HomeMy WebLinkAbout10-06-2025 JDA Work Session Packet
Joint Development Authority
TCAAP Redevelopment Project
Joint Development Authority
TCAAP Redevelopment Project
JDA WORK SESSION AGENDA
Monday, October 6, 2025, 5:30 p.m. at Arden Hills City Hall
1. Roll Call
2. Public Input
3. New Business
a. Rice Creek Boulevard Infrastructure Improvements Update
b. Review Sustainability Information Session Presentation
c. Communications Update
d. Review Road Map
4. Administrative Director’s Report
5. Development Director’s Report
6. Commissioner Updates
7. Adjournment
Joint Development Authority
TCAAP Redevelopment Project
Joint Development Authority
TCAAP Redevelopment Project
AGENDA ITEM 2
MEMORANDUM
DATE: October 6, 2025
TO: Joint Development Authority Board of Commissioners
FROM: Directors Mitchell and Jagoe
SUBJECT: Public Input
The public is invited to provide input. Comments will be limited to three minutes per person.
Joint Development Authority
TCAAP Redevelopment Project
Joint Development Authority
TCAAP Redevelopment Project
AGENDA ITEM 3a
MEMORANDUM
DATE: October 6, 2025
TO: Joint Development Authority Board of Commissioners
FROM: Larina DeWalt and John Mazzitello, Ramsey County
SUBJECT: Rice Creek Boulevard Infrastructure Improvements Update
Following the approval of the plat for Rice Creek Boulevard (formerly known as the spine road) at the
September JDA meeting, Ramsey County staff and consultants with Kimley Horn will provide an
overview of the schedule, plans, and regulatory agency coordination for public infrastructure
improvements.
Attachments:
• Presentation: Rice Creek Boulevard Infrastructure Improvements Update
• Rice Creek Boulevard Roadway Plan and Profile Layout
RICE CREEK BOULEVARD - INFRASTRUCTURE
IMPROVEMENTS UPDATE
JOINT DEVELOPMENT AUTHORITY
WORK SESSION MEETING
OCTOBER 6TH, 2025
Project Overview/Schedule
Final Design Contract Start – July 2024
60% Submittal – February 2025
90% Submittal – January 2026*
100% Submittal – April 2026*
Advertisement/Bidding/Awarding Project for Construction – May/June 2026*
Start of Construction – Summer 2026*
Construction Complete – Fall 2027*
*Projected Dates
Rice Creek Boulevard Overview
Intersection Control/Roadway Geometry
Roundabouts at Town Center entrances
and southern full access
Signal upgrades at County Road 96
5-Lane/3-Lane Transition
Based on updated traffic study
Bridge Overpass at Rice Creek
Roadway Typical Section
Multimodal Project Elements
Shared Use Paths – 10ft wide
Bikeable Shoulders
Pedestrian Refuge islands
Raised Crossings
Rest Areas/Seating
Pedestrian Refuge Islands
Public and Private Utilities
Sanitary Lift Station – Onsite
Water Booster Station – Offset
Private Utility Corridors/Coordination
Utility Typical Section
District Energy Corridor
Public Utilities (Water,
Sanitary, Storm)
Future Turn Lane
or Bus Lane
Station
CSAH 4 - Rice Creek Boulevard
EF1
Rice Creek Crossing and Regional Trail
Perimeter Trail
Bridge Crossing
Natural Resource Corridor/Stormwater
Public Ponds and Wetlands Establishment
Stormwater Receiving Waterers
Rice Creek
Round Lake
Rice Creek Trail Connection Flood Mitigation
Environmental – Protected Species
SPECIES AVOIDANCE WINDOWS
Regulatory Agency Coordination
US Army
TGRS Relocations/Modification
Round Lake Remediation
PFAS Screening
MPCA/EPA
PFAS Screening
Response Action Plan
Dewatering Plans
Stormwater Management/SWPPP
DNR
Protected Species Permitting
Rice Creek Rate Control
Dewatering Plans
Rice Creek Watershed District
Stormwater Treatment
Rice Creek Compensatory Storage
Erosion Control/SWPPP
Questions?
