HomeMy WebLinkAboutCC 02-01-1982
,
Minutes of Special Council Meeting
Village of Arden Hills
Monday, February 1, 1982 - 7: 30 p.m.
Village Hall
Call to Order
Pursuant to due call and notice thereof, Mayor Woodburn called
the meeting to order at 7:30 p.m.
.
Roll Call
Present - Mayor Robert Woodburn, Councilmen Janet Hollenhorst,
Diane McAllister, Maurice Johnson
Abaent - None
Also Present - Village Engineer Don~ld Christoffersen, Treasurer
Donald Lamb, Clerk Administrator Charlotte McNiesh,
Deputy Clerk Dorothy Zehm.
Approval of Minutes
McAllister moved, seconded by Johnson, that the minutes of the
January 11th Council Meeting be approved as amended. Motion
carried unanimously (4-0).
Business from the Floor
None
Rice Creek Watershed District - Board of Managers
In discussion relative to the Council's concerns about the poten-
tial flooding of the City's sanitary sewer system, resulting from
the construction of various control structures constructed by
Rice Creek Watershed District in the Ramsey County Open Space
north of Lake Johanna, Weidenbacher said that the most heavily
impacted area is between the Soo Line and County Rd. E2; noted
that there was a 1.5' freeboard before the structures were in-
stalled.
Weidenbacher acknowledged Mr. Dimke's verbal statement that RCWD
would raiae the affected manholes; noted that the Johanna outlet
is still the problem - RCWD had wanted the lake level at a one
foot lower elevation.
It was noted that Village Engineer Christoffersen and Public Works
Supervisor Johansen expressed their concerns relative to the flood-
of the lift station and sanitary sewer lines prior to construction
of the Lake Johanna outlet.
Weidenbachen said the only feasible options are to rsise the 12
manholes and to fill around them, or install watertight manhole
covers, cost to raise the 12 manholes and fill around them at a
4 to 1 slope was estimated at about $11,000; cost of 12 water-
tight manholes was estimated at $4200.
.
Christoffersen suggested that the seal-type manhole lid would be
preferable; agreed that maintenance of the raised manholes would
be difficult, if not impossible.
The Board of Managers agreed to install the 12 watertight man-
holes in this area. Council concurred that this seems to be a
logical solution of the problem; would like input of Johansen and
Christoffersen re this solution.
Public Hearing: (8:30 p.m.)
Improvement No. SS-W-P-ST 81-5, RO.llll lIill_~
Mayor Woodburn opened the Public Hearing at 8:30 p.m. and Clerk
Adminietrator McNiesh verified publication of the Notice of Hear-
ing in the New Brighton Bulletin on January 21st and 28th, and
that notices were mailed to affected property owners on 1-20-82.
(See attached Minutes of Public Hearing)
.
Minutes of Special Council Meeting
February 1, 1982
Mayor Woodburn closed the Public Hearing at 10:15p.m.
After the public hearing was closed, and discussion by the Council,
developer Marcel Eibensteiner requested that Council action on the
proposed plat be tabled until the next Council meeting, affording
Council and himself time to consider the feasibility report and
tonight's discussion.
McAllister moved that Council table its action on the Preliminary
Plat of Royal Hills until the February 8th Council meeting.
Motion was seconded by Hollenhorst and carried unanimously (4-0).
REPORT OF VILLAGE ENGINEER DONALD CHRISTOFFERSEN
Approval of Ramsey County County Road E 'Median Plans
.
Christoffersen referred Council to County Road E median plans; re-
ported that the only change, since Council's approval of the plans,
is the addition of a replacement catch basin at Lindey's corner.
Hollenhorst moved, seconded by McAllister, that Council authorize
execution of the Ramsey County Median plans for County Road E by
the Mayor. Motion carried unanimously (4-0).
Approval of Traffic Control System - Lexington/694 Ramps
Council was referred to plans for the Lexington Ave./694 ramps
traffic control system.
After discussion, McAllister moved, seconded by Hollenhorst, that
Council approve the traffic control system plans (Lexington/694
ramps) and authorize execution thereof by the Mayor. Motion
carried unanimously (4-0).
Status Report on Cable Television - William Baue~
Bauer reported that each municipality in the North Suburban Cable
Commission is required to hold a Public Hearing, prior to the
joint Public Hearing on March 25th and before the consultant's
final report scheduled on March 10th.
Hollenhorst moved, seconded by Johnson, that Council schedule the
Arden Hills Cable Television Public Hearing on February 22nd at
8:45 p.m. at the Village Hall. Motion carried unanimously (4-0).
Bauer noted that franchise applicants will probably attend to
answer questions; will each make a full presentation at the March
25th joint hearing.
Bauer reviewed the Cable Television Calendar:
Ap ril 1
Public Hearing on CATV in Arden Hills
Arden Hills Citizen Advisory Committee Meeting
NSCC Regular Meeting
-Review final voting procedure
-Discuss joint power administration
agreement?
Consultant Issues Final Report
NSCC Regular Meeting
-Major "Show and Tell" Public Hearing
-All Councils invited
-All applicants will give presentations
NSCC Meeting
-Vote to select proposed ~ranchisee
.
Feb ruary 22
February 23
February 25
March 10
March 25
Bauer referred Council to proposed draft of Joint Powers Agree-
ment for Council's review; suggested that any changes thereto
ahould be made as soon as poasible.
REPORT OF VILLAGE TREASURER DONALD LAMB
Investments
January 20th - $380,000 at Twin City Federal for 120 days,
maturing 5-20-82, at 13.55% interest.
-2-
. Minutes of Special Council Meeting
February 1, 1982
, January 28th - $100,000 at Oak Park Heights for 6 months,
maturing 7-28-82 at 14.75% interest.
Johnson moved, seconded by Hollenhorst, that Council ratify the
Treasurer's investments. Motion carried unanimously (4-0).
OTHER BUSINESS
Public Safety Committee Recommendation - Stop or Yield Sign at
Edgewater/Prior Avenues
Johnson reported that the Public Safety Committee recommends
denial of the request.
.
McAllister moved, seconded by Johnson, that Council deny the re-
quest for a "stop" or "yield" sign at the Edgewater/Prior Avenue
intersection at this time based on the Public Safety Committee's
recommendation that it is not warranted for traffic volume or
safety reasons. Motion carried unanimously (4-0).
Committee Appointments
Upon recommendation of Council members Johnson and McAllister,
Mayor Woodburn appointed Don Halva as a member of the Board of
Appeals for 1982.
Johnson moved, seconded by Hollenhorst, that Council ratify the
Mayor'e appointment. Motion carried unanimously (4-0).
Other potential committee members who have volunteered or been
recommended for appointment will be contacted by Mayor Woodburn.
Resignation - Finance Committee
Council was referred to letter of resignation from the Finance
Committee from Frank Hlavka.
McAllister moved, seconded by Hollenhorst, that Council accept
with regrets Frank Hlavka's resignation. Motion carried unani-
mously (4-0).
RecyclinK Unlimited Request for Drop-off Facilities
Council was referred to McNiesh's memo of 1-29-82. After dis-
cussion, in which some concern was expressed relative to appropri-
ate zoning, possible "litter" problems, and need for facility,
matter wae deferred.
Request for Time Extension for Payment of Park Dedication -
Janet Estates
It was noted that Council previously granted an extension to
December 1981 for payment of the Jsnet Estates park dedication,
and granted an extension for filing the amended plat of Janet
Estates to June 8, 1982.
McNiesh explained that the initial request for extension for pay-
ment of the park dedication was to June of 1982 (Council granted
the extension to December 1981).
.
After discussion, Johnson moved, seconded by Hollenhorst, that
Council require payment of 50% of the balance due of park dedica-
tion now, and approve extension of payment of the other 50% to
June 8,1982, with interest at 14% annual rate. Motion carried
unanimously (4-0).
~blic Works Supervisor Johnansen Requests:
(memo of 1-28-82)
A. Temporary Employee _
McAllister moved, seconded by Johnson, that Council
approve the hiring of Todd Langenbach at $6.50/hr.
per Johansen's memo of 1-28-82, effective February 2nd.
Motion carried unanimously (4-0).
-)-
Minutes of Special Council Meeting
February I, 1982
B. Temporary Increase in Cop-oensatorv Time earLy-over
McAllister moved, seconded by Hollenhorst, that Council
approve the compensatory time carry-over of up to 80
hours for the months of February and March; all excess
over 40 hours to be used by May 1st, as recommended in
Johansen's memo. Motion carried unanimously (4-0).
Report on Fire Board Meeting
Johnson reported that the Board is recommending a 5-year contract
with ISO (Insurance Service Office) inspection prior to 1985;
recommending a ceiling of 15% - 20% and a minimum of 10%.
Johnson asked Council's input as to whether the cities should
pay for an earlier inspection, anticipated to cost $3,000 -
$5,000, and be subject to the Fire Dept's approval.
.
Council concurred that the Board try for 15% maximum; queried
whetber Fire Dept. approval of inspection agency is required;
suggested the Board obtain additional cost information relative
to an equivalent inspection.
Johnson reported that the Board has requested a more detailed
annual report which will cover training, inspection, equipment
improvement, percent of increased costs put back into capital
improvements in the way of equipment etc.
Johnson
Marshal
Homes.
reported that the Fire Chief is waiting for a State Fire
report relative to the alarm system at Presbyterian
Uniform Fire Code
Johnson asked why City bas not adopted the Uniform Fire Code;
suggested that Council's reasons be listed for the Public Safety
Committee's consideration and recommendations.
Fire Lanes
Johnson asked about City's role relative to enforcement of "no
parking" in fire lanes; noted some areas of concern, some of which
are on private property; noted thst he has requested Ramsey County
ticketing of violators.
McNiesh noted that the City's policy has been to refer fire lane
parking situations to Fire Chief Koch for recommendations for
signage.
~tsman Club FishiEg Contest
Hollenhorst moved, seconded by McAllister that Council approve
and authorize execution of the Permit to Conduct Water Exhibitions
or Placement of Structures In the Lakes for the Arden Hills Sports-
man Club temporary stand on Lake Johanna during the fishing con-
teat February 27/28, 1982. Motion carried unanimously (4-0).
REPORT OF VILLAGE CLERK ADMINISTRATOR CHARLOTTE MC NIESH
1981 Use - Federal Revenue Sharing
Council was referred to McNiesh's memo (1-28-82) requesting ten-
ative Council consensus on the use of 1981 Federal Revenue Sharing.
.
After discussion, Council concurred with the transfer of $34,000.
Hollenhorst moved, seconded by McAllister, that a Public Hearing
be scheduled at 8:30 p.m. on February 22nd. Motion carried
unanimously (4-0).
Resolution No. 82-10, Apportionment of Assessments, Improvement
No. W 77-5 and W 78-2, Briarknoll Plat II.
Hollenhorst moved, seconded by McAllister, that Council sdopt
Resolution No. 82-10, RESOLUTION RELATING TO APPORTIONMENT OF
ASSESSMENTS RELATING TO COMBINED IMPROVEMENT W-77-5 AND W-78-2.
Motion carried unanimously (4-0).
Payroll
Hollenhorst moved, seconded by McAllister,
as submitted. Motion carried unanimously
to approve the Payroll
(4-0).
-4-
.
.
,
.
