Loading...
HomeMy WebLinkAboutCCP 09-08-1997 I FILE I AGENDA ,. ARDEN HILLS CITY COUNCIL MEETING NEW BRIGHTON COUNCIL CHAMBERS I MONDAY, SEPTEMBER 8,1997,7:30 P.M. I 7:30 P.M. 1. Call to Order I 7:30 P.M. 2. Approval of Meeting Agenda 7:30 P.M. 3. Approval of Minutes I a. August 25, 1997 Regular Council Meeting 7:30 P.M. 4. Consent Calendar I Those items listed under the Consent Calendar are considered to be routine by the City Council ~nd will be enacted by one motion under a Consent Calendar fannat. There will .be no separate discussion ofthese items, unless a Council member so requests, in which event, the item will be removed from the general order of business and considered separately in its normal sequence on the agenda. I a. Claims and Payroll b. Newsletter Committee Appointment Ie 7:35 P.M. 5. Public Comments This is an opportunity for citizens to bring to the Council's attention any items not currently on the agenda. I In addressing the Council, please state your name and address for the record, and a brief summary of the specific item being addressed to the Council. To allow adequate time for each person wishing to address the Council, we ask that individuals limit their comments to three (3) minutes. Written documents may be I distributed to the Council prior to the meeting, or as bench copies, to allow a more timely presentation. 7:40 P.M. 6. Unfinished and New Business I a. Res. #97-41, Clarifying Proposed Sums of Money to be Levied for Levy Year 1997, Payable in 1998 b, Res, #97-42, Adopting Truth-in-Taxation Hearing Dates and Location for I Proposed 1998 Taxes Payable .. .,.~. c. Res. #97-44, Adopting the Preliminary 1998 Budget d. Res. #97-43, Receiving Preliminary Feasibility Report, 1998 Street I Improvement Project e. Planning Case #95-16, Balfany Final Plat, Development Agreement f. Cummings Park, Trail Washout, Award Bid I 8:40 P.M. 7. Administrator Comments I 8:50 P.M. 8. Council Comments tI' 9:00 P.M. 9. Adjourn The above time may vary depending upon length of issue discussion. I ,. ~ . . ,;~ -....,.. . . .. I . I September Meetinvs October Meetings September 3 Planning Commission 7:30 P.M. October I Planning Commission 7:30 P.M. . September 8 Council i\feeling October 14 , 7:30 P.M. 7:30 P.M. Council Meeting I September 15 Council \\'orksession 4:45 P.M. Oclober 15 Business Development 8:00 A.M. Committee September 17 Business Development 8:00 A.M. I Comminee October 16 Finance Committee 7:30 P.M. September 18 Finance Comminee 7:30 P.M. October 16 Public Safety 7:30 P.M. tJ Commission September 18 Public Safety 7:30 P.M. Commission October 20 Business Relations 4:00 P.M. Committee I September 22 Joint \Vorksession PENDING (Arden Hills, Shoreview October 20 Council \Vorksession 4:45 P.M. and North Oaks) I October 27 Economic Development 7:00 P.M. September 23 Parks & Recreation 7:00 P.M. Authority I Commission October 27 Council Meeting 7:30 P.M. I September 24 Newslener Comminee 6:00 P.M. October 28 Parks & Recreation 7:00 P.M. September 24 Hwy. 96 Task Force 7:00 P.M. Commission I Septem ber 29 Economic Development 7:00 P.M. October 29 Newsletter Committee 6:00 P.M. Authority I October 29 Hv.'Y. 96 Task force 7:00 P.M. September 29 Councill\leeting 7:30 P.M. I I .. I I HP OfficeJet Fax Log Report for I Personal Printer/Fax/Copier City of Arden Hills 612 633-7839 I ~.t Fax Sep-05-97 03:27 PM I Identification Rcsult PaQcs In!!; Datc Time Duration DiaQ'nostic 6286833 OK 02/02 Scnt Se!>,05 03:16P 00:01:01 002121230020 I 6449446 OK 02/02 Scnt Sc!>,05 03:24P 00:01:11 002121430020 6339550 OK 02/02 Sent Sep-05 03:18P 00:01:14 002120430020 6333846 OK 02/02 Sent Scp-D5 03:20P 00:01: 15 002120430020 I 4810551 OK 02/02 Sent Sep~05 03:21P 00:00:51 002521030022 ~.O.4 I I I I, I I I I I I I r- I I HP OfficeJet Fax Log Report for I Personal Printer/Fax/Copier City of Arden Hills 612 633-7839 I tlt Fax Sep-05-97 03 :05 PM I Identification . '^"....,-' Result Pa~es ~ Date Time Duration Dia[ffiostic " , ~ 6461220 L?'O OK 03 &'Tll Sep-05 03:03P 00:01:05 002581030022 I 6.0.4 ~ ti--Jc;- . _'1<; \ \ I (j) ~?-\ I I I I. I I I I I I I Ie I I I CITY OF ARDEN HILLS ~ MEMORANDUM DATE: September 5,1997 I TO: M,y" "il City C,,",il ~ I FROM: Brian Fritsinger, City Administrat r SUBJECT: Administrator Comments for the September 8,1997 Council Meeting I 1. Approval of Minutes The Council is asked to approve the Minutes of the August 25,1997 Regular Council I meeting. '" 2. Consent Calendar ~ I a. Claims and Payroll I The Council is asked to approve claims in the amount of$I92,646.27, and payroll for the period most recently ended. The Council should note payment to MCES in the amount of $48,322 for September sewer charges and $40,441.50 for July Ie SAC charges; and to Ramsey County in the amount of $49,309 for September law enforcement. I b. Newsletter Committee Appointment The City Council is asked to appoint Sharon Hanzalik to the Newsletter Committee. I 3. Unfinished and New Business I a. Res. #97-41. ClariJYinl! Proposed Sums of Money to be Levied for Levy Year 1997. Payable in 1998 I The City Council is asked to adopt Resolution #97-41, clarifying proposed sums of money to be levied for levy year 1998. This motion would adopt the preliminary levy of$I,864,320, which is a 1.91% increase, or $35,000, from the I payable 1997 levy. b. Res. #97-42. Adopting Truth-In-Taxation Hearing Dates and Location for I Proposed 1998 Taxes Pavable The City Council is asked to adopt Resolution #97-42, adopting Truth in Taxation hearing dates for proposed 1998 taxes payable, The initial Truth in Taxation I hearing is scheduled for December 4, 1997, with the continuation hearing scheduled for December 11, and the final hearing scheduled for December 15, .. 1997. Each of these meetings is scheduled for the Army Reserve Center at 7:30 p.m. I -- ---...------ - -- ------..--- I Administrator Comments for the 9/8/97 Council Meeting I Page Two September 5,1997 .. e. Res. #97-44. Adopting the Preliminary 1998 Budl!et The City Council is asked to adopt Resolution #97-44, adopting the preliminary I 1998 budget. The preliminary budget for 1998 is required to be adopted by September 15, 1997. However, whereas the adopted levy cannot increase once adopted, the preliminary budget is not subject to these same restrictions. I d. Res. #97-43. Recciving Preliminary Feasibilitv Report. 1998 Street Improvement Project I The City Council is asked to adopt Resolution #97-43, receiving the Preliminary Feasibility Report for the 1998 Street Improvement Project. Hearings have not been scheduled, pending final review and selection of an engineering firm for I 1998. , e. Planning Case #95-16. Balfanv Final Plat. Development Al:reement I The City Council is asked to approve the Pinal Plat related to Planning Case #95- 16, Balfany Development Company, and the Development Agreement for the construction of public improvements in the form of the road and utilities. I f. Cummings Park. Trail Washout. Award Bid (Disaster Relief Funds) The City Council is asked to award the bid for the completion of the Cummings ~ Park Trail washout project to Rehbein Construction, with an apparent low bid of $30,905. This project will be started immediately with completion targeted for I around October 1,1997. BF/sls I I I I I I .. I I' , ~ ~~~y MINUTES I CITY OF ARDEN HILLS, MINNESOTA REGULAR CITY COUNCIL MEETING f' AUGUST 25, 1997 7:30 P.M. - NEW BRIGHTON COUNCIL CHAMBERS I CALL TO ORDERlROLL CALL I Pursuant to due call and notice thereof, Mayor Dennis Probst called to order the regular City Council meeting at 7:32 p.m. . Present: Mayor Delmis Probst, Councilmembers Beverly Aplikowski, Dale Hicks, Susan Keim, and Paul Malone. I Absent: None. Also present were: City Administrator, Brian Fritsinger; City Accountant, Terry Post; I Community Development Director, Kevin Ringwald; Public Works Superintendent, Dwayne Stafford; City Engineer, Greg Stonehouse; Administrative Secretary, Sheila I Stowell, and Recording Secretary, Cindy Schneider. After calling roll, it was decided unanimously that from this time forward, it would be Ie noted for the record who was present and absent at the meeting without calling roll. ADOPT AGENDA I MOTION: Aplikowski moved and Keirn seconded a motion to adopt the agenda for the August 25, 1997, Regular City Council meeting as presented. The motion carried I unanimously (5-0), APPROVAL OF MINUTES I A. August 18, 1997, Council Worksession ... . I B. August 25,1997, Regular Council Meeting I Councilmember Keim referred to Councilmember Aplikowski's questions raised regarding lake shore setbacks on Page 2 of the Regular City Council minutes. Councilmember Keirn stated that these questions appeared to remain open and unanswered, and inquired if the questions had, I in fact, been answered. Mr. Brian Fritsinger, City Administrator, stated they had not been answered, I MOTION: Malone moved and Keirn seconded a motion to approve the August 25, 1997, .. Regular Council Meeting minutes as presented. The motion carried unanimously (5-0), 'J I WOO~~Tr > 'I ARDEN HILLS CITY COUNCIL - AUGUST 25 1997 2 I CONSENT CALENDAR .. A. Claims and Payroll MOTION: Hicks moved and Aplikowski secondcd a motion to approve the Consent Calendar I as submitted and authorize execution of all necessary documents contained therein. The motion carried unanimously (5-0), I PUBLIC COMMENTS Therc were no public comments, I UNFINISHED AND NEW BUSINESS I A-I. Planning Case #97-15, Variances (Fence) - Michael Welsh, 1509 Colleen Avenue Mr. Ringwald stated the applicant is requesting approval of variances to allow for the continuing I existence of a fence. Specifically, these variances are for a fence that exceeds the height _. requirement inthe frontxard, is not 30% open for air flow and does not have its finished side I out. On August 6,1997, the Planning Commission recommended denial of the variances to allow for .. the continuing existence of a fence on height and direction of finished side, and recommended approval of a variance for 30% open for air flow, because this section of the Code is being proposed for elimination I Mike Welsh, 580 Cleveland Avenue SW, #12, New Brighton (Formerly of 1509 Colleen I Avenue), came forward to address Council. He urged Council to reconsider this matter, as the Mayor was not in attendance at the meeting where the administrative appeal was originally denied, He noted that the Planning Commission originally approved these variances, and was I surprised to have their decision reversed by the City Council. He stated he and his wife feel they are being harassed by the City. He stated a variance was applied for last Fall, which was not mentioned in Mr. Ringwald's background memo, and was awaiting a decision on the conflict of I code at that time. He inquired if the Code has now been changed. Mr, Ringwald stated a proposal is before Council for later in the meeting to eliminate the I requirement of30% open for air flow. Mayor Probst inquired why the applicant was before Council tonight if he is no longer the I property owner of record. Mr. Welsh explained he received the violation notice in May, and they closed on their house in June. Mr. Ringwald added the City assumes Mr. Welsh has told the present owner ofthe code enforcement action currently against this address, as they were I informed prior to the sale, Mr. Ringwald also noted that he had notified the real estate agent representing the Welsh's about the violation. .. / I I , ~~~ ~f ARDEN HILLS CITY COUNCIL - AUGUST 25. 1997 3 I it Mayor Probst inquired if the only section of Code that was unclear was the 30% open for air flow, Mr. Ringwald stated that was correct, and added the applicant was told last fall that all other sections of the code would be enforced except for possibly the 30% open air flow I requirement. When the fence was observed this spring, it was noted that the required repairs had not been made, and a notice was sent at that time. I Councilmember Hicks inquired regarding the height variance request. Mr. Ringwald stated the part of the fence that faces Colleen Court in front needs to be lowered to 36 inches. I Mr, Welsh stated Colleen Court did not exist when this fence was originally built. Councilmember Aplikowski inquired if the applicant was presently living at this address, Mr. I Welsh stated he was not. Councilmember Aplikowski inquired why the applicant was before Council and not the present I owner of the property. Mr. Welsh stated that based on Mr. Ringwald's statements, he held off on any rcpairs made to the fence until the code is changed. ... I Mrs. Francesca Welsh stated she has seen fences in the City with similar circumstances as theirs, and feels the City"is making these requirements more on principal than a desire for code enforcement. She stated she feels the fence should be "grandfathered" in, because it is nine years Ie old. Mayor Probst stated this process started with a complaint to the City, and further noted the fence was never granted a building permit. I Mrs. Welsh stated the adjacent neighbors have stated they don't mind the present appearance, and that it was neighbors further down the block that complained, Mr. Welsh stated he has seen I at least four other fences in the City with the same problem as his fence, Councilmember Aplikowski inquired if the part of the fence with the height problem was an I entrance fence. Mr. Ringwald stated this fence is technically on the front yard of the property, but appears as a side or rear property line due to how the house sits on the lot. I Mr. Welsh stated that Colleen Court did not exist when the fence was built, and he did not find it logical to put the finished side out on an undeveloped acre of land, I Councilmember Hicks stated the Welsh's shouldn't feel as ifthe City is harassing them; even if there are other fences in the City with the same problem, theirs has received a complaint and needs to be dealt with. He stated if the neighbors to the east had no problem, he could support a I variance for the unfinished side and 30% open air flow, but would still support reducing the height. I Councilmember Aplikowski stated it would be just as much work to repair one problem as it would be to repair both, and stated she is considering granting a variance for everything. .. , I . I ~~ ~ ARDEN HILLS CITY C CIL - AUGUST 25 1997 4 I Mayor Probst inquired where the front yard is on this property, Mr. Ringwald showed an .. overhead of the property. Mayor Probst stated the ordinance was in place when this fence was built, and to grant these variances would set a bad precedent, as the City can't arbitrarily approve one and not another. I He stated it would be possible to approve a variance for height but not for the finished side out. Councilmember Malone statcd the fence was also built without a permit, and a building I contractor would have known the finished side belongs facing out. He stated others in the area have complied with the ordinance, and to grant a variance would send the wrong message to I others in the area who have obtained permits and are in compliance with Code. Mr. Welsh stated he knows of a fence built just last summer that does not comply with the 30% I open for air flow ordinance. Mrs, Welsh stated the repairs would necessitate destroying the new owner's and adjacent neighbor's landscaping. Mr. Ringwald noted that neighbors directly adjacent to this property have talked to staff, as of I .-. last summer. MOTION: Malone moved and Hicks seconded a motion to deny the variance for height in I front yard and finished side out, but approve the 30 percent open for air flow vanance. .- Councilmember Keirn noted an item can only be "grandfathered" in if no ordinance existed at the time of construction, and this was not the case with this fence, I Councilmember Hicks inquired if the new owners had been informed of this issue, as it would be the new owner's responsibility to correct the problem. He stated he hopes they were told, as I doing so would have been the responsibility of the Welsh's. Councilmember Aplikowski stated she knew of another similar problem in the area, and that I fence was able to be brought up to Code without any major destruction of landscaping. She further stated this problem was no longer the applicant's responsibility. Mrs, Welsh stated they I are still the ones receiving notices from the City regarding this matter, Mayor Probst asked for a vote on the motion, I The motion carried unanimously (5-0). A-2. Planning Case #97-]6, Site Plan ReviewNarianee (Height of Structure) - Friskies I Pet Care, 4251 Fernwood Avenue Mr. Ringwald stated the petitioner is requesting approval of site plan review for a 672 square I foot addition which is to accommodate an enclosed silo onto their existing facility, including a .. I I I W~~ ~V ARDEN HILLS CITY COUNCIL - AUGUST 25 1997 5 I f' height variance (42 feet proposed, when 35 feet is allowed). This silo will make the operation of the plant more efficient, but is not expected to increase production. I Mr. Ringwald showed overheads of the existing and proposed silos, and the screening to be provided. The Planning Commission at their August 6, 1997 meeting, required that additional screening in the form of evergreen trees be provided, The Planning Commission also I recommend approval of the height variance and the site plan review at this meeting. Mayor Probst requested clarification that the proposed silo will look identical to the existing one, I Mr. Ringwald stated that was correct. MOTION: Malone moved and Hicks seconded a motion to approve the height variance and I site plan review in Planning Case #97-16, contingent upon the applicant complying with the Planning Commission recommendations for screening. The motion carried unanimously (5-0). I A-3. Planning Case #97-18, Zoning Ordinance Modification - City of Arden Hills I Mr. Ringwald statcd the Planning Commission recommended approval of the amendments to the following ordinances: VI, C, I, a; VI, C, I, d; VI, C, 2, a; VI, E, 4, c; VI, G, 3, a(2); VI, G, 6, a; and IX, A, 2; and to dcfer action on recommendations for the following ordinances: VI, E, 4, d Ie and VI, F, I, e. If the City Council is supportive of the proposed modifications to the Zoning Ordinance, then the City Attorney should be directed to prepare the ordinance for Council's I approval, which would incorporate these changes into the Zoning Ordinance. The Staff anticipates bringing sections VI,E,4,d and VI,F, l,c to the Planning Commission in October rather than September, due to the changes suggested requiring a republication of the Public Hearing I noticc. Councilmembcr Malone stated he was under the impression that VI, F, I, c (Building Standards) I requires that all driveways be pavcd, Mr. Ringwald stated it does rcquire that drivcways be paved, except for single and two-family homes. I Councilmember Malone inquired regarding the 30% open for air flow rcquirement, stating the original intent was to not have solid fences. He stated varianccs have been denied for solid walls, but other sections in the Code permit walls. I Councilmember Malone stated he is hesitant to approvc dcletion of the 30% open for air flow requirement. Mr. Ringwald stated this ordinancc could be pulled and brought back for further I discussion. I Mayor Probst inquired if the recodification would be a separate action by Council. Mr. Fritsinger replied it would be separate. .. Mr. Ringwald stated his preference to discuss the Code regarding walls at a later date. ~ I --------- ------------------ ~~~~v I ARDEN HILLS CITY COUNCIL - AUGUST 25 1997 6 I Council member Malone sought clarification on the interpretation of Section VI, C, 1, and that it .. was the intent that if houses on the same block were closer to the street or on a mean setback line, that became the setback line, not necessarily further back. The current code states that, where the principle buildings have a different setback from the minimum, the setback of the new structure is not less than the prevailing setback; allowing recognition of houses closer to the I street than the prescribed 40 feet in certain neighborhoods. In situations where the principle buildings have a greater setback, COLmcilmember Malone suggested his interpretation of the I intent was not to push other buildings back. Councilmember Malone inquired ifthere had been cases come before the City where prevailing setbacks were an issue. Mr. Ringwald replied affirmatively, and that variances for setbacks had been granted based on I other houses in the area having corresponding setbacks, Mr. Ringwald cited several examples, and stated it was current City practice to require a variance for less than minimum setback, or I lines were drawn and a median number used. A discussion ensued regarding related setback Issues. Mayor Probst stated he does not fully understand the 30% open for air flow requirement, stating I there are many fences in the City that do not meet this requirement, but are still attractive to look at. Mr. Ringwald stated this issue could be set aside and discussed further in the future. I Council member Aplikowski noted businesses have high fences and do not have open for air flow requirements, Mr. Ringwald stated this is for screening. ~ Councilmember Aplikowski noted this could be taken as a double standard, as the ordinance reads "except for screening". I MOTION: Hicks moved and Malone seconded a motion to authorize the City Attorney to make the changes to the Zoning Ordinance as recommended by the Planning I Commission, excepting the sections outlined in the attached memo and section VI, E, 4, c for fulther clarification. I Councilmember Malone requested an amendment to approve section VI, E, 4, c since the majority of the Council approvc of this change. Councilmember Hicks accepted the amendment. I Councilmember Aplikowski suggested this section should not be approved until the solid wall issue is completely clarified. I Councilmember Malone withdrew the amendment. Councilmember Aplikowski inquired why Round Lake is classified as Recreational I Development. Mr. Ringwald stated this c1assilication is assigned by the Department of Natural Resources (DNR), not by the City. He suggested this classification may have been applied due I to the normal recreational character oflakes, even though not applicable to Round Lake, \ -- I I lID ~~~ ~ ARDEN HILLS CITY COUNCIL - AUGUST 25. 