HomeMy WebLinkAbout09-09-25 JDA amendedJoint Development Authority
Monday, September 9, 2025
Arden Hills City Council Chambers
Minutes
5:30 pm
Roll Call
Joint Development Authority: Chair Jon Wicklund, Commissioner Tara Jebens-Singh,
Commissioner Kurt Weber, Commissioner Mary Jo McGuire, Commissioner Tena Monson
Also present: Jessica Jagoe (Arden Hills); Ella Mitchell (Ramsey County), Jenny Boulton (Kutak
Rock)
Roll call taken.
Approval of Agenda
Motion by Commissioner Monson seconded by Commissioner Jebens-Singh to approve the
agenda as presented. Motion carried.
Approval of Minutes
Motion by Commissioner Jebens-Singh seconded by Commissioner Weber to approve the July
2, 2025 Closed JDA meeting minutes, July 7, JDA meeting minutes, July 21 Closed JDA meeting
minutes and August 4, JDA work session minutes. as presented. Motion carried.
Public Input
Steve Scott, 4286 Norma Avenue, addressed the JDA regarding the County’s mismanagement of
this project, especially over the past eight years. He indicated the early phases of TCAAP had
Ryan Companies working on a plan only to withdraw after a number of years noting tackling the
largest superfund site in the State was too risky for their investors. He explained an NFL
stadium was once proposed by several County Commissioners. Concerns soon rose about
where the residents of Arden Manor would live and one Commissioner stated they would have
to find somewhere else to live, which sparked an outcry from Arden Hills residents. He stated
affordable housing did not appear to be a priority for the County at that time. After the NFL
choose downtown the County purchased the TCAAP site from the federal government. He
reported a joint powers agreement was drafted and the JDA was formed. He indicated the JDA
was responsible for the cleanup and sale of the property, while the City was tasked with zoning
the parcel, producing a master development agreement and an AUAR. He noted all of these
deliverables were accomplished and delivered on time. He stated late in 2016 the County
members of the JDA presented an extensively redlined project vision vastly increasing the
proposed housing density, levels of affordability and demanding the City front a much larger
financial contribution. The County insisted the City sign off on this within four days, which
occurred over a holiday weekend. The City indicated they would have to take this matter back
to the taxpayers but offered the opportunity to negotiate the differences/sticking points. He
explained the County agreed to special worksession in early 2017 to hammer out the sticking
points but never showed up for the meeting. In fact, the County boycotted all subsequent JDA
meetings for the next four years and ultimately sued the City for being an unwilling partner
despite the City continuing to show up at all scheduled meetings. He reported the County
withdrew its funding and participation in the JDA and focused on other redevelopment projects
in the County, one being the Rivers Edge Project in St. Paul. He noted the Rivers Edge Project
was completed with zero affordable housing units in downtown St. Paul. Meanwhile, the
County sued the City of Arden Hills for being an unwilling partner and sought to have the
County nullify the joint powers agreement citing a hopeless impasse. He reported during court
ordered mediations, the City offered a higher level of density, which was rejected by the
County. After the court rejected the County’s claim that the City was the unwilling partner, the
court suggested the City and developer start direct negotiations and this was done. He stated a
new term sheet was produced where the developer greatly reduced the financial risk for Arden
Hills taxpayers. He indicated the County then rejected that agreement insisting that the City
accept higher housing density and affordable levels or else.
Chair Wicklund asked that Mr. Scott jump to his conclusion.
Mr. Scott noted from 2016 to 2022 was considered a golden time to start construction because
interest rates were low, construction costs were low and the job market was strong. However,
the County squandered this opportunity for reasons that have not been explained. He asked at
what point do the taxpayers get an honest and transparent of the projects viability and costs.
He noted a current member of the JDA recently vowed to move the project forward but he
stated at the edge of a cliff moving forward may not be the most prudent action. He explained
Ryan Companies saw this many years ago and now the Arden Hills taxpayers are wondering
how much of their funding will be poured into this risky project.
