HomeMy WebLinkAbout07-08-2026 PC PacketAPPROVAL OF THE AGENDA
APPROVAL OF MINUTES
Draft 06 -03 -26 Planning Commission Meeting Minutes
DRAFT 06 -03 -26 PC MINUTES.PDF
PLANNING CASES
Planning Case 26 -013 –EFH Co. –1300 Grey Fox Road –Site Plan Review And
Conditional Use Permit
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
ATTACHMENT F.PDF
ATTACHMENT G.PDF
Planning Case 26 -009 –Roers Companies LLC –3499 Lexington Avenue –
Comprehensive Plan Amendment, Zoning Code Amendment, Master And Final
Planned Unit Development, Conditional Use Permit, Site Plan Review, And
Variance
PC 26 -009 PC MEMO -REVISED.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
ATTACHMENT F.PDF
ATTACHMENT G.PDF
ATTACHMENT H.PDF
ATTACHMENT I.PDF
ATTACHMENT J.PDF
ATTACHMENT K.PDF
ATTACHMENT L.PDF
Planning Case 26 -017 –Ryan Companies –Ordinance Amendments To Chapter
13 -Zoning Code Section 1380 TCAAP Redevelopment Code For Clear Height And
Loading Dock Requirements
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
Planning Case 26 -018 –City Of Arden Hills –Ordinance Amendment To Chapter
13 –Zoning Code Section 1320.16 Requirements For Affordable Housing
MEMO.PDF
ATTACHMENT A.PDF
UNFINISHED AND NEW BUSINESS
Planning Case 26 -011 -City Of Arden Hills –Ordinance Amendments To Chapter
13 –Zoning Code Section 1325 Adding Language For Accessory Dwelling Units
MEMO.PDF
COMMENTS AND REPORTS
Report From The City Council
Planning Commission Comments
Staff Comments
ADJOURNMENT
ADJOURN
A quorum of the City Council may be
present at this meeting.
Chair:
Joshua Collins
(2027)
Commissioners:
Brad Bjorklund
(2025)
Steve Erler (2026)
Ben Lindau, Vice
Chair (2026)
Patrick Burlingame
(2027)
Nancy Jacobson
(2027)
Jessica Birken
(2027)
Katie Stromberg -
Alternate (2026)
SJ Julius -Alternate
(2027)
Council Liaison:
Kurt Weber
Planning Commission
July 8, 2026
6:30 p.m.
City Hall
Address:
1245 W Highway 96
Arden Hills MN 55112
Phone:
651 -792 -7800
Website :
www.cityofardenhills.org
City Vision
Arden Hills is a strong community that values its unique environmental setting,
strong residential neighborhoods, vital business community, well -maintained
infrastructure, fiscal soundness, and our long -standing tradition as a desirable
City in which to live, work, and play.
Members of the public may attend a meeting in -person at City Hall or they may
view the meeting remotely on the City ’s website using the below link. Meetings are
also broadcast on Cable Channel 16 for those that live in Arden Hills.
https://cityofardenhills.org/320/Watch -City -Meetings
Some Commissioners may be participating in this meeting by interactive
technology/remotely.
Agenda
CALL TO ORDER
1.
2.
2.A.
Documents:
3.
3.A.
Documents:
3.B.
Documents:
3.C.
Documents:
3.D.
Documents:
4.
4.A.
Documents:
5.
5.A.
5.B.
5.C.
6.
APPROVAL OF THE AGENDAAPPROVAL OF MINUTESDraft 06 -03 -26 Planning Commission Meeting MinutesDRAFT 06 -03 -26 PC MINUTES.PDF
PLANNING CASES
Planning Case 26 -013 –EFH Co. –1300 Grey Fox Road –Site Plan Review And
Conditional Use Permit
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
ATTACHMENT F.PDF
ATTACHMENT G.PDF
Planning Case 26 -009 –Roers Companies LLC –3499 Lexington Avenue –
Comprehensive Plan Amendment, Zoning Code Amendment, Master And Final
Planned Unit Development, Conditional Use Permit, Site Plan Review, And
Variance
PC 26 -009 PC MEMO -REVISED.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
ATTACHMENT E.PDF
ATTACHMENT F.PDF
ATTACHMENT G.PDF
ATTACHMENT H.PDF
ATTACHMENT I.PDF
ATTACHMENT J.PDF
ATTACHMENT K.PDF
ATTACHMENT L.PDF
Planning Case 26 -017 –Ryan Companies –Ordinance Amendments To Chapter
13 -Zoning Code Section 1380 TCAAP Redevelopment Code For Clear Height And
Loading Dock Requirements
MEMO.PDF
ATTACHMENT A.PDF
ATTACHMENT B.PDF
ATTACHMENT C.PDF
ATTACHMENT D.PDF
Planning Case 26 -018 –City Of Arden Hills –Ordinance Amendment To Chapter
13 –Zoning Code Section 1320.16 Requirements For Affordable Housing
MEMO.PDF
ATTACHMENT A.PDF
UNFINISHED AND NEW BUSINESS
Planning Case 26 -011 -City Of Arden Hills –Ordinance Amendments To Chapter
13 –Zoning Code Section 1325 Adding Language For Accessory Dwelling Units
MEMO.PDF
COMMENTS AND REPORTS
Report From The City Council
Planning Commission Comments
Staff Comments
ADJOURNMENT
ADJOURN
A quorum of the City Council may be
present at this meeting.
Chair:Joshua Collins (2027)Commissioners:Brad Bjorklund (2025)Steve Erler (2026)Ben Lindau, Vice Chair (2026)Patrick Burlingame (2027)Nancy Jacobson (2027)Jessica Birken (2027)Katie Stromberg -Alternate (2026)SJ Julius -Alternate (2027)Council Liaison:Kurt Weber Planning Commission July 8, 2026 6:30 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.org City VisionArden Hills is a strong community that values its unique environmental setting,strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirableCity in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsSome Commissioners may be participating in this meeting by interactive technology/remotely.AgendaCALL TO ORDER1.2.2.A.Documents:
3.
3.A.
Documents:
3.B.
Documents:
3.C.
Documents:
3.D.
Documents:
4.
4.A.
Documents:
5.
5.A.
5.B.
5.C.
6.
APPROVAL OF THE AGENDAAPPROVAL OF MINUTESDraft 06 -03 -26 Planning Commission Meeting MinutesDRAFT 06 -03 -26 PC MINUTES.PDFPLANNING CASESPlanning Case 26 -013 –EFH Co. –1300 Grey Fox Road –Site Plan Review And Conditional Use PermitMEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFATTACHMENT E.PDFATTACHMENT F.PDFATTACHMENT G.PDFPlanning Case 26 -009 –Roers Companies LLC –3499 Lexington Avenue –Comprehensive Plan Amendment, Zoning Code Amendment, Master And Final Planned Unit Development, Conditional Use Permit, Site Plan Review, And Variance PC 26 -009 PC MEMO -REVISED.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFATTACHMENT E.PDFATTACHMENT F.PDFATTACHMENT G.PDFATTACHMENT H.PDFATTACHMENT I.PDFATTACHMENT J.PDFATTACHMENT K.PDFATTACHMENT L.PDFPlanning Case 26 -017 –Ryan Companies –Ordinance Amendments To Chapter 13 -Zoning Code Section 1380 TCAAP Redevelopment Code For Clear Height And Loading Dock Requirements MEMO.PDFATTACHMENT A.PDFATTACHMENT B.PDFATTACHMENT C.PDFATTACHMENT D.PDFPlanning Case 26 -018 –City Of Arden Hills –Ordinance Amendment To Chapter 13 –Zoning Code Section 1320.16 Requirements For Affordable HousingMEMO.PDFATTACHMENT A.PDF
UNFINISHED AND NEW BUSINESS
Planning Case 26 -011 -City Of Arden Hills –Ordinance Amendments To Chapter
13 –Zoning Code Section 1325 Adding Language For Accessory Dwelling Units
MEMO.PDF
COMMENTS AND REPORTS
Report From The City Council
Planning Commission Comments
Staff Comments
ADJOURNMENT
ADJOURN
A quorum of the City Council may be
present at this meeting.
Chair:Joshua Collins (2027)Commissioners:Brad Bjorklund (2025)Steve Erler (2026)Ben Lindau, Vice Chair (2026)Patrick Burlingame (2027)Nancy Jacobson (2027)Jessica Birken (2027)Katie Stromberg -Alternate (2026)SJ Julius -Alternate (2027)Council Liaison:Kurt Weber Planning Commission July 8, 2026 6:30 p.m. City Hall Address:1245 W Highway 96Arden Hills MN 55112Phone:651 -792 -7800Website:www.cityofardenhills.org City VisionArden Hills is a strong community that values its unique environmental setting,strong residential neighborhoods, vital business community, well -maintained infrastructure, fiscal soundness, and our long -standing tradition as a desirableCity in which to live, work, and play.Members of the public may attend a meeting in -person at City Hall or they may view the meeting remotely on the City ’s website using the below link. Meetings are also broadcast on Cable Channel 16 for those that live in Arden Hills.https://cityofardenhills.org/320/Watch -City -MeetingsSome Commissioners may be participating in this meeting by interactive technology/remotely.AgendaCALL TO ORDER1.2.2.A.Documents:3.3.A.Documents:3.B.Documents:3.C.Documents:3.D.Documents:
4.
4.A.
Documents:
5.
5.A.
5.B.
5.C.
6.
Approved: July 8, 2026
CITY OF ARDEN HILLS, MINNESOTA
PLANNING COMMISSION
WEDNESDAY, JUNE 3, 2026
6:30 P.M. - ARDEN HILLS CITY HALL
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Chair Collins called to order the regular Planning
Commission meeting at 6:30 p.m.
ROLL CALL
Present were: Chair Joshua Collins, Commissioners Jessica Birken, Brad Bjorklund, Patrick
Burlingame, Stephen Erler, Nancy Jacobson and Ben Lindau.
Absent: None.
Also present were: Community Development Director Jacob Reilly, Senior Planner Elena
Fransen and Council Liaison Kurt Weber.
APPROVAL OF AGENDA – JUNE 3, 2026
Commissioner Erler moved, seconded by Commissioner Birken, to approve the June 3,
2026, agenda as presented. The motion carried unanimously (7-0).
APPROVAL OF MINUTES
April 8, 2026 – Planning Commission Regular Meeting
Senior Planner Fransen reported there were updates made to the minutes on Page 4 and 5 to
correct the spellings of names.
Commissioner Erler moved, seconded by Commissioner Birken, to approve the April 8,
2026, Planning Commission Regular Meeting as amended. The motion carried
unanimously (7-0).
PLANNING CASES
A. Planning Case 26-012 – 3336 Lake Johanna Boulevard – Variance – No Public
Hearing Required
Senior Planner Fransen explained that Mill City Design Build (“The Applicant”), on behalf of
the property owners, has requested a variance from the floor area ratio (FAR) requirement in the
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 2
R-2 Zoning District to build a 384 square foot porch addition to the existing principal dwelling at
3336 Lake Johanna Boulevard (“Subject Property”). To construct the proposed porch, the
Applicant is requesting a FAR of 0.336. City code establishes a maximum FAR of 0.3.
Senior Planner Fransen stated the Subject Property lot area is 9,215 square feet as measured
from the front and side property lines to the ordinary high water level. Minnesota State Statute
6120.3300 requires only land above the ordinary high water level to be used to meet lot area
standards. The maximum gross floor area of the principal dwelling on the lot is 2,765 square
feet, for a maximum FAR of 0.3. The existing principal dwelling is 2,718 square feet in area.
Senior Planner Fransen reported the Subject Property was originally developed in 1913 with an
addition constructed in 1987. The detached garage on the property was reconstructed in 2004.
The detached garage required a variance from the front yard setback, the side yard setback for
accessory structures, and the requirement that no accessory structure shall be nearer the front lot
line than what is the required front setback. The City Council approved the variance requests in
Planning Case 03-22. The Subject Property is a riparian lot with frontage on Lake Johanna,
which is defined by the Minnesota Department of Natural Resources as a General Development
Lake. The property is subject to the Shoreland Regulations in the City’s Zoning Code
Senior Planner Fransen reviewed the Site Data, the Plan Evaluation and provided the Findings
of Fact for review:
General Findings:
1. Mike and Katie Shepard are the owners of the property at 3336 Lake Johanna Boulevard,
Arden Hills, MN.
2. Mill City Design Build, on behalf of the property owners submitted a land use application
for a variance to construct a porch addition at the Subject Property 3336 Lake Johanna
Boulevard.
3. The proposal would vary from the maximum floor area ratio (0.3) permitted in the R-2
Zoning District in that the proposed new porch expands the footprint of the existing
dwelling and increases the floor area ratio to 0.336.
4. The Subject Property is a riparian lot with frontage on Lake Johanna and is subject to
Shoreland Regulations.
5. The proposed addition would be set back 52.7 feet from Ordinary High Water Level and
would be located outside of the required structure setback of 50 feet and will not be
nearer to OHWL than the nearest adjacent structure.
6. The Applicant submitted the required shoreland mitigation plan for the proposed
addition.
7. The proposed addition to the Subject Property would conform to all other requirements
and standards of the R-2 Zoning District and the Shoreland Regulations.
Variance Findings:
8. Variances are only permitted when they are in harmony with the general purposes and
intent of the ordinance and when consistent with the comprehensive plan.
9. Variances may be granted when the applicant for the variance establishes that there are
practical difficulties in complying with the zoning ordinance.
10. The requested variance is in harmony with the purposes and intent of the ordinance
because a porch is a common feature of a single-family dwelling use.
11. The requested variance is consistent with the comprehensive plan goal of maintaining a
strong, vital diverse, and stable housing supply, uses site sensitive planning and design to
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 3
protect the significant natural feature – Lake Johanna – abutting the property, and
remains a residential use as shown on the Future Land Use map.
12. The property owner proposes to use the property in a reasonable manner because a porch
addition is a common amenity within residential zoning districts.
13. There are unique circumstances to the property not created by the landowner due to the
unique grading and drainage issues posed by a shoreland property.
14. The variance will not alter the essential character of the neighborhood because the
proposed porch will be incorporated into the profile of the existing dwelling and will
have limited impacts to view from Lake Johanna and adjacent properties.
Senior Planner Fransen reviewed the options available to the Planning Commission for
Planning Case 26-012 for a variance to allow the property owner to construct a porch addition
resulting in a floor area ratio of 0.336 and deviate from the 0.3 FAR standard at 3336 Lake
Johanna Boulevard:
1. Recommend Approval with Conditions
1. A Building Permit shall be issued prior to the commencement of construction.
2. The proposed building addition shall conform to all other standards and regulations in the
City Code.
3. A Grading and Erosion permit shall be obtained from the City’s PW/Engineering
Division prior to commencing any grading, land disturbance or utility activities.
4. Final grading, drainage, and site plans shall be subject to approval by the Public Works
Director/City Engineer and Community Development Director prior to the issuance of a
grading and erosion control permit or other development permits.
5. The Applicant shall be responsible for obtaining any permits necessary from other
agencies, including but not limited to, RCWD and DNR, prior to the start of any site
activities.
6. The submitted shoreland mitigation plans shall be completed in accordance with City
Code Section 1330.03 Subd. 7. E. within one year of the plan's approval unless otherwise
approved by the City.
2. Recommend Approval as Submitted
3. Recommend Denial
4. Table
Chair Collins opened the floor to Commissioner comments.
Commissioner Burlingame asked if the applicant was aware of the fact this addition would
bring the structure coverage to the hard maximum of 25% and any future additions would require
another variance.
Senior Planner Fransen stated the applicant was aware of this requirement and this information
would be included in the building permit approval.
Chair Collins requested further information regarding the distinction between floor area ratio
(FAR) and structure coverage.
Senior Planner Fransen explained FAR was the sum of the horizontal area of all floors of the
building measured from the exterior faces of the exterior walls and does not include garages,
decks, covered front porches or spaces that do not meet minimum height requirements. She
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 4
reported the structure coverage for this property would be expanded through the deck addition
and expansions to the dwelling footprint.
Commissioner Bjorklund asked what the side yard setbacks were in the R-1 and R-2 zoning
districts.
Senior Planner Fransen indicated the minimum side yard setback in the R-1 zoning district was
10 feet and the combined total can be no less than 25 feet. She reported the minimum side yard
setback in the R-2 zoning district was 5 feet and the combined total can be no less than 15 feet.
Commissioner Bjorklund commented on the number of variances this property already has, in
his opinion, noting the lot size is too small, suggesting the FAR change adds even more
variances.
Chair Collins explained the only requested variance at this time was for the FAR. He reported
the property itself does not conform to many items within the R-2 or shoreland ordinances. He
indicated this meant the lot was non-conforming and not that the property has received
additional variances.
Commissioner Bjorklund stated the garage was not in conformance with City standards. He
indicated the garage was not currently meeting the front yard or side yard setbacks. He was of
the opinion this property required four variances.
Chair Collins explained there were numerous properties in Arden Hills that were not in
conformance with the City’s zoning code. He indicated the Commission was being asked to
consider a variance for FAR at this time.
Commissioner Bjorklund stated this may be the case, but noted this property had six or seven
non-conformities already. He further discussed how this lot did not meet the lot area minimum or
proper lot width at the building line for riparian lots in the Shoreland District. He discussed how
this property probably had a cottage on it at one time and the property owner has continued to
expand the building over time while the lot remains in non-conformance. He stated approval of
the proposed variance would make this lot even more non-conforming.
Senior Planner Fransen reported a variance was granted for the garage.
Commissioner Jacobson thanked staff for the detailed presentation on this request. She
commented on the City’s FAR and questioned how Arden Hills’ regulations compared to
neighboring cities.
Senior Planner Fransen indicated the City’s FAR has become more restrictive over time, but
has generally been used to manage density and how structures are massed on a property.
Commissioner Bjorklund discussed how this neighborhood had changed over time. He
commented on how there was pressure to build bigger and bigger homes on lakeshore properties.
He stated the building area for the lots on this lake was becoming quite congested.
Commissioner Jacobson explained she lived on a non-conforming lot in a non-conforming
house. She indicated she appreciated how the applicant was proposing to alter their property and
believed the three season porch and deck were a good use of the space.
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 5
Chair Collins reported the structure coverage for this property would remain at 25%. He
understood the visual congestion that was occurring on the lake but noted this was just progress.
Commissioner Lindau commented he believed the three season porch and deck expansion were
reasonable requests. He stated some communities don’t count porch space against as floor area.
Commissioner Lindau moved a motion to recommend approval as submitted of Planning
Case 26-012 for a variance to allow the property owner to construct a porch addition
resulting in a floor area ratio of 0.336 and deviate from the 0.3 FAR standard at 3336 Lake
Johanna Boulevard, based on the findings of fact and the submitted plans. The motion
failed for lack of a second.
Commissioner Erler moved and Commissioner Birken seconded a motion to recommend
approval with conditions of Planning Case 26-012 for a variance to allow the property
owner to construct a porch addition resulting in a floor area ratio of 0.336 and deviate
from the 0.3 FAR standard at 3336 Lake Johanna Boulevard, based on the findings of fact
and the submitted plans in the June 3, 2026, report to the Planning Commission.
Commissioner Bjorklund stated he believed seven non-conformities on a property were too
many. He explained he would not be supporting the motion on the floor.
Commissioner Erler reported he disagreed with Councilmember Bjorklund, noting this property
was different from the previous request on Lake Johanna. He stated this property owner was
requesting one small variance and not six.
Commissioner Burlingame indicated the requested variance was very minor. He clarified for
the record that non-conformities were not the same as variances. He stated the request before the
Commission was to consider if the FAR variance meets the three-factor practical difficulty test.
He indicated the Commission cannot use this case as a vehicle to revisit conditions that were
already on the property.
The motion carried unanimously 6-1 (Commissioner Bjorklund opposed).
B. Planning Case 26-010 – Ordinance Amendments to Chapter 13 - Zoning Code
Section 1380 TCAAP Redevelopment Code for multi-use trail width and streetlight
spacing – Public Hearing
Community Development Director Reilly stated in November 2012, the City Council approved
a Joint Powers Agreement (JPA) with Ramsey County which establishes a partnership between
the City of Arden Hills and Ramsey County with the goal of the remediation and redevelopment
of the 427-acre Twin Cities Army Ammunition Plant (TCAAP) site. Under the JPA, the City and
County created a Joint Development Authority (JDA) that is the joint governing entity of the
TCAAP site as allowed by the Joint Powers Act and MN State Laws. The JDA is the authority
responsible for, but not limited to, environmental remediation, elimination of blight,
infrastructure construction and financing, comprehensive planning and zoning, and economic
development and redevelopment. The JDA Board is comprised of two County Commissioners,
two City Councilmembers, and an additional non-elected City appointee as the Chair.
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 6
Community Development Director Reilly reported between 2013 – 2016, the city facilitated
the process of developing the Master Plan for the TCAAP site, which as noted above was the
responsibility of the city under the JPA. Planning elements of the Master Plan included defining
the public engagement process, land use, circulation and movement, utilities, environmental
remediation, parks and open space, implementation plan, and a regulatory plan. In 2016, the City
adopted the TRC, Section 1380 of the zoning code which includes the regulating plan, land use
table, design standards, and other regulations related to land development that are specific to the
TCAAP site.
Community Development Director Reilly stated through the JPA in the event the JDA believes
the TCAAP Master Plan should be amended that shall be referred to the City and County for
review. The city maintains the responsibility for processing TRC and Comprehensive Plan
Amendments. As part of a TRC Amendment, the City will request confirmation of approval by
Ramsey County.
Community Development Director Reilly commented the Rice Creek Commons Public
Infrastructure Improvements team is responsible for the overall scope, progress, and key design
for Rice Creek Commons. With preparations for the construction of Rice Creek Boulevard
(formerly known as the Spine Road) underway, the Public Infrastructure Improvements team
identified lighting and trail design as topics that require further JDA discussion and direction to
ensure alignment with project goals and the overall design intent. The team drafted the attached
ordinance amendment language and prepared background information for the JDA to consider at
the February 2nd Work Session.
Community Development Director Reilly explained following the February 2 discussion,
during which the JDA reached consensus around the amendment to the TRC-required multi-use
trail design width, the item was brought back to the March 10 Special JDA Meeting with more
information to support additional discussion on the topic of lighting. The JDA reached consensus
around the proposed amendments for lighting, and a recommendation was made for City and
County staff to bring the two TRC amendments requested by Ramsey County to the respective
elected bodies for consideration. The Applicant presented the proposed amendments to the City
Council at the April 27th Work Session Meeting. The City Council reached consensus that the
amendments could be advanced to the Planning Commission for review.
Community Development Director Reilly commented on the proposed ordinance amendments
for Planning Commissions review. The draft language allows for greater intervals between
streetlights along Rice Creek Boulevard and allows for a reduction in the minimum width for
shared use paths and trails on Rice Creek Boulevard from 12 feet to 10 feet. These amendments
are to Section 1380 – TCAAP Redevelopment Code, y and only applicable to infrastructure
associated with the Rice Creek Commons area of Arden Hills.
Community Development Director Reilly reported the Applicant states that reducing the
minimum required trail width along Rice Creek Boulevard would also qualify the trail for a Rice
Creek Watershed District Rules exception for trails that are 10 feet or less and allow for a
relative reduction in required stormwater treatment volume compared to the requirements for a
12-foot width trail. Reducing the required trail width from 10 feet to 12 feet would reduce
project costs for stormwater treatment and trail materials.
Community Development Director Reilly provided the Findings of Fact for review:
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 7
General Findings:
1. The Applicant is proposing to amend ordinance language in Chapter 13 – Zoning Code
Section 1380 – TCAAP Redevelopment Code.
2. The proposed ordinance amendment would allow for streetlight spacing along the length
of the Rice Creek Boulevard Corridor that meets the Recommended Footcandle Levels as
established in the MnDOT Roadway Lighting Design Manual.
3. The Applicant states that the proposed ordinance language will ensure adequate lighting
while reducing infrastructure costs and long-term maintenance and operation costs.
4. The proposed ordinance amendment would allow for a minimum multi-use trail width of
10 feet along Rice Creek Boulevard.
5. The Applicant states that the proposed ordinance language would meet minimum width
standards as set by MnDOT’s Bikeway Facility Design Guide, ADA and Public Right-of
Way Accessibility Guidelines, and other local standards while minimizing costs for
additional trail width and additional stormwater treatment under the Rice Creek
Watershed District.
6. The proposed ordinance amendments are generally in the public interest and in keeping
with the City’s Comprehensive Plan.
7. Amendments to the Zoning Code regulations require a public hearing prior to action by
the City Council.
Community Development Director Reilly reviewed the options available to the Planning
Commission for Planning Case 26-010 Zoning Code Ordinance Amendments to Chapter 13 in
Section 1380 – TCAAP Redevelopment Code of the Arden Hills City Code to modify language
to allow for greater intervals between streetlights along Rice Creek Boulevard and allow for a
reduction in the minimum width for shared use paths and trails on Rice Creek Boulevard from 12
feet to 10 feet.
1. Recommend Approval
3. Recommend Denial
4. Table
Chair Collins opened the floor to Commissioner comments.
Commissioner Lindau requested further information from the County regarding why this
request was being made.
John Mazzitello, Ramsey County Deputy Director for Public Works, introduced himself to the
Commission. He explained at the time the TRC was developed, the project was in a highly
conceptual stage. He reported the project has since moved along and 12-foot trail widths were no
longer being considered. For this reason, it made sense to change the 12-foot trail width to 10
feet. He commented further on County’s lighting standards for trails and roadway corridors.
Michael Kirsch, Kimley Horn, commented further on the three trail corridors that would run
through Rice Creek Commons.
Commissioner Bjorklund inquired if the proposed changes were being made at the request of a
developer or were the requests coming from the County.
Mr. Mazzitello explained the requests were coming from Ramsey County.
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 8
Commissioner Jacobson thanked the County for making these recommendations. She noted she
supported the two proposed changes.
Commissioner Erler asked why the multi-use trail in the neighborhood would be 12 feet wide
when the trail along Rice Creek Boulevard would be 10 feet.
Mr. Mazzitello indicated the regional trail along the east side of the development will belong to
Ramsey County Parks and Recreation and they have different standards than Ramsey County
Public Works.
Commissioner Lindau questioned if this trail would be multi-modal.
Mr. Mazzitello reported all three trails would be multi-modal.
Commissioner Bjorklund encouraged the County to put additional conduit in the ground for
future lighting along the trail corridors.
Mr. Mazzitello stated this was being discussed by the County.
Commissioner Burlingame asked if there was an approval process for the foot candle
compliance before infrastructure was accepted by the City.
Community Development Director Reilly explained the City did have a process in place.
Chair Collins opened the public hearing at 7:30 p.m.
Chair Collins invited anyone for or against the application to come forward and make comment.
There being no comments, Chair Collins closed the public hearing at 7:30 p.m.
Commissioner Birken moved and Commissioner Erler seconded a motion to recommend
approval of Planning Case 26-010 as presented for Zoning Code Ordinance Amendments
to Chapter 13 in Section 1380 – TCAAP Redevelopment Code of the Arden Hills City Code
to modify language to allow for greater intervals between streetlights along Rice Creek
Boulevard and allow for a reduction in the minimum width for shared use paths and trails
on Rice Creek Boulevard from 12 feet to 10 feet as discussed in the June 3, 2026 Report to
the Planning Commission. The motion carried unanimously (7-0).
C. Planning Case 26-008 – 3761 Lexington Avenue – Site Plan Review and Conditional
Use Permit – Public Hearing
Senior Planner Fransen presented Vector Styling, Inc. (“The Applicant”) is requesting a
Conditional Use Permit and Site Plan Review to operate a vehicle window tinting and stereo
installation facility in 3,900 square feet of the existing 10,108 square foot service station and
retail sales facility at 3761 Lexington Avenue (“Subject Property”). As part of site plan review,
the Applicant seeks a sign standard adjustment to install 110 square feet of new signage on the
property.
Senior Planner Fransen stated the Applicant submitted a land use application for a Conditional
Use Permit and Site Plan Review at the Subject Property. The Applicant plans to lease 3,900
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 9
square feet of an existing facility for a new business, TINT WORLD. The proposed space would
combine two tenant spaces into one and share the building with TGK Tires, another service
station use. A Conditional Use Permit is required for a service station use within the proposed
3,900 square foot tenant space.
Senior Planner Fransen explained the Applicant proposes to combine the two unoccupied
tenant spaces into one and use five existing bay areas for services and provide a retail area and
waiting room for customers. Employee and customer parking needs will be met by 30 parking
spaces to the south and west of the tenant space. An application for a Conditional Use Permit
requires a Site Plan Review application. Through the site plan review process, an applicant can
request flexibility from the strict application of the zoning code by applying for a Sign Standard
Adjustment as part of site plan review. The applicant proposes two 55 square foot wall signs be
installed above the main entrance. The property is located in Sign District 5. The maximum
amount of signage allowed in Sign District 5 is 80 square feet.
Senior Planner Fransen reviewed the Site Data, the Plan Evaluation and provided the Findings
of Fact for review:
General Findings:
1. The applicant has a lease agreement for space in the subject property located at 3761
Lexington Avenue, Arden Hills, MN.
2. The Subject Property is located within the Service Business District designated for
Commercial Uses on the 2040 Comprehensive Plan.
3. The Subject Property is zoned B-3 Service Business.
4. A service station use requires a conditional use permit in the B-3 District.
5. The Subject Property is located in Sign District 5, where the maximum wall signage
permitted is 80 square feet.
6. The Subject Property has two existing wall signs for a total of 80 square feet.
7. Section 1260.01, adjustments to the requirements and standards for the height, number,
type, lighting, area, and/or location of a sign or signs established by Chapter 12 Sign
Code may be approved with a Site Plan Review.
8. The Applicant applied for a site plan review with a sign standard adjustment and
conditional use permit to establish a vehicle window tinting and stereo installation service
station at 3761 Lexington Avenue.
9. The applicant requested a sign standard adjustment to install an additional 110 square feet
of wall signage, bringing the total building wall signage to 190 square feet.
10. The Applicant proposes to restripe the parking lot on the site, install a gate to the existing
trash enclosure, and provide an additional accessible parking space.
11. The Applicant requests to waive the requirement for a traffic study. The Applicant offers
sufficient data in the application to demonstrate the proposed use will not result in a large
amount of additional traffic and that the current conditions of the site can support the
anticipated traffic.
12. The proposed plan does not conflict with the general purpose and intent of the Zoning
Code or the Comprehensive Development Plan for the City.
13. The proposed use is not anticipated to create a negative impact on the immediate area or
the community as a whole.
14. The proposed plan will not produce any permanent noise, odors, vibration, smoke, dust,
air pollution, heat, liquid, or solid waste, and other nuisance characteristics.
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 10
15. The proposed plan is not expected to have significant impact on traffic or parking
conditions.
16. A public hearing is required for a conditional use permit.
17. Property owners within 1000 feet of the subject property were notified of the application
as established in city code.
Senior Planner Fransen reviewed the options available to the Planning Commission for
Planning Case 26-008 for a site plan review with sign standards adjustment and a conditional use
permit to establish a vehicle window tinting and stereo installation service station and install up
to an additional 110 square feet in wall signage at 3751 Lexington Avenue:
1. Recommend Approval with Conditions
1. The project shall be completed in accordance with the submitted plans as amended by the
conditions of approval. Any significant changes to these plans, as determined by the
Community Development Director, shall require review and approval by the Planning
Commission and City Council.
2. The proposed parking area shall conform to all other regulations in the City Code.
3. A Building Permit shall be obtained for alterations to the existing principal structure.
4. A separate sign permit shall be required for each sign on the site.
5. Any future trash enclosure shall use gates and be constructed on three sides using the
similar or complementary materials, colors, and patterns used on the building. Locations
shall be approved by the Planning Department.
2. Recommend Approval as Submitted
3. Recommend Denial
4. Table
Chair Collins opened the floor to Commissioner comments.
Commissioner Burlingame inquired what the total signage allowed was for this building,
noting TGK Tires already had signage on the building. He asked if a sign standard adjustment
would remain with the property.
Community Development Director Reilly stated the sign standard adjustment would remain
with the user but the conditional use permit would remain with the property, if a similar use were
to occupy the property within 90 days of the applicant vacating the site. He noted 80 square feet
was allowed for signage. He commented further on the sign code amendments that would be
coming forward for City Code.
Commissioner Burlingame requested further information on why staff was recommending the
traffic study be waived.
Senior Planner Fransen stated this recommendation was made in the Findings of Fact because
staff has sufficient information from the applicant.
Commissioner Jacobson reported the total sign limit for the building was 80 square feet, which
had to be split among the users of the building.
Senior Planner Fransen stated this was the case.
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 11
Commissioner Jacobson commented visibility was a concern given how this property was
setback from Lexington Avenue. She appreciated the fact that visitors to this business would be
coming by appointment. She questioned if this business would have a free-standing sign as well
as signage on the building.
Senior Planner Fransen indicated the applicant would have signage on the free-standing pylon
sign in addition to the proposed wall signage on the building.
Commissioner Erler supported this business having a visible sign given how this building was
setback from Lexington Avenue. However, he questioned if it was necessary to have additional
signage on the southern facing elevation of the building.
Nick Jorczak, representative for the applicant, reported this request was being made for traffic
flow purposes through the parking lot as this signage would point visitors to the entrance of the
business.
Commissioner Birken asked if Tint World worked with the other tenant to get signage on the
east face of the building.
Mr. Jorczak explained this was TGK’s space and he did not believe this would be an option.
Senior Planner Fransen commented this would be an option for the applicant to discuss with
the property owner.
Commissioner Birken stated she did not object to the size of the sign, noting the signage was
necessary in order to be seen from Lexington Avenue, but encouraged the applicant to speak
with the property owner to see if the signage could be placed on the east face of the building.
Kevin Murray, representative for the applicant, thanked Commissioner Birken for this
suggestion and noted he and Mr. Jorczak could speak with the property owner regarding this
matter.
Chair Collins inquired if approval of the sign standard adjustment was size and location based.
Senior Planner Fransen reported the motion language would allow the applicant to install up to
110 square feet of wall signage at 3751 Lexington Avenue and the location on the building was
not specified.
Chair Collins asked if the current motion language would allow the applicant to install one large
110 square foot sign.
Senior Planner Fransen stated the applicant would have to follow the submitted plans per the
current motion language.
Commissioner Lindau commented he wanted this business to be successful along the Lexington
Avenue corridor.
Commissioner Jacobson explained she had concerns with signage being on both faces. She
supported the signage only being located on the face adjacent to Lexington Avenue. She
questioned if the signage on the southern face of the building was necessary.
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 12
Mr. Jorczak reported the south-facing sign was proposed for impressions. He stated the more
impressions passersby get from the building and pylon signs, the better. He commented on how
users of the car wash would be viewing the sign on the southern face of the building, which
would also leave an impression.
Commissioner Jacobson inquired if the applicant would support scaling down the size of the
sign in order to meet the 80 square foot requirement. She stated this would require the applicant
to have 40 square foot signs on the two faces of the building.
Mr. Jorczak indicated the proposed signage was very similar in size to the TGK sign.
Senior Planner Fransen commented further on the amount of open space on the Tint World
sign.
Mr. Murray thanked City staff for all of their assistance with this request and for
accommodating him via Zoom.
Chair Collins opened the public hearing at 8:10 p.m.
Chair Collins invited anyone for or against the application to come forward and comment.
There being no comments from the public, Chair Collins closed the public hearing at 8:11 p.m.
Chair Collins stated he was of the opinion the proposed signage would be similar in size and
scale to the TGK signage.
Commissioner Burlingame moved and Commissioner Lindau seconded a motion to
recommend approval of Planning Case for a site plan review with sign standards
adjustment and a conditional use permit to establish a vehicle window tinting and stereo
installation service station and install up to an additional 110 square feet in wall signage at
3761 Lexington Avenue, based on the findings of fact, subject to the conditions in the June
3, 2026, report to the Planning Commission.
Commissioner Jacobson reported approval of this motion would mean this building would have
190 square feet of wall signage.
The motion carried unanimously (7-0).
Chair Collins recessed the Planning Commission meeting at 8:15 p.m.
Chair Collins reconvened the Planning Commission meeting at 8:23 p.m.
D. Planning Case 26-011 – City of Arden Hills – Ordinance Amendments to Chapter 13
– Zoning Code Section 1325 Adding Language for Accessory Dwelling Units –
Public Hearing
Community Development Director Reilly stated in 2025, the City Council requested a work
session agenda item to allow for discussion of Accessory Dwelling Units (ADUs). At the April
13, 2026, City Council work session, the Council considered information related to permitting
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 13
ADUs, including information from other metropolitan area municipalities related to permitting
ADUs. That information is included in this memo. At the work session, the Council asked city
staff to craft an ordinance that included the following provisions:
A. Allow ADUs as an accessory use in residential districts.
B. Prohibit units not attached to either the principal structure or an existing accessory
garage.
C. Allows not more than one ADU per residential lot.
D. Maintains existing impervious surface coverage, setbacks, and other adopted provisions
of the code related to dimensional standards.
E. Requires that utilities be provided through the principal dwelling while also providing for
a mechanism to ensure residents in either dwelling unit have independent understanding
of their use of the utility.
F. Prohibits the separate sale or subdivision of the secondary unit (ADU).
G. Requires – to the extent possible - at least one of the dwelling units on the property to be
occupied by a property owner.
Community Development Director Reilly reviewed a definition for ADUs, described reasons
municipalities allow ADUs, and commented on the draft ordinance. Staff requests the Planning
Commission provide any comments, questions, concerns or ideas related to the above provisions.
These will be considered and passed on to the City Attorney in order to ensure the ordinance
language meets the intent, purpose, and direction of the Planning Commission and the City
Council, as appropriate and subject to applicable laws and regulations. While ADUs alone will
not solve the region's housing crisis, or Arden Hills’ share of the need, they offer a proven,
neighborhood-scale contribution to housing choice, supply, affordability, aging in community,
and multigenerational living as part of a broader housing strategy. The benefits align with the
city’s housing goals in the 2040 Comprehensive Plan as well as the newly adopted strategic plan.
Chair Collins opened the floor to Commissioner comments.
Chair Collins discussed how there were two sections of the Ordinance that were still open at this
time.
Community Development Director Reilly explained the draft language for these two sections
was being reviewed by the City Attorney. He indicated the goal of this language was to bring
existing ADUs into conformance as much as possible through an administrative review.
Chair Collins stated it appears this ordinance would be tabled until July or August to allow this
language to be brought forward to the Planning Commission for consideration prior to moving
forward to the City Council.
Community Development Director Reilly indicated this item could be tabled to the July
Planning Commission meeting.
Commissioner Erler thanked staff for the detailed presentation on this matter.
Commissioner Lindau asked why a detached ADU would not be allowed.
Councilmember Weber explained he was uncertain why the Council did not support detached
ADUs.
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 14
Commissioner Bjorklund commended staff for the well written staff report and presentation.
Commissioner Jacobson inquired if tiny homes, which were mobile, would qualify as an ADU.
Community Development Director Reilly stated tiny homes meeting the size requirement and
installed on a permanent foundation would qualify as an ADU.
Chair Collins opened the public hearing at 9:02 p.m.
Chair Collins invited anyone for or against the application to come forward and comment.
Steve Nelson, 3475 Seims Court, indicated he would like a limitation set on the number of
occupants within an ADU. He recommended steps be allowed to go up to the ground floor. He
recommended ADUs be allowed within a trust. He suggested new construction permits not allow
residents to live within an ADU without finishing the principal structure. He recommended
proper address signage be required for ADU units. He stated he was concerned with how the
City would monitor the occupants in rental ADUs and noted he also had concerns regarding
parking. He supported ADUs be permanent structure and not mobile. He asked if ADUs would
be allowed if a property already had an accessory structure.
There being no additional comment Chair Collins closed the public hearing at 9:09 p.m.
Community Development Director Reilly responded to the public comment noting the parking
language requires a property to have one parking space for the ADU. He commented further on
how City Code defines a family and household.
Commissioner Birken stated she believed the detached ADU option was missing from this
ordinance. She questioned why the City Council objected to detached ADUs. She asked why the
height was limited to 25 feet. She noted she supported a property having one or two internal
ADUs. She explained she supported a smaller house on a large property in Arden Hills becoming
an ADU, noting a larger home could be built on the same property. She questioned why one
garage stall would have to remain open in a garage ADU. She requested staff take a look at the
exterior step language within the ordinance. She recommended that ADUs not have to be owner
occupied because some properties may be in a trust or residents may be living
intergenerationally.
Commissioner Burlingame stated his main concerns with the ordinance at this time were with
owner occupancy verification, short term rental, utilities and how the City would be addressing
non-conforming ADUs. He discussed how the City verifies homesteaded properties and
recommended the short-term rental language for ADUs be further considered. He supported
submetering be required for ADUs. He explained he supported the draft of this ordinance being
forwarded along to the City Council with recommendations from the Planning Commission.
Commissioner Erler commented on the ADU ordinance owner-occupied requirement. He
explained no other city that allows ADUs requires separate utilities. He stated the City’s stance
around the short-term rental of ADUs was also a concern for him. He reported this led him to
further consider what the City was trying to accomplish with ADUs. He asked if the goal was to
create more affordable housing units or create intergenerational housing.
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 15
Commissioner Lindau stated he believed ADUs were an excellent option to allow residents to
age in place. He supported the City having a low number of regulations in place when it came to
ADUs. He commented on the number of ADUs in Minneapolis, noting only 120 units were
added over the past 10 years. He reported there were a lot of barriers to adding an ADU to a
property in Arden Hills and believed this probability should be further studied. He discussed how
modular construction was becoming more applicable.
Commissioner Bjorklund indicated that ADUs usually do not alter the fundamental character of
the existing neighborhood. He discussed how ADUs were constructed without public subsidies.
He supported the City adopting this Ordinance at this meeting, with the understanding that
amendments could be made in the future.
Commissioner Jacobson reiterated that the focus for ADUs should be to add housing units to
Arden Hills. She indicated she did not support ADUs becoming short term rentals but did
support the City having detached ADUs.
Chair Collins commented he had concerns with moving this ordinance forward without all of
the ordinance language in place. He stated the City is pursuing ADUs in order to increase
housing stock and affordability. He was of the opinion the Commission had to further consider
the ordinance language when it comes to ADUs as short-term rentals. He asked if the
Commission supported allowing detached ADUs.
Commissioner Lindau stated he supported detached ADUs as this would provide homeowners
with another option for locating an ADU on their property.
Commissioner Birken supported this option as well.
Commissioner Burlingame indicated he would like to see detached ADUs allowed, however,
he understood the City Council did not support this option.
Commissioner Bjorklund and Commission Jacobson supported detached ADUs as well.
Chair Collins requested further information regarding the height limit for ADUs.
Senior Planner Fransen reported other communities have set height limits for ADUs.
Community Development Director Reilly indicated the proposed requirement aligns with the
height limits established in City Code. He discussed the differences between an accessory use
and an accessory structure. He commented the language could be changed to allow for a height
no more than 35 feet.
Commissioner Birken supported this recommendation.
Commissioner Jacobson stated she did not support allowing ADUs to be 35 feet tall because
this would be out of scale with many homes in the community.
Chair Collins recommended staff further investigate the height limit language within the
ordinance. He asked if ordinance language would allow an existing small home to become an
ADU if the lot size allowed for the construction of a new home.
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 16
Community Development Director Reilly commented the existing language does not account
for this scenario.
Commissioner Lindau anticipated there were very few lots in Arden Hills that would allow for
this scenario.
Chair Collins inquired if the City was only interested in allowing one ADU on a property.
Community Development Director Reilly stated the direction was to allow only one ADU at
this time.
The Commission supported this requirement.
Chair Collins asked that staff review the front stoop/step language for clarification purposes. He
asked how the Commission wants to address the owner-occupancy requirement.
Commissioner Birken feared that this requirement would make it more difficult for an
individual to get financing and was a barrier that the City should not have in place. She stated if
the concern was that corporations would be buying up housing in Arden Hills and creating
ADUs, language could be drafted to address this concern.
Community Development Director Reilly stated the owner occupancy requirement was put in
place due to the perception owners care more for their property and community than renters. He
reported the corporate ownership of properties was a separate issue.
Commissioner Birken was of the opinion the perception that owners took better care of their
property was biased and classist. She supported children being able to live in a parent’s home if
the parent wanted to go and travel the world, without requiring the parent to sell their home.
Chair Collins questioned how the ordinance language should be worded.
Commissioner Birken recommended the owner-occupied requirement be removed from the
ordinance. She stated the data shows 90% of ADUs are going to be owner occupied.
Chair Collins asked if the Commission supported the subdivision of utilities.
Commissioner Burlingame recommended submetering be required along with a separate
address.
Commissioner Lindau reported the utility provider would bear the expense of running the line
for the additional meter.
Commissioner Bjorklund suggested the language read installation of a meter or submeter.
Commissioner Erler stated he was of the opinion the separation of the meter should be
determined by the owner of the house. He reported no other city requires meters to be split.
Chair Collins asked if the Commission wanted to move this ordinance forward or should the
ordinance be brought back to a future meeting for further consideration.
ARDEN HILLS PLANNING COMMISSION – June 3, 2026 17
Commissioner Erler stated he was not comfortable approving the ordinance at this time, noting
there were currently two blank sections.
Commissioner Birken indicated she would like to see a new draft of the ordinance prior to
making a recommendation.
Chair Collins suggested the ordinance be laid over until the August Planning Commission
meeting.
Commissioner Lindau supported this recommendation.
Commissioner Erler moved and Commissioner Burlingame seconded a motion to postpone
action on the ADU ordinance to the August 5, 2026 Planning Commission meeting.
Commissioner Bjorklund explained he would be forwarding his comments to staff in order for
these items to be incorporated into the revised ordinance.
The motion carried unanimously (7-0).
UNFINISHED AND NEW BUSINESS
None.
REPORTS
A. Report from the City Council
Councilmember Weber provided the Commission with an update from the City Council. He
reported the City Council approved the affordable housing ordinance with amendments. He
explained the Council was working through the Zoning Code updates. He stated the 75th
Anniversary of Arden Hills would be celebrated on Friday, July 17 at Cummings Park.
Community Development Director Reilly discussed the planning cases that would be
addressed by the Commission at the July 8, 2026, Planning Commission meeting.
B. Planning Commission Comments and Requests
Commissioner Bjorklund asked what the status was for the apartments being constructed on the
North Heights Church property.
Senior Planner Fransen reported Trident Development was still closing on this property with
the church and it is anticipated that construction should begin later this summer.
ADJOURN
Commissioner Birken moved, seconded by Commissioner Bjorklund, to adjourn the June
3, 2026, Planning Commission Meeting at 10:22 p.m. The motion carried unanimously (7-
0).
Page 1 of 9
PC Agenda Item – 3A
MEMORANDUM
DATE: July 8, 2026
TO: Planning Commission Chair and Commissioners
FROM: Elena Fransen, AICP, Senior Planner
SUBJECT: Planning Case #26-013 – Public Hearing Required
Applicant: EFH Co. on behalf of Powder Technology
Property Location: 1300 Grey Fox Road
Request: Conditional Use Permit and Site Plan Review
Requested Action
EFH Co. (“The Applicant”) is requesting a Conditional Use Permit and Site Plan Review to create
an internal drive lane with the addition of 6,098 square feet of pavement on the existing 6.55-acre
parcel at 1300 Grey Fox Road (“Subject Property”). The proposed constitutes a substantial
modification to the existing Conditional Use Permit and Site Plan regulating the site, triggering
amendments and City review.
Background
1. Existing Conditions
The Subject Property is the location of an existing 80,267 square foot office and warehousing
facility owned and operated by Powder Technology (“The Property Owner”). The facility was
originally constructed in 1969 as a warehousing use. The property is accessible from Grey Fox
Road on the north and the site is served by rail on the south.
On April 8, 1991, the City Council adopted the I-Flex zoning ordinance, which established that
wholesaling, warehousing, and related uses in this district shall require special use permits to allow
such uses to continue, provided that the ratio of special uses to the gross floor area on the site did
not exceed those established in the special use permit. In 1991, Tyson Companies, the occupant of
the subject property, submitted for a special use permit to establish the following ratios of uses:
Page 2 of 9
Building Usage Area
- Office 5,600 square feet (6.5%)
- Warehouse, interior
loading area, small office
and lunchroom on
mezzanine level
80,400 square feet (93.5%)
Total floor area 86,000 square feet (100%)
Special use permit 91-011 also established that 43,851 square feet of the subject property would
be utilized for parking and loading area with a percentage of parking/loading area to area of
principal uses of 50.9%. As approved by the City Council on April 27, 1992, future expansion or
modification which complies with these percentages should be allowed.
In 2014, Powder Technology took ownership of the property. The property remains under the
conditions and approvals of the 1991 special use permit and use expansions and modifications are
subject to City review.
2. Overview of Request
The Applicant submitted a land use application for a Conditional Use Permit and Site Plan Review
at the Subject Property. The proposal adds 6,098 square feet of pavement to create an internal drive
lane. Landscaped area is proposed to be removed between the two existing parking areas and from
a portion of the parking “peninsula” separating the east parking area from the east loading dock.
The proposal will connect the two separate halves of the existing parking and loading area to
accommodate truck maneuvering and circulation on the site.
Proposed Site Plan of Work Area
The Applicant’s narrative notes that site conditions require delivery trucks to back into the site
directly from Grey Fox Road to access the loading docks. The proposal would allow trucks to enter
the site in a forward direction, circulate internally, and back into loading docks entirely on-site.
Page 3 of 9
The proposal increases the established parking and loading area of 43,851 square feet by 6,098
square feet, bringing the percentage of parking/loading area to area of principal uses to 58.1%. The
drive lane requires the removal of three (3) parking spaces on the site, bringing the total parking
spaces on the site to 82 parking spaces.
The Applicant is not requesting any changes to the established warehouse or office use areas within
the building. An interior office remodel is anticipated in 2026 to accommodate expanded
operations at the site. Those changes would not alter the nature or intensity of the approved use.
Approvals
1. Conditional Use Permit
Arden Hills Zoning Code requires a Conditional Use Permit for warehousing in the I-FLEX
Zoning District. Section 1355.04 Subd. 3 lists the general criteria for evaluating CUP applications.
The Planning Commission and City Council should consider the effect of the proposed use upon
the health, safety, convenience and general welfare of the owners and occupants of the surrounding
land and the community, in general, including but not limited to the following factors:
1. Existing and anticipated traffic and parking conditions;
2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid waste, and
other nuisance characteristics;
3. Drainage;
4. Population density;
5. Visual and land use compatibility with uses and structures on surrounding land;
6. Adjoining land values;
7. Park dedications where applicable;
8. Orderly development of the neighborhood and the city within the general purpose and
intent of the Zoning Code and the Comprehensive Development Plan for the City.
Under state law a “conditional use” is a use that is generally allowed in a designated district upon
the applicant showing that the standards and criteria stated in the ordinance will be satisfied.
Conversely, if the applicant is unable to show that the ordinance standards are met, the application
can be denied. Conditions may be added to any approval to ensure that the use does not negatively
impact surrounding properties or the public way.
The Subject Property is currently regulated by the special use permit and site plan approved in 91-
011. The Applicant is requesting an amendment to the adopted site plan to change the site parking
and loading area established in the 91-011 SUP approval.
Chapter 13, Zoning Code Section 1355 Administration and Procedures, states an application for
amendments to site plans and conditional use permits shall be administered in the same manner as
required for a new application. Any structural alteration, enlargement, or intensification change in
site plan, or similar change not specially permitted, shall require City Council action and all
procedures shall apply as if a new application were being requested.
Page 4 of 9
2. Site Plan Review
A site plan review and evaluation of site conditions are required as part of the Applicant’s request
for a Conditional Use Permit Amendment. The site plan review includes a review of requirements
for landscaping and parking as they relate to the zoning district and approved uses.
Plan Evaluation
The proposal is subject to Zoning Code standards established in Section 1320, District Provisions,
Section 1325.05, Design Standards and Section 1325.06, Requirements for Parking, Loading and
Circulation. The following evaluation identifies how the Applicant’s proposal addresses where
standards are met and/or nonconforming and/or where flexibility is required.
Chapter 13, Zoning Regulations Review
1. District Provisions (I-FLEX District) – Section 1320
Under the 2040 Comprehensive Plan, this site is guided as Light Industrial and Office (IND) on
the land use plan and is zoned I-FLEX under the Zoning Code. The Future Land Use designation
is for a broad range of light industrial uses such as manufacturing, processing, and warehousing.
Compatible uses such as office buildings are also intended for this area.
Direction 2040 Comp. Plan Land Use Zoning Existing Land Uses
North IND – Light Industrial and Office I-FLEX District Flex Industrial Center
South COM – Commercial B-2 General Business
District
Railroad, Event Center, Parking
Lot, Industrial Warehouse
East IND – Light Industrial and Office I-FLEX District Industrial Warehouse
Warehousing is allowed by a conditional use permit within this district. The table below provides
the standards for the I-FLEX District and the preliminary analysis for the principal structure and
the site:
Ordinance Requirements I-FLEX District
Standards
Existing
Development
Proposed
Development
Maximum Floor Area Ratio (FAR) 0.8 0.31 No change,
Complies
Maximum Structure Coverage 40% 28.1% No change,
Complies
Minimum Landscape Lot Area 25% 53.9% 51.76%,
Complies
Minimum Front Yard Setback 50 feet 136.89 feet No change,
Complies
Minimum Rear Yard Setback 20 feet 49.77 feet No change,
Complies
Minimum Side Yard Setback 20 feet (min)/
40 feet (total)
264.17 and 37.39
feet/ 301.56 feet
No change,
Complies
Minimum Lot Area 24,000 square feet 285,226 square
feet
No change,
Complies
Maximum Building Height 45 feet 29 feet No change,
Complies
The proposed will decrease the landscape lot area from 53.9 percent to 51.76 percent, which
exceeds the minimum required landscape lot area of 25 percent. With the proposed drive lane, the
Page 5 of 9
Subject Property will remain in compliance with the district provisions in the I-Flex Zoning
District.
2. Design Standards – Section 1325.05
Landscaping – Meets Requirements
A landscaping plan is required for this application because the proposed includes the expansion of
an industrial parking lot by at least 5,000 square feet when an approved landscape plan is not on
file with the city.
The Applicant included a landscaping plan with the current and proposed landscaping conditions
with their application materials. Plans show that there are trees along the property’s frontage on
Grey Fox Road and there is a wooded area along the west side of the property which provides
screening from Snelling Avenue. The proposed landscaped area is 51.76 percent of the total lot
area, which exceeds the minimum requirements established for the zoning district.
3. Tree and Landscaping Preservation – Section 1325.055
Tree Removal and Preservation – Meets Requirements
The Applicant proposes to remove three trees near the project area, for a total of 46 inches of
significant caliper inches of trees, with a proposal to plant 13 trees on site for a total of 31 new
caliper inches of new trees. The plan also shows that various dead and nuisance trees will be
removed as part of the project landscaping.
Section 1325.055 permits up to 10 percent of existing significant trees to be removed without
requiring replacement. For significant trees removal above the permitted 10 percent, caliper inches
shall be replaced at a ratio of one new caliper inch for every two caliper inches removed. Based
on the provided landscaping plans, 4.6 caliper inches could be removed without replacement and
the remaining 41.4 caliper inches to be removed would require at least 20.7 caliper inches in
replacement trees.
Considering the existing tree coverage on the subject property, the Applicant’s proposed plans
exceed the minimum requirements for replacement. In a communication with staff, the Applicant
shared that given how many trees are within the west wooded area and the difficulty of traversing
this part of the lot, the project team determined that the base calculations for tree removal would
be limited to the landscaped area adjacent to the building frontage. The property owner is also
interested in improving the curb appeal and has proposed to install a more caliper inches of trees
than required and to remove additional dead and nuisance trees, which do not require replacement.
4. Section 1325.06 - Requirements for Parking, Loading and Circulation
Construction Standards – Meets Requirements
The Applicant’s proposal creates a new parking area drive lane to improve circulation on the site.
The zoning code requires all off-street parking areas and drives to be improved with a paved
surface and the city and the Rice Creek Watershed District require surfacing to be graded and
drained to dispose of all surface water accumulation within the area. A concrete curb and gutter
are also required. The submitted civil plans show the proposed will meet the standards for surfacing
and curbing. Permits from the City and Rice Creek Watershed District are required for the
proposed.
Page 6 of 9
Off Street Parking Spaces Required – Alternative Standard Proposed
There are 85 parking spaces on the site. The Applicant proposes to remove three parking spaces
adjacent to the east parking peninsula as part of the new drive lane project, bringing the total
parking spaces to 82.
The approved uses for the subject property are office and warehousing. The Zoning Code
establishes the minimum required off-street parking spaces by use and the table below evaluates
the requirements for the Subject Property:
Land Use
Parking
Requirement
Required
Stalls by
Use
Total
Required
Stalls
Existing
Stalls
Proposed
Stalls
Parking
Deficiency
Business &
Professional
Office @
6.5% or
5,600 sq. ft.
1 for each
250 sq. ft. of
floor area
22.4 stalls
102.4 stalls 85 stalls 87 stalls -15.4 stalls Other
Business and
Industry @
93.5%
warehouse or
80,600 sq. ft.
1 for each
1,000 sq. ft.
of floor area
80.4 stalls
The Applicant states that the parking required by the zoning code exceeds the parking needs on
the subject property. The application includes a request to consider the existing uses as “Uses Not
Specifically Noted Including Public Uses,” which allows a minimum parking requirement as
determined by the City Council after recommendation by the Planning Commission. As part of
their request, the Applicant provided a proof-of-parking plan which shows 87 parking spaces
available on the site.
The Applicant states that the property provides parking in excess of operational demand. It is noted
that current and anticipated operations require 25 parking spaces and that there is minimal visitor
traffic. The Applicant requests consideration to approve the subject property with 87 parking stalls.
A finding of fact is drafted for the Planning Commission to consider recommending approval of
the proposed parking.
Traffic and Circulation – Meets Requirements
The loading and unloading of delivery trucks is a main feature of the approved operations at the
subject property and the Applicant has identified site issues such as safety challenges for drivers,
obstructions of the roadway, and traffic congestion along the public road. The proposed is intended
to improve circulation on the site and redirect operational traffic from Grey Fox Road onto the
subject property, improving operational efficiency. The Zoning Code requires vehicular traffic
generated by industrial uses to be channeled and controlled in a manner that will avoid congestion
on the public streets and traffic hazards. The proposal is intended to improve traffic circulation
conditions both on the subject property and the adjacent public street, Grey Fox Road.
Page 7 of 9
Additional Review
Building Official
The Building Official reviewed the plans and provided no comments. A Building Permit is not
required for the proposed.
Public Works Director/City Engineer
The Public Works Director/City Engineer reviewed the plans and provided no comments. A
Grading and Erosion Control Permit is required for the proposed and the standard conditions for
approval are included for review.
Rice Creek Watershed District
The Rice Creek Watershed has been sent the plans but has not provided comments at the time of
report drafting. A condition of approval for applicable RCWD permits is included for review.
Findings of Fact
General Findings:
1. The Applicant is a representative for the owner and occupant of the subject property located
at 1300 Grey Fox Road, Arden Hills, MN.
2. The Subject Property is designated as Light Industrial & Office (IND) in the 2040
Comprehensive Plan.
3. The Subject Property is zoned I-FLEX Zoning District.
4. A warehouse requires a conditional use permit in the I-FLEX District.
5. The Applicant applied for a site plan review and conditional use permit to create an internal
drive lane with the addition of 6,098 square feet of pavement at 1300 Grey Fox Road.
6. The Applicant proposes to remove 46 caliper inches of significant trees, to be replaced in
accordance with City requirements, and to remove three parking spaces.
7. The Applicant states that the site can support up to 87 parking spaces shown in the proof
of parking and that this number exceeds the parking needs for the approved operations at
the site, based on the average need of 25 parking spaces.
8. The proposed plan will not result in insufficient parking for the uses permitted under the
amended conditional use permit.
9. The proposed plan will not result in the subject property exceeding the maximum
impervious surface coverage permitted in the I-FLEX zoning district.
10. The proposed plan is not expected to have significant impact on traffic or parking
conditions. The proposed plan is intended to improve traffic circulation conditions both on
the subject property and the adjacent public street, Grey Fox Road.
11. The proposed use is not anticipated to create a negative impact on the immediate area or
the community as a whole.
12. The proposed plan will not produce any permanent noise, odors, vibration, smoke, dust, air
pollution, heat, liquid, or solid waste, and other nuisance characteristics.
13. The proposed plan does not conflict with the general purpose and intent of the Zoning Code
or the Comprehensive Plan for the City.
14. A public hearing is required for a conditional use permit.
15. Property owners within 1000 feet of the subject property were notified of the application
as established in city code.
Page 8 of 9
Options and Motion Language
Staff offers the following options and motion language for this case. The Planning Commission
may consider providing additional findings of fact as part of the motion to support their
recommendation for approval and should provide findings are part of a motion for denial.
Site Plan Review and Conditional Use Permit
• Recommend Approval with Conditions: Move to recommend approval of Planning Case
26-013 for a site plan review and a conditional use permit to create a new drive lane at
1300 Grey Fox Road, based on the findings of fact in the July 8, 2026, Planning
Commission report, subject to the following conditions:
1. The project shall be completed in accordance with the submitted plans as amended by
the conditions of approval. Any significant changes to these plans, as determined by
the Community Development Director, shall require review and approval by the
Planning Commission and City Council.
2. The proposed parking area shall conform to all other regulations in the City Code.
3. A Grading and Erosion permit shall be obtained from the city’s Engineering Division
prior to commencing any grading, land disturbance or utility activities. The Applicant
shall be responsible for obtaining any permits necessary from other agencies, including
but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey
County (i.e. ROW or access) prior to the start of any site activities.
4. The final plans shall be subject to approval by the City Engineer, Building Official, and
Fire Marshal prior to the issuance of a grading and erosion control permit.
5. Final grading, drainage, utility, and site plans shall be subject to approval by the Public
Works Director, City Engineer, and Community Development Director prior to the
issuance of a grading and erosion control permit or other development permits.
6. Upon completion of grading and utility work on the site, a grading as-built and utility
as-built shall be provided to the City for review.
7. Heavy duty silt fence and adequate erosion control around the entire construction site
shall be required and maintained by the Developer during construction to ensure that
sediment and storm water does not leave the project site.
• Recommend Approval as Submitted: Move to recommend approval of 26-013 for a site
plan review and a conditional use permit to create a new drive lane at 1300 Grey Fox Road,
based on the findings of fact in the July 8, 2026, Planning Commission report and the
submitted plans.
• Recommend Denial: Move to recommend denial of 26-013 for a site plan review and a
conditional use permit to create a new drive lane at 1300 Grey Fox Road, based on the
following findings: findings to deny should specifically reference the reasons for denial
and why those reasons cannot be mitigated.
• Table: Move to table Planning Case 26-013 for a site plan review and a conditional use
permit to create a new drive lane at 1300 Grey Fox Road: a specific reason and information
request should be included with a motion to table.
Public Comments
Notice was published in the Pioneer Press on June 26, 2026. Notice was prepared by the City and
mailed to property owners within 1000 feet of the subject property. At the time of report drafting,
the city had not received public comments on this planning case.
Page 9 of 9
Deadline for Agency Actions
The City of Arden Hills received the completed application for this request on May 27, 2026.
Pursuant to Minnesota State Statute, the city must act on this request by July 25, 2026 (60 days),
unless the city provides the petitioner with written reasons for an additional 60-day review period.
Based on the city’s adopted meeting schedule for July, the City is unable to process the planning
case within the sixty (60) day timeline and notice was provided to the applicant extending the time
period until September 23, 2026 (120 days). With consent of the applicant, the City may extend
the review period beyond the initial 120 days.
Attachments
A. Land Use Application
B. Location Map
C. Narrative
D. Survey
E. Civil Plans
F. Landscaping Plans
G. Proof of Parking
Location Map
6/26/2026, 8:57:16 AM 0 0.1 0.20.05 mi
0 0.2 0.40.1 km
1:8,000
Ramsey County
Ramsey County MN
6uEMect Property
CO
2.5 " B&B
2
GI
2.5 " B&B
5
AN
2" B&B
3
AB
8' BB
3
(1) REINSTALL SALVAGED BOULDER TYP.
BURY BOTTOM 1
3 OF BOULDER.
(2)REINSTALL SALVAGED
BOULDER TYP. BURY
BOTTOM 1
3 OF BOULDER.
DEAD TREE TYP. SEE CIVIL FOR
REMOVALS. SEED ALL AREAS OF
DISTURBED SOIL WITH TURF MIX.
DEAD TREE TYP. SEE CIVIL
FOR REMOVALS. SEED
ALL AREAS OF DISTURBED
SOIL WITH TURF MIX.
EXISTING TREE TO REMAIN
TYP.
SEE CIVIL FOR TREE
REMOVALS
EXISTING BUILDING
GREY FOX ROAD
EXISTING BOULDER TO
REMAIN TYP. (NOT
SURVEYED)
APPROXIMATE EXISTING
WOODLAND TREE LINE
SYMBOL CODE BOTANICAL / COMMON NAME CONT QTY
TREES
AB Abies balsamea / Balsam Fir 8' BB 3
AN Amelanchier x grandiflora 'Autumn Brilliance' / Autumn Brilliance Serviceberry 2" B&B 3
CO Celtis occidentalis / Common Hackberry 2.5 " B&B 2
GI Gleditsia triacanthos inermis 'Skycole' / Skyline® Honey Locust 2.5 " B&B 5
GROUND COVERS
TT Tuff Turf Seed Mix hydroseed 3,289 sf
PLANT SCHEDULE PT
16" POLYPROPYLENE OR
POLYETHYLENE (40 MIL, 1-1/2" WIDE
STRAP) (TYPICAL)
DOUBLE STRAND 14 GA. WIRE, 2
SPACED EQUALLY AT OPPOSITE SIDES
MULCH REFER TO SPECIFICATION)
PLANTING SOIL PER SPECIFICATION
GROUNDCOVER, PER PLAN
TOPSOIL
ROOTBALL TO SIT ON SUBGRADE, CUT ALL
ROPES AND REMOVE NON-ORGANIC
CONTAINERS. IF B&B STOCK, REMOVE
BURLAP AND ROPES FROM TOP 1/3RD OF
ROOT BALL, CUT WIRE BASKET DOWN TO
SECOND HORIZONTAL WIRE FROM THE
BOTTOM, AND DISPOSE OF OFF-SITE. IF
CONTAINER STOCK, REMOVE CONTAINER
SUBGRADE
EXPOSE ROOT FLARE BY REMOVING EXCESS
SOIL FROM THE TOP OF THE SOIL BALL AND
ENSURE THAT THE FIRST MAIN LATERAL ROOT
IS WITHIN TWO INCHES OF FINISHED GRADE
WITHOUT EXCEEDING FINISHED GRADE
12" MIN
18" MIN
6'-0"
STEEL STAKE
4'
-
0
"
+
/
-
2'
M
I
N
.
NOTES:
1.CONIFER TO HAVE SHREDDED HARDWOOD MULCH UNLESS NOTED OTHERWISE. NO MULCH TO BE IN
CONTACT WITH TRUNK.
2.SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING.
3.TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED.
4.IT IS THE CONTRACTORS OPTION TO STAKE TREES; HOWEVER, THE CONTRACTOR IS RESPONSIBLE FOR
MAINTAINING TREES IN A PLUMB POSITION THROUGHOUT THE GUARANTEE PERIOD.
5.DO NOT PLANT TOO DEEP: EXPOSE TOP OF ROOT FLARE AND PULL MULCH AWAY FROM TRUNK.
VA
R
I
E
S
2'
M
I
N
.
18" MIN
6'-0" STEEL STAKE
DOUBLE STRAND 14 GA. WIRE, 3'0" @
120' INTERVALS (TYPICAL)
16" POLYPROPYLENE OR
POLYETHYLENE (40 MIL, 1-1/2"
WIDE STRAP) (TYPICAL)
FLAGGING (ONE PER WIRE)
MULCH REFER TO SPECIFICATION
PLANTING SOIL, PER
SPECIFICATION
WOOD OR STEEL STAKE SET
AT ANGLE
GROUNDCOVER, PER PLAN
ROOTBALL TO SIT ON SUBGRADE,
CUT ALL ROPES AND REMOVE
INORGANIC CONTAINERS
SUBGRADE
thirty
0'15'30'60'
LA
N
D
S
C
A
P
E
P
L
A
N
&
D
E
T
A
I
L
S
scale: 1" = 30'
landscape plan1
A
1.CONFIRM ALL QUANTITIES, SHAPES AND LOCATIONS OF BEDS, AND ADJUST AS REQUIRED TO
CONFORM TO THE SITE CONDITIONS. CONFIRM ANY ADJUSTMENTS WITH THE LANDSCAPE
ARCHITECT.