1997 7 I fI The motion carried unanimously (5-0). B. Comprehensive Plan, Request for Proposals (RFP's) I Mr. Ringwald stated Staff is requesting City Council authorization for a Request for Proposals for updating the City's Comprehensive Plan to a short list of planning firms in the Twin Cities I (approximately 9), Mr. Ringwald advised the Council that Staff had received notification earlier that day that the City of Arden Hills has been awarded a grant of approximately $8,300 from the Metropolitan Council to aid in updating the City's Comprehensive Plan, I Mr. Ringwald requested that Council review the dateline in the attached memo to see if these dates would work with their schedules. I Mayor Probst inquired ifMr. Ringwald needed a commitment to these dates at tonight's meeting. Mr. Ringwald stated he would, if the Request for Proposals is approved. I Councilmember Malone inquired if a large response is expected, Mr. Ringwald replied he -- expects replies from most of the firms sent a Request for Proposals. I , (- MOTION: Malone moved and Aplikowski seconded a motion to authorize Staff to prepare ( the Request for Proposals and that the RFP's be distributed to the planning firms Ie identified, The motion carried unanimously (5-0). C. Award Contract for South Water Tower Maintenance and Repairs I Dwayne Stafford, Public Works Superintendent, stated engineers reviewed the South Water I Tower and estimated the necessary repairs at approximately $25,000. Proposals for this work have now been received, and Staff wishes to award the bid to Odlund Protective Coatings for $20,450, This company also did repairs for the North Water Tower, and they are able to begin I work this fall. MOTION: Malone moved and Keim seconded a motion to award the bid for repairs to the I South Water Tower to Odlund Protective Coatings in the amount of $20,450, with the work to be completed by October I, 1997. The motion carried unanimously (5-0). I ADMINISTRATOR COMMENTS I Mr. Fritsinger stated he wished to comment on the absence of Gateway Business District items on the agenda, as these items were expected to consume a large portion of tonight's meeting. I Mr. Fritsinger stated bids for the work on 14th Street have been received, and the City can move forward once the final purchase agreements from Welsh are signed. However, this has not ~ " I ------------------- ---- ~~~~F I ARDEN HILLS CITY COUNCIL - AUGUST 25 1997 8 I happened yet. He stated the City has 90 days to act on these bids, and could either return them to .. the bidders, or hold them for a short period of time while the Welsh issues are being resolved. Mayor Probst suggested holding onto the bids for the moment, as the City has only just received them. He inquired what issues are holding up the Welsh agreements. Mr. Fritsinger stated the I main issues are property acquisition dates. Mayor Probst inquired what the issue was with the property acquisitions, Mr. Fritsinger stated I Welsh is mainly concerned with the high cost of soil correction on some of the parcels, Welsh is reluctant to close on these parcels until the exact soil correction figures are known, There are various soil experts working on proposals at the moment. I Mayor Probst agreed that work should not continue in this area until those issues are resolved. I Mr. Ringwald stated that work camlot continue until these issues are resolved, as the property would not be Welsh property until the purchase agreements are finalized, Mr. Stonehouse stated the figures for the 14'h Street work came in slightly lower than originally I estimated, Councilmember Malone'stated the low bidder should be contacted and told of this situation, and I that their bid may not be acted on in the near future, Mr. Fritsinger stated the City's concern with these delays, stating the bid probably could not be .- awarded until mid- to late September, and the actual work would not be started until 2-3 weeks after that point. He stated Welsh is also aware of these construction delay issues, and stated the I City will be meeting with Welsh on August 26, 1997, to discuss this project in more detail. COUNCIL COMMENTS I Councilmember Keim referred to a recent article in the Bulletin, stating the article may have I misled citizens, as it is not clear whether a pedestrian trail will be constructed over I-35W or over Highway 10, She stated it may be helpful to try and let citizens know of the City's position, and ofthe errors that were in this article. I Mr, Fritsinger stated this issue was discussed with staff of the Bulletin, and they reported on the conversations that went on at the meeting. I Mayor Probst stated the article may lead people to believe that a safe pedestrian trail with no vehicle conflicts will be built over I-35W, and this is not the case. I Councilmember Keim agreed, stating the article makes the trail sound much safer than the City believes it will be. I .. I ------------ I' W~~~~ ARDEN HILLS CITY COUNCIL - AUGUST 25.1997 9 I Mayor Probst wished to publicly thank resigning receptionist Carolyne Kapitan, and thanked her ~ for ajob well done. Mayor Probst complimented Mr. Fritsinger's recent article in the Bulletin regarding bonding I issues associated with this project. Mayor Probst requested clarification that the proposed agenda for the September 15th Council I Worksession will be the agenda used. Mr. Fritsinger stated he wishes to discuss the topics as noted, as they are an extension of what was discussed at the recent Staffretreat. I ADJOURN MOTION: Malone moved and Hicks seconded a motion to adjourn the meeting at 8:45 p,m. I The motion carried unanimously (5-0). I _. I - Dennis Probst Brian Fritsinger Mayor City Administrator Ie NOTICE OF MEETINGS I The next regular City Council meeting will be held September 8, 1997, at 7:30 p,m, at the New Brighton Council Chambers, I I I I I I ,. I I ~ CITY OF ARDEN HILLS PAGEIOF3 I . ACCOUNTS PAYABLE CLAIMS REPORT TO BE APPROVED AT THE 09108/97 COUNCIL MEETING I- I CLAIMS PAID SINCE LAST COUNCIL MEETING (08/25/97) I IlX.# ICIt.DAllllVJl.NJ:l()R I AMOONT 1 COMMENTs .::1 1 I 12646 08/27/97 DCA, Inc, - FSA Deoartment 118.71 Medical Reimbursement T osteoson, P IR # 17 I 12647 08/27/97 E - Z Recycling, Inc. 4,714.00 Au rust Service 12648 08/27/97 Terrance Post 60.05 Reimbursement Mileage and Meetino 12649 08/27/97 AT&T Wireless Services Phoenix 64,40 Current Invoices 12650 08/27/97 Midwest Asphalt Corporation 160.16 Road Materials - WjDiscount I 12651 08/27/97 Timesaver Ofr Site Secretarial 163.50 Planning Commission - 08/16 I 124.00 Council Meetin. - 08/13 12652 09/03/97 Postmastert St. Paul 400.00 Posta.e for Permit #1962 12653 Check Voided -- I 12654 09/03/97 Met Council Environmental Services 48,322.00 Sewer Char.e - Seotember , 12655 09/05197 Public Emplovees Retirement Association 2,561.55 First Seotember Payroll , 12656 09105/97 ICMA Retirement Trust - 457 1,401.92 First Seotember Payroll I 12657 09/05/97 State Capitol Credit Union 3,216.69 First Seotember Payroll 12658 09/03/97 United States Postal Service 400,00 Office Posta.e Pitney Bowes 12659 09/03/97 Tracv Petersen 298.70 Reimb. - Mile..e and Snorts Eouinment 1 I .. 1 Subtotal - Paid Claims 62,005.6811 I I Paid Claims From Above - 62,005.68 I Add Unpaid Claims, Page 3 of3 - 130,640.59 Total Accounts Payable Claims for Council Approval, 09/08/97- 192646.27 I 1 I I I c"""~ .. I I CITY OF ARDEN HILLS PAGE20F3 I . ACCOUNTS PAYABLE CLAIMS REPORT TO BE APPROVED AT 09{O8/97 COUNCIL MEET~NG I- UNPAID CLAIMS REGISTER: I 1 'lEMP 1/.1 OC.DATEl...VENDOll. . ..AMOUN'tlCOMMEI\l'IS ..J 1 1 TOOl 09/09/97 Accurate Press, Inc. 7.69 Tax Due Previous Invoices I 550.61 August Newsletter T002 09/09/97 American Engineering Testing, Inc. 1,029.30 Consultation Cummings Park T003 09/09/97 Anderberg- Lund Printing Companv 2,448.44 Fall Recreation Guide I T004 09/09/97 Animal Control Services, Inc. 305.30 Do. / Cat Enforcemen t. 08t08 08/25 I I 1 T005 09/09/97 Arden I-Iills Tire & Service Center 416,68 Vehicle #17 Four Tires T006 09/09/97 AT&T (Kansas Citv) 29,28 Current Invoices - Lon2 Distance T007 09/09/97 Bover Ford Trucks, Inc. 1.19 Vehicle #107 Hvdraulic Oil Seals T008 09/09/97 Bradlev & Deike. P.A. 25,00 Legal Services - Julv. Gateway Dist. #2 I T009 09/09/97 Carlson Equipment Company 74,50 Paint SDraver for Curbs T010 09/09/97 Certified Laboratories 123.59 Hvdrant Lubricant TOll 09/09/97 Corporate Express 62,15 Various Office Supplies T012 09/09/97 I Davies Water Eauioment Company 669,97 Lift #14 Reoair Parts I T013 09/09/97 I Earl F, Andersen. Inc. 77.41 Sigo for Ridgewood Court I 120.00 Desigo Charges - Hazclnut Park I 5.175,00 Surface Materials - Hazelnut Park I T014 09/09/97 Electro Watchman. Inc. 233.24 Booster. Red Fox Tower & Fcmwood Tower 383.40 Lift Stations Quarterlv Charge. 09/01-11/30 T015 09/09/97 Fall Maintenance Expo 70,00 Cl asses - Seven Public Warks Emo] ovees .. T016 09/09/97 FlagllOUSe, Inc, 65.00 Elementary Soccer Net T017 09/09/97 Gopher Sport I 443.44 Sports Equipment Playground & Recreation T018 09/09/97 Government Training: Service I 30.00 Building Codc Seminar Scherbel, 12/03 T019 09/09/97 W. W, Grainger, Inc. 73.14 Roll Towel Dispensers Parks I T020 09/09/97 Kathv Henquinet 30.00 Refund - Fall Soccer _~ T021 09/09/97 Hokanson Plumbing & Heating 132.00 Refund Water Permit #2660 (Dup, pymtT T022 09/09/97 International Conference of Building Officials 19.10 Publication- "Abatement of Damzeraus BldlZS." I T023 09/09/97 Kath Auto Suoolies 90.71 AU2Ust Purchases Public Works T024 09/09/97 Kath Companies 9.85 Parts for Pressure Washer T025 09/09/97 Lake County Chapter - r.c.B.O. 135.00 Seminar-"1997 Fire Code UP" Date", Scherbel T026 09/09/97 Lillie Suburban Newspapers, Inc. 66.80 Ads for Bids Cummings Park and Gatewav I T027 09/09/97 MIM - Mutual Service Insurance 270,00 Refund - Adult Fall Softball T028 09/09/97 Citv of Maolewood 40.00 Vacation Dav Trio 10/16 T029 i 09/09/97 Carrie McCollar 180,00 Editor September Newsletter T030 09/09/97 McDonald Battery Company 106.50 Vehicle #106 - Two Batteries I T031 09/09/97 Medica Health Plans 3.152.53 Seotember Insurance T032 09/09/97 Met Council Environmental Services 40,441.50 Sac Rcmittance - July T033 09/09/97 Metropolitan Inspection Service, Inc. 1,608.80 Electrical Insoections - AU2Ust I T034 09/09/97 Midwest Asohalt Corooration 61.83 Road Materials W/Discount I T035 09/09/97 Mike's Pro Shop 299,60 Softball Trophies - Fourteen T036 09/09/97 Minnesota Mutual 505,40 SeotemherInsurance T037 09/09/97 MN Deoartment of Natural Resources 165,00 Bow Hunter Education Class. (33) I T038 09/09/97 Angie Morrissev 30,00 Refund - Fall Soccer T039 09/09/97 Northern States Power Comoanv 4,417.73 Current Invoices T040 09/09/97 Janet Palermo 60.00 Refund - Soccer (2) T041 09/09/97 Peterson, Fram & Bergman, P.A. 1,324.45 Legal Services July I 6 921.70 Prosecution Fees 1 Total. Page 2 of3 Carrl~d Forward 72,482,831 c'-"""' .. I I CITY OF ARDEN HILLS PAGE 3 OF3 I ACCOUNTS PAYABLE CLAIMS REPORT TO BE APPROVED AT 09/08/97 COUNCIL MEETING I- UNPAID CLAIMS REGISTER (CONT.): I I!mMp/#..ICiC.nA1'BI....\lE.NDOIl. 1..AMoI.lNTICmdMllNlS I I I T042 09/09/97 Pitney Bowes~ Inc. 226,10 Meter Rental, 10/16/97 - 01115/98 I T043 09/09/97 Ramsey County 49,309.00 Law Enforcement Septcm ber 1,378.06 Diesel Fuel and Unleaded Gas - July 4,43534 Partial Pymt. #2 - AH Share (Hwv. 96 - SV) T044 09/09/97 Kevin Ringwald 11.97 Reimb. Economic Development MectinR$ I T045 09/09/97 Robinson Landscaping, Inc. 26838 Sod - Hazelnut Park and Briarknoll Trail T046 09/09/97 Rosedale Chevrolet GEO 75.90 Vehicle #104 - Reoairs T047 09/09/97 Rotarv Club of Arden Hills / Shoreview 139.50 Dues and MeetinllS - 2Q97 I T048 , 09(09/97 Ryder Student Transportation 162.00 Summer Playground Trio- 08/05 IMetrodome) I T049 09/09/97 Sail v's Caterin. 53,00 Worksession 08/18 i T050 09/09(97 David Scherbel 50,92 Reimbursement Mileage and Meetin. T051 09/09/97 T. A. Schifskv & Sons, Inc. 104.70 Road Materials 'I T052 09/09/97 Schulze Excavating 332.50 Grading Path on County Road E I T053 09/09/97 Sereo Laboratories 339.00 Water Tests - AU2Ust T054 09/09/97 The Sherwin - Williams 3438 Vehicle TL12 Matching Paint T055 09/09/97 Timesaver Off Site Secretarial 153.00 Council Meeting 08/25 I T056 09/09/97 Triarco Arts & Crafts, Inc. 35,85 Summer PlavlZTound Supplies T057 09(09/97 US West Communications 822.65 Current Invoices T058 09/09(97 Cynthia Walsh i 68,64 Reimbursement - MilealZc T059 09(09(97 Wear Guard ! 31.49 Uniform Purchase Koesling lei T060 09/09(97 Gregory and Lona Williams 11538 Refund - Utility Acct. #2472, Duolicate Pvmt. T061 09/09/97 Gretchen Miller Wrobel I 10.00 Refund - Overoavment Dance Class I I II Subtotal, Page 3 of 3 58,157.7611 II Page 2 of 3 Brought Forward - -- 72,482.8311 I Total Unpaid Claims --- 130.640.591 I I I I I I .. I I I _ 188~ 888~. ~8~. 88 . CD "'...' 0 0 Irl 0 0 0 c ~ ",;0 0 0 Il;l,I q ~ It"l Pi ~ ~ N ~ pf I ~ : a I s c.. .... .~~ - .... ~ ~ ~ I " ~~'" )3;~~ ::8 !:O 8,01 8~.,~ $~:?':17i8 :B~r:::~$ ::::~~!;;~ "g'f:l3.. .~'~ ~ ~ ~ g ~ ~:~ ~ ~ :.1" ~ ~ ~ ~ ~ ~ ~ ~ ~'.~I.... ~ ~ ~ ~ ~ ~j~ ~ J ,;\Q.VJ..Cl. c<l.....t\ ~<1.." N. f'!f'1.\O~Oi!l".. \O"V)o"qv .'\:l" <<"l ..... N ..... ..... ".. ('t1 ..... 0. ..., 00 ,--. c<l 0:1'1 N ill <I> f'. 4( "',, I..... ..... c<l .',: <<"l I c<l ~ ~ 1ii IS!!. I ", . ~ ~ :g Vl i I SU~ _ :tl ",,-B 01 0 ' .. ,,'li ~ '~ o ""' 11 Q ~" ~ II .0 I Cl S 6 .0" ifi 6 0 < e .... iil ~ LU P. "Ul s r::.::: , t: - 9 u lr, =a;;...;9 , , .. ._ \l _. I\J ,", = = ,j,J _ ~ oo:t ~ G) III I- Q. ~ " " ~.. I. o.~ '0 0 - ...... "' g,..; 0;" 1l ..-f" ~ 1:: 0:: ro ~ ' 1ii j:ill \l I 00 0 N ~ I:: ;:;: ~.. 0 0 U b::l _ I-< :...i< Cl I\J ~ ~-. -' \Ci @) ~ - ,.., 1....1 t.a ::: u ~ -= ~ ' ~ .~ 8 r:: ~ " ij ~ ~ i.l ~ e U I\J , - , t:::" >. "C :,.- I\J @) '"0 t:l . 00 ~ .-.~ = "C,. . -, 0 ~.a< F.-,g ~ ~ >: "0 "C .- ..c c , . 11) <'II ..... -- ="'0' I ~ 0.. ~ " e '.; ~ .1. ... a ;:J ~ ~ fa i', ~ : '" ]" 1'!! ~ v ~ 0 ::E ~ 01) \:I" _ ro ~ _' ~ ~ &: .'::: _..0 ~ o::E -8 ~ '" LU . << ~~Qt <<I ~ e<11 _~~UI ~<< Iwl I J: ....................:&... f-< f-< U U < < < g ,,;:;: g . - "". ,;; ~ ~ - 0 ~O... ~ - U U ;; r..-.= - _ _ _ CIl V) Vl, ~ U ,', III '" ~ ....' 0 <I) .t! ..... - ~n otjI IJ _ _ ... o -~CIl~~ {..l..~~: ~_:, v.i ,.5g,.::J. E-oZoi5:~d ,..JZ~~ Z I 1I11W [In!! iiITJ i I ...J ! ~!'!!I ~ _ I I ...J I <:! 8 " " , o !:; . 8 8 .l.l A ~ ~ -g i . a: Ir'!ll ~ I ~ ~ ~ ~ ~ J: J: J: &l ~ I > 1:l ~.~ 1 I I I I I I I ....:..Iol :=I:;i ~ J '1 ~ I"'~ .~ ~ 1 111 I J:dl] . ... 't: 'r! "d c .. ~ l:j '" '" I a: al ~ 0 -> ' ;; ~ ~ ~ ~ ~ ~ ~ ~ ~i ~ ~ I 8 8 I IN 0 ~ - I LUI- i d d d d d $1$ 8 $ 8 $ $ $ ~ 8 $ $ $ 8 $ 8 8 8 8 8 8 8 ~ 8 8 ~ 8 8 ~ 8 c.. 1\,;11 ~ ~ ~ ~ ~ "!" " " " " " " :; " " " " " " " I;; " " " " " ~ " " ~ :i ~ ~ N LU ,n ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ N ~ ~I~ ~ ~ ~ ~ ~ ~ N ~ 0 ~ ~ ~ ~ ~ v ~ N ~ ~ N N I liU t-;t;C"!qt;"iq~t;q~~t;C"!Oi"iqt;t;"1aC!Vj"":'Ci--!q"'t~C"!C"!a;"":~"":~l""' l- ::j: :! ~ J::: ::j: 1;' 0 lii5 ~ or. 1il ~ or. ~ I;; ~ ~ ..0 0:: ~ ;i V1 .... ~ 8 :G rJ b1 ~ \0 .:;:; ~ ~ 1il ::s ,,'~ ,^ NN....NNN. \OO'\~o"....~f"l\Qlt')V~~a:sl'!.~~....t--c:l.v..,...,.Sl...... : U,I .................... I:'t'i ~ I ~ I 88888I"giO~:lI&l88::l8888:;8~8.,.,"8888:l1l<l88:::8p;; ~!~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 00 g ~ ~ ~ ~ ~ ~ N ~ ~ N ~ ~ g ~ ~ ~ ~ N g ~ ~ ~ NNN~N"::t.b;.q~~t1c:sH..,.(q~~~~l-.N";z,"<t,..tf'!..qr-;.......$i!i..,."~...... ~ N' ...... ............ ...... N...... .............................. .................... 'Ii:I: I ~ Il;l, rn ::I! I T I ' "," - E " ..... ....I .""1 "i: ~ ~ ~ ~ I .I.. ...J :z;'0\ ~ ;::: 0 I::: .d (j ~ I >-:..::l Q.. -= I ~~ 1,)", ..,.E..... >."'C u c'3~ ;>.. CUc'3:-;::",O>";>.. ro J: ~~ '5='=~JS;'j~~8.~g IJ~ ~~~~roi1~~~:s~-E.E~.~~~ro:~ Z """ 00 ~ ro .:-:: 5 tll ::.:: ~ -= ulll Cl ro 01) .$ -.:- "'0 ~ 0 S ~!J; E IJ <';S -, -= ~..= .c Eo- 0 ~ OJ,) : e "" l""'f"'I~~_ "'~~~ !.~-:;:;'!lJ~""'~ Clro"'OCl >. Ou .....l"'..=..... I LU O. ~.. CI . ~ Cl :s ~ :E 0 C/.l ~ '":';' ~ IU uOJ,) ~ ,!;" -~ -~..... OJ,) _~..... OJ,) eO U ~ 'z- c ~..... 0 :;: ';!!:.C::;;5" ~ 0lJ... cnOll<d'" =OU_..... ...._Qq) ~-~ ~l-o_~~...-< ~0lJ--;,;;.....::::::~ '"' " "'d '" = 0 '" ~ Q ~ ~ 'i) ro .0 E-< ~ ~.5 ~ '" Q = C/.l tl ~ ~ OJ,) :.: ..c: ~ .5 '" "i) OJ,) ~ ~.- :;.J. L...I . ~ 0 ~ .0 e .;;;: 00 ~ .':: ~ "'0 0 .... 8 ~ "'" - ~ '" '" :E Q ~ "'0.0 ~ .. ~ ~~~~~~~~~~a~~~j~~J~~~a~8~~~~~~8~~~~~~~ Ie ~ ~YO.'. ~ ~ ~ ~ ~ 00 ~ ~ ::J :l ~. ~ ~ ~ <l ~ 1!i 01 is !;; 00 ~ <l ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ .~ Il;l,-:t - - - - - ~ ~ ~ ~ ~ ~ N N N ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ .. . .. . .. .. . .. . . i 3 >- II>'" .8. " ~ ':' ~ N f"'I ~ ~ ~ ~ ~ ~ N f"'I ~ ~ ~ ~ ~ ~ N f"'I ~ ~ ~ ~ N f"'I ~ _- 0 __'.~..'........~.o.... ~ 11; 11; 11; ~ 11; ~i~ 11; 11; ~ :!< :!< :!< ~ :!< :!< :!< :!< ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~6...... ~ I ()"..... . .. . . .. "I:' . .. .. . . .. .. . .. .. .. .. . . .. .. . .. .. .. . .. . .. .. ".", ~ ----- .. r -. CITY OF ARDEN HILLS MEMORANDUM DATE: September 5, 1997 TO: Mayor and City Council FROM: Brian Fritsinger, City Administrat@ - SUBJECT: Newsletter Committee Appointment Background Attached is an application of interest and a resume from Sharon Hanzalik, 1768 Venus Avenue, to serve on the Newsletter Committee. Ms. Hanzalik would like to begin her service with the - City beginning with the November newsletter. - Recommendation - The City Council is asked to consider the appoininient of Ms. Hanzalik to the Newsletter Committee. - --e BF/sls I I I I I I I t' I " .. cp/1":'m ~ ~"2 <~~ CITY OF ARDEN HILLS ~...a....,;d.. 1450 WEST HIGHWAY 96 ARDEN HILLS, MN 55112-5794 - ADVISORY COMMITTEE, COMMISSION, TASK FORCE APPLICA nON FORM DATE: NAME: .....j h tL n'vl HtL'v1 Zit (;J:: - ADDRESS: I iLo"l V e/~LlU Ih'f' TELEPHONE: {; ;, :; (.c(c; 1 (H) (W) (FAX) ADVISORY COMMITTEES: - (If you wish to be considered for more than one committee, please order in number of - preference.) - - Business Relations Committee Finance Committee - - -L Newsletter Committee Parks and Recreation Commission - - e- _ Planning Commission Public Safety Commission - Youth Commission I SPECIFIC INTERESTS: I (As the Council prioritizes its goals, it may create additional/new committees or task forces from time to time. If you are interested in any of the following or if you share any other specific areas or topics of interest, we will retain your application for future openings in those areas as new I committees are created.) _ City Facilities Task Force _ Lake Quality and Environmental I Task Force _ Highway 96 Task Force ~ City Communications Task Force I _ Emergency Preparedness Task Force _ Community Diversity Task Force I Other Interests: (continued) I -. PHONE: 16121 633-5676 . FAX 16121 633-7839 I - . WORK EXPERIENCE: ", .n// n./ :f-.1'7 i dd/rfi _'./LltJ.-!'1.t~ f)1L-KLC ;"it'fiC7 / ~/ ..-, .;1/? 1:.:} / CIVIC, PROFESSIONAL & COMMUNITY ACTIVITIES: ',pv(~ ( l1..t! ti F JU ~ /uJ./dCtt-l," 'J{'lV--t, 5I,/tt>I<t" {)P-ih"sJ (/{, ( I WHY DO YOU WANT TO BE ON AN ADVISORY COMMITTEE: .-:- ('ffnfni)~dG fr( 5Kti/5 10 "-flu.. C;-kl ne(A)s/elh I /) / - WHAT SKILLS, STRENGTHS OR ABILITIES DO YOU BELIEVE YOU WILL ADD - TO THE COMMITTEE: ... (~ dld--/YlI/;. (les~1cr F,;};I/:?1<4~j : -tJrJt:f../;1iUtI?'r.