B B
P P
P P
P P
P P
P
P
P
PP
P
P
P
RETAINING
WALL
RO
W
1
5
0
'
RO
W
1
4
0
'
RO
W
1
4
0
'
RO
W
1
3
0
'
R
O
W
1
5
0
'
R
O
W
1
4
0
'
5'13'
7'
13'
11'
11'
5'
18'
10'
14.
5
'
8
'
RO
W
1
4
0
'
RO
W
1
4
0
'
RO
W
1
3
0
'
RO
W
1
4
0
'
R
O
W
1
4
0
'
7'
1
0
'
2
9
'
5
'
1
3
'
1
8
'
1
3
'
5
'
2
9
'
1
0
'
10
'
29'
18'
5'
29'
10'
4
'
4
'
10
'
29
'
5'
13
'
12
.
5
'
11
'
29
'
10
'
4'
4'
7.
5
'
10
'
29
'
5'
11
'
7.
5
'
13
'
5'
29
'
10
'
4'
4'
12
.
5
'
10
'
29
'
5'
13
'
13
'
5'
29
'
10
'
4'
4'
18
'
10
'
29
'
5'
13
'
12
.
5
'
11
'
5'
29
'
10
'
4'
4'
7.
5
'
10
'
29
'
5'
11
'
7.
5
'
13
'
5'
29
'
10
'
4'
4'
12
.
'
5
13
'
4'
4'
28'
13'
13'
28'
10
'
10
'
10'
17'
13'
13'
17'
10'
5'
10'
10'
17
'
5'
11
'
13
'
11
'
18
'
10
'
5'
10
'
13
'
11'
11'
FORMER
BUILDING 502
SITE I
MANIFOLD
BUILDING
SITE K
OUTLOT F
OUTLOT G
OUTLOT E
OUTLOT H
OUTLOT I
OUTLOT J
OUTLOT K
OUTLOT L
OUTLOT D
13'
5'
5'
5'
5'
19
'
10
'
29
'
5'
13
'
4'
14
'
5'
13
'
5'
29
'
10
'
7'
1
0
'
2
9
'
5
'
1
3
'
1
9
'
1
3
'
5
'
2
9
'
1
0
'
8
'
2
0
'
21
'
19'
21
'
1
9
'
20'
19'
20
'
22
'
22'
1
0
'
2
9
'
5'
1
3
'
1
8
'
1
3
'
5'
2
9
'
1
0
'
4'
4'
22'
18'
20
'
1
8
'
18'
18'
23
'
1
8
'
19'
22
'
18'
1
8
'
13
'
16
'
13'
19'
18'
1
8
'
13
'
14
'
13'
17'
2
2
'
2
2
'
RICE CREEK
REGIONAL TRAIL
CONNECTION
4'
4'
4'
4'
4'
4'
5'
RETAINING
WALL
RETAINING
WALL
TRAFFIC SIGNAL AND TURN
LANE IMPROVEMENTS
RAISED GRADE CROSSING
RAISED GRADE CROSSING
RICE CREEK
REGIONAL TRAIL
CONNECTION
RICE CREEK
REGIONAL TRAIL
CONNECTION
100 YR 10-DAY
HWL: 833.05'
100 YR 24-HR
HWL: 878.92'
10 YR 24 HR
HWL: 875.75'
100 YR 10-DAY
HWL: 833.05'
100 YR 24-HR
HWL: 878.92'
10 YR 24 HR
HWL: 875.75'
13.0'
LANE
5.0'
SHLDR
10.0'
BIT. SHARED USE PATH
29.0'
BLVD
10.0'
BIT. SHARED USE PATH
13.0'
LANE
4.0'4.0'5.0'
SHLDR
2.0'
CONC.
