Loading...
HomeMy WebLinkAboutCC 01-09-1961 (2)�' MINUTES OF REGULAR t+fEETING Council of the Village of Arden Hills • Monday, Januarg 9, 1961 The meeting was called to order at 8;10 p.m. by Mayor Ashbach. RO�,I, CALL: Present - Ashbach, Kennedy, Stromquist Absent - Crepeau Also Attending - blr. Peterson, Mr. Lund from Eannister �ngineering and Donald Carley, Village Engineer �NNISTER ENGIN�ERING CO - Mr, Peterson reported on the problem the swamp east o the ift station on the north side of the R.R. tracks serving Valentine Hills, etc. is presenting. It has no bottom, necessitating the use of p31in and pipe of extra strength. Cost for the additional piling wi11 be �4,000.00 extra and estimated cost of stronger pipe will be �7.70 per foo.t for approximately the 165� neceasary to use. ?�e also gave progress report on other sections of the sewer project. VILLAGE ENGINEER'S REPORT -?vIr. Don Carley reported on the Jurgenson matter. h4r. Jurgenson, eveloper of Josephine Hills #3 has a bond in with the Village assuring completion of roads when the serrers are in. A sum of �1,498.00 for surfacing and a sum of �182.00 for grading and cleanup work has been paid to the village by Mr. Jurgepson. • P�4r. Carley recommended that these sums be accepted by the Village as final settlement for the street. Kennedy moved and Ashbach seconded acceptance of Village �p�ineer's recommendation to accept checks of i�2r. Jurgenson as final settlement and Clerk is to release his bond. Carried. The Village Clerk is to deposit these checks in a specisl fund. Mayor Ashbach reported that Mr. Stan Olmen has accepted council appoint- ment to fill Mr. Dick Jones unexpired term on the Villa�e Council. His resignation as a member of the School Board of District 621 has been tendered. He will be installed at the next regular council meeting of the Village of Arden Hil].s. �r. Kennedy moved,Nlre. Stromquist seconded a motion that Bannister Engineeriqg �o, proeure property listings and proceed with Assessment role on Improyements #2, 3, and 4 in time to hold assessment hearings early in the summer. Carried. CLERK'S REPORT - The Roseville Engineer called last Friday to report ha e ine from Ftoseville is all set for operation. Mrs. Stromquist moved, Kennedy seconded approval of payment of check for �115,000.00 to Roseville. Carried. __,�.� Nre. Stromquist moved, Kennedy seconded approval of payment of c].aim • �2645 for a sum of �1Fi4.00 out of the 1960 budget as this sum represents deductions made for last three �onths of year. Carried. \ � � ��--� MINIITES OF REGULAR iv�RTING, January 9, 1961 - Page 2 � • � � CT�RK'S F�PORT (Cont'd) Kenne y move , Mrs. Stromquist seconded approval of payment of claims 1001 through 1021. Carried. Mrs. Stromquist read a letter attached to a petition from �Sr. Fred Kosslak reQuestipg the approval of the Mayor and the Village Counci7i for re-zoning of property listed Yrom residential to commercial. Kennedy moved, �1rs. Stromquist seconded this matter be referred to Village attorney. Carried. 1VLr. Donald Lund of E?annister Enginearing presented plans showing proposed sewer line across PFs.Bill Bachman�s property with alternate proposal which could be uaed if Mr. Bachman would consent. The original plan would destroy the saleability of this lot as the sewer line cuts ahnost in the center of it and it could not be used to build on. Since Mr. Bachmaq was not at the meeting it was agreed Mayor Ashbach, Mr.Lund and �dr. Peterson would meet with Mr. Bachman op Tuesday morning to resolve this problem. Mayor Ashbach paid his respects on behalf Council and the Arden Hills Village Staff ivir. Ed Litman, 3�ditor of the Rose Tribune. Meetin� was adjourned at 9:30 p.m. of himself, the Village to the unti.mely death of i - � r � � -�. _ . '� �- i. ��c -- '• • �a� (o. �� � rraine . romqu�s , Clerk— \ �