~.J G'hl4_ -. ?e!P-S~, re5c!W1of~. pAdfrgfn;fJ7 ADDITIONAL COMMENTS: - I - I REFERENCES (Optional) ~ Address Phone .. I .._-~ I I Please return this form to: City Hall Atten: City Administrator City of Arden Hills I 1450 West Highway 96 Arden Hills, MN 55112 f' Telephone: (612) 633-5676 Fax: (612) 633-7839 I " >. -------- -----~ . . - March 19, 1997 Brian Fritsinger, City Administrator Arden Hills City Hall 1450 W. Highway 96 Arden Hills, MN 55112 Dear Mr. Fritsinger, I spoke with you early last week on the phone regarding the Arden Hills city newsletter. I had heard [rom Lois Rem that you might be looking for someone else to do the newsletter. I am interested in taking this project on as a side job. - - I have over 10 years expericnce as an in-house publications editor and desktop publisher as you can, see by my enclosed resume. I am willing to meet with you to discuss the changes you would "like to see in the newsletter, offer my'ideas, and provide a rough draft of the revised newsletter. - Please keep me in mind of you decide to change the current source you use for the .- newsletter. - Thank you. Sincerely, #ulA-1ht./ >f:,k--t1Zd-i'<)C I Sharon Hanzalik I 1768 Vcnus Avenue Arden Hills, MN 55112 633-6187 I enc. I I I .. ~ I ~ Sharon Hanzalik 1768 Venus Avenue, Arden Hills, MN 55112 (612) 633-6187 . OBJECTIVE To design and prepare the Arden Hills city newsletter for public distribution, EXPERIENCE On-Call Proofreader, Merrill Corporation (September 1995 to January 1996) Senior Publications Editor, State Farm Insurance Companies (1986 to October 1996) Editor, State Farm Insurance Companies (1984 to 1986) Compensation Bookkeeper, State Farm Insurance Companies (1982 to 1984) Accounts Payable/Receivable Clerk, Slate Farm Insurance Companies (1977 to 1982) JOB RElATED SKILLS Communication . Write articles for in-house publications (audiencc----l,500 people) . Evaluate, edit and proofread all publications, flyers and programs . Investigate and verity information in articles written by others for publication . Proofread news releases generated from Public Affairs . Develop and maintain professional relationships with vendors, Printing Department, agents and all levels of staff - . -Perform secretarial duties as backup for Public Affairs secretary . Serve on United Way. Adopt-a-Family and Special Olympics Committees - Leadership . As regional electronic pnblishing liaison, train colleagues on new and revised Corporate programs -e . As team leader, assign projects as needed . Work with Publications Advisory Board to increase readership and maintain tight production schedules I . Charter member and vice president of the Nonh Suburban Optimist Club Design . Design logos, letterheads and covers for special agency publications I . Produce special employee and agency publications using desktop publishing skills . Act as regional photographer . Designed and typeset the Minnesota Councilfor Learning Disabilities Newsletter I SPECIAL ABILITIES . Strong organizational skills I . Detail oriented . Resourceful . Proficient on Macintosh computer using Quark Xpress, Microsoft Word, and Adobe Photo Shop I EDUCATION Lakewood Community College, White Bear Lake, MN . Liberal Arts Core Courses . Continuing Education Courses I University of Minnesota, St. Paul, MN . Continuing Education Courses I PERSONAL INTERESTS ~ Antiques. softball, volleyball, photography, crafts REFERENCES Available upon request I " . CITY OF ARDEN HILLS . MEMORANDUM DATE: September 3, 1997 TO: Mayor and City Council - Brian Fritsinger, City Administrat@ FROM: SUBJECT: Preliminarv Pavable 1998 Levv Background Staff has been developing, reviewing and summarizing the proposed 1998 budget throughout the summer. At the outset of this process, Council gave general direction to staff with regards to pay plan assumptions, capital plan items and net levy percentage increase expectations. , - . At this stage in the budget process, a levy after HACA and LP A payable in 1998 of $ I ,864,320 is being proposed. This preliminary levy represents a 1.91 % or $35,000 increase over the comparable payable 1997 adopted levy. The following table analyzes the need for this level of increase by summarizing changes in other revenue categories as well as related expenditures by function. . 1997 Proposed Change - General Fund Revenue Budl:et 1998 Amount Percent - * General property taxes $1,776,250 $1,825,710 $49,460 2.8% - * Intergovernmental 321,842 321,311 (531) (-.16%) * Licenses & Permits 186,250 196,850 10,600 5.7% - * All other 169.670 181 570 11. 900 7.0% I Total Revenue $2.454.012 $ 2.525.441 $ 71.429 2.9% I General Fund Expenditures I * General Governm:ent $554,490 $529,270 $(25,220) (-4.5%) * Public Safety 946,167 965,245 19,078 2.0% * Public Works 487,035 526,905 39,870 8.2% I * Parks & Recreation 273,645 312,275 38,630 14.1% * Other Financing Uses 192.550 182.550 (10.000) (-5.19%) I Total Expenditures & Other Uses $2.453.887 $2.516.245 $ 62.358 2.5% ,. I -- ---.--- . Preliminary Payable 1998 Levy September 3,1997 Memorandum Page Two . Historical Levv The City has historically maintained a fairly low net levy percentage increase each year. Since 1993, the percentage increase experienced by the City is as follows: Year Increase 1993 .62% 1994 9.94% 1995 4.94% 1996 2,94% 1997 1.95% 1998 1.91% Capital Expenditures ~ The net levy proposed does not reflect all of the revenue and expenditures involved as part of municipal operations_ As a result of the 1998 Capital Improvement Plan, actual expenditures are planned to increase $4,358,316 (60.2%) over the 1997 adopted budget level. Most of this extraordinary increase is related to three spending items: a, Increased D/TED Economic Development Loans $ 750,000 b, City Hall Construction (portion) 650,000 .- c, Gateway Improvement Projects 2.700.000 $4,100,000 - Excluding the impact ofthese three items would result in an overall spending increase of - $258,316 (2.5%) over adopted 1997 budget levels, - 1998 Budget Process - The following will document the 1998 budget process and provide a brief commentary on I' specific budget items that have led to the current proposed 1998 net levy of $ I ,864,320, which reflects a 1.9 I % or $35,000 increase over the comparable adopted 1997 net levy. Date Description Commentary 1 1. Spring, 1997 1998 Pay Plan . City Administrator plan and review by Department - assume 1 3% range move 2, Spring, 1997 Capital Improvement . Staff begins development of a I Plan (CIP) Five-Year CIP by Department 3. May 19, 1997 Council Budget . Council establishes a 0%-3% 1 Worksession levy increase target range with a preference for 0% .. I . Preliminary Levy - Payable in 1998 . September 3,1997 Memorandum Page Three Date Description Commentary 4, June 16, 1997 Council Budget . Focus on 1998 CIP items including Worksession City Hall, PMP, playground equipment . Review 1997 Legislative Changes and impact on 1998 Budget 5, July/August 1997 Department line . Staff develops detail line item item Budgets budget for City Administrator review 6. July 21, 1997 Council Budget . Council reiterates support for , Worksession 1998 - 2002 CIP as previously presented . Inclusion of Winter Trail Maintenance . . Consider Code Enforcement/Intern . Consider Preparation of Future Five-Year Plans for SWM Projects, - Ditch Cleaning, and Sanitary I Sewer Line Televising 7. August 18, 1997 Council Budget . Presentation of 1.91 % levy I Worksession . Review 1998 CIP, City Hall, GBD Improvements, Bond Issuance, I Highway 96, Comprehensive Plan, ~md Intern I 8. September 8; 1997 Regular Council Meeting . Council to consider adopting Budget Agenda Item Preliminary Levy I . Council to set Truth in Taxation Hearing dates I 9. Prior to Certification . Certification of Preliminary Levy September 15, 1997 to Ramsey County Auditor . - I -------- ~ Preliminary Levy - Payable in 1998 September 3, 1997 Memorandum Page Four . Date Description Commentary 10. October/November Budget Review . Preliminary Budget available for 1997 citizen review 11. October 20, 1997 Budget Worksession . Discuss Economic Development Authority (EDA) 1998 budget and funding 12. November 17,1997 Budget Worksession . EDA Follow-up . Incorporate any post-Preliminary Levy Adoption changes ~ 13. December 4, 1997 Truth in Taxation . Army Reserve Center Initial Hearing 14. December 11, 1997 Truth in Taxation . Army Reserve Center Continuation Hearing (If needed) 15, December 15, 1997 Truth in Taxation . Army Reserve Center . Adoption Hearing - Adopt Final Net Levy - Adopt 1998 Budget - Adopt 1998 EDA Budget - 16. Prior to I December 29, 1997 Certification . Certification of Final Levy to Ramsey County Auditor 17, January, 1998 Budget Document . Publish Budget Document I Recommendation 1 Staff recommends that Council consider adopting Resolution No. 97-41, "Resolution Clarifying Proposed Sums of Money to be Levied for Levy Year 1997; Payable in 1998," at the September 1 8, 1997 Council meeting, BF!sls 1 1 .- -. 1 . CITY OF ARDEN HILLS RAMSEY COUNTY e STATE OF MINNESOTA RESOLUTION NO. 97-41 RESOLUTION CLARIFYING PROPOSED SUMS OF MONEY TO BE LEVIED FOR LEVY YEAR 1997, PAYABLE IN 1998 BE IT RESOLVED by the Arden Hills City Council that the following proposed sums of money be levied for levy year 1997, payable in 1998 upon taxable property in said City of Arden Hills for the following purposes: LEVY BEFORE LEVY AFTER HACA/LP A HACA LPA HACAlLP A , General Fund $1,967,83 I $ 90,683 $12,828 $1,864,320 . PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 8TH DAY OF SEPTEMBER, 1997. ~ . I DENNIS PROBST, MAYOR I ATTEST: I I BRIAN FRITSINGER, CITY ADMINISTRATOR I Ie MolUSERSISllEILAICOUNCIL \RESOL U1i97-41.RES I I ,.. . CITY OF ARDEN HILLS . MEMORANDUM DATE: September 3, 1997 TO: Mayor and City Council FROM: Brian Fritsinger, City Administrato~ SUBJECT: 1997 Truth in Taxation Dates In addition to certifying the Preliminary Levy to Ramsey County for proposed taxes payable in 1998, the City is also required to select Truth in Taxation Public Hearing dates. The selection of Truth in Taxation public hearing dates is complicated by the fact that the City hearing dates cannot conflict with previously selected dates by the county, school districts and metropolitan special taxing districts. Specifically, December 1,2,8,9,10,16 and 17 are not available. Also, the process must occur within the period from November 29, 1997 to December 20, 1997, This time frame basically precludes the use of any regularly scheduled Council meetings (i.e., - November 24, December 8, or December 30). During 1996, the City Council also scheduled its hearing dates for similar Thursdays as identified below. Recommendations Staff would recommend the adoption of Resolution #97-42, adopting the following Truth in Taxation Hearing dates: - 1. Schedule the Initial Hearing on Thursday, December 4, 1997 at the Army Reserve Center. I 2, Schedule the Continuation Hearing (if needed) on Thursday, December 11, 1997 at the Army Reserve Center. . 3. Schedule the Adoption Hearing for Monday, December 15, 1997 immediately following the Council Worksession. I I BF/sls I .. . .. CITY OF ARDEN HILLS RAMSEY COUNTY . STATE OF MINNESOTA RESOLUTION NO. 97-42 RESOLUTION ADOPTING TRUTH IN TAXATION PUBLIC HEARING DATES FOR PROPOSED 1998 TAXES PAYABLE BE IT RESOLVED by the Arden Hills City Council that the following Truth In Taxation Public Hearing dates, time and places for proposed property taxes payable in 1998 be certified to the Ramsey County Auditor and that notice of the Public Hearings be published in accordance with Minnesota Statute. . Public Continuation Hearing Hearinl: (If Needed) Adoption Hearinl: ! Date: December 4, 1997 Decem ber II, 1997 December 15, 1997 Time: 7:30 PM 7:30 PM 7:30 PM Place: Army Reserve Facility Army Reserve Facility Army Reserve Facility . (Classrooms) (Classrooms) (Classrooms) 4655 N. Lexington Ave. 4655 N. Lexington Ave. 4655 N. Lexington Ave. Arden Hills, MN Arden Hills, MN Arden Hills, MN - PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 8TH DAY OF SEPTEMBER, 1997. !! ~ I DENNIS PROBST, MAYOR ATTEST: I I BRIAN FRITSINGER, CITY ADMINISTRATOR I I. M:\USERS\S HEILA \COUNCIL\RESOLU1\97 -42.RES I .. 'YO CITY OF ARDEN HILLS . MEMORANDUM DATE: September 5, 1997 TO: Mayor and City Council FROM: Brian Fritsinger, City Administrator ~ SUBJECT: 1998 Preliminarv Budl!et Background At the August 8, 1997 Worksession, discussion on the 1998 budget detail was held. These discussions solidified a number of questions raised by City Council and staff, and also allowed staff to prepare the preliminary budget and preliminary levy. I The City is mandated to adopt a preliminary budget by Minnesota Statutes 275.065, Subdivision 1. It states that the City must adopt the preliminary/proposed budget for the upcoming year by September 15, 1997. The preliminary budget is not subject to the same restrictions on subsequent increases as is the . proposed levy, The actual budget amount certified by the City during the official adoption Truth in Taxation hearing may be higher or lower than the amount the City adopts now. The budget may remain flexible during the year. Services and Programs The proposed budget and tax levy was prepared with the objective of maintaining existing .. service levels. Although no major service level changes are proposed, the budget does place more of an emphasis on core services such as police protection, street maintenance, snow removal, and code enforcement. The City is proposing to add the snow plowing of park trails - during the winter of 1998. ~ - Staffing No changes are recommended for full-time City staffing levels (i.e.; 20 regular full-time, I - regular part-time). However, an intern has been recommended for assistance in the areas of I Planning and Zoning, and Code Enforcement. Additionally, the Public Works Department is planning on the use of two (2) temporary maintenance employees in 1998, instead of the three (3) planned for in 1997. I General Fund/Levy Implications For taxes payable in 1998 and 1999, the City is under levy limitation, The legislation I establishing the levy limit provides for adjustments to the City's base levy for the implicit price deflator and the change in households. These adjustments would have allowed up to a $40,528 I. increase, I ,., - Memorandum - 1998 Preliminary Budget Page Two September 5, 1997 . Overall Expenditure Analysis As identified in the report explaining the 1998 levy, most of the budget expenditure increases are reflected in increased Capital Improvement spending. These include City Hall, Gateway Business District, Pavement Management, etc, Recommendation The City Council is asked to adopt Resolution #97-44, adopting the preliminary 1998 budget. BF/sls I . - ~ - - 1 I 1 .1 1 - CITY OF ARDEN HILLS RAMSEY COUNTY e STATE OF MINNESOTA RESOLUTION NO. 97-44 RESOLUTION ADOPTING THE PRELIMINARY 1998 BUDGET WHEREAS, Minnesota Statutes 275.065, Subdivision I, require the adoption of a preliminary budget for the upcoming year by September 15 of each year; and WHEREAS, the City Administrator has prepared a proposed 1998 budget, and the Arden Hills City Council has met several times for the purpose of discussing the 1998 budget. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Arden Hills, Minnesota, that the following preliminary 1998 budget be adopted in compliance with Minnesota Statutes 275.065: Revenues Expenditures and , and Transfers In Transfers Out General Fund Taxes $1,825,710 General Government $ 529.270 Licenses & Permits 196,850 Public Safety 965,245 Intergovernmental 321,311 Public Works 526,905 Charges for Services 29,100 Parks/Recreation 312,275 . Fines and Forfeits 26,000 Other Financing Uses 182,550 Miscellaneous 48,470 Other Financing Uses 78.000 Total General Fund $2,525,441 $2,516,245 Special Revenue Funds $ 191,565 (Community Service $ 471,230 Program, Parks, Cable, TCAAP) Debt Service Funds $ 200,000 (Advance Refunding) $ 900,000 _. Capital Project Funds $ 262,790 (Non-Assessable Road $ 2,065,500 Improvements, Muni- - cipal Land, PIR, DevJ - Redev., Capital & Fire Equipment Sinking) - - Net Total Government Funds $3,179,796 $5,952,975 I I Ie I ----- ----------- ---- - Resolution No. 97-44 Page Two September 8, 1997 1997 Budget = $5,236,262 . 1997 to 1998 Increase = 13.7% The net total Governmental Funds for both 1997 and 1998 include all assessable project costs and exclude enterprise fund expenditures, PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 8TH DAY OF SEPTEMBER, 1997. , DENNIS PROBST, MAYOR ATTEST: BRIAN FRITSINGER, CITY ADMINISTRATOR . M:\USERS\SHEILA \COUNCIL\RESOLUT\97 -44.RES -- - - - - 1 1 _I 1 ------- CITY OF ARDEN HILLS . MEMORANDUM DATE: August 28, 1997 TO: Brian Fritsinger, City Administrator FROM: Dwayne Stafford, Public Works SuperintendeD SUBJECT: 1998 Street Improvement Project Attached is City of Arden Hills Resolution #97-43, regarding the 1998 Street Improvement Projects, This is a resolution receiving the preliminary report and stating that informational meetings and public bearings will be held at a later date for the 1998 Street Improvement Project. The attached report addresses the reconstruction, bituminous overlay, and seal coating projocts identified for 1998 in the City of Arden Hills Five Year Street Improvement Plan. In addition to those streets, the two (2) streets dropped from the 1997 Street Improvement Plan are included: Harnline Avenue North, from County Road E to the dead end; and North Snelling Avenue from Arden Place, north to the cul-de-sac. Round Lake Road, south from Highway 96, and Stowe Avenue, between New Brighton Road and Cleveland Avenue, are also part of this . report. Costs The total estimated costs of all those improvements addressed in the report are $2,516,475,00, which is much higher than the City typically spends each year. The Public Works Superintendent realizes the final costs will be determined after Council receives input from informational meetings and public hearings, At this time, the exact scope of work will be determined. Recommendation - The Public Works Superintendent recommends Council adopt resolution #97-43 receiving the Preliminary Report in the matter of the 1998 Street Improvement Project. - - - I I- I STATE OF MINNESOTA COUNTY OF RAMSEY CITY OF ARDEN HILLS - RESOLUTION NO. 97-43 A RESOLUTION RECEIVING PRELIMINARY REPORT IN THE MATTER OF THE 1998 STREET IMPROVEMENTS PROJECT WHEREAS, pursuant to resolution of the Council adopted August 11, 1997, a preliminary report has been prepared by Howard R. Green Consulting Engineers with reference to improvement of various streets within the City of Arden Hills, and this report was received by the Council on September 8, 1997; and WHEREAS, the report provides information regarding whether the proposed project is necessary, cost-effective, and feasible; and , WHEREAS, informational meetings and public hearings will be scheduled to gather public input regarding the improvement at a later date. NOW, THEREFORE, BE IT RESOLVED, BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS, MINNESOTA: 1. The Council will consider the improvement of such streets in accordance with the report . and the assessment of abutting property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes Chapter 429 at an estimated total cost of the improvement of$2,516,475. PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 8TH DAY OF SEPTEMBER, 1997. DENNIS PROBST, MAYOR - - ATTEST: - - BRlAN FRlTSINGER, CITY ADMINISTRATOR - I -, I I I REC~i\!t::D IMS~ SEP 04 1997 -- Howard R, Green CompanyCITv OF A~Wtli HiLLS (DISILT1\GtlGl\IT.R.\ CONSULTING ENGINEERS Formerly MSA I Consulting Engineers I September 5, 1997 File: 800870 I Honorable Mayor and City Council I City of Arden Hills 1450 West Highway 96 Arden Hills, Minnesota 55112 I RE: 1998 STREET IMPROVEMENT PROJECT - I Dear Mayor and Council: Please find attached, 14 copies of the preliminary report for the 1998 Street Improvement I. project. As the City has historically done in the past. we anticipate holding informational meetings late this month, with a public hearing scheduled for the second Council meeting in October. This will allow staff to obtain input from affected residents and respond to some of those concerns prior to a formal public hearing. Moreover, it will provide valuable information to I the Council in the selection of streets for inclusion in the 1998 project. I will be present at the September 8, 1997 council meeting to address any questions or I concerns you may have. In the meantime, please contact Terry Maurer with any questions that arise prior to the Council meeting. " I Sincerely, Howard R. Green Company I -- ~ I cc: Mr. Brian Fritsinger, City Administrator I GHS/et Enclosures , .. O:\proj\8008701ll70-0302,sept I - 1326 Energy Park Drive' St. Paul, MN 55108 . 612/644-4389 fax 612/644,9446 toll free 6001888-2923 . , '. , , , , FEASIBILITY STUDY FOR 1998 STREET RECONSTRUCTION AND , MAINTENANCEINWROVEMENTS ARDEN HILLS, MINNESOTA , SEPTEMBER 1997 , -. I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of - Minnesota. 