Megan Howard, 1323 Watson Avenue in St. Paul, supported this development moving forward
because the Twin Cities desperately need more housing. She encouraged the JDA not let
perfect become the enemy of good. She recommended the proposed plan move forward in
order to provide more housing.
Paige Kale, resident of St. Paul, explained she was with Yes in my Backyard. She questioned if
now was the time to talk about the development.
Chair Wicklund stated now would be the time to speak.
Ms. Kale thanked Director Mitchell for reaching out to her today regarding this project. She
indicated she has been in communications with Bob Lux with Alatus as well as Maplewood
Development. She commented she has heard their side of the story and understood the JDA
decided to allow the agreement with Alatus to expire back in June. She explained after
watching the June JDA meeting, it appears there was frustration with Alatus and their lack of
response. She expressed frustration with the fact the JDA let this frustration get in the way of a
10 year partnership with Alatus. She stated Alatus had millions of dollars invested in this
project. She was of the opinion there were two members on the JDA that may have voted to
extend the agreement, but the majority was unhappy with Alatus. She encouraged the JDA not
to throw the baby out with the bath water. She reported this development was becoming a
national case study for what was wrong with getting housing on the ground. She indicated she
lived in St. Paul and she saw homeless people every day. She explained she had a lot of
emotions when it came to the JDA’s inability to get this much needed project off the ground
with the housing that was so desperately needed for the region. She stated Alatus has pledged
tens of millions of dollars of private financing to make this project happen and the JDA does not
want to see this project move forward. She indicated she was an environmentalist and she
understood sustainability guidelines were important, but she also knew it was important for
people to have housing. She questioned what the cost of the sustainability guidelines would be.
She reported one of the members of the JDA was the vice president of a solar panel company
and this was not a good look for the JDA. She stated Alatus would gladly come back to the table
and negotiate with the JDA, but in the meantime has filed a lawsuit against the JDA. She
understood the judge has stated Alatus has a case and that Ramsey County, the JDA and
taxpayers will have to pay millions of dollars to Alatus. She encouraged the JDA to renegotiate
with Alatus. She suggested the JDA members do what was right as public servants.
Lyle Salmela, 1480 Arden Vista Court, stated for his 30 years of involvement with the RAB, ERAB
and the JDA, he believed Rice Creek Commons was a tremendous opportunity for the growth of
Arden Hills and the metro area. He supported building the roads next year as this will set the
development on a path of major development occurring in 2030. He wished the JDA all the best
with its visions and goals.
Alex Punski, 16025 37th Avenue N in Plymouth, noted he was an employee of Alatus. He
understood there was a lawsuit between Alatus and the JDA team. He commented he was the
head of construction for Alatus and he does all of the fun finish details. He reported Alatus
wants to complete this development and would be willing to drop the lawsuit. He asked that he
be allowed to meet with the JDA team as soon as possible in order to get this project moving
forward. He stated Alatus had a great team assembled to complete this project.
Noah Schneider, 808 Airy Street in St. Paul, stated in listening to recent JDA meetings, he
understood there was a vision to have an all-electric development on Rice Creek Commons. He
explained he agreed with this, but noted he has not heard how much this will cost and add to
each home price. He reported there was a need for more housing, especially affordable
housing. He asked if these costs were being considered. He feared that the sustainability goals
would greatly impact the affordable units within this development. It was his hope the JDA
could prioritize the additional housing and not let perfect be the enemy of good.
Consent Agenda
None.
Old Business
None.
Public Hearings
a. Planning Case 25-003 and Resolution 2025-002 – Preliminary Plat and Final Plat –
Outlot C, TCAAP – Ramsey County
Director Jagoe stated Ramsey County (“Applicant”) has requested approval of a Preliminary Plat
and Final Plat to subdivide Outlot C (“Subject Property”), often referred to as the “California
Parcel”, of the TCAAP Plat for Rice Creek Commons. The Rice Creek Commons site is in the
northwest corner of the City located to the east of U.S. Highway 10 and I-35W, north of
Highway 96, west of the Arden Hills Army Training Site, and south of County Road I.
