Extract of Minutes of Meeting
of City Council
City of Arden Hills
Ramsey County, Minnesota
March 31, 1986
Pursuant to due call and notice thereof the City Council
of the City of Arden Hills met in regular session at the City
Hall on Monday, March 31, 1986 at 7:30 o'clock p.m.
The following members were present:
Mayor Woodburn and
Council members Sather, Peck, Hansen and Hicks; and the following
were absent: None.
Also present were City Engineers Christoffersen and
Liebenow, Prosecuting Attorney Filla, Treasurer Lamb, Public
Works Supervisor Raddatz, Clerk-Administrator McNiesh, and Deputy
Clerk Zehm.
City Engineer Christoffersen referred the Council to the
feasibility report, dated January 10, 1986, which had been
prepared by Short-Elliott-Hendrickson.
He advised the Council
that he estimated that if the City were to construct a 1 million
gallon tank the cost would be $950,000.00 and if it were to
construct a
l!.o million gallon tank the cost would be
$l,lOO,OOO.OO.
Council member Hicks moved, and Council member Hansen
seconded, that the Council adopt Resolution No. 86-l6, RESOLUTION
. ORDERING PLANS AND SPECIFICATIONS FOR WATER TOWER, which is set
forth hereinbelow.
In the discussion that ensued, the Council talked about
al ternatives to constructing another water tower in the City.
.
.
Council member Sather asked about the feasibility of a pipe
connection to Shoreview at County Road E as an alternative to the
water tower. Engineer Liebenow explained that the Shoreview
water connection would not take the place of the proposed tower
noting that at an approximate cost of $300,000.00 per well it
would not make economic sense to make this connection. He
pointed out to the Council that the City would have to buy into
the Shoreview well system and that in order to achieve a rate of
3,000 gallons of water per minute, the City would need three
wells plus a back-up well for its water needs.
Engineer Liebenow explained to the Council that the City's
water system was originally designed for two towers back in the
1960' s. Upon being queried, he advised that the majority of
water consumption--on peak days--is in the southern part of the
City.
Council member Hansen compared Shoreview water ("hard")
with the City's water ("soft"). She felt that any possible water
connection to Shoreview would be for emergency water only;
Shoreview would not be a general water source.
Thomas Mulcahy, a former Council member, admonished the
Council to analyze the need for another water tower before
deciding to construct one. He felt that the City should obtain a
second engineer's opinion and explore alternate ways to store
water. He pointed out that the Roseville-Arden Hills water
contract permits the purchase by the City of water from others.
He expressed his concern about the City's spending a large amount
of money for a water tower without adequate data.
- 2 -
.
.
Council member Hansen inquired as to the average water
consumption per person in the City noting that out of approxi-
mately 2,300 homes in the City 500 of them are not using
municipal water. Engineer Liebenow responded that approximately
60 to 80 gallons per day per person were consumed by citizens of
the City. Lawn sprinklers use an additional five gallons per
minute adding about 2,500 gallons per minute load on the City's
water system. He noted that if 80% of the homes sprinkled lawns
the water consumption rate would be 2,000 gallons per minute
which is equal to two additional wells. He advised the Council
that if a fire were to occur during peak water usage, an
insufficient amount of water and/or water pressure could result
in a building burning down. He noted that July and August are
"worry months".
Engineer Liebenow opined that most cities of any
appreciable size have two water towers for maintenance purposes
as well as to even water pressure. He explained that water
pressure, depending upon the size of mains, can vary in various
areas of the City and that by equalizing the pressure, mains can
be kept smaller.
Council member Hicks inquired about the City's liability
if sufficient water pressure is not provided. Engineer Liebenow,
in response to this question, was unaware of the City's liability
but advised the Council that an insurance company might not
insure a building unless adequate water pressure were provided.
Council member Hansen reported that insurance rates are
dependent upon response time and water availability. Council
- 3 -
member Hicks asked if a well, at an estimated cost of
.
$300,000.00, would meet the City's water needs.
Engineer
Liebenow advised that two wells would be necessary to provide the
needed l,OOO to l,200 gallons per minute rate.
Council member Sather took exception to the Shoreview
"hard" water vs. the City's "soft" water comparison made by
Council member Hansen. He said he still needs a water softener
to soften the City's water.
Council member Sather then asked Engineer Liebenow about
backflow to Roseville if the valve should inadvertently not be
closed.
Engineer Liebenow said that this would not occur.
He
advised that the water tank would be full at all times except
during peak water usage. The discussion thereupon concluded.
The Resolution, the adoption of which had been earlier
moved and seconded by Council members Hicks and Hansen, was
entitled and read as follows:
RESOLUTION No. 86-l6
RESOLUTION ORDERING PREPARATION OF
PLANS AND SPECIFICATIONS FOR
1 MILLION GALLON WATER TANK AND
ALTERNATE OF ll:> MILLION GALLON WATER TANK
WHEREAS, pursuant to request of the City Council the City
Engineer has prepared a preliminary feasibility report and cost
estimate (the "Feasibility Report"), dated January lO, 1986, as
. to the City's construction of a 1 million gallon water tower or,
in the alternative, a ll:> million gallon water tower (the "Water
Tower"), and
- 4 -
.
.
WHEREAS, the City Council has accepted and approves the
findings, conclusions and recommendations of the City Engineer
contained in the Feasibility Report and thus deems the construc-
tion of the Water Tower to be necessary and in the public
interest,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ARDEN HILLS, MINNESOTA THAT the Water Tower be
constructed and the City Engineer be authorized and directed to
prepare and to submit to the City Council in the reasonably near
future final plans and specifications for the Water Tower which
shall include, as alternatives, the construction of a 1 million
gallon water tower and a ll:> million gallon water tower.
Upon vote being taken on the motion for adoption made by
Council member Hicks and seconded by Council member Hansen, the
following voted in favor thereof: Mayor Woodburn and Council
members Hicks and Hansen; and the following voted against the
same: Council members Sather and Peck; whereupon said Resolution
was declared duly passed and adopted.
- 5 -
.
.
STATE OF MINNESOTA )
) ss.
COUNTY OF RAMSEY )
I, the undersigned, being the duly qualified and acting
Clerk-Administrator of the City of Arden Hills, Ramsey County,
Minnesota, do hereby certify that I have carefully compared the
attached and foregoing extract of minutes of a meeting of the
City Council of said City held on the date therein indicated with
the original of said minutes on file in my office and that said
extract is a full, true and correct transcript of said minutes,
insofar as they relate to the proposed construction of a 1 or ll:>
million gallon water tower pursuant to the City Engineer's
Feasibility Report.
WITNESS
corporate seal
1986.
MY HAND as sa4/o~rk-Admin~
of the City this day of
and
the
,
[SEAL]
~ 6?eCiJl! ~-dL
Clerk-A~m~nistrator
- 6 -