HomeMy WebLinkAbout12-16-25 PTRC
Chair: Dan Dietz (2027)
Committee Members:
Lacy Loosbrock (2025)
Kerri Seemann (2025)
Kate Olson (2025)
Emelia Rogers (2025)
Nancy Jacobson (2025)
Elizabeth Johnson (2026)
Derek Hilding (2027)
Nikhath Nazir Ahmed (2027)
SJ Julius (2027)
Youth Committee Member:
Ted Chesrund
Council Liaison:
Emily Rousseau
Staff Liaison:
Jess Skalicky
Arden Hills
Parks, Trails and
Recreation Committee
December 16, 2025
6:30 pm
City Hall
1245 W. Highway 96
Arden Hills, MN 55112
651-792-7800
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting, strong residential neighborhoods,
vital business community, well-maintained infrastructure, fiscal soundness, and our long-standing tradition
as a desirable City in which to live, work, and play.
Agenda
CALL TO ORDER
1. APPROVAL OF AGENDA
2. APPROVAL OF MINUTES
A. November 18, 2025
3. REPORTS
A. Council Liaison Update
B. Parks and Recreation Report
C. Trails and Parks Projects Update
4. UNFINISHED BUSINESS
5. NEW BUSINESS
A. Park System Plan Update
6. REPORTS FROM COMMITTEES
A. Rain Gardens Work Group Update
B. Natural Habitat Restoration Work Group Update
C. Special Event Enrichment Work Group Update
D. Volunteer Coordinating Work Group Update
E. Trails Work Group Update
7. NEXT MEETING
A. Tuesday, January 19, 2026
8. ADJOURNMENT
CITY OF ARDEN HILLS
PARKS, TRAILS AND RECREATION COMMITTEE MEETING
TUESDAY, NOVEMBER 18, 2025, 6:30 PM
ARDEN HILLS CITY HALL
CALL MEETING TO ORDER
Committee Chair Dan Dietz called the November 18, 2025, meeting of the Parks, Trails, and
Recreation Committee to order at 6:30 p.m.
MEMBERS PRESENT: Dan Dietz, Kerri Seemann, Kate Olson, Nancy Jacobson, Liz Johnson,
Lacy Loosbrock, Amelia Rogers, Ted Chesrund,
OTHERS PRESENT: Parks and Recreation Manager Jess Skalicky
ABSENT:. Committee Members Derek Hilding, SJ Julius, and Nikhath Nazir Ahmed and Council
Liaison Emily Rousseau
1. APPROVAL OF AGENDA
MOTION: Committee Member Jacobson moved and Committee Member Johnson seconded
a motion to approve the agenda, as amended. The motion carried unanimously among
members present.
Chair Dietz said the agenda will be amended to include the PTRC Work Plan under Unfinished
Business.
2. APPROVAL OF MINUTES
A. October 21, 2025 PTRC Minutes
MOTION: Committee Member Olson moved and Committee Member Johnson seconded a
motion to approve the meeting minutes, as written. The motion carried unanimously among
members present.
3. REPORT
A. Council Liaison Update
None.
B. Parks and Recreation Report
Parks and Recreation Manager Skalicky said there was an open house regarding the Park
System Plan a couple weeks ago. She thanked the PTRC members who attended. She said she
Parks, Trails & Recreation Committee – November 18, 2025 Page 2
would provide an overview of the most recent Park System Plan Steering Committee meeting and
the December 8 City Council meeting at the next PTRC meeting.
Parks and Recreation Manager Skalicky said the 75th Anniversary Committee is meeting every
few weeks. Last week they determined the date, time and events. A member of the committee was
assigned an event and they will start working on the details of the individual events. City Council
has approved $10,000 for the event. The celebration will be held on Friday, July 17 from 4:00-
9:00, in conjunction with the Penny Carnival. The Penny Carnival usually runs 1:00-3:00 but will
be changed to 4:00-6:00 and it will be held at Cummings Park. There will be bands, food trucks,
inflatables and a car show. She said there will be a drone show at 9:30 that will be funded by Twin
Cities Gateway Grant dollars.
Discussion ensued regarding why Cummings Park was selected as the location.
C. Trails and Parks Projects Update
Parks and Recreation Manager Skalicky shared the update from Assistant Public Works
Director Miller, noting items on the list that are bold are new.
Parks and Recreation Manager Skalicky said the new item is regarding installing drain tiles at
Freeway Park to address the drainage issues there.
Discussion ensued regarding the timing of a fence installation and a couple of other projects
needing to be wrapped up at Freeway.
4. UNFINISHED BUSINESS
A. PTRC Work Plan
Chair Dietz said the group can use the 2025 Work Plan as a template to create the 2026 Work
Plan. He asked Parks and Recreation Manager Skalicky to bring the 2025 Work Plan to the next
meeting and he asked Committee members to think about ideas for next year.
5. NEW BUSINESS
A. Great River Greening Update – Natural Resources Management Draft
Becca Tucker, Twin Cities Metro Program Manager for Great River Greening introduced herself.
She is excited to update the group on the work that Great River Greening has done in Arden Hills.
They have been working at Hazelnut Park and Floral Park. They are facilitating the development
of a draft Natural Resource Management Plan. They are coordinating with the community to do
work at Chatham Park. They are working to develop the structure of the management plan. They
are focused on the current state of the projects, as well as what could be done in the future.
