HomeMy WebLinkAbout06-06-07-PC
Chair ~ 1245 W. Highway 96
David Sand ~HILLS Arden Hills, MN 55112
Commissioners 651.792.7800
Andrew Holewa Arden Hills www.ci.arden-hills.mn.us
Clayton Larson
Liz Modesette Planning Commission
Janet Stodola
Roberta Thompson June 6, 2007
Clayton Zimmerman
City Vision
A strong community that values our unique environment, our fiscal soundness,
and our tradition as a desirable citv in which to live, work, and olav.
Agenda
Planning Commission Convenes 6:30 PM
Call to Order
1. APPROVAL OF THE AGENDA
2. MINUTES
A. May 2, 2007 Meeting
3. PLANNING CASES
A. Planning Case 07-006; Conditional Use Permit; David Hagen; 3631 Pascal Ave N - Public
Hearing
B. Planning Case 07-013; Planned Unit Development Amendment; Hood Packaging; 1887 Gateway
Boulevard - Public Hearing
C. Planning Case 07-014; Preliminary Plat, Final Plat and Variance for the Subdivision of Hazelnut
Park Subdivision #3- Public Hearing
D. Planning Case 07-010; Conditional Use Permit Amendment and Variance; Celestica; 4300 West
Round Lake Road - Public Hearing
4. UNFINISHED AND NEW BUSINESS
A. RV Outside Storage Regulations - Verbal Update
B. 2008 Comprehensive Plan Update Schedule
5. REPORTS
A. Report from the City Council
B. Planning Commission Comments and Requests
6. ADJOURNMENT
A quorum of the City Council may be present at this meeting.
Planning Cases are available online at:
http://www.ci.arden-hills.mn.us/planningcases
~
EN HILLS
Planning Commission
June 6, 2007
Planning Case Map
o 800 1,600
,
3,200
,Feet
Prepared: May 29,2007
~
~HILLS
MEMORANDUM
DATE:
June 6, 2007
PC Agenda Item 3.A
TO:
Planning Commission
James Lehnhoff, City Planne~
PC #: 07-006
Conditional Use Permit
David & Karin Hagen
3631 North Pascal Avenue
FROM:
SUBJECT:
Update
At the April 4, 2007, meeting, the Planning Commission reviewed a Conditional Use Permit
(CUP) application for David & Karin Hagen at 3631 North Pascal Avenue. The CUP application
was for a request to store an RV outside of a structure in the rear oftheir property. According to
the Zoning Code, RVs less than 28 feet in length can be parked without any special permits, RVs
between 28 and 34 feet in length require a CUP, and RVs longer than 34 feet are not permitted to
be stored outside. Along with the CUP application review, the Commission made an
interpretation ofthe Zoning Code on how the length of an RV should be measured.
At the April meeting, the Planning Commission determined that an RV should be measured from
end to end. When measured from end to end, the RV in this planning case was 37 feet II inches
long and, as noted above, RVs longer than 34 feet cannot be parked outside. Because of that
ruling, the CUP application could not be approved and, subsequently, the Planning Commission
unanimously recommended denial of the CUP application to the City Council.
The City Council received the Planning Commission's recommendation at their April 30, 2007,
meeting. Upon review of the planning case, the City Council unanimously agreed with the
Planning Commission's interpretation of the Zoning Code on how the length of an R V should be
measured.
While the City Council did not overturn the Planning Commission's recommendation of denial
for the CUP application, the Council did vote (3-2) to remand the CUP application back to the
Planning Commission for further review. The planning case was remanded back to the Planning
Commission because Mr. Hagen stated that he wanted to explore the option of trading his current
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inet.uslardenhills\P/anninglPlanning Cases\2007\07-006 Hagen CUP (PENDING)\060607 - PC Report - Hagen CUP. doc
Page 1 of2
RV for one that is less than 34 feet long. The Planning Commission can consider approving a 34
foot long RV; however, the applicants were made aware that remanding the application back to
the Planning Commission does not guarantee approval. The amended application will need to be
judged on its own merits. At the City Council meeting, it was determined that Mr. Hagen would
need to remove the nonconforming RV from his property, which he has done.
The applicants are currently evaluating their options for replacing the 34 foot II inch RV with a
shorter RV; however, due to a miscommunication between Staff and the applicants, updated
information was not submitted in time for the June Planning Commission meeting. The
applicants have stated that they will not purchase or store a different R V that is between 28 and
34 feet long before the CUP is approved. The applicants do plan on continuing the review of
their application at the July II Planning Commission meeting. A new public notice will be sent
to adjacent residents informing them of the continued review of this application.
Although the process for reviewing the current RV regulations has started, any revisions to the
RV regulations will not apply to this planning case.
Recommended Action & Proposed Motion Lanl!ual!e
Motion to table Planning Case 07-006 for a Conditional Use Permit application for 3641 N
Pascal Avenue to the July II, 2007, Planning Commission meeting.
Deadline for Al!encv Actions
The City of Arden Hills received the completed application for this request on March 22,2007.
Pursuant to Minnesota State Statutes, the City was required to act on this request by May 22,
2007 (60 days); however, the City can extend the review period an additional 60 days provided
the applicant is notified. The applicant was notified that the City extended the review deadline to
July 22,2007. The City may, with the consent of the applicant, extend the review period
beyond 120 days.
In order for the Planning Commission to review the CUP in July, the applicant will need to give
the City permission to extend the review period past July 22,2007. This must be done because
the planning cases reviewed at the July II, 2007, Planning Commission meeting will not be
reviewed by the City Council until July 30, which is after the review deadline for this planning
case. The applicant has indicated that he will extend the City's review period.
