CITY OF ARDEN HillS
4364 WEST ROUND LAKE ROAD
ARDEN HILLS, MN 55112-5794
AGENDA
CITY COUNCIL MEETING, CITY HALL
**MONDAY, AUGUST 28, 2000, 7:30 P.M.**
7:30 P.M. 1.
7:30 P.M. 2.
. 7:30 P.M. 3.
7:40 P.M.
.
City Philosophv
To providc a basic and necessary scope of quality services
through thc innovative and purposcful use ofresources.
-1
J
11
!
THE REGULAR MEETING OF THE
ECONOMIC DEVELOPMENT AUTHORITY (EDA)
HAS BEEN CANCELLED.
Call to Order
Approval of Meeting Agenda
Approval of Minntes
a. August 14, 2000 Regular Council Meeting
b. August 15, 1999 Special Council Meeting
c. August 21,2000 Closed Exccutive Session
d. August 21,2000 COilllcil Worksession
4.
Consent Calendar
Those items listed under the Consent Calendar are considered to be routine by the City
Council and will be enacted by one motion under a Consent Calendar format. There \\'ill be
no separate discussion of these items, unless a Council member so requests, in which event,
the item will be removed from the general order of business and considered separately in its
normal sequence on the agenda.
a. Claims and Payroll
b. 2000 Busincss License Renewals
c. Res. #00-26, A Resolution Requesting Ramsey County to
Restrict Parking Along a Portion of County Road I
d. County Road E, Light Standards
1. Authorization to Repair Existing Light Standards (in an
amount not to exceed.)
2. Chargc to Operations and Finance Committee and
Planning Commission, Study of City Light Standards
PHONE: (651) 633-5676 . FAX (651) 633-7839
AGENDA - PAGE TWO
CITY COUNCIL MEETING, CITY HALL
MONDAY, AUGUST 28, 2000 7:30 P.M.
.
7:45 P.M.
5.
Public Comments
This is an opportunity for citizens to bring to the Council's attention any items not currently
on the agenda. In addressing the Council, please state your name and address for the record,
and a brief summary of the specific item being addressed to the Council. To allow adequate
time [or each person wishing to address the Council, we ask that individuals limit their
comments to three (3) minutes. Written documents may be distributed to the Council prior
to the meeting, or as bench copies, to allow a more timely presentation.
7:50 P.M. 6. Unfinished and New Business
a. Planning Casc #00-17c, United Properties, 1998 and 1987
Gateway Blvd., PUD Amcndmcnt
b. 2000 Pavement Management Program (PMP)
1. Ingerson Neighborhood Revicw Group, Receive Final
Recommendations
2. Receive Staff Recommendations
3. Schcdule Public Informational Meeting
c. Final Pay Request, 1999 Sanitary Sewer Project, Lametti
and Sons .
8:20 P.M. 7. Administrator Comments
8:30 P.M. 8. Council Comments and Committee Activity Reports
9:00 P.M. 9. Adjourn
The above times may vary depending upon length of issue discussion.
.
. .
.
We, residents of Arden Hills, are requesting the City to continue the many year
tradition of having a Skatinq Rink at Valentine Park. We believe the Rink is an
important neighborhood asset that will be stror]gly supported by the residents.
Name Address Daytime Telephone
TF . .... ..... . ij6..'~V"....J:(d\J.- ...,al
. JG, 1- +- LAl<'L V(rl--!lI;1f I/.Ji. ~. 0S'{ - 22)"-- (~37-
I & S-( Lzk / /JpJ~ VCc{ &:;;; ~ iP 3 t -w.~
("I 1 J C'-.~p--.~ (~?><:G,7'J -"6? G r
/165 [Ie.' b,::;7-{,3 - of?
(/f<; Lie:, <15 J I t.3J -0/;/
/ 74-'-- G/~':r/JI.~..J-,'C (6S'/ {;>{'-~1 /L'/
bJj- Lff;;/
A J/ b'SlC- ?3/- 36'15
-0306
fr ---J~77
. &<;I-/..- 33 -tl'?:7
(5(-0' 64-0&S0'
1- ~> 3~- -0
~;-J - {,M - 'b tl ~ if
(. j;~. 7 t3' z. Z/
1o~~/_~S3 7a~
(Lf 0.0. ~{) (b)
?;, ~~
.
,
,.
. We, residents of Arden Hills, are requesting the City to continue the many year
tradition of having a Skatinq Rink at Valentine Park. We believe the Rink is an
important neighborhood asset that will be strongly supported by the residents.
Name
Address
Daytime Telephone
rrr
"II /
ok'.- iJ1'(fui (, /('
,1!,,' ,/' I/"
o lei! ~~" (pv)'u /'fY---~'
c-~:l~ C q ) 1 k~ ~'C~)"JtJ1eAc6 f\_
,I,
6L 1!ISCOlT L/)^J6UE
D(\, ii'~O CfiZ tt
c J~ ( L (L. 0
~ / . If
/. r.! ( I ' ..',,' /I..rt./
. "'<""'" . '-UII1 &1///",,) !; c.~
Ii
&3 3' '-1 Lj J J-..
/ i
\ \
; I
h LE/'JVI~Lu cr
~lWN
lKSl G, ~~~l8
C,3/-30'(S
(.J) ,- oG J~J"
0..-) 0 QJ)_d2 LJ'YS
~
-;1
I); /1 A -1-1
;;\ .!vlaJIL '
ili
"1
:1,
;i'
HI
111
IH
(0
LIe
.
CJ, . 0,1\ J...:-
n.o..~
iji
j,!
~ ; 1
;!.'
1 ~ ;
; ~ I,
lP
;11
Hi
il;
Hi
'11
il!
;;1
Iii
Jjl
,'-I
';.i:
, .
.
Ii!
~ i i
IP
.ji!
Ii;
!!i
"
.
We, residents of Arden Hills, are requesting the City to continue the many year
tradition of having a Skatinq Rink at Valentine Park. We believe the Rink is an
important neighborhood asset that will be strongly supported by the residents.
Name
'\
o\<"'m \ .
., :\
Address
\ C) \A
OVCV1V,'7 Ave &5 k
1707 Glen\! r€-w Ave
1'14& \bus ~
r ('
~"':\& ( ") :H Q L:J/ 1-; VI 12
C~ULL'I) !ii~(lr~r1 TIIl(J(\.
0\, iUllm ~
b~ 1114;e~ .
]1: (f"iQ l,e k.)
:1:
(."SJ &3'6.QY<l7
3jt/~ J!.j/,;, 0 ihils I2cL
,
0,;)/- &()~ -1);0 7
Ok
() ~ "..
".
1j!
01,( 'I:
-. ol~
oj(
oK..
OIL
371<1
'11 v V!'-fJ ,N
I\~ {{ VI~lY A \..r
Io.r / b l / / '7 'j
'3'773
1~3'1 VW(/$; .;JH.
(d
C -,. I - G '3 b - 0;; ;>J-
(;, $-;- (f2'l-09s-'/
iii\dl
'd'-j\ ", '
J'{i I- ./ I
iiii, '/')
'\ 11/ .'
;;T v
6)' - /oOd
&5/ b ,i h - /::L 79
05/-6-31- ~.f:,
[I
"1
iij
\,~ c.[),,\) c~
~~~
:ii
ill
iii
)\1
1 ~ I
'iil
iH
'"
1::
. ]j:
:!i
.
;;i
Hl
1:1
11:
!1"
,';,
. .
.
.
We,. :esidents ~f Arden Hills, are requesting the City to continue the many year
tradition of having a Skatinq Rink at Valentine Park. We believe the Rink is an
important neighborhood asset that will be strongly supported by the residents.
Name
Address
Daytime Telephone
TT!
ii! '~
h ~ / jft' iJ! t<-<.AJ..
ijl
b' ~~ .
~~~ (loll!! . .A>-e~ lJerll<l' .
'.1'
i'l ~;JIv"
D
/ I r7 G / &Ii/{ '4..0 kx
liSg" ~~~ c;:
\ 7 S! ((' J .~
/'14 &t6Mv,e...-; flsYL
(., f? - ;)J. 7 -(;, I':J.,
t~~~~~~
b 1-~o"'2?
38- 144
oK
oL
OK
c.~~[L
"..,,S
floE~
\ 0 r. D. .~o::f:
',L-\,~
08/25/00 FRI 09: 07 FAX 6t26.137839
City of Arden Hills
141 001
*********************
~
I
**:i:
TX REPORT
?:=:Z
********:~************
TRA:\SMISS10N OK
TX/RX :\0
CONNECTION TEL
CONNEcn01\ ID
ST. TBIE
USAGE T
PGS. SENT
RESlILT
3316
4821262
08/25 09:06
00'54
2
OK
.
.
08/25/00 FlU 08: 02 FAX 6t26337838
City of Arden Hills
i4J 001
*********************
***
TX REPORT
***
$$$*$$$*$$***$*$$****
I.
TRANSMISSION OK
TX/RX NO
CONNECTIO:\ TEL
CONNECT I ON ID
ST. T1ME
CSAGE T
PGS. SENT
RESeLl'
3311
6124218511
08/25 08:01
00'50
2
OK
.
.
08/25/00 FRI 08:09 FAX 6126337838
City of Arden Hills
I4i 001
I
~*$******************
:i:*$
TX ImpORT
:!:**
*********************
~
I
TRA'iSlll SS I ON OK
TXlRX :\0
CONNECTION TEL
CONNECTlO!\ lD
ST. TIME
USAGE T
PGS. SENT
RESULT
3.31 ()
6461220
KMWB W1l23 MPLS II
08/25 08:58
00'49
3
OK
.
.
08/25/00 FRI 08:58 FAX 6126337838
TRANSMISSION OK
TX/RX ,0
CO,NECTION TEL
CONNECTION I D
ST. T DIE
l'SAGE T
PGS. SENT
RESULT
.
.
City of Arden Hills
4!J 00 t
*********************
***
TX REPORT
*$:::
***s*****************
3308
6123701378
08/25 08:57
00'50
3
OK
08/25/00 FRI 09:05 FAX 6126337839
.
.
TRANSIII SSION OK
TX/RX NO
CONNECT! 01\ TEL
CONNECTION ID
ST. TIllE
tlSAGE T
PGS. SE:\T
RESULT
City of Arden Hi l1s
IiZI 001
*********************
***
TX REPORT
:t:**
*********************
3314
4810551
08/25 09:04
00'48
2
OK
08/25/00 FRI 08:06 FAX 6126337839
.
.
TRANSMISSION OK
TX/RX 'l0
CONNECTIO~ TEL
CO:\NECTION ID
ST. TIME
l"SAGE T
PGS. SENT
RESCLT
City of Arden Hills
411 001
~~~**s***************
:j;**
TX REPORT
*1]:*
*********************
3315
6512278371
08/25 08:05
00'41
2
OK
08/25/00 FRI 09:10 FAX 6126337839
TRANSMISSIO'i OK
TX/RX NO
CONNECT! OK TEL
CONNECTION ID
ST. TIME
CSAGE T
PGS. SENT
RESCLT
.
.
City of Arden H.ills
~OOI
I
:~********************
$$:!:
TX REPORT
**:\=
*********************
3313
6333846
08/25 09:09
01'26
2
OK
08/25/00 FRI 09:13 FAX 612633783B
Cjty of Arden Hills
I4i 001
I
***************************
*:i:*
ERROR TX REPORT
***
***************************
~
I
TX FC;;CTION WAS NOT COMPLETED
TX/RX '10
CONNECTION TEL
CONNECTION ID
ST. TIME
lTSAGE T
PGS. SEj\T
RESlTLT
3312
7637060891
09:12
08/25
00'00
o
NG
~018
.
.
1l8/25/00 FRI 09:31 FAX 6126337839
City of Arden Hills
~ 001
*********************
*"* TX ImpORT .,.,.,.
*********************
~
I
TRANSMISSIO'i OK
TX/RX NO
CONNECTlO!\ TEL
CONNECTION ID
ST. TIME
USAGE T
PGS. SENT
RESULT
3317
61270lill891
D8/25 OA:3D
OO'4t
2
OK
.
.
.
.
.
CITY-OF-AROJ9l-IIlLLS, MINNESOT ,\
CITY COUNCIL MEETING
AUGUST 14,2000
7:30 P.M. - ARDEN HILLS CITY COUNCIL CHAMBERS
BR-AFT
CALL TO ORDER/ROLL CALL
Pursuant to due call and notice thereof, Acting Mayor Gregg Larson called to ordcr the
regular City Council meeting at 7:30 p.m.
Prescnt:
Councilmcmbers Bcverly Aplikowski, David Grant, Gregg Larson, and
Lois Rem.
Absent:
Mayor Dcnnis Probst.
Also present wcre City Administrator, Joe Lynch; Public Works Director, Dwaync
Stafford; City Enginccr, Greg Brown, BRW; City Planner, Jennifer Chaput; and
Recording Secretary, Mary Mullen.
ADOPT AGENDA
MOTION:
Councilmember Aplikowski moved and Councilmember Rem seconded a motion
to adopt the agenda for the August 12,2000, regular City Council mccting, with
the following change:
Under Item 7, Unfinishcd and New Business, inseli Item 7B, 2000 Sealcoating
Project, before Item 7 A, Plarming Cases.
The motion carried unanimously (4-0).
APPROVAL OF MINUTES
A. July 31, 2000 Regular Council Meeting
Councilmember Grant requestcd thc following change: On page 4, 3rd paragraph, 3rd line,
replace "whenever they wish" with "on whatever day they prefer".
Councilmember Rem requested the following changes: On pagc 1, under Roll Call, note that City
Attorney Jerry Filla was present. On page 16, Under Item E, Wcbsite Development Task Force,
2nd paragraph, 2nd line, rcplacc "complete" with "available". On page 21, 6th paragraph, 2nd
and 3rd lines, replace "the Mayor, Mr. Kelliher. . ." with "Mr. Kellihcr, thc Mayor. . .".
MOTION:
Councilmember Grant moved and Councilmcmber Aplikowski seconded a motion
to approvc thc meeting minutes of the July 31, 2000 Regular Council Meeting, as
amended. The motion carried unanimously (4-0).
A R.DENHIUjSCITY COUNCIL - AUGUST 14,_2DOO
?
CONSENT CALENDAR
A.
B.
C.
Claims and Payroll
Appoint Election Judges for Primary Election
2000 Business License Renewals
.
MOTION:
Counci1member Grant moved and Councilmember Aplikowski seconded a motion
to approvc the Conscnt Calendar and authorize execution of all neccssary
documents contained therein. The motion carried unanimously (4-0).
PUBLIC COMMENTS
Acting Mayor Larson invited those present to come forward and address the Council on any
items not alrcady on the agenda.
There were no publie comments.
UNFINISHED AND NEW BUSINESS
A. 2000 Sealcoating Project, Allied Blacktop
Mr. Brown explained that two actions were required by the Council with regard to the 2000
Sealcoating Project. He stated that Change Order #1 pertains to additional work requested by the
Council at Trinity Lutheran Church parking lot and the Lake Joharma Fire Department parking .
lot. He addcd this change increascs the contract amount by $8,323.64.
Mr. Brown stated that Paymcnt Request #1 is for final payment on the contract in the amount of
$48,886.14. He added that thcre was no retainagc as work was done in conjunction with City
staff.
Councilmember Grant asked whether City staff were pleascd with the work that was done. Mr.
Stafford confirnled that the project turned out well, adding that the contractor changed the
scbedule to accommodate National Night Out as well as a delay in the removal of a boat trailer
parked in the street. He added that response from residcnts has been positive.
Acting Mayor Larson stated that this projcct was discussed briefly at thc Plarming Commission's
last meeting, where positive feedback was expressed by Commission members who thought the
new material uscd was superior to that which was used in previous years.
Councilmember Rem stated that several residents had expressed their appreciation of the way the
project was handled and the end result.
MOTION:
Councilmember Aplikowski moved and Councilmember Grant seconded a motion
to approve Change Order #1 and Pay Estimate #1 (Final Payment) for Allied
Blacktop Co., Maple Grove, Minnesota, in the amount of $48,886.14. The
motion carried unanimously (4-0).
.
e
.
e
ARDENHIL~CTTY COUNCIL - AUGUST 14, 2ilQQ
.,
B. Planning Cases
1.
Case #00-11, City of Arden Hills, Ordinance Amendment
Ms. Chaput explained that in response to resident complaints, staff has identificd some portions
of thc Zoning Ordinance that rcquirc rcvision in order to properly address complaints. The
revisions are a result of researching other cities' ordinanccs as well as staff and Plarming
Commission discussions.
Ms. Chaput stated that the recommendations of the Planning Commission came before the City
Council on July 31, 2000. At that time, the City Council tabled discussion of the amendments.
Sincc that time, the City's planning consultant had been consulted on the dcfinition of "family"
as it is used in othcr cities and some additional rccommendations were made.
Ms. Chaput reviewed amendments to Section II (D), Definitions, with rcgard to Item 1,
pertaining to single family homes that are being used as student housing. Ms. Chaput also statcd
that Councilmembcrs have been prcscnted with a handout, outlining the definitions used for
"family" by thc Univcrsal Building Code, thc City of Rose vi lie and the City of Shoreview, all of
which are similar to what is being proposed.
Thc City has had a number of complaints on single family homes that havc been converted into
housing for numerous students attending the local colleges. The current codc does not have any
languagc in it to deter this type of activity, essentially allowing multifamily dwcllings in singlc-
family zoning districts. Following discussions with the City's planning consultant, it was also
recommended that thc dcfinition of "household" be amended since it did not match the other
definition amendments being proposed. Some additional language has also been added to the
definition of "family" in order to address state law regarding group homes, as recommended by
the City's plarming consultant.
Councilmember Aplikowski asked how the amendmcnt would affect the status of group homes.
Ms. Chaput stated that there is a definition for a group facility in a residential setting, adding that
this falls under State law and as such would be subject to State regulations.
Shannon Johnson, 1902 Noble Road, stated she lives next to a home which is rented to students.
She added there are currently eleven students living in the home which, in her opinion, is
excessive. She expressed concern that the garbagc at the home might attract dogs and raccoons.
Ms. Johnson stated that every student has a vehicle, and thcre arc nine to twelve cars parked in
the drivcway cvery morning. She added that when the students have friends over, there are cars
parked up and down the street. She expresscd frustration over the number of vehicles in the
driveway. She noted that the students are friendly and quiet.
Ms. Johnson stated that parking is the main issue, adding that if the City limits thc number of
people living in a home, that would solvc the problem.
Ferdinand Peters, 1708 Portland Avenue, St. Paul, stated hc is an attorney representing Jerry and
Julie Warner, the owners of the home on Noble Road which is currently rented to students. He
addcd that his clients feel the ordinance amendments have been generated because of thc
."~RDEN HILLS CITY COUNCIL A TTGTTST 14, )000 4
Warner's property although it has Citywide implications. He notcd that if the amendments are
adopted, it will severely restrict his client's use of their property. e
Mr. Peters statcd that the issues raised by Ms. Johnson should bc brought directly to the
Warner's as the owners of the property to give them an opportunity to address the problems. He
added that the phrase "on a regular basis" in the section pertaining to drivcways is vague.
Mr. Pcters stated that his clients havc applied for all the neccssary permits with regard to thc
changes made to their property, and have attemptcd to accommodate parking. He added that he
has checked with the sheriff who confirmed that no report has ever been made against the
property .
Mr. Peters stated that other conununities allow five unrclatcd people in a dwclling. He expressed
his client's opposition to any definition that limits the use oftheir property. He addcd that
studcnts should be integrated into the community.
Leon Godeke, 1895 Noble Road, stated he lives across from the homc bcing discussed, adding
that the homeowner lives in Pine City. He expressed doubt that the Warner's would be willing to
drivc to the home if telephoned. He added that thirteen cars were parked in the drivcway until
midnight one night, and one car used his driveway to turn around. He stated that all the residents
on the street might decide to rent their homes out, which would greatly affect the neighborhood.
Dick Wenzel, 1931 Noble Road, statcd he has never had a problem with the home, although he
does not live next door. He added, in his opinion, that City ordinances in general are not .
enforced. Acting Mayor Larson stated that City staff deal with ordinance violations on a
complaint basis.
Councilmember Rem stated that the Noble Road neighborhood had mobilized effectively in
opposition to this particular home being used as a rental property, adding that it is not the only
neighborhood in the City with such a complaint. She noted that there had been some discussion
among City staff with regard to efforts to ensure that neighborhoods are made aware of such
ordinances.
Councilmember Rem stated that the ordinance amendments are intended to put a reasonable limit
on residential properties to make them tolerable to other residents.
Jerry Warner, owner of 1898 Noble Road, stated both his daughters live at thc property and are
available if the neighbors havc complaints. He added hc understands that parking is a problem,
and hc has provided sufficient parking. Hc noted that he is unable to regulate the street parking
ofthe students' friends.
Joelle Warner, 1898 Noble Road, stated her father owns the home and she lives there with hcr
sister and several renters. She added that the neighbors on the strcet know her and her sister, and
are welcome to bring complaints to them.
Councilmember Grant stated that the definitions of single-family, two-family, and multiple-
family dwellings are unclear and should be more clearly defined.
e
e
e
e
ARDEN HILLS CIT-Y~AUGUSI-lA,2DDD
5
Councilmember Aplikowski asked for clarification with regard to the nmnbcr of entrances to the
home at 1898 Noble Road. Mr. Warner stated the home is a split entry with one main entrance,
and a locked door leading to the lower unit. Mr. Godeke stated it is a regular split entry home.
Councilmember ApIikowski expressed concern with regard to the definition of "family". She
stated she would prefer that the definition specify that five unrelated people are acceptable rather
than four.
Councilmember Grant stated that the definition is confusing, as it appears that no more than four
people are allowed. Ms. Chaput stated that four peoplc refers only to unrelated people. She
added the number of related pcoplc is not limited.
Councilmember Grant asked whether Mr. Warner's two-family dwelling would be allowed to
have ten people ifhe has two daughters and four renters in each unit. Ms. Chaput stated that four
unrelated people would be allowed in cach household as well as an unlimitcd numbcr of pcoplc
related by blood.
Councilmember Aplikowski stated that ifthe sisters live in separate units, they could each have
three unrelated roommates. She added if the house is considered a single family dwelling, the
sisters could have four unrelated roommates.
Acting Mayor Larson stated that the problem of converting homes to student housing is a
problem throughout the City, adding that Mr. Warner's property is onc such homc and should bc
separated from thc issuc as a whole. He added this issue has been before the Council several
times as many residents are concerned with how student housing affects neighborhoods and
property values.
Acting Mayor Larson stated that, in his opinion, four unrelated people is a reasonable number.
He added the Plarming Commission recommended it as reasonable, and expressed his agreement
with their recommendation.
Acting Mayor Larson stated he reviewed the zoning ordinance and found only two instances of
the use of the definition for "household". He addcd that he would suggest deleting the definition
for "household" and inscrting "See Fan1ily", which would accomplish the same end and would
he less confusing.
Councilmember ApIikowski stated that the definition of "household" was includcd to explain
why it was used in the definition of "family". Councilmember Rem stated thc definition of
"household" tends to be more inclusive than the definition of "family".
Acting Mayor Larson stated, with regard to the definition of "family", that two categorics arc
possible: all people in the home are related, or the home contains some unrelated individuals.
Councilmember Grant expressed agreement with that interpretation, adding it seems restrictive.
Ms. Chaput stated that the wording could be changcd to clarify that all the residents need not be
rclated.
COlmcilmember Aplikowski asked whether there are currcntly other neighborhoods within the
City with similar rental properties. Ms. Chaput confirmed there are other homes rcntcd to
students. Councilmcmber Rem stated thc issue arose because of a home in her neighborhood
--ARDEN HILLSCL1YCOUNCIL-=-AUGUST 14, 2000--
_____~__------D
which was going to be sold for the purpose of converting it to a multiple family use, and
residents came to the Council. She addcd that the Council had fclt it was worth addressing thc
Issue.
.
Acting Mayor Larson statcd that the property to which Councilmember Rem referred was located
in an R-l zoning area. Mr. Godeke asked for clarification with regard to zoning districts. Ms.
Chaput stated that Noble Road is located in an R-2 zone, which allows single and two-family
uses.
Katic Nelson, 388 Bucher Avenue, Shoreview, stated she currently lives in a home converted for
students, and noted that most complaints are related to garbage and parking. Shc added that the
allowed number of unrelated people should be raised.
Councilmember Aplikowski proposcd a motion pertaining to Item I. Mr. Lynch stated it would
be ncccssary to determine whether the amendments should be adopted individually or as a whole.
Acting Mayor Larson stated he would not support the motion. He added that, in his opinion, four
unrclated people is sufficient.
Councilmcmbcr Grant asked whether, in the Mayor's absence, the voting on the motion would
require a four/fifths majority. Mr. Lynch confirmed that a super majority would be required. He
added that the ordinancc amendments should bc adopted as a whole and not section by section.
Councilmember Rem agreed, stating the amendmcnts were put forward as a single planning case. .
Ms. Chaput stated that the Council's recommendations would be incorporated into a fOllnal
document for approval at the Council's next meeting.
Ms. Chaput reviewed amendments to Section II (D), Definitions; Section VI (A) #5, Sizc; and
Section VI (F) #1 h, Parking Structures, with regard to Item 2, pertaining to accessory structures.
The definition for "building, accessory" is not inclusive of all structurcs. Since there are
rcstrictions on acccssory buildings, it should be clearly defined. Also, there is no limit on the
amount of accessory structures pcrmittcd. The accessory structure sctbacks are in conflict in
somc scctions (10' for accessory but some principlc structures only require a 5' setback) so this
languagc is proposed to be amended. Finally, the term "parking structure" is not defined in the
code so it has been amendcd for "private garage" which is defined.
Mr. Wcnzel asked whether a fishhouse would be considcred an accessory structure, adding he
has a neighbor with six fishhouses in his back yard. Ms. Chaput confirmed it would be
considered an accessory structure.
Ms. Chaput rcviewed amendments to Section VI (F) #3, Traffic and Circulation, with regard to
Item 3, pertaining to accessibility to public streets. It is not clear in the ordinance that all newly
created properties nced to abut a public street. The only information that is provided does not
refer to all districts.
.
Ms. Chaput reviewed amendments to Section VI (F) #1 C, Construction Standards, and Section
VI (F), #3 C, Driveways, with regard to Item 4, pertaining to driveways. The number of
e
.
e
ARDEN HILLS CITYCOUNCILAUGUST 14,2000
7
driveways or cUTb cuts for a residential property is not limited. There are no requirements to
pave driveway surfaces, setbacks to a driveway or permitted parking locations on a lot.
Complaints rcgarding the numbcr of vchicles on a propcrty at one time are addressed by limiting
the number of vehicles permitted outside of a garage. Other cities were rcscarchcd specifically
on this issue and it was found that it was generally dealt with by limiting thc width of a driveway
which in turn limits the number of vehicles that can park at any given time. Generally, cities
havc a minimum (not maximum) number of spaccs rcquired of two per dwelling unit. The
proposed numbcr of a maximum of three cars on a driveway was a result ofP1anning
Commission discussion and the proposed number has not changed from further rescarch.
Finally, State and County regulations for streets should be confirmed with these regulatory
bodies at that time and the code should not list their rcquirements, in thc case that they have
changed or arc incorrect.
Mr. Peters stated that changcs to this scction would havc a major affect on his client's use of his
property. He addcd the garage on the property had been convertcd to a study area and the
driveway widened with the necessary permits. He noted the amendment should be broadencd to
take multiple dwelling units into account.
Councilmember Aplikowski stated that some property owneTS have circular driveways. Ms.
Chaput stated they can remain until the driveway is changed in some way. She addcd the
amendment is intended to provide limitations to prevent such uses from occurring in the future.
Councilmember Aplikowski stated that lots of a certain size might be able to accommodatc more
than one access. She added, in her opinion, the City should not restrict that. Ms. Chaput
reitcratcd that there are currcntly no restrictions at all.
Councilmember Rem stated that points of street access was the concern, adding that large lots
don't necessarily need two entrances. She added the amendments are not intcnded to limit
rcsident's preferences.
Councilmember Grant stated that many homes have landscaping rock which is used for parking
purposes. He asked for clarification with regard to the term "directly into a garage" to dcfine
parking areas. Ms. Chaput agreed that it would not make sense iftherc was no garagc on thc
property and it should be changed accordingly.
Acting Mayor Larson stated that the word "those" should be replaced with "these" under
"Construction Standards". He agreed that the term "directly into a garage" is not necessary. He
added he is comfortable with the limit of three vehicles in the driveway, but agreed this could bc
a problem for multiple family dwellings.
Mr. Lynch statcd, with regard to voting on the ordinance amendments, that the Planning
Commission prcpared the ordinance changes with recommendations for adoption, and must be
adopted by a four/fifths vote of all members of the Council.
Councilmember Aplikowski stated that numerous residents do not have paved driveways, adding
she is unwilling to impose restrictions on residents who are not causing any problems. She
ARDEN HILLS CITY COUNCIL - AUGUSTI4, 2000
8
expressed concern that the Council is attcmpting to appcasc a few complainants by restricting the
entire community. .
Acting Mayor Larson stated that the City will not require properties which currently do not meet
the requirements to be in immediate compliance. Ms. Chaput agreed, adding that residents will
be required to conform when they attcmpt to improvc that portion of the property that is being
affccted.
Ms. Chaput reviewed amcndments to Scction VI (E) #4 D, Barbs or Spikcs on Fences, with
regard to Item 5, pertaining to fences. The City does not have any agricultural districts, yet there
arc regulations for agricultural fences and agricultural uscs. From a planning perspective,
encouraging agricultural uses do not meet the intentions of the Comprehensive Plan.
Councilmember Aplikowski asked how businesses would be affected. Ms. Chaput stated they
would be required to obtain a Special Use Permit for their electric or barbed fenccs.
Ms. Chaput reviewed amcndments to Section IX (H), Amortization of Nonconforming Use, with
rcgard to Item 6, pertaining to amortization. In the 1999 Legislative Session, the City's powcr to
amortize land uscs was revoked, as stated in Chapter 96-S.F. No. 854. The only uses that a city
may amortize are thosc rclating to, " . . . adult-only bookstorcs, adults-only theatres, or similar
adults-only business as dcfined by ordinance. . ." and for ". . . the prevention or abatement of
nuisances. . . or eliminating a use determined to be a public nuisance. . .". Therefore, thc
language that is cillTently in the Zoning Ordinance regarding amortizing nonconforming uses
should be revised.
.
Acting Mayor Larson stated he had raiscd the issue of omitting the statute language in case it
might change. He added that he was attempting to refercnce the fact that the City can amortize
whatcver is allowed to be amortized, but not that the City has the authority to enact an ordinance.
He noted he would prefer to retain the amendment as originally written.
Ms. Chaput reviewed amendments and renumbering of all pagcs, Sections and the Table of
Contents in the City of Arden Hills Zoning Ordinancc, with regard to Item 7, pertaining to thc
ordinance numbering system. The numbcring system of the ordinancc is currently in Roman
numerals and is difficult to follow. Staff proposes that this be changed for ease of use as well as
the page numbcring system, numbering pages from one (I) to the last page of the document.
Also, for ease of future revisions, the document should be placcd in a binder with section tabs.
MOTION:
Councilmember Aplikowski moved and Councilmember Rem seconded a motion
to approve changes to Item I of Planning Case #00-11, as outlined in the staff
memo dated August 2,2000, Dcfinitions of "dwelling", "dwelling unit", and
"family", with the following amendments:
Itcm 53. Family. Replace "four" with "five"; dclete "some or all of whom";
replace "are" with "who need not be".
.
Voting on the motion: Aplikowski, Rem and Grant voted aye. Larson voted nay.
The motion failed (3-1).
.
.
.
ARDEN HILLS CITY COUNCIL - AUGUST 14, 2000
9
MOTION:
MOTION:
MOTION:
MOTION:
MOTION:
MOTION:
Councilmember Aplikowski moved and Councilmembcr Grant seconded a motion
to approvc changes to Item 2 of Planning Case #00-11, as outlined in the staff
memo dated August 2, 2000, pertaining to Accessory Structurcs. The motion
carried unanimously (4-0).
Councilmember Aplikowski moved and Councilmember Rem seconded a motion
to approve changes to Itcm 3 of Planning Case #00-11, as outlined in the staff
memo dated August 2, 2000, pertaining to access to a public street. The motion
carried unanimously (4-0).
Councilmember Grant moved and Councilmember Aplikowski seconded a motion
to approvc changes to Item 4 of Planning Case #00-1 1, as outlined in the staff
memo dated Augnst 2,2000, pertaining to driveways, with the following
amendments:
Section VI (F) #l C, Construction Standards, replacc "Those" with "These"
Section VI (F) #3 C, Driveways, (7) Prohibited Areas, delete "leading directly
into a garage" and "on a regular basis"; rcplace "three" with "four"
Voting on the motion: Larson and Rem voted aye. Aplikowski and Grant voted
nay. The motion failed (2-2).
Councilmcmber Aplikowski moved and Counci1member Grant seconded a motion
to approvc changes to Item 5 of Planning Case #00-1 I, as outlined in the staff
memo dated August 2, 2000, pertaining to electric fences. The motion carricd
unanimously (4-0).
Councilmember Aplikowski moved and Councilmember Grant seconded a motion
to approvc changes to Item 6 of Planning Case #00-1 1, as outlined in the staff
memo dated August 2, 2000, pertaining to amortization. The motion carricd
unanimously (4-0).
Councilmember Grant moved and Counci1mcmbcr Aplikowski seconded a motion
to approve changes to Item 7 ofP1anning Case #00-11, as outlined in the staff
memo dated August 2,2000, pertaining to thc nunlbering system of the ordinance.
The motion carried unanimously (4-0).