2.LOCATE ALL UTILITIES. NOTIFY THE LANDSCAPE ARCHITECT OF ANY CONFLICTS WITH NEW
CONSTRUCTION.
3.THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL SOD/TURF WHICH HAS BEEN REMOVED.
4.ANY PLANT STOCK NOT PLANTED ON DAY OF DELIVERY SHALL BE HEELED IN AND WATERED
UNTIL INSTALLATION. PLANTS NOT MAINTAINED IN THIS MANNER WILL BE REJECTED.
5.THE PLAN TAKES PRECEDENCE OVER THE PLANT SCHEDULE IF DISCREPANCIES EXIST. ADVISE
LANDSCAPE ARCHITECT OF ANY DISCREPANCIES.
6.THE CONTRACTOR SHALL AVOID DAMAGING EXISTING TREES. DO NOT STORE OR DRIVE HEAVY
MATERIALS OVER TREE ROOTS. DO NOT DAMAGE TREE BARK OR BRANCHES.
7.THE CONTRACTOR SHALL KEEP PAVEMENTS, FIXTURES AND BUILDINGS CLEAN AND UNSTAINED.
ANY DAMAGE TO EXISTING FACILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. THE
PROJECT SITE SHALL BE KEPT CLEAR OF CONSTRUCTION WASTES AND DEBRIS.
8.THE CONTRACTOR SHALL RESTORE ANY EXISTING TURFGRASS DAMAGED DURING TREE
REMOVALS OR OTHER CONSTRUCTION ACTIVITIES AT THE CONTRACTOR'S EXPENSE.
9.THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PLANTING SOIL QUANTITIES TO
COMPLETE THE WORK SHOWN ON THE PLAN. MULCH, PLANTING SOIL AND OTHER
MISCELLANEOUS PLANTING COMPONENTS SHALL BE CONSIDERED INCIDENTAL TO THE RELATED
PLAN. VERIFY ALL QUANTITIES.
10.CONTRACTOR IS RESPONSIBLE FOR WATERING AND ALL PLANT CARE UNTIL FINAL ACCEPTANCE
BY THE OWNER.
11.PLANT MATERIAL SHALL BE PROTECTED AND MAINTAINED UNTIL THE INSTALLATION OF
PLANTINGS IS COMPLETE, INSPECTION HAS BEEN MADE AND PLANTING IS ACCEPTED
EXCLUSIVE OF THE GUARANTEE
12.MAINTENANCE SHALL INCLUDE WATERING, WEEDING, MULCHING, REMOVAL OF DEAD
MATERIAL PRIOR TO GROWING SEASON, RE-SETTING PLANTS AND PROPER GRADE, AND
KEEPING PLANTS IN A PLUMB POSITION. AFTER ACCEPTANCE, THE OWNER SHALL ASSUME
MAINTENANCE RESPONSIBILITIES. HOWEVER, THE CONTRACTOR SHALL CONTINUE TO BE
RESPONSIBLE FOR KEEPING THE TREES PLUMB THROUGHOUT THE GUARANTEE PERIOD.
13.WATERING: MAINTAIN A WATERING SCHEDULE WHICH WILL THOROUGHLY WATER ALL PLANTS
ONCE A WEEK AND SOD EVERY OTHER DAY UNTIL ACCEPTANCE BY THE OWNER. IN EXTREMELY
HOT, DRY WEATHER, WATER MORE OFTEN AS REQUIRED BY INDICATIONS OF HEAT STRESS SUCH
AS WILTING LEAVES. CHECK MOISTURE UNDER MULCH PRIOR TO WATERING TO DETERMINE
NEED. CONTRACTOR SHALL MAKE THE NECESSARY ARRANGEMENTS FOR WATER.
14.SEE TYPICAL PLANTING DETAILS ON THIS SHEET
planting notes
ALL LAWN AREA SHALL RECEIVE 4" MIN. COMMON TOPSOIL BORROW MN DOT SPEC. 3877-1A
soils notes
n
SIGNIFICANT TREE REMOVALS: 18" SPRUCE, 16" SPRUCE, 12" SPRUCE
TOTAL CALIPER INCHES OF SIGNIFICANT TREE REMOVALS = 46
MINIMUM TREE REPLACEMENT TOTAL CALIPER INCHES (1:2 RATIO) = 23
PROPOSED TOTAL TREE REPLACEMENT CALIPER INCHES = 31
tree replacement calcs.
planting schedule
A
A
A
A
L1.0
75
5
p
r
i
o
r
a
v
e
n
u
e
n
s
u
i
t
e
1
0
3
,
s
t
.
p
a
u
l
,
m
n
5
5
1
0
4
65
1
.
3
4
1
.
3
6
1
1
o
r
6
5
1
.
2
4
8
.
6
1
5
5
au
n
e
f
e
r
n
a
n
d
e
z
la
n
d
s
c
a
p
e
a
r
c
h
i
t
e
c
t
s
scale: NTS
deciduous tree planting typ.2 scale: NTS
coniferous tree planting typ.3
Page 1 of 2
PC Agenda Item – 3B
MEMORANDUM
DATE: July 8, 2026 (Revised 7/7/2026)
TO: Planning Commission Chair and Commissioners
FROM: Jake Reilly, Community Development Director
SUBJECT: Planning Case #26-009 – Public Hearing Required
Applicant: Roers Companies
Property Location: 3499 Lexington Avenue N.
Request: Comprehensive Plan Amendment, Zoning Code Amendment, Master
Planned Unit Development, Final Planned Unit Development, Conditional Use
Permit, Site Plan Review
Requested Action
Roers Companies (“The Applicant”), is requesting a Comprehensive Plan Amendment, Zoning
Code Amendment, Master Planned Unit Development (with flexibility), Final Planned Unit
Development, Conditional Use Permit, and Site Plan Review, to redevelop the existing office
building property at 3499 Lexington Avenue North, PID 343023110005 (“Subject Property”) to
build a 167-unit multi-family market rate apartment building with 300 parking spaces (148
enclosed) .
Background
1. Overview of Request
The Applicant has submitted a land use application for a Comprehensive Plan Amendment, Zoning
Code Amendments, Master Planned Unit Development (PUD), Final Planned Unit Development,
Conditional Use Permit, and Site Plan Review, to redevelop the approximately six acre site at the
corner of Harriet Avenue and Lexington Avenue North. Catholic United Financial (Catholic Aid
Association) owns the subject property which contains an office building constructed in 1974. The
project proposer has executed a purchase agreement with the property owner, contingent upon the
entitlements process.
The property is guided for Community Mixed Use in the adopted 2040 Comprehensive Plan (2019,
as amended). The property was first guided for Community Mixed Use with the adoption of the
2030 Comprehensive Plan (2008) and has been guided for commercial uses since at least the 2020
Comprehensive Plan (1998), with a “Commercial” land use designation. The area is also subject
to the Guiding Plan for the B-2 District (2008) which was developed to create a long-term
redevelopment plan for the area.
Page 2 of 3
The property is zoned B-2 - General Business District. The property to the west is zoned R-4 –
Multiple Dwelling Unit District, the property to the north is zoned B-2 – General Business District
and the properties to the south are zoned R-3 – Townhouse and Low Density Multiple Dwelling
District. The properties to the west and south are used for residential uses and the properties to the
north are used for business uses, primarily retail.
The Subject Property is accessed by Harriet Avenue to the south.
The City Council reviewed a concept plan from the Applicant for a 167-unit apartment building
with amenities such as a dog run, pickle ball courts, an outdoor pool, playground, and sidewalk
connections on Lexington Avenue (to complete the sidewalk south to Harriet Avenue), Harriet
Avenue, and to the Arden Plaza shopping center at the February 9, 2026, City Council work
session. The City Council confirmed an expectation that the sidewalk along the west side of
Lexington Avenue be constructed to complete the north-south sidewalk to the corner with Harriet
Avenue and then provide additional sidewalk from west along the north side of Harriet Avenue
from Lexington to the property line with 4 Pine Tree Drive. Council also requested the developer
ensure a connection to the north and the Arden Plaza Shopping Center and evaluate the opportunity
to ensure that the project offers affordable units.
Aerial map of the subject property
2. History of the Subject Property
The Subject Property was developed in 1974 as an office building for a financial institution, the
Catholic Aid Association (now known as Catholic United Financial). The existing two-story office
building is approximately 35,169 square feet with approximately 84,000 square feet of parking
and drive areas. In 2000 U.S. Wireless received a special use permit to install a cellular
communications antenna on the building (Planning Case 00-002) and in 2002, Catholic Aid
Association received a sign standard adjustment via site plan review to allow for a 20 foot sign
rather than the permitted 16-foot sign (Planning Case 01-28).
Page 3 of 4
Zoning Map of the subject property
Future Land Use Map of the subject property
Page 4 of 5
Requested Approvals
1. Comprehensive Plan Amendment
The Municipal Planning Act (1965), as amended from time to time, establishes the legal
foundation for city land use ordinances in Minnesota. State statute ( Minn. Stat. §§ 462.357
– .365) requires that all communities within the seven-county metropolitan area update
Comprehensive Plans every ten years. The purpose of a Comprehensive Plan is to ensure
the orderly and economic development of the community and establish the policy
statements, goals, standards, and maps that guide both public and private future physical,
social and economic development. A comprehensive plan lays out a vision for the city’s
future land development and land use dictating where growth should occur, the type of
growth that is allowed in various areas, and the density or intensity of that growth. Planning
Commission and City Council members use comprehensive plans to articulate the basis for
its legislative decisions and are required to evaluate development proposals of any kind as
compared with adopted comprehensive plan policies.
The Comprehensive Plan and all its amendments must reflect the adopted regional policies
in the Metropolitan Council’s system and policy plans. Local planning efforts are linked to
the larger regional infrastructure of parks and trails, road networks, and wastewater
infrastructure, and the City’s plan must conform to the regional vision. An amendment to
the Comprehensive Plan requires a recommendation from the Planning Commission
following a public hearing, and adoption of a resolution by the City Council. Adjacent
communities must be given up to 60 days to review and comment on the proposed
amendment before it can be reviewed and approved by the Metropolitan Council. The
Metropolitan Council has the final determination as to whether to allow a CPA or not,
though they provide great deference to the city as long as the proposed land use change
does not have a negative impact on a regional system (i.e. transportation, sanitary sewer,
and regional parks).
City of Arden Hills Comprehensive Plan
The property was previously guided for commercial uses since at least the 2020
Comprehensive Plan (1998), with a “Commercial” land use designation. It was first
guided for Community Mixed Use with the adoption of the 2030 Comprehensive Plan
(2008). The 2040 Comprehensive Plan continues the policy direction established in 2008
and guides the site as Community Mixed Use (CMU) with a density of 12 to 20 units per
acre and a development intensity of up to 0.8 FAR. The Community Mixed Use
designation also sets expectations for a share of uses within this area are as follows: 10%
to 50% Light Industrial; 10% to 70% Retail; 10% to 70% Office; and 10% to 50%
Residential.
The table below shows the development intensity expected in each of those planning
documents based on the future land use and the description of that land use category,
based on data that would have been available at the time the plan was prepared.
Page 5 of 6
Plan Year
(adopted)
Existing Land
Use
Future Land Use Development
Intensity/Density
2040
(2019)
OFC - Office CMU – Community Mixed Use
Areas designated for a broad range
of retail, shopping, services, and
office space to meet the needs of
the community and surrounding
areas. This area may also include
medium to high density housing
with a potential density of three to
20 units/acre.
3-20 units/acre
87 - 385 workers 1
2030
(2008)
OFC - Office CMU – Community Mixed Use
Areas designated for a broad range
of retail, shopping, services, and
office space to meet the needs of
the community and surrounding
areas. This area may also include
medium to high density housing
with a potential density of three to
20 units/acre.
3-20 units/acre
66 - 331 workers 2
2020
(1998)
OFC - Office C – Commercial
Areas designated for a broad range
of retail shopping and services to
meet the needs of the community.
Compatible uses such as office
buildings are also intended for this
area.
20 - 480 workers 3
The area is also subject to the Guiding Plan for the B-2 District (2008) which was developed to
create a long-term redevelopment plan for the area. The guiding principles for that plan included
the following:
• Place: Create a visual impression that the B-2 District is a distinct, identifiable and
• special place in Arden Hills.
• Land Uses: Allow and encourage a variety of land uses in the district potentially
including retail and service businesses, offices, high-density housing, places to eat and
drink, industry that has high employment density and attractive buildings, education
and indoor recreation.
• Intensity and Scale: As redevelopment occurs, generally increase the height of the
buildings and amount of each site they cover.
• Local: Create a district that serves the needs and desires of residents of Arden Hills.
• Quality: Ensure that all private and public improvements are of a high quality in terms
of appearance, function and longevity.
1 U.S. Energy Information Administration Summary Table B2 Building Characteristics (2018). Accessed June 25,
2026.
2 U.S. Energy Information Administration Summary Table B2 (2003). Accessed June 25, 2026.
3 U.S. Energy Information Administration Buildings Characteristics (1995). Accessed June 25, 2026.
Page 6 of 7
• Civic: Communicate that the district is “everybody’s neighborhood” and a center of
public life in Arden Hills (a distinction perhaps to be shared with the redeveloped
TCAAP site) through the use of public plazas or open space, small private spaces usable
by the public, improved sidewalks and streetscape.
• Movement: Provide for safe and efficient auto movement as land use intensifies but
also greatly improve the environment for pedestrians and bicyclists.
• Green: Provide year-round greenery and color throughout the district through generous
landscaping of private sites and the public street edges. Add one or more green
gathering spaces in the corridor. Improve the public’s use of the Country Insurance
woods, its intended purpose.
• Role of the City: Establish the primary role of the City in the district as planning,
leadership, zoning and public improvements. Do not rule out the application of
municipal financial assistance in land redevelopment.
• Continuity: Maintain long-term support for the principles and policies of the Guiding
Plan for the B2 District throughout the entire Arden Hills family including elected and
appointed officials and staff.
• Environmental Conservation and Sustainability: Promote the use of green building
practices, sustainability, and energy conservation to reduce the environmental impact
of new development and redevelopment.
Guiding Plan for the B-2 District Study area
Page 7 of 8
2. Zoning Code Amendments
Municipal zoning codes are regulations adopted by ordinance through which the policy
directions and land use goals in the Comprehensive Plan are implemented. The zoning code
must not conflict with the adopted Comprehensive Plan and for this proposed project a
related change to the zoning code is needed. The change to the zoning code proposed is to
amend Section 1320.06 District Requirements Chart to increase 5. Floor Area Ratio (FAR)
from 0.8 to 1.0 in the B-2 District and 9. PUD & SUP Maximum Dwelling Unit Density
Per Net Acre from 20 units to 25 units, shown below.
Requirement B-2 District Standards as existing
and proposed
Maximum Floor Area Ratio 0.8 1.0
PUD & SUP Maximum Dwelling Unit
Density Per Net Acre 2025 units
In addition, this project must comply with Section 1320.16 - Requirements for
Affordable Housing. The Applicant, in exchange for providing 17 units (10%) at a
rental rate that is affordable to those households making approximately 80% of the
Area Median Income, is eligible for and has requested a density bonus of 25% more
units, for a total potential number of units per acre of 30. The project as proposed has
a net density of 29.5 units per acre (167 units on a 5.66 acre site).
3. Master and Final Planned Unit Development
Section 1320.085 Special Requirements for the B-2 General Business District states that
new developments and redevelopments must follow the Planned Unit Development (PUD)
process. The Applicant has applied concurrently for Master and Final Planned Unit
Development for this project. Flexibility from established standards can be requested
through this process. The project as a multi-family residential structure requires a
Conditional Use Permit (CUP) and the Applicant has asked for flexibility through the PUD
process including modifications to the established criteria (conditions) for multi-family
buildings, described below.
2. Conditional Use Permit
A “Dwelling: multiple family” (multiple family dwelling) is a conditional use in the B-2
General Business District. City Code Section 1355.04 Subd. 3 of the Arden Hills Zoning
Code lists the general criteria for evaluating a CUP. The Planning Commission and City
Council should consider the effect of the proposed use upon the health, safety, convenience
and general welfare of the owners and occupants of the surrounding land and the
community, in general, including but not limited to the following factors:
a) Existing and anticipated traffic and parking conditions;
b) Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid
waste, and other nuisance characteristics;
c) Drainage;
d) Population density;
Page 8 of 9
e) Visual and land use compatibility with uses and structures on surrounding land;
f) Adjoining land values;
g) Park dedications where applicable;
h) Orderly development of the neighborhood and the city within the general purpose
and intent of the Zoning Code and the Comprehensive Development Plan for the
City.
City Code Section 1325.045 Multi-family Dwelling Units Additional Conditional Use
Permit Criteria establishes eight criteria specific to multi-family dwelling units:
Subd. 1 Minimum Unit Size. Efficiency units shall be a minimum of five hundred
and fifty (550) square feet; one-bedroom units shall be a minimum of seven hundred
(700) square feet; two-bedroom units shall be a minimum of nine hundred and fifty
(950) square feet; and three-bedroom units shall be a minimum of twelve hundred
(1,200) square feet. For each additional bedroom, an additional one hundred and
fifty (150) square feet is required. Garages, breezeways, common hallways,
balconies, and porch floor spaces shall not be credited in determining the required
floor area of units.
Subd. 2 Security Plan Component. A complete security plan shall be submitted at
the time of the development proposal, subject to the approval of the Ramsey County
Sheriff's Department
Subd. 3 Lighting Plan Component. A complete photometric plan shall be submitted
in compliance with the recommendations of the Ramsey County Sheriff's
Department. Compliance with this requirement shall be in addition to any
maximum lighting requirements, as described elsewhere in the City's Zoning Code.
Subd. 4 Parking. A minimum of one enclosed parking stall shall be provided per
dwelling unit. Enclosed parking structures shall be attached to at least one of the
principal structures to which parking is being provided.
Subd. 5 Common Area. Common area devoted to recreation or leisure activities
shall be provided. Common area must include a combination of both indoor and
outdoor space.
Subd. 6 Efficiency Apartments. The number of efficiency units in a multiple
dwelling shall not exceed fifteen (15) percent of the total number of apartments.
Subd. 7 Bicycle Parking. Enclosed bicycle parking shall be provided at a rate of
.5 spaces for every dwelling unit.
Subd. 8 Window coverings. All windows which are visible to the outside shall be
provided with window treatments. Window treatments shall be consistent
throughout each multi-family dwelling structure or development.
4. Site Plan Review
A site plan review is required for new development or additions in any business, industrial
or multiple family zoning districts, for PUDs, and CUPs. The applicant submitted all
Page 9 of 10
required elements for site plan review including an ownership report, a survey, all required
site plan elements as described in Appendix A of the City’s Code of Ordinances,
lighting/photometric plan, drainage plan and stormwater treatment plan, utilities plan, .
landscape plan, signage plan, building plans (90%), tree preservation plan, traffic study,
and safety plan. In addition, the applicant provided a shadow study to show the potential
impacts of the proposed building on neighboring structures for both the summer equinox
(the longest day of the year) and the winter equinox (the shortest day of the year and the
time of year when there is likely to be the least amount of natural cover/shade).
Plan Evaluation
Section 1345.04 Comprehensive Plan and Zoning Map Consistency
In the granting of conditional use permits for medium- and high-density residential uses and
business or industrial uses the council shall first find that the proposed development is in
compliance with the adopted comprehensive development plan and the Zoning Map for Arden
Hills, both in terms of the various policy statements and the site location set forth therein. If such
proposal is not in compliance with the comprehensive development plan and zoning map, a
comprehensive plan amendment and zoning map amendment application must accompany the
application for a conditional use permit.
Pursuant to the above, the Applicant has made a concurrent application for comprehensive plan
amendment, zoning map amendment and conditional use permit as evaluated below.
Comprehensive Plan Amendment Review
1. Section 6.4.10, Development Capacity and Net Residential Density
The Applicant has requested an amendment to the existing language in Chapter 6, Land
Use Section 6.4.10. The Applicant is requesting a comprehensive plan amendment to
Chapter 6 – Land Use in the 2040 Comprehensive Plan to change the density range and
Floor Area Ratio for the Community Mixed Use land use as shown:
10. Community Mixed Use (CMU) – areas designated for a broad range of retail, shopping,
services, and office space to meet the needs of the community and surrounding areas. This
area may also include high density housing with a potential density of twelve (12) to twenty
(20) thirty (30) units per acre. The expected share of uses within this area are as follows:
10% to 50% Light Industrial; 10% to 70% Retail; 10% to 70% Office; and 10% to 50%
Residential. A development intensity of up to 0.8 1.0 FAR may be allowed. (p. 6-14).
The Future Land Use designation of Community Mixed Use allows densities of 12 to 20
units per acre and a Floor Area Ratio of 0.8. A Comprehensive Plan Amendment is required
for development density and development intensity for floor area ratio.
When determining density for a proposed development net acreage for the site must be
used. Net residential acreage is calculated by subtracting wetlands, water bodies, public
parks, arterial streets, and identified natural resources that are protected by ordinance from
gross acres.
The Subject Property does not contain water bodies, public parks, arterial streets, or
identified natural resources that are protected by ordinance from gross acres but does
Page 10 of 11
include a portion of a one acre wetland/stormwater retention pond, trees, and other
vegetation in the northeast corner of the property. This area is approximately 19,000 square
feet on the site. At 20 units per acre, approximately 8.35 net acres would be required for a
167-unit development. As proposed, a Comprehensive Plan amendment to Chapter 6
Section 6.4.10, Development Capacity and Net Residential Density is required for this
development.
Density Calculation
Total Site Acreage 6.0
Total Wetland Acreage 0.44
Net Acres 5.66
Proposed Units 167
Density (Units/Net Acres) 29.5
The table below shows the existing and proposed percentages of light industrial, retail,
office and residential uses in the area guided for CMU in the 2040 Comprehensive Plan.
Existing Proposed
Land Use Square feet Percent Square feet Percent
Light Industrial 437,342 10 437,342 10
Retail 1,176,991.2 26 1,176,991.2 26
Office 2,121,372 47 1,874,822.4 42
Residential 746,618.4 17 993,168 22
Total 4,482,324 100 4,482,324 100
The proposed amendment is consistent with the intent and purpose of the adopted 2040
Comprehensive Plan. The city’s 2040 Land Use Plan Goal is to develop and maintain a
land use pattern that strengthens the vitality, quality, and character of our residential
neighborhoods, commercial districts, and industrial areas while protecting the
community’s natural resources and developing a sustainable pattern for future
development.
This application meets the adopted policies associated with the land use goal including to,
“evaluate and amend the land use regulations to achieve the highest possible development
standards, support and vital mix of land uses, and promote flexible approaches to
implement the Comprehensive Plan.” This proposal also has the potential to support
policies associated with, “preserving the stability and quality of the city’s neighborhoods
while allowing for redevelopment that is complementary to existing development.” By
adding more land dedicated to residential uses to the area guided for Community Mixed
Use this project moves the area closer to the desired share of land uses and helps to
diversify land uses to provide a balanced mix of uses.
The city’s adopted Housing Goal is, “Develop and maintain a strong, vital, diverse and
stable housing supply for all members of the community.” In the housing chapter the
following policies support this proposal:
• Promote the development of a variety of housing options by preserving and
increasing high-quality housing opportunities that are suitable for a mix of ages,
incomes and household types.
Page 11 of 12
• Encourage the incorporation of affordable and life-cycle housing into new
development and redevelopment where feasible.
• Preserve and strengthen the community’s neighborhoods to maintain a high
quality of life for residents.
As stated in the housing chapter, “…providing long-term opportunities for new housing is
important to the ongoing vitality of the community and to retaining Arden Hills’ reputation
as a highly desirable place to live.”
One component of strengthening a community’s vitality and providing stability and quality
of neighborhoods is providing sufficient supply of homes for people to live in and by
increasing the city’s overall net tax capacity. Both of these outcomes provide economic
benefit to the community at large including: local retail establishments are potentially
benefited through residents’ spending money on goods and services provided by local
establishments; property owners are more likely than not to see a potential reduction in the
overall individual property tax burden. The site has an existing taxable market value of
$2,180,600. Based on an evaluation of similar properties developed on similar sites in
suburban Ramsey County in the last four years, when redeveloped the site is more likely
than not to have an estimated taxable market value at or above $40,000,000. Increasing the
city’s net tax capacity is a key component of the Economic and Redevelopment Goal in
Chapter 8 of the Comprehensive Plan. This private development project, which seeks no
financial support, aligns with the following policies:
• Engage the private sector to encourage development and redevelopment projects
that are beneficial to the City and identify incentives or programs where applicable
that promote private sector investment.
• Capitalize on existing community strengths, such as location, freeway access, and
a well-educated population.
• Identify incentives or programs that provide housing choice.
Planning staff reviewed the proposed amendments with Metropolitan Council staff who
indicated support for the request. If approved, and after the expiration of a required 60-day
review period for adjacent jurisdictions (including but not limited to surrounding
municipalities, counties and school districts), Staff will submit the amendment to the
Metropolitan Council for review and approval.
Zoning Code Amendment Regulations Review
Section 1320 - District Provisions (B-2 General Business District)
Subd. 7. B-2 General Business District identifies the purpose of this zoning district as
intended:
• To be a place in which people can live, work and play.
• To create a compact, architecturally diverse, pedestrian- and bicycle-friendly
community with a distinct identity.
• To provide a connected sidewalk system and places for people to gather and
socialize.
• To implement design standards to promote an attractive environment with lasting
and sustainable value.
Page 12 of 13
• To group compatible retail and service business uses that tend to draw trade that
is naturally interchangeable and promotes business prosperity.
• To provide an adequate supply of businesses and professional service areas to meet
the needs of the residents.
• To minimize the effects of traffic congestion, noise, odor, glare and similar safety
problems.
• To implement the Plan known as the "Guiding Plan for the B2 District," which was
adopted by the City Council on October 27, 2008.
The Applicant has requested an amendment to the Section 1320.06 District Requirements
Chart as shown below. The Applicant states the amendments are necessary to construct the
project. Based on earlier conversations with the City Council and with the property owner
and broker, this site is highly sought after as a multi-family site given its proximity to retail,
commercial and employment uses. Office space of this type and variety has limited appeal
to the market. Densities greater than 20 units per acre also respond to market conditions
and concerns given the cost of labor, materials, construction. Since the Comprehensive
Plan and Zoning Code were adopted and/or amended since 2019 the housing market has
changed significantly. In recent history the city has considered applications for residential
densities up to 24 units per acre. In January 2024 the Council amended the city’s
Comprehensive Plan to allow up to 24 units per acre in the area east of Interstate 35W,
south of County State Aid Highway 96, west of Snelling Avenue North and north of
interstate 694. The Comprehensive Plan states that the density may be increased by up to
100% through the use of the Planned Unit Development (PUD) process if the intent is to
meet the goals of the Comprehensive Plan. For context in the City of Arden Hills overall,
the TCAAP Redevelopment Code, Master Plan and the City’s 2040 Comprehensive Plan
identify a range of allowed residential densities between 21 and 67 units per acre in the
areas guided for residential and mixed residential/commercial development at Rice Creek
Commons.
Direction 2040 Comp. Plan
Land Use Zoning Existing Land Uses
North CMU – Community
Mixed Use
B-2 – General
Business
Retail shopping center
South LDR – Low Density
Residential
R-3 – Townhouse and
Low Density Multiple
Dwelling District
Attached and detached
single-family homes
East N/A N/A Right-of-Way
(Lexington Avenue N)
West HDR – High Density
Residential
R-4 – Multiple
Dwelling District
Residential
condominiums
Conditional Use Permit Application Review
Section 1320 - District Provisions (B-2 General Business District)
Multiple family dwellings require a CUP in the B-2 district. The table below provides the
required standards for the B-2 District and the preliminary analysis for the proposed
development of the principal structure and the site. Zoning codes establish lot standards for
Page 13 of 14
a variety of reasons, including to ensure there is enough space for utility easements,
driveways, stormwater drainage; to ensure developments do not exceed the capacity of
wastewater systems; to provide keep the overall mass of buildings proportional to the land
beneath them and to minimize stormwater runoff. These metrics taken together limit the
size, scale, massing, location, and intensity of a development on a property. In considering
the feasibility of a site for multi-family development, the dwelling units per acre is the
single most important number when evaluating whether a residential project is financially
feasible.
As shown in the table, the project as proposed has a floor area ratio of 0.96, a minimum lot
area per unit of approximately 1,400 square feet and an anticipated number of units per
acre of 29.5. The Applicant has requested a zoning code amendment to allow up to 25 units
per acre in a PUD combined with the 25% density bonus for providing affordable units
established in Section 1320.16 – Requirements for Affordable Housing for a total potential
number of units per acre of 30.
Ordinance Requirements B-2 District Standards Application
Maximum Floor Area Ratio 0.8 0.96
Maximum Structure Coverage 45% 22%
Minimum Landscape Lot Area 20% 35.4%
Minimum Front Yard Setback 50 feet 50 feet
Minimum Rear Yard Setback 20 feet 50 feet
Minimum Side Yard Setback 10-20 feet 35 – 75 feet
Minimum Lot Area (per
dwelling unit) 2,178 sq. ft. ~1,400 sq. ft.
Maximum Building Height 50 feet 49 ft. 1.5 in.
PUD & SUP Maximum
Dwelling Unit
Density Per Net Acre
20 units 29.5 units
Chapter 6 outlines how the City Code includes PUD regulations that allow for higher
quality and compatible development of property by encouraging reasonable flexibility
from applicable standards, including at higher densities than would be allowed under the
underlying zoning district and/or guided land use designation.
Maximum Floor Area Ratio – Zoning Code Amendment requested.
A floor area ratio (FAR) of 0.8 is permitted within the B-2 zoning district. The proposed
development has a FAR of 0.98. Floor area ratio is a density metric like units per acre, but
it is designed to control the bulk or mass of a structure on a site. It is calculated by dividing
a building’s total floor area across all stories by the buildable area of the lot. An FAR of
Page 14 of 15
1.0 means building a total amount of floor space equal to the lot size. For example, a single
story covering the entire buildable area or two stories covering half, or three covering a
third. On a 10,000-square-foot lot with a FAR of 1.5 a 15,000 square foot building could
be constructed spread across however many stories the height limit allows. In this case,
the height limit is 50 feet, the lot is 5.66 acres of buildable area, and the FAR is 0.8.
Applicant is requesting a change in the city’s zoning code to allow for up to a 1.0 FAR.
The table below shows an example of the potential on the site given the existing FAR, the
minimum lot area per dwelling unit, the maximum building height and the total number
of units/acre possible on the site today compared with the application.
B-2 District
Standards Allowed Application
Floor Area Ratio 0.8 197.549.6 SF 249,944 SF 0.96
Minimum Lot
Area (per
dwelling unit)
2,178 sq. ft. 113 units 167 units ~1,400 sq. ft.
Maximum
Building Height
(stories)
50 feet 5 stories 4 stories 49 ft. 1.5 in.
Units 20/acre ~23/floor ~42/floor 29.5/acre
1320.085 Special Requirements for the B-2 General Business District
As described in the Zoning Code, the B-2 General Business District encompasses a primary
gateway into the City. The aesthetic and transportation impacts from new developments
and redevelopments must be evaluated to help ensure the long-term viability and success
of the B-2 District. Accomplishing the purpose of the B 2 District requires particular
concern for the design of buildings, site features (such as landscaping, lighting, and
signage), site layout, building materials, site design, and other related design elements. To
that end, new development and redevelopment shall conform to the standards in this and
related zoning requirements.
The "Guiding Plan for the B2 District" shall act as a guide for development but is not part
of the Zoning Code. The Guiding Plan is adopted as a component of the city’s
Comprehensive Plan and as such guides the decision-making process. In reviewing and
approving land use applications, the City Council shall make the final determination on the
compatibility and consistency with all provisions in this and related sections of the Zoning
Ordinance. This section of the code requires new construction, redevelopment of a site,
and significant modifications to existing sites to use the Planned Unit Development (PUD)
process. The PUD proposal shall identify any requested modifications from the applicable
zoning requirements and from the "Guiding Plan for the B2 District" as well as the reasons
why the modifications would be in the public interest and would be consistent with the
purpose of the B-2 District. The code also states that provisions in this Section may be
modified by the City Council to allow planning flexibility without the need for a variance
to encourage cooperative dialogue between the applicant and the City. The code identifies
Page 15 of 16
that the following land uses are not compatible with the stated purpose of the B-2 District
and shall be prohibited:
1. Individual retail businesses larger than 50,000 square feet except for Sports and
Fitness Clubs.
2. Open sales, rental or storage lots, including but not limited to cars, buses, trucks,
motorcycles, bicycles, recreational vehicles, trailers, boats, mobile homes,
machinery, lumber, building materials, and similar items. Approved open air garden
centers shall be exempt.
3. Mini storage facilities;
4. Tattoo parlors;
5. Consumer Small Loan establishments;
6. Outdoor bulk storage buildings, including but not limited to, forest, metal,
concrete, agricultural and petroleum products, chemicals and similar products; and,
7. Manufacturing or processing that generates hazardous waste without a valid
Hazardous Waste Generator's license from the Ramsey County Public Health
Department.
This project does not contemplate any of the above uses. Other uses allowed by right (no
conditional use permit required) in the B2-General Business District include medical
offices/clinic, sports and fitness club, indoor commercial recreation, daycare, bank, funeral
home/mortuary, restaurants and retail. Those allowed after obtaining a conditional use
permit include dog kennel, hotel/motel, micro-brewery/distiller, drive-through window.
1320.14 Planned Unit Development (PUD) Overlay District
The purpose of the Planned Unit Development (PUD) District is to promote the
development of land in a unified manner by treating the entire development as a single
entity and relaxing the strict application of standard zoning and subdivision requirements,
in exchange for a project that better forwards the goals and purpose of the City's
Comprehensive Plan. While PUD's may be allowed in any district, they are required for
some types of development in certain districts. As described above, development and
redevelopment in the B-2 District requires a PUD. Further, if a zoning change is required
to accommodate the uses or general intensity of development in the PUD, an application
for a Zoning District change shall be made concurrently with the PUD application and, if
approved, the Zoning Map shall be changed both as to the underlying zoning district and
designation as a PUD district. The Applicant has complied with this provision.
The Applicant will be required to provide either land or a cash contribution in lieu of land
dedication. The City Council determines whether the land or a fee is required. Section
11230.08 Public Use Dedications identifies the requirements. For a residential project that
has a proposed density of greater than eight units per acre, the parkland dedication required
is 20 percent of the land area or a per unit fee of $6,500 for a potential total park dedication
fee of $1,085,500.
1320.16 Requirements for Affordable Housing.
Page 16 of 17
This is a new multifamily residential development creating 20 or more dwelling units and
is therefore subject to this section of code. The Applicant has confirmed that 10% of the
units – or 17 will be affordable to those making 80% of the Area Median Income. The table
below shows the 2026 affordable rent limits for various household sizes and income levels
as established in June. For context, the Area Median Income for the entire Minneapolis-St.
Paul-Bloomington Metropolitan Statistical Area (MSA) is $131,500. This information is
based on the U.S. Department of Housing and Urban Development (HUD) area median
income (AMI) calculations.
Other options for developments subject to this section are shown below:
Options
(Choose one)
Affordability
Standard
Maximum
Household Income
Minimum % of
Units
1 Ext. low income 30% AMI 5%
2 Very low income 50% AMI 5%
3 Low income 60% AMI 7.5%
4 Workforce housing 80% AMI 10%
There are provisions associated with parking, unit location and integration and design
standards. The Applicant has indicated all those provisions will be met within the
development as proposed.
To offset the costs of providing affordable housing without public subsidy, developments
meeting the requirements of this section are eligible for regulatory incentives. In this case
the Applicant has requested a Density Bonus as provided in this code section. The
Applicant may also qualify for a reduction in the minimum lot size of 25%. That would
allow for a minimum lot size of 1,633.5 square feet. The Applicant has requested a
minimum lot size of approximately 1,400 square feet.
Section 1325.045 Multi-family Dwelling Units Additional Conditional Use Permit Criteria
Subd. 1 Minimum Unit Size – Flexibility requested
The City Code sets minimum unit size based on the type of unit within the multi-family
dwelling. The Applicant is proposing one- two- and three-bedroom units. One-bedroom
Page 17 of 18
units must be a minimum of 700 square feet, two- bedroom units must be a minimum of
950 square feet, and three-bedroom units must be a minimum of 1,200 square feet.
The Applicant proposes a minimum unit size of 663 square feet for one-bedroom units,
not to exceed 20% of the units in the building. Other unit sizes meet or exceed the
minimum requirements listed above.
The Applicant is requesting a modification of Subd. 1 Minimum Unit Size for a portion of
the one-bedroom units. The minimum one-bedroom unit size is 700 square feet, and the
proposal includes 32 units (19% of the total number of units or 46% of the one-bedroom
units) at 663 square feet.
Subd. 2 Security Plan – Under Review
The Applicant has included a detailed security plan in the application. The Ramsey County
Sherrif’s Office is reviewing the security plan. Security will include surveillance cameras
in common areas, exterior areas, surface lots, and underground garages. Controlled access
will be used for entrances into the building. Exterior portions of the site will be illuminated
through the fixtures shown on the lighting plan.
Subd. 3 Lighting Plan Component
Lighting meets the standards within Section 1325.05.
Subd. 4 Parking – Flexibility requested
A minimum of one enclosed parking stall shall be provided per unit. Enclosed parking
structures shall be attached to at least one of the principal structures to which parking is
provided. Parking is reviewed below along with the request to modify the requirement
for a 1:1 ratio of units to enclosed parking spaces established in the City Code.
Subd. 5 Common Area
Common area devoted to recreation or leisure activities shall be provided. Common area
must include a combination of both indoor and outdoor space. The Applicant lists features
and amenities in the narrative that are both indoor and outdoor. These include an indoor
community room and an outdoor patio and pool, an area for dogs to exercise, playground
equipment, and pickleball courts.
Subd. 6 Efficiency Apartments
The number of efficiency units in a multiple dwelling shall not exceed fifteen (15) percent
of the total number of apartments. No efficiency apartments are proposed.
Subd. 7 Bicycle Parking
Enclosed bicycle parking shall be provided at a rate of 0.5 spaces for every dwelling unit.
Bicycle parking is reviewed above. The applicant is providing 150 bicycle parking stalls
for a ratio of 0.9 stalls per unit.
Subd. 8 Window Coverings
All windows which are visible to the outside shall be provided with window treatments.
Window treatments shall be consistent throughout each multi-family dwelling structure
or development. The Applicant has stated an intent to comply with the provision
Page 18 of 19
requiring window coverings. Compliance with the requirements for window coverings
will be done as part of an inspection of the building once construction has begun.
Section 1325.05 - Design Standards
The Applicant has provided information that demonstrates the design standards for
landscaping, drainage, wetlands, and flood plain, lighting, and screening are met.
Subd. 8 Additional Design Standards for New Development, Redevelopment, and
Modifications to Existing Sites in the B-2 and B-3 Districts
Additional design standards are applied to projects proposed in the B-2 and B-3 districts.
The purpose of these additional design standards is to promote a high level of
architectural, landscaping, and site design in the business districts of Arden Hills. The
City seeks to create a unified, harmonious, and high-quality environment to foster a
distinct, positive, and successful image for the City.
Buildings within the B-2 zoning district are subject to requirements regarding exterior
materials. Section 1325.05 Subd. 8 Additional Design Standards for New Development,
Redevelopment, and Modifications to Existing Sites in the B-2 and B-3 Districts establish
additional design standards to promote a high level of architectural, landscaping, and site
design in the business districts of Arden Hills. The city seeks to create a unified,
harmonious, and high-quality environment to foster a distinct, positive, and successful
image for the city. Established in the code are standards for exterior materials, building
design, window and door openings, building color, fences, site furnishings and seating
areas, screening, landscaping, parking, a requirement to provide a traffic study, lighting,
pedestrian and bicycle circulation and bicycle parking and a drainage/water management
plan. The code also states that the city encourages the use of green materials and
environmentally friendly construction and site design such as the use of pervious
surfaces, green rooftops, energy efficient materials, LEED standards, and other green
building techniques. The code does not require these actions.
The Applicant is proposing a mix of brick veneer, castfit stone, fiber cement panels,
vertical metal siding, wood tone fiber cement lap siding, vinyl patio doors and windows,
and metal accent features. Approximately 30% of the façade materials facing a public
street are shown as windows/glazing. The first floor is distinct from others as described
in the design standards. At least 75% of the exterior building materials are of brick
masonry, tile masonry, natural stone (or synthetic equivalent), decorative concrete plank,
transparent glass or any combination thereof. The plans do not include any EIFS or stucco
on any façade. The table below evaluates the building design standards and landscaping
standards, as evaluated later in the report.
Design standard B-2 District Standards Proposed Development
“Enduring timeless and well-detailed:
exterior materials 75% 75%
EIFS At least 12 feet above ground Not proposed
Front setback location 50% of building at front
setback 50 feet
Façade articulation 20-40 feet 20-40 feet
Residential façade transparency 20% facing public street 30%
Bright/contrasting colors 5% maximum 4% (white)
Page 19 of 20
Design standard B-2 District Standards Proposed Development
Landscaping - Planting Islands 10% of parking area 11% of parking area
Landscaping – Tree Mitigation 458.7 caliper inches required
for replacement
808.75 caliper inches
proposed for replacement
Landscaping – Boulevard and Island
Trees
Boulevard Trees – 38
Island Trees – 14
Boulevard Trees – 38,
Existing Vegetation
Island Trees – 24
Pedestrian and Bicycle Circulation Provide circulation plan and
bike rack
Bicycle parking provided
for residents 0.9 bike spaces
per unit
The Zoning Code requires that direction of lighting to be arranged away from adjoining
lots and public streets, that lighting sources be concealed or hooded, and intensity of
lighting any light or combination of lights shall not cast light that exceeds a meter reading
of one foot candle on the travel lanes of adjoining public streets or 0.4 foot candles on
adjoining residential property. For non-residential uses visible from residentially zoned
property, the Code limits lighting to a maximum of 25% percent of the facade visible
from such residential property to be illuminated by direct lighting from spotlights or flood
lights.
The proposed lighting plan includes wall mounted building lighting, flush-mounted
lights, and light poles that are downward cast with 90-degree cut offs. The Applicant is
also proposing pole lights placed throughout the parking lot. The Applicant has submitted
a photometric plan that shows the submitted lighting package is consistent with the City
Code.
Section 1325.055 - Tree and Landscaping Preservation
Arden Hills has a commitment to environmental sustainability and development that
preserves and enhances the community through tree preservation and mitigation
strategies. The submitted Tree Preservation and Landscaping plans are evaluated below.
Subd. 2. Tree Preservation Plan
The proposed site plan shows a landscaped area of 87,324.6 square feet, 35.4 percent of
the Subject Property. Landscaped area will consist of ponding areas, tree, grass, and shrub
plantings as well as rock mulch, all of which are permitted types of landscaping. Section
1320.06 – District Requirements Chart requires all uses in the B-2 Zoning District
maintain a minimum landscaped area of 25 percent and the proposed exceeds this
requirement.
Of the total landscaped area, the Applicant proposes to plant 9,888.63 square feet, 11.3
percent, with perennials and/shrubberies. Section 1325.05 – Design Standards requires at
least 10 percent of the total landscaped area shall be covered with perennials and/or
shrubbery and the proposed complies.
In parking lots, planting islands are required to break up expanses of hard-surface parking,
identify rows of parking, and provide safe and efficient traffic movement. The landscaping
plans show 17 parking islands which occupy 6,974.05 square feet of the 59,482.94 square
foot parking area. At 11.7 percent, the proposed parking island area meets the requirement.
Twenty-one trees are proposed within the parking islands, although some parking islands
do not include a tree. Section 1325.05 requires planting islands to be edged with concrete
Page 20 of 21
curbs, be a minimum of 150 square feet in area, and include at least one tree. The Planning
Commission may consider if the proposed plans meet these minimum requirements or if
flexibility is required for the proposed distribution of parking island trees.
Section 1325.055 – Tree and Landscaping Preservation permits up to 10 percent of
existing significant trees to be removed without requiring replacement. For significant
trees removal above the permitted 10 percent, caliper inches shall be replaced at a ratio of
one new caliper inch for every two caliper inches removed. Staff reviewed the Applicant’s
plans and found they propose to remove 1,055.08 caliper inches of 1,376.3 caliper inches
of existing significant trees, meaning the Applicant is responsible for mitigation of 917.45
caliper inches removed above 10 percent. The Applicant intends to plant the 487.5 caliper
inches required based on the total inches removed and the rate of replacement. The
proposed tree mitigation plan exceeds the minimum requirement of 458.7 caliper inches
replacement trees.
The Applicant is also subject to a minimum caliper inch requirement of one caliper inch
per 320 gross square footage of all floors of the building and a percentage of trees of
various caliper inches given the building height. The landscaping plans show 321.25
caliper inches of existing trees will remain, and 487.5 caliper inches of new trees in line
with the required percentages will be planted, for a total of 808.75 caliper inches on the
site. With a building gross square footage of 190,094 square feet, the Applicant is required
to show at least 619 caliper inches, which the plans address.
The minimum tree size at time of planting shall be 2.5 caliper inches for deciduous trees
and the percentage of trees planted of various caliper inches shall meet the requirements
of the table provided. The landscaping plan currently states trees ranging from 2.5 caliper
inches to 4.5 caliper inches will be planted on the site.
The landscape plan notes the Applicant proposes to plant 30 trees along the Subject
Property’s street frontage, which includes 586.6 feet of frontage along Harriet Avenue and
445.7 feet Lexington Avenue. Staff found that 29 trees are shown as proposed along the
frontage. Section 1325.05 – Design Standards requires a minimum of one tree be provided
along the right-of-way for every 50 feet of public street frontage, with new developments
in the B-2 Zoning District requiring a minimum of one tree for every 40 feet of public
frontage. A minimum of 26 trees would be required for the property’s frontage, and the
proposed 29 trees would exceed this requirement.
The minimum tree size at time of planting shall be 2.5 caliper inches for deciduous trees
and the percentage of trees planted of various caliper inches shall meet the requirements
of the table provided. The landscaping plan currently states trees of two caliper inches will
be planted on the site.
The submitted plans show plantings within drainage and utility easements. These
plantings must be moved outside of the easements.
The City Code requires a minimum of one tree be provided along the right-of-way for
every 50 feet of public street frontage. The Subject Property survey shows the northern
property along County Highway 96, Snelling Avenue North, and State Highway 10. Both
the frontages along County Highway 96 and Snelling Avenue North are heavily vegetated.
Page 21 of 22
Additional frontage along State Highway 10 is currently less vegetated and will be
impacted by construction. The Applicant is proposing 38 trees along 398 feet of abutting
right-of-way that will be disturbed.
Section 1325.06 Requirements for Parking, Loading, and Circulation & Section
1325.07 Performance Standards– Flexibility Requested
Requirements for Parking, Loading, and Circulation in Section 1325.06 and the
Performance Standards in Section 1325.07 are met; however flexibility has been requested
regarding the number of required enclosed parking stalls as evaluated below. Based on
comments received from the public additional detail is provided for the performance
standards associated with the traffic study and site circulation and pedestrian and bicycle
circulation.
Section 1325.06, establishes the number of required parking spaces. Multiple family
dwellings require 1.1 per efficiency and 1 bedroom dwelling units and 2 for each 2+
bedroom dwelling unit. In addition to these standards, multiple family dwellings that
require a CUP shall provide a minimum of one enclosed parking stall per dwelling unit.
Enclosed parking structures shall be attached to at least one of the principal structures to
which parking is provided. With 167 units, the multiple family dwelling is required to
provide 273 stalls and 167 of those stalls must be in an enclosed parking structure that is
attached to the principal structure.
The Applicant is proposing 300 parking stalls for the multifamily dwelling use, 148 of
which would be located in the underground parking facility.
Units Unit
Counts
Required
Stalls
Number of
Stalls Provided
by Units
Total
Number
of Stalls
Provided
Parking
Surplus
1-bedroom units
(1.1 stalls) 69 76 76
300 +28 2 or more
bedrooms
(2 stalls)
98 196 196
Total 167 272 272
The Applicant has requested modification of the requirement to provide one enclosed
parking stall per dwelling unit.
Unit count Enclosed Stalls
Required
Enclosed Stalls
Provided
Flexibility
requested
167 167 148 -19 enclosed
Page 22 of 23
Traffic Study and Site Circulation – Under Review
The applicant provided a third-party traffic study (Attachment G). The traffic study
demonstrates that there will be no markedly different traffic generated by the site from the
existing condition and identifies ways to ensure the change to the site layout are sensitive
to potential neighborhood concerns. Draft conditions of approval are included for the
Commission’s consideration. At the time of writing this report, the application is still
under review of the Public Works Director/City Engineer as well as Ramsey County. If
comments were received regarding the traffic study, city staff may recommend
incorporating additional conditions.
Pedestrian and Bicycle Circulation – Meets Requirements
The Applicant has stated that this project will include sidewalks around the proposed
apartment building. A sidewalk will be extended along the southern property line on
Harriet Avenue and will extend north on Lexington Avenue to meet with the existing
sidewalk. Additional sidewalks will be installed to facilitate a pedestrian connection to the
Arden Plaza shopping center to the north in addition to sidewalks internal to the site.
The Applicant is proposing bicycle parking as part of this development within the
underground parking. City Code requires multifamily dwellings that require a CUP to
provide enclosed bicycle parking at a rate of 0.5 spaces for every dwelling unit, for a total
of 83.5 required stalls. The submitted plans and narrative state that bicycle parking will
be provided at a rate of 0.91 spaces per unit for a total of approximately 152 bicycle
parking spaces which exceeds the requirement for bicycle parking.
Freestanding Signs - Meets Requirements
The Subject Property is in Sign District 5. Properties in Sign District 5 are allowed to have
one freestanding sign with 100 square feet in copy area and not exceeding 16 feet in
height. Freestanding signs shall be located at least five feet from any property line. Sign
copy area is defined as the area in square feet of the smallest rectangle, circle, or triangle
that contains the sign copy. Signs in Sign District 5 may be externally, internally, or
backlit. The sign proposed in the Applicant’s materials meets these requirements.
Procedural Requirements for Specific Applications – Section 1355
The following applications requiring a public hearing are considered within this staff report as
evaluated above:
A. Amendment to the Zoning Code regulations
B. Conditional Use Permit for a Conditional Principal Use
C. Planned Unit Development
D. Comprehensive Plan Amendment
The Applicant also applied for Site Plan Review. Site Plan Reviews do not require a public
hearing.
A public hearing is required before the request can be brought before the City Council. The
applicant or its representative shall be given the opportunity to appear before the Planning
Commission to answer questions or give explanations regarding the proposal. Upon completion
of the public hearing and its study and consideration of the application, the Planning Commission
Page 23 of 24
shall submit its written report, containing its findings, conclusions, and recommendations as to
the application, to the City Council.
Notice was published in the Pioneer Press on June 26, 2026. Notice was prepared by the City and
mailed to property owners within 1,000 feet of the subject property.
The public hearing will be held before the Planning Commission in accordance with Section
1355.01 Procedure for Public Hearings Subd. 4 Public Hearing by Planning Commission. The
City Council may hold additional hearings. Comprehensive Plan Amendments require four
affirmative votes of the City Council.
Plan Evaluation Summary
The table below provides the performance standards for the B-2 District and the preliminary
analysis for the proposed development. Requirements where the submitted plans are inconsistent
with City Code and require revision are highlighted in grey. Requirements where the Applicant
has requested flexibility are highlighted in orange:
Ordinance Requirements B-2 District Standards Proposed Development
Minimum Lot Area
(per dwelling unit) 2178 sq. ft. 246,549.60 sq. ft.
1476.35 sq. ft.
Maximum Floor Area Ratio 0.8 0.98
Maximum Building Height 50 feet 49.5 feet
Maximum Structure Coverage 45% 22%
Minimum Landscape Lot Area 25% 35.4%
Minimum Front Yard Setback 50 feet 50 feet
Minimum Rear Yard Setback 50 feet 50 feet
Minimum Side Yard Setback 10 feet (min)/20 feet (total) 35 feet/ 75 feet
Front Setback Location 50 feet (min) ~160 feet
PUD & SUP
Maximum Dwelling Unit
Density Per Net Acre
20 units 29.5 units
Minimum Unit Size
1-BR = 700 sf min
2-BR = 950 sf min
3-BR = 1,200 sf min
+150 SF for each additional BR
1-BR = 663 sf
2-BR = 994 sf
3-BR = 1,311 sf
Minimum Parking Requirements
(Dwelling, multiple family)
1.1 per efficiency and 1 bedroom
dwelling units; 2 for each 2+
bedroom dwelling units
(Total Required- 272 spaces)
300 stalls
Enclosed Parking 1 per unit 0.89 per unit
Lighting
Not to exceed one foot candle on
the travel lanes of adjoining public
streets
0.1-foot candles shown on
photometric plan
Screening/Fencing Screened from residential uses Vegetative screening along western
boundaries
Landscaping - Planting Islands 10% of parking area 11% of parking area
Landscaping – Tree Mitigation 458.7 caliper inches required for
replacement
808.75 caliper inches proposed for
replacement
Landscaping – Boulevard and
Island Trees
Boulevard Trees – 38
Island Trees – 14
Boulevard Trees – 38, Existing
Vegetation
Island Trees – 24
Pedestrian and Bicycle Circulation Provide circulation plan and bike
rack
Bicycle parking provided for
residents 0.9 bike spaces per unit
Page 24 of 25
Additional Review
Building Official
The Building Official has reviewed the plans and has no additional comments at this time. A
Building Permit will be required prior to any construction taking place.
Public Works Director/City Engineer
The Public Works Director/City Engineer is reviewing the plans.
Fire Marshal
The Fire Marshal is reviewing the plans. No additional conditions have been included at this time
Ramsey County
Ramsey County Public Works has not yet provided comments.
Minnesota Department of Transportation
MnDOT did not provide comments at the time of writing this report.
Minnesota Department of Natural Resources
DNR did not provide comments at the time of writing this report.
Findings of Fact
Comprehensive Plan Amendment, Zoning Code Amendment, and Planned Unit Development and
Conditional Use Permit Findings:
1. The property located at 3499 Lexington Avenue is guided for Community Mixed Use in
the 2040 Comprehensive Plan (2019, as amended).
2. The property located at 2499 Lexington Avenue is subject to the provisions in the adopted
Guiding Plan for the B2 District (2008).
3. The proposed project is for 167 units of market-rate rental housing on 5.66 acres of land
for a net density of 29.5 units per acre and a Floor Area Ratio (FAR) of 0.96.
4. Community Mixed Use has a maximum net density of 20 units per acre and an FAR of 0.8.
5. The Applicant has applied for a Comprehensive Plan Amendment to increase the maximum
net density for Community Mixed Use to 30 units per acre.
6. The requested density and related FAR increase is consistent with the policy provisions
adopted in the City’s 2040 Comprehensive Plan.
7. The property located at 3499 Lexington Avenue is zoned B-2 General Business District.
8. Residential projects located in the B-2 General Business District The maximum permitted
density in the B-2 General Business District is 20 units per acre if a proposed project uses
the PUD process.
9. The Applicant has applied for a zoning code amendment to allow up to 25 units per acre if
a proposed project uses the PUD process.
10. The zoning code amendment is consistent with the comprehensive plan and is consistent
with the purpose statement for the B-2 General Business District.
11. New building construction or site modification identified requires the submittal of a Site
Plan Review application prior to construction.
12. For proposals for new construction and/or redevelopment of a site a PUD is required
13. The PUD process allows for flexibility within the City’s regulations through a negotiated
process with a Developer.
Page 25 of 26
14. The Applicant has applied for a Site Plan Review, Master Planned Unit Development,
and a Conditional Use Permit, in order to construct a 167-unit market-rate apartment
building.
15. The Applicant has proposed a Master Planned Unit Development for the development of
one approximate 249,944 square foot multiple family dwelling on the Subject Property.
16. The Master Planned Unit Development generally conforms to the requirements of the
City Zoning Code and design standards.
17. Where the plan is not in conformance with the City Code, the Applicant has requested
flexibility.
18. A public hearing for a Comprehensive Plan Amendment, Zoning Code Amendment,
Master Planned Unit Development, Final Planned Unit Development and Conditional
Use Permit request is required before the request can be brought before the City Council.
Options and Motion Language
Staff have provided the following options and motion language for this case. The Planning
Commission should consider providing additional findings of fact as part of the motion to support
a recommendation.
• Recommend Approval with Conditions: Motion to recommend approval of Planning Case
26-009 for a Comprehensive Plan Amendment, Zoning Code Amendment, Master Planned
Unit Development, Final Planned Unit Development, Conditional Use Permit, and Site
Plan Review for a Multiple Family Dwelling at 3499 Lexington Avenue N, based on the
findings of fact and the submitted plans, as amended by the conditions in the July 8, 2026,
Report to the Planning Commission:
1. The project shall be completed in accordance with the submitted plans as amended by
the conditions of approval. Any significant changes to these plans, as determined by
the Community Development Director shall require review and approval by the
Planning Commission and City Council.
2. The Conditional Use Permit and Master Planned Unit Development shall expire one
year from the date of City Council approval unless a building permit has been
requested or a time extension has been granted by the City Council. The City Council
may extend the expiration date of such approval upon written application by the
person to whom the approval was granted.
3. A violation of any condition set forth in the permit shall be a violation of this Code
and shall be cause for revocation of the permit.
4. Prior to the release of the Final Planned Unit Development for recording, the
Applicant shall enter into a Development Agreement.
5. The Final PUD shall be recorded prior to the issuance of a building permit.
6. A Master and Final PUD Development Agreement shall be prepared by the City
Attorney and subject to City Council approval for the Development. The Master and
Final PUD Development Agreement shall be fully executed prior to the issuance of
building permits. Prior to the issuance of a building permit, a landscape financial
security equal to 125% of the cost of the landscaping to be installed on the site shall be
submitted. The Applicant must submit a detailed cost estimate for the landscaping so
staff can determine the final amount. Landscape financial security shall be held for two
full growing seasons. For any landscaping that is not in accordance with the approved
landscaping plan at the end of two growing seasons, the Developer shall replace the
material to the satisfaction of the City before the guarantee is released. Where this is
Page 26 of 27
not done, the City, at its sole discretion, may use the proceeds of the performance
guarantee to accomplish performance.
7. A Grading and Erosion permit shall be obtained from the city’s Engineering Division
prior to commencing any grading, land disturbance or utility activities. The Applicant
shall be responsible for obtaining any permits necessary from other agencies, including
but not limited to, MPCA, Rice Creek Watershed District, MnDOT and Ramsey
County (i.e., ROW or access) prior to the start of any site activities.
8. The final plans shall be subject to approval by the City Engineer, Building Official,
and Fire Marshal prior to the issuance of a grading and erosion control permit and
shall be consistent with the memorandum from the City Engineer.
9. Prior to issuance of a building permit, the final plans shall show that landscaping will
not inhibit clear sight lines into and out of the property.
10. Final landscaping plans shall be revised to relocated trees outside of any drainage and
utility easements and shown with trees with a minimum caliper inch of 2.5 inches.
11. Final grading, drainage, utility, and site plans shall be subject to approval by the
Public Works Director, City Engineer, and Community Development Director prior
to the issuance of a grading and erosion control permit or other development permits.
12. Upon completion of grading and utility work on the site, a grading as-built and utility
as-built shall be provided to the City for review.
13. Heavy duty silt fence and adequate erosion control around the entire construction site
shall be required and maintained by the Developer during construction to ensure that
sediment and storm water does not leave the project site.
14. The Applicant shall be responsible for protecting the proposed on-site storm sewer
infrastructure and components and any existing storm sewer from exposure to any and
all stormwater runoff, sediments and debris during all construction activities.
Temporary stormwater facilities shall be installed to protect the quality aspect of the
proposed and existing stormwater facilities prior to and during construction activities.
Maintenance of any and all temporary stormwater facilities shall be the responsibility
of the Applicant.
15. All light poles, including base, shall be a maximum of 25 feet in height and shall be
shoebox style, downward directed, with high-pressure sodium lamps or LED and
flush lenses.
16. All rooftop or ground mounted mechanical equipment shall be hidden from view with
the same materials used on the building in accordance with City Code requirements.
17. A separate sign permit shall be required for all signs on the site.
18. Any future trash enclosures shall utilize gates and be constructed on three sides using
the same materials and patterns used on the building. Locations shall be approved by
the Planning Department.
19. The Applicant shall be financially responsible for all applicable water and sanitary
charges. Rates applied shall be memorialized in the Development Agreement.
20. All disturbed boulevards shall be restored with sod. All areas of the site, where
practical, shall be sodded or seeded and maintained. The property owner shall mow
and maintain all site boulevards to the curb line of the public streets.
21. A right-of-way permit shall be required for work performed within the City and/or
Ramsey County right-of-way.
22. The proposed structure shall conform to all other regulations in the City Code.
• Recommend Approval as Submitted: Motion to recommend approval of Planning Case 26-
009 for a Comprehensive Plan Amendment, Zoning Code Amendment, Master Planned
Page 27 of 27
Unit Development, Conditional Use Permit, and Site Plan Review for a Multiple Family
Dwelling at 3499 Lexington Avenue N, based on the findings of fact and the submitted
plans, as amended by the conditions in the July 8, 2026, Report to the Planning
Commission.
• Recommend Denial: Motion to recommend denial of Planning Case 26-009 for a
Comprehensive Plan Amendment, Zoning Code Amendment, Master Planned Unit
Development, Final Planned Unit Development, Conditional Use Permit, and Site Plan
Review for a Multiple Family Dwelling at 3499 Lexington Avenue N, based on the findings
of fact and the submitted plans, as amended by the conditions in the July 8, 2026, Report
to the Planning Commission: findings to deny should specifically reference the reasons for
denial and why those reasons cannot be mitigated.
• Table: Motion to table Planning Case 26-009 for a Comprehensive Plan Amendment,
Zoning Code Amendment, Master Planned Unit Development, Final Planned Unit
Development, Conditional Use Permit, and Site Plan Review for a Multiple Family
Dwelling at 3499 Lexington Avenue N, based on the findings of fact and the submitted
plans, as amended by the conditions in the July 8, 2026, Report to the Planning
Commission: a specific reason and information request should be included with a motion
to table.
Public Comments
The city received several public comments regarding this case (Attachment K). Additional
comments received between now and 4 p.m. on Wednesday, July 8, 2026, will be provided at the
meeting.
Deadline for Agency Actions
The City of Arden Hills received the completed application for this request on June 24, 2026. The
deadline for action on this application is August 23, 2026 (60 days), unless the city provides the
petitioner with written reasons for an additional 60-day review period.
Attachments
A. Land Use Application
B. Applicant Narrative
C. Architectural Plans/Renderings
D. Civil and Landscape Plans
E. Survey
F. Stormwater Management Plan
G. Traffic Study
H. Lighting Plan
I. Tree Survey
J. Developer Response to comments
K. Public Comments (to City as of July 2, 2026)
L. Guiding Plan for the B-2 District (2008)
ALTA survey
Shane LaFave
2 Carlson Pkwy N #400, Plymouth, MN 55447
763.300.1861
Shane@roerscompanies.com
Applicant Written Statement / Narrative
3499 Lexington Avenue North, Arden Hills, MN | PC 26-009
Roers Companies | Submitted to City of Arden Hills
I. Comprehensive Plan Amendment
A. Existing Plan Language and Proposed New Language
The City of Arden Hills Comprehensive Development Plan currently designates the
subject property at 3499 Lexington Avenue North for Community Mixed Use. As
described on page 6-14 of the Comprehensive Plan, Community Mixed Use guided
properties may contain commercial uses and residential uses. While the future land use
designation and associated plan policies do expressly contemplate higher-density multi-
family residential development on this parcel, . Under item 10, on page 6-14 of the
Comprehensive Plan the maximum permitted density for multi-family development is 20
dwelling units per acre with a maximum FAR of 0.8. We request an amendment to item
10, on page 6-14 of the Comprehensive Plan Amendment to increase the allowable
density from up to 20 dwelling units per acre to up to 30 dwelling units per acre and an
increase to the Floor Area Ratio from 0.8 to 1.0.
Roers Companies requests a Comprehensive Plan Amendment to modify the language
in the land use plan to allow for an appropriately scaled multi-family residential use, either
as a standalone designation or as a mixed/integrated use within the commercial corridor
along Lexington Avenue North. The proposed amendment would be consistent with the
overarching goals of the plan to redevelop locations well served by transportation
infrastructure and in proximity to neighborhood services and retail. The requested
language would address two related development standards in the Zoning Code in
Section 1320.06 District Requirements Chart: FAR and residential density. This request
is discussed later in this narrative.
B. Purpose and Need for the Proposed Change
The proposed amendment responds to demonstrated market need and evolving
community priorities. Arden Hills has historically had a significantly smaller share of multi-
family housing than surrounding communities: the Comprehensive Plan itself notes that
multi-family units comprise only 10.5 percent of the city's housing stock, compared to 32
percent in Ramsey County and 26 percent across the seven-county metro area. The
same plan identifies limited housing turnover and high property values as barriers for
younger households and workforce-age residents seeking to relocate to Arden Hills.
The subject site, located near the intersection of Lexington Avenue North and I-694, is
one of the most transit- and access-rich locations in the city. Its proximity to commercial
services at the adjacent Arden Plaza shopping center, regional roadways, and pedestrian
infrastructure makes it ideally suited for residential integration. The proposed amendment
acknowledges this locational advantage and aligns the plan with contemporary best
practices in mixed-use corridor planning, site design, and an efficient and economical
approach to the use of the 5.66 acre site.
C. Why the Change Is in the Public Interest
Approving the Comprehensive Plan Amendment is in the public interest for the following
reasons:
• Housing Supply: The amendment enables additional market-rate and rent
restricted rental housing in an under-served product type, helping to diversify
Arden Hills' housing stock and improve affordability through increased supply.
• Demographic Balance: The Comprehensive Plan identifies a 32 percent decline
in the 25–34 age cohort between 1990 and 2000. Multi-family rental housing is
the primary product type that attracts and retains this demographic, and the
amendment directly supports the plan's goal of rebuilding age diversity.
• Connectivity and Active Living: The development will add a sidewalk along
Lexington Avenue North and a looped pathway connecting to Arden Plaza,
advancing active living principles outlined in Sections 4.1 and 4.2 of the
Comprehensive Plan.
• Efficient Land Use: Residential intensification of a commercially designated
parcel along a major arterial represents an efficient use of urban land and
existing public infrastructure, consistent with regional sustainability goals.
D. Consistency with the City's Comprehensive Development Plan
The proposed amendment is consistent with the City's Comprehensive Development Plan
in the following respects. The plan recognizes a need to expand and diversify the city's
housing stock and specifically identifies younger households and workforce residents as
underserved segments. The amendment is also consistent with the plan's transportation
and connectivity goals, as the development will invest in sidewalk and pathway
infrastructure that closes existing gaps along Lexington Avenue North. Finally, the plan's
commercial district policies support land uses that generate activity and vitality, and a
well-designed residential community adjacent to Arden Plaza advances this intent by
increasing foot traffic and residential population proximate to existing retail.
E. Criteria Under Section 1355.04 Subd. 2 – Zoning Code
changes/Comprehensive Plan
The applicant respectfully submits that the following considerations support approval
under Section 1355.04 Subd. 2:
• The proposed amendment is consistent with the general purpose and intent of
the Zoning Code, which seeks to accommodate a range of land uses appropriate
to their locations. Multi-family residential use is permitted by conditional use in
the B-2 district, and the amendment formalizes the plan's support for this use at
this location.
• The modification from the adopted Comprehensive Development Plan is in the
public interest because it directly responds to identified housing deficiencies,
supports demographic diversity, and generates infrastructure improvements that
will benefit the broader community.
• The proposed change is compatible with surrounding land uses. The site is
bounded by commercial uses to the south and west, and the proposed
development will include screening, landscaping, and design elements that buffer
the residential use from adjacent commercial activity.