4 , 05 ~ \e>f')i Date , , Reviewed by: ~)Jf~) Terry J. er, P.E. , RegNo. 15316 , '. Howard R. Green Company 1326 Energy Park Drive , Saint Paul, MN 55108 Phone #: (612) 644-4389 Fax#: (612) 644-9446 , - - , '. TABLE OF CONTENTS , I. INTRODUCTION .......................................................................................................... I , II. PROJECT SCOPE ..........................................................................................................3 , III. FEASIBILITY, COST -EFFECTIVENESS, AND NECESSITy................................... 3 IV. EXISTING CONDITIONS AND PROPOSED IMPROVEMENTS ............................3 , V. OTHER ISSUES ........................................................................................................... I I , A. PERMITS...........................................,.............................................................. 11 B. EASEMENTS AND RIGHTS-OF-W A Y.........................................................12 ,. VI. ESTIMATED COSTS ..................................................................................................12 VII. FINANCING.................................................................................................................14 ,. VIII. PROJECT SCHEDULE................................................................................................ 17 -. IX. CONCLUSION ............................................................................................................. 17 - APPENDIX A - Pavement Condition Indexes (PCI) Report II APPENDIX B - Cost Estimate Tabulation , , , , iii '. II , FEAS.800-870 i 800870j-0030 , '. I. INTRODUCTION , On August 11, 1997, the Arden Hills City Council initiated the Minnesota State Statue 429 process by adopting Resolution 97-40, authorizing Howard R. Green Company, , Consulting Engineers, to prepare a feasibility study for the 1998 Street Reconstruction and Maintenance Improvement Project. This feasibility study will address the reconstruction, bituminous rehabilitation, and seal coating of selected streets within the , City of Arden Hills. The selected streets proposed for reconstruction, bituminous overlay, and seal coating are shown on Exhibit I and presented in the table below. , TABLE 1 1998 STREET RECONSTRUCTION AND MAINTENANCE IMPROVEMENTS A. RECONSTRUCTION , STREET FROM TO LENGTH (ft) Valentine Court Valentine Avenue Cul-de-sac 510 Fairview Avenue County Road F Gramise Road 1,300 ,. North Hamline Avenue County Road E Dead End 890 (service road) (north) ,. North Snelling Avenue Arden Place Cul-de-sac 850 (service road) Indian Place County Road E Cul-de-sac 150 -t Edgewater Avenue New Brighton Road 3 lOft west of Prior 1,170 Avenue - Stowe Avenue Cleveland Avenue New Brighton Road 1,330 'I West Round Lake Road Highway 96 13111 Street N.E. 3,500 B. BITUMINOUS OVERLAY STREET FROM TO LENGTH (ft) , Thom Drive Cleveland Avenue New Brighton Road 2,170 Edgewater Avenue 310ft west of Prior Cul-de-sac 890 , Avenue GIenpaul Avenue New Brighton Road Cleveland Road 2,400 Sandeen Road Lake Johanna Lake Johanna 1,300 , Boulevard Boulevard Lake Lane Lake Johanna West End 1,210 Boulevard ., C. SEAL COATING STREET FROM TO LENGTH (ft) Glenhill Road Highway 5 I Asbury Avenue 1,100 , Crystal Avenue Fairview Avenue County Road F 1,050 Dellview Avenue Crystal Avenue Gramise Road 490 '. Norma Circle West Floral Drive Cul-de-sac 350 Gale Circle West Floral Drive Cul-de-sac 560 James Circle West Floral Drive Cul-de-sac 900 , Dunlap Street Red Fox Road Grey Fox Road 1,360 , FEAS.800,870 I 80<l870j-0030 --'-f&-------------- - ^ ~^~ ~q ~ w ~ i ~ TWIN CITI S O~DNANCE PLANT; ;"~l\ / ! -J ~~ d r" /I II / ~~~ ; """iil'"'; ~l~} mIlD... . (UTH ~ I II Al:>- \ I = ~~ --! 1IIl1I!;IlU 'i: ~ -'! ....~"II ;. I P .2' mm -!!!:' 0$ ~ 1').--;"'" If' iii ~.;II ~ 1~ ~ ~:.;):m~~r'~~ ~;... l". ~ I . 0 ~.. 1fr " uw>-:: ~ !!l !i! >- 'ou ~ \ 1 c:y..;- ~ Ii., · ~~!i P ..11l!~#IIIlGl "--'- ".;:\ < . ' '\ ~T' ~ "'_ . ~ "\+ ~ n ,.< . rTTf 1 .,.'\ ~~.w; ~ .1 ' " ~;>- r--r_ . ; I . ~ \ ~ r= ~ ~ I-'",:~i~ IldWl ~ ='" \\ /f-- \'2 ~ lID,"",,'" ~~I'I '- - 'LD~" (~ \ II ~ >,\ ~~ rF '" .'- "..UJ /1 -,/;> J /;0<< L "'H ~ .../V.... W)!/ ~:::::: "_T~' / ./ -e ;do /< "'" -'] 0 r= // / ~ ~ ;" 1 ~ =l\ n1~ ~ 9''V i i '0') \(', P~a\E / J~ \MmI ~r ~ I II VV ~\"d::q 0.1 ==,-s-:::::_I~ '~l VIII",""",," ~ ~ ~~~~ 1 J~ll---l V\ (". III IfflH (? '~~'" ~TN G~~,= I) \ '\ ~~ ~. ~. .."') ~\ ~~;, ~ '~-~I c- 1 \ ~ ~ t~\ ~~,,~> '\ ~ L ~ C:i \ II -{EnJ ^ ~l ~o 'a;~.$" " ~ ~ Y II e >-. '1\1' g \ II 'IA. BE1HEL \ ~ ~ ~ \ " · " If--' = II, ___ --\ \" g!B;ll.mj'~ ,."., Ii ~~C, ~~ \ '-ilI::fl-,t:tEEEmJ~ ", , II J) "",,6 '\..... '<. c" II ,.-,.- JL-{5 ~J(c-", .L~~ U (( ""0;00" ir-1'1 i'tEle:2 \.... ..... ').....'~!ii:..L - ;- _~.A!t. '~', L - b ,--- !g,A \ ~v~"' ............~ ~t)~" 4J ~-- ~1I.) i _ =-RECONSlRUCT 11 'tJ""'- ~ ~~ \l~ --'lWERLAY il 0 J t; "\> rP........., ; = SEAL COAT R T\ !'~, 9J- xr-, :,\)(J ....,=-_. 1/ I=::: "'~ 114 \ >0 ~H ~ Q ~IA.~I =-d ~ ,4fr.. l- '...Y r.v--- I'}) , ..c-:r Y;:Y i! . - I' K .< sf ,'" ',.'V ~ 1;; ;:c-- -- '\. =~ ,; ~ ~ 5~'.~1 //'T ~ ilJJ ~ ti. r--:=; r-'/ IV; ,--,U '< : # \ ~;;~' I \ ~ ""I.'. }----Lj J ~" ,t~", ~x? ,,$....1 ~;--~" ~,.~ .' ,;--Y~~rnlrm/" ..~I~ il m .&. 7' - j ~ ' (j ~~ 'COOHTV~ 1\.\\r77\\ f), ~I;: ~ ~ ". ~ j ~a-;\d~~ ~ II~#J~ ~~~ .+' ... ~ ~,~ ~ .r '""" I ~U~ STout J~~ .. / ~.r\ ~~ .A ~ ~ .~ r---1 ~V . ~~ ~J ~~~Q Igj~ ill "J'"""'( ~~$ <<?ill:! ~ ~~i~ 'llJjf :WM #!t ~ /,. ( f-4A \:;::- ~ f" / ~ ~ tw.ll ~ ,,," ~ 7,( L 'H-"S::</m ~~-'.~ ~ . ~ ~ - ~ 1/.... \...-: II: ~ [r Lb........d I . Y I ,,>.> , . " "'c"" ... ~'E- I I - 'E." ~ \ I \ --- - J OS T I H .::-. (,-) a ~ '1 ........ ~ 1998 STREET IMPROVEMENTS -t'v'v~ ~ ~~GREN~= Compcny EXHIBIT 1 ~Q<V+' -= _ I AHt998 ~ . . -- ..... - -- . I '. II. PROJECT SCOPE , This study will analyze the feasibility of reconstructing, overlaying, and seal coating , numerous streets within the City of Arden Hills. The study will discuss the existing conditions of each street, proposed improvements, estimated project costs, proposed financing methods, and project schedule. , In an effort to prioritize street reconstruction, public opinion from potentially affected residents will be solicited in addition to City staff and engineering input. For this reason, , an informational meeting is proposed early in the project process to gather information prior to initiating the formal project design. As the project progresses, more detailed information regarding subsurface soil conditions, utilities, and specific drainage issues , will be addressed in a follow-up report to the City Council. III. FEASIBILITY, COST-EFFECTIVENESS, AND NECESSITY , The proposed improvements are necessary to maintain City streets and are in accordance with the City's Pavement Management Program (pMP). The improvements proposed , represent the 1998 phase of the City's ongoing PMP with the addition of North Hamline Avenue and North Snelling Avenue which were eliminated from the 1997 Street ,- Reconstruction and Maintenance Improvements. The streets that have been identified for reconstruction, overlaying, and seal coating have been reviewed and rated to determine the level of maintenance required. , The improvements proposed within this study will be developed into a project large enough to ensure a competitive bidding process. Therefore, based on the data collected in the rating of streets and the information contained within this study, the proposed , improvements are necessary, cost-effective, and feasible from an engineering standpoint, and are in accordance with the City of Arden Hills' standards. , IV, EXISTING CONDITIONS AND PROPOSED IMPROVEMENTS ,. The City of Arden Hills uses a comprehensive Pavement Management Program (PMP) to rate all City streets. The American Public Works Associations (APWA) MicroPA VER software is used to reduce field data into a Pavement Condition Index (PC!) rating on a , scale from I to I 00. Streets are then selected for maintenance, rehabilitation, or reconstruction based upon the PCI rating, Department of Public Works history of maintenance, field observation, and engineering judgement. - All of the City's streets were rated in October and November of 1995 using the --. MicroP AVER software. The data collected in the field consists of 19 different types of - pavement distress and the level of severity of each one. The different types of distress ----. include longitudinal and transverse cracking, alligator cracking, bumps, potholes, and weathering, among others. Based on this collected field data, the computer program generates a PCI rating for each street. The streets are then prioritized for various ~ maintenance procedures or rehabilitation. Streets with PCI ratings of 0 to 60 are candidates for reconstruction ranging from complete reconstruction to cold and drainage in-place recycling (CIR) or bituminous reclamation, depending upon subsurface -.. FEAS.800-870 3 800870j-0030 - ,. conditions. Those streets with ratings in the range of 6 I to 80 are candidates for rehabilitation in the form of a milling operation, followed by crack sealing and the , placement of a 1 Y:.-inch bituminous overlay. F inaIl y, streets rated above 80 are candidates for crack sealing and seal coating as preventative maintenance. , The PCI report for all City streets is included in Appendix A. To facilitate the use of the PMP, the streets were organized into five zones based upon their geographic proximity to , one another. These zones are divided by the major highways passing through Arden Hills. The pavement management zones are presented in Exhibit 2 and are generally described as follows. , ~ Location , 1 North ofI-694 and east ofTH10 2 North ofI-694 and west ofTHIO 3 North of the Soo Line rail easement and , south ofI-694 and west of Snelling Avenue 4 South of the Soo Line Rail easement and west of State Highway 51 . 5 South ofI-694 and east of State Highway 5 I ,. Zone 1 Street Improvements The proposed improvements within Zone 1 consist of seal coating Norma Circle, Gale Circle, and James Circle. The PCI ratings in 1995 for these three streets were 90, 87, and I 94 respectively. These ratings indicate that the streets are candidates for crack sealing and seal coating as preventative maintenance. I Zone 2 Street Improvements The proposed improvements within Zone 2 consist of reconstructing West Round Lake I Road from 13th Street to Highway 96. West Round Lake Road is a 24-foot wide bituminous roadway with a limited amount of concrete curb and gutter and no storm drainage facilities. The west side of the road drains to the Mn/DOT right-of-way ditch I and is collected by Mn/DOT storm sewer. Ditches along the east side of the road drain runoff to the south. The existing drainage patterns appear to be very poor with runoff I ponding in the ditches on the east side of West Round Lake Road. The roadway was overlaid in 1991 under the City's PMP and the surface remains in good I condition with a PCI rating of 88 in 1995. This segment of roadway is designated a Municipal State Aid Street (MSAS). Due to the current development of the Gateway Business District, it is recommended that West Round Lake Road be reconstructed to I. MSAS standards, to increase the level of service and improve drainage. The reconstruction of West Round Lake Road requires a minimum width of 36-feet, with B6 I 8 concrete curb and gutter and storm drainage facilities. Preliminary traffic volume I projections are included within the May 1997 Gateway Business District Feasibility Study that classifies West Round Lake Road as a high density collector roadway, providing a high level of service, having moderate operating speeds (30 mile per hour I design), and providing a high level of traffic mobility. FEAS.800.870 4 800870j4l030 ._- ----- -- _ _ -__riii"'_rlr.................___ CD o o CD ~ i - L . ; i d ~i ! - \ TWIN CITIES 0 DNANCE PLANT roN ; 0 ~ 00 =', C Z ~ \ 1JIIII::i~~ ~rr1 8 ~~\ ~ ~ V~ ".~ I ~ ~,'\ 4' 6~ 00 ~/ ~ ~[H~ t:/ I (\'-J / I _L'~\..~ lii""~ >om'" ~"~ I rG\ f ~ onlHl-",~~.. J/~R z - on.,,'?>.!..!iJ 1111 0 ~ C' --, mm U/J]"I/I!f1f' m. 5- iQ :r: ~ ----l /-1lIIl1Il miiimm I11It (( 1-" CI ~ r.......,,:.!IlII1D '6l\I. .., ~ ~ ~ N ~ ! ....:;..;; mm .,,'~~:i mm ~')/X'<A' I - ~ ~i! 0 ?-\\ II '?>~~II" ~~~~~ I z p~Z< \~\!T l~r:~~I~ ~~, ~ I ~\ ~\IF \\ \_~~~ III I \) ,,,=:=,, "T!!~:~ ~ ~~; \ ,~~~ ~ L =- ~ """'lIE' ~ ~"~.. n ~ ~l~ / '---'-....1 fOI I -<:5 ) I .. *- ) 1:J::2Y. iJ; -.......,......,... " ,~ "" "'\ J \.\~:,;;: ~ '" ~~ N1' lJ i ..,.....'............\.\~~. V'r ~ _" r---------....',.., .. "<.L CJ A , '1:--" .."-,,~ ~ 7\.... N'lll( H ~<~ ~ ~~ ~(]] ,... ... ~ ! 7 \ ~ \-1 '>/ Z \ II BE >-. ~II h$ / i "- . "t:I,j;gj ~'1E \\\\~_ < . .... _____ "\ \~, mi1ffi "'<"""< II Ib:~( )......;.........~ ....... t ~. ~ ....,..1. ~ !/" ....... \ '\ i J4:1 ~r ~ ~l ~<>_ ~ ((., _,~_ It- ~ ; ;bP'~ \\~ ''''"'''' '-i'/'" ~ ~o ~'~~~~I' L i = b i ~IDi ~ ~e-s ''/ ~~ c:f:J ~ i = ~ ",II.>, ~~i' ?i ~~,-~ =sJ1 ""m'~' / ~ ~~,,~ \ "<~ ~ cv.l---- ......-1.w.I.J.r r-"-' =------ ~.& 4!- ~'< iTl:W J 1;;.....1 .. . :.w y,,:;:: '!' \\. I' "\ ,....;.- r:u. ~ o =3 ~ ,) .".-------~ pl' '0 ,'i:=; -j~ """,a... 1 -, . Ii i.~~ I~~~) \ \~~I'iiJ~I. r~ if '\- 01-2 i~ f' ~ T" "" ~ ~ I 1/ m ~ ~~~. rI J?" ~T 1 ~)l\~.i (! I - ~ ~ 0 ~~td.;..... lIl.. (~ ~ ~1f-H1im. I J; ~ \~i/I ~ J ----' <z \'F;i\ \~ ~, - 'llWillulll'-'N~~ m !~ ~... . ~ ~~ ~II ~ ~N ~ I~=~ N:JJ~ AVE ~~ ~ ~.llll ~ ~ Cf.I i /%f~ /f\~ ~ ~'>~, Jl- J b ~~ II1II ~_ ~~~~ rrl rnfli~ i II-L mm~~ ~' '\,.~l L, .~ .. ~ X zm ~ 7iHT rU-l-jlfIIIIIlIIJiV ,;:-..... ...~-' wm~... t '. 1iIl..." ::r: -I -I lIllJJ,IMWL', " J . ,,-> ~ ' , < < I" - en ~rmTTT1lIIITJ:'i~ r--:' ;,,";...... ~ ~O'$Ef'\'\\" Ii CD DIIlIlll:::!J:J []]]]]]]]]llU" Ie ---- '::II . . L:::::l \--l ~ --t I~I COUtlTY R<WI "0- ,,------, ""II /ct.D*lURD.\.\' " ',COJlfJ,:'rrr , ,- West Round Lake Road is proposed to be reconstructed with a center median providing , left turn lanes between 14th Street and Highway 96 as shown on Exhibit 3. The portion of West Round Lake Road south of 14th Street is proposed to be constructed as a typical , 36 foot wide commercial-industrial section, also shown on Exhibit 3. The preliminary pavement design has been generated based upon the geotechnical , investigation completed as part of the Gateway Business District project. Based upon projected traffic volumes and an assumed R-value of 20, the pavement section will consist of 4 to 4-I/2-inches of bituminous, a I a-inch gravel base, and an 18-inch select , granular subcut with HDPE edge drains to remove subgrade moisture from the roadway. The proposed storm drainage improvements along West Round Lake Road, shown on , Exhibit 4, consist of instaIling approximately 3,700 linear feet of RCP storm sewer ranging in size from IS-inch to 27-inch, catch basins, and manholes, This proposed storm sewer will be extended from the storm sewer system proposed to be constructed as , a part of the Gateway Business District Improvements and will drain southward to the stormwater pond included in the Gateway Business District project. At the time of this study, the Gateway Business District Improvements project has not been awarded. ~. Zone 3 Improvements Zone 3 improvements consist of reconstructing Fairview Avenue and Valentine Court, rehabilitating Thom Drive, and seal coating Crystal A venue and DeIlview Avenue. .......- - Fairview Avenue ... The portion of Fairview Avenue to be reconstructed is between Gramise Road and - County Road F. Fairview Avenue had PCI ratings of 21 and 23 in 1995, '"' indicating structural failure. The street has extensive alligator 10ngitl1l'Iinal, and edge cracking. Existing storm sewer is located at County Road F and Crystal . Avenue. , - It is proposed to reconstruct Fairview Avenue to a 32-foot wide bituminous street with B618 concrete curb and gutter as shown on Exhibit 5. The proposed --. pavement section consists of 3.5 inches of bituminous. 8 inches of gravel base, - and a 12 inch select granular subcut with HDPE edge drains to provide for the drainage of the subgrade. A geotechnical investigation will be competed as part of the final design to verify these assumptions. Proposed storm drainage improvements consist of extending IS and 18 inch RCP --. storm sewer south from Crystal A venue to Gramise Road to facilitate the future - drainage of Gramise Road. The north part of Fairview Avenue will drain to the =-e County Road F stormsewer system with the installation of a catch basin at County Road F and Fairview Avenue being required. --... -wi FEAS,1lOO-870 6 800870j-0030 _.------- - --..- ..- _._~ _.~.~ - - _.--- , ROW ROW , SO' MIN.R/W REQUIRED , 2' 25' 10' 4' 25' VARIES IN. TURN roo" "" lANE , CURB & GUTTER 2,00%_ , _. 4"J .. 2" 2331 lYPE 41A BITUMINOUS WEAR COURSE DRAINTILE TACK COAT (lYP) 2 1/2" 2331 lYPE 31B BITUMINOUS BASE COURSE , 10" ClASS 5 AGGREGATE BASE 115' GRANULAR SUBCUT , TYPICAL BOULEVARD SECTlON WEST ROUND LAKE ROAD ( NORTH OF 14TH ti I Ht;t; r N.E. ) ,. ROW ROW - 60' ....-. - Cf. 6' lS' lS' lS' , B61S CONC. - CURB & GUTTER .,. 2.00%_ .. , - .. 4" - DRAINTILE (lYP) 1 1/2" 2331 lYPE 41A BITUMINOUS WEAR COURSE TACK COAT 2 1/2" 2331 lYPE 31 B BITUMINOUS BASE COURSE - 10" CLASS 5 AGGREGATE BASE 115' GRANULAR SUBCUT ~ - lYPlCAL COMMERCIAL INDUS'l'RIAL SECTION WEST ROUND LAKE ROAD (SOUTIi OF 14TH STREET N.E.) S00870J . . WEST ROUND ~~[M]O~OU LAKE ROAD . TYPICAL STREET ~ I-bivad R Gee1 Con'ipaly SECTIONS --- CQNSU.llN3 ENGINEERS , - , ~ 0 500 , . , z 0 , f- I (J , - ~ 0::: L{) OJ n , S 0 z w W >- 1S"RCP ~\) ::J Z Z <( 0'0 , w ~ ~ > J: <( 0 0 J: II z w <( f- y..t.. ...J <( ~ f- '- ~ (f) Ii w cr ...J U W f- Z - 24"RCP .. - 27" RCP M\NNES .,. - .... EXIS NG MNDO -- - DRAINAGE DITCH LEGEND: "" EXISTING STORM II!! PROP. CATCH BASIN "~'" WATER POND . "- II PROP. CB/MANHOLE "':;i.. APPROX, 1 ACRE) PROP. RCP STORM SEWER ':;i.." - c "'-" EX. CATCH BASIN ......'" - 0 EX. CB/MANHOLE ........", ~ ..-0(-- EX. STORM SEWER AH089EX . WEST ROUND -. LAKE ROAD ~~[l:{]O~OU - STORM SEWER ~ I-bNat:t R. Geen Compa-ry IMPROVEMENTS ---- --........... .-. -- , , , ROW Cf. R W 13' 13' , B618 CONCRE CU B & GUTTER ,. - 2.00%-- ,. .~. , 0 4" HDPE DRAIN TILE 1 1/2" 2331 TYPE 41A BITUMINOUS WEAR COURSE TACK COAT 2" 2331 TYPE 31 B BITUMINOUS BASE COURSE '- 8" CLASS 5 AGGREGA TIE BASE 12" SELECT GRANULAR BORROW , HAMUNE AVENUE SERVICE ROAD RECONSlRUCTlON SNEWNG A VENUE SERVICE ROAD RECONSlRUCTlON II - II - ... ROW Cf. R W - 16' 16' ..,. - B618 CON RET CU B & GUTTER 2.00~ T ., - 0 ..,. 1 1/2" 2331 TYPE 41 A BITUMINOUS WEAR COURSE 4" HDPE DRAIN TILE TACK COAT - 2" 2331 TYPE 31B BITUMINOUS BASE COURSE 8" CLASS 5 AGGREGATE BASE 12" SELECT GRANULAR BORROW FAIRVlEW AVENUE. VAlENTINE COURT. INDIAN PLACE STOWE AVENUE RECONSlRUCTlON - 80087DJ 1998 STREET ~ J:{ [M] a [gj a lJ IMPROVEMENTS .. TYPICAL STREET ~ fbMro R Geen Canpmy SECTIONS C:ONSULTING ~ -. ---- ~- -- -- , '. V alentine Court , Valentine Court had a PCI rating of 31 in 1995 making it a candidate for ., reconstruction. Significant alligator, block, and IongitudinaI cracking is present along Valentine Court as well as rutting, weathering, and raveling, Bitwninous berm is present with the street draining to an existing CMP storm sewer system at , Valentine Avenue. It is proposed to reconstruct Valentine Court as a 32-foot wide bituminous street , with B618 concrete curb and gutter as shown on Exhibit 5. Proposed storm sewer improvements consist of removal of the existing catch basins and CMP storm sewer, the construction of catch basins to match the proposed curb line, and the , installation of IS-inch RCP storm sewer. Zone 4 Improvements -- The proposed improvements within Zone 4 consist of reconstructing Indian Place, Stowe Avenue from New Brighton Road to Cleveland Avenue, and Edgewater Avenue from New Brighton Road to 310 feet West of Prior A venue. Streets proposed for rehabilitation include Lake Lane, Sandeen Road, Edgewater A venue from 310 feet west of Prior - Avenue to the cul-de-sac, and Glenpaul Avenue from New Brighton Road to Cleveland - Avenue. Glenhill Road is proposed for seal coating maintenance. .