Coverage, (including blanket contractual liability) against claims for
bodily injury, death and property damage, including environmental damage, arising out of such party’s
operations, affording combined single limit protection of One Million Dollars ($1,000,000) with respect
to personal injury or death and property damage, including environmental damage.
All policies shall be endorsed to (1) name Xcel Energy its directors, officers, employees and affiliates as
additional insured with respect to any and all bodily injury and/or property damage, and (2) to require thirty (30)
days written notice be given to Xcel Energy prior to any cancellation or material changes in the policy.
[The balance of the page is left intentionally blank]
4 of 4
N WITNESS WHEREOF, the parties have caused this Consent to be executed on the date aforementioned.
City of Arden Hills
_________________________________
By:
It’s:
NORTHERN STATES POWER COMPANY,
a Minnesota corporation
____________________________________
Peter D. Gitzen, Manager
Siting & Land Rights
Xcel Energy Services Inc.
an Authorized Agent for
Northern States Power Company
STATE OF )
) ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this ___ day of _________________________, 2025, by
________________________________________,________________________________________ .
(Stamp)
_________________________________________
Notary Public
My Commission Expires: ______________________
STATE OF )
) ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this _______ day of ___________, 2025, by Peter D. Gitzen,
Manager, Siting and Land Rights, Xcel Energy Services, Inc., as an authorized agent for Northern States Power Company, a
Minnesota corporation, on behalf of the corporation.
(Stamp)
_________________________________________
Notary Public
My Commission Expires: ______________________
This Instrument Drafted By: Seth Wight, an employee of Xcel Energy, 414 Nicollet Mall, Minneapolis, MN 55401
ATTACHED TO AND MADE A PART OF CONSENT TO IMPROVEMENTS
DATED ______________, 2025, BETWEEN
XCEL ENERGY and CITY OF ARDEN HILLS
EXHIBIT “A”
SCOPE OF PROJECT.
This project consists of the construction of a sanitary sewer force main between the northerly transmission line poles and the
northerly easement line. The proposed project meets Xcel Energy’s standards, provided the following conditions are adhered to:
(1) Excavation close to structure location.
A minimum distance of 20 feet of supported earth must be maintained from any part of the line structure. Support
of the ground beyond the 20 feet may be provided by a slope no greater than three feet horizontal to one foot vertical.
Support may also be provided by the use of cribbing, sheet piling, retaining wall or tunneling. The specific plan for
providing the required support and the excavation plan for the proposed project must be submitted to Xcel Energy
for review and approval prior to construction start.
(2) Grade change around structure location.
Fill around or above the structure is not permitted. The grade around the structures must provide for surface water
runoff – no surface water ponding around structures will be permitted. Any cost related to the adjustment of Xcel
Energy’s facilities will be at the requestor’s expense.
(3) Grade change within easement.
The ground elevation within the Easement Area shall not be increased above the existing grade. Stockpiling of soil
and/or material within the Easement Area will not be permitted. Any proposed grade changes required for the site
driveway must be reviewed and approved by Xcel Energy prior to the start of construction.
(4) Clearances to equipment and workers – Transmission Line 0803 69 kV
Any construction activities occurring near the transmission line(s) shall comply with all OSHA Safety Clearances.
If these clearances cannot be maintained, the contractor or developer must request a line outage by calling Xcel
Energy's System Operations Department. Outages are not guaranteed. If an outage is possible, adequate advanced
notice must be provided in order to schedule the line outage.
The applicable clearance value for Cranes & Equipment from Table 1 below, according to the specific voltage, is
required at all times between the energized electrical conductors and any cranes or equipment used in construction
activities.
The applicable clearance value for Unqualified Workers from Table 1 below, according to the specific voltage, is
required at all times between the energized electrical conductors and construction workers.
Disclaimer:
Ultimately, it is the responsibility of the worker to verify the provided OSHA clearances are current and accurate,
and to adhere to such clearances. Xcel Energy accepts no liability for any incorrect or out of date clearances values,
or misuse of the clearance values.
OSHA Website: https://www.osha.gov/laws-regs/regulations/standardnumber
Table 1: Minimum approach distances for equipment and unqualified workers performing
work near power lines
Maximum System Operating
Voltagea
(V = Volts, kV = Kilovolts) Cranes & Equipment Doing Workb
Unqualified
Workersg, h
Operator
Requirements
Qualifiedc Qualifiedc -
Minimum
Safeguards
Proximity alarm, or
unqualified spotter, or
range control deviced
Mark
Boundarye, f
-
up to 750 V 10'-0'' 20'-0'' 10'-0"
up to 50 kV 10'-0'' 20'-0'' 10'-0"
69 kV 15'-0'' 20'-0'' 10'-9"
115 kV 15'-0'' 20'-0'' 12'-5"
138 kV 15'-0'' 20'-0'' 13'-3"
161 kV 15'-0'' 20'-0'' 14'-0"
230 kV 20'-0'' 20'-0'' 15'-5"
345 kV 20'-0'' 20'-0'' 20'-5"
500 kV 25'-0'' 50'-0'' 26'-9"
Table 1 Footnotes:
a Operating voltage may be AC or DC, phase-to-phase, or phase-to-ground. An unqualified worker is not
expected to be able to distinguish.
b Per OSHA Table A, 29 CFR 1926.1408.
c Must be qualified per OSHA 29 CFR 1926.1408(g).
d Must meet requirements per OSHA 29 CFR 1926.1407 and OSHA 29 CFR 1926.1408(b), use one of the
following: (1) a proximity alarm, (2) a dedicated spotter, (3) a device that automatically warns the operator
when to stop movement, such as a range control warning device, (4) a device that automatically limits range
of movement, set to prevent encroachment, or (5) an insulating link/device.
e Per OSHA 29 CFR 1926.1408(a)(2)(ii), and 1926.1409(a), use minimum controls boundary
f Per OSHA 29 CFR 1926.1408 (a)(1)(i), mark boundaries at or outside your MAD with items such as flags or
range limit/range control warning devices. The operator must not operate the crane beyond those boundaries.
g This includes any worker not in a vehicle, such as workers performing work on the ground, or on elevated
platforms or scaffolding. Includes allowance for worker’s reach and reach with conductive objects.
h Clearance values determined according to OSHA 1910.333(c)(3)(i)(A)(2).
The OSHA requirements in this section must be included on the plan sets and specifications given to contractors.
(5) Building on easements.
There shall be no additional permanent or temporary buildings allowed within the easement area, without prior
written approval from Xcel Energy.
(6) Fuel and refueling on easements.
There shall be no fuel tanks stored or refueling of vehicles and equipment within the easement.
(7) Streetlights and signs on easements.
If there are to be streetlights, signboards, identification signs or any other type of non-building structure within the
easement, detailed plans must be submitted to Xcel Energy prior to construction for review and approval to verify
compliance with electrical code clearances prior to construction start.
Metallic structures must be properly grounded. The same working clearance criteria as stated in paragraph (4) also
applies, for equipment used to erect and install light standards, sign boards, etc. Any metallic structure, pole, wire
or item placed in the vicinity of a high-voltage transmission line will have the potential to become electrically charged
due to electrical induction. The development of an electric charge results in a potential difference between the metal
installation and the ground, which can result in electrical shocks when the item is touched. Placement of such metallic
installation should take into consideration the shock potential during the; construction, intended use AND future
maintenance activities. Items which become charged must be connected to a grounding rod or grounding system to
prevent shocks.
(8) Notification.
Prior to the start of construction and following project completion, the requestor or contractor must notify Xcel
Energy. Please contact Seth Wight at (612) 342-8926, or by email at seth.j.wight@xcelenergy.com
It is the express condition of this consent that all other terms and conditions of that certain easement shall remain in full force
and effect.
NOTICE REGARDING LIMITATION OF LIABILITY: Requester understands and agrees that pursuant to the
foregoing consent provisions, Xcel Energy is not liable for any damages it or any other party may cause to the improvements
authorized herein.