Minutes of Special Council Meeting
February 1, 1982
COUNCIL LIAISON REPORTS
McAllister
Hotel/Motel Tax Proposal by Ramsey County
McAllister reported that copies of Resolution 81-81, Opposing the
Proposed Hotel/Motel Tax have been sent to our legislators; noted
that the matter was removed from the current Ramsey County House
Delegation Agenda; assumes notification will be forth coming if
it is placed on the agenda again. Hollenhorst noted that it is
also opposed by RCLLG.
Tennis Court Lights
Council was referred to memo from Bu'ckley relative to replacement
of two light meters for the tennis court lights which will cost
$50 to replace.
Council concurred with the replacement expenditure if the meters
can be installed by the Parks Dept.
Finance Committee
McAllister asked if Finance Committee input, relative to the five
year Capital Improvement Plan, should be requested.
In discussion, it was suggested that information from the Planner,
Engineer, Parks and Public Works be compiled for the Finance Com-
mittee's consideration; suggested that s sub-committee be appointed
to discuss the plan with input from the Engineer and Planner.
City of Mounds View Proposal Relative to Shared Equipment and/or
Personnel
McNiesh reported that an informal meeting of clerks and managers
will be scheduled relative to equipment and personnel available;
a mayors meeting will also probably be scheduled to discuss other
ramifications of the proposal.
Ho llenhors t
Human Rights Commission
Hollenhorst reported that the Human Rights Commission is also con-
cerned about a burglary prevention program. Council concurred
with her suggestion that the Public Safety Committee and Human
rights Commission work cooperatively to establish a program for
the City. .
Communication Tower Strobe Lights
Hollenhorst suggested that an alternate lighting system be pursued
with Mr. Vaughan. In discussion, it was suggested that clarifi-
cation be requested from Attorney Lynden relative to the City's
position in the matter. McNiesh was asked to contact Lynden rel-
ative to status of the park dedication.
Woodburn
Roseville School District 623 Chemical Health Program
Woodburn reported receipt of a letter from the Community Health
Advisory Committee requesting assistance with chemical health pro-
grams in District 623.
Council referred the request to the Human Rights Commission.
Applicants for Council Position
Woodburn reported that four persons have expressed their willing-
ness to serve on the Council:
Dale Hicks, Thomas Mulcahy, Keith Ness and Jeanne Winiecki
Council concurred to delay the appointment until February 8th, to
give Council the opportunity to talk with the potential candidates.
-5-
Minutes of Special Council Meeting
February 1, 1982
Adjournment
Hollenhorst moved, seconded by Johnson, that the meeting adjourn'
at 1:25 a.m. Motion carried unanimously (4-0).
~d1l/J}ti~,L
Charlotte McNiesh
Clerk Administrator
&~'1##~\/
Ro ert L. Woodburn
Mayor
Notice of Meeting
The next Council Meeting will be held
at 7:30 p.m. at thp Village Hall.
on Monday, February 8. 1982
-6-
,
,
.
.
.
".
..~ ;
,.
Extract of Minutes of Meeting
of City Council
City of Arden Hills
Ramsey County, Minnesota
..
February 1, 1982
Pursuant to due call and notice thereof, a special meeting
of the City Council of the City of Arden Hills, Minnesota, was
held in the City Hall in said City on Monday, February 1, 1982,
at 7:30 o'clock p.m.
The following members were present: Mayor Woodburn and
Councilmen Johnson, McAllister and Hollenhorst; and the fol-
lowing were absent: One Vacancy.
Also present were Charlotte McNiesh, City Clerk Adrninis-
trator; Donald Lamb, City Treasurer; Donald Christoffersen of
Short-Elliott-Hendrickson, Inc., City Consulting Engineers;
Peter S. Popovich of Peterson, Popovich, Knutson & Flynn, City
Bond Consultants; and Dorothy Zehm, Deputy City Clerk.
MAYOR WOODBURN: The hearing this evening is for Improve-
ment No. SS-W-P-ST-8l-5.
MRS. McNIESH: We have the Certificate of Mailing and
Affidavit of publication for this project on file.
.
MR. CHRISTOFFERSEN: This is proposed Improvement No.
SS-W-P-ST-8l-5, which is primarily concerned with the Royal
Hills Subdivision. The general location is Highway lO - the
westerly portion - Briarknoll Subdivision on the north and
Floral Drive on the south and off the chart is Hamline Avenue.
The boundary description follows along the east highway line
of Highway lO, the south line of Briarknoll, through the park
and down through the park, along the centerline of Floral
Drive back to the east line of Highway lO.
The improvement consists of sanitary sewer, watermain,
storm sewer and street. First of all, I'll discuss the sani-
tary sewer. There is an existing sanitary sewer on Briarknoll,
being constructed by the developers of Briarknoll, which
terminates .at this particular point. It is proposed to con-
struct a sanitary sewer from the south end of the cul-de-sac.
.
'^
,
f
.
By the way, this plat is at the preliminary stages right now
and is before the Council for approval. It starts at the south
end of the cul-de-sac street and goes northerly to the north
boundary line. This particular reach of sanitary sewer has
not been constructed at this time. The reason for that not
being constructed - at one time the developer of the Royal
. Hills plat had a cul-de-sac street coming in this direction on
one of their preliminary plats, and had planned for the sani-
tarysewer to drain down the cul-de-sac and out in this direc-
tion. That was all the information that was available at the
time this plat was - at the time the plans and specifications
were approved for this plat. Therefore, this sanitary sewer
was not constructed. The developer of the Royal~ Hills plat
is making arrangements to have this little connecting link
constructed this summer.
Watermain consists of a watermain at the south end of the
cul-de-sac street, running northerly and connecting into
existing watermain on the Briarknoll plat. The Briarknoll
developers have constructed the watermain to the south line.
Watermain also extends easterly along Royal Lane to the park
area, down along through the park and back to Floral Drive.
The purpose of this particular watermain in this area is to
complete a looping system which eliminates long, dead-end
watermains, both along Norma Avenue and Floral Drive.
Storm sewer is proposed to be extended to the low area
in the park to drain the park and drain westerly to the inter-
section of Norma Avenue and Royal Lane and then westerly out
and down the steep hillside to the ditch along Highway 10 and
into a low area which eventually reaches a storm water deten-
tion basin to the north of Briarknoll.
.
There are two alternatives for streets. The basic con-
cept for streets, obviously, in the Royal Hill Subdivision, is
north-south for Norma Avenue and east-west for Royal Lane.
Where the alternatives come into play is whether or not to
build a cul-de-sac street or to build a through street down to
Floral Drive. The Council is considering either one alternative
or the other. The streets will be standard bit~nous surfaced
streets with concrete curb and gutter, 34 feet wide with a
gravel base. I believe that completes this presentation.
MR. POPOVICH: Mayor and members of the Council, the
total published cost of this improvement was $247,lOO. It
was petitioned for by the developers of Royal Hills, which is
in excess of 35% of the affected property owners. The base
plan of the project, including sanitary Sewer, watermain,
storm drainage and streets, totals the high figure of $247,100.
The alternate plan, with the cul-de-sac, would reduce that cost
to $228,700, according to the engineer's report. I should
point out that on page 6 of his feasibility report, he in-
cludes capitalized interest for only six months. That is
going to have to be changed to add an additional six months
2
.
t
,.
,
.
so that we have at least one year's capitalized interest. For
example, if we were to go ahead and issue bonds and date them
March 1 of 1982, our first interest would come due March 1 of
1983. six months' capitalized interest would not cover it
because the assessments made this fall would not come in until
next June. It's just one of those things that was overlooked.
That slight amount of additional interest would have to be
added.
The current preliminary plat shows there are l6 lots, but
there are two potential lots that are developable, which are
adjacent to Lot 10 of Block 2, just south of Royal Lane. If
we use a total of l8 lots, based on the base plan of $247,lOO,
the assessments, if 100% assessed, would be $l3,728 per lot
and if we use the alternate plan it would be $l2,706, approxi-
mately $1,000 less. The idea is that if the project is
approved, construction bids would be received this spring and
construction would start this summer. Don thinks we could get
the assessment roll in this fall so the first interest payment
would commence beginning with real estate taxes collected next
year. If that is the plan, we would then propose that this
project be included with the others that are pending for
financing and that later on this month we would have a resolu-
tion before you covering all of the projects that are to be
covered and we would have a bond sale roughly sometime by mid-
March so that financing for this project, as well as the other
ones that are pending, would be covered in one bond issue and
you would have no need for any additional financing for the
balance of the year. I would propose at that time to recommend,
in view of the interest rate situation, that we have a tempo-
rary bond issue, maturing three years from now. None of the
bonds are going out over ten years now and they are all
hitting l2%, which is the limit. In fact, Bond Buyer's Index
is over 13% on the national level, which is the ceiling, as
you know, in Minnesota. Most communities that are doing any
financing now are doing it on a temporary basis.
.
As to over what period of time to include the assessments
for the project, you might want to enter into a development
agreement with the developer as to pay it back "in a three,
four or five year period rather than spread it out over l5 or
20 years as we used to do because there's just no way we're
going to accomplish this with assessments being over a longer
period of time. That is something that will be considered at
the time of the assessment hearing, but for purposes of at
least some sideline discussion on it, our recommendation would
be a three year bond issue and a development agreement to be
worked out with the developer so that hopefully we wouldn't
have to go into long term definitive financing much beyond the
three year period. Under the new law, we do have the right
to take care of temporary bond issues by another temporary
bond issue, not to exceed three years, or final definitive
financing.' Most communities today are financing over a ten
year period. A few months ago it was 15. It's down to not
3
"
t
,.
.
.
more than 1993 and, of course, it means higher per year costs
but we do save on interest because the overall period of time
is cut down. With that, I'll be able to answer any questions,
if there are any. This is assuming that there will be an
assessment hearing this fall.
MAYOR WOODBURN: I think he's pointed out the difference
between an assessment hearing and ordering the improvement.
Tonight is the start of the process that orders or does not
order the improvement and this is not the assessment time. Of
course, Mr. Popovich has painted, as he always does for us,
the worst case. Mrs. McNiesh, do you have any written ques-
tions or objections?
MRS. McNIESH: There are none, your Honor.
MAYOR WOODBURN: We will open the meeting then in a moment
to comments from the audience. We're going to listen exten-
sively. This is certainly for all of us (inaudible) and I
don't think we can do right on this with everybody. I know we
can't and I hope you all appreciate that fact. We will try to
do right, however, even if we can't do right by everybody.
I believe the Council will probably have quite a few questions
but we'll go to the audience first for questions and comments.
will each person, when they comment or ask questions, identify
themself for the record.
MRS. SUE HUSTINGS, 4136 Norma Circle: I have, first of
all, a few questions and I want to hear what other people have
to say, but first of all, I would like to know what the park
dedication is from the contractor, Mr. Marcel Eibensteiner.
Does anybody know what that is? .By law, I understand that it
used to be that they had to dedicate 10% of the new development
to the park in land or in money. I was wondering what that's
going to be.
MAYOR WOODBURN: It's usually been 10% - a slight
variable figure - for parks or drainage improvements.
MRS. SUE HUSTINGS: I understand that, but. that hasn't
been decided yet, is that right?
MAYOR WOODBURN: That's correct. That is still under nego-
tiation.
.
MRS. SUE HUSTINGS: Another thing, I was wondering - why
do they want to drain that low area in the park? That is a
beautiful little pond that has beautiful oak trees around it,
that would be a beautiful wild garden if the road didn't have to
go through. I was wondering if they put that down there just
so that we the taxpayers would feel that we're getting some-
thing for our money. Is it necessary?
4
.
>
"
.
