Loading...
HomeMy WebLinkAboutCCP 01-21-2003 May...: . ~ApJIkowsId C,..u Members: David Grant '... Bolden GfC!PLarson Leis Rem .~ ~H1LLS Arden Bills City-CouneB" WORK SESSION 4:45 p.m. Tuesday~Januarv 21..2003 Agenda (]'he times may vary depending upon lengtkof di$CU93{onJ t.CaD loOnier DEPARTMENT 1. COMMUNITY SERVICES A. Guidant - Final AUAR and . MitigatioB Plan B. Ramsey County Pm Master Plan Amendment C. Letter to the GSA STAFF Aaron Parrish Aaron Parrish Aaron Parrish 3. OPERATIONS &: MAINTENANCE A. Ramsey County Public W"Olb Facility Cost Comparison 1. Capital and Design Costs (Memo Forthcoming) 1. Planning Review B. Karth Lake Water Level RepOrt 4. ADMINISTRATION A. 2003 Retreat (Updates) B. Lake Josephine Lake Association (2003 PMPllngerson) CITY COUNCIL REPORTS A. Council Member Grant B. Council Member Holdea C. Council Member Larson Joe Lynch Greg Brown Joe Lynch Joe Lynch File Copy ~ 'f .......(. ." "1~~11O 11MB 4:45 .1;~ _.....oIiC1k:..:.i....~::~."-.. ;. / Arden Hills City Council WORK SESSION Agenda January 17, 2003 Pa 2 D. Council Member Rem E. Mayor Aplikowski e . . ~ ~~HILLS MEMORANDUM DATE: 2.A January 16, 2003 Agenda Item TO: Mayor Beverly Aplikowski Council Member David Grant Council Member Brenda Holden Council Member Gregg Larson Council Member Lois Rem Joe Lynch, City Administrator jt! MOM: Aaron Parrish - Community Services Director SUBJECT: Guidant Final Alternative Urban Areawide Review and Mitigation Plan ENCLOSURES: I. Guidant Campus Master Plan Final Alternative Urban Areawide Review and Mitigation Plan for City Council Approval Overview BaSed on information submitted during the public comment period for the Alternative Urban Areawide Review (AUAR), SRF Consulting has prepared the final AUAR document for the Council's review and comment. While much of the AUAR document remains unchanged from when the Council approved the public comment draft of the AUAR, this version includes the following notable additions: 1. Appendix D: Draft AUAR Comments and Responses- This section outlines and provides responses to comments received during the public comment period. Once Council is comfortable with the responses, staff will forward them along to the respective individuals and agencies. 2. Appendix E: AUAR Mitigation Plan- This section, a key element of the AUAR process and document, outlines how any identified environmental impacts will be mitigated and who will be responsible for the mitigation. Page 2 January 16, 2003 Memo to Mayor and City Council The following represents the remaining schedule and process: · SRF Distributes Draft Mitigation Plan to Mn/DOT, City of Shoreview, Ramsey County and Met Council . City Council Work Session to discuss/review Final AUAR and Mitigation Plan · City Council considers approval of Final AUAR and Mitigation Plan for distribution · Submit Final AUARlMitigation Plan to EQB Monitor and distribute document to EQB List and Draft AUAR commentors . Objection period ends . City considers adoption of Final AUAR/Mitigation Plan(l) · Submit City's approval of Final AUAR/Mitigation Plan to EQB Monitor for publication on Feb. 18 (1) Assumes no objections to final AUARlMitigation Plan are filed by government agencies_ Complete 1/21/03 1/27/03 1/27/03 2/10/03 2/10/03 2/11/03 A representative of SRF, tbe consulting team preparing the AUAR, will be available to answer any questions that the Council might have. Requested Action Provide comment on the AUAR, responses to comments, and mitigation plan. . . . I Ie I I I I I I I II I I I I I I .. I I GUIDANT CAMPUS MASTER PLAN FINAL ALTERNATIVE URBAN AREAWIDE REVIEW (AUAR) and MITIGATION PLAN FOR CITY COUNCIL APPROVAL January 2003 Prepared for: City of Arden Hills Prepared by: SRF Consulting Group, Inc. SRF No. 0024547 I I. I I I I I I I .- I I I I I I I. I , TABLE OF CONTENTS Page Introduction........................... ........ ........ ............. ................... ............................................... .........1 1. Project Title................................................................................................................... 2 2. Proposer....... .................................................... .................... .................. ....................... 2 3. RGU .............................................................. ............................................................... 2 4. Reason for EA W Preparation ....................................................................................... 2 5. Project Location ........................................................................................................... 2 6. Description ...................... ........ .................................................................... ................. 3 7. Project Magnitude Data ............................................................................................... 6 8. Permits and Approvals Required ................................................................................. 8 9. Land Use ...................................................................................................................... 9 10. Cover Types ................................................................................................................. 12 l1. Fish, Wildlife, and Ecology Sensitive Resources ........................................................ 13 12. Physical Impacts on Water Resources ......................................................................... 15 13. Water Use ..................................................................................................................... 17 14. Water-Related Land Use Management Districts .......................................................... 18 15. Water Surface Use ....................................................................................................... 19 16. Erosion and Sedimentation .......................................................................................... 19 17. Water Quality- Surface Water Runoff ........................................................................ 20 18. Water Quality - Wastewater ........................................................................................ 24 19. Geologic Hazards and Soil Conditions ........................................................................ 25 20. Solid Wastes; Hazardous Wastes; Storage Tanks ........................................_............... 27 21. Traffic.. ..... ............ ..... .................... ....... ............. .........._.................. .......... ................... 28 22. Vehicle-Related Air Emissions .................................................................................... 41 23. Stationary Source Air Emissions ................................................................................. 44 24. Dust, Odors and Noise ................................................................................................. 44 25. Sensitive Resources .................... .................... ...... ....................... ............... ................. 52 26. Visual Impacts .............................................................................................................. 54 27. Compatibility with Plans ....................................................._........................................ 55 28. Impact on Infrastructure and Public Services .............................................................. 56 29. Cumulative lmpacts ..................................................................................................... 57 30. Other Potential Environmental Impacts ....................................................................... 57 31_ Summary of Issues ..................................._................................._................................. 57 APPENDICES: Appendix A: Fib'1lres Appendix B: City Council Resolution Ordering the AUAR Appendix C: COlTespondence Appendix D: Draft AUAR Comments and Responses Appcndix E: Final AUAR Mitigation Plan J-/:\Planning'14547'IRepor/',FinaJ AUARWina! ALlAR OI1403_dor: -j- I '. I I I I I .1 I II I I I I I I I . I I LIST OF TABLES Page _ Staging Intensity of the Proposed Development ................................................. 5 _ Building and Parking Ramp Heights (Existing and proposed)............................ 7 _ Required Permits and Approvals ........................................................................ 9 _ Existing and Proposed Cover Types ................................................................... 12 _ Wetland Summary ...............................................................................................16 _ Existing and Proposed Impervious Surface and Proposed Treatment Strategy .. 23 _ Existing A.M. and P.M. Peak Hour Capacity Analysis LOS Results - Signalized Intersections .. ...................................................... .............................. 31 Table 8 _ Existing A.M. and P.M. Peak Hour Capacity Analysis LOS Results- Unsignalized Intersections .......... ............................................................. ........... 32 Table 9 _ Future No-Build A.M. and P.M. Peak Hour Capacity Analysis LOS Results- Signalized Intersections .... .......................................................................... ........ 33 Table 10 _ Future No-Build A.M. and P.M. Peak Hour Capacity Analysis LOS Results- Unsignalized Intersections ......... .................. ....... ..... ........... ............... ................. 34 Table 11 _ Future Build A.M. and P.M. Peak Hour Capacity Analysis LOS Results- Signalized Intersections .... ...... ....... ...... ............ ...... ..... ........... ............... ...... ........36 Table 12 _ Fuhlre Build A.M. and P.M. Pcak Hour Capacity Analysis LOS Results- Unsignalized Intersections ... ...... ........ ..... ............ ................ ...... ..... .......... ........... 37 Table 13 _ Future 2005 A.M. and P.M. Peak Hour Capacity Analysis LOS Results- Signalized Intersections .... ....... ....... ...... .................. .......... ...... ..... ................ ....... 3 8 Table 14 _ Fuhlre 2005 AM. and P.M. Peak Hour Capacity Analysis LOS Results- Unsignalized Intersections ... ....... ....... ..... ....... ........... ..... ...... ...... ......... ...... .......... 38 Table 15 _ Future 2020 A.M. and P.M. Peak Hour Capacity Analysis LOS Results- Signalized Intersections .... ....... ............. ....................... ...... ............... ..... ....... ...... 39 Table 16 _ Future 2020 AM. and P.M. Peak Hour Capacity Analysis LOS Results - Unsignalized Intersections .......... ............. ...... ....... .......... ...... ..... ..... .......... .......... 39 Table 17 _ Carbon Monoxide Modeling Assumptions .........................................................42 Table 18 _ Calculation of CO Background Concentrations .................................................. 43 Table 19 _ Carbon Monoxide Modeling Results - 2020 AM. .............................................45 Table 20 _ Carbon Monoxide Modeling Results - 2020 P.M. .............................................46 Tablc 21 _ Typical Construction Equipment Noise Levels at 50 Feet ..................................48 Table 22 _ Minnesota State Noise Standards ........................................................................49 Table 23 _ Noise Monitoring and Modeling Results - Daytime ..........................................51 Table 24 _ Noise Monitoring Rcsults - Nighttime ............................................................... 51 Table 1 Table 2 Table 3 Table 4 Table 5 Table 6 Table 7 -ii- I -. I I I I I I I .- I I I I I I I. I I INTRODUCTION This Alternative Urban Areawide Review (AUAR) was completed by the Guidant Corporation to provide environmental planning and documentation for further development of the Guidant Campus in Arden Hills. As provided for in Minnesota Rules Chapter 4410.3610, Subpart I, this AUAR substitutes for preparation of an Environmental Assessment Worksheet (EAW) or Environmental Impact Statement (EIS) for future developments in the study area, provided they are consistent with the assumptions of the AUAR. The land uses described in the proposed development are consistent with those designated by the City's land use plans and zoning identified in thc 1998 City of Arden Hills Comprehensive Plan. (Note: Since the Draft AUAR was distributed, the City's 1998 Comprehensive Plan was approved by the Metropolitan Council.) THIS ENVIRONMENTAL REVIEW WAS PERFORMED IN ACCORDANCE WITH THE MINNESOTA ENVIRONMENTAL QUALITY BOARD (EQB) ENVIRONMENTAL REVIEW PROGRAM, MINNESOTA RULES 4410.3610, AND THE EQB MEMORANDUM, "RECOMMENDED CONTENT AND FORMAT: ALTERNATIVE URBAN AREAWIDE REVIEW DOCUMENTS," DATED OCTOBER 2000. IN ACCORDANCE WITH THIS GUIDANCE, THE STANDARD EAW FORM HAS BEEN USED TO COMPLETE THIS REVIEW. FOR EACH ITEM DISCUSSED BELOW, A NOTE HAS BEEN INCLUDED IN ITALICS INDICATING EITHER THE EQB'S RECOMMENDATION OF INFORMATION NEEDED FOR THE AUAR (WHERE IT DIFFERS FROM THAT NEEDED FOR THE EAW) OR THAT THE EA W ITEM IS NOT APPLICABLE TO THE AUAR. NOTE TO REVIEWERS: The Draft AUAR was distributed for public review on October 14, 2002 to the required Environmental Quality Board (EQB) Distribution list. The public revicw and comment period cnded on November 13, 2002. Comments received on the Draft AUAR have been addressed in this Final AUAR and Mitigation Plan, including an appendix (see Appendix D) specifically responding to each timely, substantive comment received. The Final AUAR and Mitigation Plan have been distributed to all Draft A UAR recipients and commentors as required by state regulations. Guidant Campus Master Plan Final AUAR and Mitigation Plan -1- January 2003 I I. I I I I I I I ~ I I I I I I I. I I 1. PROJECT TITLE: Guidant Campus Master Plan 2. PROPOSER: CONTACT PERSON: TITLE: ADDRESS: Guidant Corporation Mr. Dave Reimer Director of Facilities 4100 Hamline Avenue North Arden Hills, MN 55112 6511634-5125 PHONE: 3. RGU: CONTACT PERSON: TITLE: ADDRESS: City of Arden Hills Mr. Aaron Parrish Community Services Director 1245 West Highway 96 Arden Hills, MN 55112-5794 6511634-5125 aaron. parrish@ci.arden-hills.mn.us PHONE: EMAIL: 4. REASON FOR EAW PREPARATION: Not applicable to AUAR. 5. PROJECT LOCATION SECTIONS .1L COUNTY CITY/TOWNSHIP TOWNSHIP 30N Ramsey City of Arden Hills RANGE 23W EAW: A. A COUNTY MAP SHOWING THE GENERAL LOCATION OF THE PROJECT. The county map is not needed for an A UAR. B. COPY(IES) OF USGS 7.5 MINUTE, 1:24,000 SCALE MAP INDICATING THE PROJECT BOUNDARIES. C. A SITE PLAN SHOWING ALL SIGNIFICANT PROJECT AND NATURAL FEATURES. AUAR: Instead of a site plan, include: (I) a map clearly depicting the boundaries of the AUAR and any subdistricts used in the A UA R analysis; (2) land use and planning and zoning maps as required in conjunction with Items 9 and 27; and (3) a cover type map as required by Item 10. Additional maps may be included throughout the document wherever maps are useful for displaying relevant information. Guidant Campus Master Plan Final AUAR and 1....1itigation Plan - 2- January 2003 I I. I I I I I I I se I I I I I I I. I I The required graphics are provided in Appendix A: . Figure I Project Location-Local Area . Figure 2 AUAR Boundary . Figure 3 Existing Site Plan . Figure 4 Proposed Site Plan . Figure 5 Existing Land Uses (1998 Adopted Comprehensive Plan) . Figure 6 Planned Land Uses (1998 Adopted Comprehensive Plan) . Figure 7 Zoning Map (1998 Adopted Comprehensive Plan) . Figure 8 Existing Cover Types . Figure 9 Proposed Cover Types 6. DESCRIPTION AUAR: Instead of the information called for on the EA W Form, the description section of an A UAR should include the following elements for each major development scenario: . anticipated types and intensity (density) of residential and commercial /warehousellimited industrial development throughout the A UAR area; . infrastructure planned to serve the development (roads, sewers, water, storm water system, etc.). Roadways intended primarily to serve the adjoining land uses within an AUAR area are normally expected to be reviewed as part of an AUAR. More "arterial" types of roadways that would cross an A UAR area are an optional inclusion in the A UAR analysis; if they are to be included, a more intensive level of review, generally including an analysis of alternative routes, is necessary; . information about the anticipated staging of various developments, to the extent known, and of the infrastructure, and how the infrastructure staging will influence the development schedule. Note: The RGU must assure that the development described complies with the requirements of MN Rules 4410.3610, Subpart 3 (and also that it properly orders the AUAR and sets the description in that order as required by 4410.3610, Subpart 3). INTRODUCTION This Alternative Urban Areawidc Rcview (AUAR) was initiatcd by the Guidant Corporation (Guidant) to identify and document potential cumulative environmental impacts and infrastructure needs related to the further development of the Guidant Campus Guidant Campus Master Plan Final AUAR and Mitigation Plan January 2003 - 3 - I I. I I I I I I I " I I I I I I I. I I through the year 2019. The AUAR allows the City to evaluate the cumulative effects of all anticipated development in the area at once rather than reviewing individual phases of development separately. Although the training center (Building L) received site plan review approval from the City in April 2002 as an independent action prior to the actions for the proposed Master Plan, the entire Guidant Campus (including Building L) will be included in the AUAR. The City of Arden Hills City Council ordered the preparation of an AUAR for the Master Plan on September 9,2002. See Appendix B. STUDY AREA DESCRIPTION The Guidant Campus (the AUAR study area) is a 92.7-acre site in the northwestern part of the City of Arden Hills (see Figures I and 2). While the campus lies entirely within the City of Arden Hills, its eastern boundary is directly adjacent to the City of Shoreview. Major highways in the area include Interstate 694 (1-694) approximately one quarter-mile to the south, and 1-35W approximately 1.5 miles to the west. The 1-35W/I-694 interchange is approximately 2 miles west of the proposed campus. The campus is south of Guidant Drive North, north of County Road (CR) F, west of Lexington Avenue and east of Hamline Avenue. Hamline Avenue and Lexington Avenue both have interchange access to I-694 south of the proposed campus area. Traffic traveling west on I-694 can exit at Hamline A venue and gain access to the site; however, traffic traveling east on 1-694 can only travel south on Snelling A venue thereby not providing access to the Guidant Campus. The entire site is owncd by Guidant, including Building 0, a 7.I-acre parcel located in the northwest comer of the site known as the Nestle's property. This parcel was purchased by Guidant in August of 2002. The AUAR study area currently includes office and limited industrial land uses, as well as approximately 28.5 acres of vacant land. The study area is within the Metropolitan Council's current Metropolitan Urban Service Area (MUSA) and is served by City sewer and water. The Guidant Campus Master Plan is consistent with the proposed land use and zoning found in the City's adopted 1998 Comprehensive Plan. DEVELOPMENT SCENARIO TO BE STUDIED IN THE AUAR The AUAR process studied one development scenario that represents the "worst case" (i.e., most intensive) development concept being considered for the site (see Figure 4). The Guidant Campus Master Plan has a three-stage development concept (see Table I). Phase] is planned for construction within the southern half of the campus and includes Addition] to existing Building D, Buildings K (with only three floors to be occupied, initially) and L and Ramps #1 (600 cars) and #5 (900 cars). The location for Phase II is primarily in the western half of the campus with a new ramp on the most southeastcrn portion of the campus and includes Buildings G and H and Addition J to Building E as well as Ramps #2 (750 cars), #3 (400 cars) and #6 (900 cars). Phase III will conclude the development and occur in the northern half of the campus and includes Buildings M and N Guidant Campus Master Plan Final AUAR and Mitigation Plan January 2003 - 4- I I. I I I I I I I ae I I I I I I I. I I and Ramps #4 (1,335 cars) and #7 (2,142 cars). The proposed development will add 1,029,000 square feet of office/limited industrial space to the existing 1,158,893 square foot of office/limited industrial uses for a total of 2,187,893 square feet of office/limited industrial. To accommodate the additional parking demand on the campus, seven new parking ramps will be constructed and will provide 7,027 parking spaces. The proposed development will also include 615 surface parking spaces. The proposed parking spaces will replace the existing 3,331 surface parking spaces, resulting in a net increase of 4,31l parking spaces. Figure 4 shows the Master Plan for development of the Guidant Campus through 2019. Table I shows the worst-case development scenario assumptions for intensity and staging of development within the AUAR study area. TABLE 1 STAGING AND INTENSITY OF THE PROPOSED DEVELOPMENT Staging Existing (2002) Intensity 1,158,893 GSF office/limited industrial (includes Building 0) 3,331 surface parking spaces* Phase I (2005) 419,800 GSF office/limited industrial 1,500 parking ramp stalls Phase II (20 I 0) 332,000 GSF office/limited industrial 2,050 parking ramp stalls Phase ill (20l5) 277,200 GSF office/limited industrial 3,477 parking ramp stalls 2,187,893 GSF office/limited industrial 7,027 parking ramp stalls and 615 surface parking spaces * All but 615 surface lot parking spaces of the existing 3,331 will be replaced by parking ramp stalls through a phased process to meet the parking demands of the added office space. Surface parking areas may not be replaced by the parking ramps but may be replaced by other cover types. (Refer to Item 10 for more information on cover types.) Total INFRASTRUCTURE Infrastructure improvements to facilitate the development of the Guidant Campus include transportation and storm water conveyance/treatment systems. The City of Arden H ills has confirmed that the existing water and sanitary sewer service to the site has the capacity for the additional proposed campus needs. Guidant Campus Master Plan Final AllAR and Mitigation Plan January 2003 - 5 - 1 I. I I I I I I I -- I I I I I I I. I I Roadways One public road, Femwood Avenue, currently bisects the campus (see Figure 3). Femwood Avenue serves the AUAR study area buildings as well as the businesses just north of the study area along Guidant Drive North. The other main roadway on the site is Guidant Drive North. Although this is a private roadway owned by Guidant, the roadway is also used by businesses to the north to gain access to and from Lexington Avenue. The concept plan for Phase I (see Table l) of the Master Plan proposes to convert Guidant Drive North to a public roadway and ultimately vacate Fernwood Avenue to provide safer movement of employees through the proposed campus. Although these roadway improvements are included in the Master Plan concept that is currently being developed for the site, the improvements have not been approved by the City. Refer to Items 21 and 25.C for more details. Sanitarv Sewer The study area is currently served by city sanitary sewer. Three lines serve the campus and are located in CR F, Hamline Avenue and in Fernwood Avenue. The City of Arden Hills has confirmed that the existing sanitary sewer main lines have adequate capacity to serve the proposed development. Lateral line extensions will be made, as needed, to the existing sanitary sewer main line in Fernwood Avenue to serve the new buildings. Refer to Item 18 for more details. Water Supply Existing water mains are located in CR F, Hamline Avenue and in Fernwood Avenue. The City of Arden Hills has confirmed that the existing water mains have adequate capacity to serve the proposed development. Connections from the existing water lines in Femwood A venue to the new buildings will be required and added as needed. Refer to Item 13 for more details. Storm Water Storm water runoff from the existing site condition discharges directly into the wetlands on and adjacent to the campus. The campus expansion will provide for treatment prior to storm water entering the wetlands by methods of infiltration, retention and NURP ponds in accordance with the City of Arden Hills and Rice Creek Watershed District requirements. The overall storm water runoff volumes will decrease from existing conditions as the proposed campus expansion will decrease the amount of impervious surface area. Refer to Item 17 for more details. 