(Line 0803: Str’s 53-58)
COUNTY RD
GRAND RD
NOBLE RD
STOWE AVE
L
A
K
E
J
O
H
A
N
N
A
B
L
V
D
4T
H
A
V
E
THE 2020 EDITION OF THE MINNESOTA DEPARTMENT OF
TRANSPORTATION "STANDARD SPECIFICATIONS FOR
CONSTRUCTION" AND "2022 SUPPLEMENTAL
SPECIFICATIONS" SHALL GOVERN.
PROJECT LOCATION
SHEET
NUMBER SHEET TITLE
GENERAL
G0.01 - G0.03 TITLE SHEET, LEGEND, GENERAL NOTES
G1.01 STATEMENT OF ESTIMATED QUANTITIES
G2.01 LOCATION, PHASING, AND FORCEMAIN
ABANDONMENT PLAN
CIVIL
C0.01 - C0.02 EXISTING CONDITIONS, & REMOVALS PLAN
C1.01 - C1.02 STANDARD DETAILS
C4.01 - C4.05 SANITARY FORCEMAIN PLAN & PROFILE AND
RESTORATION PLAN
C4.06 - C4.11 LIFT STATION MODIFICATION PLANS
C7.01 TRAFFIC CONTROL
THIS PLAN SET CONTAINS 20 SHEETS.
FEETSCALE
0 500250
HORIZONTAL DIRECTIONAL DRILLING HDPE SANITARY SEWER FORCEMAIN, SANITARY SEWER LIFT STATION VALVE
VAULT ADDITION, RESTORATION
SEPTEMBER, 2024
MAP OF THE
CITY OF ARDEN HILLS
RAMSEY COUNTY, MN
CITY OF ARDEN HILLS
CONSTRUCTION PLANS FOR
CITY OF ARDEN HILLS LIFT STATION 5
FORCEMAIN REPLACEMENT PROJECT
R
12224 NICOLLET AVENUE
BURNSVILLE, MINNESOTA 55337
Phone: (952) 890-0509
Email: Burnsville@bolton-menk.com
www.bolton-menk.comR
SHEET
B
o
l
t
o
n
&
M
e
n
k
,
I
n
c
.
20
2
4
,
A
l
l
R
i
g
h
t
s
R
e
s
e
r
v
e
d
c H:
\
A
R
D
H
\
0
T
1
1
3
1
5
1
1
\
C
A
D
\
C
3
D
\
1
3
1
5
1
1
_
G
_
T
I
T
L
E
S
H
E
E
T
.
d
w
g
9/
1
1
/
2
0
2
4
3
:
1
5
:
0
3
P
M
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
ISSUED FOR DATENO.CITY OF ARDEN HILLS
ARDEN HILLS FORCEMAIN REHAB PROJECT
0T1131511DATELIC. NO.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
RYAN PETERSON
42844 MM/DD/YYYY
AAA
AAA
RP G0.01
TITLE SHEET
GRANT RD
COUN
T
Y
R
D
E
NOBLE RD
STOWE AVE
4T
H
A
V
E
12224 NICOLLET AVENUE
BURNSVILLE, MINNESOTA 55337
Phone: (952) 890-0509
Email: Burnsville@bolton-menk.com
www.bolton-menk.comR
SHEET
B
o
l
t
o
n
&
M
e
n
k
,
I
n
c
.
20
2
4
,
A
l
l
R
i
g
h
t
s
R
e
s
e
r
v
e
d
c H:
\
A
R
D
H
\
0
T
1
1
3
1
5
1
1
\
C
A
D
\
C
3
D
\
1
3
1
5
1
1
_
G
_
L
O
C
A
T
I
O
N
.
d
w
g
9/
1
1
/
2
0
2
4
3
:
1
5
:
1
1
P
M
DESIGNED
DRAWN
CHECKED
CLIENT PROJ. NO.
ISSUED FOR DATENO.CITY OF ARDEN HILLS
ARDEN HILLS FORCEMAIN REHAB PROJECT
0T1131511DATELIC. NO.
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED
BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED
PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA.
RYAN PETERSON
42844 MM/DD/YYYY
AAA
AAA
RP
R
G2.01
LOCATION, PHASING PLAN & FORCEMAIN ABANDONMENT PLANFEETSCALE
0 50 100
HORZ.
LEGEND
ABANDONMENT FORCEMAIN
PHASE 1 (LIFT STATION)
PHASE 2 (NEW FPRCEMAIN)
PHASE 3 (NEW FORCEMAIN)
3182 LF ABANDON FORCEMAIN
Page 1 of 1
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
FROM: Jessica Jagoe, City Administrator
SUBJECT: Hiring of Public Works Maintenance Parks Lead
Budgeted Amount: Actual Amount: Funding Source:
$126,231 (Salary & Benefits)
N/A N/A
Council Should Consider
Motions to approve, table, or deny the following:
• Appointing Mike Christofore to the position of Public Works Maintenance Parks Lead
Discussion
The Council recently approved converting one full-time Public Works Maintenance position to that
of a Parks Lead and following a recruitment process in which there were two applicants, Mike
Christofore has been selected for Council consideration. Mike has been employed with the City of
Arden Hills since 2015.
Budget Impact
This role is currently budgeted for and this hiring will not adversely affect the budget.
Attachment
N/A
CONSENT ITEM – 8N
MEMORANDUM
Page 1 of 1
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
FROM: Jessica Jagoe, City Administrator
SUBJECT: Hiring of Public Works Maintenance Utilities Lead
Budgeted Amount: Actual Amount: Funding Source:
$126,231 (Salary & Benefits) N/A N/A
Council Should Consider
Motions to approve, table, or deny the following:
• Appointing Max Arvidson to the position of Public Works Maintenance Utilities Lead
Discussion
The Council recently approved converting one full-time Public Works Maintenance position to that
of a Utilities Lead and following a recruitment process in which there was one applicant, Max
Arvidson has been selected for Council consideration. Max has been employed with the City of
Arden Hills since 2010.
Budget Impact
This role is currently budgeted for and this hiring will not adversely affect the budget.
Attachment
N/A
CONSENT ITEM – 8O
MEMORANDUM
Page 1 of 1
CONSENT ITEM – 8P
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
FROM: Jessica Jagoe, City Administrator
SUBJECT: Authorization to Recruit for a Community Development Director
Budgeted Amount: Actual Amount: Funding Source:
$165,725 TBD Various Funds
Council Should Consider
Motions to approve, table, or deny the following:
• Recruitment for a Community Development Director
Background
The City has an open Community Development Director position. This authorization will allow Staff
to begin the recruitment process, which is outlined below.
Anticipated process:
-Council approves authorization to begin the recruitment process
-Staff posts for the position
-Staff reviews applications and selects candidates to interview
-Staff will conduct necessary interviews of selected candidates and select candidates to be
interviewed by the City Council
-City Council will interview the selected candidates and choose a finalist for approval
In the past, the full City Council has interviewed Director level positions. Staff is moving forward
with this assumption unless Council changes it as part of the approval process. Another consideration
when hiring for Director positions, the City has on occasion conducted work-related psychological
evaluations. This has not been factored into the above anticipated process. The Council should
advise if there is a preference to include that as part of this recruitment process.
Budget Impact
This position is an existing position and already budgeted for; this should not have an impact on the
City’s budget.
Attachments
Attachment A – Community Development Director Job Description
1
CITY OF ARDEN HILLS
POSITION DESCRIPTION
Position Title: Community Development Director
Department: Community Development
Accountable to: City Administrator
Positions Supervised: Building Official, Senior Planner
Status: Regular Full Time
May 2024
PRIMARY OBJECTIVES
Responsible for the management and supervision of the Department with direct reports under the Planning &
Zoning and Building Departments. Performs complex and highly technical professional work managing and
directing all planning including comprehensive plan, development review, zoning administration, as well as
building inspection, code enforcement, rental registration, and community development activities. This position
is responsible for identifying public-private partnerships for new economic opportunities, assisting in the daily
City operations, assuring compliance with City policies, goals and programs, and related work as apparent or
assigned. This is a unique and dynamic position where the person in this role will also serve as the City Planner
for technical and complex development reviews. Responsible for oversight of all planning duties and delegates
work to the Senior Planner. This person in this role will be expected to think big picture for the City but also
manage detailed planning work on a day-to-day basis with significant responsibility for interdepartmental
coordination for community development activities. Work involves recommending and setting policies and goals
under the direction of the City Administrator. Departmental supervision is exercised over Building Official, and
Senior Planner. Limited oversight is exercised over the Building and Code Enforcement Inspector.