- Indian Place ala _1 " Indian Place is a short cul-de-sac south of West County Road E with a 1995 PCI rating of 53. Surmountable concrete curb and gutter exists along the street, - however, it shows extensive cracking and settlement. Surface runoff presently .,. drains to two catch basins located at the intersection with West County Road E. .. Proposed improvements consist of reconstructing Indian Place as a 32-foot wide -- bituminous street with B618 concrete curb and gutter as shown on Exhibit 5. The - diameter of the cul-de-sac will be reduced from 120 feet to 100 feet. Storm - drainage improvements will consist of the removal of the existing catch basins -- and CMP storm sewer, the construction of catch basins to match the proposed - curb line, and the installation of 15-inch RCP storm sewer to facilitate drainage of the street. .,. - Stowe A venue --- The portion of Stowe Avenue proposed for reconstruction is between New - Brighton Road and Cleveland Avenue and will be designated as part of the City's -. MSA system following the turnback of the roadway from Ramsey County. Stowe Avenue is a shared street between the cities of Arden Hills and New Brighton. A PCI rating of 19 was assigned to this portion of Stowe A venue in 1995 indicating that reconstruction of the street is necessary. Severe alligator, block, and -- longitudinal cracking is present along Stowe A venue with weathering and raveling also evident throughout the roadway. There is no storm sewer present - FEAS.800--870 10 800870j.Q030 - - ...... .. ,- along Stowe Avenue between New Brighton Road and Cleveland Avenue; , however, stonn sewer facilities were completed along Stowe Avenue east of New Brighton Road with the 1995 Street Improvement Project to be extended west along Stowe A venue in the future. , Stowe Avenue is proposed to be reconstructed as a 32-foot wide bitwninous street with B618 concrete curb and gutter. The proposed street section is shown on II Exhibit 5. Proposed stonn sewer improvements consist of extending 15-inch RCP stonn sewer from east of New Brighton Road west approximately 900 feet along Stowe Avenue. " Rdiewater Avenue II Edgewater Avenue from New Brighton Road to 310 feet west of Prior Avenue is proposed for reconstruction. This portion of Edgewater A venue received a PCI rating of 57 in 1995. Stonn sewer is not present along this portion of Edgewater -- Avenue with the street draining west towards the cul-de-sac to a stonn sewer system located along the more recently constructed portion ofEdgewater Avenue. ~. The proposed reconstruction of this portion of Edgewater A venue consists of reconstructing a 32-foot wide bitwninous street with 8618 concrete curb and gutter as shown on Exhibit 5. Approximately 1,300 linear feet of 12-inch to 21- inch stonn sewer is proposed to be extended east from the existing stonn sewer to 'I facilitate drainage of the street - The streets identified for bitwninous overlaying are streets that received PCI ratings of 61 to 80 - .. in 1995. These streets typically display moderate levels of distress in the forms of longitudinal, transverse, and block cracking. The bitwninous overlay procedure consists of edge milling the -- streets, crack sealing, and placement of a 1 Yo-inch bitwninous overlay. This operation improves -- the structural integrity of the road surface but does not provide for improved drainage patterns - along the streets. -- V. OTHER ISSUES - A. Permits -- - Several permits will be required as part of the proposed construction. The permits required and the regulatory agencies are listed below: -- - Permit Construction Activity Requirement .' Minnesota Pollution Control Agency (MPCA) Grading and Stonn Sewer - .. Rice Creek Watershed District Stonn Sewer Minnesota Department of Transportation (MnDOT) Street -- Ramsey County Street - FEAS.8Q().870 11 800870j-0030 - - - -. - - ... B. Easements and Rights-of-Way - . Proposed reconstruction of West Round Lake Road will require the acquisition of right-of-way from the adjacent property owners. The area of right-of-way to be .. acquired will be dependent on the final alignment and geometric design of West Round Lake Road. The proposed reconstruction of North HamIine Avenue will II also require the acquisition of right-of-way. The acquisition process for these rights-of-way was begun by the City in 1996. II Temporary construction easements will be secured as is necessary for the proposed construction of storm sewer and streets in areas where the rights-of-way for construction is limited. ,. VI. ESTIMATED COSTS II The estimated construction costs and associated overhead costs have been determined for the construction of the proposed improvements. Construction costs were determined using comparable construction cost data from 1997. In accordance with the City's '. assessment manual, the overhead costs have been estimated as 32% of the total estimated construction cost for each type of improvement, The overhead costs for the North HamIine Avenue and North Snelling Avenue service roads have been estimated at 10% of the total estimated construction cost as the engineering design work was completed for II these two street as a part of the 1997 Street Reconstruction and Maintenance Improvements project. - .. The overhead cost includes city ~dministration, engineering design, construction staking and inspection, land acquisition and legal expenses, and assessment rate preparation. The -- estimated costs are shown in Table 2. -- These costs are primarily presented for the purpose of assisting City Staff and Council in - selecting streets to be included in the 1998 Street Improvements project. A more detailed -. cost estimate for each street is presented in Appendix B. - -- - .." - -. - - .. ~- FEAS.Soo-870 12 SOOS70j-0030 , ,- TABLE 2 , 1998 STREET RECONSTRUCTION AND MAINTENANCE IMPROVEMENTS ESTIMATED PROJECT COSTS " A. RECONSTRUCTION STREET COST West Round Lake Road - Zone 2 $1,213,920 , Valentine Court - Zone 3 $86,410 Fairview Avenue Zone 3 $226,340 North Snelling Avenue - Zone 4 $129,880 , Indian Place - Zone 4 $33,490 Edgewater A venue Zone 4 $260,620 Stowe A venue Zone 4 $274,700 II North Hamline Avenue - Zone 5 $136,010 SUBTOTAL $1,361,370 -. B. BITUMINOUS OVERLAY STREET COST Thom Drive - Zone 3 $34,500 ~. Lake Lane - Zone 4 $21,880 Sandeen Drive - Zone 4 $18,540 Edgewater Avenue - Zone 4 $14,150 II GIenpaul A venue Zone 4 $47,320 SUBTOTAL $136,390 - C. SEAL COAT .. STREET COST Norma Circle - Zone 1 $1,025 . Gale Circle - Zone 1 $1,655 -- lames Drive Zone 1 $2,785 Crystal A venue Zone 3 $3,475 - Dellview Avenue - Zone 3 $1,605 -- GIenhill Road - Zone 4 $3,690 - Dunlap Street Zone 5 $4,480 SUBTOTAL $18,715 -- - RECONSTRUCTION SUBTOTAL $2,361,370 -- REHABILITATION SUBTOTAL $136,390 SEAL COAT SUBTOTAL $18,715 - TOTAL ESTIMATED PROJECT COST $2,516,475 -- - -. . - FEAS.8lJO.870 13 800870j-ooJO -...--- , ,- VII. FINANCING , Seal Coat Financing II The City's current assessment policy states that the application of a bituminous seal coat is a maintenance procedure to be funded by the City. The estimated project cost to the City for the seal coating portion of the 1998 Street and Utility Improvements project is '- $18,715.00. Bituminous Overlay Financing , As outlined in the City's Assessment Manual, 50 percent of the total project cost of bituminous overlay projects may be assessed to all benefitting properties adjacent to II streets to be overlaid. The assessment rate is detennined by dividing 50 percent of the total project cost by the assessable front footage. Table 3 below shows the proposed rehabilitation financing. II TABLE 3 1998 STREET RECONSTRUCTION AND MAINTENANCE ~. IMPROVEMENTS PROPOSED BITUMINOUS OVERLAY FINANCING Estimated Bituminous Overlay Project Cost $136,390.00 Estimated Assessable Amount (50010) $68,195.00 -. Assessable Front Footage 12,540 FF - Estimated Rehabilitation Assessment Rate $5.44 FF .. As shown in the above table, $68,195.00 of the rehabilitation costs will be assessed to --- benefiting property owners at a rate of $5.44 per front foot. The remaining $68,195.00 will be funded with City funds. -- - Reconstruction Financing -- The reconstruction of the selected streets will be funded with the City's pm find, SWM - fund, assessments to abutting property owners, MSAS funds, Ramsey County Turnback funds in cooperation with the City of New Brighton for the Stowe Avenue reconstruction -- and Municipal bondsITIF funds for the West Round Lake Road improvements. The - proposed financing methods for street reconstruction and percentages to be assessed are shown below in Table 4. -- - ~.- ~-. - - - FEAS.800.870 14 80087Oj-OOJO , '. TABLE 4 II 1998 STREET RECONSTRUCTION AND MAINTENANCE IMPROVEMENTS PROPOSED RECONSTRUCTION FINANCING -. A. RESIDENTIAL STREETS STREET ESTIMATED COST ASSESSABLE ASSESSABLE PERCENT COST " Valentine Court $86,410 50010 $43,205 Fairview Avenue $226,340 50% $113,170 North Hamline $136.010 25% $34,002 , Avenue North Snelling $129,880 25% $32,470 Avenue III Indian Place $33,490 50% $16,745 Edgewater Avenue $260,620 50% $130,310 III Stowe Avenue $274,700 25% $68,675 Estimated Assessable Amount $438,577 Assessable Front Footage 8,570 FF ~. Estimated Residential Assessment Rate $51.l8/FF B. COMMERCIAL STREETS STREET ESTIMATED COST ASSESSABLE ASSESSABLE PERCENT COST West Round $1,213,920 35% $424,872 Lake Road , Estimated Assessable Amount $424,872 ~ .. Assessable Front Footage 3,200 FF -- Estimated Commercial Assessment Rate $ 132.77/FF ~ It has been asswned that the assessable percentage for North Hamline Avenue and North - Snelling A venue service roads is 25 percent based on the fact that assessable front footage exists on only one side of each of these roads. Therefore, the City's share for ~ these two roads is 75 percent of the estimated project cost. For Stowe Avenue, 50 - percent of the estimated project cost will be funded by the City of New Brighton with the remaining 50 percent of the cost being split between the City and assessments to abutting ~ property owners. - ----- West Round Lake Road is proposed to be assessed for 70 percent of the estimated project cost in accordance with the City's assessment policy for commercial streets. Because - there is only assessable property on one side of West Round Lake Road, the assessable - percentage was asswned to be half of the 70 percent, or 35 percent. The remainder of the cost will be funded with City funds. -. Table 5 below presents a cost and financing tabulation for the proposed improvements. -- FEAS.800-870 15 800870j.Q030 III <= <= <= <= <= <= <= <= Eo< iii = = iii IJI. .... '" l"- I"- ..:lUQ'J I"- fI'j, fI'j, "" <e:;Eo< ~ 'IS 0 go '-C .... '" Eo<o~ .... r'l '-C .... l;: .... .... fI'j, III o~U .... N N ~ ,. Eo<ll-o .... .... .. 8 .. ,. g <= '"" <= Z :I 0 = '" 0 1:1 '" I() o~Eo<: ..... r'l r: .,.: II Q'J >0",,=< ..... r'l Eo<Z"" - .... Eo< ... S! ~ .... .... ~ U Q =... , ~ Q'J --- ~ ...... 0 <= ~ 'l:I <::! <= 01 N ~ II ll-o ~Q'J~ I"- co go ~ U~~ ~ ~ ... N N ""~ ~~OI "" "" "" ..:l .... .... III u... ~5 ~~'l:I ~""~ OQ'JQ ~. ~~ U~~ Z~ ~ <Eo< I()~" ~Q'J 0 0 <= ""Qi5 <::! '" I() ..:l~U ...~ '" r-: ~ '" ~ Z 0-. l"- - ~"" - '" I"- Eo<~g ""~ .,; .,; 'IS '" ..... <= ... Q~ .... "" I() ...", ..."" .... .... ... Eo<Q ~~ U~ -- ; ~Eo< ~ 0 0 0 <= zQ'J <::! <::! '" I() 08 ~ 1:1 '" '" 0 = Q'J~; - 0-. l"- go U l"- - '" "":. ~ Q U .,; .,; 0 I"- ZQ'J ;.. - '" '" "" -- .... .... "l. "":. ti ~ ~.. - .... ",,,,oo .... .... - >oE:8 ~ E:::~~~ -- ~ U"'Q'J e:.< - go Q'J '" ~ '" .... -- - Q'J Eo< U Z -- ~ 0 0 E: - ~ ll-o Q'J U 0 ; .. -. ~ Q'J .. ~ Q O>oEo< Eo<Q'J :il 0 z<u Q'JEo< 'Ii ZU Q'J ~ U ~;~ ~ -- ..:l o~ < Eo<~~ UO I ~ "" ~~ - Q'J ;loll-o -- , '. vm. PROJECT SCHEDULE , The proposed schedule for the 1998 Street Reconstruction and Maintenance Improvements is based on guidelines established in Minnesota State Statues, Chapter , 429, Local Improvements, Special Assessments, The critica) issues in the progreSS of this schedule are the scheduling of informational and public hearings. This Proposed schedule will be updated as the project progresses. , Receive Feasibility Study, September 8,1997 Order Public Hearing and Informational Meeting , Hold Informational Meetings September 24 - 30, 1997 " Hold Public Hearing, October 27, 1997 Order Preparation of Plans and Specifications , Approve Plan and Specifications, December 8, 1997 Order Project, and Advertise for Bids ~. Open Bids February 3,1998 City Council Receive Bids, February 9,1998 Order Assessment Hearing 4 Hold Assessment Hearing March 30, 1998 - - A ward Contract May 11, 1998 -. - Begin Construction May 18, 1998 -- Complete Construction August 1998 IX. CONCLUSION - - The total estimated project costs are $18,715, $136,390, and $2,361,370 for seal coating, bituminous overlaying, and reconstruction, respectively. As stated before, the cost will be financed through the use of City funds and assessments to benefiting properties. City - resources available include the PIR fund, TIP fund, Stonn Water Maintenance Funds, MSAS Account, Ramsey County Tumback dollars, and available New Brighton funds on Stowe Avenue. Based on the infonnation gathered and the analysis presented, the proposed improvements discussed in this study are feasible from an engineering standpoint. . FEAS,1JOO.870 17 80087Oj-DOJO I I - .. , I I I I APPENDIX A I PAVEMENT CONDITION INDEXES (pCI) REPORT I If" I I I I I I I , ~~. I PCI REPORT : City of Arden Hills se Name : C:ARDHLLS Report Date: AUG/19/1996 etwork 10: All Branch Number: All Section Number: All ~ Branch Use: All Surface Type: All Pavement Rank: All ~ Zone: All Section Category: All Section Area: All III Last Construction Date: All Last Inspection Date: All PCI: All I Netwrk Branch Section Last Last 10 Number Construct Inspection PCI Name NUOVRank/Surf/Length(LFl/Area(SF) Date Date I...._..~~~._-_....._--_...._-_..._.._-_....__.._-_....-.-----...-...-----...-.. 520'1 14 1 I E I AC I 345,001 17865,00 JUL/01/1972 NOV107/1995 14 1-- -.. ,;~~~~:~~ -~~~~.~~~~~~.;~~~~~~: ---.:~~~~:~~~~~;~~~~~_:~~~~~:~~ tl22 1 I E I AC I 625.001 18750.00 JUL/01l1976 NOV/08/1995 37 James Avenue Cat:A Zone:1 Family:OEFAUlT Age (Yrs):19,4 ROADWAY From: Indian Oaks Trail To: Colleen Avenue ....-...---..---------------------------------...--...------------------------ 1520-1 15 1 I 0 I AC I 1985.001 103220.00 JAH/01l1964 NOV/OS/1995 51 Fernwood Avanue North Cat:A Zone:l Family:OEFAULT Age (Yrs):31.9 ROADWAY From: County Road F To: 1985' north I .-----..-...---.....---......------..----...,..-----....-...---..--.....-----. 520-1 34 1 I E I AC I 630.001 29280.00 JUL/01l1978 NOV107/1995 56 Pleasant Drive Cat:R Zone:1 Family:OEFAULT Age (Yrs):17.4 tit -,----~~~~-----~~~~-~:~-~~~~~-,--.--,-------:~~-~~~~-~~::~~:~~~----.--- 520-1 10 1 I E I AC I 2400,001 79200.00 JAN/01/1980 NOV/08/1995 58 Collean Avenue Cat:O Zone:' Famlly:OEFAULT Age (Yrs):lS.9 1Il--.--.~~~~--.--~~~~.~~~~~~-~~~~~..--.-----..-:~:-~~~:~~.~~-....---.. 520-1 11 1 I E I AAC I 205.001 13125.00 JAN/01/1980 NOV/08/1995 59 1Il.-.---;~;;~-~:~:~~~:_~~~:~~_;~~~~::,...:~:;~~~~~~~;~~~::,:~~~~:::~~ 111520-1 12 2 I E I AAC I 210.001 15000.00 JUL/01/1991 NOV/08/1995 62 Dawn Circle Cat:R Zone:l Family:OEFAULT Age (Yrs): 4,4 ROADWAY l, From: Norma Avenue To: East --------------------------------------------.-.------------------------------- 1520-1 01 1 I E I AAC I 218.001 15272.00 JUL/01/1977 NOV/07/1995 64 .AIIi>le Circle Cat:R Zona:l Family:OEFAULT Age (Yrs):18.4 tIl.... --~~~~---..~~~:-~:~-~~~~~-..------.---..:~:-~~::~:~~~-........----- I -- ,I PCI REPORT I Site Name : City of Arden Nills lIIIf"se Name : C:AROHLLS Report Date: AUG/19/1996 Netwrk Branch Section Last Last I 10 Nunber Construct Inspection PCI Name Num/Rank/Surf/Length(LFl/Area(SFl Date Date Use I ............................................................................... 520.1 29 1 I E I AC I 655.001 30130.00 JUL/01/1982 HOV/08/1995 66 Norma Avenue Cat:R Zone:' Famlly:OEFAULT Age (Yrs):13.4 I ~;~~;.;~~~.;..~~~~~~~~.~~:;~~:~~~..;~~~:~~.:~~~~~;;;.;;;~~~~~~~~;~~..~ I ......;~~;~~~~~.~:~~.~~:~.~~;~~~:.::~~::...,~~;~~:;;;~:..~~~-:~~~~::~:~ 520'1 34 2 I E I AC I 850.001 36760.00 JUL/01/1978 NOV/07/1995 68 I Pleasant Drive Cat:R Zone:l Famlly:OEFAULT Age (Yrs):17.4 ROADIIAY From: South cul'de'sac To: Horth cul'de-sac ..---..--------------------.-------------------------------------------------- 1520'1 25 1 I E I AC I 1525.001 59710.00 JUL/01/1978 NOV/07/1995 69 Korth Lake Road Cat:R 20ne:1 Family:OEFAULT Age (Yrs):17,4 ROADIIAY From: Pleasant Oriva To: CUI'de'sac I ....................-......................................................... 520.1 09 1 I E I AC I 2722.001 97992.00 JUL/01/1976 HOV/08/1995 71 lIest County Road F Cat:R Zone:1 Family:OEFAULT Age (Yrs):19,4 I ~!.;;~~~. ;..~ ~~~~~~~~ ~~.;~:~~.. ;~~:~~.:~~~:;~~~ .~:;~;~~..~ McClung Drive Cat:R Zone:1 Famlly:OEFAULT Age (Yrs):16.4 ~~;~~;.;~~~~.;..~~~~~~~~:~~.~;~:~~~~~~~:~~.:~~~~~;;;.;;;~~~~~~;~~";4 I......;~~~~::~~.~~;;~.~~~~~~.~::~::....:~;~~~~~~~;~~~~~.:~~~::.::~ tIl520'129 3 I E I AC I 510.001 19660.00 JANI0111980 NOV/08/1995 75 Norma Avenue Cat:R Zone:1 Family:OEFAULT Age (Yro):15.9 ROADIlAY From: Briarknoll Drive To: Colleen Avenue -----------------------------------.-.--------.-----------------------.-.----- 1520'1 33 1 I E I MC I 596.001 2B124.oo JULIOI11978 HOVI07t1995 75 Pleasant Circle Cat:R Zone:l Family:OEFAULT Age (Yro):17.4 ROADWAY From: Lexington Avenue To: Cul-de-sac I ....................................................................-........, 520.1 05 4 I E I AC I 921.001 31314.00 JUL/Ol/I985 NOVll011995 76 Arden View Drive Cat:R Zone:l Family:DEFAULT Age (Yrs):10,4 I~;~~;.;~~.;..~~~~~~~~;~.~;;~~:~~;~~~;;~~:~~.:~~~;;;;:;~.~~~~~~;~;..~ lIest Floral Drive Cat:R Zone:1 Family:OEFAULT Age (Yro): 4.4 t1t;~~~~~~.;..~:~~~~~~~;~~~.~~~~._~;;;:~.~~~~;~;.;;~..~~~~~~;~"~8 ~ Royal Hills Drive Cat:R Zone:1 Family:OEFAULT Age (Yro):10.4 I 1 PCI REPORT I Site Name : City of Arden Hills lIIIi"se Name : C:ARDHLLS Report Date: AUG/19/1996 .1 Netwrk Branch Sect i on Last last 10 Number Construct Inspection PCI Name Num/Rank/Surf/Length(LF)/Area(SF) Date Date Use 1 ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~- 1 520-1 06 1 I E I AC I 795.001 33970.00 JUL/01/1985 NOV/DB/1995 79 Arden Vista Court Cat:R Zone:l Family:OEFAULT Age (Yrs):10,4 ROADWAY From: Royal Hills Drive To: cul-de-sac 1 -------.---..-------.--.-------.-.----------..---.------.....----.------------ 520-1 18 1 / E I AC / 4511,00/207506.00 JUL/3111986 NOV/DB/l995 80 Hamline Avenue Cat:R Zone:l Family:DEFAULT Age (Yrs): 9.3 ~ ..__..~~~~_..._~~~:_~~~-~~~~~~-~~~~_..._----~~:.~:~:_~~-------_._.._--_. 520-1 20 1 I E / AC I 570.001 22680.00 JUL101I1991 NOV/08/1995 83 Indian Dales Court Cat:R Zone:l Family:DEFAULT Age (Yrs): 4.4 ~ ;;~~;-;:~~~-;- -~:;~:~~~ -~~:~~~--~;;~:~~-~~~~;~;~:;~~;~~~~;~;;;;..~ ~ ._.__.;~~~~~~._~~~:_~~:~-~:;~~-~~~~:__._:~~~~~;~~~~:~~~~~~~;~~~:~:~ _ 37 1 / E I MC / 234,001 10296.00 JUL/01l1993 NOV/08/1995 83 I. IIyncrest Circle Cat:R Zone:l Family:OEFAULT Age (Yrs): 2.4 ROADWAY From: Haml ine Avenue To: 234' East of Hamline -----..--------------------------...------------------------------------------ ~520.1 03 1 / E I MC / 1297.001 29831.00 JUL/01l1993 NOV/08/1995 84 Antlle Road Cat:R Zone:l Family:DEFAULT Age (Yrs): 2.4 ROADWAY From: Hamline Avenue To: Deed End 1 .--....-----.-..-...-----......--------..--,..-----------......-------------.. 520-1 37 2 / E / MC I 1111.001 4S628.00 JUL/01/1993 NOV/08/1995 84 IIyncrest Circle Cat:R Zone:l Femily:OEFAULT Age (Yrs): 2.4 I------~~~~._---~:~:.~~:_:~~~-~~-~~~~~~-_.._-~~:_~~~~~~~~~-.----.--,---- 520-1 05 2 I E / MC / 180.001 3960.00 JUL/01/1993 NOV/l0/1995 85 Arden View Drive Cat:R Zone:l Family:DEFAULT Age (Yrs): 2.4 I------~~~~~._---~~~:.~~~~~.~:~~~~-------_.._-~~:.~:~~~-~~~:.~~~~~-~~~~-- S20-1 13 1 I E I MC / 446.001 15164,00 JUL/01/1993 NOV/08/199S 85 I Dellwood Street Cat:R Zone:l Family:DEFAULT Age (Yrs): 2.4 ---_..~~~~----_:~~:.~~~-~~~---,--"'_.__.,'~~:_~~:~~::-~~~:_~~~:~--_._- ~520-1 39 1 / e / MC / 1270.001 51034.00 JUL/01/1993 NOV/08/199S 8S Wynrldge Drive Cat:R Zone:l Family:DEFAULT Age (Yrs): Z.4 ROADWAY From: Wynridge CircLe To: Cul-de.sec ------------------------------------------------------------------------------ 1520.1 19 1 I E I AC I 170.001 13640.00 JUL/01/1989 NOV/07/1995 86 ~ndien Oaks CircLe Cet:R Zone:l Family:DEFAULT Age (Yrs): 6,4 OAOWAY From: Hamline Avenue To: cul-de-sac ~-----_..__.._._---_.._-------_._--_._----------------------------.---.-.-.---- 1 I PCI REPORT I Site Name : City of Aeden Hills ~base Name : C:ARDHLLS Repoet Date: AUG/19/1996 I Netwek Beanch Sect i on Last Last 10 NUllbee Construct Inspection PCI Name Num/Rank/Suef/Length(LF)/Ae.a(SF) Date Dste Use I .................................'............................................. 520.1 17 1 I E I AAC I 3D8.DDI 16792.DD JUL/01/1993 NOV/D8/1995 87 Gale Ciecle Cat:R Zone:l F..ily:OEFAULT Age (Yes): 2.4 I ;;~:;.~~~~~.;..~~~~~~~~~.:~~;;~:~~;~~;~~~:~~.:~~~~;~;;;;~~~~;~~~;~"~7 I Nuesecy Hill Lane Cat:R Zon.:' Family:OEFAULY Age (Yes): 2.4 ......~~~~~.....:~~~.~~~~~.~~~~~......._....:~~.~~:.~~~_.............. S20.1 40 1 I E I AC I 1875.001 67500.DO JUL/01/1991 AUG/0811996 87 I Snell ing Avenue Noeth Cat:R Zon.:l Family:DEFAULT Age (YI'S): 5,1 ROADWAY Feom: TN 96 To: Royal Hills Deive -------------.---------------------------------------------------------------- I 52D.l 40 2 / E I AC I 510.001 21420.0D JUL/01/1991 AUG/08/1996 87 Snelling Avenue Noeth Cat:R Zone:l Family:DEFAULT Age (Yes): 5.1 ROADWAY Fe...: Royal Hills Deive To: McClung Ddve ~ .........................................................,.................... S2D,' 04 , I E I AAC I 1245.001 36105.0D JUL/DII1993 NOV/l0/199S 88 Anden VIew Couet Cat:R Zone:l Family:DEFAULT Age (Yes): 2.4 ~ ;~.;~~~~.;..;~~~~~~~.