Minutes of Council Workshop Meeting
Village of Arden Hills
Wednesday, June 20, 1984 - 7:00 p.m.
Village Hall
Call to Order
Pursuant to due call and notice thereof, Mayor Woodburn called
the meeting to order at 7:08 p.m.
Roll Call
Present
- Mayor Robert Woodburn, Councilmembers Dale Hicks,
Michael Christiansen, Kathleen Rauenhorst, Thomas
Mulcahy
- None
- Engineers Norm Hendrickson, Donald Christoffersen,
Treasurer Donald Lamb, Public Works Supervisor
Bud Johansen, Public Works Committee members,
Clerk Administrator Charlotte McNiesh, Deputy
Clerk Dorothy Zehm
.
Absent
Also Present
Water Tower Needs Assessment - Engineer Norm Hendrickson
Council was referred to a data package, copies of which were
distributed to Council. Hendrickson explained that the population
figures used were based on the Comprehensive Plan population study
made by the City Planner; based on this study, the 1983 estimated
population connected to the Arden Hills water system is 6,350;
noted that the estimated population connected in 1994 is projected
at. 10,200 after deducting population of direct connections to
Roseville (295) and the mobile home park (873).
Hendrickson referred Council to actual Arden Hills water pressure
chart indicating water levels and water consumption at Arden Hills'
tower on August 6, 1983. Hendrickson noted that between 6:30 a.m.
and 11:00 p,m., when pumps are pumping, pressure drops to 40 psi
(considered a low pressure for industrial areas). Hendrickson
explained that he chose August 6th because it is a Saturday, when
there is not much industrial use, but a good water use day.
Hendrickson reported that the Roseville booster station (Arden
Hills' water source) is capable of pumping in excess of the
Roseville/Arden Hills fire demands as recommended by Insurance
Services, which are: -
4000 gpm for
5000 gpm for
3000 gpm for
4 hours to
5 hours
3 hours
Industrial
is considered a reasonable fire
demand for a city of the nature
of Arden Hills, according to
Hendrickson.
Hendrickson noted that insurance rates are based on the City's
rating class. Arden Hills currently is class 6. It was noted
that the lower the class the lower the rate; probably a class
6 because of volunteer fire department status. Hendrickson
noted that cities are not required to provide for fire demands;
noted these are the figures recommended by fire underwriters.
.
Hendrickson noted that consumption by Arden Hills & Roseville
combined was 11,066,652 gallons, on 8/6/83; 15.2% of this
consumption is the estimated consumption of Arden Hills based on
the 6350 population figure (1,682, M gallons); noted that it is
common practice to store an average day's water usage.
Peak hour, maximum day and average day Arden Hills water consumption
were noted by Hendrickson as well as the estimated consumption
anticipated for a maximum day plus fire demand, and for a maximum
day plus fire demand with arsenal connection. Hendrickson
referred Council to chart showing peak hour daily consumption
compared with peak hour consumption with arsenal connection.
Minutes of Council Workshop Meeting
Wednesday, June 20,1984 - 7:00 p.m.
Page Two
Combined Roseville and Arden Hills Water Use Records of August
6, 1983 were reviewed by Hendrickson, noting the approximate
percent of one day's water needs the City would have with a
1.5 MG tank and with a 1.0 MG tank, together with the existing
storage tan~ should a complete power failure occur at the
Roseville booster station under the given circumstances outlined.
1.5MG tank - 65%
1.0MG tank - 47%
Hendrickson explained that a 1.0 million gallon tank is needed
now, to provide for the recommended fire demand; if arsenal is
connected, a 1.5 MG tank would be needed. 4It
Hendrickson explained that the Roseville pumps have the pumping
capacity; the pumps are not the problem; sufficient storage of
water for the community's daily needs, peak hour needs and fire
demand, and possibly the connection of the arsenal to the system
are the reasons an additional storage tank is needed; noted that
Roseville can satisfy Arden Hills' and the arsenal's needs;
Roseville pumps from St. Paul's 20,000,000 gallon storage at
McCarrons. It was noted by Hendrickson that power failures are
probable and have happened; tornadoes are possible (could be out
.of power for several days, possibly). Hendrickson explained that
pressure will not be increased in Arden Hills because of an
additional storage tank; noted that pressure varies in different
areas of the City now - a new tower will not affect this pressure.
c:V
Hendrickson noted that ' 12" main was installed south of
County Road D in Roseville, in a two block area. ' . ,
. L. There is a question whether this 12" main may have to be
replaced.