Ms. Tucker said the background of each park are outlined in the management plan. They are
looking at the future and working with the City to complete some of the outlined projects. She is
seeking feedback to see what useful information her organization can provide for continuing
management and the future stewardship of the parks. Part of the document will be specifications
Parks, Trails & Recreation Committee – November 18, 2025 Page 3
for proposed work that can be done and how to do it. They have templates and specifications for
mechanical removal of buckthorn and species specific issues that parks can have and how to
address them. There are also species recommendations for parks that will work the best at each
one, looking at soils, habitat types and other things that are working in similar areas.
Ms. Tucker asked for feedback and asked what the PTRC is interested in seeing in this plan. Are
we addressing the needs?
Committee Member Julius said she thinks prioritization is important. What is the decision
matrix? It would be good to have a commentary on how bad it is and outlining the logical steps to
gain improvement.
Ms. Tucker said the first section of the document outlines the current state of each individual park.
The “Resource Threats and Habitat Goals” outline the pressing issues at each park. The next steps
are outlined in the third section. It is mocked up for Hazelnut at this time. They wanted feedback
from the PTRC before going back and completing that third section for each of the other parks.
Ms. Tucker outlined the focus is on continued stewardship and management to ensure the results
are long-term.
Discussion ensued regarding the needs at the parks that can be added to the document. She
explained how each section will be unique, actionable and applicable to each of the parks.
Ms. Tucker said they hope to get some feedback on the draft presented tonight and they plan to
visit the sites in the spring to outline the work that has been done so the recommendations can be
tailored to the most current conditions.
Committee Member Jacobson noted there will need to be funding for some of the projects. She
asked if this document will be incorporated into the Park Master Plan.
Parks and Recreation Manager Skalicky said no.
Committee Member Jacobson asked for clarification that the Great River Greening plan is just
for Natural Resources.
Parks and Recreation Manager Skalicky confirmed.
Committee Member Jacobson said this will have to be approved by City Council and she
imagines there is no funding.
Parks and Recreation Manager Skalicky said this is still in draft format. This represents a vision
of the best possible scenario. However, nothing has been approved.
Committee Member Julius said she would like to see it show what will happen if no action is
taken. There is a cost to initiate these, but there is also a consequence for doing nothing. That
would make it more expensive, the more invasive species spread. She would like to see what
residents will gain be outlined. Maybe it supports bird species or some other tangible gains that
can be outlined. She is in support of goat browsing.
Parks, Trails & Recreation Committee – November 18, 2025 Page 4
Ms. Tucker said these are potentials. She would like there to be a hierarchy. It can outline a
minimum stewardship need that would maintain the established habitat. It can also list all of the
things that could be done. Those would be two different proposals with different budgets and
priorities.
Committee Member Loosbrock asked if there will be education for surrounding residential
properties. If the parks are cleaned up, but the neighbors have buckthorn on their property, it will
just spread back into the park.
Ms. Tucker said there are volunteer events that will be planned and coordinated with Staff. The
timing and potential needs for volunteer events will engage the community to complete positive
actions in the parks. Those next steps are already funded as far as supplies, volunteer time and
advertising. They can have information on hand that outlines the work that has been done, what
still needs to be done and tips on how surrounding residents can help contribute to that work. There
are four more years on the grant funding.
Committee Member Johnson asked what Ms. Tucker would consider the group’s most successful
City project and what is the history.
Ms. Tucker has been with Great River Greening for eight years. She has worked with a variety of
cities and volunteers. She said Great River Greening worked with the City of St. Louis Park to
develop their Natural Resources Management Plan for the Westwood Hills Nature Center. It is an
incredible park. It is invasive species removal in an urban park with native species establishment.
She is looking forward to watching Hazelnut and Floral Parks over the next couple of years. The
initial year at both parks is going really well. They have completely killed much of the buckthorn
and it is not resprouting. This is a great sign. There will be continued maintenance and they
anticipate long-term success.
Committee Member Jacobson asked how St. Louis Park continued their efforts beyond the initial
clean up.
Parks and Recreation Manager Skalicky said larger cities tend to have a dedicated Natural
Resources staff or larger staff in general that can be dedicated to Natural Resources projects and
Natural Resources management.
Committee Member Jacobson said we aren’t a large city. She asked how our small community
move forward with maintaining these efforts.
Ms. Tucker said as a non-profit, they don’t own any of the land they work on. Everything they do
is within the timeframe of the funding they have. When the funding is gone, Great River Greening
has to be complete. The project and the work completed will have to be self-sustainable or
maintainable. She noted that Arden Hills has a Parks and Recreation Manager now. Community
members and Public Works will be tasked with maintaining it once the grant funds run out. Great
River Greening has prioritized the needs. A lot of the maintenance work will be at a low cost. That
is part of the planning from the beginning. They don’t want to have something that can’t be
continued once Great River Greening has moved on. There are a lot of big organizations in the
City and there are potential connections the City can make to help fund and sustain these efforts.
Parks, Trails & Recreation Committee – November 18, 2025 Page 5
Ms. Tucker said she is looking for feedback. The they are trying to build off of the
recommendations so they can move forward with facilitating the projects.
