HomeMy WebLinkAbout01-28-25 Agenda Packet Chair:
Susan Johnson (2025)
Secretary:
Linda Hansohn (2026)
Board Members:
Gary Gerding (2025)
Kent Stennes (2026)
Melissa Jannakos (2027)
Joel Gerich (2027)
Andrew Elmquist (2027)
Staff Liaison:
David Swearingen
Karth Lake Improvement
District Board
REGULAR MEETING
Tuesday
January 28, 2025
1245 W. Highway 96
Arden Hills, MN 55112
651.792.7800
www.cityofardenhills.org
Agenda
Board Meeting Convenes at 6:30 PM
CALL TO ORDER/ROLL CALL
1. APPROVAL OF THE AGENDA
2. APPROVAL OF MINUTES of the previous meeting October 8,2024
3. PUBLIC INQUIRIES
4. OLD BUSINESS
4.1. Lakeshore owner outreach and education. Kent Stennes
4.1.1. Background: The KLIDB has reached out to KLID members in the past with flyers, events and door-knocking to
increase awareness of what the KLIDB does, provide information to assist members in managing their shoreline and
to recruit new board members. The Board agreed to consider another Ice Cream Social for Summer 2025.
4.1.2. Action: Consider sending out educational information and let folks know who to contact if they see something that
shouldn’t happen and what things are good for them to do to and plan for outreach to new residents.
4.2. Karth Lake water level modeling and management process progress report. Renée Marino
4.2.1. Background: Hypothesis: a revision to the pump management policy can reduce water level bounce (i.e., range of
high and low levels), which can improve lake quality and its environment while appropriately mitigating risk of
damage to shoreline properties. Renee made a detailed presentation in October and a subcommittee was going to
work with David to decide next steps.
4.2.2. Action: Discussion of subcommittee recommendations.
4.3. Bylaws review and possible modification. Susan Johnson
4.3.1. Background: Discussion of possible changes and clarifications to the KLIDB bylaws.
4.3.2. Action: Discuss the possibility of a change to the bylaws that has the City Council make appointments to the Board
rather than an election. The elections have had little to no participation and seem like a waste of resources. The City
Council already makes appointments to other commissions so it seems like this might be a reasonable change.
4.4. 4.4. Possibility of initiating a new study to identify status and refresh list of BMPs for future management of Karth
Lake. David Swearingen
4.4.1. Background: The most recent Karth Lake study and BMP identification was performed by the Rice Creek
Watershed District in 2009. The board would like to identify a plan for a follow-up assessment of Karth Lake’s
current health and opportunities for improvement (BMPs). In April 2023, David Swearingen had described possible
grant opportunities that the City of Arden Hills could pursue.
4.4.2. Action: The plan is still set for phase 2 of BMP #1 to be done in the 2026 PMP project. This project will also
include replacing the retaining wall in Cummings Park. A consultant will be brought on board in February 2025 to
help design the solution and look into grants that are available as well as look at other improvements that will help
the lake water quality. Any updates?
5. NEW BUSINESS
5.1. Status of log removal by DNR gauge
5.1.1. Background: There are some logs by the DNR gauge in the lake that have moved the gauge and need to be
removed.
Karth Lake Improvement District Board
October 8, 2024 Page 2
5.1.2. Action: Can David put removing those logs on the Spring agenda? The DNR cannot straighten the gauge until those
logs are removed.
5.2. Water quality monitoring for Karth Lake for 2024. Gary Gerding
5.2.1. Background: The KLIDB has participated in the Citizen-Assisted Monitoring Program (CAMP) with the
Metropolitan Council by coordinating volunteer sampling of Karth Lake’s water quality since 2006.
5.2.2. Action: Provide any updates for 2024 sampling program.
5.3. Water quality and impact of feeding migratory water fowl
5.3.1. Background: Some people have been feeding geese and crows and this has been impacted water quality in the lake.
5.3.2. Action: Discuss possible solutions
6. NEXT MEETING
7. ADJOURN
Draft Minutes for Karth Lake Improvement District Board
Regular Meeting 6:30 PM, Tuesday, October 8, 2024
CALL TO ORDER/ROLL CALL
The meeting convened at: 6:30 PM.