MR. CHRISTOFFERSEN: The intent is not to really drain the
pond dry. The intent is to provide overflow for the pond.
Currently the pond rises about two to three feet before it flows
naturally down to this area. It's just developed and graded
to make somewhat of a dam across here and the water would rise
higher in the pond and, as you well know, oak trees cannot
survive high water. So the intent is to put a control here
so the water will not reach a high level.
MRS. SUE HUSTINGS: Because of the artificial homes that
are going into the area - you're trying to save the trees.
MR. CHRISTOFFERSEN: We're just trying to protect this so
that it doesn't reach an unusually high level.
MRS. SUE HUSTINGS: Also, I was wondering why the alterna-
tive plan, with the cul-de-sac, is in the park rather than on
private property.
MR. CHRISTOFFERSEN: That was at the direction of the
Council - to show an alternative or cul-de-sac through the
park.
MRS. SUE HUSTINGS: Wouldn't it also be possible to have
an alternative on private property rather than on public
property? That is a possibility even though it isn't there?
MR. CHRISTOFFERSEN: It's possible.
MRS. SUE HUSTINGS: Also, it was stated that there were
18 divisions of this $247,000. I can see 16. Where are the
other two?
MR. CHRISTOFFERSEN: The other two potential lots were
just east of Lot 10 along this road.
MAYOR WOODBURN: We don't have the planner here to answer
some of these questions and I don't really like to answer too
many of them (inaudible). Those two alternatives were thought
to be the most feasible by the Council and the two to look at
first. The reason was to provide access into the park- better
access for people.
.
MRS. SUE HUSTINGS: I did talk to John Buckley and he
said it isn't important to get access to this neighborhood
park - that that was not one of the things that the Park
Department felt was important. Therefore, he feels that
(inaudible). I would like to be on record that that is not
something that the Park Committee has wanted.
MAYOR WOODBURN: We are aware of that, and the former
statements still stand. Does anyone want to briefly add to
the answer ,to that question since we don't have a professional
answer? Any more comments?
5
.
1
.
MR. MARCEL EIBENSTEINER, President of Royal Oaks Realty,
Inc., Developer of Royal Hills: First of all, I have another
question for Mr. Christoffersen on the storm sewer. The pond
has an elevation of 962.2 and the street is at 962.5 - 5/10
off. Why can't I drain the pond onto the street and down the
hill without bringing all the expensive storm sewer and catch
basins - I'm going to move the whole storm sewer all the way
down to the intersection, put in two catch basins and a pipe
going down to the lower area, eliminate all the pipe in the
intersection and all the way up to the ponding area, let the
pond area overflow into the street. It would have to be only
5/10 off, otherwise just lower the street another 5/10 and
then that pond would drain automatically down to the inter-
section. I'm out to save money and I figure I could save
$20,000 by eliminating the pipe from the pond to the inter-
section. Is it necessary?
MR. CHRISTOFFERSEN: Yes, I believe it's necessary. This
is roughly the area of the pond that. we're talking about and
currently your street is coming in in this location, roughly
in this vicinity, which will block part of the pond. You can
see the natural drainage area that follows down through this
area. It essentially drains down this way, down into a lower
area. As this develops, obviously there will be a road sitting
there as somewhat of a dam. It's not good practice to have
water pond to the side, raised to an elevation that would slop
over the curb into the street. That's not good practice.
Another consideration could be - and we thought of this, but
obviously we don't know the complete answer until we get into
the design phase - it could be possible to create some fill to
raise the bottom of this pond to where it's not holding water
and the water runs off into that. low area, similar to the way
water would run off of a lawn. That's acceptable. But to have
water fill up in the pond and then slop over into the street
that's unacceptable.
MR. EIBENSTEINER: How about if I fill it up?
MR. CHRISTOFFERSEN: We don't know at this point in time.
MAYOR WOODBURN: The question arises - what is "it"?
MR. EIBENSTEINER: Fill the pond. I think if I filled
it in, it would only have a depth of about two feet.
.
MR. CHRISTOFFERSEN: That could be. As I say, I'd
rather have . . .
MR. EIBENSTEINER:
(Inaudible) fill it in to two feet
and
. . .
MR. CHRISTOFFERSEN: (Inaudible) some elevations on the
street. We don't have any complete data. We're still working
with preliminary information right now. Rather than to not
6
~
.
have it in, I'd rather have it in - show it tonight - and then
take it out later if it's not needed. To make it to the point
where it's not needed, we'd have to fill in the pond to bring
it up to an elevation where it would run off similar to a lawn.
COUNCILMAN JOHNSON: What was the elevation of the road
again?
MR. MARCEL EIBENSTEINER: 962.5.
COUNCILMAN JOHNSON: Center of the road or curb?
MR. EIBENSTEINER: Center of the road. And the pond is
962.2.
COUNCILMAN JOHNSON: You indicated that it is not what
you consider a good design. What's the problem?
MR. CHRISTOFFERSEN: I wasn't concentrating on what he
said the road elevation was.
COUNCILMAN JOHNSON: 962.5 against 962.2. The road is
3/l0 of a foot above . .
MR. CHRISTOFFERSEN: What happens - first of all, he's
basing it on the contour map. They could be off a foot or so.
If this pond is lower than what shows on the contour map, even
the way it is right now - you're talking two inches, three
inches, four inches of water - the water would pond right up
to the road surface and then flow over the boulevard 'area and
into the road. That situation is not a good situation for
drainage - to have open water filling into a large area and
then spilling over into the road and running down the street
to catch basins down below. If it was a grassy area - for
instance, the pond could be filled up to a maximum level if
you don't have an outflow. If you have a heavy storm, then
all that water - you'd get lOO% runoff in that pond because
it can't hold any more water, and it would just run right out
into the street and down the street, where if ~t was lawn or
turf there, you'd have an opportunity to run it off ahead of
time. It wouldn't be ponding there and during the same type
of heavy storm, you still wouldn't get lOO% runoff.
.
MR. GEORGE KRUEE, 4258 Norma Avenue: In the discussion
about the road level, and earlier you mentioned the trees -
where do the trees come in? If you allow natural runoff, the
pond is going to fill up to a level at which it starts to
run off. Where are the trees going to be involved in this?
Are they going to be under high water then?
MR. CHRISTOFFERSEN: I really don't have the exact
elevations on the trees. (Inaudible) that we use for deter-
mining these elevations are very preliminary in nature now
and it was taken off the aerial contour map. There were not
any surveys made to determine contours at this time.
7
.
.
,
MRS. SUE HUSTINGS, 4136 Norma Circle: One of the things I
was interested in, after I thought people were going to start
talking a little bit about this, is number one, I'm sure I'm
one of the majority that don't want the road coming through
Floral Drive for many reasons. However, if it were to come
through, I would like to know how we are going to be compen-
,sated for the roadway that would be taken away from the park?
Is there any allowance for it? I mentioned the dedication
before - I understood that they used to have to payor give to
the parks a certain amount and I don't know that before we've
ever had to give to somebody else that has easy access to their
development. I would like to know if there has been anything
ever considered about that. Or if the road is just allowed to
go through, what's going to be given to them? Also, if it did
go through, who is going to pay to move the park equipment?
We don't have much up there - we've waited a long time for
the little bit that we have - and I would like to see, if it
did go through, that it was put back in as good a shape or
better shape than it was before. I think that should be a
consideration. Another consideration is that by all these
homes being brought in, Hamline Avenue is just a zoo. You
can't get out there. If you haven't already planned it, I
think you should plan to get a stoplight either on Colleen,
the Briarknoll area, or somewhere. I know you can't do it on
Floral Drive because the freeway would back it up. But that
really should be a consideration, and soon.
MAYOR WOODBURN: Some of your questions are rhetorical,
which is perfectly fine.
MRS. HUSTINGS: I don't know the answers. I feel you
have a very hard job up there and you're not going to satisfy
everybody, but if you can't satisfy us in one way, I don't
want to be taken in two ways.
MR. DELBERT JOHNSON, 1359 Colleen Avenue: In a previous
meeting, there were various ideas discussed relative to
emergency vehicle access in the event that a single road was
put in down there. In the Briarknoll section, with that
coming straight down Colleen, I'd be curious to' know what
effect the last two major storms would have on those proper-
ties - the new properties that would be sitting down in that
area - with only one access out. I think that would put a
tremendous strain on the people on Colleen and getting on
Hamline Avenue during the rush hour.
MR. CHRISTOFFERSEN: I believe what you said, sir, is
that if this was constructed without a through lane, the way
out, primarily to Hamline Avenue, would be this long way out.
Due to the recent weather conditions, it would be much more
difficult to get out this way than it would be to come out
like this. Is that correct?
MR. JOHNSON: That's correct.
8
i
.
MR. CHRISTOFFERSEN: We have made a traffic study of the,
area and obviously all of the traffic that is leaving at this
area would be projected to leave (inaudible). I can't tell
you the exact numbers right off the top of my head - I would
have to look at the report - but I believe it was something
like 200 cars difference. Maybe it was 400, I don't recall,
but it would cut the traffic - by projecting it through here,
it was projected that the traffic flow from here would be cut,
but it would obviously be added here. As far as access to the
site, starting right at this particular point - this is a long
cul-de-sac street. This street connects to Snelling and
Snelling goes out to 96. So we start at this point - consider
that a cul-de-sac street, from here down - it's intensified by
these two cul-de-sacs. If you could just take these two off
and add them down here, it would end up being this long,
theoretically, because you would have that many more houses.
along the cul-de-sac street, with a lot of traffic moving in
that direction. Also, there is a long dead-end street here.
It's intensified by the fact that there are cul-de-sacs off
of that without a loop. That's one of the reasons why the
Council is considering the loop through the park.
MAYOR WOODBURN: All these questions related to safety,
and snow plows and clearing, I don't know if you want to com-
ment on them.
MR. CHRISTOFFERSEN: Say we had some kind of blockage -
a watermain break or something that would put a restriction
on the street today, with the snow on the side - it would be
extremely difficult to get down from one direction. That
could occur.
.
MR. GERALD DREYLING, l377 Eide Circle: I think what we
should have everybody looking at now is the traffic flow.
There are probably going to be about l50 houses eventually in
Briarknoll and there are l7 houses in the new division.
Briarknoll basically has three exits planned - one through
McClung, one next to McClung, and then Colleen Drive. In-
dian Oaks I don't think you would consider a Briarknoll exit.
. If you were to take and not consider a road through Floral
Park, you will have 17 new units or houses added to the
development's exits. About a lO% increase. If the people on
Floral Drive, who now have a bad traffic situation - in fact,
it's much worse than Colleen Drive - were to have that open -
they have l7 houses, plus their 35, plus probably another 20
or so units because it's closer to go out Floral Drive
(inaudible) which will probably double, possibly triple the
traffic. The people on Colleen Drive will probably have an
increase of ten or fifteen percent with this development.
Granted, that is an increase, but it's only lO% or 15%. I
assume the development design is planned so that they would
have good access and exits from what they have now, dis-
regarding the new development of Royal Hills. If you take
and consider a double or triple flow on Floral Drive, it's
kind of ludicrous to say that Colleen Drive should have a
problem compared to Floral Drive. I consider that a strong
9
"
.
issue in saying that if you double or triple the flow on Floral
Drive, you have a very serious traffic situation there that
you will never be able to resolve. You'll have the possibility
of more accidents, which I think can compensate for any kind of
danger from the problem of fire trucks coming in or snow plows .
going out. You have to consider the safety problems of that
intersection - at Floral and Hamline - as being a very serious
consideration that should probably negate any serious consider-
ations for fire trucks having problems coming in and out -
possibly losing five seconds if they have to go the long way.
