HomeMy WebLinkAbout04-30-07 Item 4N, Recladding at City Hall
~
~HILLS
Request for Council Action
Prepared By: Michelle Wolfe
Dept.: --:AdiTii-nTstraHon"--
Council Mtg. Date:- .. "-.:-~l~P!TC.~~9_~J9Q?____
Final Action Needed By: "..~pr.H"~.9L.~Q.9.?...,..
Agenda Item:
4.N.
~---------"----------Budgeted Amount:
Actual Amount:
Funding Source:
~-~$O
$12,'760
pjRF~und
M_.m.__'__.___
r~lI[mf1!~J~}I~!Im:r;}JI~ig[~ilf~~_fi_1i_~~1flHEiggQrmL.".,.,.."...."...."....,,,,.,,.,,.,,.''''......m..'_.._...'n'_.._'n"___n_nn_______n__n__n_n_____n_______n____._..__.__"n,._._.._"_.,...."'.._...._..."...."...."."'.''''''....,,,,.,,,,..,,.......,,_,,._,_,,.,,,...'_.".mmm.'_.'_m..,_,_.._'__'n_nn_n___'___________n__n___n__n______'.___".,,,,,,.,.,,.
i . Motion to Accept the Proposal Submitted by Wiss, Janney, Elstner and Associates for Providing Construction Administrative Services
I During the RecJadding Project at Arden Hills City Hall in the Amount of $12,700.
Motion to Accept the Proposal by Janney, Elstner and Associates
During the RecJadding Project at Arden Hills City Hall in the Amount of $12,700.
Administrative
x
Dated April 30, 2007 from City Administrator Michelle Wolfe
No.:
No.:
Recommendation:
Recommendation:
Copy of the Proposal Submitted by Wiss, Janey, Elstner Associates Inc.
~
~~HILLS
MEMORANDUM
DATE:
February 26, 2007
Agenda Item 4.N.
TO:
Honorable Mayor and City Council Members
FROM:
Michelle A. Wolfe, City Administrator ~ J p/jO
Dave Scherbel, Building Official ' l -V
SUBJECT:
City Hall Chimney Recladding Project
CC:
Jerry Filla, City Attorney
Background:
The City Hall has experienced numerous problems with leaking in the chimney area since the
building was constructed in 2001. The City has hired the engineering firm Wiss, Janey, Elstner,
and Associates (WJE) to investigate the cause ofthe water intrusion.
At this time, City staff is recommending City Council approval of a proposal submitted by WJE
in the amount of $12,700 for providing construction administration services during the chimney
recladding project at City Hall. The proposal submitted by WJE would cover the following
areas:
1. Prepare the contract between the City and Building Restoration Company;
2. Attending pre-construction meetings;
3. Documents conditions exposed during the demolition phase;
4. Review contractor submittals;
5. Perform three site inspections to review flashing mockups, flashing system installation
and work in-progress;
6. Perform water spray testing of the completed flashing installation;
7. Respond to contractor questions;
8. Administer changes to work;
9. Review payment applications;
10. Perform final inspection of the completed work.
ReQuest
Motion to accept the proposal submitted by Wiss, Janney, Elstner and Associates for providing
construction administrative services during the rec1adding project at Arden Hills City Hall in the Amount
of$12,700.
"
WJE
ENGINEERS
ARCHITECTS
MATERIALS sef ENTISTS
Wiss, Janney, Elstner Associates, Inc.
600 Highway 169 South, Suite 1520
Minneapolis, Minnesota 55426
952,545,0295 lei 1 952.544.6954 fax
www.wje.com
Via: Deliver
24 April 2007
Mr. Dave Scherbel
Building Official
City of Arden Hills
1245 West Highway 96
Arden Hills, MN 55112-5743
Ll COpy
Re: Construction administration services
Chimney recladding project
City Hall Building
Arden Hills, MN
WJE No. 2005.5144.3
Dear Mr. Scherbel:
Wiss, Janney, Elstner Associates, Inc. (WJE) is pleased to provide you with this proposal for providing
construction administration services during the chimney recladding project at the Arden Hills City Hall
building in Arden Hills, Minnesota.