II. Conditional Use Permit
A. Intent and Purpose of the B-2 General Business District
Multi-family residential development requires a Conditional Use Permit in the B-2 General
Business District. Roers Companies submits that the proposed development meets the
intent and purpose of the district, as addressed below.
a. To be a place in which people can live, work, and play.
The proposed development at 3499 Lexington Avenue North is designed precisely to
advance this goal. The site will provide 167 market-rate apartments, bringing residents
directly into the commercial corridor. These residents will patronize surrounding
businesses, animate the streetscape, and contribute to a more vibrant environment along
Lexington Avenue. Indoor amenities including a community room, fitness center, sauna,
frost locker, locker room, lounge, work from home space, 2nd floor sky lounge and golf
simulator, combined with outdoor amenities such as a pool, pickleball courts, patio, and
playground, create a living environment where people can live and play on-site.
b. To create a compact, architecturally diverse, pedestrian- and bicycle-friendly
community with a distinct identity.
The development is designed as a cohesive, architecturally distinctive community that
complements the surrounding commercial context. The building design will incorporate
varied massing, high-quality exterior materials, and architectural treatments that create
visual interest and a distinct identity for the site. The project includes enclosed bicycle
parking at a rate of 0.91 spaces per dwelling unit, a looped pedestrian pathway connecting
to Arden Plaza, and new sidewalk infrastructure along Lexington Avenue North, directly
advancing the pedestrian- and bicycle-friendly objectives of the district.
c. To provide a connected sidewalk system and places for people to gather and
socialize.
The project will construct a new concrete sidewalk from the intersection of Harriet Avenue
and Lexington Avenue North extending north to the existing sidewalk and along Harriet
Avenue, closing an existing gap in the pedestrian network. On-site, a looped pathway will
connect residents to Arden Plaza and surrounding uses. The outdoor amenity areas,
including a 1,600–2,300 square foot patio with grills, seating, and fire pits, a pool deck,
and a yard game area, provide multiple dedicated gathering spaces for residents and
their guests.
d. To implement design standards to promote an attractive environment with
lasting and sustainable value.
Roers Companies is committed to design quality and long-term stewardship of this
property. The project will comply with the City's design standards under Section 1325.50,
and the applicant will submit detailed architectural plans, material specifications, and
exterior color palettes as part of the application package. The development is intended to
be a lasting community asset that enhances the visual character of the Lexington Avenue
corridor.
e. To group compatible retail and service business uses that tend to draw trade
that is naturally interchangeable and promotes business prosperity.
By adding 167 households immediately adjacent to Arden Plaza, this development will
meaningfully expand the customer base for existing and future retail and service tenants
in the surrounding commercial district. Residents of the development will be natural,
frequent patrons of nearby businesses, creating a mutually reinforcing relationship
between the residential and commercial uses that supports the long-term commercial
viability of the corridor.
f. To provide an adequate supply of businesses and professional service areas to
meet the needs of residents.
The project is positioned within immediate walking distance of the Arden Plaza shopping
center, which offers a range of retail, food service, and convenience uses. The
development does not propose to displace commercial uses but rather to add residential
density that supports the continued viability of the surrounding business ecosystem. On-
site amenities, including a business center with work-from-home rooms, supplement the
professional services available to residents.
g. To minimize the effects of traffic congestion, noise, odor, glare, and similar
safety problems.
The site plan has been designed to internalize parking and vehicular circulation,
minimizing conflict between vehicles and pedestrians. A complete photometric plan will
be submitted in compliance with the recommendations of the Ramsey County Sheriff's
Department, and the project will comply with all applicable lighting standards. Exterior
mechanical equipment will be screened in accordance with Section 1325.50. The
applicant will also submit a Security Plan subject for review and approval by the Ramsey
County Sheriff's Department. The developer will implement recommended mitigation
measures identified in the Traffic Study assessing the development's impact on
surrounding roadways.
B. Multi-Family Conditional Use Permit Criteria
The development will comply with the multi-family conditional use permit criteria as
follows:
Minimum Unit Size: The City’s minimum size requirement for one-bedroom units is 700
square feet. The proposed development includes 32 one-bedroom units, representing
approximately 19 percent of the total unit count, that are below this minimum. The
proposed one-bedroom unit is 663 square feet.
Roers Companies has found that folks looking for a 1-bedroom unit are often price
conscious, living alone, and are looking for the most efficient housing option available
that still provides a plethora of amenities in the community areas. Given this, we have
found that the smaller 1-bedroom units have been very popular within our portfolio. The
larger 1 bed units require higher rents and renters often do not see the value in an
additional 100 SF for a unit that accomplishes the same thing. Here are a few examples
of recent Roers Companies projects that had smaller 1-bedroom units that performed
very well.
Northlake Lofts (Lakeville, MN) - 686 SF 1-bedroom units - 1 unit available in the entire
property
Terra Residences (Maple Grove, MN) - 515-666 SF 1-bedroom units - property is 3.6%
vacant
Savor Apartments (West St. Paul, MN) - 660-677 SD 1-bedroom units - property is 5%
vacant
We recently ordered a market study for a project in Ramsey, MN. The comparable
properties included Aster, Aurora Vista, The Bowline, Delta, Golden Aspen Flats, Lyra
at Riverdale Station, Parkview Grand, Parkview East, The Residence at the COR,
Sapphire and The Village. All these properties have 1-bedroom units that are less than
700 SF. Based on the market data provided, the applicant requests a variance from the
700-square-foot minimum unit size requirement for these one-bedroom units.
Security Plan: A complete security plan will be submitted with the application package,
subject to approval by the Ramsey County Sheriff's Department.
Lighting Plan: A complete photometric plan will be submitted in compliance with Ramsey
County Sheriff's Department recommendations and the City's maximum lighting
requirements.
Parking: The proposed development provides a total of 300 parking stalls on site, equal
to approximately 1.78 stalls per dwelling unit. Of these, 148 stalls are enclosed,
providing approximately 0.89 enclosed stalls per dwelling unit. Although the overall
parking supply is adequate and exceeds one stall per unit, the number of enclosed
stalls does not meet the required 1:1 enclosed parking ratio. Accordingly, the applicant
requests a variance from the enclosed parking ratio requirement. The enclosed parking
structure will be attached to at least one principal structure.
Common Area: The development provides both indoor and outdoor common areas
devoted to recreation and leisure, as described in detail under Item 8 of the original
narrative. Indoor amenities include a community room, fitness center, sauna, frost locker,
locker room, lounge, work from home space, a 2nd floor sky lounge, and golf simulator.
Outdoor amenities include a pool, patio, yard game area, pickleball courts, playground,
and dog run.
Efficiency Apartments: There are not any efficiencies/studios in this project.
Bicycle Parking: Enclosed bicycle parking will be provided at a rate of 0.91 spaces per
dwelling unit.
Window Coverings: All windows visible from the exterior will be provided with consistent
window treatments throughout the development.
III. Zoning Code Amendment
A. Proposed Code Amendment
Roers Companies requests a Zoning Code Amendment to modify the density standard
applicable to the subject property. Under the existing B-2 General Business District
regulations, the maximum permitted density for multi-family development is 20 dwelling
units per acre, which would limit the subject 6± acre site to approximately 120 units.
Additionally, Roers Companies requests a modification to the floor area ratio (FAR). The
code establishes a maximum FAR of 0.8, while the proposed development would have
an FAR of 0.96. We’d like to propose a FAR increase to 1.0 This increase is directly
related to the requested increase in dwelling units per acre and is necessary to
accommodate the project’s overall density and design.
The proposed amendments would increase the allowable density within the Planned Unit
Development to up to 25 dwelling units per acre, allowing up to approximately 150 units
on the subject site. With the addition of having 10% of the units affordable to 80% AMI,
this would allow us a density bonus of 25% more units than permitted, allowing us to
achieve up to 30 dwelling units per acre, which would give us with the ability to provide
up to 180 units on the subject site. With the increased dwelling units per acre, the direct
relation to an increased FAR is to be expected. These amendments are requested in
conjunction with the Master Planned Unit Development application and is necessary to
make the project financially feasible while supporting the broader goals of the
development and the City’s adopted Comprehensive Plan.
B. Reasons the Modification Is Necessary
At the current maximum of 20 units per acre, the project cannot achieve the financial
performance required to support construction costs, land acquisition, and long-term
operation of a high-quality market-rate community with the level of amenities proposed.
Increasing the density to up to 30 units per acre as well as increasing the FAR to 1.0 is
the minimum adjustment necessary to make the development viable without
compromising design quality or amenity programming.
The subject site is one of the most appropriate locations in Arden Hills for higher-density
residential use. It is located on a major arterial corridor (Lexington Avenue North),
adjacent to I-694, and immediately proximate to established commercial services at
Arden Plaza. These attributes make it well-suited to support higher residential density
without placing undue burden on surrounding neighborhoods or infrastructure.
C. Public Interest and Consistency with the Comprehensive Development
Plan
The proposed density increase and FAR is in the public interest because it enables a
development that directly addresses the city's identified housing needs. As noted in the
Comprehensive Plan, Arden Hills has a significantly smaller proportion of multi-family
housing than peer communities, and the city has identified workforce and younger
households as underserved segments. A development of sufficient scale to generate
meaningful housing supply and support amenity investment requires a density level
above the current base standard.
The modification is consistent with the City's Comprehensive Development Plan, which
identifies housing diversification as a priority and acknowledges the importance of
attracting younger households. The plan also supports active living infrastructure, and the
development will contribute new sidewalk and pathway connections that advance this
goal. Increased density at a well-located corridor site is consistent with regional growth
management objectives and the plan's vision for Lexington Avenue as a vibrant mixed-
use corridor.
D. Criteria Under Section 1355.04 Subd. 3(B)
The applicant respectfully submits that the proposed Zoning Code Amendment satisfies
the criteria of Section 1355.04 Subd. 3(B). The amendment is narrowly tailored: it does
not propose a blanket change to the B-2 density standard but rather authorizes an
increased density within the context of a Planned Unit Development, where the City
retains full discretionary control over design, layout, and conditions of approval. The PUD
process ensures that any density increase is accompanied by corresponding public
benefits, including high-quality design, affordable housing compliance, and infrastructure
investment. The amendment is also consistent with the general purpose and intent of the
Zoning Ordinance, which recognizes PUD as a mechanism for achieving development
outcomes that exceed the baseline standards while advancing community goals.
IV. Planned Unit Development
1. Size of the Development Tract
The subject property at 3499 Lexington Avenue North, Arden Hills, Minnesota,
encompasses approximately 6± acres. The developable acreage is included in the survey
and legal description submitted as part of the application package and is approximately
5.66 acres.
2. Nature of the Applicant's Interest
Roers Companies is the developer and prospective owner of the proposed project. The
applicant has a contractual interest in the property and intends to develop, own, and
operate the multi-family residential community upon receipt of all required land use
approvals.
3. Density of Land Use
The proposed development will consist of 167 market-rate multi-family rental units on the
5.66-acre site, yielding a density of approximately 28 dwelling units per acre. As noted in
the Zoning Code Amendment narrative, the existing B-2 standard allows up to 20 units
per acre (approximately 120 units on this site). The applicant requests a modification to
the minimum lot area requirement of 2,178 square feet of lot per dwelling unit as part of
the PUD, increasing density to 30 units per acre as well as the FAR. This modification is
addressed in detail in the Zoning Code Amendment narrative and is necessary to achieve
project feasibility while delivering the amenities and design quality proposed.
4. Function, Ownership, and Maintenance of Common Open Space
All common open space, including interior amenity areas, outdoor gathering spaces, the
pool and patio area, pickleball courts, playground, dog run, pedestrian pathways, and
landscaped areas, will be owned and maintained by the property owner, Roers
Companies or its successor in interest. Common areas will be maintained to a high
standard as part of the ongoing management of the residential community. No common
open space is proposed for public dedication, though the sidewalk improvements along
Lexington Avenue North and Harriet Avenue will be constructed to public standards and
may be offered for public dedication or maintained as public infrastructure as agreed with
the City.
5. Feasibility of Sanitary Waste and Storm Water Disposal
The subject site is served by existing municipal sanitary sewer and water infrastructure.
The applicant will coordinate with the City and applicable utility authorities to confirm
capacity and identify any required upgrades. Storm water management will be designed
in accordance with applicable City and watershed district requirements. Drainage
calculations, including sizing of pipes, structures, and water storage areas, gradients, and
invert elevations, will be provided as part of the complete Drainage Plan submitted with
the Site Plan Review application materials.
6. Development Period and Staging Schedule
Roers Companies intends to develop the project as a single-phase development. Subject
to land use approval by the City, the applicant anticipates commencing construction in
2027, with a projected construction period of approximately 18 months. A more detailed
staging and phasing schedule will be provided as the project timeline is confirmed
following approval.
7. Requested Modifications to Zoning and Subdivision Regulations
The following modifications to otherwise applicable zoning and subdivision regulations
are requested as part of the Planned Unit Development:
• Density: Increase in maximum density from 20 dwelling units per acre to 30
dwelling units per acre in addition to the FAR, as described in the Zoning Code
Amendment narrative.
• Minimum Lot Area per Unit: Corresponding modification to the minimum lot area
requirement of 2,178 square feet per dwelling unit to permit 30 units per acre.
No additional modifications to zoning or subdivision regulations are anticipated at this
time. The applicant reserves the right to identify additional modifications as detailed
design progresses and will address any such modifications in subsequent submissions.
8. Public Interest and Consistency with the Comprehensive Development
Plan
The modifications requested under the Planned Unit Development are in the public
interest and consistent with the City's Comprehensive Development Plan and the general
purpose and intent of the Zoning Code for the following reasons:
• Housing Need: The Comprehensive Plan identifies a significant undersupply of
multi-family housing in Arden Hills. Increasing density at this well-located site
enables a development of sufficient scale to make a meaningful contribution to
housing supply and support the range of amenities that distinguish a high-quality
residential community from a marginal one.
• Demographic Goals: The plan identifies attracting younger households and
workforce residents as a priority. The proposed development, offering market-
rate rentals with contemporary amenities near employment and transportation, is
exactly the product type that appeals to this demographic.
• Public Benefits: The PUD produces demonstrable public benefits commensurate
with the density increase, including new sidewalk and pathway infrastructure,
affordable housing compliance under Section 1320.16, high-quality architectural
design, and enhanced connectivity between the residential community and Arden
Plaza.
• Appropriate Location: The subject site's location on a major arterial adjacent to I-
694 and established commercial uses makes it one of the most suitable locations
in the city for higher-density residential development. The requested density is
consistent with the intensity of land use that this locational context can support.
• Zoning Code Intent: The PUD mechanism is specifically designed to allow
flexible application of zoning standards where the resulting development
achieves outcomes superior to what strict application of the base standards
would produce. This project exemplifies that purpose: a well-designed, amenity-
rich, mixed-income residential community that advances the city's housing,
connectivity, and community vitality goals.
Submitted by Roers Companies | 3499 Lexington Avenue North, Arden Hills, MN | PC 26-009
50' - 0"
10
'
-
0
"
20' - 0"
20
'
-
0
"
COMMONS
167 UNITS @ 4 STORIES
1 LEVEL OF GARAGE BELOW
GARAGE ENTRYPOOLTOT LOT PATIO
ENTRY TRASH PAD
GARAGE ENTRY
TRASH PAD
RETENTION
6.1
1
6.1
2
6.1
3
6.2
1
6.2
5
COURTS
DOG RUN
RETENTION
RETENTION
6.2
4 6.2
3
6.
2 2
6.1
1
PLANNING METRICS
Zoning
Current: B-2 -General Business District
Proposed: PUD
Height
Allowed: __ Stories / 50 Feet
Proposed:4 Stories / 49'-1 1/2"
Density
Allowed: 20 Units per Acre (0.8 F.A.R.)
Proposed:30 Units per Acre (0.96 F.A.R.)
Lot Coverage
Allowed: __ % Impervious Coverage
Proposed:__ % Impervious Coverage
Setbacks
Allowed: 50 Front / 20 Rear / 10-20 Side
Proposed:50 Front / 50 Rear / 35-75 Side
Vehicle Parking
Required: 273 (1.1/1BR & 2/2BR+)
Proposed:300 (1.79)
N
kaas wilson architects
5/
2
9
/
2
0
2
6
1
2
:
4
8
:
3
0
P
M
Roers-Arden Hills-3499 Lexington Ave N AptsSITE PLAN
2.0 ADDRESS 26052 05.15.2026
1" = 80'-0"1 Level 1 - Site Plan
PARKING
Level Type Description Count
Level -1 GARAGE 9' x 18' ADA Accessible 2
Level -1 GARAGE 9' x 18' Standard 146
148 148
Level 1 SURFACE 9' x 18' ADA Accessible 6
Level 1 SURFACE 9' x 18' Standard 146
152 152
300GROSS AREA - TOTAL
Level Area
Level 4 47,895 SF
Level 3 47,895 SF
Level 2 47,896 SF
Level 1 53,984 SF
Level -1 52,273 SF
Grand total 249,944 SF
UNIT MIX - GROSS AREA
Name Count
Unit Gross
Area
%Main Floor
1BR
Unit 1-0 32 663 SF 19%
Unit 1-1 33 729 SF 20%
Unit 1-3 4 945 SF 2%
69 41%
2BR
Unit 2-0 10 994 SF 6%
Unit 2-1 55 1,062 SF 33%
Unit 2-2 6 1,245 SF 4%
Unit 2-3 7 1,336 SF 4%
Unit 2-4 8 1,064 SF 5%
86 51%
3BR
Unit 3-0 4 1,311 SF 2%
Unit 3-1 8 1,511 SF 5%
12 7%
Grand total 167 100%
kaas wilson architects
5/
2
9
/
2
0
2
6
1
2
:
2
5
:
3
2
P
M
Roers-Arden Hills-3499 Lexington Ave N AptsRENDERINGS
5.0 ADDRESS 26052 05.15.2026
kaas wilson architects
5/
2
9
/
2
0
2
6
1
2
:
2
5
:
3
2
P
M
Roers-Arden Hills-3499 Lexington Ave N AptsRENDERINGS
5.1 ADDRESS 26052 05.15.2026
kaas wilson architects
5/
2
9
/
2
0
2
6
1
2
:
2
5
:
3
2
P
M
Roers-Arden Hills-3499 Lexington Ave N AptsRENDERINGS
5.2 ADDRESS 26052 05.15.2026
N
kaas wilson architects
5/
2
9
/
2
0
2
6
1
2
:
2
5
:
3
3
P
M
Roers-Arden Hills-3499 Lexington Ave N AptsEXTERIOR MATERIALS
6.0 ADDRESS 26052 05.15.2026
Siding - Fiber Cement Panel - James Hardie - Arctic White Metal Panel - Elevate - Bone White Lap Siding - James Hardie - Rich EspressoSiding - Fiber Cement Panel - James Hardie - Iron Gray
Brick-SiouxCity-Glacier Gray Western Stone-CS_Profile-Cast-Fit-PARCHMENT-8x16
Level 1
100' -0"
Level -1
88' -8"
Level 2
111' -1 7/8"
Level 3
122' -3 3/4"
Level 4
133' -5 5/8"
Truss Brg.
144' -7 1/2"
49
'
-
1
1
/
2
"
Level 1
100' -0"
Level -1
88' -8"
Level 2
111' -1 7/8"
Level 3
122' -3 3/4"
Level 4
133' -5 5/8"
Truss Brg.
144' -7 1/2"IRON GRAY CFB PANEL
WHITE CFB PANEL
JAMES HARDIE LAP SIDING
FIRESTONE VERTICAL
METAL PANEL
BRICK VENEER
CASTFIT STONE
RTU RTU
Level 1
100' -0"
Level -1
88' -8"
Level 2
111' -1 7/8"
Level 3
122' -3 3/4"
Level 4
133' -5 5/8"
Truss Brg.
144' -7 1/2"
RTU
/
1
6.
1
/26.1
/
3
6.
1
/46.1
Level 1
100' -0"
Level 2
111' -1 7/8"
MATERIAL AREA % ON FACADE
WINDOWS -
MAGICPAK -
WOODTONE LAP SIDING -
WHITE CFB PANEL -
GRAY CFB PANEL -
BRICK -
CASTFIT STONE -
METAL PANEL -
22,997 SQFT
966 SQFT
15,557 SQFT
2,998 SQFT
12,398 SQFT
6,112 SQFT
12,227 SQFT
1,238 SQFT
74,493 SQFT
30.87%
1.30%
20.88%
4.02%
16.64%
8.20%
16.41%
1.66%
kaas wilson architects
5/
2
9
/
2
0
2
6
1
2
:
2
5
:
4
0
P
M
Roers-Arden Hills-3499 Lexington Ave N AptsEXTERIOR ELEVATIONS
6.1 ADDRESS 26052 05.15.2026
1" = 30'-0"1 West Elevation
1" = 30'-0"2 North Elevation
1" = 30'-0"3 East Elevation - 1
1" = 30'-0"4 North Elevation - 2
Level 1
100' -0"
Level -1
88' -8"
Level 2
111' -1 7/8"
Level 3
122' -3 3/4"
Level 4
133' -5 5/8"
Truss Brg.
144' -7 1/2"
RTU
Level 1
100' -0"
Level -1
88' -8"
Level 2
111' -1 7/8"
Level 3
122' -3 3/4"
Level 4
133' -5 5/8"
Truss Brg.
144' -7 1/2"
_____________________
6.2
6
49
'
-
1
1
/
2
"
Level 1
100' -0"
Level -1
88' -8"
Level 2
111' -1 7/8"
Level 3
122' -3 3/4"
Level 4
133' -5 5/8"
Truss Brg.
144' -7 1/2"
Level 1
100' -0"
Level -1
88' -8"
Level 2
111' -1 7/8"
Level 3
122' -3 3/4"
Level 4
133' -5 5/8"
Truss Brg.
144' -7 1/2"
IRON GRAY CFB PANEL
FIRESTONE VERTICAL
METAL PANEL
JAMES HARDIE LAP SIDING
BRICK VENEER
CASTFIT STONE
RTU
Level 1
100' -0"
Level -1
88' -8"
Level 2
111' -1 7/8"
Level 3
122' -3 3/4"
Level 4
133' -5 5/8"
Truss Brg.
144' -7 1/2"
RTU
/
2
6.
2
/16.2
/
4
6.
2
/36.2
/56.2
MATERIAL AREA % ON FACADE
WINDOWS -
MAGICPAK -
WOODTONE LAP SIDING -
WHITE CFB PANEL -
GRAY CFB PANEL -
BRICK -
CASTFIT STONE -
METAL PANEL -
22,997 SQFT
966 SQFT
15,557 SQFT
2,998 SQFT
12,398 SQFT
6,112 SQFT
12,227 SQFT
1,238 SQFT
74,493 SQFT
30.87%
1.30%
20.88%
4.02%
16.64%
8.20%
16.41%
1.66%
SIGNAGE HEIGHT AND WIDTH WILL VARY
BASED ON FINAL PROJECT NAME
1'-
5
"
kaas wilson architects
5/
2
9
/
2
0
2
6
1
2
:
2
5
:
5
9
P
M
Roers-Arden Hills-3499 Lexington Ave N AptsEXTERIOR ELEVATIONS
6.2 ADDRESS 26052 05.15.2026
1" = 30'-0"1 South Elevation -1
1" = 30'-0"2 West Elevation - 2
1" = 30'-0"3 South Elevation - 2
1" = 30'-0"4 East Elevation - 2
1" = 30'-0"5 South Elevation - 3
3/32" = 1'-0"6 Enlarged Plan -Placeholder Signage
N
kaas wilson architects
5/
2
9
/
2
0
2
6
1
2
:
2
6
:
1
5
P
M
Roers-Arden Hills-3499 Lexington Ave N AptsSHADOW STUDY - Summer & Winter Solstice
7.0 ADDRESS 26052 05.15.2026
Dec. 21st -9am Dec. 21st -12pm Dec. 21st -3pm
Jun. 21st -9am Jun. 21st -12pm Jun. 21st -3pm
N
kaas wilson architects
5/
2
9
/
2
0
2
6
1
2
:
2
6
:
3
2
P
M
Roers-Arden Hills-3499 Lexington Ave N AptsSHADOW STUDY - Spring & Fall Equinox
7.1 ADDRESS 26052 05.15.2026
Sept. 21st -9am Sept. 21st -12pm Sept. 21st -3pm
Mar. 21st -9am Mar. 21st -12pm Mar. 21st -3pm
36 18 18
29
18 18
7 7
1313
2
N
SCALE IN FEET
0 20 40
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
1
-
1
E
X
I
S
T
I
N
G
C
O
N
D
I
T
I
O
N
S
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
7
:
0
A
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
1. THE INFORMATION SHOWN ON THIS EXISTING CONDITIONS PLAN WAS PREPARED FROM AN A
ALTA/NSPS LAND TITLE SURVEY PREPARED BY LOUCKS. UTILITY INFORMATION SHOWN ON THIS
PLAN, SUCH AS SANITARY SEWER, WATERMAIN, STORM SEWER, FORCEMAIN, ETC. IS PER RECORD
PLANS PROVIDED BY THE CITY.
EXISTING CONDITIONS GENERAL NOTES
EXISTING
CONDITIONS
C1-1
GENERAL NOTES
SEE SHEET C1-3 FOR LOUCKS STANDARD NOTES.
PARKING STALL COUNT
DISABLED PARKING STALL
MAPLE
ASH
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
EXISTING BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
ELECTRIC METER
GAS METER
CONIFEROUS TREE
PINE
DECIDUOUS TREE
GUY WIRE
1 SCHEDULE B II ITEM
ELECTRIC TRANSFORMER
HAND HOLE
ROOF DRAIN
FOUND 1/2 INCH OPEN IRON
MONUMENT UNLESS SHOWN
OTHERWISE
SET 1/2 INCH X 14 INCH IRON
MONUMENT, MARKED "LS 54100"
MAPPED WATERMAIN
PAVERS
RIP-RAP
MAPPED UNDERGROUND ELECTRIC
MAPPED UNDERGROUND FIBER OPTIC
MAPPED UNDERGROUND TELEPHONE
BENCH
WILLOW
SPRUCE
LINDEN
BOXELDER
MULBERRY
BIRCH
ELM
MISC FRUIT
ARBORVITAE
OAK
WATER LINE
FLAG POLE
AIR CONDITIONING UNIT
LOCUST
CEDAR
SETBACK LINE
FOUND STONE
FOUND RAMSEY COUNTY
CAST IRON MONUMENT
YARD LIGHT
36 18 18
29
18 18
7 7
1313
2
REMOVE BUILDING W/ ASSOCIATED
PAVEMENTS, UTILITIES & STRUCTURES
REMOVE FENCE-TYP.
REMOVE SIGN-TYP.
REMOVE TREE-TYP.
REMOVE WALL-TYP.
REMOVE BITUMINOUS
PAVEMENT-TYP.
REMOVE BITUMINOUS
PAVEMENT-TYP.
REMOVE CONCRETE PAVEMENT-TYP.
REMOVE CONCRETE PAVEMENT-TYP.
REMOVE GRAVEL-TYP.
REMOVE CURB & GUTTER-TYP.
REMOVE CURB & GUTTER-TYP.
REMOVE ELECTRIC LINE-TYP.
(COORDINATE W/ ELECTRICAL & UTILITY COMPANY)
REMOVE LIGHT POLE & ASSOCIATED INFRASTRUCTURE-TYP.
(COORDINATE W/ ELECTRICAL & UTILITY COMPANY)
REMOVE LIGHT POLE & ASSOCIATED INFRASTRUCTURE-TYP.
(COORDINATE W/ ELECTRICAL & UTILITY COMPANY)
REMOVE SANITARY SEWER-TYP.
REMOVE FIBER OPTIC LINE-TYP.
(COORDINATE W/ UTILITY COMPANY)
"DRAINAGE & UTILITY EASEMENT" TO BE
VACATED BY SEPARATE INSTRUMENT
REMOVE TREE-TYP.
REMOVE TREE-TYP.
REMOVE SIGN-TYP.
REMOVE CONCRETE PAVEMENT-TYP.
REMOVE CONCRETE PAVEMENT-TYP.
REMOVE TREE-TYP.
REMOVE FLAG POLE
REMOVE CURB & GUTTER-TYP.
REMOVE BITUMINOUS
PAVEMENT-TYP.
TREE PROTECTION FENCE-TYP.
SAWCUT, REMOVE & REPLACE BITUMINOUS PAVEMENT AS NEEDED
FOR UTILITY CONSTRUCTION
(SEE UTILITY PLAN)
REMOVE BITUMINOUS
PAVEMENT-TYP.
REMOVE & SALVAGE SIGN
(COORDINATE W/ CITY)
REMOVE STORM SEWER STRUCTURE-TYP.
REMOVE STORM SEWER-TYP.
REMOVE STORM SEWER STRUCTURE-TYP.
REMOVE WALL-TYP.
REMOVE GRAVEL-TYP.
REMOVE GRAVEL-TYP.
REMOVE UNDERGROUND TELEPHONE-TYP.
(COORDINATE W/ UTILITY COMPANY)
REMOVE STORM SEWER-TYP.
REMOVE STORM SEWER STRUCTURE-TYP.
REMOVE STORM SEWER-TYP.
REMOVE BENCH
N
SCALE IN FEET
0 20 40
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
1
-
2
S
I
T
E
D
E
M
O
P
L
A
N
Pl
o
t
t
e
d
:
0
5
/
2
6
/
2
0
2
6
3
:
2
3
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
REMOVE EXISTING CURB & GUTTER, RETAINING WALLS,
FENCE, ETC.
REMOVE EXISTING MANHOLES, POWER POLES, LIGHT
POLES, BOLLARDS, PARKING METERS, SIGNS, ETC.
REMOVE EXISTING CONCRETE PAVING, SIDEWALKS,
ETC.
REMOVE EXISTING TREES
REMOVE EXISTING UTILITIES
REMOVE EXISTING BITUMINOUS PAVING
REMOVE EXISTING BUILDING
REMOVE EXISTING GRAVEL
TREE PROTECTION FENCE
DEMOLITION LEGEND
DEMOLITION
PLAN
C1-2
GENERAL NOTES
SEE SHEET C1-3 FOR LOUCKS STANDARD NOTES.
PARKING STALL COUNT
DISABLED PARKING STALL
MAPLE
ASH
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
EXISTING BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
ELECTRIC METER
GAS METER
CONIFEROUS TREE
PINE
DECIDUOUS TREE
GUY WIRE
1 SCHEDULE B II ITEM
ELECTRIC TRANSFORMER
HAND HOLE
ROOF DRAIN
FOUND 1/2 INCH OPEN IRON
MONUMENT UNLESS SHOWN
OTHERWISE
SET 1/2 INCH X 14 INCH IRON
MONUMENT, MARKED "LS 54100"
MAPPED WATERMAIN
PAVERS
RIP-RAP
MAPPED UNDERGROUND ELECTRIC
MAPPED UNDERGROUND FIBER OPTIC
MAPPED UNDERGROUND TELEPHONE
BENCH
WILLOW
SPRUCE
LINDEN
BOXELDER
MULBERRY
BIRCH
ELM
MISC FRUIT
ARBORVITAE
OAK
WATER LINE
FLAG POLE
AIR CONDITIONING UNIT
LOCUST
CEDAR
SETBACK LINE
FOUND STONE
FOUND RAMSEY COUNTY
CAST IRON MONUMENT
YARD LIGHT
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
1
-
3
G
E
N
E
R
A
L
N
O
T
E
S
Pl
o
t
t
e
d
:
0
5
/
2
6
/
2
0
2
6
3
:
2
3
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
GENERAL
NOTES
C1-3
1.CONTRACTOR SHALL REMOVE AND/OR RELOCATE EXISTING PRIVATE UTILITIES AS NECESSARY.
CONTRACTOR TO COORDINATE ACTIVITIES WITH UTILITY COMPANIES & OWNER.
2. CLEAR AND GRUB AND REMOVE ALL TREES NOTED FOR REMOVAL, VEGETATION AND SITE DEBRIS
WITHIN CONSTRUCTION LIMITS PRIOR TO GRADING. STRIP TOP SOIL AND STOCKPILE ON-SITE. ALL
REMOVED MATERIAL SHALL BE HAULED FROM THE SITE DAILY. ALL CLEARING AND GRUBBING
AND REMOVALS SHALL BE PERFORMED PER THE CONTRACT SPECIFICATIONS. EROSION CONTROL
MEASURES SHALL BE IMMEDIATELY ESTABLISHED UPON REMOVAL. SEE THE STORMWATER
POLLUTION PREVENTION PLAN (SWPPP) / GRADING & EROSION CONTROL PLAN.
3. CONTRACTOR SHALL PROTECT SURFACE AND SUBSURFACE FEATURES NOT NOTED FOR REMOVAL.
CONTRACTOR TO NOTIFY ENGINEER WITH ANY CONFLICTS OR PLAN DISCREPANCIES.
4. CONTRACTOR TO SCHEDULE PRE-CONSTRUCTION MEETING(S) WITH UTILITY OWNER(S) TO
DISCUSS DISCONNECTIONS AND/OR RELOCATIONS.
5. REFER TO TREE INVENTORY, TREE PRESERVATION, AND TREE REPLACEMENT PLAN FOR REMOVAL
AND REPLACEMENT OF ON SITE TREES.
6. CONTRACTOR TO VERIFY LOCATION OF SEPTIC FIELD(S) & WELL(S) ON SITE. COORDINATE
REMOVALS AND/OR ABANDONMENT WITH THE APPLICABLE GOVERNING AGENCIES.
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING APPLICABLE PERMITS. WELLS ON THE
PROPERTY SHALL BE SEALED BY A MINNESOTA DEPARTMENT OF HEALTH (MDH) LICENSED
CONTRACTOR.
7. BITUMINOUS PAVEMENT REMOVALS ARE TO BE MADE TO A VERTICAL SAW CUT OR TO A NEAT
MILLED EDGE.
8. CONCRETE PAVEMENT, SIDEWALK, CURB & GUTTER AND OTHER POURED CONCRETE ITEMS ARE TO
BE REMOVED TO AN EXISTING EXPANSION OR CONTRACTION JOINT. SAW CUT AS NECESSARY FOR
A NEAT EDGE OF REMOVAL.
9. ANY DAMAGE TO ITEMS NOT NOTED TO BE REMOVED SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR AND SHALL BE REPAIRED OR REPLACED TO ORIGINAL CONDITION WITH NO
ADDITIONAL COMPENSATION.
10. CONTRACTOR SHALL COORDINATE ALL WORK WITHIN THE PUBLIC RIGHT OF WAY WITH THE
APPLICABLE GOVERNING AGENCIES. ALL WORK SHALL BE PERFORMED PER THE REQUIREMENTS OF
THE APPLICABLE GOVERNING AGENCIES.
11. CONTRACTOR TO COORDINATE ALL WORK WITHIN THE ADJACENT PROPERTIES WITH THE OWNER
AND ADJACENT PROPERTY OWNER.
12. CONTRACTOR TO COORDINATE DEMOLITION PHASING WITH ALL DISCIPLINES INCLUDING BUT
NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL, & OWNER.
13. REFER TO THE GEOTECHNICAL REPORT PREPARED BY XXX, DATED XX, XXXX FOR INFORMATION
INCLUDING BUT NOT LIMITED TO GROUNDWATER CONDITIONS AND RECOMMENDATIONS FOR
EXCAVATION DEWATERING.
14. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER FOR ANY REPAIRS TO THE IRRIGATION
SYSTEM THAT IS AFFECTED DURING CONSTRUCTION.
SITE DEMOLITION NOTES
1. MINNESOTA STATE STATUTE REQUIRES NOTIFICATION PER "GOPHER STATE ONE CALL" PRIOR TO
COMMENCING ANY GRADING, EXCAVATION OR UNDERGROUND WORK.
2. THE CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AND
TOPOGRAPHIC FEATURES PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITY. THE
CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES OR VARIATIONS FROM THE
PLANS.
3. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO AVOID PROPERTY DAMAGE TO
ADJACENT PROPERTIES DURING THE CONSTRUCTION PHASE OF THIS PROJECT. THE CONTRACTOR
WILL BE HELD RESPONSIBLE FOR ANY DAMAGES TO ADJACENT PROPERTIES OCCURRING DURING
THE CONSTRUCTION PHASE OF THIS PROJECT.
4. THE CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING AND MAINTAINING TRAFFIC CONTROL
DEVICES TO CONTROL THE MOVEMENT OF TRAFFIC WHERE NECESSARY. ALL TRAFFIC CONTROL
SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL BE ESTABLISHED PER THE REQUIREMENTS
OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE APPLICABLE
GOVERNING AGENCIES. PLACEMENT OF THESE DEVICES SHALL BE APPROVED BY THE ENGINEER
PRIOR TO PLACEMENT. ALL PUBLIC STREETS SHALL BE OPEN TO TRAFFIC AT ALL TIMES UNLESS
APPROVED BY THE GOVERNING AGENCY.
5. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR
WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS ON THE JOB SITE, INCLUDING
SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS
REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS.
6. THE DUTY OF THE ENGINEER OR THE DEVELOPER TO CONDUCT CONSTRUCTION REVIEW OF THE
CONTRACTORS PERFORMANCE IS NOT INTENDED TO INCLUDE REVIEW OF THE ADEQUACY OF THE
CONTRACTORS SAFETY MEASURES IN, OR NEAR THE CONSTRUCTION SITE.
7. BEFORE BEGINNING CONSTRUCTION THE CONTRACTOR SHALL INSTALL EROSION AND
SEDIMENTATION CONTROL MEASURES IN ACCORDANCE WITH NPDES PERMIT REQUIREMENTS,
BEST MANAGEMENT PRACTICES, STATE AND LOCAL REQUIREMENTS AND THE ASSOCIATED
PROJECT PLANS AND DETAILS.
8. ALL CONSTRUCTION PERMITS, APPLICATIONS, BONDS, AND FEES ARE THE RESPONSIBILITY OF THE
CONTRACTOR.
9. ALL ENTRANCES, CONNECTIONS TO CITY STREETS, SIDEWALKS, CURBS AND RAMPS IN THE
RIGHT-OF-WAY SHALL BE CONSTRUCTED PER THE REQUIREMENTS OF THE STATE AND LOCAL
JURISDICTIONS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PERMITS AND NOTIFICATIONS
AS REQUIRED.
10. ADJUST ALL EXISTING STRUCTURES, BOTH PUBLIC AND PRIVATE TO THE PROPOSED GRADES
WHERE DISTURBED AND COMPLY WITH ALL REQUIREMENTS OF THE UTILITY OWNERS.
STRUCTURES BEING RESET TO PAVED AREAS MUST MEET OWNERS REQUIREMENTS FOR TRAFFIC
LOADING.
11. THE ENGINEER SHALL NOT HAVE ANY CONTROL OR CHARGE OF AND SHALL NOT BE RESPONSIBLE
FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR THE
SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK SHOWN ON THESE
PLANS. THE ENGINEER SHALL NOT BE RESPONSIBLE FOR THE CONTRACTORS SCHEDULES OR
FAILURES TO CARRY OUT THE WORK. THE ENGINEER IS NOT RESPONSIBLE FOR ACTS OR
OMISSIONS OF THE CONTRACTOR, SUBCONTRACTOR, OR THEIR AGENTS OR EMPLOYEES OR OF
ANY OTHER PERSON PERFORMING PORTIONS OF WORK.
GENERAL NOTES
1. ALL PAVING, CONCRETE CURB, GUTTER AND SIDEWALK SHALL BE FURNISHED AND INSTALLED IN
ACCORDANCE WITH THE DETAILS SHOWN PER THE DETAIL SHEET(S) AND APPLICABLE GOVERNING
AGENCY REQUIREMENTS.
2. ACCESSIBLE PARKING AND ACCESSIBLE ROUTES SHALL BE PROVIDED PER CURRENT ADA
STANDARDS AND APPLICABLE GOVERNING AGENCY REQUIREMENTS.
3. ALL CURB DIMENSIONS SHOWN ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED.
4. ALL BUILDING DIMENSIONS ARE TO THE OUTSIDE FACE OF WALL UNLESS OTHERWISE NOTED.
5. BITUMINOUS IMPREGNATED FIBER BOARD TO BE PLACED AT FULL DEPTH OF CONCRETE ADJACENT
TO EXISTING STRUCTURES AND BEHIND CURB ADJACENT TO DRIVEWAYS AND SIDEWALKS.
6. SEE SITE ELECTRICAL PLAN FOR SITE LIGHTING.
7. REFER TO THE GEOTECHNICAL REPORT PREPARED BY XXX, DATED XX, XXXX FOR AN EXISTING
SUBSURFACE SITE CONDITION ANALYSIS AND CONSTRUCTION RECOMMENDATIONS INCLUDING
BUT NOT LIMITED TO PAVEMENTS AND EXTERIOR SLABS.
SITE NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SITE SIGNAGE AND STRIPING AS SHOWN ON THIS
PLAN.
2. CONTRACTOR SHALL PAINT ALL ACCESSIBLE STALLS, LOGOS AND CROSS HATCH LOADING AISLES
WITH WHITE OR YELLOW PAVEMENT MARKING PAINT, 4" IN WIDTH.
3. CONTRACTOR SHALL PAINT ANY/ALL DIRECTIONAL TRAFFIC ARROWS, AS SHOWN, IN WHITE OR
YELLOW PAINT.
4. ALL SIGNAGE SHALL INCLUDE POST, CONCRETE FOOTING AND STEEL CASING WHERE REQUIRED.
5. ALL SIGNAGE NOT PROTECTED BY CURB, LOCATED IN PARKING LOT OR OTHER PAVED AREAS TO
BE PLACED IN STEEL CASING, FILLED WITH CONCRETE AND PAINTED YELLOW. REFER TO DETAIL(S).
6. ANY/ALL STOP SIGNS TO INCLUDE A 24" WIDE PAINTED STOP BAR IN WHITE PAINT, PLACED AT THE
STOP SIGN LOCATION, A MINIMUM OF 4' FROM CROSSWALK IF APPLICABLE. ALL STOP BARS SHALL
EXTEND FROM DIRECTIONAL TRANSITION BETWEEN LANES TO CURB.
7. ALL SIGNS TO BE PLACED 18" BEHIND BACK OF CURB UNLESS OTHERWISE NOTED.
SIGNAGE AND STRIPING NOTES
1. SPOT ELEVATIONS REPRESENT FINISHED SURFACE GRADES, GUTTER/FLOW LINE, FACE OF BUILDING,
OR EDGE OF PAVEMENT UNLESS OTHERWISE NOTED.
2. ALL ACCESSIBLE ROUTES SHALL BE CONSTRUCTED WITH A CROSS SLOPE NOT EXCEEDING 2% AND
A RUNNING SLOPE NOT EXCEEDING 5%.
3. AT TURNING POINTS ALONG THE ACCESSIBLE ROUTE THE PAVEMENT SHALL NOT EXCEED 2% IN
ANY DIRECTION FOR AN AREA 60" IN DIAMETER.
4. ALL PUBLIC SIDEWALKS SHALL BE CONSTRUCTED WITH A CROSS SLOPE NOT EXCEEDING 2% AND A
RUNNING SLOPE NOT EXCEEDING 5%.
5. CATCH BASINS AND MANHOLES IN PAVED AREAS SHALL BE SUMPED 0.04 FEET. ALL CATCH BASINS
IN GUTTERS SHALL BE SUMPED 0.16 FEET. RIM ELEVATIONS SHOWN ON PLANS DO NOT REFLECT
SUMPED ELEVATIONS.
6. REFER TO GEOTECHNICAL EVALUATION REPORT (REPORT XXX), DATED XX XX, XXXX AS PREPARED
BY XXX, FOR AN EXISTING SUBSURFACE SITE CONDITION ANALYSIS AND CONSTRUCTION
RECOMMENDATIONS INCLUDING BUT NOT LIMITED TO:
A. REUSE OF ON-SITE SOILS
B. GROUNDWATER AND RECOMMENDATIONS FOR EXCAVATION DEWATERING.
C. SITE GRADING AND SUBGRADE PREPARATION.
D. PAVEMENTS AND EXTERIOR SLABS.
E. TRENCH EXCAVATION AND BACKFILL.
F. EXTERIOR UTILITY SUPPORTS.
G. FROST PROTECTION.
7. EXISTING SOILS ARE ASSUMED TO BE FINE-GRAINED SOILS (ML, CL) PER THE UNIFIED SOIL
CLASSIFICATION. CONTRACTOR TO NOTIFY ENGINEER IF EXISTING CONDITIONS DIFFER FROM
ASSUMED SOIL CONDITIONS.
8. GRADING, INCLUDING BUT NOT LIMITED TO EXCAVATION AND BACKFILL, OF THE FILTRATION
AREA(S) SHALL BE ACCOMPLISHED USING LOW-IMPACT EARTH-MOVING EQUIPMENT TO PREVENT
COMPACTION OF THE UNDERLYING SOILS. SMALL TRACKED DOZERS AND BOBCATS WITH
RUNNER TRACKS ARE RECOMMENDED. NO WHEELED MACHINES SHALL BE USED.
9. A FLOOD TEST OR DOUBLE RING INFILTROMETER TEST SHALL BE COMPLETED FOR THE FILTRATION
SYSTEM TO VERIFY INFILTRATION RATES ARE WITHIN THE ACCEPTABLE RANGE OF +0.8 IN/HR.
10. CITY AND WATERSHED SHALL BE NOTIFIED AT LEAST 24 HOURS PRIOR TO CONSTRUCTION OF
STORMWATER BMPS.
11. ALL DISTURBED UNPAVED AREAS ARE TO RECEIVE MINIMUM OF 4 INCHES OF TOP SOIL AND
SEED/MULCH OR SOD. THESE AREAS SHALL BE WATERED/MAINTAINED BY THE CONTRACTOR UNTIL
VEGETATION IS ESTABLISHED. REFER TO THE LANDSCAPE PLANS, DETAILS AND SPECIFICATIONS FOR
FINAL SITE STABILIZATION.
12. FOR SITE RETAINING WALLS "TW" EQUALS SURFACE GRADE AT TOP FACE OF WALL (NOT TOP OF
WALL), "GW" EQUALS SURFACE GRADE AT WALL GRADE TRANSITION, AND "BW" EQUALS SURFACE
GRADE AT BOTTOM FACE OF WALL (NOT BOTTOM OF BURIED WALL COURSES).
13. FOR SITE STAIRS, "TS" EQUALS SURFACE ELEVATION AT TOP OF STAIRS AND "BS" EQUALS SURFACE
ELEVATION AT BOTTOM OF STAIRS. REFER TO SITE PLAN FOR NUMBER OF RISERS AND RISER
HEIGHT.
14. STREETS MUST BE CLEANED AND SWEPT WHENEVER TRACKING OF SEDIMENTS OCCURS AND
BEFORE SITES ARE LEFT IDLE FOR WEEKENDS AND HOLIDAYS. A REGULAR SWEEPING SCHEDULE
MUST BE ESTABLISHED.
15. DUST MUST BE ADEQUATELY CONTROLLED.
16. SEE SWPPP FOR ADDITIONAL EROSION CONTROL NOTES AND REQUIREMENTS.
17. SEE UTILITY PLAN FOR WATERMAIN, STORM SEWER, AND SANITARY SEWER INFORMATION.
18. SEE SITE PLAN FOR CURB AND BITUMINOUS TAPER LOCATIONS.
19. REFERENCE ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR BUILDING ELEVATIONS.
20. THE CONTRACTOR ALONG WITH THE OWNER SHALL OBTAIN ALL NECESSARY PERMITS AND
APPROVALS FROM GOVERNING AUTHORITIES, INCLUDING ANY CITY PERMITS AND THE NPDES
PERMIT.
21. INSTALL EROSION CONTROL AND TREE PROTECTION MEASURES BEFORE BEGINNING SITE GRADING
ACTIVITIES. SOME EROSION CONTROLS SUCH AS BALE CHECKS AND TEMPORARY SILT PONDS MAY
BE INSTALLED AS GRADING OCCURS IN SPECIFIC AREAS. MAINTAIN EROSION CONTROLS
THROUGHOUT THE GRADING PROCESS AND REMOVE WHEN TURF HAS BEEN ESTABLISHED.
22. PER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM/STATE DISPOSAL SYSTEM
(NPDES/SDS) REQUIREMENTS, THE WASHOUT AND CLEANOUT OF STUCCO, PAINT, CONCRETE,
FORM RELEASE OILS, CURING COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS SHALL BE
PROPERLY CONTAINED AND DISPOSED OF. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
PROVIDING AND USING APPROVED METHODS OF CONTAINMENT SUCH AS PRE-FABRICATED
WASHOUT CONTAINERS, CONCRETE WASHOUT TOTE, READY MIX TRUCKS WITH SELF-CONTAINED
CHUTE CLEANOUT, ETC.
23. CONTRACTOR SHALL PROVIDE AS-BUILT INFORMATION OF GRADING ACTIVITIES AS NEEDED PER
APPLICABLE PERMIT REQUIREMENTS AND/OR DEVELOPMENT AGREEMENTS.
GRADING, DRAINAGE & EROSION CONTROL NOTES
1. ALL STORM SEWER, SANITARY SEWER AND WATERMAIN UTILITIES SHALL BE FURNISHED AND
INSTALLED PER THE REQUIREMENTS OF THE SPECIFICATIONS,THE MINNESOTA PLUMBING CODE,
THE LOCAL GOVERNING UNIT, AND THE STANDARD UTILITIES SPECIFICATION OF THE CITY
ENGINEERS ASSOCIATION OF MINNESOTA (CEAM), CURRENT EDITION.
2. ALL UTILITY PIPE BEDDING SHALL BE COMPACTED SAND OR FINE GRANULAR MATERIAL. ALL
COMPACTION SHALL BE PERFORMED PER THE REQUIREMENTS OF THE CEAM SPECIFICATION AND
THE GEOTECHNICAL REPORT.
3. ALL CONNECTIONS TO EXISTING UTILITIES SHALL BE PERFORMED PER THE REQUIREMENTS OF THE
STATE AND LOCAL JURISDICTIONS. THE CITY DEPARTMENT OF ENGINEERING AND BUILDING
INSPECTIONS DEPARTMENT AND THE CONSTRUCTION ENGINEER MUST BE NOTIFIED AT LEAST 48
HOURS PRIOR TO ANY WORK WITHIN THE PUBLIC RIGHT OF WAY, OR WORK IMPACTING PUBLIC
UTILITIES.
4. CONTRACTOR TO ENSURE THAT MECHANICAL JOINTS COMPLY WITH ASTM C1173 OR ASTM C1461
AND THE MECHANICAL JOINT TYPE IS INTENDED FOR THE SPECIFIC TRANSITION PER MINNESOTA
PLUMBING CODE (SECTION 705.10 JOINTS BETWEEN VARIOUS MATERIALS).
5. ALL SITE UTILITY SERVICES SHALL TERMINATE 5' FROM THE EXTERIOR BUILDING WALL UNLESS
OTHERWISE NOTED. THE SITE UTILITY CONTRACTOR SHALL COORDINATE WITH THE GENERAL
CONTRACTOR, MECHANICAL CONTRACTOR AND MECHANICAL ENGINEER TO DETERMINE THE
RESPONSIBILITY OF BRINGING THE SERVICE(S) INTO THE BUILDING, INSPECTIONS AND TESTING PER
APPLICABLE GOVERNING AGENCIES.
6. ALL NEW WATERMAIN AND SERVICES MUST HAVE A MINIMUM OF 8.0 FEET OF COVER. EXTRA
DEPTH MAY BE REQUIRED TO MAINTAIN A MINIMUM 18" VERTICAL SEPARATION TO SANITARY OR
STORM SEWER LINES. THE CONTRACTOR SHALL FIELD ADJUST WATERMAIN TO AVOID CONFLICTS
WITH SANITARY SEWER, STORM SEWER, AND SERVICES AS REQUIRED. INSULATION OF WATERMAIN
AND SANITARY SEWER LINES SHALL BE PROVIDED WHERE 8.0 FEET MINIMUM DEPTH CAN NOT BE
ATTAINED.
7. PER MINNESOTA DEPARTMENT OF LABOR & INDUSTRY REQUIREMENTS, A MINIMUM OF 18 INCHES
OF VERTICAL SEPARATION AND 10 FEET OF HORIZONTAL SEPARATION IS REQUIRED FROM
WATERMAIN TO ANY MANHOLE, SEPTIC SYSTEM, CATCH BASIN, SEWER PIPE, OR OTHER SOURCE OF
CONTAMINATION, MEASURED FROM THE OUTER EDGE OF THE PIPE TO THE OUTER EDGE OF THE
CONTAMINATION SOURCE UNLESS OTHERWISE SHOWN.
8. ALL STORM SEWER DOWNSPOUT COLLECTION PIPES AND WYES SHALL BE PVC (SCHEDULE 40).
9. CONTRACTOR TO SUBMIT SHOP DRAWINGS OF SANITARY & STORM STRUCTURE(S) AND
UNDERGROUND SYSTEM(S) FOR ENGINEER'S REVIEW.
10. CONTRACTOR TO VERIFY UNDERLYING SOILS BENEATH ALL STORMWATER FACILITIES, AND
PROVIDE DOCUMENTATION TO THE ENGINEER, PRIOR TO CONSTRUCTION OF THE FACILITIES.
11. ALL PORTIONS OF THE SANITARY & STORM SEWER SYSTEMS, INCLUDING CATCH BASINS, LOCATED
WITHIN 10 FEET OF THE BUILDING OR WATER SERVICE LINE MUST BE TESTED ACCORDANCE WITH
MINNESOTA RULES, PART 4714.
12. ALL FIRE HYDRANTS SHALL BE LOCATED 5 FEET BEHIND BACK OF CURB OR EDGE OF PAVEMENT
UNLESS OTHERWISE NOTED.
13. HYDRANT USE: CONTRACTOR IS RESPONSIBLE TO NOTIFY THE CITY OF ARDEN HILLS WHEN THEY
NEED TO USE A HYDRANT; ONLY PRE-AUTHORIZED HYDRANTS WILL BE USED. HYDRANTS TO BE
OPERATED ONLY WITH PROPER EQUIPMENT SUCH AS A HYDRANT NUT WRENCH, NOT A PIPE
WRENCH, HYDRANT METER IS AVAILABLE FROM THE CITY OF ARDEN HILLS. ANY TRUCK, ETC.
FILLED FROM A HYDRANT MUST BE METERED, MUST HAVE PHYSICAL BREAK OR BACK-FLOW
PREVENTER APPROVED BY THE CITY OF ARDEN HILLS. ALSO APPLIES TO SUBCONTRACTORS.
14. OPERATING VALVES FOR TURNING WATER MAIN ON/OFF: THE CITY OF ARDEN HILLS WILL OPERATE
ALL VALVES AND FILL ALL WATER MAINS (PUBLIC AND PRIVATE). CONTRACTOR SHALL GIVE AT
LEAST 24 HOURS NOTICE TO HAVE WATER SHUT OFF AND SHALL NOTIFY IN WRITING, ALL
AFFECTED CUSTOMERS AT LEAST 24 HOURS IN ADVANCE BEFORE SHUT OFF; ATTACH TO DOOR,
ETC., NOT IN MAILBOXES.
15. TEMPORARY SERVICE: THE CONTRACTOR SHALL PROVIDE TEMPORARY SERVICE IF SERVICE CANNOT
BE RESTORED SAME DAY. IF USING HYDRANT FOR TEMPORARY SERVICE, NOTIFY THE CITY OF
ARDEN HILLS AND USE ONLY PRE-APPROVED HYDRANT AND SUPPLIED HYDRO METER WITH BACK
FLOW. THE CONTRACTOR'S TEMPORARY MAIN SHALL BE DISINFECTED, FLUSHED AND
BACTERIOLOGICAL ANALYSIS SHOWN NEGATIVE PRIOR TO PUTTING THE TEMPORARY SYSTEM IN
SERVICE. THE TEMPORARY WATER SYSTEM SHALL BE IN PLACE PRIOR TO THE CITY OF ARDEN HILLS
SHUTTING OFF ANY WATER MAINS.
16. REFER TO GEOTECHNICAL EVALUATION REPORT (REPORT XX), DATED XX XX, XXXX AS PREPARED BY
XX, FOR AN EXISTING SUBSURFACE SITE CONDITION ANALYSIS AND CONSTRUCTION
RECOMMENDATIONS INCLUDING BUT NOT LIMITED TO:
A. REUSE OF ON-SITE SOILS
B. GROUNDWATER AND RECOMMENDATIONS FOR EXCAVATION DEWATERING.
C. SITE GRADING AND SUBGRADE PREPARATION.
D. PAVEMENTS AND EXTERIOR SLABS.
E. TRENCH EXCAVATION AND BACKFILL.
F. EXTERIOR UTILITY SUPPORTS.
G. FROST PROTECTION.
17. CONTRACTOR SHALL PROVIDE AS-BUILT INFORMATION OF CONSTRUCTED UTILITIES
(RECOMMENDED PRIOR TO BACKFILLING) PER APPLICABLE PERMIT REQUIREMENTS AND/OR
DEVELOPMENT AGREEMENTS.
18. ALL UNUSED UTILITY SERVICES SHALL BE ABANDONED PER THE REQUIREMENTS OF THE
APPLICABLE GOVERNING AGENCIES.
19. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL REQUIRED UTILITY PERMITS FROM THE
APPLICABLE GOVERNING AGENCIES.
UTILITY NOTES
PROPOSED
BUILDING
FFE=947.25
GFE=936.25
(COORDINATE W/
ARCHITECTURAL)
NO
PARKING
NO
PA
R
K
I
N
G
NO
PA
R
K
I
N
G
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 2P
NWL=DRY
HWL=932.73
20.0'
50.0'
10.0'
20.0'
26.0'
TYP.
18.0'
TYP.
9.0'
TYP.
5
9.0'
TYP.
18.0'
TYP.
26.0'
TYP.
7.0'
TYP.
50' BUILDING &
PARKING SETBACK
20' BUILDING & PARKING SETBACK
20' BUILDING & PARKING SETBACK
10' BUILDING & PARKING SETBACK
12 12
27
27
7
7
8
6
8 9
6
5
6
6
15'R
41'R
3'R 3'R
3'R
15'R
3'R
3'R
3'R
3'R
3'R
3'R
3'R
3'R
8'R
8'R
10'R
46'R
15'R 15'R
20'R
3'R3'R3'R3'R3'R3'R10'R
15'R15'R
20'R
36'R
10'R
46'R
10'R
10'R 8'R
8'R
3'R
3'R
3'R
3'R
3'R
3'R3'R3'R
15'R10'R10'R
10'R10'R
3'R
3'R3'R
5.0'
5.0'
5.0'
5.0'
7.0'
TYP.
7.0'
TYP.
17.7'
9.0'
TYP.
18.0'
TYP.
STOP (R1-1) SIGN-TYP.
(SEE DETAIL)
STOP (R1-1) SIGN-TYP.
(SEE DETAIL)
ADA PARKING SIGN/BOLLARD COMBO-TYP.
(SEE DETAIL)
ADA PARKING SIGN/BOLLARD COMBO-TYP.
(SEE DETAIL)
ADA PARKING SIGN/BOLLARD COMBO-TYP.
(SEE DETAIL)
ADA ACCESS AISLE STRIPING-TYP.
(SEE DETAIL)
ADA PARKING STALL STRIPING-TYP.
(SEE DETAIL)
ADA PARKING STALL STRIPING-TYP.
(SEE DETAIL)
PEDESTRIAN RAMP-TYP.
(SEE DETAIL)
B612 CURB & GUTTER-TYP.
(SEE DETAIL)
B612 CURB & GUTTER-TYP.
(SEE DETAIL)
B612 CURB & GUTTER-TYP.
(SEE DETAIL)
B612 CURB & GUTTER-TYP.
(SEE DETAIL)
BITUMINOUS PAVEMENT-TYP.
(SEE DETAIL)
BITUMINOUS PAVEMENT-TYP.
(SEE DETAIL)
CONCRETE PAVEMENT-TYP.
(SEE DETAIL)
CONCRETE PAVEMENT-TYP.
(SEE DETAIL)
CONCRETE PAVEMENT-TYP.
(SEE DETAIL)
CONCRETE SIDEWALK-TYP.
(SEE DETAIL)
CONCRETE SIDEWALK-TYP.
(SEE DETAIL)
CONCRETE SIDEWALK-TYP.
(SEE DETAIL)
HEAVY-DUTY BITUMINOUS
PAVEMENT-TYP.
(SEE DETAIL)
HEAVY-DUTY BITUMINOUS
PAVEMENT-TYP.
(SEE DETAIL)
DRIVEWAY APRON
(SEE DETAIL)
DRIVEWAY APRON
(SEE DETAIL)MATCH EXISTING BITUMINOUS PAVEMENT
MATCH EXISTING BITUMINOUS PAVEMENT
MATCH EXISTING CURB & GUTTER MATCH EXISTING CURB & GUTTER MATCH EXISTING CURB & GUTTER
MATCH EXISTING CURB & GUTTER
5' B612 TO B618 CURB TRANSITION
5' B612 TO B618 CURB TRANSITION
CONCRETE STAIRS & RAILINGS
(SEE GRADING PLAN, ARCHITECTURE
& STRUCTURAL)
CONCRETE STAIRS & RAILINGS
(SEE GRADING PLAN, ARCHITECTURE
& STRUCTURAL)
CONCRETE STOOP
(SEE ARCHITECTURE & STRUCTURAL)
CONCRETE STOOP
(SEE ARCHITECTURE & STRUCTURAL)
CONCRETE STOOP
(SEE ARCHITECTURE & STRUCTURAL)
CONCRETE STOOP
(SEE ARCHITECTURE & STRUCTURAL)
FENCE
(SEE LANDSCAPE)
FENCE
(SEE LANDSCAPE)
CONCRETE STOOP
(SEE ARCHITECTURE & STRUCTURAL)
RETAINING WALL-TYP.
(SEE DETAIL)
AMENITY AREA
(SEE LANDSCAPE)
TOT LOT
(SEE LANDSCAPE)
ADA ACCESS AISLE STRIPING-TYP.
(SEE DETAIL)
ADA PARKING STALL STRIPING-TYP.
(SEE DETAIL)
SPORTS COURTS
(BY OTHERS)
DOG RUN
(SEE LANDSCAPE)
PATIO
(SEE LANDSCAPE)
PATIO-TYP.
(SEE DETAIL)
BALCONY-TYP.
(SEE ARCHITECTURAL)
PATIO-TYP.
(SEE DETAIL)
BALCONY-TYP.
(SEE ARCHITECTURAL)
TRASH STAGING AREA
(SEE DETAIL)
TRASH STAGING AREA
(SEE DETAIL)
5.0'
5.0'
5.0'
5.0'
70.0'
40.0'
26.0'
TYP.
26.0'
TYP.
5.0'
7.0'
TYP.
REPLACE SALVAGED SIGN
(COORD. W/ CITY & COUNTY)
CONCRETE SIDEWALK-TYP.
(SEE DETAIL)
RETAINING WALL-TYP.
(SEE DETAIL)
SIDEWALK CONNECTION
(COORD. W/ ADJACENT PROPERTY
OWNER & COUNTY)
SIDEWALK CONNECTION
(COORD. W/ ADJACENT PROPERTY OWNER)
HEAVY-DUTY CONCRETE
PAVEMENT-TYP.
(SEE DETAIL)
HEAVY-DUTY CONCRETE
PAVEMENT-TYP.
(SEE DETAIL)
5.0'
7.0'
TYP.
RETAINING WALL-TYP.
(SEE DETAIL)
B618 CURB & GUTTER-TYP.
(SEE DETAIL)CITY STREET BITUMINOUS PAVEMENT-TYP.
(SEE DETAIL)
CITY STREET BITUMINOUS PAVEMENT-TYP.
(SEE DETAIL)
CITY STREET BITUMINOUS PAVEMENT-TYP.
(SEE DETAIL)
RETAINING WALL-TYP.
(SEE DETAIL)
PEDESTRIAN GATE-TYP.
(SEE DETAIL)
CONCRETE STAIRS & RAILINGS
(SEE GRADING PLAN, ARCHITECTURE
& STRUCTURAL)
82.5'
ROW
60.0'
ROW
LIGHT POLE-TYP.
(SEE ELECTRICAL)
LIGHT POLE-TYP.
(SEE ELECTRICAL)
SNOW STORAGE AREA-TYP.
SNOW STORAGE AREA-TYP.
(1) BIKE RACK
(SEE LANDSCAPE)
MONUMENT SIGN
(SEE ARCHITECTURAL)
26.9'
29.2'
25.3'
194.4'
136.7'
116.1'115.6'
PROPOSED EASEMENT
PROPOSED EASEMENT
PROPOSED EASEMENT
2.0'8.0'
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
2
-
1
S
I
T
E
P
L
A
N
Pl
o
t
t
e
d
:
0
5
/
2
8
/
2
0
2
6
1
0
:
4
0
A
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
N
SCALE IN FEET
0 20 40
SITE PLAN
C2-1
CURRENT ZONING: B2 (GENERAL BUSINESS DISTRICT)
PROPOSED ZONING: PUD
PROPERTY AREA (GROSS): 6.00 ± AC
RIGHT OF WAY AREA: 0.34 ± AC
PONDING AREA: 0.24 ± AC
BUILDABLE PROPERTY AREA (NET): 5.66 ± AC
GROSS SITE DENSITY: 28.0 UNITS/AC.
NET SITE DENSITY: 29.7 UNITS/AC.
FLOOR AREA RATIO (FAR):0.96
BUILDING HEIGHT:49 FT 11
2 IN
DISTURBED AREA: 5.32 ± AC
EXISTING IMPERVIOUS AREA: 2.21 ± AC (39.0%)*
PROPOSED IMPERVIOUS AREA: 3.28 ± AC (58.0%)*
*IMPERVIOUS AREAS BASED ON NET PROPERTY AREA ONLY
SITE DATA
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
DIRECTION OF FLOW 1.0%
972.5
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
YARD (BUILDING) SETBACKS:
FRONT (LEXINGTON)50 FT MINIMUM
SIDE 10 FT MINIMUM
SIDE-CORNER (HARRIET)20 FT MINIMUM
REAR 20 FT MINIMUM
OFF-STREET PARKING SETBACKS:
FRONT (LEXINGTON)50 FT MINIMUM
SIDE 10 FT MINIMUM
SIDE-CORNER (HARRIET)20 FT MINIMUM
REAR 20 FT MINIMUM
MINIMUM PARKING LAYOUT DIMENSIONS (90 DEGREE PATTERN):
PARKING SPACE WIDTH = 9 FT
PARKING SPACE LENGTH = 18 FT
DRIVE LANE WIDTH = 26 FT*
*ASSUMED TO FOLLOW IFC REQUIRED DIMENSIONS
PARKING LOT ISLAND/PENINSULA REQUIREMENTS:
PLANTING ISLANDS SHALL OCCUPY AT LEAST 10 PERCENT OF THE
PARKING AREA.
MINIMUM ISLAND/PENINSULA AREA SHALL BE 150 SQ FT.
PROPOSED SURFACE ACCESSIBLE PARKING: 6 STALLS
PROPOSED GARAGE ACCESSIBLE PARKING: 2 STALLS
TOTAL 8 STALLS
REQUIRED ACCESSIBLE PARKING: 8 STALLS**
**REQUIRED MINIMUM NUMBER OF ACCESSIBLE SPACES FOR 301 TO 400 STALLS
DEVELOPMENT AND DESIGN STANDARDS
OFF-STREET PARKING CALCULATIONS
PROPOSED APARTMENT UNITS = 168 UNITS
TOTAL ONE-BEDROOM UNITS:= 64 UNITS @ 1.1 STALLS PER UNIT = 71 STALLS
TOTAL TWO-BEDROOM UNITS: = 92 UNITS @ 2 STALLS PER UNIT = 184 STALLS
TOTAL THREE-BEDROOM UNITS: = 12 UNITS @ 2 STALLS PER UNIT = 24 STALLS
TOTAL PARKING REQUIRED = 279 STALLS
PROPOSED SURFACE PARKING = 151 STALLS
PROPOSED GARAGE PARKING = 149 STALLS
TOTAL PARKING PROVIDED = 300 STALLS
ACCESSIBLE PARKINGGENERAL NOTES
SEE SHEET C1-3 FOR LOUCKS STANDARD NOTES.