I looked at the map and any fire trucks that come from the
Johanna or other fire departments can probably come in within
five seconds difference, whether they go to Floral or Colleen,
and possibly in the same time because there's a very quick
entrance from Snelling if you go the New Brighton way, and it's
probably quicker from the one on Highway 96 and Rice Street, if
you come in and down Colleen to that small spot there. I don '.t
think it's going to take much longer. If you want to check,
you can, but I looked very carefully at the map. The only
thing I consider a difference is the snow plows. The way they
plow my cul-de-sac (inaudible).
MAYOR WOODBURN: The Public Works Department keeps telling
us not to make cul-de-sacs because they're so difficult to
plow. So those of you who live on cul-de-sacs will have a
problem, but hopefully the other advantages make up the dif-
ference.
MR. CHRISTOFFERSEN: I can clarify the traffic. The cur-
rent traffic on Floral Drive is approximately 400 vehicles per
day, from both directions - this is without a connection - and
from Colleen, the projected traffic is 1100 vehicles per day.
If the road were placed through the park to Floral Drive, it
is projected that the traffic on Floral Drive would double, up
from 400 to 800, and that they would subtract the 400 vehicles
from the 1100, or 700 vehicles per day that would go to
Colleen. By putting it through, in effect you would have
about a SO/50 traffic split.
.
MR. JOHN MINER, 4126 Norma Circle: I've lived for eight
years in Arden Hills, I like it here, I think the Council and
Planning Commission have done a good job. You've brought
Mutual Service in, you brought Cardiac in, Land O'Lakes, and
the City has to grow and I understand Marcel has to develop
his property and I agree with all of those things because I'm
in business for myself. But there has to be a time when you
have to look at all of the things involved. It's very, very
easy in this case just to say hey, for a fire problem or a
snow problem, let's bring that through and let's charge the
people and get it done. When you look at the map, it appears
to me that there are 158 people that are eventually going to
be living in this general area that we're talking about. 158
families. Forty of them live on Floral Drive, in that
general area, and use that Hamline Avenue exit, which never
used to be a problem, but we want Arden Hills to grow, we
10
,
.
need the. tax base, so we did add a few problems, which has really
culminated into one big problem at Hamline and Floral Drive. .
A problem so serious that someone is going to get killed some-
day if we don't get the traffic light. We've already had, I.
think, three accidents that were maybe before your time on the
Council, but the people that live on that street know. When
the people built on Colleen in that area, I feel very bad for
them because they have a serious problem also. But they do
have three exits to go through. I realize this is inconvenient
to go through this exit and through McClung and through Colleen,
but you all know, to get on the freeway, what we have to go
through to get on Hamline to get to 694 going north. It is a
problem to exit. So they already have three exits. We have
one. Their properties aren't all developed yet. They have
some of the property developed, but their problem isn't as
serious as it's going to be. It will get more serious. We
have all of our property developed and we can't really face any
more serious of a problem in that area. I don't see how, in
good judgment - and we're projecting this traffic, we don't
even know what it is - we know we have a serious problem now
and we're just saying it's going to become more serious. I
don't see how they could even possibly consider running that
through to Floral Drive. Not because it's going to hurt us -
I live there, I don't mind that. I understand that you have to
do some things. I think you have to consider the fact that we
can't get out now on Hamline. The people on Colleen -they
have a problem - but at least they have two other ways to go.
They can go out and turn right on 96. We can't do that. When
those cars come whistling down Hamline, remember - Hamline and
Floral Drive are just less than a half a block when the freeway
splits - you know, when it comes together - and boy, I tell
you, they come shooting down there like race cars. It's a
problem if you have two or three people waiting to get out.
Believe me, you start taking unnecessary chances to get out of
there because you have to almost come to a running stop at the
corner to make it out. In the winter time it's even worse.
If you consider putting that street through here somehow to get
onto Floral Drive, I think along with the consideration you
have to put a semaphore there. I don't think there's another
way. I think it will be until somebody gets krlled and then
it will be too late. The other alternative is to not put it
through at all, which I think, at this time, possibly makes
more sense. It costs' a lot of money and who is it really going
to benefit? We've had sporadic meetings with the Council and
we try to come to them all and we really don't get a full pic-
ture. Do we really need it? Is it absolutely necessary? Is
it going to save lives to do that or is it going to take lives?
I think that's really important. I just wish that you would
consider - I know you're not going to vote tonight, but if
there are 40 people who live in this area and all 40 people
ask you not to put that through, would that make a difference?
We're the ones that are going to be affected, we're the ones
that live there. These people that moved in, moved in later.
They had no more idea than the man in the moon that this road
was ever going to come through until Marcel asked for that
.
11
"
road. I don't think it's fair. There was no reason - we never
knew that road was going to come through.
.
COUNCILMAN McALLISTER: I have one comment by the same
token - if it's so dangerous to turn out on Floral Drive, if
the road connection is put through, then you on Floral Drive
also have the alternative of taking the long way out and around
too.
MR. MINER: I appreciate that. I'm just saying that things
are just fine the way they are. Is it necessary to complicate
matters? Are we gaining a lot by doing that? I think that's
what we're here to talk about. A lot of money is going to be
spent and Marcel wants to develop that land properly and we
want the proper plan for the City. Yes, I appreciate the fact
that we can go out that way. Absolutely.
MRS. MONICA TUGGLE, 4126 James Circle: I have a little
letter from my daughter here concerning the park down there.
She feels the same way as about 50 other kids that live in that
area. Right now it's safe for the kids to ride their bicycles
across the street and everything else. When that road is put
through, a lot more traffic is coming through there and the
kids won't have any safe place to play and go to the park.
Right now I feel my daughter is old enough to go down there by
herself - she's ten - but with increased traffic, I don't think
any child should be on that road. I counted 30 kids, ten and
younger, living right between James Circle and Floral, in that
area. Also, there is no west exit to the freeway, so if any-
body thinks of coming through there with ambulances, snow plows
or fire engines, most of the hospitals that are downtown, you
have to take 35W or even go up to 10 to take 96. There is no
throughway otherwise. You would have to go all the way to
Lexington to even find a way out to go to a freeway. I don't
think it's a very good idea to put a road through there. Thank
you.
MR. TIM TUGGLE, 4126 James Circle: Has any consideration
been made to the condition of Floral Drive if that road does
. go through there? Right now that road isn't wine enough to
maintain constant two way traffic like that. It's a typical
dead-end street, narrow - it would have tOLWidened.
MR. CHRISTOFFERSEN: I'm just taking a shot in the dark,
but I would say it's somewhere around 30 feet - 28 to 30 feet.
.
MR. TUGGLE: When you drive down it, it doesn't seem like
a normal-width road.
MR. CHRISTOFFERSEN: The roadway is about 28 feet.
MR. TUGGLE: Is that normally wide enough to have a car
parked on it and still have two way traffic going by it?
MR. CHRISTOFFERSEN: Normally it takes about the mini-
mum is II foot traffic lanes. So you're talking 22 feet,
12
.
subtract that from the 28, you'd have six feet.
.
MR. TUGGLE: l~ich is narrower than a car. I know you
can't do it because there are cars parked along there and you
have to wait for the oncoming car to go by before you can go.
This is in the summer too.
MR. CHRISTOFFERSEN: Village standards on improved streets
are 34 feet.
MR. TUGGLE: Does that mean they're going to widen Floral
Drive?
MR. CHRISTOFFERSEN: That's up to the Council.
MR. DELBERT JOHNSON, 1359 Colleen Avenue: I see a very
emotional issue before you. I don't see any real solution,
like a number of people are stating, to the problem. We have
children and access to the park. We appreciate Floral Park,
we don't want to damage Floral Park, nor do we want any of our
kids to be injured going to Floral Park. An increased traffic
flow on Colleen Avenue is a risk to our children getting to
Floral Park - we have the same problems you people have. We
have the same common goal - safety. That's one thing. But now
we have an economic issue involved and they're talking about
$247,000, plus widening Floral Drive. In Everett Dirkson's
terms, a billion dollars here and billion dollars there, pretty
soon you're starting to talk about real money. Maybe we're
starting to talk about real money here now. All of these con-
siderations, someone is obviously going to have to pay for them.
RITA SCHUNICHT, 1469 Colleen Avenue: I have a couple of
questions. First of all, as far as the assessments for the
road through the park - I'm wondering who would pay for that
and I'm wondering if it would make a difference if the people
on Colleen Avenue would express a desire to help with that,
considering that we are paying for something that will benefit
us in terms of reduced traffic. My other question is -
regarding the traffic on Floral and Hamline - ~ believe there
was something brought up last time about another alternative
for helping to ease that. I'm wondering if we could have that
repeated.
.
MR. POPOVICH: There are 18 lots that would be benefitted
and they would be the ones that would be assessed for this.
Unless the City Council put some of it on general taxes -
then you would get more than Colleen - you'd get the rest of
the City as part of the project. Is Colleen in the assessment
area?
MR. CHRISTOFFERSEN: No.
MR. POPOVICH:
either, so there's
lots and then some
They're not in the area that was published
no way we can say we'll put some on the 18
on the other ones, because they were never
13
"
.
included as benefitted property within the legal description
that was published. Legally, at this point, based on the way
it is now, it couldn't be done unless you started over again,
assuming you felt it was benefitted. Then' that's a real ques-
tion - how much is it benefitted? Then you get the appraisal
situation and all the other stuff - I'm not so sure there is a
benefit up there that is so significant that you could assess
them for it.
MAYOR WOODBURN: The City is very hard pressed for money
this year - we could accept donations.
MR. POPOVICH: If they voluntarily donate it, that would
be another thing. My experience has been you get one or two
and the rest don't.
RITA SCHUNICHT: About the other alternative on Hamline
and Floral, the other alternative for easing the traffic flow.
MAYOR WOODBURN: I guess you're specifically referring
to some widening, perhaps, or some improvement like that. Mr.
Christoffersen, do you have anything further to say on that?
MR. CHRISTOFFERSEN: We really haven't looked into it
thoroughly. We did look into widening the west side of Hamline
Avenue, somewhat trying to create a merge lane. That type of
situation usually isn't done. You may think it's high volume
traffic, but it really isn't considered high volume when you're
in the traffic business. For instance, there is a merge lane
right now off ,of Colleen - when they had their projected traffic
(inaudible). I suspect that when Hamline Avenue is improved,
Hamline Avenue would be widened~, Several years ago the Council
did consider widening Hamline Avenue and it was not accomplished
because many people were opposed to it. It was discussed to
widen it to either 36 or 44 feet at the time. I think the
current standards for widening Hamline would be probably 46
or 36 feet. The 36 would 'have restricted parking on one side.
That intersection, as far as semaphores - I'd like to ans~er
that question with some comments about traffic signals on
Floral Drive and Hamline. That particular portion of Hamline
Avenue is controlled by the State of Minnesota. If there are
any traffic signals put up in that location, the State of
Minnesota would be involved in it.
.
MAYOR WOODBURN: What is the cost of a signal?
CHRISTOFFERSEN: That's kind of out of my ballgame. I'd
have to go to my traffic engineer. I'll take another shot in
the dark - $85,000 to $IOO,OOO.
MR. MARCEL EIBENSTEINER: At what point will it be
determined what part of the assessments are my portion when
the street runs through the park?
