HomeMy WebLinkAbout11-10-25-WSAddress:
Mayor: 1245 W Highway 96
David Grant It Arden Hills MN 55112
-AEN HILLS Phone:
Councilmembers: 651-792-7800
Brenda Holden City Council Work Session
Emily Rousseau Website:
Tena Monson Agenda www.cityofardenhills.org
Kurt Weber November 10, 2025
5:30 p.m.
City Hall
City Vision
Arden Hills is a strong community that values its unique environmental setting, strong residential
neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our
long-standing tradition as a desirable City in which to live, work, and play.
Members of the public may attend a
meeting in -person at City Hall or they
may view the meeting remotely on the
City's website using the below link.
Meetings are also broadcast on Cable
Channel 16 for those that live in Arden
Hills.
https://cityofardenhills.orci/320/Watch-
City-Meetings
This meeting will be streamed live on local Cable Channel 16 and available for playback on our
website.
CALL TO ORDER
1. PUBLIC INQUIRIES/INFORMATIONAL
This is an opportunity for citizens to respectfully bring to the Council's attention any
items which are relevant to the City. In addressing the Council, you must first state
your name and address for the record. Comments shall be limited to three (3) minutes
or less. Written documents or other materials should be handed to the City Clerk for
distribution to the Council prior to or during the meeting. Council will generally not
respond at the same meeting where an issue is initially raised by a member of the
public but the Council may refer the issue to staff for further research and possible
report or action at a future Council meeting.
2. RESPONSE TO PUBLIC INQUIRIES
3. AGENDA ITEMS
3.A. 2026 Budget Discussion
Joua Yang, Finance Director
Documents:
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
3.B. 75th Anniversary Planning Budget
Julie Hanson, Assistant to the City Administrator/City Clerk
Documents:
MEMO.PDF
ATTACHMENT A.PDF
3.C. 2026 Fee Schedule Discussion
Julie Hanson, Assistant to the City Administrator/City Clerk
Documents:
MEMO.PDF
ATTACHMENT A.PDF
3.D. Work Session Topics
Jessica Jagoe, City Administrator
Documents:
MEMO.PDF
ATTACHMENT A.PDF
3.E. Rice Creek Commons/TCAAP Discussion
Jessica Jagoe, City Administrator
Documents:
MEMO.PDF
3.F. Agenda Planning
Jessica Jagoe, City Administrator
Documents:
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
4. COUNCIL/STAFF COMMENTS
ADJOURN
lt
�R� HILLS
MEMORANDUM
DATE: November 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Joua Yang, Finance Director
SUBJECT: 2026 Proposed Budget and CIP
Budgeted Amount: Actual Amount:
N/A N/A
Council Should Consider
AGENDA ITEM - 3A
Funding Source:
N/A
Staff is requesting that City Council review and provide feedback to the attached proposed 2026 Budget
and CIP. The Truth -in -Taxation meeting is scheduled for December 8, 2025, where a final budget and
tax levy will be adopted.
Background
Budget discussions were held with the Council in July, August, and September. Council adopted a
maximum tax levy increase of 18.32% on September 29, 2025. The final levy and budget adoption
meeting is scheduled for December 8, 2025.
Discussion
Changes since September 29, 2025 Meeting
• Personnel changes that include the below:
o Current wage and corresponding step increases for recent hires — increase of $14,617
o Updated non -union health and dental premiums — no impact to the levy
Note: The 2026 preliminary budget included a 15.0% placeholder for health and a 4.0%
placeholder for dental premium increases, which is sufficient to cover the updated
premiums
Police contract amount was adjusted to reflect the latest estimates from the Ramsey County
Sheriff's Office— decrease of $101,056
A summary of the major changes in the 2026 proposed budget is as follows:
Page 1 of 7
Transfer to Cable Fund
% of
Effect on Levy % Chg Cost Categories Balanced Levy
50,000 0.83% 50,000 4.91%
Step Increases
54,161
3% COLA Adjustments
45,448
99,609
9.8%
Public Works Staffing Phase 2- 1 Lead (Jan 2026 Start)
3,322
3,322
0.3%
Reconthe Go
8,100
8,100
0.8%
Health Insurance/Work Comp Benefits
48,266
48,266
4.7%
Personnel Costs
159,297
2.64%
159,297
15.65%
Increase in RamCo Sheriff
233,475
Increase in UFD
159,231
Increase in Ramco Dispatch
12,780
405,486
39.89,16
RamCo Facility Maintenance Facility- Rent
5,847
5,847
0.6%
Permit Software Conversion
60,000
60,000
5.9%
Park Maintenance (Park Sign Replacements, Buckthorn Removal, Supplies/Materials-
47,420
47,420
4.7%
Springbrook Metro -I NET Server Migration
10,000
10,000
1.0%
Street Maintenance Program/PWMP Street Projects
(30,500)
(30,500)
-3.09/o
PY Underfunded Levy Costs
122,009
122,009
12.0%
Net changes in other GF Budget Areas & PY Underfunded Levy Costs
21,258
21,258
2.1%
Total General Fund Costs
850,817
14.11%
850,817
83.59%
PIR Fund
-
-
0.0%
EDA Fund
100,000
100,000
9.8%
Equipment/Bldg Replacement
-
-
0.0%
Public Safety
52,000
52,000
5.1%
Total CIP Fund Costs
152,000
2.52%
152,000
14.93%
Total General & CIP Fund Costs
1,002,817
16.64%
1,002,817
98.53%
Underfunded Levy Costs
(Of
0.0%
(0)
0.0%
PIR Fund - Excess
180,000
180,000
17.7%
Transfer from Public Safety Capital Fund (Franchise Fees) to General Fund
(165,000)
(165,000)
-16.2%
Total Balanced Levy Costs
1,017,817
16.88%
'
100.00%
Wales and Benefits
The 2026 proposed budget assumes the following for non -union and union employees:
Non -Union Employees
• A wage adjustment of 3.0%
• A 13.9% increase for health and a 0.0% increase for dental
• A 0.0% increase for life insurance premiums
Union Employees
• A wage adjustment of 3.0%
• A 15.0% increase for health (which includes dental), with the City's contribution remaining at
87%
• A 0.0% increase for life insurance premiums
Overall, the city's cost for health insurance is increasing by $68,455, with $48,266 being allocated to
the General Fund. The number of FTE's included in the budget remains unchanged from 2025.
Total personnel costs increased by $234,086 from 2025 to 2026, with $159,297 being allocated to the
General Fund. The breakdown of this increase is as follows:
Page 2 of 7
Description Effect on Levy
Step Increases
3% COLA Adjustments
Public Works Staffing Phase 2- 1 Lead (Jan 2026 Start)
Rec on the Go
54,161
45,448
3,322
8,100
Health Insurance/Work Comp Benefits (13.9% health; 0% dental) & MN Paid Leave 48,266
Personnel Costs 159,297
The levy increase needed to cover personnel is $159,297.
General Fund
The General Fund is the primary operating fund of the City, and its main source of revenue is property
taxes. The 2026 revenue budget is projected to increase by 12.8% or $850,818 over 2025 to $7,490,088.
The main reason for this increase is a proposed property tax increase of $847,611.
Expenditures are projected to increase by $728,808 over 2025 to $7,490,087. The increase is primarily
driven by public safety and personnel costs.
• The police contract is expected to rise by 13.3%, or $233,475 for 2026. Major cost drivers include
labor contracts and increased costs related to employee health insurance, with 2026 being viewed
as an adjustment year, as employee compensation was brought in line with neighboring local
governments after a significant lag; and increased costs related to county fees for insurance and
administrative overhead/indirect costs.
Dispatch costs will be increasing by 17.4% or $12,780.
The fire operating costs are expected to rise by 17.6%, or $159,231 for 2026. This is mainly due to
the addition of 6 full-time captains; addition of 3 FTE's, step, COLA, and market adjustments; and
an increase in repairs and maintenance, all of which Arden Hills' cost share portion is 24.4%.
The levy increase needed to cover police and fire services is $405,486.
Special Revenue Funds
The City has five special revenue funds with activity in 2026 that finance various activities with
restricted revenues. The allocation of property tax dollars is $100,000 for the EDA General Fund, an
increase of $100,000 from 2025. None of the three Tax Increment Financing Funds currently receives
tax increment revenue. TIF #3 and TIF #4 have been decertified and have funds available for future
eligible projects. TIF #5 was established at the end of 2019.
Capital Proiect Funds
The Council has previously reviewed the 2026-2030 CIP. Much of this information is reflected in the
capital funds of the City. The allocation of property tax dollars is proposed to remain unchanged for
the Equipment and Building Replacement Fund at $100,000, increase by $180,000 for the Capital
Improvement (PIR) Fund ($430,000), and increase by $52,000 for the Public Safety Capital Fund
($312,000).
CIP 2025-2029
Projects included in the 2026 Proposed Budget and CIP are as follows:
Page 3 of 7
Project
Fund Source
Amount
Arden Oaks ADA Improvements
Capital Improvement
67,500
GRG Floral Park NRMB
Capital Improvement
5,225
GRG Hazelnut Park & Chatham NRMB
Capital Improvement
4,000
Hard Court & Trail Rehabilitation
Capital Improvement
200,000
Lake Johanna Blvd Trail - Planning/Design
Capital Improvement
100,000
Parks Master Plan
I Capital Improvement
10,000
Snelling Ave N. & Royal Hills Trail Improvements
Capital Improvement/Park Dedication Fees
450,000
2026 PMP
Capital hnprovement/Enterprise Funds
3,300,000
Hamline Avenue N Trail Connection Improvement
Capital Improvement/Grants
160,000
Gateway Signs
I EDA
180,000
Auto Greaser Installation for Asset 85135
Equipment/Building Replacement
11,500
Pipeline Inspection Push Camera System
Equipment/Building Replacement
12,000
Replace 1996 Redi-Haul Trailer #108
Equipment/Building Replacement
18,000
Replace 2009 Sterling Acterra Truck #431
Equipment/Building Replacement
144,500
Replace 2016 F-350 w/V--Plow and Liftgate 9215
Equipment/Building Replacement
85,000
Replace 2018 Toro Large Area Mower #457
Equipment/Building Replacement
114,000
Turf Fertilizer and Herbicide Sprayer
Equipment/Building Replacement
25,000
LJFD General Equipment
Public Safety
203,254
LJFD Rescue/Command/Utility Vehicle Replacement
Public Safety
51,240
LJFD Engine/Ladder Replacement
Public Safety
145,180
Lift Station Rehabilitation
Sewer
190,000
Lake Johanna Blvd Watermain Assessment
Water
20,000
Trunk Water Main Condition Assessment
Water
20,000
Water Meter Replacement
Water
530,000
Water System Model Update
Water
42,750
Water Tower Maintenance
Water
12,000
Total Projects
$ 6,101,149
Enterprise Funds
The City has four enterprise funds that finance business -type activities. A rate study was completed in
2018 for the Water, Sewer and Surface Water Management funds. The recommended rate increases are
reflected in the revenue budgets and will be included on the 2026 Fee Schedule for the City. The
proposed increases are as follows: Water — 4%; Sewer — 3%; Storm — 6%. Below is a comparison of
utility fees for 2024, 2025 and 2026 based on proposed rates and for a household using 9,000 gallons
per quarter with a 3/4" meter size or smaller.
Utility Charges
Water
Sewer
Storm
2024 2025 2026
$ 79.16 $ 79.16 $ 83.22
$129.06 $140.68 $149.11
$ 17.39 $ 17.91 $ 18.45
TOTAL $ 225.61 $ 237.75 $ 250.78
Property Values, Taxes and Tax Rates
At the September 29, 2025 Special City Council Meeting, Council set the preliminary levy at
$7,132,267, which is an increase of $1,104,255 or 18.32% over 2025. At that time, the preliminary levy
assumed a balanced levy increase of $1,089,255, a $180,000 PIR levy increase, plus an offset of
($165,000) from excess franchise fees.
According to information provided by Ramsey County, the median home value in Arden Hills will
increase from $480,900 for 2025 taxes to $496,400 for 2026 taxes, an increase of 3.22%. The annual
impact of an 18.32% City levy increase to a residential median home value is as follows (City tax
amount only):
Page 4 of 7
The 2025 City Tax Rate is 27.6484%. The estimated 2026 City tax rate, based on the most current
information, with an 18.32% levy increase, is 31.8656%.
Based on the changes assumed in the preliminary levy and the changes identified since the September
29, 2025 Special City Council Meeting, the annual levy would now be:
Set levy at $7,045,829 (an increase of $1,017,817 or 16.88% over 2025).
This assumes a balanced levy increase of $1,002,817, a $180,000 PIR levy increase, an offset of
($165,000) from excess franchise fees.
Another levy option has been provided below, should Council want to consider going with a lower levy.
Set levy at $6,945,829 (an increase of $917,817 or 15.23% over 2025).
This assumes a balanced levy increase of $1,002,817, a $180,000 PIR levy increase, an offset of
($165,000) from excess franchise fees, and a decrease of ($100,000) to the EDA levy (set EDA levy to
zero).
Page 5 of 7
The 2025 tax rates for other cities in Ramsey County are as follows:
2025 Tax Rates
70.00
60.00
50.00
40.00 38.04 38.23 38.45
39.56 40.38
35.80
32.09 32.38 33.23
30.40
30.00 27.65 27.90
26.65
20.00
10.00
48.35 48.98
46.32 m
52.70
65.69
oAc�c�Q ae 1�\y `ac�aa ea��a�¢ ��Qo� �e� a��aa�e �e.Q ' aJ`e� 0°e ���?�e �`.�r�Cc QoSell a�eQa � \ey�o0a S�Qao\ ��QaJ cLr�cA
\eeea. P` \eJaaca`y �� �aJ c �OJc I>q1
1 � �aQ SAP
�r
Staff is seeking direction from the City Council regarding the following items:
• The City has not yet received updated premiums for union health benefits, but the City will
continue to contribute 87% as per the labor agreement. Current assumptions include a 15.0%
health increase. What changes, if any, should staff assume?
Page 6 of 7
City Council has been discussing the City's 75th Anniversary. There are no City dollars budgeted
for this; however, there is a $10,000 placeholder budgeted for Strategic Planning. Does Council
want to transfer the $10,000 and use it towards the 75th Anniversary?
A separate scenario has been provided to reduce the $100,000 levy amount in the EDA fund.
During the October 20th Work Session, Council discussed the existing fund balance. Staff has
been directed to research and bring this back as part of the budget discussion. Staff will provide
a verbal update. What changes, if any, should staff assume?
Attachments
A. Proposed 2026 Budget
B. Proposed 2026-2030 CIP
C. Proposed 2026 Property Tax Levy PowerPoint Presentation
Page 7 of 7
Attachment A
Proposed 2026 Budget and CIP
City of Arden Hills
City Wide Budget Summary
2023 2024 9/30/2025 2025 2026 $Increase % Increase
CITY-WIDE SUMMARY Actual Actual YTD Budget Budget (Decrease) (Decrease)
REVENUES
Taxes
$ 4,711,538 $
5,415,214 $
3,307,464
$ 6,496,798
$ 7,687,431 $
1,190,633
18.3%
Special Assessments
365,662
693,060
151,713
381,784
677,641
295,858
77.5%
Licenses and permits
478,540
449,918
853,987
555,672
554,002
(1,670)
-0.3%
Intergovernmental
1,192,674
809,594
303,088
767,901
798,517
30,617
4.0%
Charges for services
7,076,165
6,852,750
3,952,369
7,567,327
7,915,395
348,069
4.6%
Fines & forfeits
24,681
27,298
17,644
17,360
24,224
6,864
39.5%
Investment earnings
927,206
843,040
322,321
50,000
50,000
-
0.0%
Miscellaneous
262,458
137,622
644,401
154,345
1,546,688
1,392,343
902.1%
Interfund Services
561,412
519,429
435,497
657,150
677,070
19,920
3.0%
Transfers in
471,140
350,000
(180,567)
350,000
400,000
50,000
14.3%
TOTAL REVENUES
$ 16,071,477 $
16,097,924 $
9,807,917
$ 16,998,337
$ 20,330,969 $
3,332,633
19.6%
EXPENDITURES/EXPENSES
General Government
$ 1,384,004 $
1,598,573 $
1,124,296
$ 1,746,002 $
1,868,185 $
122,183
7.0%
Public Safety
2,704,009
2,824,302
2,470,102
3,124,119
3,584,655
460,536
14.7%
Public Works
682,508
716,138
519,367
960,790
946,124
(14,666)
-1.5%
Parks & Recreation
721,288
751,837
758,211
1,027,568
1,140,763
113,195
11.0%
Economic Development
81,789
307,333
61,379
90,652
289,139
198,487
219.0%
Capital Outlay
1,415,959
5,192,455
3,968,099
2,410,807
4,013,149
1,602,342
66.5%
Enterprise Funds
5,685,686
5,703,267
4,172,627
8,953,935
8,328,868
(625,068)
-7.0%
Internal Service Funds
563,679
526,717
461,873
676,650
696,570
19,920
2.9%
TOTAL EXPENDITURES/EXPENSES
$ 13,238,922 $
17,620,622 $
13,535,953
$ 18,990,523 $
20,867,452 $
1,876,929
9.9%
NET CHANGES IN FUND BALANCE
$ 2,832,555 $
(1,522,698) $
(3,728,036) $ (1,992,186) $
(536,483) $
1,455,703
2
City Wide Budget Summary Cont'd
CITY-WIDE SUMMARY
General Fund
Special Revenue
Funds
Capital Project
Funds
Enterprise
Funds
Internal Service
Funds
Total Budget
2026
Total Budget
2025
Percent
Change
REVENUES
Taxes
Property taxes
$
6,206,857
$ 100,000
$ 842,000
$
$
$ 7,148,857
$ 5,955,549
20.0%
Tax increments
-
-
-
-
-
0.0%
Othertaxes
11,574
92,000
435,000
538,574
541,249
-0.5%
Special assessments
-
-
671,501
6,140
677,641
381,784
77.5%
Licenses and permits
548,472
-
-
5,530
554,002
555,672
-0.3%
Intergovernmental
165,379
582,591
50,547
798,517
767,901
4.0%
Charges for services
470,251
1,000
7,444,145
7,915,395
7,567,327
4.6%
Fines & forfeits
24,224
-
-
24,224
17,360
39.5%
Investment earnings
50,000
-
-
50,000
50,000
0.0%
Miscellaneous
13,330
1,516,000
17,358
1,546,688
154,345
902.1%
Interfund Services
-
-
-
677,070
677,070
657,150
3.0%
Transfers in
-
100,000
300,000
-
-
400,000
350,000
14.3%
TOTAL REVENUES
$
7,490,088
$ 292,000
$ 4,348,092
$ 7,523,720
$ 677,070
$ 20,330,969
$ 16,998,337
19.6%
EXPENDITURES/EXPENSES
General Government
$
1,718,545
$ 149,640
$
$ -
$
$ 1,868,185
$ 1,746,002
7.0%
Public Safety
3,584,655
-
3,584,655
3,124,119
14.7%
Public Works
946,124
946,124
960,790
-1.5%
Parks & Recreation
1,140,763
-
1,140,763
1,027,568
11.0%
Economic Development
-
289,139
289,139
90,652
219.0%
Capital Outlay
100,000
-
3,913,149
-
4,013,149
2,410,807
66.5%
Enterprise Funds
-
-
8,328,868
-
8,328,868
8,953,935
-7.0%
Internal Service Funds
-
-
-
-
696,570
696,570
676,650
2.9%
TOTAL EXPENDITURES/EXPENSES
$
7,490,087
$ 438,779
$ 3,913,149
$ 8,328,868
$ 696,570
$ 20,867,452
$ 18,990,523
9.9%
NET CHANGES IN FUND BALANCE
$
0
$ (146,779) $
434,943
$ (805,148) $ (19,500) $ (536,483) $ (1,992,186)
3
CITY OF ARDEN HILLS, MINNESOTA
GENERAL GOVERNMENT SUMMARY
EXPENDITURE ANALYSIS
2025
PERCENT
2023
2024
ORIGINAL
2026
OVER(UNDER)
Total By Program
ACTUAL
ACTUAL
BUDGET
BUDGET
2023 BUDGET
City Council
$ 71,926
$ 80,035
$ 93,819
$ 95,743
2.1%
City Administration
437,233
507,785
506,835
514,881
1.6%
Elections
31,056
32,141
61,750
35,906
-41.9%
Finance
161,040
163,075
220,756
235,194
6.5%
TCAAP
77,657
119,702
121,920
139,170
14.1 %
Planning & Zoning
227,805
307,494
352,790
447,410
26.8%
Government Buildings
228,815
224,822
240,932
250,242
3.9%
Totals
1,235,531
1,435,052
1,598,802
1,718,545
7.5%
Total By Classification
Personnel Services
604,961
642,860
771,400
804,688
4.3%
Commodities
60,639
101,143
91,180
101,180
11.0%
Contractual Services
530,501
654,373
684,302
753,507
10.1 %
Capital Outlay
0
0
0
0
N/A
Other Charges
0
0
0
0
N/A
Totals
1,196,101
1,398,376
1,546,882
1,659,375
7.3%
Staffing
Full-time equivalents 4.38 4.29 5.13 5.14
2,000
1,800
1,600
s 1,400
1,200
1,000
Expenditures 800
600
400
200
0
ACTUAL ACTUAL BUDGET BUDGET
2023 2024 ORIGINAL 2026
2025
4
CITY OF ARDEN HILLS, MINNESOTA
Function: General Government
Activity: Mayor & Council
2026 BUDGET
Fund # 101
Activity # 41100
Activity Scope
The Mayor and City Council are responsible for the formulation of policy and the passage of laws governing the
City of Arden Hills. Members participate in various committees, as well as direct staff, through the City
Administrator, as to their overall goals for the City. This department provides for Mayor and Council
compensation, Council meetings and work sessions, management consultants and memberships. When
applicable, participation in NYFS is included in this budget, as is funding for the City Council Retreat Facilitator.
Objectives
1. Adopt policies and ordinances consistent with Council's position on growth, zoning and financial strategy.
2. Continue to work on the redevelopment of the TCAAP property.
Issues
Creating funding sources to build reserve balances to fund future capital improvements while maintaining current
City services.
Budget Commentary
In 2026, the Mayor and Council budget is proposed to increase by 2.1 % or $1,924 due to the slight increase to the
NYFS contract.
2023
2024
2025
2026
Budget Summary
ACTUAL
ACTUAL
BUDGET
BUDGET
Personnel Services
$ 37,231
$ 37,139
$ 41,070
$ 41,070
Commodities
-
259
-
-
Contractual Services
34,694
42,636
52,749
54,673
Total
$ 71,926
$ 80,035
$ 93,819
$ 95,743
Percent Change
11.3%
17.2%
2.1 %
NYFS amount included above
-
16,661
23,304
25,203
Expenditures by Classification
11
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: General Government Fund # 101
Activity: Administration Activity # 41300
Activity Scope
City Administration provides the overall direction of the City, as determined by the City Council. The City
Administrator serves as Chief Administrative Officer for the City, ensuring that laws, ordinances, and resolutions of
the City Council are enforced and implemented. The Administration Department is responsible for administering
Council policies, coordinating Council agendas, and providing support to other functional areas within the City.
Objectives
1. Assist City Council in setting policies and procedures in accordance with Council's position.
2. Provide direction and leadership on major city projects, budget management, oversee performance evaluations
and long-range planning.
Issues
1. Long-range planning to maintain current City services while creating funding sources for reserves.
2. Long-range comprehensive TCAAP planning.
Budget Commentary
The 2026 Administration budget is increasing by 1.6% over 2025. The change in personnel services is due to
step, COLA, and insurance benefit changes (which includes implementation of the MN Paid Leave program). The
increase in contractual services is primarily due to legal fees, which is based on a rolling 3-year average.
Budaet Summary
Personnel Services
Commodities
Contractual Services
Total
Percent Change
2023
A PST I IAI
$ 264,777
172,456
2024
A -1 IAI
$ 266,024
241,761
2025
nI 1--
$ 318,880
187,955
2026
I-1 I 1 - r T
$ 311,465
203,416
w w w w
16.1 % (-0.2%) 1.6%
Full -Time Equivalent positions 2.03 1.79 2.22 2.22
Expenditures by Classification
11
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: General Government Fund # 101
Activity: Elections Activity # 41410
Activity Scope
This department covers the cost of administering all Federal, State and Municipal elections. This includes the
preparation of any and all absentee ballots, organizing the polling places, election judges, and vote tabulations. The
City contracts with Ramsey County for all the required election services.
Objectives
Stay current on election laws.
Issues
Stay current on election laws.
Budget Commentary
The Elections budget has a -41.9% or $25,844 decrease for FY26.
Budaet Summary
Personnel Services
Commodities
Contractual Services
Total
Percent Change
Expenditures by Classification
2023
2024
2025
2026
ACTUAL
ACTUAL
BUDGET
BUDGET
31,056
32,141
61,750
35,906
$ 31,056
$ 32,141
$ 61,750
$ 35,906
3.5%
92.1 %
(41.9%)
o Personnel Services
o Commodities
oContractual Services
100%
tl
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: General Government Fund # 101
Activity: Finance Activity # 41500
Activity Scope
Conducts the financial affairs of the City in accordance with the Government Accounting Standards Board (GASB)
and Generally Accepted Accounting Principles (GAAP). This includes protecting the assets of the City, the
initiation of financial plans, investment and debt management, review and implementation of internal controls, and
accounting for financial transactions including accounts payable, accounts receivable and payroll.
Objectives
1. Continue working to refine the financial management plan for the City.
2. Continue to produce an Annual Comprehensive Financial Report (ACFR) and reports for the public (Popular
Annual Finance Report - PAFR) that receive the GFOA's award for excellence in reporting.
3. Provide meaningful and timely financial reports and information to Council, Commissions and other City
Departments.
Issues
1. Implement improved reporting procedures to inform Council, Commissions and Departments.
2. Work with other Departments to find ways to reduce costs of City operations.
3. Analyze and implement ways to reduce transaction processing and costs.
Budget Commentary
This budget increased by 6.5% in 2026 or $14,438. The increase in personnel services is due to step, COLA, and
insurance benefit increases. The increase in Contractual Services is due to server migration costs for the City's
ERP System, Spingbrook.
Budget Summary
Personnel Services
Commodities
Contractual Services
Total
Percent Change
Full -Time Equivalent positions
Expenditures by Classification
2023
2024
2025
2026
ACTUAL
ACTUAL
BUDGET
BUDGET
$ 73,619
$ 76,769
$ 106,890
$ 112,800
11,505
9,815
12,000
12,000
75,916
76,491
101,866
110,394
$ 161,040
$ 163,075
$ 220,756
$ 235,194
1.3%
35.4%
6.5%
nFR
nra
n77
n77
8%
o Personnel Services
0 Commodities
o Contractual Services
5%
8
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: General Government Fund # 101
Activity: TCAAP Activity # 41600
Activity Scope
This department was established to account for revenue and expenditure activity related to the City's
comprehensive re -use planning at the Twin Cities Army Ammunition Plant (TCAAP) site.
Objectives
1. Coordination of TCAAP redevelopment planning activities while continuing to meet the needs of the City of Arden
Hills.
2. Work with Ramsey County through the Joint Development Authority (JDA).
Issues
1. Economic conditions.
2. Coordinating with multiple entities/players.
Budget Commentary
Ramsey County purchased the property and established a Joint Development Authority (JDA) with the City.
Placeholders for consultant costs have been included, and staff time has been allocated for City Administration,
Community Development, and Public Works as they act as the City's support staff to this Authority. The 2026
budget shows an increase of 14.1 % or $17,250.
Budaet Summary
Personnel Services
Commodities
Contractual Services
Total
Percent Change
Full -Time Equivalent positions
Expenditures by Classification
2023
2024
2025
2026
ACTUAL
ACTUAL
BUDGET
BUDGET
$ 39,431
$ 36,677
$ 51,920
$ 59,170
38,226
83,025
70,000
80,000
$ 77,657
$ 119,702
$ 121,920
$ 139,170
54.1%
1.9%
14.1%
9
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: General Government Fund # 101
Activity: Planning & Zoning Activity # 41910
Activity Scope
Responsible for all planning and zoning related functions of the City. Activities administered by this department
include requests for variances, subdivisions, re -zonings, zoning code amendments, signs, conditional use permits,
compliance with City Ordinances and other land use issues. The Planners work closely with Protective
Inspections, Code Enforcement, and Community Development.
The Planning Commission, consisting of seven members appointed annually by the City Council, meets monthly
to review the above requests and to make recommendations to the City Council in an advisory capacity.
Objectives
1. Continue to work on Rental Housing registrations.
2. Continue improvements of the City's planning process.
Issues
1. Rental Housing registrations.
2. Refine Building Permit process.
3. Research and refine an Administrative Fines process.
Budget Commentary
The budget for 2026 is an increase of 26.8% over the 2025 budget. Contractual services includes $60,000 for the
City's Permit Software conversion.
2023
2024
2025
2026
Budget Summary
ACTUAL
ACTUAL
BUDGET
BUDGET
Personnel Services
$ 190,620
$ 228,094
$ 264,470
$ 295,840
Commodities
123
-
-
-
Contractual Services
37,062
79,400
88,320
151,570
Total
$ 227,805
$ 307,494
$ 352,790
$ 447,410
Percent Change
35.0%
14.7%
26.8%
Full -Time Equivalent positions
1.51
1.66
1.89
1.89
Expenditures by Classification
34%
13 Personnel Services
o Commodities
13Contractual Services
66%
its
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: General Government Fund # 101
Activity: Government Buildings Activity # 41940
Activity Scope
This department captures all of the operation/maintenance related costs for the City Hall and Government Building
facilities.
The City entered into a contract with Ramsey County for a joint maintenance facility located just west of City Hall off
County Road 96 on Paul Kirkwold Drive. The new facility was completed and occupied as of October 2004. 45% of
the City's portion of the Ramsey County maintenance facility is charged to this budget.
Objectives
Maintain a reputable facility to house meetings and staff.
Issues
Normal maintenance and repair issues as the building (City Hall) has now been in operation since 2002.
Budget Commentary
The 2026 budget is an increase of 3.9% from the previous year's budget primarily due to anticipated rent increase
for the Public Works maintenance facility.
Budaet Summary
Personnel Services
Commodities
Contractual Services
Total
Percent Change
Full -Time Equivalent positions
Expenditures by Classification
2023
ACTUAL
$ 38,713
10,786
179,316
2024
ACTUAL
$ 34,834
8,045
181,943
2025
BUDGET
$ 40,090
9,180
191,662
2026
BUDGET
$ 43,513
9,180
197,549
17%
4%
o Personnel Services
o Commodities
oContractual Services
11
CITY OF ARDEN HILLS, MINNESOTA
PUBLIC SAFETY SUMMARY
EXPENDITURE ANALYSIS
2025
PERCENT
2023
2024
ORIGINAL
2026
OVER(UNDER)
Total By Program
ACTUAL
ACTUAL
BUDGET
BUDGET
2023 BUDGET
Police
$ 1,491,764
$ 1,583,188
$ 1,761,288
$ 1,994,763
13.3%
Dispatch
68,737
70,394
73,570
86,350
17.4%
Fire
751,177
833,933
906,321
1,065,552
17.6%
Emergency Management
8,587
5,134
9,780
9,290
-5.0%
Protective Inspections
383,744
331,654
373,160
428,700
14.9%
Totals
2,704,009
2,824,302
3,124,119
3,584,655
14.7%
Total By Classification
Personnel Services
662
1,226
1,250
1,250
0.0%
Commodities
1,598,810
1,632,815
1,830,458
2,073,623
13.3%
Contractual Services
819,914
904,327
979,891
1,151,902
17.6%
Capital Outlay
0
0
0
0
N/A
Other Charges
0
0
0
0
N/A
Totals
2,419,387
2,538,368
2,811,599
3,226,775
14.8%
Staffing
Full-time equivalents 0.00 0.00 0.00 0.00
N 4,000
3,500
c 3,000
2,500
2,000
1,500
Expenditures 1,000
500 21 A
0
ACTUAL ACTUAL BUDGET BUDGET
2023 2024 ORIGINAL 2026
2025
ifs:
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Safety Fund # 101
Activity: Police Activity # 42100
Activity Scope
Law Enforcement services for Arden Hills are provided on a contractual basis with the Ramsey County Sheriff's
Department. Animal control services are included in this budget.
Objectives
Continue contracting for law enforcement and animal control services.
Issues
1. Resident concerns over police coverage and visibility.
2. Response times.
Budget Commentary
Arden Hills' portion of the Ramsey County Sheriff's Contracting Communities 2026 budget increased 13.3% or
$233,475 over 2025. Animal control costs and boarding are included within this budget.
2023
2024
2025
2026
Budget Summary
ACTUAL
ACTUAL
BUDGET
BUDGET
Personnel Services
$ -
$ -
$ -
$ -
Commodities
-
-
-
-
Contractual Services
1,491,764
1,583,188
1,761,288
1,994,763
Total
$ 1,491,764
$ 1,583,188
$ 1,761,288
$ 1,994,763
Percent Change
6.1 %
11.2%
13.3%
Expenditures by Classification
o Personnel Services
o Commodities
oContractual Services
100%
13
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Safety Fund # 101
Activity: Dispatch Activity # 42150
Activity Scope
Emergency dispatch services are provided by Ramsey County.
Objectives
Continue contracting dispatch services.
Issues
Continue to maintain service levels at a reasonable cost.
Budget Commentary
Arden Hills' portion of the Ramsey County 911 Dispatch Department operating budget increased by 17.4%.
2023
2024
2025
2026
Budget Summary
ACTUAL
ACTUAL
BUDGET
BUDGET
Personnel Services
$ -
$ -
$ -
$ -
Commodities
-
-
-
-
Contractual Services
68,737
70,394
73,570
86,350
Total
$ 68,737
$ 70,394
$ 73,570
$ 86,350
Percent Change
2.4%
4.5%
17.4%
Expenditures by Classification
100%
o Personnel Services
o Commodities
13Contractual Services
14
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Safety Fund # 101
Activity: Fire Activity # 42200
Activity Scope
Fire protection for Arden Hills is provided by the Lake Johanna Fire Department on a contractual basis. Lake
Johanna Fire Department presently provides services to the cities of Arden Hills, Shoreview, and North Oaks.
Arden Hills pays a percentage of operating and capital costs based on a formula approved by the Lake Johanna
Fire Department and Arden Hills City Council.
Objectives
Continue contracting for fire protection services.
Issues
Continue to maintain service levels at a reasonable cost.
Budget Commentary
Arden Hills' portion of the Lake Johanna Fire Department operating budget increased 17.6%. This budget reflects
increases to operating costs.
2023
2024
2025
2026
Budget Summary
ACTUAL
ACTUAL
BUDGET
BUDGET
Personnel Services
$ -
$ -
$ -
$ -
Commodities
-
-
-
-
Contractual Services
751,177
833,933
906,321
1,065,552
Total
$ 751,177
$ 833,933
$ 906,321
$ 1,065,552
Percent Change
11.0%
8.7%
17.6%
Expenditures by Classification
o Personnel Services
o Commodities
0Contractual Services
100%
W
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Safety Fund # 101
Activity: Emergency Management Activity # 42300
Activity Scope
Emergency Management coordination for the City is required by the Federal Government. This department works
closely with Ramsey County Department of Homeland Security, as well as the Ramsey County Sheriff and Lake
Johanna Fire Department. The City contracts with a consultant to provide these services.
Objectives
1. Update City's Emergency Response Policy and Procedures.
2. Train staff in emergency management procedures.
Issues
Coordinate with Ramsey County's emergency response procedures and policies.