Director Jagoe reported the purpose of this platting process is for dedication of the public road
right-of-way for the Spine Road. Two large Outlots would be created as part of the plat for the
future Rice Creek Commons development. These Outlots would be further subdivided and
replatted at the time of the future development. The current platting process is not associated
with any specific development on the site. A copy of the proposed Preliminary and Final Plat
named “Rice Creek Commons Second Addition” was reviewed with the JDA. The following is a
description of the proposed Outlots and right-of-way dedication on the plat:
x Outlot A = 93.25 acres (4,062,028 s.f.)
o This parcel will be further subdivided and developed in the future as part of the Rice
Creek Commons development.
x Outlot B = 252.88 acres (11,015,634 s.f.)
o This parcel will be further subdivided and developed in the future as part of the Rice
Creek Commons development
x Rice Creek Boulevard Right-of-Way = 25.92 acres (1,128,912 s.f.)
Overall Subject Property Platted Area = 372.04 acres
Director Jagoe stated future further subdivisions of the newly created Outlot A and Outlot B
within the Rice Creek Commons development area would be brought forward for review by the
Joint Development Authority (JDA) in accordance with the TCAAP Redevelopment Code (TRC).
Director Jagoe commented further on the Plan Evaluation and offered the following Findings of
Fact:
x The former Twin Cities Army Ammunitions Plant (TCAAP) site is in the northwest corner
of the city located to the east of U.S. Highway 10 and I-35W, north of Highway 96, west
of the Arden Hills Army Training Site, and south of County Road I.
x Ramsey County has requested a Preliminary Plat and Final Plat of the TCAAP, Outlot C
site in order to subdivide the parcel for delineation and dedication of the public right-of
way for the Spine Road.
x The current platting process is not associated with any specific development on the site.
x The future subdivision and replatting of Outlots A & B - Rice Creek Commons Second
Addition for the Rice Creek Commons development would be evaluated at that time
based on all applicable provisions and regulations in the City Code and the TCAAP
Redevelopment Code.
x The proposed Preliminary Plat and Final Plat are consistent with the Arden Hills Zoning
Map, TCAAP Regulating Plan, and the 2040 Comprehensive Plan.
Director Jagoe reviewed the options available to the JDA, noting staff recommended approval
of JDA Planning Case 25-003 and adopt Resolution 2025-002 for a Preliminary Plat and Final Plat
of Outlot C a 372.04 acre parcel within Rice Creek Commons, based on the findings of fact and
the submitted plans, as amended by the conditions in the September 9, 2025 Report to the
Joint Development Authority Board:
1. The Applicant shall record the Final Plat with Ramsey County within sixty (60) days of
the JDA’s approval and a copy of the recorded plat shall be provided to the City.
2. All items identified in the September 2, 2025, City PW/Engineering Division memo shall
be addressed prior to the recording of the Final Plat. All comments shall be adopted
herein by reference.
Chair Wicklund opened the public hearing at 5:59 p.m.
Ian Adams, 1328 Watson Avenue in St. Paul, thanked the JDA for their service and for allowing
him to speak. He questioned why it was advantageous for the JDA to pursue another developer,
given that the Alatus contract had expired. He suggested the JDA consider hiring a real estate or
legal professional that has experience in doing projects close to $1 billion to negotiate with
Alatus to see if a deal could be struck. He encouraged the JDA to reduce friction instead of
increasing power as this project moves forward. He stated the United States was behind when
it came to building costs compared to Europe.
Chair Wicklund closed the public hearing at 6:02 p.m.
Commissioner McGuire thanked staff for all of their efforts on this matter. She asked if this
action was for platting to allow the public road right of way to be installed, which was a basic
step to move this project forward. Director Jagoe reported this was the case. She noted this
process would dedicate the public right of way for the spine road and would allow the County
to continue with their design plans and construction in 2026.