Discussion ensued when this plan would be brought to Council. Staff clarified the difference
between this effort and the Park Master Plan Update that will be heard at the Council meeting in
December. The Great River Greening Natural Resources Management Plan will go to Council
eventually. It is only a draft at this time and a Council presentation has not been scheduled yet.
Ms. Tucker said the grant funding is for a 5 year time period. They started in 2024. Great River
Greening will be working in the community through 2029. Having input on the structure of the
plan is the important piece over the winter. That will allow them to edit and prepare the plan so it
is a useful document for the City, moving forward.
Committee Members will go over the plan, as outlined and provide comments and feedback to
Parks and Recreation Manager Skalicky. She will forward the information to Great River
Greening.
Ms. Tucker said she would like feedback on volunteer interest. Great River Greening facilitates
community engagement through their management work. She would like to learn what the City’s
residents want to see happening and what do community members want to be a part of. They are
incorporating feedback from residents who are working on the current projects. That priority set
and potential will help inform the feasible needs for the physical parks, as well as, the community
members who use the parks.
Committee Member Rogers said there are a lot of community members who would like to be
educated on buckthorn. The City has equipment that can be used, but there are no instructions.
They ended up having to hack out the buckthorn because they couldn’t get the equipment working.
Residents know buckthorn is bad, but that’s all they know. There needs to be a broader
understanding of how to mitigate the invasive species. She asked if the plan will be written so
Public Works and community members will easily understand.
Ms. Tucker said that is a guideline. Section four will contain instruction on the actions being
proposed. Those instruction will be contractor-level and Public Works-level instructions. It will
include lists with useful guidance. The last piece will be more technical soil and impact charts.
The invasive species management protocol will be included. It will outline the actions to be taken
and the timing of those actions.
Committee Member Seemann asked about the woody debris disposal options at Chatham. She
said there is so much the City hasn’t been able to haul it away. They have been chipping it on-site.
She is concerned on how that will effect the establishment of vegetation.
Ms. Tucker said they are working with a contractor on Hazelnut and Floral Parks. One of the
sections were hand-cut, rather than using equipment. The material disposal will include using large
kilns to burn the material at a higher temperature. This process produces less smoke than an open
pile burning, it doesn’t leave any damage to the soil. There will be a demonstration at Floral of
that technique.
Chair Dietz asked if they will share the date of that burning and will the public be allowed to
observe it?
Parks, Trails & Recreation Committee – November 18, 2025 Page 6
Ms. Tucker said it isn’t going to be a publicly advertised demonstration but they would anticipate
City Staff and PTRC Members will be invited. There are certain conditions that must exist to do
that kind of burning. As soon as they know a date, they can share that information with Staff. They
will plan to document it so it can be shared.
Committee Member Loosbrock asked if the woodchips can be spread on trails and at parks.
Ms. Tucker confirmed. There was some tree removal included with the Floral Park work. Some
of that material was left on site to use for maintenance.
B. 2027 Park Improvement Projects – Initial Site Inspections
Parks and Recreation Manager Skalicky shared the presentation slides. She said this is solely a
report on the initial site inspections. There are no approvals attached to any of the observations.
She noted that the streets and parks projects are scheduled on an every other year rotation. Right
now the City is planning for the 2027 parks improvements. The parks to be improved are Perry,
Sampson and Ingerson. The first step is to inspect the parks and identify the issues that we would
like to improve. The power point presentation is not comprehensive. There are three other
attachments that are meant to be more comprehensive than the presentation.
Parks and Recreation Manager Skalicky toured the three parks with Assistant Public Works
Director Miller and Park Lead Christofore. They identified the major needs at each park. She
stressed that there is no guarantee that these improvements will all be completed, but this identifies
where improvements would make sense.
Committee Member Olson said the Park System Plan consultants from Bolten & Menk also
toured the parks. She asked if their findings were incorporated into this.
Parks and Recreation Manager Skalicky said no. They did their site inspection separate from
that project. The hope is that what they present and what we present will say the same thing. The
Perry, Sampson and Ingerson improvements would have been identified and planned, even if the
Park Master Plan were not being completed.
Parks and Recreation Manager Skalicky outlined the work anticipated at Sampson. There are
road signs on a tree. They will be relocated to a post. There is a bend in the trail that weaves around
trees. They would like to see the trail straightened. There is some tree pruning that needs to be
done. Sampson has a lot of tree diversity. The playground structure is due to be replaced.
Discussion ensued regarding concrete ribbing containers and if the parks that were improved this
year got them. Freeway did not and members weren’t sure if Arden Oaks did.
Parks and Recreation Manager Skalicky said the only approved ADA surfaces when building
a playground in 2025 are either pour-in-place which is the rubberized material or engineered wood
fiber (EWF) which is a mulch-like product. Those are the only two options for playground
container materials that are ADA Approved. Most Cities stick with the EWF because the pour-in-
place is roughly ten times as expensive.
Committee Member Olson asked if the playground needs to be ADA approved.
Parks, Trails & Recreation Committee – November 18, 2025 Page 7
Parks and Recreation Manager Skalicky clarified that the playground structure itself may not
be accessible but the container materials must be ADA approved surfaces.
Discussion ensued regarding ADA requirements in different parks and where there may be some
deficiencies.
Parks and Recreation Manager Skalicky said the Sampson basketball hoops will be improved
with metal nets that will help prevent vandalism.