~~~;:~~;~.~;;~:~~.:~~~;~;;;~~~~~~;;;;;;..~ Kaeth Lake Ciecle Cat:R Zon.:' Family:DEFAULT Age (Yes): 2.4 ~ ;~:;.:~~~~.~..~~~~~~~~;:~~.;~~..;~;:~:~~.:~~~;~;;;;;;~~~~~~~;~"~9 ~ Snelling Avenue Noeth Cat:R Zone:l. F8IIily:DEFAULT Age (Yes): 5.' ......~~~~~._...:~~~.~~:~~.~~~~.,...........:~~.~~~~~~~~~.~~~~~........ 520.1 D5 1 I E I AAC I 230.001 506D.00 JULIOII1993 NOV/l0/1995 90 I Acden View Oeive Cat:R Zon.:l Family:OEFAULT Age (Yrs): 2.4 ROADWAY From: Haml ine Avenue To: Arden View, north lane ------------------------------------------------------------------------------ ~ 520'1 07 , LEI AACJ 255.001 15030.DO JUL/0111993 NOV/08I1995 90 Briarknoll Circle Cat:R Zone:l Family:DEFAULT Age (Yrs): 2,4 ROADWAY From: Briarknoll Drive To: CUL-de-sac I ..........-...............................,................................... 520,' 30 1 I E I AAC I 120,001 la39O.00 JUL/O'I'993 NOV/08/'995 90 Nonna Circle Cat:R Zone:' Family:OEFAULT Age (Yrs): 2.4 I;;~:;.~~~~.;..~:~~~~~~.~~~~;~:~~;~~;;~;~:~~.:~~~~~;~;;;;~~~~~~~~;;;;";O Ilynceest Lane Cat:R Zone:l Family:OEFAULT Age (Yrs): 2,4 I;~~~~~~.;..~:~~~~~~~~~~;~:~~..;~~;:~~.:~~~~;;~;.~~~~~~;;;;;..~ ~ Nurseey Hill Couet Cat:R Zone:l Family:OEFAULT Age (Yrs): 2.4 I I PCI REPORT 1Il Site Name : City of Arden Nills _base Name : C:AAONLLS Report Date: AUG/19/1996 Netwrk Branch Section Last Last I [0 NU11ber Construct [nspection PCI Name Num/Rank/Surf/length(lF)/Area(SF) Date Date Use 1Il -----..---.----------------...---------.----------------------------------------- ROADIlAY From: Nurse~ Hill Lane To: Cul-de-sac -------------------------------------------------------------------------..--- I 520'1 32 1 I E I MC I 393.001 21222.00 JUl/01/1993 NOV/OS/1995 92 Nursery Hill Lane Cat:R Zone:! Family:OEFAUlT Age (Yrs): 2.4 ROADIlAY From: Nursery Hi II Court To: 393' north I ;;~:;.~;......;..~.~.~.~~.~...;~~;:~~~..;~~;:~~..~~~~;~;;;;..~~~~;~~;;;;..~4 Arden View Drive Cat:R Zone:l Family:OEFAUlT Age (Yrs): 2.4 ROADIlAY From: 921' East of Royal Hills To: Hamline entrance III .....................-.........................................-.............. 520-1 OS 1 I E I MC I 1420.001 48280.00 JUl/01/1993 NOV/OS/1995 94 Briarknoll Drive Cat:R Zone:l Family:OEFAUlT Age (Yrs): 2.4 III ;;~:;.?~~~.;..~ ~~~~~~;~~~ ~=..;;;;~:~~.~~~~~:~~~:~~;~;;;;..~ I James Circle Cat:R Zone:l Family:OEFAUlT Age (Yrs): 2.4 ------~~~~-----~:~~-~~~-~~~:~~-~:~~---------~~~-~~~:~:~:~-------------- . 29 2 I E I Me I 315.001 10710.00 JUl/01/1993 NOV/08/1995 95 I Norma Avenue Cat:R Zone:l F8IIily:OEFAUlT Age (Yrs): 2,4 ROADIlAY From: Dawn Circle To: Briarknoll Drive ------------------------------------------------------------------------------ 1520'1 26 1 I E I AC I BOO.OOI 2nOO.00 JUL/01/1994 NOV/10/1995 97 Keithson Orive Cat:R Zone:l Family:OEFAUlT Age (Yrs): 1.4 ROADWAY From: T .H. 96 To: Dead end 1 ......-.................................................................,..... 520.1 02 1 I E I AC I 1993.001 63776.00 JUl/01/1994 NOV/07/1995 99 Amble Drive Cat:R Zone:l Family:OEFAUlT Age (Yrs): 1.4 ~ ......~~~~.....~~~~.~~~~~.:~~~.~~~...........~~~.:~:~~~~~~.~~~........ S20-1 27 1 I E I AC I 350.001 20000.00 JUl/01/1995 NOV/OS/1995 99 McClung Circle Cat:R Zone:l Family:OEFAUlT Age (Yrs): .4 I;;~:;.~~~.;..~~~~~~~~:;~.~~:~~~..;;;~~:~~.~~~~;~;;;;~~~~~~;~~;;;;";6 I.,.... ~~~~~~. ~~:~~ - ~: ~:. ~~. ~~~ ~~. ~=~ ~.... :~~~ ~~~;:~~~:.. ~~~. :~~~~ ~~:: ~ 520.2 05 2 / 0 I AC / 905.001 32580.00 JAN/01/1980 NOV/10/1995 30 .1 West Round Lake Road Cat:O Zone:2 Family:OEFAUlT Age (Yrs):15,9 ROADWAY From: 14th Street NE To: 13th Street ME --..-----.--------.----------------------------------------------------------- 1520'2 06 1 I 0 I AC I 400,001 26080.00 JAIl/01/1980 NOV/l0/1995 40 ~ 13th Street NE Cat:D Zone:2 Family:OEFAUlT Age (Yrs):15.9 ROADWAY From: West Round Lake Road To: Cul-de-sac 1 ................................................................,............. 1 -- I PCI REPORT I Site Name : City of Arden Hills ~base Name : C:ARDHLLS Report Date: AUG/19/1996 etwrk Branch Section last Last I 10 N"""r Construct Inspection PCI Name NUOVRank/Surf/Length(LF)/Area(SF) Date Date Use I ------------------------------------------------.-.---------------------------- 52D-2 D4 1 I E I AC I 28D.001 17380,00 JUL/01/1987 NOV/l0/1995 62 Wedgewood Circle Cat:D Zone:2 Famil y:OEFAUL T Age (Yrs): a.4 ~ ;;~:;-~~~~~'~--;~~~~~~~~;~~--;;;:~~;--;;~~~:~~.:~~~~~;;~;~~~~~;~~;~~;'.;2 Parkshore Drive Cat:8 Zone:2 Family:OEFAULT Age (Yrs): a.4 .1 ---.,-~~~~--.--~~~~-~~~.~~---,-..------..,-..-:~~-~~~:~:~~~------.----..- 520-2 Dl 1 I E I AC I 623.001 21182,00 JUL/Ol/1987 NOV/l0/1995 86 I Brueberry Lane Cat:B Zone:2 Family:DEFAULT Age (Yrs): a,4 _._---~~~~-----~~~~-~~~~~~~~~-~~:~._.._-----_:~~-~~~-~~-_.._-----_._----- 1520-2 05 1 I 0 I MC I 2536.001 60864.00 JUL/01l1992 NOV/1D/1995 88 West Round Lake Road Cat:R Zone:2 Family:OEFAULT Age (Yrs): 3.4 ROADWAY From: T.H.96 To: 14th Street NE I ;;~:;-~~-----.;--;-~-;-~~--;---.~;:~~;--~~~;:~~--~~~;~~;~~~--~~;;;~;~~;--;1 Fairvlew Avenue Cat:R Zone:3 Family:OEFAULT Age (Yr8):34.8 ~ ~-~~~~~-~--;~~~~~~~~~~~-~~;--;~~:~~_:~~;~~~~~~~;;;~;~~--~ Falrview Avenue Cat:R Zone:3 Famlly:DEFAULT Age (Yrs):34.a ~ ;;~:;-;~~~~.~_.;~~~~~~~~~:_~~:~~;--~~;~~:~~.:~~~~~;~~~~~~~;~~;--;I I Valentine Court Cat:R Zone:3 Family:OEFAULT Age (Yrs):34.8 ------~~~~-----~~~~-~~~~~~~-~~~~~-------_..~~:_~~~~-~~~~------------- 520-3 14 1 I E I AC I 605,001 Z0570.0D JUL/01/1977 OCT/31/1995 42 I McCracken Lane Cat:o Zone:3 Famil y:OEFAUL T Age (Yrs): 18.3 ROADWAY From: Old Highway 10 To: Chatham Avenue ------------------------------------------------------------------------------ 1520-.3 06 1 I E I MC I 200.001 14654.00 JUL/01l1991 OCT/3111995 63 Chatham Court Cat:R Zone:3 Family:OEFAULT Age (Yrs): 4.3 ROADWAY From: Chatham Avenue To: Cul-de-sac ~ --.-----------.---------.----..-----------.---.----------------------.------.. 520-3 16 1 I E I AC I 2170.001 520aO.00 JAN/01/1970 OCT/31/1995 67 Thom Drive Cat:R Zone:3 Family:OEFAULT Age (Yrs):25.8 ~'-_...~~~~~-_._-~~~~_:~~~~~~-~~~._,----_._:~~.~~~-~~:~~~~~-~~~------- 520-3 03 1 I E I MC I 168.001 13566,00 JUL/01/1977 NOV/01/1995 75 Brighton Way South Cat:R Zone:3 Family:OEFAULT Age (Yrs):la,3 I;~~~~~-~--;~~~~~~~~~~~~;;:~~;-,;;;;;:~~-:~~~~~;;;.;;;~~~;;;~;~;;;'-;6 I Brighton Way Cat:R Zane:3 Family:DEFAULT Age (Yrs):18.3 I I PCI REPORT ~ Site Name : City of Arden Kills 4111fbase Name : C:ARDKLLS Report Date: AUG119/1996 wrk Bianch Section Last last I ID NUI1ber Construct Inspection PCI Name NumVRank/Surf/Length(LF)/Area(SF) Date Date Use I ...-------.--------------------------.---------------.-----.------------------. ROADWAY From: New Brighton Road To: New Brighten Road ------------------------------------------------------------------------------ 1 52D-3 14 2 I E I AC I 375.001 20604.00 JUL/0111977 OCT/31/1995 76 McCracken Lana Cat:D Zone,3 Family:DEFAULT Age (Yrs),18.3 ROADWAY From: Chatham Avenue To, Cul-de-.ac I ;;~~; -;; - -. - -.; - -; - ~ -;. ~~. -; - -.. ;;; :~~; - - ;~;~~: ~~' - ~~~;~;;;;;;..~; ;;; ;;;;;.. ~ Janet Court Cat:R Zone:3 Family:DEFAULT Age (Yrs),16.3 ROADWAY From, County Road F To, Cul.de.sac I ---...--....-----.......----..-..----.....-.....-------..--...---------...-... . 52D-3 19 1 I E I AC I SOD.OOI 31860.00 JUL/01/1991 OCT/31/1995 79 Valentine Crest Road Cat,R Zooe:3 Family,DEFAULT Age (Yr.): 4.3 I ;;~~;.~~~~-;--;~;~~~~~::~~;;:~~~-;~;~:~~-~~~~~~~;;.;;;~~~;;;;;;;;;";0 I Chatham Circle Cat,R Zone:3 Family:DEFAULT Age (Yrs): 4.3 -_..._~~~~~-_._-~~~~_:~~:~~.~~~~~----_._..._-~~~.~:~~~:~~~-----_...__... 'III' 17 1 I E I AC I 1140,001 28500.00 JUL/01/1991 OCT/31/1995 80 ~ Valentine Avenue Cat:R Zone:3 Family:DEFAULT Age (Yr.): 4.3 ROADWAY From: County Road F To: Old Highway 10 ------------------------------------------------------------------------------ ~ 520-3 07 1 I E I AAC I 1052.001 31560.00 JUL/01/1991 OCT/30/1995 81 Crystal Avenue Cat:R Zone:3 Family:OEFAULT Age (Yrs), 4.3 ROADWAY From: Fai rvi ow Avenue To: County Road F ~ ..-.-.------..--...---------.------..----...------...--.-.--------.--..---.... 520.3 08 1 I E I AAC I 490.001 14700,00 JUL/01/1991 OCT/30/199S 83 Dellview Avenue Cat'R Zone:3 Family:OEFAULT Age (Yrs): 4.3 ~ _._._-~~~~~-_...~~~~.:~:~:~:_...,'_.._-----_...~~~.~~~:_~~~~:~-~~~~..._._- 520.3 20 1 I E I AAC I 1605.001 48150.00 JUL/01/1993 OCT/30/199S 83 Venus Avenue Cat:R Zone:3 Family,DEFAULT Age (Yr.): 2,3 I;;~:;-~~~~~-;..;~;:;~~~:~:~~-;;~:~~~~;;;;~:~~-~;~~;:;~;~;;-~~~;:;;;;;;'-;6 lII--..--;~;;~~-~~~~~;;;:~~:~~:~:~~:-::~:::,..,:~~;~~~~~~~;~~~::_:~:::::~:: 1520-3 04 2 I E I AAC I 1070.00/ 36380.00 JUL/01/1991 OCT13111995 86 Chatham Avenue Cat,R Zone:3 Family,DEFAULT Age (Yrs): 4.3 ROADWAY From: Chatham Court To: Chatham Circle -----------------------------------.------------------------------------------ lII520-3 04 3 I E I AAC I 5S0.001 18700.00 JUL/01/1991 OCT/31/199S 87 Chatham Avenue Cat,R Zone,3 Family:DEFAULT Age (Yr.): 4.3 II-~:----_:~'-~~-"~:~------------'~:_~-'~---------- I I PCI REPORT I Site N.... : City of Arden Hills 4111rbose Name : C:ARDHLLS Report Date: AUG/19/1996 I Netwrk Branch Section Last Last ID NU11ber Construct Inspection PCI Name Num/Rank/Surf/Length(LF)/Area(SF) Date Date I Use ------------------.--------------------------------------------.----------.---- 52D-3 D4 1 IE/MCI 2230.DOI 7582D.00 JUL/Dl/1991 OCT/3111995 88 Chatham Avenue Cat:R Zone:3 FOllIn y:DEFAUL T Age (Yrs): 4,3 I ROADIIAY From: County Road E2 To: Chatham Court --------------------------------------------------.--------------------------- 520-3 D4 4 IE/MCI 84S .001 36584.0D JUL/01l1991 DCT13111995 89 I Chatham Averoe Cat:R Zone:3 Family:DEFAULT Age (Yrs): 4.3 ROADIIAY From: McCracken Lane To: Cul.de-sac ------------------------------------_________________________w________________ I S2D-3 11 1 IE/MCI 625.0DI 25108.00 JUL/DI/1993 OCT/3111995 90 Glenview Court Cat:R Zone:3 Fornil y:DEFAUL T Age (Yrs): 2.3 ROADIIA Y From: Glenview Avenue To: Cul.de-sac --------------------------------------------------.-.------------------------- 1 520-3 12 1 IE/MCI 146O.0DI 43800.00 JUL/01l1993 DCT/3D/I995 9D Gramsie Road Cat:R Zone:3 Fami ly:DEFAULT Age (Yrs): 2.3 ROADIlAY From: Rolling Hills Road To: Dellv;ew Avenue I .----.------------.------------.----.---.------------,--....---.-------------- 52D-3 08 2 I E I MC I 715.001 21450.DO JUL/DI/1993 DCT/30/1995 92 Dellv;ew Avenue Cat:R Zone:3 Family:DEFAULT Age (Yrs): 2.3 111 ~;-~~~-;..~~~~~~~~;-~~~;:~~;~;~~:~-~~~~;~~~~;~;;~;~;--;3 Glenv;ew Avenue Cat:R Zone:3 Family:OEFAULT Age (Yrs): 2.3 ~ _.__._~~~~---_.~~~~.~~~~~~~-~~~......_"'-~~~_:~~-~~-~---.....--. 520-3 15 1 I E I MC I 370.001 11100,00 JUL/01/1993 OCT/30/1995 93 ~ ------~~~_::::~~;;~~~~~-~~;~:_:::::~--_.:~~~~~~~~:~~;;:.::~:::_::~ 1 52D-3 D9 3 I E I AC I 530.001 159DO.00 JUL/01l1993 DCT131/1995 99 Fairv;ew Avenue Cat:R Zone:3 Famlly:DEFAULT Aga (Yrs): 2.3 ROAOIlAY From: Gramsi. Road To: v.....s Avenue ------------------------------------------------------------------------------ 1520-3 21 1 I E I AC I 975.001 31200,00 JUL/15/1996 JUL/15/1996 100 County Road F Cat:R Zone:3 Fam;ly:DEFAULT Age (Yrs): .0 ROADIlAY From: 1-3511 bridge To: 975' East of bridge ~ ---.-----------...---.----------.------...--------------....--.---------...-.- 520-3 21 2 I E I AC I 1600,001 70400.DO JUL/15/1996 JUL/15/1996 100 County Road F Cat:R Zone:3 Fornily:DEFAULT Age (Yrs): .0 1 ;;~:;-~~~.;--~~~~~~~;.~~;;;;:~~~::~~:~~-~~~~;;~;~~~~~~~;;;;~~-;~O County Road F Cat:R Zone:3 Fam;ly:DEFAULT Age (Yrs): ,0 1 4111i-;~~-;--~~~~~~~:~:-~;;;~:~~~::;~~:~~-~~~~~~;~;~--~~~;~;~;--;9 ~ Stowe Avenue Cat:R Zone:4 Family:DEFAULT Age (Yrs):35.8 ~ I PCI REPORT I Site Name : City of Arden Hills 4111Jbase Name : C:ARDHLLS Report Date: AUG/19/1996 I Netwrlc Branch Section Last Last ID Numer Construct Inspection PCI Name NUI1/Rank/Surf/Length(LFl/Area(SFl Date Date Use I ......~~~~~.....;~~;.~;~~;:~.................;:;.~::.;~;~~~:~.~::~........ ..........--..........-------------------------------------------------------- I 520.4 29 lIE 1 AC 1 4DO.001 8400.00 JAN/01l1970 NOV/07/1995 23 Pascal Avenue Cat:A 20ne:4 Family:OEFAULT Age (Yrsl:25.8 ROADWAY From: County Road E To: Turn Around I '............................-.......................,........................ S20.4 01 lIE 1 AC 1 420.001 5880.00 JAN/01/1961 NOV/06/1995 24 Alley (Lk Jon Blvd'Fair) cat:R Zone:4 Family:OEFAULT Age (Yrsl:34.8 I ......~~~~._...~~~~.~~~~.~~~~~.~~~:........~~~.~~~~:~~.~:~~~~......... 520-4 04 lIE 1 AC 1 1425.001 34200,00 JAN/01/1962 NOV/06/1995 34 Arden Place cat:R Zone:4 Family:OEFAULT Age (Yrsl:33.8 I ;;~~~.;~~~.~..;~~~~~~~~.:~~;:~~;..~~~:~~.~~~~;~;~;;;~.~;~;~;~~;";5 1 ......~~~~.~~~~~;~;:;~~~~;;;~~.~~~~~~...,::~~;~~;;;~~..~~~.:~~::~~:~ . 31 lIE 1 AC 1 831.001 12465.00 JAN/01l1970 NOV/02/1995 36 1 Ridgewoad Court Cat:R Zone:4 Family:DEFAUlT Age (Yrsl:25.8 ROADIlAY From: Ridgewood Road To: Turn'around -----------------------------------------------------------------------------. 1520,4 27 lIE 1 AC 1 1758.001 4S708.00 JAN/01l1970 NOV/06/199S 41 Oak Avenue Cat:A Zone:4 Family:OEFAULT Age (Yrsl:25.8 ROADIlAY From: Lake Johanna Blvd To: Turn'around I .................................,...............,............................ 520.4 40 1 1 E 1 AC 1 890.001 20470.00 JAN/01/1970 NOV/l0/1995 47 Hemline Avenue (service) Cat:R Zone:4 Family:DEFAULT Age (Yrsl:25,9 I ......~~~~~.....~~~~.:~~~~.~~~.:..........,..~~~.~~~~.~,............... 520.4 12 lIE 1 AC 1 380.001 11020.00 JAN/01/1961 NOV/01/1995 50 Fairview Avenue Cat:R Zone:4 Family:DEFAULT Age (Yrsl:34.8 I ......~~~~.....~~~~.~~~~~-~~.............".~~~.~~~~~.~~~.............. 520.4 18 lIE 1 AC 1 1180.001 34220,00 JAN/01/1961 NOV/01/1995 50 1 Grant Road Cat:R Zone:4 Family:OEFAULT Age (Yrs):34.8 ------~~~~-----~~~~-~~-~~~~~~~~-~~~~--------_:~:_~:~~:~-~~~~--------- 1520.4 05 lIE 1 AC 1 S5,001 9510.00 JUL/01/1977 NOV/02l199S 53 Indian Place Cat:R Zone:4 Family:DEFAULT Age (Yrsl:18.3 ROADWAY From: County Road E To: Cul-de-sac .-.-------------------------------.-.-.--------------------------------.------ IS20'4 11 lIE / AC 1 1167.001 36177,00 JAN/01l1961 NOV/0211995 S7 eEd9ewater Avenue Cat:R Zone:4 Family:DEFAULT Age <Yrsl:34.8 ROADWAY From: New Brighton Road To: 1167 feet west ~ ............................................"................................ I I PCI REPO~T I Site Name : City of Arden Nill. _.e Name : C:ARDHLLS Report Date: AUG/19/1996 I Netwrk Branch Section Last Laot 10 Nunber Construct Inspect i on PCI Name Num/Rank/Surf/Length(LF)/Area(SF) Date Date Uoe III ---..-.---------.----.--------.---.---'------.---..------------.-----..-------- S2D-4 19 lIE 1 AC 1 660,001 11880.00 JAN/01/1960 NOV/01/1995 57 Hudson ~oad Cat:R 2one:4 Family:OEFAULT Age (Yrs):35.8 I ;;~:~-;~~~.;.-;~~~~~~~;~:~;;;~~~~~~;~~:~~-:;~;~~~~~~;~;;;~;'-~2 I Lake Lane Cat:R 20ne:4 Family:OEFAULT Age (Yrs):33.8 --_...~~~~-----~:~~.:~~~-~~~~~.~~~-,--_..__:~~.~~~_:~----.-....-..... 520-4 11 2 1 E 1 AC 1 575.001 27410.00 JUL/01/1977 NOV/02/1995 69 I Edgewater Avenue Cat:R 2one:4 Family:OEFAULT Age (Yrl):18.3 ROADWAY From: 1167' west of New Br.Rd. To: Cul'de-sac ------------------------------------------------------------------------------ I 520-4 14 liE / MC 1 760.001 19000.00 JAN/01/1961 NOV/06/1995 72 Glenarden Court Cat:R 2one:4 Family:OEFAULT Age (Yrs):34.8 ROAOIlAY From: Snell ing Avenue To: Skiles Lane I .-.-..-.----------.--..------..---...,-------------..--...------------....---- 520,4 10 1 1 E 1 AC 1 890.001 21360.00 JAN/Oll1980 NOV/06/1995 73 Edgewater Avenue Cat:R 2one:4 Family:OEFAULT Age (Yro):15.8 I ;!-;?~~.; ..;~~~~ ~~::.;~::~;..~;;;~:~~.:;~~~~;~:~.~:~;;~; --~ Glenhlll Road Cat:R Zone:4 Family:DEFAutT Age (Yrl): 6,3 ~;;~:~.;~~~-;--;~~~~~~~::_;;~;:~;._;;~~;:~~_:;~~;~;;~";.~~~;;;~;--~ I Glenpaul Avenue Cat:R 20ne:4 Family:DEFAULT Age (Yrs):34.8 ._.._-~~~~-----~:~~-~~~~~~~-~:~-----_.._.:~~-~~.~:~~~~~~-~~_..._.- 1520-4 33 lIE 1 AC 1 1230.001 ZS830.oo JAN/0111961 NOV/02/1995 73 Sandeen Road Cat:R 2one:4 Family:DEFAULT Aga (Yro):34.8 ROAOIlAY From: Lake Johanna Blvd To: Lake Johanna Blvd ------------------------------------------------------------------------------ 1520'4 03. lIE 1 AC 1 2353.001 80002,00 JUL/01/1982 NOV/07/1995 76 Ardan Oako Drive Cat:R Zone:4 Family:DEFAUlT Age (Yrl):13.4 ROAOIlAY From: Snell ing Avenue To: County Road E ,--.--'----...--.-.------.---..-----'--.....-.-.--------------...----.--.----.- 520-4 39 lIE 1 AC 1 1180.001 36580.00 JAN/01/1980 NOV/06/1995 76 Ridgewood Road Cat:R Zone:4 Family:DEFAULT Age (Yro):15.8 I;;~:~-~~~-;--;~~~~~~~~~-~~;~:~~;~~;;;;~:~~_:;~~~;.;;~._~~;~;;;~;--~ Arden Oaks Court Cat:R Zone:4 Family:DEFAULT Age (Yro):13.4 I;~?~~~-;--;~~~~~~~-~~~~~:~~.;;;;~:~~_:;~~~;;~~~~~;~~;;~;--~ ~ Skileo lane Cat:R Zone:4 Family:DEFAULT ABe (Yrs): 5,3 I I PCI REPORT I Site Name : City of Arden Hills ~abase Name : C:ARDHLLS Report Date: AUG/19/1996 . etwrk Branch Section Last last I ID Nunber Construct Inspection PCI Name Num/Rank/Surf/Length(LF)/Area(SF) Date Date Use I 4~..______________________________________________________w_.____________._____ ROADIlAY From: Arden Place To: Snell fng Avenue ------------------------------------------------------------------------------ I 52D-4 13 1 IE/MCI lD7D.001 321DD.DO JAN/D1/1961 NOV 106/1995 79 Forest lane Cat:R Zone:4 Farnil y:DEFAUL T Age (Yrs):34,8 ROADIlAY From: Snell fng Avenue To: Glenarden Road ------------------------------------------------------------------------------ I 52D-4 28 1 I E I AC I 1250.001 37500, DO JAN/D1/1961 NOV/Dl/1995 83 Noble Road Cat:R Zone:4 FamH y:DEFAUL T Age (Yrs):34,8 ROADIlAY From: New Brighton Road To: Fail"View Avenue I ------------------------------------.----------------------------------------- S20-4 32 1 IE/MCI 1378.001 31694.00 JULI31/1990 NOV/06/1995 83 Ridgewood Road Cat:R Zone:4 Famll y:OEFAUL T Age (Yrs): 5.3 .1 ROADIIA Y From: Lake Johanna Blvd To: Arden Place ----------------------------------....-------..-.--------..-...-------.-...... 52D-4 35 1 IE/AC I 1596.001 44664,00 JAN/D1/1962 NOV/02/1995 83 Siems Court Cat:R Zone:4 Family:DEFAULT Age (Yrs):33.B ~ ------~~~~-----~:~~-~~~~_:~~~~~-~~:~---------~~~.~~~:~:~~~._-----_._---- . 25 1 I E I AC I 180,DDI 13980.DD JUL/31/1984 NOV/03/1995 85 I Lamett! Circle Cat:R Zone:4 Family:DEFAULT Age (Yrs):11.3 ROADIlAY From: L....tti Lane To: CUL-de-sac ........---------------.-.------.--.--------...--.----------.---------------.. 1520-4 36 2 I E I AC I 1115.001 26760.00 JUL/3111991 NOV/06/1995 87 Skiles lane Cat:R Zone:4 Famil y:DEFAUL T Age (Yrs): 4.3 ROADWAY From: Snell ;ng Avenue To: Dead end ----------..-----.--.-----.---..---.-.--..-.------.--.----------.-.----------- 1520-4 26 1 I E I AC I 695.DOI 3149O,DD JUL/31/1984 NOV/03/1995 89 Lametti Lane Cat:R Zone:4 Famil y:DEFAUL T Age (Yrs):11.3 ROADIlAY From: Snelling Avenue To: Cul-de-sac III -.-------------------------...------------------------.----------------------- 520-4 D4 2 I E I AC I 1236.DDI 37080.DD JUL13111991 NOV/03/1995 90 Arden Place Cat:R Zone:4 Family:DEFAULT Age (YrS): 4.3 III ;;~:~-~~~~-;--;~~~~~~~;~:~~;;~~~.-;~;~:~-~~~~;;;;;~~-~~~~;;~--~ ClIlIIllngs Lane Cat:R Zone:4 Family:DEFAULT Age (Yrs): 6,3 III ------~~~~-----~:~~-~~~~:~~,~~----__,___.~~~_~~~~.~~_____________.__ 520,4 15 1 I E I AC I 2037.001 61110.00 JUL/31/1991 NOV/06/1995 93 I Glenarden Road Cat:R Zone:4 Farnil y:DEFAUL T Age (Yrs): 4.3 ROADIIAY From: Glenarden Court To: Arden Place ----...----------------------------..--------------------------.-------------- 1520-4 22 1 I E I AC I 1150.DDI 391DD.DD JULI31/1983 NOV/02/1995 95 . Kate lane Cat:R Zone:4 Famlly:DEFAULT Age (Yrs):12.3 ROADIIAY From: Cleveland Avenue To: Dead End III -------.----------.----------------------------.----------------.------------- III I PCI REPORT I Site Name : City of Arden Hills ~e Name : C:ARDHLLS Report Date: AUG/19/1996 etwrk Branch Section Last Last I 10 NUlbor Construct Inspection PCI Name Num/Rank/Surf/Length(LF)/Area(SF) Date Date Use I -----------------.-------------------------------'.'-------,-.-------------.-- 520-4 08 liE I AC I 660.001 19800.00 JUL/D1/1994 NOV/03/1995 99 Bussard Court Cat:R Zone:4 Family:DEFAULT Age (Yrs): 1.3 I ;;~:~-;~~:-;--;~~~~~~~~;~~~-~;:~~;-"~~~:~~,~~~~;;;~~~~;~;;;;;;--~ Jamie Circle Cat:R Zone:4 Family:OEFAULT Age (Yrs):12,3 I .-.---~~~~:-.---~:~~-~~~~-~~~---,-....-,.----,~~~-~~~:~:~~.--....------- S20-4 23 1 I E I AC 1 380.001 19280.00 JUL/01/1994 NOVI01/1995 99 1 Katie Court Cat:R Zone:4 Famlly:OEFAULT Age (Yrs): 1.3 ROADWAY From: Kate Lane To: Cul-de'sae ---------------------.------------.-..---------------------------------------- 1 520-4 06 1 I E I AAC I 950.001 26600.00 SEP/15/1995 SEP/15/1995 100 Asbury Avenue Cat:R Zone:4 Famlly:OEFAULT Age (Yrs), .0 ROADIIAY From: South city limits To: Edgewater Avenue -----------------------------------------------------------------------------. 1520-4 07 1 I E I AAC I 890.001 26700.00 SEP115/1995 SEP/1511995 100 Beckman Avenue Cat:R Zone:4 Famlly:DEFAULT Age (Yrs): .0 tII ~-;~~~:-;--;~~~~~~;~:~;~;~:~~;~~;~;~~:~.