QUALIFICATION REQUIREMENTS
To perform this job successfully, an individual must be able to perform each essential function satisfactorily.
The requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable
accommodations may be made to enable individuals with disabilities to perform the essential functions.
ESSENTIAL FUNCTIONS OF THE POSITION
Department supervision overseeing and responsible for guiding, coaching and supervising employees,
selecting and overseeing consultants, and establishing and administering departmental priorities, policies and
procedures for Departments under Community Development.
Serves as the principal planner and zoning administrator for the City of Arden Hills.
Performs hands-on detailed technical planning work on planning cases and delegates planning activities to the
Senior Planner as appropriate; this position will be expected to handle planning cases from beginning to end.
This will include, but not be limited to, review of PUD’s, CUP’s, variances, Comprehensive Plan Amendments.
Receives and processes zoning and land use applications, completes detailed analysis for conformity with City
Codes, prepares case files, coordinates publication of notices to property owners as necessary, and presents
cases to Planning Commission and the City Council.
Oversees and coordinates community development activities, providing technical and administrative assistance
to property owners, promoting development and redevelopment activities, and assists in the marketing of
2
properties within the City; responsible for identifying and managing the elements essential to the success of all
aspects of Economic Development and (re)development projects.
Serves as staff liaison to the Planning Commission and Executive Director at the Economic Development
Authority.
Guides the development and implementation of city codes and ordinances, particularly as it relates to zoning,
land use and community standards. Identifies areas for improvement within the City Code and works to build
clarity and consensus to ensure codes and ordinances align with the Comprehensive Plan.
Administers and maintains the Comprehensive Plan for the development of the City and assists with multi-year
small area plans as directed by the City Administrator.
Conducts research, interprets data, and prepares reports and recommendations on issues and projects as
assigned, which may impact the economic vitality of the City.
Reviews city ordinances, programs, and policies pertaining to the Department and recommends updates as
needed to the City Administrator and City Council.
Ensures developer compliance with Council directives and development contracts.
Supervises, plans, and organizes activities in the areas of Planning, Building Inspections, Economic
Development and Code Enforcement to ensure the most effective functioning department; supervises and
assists the Senior Planner in developing, changing and implementing land use plans, regulations, and policies.
Serves as the Development Director for the TCAAP Joint Development Authority.
Supervises and assists the Building Official to ensure positive and effective enforcement of City plans, policies,
and ordinances, including monitoring developer compliance with Council directives and development contracts.
Performs complex professional work related to site plan review, preparing development agreements, economic
development, business subsidy assistance, writing proposals and other duties as assigned.
Performs special assignments and projects as assigned by the City Administrator and City Council.
Provides technical assistance to City departments on projects and activities as directed by the City Administrator.
Represents the City on various boards and to various state, metropolitan and county agencies.
Prepares and recommends departmental operating and capital budgets to the City Administrator and Finance
Director.
Monitors activities of various local, regional, state and federal organizations and governments that may impact
local planning authority and decision making and reports such activities to the City Administrator in a timely
manner.
Monitors level, flow and progress of building and zoning permits and code enforcement activities. Works with the
Department to resolve issues, anticipate challenges and align resources to demands.
Attends all City Council meetings, Planning Commission, Economic Development Authority meetings, and other
meetings as appropriate.
3
Serves as the Acting City Administrator in absence of City Administrator.
Other duties as assigned.
EDUCATION and/or EXPERIENCE
Bachelor’s degree with coursework in urban planning, public administration, urban and regional studies, or
related field and considerable experience in planning, economic development, management, or equivalent
combination of education and experience. Master’s degree, Minnesota local government experience and
previous supervisory experience preferred.
A minimum of five years of experience as a City Planner, or similar role, is required.
KNOWLEDGE, SKILLS AND ABILITIES
Comprehensive knowledge of the principles and practices of local government functions and practices; thorough
knowledge of municipal planning duties and processes to include, but not limited to, Planned Unit Developments,
Conditional Use Permits, variances, and Comprehensive Plan Amendments; comprehensive knowledge of State
Statutes related to planning and economic development; comprehensive knowledge of economics and municipal
finance as they apply to City community development; thorough knowledge of current literature and recent
developments in the field; general knowledge of the principles and practices of civil engineering as they relate to
planning and subdivision design and control; ability to maintain confidentiality; ability to organize, prioritize, and
communicate community development work plans; develop goals, policies, plans and procedures related to
management of the department and development projects; ability to interpret and analyze technical and
statistical information to prepare and present technical oral and written reports; ability to use standard office
equipment including related hardware and software; ability to communicate effectively with governing bodies,
the public, and developers; ability to establish and maintain professional working relationships with employees,
officials, other agencies and the general public.
PHYSICAL DEMANDS
This work requires the occasional exertion of up to 10 pounds of force; work regularly requires sitting, frequently
requires speaking or hearing and repetitive motions and occasionally requires using hands to finger, handle or
feel, reaching with hands and arms and lifting; work has standard vision requirements; vocal communication is
required for expressing or exchanging ideas by means of the spoken word; hearing is required to perceive
information at normal spoken word levels; work requires preparing and analyzing written or computer data,
operating machines and observing general surroundings and activities; work occasionally requires exposure to
outdoor weather conditions; work is generally in a quiet location (e.g. library, private offices).
SPECIAL REQUIREMENTS
Valid driver's license.
SELECTION GUIDELINES
Formal application, rating of education and experience; oral interview and reference check; job related tests may
be required. The duties listed above are intended only as illustrations of the various types of work that may be
performed. The omission of specific statements of duties does not exclude them from the position if the work is
similar, related or a logical assignment to the position.
CITY OF ARDEN HILLS IS AN EQUAL OPPORTUNITY EMPLOYER
___________________________________________________________________
NON-DISCRIMINATION POLICY
The City of Arden Hills does not discriminate
on the basis of handicapped status
in the admission or access to or treatment or employment
in its programs and activities.
______________________________________________________________
Page 1 of 2
CONSENT ITEM – 8Q
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Lucas J. Miller, Assistant Public Works Director
David Swearingen, P.E. Public Works Director / City Engineer
SUBJECT: 2025 Street Maintenance Program – Reclamite Streets
Budgeted Amount: Estimated Amount: Funding Source:
$272,500 $65,709 Street Maintenance Fund
Council Should Consider
Motions to approve, table, or deny the following:
• Cooperative Agreement and Cost Share between Ramsey County and Arden Hills in
the amount of $65,709 for the Reclamite portion of the 2025 Street Maintenance
Program project.
Background/Discussion
Following up to the weekly admin update to Council in February, the opportunity to partner with
Ramsey County on the Reclamite portion of the Street Maintenance for 2025 in broken down
within the Ramsey County Cooperative Agreement with Arden Hills (Attachment B). This was
opportune, considering this scope of maintenance is not offered by the Coon Rapids JPA, which
Arden Hills participates in yearly, and this partnership with Ramsey County would still give
Arden Hills a better chance at competitive pricing with the economy of scale by partnering with
a larger project using the same street maintenance method and product.
Outlined within Attachment A, the Reclamite maintained streets that are proposed are: Arden
Oaks Dr, Arden Oaks Ct, Old Snelling Ave, Cummings Ln, Jerrold Ave, Edgewater Ave, Glen
Paul Ave and Prior Ave. Staff selected these streets for street maintenance with Reclamite due to
the recommended application of this product being in the third or fourth year of life of a new
roadway. These streets were all resurfaced between 2021 and 2022, making it the ideal time for
this type of street maintenance and is in line with Arden Hills’ 6-year Street Maintenance Cycle
rotation.
Page 2 of 2
City Staff has worked with Ramsey County Staff throughout the design phase and have reviewed
the plans and specifications and recommends that Council approve the Cooperative Agreement
and Cost Share as outlined in Attachment B. A bid date is not yet finalized but is expected to
take place in April with the street maintenance taking place during the early part of the summer
months. Assuming the pricing is in line with engineer’s estimate, Staff would proceed with the
work along with Ramsey County.
