Extract of Minutes of Meeting
of City Council
City of Arden Hills
Ramsey County, Minnesota
April 29, 1985
Pursuant to due call and notice thereof, a regular meeting
of the City Council of the City of Arden Hills, Minnesota, was
duly held at the City Hall in said City on Monday, April 29,
1985, at 7:30 o'clock p.m.
The following members of the Council were present: Mayor
Woodburn and Council members Sather, Peck and Hansenl and the
following were absent: Councilman Hicks.
Also in attendance were Clerk-Administrator McNiesh,
Deputy Clerk Zehm, Engineer Christoffersen, Treasurer Lamb,
Public Works Supervisor Raddatz, and Parks Director Buckley.
Engineer Christoffersen described the two alternatives
(surcharge method and replacement method) available to the City
in preparing the low areas of Hamline Avenue for future
construction on Hamline Avenue between State Trunk Highway No. 96
and Floral Drive and recommended that the surcharge method be
used.
He described the surcharge technique in detail.
He
explained that it would cause some settlement which might cause
damage to the street surfacing and concrete curb and gutter, any
of which damage he expected to be minor, and stated that the
surcharging would cost less than completely removing the swamp
material.
He said that the telephone, electric and cable companies
would be notified of the surcharging so that they could protect
,
their facilities in the right-of-way. He added that he did not
believe that the City's sewer and water lines in the right-of-way
... would be affected by this improvement because they were embedded
in good material.
Lastly, Engineer Christoffersen said that it was possible
that the surcharging improvement could be done by the contractor
hired by the State of Minnesota at the time the contractor does
the 694/Hamline improvement the State is contemplating under some
type of cooperative agreement but that if the State's contractor
did the job, up front money would be required from the City by
the State.
After some discussion, Councilman Sather introduced and
moved the adoption of the following resolution:
RESOLUTION NO. 85-18
RESOLUTION RECEIVING FEASIBILITY REPORT AND ORDERING
PREPARATION OF PLANS AND SPECIFICATIONS FOR AND
CONSTRUCTION OF HAMLINE AVENUE IMPROVEMENT 85-l,
PHASE I (SURCHARGING HAMLINE AVENUE BETWEEN
FLORAL DRIVE AND STATE TRUNK HIGHWAY NO. 96)
WHEREAS, by motion adopted on March 25, 1985, the Council
of the City directed the City Engineer to prepare a preliminary
report as to the feasibility (the "Feasibility Report") of the
City's filling the low areas of Hamline Avenue between State
Trunk Highway No. 96 and Floral Drive to prepare that segment for
Phase II of the Hamline Avenue Improvement Project, this filling
... to be accomplished as part of the City's Hamline Avenue Improve-
ment 85-l, Phase I (the "Improvement"), and to include in the
Feasibility Report for the Improvement the estimated cost thereof
and an indication as to whether the Improvement should best be
- 2 -
.
.
made as proposed or in connection with some other improvements,
and
WHEREAS, the Feasibility Report for the Improvement has
been submitted to and considered by the Council,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ARDEN HILLS, MINNESOTA THAT:
1. The Feasibility Report for the Improvement be
approved in the form submitted and be placed on
file in the office of the Clerk-Administrator
of the CitYl
2. The cost of the Improvement shall be paid from
M.S.A. funds and other sources of the CitYl and
3. The City Engineer be authorized and directed to
prepare and to submit to the City Council the
final plans and specifications for the Improve-
ment.
The motion for the adoption of the foregoing resolution
was duly seconded by Council member Hansen and, upon vote being
taken thereon, the following voted in favor thereof: All; and
the following voted against the same:
None 1 whereupon said
resolution was declared duly passed and adopted.
- 3 -
.
.
, ..t
whether the Improvement should best be made as proposed or in
connection with some other improvements, and
WHEREAS, the Feasibility Report for the Improvement has
been submitted to and considered by the Council,
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF ARDEN HILLS, MINNESOTA THAT:
1. The Feasibility Report for the Improvement be
approved in the form submitted and be placed on
file in the office of the Clerk-Administrator
of the CitY1
2. The cost of the Improvement shall be paid from
M.S.A. funds and other sources of the CitY1 and
3. The City Engineer be authorized and directed to
prepare and to submit to the City Council the
final plans and specifications for the Improve-
ment.
The motion for the adoption of the foregoing resolution
was duly seconded by Council member Hansen and, upon vote being
taken thereon, the following voted in favor thereof: All1 and
the following voted against the same:
None; whereupon said
resolution was declared duly passed and adopted.
- 3 -
"
. .
STATE OF MINNESOTA )
) ss.
COUNTY OF RAMSEY )
. I I the undersigned I being the duly qualified and acting
Clerk-Administrator of the City of Arden Hills, Minnesota, do
hereby certify that I have carefully compared the attached and
foregoing extract of minutes of a regular meeting of the City
Council of said City held on the 29th day of April, 1985 with the
original thereof on file in my office, and the same is a full,
true and complete transcript thereof insofar as the same relates
to the proposed Hamline Avenue Improvement 85-1, Phase I.
WITNESS MY
corporate seal of
1985.
HAND as said Cler~-Admini~tor ~d
the City this / /~day of '..1'/.,1'11. '..I
the
(SEAL]
r2h~/A2/l t#lf ~
Clerk-Administrator
.
- 4 -