PAVEMENT LEGEND
BITUMINOUS PAVEMENT
CONCRETE PAVEMENT
HEAVY DUTY BITUMINOUS PAVEMENT
CONCRETE SIDEWALK
CITY STREET BITUMINOUS PAVEMENT
HEAVY DUTY CONCRETE PAVEMENT
SNOW STORAGE AREA
B612 CURB & GUTTER (STANDARD)
B612 CURB & GUTTER (TIP OUT)
FLAT CURB & GUTTER (STANDARD)
FLAT CURB & GUTTER (TIP OUT)
NOTE:
SEE CURB & GUTTER DETAILS ON SHEET C8-2.
CURB TYPES
DESCRIPTION UNIT
BUILDINGS AC
PARKING LOT & DRIVEWAYS AC
WALKWAYS & PATIOS AC
POOLS AC
DECORATIVE PONDS AC
QUANTITY
(EXISTING)
0.27
1.87
0.07
0.00
0.00
PERVIOUS AC 3.45±
COVERAGE CALCULATIONS
QUANTITY
(PROPOSED)
1.18
1.39
0.69
0.02
0.00
2.38±
PROPOSED
BUILDING
FFE=947.25
GFE=936.25
(COORDINATE W/
ARCHITECTURAL)
NO
PARKING
NO
PA
R
K
I
N
G
NO
PA
R
K
I
N
G
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 2P
NWL=DRY
HWL=932.73
SEE ARCHITECTURAL
FOR CONTINUATION
SEE ARCHITECTURAL
FOR CONTINUATION
SEE ARCHITECTURAL
FOR CONTINUATION
VERIFY WIDTH, LATCH SIDE, & SWING
DIRECTION OF PEDESTRIAN GATES
PROVIDE ADEQUATE MANEUVERING
CLEARANCE ON BOTH SIDES OF GATE
VERIFY WIDTH, LATCH SIDE, & SWING
DIRECTION OF PEDESTRIAN GATES
PROVIDE ADEQUATE MANEUVERING
CLEARANCE ON BOTH SIDES OF GATE
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
2
-
2
A
C
C
E
S
S
I
B
L
E
R
O
U
T
E
P
L
A
N
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
9
:
2
6
A
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
N
SCALE IN FEET
0 20 40
ACCESSIBLE
ROUTE PLAN
C2-2
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
DIRECTION OF FLOW 1.0%
972.5
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
GENERAL NOTES
SEE SHEET C1-3 FOR LOUCKS STANDARD NOTES.
ACCESSIBLE ROUTE
5' ACCESSIBLE MANEUVERING CLEARANCE
ACCESSIBLE ROUTE NOTES
1. ALL WALKS AND STALLS CONSTRUCTED AS PART OF AN ADA
ROUTE SHALL MEET CURRENT ADA STANDARDS, AS WELL AS
STATE/LOCAL REQUIREMENTS.
2. WALKS AND STALLS SHALL MEET ADA REQUIREMENTS FOR
CROSS AND RUNNING SLOPES UNLESS OTHERWISE NOTED.
3. CONTRACTOR TO NOTIFY ENGINEER IF ANY ADDITIONAL
AREAS, WHICH DO NOT MEET REQUIREMENTS, ARE
DISCOVERED DURING CONSTRUCTION.
4. SEE DETAIL SHEET(S) FOR GRADING AND ACCESSIBILITY
DETAILS.
5. ACCESSIBLE ROUTE REQUIREMENTS:
RUNNING SLOPE:5.0% MAX (4.5% DESIGN)
CROSS SLOPE:2.0% MAX (1.5% DESIGN)
RAMP RUNNING SLOPE 8.33% MAX (8.0% DESIGN)
STALL/ACCESS AISLE SLOPE: 2.0% MAX (1.5% DESIGN)
SIDEWALK WIDTH:36" MIN. (60" DESIGN)
ACCESSIBILITY LEGEND
PROPOSED
BUILDING
FFE=947.25
GFE=936.25
(COORDINATE W/
ARCHITECTURAL)
NO
PARKING
NO
PA
R
K
I
N
G
NO
PA
R
K
I
N
G
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 2P
NWL=DRY
HWL=932.73
Front-Loading Garbage Truck
Front-L
o
a
d
i
n
g
G
a
r
b
a
g
e
T
r
u
c
k
F
r
o
n
t
-
L
o
a
d
i
n
g
G
a
r
b
a
g
e
T
r
u
c
k
Front-Loadin
g
G
a
r
b
a
g
e
T
r
u
c
k
Front-Loading Garbage Truck Front-Loading Garbage Truck
Front-Loa
d
i
n
g
G
a
r
b
a
g
e
T
r
u
c
k
Fr
o
n
t
-
L
o
a
d
i
n
g
G
a
r
b
a
g
e
T
r
u
c
k
Front-L
o
a
d
i
n
g
G
a
r
b
a
g
e
T
r
u
c
k
Front-Loading Garbage Truck
Front-Loading Garbage Truck
PROPOSED
BUILDING
FFE=947.25
GFE=936.25
(COORDINATE W/
ARCHITECTURAL)
NO
PARKING
NO
PA
R
K
I
N
G
NO
PA
R
K
I
N
G
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 2P
NWL=DRY
HWL=932.73
E-ONE HP95 Mid Mount
E-
O
N
E
H
P
9
5
M
i
d
M
o
u
n
t
E-ONE
H
P
9
5
M
i
d
M
o
u
n
t
E-ON
E
H
P
9
5
M
i
d
M
o
u
n
t
E-
O
N
E
H
P
9
5
M
i
d
M
o
u
n
t
E-ON
E
H
P
9
5
M
i
d
M
o
u
n
t
E-O
N
E
H
P
9
5
M
i
d
M
o
u
n
t
E-ONE H
P
9
5
M
i
d
M
o
u
n
t
E-ONE
H
P
9
5
M
i
d
M
o
u
n
t
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
2
-
3
T
U
R
N
I
N
G
M
O
V
E
M
E
N
T
S
Pl
o
t
t
e
d
:
0
5
/
2
6
/
2
0
2
6
3
:
2
6
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
N
SCALE IN FEET
0 40 80
TURNING
MOVEMENTS
C2-3
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
DIRECTION OF FLOW 1.0%
972.5
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
GENERAL NOTES
SEE SHEET C1-3 FOR LOUCKS STANDARD NOTES.
33
10.5 17.5
Front-Loading Garbage Truck
Overall Length 33.000ft
Overall Width 8.500ft
Overall Body Height 12.359ft
Min Body Ground Clearance 1.048ft
Track Width 8.500ft
Lock-to-lock time 6.00s
Curb to Curb Turning Radius 29.200ft
GARBAGE TRUCK TURNING MOVEMENT FIRE TRUCK TURNING MOVEMENTS
47.75
7.917 18.417 4.833
20.833
E-ONE HP95 Mid Mount
Overall Length 47.750ft
Overall Width 8.333ft
Overall Body Height 11.000ft
Min Body Ground Clearance 1.393ft
Track Width 8.333ft
Lock-to-lock time 6.00s
Max Wheel Angle 45.00°
PROPOSED
BUILDING
FFE=947.25
GFE=936.25
(COORDINATE W/
ARCHITECTURAL)
NO
PARKING
NO
PA
R
K
I
N
G
NO
PA
R
K
I
N
G
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
9
4
5
9
4
3
9
4
4
9
4
6
940
937938939941942943
9
4
5
9
4
1
9
4
2
9
4
3
9
4
4
9
4
0
9
3
9
94
1
936
936
937
938
935
940
936937938939
941
935
932
933
934
936
937
938
936
937
938
93
6
93
6
937
938
947
94
6
946
9
4
6
946
93
5
9
3
3
93
3
93
493
6
93
7
935
940
934
936
937
938
939
930
931
932
933
9
3
0
9
3
5
9
3
1
9
3
2
9
3
3
9
3
4
9
3
6
9
3
7
93
0
93
5
92
9
93
1
93
2
93
3
93
4
936
937
941
93
6
94
2
9
4
3
9
4
4
9
4
0
9
3
9
94
1
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 2P
NWL=DRY
HWL=932.73
38.47± EX.
39.00± EX.
40.00± EX.
40.61± EX.
41.00± EX.
42.72± EX.
42.00± EX.
43.00± EX.
44.00± EX.
45.00± EX.
46.00± EX.
46.83± EX.
46.87± EX.
46.00± EX.
45.41± EX.
45.00± EX.
44.81± EX.
44.96± EX.45.00± EX.44.00± EX.43.00± EX.42.00± EX.41.23± EX.41.00± EX.
39.82± EX.
39.00± EX.38.00± EX.37.00± EX.36.00± EX.35.00± EX.
34.00± EX.
34.00± EX.
34.39± EX.
34.00± EX.
33.40± EX.
33.18± EX.
33.00± EX.
33.45± EX.
35.17± EX.
34.72± EX.
34.27± EX.
34.41± EX.
33.74± EX.
33.12± EX.
33.00± EX.
32.70± EX.
32.24± EX.32.01± EX.32.62± EX.
31.51± EX.31.59± EX.31.45± EX.31.25± EX.
32.00± EX.
33.07± EX.33.50± EX.34.00± EX.35.00± EX.34.19± EX.36.00± EX.36.36± EX.
35.47± EX.35.84± EX.36.02± EX.36.05± EX.
37.00± EX.
46.75 37.39
37.03
36.85
36.25
36.25
36.25
36.16
36.17
39.5146.36
47.24
47.24
47.25
47.24
47.25
46.75
47.1847.1847.2547.25
47.25
47.25
47.25
47.25
42.27
41.2936.2536.25
38.84
45.43
45.77
44.1444.80
41.56
39.27
43.97
38.72
44.67
2.
5
%
2.
1
%
2
.
1
%
39.78
39.83
35.75 35.7535.90
37.11
37.18 37.18
37.11
38.41
38.41
38.24 37.92
36.0936.27
39.78
38.32
40.55
39.58
40.27
40.63
2.0%
42.11
42.41
44.24
42.77
2.0%
44.60
2.0%
41.84
42.31
42.13
1.
0
%
43.48
43.30
1.
0
%
36.84
36.66
1.
0
%
36.28
34.67
34.78
35.14
2.
0
%
41.47
41.83
2.
0
%
40.73
41.09
2.
0
%
40.33
2.
0
%
40.69 38.56 34.01 33.61
33.09
33.39 EOF
34.58
35.48
35.88
37.96
33.65
38.06
37.70
39.92
39.56
39.22
42.64
44.45
43.48
45.35
42.47
2.0%
44.47 46.09 46.49
46.34
46.07
44.88
44.16
43.77
43.41 40.64
40.82
37.27
38.13
36.81
37.99
36.81
37.95
38.1341.38
41.02
31.8331.70
33.04
32.59 32.60
45.15
46.61
33.21
35.66
38.14
36.99
37.4046.34
36.06
38.1737.77
36.63
45.91
44.52
45.22
45.66
45.13
45.09
46.00
46.47
47.26
46.96
45.18 38.32
1.
0
%
2.
0
%
1.
0
%
2.
0
%
3.3%
3.3%3.3%
3.3%
2.5%3.4%
2.5%3.4%
1.6%3.4%
3.8%3.8%1.5%2.8%
4.2%1.8%4.0%
1.6%3.4%
3.
8
%
3.
8
%
2.
4
%
2.0%
3.3%
3.
1
%
3.
1
%
3.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
4.
2
%
4.
6
%
1.
5
%
1.
5
%
1.2%
7.
3
%
2.
1
%
1.
5
%
2.
1
%
7.
3
%
3
.
9
%
8
.
0
%
2.7%38.63
1
.
5
%
1
.
0
%
2.
9
%
2.
9
%
2.
9
%
2.
9
%
TW=47.16
TW=45.76
TW=43.37
BW=47.16
BW=43.88
BW=43.37
TW=44.26
BW=44.26
TW=45.76
BW=43.95
TW=47.16
BW=47.16
TS=47.16
BS=43.94
45.20
45.47
45.46 EOF
45.87 EOF
46.05 EOF 46.05 EOF
44.77 EOF
TW=40.88
BW=40.00
TW=37.63
BW=38.51
TW=37.63
BW=38.51
3.
2
%
3.0%
3.0%1.5%
1.5%
1.8%1.
0
%
1.
0
%
1.
0
%
1.5%
1.5%
1.7
%
1.
0
%
1.
0
%
3.
3
%
3.
3
%
2.1%
2.1%
4.
4
%
1.0
%
1.0%
1.0%
1.0%
1.0%
1.0%
1.0%37.22
1
.
8
%
3.
9
%
3.
9
%
2.
9
%
1.
5
%
1.
5
%
2.
9
%
3.
9
%
4.
0
%
1.
6
%
1.0%
1.8%
2.
1
%
2.6%
2.6%
1.7%
35.75
35.85
35.75
46.93
47.11
46.78
0.7%
1.5%
4.
7
%
4.7%
4.
6
%
36.09
TW=40.88
BW=40.00
46.87
46.1946.19
46.39
35.62
37.11
33.30
35.22± EX.
2.8%
2.0%2.0%
30.00 30.00
33.50 EOF
4.
4
%
3.
9
%
1.
5
%
1.
5
%
33.50 EOF
33.00 33.00
4
:
1
33.80
4:
1
30.00
TW=35.00
BW=35.00
TW=37.57
BW=35.00
TW=39.00
BW=35.00
TW=38.48
BW=35.00
TW=37.06
BW=37.00
TW=33.25
BW=33.25
TW=37.50
BW=33.00
TW=33.50
BW=33.00
4:1
31.00
30.00
4:1
31.00
23
.
4
%
23
.
9
%
37.37
29.00
32.00
4:1
29.00
32.00
4:
1
29.00
32.00
4:1
32.50 EOF 32.80
32.80
38.03 37.63
36.2036.60
34.85
34.77
2.1%
7.4
%
35.38
34.22
35.96
36.0940.40
40.35 40.30
40.3545.11
45.03 1.6%4.5%
35.50
1.0%
33.60
38.20
38.1539.51
37.96
37.91
33.16
36.58
36.25 EOF
3.
7
%
3.
8
%
3.
3
%
3.
1
%
33.66
32.00
2.
1
%
2
.
1
%
1.1%
2.1%
33.80 33.80
33.80
2
.
0
%
32.50 EOF
32.80 32.80 32.80
32.80
1
.
7
%
45.5945.64
45.21
2
.
1
%
33.35
33.27
33.42± EX.
33.00± EX.
34.00± EX.
34.00± EX.
34.00± EX.
36.11± EX.36.50± EX.
35.82± EX.
35.68± EX.
35.61± EX.
35.00± EX.
34.35
39.77± EX.
32.57
1.
8
%
6.5%
37.77
37.5437.88
37.46
2.
8
%
21
.
2
%
27.0
%
46.62
TW=34.71
BW=34.71
TW=35.44
BW=33.59
TW=35.98
BW=34.75
TW=36.32
BW=34.56
TW=36.62
BW=35.79
35.47
37.65
37.65
1.1%
34.01± EX.
RIP-RAP BASIN OVERFLOW
(SEE DETAIL)
RIP-RAP BASIN OVERFLOW
(SEE DETAIL)
N
SCALE IN FEET
0 20 40
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
3
-
1
G
R
A
D
I
N
G
P
L
A
N
Pl
o
t
t
e
d
:
0
5
/
2
6
/
2
0
2
6
3
:
2
7
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
DIRECTION OF FLOW 1.0%
972.5
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
GRADING
PLAN
C3-1
LOUCKS IS PLEASED TO OFFER
CONSTRUCTION STAKING SERVICES.
PLEASE CONTACT BRIAN PECHACEK
FOR INQUIRIES.
EMAIL: BPECHACEK@LOUCKSINC.COM
PHONE: 763.424.5505
CONSTRUCTION STAKING
GENERAL NOTES
SEE SHEET C1-3 FOR LOUCKS STANDARD NOTES.
PROPOSED
BUILDING
FFE=947.25
GFE=936.25
(COORDINATE W/
ARCHITECTURAL)
NO
PARKING
NO
PA
R
K
I
N
G
NO
PA
R
K
I
N
G
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
9
4
5
9
4
3
9
4
4
9
4
6
940
937938939941942943
9
4
5
9
4
1
9
4
2
9
4
3
9
4
4
9
4
0
9
3
9
94
1
936
936
937
938
935
940
936937938939
941
935
932
933
934
936
937
938
934
936
937
938
93
6
93
6
937
938
947
94
6
946
9
4
6
946
93
5
9
3
3
93
3
93
493
6
93
7
93
4
935
940
934
936
937
938
939
934
930
931
932
933
9
3
0
9
3
5
9
3
1
9
3
2
9
3
3
9
3
4
9
3
6
9
3
7
9
3
4
93
0
93
5
92
9
93
1
93
2
93
3
93
4
936
937
93
4
941
93
6
94
2
9
4
3
9
4
4
9
4
0
9
3
9
94
1
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 2P
NWL=DRY
HWL=932.73
38.47± EX.
39.00± EX.
40.00± EX.
40.61± EX.
41.00± EX.
42.72± EX.
42.00± EX.
43.00± EX.
44.00± EX.
45.00± EX.
46.00± EX.
46.83± EX.
46.87± EX.
46.00± EX.
45.41± EX.
45.00± EX.
44.81± EX.
44.96± EX.45.00± EX.44.00± EX.43.00± EX.42.00± EX.41.23± EX.41.00± EX.
39.82± EX.
39.00± EX.38.00± EX.37.00± EX.36.00± EX.35.00± EX.
34.00± EX.
34.00± EX.
34.39± EX.
34.00± EX.
33.40± EX.
33.18± EX.
33.00± EX.
33.45± EX.
35.17± EX.
34.72± EX.
34.27± EX.
34.41± EX.
33.74± EX.
33.12± EX.
33.00± EX.
32.70± EX.
32.24± EX.32.01± EX.32.62± EX.
31.51± EX.31.59± EX.31.45± EX.31.25± EX.
32.00± EX.
33.07± EX.33.50± EX.34.00± EX.35.00± EX.34.19± EX.36.00± EX.36.36± EX.
35.47± EX.35.84± EX.36.02± EX.36.05± EX.
37.00± EX.
46.75 37.39
37.03
36.85
36.25
36.25
36.25
36.16
36.17
39.5146.36
47.24
47.24
47.25
47.24
47.25
46.75
47.1847.1847.2547.25
47.25
47.25
47.25
47.25
42.27
41.2936.2536.25
38.84
45.43
45.77
44.1444.80
41.56
39.27
43.97
38.72
44.67
2.
5
%
2.
1
%
2
.
1
%
39.78
39.83
35.75 35.7535.90
37.11
37.18 37.18
37.11
38.41
38.41
38.24 37.92
36.0936.27
39.78
38.32
40.55
39.58
40.27
40.63
2.0%
42.11
42.41
44.24
42.77
2.0%
44.60
2.0%
41.84
42.31
42.13
1.
0
%
43.48
43.30
1.
0
%
36.84
36.66
1.
0
%
36.28
34.67
34.78
35.14
2.
0
%
41.47
41.83
2.
0
%
40.73
41.09
2.
0
%
40.33
2.
0
%
40.69 38.56 34.01 33.61
33.09
33.39 EOF
34.58
35.48
35.88
37.96
33.65
38.06
37.70
39.92
39.56
39.22
42.64
44.45
43.48
45.35
42.47
2.0%
44.47 46.09 46.49
46.34
46.07
44.88
44.16
43.77
43.41 40.64
40.82
37.27
38.13
36.81
37.99
36.81
37.95
38.1341.38
41.02
31.8331.70
33.04
32.59 32.60
45.15
46.61
33.21
35.66
38.14
36.99
37.4046.34
36.06
38.1737.77
36.63
45.91
44.52
45.22
45.66
45.13
45.09
46.00
46.47
47.26
46.96
45.18 38.32
1.
0
%
2.
0
%
1.
0
%
2.
0
%
3.3%
3.3%3.3%
3.3%
2.5%3.4%
2.5%3.4%
1.6%3.4%
3.8%3.8%1.5%2.8%
4.2%1.8%4.0%
1.6%3.4%
3.
8
%
3.
8
%
2.
4
%
2.0%
3.3%
3.
1
%
3.
1
%
3.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
2.
0
%
4.
2
%
4.
6
%
1.
5
%
1.
5
%
1.2%
7.
3
%
2.
1
%
1.
5
%
2.
1
%
7.
3
%
3
.
9
%
8
.
0
%
2.7%38.63
1
.
5
%
1
.
0
%
2.
9
%
2.
9
%
2.
9
%
2.
9
%
TW=47.16
TW=45.76
TW=43.37
BW=47.16
BW=43.88
BW=43.37
TW=44.26
BW=44.26
TW=45.76
BW=43.95
TW=47.16
BW=47.16
TS=47.16
BS=43.94
45.20
45.47
45.46 EOF
45.87 EOF
46.05 EOF 46.05 EOF
44.77 EOF
TW=40.88
BW=40.00
TW=37.63
BW=38.51
TW=37.63
BW=38.51
3.
2
%
3.0%
3.0%1.5%
1.5%
1.8%1.
0
%
1.
0
%
1.
0
%
1.5%
1.5%
1.7
%
1.
0
%
1.
0
%
3.
3
%
3.
3
%
2.1%
2.1%
4.
4
%
1.0
%
1.0%
1.0%
1.0%
1.0%
1.0%
1.0%37.22
1
.
8
%
3.
9
%
3.
9
%
2.
9
%
1.
5
%
1.
5
%
2.
9
%
3.
9
%
4.
0
%
1.
6
%
1.0%
1.8%
2.
1
%
2.6%
2.6%
1.7%
35.75
35.85
35.75
46.93
47.11
46.78
0.7%
1.5%
4.
7
%
4.7%
4.
6
%
36.09
TW=40.88
BW=40.00
46.87
46.1946.19
46.39
35.62
37.11
33.30
35.22± EX.
2.8%
2.0%2.0%
30.00 30.00
33.50 EOF
4.
4
%
3.
9
%
1.
5
%
1.
5
%
33.50 EOF
33.00 33.00
4
:
1
33.80
4:
1
30.00
TW=35.00
BW=35.00
TW=37.57
BW=35.00
TW=39.00
BW=35.00
TW=38.48
BW=35.00
TW=37.06
BW=37.00
TW=33.25
BW=33.25
TW=37.50
BW=33.00
TW=33.50
BW=33.00
4:1
31.00
30.00
4:1
31.00
23
.
4
%
23
.
9
%
37.37
29.00
32.00
4:1
29.00
32.00
4:
1
29.00
32.00
4:1
32.50 EOF 32.80
32.80
38.03 37.63
36.2036.60
34.85
34.77
2.1%
7.4
%
35.38
34.22
35.96
36.0940.40
40.35 40.30
40.3545.11
45.03 1.6%4.5%
35.50
1.0%
33.60
38.20
38.1539.51
37.96
37.91
33.16
36.58
36.25 EOF
3.
7
%
3.
8
%
3.
3
%
3.
1
%
33.66
32.00
2.
1
%
2
.
1
%
1
.
1
%
2.1%
33.80 33.80
33.80
2
.
0
%
32.50 EOF
32.80 32.80 32.80
32.80
1
.
7
%
45.5945.64
45.21
2
.
1
%
33.35
33.27
33.42± EX.
33.00± EX.
34.00± EX.
34.00± EX.
34.00± EX.
36.11± EX.36.50± EX.
35.82± EX.
35.68± EX.
35.61± EX.
35.00± EX.
34.35
39.77± EX.
32.57
1.
8
%
6.5%
37.77
37.5437.88
37.46
2.
8
%
21
.
2
%
27.
0
%
46.62
TW=34.71
BW=34.71
TW=35.44
BW=33.59
TW=35.98
BW=34.75
TW=36.32
BW=34.56
TW=36.62
BW=35.79
35.47
37.65
37.65
1.1%
34.01± EX.
ROCK CONSTRUCTION
ENTRANCE-TYP.
(SEE DETAIL)
SILT FENCE-TYP.
(SEE DETAIL)
TRENCH DRAIN INLET
PROTECTION-TYP.
(SEE DETAIL)
EROSION CONTROL BLANKET-TYP.
(SEE DETAIL)
EROSION CONTROL BLANKET-TYP.
(SEE DETAIL)
EROSION CONTROL BLANKET-TYP.
(SEE DETAIL)
TRENCH DRAIN INLET
PROTECTION-TYP.
(SEE DETAIL)
ROCK CONSTRUCTION
ENTRANCE-TYP.
(SEE DETAIL)
SILT FENCE-TYP.
(SEE DETAIL)
DOUBLE ROW OF
SILT FENCE
(SEE DETAIL)
INLET PROTECTION-TYP.
(SEE DETAIL)
INLET PROTECTION-TYP.
(SEE DETAIL)
N
SCALE IN FEET
0 20 40
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
3
-
2
S
W
P
P
P
P
L
A
N
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
7
:
5
1
A
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
DIRECTION OF FLOW 1.0%
972.5
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
GENERAL NOTES
SEE SHEET C1-3 FOR LOUCKS STANDARD NOTES
AND SHEET C3-3 FOR SWPPP NOTES.
INLET PROTECTION
SILT FENCE
EXISTING DRAINAGE PATTERN
PROPOSED DRAINAGE PATTERN
BIO ROLLS
EROSION CONTROL BLANKET
SWPPP LEGEND
DESCRIPTION UNIT
TEMPORARY ROCK CONSTRUCTION ENTRANCE EA
PREFABRICATED CONCRETE WASHOUT EA
SILT FENCE (STANDARD)LF
EROSION CONTROL BLANKET SY
INLET PROTECTION EA
QUANTITY
2
NOT ALLOWED
2,470
1,530
12
SEEDING AC 1.60±
ESTIMATED QUANTITIES
SWPPP
C3-2
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
3
-
2
S
W
P
P
P
P
L
A
N
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
7
:
5
3
A
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
SWPPP NOTES
C3-3
1. THE NATURE OF THIS PROJECT WILL CONSIST OF CONSTRUCTING A PROPOSED BUILDING ADDITION,
SURFACE PAVEMENTS, UTILITIES, AND UNDERGROUND STORMWATER MANAGEMENT SYSTEMS.
2. THE INTENDED SEQUENCING OF MAJOR CONSTRUCTION ACTIVITIES ARE AS FOLLOWS:
A. INSTALL VEHICLE TRACKING BMP (DATE)
B. INSTALL INLET PROTECTION (DATE)
C. INSTALL SILT FENCE AROUND SITE (DATE)
D. CLEAR AND GRUB SITE (DATE)
E. STRIP AND STOCKPILE TOPSOIL (DATE)
F. REMOVE PAVEMENTS AND UTILITIES (DATE)
G. ROUGH GRADE SITE (DATE)
H. IMPORT CLEAN FILL FOR REPLACEMENT AND BALANCE (DATE)
I. INSTALL UTILITIES (DATE)
J. INSTALL BUILDING FOUNDATIONS (DATE)
K. INSTALL CURB AND GUTTER (DATE)
L. INSTALL PAVEMENTS AND WALKS (DATE)
M. FINAL GRADE SITE (DATE)
N. REMOVE ACCUMULATED SEDIMENT FROM STORMWATER SYSTEMS (DATE)
O. SEED AND MULCH (DATE)
P. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS STABILIZED, REMOVE SILT
FENCE, INLET PROTECTION, AND RESEED ANY AREAS DISTURBED BY THE REMOVAL.
3. SITE DATA:
DISTURBED AREA: 5.32 AC
PRE-CONSTRUCTION IMPERVIOUS AREA: 2.21 AC
POST-CONSTRUCTION IMPERVIOUS AREA: 3.28 AC
GENERAL SOIL TYPE: SEE GEOTECHNICAL EVALUATION REPORT BY XXX
HYDROLOGY INFORMATION: SEE HYDROLOGY REPORT PREPARED BY LOUCKS
4. EROSION AND SEDIMENT CONTROLS WERE DESIGNED TO EFFECTIVELY CONTROL STORMWATER RUNOFF
WITHIN THE PROJECT AREAS. EROSION AND SEDIMENT CONTROL HAVE BEEN PROPOSED TO MINIMIZE
CHANNEL EROSION AND SCOUR IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS. FACTORS THAT
WERE CONSIDERED INCLUDE PROPOSED IMPERVIOUS AREAS, SLOPE OF IMPERVIOUS SURFACES,
STORMWATER INFRASTRUCTURE DISCHARGE POINTS, AND ANNUAL AVERAGE PRECIPITATION DATA FOR
THE PROJECT AREA.
5. RAMSEY COUNTY RECEIVES AN AVERAGE OF 31 INCHES OF PRECIPITATION PER YEAR. THE FOLLOWING
COUNTY 24-HOUR STORM EVENTS ARE BASED ON ATLAS 14 RAINFALL DATA:
2-YR 2.81 INCHES
10-YR 4.20 INCHES
100-YR 7.34 INCHES
6. SEE "EXHIBIT: PROPOSED DRAINAGE AREAS" FOR SITE MAP WITH DRAINAGE AREA BOUNDARIES.
7. THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE IDENTIFIED WITH FLAGS, STAKES, SIGNS, SILT
FENCE, ETC. BEFORE CONSTRUCTION BEGINS.
8. CONTRACTOR SHALL INSTALL RAIN GAUGE ON SITE.
9. GROUNDWATER & DEWATERING
A. REFER TO THE GEOTECHNICAL REPORT PREPARED BY XX DATED XX, XXXX FOR INFORMATION
INCLUDING BUT NOT LIMITED TO GROUNDWATER CONDITIONS AND RECOMMENDATIONS FOR
EXCAVATION DEWATERING.
B. FOLLOW LOCAL, STATE, AND FEDERAL REGULATIONS FOR GROUNDWATER PUMPING AND
OBTAIN ALL NECESSARY PERMITS. A WATER USE PERMIT FROM THE DNR IS REQUIRED WHEN
WITHDRAWING MORE THAN 10,000 GALLONS OF WATER PER DAY OR 1 MILLION GALLONS PER
YEAR.
C. DISPERSE DISCHARGE USING APPROPRIATE ENERGY DISSIPATION MEASURES.
D. BMPS SHALL BE USED TO PREVENT TURBID OR SEDIMENT LADEN WATERS FROM LEAVING SITE.
E. DEWATERING SHALL NOT CAUSE NUISANCE CONDITIONS INCLUDING BUT NOT LIMITED TO
EROSION OR SCOUR IN THE IMMEDIATE VICINITY OF DISCHARGE POINTS OR INUNDATION OF
WETLANDS THAT CAUSES SIGNIFICANT ADVERSE IMPACTS TO THE WETLAND.
10. REFER TO THE GEOTECHNICAL REPORT PREPARED BY XXX DATED XX, XXXX FOR INFORMATION AND
RECOMMENDATIONS RELATED TO SOIL CONTAMINATION.
11. ALL DISTURBED GROUND LEFT INACTIVE FOR SEVEN (7) OR MORE DAYS SHALL BE STABILIZED BY
SEEDING OR SODDING (ONLY AVAILABLE PRIOR TO SEPTEMBER 15) OR BY MULCHING OR COVERING OR
OTHER EQUIVALENT CONTROL MEASURE.
12. ON SLOPES 3:1 OR GREATER MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND/OR GULLIES, SLOPE
LENGTHS CAN NOT BE GREATER THAN 75 FEET.
13. ALL STORM DRAINS AND INLETS MUST BE PROTECTED UNTIL ALL SOURCES OF POTENTIAL DISCHARGE
ARE STABILIZED.
14. SOIL COMPACTION SHALL BE MINIMIZED DURING CONSTRUCTION.
15. TEMPORARY SOIL STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROL AND CAN NOT BE PLACED IN
SURFACE WATERS OR STORM WATER CONVEYANCE SYSTEMS. TEMPORARY STOCKPILES WITHOUT
SIGNIFICANT AMOUNT OF SILT, CLAY, OR ORGANIC COMPOUNDS ARE EXEMPT EX: CLEAN AGGREGATE
STOCK PILES, DEMOLITION CONCRETE STOCKPILES, SAND STOCKPILES.
16. SEDIMENT CONTROL PRACTICES SHALL BE INSTALLED ON ALL DOWNGRADIENT PERIMETERS AND
UPGRADIENT OF ANY BUFFER ZONES.
17. SEDIMENT LADEN WATER MUST BE DISCHARGED TO A SEDIMENTATION BASIN WHENEVER POSSIBLE. IF
NOT POSSIBLE, IT MUST BE TREATED WITH THE APPROPRIATE BMP'S.
18. SOLID WASTE MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA DISPOSAL
REQUIREMENTS.
19. NO VEHICLE WASHING ALLOWED ON SITE.
20. NO ENGINE DEGREASING IS ALLOWED ON SITE.
21. THE OWNER IS RESPONSIBLE FOR COMPLIANCE WITH ALL TERMS AND CONDITIONS OF THE PERMIT. THE
OPERATOR IS RESPONSIBLE FOR COMPLIANCE WITH SECTIONS 3, 4, 6-22, 24 AND APPLICABLE
REQUIREMENTS FOR CONSTRUCTION ACTIVITY IN SECTION 23.
22.TERMINATION OF COVERAGE-PERMITTEE(S) WISHING TO TERMINATE COVERAGE MUST SUBMIT A NOTICE
OF TERMINATION (NOT) TO THE MPCA. ALL PERMITTEE(S) MUST SUBMIT A NOT WITHIN 30 DAYS AFTER
THE FOLLOWING CONDITIONS HAVE BEEN MET:
A. PERMIT TERMINATION CONDITIONS, PER NPDES PERMIT SECTION 13.1 HAVE BEEN ACHIEVED ON
ALL PORTIONS OF THE SITE FOR WHICH THE PERMITTEE IS RESPONSIBLE.
A.A. PERMANENT UNIFORM PERENNIAL VEGETATIVE COVER MUST BE ESTABLISHED AT 70%
DENSITY OF ITS EXPECTED FINAL GROWTH.
A.B. THE PERMANENT STORMWATER TREATMENT SYSTEM IS CONSTRUCTED, MEETS ALL
REQUIREMENTS, AND IS OPERATING AS DESIGNED.
A.C. ALL TEMPORARY SYNTHETIC EROSION PREVENTION AND SEDIMENT CONTROL BMPS MUST BE
REMOVED.
A.D. CLEAN OUT SEDIMENT FROM CONVEYANCE SYSTEMS AND PERMANENT STORMWATER
TREATMENT SYSTEMS (RETURN TO DESIGN CAPACITY).
23. INSPECTIONS
A. INITIAL INSPECTION FOLLOWING SILT FENCE INSTALLATION BY CITY REPRESENTATIVE IS
REQUIRED.
B. EXPOSED SOIL AREAS: ONCE EVERY 7 DAYS AND WITHIN 24 HOURS FOLLOWING A 0.5" OVER 24
HOUR RAIN EVENT.
C. STABILIZED AREAS: ONCE EVERY 30 DAYS
D. FROZEN GROUND: AS SOON AS RUNOFF OCCURS OR PRIOR TO RESUMING
CONSTRUCTION.
E. INSPECTION AND MAINTENANCE RECORDS MUST BE RETAINED FOR 3 YEARS AFTER FILING OF THE
NOTICE OF TERMINATION AND MUST INCLUDE: DATE AND TIME OF ACTION, NAME OF PERSON(S)
CONDUCTING WORK, FINDING OF INSPECTIONS AND RECOMMENDATIONS FOR CORRECTIVE
ACTION, DATE AND AMOUNT OF RAINFALL EVENTS GREATER THAN 0.5 INCHES IN A 24 HOUR
PERIOD.
F. OBSERVE ANY DISCHARGE OCCURRING ONSITE AND DOCUMENT CORRECTIVE ACTIONS TAKEN.
DISCHARGE SHOULD BE DESCRIBED AND PHOTOGRAPHED.
24. MINIMUM MAINTENANCE
A. ALL NONFUNCTIONAL BMPS MUST BE REPAIRED, REPLACED, OR SUPPLEMENTED WITH
FUNCTIONAL BMPS BY THE END OF THE NEXT BUSINESS DAY AFTER DISCOVERY OR AS SOON AS
FIELD CONDITIONS ALLOW.
B. REPAIR, REPLACE, OR SUPPLEMENT ALL PERIMETER CONTROL DEVICES WHEN THEY BECOME
NONFUNCTIONAL OR THE SEDIMENT REACHES 1
2 THE HEIGHT OF THE DEVICE.
C. SEDIMENT BASINS DRAINED AND SEDIMENT REMOVED WHEN REACHES 1/2 STORAGE VOLUME.
D. SEDIMENT REMOVED FROM SURFACE WATERS WITHIN (7)SEVEN CALENDAR DAYS OF DISCOVERY.
E. CONSTRUCTION SITE EXITS INSPECTED, TRACKED SEDIMENT REMOVED WITHIN (1)ONE CALENDAR
DAY.
F. PROVIDE COPIES OF EROSION INSPECTION RESULTS TO CITY ENGINEER FOR ALL EVENTS GREATER
THAN 12" IN 24 HOURS.
25. THE SWPPP, INCLUDING ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS MUST BE
KEPT AT THE SITE DURING CONSTRUCTION ACTIVITY BY THE PERMITTEE(S) WHO HAVE OPERATIONAL
CONTROL OF THE SITE.
26. OWNER MUST KEEP RECORDS OF ALL PERMITS REQUIRED FOR THE PROJECT, THE SWPPP, ALL
INSPECTIONS AND MAINTENANCE, PERMANENT OPERATION AND MAINTENANCE AGREEMENTS, AND
REQUIRED CALCULATIONS FOR TEMPORARY AND PERMANENT STORM WATER MANAGEMENT SYSTEMS.
THESE RECORDS MUST BE RETAINED FOR THREE YEARS AFTER FILING NPDES NOTICE OF TERMINATION.
27. SWPPP MUST BE AMENDED WHEN:
A. THERE IS A CHANGE IN DESIGN, OPERATION, MAINTENANCE, WEATHER OR SEASONAL
CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON DISCHARGE
B. INSPECTIONS INDICATE THAT THE SWPPP IS NOT EFFECTIVE AND DISCHARGE IS EXCEEDING
WATER QUALITY STANDARDS.
C. THE BMP'S IN THE SWPPP ARE NOT CONTROLLING POLLUTANTS IN DISCHARGES OR IS NOT
CONSISTENT WITH THE TERMS AND CONDITIONS OF THE PERMIT.
28. CONCRETE WASHOUT AREA
A. THE WASHOUT AND CLEANOUT OF STUCCO, PAINT, CONCRETE, FORM RELEASE OILS, CURING
COMPOUNDS, AND OTHER CONSTRUCTION MATERIALS SHALL BE PROPERLY CONTAINED AND
DISPOSED OF. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND USING
APPROVED METHODS OF CONTAINMENT SUCH AS PRE-FABRICATED WASHOUT CONTAINERS,
CONCRETE WASHOUT TOTE, READY MIX TRUCKS WITH SELF-CONTAINED CHUTE CLEANOUT, ETC.
B. ALL SPILLS SHALL BE CLEANED UP IMMEDIATELY.
29. IN THE EVENT OF ENCOUNTERING A WELL OR SPRING DURING CONSTRUCTION CONTRACTOR TO CEASE
CONSTRUCTION ACTIVITY AND NOTIFY ENGINEER.
30. PIPE OUTLETS MUST BE PROVIDED WITH TEMPORARY OR PERMANENT ENERGY DISSIPATION WITHIN 24
HOURS AFTER CONNECTION TO A SURFACE WATER.
31. FINAL STABILIZATION
FINAL STABILIZATION REQUIRES THAT ALL SOIL DISTURBING ACTIVITIES HAVE BEEN COMPLETED AND
THAT DISTURBED AREAS ARE STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH 70% OF
THE EXPECTED FINAL DENSITY, AND THAT ALL PERMANENT PAVEMENTS HAVE BEEN INSTALLED. ALL
TEMPORARY BMP'S SHALL BE REMOVED, DITCHES STABILIZED, AND SEDIMENT SHALL BE REMOVED
FROM PERMANENT CONVEYANCES AND SEDIMENTATION BASINS IN ORDER TO RETURN THE POND TO
DESIGN CAPACITY.
32. RESPONSIBILITIES
A. THE OWNER MUST IDENTIFY A PERSON WHO WILL OVERSEE THE SWPPP IMPLEMENTATION AND
THE PERSON RESPONSIBLE FOR INSPECTION AND MAINTENANCE:
CONTACT: XXX
COMPANY: XXX
PHONE: XXX
B. THE OWNER MUST IDENTIFY THE A PERSON WHO WILL BE RESPONSIBLE FOR LONG TERM
OPERATIONS AND MAINTENANCE OF THE PERMANENT STORMWATER MANAGEMENT SYSTEM:
CONTACT: XXX
COMPANY: XXX
PHONE: XXX
33. THE WATERSHED DISTRICT OR THE CITY MAY HAVE REQUIREMENTS FOR INSPECTIONS OR AS-BUILT
DRAWINGS VERIFYING PROPER CONSTRUCTION OF THE BMPS.
34. EROSION CONTROL DEVICES CANNOT BE REMOVED UNTIL THE WATERSHED DISTRICT HAS DETERMINED
THE SITE HAS BEEN PERMANENTLY RESTABILIZED AND SHALL BE REMOVED WITHIN 30 DAYS THEREAFTER.
SWPPP NOTES CONSTRUCTION STORMWATER SPECIAL WATERS SEARCH MAP
SITE VICINITY MAP
PROJECT SITE
*
PROJECT SITE
*
PROPOSED
BUILDING
FFE=947.25
GFE=936.25
(COORDINATE W/
ARCHITECTURAL)
NO
PARKING
NO
PA
R
K
I
N
G
NO
PA
R
K
I
N
G
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 2P
NWL=DRY
HWL=932.73
64 LF 12" HDPE
@ 1.00%
62 LF 12" HDPE
@ 1.00%
31 LF 15" HDPE
@ 1.00%
73 LF 15" HDPE
@ 1.00%
161 LF 15" HDPE
@ 3.29%
21 LF 12" HDPE
@ 7.35%
187 LF 12" HDPE
@ 1.59%
48 LF 12" HDPE
@ 2.41%
28 LF 18" HDPE
@ 0.57%
40 LF 6" PVC
@ 4.07%
NYLOPLAST 44
RIM=945.09
INV(W)=941.09
NYLOPLAST 43
RIM=945.13
INV(E)=940.45
INV(W)=940.35
CBMH 42
RIM=945.66
INV(E)=939.73
INV(N)=939.73
INV(S)=939.53
CBMH 41
RIM=945.22
INV(N)=939.22
INV(S)=939.12
CBMH 40
RIM=944.52
SUMP=935.29
INV(N)=938.39
INV(NE)=938.39
INV(W)=938.39
INV(S)=938.29
TRENCH DRAIN 31
RIM=935.48
INV(E)=934.75
INV(W)=934.65
OUTLET=934.15
INSTALL TIDEFLEX CHECKMATE
ULTRAFLEX INLINE CHECK VALVE
(SEE DETAIL)
FES 30 W/ RIP-RAP
INV= 933.00
INV=933.00
CBMH 12
RIM=936.58
INV(N)=932.63
INV(W)=932.63
INV(S)=932.53
TRENCH DRAIN 13
RIM=935.48
INV(N)=934.75
INV(S)=934.65
OUTLET=934.15
INSTALL TIDEFLEX CHECKMATE
ULTRAFLEX INLINE CHECK VALVE
(SEE DETAIL)
CBMH 11
RIM=933.16
SUMP=926.16
INV(N)=929.56
INV(W)=929.16
INV(E)=929.16
FES 10 W/ RIP-RAP
INV= 929.00
RAIN GUARDIAN 23
RIM=937.91
RAIN GUARDIAN 22
RIM=939.51
RAIN GUARDIAN 21
RIM=938.15
RAIN GUARDIAN 20
RIM=933.60
60" PERFORATED CMP UNDERGROUND
FILTRATION SYSTEM 1P
(778 LF TOTAL)
TOP OF PIPE=935.00
OUTLET=930.00
INV=930.00
CONNECT TO EXISTING 8" WATERMAIN
(FIELD VERIFY SIZE, LOCATION, & MATERIAL)
5 LF 8" DIP WATERMAIN
8" 45° BEND
4 LF 8" DIP WATERMAIN
8" 45° BEND
167 LF 8" DIP WATERMAIN
8" WATER SERVICE STUB
(COORDINATE W/
MECHANICAL)
(VERIFY SIZE, INVERT, &
LOCATION W/ MECHANICAL)
EXTEND EX. SANITARY
SEWER SERVICE
INV(N)= 920.44±
(FIELD VERIFY EX.
LOCATION, SIZE, & INV.)
173 LF 6" SANITARY
@ 2.10%
6" SANITARY SEWER SERVICE
INV=924.08
(VERIFY LOCATION & INV. W/ MECHANICAL)
TRENCH DRAIN 40A
ACO KLASSIKDRAIN
168 LF W/ PARALLEL STORM SEWER PIPE
(SEE DETAIL)
APPROXIMATE
LOCATION OF FDC
(COORDINATE W/
MECHANICAL)
6" CLEANOUT
INV=928.00
(SEE DETAIL)
6" CLEANOUT
INV=928.00
(SEE DETAIL)
6" CLEANOUT
INV=928.00
(SEE DETAIL)
21 LF OF DRAINTILE
(SEE DETAIL)
12 LF OF DRAINTILE
(SEE DETAIL)
242 LF OF DRAINTILE
(SEE DETAIL)
44 LF 24" HDPE
@ 0.00%
INV=930.00
INV=930.00
6" CLEANOUT
INV=928.00
(SEE DETAIL)
216 LF OF DRAINTILE
(SEE DETAIL)
214 LF OF DRAINTILE
(SEE DETAIL)
207 LF OF DRAINTILE
(SEE DETAIL)
210 LF OF DRAINTILE
(SEE DETAIL)
27 LF OF DRAINTILE
(SEE DETAIL)
37 LF OF DRAINTILE
(SEE DETAIL)
94 LF OF DRAINTILE
(SEE DETAIL)
6" CLEANOUT
INV=928.00
(SEE DETAIL)
6" CLEANOUT
INV=928.00
(SEE DETAIL)
6" CLEANOUT
INV=928.00
(SEE DETAIL)
OCS 50
RIM=932.50
INV(N)=928.00
INV(S)=926.50
19 LF 12" HDPE
@ 1.33%
CONNECT TO EX. STRUCTURE
@ INV(N)=926.25
(FIELD VERIFY LOCATION,
SIZE, & INVERT)
ACCESS RISER 26
RIM=939.55
ACCESS RISER 25
RIM=939.11
ACCESS RISER 28
RIM=938.34
ACCESS RISER 27
RIM=938.27
6" CLEANOUT
INV=927.00
(SEE DETAIL)
INV=930.00
31 LF 24" HDPE
@ 0.00%
27 LF 24" HDPE
@ 0.00%
STMH 24
RIM=937.82
INV(W)=930.00
INV(S)=930.00
INV=930.00
19 LF 12" PVC
@ 2.00%
12" ROOF DRAIN STUB
INV(E)=933.00
(VERIFY SIZE, LOCATION,
& INV W/ MECHANICAL)
9 LF 12" PVC
@ 2.00%
12" ROOF DRAIN STUB
INV(S)=939.91
(VERIFY SIZE, LOCATION,
& INV W/ MECHANICAL)
21 LF 12" PVC
@ 2.00%
12" ROOF DRAIN STUB
INV(E)=938.81
(VERIFY SIZE, LOCATION,
& INV W/ MECHANICAL)
INV=940.00
6" CLEANOUT
INV=927.00
(SEE DETAIL)44 LF OF DRAINTILE
(SEE DETAIL)
52 LF OF DRAINTILE
(SEE DETAIL)
38 LF OF DRAINTILE
(SEE DETAIL)
31 LF OF DRAINTILE
(SEE DETAIL)
29 LF OF DRAINTILE
(SEE DETAIL)
24 LF OF DRAINTILE
(SEE DETAIL)
97 LF OF DRAINTILE
(SEE DETAIL)
6" CLEANOUT
INV=927.00
(SEE DETAIL)
BUILD OCS 1 OVER EX. LINE
RIM=932.00
INV(N)=927.00
INV(S)=925.63±
(FIELD VERIFY
LOCATION & INVERT)
15 LF OF DRAINTILE
(SEE DETAIL)
RIP-RAP OVERFLOW
(SEE DETAIL)
RIP-RAP OVERFLOW
(SEE DETAIL)
33 LF 12" HDPE
@ 1.18%
26 LF 12" HDPE
@ 1.18%
CB 62
RIM=936.30
INV(W)=932.30
CBMH 61
RIM=936.51
SUMP=928.89
INV(E)=931.99
INV(NW)=931.89
FES 60 W/ RIP-RAP
INV= 931.50
CB 71
RIM=933.92
INV(E)=929.92
40 LF 12" HDPE
@ 1.59%
CBMH 70
RIM=932.92
INV(W)=929.28
INV(E)=929.28
25 LF 12" HDPE
@ 0.50%
30 LF 15" RCP
@ 3.51%
FES 80
INV=932.57
CONNECT TO EX. STRUCTURE
@ INV(NW)=931.50
(FIELD VERIFY LOCATION,
SIZE, & INVERT)
N
SCALE IN FEET
0 20 40
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
4
-
1
U
T
I
L
I
T
Y
P
L
A
N
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
7
:
4
0
A
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
PARKING STALL COUNT
ACCESSIBLE PARKING STALL
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATION
SIGN
LIGHT POLE
POWER POLE
WATER MANHOLE / WELL
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
SANITARY SEWER SERVICE
WATER SERVICE
ELECTRIC METER
GAS METER
TREE LINE
EXISTING PROPOSED
972
DRAINTILE
FORCEMAIN
PARKING SETBACK LINE
BUILDING SETBACK LINE
2
FENCE
FLARED END SECTION
POST INDICATOR VALVE
BENCHMARK
SOIL BORING
DIRECTION OF FLOW 1.0%
972.5
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
GENERAL NOTES
SEE SHEET C1-3 FOR LOUCKS STANDARD NOTES.
UTILITY PLAN
C4-1
LOUCKS IS PLEASED TO OFFER
CONSTRUCTION STAKING SERVICES.
PLEASE CONTACT BRIAN PECHACEK FOR
INQUIRIES.
EMAIL: BPECHACEK@LOUCKSINC.COM
PHONE: 763.424.5505
CONSTRUCTION STAKING
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
8
-
1
C
I
V
I
L
D
E
T
A
I
L
S
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
8
:
5
A
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
CIVIL DETAILS
C8-1
FINGER DRAIN
DETAIL
DRAWN 2/2016
LOUCKS PLATE NO.
LOUCKS
8"8"
6" MIN.
CL. 5 AGG. BASE
BIT. BASE
BIT. WEAR
PEA ROCK OR WASHED
GRAVEL IN THIS AREA MIRAFI 140-S FILTER
FABRIC SOCK
4" PERFORATED PVC
PIPE - SDR 35
4" PERFORATED PVC
PIPE - SDR 35 W/
FABRIC SOCK
GROUT INSIDE & OUTSIDE
OF CATCH BASIN
NOTE: TYPICAL LENGTH = 20 L.F.
CUSTOM PEDESTRIAN GATE
DRAWN 8/2025
LOUCKS PLATE NO.
LOUCKS
5'
-
2
"
4" X 4" TUBE
STEEL POST
5'
-
2
"
4'-0"
SEE PLAN
2" X 3" TUBE
STEEL POST
2'-0"
MIN.
1'-5"
MIN.
1'-0"
MIN.
HATCHED AREA TO BE FLAT (1.50% MAX
SLOPE IN ANY DIRECTION) AND BE CLEAR
OF ALL OBSTRUCTIONS INCLUDING
COLUMNS, PLANTINGS, ETC.
NOTE: ALL OPENING HARDWARE TO BE 48"
HIGH MAXIMUM PER A.D.A FRONT
APPROACH REACH RANGE.
6'-0" MINIMUM
WALK WIDTH
CUSTOM
NOTES:
1. POST SIZE DEPENDS ON FENCE HEIGHT, WEIGHT, AND WIND LOADS. SEE MONTAGE II
SPECIFICATIONS FOR POST SIZING CHART.
2. SEE AMERISTAR GATE TABLE FOR STANDARD OUT TO OUTS.
3. GATE HARDWARE TO MEET OWNERS SECURITY REQUIREMENTS.
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
8
-
1
C
I
V
I
L
D
E
T
A
I
L
S
Pl
o
t
t
e
d
:
0
5
/
2
6
/
2
0
2
6
3
:
3
1
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
CIVIL DETAILS
C8-2
STANDARD GUTTER
8"12"
6"
13.5"
1
2" RAD.
MIN. OF 4" AGG. BASE
UNDER CURB (IF TOTAL
THICKNESS OF
SECTION ALLOWS)
3/8 " LIP
3" RAD.
1
3
3" RAD.
AGG. BASE
VARIES
SLOPE GUTTER TO
MATCH PARKING LOT
DRAINAGE
(3/4" PER FT. TYP.) TIP
GUTTER OUT AS REQ'D
B6-12 STYLE
CONCRETE CURB
AND GUTTER
MINIMUM 1'
BEHIND BACK
OF CURB
7"
SPECIFICATION NOTES:
1. UPON COMPLETION, CURBING SHOULD BE SPRAYED WITH A
MEMBRANE CURING COMPOUND PER MNDOT 3754.
2. EXPANSION JOINTS AT MAX. SPACING OF 200'.
3. CONSTRUCT IN ACCORDANCE WITH MNDOT 2531.
DRAWN 2/2016
LOUCKS PLATE NO.
2009LOUCKS FLAT CURB AND
GUTTER (12")
DRAWN 2/2016
LOUCKS PLATE NO.
2012LOUCKS
SLOPE GUTTER TO MATCH
PARKING LOT DRAINAGE
TIP GUTTER OUT AS REQ'D
PAVEMENT SECTION VARIES
MIN. OF 4"
3/8 " LIP
AGG. BASE UNDER
CURB (IF TOTAL
THICKNESS OF
SECTION ALLOWS)
7"
12"8"
AGG. BASE
VARIES
1/2" RAD.
20"
SPECIFICATION NOTES:
1. UPON COMPLETION, CURBING SHOULD BE SPRAYED WITH A
MEMBRANE CURING COMPOUND PER MNDOT 3754.
2. EXPANSION JOINTS AT MAX. SPACING OF 200'.
3. CONSTRUCT IN ACCORDANCE WITH MNDOT 2531.
CONCRETE SIDEWALK-
WIDTH & SECTION VARY
REFER TO SITE PLAN
2" BIT. WEAR COURSE,
MN/DOT 2360 SPWEA240C
TACK COAT, MN/DOT 2357
2" BIT. NON-WEAR COURSE,
MN/DOT 2360 SPNWB230C
6" AGG. BASE, CLASS 5 OR 2 MN/DOT 3138
APPROVED SUBGRADE
FINISHED GRADE
24" SELECT GRANULAR, MN/DOT 3149.D
STANDARD BITUMINOUS
PAVEMENT SECTION
PAVEMENT SECTION BASED ON
GEOTECHNICAL REPORT BY _____, DATED
_____,20__
GEOTEXTILE FILTER FABRIC TYPE V,
MN/DOT 3733.2
DRAWN 12/2016
LOUCKS PLATE NO.
2031LOUCKS
2" BIT. WEAR COURSE,
MN/DOT 2360 SPWEA340C
TACK COAT, MN/DOT 2357
2" BIT. NON-WEAR COURSE,
MN/DOT 2360 SPNWB330C
6" AGG. BASE, CLASS 5 OR 2 MN/DOT 3138
APPROVED SUBGRADE
FINISHED GRADE
24" SELECT GRANULAR, MN/DOT 3149.D
HEAVY DUTY BITUMINOUS
PAVEMENT SECTION
PAVEMENT SECTION BASED ON
GEOTECHNICAL REPORT BY _____, DATED
_____,20__
GEOTEXTILE FILTER FABRIC TYPE V,
MN/DOT 3733.2
DRAWN 01/2022
LOUCKS PLATE NO.
2032LOUCKS
8" COMPACTED AGGREGATE BASE CL. 5 OR 2
MN/DOT 3138
APPROVED SUBGRADE
FINISHED GRADE
6" CONCRETE MN/DOT 2301
CONCRETE PAVEMENT
SECTION
NOTES:
1. CONCRETE 6" THICK OR LESS SHALL BE REINFORCED WITH WELDED WIRE
FABRIC OR REINFORCING BARS. CONCRETE 7" THICK OR GREATER SHALL
BE REINFORCED PER GEOTECHNICAL RECOMMENDATIONS.
2. SAWED OR FORMED CONTROL JOINTS SHOULD BE INCLUDED FOR EACH
225 SQUARE FEET OF AREA OR LESS (15 FEET BY 15 FEET).
3. SAW CUTS SHOULD NOT CUT THROUGH THE WELDED WIRE FABRIC OR
REINFORCING STEEL AND DOWELS SHOULD BE UTILIZED AT FORMED
AND/OR COLD JOINTS.
DRAWN 12/2016
LOUCKS PLATE NO.
2033LOUCKS
CONCRETE SIDEWALK
SECTION
4" CONCRETE WALK
MN/DOT 2521
4" GRANULAR MATERIAL
MN/DOT 3149
DRAWN 12/2016
LOUCKS PLATE NO.
2034LOUCKS BOLLARD
1/2" CROWN
1" CROWN
3'
-
6
"
3'
-
0
"
6"
24" DIA.
4,000 PSI
CONCRETE
6" DIP, CONC.
FILLED, PAINTED
OSHA YELLOW
DRAWN 12/2016
LOUCKS PLATE NO.
2039LOUCKSTYPICAL ADA PARKING
STALL STRIPING
DRAWN 03/2017
LOUCKS PLATE NO.
2037LOUCKS
LCC
4" WIDE PAINTED
LINES, TRAFFIC
WHITE
4" WIDE PAINTED LINES,
18" O.C., @ 45 DEG. TRAFFIC WHITE
(AISLE TO CONTAIN THE DESIGNATION
"NO PARKING" COMPLYING WITH
MSBC 1341.0502 IF ACCESS AISLE
SIGNS ARE NOT SHOWN
REFER TO SITE PLAN FOR ADA
PARKING SIGN LOCATION. NO SIGNS TO BE LOCATED
WITHIN ACCESSIBLE ROUTE.
REFER TO SITE PLAN FOR
ACCESS AISLE SIGN LOCATION
(AISLE TO CONTAIN THE DESIGNATION
"NO PARKING" COMPLYING WITH
MSBC 134.0502 IF ACCESS AISLE
SIGNS ARE NOT SHOWN). NO SIGNS TO BE
LOCATED WITHIN ACCESSIBLE ROUTE
REFER TO SITE PLAN
FOR STALL DIMENSIONS
40
"
PROVIDE PAINTED
INTERNATIONAL SYMBOL OF
ACCESSIBILITY AT EACH
DESIGNATED HANDICAP
PARKING STALL. CENTER
SYMBOL IN STALL.
HC SIGNAGE PER MINNESOTA
RULES 1341.0502
ALL LINES 4" WIDE
8" DIAMETER
NOT TO SCALE
67.5°
5°
36"
CONCRETE PAVEMENT
REFER TO SITE PLAN AND
SECTION DETAIL
VANACCESSIBLE
60
"
-
6
6
"
48
"
12" DIA.
36
"
TYPICAL ADA PARKING
SIGN / BOLLARD COMBO
12x18" STANDARD HANDICAP PARKING
SIGN WITH SEPARATE 'VAN ACCESSIBLE'
PANEL. WHITE LEGEND ON BLUE
BACKGROUND. USE HARDWARE PER
SIGN SUPPLIER'S RECOMMENDATIONS.
HC SIGNAGE PER MINNESOTA
RULES 1341.0502
12x6" STANDARD 'VAN
ACCESSIBLE' PANEL. WHITE
LEGEND ON BLUE BACKGROUND
2" DIA. 6' LONG MIN.
GALVANIZED SCHEDULE 40
STEEL PIPE. EMBED IN
CONCRETE FILLED BOLLARD
6" DIA. SCHEDULE 40
GALVENZIED STEEL PIPE 6'
LONG MINIMUM
HEAVY DUTY HDPE DOME TOP
DECORATIVE SLEEVE BLUE IN COLOR.
AVAILABLE FROM
BOLLARDSNSLEEVES.COM OR EQUAL.
COMPACTED OR
UNDISTURBED SUBGRADE.
NOTES:
1. BOLLARDS TO BE PLACED 12" BEHIND
BACK OF CURB.
2. MAINTAIN PLUMB UNTIL CONCRETE IS
SUFFICIENTLY CURED.
3. HOLD CONCRETE FOOTING BELOW
GRADE OF FINISHED CONCRETE TO
CREATE FINAL PAVING PATTERN AS
SHOWN ON PLANS.
DRAWN 12/2016
LOUCKS PLATE NO.
2038LOUCKS
6"
PARKING
VEHICLE IDREQUIRED
UP TO $200 FINEFOR VIOLATION
TRAFFIC SIGN
3#/FT.
3#/FT.
TRAFFIC SIGN SPECIFICATIONS
STOP SIGN SHALL BE R1-1, 30"X30" OR AS
DIRECTED BY ENGINEER.
MATERIAL
ALUMINUM SHALL BE 5052-H38 OR 6061-T6
ALLOY.
GAUGE SHALL BE 0.080 ON THE LONGEST
SIDE UP TO 30", 0.100 ON THE LONGEST SIDE
OVER 30".
REFLECTIVE SHEETING SHALL BE DIAMOND
GRADE VIP.
ALL SIGNS SHALL CONFORM TO MN/DOT
3352, SIGNS, DELINEATORS AND MARKERS -
STANDARD SPECIFICATIONS FOR
CONSTRUCTION.
CHANNEL POST SPECIFICATIONS
STEEL CHANNEL POSTS SHALL WEIGH 3LB.
/FT.
POSTS SHALL BE OF THE 4-RIB DESIGN,
GALVANIZED AND PUNCHED ON 1" CENTERS.
3'
-
0
"
7'
-
0
"
IF INSTALLED IN PAVEMENT, INSTALL
V-LOC ANCHOR OR APPROVED EQUAL.
DRAWN 12/2016
LOUCKS PLATE NO.
2041LOUCKS
NOTE:
GRANULAR MATERIALS FURNISHED FOR USE IN FOUNDATION, BEDDING, ENCASEMENT, OR BACKFILL
CONSTRUCTION SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:
·FOUNDATION MATERIALS SHALL HAVE 100% PASSING THE 1 1/2" SIEVE AND A MAXIMUM OF 10%
PASSING THE No. 4 SIEVE. NOT LESS THAN 50% OF THE MATERIAL RETAINED BY THE No. 4 SIEVE SHALL
HAVE ONE (1) OR MORE CRUSHED FACES. HARD, DURABLE CRUSHED CARBONATE QUARRY ROCK MAY
BE USED FOR FOUNDATION MATERIALS.
·BEDDING AND ENCASEMENT MATERIALS FOR FLEXIBLE PIPE SHALL MEET THE REQUIREMENTS OF
MNDOT SPECIFICATION 3149.2B1, GRANULAR BORROW, EXCEPT THAT 100% SHALL PASS THE ONE
INCH (1") SIEVE.
·BACKFILL MATERIALS SHALL CONSIST OF SUITABLE EXISTING TRENCH MATERIALS, EXCEPT AS
OTHERWISE SPECIFIED. SUITABLE MATERIAL SHALL BE DEFINED AS A MINERAL SOIL FREE OF FOREIGN
MATERIALS (RUBBISH, ORGANICS & DEBRIS), FROZEN CLUMPS, OVERSIZE STONE, ROCK, CONCRETE
OR BITUMINOUS CHUNKS, AND OTHER UNSUITABLE MATERIALS THAT MAY DAMAGE PIPE, PREVENT
THOROUGH COMPACTION, OR INCREASE THE RISKS OF SETTLEMENT.
PLASTIC PIPE
BEDDING
PLASTIC
PIPE
18"18"PIPE
WIDTH ENCASEMENT
BEDDING
FOUNDATION
(MAY NOT BE
REQUIRED)
12"
6"
BACKFILL
COMPACTED
AS SPECIFIED
EXCAVATED TRENCH
WIDTH
DRAWN 2/2016
LOUCKS PLATE NO.
4008LOUCKS CONCRETE PIPE
BEDDING
RCP
PIPE
18"18"PIPE
WIDTH
COMPACTED SAND OR 3 4"
TO 1-1
2" CLEAR ROCK (AS
DIRECTED)
COMPACTED
SUBGRADE
6"
COMPACTED
BACKFILL
EXCAVATED TRENCH
WIDTH
RCP
PIPE
18"18"PIPE
WIDTH
SHAPE BOTTOM OF
EXISTING TRENCH MATERIAL
TO FIT PIPE BARREL.
COMPACTED
BACKFILL
EXCAVATED TRENCH
WIDTH
CLASS C BEDDING
CLASS B BEDDING
DRAWN 2/2016
LOUCKS PLATE NO.
4310LOUCKS
NOTE:
CONTRACTOR TO PROVIDE RETAINING WALL
DESIGN/SHOP DRAWINGS SIGNED BY A
PROFESSIONAL ENGINEER FOR APPROVAL
PRIOR TO CONSTRUCTION.
CONTRACTOR TO SUBMIT SHOP DRAWINGS
FOR THE FENCE WITH ANCHOR SYSTEM
EMBEDDED INTO THE 'SLEEVE IT' FOOTING
ANCHOR FOR APPROVAL PRIOR TO
CONSTRUCTION.
DRAWN 2/2016
LOUCKS PLATE NO.
2047RETAINING WALLLOUCKS
"SLEEVE IT"
ANCHOR SYSTEM
SEE DETAIL
GEOGRID AS
REQUIRED
UNDISTURBED SOIL
OR COMPACTED FILL
CRUSHED OR
COMPACTED ROCK
(NO CARBONATES)
4" PERFORATED PIPE
(NO SOCK)
6" CLASS 5,
COMPACTED TO 95%
STANDARD PROCTOR
RETAINING WALL
MODULAR BLOCK UNIT
RETAINING WALL
CAP UNIT
RETAINING WALL INFORMATION:
·CMU MANUFACTURER: TBD
(OR APPROVED EQUAL)
·TYPE: TBD
(OR APPROVED EQUAL)
·COLOR: PROVIDE STANDARD
COLOR SAMPLES FOR
SELECTION BY LANDSCAPE
ARCHITECT
·PROVIDE CAP TO MATCH
·FINAL MATERIAL SELECTIONS
TO BE APPROVED BY OWNER
48
"
M
I
N
.
NON-WIND LOADED
FENCE OR RAILING
(SEE LANDSCAPE)
VEGETATION
(SEE LANDSCAPE)
NOTE:
GRANULAR MATERIALS FURNISHED FOR USE IN FOUNDATION, BEDDING, ENCASEMENT, OR BACKFILL
CONSTRUCTION SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:
·FOUNDATION MATERIALS SHALL HAVE 100% PASSING THE 1 1/2" SIEVE AND A MAXIMUM OF 10%
PASSING THE No. 4 SIEVE. NOT LESS THAN 50% OF THE MATERIAL RETAINED BY THE No. 4 SIEVE SHALL
HAVE ONE (1) OR MORE CRUSHED FACES. HARD, DURABLE CRUSHED CARBONATE QUARRY ROCK MAY
BE USED FOR FOUNDATION MATERIALS.
ROCK BEDDING MATERIALS SHALL BE 3/4" TO 1-1/2" CLEAR ROCK. IF IN-SITU MATERIAL UNDER ROCK
BEDDING IS UNSTABLE, USE AS MUCH ROCK AS NECESSARY TO STABILIZE.
DUCTILE IRON PIPE
BEDDING
D.I.P.
PIPE
18"18"PIPE
WIDTH
12"
4"
EXCAVATED TRENCH
WIDTH
D.I.P.
PIPE
18"18"PIPE
WIDTH
12"
4"
EXCAVATED TRENCH
WIDTH
SAND
BEDDING
ROCK
BEDDING
DRAWN 2/2016
LOUCKS PLATE NO.
4615LOUCKS
INV=
FLOW
OUTLET PIPE
OPEN GRATE
3/4" NOMINAL
ANNULAR
SPACE 14"
8" PVC
12"
1-1/2"
NEENAH TRENCH GRATE R-4990-DX
OR EQUAL
TRENCH DRAIN /
OUTLET DETAIL
GROUTED
CONNECTION
8"-90° BEND
BLISTER
CONCRETE
AROUND
CASTING, TO
PROVIDE 0.2'
SUMP FOR
SEDIMENT
STORAGE.
DRAWN 2/2016
LOUCKS PLATE NO.
4319LOUCKS
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
8
-
1
C
I
V
I
L
D
E
T
A
I
L
S
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
8
:
5
A
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
CIVIL DETAILS
C8-3
FILTRATION BASIN
DETAIL
DRAWN 04/2026
LOUCKS PLATE NO.