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inet.uslardenhillslPlanninglPlanning Cases\2007\07.006 Hagen CUP (PENDING)\060607 - PC Report - Hagen CUP.doc
Page 2 of2
~
~HILLS
MEMORANDUM
DATE:
June 6, 2007
PC Agenda Item 3.B
TO: Planning Commission
FROM: James Lehnhoff, City Plann~
SUBJECT: Planning Case #: 07-013
Planned Unit Development Amendment
Hood Packaging Corporation (Matthew Hegstrom)
1887 Gateway Boulevard
ATTACHMENTS: 3B-I Application and Supporting Materials
3B-2 Air Photo and Photographs
ReQuested Action
The applicants have requested a Planned Unit Development Amendment to install two 2,000
gallon storage tanks to the southeast side of the building at 1887 Gateway Boulevard.
Backl!:round
1. Overview of Request:
Hood Packaging Corporation is located at 1887 Gateway Boulevard in the Gateway Business
(GB) Zone on Interstate 35W. Hood Packaging is a national company that manufactures
various types of paper and plastic packaging products. The company is a conforming use in
the GB Zone. The applicant is requesting a Planned Unit Development (PUD) amendment to
install two additional 2,000 gallon storage tanks to the southeast side of their building. Each
tank is fourteen feet long, five feet four inches tall, and five feet four inches in diameter. The
tanks have a double wall construction and sensors to reduce the possibility ofleaks
The applicant has submitted a letter explaining the basis for the request; however, in sum, the
two tanks would be used to store solvents and waste materials used in their manufacturing
process (Attachment 3B-I). The stored materials would be transported offsite each month
City of Arden Hills
Planning Commission Meeting for June 6, 2007
\\Metro-inet.uslardenhills\PlanningIPlanning Cases\2007\07~013 Hood Packaging PUD Amendment (PENDING)\060607 _ PC Report N Hood
Packaging PUD Amendment.doc
Page 1 of6
for recycling and returned the site for reuse. According to the applicant, the new storage and
recycling system would reduce hazardous chemical disposals by as much as 65 percent. The
applicants do have a valid license with Ramsey County for handling hazardous materials.
Hazardous materials can be handled in the GB Zone with proper licenses.
The two new tanks would be installed next to two existing tanks that were permitted in a
previous planning case in 2000. The tanks are next to the building and approximately 200
feet from the edge of Gateway Boulevard. The fencing around the two existing tanks would
be expanded to screen the two new tanks from adjacent properties. The fence is a chain link
fence with tan fabric mesh that is similar in color to the building. The fence was part of the
approval process for the two existing tanks. A screening wall connected to the building near
Gateway Boulevard also helps screen the tanks from Gateway Boulevard, though the wall
does not provide a significant amount of screening for the tanks.
There will not be any reduction in parking with the additional tanks as all parking is on the
other side of the building. Truck traffic may decrease slightly on the site since the tanks will
reduce waste collection from twice a month to once a month. The tanks will be built on an
existing impervious surface; therefore, no change in impervious coverage will occur with this
application.
The new recycling system and tanks are not expected produce any noticeable odor or any
noise since the system is essentially closed on the outside of the building.
Previous Planning Cases
The property has been part of three other planning cases. In 1997, Planning Case 97-006 was
approved, which was the original PUD for this property. Planning Cases 00-017 and 00-031
were approved in 2000. These planning cases included minor changes to the exterior of the
building and the two existing storage tanks that would be adjacent to the two proposed tanks
in this application.
2. Surrounding Area:
North Industrial/water G-B: Gateway Business/water Office space, manufacturing, and
warehousin /Round Lake
South Industrial G-B: Gateway Business Office space, manufacturing, and
warehousin
Currently Vacant
East Industrial G-B: Gateway Business Approved PUD for 500,000 sf
office s ace
West Industrial G-B: Gateway Business Office space, manufacturing, and
warehousin
City of Arden Hills
Planning Commission Meeting for June 6, 2007
\\Metro-inet.us\ardenhills\PlanninglPlanning Cases\2007107-013 Hood Packaging PUD Amendment (PENDING)1060607 - PC Report - Hood
Packaging pun Amendment.doc
Page 2 of6
3. Site Data:
Industrial
Office space, manufacturing, and warehousing
G-B: Gateway Business
8.93 Acres (388,99Isl)
The building and parking area is generally flat. The property slopes down steeply
towards Round Lake, and it slo es down toward Gateway Boulevard.
Plan Evaluation
1. Applicable Regulations:
Regulation: Section 1325.05 Subd 4.Q requires all above ground storage tanks, except
tanks used for liquefied petroleum, to be screened from view. Such screening shall
conform to the Uniform Fire Code and the setback requirements for screen fencing in this
Section.
Proposal: As noted above, the tan colored mesh fabric chain link fence will be extended
from the two existing tanks to screen the two proposed new tanks. The tanks will not be
higher than the fence.
Regulations: Section 1325.07 Subd 5. Emission or creation of noise, odors, vibrations,
glare, dust, smoke, heat and toxic or noxious fumes shall conform to such standards as
are from time to time established by the Minnesota Pollution Control Agency. None of
these shall be at a level that is objectionable to surrounding properties.
Proposal: The recycling and tank system is not expected to produce any noticeable odor
or noise outside of the building. Waste is currently collected twice a month and there
have not been any odor complaints related to that system. Waste collection will be
reduced to once a month, and the waste will be pumped directly into trucks for offsite
recycling. If any objectionable odor is produced, the applicants would be expected to
reduce or eliminate the odor so as not to be a nuisance to adj acent properties.
2. Conditional Use Permit Amendment - Section 1355.04 Subd 3
Section 1355.04 Subd 3 of the Arden Hills Zoning Code lists the criteria for evaluating a
Conditional Use Permit. The Planning Commission and City Council shall consider the
effect of the proposed use upon the health, safety, convenience and general welfare of the
owners and occupants of the surrounding land, in particular, and the community as a whole,
in general, including but not limited to the following factors:
I. Existing and anticipated traffic and parking conditions;
2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid
waste, and other nuisance characteristics;
3. Drainage;
4. Population density;
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
IlMetro-inet.us\ardenhillsIPlanning\Planning Cases\2007107-0J 3 Hood Packaging pun Amendment (PENDING)\060607 - PC Report _ Hood
Packaging PUD Amendment.doc
Page 3 of6
5. Visual and land use compatibility with uses and structures on surrounding land;
adjoining land values;
6. Park dedications where applicable; and the
7. Orderly development ofthe neighborhood and the City within the general purpose
and intent of this ordinance and the Comprehensive Development Plan for the
City.