Budget Commentary
The 2026 budget is a decrease of -5.0% from the 2025 budget or -$490.
Budaet Summary
Personnel Services
Commodities
Contractual Services
Total
Percent Change
Full -Time Equivalent positions
Expenditures by Classification
2023 2024 2025 2026
ACTUAL ACTUAL BUDGET BUDGET
$ 5,164 $ 4,322 $ 8,130 $ 7,640
3,423 811 1,650 1,650
(-40.2%) 90.5% (-5.0%)
i[.
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Safety Fund # 101
Activity: Protective Inspections Activity # 42400
Activity Scope
This department is responsible for all building construction, plumbing, sewer, water and mechanical inspections
within the City. Electrical inspections are contracted with an independent inspection firm. This department is also
responsible for enforcement of the Zoning Code and other sections of the City Code of Ordinances.
Objectives
1. Continue implementation of the building codes.
2. Continue to work on Building Permit software to produce Council reports.
Issues
1. Managing and prioritizing department workloads.
2. Keep up with rental license inspections of investor owned residential properties.
3. Continue implementation and design of new Building Permit software and reports.
Budget Commentary
The 2026 operating budget is an increase of 14.9% or $55,540 from the previous year's budget, driven by
personnel (step, COLA, and insurance benefit increases), technology, and credit card fee allocations.
2023
2024
2025
2026
Budget Summary
ACTUAL
ACTUAL
BUDGET
BUDGET
Personnel Services
$ 279,459
$ 281,612
$ 304,390
$ 350,240
Commodities
662
1,226
1,250
1,250
Contractual Services
103,623
48,816
67,520
77,210
Total
$ 383,744
$ 331,654
$ 373,160
$ 428,700
Percent Change
(-13.6%)
12.5%
14.9%
Full -Time Equivalent positions
2.50
2.58
2.74
2.74
Expenditures by Classification
18%
O Personnel Services
O Commodities
13Contractual Services
82%
17
CITY OF ARDEN HILLS, MINNESOTA
PUBLIC WORKS SUMMARY
EXPENDITURE ANALYSIS
2025
PERCENT
2023
2024
ORIGINAL
2026
OVER(UNDER)
Total By Program ACTUAL
ACTUAL
BUDGET
BUDGET
2023 BUDGET
Streets $ 682,508
$ 716,138
$ 960,790
$ 946,124
-1.5%
Totals 682,508
716,138
960,790
946,124
-1.5%
Total By Classification
Personnel Services
337,706
363,274
439,340
450,204
2.5%
Commodities
59,540
26,243
66,000
74,000
12.1 %
Contractual Services
285,261
326,621
455,450
421,920
-7.4%
Capital Outlay
0
0
0
0
N/A
Other Charges
0
0
0
0
N/A
Totals
682,508
716,138
960,790
946,124
-1.5%
Staffing
Full-time equivalents 2.40 2.45 2.61 2.79
1,200
N 1,000
3
s 800
H
Expenditures 600
400
200
0
ACTUAL ACTUAL BUDGET BUDGET
2023 2024 ORIGINAL 2026
2025
iE:
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Works Fund # 101
Activity: Street Maintenance Activity # 43100
Activity Scope
This department is responsible for maintaining City streets, including snowplowing, minor street repair, street
signs, and street sweeping.
Objectives
1. Maintain street infrastructure utilizing all available techniques including crack sealing, seal coating, patching
and overlays.
2. Recommend a cost effective program for reconstructing/reclaiming street surfaces when maintenance
techniques no longer provide the desired results.
3. Maintain and update equipment and vehicles.
Issues
1. Implement a capital improvement program for City infrastructure.
2. Balance the public works department needs with available funds.
3. Aging equipment.
4. Increased safety regulation for equipment and vehicles.
Budget Commentary
The 2026 operating budget is a decrease of $14,666 from the previous year's budget. Personnel service
increases are due to step, COLA, and insurance benefit increases. Adjustments were made to contractual
services for Street Maintenance (seal coating/resurfacing).
Budaet Summary
Personnel Services
Commodities
Contractual Services
Total
Percent Change
Full -Time Equivalent positions
Expenditures by Classification
8%
2023
$ 337,706
59,540
285.261
2024
ACTUAL
$ 363,274
26,243
326.621
2025
$ 439,340
66,000
455.450
2026
$ 450,204
74,000
421.920
4.9% 34.2% (-1.5%)
2.40 2.45 2.61 2.79
47%
OPersonnel Services
OCommodities
OContractual Services
iK
CITY OF ARDEN HILLS, MINNESOTA
PARKS & RECREATION SUMMARY
EXPENDITURE ANALYSIS
2025
PERCENT
2023
2024
ORIGINAL
2026
OVER(UNDER)
Total By Program
ACTUAL
ACTUAL
BUDGET
BUDGET
2023 BUDGET
Recreation
$ 176,655
$ 195,101
$ 337,508
$ 378,008
12.0%
Parks
544,634
556,736
690,060
762,755
10.5%
Totals
721,288
751,837
1,027,568
1,140,763
11.0%
Total By Classification
Personnel Services
364,763
396,562
513,540
539,245
5.0%
Commodities
112,797
92,799
104,628
125,188
19.7%
Contractual Services
117,252
121,308
147,020
176,690
20.2%
Capital Outlay
0
0
0
0
N/A
Other Charges
0
0
0
0
N/A
Totals
594,812
610,669
765,188
841,123
9.9%
Staffing
Full-time equivalents 2.98 3.01 3.43 3.73
N 1,200
N 1,000
3
t 800
F
600
Expenditures
400
200
0
ACTUAL ACTUAL BUDGET BUDGET
2023 2024 ORIGINAL 2026
2025
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Parks and Recreation Fund # 101
Activity: Recreation Activity # 45120
Activity Scope
This department provides all recreational activities to residents of Arden Hills, as well as residents from neighboring
communities.
Objectives
To provide recreational activities to residents of Arden Hills.
Issues
1. Develop senior programming.
2. Budget constraints.
Budget Commentary
The 2026 operating budget is an increase
of 12.0% from the
previous year's budget.
This is mainly due to step,
COLA, and insurance benefit increases.
Additionally, 2026 includes
the fte allocation for a full -year
cost for the
Parks & Recreation Manager position.
2023
2024
2025
2026
Budget Summary
ACTUAL
ACTUAL
BUDGET
BUDGET
Personnel Services
$ 126,476
$ 141,167 $
262,380
$ 299,640
Commodities
15,360
17,172
22,250
22,680
Contractual Services
34,818
36,762
52,878
55,688
Total
$ 176,655
$ 195,101 $
337,508
$ 378,008
Percent Change
10.4%
73.0%
12.0%
Full -Time Equivalent positions
1.26
1.10
1.79
1.99
% of costs covered by revenue
37.2%
32.5%
21.4%
18.6%
Expenditures by Classification
21
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Parks and Recreation
Activity: Park Maintenance
Fund # 101
Activity # 45200
Activity Scope
Responsible for maintenance of City parks and trails as well as administration of the diseased tree/forestry
program. This includes maintaining and improving playground and picnic facilities, fertilizing and mowing of grass,
maintaining athletic fields, flooding and maintenance of outdoor ice rinks, snow and ice removal, and tree
preservation within the parks system of the City. These assets of the City are extensively used by the residents,
and improvements must be made to uphold the safety, functionality and beauty the City represents.
Objectives
1. Continue pathway maintenance.
2. Continue implementing City's Comprehensive Park and Trails plan.
Issues
1. Other maintenance concerns coming up and not allowing completion of existing projects.
2. Budget constraints for future and existing projects.
Budget Commentary
The 2026 operating budget is an increase of 10.5% from the previous year's budget. This is mainly due to
allocation, step, COLA, temp wages, insurance benefit increases, and the fte allocation for the full year cost for the
Parks & Recreation Manager position.
Budget Summary
Personnel Services
Commodities
Contractual Services
2023
ACTUAL
$ 349,403
77,978
117,252
2024
ACTUAL
$ 379,390
56,038
121,308
2025
BUDGET
$ 491,290
51,750
147,020
2026
BUDGET
$ 516,565
69,500
176,690
Total
$ 544,634 $ 556,736
$ 690,060
$ 762,755
Percent Change
2.2%
23.9%
10.5%
Full -Time Equivalent positions
2.98 3.01
3.43
3.73
Expenditures by Classification
`VJ
CITY OF ARDEN HILLS, MINNESOTA
MISCELLANEOUS SUMMARY
EXPENDITURE ANALYSIS
2025
PERCENT
2023
2024
ORIGINAL
2026
OVER(UNDER)
Total By Program ACTUAL
ACTUAL
BUDGET
BUDGET
2023 BUDGET
Unallocated $ 171,140
$ 50,000
$ 50,000
$ 100,000
100.0%
Totals 171,140
50,000
50,000
100,000
100.0%
Total By Classification
Personnel Services
- - - - N/A
Commodities
- - - - N/A
Contractual Services
- - - - N/A
Capital Outlay
- - - - N/A
Other Charges
171,140 50,000 50,000 100,000 100.0%
Totals
171,140 50,000 50,000 100,000 100.0%
Staffing
Full-time equivalents 0.00 0.00 0.00 0.00
200
a
3
0
Expenditures 100
0
ACTUAL ACTUAL BUDGET BUDGET
2023 2024 ORIGINAL 2026
2025
23
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Unallocated Fund # 101
Activity: Transfers Activity # 49300
Activity Scope
The transfers to other funds budget is utilized to account for the transfer of general fund revenues to other funds
within the City financial structure.
Objectives
1. To build reserves for capital equipment replacement.
2. To subsidize infrastructure improvements.
Issues
Budget constraints
Budget Commentary
This budget is used to account for transfers out of the General Fund to other funds of the City. $102,540 and
$171,140 was transferred to the PIR fund in 2022 and 2023 respectively. Both the 2024 and 2025 budgets included
a transfer to the Cable Fund of $50,000. The 2026 budget includes a transfer to the Cable Fund of $100,000.
Budaet Summary
Personnel Services
Commodities
Contractual Services
Other Charges
Total
Percent Change
Expenditures by Classification
2023 2024 2025 2026
171,140 50,000 50,000 100,000
$ 171,140 $ 50,000 $ 50,000 $ 100,000
(-70.8%) 0.0% 100.0%
o Personnel Services
o Commodities
oContractual Services
13 Other Charges
100%
24
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: General Government Fund # 228
Activity: Cable TV Activity # 41960
Activity Scope
This Special Revenue Fund accounts for revenue and expenditures related to cable TV, internet, and other forms of
communication. Revenue for this fund comes primarily from cable owner franchise fees.
Objectives
1. Completion of the transferring of City files to Laserfiche.
2. Maintaining audio equipment in Council chambers.
Issues
1. Workloads and budget constraints.
2. Maintaining equipment for Council meetings and televising.
Budget Commentary
The 2026 budget has increased overall by 1.7% or $2,440.
Budaet Summa
Personnel Services
Commodities
Contractual Services
Capital Outlay
Other Charges
Total
Percent Change
Full -Time Equivalent positions
Expenditures by Classification
2023
ACTUAL
$ 56,712
327
89,801
1,633
2024 2025 2026
$ 64,258 $ 51,510 $ 53,420
- 2,000 2,000
96,277 93,690 94,220
2,985 - -
10.1 % (-10.0%) 1.7%
0.46 0.49 0.35 0.35
1%
o Personnel Services
o Commodities
13Contractual Services
o Capital Outlay
■Other Charges
PR
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Economic Development
Activity: EDA General
Fund # 250
Activity # 47300
Activity Scope
This Special Revenue Fund accounts for general administration activities that are not specific to any individual
Tax Increment Financing (TIF) District, as well as activities associated with the Economic Development
Commission and Economic Development Authority.
Objectives
1. Consider placement and construction of Gateway Signs.
2. Consider the use of TIF District 3 funds for low to moderate housing needs.
3. Review the operating budget and identify a sustainable funding source.
4. Continue to grow and evolve the business retention program.
Issues
1. Consistent administration of the City's polices, plan, ordinances, guidelines, statutes, etc.
2. Promotion of available industrial property.
Budget Commentary
The primary revenue source for this fund is property taxes. The biggest contributor to Contractual Services is an
administrative charge for overhead costs associated with Administration, Finance and Government Building
departments in the General Fund. Capital Outlay anticipated charges are for Gateway Signs.
2023
2024
2025
2026
Budget Summary
ACTUAL
ACTUAL
BUDGET
BUDGET
Personnel Services
$ 57,230
$ 55,725
$ 66,370
$ 76,880
Commodities
482
374
-
-
Contractual Services
20,827
21,894
18,582
26,559
Capital Outlay
-
-
-
180,000
Other Charges
Total $ 78,539 $ 77,993 $ 84,952 $ 283,439
Percent Change (-0.7%) 8.9% 233.6%
Full -Time Equivalent positions 0.36 0.32 0.38 0.38
Expenditures by Classification
13Personnel Services
27%
oCommodities
oContractual Services
oCapital Outlay
9% ■Other Charges
141.
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Economic Development Fund # 253
Activity: TIF #3 Cottage Villas Activity # 47305
Activity Scope
TIF District No. 3, Cottage Villas Housing, was originally certified as a Housing District on May 10, 1993. This 64
unit Cottage Villas Apartment complex is available for low -moderate income seniors. Originally, this district was set
to decertify on December 31, 2009. In December 2009, the City Council extended this district until December 31,
2019, to allow the City the possibility of using these funds for other affordable housing projects within the City.
Objectives
Utilize available funds for low to moderate income housing projects.
Issues
Ensure use of funds is consistent with TIF laws.
Budget Commentary
The City no longer has any obligations to pay the developer as of February 1, 2010. Only administrative costs have
been planned for 2026, with no change from 2025.
2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET
Personnel Services $ - $ - $ -
Commodities - - -
Contractual Services 1,083 1,645 1,900
Capital Outlay - - -
Other Charges - - -
Total $ 1,083 $ 1,645 $ 1,900
Percent Change 51.8% 15.5%
Expenditures by Classification
2026
ni lm�
1,900
$ 1,900
0.0%
o Personnel Services
o Commodities
13Contractual Services
o Capital Outlay
■Other Charges
100%
27
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Economic Development Fund # 254
Activity: TIF #4 Presbyterian Homes Activity # 47308
Activity Scope
TIF district No. 4, Presbyterian Homes, was established as a 15 year renewal and renovation district to facilitate the
redevelopment of existing senior housing units and replacement of existing nursing home units. The first increment
was received in 2014 with the districted set to expire on December 31, 2029. The district was decertified early on
December 31, 2022.
Objectives
Utilize funds for Presbyterian Homes project per the development agreement.
Issues
Ensure compliance with TIF laws for uses of available funds.
Budget Commentary
Increment was received starting in 2014. The TIF note was paid in full to the developer in 2022. Only
administrative costs have been planned for 2026, with no change from 2025.
2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET
Personnel Services $ - $ - $ -
Commodities - - -
Contractual Services 1,084 225,885 1,900
Depreciation - - -
Other Charges - - -
Total $ 1,084 $ 225,885 $ 1,900
Percent Change 20743.1 % (-99.2%)
Expenditures by Classification
2026
ni lm�
1,900
$ 1,900
0.0%
13Personnel Services
o Commodities
13Contractual Services
o Depreciation
■Other Charges
100%
P�:
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Economic Development Fund # 255
Activity: TIF #5 Activity # 47309
Activity Scope
TIF district No. 5, TCAAP, was established pursuant to special legislation as a 30 year redevelopment district to
facilitate a mixed -use development. The first increment was anticipated in 2023 with the districted terminating no
later than 2053.
Objectives
Utilize funds as able for mixed -use development on the TCAAP property. The City first needs to ensure they have
sufficient tax revenues to cover increased costs due to the development. Once it is determined those costs are
covered, TIF applications can be considered.
Issues
Ensure compliance with TIF laws for uses of available funds.
Budget Commentary
This district was established in December 2019. Only administrative costs have been planned for 2026, with no
change from 2025.
2023 2024 2025
Budget Summary ACTUAL ACTUAL BUDGET
Personnel Services $ - $ - $ -
Commodities - - -
Contractual Services 1,084 1,810 1,900
Depreciation - - -
Other Charges - - -
Total $ 1,084 $ 1,810 $ 1,900
Percent Change 67.0% 5.0%
Expenditures by Classification
2026
ni lm�
1,900
$ 1,900
0.0%
13Personnel Services
o Commodities
13Contractual Services
o Depreciation
■Other Charges
100%
Pis;
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: General Government Fund # 408
Activity: Equipment & Building Replacement Activity # 48100
Activity Scope
This Capital Fund was created in 2008 with the intent of building a reserve to fund equipment replacement, building
improvements, office equipment, and technology improvements. This use of the fund would level future levy spikes
caused by acquisition of costly capital expenditures. A one-time transfer of $500,000 was completed in 2008 from
the General Fund to establish the reserve. Annual transfers from the Enterprise Funds and property taxes provide
on -going revenues in addition to interest income.
Objectives
Provide adequate equipment to ensure operations and services for the residents of Arden Hills.
Issues
Budget constraints.
Budget Commentary
Anticipated 2026 expenditures include the replacement of the 2009 Sterling Acterra Truck and the 2016 F-350 w/V-
Plow and Liftgate, in addition to replacements of a Toro Large Area Mower and a Redi-Haul Trailer. Also included is
a Turf Fertilizer and Herbicide Sprayer, a Pipeline Inspection Push Camera System, and an Auto Greaser
Installation (see CIP).
2023 2024 2025 2026
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services $ - $ - $ - $ -
Commodities - - - -
Contractual Services - - - -
CapitalOutlay 231,359 528,084 663,170 410,000
Other Charges - - - -
Total $ 231,359 $ 528,084 $ 663,170 $ 410,000
Percent Change 128.3% 25.6% (-38.2%)
Expenditures by Classification
❑ Personnel Services
❑ Commodities
❑Contractual Services
❑ Capital Outlay
■Other Charges
100%
Kit;
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Parks and Recreation Fund # 409
Activity: Parks Activity # 45200
Activity Scope
This Fund was established for park/trail acquisition and development. Revenue for the Parks Fund comes from
developer park dedication fees, contributions, state grants, and investment income.
Objectives
1. Playground structure replacement.
2. Mounds View High School trail connection.
3. Hard court maintenance.
Issues
1. Securing funding for improvements.
2. Adhering to grant requirements and local matches.
3. Budget constraints.
Budget Commentary
Anticipated expenditures for 2026 is for the City's tree sale partnership with Tree Trust.
2023 2024 2025 2026
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services $ - $ - $ - $ -
Commodities 35,810 5,115 - 6,750
Contractual Services - - - -
Capital Outlay - - - -
Other Charges - - - -
Total $ 35,810 $ 5,115 $ - $ 6,750
Percent Change (-85.7%) (-100.0%) 100.0%
Expenditures by Classification
o Personnel Services
o Commodities
*Contractual Services
* Capital Outlay
■Other Charges
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Works Fund # 411
Activity: Capital Improvement (PIR) Activity # 48500
Activity Scope
This fund was originally established to temporarily finance pavement management projects being partially financed
by special assessments or for high cost improvements for which bonds have not been issued. In 2006, the
Municipal Land and Buildings Fund, Non -Assessable Road Improvement Fund, and Capital Improvements Fund
were consolidated into the PIR Fund.
Objectives
1. To maintain the City's streets and roadways.
2. To maintain City infrastructure.
Issues
Finding adequate funding resources for the various projects.
Budget Commentary
The 2026 projects are listed in the proposed five-year capital improvement plan.
2023 2024 2025 2026
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services $ - $ - $ - $ -
Commodities - - - -
Contractual Services 464,825 214,470 - -
CapitalOutlay 344,267 3,916,272 1,162,225 3,096,725
Other Charges - - - -
Total $ 809,092 $ 4,130,741 $ 1,162,225 $ 3,096,725
Percent Change 410.5% (-71.9%) 166.4%
Expenditures by Classification
0%
o Personnel Services
o Commodities
13Contractual Services
o Capital Outlay
■Other Charges
100%
KY:
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Safety Fund # 412
Activity: Public Safety Capital Equipment Activity # 48120
Activity Scope
This Capital Fund was created in 1995 with the intent of building a reserve to fund General Fund public safety
capital equipment requirements. This use of the fund would level future levy spikes caused by acquisition of costly
specialized fire capital requirements. Arden Hills pays for a portion (24.9%) of Lake Johanna Fire Department
equipment according to a formula which has been updated for 2023, with the balance funded by the other member
cities of Shoreview and North Oaks.
Objectives
Provide adequate equipment to insure public safety for the residents of Arden Hills.
1. Budget constraints.
2. Arden Hills is only one member on each of the joint powers boards. Decisions are not always made on what
Arden Hills sees as important, but rather the group as a whole.
3. Due to the current economy, revenues may be impacted.
Budget Commentary
Expenditures have decreased by 25.4% based on the data provided by LJFD and anticipated debt service
payments for the new LJFD station. Property tax levy and franchise fee taxes are the main revenue sources for
this fund.
2023 2024 2025 2026
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services $ - $ - $ - $ -
Commodities - - - -
Contractual Services - - - -
Capital Outlay 168,558 478,515 535,412 399,674
Other Charges - - - -
Total $ 168,558 $ 478,515 $ 535,412 $ 399,674
Percent Change 183.9% 11.9% (-25.4%
Expenditures by Classification
E3 Personnel Services
o Commodities
13Contractual Services
0 Capital Outlay
■Other Charges
100%
33
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Economic Development Fund # 413
Activity: TCAAP Capital Activity # 41600
Activity Scope
This fund was established to account for revenue and expenditure activity related to the City comprehensive re-
use planning at the Twin Cities Army Ammunition Plant (TCAAP) site as it relates to infrastructure and re -use.
Objectives
1. Coordination of the TCAAP redevelopment planning activities while continuing to meet the needs of the City of
Arden Hills.
2. Work with Ramsey County through the Joint Development Authority (JDA).
Issues
1. Economic conditions.
2. Coordinating with multiple entities/players.
Budget Commentary
Since the City's private development partner pulled out of the project in April of 2009, Ramsey County purchased
the property and established a Joint Development Authority (JDA) with the City. Revenues and expenditures are
for City costs and future costs are not known at this time.
A budget amendment was done in 2014 to reclassify the City's costs for infrastructure development under the JDA
into the TCAAP Capital Fund. An interfund loan was made in 2013 from the PIR to be paid back as the property
develops.
2023 2024 2025 2026
BudgetSummary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services $ - $ - $ $ -
Commodities - - -
Contractual Services - - -
Capital Outlay - - -
Other Charges - - -
Total $ - $ - $ - $ -
Percent Change 0.0% 0.0% 0.0%
Expenditures by Classification
0%
o Personnel Services
o Commodities
13Contractual Services
o Capital Outlay
■ Other Charges
34
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Works Fund # 601
Activity: Water Activity # 49440
Activity Scope
The Water Utility Fund is a self-sustaining fund, or enterprise fund of the City. The City maintains its own water
distribution system. Water is purchased from the City of Roseville, who in turn, purchases water on a wholesale
basis from St. Paul Regional Water Services. Metering devices are also maintained to account for usage.
Objectives
1. Provide a safe and reliable water system for the users.
2. Maintain the water utility infrastructure including pipes, valves, hydrants and towers.
Issues
1. Staff time demands on many projects.
2. Aging water system.
3. Increased State and Federal regulations.
Budget Commentary
The 2026 operating budget is an increase of 2.7% from the previous year's adopted budget with an overall
increase of 8.3% with capital outlay and debt service. Capital expenditures include water meter replacements,
water system model update, Lake Johanna Blvd watermain assessment, Trunk watermain condition assessment,
and water tower maintenance. An operating transfer of ($100,000) to the Equipment, Building, and Replacement
Fund has also been budgeted.
2023
Budget Summary
ACTUAL
Personnel Services
$ 400,475
Commodities
42,434
Contractual Services
2,189,848
Capital Outlay
8,146
Other Charges
149,800
Total $ 2,790,704
Percent Change
2024
ArTI IAI
$ 415,111
56,729
2,058,176
168
141,633
$ 2,671,818
(-4.3%)
2025
RI inr-'FT
$ 458,640
51,500
2,511,605
855,000
346,750
$ 4,223,495
58.1 %
Full -Time Equivalent positions 3.26 3.28 3.12
Expenditures by Classification
2026
RI In(,FT
$ 479,564
57,000
2,565,646
1,124,750
348,150
$ 4,575,110
8.3%
4 17
00
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Works Fund # 602
Activity: Sanitary Sewer Activity # 49490
Activity Scope
The Sanitary Sewer Utility Fund is a self-sustaining fund, or enterprise fund of the City. The maintenance of the
sanitary sewer lines and lift stations are the responsibility of the Public Works Department. The maintenance
program involves inspections, flushing and cleaning of sewer lines and routine maintenance of the lift stations.
Wastewater flows into the Metropolitan Council's system to be treated.
Objectives
1. Work to eliminate inflow and infiltration from the sanitary sewer system.
2. Maintain the sanitary sewer so as to provide dependable service for the users.
Issues
1. Ground water inflow and infiltration problems.
2. Aging system.
Budget Commentary
The 2026 operating budget is an increase of 5.1 % from the previous year's adopted budget with an overall
decrease of -45.6% with capital outlay and debt service. The increase in Contractual Services is primarily due to
the increase of 5.9% or $59,125 for MetCouncil's wastewater charge to the City. Capital outlay costs for 2026 are
related to lift station rehabilitation. An operating transfer of ($126,000) to the Equipment, Building, and Replacement
Fund has also been budgeted.
Budaet Summa
Personnel Services
Commodities
Contractual Services
Capital Outlay
Other Charges
Total
Percent Change
Full -Time Equivalent positions
Expenditures by Classification
2023
2024
2025
2026
ACTUAL
ACTUAL
BUDGET
BUDGET
$ 472,190
$ 489,158
$ 545,270
$ 569,815
24,081
19,877
18,000
21,500
1,356,976
1,425,468
1,542,762
1,621,370
5,910
43,098
1,385,000
(390,000)
133,750
132,550
166,750
165,350
$ 1,992,906
$ 2,110,151
$ 3,657,782
$ 1,988,035
5.9%
73.3%
(45.6%)
-14% 8% 21 %
o Personnel Services
1
0 Commodities
O Contractual Services
o Capital Outlay
■ Other Charges
58%
011-
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: General Government Fund # 603
Activity: Recycling Activity # 49520
Activity Scope
The City contracts with a private company to pick up recycling for residents within the City. The City of Arden Hills
participates in a Joint Powers Agreement with Ramsey County to assist with funding the residential curbside
recycling program. The County Department of Property Taxation directly places a city recycling fee on residents'
property tax statements. Ramsey County then collects the fees and distributes them to the City with the July and
December tax settlements. Charges for recycling costs to residents include all costs associated with recycling
including clean up days.
Objectives
Provide efficient and cost effective recycling for the residents of Arden Hills.
Issues
Budget constraints.
Budget Commentary
The 2026 budget is an increase of 36.0% from the previous year's budget. 2026 is the first full year under the
City's new recycling vendor, Walters.
Budaet Summa
Personnel Services
Commodities
Contractual Services
Capital Outlay
Other Charges
Total
Percent Change
Full -Time Equivalent positions
Expenditures by Classification
2023 2024 2025 2026
A ^ I A I A ^ I A I Ill I Pl / Ill I Pl /
$ 31,739 $ 34,349 $ 39,860 $ 37,010
122,779 134,609 194,275 288,670
- - 20,000 20,000
w w w w
9.3% 50.4% 36.0%
11%
6%
o Personnel Services
o Commodities
oContractual Services
o Capital Outlay
■Other Charges
83%
37
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Works Fund # 604
Activity: Surface Water Management Activity # 49550
Activity Scope
The Surface Water Management Utility Fund is a self-sustaining fund, or enterprise fund of the City. The function
of the Surface Water Management (SWM) utility is the collection, treatment and disposition of storm water as well
as the maintenance of the storm sewers. The current fee structure is based upon zoning classification and parcel
acreage. Collection of these fees is done through the utility billing process.
Objectives
1. Maintain the storm water system including pipes and ponds in an appropriate manner.
2. Continue to make environmental improvements to the surface water system whenever cost-effectively possible.
Issues
1. Budget constraints.
2. Increased State and Federal regulations.
Budget Commentary
The 2026 operating budget is an increase of 13.6% from the previous year's budget with an overall increase of
73.5% with capital outlay. Capital outlay includes cost share of $500,000 from the 2026 PMP project. An
operating transfer of ($74,000) to the Equipment, Building, and Replacement Fund has also been budgeted.
Budaet Summa
Personnel Services
Commodities
Contractual Services
Capital Outlay
Other Charges
Total
Percent Change
Full -Time Equivalent positions
Expenditures by Classification
2023
2024
2025
2026
ACTUAL
ACTUAL
BUDGET
BUDGET
$ 342,441
$ 336,957
$ 369,190
$ 388,940
12,336
6,094
14,750
25,250
318,001
335,290
360,584
431,853
780
-
-
500,000
74,000
74,000
74,000
74,000
$ 747,558
$ 752,341
$ 818,524
$ 1,420,043
0.6%
8.8%
73.5%
5% 27%
35% o Personnel Services
o Commodities
❑Contractual Services
O Capital Outlay
2%
- ■ Other Charges
31%
01
CITY OF ARDEN HILLS, MINNESOTA
Function: General Government
Activity: Risk Management
2026 BUDGET
Fund # 725
Activity # 49800
Activity Scope
This Fund was established to pool dividends received from the League of Minnesota Cities for positive claims
experience. This fund tracks dividend revenues and deductible costs for claims. The goal of this fund is to build a
fund balance that would allow the City to increase deductible limits in order to reduce premium costs. Dividends
received from the health insurance Co-op are also deposited in this fund to use for employee wellness activities
and to supplement the City's contribution to health/dental insurance.
Objectives
1. Cover deductible costs on claims.
2. Establish employee Wellness programs to minimize health insurance costs.
Issues
Maintain the proper level of insurance coverage and deductibles to assure the best possible coverage at the
lowest possible cost.
Budget Commentary
Discontinued the entry for employee benefits to this fund as it had no effect on the financial statements. Will
continue to accumulate funds to cover potential future insurance claims. The 2026 budget has no change from
2025.
2023 2024 2025 2026
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services $ - $ - $ - $ -
Commodities - - - -
Contractual Services 189,857 173,559 219,500 219,500
Capital Outlay - - - -
Other Charges - - - -
Total $ 189,857 $ 173,559 $ 219,500 $ 219,500
Percent Change (-8.6%) 26.5% 0.0%
Expenditures by Classification
*Personnel Services
* Commodities
*Contractual Services
* Capital Outlay
■ Other Charges
100%
K
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: Public Works Fund # 726
Activity: Engineering Activity # 49600
Activity Scope
The Engineering Fund is a self-sustaining fund, or internal service fund of the City. Staff engineers perform work on
various City projects, review development plans and represent the City at various meetings on projects which are
County or State led. Records are kept of time and the costs are charged out to various projects, escrow accounts
or City departments.
Objectives
1. Provide Engineering services to the City.
2. Look out for the City's best interests in projects involving multiple jurisdictions.
3. Provide review of new developments and projects.
Issues
Provide cost effective services versus using an independent contractor.
Budget Commentary
This was a new fund in 2012. Previously, City Engineer services were provided by the City of Roseville. The costs
are charged back to the other funds based on usage per fund, as was previously done when contracting with
Roseville.
2023 2024 2025 2026
Budget Summary ACTUAL ACTUAL BUDGET BUDGET
Personnel Services $ - $ - $ - $ -
Commodities - - - -
Contractual Services 3,927 2,866 36,170 46,000
Depreciation - - - -
Other Charges - - - -
Total $ 3,927 $ 2,866 $ 36,170 $ 46,000
Percent Change (-27.0%) 1162.2% 27.2%
Expenditures by Classification
o Personnel Services
o Commodities
13Contractual Services
o Depreciation
■Other Charges
100%
All
CITY OF ARDEN HILLS, MINNESOTA
Function: Public Works
Activity: Central Garage
2026 BUDGET
Fund # 727
Activity # 49700
Activity Scope
The Central Garage and Equipment Fund is a self-sustaining fund, or internal service fund of the City. The Public
Works Department works on Streets, Parks, Water, Sanitary Sewer, and Surface Water Management. All costs
are compiled in this fund and charged out to the departments based on usage.
Objectives
1. Maintain cost effective control of multi -purpose department.
2. Manage costs involving multiple departments.
Issues
1. Aging equipment.
2. Balance the Public Works Department needs with available funds.
3. Managing an effective cost allocation structure.
Budget Commentary
This was a new fund in 2013. Previously, these services were split into all five public works departments: Streets,
Parks, Water, Sanitary Sewer, and Surface Water Management. Setting up one fund to manage these costs is
more effective and will save administrative time. The total impact is the same as budgeting these costs across
each individual department.
Budaet Summary
Personnel Services
Commodities
Contractual Services
Capital Outlay
Other Charges
Total
Percent Change
Expenditures by Classification
42%
2023 2024 2025 2026
118,441 103,058 124,250 122,500
69,870 69,163 87,960 90,250
(-8.5%) 23.2% 0.3%
58%
13Personnel Services
o Commodities
oContractual Services
o Capital Outlay
■ Other Charges
to
CITY OF ARDEN HILLS, MINNESOTA 2026 BUDGET
Function: General Government Fund # 728
Activity: Technology Activity # 49900
Activity Scope
The Technology Fund is a self-sustaining fund, or internal service fund of the City. All departments use
technology. All costs are compiled in this fund and charged out to the departments based on usage.
Objectives
1. Maintain cost effective control of multi -purpose department.
2. Manage costs involving multiple departments.
Issues
1. Aging equipment.
2. Balance department needs with available funds
3. Managing an effective cost allocation structure.
Budget Commentary
This was a new fund in 2013. Previously, these services were split into all departments. Setting up one fund to
manage these costs is more effective and will save administrative time. The total impact is the same as budgeting
these costs across each individual department.