CUSTOMLOUCKS
SLOPES VARIES -
3:1 MAX
TOP OF BERM -
SEE GRADING
PLAN FOR ELEVATION
SLOPES VARIES -
3:1 MAX
WQV
100-YEAR HWL
BIORETENTION SOIL
DRAINAGE LAYER
PERFORATED PIPE
SEED MIX
(SEE LANDSCAPE)
A A
SECTION A-A
PLAN VIEW
NOTE: SEE MINNESOTA STORMWATER MANUAL FOR MATERIAL SPECIFICATION RECOMMENDATIONS FOR
BIORETENTION SOIL, MULCH, UNDERDRAIN, ETC.NOT TO SCALE
NOTE: SEE GRADING, SITE, & STORM SEWER
PLANS FOR BASIN DIMENSIONS, LOCATION,
ELEVATIONS, ETC.
6"
18
"
M
I
N
.
CONSTRUCTION SEQUENCING FOR BASIN
1. INSTALL APPROPRIATE TEMPORARY EROSION CONTROL DEVICES
TO PREVENT SEDIMENT FROM LEAVING OR ENTERING THE
PRACTICE DURING CONSTRUCTION.
2.ALL DOWN GRADIENT PERIMETER CONTROL BMP'S MUST BE IN
PLACE BEFORE ANY GRADIENT AND DISTURBING ACTIVITY BEGINS.
3.PERFORM CONTINUOUS INSPECTIONS OF EROSION CONTROL
PRACTICES.
4.INSTALL ALL UTILITIES (WATER, SANITARY, ELECTRIC, GAS, ETC.)
PRIOR TO SETTING FINAL GRADE OF FILTRATION DEVICE.
5.ROUGH GRADE SITE. IF FILTRATON AREA IS BEING USED AS
TEMPORARY SEDIMENT BASIN DURING CONSTRUCTION, LEAVE A
MINIMUM OF 1' COVER OVER THE PRACTICE TO PROTECT THE
UNDERLYING SOILS FROM CLOGGING.
6.COMPLETE, STABILIZE, AND VEGETATE ALL OTHER SITE
IMPROVEMENTS.
7.CONSTRUCT AND VEGETATE FILTRATION DEVICE FOLLOWING
STABILIZATION OF CONTRIBUTING DRAINAGE AREA. ENSURE THAT
CRITICAL ELEVATIONS, SUCH AS UNDERDRAIN INVERT, TOP OF
MEDIA, AND INVERT OF OVERFLOW STRUCTURE (IF PRESENT) ARE
CORRECT.
8.REMOVE TEMPORARY EROSION CONTROL DEVICES AFTER THE
CONTRIBUTING DRAINAGE AREA IS ADEQUATELY ESTABLISHED.
9.CONTRACTOR TO HAVE DOUBLE RING INFILTROMETER TEST DONE
AFTER FILTRATION BASIN CONSTRUCTION TO VERIFY INFILTRATION
RATES.
GENERAL NOTES
1.IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BMP DURING
OR IMMEDIATELY FOLLOWING EXCAVATION, THIS MATERIAL SHALL BE
REMOVED FROM THE PRACTICE PRIOR TO CONTINUING CONSTRUCTION.
2.SEE MINNESOTA STORMWATER MANUAL FOR SUBGRADE PREPARATION.
3.GRADING OF THE FILTRATION AREAS SHALL BE ACCOMPLISHED USING
LOW IMPACT EARTH MOVING EQUIPMENT TO PREVENT COMPACTION OF
THE FILTRATION SOILS OR DAMAGE TO THE UNDERDRAIN.
4.RUNOFF MUST FILTRATE WITHIN 48-HOURS. BASINS UNABLE TO
MAINTAIN THESE RATES MUST BE DEEP TILLED, RE-GRADED, AND IF
NECESSARY REPLANTED TO RESTORE ORIGINAL FILTRATION RATES.
5.ALL WORK TO BE CONDUCTED IN CONFORMANCE WITH APPLICABLE
LOCAL, REGIONAL, AND STATE STORMWATER STANDARDS FOR THE
PROJECT SITE AS APPROVED BY THE REGULATORY ENGINEER.
6.REFER TO LANDSCAPE PLAN FOR PLANTING REQUIREMENTS.
15"
18
"
GENERAL NOTES:
AGGREGATE BASE
4" CLEAN COMPACTED
TYP.
1/2" R.
#4 @ 12" O.C.
#4 @ 18" O.C.
#3 NOSING TYP.
TYP
6"
TY
P
1. ALL REBAR TO BE COVERED BY 2" CONCRETE MIN
2. CONCRETE SURFACING TO BE MEDIUM BROOM FINISH PERPENDICULAR TO
PEDESTRIAN CIRCULATION.
3. HANDRAIL AND POSTS TO BE 1-1/2" O.D. SCHED. 40 HOT DIPPED
GALVANIZED STEEL PIPE
4. SUBMIT SHOP DRAWING FOR HAND RAIL.S
5. ALL WELDS SHALL BE CONTINUOUS AND GROUND SMOOTH.
6. PAINT HANDRAIL WITH ONE COAT OF PRIMER AND TWO FINISH COATS -
BLACK IN COLOR. PAINT THICKNESS SHALL BE 6 MILS. (SEE SPECS)
7. SET RAILING POSTS 6" FROM OUTSIDE EDGE OF STAIRS - BOTH SIDES
8. SURFACE MOUNT WITH 4-1/2"x1/2" KWIK BOLT TZ BY HILTI, USE LEAD SHIMS
UNDER BASEPLATE TO PLUM RAILINGS
12"
R
6
"
6' MAX SPACING
12
"
WELD (TYP)
6"
15"
36
"
12"
R6"
30"
EJ
EJ
36
"
36
"
CONCRETE STAIR AND
RAILING
LOUCKS PLATE NO.
DRAWN 08/2025
CUSTOMLOUCKS
OR APPROVED EQUAL
APPROVED RESILIENT RUBBER JOINT
MUST BE USED TO MAKE WATERTIGHT
CONNECTIONS TO MANHOLES, CATCH
BASINS, AND OTHER STRUCTURES.
2
1
EMERGENCY OVERFLOW-
CLASS 2 RIP RAP OVER
GEOTEXTILE FABRIC
10' TYP
.
4' T
Y
P
.
BASIN OVERFLOW
TOP OF BERM
OVERFLOW ELEVATION
AS SPECIFIED
PONDING
AREA
AS SPECIFIED
DRAWN 2/2016
LOUCKS PLATE NO.
3010LOUCKS
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
C
I
V
I
L
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
C
8
-
1
C
I
V
I
L
D
E
T
A
I
L
S
Pl
o
t
t
e
d
:
0
5
/
2
6
/
2
0
2
6
3
:
3
2
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Professional Engineer under the
laws of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Samuel R. Trebesch - PE
56088
260128.00
SRT
LAH
SRT
05/26/2026
SWPPP
PRELIM
I
N
A
R
Y
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
CIVIL DETAILS
C8-4
OR APPROVED EQUAL
GRATE TO BE ADA ACCESSIBLE.
COLOR AND PATTERN TO BE
APPROVED BY OWNER.
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
L
A
N
D
S
C
A
P
E
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
L
0
-
1
T
R
E
E
P
R
E
S
E
R
V
A
T
I
O
N
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
1
2
:
1
3
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Kevin V. Kroen - LA
53757
260128.00
SRT
LJR/KVK
KVK
05/26/2026
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
SWPPP
PRELIM
I
N
A
R
Y
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
TREE
INVENTORY
L0-1
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
CITY OF ARDEN HILLS TREE PRESERVATION REQUIREMENTS AND STANDARDS:
1. TREE REMOVAL ALLOWANCE. MITIGATION SHALL NOT BE REQUIRED FOR REMOVING, CUTTING, OR KILLING TREES WHEN:
1.A. FEWER THAN TEN (10) PERCENT OF THE CALIPER INCHES OF THE SIGNIFICANT TREES ON THE PROPERTY ARE CUT, REMOVED, OR KILLED
1.B. THERE IS AN EXISTING PRINCIPAL USE ON THE PROPERTY AND NO CONSTRUCTION, GRADING, OR DEVELOPMENT IS TO OCCUR IN THE LOCATION OF THE
REMOVED TREE(S) WITHIN TWO YEARS THEREAFTER.
1.C. THE TREES TO BE REMOVED, CUT, OR KILLED ARE IDENTIFIED AS DISEASED OR NUISANCE TREES.
2. MITIGATION STANDARDS. MITIGATION FOR TREE REMOVAL OF SIGNIFICANT TREES MUST MEET THE FOLLOWING SPECIFIC STANDARDS;
2.A. MITIGATION RATE. SIGNIFICANT LIVE TREES LOST OR REASONABLY ANTICIPATED TO BE LOST AS A RESULT OF BUILDING, CONSTRUCTION, OR GRADING
IMMEDIATELY OR IN THE FUTURE, SHALL BE REPLACED BY THE PROPERTY OWNER BY PLANTING THAT NUMBER OF CALIPER INCHES OF TREES ("REPLACEMENT
TREES") DETERMINED AT A RATE OF 1:2 OR ONE INCH REPLACED FOR EVERY TWO INCHES LOST. THE TREES REQUIRED TO BE REPLACED PURSUANT TO THIS
SECTION SHALL BE IN ADDITION TO ANY OTHER TREES REQUIRED TO BE PLANTED PURSUANT TO ANY OTHER PROVISION OF THE CODE.
2.B. MITIGATION SPECIES. REPLACEMENT TREES SHALL BE OF A SPECIES SIMILAR TO THE TREES WHICH ARE LOST OR REMOVED AND SHALL INCLUDE THOSE SPECIES
PRE-APPROVED IN WRITING BY THE CITY. THE CITY MAINTAINS A LIST OF TREES PROVIDED FOR GUIDANCE IN SELECTION OF TREES AND SHRUBS.
2.C. GENERAL MITIGATION STANDARDS.
2.C.A. ALL REPLACEMENT TREES SHALL MEET THE AMERICAN STANDARDS FOR NURSERY STOCK RELATING TO QUALITY OF STOCK AND APPROPRIATE SIZING OF
THE ROOT BALL FOR BALLED AND BURLAPPED AND SPADE-MOVED TREES.
2.C.B. TREES PLANTED IN ACCORDANCE WITH MITIGATION REQUIREMENTS SHALL NOT BE COMPRISED OF MORE THAN 25 PERCENT OF THE SAME SPECIES OR
SIZE UNLESS APPROVED BY THE CITY.
2.C.C. REPLACEMENT TREES SHALL BE PLANTED ON THE SAME PROPERTY FROM WHICH THE TREES WERE REMOVED. IF THE CITY DETERMINES, AT ITS SOLE
DISCRETION, THAT THE NUMBER OF REPLACEMENT TREES TO BE PLANTED EXCEEDS THE NUMBER OF TREES THAT CAN BE ACCOMMODATED PRACTICALLY
ON-SITE, OFF-SITE PLANTING MAY OCCUR AT LOCATIONS TO BE DETERMINED BY THE CITY, OR A LANDSCAPING FEE IN LIEU OF OFF-SITE PLANTING MAY
BE REQUIRED AS PROVIDED IN PARAGRAPH D BELOW.
2.C.D. WHERE TREE REPLACEMENT ON-SITE IN SATISFACTION OF SUBD. 6.A ABOVE IS NOT PRACTICAL AND A SUITABLE OFF-SITE LOCATION CANNOT BE
DETERMINED BY THE CITY, A LANDSCAPING FEE IN LIEU THEREOF MAY BE ASSESSED FOR THE REPLACEMENT REQUIRED. THE LANDSCAPING FEE AMOUNT
SHALL BE THE COST OF MATERIALS AND INSTALLATION OF TREE(S), PLUS TEN (10) PERCENT, AND SHALL BE PROVIDED BY THE APPLICANT AND APPROVED
BY THE CITY. ALL LANDSCAPING FUNDS COLLECTED SHALL BE EXPENDED EXCLUSIVELY TOWARDS LANDSCAPING, AS DEFINED BY THE ORDINANCE, FOR
IMPLEMENTATION OF THE GOALS LISTED IN SUBD. 1 OF THIS SECTION AND SECTION 1325.05, SUBD. 1.A.
2.C.E. DEVELOPMENT THAT IS SUBJECT TO THE LANDSCAPE REQUIREMENTS IN SECTION 1325.05 OF THE ZONING CODE MAY COUNT RESERVED TREES
TOWARDS THE REQUIRED LANDSCAPING PLAN. THE PLANTING OF TREES FOR MITIGATION SHALL BE IN ADDITION TO THE LANDSCAPE REQUIREMENTS
OF SECTION 1325.05 AND SHALL BE REPLACED IN ACCORDANCE WITH PARAGRAPH C AND/OR D ABOVE.
2.C.F. THE REQUIRED MITIGATION TREES SHALL BE REPLACED BY THE PROPERTY OWNER OR ORIGINAL DEVELOPER IF THEY HAVE DIED OR HAVE SEVERELY
DECLINED AFTER THE SECOND FULL GROWING SEASON FOLLOWING INSTALLATION. A TREE SHALL BE CONSIDERED TO BE SEVERELY DECLINED IF MORE
THAN 25 PERCENT OF THE CROWN HAS DIED.
2.D DEFINITION OF SIGNIFICANT TREE IS A TREE THAT IS IMPORTANT TO THE SITE AND THE NEIGHBORHOOD CHARACTER, THAT IS STRUCTURALLY SOUND AND
HEALTHY, AND THAT MEETS AT LEAST ONE OF THE FOLLOWING STANDARDS: (REVISED 04/28/08)
2.D.A. A DECIDUOUS HARDWOOD TREE THAT IS AT LEAST TEN (10) CALIPER INCHES, INCLUDING BUT NOT LIMITED TO, IRONWOOD, CATALPA, OAK,
HARD MAPLE, WALNUT, HICKORY, BIRCH, BLACK CHERRY, HACKBERRY, LOCUST AND BASSWOOD.
2.D.B. A DECIDUOUS SOFTWOOD TREE THAT IS AT LEAST TWELVE (12) CALIPER INCHES, INCLUDING BUT NOT LIMITED TO, COTTONWOOD,
POPLARS/ASPEN, BOX ELDER, WILLOW, SILVER MAPLE AND ELM.
2.D.C. A CONIFEROUS EVERGREEN TREE HAVING FOLIAGE ON THE OUTERMOST PORTION OF THE BRANCHES YEAR-ROUND AND WHICH IS AT LEAST
FIFTEEN (15) FEET OR MORE IN HEIGHT.
2.D.D A GROUP OF DECIDUOUS TREES THAT ARE AT LEAST EIGHT (8) CALIPER INCHES OR CONIFEROUS TREES THAT ARE AT LEAST FIFTEEN (15) FEET IN
HEIGHT, THAT PROVIDE A BUFFER OR SCREENING ALONG AN ADJACENT PUBLIC STREET OR BETWEEN DIFFERING LAND USES.
3. PRIOR TO CONSTRUCTION. BEFORE CONSTRUCTION, GRADING OR LAND CLEARING BEGINS; TREES OR TREE AREAS THAT ARE TO BE PRESERVED SHALL BE VISIBLY
MARKED AND THE CITY-APPROVED TREE PROTECTION FENCING OR OTHER METHOD SHALL BE INSTALLED AND MAINTAINED AT THE CRITICAL ROOT ZONES OF
THE TREES TO BE PROTECTED. THE LOCATION OF THE FENCING SHALL BE IN CONFORMANCE WITH THE APPROVED TREE PRESERVATION PLAN. THIS FENCING
SHALL BE INSPECTED BY CITY STAFF BEFORE SITE WORK BEGINS.
4. DURING CONSTRUCTION. THE FOLLOWING ACTIVITIES SHALL BE PROHIBITED WITHIN THE CRITICAL ROOT ZONE AREAS OF TREES TO BE PROTECTED.
4.A. TRENCHING;
4.B. TEMPORARY STORAGE OF ANY CONSTRUCTION MATERIALS OR CHEMICALS; AND
4.C. THE ROUTING OR PARKING OF HEAVY EQUIPMENT, INCLUDING CARS, TRUCKS, BULLDOZERS AND CONSTRUCTION TRAILERS.
4.D. SEDIMENT AND EROSION CONTROL. ALL SEDIMENT AND EROSION-CONTROL SILT FENCING OR STRAW BALES SHALL BE PLACED AT THE LIMITS OF GRADING
OR WHERE NEEDED TO MINIMIZE THE DEPOSITION OF SEDIMENT WITHIN THE DRIP LINE OF THE PROTECTED TREE(S).
4.E. ATTACHING PROTECTIVE DEVICES, SIGNS, ETC., TO TREES IS PROHIBITED. NO PROTECTIVE DEVICES, SIGNS, UTILITY POLES OR LINES, OR OTHER OBJECTS SHALL
BE NAILED OR ATTACHED TO ANY TREES THAT ARE TO BE PRESERVED.
4.F. OTHER ACTIONS PROHIBITED. ANY OTHER ACTION WITHIN THE DRIP LINE OF THE PROTECTED TREE(S) THAT MAY RESULT IN THE SEVERING OF ROOTS OR
COMPACTION OF SOIL, OR THAT MAY IMPEDE THE FREE ACCESS OF AIR AND WATER TO TREE ROOTS, SHALL BE PROHIBITED.
4.G. PONDING. WATER RETENTION PONDING MAY NOT BE LOCATED WHERE THERE ARE SIGNIFICANT TREES, UNLESS APPROVED BY THE CITY.
4.H. THE WATER RETENTION PONDING MUST BE CREATED IN A MANNER THAT PREVENTS EROSION INTO ANY NEARBY WATER RESOURCE.
4.I. AMENDMENTS TO PLAN. AN AMENDMENT TO THE TREE PRESERVATION PLAN SHALL BE REQUIRED PRIOR TO THE REMOVAL OF TREES THAT WERE DESIGNATED
FOR PRESERVATION ON THE ORIGINAL TREE PRESERVATION PLAN. THE AMENDMENT SHALL BE SUBJECT TO CITY APPROVAL PRIOR TO IMPLEMENTATION.
TREE REMOVAL GENERAL NOTES
1. THE REMOVAL, PRUNING, AND/OR PLANTING OF TREES ON PUBLIC PROPERTY REQUIRES AN APPROVED FORESTRY TREE WORK PERMIT FROM THE CITY FORESTER
ANY WORK MUST BE COMPLETED BY A LICENSED TREE CONTRACTOR.
2. PUBLIC PROPERTY TREES SHALL BE PROTECTED BY ESTABLISHING A TREE PROTECTION ZONE USING 4' TALL FENCING INSTALLED AT THE DRIP LINE OF THE TREE.
TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO THE START OF ANY SITE WORK AND MAINTAINED FOR THE DURATION OF THE PROJECT. PROPOSED
WORK WITHIN, OR CHANGES TO THE LOCATION OF TREE PROTECTION FENCING SHALL BE REVIEWED BY THE CITY FORESTER PRIOR TO ALTERATION.
3. IN LOCATIONS WHERE PUBLIC TREES CANNOT BE PROTECTED TO THE DRIP LINE WITH TEMPORARY TREE PROTECTION FENCING, THE USE OF A 6" LAYER OF
MULCH OR TRACK PADS WILL BE REQUIRED TO LIMIT SOIL COMPACTION AND PROTECT ROOT SYSTEMS WITHIN THE BOULEVARD WHEN ACCESS ROUTES OR
MATERIAL STORAGE IS NECESSARY.
4. SEE CIVIL DEMOLITION PLANS FOR ADDITIONAL SITE REMOVALS IN ADDITION TO TREES INCLUDING, BUT NOT LIMITED TO PAVING, UTILITIES, AND STRUCTURES.
5. REFER TO THE FOLLOWING PLANS FOR TREES SLATED TO BE REMOVED TO ALLOW FOR FUTURE DEVELOPMENT. A FULL TREE INVENTORY OF TREES TO BE
PRESERVED OR REMOVED IS ATTACHED TO THIS DRAWING SET FOR REFERENCE.
6. CLEAR AND GRUB AND REMOVE ALL TREES NOTED FOR REMOVAL, VEGETATION AND SITE DEBRIS WITHIN CONSTRUCTION LIMITS PRIOR TO GRADING. STRIP TOP
SOIL AND STOCKPILE ON-SITE. ALL REMOVED MATERIAL SHALL BE HAULED FROM THE SITE DAILY. ALL CLEARING AND GRUBBING AND REMOVALS SHALL BE
PERFORMED PER THE CONTRACT SPECIFICATIONS. EROSION CONTROL MEASURES SHALL BE IMMEDIATELY ESTABLISHED UPON REMOVAL. SEE THE STORMWATER
POLLUTION PREVENTION PLAN (SWPPP) / GRADING & EROSION CONTROL PLAN.
7. CONTRACTOR SHALL PROTECT SURFACE AND SUBSURFACE FEATURES NOT NOTED FOR REMOVAL. CONTRACTOR TO NOTIFY ENGINEER WITH ANY CONFLICTS OR
PLAN DISCREPANCIES.
8. CONTRACTOR TO SCHEDULE PRE-CONSTRUCTION MEETING(S) WITH UTILITY OWNER(S) TO DISCUSS DISCONNECTIONS AND/OR RELOCATIONS.
9. CONTRACTOR TO VERIFY LOCATION OF SEPTIC FIELD(S) & WELL(S) ON SITE. COORDINATE REMOVALS AND/OR ABANDONMENT WITH THE APPLICABLE
GOVERNING AGENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING APPLICABLE PERMITS. WELLS ON THE PROPERTY SHALL BE SEALED BY A
MINNESOTA DEPARTMENT OF HEALTH (MDH) LICENSED CONTRACTOR.
10. ANY DAMAGE TO ITEMS NOT NOTED TO BE REMOVED SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE REPAIRED OR REPLACED TO ORIGINAL
CONDITION WITH NO ADDITIONAL COMPENSATION.
11. CONTRACTOR SHALL COORDINATE ALL WORK WITHIN THE PUBLIC RIGHT OF WAY WITH THE APPLICABLE GOVERNING AGENCIES. ALL WORK SHALL BE
PERFORMED PER THE REQUIREMENTS OF THE APPLICABLE GOVERNING AGENCIES.
12. CONTRACTOR TO COORDINATE ALL WORK WITHIN THE ADJACENT PROPERTIES WITH THE OWNER AND ADJACENT PROPERTY OWNER.
13. CONTRACTOR TO COORDINATE DEMOLITION PHASING WITH ALL DISCIPLINES INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, ELECTRICAL,
MECHANICAL, & OWNER.
14. REFER TO THE GEOTECHNICAL REPORT FOR INFORMATION INCLUDING BUT NOT LIMITED TO GROUNDWATER CONDITIONS AND RECOMMENDATIONS FOR
EXCAVATION DEWATERING.
4'
-
0
"
EXISTING GRADE
TREE PROTECTION NOTE:
INSTALL SNOW FENCE AROUND EACH TREE TO BE PROTECTED PRIOR TO GRADING. FENCE SHALL
BE PLACED AT THE DRIP EDGE OR CRITICAL ROOT ZONES OF THE TREES. FENCING SHALL BE NO
CLOSER THAN 6' TO THE TRUNK OF ANY TREE TO BE PROTECTED. THE PERIMETERS FOR TREES
BEING PROTECTED SHALL BE DESIGNATED AT ALL TIMES DURING CONSTRUCTION ACTIVITY AND
SIGNAGE SHALL BE INSTALLED AT ALL TREE PROTECTION AREAS THAT INSTRUCTS WORKERS TO
STAY OUT. CONTRACTOR SHALL AVOID ALL AREAS WITHIN TREE PROTECTION FENCE. SOIL
SHOULD BE PROTECTED FROM EROSION AND CHANGES IN CHEMISTRY FROM CONCRETE OR
TOXIC MATERIALS SUCH AS FUELS AND PAINTS.
THE CONTRACTOR SHALL HAVE "TREE PAINT" ON SITE AT ALL TIMES. IF AN OAK IS WOUNDED
DURING CONSTRUCTION, THE CONTRACTOR MUST IMMEDIATELY APPLY PAINT TO THE WOUND IN
ORDER TO PREVENT OAK WILT. ALL DAMAGE TO TREES TO BE PROTECTED SHALL BE BROUGHT TO
THE ATTENTION OF THE OWNER AND LANDSCAPE ARCHITECT.
DR
I
P
E
D
G
E
O
F
T
R
E
E
2" X 4" WOOD STAKE,
POSITIONED AS NOTED.
STRING 4' HIGH,
ORANGE POLYETHYLENE
LAMINAR SAFETY
NETTING BETWEEN
WOOD STAKES PLACED
5' ON CENTER AND
PLACED BETWEEN TREE
PROTECTION AND
DISTURBED AREAS.
DR
I
P
E
D
G
E
O
F
T
R
E
E
EXISTING TREE
TO REMAIN
TREE PROTECTION
1/4" = 1'-0"PROJ-260128-081
.ZLOORZ VSS6:16 )DLU
8 ZLOORZ VSS6:21 )DLU
ER[HOGHU 6:10 PRRU
ER[HOGHU 6:1)DLU
101 ER[HOGHU 6:8 PRRU
102 ER[HOGHU 6:PRRU
10ER[HOGHU 6:11 )DLU
18 ER[HOGHU 6:14 )DLU
8HOP $PHULFDQ +:12 )DLU
1 PXOEHUU\ ZKLWH +:26 )DLU
4 ER[HOGHU 6:12 )DLU
ER[HOGHU 6:)DLU
6 ER[HOGHU 6:10 )DLU
100 HOP $PHULFDQ +:1)DLU
106 ER[HOGHU 6:11 )DLU
11VSUXFH ZKLWH CO 140 )DLU
114 VSUXFH ZKLWH CO 140 )DLU
11VSUXFH ZKLWH CO 14 )DLU
118 VSUXFH ZKLWH CO 12 )DLU
11VSUXFH ZKLWH CO 1)DLU
120 VSUXFH ZKLWH CO 10 )DLU
121 VSUXFH ZKLWH CO 14 40 )DLU
122 VSUXFH ZKLWH CO 14 )DLU
12VSUXFH ZKLWH CO 1)DLU
126 VSUXFH ZKLWH CO 1)DLU
12VSUXFH ZKLWH CO 12 )DLU
10 VSUXFH ZKLWH CO 14 40 )DLU
12 VSUXFH ZKLWH CO 0 )DLU
14 VSUXFH ZKLWH CO 12 )DLU
1VSUXFH ZKLWH CO 1)DLU
16 VSUXFH EOXH CO 1)DLU
1VSUXFH EOXH CO 140 )DLU
NOTE:
1. EXISTING TREES BEYOND THE PROPERTY BOUNDARY ARE DEPICTED FOR CONTEXT ONLY. TREE PRESERVATION TOTALS ARE BASED SOLELY ON
TREES LOCATED WITHIN THE LIMITS OF THE SUBJECT PROPERTY.
2. ALL PROPOSED TREES TO COUNT TOWARDS TREE MITIGATION REQUIREMENTS. REFER TO SHEET L2-1.
1 PDSOH NRUZD\+:11 *RRG
2 VSUXFH ZKLWH CO 20 )DLU
PDSOH )UHHPDQ +:16 )DLU
4 VSUXFH ZKLWH CO 2*RRG
VSUXFH ZKLWH CO 2*RRG
6 VSUXFH ZKLWH CO 10 0 *RRG
VSUXFH ZKLWH CO 20 *RRG
10 VSUXFH ZKLWH CO 2*RRG
11 SLQH $XVWULDQ CO 10 20 )DLU
12 SLQH $XVWULDQ CO 12)DLU
1FUDEDSSOH IORZHULQJ +:10 *RRG
14 RDN VZDPS ZKLWH +:*RRG
1VSUXFH ZKLWH CO 4 1)DLU
16 OLQGHQ $PHULFDQ +:2)DLU
1VSUXFH ZKLWH CO 1)DLU
18 FUDEDSSOH IORZHULQJ +:10 *RRG
1PDSOH VXJDU +:8 *RRG
20 VSUXFH ZKLWH CO 2*RRG
21 SLQH UHG CO 6 1*RRG
22 SLQH $XVWULDQ CO 10 2*RRG
2SLQH $XVWULDQ CO 12 2*RRG
24 PDSOH NRUZD\+:8 PRRU
2OLQGHQ $PHULFDQ +:22 )DLU
26 VSUXFH ZKLWH CO 44 1*RRG
2VSUXFH ZKLWH CO 1)DLU
28 OLQGHQ $PHULFDQ +:2)DLU
2VSUXFH ZKLWH CO 8 2*RRG
0 VSUXFH ZKLWH CO 8 2*RRG
1 VSUXFH ZKLWH CO 2*RRG
2 VSUXFH ZKLWH CO 20 )DLU
VSUXFH ZKLWH CO 10 0 *RRG
4 VSUXFH ZKLWH CO 8 2*RRG
VSUXFH ZKLWH CO 16 4)DLU
6 VSUXFH ZKLWH CO 12 40 PRRU
VSUXFH ZKLWH CO 140 )DLU
8 PDSOH VXJDU +:1PRRU
PDSOH VXJDU +:2)DLU
40 PDSOH NRUZD\+:24 )DLU
41 KRQH\ORFXVW +:1)DLU
42 KRQH\ORFXVW +:12 *RRG
4KRQH\ORFXVW +:10 )DLU
44 KRQH\ORFXVW +:*RRG
4KRQH\ORFXVW +:11 *RRG
46 KRQH\ORFXVW +:1*RRG
4VSUXFH EOXH CO 28 0 )DLU
48 UHGFHGDU HDVWHUQ CO 10 1)DLU
4UHGFHGDU HDVWHUQ CO 1)DLU
0 UHGFHGDU HDVWHUQ CO 10 1)DLU
1 UHGFHGDU HDVWHUQ CO 16 1)DLU
2 PDSOH UHG +:1*RRG
VSUXFH ZKLWH CO 8 20 )DLU
4 VSUXFH ZKLWH CO 2*RRG
VSUXFH ZKLWH CO 2)DLU
6 VSUXFH ZKLWH CO 10 )DLU
PDSOH )UHHPDQ +:11 *RRG
8 FUDEDSSOH IORZHULQJ +:11 *RRG
FUDEDSSOH IORZHULQJ +:10 *RRG
60 FUDEDSSOH IORZHULQJ +:11 *RRG
61 VSUXFH ZKLWH CO 20 *RRG
62 VSUXFH ZKLWH CO 1PRRU
6VSUXFH ZKLWH CO 6 20 )DLU
64 RDN SLQ +:10 *RRG
6VSUXFH ZKLWH CO 20 )DLU
66 RDN SLQ +:*RRG
6PDSOH VLOYHU +:8 )DLU
68 PDSOH VXJDU +:16 PRRU
6PDSOH NRUZD\+:10 *RRG
0 PDSOH NRUZD\+:*RRG
1 VSUXFH ZKLWH CO 140 )DLU
2 DUERUYLWDH HDVWHUQ CO 10 1)DLU
DUERUYLWDH HDVWHUQ CO 18 1)DLU
4 DUERUYLWDH HDVWHUQ CO 10 1)DLU
DUERUYLWDH HDVWHUQ CO 6 1)DLU
6 DUERUYLWDH HDVWHUQ CO 1)DLU
DUERUYLWDH HDVWHUQ CO 11 1)DLU
8 DUERUYLWDH HDVWHUQ CO 12 1)DLU
ER[HOGHU 6:1)DLU
80 VSUXFH ZKLWH CO 1)DLU
81 VSUXFH ZKLWH CO 10 0 )DLU
82 PXOEHUU\ ZKLWH +:12 )DLU
8ER[HOGHU 6:2PRRU
84 HOP $PHULFDQ +:1*RRG
8HOP $PHULFDQ +:20 )DLU
86 HOP $PHULFDQ +:11 )DLU
88 ER[HOGHU 6:21 PRRU
8ER[HOGHU 6:16 )DLU
0 ER[HOGHU 6:2)DLU
2 PXOEHUU\ ZKLWH +:1PRRU
PXOEHUU\ ZKLWH +:1PRRU
8 PXOEHUU\ ZKLWH +:16 PRRU
104 VSUXFH ZKLWH CO 1PRRU
10VSUXFH ZKLWH CO 14 2PRRU
10VSUXFH ZKLWH CO 10 PRRU
108 SLQH $XVWULDQ CO 10 2)DLU
10SLQH $XVWULDQ CO 8 20 )DLU
110 SLQH $XVWULDQ CO 11 2)DLU
111 VSUXFH ZKLWH CO 1*RRG
112 VSUXFH ZKLWH CO 1)DLU
11ELUFK ULYHU +:2 )DLU
116 VSUXFH ZKLWH CO 8 0 PRRU
124 VSUXFH ZKLWH CO 0 PRRU
12VSUXFH ZKLWH CO 11 0 PRRU
12VSUXFH ZKLWH CO 11 0 PRRU
128 ER[HOGHU 6:1PRRU
11 PXOEHUU\ ZKLWH +:11 PRRU
1ER[HOGHU 6:18 )DLU
1VSUXFH ZKLWH CO 1)DLU
140 VSUXFH ZKLWH CO 1)DLU
141 SLQH $XVWULDQ CO 8 20 *RRG
142 SLQH $XVWULDQ CO 20 *RRG
14ELUFK ULYHU +:2*RRG
144 SLQH $XVWULDQ CO 8 20 )DLU
14SLQH $XVWULDQ CO 10 20 )DLU
NO
PARKING
NO
PA
R
K
I
N
G
NO
PA
R
K
I
N
G
9
4
5
9
4
3
9
4
4
9
4
6
940
937938939941942943
9
4
5
9
4
1
9
4
2
9
4
3
9
4
4
9
4
0
9
3
9
94
1
936
936
937
938
935
940
936937938939
941
935
932
933
934
936
937
938
934
936
937
938
93
6
93
6
937
938
947
94
6
946
9
4
6
946
93
5
9
3
3
93
3
93
493
6
93
7
93
4
935
940
934
936
937
938
939
934
930
931
932
933
9
3
0
9
3
5
9
3
1
9
3
2
9
3
3
9
3
4
9
3
6
9
3
7
9
3
4
93
0
93
5
92
9
93
1
93
2
93
3
93
4
936
937
93
4
941
93
6
94
2
9
4
3
9
4
4
9
4
0
9
3
9
94
1
009
006
005
004
003
002
001
010
011
013
012
014
015
016
018
017
019
020
021
022
023
024
025
026
027
028
031
030
029
133
132
131
134135
136
137
128
130
129
127
126
125
124
123
122
121
120
119
118
117
116
114
113
112
096
098
095
094
093
092
091090
089
088
100
108
109
110
111
107
106
105
104
087
085
086
084
083
071
070
069
068
066
065
062
063
061
060
059
058
064
057
067
082
081
079
080
072
073
074
075
076
077
078
052
053
054
055
056
039038
040
034
037
036
033
035
032
041
042
043
044
045
046
047
048
049
050
051
115145144
143
142
141140
139
APPROX. LIMITS
OF GRADING
APPROX. LIMITS
OF GRADING
PROPERTY LINE-TYP.
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
L
A
N
D
S
C
A
P
E
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
L
0
-
1
T
R
E
E
P
R
E
S
E
R
V
A
T
I
O
N
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
1
2
:
1
3
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Kevin V. Kroen - LA
53757
260128.00
SRT
LJR/KVK
KVK
05/26/2026
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
N
SCALE IN FEET
0 20 40
TREE
PRESERVATION
PLAN
L0-2
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
EXISTING SIGNIFICANT TREES
(SEE L0-1 FOR DEFINITIONS)
TREE SYMBOL LEGEND AND NOTES:
EXISTING SIGNIFICANT TREE REMOVED
(SEE L0-1 FOR DEFINITIONS)
NOTE:
EXISTING TREES BEYOND THE PROPERTY BOUNDARY ARE DEPICTED FOR
CONTEXT ONLY. TREE PRESERVATION TOTALS ARE BASED SOLELY ON TREES
LOCATED WITHIN THE LIMITS OF THE SUBJECT PROPERTY.
TREE PROTECTION FENCE
SYMBOL CODE QTY BOTANICAL NAME COMMON NAME CONT SIZE
DECIDUOUS TREES
AC-F 12 ACER FREEMANII `ARMSTRONG`ARMSTRONG MAPLE B&B 2.5" CAL
AC-S 6 ACER FREEMANII `SIENNA GLEN`SIENNA GLEN MAPLE B&B 3.5" CAL
GY-E 15 GYMNOCLADUS DIOICUS 'ESPRESSO-JFS'ESPRESSO™ KENTUCKY COFFEETREE B&B 3.5" CAL
MA-A 12 MALUS X 'ADIRONDACK'ADIRONDACK CRABAPPLE B&B 2.5" CAL
MA-S 19 MALUS X `SPRING SNOW`SPRING SNOW CRABAPPLE B&B 2.5" CAL
QU-B 9 QUERCUS BICOLOR SWAMP WHITE OAK B&B 4.5" CAL
QU-I 9 QUERCUS BICOLOR SWAMP WHITE OAK B&B 3.5" CAL
QU-K 24 QUERCUS ROBUR X BICOLOR 'NADLER'KINDRED SPIRIT® OAK B&B 2.5" CAL
QU-P 9 QUERCUS ROBUR X BICOLOR 'LONG'REGAL PRINCE® OAK B&B 3.5" CAL
115 SUBTOTAL:
EVERGREEN TREES
JU-V 10 JUNIPERUS VIRGINIANA EASTERN RED CEDAR B&B 6' HGT
PI-A 12 PINUS CEMBRA 'ALGONQUIN PILLAR'ALGONQUIN PILLAR SWISS STONE PINE B&B 10' HGT
PI-D 10 PICEA GLAUCA `DENSATA`BLACK HILLS SPRUCE B&B 6' HGT
PI-G 9 PICEA GLAUCA `DENSATA`BLACK HILLS SPRUCE B&B 12' HGT
41 SUBTOTAL:
PLANT SCHEDULE
SYMBOL CODE BOTANICAL NAME COMMON NAME
GROUND COVERS
RM-01 ROCK MULCH-TYPE 1 2 1/2" GRAY TRAP ROCK
RM-02 ROCK MULCH-TYPE 2 3/4" GRAY TRAP ROCK
RM-03 ROCK MULCH-TYPE 3 DECORATIVE RIP RAP
RM-04 ROCK MULCH-TYPE 4 3/8" PEA GRAVEL
SM-01 STORMWATER SOUTH AND WEST - BWSR 33-261 FILTRATION BASIN MIX
TS-01 TURF SOD BLUEGRASS BLEND SOD
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
L
A
N
D
S
C
A
P
E
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
L
1
-
1
L
A
N
D
S
C
A
P
E
P
L
A
N
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
1
2
:
1
3
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Kevin V. Kroen - LA
53757
260128.00
SRT
LJR/KVK
KVK
05/26/2026
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
LANDSCAPE
NOTES &
SCHEDULE
L1-1
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
GENERAL NOTES:
CONTRACTOR SHALL VISIT SITE PRIOR TO SUBMITTING BID. INSPECT SITE AND
BECOME FAMILIAR WITH EXISTING CONDITIONS RELATING TO THE NATURE AND
SCOPE OF WORK.
VERIFY LAYOUT AND ANY DIMENSIONS SHOWN AND BRING TO THE ATTENTION
OF THE LANDSCAPE ARCHITECT ANY DISCREPANCIES WHICH MAY COMPROMISE
THE DESIGN AND / OR INTENT OF THE PROJECT'S LAYOUT.
ASSURE COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS
GOVERNING THE WORK OR MATERIALS SUPPLIED.
CONTRACTOR SHALL PROTECT ALL EXISTING ROADS, CURBS / GUTTERS, TRAILS,
TREES, LAWNS AND SITE ELEMENTS DURING PLANTING OPERATIONS. ANY
DAMAGE TO SAME SHALL BE REPAIRED AT NO COST TO THE OWNER.
CONTRACTOR SHALL VERIFY ALIGNMENT AND LOCATION OF ALL
UNDERGROUND AND ABOVE GRADE UTILITIES. CONTRACTOR TO PROVIDE THE
NECESSARY PROTECTION FOR THE UTILITIES BEFORE CONSTRUCTION / MATERIAL
INSTALLATION BEGINS. CONTRACTOR TO NOTIFY GENERAL CONTRACTOR OF
ANY CONCERNS PRIOR TO INSTALLATION OF PLANTINGS.
EXISTING CONTOURS, TRAILS, VEGETATION, CURB / GUTTER AND OTHER
EXISTING ELEMENTS BASED UPON INFORMATION SUPPLIED TO LANDSCAPE
ARCHITECT BY OTHERS. CONTRACTOR SHALL VERIFY ANY AND ALL
DISCREPANCIES PRIOR TO CONSTRUCTION AND NOTIFY LANDSCAPE ARCHITECT
OF SAME.
THE ALIGNMENT AND GRADES OF THE PROPOSED WALKS, TRAILS AND / OR
ROADWAYS ARE SUBJECT TO FIELD ADJUSTMENT REQUIRED TO CONFORM TO
LOCALIZED TOPOGRAPHIC CONDITIONS AND TO MINIMIZE TREE REMOVAL AND
GRADING. ANY CHANGE IN ALIGNMENT MUST BE APPROVED BY LANDSCAPE
ARCHITECT.
IRRIGATION NOTES:
VERIFY EXISTING / PROPOSED IRRIGATION SYSTEM LAYOUT AND CONFIRM
COMPLETE LIMITS OF IRRIGATION PRIOR TO SUPPLYING SHOP DRAWINGS.
LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AN
IRRIGATION LAYOUT PLAN AND SPECIFICATION AS A PART OF THE SCOPE OF
WORK WHEN BIDDING. THESE SHALL BE APPROVED BY THE LANDSCAPE
ARCHITECT PRIOR TO ORDER AND / OR INSTALLATION. IT SHALL BE THE
LANDSCAPE CONTRACTORS RESPONSIBILITY TO INSURE THAT ALL SODDED /
SEEDED AND PLANTED AREAS ARE IRRIGATED PROPERLY, INCLUDING THOSE
AREAS DIRECTLY AROUND AND ABUTTING BUILDING FOUNDATION.
THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH AN
IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND
TO PLANT MATERIAL GROWTH REQUIREMENTS.
IRRIGATION SYSTEM IS NOT TO SPRINKLE ACROSS PAVEMENT NOR SHALL THE
SYSTEM SPRINKLE THE BUILDING.
THE SYSTEM SHALL INCORPORATE A RAIN SENSOR INTO IRRIGATION SYSTEM.
PLANTINGS OUTSIDE THE LIMITS OF IRRIGATION ARE TO BE WATERED
REGULARLY UNTIL PLANTING / SOD / SEED HAS BEEN ESTABLISHED.
GENERAL NOTES
COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING
INSTALLATION WITH OTHER CONTRACTORS WORKING ON SITE.
NO PLANTING WILL BE INSTALLED UNTIL ALL GRADING AND
CONSTRUCTION HAS BEEN COMPLETED IN THE IMMEDIATE AREA.
ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS. REMOVE ALL
FLAGGING AND LABELS FROM PLANTS.
IF THE LANDSCAPE CONTRACTOR IS CONCERNED OR PERCEIVES ANY
DEFICIENCIES IN THE PLANT SELECTIONS, SOIL CONDITIONS OR ANY OTHER
SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT PLANT
ESTABLISHMENT, SURVIVAL OR GUARANTEE, THE CONTRACTOR MUST BRING
THESE DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT
PRIOR TO PROCUREMENT AND / OR INSTALLATION.
PROTECT ALL EXISTING TREES ON SITE SCHEDULED TO REMAIN. IF EXISTING
TREES ARE DAMAGED IN ANY MANNER, ABOVE OR BELOW GROUND IN THE
ROOT SYSTEM, AN ASPHALTIC TREE PRUNING PAINT SHOULD BE APPLIED
IMMEDIATELY AFTER WOUNDING.
SOIL & GROUNDCOVER
ALL PLANTING AREAS RECEIVING PLANTED GROUND COVER, PERENNIALS,
ANNUALS, AND/OR VINES SHALL RECEIVE A MINIMUM OF 24" DEPTH OF
PLANTING SOIL (MNDOT 3877 - 2B OR EQUAL).
WHERE SOD / SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD / SEED
SHALL BE HELD 1" BELOW SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC.
SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS
NOTED TO RECEIVE SOD. SEED SHALL BE INSTALLED AND MULCHED AS PER
MNDOT SPECS.
SOD ALL DESIGNATED AREAS DISTURBED DUE TO GRADING. SOD SHALL BE
LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS.
ON SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, THE SOD SHALL BE
STAKED TO THE GROUND.
LANDSCAPE CONTRACTOR SHALL VERIFY THAT SOIL AND COMPACTION
CONDITIONS ARE ADEQUATE TO ALLOW FOR PROPER DRAINAGE AT AND
AROUND THE BUILDING SITE.
PLANTINGS INFO
ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE
AMERICAN STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF
NURSERYMEN. UNLESS NOTED OTHERWISE, ALL SHRUBS SHALL HAVE AT
LEAST 5 CANES AT THE SPECIFIED MINIMUM SHRUB HEIGHT OR WIDTH.
ORNAMENTAL TREES SHALL HAVE NO V CROTCHES AND SHALL BEGIN
BRANCHING NO LOWER THAN 3' ABOVE ROOT BALL. STREET AND
BOULEVARD TREES SHALL BEGIN BRANCHING NO LOWER THAN 5' ABOVE
FINISHED GRADE.
ANY CONIFEROUS TREE PREVIOUSLY PRUNED FOR CHRISTMAS TREE SALES
SHALL NOT BE USED. ALL CONIFEROUS TREES SHALL BE FULL FORM,
NATURAL TO THE SPECIES, WITHOUT PRUNING.
PRIOR TO PLANTING, FIELD VERIFY THAT THE ROOT COLLAR / ROOT FLAIR IS
LOCATED AT THE TOP OF THE BALLED & BURLAP TREE. IF THIS IS NOT THE
CASE, SOIL SHALL BE REMOVED DOWN TO THE ROOT COLLAR / ROOT FLAIR.
WHEN THE BALLED & BURLAP TREE IS PLANTED, THE ROOT COLLAR / ROOT
FLAIR SHALL BE EVEN OR SLIGHTLY ABOVE FINISHED GRADE.
ALL PROPOSED PLANTS SHALL BE LOCATED AND STAKED AS SHOWN ON
PLAN. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY BE
NEEDED IN FIELD. SHOULD AN ADJUSTMENT BE ADVISED, THE LANDSCAPE
ARCHITECT MUST BE NOTIFIED.
PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN
QUANTITIES EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES.
NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL
IS REQUESTED OF THE LANDSCAPE ARCHITECT BY THE LANDSCAPE
CONTRACTOR PRIOR TO THE SUBMISSION OF A BID AND / OR QUOTATION.
WRAPPING MATERIAL SHALL BE CORRUGATED PVC PIPING 1" GREATER IN
CALIPER THAN THE TREE BEING PROTECTED OR QUALITY, HEAVY,
WATERPROOF CREPE PAPER MANUFACTURED FOR THIS PURPOSE. WRAP ALL
DECIDUOUS TREES PLANTED IN THE FALL PRIOR TO 12-1 AND REMOVE ALL
WRAPPING AFTER 5-1.
FERTILIZER
ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH A
27-3-3 SLOW RELEASE FERTILIZER MIXED IN WITH THE PLANTING SOIL PER
THE MANUFACTURER'S INSTRUCTIONS. PLANTS MAY BE TREATED FOR
SUMMER AND FALL INSTALLATION WITH AN APPLICATION OF GRANULAR
27-3-3 AT 6 OZ PER 2.5" CALIPER PER TREE AND 3 OZ PER SHRUB WITH AN
ADDITIONAL APPLICATION OF 27-3-3 THE FOLLOWING SPRING IN THE TREE
SAUCER.
EDGING FOR PLANTING BEDS
BLACK METAL EDGER TO BE USED TO CONTAIN SHRUBS, PERENNIALS, AND
ANNUALS WHERE BED MEETS SOD / SEED UNLESS NOTED OTHERWISE.
PLANTING BED PREPARATION
ALL ANNUAL AND PERENNIAL PLANTING BEDS TO RECEIVE 3" DEEP
SHREDDED HARDWOOD WITH NO WEED BARRIER AND ROCK MULCH WITH
WEED BARRIER.
ALL SHRUB BED MASSINGS TO RECEIVE 3" DEEP SHREDDED HARDWOOD
WITH NO WEED BARRIER AND ROCK MULCH WITH WEED BARRIER.
ALL TREES NOT IN PLANTING BEDS TO RECEIVE 4" DEEP SHREDDED
HARDWOOD MULCH RING WITH NO MULCH IN DIRECT CONTACT WITH
TREE TRUNK.
SPREAD GRANULAR PRE EMERGENT HERBICIDE (PREEN OR EQUAL) PER
MANUFACTURER'S RECOMMENDATIONS UNDER ALL MULCHED AREAS.
MAINTENANCE STRIPS TO HAVE EDGER AND MULCH AS SPECIFIED /
INDICATED ON DRAWING OR IN SPECIFICATION.
INSPECTION AND WARRANTY
CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST FOR THE OWNER
ACCEPTANCE INSPECTION OF ALL LANDSCAPE AND SITE IMPROVEMENTS.
CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL
NEWLY INSTALLED MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY
ACTS OF VANDALISM OR DAMAGE WHICH MAY OCCUR PRIOR TO OWNER
ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
CONTRACTOR SHALL PROVIDE THE OWNER WITH A MAINTENANCE
PROGRAM INCLUDING, BUT NOT NECESSARILY LIMITED TO, PRUNING,
FERTILIZATION AND DISEASE / PEST CONTROL.
CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH TWO (2)
CALENDAR YEAR FROM THE DATE OF OWNER ACCEPTANCE.
WARRANTY (TWO (2) FULL GROWING SEASON) FOR LANDSCAPE MATERIALS
SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE LANDSCAPE ARCHITECT
AFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE MATERIALS. NO
PARTIAL ACCEPTANCE WILL BE CONSIDERED.
TIMING OF INSTALLATION
UNLESS NOTED OTHERWISE THE APPROPRIATE DATES FOR SPRING PLANT
MATERIAL INSTALLATION AND SEED / SOD PLACEMENT IS FROM THE TIME
GROUND HAS THAWED TO JUNE 15.
FALL SODDING IS GENERALLY ACCEPTABLE FROM AUGUST 15 - NOVEMBER 1.
FALL SEEDING FROM AUGUST 15 - SEPTEMBER 15; DORMANT SEEDING IN
THE FALL SHALL NOT OCCUR PRIOR TO NOVEMBER 1. FALL CONIFEROUS
PLANTING MAY OCCUR FROM AUGUST 15 - OCTOBER 1 AND DECIDUOUS
PLANTING FROM THE FIRST FROST UNTIL NOVEMBER 15. PLANTING OUTSIDE
THESE DATES IS NOT RECOMMENDED. ANY ADJUSTMENT MUST BE
APPROVED IN WRITING BY THE LANDSCAPE ARCHITECT.
TREES ARE NOT TO BE PRUNED, REMOVED OR TRANSPLANTED BETWEEN
APRIL 15 AND JULY 1. NOTIFY LANDSCAPE ARCHITECT IF THESE DATES ARE
UNAVOIDABLE.
LANDSCAPE INSTALLATION:
CITY OF ARDEN HILLS LANDSCAPE REQUIREMENTS:
TREE MITIGATION REQUIREMENTS:
MITIGATION RATE. SIGNIFICANT LIVE TREES LOST OR REASONABLY ANTICIPATED TO BE LOST AS A RESULT OF BUILDING,
CONSTRUCTION, OR GRADING IMMEDIATELY OR IN THE FUTURE, SHALL BE REPLACED BY THE PROPERTY OWNER BY PLANTING
THAT NUMBER OF CALIPER INCHES OF TREES ("REPLACEMENT TREES") DETERMINED AT A RATE OF 1:2 OR ONE INCH REPLACED
FOR EVERY TWO INCHES LOST. THE TREES REQUIRED TO BE REPLACED PURSUANT TO THIS SECTION SHALL BE IN ADDITION TO
ANY OTHER TREES REQUIRED TO BE PLANTED PURSUANT TO ANY OTHER PROVISION OF THE CODE.
ON SITE SIGNIFICANT TREES (IN CALIPER INCHES):1,403 CALIPER IN.
ON SITE SIGNIFICANT TREES LOST (IN CALIPER INCHES):1,113 CALIPER IN.
ON SITE SIGNIFICANT TREES KEPT (IN CALIPER INCHES):290 CALIPER IN.
AMOUNT OF MITIGATION REQUIRED (IN CALIPER INCHES):486.35 CALIPER IN.
AMOUNT OF MITIGATION PROPOSED (IN CALIPER INCHES):487.5 CALIPER IN.
LANDSCAPE REQUIREMENTS:
CALIPER INCHES. THE MINIMUM CALIPER INCHES REQUIRED PER BUILDING SITE SHALL RELATE TO THE GROSS SQUARE
FOOTAGE OF ALL FLOORS OF A BUILDING AND THE BUILDING HEIGHT. A SINGLE STORY BUILDING IN EXCESS OF THIRTY (30)
FEET IN HEIGHT SHALL BE CONSIDERED A TWO-STORY BUILDING FOR THE PURPOSES OF DETERMINING GROSS SQUARE
FOOTAGE. MINIMUM TOTAL CALIPER INCHES = GROSS SQUARE FOOTAGE OF ALL FLOORS OF BUILDING / 320.
BUILDING HEIGHT IN STORIES:PERCENTAGE OF TREES OF VARIOUS CALIPER INCHES:
2.0" - 3.0" 3.5" - 4.0" 4.5" - 6.0"
1-2 50 % 30 % 20 %
3-4 50 % 30 % 20 %
5 AND OVER 30 % 50 % 20 %
GROSS SQUARE FOOTAGE OF ALL FLOORS:198,094 SF
CALIPER INCHES REQUIRED (619 - 290 CALIPER IN. KEPT):329.0 CALIPER IN.
2.0" - 3.0" TREES PROVIDED:217.5 CALIPER IN.
3.5" - 4.0" TREES PROVIDED:184.5 CALIPER IN.
4.5" - 6.0" TREES PROVIDED:85.5 CALIPER IN.
TREES ALONG STREET FRONTAGE. A MINIMUM OF ONE TREE SHALL BE PROVIDED ALONG THE RIGHT OF WAY FOR EVERY FIFTY
(50) FEET OF PUBLIC STREET FRONTAGE. 586.6' ALONG HARRIET AVE AND 445.7' ALONG LEXINGTON AVE N.
TOTAL STREET FRONTAGE:1,032.3'
TOTAL STREET TREES REQUIRED:21 TREES
TOTAL STREET TREES PROVIDED:30 TREES
PERENNIALS AND SHRUBBERIES. AT LEAST TEN (10) PERCENT OF THE TOTAL LANDSCAPED AREA SHALL BE COVERED WITH
PERENNIALS AND/OR SHRUBBERY AND BE PLANTED WITHIN THE PERIMETER OF PRIVATE PARKING, BUILDING, AND DRIVEWAY
AREAS.
TOTAL LANDSCAPED AREA:87,324.60 SF
TOTAL PLANTING AREA REQUIRED:8,732.46 SF / 10%
TOTAL PLANTING AREA PROVIDED:9,888.63 SF / 11.3%
PLANTING ISLANDS. PLANTING ISLANDS SHALL BE REQUIRED TO VISUALLY BREAK UP EXPANSES OF HARD-SURFACE PARKING
AREAS, TO PROVIDE SAFE AND EFFICIENT TRAFFIC MOVEMENT, AND TO DEFINE ROWS OF PARKING. PLANTING ISLANDS SHALL
OCCUPY AT LEAST TEN (10) PERCENT OF THE PARKING AREA. PLANTING ISLANDS SHALL BE EDGED WITH CONCRETE CURBS.
PARKING LOT PLANTING ISLANDS SHALL BE A MINIMUM OF 150 SQUARE FEET IN AREA, BE OF APPROPRIATE WIDTH AND
LENGTH, AND INCLUDE AT LEAST ONE TREE MEETING THE REQUIREMENTS OF THIS ORDINANCE.
TOTAL PARKING AREA:59,482.94 SF
PLANTING ISLAND AREA REQUIRED (59,482.94 SF / 10):5,948.30 SF / 10%
PLANTING ISLAND AREA PROVIDED:6,974.05 SF / 11.7%
PROPOSED
BUILDING
FFE=947.25
GFE=936.25
(COORDINATE W/
ARCHITECTURAL)
NO
PARKING
NO
PA
R
K
I
N
G
NO
PA
R
K
I
N
G
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
9
4
5
9
4
3
9
4
4
9
4
6
940
937938939941942943
9
4
5
9
4
1
9
4
2
9
4
3
9
4
4
9
4
0
9
3
9
94
1
936
936
937
938
935
940
936937938939
941
935
932
933
934
936
937
938
934
936
937
938
93
6
93
6
937
938
947
94
6
946
9
4
6
946
93
5
9
3
3
93
3
93
493
6
93
7
93
4
935
940
934
936
937
938
939
934
930
931
932
933
9
3
0
9
3
5
9
3
1
9
3
2
9
3
3
9
3
4
9
3
6
9
3
7
9
3
4
93
0
93
5
92
9
93
1
93
2
93
3
93
4
936
937
93
4
941
93
6
94
2
9
4
3
9
4
4
9
4
0
9
3
9
94
1
FILTRATION
BASIN 1P
NWL=DRY
HWL=934.10
FILTRATION
BASIN 2P
NWL=DRY
HWL=932.73
5
QU-B
2
QU-B 2
QU-B
1
MA-S
3
PI-D
3
PI-D
5
MA-A
7
MA-A
3
PI-A
3
PI-A
5
JU-V
4
MA-S
5
AC-F
3
PI-G
3
PI-G
3
PI-G
3
QU-I
3
QU-I
3
QU-I
3
JU-V
3
MA-S 5
MA-S
3
PI-A
1
GY-E
2
GY-E
1
GY-E
1
GY-E
1
GY-E
1
GY-E
1
GY-E
2
GY-E
6
QU-P
1
GY-E
4
AC-F
1
GY-E
3
QU-P
1
AC-F
1
AC-F
1
AC-F
3
PI-A
6
QU-K
6
QU-K
6
QU-K
6
QU-K
2
PI-D
1
JU-V
2
AC-S
1
PI-D 1
PI-D
2
MA-S
1
AC-S
1
JU-V
1
GY-E
1
GY-E
1
AC-S
1
AC-S
1
GY-E
4
MA-S
1
AC-S
AMENITY AREA
TOT LOT
SPORTS COURTS
(BY OTHERS)
DOG RUN
PATIO
RM-01
RM-02
RM-03
RM-03
RM-02
RM-02
RM-01
SM-01
SM-01
SM-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
TS-01
LIMITS OF IRRIGATION (TYP.)
LIMITS OF IRRIGATION (TYP.)
LIMITS OF IRRIGATION (TYP.)
LANDSCAPE
EDGING (TYP.)
LANDSCAPE
EDGING (TYP.)
APPROX. LIMITS
OF GRADING
APPROX. LIMITS
OF GRADING
PROPERTY LINE, TYP.
RETAINING WALL,
SEE CIVIL
CODE BOTANICAL / COMMON NAME CONT SIZE
DECIDUOUS TREES
AC-F ACER FREEMANII `ARMSTRONG`
ARMSTRONG MAPLE
B&B 2.5" CAL
AC-S ACER FREEMANII `SIENNA GLEN`
SIENNA GLEN MAPLE
B&B 3.5" CAL
GY-E GYMNOCLADUS DIOICUS 'ESPRESSO-JFS'
ESPRESSO™ KENTUCKY COFFEETREE
B&B 3.5" CAL
MA-A MALUS X 'ADIRONDACK'
ADIRONDACK CRABAPPLE
B&B 2.5" CAL
MA-S MALUS X `SPRING SNOW`
SPRING SNOW CRABAPPLE
B&B 2.5" CAL
QU-B QUERCUS BICOLOR
SWAMP WHITE OAK
B&B 4.5" CAL
QU-I QUERCUS BICOLOR
SWAMP WHITE OAK
B&B 3.5" CAL
QU-K QUERCUS ROBUR X BICOLOR 'NADLER'
KINDRED SPIRIT® OAK
B&B 2.5" CAL
QU-P QUERCUS ROBUR X BICOLOR 'LONG'
REGAL PRINCE® OAK
B&B 3.5" CAL
EVERGREEN TREES
JU-V JUNIPERUS VIRGINIANA
EASTERN RED CEDAR
B&B 6' HGT
PI-A PINUS CEMBRA 'ALGONQUIN PILLAR'
ALGONQUIN PILLAR SWISS STONE PINE
B&B 10' HGT
PI-D PICEA GLAUCA `DENSATA`
BLACK HILLS SPRUCE
B&B 6' HGT
PI-G PICEA GLAUCA `DENSATA`
BLACK HILLS SPRUCE
B&B 12' HGT
PLANT SCHEDULE
SYMBOL CODE BOTANICAL / COMMON NAME
GROUND COVERS
RM-01 ROCK MULCH-TYPE 1
2 1/2" GRAY TRAP ROCK
RM-02 ROCK MULCH-TYPE 2
3/4" GRAY TRAP ROCK
RM-03 ROCK MULCH-TYPE 3
DECORATIVE RIP RAP
RM-04 ROCK MULCH-TYPE 4
3/8" PEA GRAVEL
SM-01
STORMWATER SOUTH AND WEST - BWSR
33-261
FILTRATION BASIN MIX
TS-01 TURF SOD
BLUEGRASS BLEND SOD
GROUND COVER SCHEDULE
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
L
A
N
D
S
C
A
P
E
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
L
1
-
1
L
A
N
D
S
C
A
P
E
P
L
A
N
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
1
2
:
1
3
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Kevin V. Kroen - LA
53757
260128.00
SRT
LJR/KVK
KVK
05/26/2026
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
N
SCALE IN FEET
0 20 40
LANDSCAPE
PLAN
L2-1
TOLL FREE: 1-800-252-1166
TWIN CITY AREA: 651-454-0002
Gopher State One Call
CALL BEFORE YOU DIG!
WARNING:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING FOR LOCATIONS OF ALL
EXISTING UTILITIES. THEY SHALL COOPERATE WITH ALL UTILITY COMPANIES IN
MAINTAINING THEIR SERVICE AND / OR RELOCATION OF LINES.
THE CONTRACTOR SHALL CONTACT GOPHER STATE ONE CALL AT 651-454-0002 AT
LEAST 48 HOURS IN ADVANCE FOR THE LOCATIONS OF ALL UNDERGROUND WIRES,
CABLES, CONDUITS, PIPES, MANHOLES, VALVES OR OTHER BURIED STRUCTURES BEFORE
DIGGING. THE CONTRACTOR SHALL REPAIR OR REPLACE THE ABOVE WHEN DAMAGED
DURING CONSTRUCTION AT NO COST TO THE OWNER.
LOUCKS
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
L
A
N
D
S
C
A
P
E
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
L
8
-
1
L
A
N
D
S
C
A
P
E
D
E
T
A
I
L
S
Pl
o
t
t
e
d
:
0
5
/
2
7
/
2
0
2
6
1
2
:
1
4
P
M
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
CADD files prepared by the Consultant for this project are
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
of this project by others without written approval by the
Consultant. With the Consultant's approval, others may be
permitted to obtain copies of the CADD drawing files for
information and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD files shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
SUBMITTAL/REVISIONS
PROFESSIONAL SIGNATURE
QUALITY CONTROL
CADD QUALIFICATION
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
3499
LEXINGTON
AVE. N
APARTMENTS
3499 LEXINGTON AVENUE N,
ARDEN HILLS, MN 55126
OWNER NAME
OWNER ADDRESS
Review Date
SHEET INDEX
License No.
Date
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Landscape Architect under the laws
of the State of Minnesota.
Project Lead
Drawn By
Checked By
Loucks Project No.
Kevin V. Kroen - LA
53757
260128.00
SRT
LJR/KVK
KVK
05/26/2026
C1-1 EXISTING CONDITIONS
C1-2 DEMOLITION PLAN
C2-1 SITE PLAN
C2-2 ACCESSIBLE ROUTE PLAN
C2-3 TURNING MOVEMENTS
C3-1 GRADING PLAN
C3-2
C3-3 SWPPP NOTES
C4-1 UTILITY PLAN
C8-1 - C8-4 CIVIL DETAILS
L2-1 LANDSCAPE PLAN
L8-1 LANDSCAPE DETAILS
05/01/2026 PUD SUBMISSION
SWPPP
PRELIM
I
N
A
R
Y
NOTE:
EXISTING CONDITIONS INFORMATION
SHOWN IS FROM AN ALTA/NSPS LAND
TITLE SURVEY PREPARED BY LOUCKS,
DATED 04/11/2026.
L1-1 LANDSCAPE NOTES & SCH.
L0-2 TREE PRESERVATION PLAN
L0-1 TREE INVENTORY
C1-3 GENERAL NOTES
05/27/2026 PUD SUBMISSION
LANDSCAPE
DETAILS
L8-1
2x ROOT BALL WIDTH
SET PLANT ON UNDISTRUBED NATIVE SOIL
SCARIFY BOTTOM AND SIDES OF HOLE PRIOR
TO PLANTING
EDGE CONDITION VARIES
WOOD STAKE
BACKFILL WITH IN SITU TOPSOIL
MULCH - 4" DEEP. NO MULCH IN CONTACT WITH
TRUNK - SEE NOTES OR SPECS.
ROOT FLARE EVEN WITH OR JUST ABOVE GRADE
SAFETY FLAGGING - ONE PER WIRE
TREE WRAP TO FIRST BRANCH
16"X2" POLYPROPYLENE OR POLYETHYLENE STRAP
NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR
MAINTAINING ALL TREES IN A PLUMB
POSITION THROUGH THE WARRANTY
PERIOD. STAKING IS SUGGESTED, BUT NOT
REQUIRED. ANY STAKING MUST CONFORM
WITH PRACTICES AS DEFINED IN A.N.A.
GUIDELINES FOR STANDARD PRACTICES.
2. PRUNE DAMAGED AND CROSSING BRANCHES
AFTER PLANTING IS COMPLETE.
3. CUT BACK WIRE BASKET.
4. WATER TREE THOROUGHLY DURING
PLANTING OPERATIONS. PLACE BACKFILL IN
8-12" LIFTS AND SATURATE SOIL WITH
WATER. DO NOT COMPACT MORE THAN
NECESSARY TO MAINTAIN PLUMB.
5. CONTRACTOR IS RESPONSIBLE FOR TESTING
PERCOLATION RATES PRIOR TO PLANTING.
NOTIFY LANDSCAPE ARCHITECT
IMMEDIATELY IF POOR DRAINAGE EXISTS.
DETAIL - DECIDUOUS TREE
3/4" = 1'-0"
CUT ROPES AND EXPOSE TOP 1/3 OF BURLAP BALL.
REMOVE NON-BIODEGRADABLE MATERIAL.
LOUCKS
PROJ-260128-01
1
2 x ROOT BALL WIDTH
NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR
MAINTAINING ALL TREES IN A PLUMB
POSITION THROUGH THE WARRANTY
PERIOD. STAKING IS SUGGESTED, BUT NOT
REQUIRED. ANY STAKING MUST CONFORM
WITH PRACTICES AS DEFINED IN A.N.A.
GUIDELINES FOR STANDARD PRACTICES.
2. PRUNE ANY DAMAGED BRANCHES AFTER
PLANTING IS COMPLETE.
3. WATER TREE THOROUGHLY DURING
PLANTING OPERATIONS. PLACE BACKFILL IN
8-12" LIFTS AND SATURATE SOIL WITH
WATER. DO NOT COMPACT MORE THAN
NECESSARY TO MAINTAIN PLUMB.
4. CONTRACTOR IS RESPONSIBLE FOR TESTING
PERCOLATION RATES PRIOR TO PLANTING.
NOTIFY LANDSCAPE ARCHITECT
IMMEDIATELY IF POOR DRAINAGE EXISTS.
DETAIL - CONIFEROUS TREE
3/4" = 1'-0"
SET PLANT ON UNDISTRUBED NATIVE SOIL
SCARIFY BOTTOM AND SIDES OF HOLE PRIOR
TO PLANTING
EDGE CONDITION VARIES
WOOD STAKE
BACKFILL WITH IN SITU TOPSOIL
MULCH - 4" DEEP. NO MULCH IN CONTACT WITH
TRUNK - SEE NOTES OR SPECS.