Budget Impact
The 2025 Operating Budget includes funding in the amount of $275,000 for the proposed work
under the 2025 Street Maintenance Program and other annual costs related to resurfacing, such
as the internally led trail paving project and the JPA Seal Coating program with Coon Rapids.
The projected final costs are as follows:
• JPA estimated cost is approximately $203,963
• PW in-house paving estimated cost is approximately $6,475
• Reclamite Project with Ramsey County-Estimate is $65,709
Total projected cost for 2025 Street Maintenance is approximately $276,147, which is projected
to be $3,647 over budget.
Attachments
Attachment A: Reclamite Street Maintenance Map
Attachment B: Ramsey County Cooperative Agreement & Cost Share
PW 2025-03 Page 1 of 5
Agreement PW2025-03
RAMSEY COUNTY
COOPERATIVE AGREEMENT
WITH THE CITY OF ARDEN HILLS FOR
Construction of Reclamite Treatment on Various County and City Roads
P8108
Total Project Cost: $278,660.00
City of Arden Hills Cost: $65,709,00
Attachments:
A- Project Location Map
B- Engineers Estimate
This Agreement is between the City of Arden Hills, a municipal corporation ("City") and
Ramsey County, a political subdivision of the State of Minnesota, ("County") for the
application of reclamite asphalt rejuvenator on various roadways, as shown on
Attachment A (“Project”).
RECITALS
1. The Project is identified in Ramsey County’s 2025 – 2029 Transportation Improvement
Program.
AGREEMENTS
1. Responsibility for Design Engineering
1.1. The County will prepare plans, specifications, and proposals for the Project.
1.2. Plans for the Project showing proposed construction will be presented to the City
and will be on file at Ramsey County Public Works Department.
1.3. Any costs associated with Project revisions after the completion of plans and
specifications will be paid for by the party requesting the revisions. Revisions are
subject to approval by the County.
2. Procurement and Award of Contract
2.1. The County will take bids in accordance with state law and County procedures.
PW 2025-03 Page 2 of 5
2.2. The County will prepare an abstract of bids and a cost participation summary
based on the lowest responsible bidder’s proposal, and will provide the same to
the City.
2.3. The County will request the City’s concurrence to award a contract to the lowest
responsible bidder.
2.4. The County will award a contract, and pay the contractor from the State Sales
Tax, and local funds identified for the Project.
3. Responsibility for Construction Engineering
3.1. The County shall perform or contract the performance of the construction
engineering for all elements of the Project at no cost to the City
4. Project Costs
4.1. A list of the construction pay items and percentages of City funding responsibility
as well as the total estimated City Project cost is attached as Attachment B.
Quantities and unit prices in Attachment B are estimates. Actual costs shall be
based on the contract unit prices and the quantities constructed.
4.2. Design Engineering Costs
4.2.1. The County will cover all design engineering fees for this project.
4.3. Construction Engineering Costs
4.3.1. The City shall pay the County a construction engineering fee equal to
12% of the City’s share of the items identified in Attachment B.
4.3.2. Construction engineering shall be calculated based on the final contract
quantities and unit prices.
5. Payment Schedule
5.1. The County will invoice the City for construction costs incurred on a monthly
basis or as determined by the payment schedule for the contractor.
5.2. Construction engineering will be invoiced at the time of substantial project
completion, as determined by the County.
5.3. Payment will be made within 30 days of receipt of an invoice.
PW 2025-03 Page 3 of 5
6. Ownership and Maintenance Responsibility for Project Elements
6.1. Ownership and Maintenance Responsibility of the Roadway
6.1.1. The County will own and maintain the roadway and associated roadway
elements location within the County Right of Way, except as detailed
below.
6.1.2. The City will own and maintain the sidewalk, including snow removal and
sidewalk panel replacement.
7. The City grants the County temporary construction permits over all City owned rights-
of-way and property within the limits of the Project for use during construction at no
cost to the County.
8. The City and County shall indemnify, defend, and hold each other harmless against
any and all liability, losses, costs, damages, expenses, claims, or actions, including
attorney’s fees, which the indemnified party, its officials, agents, or employees may
hereafter sustain, incur, or be required to pay, arising out of or by reason of any act or
omission of the indemnifying party, its officials, agents, or employees, in the
execution, performance, or failure to adequately perform the indemnifying party’s
obligation pursuant to this Agreement. Nothing in this Agreement shall constitute a
waiver by the County or the City of any statutory or common law immunities, limits, or
exceptions on liability.
9. This Agreement shall remain in full force and effect until terminated by mutual
agreement of the parties.
THE REMAINDER OF THIS PAGE IN INTENTIONALLY BLANK.
CITY OF Arden Hills, MINNESOTA
By: _______________________________ Date:_______________________
Mayor
By: _______________________________ Date:_______________________
Director of Public Works
Approved by the Office of Financial Services:
By: _______________________________
PW 2025-03 Page 4 of 5
Approved as to Form:
By: _______________________________
City Attorney
PW 2025-03 Page 5 of 5
RAMSEY COUNTY, MINNESOTA
_________________________________ Date: ____________________________
Ling Becker, County Manager
Approval recommended:
_________________________________
Brad Estochen, Ramsey County Engineer
Public Works Department
Approved as to form:
_________________________________
Assistant County Attorney
ATTACHMENT A
PROJECT LOCATION MAP
Application of Asphalt Rejuvenator on Various Roads
Ramsey County Department of Public Works
1425 Paul Kirkwold Drive
Arden Hills, Minnesota 55112
SEGMENT A
SEGMENT D
SEGMENT C
SEGMENTS F, G, H, I
SEGMENT B
SEGMENT E
SEGMENTS J, K
SEGMENTS L, M
Ramsey County Public Works
2025 Rejuvenator Project - P8108
ENGINEERS ESTIMATE
QUANTITY COST QUANITY COST
1 2021.501 MOBILIZATION LUMP SUM 1 $2,500.00 0.79 $1,975.00 0.21 $525.00 $2,500.00
2 2123.610 STREET SWEEPER (WITH PICKUP BROOM)HOUR 15 $275.00 10 $2,750.00 5.0 $1,375.00 $4,125.00
3 2355.604 EMULSIFIED MALTENE-BASED REJUVENATING AGENT SQ YD 209,228 $1.25 164,317 $205,396.25 44,911 $56,138.75 $261,535.00
4 2563.601 TRAFFIC CONTROL LUMP SUM 1 $3,000.00 0.79 $2,370.00 0.21 $630.00 $3,000.00
5 2563.613 PORTABLE CHANGEABLE MESSAGE SIGN UDAY 60 $125.00 60 $7,500.00 $0.00 $7,500.00
$219,991.25 $58,668.75 278,660.00$
Construction Engineering Costs $7,040.25
Total $65,709.00
Attachment B
Bid Item
No.
MnDOT
Item No.Item Description UNITS TOTAL
QUANTITY
RAMSEY COUNTY CITY OF ARDEN HILLSUNIT PRICE ITEM TOTAL
Page 1 of 1
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Joua Yang, Finance Director
SUBJECT: Public Hearing Regarding the 2025-2029 Capital Improvement Plan (CIP) for
the Issuance of General Obligation CIP Bonds
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
Holding the required Public Hearing regarding the 2025-2029 Capital Improvement Plan for the
Issuance of General Obligation CIP Bonds
Background
At the February 10, 2025 Regular Council Meeting, the City Council adopted Resolution 2025-
018 Providing for the Issuance and Sale of General Obligation CIP Bonds.
Stacie Kvilvang from Ehlers, the City’s Municipal Advisor, will be presenting on the Five-Year
(2025-2029) Capital Improvement Plan.
Attachments
Attachment A: Five-Year (2025-2029) Capital Improvement Plan
PUBLIC HEARING – 10A
MEMORANDUM
BUILDING COMMUNITIES. IT’S WHAT WE DO.
