Loading...
HomeMy WebLinkAbout2000-09-21 Agenda • CITY OF ARDEN HILLS Operations & Finance Committee Meeting Agenda Thursday, September 21, 2000 at 7:00 p.m. Arden Hills City Hall, 4364 West Round Lake Road 1. Call to Order 2. Roll Call 3. Approval of minutes from the August 17, NM meeting. 4. Old Business: A. City Entry Signs (may be tabled due to long agenda) B. Review of the new City Hall issues with Mayor Probst • What brought us to this point • Who had input • Cost analysis lease verses buy/build • Design review (plan will be available) C. LGA and HACA funding for cities • • City Accountant, Terry Post, will explain charts included in last months packets. 5. New Business: A. City streetlight charge for the Operations &Finance Committee (see attached memo) 6. Staff Update 7. Council Update 8. Other Business 9. Next Meeting Date 10. Adjournment Please contact Pam at (651) 633-5676 if you are unable to attend this meeting. • • CITY OF ARDEN HILLS Operations & Finance Committee Minutes Thursday,August 17, 2000 Arden Hills City Hall, 4364 West Round Lake Road Called to order at 7:00 p.m. Members present: Mark Kelliher, Ray McGraw, Chuck Mertensotto, Terry Nygaard, Dwayne Stafford and Lois Rem. Cy;Kx SToopp o Approval of July 20, 2000 minutes. General discussion: • Early entry to TCAAP • Site prep and etc. • Building proposed cost • Entry signs—cost and styles • • Dwayne Stafford to decide informative sign installation • Other signs to be decided by Resident Petitions • Chair, Mark Kelliher, to ask the Mayor to attend the next meeting on Thursday, September 21, 2000. Adjourned at 9:03 p.m. QQ.e,R6SW yr • • CITY OF ARDEN HILLS MEMORANDUM DATE: September 6, 2000 TO: Operations & Finance Committee Members FROM: Dwayne Stafford, Public Works Director SUBJECT: County Road E Street Lights Background On July 7, 2000, during a brief thunderstorm, one of the City owned streetlights on County Road E blew down smashing the light fixture, but fortunately not causing any other damage. Upon inspection of the lightpole by City employees and a factory representative, it was clear that the pole and many of the others are rusting off at their base from de-icing chemicals and moisture. The concrete bases the poles sit on compound the problem because their tops are sitting below the finished grade of the surrounding area. Temporary Fix The City Council authorized staff to hire Boe Ornamental Iron of Lino Lakes, to fabricate • and install a reinforcing collar around the base of sixteen suspect lightpoles at a cost of $3100. Permanent Fix The Public Works Director has talked with Peoples Electric of St. Paul, a major outdoor lighting installer, and discussed ways to extend the existing concrete mounting bases to provide for a proper above ground mount, without removing the existing bases and wiring. We feel we have a solution for this that the Public Works Director will explain at the September Operations &Finance Committee Meeting. Operations & Finance Committee Project The City Council has agreed with the Public Works Director that we will ask the Operations &Finance Committee to research various designs of street lightpoles and fixtures. The committee will choose designs appropriate to replace the lighting on County Road E, and also a similar design, on a