~;~;;;;;;~;~~;;;;;;;;;-;~O Jerrold Avel'lJe Cat:R Zone:4 Famlly:DEFAULT Age (Yrs), ,0 I ;;~:~. ;;~:.; -.; ~~~~ ~~; ~:~ ~~~~: ~~;:~ ;;;~ :~~- ~;~; ;~;;;;;:~~ ~~; ;;;;;;;;. ;~O Jerrold Avenue Cat:R Zone:4 Family:DEFAULT Age (Yrs): .0 I.---.-~~~~:_----~:~~-~~:~:_~~~~-~:_~:~-~::_~~--~~~.~~~:~~:~:~_.__._....____ 520-4 30 1 IE/AACI 1300.001 37700.00 SEP/lS/1995 SEP/15/1995 100 tII Prior Avenue Cat:R Zone:4 Famll y:DEFAUL T Age (Yrs): .0 ROADIIAY From: County Road D To: Oead end north -----------------------------------------...------....-------.-------.------.. ~520-4 34 liE I AAC I 1872.001 48672.00 SEP/15/1995 SEP/15/1995 100 Shorewood Orive Cat:A Zone:4 Family:DEFAULT Age (Yrs): .0 ROADI/AY From: Lake Johanna Blvd To: Cul-de-sac I;;~:~.;;-----.;.-;-~-;-~~..;---;;;;:~~;--~;~~:~~--~~;;;~;;;;;.-~;;;~;;;;;-;~O Stowe Avenue Cat,R Zone:4 Family:DEFAULT Age (Yrs): .0 ROADIIAY From: New Brighton Road To: Lake Johanna Blvd 1----...-..-----.-.------.--.----.---.--------..--.-.-----...---.----------.." 520-5 01 1 I E I AC I 210.001 3780.00 JAN/01/1961 NOV/06/1995 17 Alley north of Edgewater Cat:R Zone:S Famlly:DEFAULT Age (Yrs):34.8 1Il...---~~~~~:----.~~~~,~~~-=~~~::~~,~~~-----~~~,~~~-~..--.-.--------. S~O 1 I E I AC I lS0.001 4320.00 JAN/01/1961 NOV/06/1995 25 I Lake Lane Cat:R Zone:5 Family:DEFAULT Age (Yrs) :34.8 tII ~ -..- I PCI REPORT I Site Name : City of Arden Hills ~base Name : C:ARDHLLS Report Dete: AUG119/1996 Netw..k Branch Sect i on last Last I 10 NUI1ber Construct Inspection PCI Name Num/Rank/Surf/Length(LFI/Area(SFI Date Date Use I ---.--------------------------------------------------------------------------- ROADIIAY From: West Edgewater Avenue To: dead end --------------------------------------------------.--------------------------- I 520-5 06 1 I E I AC I 300.001 8400.00 JAN/01/1961 NOV/06/1995 26 lIest County Road D Cat:R Zone:5 Family:DEFAULT Age (Yrsl:34.8 ROADWAY from: Lexington Avenue To: Shoret ine Lane ------------------.----------------------------------------------------------- 1520-503 l/E/AC I 385.001 9625.00 JAN/01l1961 NOV/03/1995 35 CamQn Avenue Cat:R Zone:5 Fami ly:OEFAULT Age (Yrsl:34,8 ROADIlAY From: Tiller Lane To: north ~ .-.............-............-...............................-.........-......- 520.5 17 1 I E I AC I 53S.DOI 11770.00 JAN/01/1970 NOV/06/1995 3S Hamline Avenue Cat:R Zone:5 Family:DEFAULT Age (Y....I:25.8 tIl ~~~~.;~~.;..;~;~~~~~~~~~~~;;~:~~;-.;~~:~~.~~~~;~~;;;;~~~~~~;~;;;~-.~ Hunters Court Cat:R Zone:5 Family:OEFAULT Age (Yrsl:21.3 ~ ......~~~~.....~~~~.~~~~~.~~~................:~~.~~~:~~~~~.............. . 24 2 I E I AC I 500.001 15000.00 JAN/01l1961 NOV/06/1995 45 I Shore I ine Lane Cat:R Zone:5 Family:OEFAULT Age (Yrsl :34.8 ROADIlAY From: lIest County Reed D To: Deed end ------------------------------------------------------------------------------ ~ 520.5 03 2 I E I AC I 46O.DDI 13800.00 JAN/01/1961 NOV/03/1995 48 Cannon Avenue Cat:R Zone:5 Family:DEFAULT Age (YrSI :34,8 ROADWAY Fran: Dunlap Street To: west ----------------------------------------.------------------------------------- ~ 520.5 14 2 I E I AC I 575 ,001 16100.00 JAN/D1/1970 NOV/06/1995 48 Frontage Road Cat:R Zone:5 Family:OEFAULT Age (Yrsl:25,8 ROADIlAY From: Grey Fox Reed To: S75' north lit ......................,....-......,..,.,...................................... 520'5 24 1 I E I AC I 205.001 4100.00 JAN/01/1961 NOV/06/1995 S9 Shorel ine Lane Cat:R Zone:S Family:OEFAULT Age (Y....I:34.8 ~ ._....~~~~~.....~:~~.~~~~.~~~~~~~~~.~~~...._:~~.~~~.~................ 520-5 26 1 I E I AC I l1S.0DI 11655,00 JUL/31/1974 NOV/03/1995 64 lIaldon Place Cat:R Zone:5 Family:DEFAULT Age (Yrsl:21.3 1It......~~~~.....~~~~-~~~~~.~~............_...:~~.:~~:~~~~~~.............. 520.5 16 1 I E I AC I 4S2.00/ 10848.00 JAN/D1/1961 NOV/D3/1995 69 I I ngerson Court Cat:R Zone:S Family:DEFAULT Age (Yrsl:34,8 ROADIlAY From: Ingerson Road To: deed end ------------------------------------------------------------------------------ tIl520.5 23 1 I E I AC I 2468.001 108592,00 JAN/Ol/1970 NOV/06/1995 n . Red Fox Road Cat:R Zone:5 Family:OEFAULT Age (Yrsl:25.8 ROADWAY From: Haml fne Frontage Rd To: Lexington Avenue ~ .'...........-.'...,.-.-....-......-........-............,.---.............--. tIl I PCI REPORT I Site Name : City of Arden Hills ~base Name : C:ARDHLLS Report Date: AUG/19/1996 Netwrk Branch Section Last Last I ID NlII1ber Construct Inspect i on PCI Name Num/Rank/Surf/Length(LF)/Area(SF) Date Date Use tit ------------------------------.--.----------.---.-----------,-..---..--.------- 520-5 04 lIE 1 MC 1 1535.DDI 46050.00 JUL/01/1990 NOV/03/1995 15 Carlton Drive Cat:R Zone:5 Family:DEFAULT Age (Yrs): 5.3 I ;;~:;-;~~~-;--~~;~~~~~;~~-;;;;:~~~..;;;~;:~~,:~~~;;;;;;;;~~~~~~~;~;--~ Grey Fox Road Cat:R Zone:S Family:DEFAULT Age (Yrs):13.3 I ......~~~~-....~~~~.~~~:~~-~~~~~~~-~~..-..:~~.~~~:~~~~~-~~~~------.. 520-5 22 1 1 E 1 AC 1 1103.001 48532.00 JUL/01l1993 NOV/03/1995 15 I Pine Tree Drive Cat:R Zone:S Famil y:DEFAULT Age (Yrs): 2.3 ROADWAY F rOIl: County Road E To: Harriet Avenue ~...-.__.__._----------------------------------------------------------------- IS2O.S 14 1 1 E 1 AC 1 600.001 14400.00 JAH/01l1970 NOV/06/1995 81 Frontage Road Cat:R Zone:5 Family:OEFAULT Age (Yrs):25.8 ROADWAY Fran: 575' north of Grey Fox Rd To: Red Fox Road ------------------------------------------------------------------------------ 1520-5 21 1 1 E 1 AC 1 918,001 36no.00 JUL/3111986 NOV/07/1995 83 Northwoocls Drive Cat:R Zone:S Family:DEFAULT Age (Yrs): 9.3 I !.~~-;--~~;~~~~~ ~~~;;~~~~~..~~~;~:~~-:~~~~~~;:--~~~~~;~;~; --;5 Dunlap Street Cat:R Zone:S Family:DEFAULT Age (Yrs): 3.4 I.--.--~~~~~_....~~~~-~~~-~~.~~~-----_......_:~~.~~-~~~-~~~----..-....- 520-5 10 1 1 E 1 MC 1 870.001 19140.00 JUl/31/1989 NOV/06/1995 88 West Edgewater Avenue Cat:R Zone:5 Family:DEFAULT Age (Yrs): 6.3 I------~~~._...~~~~_:~~~~~~-~~~~...._.._..:~~-~~~-~-,-_........____ 520-5 12 1 1 E 1 AC 1 240.001 9015.00 JUL/01l1989 NOV/03/1995 88 I Femwood Court Cat:R Zone:S Fami ly:DEFAULT Age (Yrs): 6.3 ROADWAY Fran: Ingerson Road To: cul-de-sac ---------------------------------------.--------------------------------.-.... ~520-S 13 1 1 E 1 MC 1 350.001 10S00.00 JUL/01/1989 NOV/03/1995 88 Fernwcod Road Cat:R Zone:S Family:OEFAULT Age (Yrs): 6.3 ROADWAY From: Ingerson Road To: Carlton Drive I;;~:;.~;.-----;-.~.~.~.~~--~-...;~:~~~---~~:~~-.;~~~~;~;~;~..~~~~~;~;~;--~1 Oellwood Avenue Cat:R Zone:S Family:DEFAULT Age (Yrs): 6.3 ROADWAY From: Tiller Lane To: dead end ~...._------_._._-_..._----_.._-_..._--------_...._--'---..._----------------- 20,S 25 1 1 E 1 AC 1 2680.001 80400.00 JUL/01/1992 NOV/D3/1995 98 Tiller Lane Cat:R Zone:5 'amil y:OEFAUL T Age (Yrs): 3.3 1Il;~~~~~~-;--~~;~~~~;~~;;;;:~~.-;;;;;:~~-:~~;;;;~~~.~~~;~;~~;-;~O I Benton \lay Cat:R Zone:S Fam; l y:DEFAUL T Age (Yrs): ,0 I I PCI REPORT Site Name : City of Arden Hills I Database Name : C:ARDHLLS Report Date: AUG/19/1996 . Itrk Branch Section Last Last I 10 NU11ber Construct Inspection PCI Name Num/Rank/Surf/Length(LF)fArea(SF) Date Date Use I ......;~~~.....;~::;.~:~~;:~.~~:..........--;:;.~:~~;:~.~::~........... ....w______..._...________________________________________________.___________ 520.5 05 liE 1 AAC f 950.001 33250.00 SEPflSfl995 NOV/06fl995 100 I Connelly Avenue Cat:R Zone:5 Family:DEFAULT Age (Yrs): .1 ROADWAY FrCll\l: County Road E To: County Road E -------------------------------------------------------------.-----.-.-------- I 520.5 08 liE 1 AC 1 1180,001 37760.00 JULfOI/1994 NOVf03/1995 100 Dunlap Street COt:R Zone:5 Family:OEFAULT Age (Yrs): 1.3 ROADWAY FrCll\l: Ingerson Road To: Oead end III .............-...........--.................................................-- 520.5 18 liE 1 AAC 1 1336.001 50768.00 SEP/15/1995 SEP/15/1995 100 Harriet Avenue Cat:R Zone:5 Family:DEFAULT Age (Yrs): .0 1Il-- -... ~~~.....: ~~~. ~~ ~~. :~~. ~~~~...... --.. .:~~. ~~~~ ~~:. ~:~..... --. I. I I I I I I I I. I I I I. I I I I I APPENDIX B I COST ESTIMATE TABULATION I. I I I I I I I I. I I ------------- --------- I ~ I. ~ ~ 8 88888888888888 8888888888888888888888 g~a ~ ~ ' ~ g .. U ~ ~ U U H ~ ' '~~~~~;~~~~~~~~~~NN~N~~ ~:i~ m ::i <c c( "':i: ~ <( <( oi C"i ,..:~ gl6~MN"': '!f i:t (Ii . i.. I OZZZ zz ~ ~ Z lJlN~ 5 '" - -- ~ 88 ~~~~ ~~l88:g2g88 88!'j8888888 .UU>I>I :: :: a I U' 'C"i~":.o''';''';N(''),.,:p..,;r-.:~g . '~_~~~_..:g~~~~ I NNNc;oS'- ~.iori '" ~_ o"';z. ~_~:;~N!;i!~IN"'_ .. ~~;;~~~h ~ .....'"l~ ~ - - - N N N ~ :;:~ ~~ ~ N N W 8 I w - -- ~ ~:g~:g tq:~~::1D2g88 8 88$::e88888 88888 .~~ .~o ~ .. ' 'o":";":''':gN~.oNNmi 'd '~.omr-.:":~~8~' 'NN",,~"'; ":0.0 M Si:li-lJj ~tI):;NN~lEl~ ~ -~~ t::;c;o .. - ~ "'(~llt ~iiliilNo~m- ~ ~".: ".: N N N ~ ~~o a MZ *N ~1#1eI I I;; - -- 88 ~::i:: ~;;~tDt;8888 ,>I>lSlro>l>l ,>I, ,>1>1, >1>1>1 o.~ ~N. ~ U' '~;:~;:' illi1l~~lUgpj~ gN~~_N ~ .....(',1 .....0_ ~=;; ~ I .. N IN N N "-~~ ~~~~~~~. ~.:I ;;; --- I 0__ ~ _.h air..:..;: l>ll.ll. !il:2:2 -<-<:2-<-< :2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:21:2:2:2:2:2:2:2:2:2:2:2 o ~. :l zz zz ;:-~ ~ w I. z '" --- ~ -~~ ~:~ -.; ~::l~ ~ ~<(<<(<(~<(~ :2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2:2~:2:2:2:2:2 1 ::;zzzz z ~.,.:! I " E ! ~ --- ~. m S'lS813 ~~~::~:&~88 88ill::88 88 888888 .Nh -li !- ~ . ~N. " I Ii' ''';~~~'~cOl'''i'':~''':'''':ci~' , ~ .; ~ ~ ~.; , H 'gl"i"':l1is"": (gli N.... .... 0 M (II ID :q pm~oH~ :;; \JIg) co NlQ""N INN_ ~~ _-".: ".: N N '" ~ E:~ ~i c::~C\l Z~:;N ~ g! I --- < f 8 :8f~~ o~~t;~:&~88 .S ,~~aa. ,>I 888888 _ h 0 L ~ "':"l:~ !~ " 0; , ':g~..;~'r::~:8g~~~:82 . ~ ll~-N 0 'C'liN":C\ig,..; ~~; w \; . 8" ~~~~j1U:: ,..,... ,.. c;o... ...... 0 i~ --' --' .0. .NO I ~ -<Ii :J' ~. .5 2: ww_ ~ ~ "' S~888888S8~SS~8S888888S88888888888888888 <Ii-< !.l ~~ ~ '" ONO~8~~~~~~~~~~~oo~cici.Ng~N88~~~N~cigg~~~~ I Z .. .- NN ....l"11") 1")'- NNNl')I")"I' : Ii ~ .-'" .... .... "'.... ........ 0 ~ ...; ('oj "" " ~~~~~~L5 Z 0~00~0000~W0~~W00WWMW~M0000MWWWMMMM0MMM0 Ii " u " ,,, " -<~ ~ ~ -< ~! z z >~~<~t~~>tzzz~~>>>~>~~~~~>~~~~~~~~~~~~<~ U ~~~ww u ~~~ ~w~ WW ~ W ~~~~~ W W~ I ~ " '" ~ ~N ~ 15 0 ~ r 8 J ~ ,,~ Z n Z Z w ~ ::.:: ;2~ w ~ s I !!- w u ~ ~ o~z~ ~ ~ g " I!! ~o~ ~ ~ :w~~ffiffi~~! ffi ~ i e: G ili~ ~ a ilio ~ ~~~~~za~~ ~~~~~;~~~ s~~ G~~~~~~~ ~~ >m 8 ~ iil!!! ",'" ~~i~~~~~~~~~~~~~;~!~~~;~~ ~~~~~~~~~~i!~ Q Q I ..~ ;=6~<~ I!! o I!! ai". ::liU~O~15uw:J~i--i ~ -0/1 ~w ua:: w~::!::li:E:E:E::i > is U~ -! ~;:o~~w ~8~~gx~~~ w~~w~~~~u~~~~~~ O-~5~~5~~~~8~ "ffi" ii ~O<~b ~ ~~~w~~~~gii5~~~~~~~~~8mo=~~~~~~~ ~~ w o 0 i J:~W~~W~ ~~~~~5~~~ow~;~ffi~~~~~~~< =z~J:~~a~a~~~g~~~ ~~~ t;~&(D~~~ oO>~O::lig~~2~ww~ ~uug~ ~W~2ZO~~~~~~~~ ~g~ ::1;1::: I I :0 ZW tell) . ~~ ~~ft:a~ft:~ ~~t~M~~~m~~~~E~~~~888~~~og85~~=~~~~~~~~m e::e ~" lClClI)OlCU 11)0 m m ~ o~ ............NNN ~ .~ ~ . I I ... I. :s~g31~ t:~0\ I!! ., N 1:0..., r--..;- l:>! W '" N ~d.. ;;: ...~ ., .,.'" -'0 lIfP'''': =>O~ "'~. I g:~M Z W -' <.'l I .. .. .. ""0000) "'N... COC'1CbC'\l.... ~ ;:NCON.... .... :<Illig '" ....&"'It;.~ .."'. I ~C"lt ~ ~ ~~N W <.'l 0 W I .. .. .. ~MONN ...~... ....00 CD It) ~ (")c<:lNY"' Cll!t'!"": ~ ......'" 0 :;:J; '" I Z ....;m W:s_ ~ ~ !!j~N Z <( '" I .. .. .. C":ICOONCO ...... ............(11) COC":lNM.... ~'III;"': ~ ~ "''''.. W ........ I. .."'., Z vi";~ :s~CO ~ N WNN "'~ :s I .. .. .. C":lCDOf'ooCD m....,....lt)co ....... CO In..... lON ....... I N N ....:.,J.~ '" :!:ll5l 00 IDtO..t N '" :;...... O~N I i!'N .. .. .. W OOOCln I '-' 00 CO 1,1)('\1 ii2 "':NolCi"': .. - N .. Z "-"- => fRWfRWW -'-' I 5 .. >-1:;"-Z;;! Z '" => en ..JI-C) ~ 0 ti I . ~ =- 0 ... '-' g z .. t""~ o Iii e :eu '" 0 I [I! ....:~ '-' '-' !z ;;'" => .. z<( W ~o I!: '-' w.. :; "- '" W 20 2 ~ ",;;! z a ~'" W o '" OW !: a: J: :d2 '-' .. ;; I. "'z (1)0 OW o 0 -!! ..i;l; 5" ;;;~ w..w 22 ;f ::E:::iE !;(C!( .fj ;:!i ~U)~~CI) 2:3::1 0- w-, "''''''' ... ::e~. _:I ., ::!:;: :JOrnCDO "''''''' 0 I J: w~w 0 "z I-Z ....Z ~ bi!' iii-:::'::::.- ;;!o4l "'w :j~~~S 000 ZCl ...... "'", Q. ~~ -.. ~.. e~g - :!!<( :!:a:iu m 0 I ---. --- -.---- I or-- r--<oo r-- I. o8~ ~...-o ... .. co '" '" N ~G:!C"'! iO a:: ,,,>c', ~ ....... ~ ...'" ,","co ... ...... :c N M Z I w -' 0 ......... or-- r--r--O ...... N...- "''''0 1-'"'" ~ ...- '"l<<!f't.! I ",0"'- ~ ~ """ '" .... '"COr-- 0. C'!=&"IlI;. ~ ..~...- Z ::> I 0 ......... WOM COOO ...... >le&l ~Ng ~'1~ <(...-~ co..... ~~ ~co.. I C"!.1l"')u:l!. ~ ~ ~ -' W 0 ......... I or-- r:::;8 :,~~ w<oo >"'''' 00 ~ <c;;C"l ~ .."'''' .....-r-- -' cc!'~"II;. ~ '" .. I '" > a:: <..> ......... Or-- ....coo ..r--.. I "'~ ",M'" a::~g r-- .. C"l"!C! co...... ON ..r--CO '" ~"'.... Ie w N N ::;; ~ ......... N<O <0"'0 ..."'~ w"'<o ~N~ -,r--oo ~~~ I <..><o~ "'.... a::~ ~~~ U ~ ~ w I ~ ......... wO.... "''''-0 ::l~" -,en", co~'" . ~ O! <..>"'~ N N o~ r--co", a::~ r--..,,,, I u r-.. NQ.. <( ~ !( ::;; a:: 0 0 CJ Z ......... I -' w <( ~8~ w CJ en ii: "":Lric:i ~ . I>. ~ '" 0' I- 0 I .. LL> Z CJ co "'''' ::> ......... Z ~ .. 0 '" co e ~ 0 .... -'ZLL CJ f!! Z c3l-...J ::> t; I z<( ::> a:: .... w w.... '" ., ::;;0 -' Z 0 w'" <( 0 a:: ~w ii: CJ 0. 1;; a::~ Ww o 0 2 I. 1>.- ~!( w., w " :E::;; !(O!( ~ ;:ui' ::;; ",ffi;;;! ::;;;]\::;; 0 w-' w -::c- .. w= !::: ::>a::w ....a::.... 00 a::::c 00", "'!!;!'" 8 w w I ....Z ~~'" -'0-' !9 "'w i~ ::;; CJ Oe coo ::>N02 ~ ~ 8la:: !:::<i: o~o ~ ~<( lllLLU ~~1- <; I - , . CITY OF ARDEN HILLS f' MEMORANDUM DATE: September 8, 1997 I TO: Mayor and City Council I FROM: Kevin Ringwald, Community Development Directo~ SUBJECT: Planning Case 95-16, Final Plat - Red Oak Ridge, I Balfany Development Company, 2035 Thom Drive I Request The applicant is requesting approval of a five lot detached single family final plat (Red Oak Ridge, f.k.a., Oakridge Homes) on 4.63 acres, zoned R-2 Single and Two Family Residential I District (Exhibit A). The request includes a variance from the required right-of way width and cul-de-sac diame1er. - =~ . .-- -~. ""';;';., ..... I - Backl!round . . The City Council on June 30,1997, approved the Preliminary Plat (Red Oak Ridge) including the right-of-way width and cul-de-sac diameter variance at Thom Drive in Planning Case #95-16, -. subject to the following conditions. 1. Compliance with the approval of the Rice Creek Watershed District (Permit #96-105). I 2. Preservation of those trees shown in the Tree Preservation Plan. 3. Payment of the appropriate park dedication fee. I 4. Provision of an updated abstract of title and a development contract prior to consideration of the final plat by the City Council. I The City Council also authorized the payment of park dedication ($5,124.00) to be paid in one- fourth (1/4) increments at the time of the issuance of the building permits for the four lots (Lots 1,2,3, and 4 of Block 1) which new construction is planned (Exhibit B). I - Planning Commission Recommendation The Planning Commission on June 11, 1997 recommended approval of Planning Case 95-16, I final plat (Red Oak Ridge) including the right-of-way width and cuI-de-sa~ diameter variance, subject to the following conditions: 1. Compliance with the approval of the Rice Creek Watershed District (Permit # 96-105); I 2. Preservation of those trees shown on the Tree Preservation Plan (Exhibit A, page 6 of 10); ~ 3. Payment of the appropriate park dedication fee; - I 4. Provision of an updated abstract of title and a development contract prior to consideration ofthe final plat by the City Council. it I .' - , - Updates The applicant has provided the Staff with the updated abstract of title on June 26, 1997, the .. Attorney has reviewed the title to ensure ownership and legal description. Also the attorney has forwarded a copy of the development agreement (Exhibit C). The applicant has reviewed the document and found it acceptable. The Staff is in the process of getting the executed signature page from the applicant and will have it available at the meeting. I I I I - I - ~- < -- :;,....~.-""'- - .. ., r.... I -- - I I I _. I I ;-...- I --- I .. , I . t;..><I+llSIT AlJo I , OAKAIDGE I , , , , ;r;.t I , I , " :"'1 I , J , " I " ~r-:) " J I J , " :a -- J i I I " M (:J I I I I ., " :'3 r---2;"_; ., ., ., , I ~~, , I --- .. I no I fi. '" , I . Ll&L. r,~ ~ , , , "" ;, :J ~. , ;t"J I , ~: ::: l:- ,~.I. I r,;: I -... , " / tOeA rlO'" M4P I " " , ft ..... -- I . , --- ~ . '. ..... M::: "-----. , , "- ~',."'....... ./ .-.....t. r1' J , ......--~-... _._-~ .....,1, \ ~ " "'. -.....././ '- ~ .: 4 0 I .{;.--"" :: ~ z " :::- tf..J-/ ii' ~ )/ , " <> " ~ ....fJ -, :n 11'<1:'_,,,,,,, :~~ 0'. , . . .. I //~f"t.,"':".. - . - ., " ~. ~~ .... - ..... ';I!' ....... ~~~.~~.:;.~..::;~ "'. .X" I ' . '- ,,' ~. .".... \ !.;;:"I::I:.'~r " .-. -- .: '. ~'t. "'~rS_'~":>r$t'''''' -. "'::-- \~""''''''......... !r!ti:"'S~,.::~:: I - -{ I I , '-" :=:h";~t""..:\~~-~_ ,'. '.. " , , 'Q ..- / , . '. , , .:I{...'"'II........o.c..__~'...... , , " , . .: ~...~-.-... " I + " ,) I --- '. --..,---- . ,,.... 00-. 14'.50_' " I I : :HO~.: --~-JLL_~__ ------------ ~ :::::::'..z i I ---------- ---------~ r--__.-___ :~ , ., , I =-':'~~:'''..-:.JO:'::'", ::='~:W...""Ll~ I I ::~ I .ti I JAMES ~.!:!iLL INC. - I . " -- - - - . , " .. 1l " 2ft r~ @ " r'-j>. s' " " .~ I - 0 '" o~<" . ... - d - - I z - -. >- , '$ " i % tjl c: sa ~; '" .... ...it I \,;.It'S ...; 0 g~% ~~ i a:io ~:i z "I" g; '"' :3 ~ 1i! --' 0 t; a! I w B ! '" w >- '" G w I De -~ .....~ .. .- 00'( - - ~;~ - ~ r. ~:' ~'~.~. 0 ~ I " ~.,,:~...~ -~ === " ......" - -,- . . -*'''r~ _~ool "...1 .- ,..c- . . Il!25! ~."~.fI . /.:':,;J1'; "'1If~ u......~ ,___- 1 ( .. c.; S _~ ".... ;'.' I=.=:;:"'...... . - - "'.997 =-.-- -. , { ..~ - I -- " J.;1:lES R. Hill INC. . I . - . . . _. - - ., "I " . ',:"'1 ~,' ~~ . ".-\ . ~L - IIQ ~i; v ._" , :r: .' , "'; i;; ....;.. ~j; V"I.....! . :iI'" oM,lMP :rr.:c.",..._ ,... ~;; , ~.,,*/ ~,. B.2il \ L ~U' . -' . "..' L . A. ... =1'0'3"- I I ".c .r;, . =".,.,--- \:---- "';"~' . :' . ",~. -== "~<' ': . 'j'I;"'~ I ""~' ,/.<".... ;il,;i;;!~~ '- , ....., ". "'.I;;',." . , ' /' . ~~~. . 11,1,11e-...~ ""),t, \...~. ..... .< , "0."\ ".......'.....;", .........:..... ....c.:... ~..... ~c) ....~ '1. : '.l." ..., '.. '. I I ",'.." .."'.,, 't." ':'. . ...., ....... t ,'0, , 1 I " ...~.... ....l~" \ '., !t,n"'n.. ')Q J "~:} \ \ ." ~.... \ '. :$ '!: ~::-'_. .....'t~J ;;..,,:;,' ..... ~ I - - '"'" , ... ~___ ' " \" i' I LO" ~_ ~':.~ I i I..W.... -=, ~I~ ~f - _ ,,- I .. ,l; -I __.. '. '''. I' - i~'i!. ........ __. " .'....,1' - ;11 ~ ~" ~. . ,of := _. ..... I' . I :::: .~. E? l...., I' ~ _. _-':0'-.." 1.01"1 ._. ':: ..:. ~_.~-- -- -, ! __ """"'- ' "_ _"", I I - =.:.."':.. .,- .:: . ! ___ .... ,,,._ I ::._._ ~;::;, " I _ .,_ " u _. .~.." I __ =_... 0'" _. _~,.;~ ~ --!" ,;;~'.."!'00I".: -..... .....,- .. . . .. ...;"'"... I -. . "n.... -"..,' I I . - .. - ',. - tlr~ -- ..... ,., .._------~....----_........_....._...._-_._~--- I -.---,.-." ......... " :J ~ ~ I " ,.. " " .= 'I' .~~l ~; r ,.' ~ ~~~ c. ~ .:.~: ., ~~H .::"'. it.," t.#i::~it: -.-. ~ I u~iI.><O 'C../ ' , .- <;;;;? :::::: :::::.' ";0. / !\\\\~\~i; --- .---... 'i);~ '""'""::;'- :::::~::..:':.. I ,," .............-.............- . " ' -- ...-....~....~ J , ~ --- ~ , .-.-......-..-.. 0 :. .--- ~'"':".=:"- ~ ~ :::.::'::: ::::=~ z I 0 u ., 0 , P\.AH VlE.W ....~~.:;. ~ , I ~~..... , o \oil \ c: !: " ulJ~ ~; I ,4,-") ''-, g~d-~~ :!:o::::d - .;~ N 0 ~i~ ~\ .... ..~ .--. ,- rj ~: -- ,. al I ".,~ " . < , SECTlOH A-A , . .. E . >. ~ .~I ,I> to.,' ... ~ , ~ - " ; __ I - ~ ~'- ~ ~L:- ~:=. '\ ~. . 'aD I . .~ .., .-.-~~ l...... ""' r ...~.... . L:.._-1-l-,- ~~ ~~ ",(~"'G.' TVl'IColl.STN!TSS~ ::.~ \ " _ L:il- ;.' " - UO!!IOlleOIlTAOI.OITAII. - T............-. "en> ~.,n I"" coul2 Ar I.., 11'" G' "..", e,,_IUVC:f'O" 0" .- - - I I - .' -.'-- .- -- -- -- .---- _. ==-- "', '- __ _---,,~ ~l' ~.,,~...... __ ~"J . . . 7.-=- 'OS .,,_ r~= I -.,-",-. . ~' .'- .-. - ~ '. . .....". .," _. _ .. 0 ". UL~-- =::~-=- / ,:: ~.~ __.r". ~:€- 1 E,l;i E."''' I <I' , ~ ~~ ~ ....- "'"" ,....- -. .. - ,.. ,~ .-0 · ~- - . .. ~~",-" - . -,' -- .' I ......--- - - .=-"".,- .. "'._'_ ....__ "il'I'Ej~;j"\" ... .. ..... .,l,': 11-(; -- --' . =-:=-..;l'~ES ~!ir-tTf- _.. _...w r . . __--- I 1 . --. --..,- . . , . ::-...:::::".-.. -.. .--- ,,,,.. .. -.------ . - -,::.. < _.__" ., =__. ~ I tJ "",... -="z,;" !:: ~! s - ~..,,-- ~ - .' ~.".~" g!1! "I =i C:J--. d"!~; -'- "- ' ,., " J~ 1 ..,_ -- .. .f. ,. ~A~ .' , .. ...... -- . "I! .. __ ~ _..".. .. 0 __ r-.:- I ._....,~ ,,( ~- -- ., ~'':~ --' - ~ . -, ~ I - ..___. ~.~._.~~.:: I, I.. f'i-":- ::: .._-""'-='''~' -----~..::.; -. ,:",~.--' ...".. ..." ,...-' I -...-.. -- ~ ---....:-.- '" . ~ __-.. N_ --.. .....~~r.. . . - .... 'd"" I --- I / I I . . - ..... -- .- ~~I I .l- ~, " clhl '11 ~'I >" ~ 'I r:: f' /..J . -.' .!i.m ""'/P, u ~~t.. I --~ ' ~-~ / :---,- =.-- ::.::.:: ~......- ~ ~@ -~ "r """"",,,"lTMI""- l:.. \.... '% . I't l~ . ~! ....;...- 0 L: I -.......-.-.- N . '1:1 ^' , '", ' .' ~. ... ~ I w~_ ..~ ~, '.. ,,4,..... ~L.: .....' , I '"'" -. ...- ',. ...... lI..r( ',' -. , -, _:? 