7. PROJECT MAGNITUDE DATA AUAR: The cumulative totals of the parameters called for should be given for each major development scenario, except that inFormation on "manufacturing," "other industrial, " "institutional," "agricultural," and "building heights" is optional. TOTAL PROJECT AREA (ACRES): 92.7 OR LENGTH (MILES) NA Guidant Campus Master Plan final AUAR and Mitigation Plan - 6- January 2003 I I. I I I I I I I - I I I I I I I. I I The scope of the Master Plan is based on Guidant's growth over the next 18 years. Guidant plans to have a net increase of 4,000 employees on the 92.7-acre site currently used for office/limited industrial uses. The total development will include six new office buildings, two additions to current buildings and the use of the recently acquired Building o (refer to the project description in Item 6 for more detail). The proposed development will add 1,029,000 square feet of office/limited industrial space to the existing 1,158,893 square foot of office/limited industrial uses for a total of 2,187,893 square feet of office/limited industrial. To accommodate the additional parking demand on the campus, seven new parking ramps will be constructed and will provide 7,027 parking spaces. The proposed development will also include 615 surface parking spaces. The proposed parking spaces will replace the existing 3,331 surface parking spaces, resulting in a net increase of 4,311 parking spaces. The buildings and parking ramps proposed in the Master Plan will range in height from 30 to 135 feet above grade. Parking ramps on the campus have been designed to accommodate parking levels below grade to the extent feasible, thereby reducing the overall height of the ramps and further minimizing the visual impact to adjacent residents. Ramps 3 and 4 in the northwest portion of the site will be constructed with one and two levels below grade, respectively. Ramps 5, 6 and 7 will be constructed with two levels below grade and Ramps I and 2 will be constructed with half a level below grade. Table 2 identifies the height of the existing and proposed buildings and ramps. TABLE 2 BUILDING AND PARKING RAMP HEIGHTS (EXISTING AND PROPOSED) Building/ Existinl! (feet) Pro Dosed (feet) Height Height Height Height Parking Number of Stories Ramp from Above Sea from Above Grade Level Grade Sea Level Building A 3 57 1037 Building B 3 42 1034 Building C 3 42 1034 Building D 3 25 995 Building E 3 30 1005 Building F 3 46 1032 Building G 3 60(1) 1023 Building H 3 60(1) 1025 Building I 2 30 1005 Building J 2 30 1005 Building K 8 135(1) ll05 -- 6zi') Building L 3 1036 Building M 4 75(1) l059 Building N 4 75(1) 1065 Guidant Campus Master Plan Final AUAR and Mitigation Plan -7 - January 2003 I I. I I I I I I I - I I I I I I I. I I TABLE 2 (continued) BUILDING AND PARKING RAMP HEIGHTS (EXISTING AND PROPOSED) Building/ Existinl! (feet) Proposed (feet) Height Height Height Height Parking Number of Stories Ramp from Above Sea from Above Sea Grade Level Grade Level Building 0 I 40 1,040 Ramp I 4 (1/2 level below grade) 40(2) 1005 Ramp 2 5 (1/2 level below grade) 50(2) 1005 Ramp 3 4 (1 level below grade) 30(2) 1000 Ramp 4 5 (2 levels below grade) 30(2) 1015 Ramp 5 6 (2 levels bclow grade) 40(2) 1026 Ramp 6 6 (2 levels below grade) 40(2) 1030 Ramp 7 6 (2 levels below grade) 40(2) 1032 11) Building height from grade includes approximate 15-foot height of penthouse. (2) Ramp heights include the height above grade to the upper-most portion of the structure. The wall on the upper level parking surface is approximately 8 to 10 feet lower than the maximum height provided in the table. In planning for the needs of the Guidant Campus, the architect had the opportunity to maintain visibly compatible building heights by taking advantage of the lower elevation in the southern portion of the campus. Buildings planned for the southern portion of the campus will accommodate more of the capacity needs of the proposed campus and therefore, be taller but will appear similar in height to the existing and proposed buildings and ramps due to the lower grade elevation. 8. PERMITS AND APPROVALS REQUIRED EAW: LIST ALL KNOWN LOCAL, STATE AND FEDERAL PERMITS, APPROVALS AND FUNDING REQUIRED. AUAR: A listing of major approvals likely to be required by the anticipated types of development projects should be given. This list will help orient reviewers to the idea that the A UAR process is only one piece of the regulatory framework that will protect environmental resources. The list can also serve as a starting point for the development of the implementation aspects of the mitigation plan to be developed as part of the A UAR. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 8 - January 2003 I I. I I I I I I I .- I I I I I I I- I I TABLE 3 REQUIRED PERMITS AND APPROVALS Unit of Government Permit or Approval City of Arden Hills Preliminary and Final Plat Approval, Preliminary and Final Planned Unit Development Approval; Land Disturbance and Erosion Control Plan and Permit; Water Connection Permits; Building Permits; Street Vacation; Site Plan Reviews for Each Building -~ -- Rice Creek Watershed District Storm Water and Water Quality Plan Review and Approval; Minnesota Wetland Conservation Act --. Replacement Plan review and approval Ramsey County Contiguous Plat Review - Ramsey County Department of Public Health Plan Review of any Food Services; Small Quantity Hazardous Generator license Metropolitan Council Permit for Utility Connection; Industrial Waste Discharge Permit ---- -- ----- Minnesota Pollution Control Agency NPDES Construction Permit Army Corps of Engineers Section 404 approval for wetland impacts. 9. LAND USE EAW: DESCRIBE CURRENT AND RECENT PAST LAND USE AND DEVELOPMENT ON THE SITE AND ON ADJACENT LANDS. DISCUSS THE COMPATIBILITY OF THE PROJECT WITH ADJACENT AND NEARBY LAND USES; INDICATE WHETHER ANY POTENTIAL CONFLICTS INVOLVE ENVIRONMENTAL MATTERS. IDENTIFY ANY POTENTIAL ENVIRONMENTAL HAZARD DUE TO PAST LAND USES, SUCH AS SOIL CONT AMINA TlON OR ABANDONED STORAGE TANKS. AUAR.' No changes from the EA W form. The A UAR study area is an approximatcly 92.7 -acre site in thc eastern central part of the City of Arden Hills locatcd approximately three-quarters of a mile north of the Lexington Avenue/I-694 interchange (see Figure 2). The AUAR study area has been dcvcloped for approximately 40 years and currently includes office and limited industrial land uses. Approximately 28.5 acrcs of undcveloped land has remained on the site including wctlands, woodcd areas, brush and grassland. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 9- January 2003 I I. I I I I I I I 18 I I I I I I I. I I Guidant Corporation has owned a rectangular parcel of the site encompassing approximately 45 acres in the southwest corner (where existing Buildings A, B, C, D and E are located) since the mid-1970s. The eastern portion of the site (where existing Building F is located) was owned and occupied by Control Data Systems from 1962 until 1998. The site was originally used in 1962 by Control Data Systems as a computer manufacturing facility but was converted into office spaces for Control Data Systems and individual tenant spaces when manufacturing was discontinued at the site in the 1980s. Control Data Systems occupied a majority of the office space and the remainder was leased to tenants that had limited manufacturing or office space needs. The site was owned by LAlCBBC, Inc., a California firefighter's pension, from 1998 until 2000. Several tenants including Guidant, lease space in Building F. Guidant has been a tenant of Building F since 1995, and they purchased the majority of the site (all properties except for Building 0) in 2000. The other tenants will not continue to occupy the campus as part of the Master Plan. The 35,000-square foot Building 0 (the former Nestle's building) situated on a 7.I-acre lot located northwest of the existing Guidant structures was recently (August 2002) purchased. Building 0 was formerly used for manufacturing dog food but will be used by Guidant for a research team (consisting of 25 to 30 employees) as well as for storage. As part of this acquisition, process equipment will be removed from the west side of the building. The land uses proposed for the campus Master Plan are consistent with the existing site land use, as well as the City's 1998 Comprehensive Plan (see Figures 5 and 6). The 1998 Comprehensive Plan zoning map identifies the proposed campus and areas north and south of the campus as I-I (Limited Industrial District) (sce Figure 7). The purpose for an I-I (Limited Industrial District) is to allow only those types and intensities of industrial uses that do not detract from the surrounding area and to maintain performance standards to keep the intensity of land utilization lower than in the general Industrial District. The Guidant Master Plan proposes campus developmcnt within the area currently occupied by office/limited industrial uses and maintains a "green" buffer between the campus and adjacent land uses in conformity with zoning regulations. Land use in the areas northwest and west of the AUAR study area (in the City of Arden Hills) includes single-family residential. Land use immediately north and south of the study area (also in the City of Arden Hills) is dominated by commercial/business development (office buildings). The CSM Corporation owns and occupies office buildings north of the campus. The Fair Isaac Company is a tenant of this office complex and employs approximately 700 people. An Xcel Energy electrical sub-station is located directly south of the campus, north of CR F. Arden Woods Office Building, located south of CR F and the campus, is a three-story multi-tenant office building. Also located south of the campus is the Land 0' Lakes corporate headquarters. Land use east of the study area (in the City of Shoreview) is dominated by business campuses, including the Medtronics business campus, and also includes townhomes and apartment buildings. Guidant Campus Master Plan Final AUAR and Mitigation Plan January 2003 - ]0- I I. I I I I I I I Ie I I I I I I I. I I The land use zoning districts in the area are identified by the City of Arden Hills as I-I zoning to the north and south, and R-l (single-family residential) zoning to the west and northwest. Currently, office buildings are located in these areas zoned as 1-1. The City of Shoreview's Comprehensive Guide Plan (approved April 2000) identifies land uses in the study area as medium density (RM) and high density (RH) residential as well as office use. The City of Shoreview's zoning document identifies multi-dwelling residential (R-3) and Planned Unit Development (PUD) zoning in the study area. The existing land uses are consistent with these zoning districts. Potential Environmental Hazards Prior to purchasing the property formerly owned by Control Data Systems, two Phase I Environmental Site Assessments (ESA) were completed for this portion of the site. The 1997 ESA covered Building F and its boilers (see Figure 3) and the 1998 ESA covered the 37.21-acre Control Data Campus in Arden Hills, which includes Building F and adjacent land. The 1997 ESA revealed no indications of recognized environmental conditions. The 1998 ESA concluded that operations on the Control Data Campus did not pose a significant environmental concern. However, it was the recommendation of the 1998 ESA that a limited subsurface investigation be conducted in the vicinity of the former fuel oil underground storage tanks (USTs) and that sampling of elevator hydraulic fluids for polychlorinated biphenyls be conducted. A Spill Prevention Control and Countermeasures (SPCC) Plan and Risk Managcment Plan (RMP) was recommended for the Control Data Systems operations occurring on the site at the time of this ESA. The Guidant Corporation has an SPCC and RMp for their operations. A subsurface investigation in the fonner UST area (identified in the 1998 ESA) was conducted. Fuel oil impacts were noted in two of the boring locations. Further investigation was conducted at these locations and it was determined that the impacts wcre limited to the shallow subsurface soils. The fuel oil impacted soils were removed and the MPCA stated that no further action was required related to the former fuel oil USTs. A liquid oil sample was taken from each of the four elevator hydraulic oil reservoirs. The test results revealed there were no concentrations of poly chi orin at cd biphenyls (PCBs) at or above laboratory method detection limits and therefore, no recommendations were provided for further investigation. No further studies have been completed by Guidant for the rcmainder of the Guidant Campus not included in the aforementioned ESA's; however, in September 2001, as part of the completion of the Arden Hills Local Storm Water Management Plan (February 2002), the Minnesota Pollution Control Agency provided the City of Arden Hills information regarding contaminated site in the vicinity of Arden Hills. No sites of concem were idcntificd on or immediately adjacent to the AU AR study area_ It is not anticipated that other environmental hazards will be encountered on the Guidant Campus site. Guidant Campus Master Plan Final AUAk and Mitigation Plan -11- January 2003 I I. I I I I I I I Ie I I I I I I I- I I 10. COVER TYPES EAW: ESTIMATE THE ACREAGE OF THE SITE WITH EACH OF THE FOLLOWING COVER TYPES BEFORE AND AFTER DEVELOPMENT (BEFORE AND AFTER TOTALS SHOULD BE EQUAL). A UAR: The following information should be provided instead: A. A cover type map, at least at the scale of a USGS topographic map, depicting: . wetlands - identified by type (Circular 39) watercourses - rivers, streams, creeks, ditches lakes - identify protected waters status and shoreland management classification woodlands - breakdown by classes where possible grassland - identify native and oldfield cropland current development . . . . . . Table 4 summarizes the estimated acreage of the site with each of the following cover types before and after development. Figures 8 and 9 depict existing and proposed cover types, respectively. TABLE 4 EXISTING AND PROPOSED COVER TYPES (WORST-CASE SCENARIO) Before acreage After acreage (square feet) (square feet) Type 1-8 wetlands 5.9 (257,004 ft2) 5.9 (257,004 ft2il1 W ooded/F orest 17.6 (766,656 ft2) 13.7 (596,772 ft2) Brush/grassland 5.0 (217,800 ft2) 2.0 (87,120 ft2) Cropland - 0 - - 0 - Lawn/Landscaping l1.4 (496,584 ft2) 23.5 (1,023,660 ft2) Impervious (Buildings & pavement) 52.8 (2,299,968 ft2) 45.0 (1,960,200 ft2) Created ponding - 0 - 0.5 (2l,780 ft2) Created infiltration areas - 0 - 2.1 (91,4762) TOTAL 92.7 (4,038,012 ft2) 92.7 (4,038,012 ft2) (I) Refer to Item 12 for a detailed description of wetland impacts and the proposed wetland mitigation. Guidant Campus Master Plan Final AUAR and Mitigation Plan J an\lary 2003 - 12 - I I. I I I I I I I Ie I I I I I I I. I I B. An "overlay" map showing anticipated development in relation to the cover types; this map should also depict any ''protection areas, " existing or proposed, that will preserve sensitive cover types. Separate maps for each major development scenario should generally be provided. . Figure 8 in Appendix A illustrates existing cover types within the AUAR study area, along with current development. . Figure 9 in Appendix A depicts proposed redevelopment parcels with proposed cover types. 11. FISH, WILDLIFE, AND ECOLOGICALLY SENSITIVE RESOURCES EAW: A: DESCRIBE FISH AND WILDLIFE RESOURCES ON OR NEAR THE SITE AND DISCUSS HOW THEY WOULD BE AFFECTED BY THE PROJECT. DESCRIBE ANY MEASURES TO BE TAKEN TO MINIMIZE OR AVOID ADVERSE IMP ACTS. AUAR: A: The description of wildlife and fish should be related to the habitat types depicted on the cover types maps of Item 10. Any differences in impacts between development scenarios should be highlighted in the discussion. As identified in Item 9, the majority of the AUAR study area and surrounding property is developed. Wooded and grassy areas on the property and residential yards near the project provide habitat to small mammals suited to urban environments (typically including squirrels, raccoons and chipmunks). Birds commonly found in urban areas include grackles, robins, starlings, crows, blue jays and cardinals. Several wetlands on the site and adjacent land may provide habitat for frogs and turtles (see discussion of Blanding's turtles in Item 11.B, below). Construction of the project will necessitate some wetland filling and trec removal. As a result, the proposed project will result in some negative impact on habitat. Impacts to wildlife will be minimized by avoiding disturbance to most of the wooded areas around the perimeter of thc site and avoiding impacts to wetlands where possible. A wooded area at the northeast comer of the property will remain undisturbed. Wetlands and associated undeveloped uplands at the northwest corner of the property will also remain largely undisturbed. Impacts to wetlands are described in detail in Item 12. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 13 - January 2003 I I. I I I I I I I ,e I I I I I I ! .- I EAW: B. ARE THERE ANY STATE-LISTED ENDANGERED, THREATENED, OR SPECIAL- CONCERN SPECIES; RARE PLANT COMMUNITIES; COLONIAL WATERBIRD NESTING COLONIES; NATIVE PRAIRIE OR OTHER RARE HABITAT; OR OTHER SENSITIVE ECOLOGICAL RESOURCES ON OR NEAR THE SITE? NO lL YES IF YES, DESCRIBE THE RESOURCE AND HOW IT WOULD BE AFFECTED BY THE PROJECT. INDICATE IF A SITE SURVEY OF THE RESOURCES WAS CONDUCTED. DESCRffiE MEASURES TO BE TAKEN TO MINIMIZE OR AVOID ADVERSE IMP ACTS. AUAR: B. For an A UAR, prior consultation with the DNR Natural Heritage program for information about reports of rare plant and animal species in the vicinity is required. If such consultation indicates the need, an on-site habitat survey for rare species in the appropriate portions of the AUAR area is required. Areas of on-site surveys should be depicted on a map, as should any "protection zones" established as a result. A search (ERDB# 20030006) of the Minnesota Department of Natural Resources (DNR) - Natural Heritage database was conducted for an area within an approximate I-mile radius of the project site. The DNR report is included in Appendix C. No observations of rare plant or animal species or significant natural features were identified on the project site. However, the database search revealed that the project site is within a "known concentration" area of Blanding's turtles (Emydoidea blandingii), a species listed as threatened in Minnesota. The DNR has identified 13 such "known concentration" areas in the state and gives these areas highest priority for rcsearch and management activities. In addition, these areas are relied upon to maintain the species' security in the state. The prefened habitat of the Blanding's turtle is calm, shallow water and dense aquatic vegetation. The Blanding's turtle prefers to nest in large areas of undisturbed, sandy uplands. The Blanding's turtle's late maturation, low reproductive potential, long-lived adults and high mortality of eggs and juveniles are factors that make it particularly susceptible to human disturbanccs. As stated in thc excerpt from the DNR publication Minnesota's Endangered Flora and Fauna (included in Appendix C), "Population and reproductive dynamics suggest viable populations of Blanding's turtles are dependent on large numbers of animals and adequate areas of undisturbed habitat" The DNR search includes ten observations of Blanding's turtles near the project site. The dates of these observations rangc from 1988 to 1998. The sightings of Blanding's turtles included in the DNR report were noted 200 feet west of the Guidant Campus; near Marsden Lake (locatcd one-half to one and one-half miles north of the project site along the east side of the Twin Cities Army Ammunition Plant (TCAAP) site); and near Snail Lake (located approximately one half mile northeast of the project site). Three of the sightings wcrc observed within approximately one half mile of the site to the north, Guidant Campus Master Plan Final AUAR and Mitigation Plan - 14- January 2003 I I. I I I I I I ,I we I I I I I I I. I I presumably around Karth Lake. Since the Draft AUAR was published, the DNR has added another Blanding's turtle sighting in the vicinity of the campus to their database based on adjacent resident sightings (see the DNR's November 14, 2002 letter in Appendix C). Almost all of the land between the project site and the areas where turtles have been identified is developed, medium density, residential land and is not considered favorable habitat for Blanding's turtles. Nevertheless, there is a possibility that Blanding's turtles could use portions of the site, particularly the shallow wetland (see Figure 10, Wetland L) and surrounding undisturbed sandy loam (132B and 132C) upland located at the northwest comer of the property. Refer to Items 12 and 19 for more details on wetlands and soils on the campus. No survey of the AUAR study area has been conducted to determine the presence of Blanding's turtles. Coordination with the DNR Natural Heritage division confirms that a survey of the study area is not necessary as the recommended avoidance and mitigation measures identified below will be implemented as practicable. A list of recommendations for avoiding and minimizing impacts to Blanding's turtles and their habitat is included in the DNR report. These recommendations will be implemented where feasible. The measures that will likely be appropriate for project construction include: I) Placement of silt fencing around construction areas to keep turtles out of construction areas in the spring. 2) Notifying contractors of the possibility of threatened turtles III the area and instructions on how to avoid harm to turtles if they are spotted. 3) Minimization of impacts to wetlands on the site. 4) Preservation of un-mowed upland buffer around wetlands on the site. 5) Preservation of some undisturbed upland at the northwest comer of the site. 12. PHYSICAL IMPACTS ON WATER RESOURCES EAW: WILL THE PROJECT INVOLVE THE PHYSICAL OR HYDROLOGIC ALTERATION (DREDGING, FILLING, STREAM DIVERSION, OUTFALL STRUCTURE, DIKING, IMPOUNDMENT) OF ANY SURFACE WATER (LAKE, POND, WETLAND, STREAM, DRAINAGE DITCH?) NO l YES IF YES, IDENTIFY THE WATER RESOURCE TO BE AFFECTED AND DESCRIBE: THE ALTERATION, INCLUDING THE CONSTRUCTION PROCESS; VOLUMES OF DREDGED OR FILL MATERIAL; AREA AFFECTED; LENGTH OF STREAM DIVERSION; WATER SURFACE AREA AFFECTED; TIMING AND EXTENT OF FLUCTUATION IN WATER SURFACE ELEVATlONS; SPOILS DISPOSAL SITES; AND PROPOSED MITIGATION MEASURES TO MINIMIZE IMP ACTS. Guidant Campus Master Plan Final AUAR and Mitigation Plan January 2003 - 15 - I '. '. I I I I I I Ie I I I I I I '. I I AUAR: The information called for on the EA W form should be supplied for any of the infrastructure associated with the AUAR development scenarios, and for any residential or commercial development expected to physically impact any water resources. Where it is uncertain whether water resources will be impacted, depending on the exact design of future developments, the AUAR should cover the possible impacts through a "worst case scenario" or else prevent impacts through the provisions of the mitigation plan. Wetlands Twelve wetlands were identified within the AUAR study area. Wetlands on the project site were identified, characterized and delineated by Sanders Wacker Bergly, Inc. The results of this work are presented in a Wetland Delineation Report dated May 28, 2002. Twelve wetlands were identified on the site and labeled A, B, D through K 1, and K2 (see Figure 10). Impacts to wetlands will be avoided where possible. Based on preliminary design information, four of the twelve basins will be impacted with the Guidant Campus expansion. A summary of the wetlands identified on the project site and proposed impacts is presented Table 5. TABLE 5 WETLAND SUMMARY Wetland Name Wetland Type Approximate Size of Approximate Area Wetland of Impact Wetland A Deep marsh (Type 4/5) 0.4 Acre 0.15 Acre Wetland B Wet meadow (Type 2) 0.2 Acre No Impact Wetland D Shallow marsh (Type 3/4) 2.3 Acres No Impact Wetland E Deep marsh (Type 4/5) 1. 