HomeMy WebLinkAboutCC 05-21-1990
'II
MINUI'ES OF THE ARDEN HILlS OJUNCIL w::JRKSESSION
MONDAY, MAY 21, 1990, 4:30 P.M. - CITY HALL
CALL ill ORDER
Pursuant to due call and notice thereof, Mayor Sather
called the meeting to order at 4:30 p.m.
.
ROLL CALL The roll being called the fOllowing members were present:
Mayor Thomas Sather, eouncilrnembers Nancy Hansen, Paul
Malone and JaIInn Growe. Absent: eouncillrember Thomas Mahowald. Also present: Park
Director John Buckley, Public Works SUpervisor Dan Winkel, Clerk Administrator
Gary Berger and Deputy Clerk Catherine rago.
KEM MIILING;
WELL ABlINDONMENI'
Mayor Sather referred Council to the well abandonment
discussion continued from the 5-14-90 Council meeting.
Clerk Administrator Berger explained Paul Goudreault and DaJ:rel Ohman, Delta
Environmental Consultants, and John Gilbertson, Bergerson-Caswell, were present
to discuss the chan;Je order suhnitted for well abandornnent at the Kern Milling
site.
Paul Goudreault reviewed well abandornnent operations to date, and current
conditions of wells #3 and #4. He noted there was little information available on
wells #3 and #4 when the bid specifications were corrq::>iled. Goudreault explained
the contractor not only found the wells to I:e deeper than initially estlinated,
but also found sand in the l:ottom of the wells which will have to be cleaned-out
before proper abandornnent can occur.
Mayor Sather questioned the exact cost for abandornnent of wells #3 and #4.
.
Goudreault estlinated the cost for abandornnent of the four wells at $6,000.00
each; total of approximately $24,000.00.
John GiJ..ber+c.Son, representing Bergerson-Caswell, stated he has prepared a cost
estimate for the additional work on wells #3 and #4 to accomplish proper
abandornnent.
There was discussion relative to the differential in the bids received and why
two of the bidders quoted higher costs for the abandornnent of the four wells.
councilrnernber Hansen commented that most residential wells in this area are
deeper than the estimated depth listed in the bid specifications.
councilrnernber Malone noted that Delta was hired to prepare specification and
receive bids and the chan;Je order represents an allnost 100% in=ease over the
original bid quote. He also noted that Delta is ncM requesting additional fees
for services which it appears were outlined in their original contract.
Goudreault sta.ted that the scope of services have chan;Jed from the original
contract entered into with the City; additional services include attendance at
meetings, contacting Public Health Services to determine if steps could be
eliminated in the state requirements for abandornnent which would save the City
money.
.
Mayor Sather suggested the contractor, Delta Envirornnental and the City share the
cost overage in the chan;Je order and additional fees charged by Delta for
expanded services.
Gilbertson explained it is difficult for a =ntractor to suhnit a bid quote which
includes all conditions which could exist; noted he did not expect to find sand
in wells #3 and #4 and the depth of the wells is still undetennined until the
sand is removed. He suggested charging the City on a "time and lMterials" basis,
not to exceed the chan;Je order amount.
..
Minutes of the Arden Hills Council Worksession, 5-21-90
Page 2
KEM MILLING (Cont'd)
Goudreault advised the scope of work outlined by Delta in
their bid quote for services has expanded beyond the
items listed.
.
Clerk Administrator Berger reported that Delta representatives appear to be
acting on behalf of the contractor, rather than the city. He noted that Delta
representatives should be aggressively acting on behalf of the city to keep
change orders to a minimum.
Mayor Sather suggested the representatives from Delta and Bergerson-caswell take
a brief intermission to discuss the proposed cost-sharing or other alternatives
for later discussion.
Council was referred to a memorandum from the Clerk
Administrator dated 5-17-90, relative to reference
checks on firnls proposing to, conduct the citizen survey.,
Council generally con=e:1 that Decision Resources has had experience workin3'
with municipal government surveys, the costs are reasonable and references are
excellent.
HIRE FIRM;
cmZEN SURVEY
Councillnember Hansen commented the survey is costs are too high and the funds are
not budgeted for this purpose; reporte:1 the Public Safety/Works Committee
generally agreed with her comments after reviewing the inforrration suhnitted.
.
Council con=e:1 to retain Decision Resources to conduct a telephone survey and
to place this matter on the Council Agenda for the May 29 meeting. It was further
detennine:1 that council1nernbers and staff be prepared to suhnit recommendations
for persons to work with the finn to coopile the survey questionnaire at the
5-29~90 meeting, and that staff research funding for the project on an e::{Ual
sharing basis between the following areas of the OOdget: Administration, Public
Works, Parks, Council and utilities funds.
TCAAP LEITER;
PLAN cx::MMISSION
Slll3CXMMITI'EE
Council was referred to a letter drafted by Planning
Commission member Ray Mo3raw, regarding the Arsenal
study Planning SUbconnnittee recormnendations.