SCOPE OF SERVICES
WJE will: (1) prepare the contract between the City and Building Restoration Corporation, (2) attend a
pre-construction meeting; (3) document conditions exposed during the demolition phase, (4) review
contractor submittals, (5) perform three site inspections to review flashing mockups, flashing system
installation and work-in-progress; (6) perform water spray testing of the completed flashing installation;
(7) respond to contractor questions; (8) administer changes in the work; (9) review payment applications;
and (10) perform a final inspection of the completed work. A field report will be prepared after each visit.
Full-time inspection will be performed during the demolition phase to document the as-built construction
and to further define the cause(s) of the persistent water leakage problems that have been experienced in
the vicinity of the chimney in preparation for the pending arbitration hearing.
Our design was based upon our field measurements, conditions that were exposed during the initial
investigative phase and the original design drawings. Until demolition is completed, however, we will not
know how well the as-built construction matches the original design drawings. It is likely that some
unforeseen conditions will be enconntered that will necessitate additional inspection and office time to
develop appropriate repair details for construction. This additional design time is estimated to be
approximately $1700 and this amount has been included in our estimated budget for this phase of our
work.
Headquarters & Laboratories-Northbrook, Illinois
Atlanta 1 Austin I Boston I Chicago 1 Cleveland 1 Dallas I Oenver 1 Oetroit I Honolulu 1 Houston
Los Angeles I Minneapolis I New Haven I New York I Princeton [ San Francisco I Seattle I Washington, DC
WJE
ENGINEERS
ARCHITEas
MATERIALS SCI ENTlSTS
Mr. Dave Scherbel
City of Arden Hills
24 April 2007
Page 2
FEE AND CONDITIONS
WJE proposes to perform the aforementioned for an estimated fee of $12,700, including expenses. Our
services will be performed on a time and expense basis in accordance with our enclosed Standard Terms
and Conditions, dated 2 August 2004.
AGREEMENT
If you concur with this proposal, please sign in the space provided and return one copy as authorization to
proceed. Thank you for the opportunity to submit this proposa1.
Very truly yours,
WISS, JANNEY, ELSTNER ASSOCIATES, INC.
Digital signature
Brian J. Pashina, P .E.
Senior Consultant
Enclosure:
WJE Standard Terms and Conditions (2 pages)
C: Mr. Jerome Filla (emailed)
Peterson, Fram & Bergman
Mr. Jeff Coleman (emailed)
Coleman, Hull and van Vliet
ACCEPTANCE
Accepted by:
By:
Title:
Signature:
Date:
P:\PROJECTS\2005\5144.Arcten Hills City HaIl\5144.3 Chimney repair design and CA \Construction administration\Proposal\Chimney repair CA
services 4-24-07.doc
WJE
STANDARD TERMS AND CONOITIONS
Page 1 of2
2 August 2004
These Standard Terms and Conditions shall continue in full force and effect during, and after the
completion or termination of, Wiss, Janney, Elstner Associates, Inc. or WJE Engineers &
Architects, P.C. (WJE) employment. These Standard Terms and Conditions shall control any
conflicting term or condition unless WJE agrees otherwise in writing.
PERFORMANCE
WJE and its employees will exercise the degree of skill and
care expected by customarily accepted practices and
procedures. No warranties, expressed or implied, are made
with respect to WJE's performance, unless agreed to in
writing. WJE is not a guarantor of the project to which its
services are directed, and its responsibility is limited to work
performed for the client. WJE is not responsible for acts" or
omissions of the client, nor for third parties not under its
direct control. WJE shall not be liable for any reason for any
special, indirect or consequential damages including loss of
use and loss of profit. WJE will take reasonable precautions
to minimize any damage to the client's property during
conduct of any WJE field work and testing. The client
understands that in the nonnal course of this type of work
some damage may occur, liability for which damage is not
part of this agreement. WJE may rely upon information
supplied by the client engaging WJE, or the contractors or
consultants involved, or infonnation available from generally
accepted reputable sources, without independent
verification. WJE services are being perfonned solely for
client's benefit and no contractor, subcontractor, supplier,
fabricator, manufacturer, tenant, occupant, consultant, or
other third party shall have any claim against WJE as a
result of its services.