Present:
Board Members: Susan Johnson, Chair, Linda Hansohn, Secretary; Kent
Stennes; Gary Gerding; Andrew Elmquist; Joel Gerich;
Staff Liaison: David Swearingen, Public Works Director
Visitors and Karth Lake Improvement District members: Renee Marino, Jim
Elliot
Absent:
Melissa Jannakos
1. APPROVAL OF AGENDA: The agenda was approved with the addition of New
Business 5.3 to discuss possible impact of a proposed school rezoning near
Cummings Park.
2. APPROVAL OF MINUTES: The minutes of the previous meeting on June 6, 2024
were approved with no changes
3. PUBLIC INQUIRIES: None.
4. OLD BUSINESS
4.1. Lakeshore owner outreach and education. Kent Stennes.
4.1.1. Background: The KLIDB has reached out to KLID members in the past
with flyers, events and door-knocking to increase awareness of what the
KLIDB does, provide information to assist members in managing their
shoreline and to recruit new board members. Several lakeshore properties
have or are soon expected to have new owners that have not benefited from
past communications and an update on the lake’s current status to continuing
owners would be helpful.
4.1.2. Discussion: Discussion of the Cummings Park Ice Cream Social and if
this is something we would want to repeat in the future. Decided to consider
it next Spring and if we do have it, perhaps make it earlier in the summer.
4.2. Karth Lake water level modeling and management process progress report.
Renée Marino
4.2.1. Background: Hypothesis: a revision to the pump management policy can
reduce water level bounce (i.e., range of high and low levels), which can
improve lake quality and its environment while appropriately mitigating risk
of damage to shoreline properties.
4.2.2. Discussion: Renée reviewed the hydrology model with Matt Kocian
(RCWD) and Bret Zimmerman (Houston Engineering) and gave a detailed
presentation discussing the conclusions and possible ways to use this
information. The presentation document is included separately in the packet.
Renee has spent 3 years working on this project. An interesting observation
was made that if Karth Lake was not pumped in the past and going forward,
the water level would go above Amble Drive. Since 1980, there has been 30
feet of water pumped out of Karth Lake. In other words, this is not strictly a
problem of the people who live on the lake, it is the entire watershed. This
really needs to be shared with the City Council.
4.2.3. Action: The report includes multiple pumping strategies and a small group
has been assigned the task of reviewing the strategies with David
Swearington to come up with a recommendation to present to City Council.
The members of the Small Group are Joel Gerich and Kent Stennes.
4.3. Summary of Weed Removal project. Susan Johnson
4.3.1. Background: Lake weed removal was done this summer. This is an
annual activity to help reduce the weed level in the lake. It is voluntary for
homeowners to sign up for this service.
4.3.2. Discussion: Susan presented the results of the project. The lowest number
of residents participated this year, There were only 18 households. The cost
was almost $3000 more than the previous year ($9825 for 131 hours of
labor). She was able to get the bill reduced but contributions were not
enough and the extra funds came from the Arden Hills Foundation money
that was available. If we do this project next year, there needs to be a
minimum contribution for each household that participates. The final stats
were 2.34 hours/bag at $175/bag. There was a total of 56 bags collected.
4.4. Bylaws review and possible modification. Susan Johnson
4.4.1. Background: A preliminary review of the bylaws causes there to be
questions regarding who is a member of KLID, how elections should be run
going forward, and who can vote
4.4.2. Discussion: Composition of the board is unclear as well as terms of office,
Susan wrote a draft update to the bylaws and would need to send to the city
attorney for review and then approved by the city council. The proposed
bylaws indicate that there should be 1 ballot per parcel in the Karth Lake
district and only 1 person per parcel to serve on the board. The city will mail
out ballots to each property at least 2 weeks before the 2nd Tuesday in April
which is the annual date for the election meeting. An observation that Susan
made was that the City Council could just appoint members and not have an
election. The Board approved a motion to go over the changes with the City
Attorney.
4.5. Possibility of initiating a new study to identify status and refresh list of
BMPs for future management of Karth Lake. Joel Gerich and David
Swearingen (change title to reflect work that will be part of PMP for 2026)
4.5.1. Background: The most recent Karth Lake study and BMP identification
was performed by the Rice Creek Watershed District in 2009. The board
would like to identify a plan for a follow-up assessment of Karth Lake’s
current health and opportunities for improvement (BMPs). In April 2023,
David Swearingen had described possible grant opportunities that the City of
Arden Hills could pursue.