SAFETY FLAGGING - ONE PER WIRE
16"X2" POLYPROPYLENE OR POLYETHYLENE STRAP
CUT ROPES AND EXPOSE TOP 1/3 OF BURLAP BALL.
REMOVE NON-BIODEGRADABLE MATERIAL.
LOUCKS2
PROJ-260128-02
NOTES:
LOOSEN ROOTS OF ALL CONTAINERIZED
PLANTS. SCARIFY BOTTOM AND SIDES OF
HOLE PRIOR TO PLANTING
BU
I
L
D
I
N
G
W
A
L
L
(
T
Y
P
)
EDGE VARIES - REFER TO PLAN
EDGING MATERIAL - SEE NOTES OR SPEC.
LANDSCAPE FABRIC - SEE NOTES OR SPEC.
MULCH - 3" DEPTH - SEE NOTES OR SPEC.
PLANTING SOIL - SEE NOTES OR SPEC.
SHRUBS TO BE PLACED SO THAT TOP OF
CONTAINER SITS FLUSH WITH PROPOSED GRADE
DETAIL - SHRUB PLANTING
1" = 1'-0"
REFER TO SCHEDULE
18" MIN.
PREPARE BED A MIN. 4" DEEPER THAN ROOT BALL
LOUCKS
PROJ-260128-04
3
VARIES
SEE SCHEDULE FOR SPACING
NOTE:
LOOSEN ROOTS OF PLANT
MATERIAL PRIOR TO PLANTING
BU
I
L
D
I
N
G
W
A
L
L
(
T
Y
P
)
PLANTING SOIL - SEE NOTES
EDGE VARIES - REFER TO PLAN
EDGING MATERIAL - SEE NOTES
MULCH - 3" MIN. DEPTH - SEE NOTES
PLANTING - PERENNIAL
1" = 1'-0"
LOUCKS
PROJ-260128-03
4
DERO - ROLLING RACK
3/8" = 1'-0"
NOTES:
MODEL: RR2H (38" )
COLOR: SUBMIT STANDARD POWDER COAT COLORS FOR
OWNER APPROVAL
FINISH: MATTE POWDER COAT
DERO - ROLLING RACK
BIKE RACK OR EQUAL
36
"
LOUCKS10
PROJ-260128-05
HOLD FINISHED GRADE 1/2" BELOW EDGER- SEE PLAN
FOR EDGE CONDITION
TURF- SEE PLANTING PLAN
PLANTING PLAN - SEE SCHEDULE
ED-01 - METAL EDGER WITH STAKE
ED-01 - LANDSCAPE EDGER TYP. ̀
1 1/2" = 1'-0"
LOUCKS
PROJ-260128-10
5
NOTES:
VARIES - SEE PLAN
5'
-
0
"
4'
-
0
"
3 3/4"
2"
3. CONTRACTOR TO VERIFY UTILITY LOCATIONS
AND FIELD ALTER POST LOCATIONS AS NEEDED.10"
2. COLOR TO BE BLACK 'NO MAR' POLYESTER FINISH
1. CONFIRM POST SIZES WITH MANUFACTURER'S
WIND LOADING CHARTS
1 3/4" FORERUNNER RAIL
1" X 14 GA. SQUARE PICKET
CONFIRM POST SIZE WITH MNFR.
1 3/4" FORERUNNER RAIL
EXTEND CONCRETE FOOTING TO BELOW FROST
DEPTH
FE-01 - DECORATIVE FENCE
3/8" = 1'-0"
LOUCKS6
PROJ-260128-11
ROCK MULCH AT 4" MIN. DEPTH; EXPOSE NO
FABRIC ; SEE SCHEDULE FOR COLOR
WOVEN GEOTEXTILE FABRIC. OVERLAP 6" MINIMUM;
SECURE IN PLACE WITH POLY FABRIC STAPLES
PREPARED SUBGRADE
LM-02 - ROCK MULCH
1 1/2" = 1'-0"
LOUCKS.
PROJ-260128-09
CONCRETE CURB
ADD CONTROL JOINTS EVERY 48" MIN.
TWO #4 REBAR CONTINUOUS
EXISTING GROUND OR
COMPACTED SUBGRADE
12"
4" DRAIN TILE W/ CLEAN DRAINAGE
AGGREGATE
GEO-TEXTILE FABRIC
COMPACTED CLASS V
BASE MATERIAL
ORNAMENTAL FENCE
(SURFACE MOUNT) SEE DETAIL
GRAVEL DOG RUN SURFACE
CONCRETE CURB # DOG RUN
1/2" = 1'-0"
LOUCKS
PROJ-260128-13
8 MAINTENANCE STRIP 24"
NTS
ROCK MULCH AT 4" MIN. DEPTH; EXPOSE NO
FABRIC ; SEE SCHEDULE FOR COLOR
WOVEN GEOTEXTILE FABRIC. OVERLAP 6" MINIMUM;
SECURE IN PLACE WITH POLY FABRIC STAPLES
ED-XX; SEE PLAN
2'-0" TYP
EDGE OF BUILDING
PLANTING CONDITION PER PLAN
LOUCKS
PROJ-260128-14
40465
STMH
931.84
40466
STMH
927.14
36 18 18
29
18 18
7 7
1313
2
CA DD f il es pr epar ed by t he Co ns ul tan t f or th is pr oje ct ar e
instruments of the Consultant professional services for use solely
with respect to this project. These CADD files shall not be used
on other projects, for additions to this project, or for completion
o f t h i s p r o j e ct b y o t h e r s w i t h o u t w r i t t e n a pp r o va l by t h e
Con su lt ant . W it h the C onsul ta nt 's appr ova l, othe rs ma y be
p e r m i t ted to ob tain co p ies o f t h e C AD D d r a win g f i l e s f o r
inf ormation and reference only. All intentional or unintentional
revisions, additions, or deletions to these CADD f iles shall be
made at the full risk of that party making such revisions, additions
or deletions and that party shall hold harmless and indemnify the
Consultant from any & all responsibilities, claims, and liabilities.
PLANNING
CIVIL ENGINEERING
LAND SURVEYING
LANDSCAPE ARCHITECTURE
ENVIRONMENTAL
12755 Highway 55, Suite R100
Plymouth 55441
763.424.5505
www.loucksinc.com
Pl
o
t
t
e
d
:
04
/
1
1
/
2
0
2
6
5
:
2
2
P
M
W:
\
2
0
2
6
\
2
6
0
1
2
8
\
C
A
D
D
D
A
T
A
\
S
U
R
V
E
Y
\
_
d
w
g
S
h
e
e
t
F
i
l
e
s
\
S
2
6
0
1
2
8
-
A
L
T
A
OUCKSL
CADD QUALIFICATION
QUALITY CONTROL
PROFESSIONAL SIGNATURE
SUBMITTAL/REVISIONS
ARDEN HILLS
APARTMENTS
3499 LEXINGTON AVENUE N
ARDEN HILLS, MINNESOTA 55126
ROERS COMPANIES
2 CARLSON PARKWAY N
SUITE 400
PLYMOUTH, MINNESOTA 55447
N
SCALE IN FEET
0 30 60 ALTA/NSPS
LAND TITLE
SURVEY
1 OF 1
(Per Schedule A of the herein referenced Title Commitment)
The North 445.66 feet of the East 586.60 feet of the South 600.5 feet of the North 1472.5 feet of the East 1/2 of the
Northeast 1/4 of Section 34, Township 30 North, Range 23 West, in Ramsey County, Minnesota.
Torrens Property, Certificate No. 323978.
DESCRIPTION OF PROPERTY SURVEYED
(Per Schedule B, Part II of the herein referenced Title Commitment)
The property depicted on this survey and the easements of record shown hereon are the same as the property and the
easements described in the Commitment for Title Insurance issued by Old Republic National Title Insurance Company, File No.
ORTE751424, effective date March 2, 2026. The numbers below correspond to those in the title commitment.
#1 & 3-9 do not require comment.
2.Any discrepancies, conflicts, easements, boundary line disputes, encroachments or protrusions, or overlapping of
improvements which would be disclosed by an inspection and accurate survey of the premises. Easement for drainage and
utilities per Document No. 2062553, and rights of the public, in that portion thereof taken for highway per Certificate
of Title No. 323978, are shown hereon the east side of the site.
TITLE COMMITMENT EXCEPTIONS
(The following items refer to Table A optional survey responsibilities and specifications)
1.Monuments placed (or a reference monument or witness to the corner) at all major corners of the boundary of the property,
unless already marked or referenced by existing monuments or witnesses to the corner are shown hereon. The relationship
to the surface of the ground of monuments, shown hereon, found or placed, is flush with the ground unless otherwise noted.
2.The address, as disclosed in documents provided to the surveyor, obtained by the surveyor, or observed while conducting
the fieldwork is 3499 Lexington Avenue North, Arden Hills, Minnesota 55126.
3.This property is contained in Zone X (areas determined to be outside the 0.2% annual chance floodplain) per Flood
Insurance Rate Map No. 27123C0020G, Community Panel No. 2703750020G, effective date of June 4, 2010.
4.The Gross land area is 261,425 +/- square feet or 6.00 +/- acres.
The Right of Way land area is 14,707 +/- square feet or 0.34 +/- acres.
The Net land area is 246,718 +/- square feet or 5.66 +/- acres.
6.(a) Any zoning classification, setback requirements, height and floor space area restrictions, and parking requirements,
shown hereon, was researched to the best of our ability and is open to interpretation. Per the City of Arden Hills Zoning
Map and City Code, on 04/06/26, information for the subject property is as follows:
Zone R-3 Townhouse and Low Density Multiple Dwelling District
Setbacks: Front 40 feet, Side 10 feet, Rear (Principle) 30 feet, Rear (Accessory) 10 feet;
Height: thirty five (35) feet;
Floor Area Ratio: Lot coverage shall not exceed thirty (30) percent of lot area.
7.(a) Exterior dimensions of all buildings are shown at ground level.
8.Substantial features observed in the process of conducting fieldwork, are shown hereon.
9.Striping of clearly identifiable parking spaces on surface parking areas and lots are shown hereon. The number and type of
clearly identifiable parking stalls on this site are as follows: 179 Regular + 10 Disabled = 189 Total Parking Stalls.
11.(a) We have shown underground utilities on and/or serving the surveyed property per Gopher State One-Call Ticket Nos.
260760751 & 260760766. The following utilities and municipalities were notified:
ARVIG (218)346-8174 CITY OF ARDEN HILLS (651)792-7850
COMCAST (812)483-7923 CITY OF SHOREVIEW (651)490-4661
CENTURYLINK (800)778-9140 FORGED FIBER (800)778-9140
MCI (800)624-9675 XCEL ENERGY (651)229-2427
CONSOLIDATED COMMUNICATIONS (800)778-9140 ZAYO BANDWIDTH (800)961-6500
i.Utility operators do not consistently respond to locate requests through the Gopher State One Call service for surveying
purposes such as this. Those utility operators that do respond, often will not locate utilities from their main line to the
customer's structure or facility. They consider those utilities “private” installations that are outside their jurisdiction.
These “private” utilities on the surveyed property or adjoining properties, may not be located since most operators will
not mark such "private" utilities. A private utility locator may be contacted to investigate these utilities further, if
requested by the client.
ii.Maps provided by those notified above, either along with a field location or in lieu of such a location, are very often
inaccurate or inconclusive. EXTREME CAUTION MUST BE EXERCISED BEFORE AN EXCAVATION TAKES PLACE ON OR
NEAR THIS SITE. BEFORE DIGGING, YOU ARE REQUIRED BY LAW TO NOTIFY GOPHER STATE ONE CALL AT LEAST
48 HOURS IN ADVANCE AT 811 or (651) 454-0002.
ALTA/NSPS OPTIONAL TABLE A NOTES
SURVEY REPORT
1.The Surveyor was not provided utility easement documents for the subject property except for those shown on the Survey.
2.The bearings for this survey are based on the Ramsey County Coordinate System NAD 83 (1986 Adjust).
3.Originating Benchmark: MnDOT Bridge wing wall named "6216 A" located in Arden Hills, in the southeast wing wall of
railroad bridge number 62003 over Trunk Highway 51, 0.2 mile north along Trunk Highway 51 (Hamline Avenue) from the
junction of Trunk Highway 51 and County Road E West, 29.0 feet east of northbound Trunk Highway 51, 25.5 feet south of a
railroad.
Elevation = 930.54 feet (NGVD29)
Site Benchmark: Top nut of hydrant located south of the site.
Elevation = 934.65 feet (NGVD29)
4.Tree diameters shown hereon are measured at breast height in inches.
5.Snow and ice conditions during winter months may obscure otherwise visible evidence of on site improvements and/or
utilities.
To Roers Acquisitions LLC; Catholic United Financial; and Old Republic National Title Insurance Company:
This is to certify that this map or plat and the survey on which it is based were made in accordance with the 2026 Minimum
Standard Detail Requirements for ALTA/NSPS Land Title Surveys, jointly established and adopted by ALTA and NSPS, and
includes Items 1 - 4, 6(a), 7(a), 8, 9 and 11(a) of Table A thereof. The field work was completed on 03/31/26.
Date of Plat or Map: 04/11/26
___________________________________________________
Matthew R. Arnold, PLS Minnesota License No. 54100
marnold@loucksinc.com
CERTIFICATION
04/11/26 SURVEY ISSUED
License No.
Date
I hereby certify that this survey, plan or report was
prepared by me or under my direct supervision and that
I am a duly Licensed Land Surveyor under the laws of
the State of
VICINITY MAP
Field Crew
54100
Project Lead
Drawn By
Checked By
Loucks Project No.
Minnesota.
Matthew Arnold - PLS
260128
MRA
SLS
MRA
CMS, SRK
04/11/26
SITE
PARKING STALL COUNT
DISABLED PARKING STALL MAPLE
ASH
2
LEGEND
CATCH BASIN
STORM SEWER
SANITARY SEWER
WATERMAIN
STORM MANHOLE
SANITARY MANHOLE
HYDRANT
GATE VALVE
SPOT ELEVATIONSIGN
LIGHT POLE
POWER POLE
CONTOUR
CONCRETE CURB
UNDERGROUND ELECTRIC
CONCRETE
TELEPHONE PEDESTAL
UNDERGROUND TELEPHONE
UNDERGROUND GAS
OVERHEAD UTILITY
CHAIN LINK FENCE
EXISTING BUILDING
RETAINING WALL
NO PARKING
UNDERGROUND FIBER OPTIC
ELECTRIC METER
GAS METER
CONIFEROUS TREE
PINE
DECIDUOUS TREE
GUY WIRE
1 SCHEDULE B II ITEM
ELECTRIC TRANSFORMER
HAND HOLE
ROOF DRAIN
FOUND 1/2 INCH OPEN IRON
MONUMENT UNLESS SHOWN
OTHERWISE
SET 1/2 INCH X 14 INCH IRON
MONUMENT, MARKED "LS 54100"
MAPPED WATERMAIN PAVERS
RIP-RAP
MAPPED UNDERGROUND ELECTRIC
MAPPED UNDERGROUND FIBER OPTIC
MAPPED UNDERGROUND TELEPHONE
BENCH
WILLOW
SPRUCE
LINDEN
BOXELDER
MULBERRY
BIRCH
ELM
MISC FRUIT
ARBORVITAE
OAK
WATER LINEFLAG POLE
AIR CONDITIONING UNIT
LOCUST
CEDAR
2
2
SETBACK LINE
FOUND STONE
FOUND RAMSEY COUNTY
CAST IRON MONUMENT
2
YARD LIGHT
CIVIL ENGINEERING | LAND SURVEYING | LANDSCAPE ARCHITECTURE
12755 Highway 55, Suite R100, Plymouth, MN 55441 | 763.424.5505
Stormwater Management Plan
3499 Lexington Avenue North Apartments
Arden Hills, MN
Prepared by Loucks
May 27, 2026
Loucks Project No. 260128.00
Attachment F
DRAFT REPORT
www.transportationcollaborative.com
To: Nick Asta, Developer
Roers Companies
From: Matt Pacyna, PE, Principal
Transportation Collaborative & Consultants, LLC
Date: June 26, 2026
Subject: 3499 Lexington Avenue Development Traffic Study; Arden Hills, MN
INTRODUCTION
TC2 completed a traffic study for the proposed residential development at 3499 Lexington Avenue in
the City of Arden Hills. The subject site, shown in Figure 1, is generally in the northwest quadrant of the
Harriet Avenue and Lexington Avenue (CR 51) intersection. The main objectives of the study are to
identify existing traffic operations within the study area, evaluate potential impacts of the proposed
development, and recommend improvements, if necessary, to ensure safe and efficient operations for
all users. The following study assumptions, methodology, and findings are offered for consideration.
Figure 1 Subject Site
Subject Site
Pi
n
e
T
r
e
e
D
r
Harriet Ave
CR E
Cannon Ave
Le
x
i
n
g
t
o
n
A
v
e
(
C
R
5
1
)
Ri
c
h
m
o
n
d
A
v
e
Sn
e
l
l
i
n
g
A
v
e
(
H
w
y
5
1
)
Attachment G
3499 Lexington Avenue Development Traffic Study June 26, 2026
Page 2
EXISTING CONDITIONS
Existing conditions were reviewed within the study area to establish current traffic conditions to help
determine impacts associated with the proposed development. The evaluation of existing conditions
included collecting traffic volumes, observing transportation characteristics, reviewing crash history,
and analyzing intersection capacity, which are described in the following sections.
Traffic Volumes
Vehicular intersection turning movement counts were collected at the following locations on Thursday,
June 4, 2026 from 7 to 9 a.m. and 4 to 6 p.m.; note that a 13-hour count (6 a.m. to 7 p.m.) was collected
at the Harriet Avenue and Lexington Avenue (CR 51) intersection to help identify if the intersection
meets any traffic signal warrants, which is discussed later in this report.
• County Road E and Pine Tree Drive
• Harriet Avenue and West Site Access
• Harriet Avenue and Benton Way East / East Site Access
• Harriet Avenue and Lexington Avenue (CR 51)
The peak hours represent 7:45 to 8:45 a.m. and 4:15 to 5:15 p.m. Average daily traffic (ADT) volumes
were provided by MnDOT or estimated based on the data collected.
Transportation Characteristics
Observations were conducted within the study area to identify various transportation characteristics
such as roadway geometry, traffic controls, speed limits, and multimodal facilities. A general overview
of key roadways within the study area is as follows:
• Lexington Avenue (CR 51) – a 3-lane minor arterial with a center two-way left-turn lane near Harriet
Avenue. There is multi-use trail along the east side of the corridor and sidewalk along the west side
from about 450 feet north of Harriet Avenue to the north. The speed limit is 40-mph.
• County Road E – a 5-lane minor arterial with a center two-way left-turn lane near Pine Tree Drive.
There is sidewalk along both sides of the road, and the speed limit is 35-mph.
• Harriet Avenue / Pine Tree Drive – a 2-lane minor collector that includes an additional northbound
lane within the Pine Tree Drive segment. There is sidewalk along the west side of the roadway from
CR E to about 500 feet to the south. The speed limit is 25-mph.
All other study roadways are 2-lane local facilities. The County Road E and Pine Tree Drive intersection
is signalized, while all other study intersections have side-street stop control. Existing geometrics, traffic
controls, and volumes in the study area are shown in Figure 2.
Crash History
Five (5) years of crash history were reviewed from 2021 through 2025 using MnDOT’s Crash Mapping
Analysis Tool (MnCMAT), which identified a total of two (2) crashes that occurred at the study
intersections. One crash occurred at the County Road E / Pine Tree Drive intersection and the other at
the Lexington Avenue (CR 51) / Harriet Avenue intersection. Neither crash involved a pedestrian /
bicyclist or resulted in a fatality or serious injury. Therefore, based on this review there does not appear
to be any safety issues from a crash frequency or severity perspective within the study area.
3499 Lexington Avenue Development Traffic Study Figure 2Existing Conditions
Legend
AM Peak Hour VolumePM Peak Hour VolumeEstimated Weekday ADT VolumeStop SignTraffic Signal
XXX(XXX)X,XXX N
4
1
(
1
4
5
)
1
7
(
6
9
)
436 (827)191 (104)
475 (835)74 (53)
3
,
6
0
0
1,025
1
2
,
8
0
0
1
3
,
0
0
0
14,50015,900
875
7 (1)28 (61)
10 (2)28 (43)
0
(
6
)
0
(
1
4
)
9 (16)1 (0)24 (57)
21 (29)6 (7)8 (4)
26
(
3
1
)
35
1
(
5
5
1
)
12
(
9
)
1
0
(
1
8
)
3
2
5
(
6
6
0
)
3
7
(
3
2
)
1 (1)26 (67)1 (7)
1 (1)37 (41)4 (14)
0
(
3
)
0
(
0
)
7
(
5
)
1
(
1
)
0
(
0
)
1
(
1
)
CR E / Lake Johanna Blvd
CR
5
1
/
L
e
x
i
n
g
t
o
n
A
v
e
Benton
W
a
y
Harriet Ave
3499 Lexington Avenue Development Traffic Study June 26, 2026
Page 4
Intersection Capacity
Intersection capacity was evaluated using Synchro / SimTraffic Software (version 11), which uses
methods outlined in the Highway Capacity Manual, 6th Edition. The software is used to develop
calibrated models that simulate observed traffic operations, account for peaking characteristics, and
identify key metrics such as intersection Level of Service (LOS) and queues. These models incorporate
collected traffic, pedestrian, and bicyclist volumes, traffic controls, heavy commercial vehicle activity
(i.e., buses and trucks), and driver behavior factors.
Level of Service (LOS) quantifies how an
intersection is operating. Intersections are graded
from LOS A to LOS F, which corresponds to the
average delay per vehicle values shown. LOS A
indicates the best traffic operation, while LOS F
indicates an intersection where demand exceeds
capacity. Overall intersection LOS A though LOS D
is considered acceptable in the study area. Existing
signal timing was provided by Ramsey County.
For side-street stop-controlled intersections, special emphasis is given to providing an estimate for the
level of service of the side-street approach. Traffic operations at an unsignalized intersection with side-
street stop control can be described in two ways. First, consideration is given to the overall intersection
level of service, which takes into account the total number of vehicles entering the intersection and the
capability of the intersection to support the volumes. Second, it is important to consider the delay on
the minor approach. Since the mainline does not have to stop, most delay is attributed to the side-street
approaches. It is typical of intersections with higher mainline traffic volumes to experience high-levels
of delay (i.e., poor levels of service) on the side-street approaches, but an acceptable overall intersection
level of service during peak hour conditions. For side-street stop intersections, the overall intersection
level of service is shown followed by the worst-approach level of service and delay.
The existing intersection capacity analysis results, summarized in Table 1, indicate that all study
intersections and approaches operate at an acceptable LOS B or better during the typical weekday
peak hours; no significant queuing was observed. Note that eastbound queues along Harriet Avenue at
Lexington Avenue (CR 51) range from approximately 45 to 60 feet (i.e., 2 to 3 vehicles) during the peak
hours; these queues do not impact the east site access or Benton Way East intersection operations.
Thus, there are no significant existing operational issues from an intersection capacity perspective.
Table 1 Existing Intersection Capacity
Intersection Traffic
Control
Level of Service (delay in seconds)
AM Peak Hour PM Peak Hour
CR E and Pine Tree Drive Signal A (4) A (7)
Harriet Avenue and West Site Access SSS A / A (1) A / A (4)
Harriet Avenue and Benton Way East / East Site Access SSS A / A (4) A / A (5)
Harriet Avenue and Lexington Avenue (CR 51) SSS A / A (7) A / B (12)
SSS – Side-Street-Stop
(overall intersection level of service is shown followed by the worst-approach level of service and delay)
Level of
Service
Average Delay / Vehicles
Unsignalized Signalized
A < 10 seconds < 10 seconds
B 10 to 15 seconds 10 to 20 seconds
C 15 to 25 seconds 20 to 35 seconds
D 25 to 35 seconds 35 to 55 seconds
E 35 to 50 seconds 55 to 80 seconds
F > 50 seconds > 80 seconds
3499 Lexington Avenue Development Traffic Study June 26, 2026
Page 5
PROPOSED DEVELOPMENT
The proposed development, shown in Figure 3, is in the northwest quadrant of the Harriet Avenue and
Lexington Avenue (CR 51) intersection. The project is a 168-unit market-rate multifamily residential
development, which would replace the existing 30,000 square foot Catholic United Financial office
building. A total of 300 parking spaces are planned through a combination of garage (148 spaces) and
surface lot (152 spaces) areas. Access to the site is planned to continue via the two existing driveways
along Harriet Avenue, which are located about 150 feet and 500 feet west of Lexington Avenue (CR 51).
Construction was assumed to be completed by the end of 2028.
Figure 3 Proposed Development Site Plan
3499 Lexington Avenue Development Traffic Study June 26, 2026
Page 6
TRAFFIC FORECASTS
Traffic forecasts were developed for year 2029 build conditions, which represents one year after
opening. The traffic forecasts account for general background growth and trip generation from the
proposed development. The following information summarizes the traffic forecast development process.
Background Growth
To account for general background growth in the study area, a one-half (0.5) percent annual growth
rate was applied to the existing traffic volumes to develop year 2029 background traffic forecasts.
Although daily traffic volumes have been stable or decreasing over the last 10+ years, the growth rate
was applied to provide a more conservative assessment.
Proposed Development Trip Generation
A trip generation estimate for the proposed development was created using the ITE Trip Generation
Manual, 12th Edition and includes trips for typical weekday a.m. / p.m. peak hours, as well as daily. The
proposed development, shown in Table 2, is estimated to generate 64 a.m. peak hour (15 in / 49 out),
64 p.m. peak hour (41 in / 23 out), and 750 daily (375 in / 375 out) trips. No reductions were included
for trips via walking, biking, or transit to provide a more conservative analysis.
The proposed development trip generation was compared to the existing observed site trip generation,
as well as the existing office building potential trip generation if it were fully occupied using the ITE
methodology. When compared to the actual counts collected at the existing office building, the proposed
development would represent an additional car to / from the site about every one (1) to two (2) minutes;
the proposed development would generate a similar amount of total peak hour trips when compared to
a fully occupied office building. This information is provided for informational purposes only.
Table 2 Trip Generation Summary
Land Use Type (ITE Code) Size AM Peak Hour PM Peak Hour Daily In Out In Out
Existing Office Building - Actual Counts 30,000 SF 19 2 5 22 164
Existing Office Building - Potential (710) 30,000 SF 47 7 10 51 394
Proposed Development
Multifamily Housing Mid-Rise (221) 168 units 15 49 41 23 750
Change from Existing - Actual Counts ( - 4) + 47 + 36 + 1 + 586
Change from Existing - Potential ( - 32) + 42 + 31 ( - 28) + 356
Site generated trips, which are illustrated in Figure 4, were distributed to area roadways based on the
global directional distribution shown, which was developed using a combination of existing travel
patterns and engineering judgment. The resultant year 2029 build condition traffic forecasts, which
includes the removal of the existing office traffic, are illustrated in Figure 5. Note that a future no build
condition was not reviewed given the relatively short timeframe between existing and year 2029, as well
as the minimal background growth anticipated.
3499 Lexington Avenue Development Traffic Study Figure 4Site Generated Trips
1
5
(
7
)
0
(
0
)
0 (0)4 (12)
0 (0)0 (0)
+50
+
2
5
0
+
2
2
5
+0+225
2 (6)2 (6)
5 (14)8 (4)
7
(
3
)
1
7
(
8
)
15 (7)2 (1)17 (8)
0 (0)1 (2)0 (0)
6
(
1
5
)
0
(
0
)
0
(
0
)
4
(
1
2
)
0
(
0
)
0
(
0
)
2 (6)17 (8)0 (0)
6 (15)5 (14)0 (0)
0
(
0
)
0
(
0
)
0
(
0
)
8
(
4
)
0
(
0
)
1
7
(
8
)
Legend
AM Peak Hour Site TripsPM Peak Hour Site TripsADT Site TripsStop SignTraffic SignalDirectional Distribution
XXX(XXX)+XXX N
30%
30%
35%
5%
+
2
2
5
+225
3499 Lexington Avenue Development Traffic Study Figure 5Year 2029 Build Conditions
Legend
AM Peak Hour VolumePM Peak Hour VolumeEstimated Weekday ADT VolumeStop SignTraffic Signal
XXX(XXX)X,XXX N
5
6
(
1
4
9
)
1
7
(
6
8
)
443 (839)190 (116)
482 (848)75 (54)
1,100
1
3
,
4
0
0
1
3
,
5
0
0
14,80016,550
2 (6)29 (67)
5 (14)35 (47)
7
(
3
)
1
7
(
8
)
24 (20)3 (1)40 (54)
21 (29)6 (9)8 (4)
25
(
4
5
)
35
6
(
5
5
9
)
12
(
9
)
11
(
2
9
)
3
3
0
(
6
7
0
)
3
8
(
3
2
)
2 (6)43 (62)1 (7)
6 (15)32 (54)4 (14)
0
(
3
)
0
(
0
)
7
(
5
)
8
(
4
)
0
(
0
)
1
7
(
8
)
CR E / Lake Johanna Blvd
CR
5
1
/
L
e
x
i
n
g
t
o
n
A
v
e
Benton
W
a
y
4
,
0
0
0
1,225
Harriet Ave
3499 Lexington Avenue Development Traffic Study June 26, 2026
Page 9
YEAR 2029 CONDITIONS
To understand impacts associated with the proposed development, a future intersection capacity
analysis was completed for year 2029 build conditions. Results of the future capacity analysis, shown in
Table 3, illustrate that all study intersections and approaches are expected to continue to operate at an
acceptable LOS B or better during the typical weekday peak hours. The change in delay for any
intersection or approach is expected to range from one (1) to three (3) seconds, while peak queues are
not expected to change by more than one (1) vehicle within the area. Thus, there are no significant
operational issues from an intersection capacity perspective anticipated with the addition of the
proposed development.
Table 3 Year 2029 Build Condition Intersection Capacity
Intersection Traffic
Control
Level of Service (delay in seconds)
AM Peak Hour PM Peak Hour
CR E and Pine Tree Drive Signal A (4) A (7)
Harriet Avenue and West Site Access SSS A / A (4) A / A (4)
Harriet Avenue and Benton Way East / East Site Access SSS A / A (4) A / A (5)
Harriet Avenue and Lexington Avenue (CR 51) SSS A / A (7) A / B (13)
SSS – Side-Street-Stop
(overall intersection level of service is shown followed by the worst-approach level of service and delay)
Although not needed from an intersection capacity analysis perspective, a preliminary traffic signal
warrant analysis was completed for the Harriet Avenue and Lexington Avenue (CR 51) intersection to
understand if future signalization could be considered. Based on this review, traffic volumes do not
meet the threshold to warrant signalization nor are there any safety related issues at this time. Therefore,
traffic volumes, operations, and crash history should continue to be monitored to determine if / when an
alternative traffic control may be needed at this location.
SITE PLAN CONSIDERATIONS
A review of the proposed site plan does not indicate any major issues. However, the following items are
offered for further consideration between the City and / or project team.
• Locate signage and landscaping to avoid creating any sight distance issues.
• Review truck maneuverability to limit potential internal circulation conflicts.
• Align the east site access across from Benton Way East to eliminate the offset intersections and
reduce the risk of any queues along Harriet Avenue from impacting driveway operations.
• Preserve the right-of-way and / or provide a sidewalk along Lexington Avenue (CR 51) and Harriet
Avenue within the site limits to improve multimodal connectivity and access in the area.
3499 Lexington Avenue Development Traffic Study June 26, 2026
Page 10
CONCLUSIONS
Based on the findings of the study, the following conclusions are offered for consideration.
1) There does not appear to be any safety issues from a crash frequency or severity perspective within
the study area.
2) All study intersections and approaches operate at an acceptable LOS B or better during the typical
weekday peak hours and there are no significant existing operational issues from an intersection
capacity perspective.
3) The project is a 168-unit market-rate multifamily residential development, which would replace the
existing 30,000 square foot Catholic United Financial office building. Construction was assumed to
be completed by the end of 2028.
4) Traffic forecasts were developed for year 2029 build conditions, which represents one year after
opening; the traffic forecasts account for a 0.5% annual background growth and trip generation from
the proposed development.
a. The proposed development is estimated to generate 64 a.m. peak hour (15 in / 49 out), 64 p.m.
peak hour (41 in / 23 out), and 750 daily (375 in / 375 out) trips.
5) Under year 2029 build conditions, all study intersections and approaches are expected to continue
to operate at an acceptable LOS B or better during the typical weekday peak hours.
6) There are no significant operational issues from an intersection capacity perspective anticipated
with the addition of the proposed development.
7) Traffic volumes at the Harriet Avenue and Lexington Avenue (CR 51) intersection do not meet the
threshold to warrant signalization nor are there any safety related issues at this time to justify a
change in traffic control.
8) The following items are offered for further consideration between the City and / or project team.
• Locate signage and landscaping to avoid creating any sight distance issues.
• Review truck maneuverability to limit potential internal circulation conflicts.
• Align the east site access across from Benton Way East to eliminate the offset intersections and
reduce the risk of any queues along Harriet Avenue from impacting driveway operations.
• Preserve the right-of-way and / or provide a sidewalk along Lexington Avenue (CR 51) and
Harriet Avenue within the site limits to improve multimodal connectivity and access in the area.
ML
A
Z
G
A
R
A
S
S
O
C
I
A
T
E
S
10
3
4
0
V
I
K
I
N
G
D
R
.
SU
I
T
E
1
5
0
(p
)
9
5
2
-
9
4
3
-
8
0
8
0
ED
E
N
P
R
A
I
R
I
E
,
M
N
5
5
3
4
4
(f
)
9
5
2
-
9
4
3
-
8
0
8
8
ww
w
.
m
l
a
z
g
a
r
.
c
o
m
Co
m
m
e
n
t
s
Da
te
#
Revisions
Da
t
e
:
5
/
2
6
/
2
0
2
6
Page M of 1
1. Standard Reflectance of 80/50/20 unless noted otherwise
2. Not a Construction Document, for Design purposes only
3. Standard indoor calc points @ 30" A.F.F. unless noted otherwise
4. Standard outdoor calc points @ Grade unless noted otherwise
5. Egress calc points @ 0" A.F.F.
6. Mlazgar Associates assumes no responsibility for installed light levels
due to field conditions, etc.
Dr
a
w
n
B
y
:
B
S
RL
M
A
P
r
o
j
e
c
t
#
:
1
8
7
3
6
9
34
9
9
L
E
X
I
N
G
T
O
N
A
V
E
N
ARD
E
N
H
I
L
L
S
,
M
N
SI
T
E
P
H
O
T
O
M
E
T
R
I
C
Sc
a
l
e
:
1
"
=
2
5
'
Calculation Summary
Label CalcType Units Avg Max Min Avg/Min Max/Min
Luminaire Schedule
Symbol Qty Label
SITE
Manufacturer Description Arrangement Lum. Lumens Lum. Watts LLF
Illuminance Fc 0.40 10.5 0.0 N.A.N.A.
6 OA PRV-P-PA1A-740-U-T4W Single 4348 30.7 0.900
2 OB PRV-P-PA1C-740-U-T4W Single 9164 72.1 0.900
21 OC BVYW0410LAJUDBK Single 1184 18.31 0.900
1 SP1 PRV-PA2B-740-U-T4W Single 19431 151 0.900
4 SP2 PRV-PA2B-740-U-5WQ Back-Back 20332 151 0.900
1 SP3 PRV-PA2A-740-U-T3 Single 15749 112 0.900
50'-0"
10
'
-
0
"
20'-0"
20
'
-
0
"
CO
M
M
O
N
S
68 UNITS @ 4 STORIES1
LEVEL OF GARAGE BELOW1
POOLTOT LOT
PATIO
ENTRY
TRASH PAD
RETENTION
6.1
1
6.1
2
6.1
3
6.2
COURTS
DOG RUN
276 SF
Stair
276 SF
Stair
"750'-3
5'
-
0
"
SP2
MH: 27
SP2
MH: 27 MH: 27
SP2
MH: 27
SP2
OB
MH: 10
SP3
MH: 27
MH: 27
SP1
OB
MH: 10
OC
MH: 8
OC
MH: 8
OA
MH: 8
MH: 8
OA
OC
MH: 8
OC
MH: 8
OA
MH: 8
MH: 8
OA
MH: 8
OA
OC
MH: 8
OC
MH: 8
OC
MH: 8
OA
MH: 8
OC
MH: 8
OC
MH: 8
MH: 8
OC
MH: 8
OC
MH: 8
OC
OC
MH: 8
OC
MH: 8
OC
MH: 8
OC
MH: 8
OC
MH: 8
MH: 8
OC
MH: 8
OC
OC
MH: 8
OC
MH: 8
1.9 1.11.11.11.11.01.01.01.01.00.0 1.5 1.01.91.91.70.80.30.20.10.10.1
0.8
1.2 1.1 0.91.01.01.11.11.11.01.01.01.01.0 1.01.0 1.11.11.11.11.11.11.11.01.00.0 1.0
0.7 0.00.10.10.10.20.20.30.40.5
0.0
0.6 0.00.80.80.80.80.80.80.80.80.8
0.8
0.5
0.0 0.00.00.00.00.00.00.00.00.00.0
0.0
0.0
0.0
0.0
0.00.00.00.00.00.00.00.0
0.60.0
1.2 1.31.41.41.51.51.51.41.41.3
0.8
1.2 1.21.31.31.41.41.41.41.41.31.21.2 1.3 0.9 0.00.00.00.10.10.10.20.20.30.41.2 0.71.2 1.11.21.31.41.41.41.41.31.31.7 0.6
0.0
1.20.00.0
0.00.00.00.00.00.00.0
0.0
0.0
0.0
0.00.10.10.10.10.20.30.40.5
0.8
0.0
0.0
0.7
2.22.11.92.01.20.50.20.10.10.0 0.0 1.30.00.00.00.00.00.00.00.00.00.0 0.1
0.0
0.00.00.00.00.00.00.00.00.0
0.0
0.0 0.0
0.00.00.00.00.00.00.00.00.0
0.8
0.0 1.1 0.60.60.60.60.60.60.70.80.91.00.0 1.10.0 0.50.20.10.10.10.00.00.00.0
0.1
1.1
0.5 0.50.50.50.50.50.50.50.50.5 0.00.5 0.50.40.40.40.40.50.50.60.70.8
4.2
0.5 0.4 0.10.10.10.20.20.20.30.30.30.40.5 0.40.5 0.50.50.50.50.50.50.50.50.5
0.6
0.4
0.0 1.51.40.60.20.10.10.10.00.0
0.6
0.0 1.20.00.00.00.00.00.00.00.00.00.0 0.0 0.8 0.90.90.90.90.90.90.80.80.80.81.5 0.81.4 0.80.80.80.80.80.70.80.81.00.0 0.8
0.7
0.0
0.60.60.60.60.60.60.60.60.6 0.60.7 0.50.70.70.70.70.60.60.60.60.6
0.0
0.7 0.00.6 0.00.00.00.00.00.00.00.00.00.6 0.0
0.0
0.10.10.10.20.20.30.30.40.40.5 0.0
0.0
0.00.00.00.00.00.00.00.0
0.00.2 0.0
0.0
0.00.00.00.00.00.00.00.10.1
0.0
0.0
0.2 2.42.11.91.71.71.92.22.22.11.90.0 0.40.0 0.20.10.10.00.00.00.00.00.0
0.3
0.9
2.2 2.01.81.71.71.82.02.22.42.6 0.12.5 2.62.01.71.51.61.92.42.22.02.11.3 2.7 2.0 0.40.50.71.01.31.72.02.32.62.62.2 2.22.4 1.81.61.61.71.92.12.32.52.7
3.4
2.4
0.0 0.40.30.20.10.10.00.00.00.0
3.0
0.0 1.80.00.00.00.00.00.00.00.00.00.0 0.0 4.2
0.0
2.82.52.22.01.91.92.12.42.70.9 3.91.7 3.32.62.31.91.81.81.91.91.8
0.0
3.1
2.6 0.02.11.91.71.71.82.02.22.53.1 2.83.2 3.42.42.11.91.81.82.02.22.52.8
0.2
3.6 0.23.6 0.00.00.00.00.00.00.00.00.12.4 0.1 0.00.30.40.60.81.11.41.82.22.63.3 0.1
1.4 0.91.11.41.51.61.81.81.81.7
0.0
1.5 0.31.41.41.61.71.81.81.91.81.81.7 1.6 0.0
0.5
0.00.00.00.00.0
0.00.00.00.00.6 0.00.5 0.00.00.00.00.10.10.10.20.21.4 0.00.0 1.60.00.00.00.00.00.00.00.00.0 0.10.0 0.10.00.00.00.0
0.00.00.00.00.0
0.8
0.0 1.3
0.0
1.41.51.61.71.81.81.81.71.60.0 1.4 1.51.41.92.52.31.82.21.90.70.20.2 1.6
0.4 0.00.00.00.00.00.00.10.10.10.0 0.3 0.00.50.70.91.21.61.82.02.12.22.1 0.2
0.0
0.0
0.10.10.00.00.00.00.00.00.0
0.0
0.0
0.0
0.00.00.00.00.00.00.0
0.00.01.7
0.0
0.1 2.01.41.52.02.62.31.82.22.00.7 1.80.2 1.90.10.00.00.00.00.00.00.00.00.0 0.3 1.8
0.2
1.51.51.61.71.92.12.22.32.21.6 2.0 1.91.61.51.51.71.92.02.12.22.22.1 2.1
0.0 0.00.00.00.00.00.00.00.00.0
0.0
0.0 0.00.00.0
0.00.00.00.00.00.00.00.1
0.0 0.1 0.10.10.10.10.10.10.10.10.10.10.0 0.10.0 0.10.10.10.10.00.00.00.00.0
0.0
0.1
0.0 0.00.00.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.10.10.10.1
0.8
0.0 0.0 0.00.00.00.00.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.00.00.0
0.1
0.0
0.0 0.20.20.20.20.10.10.10.00.0
0.1
0.0 0.10.00.00.00.00.00.00.00.00.00.0 0.0 0.1 0.10.10.10.10.10.10.10.10.10.10.2 0.10.1 0.10.10.10.10.10.10.10.10.10.0 0.1
0.1
0.0
0.00.00.00.00.10.10.10.10.1 0.00.1 0.00.10.10.10.10.10.10.10.10.1
0.1
0.1 0.00.1
0.00.00.0
0.00.00.00.00.00.00.0 0.0
0.0
0.00.00.00.00.00.00.00.00.00.0 0.0
0.0 0.00.00.00.00.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.00.00.00.0
0.1
0.0 0.0
0.00.00.00.00.00.00.00.00.00.0
0.0
0.0
0.0 0.00.00.00.00.00.00.00.00.00.0
0.0
0.0 0.00.00.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.00.00.00.00.0 0.0 0.0 0.00.00.00.00.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.00.00.0
0.0
0.0
0.0
0.0
0.00.00.00.00.00.00.00.00.0 0.0
0.0
0.00.00.00.00.00.00.00.00.00.0 0.0
0.0 0.10.10.10.00.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.00.00.0
0.0
0.0
0.1 0.00.00.00.00.00.10.10.10.10.1 0.00.1 0.00.00.00.00.00.00.00.00.00.0
0.1
0.1 0.00.0 0.00.00.00.00.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.00.00.00.00.0 0.0
0.2 0.10.10.10.10.20.20.20.20.20.3 0.2 0.10.20.20.30.30.30.30.30.30.3
0.1
0.2 0.0
0.00.00.00.00.00.00.00.00.0
0.00.1 0.00.1 0.00.00.00.00.00.00.00.00.00.3 0.00.0 0.00.00.00.00.00.00.00.00.0 0.30.0 0.20.00.00.00.00.00.00.00.0
0.00.0
0.0 0.2 0.30.30.30.30.30.20.20.20.20.20.1 0.20.1 0.20.30.30.40.40.40.40.40.4
0.0
0.2
0.1 0.00.00.00.00.00.00.00.00.00.0 0.1
0.0
0.10.10.10.20.20.20.20.20.30.3 0.0
0.0 0.40.10.10.10.00.00.00.00.00.0
0.0
0.0
0.0
0.00.00.00.00.00.00.00.00.0
0.3
0.0
0.1 0.30.30.30.40.40.50.60.60.60.6 0.30.3 0.30.10.00.00.00.00.00.00.00.0
0.0
0.6 0.40.0 0.30.30.30.40.40.40.40.40.40.3 0.4 0.30.40.40.40.40.40.40.30.30.30.3 0.4
0.2 0.10.10.10.10.10.10.10.10.1 0.10.1 0.10.20.20.20.20.20.20.20.10.10.0 0.1 0.1
0.0
0.10.10.10.10.10.10.10.10.10.1 0.10.1 0.10.10.10.10.10.10.10.10.10.0 0.1
0.0
0.0
0.00.00.00.00.00.00.00.00.0 0.00.0 0.00.10.10.10.10.10.10.10.10.1
3.4
0.0
0.0 0.10.00.00.00.00.00.00.00.00.0
0.0
0.0 0.00.00.00.00.00.0
0.00.00.00.00.0
0.0
0.2 0.20.20.20.20.20.20.20.20.2
0.1
0.2 0.20.20.20.20.20.20.20.20.20.20.2 0.2 0.1
0.1
0.00.00.00.00.00.00.00.00.10.2 0.10.2 0.10.10.10.10.10.10.10.10.20.2 0.1
0.0
0.20.00.00.00.00.00.0
0.00.00.0
0.0
0.0
0.0
0.00.00.00.00.00.00.00.00.00.1 0.0
0.0 0.00.20.30.30.30.30.30.30.30.20.0 0.0 0.20.00.00.00.00.00.00.00.00.00.0 0.1
0.0 1.51.51.41.41.31.10.90.73.60.0 0.0 1.20.00.00.00.00.00.00.00.00.0
1.6
0.0 1.0 0.10.10.10.10.20.31.21.71.51.41.4 1.11.3 1.83.55.54.71.61.31.00.91.00.0 1.3
2.4 1.51.81.71.71.61.31.11.43.0
0.0
3.5 0.21.21.01.21.51.71.81.91.91.8
2.4
7.1 0.0
0.00.00.00.00.00.00.0
0.00.00.00.6 0.00.3 0.00.00.00.00.00.10.10.10.1
0.0
0.0
0.3 0.00.00.00.00.00.00.10.10.1
0.1
0.1 0.01.11.51.31.11.00.90.91.84.05.7 0.1
0.0 0.00.00.00.00.00.00.00.00.00.0
0.0
0.0
0.0
0.00.00.00.00.00.0
0.00.00.00.7
0.0
0.0 6.40.00.00.00.00.00.00.00.00.0 0.00.0 0.0
0.00.00.00.00.00.00.00.00.0
1.3
0.0 0.8
0.0
0.70.70.80.91.01.11.11.11.10.0 1.0 0.60.70.60.50.00.00.00.00.00.00.0 1.0
1.7 1.41.21.51.82.12.42.82.92.60.0 2.0 0.91.61.61.70.10.60.00.00.00.0
1.7
2.3 2.6 0.00.00.00.00.00.10.10.10.20.22.8 1.74.1 3.02.52.62.01.61.11.11.51.80.0 0.6
1.6 0.10.10.20.30.51.32.22.62.2
0.0
2.0 0.01.21.01.00.92.31.81.51.31.6
3.6
2.4
0.0 0.00.00.00.00.00.00.00.00.00.0
0.1
0.0
0.0 0.00.00.00.00.00.00.00.00.0
0.00.0
0.1 0.00.00.00.00.00.00.00.00.0
0.0
0.0
0.0
0.10.10.20.20.51.22.12.52.12.3 0.0
0.0 1.10.80.70.00.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.00.00.0
1.1
0.0
0.0 1.90.00.00.00.00.00.00.00.00.0 0.00.0 1.30.00.00.00.00.00.0
0.00.00.0
0.5
0.0 2.1
0.0
1.22.53.80.25.52.91.21.01.30.0 1.9 1.52.32.32.22.01.81.51.31.10.90.2 1.6
0.0 0.00.00.00.00.00.00.00.00.00.3 0.0
0.0
0.00.00.00.00.00.10.30.40.4
0.0
0.0
0.0 0.20.20.10.00.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.00.00.0
0.4
0.0
0.0 0.20.00.00.00.00.00.00.00.0 0.30.0 0.30.00.00.00.00.00.00.00.00.00.0 0.0 0.2 0.50.91.21.54.33.10.80.20.20.20.2 0.20.2 0.20.30.30.30.30.30.30.30.3
0.2
0.2
0.0 0.10.20.20.20.10.00.00.00.0
0.2
0.0 0.10.00.00.00.00.00.00.00.00.00.0 0.0 0.1 0.20.20.20.30.30.30.50.00.60.60.1 0.20.1 0.10.10.10.10.10.10.10.10.10.0 0.4
0.1
0.0
0.30.40.50.71.82.31.30.70.2 0.20.1 0.20.10.20.20.20.20.20.20.20.2
0.0
0.1 0.00.2
0.00.0
0.00.00.00.00.00.00.00.2 0.0
0.0
0.00.00.00.00.00.00.00.10.20.2 0.0
0.0 0.00.00.00.00.00.00.00.00.0 5.50.0 0.30.00.00.00.00.00.00.00.0
0.00.0
0.0 0.6
0.0
4.54.53.61.80.90.50.30.40.40.1 0.54.2 0.60.60.60.60.60.50.50.40.4
0.0
0.5
0.8 0.04.95.52.91.30.50.40.50.60.6 9.20.8 8.70.80.80.80.80.70.60.50.50.4
2.8
0.7 0.1
3.5
0.00.00.00.00.00.00.00.00.13.4 0.1 0.00.20.91.21.00.90.80.70.81.43.8 0.1
0.3 2.03.06.63.91.20.80.60.40.3
6.0
0.3 0.40.40.40.40.40.40.40.40.40.30.3 0.3 0.0
0.0
0.00.00.00.00.00.00.00.00.01.2 0.00.6 0.00.00.00.10.40.60.50.50.40.0 0.0
0.0
0.3
0.00.00.00.00.00.00.00.00.0 0.00.0 0.00.10.10.60.80.70.70.60.50.71.3 0.0
0.0 0.00.00.00.00.00.00.00.00.00.0
0.0
0.0 0.40.00.00.00.00.00.00.00.00.0
0.0
0.0
1.9 2.22.32.32.22.11.91.71.51.52.2 1.7 1.62.02.12.22.22.22.12.02.01.9
0.0
1.5 0.0
0.00.0
0.00.00.00.00.00.00.00.02.1 0.01.9 0.10.10.10.20.30.40.60.91.32.5 0.00.0 0.00.00.00.00.00.00.00.00.0 2.00.0 0.00.0
0.00.00.00.00.00.00.00.0
2.0
0.0 5.4 2.72.82.92.92.72.52.32.01.81.90.0 3.60.0 8.75.12.81.30.50.20.10.00.0
0.0
2.5
1.0 0.00.00.00.00.10.10.10.20.30.0 0.6 0.01.41.61.81.92.02.02.01.91.81.7 0.4
0.0 0.00.00.00.00.00.00.00.00.00.0
0.0
0.0
0.0
0.00.00.00.00.0
0.00.00.00.01.3
0.0
0.0 1.51.94.26.59.96.30.00.00.00.0 1.70.0 2.00.00.00.00.00.00.00.00.00.0
0.0
0.0 1.90.0 1.41.51.61.71.81.81.91.81.91.6 1.9 1.42.12.32.52.72.72.82.82.62.52.3 1.9
2.1 3.63.12.62.32.01.81.92.12.30.0 2.1 2.71.40.70.40.20.10.10.00.00.0
0.0
2.2 3.4 3.32.82.42.21.91.71.61.71.92.23.5 2.93.0 3.12.62.42.22.01.92.02.12.40.0 2.4
3.8 0.20.30.40.60.81.11.51.92.3
0.0
3.8 0.13.02.52.21.91.71.71.82.02.32.6 2.9 0.0
0.00.00.00.00.00.00.00.00.00.0
0.1 0.00.1 0.00.00.00.00.00.00.00.00.0
2.30.0
2.7 2.52.62.52.42.32.12.01.92.0
3.2
2.4 1.82.93.03.12.82.62.32.01.81.92.3 2.2 2.4 0.10.10.10.20.30.40.60.91.21.52.3 2.22.1 2.62.62.52.32.01.81.61.61.64.0 1.9
0.1
2.8
0.00.00.00.00.00.00.00.00.0
0.0
0.1
0.0
0.10.20.30.40.60.81.11.51.9
0.0
0.0
0.0
2.7
3.72.01.10.50.20.10.00.00.0
0.0
0.0 4.00.00.00.00.00.00.00.00.00.00.0 0.0
1.4 0.90.80.60.60.60.83.90.60.63.2 0.7 1.62.80.91.01.21.41.61.82.22.5
0.0
0.6 0.1 0.00.00.00.00.00.00.00.00.00.11.1 0.11.3 0.20.30.40.61.42.01.91.81.73.4 0.1
0.0
0.00.00.00.0
0.00.00.00.00.0
2.8
0.0
0.0
0.00.00.10.10.10.10.20.20.30.6 0.0
0.0 3.02.62.32.01.93.24.78.80.20.00.0 0.00.0 0.00.00.00.00.00.00.00.00.0
0.0
0.0
0.0
0.00.00.00.00.00.0
0.00.00.0
0.0
0.0
0.0
0.00.00.00.00.10.10.10.10.20.3 0.0
0.0 3.53.93.22.62.21.81.82.43.30.00.0 0.00.0 0.00.00.00.00.00.00.00.00.0
1.6
0.0
0.0 0.45.60.00.00.00.00.00.00.00.0 1.70.0 1.90.00.00.00.00.00.00.00.00.0
1.8
0.0 1.40.0 2.11.92.01.91.61.31.00.93.03.2 1.4 0.81.51.72.12.52.93.74.13.42.72.3 1.3
0.0 0.00.00.00.00.00.00.00.00.0 1.30.0 0.00.00.0
0.00.00.00.00.00.00.00.0
0.0 2.4
1.4
1.41.61.82.02.32.62.72.82.90.0 2.60.0 2.22.02.01.70.00.00.00.00.0
0.0
2.8
2.7 0.01.41.51.51.51.61.61.71.92.1 1.32.5 1.22.82.82.72.62.42.22.01.71.4
0.1
2.3 1.7
1.2
0.10.10.10.20.20.30.51.21.61.4 1.7 0.01.71.71.71.61.51.41.31.21.21.2 1.6
2.9 2.32.62.83.03.02.92.62.42.1
1.3
2.3 1.40.10.00.00.00.00.00.00.00.00.0 2.0 0.8
0.0
1.71.61.51.41.31.11.00.90.81.9 0.81.6 0.80.80.90.90.91.01.01.11.30.0 0.8
1.2
0.0
0.30.61.31.81.61.71.61.61.5 0.21.3 0.11.11.01.01.01.01.01.01.11.11.2 1.4 0.0
1.90.00.00.00.00.00.00.00.00.0
0.2 0.0
0.0
0.00.00.00.00.00.00.00.10.10.1 0.0
0.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.0
0.1
0.0 0.0 0.10.00.00.00.00.00.0 0.10.0 0.00.00.00.00.00.0 0.0
0.0 0.00.00.00.00.0
0.0
0.0 0.00.00.00.10.00.0
0.0
0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0
0.1
0.0
0.0 0.00.00.00.00.00.0 0.0
0.0
0.00.00.00.00.00.0 0.0
0.0
0.0
0.00.00.00.00.0
0.0
0.0
0.0
0.00.00.00.00.0
0.0
0.0
0.0 0.00.00.00.00.10.0 0.00.0 0.01.60.00.00.00.0
10.5
0.0 0.01.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.1 0.0
0.0 0.00.00.00.00.00.0 0.0 0.60.00.00.00.00.0
0.0
0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.02.80.20.0 0.0
0.0 0.00.00.00.00.0
0.0
0.0 0.00.00.00.00.00.00.0 0.0 0.0
0.00.0
0.00.00.00.00.0 0.00.0 0.00.00.00.00.0
0.0
0.0
0.0 2.00.19.60.00.0
0.0
0.0 0.00.08.20.10.00.00.2 0.0 0.0 0.00.00.00.00.00.10.1 0.00.0 0.00.02.90.00.00.0 9.4
0.0
1.10.0
0.00.00.00.0
0.0
0.0
0.0
0.00.00.00.00.0
0.0
0.0
0.0
0.0
0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.0 0.0
0.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.0
0.0
0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.0
0.0 0.00.00.00.00.0
0.0
0.0 0.00.00.00.00.00.0
0.0
0.0
0.0 0.00.00.00.00.00.0
0.0
0.0
0.0
0.00.0
0.00.00.0
0.00.0
0.0 0.00.00.00.00.0
0.0
0.0 0.00.0
0.00.00.00.00.0
0.0 0.0
0.1
0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0
0.0
0.0
0.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0
0.0
0.0 0.00.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.0 0.0
0.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.0
0.0
0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.0 0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0 0.00.0
0.0 0.00.00.00.00.0
0.0
0.0 0.00.00.00.00.00.00.0 0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0
0.0
0.0
0.0 0.0
0.0
0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.0 0.0
0.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.0
0.1
0.0 1.4 0.00.00.10.00.00.00.0 0.30.0 2.60.00.00.00.0
0.0
0.1
0.1 0.00.00.10.10.1
0.0
0.1 0.00.10.10.00.00.1
0.0
0.1 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0
0.1
0.0
0.0 0.00.00.00.00.0
0.0
0.0 0.00.00.0
0.00.00.00.0
0.0 0.0 0.00.00.21.46.00.70.0 0.00.0 0.00.00.00.00.0
0.0
2.6
0.0 0.00.10.10.10.10.0 0.00.0 0.00.00.00.00.00.0
0.1
0.0 0.00.0 0.00.00.00.00.00.1 0.0 0.00.00.00.00.00.00.0 0.0
0.0 0.10.10.10.20.40.0 0.0 0.10.00.00.00.00.0
0.1
0.4 0.1 0.10.10.20.20.10.10.1 0.10.1 0.10.10.10.10.10.0 0.1
0.0 0.00.00.00.00.0
0.0
0.0 0.00.00.00.00.00.10.1 0.0
0.0 0.00.00.00.00.00.0
0.0
0.0
0.0
0.00.00.0
0.00.0
0.20.0
0.0 0.00.00.00.00.0
0.1
0.0 0.30.00.00.00.00.00.0 0.0 0.1 0.10.00.00.10.10.11.2 0.10.8 0.10.10.10.10.10.0 0.1
0.1
0.0
0.00.00.00.00.0 0.00.0 0.00.10.10.10.10.2
4.5
0.0 0.00.1
0.00.00.00.00.0
0.0 0.0
0.0
0.00.00.00.00.00.0 0.0
0.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.0
0.0
0.0 0.0
0.00.00.0
0.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.0
0.0
0.00.00.00.0
0.0
0.0
0.0
0.0
0.00.00.00.00.00.0 0.0
0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0
0.0
0.0
0.0
0.00.0
0.00.00.00.0 0.0
0.0
0.00.00.00.00.00.0 0.0
0.0
0.0
0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0
0.0
0.0
0.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0
0.0
0.0 0.00.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.0 0.0
0.0
0.00.00.00.00.0 0.1
0.0
0.0
0.00.00.00.00.00.0 0.0
0.0
0.0
0.10.00.00.00.00.0 0.00.0 0.00.00.00.00.0
0.0
0.0
0.0 0.00.00.00.00.00.0 1.90.0 0.04.40.30.00.00.0
0.0
0.0 0.0
0.0
0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.0 0.0
0.0 0.00.00.00.00.0
0.1
0.0 0.00.00.00.00.00.00.0 0.0 0.0
0.2
0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.0
0.0
0.0
0.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.0 0.0 0.0
0.00.00.00.00.00.0
0.0 0.0
0.0
0.00.00.00.00.00.0 0.0
0.0
0.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.0
0.0
0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.0
0.0
0.00.00.00.00.0 0.00.0 0.0
0.00.00.00.00.0
0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0 0.00.0
0.0 0.00.00.00.00.0
0.0
0.0 0.00.00.00.00.00.00.0 0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.0
0.0
0.0
0.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0
0.0
0.0 0.00.0
0.00.00.00.00.0
0.0 0.0
0.0
0.00.00.00.00.00.0
0.0
0.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.0
0.0
0.0 0.0
0.00.00.00.00.00.0
0.0
0.0
0.0 0.00.00.00.00.00.0
0.0
0.0 0.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.0 0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0
0.0
0.0
0.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.0 0.0 0.0 0.00.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0
0.0
0.0 0.00.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.0 0.0
0.0 0.0
0.00.00.00.00.0 0.0
0.0
0.0
0.00.00.00.00.00.0
0.0 0.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.0
0.0
0.0
0.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.0 0.0
0.0
0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.0 0.0
0.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.0 0.0 0.0
0.0
0.0 0.00.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.0 0.00.0 0.00.00.00.00.00.00.0 0.0 0.0 0.00.00.00.00.00.0 0.0 0.00.00.00.00.00.00.0 0.0
1
1
1
1
1
1
1
1 1
1
1
1
1
1
1
1
1
1 1
1
1
1
1
1
1
11
11
1111
1
11
1
1
1
1
1
1
1
1
1
1
1
0.50.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5 0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.50.50.50.50.50.50.50.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.10.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1 0.1 0.1
0.1
0.1 0.1 0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.1
0.10.10.10.10.10.10.1
0.1
0.1
0.1
0.1
0.1
0.1
Attachment H
Two Carlson Parkway | Suite 400 | Plymouth, MN 55447
roerscompanies.com
Arden Hills – Security Plan
The community at 3499 Lexington Avenue North will be secured through a comprehensive, multi-
layered security program designed to protect residents, guests, and property at all times. Access to all
residential buildings, parking areas, and shared amenity spaces will be managed through a cloud-based
key fob access control system, issuing each leaseholder proximity credentials that are programmed to
their specific unit and deactivated automatically upon lease expiration — eliminating the need for physical
re-keying and ensuring that only authorized individuals can enter controlled areas. The property will also
be equipped with a 24-hour digital IP camera surveillance system covering all building entries, parking
facilities, pedestrian walkways, and common areas, with high-definition footage retained for a minimum of
30 days and accessible only to authorized management personnel and law enforcement. Complementing
these technology-based systems, an on-site property manager will be present during regular business
hours and available on call around the clock to respond to resident concerns, coordinate with emergency
services, and oversee the day-to-day security of the community — providing a consistent, accountable
human presence that reinforces the safety and well-being of all who call this property home.
Sincerely,
_____________________________
Nick Asta
Developer
Attachment I
Developer summary of comments (June 30, 2026 Neighborhood Meeting)
Building Location on Site - neighbors expressed desire for the building to move further east and
south because they feel the building is too close to the condos.
Buffer to West - neighbors in the condo building requested more buffering (trees and possibly a
fence) between the two properties.
Walking Trails - neighbors expressed interest in seeing more walking trails on site.
Nature & Wildlife - there were questions about the nature preserve, wildlife in the area,
potential for "bird safe windows" and potential changes to the adjacent pond.
Plantings - there was a comment about the amount of invasive buckthorn on site and a request
to remove in favor of native plantings.
Snowplow - there were concerns about who plows the snow and where cars go when the plow is
in process.
Traffic - there were many concerns about the traffic in the area and doubts raised about the
validity of the 3rd party traffic study provided.
Density - there were many concerns about the density of the project being more than necessary.
I plan to address these comments at the planning commission meeting and will try to
incorporate as many of them as possible into a future plan. As mentioned yesterday, we will try
to have updated drawings by the meeting, but we may need some additional time.
Thanks!
Nick Asta
Developer
m: 651.252.7019
nick.asta@roerscompanies.com
Attachment J
Attachment K
From:Bill Guelker
To:AH Planning
Cc:Jonathan Warner; Jim Carroll; Aaron Van Brunt; Andrew Asp; Maggie Smith; Susie Strodtman; Nina Ritter;
Stephen Forestell
Subject:Proposed Plan for Apartments on Lexington
Date:Monday, June 29, 2026 3:23:51 PM
[You don't often get email from . Learn why this is important at
https://aka.ms/LearnAboutSenderIdentification ]
First of all I would express my frustration with the short notice for a proposal of this magnitude and for the limited
information provided. When I applied for an addition to our house it took the city 3 months to approve it. The
process was much like the Spanish Inquisition. It was 400 square feet and by the grilling I received you might have
thought I was asking to build a 167 unit apartment building. The planning commission and the City Council were
very concerned how my 400 square foot addition would impact the neighborhood.
There are numerous issues to be considered and hoping the applicant will address them after potential approvals is
asking the residents for a huge leap of faith. This is not as simple as approving rezoning and altering the city
comprehensive plan.
If approved this project would change the entire character of the neighborhood. You would be asking the current 80
or so single family residents to endure massive amounts of traffic coming and going from the facility. Currently
Harriet Avenue is used constantly by residents for walking as they pass around Benton Way. The current amount of
traffic is manageable for the walkers especially in the evening when the current office is closed. The potential of 167
more cars using the road at all hours will make the use of the road unsafe and unusable for walkers.
Currently getting on Lexington from Harriet is already a dangerous endeavor. Adding significantly more traffic at
that intersection will be very unsafe. The safety of the Hunters Park development residents should certainly be a
major consideration.
In order to approve this project the city will have to approve rezoning and alter the master plan both of which were
part of the reason many of us chose to live here. To do so must have a significant reason. The simple desire to build
a huge complex should not be a reason. Increasing the city’s tax base should not be a reason. How will this
proposal improve the lives of the current residents? I would think that would be of primary consideration.
Commercial development should be a priority of the city but it should not be done at the expense of the livability of
current residents.
I strongly encourage the planning commission to deny this proposal. If not denied it should be tabled until we are
provided with a comprehensive plan that will include detailed information from which we can form a more educated
opinion.
Lest you think this is just another “not in my backyard “ concern you should know I was a strong supporter of the
new Fire Station. Why? Simply because I felt it was to the overall benefit of the community. A huge apartment
complex, not so much.
Respectfully Submitted
William and Adrienne Guelker
1152 Benton Way, Arden Hills
In order to approve this project the city will have to approve rezoning and alter the master
plan both of which were part of the reason many of us chose to live here. To do so must
have a significant reason. The simple desire to build a huge complex should not be a reason.
Increasing the city’s tax base should not be a reason. How will this proposal improve the
lives of the current residents? I would think that would be of primary consideration.
Commercial development should be a priority of the city but it should not be done at the
expense of the livability of current residents.
I strongly encourage the planning commission to deny this proposal. If not denied it should
be tabled until we are provided with a comprehensive plan that will include detailed
information from which we can form a more educated opinion.
Lest you think this is just another “not in my backyard “ concern you should know I was a
strong supporter of the new Fire Station. Why? Simply because I felt it was to the overall
benefit of the community. A huge apartment complex, not so much.
Respectfully Submitted
William and Adrienne Guelker
1152 Benton Way, Arden Hills
Sent from my iPhone
On Jun 29, 2026, at 3:36 PM, Maggie Smith wrote:
Hot take incoming! I’m sure I’m outnumbered in my opinion, I am even in my
own house, and I’m not technically the homeowner in my situation so what say do
I have? Well you all let me on the board so I will be speaking my mind I guess! I
have a very yes in my back yard mindset, ESPECIALLY when it comes to
housing. As a person who is greatly impacted by the lack of housing and therefore
the exhorbitant cost of housing in our modern economy I can’t see this as a bad
thing given the fact that the area is already home to so many. Unless we want to
de-commodify housing altogether, or accept the rising rates of homelessness as
inevitable, the only solution forward in the current economic framework we live
in is more housing. Would I like to see more traffic direction if they put this in?
Yes. Maybe we can even convince them to get us a sidewalk on Harriet to
mitigate the traffic/pedestrian issue.
We live in a metro area. Yes we are out of the center of the city, but we are very
lucky and privileged people to have homes to keep us safe, we should always be
in favor of extending that privilege to others, and instead of rejecting it outright,
looking for ways to mitigate the situation so our needs can be met along with
others. Traffic lights, sidewalks, yield signs, stop signs, these are all ways the city
can work with us.
But that’s just my one opinion. I’m sure everybody feels their own very strong
feelings.
