HomeMy WebLinkAbout95-024
.
-
.
.
CITY OF ARDEN HILLS
RAMSEY COUNTY
RESOLUTION NO. 95-24
RESOLUTION TRANSFERRING JURISDICTION OVER STOWE AVENUE
TO THE CITY OF ARDEN HILLS
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
WHEREAS,
The 1991 Minnesota Legislature established a Ramsey County Local
Government Services Study Conunission to "report on the advantages and
disadvantages of sharing, cooperating, reconstructuring, or
consolidating..." activities in areas of public service including public
works; and
The consolidation plan provides for reclassification of roadways and
corresponding changes in jurisdiction including the transfer of local and
State Aid roadways between the County and municipalities; and
Stowe Avenue (County Road 163) from New Brighton Road to Lake
Johanna Boulevard located in the City of Arden Hills, is presently under
the jurisdiction of Ramsey County as a County Road; and
This roadway segment has been determined to serve a local function only;
and
Revocation of "County Road" status may be accomplished by resolution
of the Ramsey County Board of Conunissioners pursuant to Minnesota
Laws 163.11; and
The City of Arden Hills has concurred that jurisdiction should be changed
from Ramsey County to the City of Arden Hills; and
The consolidation plan stipulates that Ramsey County shall improve the
roadways to acceptable levels prior to transferring jurisdiction over
roadway segments from Ramsey County to municipalities, and the
Ramsey County Capital rmprovement Program provides funding for these
improvements; and
The City of Arden Hills desires to reconstruct this segment of Stowe
A venue for an estimated cost of $240,000 and fund the reconstruction
project with Municipal State Aid Street sources, and an estimated
$100,000 from the Ramsey County Roadway Consolidation Fund;
,
. NOW, THEREFORE, BE IT RESOLVED, By the City Council of the City of Arden Hills,
Minnesota:
1. The City of Arden Hills does hereby concur with Ramsey County revoking the
"County Road" status of Stowe Avenue between New Brighton Road and Lake
Johanna Boulevard, and transferring jurisdiction over the roadway to the City if
Arden Hills;
2. That the revocation of Stowe A venue will be effective the first day of the second
month following the date the County is in receipt of an adopted resolution from
the City of Arden Hills concurring with the County revoking the "County Road"
status of Stowe A venue between New Brighton Road and Lake Johanna
Boulevard and transferring jurisdiction over the roadway to the City of Arden
Hills;
3. That the County will pay to the City as just compensation for this jurisdiction
transfer, an estimated $100,000 (the total compensation is calculated from the
"County Road" reconstruction Cost Participation Policy, Resolution 9-1272, and
adjusted by Pavement Management System [(90 - Condition Rating)lCondition
Rating] * 1993 Condition Rating);
.
4.
That Ramsey County will reimburse the City of Arden Hills an estimated
$100,000 upon presentation of billings from the construction contractor for
reconstruction of this segment of Stowe Avenue;
5. The Arden Hills Engineer is authorized within the limits of this resolution to take
actions necessary to have the identified jurisdiction change executed.
PASSED AND ADOPTED BY THE CITY COU
THIS DAY OF 27TH DAY OF MARCH, 19
ITY OF ARDEN HILLS
DE
ATTEST:
.
~~IS~
I .
('OISlLTING IlIGlNEERS
1326 Energy Perk Drive
SI, Peul, MN 55108
611-644.4389
1,800,888.1923
Fex: 612-644-9446
CIVIL ENGiNEERING-_
.V1RONMENTAl
, NICIPAl
PlANNING
SCUD WASTE
STRUCTURAL
SURVEYING
TRAFFIC
TRANSPORTATION
ElECTRICAUMECHANICAL
ENGINEERING:
HVA(
POWER DISTRIBUTION
SCADA
SYSTEM CONTROlS
eFICESIN:
MINNEAPOLIS
PRIOR LAKE
S1. PAUL
W ASECA
March 17, 1995
File: 520-055-10
~v1pJ~. _21 19'01:,
- v
-UJ t
;",.r;:} ,: (; :-; ~ ~_ L:'
Mr. Brian Fritsinger
City of Arden Hills
1450 West Highway 96
Arden Hills, MN 55112
RE: MUNICIPAL ST ATE AID AND
RAMSEY COUNTY TURNBACK ISSUES
Dear Mr. Fritsinger:
This letter was prepared to address several issues concerning the referenced subjects. The
first of which is the turnback of Stowe A venue. As noted at Monday night's City Council
meeting, I met with Mr. Tim Mayasich of Ramsey County Public Works on Tuesday,
March 14, 1995. As a result of that meeting, the enclosed sample resolution is submitted
for your consideration. As indicated in the feasibility study for the reconstruction of Stowe
Avenue, Ramsey County has proposed to use Option #2 for the turnback, resulting in the
anticipated 100% funding of County eligible funds for that portion of the project. That
amount is estimated at approximately $100,000, but may vary slightly based upon bids
received and actual construction costs. More importantly, the project can proceed this
summer as outlined in that report.
The second issue is the County's desire to have maintenance and construction responsibility
for Hamline Avenue from Floral Drive to T.H. 96, and West County Road F from
Harnline Avenue to Lexington Avenue, turned back to the County from the City of Arden
Hills. As it has been proposed to seal coat Hamline A venue, we recommend deleting that
portion of the 1995 Street Maintenance project at a potential savings to the City of
approximatley $22,000 to $25,000.
Finally, upon resolution of these issues, we need to finalize the designation of Municipal
State Aid Streets for the City by May 1, 1995. This is typically required prior to March 1;
however, the County has provided the MnDOT State Aid office with a list of all proposed
turnbacks in the County to delay that reporting date until May 1.
.
Mr. Brian Fritsinger
March 16, 1995
Page Two
We hope this letter adequately addresses your requirements regarding this issue. Please
contact our office if you have further questions or require additional information.
Sincerely,
MSA, CONSULTING ENGINEERS
()