Acting Mayor Larson stated that City staff has the approval necessary to proceed with five of the
seven proposed changes. Councilmember Aplikowski suggested the remaining changes might be
discussed at a worksession with the Planning Commission. Acting Mayor Larson stated thc City
Attorney's input would also have been helpful.
C. Hunters Park Request
Mr. Lynch stated the audience members had left the meeting but requested that the Hunters Park
Request portion of the agenda be held ovcr until the Council's next meeting. Acting Mayor
Larson asked whether it was necessary to act on the item. Mr. Lynch stated a delay would give
staff the opportunity to research thc situation further.
ARDEN HILLS CITY COUNCIL - AUGUST 14,2000
10
Acting Mayor Larson stated that thc Ingerson Task Force was scheduled for the Council's .
August 28 mecting, adding the Hunters Park Tequcst might be discussed at a meeting with fewer
agenda items. Councilmembcr Rem stated the tenant's organization should be notified that the
item had becn held over, and when it would be discussed.
Councilmember Grant statcd he is aware that affordable housing in the aTea is extremely limited.
COlillcilmember Aplikowski stated that affordable subsidized housing is necessary.
ADMINISTRATOR COMMENTS
Mr. Lynch reminded the Council of the special meeting to be hcld August 15 at 8:00 p.m. in
Council chambers.
COUNCIL COMMENTS AND COMMITTEE/COUNCIL LIAISON REPORTS
Councilmembcr Grant stated that the Parks & Recreation Committee will meet on August 22.
Councilmcmber Grant stated that the AMM'S Metropolitan Agencies Committee met to discuss
affordable housing. He added their upcoming meeting is scheduled for Thursday August 17 at
which water quality will be discussed.
Councilmember Aplikowski stated, in her opinion, it is not the City's responsibility to advocate
on behalf of the Hunters Park residents. She added a petition might be made to the County or .
another party.
Councilmember Aplikowski noted that two Plarming Commissioners, Marty Rye and Brent
Nelson, will be leaving, and thankcd them on behalf of thc COlillcil for their hard work.
Councilmember Aplikowski stated that the Newsletter Committee did an exccllent job on the
water quality report.
CounciJmember Aplikowski statcd she will attend the N\1M meeting to be held August 15.
Councilmember Rem stated the National Night Out on August 1 was a succcss, adding that the
Fire Department visited the neighborhoods.
Councilmember Rem stated the RAE met on August 7 and reviewed rcmediation updates.
Councilmember Rem stated the Turtleman Triathlon was hcld recently in Shoreview, all
proceeds from which will go to the Northwest Youth and Family Services.
Councilmember Rem statcd that a County budget proposal to cut diversion funding would
greatly affect thc Northwcst Youth and Family Services.
Councilmember Rem stated she has had positive comments from residents with regard to the
watcr quality brochure and Parks & Recreation brochure.
.
,
ARDEN HILLS CITY COUNCIL - AUGUST 14,2000
II
Councilmember Rem stated the Operations & Finance Committee is scheduled to meet Thursday
e August 17.
Acting Mayor Larson stated the Planning Commission met on Wednesday August 2. He added
therc was a discussion regarding thc Gateway business areas, as well as the antenna request. He
notcd both issues will bc presented to the Council at their August 28 meeting.
ADJOURN
MOTION:
Couneilmembcr Aplikowski moved and Counci1member Rem seconded a motion
to adjourn the meeting at 10:12 p.m. The motion carried unanimously (4-0).
Deunis Probst
Mayor
Joe Lynch
City Administrator
NOTICE OF MEETINGS
Thc next regular City Council mecting will be held Monday, August 28, 2000 at 7:30 p.m. at thc
Ardcn Hills Council chambers.
.
.
e
e
e
DRAFT
MINUTES
CITY OF ARDEN HILLS, MINNESOTA
SPECIAL CITY COUNCIL MEETING
AUGUST 15,2000
8:00 P.M. - ARDEN HILLS CITY COUNCIL CHAMBERS
CALL TO ORDERlROLL CALL
Pursuant to due call and notice thereof, Mayor Dennis Probst called to order a Special
Meeting of the Arden Hills City Council at 8:02 p.m.
Present:
Mayor Probst; Councilmembers Beverly Aplikowski,
David Grant, Gregg Larson and Lois Rem.
Absent:
None.
Also present were City Administrator, Joe Lynch; Parks and Recreation Director, Tom
Moore; Recreation Program Supervisor, Michelle Olson; City Attorney, Jerry Filla; and
Recording Secretary, Sheila Stowell.
PURPOSE OF MEETING
The purpose of the meeting was to consider approval of the Right of Early Entry to the City Hall
site on the Twin Cities Army Ammunition Plant (TCAAP); and award of a partial or whole
construction bid to Rochon Construction for construction of the new City Hall.
ADOPT AGENDA
MOTION:
Councilmember Grant moved and Councilmember Aplikowski scconded the
motion to adopt the agenda as presented. The motion carried unanimously (5-0).
APPROVAL OF RIGHT OF EARLY ENTRY
Mayor Probst introduced thc City Hall construction project, and briefly revicwcd the lengthy
process involved in obtaining the land conveyancc and arriving at this phase of the project.
Mayor Probst stated that most recent conversations with thc Department of Army (DoA)
indicated that the City was due to receive Fee Title to the City Hall site by September 29,2000.
Mayor Probst recognized this milestone, making the City of Arden Hills one of the first non-
military cntities to be granted ovmership of any property on the TCAAP site, with the exception
of several minor rights-of-way having been granted.
Mayor Probst invited Councilmembers to comment at this time.
ARDEN HILLS CITY COUNCIL - August 15, 2000
DRAFT
2
.
Councilmember Aplikowski referrcd to the proposed "Right of Entry" document, spccifically
addressing the wording, ".. .whcn and iJ'..." in Itcm 2, "Consideration," on page threc (3) of the
document.
City Attorney Filla addrcssed the document language, stating that is was standard language for
fedcral government contracts, and as legislation had already deternlined the suitability of
conveyance, Mr. Filla saw no reason for concern.
Councilmemher Rem addressed conccrns regarding the outstanding public comment period for
the Finding of Suitability for Transfer (FOST) remaining open until September 5, 2000, and thc
Council taking any action prior to the end ofthe comment period.
City Attorney Filla stated that the FOST simply documented a small portion of the agreement;
and there was minimal chance of any controversy or even public comment on the document, as
the transfer was not a controversial issue.
Councilmember Rem further expressed concerns regarding the limited time frame - six (6)
months - of the Right of Entry Agreement, while waiting for the Fee Title paperwork to be
proccssed, as it related to start of constmction.
Mayor Probst addressed Councilmember Rem's concerns, stating that Congress had acted and a
thc land convcyance was cmincnt, with only the federal bureaucracy and paperwork process with .
thc DoA remaining outstanding. Mayor Probst reiterated his confidence that this will happen.
Mayor Probst expressed his conccrn that continued delays were escalating costs to taxpayers,
with the City having to bid thc project twice, as we were unaware of the required paperwork
process.
Councilmember Grant concurred with Councilmember Rem's concerns regarding the Right of
Entry Agreement's six (6) month term, and continued delays by the DoA for the land
conveyance. Councilmember Grant refcrenced several dates addressed in the July 21, 2000 lcttcr
from Rochon Corporation to the City of Arden I-lills.
City Administrator Lynch stated that the dates in the letter were based on conversations with the
Army Corps of Engineers, and since those conversations the dates had further changed. Mr.
Lynch defcrrcd to City Attorney Filla to address several minor legal conccrns, hut stated that
stalT had verified that awarding the contract conditionally, with a limited Notice to Proceed, in
accordance with limitations ofthe DoA's Right of Entry document, would not commit the City
to ordering of the steel for the project, a major financial undertaking, and the City would be
committing to the work done to-datc.
Peter V csterhoIt, Architect with Architectural Alliance, stated that the letter from Rochon
Corporation had been rcviewcd and drafted at the recommendation of Rochon Corporation's
attorney, and concurrcncc with the City's Architect.
e
.
.
.
D~'I'..".'i.... Ii' t:T
:~(A~- .
ARDEN HlLLS CITY COUNCIL - August 15,2000
3
Mr. Robert Dcw, Project Manager with Rochon, clarified his intentions in the July 21st letter,
stating that at thc timc of writing, the dates specified were used as a "hopeful milestone," and
were used, as directed by their compallY's legal counsel, to protect their firm from any fallout
should the City invoke suspension of thc contract, and to protect from ramifications with their
subcontractors. Mr. Dew stated that, should the City award the full contract, with conditions for
partial work, - there was limited liability to Rochon, or their subcontractors, as all contracts with
subcontractors would contain thc same verbiage in a flow-through clause. Mr. Dew assurcd the
City that, according to bid proccdure and the way the contract documents arc writtcn, the City
still maintained control in the amount of work the contractor would be authorized to proceed
with.
Mayor Probst askcd for City Attomey Filla's opinion on public bidding laws and the City's
responsibility regarding awarding of the full contract, and the inability to modify thc contract
without a rebid process.
City Attorney Filla clarified that the City could not issue a partial contract. Mr. Filla reviewcd
several of the contract's terms; specifically the ramifications if the City were not able to acquire
titlc to the property after part of contract is partially started and that the contract stated that either
party can terminate contract for cause. Mr. Filla statcd that the contract speaks in terms of
damages to partics; with arbitration binding after contract issue; and that the City would only be
liable for the work done to-datc, and would not need to proceed further. Mr. Filla stated that
there was limited liability to thc City, and if the contract werc terminated, it would need to be
deteDnined what loss/profit thcrc would be, and the contractor would need to be reimbursed for
costs to-date. Mr. Filla referenced the July 21, 2000 lcttcr from Rochon Corporation, addressing
thcir company's exposure and the City's risk to approximately $330,000. Mr. Filla stated that
thc City's options were either to award the contract before thc contract award expiration, or rebid
thc project once Fee Title to the property is obtained.
Councilmember Larson concurred with Mr. Filla's comments, stating the small risk to the City
was not a great concern, as there was minimal risk that the propcrty conveyance would not
happcn. Councilmember Larson emphasized that the legislation had officially authorized
transfcr of the property. Councilmember Larson stated that hc fully supported award of the
contract, that it was time for the City to take the step, that it was a great design, a symbol of thc
business of government, and a facility that the citizens and staff could be proud of.
Mayor Probst again addressed the minimal risk to the City, stating that the City's environmcntal
consultant had held up the proccss due to discussions with the Mil11lesota Pollution Control
Agency (MPCA); and that the DoA was making every attcmpt to process the paperwork in a
timely way.
Councilmember Aplikowski statcd that she continued to havc rcservations without the actual Fee
Title, but concurrcd that, at this point, there was minimal risk to the City and she was willing to
DP"> Ci, if" T'
~ ,~~t(~~\r '
ARDEN HILLS CITY COUNCIL - August 15, 2000 4
support thc project going forward. Councilmember Aplikowski did express concerns about the .
additional costs projected due to winter construction.
Councilmember Grant stated that he concurrcd with Councilmember Rem's comments, and
continucd to have concerns about the language in the Right of Entry documcnt, and questioned
whether this was standard language for the DoA. Councilmember Grant was concerned that the
document fully protected the DoA' s rights, but the City had little recourse.
City Attorney Filla stated that the document appeared to be standard for a DoA document, with
the first paragraph addrcssing their right to essentially revoke thc document at any time. Mr.
Filla stated that he wouldn't expcct any othcr documcnt from a federal agency, as they usually
maintained all authority. Mr. Filla rcmindcd Councilmembers that the DoA had also been
working on the land conveyancc for tcn (10) years, and that the City was dealing with a branch
ofthe U.S. Government, and should have evcry rcasonable expectation that the land conveyancc
will occur. Mr. Filla stated that, if the Council was looking for a document that guaranteed no
financial risk to the City, the DoA would not cooperatc with such verbiagc. Mr. Filla stated that,
the only reasonable event that they would not convey, would be for an environmental issue, and
the property has been reviewed so thoroughly, there should be no reason to suspect any
environmental issue.
Councilmember Rem stated that the City's environmental consultant had found environmental
issues that the DoA had missed before, and while the City had received the Icgislation, we still .
had no firm datc, and since the City had been pursuing the property for ten (10) years already,
she was not confident of that process. Councilmember Rcm expressed rcsidents and her personal
concerns about what the cost had been to the City in bidding the project twice, prior to
possession ofFec Title.
Mayor Probst concurred with the comments made by Councilmember Larson, and City Attorney
fills regarding the good faith action by the DoA in providing an early Right-of-Entry document
to accommodate preliminary construction work, and that the small parcel for City Hall had been
held to a higher standard of cnvironmental conccrn than any othcr portion of TCAAP. Mayor
Probst encouraged Councilmembers to move the project forward at this time.
Councilmember Grant expresscd further concerns that the DoA had all the legal authority in thc
Right of Entry document, with thc City being required to take the legal document at face valuc
and take a "leap of faith" hoping that all would work out.
Councilmember Larson acknowledged Councilmember Rem's comments regarding actions of
previous City Council's in decisions regarding moving forward with construction bids prior to
having Fee Titlc to the property, but stated that the current City Council had followed suit in
rccent Council actions.
.
e
.
.
ARDEN HILLS CITY COUNCIL - August 15,2000
W"''''':t
I.,cY
T
5
MOTION:
Councilmcmber Larson moved, and Councilmembcr Aplikowski seconded a
motion to authorize Mayor Probst to cnter into a Right-of-Entry Agrecmcnt as
prepared by the Department of ArnlY (Do A) Materiel Command, Document No.
DACA45-3-00-6088. Thc motion carried (4-1, Council member Rem opposed).
AWARD OF PARTIAL OR WHOLE CONSTRUCTION BID
City Attorney Filla initiated discussion on the contract, and its potcntial award as addressed in
thc July 21, 2000 letter from Rochon Corporation and subsequent July 24, 2000 lcttcr from
Architectural Alliance regarding conditions for a Notice to Proceed and stipulating the work to
be authorizcd.
Architect, Peter V csterholt, clarified the referenced turn lane condition as being one in the same
with the median cut on Highway 96.
Councilmember Grant requested Mr. Dew to address thc extcnt of Rochon's cost for the proj ect
at the start of the project, provided the City gives a Notice to Proceed.
Mr. Dew stated that preconstruction mobilization costs typically amount to 70% of their total
cost and include site setup; on-site office for their construction superintendent; and temporary
utilities.
Councilmember Aplikowski asked Mr. Dew to clarify what happens, from Rochon's perspective,
ifby September 29,2000 the City still does not have Fee Title to the property.
Mr. Dew explaincd that from his perspective, he's in much thc same situation as the City, and
that lack of the Fee Title document is a step of faith for their company as well. Mr. Dew
emphasized the cooperative work relationship required by the City and Rochon in getting the
project completed. Mr. Dew stated that, once the project is begun the City and Rochon would
need to decidc the feasibility of winter construction (i.e., concrete pour), or whethcr the project
needed to be shut dO'Nll for a time and resumed in the spring. Mr. Dew further stated that his
company had a proven ability to work out an equitable solution for all parties, and that he was
hopeful that all parties could agrce on a workable time frame.
Mr. Dcw addressed Couneilmember Aplikowski's concerns regarding winter construction costs,
stating that they were already built into the contract.
City Attorney Filla stated that the tenn of the standard construction agrcement was for one (1)
year; and that whcn there were delays, the time for completion is sometimes extended, with somc
cost adj ustments, as agreed upon by both parties. Mr. Filla furthcr stated that the contract
documents address all of these issues.
D.. .'. F() A' ri:T
: b\. i '\ ~
ARDEN HILLS CITY COUNCIL - August 15, 2000
6
.
Councilmember Rem stated that her conccrns were not with the contractor, but with the DoA,
and that as a Councilmcmber, she needcd to be concerned about where the City's money was
spent.
Mr. Dew stated that he had previously worked for thc Departmcnt of Army, and as a general
rule, they operated in good faith. He stated that he was confident that, if the City had gotten this
far in the land conveyance process, the DoA would fulfill their obligations and take the ncxt step.
Mr. Dew expressed his prcvious experiencc with the bureaucratic process, and stated the City's
experiencc is not unusual, or more lengthy than the usual process. Mr. Dew clarified that the
elevator construction would not affect line item costs.
MOTION:
Councilmember Aplikowski movcd and Councilmember Larson seconded a
motion to award the contract for construction of a ncw City Hall facility to
Rochon Corporation; authorizc Mayor Probst to enter into an agreement identified
as a "Standard Form of Agrcement Between OW11er and Contractor where thc
basis of payment is a Stipulated Sum;" and authorize issuance of a partial Notice
to Proceed to Rochon Corporation in an amount not to exceed $329,150.00, for
the following work:
1. Earthwork ($54,100.00);
2. Outside utilities ($174,400.00);
3. Turn lane work described as "Alternate No. B," Highway 96 median cut .
($16,000.00);
4. Shop Drawings for long lead items, inclusive of structural steel, joist, deck,
precast concrete, stone masomy, concrete reinforcement, electrical
switchgcar, elevator, and air handling equipment ($18,000.00); and
5. Rochon's Costs, inclusivc of mobilization and set up ($65,650.00).
The motion carried (4-1, Councilmember Rem opposed).
Mayor Probst annOlillced that this concluded the "Unfinished and New Business" to be
conducted at the meeting.
Mr. Vesterholt requested that thc contract be executed by Mayor Probst immediately to allow
preparation of the formal Notice to Proceed to the contractor.
GROUNDBREAKING CEREMONY, PRELIMINARY DISCUSSION
On a related note, conclusive of the two actions takcn by the City Council. Mayor Probst
inquired as to thc Council's willingness to schcdule a public groundbreaking on the new City
Hall site, after Rochon Corporation has mobilizcd.
.
.
.
.
!oi4W"
F-
l.:,;
~
ARDEN HILLS CITY COUNCIL - August 15, 2000
7
City Councilmember concurred that staff bc directcd to bcgin prcparations for a public
groundbreaking ceremony in early Scptember, with invitations to include dignitaries (i.e.,
Congressman Vcnto; Senator Grams; former Mayors and Councilmembers and others as
observed.)
MOTION:
Councihnember Grant moved and Councilmember Aplikowski seconded a
motion to adjourn the Special Mecting of the Arden Hills City Council at 9:03
p.m. The motion carried unanimously (5-0).
Dcnnis Probst
Mayor
Joscph P. Lynch
City Administrator
e
.
.
\~
~,.."'1li
'" '..
B"'. \? '\
Q,,Q &~'"
!\,'"
."
~~~FT
CLOSED EXECUTIVE SESSION
CITY OF ARDEN HILLS, MINNESOTA
CITY COUNCIL MEETING
AUGUST 21, 2000
5:45 P.M. - ARDEN HILLS CITY COUNCIL CHAMBERS/CONFERENCE ROOM
CALL TO ORDER
Pursuant to duc call and notice thereof, Mayor Dennis Probst called to ordcr a Special
Meeting/City Council Worksession at 4:45 p.m. in the City Council Chambers.
Present:
Mayor Probst; Councilmembers Beverly Aplikowski,
Gregg Larson; and Lois Rem.
Absent:
Councilmember David Grant, who had previously notified Mayor Probst
of his inability to attend this meeting.
Also present were City Administrator, Joe Lynch; City Treasurer, Terrancc Post; Public
Works Dircctor, Dwayne Stafford; and City Attorney, Jerry Filla.
PURPOSE OF MEETING
Mayor Probst, upon convening thc meeting, adjourned to the City Hall Conference Room
for a Closed Executive Session to discuss pending litigation entitled, "Josephine East,
LLDC, a MN Limited Liability Corporation, Plaintiff; vs. Robert Wesslund, an
Individual, Dee Rushenberg, an Individual and the City of Arden Hills and through its
City Council, Defendants."
There was no action takcn.
RECESS
Mayor Probst adjourned the Closed Executive Session at 5:53 p.m., and reconvened the
regular City Council Worksession at 5:56 p.m. in the City Council Chambcrs.
Dennis Probst
Mayor
Joseph P. Lynch
City Administrator
i
.
.
.
DRAFT
MEETING MINUTES
CITY COUNCIL WORKSESSION
MONDAY, AUGUST 21, 2000
4:45 P.M. - CITY HALL, 4364 WEST ROUND LAKE ROAD
CALL TO ORDER
Mayor Probst callcd the meeting to order at 4:45 p.m. Those present included Councilmembers
Bcverly Aplikowski, Gregg Larson and Lois Rcm. Councilmembcr Grant had previOLlsly
notified Mayor Probst of his inability to attend tonight's Worksession.
Staffprcsent included City Administrator, Joe Lynch; City Accountant, Tcrry Post; Public
Works Dircctor, Dwayne Stafford; Parks and Rccreation Director, Tom Moore; Recreation
Program Supcrvisor, Michclle Olson; Planner, Jennifer Chaput; and Recording Secretary, Sheila
Stowcll.
Mayor Probst closed the Council Worksession at 4:47 p.m. for a Closed Exccutive Session to
discuss pending litigation.
Mayor Probst reconvencd the Council Worksession at 5:56 .m.
DISCUSSION ITEMS
a.
County Road I and Schutta Road
City Administrator Lynch introduced Mr. Jim Tolaas, Ramsey County Department of Public
Works. Mr. Tolaas was in attendance to discuss the design process with Ramsey County's
County Road I and Schutta Road project in the City of Shoreview related to Shorcview's
Wispark Development; and the future development ramifications with the City of Arden Hills.
Discussion itcms included Ramsey County's policy regarding semiphore cost participation
betwecn the City and County; the elevcn (1 I) warrants to be met for County installation ofa
semiphore; the status of thc West Round Lake Road signal rcimbursement; and work to-datc
regarding area transportation issues and future planning needs.
Staff was directed to bring back the parking resolution for County Road I at the August 28, 2000
regular City Council meeting.
Highways 96/1 OIntersection
Mr. Tolaas discussed the current status of final design for thc Highways 96/1 0 intersection.
Discussion items included the study bcing conducted through work with the 1-35W Corridor
Coalition, a process of approximately seven (7) months, which is tied to the build out study; cost
sharing and revenue sources; right-of-way acquisition; availability oftumback dollars;
ARDEN HILLS CITY COUNCIL WORKSESSION - AUGUST 21, 2000
2
Mayor Probst requested that Mr. Tolaas advise Mr. Mayasich of the City of Arden Hills' desire
to be included in any current or future discussions regarding any Twin Citics Army Ammunition
Plant (TCAAP) development and/or access points. Mr. Tolaas stated that Ramsey County and
the National Guard were in discussions about thc potential resiting ofthe joint maintenance
facility to comply with City zoning requircments.
.
County Road E, Streetlight Standard Replacement
Mr. Stafford presented evidcnce ofthe need to replace the seventeen (17) strectlight standards
along County Road E due to the deterioration of the underground mountings. Mr. Stafford
estimated the cost of replacement to be between S 1,700 - $2,300 per standard, exclusivc of
mounting and lightheads, Mr. Stafford was working with a firm that suggestcd replacement of
the concrete pillars, at approximately $3,000 per pole. Ivl1'. Stafford rccommended to the Council
that they direct the City's Operations and Finance Committee to review the City's currcnt street
light policy and potential design of a City streetlight standard.
Discussion items included thc immediatc safety issues; involvement ofthc Planning Commission
in any future city-wide lighting design process
Staff was directcd to bring a recommendation to the City Council at their August 28, 2000
regnlar mceting with an estimatcd cost for a temporary repair solution; as well as a
recommendation to the Operations and Finance Committee and thc Planning Commission for
further study.
.
b. Ingerson Road
Mayor Probst stated that the purpose of this agenda item tonight was for an informal presentation
of the two (2) rcports; that ofthe Ingerson Neighborhood Review Group and that of City Staff
and the Consulting Engineer. Mayor Probst asked that any further elaboration on specific points
in cither report be held until the August 28, 2000 formal presentation to thc full City Council at
their regular meeting. Mayor Probst statcd that, at the August 28th meeting, a public information
meeting date would be established, with further Council action to follow that public mceting.
Ms. Linda Swanson, representing the Ingerson Neighborhood Review Group, thanked Mayor
Probst, Councilmembers, City staff, and Consulting Engineer, Greg Brown, for the opportunity
to rcview the proposed 2000 Street Improvemcnt Project, and to provide recommendations to the
City Council.
Ms. Swanson reviewed the specific items of agrecmcnt, and those conflicting items, between the
staff and neighborhood groups.
Mayor Probst expressed his appreciation that therc appeared to be more commonality than
differences in the reports.
Discussion items included the detriment of increased road widths to yard drainage; potcntial .
closure of Ham line Avenue and lack of consensus ofthe neighborhood group; increased traffic
.
.
.
ARDEN HILLS CITY COUNCIL WORKSESSION - AUGUST 21, 2000
"
~
on Ingerson and Dunlap; Lake Josephine Association and the Fernwood Channel rccreational
land value; untreated stormwater into wetlands; the presentation on raingardens by
reprcsentatives of the City of Maple wood, and the varying soils involved; protection or
insulation of water and sewer lines in some areas proposed for raingarden installation.
Mayor Probst complimented the Review Group, and again thanked them for their research and
prcsentation.
Councilmember Aplikowski requested comments from anyone else in the audience.
Two (2) lillidentified representatives of thc Lake Josephine Association, werc present and
requestcd more definitive information on the plan for the Fernwood Channel, as it dircctly
affected their property. They asked the City Council to be included in any future discussions.
Mayor Probst stated that the City Council anticipated the public informational meeting to be
scheduled at one of the September regular Council meetings, and assured the residents that the
neighborhood would be notified.
Staff was directed to establish an orderly fashion to address the specific issues involved in the
report, to allow the City Council to dircct the consulting engineer to prepare a revised fcasibility
report.
c.
2001 Budget
Mr. Post stated that staff was continuing to work on the previous dircctive of the City Council to
provide a 2001 Budget, based on a maximum levy increase of2.5%.
Mr. Post addressed the proposed unbudgeted streetlight standard repair and/or replacement, and
stated that this should possibly bc considered as a 2000 project as funding was more readily
availablc at this time. Mr. Post also addressed the Council's proposal for thc 2001/02 Pavement
Management Plan (PMP), and the possibility of pending development in the Gateway Business
District and the need to rcprioritize the West Round Lake Road Phase II project.
COlillcilmember Aplikowski lobbied for increasing the 20011cvy to three percent (3%).
Mr. Post advised that the optional datcs for the City's Truth in Taxation datcs would be
Deccmber 4th or December II t\ with the Preliminary Levy due to Ramsey County by Septcmber
15,2000.
Staff was directed to plan for the Ingerson Neighborhood Project as the PMP Project for 2001,
and that future proj ects would most likely continue on a two-year cycle and process; and to
continue with thc proposed 2.5% maximum lcvy increase.
ARDEN HILLS CITY COUNCIL WORKSESSION - AUGUST 21, 2000
4
STAFI<' COMMENTS
.
Parks Director Moore rcported on various activities of the Parks and Recreation Dcpartment
including, rccent trail grooming and brush clcaring; Ingerson Park playstructure installation; fall
aeration; Cummings Park warminghouse rcpair done by staff at an (approximate savings of
$4,000; addition of a practice soccer ficld at Floral Park; soccer ficld #3 at Perry Park now being
operational; ongoing improved working relationship with Northwestern Collegc regarding the
Presbyterian Homes ficlds and fccs.
Plarmer Chaput reported on various issues before the Planning Commission regarding future
proposed zoning and sign ordinancc changes; as well as seeking Council input at a future joint
Planning Commission/City Council Worksession on these issues.
Recreation Program Supervisor Olson updated the Council on various Recreation activities
including increased socccr teams; need for additional fields; addition of a new pre-school soccer
league; and increased nunlbers reflected from thc new recreation guide.
Public Works Dircctor Stafford reported that the City was making good use ofthe easement
machine in maintenance rccently purchased jointly with the City of White Bear Lake; a planned
meeting with BRW staff on Thursday to discuss the Highway 96 median cut; testing and repair
of the City's civil defcnse sirens; status ofthe requested speed study for Highway 51; staff
research and drafting of an ordinance requiring installation of grease traps to prevent recurring
grease problems in City sewer lines from food processors and restaurants. Mr. Stafford reported .
that more ofthese problems were being found with thc advanced televising of the sewer lines.
Mr. Brown stated that a report on thc recent televising of the City's sanitary sewcr system would
be forthcoming, with the Edgewater and Ingerson neighborhoods having the most immediate
areas for concern.
City Treasurer Post rcported that he would be secking Council authorization in the near future
for submitting a grant proposal to the Minncsota Department of Transportation (MnDOT) for
potential financing and reimbursement of property acquisition costs at the Indykiewicz site. Mr.
Post also stated that additional Finance Department activities included work on the 2001 Budget
and election training.
City Administrator Lynch reported on the upcoming Preconstmction meeting for construction of
the City Hall facility; meeting with MnDOT and Ramsey County for potential rcloeation of a
National Guard site and commcrcial driver's facility fTOm Fort Snelling to the Twin Cities Army
Ammunition Plant (TCAAP); and a recent meeting with the St. Paul Water Utility regarding
their interest in purchasing the City of Arden Hills' water system.
Relatcd discussion items included the viability of ownership of the water system by another
party; capacities of neighboring communities; and thc status of the request for the City to acquire
the TCAAP infrastructure system.
.
.
.
.
ARDEN HILLS CITY COUNCIL WORKSESSION - AUGUST 21, 2000
5
COUNCIL COMMENTS
Councilmember Larson requested further Couucil follow up to staff recommendations regarding
revisions to the City's Zoning Ordinance and why the Council failed to reach a consensus.
Councilmember Larson asked that the Council reconsider their decision regarding continuing
parking issues; nou-owner-occupied residenccs; property valuation repercussions; and further
public information of the proposed changes.
It was the consensus of the Councilmembers and staff was directed to schedule a joint
Worksession in September between the Planning Commission and City Council to discuss
various zoning ordinance revisions, including the above-referenccd item and antennas.
Another concern raised by Councilmembers was the numerous complaints received rcgarding the
home-based business on County Road E. Planner Chaput advised that there was an application
forthcoming to the Planning Commission from the resident for a Special Usc Permit for a Class
Two Home Occupation.
Councilmember Rem adviscd that Mayor Probst would be presenting a historical perspective on
thc lengthy process for the construction of the new City Hall facility at thc next Operations and
Finance Committee meeting.
Councilmember Aplikowski adviscd that the City Events Task Force was moving forward with
plans for the City's Fiftieth Anniversary celebration and that a onc-time annual calendar was
being planned, with historical photographs being solicited. Councilmember Aplikowski also
reported on the Communications Committee and their continued diligence and dedication.
Mayor Probst discussed upcoming vacancies in the City's Planning Commission; and requested
clarification of thc schedule for the revised City logo and its inclusion in the next Recreation
Guide printing.
City Administrator Lynch advised that the three options for the logo would be presented to the
City Council at one of their Scptember meetings.
Discussion ensued regarding the process to be followcd by staff and the consulting engineer for
the Ingerson Ncighborhood Street Improvement Project. Staff was dirccted to provide a topic by
topic report to allow the City Council to reach agrcement on the direction to provide to the
consulting enginecr for an amended fcasibility study; to then hold a public informational
meeting; then call for detailed plans and spccifications; then the formal Public Hearing related to
the Chapter 429 assessment proccss. Staff was furthcr directed to consult with Ms. Swanson, as
the spokesperson for the Ingerson neighborhood prior to the public information mecting; to
provide an adequate number of visuals for ease of presentation and understanding; and to prepare
for a review of the City's Assessment Policy regarding the basis of road width for assessment
purposes.
ARDEN HILLS CITY COUNCIL WORKSESSION - AUGUST 21, 2000
6
ADJOURN
MOTION: Councilmcmber Aplikowski moved and Councilmember Larson scconded
a motion to adjourn the meeting at 9:27 p.m. The motion carried unanimously (4-0).
.
.
.
I
~
.
.
.
CITY OF ARDEN HILLS
ACCOUNTS PAYABLE CLAIMS REPORT
TO BE APPROVED AT 08/28/00 COUNCIL MEETING
CLAtMS PAID St[\"CE LAST COe"lCIL MEETING (08/14/001
18145
18146
18147
18148
18149
18150
18151
18152
18153
08/10/00
08/11/00
08/15100
08/1 5100
08/1 5/00
08/16/00
08117/00
08117100
08121/00
~:X::,~'t~iW#):::::-:-:
'. .... ....... '. 'AMorm."
Petty Cash
Northern States Power Com an
Affinitv Plus Federal Credit Union
leMA Retirement Trust - 457
Public Em 10 'ees Retirement Association
DCA, Inc. - FSA De artment
Met Council Environmental Services
Minnesota Mutual Life Insurance
Allied Blackto
210.46
2,509.47
3,966.96
1,779.91
3.152.21
743.00
8.712.00
285.30
48.88614
I Subtotal. Paid Claims
70.245.45 I
Paid Claims From Above -
70.245.45
Add Unpaid Claims, Page 3 of 3 -
40737.20
Total Accounts Payable Claims
for Council Approval, 08/28/00-
110,982.65
Note:
Checks for unpaid claims totaling S250,430.15 were mailed
on August 15,2000 after approval at the August 14,2000
Council Meeting. They were check numbers 13083 - 18144
This sequence corresponds to unpaid temporary numbers
T I - T62. Check numbers 18081 - 18082 were used for
alignment.
Pe Cash Re lenislunent
Jul ServLee
Second Au ust Pavroll
Second Au ust Pa 'Toll
Second Au ust Pavroll
Medical Reimbursement 8/04/00
SAC Char es - Jul 2000
Se tembcr Life Insurance
2000 Seakoating - Final Pa ent
PAGE10F3
_""dV'''''''"'''p,_vah'""".",,
\
CITY OF ARDEN HILLS
ACCOUNTS PAY ABLE CLAIMS REPORT
TO BE APPROVED AT 08/28/00 COUNCIL MEETING
~
.