Parks and Recreation Manager Skalicky outlined the needed improvements at Perry Park. There
are some failing boards and some of the supports are rusting at the hockey rink. There is potential
to upgrade the lighting to push-button lights so residents can turn them on when in use. There are
a lot of dead and diseased trees at Perry. There is some fence damage caused by fallen trees. There
are drainage issues, causing pooling in the low spots and effectively creating a puddle in one
portion of the playground container. There is a gully forming in the dog park as well. Grading can
help with these drainage issues. She said there are some retaining walls at the Perry Park Trail that
are failing and some fence upgrades are needed.
Discussion ensued about where the Perry Park Trail turns into the Tony Schmidt Park. There is a
low spot that collects water and bike users of the path are getting splashed when they cross.
Parks and Recreation Manager Skalicky said the land in that location belongs to Ramsey
County. The trail belongs to Arden Hills. The City is responsible for the trail and is aware of that
issue. There is a sewer line that runs under the trail that is scheduled for repairs in 2029. The sewer
line will be repaired and the trail will be redone at the same time. A temporary movable bridge
cannot be used due to winter maintenance.
Committee Member Rogers asked if the liquid on that spot on the trail is just regular water run-
off. It smells funky in that area.
Parks and Recreation Manager Skalicky said it is definitively not sewage. It is swamp water.
Parks and Recreation Manager Skalicky outlined the other Perry Park improvements to include
upgrading the grading and paving around the ball fields. There are bleachers at the dog park that
were in place when it was a ball field. Those bleachers aren’t needed and would be recommend to
be removed. She said the parking lot needs to be redone. There are two trees that are struggling in
a center island because there isn’t enough room for both trees. There is discussion of replacing
them with one tree that could thrive. Dumpster enclosures were recognized as a needed
improvement.
Committee Member Olson thinks we know what is budgeted for these projects. She wonders if
the next step is to put a number on what these improvements would cost and identify what amount
we are short by and prioritize accordingly.
Parks and Recreation Manager Skalicky confirmed. She outlined the Ingerson Park list. She
noted that there is a grove of trees that are declining in the upper right corner of the park. There
are dead and declining trees throughout the park. There are some drainage issues at this park, as
well. There are pocks left behind by removed trees. She would like to see those repaired for safety
Parks, Trails & Recreation Committee – November 18, 2025 Page 8
reasons. The playground is missing a portion of the container due to rot. The benches and the actual
play structure will be upgraded.
Discussion ensued that Ingerson is Arden Hills’ premier sledding location. Any tree plantings will
take that into consideration and will be spread out to avoid the paths sledders would take. Further
discussion ensued that there isn’t enough parking to accommodate all of the people who sled there.
They have floated the idea of removing the grove of diseased trees and putting a parking lot there.
Committee Member Rogers noted the difference between a pavilion and a warming house. Given
how much sledding happens there, she would like to see a warming house to provide more shelter
from the weather.
Parks and Recreation Manager Skalicky said the pavilion is functional but it’s not as modern
looking as other parks’ pavilions. She added a warming house to the list of possible improvements.
Committee Member Olson asked if accessibility is being considered.
Parks and Recreation Manager Skalicky said there are two cul-de-sacs that butt up to the park.
There is a plan for the City to build a trail between the cul-de-sacs. There are discussions of a north
to south trail along Lexington from Ingerson to the park. The trail between the cul-de-sacs will be
a City project. That Lexington trail would be in conjunction with Ramsey County.
Committee Member Olson asked how much got removed for the improvements in 2025. How
can the PTRC help the City realize the importance of adding funds in the budget for these
improvements?
Parks and Recreation Manager Skalicky said being on the PTRC is a good start. She will use
any and all feedback she receives.
Committee Member Olson said PTRC was asked to chime in on Freeway and Arden Oaks Parks
and their feedback was not heard and no additional funding was budgeted for. In the end, the
improvements seem to be the bare minimum. She would like to prevent that from happening again.
She joined this committee to be an advocate for the parks and trails. If there is no funding, there
isn’t much the PTRC can do to help.
Committee Member Julius assumes there are a basic set of needs. There shouldn’t be a park that
doesn’t have swing sets. They are always in use. She is a huge fan of community builds. If the
community can rally to save the City some money, she is sure she could find people to volunteer.
This community wants to contribute.
Committee Member Johnson thought there were a lot of people who responded to a survey
question regarding wanting to help.
Parks and Recreation Manager Skalicky said residents were asked if they would support an
increase in spending on parks projects. She said there was a majority in favor of that.
Parks, Trails & Recreation Committee – November 18, 2025 Page 9
6. REPORTS FROM COMMITTEES
A. Rain Gardens Work Group Updates
None.
B. Natural Habitat Restoration Work Group Update
None.
C. Special Event Enrichment Work Group Update
None.
D. Volunteer Coordinating Work Group Update
None.
E. Trails Work Group Update
None.
6. NEXT MEETING
A. Tuesday, December 16, 2025
ADJOURNMENT
Chair Dietz adjourned at 8:00 pm.
REPORTS – 3C
Page 1 of 3
MEMO.doc
MEMORANDUM
DATE: December 16, 2025
TO: Parks, Trails and Recreation Committee
FROM: Lucas J. Miller, Assistant Public Works Director
SUBJECT: Trail and Parks Projects Update
Previously Discussed Items:
• Hamline Avenue Trail connection with Roseville – Lake Josephine
o Arden Hills staff is coordinating trail improvements with the City of Roseville for
a trail connection along the west side of Lake Josephine with anticipated
construction in 2026.