Prepared by:
Ehlers
3060 Centre Pointe Drive
Roseville, Minnesota 55113
March 10, 2025
FIVE–YEAR CAPITAL IMPROVEMENT PLAN FOR ISSUANCE OF
GENERAL OBLIGATION CIP BONDS:
City of Arden Hills, Minnesota
2025–2029
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 1
I. INTRODUCTION ________________________________________________ 2
II. PURPOSE ______________________________________________________ 2
III. PLANNING PROCESS ____________________________________________ 2
IV. PROJECT SUMMARY ____________________________________________ 4
V. FINANCING ____________________________________________________ 7
VI. PLAN CONTINUATION ___________________________________________ 8
APPENDIX A _______________________________________________________ 9
APPENDIX B _______________________________________________________ 10
TABLE OF CONTENTS
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 2
I. INTRODUCTION
In 2003, the Minnesota State Legislature adopted Minnesota Statutes, Section
475.521 (the “CIP Act”), which allows municipalities to issue bonds under a Capital
Improvement Plan (the “CIP”) without a referendum requirement (except for the
“reverse referendum” as described below). The CIP Act applies to specific capital
improvements, including city halls, public works, and public safety facilities. The
2005 Legislature added towns to the meaning of a municipality, as well as libraries
and town halls to the meaning of a capital improvements.
Throughout this plan, the term “Capital Improvement” refers only to those
improvements identified in the CIP Act, as summarized above. Capital expenditures
for other public improvements in the City of Arden Hills, Minnesota (the “City”) will
be financed through other means identified in their annual budgeting process and
are not governed by this plan.
II. PURPOSE
A Capital Improvement, as defined in the CIP Act, is a major expenditure for the
acquisition or betterment to public lands, buildings, or other improvements used as
a city hall, town hall, library, public safety, or public works facility, any of which have
a useful life greater than five years. For the purposes of the CIP Act, Capital
Improvements do not include light rail transit or related activities, parks,
road/bridges, administrative buildings other than a city or town hall, or lands for those
facilities.
As identified by the CIP Act, a CIP is a document designed to anticipate Capital
Improvement expenditures over at least a five-year period so that they may be
acquired, constructed, and/or installed in a cost-effective and efficient manner. The
CIP must set forth the estimated schedule, timing, and details of specific Capital
Improvements by year, together with the estimated cost, needs for improvement,
and sources of revenue to pay for the improvement.
The City believes the capital planning process is an essential element of responsible
fiscal management and engages in adoption of an updated five-year plan for city-
wide capital expenditures annually as part of its budgeting process. Major capital
expenditures can be anticipated and coordinated to minimize potentially adverse
financial impacts caused by the timing and magnitude of capital outlays. As potential
expenditures are reviewed, the City considers the benefits, costs, alternatives, and
impacts on operating expenditures. This coordination of capital expenditures is
important to the City in achieving its goals of adequate physical assets and sound
fiscal management.
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 3
III. PLANNING PROCESS
The City Council annually reviews its capital expenditures according to their priority,
fiscal impact, and available funding as part of its budgeting process. The City
assembles the specific capital expenditures to be undertaken within the next five
years. The City Council prepares a plan based on the available funding sources.
From this information, a preliminary plan is prepared for public discussion. Changes
are then made based on that input, and a final plan is established.
Over the life of the plan, once the funding becomes available the specific capital
expenditures can be made as part of individual project approvals. In subsequent
years, the process is repeated as expenditures are completed and new needs arise.
Since this CIP calls for general obligation bonds to finance certain Capital
Improvements (“CIP Bonds”), the City Council must follow an additional set of
procedures. The City may adopt a CIP specifically for those Capital Improvements
and address the factors identified within the CIP Act. This CIP is designed to
supplement the City’s established process. The City Council must hold a public
hearing regarding issuance of the CIP Bonds to obtain public comment on the
matter. Notice of such hearing must be published in the official newspaper of the
municipality at least 14, but not more than 28 days prior to the date of the public
hearing. In addition, the notice may be posted on the City’s official website.
The City Council must approve the sale of CIP Bonds by a 3/5ths vote of its
membership. However, issuance of CIP Bonds is also subject to reverse
referendum: if a petition is signed by voters equal to at least five percent of the votes
cast in the City in last municipal general election and is filed with the City Clerk within
30 days after the public hearing, the CIP Bonds may not be issued unless approved
by a majority of voters voting on the question of issuing the obligations. Further, the
maximum debt service in any year on all outstanding CIP Bonds is 0.16% of the
estimated market value of property in the City, using the market value for the taxes-
payable year in which the bonds are issued.
After the CIP has been approved and general obligation bonds have been
authorized, the City collaborates with its municipal advisor to prepare a bond sale
and repayment schedule. Assuming no petition for a referendum is filed, the bonds
are sold, and when proceeds from the sale of the bonds (and any other identified
revenue sources) become available, prior qualifying expenditures for specified
Capital Improvements can be reimbursed and new expenditures made.
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 4
IV. PROJECT SUMMARY
The expenditures to be undertaken with this CIP for the years 2025 to 2029 are
limited to those listed in Appendix A. All other foreseeable capital expenditures within
the City government will come through other funding sources as identified within the
City’s annual budgeting process.
The CIP Act requires the City Council to consider eight factors in preparing the CIP
and authorizing general obligation bonds.
1. Condition of the City’s existing infrastructure, including projected need for
repair or replacement.
2. Likely demand for the proposed improvement(s).
3. Estimated cost of the proposed improvement(s).
4. Available public resources.
5. Level of overlapping debt in the City.
6. Relative benefits and costs of alternative uses of funds.
7. Operating costs of the proposed improvement(s).
8. Alternatives for providing services most efficiently through shared facilities
with other cities or local governments.
The City has considered the eight points as they relate to the project identified in
Appendix A and more thoroughly defined below through the issuance of CIP Bonds.
Conditions of City Infrastructure and Need for the Project
The City has a joint Fire Department (Lake Johanna Fire Department) (“LJFD”) with
the cities of North Oaks and Shoreview. The LJFD currently has three (3) fire stations
servicing the member cities. As these facilities continue to age and the demands for
programs and services evolve, the participating cities must maintain and renovate
the existing grounds and buildings and/or acquire or build new facilities. To evaluate
these needs, the participating cities and LJFD regularly reviews both the conditions
of its facilities as well as the changing needs for, and mandates placed upon, its
activities and services.
In 2018, consistent with this effort, the participating cities and LJFD engaged Buetow
2 Architects to complete a long-range planning study for a new fire station to replace
the existing Fire Station 4 (“Study”). Based on the Study, the participating cities and
LJFD identified the need to build a new fire station to meet the needs of the fire
fighters and the cities served by the LJFD. The Study identified:
The existing Fire Station No. 4 does not provide appropriate site area to be
able to expand to meet the needs of the cities, specifically to accommodate
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 5
(i) a full-time staff and sleeping quarters; (ii) larger trucks, (iii) training rooms;
and health/wellness facilities and reporting rooms; (iv) enough space to store
modern firefighting apparatuses; (v) decontamination space; (vi) adequate
parking; (vii) outdoor space for fire fighters; (vii) lack of separation between
apparatus bays and living spaces; and (viii) no staging area for trailers or
equipment.
The new facility will be able to allow the other two stations to gain space by
moving some of their equipment to it and move administrative offices from
Station 3, thus freeing up space there to convert existing offices to sleeping
quarters.
The new facility will improve the capability of the City to support the health
and well-being of firefighters, which will both improve the quality of life for
firefighters and enhance City services; and.
By relocating and constructing a new Fire Station No. 4, the City will continue
to provide high-quality services and response times.
Demand for the Project
Like all municipalities, the City must deliver services that provide for the health,
safety, and welfare of its residents and staff. To best serve the community and
complete their responsibilities both efficiently and safely, City staff need adequate
equipment and facilities. The existing Station 4 is unable to effectively meet current
and future operational needs.
In the response to these demands and to better meet the expected service levels of
the member cities and fire fighters, the participating cities decided to construct a new
Fire Station 4, as the most efficient and effective option. The new Station 4 will
provide long-term solutions to meet the demands, both current and future, of the
participating cities and LJFD.
Estimated Cost of the Project
The overall project is preliminarily estimated to cost up to $24,000,000 inclusive of
construction and soft costs. The City’s proportionate share of this is anticipated to
be $4,425,000. Construction contracts are anticipated to be awarded in February
2025. The final bonding amount, not to exceed $4,680,000, will be subject to City
Council approval after contracts are approved for the project.