7 Acres No Impact Wetland F Deep marsh (Type 4) 0.2 Acre No Impact Wetland G Deep marsh (Type 4) 0.2 Acre No Impact Wetland II Deep marsh (Type 4) 0.1 Acre No Impact Wetland 1 Deep marsh (Type 4) 1.2 Acre No Impact Wetland J Deep marsh (Type 4) 0.1 Acre 0.1 Acre Wetland Kl Shallow marsh (Type 2/3) 0.1 Acre 0.1 Acre Wetland K2 Shallow marsh (Type 2/3) 0.1 Acrc 0.1 Acrc Wetland U" Shallow Marsh (Type 3) 0.1 No Impact Total Area: 6.7 Acres(2) 0.45 Acre (l)\\retland \'Vas not delineated, size and type are estimated. (2) Not all of the \vetlands lie entirely within the AUAR Study area boundary. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 16- January 2003 I I. I I I I I I I Ie I I I I I I I' I- I To comply with requirements of the Minnesota Wetland Conservation Act, wetland impacts will be offset by creating mitigation at a 2: 1 ratio (2 acres of mitigation area for each acre of impacted area). A detailed wetland mitigation plan has not been completed; however, the plan will include new wetland creation as well as the use of Public Value Credits (PVC) through the design of storm water ponds in accordance with WCA. Existing wetlands located near the northwest corner of the site will likely be enlarged to create new wetland area. As outlined in Item 8, permits will be required from the Army Corps of Engineers and the Rice Creek Watershed District for wetland alterations. As part of the permit approval process, a final mitigation plan will be submitted to these agencies documenting proposed wetland impacts and detailed mitigation. Item 17 describes mitigation for storm water impacts, including impacts on existing wetlands of the proposed development. The proposed storm water treatment plans will improve wetland quality by removing sediment, organics and other debris prior to the storm water entering the wetlands as it does under thc existing condition. 13. WATER USE EAW: WILL THE PROJECT INVOLVE THE INST ALLA TION OR ABANDONMENT OF ANY WELLS, CONNECTION TO OR CHANGES IN ANY PUBLIC WATER SUPPLY OR APPROPRIATION OF GROUND OR SURFACE WATER (INCLUDING DEW A TERING)? NO L YES IF YES, AS APPLICABLE, GIVE LOCATION AND PURPOSE OF ANY NEW WELLS; PUBLIC SUPPLY AFFECTED, CHANGES TO BE MADE, AND WATER QUANTITIES TO BE USED; THE SOURCE, DURATION, QUANTITY AND PURPOSE OF ANY APPROPRIATIONS; AND UNIQUE WELL NUMBERS AND DNR APPROPRIATION PERMIT NUMBERS, IF KNOWN. lDENTlFY ANY EXISTING AND NEW WELLS ON THE SITE MAP. lF THERE ARE NO WELLS KNOWN ON SITE, EXPLAIN METHODOLOGY USED TO DETERMINE. AUAR: If the area requires new water supply wells, specific information about that appropriation and its potential impacts on groundwater levels should be given; if groundwater levels would be affected, any impacts resulting on other resources should be addressed. Guidant Campus Master Plan Final AUAR and Mitigation Plan January 2003 - 17- I I. I I I I I I I Ie I I I I I I I. I I The City of Arden Hills has confirmed that the existing water lines servicing the proposed campus have the capacity to handle the additional volume of water required for campus needs. The City has also confirmed that their drinking water source, the St. Paul Water Utility, can provide the additional drinking water required for the proposed campus through the City of Roseville. As discussed in Item 6, existing water lines servicing the study area are located in CR F, Hamline Avenue and Fernwood Avenue. These additional connections will be made as needed during tbe phased development of the AUAR study area. The proposed campus will require approximately 41,715 additional gallons of water per day over the existing need of 47,560 gallons per day for a total of 93,866 gallons per day. These quantities do not include water used by Building F, which is served by two wells. No additional connections will need to be made to the City water lines located in CR F or Hamline Avenue with the campus expansion. However, additional connections to the water and sanitary mains will need to be made in Fernwood Avenue. Calculations for determining the amount of water assume that for office/limited industrial space there is three employees per 1,000 square feet, requiring 15 gallons of water per person per day. There are two wells located on the campus (see Figures 3 and 4). These wells serve Building F and will continue to serve only Building F. The water tower, located on the campus, is no longer used. At one time water was drawn from the tower for fire protection. The existing automatic fire sprinkler system is now connected to Ci ty water. 14. WATER-RELATED LAND USE MANAGEMENT DISTRICTS EAW: DOES ANY PART OF THE PROJECT SITE INVOLVE A SHORELAND ZONING DISTRICT, A DELINEATED 100-YEAR FLOOD PLAIN, OR A STATE OR FEDERALLY DESIGNATED WILD OR SCENlC RIVER LAND USE DISTRICT? ----"L NO YES IF YES, IDENTIFY THE DISTRICT AND DISCUSS THE COMPATIBILITY OF THE PROJECT WITH THE LAND USE RESTRICTIONS OF THE DISTRICT. ALSO, SUCH DISTRICTS SHOULD BE DELINEATED ON APPROPRIATE MAPS AND THE LAND USE RESTRICTIONS APPLICABLE IN THOSE DISTRICTS SHOULD BE DESCRIBED. IF ANY VARIANCES OR DEVIATIONS FROM THESE RESTRICTIONS WITHIN THE AUAR AREA ARE ENVISIONED, THIS SHOULD BE DISCUSSED. AUAR: Such districts should he delineated on appropriate maps and the land use restrictions applicable in those districts should be described. lfany variances or deviations from these restrictions within the A UAR area are envisioned, this should be discussed. Not Applicable. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 18 - Jamlal] 2003 I I. I I , I I I I Ie I . I I I I I. I I 15. WATER SURFACE USE EAW: WILL THE PROJECT CHANGE THE NUMBER OR TYPE OF WATERCRAFT ON ANY WATER BODY? THIS ITEM NEED ONLY BE ADDRESSED IF THE AUAR AREA WOULD INCLUDE OR ADJOIN RECREATIONAL WATER BODIES. l NO YES IF YES, INDICATE THE CURRENT AND PROJECTED WATERCRAFT USAGE AND DISCUSS ANY POTENTIAL OVERCROWDING OR CONFLICTS WITH OTHER USERS OR FISH AND WILDLIFE RESOURCES. AUAR: This item need only be addressed if the A UAR area would include or adjoin recreational water bodies. Not Applicable. 16. EROSION AND SEDIMENTATION EAW: GIVE THE ACREAGE TO BE GRADED OR EXCAVATED AND THE CUBIC YARDS OF SOIL TO BE MOVED: ACRES ; CUBIC YARDS . DESCRIBE ANY STEEP SLOPES OR HIGHLY ERODIBLE SOILS AND IDENTIFY THEM ON THE SITE MAP. DESCRIBE ANY EROSION AND SEDIMENTATION CONTROL MEASURES TO BE USED DURING AND AFTER PROJECT CONSTRUCTION. AUAR: The number of acres to be graded and the number of cubic yards of soils to be moved need not be given; instead, a general discussion of the likely earthmoving needs for development of the area should be given, with an emphasis on unusual or problem areas. in discussing mitigation measures, both the standard requirements of the local ordinances and any special measures that would be added for A UAR purposes should be included. While it is premature to determine the detailed earthmoving requirements for the future development phases, because the redevelopmcnt sites arc relatively fiat and most arcas have been previously developed, unique and/or unusual earthwork requirements for the proposcd redevelopment are not anticipated. The potential for erosion and sedimentation of soils exposed during redevelopment of the AUAR study area will be minimized by using Bcst Managcment Practices (BMPs) during and afier construction. Erosion control practices will be identified in the final site grading and construction plans as required by the NPDES pem1it and in accordance with the City of Arden Hills and Rice Creek Watershed District's erosion/sedimentation control standards. Guidant Campus Master Plan Final AUAR and Mitigation Plan -]9 - January 2003 I I. I I' I I I I I Ie I I I I I I I. I I All erosion control measures shall be installed prior to grading operations and maintained until all disturbed areas have been restored. Streets will be swept as necessary where construction sediment has been deposited. Also, NURP ponds must be constructed before main grading. After construction, all disturbed areas will be either paved or vegetated to eliminate exposed soil surfaces. Removal of erosion control measures will not occur until all disturbed areas have been stabilized. 17. WATER QUALITY - SURFACE WATER RUNOFF EAW: A. COMPARE THE QUANTITY AND QUALITY OF SITE RUNOFF BEFORE AND AFTER THE PROJECT. DESCRIBE METHODS TO BE USED TO MANAGE AND/OR TREAT RUNOFF. B. IDENTIFY THE ROUTE(S) AND RECENING WATER BODIES FOR RUNOFF FROM THE SITE. ESTIMATE THE IMPACT OF THE RUNOFF ON THE QUALITY OF THE RECENING WATERS. AUAR: For an AUAR, the following additional guidance should befollowed in addition to that in the "EA W Guidelines. " . It is expected that an AUAR will have a detailed analysis of storm water issues. . A map of the proposed storm water management system and of the water bodies that will receive storm water should be provided. The description of the storm water management should identifY on-site and "regional" detention ponding and also indicate whether the various ponds will be new water bodies or converted existing ponds or wetlands. Where on-site ponds will be used but have not yet been designed, the discussion should indicate the design standards that will be followed. . If present in or adjoining the A UAR area, the following types of water bodies must be given special analyses: Lakes: Within the Twin Cities metro area a nutrient budget analysis must be prepared JiJr any "priority lake" identified by the Metropolitan Council (see Appendix E of "}''A W Guidelines" (1990) or contact the Council stafJ). Outside of the metro area, lakes needing a nutrient budget analysis must be determined by consultation with MPCA and DNR staIJs; Trout streams: If storm water discharges will enter or aIJect a trout stream, an evaluation of the impacts on the chemical composition and temperature regime of the stream and the consequent impacts on the trout population (and other species of concern) must be included. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 20- January 2003 I I. I I I I I I I Ie I I I I I I I. I I According to the February 2002 Local Storm Water Management Plan (LSMP) for the City of Arden Hills, the AUAR study area is located within the Valentine Lake district in the Rice Creek Watershed District (RCWD). There are 13 wetlands in or near the study area. Seven of the wetlands are affected by the existing and future drainage from the proposed project. These seven wetlands include Wetlands A, C, D, E, F, G and L and are shown in Figure 10. The City's storm water management plan lists the seven wetlands and Valentine Lake as Tier 3 water bodies, which indicates that the intended uses do not include direct human contact with the water. Tier 3 water bodies include all DNR protected lakes, wetlands, and watercourses not included in Tiers 1 and 2. Tier I consistently supports swimming and Tier 2 lakes are capable of supporting swimming or having significant public use. Based on the site and utility plan and storm water analysis provided by Rehder and Associates, Inc., the AUAR study area can be divided into six unique drainage areas as shown in Figure 10. The areas are defined by topographic boundaries, storm drain alignments and where water discharges from the site. The areas are addressed individually within this section. For most of the existing site, runoff from pavement (parking lots and roadway surfaces) is carried via storm sewer to the receiving wetlands and carries with it the sediment and pollutants associated with these types of areas untreated to the water body. A few areas drain into municipal storm sewer cither via overland flow or via storm sewer connections. Area I, which will not undergo any site plan changes at this time, flows to the existing storm sewer system on Lexington Avenue to the east. Area II drains into Wetland A, which crosses the southern property line in the southeast quadrant. Area III drains to Wetland D within the study area at the northwest comer of the intersection of CR F and Fernwood Avenue. Drainage from Wetland A flows into Wetland C outside of the study area and subsequently flows into Wetland D. Wetland D then discharges to the south through a culvert under CR F. Area IV drains to Wetlands E, F and G. These are linked wetlands, which eventually drain out of the AUAR study area north along Hamline Avenue. Area V flows into Wetland I and then out of the site to the northwest The northeastern portion of Area V (the Building 0 site) is not expected to undergo any site plan changes at this time. Area VI, which will undergo only slight site plan changes at this time, drains onto the adjacent roadways and into cxisting storm sewer at the northeast corner of the study area. According to the Comprehensive Drainage Survey Maintenancc Plan and Ponding Recommendations prepared for the City of Arden Hills (dated May 1999), there are no planncd regional stOlID water ponds in or ncar the AUAR study area. Design criteria for on-site storm water treatment are listed below. . The total phosphorous removal efficiency for each pond or pond network must be at least 65 percent. (LSMP) (3uidant Campus Master Plan Final AUAR and Mitigation Plan - 21 - January 2003 I I. I I I I I I I Ie I I I I I I I. I I . The permanent pool for wet ponds should have a volume equal to or greater than the runoff resulting from a 2.5-inch rainstorm under complete watershed development. (RCWD Rules, adopted August 12, 1998, and LSMP) . Storm water runoff rates for the proposed project must not exceed existing runoff rates for the critical one-year or two-year and 100-year frequency events. (RCWD Rules) . While not a requirement, the RCWD promotes the use of infiltration devices capable of infiltrating the impervious surface runoff from the Minneapolis-St. Paul median storm in 72 hours. (RCWD Rules) The drainage patterns proposed for the expanded campus are similar to the eXlstmg condition, but provide for storm water treatment prior to discharging to any wetland, wherever feasible. Small diversions of water from an existing drainage area may result in order to provide treatment for changes in other parts of the campus. The quantity of storm water runoff will likely increase in some drainage areas due to the increased impervious surfaces proposed for these areas, however, there will be an overall decrease in impervious surface area within the AUAR study area compared to existing conditions. Guidant continues to coordinate with the Rice Creek Watershed District (RCWD) to develop mitigation measures for treating stonn water runoff associated with the proposed development. These measures will include several surface water treatment strategies for each identificd drainage area undergoing site plan changes. The strategies proposed are based on the best available infonnation, but will require further study and discussion with the Watershed District prior to final design. During the design phase of this project, soil and groundwater data will be required to ensure that appropriate treatment areas and Best Management Practice (BMP) designs are selected. To the extent possible, storm water runoff from new impervious areas will be directed into infiltration basins and wet ponds prior to leaving the site. Infiltration basins provide mitigation for the increase in runotT volume by infiltrating storm water and provide water quality treatment by filtering particulate matter from the runoff. Wet ponds provide water quality treatment by settling out sediment and attached nutrients and by skimming floating debris and provide rate control for the water leaving the site. Design of the treatment deviccs will be in accordance with the City and Watershed District water quality guidelines. Design of the outlets for the treatment devices will be in accordance with the Watershed District rate control guidelines. Table 6 summarizes the existing and proposed impervious surface and proposed treatment strategies for each drainage area shown in Figure 10. As can be scen in Table 6, three of the six individual sub-watersheds show an incrcasc in total impervious area, however; overall there is approximately a 2.2 acre decrease in impervious area within the six sub- watersheds. Also by comparison to the existing condition, the proposed condition will reduce pavement surfaces (parking lot and roadway surfaces) by 7.2 acres which is substantial in terms and levels of pollutants associated with pavement versus rooftop runoff. GuiJant Campus Master Plan Final AUAR and Mitigation Plan January 2003 - 22- I I. I I I I I I I Ie I I I I I I I. I I TABLE 6 EXISTING AND PROPOSED IMPERVIOUS SURFACE AND PROPOSED TREATMENT STRATEGY Existing % Future % Area()) Impervious Impervious Description (acres) Surface (4) Surface Comments Treatmeuts\Strategy Paved/Rooftop PavedIRooftop Area Area Areal 9.7 69.0 69.0 None (no changes to 4.1 ac / 2.6 ac 4.1 ac / 2.6 ac existing) Area II 38.5 65.2 56.3 Approximately 3.3 ac Infiltration basins/wet 20.9 ac / 6.6 ac 13.2 ac / 8.5 ac of the existing sub- ponds watershed moved into Area III. (2) Area III 19.2 38.5 49.0 This area experienced Infiltration basins/wet 4.7 ac/ l.9 ac 5.5 ac / 3.9 ac a net increase of ponds approximately 2.1 ac. (2) Area IV 10.6 57.3 33.9 Approximately 2.2 ac Infiltration basin 4.9 ac / 2.4 ac 1.1 ac /2.5 ac ofthe existing sub- watershed movcd into Area V. (2) . Area V 15.5 12.1 38.2 This area experienced Infiltration basins/wet l.0 ac / 0.5 ac 4.4 ac / 1.6 ac a net increase of ponds approx. 3.3 ac from Areas 1II and IV. (2) Area VI 3.4 30.4 32.1 This area experienced None (small drainage 0.9 ac / 0.0 ac 1.1 ac / 0.0 ac a net increase of area connects to approximately 0.4 ac existing municipal from Area II. (2) stonn sewer) TOTALS 96.9 (l) 52.1 49.9 Overall impervious 36.5 ac / 14.0 ac 29.3 ac /19.1 ac area decreases by roughly 2.2 ac. Pavement acreage decreases by roughly 7.2 ac Source: Notes: Rehder and Associates, Inc., site and utility plan and stann water analysis (August 22, 2002). (I) Total acreage is higher than that of the ADAR study area because drainage areas extend beyond the AUAR study area. (2) Numbers arc based on current proposed site and storm water utility plan. The acreages shown are for the proposed condition. See COlmnent column for description of changes in area between the existing to future conditions. Percent-impervious numbers for the existing condition were calculated based on the existing total drainage area, \vhich may be different than the acreage shown. See the Comment column for a description of the changes in total acreage. (l) (4) Guidam Campus Master Plan Final A\JAR and Mitigation Plan January 2003 - 23- I I. I I I I I I I Ie I I I I I I I. I I 18. WATER QUALITY - WASTEWATER EAW: A. DESCRIBE SOURCES, COMPOSITION AND QUANTITIES OF ALL SANITARY, MUNICIPAL AND INDUSTRIAL WASTEWATER PRODUCED OR TREATED AT THE SITE. B. DESCRIBE WASTE TREATMENT METHODS OR POLLUTION PREVENTION EFFORTS AND GNE ESTIMATES OF COMPOSITION AFTER TREATMENT. IDENTIFY RECENING WATERS, INCLUDING MAJOR DOWNSTREAM WATER BODIES, AND ESTIMATE THE DISCHARGE IMPACT ON THE QUALITY OF RECENING WATERS. IF THE PROJECT INVOLVES ON-SITE SEWAGE SYSTEMS, DISCUSS THE SUITABILITY OF SITE CONDITIONS FOR SUCH SYSTEMS. C. IF WASTES WILL BE DISCHARGED INTO A PUBLICLY OWNED TREATMENT FACILITY, IDENTIFY THE FACILITY, DESCRIBE ANY PRETREATMENT PROVISIONS AND DISCUSS THE FACILITY'S ABILITY TO HANDLE THE VOLUME AND COMPOSITION OF WASTES, IDENTIFYING ANY IMPROVEMENTS NECESSARY. D. IF THE PROJECT REQUIRES DISPOSAL OF LIQUID ANIMAL MANURE, DESCRIBE DISPOSAL TECHNIQUE AND LOCATION AND DISCUSS CAPACITY TO HANDLE THE VOLUME AND COMPOSITION OF MANURE. IDENTIFY ANY IMPROVEMENTS NECESSARY. DESCRIBE ANY REQUIRED SETBACKS FOR LAND DlSPOSAL SYSTEMS. AUAR: Observe the jollowing points of guidance in an A UAR: . Only domestic wastewater should be considered in an AUAR - industrial wastewater would be comingfrom industrial uses that are excludedfrom review through an AUAR process. . Wastewater flows should be estimated by land use sub-areas of the AUAR area; the basis ojjlow estimates should be explained. . The major sewer system features should be shown on a map and the expected flows should be identified. . if not explained under Item 6, the expected staging of the sewer system construction should be described. . The relationship of the sewer system extension to the RGU's comprehensive sewer plan and (.for metro areas) to Metropolitan Council regional systems plans. including Guidant Campus Master Plan Final AUAR and Mitigation Plan - 24- January 2003 I I. I I I I I I I Ie I I I I I I I. I I MUSA expansions, should be discussed. For non-metro area AUARs, the AUAR must discuss the capacity of the RGU's wastewater treatment system compared to the flows from the A UAR area; and necessary improvements should be described. . If on-site systems will serve part of the AUAR the guidance in "EAW Guidelines" (pages 16-17) should befollowed. Parking garage drainage and other site-generated wastewater will be discharged directly into the City's sanitary sewer system, which is processed by the Metropolitan Council Environmental Services (MCES) system. The City of Arden Hills has confirmed that the existing sanitary sewer lines servicing the proposed campus have the capacity to handle the additional wastewater volumes required for the campus needs. There was also coordination with the MCES to confirm that their system could handle the additional volumes of wastewater. The proposed campus will add approximately 46,305 gallons per day of wastewater to the existing 52,150 gallons per day for a total of 98,456 gallons per day. While the proposed project will not require additional connections to the sanitary sewer lines located in CR F and Hamline Avenue, the development will require additional connections to the sanitary line located in Fernwood Avenue. These additional connections will be made as needed during the phased development of the AUAR study area. Calculations for determining the amount of wastewater assume that for office/limited industrial space there are three employees per 1,000 square feet, producing 15 gallons of wastewater per person per day. Guidant will work with the City of Arden Hills to detcrmine the manner in which the internal drainagc from the parking garage will be treated prior to entcring the sanitary sewer consistent with Section 1010.08 Subd. I of the City of Arden Hills ordinance. Drainage from the top uncovered level of each parking ramp will enter the city stonn water system. 