3. Additional Review
The Building Official and Fire Marshal have reviewed the application and neither had any
concerns with the proposal or had recommended changes. Adherence to the building and fire
codes is expected.
Findinl!s of Fact
The Planning Commission must make a finding as to whether or not the proposed parking
expansion meets the requirements of the Zoning Code and if it would adversely affect the
surrounding neighborhood or the community as a whole. Staff offers the following findings for
consideration:
General Findings:
I. Hood Packaging Corporation is a conforming use in the Gateway Business Zone.
2. The applicant proposes to add two 2,000 gallon tanks to the southeast side of the
building. Each tank is fourteen feet long, five feet four inches tall, and five feet four
inches in diameter. The tanks are proposed to be double walled and monitored with
sensors for leaks.
3. The tanks will be placed on an existing impervious surface and will not encroach on any
setbacks.
4. The new recycling and collection system is anticipated to reduce hazardous material
disposal by as much as 65 percent.
On the Conditional Use Permit Evaluation Criteria:
5. Truck traffic may be reduced slightly because waste material collection will be reduced
from twice a month to once a month. Parking will not be impacted since all parking is
located on the other side of the building.
6. The two proposed tanks are not expected to alter existing noise, glare, odors, vibration,
$moke, dust, air pollution, heat, liquid or solid waste, or other nuisance characteristics.
7. The two proposed tanks will not impact drainage on the site.
8. The two proposed tanks will not impact population density on the site.
9. The two new tanks will be screened by an expanded fence from two existing adjacent
tanks. The fence matches the color of the building and is unlikely to significantly impact
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inet.uslardenhillsIPlanninglPlanning Cases\2007\07-013 Hood Packaging PUD Amendment (PENDING)\060607 . PC Report _ Hood
Packaging PUD Amendment.doc
Page 4 of6
the subject property or surrounding properties. The visual impact form Gateway
Boulevard is minimal.
10. Park dedication requirements do not apply.
11. The proposal does not conflict with the 1998 Comprehensive Plan.
Notice
Notice was published in the Arden Hills/Shoreview Bulletin and notice was prepared by the City
and mailed to residents within three-hundred fifty (350) feet ofthe subject property.
Resident Comments
Staff has not received any letters, e-mails, or telephone calls from property owners or occupants
in regard to this planning case.
Staff Recommendation
Staff recommends approval of Planning Case #07 -013 for a Planned Unit Development
Amendment at 1887 Gateway Boulevard subject to the following four conditions:
1. The project shall be completed in accordance with the plans submitted as amended by
the conditions of approval. Any significant changes to these plans, as determined by
the City Planner, shall require review and approval by the Planning Commission and
City Council.
2. The two proposed tanks shall meet all applicable Building Code and Fire Code
regulations. The applicant shall obtain all required permits prior to installation.
3. The two proposed tanks and connected recycling system shall comply with the odor,
noise, and other applicable Minnesota Pollution Control Agency regulations. Failure
to comply with these regulations may result in a revocation of the conditional use
permit.
4. The proposed fence shall be installed within two weeks of installing the tanks.
Options & Proposed Motion Lane:uae:e
I. Recommend Approval with Conditions: Motion to recommend approval of Planning Case
07-013 for a Planned Unit Development Amendment at 1887 Gateway Boulevard based on
the findings of fact and the submitted plans as amended by the four conditions in the June 6,
2007, Planning Case report.
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
IlMetro-inet.us\ardenhillslP/anninglPlanning Cases\2007\07-013 Hood Packaging PUD Amendment (PENDING)\060607 _ PC Report _ Hood
Packaging PUD Amendment.doc
Page 5 of6
2. Recommend Approval as Submitted: Motion to recommend avvroval of Planning Case 07-
013 for a Planned Unit Development Amendment at 1887 Gateway Boulevard based on the
findings of fact and the submitted plans in the June 6, 2007, Planning Case report.
3. Recommend Denial: Motion to recommend denial of Planning Case 07-013 for a Planned
Unit Development Amendment at 1887 Gateway Boulevard based on the following findings:
findings to deny should specifically reference the reasons for denial and why those reasons
cannot be mitigated.
4. Table: Motion to table Planning Case 07-013 for a Planned Unit Development Amendment
at 1887 Gateway Boulevard: a specific reason and information request should be included
with a motion to table.
Deadline for Al!encv Actions
The City of Arden Hills received the completed application for this request on May 14, 2007.
Pursuant to Miunesota State Statutes, the City must act on this request by July 14, 2007 (60
days), unless the city provides the petitioner with written reasons for and additional 60 day
review period. The City may, with the consent of the applicant, extend the review period beyond
the initial 120 days.
Attachments
3B-I Application and supporting materials
3B-2 Air photo and photographs
City of Arden Hills
Planning Commission Meeting for June 6, 2007
IlMetro-inet.uslardenhi//slPlanning\Planning Cases\2007\Ol-013 Hood Packaging pun Amendment (PENDING)\060607 - PC Report - Hood
Packaging PUD Amendment.doc
Page 6 of 6
Attachment 3 B-1
Application and
Supporting Documents
~
~HILLS
June 6, 2007, Planning Commission Meeting
~
~HILLS
1245 West Highway 96
Arden Hills, Minnesota 55112
Telephone (651) 634-5120
Fax (651) 634-5137
www.ci.arden-hills.mn.us
Planning Case No.
