Loading...
HomeMy WebLinkAbout04-058 . . . CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO. 04-58 RESOLUTION REVISING WATER, SANITARY SEWER, AND SURFACE WATER UTILITY RATES EFFECTIVE JANUARY 1, 2005 WHEREAS, the City Council established a policy to review its water, sewer, and surface water rates on as needed basis; and WHEREAS, City had hired a consultant to conduct a Utility Rate Study and had revised the City's utility rate structure based on their recommendation; and WHEREAS, this study has determined that the rate increase is necessary to enable the utility to remain self-supporting while having adequate funds to maintain and upgrade the City's infrastructure that supports the water, sewer, and surface water utilities. NOW THEREFORE, BE IT RESOLVED by the City Council of the City of Arden Hills, Minnesota that effective first quarter of 2005, water, sewer, and surface water utility rates be revised as follows: Service Description Water - Residential per Quarter: Senior - Winter (no base/minimum) per 1,000 gal. Senior - Summer (no base/minimum) per 1,000 gal. Current 2005 $ 2.15 $ 2.47 $ 2.20 $ 2.53 $ 21.95 $ 25.24 $ 2.15 $ 2.47 $ 2.20 $ 2.53 $ 21.95 $ 25.24 $ 43.95 $ 50.54 $ 2.15 $ 2.47 $ 2.20 $ 2.53 $ 33.95 $ 39.04 $ 50.95 $ 58.59 $ 2.80 $ 2.63 $ 3.02 Non-Senior base charge Non-Senior - Winter (per 1,000 gal. over base of 10K gaL) Non-Senior - Summer (per 1,000 gal. over base of 10K gaL) Water - Commercial per Quarter: Base Charge per Quarter meter size 3/4" or smaller Base Charge per Quarter meter size 1" Winter (per 1 ,000 gal. over 1 OK gal.) Summer (per 1 ,000 gal. over 1 OK gaL) Sanitarv Sewer per Quarter: Residential Senior (base) Residential Non-Senior (base) Residential Usage over 15K gal. for every 1 K gal. Commercial Usage for every 1 K gal. Service Description Current 2005 . Surface Water per Quarter: Residential (senior & non-senior) per lot $ 4.08 $ 8.16 Residential - townhomes per unit $ 5.29 $ 10.58 Apartment $ 33.30 $ 66.60 Industrial (commercial per acre) $ 52.00 $104.00 Undeveloped land (per acre) $ 6.12 $ 12.24 PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 25th DAY OF OCTOBER, 2004. /;/ f'r' / "/1 ,. C -,", I /-" !. B~~;1;'~~~k6~:k(~~1o;#~d'!!L ATTEST: "I' - - - .,,' . e'l \AI/ - ('I I / I /', . I 'I / ii, i I .," -', ~ ,.' _ 'I \i 'll L L L L L C "-.. ,C(.. ~~>l {'If Michelle Wolfe, City Administrator i . .