WJE shall not have control over or charge of and shall not
be responsible for construction means, methods,
techniques, sequences or procedures, or for safety
precautions and safety programs in connection with the
project, since these are solely the responsibility of others.
WJE shall not be responsible for the contractor's schedules
or failure to carry out the project in accordance with contract
documents. WJE shall not have control over or charge of
acts or omissions of the contractor, subcontractor, or their
agents or employees, or of any other non-WJE persons
perfonning portions of the project.
USE OF REpORTS, DRAWINGS AND ELECTRONIC MEDIA
WJE retains ownership of letters, reports, drawings,
specifications, photographs, test data, notes and other work
product it has created. These. documents or parts thereof
may not be reproduced in advertisements, brochures, or
sales material, nor used by the client for any purpose other
than the purpose for which they were prepared, nor by third
parties, without the written pennission of WJE. Conclusions
by WJE based on test results are limited to the specific
conditions for which the tests were perfonned. In the event
that WJE work product is stored or transmitted by some
fonn of electronic media, the client agrees that WJE shall
not be held liable for the completeness, transmission,
accuracy or longevity of these materials, nor for misuse
thereof.
PROPOSALS
Proposals expire 120 days after submission to a client
unless a different expiration limit is included in the proposal.
WJE may withdraw or modify a proposal at any time prior to
acceptance by the client. All fees and expenses quoted in
proposals or stated in invoices are exclusive (net) of local or
county excise and other business or business license taxes.
The client represents it is aware of all such taxes and shall
reimburse WJE upon presentation by WJE of the cost of
such taxes by an invoice within one year of completion of
services.
CLIENT DUTIES
In order for WJE to perfonn the services requested, the
client shall, at no expense to WJE, (1) provide all necessary
information regarding client's requirements as necessary for
orderly progress of the work, (2) designate in writing a
person to act as client's representative for services to be
rendered under this Agreement, which person shall have
authority to transmit instructions, receive instructions and
information, interpret and define client's policies and
requests for WJE's services, and (3) provide access to and
make all provisions for WJE to enter, without cost, limitation
or burden to WJE, publicly or privately owned property as
required to perform the work, including the use of scaffolds
or similar mechanical contrivances.
SAFETY
Field work of WJE will be perfonned only under conditions
deemed safe by WJE personnel. Charges may be made for
safety or security measures required by hazardous job
conditions. WJE is not responsible for the safety of other
persons or property.
HAZARDOUS MATERIALS
If WJE encounters, or reasonably suspects that it has
encountered,-hazardous materials in the project, WJE shall
cease activity on. the. project and promptly notify the client..
The client shall initiate action, where appropriate, to identify
and investigate the nature and extent of hazardous
materials in the project and to abate and/or remove the
same as may be required by federal, state or local statute,
ordinance, code, rule, or regulation now existing or
hereinafter enacted or amended. Unless otherwise specially
provided in writing, the services to be provided by WJE do
not include identification of hazardous materials, and WJE
has no duty to identify or attempt to identify the same within
the area of the project.
It is further understood and agreed that services WJE will
undertake for the client may be uninsurable obligations
involving the presence or potential presence of hazardous
materials. Therefore, the client agrees, except (1) such
liability.as may arise out of WJE's sole" negligence in the
perfonnance of services under this agreement or (2) to the
extent of insurance coverage available for the claim, to hold
harmless, indemnify and defend WJE and its employees,
subcontractors and agents from and against any and all
claims, lawsuits, damages, liability and costs, including but
not limited to, CCists of defense, arising out of or in any way
connected with the presence, discharge, release, or escape
of hazardous materials. This indemnification applies only to
STANDARD TERMS AND CONDITIONS
existing conditions and "not to conditions caused or created
by WJE. "Hazardous materials" includes, but is not limited
to, any substance, waste, pollutant (including mold and
mildew) or contaminant, in whatever form, now or hereafter
included with such terms under any federal, state or local
statute, ordinance, code, rule or regulation now existing or
hereinafter enacted or amended.