'r""::~ ~: I ::::... _.. .~: ' -'. -' -------.' =, - '.. '~:\A /..\. 1I '"~r, ::;:', I '.' i.... V. . _ . .... .'., ...1" " ~~ , .. / -". ::;;.JI .. .. I I I I I ..... - 71r~ I _ , . SITE LOCATION U i ~ ,!; i ~ ='~I i: !: " c.:: J II fI ., .. "'~.' .~: -- ~., .. " '" .i . ~. .".'. \.~, I '.. '..' ....1" . ;"..".., · ft,q;J r.dll "....~ 'h;i;Jtil-j I , -" / '~. , ''I' , . ,~ ~ I I ,- " ffi \"it - . .' ~'- w Vol ..I ~-'_.-..- C~ ~ ii .- Q.%!:Ij --'-"'-- .,... -- '.. , I , I'd: N ... ><, '. , " -~- . . . .--."' ',,- '- , ' !tJ : ;~.t:t- - -::, <" i. __ ' _ _ , -- ;, --- - -- -.. - . '--- -- - " ,-.-- -- '" I - l'ICol.LSTRIrrseC'TlON "-- E? _. b\Ol(~'I!;: '. ... ~~~ ?"".~ . , ~ -- -- --" r-- ,"-..' I ..-. ~ - / ~ .--- 0"., . .... ~'m ,-",,",. ~I. I ~. .... ~'~ -'~;;~ ' ~ ~ . ._~':-- ": .!! ---. --~,.c.c.c ~~ .......-.. ,...COl........... ... ..- I I __ I I I I .. I "1P 'I n" . "" .1 .L. V" ~~L . .'" ~ ~'; .J ~:; '.' '" rj i ~ i ~dI , '"", I , ,,,. .' / \Il4(HI;> ,--",,' ',' q, = ___ ""h"'~ -' ,-- ,,"'," " = _.- ,,""" I ,,' - -'-- ,,,,,,,, , __ .__.,.,..,.J,""; J ," ,-,-' " ,,,., , -- .,--_.~ , . --.--.. , ,. ;;; ~:~~:- ~ I ~, 0 ~"." ",' ' ~.", !,! ._ 'h ' ' _ c;;,. , ,,' ," '" ,! , . - ' - ,.' ,"' .. .__ _._~'. v,_ ,<'0"1 I -,,' .,< ' , --" ' . .," .' , ,-~' ",. ' , ' : " , ' .., I UcnOH A.~A _ ,. _ 'U . ...., . S . ..,..." ' . ' , b ~~~~." .: .,~" 2:, I: ,,- ' 1 , t c:l: _.= -- 1'__ I ,'-_ L__._ ......,,,.. ." "''Pl''':' .~" """ ~'"-' ..r+. ",.\ I .~ "" ,__ - 0'" - ' , -- __" ..n"."~"i. _ _.<<,- II !.. v ,,/' :"., G' ~...~, :::''''''''_ '",. . _~ :,. ")'1,' 'S' " -- T...C.......... ." ...."..............nu>r..- .. _~ .~J;.i,..~1:o~npvoTlG~ __ ' 'H" -'" I I I I I - I I -- I CJ,{ ~ I. .~!, .--, ; :Z:::~l ....!H. 0: ~ '; CI)::':! M el:!;i ~ ~- -_! ~ I I t ~- '.' ' I _..-,;. 'iil' ';: ... IICII\' I I ,.,,_ """1" ,., j' ,'.' I J ~ fliJiiH-~ ---...." .... ~,- -L _ _,_ ___ : -.- --- w ___ _,___ - l ~ ~ -:::.;::: _a_ " , :;;:,- ---- ~ ,l " 'm__ I , ~_,___ ,,, >' 1 ' /_ . , . "". , , . , .,-.- 0 _.,., _._._ . .,.,. ' . ,,~'""- .. '" .'-" : . , -, - , , , , I , " O!"'I h:::',~= P'i":-'"" Tit: ]'tt!1' L~'", Ii!!! '. . '. . . ". . . . . . . . . . . . . . . '. '. . " . '. . '- . I- I I I I- I ,. .. I 'I ,,; .r= ~ ~ ~, ;;;,. ~i I X.....1 .... ~..~-~..7'.::- . t.:ft~ '( (-) -- ""L IH$\JI".I.TIONOUAII" en ::::'"J 4) "'.. E '" ~I '" i i! ~. , I .. ...,.. ~~~ ~ ~,. ;=u- . " "~"~:'!' '71~:~ ~.a- t "'~...._.._. '" " ''''''--':-= ,.,..1..... ._ ~:J"......""(,..,._.. W.""C '.:':.::';_..~..v. III ~,. { I .....r..:'~.._ . ! PAV~Ml!N'l'SECTI()H E:":;~.. \li!:!!~~; -- 1Il_' IR Dn04~"11 ,~ "O\I.,.,.~&_.ovrr r-w:-l-=I ~l;h}~;' , -=-.- =--=-=-.- 1(: "";' '"'~ I - r uaRW HwU 111&..110'-1 . C!JI..-DE-SAC , , ..! ..f -; ~1I111~-~~) &1 3 ~ I ~~=r?~ ""~ r:; , -. t---..- """-.1' - ~~<li!gi ~~.. ~ ~ a;. =.-M~~ ;:i~ :-:i \'IClDI''''''' :~~~~~'-" :3i~ ~: I W&nIllIU ,~, Q :.0:1 .. - , O' ::-~l- ! , . nO."I'<;.t.rc~...,.. A 's-~~~~-5i ".._ i~~~:r"'l!.7E...- I CU""II""~ .Ii =: _UII.....-":" .U....CoIl ~.::: .. ...... '. :::"-- - tfi: ,., PSCOl.ICI'tONOVSC .,,,~. .............1_ . _1lIo-" ~~- --. :::0:':--,:""" . .'-, I _~- .E:~~1i:~~~ - ~ '--~-.T._ ENERAL NOTES ~~~=l'~n~,,- - ;;~~~?f.- ~:4.~""~1.iz~ \ -- :-_""':;;'- :~~~~ I 'F~-'- ":"':"~.:.:..""" ~~.... :;:,IL, ft' ,~, ~":~~'-"'__ I. :..""':;::................ . -- ......... 1 .....-...: -- -' 4- _~ ~~__._ . ==.:=~- I --- . ,...rur n.."'.....~'"'. -r.=-.= - -.:r=.~.:=:-- _"'H""_"_ =---o:r-..- ....N-our h_ UHIf.ollr IKWI_ ~ I .. - ^ I -- - I I --.- I .. I - I' ~6&r ~ I~ I I CITY OF ARDEN HILLS ,. MEMORANDUM DATE: September 3, 1997 I TO: Brian Fritsinger, City Administrator cs~ I FROM: Cindy S, Walsh, Parks and Recreation Director SUBJECT: Park Dedication for Balfany Planning Case #95-16 1 Backl!round I According to Planning Case #95-16, Mr. Balfany is developing an area of 4.5 acres for residential housing. I do not see a benefit for accepting property in this area to fulfill his park dedication requirement. I will be recommending a cash in lieu dedication rather than land. I 1 have spoken to Mr. Balfany and have sent him a letter outlining my recommendation for a park dedication fee. - - .. . _. 1 - Park Dedication Fee Calculation ,. Since the density of the Balfany Plat is 1.08 dwelling units per acre, the park dedication fee would be six percent of the fair market value of the property according to our Ordinance Section Ie 22-9. The fair market value of the property was based on the payable 1997 tax value established by Ramsey County. The first parcel is .64 acres (20,200 feet) and has a value of$17,200. The second parcel is 3.86 acres (168,391 feet) and has a value of$68,200. The total value of both 1 parcels is $85,400. The park dedication fee is six percent of the $85,400, which is $5,124. . Recommendation I I am recommending that the Balfany Planning Case #95-16 pay a park dedication fee of$5,124. The City Council has previously agreed that this fee can be paid in four equal payments. A I payment of $1 ,281 will be due at the time he applies for each of the four building permits: I ~. I I ..-- I .. ~ I - . - ~ --.... . -.-.--. . ._~. -~.._-... -.- - - - '.-- - -- . _. .-.-..--. . .-... --..-. ...- - I ~KIh6If C 'I.., I Dl!:VELOpHll:1I'1' AGRBBMBlfT t- RED OU RIDGE 1.00 Parties. This Agreement is dated the day of , 1997, and is entered into by and between the City of Arden Hills, a Minnesota municipal I corporation (herein "City"), and Oakridge Homes, Inc., a Minnesota corporation (herein "Developer"). I 2.00 Propertv Descrintion. Developer represents that it is the record fee owner of the following described property situated in Ramsey County, Minnesota: I Lot 25, except the West 200 feet thereof, Rohleders Bome and G~~de~ Acr~s; and Lot 26, Rohleders Home and GaL-der. ~t..,r"'s ihoth herein "property.) . I 3.00 Final Plat Annroval. On , the City Council approved the final plat of Red Oak Ridge. A copy of the final I plat is attached and incorporated herein as Exhibit A. The City's .approval was conditioned upon the Developer ent~rin!L , into a development contract which describes the Developer'S. . ..- responsibilities for the construction of improvements. and 'the , I - dedication and payment of various fees all ~n compliance with . the CitY's.SUbdivision regulation. . 4.00 Terms and Conditions. NOW, THEREFORE , in reliance Upon the Ie representations contained herein; in compliance with the City's Subdivision Regulations; and in consideration of the mutual undertakings herein expressed, the parties agree as I follows: 4. 01 Imnrovements\Adm..~J.:lis;-.::;:."t:i.::' e ~_~ Tl1e Developer shall construct the fallowing. in'l?L'ovements in compliance with I plans and specifications revi~ed and. approved by the City's ConSUlting Engineer which are attached and incorporated herein as Exhibit B. I A. Site Grading:. Site grading improvements shall be.'" completed on or before October 31, 1997. I B. Water Main Imnrovements. Water main improvements~ shall be constructed on or before October 31, 1997. C. Drainaae Imnrovements. Drainage improvements shall I be completed on or before October 31, 1997. D. Sewer ImProvement~. Sewer improvements shall be I completed on or before October 31, 1997. I , i .. ., I __.._.._._._....._..__.._.._ __,. __.'d.. ..'-"--' ......--..... ,h'__ ._h 'I ~1 I E. Street Il1IDrovements. Street improvements include .. eubgrade preparation, gravel base, bituminous surfacing and bituminous curb. 1. Unusable material within the roadway shall be I removed by ",h'~ (.;evel':>per. 2. All subgrade ex~avalion and filling shall be completed by t.h" Dev<!loper in accordance with I MNDOT's specifications. The City reserves the right to teet as necessary, at the Developer' s expense, all grading work. A test roll of the street subgrade shall be passed prior to I acceptance of the subgrade by the city. 3. Subgrade and the initial course of street I imp!:ovemente shall be completed by October 31, 1997. The final wear cou!:se of the street improvement shall be completed by June 30, _ 1998. ._ ,." I F. Non-DeveloDer Utility IDlDrovements. uti:U,ty" .. im. provements include underground gas, electric; and ' . I - telephone service as installed by the appropriate utllitycompl\nv ;.':.-ti'" d::,'sction of the Developer. 1. The Developer s111.11 arrange for the ~ installation of unC:erground gas, electric, telephone and cable tv after the first lift of asphalt is complete but before the final lift is started. I 2. Non-Developer Utility improvements shall be completed by November 15, 1997. I G. LandscaDin<l/Erosion Control. Developer shall provide the landscaping and erosion control:" improvements described herein. Landscaping shall I continue to be the responsibility of the Developer even after lots have been sold. 1. The Developer shall preserve trees as shown 'on I the tree preservation plan attached as Exhibit D. ' . 2. Developer. shall seoa or sod all disturbed I areas outside' of the street right-of-way within tell (101 days of completion of grading. 3. Developer shall be responsible for installing I and maintaining erosion control measures as 2 I '.. .. '. I ..... "-'-'.~'. '. .............,_Y.' .. ''-l.'. ...........'......~.l ~..- ...'-'''' '..."'.... .' ~ .........,.......... ~1'-'\...JU., . .'-1....'. ...........__....... v v ~, I' 3/1 1 required by the City.'.s Consulting Engineer tlnd ~ with the preiiminarr and final grading emd erosion control plans attached as Exhibits B and C. 4. Landscaping improvements Shall be completed by I June 30, 1998. 4.02 Administrative Fees. Developer agrees to reimburse the I City for all Costs and consulting fees which it incurs in reviewing the development of Red Oak Ridge and in supervising the cOmpletion of the improvements required by this Agreement. I 4.03 1 Imorovement. Estimated Cos1;, I Site Grading $27,000 ~t - - ~ ---- < Sanitary Sewer $10,000 _. Water Main $11,500. . -_. , . 1 - ,Drainage Improvements $ 5,500 Street 'Improvements $31,500 Administrative Fees\lnspection $ 4.500 Ie SUBTOTAL: $90,000 + 25'$ $22,500 TOTAL AMOUNT OF SECURITY REQUIREO $112,500 1 4.04 Imorovement Security. Prior to the City's endorsement of approval on the final plat, the Developer shall deposit security with the City Administrator in an amount equal to 125% of the City's Engineer's estimate of the cost of 1 constructing the required imprqvements and payment of any administrative feES :::eql~.iT.~d IvL:-ein. The secu:dty m,aYbe in the fonn of a cash escrow fund, d performance bond, or 1 a letter of credit. The fo::-m of security shal1 be approved by the City Attorney. , '.....'1' . 4.05 Reduction of Security. Upon completion of required.~ I improvements and acceptance by the City, the City Council shall redUce the amount of security for the completed improvements provided that in no case shaH the total remaining- sec:urii:y be equal to less than 125% of the I estimated costs of the incomplete improvements and of the estimated and unpaid administrative fees. I 1 3 .- " , I . . ~ - - - _.0_. - -. ~.-~. . on'_' __. ..~.... -. - - - - . - -- -~.. ~. ,-,-"'-~.' ....... --..-..... 'I t.J11 I 4.06 Miscellaneous Reauirements. -. A. The maintenance of the cul-de-sac island is the responsibility of the property owner(s). B. The lots will be custom graded at the time of sale. I The final grading plan and tree preservation plan shall be followed. C. The installation and maintenance of the sewer I ejector pumps and service lines are the responsibility of the property owner(s). I 4.07 Public Use Dedication. In addition to the costs of improvements and admini$trative fees, Developer shall pay the appropriate park dedication fee, as determined by the I City's Park Director. The city Council has previously agreed that this fee can be paid in four equal payments. \ A payment of $1,281 will be due at the time the Developer applies for each of the four building permits. I , - . - , -- .. . 4.08 Inspection. Developer, through ite Engineer, sl:\all ._, provide for competent full time inspection durIng , . , I - underg~9und pipe construction and street construction. The City Engineer shall make periodic visits to the site to insure that the Developer and its contractor are in compliance with the terms of this Agreement. The City fI En~ineer shall be,prov~~e~ a minimum of 24 hours notice pn,or to the commencement of underground pipe laying; and prior to subgrade, gravel base, and bitwninous surface I construction. Developer'S failure to comply with the terms of this section shall permit the City Engineer to issue a stop work order which may result in rejection of the work and which shall obligate the Developer to take I all reasonable steps, as directed by the City' s Engineer, to insure that the improvements are constructed and inspected pursuant to the terms of this Agreement; and I shall further result in the asse.sllIllent of a penalty in~. amount equal to 1%, per occurrence, of the amount of . security required in section 4.03 of this Agreement. . - I 4.09 Bindina Effect. The terms and rrovisions of this agreement shall be binding upon and ~nure to the benefit of the heirs, representatives, successors and assigns of the parties hereto and shall be binding upon all future I owners of all or any part of property and shall be deemed covenants running .with t-he lana.. This Agreement, at the option of the City, shall be placed of record so as to I give notice thereto to any. I}ubsequent purchasers and encwnbrancers of all or any part of Property and all recording fees, if any, shall be paid by the Developer. 4 I -..- .'. -. > I I . - .... -- ..... . q - -.. -.... ...... si1 I 4.10 Notice. Whenever in this Agreement notice is required to f' be given by one part" to t~e other, suoh notice shall be delivered personally or shal~ be sent by certified mail, return receipt requested to the following addressees. Such notice shall be deemed timely given when delivered personally or ~hen deposited in the mail in acoordanoe I with this section. ]:f to the City: I City Administrator City of Arden Hills 1450 West Highway 96 Arden Hills, MN 55112 I ]:f to the DeveloDer: I Ron Balfany Oakridge Homes, Inc. 5500 France Avenue South Minneapolis, MN 55429 I 4.U Evide~. Of \leeord,"o. Pmlo,er .ore.. to provid~.th, ' co_ City with evidence that the plat of Red Oak Ridge hlis '. I .-::... been r!,corded prior \;0 the Iieveloper's request for a second-building permit. 4.12 Incorooration bv Reference. All plans, special Ie provisions, proposals, specifications and contracts for the improvements furnished and let pursuant to this Agreement shall be and hereby are made a part of this Agreement by reference as if fully set out herein. I 4.B Defaolt, Th. o=nrre~e of any of the fOll~ioO .hall be considered an "event of default" in the tenw;; and . I conditions contained in this Agreement: . A. Failure of the Developer to comply with any of the terms and conditions contained in this Agreement. I .. The fail~e of the ""veloper to o""Ply with '''Y,,' applicable ordinance or sitatute with respect to the,. I development of the Property. . . _ 4.14 Remedies. Upon the occurrence of any event of default, the City, in addition to any other remedy which ~ay be I available to it, shall be permitted to do any or all of the fOllowing, as it deems appropriate: , A. City may make advances or take other steps to cure I the default, and, where. necessary, enter the Subject Property for thatp~poBe. The Developer I 5 ,. . I _u __ ~ -- ~/1 '. ahall pay all sums so advanced o~ aXPQnses incurred I by the City, upon demand, with interest from the .. dates of such advances or expenses at the rate of lOt per annum. No action taken by the city pursuant to this section shall be deemed to relieve the Developer from. curinq any such default to the extent that it is not cured by the City or from any I other default hereunder. The City shall not be obligated, by virtue of the existence or exercise of this right, to perform any such act or cure any such default. The Developer shall save, indemnify, I and hold harmless, includinq reasonable attorney fees, t,ha City ,,:.~'~ ..ny J:'.ab.Uity or other damages which may be incurred as a result of the exercise I of the City's riqhts pur6~ant to this section. B. Obtain an Order from a Court of competent jurisdiction requiring the Developer to I specifically pe~form its obligations pursuant to the terms and provisions of this Agreement. C'_ Exercise any other remedies which may be available. I to it including an action for damaqes. '~'. -- - -P ~. -. D. Withhold the issuance of any or all building' I permits and/or prohibit the occupancy of all building(s) for which permits have been issued, E. In addition to the remedies a.nd amounts payable a:s ~ set forth herein, upon the occurrence of an event of default, the Developer shall pay to the City all fees anu eJ>pen:.'r'.'^. i",,~.u:\inq reasonable attorney, I engineering and consulting fees, incurred by the city as a result of thebvent of default, whether or not a lawsuit or other.action is formally taken. 4.15 Prior Land Occuoancv. In the event that lots within this I subdivision become occupied prior to completion of all improvements and acceptance by the City, Developer shall provide all maintenance necessary including street snow . .. I plowing, until final acceptance. ' ~ I I ! I " 6 I .J .. ~ I I' 111 I IN WITNESS WBE~OF, the City and Developer have caused this ~ Agreement to be executed as of the date and year first above written. ~XT~ OF ~~EN,HILLS I ., .:f bennis Probst 1 Mayor AT':l'BST: I Brian Fritsinger I City Administrator 1 In the Prese~ce of: DEVELOPER: Oakridge Homes, Inc, .. . ,.. --. , - By' ~ S - I _. Ron Bl"lfany '. -. b/AH/bolfony2.AGR 1 Sept.~r s. 1"7 1 1 . " 0 ~ 1 ., , , I , I ' , " 7 1 it - I . - I I CITY OF ARDEN HILLS ,. MEMORANDUM DATE: September 4, 1997 I TO: Brian Fritsinger, City Administrator Cindy S. Walsh, Parks and Recreation Director {'::;vJ I FROM: SUBJECT: A warding of bid for Cummings Park Wash-out Repair I Backlllround At the August 11 City Council meeting, the City Council authorized the solicitation of bids for I the repair of the wash-out that occurred at Cummings Park. The engineer's estimate was originally $42,000-$50,000. Engineer Stonehouse believed that to be a conservative estimate. The bids were anticipated to be in the $40,000 range. I Bid Results .- Name of Company Bid Amount I - Rehbein Construction $30,905 Jay Brothers . $34;395 CCS Contracting $40,880 Ie Sunram Construction $44,525 Engineer's Estimate $40,000-$50,000 The apparent low bidder is Rehbein Constructionat $30,905. They are able to begin the project I September 11. I have set a project completion date of October 15, 1997. Rehbein Construction does not anticipate any problems completing the project by that date. I Funding I have applied for reimbursement funds for this project through the Federal Emergency I Management Agency Program (FEMA). Since Ramsey County was declared one of the areas to receive disaster relief funds from the Federal Government, this project should be eligible to receive funding. At this time, I believe that 75% of the eligible costs for repairing the wash-out I will be reimbursed. I will be attending a meeting on Friday, September 5, to learn more about the program. I anticipate having an update on what costs are eligible for reimbursement at the City Council meeting. I Based on previous discussions from the Council work session about the funding of this project, I am assuming that the remaining 25% of the project cost and possibly other non-eligible costs I would come from General Fund Park Maintenance fund as an unbudgeted expense. Recommendation I I recommend accepting the bid and executing the contract with Rehbein Construction for the Cummings Park Wash-Out Repair Project. I also recommend applying for any eligible funds .. from FEMA for disaster relief repair of public property. I . _. - - -..-- -------- - .-- / I I BID SCHEDULE FOR: CUMMmGS PARK W ASHOIJT REPAIR (8oo340j) -- CITY OF ARDEN HILLS, MINNESOTA I SCHEDl TLE 1.0 I I EMBANKMENT EXCAVATION 630 CY 1-'\ .?O I ry Q/3'7.00 2 CLASS III RIP RAP 340 TON ~? .CO / TI!lN 11'100,00 3 GRANULAR FILTER MATERIAL 340 TON /7.&;0 / To N 15950.00 I 4 TYPE V GEOTEXTILE FABRIC 700 SY Z..OD /1>y 1400.00 5 2" BITUMINOUS TRAIL REPLACEMENT 320 SF ~.1r;I'5F 1'12.D.DO (INCLUDES 6" CLASS V BASE) 4.rY"f\ .00 / Ac.. I 7 TURF RESfORATION 0,25 ACRE J 000 .60 30.QOS.DO I - THE LUMP SUM BID FOR THE ITEMS OUTLINED ABOVE IS: - I 3D, "oS. DO .00 S THIS PROJECf WILL BE AWARDED BASED ON THE LOWESf. LUMP SUM BID. eI RESPECTFULLY SUBMITTED: --,,:) -/!; C~ I ("tbl...J ~E:JtbEl"\ qUrIlI\-,.,,,,c.,. SIGNATURE COMPANY I VILE.. r "e. $I Df:,N-r t;r..t;1 tJAPt~S. ST. NE. TITLE I B\..AINl. M "" .:;..,44"\ , )e--ADDRESS I LICENSE NUMBER Q 1'5/'17 (SEAL -IF BID IS BY A CORPORATION) DATE I II _ lrn'7~i'ClCDlj" ~(~dJ PHONE NUMBER ATTESf I vl'z..'794" (pOO J FAX NUMBER I .. ~n~~lericaI\800340J .xIs 4A I