19. GEOLOGIC HAZARDS AND SOIL CONDITIONS EAW: A. APPROXIMATE DEPTH (IN FEET) TO GROUND WATER: 0 Feet MINIMUM, 90 Feet AVERAGE Source: Water table elevation data was calculated using the USGS 7.5 Minute Series Topographic Map for Ramsey County, Minnesota-New Brighton quadrangle (1997) and the Geologic Atlas of Ramsey County, Minnesota Surficial l-Iydrogeolgy map (l992). APPROXIMATE DEPTH (IN FEET) TO BEDROCK: 250 Feet MlNIMUM, 300 Feet AVERAGE Source: Bedrock infonnation obtained from the Phase I ESA (November 2l, 1997). Guidant Campus Master Plan Final AUAR and Mitigation Plan - 25 - January 2003 I I. I I I I I I I Ie I I I I I I I. I I DESCRIBE ANY OF THE FOLLOWING GEOLOGIC SITE HAZARDS TO GROUND WATER AND ALSO IDENTIFY THEM ON THE SITE MAP: SINKHOLES, SHALLOW LIMESTONE FORMATIONS OR KARST CONDITIONS. DESCRIBE MEASURES TO AVOID OR MINIMIZE ENVIRONMENTAL PROBLEMS DUE TO ANY OF THESE HAZARDS. B. DESCRIBE THE SOILS ON THE SITE, GIVING NRCS (SCS) CLASSIFICATIONS, IF KNOWN. DISCUSS SOIL GRANULARITY AND POTENTIAL FOR GROUNDWATER CONTAMINATION FROM WASTES OR CHEMICALS SPREAD OR SPILLED ONTO THE SOILS. DISCUSS ANY MITIGATION MEASURES TO PREVENT SUCH CONTAMINATION. AUAR: A map should be included to show any groundwater hazards identified. A standard soils map covering the area should be included. The Bedrock Geology (1992) portion of the Geological Atlas for Ramsey County was reviewed for the AUAR study area and does not identify any geologic features (karst topography, shallow limestone, etc.) that will result in potential groundwater hazard conditions. The Washington and Ramsey County Soil Survey (U.S. Dept. of Agriculture Soil Conservation Service, 1980) was reviewed and indicates that native soils within the AUAR study area consist mostly of the Hayden-Urban variety which are undulating to steep, well- drained, moderately coarse textured soils and urban lands; or uplands. Much of the AUAR study area is now considered Urban Land, which includes 70 percent coverage by buildings and pavement, and native soil has been greatly altered by excavation and grading. Figure II shows the location of various soil types in the study area, including slope percentages for each soil subgroup. Soils information for the study area was obtained from the Washington and Ramsey Counties Soil Survey (U.S. Department of Agriculture, Soil Conservation Service, 1980). The following soil types occur in thc study area (slopes are given in parentheses): . 1039 Urban Land . 132B Hayden fine sandy loam (2-6%) . 132 C Hayden fine sandy loam (6-12%) . 860 C Urban land-Hayden-Kingslcy Complex (3-15%) 1055 Aquolls and Histolsols, ponded The permeability of the soils in the area is moderate. Guidant Campus Master Plan Final AllAR and Mitigation Plan - 26- January 2003 I I. I I I I I I I Ie I I I I I I I. I I Small areas of Hayden fine sandy loam with 2 to 6 percent slopes are found within the AUAR study area and are classified as prime farmland. None of this land is actively farmed at this time, however. The AUAR area is not part of any agricultural land protection program, consistent with the area's urban-related land use designations identified in the Arden Hills Comprehensive Plan and the area's inclusion within the Metropolitan Urban Service Area (MUSA) boundary. 20. SOLID WASTES; HAZARDOUS WASTES; STORAGE TANKS EAW: A. DESCRIBE TYPES, AMOUNTS AND COMPOSITIONS OF SOLID OR HAZARDOUS WASTES, INCLUDING SOLID ANIMAL MANURE, SLUDGE AND ASH, PRODUCED DURING CONSTRUCTION AND OPERATION. IDENTIFY METHOD AND LOCATION OF DISPOSAL. FOR PROJECTS GENERATING MUNICIPAL SOLID WASTE, INDICATE IF THERE IS A SOURCE SEPARATION PLAN; DESCRIBE HOW THE PROJECT WILL BE MODIFIED FOR RECYCLING. IF HAZARDOUS WASTE IS GENERA TED, INDICATE IF THERE IS A HAZARDOUS WASTE MINIMIZATION PLAN AND ROUTINE HAZARDOUS WASTE REDUCTION ASSESSMENTS. AUAR: Generally only the estimated total quantity of municipal solid waste generated and information about any recycling or source separation programs of the RGU need to be included. The proposed office/limited industrial uses in the AUAR study area will produce typical municipal solid waste. The project proposer estimated 9,878 additional pounds per day of municipal solid waste will be produced by expansion of the campus. This will bc in addition to the estimated 11,461 pounds of municipal solid waste created per day for the existing uses. Calculations for determining the amount of solid waste produced assume that for office/limited industrial space there are three employees per 1,000 square feet, producing 3.2 pounds of solid waste per day. B. IDENTIFY ANY TOXIC OR HAZARDOUS MATERIALS TO BE USED OR PRESENT AT THE SITE AND IDENTIFY MEASURES TO BE USED TO PREVENT THEM FROM CONTAMINATING GROUNDWATER. IF THE USE OF TOXIC OR HAZARDOUS MATERIALS WILL LEAD TO A REGULATED WASTE, DISCHARGE OR EMISSION, DISCUSS ANY ALTERNATIVES CONSlDERED TO MINIMIZE OR ELIMINATE THE WASTE, DISCHARGE OR EMISSION. AUAR: No response is necessary. There are a variety of hazardous chemicals used by the Guidant Corporation for production. Fresh chemicals are supplied to Guidant to derive the necessary production chemicals. The fresh chemicals are stored in areas separate from the rooms and cabinets where the production chemicals are stored. Spill absorbent are readily available for all chemicals in case of accidental spill. Guidant Campus Master Plan final AUAR and Mitigation Plan - 27- January 2003 I I. I I I I I I I Ie I I I I I I I. I I The production and fresh chemicals stored on-site include the following with an approximate 0.9 tOilS used each month. [This is the total tons of chemicals that are classified as Volatile Organic Compounds (VOCs).] . Isopropyl alcohol . Heplane . DT 4 (organic binder) . Oxyfume . DT 6 (organic binder) . IP AlCyclohexane . Acetone . Dynasolve 210 (Methylane chloride) . Tabcoat 100 The chemicals are regulated by the MPCA, the Environmental Protection Agency (EP A) and the National Fire Protection Agency (NFPA). In addition, Guidant conforms with all requirements for the Small Quantity Hazardous Waste Generators license from the Ramsey County Department of Environmental Health. An Emergency Response Plan is filed with the local fire and emergency response officials. C. INDICATE THE NUMBER, LOCATION, SIZE AND USE OF ANY ABOVE OR BELOW GROUND TANKS TO STORE PETROLEUM PRODUCTS OR OTHER MATERIALS, EXCEPT WATER. DESCRIBE ANY EMERGENCY RESPONSE CONTAINMENT PLANS. A UAR: Potential locations of storage tanks associated with commercial uses in the A UAR should be identified (e.g., gasoline tanks at service statiom). All below-grade storage tanks have been removed from the site. An above ground liquid petroleum storage tank exists on thc site as a backup fuel source for the Building F boiler house. There are no tanks planned for commercial purposes within the AUAR study area. 21. TRAFFIC EAW: P ARKING SPACES ADDED 4.311 spaces EXISTING SPACES (IF PROJECT INVOLVES EXPANSION) 3.331 spaces ESTIMA TED TOTAL A VERAGE DAILY TRAFFIC (ADT) GENERA TED* * ADT is for Guidant generated traffic only. CR F (between Hamline Ave. and Lexington Ave.) = varics from 5,400 and 4,300 ADT** CR 96 (between Hamline Ave. and Lexington Ave.)= 3,300 ADT Hamline Ave. (bctween CR 96 and CR F) = 3, I 00 ADT Lexington Ave. (between CR 96 and CR F) = varies from 9,000 and 6,500 AUf** 1-694 ((between Hamlinc Ave. and Lexington Ave.) ~ 3,600 ADT **Because of significant side street traffic, the ADI varies from roadway segment to the next. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 28 - January 2003 I I. I I I I I I I Ie I I I I I I I. I I ESTIMATED MAXIMUM PEAK HOUR TRAFFIC GENERATED (IF KNOWN) AND ITS TIMING 2005: 1,645 trips onto the campus during the A.M. Peak 7:30-8.30 A.M. 1,474 trips off the campus during the P.M. Peak 4:30-5:30 P.M. 2020: 2,860 trips onto the campus during the A.M. Peak 7:30-8:30 A.M. 2,573 trips off the campus during the P.M. Peak 4:30-5:30 P.M. AN ESTIMATE OF THE IMPACT ON TRAFFIC CONGESTION ON THE AFFECTED ROADS AND DESCRIBE ANY TRAFFIC IMPROVEMENTS WHICH WILL BE NECESSARY. IF THE PROJECT IS WITHIN THE TWIN CITIES METROPOLITIAN AREA, DISCUSS ITS IMPACT ON THE REGIONAL TRANSPORTATION SYSTEM. AUAR: For most AUAR reviews a relatively detailed traffic analysis will be needed, especially if there is to be much commercial development in the AUAR area or if there are major congested roadways in the vicinity. The results of the traffic analysis must be used in the response to Item 22 and to the noise aspect of Item 24. Instead of responding to the information called for in Item 21, the following information should be provided: A description and map of the existing and proposed roadway system, including state. regional, and local roads to be affected by the development of the A UAR area. This information should include existing and proposed roadway capacities and existing and projected background (i.e., without the AUAR development) traffic volumes. . Trip generation data - trip generation rates and trip totals - for each major development scenario broken down by land use zones and/or other relevant subdivisions of the area. The projected distributions onto the roadway system must be included. . Analysis of impacts of the traffic generated by the A UAR area on the roadway system, including: comparison of peak period total flows to capacities analysis of Levels of Service and delay times at critical points (ifany). . A discussion of structural and non-structural improvements and traffic management measures that are proposed to mitigate problems. NOTE: In the ahove analyses the geographical scope must extend outward as far as the traffic to be generated would have a significant effect on the road.way system and traffic measurements and projections should include peak days and peak hours, or other appropriate measures related to identifj'ing congestion problems, as well as ADTs. Ciuidant Campus Master Plan Final AUAR and Mitigation Plan - 29- January 2003 I I. I I I I I I I I~ I I I I I I I. I I A traffic impact study was completed by Parsons Transportation Group for the AUAR study area in July 2002 to determine the impacts resulting from traffic anticipated to be generated by the planned development scenario. The study included an analysis of existing (2002) traffic conditions, future (2005 and 2020) traffic conditions with and without the proposed development (Build and No-Build), and operational impacts to area roadways. The traffic study included an analysis of roadways within and immediately adjacent to the AUAR study area that are anticipated to be impacted by the proposed Guidant Campus expansion. The traffic impact study forecasted future traffic volumes and examined the operational characteristics of existing and future conditions. The primary measure that is used to analyze these conditions is level of service (LOS). The LOS characteristic is an operational comparison of the ability of a road or intersection to accommodate traffic flow and remain uncongested. The LOS of an intersection is generally presented as an alphabetic rating from A to F, with A indicating minimal delays and F indicating significant delays. Intersections are generally considered to be operating at capacity at LOS D and to exceed capacity at LOS E and F. The following text summarizes the findings of the traffic impact study. Existing Roadway Systcm The Guidant Campus (the AUAR study area) is located northwest of the Lexington A venue/I-694 interchange. Access to the site is currently providcd via CR F, CR 96, lIamline Avenue, Lexington Avenue, and I-694. Following is a brief description of these roadways, including how they provide access to the site and existing average daily traffic (ADT) volumes. . CR F is a two-lane collector roadway that runs east-west and provides access to the Guidant Campus on the south via Fcrnwood Drive and two driveways (known as the west and east driveways). The existing averagc daily traffic (ADT) for CR F is 8,400. . CR 96 is a four-lane minor arterial roadway that runs east-west and bisects Lexington Avenue and lIamline Avenue, north of the study area. The existing ADT for CR 96 is 19,000. . Hamline Avenue is a two-Ianc minor arterial roadway. Visitor access to the Guidant Campus is currently provided via Hamline A venuc. Hamline Avenue becomes Snelling Avcnue south ofI-694. Traffic traveling west on 1-694 can cxit at Hamline A venue and gain access to the site; however, traffic traveling east on l-694 can only travel south on Snelling Avenue thereby not providing access to the Guidant Campus. Hamline Avenue has an cxisting ADT of 12,000. Lexington Avenue, a minor arterial roadway, has two lancs southbound, between 1-694 and CR 96. Northbound Lexington Avenue is two lanes, from 1-694 to Guidant Drive North; however, it is only one lane from Guidant Drivc North to CR 96. There are cLlnently two access points to the Guidant Campus from Lexington Avenue - Guidant Drive North and Guidant Drive South. Lexington Avenue has an existing ADT of17,100. Guidant Campus Master Plan final AUAR and Mitigation Plan - 30 - January 2003 I I. I I I I I I I I- I I I I I I I. I I . 1-694 is a four-lane principal arterial interstate highway providing access to the Guidant Campus via the Lexington Avenue interchange. The existing ADT on I-694 is 99,000 (between the Hamline Avenue and Lexington Avenue interchanges). There are two roadways within the AUAR study boundary that provide for internal site circulation - Fernwood Drive and Guidant Drive North. These roadways also provide access to businesses and a park (Cummings Park) north of the study area, just north of Guidant Drive North. Fernwood Drive is currently a two-lane public roadway that runs north-south and bisects the existing campus. Guidant Drive North is currently a private roadway that runs east-west along the study area's northern boundary. Existing Traffic Operations The capacity of nearly every roadway segment is determined at the nodes of each end of the segment. Capacity is hardly ever restricted along the segment itself. In the case of a freeway, the nodes are the interchanges. For an arterial roadway, the nodes are the intersections. It is at these interchanges and intersections where the operational issues and capacity deficiencies of a roadway will be observed. A traffic operations analysis was conducted for the A.M. and P.M. peak hours at key intersections to determine how traffic currently operates in the vicinity of the AUAR study area. Rcfcr to Table 7 for key signalized intersections analyzed and Table 8 for key unsignalized intersections analyzed. Figure 12 shows existing geometries and A.M. and P.M. peak hour traffic volumes at these intersections. Results of the operations analysis indicate that with the eXlstmg traffic controls and intersections geometries, there are several intersections within the project area that currently operate at LOS D or worse during the A.M. and P.M. peak hours (see Tables 7 and 8). Table 7 shows that the signalized intersections of Lexington Avenue/Eastbound 1-694 and Lexington Avenue/CR 96 operate at a LOS E in the P.M. peak hour. The other three signalized intersections operate a LOS D or better. Table 8 shows that five of the unsignalized intersections currently experience LOS E or F. TABLE 7 EXISTING A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS LOS RESULTS - SIGNALIZED INTERSECTIONS Signalized Intersection Existing (2002) A.M. Peak P.M. Peak Lexington A venue & CR F C B Lexington A venue & WB 1-694 Ramps C C Lexington A venue & EB l-694 C E Lexington A venue & CR 96 D E Hamline A venue & CR 96 C , D I GuiJant Campus J\1aster Plan Final AUAR and Mitigation Plan - 31 - January 2003 I I. I I I I I I I I- I I I I I I I. I I TABLE 8 EXISTING A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS LOS RESULTS. UNSIGNALlZED INTERSECTIONS Unsignalized Intersection Existing (2002)* A.M. Peak P.M. Peak Lexington Avenue & Guidant Drive North E F Hamline Avenue & CR F F F Lexington Avenue & Victoria St C F Lexington Avenue & Guidant Dr S D F Fernwood Drive & CR F B C East Drive & CR F B C West Drive & CR F B B Hamline Avenue & West Floral Dr E E *Note: Unsignalized LOS shows the worse LOS for the stopped movement. Proposed Roadwav Svstem In the future, without the proposed AUAR development, the surrounding roadway system will remain the same as the existing roadway system, except for the following planned improvements: . Lexington Avenue will be expanded to two northbound lanes between Guidant Drive North and CR 96 in 2003-2004 as planned by Ramsey County and included in their Capital Improvement Program. . A signal will be added at Victoria Street and Lexington Avenue by 2003-2004 as planned by Ramsey County and included in their Capital Improvement Program. Per discussions with the City, it is also assumed that by 2020, a north-south connection will bc cxtended north of CR 96 to CR 1. Futurc No-Build Conditions Trallic Forecasts Traffic forecasts were determincd for the 2005 and 2020 No-Build conditions. To produce the 2005 No-Build base traffic conditions, existing (2002) background hlrning movement counts were increascd by 2 percent for 3 years. To establish 2020 baseline traffic volumes, the average annual growth rates on roadways around the Guidant site wcrc dctermined using the 2000 and 2020 Metropolitan Council regional travel demand model. The growth rates were than appointed to the base year background tfamC counts to provide future background traffic. Guidant Campus Master Plan Final AUA..H. and Mitigation Plan - 32 - January 2003 I I. I I I I I I I .e I I I I I I I. I ! Projected 2020 No-Build ADT volumes are as follows: . CR F = 12,350 ADT CR 96 = 25,500 ADT Hamline Avenue = 15,000 ADT Lexington Avenue = 21,300 ADT I-694 = 133,000 ADT . . . . Roadway Improvements As discussed under the "Proposed Roadway System", it was assumed for 2005 No-Build that there were no changes from the existing (2002) roadway system except for the expansion of northbound Lexington Avenue to two lanes between Guidant Drive North and CR 96 that are planned by Ramsey County in 2003. Ramsey County also has plans to add a signal at Victoria Street and Lexington Avenue by 2005. The roadway system for the 2020 No-Build was assumed to be the same as the 2005 No- Build with one cxception - 2020 analysis assumed that a north-south connection would be extended north of CR 96 to CR I. Traffic Operations Analysis Table 9 shows the results of the signalized intersection analysis for the 2005 and 2020 No- Build traffic conditions. Similar to existing conditions, all signalized intersections will operate at an overall level of service (LOS) D or better in 2005, except for the intersections of Lexington Avenue/eastbound I-694 ramps and Lexington Avenue/CR 96, which will operate at LOS E in the P.M. peak. By 2020, all signalized intersections, except for Lexington Avenue/Victoria Street, will opcrate at a LOS F in the P.M. peak. TABLE 9 FUTURE NO-BUILD A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS LOS RESULTS - SIGNALIZED INTERSECTIONS No-Build No-Build Signalized Intersection (2005) (2020) A.M. P.M. A.M. P.M. Lexington A venue & CR F C B F F Lexington Avenue & Victoria St A B A A Lexington Avenue & WB 1-694 Ramps B C D F Lexington A venue & EB I-694 C E D F --.- Lexington A venue & CR 96 D E F ' F Hamline A venue & CR 96 C D F t--i-- Guidant Campus Master Plan Final ADAR and Mitigation Plan January 2003 - 33 - I I. I I I I I I 1\ ,- I I I I I I I .e I Table 10 displays the results of the unsignalized intersection analysis for the 2005 and 2020 No-Build traffic conditions. Four intersections will experience LOS E or F in 2005 and 2020. It should be noted that these four intersections also experience LOS E or F under existing (2002) conditions. TABLE 10 FUTURE NO-BUILD A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS LOS RESULTS - UNSIGNALlZED INTERSECTIONS No-Build No-Build Unsignalized Intersection* (2005) (2020) A.M. P.M. A.M. P.M. Lexington Ave & Guidant Drive North F F F F Hamline Avenue & CR F F F F F Lexington Avenue & Guidant Drive South E F E F Fernwood Avenue & CR F B C C D East Dr & CR F B C C D WestDr&CRF B B B B Hamline & West Floral Drive F F F F *Note: Unsignalizcd LOS shows the worse LOS for the stopped movement. No-Build Conclusions The cause of the declining LOS from 2005 to 2020 at many of the intersections is the increase in background traffic volumes and the lack of planned improvements on the adjacent roadways. In order to obtain a LOS D or better at these intersections, additional roadway improvements would need to be implemented. The following improvements are recommended to improvc traffic operations on adjacent roadways: 2005 Recommended Improvements: . An additional northbound left turn lane at Lexington Avenue/CR F. A southbound and northbound right turn lane at the intersection of the I-694 ramps with Lexington Avenue. Installation of traffic signals at Lexington Avenue/Guidant Drive North and Hamline Avenue/CR F. . . 2020 Recommended Improvements: A dedicated westbound right turn lane at Hamline Avenue/CR F. (JuiJant Campus Master Plan Final AUAR and Mitigation Plan - 34 - January 2003 I I . I I I I I I ,I .e I I I I I I I .- I . An additional eastbound left turn lane at the intersection of the 1-694 ramps and Lexington Avenue. If a north-south connection is extended north of CR 96 to CR I, a new lane configuration is recommended to be built for the southbound movement at the intersection of this connection and CR 96. . hnprovements to Lexington Avenue, Guidant Drive South, Hamline Avenue and West Floral Drive are not recommended due to low cross street volumes and signal spacing constraints. Future Build Conditions Traffic Forecasts/Trip Generation The traffic analysis for future (2005 and 2020) Build conditions incorporates the background traffic growth assumptions used in the No-Build analysis plus estimated trips that will be generated by the proposed Guidant Campus expansion. The 1997 ITE Trip Generation manual was used as the basis for trip estimates. With the additional office/limited industrial space to be added to the campus in 2005 (phase I), there will be approximately 1,893 total trips in the A.M. peak and 1,8l9 trips during the P.M. peak by comparison to the existing (2002) and 2005 No-Build 1,541 A.M. peak and 1,401 P.M. peak total trips. ln 2020, (full build-out scenario), the additional office/limited industrial space will result in approximately 3,261 total trips in the A.M. peak and 3,120 total trips during the P.M. peak. The directional trip distribution for the site-generated traffic was determined based on information provided by Guidant on current employee home addresscs and likely travel routes for those employees as well as actual traffic counts and the regional travel demand model that is based on individual cities' planned growth. The 2005 site trip distribution during the A.M. peak hour estimates 47.9 percent of the trips to the campus originate from the north and 52.8 percent originate from the south. During the P.M. peak hour, 59.2 percent of the trips leave the campus and travel south and 41.5 percent travel to the north. The 2020 site trip distribution during the A.M. peak hour estimates that 48.0 percent of the trips to the campus originate from the south and 52.7 percent originate from the north. During the P_M_ peak hour, 59.5 percent of the trips leave the campus and travel south and 4l.l percent travel to the north. Projected 2020 Build ADT volumes are as follows: . CR F ~ 15,100 ADT CR 96 = 26,1 00 ADT . Hamline Avenue = 16,000 ADT Lexington Avenue = 24,400 ADT 1-694 = 135,000 ADT Guidant Campus Master Plan Final AUAR and Mitigation Plan - 35 - January 2003 I I. I I I I I I I .