Submittal Date
Application Completed Date
Accepted by
Receipt Number
Council Decision
Council DecislQn Date
~
2007 LAND USE APPLICATION
A
IIcant:
Address:
Tele none No.:
Fax No.:
Emall Address:
SS7/2
,~~
J
Tvoe of ReQuest'
(J Apportionment of Assessments ($30)
o Comprehensive Plan Amendment ($400)
IB Condl~onal Use Permit or Amended CUP ($300)
o Final Plat ($200 ... $2$ per lot)
Cl Final Planned Unit Development ($200)
o Master Planned Unit Development ($600 ... escrow)
Cl Minor SUbdivision (lot spliUconsolldatlon) ($300)
Cl Preliminary Plat ($400 ... $25 per lot... escrow)
o Re:zOnlng ($400)
o Site Plan Review ($400)
Q Site Plan Review (Sign or Fence) ($250)
(J Vacation of Easement or Right-of-Way ($250 ... escrow)
(J Variance (Zoning COde) ($300)
CI Zoning Code Amendment ($300 ... escrow)
Revised: 12-12-2006
Page I of3
G0tl
-~
. Applicants are responsible for
reImbursement of consultant fees associated
wIth filing. reviewing, and processing of this
appllca~on. Such fees are to be paid in
escrow up front or upon receipt of statement
from the City of Arden Hills. ;::ees include
costs for consultants retained by the City ana
Include consultenl planning services, attomey.
and engineer. 'payment of park dedication
fees are required with the approval of most
subdivision applica~ons.
"The land use application fees do not cover
building. sign, or other permit fees lhat may
be required upon approval of a land use
application.
'Certain applications are subject to review
and approval by the Rice Creek Watershed
District. Contact RCWD diredly at 763-398-
3070 for additional information.
v69"ON
~9909~9,S96 ~ lW9W Al~dO~d dn
L,00c/L,0/S0
CG:~'
Brief Description of Request (please also include a typed. detailed letter explaininQ the project);
~ -bI pl'~~
FilinQ & Information Requirements
The City requests thai you make a pre-application meeting with the City Planner to discuss the
application process, requirements, and deadlines. Unless waived by the City Planner or Planning
Commission, a certified survey of the property is required for all applications. The Planning Commission
and/or City Council may still require a certified survey. A checklist for other required information is also
available.
Complete/Incomplete Applications
An incomplete application will delay the processing of land use requests. The application approvai time
commences and an application is considered officially filed when the City Planner has received and
examined the application and determined that the application is complete. A decision on whether the
application is complete or incomplete shall be made within fifteen (15) working days following the
submittal of the application. When the application is deemed to be "complete" it shall be placed on the
agenda of the first possible Planning Commission meeting provided that all required public notices have
been sent and published.
Payment of Fees
The undersigned acknowledges that she/he understands that before a land use application can be
deemed complete, all required information and fees (including all deposits) must be paid to the City. If
additional fees are required to cover costs incurred by the City, the City Planner has the right to require
additional payment from one or more of the undersigned, who shall be jointly liable for such fees. Such
expenses may include (but are not limited to) direct city payroll and overhead costs, fees paid to
consultants and other professionals, and the cost of printing, mailing, and supplies. The City may
withhold final action on a land use application, withhold building permits, and/or rescind prior action until
all miscellaneous fees have been paid. Applicants are advised that an escrow deposit is required at the
time of the submittal of the land use application to offset costs associated with the proposed project.
Unused portions of an escrow are returned to the applicant upon successful implementation of an
approved plan.
Notice of MeetinQ Attendance
In order for the Planning Commission and the City Council to consider any application, the applicant or a
designated representative must be present at the scheduled meeting. If not, the matter may be tabled
until the next available agenda.
Revised: 01-30-07
Page 2 00
A"enda Deadline and Meet;"" Schedule
The deadline for submittal of land use applicatJons is required according to the schedule outlined below.
There are no exceptions. Planning Commission meetings are typically held on the first Wednesday of
each month at 7:00. PM. though please contact City Hell to verify the meeting date end time. City Council
m..'II'III' Ire h<!lld typically the last Monday of tile Slime month at 7:0.0 PM. Meetings are held in the
COuncil Chambers flt the Clly Of Arden Hills, 1245 West Highway 96. Arden Hills. Minnesota 55112.
unless otherwise stated. Appllcanls are advised thet additional meetings and/or workShops are
SCheduled when necessary upon approval of the Plennlng Commission.
2007 SCHEDULE (.subject to change)
TENTA'TlVE TENTAl1VE
PLANNING CITY COUNCIL
COMMISSION MEETING
APPLICATION MEETING' DATP
DEADLINE (Generally held on the (Generally held on the
DATE' first WedneSdID' at 7:00. p.m.l last Mond~ at 7:00p.m.)
Cecember 4 1200!!! January 10 (2 Wednesday) Januery 29
January 8 February 7 Febru~ 26
February 5 March 7 March 26
MarCh 5 ~r1l4 A/lrJ130
April 2 May 2 May 29
May 7 June 6 June 25
June 4 Juljt 11(2"" Wednes~ayJ July 30
Juk2 AUQust1 AU9ust27
August 6 S~ptember 5 September 24
September 4 October 3 October 29
October 8 November 7 November 26
November 5 December 5 December 10
December 3 JanualV 2 (2008) Janu~28 (2008)
Acknowled"ement and Signature
r aCknOWledge that r have read all Of the Information listed in the City of Arden Hills land Use Application
and fully understand that I am responsible for all costs incurred by the City related [0 the processing of
this apPlica~ . LL(.
{fjM _ I
Property Owner Sign ure (Requir d)
5- 7-/)7
Date
.0?/~07
Dale
Applicant Signature (If different than e property owner)
Please contact the Clly Planner al (651) 634-5134 or by emali atlames.lehnhoff@CLarden-hills.mn.usif
you have any questions regardIng this application.
Additional copiss 0' this spplic.lion form am availabte on the CIty's websita:
Revised: 12-12-2006
htW:11www.ci.aroen.hifls.mn us
Page 3 ofJ
P0f1
P69'ON
[9909[91S96 ~ lW9W ^1~3dO~d dn
ZZ:[l
1,00Z/!,0/S0
'I
~
Hc)c)C>
PACKAGI.........G
C C> R P c:> R. A TIC> ..............