Budaet Summary
Personnel Services
Commodities
Contractual Services
Capital Outlay
Other Charges
Total
Percent Change
Full -Time Equivalent positions
Expenditures by Classification
99%
2023 2024 2025 2026
5 185 2,400 2,400
181,578 177,887 206,370 215,920
(-1.9%) 17.2% 4.6%
0.05 -
*Personnel Services
* Commodities
*Contractual Services
* Capital Outlay
■ Other Charges
Cf:
Attachment B
CITY OF ARDEN HILLS
2026 - 2030 PROPOSED CIP
Department Summary
Project Details
Funding Source Summary
Sources and Uses of Fund
Street Projects - 10 year plan
Page
1
6
81
87
95
2026 through 2030
Capital Improvement Plan
Arden Hllls, MN
Department Summary
Department
2026 2027 2028
2029
2030
Total
Water Department
4,924,750 1,475,000 7,520,000
13,919,750
Street Department
3,300,000 6,345,000
5,770,000
15,415,000
Parks Department
996,725 5,949,225 305,225
2,650,225
240,000
10,141,400
Equipment
410,000 1,207,120 531,120
430,905
431,000
3,010,145
Public Safety
399,674 567,163 471,466
319,971
384,474
2,142,748
Sanitary Sewer Department 190,000 720,000 683,000 24,000 1,617,000
Economic Development 180,000 130,000 310,000
Government Buildings 140,855
59,781
520,822
721,458
GRAND TOTAL 10,401,149 10,189,363 15,172,811
4143,882
7,370,296
47,277,501
2026 through 2030
Capital Improvement Plan
Arden Hllls, MN
Projects By Department
Department Project # Priority 2026 2027 2028 2029 2030 Total
Economic Development
Gateway Signs 25-EDA-001 180,000 130,000 310,000
Economic Development Total 180,000 130,000 0 0 0 310,000
Equipment
Replace 2009 Sterling Acterra Truck 27-EgpV-001 3 144,500 159,135 303,635
#431
Replace 2018 Toro Large Area
26-Eqp-001 3 114,000
Mower #457
Replace 2016 F-350 wN-Plow and 26-EgpV-001 3 85,000
Liftgate #215
Turf Fertilizer and Herbicide
26-Eqp-003 3 25,000
Sprayer
114,000
85,000
25,000
Replace 1996 Redi-Haul Trailer #108
26-Eqp-002
3
18,000
18,000
Pipeline Inspection Push Camera
26-Eqp-004
3
12,000
12,000
System
Auto Greaser Installation for asset
26-Eqp-005
3
11,500
11,500
85135
Replace 1993 Case 621 Loader #103
25-Eqp-001
300,000
300,000
Replace 2000 Backhoe #204
27-Eqp-002
3
172,010
172,010
Replace 2017 Mack
Plow/Wing/Dump Truck #123
28-EgpV-001
5
154,500 207,700
362,200
Emergency Generator Replacement
27-Eqp-004
2
150,000 154,500 159,135
463,635
Schedule
Replace 2015 Ford F-450
Plow/Dump Truck #320
27-EgpV-003
2
145,000
145,000
Replace 2016 F-350 Pickup
27-EgpV-002
4
84,975
84,975
w/Liftgate #455
Replace 2013 Ford Escape #504
26-EgpV-003
41,500
41,500
Replace 2016 Stepp Asphalt Patch
Trailer#121
28-Egp-004 3
77,250
77,250
Replace 2019 Ford F-150 Ext Cab
28-EgpV-002 3
46,350
46,350
#601
Replace 1998 Tow Behind Air
28-Eqp-003 3
36,050
36,050
Compressor#107
Replace Bobcat Snowblower 84"
28-Eqp-001 3
9,270
9,270
#118
Replace 2019 Ford F350 Crew Cab
29-EgpV-002
4
77,250
77,250
w/Tommygate #85323
Replace 2023 Bobcat Toolcat
#85478
29-Eqp-004
2
77,100
77,100
Replace 2019 Ford F-150 #602
29-EgpV-001
3
46,350
46,350
Replace 2012 Workman #445
29-Eqp-003
3
36,050
36,050
Replace 2019 Bobcat Miller/Planer
29-Eqp-002
3
16,480
16,480
#129
Replace 2009 Husqavarna
28-Eqp-002
3
10,300
10,300
Pavement Saw #113
Replace Snowblower 72" #468
29-Eqp-001
4
8,240
8,240
Replace 2022 Ford F-250 w/Service
Body
30-EgpV-004
3
82,400 82,400
Replace 2022 Ford F-350 w/Plow &
Department Project # Priority 2026 2027 2028 2029 2030 Total
Replace 2020 Ford F-150 #603
30-EgpV-002
3
46,350
46,350
Replace 2 Toro Zero Turn Mowers
30-Eqp-005
3
42,000
42,000
Asset 85485, 85486
Replace 2018 Ford Escape #505
30-EgpV-001
41,200
41,200
Replace 2016 Workman #456
30-Eqp-002
3
36,050
36,050
Replace Bobcat Rotary Brushcutter
30-Eqp-003
2
15,450
15,450
#440
Replace Hotsy Pressure Washer
30-Eqp-001
4
5,150
5,150
#470
Equipment Total
410,000
1,207,120
531,120
430,905
431,000
3,010,145
Government Buildings
City Hall Elevator
27-BLDG-001
4
103,507
103,507
City Hall Furnishings
27-BLDG-002
4
21,342
21,342
City Hall Security System
27-BLDG-003
4
16,006
16,006
Air Handler/HVAC Maintenance
29-BLDG-001
5
59,781
59,781
City Hall Roof
30-BLDG-001
3
410,278
410,278
City Hall Entrance Canopy &
30-BLDG-002
4
102,604
702,604
Masonry Replacements
Concrete Flatwork, Partial
30-BLDG-003
5
7,940
7,940
Government Buildings Total
0
140,855
0
59,781
520,822
721,458
Parks Department
Snelling Ave N. & Royal Hills Trail
26-Park-009
2 450,000
450,000
Improvements
Hard Court & Trail Rehabilitation
26-Park-005
3 200,000
155,000
265,000
620,000
Hamline Avenue N Trail Connection
26-Park-001
3 160,000
160,000
Improvement
Lake Johanna Blvd Trail
28-Park-001
3 100,000
100,000
1,800,000
2,000,000
Arden Oaks Park ADA
26-Park-002
3 67,500
67,500
Improvements
Parks Master Plan
25-Park-007
2 10,000
10,000
10,000
10,000
10,000
50,000
GRG Floral Park NRMB
26-Park-006
5,225
5,225
5,225
5,225
20,900
GRG Hazelnut & Chatham NRMB
26-Park-007
4,000
4,000
8,000
Old Hwy 10 Trail - 96 to Valentine
27-park-003
4,635,000
4,635,000
Park
Perry Park Improvements
27-Park-002
4
520,000
25,000
545,000
Playground Structure Replacement
27-Park-001
3
520,000
275,000
795,000
County Road E Trail Improvements
26-Park-003
3
375,000
375,000
Park Shelter Replacements
26-Park-008
4
185,000
185,000
Hockey Rink Board Rehabilitation
30-Park-001
4
230,000
230,000
Parks Department Total
996,725
5,949,225
305,225
2,650,225
240,000
10,141,400
Public Safety
LJFD General Equipment
26-Pub-003
203,254
56,631
16,415
53,171
7,570
337,041
LJFD Engine/Ladder Replacement
27-Pub-001
145,180
150,060
295,240
LJFD Rescue/Command/Utility
27-Pub-002
51,240
29,280
112,801
107,604
300,925
Vehicle Replacement
LJFD Station Capital
26-Pub-004
0
65,392
73,200
0
0
138,592
Lake Johanna Fire Dept Fire Station
27-Pub-005
265,800
269,050
266,800
269,300
1,070,950
Public Safety Total
399,674
567,163
471,466
319,971
384,474
2,142,748
Department Project # Priority 2026 2027 2028 2029 2030 Total
Sanitary Sewer Department
Lift Station Rehabilitation
26-Sew-002
2 190,000
60,000
223,000
24,000
497,000
Sewer Lining/Rehabilitation
26-Sew-001
2
660,000
460,000
1,120,000
Sanitary Sewer Department Total
190,000
720,000
0
683,000
24,000
1,617,000
Street Department
2026 PMP
26-Str-001
2 3,300,000
3,300,000
2028 PMP
28-Str-001
2
6,345,000
6,345,000
2030 PMP
30-Str-001
2
5,770,000
5,770,000
Street Department Total
3,300,000
0
6,345,000
0
5,770,000
15,415,000
Water Department
TCAAP New Booster Station
26-W-001
2 1,500,000
1,500,000
TCAAP Trunk Water Improvements
21-W-005
3 1,500,000
1,500,000
(Spine Road)
Trunk Water Main Improvements -
26-W-005
1 800,000
800,000
Roseville
Water Meter Replacement
26-W-006
3 530,000
900,000
1,430,000
TCAAP Water Tower
28-W-001
3 500,000
7,000,000
7,500,000
Water System Model Update
26-W-007
3 42,750
42,750
Lake Johanna Blvd Watermain
26-W-002
3 20,000
500,000
520,000
Assessment
Trunk Water Main Condition
26-W-003
2 20,000
20,000
40,000
Assessment
Water Tower Maintenance
26-W-004
2 12,000
375,000
387,000
Booster Station Improvements
27-W-001
2
200,000
200,000
Water Department Total
4,924,750
1,475,000
7,520,000
0
0
13,919,750
GRAND TOTAL
10,401,149
10,189,363
15,172,811
4,143,882
7,370,296
47,277,501
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Str-001
Project Name 2026 PMP
Total Project $3,300,000 Department Street Department
Cost
Type Improvement Category Streets: Reconstruction
Priority 2 Very Important Status Active
Useful Life 20 years TCAAP No
Description
Pavement Management Program (PMP) improvements consisting of spot curb repair, resurfacing or full depth reclamation and new bituminous pavement, trail rehabilitation
repairs to storm sewer inlets, repairs to sanitary sewer manholes and castings, hydrant and valve repairs, watermain replacement and relocation. Street segments include:
Karth Lake Dr (Pleasant or to Cul-de-Sac), Pleasant Drive (Amble to Karth Lake Dr), Pleasant Circle, Amble Drive (Karth Lake or to Lexington Avenue), Karth Lake Circle,
and Cummings Park Drive. Retaining wall rehab, BMP-Phase 2, outfall sediment removal and grit chamber additions.
Justification
Pavement conditions are showing distress with condition ratings from 33 to 62, pavement conditions will continue to decline. Proposed improvements are necessary to
continue safe and reliable street and utility services. These improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement
within the City.
Expenditures 2026 2027 2028 2029 2030 Total
Construction/Maintenance
3,300,000
0
0
0
0
3,300,000
Funding Sources
Total 3,300,000
2026
0
2027
0
2028
0
2029
0
2030
3,300,000
Total
Capital Improvement Funds (PIR)
1,170,000
0
0
0
0
1,170,000
Other
930,000
0
0
0
0
930,000
Water Utility Funds
500,000
0
0
0
0
500,000
Surface Water Mgmt Utility Funds
500,000
0
0
0
0
500,000
Sanitary Sewer Utility Fund
200,000
0
0
0
0
200,000
Total 3,300,000
0
0
0
0
39300,000
6
Produced Using Plan -It CIP Software Page 1 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 28-Str-001
Project Name 2028 PMP
Total Project $6,345,000 Department Street Department
Cost
Type Improvement Category Streets: Reconstruction
Priority 2 Very Important Status Active
Useful Life 20 years TCAAP No
Description
Pavement Management Program (PMP) improvements consisting of spot curb repair, resurfacing as mill & overlay or full depth reclamation with new bituminous pavement,
repairs to storm sewer inlets, dredging Fernwood, Hunters and Benton ponds and adding grit chambers, repairs to sanitary sewer manholes and castings, CIPP lining of
existing clay pipe, watermain replacement within Benton Way neighborhood that affects the streets, hydrant and valve repairs.
Street segments include: Benton Way, Tiller Lane (Lexington to Cannon Ave), Cannon Ave (Tiller Ln to Dunlap), Dunlap (Cannon Ave to Tiller Lane), Pine Tree Dr, Harriet
Ave, Walden PI, Lametti Ln, Lametti Ct, Bussard Ct, Hunters Ct, Fernwood St, Dellwood Ave and Carlton Dr.
Justification
Pavement conditions are showing distress with condition ratings from 15 to 59. Pavement conditions will continue to decline. Proposed improvements are necessary to
continue safe and reliable street and utility services. These improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement
within the City, extensive large area patching was performed in 2022 by Public Works. Watermain within Benton Way neighborhood consists of 58-year old cast iron pipe and
has experienced several breaks in recent years, the goal will be to replace the segments that could impact the new road surface. Pond dredging is overdue in several ponds
within the project corridor, City staff has received feedback from residents to perform maintenance. CIPP lining of the existing clay sanitary sewer pipe will prevent inflow and
infiltration and root intrusion as well as extending the life of the pipe for 50+ years.
Expenditures
2026
2027
2028
2029
2030
Total
Construction/Maintenance
0
0
6,345,000
0
0
6,345,000
Total 0
0
6,345,000
0
0
6,345,000
Funding Sources
2026
2027
2028
2029
2030
Total
Other
0
0
2,075,000
0
0
2,075,000
Surface Water Mgmt Utility Funds
0
0
1,410,000
0
0
19410,000
Capital Improvement Funds (PIR) 0 0 1,280,000 0 0 1,280,000
Sanitary Sewer Utility Fund 0 0 620,000 0 0 620,000
State Aid 0 0 480,000 0 0 480,000
Water Utility Funds
0 0 480,000 0 0 480,000
Total 0 0 6,345,000 0 0 6,345,000
7
Produced Using Plan -It CIP Software Page 2 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 30-Str-001
Project Name 2030 PMP
Total Project $5,770,000 Department Street Department
Cost
Type Improvement Category Streets: Reconstruction
Priority 2 Very Important Status Active
Useful Life 20 years TCAAP No
Description
Proposed improvements to Lake Valentine Rd. (Old Hwy 10 to MVHS), Northwoods or (Red Fox to cul-de-sac), Red Fox Rd (Lexington to cul-de-sac), Grey Fox (Lexington to
Highway 51), Dunlap Street N, Connelly Ave, and Hamline Ave N (County Rd E to dead end) . Elmer Anderson Trail Rehabilitation. Improvements include spot repair to
existing curb, repairs to storm sewer catch basins, hydrant repairs, sanitary sewer manhole and casting repairs and CIPP lining at Red Fox Road. Pavement is proposed to be
milled or full depth reclamation with new bituminous pavement. Replace existing watermain along Grey Fox Road. Construct a 12-inch watermain loop from Grey Fox Rd to
Red Fox Rd. Replace water services on Dunlap St.
Justification
Existing street pavement conditions are declining with ratings from 25 to 44. Proposed improvements are necessary to continue safe and reliable street and utility services.
These improvements will address the increasing costs for patching and maintaining highly deteriorated street pavement within the City, extensive large area patching was
conducted in 2024.
Expenditures
2026
2027
2028
2029
2030
Total
Construction/Maintenance
0
0
0
0
5,770,000
5,770,000
Funding Sources
Total 0
2026
0
2027
0
2028
0
2029
5,770,000
2030
5,770,000
Total
Other
0
0
0
0
2,300,000
2,300,000
Capital Improvement Funds (PIR)
0
0
0
0
1,230,000
1,230,000
Water Utility Funds
0
0
0
0
1,025,000
1,025,000
State Aid
0
0
0
0
880,000
880,000
Sanitary Sewer Utility Fund
0
0
0
0
175,000
175,000
Surface Water Mgmt Utility Funds
0
0
0
0
160,000
160,000
Total 0
0
0
0
5,770,000
5,770,000
8
Produced Using Plan -It CIP Software Page 3 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 29-BLDG-001
Project Name Air Handler/HVAC Maintenance
Total Project
$59,781
Contact
Building Official
Cost
Department
Government Buildings
Type
Maintenance
Category
Building Repair & Maint
Priority
5 Future Consideration
Status
Active
Useful Life
50 years
Description
This will cover ongoning preventitive maintenance and replacement parts for the existing air handlers to keep them operational.
Justification
Consistent maintenance of the air handlers and HVAC system will ensure the longest possible usefule lifespan before replacement is required.
Refer to Reserve Advisors Study, Pages 4.20-4.21.
Expenditures 2026 2027 2028 2029
Construction/Maintenance 0 0 0 59,781
Total 0 0 0 59,781
2030
Total
0
59,781
0
59,781
Funding Sources
2026 2027 2028 2029
2030
Total
Equipment/Building Replacement Fund
9,781
0
59,781
Total 0 0 0 59,781
0
59,781
9
Produced Using Plan -It CIP Software Page 4 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Park-002
Project Name Arden Oaks Park ADA Improvements
Total Project
$67,500
Cost
Department
Parks Department
Category
Park Capital Improvements
Status
Active
Contact
Park & Recreation Mgr
Type
Improvement
Priority
3Important
Useful Life
25 years
Description
In 2025 as part of the Arden Oaks Park improvements, the bid alternative for ADA improvements was removed from the scope of work due to budget constraints.
The ADA Improvements include concrete pedestrian ramp access from Arden Oaks Drive, bituminous trail improvements, ADA portable toilet pad with enclosure.
Justification
ADA improvements are necessary to provide accessibility to the park amenities. Currently, there is no ADA access.
Expenditures 2026 2027 2028 2029 2030 Total
Construction/Maintenance 67,500 0 0 0 0 67,500
Total 67,500 0 0 0 0 67,500
Funding Sources
2026
2027
2028
2029
2030
Total
Capital Improvement Funds (PIR)
67,500
0
0
0
0
67,500
Total 67,500
0
0
0
0
67,500
10
Produced Using Plan -It CIP Software Page 5 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Eqp-005
Project Name Auto Greaser Installation for asset 85135
Total Project
$11,500
Contact
Public Works Director
Cost
Department
Equipment
Type
Equipment
Category
Equipment: Public Works
Priority
3 Important
Status
Active
Useful Life
12 years
Description
Parts and labor to outfit asset 85135 plow truck with an auto greaser system. This system minimizes maintenance and provides longevity to the truck chassis and plow
equipment moving parts.
Justification
The single axles plow truck is used in harsh conditions, namely road salt. The greasing system provides expanded dependability and extended life on moving chassis and
plow parts. This truck is used for emergency operations.
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 11,500 0 0 0 0 11,500
Total 11,500 0 0 0 0 11,500
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
11,500
0
0
0
0
11,500
Total 11,500
0
0
0
0
11,500
11
Produced Using Plan -It CIP Software Page 6 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 27-W-001
Project Name Booster Station Improvements
Total Project $200,000
Department
Water Department
Cost
Type Unassigned
Category
Utility Maintenance
Priority 2 Very Important
Status
Active
Useful Life 20 years
TCAAP
No
Description
Booster Station motor pump rehab, minor electrical components, building and site improvements - $200,000
Justification
The booster station is a critical component of the water distribution system to supply water to the northern portion of the City. Proactive rehabilitation will better manage risks
associated with water supply disruptions.
Expenditures
2026 2027
2028 2029 2030 Total
Construction/Maintenance 0 200,000 0 0 0 200,000
Total 0
200,000
0
0
0
200,000
Funding Sources 2026
2027
2028
2029
2030
Total
Water Utility Funds 0
200,000
0
0
0
200,000
Total 0
200,000
0
0
0
200,000
12
Produced Using Plan -It CIP Software Page 7 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
27-BLDG-001
Project Name
City Hall Elevator
Total Project
$103,507
Contact
Building Official
Cost
Department
Government Buildings
Type
Improvement
Category
Building Repair & Maint
Priority
4 Less Important
Status
Active
Useful Life
20 years
Description
Upgrades to the City Hall elevator system.
Justification
The elevator currently in use at City Hall is original to the building. Most elevator components have an estimated lifespan of 25 years, at this point the original components
have usually become obsolete.
Refer to pages 4.13 and 4.25-4.26 of the full reserve study.
Expenditures
2026
2027
2028
2029
2030
Total
Equip/Vehicles/Furnishings
0
103,507
0
0
0
103,507
Total 0
103,507
0
0
0
103,507
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
103,507
0
0
0
103,507
Total 0
103,507
0
0
0
103,507
13
Produced Using Plan -It CIP Software Page 8 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
30-BLDG-002
Project Name
City Hall Entrance Canopy & Masonry Replacements
Total Project
$102,604 Contact
Building Official
Cost
Department
Government Buildings Type
Maintenance
Category
Building Repair & Maint Priority
4 Less Important
Status
Active Useful Life
20 years
Description
Replacement of deteriorating masonry and grout work as well as painting of corroded steel components.
Justification
Lintels and other structural steel components are starting to corrode, and the brick facade is showing evidence of weeping.
Further explanation is provided in the Reserve Advisors Full Reserve Study, Pages 4.2-4.7.
Expenditures 2026 2027 2028 2029
Equip/Vehicles/Furnishings 0 0 0 0
Total 0 0 0 0
2030
Total
102,604
102,604
102,604
102,604
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
0
0
0
102,604
102,604
Total 0
0
0
0
102,604
102,604
14
Produced Using Plan -It CIP Software Page 9 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
27-BLDG-002
Project Name
City Hall Furnishings
Total Project
$46,445
Contact
Building Official
Cost
Department
Government Buildings
Type
Equipment
Category
Building Repair & Maint
Priority
4 Less Important
Status
Active
Useful Life
20 years
Description
Update City Hall furnishings and equipment which vary in age.
Justification
Useful life of different elements greatly vary, but it is recommended to budget for replacements, Reference Reserve Advisors Study, pages 4.15 - 4.17.
Expenditures
2026
2027
2028
2029
2030
Total
Future
Equip/Vehicles/Furnishings
0
21,342
0
0
0
21,342
25,103
Total 0
21,342
0
0
0
21,342
Funding Sources
2026
2027
2028
2029
2030
Total
Future
Equipment/Building Replacement Fund
1,342
0
0
0
21,342
25,103
Total 0
21,342
0
0
0
21,342
15
Produced Using Plan -It CIP Software Page 10 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
30-BLDG-001
Project Name
City Hall Roof
Total Project
$580,278
Contact
Building Official
Cost
Department
Government Buildings
Type
Maintenance
Category
Building Repair & Maint
Priority
3 Important
Status
Active
Useful Life
25 years
TCAAP
No
Description
Complete replacement of all buit-up roof components.
Justification
The current roof system is mostly original from the time of the buildings construction and is reaching the end of it's useful lifespan.
Prior
Expenditures
2026
2027
2028
2029
2030
Total
170,000
Construction/Maintenance
0
0
0
0
410,278
410,278
Total 0
0
0
0
410,278
410,278
Prior
Funding Sources
2026
2027
2028
2029
2030
Total
170,000
Equipment/Building Replacement Fund
0
0
0
0
410,278
410,278
Total 0
0
0
0
410,278
410,278
16
Produced Using Plan -It CIP Software Page 11 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
27-BLDG-003
Project Name
City Hall Security System
Total Project
$36,097
Contact
Building Official
Cost
Department
Government Buildings
Type
Maintenance
Category
Building Repair & Maint
Priority
4 Less Important
Status
Active
Useful Life
15 years
Description
The current security systems will be approaching the end of their useful life and should be budgeted for phased replacement.
Justification
New systems would result in a more secure building. As long as current systems are operational, the time of replacement would be at the discretion of the City.
Expenditures
2026
2027
2028
2029
2030
Total
Future
Equip/Vehicles/Furnishings
0
16,006
0
0
0
16,006
20,091
Total 0
16,006
0
0
0
16,006
Funding Sources
2026
2027
2028
2029
2030
Total
Future
Equipment/Building Replacement Fund
0
16,006
0
0
0
16,006
20,091
Total 0
16,006
0
0
0
16,006
17
Produced Using Plan -It CIP Software Page 12 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
30-BLDG-003
Project Name
Concrete Flatwork, Partial
Total Project
$17,279
Contact
Building Official
Cost
Department
Government Buildings
Type
Maintenance
Category
Building Repair & Maint
Priority
5 Future Consideration
Status
Active
Useful Life
65 years
Description
Approximately 5,400 square feet of concrete flatwork.
Justification
Estimate that up to 420 linear feet of curbs and gutters, or thirty percent (30%) of the total, will require replacement during the next 30 years, per Reserve Study, Page 4.34.
Expenditures
2026
2027
2028
2029
2030
Total
Future
Construction/Maintenance
0
0
0
0
7,940
7,940
9,339
Total 0
0
0
0
7,940
7,940
Funding Sources
2026
2027
2028
2029
2030
Total
Future
Equipment/Building Replacement Fund
0
0
0
0
7,940
7,940
9,339
Total 0
0
0
0
7,940
7,940
18
Produced Using Plan -It CIP Software Page 13 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Park-003
Project Name County Road E Trail Improvements
Total Project $375,000
Contact
Public Works Director
Cost
Department Parks Department
Type
Improvement
Category Park Capital Improvements
Priority
3 Important
Status Active
Useful Life
25 years
Description
In coordination with the Ramsey County paving project on County Rd E, Ramsey County
will be constructing a new multi -use grade -separated 10-foot wide bituminous trail
Justification
Per the County's cost -share policy, the total cost of the trail construction is split 50/50. Constructing the trail along with the County's road paving project in 2026 allows for
more efficient planning/design and lowers construction costs. This trail has been identified as a high priority connection.
Expenditures 2026 2027 2028 2029 2030 Total
Unassigned 0 0 0 375,000 0 375,000
Total 0
0
0
375,000
0
375,000
Funding Sources
2026
2027
2028
2029
2030
Total
Ramsey County 0 0 0 187,500 0 187,500
Capital Improvement Funds (PIR) 0 0 0 187,500 0 187,500
Total 0 0 0 375,000 0 375,000
19
Produced Using Plan -It CIP Software Page 14 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 27-Eqp-004
Project Name Emergency Generator Replacement Schedule
Total Project $463,635 Department Equipment
Cost
Type Equipment Category Equipment: Public Works
Priority 2 Very Important Status Active
Useful Life 20 years TCAAP No
Description
The water department, sewer department, and city hall standby power (EOC) utilizes a total of 4 standby generators ranging in model years (1999-2005). This equipment is in
need of a replacement schedule. Estimated auction return is $5,000 each.
Justification
Due to the emergency needs, factors like outdated technology, parts availability, dependability, and repair costs are taken into account with the replacement plan.
Additionally, stationary mount natural gas fueled generators are much more efficient and do not suffer from the reliability issues seen with diesel fueled units. PW plans to
replace generators on a priority basis.
Expenditures
2026
2027
2028
2029
2030
Total
EquipNehicles/Furnishings
0
150,000
154,500
159,135
0
463,635
Funding Sources
Sanitary Sewer Utility Fund
Water Utility Funds
Total 0 150,000 154,500 159,135 0 463,635
2026
2027
2028
2029
2030
Total
0
145,000
0
77,067
0
222,067
0
0
149,500
0
0
149,500
Equipment/Building Replacement Fund 0 0 0 77,068 0 77,068
Trade -In Value 0 5,000 5,000 5,000 0 15,000
Total 0 150,000 154,500 159,135 0 463,635
20
Produced Using Plan -It CIP Software Page 15 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
25-EDA-001
Project Name
Gateway Signs
Total Project
$310,000 Department Economic Development
Cost
Type
Improvement Category Economic Devi Improvement
Priority
n/a Status Active
TCAAP
No
Description
Install gateway signs at major entry points to the City. Potential locations for signs include: (1) Highway 96 at Round Lake Road, (2) Highway 96 at Lexington Avenue, (3)
Lake Valentine Road at 35W, (4) County Road E at Lexington Avenue, (5) Lexington Avenue at County Road F, (6) Lexington Avenue at County Road D, and (7) County
Road E at Highway 51. Potential sign locations are not listed in order of priority and are subject to change. There are three existing gateway signs in the following locations:
(1) County Road E2 at 1-35W, (2) County Road D at Cleveland Avenue, and (3) Lake Johanna Boulevard at the Roseville border. Staff has budgeted for the completion of an
additional gateway sign in 2027 at a location to be determined.
Justification
Advance the economic development goals in the 2040 Comprehensive Plan. Implement the Guiding Plan for the B2 District. Work to better identify the entrance points to the
City for businesses and visitors. Foster civic pride and community identity.
Expenditures 2026 2027 2028 2029 2030 Total
Construction/Maintenance 180,000 130,000 0 0 0 310,000
Total 180,000 130,000 0 0 0 310,000
Funding Sources 2026
2027
2028
2029
2030
Total
EDA General Fund 180,000
130,000
0
0
0
310,000
Total 180,000
130,000
0
0
0
310,000
Budget Impact
Annual maintenance costs for sign cleaning and care of landscaping is estimated by the Public Works Department at $500 per sign annually.
21
Produced Using Plan -It CIP Software Page 16 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Park-006
Project Name GRG Floral Park NRMB
Total Project $26,125
Department
Parks Department
Cost
Type Unassigned
Category
Unassigned
Priority n/a
Status
Active
Description
Partnership with Great River Greening for buckthorn and general
habitat management at Floral
Park.
Prior Expenditures
2026 2027
2028
2029
2030
Total
5,225 Other
5,225 5,225
5,225
5,225
0
20,900
Total
5,225 5,225
5,225
5,225
0
20,900
Prior Funding Sources
2026 2027
2028
2029
2030
Total
5,225 Capital Improvement Funds (PIR)
5,225 5,225
5,225
5,225
0
20,900
Total
5,225 5,225
5,225
5,225
0
20,900
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Park-007
Project Name GRG Hazelnut & Chatham NRMB
Total Project $12,000
Department
Parks Department
Cost
Type Unassigned
Category
Unassigned
Priority n/a
Status
Active
Description
Partnership with Great River Greening for buckthorn and general habitat
management at Hazelnut & Chatham Parks.
Prior Expenditures
2026 2027
2028
2029
2030
Total
4,000 Other
4,000 4,000
0
0
0
8,000
Total
4,000 4,000
0
0
0
8,000
Prior Funding Sources
2026 2027
2028
2029
2030
Total
4,000 Capital Improvement Funds (PIR)
4,000 4,000
0
0
0
8,000
Total
4,000 4,000
0
0
0
8,000
22
Produced Using Plan -It CIP Software Page 17 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Park-001
Project Name Hamline Avenue N Trail Connection Improvement
Total Project
$160,000
Contact
Public Works Director
Cost
Department
Parks Department
Type
Improvement
Category
Park Capital Improvements
Priority
3 Important
Status
Active
Useful Life
25 years
Description
Multi -use grade -separated 10-foot wide bituminous trail improvement approximately 500-feet in length along the East side of Hamline Avenue North from the City of Roseville
to the existing trail on Hamline Avenue North in Arden Hills.
Justification
This trail improvement has been identified as a high priority connection. Coordination with surrounding agencies provides cost effectiveness and anticipated 2026
construction.
Expenditures 2026 2027 2028 2029 2030 Total
Construction/Maintenance 160,000 0 0 0 0 160,000
Total 160,000 0 0 0 0 160,000
Funding Sources
2026
2027
2028
2029
2030
Total
Capital Improvement Funds (PIR)
80,000
0
0
0
0
80,000
Ramsey County
80,000
0
0
0
0
80,000
Total 160,000
0
0
0
0
160,000
23
Produced Using Plan -It CIP Software Page 18 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Park-005
Project Name Hard Court & Trail Rehabilitation
Total Project $771,000 Department
Parks Department
Cost
Type Improvement Category
Park Capital Improvements
Priority 3Important Status
Active
Useful Life 20 years TCAAP
No
Description
2026: Arden Manor Court - $200,000
2027: Ingerson New Trail Connections - $100,000; Sampson Basketball Court - $55,000
2028:Hazelnut Tennis Court & Trail Rehab - $265,000 (tie with 2028 PMP);
2033: Valentine Park Basketball Court - $85,500; Ingerson Basketball Court - $65,500
2044: Cummings Park Sport Court; Royal Hills Sport Court
2048: Floral Park Sport Court
2050: Arden Oaks Basketball Court; Freeway Park Basketball Court
Justification
Proposed improvements are intended to maintain existing court surfaces. Other nearby bituminous surfaces are included if applicable
such as trails or trail connections. In
general, a court surface life is approximately 25 years before cracks and pavement deformation require full reconstruction. Routine
crack filling to prolong court surfaces is
being performed.
Expenditures 2026
2027 2028 2029
2030
Total Future
Construction/Maintenance 200,000
155,000 265,000 0
0
620,000 151,000
Total 200,000
155,000 265,000 0
0
620,000
Funding Sources 2026
2027 2028 2029
2030
Total Future
Capital Improvement Funds (PIR) 200,000
155,000 265,000 0
0
620,000 151,000
Total 200,000
155,000 265,000 0
0
620,000
24
Produced Using Plan -It CIP Software Page 19 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 30-Park-001
Project Name Hockey Rink Board Rehabilitation
Total Project
$230,000
Cost
Department
Parks Department
Category
Park Maintenance
Status
Active
Contact Park & Recreation Mgr
Type Maintenance
Priority 4 Less Important
Useful Life 25 years
Description
Through inspection, Public works has determined the hockey boards and fencing at Perry Park and Freeway Park have reached the end of their service life and are in need
of replacement.
This project is budgeted only to replace the boards and fencing with no other improvements to the hockey rink.
Justification
The condition of the hockey boards are deteriorated beyond spot replacement and the fencing is dilapidated.
Expenditures
2026
2027
2028
2029
2030
Total
Construction/Maintenance
0
0
0
0
230,000
230,000
Total 0
0
0
0
230,000
230,000
Funding Sources
2026
2027
2028
2029
2030
Total
Capital Improvement Funds (PIR)
0
0
0
0
230,000
230,000
Total 0
0
0
0
230,000
230,000
25
Produced Using Plan -It CIP Software Page 20 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 28-Park-001
Project Name Lake Johanna Blvd Trail
Total Project $2,000,000 Department
Parks Department
Cost
Type Improvement Category
Park Capital Improvements
Priority 3Important Status
Active
Useful Life 20 years TCAAP
No
Description
Construction of a new 8,100-feet in length, grade separated, 10-ft wide bituminous trail along
Lake Johanna Blvd in the Northwest orientation from County Rd D to Old
Snelling Ave.
Justification
The new trail will improve safety and adequately accommodate pedestrians & bicyclists along the Lake Johanna Boulevard Corridor between Old Snelling Ave and County
Road D in Arden Hills. The proposed Lake Johanna Boulevard trail improvements will provide critical connections between Arden Hills neighborhoods, neighboring Cities,
Tony Schmidt Regional Park, Bethel College and Mounds View High School.
Expenditures 2026
2027 2028 2029 2030 Total
Construction/Maintenance 0
0 0 1,800,000 0 1,800,000
Planning/Design 100,000
100,000 0 0 0 200,000
Total 100,000
1009000 0 1,8009000 0 29000,000
Funding Sources 2026
2027 2028 2029 2030 Total
State Aid 0
0 0 1,800,000 0 1,800,000
Capital Improvement Funds (PIR) 100,000
100,000 0 0 0 200,000
Total 100,000
100,000 0 1,800,000 0 2,000,000
Budget Impact
The 8,100-feet of new trail will be the responsibility of the City to maintain. Maintenance includes,
snow/ice control (seasonally), crack sealing and fog sealing (approx. every
5 years).
26
Produced Using Plan -It CIP Software Page 21 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-W-002
Project Name Lake Johanna Blvd Watermain Assessment
Total Project
$520,000
Cost
Department
Water Department
Category
Utility Improvements
Status
Active
TCAAP
No
Contact
Public Works Director
Type
Improvement
Priority
3Important
Useful Life
50 years
Description
Condition assessment of 3.600-feet of existing 12-inch Ductile Iron Pipe (DIP) watermain along Lake Johanna Blvd. from County Rd E to Ridgewood Ct. This watermain has
experienced a few leaks/breaks in recent years.
Proposed replacement of watermain in 2028 if determined by condition assessment.
Justification
This watermain has experienced a few leaks/breaks in recent years. With the proposed trail improvements along this corridor, tentatively scheduled for construction in 2028,
it is important to evaluate the condition of the existing pipe to plan for replacment if needed. The existing watermain material is DIP was installed in 1968 and the soil
conditions are unknown but likely corrosive due to its proximity next to Lake Johanna.
The funding proposed in 2028 is considered a placeholder until the condition assessment determines a recommendation for replacement of the existing watermain.
Expenditures 2026 2027 2028 2029 2030 Total
Construction/Maintenance 0 0 500,000 0 0 500,000
Planning/Design 20,000 0 0 0 0 20,000
Total 20.000 0 500.000 0 0 520.000
Funding Sources
2026
2027
2028
2029
2030
Total
Water Utility Funds
20,000
0
500,000
0
0
520,000
Total 20,000
0
500,000
0
0
520,000
27
Produced Using Plan -It CIP Software Page 22 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 27-Pub-005
Project Name Lake Johanna Fire Dept Fire Station
Total Project $2,400,700
Cost
Type Improvement
Priority n/a
Description
Repayment of debt service for the construction of a new fire station.
Justification
Maintaining the fire station is critical to public safety.