- I I I I I I I. I I Roadway Improvements In addition to the roadway improvements assumed in the 2005 No-Build condition, the 2005 Build condition assumes that existing Guidant Drive North will be turned over to the City and will become a public street requiring the street to be modified to meet the City of Arden Hills public street design standards. These improvements will likely require a traffic signal to be added to the intersection of Guidant Drive North and Lexington Avenue. Traffic signal timing was also assumed to be optimized along Lexington Avenue to account for the higher volumes of traffic being experienced on the roadway network due to the Guidant Campus site growth. The roadway geometry for the 2020 Build conditions are the same as the 2005 Build conditions, with the addition of a north-south connection being extended north of CR 96 to CR I. This improvement was also assumed in the 2020 No-Build. Traffic Operations Analysis Tables II and 12 display the results of the signalized and unsignalized intersection analysis for the 2005 and 2020 Build traffic conditions. With limited public improvements planned between 2005 and 2020 and traffic volumes estimated to increase, the LOS at roadways will continue to decline and the majority of intersections will experience a LOS E or F by 2020. TABLE 11 FUTURE BUILD A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS LOS RESULTS - SIGNALIZED INTERSECTIONS Signalized Intersection Build (2005) Build (2020) A.M. P.M. A.M. P.M. Lexington Avenue & Guidant Drive North A A E B Lexington Avenue & CR F C B F F Lexington Avenuc & Victoria St A A A A Lexington Avenue & WB 1-694 Ramps B C D F Lexington Avenue & EB I-694 C F D F Lexington Avenue & CR 96 D D F F Hamline A venue & CR 96 C D F F Guidant Campus Master Plan Final AUAR and Mitigation Plan - 36- January 2003 I I. I I I I I I I .. I I I I I I '. I I TABLE 12 FUTURE BUILD AND P,M. PEAK HOUR CAPACITY ANALYSIS LOS RESULTS - UNSIGNALlZED INTERSECTIONS Unsignalized Intersection* Build (2005) Build (2020) A.M. P.M. A.M. P.M. Hamline Avenue & CR F F F F F Lexington Avenue & Guidant Drive South F F F F Fernwood Avenue & CR F C D E F East Drive & CR F B C F F West Drive & CR F C C D D Hamline Avenue & West Floral Drive F F F F 'Note: Unsignalized Level of Service shows the worse LOS for the stopped movement. Comparison of No-Build and Build Conditions Table I3 compares the 2005 No-Build and Build signalized intersection analysis. A comparison of the 2005 No-Build to 2005 Build conditions identifies that with the Build condition the intersection of Lexington Avenue/Guidant Drive North will have improved operations with the addition of a traffic signal. As part of the installation of the traffic signals at Victoria Street and Guidant Drive North, the 2005 Build condition assumes that the timing of other traffic signals along Lexington Avenue will be coordinated with the timing of the new signals, optimizing the signals along Lexington Avenue. This will result in improved operations over the 2005 No-Build at Lexington A venue/CR 96 and Lexington A venueIVictoria Street during the P.M. peak hour. Operations at Lexington Avenue/eastbound 1-694 ramp will continue to worsen with the Build scenario and will operate at a LOS F in the P.M. peak hour. An additional eastbound left-turn lane onto Lexington A venue is needed to improve operations at this intersection. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 37 - Janumy 2003 I .. I I I I I I I we I I I I I I '. I I TABLE 13 FUTURE 2005 A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS LOS RESULTS - SIGNALIZED INTERSECTIONS Signalized Intersection No-Build (2005) Build (2005) A.M. P.M. A.M. P.M. Lexington Avenue & Guidant Drive North(l) - - A A Lexington Avenue & CR F C B C B Lexington Avenue & Victoria Street A B A A Lexington A venue & WB I-694 Ramps B C B C Lexington Avenue & EB I-694 C E C F Lexington Avenue & CR 96 D E D D Hamline Avenue & CR 96 C D C D (I) This intersection is currently unsignalizcd and was analyzed as an unsignalized intersection in the 2005 No-Build condition. The 2005 Build condition includes the installation of a traffic signal at this intersection. Table 14 compares the 2005 No-Build and Build unsignalized intersection analysis. As with the 2005 No-Build conditions, the unsignalized intersections of Lexington Avenue/Guidant Drive South and lIamline Avenue/West Floral Drive will continue to expcrience poor traffic operations in the 2005 Build conditions; however, volumes are not high enough to warrant signalization. The unsignalized intersection of Hamline A venue/CR F will continue to operate at a LOS F in the 2005 Build conditions as well as thc 2005 No-Build conditions. This intersection experiences poor traffic operations and has high enough volumes and delay under both conditions to warrant signalization. TABLE 14 FUTURE 2005 A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS LOS RESULTS - UNSIGNALlZED INTERSECTIONS Unsignalized Intersection* N 0- Build (2005) Build (2005) A.M. P.M. A.M. P.M. Lexington Avenue & Guidant Drive North(l) F F - - Hamline A venue & CR F F F F F Lexington A venue & Guidant Drive South E F F F Fernwood A venue & CR F B C C D East Drivc & CR F B C B C West Drivc & CR F B B C C lIamline Avcnuc & Wcst Floral Drive F F F F * Kote: Unsigllalizcd LOS 5hO'\;\l5 the worse LOS for the stopped movement. (I) This intersection is currently unsignalized and was analyzed as an unsignalized intersection in the 2005 1\~o-Bui]d condition. The 2005 Build condition includes the installation of a traffic signal at this intersection. Guidant Campus fvlastcr Plan Final AUAR and Mitigation Plan - 3S - January 2003 I Ie I I I I I I I .. I I I I I I I. I I Tables 15 and 16 compares 2020 No-Build and Build intersection analysis. The 2020 Build conditions show that intersection operations will improve over the 2020 No-Build conditions at the intersection of Lexington Avenue/Guidant Drive North during the A.M. and P.M. peak due to the installation of a signal. However, even with the installation of a signal this intersection will experience a LOS E in the A.M. peak Build conditions as a result of the heavy left turns into tbe site. The rest of the intersections analyzed are anticipated to have similar or worse LOS in the Build conditions than the No-Build conditions due to increased traffic generated by the site. TABLE 15 FUTURE 2020 A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS LOS RESULTS - SIGNALIZED INTERSECTIONS Signalized Intersection No-Build (2020) Bnild (2020) A.M. P.M. A.M. P.M. Lexington Avenue & Guidant Drive North - - E B Lexington Avenue & CR F D C F F Hamline A venue & CR F - - Lexington Avenue & Victoria Street A B A A Lexington Avenue & WB 1-694 Ramps C E D F Lexington Avenue & EB 1-694 C F D F Lexington Avenue & CR 96 F F F F Hamline Avenue & CR 96 F F F F TABLE 16 FUTURE 2020 A.M. AND P.M. PEAK HOUR CAPACITY ANALYSIS LOS RESULTS - UNSIGNALlZED INTERSECTIONS Unsignalized Intersection* No-Build (2020) Build (2020) A.M. P.M. A.M. P.M. Lexington Avenue & Guidant Drive North F F - - Hamline Avenue & CR F F F F F Lcxington & Guidant Drive South E F F F Fcrnwood Avenue & CR F C D E F East Drive & CR F C D F F -- West Drive & CR F B B D D - - Hamlinc Avenue & Wcst Floral Drive F F F F *Note: Unsignalized Level of Service shows the vv'orsc LOS for the stopped movement. Guidant Campus Master Plan Final AUAR and Mitigation Plan January 2003 - 39- I Ie I '. I I I I I -- I I I I I I I. I I Mitil!ation Guidant has worked with MnlDOT, Ramsey County and the Cities of Arden Hills and Shoreview to identifY appropriate roadway improvements to mitigate for traffic impacts that may result from the three stages of development (Phases I, II and III) planned as part of the Guidant Campus expansion. These improvements are identified in the Mitigation Plan included in Appendix E. The Mitigation Plan also identifies the timing and financial responsibility of proposed improvements. Travel Demand Manal!ement In addition to the roadway improvements identified in the Mitigation Plan, included in Appendix E, Guidant Corporation is also working with Metro Commuter Services to identifY Travel Demand Management (TDM) measures that can help to minimize the number of trips generated by the proposed development. As part of this process, a commuter survey was distributed to all Guidant employees at the Arden Hills campus to collect data to identifY current commuter routes and practices, interest in alternatives to driving alone, attractiveness of incentives for using alternative modes of travel, and other issues that will influence the effectiveness of TDM measures that will be successful in reducing site-generated trips during the peak hour. The commuter survey was distributed to 2,686 Guidant employees and a 62 percent response rate was obtained. The results of the survey identified the following information about the Guidant Campus and its employees. . The average one-way commute distance is 16.3 miles and the average one-way commute time is 26 minutes. No employees surveyed are currently using transit. Few Guidant employees are lmowledgeable about transit routes (only 30 percent can idcntify the transit stop location). Almost 50 percent of those that drive alone would be willing to try car/vanpooling_ Almost 50 percent of the employees responded that they could vary their work hours. . . . Based on this survey, Guidant is continuing to work with Metro Commutcr Scrvices to develop TDM strategies that Guidant can implement and promote to their employees. Potential TDM measures being considered include: . Car/vanpooling, including preferential parking spaces Flexible work schedulcs Providing a display of commuter information for employccs, including information on rideshare, transit schedules and bicycling commuting routes Designation of a Commuter Benefits Coordinator (CBC), a current staff member in Human Resources or Facilities Management who can work with new and existing employccs as a source for commuting services and materials Sell transit passes on the Guidant Campus . . Guidant Campus Master Plan Final ADAR and Mitigation Plan - 40- January 2003 I '- I I I I I I I .. I I I I I I I. I I Based on the aforementioned TDM examples, it is reasonable to expect that a long-term commitment to coordinated application of TDM measures by Guidant could be successful in reducing trips generated during the peak hours. Transit Metro Transit routes 224, 226 and 227 provide minimal transit service to the study area. Routes 224, 226 and 227 serve the area in the morning (6:20 - 7:52 a.m.) and in the late afternoon (3:30 - 6:00 p.m.). Service is limited and travels along Lexington Avenue. These routes travel to and from Rosedale Shopping Mall transit center which is located approximately five miles south of the campus. This transit center provides riders the opportunity to transfer to several other routes to reach their residential area. 22. VEHICLE-RELATED AIR EMISSIONS EAW: PROVIDE AN ESTIMATE OF THE EFFECT OF TIlE PROJECT'S TRAFFIC GENERATION ON AIR QUALITY, INCLUDING CARBON MONOXIDE LEVELS. DISCUSS THE EFFECT OF TRAFFIC IMPROVEMENTS OR OTHER MITIGATION MEASURES ON AIR QUALITY IMPACTS. (IF THE PROJECT INVOLVES 500 OR MORE PARKING SPACES, CONSULT "EAW GUIDELINES" ABOUT WHETHER A DETAILED AIR QUALITY ANALYSIS IS NEEDED) AUAR: The guidance provided in "EA W Guidelines should also he followed for an A UAR. Mitigation proposed to eliminate any potential problems may be presented under Item 21 and merely referenced here. The MPCA staff should he consulted regarding possible ISP requirements for certain proposed developments; although the RGU may not want to assume responsibility for applying for an ISP for specific developments, it may be desirahle to coordinate the A UAR and ISP analyses elosely. Motorized vehicles affect air quality by emitting airborne pollutants. Changes in traffic volumes, travel patterns, and roadway locations affect air quality by changing the number of vehicles in an area and altering traffic flow patterns. The effect of the development on air quality was assessed by considering the changes in carbon monoxide, the primary airborne pollutant that emitted from motorized vehicles. Carbon Monoxide Carbon monoxide (CO) is the traffic-related pollutant of most concern in the Twin Cities Metropolitan Area. Concentrations of CO are generally highest at intersections with poor levels of service and, consequently, more idling vehiclcs. Thc MPCA has established state standards (or maximum pelmissible concentrations) for CO of 30 pmis per million (ppm) for a I-hour period (average concentration), and 9 ppm for an 8-hour period. The MPCA I-hour standard is more stringcnt than the fcdcral standard of35 ppm. Thc Environmental Protection Agency (EP A) reclassillcd Minneapolis/St. Paul as an attainment area for CO in 1999. The attainment status is contingent upon the implementation of measures to assure that CO concentrations remain below standards. In Guidant Campus Master Plan Final AUAR and Mitigation Plan - 4] - January 2003 I Ie I I I I I I I .. I I I I I I .. I I compliance with this contingency, air quality analyses of "worst-case" conditions were performed for the study area to estimate the effect of the proposed campus expansion on future CO concentrations at key intersections the study area. These analyses include monitoring of existing background CO concentrations and modeling future CO concentrations at worst-case intersections. Carbon Monoxide Modeling Methodology and Assumptions Carbon monoxide concentrations near the intersections were predicted using forecasted traffic volumes, current and proposed intersection geometries, optimized signal timing, and with computer models, including the U.S. EPA MOBILE5A' emission model and the U.S. EP A CAL3QHC dispersion model. The scope of the air quality analyses was developed based on input from MPCA staff. The modeling assumptions used in this analysis are shown in Table 17. TABLE 17 CARBON MONOXIDE MODELING ASSUMPTIONS Analysis Year: 2020 Cold Start Percentage: 20.6 percent for all traffie Hot Start Percentage: 27.3 percent for all traffic Cruising Speed: Posted Speed Limits Traffic Mix: National Default Values Wind Speed: 1 meter/second (3.3 feet/second) Temperature: -6.6 degrees Celsius (20 dcgrccs Fahrenheit) Surface Roughness]: 108 centimeters (42.5 inches) Stability Class': D Inspcction Maintenance: No Oxygenated Fuel: Yes 8-Hour Persistence Factor]: 0.7 Wind Direction: 36 directions at 10 degree increments Notes: The Surface Roughness, Stability Class and 8-Hour Persistence Factor arc discussed in Guidelines for Air Quality Maintenance Planning and Analysis Volume 9 (Revised): Evaluating Indirect Sources, U.S. EPA, 1978, and are summarized below. 1 Surface Roughness indicates the initial ground level turbulence into which the exhaust plume will be released. Generally, the higher the rouglmess, the lower the concentration. The number used here is conservatively low for the project area (results in a worst-case). Stability Class characterizes the mixing potential of the atmosphere. Stability Class D is used as a worst- case in suburban and urban areas. The 8-Hour Persistence Factor is used to determine 8-hour localized CO contributions, and takes into account fluctuating wind directions, temperature and traffic, which are morc likely to occur over eight hours than during one hour. The factor is multiplied by the I-hour modeling result. J The EP A has recently released the improved MOBILE6 emissions model. At the time of this analysis, the MPCA bad not yet approved regional assumptions for MOBlLE6 inputs. The MOBlLE5A model is still approved for use by the EP A. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 42- January 2003 I .. I I I I I I I 811 I I I I I I Ie I I Background Carbon Monoxide Concentrations Background CO concentrations are needed for air quality analysis purposes to represent conditions without the influence of nearby vehicles. By definition, the background CO concentration in any particular area is that concentration which exists independently of direct contributions from nearby traffic. The background concentrations are added to intersection-scale modeled results to yield predicted CO levels at modeled spot receptors adjacent to intersections. Previously monitored CO background concentrations were used for this project. The Minnesota Department of Transportation monitored background CO concentrations for two weeks (May 21, 1999 - June 12, 1999) at Little Canada Elementary School at 400 Eli Road in Little Canada, (approximately four miles southeast of the Guidant development). Maximum monitored concentrations of 1.23 ppm and 0.82 ppm for I-hour and 8-hours, respectively, were found. For purposes of the 2020 analyses, the background concentrations were adjusted for region-wide increases in traffic volumes and vehicle emissions. The adjustment factor for traffic growth was based on the regional travel forecast modcl. The adjustment factor for vehicle emission was based on the MOBlLE5A emissions model, which incorporates anticipated decreases in CO emissions from motor vehicles due to emission controls. The Holzworth (temperature) correction factor was required to adjust for worst-case winter conditions. The results are summarized in Tablc 18. TABLE 18 CALCULATION OF CO BACKGROUND CONCENTRATIONS 2020 Factor I-Hour 8-Hour Maximum 1999 Monitored Concentration (ppm) 1.23 0.82 Background Traffic Volume Adjustment Factor 2.28 2.28 Emission Adjustment Factor 0.89 0.89 Holzworth (temperature) Correction 2.00 2.00 Worst-Case Background Concentration (ppm) 5.0 3.3 State Standard (ppm) 30 9 Federal Standard (ppm) 35 9 Intersection Carbon Monoxide Modeling Carbon monoxide analyses were performed for the Build alternative in the year 2020 at the following key intersections: Lexington Avcnue/TII 96, Hamline Avenue/TH 96, Lexington Avenue/County Road F, lIamline Avenue/County Road F, and Lexington Guidant Campus Master Plan Final AUAR and Mitigation Plan - 43- January 2003 I .. I I I I I I I .. I I I I I I Ie I I A venuelI-694. These intersections, both signalized and unsignalized, were chosen after consultation with the MPCA because of their low levels of service and their impact on the surrounding area. The No-Build Alternative was not modeled because the 2020 Build Alternative represents a worst-case situation. Forecast traffic volumes and optimized signal timing was obtained from the Guidant Corporation Traffic Impact Study, prepared by Parsons Transportation Group in July 2002. Locations of likely outdoor human activity adjacent to the analyzed interchanges were selected for air quality modeling receptors; Figure 13 depicts the receptor locations. Carbon monoxide concentrations modeled for peak traffic volumes for the year 2020 are shown in Tables 19 and 20. The CO concentrations shown for each receptor are the predicted maximum CO concentrations taken from the results of all modeled wind angles (0 - 360 degrees). Summarv of Carbon Monoxide Studv Results CO concentrations for the 2020 Full Build-Out scenario are below state and federal standards in 2020 for all receptors in both the A.M. and P.M. modeled conditions. The highest modeled concentration is found at Receptor 7, and is 7.4 ppm in the afternoon peak. Full model results are presented in Tables 19 and 20. 23. STATIONARY SOURCE AIR EMISSIONS EAW: WILL THE PROJECT INVOLVE ANY STATIONARY SOURCES OF AIR EMISSIONS (SUCH AS BOILERS OR EXHAUST STACKS)? NO l YES IF YES, DESCRIBE THE SOURCES, QUANTlTIES, AND COMPOSITION OF THE EMISSIONS; THE PROPOSED AIR POLLUTION CONTROL DEVICES; THE QUANTITIES AND COMPOSITION OF THE EMISSIONS AFTER TREATMENT; AND THE EFFECTS ON AIR QUALlTY. AUAR: This item is not applicable to an AUAR. Any stationary air emission source large enough to merit environmental review requires individual review. There will be additional boilers as needed for the heating requirements of new built space. 24. DUST, ODORS AND NOISE EAW: WILL TIlE PROJECT GENERATE ODORS, NOISE OR CONSTRUCTION AND/OR OPERATION? DUST DURING NO X YES Guidant Campus Master Plan Final AUAR and Mitigation Plan -44 - January 2003 I Ie I I I I I I I .. I :2: <i 0 N I 0 N I CI) l- I ....I :J CI) w 0:: I <:l Z ::i w I Cl 0 :2: w I Cl x 0 z .. 0 :2: <n ....Z wO ....I[l) I [l)0:: <(<( 1-(.) I Ql 0> " co co -0: co co co co co co co co co co co co co co co co co co co co co co co ~ ~ <D 0> ~ co ~ ~ "' '" N co "' ~ N N ..,. N <D <D 0> '" co ..,. 0> '0 ~ N N '" N ~ ~ ~ N N N '" N '" N ~ '" '" N " ~ " 0 '" E -[lJ N N "' "' "' "' r-- ~ '" ~ <D 0> ~ "' <0 r-- ~ 0> 0> "'- ~ N r-- r-- a. -" ~ ~ CO r-- ~ ..,. <0 N ..,. 0> N "' ~ <D '" '" r-- 0> ..,. ~ ..,. .e, ~~ "' "' "' .,; ,.: <D <D <D ~ <'i ..,. ~ ~ .,; ~ .,; ~ ~ "' ~ ~ ~ .,; " C 0 0 Cl u en l!! ~ '0 ~ c :I => 0 e '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" '" J: Cl '" <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i <'i .0 '" u ro OJ '0 " N N "' "' "' "' r-- ~ '" ~ ~ <D 0> ~ "' <0 r-- ~ 0> 0> Q) '" '" r-- ..,. <0 <0 ~ "' 0> r-- <D 0> 0> ~ '" "': '" "': ~ '" " '" ~ '" r-- '0 N <'i N <'i <'i 0 0 0 0 0 ~ N ~ N CO 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ " 0> c CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO -0: CO CO CO CO CO CO CO ~ <D 0> ~ CO N ~ "' '" N CO "' ;;; N N ..,. N <D <D 0> '" CO ..,. 0> '0 ~ N N '" ~ ~ ~ N N N N '" N ~ '" '" N C S c ,Q E -<;; ro1o <D <D "' "' "' "' ~ '" 0> '" '" '" r-- '" ~ "': ~ '" r-- r-- a. -c 0 0> 0 <D r-- r-- ,.: <D ,.: <D 0," r-- r-- r-- <0 0> <D "' <D <D <D r-- <0 <D <0 r-- .e, ""U ~ ~ " C 0 0 0 Cl U ro '" ~ " > -0: '0 ~ C => => 0 e co co co co co co co co co co CO CO CO co CO CO co CO co co co co co co co =1= 0> .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; .,; '" ~ u ro OJ '0 '" Q) <D <D "' "' "' CO "' ~ '" ~ '" '" '" <0 r-- CO '" CO "' ..,. ~ '" r-- r-- co '0 N N N '" .,; ..,. ~ .,; ~ ~ co ~ ~ ~ N N <'i N ~ '" N N ~ N ~ 0 ~ <D <D '" '" J: "- J: -0: ..,. '" -0: <n "- ~ ~ <n () ~ () () o<l () o<l o<l I o<l .,; o<l .,; .,; '0 .,; > .,; ~ > ~ " -0: 0 ~ N '" ..,. '" 0 ~ N <( '" ..,. '" <D r-- <0 '" '" 0 >~ N '" ..,. "' <D r-- <0 > N N N N N N '" ~ ~ ~, ~ ~ ~ ~ ~ ~ ~ '0 <( ~ c -0: " ~ " " :;:: ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ro u '" 0 0 0 0 0 0 0 0 0 " 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 - '" C- - - 1:i. .." - - - - ~ 1:i. 1:i. - - - - - - - - - - - - - - - - - <n :.:;;;0.. a. a. a. c. c. c. c. c. c. c. Cl c. c. c. c.Cl a. a. a. a. a. a. a. ~ " Ql Ql .. C .. .. .. .. .. .. .. .. .. .. " " " " IV .= " .. .. " " .. .. 2 " E <) <) ~I~ 'x <) u <) u E <) u u <) <) <) 'x <) <) <) g.x <) <) <) <) <) <) <) '" E '" " " " .. .. .. .. '" " " .. .. " .. " " " " .. .. .. .. .. .. .. J:~ ~ Ll::ill:: --' ~ ~ ~ ~ J: ~ ~ ~ ~ ~ ~ --' ~ ~ ~ ~iI-~ ~ ~ ~ ~I~ ~ ~ iil '" co co N i >-, on ..,. " -" '" OJ r ~ .~ ~ '" ~.~ ('j .-<;:; ::s::s ~'O => c c.'" E '" '" ~ ~;J 2~ "'d:;j "5 c: Qi.': I .. I I I I I I I .. I I I I I I .. I I :E c.. o N o N I en I- -I ::> en w e::: Cl Z -I W C o :E w c x o Z o :E o NZ wO -Ial ale::: <(<( 1-(,) c: o -e - ~ ro~ ~ ~ ~ ., c: Cl 0 E 0 ~ ~ ::l o J: .0 E "- "" ., Cl ro ~ ., > <( ~ ::l o =f ~ c: o '" u ., '" ~ ., ~ c: '" C> c: <( '0 c: 3: 0000 ~~LO~ ..--C")C"')l,{) U)U-)U)(,O '0 c: ::> o ~ u ro '" ~(f')MC") (")(")(")('0') '0 '" Q; '0 o ::;: OC!OON ..--NNM Q) C> c: <( u c: 3: 0000 ~?Gli)~ c: .2 _10 rob ~ c: ~ ~ c: o U cocnmlO r-...:r---.:r-...:05 u c: ::> e 0> "" U ro '" o <:) a 0 l{)..otO..o u Q) Q; u o ::;: '-OO>Q)L() NNN"'>t <0 <0 '" '" J: J: <( <( !J) !J) 0 o <<I <<I I ~ ~ 1<( <( ..-- N (V) "'O:t s:: '- ... '- '- 0 ~oooo_ ::=0.. 0.. 0.. 0.. ~ EB~BB'x ro a..;1,Q) III Q) 4) IO:::Icr: a:: 0::: -..J 0000 Ng~~ ~~~t'--: <.0<01'-<0 ("") C"') ('f') C") <'0 C0 <'I <'? ~~..--"<:t: (")C'?o::tC'? 0000 Ng~~ NT"""COro ~~~o) oqqq L()L.()L()L() N ..-- co ~ I u:i l() It:i.... 000000 ~~~~~OC) M ..-- q LO co I"'-- -.::t '<:t '<:t ~ -.:i -.::t ("') C") M ('I') ~ C"') ('<') (") C"') C"') C") C'? ~ co r--: ~ l[) 'V ..-- 0 0 ..-- ..... ..... o 0 0 a 0 0 ~ ~ ~ ~ ~ co "'<t N Cl r-- N 0 to cD cD CD f'-- r-...: o q q Cl 0 0 Lt:i L() I.[) L.() L.() LC:i ~ ~ q r--: N 0 ..-- ..-- ..-- ..-- N N LL " o <<I ai > <( c: 0000000 0..0..0..0..0..0.01 m Q.l OJ ill Q) Q) c: uuuuuu'x Q) Q) Q) Q) ill Q) Q,I a::: cr: a:::: cr: cr: a:::: -I ai l.()c.or-CO~~N ... ... ... ... (1) .8.8.8.8 c 0.. Cl.. 0.. Cl... BBS8e Q) Q) Q) Q) ~ o:::cr:o:::cr:I N ("') ..q- L() N N N N 0000 N~~N MLO.....N ui-..tuiui C"":!:C"')C")(") MMMM ONcq~ N............,... 0000 N~~N Q')I'-LOt'--; 1'--(01'--1'- 0000 lDLO..oli.i mf'-lf)1'- N~NN i LL " o <<I O~N 0>.........--..-- o 0 0 (; 0.0..0..0.. Q) 1) ill Q) U U U U Ql Q) Q) Q) ,,0::0::0:: 0000000 ~~~N~~~ m..--..--CO'<:tLOr--O (,"}ID~-.:t...t..oMai MC"')C")('o')(V}(\')("J MMM(>')c-r)MM CDa:>CO~~N'<:t ONO.......-NO 0000000 ~~~N~~~ COOT"""T"""lC).......wc lrio:i<cir--.:<cicciu'i~ 0000000 1.01.01.01.0uil{)1.0 COO.......T"""l.()T"""~ O"<:t.......0J.......MO " '" f <<I ai u > ~ <(M"<:tl.f)(O!"-COO)"'C c.................................................r:: o '- '- '- '- '- '- '- ro ..-OOOOOOOiij C'J0..0..0..0..0..0..0.. C Q.l (l) Q) (l) (l) <l.l <l.l ! 'X~~a5a5~~~.s .3a:a:a:o:::o:::o:::o:::", '" o o N i .., 'D " ~ " ~o:: " ~ ~ .g ..... (;j ~.