Maggie
On Mon, Jun 29, 2026 at 3:23 PM Bill Guelker <> wrote:
First of all I would express my frustration with the short notice for a proposal of
this magnitude and for the limited information provided. When I applied for an
addition to our house it took the city 3 months to approve it. The process was
much like the Spanish Inquisition. It was 400 square feet and by the grilling I
received you might have thought I was asking to build a 167 unit apartment
building. The planning commission and the City Council were very concerned
how my 400 square foot addition would impact the neighborhood.
There are numerous issues to be considered and hoping the applicant will
address them after potential approvals is asking the residents for a huge leap of
faith. This is not as simple as approving rezoning and altering the city
comprehensive plan.
If approved this project would change the entire character of the neighborhood.
You would be asking the current 80 or so single family residents to endure
massive amounts of traffic coming and going from the facility. Currently
Harriet Avenue is used constantly by residents for walking as they pass around
Benton Way. The current amount of traffic is manageable for the walkers
especially in the evening when the current office is closed. The potential of 167
more cars using the road at all hours will make the use of the road unsafe and
unusable for walkers.
Currently getting on Lexington from Harriet is already a dangerous endeavor.
Adding significantly more traffic at that intersection will be very unsafe. The
safety of the Hunters Park development residents should certainly be a major
consideration.
In order to approve this project the city will have to approve rezoning and alter
the master plan both of which were part of the reason many of us chose to live
here. To do so must have a significant reason. The simple desire to build a huge
complex should not be a reason. Increasing the city’s tax base should not be a
reason. How will this proposal improve the lives of the current residents? I
would think that would be of primary consideration.
Commercial development should be a priority of the city but it should not be
done at the expense of the livability of current residents.
I strongly encourage the planning commission to deny this proposal. If not
denied it should be tabled until we are provided with a comprehensive plan that
will include detailed information from which we can form a more educated
opinion.
Lest you think this is just another “not in my backyard “ concern you should
know I was a strong supporter of the new Fire Station. Why? Simply because I
felt it was to the overall benefit of the community. A huge apartment complex,
not so much.
Respectfully Submitted
William and Adrienne Guelker
1152 Benton Way, Arden Hills
Sent from my iPhone
From:
To:Jake Reilly
Subject:Re: Proposed high density building at 3499 Lexington Ave
Date:Wednesday, July 1, 2026 11:16:43 AM
Jake- I had a typo- please correct this item:
The pond, dog run, and pickle ball court would be in the NORTH EAST corner. Please
include that and make changes to your notes. The plan is correctly reflecting it, my notes is
what had the typo. Sorry about the typo. Thanks.
On Jun 30, 2026, at 9:54 PM, wrote:
Jake,
It was so nice to meet you today! Here’s a photo of my plan with some of my
talking points on a proposed solution that would fit the neighborhood.
-Rotate the building 90 degrees clockwise so the building faces the west. The
apartment building would be at or near the location of the current building on the
property. We know that is buildable land as the current building is there. This
creates a set back from Lexington and the storm drainage they need behind the
building. They could also continue the sidewalk all the way to Harriet. The
developer could ask for a set back variance from Lexington Ave only if needed.
One was granted to Goodwill up just up the street.
- the parking lot would also rotate and be on the west side of the property. This
would allow for a narrow residential buffer of trees and green space adjacent to
Hunters Park.
- the underground parking could have access through the parking lot or from
Harriet. They have multiple access points available in this configuration. Because
the lot is sloped on the Lexington side it would disguise the parking structure.
- the surface lot entrance would be accessed from Harriet near the westward
entrance (by what currently exists). This would move the parking lot entrance
farther from the intersection of Harriet and Lexington making it less congested
right at the corner.
- the pond, pickle ball court, and dog run could remain on the northwest corner as
that is a less buildable area of the property. The north east pond (already existing)
would be a location for drainage.
- the tree installment on Harriet could remain as a buffer to the residents of
Benton Way.
- the pollinator garden and parking lot storm drainage could move to the south
west of the lot which creates a buffer for the two properties that are near the
corner of the south west of proposed development. It could be a buffer for
Hunters Park.
-Fire access would now be available on all sides of the apartment building. Their
current plan depends on the commercial property to the north to serve as their fire
access. If that commercial would be developed that could be a fire access issue.
This creates fire access on their own property.
- A residential buffer would be created on the residential sides of the property (
south and west)
- I cut and pasted their components and reworked the plan. It is the same footprint
size of building the developer proposed.
Thank you for looking at this proposal.
<image1.jpeg>
On Jun 30, 2026, at 6:32 PM, Jake Reilly
<JReilly@cityofardenhills.org> wrote:
You are brilliant.
Would you be so kind as to send me a copy of what you handed to the
developer just in case there isn’t one left behind?
Thanks! - JBR
Please Note: City hall is observing summer hours through Friday, September 4th.
Hours are Monday through Thursday from 7:30 AM to 5:00 PM and Friday from
7:30 AM to 11:30 AM.
Jake Reilly
Book a time to meet with me
Mobile: 763-204-0107
Office: (651) 792-7824
jreilly@cityofardenhills.org
<image001.jpg>
<image002.png>
Confidentiality Notice:
This email and any files transmitted with it are solely for the use of the intended recipient or entity and
may contain confidential or privileged information. If you received this email by mistake, please notify
the sender and delete it from your system. Thank you.
From:
Sent: Tuesday, June 30, 2026 1:31 PM
To: Jake Reilly <JReilly@cityofardenhills.org>
Cc: Emily Rousseau <ERousseau@cityofardenhills.org>
Subject: Re: Proposed high density building at 3499 Lexington Ave
Jake,
Thanks for reaching out. Yes, please add me to the meeting and to the
notice for the planning commission updates. My home faces the
current parking lot and 3499 building. I’ve attached a photo for
reference because there is a small and narrow buffer between the
two properties. You barely know it’s a parking lot and can’t see the
building despite the small size of the buffer. The current development
plan removes the entire residential buffer on the west side. The new
building and my home be would looking directly into each others’
windows. Please insist that a residential buffer be created on the
west side of the property by moving the buildings to the east and north
side of the property. We would likely support the project with changes
to the building location and a residential buffer.
<image003.jpg>
On Jun 30, 2026, at 12:30 PM, Jake Reilly
<JReilly@cityofardenhills.org> wrote:
Thank you, Councilmember Rousseau for forwarding
Traci Youngs’ comments,
Traci, thank you for your thoughtful comments. I look
forward to meeting you at this evening’s developer-led
meeting.
Would you like me to add you to the list of interested
parties who have shared comments via email and who
will receive a notice from me when the Planning
Commission materials are available on our website later
this week?
-Jake
Please Note: City hall is observing summer hours through Friday,
September 4th. Hours are Monday through Thursday from 7:30
AM to 5:00 PM and Friday from 7:30 AM to 11:30 AM.
Jake Reilly, AICP, EDFP
Book a time to meet with me
Community Development Director
City of Arden Hills
1245 West Highway 96
Arden Hills, MN 55112
Cell Phone: (763) 204 -0107
Office Phone: (651) 792-7824
jreilly@cityofardenhills.org
<image001.png>
Confidentiality Notice:
This email and any files transmitted with it are solely for the use of the intended
recipient or entity and may contain confidential or privileged information. If you
received this email by mistake, please notify the sender and delete it from your
system. Thank you.
From: Emily Rousseau <ERousseau@cityofardenhills.org>
Sent: Tuesday, June 30, 2026 12:16 PM
To: ; Jake Reilly
<JReilly@cityofardenhills.org>
Subject: Re: Proposed high density building at 3499
Lexington Ave
Thanks Traci,
I believe the next step with city involvement will be
review and a public hearing at the Planning Commission.
Can you also share this with Councilmember Kurt Weber
and director Reilly JReilly@cityofardenhills.org? They are
the liaison to the planning commission and the staff that
would share public comments with the planning
commission. I think it's best to share this feedback early
in these discussions so it can be considered at multiple
levels of the process.
Have a nice afternoon,
Emily
Sincerely,
Traci Youngs
On Jun 28, 2026, at 5:52 PM,
:
Hi Emily,
Thank you for your reply. I will be at the
meeting and would be happy to discuss the
residential buffer. Thank you for the
opportunity. I certainly understand not
having vacant properties and there are quite
a few nearby. Rotating the building and
putting it in the north east part of the
property would be a way to bridge the gap
between the developer’s profitability,
development for the city of Arden Hills, and a
residential buffer for the established
property owners in the area. I look forward to
seeing you on Tuesday. Thank you!
Sincerely,
Traci
On Jun 28, 2026, at 3:55 PM,
Emily Rousseau
<ERousseau@cityofardenhills.org>
wrote:
Hi Traci,
Thank you for your email.
The developer came to a
council meeting earlier this year
with a preliminary concept for
the location. I did ask staff what
other developers had been
seeking in this space, and they
were all residential, similar or
larger than what Roers is
currently proposing.
I know it's challenging that the
market for office space is not
the same as it used to be, and it
would also be nice for our city to
not have vacant properties on
Lexington.
I appreciate the feedback about
a residential buffer zone by
rotating the building. Are you
and your family able to make it
to the meeting on Tuesday to
discuss your concerns with the
developer?
Kind regards,
Emily
From:
Sent: Friday, June 26, 2026 12:59
PM
To: *AHCouncil
<city.council@cityofardenhills.org>
Subject: Fwd: Proposed high
density building at 3499 Lexington
Ave
[Some people who received this
message don't often get email
from
Learn why this is important at
https://aka.ms/LearnAboutSenderIdentification ]
>
> Dear Arden Hills City Council
Members and Mayor,
>
> Yesterday I became aware of a
proposed multi residential
building proposed for the adjacent
property at 3499 Lexington Ave. I
am opposed to the current plan
because it does not allow a
residential buffer for my property
at 4 Pine Tree Drive. Currently,
Roers’s plans are to have a 4 story
building 50 feet from my property
line. This is unacceptable and not
a residential buffer at all. Fifty feet
from a four story building with
decks and windows facing us is
incredibly close. There are no
residential properties in the
northeast corner of the lot.
Rotating the building and locating
it in the northeast part of the
property provides privacy and a
residential buffer for ALL
properties: the proposed
apartment building, and for all the
owners of condos and single
family housing off of Pine Tree
Drive. The proposed parking lot
would then be in the location of
the existing parking lot (when
rotated and moved) which creates
minimal change for the residential
areas, basically using the same
buffer that already exists.
>
> This would increase traffic on
Harriet Ave. so a turn lane or a
light should also be considered by
the council for the intersection of
Lexington and Harriet.
>
> The developer is proposing a
rezone for high density dwellings.
The current zoning already allows
for multi-family dwellings at 20
per acre. This developer should
have to stay within that current
zoning requirement. The city
would not allow a high density
rezone to pass for the TCAP which
is open land. Why would that
suddenly be allowed at 3599
Lexington Ave where the area is
already adjacent to family owned
property? The developer needs to
work within the density allowed at
20 units per acre.
>
> I do not approve of the current
plan presented by Roers. I
propose the city insist on create a
residential buffer by rotating the
building and placing it in the
northeast corner of the property. I
also propose that a right turn lane
and possible traffic control light
be added to the corner of
Lexington and Harriet. I do not
support a rezone because the
current zoning rules allow for 20
units per acre so the developer
needs to work within that
established zoning criteria. The
city would not change the zoning
for open land so it should not be
changed for this property either.
>
> Thank you for reading this email
from a concerned adjacent
property owner.
>
> Sincerely,
> Traci Youngs
> 4 Pine Tree Drive
> Arden Hills, MN
Guiding Plan for the
B2 District
Approved by the City Council
October, 27 2008
Guiding Plan for the
B2 District
Citizens Advisory Committee
Ted Brausen – Brausen Service Station
LoAnn Crepeau -- Resident
Leon Hass – Hass Bros. Construction
Ed von Holtum – Economic
Development Commission / Resident
Ron Johnson – Arden Pharmacy /
Resident
Gregg Larson – Resident
Elizabeth Modesette – Resident /
Planning Commission
David Monson – Resident
Christine Pistotnik – Resident
Jim Huninghake – Economic
Development Commission
Rob Boeck – Resident
Sheldon Bruce – Resident
Dick Eckert – Resident
Moose Gianetti – Resident
David Sand – Planning
Commission / Resident
City Planning Commission
Clayton Larson, Chair
Roberta Thompson, Vice Chair
Clayton Zimmerman
Elizabeth Modesette
Janet Stodola
Andy Holewa
Daniel Reiff
David Sand (Alternate)
City Council
Stan Harpstead, Mayor
David Grant
Brenda Holden
Fran Holmes
Dave McClung
City Staff
Ron Moorse, City Administrator
Noah Simon, Assistant City Administrator
James Lehnhoff, AICP, Community
Development Director
Meagan Beekman, City Planner
Kristine Giga, PE, Civil Engineer
Consultants
McCombs Frank Roos Associates
William Weber, AICP, Director
James Kalkes, Landscape Architect
Spack Consulting
Michael Spack, PE, Traffic Engineer
Maxfield Research
Mary Bujold, Market Analyst
Andrew Greene, Market Analyst
Hay Dobbs
Tom Dobbs, AIA, Urban Designer
City of Arden Hills
1245 W. Highway 96
Arden Hills, Minnesota 55112-5743
651-792-7800 www.ci.arden-hills.mn.us
2008
Guiding Plan for the B2 District i
Guiding Plan for the B2 District
Introduction and Summary ...................................................................................1-1
Current Physical Conditions .................................................................................2-1
District Market Analysis ........................................................................................3-1
Land Use and Public Improvements Plan ............................................................4-1
District Design Guidelines ....................................................................................5-1
Traffic Analysis and Plan ......................................................................................6-1
Implementation Program ......................................................................................7-1
Appendix A: Traffic Study ................................................................................... A-1
Appendix B: Comments from the Community Visioning Meeting ....................... B-1
List of Figures
1 Study Area ................................................................................................................2-2
2 Aerial Photograph of the Study Area .......................................................................2-3
3 Existing Land Use, 2008 ..........................................................................................2-5
4 Land Use Plan, 1998...............................................................................................2-12
5 Zoning Districts, 2008 ............................................................................................2-13
6 Existing Lane and Traffic Control..........................................................................2-19
7 Existing PM Peak Hour Traffic ..............................................................................2-20
8 Existing Daily Traffic Volume ...............................................................................2-20
9 Land Use Plan...........................................................................................................4-5
10 County Road E Streetscape Cross section ................................................................4-9
11 Illustrative Guiding Plan.........................................................................................4-11
List of Tables
1 Average Annual Daily Traffic ................................................................................2-18
2 Existing Level of Service........................................................................................2-19
3 Summary of Housing Demand in Downtown Arden Hills.......................................3-3
4 Demand for Neighborhood Retail Space .................................................................3-4
5 Demand for Specialty Retail Space .........................................................................3-5
6 Retail Uses by Median Size of Store .......................................................................3-7
7 Projected Demand for Office Space .........................................................................3-9
30 October Guiding Plan for the B2 District 1-1
Introduction and Summary
In November 2007, the City of Arden Hills approved a moratorium on development and
redevelopment in the B2 Zoning District, which only exists in the vicinity of County
Road E between Lexington Avenue and Minnesota Highway 51. The purpose of the
moratorium was to provide time to create a long-term redevelopment plan for that area.
With great assistance from the community and the steering committee, a guiding plan that
addresses the complex issues of transportation, land use intensity, appearance, access and
long-term viability has been prepared. This plan will be instrumental in advancing a
community vision on how to redevelop and enhance the commercial properties north and
south of County Road E.
To guide the planning process and facilitate the meetings, the City retained McCombs
Frank Roos Associates (MFRA) to assist staff in preparing this plan. The MFRA
planning team included three sub-consultants: Maxfield Research for the residential and
commercial market study, Spack Consulting for the traffic analysis, and Hay Dobbs
Architects for illustrations. The steering committee included 15 members of the
community, including residents, businesses and property owners. Other landowners from
the study area also attended and participated in the committee meetings.
The planning process examined existing conditions, created a long-range redevelopment
vision and guiding principles, addressed transportation questions, evaluated market
potential, reviewed land uses and prepared design guidelines. The plan includes specific
recommendations, an implementation strategy and estimates of public costs.
Overall, the plan guides the way for the next major step in the evolution of the County
Road E corridor to a place with a stronger sense of community center.
Notable Findings and Recommendations
Guiding Principles
These principles will be used by the City of Arden Hills to help guide the evolution of the
B2 District including plans for land use, urban design, public facilities and circulation.
Elaboration and details will be added as the plan progresses.
Place: Create a visual impression that the B2 District is a distinct, identifiable and
special place in Arden Hills.
Land Uses: Allow and encourage a variety of land uses in the district potentially
including retail and service businesses, offices, high-density housing, places to eat
Introduction and Summary
1-2 Guiding Plan for the B2 District 30 October
and drink, industry that has high employment density and attractive buildings,
education and indoor recreation.
Intensity and Scale: As redevelopment occurs, generally increase the height of
the buildings and amount of each site they cover.
Local: Create a district that serves the needs and desires of residents of Arden Hills.
Quality: Ensure that all private and public improvements are of a high quality in
terms of appearance, function and longevity.
Civic: Communicate that the district is “everybody’s neighborhood” and a center of
public life in Arden Hills (a distinction perhaps to be shared with the redeveloped
TCAAP site) through the use of public plazas or open space, small private spaces
usable by the public, improved sidewalks and streetscape.
Movement: Provide for safe and efficient auto movement as land use intensifies
but also greatly improve the environment for pedestrians and bicyclists.
Green: Provide year-‘round greenery and color throughout the district through
generous landscaping of private sites and the public street edges. Add one or more
green gathering spaces in the corridor. Improve the public’s use of the Country
Insurance woods, its intended purpose.
Role of the City: Establish the primary role of the City in the district as planning,
leadership, zoning and public improvements. Do not rule out the application of
municipal financial assistance in land redevelopment.
Continuity: Maintain long-term support for the principles and policies of the
Guiding Plan for the B2 District throughout the entire Arden Hills family including
elected and appointed officials and staff.
Environmental Conservation and Sustainability: Promote the use of
green building practices, sustainability, and energy conservation to reduce the
environmental impact of new development and redevelopment.
Land Use Plan
The land use plan calls for moving beyond several outmoded developments and using
land in ways that are more consistent with the important role that this corridor may play
in Arden Hills. The plan recommends expanding the number of potential land uses in the
district to include multiple-family housing. Refer to Figure 9 on page 4-5.
Introduction and Summary
30 October Guiding Plan for the B2 District 1-3
Illustrative Guiding Plan
Several of the principles conveyed in this land use plan and the district design guidelines
have been expressed in the Illustrative Guiding Plan, Figure 11, on page 4-11. That
sketch is meant to illustrate one possible way in which this plan might be realized but is
certainly not the only development pattern. The market may propose a wide variety of
additional building patterns that are just as desirable (if not more so) and which are also
consistent with this plan and the City’s zoning regulations.
Urban Design Guidelines
A comprehensive set of design guidelines for both private and public improvements will
help ensure a high quality of physical improvements. Refer to chapter 5.
These and other statements will guide the future design of the study area:
The B2 District will be a place where people can live, work and play.
The district will be a compact, architecturally diverse, pedestrian-friendly community
with a distinct identity.
It will provide sidewalks and places for people to gather and socialize.
Design guidelines will be followed to promote an attractive environment with lasting
value. The district is dedicated to the belief that we desire to integrate nature, home,
work and leisure.
Redesign of County Road E
County Road E is proposed to be redesigned as a landscaped boulevard with a central,
landscaped median that will focus the left-turn movements, improve traffic safety, greatly
enhance appearances and set the tone for private redevelopment. The redesign of the
County Road will also introduce a pair of bicycling lanes, a greatly needed addition.
The improvements preliminarily planned for transforming County Road E into Lake
Johanna Boulevard are listed below and illustrated by the sketch on page 4-7 and Figure
11, Illustrative Guiding Plan, on page 4-11.
A traffic signal system at the future intersection located between Pine Tree Drive and
Lexington Avenue.
Replacement signals, arms and poles for the existing signal systems at (all optional):
- The eastern ramp terminals of Highway 51.
- Pine Tree Drive.
- Lexington Avenue.
Boulevard trees spaced at an average of 40 feet.
Relocating the electrical boxes to a less visible location or screening where feasible.
A planted median that may include trees along with shrubs, tall grasses and/or annual
flowers.
Decorative lighting at the automobile scale (on the existing bases, located 200 feet
apart); optional extra: decorative lighting at the pedestrian scale located
approximately 50 to 70 feet apart).
Introduction and Summary
1-4 Guiding Plan for the B2 District 30 October
Benches and trash receptacles.
A pair of new continuous concrete sidewalks (6 feet wide) and connections to
businesses.
Bollards.
Annual flowers (in beds or raised planters), perhaps in partnership with the adjacent
businesses.
Seasonal banners on the light poles.
Striped or colored pedestrian crossings.
Bus waiting shelters.
A pedestrian and bicyclist connection over Highway 51, which may be a separate
bridge, a new bridge, or an addition to the existing bridge.
A detailed engineering and design study is recommended for the public improvements to
County Road E to refine the plan and determine feasibility.
Traffic Study
A detailed traffic study report was prepared. (Refer to Chapter 6 for a summary and
Appendix A for the full report.) To provide a safe multi-modal corridor, the following
long range improvements are recommended:
Construct a landscaped median on County Road E from Highway 51 to Lexington
Avenue to convert the private driveways along County Road E into right-in/right-out
accesses.
Consolidate driveways whenever feasible to limit the conflict points along the
corridor.
Provide left turn lanes at public street intersections.
Provide on street bicycle lanes.
Provide sidewalks.
Improve the landscaping to provide a human scale to the corridor.
Provide eleven foot wide travel lanes which will reinforce the 35 mph speed limit.
Minimize traffic signs within the corridor whenever feasible.
Extend the bicycle and pedestrian facilities through the County Road E/Hamline
Avenue interchange when it is reconstructed.
Reconstruct the corridor using the existing curb and gutter system to minimize the
cost. This will also shorten the construction period, lessening the impact on local
businesses.
County Road E is under the jurisdiction of Ramsey County. Therefore, the City must
collaborate with the County to gain approval of these improvements.
Left-Turns Only at Signalized Intersections
It is important to note that the improvements to County Road E call for building a raised,
landscaped median that would eliminate left-turn movements except at the signalized
intersections at the Highway 51 ramps, Pine Tree Drive, a planned new intersection
between Pine Tree Drive and Lexington Avenue, and Lexington Avenue. Additional
engineering and review will be needed prior to implementation.
Introduction and Summary
30 October Guiding Plan for the B2 District 1-5
Intersection of County Road E, the Holiday Inn Site and the Arden
Plaza Driveway
After the first round of redevelopment, the driveways on County Road E for the Holiday
Inn site and the Arden Plaza site will experience significant delay and queuing in the p.m.
peak hour even though the overall intersections will operate within traffic engineering
standards. From a traffic engineer’s perspective, this is acceptable as an interim situation
because it is not expected to pose a safety problem and little queuing is anticipated on
County Road E. Long term, the queuing will impact the vitality of the redevelopments
and could lead to safety problems.
Therefore, those driveways should be realigned midway between Pine Tree Drive and
Lexington Avenue to provide a four-legged intersection that could be controlled with a
traffic signal. Left turn lanes and shared right/through lanes should be built on the new
north and south legs of the intersection to provide adequate egress. The signal should be
installed when agreement is reached with the most directly affected land owners and
when the traffic volumes at the intersection meet the criteria for installing a traffic signal
per the Minnesota Manual on Uniform Traffic Control Devices. When the traffic signal
is installed at the new intersection it will operate at LOS B in the 2030 Build p.m. peak
hour. This leaves capacity to accommodate significantly more redevelopment as long as
the traffic from the redevelopment is focused at the signalized intersection.
A process is proposed for coordinating the construction of the median in County Road E
(and its restrictions on left turns) with the redevelopment of adjacent properties and new
driveway locations.
Implementation Program
A preliminary cost estimate for a complete package of traffic, streetscape, pedestrian and
bicyclist improvements along the new Lake Johanna Boulevard was prepared and totals
an estimated $2.0 million, though additional detail and review will be needed. That total
includes $0.5 million for a pedestrian and bicyclist connection over Minnesota Highway
51. This cost estimate does not include any required replacement of roads or underlying
infrastructure prior to any improvements. Potential funding sources include:
City general funds
Special assessments on benefiting properties
Private sources
Municipal State-Aid funds
Tax increment financing
Tax abatement
Ramsey County funds
Grants.
Introduction and Summary
1-6 Guiding Plan for the B2 District 30 October
Supplementary Road Name
As a supplement to “County Road E,” the local name used on County Road 149 west of
Minnesota Highway 51, “Lake Johanna Boulevard” is proposed. This additional name
will help identify the road as a local facility with a connection to a nearby natural feature
and thereby personalize it. The County Road E name could still be used by residents and
businesses where needed.
Committee Consensus and Support
The citizens advisory committee has been closely involved every step of the way and
supports the draft plan.
20 October Guiding Plan for the B2 District 2-1
Current Physical Conditions
Location
The B2 District is located in east-central Arden Hills approximately one-half mile south
of I-694 and between State Highway 51 on the west and Lexington Avenue (County
Highway 51) on the east. Arden Hills is located in the north-central portion of the Twin
Cities metropolitan area, roughly equidistant from the two metro centers and within the
regional freeway ring.
The study area has good access from both regional, subregional and local roads. I-694
provides very good regional access, while Highway 51 and Lexington Avenues provide
sub-regional connections; both roads link south to Minnesota Highway 36 in Roseville
and I-94 in St. Paul. Lexington Avenue has a full interchange with I-694 but Highway 51
to Hamline Avenue have only partial access, which is scheduled to be removed as part of
the preliminary I-694 reconstruction plans.
County Road E is not a major east-west roadway for Ramsey County. To the west, it
merges into Lake Johanna Boulevard and terminates at Cleveland Avenue on the western
side of Arden Hills; to the east, it travels only another two miles and ends near the City of
Vadnais Heights. County Road E is also designated as Ramsey County State-Aid
Highway 15 between Snelling Avenue to the west and Victoria Street to the east.
Connections to the study area from within Arden Hills are provided by Highway 51 and
Lexington Avenues, Lake Johanna Boulevard, Snelling Avenue, Lake Valentine Road,
County Road E2 and other routes.
The study area is just as well linked to the adjacent community of Shoreview as to Arden
Hills by virtue of road access and proximity. Lexington Avenue is the common border of
the two Cities.
Nearby major features include:
A large commercial and industrial area to the north;
Low-density residential neighborhoods to the west, south and east;
Tony Schmidt Regional Park on Lake Johanna to the west and Island Lake County
Park to the east;
Bethel University to the immediate northwest and Northwestern College on the south
side of Lake Johanna;
Rosedale Shopping Center and related commercial properties approximately 2.5 miles
to the southwest via Highway 51;
Current Physical Conditions
2-2 Guiding Plan for the B2 District 20 October
Figure 1
Study Area
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-3
Figure 2
Aerial Photography
Current Physical Conditions
2-4 Guiding Plan for the B2 District 20 October
The site of the former Twin Cities Army Ammunition Plant approximately two miles
to the northwest via Highway 51 and US Highway 10; the development master plan
for that 585 acre site includes various types of housing, office buildings, hotel, retail
and service commercial buildings, neighborhood parks, a major community park, and
a wildlife corridor.
The study area is bounded by the Soo Line - Canadian Pacific Railroad tracks on the
north, Highway 51 on the west and east, respectively, and Harriet Avenue on the south.
Figures 1 and 2 illustrate the boundaries of the study area.
Current Land Use, 2008
The Vicinity
Immediately north of the study area is a corridor owned by the Soo Line - Canadian
Pacific Railroad. Between the railroad tracks and I-694 along the east side of Highway
51 is a district of industry and offices; along both sides of the Lexington Avenue frontage
are retail commercial areas including a Super Target store on the Shoreview side.
Immediately south of the study area is a neighborhood of townhouses and single-family
homes.
The east side of Lexington Avenue is lined with retail and office buildings. West of
Highway 51 is a residential neighborhood.
The Study Area
The 2008 pattern of land use in the study area is illustrated by Figure 3 and the photos on
the subsequent pages. Most of the study area and the majority of the County Road E
frontage are occupied by retail and service businesses. There are also districts of offices
and industry. The industrial area is somewhat of an extension of the industry north of the
railroad tracks. A district of multiple-family housing exists in the southern portion of the
study area, providing somewhat of a transition to the residential neighborhood further
south.
Notable elements of current land use include:
Arden Plaza Shopping Center: a retail, service and office development with access
from Lexington Avenue and County Road E. An application was submitted by the
owner in 2007 to amend the Planned-Unit Development agreement in order to remove
the three office buildings and build a 15,000 square foot pharmacy, a (small) 16,000
square foot retail store and a two-story 14,000 square foot retail and office building
(directly east of the Frattalone’s Hardware store). The application was withdrawn
before being considered by the City Council.
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-5
Figure 3
Existing Land Use, 2008
Current Physical Conditions
2-6 Guiding Plan for the B2 District 20 October
The Former Holiday Inn property: eight acres of land and an unused 150-room hotel
at the corner of County Road E and Lexington Avenue. The building is scheduled to
be used as a residence hall for Northwestern College students through the fall of
2011. Also included are a restaurant and two large banquet rooms.
Northpark Corporate Center: four major office buildings with access from both
County Road E and Pine Tree Drive.
Carroll’s Furniture: a relatively small but locally owned retail furniture business on
the north side of County Road E.
Corporate Express: a major business-to-business office supplies and equipment
company.
Three banks along the south side of County Road E: Anchor, Wells Fargo and TCF.
Flaherty’s Arden Bowl: includes 36 bowling lanes and a restaurant; parking is located
north of Connelly Avenue.
Pot o’ Gold Bingo: a private operation in an aging, former lumber yard building
north of the McDonald’s restaurant along Highway 51 with access from Connelly
Avenue.
Hunter’s Park: two large condominium buildings with access from Pine Tree Drive.
Country Financial: a large corporate office building with private open space to the
north (including pedestrian paths) and the south (including a wetland).
Catholic Aid Association: an attractive office building located at the intersection of
Harriet and Lexington Avenues. Some undeveloped land is included on the northern
end of this site.
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-7
Arden Plaza is a retail, service
and office development along
Lexington Avenue with a
secondary access point on
County Road E.
There are several wetlands in
the study area. The one shown
here separates the retail portion
of Arden Plaza from Lexington
Avenue.
The former Holiday Inn property
occupies 8 acres at the corner of
County Road E and Lexington
Avenue.
The one-story office buildings in
the southwest quadrant of
County Road E and Lexington
Avenue were proposed for
redevelopment in 2007.
The intersection of County Road E
and Lexington operates at a low
Level of Service in the PM peak
hour.
There is typically a landscaped
setback between the County
Road E curb or sidewalk and the
buildings or parking lot of
approximately 15 to 30 feet.
Current Physical Conditions
2-8 Guiding Plan for the B2 District 20 October
There are three banks located
along County Road E.
Corporate Express is a large
office supplies company on the
northern end of the study area
that generates traffic by heavy
trucks.
County Road E has four travel
lanes and a shared center turn
lane.
Bicycling along County Road E is
difficult and dangerous because
there are no striped cycling lanes
nor a wide curb lane.
Sidewalks exist along only
about three-quarters of the
County Road E frontage.
Crossing intersections and
driveways is hazardous because
of the many fast-moving autos
making turns.
Minnesota Highway 51,
sometimes known in this vicinity
as Hamline Avenue or Snelling
Avenue, forms the western
boundary of the study area.
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-9
There is no space on the bridge
over Minnesota Highway 51 for
pedestrians or bicyclists.
The easterly exit from the Arden
Plaza shopping center operates
at Level of Service F during the
PM peak hour.
The Northpark Corporate Center
includes four prominent office
buildings.
A convenience store with fuel
pumps and auto service bays is
located along the south side of
County Road E at Minnesota
Highway 51.
Current Physical Conditions
2-10 Guiding Plan for the B2 District 20 October
A bingo gaming business is
located north of the McDonald’s
restaurant along Connelly
Avenue in a former industrial
building.
Four small industrial buildings
are located to the east or west of
the major Corporate Express
building although none is easily
visible from County Road E.
The Country Financial
headquarters office occupies the
southwest corner of the study
area.
A large open space and paths
surround the Country Financial
office building.
The Hunter’s Park condominiums
are the housing element in the
study area.
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-11
An office building anchors the
southeastern corner of the study
area.
There may be some first-time
development potential remaining
in the study area.
The east side of Lexington
Avenue in the City of Shoreview
includes a retail-office mixed use
building, a convenience gas and
good store, and several office
buildings.
The asphalt path along the
western side of Lexington Avenue
ends abruptly at the eastern
entrance to Arden Plaza.
Current Physical Conditions
2-12 Guiding Plan for the B2 District 20 October
Current Zoning and Land Use Plan
Current Zoning Regulations
The pattern of zoning districts in the study area as of 2008 is illustrated by Figure 5. The
districts are summarized as follows:
B-2, General Business District: Allows as Permitted Uses service businesses,
clinics, non-profit clubs, fitness clubs, commercial recreation, child day care
facilities, financial institutions, hotels, funeral homes, offices, personal service
businesses, and retail sales.
R-4, Multiple Dwelling District: Allows as Permitted Uses single-family
dwellings, two-family dwellings and day care facilities. Allows under the
Planned-Unit procedure attached housing up to a density of twelve dwelling units
per net acre.
Thus, the several industrial businesses north of County Road E are not consistent with the
pattern of zoning or with the 1998 Land Use Plan (see below).
Land Use Plan, 1998
The City of Arden Hills Comprehensive Land Use Plan (1998) guides most of the study
Area for commercial development. High-Density Residential land use is designated for
the Hunter’s Park condominium area.
Land Use Plan, 2008
The City is in the process of updating the 2030 Comprehensive Plan, which can be
amended as needed to reflect the results of this Guiding Plan.
Figure 4
1998 Land Use Plan
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-13
Figure 5
Zoning Districts, 2008
Current Physical Conditions
2-14 Guiding Plan for the B2 District 20 October
Major Natural Features
As illustrated by Figure 2, Study Area, there are at least four major wetlands, all located
south of County Road E, some of which sustain open water.
There is also a large, privately owned wooded area that wraps around the Country
Financial site in the southwest portion of the study area.
Building Design and Conditions
Most of the buildings in the study area have been constructed within the past forty years
and are generally in very good condition. The oldest buildings include the industrial
buildings north of County Road E and the Pot o’ Gold bingo hall (a deteriorated and aged
former industrial structure). The newer buildings tend to be south of County Road E.
Exterior building architecture varies although most structures have facades of masonry
and glass.
The overall impression along County road E is a low-rise, low-density suburban
environment. Many of the commercial buildings have a landscaped front setback with the
parking located to the side or rear, which provides a pleasant appearance for the corridor.
Others have parking between the sidewalk and the building with little or no landscaping.
The most impressive structure is probably the four-story former Holiday Inn hotel that has
been vacant since the fall of 2007. In comparison, the three office buildings immediately
south of County Road E from the hotel are one story in height and six-sided.
Arden Plaza is a community-scale shopping center located in the southwest corner of
Lexington and E that includes the three office buildings mentioned above. The
appearance of the center is well maintained but undistinguished. The center is nicely
buffered from the adjacent housing and offices by a row of mature conifers. Between
Arden Plaza and Lexington Avenue is a landscaped pond, which is attractive but probably
hurts the business visibility of the center and restricts auto access.
The Northpark Corporate Center consists of a pair of one-story brick office buildings with
frontage along County Road E plus two three-story brick office buildings to the south
with primary access from Pine Tree Drive.
The largest building in the study area is probably the warehouse and offices for Corporate
Express, a major vendor of business office supplies, equipment and furniture.
Fortunately, only the office element abuts the County Road E frontage; the warehouse
and truck court are relatively concealed in the rear.
The largest surface parking lot, that of Country Financial, is arranged in an unusual and
interesting semi-circular shape focused on a landscaped arrival and turn-around. The
approach is via a curving, tree-lined two-lane road, and views are softened by mature
woods. Thus, the expanse of parking is not a visual nuisance to the vicinity.
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-15
There is little or no land available for new construction without undergoing
redevelopment. Minor opportunities may include the northern end of the Catholic Aid
Association office property along Lexington Avenue south of the Arden Plaza shopping
center.
Redevelopment opportunities may include the former Holiday Inn property, the office
component of Arden Plaza, and the Pot o’ Gold bingo property.
In 2007, a planned unit development application was presented to the City to remove the
office building from Arden Plaza and build a freestanding pharmacy, a freestanding retail
building and a mixed-use retail and office building (on the southernmost end of the
parking area between the pond and the existing retail center).
South of Harriet Avenue is a residential neighborhood of narrow-lot, single-family homes
with a distinctive 1970s design. This neighborhood includes two wetlands and backs up
to the wooded area owned by Country Financial.
Along the east side of Lexington Avenue in Shoreview, there is a mixed-use retail and
office building north of County Road E. South of E, there is a convenience store and a
series of four attractive office buildings.
West of Highway 51, development consists of an attractive, low-density, wooded
neighborhood of single-family homes.
North of the railroad tracks are large industrial and retail buildings including a Cub Foods
grocery. East of Lexington Avenue is a Super Target (goods plus groceries) store.
Study Area Identification and Identity
The study area lacks a sense of identity, which would be helpful both for business
marketing and to build a sense of central place for the Arden Hills community. There are
no entrances signs, monuments, landscaping or special lighting at the eastern or western
ends to the district announcing arrival or place.
Some people have called the study area “downtown,” but that term has not caught on,
perhaps because it lacks many of the physical characteristics usually associated with a
downtown: a grid of streets, sidewalks lined with buildings, and civic buildings, plaza or
parks.
Another identity shortcoming is the name of the major road. The county road designation
does no evoke warm and local identity. It has been suggested that the Lake Johanna
Boulevard moniker be extended from Old Snelling to Lexington Avenue and possibly
into Shoreview.
Current Physical Conditions
2-16 Guiding Plan for the B2 District 20 October
Road Pattern
The Traffic Analysis and Plan chapter of this document includes a complete and detailed
analysis of current and forecast traffic conditions. However, a few global observations
are offered below.
The basic circulation challenge for the study area is the fact that there are only three ways
in or out of the district: the east and west “ends” of Country Road E at the bridge over
Highway 51 and at Lexington Avenue and Harriet Avenue at Lexington Avenue. No
roads other than Lexington and Highway 51 cross the railroad line to the north, and there
is no link to the south through the adjacent neighborhood.
The capacity of the Highway 51 connection is adequate for the study area because of its
folded diamond interchange design. However, the signalized intersection of E at
Lexington Avenue suffers from peak-hour congestion; the overall level of service is D,
and east-to-northbound PM peak hour left-turns movement operates at level of service F
(the worst rating).
Internally, circulation is hampered by the size of the block bounded by Lexington, E, Pine
Tree and Harriet. The lack of internal public streets to divide that large block reduces the
access options for all land uses. The result is that peak-hour egress at certain driveways
(e.g., the northern exit from Arden Plaza) is difficult and hazardous. Also, County Road
E is forced to serve the dual and conflicting roles of traffic movement and land access.
Ideally, traffic related to Corporate Express would be routed through the industrial area to
the north but that is not possible. The warehouse land use and its truck traffic are
inconsistent with the nature of the rest of the study area.
Street and Right-of-Way Dimensions
County Road E consists of four traffic lanes and a shared center turn lane. Public right-
of-way and street dimensions were measured (rounded to the whole number) at three
points:
1. At the Corporate Express entrance:
ROW: 89’
Street: 72’
2. At Carroll Furniture (just east of Pine Tree Drive):
ROW: 83’
Street: 70’
3. At the eastern median:
ROW: 88’
Street: 72’
Thus, County Road E is typically 72 feet from curb to curb in an 83 to 89 foot right-of-
way and is divided approximately as:
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-17
Number Element Dimensions
4 12-foot driving lanes 48
2 2-foot gutters 4
1 18-foot shared left-turn lane 18
2 Boulevards 13 to 17
(6.5 to 8.5 each)
Current Traffic Conditions
The three major roadways within the study area, all designated as minor arterials, are
County Road E (Ramsey County State Aid Highway 15), Lexington Avenue (Ramsey
County State Aid Highway 51), and Minnesota Trunk Highway 51. The rest of the
roadways within the study area are city streets. Existing traffic control, speed limits, and
travel lanes are shown on Figure 6 for each study intersection. No roadway
improvements are scheduled near the site.
Metro Transit route 225, which is a local circular route, travels along County Road E,
Lexington Avenue north of the study area, and to Rosedale shopping center. Route 261, a
local/express bus, travels along Lexington Avenue through the study area. There are no
major bus stops within the study area, but bus service is available during the day time
hours.
There are intermittent trails and sidewalks for pedestrians through the study area. The
sidewalks along County Road E are interrupted by many driveways that serve the local
businesses. There are bicyclists who use the corridor both on street and along the
trails/sidewalks. The County Road E / Highway 51 interchange provides a significant
barrier for pedestrians and bicycles who want to move along the County Road E corridor.
The bridge over Highway 51 does not have sidewalks or on street bicycle lanes.
Traffic Volumes
In commercial / retail areas, such as the County Road E corridor, the p.m. peak hour is
typically more congested than the a.m. peak period. For this reason, the analysis in this
study focuses on the p.m. peak hour. Figure 7 shows the existing p.m. peak hour turning
movement counts for the study area. The data for the street intersections was collected in
2008 and the turning movement count data is contained in fifteen minute intervals in the
Appendix. The turning movement volume data for the County Road E / Arden Plaza
driveway intersection is from the 2007 Traffic and Parking Study for Proposed
Redevelopment of Arden Plaza. No turning movement volumes are shown for the
Holiday Inn site because it is currently vacant and will be completely redeveloped.
Please note the traffic volumes do not balance between the study intersections because
there are driveways and ancillary intersections between them.
The historic daily traffic volumes for the area roadways are shown in Table 1. This data
was furnished by Mn/DOT.
Current Physical Conditions
2-18 Guiding Plan for the B2 District 20 October
Source: City of
San Jose, CA
Table 1
Average Annual Daily Traffic Volumes
0
5,000
10,000
15,000
20,000
25,000
30,000
Year
Ve
h
i
c
l
e
s
p
e
r
D
a
y
CR E E of Lexington
CR E W of Lexington
Lexington N of CR E
Lexington S of CR E
CR E E of Lexington 6,900 6,400 6,700 7,000 7,900 9,100 10,100 10,500 9,400 9,100
CR E W of Lexington 16,000 15,300 15,700 15,500 15,800 15,800 16,300 16,000 16,000 14,700
Lexington N of CR E 15,700 14,500 17,500 17,000 20,000 19,000 24,000 23,000 22,400 22,400
Lexington S of CR E 13,500 11,500 12,500 12,500 12,000 12,000 14,000 13,000 11,800 13,100
1986 1988 1990 1994 1996 1998 2000 2003 2005 2007
Level of Service
An intersection capacity analysis was conducted for the
existing intersections per the Highway Capacity Manual.
Intersections are assigned a “Level of Service” letter grade for
the peak hour of traffic based on the number of lanes at the
intersection, traffic volumes and traffic control.
Level of Service A (LOS A) represents light traffic flow (free
flow conditions) while Level of Service F (LOS F) represents
heavy traffic flow (over capacity conditions). LOS D is
considered acceptable in urban conditions. The photos on the
left represent some of the LOS grades (from a signal controlled
intersection in San Jose, CA).
The LOS results for the existing study hours are shown in
Table 2. These are based on the existing traffic control and
lane configurations as shown in Figure 6. The existing turning
movement volumes from Figure 7 were used in the LOS
calculations. The LOS calculations were done using
SYNCHROTM software. Ramsey County’s existing timing
plans were used in the analyses. The complete LOS
calculations are included in Appendix A.
LOS F = Unacceptable
LOS A
LOS C
LOS D = Acceptable
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-19
Table 2
Existing Level of Service (LOS)
Intersection Existing P.M.
Peak Hour
Level of Service
Co Rd E & Highway 51 Ave West Ramp B
Co Rd E & Connelly Ave C
Co Rd E & Pine Tree Dr B
Co Rd E & Holiday Inn Site Dvwy A
Co Rd E & Arden Plaza Dvwy A
Co Rd E & Lexington Ave D
Lexington Ave & Harriet Ave A
All of the study intersections operate acceptably at LOS D or better in the existing p.m.
weekday peak hour.
Figure 6
Existing Lanes and Traffic Control
Current Physical Conditions
2-20 Guiding Plan for the B2 District 20 October
Figure 7
Existing PM Peak Hour Traffic Volumes
Figure 8
Existing Daily Traffic Volumes
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-21
Off-Street Parking
Off-street parking is provided for every building in the study area; there is no parking
allowed on County Road E. Parking is allowed on Pine Tree Drive and Harriet Avenue
but rarely used. All parking areas appear to provide adequate capacity for the land uses
that they serve including the more intensive uses such as Arden Plaza, Flaherty’s Arden
Bowl and the Northpark Corporate Center.
Structured parking in the study area is located under the two major Northpark Corporate
Center office buildings.
Pedestrian and Bicyclist Circulation
Pedestrian and bicyclist circulation in the study area is difficult and hazardous.
A concrete sidewalk exists along the south side of County Road E from the Highway 51
off-ramp to Lexington Avenue. On the north side, there is a sidewalk only from the west
leg of Connelly to Pine Tree Drive. Walking along County Road E is an intimidating
experience because of the high speed traffic. Crossing driveways or Pine Tree Drive is
dangerous because of the many turning vehicles.
There are no sidewalks along Pine Tree Drive, Harriet, Lexington or Highway 51. There
is a walking path in the open space owned by Country Financial. There are no designated
pedestrian crossings on County Road E. The only signalized intersections are at the
Highway 51 ramps and at the Lexington Avenue intersection.
There are no on-street striped bicycling lanes or off-street bicycling paths in the study
area.
Crossing the Highway 51 bridge is especially hazardous for pedestrians or bicyclists. The
bridge deck consists of two auto lanes, no sidewalks and no bicycling lanes. County
Road E is five lanes east of the bridge and two lanes west of the bridge.
Crossing Lexington Avenue on foot or bicycle is equally intimidating. There are striped
pedestrian crossings and walk indicators at the signalized Lexington intersection but no
such help at the Arden Plaza driveway nor the Harriet Avenue intersection.
Streetscape Improvements
Along County Road E there are decorative street lights elevated and spaced to illuminate
the road for auto traffic and, secondarily, pedestrian movement. The metal poles and
“shoebox” light fixtures are a step up from the most basic equipment and provide a high
level of illumination and enhance the sense that this is a special district.
There are no trees in any of the public street rights-of-way. Trees along County Road E
would help soften and effect of the wide road and add identity and unity to the corridor.
There is probably insufficient space between the curb and the right-of-way boundary
Current Physical Conditions
2-22 Guiding Plan for the B2 District 20 October
along County Road E for trees; that distance is approximately 7 feet or less in most
locations, as noted above.
Sidewalks are presently located outside the public right-of-way in easements across
private property. Any trees near the street are on private land.
Lexington Avenue presents an unappealing image as an entrance to Arden Hills and the
County Road E study area. It has neither decorative street lights, street trees, continuous
sidewalks nor continuous curbing.
Highway 51 is located below the surrounding grade near the study area and is lined with
mature vegetation that appears to have come up on its own.
Current Physical Conditions
20 October Guiding Plan for the B2 District 2-23
Summary of Major Physical Planning
Issues
The following questions should be discussed, debated and resolved during the planning
process from the County Road E Plan.
1. Arden Plaza: What should be the extent and nature of redevelopment, if any, on
the Arden Plaza shopping center site? Should additional development on that site
be limited for the sake of traffic operations at its two driveways?
2. Former Holiday Inn Site: How should the former Holiday Inn property be
used in the future?
3. Industry: Is industry considered an appropriate land use along the County Road E
corridor?
4. Street Trees: Should the City plant trees along the County Road E right-of-way?
Should pedestrian-scale lighting be installed?
5. Lexington Avenue Streetscape: Should the City invest in trees, decorative
lighting and better sidewalks along Lexington Avenue?
6. Entrance Monuments: Should district identity signage, lighting and/or
landscaping be installed at the Lexington and Highway 51 entrances to the study
area?
7. Building Setbacks: Where should future buildings be located relative to the
street and sidewalk – set immediately adjacent to the sidewalk, set back a short
distance or separated with a parking area?
8. Design Guidelines: Should the City adopt and apply a set of site planning and
architectural design guidelines in the corridor?
9. Role of the City: To what extent should the City of Arden Hills be involved in
helping to implement changes in the study area? Should the City’s role be limited
to planning, zoning and public infrastructure or should it become financially
involved in site redevelopment?
20 October Guiding Plan for the B2 District 3-1
District Market Analysis
Maxfield Research, Inc., was retained by the City of Arden Hills to conduct market
research and analysis of the market potential for an area in Arden Hills considered to be
the prime central business district of the city.
The scope of this study includes an evaluation of the site; definition of an appropriate
draw area (“Market Area”) for general occupancy and seniors housing, retail business
and office land uses; an examination of demographic growth trends and characteristics of
the Market Area; and an analysis of competitive housing, retail and office developments
in the Market Area. Based on the research, demand is projected for general occupancy
and senior housing units, retail, and office space in the study area.
Based on this analysis, it was found that the study area could support selected housing
products and additional commercial retail space. At this time, sufficient demand was not
found to support additional office space.
The report contained primary and secondary research. Primary research included
interviews with realtors, commercial brokers, City Staff and others. All of the market
data on existing and pending developments was collected by Maxfield Research, Inc.,
and is accurate to the best of their knowledge. Secondary data, such as U.S. Census data,
is credited to the source and is used as a basis for analysis.
Housing Conclusions and Recommendations
Over time, a maximum of 778 housing units that could be supported in the General
Occupancy and Senior Market Areas from 2008 to 2020. The number of supportable
units should be revisited prior to any redevelopment in the study area to determine
whether sites that become available for redevelopment would justify accommodating
additional housing stock. Total demand by type of housing is summarized in the table
below.
The table below represents optimal demand for housing in the study area. However,
based upon the timing and costs of redeveloping specific sites, the full potential may not
be realized. Additionally, these demand figures are based on the assumption that the
TCAAP site would move forward with development as planned. If the TCAAP site does
not add as many units as planned, the study area could potentially capture a greater
proportion of demand for each of the specified product types if appropriate sites were
made available to accommodate housing in the study area.
District Market Analysis
3-2 Guiding Plan for the B2 District 20 October
A summary of demand calculations for general occupancy rental housing and senior
housing in the study are described further in the following sections.
General Occupancy Demand
Sufficient demand was found to support a total of 228 market rate and 183 affordable
units of general occupancy rental housing in the study area. It was felt that the study area
could support a stand-alone market rate building if an appropriate site becomes available
for development. However, a 100 percent affordable building is not recommended as
rents would not make project development costs financially feasible. Rather, it is
suggested that any general occupancy rental project include a mix of market rate and
affordable units in a medium- to high-density building (for example, 80 percent market
rate units and 20 percent affordable units) as the market rate rents would help support
high land acquisition and development costs.
Senior Housing Demand
There is sufficient demand to support 389 adult units, 620 ownership units, 340
congregate units, 202 assisted living units, and 185 memory care units. It is
recommended that any new construction of senior housing in the study area be done as a
combination of senior housing types in the form of a senior campus as the only senior
housing types that could support a stand-alone buildings would be independent senior
housing.
Furthermore, senior housing in the study area could be affected by additional product
added at TCAAP or other location in the Market Area. Any future development of senior
housing in the study area should revisit Market Area conditions in order to find sufficient
demand to support additional product in the Market Area.
Condominium and Townhouse Demand
Based on findings in the TCAAP study, the study found a total potential demand for
about 100 units of condominium housing, all of which would be captured on the TCAAP
site. If the estimated potential demand for the 100 condominium units is unmet at the
TCAAP site, there would be an opportunity for a redevelopment site in the study area to
capture a portion of the unmet demand.
Additionally, it is recommended that townhouses be developed in the study area. Any
future redevelopment site in the study area would likely be unable to support the higher
density required to support an affordable townhouse product in this marketplace.
District Market Analysis
20 October Guiding Plan for the B2 District 3-3
Projected Demand for Neighborhood and Specialty
Retail Space
Table 4 calculates the amount of neighborhood retail space and Table 5 calculates the
amount of specialty retail space (gross leasable area in square feet) supportable within the
draw area from household growth alone.
The figures used for the calculations reflect the amount of money spent on consumer
goods and services (from consumer expenditure reports from Claritas, Inc.) and the
estimated median sales per square foot for neighborhood retail centers (from Dollars and
Cents of Shopping Centers, Urban Land Institute).
Also shown in the table is a calculation for “net leakage.” Net leakage is the amount of
consumer spending for convenience goods and services that is likely to be spent outside
of the Retail Market Area. This calculation is based on the proportion of consumer
expenditures that can be captured by retail space in the area. We estimate that retail
space in the Retail Market Area is currently capturing about 80 percent of the total
neighborhood retail expenditures and 60 percent of specialty retail expenditures by
residents. The net leakage figures in the demand tables are based on the estimated
leakage after new space would be added in the Retail Market Area. Based on the goods
currently offered in the Retail Market Area, it is estimated that leakage would gradually
decrease if new space were added.
Percent Estimated Potential
Capturable Demand for Units
in study area in study area**
General Occupancy Rental Housing
Market Rate Apartments 20%228
Affordable Apartments 20%183
Total 411
Senior Housing
Adult Rental 20%78
Adult Ownership 20%124
Congregate 20%68
Assisted Living 25%51
Memory Care 25%46
Total 367
Total Units 778
Source: Maxfield Research, Inc.
* Figures shown are the total number of units that could be supported in the study area. Figures
assume that the TCAAP site will be developed as planned.
**If TCAAP does not develop as many units as planned, then the study area could potentially capture a
greater percentage of the excess demand.
185
1,736
SUMMARY OF HOUSING DEMAND IN THE STUDY AREA*
2008 to 2020
TABLE 3
Demand for Units
in Mkt Area
1,140
917
202
340
Total Excess
2,057
389
620
District Market Analysis
3-4 Guiding Plan for the B2 District 20 October
Table 4 calculates demand for neighborhood retail space in the Retail Market Area. The
following bullet points summarize the demand calculations presented in Table 4.
There were approximately 31,600 households in the total Retail Market Area in 2007.
Added are the number of employees estimated to work in the Retail Market Area.
There are approximately 21,100 non-resident households, or employees, working in
the Retail Market Area.
Based on the analysis of consumer expenditure data, it is estimated that consumer
expenditures for the types of neighborhood goods and services that could be
purchased in the Retail Market Area are $26,452 per household.
Multiplying the consumer expenditure figure by the number of households and
employees results in total retail sales of $1.4 billion. However, factoring in leakage
of retail dollars spent by Retail Market Area residents to centers outside of the Retail
Market Area at 80 percent, the total demand in the Retail Market Area is reduced to
$1.1 billion. (Leakage could potentially decline if particular types of retail were
added in Arden Hills.)
2007 2012
Market Area Purchasing Power
Market Area Households 31,358 32,191
Market Area Employees 2 +21,093 22,477
(times) Annual Neighborhood Household Expenditures x $26,452 $31,660
(equals) Total Market Area Expenditures =$1,387,424,382 $1,730,800,151
(plus) Approx. % Leakage Outside the Market Area1 20% 20%
(equals) Leakage Outside of Market Area $277,484,876 $346,160,030
(equals) Total Purchasing Power $1,109,939,506 $1,384,640,121
(divided by) Average sales per Sq. Ft. 3 /$234 $258
(equals) Total Retail Space Demand (Sq. Ft.)= 4,741,508 5,357,389
Retail Demand Potential
Retail Space Demand Growth
(times) Amount Capturable by the study area x5% - 10%
Demand for Additional Neighborhood Retail Space in Arden Hills (in sq. ft.)30,794 - 61,588
2 We estimate that approximately of 1/3 of Market Area employees make purchases in Market Area.
3 From Dollars and Cents of Shopping Centers, Urban Land Institute.
Sources: Claritas;
Dollars and Cents of Shopping Centers, Urban Land Institute;
Maxfield Research Inc.
1 This Positive Leakage Factor is the estimated percentage of consumer expenditures spent by Market Area households
consuming goods and services outside of the Market Area.
2007 to 2012
615,882
TABLE 4
DEMAND FOR NEIGHBORHOOD RETAIL SPACE
ARDEN HILLS MARKET AREA
2005 to 2015
District Market Analysis
20 October Guiding Plan for the B2 District 3-5
Utilizing average sales per square foot from Dollars and Cents of Shopping Centers
and adjusted to account for location factors by Maxfield Research, it was determined
that the Retail Market Area demand was about 4.7 million square feet in 2006,
increasing to about 5.4 million square feet in 2012.
No one site can capture 100 percent of the demand as the subject site will compete
with other areas in the Retail Market Area for new retail stores over this period. We
estimate that the study area would be able capture 5 percent to 10 percent of the
neighborhood retail demand, or about 30,800 to 61,600 square feet between 2007
and 2012.
Using the same methodology as above to calculate demand for specialty retail space
in Table 5, it was estimated that the study area would be able capture 5 percent to
10 percent of the specialty retail demand, or about 9,300 to 18,500 square feet
between 2007 and 2012.
If Arden Plaza remains in its current state, we feel that the study area would capture
demand for neighborhood and specialty retail space at the 5 percent levels shown in
Tables 2 and 3. However, if Arden Plaza is repositioned or renovated in the future,
demand could reach the 10 percent levels as shown in the illustrated demand tables.
TABLE 5
DEMAND FOR SPECIALTY RETAIL SPACE
ARDEN HILLS MARKET AREA
2007 to 2012
2007 2012
Market Area Purchasing Power
Market Area Households 31,358 32,191
Market Area Employees1 +21,093 22,477
(times) Annual Specialty Household Expenditures x $12,658 $14,869
(equals) Total Market Area Expenditures =$663,920,226 $812,863,785
(plus) Approx. % Leakage Outside the Market Area2 40% 40%
(equals) Leakage Outside of Market Area $265,568,091 $325,145,514
(equals) Total Purchasing Power $398,352,136 $487,718,271
(divided by) Average sales per Sq. Ft. 3 /$234 $258
(equals) Total Retail Space Demand (Sq. Ft.)=1,701,705 1,887,058
Retail Demand Potential
Retail Space Demand Growth
(times) Amount Capturable in study area x 5% - 10%
Demand for Additional Specialty Retail Space in study area (in sq. ft.)9,268 - 18,535
1 This Positive Leakage Factor is the estimated percentage of consumer
2We estimate that approximately of 1/3 of Market Area employees make purchases in Market Area.
3 From Dollars and Cents of Shopping Centers, Urban Land Institute.
Sources: Claritas;
Dollars and Cents of Shopping Centers, Urban Land Institute;
Maxfield Research Inc.
2007 to 2012
185,353
District Market Analysis
3-6 Guiding Plan for the B2 District 20 October
Appropriate Types of Retail
As seen in our projected demand tables, those retailers attracted to the study area will
most likely be neighborhood retailers. Types of retail that would be appropriate for
the study area are listed in Table 6 along with the median size (square feet) for each
type of store. The store types represent stores with the greatest potential to locate in
the study area. It should be noted, however, that the study area is not likely to attract
all of these potential retailers. Some retailers may choose not to locate in the study
area because of competing stores that may be developed in nearby Retail Market
Area shopping centers or storefronts or because similar retailers that already exist in
the study area.
Retail Lease Rates
Based on the lease rates at new competitive shopping centers in the Market Area and
surrounding communities, we find that retail space in the study area should be priced
lower than higher-profile sites closer to the commercial district north of the study
area and near Rosedale Center. With the right mix of retailers and a reconfiguration
of the property, we believe Arden Plaza could increase lease rates to about $17.00 per
square foot.
Redevelopment of existing commercial properties such as Arden Plaza may require a
public/private partnership. The rents necessary to make redevelopment feasible
would be higher than what potential retail and office tenants could or would be
willing to pay initially. Public assistance to help reduce the cost of redevelopment to
the private sector could be necessary for the commercial portion of the redevelopment
to be successful in the next five years.
District Market Analysis
20 October Guiding Plan for the B2 District 3-7
Median Median
Retail Uses: Sq. Ft.Retail Uses:Sq. Ft.
Cards & Gifts 2,400 Arts & Crafts 2,200
Coffee/Tea 1,250 Book Store 4,400
Convenience Market 3,000 Computer/Software 1,250
Deli/Specialty food 1,950 Decorative accessories 1,650
Drugstore/Pharmacy 12,150 Discount Dept Store 12,000-15,000
Dry Cleaner/Laundry 1,450 Eyeglasses-Optician 1,400
Fast Food Restaurant 3,000 Flowers/Plant 1,200
Ice Cream Shop 1,200 Furniture Store 5,000
Liquor/Wine 2,400 Health Club 10,000
Nail Salon 1,050 Hobby 2,500
Photocopy/Fast Print 1,400 Home accessories 2,800
Pizza 1,500 Mailing/Packaging 1,200
Restaurant with liquor 4,000 Pet Shop 2,000
Sandwich Shop 1,250 Photographer 1,200
Sporting Goods 3,090 Picture Framing 1,250
Tailor 900 Radio, Video, Stereo 2,100
Tanning Salon 1,250
Telephone/Telecom 1,020
Unisex hair 1,300
Weight Loss Center 1,300
Sources: Urban Land Institute: Dollars and Cents of Shopping Centers, 2006
Maxfield Research Inc.
*Examples may overlap with existing uses; this table is intended to represent potential
retailers (type and size) that could locate in the study area.
Neighborhood-Oriented Specialty Retail
TABLE 6
EXAMPLES OF POTENTIAL RETAILERS FOR THE STUDY AREA*
June 2008
RETAIL USES BY MEDIAN SIZE OF STORE
District Market Analysis
3-8 Guiding Plan for the B2 District 20 October
Projected Demand for Office Space
The amount (in square feet) of additional office space supportable in the study area is
based on projected office employment growth in the Office Market Area. The demand
calculations are shown in Table 7 and are summarized in the following points.
The Office Market Area is projected to add nearly 6,000 total jobs between 2007 and
2015. Of that growth, it is estimated estimate that 30 percent will be office jobs, or
1,776 new office jobs.
Using an industry standard of 200 square feet of office space per employee on
average, demand is forecast for 355,131 square feet of office space in the Office
Market Area between 2007 and 2015 to accommodate office employment growth.
This figure assumes that a variety of office spaces in a variety of locations will be
available to meet the needs of prospective tenants.
Of this demand, we estimate that Arden Hills will capture 30 percent or 106,539
square feet of office space.
From that amount, existing competitive space marketing was subtracted along with
pending space identified – about 120,076 square feet. From that calculation, demand
was estimated for about -13,537 square feet of office in the City of Arden Hills
between 2007 and 2015. The negative demand for office space is the result of large
amounts of vacant office space located in the Arden Hills Office Market Area.
At this time, our findings suggest that no new office space could be supported in
the study area. We estimate negative demand (-2,031 to -2,707 square feet of
office space) from 2007 to 2015 in the study area due to existing vacant office
space as well as the Office Market Area’s limited capacity to absorb existing product.
If the Office Market Area’s vacancy rates decline and the marketplace absorbs
existing office space in the future, there is potential for a redevelopment site to
potentially capture an office user considering locating in the study area. However,
we believe that a minimum of five to seven years will be required to allow for the
market to rebound and absorb existing product.
Small technology firms, consulting companies, legal firms, medical offices, small
sales firms, and advertising firms are some of the companies that might be interested
in locating in the study area. Other companies specializing in medical products or
technology may also consider office space in the study area to synergize with
similarly focused companies located nearby.
District Market Analysis
20 October Guiding Plan for the B2 District 3-9
Demand from Projected Employment Growth
Projected increase in employment in the Arden Hills Market Area, 2007 to 2015 new jobs
(times) Percentage of projected employment growth that will be office jobs x
(equals) Projected increase of office jobs in the Market Area, 2007 to 2015 =new office
(times) 200 square feet of office space per employee x sq. ft./emp.
(equals) Total Market Area office space demand from growth, 2007 to 2015 =
(times) Percent capturable in the study area x
(equals) Projected office demand in 2007 to 2015 =
(minus) Available and planned competitive leasable office space in 2007*-sq. ft.
(equals) Projected demand for small business office space in Market Area =sq. ft.
(times) Estimated capture rate in the study area x 15%- 20%
(equals) Estimated total new office space supportable in the study area.=-2,031 - -2,707 sq. ft.
*Estimated % of Market Area office space that would be competitive with the study area:
New Brighton -10%; Roseville-25%; Shoreview-50%; Arden Hills-100%
Source: Maxfield Research Inc.
TABLE 7
PROJECTED DEMAND FOR OFFICE SPACE
ARDEN HILLS MARKET AREA
2007 to 2015
5,919
200
30%
106,539
1,776
355,131
30%
120,076
-13,537
30 October Guiding Plan for the B2 District 4-1
Land Use and Public Improvements Plan
Guiding Principles
These principles will be used by the City of Arden Hills to help guide the evolution of the
B2 District including plans for land use, urban design, public facilities and circulation.
Elaboration and details will be added as the plan progresses.
1. Place
Create a visual impression that the B2 district is a distinct, identifiable and special
place in Arden Hills.
2. Land Uses
Allow and encourage a variety of land uses in the district potentially including retail
and service businesses, offices, high-density housing, places to eat and drink,
industry that has high employment density and attractive buildings, education and
indoor recreation.
3. Intensity and Scale
As redevelopment occurs, generally increase the height of the buildings and amount
of each site they cover.
4. Local
Create a district that serves the needs and desires of residents of Arden Hills.
5. Quality
Ensure that all private and public improvements are of a high quality in terms of
appearance, function and longevity.
Land Use and Public Improvements Plan
4-2 Guiding Plan for the B2 District 30 October
6. Civic
Communicate that the district is “everybody’s neighborhood” and a center of public
life in Arden Hills (a distinction perhaps to be shared with the redeveloped TCAAP
site) through the use of public plazas or open space, small private spaces usable by
the public, improved sidewalks and streetscape.
7. Movement
Provide for safe and efficient auto movement as land use intensifies but also greatly
improve the environment for pedestrians and bicyclists.
8. Green
Provide year-‘round greenery and color throughout the district through generous
landscaping of private sites and the public street edges. Add one or more green
gathering spaces in the corridor. Improve the public’s use of the Country Insurance
woods, its intended purpose.
9. Role of the City
Establish the primary role of the City in the district as planning, leadership, zoning
and public improvements. Do not rule out the application of municipal financial
assistance in land redevelopment.
10. Continuity
Maintain long-term support for the principles and policies of the Guiding Plan for
the B2 District throughout the entire Arden Hills family including elected and
appointed officials and staff.
11. Environmental Conservation and Sustainability
Promote the use of green building practices, sustainability, and energy conservation
to reduce the environmental impact of new development and redevelopment.
Land Use and Public Improvements Plan
30 October Guiding Plan for the B2 District 4-3
Land Use and Public Improvements
Guidelines for the future use of property in the B2 District are presented by the following
text and Figure 9.
Arden Plaza Site
Northern Access: Plan to create a new access driveway aligned north-south along
the western edge of the Arden Plaza and “TCF Bank” sites to serve both those
properties plus the Northpark Corporate Center site. A connection back to Lexington
Avenue at the southern edge of the Arden Plaza site is optional and should be studied
further.
During the course of this planning process, study and recommend future traffic
controls for that intersection, including whether the northern access drive should be
restricted to right-in, right-out movement. Any new development that occurs before
the new road is built should be designed to fit within a long-term guiding plan that
makes use of the new access drive.
Eastern Access: Preliminarily determine during this planning process whether the
eastern access drive to this site should be restricted to right-in, right-out movement.
An east-west driveway between the proposed new access road and Lexington Avenue
should divide the site between the commercial area and the residential area.
Land Use: Redevelop the current Arden Plaza property long-term with retail and
service businesses on the northern half and either retail businesses, an office building
or an apartment building on the southern half.
Access: Work with Ramsey County to install a traffic signal on County Road E
approximately 550 feet west of Lexington Avenue along with protected left-turn lanes
in a landscaped median. That signal would serve Arden Plaza and the former Holiday
Inn site. This would necessitate realigning the northern access driveway for Arden
Plaza to the northwestern corner of the “TCF Bank” property, which would require
redevelopment of that property.
Gathering Space: Create an attractive civic (but privately owned) gathering
space in the northeast corner of the site, potentially including a small pond or other
water feature.