4.5.2. Discussion: The plan is still set for phase 2 of BMP #1 to be done in the
2026 PMP project. This project will also include replacing the retaining wall
in Cummings Park. A consultant will be brought on board in February 2025
to help design the solution and look into grants that are available as well as
look at other improvements that will help the lake water quality.
5. NEW BUSINESS
5.1. Conversation with DNR regarding Purple Loosestrife. Susan Johnson
5.1.1. Background: Approximately 20 purple loosestrife plants have been
identified in Karth lake. They are all in the water so we need DNR approval
to remove the plants
5.1.2. Action: Susan talked to the DNR about this situation and got permission
to remove any purple loosestrife in the lake
5.2. Water quality monitoring for Karth Lake for 2024. Gary Gerding
5.2.1. Background: The KLIDB has participated in the Citizen-Assisted
Monitoring Program (CAMP) with the Metropolitan Council by
coordinating volunteer sampling of Karth Lake’s water quality since 2006.
5.2.2. Action: All of the data will be available electronically just prior to the
April Board meeting. This year there was very low seque depth.
5.3. Proposed school site near Cummings park
5.3.1. Background: Linda received an email detailing plans for a school to
move into the old Fair Isaac location. There were lots of details about the
plan but the actual formal application request has not been completed
5.3.2. Action: Wait until the formal application has been submitted and tell City
Council that we would like to be involved in any discussions of changes that
could potentially impact the lake.
6. NEXT MEETING: Tuesday, Jan 14 2025, at 6:30 PM at City Hall.
7. ADJOURN
Karth Lake Pumping Strategy
Assessment Tool
Results as of 10/8/2024
Prepared by Renee Marino via expansion of a model prepared by Houston Engineering under Matt Kocian,
Rice Creek Watershed District’s, funding and oversight
Conclusions of review on 9/30/2024: “The spreadsheet model is an acceptable tool for looking at various
pumping strategies and lake level response.” –Bret Zimmerman, PE (Licensed in MN, ND), Civil Engineer |
Principal, Houston Engineering, Inc.
Purpose
•Use the Karth Lake Hydrology Model to consider the benefits and risks of the current and alternative pumping strategies
•The current pumping strategy incorporated into the 2003 DNR Permit consists of:
•Before October 1, begin pumping when Karth Lake’s elevation reaches 936 elevation (feet above sea level) and continue pumping until the elevation is 934 feet (“936=>934”)
•Starting October 1, begin at 935 and pump to 934 (“935=>934”)
Note: The URS hydrology study presented by the City of Arden Hills to the DNR in support of the 2003 permit is ambiguous as to whether these elevations use the 1929 standard (NGVD29) or the 1988 standard (NAVD88). NAVD88 = NGVD29 + 0.16. This model assumes that the permit is stated in NGVD29 elevations.
Background –1848 and 1989 surveys had no Karth Lake. By 1867 and
1874, “Ryan’s Lake” appeared in various shapes. It is land-locked with
no outflow. Its appearance may be due to roads blocking the former
flow north into Marsden Lake and ultimately Rice Creek.
The pond at Hwy 96 and Lexington has existed throughout, but is bisected today by Hwy96.
1848 1859
1867 1874
Karth Lake’s level history demonstrates a 5 foot bounce:
from 933 to 938. A 3 foot bounce within a few year
period is more typical.
•Karth Lake’s level before development was
below 930.
•Housing developments in the late 1970s to
early 1980s added impervious pavement and
a street sewer system that transported water
from greater distances through pipes directly
into the lake. This increased the watershed
area and moved more water directly into the
lake that would have previously been partially
absorbed by soils.
•Subsequent development of commercial
impervious areas and the Shoreview
townhouse development in the late 1990s
have added to the impervious surfaces that
drain directly into the lake.
Karth Lake’s surrounding
elevations are shown in this
2022 Lidar map overlaying a
satellite map. Finer detail is
available online. Key points:
•The lowest lying houses on
the northeast side of the
lake begin just above 942
•Amble Drive varies from
946 to 960
•Houses on the southwest
side of the lake begin at
960
•If Karth Lake were at the
elevation of 960, parts of
Lexington Avenue and
Highway 96 would be
underwater
Using RCWD’s
watershed map
superimposed on
the 2022 Lidar map:
The sum of the area
in the blue squares
on the 2022 Lidar
map with the
watershed map
overlay results in a
estimate of 142.9
acres, which
matches the RCWD
watershed estimate.