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 6
Availability of Public Resources
To effectively and reasonably support the costs of the projects, the City determined
to finance the project through the issuance of general obligation bonds. Given the
cost of the proposed project, however, debt will be necessary to preserve sufficient
operating and capital reserves for the City.
Level of Overlapping Debt
Taxing District
2023/24 Adjusted
Taxable Net Tax
Capacity
In City (%)Total GO
Debt
City
Share
Ramsey County 868,599,789.00$ 2.5026% 170,500,000$ 4,266,933$
ISD No. 621 156,521,339 13.4110% 153,315,000 20,561,075
ISD No. 623 104,387,430 0.7154% 167,200,000 1,196,149
Metropolitan Council 6,313,906,529 0.3443% 159,410,000 548,849
$26,573,005
Overlapping Debt
Total Share of Overlapping Debt
Relative Costs and Benefits of Alternative Uses of the Funds
The space limitations within Station 4 and land it sits on, its age and the desire for
increased operational efficiencies drive the need for this project in the City. The
participating cities and LJFD did explore alternatives such as renovation and
expansion of the existing facility but determined this would not fully meet its needs.
Operating Costs of the Proposed Improvements
Moving forward with a full-scale replacement facility will provide the space and
functionality necessary to sustain fire operations for more than 50 years. The
proposed facility includes several long-term operating cost savings measures,
including (i) the use a variety of energy efficient materials and upgrades to the
lighting and HVAC systems; (ii) climate-controlled storage for essential equipment
and vehicles, which will reduce repair and replacement costs; (iii) provide a safer
and healthier workplace for firefighters and reduce costs associated workplace
injuries and lost time; and (iv) enhance response time and improve communication
and training.
Options for Shared Facilities with Other Local Governments
The facility is a shared facility with its member cities of the LJFD.
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 7
V. FINANCING
The total amount of proposed expenditures under this CIP is up to $105,000,000. If
these expenditures are to be funded, that amount of money is anticipated to be
generated through the sale of general obligation CIP Bonds within the identified five-
year period. The anticipated bond size of $4,680,000 is based upon funding the
City’s proportionate share of the estimated hard and soft costs identified for the
project, plus estimated issuance costs, capitalized interest and contingency and may
be issued in one or more series of bonds, at one time or from time to time. Principal
and interest on the CIP Bonds will be paid through a combination of property tax levy
and franchise fees and current estimates of size and repayment of the CIP Bonds
under consideration is shown in Appendix B.
In financing the CIP, two significant statutory limitations apply:
1. Under Chapter 475, with few exceptions, cities cannot incur debt in excess of 3%
of the assessor’s estimated market value (EMV) for the city. As noted in the table
below, the City’s debt subject to this requirement, including the proposed CIP
Bonds, is within the required threshold:
Assessor's Estimated Market Value 1,844,682,400
Multiply by 3% 0.03
Statutory Debt Limit 55,340,472
Less: Debt Paid Solely from Taxes 0
Less: Proposed Bond Issue(s)(4,680,000)
Unused Debt Limit 50,660,472
Net Debt Limit
2. A separate limitation under the CIP Act is that, without referendum, the total
amount of principal and interest in any single year payable on all CIP Bonds
issued by the City cannot exceed 0.16% of the total estimated market value in
the municipality. In the City, that maximum annual debt service amount is
$2,951,492 for pay 2025. The highest annual principal and interest payments on
the proposed Bonds to be issued under this CIP are estimated to be
approximately $421,000. As such, debt service on the CIP Bonds will be within
the annual limits under the CIP Act.
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 8
Assessor's Estimated Market Value 1,844,682,400
Multiply by 0.16% 0.16%
Statutory Debt Limit 2,951,492
Less: Existing Debt Service Subject to the Limit 0
Less: Proposed Bond Issue (421,248)
Unused Debt Limit 2,530,244
CIP Bonds Debt Service Limit
VI. PLAN CONTINUATION
This CIP will be reviewed annually by the City Council using the process outlined in
this document. Through annual amendment, the City Council reviews proposed
expenditures, makes priority decisions, and seeks funding for those expenditures it
deems necessary for the City. If deemed appropriate, the City Council should
prepare an update to this CIP for future CIP Bond issuance.
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 9
APPENDIX A
Plan Project Costs
Year Project Amount
2025 Fire Station $4,680,000
2026 None Anticipated -
2027 None Anticipated -
2028 None Anticipated -
2029 None Anticipated -
Total $4,680,000
Project Costs
Proposed CIP Bond Issues
Year Amount
2025 $4,680,000
2026 -
2027 -
2028 -
2029 -
Total $4,680,000
Proposed CIP Bond Issues
Note: The amounts and timing of these proposed CIP Bond issues may change
at the discretion of the City Council.
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 10
VII. APPENDIX B
Proposed CIP Bond Issue:
City of Arden Hills, Minnesota
Five-Year Capital Improvement Plan for Bond Issuance 11
Page 1 of 3
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Joua Yang, Finance Director
SUBJECT: Adopting Resolution 2025-028 Approving the 2025-2029 Capital Improvement
Plan (CIP ) and Approving the Issuance of Capital Improvement Plan Bonds
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
Motion to approve, table or deny the following:
Resolution 2025-028 Approving the 2025-2029 Capital Improvement Plan and
Approving the Issuance of Capital Improvement Plan Bonds
Background
In 2024, the City Council held an Open House with residents and discussed at length, the cost
and financing options for the new Lake Johanna fire station, with the construction of the new
station anticipated to begin in the spring of 2025. The City Council adopted an Electric Franchise
Fee Ordinance with Xcel Energy (Northern States Power Company) on October 28, 2024 for the
collection of franchise fees in order to finance the new fire station. On December 9, 2024, the
City Council adopted the 2025-2029 CIP budget which included franchise fee assumptions of
$435,000 annually to offset debt service for the new fire station.
At the February 10, 2025 Regular Council Meeting, the City Council adopted Resolution 2025 -
018 Providing for the Issuance and Sale of General Obligation CIP Bonds in an amount of
$4,680,000 for 15 years to cover the City’s proportionate share of the estimated $24M of
construction costs. The annual debt service payments are anticipated to be approximately
$420,000 annually with the bond proceeds expected to be available on May 20, 2025. The Lake
Johanna Fire Department had their bid opening on January 30, 2025 for the construction and
project totals and the City’s proportionate share will likely be reduced through this process based
on the final numbers. Staff will work with Ehlers to incorporate the updated bond amount into
the Official Statement, the formal disclosure document of terms and features of the bond.
NEW BUSINESS – 11A
MEMORANDUM
Page 2 of 3
Capital Improvement Plan Bonding
In 2003, the Minnesota State Legislature adopted Minnesota Statutes, Section 475.521 (the “CIP
Act”), which allows municipalities to issue bonds under a Capital Improvement Plan (the “CIP”)
without a referendum requirement (except for the “reverse referendum” as described below). The
CIP Act applies to specific capital improvements, including city halls, public works, and public
safety facilities.
To issue bonds under the CIP Act, the City Council must follow an additional set of procedures,
which includes a public hearing on a Five-Year (2025-2029) Capital Improvement Plan and the
plan of finance. The public hearing notice was to issue CIP bonds in an amount not to exceed
$4,680,000, even though staff anticipates this amount will be reduced based upon the
construction bids received.
Below is the bonding schedule of events, with the public hearing on the CIP held today. After
consideration and approval of the CIP and plan of finance by at least a 3/5th vote of the Council,
the issuance of the bonds is subject to a 30-day reverse referendum period. During this time, if
the City receives a petition requesting a vote on the issuance of the bonds from at least 5% of the
voters in the last general election, then a question regarding the issuance would need to be
presented at a special election. It should be noted that the question on the ballot would be if the
city should issue this type of bond (CIP bond) to finance the project or use cash, not on the
project itself. If this occurs, the City could choose to:
1. Place the issue on a special election (likely wouldn’t work with timing needed for the
funds)
2. Issue another type of bond which isn’t subject to reverse referendum; or
3. Use cash
Action Date Purpose
Public Hearing on
CIP
March 10,
2025
Allows voters the ability to comment and ask questions
related to the bond issuance.