14
MAYOR WOODBURN: When will that be determined? At the
assessment hearing.
.
MR. POPOVICH: The idea is that after'the project is all in,
then you have a firm idea of what the total costs are. Right
now these are just projections. At that time a preliminary
assessment roll is prepared and the people will all get notices
for another hearing. At that time we would know exactly what
would be assessed. The engineer would have to get all of these
things together as to what those costs are and then assess your
lot.
MR. EIBENSTEINER: I must admit, you shocked me this
evening when you mentioned it, when you took the total cost and
divided it by 18 lots. In other words, I'm paying for the
complete street through the park. I don't want the street and
I don't want the cul-de-sac. I'd just as soon stop right at
the end of my property. If the street has to go through the
park completely and I have to pay for a complete street - or
all of the assessments - I can't afford it. It's up to $13,000
something per lot for assessments. By that time it just be-
comes unfeasible to plat the rest of the area. A couple of
months ago, I was always under the impression that the Village
would share, or the Park Board or somebody would share in the
cost of the street. If I have to bear the whole cost by myself,
I just really can't afford to go ahead with the project.
COUNCILMAN McALLISTER:
(Inaudible) $12,OOO.
MR. EIBENSTEINER: I had figured I'd give half the cul-de-
sac for park dedication and the other half would be shared
(inaudible). But the total cost, putting the whole street
through, runs $37,000. I can't afford that. But the thing is,
when will this be decided? I don't want to put all the improve-
ments in and then come to the meeting and have them say I get
all the assessments. Then it's too late.
.
MR. POPOVICH: That's the purpose of the meeting tonight
the feasibility of the project. Feasibility so far as layout,
safety, and estimated costs. We're 99% within the ballpark so
far as the costs are concerned. If you feel the project is not
feasible - the engineer, in his report, has said it is feasible,
even with those economic costs. $12,000 or $13,000 is not
unusual for lots for complete utilities and streets. In fact,
I've seen them $15,000, $16,000, $17,000, $20,000. That varies.
That's a judgment you have to make. If you feel, knowing what
you have in the land, that this on top of it makes it too much,
then you ought to tell the Council - I don't think the project
is feasible. This is a feasibility hearing, to be voted up or
down as to whether it's feasible, considering everything -
projected costs, layout, safety, everything else. Only you
can make that decision. That's why the Council is holding the
hearing.
15
"
MR. EIBENSTEINER: Will the Council tell me this evening,
or at a later date, if they'll share in the cost of the street
or if it's absolutely my cost? When will I find that out?
.
MAYOR WOODBURN: Legally, we don't know until the assess-
ment hearing, as Mr. Popovich has indicated.
MR. POPOVICH: We're going on the basis of 100% assessed -
that you were going to pay it all. You want to go on that
basis in making your response. Now, whether the Council deter-
mines to put part of it on general taxes or part of it out of
some other fund and then just assess - I've seen 90j10, 80/20 -
80% assessed, 20% on taxes - it varies. But itJs your job to
convince the Council. Our recommendation is that you're
developing the land, it's your land, that normally developers
pay 100%.
MR. EIBENSTEINER:
the plat is approved?
the assessment hearing
will I find out at a later date, when
Or can I find out ahead of time, before
next fall?
MAYOR WOODBURN: I think as a practical matter the Council
has commonly had an idea of which way they're going before
the assessment hearing. They have to in order to judge the
feasibility of it. That idea is not a legal idea and is not
binding, but it's an assumption of the way things could go to
make it feasible, if it should be feasible. In other words, we
will, I presume, have some idea of the feasibility of this
based on what you're saying, which reflects then into the
financing of it at the time we approve the plat. That is an
idea and it's not binding and I'm sure that you're aware of
that. It never has been in anything that you do, except some
things have been a little clearer cut. I don't know how to
answer it any better than that. I expect we'll have an idea
of which way we'll go. You're telling us that $l2,700 would
be feasible - that's the cul-de-sac.
e.
MR. EIBENSTEINER: I was figuring half the cul-de-sac
price. The cul-de-sac price right now is $20,000. I figured
$10,000 plus the regular assessment. At the same time, I
was going to cut the storm sewer down to $23,000 from $45,000.
I have to work that out with Don. I just don't like to spend
storm sewer money when no water goes down the storm sewer.
I have a place on Nursery Hill Court right now, I put a lot
of money in Nursery Hill Court and there's a storm sewer there
that never drains water. I want to make sure this project
doesn't end up the same way. I can live with half the cul-de-
sac.
COUNCILMAN JOHNSON: Before we can go with this tonight,
I guess I'd like to get a little bit more into the storm
sewer drainage to find out what this is all about.
MR. BOB VOSIKA, 4268 Norma Avenue: I have a question
related to the land use within the park, for either the
16
cul-de-sac or the through street.
I think there was an estimate that
with the street was around 4/10 of
At the last meeting, I recall,
the total acreage to be used
an acre. Is that correct?
.
MAYOR WOODBURN: I think the figure was about that.
MR. BOB VOSlKA: One of the things I would like to bring up -
I live in the Briarknoll development and we do have very limited
access to the park right now. There is a plan for a through-
path through to the park, but in actuality all it is is a
graded path right now and we're very dependent on the weather
as to whether we can get in the park or not. Last summer,
actually, myself and my family had to go around'on Hamline
Avenue in order to get in on the south side of the park in order
to get into Floral Park. Right now, there is very limited
access for the people in Briarknoll to get into the park. Also,
in talking with some of the neighbors, the park is a very beau-
tiful park, but in actuality we feel it is too secluded. A
lot of people are not comfortable with letting their young
children go over to the park, children under ten years old.
In reality, it's too secluded. I feel the access with the
street - where people can either come in on the street, get
higher visibility and as far as a safer park for the children -
I feel it would be much better. The other issue related to the
use of the park - the park, in my understanding, has a total
of in excess of 20 acres. I know there were some people that
were concerned about using up good park space, but in reality,
4/10 of an acre is about only 2% of the total park use. I
really don't think that's an issue, as far as being able to
feed the actual traffic, recreational traffic into the park.
One of the other issues I would like to cover is that there are
approximately 95 residential lots within Briarknoll. I think
25 of them are inhabited now. As far as the people partici-
pating with the Council tonight, there are really only 25%
of the people that can participate and 75% that will be future
residents. I'd like to speak for the people that are now
residents in Briarknoll and also the additional 75 residents
that would like to be able to use the park.
MR. CHRISTOFFERSEN: Your Honor, the acreage that would
be taken up by the paved surface, with concrete curb and gutter,
is about half an acre - about 550 feet long.
MAYOR WOODBURN: Have there been any other figures put
forth, that you are aware of?
.
MR. CHRISTOFFERSEN: 4/10 is what I estimated the last
time.
MAYOR WOODBURN: As far as how it affects the park?
MR. CHRISTOFFERSEN: Not that I'm aware of. I think ,he
Council discussed it at a meeting, about the percent of usage
by the people in the area.
17
.
.
ADELE ANDERSON, Park Department: Insofar as how it effec-
tively affects the park, I think that's a matter of judgment.
Fortunately, I didn't bring my slides, as I did at the last
meeting, to show you what my attitudes were as to cul-de-sacs
in the park. I felt it affected quite a lot - a whole section
of the park - the whole front area, insofar as how it was used
and if it could be used at all. I realize that's a matter of
judgment. Insofar as getting into the park from Briarknoll,
the Park Department was constantly on the developer of Briar-
knoll to get that access cleaned up so that we could, in fact,
develop that access. Developers move very slowly. Therewas
a mound of dirt there, it seemed like years and years, and we
kept asking them and they said eventually it would be done.
They finally did get it graded down so this year we will be
able to put a decent path through there so you can take your
bike or go by foot or whatever. It will be a fine access.
That's not a problem. The delay was not the fault of the Park
Department - that was the developer. I had figured it was
more like two acres that it affected the park. But, like I
say, that's a matter of judgment.
..
MR. GERALD DREYLING, 1377 Eide Circle: I would like to
speak again with regard to the park. We try to develop parks
in Arden Hills as neighborhood parks. The idea of a neighbor-
hood park is to be secluded. There are very few of them that
have the real seclusion of Floral Park. It has some drawbacks
in that it creates problems for very young children, so there
has to be supervision, but it has some positive aspects in
that you can take your family there, sit down, and deliberately
have a quiet time together, without anybody corning in and in-
truding, unless they come and do the same thing and have a
good time. There's very little outside influence that bothers
you. Bringing the road in, you completely eliminate that.
You'll have a flow of traffic through there and you won't have
that seclusion any more. It bothers me to think that we're
going to set a precedent by cutting a road right through the
prime part of one of our parks. It may very well happen again.
I think it has to be some kind of a development that needs, a
road through it because we feel it's necessary for fire safety
or plows. I think we have a very special park: I enjoy
going there. I'm prejudiced - I'd like to go there all the
time. I'd hate to see the park literally cut up, as it would
be. The best part of the park would be cut up. There are
many parts of the park on other sides, but they're not as
(inaudible). There's a lqt of swampland in Floral Park. We
have a problem right now that I might as well address - the
south drainage of the south ponding area .is plugged' since last
summer. I just thought I'd mention that to see if Rice Creek
Watershed wants to do something about it. It may have been
somebody below with equipment that plugged it because I saw
that they had put the dirt right over the side where the cul-
vert is. I talked to John, but he can't do much about it
until spring. There is a drain that goes down toward Gale
Circle, I think it is. I believe the drainage is supposed to
go down there. It is plugged.
18
MAYOR WOODBURN: We'll make a note of that and have it
looked at.
.
ADELE ANDERSON: Could I address the part about park dedi-
cation? The Park Committee feels that the cul-de-sac being put
in the park would sort of be to the convenience of Mr.
Eibensteiner and now he's telling us that he's going to give
us part of that as dedication. We never really asked for it
and we'd kind of like to have money instead so that we can do
some new things in the park. Am I hearing that this is to be
our dedication? The cul-de-sac?
MR. EIBENSTEINER:
I hope so.
ADELE ANDERSON:
Mr. Eibensteiner, but
the pond. Apparently
he wants.
I don't like that. I have nothing against
I hear him saying he's going to fill up
he thinks it's his land, to do with what
MR. EIBENSTEINER: I really didn't mean that. I could
fill up the pond. I don't want the storm sewer. That's all.
ADELE ANDERSON: If you're thinking of dedication, we
would like to think in other terms.
MAYOR WOODBURN: I have two items I would like to ask
about. We do have a cul-de-sac in a park - Mrs. Zehm, I
believe you're familiar with that (inaudible). How was that
handled?
MRS. DOROTHY ZEHM: That was handled as park dedication
for Karth Lake, built by the developer in our park, as park
dedication for that development.
MAYOR WOODBURN: Another
somebody - the feasibility of
does somebody have the figure
Arden Oaks was projectJ at?
question I have to address to
Arden Oaks, I believe it is -
on what the cost per lot in
..
COUNCILMAN McALLISTER:
to be $15,600 per lot
MR. OSWALD TSCHIDA, 1445 Floral Drive: I don't like to
see the road go through the park either' because the road would
go past my garage about fifteen feet away. Who wants to have
a street that close?