An open house event took place on May 1, 2025, at Autumn Grove Park
hosted by the City of Roseville. It was well attended and provided great
feedback from the community.
• County Rd E Trail connection
o City staff is coordinating with Ramsey County to construct a new trail segment
along the south side of County Rd E from the Elmer Anderson Trail to Lake
Johanna. This project is postponed and no longer going to be completed in 2026
per Ramsey County. It is being proposed to be combined with the LJB Trail in
2028.
• MN-51 Trail Improvements
o City staff is coordinating with MnDOT to construct a new trail segment along the
west side MN-51 (Snelling Ave.) from Lydia Ave in Roseville to connect to the
existing trail on Old Snelling Ave with anticipated construction in 2026.
o There was an in-person open house that hopefully most of PTRC Members
attended: Thu, Oct. 23, 2025 at Centennial United Methodist Church
• Old Highway 10 Trail, City staff is working with a consultant to pursue grants and state
bonding funds. Estimated project cost is now projected to be $4.5 million.
o Met Council Regional Solicitation – SRTS: $1,000,000 (City was awarded this
grant)
o MnDOT – SRTS: $1,000,000 (City was awarded this grant)
o State GO Bond funds: $1,650,000 (pursuing but stuck at the state level)
o Ramsey County contribution: $1,227,500
o Remainder to be paid through Municipal State Aid and PIR Funds
Council has directed Staff to have the Consultant finish the design documents over
this summer and then bidding the project next winter for construction in 2027 (pushed
back from 2026 to 2027 due to potential cost share policies being updated for trail
project that would benefit the City).
Page 2 of 3
• Proposed Lake Johanna Blvd Trail
o Lake Johanna Blvd Trail Preliminary Design Report was completed by Ramsey
County in October 2022.
o City Council adopted resolution 2023-023 which is the local match commitment
of $2 million for the project (Total project cost estimated $9.5 million).
o Ramsey County presented in November 2023 about the project corridor with City
Council.
o Ramsey County applied for the Met Council Regional Solicitation “Multiuse
Trails and Bicycle Facilities” grant for $5,500,000 in 2023/2024. The project did
not score well in its category but funding is still being pursued.
o Within Ramsey County’s Transportation Improvement Plan they have scheduled
the following timeline:
Ramsey County presented information to Council in September which
stated they are budgeting for the project to be completed in three different
sections of the trail along Lake Johanna Blvd. over three separate years.
RFP for Planning/Design contract: 2026
Planning/Design Phase: staggered 2026, 2027 and 2028
Construction: 2029 for the west segment, 2030 for the east segment and
2031 for the middle segment.
• Council has negotiated with a private developer as part of the PUD for the site for a trail
to be added along the west side of Snelling Ave from Highway 96 all the way down to
Royal Hills Park. This work is likely to take place in 2026 if everything falls into place.
This trail will be owned and maintained by the City once completed. Currently, the
Developer is going through the Permitting Phase, and after that is completed, the City
will start the Design phase for the trail with a consulting firm.
• Arden Manor Park Hardcourt Construction – City staff has applied for the DNR Outdoor
Recreation Grant Program to pursue funding for this project. The project was not
awarded any funding. Council direction is to continue to pursue grant funding to fund the
project. Staff reached out to CDBG representatives requesting the status of the program
for 2025 which they responded that the CDBG Solicitation is postponed until a federal
budget is passed.
• Staff will be working with a consultant to implement Hardcourt Improvements within
Hazelnut Park.
• Hazelnut Parking Lot Status Update: Cost-share and maintenance responsibility
negotiations continue with the Church representatives. The City has the parking lot
resurfacing project budgeted for construction in 2026. Actual timing is dependent on
Agreement renewal.
New/Updated Items:
• County Rd D Trail connection
o The City of Roseville is coordinating with Ramsey County to construct a new
trail segment along the south side of County Rd D from Cleveland Ave to
Lake Johanna Blvd with anticipated construction in 2027.
• The 2025 Parks Project (Arden Oaks Park & Freeway Park), are substantially
completed except:
Page 3 of 3
o Final restoration at both parks in green space will need final approval in the
spring 2026 for warranty work and seed establishment.
o The City has requested the contractor add some extra draintile to the
scope at Freeway Park in some low spots to promote drainage. This work
has been completed and will be assessed in the spring of 2026.
• The 2027 Parks Project (Ingerson, Perry and Sampson):
o This may include a potential trail connection at the cul-de-sac of
Fernwood Ct to the bottom of hill at Ingerson Park, if budget allows
o Preliminary site conditions have been assessed and brought to PTRC at
the last monthly meeting in November. The items are being compiled by
Staff and will be brought to a Council Work Session in February or
March to get direction.
NEW BUSINESS – 5A
MEMORANDUM
DATE: December 16, 2025
TO: Parks, Trails and Recreation Committee
FROM: Jess Skalicky, Parks and Recreation Manager
SUBJECT: Park System Plan Update
Requested Action
Informational presentation: no action required
Background
Staff will give an overview of the Park System Plan Update presentation that was recently given
to City Council.
