HomeMy WebLinkAboutCC 05-20-1991
MINUl'ES OF 'IRE ARDEN HILlS CITY COUNCIL mRKSESSION MEEl'ING
M:lNDAY, MAY 20, 4:30 P.M. - CITY HALL
.
Pursuant to due call and notice thereof, Mayor Sather
called the meeting to order at 4:30 p.m.
ROLL CALL The roll being called the following members were present:
Mayor Thomas Sather, Council1nembers Nancy Hansen, Paul
Malone, JaAnn Growe and Thomas Mahowald. Also present: Engineer Terry Maurer,
Public Works Superinterrlent Dan Winkel, Parks Director John Buckley, Clerk
Administrator Gary Berger and Deputy Clerk Catherine Iage.
CALL 'ID ORDER
AOOPr
AGENDA
Malone moved, seconded by Growe, to adopt the 5-20-91
Ageroa as subnitted. Motion carried unanim::Jusly. (5-0)
Engineer Maurer distriJ:uted information relative to the
traffic COI.U1t on North Snelling Avenue. He explained the
traffic COI.U1t infonnation compares with MN/oor figures
and the data supports the design of the road; the road is
designated as a "low density =llector".
DISCUSSION; NORm
SNELLING AVENUE
IMPROVEMENT
.
Maurer reviewed the design alternatives relating to the proposed width of the
road. He indicated that a 32 ft. road would not allow parking on either side of
the roadway and a 36 ft. road would allow parking on one side of the roadway.
Maurer also discussed the installation of detached pathways and explained that a
5 ft. wide detached pathway may be eligible for MSA furrling. It was noted that
the recently adopted assessllEI1t policy requires sidewalks/pathways be assessed to
benefitted properties at 100 percent of the costs.
The Engineer strongly supported the 36 ft. wide roadway to maintain parking
options; advised the additional width has no significant impact on the project
and protects future parking options.
Council discussed the =sts and proposed location of a detached pathway;
expressed support for the installation of a pathway on one or both sides of the
street =nditioned upon favorable input from residents and cost factors. Cotmail
discussed possible inclusion of the proposed pathway on the parks trail system.
There was discussion relative to parallel versus angle parking in the area of
Royal Hills park. The Engineer and Cotmail =ncurred that angle parking =eates a
safety hazard and parallel parking would be preferable.
Councilmember Mahowald suggested a neighbortlood meeting be scheduled to discuss
the roadway design, detached pathway and other issues with residents.
Engineer Maurer proposed the meeting be held on Snelling and offered to walk
the street to show residents how the project affects their property. He stated
this awroach has worked well in other canmunities.
Residents in attendance at the meeting expressed interest in holding a
neighborhood meeting as outlined.
The Clerk Administrator reported the Ramsey County Sheriff's Deparbnent advised
there have been no significant traffic violations on North Snelling Avenue.
.
Minutes of the Arden Hills Council Worksession, 5-20-91
Page 2
.
SNELLING (Cent 'd) Malone JOOVed, seconded by GrCMe, to schedule a meeting
with residents of North Snelling Avenue on lliursday, May
30, 1991, at 6:30 p.m., at City Hall and a field review of North Snelling at 7:15
p.m., and to direct staff as follows:
1. City Engineer to prepare information regarding cost f= a detached pathway on
one = both sides of the street, proposed parallel parking, and be prepared to
review the assessment policy and improvement information with individual property
~ at the field review portion of the meeting.
2. City staff to prepare a notice f= property ~ on North Snelling Avenue
which outlines the date, time, location and purpose of the meeting.
Motion ca=ied unanimously. (5-0)
Engineer Maurer requested questions which relate to a specific parcel of land be
referred or forwarded to his attention prior to the meeting.
Council was referred to a memorandum fram the Clerk
Administrator dated 5-17-91, and attachments, relating to
the Cleveland Avenue inprovernent.
Council referred to the April 23 letter from NSP relating to the costs for
electric service installation and questioned if the full arrount f= installation
may be included in the asc<:>ssment.
DISC;CLE\/EIAND
AVENUE IMPOOVEMENI'
.
Engineer Maurer stated the Refundable Agreement outlined in the letter does not
guarantee the re:imbursement of funds and the city may include the full cost of
installation in the assessment.
Councilmember Malone suggested an awraisal of all property al:utting Cleveland
Avenue be obtained, rather than just one parcel.
Malone moved, seconded by Hansen, to direct the Clerk
Administrator to obtain appraisals f= all properties al:utting Cleveland Avenue,
direct the Engineer to detennine final costs for the project and prepare a report
for Council review at a furore meeting. Motion ca=ied unanimously. (5-0)
TRAFFIC PROBLEMS;
HAMLINE AVENUE &
COUNTY ROAD F
Council was referred to a memorandum fram the Clerk
Administrator dated 5-17-91, and attachments, relating to
traffic problems at Hamline Avenue and County Road F.