The assessments there are going
MRS. UDAGER, 4255 Norma: I use the park a lot. I love
to ski and it is kind of hard to get down in there, but I hear
that is going to be cleared. I have one problem - we work in
the day time and it's dark in there. I'm used to parks where
there are lights. Why are we so against lights? I went
skiing the other night and I must say, it did frighten me a
little. Everybody says that I'm crazy to go out there. Why
19
.
are we all saying this? Is it wise to have lights? I know a
lot of children go out there. There's nothing finer that going
out sleigh riding at night. Walking in the evenings, a lot of
us don't get the chance except on weekends. The evening lights
were beautiful over in Shoreview when I lived there. I used to
go night skiing all the time because there were lights. Is
that against the principles? I hear we don't have any street
lights because people don't want them. Everyone I talk to
wants them, so I'd like to know who doesn't want street lights.
MAYOR WOODBURN: Can we note your comments? Perhaps they
don't go toward this improvement.
MRS. UDAGER: Yes. You were talking about using ~e park
and that's why I wanted to bring that up. Doesn't it ~mprove
the park to use it? I've been over in the park - that's what
I was going to get at - how many times, and I see very few
people over there and I think it's too nice of a park not to
use. Very few people have I seen, and I'm over there an awful
lot. I guess that was the brunt end of my remarks. I think
we should use it - it's beautiful.
.
MR. WILLIAM BERNTSEN, 1479 Colleen Avenue: I really
appreciate the traffic problems the folks have down here. On
Hamline - I think I was about the second citizen to move into
Briarknoll No. I and there really has hardly been a morning
when I haven't had to - sad to say this - make some driver
rather irate after about three or four minutes, coming out on
Colleen, sneak in between a couple of cars, and all the head-
lights were blinking at me from the rear end. Whether there
is one or two or three here, citizens coming into the Briar-
knoll No.1 area, we all have similar problems exiting onto
Hamline. I think the real issue before the Council here is
. . . (Changed Tape) . . . I don't think it's reasonable for
anyone to subject them, if suddenly something should be a
problem here, to go clear 'out to 96, back over to Hamline and
down. I really feel that if this plat - I'm not sure whether
it's been approved or not or whether it's in the process -
is going to be approved, that these citizens should be given
equal access to this and I think the citizens who will even-
tually reside here, too, should have opportunity to exit
either way. It really is a matter of the welfare and well-
being and safety of the people here, in terms of access to
the streets. I really feel that approving anything in here -
in fact it should have been thought of here - demands equality
of access in traffic in both areas.
MRS. NANCY KLEINMAN, 4242 Norma Avenue: I would like
to address the issue of safety for the children. We have a
young child, and I brought her over to the park on several
occasions and felt very frightened about the seclusion of the
park. It's very, very secluded. I think that if we would
have a street it would help. Children don't belong in streets,
20
>
>
.
they shouldn't be playing in them, but I do feel that opening
up that area by having a street there would not only increase
our access to the park, but increase the safety for our chil-
dren. '
MR. GARY RIPPENTROP, 4120 Norma Circle: Back to what
this gentleman was asking about on Floral Drive - I can appre-
ciate what the gentleman said a moment ago on Colleen. I
think when you do look at that area, I think that you have
to, number one, realize that it has not been platted - you're
only looking at it at this particular moment - thinking also
that those houses that are along Floral - for example, I've
been there for nine and a half years now - it's been set quite
a period of time and all of a sudden, as Mr. Christoffersen
mentioned, you double that traffic flow out on to Hamline, you
must have to, as he indicated, you look at that street and
where it is a 28 foot street right now, there must be at some
point that you do have to expand that or do something to
accommodate the additional traffic flow through there. If
you're looking at the feasibility, which Pete was mentioning
on the whole process, I think you have to also look at that
and again, remembering that those homes have been there for a
long period of time, most of them in that area, and all of a
sudden we're going to develop that. As the gentleman before
indicated, I think maybe it should have been looked at in that
second development right before Briarknoll Drive, in there,
but there are those different accesses and they ask about a
restriction that occurs on one of the avenues up there. I
think the same restriction occurs if there's something on
Floral - there is no way out at this particular point that
the exits have to go there. There are those additional exits
up above there and so I think you have to look at the width
of that street, as well as that traffic there. I also
believe, at prior Council meetings, we talked about possibly
an alternative coming out on Hamline. As I recall, the State
controls north of Floral Drive. Does it not? In other
words, the point is, I don't think you, as a Council, or
Arden Hills, can do anything about widening it at that par-
ticular point. Wouldn't that have to go to the State to
widen that, or some kind of State approval?
MR. CHRISTOFFERSEN: They have State approval.
.
MR. RIPPENTROP: As the gentleman from Colleen said,
yes, there is a problem on Hamline Avenue and complicated by
the snow. There used to be, as Mr. Miner was saying before,
you came to the stop sign and unfortunately you didn't really
stop, you just sort of try to gauge it and shoot on out
there. When you're around that 7:30 area, there is an immense
amount of traffic coming through there, maybe further compli-
cated by Cardiac pacemaker's driveway being immediately
through' there. That's a straight shot from Floral right
straight over to their driveway, so now when an opening does
occur and there's someone coming out of Cardiac Pacemaker,
I've sat there for three, four, five, six minutes waiting
for someone to come and all of a sudden there's a little
21
.
.
,
opening and it's sort of like when two people are walking at
each other - first they both move this way, then that way -
you both start out onto the street and the~ have to stop because
both of you are trying to get out there and go to the south
area there. It really does create a problem and then you
complicate it by doubling that traffic coming there. I think
that's something you really have to take a look at because
that really does create a problem going through there, if that
street comes around through there. Also, if that occurs, at
what point do you have to widen Floral Drive or improve Floral
Drive? I assume if that happens, then that assessment would
immediately come back onto our citizens along Floral Drive.
We're talking about that street being on the developer (in-
audible) .
MR. GREGORY QUARFOTH, 1397 Indian Oaks Court: I have
two small children too, but to me the primary safety issue is
still the intersection on Floral Drive and Hamline. TO me,
there is seclusion in the park, but it is a park, not a play-
ground. I like the seclusion. I just don't think that Floral
and Hamline will take that kind of traffic flow and I just
don't think you can bank on the State saying they'll put a
stop sign up there. I also agree that the traffic problem on
Colleen is bad. I think there should be a stop sign or some-
thing there to help traffic flow along there. But I still
think the primary safety issue is at Floral Drive and Hamline.
It ',s more likely I'll have an accident and kill one of my
kids there than they'll be hurt in the park.
MR. MICHAEL OLSON, 4107 Gale Circle: First of all, I'd
like to know why putting a road through a park makes it safer.
The second thing, has somebody looked at the possibility of
a three way stop up at Colleen? At least they'd get a chance
to legally get out on Hamline. The other thing it would do is
slow down Hamline. Nobody goes 45 miles an hour on Hamline.
That 55 miles an hour from Snelling goes right to 96. It did
wonders at F and Lexington.
MR. CHRISTOFFERSEN: I guess I really can't comment on
that. County Road F and Lexington is a four way stop.
MAYOR WOODBURN: That's where $80,000 worth of semaphores
went in.
MR. OLSON: Well, it helped.
MRS. UDAGER, 4255 Norma: You said no bike riding on
Hamline - how do you get out of Briarknoll and that area if
you can't ride your bike across?
MR. CHRISTOFFERSEN: As far as a stop sign on Hamline
Avenue, I'd just have to take that under consideration and
make recommendations back to the Council.
MAYOR WOODBURN: What does it do to the speed?
22
,
.
MR. CHRISTOFFERSEN: It would probably reduce the speed
when people got used to it. The first initial shock could
create more accidents that you're willing to face. I guess I
really don't know the answer at this time.' ,
MAYOR WOODBURN: Were there several studies quoted out of
your traffic engineer's office, on speed 400 feet from stop
signs? I believe there were. There are several articles out
of traffic engineering studies, actual studies made, that 400
to 500 feet from stop signs, the average speed increased.
People over-speed once they have to stop.
MR. MICHAEL OLSON: At least it would give'them a chance
to get onto Hamline.
MRS. MONICA TUGGL~, 4126 James Circle: Why is everyone
using the Hamline exit? Everyone that works at Land O'Lakes
and Control Data, why can't they go down - a lot of people
work downtown. Do they have to go down Snelling? (Inaudible)
MAYOR WOODBURN: .The traffic is 5300 AnT on Hamline
MRS. NANCY OLSON, 4107 Gale Circle: I just have one
question I'd like to ask. I lived in another area and when
you come to a spot like this where there is so much emotion
and 'everybody wants something, you have to get outside help to
come in and solve the problem. Has that ever been considered?
Even though it cost a little bit, it did help.
MAYOR WOODBURN: We have had three outside people -
consultants - help us on this. We have had our eng1neer, who
is a consultant to us. He's not, the village engineer, as
such, he works for the village - Mr. Christoffersen. We have
had a highway specialist from Short-Elliott tell us about the
traffic flow. We've had our consultant from (inaudible) and
Chapman tell us whether it's good, general planning and maybe
somebody else. We've had 'the fire chief comment to us and
we've had the Ramsey County police comment to us. Anything
else? We have our own internal groups, of course, but as far
as hiring consultants or people that are not working for the
Village, we'd have to pay them.
.
ADELE ANDERSON, Park Department: I have a question about
your last comments. Can you share with us any recommendations
or any of the information that Mr. Christoffersen and the
other planners you mentioned, the other consultants that have
given you information - did they make a recommendation either
way?
MAYOR WOODBURN: They all did. The traffic consultant
merely gave us some figures. Beyond that, Mr. Christoffersen,
would you like to comment on your recommendation from an
engineering viewpoint?
MR. CHRISTOFFERSEN: Based on the length of both Norma
Avenue and Flor~l Drive and considering the input, the traffic
23
.
..
engineer did advise and I made the recommendation that Floral
Drive should be connected to Royal Lane. Based on that recom-
mendation and the length of the cul-de-sacs, one of the things
the traffic engineer stated, in addition to the traffic figures
I read off earlier, was that he did not see any particular in-
crease in the traffic problem - real heavy traffic problems.
There again, traffic engineers look at traffic differently
than a resident would. They're looking at large volumes. As
far as Floral Drive or Colleen Avenue, these two streets are
really not that unusual, although individual people are having
problems. The real problem seems to be - and what I'm hearing
tonight - is Hamline Avenue. Access onto Hamline Avenue - it's
a narrow street. In the future, when Hamline Avenue is up-
graded, I would suspect it would be widened to a point where
people would have 'better access. A good example of that is
Lexington Avenue South. I don't know if any of you have
driven that or had driven it prior to the widening, but just
by the fact of widening Lexington Avenue, it made it much
easier to drive. It made it much easier for people living
by Lexington Avenue to get on and off. There was a lot of
concern about how wide that street was going to be. But it has
proved to be pretty satisfactory to move traffic.
MAYOR WOODBURN: Mrs. Zehm, can you paraphrase for us the
planner's recommendation?
MRS. ZEHM: I don't know if I can paraphrase it, but I
think he recommends pretty strongly that the road connection
be made because of extremely long cul-de-sacs and for the
movement of school buses and fire trucks and police.
MAN IN AUDIENCE: Who is Glen Wormer?
MAYOR WOODBURN: Glen Van Wormer works with Short-Elliott-
Hendrickson. He did work with the State of Minnesota as a
regional traffic engineer. I think he may have been the head
traffic engineer. He's the one that wrote the traffic report.
MAN IN AUDIENCE: Because he says right here that he '
found the traffic did not demand such a connec~ion for effi-
ciency or safety. He also stated that virtually all emergency
service vehicles come from Hamline into the development. The
access is not absolutely needed. That would contradict . . .
MAYOR WOODBURN: There are two reports from him.