Commissioner McGuire stated she appreciated how this action would move the project
forward.
Commissioner Weber expressed concern with the fact the proposed right of way would be 130
to 140 feet wide. He was of the opinion this width was exceptionally wide. Director Jagoe
reported the 130 to 140 foot width was correct noting this aligns with the TRC and would allow
for the trails, public sidewalks and roadway.
Commissioner Weber indicated he would have liked to review the 60% design plans. He was of
the opinion 100 feet would have been adequate for the trail, sidewalk and roadway right of
way. He did not believe the County should be taking more than they needed, even if this was
only 10 to 20 feet on each side of the roadway. He feared this was wasted space. Director Jagoe
commented the standard the County was proposing for the right of way corridor meets the TRC
standards. She indicated the tree plantings, utility installation, street lighting, sidewalks, right of
way, and roadway does cover the proposed expanse. She anticipated the County could come
back to the JDA with design plans for the roadway corridor.
Commissioner Weber stated he would like to see the plans to ensure the JDA was not over
dedicating.
Chair Wicklund commented he would like to see the plans.
Commissioner Monson explained the corridor has to be this wide because the TRC requires it.
Director Jagoe indicated this was the case.
Commissioner Monson reported if the corridor was to be narrowed, adjustments would have to
be made to the TRC. Director Jagoe explained standards would have to be reviewed to see
where adjustments could be made.
Commissioner Monson stated a traffic study was completed for this project. Director Jagoe
indicated a traffic study was completed through the AUAR process.
Commissioner Monson inquired if the proposed roadway width was necessary for the traffic
that would be flowing through this area. Director Jagoe explained she did not have the
engineering background to answer this question. However, she understood the layers of
amenities included along this corridor would require 130 to 140 feet of right of way.
John Masatello, Deputy Director of Public Works for Ramsey County, introduced himself to the
JDA. He explained he designed all of the construction projects for Ramsey County. He reported
he was the project manager for the spine road. He stated the right of way was established
based on the need of the infrastructure that needs to be built with the spine road that includes
the roadway width, curb and gutter, storm drainage, boulevard, sidewalk, trails and lighting. In
addition, to having space for a district energy or geothermal component.
Commissioner Monson questioned if this roadway would be wide enough to handle the level of
traffic that would be flowing through this area. Mr. Masatello indicated he was comfortable
with the proposed roadway width for the traffic that would be generated by the site.
Commissioner Monson stated she appreciated having this information and thanked Mr.
Masatello for addressing the JDA.
Motion by Commissioner Weber seconded by Commissioner McGuire to approve Planning Case
JDA Planning Case 25-003 and adopt Resolution 2025-002 for a Preliminary Plat and Final Plat of
Outlot C a 372.04 acre parcel within Rice Creek Commons, based on the findings of fact and the
submitted plans, as amended by the conditions in the September 9, 2025 Report to the Joint
Development Authority Board.
Commissioner Monson explained being able to put the spine road in is key to any future
development. She understood the history of this project and indicated the JDA was doing its
best to get this project across the finish line. She reported the plan was to move forward with
the construction of the spine road in 2026. She discussed how the JDA had new faces and these
individuals would continue to work to move this project forward.
Commissioner McGuires stated Ramsey County was in the budgeting process right now and
supported this item coming forward. She indicated the County Board was aligned as a Board in
getting this project done.
Motion carried.
New Business
a. Approve Revised Sustainability Design Guidelines
Director Mitchell stated at the August JDA work session, the JDA reviewed updates from the
Energy Advisory Committee and consultants, including proposed revisions to the Sustainability
Design Guidelines. These revisions clarify language and requirements around electric vehicle
chargers.
Commissioner McGuire commented she believed these guidelines were a great step forward
and reflect the values of both the County and JDA.