McGraw was present and briefly discussed the subcommittee activities and
co=espondence from legislators relating to the TCl\AP site.
McGraw advised that state Statute 477A. relates to financial funding for use of
land as parks; questioned if funding would apply to government facilities of this
nature.
McGraw advised the Planning Comrnission strongly encouraged the Council to take
necessary action to insure that Arden Hills has the right of first refusal to
land now occupied by TCl\AP, in the event the land is released by the Federal
goverrnnent.
.
After discussion, Council con=e:1 to direct the city Attorney to research state
statute 477A and determine if a request for funding will apply to a facility of
this nature and, if the statute applies, determine a methcd for obtaining the
funding. Council requested staff to report to Planning Commission and Council on
this matter. It was further agreed by Council that a dialcgue should be
established with Legislators, particularly Bruce Vento, regarding this matter.
Council thanked MO:;raw and the members of the subcommittee for their efforts.
.
.
.
~
Minutes of the Arden Hills Council Worksession, 5-21-90
Page 3
KEM MIlUNG;
O1ANGE ORDER
Council reconvened for discussion on the Kern Milling
site change order request from Bergerson-caswell for
well abaOOonment.
Paul Gouderault and John Gilbertson proposed additional funding be authorized by
Council in an amount not to exceed $8,000.00 and the entire well abaOOornnent
project would be billed on a t:ilne and materials basis. It was also suggested that
Delta Envirornnental will provide oversight for the well abaOOonment at no
additional =nsulting cost to the city, other than the costs originally outlined
in the scope of work for the project.
Council concurred with the recommenclation and requested Delta subnit a letter,
outlining the above terms, and staff was directed to place this matter on the
Consent Agenda for the Regular Council meeting held 5-29-90. Council requested
Delta representatives review the t:ilne and material invoices sul:rnitted from
Bergerson-caswell for all work at the site and provide the Council with a
summary .
NEIGHBORHOOD MI'G;
STOWE AVE/KATIE
IANE, EASEMENTS
Clerk Administrator Berger subnitted a "draft" agenda
for the Neighl:orhood Meeting scheduled on May 31, to
discuss the easement en=oachments on Katie lane and
stowe Avenue, for Council review and comment.
Public Works Supervisor Winkel advised he will give a visual presentation of the
easement en=oachments and discuss rnethcds of elbninating the problems.
Council suggested Winkel also explain the necessity for "preventive maintenance"
to residents.
It was also suggested that Attorney Filla be present at the meeting.
Council concurred to invite Attorney Filla to attend the NeighJ:x:>rhood Meeting, to
direct staff to detennine a plan for elbnination of en=oachments after the
meeting, and to schedule a follow-up meeting with residents within 60 days to
discuss those en=oachments which need to be removed irmnediately and provide a
timetable for removal of renaining encroachments.
Council further directed Public Works Supervisor Winkel to have employees mark
the easement along the rear property lines in this area a few days prior to the
meeting in order for residents to view the en=oachments.
aJUNCIL CU1MENTS
BUSSARD COURI';
EASEMENT PROBJ;..EM
Councilrnember Growe questioned the status of the Bussard
Court easement en=oachrnent.
Clerk Administrator Berger advised Engineer Maurer is reviewing the situation.
UPDATE; CITY HALL
<XM1ITI'EE MEETING
Councilrnember Malone reported on the City Hall Cormnittee
and reviewed the agendas for upcoming meetings.
REPORr; FLOWER
POWER CAMPAIGN
BREi\KFASI'
Mayor Sather reported on the "Flower Power" campaign
breakfast and explained there was a good turnout for
the breakfast, however, the plantings were not completed
due to weather conditions.
.
.
.
Minutes of the Arden Hills Council Worksession, 5-21-90
Page 4
EMPIDYEE/OJUNCIL Mayor Sather recommended staff, COlU1Cil and their
PICNIC families consider scheduling a picnic on the evening of
the regular worksessioni suggested this would be a nice
break from the heavy worksession schedule maintained throughout the year.
Park Director Buckley volilllteered to work on scheduling the picnic.
Council1nember Hansen recalled the Finance Committee was to report to Council on
the proposed assessment policy at the Jillle worksession :meeting.
NOl'ICEi TRAIL
IMPROVEMENTS
Park Director Buckley distributed the letter which will
be sent to residents regarding the Trail IIrprovements
scheduled for this sununer.
Clerk Administrator Berger reported on the :meeting
between City staff, Commander Bergeron, Fire Chief
Winkel, Attorney Filla and Anny representatives regarding
proposed police/fire services at the training facility =ently under
=nstruction at Lexington Avenue and Highway 96.
ARMY RESERVE OITRi
POLICE/FIRE SERVICES
ADJOURN
Growe moved, seconded by Malone, that the :meeting be
adjourned at 6:45 p.m. Motion carried unan:i.rrDusly. (4-0)
Gary ~!erg~
Clerk Administrator
'U1arnasR.Sather
Mayor