Building Orientation: Orient the northern commercial buildings to frame the
civic gathering space feature create an attractive and inviting space. These layout
options are preliminarily suggested to accomplish this space-making:
o An east-west layout of two parallel sets of buildings around a “Main Street”
or landscaped median feature leading to the green gathering space in the
northeastern corner of the site.
o An L-shape with the open side facing northeast; sidewalks and a single row of
parking would front the buildings on the sides facing the gathering space; the
major parking would be on the opposite sides of the buildings; the buildings
Land Use and Public Improvements Plan
4-4 Guiding Plan for the B2 District 30 October
would be broken at the point of the L to provide pedestrian movement and
visibility.
o An L-shape with the open side facing southwest; the buildings would be
broken at the point of the L to provide pedestrian movement and visibility.
o An east-west orientation of one building (possibly two or more tenant spaces)
along County Road E and a north-south orientation of a retail building along
Lexington Avenue.
Anchor Business: Redevelop an anchor retail or service building of
approximately 15,000 to 25,000 square feet, preferably on the northern edge of the
site. Consider adding one or more strong national retailers to increase customers to
the site.
Hospitality Businesses: Include in the new commercial area one or more eating
and drinking businesses that could take advantage of and animate the outdoor
gathering space. Restaurants that do well at lunch are expected to be most successful.
Pedestrian Movement: Provide a pedestrian connection from Arden Plaza to
a location near the County Road E and Lexington Avenue intersection. Require the
replacement of the pathway along Lexington Avenue and extend the pathway to the
south for future connections. Also investigate with the owners of the Northpark
Corporate Park the feasibility of creating a pedestrian link from the Arden Plaza site
to the central water feature in the Northpark site and the Country Insurance open
space.
Former Holiday Inn Site
Interim Use: Assume that the current building is demolished after its use as a
college residence hall.
Access: Align a new access drive at the new intersection shown on Figure 9,
opposite the future access point to the south.
Land Use: Redevelop the site with an intensive combination of office, residential
and, possibly, retail or service business land uses. Consider structured parking
located along the railroad tracks. Allow housing and housing or offices above retail
or service businesses. Seniors’ housing would also be a possibility, depending on
market conditions.
Focal Feature: Orient the development around a major landscaped median or
other green space.
Building Relationship to the Street: Locate the buildings close to County
Road E; parking should be to the north of the buildings.
Corner Gateway Feature: Create a green entry feature near Lexington
Avenue.
Land Use and Public Improvements Plan
30 October Guiding Plan for the B2 District 4-5
Figure 9
Land Use Plan
Land Use and Public Improvements Plan
4-6 Guiding Plan for the B2 District 30 October
Industrial Area
Site Assembly: Seek to redevelop this entire area as a whole when the market
allows. The area is defined as including Corporate Express plus the small industrial
buildings to the east and west plus the veterinary and furniture business buildings.
The site may be redeveloped for a single large user or divided into two, three or four
smaller sites. The site could even be assembled, planned and redeveloped in
combination with the Pot o’ Gold and Arden Bowl parking properties.
Access: Create an access point at the Pine Tree Drive signalized intersection.
Land Use: Develop the site intensively with any combination of office, high-
density residential, service business, employment-based (e.g., research and
development), educational or institutional uses. Buildings should be taller than a
single story and may be as tall as allowed by the City’s fire department and can be
accommodated by the roads.
Circulation: Build east-west movement across the site between the Holiday Inn
parcel and Connelly Drive to provide multiple points of access for all properties on
the north side of County Road E and to promote movement among the sites (e.g.,
going to lunch). This circulation may be private lanes among the parking areas.
Building Relationship to the Street: Locate buildings relatively close to
County Road E with a short landscaped setback. Parking should not be located along
County Road E.
Focal Feature: Orient the development around a major landscaped median or
other green space.
Streetscape: Extend the planned streetscape improvements along County Road
E.
Pot o’ Gold Bingo Site
Land Use: This site should be redeveloped for a single, employment-oriented
user that desires some visibility from MN Highway 51 but does not need much
visibility from County Road E.
Country Financial Open Space
Access to Open Space: Work with Country Financial to make the entrance to
these walking paths more visible and welcoming to the public.
Land Use and Public Improvements Plan
30 October Guiding Plan for the B2 District 4-7
Traffic and Streetscape Improvements
Various street segments in and near the district should receive differing treatments in
plantings, lighting, furniture and banners, as follows:
County Road E
From the west side of the Minnesota Highway 51 bridge to at least Lexington Avenue,
this road should receive the highest level of streetscape improvements. Elements should
include:
Boulevard trees spaced at an average of 40 feet.
A planted median that may include trees, shrubs, tall grasses and annual
flowers.
Decorative lighting at the automobile scale (on the existing bases, located
200 feet apart, contemporary styling); optional extra: decorative lighting
at the pedestrian scale located approximately 50 to 70 feet apart)
Benches and trash receptacles.
A pair of new continuous concrete sidewalks (6 feet wide) with
connections to adjacent businesses.
Bollards.
Annual flowers (in beds or raised planters).
Seasonal banners on the light poles.
Striped or colored pedestrian crossings.
Bus waiting shelters.
A traffic signal system at the future intersection located between
Pine Tree Drive and Lexington Avenue.
Replacement signals, arms and poles for the existing signal systems at (all
optional): the eastern ramp terminals of Highway 51, Pine Tree Drive and
Lexington Avenue.
Relocating the electrical boxes to a less visible location or screening
where feasible.
A pedestrian and bicyclist connection over Highway 51, which may be a
separate bridge, a new bridge, or an addition to the existing bridge.
Figure 10 Streetscape Cross Section
The two “end caps” and the Pine Tree Drive
intersection “centerpiece” should be accentuated
by color, intensity, lighting and signage.
Improvements should include irrigation for the
boulevards and the median plus electrical outlets
for winter lighting. Light fixtures should have
“cut-offs” to concentrate the beam and reduce
glare.
Ideally, this streetscape improvement should be carried a short distance into Shoreview
so as to make a smooth transition with the changing nature of the road and land use as
well as to emphasize the intersection as an important landmark or node.
Left-Turns only at Signalized Intersections: Importantly, this improvement
program calls for building a raised, landscaped median that would eliminate left-turn
movements except at the signalized intersections at the Highway 51 ramps, Pine Tree
Drive, a planned new intersection between Pine Tree Drive and Lexington Avenue, and
Lexington Avenue. Additional engineering, traffic study, and review may be needed
prior to implementation.
Street trees with new buildings brought close to a new Lake Johanna Boulevard should be
used to create attractive spaces for pedestrians and a stronger community connection to the
corridor.
Land Use and Public Improvements Plan
30 October Guiding Plan for the B2 District 4-9
Add a supplementary name to County Road E in Arden Hills: Lake Johanna
Boulevard, which is the local name used on County Road 149 west of Minnesota
Highway 51. This additional name will help identify the road as a local facility with a
connection to a nearby natural feature and thereby personalize it. The County Road E
name could still be used by residents and businesses where needed.
Pine Tree Drive and Harriet Avenue
The streetscape elements of County Road E should be carried south on Pine Tree Drive to
the Hunters Park entrance but at a reduced level. This approach would help unify the
district but indicate the secondary nature of Pine Tree Drive. The residential nature of
Harriet Avenue should be protected with the addition of street trees and a sidewalk on
one side of the street.
Lexington Avenue
A comprehensive streetscape improvement program should be undertaken for Lexington
Avenue from north of I-694 to some point south of the district. Request that Ramsey
County install sidewalks, curbing, trees and more attractive lighting along Lexington
Avenue from I-694 to some point south of the study area.
Cooperation from the City of Shoreview and Ramsey County will be essential. The
design objective in this corridor should be tuned to the higher speed and volume of auto
traffic, the large parking areas along the road and the large-scale retail business
environment.
Minnesota Highway 51 and Bridge
This state highway already has a degree of landscaping on its valley slopes. Emphasis
here should be on announcing access to the County Road E district and the Lake Johanna
parks.
Ramsey County should be encouraged to rebuild the bridge over Minnesota Highway 51
with accommodations for pedestrians and bicyclists as soon as possible. Alternatively, a
separate bridge or an addition to the existing bridge should be built for non-motorized
traffic.
Land Use and Public Improvements Plan
4-10 Guiding Plan for the B2 District 30 October
Illustrative Guiding Plan
Several of the principles conveyed in this land use plan and the district design guidelines
have been expressed in the Illustrative Guiding Plan, Figure 11, on the next page. That
sketch is meant to illustrate one possible way in which this plan might be realized but is
certainly not the only development pattern. The market may propose a wide variety of
additional building patterns that are just as desirable (if not more so) and which are also
consistent with this plan and the City’s zoning regulations. The major ideas illustrated by
the Illustrative Guiding Plan are:
Mixture of Land Uses: There should be a mixture of land uses along County
Road E including retail and service businesses that serve the local market, high-
density housing (general market or seniors, rental or owned), and corporate or
professional offices. Some of these activities may be combined on the same site or in
the same building. Overall, land would be intensively used.
Redevelopment Opportunities: There are several major redevelopment
opportunities available over the next 25 years: the former Holiday Inn site, Arden
Plaza and the adjacent “TCF Bank” site, the Pot o’ Gold Bingo property, and the
several industrial and commercial properties in the middle of the corridor.
Building Relationship to the Street: Buildings should be located along
County Road E with parking to the rear. There should be no parking between future
buildings and any public street.
Parking: Parking may be accommodated in well-landscaped surface lots and/or in
attractive structures.
Improvements to County Road E: County Road E should be reconstructed
to include a landscaped median, boulevard trees, protected left-turn lanes, bicycling
lanes and continuous concrete sidewalks.
Traffic Signal: A new traffic signal should be installed between Lexington
Avenue and Pine Tree Drive to serve the former Holiday Inn property and the
enlarged and redeveloped Arden Plaza site. Shared access between the Arden Plaza
site and the adjacent office park to the new traffic signal should be reviewed.
Private Site Landscaping: Each new development should be attractively
landscaped.
Entry Feature: There should be entry feature landscaping, lighting and public art
at the eastern and western ends of the corridor.
Bicyclist and Pedestrian Connection: A bicyclist and pedestrian bridge
should be built over Minnesota Highway 51 or accommodations should be made for
non-motorized traffic when the auto bridge is rebuilt.
Land Use and Public Improvements Plan
30 October Guiding Plan for the B2 District 4-11
Civic Focal Point: A public or private green should be created north of County
Road E.
Figure 11
Illustrative Guiding Plan Refer to Figures 1 or 2 on pages 2-2 and 2-3 to
see the pattern of buildings existing in 2008.
30 October Guiding Plan for the B2 District 5-1
District Design Guidelines
The design guidelines for the B2 District are organized according to the
Guiding Principles of this plan. These statements are intended to be a
guide for the City, developer, architect and builder that allow flexibility,
individuality and creativity.
They focus on fundamental site planning and design ideas that address
compatibility, visual appeal, lasting value and place-making. They
emphasize the relationship to the street, density, heights, façade
treatment, circulation, parking and plantings.
While some of these design guidelines are discretionary and advisory,
some of them may be used to amend the B-2 zoning district to achieve
the long term redevelopment vision within this plan. Ideas for
streetscape enhancements should be considered when the City prepares a
more detailed public improvements plan, though certain improvements
could be implemented by the private sector as properties redevelopment.
Vision Statement
The County Road E / Lake Johanna Boulevard District will be a place
where people can live, work and play.
The district will be a compact, architecturally diverse, pedestrian-friendly
community with a distinct identity.
It will provide sidewalks and places for people to gather and socialize.
Design guidelines will be followed to promote an attractive environment
with lasting value.
The district is dedicated to the belief that we desire to integrate nature,
home, work and leisure.
District Design Guidelines
5-2 Guiding Plan for the B2 District 20 October
Planning and Design Principles
The following principles are the basis for the design guidelines, reflect
the community vision and will be followed through the evolution of the
district.
1. Be more urban than suburban in terms of density, building height,
parking and façade treatments.
2. Include several types of land uses such as office, housing, retail or
service businesses and, possibly, job-intensive light industry.
3. Face residential, office and retail buildings toward the public street to
the extent possible.
4. Insist on a high quality of design in buildings and public
improvements.
5. For office or residential buildings, strive to locate as much of the
parking as possible in structures, under buildings or to the rear of
buildings. For commercial sites, strive to locate at least some of the
building(s) between the street and the surface parking area.
6. Provide a generous amount of landscaping; pay attention to the
details of lighting, signage, materials and fixtures.
7. Encourage walking and bicycling through physical improvements,
streetscape and building placement.
District Design Guidelines
20 October Guiding Plan for the B2 District 5-3
Place
Entrances
The eastern and western entrances to the district should be announced by
special landscaping, signs, lighting and/or art. Those entrance locations
are defined as (west) the immediate vicinity of the eastern Minnesota
Highway 51 ramps and (east) the Lexington Avenue intersection with
County Road E.
Arrival
The vicinity of the intersection of County Road E and Pine Tree Drive
should be demarcated as the visual center of the district through use of
landscaping and lighting.
Street Name
West of Lexington Avenue, County Road E should receive the
supplementary name of Lake Johanna Boulevard, which could be used in
addition to the County Road E name. The City of Shoreview should be
encouraged to also apply this local moniker to County Road E from
Lexington Avenue to Victoria Street.
Space Defined
To the extent possible, locate future buildings so as to define some
spaces in which people feel comfortable walking or sitting. Orient doors
and windows toward those spaces. Avoid locating buildings in a field of
parking. Whenever feasible, require that windows on the first floor of a
building be made of transparent glass.
District Design Guidelines
5-4 Guiding Plan for the B2 District 20 October
Street Improvements
County Road E / Lake Johanna Boulevard should be improved as follows
to create a sense that this is a special place in Arden Hills:
Convert the shared left-turn lane to a landscaped median with
protected left-turn lanes.
Add a row of trees along both sides of the road between the curb and
the sidewalk.
Replace the street light poles and light with new equipment.
Refer also to the description in Chapter 4, Land Use and Public
Improvements, in this guiding plan.
Business Signs
Business signs should be restrained and in proportion with the wall of the
building. Back-lit signs with individual letters are preferred over plastic
panels. Freestanding signs along the public street should be monument
style rather than pole style.
District Design Guidelines
20 October Guiding Plan for the B2 District 5-5
Land Uses
Types of Land Use
Allow a wide range of land use types throughout the district on each site
and, potentially, within each building.
On sites bordering County Road E, allowable land use may include
corporate or professional office buildings, build-to-suit offices, medical
offices, multiple-family housing, lodging, eating and drinking
businesses, and retail or service businesses.
Multiple-family housing would be medium- to high-density buildings
with interior hallways as opposed to townhouses; either rental or owned;
general market or seniors.
Retail or service businesses should be scaled to serve the local trade area
that includes Arden Hills, Shoreview and northern Roseville.
On sites presently occupied by industry along the north side of County
Road E, redevelopment may include certain industrial operations that
have a high density of jobs, no outdoor storage and little or no heavy-
truck traffic.
Every land use should be of the type that generates property tax revenue.
District Design Guidelines
5-6 Guiding Plan for the B2 District 20 October
Development characteristics that will be used to create a sense of place and interest along the new
Lake Johanna Boulevard include mixed use, intensive development, enhanced public spaces framed
by buildings, and architectural fenestration.
(Please also refer to the Illustrative Guiding Plan sketch on page 4-11, which more clearly indicates
the shape, coverage and relationships of the buildings and open space suggested above.)
District Design Guidelines
20 October Guiding Plan for the B2 District 5-7
Building Height and Size
The B2 District should be visually distinct from the rest of Arden Hills
and clearly express that distinction. It should grow to be a visual, social
and psychological center of Arden Hills.
It should an intensely developed part of the community, and that density
should foster increased walking.
The way in which buildings relate to the public street is one of the key
aspects of creating a sense of place and identity. Building placement and
height should serve to enclose and define the edges of County Road E,
making it somewhat of an outdoor room.
Building Setbacks
To support walking and enhance a sense of place, buildings should be set
close to the public street rather than being separated from the street by
parking. A landscaped space between the sidewalk and the building
approximately 20 feet wide would be appropriate.
Encourage that at least 50 percent of the largest building on each site
occupy the street frontage at the “build-to” line.
Coordinate building architecture to try to create active spaces in side
yards rather than just parking or service functions.
Building Height
Most new office, residential or mixed-use buildings are anticipated to be
in the height range of two to four stories. Buildings exclusively devoted
to retail and service businesses are expected to be one story.
Commercial building(s) taller than one story would be desirable on the
northern end of Arden Plaza to compensate for the difference in
elevation between the road and the site. At a minimum, a raised parapet
wall is needed there to shield rooftop equipment from views from the
road. A “second story expression” technique (exterior façade only)
could also be used.
Buildings taller than four stories may be considered northwest of County
Road E, where the tallest buildings and greatest intensity of land
coverage should be guided. Building height may be limited by the effect
of the project on traffic circulation, which will be assessed during the
review process.
District Design Guidelines
5-8 Guiding Plan for the B2 District 20 October
Future residential buildings could be three or four stories in height, include
parking under the building or in a structure, and be located along the
street with space for trees and other landscaping behind the public
sidewalk. Building mass should be broken with materials, setbacks,
window patterns and balconies.
Parking
Parking areas or structures for office or residential buildings that are
in close vicinity to County Road E or Lexington Avenue should be
located behind (preferably) or beside the building.
Allow parking between buildings to the extent that parking in the
side yard accounts for no more than 50 percent of parking on the site.
Sufficient parking should be provided to accommodate the
reasonable hourly peak on a given site. Parking should be shared
among buildings on a site to reduce the land devoted to parking.
Hourly variations among different types of land use should be
considered when estimating parking demands.
Provide on-street parking along Pine Tree Drive and Harriet Avenue.
Demarcate on-street parking bays with pedestrian “bump-outs” at
driveway or street intersections.
Green islands and trees should be incorporated into parking lots to
increase their visual appeal. Where feasible, pervious surfaces
should be used to reduce stormwater runoff.
District Design Guidelines
20 October Guiding Plan for the B2 District 5-9
Retail Building Size
The floor area of any individual retail business should not exceed 50,000
square feet. “Big box” retail businesses will not be allowed in this
district. Certain service businesses such as a fitness center may exceed
that figure.
Quality
Exterior Building Materials
Buildings should be constructed of materials that are enduring,
timeless and well-detailed.
Exterior building materials should be primarily face brick, stone,
decorative concrete plank, transparent glass and/or metal (as an
accent and trim material). Other high-quality materials that increase
the variety and appeal of buildings may be considered as accents.
Metals should have a matte finish and neutral or earth tone colors.
Metals that are used for exterior walls should have visible corner
moldings and trim.
Undesirable materials include wood except as an accent material,
mirrored or tinted glass especially on the first floor, simulated brick
or stone, vinyl or aluminum siding, concrete blocks, materials that
have no pattern or relief especially when applied to large walls,
materials that represent corporate colors or trademarks, brightly
colored metal roofing or canopies, pre-cast tilt-up walls, and
synthetic awnings particularly when illuminated from the rear.
Exterior Building Design
Buildings should be articulated, especially with windows and doors,
to reduce their apparent size and create visual interest from the street.
Long blank exterior walls should not be allowed.
Building volume should be broken with recesses and projections
such as porches, dormers and bays that create shadows and add
visual interest. Volume may also be broken with multiple roof and
ridge lines perpendicular to one another or offset to avoid single roof
lines.
Facades of commercial buildings should be designed to convey the
impression of a series of individually-constructed small storefronts.
Façade treatment should be carried around all sides.
District Design Guidelines
5-10 Guiding Plan for the B2 District 20 October
Approximately 70 percent of the first level façade that includes the
major store entrance and/or faces a public street should be
transparent (have windows and doors). Windows should be made of
transparent glass and recessed at least one inch rather than being
flush with the façade.
Awnings or overhangs should be provided at entryways to provide
shelter from the sun and rain.
Exterior lighting for parking lots and buildings should not be
excessive and should be directed at their intended purposes.
Any multi-level building should distinguish the ground floor level
from the upper floors by use of these techniques: an intermediate
cornice line, difference in building materials or details, awnings
trellis or arcade, special window details, or brick corbels or quoins.
A strong base and top for multi-story buildings should be established;
middle layers should be simpler. Detail should be an integral part of
the architecture rather than a series of applied elements.
Mechanical systems and service areas should be integrated into in the
architecture of the buildings. Garbage and recycling containers
should be fully enclosed and integrated into the architecture of the
buildings.
Business signs should be architecturally compatible with the style,
composition, materials, colors and details of the building and should
be an integral part of the building. Signs should be incorporated into
the facades of the buildings rather than extending past the roof line
and should not project more than 12 inches beyond the plane of the
façade. Retail business wall signs should be located in a position
above the front window that is located consistently among stores.
Backlit signs should not be allowed on the street side of new
buildings with 100 feet of a public street. Pylon, rooftop and
portable changeable message signs should not be used.
Franchise architecture identified with a particular chain will be
discouraged unless it is architecturally integrated into the district and
approved building materials are used. Drive-up windows may be
allowed if conflicts with pedestrian traffic are minimized.
Truck docks and delivery areas should face away from the public
street and integrated into the architecture of the building where
feasible.
Lighting under a gasoline station canopy should not be directly
visible from the street but should be recessed into the canopy or
otherwise shielded.
District Design Guidelines
20 October Guiding Plan for the B2 District 5-11
Civic
Gathering Space
All commercial elements of the B2 District should be considered a
public gathering space for the community. Every commercial
building should offer opportunities for some degree of gathering.
Spaces should be created to encourage interaction and gathering.
In Arden Plaza, there should be an attractive and functional outdoor
seating area or two near businesses that offer eating and drinking.
Public art should be used near the district focal point, the Pine Tree
Drive intersection, and possibly other locations. Public art may
range from vertical, sculptural elements to creative touches
integrated with walls or pavements.
Attractive bus waiting shelters should be installed.
A public or private “town
green” should be created
as part of the potential
redevelopment north of the
new Lake Johanna
Boulevard.
District Design Guidelines
5-12 Guiding Plan for the B2 District 20 October
Movement
Bicycling
Work through Ramsey County to rebuild and restripe County Road E
to include a pair of striped bicycling lanes plus a landscaped median.
Construct a dedicated bicycle/pedestrian connection over Minnesota
Highway 51, which could be part of a rebuilt bridge over Highway
51, an addition to the existing bridge, or a separate bridge.
Walking
There should be a six-foot-wide concrete sidewalk along both sides
of County Road E; along the east side of Pine Tree Drive and the
north side of Harriet Avenue; and along the west side of Pine Tree
Drive from County Road E to the entrance to the Country Financial
site.
When reasonably feasible, raised concrete walkways should be used
to connect perimeter public sidewalks to the front door of each
building in the district.
Bump-outs should be installed to help pedestrians cross Pine Tree
Drive and Harriet Avenue.
Construct a dedicated bicycle/pedestrian connection over Minnesota
Highway 51, which could be part of a rebuilt bridge over Highway
51, an addition to the existing bridge, or a separate bridge.
Drive-up windows should be discouraged because of their impact on
pedestrians. However, if they are allowed, they should be located so
as to minimize such effects.
District Design Guidelines
20 October Guiding Plan for the B2 District 5-13
Green
Private Spaces
A generous amount of plant material should be used on every new
development site. Office parking areas should include generous
perimeter and internal landscaping. Parking structures should have
upgraded façade finishes and be visually softened with plantings.
Parking Areas
Plantings should be used to soften and shade parking lots and parking
structures. Parking and service areas should be visually screened from
street views with plantings and architectural treatments.
Parking lots islands should be used to distribute large parking fields into
separate “outdoor rooms” that have visual relationships to the buildings
they serve. Parking lot islands should be planted with trees or include
infiltration basins and naturalized plantings. Entry drives should be
defined by trees and shrubs.
Parking adjacent to street should be screened from views with low
hedges or masonry walls. Berms should not be used.
Country Financial Woodland
The City should work with Country Financial to determine whether a
more clear and formal announcement of the availability of its walking
paths can be made at Pine Tree Drive.
Crepeau Nature Center
Connections from the district to the Crepeau Nature Center should be
more clearly announced.
21 October Guiding Plan for the B2 District 6-1
Traffic Study Conclusions and
Recommendations
A traffic impact study was prepared for the Guiding Plan, a full version of which is
presented in Appendix A. The following summary conclusions and recommendations
are an outcome of that study.
County Road E Corridor
The roadways and study intersections within the study area currently operate acceptably
at Level of Service (LOS) D or better and will continue to operate at LOS D or better
through the 2030 Build scenario when the redevelopment is anticipated to be fully
occupied.
The County Road E corridor has a wide center two way left turn lane down the middle as
well as many driveway intersections. This leads to a vehicle dominated corridor that is
unfriendly to pedestrians and bicycles. It is envisioned County Road E will operate as a
vibrant, multi-modal corridor that will attract pedestrians and bicycles. To provide a safe
multi-modal corridor, the following long range improvements are recommended:
Construct a landscaped median on County Road E from Highway 51 to Lexington
Avenue to convert the private driveways along County Road E into right-in/right-out
accesses.
Driveways should be consolidated whenever feasible to limit the conflict points along
the corridor.
Provide left turn lanes at public street intersections.
Provide on street bicycle lanes.
Provide sidewalks along the length of County road E and to the businesses, including
a connection to Arden Plaza near to the County Road E and Lexington intersection.
Improve the landscaping to provide a human scale to the corridor.
Provide eleven foot wide travel lanes which will reinforce the 35 mph speed limit.
Minimize traffic signs within the corridor whenever feasible.
Extend the bicycle and pedestrian facilities through the County Road E/Hamline
Avenue interchange when it is reconstructed.
Reconstruct the corridor using the existing curb and gutter system to minimize the
cost. This will also shorten the construction period, lessening the impact on local
businesses.
Traffic Plan Summary
6-2 Guiding Plan for the B2 District 21 October
County Road E is under the jurisdiction of Ramsey County. The City will need to work
collaboratively with the County to gain approval for these recommended improvements.
Intersection of County Road E, the Holiday Inn Site and the Arden
Plaza Driveway
The driveways on County Road E for the Holiday Inn site and the Arden Plaza site will
experience significant delay and queuing in the p.m. peak hour even though the overall
intersections will operate within traffic engineering standards. This is acceptable as an
interim situation because it is not expected to pose a safety problem, little queuing is
anticipated on County Road E. Long term, the queuing will impact the vitality of the
redevelopments and could lead to safety problems.
These driveways should be realigned midway between Pine Tree Drive and Lexington
Avenue to provide a four legged intersection that could be controlled with a traffic signal.
Left turn lanes and shared right/through lanes should be built on the new north and south
legs of the intersection to provide adequate egress. The signal should be installed when
the traffic volumes at the intersection meet the criteria for installing a traffic signal per
the Minnesota Manual on Uniform Traffic Control Devices. When the traffic signal is
installed at the new intersection it will operate at LOS B in the 2030 Build p.m. peak
hour. This leaves capacity to accommodate significantly more redevelopment as long as
the traffic from the redevelopment is focused at the signalized intersection.
Short-Term Development Assumptions Used in the Traffic Study
Three short-term redevelopment possibilities were identified through the planning
process. Although redevelopment may occur outside these areas, the traffic study
analyzed the effect of redeveloping the Pot o’ Gold, Holiday Inn and northern Arden
Plaza properties. These properties may redevelop differently but the below numbers
were used to show the impact if they were redeveloped. Specifically:
The Pot o’ Gold bingo hall was assumed to be replaced with 15,000 square feet of
office.
The former Holiday Inn hotel was assumed to be replaced with 95 apartment units
and 120,000 square feet of office.
The 46,000 square feet of offices on the northern part of the Arden Plaza site was
assumed to be replaced with a 14,000 square foot pharmacy and 5,000 square foot
retail space.
7-1 The New Lake Johanna Boulevard 21 October
Plan Implementation Program
The Guiding Plan for the B2 District will be carried forward through these and other
actions.
Comprehensive Plan
The City Council should approve and accept this plan and then:
1. Adjust the comprehensive plan to reflect Figure 9, Land Use Plan, in the citywide
land use plan map.
2. Adopt this plan “by reference” into the comprehensive plan.
Zoning Ordinance
The City will amend the B-2 zoning district to allow the full range of land uses
recommended in the Guiding Plan: retail and services businesses, office buildings and
high-density housing as principal land uses. Allow light industry as a conditional use;
specify a minimum number of jobs per acre and exterior appearance standards. Require
that all applications be submitted and reviewed as planned-unit developments. Expand
the map coverage of the B-2 district to include the Hunters Park residential area.
Site Plan or Planned-Unit Reviews
The City of Arden Hills will review each development application by conferring with
each applicant before the application is submitted, by applying the terms of an amended
B-2 zoning district and, when appropriate, interpreting this plan when judgment is
needed.
Traffic and Streetscape Improvements
Prepare a specific plan and engineering feasibility study for traffic, landscaping, lighting
and pedestrian improvements along both County Road E from the eastern ramp terminals
of Highway 51 to and including the Lexington Avenue intersection as described on page
4-7 of chapter 4.
Streetscape Improvements
Determine during this planning process the most feasible location for additional
landscaping and sidewalks, taking into account the limited space in the public right-of-
way outside the curbs.
Implement the street landscaping plan by obtaining easements from property owners since
Plan Implementation Program
7-2 The New Lake Johanna Boulevard 21 October
the space for such landscaping will be entirely on private property (the public right-of-
way is almost entirely taken by the road). The City could potentially design, fund and
install the improvements on easements, though working with private enterprises and non-
profit partnerships is encouraged for implementation and long-term maintenance.
Estimated Costs and Potential Funding Sources
The preliminary cost estimate for the traffic and streetscape improvements is $2.0 million
(2008 dollars).
Funding sources will be determined by the City Council but could include:
City general funds
Special assessments on benefiting properties
Private sources
Municipal State-Aid funds
Tax increment financing
Tax abatement
Ramsey County funds
Grants
The preliminary estimated costs do not include utility or other underground work, which
would need to be evaluated during the feasibility study and potentially included with the
streetscape improvements.
Timing the Median Construction and Access Changes
It is important to note that the County Road E improvement plan calls for building a
raised, landscaped median that would eliminate left-turn traffic movements except at the
signalized intersections at the Highway 51 ramps, Pine Tree Drive, a planned new
intersection between Pine Tree Drive and Lexington Avenue, and Lexington Avenue.
That median would, thus, affect all businesses in the corridor particularly the high-
volume retail enterprises and especially Arden Plaza, the largest retail operation in the
study area.
Creating a new signalized intersection between Pine Tree Drive and Lexington Avenue is
judged to be essential for the long-term viability of Arden Plaza and the former Holiday
Inn site. The City wishes to achieve this improvement while minimizing or totally
avoiding adverse effects on those two properties. Coordination of the public
improvement with the redevelopment of both of the private properties is essential.
Therefore, the City will continuously consult with all affected property owners in the
corridor before ordering these improvements with the aim of targeting the ideal year.
However, if one property redevelops before the other and the new intersection is judged
to be critical to its success, the City Council will take that into consideration.
It goes without saying that Ramsey County will be involved in this process since the
County has jurisdiction over the road. The City of Shoreview will also be closely
Plan Implementation Program
7-3 The New Lake Johanna Boulevard 21 October
involved because it is proposed that the streetscape improvements be carried a short
distance into that community and the signal system at Lexington may be updated.
Supplementary Road Name
Add a supplementary name to County Road E in Arden Hills: Lake Johanna
Boulevard, which is the local name used on County Road 149 west of Minnesota
Highway 51. This name change will help identify the road as a local facility with a
connection to a nearby natural feature and thereby personalize it; however, the existing
County Road E name could also still be used by residents and businesses as needed.
Continuity
This plan should be used on a long-term basis for the purpose of amending the zoning
ordinance, making public improvements and reviewing development applications. The
plan may be reviewed periodically and updated by the Planning Commission and City
Council to ensure that it continues to be useful in those tasks.
Plan Implementation Program
7-4 The New Lake Johanna Boulevard 21 October
Summary of Actions
Short-Term
Name: Add the supplementary name of Lake Johanna Boulevard to County Road E.
Zoning: Adjust the text of the B-2 zoning district to match the guidance of the plan,
specifically the design guidelines in Chapter 5.
Site Plan Reviews: Use the plan for guidance in site plan or Planned-Unit
Development reviews. Consider proposals that would result in the redevelopment of
the Arden Plaza office buildings and a more vibrant retail center as long as the
resulting traffic is consistent with the assumptions and forecasts for the existing
northern driveway as used in the traffic study (Appendix A).
Funding: Begin to seek funding for improvements to County Road E and the
construction of the pedestrian and bicyclist connection over Highway 51 from
Ramsey County and other sources.
Communications: Continuously consult with property owners along County Road E
regarding the timing of their redevelopment plans for the purpose of coordinating the
construction of a median and traffic signal on County Road E with their changes.
Mid-Term
Road Improvement Plan: Prepare a more detailed streetscape improvement plan and
engineering feasibility study for improvements to County Road E. Prepare a financial
plan. Involve the City of Shoreview. This step could be moved forward if
redevelopment moves faster than anticipated.
Road Reconstruction: Construct the improvements to County Road E, Pine Tree
Drive and potentially part of Lexington Avenue.
Maintenance: Regularly replace seasonal flowers at the entrance monuments and
decorative banners to the light poles along Lake Johanna Boulevard and Pine Tree
Drive. Maintain the driving surfaces (with Ramsey County).
Site Redevelopment: Use the plan as guidance when reviewing applications for land
redevelopment. Shift the northern access to Arden Plaza west to a new signalized
intersection when a second phase of redevelopment occurs.
Longer-Term
Lexington Avenue: Collaborate with the City of Shoreview on a streetscape
improvement plan for Lexington Avenue.
Site Redevelopment: Use the plan as guidance when reviewing applications for land
redevelopment.
Guiding Plan for the B2 District A-1
Appendix A
Traffic Impact Study
Due to the length of the Traffic Impact Study, a copy may not be included with this
printing. A copy is available at City Hall and online at www.ci.arden-hills.mn.us.
Guiding Plan for the B2 District B-1
Appendix B
Comments from the Community Visioning
Meeting
20 May 2008
Strengths
University students use the district
Existing businesses already in place and known, centralized (3)
Variety / Mix of businesses, good shopping (10)
Serves some consumer needs, serves local needs (2)
Nice business district
Lower density of businesses
Small family businesses, local, neighborhood retail, useful, small town feel, no big box
stores, unique (22)
Variety of office space and employment opportunities (2)
Historically this was the main business area for Arden Hills
Arden Plaza, hardware store, pharmacy, post office (7)
Convenient banking (2)
Source of good tax income for Arden Hills
Accessibility via arterial streets and from neighborhoods (3)
Retail shops within walking distance of neighborhoods
Easy access to neighborhoods, centrally located (4)
Ease of access for pedestrians, bikers, and autos, manageable traffic (4)
Some pedestrian sidewalks
Decent parking
Possible light-rail future opportunities
Central to other commercial development, large chains on Lexington (2)
Good access from Snelling Avenue and I-694 and Lexington Avenue (9)
Traffic flows well except at rush hour, good amount of traffic (2)
County Road E can support development, four lanes, turn lanes (3)
The area is well defined, has a beginning and end
Large area and can accommodate a variety of uses
Small town layout, residential feel, quite side streets (3)
Area has a pattern of development that can be built upon
Most existing development does not directly conflict with obvious future plans
Strong community feel and quaintness, friendly, meet neighbors (3)
Relatively calm visually
Buildings are setback from street, not right on the street
Stability
Railroad tracks create natural division of land uses
Has redevelopment opportunities and open areas
B-2 Guiding Plan for the B2 District
Aged in such a way that it is close to turning over
Two large parcels on prime corner
Little in the area that needs to be preserved
Narrow street and bridge
Banners on light poles
Open green space, landscaping, and mature trees (9)
Quality parks nearby, undeveloped areas, and trails (3)
Close to beach
Need to include environmental concerns and impact in planning future development
Wide street has potential for landscaping or boulevard
Weaknesses
Scum on pond, brings mosquitoes
Doesn’t draw strangers to existing businesses
Low Patronage by majority(?) of residents
Retail trending to downscale/vacancies/transient (6)
Ugly Bingo Parlor, bingo traffic (3)
Poor mix of businesses, needs grocery store, needs variety, small businesses (8)
Existing business are struggling (2)
Large existing businesses are unlikely to want to change, or difficult to redevelop compatibly
(2)
Lack of good restaurants/dining/neighborhood café/ethnic/healthy (9)
Lack of night time activity
Weak potential for residential/mixed use
Lack of residential housing to make it feel more like a downtown
Rail makes residential uses unattractive
Architecture is blah and uninteresting, no public square, lack of diversity (3)
Not attractive buildings, blank walls, too much asphalt (3)
Setbacks are inconsistent – no real “flow” visually on E2
Somewhat chaotic visually, lacks obvious plan, especially on north side of E (3)
Needs more continuity architecturally, non-uniform architecture, needs harmony (4)
Arden Plaza needs a new look, better signage, outdated office pods (4)
Lack of community gathering spot, central park (2)
No gateway entrance identification, bad signage (2)
No cultural or art attractions
More Green, trees, etc (2)
Needs decorative lighting (3)
Too many parking lots right on County Road E
No Access to Public Transit (3)
Area is not bicycle and pedestrian friendly, needs more connectivity through City, especially
from west, few sidewalks and bike paths (15)
Lack of sidewalk on north side of E (2)
No designated bike trail, better bike access through city (5)
Poor pedestrian/bike access across 51, bad bridge, too narrow, unsafe (14)
Lousy/unsafe access for vehicles, turning onto Lexington is difficult, poor circulation (3)
Guiding Plan for the B2 District B-3
Traffic in and out of Arden Plaza and internal circulation is bad (3)
Heavy traffic, too much, especially during rush hour (8)
Too many access points, curb-cuts (3)
51 and E is a dangerous intersection (2)
Train that goes every hour on the ½ hour backs up traffic (3)
Opportunities
Keep all the property on the tax rolls
Make retail areas more accessible by pedestrian and bike traffic, from all directions, safe
crossings (8)
Promote ease of access for pedestrians, bikes, and autos (2)
Prominent bike paths, sidewalks or walking paths on both sides of street (5)
Circulator bus for area
No more than 2-3 curb cuts into business sections, put a frontage road to limit access points,
particularly Mr. Movies and TCF (3)
Alter Curb cuts to more “street-like” elevation (not up over sidewalks)
Better street circulation
Four-lane Bridge, with pedestrian walkway and bike lane (8)
Better turn lanes or roundabout (3)
Add right hand turn lane from northbound Snelling/Hamline to east bound Co Rd. E
Two lanes each way on Lex. South of E
Right turn lane from eastbound Co Rd. E to southbound Lex.
Two left turn lanes from eastbound Co Rd. E to northbound Lex
Right turn lane from southbound Lex to westbound Co. Rd. E
Circulation road behind Flaherty’s and Corp Express so buildings can be closer to E.
Lower speed limits
Traffic hub with mass transit to major metro access; hub to include retail and service shops to
support those utilizing mass transit
Plan with Shoreview for a transit hub/depot with structured parking on NE corner of Co Road
E and Lexington.
Keep traffic down
No trucks
Limit traffic congestion
Extend Connelly Ave across railroad track to connect with Grey Fox Road
Parking behind stores (3)
Parking structure up against the railroad to preserve the Co. Rd. E frontage
On-Street parking (3)
Some residential mixed in with retail
Encourage and support businesses that citizens want as part of their “neighborhood” (2)
Neighborhood businesses on north side of the street
Viability of Grand Avenue
Retail Office Supply
Variety of service stores and retail (3)
Nice upper end shops
Home improvement retail
Anchor store such as Costco (no Walmart) (2)
Post Office
B-4 Guiding Plan for the B2 District
Small Businesses/restaurants, Unique restaurants, inexpensive, ethnic, Small specialty shops:
bakery, coffee, book store, Asian take-out, clothing, gifts, drugstore, toy store, green products
store, ice cream, shoe repair, cleaners (7)
Small scale neighborhood commercial with a common architectural theme
Food: Co-op, farmers market, interesting restaurants, real restaurants, sit-down, neighborhood
bar/café – but not a chain, more wine selection (6)
A Sweet Tomatoes Restaurant
Trader Joe’s (2)
Someplace to have real ice cream cones – not soft serve
Keep pharmacy and Ace Hardware
No big box retail (3)
Replace Bingo Hall with dining or motel or housing
Close down bingo hall
Farmers market in Arden Plaza parking lot
Remove octagon buildings and replace with not “cutsie” small businesses visible from all
sides (no Walgreens, CVS, or Bigbox)
Holiday in as conference center/community center (3)
Holiday Inn converted to senior housing project within current building
Mixed use on Holiday Inn site (residential above community/retail/office/services) (2)
Mixed-use, including residential (3)
Should have a multi-use zone so that residential could be mixed with the retail
Consider needs of local corporations; Boston Scientific, Land-o-Lakes, Deluxe, etc.
Put library where bingo hall is and have food and gathering place
Move City hall to Arden Plaza/general area (2)
Ramsey County library portal
Consider public purpose for Arden Plaza – library?
Some kind of community plaza where people can gather – town square
Community Park
A focus place where people can eat and gather, public meeting areas or room in old holiday
inn hotel
Community bulletin board
Divided roadway with landscaping
Wide boulevards for pedestrian walkways, landscaping (8)
Multi-use sidewalk north of Co Road E and west of Lexington Avenue and safe crossing
areas to cross Lexington
Walks and trails should compliment the existing trail system
Uniform trees and street lights (2)
Pedestrian friendly square, fountain, occasional street vendors (2)
Good landscaping, pleasant surroundings, outdoor patios, water
Signs along Snelling for Northwestern College
Improve park and hockey rink size/access
Change name of County Road E to…community choice
Continued small town feel, Arden Hills community identity (3)
People friendly amenities
Low Building profile, no building taller than 3 stories (2)
Outdoor art
Large setbacks
Buildings that architecturally flow together, that do not “age”, blend with environemnt (7)
Quality architecture, not franchise architecture
Guiding Plan for the B2 District B-5
Gateway signage
Work together with Shoreview to improve the corner aesthetically; trees, sidewalk,
landscaping, use of retail space
Mix of business and landscaping
Maintain trees and green spaces (5)
Utilize wind mill structures around community
Plan for green or LEED design in all housing types
Page 1 of 5
AGENDA ITEM – 3C
MEMORANDUM
DATE: July 8, 2026
TO: Planning Commission Chair and Commissioners
FROM: Jake Reilly, Community Development Director
SUBJECT: Planning Case #26-017 – Public Hearing Required
Applicant: Ryan Companies
Request: Zoning Code Amendments – Chapter 13, Section 1380 – TCAAP
Redevelopment Code for Definitions and Building Site Development
Requirements
Commission Should Consider
Ryan Companies is proposing ordinance language to amend Chapter 13 within Section 1380,
TCAAP Redevelopment Code, Subsection 4.0 – Definitions and Subsection 6.0 Building and Site
Development Standards to modify language pertaining to clear height and loading docks in Rice
Creek Commons. Ordinance language would be added to clarify the definition of “clear height”
and revise related standards to reflect modern commercial/industrial operational needs. The
proposed amendments to City Zoning Code Chapter 13 are within the following Section:
• Section 1380 – TCAAP Redevelopment Code,
o Subsection 4 – Definitions: Clear Height
o Subsection 6.1 (e) (i) Loading Dock Standards
Background
TCAAP Joint Development Authority
In November 2012, the City Council approved a Joint Powers Agreement (JPA) with Ramsey
County which establishes a partnership between the City of Arden Hills and Ramsey County with
the goal of the remediation and redevelopment of the 427-acre Twin Cities Army Ammunition
Plant (TCAAP) site. Under the JPA, the City and County created a Joint Development Authority
(JDA) that is the joint governing entity of the TCAAP site as allowed by the Joint Powers Act and
MN State Laws. The JDA is the authority responsible for, but not limited to, environmental
remediation, elimination of blight, infrastructure construction and financing, comprehensive
planning and zoning, and economic development and redevelopment. The JDA Board is comprised
of two County Commissioners, two City Councilmembers, and an additional non-elected City
appointee as the Chair.
Page 2 of 5
Between 2013 – 2016, the city facilitated the process of developing the Master Plan for the TCAAP
site, which as noted above was the responsibility of the city under the JPA. Planning elements of
the Master Plan included defining the public engagement process, land use, circulation and
movement, utilities, environmental remediation, parks and open space, implementation plan, and
a regulatory plan. In 2016, the City adopted the TRC, Section 1380 of the zoning code which
includes the regulating plan, land use table, design standards, and other regulations related to land
development that are specific to the TCAAP site.
Through the JPA in the event the JDA believes the TCAAP Master Plan should be amended that
shall be referred to the City and County for review. The city maintains the responsibility for
processing TRC and Comprehensive Plan Amendments. As part of a TRC Amendment, the City
will request confirmation of approval by Ramsey County.
Ryan Companies and “Outlot A”
In 2024 Ryan Companies entered into a purchase agreement with Ramsey County for the portion
of Rice Creek Commons known as “Outlot A.” Outlot A is designated as CC – Campus
Commercial in the TRC. Campus Commercial is described in the TRC as “facilitat[ing] a building
format that allows multiple, single tenant buildings or campuses within the northern “Thumb” site
of the Plan Area. The goal is to allow for an individual plan approach for each campus or building,
based on user preferences within a range of requirements.
In 2025 Ryan Companies received required approvals from the JDA, City, and County to construct
an office and manufacturing facility on the north side of Outlot A, off of Rice Creek Parkway.
That facility was completed in 2026 and is occupied by Micro Control Company. Ryan Companies
is working toward completion of the campus-style development with additional
commercial/industrial users.
Based on the experience working with architects and engineers for the existing light-industrial
manufacturing use, Ryan Companies is requesting changes to the TRC in response to current Twin
Cities industrial real estate market data and design constraints associated with the existing code
language and design requirements for mezzanine office configurations and the structural and
internal functional needs of today’s light-industrial manufacturing facilities.
Overview of Ordinance Amendments
The proposed ordinance amendment is included for Planning Commission review as Attachment
D. The draft language provides a revised definition of clear height and for a greater maximum
clear height in facilities that include a loading dock. Amendments to Section 1380 – TCAAP
Redevelopment Code, are only applicable to projects associated with the Rice Creek Commons
area of Arden Hills.
Section 4.0 - Definitions
Current Language
Clear Height is defined as, “The distance from the top of the finished floor to the bottom of the
finished ceiling in portions of commercial buildings used for warehousing or manufacturing.”
The Applicant states that the experience developing the Micro Control Company site identified
internal inconsistencies in the TRC associated with maximum building height, clear height, and
the definition of clear height.
Page 3 of 5
Proposed Language
The Applicant proposes to amend the definition of clear height to respond to the market standard
for industrial users, specifically those described by the Applicant as “advanced tech.” Users of this
nature include industries prominent in the Twin Cities metropolitan area including in Arden Hills
such as Boston Scientific, Ecolab, Micro Control, 3M and others. The proposed definition is, “The
distance from the top of the finished floor to the lowest point of the lowest structural steel member
in portions of commercial buildings used for warehousing or manufacturing.”
In the submitted narrative, the Applicant states that the amended language is the result of lessons
learned during Phase 1 development of Outlot A, current Twin Cities industrial real estate market
data, and design constraints associated with mezzanine office configurations.
Section 6.1 (e) (i) Loading Dock Standards
Current Language
The existing text identifies a maximum clear height of 24 feet:
(e) Loading Dock Standards:
i. Facilities that include a loading dock shall have a maximum clear height of twenty-four
feet (24’) as measured from the surface of the ground floor to the lowest point on the ceiling.
ii. No more than one loading dock shall be allowed per 10,000 square feet of building area.
iii. Cross docks, where loading docks are situated along two (2) walls of the same building,
shall not be permitted.
iv. Loading docks shall be located in the side or rear yard and shall be screened from view
of the public right-of-way.
Proposed Language
Facilities that include a loading dock shall have a maximum clear height of thirty-two feet (32’)
as measured from the top of finished floor to the lowest point of the lowest structural steel member.
The Applicant describes these two changes as being necessary to address the fact that the TRC as
adopted has internal conflicts where the maximum building height is 15 stories and the maximum
clear height for buildings with a loading dock is 24 feet, yet any building that is 15 stories tall
requires a loading dock. Similarly, the code identifies two different definitions for clear height,
one in 4.0 Definition as the top of the finished floor to the bottom of the finished ceiling and in 6.1
where the clear height maximum is established and clear height is described as being measured
from the surface of the ground floor to the lowest point on the ceiling. These conflicts in the code
therefore inadvertently limit the usefulness of buildings for the proposed uses identified in the
TRC for Campus Commercial.
The amendments as proposed, according to the Applicant, are simpler and clearer and will allow
for flexibility for a potential tenant pool. The Applicant’s materials described a 28-foot to 32-foot
clear height as the market standard for the desired industrial uses. Staff is aware that one potential
reason for establishing the 24-foot clear height is to minimize the likelihood of undesirable
industrial uses such as strict warehouse/packing/picking operations. Other provisions in the TRC
offer additional parameters to minimize those types of project proposers’ interest in the site, both
for Outlot A and for the “California Parcel.” Some of the other code provisions that limit the
likelihood of those uses include a limitation on the number of loading dock bays per wall/façade
and a limitation on the size/percentage of warehousing uses overall.
Page 4 of 5
Notice
A Zoning Code Amendment requires a public hearing. Notice was published in the Pioneer Press
on June 26, 2026. The city has not yet received any public comments regarding this case.
Findings of Fact
The Planning Commission must make a finding as to whether or not the proposed application
would adversely affect the surrounding neighborhood or the community as a whole based on the
aforementioned factors. Staff offers the following findings for consideration:
General Findings:
1. The Applicant is proposing to amend ordinance language in Chapter 13 – Zoning Code
Section 1380 – TCAAP Redevelopment Code.
2. The proposed ordinance amendment aligns the definition and description of Clear Height
with industry standards.
3. The Applicant states that the proposed ordinance language will address current industrial
real estate market data and remove design constraints associated with mezzanine office
configurations.
4. The proposed ordinance amendment would allow for a maximum clear height of 32 feet
for facilities that include a loading dock.
5. The Applicant states that loading dock door dimensions and configurations will continue
to follow standard industry dimensions.
6. The Applicant states that the proposed ordinance language does not impact design
standards established in the TRC.
7. The proposed ordinance amendments are generally in the public interest and in keeping
with the City’s Comprehensive Plan.
8. Amendments to the Zoning Code regulations require a public hearing prior to action by the
City Council.
Options and motion language
• Recommend Approval: Move to recommend approval of Planning Case 26-017 as
presented (or as modified by Planning Commission) for Zoning Code Amendments to
Chapter 13 in Section 1380 – TCAAP Redevelopment Code of the Arden Hills City Code
to modify language to modify language pertaining to clear height and loading docks in Rice
Creek Commons as described in the July 8, 2026 Planning Commission staff report.
• Recommend Denial: Move to recommend denial of Planning Case 26-017 as presented for
Zoning Code Amendments to Chapter 13 in Section 1380 – TCAAP Redevelopment Code
of the Arden Hills City Code to modify language pertaining to clear height and loading
docks in Rice Creek Commons: findings to deny should specifically reference the reasons
for denial.
• Table: Move to table Planning Case 26-017 as presented for Zoning Code Amendments to
Chapter 13 in Section 1380 – TCAAP Redevelopment Code of the Arden Hills City Code
to modify language to modify language pertaining to clear height and loading docks in Rice
Creek Commons: the Planning Commission should identify a specific reason and/or
information request should be included with a motion to table.
Page 5 of 5
Budget Impact
N/A
Attachments
Attachment A: Land Use Application
Attachment B: Applicant Narrative
Attachment C: Applicant Memo Outlot A Lessons Learned
Attachment D: Draft Language – Section 1380 – Subsection 4.0 Definitions and Subsection 6.1
Building and Site Development Standards – General to All Zoning Districts
Page 1 of 3
1245 West Highway 96
Arden Hills, Minnesota 55112
Telephone (651) 792-7800
Fax (651) 634-5137
www.cityofardenhills.org
For Office Use Only
Planning Case No. 26-
Submittal Date
Application Completed Date
Accepted by
Receipt Number
Council Decision
Council Decision Date
2026 LAND USE APPLICATION
Applicant Information
Applicant:
Address:
Telephone No.: Other:
Fax No.:
Email Address:
Property Information
Property Owner:
Owner Address:
Owner Telephone No. Other:
Address of Property Involved:
Legal Description:
Property ID No.:
Type of Use:
Zone: Property Acreage:
Type of Request
Comprehensive Plan Amendment (Fee: $600 +
Escrow: $2,500)
Conditional Use or Interim Use Permit/CUP or IUP
Amendment (Fee: $500 + Escrow: $1,500)
Preliminary Plat (Fee: $600 + Escrow: $2,500)
Final Plat (Fee: $400 + Escrow: $1,500)
Concept Plan Review (Fee: $400 + Escrow:
$1,500) Master Planned Unit Development or Master Special Development Plan (Fee: $600 + Escrow: $2,500)
Final Planned Unit Development or Final Special Development Plan (Fee: $400 + Escrow: $2,000)
Planned Unit Development Amendment or Special Development Plan Amendment (Fee: $400 + Escrow: $1,500)
Site Plan Review (Fee: $600 + Escrow: $1,500)
Rezoning or Rice Creek Commons Regulating Plan Amendment (Fee: $500 + Escrow: $1,500)
Zoning Code or TCAAP Redevelopment Code Amendment (Fee: $500 + Escrow: $2,000)
City Code Amendment (Fee: $500 + Escrow: $2,000)
Lot Split/Minor Subdivision (R-1 and R-2 Districts
Only) (Fee: $400 + Escrow: $1,500) Variance or Permitted Adjustment (Fee: $400 + Escrow: $1,500)
Vacation of Easement or Right-of-Way (Fee: $200 + Escrow: $1,000)
Appeal of Administrative Decision (Fee: $200 + Escrow: $1,500)
Land Use Requests – Not Already Specified (Fee: $150 + Escrow: $1,000)
Ryan Companies US, Inc, Eddy Wolf
533 South Third Street, Suite 100, Minneapolis, MN
612-492-4000
eddy.wolf@ryancompanies.com
X
Page 2 of 3
Brief Description of Request (please also include a typed, detailed letter explaining the project):
Filing & Information Requirements
The City requests that you make a pre-application meeting with the Community Development Director to discuss
the application process, requirements, and deadlines. Unless waived by the Community Development Director
or Planning Commission, a certified survey of the property is required for all applications. A checklist with
additional application requirements can be found at www.cityofardenhills.org/landuseapplications.
Complete/Incomplete Applications
Under Minnesota Statute, Chapter 15.99, cities have 15 business days to review all plans and application
materials to ensure they satisfy City requirements. During the 15 day review period, planning staff will provide
written comments on the application and may request plan revisions. If the application is determined to be
complete, Minnesota State Statute then requires the City to approve or deny the application within 60 days, up
to 120 days. If not complete, the City may require plan revisions and/or additional information before the
application is scheduled for Planning Commission review and/or City Council action. Project will not be
scheduled for any meeting until the application submittal is found to be complete by the Community
Development Director.
Payment of Fees and Escrows
The undersigned acknowledges that she/he understands that before a land use application can be deemed
complete, all required fees and escrows must be paid to the City. The applicant is responsible for all costs
incurred by the City related to the processing of this application. Each separate land use request shall be
charged a separate administrative fee and escrow even if submitted on the same application. Costs expended in
reviewing and processing an application will be charged against the cash escrow and credited to the City.
Charges to the escrow may include planning and engineering staff time, City Attorney and consulting fees, and
mailing costs. If, at any time, a required cash escrow is depleted to less than 20 percent of its original amount,
the applicant shall deposit additional funds in the cash escrow account as determined by the City. The City may
withhold final action on a land use application, withhold building permits, and/or rescind prior action until all fees
have been paid. Unused portions of an escrow are returned to the applicant upon successful implementation of
an approved plan. The escrow may be reduced or increased by the Community Development Director on a
project by project basis.
Notice of Meeting Attendance
In order for the Planning Commission and the City Council to consider any application, the applicant or a
designated representative must be present at the scheduled meeting. If not, the matter may be tabled until the
next available agenda.
*IMPORTANT*
• Certain applications are subject to review and approval by the Rice Creek Watershed
District. Contact RCWD directly at 763-398-3070 for additional information.
• The land use application fees do not cover building, sign, or other permit fees that
may be required upon approval of a land use application.
• All applications will be subject to additional fees for reimbursement of consultant costs
associated with filing, reviewing, and processing of application in the form of an
escrow to the City.
Request to amend TCAAP Redevelopment Code sections 4.0 Definitions (Clear Height) and 6.1(e)(i)
Loading Dock Standards. Please see attached documentation for additional information/details.
Page 3 of 3
Meeting Schedule
Planning Commission meetings are typically held on the first Wednesday after the first Monday of each month at
6:30 PM, though please contact City Hall to verify the meeting date and time. City Council meetings are held
typically the last Monday of the same month at 7:00 PM. Meetings are held in the Council Chambers at the City
of Arden Hills, 1245 West Highway 96, Arden Hills, Minnesota 55112, unless otherwise stated. The schedules
below are for reference purposes only. Project will not be scheduled for any meeting until the application
submittal is found to be complete by the Community Development Director.
2026 Planning Commission and City Council Schedule (*subject to change)
TENTATIVE
PLANNING
COMMISSION
MEETING DATE*
(Generally held on the
first Wednesday after the first
Monday at 6:30 p.m.)
TENTATIVE
CITY COUNCIL
MEETING
DATE*
(Generally held on the
fourth Monday at 7:00 p.m.)
DEADLINE FOR
LAND USE
APPLICATION
SUBMISSION
(1st day of the preceding
month)
January 7 February 9 December 1 (2025)
February 4 March 9 January 2
March 4 April 13 February 2
April 8 April 27 March 2
May 6 May 26* April 1
June 3 June 22 May 1
July 8 July 27 June 1
August 5 August 24 July 1
September 9 September 28 August 3
October 7 October 26 September 1
November 4 November 23 October 1
December 9 January 11 (2027) November 2
Acknowledgement and Signature
I hereby apply for the above consideration and declare that the information and materials submitted with this
application are complete and accurate per city code and ordinance requirements. I fully understand that I am
responsible for all costs incurred by the City related to the processing of this application.
__________________________________________________ ________________
Property Owner Signature (Required) Date
________________________________________________ ________________
Applicant Signature (If different than the property owner) Date
Please contact the Community Development Director at 651-792-7800
if you have any questions regarding this application.
Additional copies of this application form are available on the City’s website: www.cityofardenhills.org/landuseapplications
6/22/26
June 23, 2026
TRC Text Amendment Request
Ryan Companies is requesting the following two text amendments to the TCAAP Redevelopment Code,
adopted by the City Council of Arden Hills on July 13, 2015, as amended by Ordinance Nos. 2016-11,
2016-12, 2023-006, 2024-001, and 2024-002 (the "TRC").
1. Section 4.0 – Definitions
CURRENT TEXT:
PROPOSED AMENDED TEXT:
The distance from the top of finished floor to the lowest point of the lowest structural steel
member in portions of commercial buildings used for warehousing or manufacturing.
2. Section 6.1 (e) (i) Loading Dock Standards
CURRENT TEXT:
PROPOSED AMENDED TEXT:
Facilities that include a loading dock shall have a maximum clear height of thirty-two feet (32’) as
measured from the top of finished floor to the lowest point of the lowest structural steel member.
ADDITIONAL NOTES:
A. This text amendment is the result of lessons learned during Phase 1 development of Outlot A,
current Twin Cities industrial real estate market data, and design constraints associated with
mezzanine office configurations.
i. Reference Item #2 of the “Outlot A Lessons Learned” memo from Ryan Companies dated
May 7, 2025, regarding maximum building height considerations.
ii. Reference Cushman & Wakefield’s Market Data Brief outlining clear height standards within
the Twin Cities industrial market, particularly as they relate to mezzanine office users.
iii. Reference Ryan A+E’s building cross-section diagram, which illustrates key architectural and
MEP coordination constraints affecting building design and functionality.
B. All design standards currently established in the TRC will remain in full effect and unchanged.
C. Any potential adjustments are limited to precast panel height and functional clear height only.
D. Loading dock door dimensions and configurations will continue to follow standard industry
dimensions and are not proposed to be modified.
E. Ryan Companies is not proposing any text amendments beyond the two items identified above.
Chapter 13 within Section 1380, TCAAP Redevelopment Code, Subsection 4.0 – Definitions
4.0 Definitions Many terms used in this document are defined in the AHC, Chapters 1 and 13. Definitions are only included here if not defined in the AHC, or if the definition for this document differs from the AHC. In case of a conflict between the definitions under this Section and the AHC, Chapters 1 and 13, the definitions in this section shall supersede. C D Clear Height The distance from the top of the finished floor to the lowest point of the lowest structural steel member bottom of the finished ceiling in portions of commercial buildings used for warehousing or manufacturing.
Chapter 13 within Section 1380, TCAAP Redevelopment Code, Subsection 6.0 - Building
and Site Development Standards
6.1 General to All Zoning Districts (e) Loading Dock Standards: i. Facilities that include a loading dock shall have a maximum clear height of thirty-two twenty-four feet (2432’) as measured from the top of finished floor to the lowest point of the lowest structural steel member.the surface of the ground floor to the lowest point on the ceiling. ii. No more than one loading dock shall be allowed per 10,000 square feet of building area. iii. Cross docks, where loading docks are situated along two (2) walls of the same building, shall not be permitted.
Page 1 of 3
AGENDA ITEM – 3D
MEMORANDUM
DATE: July 8, 2026
TO: Planning Commission Chair and Commissioners
FROM: Jake Reilly, Community Development Director
SUBJECT: Planning Case #26-018 – Public Hearing Required
Applicant: City of Arden Hills
Request: Ordinance Amendments to Chapter 13 – Zoning Code Section 1320.16
Requirements for Affordable Housing (Public Hearing Required)
Commission Should Consider
The City of Arden Hills is proposing amendments to City Zoning Code Chapter 13 within Section
1320.16 Requirements for Affordable Housing to clarify where Section 1320.16 applies. These
amendments are considered a housekeeping amendment to provide clarity. The Planning
Commission should review and consider the proposed ordinance amendment. During the
discussion the Commission should also consider any public hearing testimony related to the
ordinance.
Background
On April 27, 2026 the Arden Hills City Council, upon recommendation by the Planning
Commission, adopted Ordinance 2026-007 amending Chapter 13, Zoning Code to add Section
1320.16 – Requirements for Affordable Housing to identify when and how affordable units may
be required to be included in new housing developments and in rehabilitation of existing housing
units, including regulatory incentives and provisions for enforcement.. As stated in staff reports
and in meetings, those affordable housing provisions were not intended to be applied to the TRC.
Upon further review, the City Attorney recommends that language memorializing that intent be
added to for clarity. A draft ordinance is included as Attachment A.
The attorney recommends the following amendments to Subd. 5. Applicability.
Subd. 5. Applicability.
A. This ordinance applies to the following development types as follows:
Page 2 of 3
1. New multifamily residential developments creating 20 or more dwelling
units.
2. Mixed-use developments with a residential component of 20 or more
dwelling units.
3. Substantial rehabilitation or reconstruction of existing buildings
containing 20 or more dwelling units.
4. Conversion of non-residential buildings to residential use creating 20 or
more dwelling units.
5. Those developed on property purchased from the City of Arden Hills
unless a waiver is approved by the Arden Hills City Council.
6. The development must comply with this inclusionary housing ordinance as
amended and approved by the city council as of the date the development
enters into a development agreement with the city.
7. Properties within the TCAAP development Plan Area, as defined in the
TRC, are exempt from this ordinance.
Notice
A Zoning Code Amendment requires a public hearing. Notice was published in the Pioneer Press
on June 26, 2026. The city has not yet received any public comments regarding this case.
Findings of Fact
The Planning Commission has an advisory role regarding proposed ordinance changes. Staff offers
the following findings for consideration:
1. The City of Arden Hills is proposing to amend ordinance language to clarify the
applicability of Ordinance 2026-007 to the TRC.
2. The proposed ordinance will include amendments to the language of Chapter 13 – Zoning
Code, Section 1320.16.
3. The City Council approved Ordinance 2026-007 amending Chapter 13 Zoning Code on
April 27, 2026.
4. As stated in the record, the intent and purpose of said ordinance is to provide a requirement
for affordable housing in new residential developments in areas of Arden Hills not
regulated by the provisions of the TRC.
5. The proposed ordinance amendment is consistent with the City’s Comprehensive Plan.
6. There is an adopted comprehensive plan policy and goal to require affordable housing at
Rice Creek Commons:
a. The City of Arden Hills 2040 Comprehensive Plan (2019) Land Use Chapter states,
“Future development of TCAAP shall be subject to a term sheet for development to
be known as Rice Creek Commons in order to meet the goals of the Comprehensive
Plan with a requirement that 20% of housing units in the development must be
affordable at 60% of Area Median Income or less.”
b. The Comprehensive Plan guides 15.9 acres at Rice Creek Commons at sufficient
density to accommodate at least 373 units of housing affordable to those with incomes
at or below 80% AMI.
7. Amendments to the Zoning Code regulations require a public hearing prior to action by
the City Council.
Page 3 of 3
Options and motion language
• Recommend Approval: Move to recommend approval of Planning Case 26-017 as
presented (or as modified by Planning Commission) for Zoning Code Amendments to
Chapter 13 – Zoning Code, Section 1320.16 of the Arden Hills City Code to modify
language to provide clarity regarding affordable housing development at Rice Creek
Commons as discussed in the July 8, 2026 Report to the Planning Commission.
• Recommend Denial: Move to recommend denial of Planning Case 26-017 as presented for
Zoning Code Amendments of Chapter 13 – Zoning Code, Section 1320.16 of the Arden
Hills City Code to modify language to allow to provide clarity regarding affordable housing
development at Rice Creek Commons: findings to deny should specifically reference the
reasons for denial.
• Table: Move to table Planning Case 26-017 as presented for Zoning Code Amendments to
of Chapter 13 – Zoning Code, Section 1320.16 of the Arden Hills City Code to modify
language to provide clarity regarding affordable housing development at Rice Creek
Commons: the Planning Commission should identify a specific reason and/or information
request should be included with a motion to table.
Budget Impact
N/A
Attachments
Attachment A: Draft Ordinance Amendment
ORDINANCE NO. 2026-0XX
CITY OF ARDEN HILLS
RAMSEY COUNTY, MINNESOTA
AN ORDINANCE AMENDING CHAPTER 13, SECTION 1320, SUBSECTION 1320.16
OF THE ARDEN HILLS CITY CODE CONCERNING REQUIREMENTS FOR
AFFORDABLE HOUSING
THE CITY COUNCIL OF THE CITY OF ARDEN HILLS, MINNESOTA, ORDAINS:
SECTION 1. Chapter 13 – Zoning, Section 1320 – District Provisions, Subsection 1320.16 –
Requirements for Affordable Housing, is hereby amended by adding the below underlined
language and removing the struck language.
Subd. 5. Applicability.
A. This ordinance applies to the following development types as follows:
1. New multifamily residential developments creating 20 or more dwelling units.
2. Mixed-use developments with a residential component of 20 or more dwelling units.
3. Substantial rehabilitation or reconstruction of existing buildings containing 20 or more
dwelling units.
4. Conversion of non-residential buildings to residential use creating 20 or more dwelling
units.
5. Those developed on property purchased from the City of Arden Hills unless a waiver is
approved by the Arden Hills City Council.
6. The development must comply with this inclusionary housing ordinance as amended and
approved by the city council as of the date the development enters into a development
agreement with the city.
7. Properties within the TCAAP development Plan Area, as defined in the TRC, are exempt
from this ordinance.
SECTION 2. This Ordinance shall become effective immediately upon its passage and
publication according to law.
PASSED and ADOPTED this __th day of [Month], 2026, by the City Council of the City of Arden
Hills, Minnesota.
CITY OF ARDEN HILLS
By _______________________________
David Grant, Mayor
ATTEST:
_____________________________
Julie Hanson, City Clerk
Page 1 of 1
AGENDA ITEM – 4A
MEMORANDUM
DATE: July 8, 2026
TO: Planning Commission Chair and Commissioners
FROM: Jake Reilly, Community Development Director
SUBJECT: Accessory Dwelling Units Draft Ordinance Update
Requested Action
A verbal update will be provided at the Planning Commission meeting, along with an updated
draft. The Planning Commission will formally review an updated draft at a later meeting.