.
Engineer Maurer advised a study was CCIIpleted in 1990 relating to the traffic
situation and it was determined that a signal is warranted at this intersection.
He explained that the City should first detennine the area of auth=ity of
MN/oor, as relates to this intersection. Maurer stated if MN/oor has jurisdiction
for signalization, the city would suhnit a request to include the project into
the MN/oor long-range plan.
Maurer stated he will contact the state Traffic Engineer regarding this matter
and report to Council at a future meeting. He noted the project should be
eligible f= state Aid funding.
Minutes of the Arden Hills Council Worksession, 5-20-91
Page 3
.
SCHEDULE PUBLIC
HEARING; CHA'IHAM
CIRCLE & CDURI'
Mahowald moved, secorrled by Hansen, to schedule a Public
Hearing to consider the proposed assessment for the
improvement of Chatham Circle and Chatham Court by
bituminous overlay, on Monday, June 10, 1991, at 7:30
Motion ca=ied unanimously. (5-0)
Malone moved, secorrled by GrCMe, to schedule a Public
Hearing to consider the Vacation of Drainage and utility
Easements located on IDts 1 and 2, Block 1, Northwoods
Mdition, 3900 Northwoods Drive, on Monday, June 10,
1991, at 8:00 p.m., at City Hall. Motion ca=ied
unanimously. (5-0)
p.m., at City Hall.
SCHEDULE PUBLIC
HEARING; VACATION
OF EASEMENI'S,~
HEALTH, NORl'ID'KlODS
REPORl'; PARKING
ON lAKE JOHANNA
OOULE.VARD
Council was referred to a report fram the Public W=ks
SUperintendent dated 5-17-91, relative to parking on
lake Johanna Boulevard.
.
winkel reviewed the Safety/Works Committee discussion and recommendation that no
variances or permits be issued f= parking on lake Johanna Boulevard. The
Committee suggested the resident experiencing the parking problems pursue the
offer fram neighbors to park a vehicle on their property.
llie Clerk Administrator reported he contacted Commander Bergeron to discuss the
parking situation; Bergeron stated if the city directs the County not to issue
citations f= parking, County Deputies will CCIIply with the =der. He further
advised that Commander Bergeron expressed concern that residents in other areas
of the City may also request to park on the street and a precedent would be
established.
Council concurred to discuss this matter upon receipt of a recommendation fram
the Planning Commission.
amER BUSINESS
MAIIBOX
DAMAGE
Councilmember Malone requested a report on the damaged
mailbox fram the Public Works SUperintendent.
Winkel distriJ:uted photographs of the mailbox in question and reported it does
not a];pear that the snowplow damaged the mailbox. He also noted the mailbox was
inaw:rupLiately installed; displayed diagrams of proper installation, as required
by the Post Office. Winkel reviewed City policy relating to damage to mailboxes
and suggested the homeowner be forwarded a copy of the proper installation
diagram.
.
lliere was discussion relative to the extent of city responsibility f=
replacement of the mailbox. llie Public Works SUperintendent expressed concern
that a precedent may be set if the City purchases a replacement mailbox, even
though the City staff did not damage the mailbox.
After discussion, Council concurred that city staff be instructed to install a
replacement mailbox for the property owner as required by the Post Office, and
the Public Works SUperintendent be directed to advise the property owner of their
responsibility to purchase the replacement mailbox. Council further advised that
if the property owner refuses to purchase the replacement mailbox, this matter is
deemed resolved and the property owner accepts full responsibility for installing
and purchasing the mailbox.
, .
.
.
.
Minutes of the Arden Hills Council Worksession, 5-20-91
Page 4
DISCUSSION;
KEI'IHSON POND
CITY pm FOND
CITY LOGO
DISCUSSION ;
PUBLIC NOrICE
SNELLING AVE.
ADJOURN
~ f3~/I
Gary R. er
Clerk Administrat=
Council discussed the status of pumping the Keithson pond
and Public Works SUperintendent Winkel rep=ted on the
condition of the street.
Council diSC"lSs-,d status of the 1991 pm fund.
Councilmember Malone reported on the progress of the new
City logo.
Councilmember Mahowald expressed dissatisfaction with
the wording of the notice sent to residents in the
area adjacent to Snelling Avenue regarding the
reconsideration of the street inprovernent.
Moved by Malone, secorrled by Mahowald, to adjourn the
meeting at 6:30 p.m. Motion ca=ied unanimously. (5-0)
tL~ fM-
ThamasR.Satlier
Mayor