PAGE20FJ
UNPAID CLAIMS REGISTER:
......jjtMr~....I.tK..llAtll.
1'01 08/29/00 Accurate Press, rne 61238 August Newsletter
1'02 08/29/00 Anderberg-Lund Printing: Co. 6,056.66 Fall 2000 Recreation Guides (Otv 5300)
T03 08/29/00 AT&T 98.28 Lone Distance
T04 08/29/00 Berres, Sandra 16.25 Mileage Reimbursement
1'05 08/29/00 Rirfs, Inc. 521.92 Portable Toilets
1'06 08/29/00 Bover Ford Trucks, Inc. 48.80 Tensioner # I 06
1'07 08/29/00 Bradley, Cynthia 36.00 Refund-Soccer
1'08 08/29100 Bmnn, LU.4.tUl 240.00 Au,,"sl Cleaning-City Hall
1'09 08/29100 Ca<;e Credit Cornoration 54.08 Transmission Filters #20
1'10 08/29/00 c.c. Sharrmv Co., Inc. 16.87 Backhoe Lifting Bracket
TlI 08/29/00 Connellv Industrial Electronic 331.57 Chart Recorder/Scanner Module-Labor
1'12 08/29/00 Comorate Express 72.11 Office Supplies
1'13 08/29/00 Electronic Interiors, Inc. 546.44 Electronic Techn for New Council Chambers
1'14 08/29/00 Em,en, Gat\! 351.00 2000 MV Mustangs Football Camp
Tl5 08/29/00 Franallone's Hardware 62.64 August Purchascs
1'16 08/29/00 Galvan's Trudino Company 15000 Gift Certificates- Temn Park Maint Emoloyees
1'17 08/29/00 Gonher Sport 105.56 Chin Straps
TI8 08/29/00 GaDher State Om~-Ca1J 92.80 Julv Servicc
1'19 08/29/00 Hvdro SUDolv Company 18.915.27 Meter Install & Uogrades #1 8 & #19
1'20 08/29/00 ICI Dulux Paint Centers 701.93 Paint-Soccer GoalslWarmio2: House/Fields
1'21 08/29100 Indenendent Sports Network 1,033.50 Umpire Services 7/25-8/10
1'22 08/29/00 LV.a.E. Local 49 262.00 Au::mst Payroll Deductions
1'23 08/29/00 Kath Auto Parts 18.20 Belt # 107
1'24 08/29/00 Larkin, Hoffman, Daly & Lindgren 263.60 Prof Services throuph 7/31~Citv Hall Site
T25 08/29/00 Mac Queen EClUipmeor, Tnc. 681.05 CleanJRcoair Blower
1'26 08/29/00 Midwest Asphalt Com 130.79 Road Repair Material
1'27 08/29/00 Mike's Tree Service 1.411l3 Stonn Damage-Trees on Public Pronertv
T28 08/29100 Natale's Caffe 86.09 Council W orksession 8/21
1'29 08/29/00 Perrnn,James 21.25 Cell Phone Case-Reimbursement
130 08!29100 Peterson, Fram & Bcr.Qman 3.433.26 Jul'll Legal Services
Tl1 08/29/00 Pitney Bovlo'cs 463 00 Service Postage Metcr
1'32 08/29/00 Ramscy County 1,498.34 Fuel Purchases-Jul\'
T33 08/29/00 Roseville, Citv of 20.10 Vikinas Trip Lunch
134 08/29100 S & S Tree Specialists 516.53 Tree Removal-Tno-erson Park
T35 08/29/00 Shorevie\-v, Citv of 132.29 2000 Summcr Trios
1'36 08/29/00 Stafford, Dwa'rnc , 2568 , Mileage Reimbursement
I I
.
Total- unpaid Claims ~~.
39,027.37 I
,",J"'"'""",,,,p.y.bl.,,Io;",,1
.
I
,
e
.
.
CITY OF ARDEN HILLS
ACCOUNTS PAYABLE CLAIMS REPORT
TO BE APPROVED AT 08/28/00 COUNCIL MEETING
UNPAID CLAt~IS REGISTER:
T37
T38
T39
140
T41
T42
T43
':.;KnAT~. .
08/29/00
08/29100
08/29100
08/29100
08/29100
08/29100
08/29/00
Stowell, Sheila
TC Field & Co
Timesaver Ofl-Site Secretarial
United Rentals
US West Communications
West V....eld
Xerox Co oration
SubLoLal, Page 3 of 3 ~
Pa e 2 of 3 Brouo-ht Forward -
Total Unpaid Claims
PAGE J OF 3
80.89
91.00
630.13
47.18
213.36
98.58
548.69
1,709.83
39,027.37
40,737.20 I
Milea CIEx ense Reimbursement
Add De osit For e Covera e
Recordin Secret '-CC & PC
#202 Roller Parts
Phone Service-Public Works
Sho Su lies
Sc tember Co ier Lease
""dy""""u""p,yablo'ohim,J
.
7
~
~' g, ;;'
~ g-
o "-
:;; F ~
" ~
[ ~ ~
,
"
~ ~
. " i
g- ~
~ m ;!
"
~ ,
[ 0
0 '"
~. ~ rP."
;! "
0
~ , "
-a E >
. 0
f ~. .
if ~ ~
~
.. ~. ~
" ~
g, ~ !
~
. "
0
.
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ . ~ ~ ~ ~ ~ ~
~ ~ ~ ~ u, .~ ~ ~ v, '0, ~ ,~ ~ ~ ~ ~ ~ v, ~ ~ ~ ~ v,
'0 N '0 N N ~ N '0 N :0 - :::; - ~ - - . - ;0 0 0 0 0
X ~ ~ u, ~ w N - 0 X 7. ~ w ~ . - ~ 00 ~ ~
'* '* '* '* '* v, w w w w w w ,~ '<; N N N N N N N N N N
0 0 0 0 'C 'C 0 0 0 0 0 0 Q - - - :;: 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 g 0 0 0 0 0 0
0 0 0 0 0 0 C C 0 0 0 0 C 0 0 N N N - - -
N 00. W N - W - "" -..> 00 ~ '* w N ~ '* N - 0 '" "" ~ W
0 OJ :e "" 2;: - :>0 if; if; '" :;: m :>0 :;: OJ if; '" 0 n r m ::r: m m 1;
'" ~ F= 0' ~ " ~ ~ n 0 ~ '< 0 C "" '< ~ C n 0
" 0 X 0 "" C P ""
'< ~ :;: 0 F " ~ 0 0 a
0 "" 0 ,,;- -" a 0 ~ po 7' <1 0. a ~ ~
i' cr- " ~ o 0 0 p " "0 ? 0 -~ 0
0 .j!. :;0 -" " ~ P- m ? " 9 OJ ;;. J" o-J ." .f. 0 a cr- "
:;: ri<i 0. ::< 0 n " a -~ [!..
0 o-J . ~'t, ~ ~ " ~ m ~ 0 ~ ~ ::< Fil
,,' 0 0 0. "" :;: ~ ~ 0 ~ [!.. " 0 m S!2 ~
-" ~ 8 :;: 0. ~ ~ 0 ~
~ C 0 " ;;. g 5 0 '" 0 ~. M
"" ,,' 8 ~ " ~ 0 0 .g :;: '" 0 "0 S ~ ~ !,
" m p: '" Q~ 0 ~ ,,' 0 a '" ~ < z
0 "" ~ ~ " ~ 0 S" ~
0 0 ~ "" "" 0' 0 p: j;iI::
'" ~ g ~ "" S" ~ ~
[!.. ~
[!..
:tii F
:Vii" :N:
:~ $I ~
~ ow: ':Q'!; - - - - '0 - - - - .N - N - - ~
M M: '" .~ .~ 'w W '00 w g 0 .~ '" 'w 'w W 00 .~ ~ .~ '" 0 - .~ '0'
l.:I.l ~ ,,,",",0 w w - ~ 00 N l5 ~ ~ ~ ~ ~ ~ ~ ~ ~ w ~ ~ ~ 00 ~
.~: .i;ij * 'u - oc N N 0 ~ ~ N N N 0 - ~ '0 0 N ~ ~ w ~ 0 '"
Co ~ ~ 0 Co 0 c w ~ Co '" 00 ~ "' N 00 - 0 Co - N '" 0 ~ q;:
~ oc ~ 0 ~ 00 0 0 00 ~ N 0 0 ~ 00 0 ~ 0 00 ~ 0 0 N 0
8-
.~. ~:
:= :~ ::~:
B ~ - - - - ~
.f!l' :~ ,.,. ~ '" 00 N W 'N ~ ~ ~ '0 N w ~ '0 '" ~ w 00
-~: 00 c N ~ ~ 0 ~ ~ ~ ~ ~ N ~ ~ ~ ~ ~ ~ 0 0 ,.".
" ~ v. 0 ~ 7 " 00 ~ ~ w 0 N N N w 0 ~ - ~ ~ ~
'if .\i'l .itj. '" - N 0 "' '" ~ Co c., w 0; - N c., N 0 ;0 0 " N 0 "' "'
~ w ~ w ~ N X ~ ~ 0 ~ ~ '0 w ~ 0 - ~ N ~ N
N 00 " 00 N ~ ~ N 00 00 00 00 00 00 ~ N 0 N N 00 00 N 00 )#
c 0 0 0 @
~ c " ~ " 0 .~ 0 0 0 c 0 0 0 ~ " ~ ~ 0 0 ~ 0 p
0 g 0 0 0 " " 0 0 0 8 0 8 0 " 8 '" 0
0 0 0 0 0 0 0 0
0 - N 00 ;; ~.
~ 0 " " 0
0 c 0 0 0
0 ~ ~ ~ ~ ~ ~ ~ - ~ ~ w ~ ~ ;! ~ - 0
~ 0 g: o' ] g e '" if '" -
if ~ , ~ ~ ~ , if if N
~ ~ s. " " ~ ~
~ ~ ~ ~ ~ ~ ~ ;2 ~ ~ 5'
~ ~ ~ < ~ ~ ~
:a o' " " w w m ~ ~ " ~ "
~ ~ f- [ ~ 9 ~ ~
if " ~ i
~ " "' 0 '"
~ " " g 2
I 0 ~ ~ 0 ~
~ ! ~ , ~ Ii'
:;;
~ '" ,. ~
~ ~ ~
(")
:::j
-<
o
."
:I>
;0
o
m
z
:t
;=
r
00
roOO
_. m
:: (")
~ 0
!!:Z
:< 0
!::l:l>
NC
lOG')
oC
000
S'-1
o"ll
~~
~;o
go
r
r
OJ OJ Z r< 0 '" [ C >- :~::: OJ OJ OJ "
0 n '" ~ 8' m 81 '" '" '" J:
" " 0 :~I:: >- >- >-
> >- "" ~ >- m 2. t) m
,;a ~ " " ~ "' "
:<: ~ o' " r< n " 0 0 0
0 ~ '" "- 0 ~ g ~ '" '" " 3 "
~ 0 s:
0. 9- 0 0 " ~ h(' 0 2' '"
" ~ OJ " c !!' ~ n 3
~ @ ." '" il g '" 0 C
0 ~ >- c' 0 0 ~F a ~ " ~
~ il ~ C ~ :In:: " 0 0
", N 0 Q ~ 0
0 OJ 0 0 .. I @ < m
'" 0 ,,' "
"' n 2- " " 8 C
~ > @ 0 .~ " 0
$: g: '--'- a 0 !1!!
,Z.,:
C .~::: 0" ~
'"
2. 0
0
w w w
J~ .w "..0 'L.., 'w ~:
" ~ ~ 8:
:0: 0 N 00 N ~ w ~ 0 v, ~
0' ~ ~ 0 N ~ ~. 0, N ~
'" "' w N 0 V, c., 0 '" "' '"
N 0 0 w 0 0 0 0 ~ 0 'w 0
m:: "C 3!
~ ill " '"
'" ..
1 'ii, '"
N ", ~ ~
0 c; ill' 0 .::!
0 0 0 0 0 w 0 0 ill, ~
0 0 0 0 0 "' 0 0 ~: "
0 0 0 0 0 0 0 0
.
..., ..., ..., ..., ..., ..., ..., ()
~ ~ v, ~ ~ v, ~
w w w 'W w w N ::j
V, '" W N 0 ~ -<
e ... ... ... '" ... ... ... 0
'D 'D 'D co co OX> '-'
0 0 0 0 0 0 0 "TI
0 0 '^ W '" S
c. c. '-' :l>
;ll
'" ::r: tJ n o:J '" tJ ffl' 0
~ 0 o' " ~ '" m
'" j 3 a i.l ;;:.. * f;l. z
'" ~ "~ ~ ~:
~ ~~ v- i!- ~ 0: :I:
to '" ?
:.< '" ~.
(3 0 C'. ~ '"d C;t r
"" 5' ~ ~ ii' n' ~ ;~ r
0
~. 0 ~ ;<! en
'" o' ~
'" '" :~
n'
;~ h
@ N ~ w :::I:iI:
..... W :;:: '" .0:
.~ '" 00 w ~ '"
.~ '" '" 0 '" '0 0 0 :~
~ ~ 00 " 0 0 0
0 0 00 0 0 0
:~ m en
m z ;,j' m
N '" W ~ ()
;,;.;;J "' ~ 0 0 ~: .. 0
w '" ~ w 0 .~ v, :f ..
.~ :. .c ~ :;:: w '" ,.. Z
N 00 A 00 '" .g;: 0
~ N ~ ~ N ~ 0 :l>
~ ~ ....
~ N ~ C C c:
~ ~ g 6 g g N
0 0 !e G)
0 c:
0 en
8' -i
v. v. ~ ~ ~ v. ;;' 0 "tI
! 5 ! 3 0 ~ :l>
" 3
l ~ l -c ~ ~ ~ ~ -<
~ ~ ~ ~
~ " ~ ~ ~ 0 ;:0
~ ;;- 0
~ ~ ~ ~ " .8
. ~ ~ r
" 0 ,. ,. I' r
5. ii. ~ " 8
! ! g
C1
:t:
m
C1
"
en
o
>
....
m
o
o
00
-
~
00
o
o
;;
.,,-:C
III -
co ;ll
.. 'It
"'~
0-
-
'"
i
.
e
.
~
0-
'<
..c-
o
~
~
~
'"
~
8' '" ~
0
0 ~
. ..
. N .
~ S
~ 0-
,~ ~ ~
"
"
S .., "'
. ~ .~
~
0 g,
? ...;
0 g ~
~
~. a it
~ 0 '"
" .
fr ...; ~
~
';"i ?, ~
.
if ~
~ .
S' g;
0 ;{'
~ 0
~ , ~
g ~
g, "
~ ..; ~
~ ~ ~
.
~ -, ~ -, -, ~ ~ ~ ~ -, ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ -" ~ ~ -,
~ ~ i: ~ i: ~ i: ~ i: i: ~ ~ ~ ~ 0"; ~ 0"; ~ 0"; " '" ~ ~ ~ ~ ~ ~ ~ ~
~ 00 B: 00 00 -, -, ~ ;j ~ ~ ~ ~ e: 0 :;; 0
0 ~ 00 0 ~ w ~ 0 ~ 00 ~ ~ ~ ~ - 0 ~ 00 ~ 0 ~ ~
~ 9 ~ ~ ~ w w ~ w ~ o- W w ~ N N N ~ N N ~ ~ ,~ c c c c 0 I
0 0 0 ~ ~ 0 0 0 is 0 C 0 0 0 0 is is 0
0 5 0 0 s 0 0 0 0 g 0 0 is 0 0 c 0 0 0 0 c 0 0 0 0
s 0 0 8 ~ 0 s ~ 0 8 ~ 0 ~ N ~ N '" g s ~ 0
0 w ~ 00 0 ~ N ~ N 0 ~ 00 ~ w ~
C ~ " "~ ?: s " 2 ;c-. ." " if " ?: i:' ~ ." " n ti ~ S' ~ ~ " ; r- '" i ~ i'iI"
~ . s 0 ?' ~ 0- S " ~
c;; ~ 0 ~ 0 2C J. n ,? ,~ Q ,~ 0 0 a
0 .~ , ~ if 0 '" ~ ~ ~ 3" ~ ~ ,[ ~
0 if 0 " Jt 0 ~ ""='
."- .. ~ 0 jl. ,0 i? ~ ..; .0 ;; ,I:'; 0 - .0 0 8
?: ~ @ :j ~ , '" ~ c< 9' ~ ~ g ~ " J!- tJ ~ tJ , ~
g: tJ ;; g F tJ ~ ~ ~ 0 , ~ " tJ " 0 '" ~ " Q 0 .&-: '" m
" c 0 ~ ?: ~ ~. [ g ~ ." tJ if 5: " ~.
< " ~ ~ g ?: , " ~ . ~
"- if a; ~ & t @ 0 it ~ < " ~ "
" g , -g. t a; 0 'l"
. " ~ :ill;"
" ili'
m
+:" w:: m
~. :f.i1: lJl: ifi
~.. -e. ;<;4: - - - N - - p - N - - - - ~
~fJ:: ~ .~ 'w ~ '00 ~ 00 '0 0. .~ W 'w 'w '00 l! 0 w 'to '~ '0 .~ 'w ~ ~ ,~ w ~
'" N " ;;; " 0 0 ~ 0"; ;j ~ -, 2 N ~ W 0 ~ ;j 00 ~ 0 0 e: 0 e:
:ci'::: lli' :w.: 0 0 0 0 ~ N 0 N ~ N 0 0 0 ~ ~ 0 "
w 0 ~ ~ 'w <0 0 :;: w 00 '" '" 00 00 '" 0 - <0 W " ~ ~. 0 ~ <0 0 0 <0 <0 $:
:;r.:o;;:: ~ ::;0.::: 0 0 0 0 00 0 0 ~ 00 0 0 0 0 0 0 ~ 0 00 0 N 0 0 0 0 0 0
I~ - - - - - '"
:tl:: :~: ;; 0 ~ .~ ~ 'N '-" " ~ ~ ~ t;: w '0 '~ ~ oj 00 N ~ ~ '"
:8 0 ~ '^ ~ " " ~ '" u, ~ ~ 0 8 ~ N ~ 0 ~ :: :: ;; ~
:~~/ :~:: 0 ~ ~ 00 ~ ~ w - 00 0 0 0 ~ ~ ~ ~ 0
'" w '0 ~ " ;; w " 00 0 ;; os ~ b. '" " .. v, v, Co ~ 0 '" .. ~ 0 c; ~ i::
~:: ::\!? W -, ~ ~ ~ ~ N W 0 00 ~ w ~ 0 c_ ~ 0 w 0
N 00 00 00 N ~ 00 ~ 00 00 00 00 00 00 00 ~ ~ ~ ~ ~ 00 00 ~ 00 - - - - -
" 0 0 0 " ~ 0 ~ 0 0 0 0 0 0 w ~ " " 0 0 " 0 3: ?: 3: ?: 3:
[f 0 0 <0 " <0 0 0 g <0 <0 0 <0 <0 <0 ~ " " <0 " <0
0 0 0 0 0 0 0 0 0 0 0 0 0 - 0 0 0 0 0 0 0
00 w ~
0 <0 0
0 0 0
:;; - d' ;;J ;;' ~ ~ 'W 00 ~ ~ ~ 00 ~ ~ - " >
w g ~ ~ [ [ [ [ "' ~
0 ;} g g g' il' ~ [
" :r ~ [ ,
g 0 n (") ~
;:: ." ." ~ < i < ~ ~ < ~ ..; ...; '"
;:: ~ 0 0 ~ g ~ , s ~ .
0 z ~ ~
'" n " 0 Vi c: co Vi @
g, " " " g :;; ~ g ~ " o. ~ :;; p
" ~. '" :;.:.J:
3 < Q Q go ~ ~ go ~ 00 B
, " " ~ 0
g w " ~ " , (") ~
(") ~ ~ ...;
~ - '"
i:' .
"
< ~
0
,
C'l
~
-<
o
"
)>
;c
o
m
z
;;:
,...
,...
U>
-"
Ol_
-. ;c
~ U>
ro -I
15:)>
~c
oGl
~c:
",U>
0-1
0-0
c,)>
....-<
~::o
00
s~
" ;;
0 0
B: ";
~ ~ if c- o ." ~ " ~ ~ ()
() () a ~ '" 0 ~ I :!:
" "
" " '" " ~ too 0 tJ rn
..; :Z"
~ 0 " 0 ;; n ~ 0 ()
~ '" e: ~ ~ ~ ~ ." i "
~ ~ tJ ~ en
fj' 2-. f v.; ~ ~
, (;li > 0 :s' :0::'.: 0
~ " "" >
i: 0 s j C i?' ~J -<
,~ ..
0 ~ 0 11 rn
i: ;ft o' 0
() "'" i
;ft " 0
"" ~. '"
0
c ..
"~ " N 0
~ ,~ .~ :>;, 0
~ o~ 00 .~ :;; '" '~ 0. :;; ~.
00 ;;: ':: 0; ,~ ~ ;;: t;: 0 ~:
00 00 0 ,~ ~
0 .. N 0 <0 V, " g '" 0 v, ..
~ ~ w ~ 0 0 0 ~ N ~ 0
n: "
~: ;u
~ N ~: "l:
'~ '"
o~ ",. ~
0 0 ~ 0 0 ;;: 0 0 ~:
0 0 03 <0 0 '" <0 <0 ~.
0 0 0 0 ,~ 0 0 ;j::
.
\
e
~ ~ ~ ~ ~ ~ ~ " ~ ~ ~ ~ -, ()
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
0 0 0 ~ ~ ~ ~ :5: ~ ~ ~ :s
.a' N 0 ~ ~ ~ ~ ~ .~ N
~ ~ ~ ~ ~ 0
g, ~ ~ ~ ~ ~ ~ ~ ~ "T1
co co co .~ co co 00 00 00 00 ~ '"
"9' c 2 c c 0 0 0 0 0 0 0 0 >
.c ::; C c 0 0 2 .~ C' N 2 :::
~ '" A ~ ;lJ
0
N 0 ~ :t Q " () OJ '" :;1 Q iO::I m
g ~. r ~ c ". g Q "'.. z
" ! fr 0
00 " " ." " 5 " " "'ii. :I:
" 11 9 ," p }1 ,Q ? p" >"";
" OJ W ~ " r=
cr' " r- S. () :;: t;' 3: ~.. r-
~ !i ~ 5 !i '"
cr' ~ P " " ~ #{ C/l
fr ~ 0
~ , . " " 0 0; ~..
~ ~ " ~ (i" n
,. E- S '" " j('
o' " S- ~:
i1i' tr
~ w " w w N ~ ~ ~ ~ '" ~ ~ ~,.
c ~ ~ ~ " ~ ~ ~ ~ ~
ti..i ~ ~ ~ C N 0 C 0 0 "-l:.
" 0 w " 0 '" :;: ~ " 0 " " ~ ~.
"$(1 0 0 ~ 0 0 0 0 0 0 0 0
~ OJ :!J
~ :;2;: ~. ;lJ
or,:.;.: N w ;; N N ;; "' ~ OJ OJ ~ w i;,'.r: C/l
"* ~ w :s ~ ~ il) :0: ~ ro -I
:~ ,~ .~ N ~ ~ ~ ~ H' "'
0 >- .~ ~ '" 0 ;: ~ ~ 8: Co '" >
:~ ~ ::; c 0 w 0 N N ~ 0 -:<
c
~ > " ~ w ~ ~ '" G)
^ < . 0 0 0 0 0 ~ ::!
c N <0 0 0 N ~ 0 " " " " ~ C
0 0 0 0 0 0 0 !!' C/l
'" -I
'" -c
S >
~ ~ ~ ~ ~ ~ " ~ " ~ " " ~ '" -<
l l l l c 0 ~ l ~ ~ l ... ;lJ
I > ~
! ! E ! ! ff ! ;;:; 0
. " ~ " " '"
. . . ~ . ~ " I ~ ~ ~ . 2; r-
( ~ ~ ~ ,f . '" f ~ " ~ ., .8 r-
[ [ , 1 I I l ~. ~. ~ ]
~ ~ ~ ~ ! ~
l
(')
:I:
m
(')
'"
(J)
~
-i
m
"
<:>
'"
2;
~
'"
'"
"tJ"ii
Jl ;u
ro ..
"'~
o~
-
'"
e
.
CITY OF ARDEN HILLS
MEMORANDUM
DATE: August 24, 2000
FROM: Joe Lynch, City Administrator
TO: Mayor and City Council
SUBJECT: 2000 Bnsiness License Renewals
Requested Action
The City Council is asked to consider the approval of 2000 Business License renewals.
Back!!round
Attached is a list of businesses that, to date, have completed the license renewal process
for 2000. Staff is in the process of sending remindcr letters to those businesses that have
not responded.
.
Recommendation
Staff would recommend City Council approval of the 2000 Business Licenses identified
on the attachcd sheets.
JUseh
.
e
.
.
City of Arden Hills
4364 W. Round Lake Road
Arden Hills, MN 55112-5794
Phone: 651-633-5676
Business License Summary
For: 8/10/2000 through 8/24/2000
Printed:8/24/00
Page1 of 9
License Type: Business
Contact: Sewall Bros.
Local License: L1C2000-22
Expiration: 12/31/00
Total Fees:$20.00
Total Receipts: $20.00
Issued: 8/24/00 Issued By: Susan
Contact Phone: 651 /633-9222
Comments: Business 10
State License:
Issued:
Expiration:
License Type: Business
Contact: Blue Fox
Local License: L1C2000-31
Expiration: 12/31/00
Total Fees: $555.00
Total Receipts: $555.00
Issued: 8/1 0/00 Issued By:
Contact Phone:651/483-6000
Comments: Business 10:
State License:
Issued:
Expiration:
License Type: Business Issued: 8/1 0/00 Issued By:
Contact: Wells Fargo Bank Minnesota, Contact Phone:651/49-2666
Local License: L1C2000-32 Comments: Business 10:
Expiration: 12/31/00
Total Fees: $60.00
Total Receipts: $60.00
State License:
Issued:
Expiration:
License Type: Business
Contact: MSllnsurance
Local License: L1C2000-33
Expiration: 12/31/00
Total Fees:$340.00
Total Receipts: $340.00
Issued: 8/1 0/00 Issued By:
Contact Phone:651/631-7000
Comments: Business 10:
State License:
Issued:
Expiration:
Business License Summary
For: 8/10/2000 through 8/24/2000
Printed :8/24/00
Page2 of 9
--
License Type: Issued: 8/10/00 Issued By:
Contact: Adecco Employment Services, Contact Phone:651/483-1627
Local License: LlC2000-34 Comments: Business 1041-1786549
Expiration: 12/31/00
Total Fees:$.OO
Total Receipts: $.00
State License:
Issued:
Expiration:
License Type: Business Issued: 8/21/00 Issued By: Susan
Contact:Allina Medical Transportation Contact Phone:651/222-3728
Local License: LlC2000-35 Comments: Previously Healthspan Business 10 30078
Expiration: 12/31/00
Total Fees: $20.00
Total Receipts: $20.00
State License:
Issued:
Expiration:
License Type: Business Issued: 8/21/00 Issued By: Susan
Contact: Equity Commercial Services Contact Phone:651/481-8070 .
Local License: LlC2000-36 Comments: Previously Madison Marquette Realty Services,
Expiration: 12/31/00 State Li~~~se:
Total Fees: $20.00 Issued:
Total Receipts: $20.00 Expiration:
License Type: Business
Contact: First Student Inc.
Local License: LlC2000-37
Expiration: 12/31/00
Total Fees: $20.00
Total Receipts: $20.00
Issued: 8/21/00 Issued By: Susan
Contact Phone:
Comments: Business 10 650005982
State License:
Issued:
Expiration:
.
.
.
.
Business License Summary
For: 8/10/2000 through 8/24/2000
Printed:8/24/00
Page3 of 9
License Type: Business Issued: 8/11/00 Issued By: Susan
Contact: INX International Ink Company Contact Phone: 612/483-2300
Local License: L1C2000-38 Comments: Business 10 # 6478082
Expiration: 12/31/00
Total Fees: $20.00
Total Receipts: $20.00
State License:
Issued:
Expiration:
License Type: Business Issued: 8/21/00 Issued By: Supervisor
Contact: National Surface Cleaning Inc. Contact Phone:651/636-6829
Local License: L1C2000-39 Comments: Business 10 04-2936185
Expiration: 12/31/00
Total Fees: $20.00
Total Receipts: $20.00
State License:
Issued:
Expiration:
License Type: Business
Contact: Sl. Katherine's Ukranian
Local License: L1C2000-40
Expiration: 12/31/00
Total Fees: $20.00
Total Receipts: $20.00
Issued: 8/21/00 Issued By: Susan
Contact Phone: 651/636-0206
Comments:
State License:
Issued:
Expiration:
License Type: Business Issued: 8/21/00 Issued By: Susan
Contact: FailWay Outdoor Advertising Contact Phone: 612/735-8717
Local License: L1C2000-41 Comments: Business 10 #58-1093347
Expiration: 12/31/00
Total Fees: $40.00
Total Receipts: $40.00
State License:
Issued:
Expiration:
License Type: Business
Contact: Kennedy Transmission
Local License: L1C2000-42
Expiration: 12/31/00
Total Fees: $40.00
Total Receipts: $40.00
Issued: 8/21/00 Issued By: Susan
Contact Phone:651/482-9233
Comments: Business 10 #41-1648189
State License:
Issued:
Expiration:
Business License Summary
For: 8/10/2000 through 8/24/2000
Printed:8/24/00
Page4 of 9
--
License Type: Business
Contact: Resistance Technoiogy
Local License: LiC2000-43
Expiration: 12/31/00
Total Fees:$40.00
Total Receipts: $40.00
Issued: 8/21/00 Issued By: Supervisor
Contact Phone:651/636-9770
Comments: Business 1041-1305251
State License:
Issued:
Expiration:
License Type: Business
Contact: St. Paul Metalcraft
Local License: LiC2000-44
Expiration: 12/31/00
Total Fees: $4000
Total Receipts: $40.00
Issued: 8/21/00 Issued By: Pam
Contact Phone: 651/483-6641
Comments: Business 10 0587279-0-00
State License:
Issued:
Expiration:
License Type: Business
Contact: Land O'Lakes
Local License: LiC2000-45
Expiration: 12/31/00
Total Fees:$70.00
Total Receipts: $70.00
Issued: 8/22/00 Issued By: Susan
Contact Phone:651/481-2927
Comments: Business 10 8801629
.
State License:
Issued:
Expiration:
License Type: Business
Contact: Land O'Lakes
Local License: LiC2000-46
Expiration: 12/31/00
Total Fees: $200.00
Total Receipts: $200.00
Issued: 8/22/00 Issued By: Supervisor
Contact Phone:
Comments: Business 10 8801629
State License:
Issued:
Expiration:
License Type: Business
Contact: Alliant Techsystems, Inc.
Local License: LiC2000-47
Expiration: 12/31/00
Total Fees: $80.00
Total Receipts: $80.00
Issued: 8/22/00 Issued By: Susan
Contact Phone:651/931-5315
Comments: Business 10 1031564
State License:
Issued:
Expiration:
.
e
e
e
Business License Summary
For: 8/10/2000 through 8/24/2000
Printed:8/24/00
Page5 of 9
License Type: Business
Contact: Office Machines Sales &
Local License: L1C2000-48
Expiration: 12/31/00
Total Fees: $70.00
Total Receipts: $70.00
Issued: 8/22/00 Issued By: Susan
Contact Phone:651/464-1194
Comments: Business ID - MN-2594589
State License:
Issued:
Expiration:
License Type: Business
Contact: Sims Deltec
Local License: L1C2000-49
Expiration: 12/31/00
Total Fees: $40.00
Total Receipts: $40.00
Issued: 8/22/00 Issued By: Susan
Contact Phone:651/633-2556
Comments:
State License:
Issued:
Expiration:
License Type: Business
Contact: United Properties
Local License: L1C2000-50
Expiration: 12/31/00
Total Fees: $40.00
Total Receipts: $40.00
Issued: 8/22/00 Issued By:
Contact Phone: 6121359-3030
Comments: Business ID - 41-1655940
State License:
Issued:
Expiration:
License Type: Business
Contact: International Paper Co.
Local License: L1C2000-51
Expiration: 12/31/00
Total Fees: $49.00
Total Receipts: $49.00
Issued: 8/22/00 Issued By:
Contact Phone:651/636-3300
Comments: Business 10 0077398265-7
State License:
Issued:
Expiration:
License Type: Business
Contact: Edward D. Jones & Co.
Local License: L1C2000-52
Expiration: 12/31/00
Total Fees: $50.00
Total Receipts: $50.00
Issued: 8/15/00 Issued By:
Contact Phone:651/483-0859
Comments:
State License:
Issued:
Expiration:
Business License Summary
For: 8/10/2000 through 8/24/2000
Printed:8/24/00
Page6 of 9
e-
License Type: Business
Contact: Northwestern College
Local License: L1C2000-53
Expiration: 12/31/00
Total Fees: $50.00
Total Receipts: $50.00
Issued: 8/11/00 Issued By:
Contact Phone:651/631-5100
Comments: Business 10: 41-0711610
State License:
Issued:
Expiration:
License Type: Business
Contact: Catholic Aid Association
Local License: L1C2000-54
Expiration: 12/31/00
Total Fees: $60.00
Total Receipts: $60.00
Issued: 8/11/00 Issued By:
Contact Phone:651/490-0170
Comments: Business 10 41-0182070
State License:
Issued:
Expiration:
License Type: Business
Contact: China Wok Restaurant
Local License: L1C2000-55
Expiration: 12/31/00
Total Fees: $60.00
Total Receipts: $60.00
Issued: 8/14/00 Issued By:
Contact Phone:651/482-0442
Comments: Business 10 0021093464
It
State License:
Issued:
Expiration:
License Type: Business
Contact: Clean N' Press
Local License: L1C2000-56
Expiration: 12/31/00
Total Fees: $70.00
Total Receipts: $70.00
Issued: 8/15/00 Issued By:
Contact Phone:651/481-1711
Comments: Business 10 (MN-2015143) (FED 41-1590150)
State License:
Issued:
Expiration:
License Type: Business Issued: 8/22/00 Issued By:
Contact: Frattallone's Ace Hardware Contact Phone:651/484-3327
Local License: L1C2000-57 Comments: Business 10
Expiration: 12/31/00
Total Fees: $70.00
Total Receipts: $70.00
State License:
Issued:
Expiration:
e
.