Department
Category
Status
Public Safety
Public Safety
Active
Expenditures
2026
2027
2028
2029
2030
Total
Future
Other
0
265,800
269,050
266,800
269,300
1,070,950
1,329,750
Total 0
265,800
269,050
266,800
269,300
1,070,950
Funding Sources
2026
2027
2028
2029
2030
Total
Future
Other
0
265,800
269,050
266,800
269,300
1,070,950
1,329,750
Total 0
265,800
269,050
266,800
269,300
1,070,950
28
Produced Using Plan -It CIP Software Page 23 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Sew-002
Project Name Lift Station Rehabilitation
Total Project $1,607,000 Department Sanitary Sewer Department
Cost
Type Maintenance Category Sanitary Sewer Maintenance
Priority 2 Very Important Status Active
Useful Life 20 years TCAAP No
Description
Rehabilitation of lift stations to standardize and replace aging equipment, including pumps and electrical components.
2026:
• LS 1 is scheduled for two pump rebuilds. Parts and Labor cost- $20,000
• LS 4 is scheduled for two pump rebuilds. Parts and Labor cost- $20,000
• LS 5 is scheduled for a full wet well rehab. This includes 2 pump replacements, base elbows, wet well misc. plumbing, and wet well epoxy coating and bypass
pumping. Budget Estimate is $150,000
2027:
• LS11 is scheduled for 2 pump rebuilds. The budget cost is $20,000
• LS 12 is scheduled for 2 pump rebuilds. The budget cost is $20,000
• LS 9 is scheduled for 2 pump rebuilds. The budget cost is $20,000
2029:
• LS 8 is scheduled for a full wet well rehab. This includes 3 pump replacements, base elbows, wet well misc. plumbing, check valves, and wet well epoxy coating and
bypass pumping. Budget Estimate is $200,000
• LS 9 is scheduled for 2 pump rebuilds. The budget cost is $23,000
2030:
• LS 3 is scheduled for 2 pump rebuilds. The budget cost is $24,000
2032:
• LS 12 is scheduled for a full wet well rehab. This includes 2 pump replacements, base elbows, wet well misc. plumbing, check valves, and wet well epoxy coating and
bypass pumping. Budget Estimate is $200,000
Justification
The City has maintained a program to refurbish and update sanitary sewer lift stations on a frequencies that meet the demand and use, technology and risk management. Lift
station pumps are routinely inspected, tested and replaced as necessary to prevent failure.
Prior Expenditures 2026 2027 2028 2029 2030 Total Future
910,000 Construction/Maintenance 190,000 60,000 0 223,000 24,000 497,000 200,000
Total 190,000 60,000 0 223,000 24,000 497,000
Prior Funding Sources 2026 2027 2028 2029 2030 Total Future
910,000 Sanitary Sewer Utility Fund 190,000 60,000 0 223,000 24,000 497,000 200,000
Total 190,000 60,000 0 223,000 24,000 497,000
Budget Impact
Reduced maintenance costs.
29
Produced Using Plan -It CIP Software Page 24 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
27-Pub-001
Project Name
LJFD Engine/Ladder Replacement
Total Project
$486,759 Department Public Safety
Cost
Type
Equipment Category Public Safety
Priority
n/a Status Active
TCAAP
No
Description
Lake Johanna Fire Department provides the City with a Capital Budget each year outlining expected capital outflows the fire department has budgeted for the replacement of
Rescue/Command/Utility vehicles in future years.
2026. Engine/Ladder Replacement. Total Cost ($595,000) /Arden Hills Cost: $145,180
2027. Engine/Ladder Replacement. Total Cost ($615,000) / Arden Hills Cost: $150,060
2032: Engine/Ladder Replacement. Total Cost ($784,913) / Arden Hills Cost: $191,519
Justification
More detailed explanations can be found in the Lake Johanna Capital Budget.
Expenditures 2026 2027 2028 2029 2030 Total Future
Equip/Vehicles/Furnishings 145,180 150,060 0 0 0 295,240 191,519
Total 145.180 150.060 0 0 0 295.240
Funding Sources
2026
2027
2028
2029
2030
Total Future
Public Safety Capital Fund
145,180
150,060
0
0
0
295,240 191,519
Total 145,180
150,060
0
0
0
295,240
Budget Impact
There are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a result of this project would be
reflected in the fire services contract in reduced maintenance costs.
30
Produced Using Plan -It CIP Software Page 25 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Pub-003
Project Name LJFD General Equipment
Total Project $387,814 Department Public Safety
Cost
Type Equipment Category Public Safety
Priority n/a Status Active
TCAAP No
Description
Lake Johanna Fire Department provides a detailed capital budget, which includes the costs to each City
2026. SCBA Replacement, Tire Replacement, Radio Programming/Repair, Mobile Radio Replacement, 2026 Utility/UTV Equipment, Wildhand Hose/Nozzle/Bag Kits, New
Hire Turnout Gear, ID Printer. Total Cost ($833,007) / Arden Hills Cost ($203,254)
2027. Tire/Computer Replacement, Network Devices, Radio Programmer/Repair, 2027 Engine Equipment, New Hire Turnout Gear, Replacement Turnout Gear. Total Cost
($232,094) / Arden Hills Cost ($56,631)
2028. Tire Replacement, Radio Programming/Repair, New Hire Turnout Gear. Total Cost ($67,275) / Arden Hills Cost ($16,415)
2029. Tire/Computer/Mobile Tablet Replacement, Radio Programming/Repair, New Hire Turnout Gear, Replacement Turnout Gear. Total Cost ($217,912) / Arden Hills
Cost ($53,171)
2030. Tire/Computer Replacement. Total Cost ($31,025) / Arden Hills Cost ($7,570)
2031. Tire Replacement, Hydro Test SCBA Bottles. Total Cost ($13,660) 1 Arden Hills Cost ($3,333)
2032. Tire Replacement. Total Cost ($10,000) / Arden Hills Cost (2,440)
Justification
More detailed explanations can be found in the Lake Johanna Capital Budget.
Expenditures 2026
2027
2028
2029
2030
Total
Future
Equip/Vehicles/Furnishings 203,254
56,631
16,415
53,171
7,570
337,041
50,773
Total 203,254
56,631
16,415
53,171
7,570
337,041
Funding Sources 2026
2027
2028
2029
2030
Total
Future
Public Safety Capital Fund 203,254
56,631
16,415
53,171
7,570
337,041
50,773
Total 203,254
56,631
16,415
53,171
7,570
337,041
Budget Impact
There are no impacts to the operating budget of the City as it contracts for Fire Services
from Lake Johanna Fire Department. Any savings as a result of this project would be
reflected in the fire services contract in reduced maintenance costs.
31
Produced Using Plan -It CIP Software Page 26 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
27-Pub-002
Project Name
LJFD Rescue/Command/Utility Vehicle Replacement
Total Project
$379,495 Department Public Safety
Cost
Type
Equipment Category Public Safety
Priority
n/a Status Active
TCAAP
No
Description
Lake Johanna Fire Department provides the City with a Capital Budget each year outlining expected capital outflows the fire department has budgeted for the replacement of
Rescue/Command/Utility vehicles in future years.
2026. UV/Trailer/Utility Purchase. Total Cost ($210,000) /Arden Hills Cost ($51,240)
2027. Command/Vehicle Replacement. Total Cost ($120,000) / Arden Hills Cost($29,820)
2028. Rescue Replacement, Command Vehicle Replacement. Total Cost ($462,300) / Arden Hills Cost ($112,801)
2029. No Capital expected in 2026.
2030. Tanker/Utility Replacement. Total Cost ($441,000) / Arden Hills Cost ($107,604)
2031. Command/Vehicle Replacement. Total Cost ($153,154) 1 Arden Hills Cost ($37,370)
2032. No Capital expected in 2032.
2033. Command/Vehicle Replacement. Total Cost ($168,852) 1 Arden Hills Cost ($41,200)
Justification
More detailed explanations can be found in the Lake Johanna Capital Budget.
Expenditures
2026
2027
2028
2029
2030
Total
Future
Equip/Vehicles/Furnishings
51,240
29,280
112,801
0
107,604
300,925
78,570
Total 51,240
29,280
112,801
0
107,604
300,925
Funding Sources
2026
2027
2028
2029
2030
Total
Future
Public Safety Capital Fund
51,240
29,280
112,801
0
107,604
300,925
78,570
Total 51,240
29,280
112,801
0
107,604
300,925
Budget Impact
There are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a result of this project would be
reflected in the fire services contract in reduced maintenance costs.
32
Produced Using Plan -It CIP Software Page 27 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Pub-004
Project Name LJFD Station Capital
Total Project $188,592
Department Public Safety
Cost
Type Equipment
Category Public Safety
Priority n/a
Status Active
TCAAP No
Description
Lake Johanna Fire Department provides the City with a Capital Budget each year outlining expected capital outflows.
• 2026. No Capital expected for 2026.
• 2027. Total Cost is $268,000 / Arden Hills Cost is $65,392.
o Station 120 - Gear Dryer ($9,000); Arden Hills Cost ($2,178)
o Station 130 - Remodel of Admin Space to Staffed Station ($250,000),
Gear Dryer ($9,000); Arden Hills Cost ($62,678)
. 2028. Total Cost is $300,000 / Arden Hills Cost is $73,200.
o Roof Replacement ($300,000)
Justification
More detailed explanations can be found in the Lake Johanna Capital Budget.
Expenditures 2026
2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 0
65,392 73,200 0 0 138,592
Total 0
65,392 73,200 0 0 138,592
Funding Sources
2026
2027
2028
2029
2030
Total
Public Safety Capital Fund
0
65,392
73,200
0
0
138,592
Total 0
65,392
73,200
0
0
138,592
Future
50,000
Future
50,000
Budget Impact
There are no impacts to the operating budget of the City as it contracts for Fire Services from Lake Johanna Fire Department. Any savings as a result of this project would be
reflected in the fire services contract in reduced maintenance costs.
33
Produced Using Plan -It CIP Software Page 28 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
27-Park-003
Project Name
Old Hwy 10 Trail - 96 to Valentine Park
Total Project
$4,635,000
Contact
Public Works Director
Cost
Department
Parks Department
Type
Improvement
Category
Park Capital Improvements
Priority
n/a
Status
Active
Useful Life
25 years
TCAAP
No
Description
Construction of a new 6,500-feet in length, grade separated, 10-ft wide bituminous trail along the West side of Old Highway 10 from Lake Valentine Rd to Lakeshore Pl.
Justification
The new trail will improve safety and adequately accommodate pedestrians & bicyclists along the Old Highway 10 Corridor between Lake Valentine Rd and Lakeshore PI in
Arden Hills. The proposed trail improvements will complete the North -South connection from MN-51 to Hwy-96.
Expenditures 2026 2027 2028 2029 2030 Total
Construction/Maintenance 0 4,635,000 0 0 0 4,635,000
Total 0 4,635,000 0 0 0 4,635,000
Funding Sources
2026
2027
2028
2029
2030
Total
Grants
0
2,000,000
0
0
0
2,000,000
Capital Improvement Funds (PIR)
0
1,317,500
0
0
0
1,317,500
Ramsey County
0
1,317,500
0
0
0
1,317,500
Total 0
4,635,000
0
0
0
4,635,000
Budget Impact
The 6,500-feet of new trail will be the responsibility of the City to maintain. Maintenance includes, snow/ice control (seasonally), crack sealing and fog sealing (approx. every
5 years).
34
Produced Using Plan -It CIP Software Page 29 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Park-008
Project Name Park Shelter Replacements
Total Project
$185,000
Contact
Park & Recreation Mgr
Cost
Department
Parks Department
Type
Improvement
Category
Park Capital Improvements
Priority
4 Less Important
Status
Active
TCAAP
No
Description
Replace existing park shelters:
2029: Royal Hills Park - $92,500; Hazelnut Park - $92,500
Justification
Shelters are deteriorating and reaching the end of service life.
Expenditures
2026
2027
2028
2029
2030
Total
Construction/Maintenance
85,000
0
185,000
Total
0
0
0
185,000
0
185,000
Funding Sources
2026
2027
2028
2029
2030
Total
Capital Improvement Funds (PIR)
0
0
0
185,000
0
185,000
Total
0
0
0
185,000
0
185,000
35
Produced Using Plan -It CIP Software Page 30 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 25-Park-007
Project Name Parks Master Plan
Total Project
$175,000
Department
Parks Department
Cost
Type
Unassigned
Category
Park Capital Improvements
Priority
2 Very Important
Status
Active
Useful Life
8 years
TCAAP
No
Description
Development of a City-wide Parks Master Plan
Prior
Expenditures
2026
2027
2028
2029
2030
Total
Future
75,000
Planning/Design
10,000
10,000
10,000
10,000
10,000
50,000
50,000
Total 10,000
10,000
10,000
10,000
10,000
50,000
Prior
Funding Sources
2026
2027
2028
2029
2030
Total
Future
75,000
Capital Improvement Funds (PIR)
10,000
10,000
10,000
10,000
10,000
50,000
50,000
Total 10,000
10,000
10,000
10,000
10,000
50,000
36
Produced Using Plan -It CIP Software Page 31 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
27-Park-002
Project Name
Perry Park Improvements
Total Project
$545,000 Department Parks Department
Cost
Type
Improvement Category Park Capital Improvements
Priority
4 Less Important Status Active
TCAAP
No
Description
Parking lot pavement rehabilitation project involving full -depth reclamation, spot curb repairs, ADA improvements and subgrade soil corrections - $485,000;
Ball field and dog park grading, irrigation improvements, fencing repairs - $70,000; (Grade two fields in 2027 and two fields in 2028)
Justification
Parking lot pavement is deteriorating and reaching the end of service life. Public Works has placed large area patches to extend usability. Cost of maintenance is increasing
each year.
Expenditures
2026
2027
2028
2029
2030
Total
Construction/Maintenance
0
520,000
25,000
0
0
545,000
Total 0
520,000
25,000
0
0
545,000
Funding Sources
2026
2027
2028
2029
2030
Total
Capital Improvement Funds (PIR)
0
520,000
25,000
0
0
545,000
Total 0
520,000
25,000
0
0
545,000
37
Produced Using Plan -It CIP Software Page 32 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Eqp-004
Project Name Pipeline Inspection Push Camera System
Total Project $12,000 Department Equipment
Cost
Type Equipment Category Equipment: Public Works
Priority 3Important Status Active
Useful Life 15 years
Description
Push camera for pipeline maintenance and inspection within the citv's surface water system and sanitary sewer. This camera is able to inspect pipes smaller than 8 inches in
Justification
The push camera system can be utilized for pipeline inspection and for utility locating and line tracing. It's another tool Public Work can utilize for emergencies and
maintenance functions.
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 12,000 0 0 0 0 12,000
Total 12,000
0
0
0
0
12,000
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund 12,000 0 0 0 0 12,000
Total 12,000 0 0 0 0 12,000
38
Produced Using Plan -It CIP Software Page 33 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 27-Park-001
Project Name Playground Structure Replacement
Total Project $1,805,000 Department Parks Department
Cost
Type Improvement Category Park Capital Equipment
Priority 3Important Status Active
TCAAP No
Description
Play Structures are programmed for replacement on a 20-year cycle.
2027: Ingerson Park (last replaced in 2000) - $260,000; Sampson Park (last replaced 2001) - $260,000;
2029: Royal Hills Park last replaced 2002 - $275,000;
2033: Valentine Park last replaced 2013 - $310,000;
2037: Hazelnut Park - $350,000; Perry Park - $350,000;
2039: Cummings Park; Johanna Marsh Park;
2043: Arden Manor Park; Floral Park; South Shore Fitness Park
Justification
In order to maintain playground structures that meet current safety guidelines, require a minimum amount of maintenance, and have replacement parts available, the City is
attempting to maintain a replacement schedule for playground facilities based on available funds.
Expenditures
2026
2027
2028
2029
2030
Total
Future
Construction/Maintenance
0
520,000
0
275,000
0
795,000
1,010,000
Total 0
520,000
0
275,000
0
795,000
Funding Sources 2026
2027
2028
2029
2030
Total Future
Capital Improvement Funds (PIR) 0 520,000 0 275,000 0 795,000 1,010,000
Total 0 520,000 0 275,000 0 795,000
39
Produced Using Plan -It CIP Software Page 34 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 25-Eqp-001
Project Name Replace 1993 Case 621 Loader #103
Total Project
$300,000
Department Equipment
Cost
Type
Equipment
Category Vehicles
Priority
n/a
Status Active
Useful Life
20 years
TCAAP No
Description
Vehicle #103 - 1993 Case 621 Loader & Plow Total Hours 3,683
Hour gauge: 2018 - 3,073; 2019 - 3,344; 2020 - Not available; 2021 - 3,438; 2022 - 3,50;1 2023 - Not available; 2024 - 3,630; 2025 - TBD
New Loader estimate - $225,000
Frontwing/Plow - $75,000
Justification
Vehicle will be 33 years old.
This piece of equipment is used year round for loading trucks, stock pile management, and is a backup to our snow plow fleet. Also, during emergencies, it is used for
clearing trees to open roadways and access utilities. Due to its age, this loader is showing deterioration and some significant corrosion. Replacement parts are hard to find
and equipment is at end of life for wiring, hoses, and hydraulic seals. Downtime is increasing with constantly repairing fluid leaks from old lines and broken fittings. Staff
recommends replacement in 2026.
Fleet CEP Points Replacement Guidelines Rating is 63.5 (Needs immediate consideration)
Parts and labor costs:
Total
PM
Repairs
2019 - $1,652
2020 - $2,361
2021 - $5,150;
$1,070;
$4,080
2022 - $2,220;
$2,220;
$0
2023 - $0
2024 - $3,766;
$0
$3,766 (2 weeks of total downtime)
2025 (June) - TBD
$325
$2,120 (2 weeks of total downtime)
Duties for Loader:
Snow plowing, Wing back banks, Bucket snow in cul-da-sacs, PW shop materials handling, Storm damage management, Stuck equipment recovery.
40
Produced Using Plan -It CIP Software Page 35 / 75
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 0 300,000 0 0 0 300,000
Funding Sources
Equipment/Building Replacement Fund
Total 0
300,000
0
0
0
300,000
2026
2027
2028
2029
2030
Total
0
275,000
0
0
0
275,000
Trade -In Value 0 25,000 0 0 0 25,000
Total 0 300,000 0 0 0 300,000
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
26-Eqp-002
Project Name
Replace 1996 Redi-Haul Trailer 4108
Total Project
$18,000
Department
Equipment
Cost
Type
Equipment
Category
Equipment: Public Works
Priority
3Important
Status
Active
Useful Life
20 years
TCAAP
No
Description
Replace 1996 Redi-Haul trailer.
Estimated auction return $1,500
Justification
This trailer is used mainly within the streets department to transport the asphalt roller and other miscellaneous equipment. The trailer is also used in Parks frequently when
not in Street Maintenance. Corrosion is evident. Current trailer has a heavy ramp, replacement with a tilt -deck is preferred.
Fleet CEP Points Replacement Guidelines Rating is 37 (Needs immediate consideration)
Preventative maintenance and repair costs:
2022 - PM: $366; Repairs: $0
2023 - PM: $30; Repairs: $0
2024 - PM: $342; Repairs: $0
2025 (June) - PM: $20; Repairs: $0
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings
Funding Sources
18,000 0 0 0 0 18,000
Total 18,000 0 0 0 0 18,000
2026 2027 2028 2029 2030 Total
Equipment/Building Replacement Fund 16,500 0 0 0 0 16,500
Trade -In Value 1,500 0 0 0 0 1,500
Total 18,000 0 0 0 0 18,000
41
Produced Using Plan -It CIP Software Page 36 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 28-Eqp-003
Project Name Replace 1998 Tow Behind
Air Compressor #107
Total Project $36,050
Department Equipment
Cost
Type Equipment
Category Equipment: Public Works
Priority 3Important
Status Active
Useful Life 30 years
TCAAP No
Description
Replace 1998 LeRoi tow behind Air Compressor. Replacement parts becoming obsolete.
Hours (June 2025): 581
Estimated auction return - $1,500
Justification
This piece of equipment is used for street and irrigation maintenance. In 2028, this equipment will be 30 years old and past its useful life.
Fleet CEP Points Replacement Rating is 41 (Needs immediate consideration)
Repair costs between 2019- 2022- $1,250
2023 - $190 PM
2024 - $292 PM
2025 - $384 Repair
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 0 0 36,050 0 0 36,050
Total 0 0 36,050 0 0 36,050
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
0
34,550
0
0
34,550
Trade -In Value
0
0
1,500
0
0
1,500
Total 0
0
36,050
0
0
36,050
42
Produced Using Plan -It CIP Software Page 37 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 27-Eqp-002
Project Name Replace 2000 Backhoe #204
Total Project $172,010 Department
Equipment
Cost
Type Equipment Category
Equipment: Public Works
Priority 3Important Status
Active
Useful Life 20 years TCAAP
No
Description
Replace 2000 Case 590 Super L Backhoe.
Current Hours (June 2025): 3,552
Estimated auction return - $15,000
Justification
This piece of equipment is used in streets, water, and miscellaneous needs department wide and around the PW Facility. Due to age and corrosion, staff recommends
replacement in 2027. The backhoe will be 27 years old.
Fleet CEP Points Replacement Guidelines Rating is 55.5 (Needs immediate consideration)
Repairs costs 2019-2022: $7,956.
2023: $0
2024: Repairs - $4,299; $0 PM;
2025: TBD
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 0 172,010 0 0 0 172,010
Total 0 172,010 0 0 0 172,010
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
157,010
0
0
0
157,010
Trade -In Value
0
15,000
0
0
0
15,000
Total 0
172,010
0
0
0
172,010
43
Produced Using Plan -It CIP Software Page 38 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 28-Eqp-002
Project Name Replace 2009 Husqavarna Pavement Saw #113
Total Project $10,300
Contact
Public Works Director
Cost
Department Equipment
Type
Equipment
Category Equipment: Public Works
Priority
3 Important
Status Active
Useful Life
15 years
TCAAP No
Description
Replace walk behind pavement saw.
Hours (June) - 111
Estimated auction return - $2,500
Justification
This saw is used to cut asphalt and concrete for street patching and concrete repairs. In 2028, this equipment will be 19 years old and past its useful life.
Fleet CEP Points Replacement Guidelines Rating is 23.6 (Qualifies for replacement)
Repair costs between 2019- 2023- $1,300
2024 - $0
2025 (June) - $0
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 0 0 0 10,300 0 10,300
Total 0 0 0 10,300 0 10,300
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
0
0
7,800
0
7,800
Trade -In Value
0
0
0
2,500
0
2,500
Total 0
0
0
10,300
0
10,300
44
Produced Using Plan -It CIP Software Page 39 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 27-EgpV-001
Project Name Replace 2009 Sterling Acterra Truck #431
Total Project $303,635
Department Equipment
Cost
Type Equipment
Category Vehicles
Priority 3Important
Status Active
Useful Life 10 years
TCAAP No
Description
Replace 2009 1,500 gallon tanker truck used for watering, sweeping, dust control and rink flooding. Mileage 27,400
** This equipment was ordered by Council approval on xx, 2025.
**Delivery of chassis will be received in 2026; Buildout invoices will occur in 2027.
Justification
Current vehicle will be 18 years old in 2027. Corrosion due to winter operations and availability of parts.
Fleet CEP Points Replacement Guidelines Rating is 31.75 (Needs immediate consideration)
Parts and labor costs:
2018 - $2,112
2019 - $2,618
2020 - $3,303
2021- $2,060
2022 - $5,613 - PM: $600; Repairs $5,013
2023 - $ 323 - PM: $323; Repairs $0
2024 - TBD
Duties: Watering trees/gardens Filling garden barrels Assisting with sewer cleaning operations Pressure washing water source Rink flooding Assist with street sweeping
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings
144,500
159,135
0
0
0
303,635
Funding Sources
Total 144,500
2026
159,135
2027
0
2028
0
2029
0
2030
303,635
Total
EquipmenUBuilding Replacement Fund
144,500
139,135
0
0
0
283,635
Trade -In Value
0
20,000
0
0
0
20,000
Total 144,500
159,135
0
0
0
303,635
45
Produced Using Plan -It CIP Software Page 40 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
29-Eqp-003
Project Name
Replace 2012 Workman #445
Total Project
$36,050 Department
Equipment
Cost
Type
Equipment Category
Equipment: Public Works
Priority
3Important Status
Active
Useful Life
13 years TCAAP
No
Description
Current Hours (June 2025): 901
Justification
Fleet CEP Points Replacement Guidelines Rating is 24.5 (Qualifies for replacement)
Preventative maintenance and repair costs:
PM; Repairs;
2023 - $45; $0;
2024 - $60; $540;
Expenditures
2026
2027
2028
2029
2030
Total
Equip/Vehicles/Furnishings
0
0
0
36,050
0
36,050
Total 0
0
0
36,050
0
36,050
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
0
0
36,050
0
36,050
Total 0
0
0
36,050
0
36,050
46
Produced Using Plan -It CIP Software Page 41 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-EgpV-003
Project Name Replace 2013 Ford Escape #504
Total Project $41,500
Department Equipment
Cost
Type Equipment
Category Vehicles
Priority n/a
Status Active
Useful Life 10 years
TCAAP No
Description
Replace 2013 Ford Escape.
Current Mileage (June 2025): 69,000
Justification
The current vehicle will be 13 years old and there is corrosion on the undercarriage. A multipurpose vehicle, like an Escape, will serve other City employees when they want
to use a City vehicle to attend meetings and conferences - especially when they are out of town.
Fleet CEP Points Replacement Guidelines Rating is 29.7 (Needs immediate consideration)
Preventative maintenance and repair costs:
2018 - $ 429
2019 - $1,205
2020 - $ 0
2021 - $ 530
2022 - $ 48 PM; $0 Repairs
2023 - $ 85 PM; $0 Repairs
2024 - $ 680 PM; $390 Repairs
2025 - $40 PM; $150 Repairs
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 0 41,500 0 0 0 41,500
Total 0 41,500 0 0 0 41,500
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
33,500
0
0
0
33,500
Trade -In Value
0
8,000
0
0
0
8,000
Total 0
41,500
0
0
0
41,500
Budget Impact
Cost of maintenance.
47
Produced Using Plan -It CIP Software Page 42 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 27-EgpV-003
Project Name Replace 2015 Ford F-450 Plow/Dump Truck #320
Total Project $145,000
Department Equipment
Cost
Type Equipment
Category Vehicles
Priority 2 Very Important
Status Active
Useful Life 10 years
TCAAP No
Description
Replace 2015 Ford F-450 Plow/ Dump Truck. This replacement would include plow, dump body and salt spreader with related controls.
Mileage: 35,000
Estimated auction return $25,000
Justification
This truck is a primarily used year round for street route snow plowing, park maintenance, surface water repairs, and miscellaneous utility projects. A 12 year replacement
cycle is recommended for reliability and maximizing return on investment.
Fleet CEP Points Replacement Guidelines Rating is 28.5 (Needs immediate consideration)
Repair costs through 2019-2023 total - $9,850
2024 - $1,327; $695; $632;
2025 (June) - TBD; $0 $2,182;
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 0 145,000 0 0 0 145,000
Total 0 145,000 0 0 0 145,000
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
120,000
0
0
0
120,000
Trade -In Value
0
25,000
0
0
0
25,000
Total 0
145,000
0
0
0
145,000
Budget Impact
Reduced repair and maintenance costs.
48
Produced Using Plan -It CIP Software Page 43 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 27-EgpV-002
Project Name Replace 2016 F-350 Pickup w/Liftgate #455
Total Project $84,975
Department Equipment
Cost
Type Equipment
Category Vehicles
Priority 4 Less Important
Status Active
Useful Life 10 years
TCAAP No
Description
Vehicle #455 - 2016 Ford F-350 Crew Cab with Liftgate (parks).
VIN # 3955
Mileage: 61,000 (June 2025)
Justification
The crew cab truck is used year round for efficiency with more staff seating. Seasonal staff can utilize one truck for up to 4 people. Due to rising repair costs, the
recommendation is to replace at 10 years.
Fleet CEP Points Replacement Guidelines Rating is 23.1 (Qualifies for replacement)
Parts and labor costs:
2019 - $ 965;
2020 - $ 486;
2021 - $1,200;
2022 - $1,408;
2023 - $ 435;
2024 - $4,865; $721; $4,144
2025 (June) - TBD
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 0 84,975 0 0 0 84,975
Total 0 84,975 0 0 0 84,975
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
74,975
0
0
0
74,975
Trade -In Value
0
10,000
0
0
0
10,000
Total 0
84,975
0
0
0
84,975
Budget Impact
Reduce maintenance and repair costs.
49
Produced Using Plan -It CIP Software Page 44 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-EgpV-001
Project Name Replace 2016 F-350 wN-Plow
and Liftgate #215
Total Project $85,000
Department Equipment
Cost
Type Equipment
Category Vehicles
Priority 3Important
Status Active
Useful Life 10 years
TCAAP No
Description
Vehicle #215 - 2016 Ford F-350 Regular Cab with V-Plow and Liftgate (streets).
VIN # 3941 Mileage 54,000 (June 2025)
Justification
The pickup is used year round for Public Works operations but the primary use is plowing trails, sidewalks and parking lots, bulk fuel tank, refueling Parks equipment and
generators. Due to plowing stress and corrosion factors, staff recommends replacement at 10 years.
FLEET CEP Points Replacement Guidelines Ratings Score: 31.3 (Needs immediate consideration)
Parts and labor costs:
Total; PM; Repairs;
2019 - $1,104;
2020 - $ 989;
2021 - $1,285;
2022 - $1,408; $210; $1,198;
2023 - $5,392; $120; $5,272;
2024 - $ 2,131; $126; $2,005;
2025 (June) - $73; $1767; $1,840;
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 85,000 0 0 0 0 85,000
Total 85,000 0 0 0 0 85,000
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
70,000
0
0
0
0
70,000
Trade -In Value
15,000
0
0
0
0
15,000
Total 85,000
0
0
0
0
85,000
Budget Impact
Reduce maintenance and repair costs.
50
Produced Using Plan -It CIP Software Page 45 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 28-Eqp-004
Project Name Replace 2016 Stepp Asphalt Patch Trailer #121
Total Project $77,250 Department
Equipment
Cost
Type Equipment Category
Equipment: Public Works
Priority 3Important Status
Active
Useful Life 10 years TCAAP
No
Description
Replace 2016 Stepp Asphalt Patch Trailer. Estimated auction return - $25,000
Justification
The patch trailer is used for street maintenance operations. This equipment will be 12 years
old in 2028, near the end of its useful life and also with a relatively high auction
return.
Fleet CEP Points Replacement Guidelines Rating is 21 (Good condition)
Preventative maintenance and repair costs:
Repair costs between 2019- 2022- $4,665
Expenditures
2026
2027
2028
2029
2030
Total
EquipNehicles/Furnishings
Funding Sources
0
Total 0
2026
0
0
2027
77,250
77,250
2028
0
0
2029
0
0
2030
77,250
77,250
Total
Equipment/Building Replacement Fund
0
0
52,250
0
0
52,250
Trade -In Value
0
0
25,000
0
0
25,000
Total 0
0
77,250
0
0
77,250
51
Produced Using Plan -It CIP Software Page 46 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 30-Eqp-002
Project Name Replace 2016 Workman #456
Total Project $36,050 Department
Cost
Type Equipment Category
Priority 3Important Status
Useful Life 13 years TCAAP
Justification
Fleet CEP Points Replacement Guidelines Rating is 14.5 (Excellent condition)
Preventative maintenance and repair costs:
PM; Repairs;
2023 - $?; $0;
2024 - $?; $0;
Expenditures
Equip/Vehicles/Furnishings
Funding Sources
Equipment/Building Replacement Fund
Total
Total
Equipment
Equipment: Public Works
Active
No
2026
2027
2028
2029
2030
Total
0
0
0
0
36,050
36,050
0
0
0
0
36,050
36,050
2026
2027
2028
2029
2030
Total
0
0
0
0
36,050
36,050
0
0
0
0
36,050
36,050
52
Produced Using Plan -It CIP Software Page 47 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 28-EgpV-001
Project Name Replace 2017 Mack Plow/Wing/Dump Truck #123
Total Project $362,200
Department Equipment
Cost
Type Equipment
Category Vehicles
Priority 5 Future Consideration
Status Active
Useful Life 10 years
TCAAP No
Description
Vehicle #123 - 2017 Mack Single Axle Plow Wing Dump Truck (streets)
Mileage (June 2025): 17,620
Justification
Due to long lead times for specifying, ordering and taking delivery, staff recommends ordering the plow truck chassis in 2027 and doing the build out in 2028. This will provide
time to take delivery of a finished truck by 2029, making the current one 12 years old.
Fleet CEP Points Replacement Guidelines Rating is 19.8 (Good condition)
Repair costs for parts and labor:
Total PM Repair
2019 - $3,206;
2020 - $4,557;
2021 - $9,092;
2022 - $8,443;
2023 - $7,394;
2024 - $5,022; $1,022; $4,000
2025 - $2,362; $462; $1,900
Expenditures
Equip/Vehicles/Furnishings
Funding Sources
Equipment/Building Replacement Fund
Trade -In Value
2026
2027
2028
2029
2030
Total
0
154,500
207,700
0
0
362,200
Total 0
154,500
207,700
0
0
362,200
2026
2027
2028
2029
2030
Total
0
154,500
172,700
0
0
327,200
0
0
35,000
0
0
35,000
Total 0
154,500
207,700
0
0
362,200
Budget Impact
Reduce repair and maintenance costs and improve reliability of our primary snow removal equipment.
53
Produced Using Plan -It CIP Software Page 48 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
30-EgpV-001
Project Name
Replace 2018 Ford Escape #505
Total Project
$41,200
Department Equipment
Cost
Type
Equipment
Category Vehicles
Priority
n/a
Status Active
Useful Life
10 years
TCAAP No
Description
Current miles (June 2025): 27,500
Justification
Fleet CEP Points Replacement Guidelines Rating is 14.7 (Excellent condition)
Preventative maintenance and repair costs:
PM; Repairs;
2023 - $70; $0;
2024 - $60; $0;
Expenditures
2026
2027
2028
2029
2030
Total
Equip/Vehicles/Furnishings
0
0
0
0
41,200
41,200
Total 0
0
0
0
41,200
41,200
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
0
0
0
41,200
41,200
Total 0
0
0
0
41,200
41,200
54
Produced Using Plan -It CIP Software Page 49 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Eqp-001
Project Name Replace 2018 Toro Large Area Mower #457
Total Project $114,000
Department
Equipment
Cost
Type Equipment
Category
Equipment: Public Works
Priority 3Important
Status
Active
Useful Life 10 years
TCAAP
No
Description
Replacement of the 2018 Toro large area mower.
Hours (June 2025) - 1,825
Justification
The Toro large area mower will be 8 years old in 2026. This mower is a key piece of equipment for mowing operations. To avoid downtime, staff recommends replacement
prior to costly repairs.