Karth Lake’s watershed per
Rice Creek Watershed is
142.9 acres, confirmed by this
mapping estimate:
Superimposing an
earlier watershed
(see inset) that
must have been
from just prior to the
housing
development shows
the growth due to
development.
This implies a
watershed of about
40.9 acres.
The current
watershed of 142.9
acres is 250% larger
than this original.
The sum of the blue
and green squares
(streets, parking
lots, etc.) is 25 to 28
acres.
The lower number
assumes that the
five green
highlighted squares
do not drain directly
into the lake.
The best fit
hydrology model
implies impervious
of 25 acres so
agrees to this
smaller estimate.
Estimating impervious
acreage:
Hydrology Model Results – 2024
The hydrology model developed by Houston Engineering and extended to full year daily projections by RMarino provides a very good fit to 2024 data.
Inputs:
•Daily local rain from MNClimate
•Evaporation from the UofM St. Paul campus
•Topography from MN State 2022 Lidar data and Kathy Johnson’s fish finder depths
•Pumping rate from specs and fit to first 11 days of 2024 pumping results (235 gallons/ minute)
•Actual lake levels from DNR gauge monitoring program
Hydrology Model Results – 2022-2023
The hydrology model performs well through mid-
August but over-predicts later lake levels for 2022-
2023.
This may be due to drought conditions. Recent
studies of Turtle Lake and others report that low
ground water tables can create a “negative vortex”
where water is depleted through springs.
While springs do not appear to be a source of
water for Karth Lake, they could reduce water
levels during extreme drought.
Rain’s Effect
A single day’s rain increases lake levels by:
1.The inches of rain that fall directly on the lake (this chart for when the lake is 19.5 acres)
2.The rain that runs through the storm sewer system into the lake from 25 acres of impermeable surfaces
3.Run-off from other surfaces in the watershed. For a daily rain in isolation, the first 2.25 inches of rain will be absorbed, then start to run off into the lake. For multiple days of rain, the wetter soil causes a single day’s run-off to begin sooner.
=> It would take an impervious area of under 5 acres to
achieve a stable lake level. Typical factors are:
•annual evaporation of 32 inches
•annual rain of 26 inches (assume daily rain < 2.25 inches, so
no run-off)
•the beginning and ending lake level would be the same if the
impervious area is about 5 acres
•Since Karth Lake has 25 impervious acres, pumping is
necessary to prevent long term rises in lake levels.
Historical daily rain data used in model
•Average annual rainfall:
•1961 to 1975 = 20”
•1977 to 2023 = 24”
•Min 1976 < 9”
•Max 2002 = 35”
•Max single day rains: 1965 (5.2”), 1987
(5.5”), 1997 (5.0”) and 2011 (5.5”)
•1997 (striped bar) => most challenging
year for all pumping scenarios because
of the pattern of rain (dry then many
days of rain).
•Climate change impact: more intense
storms, higher maximum daily rains,
deeper droughts
•Annual rains to 36” (20% over 2024 YTD)
•Max daily rain up to 7.0”
Snow’s Effect?
•Hydrology Model covers May through October.
•Snow (Winter) can impact November – April
levels, which are not modeled.
•Lake levels between 10/31 and 5/1 have
historically risen or fallen. Turtle and Snail
winter changes were considered for use as a
proxy, but rejected because of their active
pumping programs and different
circumstances.
•Instead, we are assuming no change in Karth
Lake’s level from 10/31 to 5/1.
•At the same time, the carryover from the prior
year’s ending level does impact the
assessment of pumping strategies.
Key attributes to consider from a pumping
strategy are:
•Max: Likelihood (risks) of extreme high water levels to buildings, docks, trees, erosion
and increased runoff of silt.
•Min: Likelihood (risks) of extreme low water levels: increase algae, lake weeds, winter
oxygen depletion and fish kills, sandy edge expanding invasive plant growth (purple
loosestrife), bacteria blooms unsafe for swimming and general loss of recreational
value.