MAN IN AUDIENCE: I'm reading the latest one.
ADELE ANDERSON" Park Department: I don't mean to
be picking on Mr. Eibensteiner, but is he planning to pay to
the parks fund the monies that would be necessary to restore
the park, to move the facilities that exist now, to redesign
or whatever we have to do to replan the park, to make it what
we consider somewhat restored and somewhat useful? We do
have a little problem in the front area, conflicting with the
24
.
hard surface court that is there now. We would have to move the
play structure away from the street that would go in there. We
haven't even talked about the amount of land that would be given
to him. We've talked about what he's giving to us, but we
haven't even talked about the acres that we would be giving to
him for the road. How is that going to be resolved?
MR. EIBENSTEINER: Do I have to answer that? I guess at
this time - I'm not in favor of paying for the whole street.
I'd like to pay for a partial street or a partial cul-de-sac.
Other than that, I have no plan to pay for restoration of the
park. That's where I'm at right now.
MRS. SUE HUSTINGS, 4136 Norma Circle: I think the Council
is aware of the fact that Marcel is a businessman, he's been
doing this a long, long time and he's never going to tell you
he's going to give you as much as he expects to give. That is
elementary. What she is saying is that we are giving this.
This is for his use. He is going to get in excess of $30,000
per lot. The difference between him putting in the extra road,
according to your figures, is approximately $29,000, which is a
small percentage of that (inaudible) because of the way he pays
his property taxes (inaudible). He knows where every dollar is
going and I know that you're going to keep that in mind when
you decide what the park dedication will be.
MAYOR WOODBURN: He's a businessman so we intend to give
him the business. Are there any new ideas?
..
MR. MICHAEL OLSON, 4107 Gale Circle: This may not be a
new idea because I'm going to re-emphasize what the person
from Indian Oaks Court said about the primary problem here is
the safety at West Floral Drive and Hamline. That is indeed
the primary problem and I heard from the traffic people here
that it may be resolved when we widen the street. With our
austerity program, I'm not sure that that will ever come,
especially from the state; and I don't believe that Arden Hills
may take it upon themselves to do any widening in the streets.
Again, it's just a re-emphasis of the gentleman from Indian
Oaks. He hit it right on the head. .
MR. DOUGLAS COULL, 1365 Eide Circle: Someone mentioned
that there are emotions involved. This is certainly true. I
came out here because I like it out here. It's quiet, except
for a little rumble from 694. I like that park just exactly
the way it is. My wife and I go walking there, there happens
to be a path for us the way we come from Eide Circle on down
to Floral, without getting run over - we're real careful -
and we enjoy it. I suppose maybe that's not a forward-looking
progressive view, but nevertheless, I like it the way it is -
just the way it is. Secluded or not, it's a delightful park.
I fail to understand how a cul-de-sac is going to improve the
park at all. I'm sympathetic to the gentleman who is expanding
and building out there - that's what keeps the country going.
25
.
,
,
Nevertheless, I want to emphasize that I like it the way it is.
Thank you.
.
MAN IN AUDIENCE: If we're going to get that road crammed
down our throat, has anybody looked at' the possibility of just
ending Royal Oak Development, or whatever it is, right there
and ending Norma Avenue right where those two cul-de-sacs come
across and not have a thoroughfare? We would have a little
increase and they would have a little increase.
MAYOR WOODBURN: I think you're referring to isolating or
cutting off Royal.oaks.
MAN IN AUDIENCE: Have Royal Oaks only going onto Floral
Drive.
MAYOR WOODBURN: In other words, what you're referring to
(Changed Tape) . . .
MR. CHRISTOFFERSEN: ... lengthen the length of the
cul-de-sac street. You're shortening one cul-de-sac and
making Floral Drive longer. If it was cut off right here, this
cul-de-sac street would, in effect, be shorter, but this one
wou+d then be longer.
MAN IN AUDIENCE: Why would it be any longer?
MR. CHRISTOFFERSEN: If it loops through, you do not have
a cul-de-sac. We have short cul-de-sacs along here. This
would be a long dead-end street.
MAN IN AUDIENCE: I would end Norma Avenue right there -
straight across from where that road goes.
MR. CHRISTOFFERSEN: I'm still saying - if this ended
right here, it would still be a long dead-end street from right
here, clear up to there. '
MAN IN AUDIENCE: You could change that lot arrangement.
.
MR. CHRISTOFFERSEN: Because of the terrain on these lots,
the developer has submi tted at least two plans that I am aware
of, to try to develop the area and it's pretty restricted
because it has pretty steep slopes.
MAN IN AUDIENCE: I think it's an alternative to look at
because I think it would make both sides a little happier if
that road has to go through, which I don't think it has to.
MAN IN AUDIENCE: Are there any guidelines for the length
of cul-de-sacs, as it relates to what the Council has used
before or any municipality uses and does this go beyond those
normal guidelines?
26
.
,
.
,
.
COUNCILMAN JOHNSON: Under the Arden Hills code having to
do with subdivisions, under the statement on cul-de-sacs, the
maximum length for cul-de-sac streets shal;L be 500 feet,
measured along the centerline of the intersection of origin to
the end of right-of-way unless there are 18 or less lots
abutting the cul-de-sac. Each cul-de-sac shall be provided
at the closed end with a turn-around having an outside total
diameter of at least 100 feet and a street/property line
diameter of at least 120 feet.
MAN IN AUDIENCE: So this, in fact, is longer than the 500
feet to the right-of-way that is normally prescribed? In the
past, have you deviated within the village of Arden Hills from
that ordinance?
COUNCILMAN JOHNSON: Not under that ordinance,.
COUNCILMAN McALLISTER: Isn't Floral Drive (inaudible)?
COUNCILMAN JOHNSON: Floral was there before the ordinance.
MAYOR WOODBURN: There are deviations, depending on how
you look at it. In other words, two outstanding deviations
are right here (inaudible) except there we built fire lanes
between so they're not true cul-de-sacs. There may be one or
two 'others since this ordinance was passed.
MAN IN AUDIENCE: When was that passed?
MAYOR WOODBURN: Perhaps I should correct myself. I
said since that ordinance was passed - that provision has been
in at least two zoning ordinances that I know of. I don't
know when the first one was passed. It was more than six years
ago.
.
MAN IN AUDIENCE: On~ of the issues from the report from
the consultant did state that final decision regarding the
connection will probably rest with the cost of the connection,
the desirability of eliminating two cul-de-sacs, desirability
of providing alternate access for convenience and emergencies
and the impact on existing plots. I think there he is implying
that the fact that this plan to not connect it through would
give the two long cul-de-sacs. I think that's an issue here,
where there's a safety issue of access for the fire equipment
and for emergency vehicles to get into the new development
and also actually providing better alternate access to Floral
Drive, should there be a problem on Hamline.
MR. JOHN MINER, 4126 Norma Circle: When will you vote
on this? You're discussing this tonight. Does this come up
for a vote at the next Council meeting?
MAYOR WOODBURN: It would be up to the Council to deter-
mine tonight. They could vote on it tonight or they can
postpone it for quite a long period of time.
27
.
"
,
MR. JOHN MINER: There are now four Council members. So
will those four Council members vote on this issue? There
won't be a fifth one added?
tt MAYOR WOODBURN: If it was postponed, it would depend on
how long the postponement was and whether another one was named.
MR. JOHN MINER: If there are four Council members and
the tie is 2-2, it doesn't go?
MAYOR WOODBURN: That's correct. It has to be a majority.
MRS. MONICA TUGGLE, 4126 James Circle: Where does the
fire engine come from? Lake Johanna?
MAYOR WOODBURN: Rice Street or Lake Johanna. If there
is any fire issue, it's not so much getting in as it is getting
trapped once they are in.
MRS. TUGGLE: Okay, I have a question - did they think
of the feasibility of putting a service road along Highway 10
onto old Snelling - a service road alongside 10?
MAYOR WOODBURN: Mr. Christoffersen, is there any possi-
bility of that?
MR. CHRISTOFFERSEN: I wouldn't think there would be a
possibility of a service road adjacent to Highway lO on the
east side because of the steep terrain. It's very steep in
there and it would be very difficult and expensive to build a
service road.
MAYOR WOODBURN: If it's a service road, it's usually
State. Are they building much of anything like this?
MR. CHRISTOFFERSEN: I don't think the State would see
the need for a service road.
MAYOR WOODBURN: I would like, at this time then, to close
the public meeting. If there are any new ideas' that haven't
been discussed, we would like to listen to them, of course.
However, I think that the ,Council has heard a great deal and
if there aren't any new ideas we probably won't have another
public meeting.
.
MR. POPOVICH: Mayor~ by that you mean there wi11 be no
more public "hearings".
MAYOR WOODBURN: I stand well corrected.
MR. POPOVICH: I didn't mean to correct you, but with
the press here and everything . .
MAYOR WOODBURN: All of our meetings are public. The
public hearing is closed and we will take any comments from
28
.
.
.
,
the Council at this time. Any comments or questions?
.
COUNCILMAN HOLLENHORST:
a couple of meetings ago and
the road and in favor of the
I made my feelings on this known
indicated that I was opposed to
cul-de-sac.
MAYOR WOODBURN: Do you have any questions or comments on
specific things?
COUNCILMAN HOLLENHORST: No.
MAYOR WOODBURN: COuncilman McAllister?
COUNCILMAN McALLISTER: Yes, your Honor. I guess I'd
like some clarification. I don't think it's fair to go ahead
and approve this when Marcel can't afford the assessments. I
think we have some things to straighten out on that. I, too,
opposed the road through the park until I began thinking about
Grey Fox Road, where it was so obvious to me that we should
make that connection. If we make that connection, by the same
token I think we should make this connection just from an
engineering point of view. Before I vote for a road through
Floral Park, I would like to make clear in mind how we intend
to pay for it. I'm not sure it's right to put the entire
burden on Marcel, who doesn't really care if there's a road
through the park or not. I would like to get that worked out.
MAYOR WOODBURN: Councilman Johnson, do you have any
comments or questions?
.
COUNCILMAN JOHNSON: Yes. Where do I start? I think
there are people here that probably feel I've made up my mind
and am ready to push the road through, and I'm probably still
in favor of the road, but I think you're here tonight to hear
why. You deserve to know why some of these things - how we
arrive at it. Believe me" it doesn't come easy. I'd like to
address a few things here. First of all, I'd like to address
some planning history that's gone on in Arden Hills. I think
newer residents deserve to know it. I was twelve years on the
Planning Commission watching a lot of this planning go through,
with many frustrations - primarily the frustration that we
weren't making the connections from Hamline to Snelling that
we really wanted because of the individual developments. If
you were to go back to the state aid maps of 1971, you would
find that Floral Road was projected to go through and connect
to Snelling. It was a state aid road. If you were to go to
1975 planning maps, you'd find that Floral Road was still in-
tended to connect through to Snelling Avenue. If you were to
go to the comprehensive plan of 1976 and the state aid map, it
was still there. There have been many of you that have lived
here long before 1976. Then we came up with a comprehensive
plan wherein, under the transportation portion of it, it read,
for thoroughfare systems - the City will encourage new develop-
ment to provide (inaudible) streets, which are sensitive to
29
.
.