Commissioner Weber assured the public that the energy committee had considered the cost of
the proposed sustainability guidelines. He indicated this was a big concern and noted Ryan
Companies reviewed and provided the JDA with feedback on the sustainability process, noting
no major hurdles were reported.
Commissioner Jebens-Singh explained these guidelines were revisited in order to build a
process that walks along side any future developers and meets with them with the technical
guidance that was necessary, while also having ways to request waivers.
Commissioner Monson indicated when it came to the sustainability guidelines, the JDA was
pragmatic while also trying to do big things. She was disappointed that there was a narrative
that sustainability was in contrast to affordability. She reported experts have been brought in to
assist the JDA with this project. She commented on how much residents in Arden Hills were
paying for energy bills each year. She discussed how important it was for homes to have tight
envelopes in order to reduce energy costs.
Motion by Commissioner McGuire seconded by Commissioner Jebens-Singh to approve the
revised Sustainability Design Guidelines. Motion carried.
b. Review Draft Request for Interest
Director Mitchell stated a Request for Information (RFI) has been drafted for JDA review and
approval. As stated in the RFI document, its purpose is to gain information to inform a future
solicitation for development at Rice Creek Commons. The Anticipated Timeline section is not
yet filled in as the timing may vary depending on the need for revisions or additional
promotion. Staff will distribute the RFI through channels including but not limited to
DemandStar, the Rice Creek Commons newsletter, and RiceCreekCommons.com.
Commissioner McGuire commented she was curious to see what new interests there may be in
this site and what new ideas people may have. She supported the JDA moving forward with an
RFI. She questioned how long the RFI process would take. Director Mitchell proposed keeping
the RFI process open for four weeks, noting there would always be an option to extend.
Commissioner Weber stated he was pleased to see the RFI got put together so quickly. He
noted he had no proposed changes.
Commissioner Jebens-Singh indicated the RFI was drafted after considering the sustainability
goals and missions for this project. She explained the JDA was interested in learning if there
were developers that would engage with this project. She appreciated the fact that all founding
documents have been put in one place as this would provide all future developers with the
goals and requirements for this development, which included having at least 20% of the total
housing units will be affordable at 60% AMI or below and 10% of the total for sale housing will
be eligible for Ramsey County down payment assistance. She thanked staff for the quick
turnaround on the RFI. She indicated the JDA was being mindful and responsible as this project
moves forward.
Commissioner Monson inquired if staff should draft a question for Page 9 that addresses the
challenges surrounding district energy within the RFI.
Chair Wicklund supported staff adding this question to the RFI.
Commissioner Weber indicated district energy was important to him and he wanted to see this
move forward.
Commissioner Monson explained she wanted to see district energy called out to ensure
developers understand this was a requirement and that feedback would be helpful. Director
Mitchell noted district energy was mentioned on Page 6 and was addressed within the
sustainability guidelines. She suggested a sentence be written into the RFI that encourages
developers to read the supporting documents, which would include the Sustainability
Guidelines.
Commissioner Monson suggested further language be written into the RFI that addresses how
the developers will create foot traffic. Director Mitchell stated she could draft language to
address this matter.
Commissioner McGuire supported this recommendation noting she wanted to see this
development becoming a walkable community.
Commissioner Jebens-Singh recommended the language speak to all levels of accessibility and
not just walking.
Commissioner Monson inquired if the JDA would be able to speak to the developers who
respond to the RFI in person. She commented she was interested in speaking with a developer
that has a unique vision for this property. She suggested this be a recommendation but not a
requirement. She recommended the City use its channels to advertise the RFI.
Chair Wicklund questioned how fast the RFI would be put out the door. Director Mitchell
indicated she was confident the RFI could be put out prior to the next JDA meeting.
Chair Wicklund stated if this was the case, he would like the JDA to receive an update on the RFI
process at the October JDA meeting. He discussed how this project moved from 10% to 20%
affordable units as well as moving from 1,460 to 1,900 housing units. He understood the pace
of the development may not feel great for everyone, but stated the JDA would continue to
move this project forward.