Hood Packaging Corporation is requesting a Conditional Use Permit to expand our
solvent and waste storage tank capacity at our Arden Hills location.
Description ofthe proiect:
Our project would involve adding two additional storage tanks on the backside (eastside)
of our building, in conjunction with our two existing storage tanks.
Currently we have two solvent storage tanks (as pictured) on the east side of our building.
These tanks hold virgin solvents used in our printing process. These solvents are blended
with our ink for manufacturing in packaging materials and in the wash up process for
cleaning between jobs. The virgin material used for cleaning the inks and machines, then
becomes waste. This waste is stored in fifty gallon drums inside our building until
shipped by a licensed waste generator.
If were allowed to add the two additional tanks, our waste would be stored in one tank,
outside the building rather tha.'1 in drums stored in the building. The second tank would
hold reclaimed solvents. With the new tanks, our waste material would be hauled by
tanker truck to be recycled and returned to the plant as reclaimed solvent. This reclaim
material would be used for cleaning of inks and machines and the process would continue
to repeat. Under this new system we would substantially reduce the amount of virgin raw
material and waste materials.
This project would have a significant environmental impact in several areas:
· Reduction in total amount of virgin solvent purchased and used.
. Greatly reduce the amount of hazardous materials in the building.
. Reduce the amount of hazardous chemical disposals by 65% through recycling
into reclaim material.
The new tanks would be double wall construction to eliminate any potential for leakage
or contamination. If a leak were to occur on the inner tank, a sensor in the outer tank to
send an alarm when liquid is detected.
The pumping process and storage process has little or no odor as the process is direct
piping and contained in the same manner as our existing system.
We would expand our fencing to match the existing surround on our current tanks.
There would be reduced truck traffic as the tanks would allow us to ship once a month V s
our current process of twice a month.
There would be no impact to parking, as no public or employee parking is allowed on the
east side of the building.
This project allows us to implement a recycling program to reuse our waste material over
and over again. Holds the bulk of our solvent outside the building and lowers our costs.
Thank you for your consideration of this project.
Matt Hegstrom
General Manager
Hood Packaging Corporation
1887 Gateway Boulevard, St Paul,MN 55112
Fax # 651-636-0663
Office # 651-636-2500, ext-229
Cell # 651-492-9867
, , , ,
, , , ,
, '- , ,
~--- --- ---- ---- --- -, I
~--- ---- ---- ---
r-- --- I I
I I
I I
I I
I I h fY h
I I Jy
I I
I I ~
I I ,..., 10 Of U X ~ }
I I I'f >-< -
I ~ ....... I [ Oc. lC X )( }
I I >-<
Nm EVE ~ L
I NmSl I >-< D r)( }
I PlATE N<ING S1lJlAIi AREA I >- [ 0
I I II ~ 0 If )( }
I I '-
I I t I"--'V '-
I ~
~-- --- --- f---- 1---- --- 1---- ---- : ~ ~
I I ~ 000000 INK -Iii ill
I I 000000
I I
I ~- -- ~. l- f-- ..J 00
L -- LJ
r7 T
.
LJ EXPNm EXISTJNi JID( · ~IR ~;;.l,M ~ I
I- I AO.' UP ~ I 1-
1-- r= ---l ~ ;: -
I 1--' RAPID-UNIT A'_H" += .J
~ I += .J - Existing /. "
I . . V~f?l... ,
I I JankSm
i i V '..! /:~/ /
I~ ~ ! ~ '/ [1/
I I 91 I ~ I - I I 1 V/ ~ f~~
J 0 ~~ JiJ l1J
I V . A '/HY ~
~
L ___ ~
--
---
lR'_n"
'0'_1"
..
"
"
...
,
,
. ,
" ,
"
...
..
I ..J
L________________
,
.L________________..JI
Message
Page 1 of 1
James Lehnhoff
From: Matt Hegstrom [MHegstrom@hoodpackaging.com]
Sent: Monday, May 14, 2007 11 :24 AM
To: James Lehnhoff
Subject: RE: CUP Application question - proposed new tanks
Hi James,
Sorry for not outlining the size. You are correct, the tank size is 2,000 gallon and the tank size is
14 Feet long.
64 In high.
Dia. is 5 feet, 4 inches.
Attached are the pictures.
Please call or e-mail if you need additional information.
Thanks, Matt
From: James Lehnhoff [mailto:james.lehnhoff@ci.arden-hills.mn.usj
Sent: Monday, May 14, 20079:29 AM
To: Matt Hegstrom
Subject: CUP Application question - proposed new tanks
Matt,
How big are each of the tanks? I see that they are each 2000 gallons, but how tell and how big around are the
tanks?
Also, do you have any of the photos that you submitted in electronic format? If so, could you please forward
them to me? If you do not, I will just need to stop by the property sometime in the next two weeks to take some
pictures.
Thanks,
James
James Lehnhoff
City Planner & Recycling Coordinator
City of Arden Hills
1245 West Highway 96
Arden Hills, MN 55112
Direct: (651) 792-7819 - NEW PHONE NUMBER!
Fax: (651) 634-5137
james.lehn hoff@ci.arden-hills.mn.us
http://www.cLarden-hills.mn.us
5/17/2007
Message
Page 1 of2
James Lehnhoff
From: Matt Hegstrom [MHegstrom@hoodpackaging.comj
Sent: Thursday, May 17, 2007 3:42 PM
To: James Lehnhoff
Subject: RE: CUP Application question - proposed new tanks
Hi James,
Yes we are licensed with Ramsey County as a Large Quantity Generator.
Our waste ID # is MNR000102509
Thanks, Matt
From: James Lehnhoff [mailto:james.lehnhoff@cLarden-hills.mn.usj
Sent: Thursday, May 17, 20073:18 PM
To: Matt Hegstrom
Subject: RE: CUP Application question - proposed new tanks
Is the waste materiai generated at Hood classified as "Hazardous Waste?" If so, do you have any required
permits to generate hazardous waste? I do not need an answer this week, just by eariy next week.