~ c<;l :-:::: :;::;;: w'd ~ ~ 0." Sr:r; u< o co;: " 'do; '5 :::: OC;:: I I. I I I I I I I .. I I I I I I -. I I IF YES, DESCRJBE THE SOURCE, CHARACTERISTICS, DURATION, AND QUANTITIES OR INTENSITY, AND ANY PROPOSED MEASURES TO MITIGATE ADVERSE IMPACTS. ALSO, IDENTIFY THE LOCATIONS OF SENSITIVE RECEPTORS AND ESTIMATE THE IMPACTS ON THEM. DISCUSS POTENTIAL IMP ACTS ON HUMAN HEALTH OR QUALITY OF LIFE. AUAR: Dust, odors, and construction noise need not be addressed in an A UAR, unless there is some unusual reason to do so. The RGU might want to discuss as part of the mitigation plan, however, and dust control or construction noise ordinances in effect. If the area will include or adjoin major noise sources a noise analysis is needed to determine if any noise levels in excess of standards would occur, and if so, to identifY appropriate mitigation measures. With respect to traffic-generated noise, the noise analysis should be based on the traffic analysis of item 21. Odors & Dust Durin!! Construction The proposed project will not generate any odors during construction. Dust normal to construction will occur as a result of this projcct. Dust generated during construction will be minimized through standard dust control measures such as watering. After construction is complete, dust levels are anticipated to be minimal because all soil surfaces will be in permanent cover (i.e., pavement or grassed areas). Construction Noise Typical construction noise will be generatcd during project construction. Noise impacts caused by construction activities in the project area will vary depending on the type of equipment in use, the location of equipment on the construction site, and the operating mode. During a typical work cycle, construction equipment may be idling, preparing to perform a task, or operating under a full load. It may be congregated in a specific area or spread out over a larger area. For this reason, the total noise impact on a single receiver point resulting from construction of the project will vary both day-to-day and hour-to-hour. The range of average noise levels monitored at 50 feet from a variety of types of construction equipment is shown in Table 2 l. These types of equipment are generally associated with site grading and site preparation, generally the noisiest phases of construction. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 47- January 2003 I I. I I I I I I I .. I I I I I I -. I I TABLE 21 TYPICAL CONSTRUCTION EQUIPMENT NOISE LEVELS AT 50 FEET Equipment Type Peak Noise Level Range (dBA) Average (dBA) Scraper 80-93 88 Dozer 72-84 80 Compactor 73-75 74 Truck 82-94 91 Source: From the most recent information published by the U.S. Environmental Protection Agency, Washington, D.C., Noise from Construction Equipment and Operations, Building Equipment and Home Appliances, December 31,1971. The actual noise levels that may be experienced near a construction zone depend on: . The distance between the construction equipment and the receiver. . The type of equipment in use. . The percentage of the time the equipment attains the peak level. . Noise control features incorporated into the equipment. In accordance with city ordinance 630.01, construction activities (i.e., construction noise) will be limited to daytime hours, from 7:00 a.m. to 9:00 p.m. during the week, and 8:00 a.m. to 9:00 p.m. on the weekend. Contractors will be required to ensure that equipment has been properly maintained and fitted with mufflers and other noise controls, as specified by the manufacturer. Traffic Noise Traffic is a common source of noise in a suburban setting and is rcgulatcd in Minnesota by the Minnesota Pollution Control Agency (MPCA) under Minnesota Statute 1 16.07 Subdivisions 2 and 4. The proposed project is located in a developing suburban setting with commercial, light industrial and residential land uses surrounding the project site. High traffic roads such as Lexington Avenue, Hamline Avenue and 1-694 arc located adjacent to or close to the project site to the east, west and south, respectively. A detailed noise analysis was completed to assess existing traffic noise levels in the project area and to determine what effect thc proposed project will have on fllture noise levels. The proposed project will increase traffic volumcs in some parts of the study area. Increases in traffic can rcsult in increascd noise levels, which can be perccived as an annoyance by adjacent residents. The noise analysis consisted of monitoring existing noise levels at adjacent residential receptor sites and predicting future noise levels using computer modeling. Guidant Campus 1'vfaster Plan Final AllAR and Mitigation Plan January 2003 - 48 - I .. I I I I I I I .. I I I I I I -. I I Noise Analysis Noise is defined as any unwanted sound. Sound travels in a wave motion and produces a sound pressure level. This sound pressure level is commonly measured in decibels. Decibels (dB) represent the logarithmie increase in sound energy relative to a reference energy level. A sound increase of 3 dB is barely perceptible to the human ear, a 5 dB inerease is clearly notieeable, and a 10 dB increase is heard as twice as loud. For example, if the sound energy is doubled (e.g., the amount of traffic doubles), there is a 3 dB increase in noise, which is just barely noticeable to most people. On the other hand, if traffie increases to where there is 10 times the sound energy level over a referenee level, then there is a lO dB inerease and it is heard as twice as loud. To approximate the way that an average person hears sound, an adjustment, or weighting, of the high- and low- pitched sounds is made. The adjusted sound levels are stated in units of "A-weighted decibels" (dBA). In Minnesota, traffic noise impacts are evaluated by measuring and/or modeling the traffic noise levels that are exceeded 10 pereent and 50 percent of the time during the hours of the day and/or night that has the heaviest traffic. These numbers are identified as the LIO and L50 levels. For example, an LIO value of 65 decibels means that the noise level was at or greater than 65 decibels during 10 percent of the measurement period (i.e., more than 6 minutes per hour). Regulatory Framework The MPCA is the governmental regulatory agency responsible for implementing regulations controlling traffic noise in Minnesota. Minnesota State noise standards have been established specifically for daytime and nighttime periods. For residential land uses (identified as Noise Area Classifieation 1 or NAC- I), the Minnesota State standards for LIO are 65 decibels for daytime and 55 decibels for nighttime; the standards for L50 are 60 decibels for daytime and 50 decibels for nighttime. For parkland with no overnight uses (such as Cummings Park), NAC-l daytime standards apply to both daytime and nighttime noisc levels. Minnesota Statute 116.07, Subd. 2a. states that municipal and county roads, except in the cities of Minneapolis and St. Paul, are exempt from state noise standards. All the roads near the proposed project site are county or city roads (with the exception ofI-694) and are therefore exempt from standards. State standards are included in this study for reference only and are depicted in Table 22. TABLE 22 MINNESOTA STATE NOISE STANDARDS MPCA State Noise Standards Land Use Code Day (7 a.m. - 10 p.m.) dBA Night (10 p.m. - 7 a.m.) dBA Residential NAC-1 Llo of 65 Lso of 60 LIO of 55 LsD of 50 . ~ Commercial NAC-2 LIO of 70 Lso of 65 Llo of70 LsD of 65 -"-. Industrial NAC-3 LIO of 80 Lso of 75 LID of 80 L500f75 Guidant Campus Master Plan Final AUAR and Mitigation Plan - 49- January 2003 I I. I I I I I I I .. I I I I I I -. I I Noise Level Monitorin!! Noise level monitoring is commonly performed during a noise study to document existing noise levels at selected receptor loeations. Existing monitored noise levels can be used as a "baseline" against which future scenarios are compared. In addition, when studying future noise levels projected with computer models, monitored noise levels are compared to modeled results for existing eonditions to validate the eomputer modeling techniques and results. Existing noise levels were monitored at three sites (Rl, R4 and R7) in the project area on July 9,2002. Monitoring site locations were chosen to represent areas of outdoor human aetivity, i.e., residential yards (Figure 14). Noise monitoring results are presented in Table 23. Monitoring results are presented along with the results of computer modeling for existing daytime noise conditions. The computer-modeled results are within o to 2 decibels of the monitored levels; therefore, the computer model can be considered to be a valid predictor of future noisc lcvels. Noise Modelini; Methodologv Traffic noise impacts were assessed by modeling noise levels at "sensitive" receptor sites (i.e., existing and future residences) likely to be most affected by changes in traffic volumes and roadway alignment resulting from construction of the proposed project. Eight noise modeling receptors (Rl - R8) were selected at existing residential properties in the project area to represent those sites most sensitive to potential project-related traffic noise impaets (Figure l4). Modeling was also performed for Cummings Park, which is located north of the Guidant campus and is representcd by R9. All receptor sites are classified within the definition of State of Minnesota Noise Area Classification One (NAC-l). Noise modeling was done using the noise prediction program "MINNOISE," a version of the FHWA noise model "STAMINA" adapted by MnlDOT and approved by the MPCA. This model uses vehicle numbers, spced, class of vehicle, and thc typical characteristics of the roadway being analyzed. The computations for the proposed improvements were based on existing and projected traffic volumes, existing and proposed traffic speeds, and vehicle class percentages. Projected traffic volumes for peak daytime and nighttime hours one year after completion of the full build out scenario (i.e., year 2020) were used to predict future noise levels. Noise Modeling Results Noise modeling results for existing (2002) conditions and for the year 2020 are presented in Tables 23 and 24. Both daytime and nighttime L[o and Lso are shown for the existing (2002) condition and for year 2020 with the two project altematives: No-Build and Build. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 50- January 2003 I .. I I I I I I I .. I I I I I I -. I I TABLE 23 NOISE MONITORING AND MODELING RESULTS - DAYTIME Modeled Modeled 2020 Modeled 2020 Receptor Monitored Existing (2002) No-Build Build LID LSD LIO LSD LIO LSD LIO LSD R1 67 61 67 62 68 63 R2 68 63 68 61 69 63 70 64 R3 62 57 63 58 63 59 R4 66 63 68 61 69 63 70 63 R5 69 61 70 63 70 64 R6 67 61 67 62 68 63 R7 64 60 64 59 65 60 66 61 R8 61 56 62 56 63 58 R9 55 52 56 53 56 54 State Standards 65 60 65 60 65 60 65 60 Bold numbers are above state standards. TABLE 24 NOISE MODELING RESULTS - NIGHTTIME Modeled Modeled 2020 Modeled 2020 Receptor Existing (2002) No-Build Build LlO Lso LlO LSD LlO Lso RI 66 60 67 61 67 61 R2 67 60 68 62 69 62 R3 61 55 62 57 62 57 R4 67 60 68 61 69 62 R5 68 60 69 62 70 62 R6 66 60 66 60 68 62 R7 63 58 64 58 65 60 R8 60 54 61 55 62 56 R9* 54 51 55 52 55 53 State 55 50 55 50 55 50 Standards Bold numbers are above state standards. * As stated previously, as there are no overnight uses \vithin Cummings Park (represented by R9) nighttime noise standards do not apply. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 5 I - January 2003 I Ie I I I I I I I .. I I I I I I -. I I Residential Receptors (R1- R8) Based on projected traffic increases, daytime and nighttime noise levels will increase by up to 3 dBA over existing conditions with the No-Build or Build Alternatives. Increases in traffic noise between the 2020 No-Build and 2020 Build conditions range from 1 to 2 decibels. Noise levels at Reeeptors I, 2, 4, 5 and 6 currently exeeed state daytime standards and will continue to do so with both the 2020 No-Build and Build Alternatives. Noise levels at Receptor 7 are currently just below state daytime standards and will be at state daytime standards for the 2020 No-Build Alternative, and just above these standards for the 2020 Build Alternative Nighttime noise standards are currently exceeded at Receptors 1-8, and will continue to be exceeded with the 2020 No-Build and Build Alternatives. Violation of the more stringent nighttime standards is common in developed urban and suburban areas, because the "nighttime" period is defined by the MPCA as including the 6:00 a.m. to 7:00 a.m. hour, which is the beginning of the morning rush hour. Park Receptor (R9) Daytime and nighttime noise levels at R9 are predicted to increase by up to 2 decibels over existing levels with the No-Build and Build Alternatives. Build noise levels are predicted to be up to I decibel higher than No-Build noise levels at R9. State daytime noise standards will not be exceeded at R9 for the No-Build or Build conditions. Conclusions As stated previously, it takes a doubling of traffic volumcs to rcsult in a pereeptible (3 dBA) increase in noise. The increase in Build peak hour traffic volumes over No-Build volumes will not increase noise levels by perceptible amounts (less than 3 dBA) compared to No-Build levels. Therefore, no noise mitigation is being considered in conjunction with the proposed project. 25. SENSITIVE RESOURCES EAW: ARE ANY OF THE FOLLOWING RESOURCES ON OR IN PROXIMITY TO THE SITE? IF ANY ITEMS ARE ANSWERED YES, DESCRIBE THE RESOURCE AND IDENTIFY ANY IMPACTS ON THE RESOURCE DUE TO THE PROJECT. DESCRIBE ANY MEASURES TO BE TAKEN TO MINIMIZE OR AVOID ADVERSE IMPACTS. A. ARCHAEOLOGICAL, HISTORICAL, OR ARCHITECTURAL RESOURCES? ...x... NO YES Guidant Campus Master Plan Final AUAR and Mitigation Plan - 52 - January 2003 I .. I I I I I I I .. I I I I I I .. I I AUAR: For an AUAR, contact with the State Historic Preservation Office is required to determine whether there are areas of potential impacts to these resources. If any exist, an appropriate site survry of high probability areas is needed to address the issue in more detail. The mitigation plan must include mitigation for any impacts identified. On June 14, 2002, the State Historic Preservation Office (SHPO) was eontacted to determine whether there were cultural resources within the AUAR study area that could be potentially impacted by the proposed campus expansion. No archaeologieal or historic sites were found in the SHPO datasets for the AUAR study area. Refer to SHPO letter in Appendix C. B. PRIME OR UNIQUE FARMLANDS? ...lL NO YES AUAR.- The extent of conversion of existing farmlands anticipated in the AUAR should be described. fr any farmland will be preserved by special protection programs, this should be discussed. c. NO ...x.. YES DESIGNATED PARKS, RECREATION AREAS, OR TRAILS? AUAR: If development of the A UAR area will interfere with or change the use of any existing such resource, this should be described in the A UAR. The RGU may also want to discuss under this item any proposed parks, recreation areas, or trails to he developed in conjunction with development of the AUAR area. Parks Cummings Park is a city park located north of the AUAR study area (north of Guidant Drive North) (see Figure 2). Thc park is approximately l7.5 acres in size and includes tennis and basketball courts, a hockey/skating rink and warming house, a soccer field, a softball/baseball diamond, playground equipment, a picnic shelter and a trail system. Main access to the park via automobile is currently gained via Guidant Drive North or Fernwood Avenue, with parking available in a parking lot off of Guidant Drive North. With the proposed development, there are plans to ultimately vacate Fernwood Avenue as a public street. This vacation will limit vehicles wishing to access the park to just one access point - Guidant Drive North. A two-lane campus drive will be constructed to replace the existing Femwood A venue. Traffic will be unable to travcl on thc road between the business hours of 6:00 a.m. to 6:00 p.m., Monday through Friday, with the use of sensitively designed control arms. One of the barricades will be located just north of the east-west drive to parking ramps 5 and 6 (see Figure 4). The other barricade will be located just south of thc new Guidant Drive North cul-de-sac. The gate will be activated by guards and able to be opened by emergency personnel. Bicyclist and pcdestrian users wi II continue to be able to access the park via local and rcgional trails, as described below. The proposcd projcct will not result in the acquisition of park prope11y. Guidant Campus Master Plan Final AUAR and Mitigation Plan - 53 - January 2003 I .. I I I I I I I .. I I I I I I -. I I Trails Existing eity trails in or near the AUAR study area include an asphalt trail that runs through the northwestern portion of the study area, connecting Cumming Park with Floral Park, which is just west of Hamline Avenue. This trail conneets to existing asphalt walk/trails along Hamline Avenue and Lexington Avenue. Planned city trail connections in the study area are identified in the City's 1998 Comprehensive Plan and include a 0.7-mile trail connection on CR F from Lexington Avenue to Hamline Avenue, with an extension north to the existing trail on Hamline Avenue. The Guidant Campus Master Plan includes an internal campus sidewalk system that will provide proximate aceess via the east-west City trail that traverses the site in the northwesterly portion of the campus and eventually connects into the Hamline Avenue trail. The proposed campus will not impact any of the City trails. D. SCENIC VIEWS AND VISTAS? ..2L NO YES AUAR: Any impacts on such resources present in the A UAR should be addressed. This would include both direct physical impacts and impacts on visual quality or integrity. "EAW Guidelines" contains a list of possible scenic resources (page 13). There are no seenic resources for which the visual quality or integrity will be impacted by the proposed campus expansion. Refer to Item 26 for more discussion of visual impacts. E. OTHER UNIQUE RESOURCES? ..2L NO YES 26. VISUAL IMPACTS EAW: WlLL THE PROJECT CREATE ADVERSE VISUAL IMPACTS? (IJAAMPLES INCLUDE: GLARE FROM INTENSE LIGHTS; LIGHTS VISIBLE IN WILDERNESS AREAS; AND LARGE VISIBLE PLUMES FROM COOLING TOWERS OR EXHAUST STACKS.) IF YES, EXPLAIN. ...x.... NO YES AUAR: If any non-routine visual impacts would occur Fom the anticipated development covered by the A UAR review, this should be discussed here along with appropriate mitigation. The proposed development will not create non-routinc adverse visual impacts but will alter views of the AUAR study area from the adjacent properties. Although the proposed campus will have some buildings that are taller than buildings in adjacent developments, these heights are deemed acceptable for this site and have been approved by the City. In Guidant Campus Master Plan Final AUAR and Mitigation Plan January 2003 - S4- I .. I I I I I ,I I .. I I I I I I .. I I addition, the proposed development is eonsistent with the City's existing and future land use for this site. Adjacent residences could experience visual impacts such as increased light. Existing vegetation located along the western and northwestern portion of the site between the study area and adjacent residents will continue to provide a visual buffer. Additional mitigation will be incorporated into site development plans that will be submitted to the city, ineluding lighting in the parking ramps that will be shielded and directed downward to minimize glare that could be transmitted to adjacent residences. Additional planting of deciduous, overstory, and coniferous trees will be planted all along the west and northwestern portion of the site. Constructing levels below grade, thereby reducing the overall height of the ramps, will further minimize visual impact of the parking ramps. Ramps 3 and 4 in the northwest portion of the site will be constructed with one and two levels below grade, respectively. Ramps 5, 6 and 7 will be eonstructed with two levels below grade and Ramps I and 2 will be constructed with half a level below grade. 27. COMPATIBILITY WITH PLANS EAW: IS THE PROJECT SUBJECT TO AN ADOPTED LOCAL COMPREHENSIVE LAND USE PLAN OR ANY OTHER APPLICABLE LAND USE, WATER, OR RESOURCE MANAGEMENT PLAN OF A LOCAL, REGIONAL, STATE, OR FEDERAL AGENCY? NO .lL YES IF YES, IDENTIFY THE APPLICABLE PLAN(S), DISCUSS THE COMPATIBILITY OF THE PROJECT WITH THE PROVISIONS OF THE PLAN(S), AND EXPLAIN HOW ANY CONFLICTS BETWEEN THE PROJECT AND THE PLAN(S) WILL BE RESOLVED. IF NO, EXPLAIN. AUAR: The AUAR must include a statement of certification from the RGU that its comprehensive plan complies with the requirements set out at 4410.3610, Subpart I. The AUAR document should discuss the proposed AUAR area development in the context of the comprehensive plan. If this has not been done as part of the responses to Items 6, 9, 19, 22, and others, it must be addressed here; a brief synopsis should be presented here if the material has been presented in detail under other items. Necessary amendments to comprehensive plan elements to allow for any of the development scenarios should be noted. If there are any management plans of any other local, state, or federal agencies applicable to the AUAR area, the document must discuss the compatibility of the plan with the various development scenario studies, with emphasis on any incompatible elements. The City of Arden Hills certifies that its 1998 Comprehensive Plan is consistent with thc requirement set out in 4410.3610, Subpart l, including a land use plan; a public facilities plan (including transportation, sewer and watcr supply systems); and an implementation program. Guidant Campus Master Plan Fina] AUAR and Mitigation Plan January 2003 - 55 - I .. I I I I I I I .. I I I I I I -. I I The proposed project is consistent with the existing and proposed land use plans identified in the City of Arden Hills 1998 Comprehensive Plans as well as the zoning for this area (see Fignres 5 - 7). The 1998 Comprehensive Plan zoning map identifies the proposed campus and areas north and south of the campus as 1- 1 (Limited Industrial District). The purpose for an 1-1 (Limited Industrial District) is to allow only those types and intensities of industrial uses that do not detract from the surrounding area and to maintain performanee standards to keep the intensity of land utilization lower than in the general Industrial District. The Guidant Master Plan proposes the development of the campus within an area currently used for office/limited industrial and maintains a "green" buffer between the campus and adjacent land uses in conformity with zoning and existing and proposed land uses. 28. IMPACT ON INFRASTRUCTURE AND PUBLIC SERVICES EAW: WILL NEW OR EXPANDED UTILITIES, ROADS, OTHER INFRASTRUCTURE, OR PUBLIC SERVICES BE REQUIRED TO SERVE THE PROJECT? _ NO..x. YES IF YES, DESCRIBE THE NEW OR ADDITIONAL INFRASTRUCTURE/SERVICES NEEDED. (ANY INFRASTRUCTURE THAT IS A "CONNECTED ACTION" WITH RESPECT TO THE PROJECT MUST BE ASSESSED IN THE EA W; SEE "EA W GUIDELINES" FOR DETAILS.) AUAR: This item should first of all summarize information on physical infrastructure presented under other items (such as 6, 19, and 22). Other major infrastructure of public services not covered under other items should be discussed as well ~ this includes major social services such as schools, police, fire, etc. As noted above and in the "EA W Guidelines, " the RGU must be careful to include project- associated infrastructure as an explicit part of the A UAR review if it is to be exempt ;rom project-specific review in the future. As previously detailed in Items 6, 13 and 18, existing public water and sanitary sewer services can accommodate the additional needs of the proposed campus. Lateral line extensions from the existing water and sanitary scwcr mains in Fernwood Avenue will be required for the new buildings. Storm water treatment and conveyance infrastructure will be nccessary as described in Item 17. Item 6 describes roadway improvements planned for the Guidant campus. Increased fire and police protection will need to be provided to the area with the proposed expansion. However, thc nccd for these services has becn anticipated by the city and will be provided, as required, as the site develops. As there is no residential land use associated with the planned site development, no impacts to tbe local school system will result. Guidant Campus Master Plan final AUAR and Mitigation Plan - 56- January 2003 . 