SUSPENSION OF SERVICES
If the client fails to make payment when due for WJE's
services and expenses, WJE may, upon seven days' written
notice to the client, suspend performance of services under
this Agreement. Unless payment in full is received by WJE
within seven days of the date of the notice, the suspension
shall take effect without further notice. In the event of a
suspension of services. WJE shall have no liability to the
client for delay or damage caused the client because of
such suspension of services.
FIXED PRICE CONTRACTS
Where WJE and the client have agreed to a fixed price
contract, the following WJE Standard Terms and Conditions
are specifically excluded: Time Charges, Expenses,
Equipment Usage, Affiliated Consultants, and
Subcontracted Services. Progress payments will be made
monthly as a percent of completion unless otherwise
arranged with the client. Other WJE Standard Terms and
Conditions stated herein remain in effect.
TIME CHARGES
Time charges are accrued on an hourly basis, unless other
arrangements are established. Minimum time charges for
personnel at a job site are 8 hours per day, unless time can
be utilized on another job. Hourly rates are not increased for
overtime. Billing rates may be increased annually.
ExPENSES
Public transportation, subsistence and out-of-pocket
expenses incurred during travel, communications,
reproduction and shipping charges will be billed at cost plus
5% (invoiced as an expense service fee.) Use of company
or personal vehicles is billed at $ 0.50 per mile.
Expended materials for field and laboratory investigations,
rental equipment, and fees advanced on clienfs beha.lf will
be billed at cost plus 10% (invoiced as an expense service
fee.)
Clients may be charged for the cost of providing copies of
receipts or detailed "back-up" information concerning
expenses.
EQUIPMENT USAGE
WJE equipment used in field or laboratory work is billed at
approximately 1% of the replacement cost per day, subject
to adjustment for minimum or extended usage.
AFALIATED CONSULTANTS
WJE retains certain affiliated consultants as independent
contractors. These affiliated consultants are billed at rates
equivalent to WJE employees of similar education and
professional experience.
Page 2 of2
2 August 2004
STORAGE
Material samples not consumed in WJE's work will be
discarded 30 days after completion of the project unless the
client requests other disposition. Charges will be made for
extended storage of materials, records, or equipment. WJE
will exercise reasonable care in safeguarding materials,
records, or equipment, but disclaims any liability for loss or
damage.
SUBCONTRACTED SERVICES
Services are billed at cost plus 10% if the subcontracted firm
has at least $500,000 of Professional/General Liability
Insurance, otherwise cost is marked up 20%.
SUBPOENAS AND COURT ORDERS
The client is responsible, after notification, for payment of
time charges, attorney fees and other expenses resulting
from a required response to subpoenas or court orders
issued at the request of any party concerning any part of
WJE's work. Charges are based on billing rates in effect at
the time of WJE'$ response.
DISPUTE RESOLUTION
Any dispute that should arise between the client and WJE
shall first try to be resolved through mediation. The mediator
shall be mutually agreed upon and chosen from a list
provided by the _ American Arbitration Association or other
source of experienced professional mediators.
INSURANCE
WJE is protected for general, automobile, workers'
compensation and employers' liability coverage by policies
written by national insurance carriers rated by the AM. Best
Company. The primary limits are $1,000,000 with a
$2,000,000 aggregate on general liability. Excess coverage
applies to exposures over $1,000,000. Endorsements are
not allowed. Coverage is subject to annual renewal.
Increased coverage will be sought if requested. Charges for
additional coverage will be billed to the client.
BILLING TERMS
The firm or individual engaging WJE is responsible for
payment of charges unless WJE is notified in writing, prior to
the time that the charges are incurred, that the engagement
is on behalf of another party. Accumulated charges will be
billed in approximately monthly intervals. State and local
sales and us.e tax wilt be included in the billing if applicable.
Payment in full (in US dollars) is due upon receipt of the
invoice. Invoices which are unpaid 30 days from the invoice
date are considered past due and subject to an interest
charge at the rate of 1 1/2% per month (or at a lower
maximum legal rate) plus related attorneys' fees and
collection expenses.
The client is responsible for payment of all charges. Agents
of the client who engage WJE are also responsible for
payment of all charges unless WJE agrees otherwise in
writing prior to the time that the charges are incurred.
Copyright 2004 Wiss, Janney, Elstner Associates, Inc.