Thanks,
James
James Lehnhoff
City Planner & Recycling Coordinator
City of Arden Hills
1245 West Highway 96
Arden Hills, MN 55112
Direct: (651) 792-7819 - NEW PHONE NUMBER!
Fax: (651) 634-5137
james.lehnhoff@cLarden-hills.mn.us
httr./lwww r.i :::!rrlAn_hill!=: mn fl~
-m-Original Message--m
From: Matt Hegstrom [maiito:MHegstrom@hoodpackaging.comj
Sent: Monday, May 14, 2007 11:24 AM
To: James Lehnhoff
Subject: RE: CUP Appiication question - proposed new tanks
Hi James,
Sorry for not outlining the size. You are correct, the tank size is 2,000 gallon and the tank size is
14 Feet long.
64 in high.
Dia. is 5 feet, 4 inches.
Attached are the pictures.
Please call or e-mail if you need additional information.
5/18/2007
Attachment 3 B-2
Air Photo and Photographs of the Site
~
~HlLLS
June 6, 2007, Planning Commission Meeting
~
.~.
w
m < ~
,,]j]:f
Hi>flf.
-;j <ip
~ Ii 8"~ Ii
Jj
o
;;;
~l~~
.J!'.l;;l;~
1':: d:B ~.:z
.~.jlgl]
.,.. l,I) ......('1:...... III
o
.
E
'@
."
o
.
"
o
'0
o
"
,g
o ~
'~bg
..N
"0_
<2"";::
.S ~<
4~ii
8 o..~
00_
f g.i:l
t: e 5
::::~"O
.~ ~.~
==<2"0
E''E ~
8gJ3
<<lOB
..0 0
.- 0 E
g.~ S
S'- 0
"'0
.~ d .....
ES":.<S
a;i~8
.00
O",N
..-
'" <<l"t::
]~<
::l <L) . ~
0"' "
..c~~
B~~
]~::s
." ",0
tH~ e
.5 ~
0150
do8
""
.- "
.,,0'"
0",0
<do~
>>." 0
~:~
"0
.0
S~ g
~<au
. " "
s{l<8
"O~r--
~]g
S(';IN
UIl,lc>
ergM
b"':C
~,6<
.. g ..
.00
~ <..l~ 8
"'c"
'~';j 8
.~ ~ ~
p:!ij ~
.'-'
Eoo
"-!':
~] ~
,x:13S
~.Eo
~~c-:
<.,,0
-' M
U
'"
Q
"0
l-o
~
~
~
-
=
o
~
>>
~
~
.....
~
o
r-
oo
00
l""'l
o
~
'"
Vi
'"
u
!3
o
'"
.g
'"
;:l
CY
>-
0)
~
r/l
B
~
i:
1>
~
~~~ n~
~"Jij]! ~~iq
HhUHliii
\'\'-\.10
~
..
~
..
<:l.l
-
=
o
~
;;.,
~
~
<:l.l
.....
~
C-'
r-
OO
00
.-i
~
:E
"'
~
...:
"
-g
~
I
"
.
5
"
'C
g
-
o
"0
] ::
~ <8
o ~
'p >'8
~]~
<8 ",,'!::
.$ ~<
.@~li
:SQ..-@i
gB(;
~f.g
~~-8
.~ ~.~
:=.s~
8'] ~
8~3
'" tV 8
..0 "
.- 0 E
g..: 8
8;0 8
.~ Iii ...
F: A~
~~b
000
0.0,"
~~:c
"3~<
;g <u . ~
tl)il ~
.0",,,
s.$~
]] ~
" "'u
~H~ ~
.s ~
o~tl)
d08
. .
:Oi:J-g
aiJ~
~] 8
~ : ~
~~ S
8.:; 0
o.~u
e~~
"'O<l!:lr-
",,0
]a~
aL~o
_"M
b"':C
i~<
-"s"
.0.
_ u 8
J:!.e:;O
'13'[l13
o . 0
.~ 5 e
o.'~ ~
<<:1;...:3
Eo"
:a:Ot::
r-< ~ ~
~~b
!'JoSo
;;;,,'"
:;:~o
..., ::::
u 'C
en
i5
E
Pi
Ui
'"
u
f3
o
en
~
~HILLS
MEMORANDUM
DATE:
June 6, 2007
PC Agenda Item 3. C
TO:
Planning Commission J.r
James Lehnhoff, City Planne1/
Planning Case #: 07-014
Preliminary Plat, Final Plat, and Variance for Hazelnut Park #3
Barry O'Meara
PID: 333023320059
FROM:
SUBJECT:
ATTACHMENTS: 3C-I
3C-2
3C-3
3C-4
Application and Supporting Materials
City Engineer Review
Air Photo and Photographs
Plat Maps and Supplementary Plans
ReQuested Action
The applicant is requesting approval of a preliminary plat and final plat to create sixteen
conforming properties in the Hazelnut Park #3 subdivision. The applicant is also requesting a
blanket variance to reduce the front yard setback requirement from 40 feet to 30 feet on all
sixteen ofthe properties.
Backl!round
1. Overview of Request
The applicant has submitted two separate but related applications. The first application is for
a preliminary and final plat to create sixteen conforming lots and one outlot in the Hazelnut
Park #3 subdivision. The property does not have an assigned address; however, it is located
in the southwestern comer of Arden Hills adj acent to Cleveland A venue, south of Katie
Lane, and west of Hazelnut Park.