29. CUMULATIVE IMPACTS . I EAW: MINNESOTA RULE PART 4410.1700, SUBPART 7, ITEM B REQUIRES THAT THE RGU CONSIDER THE "CUMULATIVE POTENTIAL EFFECTS OF RELATED OR ANTICIPATED FUTURE PROJECTS" WHEN DETERMINING THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT. IDENTIFY ANY PAST, PRESENT OR REASONABLY FORESEEABLE FUTURE PROJECTS THAT MAY INTERACT WITH THE PROJECT DESCRIBED IN THIS EA W IN SUCH A WAY AS TO CAUSE CUMULATIVE IMPACTS. DESCRJBE THE NATURE OF THE CUMULATIVE IMP ACTS AND SUMMARIZE ANY OTHER AVAILABLE INFORMATION RELEVANT TO DETERMINING WHETHER THERE IS POTENTIAL FOR SIGNIFICANT ENVIRONMENTAL EFFECTS DUE TO CUMULATIVE IMPACTS (OR DISCUSS EACH CUMULATIVE IMPACT UNDER APPROPRIATE ITEM(S) ELSEWHERE ON THIS FORM). I I . AUAR: This item does not require a response for an A UAR since the entire A UAR process deals with cumulative impactsfrom related developments within the AUAR area. . 30. OTHER POTENTIAL ENVIRONMENTAL IMPACTS . I' EAW: IF TIlE PROJECT MAY CAUSE ANY ADVERSE ENVIRONMENTAL IMPACTS WHICH WERE NOT ADDRESSED BY ITEMS I TO 28, IDENTIFY AND DISCUSS THEM HERE, ALONG WITH ANY PROPOSED MITIGATION. AUAR: If applicable, this item should be answered as requested by the EA W form. No additional adverse environmental impacts are anticipated. 31. SUMMARY OF ISSUES j I I I I EAW: LIST ANY IMP ACTS AND ISSUES IDENTIFIED ABOVE THAT MAY REQUIRE FURTHER INVESTIGATION BEFORE THE PROJECT IS COMMENCED. DISCUSS ANY ALTERNATIVES OR MITIGATIVE MEASURES THAT HAVE BEEN OR MAY BE CONSIDERED FOR THESE IMPACTS AND ISSUES, INCLUDING THOSE THAT HAVE BEEN OR MAY BE ORDERED AS PERMIT CONDITlONS. Guidant Campus Master Plan Fimd AUAR and Mitigation Plan - 57- January 2003 I '- I I I I I I I .. I I I I I I -. I I Item 16: Erosion and Sedimentation Erosion and sedimentation will be minimized during redevelopment of the AUAR study area by the implementation of erosion control measures that will be identified in the final site grading and construction plans. The control measures, including those required by the City of Arden Hills, Rice Creek Watershed Distriet and the MPCA NPDES permit, will be implemented prior to the grading operation and will be maintained until all disturbed areas have been restored. Item 17: Water Quality; Surface Water Runoff The proposed development will decrease the amount of existing impervious surface area within the AUAR study area, thus decreasing the overall surface water runoff volumes. However, unlike existing surface water runoff whieh discharges directly into adjaeent wetlands, surface water runoff generated from the proposed development will be treated prior to entering adjacent wetlands. To accommodate and treat surface water runoff, methods of infiltration, retention and NURP ponds will be implemented. Mitigation measures will be further defined during final design and will be in accordance with the City of Arden Hills and Rice Creek Watershed District requirements. Item 21: Traffic The traffic impact study completed by Parsons Transportation Group for the AUAR study area provided information on anticipated traffic impacts resulting from the campus expansion. The traffic study analyzed existing and future (years 2005 and 2020) No-Build and Build conditions. The existing traffic operations analysis identified that several interseetions within the project area currently operate at LOS D or worse during the A.M. and P.M. peak hours. For comparison to the proposed expansion traffic operations, future No-Build traffic operations were analyzed including planned improvements. The planned improvements included expanding Lexington Avenue to two northbound lanes between Guidant Drive North on CR 96 in 2003 (as planned by Ramsey County) and adding a traffic signal at Victoria Street and Lexington A venue by 2005 (as planned by Ramsey County). Per discussions with the City, it is also assumed that by 2020, a north-south connection will be extended north of CR 96 to CR 1. Following is a summary of the No- build and Build traffic analysis. NO-BUlLD CONCLUSIONS Similar to existing eonditions, all signalized intersections will operate at an overall LOS D or better in 2005, except Lexington Avenue/CR 96 and Lexington Avenuc/castbound 1-694 ramps, which will operate at LOS E in the P.M. peak. By 2020, all signalized intersections, except Lexington AvenuelVictoria Street will operate at LOS F in the P.M. peak. The four unsignalized intersections experiencing LOS E or F in 2002 will experience LOS E or F in 2005 and 2020. The cause of declining LOS from 2005 to 2020 at many of the intersections analyzed is the increase in background traffic volumes and lack of planned improvements on the adjacent Gujdant Campus Master Plan final AUAR and Mitigation Plan - 59- January 2003 I l- I I I I I I I .. I I I I I I .. I I roadways. In order to obtain a LOS D or better at these intersections, additional roadway improvements would need to be implemented. The following improvements are recommended to improve traffic operations on adjacent roadways: 2005 Recommended Improvements . An additional northbound left turn lane at Lexington Avenue/CR F. A southbound and northbound right turn lane at the intersection of the 1-694 ramps with Lexington Avenue. Installation of traffic signals at Lexington Avenue/Guidant Drive North and Hamline Avenue/CR F. . . 2020 Recommended Improvements . A dedicated westbound right turn lane at Hamline Avenue/CR F. An additional eastbound left turn lane at the intersection of the 1-694 ramps and Lexington Avenue. If a north-south connection is extended north of CR 96 to CR I, a new lane configuration is recommended to be built for the southbound movement at the intersection of this connection and CR 96. . . Improvemcnts to Lcxington Avenue, Guidant Drive South, Hamline Avenue and West floral Drive are not recommended due to low cross street volumes and signal spacing constraints. BUILD CONCLUSIONS In addition to the roadway improvements assumed in the 2005 No-Build condition, the 2005 Build condition assumes that existing Guidant Drive North will be turned over to the City and will become a public street requiring the street to be modified to meet the City of Arden Hills public street design standards. These improvements will likely require a traffic signal to be added to the intersection of Guidant Drive North and Lexington Avenue. Traffic signal timing was also assumed to be optimized along Lexington Avenue to account for the higher volumes of traffic being experienced on the roadway network due to the Guidant Campus site growth. The roadway geometry for the 2020 Build conditions are the same as thc 2005 Build conditions, with the addition of a n0l1h-soutb connection north of CR 96 to CR 1. This improvement was also assumed in the 2020 No-Build. With limited public improvements planned between 2005 and 2020 and traffic volumes estimated to increase, the LOS at adjacent roadways will continue to decline and the majority of intersections will experience a LOS E or F by 2020. MITlGA TION MEASURES Guidant has worked with Mn/DOT, Ramsey County and the Cities of Arden Hills and Shoreview to identify appropriate roadway improvcments to mitigate for traffic impacts that may rcsult from thc thrcc stagcs of development (Phases I, 1I and III) planned as part of Guidant Campus Master Plan Final AUAR and Mitigation Plan January 2003 - 60- I I I I I I I .. I I I I I I -. I I the Guidant Campus expansion. The Mitigation Plan included in Appendix E identifies these improvements and the timing of the associated improvements. Prior to Guidant receiving final City approval for each phase of development, the recommended traffic improvements must be implemented. Guidant has also committed to updating the July 2002 traffic study prior to Phase II and III. Item 26: Visual Impacts The proposed campus expansion will alter existing views of the AUAR study area for adjacent residents. Adjacent residents eould also experience inereased light with the proposed development. To mitigate for the potential visual impaets, the existing vegetative buffer along the western and northwestern portions of the site will be enhanced with additional deciduous, overstory and coniferous trees. Visibly compatible building heights will be maintained by taking advantage of the lower elevation in the southern portion of the eampus. Buildings planned for the southern portion of the campus will accommodate more of the capacity needs of the campus and therefore, be taller but will appear similar in height to the existing and proposed buildings and ramps due to the lower grade elevation. The parking ramps have also been designed with below grade levels thereby reducing the overall height. Additional mitigation will be incorporated into site development plans, to be submitted to the City, including lighting in the parking ramps that will be shielded and directed downward to minimize glare that would be transmitted to adjacent residenees. CERTIFICATIONS BY THE RGU EA W: ALL THREE CERTIFICATIONS MUST BE SlGNED FOR EQB ACCEPTANCE OF THE EA W FOR PUBLICATION OF NOTICE IN THE EQB MONITOR. A UAR: In an A UAR document, no certifications as listed at the end of the EA W form are necessary. But, the RGU is legally responsible for the accuracy and completeness of the document andfor properly distributing it nonetheless. Guidant Campus Master Plan final AUAR and Mitigation Plan - 61 - January 2003 I I I I I I I .. I I I I I I -. I I Figure I Figure 2 Figure 3 Figure 4 Figure 5 Figure 6 Figure 7 Figure 8 Figure 9 Figure 10 Figure 11 Figure 12 Figure 13 Figure 14 APPENDIX A FIGURES Project Location-Local Area AUAR Boundary Existing Site Plan Proposed Site Plan Existing Land Uses (1998 Adopted Comprehensive Plan) Planned Land Uses (1998 Adopted Comprehensive Plan) Zoning Map (1998 Adopted Comprehensive Plan) Existing Cover Types Proposed Cover Types Drainage Areas and Potential Surface Water Treatment Locations Soils Map Existing (2002) Turning Movement Counts Carbon Monoxide Modeling Locations Noise Monitoring and Modeling Receptor Sites I L - -, I I I I I I .. I I I I I I I. I I " - , , /, ,j ~ t' ;;) d 4 ~. , /"":'''''. " "T! re.~:~,! I ',. ...::...... \ Ii:.' "'. hL,! . " "OnVF i"" ". i\,u_\.:Sc'.l " l'i~!2 ~ __ dl" KJ'1' ' J Cf .;:,- , ,,' ~'I r-:Q .~','J> ~ ;, ~';J, : \ .""" -..;;. ~~".,.' "- ,"',I (\';".(, .......- :::h' i .1 "!!;: ~ ...../0. '(0' ."" f".., , ~~~N~I0(:' ;I~ " '. .,' ". ----- ,[ \. ", ',;3$.:[ "~I !;r-----,;:::--=0(~..l. , 't ~ " ~ I r~'-J ' I'~---'. -.. ',r IT'p ,- , , I -V ~'--' '! "'-I,' Y ~ A1 .:."" L>..,..' ~ ~ ., 'J ." \ \ "' ir .' 1:1 ~~.)::---,' "i \ f::)--Z I , '-JV ,I \..F J. t:i~ : .,~" .".~,':: I .. / L ~ , .,,~~ ri'I '\-.. ~~it- ..... , ~ PROJECT LOCATION.. LOCAL AREA GUIDANT CAMPUS MASTER PLAN Alternative Urban Areawide Review CONSUlTINC GRo,-,<,.INc. Job No_ 4547 ') " _ I . ).: ", --- )'?"'" ';'" ;;,--';" D_." , ! /, PROJECTJ LOCATION II" 'n" 'hi! p: / ti "T,~~" 'SHORE~W ..~ -vA ~ 1)\ j "- ~ P )~L/,~ .vP- i;:~<'" ! . ,'" i~",_" 'vllE_: - \-. i \. ,( c' .~ ;, ,',<AI.' ON fit"' '. .C,C'. .. , -'--'- i0 iF .. ~':'\J:-", i: v,u _~ of I..,.. ",,- ~I " -." '.... ST. PAUL "" ~M' l'"'\ ~ , . __:::::-"'" ' ~hf: - 'lAW . '.-.. \.x/ l\ ! ~ . .qA ;:..; 1>>1\ ~,,' Y" d~: ;)J i \~\i~fJf::i if.../ .~J",,~ F:;~' " ~ ~-~VJ1A, L.. ,.. ... . ~ ~f '"~" ~ ..~ \.... ~ ~ ! RJ HFl+L~~; , "I k' r. ' '~"t--{ I!J { . , . . , -- , Figure 1 I I I I I I I .. I I I I I I ~ I. ~ I rmD I CUNSULrINGGKOIJl',INC. Job No. 4547 AUAR BOUNDARY GUIDANT CAMPUS MASTER PLAN Alternative Urban Areawide Review Figure 2 ----- - hV'Ir.r.nfn~\1'J1i\Graptlcs\.!541,qrJ - - -- i - - - - - - .,. - '" fT1 Ul ----! ." r o ;U ",. r ~~~ r~j_l L~- HAMLI NE AVENUE -"-L-------------- I I , 'If ~-;; ~~m e.- ~ r\\\1@\-I\\Il\\\\\\1\~\\\\\\~\ ' " 1 \\\~~W\\\\I\~~\l\\ l\\\\-I\\I~\\\\\@' 1 \-I\\I~\\\-I\\I\\\\\ ~@~\\\-I\\I\\\\\I\\\\\\\\I\\\\I\II \\\@_ . ....:..'"~ 0 ~ ;:. 4 " ~ '" r '" " '" I o .. n r. ~ . (1' ~----------: . i~ I 10 :-< I ~p I. UlI1l I' ::0 0~ I' j; ;~ I 0 ~ I ~~ I \.---S . I 11I1I1I1I11I11I\1I111t ~ 0 IHlHtlltH1I11I11I1I c' HIHIIIHIffIlIlI!1I1 .. . " () c: " " :z G) '" 'U ". :D :>< (;) C 0- ",. Z ----! ,- , '" r '" G) -n ~,- ~ ill ~ &~l. , . 6'080 . ~,., '% 1\;)> . " -. 1~ ~ ,I, ..LEX T Nr.TnN I , ----'y--17( . ~ o 0 o 0 .. o ~ "'" " :'. ~ o o -., -. <Q c: .... ()) w ---------;--- __ ".p,,,,,,,,,,,'"'W,c..,,""""l1{;R< - - - .,.- '" [T1 (f1 .., " r o ::u :t> r o ::u ~ < [T1 ~ \,/ U,," ~ J~ D~~ 1= or ::ul-r"o ~ p "~r .~ ~ --- /' 'lI ~'~ - ( r )J /. 4~ 0 ~i~! ~ i:i}~~! bel '- ; 3sL> ~i~ PI " ~ 10~.~. . ~ ~ > \\f ~5;~~ ~ ("") I~ ;>1", ')!j;;i: IIJ. 3 I~a ,., _ ~t, _ I; ~;l~ ~-J ~ h ;:~I~~~ 'I i2;~' r~~, ~!g~~t ~ I ~ " ;. \\~ :=IE:! ~ //' ~ ,. I l:::::J r \ ~ ~ '>;::- / ~ i ;~' Ji~s.1 ", u iil~J ~[ (j, \ ~ ~ ~ II n~~m '"----1 ~ ,(" "0.', I'.., >".' " , . '" l'- '7 _c::- F~V~-(_ g"')G~1 //1 i;\ 1 0;;;e:L w"L-r-t. ~ I)' (;~: ! ~_~!~~ Ii I l\(~~ · J 1!~!~0~~:2' ~ 19,,111 , 1==-___. _,_.;--.- HAMLINE AVENUE I .z. 'v <-- o , I u iii' .~ i I r~~II;,!,g~ ~ ~ '1\':""""" ,'---- ''>' . L~8 ",c" ..... '~~l n '.., .:r: 0 0 ;:, Ie ;::; ,.1 l~t,I''- l '.:' I ~ I I g-I C) ~ \ ~;~iF.' \, )~ ..~ ~ i ~ !' 0 ,i" t4.~." . I tan" rx 0- ::::::;,b ["':1 c , ; . .,G') I ! ~~ , '. ,--- . i ~= ~ l~' 1 ------- (T) I ,[ / \ LEXINGTON AVENUE [ . N o 0 o 0 " ~ <.Q' c: ... <t> .1:0,. z o " " --; m '" " '" o " o '" m o m c r o Z " '" a ~ "" . N *- g -1 -' -- I I I I I I I I I I I I / / ii DI \ \ I I.~ I CoNsULTINC GR.OtJP,INc. Job No. 4547 i ~ I ! I L "- - .....h ".. ~ <t\~:HILLS Existing Land Use Map Legend L C - Existing Land Use SFO: 5hgIB Famiy Delsched Residential SFA:Single FlImilyAtlacl16d ReaidarJtiel f.F: Mu11pk1 Family Resld&ntlal fd-l:MobiI8Homa NC: Neighbol'hood COMl'l'lElorcial CC: Community Commercial RC: RegiOllllI Commereial HC:HighWllyCOIlYenienc$ OFC:Offlca U: Ughtlndustrial Hl:Hllayylndustrll!ll IN: Il'lIlIlIuI~<lna[ SRO: Outdoor Sport/Recreation OSN: N8bn1 ~ Space OSP: Passive Open Space RR:RaiI Road llTl..:UlIIIly VAC:Vacant W8t$l'Ftlalures Righklf-Wsy L- - - - D ,------- ,------- L- - - - m ~ l": Source: City of Arden Hills conditionally approved 1998 comprehensive plan. ............ _. v..~pf,.,~,.,.... ~""tIr<r_~"'INCUy of,;tJmlMlfullcyfl>rI.-Ju.,~, j)o<f......"""""""'u..I.-JUr...l6f> ,JwnJdb..JJrw:bi"""'ClryD/hdeftlllfll. LmdUu~"'mbJ<<I"'dwrg.r, pI<au#ll>tM~I>o<Pbrjw ""..,u;.l....JUnrDaa1p/tD<u. -, -- llIlIor_lIiIlI 2000 EXISTING LAND USES (1998 Adopted Comprehensive Plan) GUIDANT CAMPUS MASTER PLAN Alternative Urban Areawide Review N + o 2000 Feet MepD8Ie: Deeenmlll" 20, 2001 Figure 5 I I 1 I I I I I I I 1 I I I I I. 04. 1 rm!i I CoNsULTING GllOUP,b.-c. Job No. 4547 ~ ~~HILLS FUTURE LAND USE Legend Future Land Use 1______--.1 LDR: Low Density ResidenUal II MDR: Medium Density Residential _ HDR: High Density Residential D MR: Mixed Residential _ NB: Neighborhocx:l Business _ COM: Commercial D MB: Mixed Business L ..1 INO: Industrial D P\I: Public & InstiMional D Park _ Park PreselVe D Right.of.Way D Water Source: City of Arden Hills conditionally approved 1998 comprehensive plan. ~, l1I<a,~n...pt",.Da~"",... ~""1!m_~"'tl.0tf o/MrlmHilbPolir:y/r1rz-J~~ ~~dwl.-J[hMop J.orJJbcdlrrnalb'....CiI,ofMimH,s& UrJU#Dot~_Nbltd."'~ ploaN".,..."'IM~PlmJfr ""P'...L4ttJu...~_ N + PLANNED LAND USES (1998 Adopted Comprehensive Plan) Figure 6 GUIDANT CAMPUS MASTER PLAN Alternative Urban Areawide Review - -- C\lrol..-.-mllo 2000 o 2000 Feet Map Date: December 20, 2001 I .. I I I I I I I .. I I I I I I I I.~ I / I'L.~I ~ l \ \ ) R-1 1-2 1-1 ZONING MAP (1998 Adopted Comprehensive Plan) GUIDANT CAMPUS MASTER PLAN Alternative Urban Areawide Review CONSULl1NG GlUlUr,INC Job No. 4547 ~ ~R~2~~}-IILLS ZONING MAP City of Arden Hills Zoning Districts .~ R-1:SlngleFamIIyRasldentlal =-:J R-2: Single & Two Family Rasidllntial District :==J R..J: TlI'M100uSB & Low DeIl~ty Multi1le Dwemng ~ R-4:MollipleD.\lellingDlslricl ~ B-1:lImltedBuslnessDistrh:;t =-::J "2, G'~ffil B".~~ D"." _ S.3: Service BUBinessDistrict _ B-4:RetaiICenterDistrict _ N-B: N9ighbortlood Business _ &B:GateW8y8uBi~ :==J 1-1:LlmlladlrldustrialDlslrict :==J 1-2: Generallndu51rilll DIBtrict _ I-F:I-FLEXDlslrlct _ CC:CiYicCenlarDisltict _ Rairoad D Right-of_Way n Water Source: City of Arden Hills conditionally approved 1998 comprehensive plan. Neity Limns "Roadway /'\/ Parcel Lines ""'"- n._"'DeI~,.__",IIIiI_ ~.,...Oly",.w.._~ 0hA0d0<~_~""Z-Z Iq~ll<_"'....~of'- HIIIL~~...~",~ ,....+..,.,,~~p~ -- N + - -- 01)'.,(....._ ~lLC. --- 1000 0 1000 Feet - , DlICtIITIber1720011 f.hlDah,: Figure 7 - 00 ~o ::.r;:;:: 13;: O~ o w - - ~ n o ~ " z o Q o c " ~ :>> .-- -< m :::0 :z: :>> -< < m c :::0 CD :>> :z: :>> :::0 m :>> :;;; Cl m :::0 m < m :;;; ~~ j;en ~:j s::<: :>>C> en -<(") gjo ~n:i :>>::tJ :z: :>>.... !j;=t; :::0111 en - - - - - . - - - - - - I - - - - H:\P!annlr>]\4547Ifiraptlcs\4541B/O on o c: '" (') [TI '" on ~ )> '" (') I =i m (') --< on :is m (j) .... I' ." r a :0 J> r ill --< r ill ;:! )> " o ili ~lJe ~ " < 0 m ) '"- ~ ill ;:! )> 15 4 " ~ '" '" --< r )> " o (') a c z --< --< :0 a J> o ." . .11111111111111111/1'.::: . . . . . . . . .. ....:.liililllllllllllllll..:...:::..::.:.....:: '.~:-1lnJllrlllll'I~J1HI..'-" 1'lill'I'I;I'I:I'I:il;iil',:I': . . l ::1 .~. II, '! ,1,1,. . 1IIIIIIiIllIi:;::lliil 0 ::1111111111111111111111. ~-~-~-~~~l . , , I I ] , I , I I , ---~~.1 . . :<1!lHI :1~I~i[I~~lj!~ ,')~iOOJ:: ' , . . . .1. ,..' . . .1: ~ -l~J ..Il/j1. ..... .lltlI " c :;: :;: z '" Ul --c )> :0 '" ~ .....1:0.'... . ':"<b<<" ..G..... ".,;," ""." . "'. . "', ,. ",'" rX 0- ",Ul --< . . . \ "di- il'l j . . ,I, .. ""'I' "Ie '. I '. I . , 'L 'I' .~ I ill ;:! )> " * 0 011 D ~ '" -nUl OI ;u)> --c 0'" . . ow, . N ---; )>)> r '" .. m_ m r 0 0 _;u )> '" 0 c:;: :0 ", 0 0 r", .. ---; " _--c c " .- '" Z r 0 r", VI '" 0)> )> ", 0:0 I " --c " 2 0 -< 0 n--c 0 2- )> o;u r VI " "0 2 <0 )> :0 VlC 0 ~ "'x 2 Ul 0 ~ ;u- '" ili ." )> " :;: Ul 0 2Ul :0 --<)> " ---; :0 OC )> -<---; )> r ", :0 VI "'" --c )> Ul "." VI ",. 2 --< )>)> r z 0 <" )> >:0 '" VI "'''' z n", :;:Ul '" ~ N --< ", VI ;u-n ~ I 2~ . 0 "'''' ;" . )>;u - '" --<- - -+ 0 ." " _2 m "'--< ... > n -. 0 n ~r 0 CQ > ~ :0 mc -< " '" N'" > s::: )> :0 "' Ul '" " fi: m '" "'Ul ;u r Ul ,. '" '" n ,. VI ;u n Cl<> .. '" ;u Ul ", VI - 00 n ~o 0 ~~ ~ N.l>. C S--J ~ Q o o .' Z n - - - :>> r- --I m :;0 :z: ~ --I < m C :;0 OJ :>> :z: :>> :;0 m :>> ::E o m :;0 m < m ::E G)"b C;u 00 ~"b --10 S::ti) ~~ m :;00 LlO ~~ ~;u j;...... :;o=ti ITJ CI) - - - - - - - - - . - - - ; - - - h\P!Qf'in!Il(j\4547\GnJphlcs\4547/J/1 (f> o c: '" CO m ;U (f> " ". ;U CO I ..... m CO ..... (f> ~ ;:J ,. " " ~ ;:J ,. " " il'i ;:J ,. " " ~ ... ~ ,. z " ,; '" -" ~ ~ HAMLI NE AVENUE v~ ~ ... ~ ,. z " 11\ ;:J .. ~ ~ <y '- o " '::. .:':::~~:.~~~~.:":. >. :>J~~t).. ::::-: ::.:-:.:-:s.:::::!ri'':':,'' .:>L:. .' :::::.. :'.~.: :':' U~:.....:.::: .':.::il:iii\!!:r:::.:.:;:: :::;,:. .'.::::: :~::. . .. ..,'.......',.,'....,..... ,',k'" ." ""', ..,.. ..........:....... :::1>: ....... .' . ~ LEXINGTON AVENUE 11\ ... liD ~ ~ * D ,. " " -"Ul ~. p m OI ;0,. . . '0 0'" '" '" r m_ m r ,"Ul '" 0 )> CJ:: ;0 '" ... ... 0 '" -'0 C " )>)> r " z r," Ul '" . '" _;0 ,. '" 0;0 I " 0 0 r," z " "- -< 0 0 0 '" D z_ " .. 0,. Ul 0 r "0 " '0 ;0 " UlC D "" Z Ul 0;0 '" -" D " " <0 '" 0 '" ZUl ;0 '"X ... ;0 " oc )> ~ ;O_ r '" " ;0 '" '>.;. J:: " Ul '0 '0-" '" " ..." z ... "" r -<--< D Z <" " '0'" '" " '"'" z ,", J::Ul 0 ";0 '" '" '" I :.. N z~ "'" '" '" --<- ;0-" -" " - '"'" " '" " . '" ";0 " ~r 0 :1- " " ~ ;0 " .bC " '"--< '" " "m " "TJ 0 '" Ul ;0 '" " tQ' --< '" OUl ;0 " Ul '" " " " Ul c:: CD ;0 " ~ r '" ;0 '" Ul '" A Ul (Q - _0 n ,"0 0 $~ ::i N~ ~ 2~ ~ " o c ~ Z o - - -- It )>- r- --l rn ;;0 Z )>- --l <' rn c ;;0 OJ )>- Z )>- ;;0 rn )>- ~ CJ rn ;;0 rn < rn ~ QI:J ~~ )>-- :':j~ ~G') ~Ill rn):.. :::0:::0 ~~ Zen ~):.. )>-<: :::OI:J "1:J o n:: <: -t );;: r- en c:: :::0 ~ (") 111 ~ n:: :::0 ::ti ~ 3:l 111 <: -t r- o ~ :::! o <: en - - - - /1:V'lOllnlnqI.4547\GrG:xJcs\451lEIJ Of> o CO ;0 n en ;0 m =c Cl m '" ;p. Z o ;p. Of> Of> o n s;: --< m .Of> z n '" m (j) "'" " r o :;0 )> r Cl ::u ~ < m If; ;:! l> " C / I L-:---= '" .,- I - - - - - - t - - - If; ;:! )> " '" ." HAMLI NE .-, ~ - l> _::0 ITl -,<l> , I - I I GOt @*@ I V ","i'> I 'U '" '" 'U '" '" -u -u -u r ;0 ;u ~ 0 ~ ;0 0 0 0 '" 0 )> --< )> --< --< --< '" 'U "" m "" m m m '" "' z --< z --< z z z z z ;0 )> --< )> --< --< --< '" --< '" z z '" ~ ~ -< m '" )> '" m )> )> )> r r r r '" '" '" '" '" 0 0 ;u .. '" n -u c c ,. m --< ;0 0 z 0 z z --< r m :;: ." Z 0 0 z r )> n ~ r c ,. ,. ,. )> z --< ;u ;0 '" z c z --< r -< -< "' '" 0 '" ;0 0 z '" )> n n :;: ~ ,. I -u --< ,. --< 0 0 z z z 0 z C> '" Z "' ,. '" r --< po )> V> ." 0 ~ z z z tCi" ." ~ r I:::; --< --< ~ '" ;u )> .... ~ Q 0 z l> _::0 _1Tl _l> I~_~ ~-~ If; I --< , ~ ) ~ I , f _..../ " fl /1 I -~ I ~~ I 8 (~ I D I C I z I I' Z '" J i ~ Gr' CJI: ::u i:2 ,~_-\--. Cl ~i - If; l ! ;:! ,., ~ I I I I I I I l~ :1 'I " I I ....... 1'~ ) ~ , ~ / "" I ( / /"~- 1....... I ~ ,. z c IJj ;:! ,. z '" l> <::0 ITl l> "', FERNWOEJD AVENUE t o - - cJ Z o :;0 "'" :I: " c: ~ Cl )> Z "'" Cl ::u ~ < m L. .... -, l> _::0 ITl l> --- f ") , .- _-_J 6 , -.., ,.. > ( ". J <::0 .J - fT1 ...- l> .... LEXINGTON AVENUE If; ;:! )> " c '" " ~ o " o " .. " ~~ ." . . + ~ " " I I I I I I I rmIi I I I I I I I I I I CONSULTINC GaoUl', me. SOILS MAP GUIDANT CAMPUS MASTER PLAN Alternative Urban Areawide Review Figure 11 Job No. 4547 CSAH 96 I I I I I I I I I I I I I I I CSAH 96 Sl I I 4W Cou Road F ;-- .-~ "'0', Q>~ 8~ ~--- ., t..'35 (233) . It;f':'2~1\4~~l,''''''100(215) {OJ o..t., t,.. r.;.ali~.~~g -'-~'N 3;;;'& 'fl'N;:!; !3'2'~ ~ fS~ ~-t..6 (3};;;;: '"'L141flJ"o j "" l. ....1:39(4C11.,J .......i43{336i {3-)9ol..t t?42)3OO-to 1::6fi4 ~ fl ~ !\ I A AM Turning Movements (PM Turning Movements) Guidant Traffic Impact Study Source: Parsons Transportation Group traffic impact study (July 2002) ~ CONSULTING GROllI', 1Ne. EXISTING (2002) TURNING MOVEMENT COUNTS GUIDANT CAMPUS MASTER PLAN Alternative Urban Areawide Review Figure 12 Job No. 4547 I LEGEND Carbon Monoxide Modeling Location AUAR Study Area I I I I I I I I I I I I I I~ ~ Cu",vu,""c",,", I,c. I CARBON MONOXIDE MODELING LOCA TIONS Figure 13 GUlDANT CAMPUS MASTER PLAN Alternative Urban Areawide Review Job No. 4547 - - . Tue Dee 17 17: 23: 46 2002 ~ n ~ ~ ~ d ~ o ~ s= [/). ~'j, . "<'<':>".. >';~r ~.~ .~. '~ . ".:..:;;;":,...\',. (,:::,",\ . .' .,' ... .,;:.<,. . ,. """:":"}'''''>'':'~;~' : ..... .. ',:1 <, :;>,~,".. ',F ....;"...'; ';:: .:' '..,' "":'-< ,\ ;j;<;i"~/' ..:':;%:;,: 1 ..' . ",:,; ~': ":,,..:,,:::,,~:~:>,. .',,~:.,. '\<'~;i': :'S:.. . ,.::: ,r ~i\;'J ~;~ . . ~,./ ~} ...,' . .. ~I" ." C \...... ....: 'l.."> . . ;..____..: ..---:..: "1 .. . ,..'F', '..2'..::: ':. .. 'I.~. .".' .",,'... ""c: ,'. ;'. --::, .. , . !"::<:.'" 1 '1.;:;1 , i ,{,:H:: I i. :. ,:.,~,~ . .... ;'........ ,: .-;:~ , ..\ ~i 'J '>~::;i'" ' . . :' i '. '. . .. ,\ ' -- , ': ,.!;),~:! .;.. ~:"l (/(( I~I I . ( ! :: "'. ,'; . "", ." .. i..'.. , ,~< ',. :~". i ,-,,/, ;"-'~ .- :J' I "."', t,. ,': ',';, i .. I , . .c em:''> '. . -- .'.. ,... :.:" .,:~ '>: :; "'. <:; :!<.' ,.!:.r;, :... <,':' I..!" I:, '.' , . >.':,: i~.; .... ..-' ..' :.l',~' ..:'.. . .', ,":., ,....' :::"r; ',-, t:~.! ~(. ~"~ ~ ~ r ~ s= Z ~ [/). ~ ~ t'Ij r ~ o ~ ~ '-'. , . ... P-',~ '0' 1 ?O '" 2: " I"i, ~ H- 1 v I .~ ~ ii' !II I, ,"., :c: . I . ...-- :'.;'" ../. " -- ,..'.... -- '.,.. ~N .... ,"" " .. i ~ '. .. : ) . ..' <',;'~: . ,,~;" " '. . : '. .....Ie., . . . }--" \ . . . ,.. \1 . \/ . '\Z\~c::~ .' . ~ :. . . \"'" ". .. ' ,...;: :T<!I '.: .-'. '.' ..n. n'. /.:,'.. /' ". ~.... . "..' i.... .....- .\ , . ..' .,.' I ..... ". . { . ..; c.".', '''''' . ... ." . ' '" . j ..' . I,.. ... ..:"".:~,:< . \; . . :'... .n'..... '.'- .- .." '1.__.--.__:.' ..-./' , , --.... ,. . ",~;'= .. /' . ." 'T,. .;,;' ' --.... ", '.:" . ' ," ." ." '.-." : ..' '., ,'. " .. . 0, " , - C:; . i ..- .:.. ,'.... .- :' , ,~_/f 1 :j~- " ". i,. ~;L ..:2\ ..:: ....i. n.., ".' ",. .m:''';....--' -- .... . . ,'. /1.,.,..".....:..:...,...,:..... .'., ....--: .:',:--T..:.:..'::':' I .. '"/ .. il: ,HI .' "1" . ~~ II In fl., I~I :.--..", ~:~ , ;; ::. 'f1:~ .- ";:>\:::'~''': , ;\ '.. 'i ..~ ...c."..,' : ,',: .,;i1 !, ". .-t,;;:. . ;.-- I \\ i ::'.: ,/7;'" :,: ..,," .. <, jit (. .. .' .. ., :' ...,i; '."". . . C''-''''..C ,J__'..