Fleet CEP Points Replacement Guidelines Rating is 27 (Qualifies for replacement)
Preventative maintenance and repair costs:
2019 - $230
2020 - $739
2021 - $260
2022 - PM: $260
2023 - PM: $125
2024 - PM: $3,650; Repairs: $2,087
2025 (June) - PM: $85; Repairs $2,866 (2 weeks total downtime)
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 114,000 0 0 0 0 114,000
Total 114,000 0 0 0 0 114,000
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
94,000
0
0
0
0
94,000
Trade -In Value
20,000
0
0
0
0
20,000
Total 114,000
0
0
0
0
114,000
55
Produced Using Plan -It CIP Software Page 50 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 29-Eqp-002
Project Name Replace 2019 Bobcat Miller/Planer #129
Total Project $16,480 Department
Cost
Type Equipment Category
Priority 3Important Status
TCAAP No
Justification
Fleet CEP Points Replacement Guidelines Rating is 17 (Excellent condition)
Preventative maintenance and repair costs:
PM Repair
2023 - $60; $0;
2024 - $150; $0;
Expenditures
Equip/Vehicles/Furnishings
Funding Sources
Equipment/Building Replacement Fund
Total
Total
Equipment
Equipment: Public Works
Active
2026
2027
2028
2029
2030
Total
0
0
0
16,480
0
16,480
0
0
0
16,480
0
16,480
2026
2027
2028
2029
2030
Total
0
0
0
16,480
0
16,480
0
0
0
16,480
0
16,480
56
Produced Using Plan -It CIP Software Page 51 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 29-EgpV-001
Project Name Replace 2019 Ford F-150 #602
Total Project $46,350
Cost
Type Equipment
Priority 3Important
Useful Life 10 years
Description
Current miles (June 2025): 17,000
Justification
Fleet CEP Points Replacement Guidelines Rating is 11.7 (Excellent condition)
Preventative maintenance and repairs:
PM; Repairs;
2022 - $84; $0
2023 - $282; $0
2024 - $84; $0
Expenditures
Equip/Vehicles/Furnishings
Funding Sources
Equipment/Building Replacement Fund
Trade -In Value
Total
Total
Department
Equipment
Category
Vehicles
Status
Active
TCAAP
Yes
2026
2027
2028
2029
2030
Total
0
0
0
46,350
0
46,350
0
0
0
46,350
0
46,350
2026
2027
2028
2029
2030
Total
0
0
0
31,350
0
31,350
0
0
0
15,000
0
15,000
0
0
0
46,350
0
46,350
57
Produced Using Plan -It CIP Software Page 52 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 28-EgpV-002
Project Name Replace 2019 Ford F-150 Ext Cab #601
Total Project $46,350
Cost
Type Equipment
Priority 3Important
Useful Life 8 years
Description
Replace 2019 F-150 Extended Cab 4x4 Pickup.
Mileage (June 2025); 37,800
Estimated auction return - $15,000
Department
Equipment
Category
Vehicles
Status
Active
TCAAP
Yes
Justification
The truck is used for miscellaneous use across departments within Public Works. In 2028, the truck will be 9 years old and at its useful life expected.
Fleet CEP Points Replacement Guidelines Rating is 15.8 (Excellent condition)
Repair costs between 2019- 2022- $2,576
Total PM Repair
2023: $129; $129; $0;
2024: $1,120; $873; $247;
2025 (June): TBD; $82; $0;
Expenditures
2026
2027
2028
2029
2030
Total
EquipNehicles/Furnishings
0
0
46,350
0
0
46,350
Funding Sources
Total 0
2026
0
2027
46,350
2028
0
2029
0
2030
46,350
Total
Equipment/Building Replacement Fund
0
0
31,350
0
0
31,350
Trade -In Value
0
0
15,000
0
0
15,000
Total 0
0
46,350
0
0
46,350
58
Produced Using Plan -It CIP Software Page 53 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 29-EgpV-002
Project Name Replace 2019 Ford F350 Crew Cab
w/Tommygate #85323
Total Project $77,250
Department Equipment
Cost
Type Equipment
Category Vehicles
Priority 4 Less Important
Status Active
Useful Life 10 years
TCAAP No
Description
Current miles (June 2025): 13,000
Asset 85323
Justification
Fleet CEP Points Replacement Guidelines Rating is 17
Preventative maintenance and repair costs:
PM; Repairs;
2023 - $101; $0
2024 - $90; $0
Expenditures
2026
2027
2028
2029
2030
Total
Equip/Vehicles/Furnishings
0
0
0
77,250
0
77,250
Total 0
0
0
77,250
0
77,250
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
0
0
77,250
0
77,250
Total 0
0
0
77,250
0
77,250
59
Produced Using Plan -It CIP Software Page 54 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 30-EgpV-002
Project Name Replace 2020 Ford F-150 #603
Total Project $46,350
Cost
Type Equipment
Priority 3Important
Useful Life 10 years
Description
Current miles (June 2025): 12,700
Justification
Fleet CEP Points Replacement Guidelines Rating is 12.7 (Excellent condition)
Preventative maintenance and repair costs:
PM; Repairs;
2022 - $90; $0;
2023 - $62; $0;
2024 - $60; $0;
Expenditures
Equip/Vehicles/Furnishings
Funding Sources
Equipment/Building Replacement Fund
Total
Total
Department
Equipment
Category
Vehicles
Status
Active
TCAAP
Yes
2026
2027
2028
2029
2030
Total
0
0
0
0
46,350
46,350
0
0
0
0
46,350
46,350
2026
2027
2028
2029
2030
Total
0
0
0
0
46,350
46,350
0
0
0
0
46,350
46,350
60
Produced Using Plan -It CIP Software Page 55 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
30-EgpV-004
Project Name
Replace 2022 Ford F-250 w/Service Body
Total Project
$82,400
Department Equipment
Cost
Type
Equipment
Category Vehicles
Priority
3Important
Status Active
Useful Life
10 years
TCAAP Yes
Description
Current miles (June 2025): 23,100
Justification
Fleet CEP Points Replacement Guidelines Rating is 13.1 (Excellent condition)
Preventative maintenance and repair costs:
PM; Repairs;
2023 - $90; $0;
2024 - $105; $0;
Expenditures
2026
2027
2028
2029
2030
Total
Equip/Vehicles/Furnishings
0
0
0
0
82,400
82,400
Total 0
0
0
0
82,400
82,400
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
0
0
0
82,400
82,400
Total 0
0
0
0
82,400
82,400
61
Produced Using Plan -It CIP Software Page 56 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
30-EgpV-003
Project Name
Replace 2022 Ford F-350 w/Plow & Tommygate
Total Project
$82,400
Department Equipment
Cost
Type
Equipment
Category Vehicles
Priority
4 Less Important
Status Active
Useful Life
10 years
TCAAP No
Description
Current miles (June 2025): 13,300
Justification
Fleet CEP Points Replacement Guidelines Rating is 12.7 (Excellent condition)
Preventative maintenance and repair costs:
PM; Repairs;
2023 - $74; $0;
2024 - $82; $0;
Expenditures
2026
2027
2028
2029
2030
Total
Equip/Vehicles/Furnishings
0
0
0
0
82,400
82,400
Total 0
0
0
0
82,400
82,400
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
0
0
0
82,400
82,400
Total 0
0
0
0
82,400
82,400
62
Produced Using Plan -It CIP Software Page 57 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 29-Eqp-004
Project Name Replace 2023 Bobcat Toolcat
#85478
Total Project $77,100
Department
Cost
Type Equipment
Category
Priority 2 Very Important
Status
Useful Life 5 years
TCAAP
Description
Current Hours (June 2025): 230
Justification
Fleet CEP Points Replacement Guidelines Rating is 13.6 (Excellent condition)
Preventative maintenance and repair costs:
PM; Repairs;
2024 - $251; $1,930
Expenditures
Equip/Vehicles/Furnishings
Funding Sources
Equipment/Building Replacement Fund
Trade -In Value
Total
Total
Equipment
Equipment: Public Works
Active
No
2026
2027
2028
2029
2030
Total
0
0
0
77,100
0
77,100
0
0
0
77,100
0
77,100
2026
2027
2028
2029
2030
Total
0
0
0
47,100
0
47,100
0
0
0
30,000
0
30,000
0
0
0
77,100
0
77,100
63
Produced Using Plan -It CIP Software Page 58 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 30-Eqp-004
Project Name Replace 2025 Bobcat Toolcat
Total Project $80,000
Contact
Public Works Director
Cost
Department Equipment
Type
Equipment
Category Equipment: Public Works
Priority
3 Important
Status Active
Useful Life
5 years
Description
The toolcat is used throughout all division of PW. One primary use is snow removal from trails and sidewalks citywide.
Justification
The 5-7 year replacement cycle is what PW has programmed historically for replacement of our Toolcats. This is due to higher resale value and corrosion factors that lead to
increased repairs and downtime.
Expenditures 2026 2027 2028 2029 2030 Total
Unassigned 0 0 0 0 80,000 80,000
Total 0 0 0 0 80,000 80,000
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
0
0
0
50,000
50,000
Trade -In Value
0
0
0
0
30,000
30,000
Total 0
0
0
0
80,000
80,000
64
Produced Using Plan -It CIP Software Page 59 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 30-Eqp-005
Project Name Replace 2 Toro Zero Turn Mowers Asset 85485, 85486
Total Project $42,000 Contact Public Works Director
Cost
Department Equipment Type Equipment
Category Park Capital Equipment Priority 3 Important
Status Active Useful Life 5 years
Description
The zero turn mowers are used to mow city property, boulevards/ medians, and is primarily used in the parks Spring, Summer, and Fall.
Justification
Historically PW has recommended replacing our two zero turn mowers every 3 years due to resale and a manufacturers warranty for 3 years. The machines that were
purchased in 2025 now come with a 5 year warranty. PW now recommends replacement of the machines in 5 years for this cycle and evaluate in 2030 whether to continue
recommending a 5 year replacement cycle.
Expenditures 2026 2027 2028 2029 2030 Total
Unassigned 0 0 0 0 42,000 42,000
Total 0
0
0
0
42,000
42,000
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund 0 0 0 0 28,000 28,000
Trade -In Value 0 0 0 0 14,000 14,000
Total 0 0 0 0 42,000 42,000
65
Produced Using Plan -It CIP Software Page 60 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 30-Eqp-003
Project Name Replace Bobcat Rotary Brushcutter #440
Total Project $15,450 Department
Cost
Type Equipment Category
Priority 2 Very Important Status
TCAAP No
Justification
Fleet CEP Points Replacement Guidelines Rating is 22 (Good condition)
Expenditures
Equip/Vehicles/Furnishings
Total
Funding Sources
Equipment/Building Replacement Fund
Total
Equipment
Equipment: Public Works
Active
2026
2027
2028
2029
2030
Total
0
0
0
0
15,450
15,450
0
0
0
0
15,450
15,450
2026
2027
2028
2029
2030
Total
0
0
0
0
15,450
15,450
0
0
0
0
15,450
15,450
66
Produced Using Plan -It CIP Software Page 61 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 28-Eqp-001
Project Name Replace Bobcat Snowblower
84" #118
Total Project $9,270
Department
Equipment
Cost
Type Equipment
Category
Equipment: Public Works
Priority 3Important
Status
Active
Useful Life 10 years
TCAAP
No
Description
Replacement of a Bobcat Snowblower attachment used for snow removal along sidewalks, trails, parking lots, and miscellaneous snow removal needs.
Estimated auction return - $2,000
Justification
The attachment will be at the end of its useful life in 2028.
Fleet CEP Points Replacement Guidelines Rating is 20 (Good condition)
2019- 2023 repairs costs- $328
2024 - $0
2025 (June) - TBD
Expenditures
2026
2027
2028
2029
2030
Total
Equip/Vehicles/Furnishings
0
0
9,270
0
0
9,270
Total
0
0
9,270
0
0
9,270
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
0
0
7,270
0
0
7,270
Trade -In Value
0
0
2,000
0
0
2,000
Total
0
0
9,270
0
0
9,270
67
Produced Using Plan -It CIP Software Page 62 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 30-Eqp-001
Project Name Replace Hotsy Pressure Washer #470
Total Project $5,150 Department
Cost
Type Equipment Category
Priority 4 Less Important Status
TCAAP No
Justification
Fleet CEP Points Replacement Guidelines Rating is 16.5 (Excellent condition)
Preventative maintenance and repair costs:
Expenditures
Equip/Vehicles/Furnishings
Total
Funding Sources
Equipment/Building Replacement Fund
Total
Equipment
Equipment: Public Works
Active
2026
2027
2028
2029
2030
Total
0
0
0
0
5,150
5,150
0
0
0
0
5,150
5,150
2026
2027
2028
2029
2030
Total
0
0
0
0
5,150
5,150
0
0
0
0
5,150
5,150
68
Produced Using Plan -It CIP Software Page 63 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 29-Eqp-001
Project Name Replace Snowblower 72" #468
Total Project
$8,240
Department
Equipment
Cost
Type
Equipment
Category
Equipment: Public Works
Priority
4 Less Important
Status
Active
Useful Life
10 years
TCAAP
No
Justification
Fleet CEP Points Replacement Guidelines Rating is 12 (Excellent condition)
Expenditures
Equip/Vehicles/Furnishings
Funding Sources
Equipment/Building Replacement Fund
2026
2027
2028
2029
2030
Total
0
0
0
8,240
0
8,240
Total 0
0
0
8,240
0
8,240
2026
2027
2028
2029
2030
Total
0
0
0
8,240
0
8,240
Total 0
0
0
8,240
0
8,240
69
Produced Using Plan -It CIP Software Page 64 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
26-Sew-001
Project Name
Sewer Lining/Rehabilitation
Total Project
$2,810,000
Department
Sanitary Sewer Department
Cost
Type
Maintenance
Category
Sanitary Sewer Maintenance
Priority
2 Very Important
Status
Active
Useful Life
40 years
TCAAP
No
Description
Sewer Lining and Rehabilitation of the sanitary sewer system on a 2-year cycle or when timing corresponds with the MCES I&I grant program.
(2027): Venus Avenue Neighborhood
(2029): Lift Station 2 Service Trail
(2031): Hamline Avenue, Eide Circle, Floral Park connection
(2033): Ingerson Neighborhood
Justification
As part of our sanitary sewer program, lines found with holes and cracks allowing for infiltration should be lined or repaired as needed. As the sewer infrastructure is aging,
staff will continue to perform sewer inspections and identify locations needing sewer lining and other sewer improvements.
Prior Expenditures 2026 2027 2028 2029 2030 Total Future
890,000 Construction/Maintenance 0 660,000 0 460,000 0 1,120,000 800,000
Total 0 660,000 0 460,000 0 1,120,000
Prior Funding Sources
2026
2027
2028
2029
2030
Total Future
890,000 Sanitary Sewer Utility Fund
0
660,000
0
205,000
0
865,000 800,000
Surface Water Mgmt Utility Funds
0
0
0
135,000
0
135,000
Ramsey County
0
0
0
60,000
0
60,000
Capital Improvement Funds (PIR)
0
0
0
60,000
0
60,000
Total 0
660,000
0
460,000
0
1,120,000
Budget Impact
This project will help the overall I&I reduction program.
70
Produced Using Plan -It CIP Software Page 65 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Park-009
Project Name Snelling Ave N. & Royal Hills Trail Improvements
Total Project
$450,000
Cost
Department
Parks Department
Category
Park Capital Improvements
Status
Active
Contact
Public Works Director
Type
Improvement
Priority
2 Very Important
Useful Life
30 years
Description
Construction of a new 1,800-feet in length, grade separated, 10-ft wide bituminous trail along the West side of Snelling Ave N. Royal Hills Park to Highway 96.
Justification
The new trail will improve safety and adequately accommodate pedestrians & bicyclists along the Snelling Ave. N. Corridor between Royal Hills Park and Highway 96. The
proposed trail improvements are in coordination with the North Heights Apartments Development Agreement.
Expenditures 2026 2027 2028 2029 2030 Total
Construction/Maintenance 450,000 0 0 0 0 450,000
Total 450,000 0 0 0 0 450,000
Funding Sources
2026
2027
2028
2029
2030
Total
Park Capital Fund (Park Dedication Fees)
450,000
0
0
0
0
450,000
Total 450,000
0
0
0
0
450,000
71
Produced Using Plan -It CIP Software Page 66 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-W-001
Project Name TCAAP New Booster Station
Total Project $1,500,000 Contact Public Works Director
Cost
Department Water Department Type Improvement
Category Utility Improvements Priority 2 Very Important
Status Active Useful Life 30 years
TCAAP Yes
Description
This item would construct an additional Water Booster Station near Old Highway 10 and 1-694 to pump water from the low pressure zone to the high pressure zone. The
booster station would be built on excess Ramsey County right of way and the structure would be made to look like a residential house due to its location.
SCADA upgrade and full system implementation to be included with this project.
Justification
The City's water system currently only has one booster station providing water to the high pressure zone through a single crossing of 1-694. If anything (lighting strike, wind
storm, etc.) knocked out the current booster station for any length on time the high pressure zone could be out of water after the half million gallon tower is drained.
Construction of a second booster station will provide needed redundancy in the system so if one booster station fails or is taken down for service the high pressure zone will
still be provided water.
The current Preliminary Design Report related to the TCAAP Spine Rd. indicates that the new water booster station should be constructed on the same timeline.
Expenditures
Construction/Maintenance
2026 2027 2028 2029 2030 Total
1,500,000 0 0 0 0 1,500,000
Total 1,500,000
0
0
0
0
1,500,000
Funding Sources 2026
2027
2028
2029
2030
Total
TCAAP -WAC/SAC Charges 1,500,000 0 0 0 0 1,500,000
Total 1,500,000 0 0 0 0 1,500,000
72
Produced Using Plan -It CIP Software Page 67 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
21-W-005
Project Name
TCAAP Trunk Water Improvements (Spine Road)
Total Project
$1,500,000
Department
Water Department
Cost
Type
Improvement
Category
Utility Improvements
Priority
3Important
Status
Active
Useful Life
30 years
TCAAP
Yes
Description
With the Ramsey County construction of the Spine Road, a TCAAP City trunk water main will also be installed. This will be funded via assessments or access charges.
Justification
In order to prepare the TCAAP site for development the City needs to extend trunk utilities into through the site with the construction of the Spine Road.
Expenditures
2026
2027
2028
2029
2030
Total
Construction/Maintenance
1,500,000
0
0
0
0
1,500,000
Total 1,500,000
0
0
0
0
1,500,000
Funding Sources
2026
2027
2028
2029
2030
Total
TCAAP -WAC/SAC Charges
1,500,000
0
0
0
0
1,500,000
Total 1,500,000
0
0
0
0
1,500,000
73
Produced Using Plan -It CIP Software Page 68 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 28-W-001
Project Name TCAAP Water Tower
Total Project $7,500,000 Contact Public Works Director
Cost
Department Water Department Type Improvement
Category Utility Improvements Priority 3 Important
Status Active Useful Life 30 years
TCAAP Yes
Description
Construct a new 0.75 million gallon water tower on the TCAAP site.
Justification
TCAAP will be served with water by expanding the City's current high pressure zone. Currently the high pressure zone only has a half million gallons of elevated storage.
This amount of storage is not sufficient to provide for domestic consumption and fire flow. The additional tower will provide the needed storage. A site for the tower will be
provided by Ramsey County on the TCAAP site.
The Rice Creek Commons Water Distribution System Modeling report dated January 24, 2025 indicates the TCAAP water tower should be operational at the time Phase 1 is
fully developed and occupied.
Design for plans and specifications of the water tower should begin 2-years prior to anticipated construction or at the time the City executes a RCC development agreement.
Expenditures 2026 2027 2028 2029 2030 Total
Construction/Maintenance
0
0
7,000,000
0
0
7,000,000
Planning/Design
500,000
0
0
0
0
500,000
Funding Sources
Total 500,000
2026
0
2027
7,0009000
2028
0
2029
0
2030
79500,000
Total
TCAAP -WAC/SAC Charges
500,000
0
7,000,000
0
0
7,500,000
Total 500,000
0
7,000,000
0
0
7,500,000
74
Produced Using Plan -It CIP Software Page 69 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-W-003
Project Name Trunk Water Main Condition Assessment
Total Project $40,000 Department Water Department
Cost
Type Unassigned Category Utility Maintenance
Priority 2 Very Important Status Active
Useful Life 10 years TCAAP No
Description
Evaluated the condition of 16" water main between North and South towers to determine the degree of corrosion and deterioration in 2020-2021. The evaluation will develop
a long-term plan for rehabilitation of this critical water main segment. Inspection via ultrasonic testing is needed to evaluate existing conditions in critical locations along the
Trunk Watermain.
2026 - Evaluation at Hamline Ave. N. near Ingerson and Dunlap St. N. near Ingerson
2028 - Inspections and testing at Dunlap St. N. near Grey Fox Road
Justification
The trunk water main extending between the north and south elevated storage tanks is one of the most important and critical segments of the water distribution system for
supplying water to the northern portion of the City. Segments of the water main have been in service for more than 52 years.
Expenditures 2026 2027 2028 2029 2030 Total
Construction/Maintenance 20,000
0
20,000
0
0
40,000
Total 20,000
Funding Sources 2026
0
2027
20,000
2028
0
2029
0
2030
40,000
Total
Water Utility Funds 20,000
0
20,000
0
0
40,000
Total 20,000
0
20,000
0
0
40,000
75
Produced Using Plan -It CIP Software Page 70 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-W-005
Project Name Trunk Water Main Improvements - Roseville
Total Project
$800,000
Cost
Department
Water Department
Category
Utility Improvements
Status
Active
TCAAP
Yes
Contact Public Works Director
Type Improvement
Priority 1 Urgent
Useful Life 60 years
Description
Proposed trunk watermain upgrade to 1,600 feet of existing 12-inch CIP to 16-inch DIP or PVC. Located within the City of Roseville along Hamline Avenue from Josephine
Road to Glenhill Road. These improvements will be in coordination with Ramsey County paving & trail construction project along Hamline Avenue. Meter pit and meter
improvements.
Justification
This upgrade is vital to support the future TCAAP development by allowing the future water tower to operate at appropriate water levels.
Expenditures 2026 2027 2028 2029 2030 Total
Construction/Maintenance 800,000 0 0 0 0 800,000
Total 800,000 0 0 0 0 800,000
Funding Sources
2026
2027
2028
2029
2030
Total
TCAAP -WAC/SAC Charges
800,000
0
0
0
0
800,000
Total 800,000
0
0
0
0
800,000
76
Produced Using Plan -It CIP Software Page 71 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-Eqp-003
Project Name Turf Fertilizer and Herbicide Sprayer
Total Project
$25,000
Contact
Public Works Director
Cost
Department
Equipment
Type
Equipment
Category
Park Capital Equipment
Priority
3 Important
Status
Active
Useful Life
20 years
Description
Purchase of new equipment to replace two Bobcat Toolcat attachments to maintain city turf property. Replacing 2 Bobcat Toolcat attachments that no longer function
properly.
Justification
The current Bobcat Toolcat attachments to fertilize and apply herbicide for weed control is not functioning properly. Public Works will need to rent equipment until the
replacements can be purchased.
Expenditures 2026 2027 2028 2029 2030 Total
Equip/Vehicles/Furnishings 25,000 0 0 0 0 25,000
Total 25,000 0 0 0 0 25,000
Funding Sources
2026
2027
2028
2029
2030
Total
Equipment/Building Replacement Fund
22,000
0
0
0
0
22,000
Trade -In Value
3,000
0
0
0
0
3,000
Total 25,000
0
0
0
0
25,000
77
Produced Using Plan -It CIP Software Page 72 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
26-W-006
Project Name
Water Meter Replacement
Total Project
$1,430,000
Contact
Public Works Director
Cost
Department
Water Department
Type
Improvement
Category
Utility Improvements
Priority
3 Important
Status
Active
Useful Life
25 years
TCAAP
No
Description
Commercial water meters were replaced in 1997. Residential water meters were replaced in 2000. Meter Readers were replaced in 2012. This is a placeholder for replacing
them throughout the City.
$30,000 budgeted in 2026 for consultant work.
Justification
Meters are at the end of their useful life.
If TCAAP begins to develop, a new metering system must be determined before meters are needed for properties within TCAAP. Highly recommended to begin the
consulting work in 2026 to prepare for future development.
Expenditures
2026
2027
2028
2029
2030
Total
Other
530,000
900,000
0
0
0
1,430,000
Total 530,000
900,000
0
0
0
1,430,000
Funding Sources
2026
2027
2028
2029
2030
Total
Water Utility Funds
530,000
900,000
0
0
0
1,430,000
Total 530,000
900,000
0
0
0
1,430,000
78
Produced Using Plan -It CIP Software Page 73 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project # 26-W-007
Project Name Water System Model Update
Total Project $42,750
Cost
Type Operational Maintenance
Priority 3Important
TCAAP No
Department Water Department
Category Utility Improvements
Status Active
Description
Conduct a Water System Model update.
Justification
The last water model was conducted in 2019. Since then upgrades have been made at critical locations of the water distribution system. An update is needed to show current
conditions.
Expenditures 2026 2027 2028 2029 2030 Total
Planning/Design 42,750 0 0 0 0 42,750
Total 42,750 0 0 0 0 42,750
Funding Sources
2026
2027
2028
2029
2030
Total
Water Utility Funds
42,750
0
0
0
0
42,750
Total 42,750
0
0
0
0
42,750
79
Produced Using Plan -It CIP Software Page 74 / 75
2026 thru 2030
Capital Improvement Plan
Arden Hllls, MN
Project #
26-W-004
Project Name
Water Tower Maintenance
Total Project
$3,028,000
Contact
Public Works Director
Cost
Department
Water Department
Type
Unassigned
Category
Utility Maintenance
Priority
2 Very Important
Status
Active
Useful Life
25 years
TCAAP
No
Description
2026 - North Water Tower order inspection report.
2027 - North Water Tower maintenance. Clean, inspect and repair tank interior of this 500,000 gallon storage facility in accordance with MN Department of Health guidelines.
2031 - South Water Tower order inspection report.
2032 - South Water Tower maintenance. Clean, inspect and repair tank interior of this 1 million gallon storage facility in accordance with MN Department of Health guidelines.
2033 - North Water Tower order inspection report.
2034 - North Water Tower maintenance. Clean, inspect and repair tank interior of this 500,000 gallon storage facility in accordance with MN Department of Health guidelines.
2038 - South Water Tower Full Rehabilitation
Listed costs are estimates only. Inspections will determine the extent of minor repairs required.
Justification
The MN Department of Health recommends that storage facilities for public water supply systems are inspected and maintained on a 5-year cycle.
Last full rehabilitation project on South Tower was completed in 2013 ($816,256). Next one due in 2038.
Last full rehabilitation project on North Tower was completed in 2018 ($608,125). Next one due in 2043.
Expenditures 2026 2027 2028 2029 2030 Total Future
Construction/Maintenance 12,000 375,000 0 0 0 387,000 2,641,000
Total 12.000 375.000 0 0 0 387.000
Funding Sources
2026
2027
2028
2029
2030
Total Future
Water Utility Funds
12,000
375,000
0
0
0
387,000 2,641,000
Total 12,000
375,000
0
0
0
387,000
80
Produced Using Plan -It CIP Software Page 75 / 75
2026 through 2030
Capital Improvement Plan
Arden Hllls, MN
Funding Source Summary
Source
2026
2027
2028
2029
2030
Total
TCAAP -WAC/SAC Charges
4,300,000
7,000,000
11,300,000
Capital Improvement Funds (PIR)
1,636,725
2,631,725
1,585,225
722,725
1,470,000
8,046,400
Water Utility Funds
1,124,750
1,475,000
1,149,500
1,025,000
4,774,250
Other
930,000
265,800
2,344,050
266,800
2,569,300
6,375,950
Surface Water Mgmt Utility Funds
500,000
1,410,000
135,000
160,000
2,205,000
Park Capital Fund (Park Dedication Fees)
450,000
450,000
Public Safety Capital Fund
399,674
301,363
202,416
53,171
115,174
1,071,798
Sanitary Sewer Utility Fund
390,000
865,000
620,000
505,067
199,000
2,579,067
Equipment/Building Replacement Fund
370,500
1,094,975
298,120
361,119
907,822
3,032,536
EDA General Fund
180,000
130,000
310,000
Ramsey County
80,000
1,317,500
247,500
1,645,000
Trade -In Value
39,500
108,000
83,500
52,500
44,000
327,500
Grants
2,000,000
2,000,000
State Aid
GRAND TOTAL
10,401,149
10,189,363
480,000
15,172,811
1,800,000
4,143,882
880,000
7,370,296
3,160,000
47,277,501
2026 through 2030
Capital Improvement Plan
Arden Hllls, MN
Projects By Funding Source
Source Project # Priority 2026 2027 2028 2029 2030 Total
Capital Improvement Funds
(PIR)
2026 PMP
26-Str-001
2 1,170,000
1,170,000
Hard Court & Trail Rehabilitation
26-Park-005
3 200,000
155,000
265,000
620,000
Lake Johanna Blvd Trail
28-Park-001
3 100,000
100,000
200,000
Hamline Avenue N Trail Connection
26-Park-001
3 80,000
80,000
Improvement
Arden Oaks Park ADA
26-Park-002
3 67,500
67,500
Improvements
Parks Master Plan
25-Park-007
2 10,000
10,000
10,000 10,000
10,000 50,000
GRG Floral Park NRMB
26-Park-006
5,225
5,225
5,225 5,225
20,900
GRG Hazelnut & Chatham NRMB
26-Park-007
4,000
4,000
8,000
Old Hwy 10 Trail - 96 to Valentine
27-Park-003
1,317,500
1,317,500
Park
Perry Park Improvements
27-Park-002
4
520,000
25,000
545,000
Playground Structure Replacement
27-Park-001
3
520,000
275,000
795,000
2028 PMP
28-Str-001
2
1,280,000
1,280,000
County Road E Trail Improvements
26-Park-003
3
187,500
187,500
Park Shelter Replacements
26-Park-008
4
185,000
185,000
Sewer Lining/Rehabilitation
26-Sew-001
2
60,000
60,000
2030 PMP
30-Str-001
2
1,230,000 1,230,000
Hockey Rink Board Rehabilitation
30-Park-001
4
230,000 230,000
Capital Improvement Funds (PIR) Total
1,636,725
2,631,725
1,585,225 722,725
1,470,000 8,046,400
EDA General Fund
Gateway Signs
25-EDA-001
180,000
130,000
310,000
EDA General Fund Total
180,000
130,000
0 0
0 310,000
Equipment/Building
Replacement Fund
Replace 2009 Sterling Acterra Truck
27-EgpV-001
3 144,500
139,135
283,635
#431
Replace 2018 Toro Large Area
26-Eqp-001
3 94,000
94,000
Mower #457
Replace 2016 F-350 wN-Plow and
26-EgpV-001
3 70,000
70,000
Liftgate #215
Turf Fertilizer and Herbicide
26-Eqp-003
3 22,000
22,000
Sprayer
Replace 1996 Redi-Haul Trailer #108
26-Eqp-002
3 16,500
16,500
Pipeline Inspection Push Camera
26-Eqp-004
3 12,000
12,000
System
Auto Greaser Installation for asset
26-Eqp-005
3 11,500
11,500
85135
Replace 1993 Case 621 Loader #103
25-Eqp-001
275,000
275,000
Replace 2000 Backhoe #204
27-Eqp-002
3
157,010
157,010
^--'--- -- R --1-
Source
Project # Priority
2026 2027
2028 2029
2030
Total
Replace 2015 Ford F-450
Plow/Dump Truck #320
27-EgpV-003
2 120,000
120,000
City Hall Elevator
27-BLDG-001
4 103,507
103,507
Replace 2016 F-350 Pickup
w/Liftgate #455
27-EgpV-002
4 74,975
74,975
Replace 2013 Ford Escape #504
26-EgpV-003
33,500
33,500
City Hall Furnishings
27-BLDG-002
4 21,342
21,342
City Hall Security System
27-BLDG-003
4 16,006
16,006
Replace 2016 Stepp Asphalt Patch
Trailer#121
28-Eqp-004
3
52,250
52,250
Replace 1998 Tow Behind Air
28-Eqp-003
3
34,550
34,550
Compressor #107
Replace 2019 Ford F-150 Ext Cab
28-EgpV-002
3
31,350
31,350
#601
Replace Bobcat Snowblower 84"
28-Eqp-001
3
7,270
7,270
#118
Replace 2019 Ford F350 Crew Cab
29-EgpV-002
4
77,250
77,250
w/Tommygate #85323
Emergency Generator Replacement
27-Eqp-004
2
77,068
77,068
Schedule
Air Handler/HVAC Maintenance
29-BLDG-001
5
59,781
59,781
Replace 2023 Bobcat Toolcat
29-Eqp-004
2
47,100
47,100
#85478
Replace 2012 Workman #445
29-Eqp-003
3
36,050
36,050
Replace 2019 Ford F-150 #602
29-EgpV-001
3
31,350
31,350
Replace 2019 Bobcat Miller/Planer
29-Eqp-002
3
16,480
16,480
#129
Replace Snowblower 72" #468
29-Eqp-001
4
8,240
8,240
Replace 2009 Husqavarna
28-Eqp-002
3
7,800
7,800
Pavement Saw #113
City Hall Roof
30-BLDG-001
3
410,278
410,278
City Hall Entrance Canopy &
30-BLDG-002
4
102,604
102,604
Masonry Replacements
Replace 2022 Ford F-250 w/Service
Body
30-EgpV-004
3
82,400
82,400
Replace 2022 Ford F-350 w/Plow &
30-EgpV-003
4
82,400
82,400
Tommygate
Replace 2025 Bobcat Toolcat
30-Eqp-004
3
50,000
50,000
Replace 2020 Ford F-150 #603
30-EgpV-002
3
46,350
46,350
Replace 2018 Ford Escape #505
30-EgpV-001
41,200
41,200
Replace 2016 Workman #456
30-Eqp-002
3
36,050
36,050
Replace 2 Toro Zero Turn Mowers
30-Eqp-005
3
28,000
28,000
Asset 85485, 85486
Replace Bobcat Rotary Brushcutter
30-Eqp-003
2
15,450
15,450
#440
Concrete Flatwork, Partial
30-BLDG-003
5
7,940
7,940
Replace Hotsy Pressure Washer
30-Eqp-001
4
5,150
5,150
#470
Equipment/Building Replacement Fund Total
370,500 1,094,975
298,120 361,119
907,822
3,032,536
Grants
Old Hwy 10 Trail - 96 to Valentine
27-park-003
2,000,000
2,000,000
Park
Grants Total
0 2,000,000
0 0
0
2,000,000
Source Project # Priority 2026 2027 2028 2029 2030 Total
Other
2026 PMP 26-Str-001 2 930,000 930,000
Lake Johanna Fire Dept Fire Station 27-Pub-005 265,800 269,050 266,800 269,300 1,070,950
2028 PMP 28-Str-001 2 2,075,000 2,075,000
2030 PMP 30-Str-001 2 2,300,000 2,300,000
Other Total 930,000 265,800 2,344,050 266,800 2,569,300 6,375,950
Park Capital Fund (Park
Dedication Fees)
Snelling Ave N. & Royal Hills Trail
26-Park-009
2 450,000
450,000
Improvements
Park Capital Fund (Park Dedication Fees) Total
450,000
0
0
0
0
450,000
Public Safety Capital Fund
LJFD General Equipment
26-Pub-003
203,254
56,631
16,415
53,171
7,570
337,041
LJFD Engine/Ladder Replacement
27-Pub-001
145,180
150,060
295,240
LJFD Rescue/Command/Utility
27-Pub-002
51,240
29,280
112,801
107,604
300,925
Vehicle Replacement
LJFD Station Capital
26-Pub-004
0
65,392
73,200
0
0
138,592
Public Safety
Capital Fund Total
399,674
301,363
202,416
53,171
115,174
1,071,798
Ramsey County
Hamline Avenue N Trail Connection
26-Park-001
3 80,000
80,000
Improvement
Old Hwy 10 Trail - 96 to Valentine
27-Park-003
1,317,500
1,317,500
Park
County Road E Trail Improvements
26-Park-003
3
187,500
187,500
Sewer Lining/Rehabilitation
26-Sew-001
2
60,000
60,000
Ramsey County Total
80,000
1,317,500
0
247,500
0
1,645,000
Sanitary Sewer Utility Fund
2026 PMP
26-Str-001
2 200,000
200,000
Lift Station Rehabilitation
26-Sew-002
2 190,000
60,000
223,000
24,000
497,000
Sewer Lining/Rehabilitation
26-Sew-001
2
660,000
205,000
865,000
Emergency Generator Replacement 27-Eqp-004 2 145,000 77,067 222,067
Schedule
2028 PMP 28-Str-001 2 620,000 620,000
2030 PMP 30-Str-001 2 175,000 175,000
Sanitary Sewer Utility Fund Total 390,000 865,000 620,000 505,067 199,000 2,579,067
State Aid
2028 PMP 28-Str-001 2 480,000 480,000
Lake Johanna Blvd Trail 28-Park-001 3 1,800,000 1,800,000
2030 PMP 30-Str-001 2 880,000 880,000
State Aid Total 0 0 480,000 1,800,000 880,000 3,160,000
Source Project # Priority 2026 2027 2028 2029 2030 Total
Surface Water Mgmt Utility
Funds
2026 PMP
26-Str-001
2 500,000
500,000
2028 PMP
28-Str-001
2
1,410,000 1,410,000
Sewer Lining/Rehabilitation
26-Sew-001
2
135,000 135,000
2030 PMP
30-Str-001
2
160,000 160,000
Surface Water Mgmt Utility Funds Total
500,000
0 1,410,000 135,000 160,000 2,205,000
TCAAP -WAC/SAC Charges
TCAAP Trunk Water Improvements
21-W-005
3 1,500,000
1,500,000
(Spine Road)
TCAAP New Booster Station
26-W-001 2
1,500,000
1,500,000
Trunk Water Main Improvements -
26-W-005 1
800,000
800,000
Roseville
TCAAP Water Tower
28-W-001 3
500,000 7,000,000
7,500,000
TCAAP -WAC/SAC Charges Total
4,300,000 0 7,000,000
0 0 11,300,000
Trade -In Value
Replace 2018 Toro Large Area
26-Eqp-001 3
20,000
20,000
Mower #457
Replace 2016 F-350 wN-Plow and
Liftgate #215
26-EgpV-001
3
15,000
15,000
Turf Fertilizer and Herbicide
26-Eqp-003
3
3,000
3,000
Sprayer
Replace 1996 Redi-Haul Trailer #108
26-Eqp-002
3
1,500
1,500
Replace 1993 Case 621 Loader #103
25-Eqp-001
25,000
25,000
Replace 2015 Ford F-450
Plow/Dump Truck #320
27-EgpV-003
2
25,000
25,000
Replace 2009 Sterling Acterra Truck
27-EgpV-001
3
20,000
20,000
#431
Replace 2000 Backhoe #204
27-Eqp-002
3
15,000
15,000
Replace 2016 F-350 Pickup
w/Liftgate #455
27-EgpV-002
4
10,000
10,000
Replace 2013 Ford Escape #504
26-EgpV-003
8,000
8,000
Emergency Generator Replacement
Schedule
27-Eqp-004
2
5,000
5,000
5,000
15,000
Replace 2017 Mack
Plow/Wing/Dump Truck #123
28-EgpV-001
5
35,000
35,000
Replace 2016 Stepp Asphalt Patch
Trailer#121
28-Eqp-004
3
25,000
25,000
Replace 2019 Ford F-150 Ext Cab
#601
28-EgpV-002
3
15,000
15,000
Replace Bobcat Snowblower 84"
28-Eqp-001
3
2,000
2,000
#118
Replace 1998 Tow Behind Air
28-Eqp-003
3
1,500
1,500
Compressor #107
Replace 2023 Bobcat Toolcat
29-Eqp-004
2
30,000
30,000
#85478
Replace 2019 Ford F-150 #602
29-EgpV-001
3
15,000
15,000
Replace 2009 Husqavarna
Pavement Saw #113
28-Eqp-002
3
2,500
2,500
Replace 2025 Bobcat Toolcat
30-Eqp-004
3
30,000 30,000
Replace 2 Toro Zero Turn Mowers
Asset 85485, 85486
30-Eqp-005
3
14,000 14,000
Source Project # Priority 2026 2027 2028 2029 2030 Total
Water Utility Funds
Water Meter Replacement
26-W-006
3 530,000
900,000
1,430,000
2026 PMP
26-Str-001
2 500,000
500,000
Water System Model Update
26-W-007
3 42,750
42,750
Lake Johanna Blvd Watermain
26-W-002
3 20,000
500,000
520,000
Assessment
Trunk Water Main Condition
26-W-003
2 20,000
20,000
40,000
Assessment
Water Tower Maintenance
26-W-004
2 12,000
375,000
387,000
Booster Station Improvements
27-W-001
2
200,000
200,000
2028 PMP
28-Str-001
2
480,000
480,000
Emergency Generator Replacement
27-Eqp-004
2
149,500
149,500
Schedule
2030 PMP
30-Str-001
2
1,025,000 1,025,000
Water Utility Funds Total
1,124,750
1,475,000
1,149,500
0 1,025,000 4,774,250
GRAND TOTAL
10,401,149
10,189,363
15,172,811
4,143,882 7,370296 47,277,501
f(C
O T O h N
O
O
N N
O^ O N L6
M
M
e
M
V t�h N
`'
N W
O
N
r
N
N N1.