Business License Summary
For: 8/10/2000 through 8/24/2000
Printed:8/24/00
Page7 of 9
License Type: Business
Contact: Sun Place Tanning Studio
Local License: L1C2000-58
Expiration: 12/31/00
Total Fees: $70.00
Total Receipts: $70.00
Issued: 8/22/00 Issued By:
Contact Phone: 651 /482-0395
Comments: Business 10 41-1681489
State License:
Issued:
Expiration:
License Type: Business
Contact: Northwestern College
Local License: L1C2000-59
Expiration: 12/31/00
Total Fees: $80.00
Total Receipts: $80.00
Issued: 8/16/00 Issued By:
Contact Phone:651/631-51 00
Comments: Business 10
State License:
Issued:
Expiration:
.
License Type: Business
Contact: Natale's Cafe. Inc.
Local License: L1C2000-60
Expiration: 12/31/00
Total Fees:$110.00
Total Receipts: $110.00
Issued: 8/22/00 Issued By:
Contact Phone:651/486-7770
Comments: Business 10 41-1867869
State License:
Issued:
Expiration:
License Type: Business
Contact: Line Orive Sports
Local License: L1C2000-61
Expiration: 12/31/00
Total Fees:$17000
Total Receipts: $170.00
Issued: 8/18/00 Issued By:
Contact Phone: 651/490-7898
Comments: Business 10 (MN 1964111/FED 41-1731035)
State License:
Issued:
Expiration:
.
License Type: Business
Contact: Big Ten Supper Club, Inc.
Local License: L1C2000-62
Expiration: 12/31/00
Total Fees: $380.00
Total Receipts: $380.00
Issued: 8/15/00 Issued By:
Contact Phone:651/633-7253
Comments: Business 1041-0830574
State License:
Issued:
Expiration:
.
Business License Summary
For: 8/10/2000 through 8/24/2000
Printed:8/24/00
Page8 of 9
License Type: Business
Contact: Presbyterian Homes
Local License: L1C2000-63
Expiration: 12/31/00
Total Fees: $1 ,082.00
Total Receipts: $1,082.00
Issued: 8/23/00 Issued By:
Contact Phone:
Comments: Business 10 - 41-1482075
State License:
Issued:
Expiration:
License Type:
Contact: Measuretech
Local License: L1C2000-64
Expiration: 12/31/00
Total Fees: $20.00
Total Receipts: $20.00
Issued: 8/23/00 Issued By:
Contact Phone:651/633-7651
Comments: Business 10 - 41-1567386
State License:
Issued:
Expiration:
License Type: Business
Contact: Arden Hills Texaco
Local License: L1C2000-65
Expiration: 12/31/00
Total Fees: $51 0.00
Total Receipts: $510.00
Issued: 8/21/00 Issued By:
Contact Phone: 651/536-9577
Comments: Business 1041-1518980
.
State License:
Issued:
Expiration:
License Type: Business
Contact: Firstar Bank of Minnesota,
Local License: L1C2000-66
Expiration: 12/31/00
Total Fees: $60.00
Total Receipts: $60.00
Issued: 8/10/00 Issued By:
Contact Phone:
Comments:
State License:
Issued:
Expiration:
License Type: Business
Contact: Flaherty's Arden Bowl
Local License: L1C2000-67
Expiration: 12/31/00
Total Fees: $945.00
Total Receipts: $945.00
Issued: 8/21/00 Issued By:
Contact Phone:651/633-1777
Comments: Business 1041-6028894
State License:
Issued:
Expiration:
.
.
.
.
Business License Summary
For: 8/10/2000 through 8/24/2000
Printed:8/24/00
Page9 of 9
License Type: Business
Contact: Star Liquor
Local License: L1C2000-68
Expiration: 12/31/00
Total Fees: $270.00
Total Receipts: $270.00
Issued: 8/15/00 Issued By:
Contact Phone: 763/566-4040
Comments: Business 10 41-0979082
State License:
Issued:
Expiration:
License Type: Business
Contact: Great Clips
Local License: L1C2000-69
Expiration: 12/31/00
Total Fees: $70.00
Total Receipts: $70.00
Issued: 8/24/00 Issued By:
Contact Phone: 651/482-8397
Comments: Business ID
State License:
Issued:
Expiration:
.
.
.
STATE OF MINNESOTA
COUNTY OF RAMSEY
CITY OF ARDEN HILLS
RESOLUTION 00-26
A RESOLUTION
REQUESTING RAMSEY COUNTY TO RESTRICT PARKING
ALONG A PORTION OF COUNTY ROAD I
WHEREAS, the County has planned the improvcment of County Road I from I-35W to Schutta
Road; and
WHEREAS, the County will be expending County Statc Aid Highway Funds (SAP. 62-603-
03) on the improvement of said strect; and
WHEREAS, the improvcment does not conform to the approved minimum standards as
previously adopted for such County State Aid Streets and that approval ofthe proposcd
construction as a County State Aid Street project must, therefore be conditioned upon ccrtain
parking restrictions; and
WHEREAS, the cxtent ofthese restrictions, that would be necessary prerequisite to the approval
of this construction as a County State Aid project in the City, has been determined.
NOW THEREFORE, BE IT RESOL YED that the City Council of the City of Arden Hills
rcquests Ramsey County to restrict parking of motor vehicles on the south side of County Road I
from 1-3 5W to Schutta Road.
PASSED AND ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS
THIS 28th DAY OF AUGUST, 2000.
DENNIS PROBST, MAYOR
ATTEST:
JOSEPH P. LYNCH, CITY ADMINISTRATOR
~
.
CITY OF ARDEN HILLS
MEMORANDUM
DATE:
August 24, 2000
SUBJECT:
Joe Lynch, City Administrator
Dw'Y" S"""n!, P,'b, W,d" Di='" .'9)
County Road E Street Light Poles
TO:
FROM:
Background
At the August 21,2000, City Council Work Session, the Council was provided evidence
ofthe deterioration of the 17 street light poles on County Road E. These poles are
between Lexington Avenue and Highway 51 and are owned and maintained by the City.
.
Council Direction
The City Council instructed staff to seek costs for reinforcing the bottom of those poles
and have the Opcrations and Finance Committee research other design options for
replacing the existing streetlights on County Road E in the near future. The Operations
and Finance Committee should provide a list of 2 or 3 design options and present this list
to the Planning Commission. Both committees will discuss the options jointly and
provide a recommendation to Council. This process would need to begin immediately to
insure the new streetlights will be installed in time for the City's 50-Year celebration.
Existing Street Li~ht Reinforcemcnt Costs
The Public Works Director has contacted Boe Ornamental Iron Inc. ofLino Lakes to
inspect the cxisting street lights and prcpare an estimate for reinforcing 16 of the 17 street
light poles on County Road E. The 17th pole, which had broken off previously, will bc
replaced by one that was removed years before during signalization ofthe intersection by
McDonalds. Thc attached estimate indicates a cost of $31 04. 00 for the reinforcing.
Recommendation
The Public Works Director has worked with Boe Ornamental previously with excellent
results and recommends that Council authorize staff to enter into an agreement with Boe
Ornamental Iron, Inc. to reinforce 16 City streetlight poles at a cost not to exceed
$3,104.00.
.
FROM
BOE ORNAMENTAL INC.
PHONE NO.
612 780 8274
Awg. 23 2000 06:38PM P1
e
BOE ORNAMENTAL IRON, INC.
484 Lilac Street
LIND LAKES, MN 55014
JOB ESTIMATl
(651) 780-2627
FAX (651) 780-8274
Tcf" ~-{ C2F"_~----t\11 IS
/lr-r-r",J ~ fZJA ~h''::::_ .4..... ~
,",~IOJ'\JI~
1L)~!i
~ ---7-> -~
1?""L~ f2.:=--=-- (f?_
JO(~ N~I:./LO(;"'fIO/U
L ~ 6:~-r
JOB DESCRIPTION:
>=~~~~=~~a::~-!:~-~?~~~~~t~,_-~~=:._:..
.._.~.............Jd.laH:.r-:".""'.""."".".~m......-,...~.L~....._..J.k'_..I..A.C-_..__..._..........._..........._....__....................._..._
..-.,._._~_.,..._-_._._-,----_...,-_.,-_.._._._._--_.-.-.....--.---..--..--__._._.._..._..H.....H.___.__-'____--.--.--.-----..-..........'...H...__.._.._.H..........._..._._..__........._.._._.
.,......."....".,._,-...._._-"....~_......'.-
H'_'''''--H"...''h_",'''''.."".._H' ... ............,... ,,,.,. "",,,"''''''0... ..--............."."".-"'......_",......_....., ........--...............w'......H...._...__...H..........H._....__._.'''''--''_'_'''''''''_'''''_'M''''_m_
... -..............--..-..-..--..-.-..--.--.-----..---,.......-
C."_.c:d....I?:f!::~~i?_.........................:&.>.o .............-:::t.~..J.2.e.............w.B~ .....<2If...r'- ...K..s.......,,_._~.
e
........_~".,,,m,~"WU,,".mu~,~~,,_,..~....n..':".-.._.-_-
......"...._._.'.._n..~........_.....v,"~..,."'~..""......."..,,.~...,_~,.."."".."".,."'.."....."".".,...,,,.
.... ".....m.'.~....-.....n....m.~.'.'.....""......,.....'~"..~.H'~~........___
:>
""........",.".,...."....",............""".'.,,'.....N."..'. "................._......,..._..
..... ...-..---.-....-..--...-.-.....,.......-.-..-.--..-.___......_"..__....._ ....... n...... ...__
.....".....__._m___....__......_...._.........__m._..._...._.__._
41,s E:STlMATE IS FOR COMPLETING THE JOB AS DeSCRIBED ABOVE
IT IS SAsEDON.QUR EVALUATION AND OOE:S NOT INCLUDE MATEI11AL
PRICE INCREASES OR ADDITIONAL LABOR AND MATERIALS WHICH
MAY. BE REQUIRED SHOULD UNFORESEEN PROBLEMS OR ADVERSE
WEATHE:RCONDITIONS ARISE AFTER THE: WORK HAS STARTED.
E:STIMATED. ...tP s 10+ "dO
JOBC0$T ~ - fi _
:~TIMATED ~~ _ j yz;.~
Planning Case #00-17 c
United Properties, PUD Amendment
1887 and 1987 Gateway Blvd.
...",
_,.::..~:__---:.,~.=~._:..-..o:..,
--~_..._..._--_...._~ ---'--
\)
~
----
Q
1000
,
o
1000
2000 Feet
,
00
e
CITY OF ARDEN HILLS
MEMORANDUM
DATE: Augnst 14, 2000
TO: Mayor and City Conncil
FROM: Jennifer Chapnt, City Planner~ .
SUBJECT: Case #00-17c, Planned Unit Development (PUD) Amendment
United Properties, 1987 and 1887 Gateway Blvd
ReQnest
The applicant is requesting to amend the POO for the above listed properties to request
administrative approval on the following items: increasing the percentage of the
allowable office build-out square footage for each property; and relocation and
replacement or striping of additional parking spaces.
e
Backl!round
As of July 1, 2000, the management company for the abovc listed properties changed to
United Properties from Welsh Companies. The Plamling Commission tabled Planning
Case #00-17c at the July 5, 2000 Plamling Commission meeting due to the changc in
management and lack of representation. Since that time, the sixty day time limit was
waived by the previous applicant and the current management company was contactcd
and expressed his desire to continue with the application.
On Scptember 22, 1997, the City Council approved Planning Case #97 -06, POO Master
Plan and Final Plan (including variances), prcliminary and final plat, and street vacation
for the construction ofthrcc office/industrial buildings, addressed 1787, 1887 and 1987
Gateway Blvd. Included for background information are as follows: Staff review and
recommendation of the application to the Plarming Commission, datcd July 2, 1997
(Exhibit A) and rclevant attachments (Exhibit B); thc Plarming Commission's
rccommendation to the City Council, dated July 14, 1997 (Exhibit C); final City Council
action on the application (Exhibit D).
The Planning Commission heard this request at the April 5, 2000, Planning Commission
meeting as Planning Case #00-17. At that timc, the requcst was tabled pcnding further
information from the applicant. The Planning Commission rcviewed this request a
second timc as Plarming Case #00-17b at the Junc 7 meeting. A rccommendation was
made on all but two items, pending further information from staffregarding the
development agreement. The remaining two items becamc Plarming Case #00-17c.
.
The following is a list of past plarming cases that have been heard for the threc Gateway
Blvd. properties:
Plannin Case
99-23
99-21
99-20
00-17a
00-17b
(A) Approved (D) Denied
Re uest
Additional Parkin
Trash Com actor
Si Modification.
Catalytic oxidizer, solvcnt storage
tanks, dock door enlar ement
Administrative approval for:
enlarging dock doors; installing
drive-in ramps/platforms;
installina windows
CC Action
A
A
A
A
.
A
Review
Two requests were caJried over from the previous planning casc (PC #00-17b) for
administrative revicw considcration at 1987 and 1887 Gateway Blvd.:
1. Increasing the percentage of allowable office build-out square footage per property
The original PUD, approved in Planning Casc #97-06 (see Exhibit E for site plan),
specified parking requircmcnts for the three buildings on Gateway Blvd. that were
proposed by Welsh Companies. Since it was unknown who the tenants would be of these
buildings at tbat time, a presumption was made on the ratio of office to warehouse within
thc buildings. The PUD was approved with the requiremcnt that each of the three .
buildings have 20% office space aJld 80% warehouse space.
In Section VI (F) #1 (j) of the City's Zoning Ordinance requires office users to provide
one parking space for each 250 square feet of gross floor area and industrial users to
providc one parking space for each 1,000 square feet of gross industrial space provided.
The following is the anlOunt of parking that was required for each propcrty at the time the
PUD was approved:
1987 Gatewa Blvd.: Plannin Case #97-06
Use Square Feet Parking Ratio Parking
Re uired
84 s aces
84 s aces
Total 104,532 s . ft. 168 s
*The required parking was reduced through thc approval process.
1887 Gatewav Blvd.: Plannin Case #97-06
Square Feet Parking Ratio Parking
Re uired
91 s aces
91 s accs
182 s aces
Use
2
Parking
Provided
164* s aces
Parking
Provided
189 s aces
.
.
Planning Casc #99-23 (Exhibit F) amended the parking requircments for thc propcrty at
1987 Gateway Blvd. from the original PUD to allow for a greater percentage of office to
warehouse.
Use
Case #99-23
Parking
Required
143 s aces
69 s aces
212 s aces
Parking
Provided
214 s aces
As a result ofreviewing the original PUD, it appears that each of the buildings were set
up with thc proper amount of parking for 20% office and 80% warehouse. If the office
component was to expand within one building, the amount of parking would need to
expand ,md there just is not sufficient room on site to accommodate this. In my opinion,
this would require further review by the planning commission and could not be approved
administratively due to the site constraints. Also, Section VI (F) #1 (f) states that proof
of parking may be shown ifthe number of parking spaces (by the ordinance) are not
required by the use, requiring approval from the Planning Commission and the City
Council.
.
Although these buildings were all devcloped together, parking requirements for each
building are calculated separately. Each building is only pcrmitted to have 20% office and
80% warehouse, with the exception ofthe property at 1987 Gatcway Blvd which is
permitted 34% officc and 66% warehouse by a variance granted following the
construction of the buildings. Staff does not recommend that changes to the allowable
officc build-out square footage be made administratively.
2. Relocation and replacement or striping of additional parking spaces
Relocating parking on a site to accommodate minor changes should be attainable at an
administrative leyeJ. Staff can review relocation and parking space striping to ensure that
it mcets the zoning and building code. Ifthe requcst does not meet the minimum
requircments of the codes (ex. Landscape requirements) as a result of the request thcn the
applicant would need to go before the Planning Commission. Staff would recommend
that the relocation and replacement or striping of additional parking spaces for these
propcrties be permitted administratively.
.
Deadline for A!!cncv Actions
The City of Arden Hills received a complete application for this request (PC#00-17) on
March 9, 2000. Pursuant to Minnesota State Statute, the City must act on this request by
May 8, 2000 (60 days), unless the City providcs the petitioner with written reasons for an
additional 60-day review pcriod. A letter was sent to the applicant, extending thc review
period and additional sixty days to July 7, 2000. A letter was also scnt to the City
waiving the sixty-day time limit on this application on July 7, 2000.
3
Lastly, ifthe City denies the petitioncrs' request, "... it must state in writing, the reasons
for denial at the lime that it dcnies the request"
.
Options
1. Recommend approval as submitted.
2. Recommend approval with conditions.
3. Recommend denial with reasons for denial.
4. Table for additional information.
Updates
None at this time.
Recommendation
For Planning Case #00-17c, Planncd Unit Developmcnt Amendment for the propcrties at
1987 and 1887 Gateway Blvd., the Planning Commission recommends that:
1. Administrative approval to changes in the allowable office build-out square footage
for thc propcrty at 1887 Gateway Blvd. is permitted for up to 25% office and 75%
warehousc on the condition that if staff docs not feel comfortable with the requcst for
any reason, the applicant must go before the Planning Commission.
2. The property located at 1987 Gateway Blvd. was grantcd a variance in Planning Case
#99-23 to allow 34% office and 66% warehouse with no changes being madc to this
variance as a result of this planning case.
3. Administrativc approval of rclocation and replacement or striping of additional .
parking spaces for the propertics at 1887 and 1987 Gateway Blvd. is permitted on thc
condition that if thc staff does not feel comfortable with the request for any reason,
the applicant must go before the Planning Commission.
.
4
.
--
--
~oo~ l-:t Ci
Brftlt>l1 A
~ '
JO
CITY OF ARDEN IDLLS
MEMORANDUM
DATE:
July 2, 1997
TO:
Planning Commission
FROM:
Kevin Ringwald, Community Development Director
SUBJECT:
Case #97-06, PUD Master and Final Plans (including variances),
Preliminary and Final Plats, and Street Vacation
Welsh Companies, 4000 Round Lake Road
Request
The applicant is requesting approval of a Planned Unit Development (PUD) Master Plan and
Final Plan (including variances), preliminary and fmal plat, and a street vacation to facilitate the
construction of a three phase office/industrial project consisting of a 104,532 square foot
building (phase II), 113,524 square foot building (phase III), and a 111,972 square foot building
(phase IV) on a 31.76 acre site zoned Gateway Business (Exhibit A).
Background
The Gateway Business (GB) zoning district was adopted in 1988, after a lengthy study by the
Planning Commission. The Planning Study For NE I-694/I-35W was the basis for the zoning
district which was adopted. The property within the OB district was viewed upon at that time as
being the last major undeveloped parcel in the City and its most visible. Consequently, it
represented an opportunity to maximize the return of the City's invested assets and enhance the
image of the City as a fme place to live and work.
The Zoning Ordinance in Section V, D, 9, states that the purpose of the Gateway Business
zoning district is as follows:
a.
To implement that part of Arden Hills Comprehensive Development Plan known as the 1-
694/I-35W Plan;
To promote high quality, unified, large scale development in a manner similar to a
planned unit development;
To take full advantage of the site's location as documented and described in the I-694/I-
35W Plan;
To allow only development that will create an attractive environment and a positive
image for this site which is one of the most visible in the community and represents the
City's last major development site;
To protect the site's environmental resources;
To promote flexibility in land uses and development standards to achieve the objectives
of the I-694/I-35W Plan; and
To allow development that will insure reasonable traffic operation on the internal and
surrounding transportation systems.
b.
c.
d.
e.
f.
g.
e
e
-
?-f1O
Surroundinl! Area
,
Direction Land Use Plan Zoning Current Use
North Industrial GB Phase I Arden Hills Interstate
Center (planning Case 96-12)
East Industrial GB Vaughn Towers property
South Industrial GB A TS Steel and Vacant
(across railroad spur)
West Interstate 35- W
(across Round Lake Road)
.
Site Data
Land Use Plan: Industrial
Zoning: Gateway Business (GB)
Current Use: Vacant
Size: 31.76 acres
Topography: 42 feet, Northeast (932) to Southwest (890) respectively
Soils: Hayden Kingsley Complex, well drained and moderately permeable, 3-15% slopes; and
Hayden fine sandy loam, well drained and moderately permeable, 6-12% slopes
Vegetation: Wooded, mature hardwood adjacent to Round Lake, pioneer species on remainder
Floodplain: Northeast corner adjacent to Round Lake (elevation of 893) according to FEMA
Wetland: Eight (8) isolated basins, per Wetland delineation (Exhibit B)
Shoreland: Round Lake (DNR 62-70), Recreational Development
Truck Access: Interstate 35W, Interstate 694, and U.S. Highway 10, via Highway 96
.
PUD - Master & Final Plan
1. Access. The Phase II building has four points of access. Two access points (one parking
and one delivery) are provided by the cul-de-sac, while other two access points are
provided via the relocated 14th Street (both parking).
The Phase III building has two points of access. The two points of access (one parking
and one delivery) are both located off of the relocated 14th Street.
The Phase IV building has two points of access. The two points of access (one parking
and one delivery) are both located off of the relocated 14th Street
2.
Circulation. The PUD does a good job of separating the delivery circulation
requirements from the employee and visitor parking circulation areas on all phases of the
project.
.
.
.
.
'() / 1G
3.
14th Street (relocated). As a part of the development of the GBD, it has been
anticipated that 14th Street (aka, Butcher's Street) would be relocated to the south to
provide access and act as a land use transition between the office/industrial uses to its
north and the office uses to it south. Given, that rail users were not anticipated within the
GBD, the City was hopeful that the existing right-of-way for the railroad spur could be
used for this purpose. However, the owner of the railroad spur (MT Properties) is not
currently willing to sell the right-of-way. Therefore, the relocated road is being planned
to be located to the north of the railroad right-of-way.
4.
Vacation of 14th Street. If 14th Street is relocated to the south edge of this project, then
that portion of the existing 14th Street which is not required for this development should
be vacated. 14th Street is currently is a dirt trail which currently services (Exhibit C) the
Phase I building, the Pentair property (purchased by Welsh Companies), the Naegele
property (being purchase by the City), the Harstad property (purchase agreement by
Welsh Companies, closing mid-July), the City of Arden Hills property (closing end of
July), the Truhler/Zafke parcel (Welsh Companies, closing mid-July), and the Vaughn
Towers property (not part ofthis development proposal). Given, that the intent of this
proposal is for Welsh Companies to purchase all of these properties, except for the
Vaughn Towers property, the relocated 14th Street will work. However, the access for
the Vaughn Towers property will have to replicated off of the east end of the relocated
14th Street to ensure that access to this property is maintained.
The applicant is not proposing to vacate all of the existing 14th Street right-of-way, some
of the right-of-way will be retained for a short cul-de-sac (Gateway Court) which will
service the delivery needs of the Phase I and Phase II buildings. The cul-de-sac does not
provide for boulevard or setback area for the delivery area on Phase II. The lack of this
area does cause Staff concern for snowplowing and general maintenance. It is likely that
the Staff and the developer could come to verbal agreement on the treatment and
responsibilities for these areas. However, the Staff is concerned about the interpretation
of these verbal agreements over time with either new Staff or new owners. The applicant
is currently working on language to be included as a covenant on the property which may
solve these issues. The applicant stated that the language for inclusion into this document
will be available for review before or at the meeting.
5.
Road names. The Staff would prefer that the new roads located within this development
not be called either 14th Street nor Butcher's Street. If the Planning Commission has any
preferences or guidance in this area, then the Staff would appreciate receiving it.
Otherwise, the Staff will direct the applicant to propose a street names (relocated 14th
Street) prior to City Council consideration of the final plat.
6.
Parking. The Zoning Ordinance in Section VI, F, I, j, requires office users to provide
one parking space for each 250 square feet of gross floor area and industrial users to
provide one parking space for each 1,000 square feet of gross industrial space provided.
The following summarizes the relationship of the required parking spaces to those that
are provided:
e
e
e
'1/ ?-f.
Iq~ /_~.. ,/,\,j ~\..l/P
Phase II Building (104,532 Square Feet)
Use Square Feet Parking Ratio Parking Required Parking Provided
Office 20,906 sq.ft. . I p.s. per 250 sq.ft. 84 p.s. 168 p.s.
Industrial 83,626 sq.ft. 1 p.s. per 1000 sq.ft. 84 p.s.
Total 104,532 sq.ft. NA 168 p.s. 168 p.s.
.
Phase III Building (113,524 Square Feet)
Use Square Feet Parking Ratio Parking Required Parking Provided
Office 22,705 sq. ft. I p.s. per 250 sq.ft. 91 p.s. 196 p.s.
Industrial 90,819 sq.ft. I p.s. per 1000 sq.ft. 91 p.s.
Total 113,524 sq.ft. NA 182 p.s. 196 p.s.
l~'" Gr~WfN p,t,..Vp.
Phase IV Building (111,972 Square Feet)
Use Square Feet Parking Ratio Parking Required Parking Provided
Office 22,394 sq.ft. I p.s. per 250 sq. ft. 90p.s. 186 p.s.
Industrial 89,578 sq.ft. I p.s. per 1000 sq.ft. 90p.s.
Total 111 ,972 sq.ft. NA 180 p.s. 186 p.s.
.
7.
Traffic Impact Study. The Zoning Ordinance in Section V, K, 5, f, requires that both <.-/
internal and external traffic and parking plans and traffic generation studies prepared by a
registered traffic engineer will be required for all projects within the GB district.
-'"
The applicant has had a registered traffic engineer prepare a traffie impact study to
analyze the potential impacts of this proposed development. The applicant states in
Exhibit A, page 12 of 47, paragraph 4, that "... the project will have no significant
impacts on the signalized intersection at County Highway 96 and Round Lake Road...".
8.
Highway 96 (Ramsey County reconstruction). Ramsey County is currently
reconstructing Highway 96 from l-35E in White Bear Township to Old Highway 8 in
New Brighton. The section of Highway 96 in Arden Hills from Lexington Avenue to
Highway 10 is scheduled for reconstruction in the year 2000, although there is some
discussion that it may occur later.
.
.
.
--
0/10
Highway 96 from Highway 10 to Old Highway 8 is planned for reconstruction in 1998.
Although there is some discussion by Ramsey County that the bridge over Interstate 35W
will be reconstructed in 1998 and the roadway will be reconstructed in 1999. The
reconstruction plans (Exhibit D) include relocating the Round Lake Road intersection
with Highway 96 as far east as possible at a full movement intersection (signalized when
warranted).
As with most things, in development timing is everything. As the Traffic Engineer has
stated, in Exhibit A, page 12 of 47, paragraph 4, that "... the project will have no
significant impacts on the signalized intersection at County Highway 96 and Round Lake
Road...". However, the intersection of Round Lake Road and Highway 96 has not yet
been relocated nor signalized. Therefore, linkage is required between the approvals
granted in this request and the completion of certain minimum improvements on Round
Lake Road to facilitate those approvals.
9.
Building Design. The Zoning Ordinance in Section V, K, 5, d, (2), states that exterior
building treatment (wall surfaces) shall be of brick, stone, glass, or any combination
thereof, except trim and accessories may be metal. However, the exterior materials of the
proposed structure do not consist of brick, stone, or glass. The proposed exterior consists
of approximately 30 percent brick (on the bottom) and a painted smooth finish insulated
concrete panel with architectural reveals (ie., saw cut into the panel to provide visual
depth and delineation). The principal exterior colors of the building would be soft earth
tones (ie., off-white, tan, browns, etc.,). The exterior of the Phase II, III, and IV buildings
are similar to the Phase I building, with the addition of brick on the bottom and a slightly
different entry element.
The City Council when it reviewed the Phase I development of the Arden Hills Interstate
Center in Planning Case 96-12, accepted a building exterior which was not consistent
with the GB district requirements. The rationale was that there would be a increased
aesthetic progression as one got closer to the intersection ofInterstate 694 and 35W.
Also, that the first building would be the trigger for future development in the area.
The Phase I building is now almost complete and the Staff would encourage the Planning
Commission to visit the structure and to evaluate the relative aesthetics of the structure.
The Staff is generally pleased with how the aesthetics of the Phase I building turned out
relative to the "artists sketch" that was reviewed as part of Planning Case 96-12. The part
that was most positive for Staff was the that the additions required by the Planning
Commission to the west side of the building (facing Interstate 35W) improved the
aesthetics of the building. Another positive aspect was that the dock doors in the loading
area are not as massive or imposing as originally thought. The part that was not so
positive for Staff was that the "finished exterior" should have wrapped further around the
side of the building (southwest and southeast corners of the building) onto the rear of the
building (close to the first dock doors).
"
e
I
l;(JO
10.
Height. The Zoning Ordinance in Section V, F, 4, states that the maximum height ofa
structure in the GB zoning district shall be 35 feet. The proposed structure has a
maximum height of33 feet.
.
11. Floor Area Ratio. The Zoning Ordinance in Section V, K, 5, a, (4), (b), states that the
maximUTU Floor Area Ratio (FAR) for a parcel in the GB zoning district shall be 0.3. The
applicants Phase II building would provide for an FAR of 0.323 (104,532 sq.ft. / 323,544
sq. ft.). The applicants Phase III building would provide for an FAR of 0.292 (113,524
sq. ft. / 388,714 sq. ft.). The applicants Phase IV building would provide for an FAR of
0.206 (111,972 sq. ft. / 544,255 sq. ft.). The applicants Phase II, III, and IV buildings
would provide for a total FAR of 0.263 (330,028 sq. ft. / 1,256,513 sq. ft.).
The Zoning Ordinance in Section V, K, 5, a, (4), allows for the FAR of individual lots in
a mixed use project to vary from the requirement (0.3) as long as the overall FAR is
within the requirement. The FAR of the Phase II building is 0.323 which is greater than
0.3. However, the overall FAR of the project is 0.263 which is less than the maximum.
12.
Landscape Lot Area. The Zoning Ordinance in Section V, K, 5, a, (4), (b), states that
the minimum landscape lot area for a parcel in the GB zoning district shall be 35 percent.
The applicants Phase 11 building would provide for a landscape lot area of25.3 percent
(81,886 sq. ft. / 323,545 sq. ft.). The applicants Phase III building would provide for a
landscape lot area of36 percent (139,900 sq. ft. / 388,714 sq: ft.). The applicants Phase
IV building would provide for a landscape lot area of 54 percent (293,973 sq. ft. !
544,255 sq. ft.). The applicants Phase II, III, and IV buildings would provide for a total
landscape lot area of 41 percent (515,758 sq. ft. ! 1,256,513 sq. ft.).
.
The Zoning Ordinance in Section V, K, 5, a, (4), allows for the Landscape Lot Area of
individual lots in a mixed use project to vary from the requirement (35%) as long as the
overall Landscape Lot Area is within the requirement. The Landscape Lot Area of Phase
II is 25.3 percent which is less than 35 percent. However, the overall Landscape Lot Area
of the project is 41 percent which is greater than the minimum of35 percent.
13.
Setbacks. The Zoning Ordinance in Section V, K, 5, b, (4), states that the minimum
building setback for a parcel in the GB zoning district shall be 50 feet from all streets and
project boundaries and 20 feet from all interior property lines. The following summarizes
the relationship of the required building setbacks and those that are proposed:
Phase II Building Setback Setback Required Setback Provided
Front Yard (Round Lake Road) 50 feet 150 feet
Rear Yard (East) 20 feet 20 feet
Side Y 3rd (North) 50 feet 90 feet
Side Y 3rd (relocated 14th Street) 50 feet 85 feet
.
. .
1/1)0
.
Phase III Building Setback Setback Required Setback Provided
Front Yard (Relocated 14th Street) 50 feet 63 feet
Rear Yard (North) 50 feet 68 feet
Side Yard (West) 20 feet 85 feet
Side Yard (East) 20 feet 140 feet
Phase IV Building Setback Setback Required Setback Provided
Front Yard (Relocated 14th Street) 50 feet 57 feet
Rear Yard (North) 50 feet 82 feet
Side Yard (West) 20 feet 137 feet
Side Yard (East) 20 feet 120 feet
-
The Zoning Ordinance in Section V, K, 5, e, states that the minimum parking setback is
50 feet from any right-of- way line and 20 feet to any other property line. The City Code
(Shoreland Ordinance) in Section 20.5-43, (I) and (2), states where feasible and practical
the parking setback shall be the structure setback and in no instance shall the parking
setback be less than 50 feet from the Ordinary High Watermark (Round Lake). The
following summarizes the relationship of the suggested parking setbacks, required
parking setbacks and those setbacks as proposed by the applicant:
Phase II Parking Setback Setback Setback Setback
Suggested Required Provided
Right-of-Way (Round Lake Road) na 50 feet 72 feet
Rigbt-of-Wa)' (Gateway Court) na 20 feet o feet
Property Line (North) na 20 feet 50 feet
Property Linc (East) na 20 feet 20 feet
.