~ , 0~~ . DRAFT 1/9/2003 Ramsey County Public Works Facility Total. Estimated Project Budget GSFI$GSF COST ESTlMA TE 1. CONSTRUCTION & SITE DEVELOPMENT: . BUILDING A . OFFICE BUILDING Ramsev County Public Works 42,504 5,199,654 Arden Hills 3,974 486,152 Mounds View School District 2,643 323,327 Total Building A 49,121 @ 122.33 6,009,133 BUILDING B. HEATED VEHICLE STORAGE Ramsev County Public Works 70,412 5,423,245 Ramsev County Librarv 963 74,172 Arden Hills 17,070 1,314,759 Mounds View School District 5,136 395,583 Total Bul/ding B 93,581 @ 77.02 7,207,759 BUILDING C . EQUIPMENT MAINTENANCE Ramsev Cou ntv Public Works 50,378 3,606,189 Total Building C 50,378 @ 71.58 3,606,189 BUILDING D. UNHEATED VEHICLE STORAGE Ramsev Countv Public Works 27,867 1,461,353 Ramsev County Librarv 995 52,178 Arden Hills 2,984 156,482 Mounds View School District 2,554 133,933 Total Building D 34,400 @ 52.44 1,803,946 BUILDING E. SAND & SALT STORAGE Ramsev County Public Works 30,000 1,000,000 Total Building E 30,000 @ 33.33 1,000,000 SITE WORK & OUT BUILDINGS 257,480 Ramsev County Public Works 4,898,577 Ramsev County Librarv 37,083 Arden Hills 574,487 Mounds View Schaal District 250,306 Total Site Work & Out Buildings 5,760,453 EQUIPMENT Ramsev County Public Works VJ,-rt,trYJ/<, 1,200,646 ~ Arden Hills 99,952 Mounds View School District 16,193 Total Equipment (Includes 5% Contingency) 1,316,791 ADDITIONAL REDUCTIONS Ramsev Countv Public Works (769,753) Arden Hills (88,261) Mounds View School District (37,538) Total Additional Reciuctlons (895,552) Total Construction & Site Work (Includes 15% Contingency) 25,808,719 2. Furniture, Fixtures, Equipment: Ramsev County Public Works 373,200 Librarv 12,400 Arden Hills 75,700 Mounds View School District 40,800 502,100 Contingency (15.0%) 75,300 Total Furniture, Fixtures, Equipment 577,400 ~3. Telecommunications/Data 159,100 Contingency (15.0%) 23,900 Total TelecommunicationslData 183,000 4. Professional Services: Architects and Engineers: /bev Phase 1 - D l> ~ est 6/J /J'lAJPn-eNr. 794,900 , Phase 2 (To Be Determined) TBA Preliminary Design Services - TKDA 91,540 FF&E (8%) 46,190 Design Services for Army National Guard 442,900 Total Professional Services 1,375,530 5. Site Acquisition and Preparation: i. Build ing Demo. 258,369 . Army Core of Engineers 15,000 ~ Cement Slab Removal (To verify) 388,000 " Hazardous Material Removal 317,365 " 978,734 Contingency (10.6%) 103,750 Total Site Acquisition and Preparation 1,082,484 6. Miscellaneous 100,000 Contingency (5.46%) 5,460 Total Miscellaneous 105,460 7. Project Management: Property Management 90,372 Inclusiveness in Contracting 100,000 Builders Risk Insurance 25,000 Traffic Engineering 10,000 Special Inspections 235,100 Soil Borings 17,000 Construction Drawing Printing 100,000 . Conditional Use Permit 10,000 Pennits and Fees 10,000 SAC Charge 129,000 726,472 Project Contingency 1,084,300 Total Project Management: 1,810,772 Total Estimated Project Budget $30,943,365 AtrAe'l-ft1A.JCNT A: e ." ~ "'D(n"'Uc)O(f.lC/.l-ltD5''''U~ a~CDOOO"Cf.'lCno_ ';;'03 [ii =::;1: 3llic"O s: n C");::+;:; - to iii' n CD !!!. CD 'lll II' -io[W o~ g.=m(i; ~~; 3' a 0 1d ~ ; :!.~ acE ;:u ;;J s:!,g III lD~lDo.-00"'Q-'0CDI>>(Il 2' ~ ~ "c:::S I'D ii;ll:" =::s ~ Q. a cg m:g ~ a!!::i" 5"~ a 4J~'~ (I)~~ g~'~03" 02. 2,< ... 5' tit ; g CD !! ~ 2.tJ:l ~ !:t a OJ i: -~ CD a ~ ~ a 5" i3 ~. CD ~ 0' it ~ ~oo_ __ UtO CD..w.....NO(D ~ ;4~.!O!IJ~!A~?!J'!='9 (oINoNNWO-...lOOOW ,flo.U)WWcg....NoOOO..... OOOOOOOOOON ~ ~ !::. ~':;--~",!:: w N(JI~....Cfl WU) ..... 00000000000 J~ . ~- ....... .... w w .-....,...........WN~ ......cn""""CD to)Q 00000000000 i )-;~.,., ~;;i N ~ooooooooooo .... J '" 1.J ~ :,.. l>.) No Ch CD OU)NNoW "" W 00 :"'''''''''''''''''''''''''''' '" ~ .. ..... 0.... No en ....N CO......C,o) '!. :"00000,;":'" _ Ch.....U)Ul CD CD..... ..... . oOO'7oo~oooo Ii ~.. ....(11 .... to ~ u,.:,....:........0, ........NNCD.... Oo,,?,ooogoooo t J '" .. g 000,00000,0000 ~ ~o_ _ '" _ CION........O.....W....NOilD ~ ~}fJppp;4Y.p~Ulpp (oIOOooo.....ooow 0000000000..... oooOOOOOOON ,.. ;:: in ng 0= ~~ l:".::l ~~ <00 ~ 0 ~0 (i~ -- ..~ ~:; jj;'~ n- ~ ~ ~ o o ~ ,~p'j .....'" 000 00 !" '" ii ~if~~~~ ;;'::SN33=.o _ ~~ CD '< Q. c !!.:JQ.;:;Jo5'c;' (l)tgO-OCD:;::;: ;;:~;SJ;~g :b,'<!:30 3'lll n-:i;;!t~;;;O::l -g ~!!: !.:::::I' Q. _, CD -. CD "'D e.~~::j:i' ; ::t-:;:vO(ll "'D g CD< ~ ~ ~ 3 ~ ~ :r; 0 -. !:!: I:l < -<:' 0 ~- ~ "'0 - .. ~ .., .. ~ o' ~ ~ "''"' '" ClOlo............... ~ ~:'"_co~~ UO.cnWOi2o OOi2o co..... 0i20 OUlOOlQ ~ :\' a :?~~ ~m 0go!t nUl ~'~~r [g' ClI) 5' ~!. ;;tfr~At utCl> ~ <--2 I>> CD - -. C ::l < 4'2 CD 0.- out ~ m:;: if 0' cg"tJ~!'! ~.;. en ~ S' 0... CD tit Gl ; =l < CD CD .:c o.....ZJ cnZ (tI ~ CDI>> UI ~ S.S- - n ~ ~!!. '" o ~ a .... '" c .. i" .... ~ ;; nn 00 ~ 3 ..... g.3 0<00 ilCTI:!. _~n ....n. CD'<:!' iii-:l:g n ~0 00_ :I ~:;' 3-_ o . ~ ~r '" o ~ ~ .. ... ~ - "'~ ~ ~Wy>> 00_ 00 00 !>' -n !; o~. o~ 0' ~~; et~ !! ~~~ 3 ~ a S:-:l:~ ij}P'm ~ ~.c ".!:E. s: "'D ~ 3 ~ ~ In a. .ll' o -;;' 3 ~ :< ~ '"' ~'"' _ ::'!'J ..~ 0", 00 .~ :: ~ J ~i:~ ...., 0 00 00100 00 00 10 ~~i J ;"Ioo~t: ~ 01:: t J )i:~ co ~~~~:g~ ~o~o~ 00 ~gg L Jm," J.d L J!l 10 .t~~i~ ~oim 10 10 ~~~~~~ ~o~J 10 .~i 10 1",,,,,,,,,, .too 10 1", ~]:l~ ~_;;:~ CD..... (01...... 00 00 100 100 1", 10 q-="'''P' !" ....(.011\)1\)01 ............,0..... 00000 ~_..~ '"' ~ ..1",,'N 1\)(" OI.....(oI.CQOI\) 00000 ~ -1-'"''"' '" o 0.....0).....01 ~ }It,? _ ~~!D.P'!D ....0 "........(,100(.01 dJo OIdJoom 00 OOlOOU) ~ '" '"'00", . 9~~ oo~oo o~~~ ~ - - '" - w i;o o '"' 0000 ~... .... .""(0(0 . ~_O)~.....~ U)"'(1IU) g:g~g . ~_.... :-':"!-" ...... 00 00 !" n o ~ ~ >m(J)tDl.1Immm~ 0' 8:.g ;: 5: 5: ~ ~ ~ g. i ~-o :; ~ s= s= s= ~ ::l (')::l ~ ~(Qa:la:I(QtO QII g!.a.:w:"mCOtD;bo~ C/lI;:O Qiit 11l 2'3. ~ i II") c: _ < g.a OJ !!. :::J g E. .g ~ CII 0: 3 en:;- 11l ~ ~ ~ c ~ ! 3 ~ :< ~~~f:b~~t": (01.0"'" oOJ 0"'" CD ......oUJoo.....mO)O) ~ Ca>Cnwow:"':"'t..> .......... en OUt CCI 0"'" ~Q).....O(ol.COCClO ~- -- ..... D:I 0..... to,) N .....(.01 ~:... W :...'W m N W./lIo .,::!o.....ooo......m ~:o 00 '" '" - N tn '" '" -2!0000 '" ~ '" '" 00.... ~- '"' "' .... en ..... t>.) ,f/Io ~:... b :... :... CD co ..... ..... ..=:O(,.lOCDOt-.)O ~- - ... '" '"' 00 .. b ......, '"....I '" - '"' .:joenoOOO..... ~ - Cn_ C7I ..... w,f/lo ./lIoCDU)..... Ut .....00 COco.,r:.. OJ ,f/IoCJ) ~ ;..,'"co A .. ......,:... cnCl1CD go UlCI1 ..=:N.....ONOlQN .~- '" - '"''"' W.....CI1 W (ON ..........0)0 W 01(.01 ~ Cn:"'w w tnw, OWCOO (.01 cot>,) ....,eWdJ 0 (.01 0 W..... 000000000 ~ -~--,",""'" - caW-:"'OCDCnl..:t'"o CD.....cnooooo _ .9' ~,? ,?_~-;-~_:..CD cn....,.oco............... ;~g:glt~~~ ill ~"U i:'~ O' m g> 3 < c3 0' ~ g: ~ '< i~ ~ .. r C' ~ -< ;:: ." '" 0 ~"9 ~~ in g ;:: < 0 f[ o z ~ !!L ~ g' c. !!. .... ~ !!. ~ t :t ~ ~ -\ ~ --i o [ m::O .. " ~3 3 .. " <D li)"'< 0.0 -.,0 ~ " o ::l Cii'~ !:l.-., OJ" cg 0.0 'g::!: ~o ~ ~~ .. .." ~" 1:: ~. 0-= o~ .. ~ o' ::l o ~ .." --i ~ iD .. o o '" e DRAFT Ramsey County Public Works Facility Financing Plan January 6, 2003 1/9/2003 Year Source Amount Public Works Available Funds: 1999 Operating Funds 150,000.00 2001 CIP Bonds 185,000.00 2002 CIP Bonds 5,400,000.00 Current Financing Sources 5,735,000.00 2003 CIP Request 18~ 100,000.00 2004 CIP Request 2,765,000.00 Total Requested Financing Sources 20,865,000.00 2004 Arden Hills 2,976,711.00 2004 Mounds View Public Schools 1,276,654.00 2004 Ramsey County Library 90,000.00 Total Other Revenues to be Appropriated 4,343,365.00 Total Public Works Budget 30,943,365.00 e e . ~ ~HILLS MEMORANDUM DATE: Agenda Item 3.A.2 January 16, 2003 TO: Mayor Beverly Aplikowski Council Member David Grant Council Member Brenda Holden Council Member Gregg Larson Council Member Lois Rem JOe Lynch, City Administrator Aaron Parrish - Community Services Director II Ramsey County Maintenance Faeility: Plarming Review FROM: SUBJECT: Overview The County is in process of preparing their site plan and special use permit application for their proposed maintenance facility. From staff's perspective, it would be preferable to retain DSU to facilitate/conduct the planning review for the following reasons: 1. To the extent that this proposal has implications for adjaeent TCAAP property and the TCAAP pI arming process, DSU would be better equipped to deal with the review than city staff. 2. Given the City's potential location within the facility, DSU would be in a better position to provide an objective analysis than city staff. If the Council is comfortable with this approach, staff will place this on the next Council meeting agenda. Financial.lInulications It is anticipated that DSU would bill the City on an hourly basis for services provided in conjunction with the Ramsey County Public Works Facility plan review. Given the uncertain scope of review at this point, an aceurate estimate is not available at this time. Like most pi arming cases, it is antieipated that the County will submit an escrow amount that the City will charge any direct expenses against. Accordingly, it is anticipated that the use of DSU in this instance will be expenditure neutral. If for some reason the escrow amount is waived or reduced by the Council, funds from the TCAAP Special Revenue eould be utilized. Requested Action . Provided for discussion purposes . . . . URS Agenda Item 38 MEMORANDUM Thresher Square 700 Third Street South Minneapolis, MN 554 I 5 Phone: (612) 370.0700 Fax: (612) 370.1378 To: Mr. Joe Lynch/ City of Arden Hills Copy: Nick Landwer/URS File: 379510056001 Tom Moore/AH From: Greg Brown Arden Hills City Engineer Date: January 15, 2003 Subject: Karth Lake Update Background Several residents around Karth Lake expressed concern over the unusually high water level of the lake during the past summer. As a result of this coneern, the Council directed City staff to pump water out of the lake using temporary pumping apparatus. The lake level was lowered approximately 2 feet. During the pumping a number of residents along Wyncrest Drive expressed eoncerns over lowering the lake level and a couple residents complained of adverse effects from the pumping (City staff was unable to validate those claims). The Council indicated an interest in further monitoring of the level ofKarth Lake and evaluating the feasibility of a permanent means to keep the lake elevation under control. URS and City staff are proposing to install a lake level gage while the ice is strong enough to support workers. The gage will cost approximately $200 and require about 4 hours to install. After the installation, URS surveyors will calibrate the gage and City staff will monitor the lake level to develop more data regarding the effeets of rainfall on the lake level. A feasibility study of potential permanent pumping systems may be initiated at any time the Council desires, however Couneil may want to wait to observe the lake levels after the Spring thaw and subsequent rainfall events. PROJECTS\ARDENHIL\3795I \GENERAL\Documents\Agenda Memo 1-15-03 Item 3B.doc . . . ~ EN HILLS MEMORANDUM DATE: Agenda Item 4.A January 16, 2003 TO: Mayor and City Council Joe Lyneh, City Administrat~ 2003 City Council Retreat FROM: SUBJECT: ENCLOSURES: City of Arden Hills 2003 Session I Retreat Agenda Enclosed is a copy of the agenda proposed for Session I of the 2003 City Council/Staff Retreat seheduled for Saturday, January 25,2003. This is the first of three sessions to: 1. 2. 3. 4. Establish the vision/mission for the City, Establish goals for the City for the year 2003, Build/rebuild trust between and amongst staff and City Council, Update staff and City Couneil. All activities for Session I will occur at Arden Hills City Hall. Lunch will be provided. Welcome and introductions will be presented by Mayor Aplikowski and City Administrator Lyneh, followed by an introduction from the facilitator, Marilyn Condon. Ms. Condon will explain the purpose of the meeting, establish the ground rules, and take the Couneil and management staff through an exereise designed to encourage all parties to think about the past, present, and future. After lunch Ms. Condon will continue by establishing a process to identify the top priority issues for 2003, from a Council/management stand point. The Council has recently indicated that they would like to have some items included on the Staff Retreat agenda which includes: . Neighborhood meetings; . Ingerson Road Project, speeifieally Lake Josephine Association discussion/negotiation . Ramsey County Public Work Facility; etc. The agenda was established before the Council's discussion took place about their desire to have some of these items addressed; therefore the agenda has not been modified. If these are the most important items, they should be established as priority goals for 2003 during the discussion about mission, vision and goals. Also included is a copy of the proposed agenda for Session II of the 2003 Council/Staff Retreat scheduled for February 21, 2003. This is a meeting designed to facilitate communieation between City Council and all City Staff, provide an opportunity for information exchange, and provide a question and answer period between the two groups Recommendation: There is no need for action by the Couneil at this time. Information is provided for your review and comments. . . . ~ ~~HILLS City of Arden Hills 2003 Council Retreat . Session I Friday, February 21, 2003 Arden Hills City Hall 1245 W. Highway 96 Arden Hills, Minnesota 55112 AGENDA A. ArrivalJRefreshments 8:30 a.rn. B. Welcome and Introductions Administrator Lynch 9:00 a.rn. . AND Mayor Aplikowski C. Facilitator Marilyn Condon 9 - NOON 1. Purpose 2. Ground Rules 3. Guided Imagery Exercise - Past, Present, Future D. LUNCH (will be provided) NOON - 1 p.rn. E. Facilitator Marilyn Condon 1 p.rn. - 3:30 p.rn. 1. Mission, Vision, Values 2. Next Steps - Link to GOALS F. Closing Comments 3:30 p.m. . e ~ ~~HILLS City of Arden Hills 2003 Council Retreat Session II Thursday, March 6, 2003 Arden Hills City Hall 1245 W. Highway 96 Arden Hills, Minnesota 55112 AGENDA A. Arrival/Refreshments 8:30 a.m. . B. Welcome and Introductions Administrator Lynch 9:00 a.rn. Mayor Aplikowski C. Facilitator Marilyn Condon 9:00 a.m. - NOON 1. Ice Breaker 2. Ground Rules 3. Teams vs. Work Groups 4. Discussion D. LUNCH (will be provided) NOON - 1 :00 p.rn. E. Responses, Roles 1 :00 p.m. - 2:30 p.rn. F. Next Steps and Closing Comments 2:30 p.rn. - 3:00 p.rn. . / . . . ~ ~~LLS MEMORANDUM DATE: Agenda Item 4.B January 17, 2003 TO: Mayor and City Council FROM: Joe Lynch, City Administrat SUBJECT: Lake Josephine Hills Assoeiation-Ingerson Court/Fernwood Channel Improvements ENCLOSURES: Lake Josephine Hills Assoeiation Letter to Mayor and Council dated January 13, 2002 The City Council has decided to proeeed with the plans for the 2003 Ingerson Road Neighborhood Pavement Management Program. The Ingerson Road Improvement eontemplates improvements to the end of Ingerson Court and the Fernwood Channel, which is property owned by Lake Josephine Hill Association. The enclosed letter identifies Lake Josephine Hills Assoeiation Taskforce Members and requests a legal propcrty survey of the Lake Josephine Hills Association property. The Association would like to reeeive this before proceeding with discussion/negotiations on the improvement proposed to their property. The letter includes one statement that needs to be clarified. In the fourth paragraph, the letter indieates that the City.. ."plans to redirect and dredge the channel and lay pipes and drains across the association property." The City plans to change a portion of the property, but this does not include any portion of Lake Josephine Hills Association property. The City also plans to improve the flow of the channel by removing the silt and debris that has built up in that channel and causes it to be less effieient. The City has no plans to lay pipes or drains across the association property. The City does desire to place a Freneh drain on the northern edge of the property to assist with run-off from the end of Ingerson Court. The proposed improvements to the Fernwood Channel are ancillary to the overall Ingerson Road and Ingerson Court project and are not eritical. The City can just make improvements within the street and the right of way without impacting the Association property. However, if the Council would like to pursue making improvement to the channel, staff feels this is an improvement to the existing condition of the channel and will benefit the property and increase the value. In order to accomplish the proposed plan, the engineer will produee a diagram showing the exact location of the street, right of way and any existing easements. The diagram will not be a legal property description. As for the improvements to the channel, we will need an , Memo to City Council January 17, 2003, Lake Josephine Hills-Ingerson Court/Femwood Channel Improvements Page 2 of2 . easement from Lake Josephine Hills Association from the end of Ingerson Court across their property to the channel and along the channel to make the improvements. This will be a permanent easement beeause the plan proposes that the City continues to have access to the channel to perform routine cleaning and maintenanee. In setting assessments for the property, the City has established a price per foot charge for all benefiting properties. The Lake Josephine Hills Association would receive an assessment based upon the number of front feet surrounding and along Ingerson Court. Assessments can not be based upon the value of land or any improvements on them. The Lake Josephine Hills Association seems to try to make an argument that the assessments are not in proportion to the value of their land. They are correct. Assessments are based upon benefits received and not upon the value of the property. If the Council does feel compelled to survey the property, it should do so with the understanding that this activity is not related to assessment and will not change the value of the assessment. Recommendation Staff is seeking direction from the Council on the following items: · Does the Council want to authorize a legal survey of the Lake Josephine Hills Association property? . . Determine if the City wants to negotiate for the easement across the channel to the Lake Josephine Hills Association property. · Establish who will meet to discuss and negotiate with Lake Josephine Hills Association. . . . . Dorle Vawter 1226 Ingerson Rd. Arden Hills, MN 55112 651 63 l-2076 dorlevawter@attbi.com January 13, 2002 Mayor and Council Members City of Arden Hills Arden Hills, MN 55112 Dear Mayor and Couneil Members: Thank you for working with the Ingerson Road neighborhood to craft a more reasonable road improvement project. Your support is very much appreciated. In response to the Council's request, the Board of the Josephine Hills Association and other interested members met in December to discuss the proposed road improvement plans and to seleet a Josephine Hills Association ad hoc Task Force to work on the Fernwood Channel project. The members of this Task Force include: Lynn Diaz Doug Hartford Linda Swanson, and Dorle Vawter. The members ofthe Association support in eoneept efforts to improve the water quality of Lake Josephine. We believe, however, that before we can finalize any legally binding agreement with the City about plans to redirect and dredge the Channel and to lay pipes and drains across Association property that it is necessary for the City and the Association to replace the "conceptual maps" of the proposed projeet with a detailed map that includes clear and accurate surveys ofthe property lines and easements including the current dimensions and location of the Channel and its bridges. I am writing to you on behalf of the Josephine Hills Association Task Force to ask that such a survey be completed and presented to the Assoeiation together with a eorresponding revised map of the proposed modifieations. These items are required before it is reasonable for the Association (and the City) to proceed with these critical negotiations. While we wish to be eooperative and not interfere with the City's plans to proceed with this pavement improvement project, we do foresee some potentially time consuming negotiations and therefore believe it would be most advantageous to receive these requested items by the end of January. This will allow sufficient time for negotiations to make changes in the master plan that reflect an agreement or a refusal by the Association to use its land before the assessment hearings in March. Thank you for your attention to these important matters. . Sincerely, Dorle Vawter 1226 Ingerson Rd 651-631-2076 Cc: Greg S. Brown . . ~f ~~ H ~ ~>> ~...... ~~ ~t""" ~CFJ. z " m z ~ n m ~ m'TI -'co 0-' c::t Ol::: =0 -0 '<0. 30 -o::t" -,Ol O::t <::t COco 3- co ::t - Q =<1\.) 00 --no )>w ;xl 0"'0 ~$: I "'0 r r (f) . w . ::E (D" .., en CD (') ~ o ::s o o ~ n ~ " -oOlO :::!.<.5" ::r <::t0l ~..,::t CO..,::t ~COCO ~::t- (3- -00 COC ;::1.- ,<0 ...., :::OJ 00 OC 0.- coo. ::t~ :::::: ol _. _co ,,-, :::::: Q);::;:: '< ::t" 0'..0 ::z: OlCol (J)Q)_ 5'=(1) .:2'.... t--+-f-+ C"\ ~i' ~ (fJ0 ol.... <co COOl co- XCO ~ijj. -'ol ::t::t l.Q0. - iD- coO (fJ . ("):::::0 ~;::;::(tl ::t 2: 3 ::t::to COco < -xco CT -'(f) Q) ~(tl ::t -'0. ^:J _" (fJ l.Q 3 co ::t - G 'TI .... co ::t (") ::t" 0. Q1. ::t olOi"::O -0 "CO "Slco3 o~o <-0< olCOCO -:::; 5.. Ul _.co ::to. l.Q -. 03 ZgJ ::o- cr 3 <~(j) (tl CQ ..., 2:0l~ (")o.~ -coc ~.-Q) CTO_ 03c ~0l=1, ol -.(fJ (")~::: (")Olol co -'- (f)::tco (f) ~ ~~ ~ m ~. ~ (fJ <J "" ::t l.Q - Cil co (fJ 0 -, co 3 ol ::t ~ o ol < (f) ol }>"::j :Jd::r:Jc..., o..c......o.e-CD }>.... a-r3 co -::t(fJ0l (fJ o.c -,::t3 ~ .3 3 g. OJ _. - -- Q) <.C 0l.Q N::t" o;:r CD'- l.Q -. $: 5' :::fl ol(") 0_ -oc Oc -0. .0. co _co co <0. " <" ::0 ;::;:: <. (") co ::t" .... ::t" OJ ol -. ~ 0 -- -~ CO(f)Z o.::t"co l.Q-'"" coc", (f)CT_ (f).... _co OCO (fJ ~ol Ol::t CTo. N' co I\.) o ::t co - .j>. o co o 'TI CO co - peOl:! uosJa6U\ ::s ()lQ OCD r:: .., ;:l.~ ::s . . . TO: FROM: RE: DATE: Arden Hills City Council Josephine Hills Association Task Foree Fernwood Channel Improvements January 21, 2003 The City Council has approved a pavement improvement plan that includes an intention to make water quality improvements to Femwood Channel on Josephine Hills Association (JHA) land, on City and state land, and perhaps on 2 or 3 other private lots as well. This is a complicated project and we believe that there are several important reasons the City needs a more detailed map and projeet proposal. Based on maps we have seen and discussions we have had with property owners, there are several inconsistencies regarding property lines. · For instance, URS map 2003 Exhibit 11 to the City engineer's report (shown at Dec. 9, 2002 Council meeting) does not match a survey done for the JHA in 1980. Furthermore, the location of the property lines may affect the design. · For instance, the engineer's proposal proposes to move the channel from one private property onto the Association's private property. (see p. 10.) Before the engineer can accurately design the project and the City can enter into neeessary legal agreements with the affected property owners, the City must know where the property and project lines are. · More specifically, if there are to be new easements on Association property, Association members will need the City to provide a legal description of the easement for the purposes of registering a modification to their deeds. Once the City has an exact map of existing properties and the Femwood Channel, then it is possible to overlay and discuss placement of proposed improvements and the possible location and type(s) of easements. Until all property and project boundaries are clarified it would be difficult for us and risky for the City to finalize any project details or proposals. We will be happy to talk to the City representatives once we know exactly what is proposed for our portion of the land. l! ,~aser Jet 3200 [l/)@ 1 :.' .~. ..... ~..... i n v e n t Fax Call Report JAN.24.2003 4:43PM Job Date Time Type I dent ifi cat ion Duration Pages Result 58 1/24/2003 4:34:45PM Send 9.75342195ii 1:30 2 OK 69 1/24/2003 4:36:21PM Send 9,7537050891 1:07 2 OK 70 1/24/2003 4:37:33PM Send 9.5515333846 1: 22 2 OK 71 1/24/2003 4:39:01PM Send 9.6512282191 1:20 2 OK 72 1/24/2003 4:40:27PM Send 9.5512279371 0:48 2 OK 73 1/24/2003 4:41:20PM Send 9.6514821262 0:59 2 OK 74 1/24/2003 4:42:25PM Send 9.6512659301 1:11 2 OK . .