If the plat is approved, the sixteen new lots would each be used for detached single-family
homes. Katie Lane would extend south and west through the subdivision and connect to
Cleveland Avenue. The applicant is choosing to retain ownership of Outlot A; however, it
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inet.uslardenhills\PlanningIPlanning Cases\2007\07-014 Hazelnut Subdivision 3 Preliminary Plat - Final Plat - Variance
(PENDING) \051807 - PC Report - Hazelnut Park 3 - Plat and Variance.doc
Page 1 of 15
would not be developable because virtually the entire lot would be inside of a drainage
easement. Although no structures could be built on Outlot A, it could be used for gardens or
other types oflow impact uses provided the uses do not interfere with drainage or any
utilities. The City would not be responsible for repairing the damage to any uses on Outlot A
that may occur during maintenance and/or repair work on Outlot A.
The second part of the application is a request for a blanket variance to permit all sixteen lots
to have a 30 foot front yard setback instead of the typical 40 foot setback as required in the
R-3 Zone. A blanket front yard setback variance was approved for the entire Hazelnut Park
subdivision in 1983 when this subdivision was first approved in Planning Case 83-00 I. Both
the first and second phases ofthe subdivision permitted new homes to be constructed at a 30
foot front yard setback. The City Attorney has determined that the original blanket variance
approval from 1983 has expired; therefore, the applicants are requesting a new variance to
continue the 30 foot front yard setback in the third phase. The applicants have submitted a
letter explaining the basis for the variance request (Attachment 3C-l).
The preliminary/final plat approval is not necessarily contingent upon approval of the
variance. However, the variance is contingent upon approval ofthe preliminary/final plat.
Joint Preliminary and Final Plat Review
While the City has tended to hold preliminary plat and final plat meetings separately in the
past, that is not a requirement of the subdivision process or State Statutes. The preliminary
plat meeting is generally used to review the full design and layout of a plat with a public
hearing. The final plat meeting does not include a public hearing and is more of a technical
check. Generally speaking, by the final plat stage, no new conditions related to the design or
l;tyout ofthe plat can be imposed. If the preliminary and final plat meetings are held
together, a public hearing is required.
The preliminary plat and final plat meetings are often held separately for one or both of the
following reasons:
I. The layout of the preliminary plat does not conform to the underlying zoning
requirements and a redesign is needed or a significant variance review is needed. In
this instance, the final plat meeting is needed to confirm compliance with the zoning
code, variances, and any other applicable conditions from the preliminary plat review.
2. In some cases, it is in a city's best interest for a non-layout condition to be completed
before the final plat is approved. For example, one or more lots may require
significant grading work to make the lots buildable. Since most cities, including
Arden Hills, avoid creating new non-buildable lots, a city may require completion of
the work prior to officially creating the new lots in the final plat. Withholding
approval of a fmal plat can be a strong motivational factor for an applicant to
complete certain conditions in a timely manner. Alternatively, the need to complete
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
IlMetro-inet.uslardenhi/lslPlanninglPlanning Cases\2007\07-014 Hazelnut Subdivision 3 Preliminary Plat - Final Plat - Variance
(PENDING)\051807 - PC Report - Hazelnut Park 3 - Plat and Variance.doc
Page 2 of 15
conditions prior to approving a final plat can be offset if the developer submits an
escrow or other financial surety to guarantee completion of needed work.
For the Hazelnut Park #3 subdivision, a separate final plat meeting would probably not add
anything productive to the review process. The lots in the proposed subdivision conform to
the requirements of the Zoning and Subdivision Codes. Additionally, the applicant will be
submitting a developer's agreement with a financial surety to the City for the road, utility,
and drainage work that will need to be completed on the property. All drainage and utility
easements will be filed when the plat is filed with Ramsey County. The developer agreement
will be subject to City Attorney review and City Council approval.
If, however, there are concerns or other questions that cannot be addressed at the meeting, the
Planning Commission can still table a combined preliminary/final plat review.
Previous Approvals
A preliminary plat and blanket front yard setback variance for the entire Hazelnut Park
subdivision, including the phase in this application, was approved by the City in 1983 in
Planning Case 83-001. The final plat for the first phase was also approved in 1983. The
second phase was approved in 1992 under Planning Case 92-002. In 1992, the front yard
setback variance was considered to still be in effect and, therefore, a new variance
application was not reviewed.
The proposed third phase in this application is substantially in conformance with the
approved 1983 preliminary plat; however, the City Attorney has determined that due to
changes in the Subdivision Code since 1983, a new public hearing and preliminary plat
review is required. Had the preliminary plat still been in effect, only a final plat would have
been needed.
2. Site Data
Low Density Residential
Single Family Residential
R-3: Townhouse and Low Density Multiple Dwelling District
8.75 acres (381,150 square feet)
The topography is varied, but the property generaIIy drains to the southwest toward
the ond.
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
IlMetro-inet.uslardenhil/s\PlanninglPlanning Cases\2007\07~014 Hazelnut Subdivision 3 Preliminary Plat - Final Plat - Variance