Phase III Parking Setback Setback Setback Setback
Suggested Required Provided
Right-of-Way (Relocated 14th Street) 50 feet 50 feet 50 feet
Property Line (Round Lake-OHW ) 75 feet 20 feet 140 feet
Property Line (West) 50 feet 20 feet 20 feet
Property Line (East) 50 feet 20 feet 1 0 feet
-
I
I
t7/ JO
Phase IV Parking Setback Setback Setback Setback
Suggested Required Provided
Right-of-Way (Relocated 14th Street) 50 feet 50 feet 58 feet
Property Line (Round Lake-OHW) 75 feet 20 feet 144 feet
Property Line (West) 50 feet 20 feet 1 0 feet
Property Line (East) 50 feet 20 feet 33 feet
e
The suggested setback is from the Shoreland Management regulations (Chapter 20.5 of
the City Code) and is designed to pull parking lots as far from water bodies as possible.
The west and east parking setbacks for Phases 1lI and IV do not meet the suggested
setback, but they are also not adjacent to the water body (ie., Round Lake). Therefore,
the Staff is comfortable with the setback being provided.
14. Grading. The applicant has provided a grading, drainage and erosion control plan for the
proposed building. The Rice Creek Watershed District (RCWD) has approved the
proposed grading plan (Exhibit E).
The development of this site will disturb more than five (5) acres ofland. Therefore, the
developer is required to receive a General Construction Storm Water Permit from the
Minnesota Pollution Control Agency (MPCA). These permits are required pursuant to
the National Pollutant Discharge Elimination System (NPDES) which is administered by
the Federal Environmental Protection Agency (EPA). The purpose of the permit is to
ensure that the grading plan includes and that the contractor carries out Best Management
Practices (BMP's), as it pertains to erosion and sediment control.
e
The City Engineer has reviewed the grading plans and has offered his comments (Exhibit
F). The City Engineer has raiscd several concerns and points of clarification regarding
the grading plan. The applicant is in the process of preparing a reply to this letter and it
will be available for your deliberations. The applicant did respond to one of the City
Engineers points of clarification regarding the location of a particular easement (Exhibit
G).
15.
U.S. Army Pipeline Easement. The U.S. Army currently has a pipeline (12 inch-
natural gas) easement through the western portion of the Phase II property. The pipeline
supplied natural gas from Minneapolis to the Twin Cities Army Ammunition Plant
(TCAAP). The U.S. Army no longer requires thc pipeline and is in the process of
vacating the easement.
.
-
.
.
i1Jx
16.
Wetlands. The property contains eight jurisdictional wetlands (isolated basins). The
Rice Creek Watershed District has approved the wetland replacement plan on behalf of
the State of Minnesota (Exhibit E) and the U.S. Army Corps of Engineers approval is
anticipated.
17. Shoreland Ordinance. The subject property is located in the Shoreland Management
area, per the Minnesota Department of Natural Resources (DNR). The City Code in
Chapter 20.5-22, Subpart 12, a, defines Shoreland as land located within 1,000 feet from
the ordinary high water mark oflake, pond, or flowage. The subject property is within
1,000 feet of Round Lake, a DNRprotected water.
The City Code in Chapter 20.5-47, (a), (I), permits the selective removal of natural
vegetation, provided that sufficient vegetative covers remains to screen cars, dwellings
and other structures when viewed from the water. The project should not be visible from
Round Lake given, the topography of the area. The City Code in Chapter 20.5-47, (b),
allows for grading and excavation in shoreland areas. If a permit is granted to grade and
excavate in a shoreland area, then the permit is required to be conditioned on the
following:
a.
b.
The smallest amount of bare ground is exposed for as short as time as feasible;
Temporary ground cover, such as mulch, is used and permanent ground cover,
such as sod, is established;
Methods to prevent erosion and trap sediments are employed; and
Fill is stabilized to accepted engineering standards, approved by the city engineer.
c.
d.
18. Landscaping. The proposed landscaping contains a variety of deciduous and evergreen
trees and shrubs. The site is required to have a minimum total caliper inches of trees
provided per the Zoning Ordinance (Appendix A, page 27 and 28). The minimum
amount is calculated by dividing the gross square footage of the building by 320. The
relationship of the landscaping required to that which is being proposed can be
summarized as follows:
Phase II @ 104,523 Square Feet
Caliper J nches Pcrcentage Caliper Inches
. Required Required
2" to 3" 50 percent 164 inches
3.5" to 4" 30 percent 97 inches
4.5" to 5" 20 percent 66 inches
Total 100 percent 327 inches
e
Phase II @ 104,532 Square Feet
Caliper Total Caliper Total Caliper Code
Inches Inches Required Inches Provided Differential
2" to 3" . +85.5 inches
164 Inches 249.5 inches
3.5" to 4" 97 inches 35 inches -62 inches
4.5" to 5" 66 inches 30 inches -36 inches
Total 327 inches 314.5 inches -12.5 inches
e
Phase III @ 115,575 Square Feet
Caliper Percentage Caliper Inches
Inches Required Required
2" to 3" 50 percent 181 inches
3.5" to 4" 30 percent 108 inches
4.5" to 5" 20 percent 73 inches
Total 100 percent 362 inches
Phase III @ 115,575 Square Feet
Caliper I Total Caliper Total Caliper Code
Inches Inches Required Inches Provided Differential
2" to 3" 181 inches 193.48 inches + 12.48 inches
3.5" to 4" I 08 inches 24.5 inches -83.5 inches
4.5" to 5" 73 inches 25 inches -48 inches
Total 362 inches 242.98 inches -119.02 inches
I
Phasc IV @ 111,779 Square Feet
Caliper Percentage Caliper Inches
Inches Required Required
2" to 3" 50 percent 1 75 inches
3.5" to 4" 30 percent 105 inches
4.5" to 5" 20 percent 70 inches
Total 100 percent 350 inches
!o/w
.
.
.
tit
.
.
lV70
Phase IV @ 111,779 Square Feet
Caliper Total Caliper Total Caliper Code
Inches Inches Required Inches Provided Differential
2" to 3" 175 inches 163.47 inches -11.53 inches
3.5" to 4" 105 inches 28 inches -77 inches
4.5" to 5" 70 inches 25 inches -45 inches
Total 350 inches 216.47 inches -133.53 inches
Phases II, III, and IV @ 331,886 sq. ft,
Caliper Perccntage Caliper Inches
Inches Required Required
2" to 3" 50 percent 520 inches
3.5" to 4" 30 percent 31 0 inches
4.5" to 5" 20 percent 209 inches
Total 100 percent 1,039 inches
Phases II, III, and IV @ 331,886 Square Feet
Caliper Total Caliper Total Caliper Code
Inches Inches Rcquired Inches Provided Differential
2" to 3" 520 inches 606.45 inches +86.45 inches
3.5" to 4" 310 inches 87.5 inches -222.5 inches
4.5" to 5" 209 inches 80 inches -129 inches
Total 1,039 inches 773.95 inches -265.05 inches
The applicant is proposing to save existing vegetation adjacent Round Lake, which they
may receive credits for. However, the number size, and species of those plants to be
saved have yet to be identified by the applicant so the preservation credit calculation
cannot be made at this point in time.
19.
Refuse. The Zoning Ordinance in Section VI, G, 3, b, (1), requires that all exterior
storage shall be screened from public view. The site plan does not provide for any trash
enclosures. The location and style of the trash enclosures should be provided for in the
plans.
-
-
-
I?--JIO
20.
Signage. The Zoning Ordinance in Section V, K, 5, g, (1), requires that a sign plan be
submitted in conjunction with site plans in the GB district that show the location, type,
size and design of the individual signs. The applicant is proposing one Area
Identification Sign with each of the three phases. However, the size and design of the
sign have not been included in the submittal. Also, the applicant is providing for two
business signs which are 60 square feet in area at each of the four entries to the building
for a total of 480 square feet of signage on the building (60 sfx 2 signs x 4 entries) which
is less than 10 percent of the buildings facade as required by the Sign Ordinance,
Schedule VII, B, 1.
.
21. Rooftop Mechanical. The Zoning Ordinance in Section VI, E, 4, j, requires that all
rooftop mechanical equipment shall be screened so as to prevent direct viewing of said
equipment. The rooftop mechanical equipment will consist oflow profile units painted to
match the buildings exterior and are located such that they will be screened to prevent
direct viewing.
22. Lighting. The Zoning Ordinance in Section V, E, 3, a, b, and c, states that the lighting
shall be directed away from adjacent properties, the source of illumination shall be
concealed, and the intensity oflighting from developments shall not exceed one
footcandle onto public right's-of-way. The applicant is proposing to use quick cut-off,
shoe-box type lumenajres which would meet the Code requirements.
23.
Environmental Assessment Worksheet (EA W). Given, the size of the project (phases
I, II, III, and IV are in excess of 300,000 square feet) an EA W was required to prepared
pursuant to Minnesota Rules, Chapter 4410. An EA W has a 30 day comment period.
The comment period for this EA Wends on July 2, 1997. Therefore, the Planning
Commission will have all the public comments, and hopefully all of the applicants
responses, available for your deliberations. The Staffhas included in your packet a copy
of the EA Wand all public comments which have received to date, including applicant
responses, if any.
.
24. Indirect Source Permit (ISP). The project (Phases I, II, III, and IV) does not contain an
adequate number of parking spaces (ie., greater than 1,000) to fall under the jurisdiction
and therefore require and ISP (Exhibit H).
Variances
A. General Ordinance Requirement.
The conditions required for the approval of a variance are found in Section VIII, D, 4, c,
of the City Code which states the following: "Adherence to the provisions of this
ordinance is required except for special cases which arise because of the configuration of
a particular parcel. The condition shall not have been created by the landowner. A
variance or variances may be granted from specific provisions of this ordinance because
such land factors as length of a side of a lot, the shape of the lot or the unusual terrain
prohibit reasonable development equivalent to that which would be permitted without
variance on a similar size lot located in the same district, but which lot has no unusual
configuration. Economic conditions alone shall not be grounds for a variance."
.
.
.
II
t?JI'JO
B.
Other Zoning Ordinance Requirements.
1. The variance shall not impair the health, safety, comfort and general welfare of
the public;
2. The variance shall not be contrary to the intent and purpose of the Comprehensive
Plan, Official Map or any ordinances of the City;
3. Variances shall not allow a use in a district that is not otherwise allowed; and
4. The Council may impose conditions in the granting of variances to insure
compliance and protect adjacent properties.
C. Other criteria or conditions often associated with variances.
1.
Previous eases of a similar nature which have been reviewed by the City, whether
the action taken was for approval or denial;
The variance should not be greater than necessary to accomplish the landowner's
objective;
Existence of alternative locations, development concepts or space requirements
which require consideration;
The variance would allow a condition that is consistent with the surrounding
development (Was an area developed under standards different than current
regulations would allow or in an era that had different requirements). The State
Statutes state in Chapter 462.357, Subpart 6, (2), the variance, if granted, will not
alter the essential character of the locality (neighborhood);
Conforming to the literal provisions would result in an "undue hardship" such that
the property could not be put to a "reasonable" use and "...economic
considerations alone shall not constitute an undue hardship";
The variance would improve an existing non-conforming condition and ordinance
compliance without major demolition and reconstruction would be impossible;
and
The variance will not impair an adequate supply of light and air to adjacent
property, or substantially increase the congestion of the public streets, or increase
the danger of fire, or endanger the public safety, or substantially diminish or
impair property values within the neighborhood.
2.
3.
4.
5.
6.
7.
Action to approve or deny a request for a variance should contain specific reference to
any of the above requirements or criteria that apply.
D. Requested Variances (see Exhibit A, pages 9, 10, and 11 of 47).
1. Minimum office component requirement within each office/warehouse building
reduced from 25 percent to 10 percent.
2.
Minimum landscape area requirement for the Phase II development reduced from
35 percent to 25.3 percent (Exhibit I).
e
e
I
l'i/Q(J
3.
Minimum front yard parking setback for the Phase II development reduced from
50 feet to 13 feet (Exhibit 1).
.
4. Minimum side yard parking setback for the Phase III and IV building loading
dock/service areas reduced from 20 feet to 10 feet (Exhibit K).
5. Allowable building finish expanded from stone, brick, and glass to also include
pre-cast, insulated concrete panels with architectural detailing and modulation of
the building massing at the entrances with Exterior Finished Insulate Structural
System (EIFSS) (Exhibit L).
E. Other Variances (Staff initiated).
1. Maximum Floor Area Ratio for the Phase II development is 0.323 when the
maximum is OJ (Exhibit M).
2. Minimum side yard parking setback from the right of way (Gateway Court) in the
Phase II development be reduced from 50 feet to zero feet (Exhibit N).
3. Maximum driveway width in the Phase II development be enlarged from a
rnaximum of 32 feet to 250 feet (Exhibit 0).
Findings - V9rianee #1 (Minimum offiee requirement- Phases II. III. and IVI
1. The GB zoning district requires high quality buildings.
.
2. The applicant is proposing an appealing building
3. The applicant has stated that they will attempt to attract tenants which meet the
requirements of the zoning district (City Council meeting of September 30,1996). The
Phase I project received a similar variance. The tenant MSL which was put into the
Phase I building has an office percentage in excess of 25 percent.
4. The applicant has stated that they would not lease to bulk distribution tenants.
Findin!':s-Variance #2 (Minimum Landscape Lot Area - Phase II)
1. The Zoning Ordinance in Section V, K, 5, a, (4), allows for the Landscape Lot Area of
individual lots in a mixed use project to vary from the requirement (35%) as long as the
overall Landscape Lot Area is within the requircment. The Landscape Lot Area of Phase
II is 25.3 percent which is less than 35 percent. However, the overall Landscape Lot Area
of the project is 41 percent which is greater than the minimum of35 percent.
Findin!:s-Variance #3 (Minimum parkin!: setback - 14th Street - Phase Il)
1. The variance allows the applicant to sufficient buildable depth so as to have standardized
bay depths which are required for a successful project.
.
-
.
.
lfijJ1J
2.
The applicant has provided enhanced landscaping in the area of the variance. However,
the landscape materials provided are on the small side. If the landscape materials were
upsized (ie., 2"-3" upsized to 3.5" to 4" and 3.5" to 4" upsized to 4.5" to 5"), then a
balance may be reached between the applicants market needs and the aesthetics of the
project from the road.
Findinl:s- Variance #4 (Side yard parkinl!" - Phases III and IV)
1. The Landscape Lot Area provided are 36 percent and 54 percent for Phases III and IV
respectively.
2. The maneuvering distance of 130 feet from the building to the edge of the parking lot is a
reasonable maneuvering distance.
3. The project from an aesthetic standpoint may be better served if the setback is zero and
the buildings are brought even closer together. Currently the buildings (phases III and
IV) are 280 feet apart, conceivably the buildings could be brought to within 200 feet of
one another and an additional 80 feet of green space could be gained to one side of the
buildings or both sides.
Findinl:s-Variance #5 (Allowable exterior finish -Phases II. III. and IV)
I. The applicant is proposing an appealing building.
2.
The proposed exterior of the building is upgraded from the Phase I building through the
addition of brick on approximately the lower one-third (front and sides) of the building.
3. The west and east elevations of the Phase II building should have the same brick
treatment as the north elevation.
4. The west elevation of the Phase II building should contain some glass.
5. The "finished exterior" of the west and east elevations of the Phase II building shouldbe
wrapped around onto the north elevation up to the first dock doors.
6. The elevations of the Phase III buildings are mislabeled (Exhibit A, page 37 of 47) and
should be labeled as follows:
Phase III building
Currently labeled as To be labeled as
North Elevation West Elevation
West Elevation South Elevation
East Elevation North Elevation
South Elevation East Elevation
~
e
I
/I#/JO
7.
The south (revised) and north (revised) elevations of the Phase III building should have
the same brick treatment as the west (revised) elevation.
.
8. The south (revised) elevation of the Phase III building should contain some glass.
9. The "finished exterior" of the south (revised) and north (revised) elevations of the Phase
III building should be wrapped around onto the east (revised) elevation up to the first
dock doors.
10. The elevations of the Phase IV buildings are mislabeled (Exhibit A, page 43 of 47 and
should be labeled as follows:
Phase IV building
Currently labeled as To be labeled as
South Elevation East Elevation
West Elevation South Elevation
East Elevation North Elevation
North Elevation West Elevation
II.
The south (revised) and north (revised) elevations of the Phase IV building should have
the same brick treatment as the east (revised) elevation.
.
12. The south (revised) elevation of the Phase IV building should contain some glass.
13. The "finished exterior" of the south (revised) and north (revised) elevations of the Phase
IV building should be wrapped around onto the west (revised) elevation up to the first
dock doors.
Findinl;:s - Other Variances #1 (Maximum FAR - Phase In
I. The Zoning Ordinance in Section V, K, 5, a, (4), allows for the FAR of individual lots in
a mixed use project to vary from the requirement (0.3) as long as the overall FAR is
within the requirement. The FAR of the Phase II building is 0.323 which is greater than
0.3. However, the overall FAR of the project is 0.263 which is less than the maximum.
Findin~s-Otber Variances #2 (Minimum narking setback - Gateway Court - Phase II)
1. The parking setback can be met on the site. However, if the setback is met, then loading
docks would have to be eliminated from the westerly one-half of the building which
would effect the feasibility of the project.
2.
The owners of Phase I of the GBD and the applicant desire to have Gateway Court as part
of this project.
.
.
.
.
. .
11j~
3.
The parking spaces (approximately 8) which are located in the parking setback could be
relocated elsewhere on the site to minimize the extent of this variance.
Findings-Other Variances #3 (Maximum drivewav width - Phase In
I. This variance is closely linked with the above-mentioned variance. The maximum
opening allowed for a drive access is 32 feet. The Staff would conclude that there are
ways to minimize the extent of this variance and the applicant should propose a
modification to minimize the variance.
Plat - Gateway Addition
I. Minimum Lot Area. The Zoning Ordinance in Section V, F, 2, states that the minimum
lot area for lots in the GB zoning district shall be at least 5 acres. All lots in this plat are
at least 5 acres in area.
Lots Required Lot Area Provided Lot Area
Lot I 5 acres 7.43 acres
Lot 2 5 acres. 8.92 acres .
Lot 3 5 acres 12.49 acres
2.
Minimum Lot Depth. The Zoning Ordinance in Section V, F, 3, states that the
minimum lot depth in the GB zoning district shall be at least 130 feet. All Lots in this
plat have at least 130 feet of depth.
Lots Required Lot Depth Provided Lot Depth
Lot 1 130 feet 485 feet
Lot 2 130 feet 720 feet
Lot 3 130 feet 750 feet
3. Minimum Lot Width. The Zoning Ordinance in Section V, F, 3, states that the
minimum lot width in the GB zoning district shall be at !cast 100 feet: All Lots in this
plat have at least 100 feet oflot width.
Lot Required Lot Width Provided Lot Width
Lot 1 100 feet 658 feet
Lot 2 100 feet 421 feet
Lot 3 100 feet 700 feet
.
.
.
1'6/70
4.
Easements. The preliminary plat is required to show typical utility and drainage
easements for the lots as required by the Subdivision Ordinance in Section 22-8, (e). The
easements are twelve feet in width centered on the side property lines and at least twelve
feet in width on the front and rear property lines. The plat also provides for the drainage
and utility easements which encompass the ponds and wetlands on the site.
e
The plat should provide an easement across the southeastern side of Lot 3 from the
relocated 14th Street to the Vaughn Towers property to maintain access to this property.
The easement should be twenty feet in width.
The dedication of 14th Street should be continued done to the southernmost lot line of the
plat (southeastern side of Lot 3). Also, the cul-de-sac bulb should be shown as an
easement which could be terminated when the road is extended at some point in the
future, if ever.
5.
Park dedication. The proposed plat provides for no dedication of park land. The
Planning Study for NE l-694/I-35W area does include a trail along Round Lake (Exhibit
P). The Staff has been working with the Parks and Recreation Director and the U.S. Fish
and Wildlife Service to determine the appropriate placement of the trail along Round
Lake. The Parks and Recreation Director will be forwarding to the City Council her
recommendations for the dedication of any land needed to facilitate the trail and the
amount of park dedication fee that is owed, pursuant to the Subdivision Ordinance in
Section 22-9 of the City Code.
.
6. Final Plat. The City Code (Subdivision Ordinance) in Section 22-4, (b), (4), states that;
"If the final plat is approved by the city council, the subdivider shall record it with the
county recorder or rcgistrar of titles within sixty (60) days after the date of approval; or
otherwise, the approval of the final plat shall be considered void ...". Therefore, if the
City Council approves the final plat on Monday, July 14, 1997, then the final plat
would have to be recorded by Friday, September 12, 1997 or the final plat approval
would be void.
Prior to City Council consideration of the final plat all development agreements (ie.,
development, minimum assessment, TIF, etc.,) must be executed by the applicant and the
City of Arden Hills.
Discussion
Due to the length of this report, 1 will keep my discussion topics to the two areas which I believe
are most critical: aesthetics between Phases III and IV; and the timing of this project relative to
the timing of road improvements to serve this project.
I believe that the relative aesthetics of the "I" area (Exhibit Q) between Phases III and IV will
playa significant role in the City's ability to attract a quality office tenant on the "30 Acres" .at
the corner oflnterstate 694 and Interstate 35W. The City should examine and be comfortable
with the grades, ponds, parking areas, landscaping, and exterior elevations of this area.
.
.
-
.
IVJIW
As previously mentioned the Traffic Engineer has stated, in Exhibit A, page 12 of 47, paragraph
4, that "... the project will have no significant impacts on the signalized intersection at County
Highway 96 and Round Lake Road...". However, the intersection of Round Lake Road and
Highway 96 has not yet been relocated nor signalized. Therefore, linkage is required between
the approvals granted in this request and the completion of certain minimum improvements on
Round Lake Road to facilitate those approvals.
Deadline for Al!ency Actions
The City of Arden Hills received the complete application for this request on June 13, 1997.
Pursuant to Minnesota State Statute the City must act on this request by Tuesday, August 12,
1997 (60 days), unless the City provides the petitioner with written reasons for an additional 60
day review period. The additional review period would extend to Friday, October 10,1997. The
City may with the petitioners consent extend the review period beyond the Friday, October 10,
1997 date.
Lastly, if the City denies the petitioners request, "... it must state in the writing the reasons for the
denial at the time that it denies the request."
Options
1. Recommend approval as submitted.
2. Recommend approval with conditions.
3. Recommend denial with reasons for denial.
4. Table for additional information.
Recommendation
The Staff recommends approval of Planning Case 97-06, PUD Master Plan and Final Plan
(including variances as amended by Findings), preliminary and fmal plat, and street vacation,
subject to the following conditions:
1. Provision of an acceptable street name for the relocated 14th Street;
2. Issuance of occupancy permits until such time that the relocated Round Lake Road is
open for traffic and capable of accepting increased traffic;
3. Compliance with the approval of the Rice Creek Watershed District;
4. Approval of and compliance with an NPDES permit by the MPCA;
5. Compliance with the City Engineers letter dated June 24, 1997;
6. The smallest amount of bare ground is exposed for as short as time as feasible;
7. Temporary ground cover, such as mulch, is used and permanent ground cover, such as
sod, is established;
8. Methods to prevent erosion and trap sediments are employed;
9. Fill is stabilized to accepted engineering standards, approved by the city engineer;
10. Approval of and compliance with wetland permits by the U.S. Army Corps of Engineers;
II. Modification of the landscape plan to provide the required landscape material;
12. Provision of style of trash enclosures;
13. Provision of the type and size of the three (3) Area Identification signs;
14. Provision oflow profile rooftop units painted to match the buildings exterior and located
such that they will screened to prevent direct viewing from public right's-of-way;
IS. Compliance with the lighting requirements of the Zoning Ordinance;
16.
. 17.
18.
19.
20.
21.
22.
23.
24.
Notes
1.
2.
3.
.
4.
.
?V/X
Determination by the City Council that an Environmental Impact Statement (EIS) is not
warranted (negative declaration) or an EIS adequacy determination is made; .
Modification of the landscaping as outlined in Findings - Variance #3, item 2;
Modification of the buildings exteriors (Phases II, Ill, and IV) as outlined in Findings _
Variance #5, items 2 through 13;
Modification of the parking spaces to eliminate the variance as outlined in Findings _
Other Variances #2, item 3;
Provision of the necessary drainage and utility easements on the plat;
Provision of the necessary access easements (Vaughn Towers) on the plat;
Extension of the relocated 14th Street to the southeastern most portion ofLot3;
Payment and/or dedication of park land as recommended by the Director of Parks and
Recreation;
Execution of all development agreements prior to consideration of the final plat by the
City Council.
If the Planning Commission makes a recommendation on this Plarming Case, then it
would be heard at the Monday, July 14, 1997 (applicants request) regular meeting of the
City Council.
Pursuant to Section VIII, D, 6, c, of the Zoning Ordinance, "A vote of at least four-fifths
(4/5) of the full council is required for approval of the Master Plan.
Pursuant to Section VIII, F, 2, of the Zoning Ordinance the PUD approval "... shall
automatically expire and become void one (1) year from the and after the date on which
the council granted such approval if the building permit or other approved improvements
have not been issued a permit by the building inspector...".
The City Code (Subdivision Ordinance) in Section 22-4, (b), (4), states that; "If the final
plat is approved by the city council, the subdivider shall record it with the county recorder
or registrar of titles within sixty (60) days after the date of approval; or otherwise, the
approval of the final plat shall be considered void ...".
.
.
..
.
.
E)dt\\bit- 1?
(r~fvrU1cc.. -h> ~e-
1";;/1--0 of -Bxhi\?i-t Pr)
V;:l-
VARIANCE REOUEST
The Zoning Ordinance of the City of Arden Hills, Section V(K)(I) "Procedure," states as
follows:
"The prescribed procedure may be modified by the City to allow
planning flexibility and to encourage cooperative dialogue between the
applicant and the City. "
These requests for modification are being presented to the City of Arden Hills in the context of a
request for a Planned Unit Development (PUD) approval. The City's PUD Ordinance allows for
some design flexibility. The premise for justifYing these variance requests include the unique
character of the land, the nature of it's context within this area of the City and the overall goalsof
the City for development in the Gateway Business Zoning District.
Again, the following specific but modest variances are being requested from the City of Arden
Hills' Gateway Business (OB) Zoning District requirements:
1. Minimum office component requirement within each office/warehouse building reduced
from 25% to 10%.
2. Minimum landscape area requirement for the Phase II development reduced from 35% to
25.3%.
3. Minimum front yard parking setback for the Phase II development reduced from 50 feet to 13
feet.
4. Minimum side yard parking setback for the Phase III and Phase IV building loading
dock/service areas reduced from 20 feet to 10 feet.
~
5. Allowable building finish expanded from stone, brick and glass to also includepre-cast,
insulated concrete panels with architectural detailing and modulation of the building massing
at the entrances with Exterior Finished Insulate Structural System (EFISS).
. (e.~"IoH PI. .{l(orO Ju1L.t'2-,ltt1-l
MINIMUM OFFICE COMPONENT PERCENT AGE .~ 1"lI ~ flot.nt)!~
lA?mj"l"l i s$1 0l"I")
The buildings will be a high profile, high quality office/warehouse building which will service
distribution and light manufacturing companies desiring space with easy access to Interstate 35W
and Interstate 694. Each $5,000,000 (Five million dollar) phase investment in the community of
Arden Hills is based on Welsh's knowledge of the desire for, and need of, such space by many
tenants. This project will be highly successful and will set the stage for further completion of
development in the Gateway District.
HKS ASSOCIATES, INC.
June 13, ] 997
Page 8
GA TEW A Y BUSINESS CENTER
for Welsh Development Company, LLC
~
e
,
?-/~
The typical tenant for the office/warehouse market which is being targeted is likely to have an
office component from 10% to 20%. The desire is to continue the on-going relationship with the
City of Arden Hills with the understanding that tenants of this type do not typically have a 25%
or greater office requirement. Therefore, the variance request to 10% is designed to allow for the
flexibility to meet tenant requirements.
.
The City of Arden Hills shall be assured that there are no plans to be leasing space to bulk
distribution tenants. Based upon the total cost of the project, this development would not be
competitive with other bulk distribution projects, nor is it intended to be. The intent
MINIMUM LANDSCAPE AREA (PHASE II DEVELOPMENT ONLY)
The Code contemplates a 35% green space allocation. We are requesting a modest variance,
based on our site plan for Phase II, to 25.3%. This design will allow for appropriate vehicle
parking, truck access, maneuvering and dock area facilities within the Phase II development site.
Justification for this variance is accommodated through the P.U.D. The overall landscape area
percentage is 41 %.
MINIMUM FRONT YARD PARKING SETBACK (pHASE II ONLY)
In order to create a visually arresting and attractive building design and layout, with reasonably
marketable bay sizes and bay depths, we are also requesting variance from the 50 foot Front Yard
Setback to 14 feet (30 feet in some areas). The average front yard green space, created in the
Phase II development, is greater than the City code's minimum of 50 feet. This variance will
accommodate an efficient parking area design which maximizes the landscape area created on
this property.
e
MINIMUM SIDE YARD PARKING SETBACK (pHASE III AND IV)
Due to the truck apron length, we are also requesting a variance for the Side Yard Setback from
the suggested 20 feet to 10 feet. This green space is more effectively utilized in other portions of
these two phases. The green area percentage for Phases II and III are 36% and 54%,
respectively.
When reviewing the site plan as a whole, and particularly when considering it in the context of
the use and layout of the undeveloped areas in this portion of the Park, each of these modest
variances make great design sense. Furthermore, these modifications insure compliance with the
City's request to keep truck areas interior facing and obscured from freeway visibility,
.
HKS ASSOCIATES, INC.
June 13, 1997
GA TEW A Y BUSINESS CENTER
for Welsh Development Company, LLC
Page 9
b .
~)(hi ~i + C
Yi
JUf.,,<{ Iq-~ I'H1- memo +0 -fM ~~
.
Planninl! Commission recommendation
The Planning Commission recommends approval of the PUD Master Plan and Final Plans
(including variances) and preliminary plat in Planning Case 97-06, subject to the following
condluons:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
. 15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
Notes
1.
.
Provision of the street name for the relocated 14th Street as Gateway Boulevard.
No issuance of occupancy permits until such time that the relocated Round Lake Road is
open for traffic and capable of accepting increased traffic.
Compliance with the approval ofthe Rice Creek Watershed District.
Approval of and compliance with an NPDES permit by the MPCA.
Compliance with the City Engineer's letter dated June 24, 1997.
The smallest amount of bare ground is exposed for as short a time as feasible.
Temporary ground cover, such as mulch, is used and permanent ground cover, such as
sod, is established.
Methods to prevent erosion and trap sediments are employed. .
Fill is stabilized to accepted engineering standards, approved by the City Engineer.
Approval of and compliance with wetland permits by the U.S. Army Corps of Engineers.
Modification of the landscape plan to provide the required landscape material.
Provision of style of trash enclosures.
Provision of the type and size of the three (3) area identification signs.
Provision oflow profile rooftop units painted to match the building's exterior and located
such that they will be screened to prevent direct viewing from the public's right-of-way.
Compliance with the lighting requirements of the Zoning Ordinance.
Determination by the City Council that an Environmental Impact Statement is not .
warranted (negative declaration) or EIS adequacy determination is made.
Modification of the landscaping as outlined in Findings - Variance #3, item 2.
Modification of the building's exteriors (Phase II, III, and IV) as outlined in Findings -
Variance #5, items 2-13.
Modification of the parking spaces to eliminate the variance as outlined in Findings -
Other Variances, item 3.
Provision of the necessary drainage and utility easements on the plat.
Provision of the necessary access easements (Vaughn Towers) on the plat.
Extension of the relocated 14th Street to the southeastern-most portion of Lot 3.
Payment and/or dedication of park land as recommended by the Parks and Recreation
Director.
Execution of all development agreements prior to consideration of the final plat by the
City Council.
Provision of revised design with more 3-D relief for the entrances and sides of Phase II
building to the City Council.
Approval by the Fire Chief of all building address locations.
Pursuant to Section VIII, D, 6, c, of the Zoning Ordinance, "A vote of at least four-fifths
(4/5) of the full council is required for approval of the Master Plan".
18.
. 19.
20.
21.
22.
23.
24.
25.
26.
.
.
,
t;.yh~ b i-t b
k:
:3
Modification of the building's exteriors (Phase 11, III, and IV) as outlined in Findings-
Variance #5, items 2-13.
Modification of the parking spaces to eliminate the variance as outlined in Findings _
Other Variances, item 3.
Provision of the necessary drainage and utility easements on the plat.
Provision of the necessary access easements (Vaughn Towers) on the plat.
Extension of the relocated 14th Street to the southeastern-most portion of Lot 3.
Payment and/or dedication of park land as recommended by the Parks and Recreation
Director.
Execution of all development agreements prior to consideration of the final plat by the
City Council.
Provision of revised design with more 3-D relief for the entrances and sides of Phase II
building to the City Council.
Approval by the Fire Chief of all building address locations.
t
.
The City Council on July 14, 1997, approved the PUD Master Plan. including Landscape Plan
and Variances, and Preliminary Plat in Planning Case 97-06, subject to the following conditions:
1. Provision of the street name for the relocated 14th Street as Gateway Boulevard.
STATUS - (Condition Satisfied). The plans provide for the new street names.
2. No issuance of occupancy permits until such time that the relocated Round Lake Road is
open for traffic and capable of accepting increased traffic.
STATUS - (pending). The applicant's traffic engineer has reviewed this condition and is
requesting a modification of this condition. The discussion on this modification can be found in
the Update section of this memorandum item number one.
3. Compliance with the approval of the Rice Creek Watershed District.
STATUS - (pending). This condition is reviewed for compliance during construction.
4. Approval of and compliance with an NPDES permit by the MPCA.
STATUS - (pending). This condition is reviewed for compliance during construction.
5. Compliance with the City Engineer's letter dated June 24,1997.
STATUS - (Pending). The grading plan has been modified in an attempt to minimize the
exportation of material from the site. Therefore, the engineers letter is dated and he will be
providing a revised letter at the meeting.