l
IN
w ry
p
O O O O O
O O
O
O O
O O h O ^
O O
p
N cc
V
M
M
N
h
M
^
NIm
w n
N O O> O
O
C
N
O h N Y01 V
^
M OD
Mq
O
crj
N
c6
w ry
o
oMow o "�
o0
o
n
rn
m
c
o
ri �n
z.. b
O
`
tp0
ci w ry
N
N
N
O O O
T�Q
O' I
0 0. O
O 1
C
7 O
jam]
a
N
W h N O A
O
O
O!
O
N
O
N
V
o O b 0
C C
O
p
N' O' N' O" 0
O' O'
O
p N ry
NM
w
T
M
W b N ^M YOf G
hcs
p
m N w
O
c
M
c
M M `� O r
r CDAl
O
N
�
N
e�Y
p
��
V
fp
O V O h o O
O
N 0
N
N
M
O h N � r
a
O T
�.
O
N
N
o
o>
N
�N...
v
N
ry
7
N l) O h O N
a
N
N
N
r I w
r Ili
W
OO
N Ili
e
N
tr0
c
r Calf
N
00
O
w
O O O Ot O O 0 0 N
h 0
N
N w n
h
N
O h O h 0 0 h 0 H
n 0
pOp y
� o
N
M
M
M
.N_.
V`
Nsuoill!uy
�I
a
c
y
p
o
@ Z
:&
a
O5�
LL
5
W
C
O
y m
m O
'o y
y
Q. 0
7
J
c
C
o =
a~
�••I
v£ Q
vi E LL
O
3 a
i�l
a ,�y„ W
a L
~ O
m 7
•
O R U
0 N
C
C
V
L C V ««
V 7
y
m E
Y}y
y O
o
C
L y« c7 d a a
Q .. (7 m C
m m
y
m
N N
m
9 a O p z d
C
m
>
O'
m
O O"K a
W
m mC
y m y U U a N O J
C
coi
m
Q y
> d
C
ro
a
LL' d y J J J U- d H F w
r
c� w`
I-
00
O
0
N
O
o
M
CO R
O
D
N
n
O
N
W
O
N 0 14
e
1.
N
4
O
N
N
O
A
o
(9)
01
O
O M O of
O
r
O O' tV
P
O'
o
N
O M M
,5
N'
O
N
N O N
O"
o
N
M M
GD
�
�p
OJ O
O
O
N
o
OJ
r
M c`
A
N
N
o
M C N
n
N
N
N
b O
O
O
W
rn
�
V
�O
o 0 o rn o 0
0
0
N
r
n h m
N
M
O
O0i
fti
^
�}
r
M
U)
a
co Z
O R LL
C LL LL
C; c O
,
m y y
O �
c a
a
Q fn
`0 a w
U
U m0
O
N
Lo
O
N
M
W
O
M
a
N
N
N
O
M
M
N
N
01
a0
N
Ol
O
N
N
W
O
M
N
N
l`7
oo
0
M
M
O O
C N
O N
N N
M
N
7 y
a U
C M
A R
A
L m
3 C U
C LL R
a m
w . C
C
m a
Q L C
H U W
O O O O O O O
SOOHIN
N
N
N
N
U)
0
R Z
O R LL
C LL LL
C; c O
,
m y y
O m
c a
-2 4
Q R fn
`o a W
U
U m
O
O
O
a
O
M
O
O
O O
p
G C
C MO
F
O
O
O
co M
N
O
CD O
O
OO OJ
R O
N O
O M
O
M M
1� �
W
M O
O O
O O
N
O O
O O N
N N
ao
p
O O h
N
ci
O ci C
O CO
IO
N
O
M M
M
cD O
O
O
N p
O O R
7 V
O
7 O
O
O O M
O
M M
N
O
W N
N
U
0
_
7
O
N
i
3
�
F
C
y
Li
m
a
to
L y
V
U
LL
y
o
N
R
�
R
y
O
N
R
L
CO
R
R C
UJ p W
7 N y N
'O
3 C
c N
g�
cm y
U O E
N j W
> .. iq
N
O.
O (ay
pp
•C O
— ` >
c6
W
O7 >
R '6
m K
w
U F F
N
H W UR 0
H
0 W
0 0 0
spuesnoyl H N
m
M
N
cli
N
M
O
N
N
N
00
N
N
N
U)
a
R Z
C LL LL
c c O
,
m y y
O m
c a
ga
-6
Q R y
`o a W
U
U m
O
N
M O O
f0
Oi O
o N N
O
O
O Opi O O
r
O N Lo I O
O
O O O O
O O
� o K o
0 O
O
N ,
O O O
M O O
o O M N
O M
O
O O O
O O O O
0
O
O
O O O
o v o
O
0
O
O O 14 O
O
O
O
N O O O
O O O O
aD
o M N
O cN0
0
O
w O O O
O O O
M
N O n O
O
N
(D
O
C-4
O
u-i
N
r
M
r
N
ID
O
M
N
O
r
M
M
A
r
rn
O
O
.M..
c0
c0
N
O
spuesnoyl
O
CF)
M
N
O
N
0
N
0
N
0
N
fq
0
Co Z
C d LL
C O
E Lu
m y
o
a o
-6
Q 0 7a y . W
Q
U
U 0
O
(n
o m o 0
OD
tcl o o
N N O N
N
�.j N
O O O O O
M O ' O M
O
ON' M M
O
� U9
M N
O O O O M
N M P
N a N V p
M N
M LL'1
r N
o
f7 N
fb
v
M �
M N C`O h
m
fo O O o 0
U) V
r N R h
j� N
CO �
O O O O O
O �
N N C`� M
O o U) 7 7
N
O N
co 0) N o
N o V M
O N
06
O O T
o
N C, V � N M
O V M
0
0
� O
M^ O O M N
O O` L N
� N
o
fy ^ O O O 2 cm,M
f17 N O O U)
O O "c M N
r N
O
O N O
c N
O �-
T ^ M R O
oco
O ro t,: ` h
M M ` N
0
O O O N O
N COD ' O h ' N M
l`7 co
N Lo M m
to M N
fA
OO O O N O Nh
O coR O
O O M
fo `-
0 0^ N O O
O N 2 O) OO �O O
O O O N <p M
O of cp ui uS uS
N
U) M
co
N O O N
r Nw Lo
U M
n
7t o
to N
C M
W to
fo (D
r M
O fLO
fOo O
O N
O O
o rn
N I�
O N
O N
r N
r N
co co
fco It
ro N
O W
r N
N n
M M
fo O
N h
c
fro M
M M
w
N
ci
fwf
co
co
M
N
a)
cc
Lq
coto
N
Ln
ON1
N
Go
co
fo
Lq
N
O
Ln
N
N
rn
0 0
v
�
CO P
fD
N
�
0
co
O �
N
COO R
^
O _
r
Ol
O V
a
�
f1Y
P
r
r
OOi V
A
p V
N
to
Lo
o
n
M
ui
cc
eo R
O�
� ^
O
a
n
en
N O
O
f1Y
o
N ry
a
N W
G ry N
COo M
f0
O
N
O^
cD
Go
o rn
0
N n
O n
� n
N
N
co
h c
d
W U N U
7 ] a C')
2W d a�i LL
o I O y
7 C o
N
N LL? N i LU
NN
LL L p N@ O fn V) a C Co a) LL
U.
rr t f6 V E
16 c O fro v 0 a m 4) c
4) 0O m
OD li N 7 C N o O C3 N r f6 LL N f0
N ~ W N C 0 ?i K m N CO m
C C@ N L N tm
C W W U' 0) w Z W OI C ,C , C
fD N L 0@ X 0 LL LL LL LLd LL LL 0 L N L " L C c C
m 0' U � LL F - W J J J J H J H U W LL U W
SUO!11! J
f3A
M
N
O
N
O
N
O
N
N
N
O
N
m
0
Co Z
C d LL
c C 0
E /n
m m rn
o
D
c Qo
-6
Q 0 7a (n . W
Q
" U
U m0
Q
O
O OI 1
to i
o ai
I+i 1
O 1
� � 1
Ib V
o M C6 1
Nj 1
N r 1
N p i
OD N 1
N
o ci
� 1
O 1
M
JJJJJ. N
e
O r (h 1
M 1
M � 1
7 1
N
N O 1
c O
N
ri cn ^ 1
V I
r '
r N 1
O N Ci
t+>
cq
O j
M O 1
e O
O N C6 1
M 1
V N 00 1
M (ti N' ;
R
e
O.
O M N ;
Hl
a O O 1
O O
N' ;
C/
N NW O j
M ,
Y'i h 1
. Ui h I
O M N I
of 1
O
V N
i
i
O
N
OOi
O
O O
O
10 O
) O
O
N O
i
i
O
O
j O
p i i
i OI O
J
...
O
^ ri M Iri
O (o
i N `
co
cq
)
O
N O
i i i i
i p i i i
N
h fp O
1
c N
D
J
O O O
O cO
O
1jlo
N
O
J
J p
oi U O
O
c
O
O N' <p
N
r o
N r
r
N V
O Ln
CND r
r
M
O r
O W
M
N oo
M (O
co N
r v
M
N
r O
m N
N N
11( N
01 II)
N o)
01 N N
N
O V
L
M
� O
M O
O �
O
f")
O W
a m
� N
Mv
N Lo
r
Oi M
M �
N N
.N...
/M
r
o
M
O
7
M
M
GO
cli
co
co
N
N
N
r
q
N
O
N
r
N
M
to
F-
M
r
O
O
ID
M
10
M
o
^'
W
O
In
O
N
SUO1111 (I11J
d
V
n
O
d
y
o
`
O
3
+ +
U)
LL
LL
N +
C
N
to
(D
U
IL
L
O
C
c 0
O.
N
'6
�n o N
W
'a R
N N
C 0
f6
..�_.. 1)
- m
N O
d
10 m
m
C+ a
@
C
N
d
d L
C J1
N
N C
3
U
C
L
N
+
Q U
x N L.
m @
0C
O
7
d
d L
U' � W
J)
J1 X
N
N LL
L)
M
y E (0 N
_c ai
rn=
m
c a a a a a a
rn rn
X
A
00
E
c
t
C'
ru 0 :5 m m m m m md
c c
LLl d
p>
>
o e\°\° 0 0
ZT 7•
�aaaaaa
c
Eop
m K 00 (7
F
W J U) N N N N N N
0 0 0
F U
W
rG
N
0
N
M
O
N
O
N
CD
O
N
N
N
fN
0
R Z
C LL LL
c c O
,
m y y
O m
c a
ga
Q R (n
`o a w
U
U m
O
N
O
C
m
v
o
��
O
N
W O
�
V O
M n
O
N
U7
O
p
O
N O
M
M
O
O n
p
O
M O
N
ci
m
O
O
O O
M
oo
O
N
`-
p
O
R O
r.
M
a n
to p
n
0
N �
o
05
O
O
M O
O O
O O
N
N
O
N
cli
oo
n
r
m
n
q
N
cli
M
O
rn
O
V
to
o
cli
M
7
O
C)
SUOI11IW
N
U
°
u
u
0
O
O
°
o
3
O
C
L
m
+ +
LL
Z
Cc O
N N +
C
G7
N
U)
3
s
w
N
C
m 44
s
C O
R
O
c
N
C
Ca
m
m
C+
f0
O
y
y n
c
U
s
a
a'
7
7
c
M in
m C>
N
3
n Q
w
UI
y
(a
CMm
a
°
d
w
a a a a a a
W
CL
m
o
o
aaaaaa
o
K
c_
O7 >
��
O
_
R
@
V (O W O N V �'
@ w
N
R
c
R
'O
c
N N N O
O F
H
U
W
rL
M
M
N
M
N
N
M
N
N
N
N
N
0
Co Z
C d LL
c C O
E /n
n m rn
o
D
c Qo
Q 0 7a V7 . W
Q
" U
U m0
O
(n
1 . .
. . .
. . . . . . . . i
Ng O
1
h 1
Z 1
1
1
O O
OI O
O N
O
R
1
M
�i
1
O O
0 0
N
O
cl O
O 1
1
I
` rn
l0
i p i
c
1
'o W O
W 1
1
lo O O
n 0 O
c 0 c
1
1
` pi N.
N. co
(V
�
14
cli
to
R
7
co
C
0
O
T
n
O
N
O)
N
N
O
w
M
M
N
M
O
M
r
N
SOOIllI W
W
V
0
to
N
C
m E
0
U)
c
LL
m
Q 0
A
+ +
y N+
C 4
N
3
LL
L
E 'M-'
c -10o E aci
>>
U
N
C
a
m `o
c m E 7> d
c 10
m
m o 'm
0
o 1) a`J d a=
8
o
c
rn a�
N
to m
Co
e+
@
N C
7
cS n E W
m 1U JJ 2'
n
N�
y c
N
v
C
s
N
y`+ c10i
co 10
m
N
0
m (ifC
i� C O U
X W
LL
m
].
N
0
"�O
d
y
c
V
0 Ip co
LL a LL CL IL CL d n`
z rn a
%
m
E
d EL a. 0 3 cn aJ
c
0 c w
w
rn
o e o 0
Fo
N
o,LLCLILCL ,J`;
d d d NO 07
N N N M M M Y C
a7
a N.
.6 10
c
"O
N N
O.
O
E > > >
N N N N N N J O
0 O
0
W
W F>>> m
F-
F
It
1)
p
LM
M
O
N
M
O
N
M
M
O
N
N
M
O
N
W
EM
�
L
O
N
CL
Ln
a �
�, Q
O
N
i,
MM
N
W
OQ
E N
>
o
o = Q
N
O
i
N
a -
Q O
co
o
txo
N
N
LL
I
N
O
i NI
C
GCJ
G
Ln
rl
Ln
o,
0 0 0 0 0 0
C 0 0 0 0 C
0m0 v0i 0 0 0 Om
V V vi ui vi m
0 0 0 0 0 0
C 0 C 0 C 0
0 o 0 0 0 Ln
N r- 0 n 0 V
N N
C 0 C 0 C 0
N n - O ^ 0000
N
000 0 C 0
c 0 C o 0 o
00 N c a � lN0 V
N
C 0 C 0 0
n m o 0 0
� O� VI ll1 N
a
3
u
LO
m
a
U
�qm
(4400
N
O
N
z
w Ln
0 N
oC O
Q C-I
1
OO
�N
ryll
W w
co
z �
LLJ w
w >
ry- O
n z
O
�J
Ln
Ln
N
O
O
N
M
00
N
N
M
N
�=
CL
t
N
U"
O
V
Ln
Ln
00
O
v
N
W
U
N
..
0
O
0
(V, l
T
Ln
ru
U
LL
O
Ln
^O
W
LL
Ln
U
f�
L
Li-.
aj
N
X
LU LL
n U
� N
E
O v
v
• cn O
O !Eno E
N
v
U —
N
v O -
>� _ -
> p I v
N N
N E �
N }'
c6 LnU
M '
— U
.� .� O
Q 0
rn
rnN I
-
v ra
o N
ru
� J
U.)
W i W c
�
Ov C O
m -o .0 E
_0 ca
cn
O CAA o �
Q C6 C C:O
4- v O
C6 U
CL
O
U D D-
U . 0 0
\
\
\
\
\
\
\
\
\
\
\
\
\
\
\ \
\
\
\
\
\
\
*' a1
O
O
u")
Ln
M
O
tD
V'1
O
O
M
to
O
n Ln
O
O
Ln
O
Cl
Cl
a1
O
CD
I-
O�
V
Ol
O
N
m
1*
a',
O
Il
V c-I
rI
01
LD
Il
Na)
U
N
M
O
rI
rl
rI I
rI
"I
LD
t
Ol
N
a U
+
O1
M
A
N
rI
I�
O
O
Ln
O
O
I,
N
m O
N
N
I,
Ln
O
m l0
a1
zzj-
zt
N
I,
O
N
LD
O
zzj-
Ln
O
m
O
r-I m
L.0
to
O
m
m
N 00
On
Ln
N
I,
l0
M
M
M
O
M
r-I
O
M
O
rI I,
Ln
lD
N
01
Lo
N c-I
Ln
Lr
c-I
ci
Ln
r-
r-
n
O
zF
n
O
00
LD
V O
n
O
O
M
LD
O N
00 N
Ln
00
Ln
LD
lD
rI
Ln
Ln
Ln
Ln
0)
lzt
N LD
N
LT
r-I
Ln
I�
Ol LT
_ O
td N
Ol
Ln
Ln
m
Ln
I,
Ln
r-I
LD
m
Ol
1p
I,
rl
r-IOl
M
O
rl
V
N
Ol
00
LD
Ol Ol
00 r
H
L4
t/T
in-
U/ V).
++
rl
Z*
r-I
N
I,
Ln
Rzt
O
00
O
O
01
Ln
Ln Rzt
M
Q>
01
N
O
N M
a1
Ln
Il
'zT
O
r-I
O1
N
O
00
I,
O
l0
OO
Ln N
LD
M
':I-
lO
n
Ln 00
bD
N
to
lD
O
Ln
M
N
O
LD
O
O
O1
ci
LD ci
r"
ci
rl
N
Ln
lzl
O L O
00
00
I,
T
00
V1
zl-
O
LD
I,
O
O
00
V L O
O
Ol
m
00
L O
Il L.O
00 N
Itil
M
n
Ln
al
ci
N
Ln
Rt
n
O
M
Lo
00 -Zi-
V
00
r-I
N
al
Lo M
_ O
LU Nrl
rI
Ln
LD
Ln
I,
01
Ln
l0
M
O
00
rl
Ln LT
M
r-I
rl
N
CD
-ze
M
00
lO
00 Ln
O
a
O
N
N
H
t/}
tn•
to
a1
u
i
i
i
i
1 i
i
0
O
i
O
'
l^il
LLri Lr
I.0
n
O1
LO ci
t0 7
-.0t
LD
LD
tD
� LL
i/T
O
O
Itt
Ln
N
O
N
N N
rI
Ln
Ln
rl
M
I,
N
N rl
QLn
LD
Ln
O
zT
N
co
N Ln
O
O
V
c-I
LI1
M
fM N
+ LL
O
r,
n
N
N
W
u
CD
O
O
0
r-I
CT)
O
O
CD
O
CD
O
01
lT
lT M
a1
O
O
Ln
V1
O
O
O
O
'
rI
1
c-I 01
0
N
In
r-I
N
r-I
1.0
O
N
M
M
o
00
a
m
Ln
mm
m
r-I
r-I
c
tDD
@ LL
ri
m
m
L1
Ld
,O
�O
�O
v
O
O
Ol
Ol 01
D
O
O
m
O
O
rn
to
rI
.
I� n
a>i -a
o
o
0Q10
m
or E:
ci
ci
N
c-I
N
— 7
t_a LL
U
a1
�
N
th
t/1•
i/)•
i/) N
�
r,
N
O1
N
O
O
00
Ln
N
m
O
O
Ln
m
I,
n
n
m Ln
N
O
M
N
�
m Ln N
LD
O
00
N
j
N
Ln
Cl
N
N
O
M
O
N
t9 c-I
n
O
O
LL
l0'
ri
00
Vj
O
-til
O
M
O
00
V l0
O
O
O
O
N
rl
-t
Ln
LD
r-I
I,
V
N
m
r-I
0)
r-I
I,
N -;t
Ln O1
-Zt
rI
O
r-I
01
Kt
u�
(n LU
W U
Vt z
z Q
W J
0_ Q
m
W
LU
W z
V)
cl� D
LL
Q
y
c
an
4
V)
LU
LU
c
aJ
E
O
�_ z
(1
U
O
Z)
w
aJ
O
Q
7
p V)
N
a1
i
Vf
E
U
LUL%
C
a1
-0
a1
LU ('J
a1
"O
E
�^
a1
i
W
O
v
aJ
t0
O
'L
z
V)
c0
�+
E
V1
C
C
a1
`�
+-'
O
O'
lY
D
>O
T
+-' Y
U
�.+
LL
X
W Q
W
V1
W
i
x
+'
O
O
a1
V)
.0
i
~
(D
O
K
'v
O
Q V
3
N
U
vl
a1
O
a1
�O
02S
E
2
j
aJ
Q
H
0
t0
V)
Co
E
—
.D
<0
H H
W
a
t
c
w
bn
v
O
z
`—' `—'
O:
o
E
O "'
41
x
f6
aai
Cl
a1
a1
(a
N
a1
U
u
W
D_
a`1
C
H Z
W
o
H
O
Ln
u+
L
c>
c—^
c
+'
i
aW
D
m
O
m
c
U
=
J
U
m
�
~
W
U
LL LL
LL
W
U
W
N
a
Ln
D
(D
N
O
N
v IR
O
N
N
a)
N
Q
X
LU
Q)
C
C
O
aJ
a
■
■
0
ai
x
H
■
■
N
a)
O
W
VI
v
c
iz
■
■
N
O
C
f9
v
V
■
do
c
.E
L
v
c
a,
E
Ln
v
C
■
■
■
C
■
■
u
V)
co
lD
N
O
N
O
Ln
N
O
E
O
L
00
O
M
C1A
.N
c6
L
U
�D (U
N z3
O a
N
4�
u) a)
ai
� -0
N =3
m
N
u
H
LL
V)
N
O
N
c�
v
J
N
Qj
n3
v 4-
E 4-
4- co
U, a-
N
Q o
Q �
p U
V
o Z5
m a
rl 00 N 00
fV r, N
rl 00 N 00
N r, N
lD N � Lri
m
fV P N ONO
l� N cN-I
aJ
C-
O
aj
c6
vA U
(A O
O
U �
Q1 �
O N
O
a U
cV
Ln
I
O L()
N
p
N N
0O
L
O
U� _0
tD
bz
m
c-
O U
L
L
N N
.E
L
W
L.L
C6
4
O
LL
cu
m
LO
t
N
V
O
N
0
L
00
LO
00
I`
M
It
O
00
O
I`
CD
�
't
O
C'M
O
O
0)
ti
0o
N
N
O
(D
00
>m
O
Lc)
CN
O
fi}
I`
N
0'
�
O
O
Lid
I`
I`
I`
LO
N
O
M
O
00
V)
,:I-
M
N
N
O
M
�
_
Cyi
O
O
�
CEO
N
LO
N
N
LO
m
60,
d)
O
O
Cfl
S
O
O
N
It
1:11
0)
O)
CO
O
00
Ln
N
LO
N
O
M
O
N
N
LO
=
;I-
mM
Ln
U
O
L
c
'E
X
N
�
O
w
cn
L
L
Q
O
L
i
N
L
to
J
S
U
E
5
- No
61%I
00
O
cn
qqT
60
O
4-
0
0
o +�
-0
Q c
4--1 Ln
C: N
=3 O
O N
m
+j
v �
cn . —
ca �
4A �
•� U
u ' Ln
U �
v �L
v
ca �
EO
V
N �
m
v =
E
Ln
vi
O
ca
U
N O
� r-I
N 4-,
L N
-0 M
N CL
_:
U +j
•— v
N >
O
4-J
U
>
� 'O
L
O
0
E
0
v
0o
Ln
N
O
v
O
O
O
N
N
O
E
ca
v
N
L
aJ
_=3
U
c
L
CL
X
W
LL
M
04- n
LO
N
� (DV N
0
t0 �
N =
m
N
O
N
so
co
(C)
(C)
LO
CY)
(D
(3)
I,--
LO
(D
r
d6
O
lqi
M
r
CC)
r
r
LO
LO
�
M
�
LO
N
CC)
LO
(C)
r
ti
00
";f
Cfl
O
r
00
;1-
ZT
I`
LO
d7
r
r C`7 r
{f}
N
O
O
00
O
r
d)
(fl
00
r
1`
LO
00
lq:f
O
ti
0)
N
(C)
N
LO
r
CY)
O
Cvj
0=
O
�
O
m
>'
U
O
O
L
O
ca
06
N
•-
•-
V
I'►
1
1
70
—J
M
ti
0
61%
CO
W
n000
W
X
W
J
0
U
O
M
O
N
N
O
N
-
- 0
N
r,400.0
0
N
Lfl
O
0
�
N
N
0
lfl
�
O
0
N
N
p
0
0
0
O
O
M
N
Ln
lD
n
- O
N
N
O
(�D
N
M
00
Q0
O
O
n
0
0
0
Lr)
O
m
(3)
Ln
�
OO
- O
O
�
O
M
�
N
r-i
00
O
OCD
Lr
m
O
O
0
N
Ln
O
C14O
M
Ln
tD
Ln
otj
O
- O
• M
r-I
Ln
O�
�
r-I
N
Lr1
lm0
N
al
00
CD
CDp
O
N
N
O
O
u1
r-
rN-I
I�
ON
M
tD
M
Ln
i--I
O
O
Ln�
N
I-
O
O
OO
O
O
u'1
O
O%-q
R*
O
- O
00
r -I
O
I-
lD
0)
Ol
�
of
Ol
M
O
O
0)
r -I
Om
ry�
O
I�
qt
N
l0
O
O-
O
41
_O
>
p
UE
O
w
Ln
O'
a--+
j
O
(D
f0
fB
0_
E��
Q
p
�
m
U
o_
C:c��
f6
�
i
w
4J
N
f6
v
a-
w
4
N
E�
�
a�
U
[6
i
�
i
Q)
�
W
p
V)
cu
CL
cu
u
Qo
N
O
N
0 kn o 0 0 0 0 0 o 0 0 0 0 0 0 0 0� 0 0 0 0 0 0 l 0 l 0 0�
O N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v') �t 00 O O O Okr) O
lrN O O O O O O O On O O I O O O N N- 0 0 0 O l- O --
l� kr) 0 0 0 0 0 0 0- N 00 �t W)I�t kr� M- W) O O O O N N --
O O - kn O 1�0 00 .--i - - qt 00 - N O kn N M
kn r
O
E
Q
519
N
N
w
0
x w 03�� 03� cl
~ ~ ~ ~ ~ ~ ~
0 0 0 0 0 0 0 0 0
'0 cn
cn
C'dQ a a o
U U U U U U U U U W W W W W W W W w w w
N U
O NO3
0 0 ~ �'
00
Cd
� o Po
y cd ~ ,1� 'C U
"C o "C 00 i u w x U° p `� '" 0 0 0 8� C7 P� W 5 o v1 E- per,
C6
L
O
C^/)'
W
a--j
L
N
Ln
�
—_
Y L
E
to
Y
N
N
O
O
0
0
0
N
E
m
�o
LL
ro
N
O
N
�
as--+
.�
•
L
4
L
N
V
Lr)
N
i
O
N
Z3
cn
cn
N
O
Q
N
O
L
O
�
O
L
O
N
ca
�p
N
O
O
�
U
},
Ol
w
N
' cn
�
cn
cn
C6
—
�
O
Q
Q
N
O
U
O
=
r14
r
LC-,
OZ,
CD
IN
T
cv
C-7
= ,
C -
—
C7
co
—f
n—
4
C
T
[11
b3
hFt
trt
f{j
iL}
w
T
Ln
r
CD
t
CN
Q S
C7
ti
ti
C3
tzr
T
s,'i
fAl
r
CN
4fi
6H
fbH
Ef3
CQ
Lr}
u;
r
r
CD
el-)
r O
m
Lrl
CN
CQ
CQ
r
L-%A
V
W
V
Ln
o a) ai ai ai ai
N rl rl rl rl rl
m m m r� RZI- RZI-
00 m Ln M N �
rI N N m m
Ln
N
tn
tn
O
N
'
�
O
�10
O
(10
qz:l-
k.D
N
•
�
00
�n
al
N
�
O
rl
rl
rl
N
N
M
q:zj-
Ln
O
M
N
rl
°�..,°
rl
00
N
(.0
q*
O
(.0
m
�D
rn
O
Ln
•
Ln
•
N
O
O
O
O
O
O
O
r♦
O
O
O
O
O
O
r♦
O
N
Ln
a1
m
O
•
o
N
cn
.
Ca
L-J{n-
U
•
O
O
O
O
O
O
O
Zt
On
o
�
.