MAINTENANCE
EDGE
2.0'
CONC.
MAINTENANCE
EDGE
29.0'
BLVD
12.0'
PRIVATE UTILITY
CORRIDOR
10.0'
PRIVATE UTILITY
CORRIDOR
70.0'70.0'
140.0'
18.0'
MEDIAN
2.0'
CONC.
MAINTENANCE
EDGE
2.0'
CONC.
MAINTENANCE
EDGE
RICE CREEK COMMONS
ROADWAY PLAN AND PROFILE LAYOUT
October 2025
NO
R
T
H
Joint Development Authority
TCAAP Redevelopment Project
Joint Development Authority
TCAAP Redevelopment Project
AGENDA ITEM 3b
MEMORANDUM
DATE: October 6, 2025
TO: Joint Development Authority Board of Commissioners
FROM: Director Mitchell and Rick Carter, LHB
SUBJECT: Review Sustainability Information Session Presentation
A draft slideshow for the Sustainability Information Session is provided for feedback from the JDA. After
getting feedback from the JDA, staff will make edits, refine existing content, and clean up formatting.
Early November is targeted for this virtual info session due to schedules and to allow time for
promotion.
Attachment:
•Rice Creek Commons Sustainability Information Session Presentation Draft
ever-greenenergy.com
Rice Creek Commons
Sustainability Information Session
November 2025
ever-greenenergy.com
Agenda
3:00 -3:05 –Introductions/Agenda
3:05-3:10 –Energy Vision and History
3:10-3:20 –Clean Energy Analysis
3:20-3:25 –LEED for Communities
3:25-3:30 –Sustainability Design Guidelines
3:30-3:35 –Cost Benefit Analysis
3:35-3:45 –Questions and Discussion
ever-greenenergy.com
Energy Vision and History
ever-greenenergy.com
Green Energy Vision
Rice Creek Commons will be a vibrant and unique, climate-forward development that aligns with the goals outlined in the
State of Minnesota’s Climate Action Framework: carbon neutrality, clean energy, climate resiliency, equity and
innovation. Rice Creek Commons will attract investment and partnership that will create sustainable benefits for the
community.
GUIDING PRINCIPLES
•Develop a resilient community for energy and other utilities using clean energy technologies, reducing
consumption, and reusing local resources onsite.
•Implement infrastructure solutions that are flexible and scalable over 50 years, including developing the site to be
adaptable to future technological needs.
•Deliver a model of efficient energy and water usage that minimizes Rice Creek Commons’ impact on the
environment.
•Create an economically competitive and attractive environment for developers and businesses to create a vibrant
community with multi-modal transportation options.
POLICY STATEMENT: Rice Creek Commons seeks to be an all-electric, carbon-free development
ever-greenenergy.com
Goal Review
RICE CREEK
COMMONS…
Is walkable and sustainable within itself.
Achieves ambitious goals without pricing itself out of the market.
Is the model for communities across the U.S.
Inspires others.
Is financially viable for the City/County.
ever-greenenergy.com
What does a sustainable community look like?
ever-greenenergy.com
What does a carbon-free community look like?
ever-greenenergy.com
Sustainability Strategies Underway at RCC
TCAAP Redevelopment Code (TRC) in place to guide overall community
Planning for ground-source district energy system
Sustainability Design Guidelines in place to guide individual buildings
Pursuing LEED for Communities certification
How did we get here?
ever-greenenergy.com
History
2014: JDA established the Environmental Resiliency Advisory Board (ERAB), which defined the
original Energy Vision
2015: Energy Integration and Resiliency Framework (EIRF) created, which set a vision of RCC as the
largest net-zero energy redevelopment in the state
2016: JDA created the TCAAP Redevelopment Code (TRC), which lays out the land uses for the site
including high-quality bike and pedestrian infrastructure
2023: Energy Advisory Committee (EAC) convened to carry on the work of the ERAB. They refreshed
the Green Energy Vision and directed staff to engage consultants to support this work.