smaller scale, that could be used in residential areas in the future if so desired. It would be the charge of the Operations &Finance Committee to provide two or three acceptable designs to the City Planning Commission. The two committees/commissions would then make a final selection to recommend to the City Council. If approved the City would then contract out to have the existing street lightpoles and • fixtures on County Road E replaced in early 2001, in time for the City's Fiftieth Anniversary Celebration. Staff will help get the project moving by providing available catalogs. "5;1/4 -'-' A 1 c-, _ f\b‘n \\,e • ;t �-v,,l n i ��. 1a�,,,. ° (cn � 40,E x• 2 L ,G ` �`\I, r ,�, .'` le.cv�p� I '6 .., (,,,,, tit\,,,,, ;,Z,./� \‘.\\ ...leek\ 131 0 x,, 4F U OVAti �-° (off- �v„sg ,}s 1..3.'lli ,;k) oc- <> ›.„1----- 5. • 0.1 ,k 33 9i: `. IV Y • k3sxm3,1-)() \TA c)\ �� S C St %) . j CIA &y7 41‘1\DArn)-7 car LLC:4) sl tt 6 '-00 \c , C,i t L t� J 3 , Q V\‘,0 ei,.. 0v ;- E c.1 rr )4L (_ kg 5 R_ AN r9e,`?)92- J 1')W v�i i t. b fc 1 2L-12X0 >N rof (�) 0g tz • C_ St' \ 10 ia5 Ake \0 ,31-v sc- rn i 1rt' �' �` fir`` /1-E. A(1,N) u.r (E c,Od% • P• City of Arden Hi' • City Hall Lease Cost Analysis 2001 - 2030 lease rev 082900 IPPIIIIMUIOONNMOIEIRNWIBEMMIGIIIIBMMOKNOOWEIEMWIINIIVMKEIIIUIIFOMIOII VINOSNERMAXERKetainititaiNatiOMINGENVIENNIMMENIMaiheitinehaMil 2001 $3,460,233 $173,012 $12.30 10,320 $126,936 $46,076 $3,506,309 2002 3,506,309 175,315 12.67 10,320 130,744 44,571 3,550,880 2003 3,550,880 177,544 13.05 10,320 134,666 42,878 3,593,758 2004 3,593,758 179,688 13.44 10,320 138,706 40,981 3,634,739 2005 3,634,739 181,737 13.84 10,320 142,868 38,869 3,673,608 2006 3,673,608 183,680 14.26 15,320 218,449 (34,769) 3,638,840 2007 3,638,840 181,942 14.69 15,320 225,002 (43,060) 3,595,779 2008 3,595,779 179,789 15.13 15,320 231,753 (51,964) 3,543,816 2009 3,543,816 177,191 15.58 15,320 238,705 (61,514) 3,482,302 2010 3,482,302 174,115 16.05 15,320 245,866 (71,751) 3,410,550 2011 3,410,550 170,528 16.53 15,320 253,242 (82,715) 3,327,836 2012 3,327,836 166,392 17.03 15,320 260,839 (94,448) 3,233,388 2013 3,233,388 161,669 17.54 15,320 268,665 (106,995) 3,126,393 2014 3,126,393 156,320 18.06 15,320 276,725 (120,405) 3,005,988 2015 3,005,988 150,299 18.60 15,320 285,026 (134,727) 2,871,261 2016 2,871,261 143,563 19.16 15,320 293,577 (150,014) 2,721,247 2017 2,721,247 136,062 19.74 15,320 302,384 (166,322) 2,554,925 2018 2,554,925 127,746 20.33 15,320 311,456 (183,710) 2,371,215 2019 2,371,215 118,561 20.94 15,320 320,800 (202,239) 2,168,976 2020 2,168,976 108,449 21.57 15,320 330,424 (221,975) 1,947,001 2021 1,947,001 97,350 22.22 15,320 340,336 (242,986) 1,704,015 2022 1,704,015 85,201 22.88 15,320 350,546 (265,346) 1,438,669 2023 ' 1,438,669 71,933 23.57 15,320 361,063 (289,129) 1,149,540 2024 1,149,540 57,477 24.28 15,320 371,895 (314,418) 835,122 2025 835,122 41,756 _ 25.00 15,320 383,052 (341,295) 493,826 2026 493,826_ 24,691 25.75 15,320 394,543 (369,852) 123,974 2027 123,974 6,199 26.53 15,320 406,379 (400,181) (276,206) 2028 (276,206) 0 27.32 15,320 418,571 (418,571) (694,777) 2029 (694,777) 0 28.14 15,320 431,128 (431,128) (1,125,905) 2030 (1,125,905) 0 28.99 15,320 444,062 (444,062) (1,569,967) me interest return factor fit 5%%. e rent 00000 at. per year.