000
�
o
lD
ri
N
ZzY
Ln
Ln
to
N
•
NI
'
m
a
-cn-
-cry
V)-
-cry
-cn-
O
O
O
O
O
O
O
O
O
O
O
O
+-
O
O
m
0
0
0
0
0
0
Sri
Sri
0
N
•
-V)-
tn-
tn-
tn-
tn-
tn-
m
N
N
N(D
O
9
Lo
M
o
I
W
o
0
0
0
0
0
0
0
0
0
0
d'
M
—
N
L')
M
,:I-
N
M
CO
M
CO
M
LO
' -
00
',:1-
M
I�
LC)
N
L-)
U-)
,:I-N
�
(D
L-)
CO
�
CO
Q
ti
N
CO
N
ti
N
Lo
N
Lo
N
L-)
N
L-)
N
CO
N
M
N
N
I.,
N
I
W
z
��
o
0
0
0
�
o
o
Lo
o •
O
Q
to
LO
I�
O
O
O
0
Lq
Lq
Lq
Lq ,
LO
cY
LO
N
cY)
0
0
L")
m
O
N
O
O
O
O
O
O
N
>-
I�
I`
O
�
N
�
CO
CO
CO
Ln
T -
i
ti
I`
N
m�
M
O
CO
CO
m
O
00
�
CO
00
Ln
O
N
00
O
00
i JO
Ln
I`
M
M
M
00
I`
�
N
X
CO
CO
I�
M
A
N
I`
CO , CD
Q
M
M
M
CM
CM
�
�
�
Ln
CO
i
Ln
CO
I`
00
O
O
N
co
Lf)
Q
�
�
�
N
N
N
N
N
N•
W
I O
O
O
O
O
O
O
O
O
O
O
I
N
I
N
N
N
N
N
N
N
N
N
N
RM
0 � a-
° () o
--se �c
ro ' W J O ru is
C6 � a--+
� i Q
ca N O p }+
m C� z or- cn z cn cn
Om0
l0
to
m
I;t
O
N
w
O
t.6
r-�
r-�
O
N
N
M
Lli
o6
N
N
N
m
M
M
m
m
m
Q
L
_0
�
M
Ca
C6
—
>
m
2
m
cn
•�
_
N
U
N
�F
_0
Ov
�
-6
�
�
o
—
3:Q
J
i
J
LL
cco
G
T
01
J
0
u O
c v
o
m
� O
� O
0 O
00 N
01
U
O
U
00 M
s
U a0
o O
Ln
\
\ \ \
o
Im
0o m
oo
�0
00
to
rn
r,
o
o
O
-ii
LM
Ol O
O
4�
M
O
Lri
V
-4
m
N-I
c
N
W
a) N
O N
O
O
lD
lD
1,
Cl
O
00
n
V
O
O
O
N
O
O
O
O
rn
O
00
Ln
n
ei
lD m
ci
N
N
V
00
O
V
O
Ln
O
r-1
00
an m
Ol
00
00
K*
Ol
LM
Ln
Ln
O
to
r-
V
O
rl
O
m
N
c-Z
rV
O
O
�N-I
W
O r1 00 N O l0 rP Ln ri O I, O O O O ap) 00 P
S cO-I M-1 N N � N � W O� O� O N 00
O � Ln m o6 00' m m 01 N Ln O I- O e N' rl' d
Ln Ln ZT Ln Nr-I Lf)r-I r-I lD —1 M iN-I N Ln
O
a)
Q
0-
tn �
O
i0 U
O j
E a1
W J
c
i Q)0
p C 1A
f0 Y U i N
LL u O _0 U
N 7 O O O
ON U m 3
y y } LL
U a) c c c v a
O v c v a, o 06
+• -6 Y OO i
O) O
aco
Q
H CV p_ Li > pOp O
N EO L u p oA a) cL y Co
d Y ,(D12 Q C w Y W 2 U
a) — � to .p_ p a) a)
E-- O O O U a)
Y u U O O 2 a) � c0 'O O
E E c a,
v .� (J
o i 0 LL F; .E
� -o Y O v � c �
a, Q0 i a)
O c O co
V) g
u C t tN0 cN6 fN6 O •'= oA ++ L
a �v o@ v v v E Y c
°� o � a) a) b e b o v o a+ > v
Ln m o- cc_ o D Ln Ln o Z
0
0
0
O
O 000
m
Ln$^
20
N
O
o ai
.o--I
o Lri
q
m
o
�^
S
4
O
O
O
N
O
O
O
n
O
O
O
rq
0
0
ei
O
O
O
00
O
O
00
O
LNn
Ln
O
000
LLo
-4
N \ 00
Ln 00
N N O
FO
O O
O
Il
O O
h
O O
S
00
V 0 0
00
O N
N
N
O Ln
1�
O Ln
Ln
O
0r0 ID
-4
a -I
rl
C
a)
E
a)
u
a
a)
or
bo
m
c
_0 v L
Q
LL_
Li .
- -
Ir o .a
d w w c
�
W
O
H (A
0
U
N t
H
^
i° IA c
O
c�
U
LL
IA m
LL
u
U
a)
O
U
C
J LYLL
'O
Ci6
-, C LL.
u
M
U
Y
cL6
U-
0
C07
a
f6
i
= d
H
0
iA
a;
O
cu
L
N
v
O
O
O
O
0
N
Q
L
p
O
00
>O
O
Or-I
O
O
O
O
+'
4-;
'N
X
4-J�
�-
X(3)
��
u_
-a
O
0
�o
j10
Q
M
Q
Ln
N
��V
O
p
O
J
4—
>
�
O
O
LL
i�
a--+
N
Ln
E
L
>,
>
V)
_
V
M
X
a--+
U
a--'
O
.
J
O
'�
n )
•—
r+
m
V)
p
4-0
N
M
O
EN
3
O
•—
/U�
LL
4-J
Q
cr
a
a-
W
W
C
d
V)
N
c6
V)
c6 w
cn LL
N
•� O
cn
m
o �
o �
o�
N
M •�
•V). 4-,
O
v U
V
>
N �
O
X
N
N
UP) cn
Q 4-1
O U
= O
LL O
O
4-0O
Q N
Ln
4-0
M O
NU O
• = 1
W
N
a v)-
V
cu
4�
LL
V)
0
E
Ul
N
i
U
C
O
O
C6
s
E
N
m
�U
U
U
11
O
0
O
s
Lm
u
0
Cu
LL
LL
Q
C)
w
E
a-+
O
11
C%.•
MO
'lz
AGENDA ITEM - 3B
'It
-AII�)E_N HILLS
MEMORANDUM
DATE: November 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Julie Hanson, Assistant to the City Administrator/City Clerk
Jess Skalicky, Parks and Recreation Manager
SUBJECT: 751h Anniversary Budget
Budgeted Amount: Actual Amount: Funding Source:
Council Should Consider
Council should discuss designating a budgeted amount toward funding the production of Arden
Hills' 75th Anniversary event.
Background
Staff is requesting that Council discuss and provide direction on if they wish to designate 2026
City budget dollars for the 751h Anniversary Planning next year. Please refer to the attached
October 27 work session memo and attachment for the background on this item.
The 751h Anniversary Planning Committee is meeting on Thursday, November 13. Should the
Council designate budget dollars, this will aid in planning decisions and will allow the
Committee to move forward with securing specific activities.
Attachments
Attachment A October 27 work session memo and attachment
Page l of 1
Attachment A
ac -
HILLS
MEMORANDUM
DATE: October 27, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Julie Hanson, Assistant to the City Administrator/City Clerk
Jess Skalicky, Parks and Recreation Manager
SUBJECT: 75th Anniversary Budget
Budgeted Amount: Actual Amount: Funding Source:
E.1
Council Should Consider
E.1
Council should discuss designating a budgeted amount to fund the production of Arden Hills'
75th Anniversary event.
Background
At the February 10, 2025, Council Work Session, Council directed staff to form a committee
comprised of staff and resident volunteers to plan the Arden Hills 75th Anniversary. Staff
opened applications for interested residents and commission members to join the 75th
Anniversary Planning Committee, and the group was approved and appointed at the August 11,
2025, City Council meeting. Since then, this group of five residents, two Council liaisons, and
three staff members has met three times to discuss the 75th Anniversary and has selected Friday,
July 17, 2026, as the date for an Anniversary Celebration at Cummings Park from 1 p.m. to 8
p.m., in conjunction with the annual Penny Carnival.
The proposed community event will celebrate the City's 75th Anniversary with a fun, inclusive,
and family -friendly gathering that highlights the city's history and community pride. The 75th
Anniversary Committee has identified a live band, a car show, historical displays, and family -
friendly activities as key components of the celebration. Depending on the budget, the event
could also feature food trucks, local vendors, lawn games, bounce houses, face painting, a drone
light show, and other festival -style elements. Estimated costs may include event infrastructure
such as stage rental and sound support, portable toilets, security, event supplies, and additional
entertainment options ranging from bounce houses to cultural performances.
Page 1 of 2
The 75th Anniversary Planning Committee and City will seek sponsorships for the event, but
sponsorship dollars are unknown.
While not all activities listed above may be included in the final program, Staff is seeking
guidance from the City Council on a budget amount to potentially offset associated fees, which
will provide some flexibility in final event design.
Budtet Impact
The City Council previously designated $12,500 of the Twin Cities Gateway grant funds for the
75' Anniversary but these dollars must be used toward marketing for the event. If Council
direction is given to include budget dollars in 2026 for 75th Anniversary planning, Staff will add
this amount in the November budget work session discussion for consideration as part of the
final budget adoption.
Attachments
Attachment A — 75th Anniversary — Event Cost Estimates
Page 2 of 2
Attachment A
75' Anniversary - Event Cost Estimates
Food & Drink
• Food & dessert trucks - $200 each
Music & Bands
• Bands - $2,000 each
• Stage rental -$1,800 each
• A/V support staff - $1,300 each
Kids & Families
• Bounce houses - $400 each
• Bubble station - $300 each
• Petting zoo - $1,500 each
• Roving entertainment-$300 per hour
• Face painting -$150 per hour
• Balloon artists -$150 per hour
• Arts & crafts area - $500 each
• Naturalists area - $300 each
• Yard games-$300 each
Community Engagement & Placemaking
• Themed photo booth - $1,000 each
• Face cut-out boards - $300 each
• Pop-up installation art -$1,500 each
• Chalk art / eating contest / puzzle contest - $200 each
Large Scale Options
• Drone show -$12,500 each
• Movie in the park -$1,500 each
• Car show-$2,000 each
Logistical Necessities
• Security -$1,200 each
• Portable toilets & handwashing stations - $750 each
• Wayfinding signage - $300 each
• First aid tent -$500 each
• Barriers between people & cars -$500 each
• Miscellaneous event supplies -$1,250
Activity
Price
Per
Qty
Total Price
Food & Drink
Food & dessert trucks (6)
$200
each
2
$400
Music & Bands
Bands (1)*
$2,000
each
1
$2,000
Stage Rental*
$1,800
each
1
$1,800
A/V Support Staff*
$1,300
each
1
$1,300
Kids & Families
Bounce houses (2) *
$400
each
2
$800
Bubble stations (1) *
$300
each
1
$300
Petting zoo (1)
$1,500
each
1
$1,500
Roving entertainment (2 hrs)
$300
hour
4
$1,200
Face painting (1 hr) *
$150
hour
4
$600
Balloon artists (1 hr) *
$150
hour
4
$600
Arts & crafts area (1) *
$500
each
1
$500
Naturalists area (1) *
$300
each
1
$300
Yard games (1) *
$300
each
1
$300
Community Engagement & Placemaking
Themed photo booths (1)
$1,000
each
1
$1,000
Face cut-out boards (1)
$300
each
1
$300
Pop -Up installation art (1) *
$1,500
each
1
$1,000
Chalk art / eating contest / puzzle contest (1)
$200
each
2
$400
Large Scale Options
Drone Show
$12,500
each
1
$12,500
Movie in the park
$1,500
each
1
$1,500
Car Show
$2,000
each
1
$2,000
Logistical Necessities
Security
$1,200
each
1
$1,200
Portable Toilets & Handwashing
$750
each
1
$750
Wayfinding Signage
$300
each
1
$300
First Aid Tent
$500
each
1
$500
Barries between people & cars
$500
each
1
$500
Miscellaneous Event Supplies
$1,250
each
1
$1,250
Approximate Total: Basic Festival Events* +
Logistics:
$14,400.00
Total: Must Have Events +
Car Show + Drone Show
$28,900.00
AGENDA ITEM - 3C
-ARVE_-HILLS
MEMORANDUM
DATE: November 10, 2025
TO: Honorable Mayor and City Councilmembers
Jessica Jagoe, City Administrator
FROM: Julie Hanson, Assistant to the City Administrator/City Clerk
SUBJECT: Draft 2026 Fee Schedule
Budgeted Amount: Actual Amount: Funding Source:
Council Should Consider
Council should consider providing feedback and direction on the proposed 2026 draft fee schedule.
Background/Discussion
The City Council annually establishes a fee schedule for administrative, building construction,
engineering fees, liquor licensing, park and recreation facility usage, planning and zoning, utilities,
business licenses, utility fees, and other miscellaneous permits and penalties that are enforced by the
City.
The following recaps the fee schedule changes that were made for 2025:
• Administrative — Dog and cat licenses became a lifetime license at a fee if $50 and Bethel
students at $15.00. NOTE: Staff will be asking for further clarification on the student rate
for 2026
• Building permit and plan review fees — Fees are always based on the most current Minnesota
State Statutes 326B.153 and 326B.148, so the reference to a specific year was removed.
• Commercial fees for electrical permits — Tokle Inspections changed the structure for
commercial electrical permit fees to be more proportional to the project. Residential electrical
permit fees remained unchanged.
• Liquor Licensing — The liquor license violation fees were increased.
• Parks and Recreation — Youth athletic association field rentals increased from $38.00 to
$40.00 and a damage deposit of $200 for park pavilion rentals by residents was established
(this damage deposit was already in place for non-resident rentals). The option to reserve
additional picnic tables was removed due to potential unavailability of staff to accommodate a
request.
• Planning and Zoning — There were no changes in 2025.
Page 1 of 5
• Public Works/Engineering — There was a $5 increase to right-of-way, right-of-way small cell
wireless facilities and grading and erosion permit fees. Call -out fees related to weekdays and
weekends were clarified.
• Utility Hookup Charges — Re -inspection fees that include weekdays and weekends were
clarified. The fee for a I" water meter was increased from $590 to $650 and the hydrant
rental fee was increased from $32 to $33.
• Miscellaneous/Retail Activities — An Event Center was added to an existing Business
Licensing category for Amusement Facilities that had an associated fee of $105, and the
category was aptly renamed to Amusement and Event Facilities. In addition, the Adult
Cannabis Retail Sales Registration fees (initial and renewal) were created. The reference to
Mobile Food Unit/Food Truck licensing for vendors was removed.
• Miscellaneous Fees/Permits — An Adult Cannabis Event Permit Fee of $100 per event and
Illegal Adult Cannabis Sales violation fees were established. In addition, the tobacco violation
fees were increased. Note the Council had also previously capped the number of tobacco
licenses at six (6). We currently have five (5) licenses, so there is one more available.
• Utility Use Charges — Increases in 2025 were as follows: 9% sanitary sewer rates and 3%
surface water rates. No changes to water fees were made.
The information below outlines changes recommended to the fee schedule for 2026. Proposed
changes to the fee schedule are noted in red print on the attached draft 2026 Fee Schedule
(Attachment A). Explanations for these proposed changes are provided below.
Buildinz Construction (Sec. II)
Commercial and Residential Building Permit Fees: Staff is proposing changes to be more clear and
be adjusted to be more consistent with surrounding communities, based on the schedule set by the
State in statute. Beyond the separation of permit fees and plan review on the revised fee schedule,
staff also proposes increasing some permit fees to be in line with surrounding communities.
Language has also been added related to permit refunds to mitigate confusion. To provide clarity to
the applicant, specificity in the type of fee, the fee surcharge and the relationship to State Statute and
related calculations was addressed. This aligns with updates from Tokle Inspections in 2025 to have
commercial electrical permits be more proportional to the project. Also proposed is to add language
to the table to be more specific about flat fees and to include a minimum state surcharge of $1 (as
allowed by law) for flat -fee permits. This will also serve to reduce the burden on the applicant in
determining total fees and costs; it is more likely than not to result in a fee schedule that is more
proportional to the project; and is in the interest of the outcomes described in the Council's adopted
strategic plan regarding customer service.
Commercial Mechanical and Plumbing Plan Review Fees: The City conducts commercial mechanical
permit plan review in-house and has not historically charged a fee for such. This is a time-consuming
effort and staff is proposing to establish a plan review fee for commercial mechanical permits as
allowed in state statute. That is 65% of the permit fee. In addition, commercial plumbing permit plan
review is conducted by the Minnesota Department of Labor and Industry (DoLI). Staff proposes the
City contract with Rum River to be the delegated commercial plumbing plan review service. Not only
would the City then receive a percentage of each permit and plan review fee, as determined by the
contract with Rum River. This would add revenue the city is not receiving today. It would also reduce
the timeline for an applicant to receive a permit, as DoLI's review times are in excess of four to six
weeks much of the year. Rum River can provide a much more reasonable timeline.
Electrical Permit Fees: The City continues to contract with Tokle Inspections. Tokle has increased
pricing for both commercial and residential items which are reasonable increases comparatively to
surrounding cities — please see the attached Exhibit A.
Page 2 of 5
Parks & Recreation (Sec. V)
Staff is proposing a number of changes to this section. The following details the proposed changes:
• Reorganized for readability: The previous schedule often had multiple fees in a single cell,
which made it hard to read. It has now been reorganized so that each line item has a single
dollar amount associated with the specific fee.
• Missing fees: Some categories did not have fees listed and so reasonable, comparable fees
were added to fill those gaps.
• Security deposits: While we rarely retain security deposits, the current amount does not fully
cover damages when they occur. Based on feedback from maintenance staff, increasing the
deposit to $300 is proposed to better align with potential costs.
• Refunds: The previous schedule did not include refund information. Clear guidance has been
added outlining when refunds will be issued.
• Pavilion & Picnic Shelters: In order to remain consistent with our current practice, it is
suggested that we remove the options of I I am - 4 pm and 5 pm - 10 pm. Instead, renters will
have access to the building from 10 am - 10 pm on the day of their rental, regardless of their
actual event time. Currently, Parks Maintenance staff has requested we only allow I rental per
day, so this will align with that request.
• Taxes: All prices now include the 8.375% tax. This makes the document easier to read and
ensures renters see the total price upfront.
• Notes: Staff has removed outdated or unnecessary notes and added clarifying notes regarding
Youth Athletic Associations Ballfield rentals to ensure consistent application of fees and
refunds to all users.
Rounding: All fees have been rounded to the nearest $5 for consistency and readability.
Planninz and Zoning (Sec. VI)
Changes reflect an increase in fees and escrow to accommodate a fee schedule that is more
proportional to the staff time dedicated to the type of project, including legal consultation. The
minimum fee for labor-intensive planning cases was increased by $50. This was to address the
amount of time taken by individuals in the various departments that take time to address a planning
and/or zoning application. A consistent flat minimum fee of $100 for small scale projects that require
time from the community development department and administration is proposed to better reflect
staff time.
Public Works/Enzineerinz (Sec. VII)
This section has been substantially revised and includes several new items which better reflect
existing City ordinances and/or State statute. The proposed changes for Right -of -Way permits,
Grading & Erosion Control permits, Restoration fees and the addition of a section for Billable Rates
for City Equipment and Labor will allow staff to manage permits more efficiently and match the
Building Department's process. The associated Administrative Fees match market rates and account
for the procedural process that will be followed.
New fees related to Water Tower Telecommunications and related plan review, inspections,
maintenance and repair access are also proposed to be added. These fees will improve the process for
water tower related permits. Staff also proposes adding a new Water shut-off/turn-on line item that
clarifies the current process for water on/off requests that are received.
Page 3 of 5
The Hydrant Meter Rental item was moved from Section VIII Utility Hookup Charges to this section,
and proposed fees include an inflationary increase.
Utility Hookup Charmes (Sec. VIII)
Staff is proposing increases to various permit fees in this section and recommends the addition of
Escrow fees where indicated. Adjusting for residential and commercial work reflects and accounts
more accurately the actual costs of inspection and review efforts depending on the scale of the
project.
As stated above, the Hydrant Meter Rental item was moved from this section to Section VII. A new
subsection for Water Meter/Spacer Charges has been added. The proposed language in the associated
fee column as written allows for flexibility of material price changes throughout the year.
The Customer Requested Water Meter Accuracy Test item was moved under the new subsection and
the process has been updated to reflect the current process. The language now clearly shows fees for
the requestor and saves staff time coordinating an estimate for services if not pursued by the
requestor.
TCAAP WAC/SAC
At the June 9th work session, Ehlers presented on SAC/WAC fees for Rice Creek Commons
(TCAAP). These development fees will pay for the public improvements installed by the City for
Rice Creek Commons. As part of the 2026 fee schedule discussion, city staff is bringing forward the
recommended SAC/WAC rates prepared by Ehlers that would be paid as development commences at
the time of the building permit. It should be noted that this is one of two ways the City can have the
development pay these costs. The other route would be special assessments levied against the
property and paid semi-annually with property taxes. In the absence of a cooperative agreement with
Ramsey County for alternate funding, the City continues to maintain our preference to assess the
project. Due to timing, by setting these rates, the City will be protected to make sure that we collect
the equitable share of public infrastructure costs on the Thumb Parcel as well as the California Parcel
with any future vertical development. Discussions would continue with Ramsey County and
Developer(s) to finalize how these costs are memorialized for repayment to the City.
Miscellaneous/Retail Activities (Sec. IX)
No changes are being proposed.
Miscellaneous Fees/Permits (Sec. XI)
Staff proposes adding a new line item for Council Approved Abatement with a related administrative
fee of $340.00 which will cover staff administrative time. Construction Activity Waiver has been
updated to reflect that this is a Night Time waiver and there is a proposed adjustment to the fee,
increasing it from $263.00 to $340.00 as this fee has not been adjusted since 2017.
Utility Use Charzes (Sec. XIV)
An increase to water (4.0%), sanitary sewer (3.0%), and surface water (6%) fees are recommended.
Page 4 of 5
Recyclinm Fee (Sec. X0
The City Council will be asked to adopt Resolution 2025-070 setting the 2026 recycling fees at its
regular meeting later this evening. The proposed amounts for 2026 recycling fees include an increase
to $123.00 for a residential parcel with curbside recycling service. The fee for residential recycling
without curbside recycling will remain the same at $3.75 per residential unit.
Attachments
Attachment A: Redlined Version of Draft Ordinance 2025-OXX — Appendix A — 2026 Fee Schedule
(includes State Bldg and Surcharge Statutes and Tokle Inspections Fee Info)
Page 5 of 5
lmt ILLS Attachment A
City of Arden Hills
Ordinance 2025-OXX — Appendix A
2026 Fee Schedule
I. Administrative
Chickens — Licenses Two years (Pro -rated for second year $30.00
$15.00
Dogs/Cats — Licenses
(Residents)
Lifetime
$50.00
Dogs/Cats — Licenses
(Bethel Students
Lifetime
$15.00
Dogs/Cats — Boarding
$22.00 per day
Dogs/Cats —
Impoundment Fee
$50.00
Dogs/Cats — Surrender Fee
Each
$25.00
Dogs — Residential
Kennel License
Annual
$21.00
Dogs — Dangerous Dog Fee
Annual
$500.00
Dogs — Potentially
Dangerous Dog Fee
Annual
$250.00
Copying —
General City Material
$0.25 8 1/2 x 11 and Legal; $0.50
large. Per Page. Add postage if
mailing copies
Assessment Search
$53.00 per half hour
Private Activity Revenue
Bonds
Non-refundable application fee
$500.00
Annual Administrative Fee
1/8 of 1% (0.125%) of
outstanding principal balance of the
bonds for the life of the bonds
Reimbursement of all City costs
U. Building Construction (All permits are non-refundable after 90 days)
Building pefmits
Permit .,,-,.1 Pl.,,-, Review
Fees be based to
shall aeeer-diag
State Statute 326B.153
. e ,lete.., i e,l by the C ty's
Fees
and
commer-eial Building ing
65- Building ing De,-m t Fee
Per-mi s
Plan Review Foe
of
Payment half this fee is
e"aling of
.l„e .,t time fPe..m t s„I„m;tt.,l
(non .e Rind b,l e)
Residential Building
Permits
Permit
Fees shall be based according to
State Statute 32613.153
and are determined by the Cites
Building Official. Minimum
$99.00 + $1.00 State Surchar e
Escrow
Determined by the Building
Official up to $5,000.00
Commercial Building
Permit
Fees shall be based according to
Permits
State Statute 32613.153
and are determined by the Cites
Building Official. Minimum
$99.00 + $1.00 State Surchar e
Page 1 of X
Escrow
Determined by the Building
Official up to $20,000.00
Residential New
r rsti-d tief Additions
Eser-O
To be deteFmined by Building
Offieia165% of permit fee, except
for residential projects requiring
Plan Review
plan review that do not exceed
$15,000.00 in valuation
Commercial Building and
65% of permit fee for building and
Mechanical Plan Review
mechanical pjqj,eIcts.
Commercial Plumbing
This will be updated based on City
contract
Plan Review
Temporary Certificate of
Occupancy (CO)
Escrow
To be determined by Building
Official
Building Permits—
Re -inspection
$63_25 re- State Statt e
2'�375.00
Building Permits —
Manufactured Home
Location
$100.00 99.00 + $1.00 State
Surcharge fee as ,,tAli oa i State
Statutez48
Building Permits —
Demolition
Permit Fee
$100.0099.00 + $1.00 State
Surcharge fee as eu4lified i
Statute 24B448
Escrow
$2,000
Building Permits —
Special Investiations
100% of Permit Fee
State Surcharge —
based on valuation
Fee based on State Statute 326B.148
State Surcharge —
Fixed Fees
Fee based on State Statute
326B.148
Plumbing Permits —
Minimum Fee
$60.0065.00
Plumbing Permits —
Residential
° $15.00 per
fixture
Plumbing Permits —
Commercial
4-.2-51.50% of Project Value +
$50:0080.00
Electrical Permits —
General
See Exhibit "A" attached to fee
schedule
Mechanical Permits —
Minimum Fee
$75.00
Mechanical Permits —
Residential
2% of Project Value
Mechanical Permits —
Commercial
4-.2-51.50% of Project Value +
$50:0080.00
Fire Protection Permits —
Permit Fee
Fees shall be based according to
State Statute 326B.153 and are
determined by the City's Building
Official
Fire Protection Permits —
Plan Review Fee
65% of Permit Fee
Fire Protection Permits —
Re- inspection
$63.25 per State Statute
326B.153
Permit Refunds
Refund requests must be in writing
and will only go to the payee.
No refunds if:
• An inspection has been
performed
The base/minimum fee will not be
Page 2 of X
refunded. The license check fee will
not be refunded. The State surcharge
will not be refunded.
HI. Liquor Licensing
On -sale
1,999 square feet (SF) or less
$3,465.00
On -sale
2,000 (SF) — 2,999 (SF)
$4,620.00
On -sale
3,000 (SF) — 3,999 (SF)
$5,775.00
On -sale
4,000 (SF) or more
$6,930.00
On -sale, Sunday
$200.00 (340A.504 Subd. 3(b)
limits $200 fee for Sunday sales)
Off -sale
$210.00
Club Fee
$315.00
On -sale, Malt Beverage
$126.00
Off -sale, Malt Beverage
$42.00
On -sale, Wine
$ 2,000.00
(340A.408 Subd. 2(c) limits fee
to $2000 or half of on -sale
license fee, whichever is less)
Strong Beer
When part of On -Sale Wine License
No Charge
Investigation Fee
$158.00
Minor Consumption
Violation with Server
Training
First Violation
$500.00
Second Violation
$1,000.00
Third Violation
$1,500.00
Fourth Violation
$1,500.00
Minor Consumption
Violation without Server
Training
First Violation
$1,000.00
Second Violation
$2,000.00
Third Violation
$2,000.00
Fourth Violation
$2,100.00 and may be subject to
license revocation
IV. Maps and Ordinances
Zoning Ordinance
Municipal Code
Comprehensive Plan
$0.25 per side
Color Maps (8.5 x 11)
$2.00
Color Maps (11 x 17)
$4.00
Street Maps
$2.00
As-Builts (11 x 17)
Based on number of copies
and staff time
V. Parks & Recreation THIS SECTION WILL BE REPLACED WITH THE ATTACHED
DRAFT SECTION V.
) ,e t>, n tt,let;,. n t; r
Per- two het . time blee
enn nn per- time blee
o
sse-ei
Field RefAal inel
Nv�i
Adult 04,1 latfamor-al
Pef two hetir- time blo
$55.00 per- time blee
i 4 3 7c0% . plieabl a twi
Field RefA l
Ball Field Rental,
r- o . time b!E) L
Per- hou
To e t fees e o-At.•.,
Q 110.00 per- time blee
0
Ball Field D of4a
Lighwfees
Per ietir- time leek
$1 3 5.00 per- time 1.loe
L 4 3 7c0% ., „1;eable tax
-two otifn me
are &AF&
M rye
tm
Page 3 of X
• .. .� .�
• J•
m.
D Shelters Reside
Available lable for- fese,afie fl
N-&-G�
enie -
D enie Shelters
Non ResidepA
Available hale f f: fese ,., ie
ezn nn
* Q z7coi , rl;,.ab]
�
nenie U.D
ineltides tip to five pienie t
$ 1 25 nn
damage
time
L $200 nn
0
yiii enisq esimieli
per- slot
deposit 4=
*Rental
Fee is
i�wived
to all n,
e inresi
—ents. f The
tax
ATA
sefee�_
�a
Page 4 of X
D.,.,m Ref"
City 14a! is Y n
r r f fence Roe
l bu1.
„lingf:00Mafter-
Do,- Day
Regular
No b
(C'..he
-business
Guard:
e e
Qty-
Cover-nment: No
ehar-ge
Resident
Non profit -.—
Resident
For- profit--
Non Resident—,
Non PFOMF
Non Resid nt f
FOF PFOfit'
5%
usifiess
Resident:
$200-
Non Reside-
$2,15
t4r-9.375-r�
,milie b.letax4
in the
�zseneeof a eit3e�e�
is-��@+c- miethe City
OR ei:m siness eiffn.
8.:00 any n )
(Nonb usi,�o4� b.,,, q*
4A.'eelkendds holidays)
€``€firstag cc`,ail
plihea4i, n).
and
c eem Reno !
Damage Deposit
7
R2gHiiCtt
�z`w:vv
Q2000 4 Q 37coi „..lie b.le tax.
NTGR, TAT.
VI. Planning and Zoning (Each separate land use request shall be charged a separate administrative
fee and escrow even if submitted on the same application. Costs expended in reviewing and processing
an application will be charged against the cash escrow and credited to the City. Charges to the escrow
include planning and engineering staff time, City attorney and consulting fees, and mailing costs. If, at
any time, a required cash escrow is depleted to less than 20% of its original amount, the applicant shall
deposit additional funds in the cash escrow account as determined by the City. The escrow may be
reduced or increased by the City Planner on a project by project basis.)
Description:
Escrow Fees:
Initial Application Fees:
Preliminary Plat
Administrative Fee
$500600
Escrow
$2,500
Final Plat
Administrative Fee
$450400
Escrow
$4-,0001,500
Lot Split/Minor
Subdivision (R-1 and R-2
only)
Administrative Fee
$3-50400
Escrow
$1,500
Rezoning or TCAAP
Regulating Plan Map
Amendment
Administrative Fee
$500
Escrow
$1,500
Comprehensive Plan
Amendment
Administrative Fee
$550600
Escrow
$2,500
Variance or Permitted
Adjustment
Administrative Fee
$3-50400
Escrow
$4000I,500
Conditional Use or Interim
Use Permit/CUP or IUP
Amendment
Administrative Fee
$400500
Escrow
$1,500
Planned Unit Development
Master Plan or Special
Development Plan Master
Plan
Administrative Fee
$600
Escrow
$2,500
Page 5 of X
Final Planned Unit
Development or Final
Special Development
Plan
Administrative Fee
$3-50400
Escrow
$2000
Planned Unit Development
Amendment or Special
Development Plan
Amendment
Administrative Fee
$400
Escrow
$1,500
Concept Review
Administrative Fee
$300400
Escrow
$7501,500
Vacation of Easement
Administrative Fee
$450200
Escrow
$1,000
Site Plan Review
Administrative Fee
$450600
Escrow
$1,500
City Code Amendment
Administrative Fee
$3-50500
Escrow
$4-,5002,000
Zoning Code or TRC
Amendment
Administrative Fee
$400500
Escrow
$�5002,000
Zoning Letter
Administrative Fee
$75100
Land Use Requests - Not
Already Specified
Administrative Fee
$150
Escrow
$1,000
Zoning Permit
Decks under 30", Driveways, Fences,
Sheds, Temporary Structures, and
Chicken Coops
$65100
Commercial Parking Lot
Resurfacing
$400200
Recreational Vehicle
Parking Permit
7 Day Permit, renewable once per 12
months
$25
Home Occupation I Permit
No charge
Home Occupation 11 Permit
Administrative Fee
$150
Escrow
$500
Commercial Outdoor
Display and Sales Area
Permit
$100
Commercial Recreation
Outdoor Permit
$100
Appeal of Administrative
Zoning, Sign, or
Subdivision Decisions
Administrative Fee
$450200
$4-,0001,500
Escrow
TCAAP Development
Related Professional
Services Charge
Any portion of the TCAAP
development can prepay an amount
on behalf of future parcels to be
developed and that the prepayment
amount will be netted out and the fee
schedule will be updated annually.
$2,743 per acre
VII. Public Works/Engineering
T be deto.•, iftea by Efig
nee
Right Way Pei:mit Small Cell
Per-mit for- to 15 leeafieffs-,-
Q 190.00 ROW fee, ,.or.
of
Wireless Faeilities
"
0 ena-nee0
eaeh4oea4EM
pet:m;t
$27 nn re.. eaf
Page 6 of X
Outstanding Balance Escrow
Balance owed on existing
110% of the amount owing
_permits from the same
ermittee
Annual Utility Owner/Contractor
Annual Registration Fee
$80.00
Re istration
Right -of -Way Permit — Excavation
Administrative Fee
$35.00
Excavation Permit Base Fee
$125.00 + $.20/LF of Trench or
Directional Bore
Escrow
Determined by Public Works plus
Outstanding Balance Escrow if
a licable
Right -of -Way Permit — Obstruction
Administrative Fee
$35.00
Obstruction Permit Base Fee
$50.00 + $0.05/LF + $50.00/EA(per
pole, cabinet tree etc.
Escrow
Determined by Public Works plus
Outstanding Balance Escrow if
a licable
Right -of -Way Permit - Small Cell
Administrative Fee
$35.00
Wireless Facilities/DAS HUB U
0 15 Locations per application)
Small Cell Wireless
Facilities/DAS HUB Permit
$100.00 per site; $500.00 minimum
Fee
Rent & Maintenance Fee
Rent: $180.00/ ear/utilit company,
lus Maintenance: $27/ ear/location
Escrow
Determined by Public Works plus
Outstanding Balance Escrow if
Applicable
Ri ht-of-Wa Permit — Permit
Permittee request to extend
$50.00
Extension
dates specified within the
permit
Right -of -Way Permit — Dela
In accordance with Minnesota
$25.00 + Permit Extension Fee
Penal
Rule 7819.1000 Sub art 3
Hydrant Meter Rental for Cit
Permit Fee Monthly Rental an
$200.00 + State Surcharge of $1.00 +
elated projects, only deposit
amount is required)
Water Usage
Rental of $50.00/mo, + applicable
standard water usage rate charged for
consum tion
Deposit
$2,500
Grading & Erosion Control Permit
Residential (grading work
Resident Self -performed $60.00
(required when land disturbance is
>2500 SF to 5000 SF or >50
Residential Remodel $200.00
>2500 SF or >50 CY or within
CY or within 1000' of
shoreland area)
Residential New Build $300.00
1000' of shoreland area as outlined
in Chapter 15 of City Ordinance)
Non -Residential
0 to 1 acre $350
>1 acre to 5 acres $550
>5 acres to 10 acres $1100
>10 acres to 20 acres $1650
>20 acres to 40 acres $2,200
>40 acres $2750 plus $500 for each
10 acres thereafter
Escrow
Determined by Public Works plus
Outstanding Balance Escrow if
a licable
City Performed Restoration Fee
City restoration or corrective
Actual cost of materials and labor
work of permittee's
res onsibili
plus 10% Administration fee
Page 7 of X
Billable Rates for City Equipment and Labor:
**O erator rate PLUS equipment rate will be char ed. All rates are per hour with a one hour minimum
Equipment Rates
Heavyequipment
Heavytrucks
Medium equipment
Medium trucks
Light equipment
Ught trucks
$175.00
$175.00
$150.00
$150.00
$100.00
$100.00
Operator Rates
Superintendent
Regular: Overtime
Lead Maintenance Worker
Regular: Overtime
Maintenance Worker
Regular: Overtime
Water Tower Telecommunications
Permit Fees and Escrow
Actual legal and consulting
Plan Review and Inspections
engineering costs + $200 admin +
$2,500 escrow
Water Tower Telecommunications
Per Call -out
No chargeg normal business
Maintenance or Repair Access
hours, otherwise After Hours Call -
out rates apply
Water shut-off/turn on
Per Call -out (plied to water
No chargeg normal business
bill)
hours, otherwise After Hours Call -
out rates apply
After Hours Call -out (Weekdays)
Conducted outside normal
business hours, minimum of 2
hours
$100 per hour
Holiday or Weekend Call -out Minimum of 2 hours $150.00 per hour
VIII. Utility Hookup Charges
Water Permits — Service
Installation/Repairs/Alteration/Re-
inspection (Regular Business
Hours)
Per inspection
$60.0080.00 for Residential
$250 for Commercial
Escrow
Determined by Public Works plus
Outstanding Balance Escrow if
applicable
Water Permits — Interior
Plumbing, New Home
$45.00
Water Permanent Disconnect
Fee to disconnect
$230.0080.00 for Residential
$250.00 for Commercial
Escrow
Determined by Public Works plus
Outstanding Balance Escrow if
applicable
Curb Box and Service Lead, 1"
Service Connection
Q,�00$80.00 for residential
Escrow
Determined by Public Works plus
Outstanding Balance Escrow if
applicable
Larger than 1" Service
Connection
Set by Engineer
Water Permits — Plan Check Fee
Set by Inspector
Water Permits — After Hours
(Weekdays) Inspection or Re-
inspection
Call -out rate per visit,
minimum of 2 hours
$100.00 per hour
Page 8 of X
Water Permits - Holiday or
Weekend
Inspection or Re -inspection
Call -out rate per visit,
minimum
of 2 hours
$150.00 per hour
e2 000 deposit, ,, ly -epA l e�
at
$33 nn t fee
water- po,.m of
$1 an nn State s,,,.,,h " 1 nn
-g
Pitts . plieAh-lo
Water- Mete/ 6e-r- Char-ges—
Customer- Requested Wa4er- Mete
Fee inel„des -e .,l f
meter-, Igor ti test t
to
mote. Size C
Basel
n f aet
P41ie Wef4Es for- Quote
r-ettiming meter- r-esidenee�,
Roo
be if the-
will not applied
meter- f ,,a t be
inaeettr-ate to degree-
,mot (34
4ffee
exeeeding p
f the be L,
f-,,,Y, the
result
test
Water Meter/Spacer Charges
Water-Meter,4Spase-r- Charges
Standard Meter
$48&98City cost plus 10% admin
fee
5/8" x 1/4" Meter Model 25
r P41ie Wafks f r-
3/4" x 7 1/2' Meter Model 35
naet
QHot-- i cost plus 10% admin fee
1"
$590.000 , cost plus 10% admin.
fee
Meter or rg eater
r r4aet Publie 3a',.,-vs for-
G-ea4e-tl,a 12
Quote
Customer Requested Water Meter
Fee includes removal of meter,
5/8" to 1" water meter: $250.00
Accuracy Test
installation and administration of
Greater than 1" meter: $500
temporary meter, testing services,
and returning meter to residence;
$855.00 per acre or portion
thereof
Fee will be reimbursed if the meter
is found to be inaccurate outside of
WWA allowed tolerances
Water Connection Fee -
Connection fee for previously un-
served or expanded lots
Water Availability Fee -
New or Additional Units
The units are based on the
Metropolitan Council's
formula for calculating new
sewer availability charge
SAC units
$ 1,375.00 per unit
TCAAP Water Availability
Fee
This fee applies to the
TCAAP development only.