2024: Consultants Ever-Green Energy (EGE) and LHB worked with the JDA to analyze RCC and
recommend sustainability strategies and policies focus of today’s presentation
2025: First project on RCC breaks ground, following the JDA’s Sustainability Design Guidelines
ever-greenenergy.com
Clean Energy Analysis
ever-greenenergy.com
Energy Model of RCC
EGE modeled a conceptual development based
on the TCAAP Redevelopment Code (TRC)
This model found that under a business-as-
usual scenario, annually the development
would use 325,000 MMBtu of energy
To meet those energy needs, the JDA must
implement both demand- and supply-side
strategies
ever-greenenergy.com
Green Energy Strategies
Demand-side strategies: reduce energy consumption
•High-performance building design
Supply-side strategies: provide carbon-free energy
•Eliminate fossil fuels: no or minimal natural gas
•Heating and cooling: ground-source energy
•Electrical generation: solar photovoltaic (PV)
•Purchasing renewable electricity from Xcel: Renewable Connect
•Others
ever-greenenergy.com
Reducing energy use in buildings
Baseline Buildings
•Meet current Minnesota energy code
•Natural gas and electricity
•Heating and cooling makes up about three-
quarters of total building energy use.
High-Performance Buildings
•All electric
•High-performance envelopes, lighting, and
equipment
•Nearly half of the energy used is for heating and
cooling.
High-performance buildings reduce energy
use by 62%
Decarbonizing heating/cooling is critical
Annual Energy Use Estimates for RCC Buildings (Community-Wide)
ever-greenenergy.com
How will RCC meet energy needs?
Provide carbon-free energy through a combination of:
•Geothermal / ground-source: thermal energy (heating/cooling) through a
combination of district energy and individual building geothermal
•Solar: onsite rooftop photovoltaic panels
•Xcel Renewable Connect: purchase electricity from Xcel that comes from
offsite solar or wind
ever-greenenergy.com
District energy is an efficient option for thermal energy
District energy - sometimes called community energy or thermal energy network
System provides a shared source for heating and cooling buildings – efficiency
Three major components:
•Distribution loop: water is circulated through an underground loop at a constant temperature
•Building connections: water source heat pumps and/or variable refrigerant flow systems (VRF) connect individual buildings to the loop
•Thermal energy solutions: source(s) that keep the water loop temperature at ~55°F
ever-greenenergy.com
Three thermal energy scenarios were analyzed
1.District Energy – Entire Development
2.District Energy – Town Center: serves the densest portion of site (over half of energy load)
3.Decentralized Geothermal: each building has its own individual geothermal wells
Analyzed each scenario on greenhouse gas (GHG) emissions reduction and cost
Scenario 2 emerged as the best path forward
A district energy system would:
•Improve efficiency by sharing heating and cooling energy between buildings
•Allow the use of heating and cooling equipment familiar to developers, operators, and contractors
•Require less in-building equipment
•Enable higher equipment efficiencies
•Eliminate cold weather equipment packages
•Eliminate air source condenser units (frees up roof space for solar)
ever-greenenergy.com
LEED for Communities Certification
Several certification systems analyzed for fit with RCC – LEED for
Communities recommended
LEED for Communities:
•Administered by the US Green Building Council / Green Business Certification Institute (GBCI)
•For use in planning stage of a new community
•Data-driven, comprehensive system addressing natural systems, transportation, water, energy, GHG reduction,
materials, resources, quality of life
Note: Differs from LEED Building Design + Construction (BD+C)
•For use during design and construction of a new building, certified post-occupancy
•LEED for Communities gives points for LEED BD+C certification
•Colloquially, this is often what people mean when they refer to LEED
Certification System: LEED for Communities