Attachment
Attachment A: Park System Plan Update Power Point
PARK SYSTEM PLAN
CITY COUNCIL UPDATE
City of Arden Hills
DECEMBER 8, 2025
ARDEN HILLS CITY HALL
Arden Hills Park System Plan | City Council December Workshop
01. Planning Process (5 mins)
• General Overview
• Schedule
02. Public Engagement (10 mins)
• Pop-Up Events
• Community Open House
• Steering Committee Meetings
03. Key Preliminary Recommendations
(10 mins)
• Recreation Facilities
• Playgrounds
• Water Access
• Park Amenities
• Operations + Maintenance
04. Next Steps + Questions (5+ mins)
Agenda
Arden Hills Park System Plan | City Council December Workshop
PLANNING PROCESS
+ SCHEDULE
Arden Hills Park System Plan | City Council December Workshop
What is a park system plan?
A park system plan is a policy document that helps guide future
decision-making for a community’s network of parks, trails,
and open spaces. It includes recommendations based on public
engagement findings and a needs assessment process, and aims to
identify and align resources to effectively make improvements over
the next 10 years.
Source: The Trust for Public Land www.tpl.org/parks-promote-health-report
Why are parks, trails, and recreation
systems so important?
Parks and Green Spaces Increase Physical Activity
Increased physical activity is associated with reduced obesity, reduced
osteoporosis, lower blood pressure, enhanced child development, and improved
mental health.
Contact with Nature Promotes Mental and Physical Health
Benefits include lower blood pressure, improved birth outcomes, reduced
cardiovascular risk, less anxiety and depression, better mental concentration,
healthier child development, enhanced sleep quality, and more.
Parks Strengthen Social Connections that are Positive for Health
Park access bolsters social connections and brings people together. Even
informal encounters in a playground or walking on paths can yield gratifying
social contacts. People commonly have social gatherings in parks and make
new friends there.
Parks Improve Environmental Health and Climate Resilience
Parks provide cooling benefits to neighborhoods within a 10-minute walk, can
reduce flooding of streets and homes, and filter air pollutants.
Process + Schedule
Steering Committee Meeting (4)
City Staff Coordination Meeting (14)
PTRC Meeting
Public Engagement Event (5)
City Council Meeting
2025 2026
M J J A S O N D J F M A
Project Kick-Off + Regular Staff Meetings (14)
Existing Condition Inventory + Analysis
Base Mapping
Previous Plan Audit
Field Inventory + Review of Existing Facilities
Review of Park + Recreation Programs
Demographics, Trends + National Metrics
Analysis
Steering Committee Meeting #1
PTRC #1
Project Website Launch
Public Engagement
Community Survey
Pop-Up Engagement #1
Enhanced Project + Survey Marketing
Pop-Up Event #2
Project Open House
Steering Committee Meeting #2
Community Needs Assessment
Community Needs Evaluation
Park + Trail Classifications
Draft Goals, Policies + Initiatives
Steering Committee Meeting #3
Implementation Planning
Project Cost Estimating
Prioritized 10-Year CIP
Funding + Implementation Plan
Steering Committee Meeting #4
PTRC #2
City Council Work Session vv
Final Plan Preparation + Adoption
Draft Plan Preparation + Review
Final Plan Preparation
PTRC Approval and Recommendation
City Council Approval
Touch a Truck Event (05/17)Touch a Truck Event (05/17)
Community Picnic (08/14) Community Picnic (08/14)
Steering Committee Meeting #2 (08/12) Steering Committee Meeting #2 (08/12)
Steering Committee Meeting #3 Steering Committee Meeting #3
Steering Committee Meeting #4 Steering Committee Meeting #4
City Council Work Session December 8 City Council Work Session December 8
City Council Meeting City Council Meeting
Community Survey (Online June 16 to August 18)Community Survey (Online June 16 to August 18)
WE ARE HEREWE ARE HERE
Open House at City Hall (6-8pm Nov 4th) Open House at City Hall (6-8pm Nov 4th)
07/15 07/15
06/1306/13
02/17 02/17
03/17 03/17
Arden Hills Park System Plan | City Council December Workshop
Project Goals
Maximize opportunities for
input from as many different
voices as possible, and bring
the community together
Develop a plan that provides
clear guidance for future
decision-making
Prepare a quality document
that educates and informs
constituents, staff, and elected
officials about the costs and
benefits of parks, trails, and
recreation
Develop a plan that is
community-driven and reflects
the real desires of residents
Develop a plan that is visionary
and attainable
Arden Hills Park System Plan | City Council December Workshop
PUBLIC ENGAGEMENT
Arden Hills Park System Plan | City Council December Workshop
Public Engagement Event Schedule
M J J A S O N D J F M A
Project Website
Community Survey
Pop-Up Engagement #1
Enhanced Project + Survey Marketing
Pop-Up Event #2
Project Open House
Touch a Truck Event (05/17)Touch a Truck Event (05/17)
Community Picnic (08/14) Community Picnic (08/14)
Community Survey (Online June 16 to August 18)Community Survey (Online June 16 to August 18)
Open House at City Hall (6-8pm Nov 4th) Open House at City Hall (6-8pm Nov 4th)
Project Yard SignProject Yard Sign Project Trail DecalProject Trail Decal
Arden Hills Park System Plan | City Council December Workshop
Public Engagement Touch-A-Truck Pop-Up
Perry Park
Saturday, May 17
10am to 1pm
Approximately 30 people
interacted with the booth.