The time frame for Council consid'eration was suggested to be
whenever Council desires. It was suggested that perhaps Council
would like to have response from the arsenal first and recommend-
ations from the Public Works and Finance Committees. Hendrickson
estimated the tower construction would take 1~'-2 years; depending
on season construction started.
Mulcahy said he felt more information is needed; doesn't feel
data on one day's records is sufficient to make a determination.
Preliminary Schematics of Future Hamline Avenue Improvements -
Engineer Donald Christoffersen
Christoffersen referred Council to drawing of two options which
he proposes to present to the Highway Department for improvement
of the Hamline/I-694 intersection. Christoffersen said his
preference is the option which stops the ramp traffic at Hamline,
with a right angle turn from the ramp onto Hamline (instead of
the existing ramp which merges ramp traffic with the Hamline
traffic~ Christoffersen explained that the other option he
proposes to present for the Stat~'s consideration is re-routing the
ramp from I-694 to County Road F, east of Hamline (thru the tower
property) . 4It
The proposed intersection improvement, Christoffersen explained
will also provide for an acceleration lane from Floral Drive to
the south, a left turn lane from the south to Floral Drive,
a right turn lane into CPI and one thru-lane.
Christoffersen said the other two options for the intersection
appear to be - do nothing, or take out the ramp entirely.
Council was also referred to cross-sections of various road width
options, on which Christoffersen will need guidance from Council
as to the street width desired for Hamline Avenue from about Eide
Circle to Highway 96.
.
.
~
Minutes of Council Workshop Meeting
Wednesday, June 20, 1984 - 7:00 p.m.
Page Three
Christoffersen noted that there are deep swamp areas along
Hamline which he proposes to surcharge; suggested that the time
to do this would be at the time of the Hamline/I-694 intersection
improvement.
Council authorized Christoffersen to present the option proposals
to the State, with the understanding that Council will again
consider the options for the intersection improvement before the
State decision is made.
(Rauenhorst left the meeting at 9:25 p.m.)
Karth Lake Level
Christoffersen reported that the level of Karth Lake has risen
and residents are concerned about loss of trees; explained that
there is no outlet from the lake.
Christoffersen reported that Bob Todd has been taking lake level
measurements.
Keith Enrooth reported that he has already lost 4 Oak trees;
other residents will also be losing trees because of the high
water; suggested that pumping out about 1~'-2' of the water
would help the lake residents; noted that lake is up about 2'
since the ice went out - level has risen about 18" over the last
two weeks.
Bob Todd referred Council to water level data recorded between
September 22, 1983 to June 13, 1984; noted that he canoed around
the lake and observed that about 50 oak trees have died and
many are right on the water's edge; suggested that if City is
considering a pumping solution, it should be done now.
Todd said the original plat of Karth Lake Estates shows the lake
at 929.8 (1977); lake is now at 936.0, an increase in elevation
of 6.2 feet.
The lake area was estimated at 15 - 18 acres. It was queried
whether it is reasonable to pump it, and, if so, would it be a
temporary or permanent pump.
Council requested that costs of pumping be obtained for Council's
consideration at the June 25th meeting.
Water Tower Antenna Proposal
Woodburn reported on the possible request to use the water tower
for mounting "whip antennas" instead of constructing a 150+ foot
high tower to serve a mobile telephone service. A structure of
about 22'x26' to house equipment is also needed. Ccuncil concurreo
to make this an agenda item for the June 25th Council meeting.
Adjournment
The meeting adjourned at 10:00 p.m.
(lJdU'Ucb t/)Fk~ ,
Charlotte McNiesh
Clerk Administrator
~~dh7~~
ober L. Woodburn
Mayor