RESOLUTION NO. 88-12
RESOLUTION ESTABLISHING FEES FOR ELECTRICAL PERMITS
AND RESCINDING RESOLUTION NO. 82-64
WHEREAS, Section 6-91 of the City Code provides that fees for
electrical permits be established by resolution adopted by the City Council,
and;
WHEREAS, Resolution No. 82-64 established electrical permit fees
effective 1/1/83,
NOW, THEREFORE, BE IT RESOLVED, that effective April 1, 1988, the
permit fees shall be as follows:
1. Minimum fee for each separate inspection of an installation,
replacement, alteration or repair limited to one inspection
only $15.00
2.
Services, changes of service, temporary services, additions,
alterations, or repairs on either primary or secondary
services shall be computed separately:
o to 100 ampere capacity
101 to and including 200 ampere capacity
For each additional 100 ampere capacity or fraction
thereof
18.00
22.00
.
10.00
3. Circuits, installations of, additions, alterations, or
repairs of each circuit or sub-feeder shall be computed
separately, including circuits fed from sub-feeders and
including the equipment served, except as provided for in
4 through 10:
o to and including 30 ampere capacity
(Maximum number of 0 to 30 ampere circuits to
be paid on is 30 to anyone cabinet)
31 to and including 100 ampere capacity
For each additional 100 ampere capacity or fraction
thereof
5.00
7.00
4.00
4. Maximum fee on a single family dwelling shall not exceed $75.00 if not
over 200 ampere capacity. This includes service, feeders, circuits,
fixtures and equipment. The maximum fee provides for not more than two
rough-in inspections and the final inspection per dwelling. Additional
inspections at the re-inspection rate.
.
5. Maximum fee on an apartment building shall not exceed $35.00 per dwelling
unit for the first 20 units and $30.00 per dwelling unit for the balance
of the units. A two-unit
dwelling, (duplex) maximum fee per unit as per single family dwelling.
.
6. The maximum number of 0 to 30 ampere circuits to be paid on anyone
athletic field lighting standard is ten.
7. In addition to the above fees:
A. A charge of $2.00 will be made for each street lighting standard.
B.
A charge of $3.00 will
Circuits originating
computing fees.
be made for each traffic signal standard.
within the standard will not be used when
8.
In addition
heat, and
cents per
per KVA.
category is
to the above fees, all transformers and generators for light,
power shall be computed separately at $6.00 per unit plus 30
KVA up to and including 100 KVA. 101 KVA and over at 25 cents
The maximum fee for any transformer or generator in this
$60.00.
9.
In addition to the above
lighting shall be computed
thereof per unit, plus 50
thereof.
fees, all
at $5.00
cents for
transformers for signs
for the first 500 VA
each additional 100 VA
and outline
or fraction
or fraction
.
10. In addition to the above fees, unless included in the maximum fee filed by
the initial installer, remote control, signal circuits, and circuits of
less than 30 volts shall be computed at $4.00 per each ten openings or
devices of each system plus $2.00 for each additional ten or fraction
thereof.
11. In addition to the above fees, the inspection fee for each separate
inspection of a swimming pool shall be computed at $20.00, reinforcing
steel for swimming pools requires a rough-in inspection.
12. For the review of plans and specifications of proposed installations,
there shall be a m~n~mum fee of $125.00 up to and including $30,000 of
electrical estimate, plus 1/10 of 17. of any amount in excess of $30,000 to
be paid by persons or firms requesting the review.
13. When reinspect ion is necessary to determine whether unsafe conditions have
been corrected and such conditions are not subject of an appeal pending
before any court, a reinspect ion fee of $15.00 may be assessed in writing
by the inspector.
14. For inspections not covered herein, or for requested special inspections
or services, the fee shall be $20.00 per man hour, including travel time,
plus 21 cents per mile traveled, plus the reasonable cost of equipment or
material consumed. This section is also applicable to inspection of empty
conduits and such jobs as determined by the City.
15. For inspection of transient projects, including but not limited to,
carnivals and circuses, the inspections fees shall be computed as follows:
.
Power
will
supply units according to item (2) of fee schedule. A like fee
be required on power supply units at each engagement during the
.
season, except that a fee of $20.00 per hour will be charged for
additional time spent by the inspector, if the power supply is not
ready for inspection as required by law.
Rides, Devices or
appearance of the
unit.
Concessions: shall be inspected at their first
season and the inspection fee shall be $15.00 per
Adopted by the Arden Hills City Council this 14th day of March, 1988.