6. The smallest amount of bare ground is exposed for as short a time as feasible.
STATUS - (pending). This condition is reviewed for compliance during construction.
7. Temporary ground cover, such as mulch, is used and permanent ground cover, such as
sod, is established.
STATUS - (pending). This condition is reviewed for compliance during construction.
8. Methods to prevent erosion and trap sediments are employed.
STATUS - (pending). This condition is reviewed for compliance during construction.
9. Fill is stabilized to accepted engineering standards, approved by the City Engineer.
STATUS - (pending). This condition is reviewed for compliance during construction.
10. Approval of and compliance with wetland permits by the U.S. Army Corps of Engineers.
STATUS - (pending). This condition is reviewed for compliance during construction.
Stpte-w\~ '),'].., Iqq-:r
~o to ~ &.--h-t ~I
-~-'._-._-'"""",,'._-"--'-- -"--,~,-'-'---"- -.,'-
,':'-"i;;;~:,
.11. Modification of the landscape plan to provide the required landscape material.
STATUS - (Pending). The revisions to the building locations and grading require additional
modifications to the landscape plan. The detailed discussion ofthis occurs in the Updates
section of this memorandum under item number ten.
12. Provision of style of trash enclosures.
STATUS _ (Condition Satisfied). The applicant previously provided details of the style of trash
enclosure that is being proposed (Exhibit B).
13. Provision of the type and size of the three (3) area identification signs.
STATUS - (Condition Satisfied). The applicant previously provided details of the style of trash
enclosure that is being proposed (Exhibit C).
14. Provision of low profile rooftop units painted to match the building's exterior and located
such that they will be screened to prevent direct viewing from the public's right-of-way.
STATUS - (Pending). This condition is reviewed for compliance during constructiO'n.
15. Compliance with the lighting requirements of the Zoning Ordinance.
STATUS - (pending). This condition is reviewed for compliance during construction.
16. Determination by the City Council that an Environmental Impact Statement is not
warranted (negative declaration) or EIS adequacy determination is made.
STATUS - (Condition Satisfied). The City Council approved a negative declaration on the
need for an EIS with this project.
17. Modification of the landscaping as outlined in Findings - Variance #3, item 2.
STATUS - (Condition Satisfied). The applicant has upgraded the size of the landscape material
. provided along Gateway Boulevard (southwest corner of Phase II) in the area of the parking
setback variance as requested by the Staff.
18. Modification of the building's exteriors (Phase II, III, and IV) as outlined in Findings -
Variance #5, items 2-13.
STATUS - (pending). The satisfaction of this condition is dependent on the City Councils
acceptance of the proposed modifications to the exterior of the building which is discussed in the
Updates section of this memorandum under item nine.
19. Modification of the parking spaces to eliminate the variance as outlined in Findings -
Other Variances, item 3.
STATUS _ (Condition Satisfied). The parking spaces on the northeast corner of Phase II which
required a variance have been eliminated from that part of the plan.
20. Provision ofthe necessary drainage and utility easements on the plat.
STATUS - (pending). The satisfaction of this condition is discussed in the Updates section of
this memorandum under item number four.
21. Provision of the necessary access easements (Vaughan Towers) on the plat.
STATUS _ (Condition Satisfied). The plat shows the required access to the Vaughan property.
22. Extension of the relocated 14th Street to the southeastern-most portion of Lot 3.
STATUS - (Condition Satisfied). The plat shows the required street extension.
23. Payment and/or dedication of park land as recommended by the Parks and Recreation
Director.
STATUS _ (pending). The recommendation of the Director of Parks and Recreation as to park
e dedication is attached to this memorandum (Exhibit D).
'.J../!? -
.~
-"
.-l
.
.
u '
~
....
.
.
.
~/-;;
24. Execution of all development agreements prior to consideration of the final plat by the
City Council.
STATUS - (pending). The development agreement is being reviewed by the City Council at
this meeting
25. Provision of revised design with mote 3-D relieffor the entrances and sides of Phase II
building to the City Council.
STATUS - (pending). The satisfaction of this condition is dependent on the City Councils
acceptance of the proposed modifications to the exterior of the building which is discussed in the
Updates section of this memorandum under item nine.
26. Approval by the Fire Chief of all building address locations.
STATUS - (pending). The applicant has attempted on several occasions to engage the services
of the LNFD as to their requirements in this and other areas without success.
27. The modifications for relief to corners visible from Fourteenth Street would be
researched.
STATUS - (Pending). The satisfaction of this condition is dependent on the City Councils
acceptance of the proposed modifications to the exterior of the building which is discussed in the
Updates section of this memorandum under item nine.
28. The review of corner relief to be undertaken by the City Council at the time of the fmal
plat submittal.
STATUS - (pending). The satisfaction of this condition is dependent on the City Councils
acceptance of the proposed modifications to the exterior of the building which is discussed in the
Updates section of this memorandum under item nine.
Updates
1. Applicant's Traffic Engineer modification to Condition #2. The applicant requested
that their traffic engineer review the capacity of the existing intersection of Highway 96
and West Round Lake Road to determine the maximum amount of development that
could be accommodated under the existing condition (Exhibit E). In short, the
applicant's traffic engineer concludes that up to 200,000 square feet of additional
development can be accommodated under the existing condition, before the upgrade
intersection is required. Also, the applicant's traffic engineer concluded that the
upgrading of West Round Lake Road from a two lane facility to a four lane divided
facility is not required as a part of this project. Therefore, it would appear to be
appropriate to modify this condition to state; "No issuance of occupancy permits for that
part of the project (phases II, III, and IV) greater than 200,000 square feet until such time
that the relocated Round Lake Road is open for traffic and capable of accepting increased
traffic."
2. Road (Gateway Boulevard) is shifted six feet to the north (plan Sheet C4.0). The'
applicant in an effort to minimize the extent to which they export soil from this project is
proposing to increase the relative elevation of the site approximately two feet. In doing
this relative increase in site height the street height also had to increase to keep grades
stable. The railroad right-of-way to the south of Gateway Boulevard was a limiting factor
in the grading scheme. The road bed of Gateway boulevard needed to be shifted six (6)
feet to the north within the right-of-way to accommodate the increased height of the road.
Even with the shift, the City will still need a slope easement from the railroad company.
.
. ~n!\~1 \~);'
\ L....J-...I
! 0...
i w
" I-
/ ~
I
/
/
/
.
...;!'~
,.
J.>
..~
'.
~~
~!
.".
~~
/-._._-~
\
./
\ j
<
!
i
~
/.
'.'
" .~'<-
(,.
1..< .
d 'o:
Ii ',L
, .
'\\_;;-'
.'.;C---
../ ----"
.";:'rrrmmrrmm1..
,.,,/~- l~ ~ ITS
{$-./' .--- :3 "
.....< .\,#,: 'i r III I I
.c i,~ ;:1,
'i -
\1 'I ---L...L_l.
' t: (0 "_ ! I i
J' ~ i. O! I - '1-;-1:-1:=:
. i" ! i - !-'-l
'.1 ('r f ] =-+j~E
: ~ I III I -- -- ~- jl>~!=:
' g >f. -- ! ;::
. <= - II -'--'-!--'1;-
r- _._., I I
! ! (l'"- ---(.,'.1"-
; . 1- ...i .J.__.i.-.
: ~ ; -. =~=.~-_.t.-
: to , ....LL.L
~ ~l I 1 !
,i= ==!,j ,
: g ~I
~ .:. ll' ~r=l~_J
. ;--.
-- ,,/ .iN
J~~1?J*'7~
.....,.--
"
r
I
....-.-'.
l.r'....
, \
J .
I '.
,
~
.,
'~
)\.~--
~ \ ....
I \ -""-,
" ,
.-.~. J I' /
--- '< 1/ ....
'"' ~ ."
1..........:::...",......../..
./
.'
f
/f
.,/
/
.'
,
\
.,
,
,/1
.'"
/
/.'/
./
" Ii
,
,
....---
-."'~
l~!ff" ~~../I~JPIUP,.,
.
9ffi;.- 'PU'rN CF ^l-L- ~~~
(:fi~'( 'O~
170* C1-:::r .0&
'}""it
!
Li
-'
-'
c5
"
'Z
III
IE
C>
....l ~ ~
III ,I
~ i
i~!hl
!~Il11
JiS ~
~ ~
>
...
.0
-i~ ~
~oo u
l" ~g~1
'l'<t~
ili~n
hm~
lIrii'
n!ili
.,.i.-
~!!..~
, ,
, ,
: ~------------------------
I-::::-=---::=Iilf-::::---~-~~----~~-;J- ----------.
"r------------- -----------1-------l- ~---_L___
------
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
, '
J~i
,
,
.
.
,
,
I
,-
. /J--:~
II
i
:} I
j
j
j
_.----~
...
(61f:j1- Gr,l'(ft31.lJfW BLW'
pc -:#' qq ~J-? CAw\~)
'( v '-, .II/&... /
m -~
._~
E;)O H1 f'I1'
f VI
~
Is
I-
.
Is
z
<:(
..J
U 0...
,
, Wi
I !I~ : i 1--
j- I <l)
, i\ ) , /
, I - ,
i ,;1/ /
- I iiI- ,
/
i
(
I~
~,
~. I
:4
I
i
i
i
i
!
i ,
,
,
I ,
,
,
,- I I
, ,
!. , , ,
,
, I I
,
i , ,
, , )
, ,
, ,
!
I I
i !
i
i
; i
i I
I
,
I I ,
J' :: :
! I' .
.1 ~i-~-~----T~-----~----------------------
, I I I -I I . d... ."' .... .. ---~~.-;:
I : 1 ~ : :
I I I: ~: c-------------n--------n------1--
I I.! &~ Ln___________________________________
i ': 5i~ I
I:' .
L_______~__________________________~------ --
- --
I
,
I
,
,
. ,ff
: ' I
, ' ,
, ' '
, , ' ~
___.~_L_____ !
"I I" 'I
, , , I
__J : : I
' ,
__J I
,
!l : '
9~ ~
_________J
i I
! t I
j
i I
I
I
<
.j
I
i
i
i
i
r
i
i
i
I
I
I
i
i
I
--
-
1 --
-1~..=.u......"'
, ,
, I
~ 1 ~ ~.
_______________________________J_ _~5.__.__;~..'
-------
---------------------~--------------------
"~__.'__.......___H.~.'~"~~_
.
~
.
FINAL RECOMMENDATIONS
OF THE
INGERSON PAVEMENT PROJECT REVIEW GROUP
August 17, 2000
.
Linda Swanson, Resident and Chairperson
Steve Baker, Member ofthe Arden Hills' Planning Committee
Teresa Cain, Resident Representative
Dick Hanson, Resident
Terry Nygaard, Member of the Arden Hills' Operations and Finance Committee
Christine Peterson, Resident
Yvonne Wilken, Resident
.
TABLE OF CONTENTS
EXECUTIVE SUMMARY ............................................................................... ........ ...................................... 3
GENERAL STREET DESIGN ....................................................................................................................... 7
STREET CLASSIFICATION SYSTEM ......................................................................................................1 0
STREET WIDTHS............................................................................... .................................... ..................... 11
STORMW ATER MANAGEMENT .............................................................................................................16
Alternative Methods/Rain Gardens ........ .................................. ......................... ....................................... 18
Acceptance of Rain Gardens by Ingerson Project Residents.....................................................................20
Financial Resources for Alternative Methods .................................... ................. ......................................21
Curbs and Gutters...................................................................................................................................... 22
Water Holding Ponds................................................................................................................................ 23
Closure of Hamline ........................ ........... .............................. ............................................ .............. ........25
STREET STRUCTURE ................................................................................................................................27
LAKE JOSEPHINE .................................................................................................................... ..................28
NEIGHBORHOOD/RESIDENT INVOLVEMENT .................................................................................... 29
CONCLUSION .......................................................................................... ........................................... ........30
APPENDIX A - BACKGROUND ............................................................ .................................. ..................32
APPENDIX B - REFERENCED ARTICLES.................. .... ... ......................................................................35
2
August 17. 2000
~
.
.
.
;
.
INGERSON PROJECT RE VIEW GROUP RECOMMENDATIONS
EXECUTIVE SUMMARY
The following summarizes the recommendations ofthe Ingerson Project Review Group
("Review Group"). Information relevant to the recommendations and background information
follow the Executive Summary:
. Should the Ingerson Project roadways! be included in the pavement program?
The majority of the Review Group members do not believe or recommend that the Ingerson
Project should proceed unless major modifications are made to the original BRW feasibility
report, alternative methods are devcloped and designed and the necds and desires of the residents
are incorporated into the final proposal. Some Ingerson Project residcnts feel that the
implementation of the original BRW feasibility report would be destructivc to the acsthetic
quality of the neighborhood. If the Council believes the original BRW feasibility proposal
should be incorporatcd, it is the Review Group's recommendation that the residents be allowed
to reject the project in its cntirety.
In years past, Pavemcnt Managcment Programs (PMP) dealt only with roadway projects. The
amount ofimpcrvious surface drastically affects water quality. In today's society and
environment, any PMP currently adopted should not only serve thc needs of the City and the
residents but must incorporate good sound water quality standards.
. . If the Ingerson roadways are included in the pavement program:
. General Street Design Comments
The Review Group members agree and acknowlcdge that thc City has a responsibility to
maintain existing roadways. The Review Group recognizes that it is the desire of the City and
Council to deal with entire "neighborhoods" as opposed to only certain streets within a
neighborhood in thc various PMP projects. Howcver, each roadway within a PMP should be
rcviewed and the PMP proposal should not merely incorporate rigid standards for every roadway
within the project. Thc rcvicw should include, but not be limited to, the purpose of the
roadways; the amount of traffic on the roadways; thc current condition of each roadway within
the projcct; the needs of the City; thc needs and desires of the affectcd community/neighborhood;
the end effect of the project on the neighborhood; the value of any projcct to the neighborhood;
the end effcct of the project on any watcr quality issues; etc.
For example, both Fcrnwood Court and Ingerson Court only provide access to two (2) homes
each whereas the remaining roadways within the Ingerson Project provide multiple vehicle
access. Femwood Court was repaved in the 90s and is in excellent shape. However, Ingerson
Court has not been repaved lately and is not in good shape. The Review Group does not believe
that Fcrnwood Court should be included within the Ingerson Project and/or held to the same
standards and dcsigns as Ingerson Court. In other words, each roadway within a PMP projcct
should be reviewcd to determine how it "fits" within the project.
.
1 The roadways included in the Ingerson Project include Ingerson Road, Ingerson Court, Fernwood Road, Fernwood
Court, Hamline A venue, Cannon A venue, Tiller Lane, and Carlton Drive.
3
August 17. 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
.
. Street Widths
It is the recommendation ofthe majority of Review Group members that the current widths of
the project roadways be maintained.2,]
. Alternative Methods
All Review Group members recommend that feasible cost effective and efficient alternative
methods such as rain gardens be reviewed and analyzed for the Ingerson Project as a possible
means of avoiding the installation of a storm sewer piping system.
. Curbs and Gutters
All Review Group members recommend that the Ingerson Project not include the installation of
6", or more, concrete curbs and gutters.
The majority of neighborhood residents that responded to the Dec. 1999 neighborhood survey
indicated that they are opposed to the installation of any curb and gutter system. From a water
quality standpoint, installation of curbs and gutters may be detrimental. To maintain the integrity
of the roadway without increasing the road width flat concrete edge bands could be installed.
Surmountable curbs could or should be installed in areas that require control of water drainage.
. Water Holding Ponds In the Area Between Hamline Ave. and Snelling Ave.
Four (4) members of the Review Group believe that by incorporating alternative methods to e
addrcss stormwater runoff, the holding ponds in the area between Hamline Ave. and Snelling
Ave. are unnecessary. Three (3) members ofthe Review Group believe that the project should
incorporate the installation of a holding pond in this area.
Before any final decision about holding ponds is made, the City and Engineering staff should
obtain additional information regarding the area, including whether it currently meets the needs
from a water quality standpoint and information regarding the anticipated water quantity for this
area.
. Closnre of Hamline Avenne
The Review Group is split on whether Hamline Ave. should be permanently closed. If, however,
Hamline Ave. north ofIngerson Road is not reconstructed and is closed, all Review Group
members recommend the area be landscaped appropriately to maintain the natural setting ofthe
area.
A concern the Review Group has about the closure of Hamline Ave. is the detrimental effect it
may have on the traffic speed in this area. Based upon current knowledge of the traffic speed in
this area (fast speed around the Hamline/Ingerson intersection), some Review Group members
believe traffic speed may increase in this intersection if the stop signs are removed and/or if the
2 One member felt that the roads should only be increased to obtain unifonnity with the rest of that road. In other .-
words, if a portion of the road was e.g. 24' and another portion of the same road was e,g. 26'; the entire road should .-
be increased to e.g. 26'.
] One Review Group member felt that Hamline Ave. should be rebuilt to MSA standards and the remaining streets
sbould be increase to 30'.
4
August 17, 2000
.
.
.
INGERSON PROJECT REVIEW GROUP RECOMMENDA nONS
area is designed without taking into account area traffic speed. By landscaping appropriately,
residents will utilize this area for recreational benefit. It is the recommendation of the Review
Group that this area not only be landscaped appropriately but that design considerations be given
in regards to the potential effect on traffic speed and residents' safety.
. Street Structure
Thc original BR W feasibility report suggested that all roadways within the Ingerson Project be
reconstructed down to the subbase. The Review Group members recognize and acknowledge
that the City must maintain the life of a roadway. The majority of Review Group members
recommend that the current subbase structure of each roadway be reviewed individuallv, taking
into account the roadway usage, to determine if it is necessary to reconstruct the subbase for that
particular road. If a subbase does not need to be reconstructed, the road should merely undergo a
2"- 6" cold recycle overlay, provided that the end product is a road with a consistent life
expectancy throughout, which is commensurate with reconstructed roads of the same type.
. Lake Josephine Stream
The original BR W feasibility report proposed to reconstruct the stream that runs into Lake
Josephine by Fernwood Court and Ingerson Road. A resident and/or the Lake Josephine
Association (comprised of residents along Fernwood Court and Ingerson Road) privately own
this land.
The Review Group acknowledges that water quality standards must be addressed. By
incorporating altemative methods for stormwater runoff in the Ingerson Project, the City can
significantly decrease the amount of water flowage into the Lake Josephine stream offIngerson
Road. Before any design proposal is undertaken for this area, the City and Council should obtain
further information about whether or not the area/stream currently meets the needs of the City
and water quality standards and the water quantity anticipated. The Review Group
acknowledges that the Council has received recommendations submitted by the Lake Josephine
Association.
This land provides not only recreational value but also homeowner market value to the owners.
For these reasons, as well as the reasons cited below, the Ingerson Project residents as well as the
Review Group members are opposed to the taking of any of this land. If, however, any changes
are made to this private property (e.g. increase stream width by approximately 6"), the City
should provide tangible and/or monetary consideration to the owners of any land impacted by the
change.
. Neighborhood/resident involvement
Although the Review Group was not charged to make recommendations about future PMP
projects, the Review Group does recommend that the process be modified to allow residents an
5
August 17, 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
earlier opportunity to have input into each project. Specifically, the Review Group suggests the
following process:
1. City staff prepare and publish a map of anticipated projects scheduled over the
next five years;
2. City staff present conceptual designs to thc affected residents of a project one (I)
year in advance of the final feasibility report;
3. City staff provide a process and adequate time for residents' input by holding
meetings with affected residents to explain details of the proposed project design
once preliminary survey and design work has been completed; and
4. City staff consider residents' comments on the proposed design in developing the
final feasibility report to the Council.
6
August 17. 2000
.
.
.
e
e
e
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
GENERAL STREET DESIGN
Review Group Recommendations:
The Review Group memhers agree and acknowledge that the City has a responsibility to
maintain existing roadways. The Review Group recognizes that it is the desire of the City
and Council to deal with entire "neighborhoods" as opposed to only certain streets within a
neighborhood in the various PMP projects. However, each roadway within a PMP should
be reviewed and the PMP proposal should not merely incorporate rigid standards for every
roadway within the project. The review should include, but not be limited to, the purpose
of the roadways; the amount of traffic on the roadways; the current condition of each
roadway within the project; the needs of the City; the needs and desires of the affected
community/neighborhood; the end effect of tbe project on the neighborhood; the value of
any project to the neighborhood; the end effect of the project on any water quality issues;
etc.
For example, both Fernwood Conrt and Ingerson Court only provide access to two (2)
homes each whereas the remaining roadways within the Ingerson Project provide multiple
vehicle access. Fernwood Court was repaved in the 90s and is in excellent shape. However,
Ingerson Court has not been repaved lately and is not in good shape. The Review Group
does not believe that Fernwood Court should be included within the Ingerson Project
and/or held to the same standards and designs as Ingerson Court. In other words, each
roadway within a PMP project must be reviewed to determine how it "fits" within the
project.
The Review Group recognizes and acknowledges that eventually all roadways within a City must
undergo some type of maintenance. However, there is a major distinction between roadway
improvement and neighborhood redesign. It is the belief of some Review Group members that
the original feasibility report prepared by BRW is too intrusive, broad and invasive. As stated by
the American Society of Civil Engineers, National Association of Home Builders and The Urban
Land Institute:
Residential strcets should provide not only safe, efficient circulation for vehicles and
pedestrians but should create positive aesthetic qualities for the users. The "character" of
a residential street is influenced to a great extent by the paving width, horizontal and
vertical alignments, and the landscape treatment of the street edges. Residential streets
are community spaces that should convey an image and scale appropriate to the
neighborhood.4.5
4 Residential Streets, Second Edition, 1990, American Society of Civil Engineers, National
Association of Home Builders, The Urban land Institute.
5 References to published articles herein are based upon research conducted principally by Linda
Swanson, Chairperson. The Review Group as a whole did not undertake exhaustive research of
available authorities. Copies of articles cited are not attached to this report. If the Council
desires copies of all or any ofthe cited articles they should contact Linda Swanson.
7
August 17, 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
.
Although residents expect good and safe streets, they also desire aesthetically pleasing
neighborhoods.6 The American Society of Civil Engineers, National Association of Home
Builders and The Urban Land Institute further state that:
The design of a residential street should be appropriate to its functions. A residential
street's functions include not only its place in the transportation system but its role as part
of a residential community's living environment.... [And] [t]he design of a residential
street should be appropriate to its functions. A residential street's functions include not
only its place in the transportation system but its role as part of a residential community's
living environment.7
According to the Recommended Guidelines for Subdivision Streets, 1984, Institute of
Transportation Engineers (ITE), four (4) factors - safety, efficiency of service, livability, and
economy - should guide the design of residential streets. The two most notable factors are:
. First, local streets should be designed to discourage excessive speeds; and
. Second, minimum area should be devoted to streets.8
The Institute of Transportation Engineers believes that the "design oflocal street systems must
recognize the following factors";
. Safety for both vehicular and pedestrian traffic;
. Efficiency of service for all users;
. Livability ofthe residential environment;
. Economy ofland use, construction, and maintenance.9
.
Guidelines for street design include:
. Street planning should relate to overall community plarming.
. Traffic in residential areas should be kept to a minimum to reduce noise, congestion,
and hazards to pedestrians.
. The street is an important component of overall residential community design.
Properly scaled and designed streets can create more attractive communities and
contribute to a clearly defined sense of place.
. Street design standards should permit flexibility in community design. They should
allow street aligrunents to follow natural contours and preserve natural features or to
respond to other design objectives such as the creation of more intimate urban-or
village-scaled streetscapes.
. Wherever possible, street layouts should be plarmed to avoid excessive storm water
runoff and the need for storm sewers.
6 Residential Streets, supra
71d..
81d.
, Id.
.
8
August 17. 2000
e
e
e
INGERSON PROJECT REVIEW GROUP RECOMMENDA TJONS
. The amount of paved area should be kept to a minimum to reduce construction and
maintenance costs, stomlwater runoff, and heat buildup.
. In the interest of keeping housing affordable, street costs should be minimized.
. Overdesign of streets should be avoided. Excessive widths or an undue concern with
geometry more appropriate for highways encourages greater vehicle speeds.
. Different streets have different functions and need to be designed accordingly.
Blanket standards are inappropriate. 10
The Institute of Transportation Engineers have also provided recommend guidelines for streets:
. Street system design should discourage through traffic on local residential streets.
. To discourage excessive speeds, streets should.. .not be designed to be wider than is
necessary.
. Local streets should be responsive to topography and other natural features from the
standpoint of both economics and amenity.
. The residential street should enhance the community's visual imageY
As stated above, we recognize that the City of Arden Hills' rcsponsibility to its residents include
street maintenance. However, the Review Group members believe it is imperative that the City
also be flexible in its proposed projects so that the end project not only meets the needs (e.g. road
pavement, water quality, etc.) ofthe City but also the needs and desires of the affected
community.
Surrounding cities such as Golden Valley and Maplewood have also designed and developed
PMPs. These cities recognize that although PMP programs are essential to the continuous
growth and maintenance of the community, it is also imperative to meet the needs of the
residents that are served by the PMPs. For any PMP project, both the City of Golden Valley and
Maplewood attempt to maintain the existing neighborhood design.12
Water quality standards propounded by Federal and State EPA and local Watershed Districts
continue to improve and be more extensive and stringent. Incorporating the current standards
and recommendation in the Ingerson Project will avoid future expensive retrofit costs.
Federal Emergency Management Agency (FEMA) officials state:
[T]hat areas previously at low risk [to flood waters] may not remain so because
development changes the watershed, making unwanted water appear in new places.
10 Id.
"Id.
12 Ken Haider, Public Works Director, City of Maplewood, May 2, 2000 Review Group Meeting;
City of Golden Valley PMP, http://www.ci.golden-valley.mn.us/streets/pmp.htrn.
9
August 17. 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
.
Dcvelopment tends to alter the flow of runoff during heavy rains. When you have citics
that are growing quickly, the runoff patterns can be altered very easily by things like
parking lots, driveways, sidewalks, streets and landscaping.13
As stated by numerous Arden Hills' residents at the January 10, 2000 Council meeting, one of
the reasons why the residents moved to the Ingerson neighborhood was because of its aesthetic
beauty. It is the recommendation of a majority of the Review Group members that the Ingerson
Project not disturb the current design and makeup of the Ingerson neighborhood.
STREET CLASSIFICATION SYSTEM
In order to determine the types of improvements and the type of standards that should be
imposed and incorporated into a street, including the streets within the Ingerson Project, one
needs to determine how streets are classified.14 The American Society of Civil Engineers,
National Association of Home Builders and The Urban Land Institute provide the following
street classification system: 15
Arterial. An arterial is a high-volume street that should have no residences on it. Its function is
to conduct traffic between communities and activity centers and to connect communities to
major state and interstate highways. (e.g. Snelling Avenue)
Collector. As the principal traffic artery within residential or commercial areas, the collector .
carries relatively high traffic volumes and conveys traffic from arterial streets to lower-order
streets. Its function is to promote the free flow of traffic; as such, communities should not
encourage parking or residences along a collector. The collector's secondary function is to serve
abutting land uses. A collector street may also accommodate public transit such as buses. (e.g.
Lexington and "main" Hamline [not residential Hamline])_
Suhcollector. The sub collector provides passage to access streets and conveys traffic to
collectors. Like the access street, the subcollector provides frontage and access to residential lots
but also carries some through traffic to lower-order (access) streets. The subcollector is a
relatively low-volume street. (e.g. residential Hamline, Ingerson Road, Tiller Lane)
Access Street. Thc access street is designed to conduct traffic between dwelling units and
higher-order streets. As the lowest-order streets in the hierarchy, the access street usually carnes
no through traffic and includes short streets, cul-de-sacs, and courts. (e.g. Carmon., Carlton
Ave., Dunlap Ave., Femwood Ave., Femwood Ct., Ingerson Ct.)
\J Flood Insurance, STAR, July 29,2000.
14 Residential Streets, supra.
15 The MN Local Road Research Board recommends that streets no longer be referred to as local,
collector or arterial but rather living, mixed or traffic purpose streets. Such designations classify
streets according to their intended purposes which then "dictates the most appropriate traffic
calming devices to implement." Effective Traffic Ca1m ine Apvlications and Imvlementation,
MN Local Road Research Board, October 1998.
.
10
August 17. 2000
.
.
.
INGERSON PROJECT REVIEW GROUP RECOMMENDA TlONS
Street Classes Based upon Average Daily Traffic (ADT) Volume:
Access Street 0-250 cars
Subcollector 250-1,000 cars
Collector 1,000-3,000 cars16
Accepting the above classification, the streets within the Ingerson Project would be classified as
17
subcollectors or access streets.
STREET WIDTHS
Review GrouD Recommendations:
It is the recommendation ofthe majority of Review Group members that the current
widths of the project roadways be maintained.
The initial BRW feasibility report for the Ingerson Project proposed the widening ofthe current
street widths of approximately 24' - 28' to approximately 32'. The majority of Review Group
members are opposed to the widening of any streets within the Ingerson Project from their
existing widths.
From the standpoint of safety, traffic, water quality and stormwater management, numerous
articles have been written regarding the width of a neighborhood street. From a safety and traffic
management aspect, the American Society of Civil Engineers, National Association of Home
Builders and the Urban Land Institute have made the following observations and comments:
The width of a street should be based upon both the volume and type of expected traffic
and the amount of on-street parking that will be generated as well as upon the place of the
street in the street hierarchy (access street, subcollector, collector).
Designers should select the minimum width that will reasonably satisfy all realistic needs,
thereby minimizing construction and average annual maintenance costs. The tendency of
many communities to equate wider streets with better streets and to design traffic and
parking lanes as though the street were a "micro freeway" is a highly questionable
practice.
To discourage excessive speeds, streets should.. .not be designed to be wider than is
necessary... [because ] [wider lanes] tend to encourage higher-speed driving. A wide
access street also lacks the more intimate scale that otherwise makes it an attractive
setting for housing.
16 Residential Streets, supra.
17 An average daily traffic volume and traffic speed study was conducted by the Ramsey County
Sheriffs Department on behalf of the City of Arden Hills on Ingerson Road on August 30,1999.
The results ofthe study indicated that the ADT for Ingerson Road was 559 vehicles.
11
August 17. 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
.
On subcollectors, a 26 foot-wide pavement provides either two parking lanes and a
moving or traffic lane or one parking lane and two moving lanes.
A Federal Highway Administration study found that narrow street widths tend to reduce the
speed at which drivers travel. The Institute of Transportation Engineers as well as The Urban
Land Institute have also noted this study. IS
The Center for Watershed Protection also believes that from a safety aspect, residential street
width should be reduced:
[WJide residential streets are designed to promote relatively rapid traffic flow, at an
average speed limit of 30 mph on level or rolling terrain. The wider streets and better
sight distances, however, encourage many drivers to exceed even this relatively high
speed. High speeds, however, are not desirable in residential neighborhoods. One way to
force drivers to slow down is to reduce street width. 19
In its traffic calming guidelines, the Public Technology, Inc. offers the following insights:
One myth is that straighter, wider streets are safer. In fact, they encourage higher speeds.
Narrower streets, in contrast, calm traffic. Vehicle speeds decline. Drivers behave less .
aggressively and are more likely to obey traffic signs and signals. Pedestrians are more
comfortable.
Traffic calming is used most often in residential areas to try to reduce speeding and 'cut-
through traffic' that uses the neighborhood as a short-cut or a by-pass from clogged major
roads.
Traffic-calming design changes are self-enforcing, prompting motorists to instinctively
slow or requiring them to take other routes.
Americans engineer their roads to accommodate a fast speed, and then spend countless
millions of dollars trying to enforce a lower speed limit.
[Motorists J speed because the road allows them to speed.2o
In addition to safety and traffic concerns, it is readily recognized that significant construction
costs savings can be achieved by building narrower streets.21
18 Better Site Desirm: A Handbook for Chanrzinf{ DeveloDment Rules in Your Community. Center
for Watershed Protection (August, 1998).
19 Site Planninrz for Urban Stream Protection, The Center for Watershed Protection and US EPA
December, 1995).
20 Slow Down You're f{oinf! Too Fast! The Community Guide to Traffic Calminf!. Public
Technology, Inc. (1998)
.
t2
August 17, 2000
.
.
.
INGERSON PROJECT REVIEW GROUP RECOMMENDA TIONS
The American Society of Civil Engineers, National Association of Home Builders and The
Urban Land Institute recommend the following pavement widths:
Access Street
Subcollector
Collector
22-24 '
26'*
36'**
* If on-street parking lines both sides of the street continuously, a 28-foot pavement may
be preferable.22
**Ifresidences do not front on the collector, a 24- to 26-foot pavement with shoulders is
ff!' 23
su lClent.
From a safety aspect, Greg Brown, BRW, acknowledged that a 24' -28' wide street was more
appealing.24
The traffic speed survey ofIngerson Road conducted on August 30,1999 by the Ramsey County
Sheriff's Department on behalf of Arden Hills showed that although the average vehicle speed
for the 559 vehicles recorded that date was 27.79 mph, the maximum speed recorded was 44
mph. 170 vehicles, or 30.4% of the 559 vehicles monitored, traveled at speeds greater than 30
mph on that date. In other words, the City possesses concrete evidence that indicates traffic
speed on Ingerson Road is at times excessive for the neighborhood.
A 1998 study conducted by the MN Local Road Research Board stated:
The 'old way' of traffic planning with wide, straight streets no longer seem to be suitable
for maintaining a livable neighborhood.25
The study also noted that one way to reduce traffic speed was to narrow the street.26
In addition to safety aspects, through articles and meetings, the Review Group became educated
on the major effects impervious surfaces play in stormwater management and water quality
considerations. One of the principal causes of stormwater pollution is impervious surfaces. 27
21 Better Site Desizn, supra.
22 The City of Arden Hills currently bans parking on the roadways from 2 a.m. - 6 a.m. daily, all
year round. Review Group members and project residents have advised the Review Group and
the Council that resident driveways provide adequate parking space and that on-street parking
rarely occurs and/or is necessary.