Key comments included:
• Interest in more dog parks
• Desire for a Johanna connection trail, from Tony
Schmidt Park to the east side of Lake Johanna
• Many would like to see year-round shelters (like
the four-seasons shelters in Roseville parks)
• A resident would like to see the trail on
the southwest side of Tony Schmidt Park
constructed, saying, “It’s been a dashed line on a
map for years, just like on your map.”
• Conversations about park amenities in general
and specific gaps in the trail network rather
than specific parks
Arden Hills Park System Plan | City Council December Workshop
Public Engagement Touch-A-Truck Pop-Up
Arden Hills Park System Plan | City Council December Workshop
Public Engagement Touch-A-Truck Pop-Up
Kids Teens Adults Seniors TOTALS
Basketball Courts 1 ---1
Dual Pickleball/Tennis Courts --2 2 4
Multi-Use Sports Fields --3 -3
Outdoor Fitness Equipment 1 -4 -5
Softball + Baseball Fields 4 -3 1 8
Trails 5 -14 5 24
Gathering/Hang-Out Spots 6 1 2 1 10
Natural Spaces to Explore 2 -10 2 14
Nature Playground Areas 9 1 13 2 25
Picnic Shelters 1 -4 -5
Playful Public Art 6 1 --7
Water Features 13 1 14 5 33
Accessible Playground Areas 3 1 6 4 14
Benches/Seating Options 1 -3 1 5
Crosswalks 3 -5 -8
Educational Signage -1 1 -2
Pedestrian Lighting --6 2 8
Shade Structures 9 1 1 2 13 Bottom 3 desired amenity
Top 3 desired amenity
Arden Hills Park System Plan | City Council December Workshop
Public Engagement The Online Survey
How often do you spendHow often do you spend
time in Arden Hills parks?time in Arden Hills parks?
Most desired amenitiesMost desired amenities
to addto add
1
6
2
7
3
8
Paved
Trails
Drinking
Fountains
Pickleball
Courts
Splash Pad Nature Play Trail
Lighting
Social /
Hang Out
Spaces
Large
Rentable
Picnic
Pavilion
Shade
Structures
Unpaved
Trails 4
9
5
10
SurveySurvey
RespondentsRespondents
874 2,721
Total Responses
Comment Responses
to Survey Questions
Age rangeAge range
of respondentsof respondents
Younger than 20 years old
31-45 years old
46-60 years old
61 + years old
18-30 years old
3.16%
7.3%
26.30%
24.65%
38.56%
Several times
a week
Daily
Once a week
A few times a month
Once Monthly
A few times a year
Once Annually
Never
800 survey respondents answered
YES! NO.
Would you support additional spending Would you support additional spending
to improve trail connections between to improve trail connections between
neighborhoods and parks? neighborhoods and parks?
3 KEY TAKEAWAYS3 KEY TAKEAWAYS
1. Strong Demand for Trail
Connectivity and Safety
2. Desire for Modern Amenities and
Inclusive Features
3. Maintain Natural Character While
Improving Maintenance
43%24%
11%
11%5%3%1%.6%80%
808 survey respondents answered
An increase in spending
Maintain spending levels
A decrease in spending
When it comes to the city investing in Arden When it comes to the city investing in Arden
Hills’ parks, trails, and open spaces, which of Hills’ parks, trails, and open spaces, which of
the following do you support?the following do you support?
62%
34%
4%
20%
How important are Arden How important are Arden
Hills Parks, trails, and open Hills Parks, trails, and open
spaces to you and your spaces to you and your
family?family?
86%12%
1%
Very Important Important
Indifferent
1%Not Important
Top winter activities toTop winter activities to
add, improve, or expand onadd, improve, or expand on
6th
Winter Biking
4th
Cross-country skiing
1st
Walking/hiking
5th2nd
SnowshoeingSledding
3rd
Ice Skating
Arden Hills Park System Plan | City Council December Workshop
Public Engagement Community Picnic
Cummings Park
Thursday, August 14
5:00 - 7:30 PM
Approximately 50 people interacted
with the booth.
Key comments included:
• Trails and trail facilities are lacking in the northern
portion of the city (TCAAP site)
• Some of the city’s hockey rinks are not in great
condition
• Need more playgrounds for wider variety of ages -
very young and older kids especially
• Make big destination park in TCAAP area if possible
• Parks need to be more accessible both physically
and visually
Arden Hills Park System Plan | City Council December Workshop
Public Engagement Community Picnic
Arden Hills Park System Plan | City Council December Workshop
Public Engagement Community Picnic
TOTALS
Better Connectivity + Accessibility 12
Flex/Multi-Use Fields + Sport Courts 5
Enhanced Playground + Play Features 17
Preservation of + Access to the Natural
Environment 9
Additional Programs. Events + Activities for All Ages 11
Other:
• Additional biking trails
• Natural resources management: give more
funds/resources for native species, diseased
trees, etc.
3
Top 3 priorities
Arden Hills Park System Plan | City Council December Workshop
Public Engagement Community Open House
City Hall
Tuesday, November 4
6 - 8 PM
Approximately 50 people attended.