How LEED for Communities Helps Push Sustainability
Requirements for:
•Providing public access to green space/wetlands
•Including an organics collections service
Pursuing optional points for:
•Certifying buildings to LEED
•Reducing light pollution
•Including pedestrian and bike infrastructure
•Employing strategies to reduce travel by individual car
•Designing to reduce GHG emissions
•Including on-site renewable energy generation
•Participating in utility demand-response programs
•Designing paving with recycled content
•Employing outdoor air quality monitoring and other
health/wellbeing strategies
LEED for Communities Scorecard
ever-greenenergy.com
Sustainability Design Guidelines
ever-greenenergy.com
Sustainability Design Guidelines (SDG)
Provide clear, concrete requirements for each individual development
Developers following these guidelines is largely how we achieve the overall
sustainability goals for the community
Provide a way for the JDA to track compliance with sustainability goals
Include a waiver process, so that developers can request changes from the JDA on a
case-by-case basis
ever-greenenergy.com
Sustainability Design Guidelines Summary
Sustainability Certification: buildings must be certified at LEED BD+C New Construction Silver or
above, or similar certification system
Energy Efficiency: buildings must achieve 50% better energy efficiency than Minnesota Energy Code
Decarbonization:
•Electrification: buildings must be all-electric.
•Renewable Energy: buildings must install rooftop photovoltaic (PV) systems
•District Energy: if available, buildings must connect to district energy for heating and cooling.
Embodied Carbon: buildings must conduct a whole building life-cycle assessment and achieve at
least a 10% reduction in global warming potential
Electric Vehicle Chargers: EV equipment must be installed, requirement varies by building type
Reporting
ever-greenenergy.com
Cost Benefit Analysis
ever-greenenergy.com
Cost Benefit Analysis Examples
[PLACEHOLDER SLIDE – WILL ADD EXAMPLES]
Discuss the cost benefit of meeting the SDGs
•Use of IRA funding for up to 50% off the entire GSHP and PV systems
•Changes based on changes to the IRA by current administration
•Energy use reductions
•GHG emissions reductions.
•Cost reductions
ever-greenenergy.com
Summary
ever-greenenergy.com
Summary: RCC Sustainability Status Fall 2025
District Energy
•Plans advancing, funded by a Geothermal Planning Grant from the Minnesota Department of Commerce
•Decisions yet to be made on size of system and organizational structure
LEED for Communities
•Precertification at the Platinum level submitted October 2025
•Certification planned for late 2026
Sustainability Design Guidelines
•Approved in January 2025, lightly revised for clarity in September 2025
ever-greenenergy.com
Questions
Joint Development Authority
TCAAP Redevelopment Project
Joint Development Authority
TCAAP Redevelopment Project
AGENDA ITEM 3c
MEMORANDUM
DATE: October 6, 2025
TO: Joint Development Authority Board of Commissioners
FROM: Allison Winters and Sara Swenson, Goff Public
SUBJECT: Communications Update
Goff Public worked with Ramsey County to prepare and distribute the fall Rice Creek Commons
newsletter. The newsletter was sent to 3,398 subscribers on Monday, September 29. Topics included
the release of the Request for Information, the approval of the plat for Rice Creek Boulevard, and a
construction update on Outlot A. The newsletter had a 2% click rate and 19% open rate, which is similar
to the last newsletter.
There have been three recent inquiries through the Rice Creek Commons microsite contact portal on
topics including opportunities for development, plans for senior housing, and construction at Outlot A.
Staff responded to each inquiry directly.
Joint Development Authority
TCAAP Redevelopment Project
Joint Development Authority
TCAAP Redevelopment Project
AGENDA ITEM 3d
MEMORANDUM
DATE: October 6, 2025
TO: Joint Development Authority Board of Commissioners
FROM: Directors Mitchell and Jagoe
SUBJECT: Review Road Map
See attached for updated Road Map.