$5,360.00
The units are based on the
Metropolitan Council's
formula for calculating new
sewer availability charge
SAC units
Sewer Connection Fee -
Connection fee for previously un-
served or expanded lots
$840.00 per acre or portion
thereof
Sewer Availability Fee -
New or Additional Units
The units are based on the
Metropolitan Council's
formula -for calculating new
sewer availability charge
$ 825.00 per unit
Page 9 of X
(SAC) units
TCAAP Sewer Availability
This fee applies to the
$2,310.00
Fee
TCAAP development only.
The units are based on the
Metropolitan Council's
formula for calculating new
sewer availability charge
SAC units
Sewer Permits — Service
Per inspection
$60.0080.00 for Residential
Installation/Alternations/Repairs/Re
-inspection (Regular Business
Hours)
Escrow
Determined by Public Works plus
Outstanding Balance Escrow if
a licable
Sewer Permits — Plan Review Fee
Set by Inspector
Sewer Permits — After Hours
Call -out rate per visit,
$100.00 per hour
(Weekdays) Inspection or Re-
minimum of 2 hours
inspection
Sewer Permits — Holiday or
Call -out rate per visit,
$150.00 per hour
Weekend Inspection or Re-
inspection
minimum
of 2 hours
Sewer Access Charge
Set by Met Council Annually
$2,485.00 (Contact Met Council)
Sanitary Sewer Utility Prohibited
Sump Pump Connection
$100.00 per month
Surcharge
DL Miscellaneous/Retail Activities
Boutique/Garage Sales
Application/notification of City
No charge
Hall required
Tent Permit
$55.00+ State Surcharge
Sidewalk Sales
$53.00
Adult Cannabis Retail Sales
$500 (Initial registration)
Registration
$1,000 Renewal
Business Licensing — Amusement
Includes arcade, dance hall,
and Event Facilities
event center, movie theater,
$105.00
poolibilliard tables, bowling
alleys, indoor tennis, skating
facility, outdoor tennis,
driving ranges, etc.
Business Licensing — Wholesale
Liability insurance required
$210.00
Bulk Fuel Storage
Business Licensing — Hotel/Motel
$6.50 per room
Business Licensing — Courtesy
$26.00
Bench, Non -advertising
Business Licensing — Courtesy
$79.00
Bench, Advertising
Business Licensing —
Includes musical devices,
$15.00 per location + $15.00 per
Mechanical/Electronic Devices
amusement rides, bowling
machine
alleys, etc.
(MN Statute 449.15 sets
maximum permit fee at $15 per
location and $15 per machine
Page 10 of X
Business Licensing — Retail Sales
Includes antique shops,
beauty/barber shops, boat
$53.00
dealers, Christmas tree sales,
dry cleaning, laundry, bakery,
candy, meats, wholesale
foods, caterers, motor vehicle
sales, optometrist, mortuary,
video sales/rentals, over-the-
counter tobacco sales,
vending machines (excluding
tobacco), & other
retail goods not listed
Business Licensing — Restaurants,
$21.00 up to 1,000 square feet
Cafes, Coffee Houses, etc.
$42.00 for 1001-2000 square feet
$63.00 for 2001-3000 square feet
etc.
Business Licensing — Restaurants,
$315.00
Drive-Thru
Business Licensing — Service
$105.00
Stations
Business Licensing — Grocery
$21.00 up to 1,000 square feet
$42.00 for 1001-2000 square feet
$63.00 for 2001-3000 square feet
(etc.)
Charitable Gambling Permit — Per
Includes investigation fee
$158.00
Minnesota State Statute, Chapter
349
3% of organizations' gross
Local Gambling Tax
receipts from all lawful
gambling, less prizes paid out
Lawful Gambling Fund
10% of net profits
Tobacco Sales License
Includes investigation fee
$300.00
Fireworks Sales
As part of existing business
$100.00 (MN Statute 624.20 sets
maximum permit fee at $100.00
Fireworks Sales
Exclusive Business
$350.00 (MN Statute 624.20 sets
maximum permit fee at $350.00
Massage Therapist
Annual Fee, Includes
$53.00
investigation fee
Massage Therapist Establishment
Annual Fee, Includes
$158.00
investigation fee
Recreational Outdoor Archery
$200 first year
Range
$50 annual renewal
Solicitors, Peddlers, Transient
Please reference Section 340
$158.00 background
Permit — For -Profit Organizations
of the Municipal Code for
investigation + $105.00 per
more information
month permit fee
Solicitors, Peddlers, Transient
Please reference Section 340
Permit — Non -Profit
of the Municipal Code for
No charge
Organizations
more
information
Tree Contractor License
$50.00
X. Signs
Initial Fee
Per Sign
$100.00
Permanent Signs, Annual
Per Sign, 100 square feet or
$25.00
Renewal
less maximum allowable size
Temporary Signs
$50.00
Signs, Impoundment
First Offense
$50.00
Page 11 of X
Signs, Impoundment
Second Offense
$75.00
Signs, Impoundment
Third Offense
$150.00
XI. Miscellaneous Fees/Permits
Rubbish Hauler
Annual
$158.00
Recycling Hauler
Annual
$158.00
Contractor License
Annual
$75.00
Miscellaneous Permit Fee
For all other permits not listed
$40.00
Adult Cannabis Event Permit Fee
Per Event
$100.00
Staff Research
$53.00 per half hour
Penalties for Late Payment
Failure to pay any penalty
imposed shall be grounds for
the
suspension or termination of
any license issued by the City
10% of license fee or $32.00,
whichever is greater
Adult Cannabis Sales, Illegal
First Violation
$1,000.00
Adult Cannabis Sales, Illegal
Second Violation
$2,000.00
Adult Cannabis Sales, Illegal
Third Violation
$2,000.00
Adult Cannabis Sales, Illegal
Fourth Violation
$2,000.00 and revocation of City
registration
Tobacco Sales, Illegal
First Violation
$1,000.00
Tobacco Sales, Illegal
Second Violation within 36
months
$2,000.00 plus 3-day license
suspension
Tobacco Sales, Illegal
Third Violation within 36
months
$2,000.00 plus 7 day license
suspension
Tobacco Sales, Illegal
Fourth Violation within 36
months
License revocation
Candidate Filing Fee
$2.00
Insufficient Funds/
Returned Check Fee
$35.00
Rental Registration/Renewal Fee
$45.00 per rental unit
Rental Renewal Late Fee
For renewals received after
January 31
$90.00 per rental unit
Residential Contractor License
Check
$5.00
Business Subsidy Application Fee
Required to reimburse City
for full cost of review
$2,100.00 + $10,500.00 escrow
Council Approved Abatement
Administrative Fee
$340.00
Night Time Construction Activity
Waiver
Per Waiver Application
$263.00340.00
XII. False Alarm Fees
False Alarm
First two alarms
No charge + letter
False Alarm
Three through ten alarms
$100.00 per alarm
False Alarm
Over ten alarms
$300.00 per alarm
XIII. Investigation Fees
Tobacco, Liquor, Charitable
Gambling, & Solicitor's Permits
$158.00
XIV. Utility Use Charges
Water Per Quarter:
Meter Charge
3/4" Meter Size or Smaller
$44-.6946.48
Meter Charge
1" Meter Size
$444—.7-2116.19
Meter Charge
1.5" Meter Size
$223 45232.39
Page 12 of X
Meter Charge
2" Meter Size
$357-.50371.80
Meter Charge
3" Meter Size
$670.34697.15
Meter Charge
4" Meter Size
$1,117241,161.93
Meter Charge
6" Meter Size
$2,234.42,323.86
Meter Charge
8" Meter Size
$3,5 75. �63,718.17
Meter Charge
10" Meter Size
$5,139. 05,344.87
Meter Charge
12" Meter Size
$9,609.
Consumption: 1-10,000 gals.
gallons
$3-.-4&3.70per 1,000 gallons (pro-
rated)
Consumption: 10,001-35,000
gallons
$4.594.76 per 1,000 gallons (pro -
gals.
rated)
Consumption: Over 35,000 gals.
gallons
$54-08.42 per 1,000 gallons (pro-
rated)
Water Test
Fee et by MN State Health
$2:43-3.81per quarter
Dept
Sanitary Sewer Per Quarter:
Base Charge - All Users
per unit (with the exception of
$72.9975.18
mobile homes
Usage per gals. -Single
gallons
$7-.5-27.75 (per 1,000 gallons)
Family/Multiple Family
Sanitary Sewer - Commercial
gallons
$7-.J�27.75 (per 1,000 gallons)
Apartment/Condominium
Sanitary Sewer - Mobile Home
per unit
$189.79195.48
A Winter Averaging minimum will be set using a standard usage of 100 gallons per day based on a 30-day
month: 100 gallons x 30 days x 3 months = 9,000 gallons per quarter. For April to December quarterly
sewer billings, residential usage will be based on the lesser of actual consumption or 9,000 gallons for those
customers that were assigned the minimum amount. Customers that have a Winter Average amount greater
than 9,000 gallons will be billed on the lesser of actual consumption or their Winter Average consumption.
Customers not connected to City water will be billed on 9,000 gallons each quarter.
Surface Water Per Quarter:
Residential - Single Family
per lot
$4-7-.418.98
Residential - Multiple Family
per dwelling
$23-.2-324.62
Apartment / Condominium
per acre
$155.00
Industrial / Commercial
per acre
$229.-34242.01
Undeveloped
per acre
N/A
Standby Per Quarter:
Standby 1" Service Line or smaller $10.41
Violation of Water or Sewer Use Restrictions:
Non -essential usage charge
$300 per day
XV. Recycling Fee
Per Residential Parcel with
Annual $99.00123.00
curbside recycling
Per Residential Parcel without Annual $3.75
curbside recycling
XVI. TTM Development
Page 13 of X
DRAFT SECTION V. PARKS AND RECREATION
Parks and Recreation
Security Deposit
Ball Field Tournaments
$300.00
Warming House Rental /
$300.00
Ice Rink Rental
Picnic Pavilions
$300.00
City Hall Rooms
$300.00
Refunds (Applies to all Parks & Recreation Rentals)
30+ days
$15 fee
lin advance of rental
14-29 days
50% refund
in advance of rental
0-13 days
No Refund
in advance of rental
Inclement Weather
Renters may reschedule their event
(Day of Event
for another day at no charge if the
No Refund
Determination Only)
City deems conditions make the
rental unsafe or unusable.
Ballfields Rental (Per 2 Hour Time Block)
Youth Athletic Associations are subject to the same refund and payment policies as all other
renters. All reserved dates are billable in full, regardless of use/non-use.
Youth Athletic
Association Field Rental
$45.00
— including Non -Profit
$60.00
Adult Club / Intramural
Field Rental
$125.00
Ball Field Rental,
Unlighted
Ball Field Rental,
$150.00
Lighted
Tournaments
Ball Field Tournament Fee includes on -site maintenance
Fee (Adult), staff for the full day.
$595.00
Full Maintenance
Ball Field Tournament Fee includes field preparation and
Fee (Adult), one midday field drag
$355.00
Minimum Maintenance
Ice Rink / Warming Houses (Non -Public Hours Only)
Warming House / Ice
$60.00
Rink
Picnic Shelters - Per Day (10 am - 10 pm)
Page 1 of X
Picnic Shelters —
$10.00
Resident
Picnic Shelters — Non-
$35.00
Resident
Picnic Pavillions - Perry & Cummings - Per Day (10 am -10 pm)
Picnic Pavilions —
$140.00
Resident
Picnic Pavilions — Non-
$225.00
Resident
Picnic Pavilions —
$95.00
Resident Non -Profit
Picnic Pavilions — Other
$125.00
Non -Profit
Community Gardens
Community Garden Plot
$60.00
- One Plot
Community Garden Plot
$30.00
- Second Plot
City Hall Business Hours Rental - Community Room
Resident Non -Profit
$100.00
Resident For Profit
$135.00
Non -Resident Non- $145.00
Profit
Non -Resident For Profit $175.00
City Government or
$0.00
Army National Gaurd
City Hall Business Hours Rental - Small Conference Room
Resident Non -Profit
$55.00
Resident For Profit
$65.00
Non -Resident Non-
$80.00
Profit
Non -Resident For Profit
$90.00
City Government or
$0.00
Army National Gaurd
City Hall Non- Business Hours Rental - Community Room or Small Conference Room
Scheduling outside regular hours is subject to staff availability. The City may deny requests if
staff are unavailable.
Resident Non -Profit
$215.00
Resident For Profit
$225.00
Non -Resident Non-
$235.00
Profit
Page 2 of X
Non -Resident For Profit
City Government or
Army National Gaurd
City Hall Room Rental Add Ons
Equipment Rental —
DVD, VCR, T.V.
$250.00
$215.00
$25.00
Page 3 of X
MINNESOTA STATUTES 2025 326B.148
326B.148 SURCHARGE.
Subdivision 1. Computation. To defray the costs of administering sections 326B.101 to 326B.194, a
surcharge is imposed on all permits issued by municipalities in connection with the construction of or addition
or alteration to buildings and equipment or appurtenances after June 30, 1971. The commissioner may use
any surplus in surcharge receipts to award grants for code research and development and education.
If the fee for the permit issued is fixed in amount the surcharge is equivalent to one-half mill (.0005) of
the fee or $1, except that effective July 1, 2010, until June 30, 2015, the permit surcharge is equivalent to
one-half mill (.0005) of the fee or $5, whichever amount is greater. For all other permits, the surcharge is
as follows:
(1) if the valuation of the structure, addition, or alteration is $1,000,000 or less, the surcharge is equivalent
to one-half mill (.0005) of the valuation of the structure, addition, or alteration;
(2) if the valuation is greater than $1,000,000, the surcharge is $500 plus two -fifths mill (.0004) of the
value between $1,000,000 and $2,000,000;
(3) if the valuation is greater than $2,000,000, the surcharge is $900 plus three -tenths mill (.0003) of
the value between $2,000,000 and $3,000,000;
(4) if the valuation is greater than $3,000,000, the surcharge is $1,200 plus one -fifth mill (.0002) of the
value between $3,000,000 and $4,000,000;
(5) if the valuation is greater than $4,000,000, the surcharge is $1,400 plus one -tenth mill (.0001) of the
value between $4,000,000 and $5,000,000; and
(6) if the valuation exceeds $5,000,000, the surcharge is $1,500 plus one -twentieth mill (.00005) of the
value that exceeds $5,000,000.
Subd. 2. Collection and reports. All permit surcharges must be collected by each municipality and a
portion of them remitted to the state. Each municipality having a population greater than 20,000 people shall
prepare and submit to the commissioner once a month a report of fees and surcharges on fees collected
during the previous month but shall retain the greater of two percent or that amount collected up to $25 to
apply against the administrative expenses the municipality incurs in collecting the surcharges. All other
municipalities shall submit the report and surcharges on fees once a quarter but shall retain the greater of
four percent or that amount collected up to $25 to apply against the administrative expenses the municipalities
incur in collecting the surcharges. The report, which must be in a form prescribed by the commissioner,
must be submitted together with a remittance covering the surcharges collected by the 15th day following
the month or quarter in which the surcharges are collected.
A municipality that fails to report or submit the required remittance to the department in accordance
with this subdivision is subject to the remedies provided by section 326B.082.
Subd. 3. Revenue to equal costs. Revenue received from the surcharge imposed in subdivision 1 should
approximately equal the cost, including the overhead cost, of administering sections 326B.101 to 326B.194.
History: 1984 c 544 s 75; ISp1985 c 13 s 127, 1989 c 303 s 1; 1989 c 335 art 4 s 11; 1991 c 2 art 7 s
5; 1994 c 634 art 2 s 7, 1995 c 254 art 2 s 13; 1997 c 202 art 2 s 26; ISp2001 c 10 art 2 s 31; 2002 c 317
s 2; 2007 c 135 art 2 s 5; 2007 c 140 art 4 s 13,61; art 13 s 4; 2009 c 101 art 2 s 109; 2010 c 215 art 8 s
10; 2010 c 280 s 19,20; 1Sp2011 c4art 3s8; 2012c289s5
Official Publication of the State of Minnesota
Revisor of Statutes
MINNESOTA STATUTES 2025 326B.153
326B.153 BUILDING PERMIT FEES.
Subdivision 1. Building permits. (a) Fees for building permits submitted as required in section 326B.107
include:
(1) the fee as set forth in the fee schedule in paragraph (b) or as adopted by a municipality; and
(2) the surcharge required by section 326B.148.
(b) The total valuation and fee schedule is:
(1) $1 to $500, $29.50;
(2) $501 to $2,000, $28 for the first $500 plus $3.70 for each additional $100 or fraction thereof, to and
including $2,000;
(3) $2,001 to $25,000, $83.50 for the first $2,000 plus $16.55 for each additional $1,000 or fraction
thereof, to and including $25,000;
(4) $25,001 to $50,000, $464.15 for the first $25,000 plus $12 for each additional $1,000 or fraction
thereof, to and including $50,000;
(5) $50,001 to $100,000, $764.15 for the first $50,000 plus $8.45 for each additional $1,000 or fraction
thereof, to and including $100,000;
(6) $100,001 to $500,000, $1,186.65 for the first $100,000 plus $6.75 for each additional $1,000 or
fraction thereof, to and including $500,000;
(7) $500,001 to $1,000,000, $3,886.65 for the first $500,000 plus $5.50 for each additional $1,000 or
fraction thereof, to and including $1,000,000; and
(8) $1,000,001 and up, $6,636.65 for the first $1,000,000 plus $4.50 for each additional $1,000 or fraction
thereof.
(c) Other inspections and fees are:
(1) inspections outside of normal business hours (minimum charge two hours), $63.25 per hour;
(2) reinspection fees, $63.25 per hour;
(3) inspections for which no fee is specifically indicated (minimum charge one-half hour), $63.25 per
hour; and
(4) additional plan review required by changes, additions, or revisions to approved plans (minimum
charge one-half hour), $63.25 per hour.
(d) If the actual hourly cost to the jurisdiction under paragraph (c) is greater than $63.25, then the greater
rate shall be paid. Hourly cost includes supervision, overhead, equipment, hourly wages, and fringe benefits
of the employees involved.
Subd. 2. Plan review. Fees for the review of building plans, specifications, and related documents
submitted as required by section 32613.106 must be paid based on 65 percent of the building permit fee
required in subdivision 1.
Official Publication of the State of Minnesota
Revisor of Statutes
326B.153 MINNESOTA STATUTES 2025
Subd. 3. Surcharge. Surcharge fees are required for permits issued on all buildings including public
buildings and state licensed facilities as required by section 326B.148.
Subd. 4. Distribution. (a) This subdivision establishes the fee distribution between the state and
municipalities contracting for plan review and inspection of public buildings and state licensed facilities.
(b) If plan review and inspection services are provided by the state building official, all fees for those
services must be remitted to the state.
(c) If plan review services are provided by the state building official and inspection services are provided
by a contracting municipality:
(1) the state shall charge 75 percent of the plan review fee required by the state's fee schedule in
subdivision 2; and
(2) the municipality shall charge 25 percent of the plan review fee required by the municipality's adopted
fee schedule, for orientation to the plans, in addition to the permit and other customary fees charged by the
municipality.
(d) If plan review and inspection services are provided by the contracting municipality, all fees for those
services must be remitted to the municipality in accordance with their adopted fee schedule.
History: 2009 c 78 art 5 s H; 2017 c 94 art 2 s 5
Official Publication of the State of Minnesota
Revisor of Statutes
EXHIBIT
RESIDENTIAL ELECTRICAL PERMIT FEES (SINGLE FAMILY HOMES, APARTMEN ,
ASSISTED LIVING, and CONDOMINIUMS) Effective: 1/1/2026
HOMEOWNERS AND CONTRACTORS: Complete an electrical permit form available from the Building Inspections
Division. Add $1.00 for State surcharge to total cost of each permit. The fee is the total of the listed fees or the total number
of inspection trips x $50.00($60.00), whichever is greater.
Residential panel replacement is $110.00 ($125.00), sub
panel $50.00 ($75.00). New service or power supply is:
0 to 300 Amp $55.00 ($75.00)
400 Amp $71.00 ($100.00)
Add $16.00 ($25.00) for each additional 100
amps
Minimum Fee:
Minimum permit fee is $50.00 ($60.00) plus
$1.00 State surcharge. This is for one
inspection only.
Minimum fee for rough -in and final inspection is
$100.00 ($120.00) plus $1.00 State surcharge.
Apartment Buildings
Circuits and Feeders
0-100 Amp $9.00 ($12.00)
101-200Amp $15.00($20.00
Add $6.00 ($10.00) for each additional 100 amps
Maximum Fee: (Dwelling Fees:)
Fee for single family dwelling or
townhouse not over 200 amps (and up to
25 circuits)(Additional circuits are
$12.00/ea) (Ne may, if
200AFRps)is $200.00 plus(is $225.00
plus)
$1.00 State surcharge. Maximum of 2 rough-in's and 1 final
inspection. (Failed inspections are an additional $50.00
each)($60.00/each)
Fee per unit of an apartment or condominium complex is $90.00
($110.00). This does not cover service, unit feeders or house
panels, (and includes up to 15 circuits per unit)
Swimming Pools and Hot Tubs Additions,
Remodels or Basement Finishes
Residential Accessory Structures
Street and Parking Lot Lights
Transformers and Generators
Retrofit Lighting
Sinn Transformer or DFiyer
Low voltage fire alarm, low voltage
heating and air conditioning control wiring
Residing jobs
Re -Inspection Fee in addition
to all other fees
$100.00 ($120.00) plus circuits at $9.00/each ($12.00/each). This
includes 2 inspections.
$100.00 ($120.00) this include up to 10 circuits and 2 inspections
The Greater of $55.00($75.00) for panel plus $9.00($12.00) per
circuit or $100($120.00) for 2 inspections.
$5.00($10.00) per each standard
$5 up to 10kva, $45($55)11 to 74kva, $60($70) 75kva to 299kva,
over 299kva is $165($175)
$0.85 cents($1.00) per fixture
$1.00 per device
$50 ($60.00)
$50.00($60.00)
Solar fees:
Okw to 5kw = $90($100) 5.1 kw to 10kw = $150($165)
10.1 kw to 20kw = $225($245) 20.1 kw to 30kw = $300($330)
30.1 kw to 40kw = $375($410) 40.1 kw and larger is $375($410) plus $25 for each additional 10kw
Electronic inspection fee for these items only; furnace, air conditioning, bath fan, fireplace or receptacle for water
heater vent is $40.
Refunds must be requested in writing. No refunds unless more than the minimum fee. Refunds are minus the cities handling fee.
THE PERMIT FEE IS DOUBLED IF THE WORK STARTS BEFORE THE PERMIT IS ISSUED.
Minimum fee permits expire in 6 months.
Permits over the minimum fee and up to $250($1,000) expire in 1 year.
Commercial Electrical Permit:
Effective: 1/1/26
$50 ($60) per trip or the fees below, whichever is greater — Solar fees are the same as residential solar
fees
Description Fee Calculation
Permit Fee
Valuation $1 to $1,000 $50.00 ($60.00) Per trip
Valuation $1,001 to $2,000 $50.00 ($60.00) for the first $1,000 plus
$3.25 for each additional $100 or
fraction thereof, to and including $2,000
Valuation $2,001 to $25,000 $82.00 for the first $2,000 plus $14.85 for
each additional $1,000 or fraction
thereof, to and including $25,000
Valuation $25,001 to $50,000 $423.55 for the first $25,000 plus $10.70
for each additional $1,000 or fraction
thereof, to and including $50,000
Valuation $50,001 to $100,000 $691.05 for the first $50,000 plus $7.45
for each additional $1,000 or fraction
thereof, to and including $100,000
Valuation $100,001 to $500,000 $1,063.55 for the first $100,000 plus $6
for each additional $1,000 or fraction
thereof, to and including $500,000
Valuation $500,001 to $1,000,000 $3,463.55 for the first $500,000 plus $5.10
for each additional $1,000 or fraction
thereof, to and including $1,000,000
Valuation $1,000,001 and up $6,013.55 for the first $1,000,000 plus $4
for each additional $1,000 or fraction thereof
Reinspection fee (in addition to all other fees) $50.00 ($60.00)
Investigative fee (working without permit) the fee is doubled
Refunds issued only for permits over: $100.00 ($120.00)
State Surcharge is .0005 times the project value: $
Total Permit Fee Submitted: $
Minimum fee permits expire in 6 months. Permits over the minimum fee and up to $250.00 ($1,000) expire in 12 months from the
filing date. A service charge of $35.00 will be added for all dishonored checks.
AGENDA ITEM - 3D
'It
-fiRPEN HILLS
MEMORANDUM
DATE: November 10, 2025
TO: Honorable Mayor and City Councilmembers
FROM: Jessica Jagoe, City Administrator
SUBJECT: Work Session Discussion Topics
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
For Council Consideration
Council should discuss and provide further direction on work session discussion topics for future
agenda planning.
Background
The following are several work session agenda topics that are scheduled to be brought forward to
City Council for discussion and/or include a staff recommendation. City staff is seeking direction
on the next steps with these work session agenda topics. Additionally, Council is asked to provide
additional context for the intended purpose of each discussion topic to make sure we are
researching and achieving the desired outcome.
Committee Commission Goal Setting — Staff Recommendation
The January 8, 2024, work session included a formal memo for Work Session Priorities which had
this item as a future agenda topic. No additional detail was listed. From the January 3, 2024,
minutes for the Council LMCIT Collaboration Services, there is reference to committee
commission reports, separate from Council updates.
Committee Commission Membership — Staff Recommendation
The January 8, 2024, work session included a formal memo for Work Session Priorities which had
this item as a future agenda topic. No additional detail was listed.
Committee Commission Liaison Role Policy — Council WS
Background included as Attachment A. Meeting minutes say this item will be addressed as part of
a future work session and it was added to the agenda planning list on April 22, 2024.
Page 1 of 2
Approved Policy Discussion — Staff Recommendation
Added to the agenda planning list on June 24, 2024. Staff cannot recall specifically what this topic
would involve. In review of the meeting minutes from months prior, staff found references to
various policies and how those are approved by the Council. Council should provide clarification
on what this discussion topic relates to.
Budget Impact
N/A
Attachment
Attachment A April 2024 Memo
Page 2 of 2
Attachment A
-ALI�)EN_ HILLS
MEMORANDUM
DATE: April 8, 2024
TO: Honorable Mayor and City Councilmembers
FROM: Dave Perrault, City Administrator
SUBJECT: Committee/Commission Liaison Roles and Responsibilities
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
Council should discuss the role of the Committee/Commission Liaisons.
Background
As part of the earlier LMCIT discussion, Council requested to discuss the roles and
responsibilities of Council Liaisons. The role of the liaison has not been formally discussed in
the past, below is the applicable ordinance that pertains to the liaisons.
Subd. 14 Council Liaison. The City Council shall appoint a council member to serve as a
liaison to each Board, Committee, Commission or other Appointed Body.
Council may want to discuss how it defines the liaison role, possible expectations and if a formal
policy needs to be approved and/or ordinance changes need to be made.
As part of the previous discussion, Council also discussed adding formal reports from Council
Liaisons to meeting agendas; however, this was put on hold pending a discussion on what the
expectations are regarding updates. Council may also want to discuss this and direct Staff on
moving forward.
Budget Impact
N/A
Attachment
N/A
Page 1 of 1
'It
-fiRQEN HILLS
MEMORANDUM
DATE: November 10, 2025
TO: Honorable Mayor and City Councilmembers
FROM: Jessica Jagoe, City Administrator
SUBJECT: Rice Creek Commons/TCAAP Discussion
Budgeted Amount:
N/A
For Council Consideration
Actual Amount:
N/A
AGENDA ITEM - 3E
Funding Source:
N/A
Council will have the opportunity to comment on any TCAAP related items they so choose.
Background
N/A
Budget Impact
N/A
Attachment
N/A
Page 1 of 1
AGENDA ITEM - 3F
'!Tt
-AII��EN_ HILLS
MEMORANDUM
DATE: November 10, 2025
TO: Honorable Mayor and City Councilmembers
FROM: Jessica Jagoe, City Administrator
SUBJECT: Agenda Planning
Budgeted Amount: Actual Amount: Funding Source:
N/A N/A N/A
Council Should Consider
Council should discuss its next Work Session agenda.
Background
Per Council's adopted policy on agenda setting, please find the proposed agenda below for the
upcoming meeting.
November 24th Work Session
• To Be Determined
• Agenda Planning (time sensitive)
• RCC/TCAAP Discussion
December 8th Work Session
• 2026 PMP
Parks System Plan Discussion
Agenda Planning (time sensitive)
RCC/TCAAP Discussion
Attachment A is the list of topics that have yet to be discussed by Council and the 2025 ranking
of priority topics. Staff will begin to work the higher priority items into upcoming Work
Sessions sooner while putting the lower priority items to later discussions. Please note, this does
not reflect all items at Work Sessions as Staff will have necessary items for discussion, such as,
budget discussions, concept plan reviews, or Public Works projects that need timely direction.
Council may want to discuss whether any items need to be added to this list for future discussion
or assign a future meeting for some of these items. This would need to be done by a majority
consensus of Council.
Page 1 of 2
Below is a running list of things Staff brings forward to Work Session annually, in recent years,
we have shifted away from bringing some items forward unless needed, such as, the Pavement
Management Update from Public Works. Note, these timelines may shift year to year. Most
items discussed at Work Sessions are one-off items that may require multiple meetings but are
usually not recurring.
• January
o Legislative priorities
• February
o None
• March
o Initial guidance on next year's Public Works projects
• April
o None
• May
o None
• June
o Follow up on next year's Public Works projects
• July
o Capital improvement planning
• August
o Operating budgets
• September
o Operating budget and levy discussion
• October
o State of the City (if planned for early following year)
• November
o City-wide budget and fee schedule
o Follow up on next year's Public Works projects
• December
o Committee and commission appointments
Budget Impact
N/A
A ffnr hmnnt
Attachment A: Council Priorities
Attachment B: Agenda Setting Policy
Page 2 of 2
Attachment A
Topic for Consideration
Short-term Rental Ordinance
Likely Responsible Department
CD/Admin
Total
15
Av era e
3.00
Ma ority Next Steps
Council WS
Rental Licensing Program
CD/Admin
15
3.00
Council WS
Accessory Dwelling Units
CD
12
2.40
Council WS
Funding for Lake Johanna Boulevard Trail
pW/Fin
9
1.80
Council WS
Climate Action Plan
Admin
9
1.80
Council WS
Code of Conduct
Admin
8
1.60
Council WS
Encroachment Discussion (2025)/Adopt A Spot
PW
8
1.60
Staff Recommendation
Volunteer Recognition (to Personnel first)
Admin
8
1.60
Staff Recommendation
Cannabis Discussion
CD/Admin
8
1.60
Council WS
Committee Commission Goal Setting
Admin
7
1.40
Staff Recommendation
Energy Audit
Admin
7
1.40
Staff Recommendation
Temporary Goats/Buckthorn
Admin
7
1.40
Staff Recommendation
Buy Nothing Day/Clean Up Day
Admin
6
1.20
Staff Recommendation
Community Survey
Admin
6
1.20
Council WS
Committee/Commission Liaison Role Policy
Admin
5
1.00
Council WS
EV Fleet Analysis
pW
5
1.00
Staff Recommendation
Committee/Commission Membership
Admin
4
0.80
Staff Recommendation
Approved Policy Discussion
Admin
4
0.80
Staff Recommendation
Attachment B
It
EN HILLS
CITY OF ARDEN HILLS
Agenda Setting Policy
The purpose of this policy is to establish a method for agenda setting that allows for Council to
review and have control over its agendas and decide as a Council how it wants items for
consideration to be brought forward.
For regular worksession agendas:
• Prior to concluding each regularly scheduled worksession, the City Council shall review
its next regularly scheduled worksession agenda and direct Staff on any changes.
• Should an individual Councilmember want to raise an item for discussion at the next
meeting or in the future, they would do so during this review period. The item would
need at least one other Councilmember to agree to having the item considered for future
discussion, and then Council, by majority, would direct to have it placed on a future
agenda or not.
Staff will have flexibility to add or remove items to the worksession as needed to
maintain operational efficacy.
For regular City Council meeting agendas:
• Agendas will be largely Staff driven based on approvals needed for normal operations.
• Items coming from the City Council shall first be discussed at a worksession and can
direct Staff at said worksession to bring items forward for formal approval if needed.
• In rare instances, if a Councilmember brings forward an item that needs approval prior to
going to a worksession, they may request the City Administrator add the item to the
agenda. The City Administrator shall have the discretion to determine if the issue should
be added or not, but Councilmembers will make every effort to having the item first
discussed at a worksession.
Special meetings and emergency meetings:
• Special meetings and emergency meetings may still be called at the discretion of the
Mayor or any two Councilmembers, and the members calling the meeting shall set the
agenda.