23 Residential Streets, supra.
24 May 16, 2000 Review Group meeting.
25 Effective Traffic Calminz Avvlications, supra.
26 Id. Also noted in Slow Down You're Goinz to Fast, supra and The Solution to Urban Traffic
and A New Vision (or Neizhborhood Livabilitv, Citizens Advocating Responsible Transportation
(1993).
27 National Resources Defense Council. Inc., http:/www.nrdc.org
13
August I7. 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDA TIONS
.
Even with the best management practices (BMP) enforced, moderate levels of impervious
surfaces block the natural infiltration of stormwater into the ground and increase the amount of
pollutants collected and accumulated which are eventually transported to aquatic systems.28
Many communities require that residential streets be 36 feet wide or more, even when
they serve developments that produce small volumes of traffic. These wide strects result
from blanket application of high volume and high speed highway design criteria, as well
as a perceived need to supply both on-street parking and unobstructed access for fire
trucks. However, residential streets are often unnecessarily wide and the excessive
widths contribute to making them the largest single component of impervious cover in a
subdivision. Narrowing residential street widths can help reduce the amount of
impervious cover created by excessive street widths requirements.29
Minimizing imperviousness, which is prevention focused, is more cost-effective than
treating stormwater runoff and much more cost-effective than restoring waterbodies after
they have been polluted or damaged. 30
According to Kate Drewry, Rice Creek Watershed District, District Administrator, the wider the
street the more impervious surface, which in turn creates more runoff and decrease of natural
infiltration. During her presentation to the Review Group, Ms. Drewry showed that the
percentage of runoff water increased dramatically and the percentage of infiltration decreased
dramatically when there was a higher percentage of paved surfaces.3! According to Derek
Knapp, P.E., Montgomery Watson, consulting engineering for the Rice Creek Watershed
.
28 Landscaoe Practices. The Roue-e River Proiect,
https://www.Waynecounty.com/rougeriver/ getinvol/tipland.htrnl, National Resources Defense
Council. Inc., http:lwww.nrdc.org and The Imoortance of Imoe",iousness, Watershed Protection
Techniques, Vol. I, No.3, Fall 1994.
29 Better Site Desie-n, supra.
30 Better Site Desie-n: A Handbook for Chane-in&, Develooment Rules in Your Communitv.
August, 1998 and Consensus Ae-reement On Model Develooment Princioles to Protect Our
Streams. Lakes and Wetlands. April, 1998, Center for Watershed Protection
Jl April 4, 2000 Review Group Meeting, Slide: Typical changes in runoff flows resulting from
paved surfaces.
.
14
August 17, 2000
.
.
.
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
District, fTom a water quality standpoint, the roadway options are as follows:
. Worst: (32' wide, full storm sewer, curb/gutter, regional ponds)
Increased volume, increased rate, increased water quality treatment requirements, full
ponding necessary, most costly.
. Better: (28' wide, full storm sewer, curb/gutter, regional ponds)
Maintained volume, increased rate, increased water quality treatment requirements, full
ponding necessary, slightly less costly.
. Best: (26' wide, needed storms ewer, surmountable curb, rain gardens)
Maintained volume, decreased rate, drastically reduced water quality treatment
requirements, elimination of regional ponds, significant cost savings.32
From a water quality standpoint, the Rice Creek Watershed District would like to see Arden Hills
maintain the existing street widths within the Ingerson Project and thereby reduce the amount of
impervious surface that contributes to stormwater runoff/pollution. 33
The Review Group learned that neither the surrounding City of Golden Valley nor Maplewood
increase street width during their PMP projects. Maplewood's streets are primarily 28' wide
with some streets as low as 20' wide.34
One ofthe arguments to increasing the street width within the Ingerson Project was to
"standardize" the widtlls of all Arden Hills streets. In view of the fact that rigid standards as to
street width have not been used in the past, the Review Group found this argument
unconvincing. Although some streets such as Stowe Ave. were reconstructed at 32', other Arden
Hills streets have been reconstructed at 24' (Pascal Ave.), 28' (Oak Ave.) and 30' (Dunlap and
portions of Tiller Ave.). Therefore, even if any ofthe streets within the Ingerson Project were
increased from 28' to 32', as proposed in the BRW feasibility report, the streets within Arden
Hills still would not be "standardized."
One Review Group member recommended that Hamline Ave. be rebuilt to MSA standards.
MSA representatives have advised that it is common for cities to request variances in street-
widths for MSA designated roadways and that such varianccs are often granted. Greg Brown
acknowledges the accuracy of this statement.
There have not been any significant changes within the Ingerson neighborhood (e.g. increase of
traffic, additional roadways added to the neighborhood, additional homes added to the
neighborhood, etc.) since the neighborhood streets were built in the 1950s. County and City
snowplows have navigated the roadways successfully for over 40 years. To the Review Group's
knowledge, there have not been any traffic or pedestrian accidents within the neighborhood that
could be contributed to the design of the current street width. However, there have been resident
complaints regarding the speed some motorist travel on the streets within the Ingerson Project.
32 April 4, 2000 Review Group Mceting.
3J Id.
34 City of Golden Valley web site and May 2, 2000 Review Group Meeting.
15
August 17, 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDA nONS
.
Residents do not want to see excessive speed on the Ingerson neighborhood streets and this can
only be accomplished through proper street design (e.g. not excessive street width).35 Some of
neighborhood residents advised the Council at the January 10, 2000 Council meeting that for
nwnerous reasons, they were opposed to the widening of any streets within the Ingerson Project.
Greg Brown, BRW, has acknowledged that he would be agreeable to maintaining the existing
'd h 36
street WI t s.
For a variety of reasons, the majority of Review Group members believe the widening of the
streets within the Ingerson Project is unnecessary and recommend that existing street widths be
maintained.
STORMWATER MANAGEMENT
Provisions for stormwater management were contained and discussed in the initial BR W
feasibility report and included:
. Digging up of all streets within the Ingerson neighborhood and installing storm sewer
piping;
. Curbs and gutters on all streets;
. Closure of Ham line Ave. north ofIngerson Road and installation of water holding
ponds; and .
. Rework of the stream that flows into Lake Josephine.
The Ingerson Proj ect residents were advised that one of the primary reasons for the inclusion of a
storm sewer was to eliminate "flooding" water that occurred on portions of Ingerson Road.37 A
numbcr of facts and issues were discussed at the various Review Group meetings:
. The area that accwnulates standing water spans only approximately 300' out of the
total Ingerson Project;
. The sloping ofthe existing roadway contributes to the ponding of water;
. The ponding of water dissipates after a few hours or days;
. Ponding water only occurs after major rain fall or spring snow melt;
. Ponding water occurs on the edge of the roadway but seldom occurs on the roadway,
and if on the roadway, only for short periods oftime; and
. Ponding water occurs in the residents' front and back yards, which would not be
corrected by any roadway improvement.
3S Residential Streets, supra.
36 May 16, 2000 Review Group Meeting.
37 It should be noted that photographs of the area in question showing standing water were taken
after the 1998 spring snow melt. In March, 1998, there was a total precipitation accwnulation at
the Minneapolis Airport of 4.56" compared to 0.32" in March, 1994; 2.11" in March, 1995; .
1.39" in March, 1996; 1.18" in March, 1997; and 1.86" in March, 1999. The average March
precipitation accumulation for March 1994-1999 is 1.9". Local Climatological Data, NOAA,
National Climatic Data Center, 1994-1999.
16
August 17, 2000
e
e
e
INGERSON PROJECT REVIEW GROUP RECOMMENDA TIONS
The American Socicty of Civil Engineers, National Association of Home Builders and The
Urban Land Institute acknowledge that
Even during a minor storm, some ponding of water at low points in the grade is inevitable
and, in some cases, may even be desirable when the expense of constructing an additional
. 1 . f: 38
In et IS a actor.
The residents of the Ingerson neighborhood acknowledge that it is prudent to attempt to
eliminate ponding water and instigate stormwater management policies. However, factors such
as cost, effectiveness, efficiency, needs, etc. must be incorporated into such decisions. It is the
belief of some of the Review Group members that the original feasibility proposal for stormwater
management are not cost effective or efficient and do not meet the needs of either the City or the
Ingerson Project community. The Review Group recommends that the City review and evaluate
alternative methods of stormwater protection such as the incorporation of rain gardens, catch
basins, vortex basins, centrifugal basins,39 concrete edge bands vs. curbs and gutters, etc. within
the project
Through her slide presentation, Ms. Drewry showed that:
Stormwater is a major contributor to water pollution in urban areas. Although each storm
sewer inlet contributes only a small number of pollutants, when added together, pollution
concentrations often exceed the limits established for industries and wastewater treatment
plants. If the pollutants entering each of these inlets can be reduced, so will the pollution
. t 40
In area wa ers.
Through articles and discussions, the Review Group has learned that ground water infiltration
methods are effective BMPs. Numerous articles support this contention:
The principal reason why infiltration is often a preferred method is that runoff is cooled
as it flows though the ground, thereby reducing the detrimental thermal effects that runoff
. 41
has on aquatIc ecosystems.
A primary goal of sustainable design in building and site development should be,
wherever possible, to retain water where it falls, treating the water as a resource, not
discharging it as a waste product. 42
38 Residential Streets, supra.
39 Since these types of drains are to ensure better water quality, Greg Brown felt that the City
could look to outside resources for funds or grants or the City's water quality fund.
40 April 4, 2000 Review Group Meeting.
41 Natural Resources Defense Council. Inc., http:/www.nrdc.org.
42 The Ecolorrv and Culture of Water, James M. Patchett, ASLA and Gerould S. Wilhelm, Pd.D.
(Revised June 4, 1997).
17
August 17. 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
.
Principles for Better Site Design [include] [w]here density, topography, soils, and slope
permit, vegetated open channels should be used in the street right-of-way to convey and
treat stormwater runoff.43
Plants absorb nutrients and metals to a certain extent and facilitate microbal breakdown,
but most of the pollutant removal from these practices occurs when the presence ofthe
plants physically blocks the stormwater flow, slowing the flow and allowing
contaminants to settle out. 44
[I]nfiltration practices also recreate, to a greater or lesser extent, the natural pattern of
water infiltration into the ground that existed before increased imperviousness covered
the land. When designed and installed correctly and maintained regularly, infiltration
practices are among the most effective structural BMPs.. ..Studies have shown that
infiltration of the [sic] can get 98 percent of storm water into the earth, cool stormwater to
550F, remove up to 83 percent of nitrogen, and remove up to 98 percent ofcopper.45
Alternative MethodslRain Gardens
Review Grono Recommendations:
All Review Group members recommend that feasible cost effective and efficient alternative .
methods such as rain gardens be reviewed and analyzed for the Ingerson Project as a
possible means of avoiding the installation of a storm sewer piping system.
Through discussions with Rice Creek Watershed District and Ken Haider, Maplewood, the
Review Group has learned that there are alternative methods to managing stormwater other than
the standard installation of a storm sewer system. The majority of the Review Group's
discussions centered on an alternative method known as rain gardens which utilize vegetation to
clean storm water at the location where the water falls.
Rain gardens consist of a vegetation garden that is placed in the City's right-of-way on residents'
lots. In simplistic terms, rain/water that falls on homes, lots, and streets, migrates to the rain
garden where it filters into the ground. "[Rain gardens] would enhance watershed ecological
quality, by slowing down storm water to infiltrate in sandy soil or be detained on heavier soils,
rather than sending storm water laden with sediment and urban pollutants directly through
gutters and pipes into area lakes or wetlands.'.46
43 Better Site Desirm: A Handbook for Chanf!inf! Develooment Rules in Your Communitv.
August, 1998 and Consensus Af!reement On Model Develooment Princioles to Protect Our
Streams, Lakes and Wetlands. April, 1998, Center for Watershed Protection.
44 Natural Resources Defense Council. Inc., http:/www.nrdc.org.
"Id. .
46 Brini!inf{ Garden Amenities into Your Neif{hborhood: Infrastructure for Ecoloi!ical Oualitv A
Guidebook for Cities and Citizens. Joan Iverson Nassauer, Brady Halverson and Steve Ross
(June 1997).
18
August 17, 2000
-.
'.
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
e
Rain gardens are not only aesthetically pleasing but "they manage storm water inexpensively and
build urban ecological health."47.48
Utilization of rain gardens is not only beneficial from a stormwater management and water
quality perspective but from a cost effective and efficient standpoint as well as an aesthetic
standpoint. Rain gardens have been installed and utilized in a number of locations in the United
States and a number oflocations within the Twin Cities. In the Twin Cities, the "leader" in
utilizing rain gardens is the City of Maplewood. Maplewood's first rain garden project was
constructed in 1996/1997. The year after construction, the Twin Cities experienced a 100 year
rainfall. Even with the incredible amount of rain that fell, there was only a little puddle of water
in the area and there was not any standing water on the roadway:9
Since construction of its first rain garden proj ect, Maplewood has completed its second rain
garden project and started it third rain garden project in the summer of2000. Maplewood has
found that street improvement projects that incorporate rain gardens tend to cost only 65-75% of
the cost of "conventional" street improvement projects.
The Rice Creek Watershed District is a proponent of the utilization ofrain gardens for
stormwater management and water quality. Derek Knapp, P.E., Montgomery Watson,
Consulting Engineering Firm for the Rice Creek Watershed District, believes that the Ingerson
neighborhood is amenable to alternative methods such as rain gardens. 50
e Greg Brown has presented preliminary plans/drawings identifYing the areas within the Ingerson
Project where he believes rain gardens could be utilized.
Rain gardens are installed in the City's existing right-of-way land and, therefore, there is no need
to redefine easement rights. Although it is desirable to have as many rain gardens as possible to
foster better water infiltration, it is not necessary to install rain gardens on every residentiallot,51
Derek Knapp believes that a rain garden in the front of every 3'd home equates to two (2)
National Urban Runoff Program ponds. 52
According to Greg Brown, an issue that he feels needs to be addressed is thc location and depth
of any utility line/pipe. Greg Brown believes that certain portions of the utility lines/pipes may
need to be insulated or relocated if rain gardens are installed. It should be noted that because
these utility lines/pipes are currently believed to be near the existing roadway, it would probably
e
47 Id.
48 Decrease in traffic speed may be another benefit of rain gardens. The MN Local Road
Research Board determined that "landscape plantings are thought to cause the average driver to
pay closer attention to his or her surroundings. If drivers have more to focus on, they will tend to
slow down." Effective Traffic Calminl!.. supra.
49 May 2, 2000 Review Group Meeting.
50 April 4, 2000 Review Group Meeting.
51 May 2, 2000 Review Group Meeting.
" April 4, 2000 Review Group Meeting.
19
August 17, 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
e
be necessary to insulate and/or remove and relocate all portions if the roadway width was
increased from its current width.
Although Greg Brown does not believe the east end of Ingerson Road (hill) is conducive to rain
gardens53, he does believe that catch basins, vortex drains or centrifugal chambers could be
installed at the bottom of the hill (by Femwood Ave. and Femwood Ct.). These devices would
capture runoff water and reduce the amount of runoff water flowing to the rain gardens located at
the west end/flat portion of Ingerson Road.
Both Rice Creek Watershed District and Greg Brown acknowledge and agree that the
incorporation of rain gardens would greatly reduce the need and/or size of any water holding
pond.
The Review Group believes that the rain garden concept could not only meet the needs of the
City's PMP but also help ensure improved water quality. Because rain gardens may satisfy the
dual objectives of effective water drainage and improvement of the area's water quality, a
majority of Review Group members feel the Council, City and engineering firm should work in
conjunction with a qualified independent landscape architect who is familiar with and has
expcrience in alternative stormwater management methods and the Rice Creek Watershed
District to determine the feasibility of such concepts within the Ingerson neighborhood.
Acceptance of Rain Gardens by Ingerson Project Residents
e
In July 2000 a survey was conducted to determine iflngerson Project residents accepted both the
concept of rain gardens and placement of rain gardens in their residential lots. The survey was
limited to residents that resided in areas that Greg Brown believes would be conducive to rain
gardens: Carlton Ave. and the lower portion of Ingerson Road. The residents were asked to
indicate yes or no to the following:
I(we) am (are) interested in having a Rain Garden in the street right-of-way part of our
property as an alternative to having the street modified to include storm sewers, curbs and
gutters.
53 The majority of Review Group members recommend that the City consider consulting with
individuals such as Derek Knapp, consultant for The Rice Creek Watershed District and/or Fred
Rozumalski, consultant for the rain garden projects in Maplewood, Como and other areas, who
have the expertise to determine ifrain gardens are feasible and appropriate within the area.
e
20
August 17, 2000
e
e
.
INGERSON PROJECT REVIEW GROUP RECOMMENDA TIONS
Survey questionnaires were given to 30 residents. The survey results are as follows:
20 Yes
1 No
2 Maybe*
.8. No response and/or residents not at home
31 Total
*2 residents were in favor ofrain gardens but did not want them installed in their yard because
they felt they could not maintain the rain gardens due to their age. One of these 2 also did not
want her existing hedges removed.
The survey results indicate that the majority of polled residents are in favor of the concept ofrain
gardens in lieu of a storm sewer system and would be agreeable to installation of rain gardens in
the City right-of-way on their property.
Financial Resonrces for Alternative Methods
A number of recognized local organizations believe that alternative methods such as rain gardens
are viable and should be incorporated into a city's PMP. The following organizations provide
financial resources/grants to cities for the construction of altemative stormwater management
methods:
Minnesota Department of Natural Resource
Environmental Partnership Grant Program and/or
Conservation Partners Grant Program
Sharon Pfeifer, Metro Region Grants Coordinator
651/772-7900
Rice Creek Watershed District
Kate Drewry, District Administrator
651/766-4191
Ramsey Soil and Water Conservation District
Tom Peterson, District Manager
651/488-1476
Metropolitan Council
MetroEnvironment Partnership Grant Program
Gary Oberts, Senior Environmental Plarmer
651/602-1079
21
August 17. 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATfONS
.
Curbs and Gutters
Review Grouo Recommendations:
All Review Group members recommend that the Ingerson Project not include the
installation of 6", or more, concrete curbs and gutters.
The majority of neighborhood residents that responded to the Dec. 1999 neighborhood
survey indicated that they are opposed to the installation of any curb and gutter system.
From a water quality standpoint, installation of curbs and gutters may be detrimental. To
maintain the integrity of the roadway without increasing the road width flat concrete edge
bands could be installed. Surmountable curbs could or should be installed in areas that
require control of water drainage.
Although there are some benefits to curbs and gutters, there are also disadvantages to such
structures:
The lack of a curb eliminates a major trap of airborne pollutants. In addition, runoff can
infiltrate into the soil during small and moderate storm events. Performance monitoring,
however, has shown that drainage channels only realize these benefits under ideal
conditions.. ..[D]ust, pollen, leaves, grass clippings, and organic matter can be trapped by .
the curb, where they remain until they are washed into the stormdrain system. 54
Both the City of Golden Valley55 and Maplewood56 acknowledge that some individuals do not
want curbs or gutters in the neighborhood and, if the majority ofthe residents do not want curbs
and gutters, the City does not propose or install curb and gutters in the roadway projects.
For water quality purposes, the Rice Creek Watershed District would prefer that curbs and
gutters not be installed. 57
According to information presented to and discussed by the Review Group, it is not necessary to
install curbs and gutters in areas that are utilizing rain gardens. 58
Arguments for the installation of curbs and gutters have included adding stability to the street
and/or facilitating snowplowing. Greg Brown has advised that, if necessary, the roadway can be
stabilized by the installation ofan approximately 16"-18" concrete edge band along the side of
the roadway. The roads within the Ingerson Project have been snowplowed by both County and
City personnel for over 40 years without any detrimental effect. Ken Haider, Maplewood,
54 Site Planninf! (or Urban Stream Protection, The Center for Watershed Protection and US EPA
(December, 1995).
55 City of Golden Valley web site.
56 May 2, 2000 Review Group Meeting.
" April 4, 2000 Review Group Meeting.
" See also Residential Streets, supra.
.
22
August 17, 2000
-.
.
.
.
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
advises that his personnel have not encountered any snowplowing problems/issues where curbs
and gutters have not been installed. 59 Some Review Group members believe the incorporation
and cost of installing curbs and gutters for snowplowing purposes is neither cost effective nor
efficient and these arguments for curbs and gutters are without merit.
The majority of residents within the Ingerson neighborhood have expressed their view that they
do not want curbs and gutters installed in their neighborhood.60 The Review Group recommends
that if the majority of residents do not want curbs and gutters that the City follow the examples
of both the City of Golden Valley and Maplewood and not install curbs and gutters.
If, however, the Council does not accept the recommendations of the Review Group and
determines that curbs and gutters are to be installed, some Review Group members recommend
that surmountable curbs like those constructed on Oak Ave. be installed and, if installed, a dye to
dull the color be mixed into the concrete. They feel that at the maximum, only 4" curbs should
be installed in areas that require control of water drainage.
Water Holding Ponds
Review GrOUD Recommendations:
Four (4) members of the Review Group believe that by incorporating alternative methods
to address stormwater runoff, the holding ponds in the area between Hamline Ave. and
Snelling Ave. are unnecessary. Three (3) members ofthe Review Group believe that the
project should incorporate the installation of a holding pond in this area.
Before any final decision abont holding ponds is made, the City and Engineering staff
should obtain additional information regarding the area, including whether it currently
meets the needs from a water quality standpoint and information regarding the anticipated
water quantity for this area.
The initial BRW feasibility plans called for the construction of two (2) large water holding ponds
in the area between Hamline Ave. and Snelling Ave. According to BRW, the sole purpose of
these holding ponds would be to infiltrate water before entering Lake Joharma, which is located
in another Arden Hills area. Some residents of the Ingerson neighborhood believe the
construction of such ponds in this location is unnecessary, would create children safety issues
and would be destructive to the aesthetic view of the neighborhood as it would disrupt and
change the current contour ofthe land. In addition, any removal of existing trees and vegetation
to create these holding ponds would substantially decrease the current natural noise and visible
barrier it provides and thus decrease the market value ofthe area. A pond created by the City of
Eagan proved to be extremely damaging after the July 8, 2000 rainfall.
The use of rain gardens for stormwater management would reduce the need for installation of
holding ponds in the Ingerson neighborhood since a rain garden in front of every 3 homes
"May 4, 2000 Review Group Meeting.
60 January 10,2000 Council meeting.
23
Augus/17, 2000
INGERSON PROJECT RE VIEW GROUP RECOMMENDATIONS
.
equates to double the size of a regional pond.61 Ms. Drewry stated that if water is given the
opportunity to infiltrate (e.g. through rain gardens) there is no need to build ponds. Ms. Drewry
further advised that the best National Urban Runoff Program (NURP) ponds remove only 60% of
the phosphorous, a major pollutant, from water. Elimination of the holding ponds would also
reduce overall construction costs and future City maintenance and clean-up expenditures.
The initial BRW feasibility report failed to take into account the fact that a large portion of the
land situated between Hamline Ave. and Snelling Ave. is privately owned. Before any
installation of ponds could take place a land survey would be necessary to determine the
boundaries ofthe privately owned land.
Although topographical maps indicate that runoff water from the Ingerson and Tiller
neighborhood flows into this area, the BRW report failed to identify the current amount of water
and the anticipated amount of water that will flow into this area.
Some Review Group members and Ingerson Project residents have been monitoring this area as
well as the Lake Josephine stream both before and after rainfall including substantial rain fall.
This area and its streams in their current structure do collect water. However, neither the area
nor the streams have ever overflowed and it appears that the current structure, with some clean-
up modifications and/or weirs, is sufficient for its purposes. Assuming this information to be .
accurate, some Review Group members and Ingerson Project residents believe that if a holding
pond is built in this area, the pond will sit at a low or empty level the majority of time. If this
occurs, the pond has not met its purpose and it would be unsightly and an unnecessary costly
expenditure to the City and thus the residents of Arden Hills.
Holding ponds are not just bodies of water that do not require regular expensive maintenance at
the cost of the City. If sediment that is collected by holding ponds is not removed on a regular
basis, the holding ponds are no longer effective. In addition to regularly scheduled maintenance
and clean-up, the ponds must be cleaned after significant rainfall so that the sediment collected
does not flow through if another significant rainfall occurs shortly thereafter. It should be noted
that the Rice Creek Watershed District is budgeting $75,000 annually for sediment removal from
holding ponds.
It was recommended by some Review Group members that if any type of holding ponds are
considered, they should be located on the west side of Snelling Ave. which would not be as
aesthetically disruptive to a neighborhood yet serve the same purpose as a pond constructed on
the east side of Snelling Ave. Greg Brown advised the Review Group that his PMP proposals for
future projects may utilize the area on the west side of Snelling Ave. for holding ponds for that
area.
Natural, but overgrown, streams currently run within the area between Hamline Ave. and
Snelling Ave. and flow westward under Snelling Ave. and natural wetlands are located between
Ingerson Road and Tiller. Ifrain gardens are incorporated within the Ingerson Project, the need .
61 May 2, 2000 Review Group Meeting.
24
August 17. 2000
-.
.
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
and/or size of the holding ponds are decreased substantially, ifnot eliminated. Instead of
installing holding ponds, the existing natural streams could be cleaned,62 the natural area should
be revegetated for maximum water control improvement and weirs could be incorporated
The City should work closely with the Rice Creek Watershed District, the Arden Hills water
quality committee and an cnvironmentallandscape architect or engineer on the development and
design of any water quality methods for this area. Any work done to this area should maintain
the existing natural setting and should be landscaped so it continues to provide the natural setting
desired by the residents.
Closure of Hamline
Review Cronp Recommendations:
The Review Croup is split on whether Hamline Ave. should be permanently closed. If,
however, Hamline Ave. north of Ingerson Road is not reconstructed and is closed, all
Review Croup members recommend the area be landscaped appropriately to maintain the
natural setting of the area.
.
A concern the Review Croup has about the closure of Hamline Ave. is the detrimental
effect it may have on the traffic speed in this area. Based upon current knowledge of the
traffic speed in this area (fast speed around the Hamline/Ingerson intersection), Review
Group members believe traffic speed may increase in this intersection if the stop signs are
removed andlor if the area is designed without taking into account area traffic speed. By
landscaping appropriately, residents will utilize this area for recreational henefit. It is the
recommendation of the Review Group that this area not only be landscaped appropriately
but that design considerations be given in regards to the potential effect on traffic speed
and residents' safety.
Those Review Group members that favor permanent closure cite the significant cost of
reconstruction due to the poor soil conditions at the site. Traffic considerations were the factors
for those Review Group members that believe Hamline A ve_ should remain open. (One Review
Group member was not present for the discussion.)
The initial BRW feasibility report proposed to permanently close Harnline Ave. north of
Ingerson Road. The major argument for the closure of Ham line Ave. is due to the significant
cost that would be incurred by the City to improve the roadway. City staff advises that Hamline
Ave. north of Ingerson was improperly constructed. For the most part, homes do not abut this
portion of Hamline Ave. so any repairs would need to be absorbed by the City.
The original BRW feasibility report also indicated that this portion of Hamline Ave. needed to be
closed in order to constructed the recommended holding ponds. If holding ponds are eliminated
. 62 At the 7/6100 Review Group meeting, Dwayne Stafford advised that one of the natural streams
running from the wetlands has been plugged by debris.
25
August 17, 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
or their size reduced, a significant reason for closing this portion of Hamline Ave. would be
eliminated.
From June 13 to July 4, 2000, vehicle traffic counts were taken on Hamline Ave. south of
Ingerson Road, Ingerson Road and Dunlap Ave. Barricades were installed on June 23, 2000
north of the Ingerson Road/Hamline intersection that prevented traffic flow on Hamline Ave.
north ofIngerson Road and the vehicle traffic count continued.63 The meters were only
operating part of the day on June 13 and July 4,2000, so those numbers were discounted in our
calculations. June 23 was a transition day with the barricades up for less than the complete day,
so those numbers were also eliminated from the calculations. Since July 1 through July 3 were
days just prior to the July 4 holiday, we discounted those numbers as well. Then we arbitrarily
discarded the numbers for June 21 and June 22 so that we ended up with data for seven
sequential days with the street open and seven sequential days with the street closed.
The subsequent distilled metering results are as follows:
June 14 - 20, 2000
June 24 - June 30, 2000
In erson Road
2755/7 = 393.6
4330/7 = 618.6
Dunla Ave.
694/7 = 99.1
2071/7 = 295.9
Hamline Ave.
4532/7 = 647.4
4391/7 = 627.3
These vehicle metering results indicate that the number of vehicles traveling on Ingerson Road
increased by an average of 57% after the barricades were placed on Harnline Ave. The results
also indicate that the number of vehicles traveling on Dunlap Ave. increased by an average of
198% after the barricades were placed on Hamline Ave. At the same time, traffic counts taken
on Hamline Ave., which counted virtually all vehicles that approached or left the intersection
where the closure actually occurred, decreased slightly. In other words, ifHarnline Ave. north of
Ingerson Road is closed to traffic, traffic will increase substantially on Ingerson Road and
especially on Dunlap Ave. where traffic counts nearly tripled. Increased traffic may also equate
to increased traffic speeds on the roads in question.
The Revicw Group acknowledges that according to Dwayne Stafford, only 4 Ingerson Project
residents called the City to complain about the Hamline Ave. closure. The Review Group is
concerned that the Ingerson Project residents may not have realized that they needed to contact
the City and voice any concerns about the Hamline Ave. closure. Another concern of some
Review Group members is the residents on Dunlap Ave. where traffic more than tripled. None
of the residents on Dunlap Ave. received a notice explaining why the roadway was temporarily
closed nor information on who to contact ifthey had concerns. Before any decision is made
about the closure of Harnline Ave., the Review Group recommends that the Council poll the
affected residents, both the Ingerson Project residents and the Dunlap Ave. residents, to
OJ In addition to vehicle count, the meters also read vehicle speed. However, because of the
placement of the meter readers (e.g. right in front of a stop sign where one would obviously
decrease their vehicle speed), the Review Groups feels that any results from the vehicle speed
meters should be discounted and void. Greg Brown concurs.
26
August 17, 2000
.
.
.
e
"'\ I:
~~'
e
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
determine if they are or are not in favor of the closure. If Hamline Ave. north of Ingerson Road
is closed, the Review Group recommends that not only the design/landscaping be appropriate for
the area but also that considerable safety design consideration be given (e.g. installation of stop
sign on Hamline Ave. at the Ingerson Road intersection).
STREET STRUCTURE
Review GrouD Recommendations:
The original BRW feasibility report suggested that all roadways within the Ingerson
Project be reconstructed down to the subbase. The Review Group members recognize and
acknowledge that the City must maintain the life of a roadway. The majority of Review
Group members recommend that the current subbase structure of each roadway be
reviewed individuallv, taking into account the roadway usage, to determine if it is
necessary to reconstruct the subbase for that particular road. If a subbase does not need to
be reconstructed, the road should merely undergo a 2"- 6" cold recycle overlay, provided
that the end product is a road with a consistent life expectancy throughout, which is
commensurate with reconstrncted roads of the same type.
There was considerable debate during the Review Group meetings over the existing street
subbase. Greg Brown contends that the roads in questions should be dug up approximately 2-
2.5'and that the subbase should be replaced. This is obviously a costly endeavor to both the City
and the residents. Some Review Group members believe that, based upon the appearance of the
roads in the area, a complete reconstruction of all roads in the neighborhood is not warranted.
The roads in the Ingerson Project area were constructed in the 1950s. Some or all of the subject
roads have undergone 1-2 pavement overlays. The majority of roads within the project do not
show any evidence of deterioration such as cracking, crumbling, etc., which would be signs of a
poor subbase.64 Femwood Ct. was constructed in 1961, was overlaid in 1989 and was sea1coated
in 1996. If the roadways are not deteriorating, it would seem reasonable to assume that the
current subbase is adequate and sufficient for the neighborhood needs. According to Greg
Brown, an overlay would not "seal"/correct any underlying roadway cracks. However, both
Dwayne Stafford and Greg Brown acknowledge that even a newly installed road will eventually
show cracks and deterioration.
Some Review Group members believe that the cost ofreconstruction is exorbitant to both the
residents and the City. Greg Brown advised that the cost of a full reconstruction of the roadway
would cost approximately $ I 80-$200 per foot vs. $65-$85 per foot for the cost of a 4" cold
64 There are areas on the roadway that do appear to have "sunk" or cracked. However, these
areas were dug up by the City and/or utility workers for repair of utilities. Poor
repavement/patching is the cause of any deterioration in these areas.
27
August 17, 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
.
recycle with Bituminous curb.65,66 It is obvious from a cost standpoint that the cold recycle
approach would provide an enormous cost savings to both the City and the residents67
The Review Group acknowledges that some roadways within the project (e.g. Ingerson Ct.,
Carmon) may need to undergo full reconstruction due to their present condition. However, not
all streets within the project may be in need of full reconstruction. Greg Brown advises that
"dual" improvements (some roadways undergo full reconstruction and some roads only undergo
cold recycle replacement) are possible68 The Review Group suggests that this approach be used
for the Ingcrson Project provided, however, that the end product is a road with a consistent life
expectancy throughout, which is commensurate with reconstructed roads of the same type.
LAKE JOSEPHINE
Review Group Recommendations:
The original BRW feasibility report proposed to reconstrnct the stream that runs into Lake
Josephine by Fernwood Court and Ingerson Road. A resident and/or the Lake Josephine
Association (comprised of residents along Fernwood Court and Ingerson Road) privately
own this land.