,
.
topography and natural features. However, streets must be
reasonably continuous and without excessive dead-ends. There
was a lot of conversation about cul-de-sacs at that time -
from the standpoint of safety. They had many meetings with the
fire chief. That's one of the reasons that cul-de-sacs were
enlarged. We got new fire equipment and the tankers could not
turn around in the conditions that we were planning so we had
to enlarge them. After that, we also considered the ordinance
that we just read to you. The ordinance tells us that we shall
not exceed 500 feet, and yet we're being asked to grant vari-
ances and approve planning. It turns right around and defeats
what we set up in the ordinance. It doesn't make much sense.
We've also visited with our public works people. I asked Bud
to come tonight. It's probably a good thing he didn't. He
wasn't very happy with the work that they've had to do in the
last couple of weeks. We have 46 cul-de-sacs in our City, with-
out counting the additional cul-de-sacs now planned in the
Royal Hills development.
On a cost basis, he will plow approximately one-half to
one mile of straight roads for every cul-de-sac he has to plow.
Right now he says that if we get another big snow, there are
cul-de-sacs where he doesn't even know where he'll put the snow.
Nor does he have any assurance that some of these bigger emer-
gency vehicles, once they're in, can turn around and get back
out., To follow that up, I have met with the Ramsey County
Sheriff's Department, since I'm working directly in the public
safety area, and have patrolled those streets during these
storms during the last two weeks on about three or four nights.
We know how they're filling up. I've simply asked the police
for their feelings on where we would (inaudible) or what we
would do. One answers - you'd probably panic. They definitely
- and they can't reinforce it strongly enough - request that we
seriously consider through streets for the purposes of ease of
patrolling since cul-de-sacs, to them, both from snow and a
safety standpoint, are a problem. It's not uncommon to see
cul-de-sacs patrolled half the time that through streets are
patrolled. From the standpoint of fire, to be very honest, with
you, they were not as concerned about the turn-around aspects
during the fair weather and during the weather as it is right
now, unless it becomes somewhat worse than it is. They're
concerned about holding the pumpers at some distance so that
they could back up safely.
.
These are some of the things that we've looked at, from
the standpoint of a through street. I've also looked very
closely at that intersection of Floral and Hamline., I'm in
100% agreement with those who are concerned about getting out
there. I've been out there at 7:00 in the morning, I've sat
in the driveway, backed up to Cardiac Pacemaker, and watched
those of you try to sneak out. There are some visibility prob-
lems. Hamline Avenue has been a headache for us for a long
time. As you know, we tried to do something about it some
time back, and failed. I think that if we were to proceed
30
.
,
.
.
with the road going through, that we have to look at Hamline
parallel to this project. Not only from the standpoint of
Floral, but also from the standpoint of Colleen. Colleen has
its share of problems too. I don't think that I'm ready to make
a vote tonight, because I think if I was to vote I would have
contingencies on it that probably would hold up the vote. I
guess I'd like to be able to look closer at these contingencies
before making a decision.
COUNCILMAN McALLISTER: A contingency - for instance, a
right turn lane or something like that?
COUNCILMAN JOHNSON: Yes. I'm not at all sure that we
can't talk to the State about traffic control on Floral and
Hamline. We've heard this story on Snelling and Hamline years
ago. We've learned some lessons on Hamline and 51. I'm not
convinced that we can't accomplish something else.
MAYOR WOODBURN: Do you think, within the time frame that
we're allowed to approve or disapprove this, that we could
accomplish something or find out if any of these changes on
Hamline are possible?
COUNCILMAN JOHNSON: What's our time frame?
,MAYOR WOODBURN: We're beyond it now, for approval of the
preliminary plat. Based on what I see going on, the way
property is selling, I don't think that the developer is going
to be in too much of a panic to get out there and put signs up.
Do you agree?
MR. MARCEL EIBENSTEINER: I ,agree.
COUNCILMAN JOHNSON: I think we have a number of things
that should really be looked at parallel with this. I've been
frustrated with this development since eight years ago.
MAYOR WOODBURN: Mrs. Zehm, what is the time limit that
we are required to approve or disapprove this?
MRS. ZEHM: It was 60 days, I believe.
MAYOR WOODBURN: We're required to act on it after 60 days?
MRS. ZEHM: Yes. I can look it up;
.
COUNCILMAN JOHNSON: While she's doing that, I'll bring
up another area here that has to do with the park. I can
appreciate the concern of the Park Committee of losing the
land and believe me, they're an aggressive bunch. I was just
wondering - we may not be able to do so much with the land it-
self, but if monies could be someway transferred back to the
Park Committee - I heard from the representatives of Colleen
earlier that they, in turn, may be helpful in helping with some
of the costs. If they have a problem in the assessment rolls
31
.
,
, .'
..
for the particular development at hand, it is possible that they
might be interested in helping the Park Committee - some way of
reimbursing the park for the loss of its land? That may be a
. possibility.
MRS. ZEHM: It's 30 days after receipt of the Planning Com-
mission report.
MAYOR WOODBURN: Although classically, if no objection is
forthcoming from the developer, we have taken longer than that.
MRS. ZEHM: Right.
COUNCILMAN JOHNSON: I'd like to ask Don a question, or
Marcel, relative to (inaudible). Marcel, you indicated that
you obviously want to get rid of some of the storm sewer that
runs on Royal Lane.
MR. MARCEL EIBENSTEINER: Right.
COUNCILMAN JOHNSON: That, topography-wise, is about a 20
foot drop?
MR. EIBENSTEINER: Twenty .feet from the east side to the
intersection.
COUNCILMAN JOHNSON: I don't know what the percentage
would be, but are you of the thinking that you could delete the
underground work, let that water run at the curbs down to
Norma Avenue?
MR. EIBENSTEINER: Right. Down to the intersection.
COUNCILMAN JOHNSON: Have you established or determined
what the velocity of the water would be as it leaves the park
area and what it would be doing as it reaches Norma Avenue?
.
MR. EIBENSTEINER: No. All I've done - I've talked t9
an engineer - I didn't tell him who was doing the work here
I just showed him what the problem is and aske& if I could
eliminate the pipe in the street and have a catch basin at the
bottom of the intersection. He said he could figure it out
and about a half hour later he said yes, there would be no
problem. In fact, he suggested we could even go a hundred feet
further. I can understand your concern. Your concern is that
the water would be coming down the hill at such a high velocity
- so we'd have a catch basin half way between the hill and
the intersection and another one at the bottom of the inter-
section. I guess I can buy that.
COUNCILMAN JOHNSON: I guess I'd like to have Don at
least comment about that. If I'm way off in left field, tell
me, but when I look at a 20 foot drop in that distance, it
seems to me that it's going to be a little difficult to pick
that water up in a surface-type catch basin.
32
, ,
"
'~'
.'
.
..
MR. CHRISTOFFERSEN: (Changed Tape) . . . four or five
acres of land draining at that point. The rule of thumb is one
cubic foot per second per acre. Another ~ule of thumb is two
cubic feet per second for the storm sewer. It appears to me
that at least half way up the road we would need some storm
sewer. At least up to this point right here, for some pick-up,
because we have approximately four c.f.s. - two c.f.s. (in-
audible). Obviously, for the purpose of the report, we put in
the storm sewer - the maximum amount that would be required
rather than the minimum amount. Obviously, if later on we find
out that we need more storm sewer and we didn't have it in the
hearing cost, we'd have to have another hearing. So we put the
cost in on top and work away from that if we can. It's my
opinion that storm sewers should go at least half way up, if
not three-quarters of the way up that hill, to pick up some of
that water draining down to the park. We can't solve the
drainage of that little low area of the park and recommend that
we (inaudible) right into that low area (inaudible) so it
doesn't overflow into the street. It's better to pick it up
a little bit at a time rather than all at once.
MAYOR WOODBURN: Don, would you reaffirm or clarify that
the pond level will not be changed, either way, whether the
water sheets down the road or whether it has been picked up
by storm drainage.
MR. CHRISTOFFERSEN: If the road grades could be set to
where they're below the pond level - I'm not sure whether it
would hold water for a great deal of time or not, I'm not that
familiar with it - but it shows up on the contour, map as a
low, isolated area that holds water, at least during a rain
storm. I don't know if it holds' it all the time or not. If
the water could be allowed to run across the curb without
ponding, then I think we need the storm sewer at least half to
three-quarters of the way up the road. However, if there is
a pond - if it does hold water - I would say we would be
working with the bottom of the current low level - to drain
that and keep it at a normal level. If there is water in'
there and it stands there the whole year round.- if it's
cat-tail, marshy land and the City wishes to keep it as such -
I would just recommend keeping it at its normal level, to
where it would remain as such. If it's a piece of land that
can be filled in and leaves the low level without disturbing
the trees or any heavy vegetation, I would say that could also
be done without appreciably damaging the property. Either
way, I think you could make it work.
MAYOR WOODBURN: So it can be developed without any
change in vegetation or trees, from what is presently there?
MR. CHRISTOFFERSEN: That's my feeling. I think it may
require a storm sewer to the park.
MAYOR WOODBURN: But it can be done and that's what we
wanted to clarify. To me, it's kind of unfortunate that this
has become - this feasibility study has become inexplicably
33
.
..
" ..
....
.
.
entwined with' the platting, but it had to in this case, when
we're discussing a large amount of platting here as well as the
feasibility. With respect to the feasibility, from what I've
heard here, it's money. It would seem to me that this study
benefits the property that would be platted and perhaps some
other lots and, therefore, if it's done in this way, we should
be told whether it's feasible or not by the engineer and the
developer because the improvements are for the plat and not
for anything else. If there is a road to be put through the
park, it has to benefit the park. If it thereby becomes un-
feasible, then our question here tonight is moot. We should
find that out at some meeting - I think that meeting should be
very shortly in the future. I agree that we should consider
what we've heard here tonight. If we have our minds made up
before a public hearing, then there's no use having the public
hearing. After considering everything, come back and dispose
of the issue one way or the other. 'If this should be - as I've
heard expressed - the wish of the Council, we could accomplish
that by tabling this until a definite time, at which time we
will reconsider the feasibility. Is that the wish of the
Council? Or do you wish to proceed at this point? If we pro-
ceed at this point, the first necessity would be approving
the plat.
COUNCILMAN McALLISTER: I have one question for Marcel.
What did you say the maximum assessment per lot was that you
could live wi th?
MR. EIBENSTEINER: I could live with $11,OOO, but to
answer the Mayor's comment, I would just as soon table this
for this evening and bring it up at the next Council meeting
and at that time make a decision.
MAYOR WOODBURN: There's been a request by Mr. Eibensteiner
for a little more time. What is the Council's wish? Entertain
a motion or any further discussion?
Councilman McAllister moved that the Council table its
action on Improvement No. SS-W-P-ST-81-5 (Roya~ Hills Plat)
until the Council's next regular meeting on February 8, 1982.
Councilman Hollenhorst seconded the motion, which carried
unanimously (4-0).
34
"
,;;, 4
..'t<
.
.
STATE OF MINNESOTA )
) SS
COUNTY OF RAMSEY )
I, the undersigned, being the duly qualified and acting
Clerk Administrator of the City of Arden Hills, Ramsey County,
Minnesota, hereby certify that I have carefully compared the
attached and foregoing extract of minutes of a special
meeting of the City Council of said City held on the date
therein indicated with the original of said minutes on file
in my office and that said extract is a full, true and correct
transcript of said minutes, insofar as they relate to the
proposed construction of Improvement No. SS-W-P-ST-81-5
under and pursuant to Minnesota Statutes, Chapter 429, as
amended.
WITNESS MY HAND and the seal of said City this /~a
day of February, 1982.
94~~
C~ ty Cler A rator
(SEAL)