Key comments and conversations
included:
• Desire to see northern portion of Freeway Park
updated
• Desire for more access to cross-country skiing and
mountain biking
• Interest in increased management of invasive
species and tree replacement as Emerald Ash Borer
continues to kill trees across the city
• Making trail and connectivity improvements should
be a high priority
Arden Hills Park System Plan | City Council December Workshop
Public Engagement Community Open House
Arden Hills Park System Plan | City Council December Workshop
Steering Committee Meetings
Meeting #1 : June 13th Kickoff Meeting
• Introductions, review of project goals, process, and schedule
• Review of online survey draft
• Review of Touch a Truck engagement event
• Next Steps
Meeting #2 : August 12th
• Update members on project progress, including online survey status and draft analysis maps
• SWOT analysis exercise to get insight on the current system’s strengths, weaknesses, opportunities, and threats
Meeting #3 : November 17th
• Review of Needs Assessment Summary, including park and trail system metrics and data and community
engagement findings
• Next steps: prioritization exercise of draft recommendations
Meeting #4 : Early February
• Review draft plan (including recommendations and findings from prioritization exercise)
Arden Hills Park System Plan | City Council December Workshop
KEY PRELIMINARY
RECOMMENDATIONS
Arden Hills Park System Plan | City Council December Workshop
Recreation Facilities
1. Add single track mountain bike trails.
2. Update aging existing facilities and amenities, including:
a. Hockey Rink Boards at Perry Park and Freeway Park.
b. Ballfields at Perry Park.
c. Basketball courts at Sampson and Cummings Parks.
d. Replace the tennis/pickleball court at Hazelnut Park.
3. Remove the ballfield at Floral Park, maintaining the
open lawn space for flexible use.
4. Look to add a bank of 4 to 6 dedicated pickleball courts
in a future park.
5. Look for opportunities to add cross country ski trails in a
future park.
Arden Hills Park System Plan | City Council December Workshop
Playgrounds
Water Access
1. Replace the playgrounds at Sampson and Ingerson
Parks.
2. Work to provide a variety of play features and
equipment styles when updating play equipment.
3. Provide a universal playground designed for people of all
ages and abilities.
4. Add a nature play area.
1. Add a splash pad or water plaza to a future or existing
community park.
2. Provide a boardwalk experience at Johanna Marsh Park.
3. Provide access to Round Lake by adding a fishing pier
and kayak launch at South Shore Park.
Arden Hills Park System Plan | City Council December Workshop
Park Amenities
1. Ensure all community parks have permanent restrooms, drinking
fountains, and off- street parking
a. Add permanent restrooms to Floral and Hazelnut Parks.
b. Add drinking fountains to Floral, Cummings, Perry, and Hazelnut
Parks.
c. Add off street parking to Floral Park.
2. Add paved loop or access trails to Arden Oaks, Freeway, Ingerson, and
Royal Hills Parks.
3. Update the shelters at Ingerson and Freeway Park.
4. Beautify park entry experiences by formalizing parking areas, adding
vegetation and park entry signs as needed at Freeway and Sampson
Parks.
5. Look for opportunities to incorporate public art into parks.
6. Improve access to parks by adding wayfinding / directional signage to
parks that are not located on main roadways, including South Shore
Fitness Park, Cummings, Arden Hills Community Garden, and Floral
Park.
Arden Hills Park System Plan | City Council December Workshop
Operations + Maintenance
1. Improve access to permanent restrooms by unlocking them during
park hours from May to October.
2. Plow paved trails in winter.
3. Convert hard-to-maintain, underutilized grass areas to areas with
native plantings.
4. Identify and manage areas with invasive species.
5. When updating neighborhood parks, develop mini-master plans and
engage the community on their redesign to get resident input on
elements such as playgrounds, circulation, and amenities.
25
Trails + ConnectivityTrails + ConnectivityDRAFT
Arden Hills Park System Plan | City Council December Workshop
NEXT
STEPS
Arden Oaks Park Analysis + Investment Plan
ASSET CONDITION REPLACEMENT
TIMELINE
REPLACEMENT
YEAR
REPLACEMENT
COST*
Bench
Poor - Worn from use.
Nearing the end of
expected life cycle
1-3 Years 2026 $2,000
Park
Entrance
Sign
Fair - Average wear for
age. Not new but no
immediate issues.
1-3 Years 2026 $5,000
Basket Ball
Hoop
Excellent - Brand new
and no issues to report 10-20 Years 2040 $7,000
Basket Ball
Hoop
Excellent - Brand new
and no issues to report 10-20 Years 2040 $7,000
Basketball
Full Court
Basketball
/ Pickleball
Court
Excellent - Brand new
and no issues to report 20+ Years 2049 $50,000
Playground Excellent - Brand new
and no issues to report 20+ Years 2049 $300,000
Swings Excellent - Brand new
and no issues to report 20+ Years 2049 $25,000
2026 REPLACEMENT COST $7,000
2040 REPLACEMENT COST $14,000
2049 REPLACEMENT COST $310,000
Arden Hills Park System Plan | City Council December Workshop
1. Refine Preliminary
Recommendations
2. Develop Implementation Plan
3. Steering Committee Review
of Draft Plan (February)
4. PTRC Plan Review + Approval
(March)
5. Council Approval (April)
Next Steps
*Costs in 2026 dollars and not adjusted for inflation
DRAFT