The Review Group acknowledges that water quality standards must be addressed. By
incorporating alternative methods for stormwater runoff in the Ingerson Project, the City .
can significantly decrease the amount of water flowage into the Lake Josephine stream off
Ingerson Road. Before any design proposal is undertaken for this area, the City and
Council should obtain further information about whether or not the area/stream currently
meets the needs of the City and water quality standards and the water quantity anticipated.
The Review Group acknowledges that the Conncil has received recommendations
submitted by the Lake Josephine Association.
This land provides not only recreational value but also homeowner market value to the
owners. For these reasons, as well as the reasons cited below, the Ingerson Project
residents as well as the Review Group members are opposed to the taking of any ofthis
land. If, bowever, any changes are made to this private property (e.g. increase stream
width by approximately 6"), the City should provide tangible and/or monetary
consideration to the owners of any land impacted by the change.
The original BR W feasibility report included reconstruction of the stream that runs into Lake
Josephine near the intersection ofFernwood Court and Ingerson Road. The BRW feasibility
report failed to take into account that the land that the stream flows through is privately owned
by a residcnt and/or the Lake Josephine Association, failed to identifY the current amount of
65 Greg Brown's estimates are based upon a 32' roadway.
66 Cold recycle can be done in increments of2", 4", 6", etc.
67 It needs to be noted and acknowledged that BRW's project monetary compensation is based
upon the total project costs. Obviously, if the roadways are not reconstructed, the project costs
decrease significantly.
68 July 6, 2000 meeting.
.
28
August I7. 2000
tit
.
tit
INGERSON PROJECT REVIEW GROUP RECOMMENDA TlONS
water that flows into the stream, failed to identify the anticipated amount of water that will flow
into this stream and failed to identify accurate elevation information.
Mu.f'r"ttJ:..-.
The Review Group recognizes that "clean water and healthy equRtic [sic] environments have
significant value to the community and economy.,,69 However, the subject property not only
provides its owners with private access to Lake Josephine and aesthetic value but considerable
market value to the homes. When selling homes within the neighborhood, it is not unusual for
the homeowner to include lake land ownership as a market consideration and value. Nor is it
unusual for a buyer to recognize the market value of such land. Loss of any portion of this land
would not only reduce the property's recreational value but could also decrease the market value
of their homes.
As stated above, some Review Group members and Ingerson Project residents have been
monitoring this area both before and after rainfall, including substantial rainfalls. Rarely is water
seen flowing through the stream into Lake Josephine. When the water level of Lake Josephine
rises, lake water flows into the stream. The Lake Josephine waters nurture wetlands in the area,
which provide habitat for various fish and animals. No analysis has been conducted to determine
if any BRW design proposed would have a detrimental effect to the wetlands and/or its
inhabitants.
If rain gardens and/or proper drain basins are incorporated into the project, the amount of water
runoff into the stream is decreased significantly ifnot eliminated.
It is the recommendation of the Review Group that the Council, City and engineering firm work
with the private homeowner and the Lake Josephine Association members in designing methods
that would provide water quality benefits to Lake Josephine and the surrounding area without
reducing the current recreational and market value of ownership of this property. If the stream
and surrounding area needs to be modified, such methods might include just the deepening of the
stream, installation of a weir, etc. which would not have a major detrimental effect on the
property but yet provide water quality management of water entering Lake Josephine.
NEIGHBORHOOD/RESIDENT INVOLVEMENT
Review Group Recommendations:
Although the Review Group was not charged to make recommendations about future PMP
projects, the Review Group does recommend that the process he modified to allow
residents an earlier opportunity to have input into each project. Specifically, the Review
Group suggests the following process:
1. City staff prepare and publish a map of anticipated projects scheduled over
the next five years;
69 National Resource Defense Council. supra.
29
August 17, 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
It
2. City staff present conceptual designs to the affected residents of a project one
(1) year in advance of the final feasibility report;
3. City staff provide a process and adequate time for residents' input by
holding meetings with affected residents to explain details of the proposed
project design once preliminary snrvey and design work has been completed;
and
4. City staff consider residents' comments on the proposed design in developing
the final feasibility report to the Council.
Lessons have been leamed by the Review Group and hopefully the Council, City staff and
engineering firm that would be applicable in future pavement management projects.
The major complaints from the residents have been lack of information, insufficient time in
which to respond to the Council's proposed project, and lack of resident involvement in the
proposed project.
The Review Group obtained an explanation of the process used in Maplewood during one of its
meetings. Ken Haider, Maplewood, stated that it was Maplewood's objective to involve its
residents in all the projects. Haider and/or his staff meet 1-2 times with the residents in the
spring to discuss the residents' pavement/street needs. It is not until after these meetings that a e
feasibility report is drafted in the fall for Council's review. Haider advises that at times, plarmed
projects were discontinued in the spring, before any feasibility report was prepared, when it was
determined that projects would or could not meet the needs of the residents and/or were not
readily accepted by the residents.7o
From the design of its web site, one can tell that the City of Golden Valley strives to
continuously keep its residents informed of its pavement improvement projects. One page of
their web site describes their pavement policy program and other web site pages are dedicated to
. 71
current projects.
Once the City of Arden Hills develops its web site, information regarding current and future
projects should be posted for easy access by all concerned.
CONCLUSION
One of the recommendations ofthe Review Group to the Council, staff and engineering firm is
that the needs, wants and values of the residents be considered in the final recommendations for
the Ingerson Project. There were and are certain values the residents took into consideration
when they chose to move into the area and they want these values to continue and not be
destroyed. We believe the recommendations incorporated within this report provide sound,
economical and feasible alternatives to the City's PMP for the Ingerson Project.
It
70 May 2, 2000 Review Group Meeting.
71 City of Golden Valley web site.
30
August 17, 2000
".
.
.
.
lNGERSON PROJECT REVIEW GROUP RECOMMENDATiONS
The Review Group wishes to express its gratitude to the Council for allowing the formation of
such a group and recognizing the benefits of project input from residents. The Review Group
also wishes to acknowledge the commitment of the Council, staff, Greg Brown and the Review
Group members. Ifthe Council desires additional information, input and/or involvement from
the Review Group, they should contact Linda Swanson, Chairperson.
31
August 17, 2000
CoU,...C.I""
frPP~
?l~(1tIAVGf ."'
INGERSON PROJECT REVIEW GROUP RECOMMENDA TIONS
.
APPENDIX A - BACKGROUND
In 1999, at the request of the Arden Hill's City Council, BRW, the City's outside engineering
consulting firm, developed a PMP neighborhood priority plan.72 The Ingerson neighborhood
was slated as the first neighborhood that fell under the City's PMP.
On November 30, 1999, the City of Arden Hills, through its consultant Greg Brown, BRW
Engineering, prescnted a feasibility study to the residents that reside on Ingerson Road, Ingerson
Court, Femwood Road, Fernwood Court, Hamline Avenue, Carlton Drive, Canon Avenue, and
Tiller Lane (collectively referred to as the Ingerson Project area). The feasibility report included,
but was not limited to, the following designs:
. Widening of streets from their existing widths (24'-28') to 32';
. Possible removal of trees, shrubs and other plant life to accommodate a 32' road;
. Curb and gutters along all roads;
. Installation of storm sewer piping;
. Reconstruction of the ditch that flows into Lake Josephine (which flows through land
privately owned by a resident and by the Lake Josephine Association);
. Closure of Harnline Avenue north of Ingerson Road; and
. Installation of two (2) holding ponds in the land situated between Harnline and .
Snelling Avenue.
On January 10, 2000, the City of Arden Hills held a public hearing to discuss the Ingerson
Project. At the January 10, 2000 public meeting, numerous residents of the Ingerson Project area
vigorously and vocally advised the Council that they were opposed to the BRW feasibility plans
as designed. (See January 10,2000 meeting minutes for summaries ofresident comments.)
At the February 14, 2000 Council meeting, the Council decided to temporarily table the Ingerson
Project as designed and formed a Review Group to review the Ingerson Project and make
recommendations to the Council. The Review Group consisted ofthe following individuals:
Linda Swanson, Resident and Chairperson*
Steve Baker, Member ofthe Arden Hills' Plarming Committee'
Greg Brown, BRW engineer
Teresa Cain, Resident representative'
Dave Grant, Arden Hills Council Member
Dick Hanson, Resident'
Gregg Larson, Arden Hills Council Member
Terry Nygaard, Member of the Arden Hills' Operations and Finance Committee'
Christine Peterson, Resident'
Yvonne Wilken, Resident'
*Voting Member .
72 "Commercial" roadways were not incorporated into this plan.
32
August 17, 2000
.
.
.
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
The Review Group resident members were composed of residents from various locations within
the project: Ingerson Road (east end/top of hill [Swanson] and west end/lower portion
[Wilken]); Hamline Ave. (Hanson and Cain, Executive Director of Little Brothers Friends of the
Elderly, property owner on Hamline) and Carlton Drive (Peterson).
The charge of the Review Group was:
To evaluate and make recommendations regarding the scope of a road
improvement project for the Ingerson neighborhood.
February 14,2000 Council Minutes.
The Review Group met twice a month (every 1st and 3rd Tuesday) from March 21, 2000 through
August I, 2000. After the first Review Group meeting, a notice was mailed by the City to the
Ingerson Project residents advising them ofthe formation of the Review Group; the identity of
the Review Group members; the dates, times and location of the meetings and a tentative agenda
for the following two (2) Review Group meetings. It was neither the intent nor the purpose of
the Review Group to determine specific project specifications. Rather, the Review Group
attempted to assimilate and review information that would be pertinent to the Ingerson Project.
Although all Review Group meetings were open to the public, questions/comments raised by the
public were not addressed during the meetings. Rather, questions/comments could be raised and
discussed by participants after the meetings and/or could be addressed by individual Review
Group members at any time. Through written and verbal communications, the Ingerson Project
residents were encouraged to contact the Review Group members if they had any questions
and/or information relevant to the Ingerson Project.
The majority of the meetings consisted of discussions and/or comments by Greg Brown that
pertained to the original design and and/or altemative designs. Additional meeting speakers
included:
Kate Drewry, District Administrator Rice Creek Watershed District;
Derek Knapp, P.E., Montgomery Watson, Engineering Consulting Firm for the Rice
Creek Watershed District;
Ken Haider, Public Works Director, Maplewood; and
Terry Nygaard/Terry Post, Arden Hills representatives, re: Assessment information.
In addition to discussion meetings and speakers, the Review Group reviewed various printed
materials.
The final recommendations ofthe Review Group were formulated by the voting members of the
Review Group.
33
August 17, 2000
INGERSON PROJECT REVIEW GROUP RECOMMENDA TIONS
The Ingerson Project is the first of many projects scheduled under Arden Hills' PMP. It is the
hope of the Review Group that some of the recommendations put forth to the Council for the
Ingerson Project may also be applicable for future roadway projects within Arden Hills.
34
AugustI7,2000
.
.
.
.
.
INGERSON PROJECT REVIEW GROUP RECOMMENDATIONS
APPENDIX B - REFERENCED ARTICLES
Asvhalt Rebellion. The. Alan Ehrenhalt, Executive Editor of Governing Magazine,
http://www.islandnet.comlITE_BClNov97_Asphalt.html
Better Site Desir;n: A Handbook for Chaneinr; Develovment Rules in Your Communitv. August, 1998
and Consensus Aereement On Model Develovment Princivles to Protect Our Streams. Lakes and
Wetlands. April, 1998, Center for Watershed Protection
Brineine Garden Amenities into Your Neiehborhood: Infrastructure for Ecolovical Oua/itv. A
Guidebook for Cities and Citizens. Joan Iverson Nassauer, Brady Halverson and Steve Ross (June 1997)
Bulletin. The, March 22, 2000
City of Golden Valley PMP, http://www.ci.golden-valley.mn.us/streets/pmp.htrn
Ecolof!V and Culture of Water. The, James M. Patchett, ASLA and Gerould S. Wilhelm, Pd.D. (Revised
June 4, 1997)
Effective Traffic Calmine Avv/ications and Imvlementation. MN Local Road Research Board (October
1998)
Flood Insurance, STAR, July 29,2000
Imvortance of Imverviousness. The. Watershed Protection Techniques, Vol. I, No.3 - Fall 1994
Landscape Practices. The RoufEe River Project,
http://www.Waynecounty.com/rougeriver/getinvol/tipland.htrnl
Local Climatoloeical Data, NOAA, National Climatic Data Center, 1994-1999
Natural Resources Defense Council. Inc., http:/www.nrdc.org
Residential Streets, Second Edition, 1990, American Society of Civil engineers, National Association of
Home Builders, The Urban land Institute
Site Plannine for Urban Stream Protection, The Center for Watershed Protection and US EP A
(December, 1995)
Slow Down You're Goin,? Too Fast! The Communitv Guide to Traffic Calminr:. Public Technology, Inc.
(1998)
Solution to Urban Traffic and A New Vision for Neir:hborhood Livabilitv. The, Citizens Advocating
Responsible Transportation (1993)
35
August 17, 2000
~,
-"
"
e
CITY OF ARDEN HILLS
MEMORANDUM
DATE:
August 17, 2000
TO:
Joe Lynch, City Administrator
FROM:
Dwayne Stafford, Public Works Director
SUBJECT:
Ingerson Road Improvement Group
e
Backl!round
The Arden Hills City Council was presented with a preliminary feasibility report at a
council meeting last November, which idcntified the Ingerson Road/Hamline Avenue
area for street improvements in 2000. Many residents attended an informational meeting
and the council meeting and expressed dissatisfaction with the proposed improvements
for various reasons. At the February 14th, Council Meeting, the Council approved the
formation of a review group to study the need for the project, (what brought us to this
point) and to review city street standards and other design options, followed by a
recommendation to Council from their point of view. Council appointed Linda Swanson,
an Ingerson Road resident to chair the group.
The review group would consist of five residents ofthe proposed project area, including
the chairperson, two council members to act as liaisons, two Arden Hills residents not
from the project area, the City Engineer and the Public Works Director. City Council
members, the City Engineer and the Public Works Director would not have input on the
group's final recommendation to the City Council.
Review Group Meetin~s
The Ingerson Road Improvement Group met ten times over a period of six months.
Discussions ranged over all aspects of street improvements and storm water quality
improvements. Guest speakers included the Public Works Director from Maplewood and
representatives from the Rice Creek Watershed District. City Accountant, Terry Post,
also attended one meeting to explain the City's Assessment Policy. About half ofthe
discussions were related to rain gardens. The meetings were open to anyone, and many
residents attended one or more of the meetings.
Outcome
Although the City Engineer and Public Works Director's recommendations may differ
from those offered by the review group, the City is very appreciative of the group's open-
mindedness, hardwork and dedication. Everyone learned from the experience and a
mutual respect was gained for each other among all participants.
e
Attachments
Attached are recommendations from the Arden Hills City Engineer and Public Works
Director for improvements to streets in the Ingerson Road/Hamline Avenue area.
2000 Pavement Management Program
Ingerson Neighborhood
Draft Recommendations from Staff
The following recommendations from staff are provided for the use of the City Council in
determining the direction to proceed with the 2000 PMP. The recommendations are a result of
discussions held at task force meetings and discussions between the Public Works Director and
City Engineer during the past several months.
Does the selection of the Ingerson Neighborhood for the 2000 PMP have merit?
YES
The neighborhood was selected due to several factors which independently may not be
significant enough to raise the neighborhood priority, but collectively push this neighborhood to
the top of the list for reconstruction.
. Pavement Condition Index: The weighted neighborhood index is approximately 56 and at
the lower end of the spectrum of City neighborhoods. In the past reconstruction of streets
has been generally done when PCI's are below 60.
. Drainage: The neighborhood has low, flat areas along Ingerson Road between Hamline
Avenue and Fernwood Street and along Cannon Avenue which routinely pond water for
several hours following rainfall events. Drainage infrastructure in the neighborhood is
lacking in these areas and several backyards apparently experience routine flooding.
. Water Quality: The eastern neighborhood runoff empties directly into Lake Josephine
untreated and the western neighborhood runoff empties into a wetland/ditch system on the
west side of the neighborhood. The potential for improvement of the water quality of runoff
running directly into natural water bodies is a contributing factor in the selection of this
neighborhood.
. State Aid Funding: The city state aid construction account balance will be approximately
$430,000.00 in 2001. Of the five highest priority neighborhoods, only Ingerson Road and
Hamline Avenues are eligible for state Aid funds. The only other city street programmed for
reconstruction in the near future that is also eligible for state aid funding is West Round Lake
Road. The timing is right for use of these funds for a neighborhood project.
. Standards: The streets identified for reconstruction do not meet current city standards for
width, pavement section or curb and gutter. Although as a part of the city wide review of
street conditions, staff is recommending revisiting some standards. The underlying goal of
the city PMP is to bring some level of uniformity of design throughout the city - currently
this neighborhood does not have much uniformity.
. City Infrastructure Management: The City has the responsibility of insuring safe, functional
streets and utilities throughout the city. Since financial resources are limited, a consistent
program of improvements is necessary to insure that the City is not saddled with excessive
costs to improve its infrastructure down the road. The complete reconstruction of a street is
financially viable about every 40-50 years based upon current city budgeting and mileage of
streets under city jurisdiction. The proposed improvements are on streets that have not been
reconstructed since their original construction (approximately 40 years) and have several
deficiencies as noted above.
......
r
e
.
.
r~
~
.
e
e
e
. The proposed improvements are a substantial investment into City infrastructure which
should have a positive effect on the neighborhood property values as well. The City of
Eagan had estimated typical residential street improvements to add $3,000.00 to $4,000.00 of
value to properties.
.
Should the reconstructed streets include concrete curbs and gutters?
Yes
The existing streets do not have concrete curb and gutter however some sections of the streets
have deteriorated bituminous curbs while others have "sod" curbs at the edge of the bituminous
pavement. Ramline Avenue currently does have an existing rural section with ditches or low
areas on both sides of the roadway. The area grades range from very flat to moderately hilly and
most front yards slope into the roadway and have trees relatively close to the edge of the road.
Staff recommends that concrete barrier (vertical face) curb and gutter be installed throughout the
project with the exception of areas that may be selected for rain gardens or the rural section of
Hamline A venue. Concrete barrier curbs provide a solid "bookend" to the bituminous pavement,
provide for better snow plowing, less potential of cars running over front lawns and increased
efficiency of the drainage system. The existing topography of the neighborhood lends itself to
curbing and concrete curbing is a great deal more durable than bituminous curbing as is apparent
by the dilapidated condition of the existing bituminous curbing. In rain garden areas or rural
section areas, a 24 inch concrete edge strip (with no vertical curb) is recommended in order to
provide the "bookend" for the bituminous pavement and also blend with the concrete curb look
throughout the rest of the neighborhood.
Street Structure
Staff recommends that the streets be removed and reconstructed to current standards including a
sand subbase, gravel base and bituminous surface. The sand subbase is desirable in order to
provide subdrainage for the integrity of the roadway section. The task force discussed the
possibility of overlays or cold-in-place recycling of the pavements without a 2 foot cut. Cold-in-
place recycling is significantly cheaper in the short run however the roadway subbase would still
be more susceptible to freeze thaw and saturation after rainfall events than the recommended
sand subbase section. In addition, overlays and in place recycling don't allow for corrections to
low points, humps or other undesirable surface irregularities which would be corrected with a
full depth reconstruction.
The existing pavement of Fernwood Court is in very good condition today (1999 rating of 86)
and may not warrant replacement due to the very limite;d amount of traffic on it. Staff
recommends constructing edge strips and/or concrete curbing around Fernwood Court and
overlaying the surface in lieu of full reconstruction.
:'
The merits of a drainage subbase along the Ingerson Road "hill" east of Fernwood Street were
discussed since hills generally shed water very well as opposed to flatter profiles and therefor
have less need for subdrainage. Although these points are true, the monetary savings would be
approximately $25.00/per foot of roadway (10% of roadway cost), differential settling at the
transition from sand subbase to no subbase would likely cause a dip or bump in the roadway in
that area and a lower level of performance would still be expected from the non subbase roadway
over the long run. Staff recommends that a drainage subbase be included throughout Ingerson
Road.
f'
e
Street Width
Hamline A venue and Ingerson Road; 30 feet face to face of curb. (local collector)
Carlton Drive, Cannon Avenue and Fernwood Street: 28 feet face to face of curb. (local)
Ingerson Court and Pernwood Court: 24 feet face to face of curb. (special case)
Either driveway aprons or concrete valley gutters are proposed for Pernwood Court and Ingerson
Court to help delineate these two minor cul-de-sacs from Ingerson Road.
Hamline A venue Closure
Staff recommends that Hamline A venue be closed and removed between Ingerson Road and .-
Tiller Lane. The cost to reconstruct this segment of roadway would be much greater than the .
average for the neighborhood and may cause some encroachment into the adjacent wetland if
widened to 28-32 feet. Virtually no assessable properties lie on this segment of roadway raising
the city cost of the project. The traffic movements provided by the roadway could be replaced
by Dunlap Street and Pernwood Street. Traffic on those two streets will increase, the test
performed earlier this summer indicated an ADT increase on Dunlap Street from 100 to 300
however, an ADT of 300 is still considered typical for a residential type street. A moderate
speed increase was also measured during the test apparently as a result of the closure however
speeds generally stayed below 30 mph. The project would include reconstructed curves and
landscaping as necessary at the Harnline A venue and Ingerson Road intersection and at the Tiller
Lane and Cannon A venue intersection to present a smooth, finished design and not have the
closure appear as an afterthought.
A pedestrian/bicycle trail should be included between Ingerson Road and Tiller Lane in the
general area of Hamline A venue however the trail could meander to highlight any regrading,
ponding or stream construction which may occur in the area.
Water Quality Improvements
A. Pemwood Channel
Staff recommends that some permanent ponding be created in the Pemwood Channel in order to
improve the water quality of runoff entering Lake Josephine. The existing picnic area on the
west side of the channel should essentially remain intact. Some of the edges of the channel
should be extended to the east in a serpentine nature to create the additional volume. A weir
.
."
\
e
e
e
should be installed as close to Lake Josephine as possible to retain the maximum amount of
runnoff (thereby increasing water quality). A pedestrian crossing should be incorporated into the
channel improvements connecting Femwood Court and Ingerson Court (this could be
incorporated into a weir, bridge or culvert crossing. Landscaping should be included with the
channel improvements including trees, shrubs and natural grasseslflowers etc.
B. HamlinelTH 51 area
Staff recommends that some permanent ponding be created in this area in order to improve the
water quality of runoff generated from the Tiller Lane storm sewer system, TH 51 and the
western end of Ingerson Road. The ponding improvements should be in the form of expanded
channels with weirs to retain water (in lieu of one large pond) prior to releasing it from the
neighborhood. The channels should be regraded to look as natural as possible. A significant
portion of this area is privately owned and would not be available for ponding unless the City
acquires drainage easement rights or fee title to the property. The existing wetland between Tiller
Lane and Ingerson Road could be modified to include a small peninsula on the west side to
create better circulation of runoff through the wetland. A pedestrian/bike trail should be included
in this area to connect Ingerson Road and Tiller Lane. Landscaping should be included to give
the area a more natural look. Removal of existing trees should be minimized in the area and the
existing screening effect of the trees along Hamline A venue should be maintained and enhanced
where possible.
C. Rain Gardens
During the course of the task force meetings, the feasibility of incorporating of rain gardens into
the project was investigated. Rain gardens are small depressions (planted with shrubs and
flowers etc.) adjacent to the roadway which are intended to capture runoff from very small areas
(typically a single lot and the adjacent street) and allow that runoff to seep into the ground in lieu
of collecting it in storm sewers. Rain gardens are excellent for enhancing water quality and
theoretically reduce the size of storm sewers and regional ponding in a given area. In order to be
most effective, the gardens should be constructed in several lots in a given area and best results
occur with granular subsoils which promotes a high amount of infiltration.
Three areas were identified within the project area as possible locations for rain gardens due to
the relatively flat terrain in these areas. The areas identified are Ingerson Road west of
Femwood Street, the low area of Carlton Drive (approximately 4 lots), and the stretch of
Hamline Avenue south ofIngerson Road (approximately 6 lots). Although these areas have been
identified based upon the flatness of the existing terrain a number of additional factors must be
considered before proceeding with rain gardens.
Resident Approval
Conflicts with driveways
Conflicts with water services
Conflicts with trees
Gardens should not span over property lines (two owners would need to approve)
Reduction of soil cover over watermain (requires insulation)
Reduction of soil cover over sanitary sewer (requires insulation)
Conflictslimpacts to underground utilities NSP, US West, Media One etc.
Acceptance of design by MnDOT State Aid
Cost of gardens
Based upon the above factors staff recommends that rain gardens be considered for further study
only along Hamline A venue south of Ingerson and the Carlton low point.
.
.
l
.
e
e
.
f
.
.
.
RUG-23-2000 07:58
612 373 6526 P.02/07
BRW
III B~W
Emi1!IiI A O.&.Mg;.:s. -MoonE GROUP OOMPANY
MEMORANDUM
BRW
TIu-eshcr Square
700 Third Street South
Minne<ij>Olis. MN 554]5
Phone: (612) 370-0700
Fax: (612) 370-1378
To;
Joe Lynch/Arden Hills
City Administrator
File:
37951-011-0lD1
From: Gregory S. Brown
Arden Hills City Engineer
Dale: August 22, 2000
Subject: Pay Estimate #3 (Final Payment)
1999 Sanitary Sewer Rehabilitation Program
Background
The City of Arden Hills awarded Lametti and Sons, Inc. of Hugo, Minnesota the 1999 Sanitary
Sewer Rehabilitation Project On November 8, 1999 for a total contract amount of $251,265.00.
Payment #1 for the sum of $120,478.05 was paid on April 10,2000. Payment #2 for the sum of
$59,371.73 was paid on May 8, 2000,
Project Status
Sanitary Sewer Rehabilitation
The Contractor has completed the sanitary sewer rehabilitation and site restoration.
Televising Sanitary Sewer
The Contractor has completed the sanitary sewer cleaning and televising.
Sa!! Pipe Repair
The Contractor has completed the sag pipe repair and site restoration.
RecommendatioDs
The Arden Hills City Engineer recommends the Council approve Pay Estimate #3 (Final
Payment) in the amount of $37,815.78 to Lamelli and Sons, Inc. No retain age is being held for
the project.
Cc; Mark Lynch/BRW
Dwayne Stafford/Ardcn Hills
.
.
.
AUG-23-2000 07:58
BRW
APPLICATION FOR PAYMENT
FINAL PAYMENT
NO. 3
project
1999 SANITARY
CITY OF ARDEN
Owner CITY OF ARDEN
Owner's Project No.
Contractor LAMETTI & SONS,
Application Date 8/28/00
SEWER
HILLS
HILLS
REHABILITATION
612 373 6526 P.03/07
INC.
Engineer'S File No. 37951-011-0101
For Period Ending
8/18/00
------------~-------~---------~~-------------~------~---------------
----------------------~--------~-------~----------------------------
STATEMENT OF WORK
Original Contract Amount
Net Change By Contract Amendment
Contract Amount to Date
Total Amount of Work Completed to Date
Material Suitably Stored on Site but not
Incorporated into Work
Gross Amount Due to Date
Less 0.00% Retainage
Amount Due to Date
Less Previous Payments
Payment Due this Application
$ 251,265.00
$ 0.00
$ 251,265.00
$ 217,665.56
$ 0.00
$ 217,665.56
$ 0.00
$ 217,665.56
$ 179,849.78
$ 37,815.78
.
.
.
RUG-23-2000 07:58
BRW
612 373 6526 P.04/07
I hereby certifY that all items and amounts shown are correct for the work completed to date,
Contractor
Lametti & Sons rnc
By
(Name and Title)
Date
The work on this project and the application for payment have been reviewed and the amount
shown is recommended for payment.
BRW, INe.
By
(Project Engineer)
APPROVEDFORPA~ENT
Owner
City of Arden Hills
By
(Name and Title)
Date
Date
RUG-23-2000 07:58
~ ERW File; 37951-011-DIOl
Seq. No/
MnDot No Item
BRW
APPLl:CATl:ON FOR PARTIAL .PAYMENT
1999 SANITARY SEWER REHABl:LITATION
CITY OF ARD~ Hl:LLS
Unit
Unit
price
Bid Schedule: A - SANITARY SEWER RSBABILITATION
1 MOBILIZATION
2021.501
2 SITE RESTORATION
2105.601
3 SEWER BYPASS
2503.601
4 MANHOLE SEAL, CHEMICAL
2503.602
5 MANHOLE SEAL MORTAR
2503.602
6 F & I MANHOLE STE~S
_.602
7 SEWER MAIN CLE~~ING
2503.603
8 TRENCHLESS PIPE LINING
2503.603 (12")
9 RECONSTRUCT MANHOLE
2506.602 INVERT
10 INSTALL 2-FOOT, 48"
2506.602 BARREL SECTION
11 LOCKING MANHOLE COVER
2506.602
12 MANHOLE MARKER POST
2564.532
LS
0100.00
LS
3000.00
LS
1500.00
GAL
50.00
GAL
50.00
EA
40.00
LF
6.00
LF
33.00
EA
2000.00
EA
800.00
EA
1000.00
EA
70.00
1
2021. 501
MOBILIZATION
Bid Schedule: B - T~L2VIS~ SANITARY SEWER
3000.00
2
_.603
TELEVISE SANITARY SEWER
(8"-18")
LS
LF
0.40
Contract
Quantity
1. 00
1.00
1. 00
200.00
100.00
65.00
2300.00
2300.00
1.00
2.00
1. 00
13.00
1. 00
49500.00
512 373 5525
Contract
Amount
6100.00
3000.00
1500.00
10000.00
5000.00
2600.00
13800.00
75900.00
2000.00
1600.00
1000.00
910.00
To Date
Quantity
1.00
1.00
1. 00
200.00
100.00
57.00
2262.00
~~62.00
1_00
2.00
1. 00
13.00
Subtotal: $
3000.00
19800.00
1.00
42961. 00
P.05/07
8/22/00
Page: 1
To Date
Amount.
6100.00
3000.00
1500.00
10000.00
5000.00
2280.00
13572.00
74646.00
2000.00
1600.00
1000.00
910.00
121,608.00
3000.00
17184.40
AUG-23-2000 07:58
~ BRW File: 37951-011-0101
Seq. No/
MnOot No Item
3 SANITARY SEWER CLEANING
2503.603 (811-1811)
Eid Schedule, ~ - SAG PIPE RBPA~R
1 MOSILIZATION
2021_ 501
2 REMOVE BITUMINOUS
2104.503 PAVEMENr
3
2104.501
REMOVE BITUMINOUS CURB
4
2104_501
REMOVE 8 II PVC
_.521
GRANULAR BORROW
6
2105.601
DEWATERING
7
2105.601
srTE RESTORATION
8 TRENCH EXCAVATION
2105.607
9 BITUMINOUS PATCH
2331.521
10 FURNrSH AND rNSTALL
2503,511 B" I'VC
11 SEWER BYPASS
2503.601
12 JOINT TEST (8" I'VC)
2503.602
13 JOINT SEAL (8" PVC)
2503_602
.
BRW
APPL~CATION FOR PART~AL PAYMENT
1999 SANITARY SEWER RBBABILITAT~ON
CITY OF ARDEN HILLS
Unit
Unit
Price
LF
0.60
LS
4000.00
SY
10.00
LF
4.00
loF
6.00
TON
6,00
LS
3500.00
LS
4500.00
LF
50.00
SY
35.00
LF
20.00
loS
2500.00
Ell.
95.00
GAL
7,00
Contract
Quantity
49500.00
1.00
113 . DO
70,00
355_00
100.00
1.00
l. 00
355.00
113.00
355.00
1.00
60.00
1S0_00
612 373 6526
Contract
Amount
29700.00
To Date
Quantity
43311.00
Subtotal: $
4000.00
1130.00
280.00
2130.00
600.00
3500.00
4500_00
17750.00
3955.00
7100.00
2500.00
5700_00
1050.00
1.00
68.00
39.00
84_00
25_00
l. 00
1_00
321.11
68.00
89,98
1. DO
64.00
0.00
P.06/07
8/22/00
Page: 2
To Date
Arnoun t
25986.60
46.171_00
4000.00
680.00
1.56 _ DO
504,00
1.50_00
3500.00
4500.00
16055.50
2380_00
1799.60
2500.00
60&0_00
0_00
AUG-23-2000 07:59
BRW
612 373 6526
P.07/07
APPLICATION FOR PARTIAL PAYMEN'J:
1999 SANITARY SEWER REHABILITATION
CITY 0<' AR.DllN lULLS
eBRW
File: 37951-011-0101
B/22/00
Page: 3
Seq. No/ Unit Contra.ct Contra.:::::t To Date To Date
MnDot No Item unit Price Quantity A.mount Quantity Amount
-------~ ------------------------ ------~ ~--------- --------- --~-------- --------- -----------
14 FURNISH AND INSTALL LF 82.00 50.00 4l00.00 52.03 4266.46
2504.602 16"!1 STEEL CASING
15 CONNECT TO EXISTING EA 750.00 2.00 1500.00 2.00 1500.00
2504.602
16 BITUMINOUS CURB LF 5.00 70.00 350.00 39.00 195.00
2535.50l
17 TRAFFIC CONTROL LS 1000.00 l. 00 1000.00 l. 00 1000.00
2563.604 (DETOUR ONLY)
18 BALE CHECK EA 3.00 10.00 30.00 0.00 0.00
2573.501
19 SILT FENCE LF 2.00 590.00 ll80.00 310.00 620.00
2573.502
.0 PIPE SHORING EA 1000.00 10.00 10000.00 0.00 0.00
0.000
2l PIPE SUPPORT LF 20.00 150.00 3000.00 0.00 0.00
0000.000
Subtotal, $ 49,886.56
Grand Total: $ 217,665.56
.
TOTAL P.07