Loading...
HomeMy WebLinkAbout86-040 STATE OF MINNESOTA COUNTY OF RAMSEY CITY OF ARDEN HILLS Resolution No. 86-40 RESOLUTION ESTABLISHING FEES FOR HEATING, VENTILATING, AIR CONDITIONING AND SHEET METAL WORK AND REPEALING RESOLUTION NO. 80-62 WHEREAS, the City Council of the City of Arden Hills has determined that permit fees shall be established by resolution adopted by the City Council, and . WHEREAS, the Finance Committee, after careful study, has recommended a change in the present fee schedule and change in percentage of fee to be retained by the City. NOW, THEREFORE, BE IT RESOLVED that effective September 1, 1986, the heating permit fees for installation, alteration or additions shall be as follows: $25.00 5.00 10.00 4.00 15.00 3.00 300.00 25.00 4.00 25.00 4.00 15.00 3.00 10.00 20.00 20.00 2.00 300.00 25.00 3.00 . 15.00 5.00 5.00 Minimum fee for permit. Each Gas Appliance (machine, device, heater, range, refrigerator, gas dryer, gas stove, gas hot water heater or other appliance requiring the use of manufactured gas or liquid petroleum gas. Gas piping - $500.00 valuation or less (repair or instal- lation). Each additional $500.00 cost of repair or installation. Gas Burners or Gas Burner Equipment, Oil and Wood Burn- ing Furnaces or Boilers First 100,000 BTU input or less. Each additional 100,000 input or fraction thereof. Maximum fee for each unit. Steam, Warm Air or Hot Water Heating System First 100,000 BTU input for construction or alteration of any warm air furnace duct work. Each additional 100,000 BTU input or fraction. First 100,000 BTU input per unit for installation or replacement of each steam or hot water system. Each additional 100,000 BTUs or fraction thereof. (240 x EDR = BTUs/hr.) Per unit on unit heaters, based on first 100,000 BTU input. Each additional 100,000 BTU input or fraction thereof. Incinerators Installation or repair of each domestic incinerator. Installation or repair of each commercial incinerator. Air Conditioning and Refrigeration Work First 5 tons on any air conditioning or refrigeration project (60,000 BTUs). Each additional ton or fraction thereof (12,000 BTUs). Maximum fee per unit. First 5 tons (60,000 BTUs) of cooling for duct work for air conditioning Each ton (12,000 BTUs) or fraction thereof over first 5 tons for duct work for air conditioning. Ventilating Systems First 2,000 CFM per unit. Each additional 1,000 CFM or fraction thereof per unit. Each bathroom exhaust fan in a multiple dwelling. NOW, THEREFORE, BE IT FURTHER RESOLVED that effective September I, 1986, the percentage of the permit fee to be retained by the City be changed to 25%. Passed by the Arden Hills Council this 11th day of August, 1986. f ~h../~-,--, ~t L. Woodburn Mayor ~ . ;t/z fJ)} I!l;,L Charlotte McNiesh Clerk-Administrator " ~- .~~-- ---- ",_..._~:::... '. ~-'-----