•Bounce: Difference between max-min levels within a year
•General lake levels: Median, inner quartile range (between 3rd and 1st quartile levels)
•Implementation: Expected years with pumping, days within a year and number of
on/offs affect staff time and pump wear and tear
Pumping strategies considered so far:
•DNR: 936=>934 through September, then 935=>934 (October and
November)
•Alt0: 936=>934
•Alt1: 936=>935
•Alt2: 936=>935.5
•Alt3: 935=>934.5
•Alt4: 935.5=>934.5 though August, then 935=>934.5
•Alt5: 935.5=>934.5
Effects of Pumping
•The six pumping strategies
considered here materially
affect the expected outcome.
•While the difference between
each pumping strategy will be
the focus of the remaining
analysis, it is important to
appreciate how important
pumping is to maintaining the
current character of Karth Lake.
Min/Max for all pumping strategies
•All experience their maximum level in
1997 of 937.2 to 938.1. An abrupt
pattern of several days of heavy July
rain after a dry May and June causes
all strategies to start pumping on the
same day and continue pumping for
nearly three months.
•All pumping strategies experience
their minimum levels in 1976 and
1977 of 931.4 to 932.6.
•The DNR policy performs worse with
the lowest minimums in 1976-1977,
2007-2009 and 2023. In 1987-1990,
other policies perform worse than the
DNR policy.
Single year bounce (max-min levels) for
multiple pumping strategies
•The highest single year
bounces occur with the
DNR policy and the related
Alt0:936=>934 all year (red
and dark green in this
chart)
Summary Statistics
•Goal: minimize bounce and risk of extreme high waters while keeping lake levels generally above sandy shoreline at 934
•All alternative strategies reduce the bounce compared to DNR and Alt0
•Alt2:
•minimizes bounce and pumping needs and allows a higher average lake level
•but has the highest max level in the single year 1997 of these 63 modeled years
•Alt3 has a similar low bounce but has more sandier shores with the lowest average and max levels
•Alt4 is more of a middle ground with lowest max level and slightly higher bounce
For Years 1961-2023 For Years
Beginning Levels Based Upon Prior Year Average of Annual Statistics Pumped,
without Turtle/Snail Lake's Snow Effect
Min Level Elev Q1
Elev Q2
(Median)Elev Q3 Q3-Q2
Max
Level
Avg 1 Yr
Bounce
Max 1 Yr
Bounce
Max 5 Yr
Bounce
Years
Pumped
Days
Pumped
Avg Days
Pumped
DNR (936=>934 thru Sept,then 935=>934)931.4 934.3 934.6 935.0 0.7 937.2 1.8 3.2 5.0 47 1,841 39
Alt0 (936=>934)931.4 934.3 934.7 935.2 0.9 938.1 2.0 4.1 5.0 39 1,829 47
Alt1 (936=>935)932.2 934.9 935.2 935.5 0.5 937.7 1.5 2.9 4.7 47 1,770 38
Alt2 (936=>935.5)932.6 935.2 935.4 935.6 0.5 938.1 1.3 2.7 4.5 52 1,767 34
Alt3 (935=>934.5)931.7 934.2 934.4 934.7 0.4 937.2 1.3 2.8 4.9 54 1,844 34
Alt4 (935.5=>934.5 thru Aug,then 935=>934.5)931.9 934.3 934.6 934.8 0.5 937.2 1.4 2.9 4.8 53 1,832 35
Alt5 (935.5=>934.5)931.8 934.4 934.7 935.0 0.6 937.3 1.5 2.9 4.8 47 1,811 39
Minimum
Maximum
Comparing Alt2 to Alt4 Strategies: Levels
•As shown, Alt2’s min and
max lake levels are higher
than Alt4’s in all years.
•Their median levels, from
the prior table are 935.4
(Alt2) versus 934.6 (Alt4)
Comparing Alt2 to Alt4 Strategies: Bounce
Comparing the
bounce of these
strategies as a
function of total
rain, Alt2 (the green
dots) are nearly
always lower than
Alt4.
Comparing Alt2 to Alt4 Strategies: Pumping
For the most part,
pumping occurs in the
same years for Alt2 and
Alt4
Next Steps
•RCWD has a defined but more limited part of the process going forward
•Karth Lake Improvement District board/members to evaluate and
recommend any pumping strategy changes to the City of Arden Hills
•The City of Arden Hills to address implementation issues
•The City of Arden Hills has the responsibility to choose which, if any,
revisions to the DNR strategy to adopt
•If the strategy changes, the City of Arden Hills will need to with a request
that the DNR modify the 2003 permit. Houston’s involvement and review
can be a part of the evidence presented to the DNR.