Attachment:
2025-2026 JDA Road Map
Month Date Meeting/Action or Deadline Topics or Notes
JDA Commissioner Onboarding City/County onboarding of respective new commissioners
21 JDA Meeting Organizational Items, Sustainability Design Guidelines, Outlot
A Concept Review
3 JDA Work Session 2024 JDA Annual Report, Legislative and Communications
Update
15
17 JDA Meeting Outlot A Entitlements Review, Committee Assignments
27 JDA Advisory Committee Meeting Discuss Development Agreement
7 JDA Meeting Outlot A Development Agreement, Budget Review
9 JDA Advisory Committee Meeting Discuss Development Plans
16 Energy Advisory Committee Meeting Onboarding
1
5 JDA Meeting Budget Amendment
7 JDA Advisory Committee Meeting Discuss Development Agreement
14 JDA Advisory Committee Meeting Discuss Development Agreement
16 Energy Advisory Committee Meeting District Energy
30 JDA Advisory Committee Meeting Discuss Development Agreement
2 JDA Meeting
4 JDA Advisory Committee Meeting Discuss Development Agreement
11 JDA Advisory Committee Meeting Discuss Development Agreement
18 JDA Advisory Committee Meeting Discuss Development Agreement
23 JDA Advisory Committee Meeting Discuss Development Agreement
25 Special JDA Meeting Consider extension to Preliminary Development Agreement
30
Jun
Expiration: Preliminary Development Agreement with Alatus
Jan
Rice Creek Commons 2025 Roadmap
Feb
Deadline: JDA Annual Report due to City and County
Deadline: Draft 2026 JDA Budget
Mar
Apr
May
2 Special Closed JDA Meeting Litigation
7 JDA Work Session Solicitation Process
21 Special Closed JDA Meeting Litigation
23 Energy Advisory Committee Meeting Updates
Aug 4 JDA Work Session Solicitation Discussion, Energy Advisory Committee Updates
1 Deadline: Coordinate JDA Budget with City and County budget processes
9 JDA Meeting Request for Information Review
26
6 JDA Work Session Infrastructure Update, Sustainability Webinar Review
24
3 JDA Meeting Adopt 2026 JDA budget, RFI presentation [tentative]
Sustainability Info Session
15 Deadline: Report back on City/County approval of JDA budget
Dec 1 JDA Work Session
Sept
Jul
Oct
Nov
Request for Information released
Request for Information closes
Month Date Meeting/Action or Deadline Topics or Notes
Jan 5 JDA Meeting Organizational Items
2 JDA Work Session 2025 JDA Annual Report
15
Mar 2 JDA Meeting
Apr 6 JDA Work Session
1
4 JDA Meeting
Jun 1 JDA Work Session
Jul 6 JDA Meeting
Aug 3 JDA Work Session
1 Deadline: Coordinate JDA Budget with City and County budget processes
TBD JDA Meeting
Oct 5 JDA Work Session
2 JDA Meeting
15 Deadline: Report back on City/County approval of JDA budget
Dec 7 JDA Work Session
Sept
Nov
Deadline: Draft 2027 JDA Budget
May
Rice Creek Commons 2026 Roadmap
Feb
Deadline: JDA Annual Report due to City and County
Joint Development Authority
TCAAP Redevelopment Project
Joint Development Authority
TCAAP Redevelopment Project
AGENDA ITEM 4
MEMORANDUM
DATE: October 6, 2025
TO: Joint Development Authority Board of Commissioners
FROM: Director Mitchell
SUBJECT: Administrative Director’s Report
A verbal update will be provided by staff.
Joint Development Authority
TCAAP Redevelopment Project
Joint Development Authority
TCAAP Redevelopment Project
AGENDA ITEM 5
MEMORANDUM
DATE: October 6, 2025
TO: Joint Development Authority Board of Commissioners
FROM: Director Jagoe
SUBJECT: Development Director’s Report
A verbal update will be provided by Director Jagoe.