Reverse Referendum
Period Ends
April 11,
2025
Allows voters to contest via petition (5% of votes).
Official Statement Mid-April Ehlers provides to City Council the formal disclosure
document which describes the terms and features of the
bonds to be sold to investors.
Rating Call with
S&P
Week of
April 21st
Rating agency assigns a bond rating to the sale and
provide judgement of the City’s overall credit.
Sale of Bonds April 28,
2025
Ehlers solicits bids and proposals for the sale of City’s
bonds.
Closing on Bond
Proceeds
May 20,
2025
Ehlers coordinates with the City and K&G on closing
documents and wiring of funds.
Page 3 of 3
Historically, cities have not received petitions for these types of projects due to the need and
outreach completed by cities. Staff is of the opinion that there has been adequate community
outreach regarding the need and costs of the project.
Attachments
Attachment A: Resolution 2025-028 Approving the 2025-2029 Capital Improvement Plan and
Approving the Issuance of Capital Improvement Plan Bonds
1
AR200-22-1008751.v3
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2025-028
RESOLUTION APPROVING A CAPITAL IMPROVEMENT PLAN AND
APPROVING THE ISSUANCE OF
CAPITAL IMPROVEMENT PLAN BONDS
BE IT RESOLVED by the City Council (the “Council”) of the City of Arden Hills, Minnesota
(the “City”) as follows:
Section 1. Background.
1.01. The City is authorized under Minnesota Statutes, Chapter 475, as amended (the “Act”),
including Minnesota Statutes, Section 475.521, as amended (“Section 475.521”) to prepare a capital
improvement plan and carry out programs for financing certain capital improvements, and to issue
general obligation bonds to finance the cost of capital improvements described in the plan.
1.02. Before the approval of the plan and issuance of any general obligation bonds under the
Act, the City is required to hold a public hearing on the plan and issuance of the bonds.
1.03. Pursuant to Section 475.521, the City has caused to be prepared a five-year capital
improvement plan (the “Plan”), which describes certain capital improvements in the City for the years
2025 through 2029.
1.04. The City has determined that it is in its best interests to provide for the issuance and sale
of capital improvement plan bonds pursuant to the Act, including Section 475.521, in an aggregate
principal amount not to exceed $4,680,000, to finance the capital improvements set forth in the Plan
including to finance the City’s proportionate share of the construction and equipping of a new fire station
within the City (the “Capital Improvements”).
1.05. On this date, the Council held a public hearing on the Plan and the issuance of the bonds,
after publication in the City’s official newspaper of a notice of public hearing at least 14 days but no more
than 28 days before the date of the public hearing.
Section 2. Plan Approved.
2.01. The Council finds that the Capital Improvements set forth in the Plan will serve the
interests of the City as a whole.
2.02. The Plan is approved in the form on file in City Hall.
2.03. Pursuant to Minnesota Statutes, Section 462.356, subd. 2, the Council, by at least three-
fifths vote of all of its members, finds that the Plan and the Capital Improvements to be financed with the
bonds do not impact and do not have a relationship to the City’s comprehensive plan; the Plan and the
Capital Improvements are consistent with the City’s comprehensive plan; therefore, the Council dispenses
2
AR200-22-1008751.v3
with the requirements of Minnesota Statutes, Section 462.356, subd. 2 relating to planning commission
review of the Plan and the Capital Improvements.
Section 3. Authorization.
3.01. It is hereby found, determined and declared that the City should issue its General Obligation
Capital Improvement Plan Bonds, Series 2025A (the “Bonds”) in the maximum aggregate principal amount
of $4,680,000, pursuant to the Act, including Section 475.521, in order to finance the Capital Improvements
under the Plan, including financing the City’s proportionate share of the construction and equipping of a new
fire station within the City and related financing costs.
3.02. If a valid petition requesting a vote on the issuance of the Bonds, signed by voters equal to
5% of the votes cast in the last municipal general election, is filed with the City Clerk within 30 days after the
date of the public hearing, the City may issue the Bonds only after obtaining approval of a majority of voters
voting on the question at an election.
3.03. City staff are authorized and directed to take all other actions necessary to carry out the
intent of this resolution.
The motion for adoption of the foregoing resolution was duly seconded by Member ________,
and upon vote being taken thereon, the following voted in favor thereof:
and the following voted against the same:
whereupon said resolution was declared duly passed and adopted.
Approved this 10th day of March, 2025, by the City Council of the City of Arden Hills, Minnesota.
CITY OF ARDEN HILLS, MINNESOTA
Mayor
ATTEST:
City Clerk
Page 1 of 1
NEW BUSINESS – 11B
MEMORANDUM
DATE: March 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: David Swearingen, P.E. Public Works Director / City Engineer
SUBJECT: Adopt-A-Park Application – Shoreview/Arden Hills Rotary Club for Floral Park
Budgeted Amount: Actual Amount: Funding Source:
$4,500 $500 Parks – 101-45200-44030
Council Should Consider
Motions to approve, table, or deny the following:
• Approving the Resolution 2025-029 Accepting the Adopt-A-Park Application from
Arden Hills/Shoreview Rotary Club for Floral Park through 2025 and 2026.
Background/Discussion
The Arden Hills/Shoreview Rotary Club has applied to adopt Floral Park for 2025 and 2026
(Attachment A). If Council so chooses, Attachment B is Resolution 2025-029, which will
approve that Floral Park will be adopted by the Arden Hills/Shoreview Rotary Club for that
timeframe and work will be coordinated as stated within the resolution.
A list of Volunteer Projects has been prepared by a resident volunteer that has worked in Floral
Park for a number of years. He has a prepared a list of priority items that the Arden
Hills/Shoreview Rotary Club can help achieve over these two years. The goals have been
outlined within the list in Attachment C and on the Floral Park Map shown in Attachment D.
An Adopt-A-Park sign would be placed at the entrances of Floral Park, similar to what is shown
in Attachment E examples, if Council so chooses to approve the resolution.
Attachments
Attachment A: Rotary Club Application
Attachment B: Resolution 2025-029
Attachment C: List of Volunteer Projects
Attachment D: Floral Park Maps
Attachment E: Adopt-A-Park Sign Examples
To view the final document, access adopted Resolutions via Arden Hills Public Laserfiche Weblink by visiting cityofardenhills.org and
clicking on Archived Documents under Helpful Links on our main webpage.
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 2025-029
A RESOLUTION ACCEPTING ADOPT-A-PARK APPLICATION
WHEREAS, Arden Hills (“City”) is authorized to allow volunteer term limits within a city
park and
WHEREAS, the following entity has offered to contribute volunteers set forth below to the
city:
Name of Volunteer Location Volunteer Term
Shoreview/Arden Hills Rotary Floral Park 2 Years- 2025/2026
WHEREAS, all such volunteers have been contributing to assist the City in the establishment
and operation of parks and programs either alone or in cooperation with others, as allowed by law; and
WHEREAS, the City Council finds that it is appropriate to accept the volunteer term offered.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF ARDEN HILLS, MINNESOTA, THAT:
1. The volunteer term described above is accepted and shall be used to establish cleaning
and general maintenance of natural resources, facilities either alone or in cooperation
with others, as allowed by law.
2. The City Clerk is hereby directed to issue a copy of the executed Resolution 2025-029
to the volunteer acknowledging the City’s receipt of the volunteer’s application and
volunteer waiver form.
3. That Public Works is directed to assist with providing appropriate hand-tools and
supplies to complete clean up tasks and maintenance as coordinated with the Public
Works Leadership Team.
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN
HILLS THIS 10TH DAY OF MARCH 2025.
_______________________________
David Grant, Mayor
ATTEST:
______________________________________
Julie Hanson, City Clerk
FLORAL PARK VOLUNTEER PROJECTS 2025
1
Floral Park Volunteer Projects 2025
Thursday, February 20, 2025
George Kruse
Dan Dietz
Spring
Clear gardens of winter vegetation. Take dead seed stalks to east Xcel easement. Best done prior to first
emersion of spring bulbs, or after bloom and flowers have dropped. We usually wait until after the
bloom of bulbs in G2 where most of the bulbs are planted to allow insects and small animals to continue
to winter under the leaf cover.