Motion by Commissioner Jebens-Singh seconded by Commissioner Weber to approve Request
for Information as amended. Motion carried.
c. Discuss Community Engagement Proposal
Director Mitchell stated there was a discussion at the August JDA meeting about organizing
digital informational sessions instead of an in-person community event this fall. Some of the
advantages of an online format include more accessibility to residents, less time commitment
for both residents and staff, and the ability to post the recording online for viewing at any time.
After discussing with consultants, staff propose organizing a webinar focused on sustainability
and clean energy that will include a presentation on the advances made over the past two years
and time for questions and answers. This webinar could also include a review of how residents
can learn more about the project and a request for topic suggestions for future info sessions.
The webinar would be advertised on the project website and through the newsletter, and the
recording would also be posted on the website. If the webinar is successful, then the JDA may
consider repeating this format on other topics.
Director Mitchell explained staff has noted comments on the materials available on the project
website and are working to strategize, within technical constraints, on how to ensure as much
information is readily accessible as possible. Residents are encouraged to use the comment box
on RiceCreekCommons.com or reach out to JDA members or staff to request information or
documents.
Chair Wicklund stated doing an electronic webinar would save time and could assist with
focusing the topic for the event. He questioned what success would look like for this type of
event.
Commissioner McGuire explained she loved the idea of an informational webinar. She
suggested the JDA consider hosting at least two webinar events.
Commissioner Weber commented he was interested in documents being readily available on
the Rice Creek Commons website. He hoped that people would attend the webinar events and
come forward with questions. He believed success would be people asking questions and
providing new topics.
Commissioner Jebens-Singh stated a webinar like this would allow for multiple audiences to
engage with this topic in a transparent manner over time. She asked how these events would
overlap with the RFI. Director Mitchell indicated she would be open to feedback from the JDA
on this, noting the event could be geared towards the public, or RFI responders were also
welcome to join.
Commissioner Monson explained she liked the idea of surveying people about future topics.
She anticipated these events would be successful. She recommended the webinar event be
well marketed and suggested the event be open to the public.
Chair Wicklund asked how urgent it was to get this project completed. He questioned if staff
could begin working out details and the JDA could finalize the plans for the webinar in October.
Commissioner McGuire wanted to see the website updated as quickly as possible and noted
she could wait for the webinar to be finalized in October.
Commissioner Weber stated the RFI was the priority and he did not believe the webinar had to
inform the RFI.
Commissioner Jebens-Singh commented she liked the idea of making sure staff can stagger this
work in order to get the RFI out first and that the webinar would be finalized in October.
Commissioner Monson stated she would like to see the community engagement done before
the end of the year because people want to know what’s going on.
Director Mitchell inquired if the JDA wanted to see the material from the consultants before it
is released.
Chair Wicklund recommended the content be reviewed on October 6 before being released to
the public. He suggested the webinar be 30 to 35 minutes, noting success to him would be
having at least 50 people in attendance. He encouraged the JDA members to consider what
topic should be covered in the second webinar.
d. Review Road Map
Director Mitchell reviewed the Road Map with the JDA.
Administrative Director’s Report
Director Mitchell stated she had nothing further for the JDA.
Development Director’s Report
Director Jagoe stated she had nothing further for the JDA.
Commissioner Updates
Commissioner McGuire thanked staff for all of their efforts to keep this project moving forward.
Commissioner Weber indicated he ran for city council in order to move the Rice Creek
Commons projects forward and to get affordable housing in Arden Hills. He stated this project
remains a high priority for him and he thanked the public for voicing their concerns.
Commissioner Jebens-Singh thanked the public for voicing their concerns surrounding
affordable housing. She indicated she has felt the same frustrations but noted the County and
City were in alignment when it came to affordable housing and a commitment to moving this
project forward.
Adjournment
Meeting adjourned at 7:19 pm.
Approved _____________________________________ _______________________
Jon Wicklund, Chair Date
November 3, 2025