Burdock removal Project (late May):
• Dig up second year burdock. (This early in season too many, too small.) (gloves, spade)
• Pulling plants is best done in the spring when soil is moist.
• Plants can be thrown off trail to decompose.
Garlic Mustard Removal Project (late May?):
• Identify large plots, dig out and strain out roots. There are many such areas throughout the park
along trails.
• Tools: gloves, fork, four prong hoe, spade, paper grocery bag.
Garden #1 (dogwoods, sunflowers, Susan’s):
• Cut and remove dead plant stalks. Save dogwoods (3).
• Define natural garden border (currently 3- to 4-inch-wide shallow chip or mulch filled trench)
• Rake off leaves and take to compost pile.
• Tools: stiff rakes, loppers, cape cod weeder, hedge shears, four-pronged hoe, leaf blower,
canvass tarp.
Garden #2 (spring bulbs), early spring:
• Cut and remove dead plant stalks
• Rake off leaves. Be careful for spring plants.
• Define natural garden border (currently 3- to 4-inch-wide shallow chip or mulch filled trench)
• Clear/Clean butterfly pool. Rinse out pool a couple of times to get rid of old sediment and dead
algae. Rebuild sides of pool, if necessary, where rocks have fallen off. Bottom of pool should be
just one level of rocks.
• Turn over north end bulb garden, add compost and replant with large bulb plants like tulips, then
layer with medium sided and finally small (daffodils, Siberian iris, ???)
• Thin out blackeyed-susan’s and sunflowers.
• Tools: gloves, spade, rake, hand spade, lopper, shears.
Garden #3 (cup flowers), early spring:
• Cut and remove dead plant stalks
FLORAL PARK VOLUNTEER PROJECTS 2025
2
• Thin out Cup Flower plants
• Define natural garden border (currently 3- to 4-inch-wide shallow chip or mulch filled trench)
• Rake off leaves and take to compost pile.
• Tools: rake, lopper, hand lopper, spade , shears.
Garden #4 (milkweed and compost), spring/summer:
• Turn over compost (spade)
• Remove brush pile (lopper, saw)
• Pull/cut buckthorn saplings.
o Requires a sturdy lopper and/or the brush puller.
• Plant ferns
o Tools: rake and spade
Garden #5 (fern garden, early spring):
• Pull/cut buckthorn saplings.
• Crab apple tree. Inspect and trim if necessary. Area beneath tree should be clear and free of
buck thorn, burdock and wild raspberries. Trimming best done before last threat of frost to
minimize insect threat to new trimming wounds on tree.
o Tools: lopper and/or the brush puller, spade, ladder.
Garden #6 (Siberian Iris), early spring/summer:
• Clear off leaves. Take to compost pile.
• Define natural garden border (currently 3- to 4-inch-wide shallow chip or mulch filled trench)
• Plant more iris. Mulch and fertilize.
• Tools: sturdy rake, spade, edger.
Garden #7 (orange daylilies), spring/summer:
• Remove wild raspberries. Pull/cut.
o Tools: sturdy leather gloves, hand lopper.
• Mulch and fertilize
Garden #8: Clear more space for wild sunflowers.
Garden #9, Fern alley (daylilies and ferns):
• Clear and mulch around daylilies and ferns.
• Move large rocks back onto park land at beginning of ferns as landscaping feature (mound of
rock) (off new grass area). Rocks were moved from decorative position to off park land for park
renovation.
o Tools: small canvas tarp (to hold and drag stones)
Garden #10:
• Plant 6 native tall grasses (big and little bluestem, prairie dropseed, switchgrass) around sign.
o Three around each post.
o Tools: spade, gloves, mulch, fertilizer.
FLORAL PARK VOLUNTEER PROJECTS 2025
3
• Weed around daylilies
o where mulched, by steps and immediately under sign and down to Floral Drive curb.
o west of mulched area all the way to paved trailhead, along Floral Drive curb.
o Tools: gloves, hand lopper, lopper, hoe, spade
Garden #11: (proposed)
• Plant 7 native tall grasses (big and little bluestem, prairie dropseed, switchgrass) around new
tennis court portable bathroom. Four along backside parallel to Floral Drive, three along side
parallel to west side.
Summer (early)
Garlic Mustard Removal Project (park at-large):
• Pull plants carefully prior to setting seeds.
• Remove plants and dispose of in garbage. Once set, plant seeds will continue to mature after
plant itself dies.
• Tools: gloves, spade, fork, bags.
Summer
• Maintain gardens (mostly weeding out creeping Charlie) and garden borders.
Fall
Burdock Removal Project (park at-large)
• Pull large first year and second year burdock.
o Insert spade completely, vertically, as close to root as possible.
o Grab stalk against spade handle and lever back spade until you hear a “crack”.
• Object is to pull entire root, or at least ½ to 2/3 of root.
• Spray first year (small) burdock. Best done on humid mornings and turning over leaves to spray
undersides (pores open in mornings). Spraying must be done only by city workers!
• Tools: gloves, long sleeve shirt, spade, fork.
Bird Houses (19) (park at-large) – August to November:
• Clean – prior to freeze in order to wash and/or keep out mice by opening up.
• Tools: 3” scraper, large squirt bottle (ketchup or syrup), bucket of water, brush, bag (for debris),
spray disinfectant. Water, soap, bleach, and water tools are only needed if mice are found
nesting in the boxes. Please don’t mix bleach and soap!
Garlic Mustard Removal Project (park at-large):
• Pull plants carefully prior to setting seeds. Plant not toxic to skin.
• Remove plants and dispose of in garbage. Once set, plant seeds will continue to mature after
plant itself dies.
• Spraying - must be done only by city workers!
• Tools: gloves, spade, fork.
FLORAL PARK VOLUNTEER PROJECTS 2025
4
Trail maintenance –
• add chips to wet sections of trail,
• Trail widening by cutting brush to width of three feet,
• Pull brush and buckthorn using spade and brush puller.
• Tools: gloves, spade, fork, lopper, brush puller, tree girdling tool.
Winter
Wood duck nesting boxes (5) – November -January: Clean, repair, and re-chip. Box on Colleen/Hamline
Pond done best in January or early February while pond is frozen. Access is from Hamline or by pond
overflow egress. Home owner has granted access over his land from Colleen.
• Box #1: Bridge box
• Box #2: Swamp box Trailhead #3
• Box #3: Swamp box by Hamline Trail is serviced by Trista Yont.
• Box #4: Pond box in Colleen/Hamline Pond
• Box #5: Oak box hung in tree 10 yards to east of Trista’s box. Not currently serviced.
Buckthorn Removal Project (park at-large)
• seed collecting – pull seed pods off stalks into paper grocery bags.
• Buckthorn/brush cutting and removal best done during winter months due to spring wood ticks.
• After ground freezes, cut or girdle.
• Cut saplings and small trees using loppers and/or small chain saws two inches from ground level .
• Girdle large trees and return in early summer/fall to trim suckers. (Hachette, tree girdler)
• Treat stumps with herbicide or leave to trim suckers in spring. Plant will eventually die if root
stored energy is depleted over spring and summer and not renewed by suckers.
Trail maintenance (park at-large):
• Brush pile, tree and branch removal
• Buckthorn removal (invasive)
• Burdock removal (invasive): collect seed pods.
• Garlic Mustard removal (invasive)
• Repaint trailhead signs (yellow)
• Numbered trailheads from the south of the Woodland Trail starting with the
o South Trailhead off Floral Park Drive, TH #1;
o Bridge Trailhead, TH #2;
o Middle Trailhead, TH #3;
o Garden Trailhead behind garden #1, TH #4;
o Ballfield Trailhead, TH #5;
o Hamline Trailhead North, TH #6).
FLORAL PARK VOLUNTEER PROJECTS 2025
5
References:
Guide-to-forest-understory-revegetation-buckthorn-2024
7 Ways to Effectively Remove Buckthorn [Complete Guide]
Garlic mustard | UMN Extension
How to Get Rid of Buckthorn: the Best Buckthorn Removal Tips
Cleaning and Maintaining Wood Duck Boxes | Ducks Unlimited
Birdhouse Maintenance (Why, When, and How) - My Backyard Life