(PENDING)\051807 M PC Report -Hazelnut Park 3 w Plat and Variance.doc
Page 3 of 15
3. Surrounding Area
North Low Density Residential Single Family Detached
Residential
South Low Density Residential Single Family Detached
Residential
East Low Density Residential Hazelnut Park
West Low Density Residential R-2: Single Family Detached
Residential
Plan Evaluation
1. Zoning Code - Minimum Lot Requirements - Section 1320.06
1. Minimum Lot Area s
SF er Dwellin Unit
Sin Ie Family
3. Minimum Lot Size (ft,
width/de tbloorner lot width
Sin Ie Family
11,000
85/120/95
4. Rei ht ft
5. Floor Area Ratio .A.R.
35
0.3
6. Lot Covered b Structure
7. Min. Landsca e Lot Area
8. Minimum Buildin Setbacks ft
Front rd
25%
65%
40
30
10
Side Yard Interior - Accesso
Side Yard Comer
5/15
10
40
City of Arden Hills
Planning Commission Meeting for June 6, 2007
IlMetro-inet.uslardenhillslPlanninglPlanning Cases\2007\07-014 Hazelnut Subdivision 3 Preliminary Plat - Final Plat - Variance
(PENDING)\051807 - PC Report - Hazelnut Park 3 - Plat and Variance. doc
Page 4 of 15
A. Proposed Lot Size, Width, and Depth
Hazelnut Park #3 Proposal
Total Lot Area Outside Depth
Block Lot Area (sf) Easements Width at 30' Setback (ft) (ft)
(sf)
1 12,612 8.294 85 142
2 11.416 8,075 S5 130
3 12.488 S,817 See Below 139
w
z 4 11.474 S,238 85 130
0
5 11,857 8.368 85 120
6 12.408 8,761 85 120
7 12.408 8.198 95 130
1 11,050 7.102 85 130
2 11,050 7,738 85 130
3 11,050 7.738 85 130
4 12,727 8,605 86 130
~ 5 26,375 8.617 85 146
6 25.262 8,288 85 157
7 14,042 7,279 85 130
8 11,006 5,975 85 130
9 18,592 7,682 222 130
Minimum 11,000 NIA 85 (95 of corner lots) 120
While Lot 3 Block I includes additional discussion below, all sixteen of the lots
meet or exceed the minimum lot size, lot width, and lot depth requirements in the
R-3 Zone.
Lot 3 Block 1
According to the Zoning Code, the minimum lot width is measured at the front
yard setback, which is typically 40 feet from the front property line. Because the
submitted proposal includes a variance request to reduce the front yard setback
requirement, the plat map is measuring the lot width at the 30 foot setback line. If
the variance is denied, a 40 foot setback does not appear to cause any of the
properties to have a nonconforming lot width, though additional review may be
required.
Due to its shapes, Lot 3 Block I is somewhat nnique. In the R-3 Zone, the
minimum lot width is 85 feet for an internal lot 95 feet for a comer lot. However,
the Subdivision Code is not clear on how that requirement applies to comer lots
with irregular shapes that result in ambiguous front property lines. By
comparison, Lot 7 of Block 1 and Lot 9 of Block 2, are traditional comer lots with
a clear front property line (both of these lots are at least 95 feet wide at the 30 and
City of Arden Hills
Planning Commission Meeting for June 6, 2007
\\Metro-inet.us\ardenhillslPlanninglPlanning Cases\2007\07-014 Hazelnut Subdivision 3 Preliminary Plat - Final Plat - Variance
(PENDING) \051807 - PC Report - Hazelnut Park 3 - Plat and Variance. doc
Page 5 of 15
40 foot setback lines). A lot approved in the first addition, 3322 Katie Lane, is
very similar in shape and size to Lot 3 Block 1.
The Zoning Code defines the front property line as: "The boundary of a lot
abutting a street. On a comer lot, the shortest street lot line shall be the front lot
line." In the case of Lot 3 Block I, the property line adjacent to the street is
curved and continuous without a clear change from a front to a side property line.
Ifthe entire length ofthe property line adjacent to the street is designated as the
front property line, the length would be 165.88 feet (from the 30 foot setback
line), which is well above the minimum 95 foot width. The western side property
line is 139 feet, which exceeds the minimum 120 foot length. The lot width near
the middle of the property is approximately 97 feet wide, as measured along a
straight line from northwest to southeast.
While it is somewhat difficult to directly apply the subdivision regulations to Lot
3 Block I, the lots appears to meet the spirit and intent of the Subdivision Code
and is not out or character with other lots in throughout the Hazelnut Park
subdivision. Depending on the orientation of the structure, the rear property line
and setback could be assigned to the shared property line with either Lot 2 or 4.
The rear property line will be determined during the building permit review
process. Nevertheless, a dwelling of substantial size that respects all setback
requirements could still be constructed. The front setback requirement will apply
to the entire length ofthe property line that is adjacent to the street.
B. Setbacks - Meets requirements
With a 30 foot front yard setback, all sixteen properties are buildable without any
additional variances. All side and rear property setbacks can be met on the
proposed lots. There are not any additional setbacks from the edge of easements.
C. Coverage Limits - Meets requirements
All sixteen of the proposed lots are capable of accommodating a structure and
other improved surfaces without exceeding the impervious coverage limit. Up to
25 percent of the lot can be covered with structures and up to 35 percent ofthe
lots can have impervious surfaces.
2. Subdivision Ordinance -
A. Street Design and Utilities (Section 1130.03 & 1140.05)
The developer will be responsible for constructing the road and installing all
utilities in the subdivision. The City Engineer's is reviewing the draft road and
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inet.uslardenhillslPlanning\Planning Cases\2007107-014 Haze/nut Subdivision 3 Preliminary Plat - Final Plat - Variance
(PENDING)\051807 - PC Report -Haze/nut Park 3 -Plat and Variance. doc
Page 6 of 15
utility plans; however, no changes are expected to the overall layout of the plat.
The Engineer's review notes that the applicant will need to acquire certain
permits, which are needed prior to any work being done on the property
(Attachment 3C-2). The utility drawings will be finalized depending on the
outcome ofthe design ofthe plat from the Planning Commission/City Council
revIew.
The Subdivision Code requires a 60 foot wide right-of-way and a minimum 28
foot wide pavement width, both of which are provided for in the submitted plans.
The City Engineer has verified that there will be sufficient line of sight for
approaching traffic at the proposed Cleveland AvenuelKatie Lane intersection.
The City Attorney will be reviewing a developer's contract prior to the City
Council's review of the subdivision proposal. That contract will outline the final
specifications for all roads, utilities, drainage/stormwater provisions, and
performance guarantees in the subdivision. The final detailed utility and road
designs are subject to City requirements as well as City Engineer and Public
Works Director approval and inspection. The City Engineer and Public Works
Director are working with the applicants to ensure that submitted designs meet
City requirements. The development contract will require Council approval
before the plat is executed. The new extension of Katie Lane would become a
public street provided it meets all City design requirements.
B. Easements (Section 1130.05 and 1130.08)
City subdivision regulations require twelve (12) foot wide utility and drainage
easements dedicated to the City along the right-of-way and centered on common
lot lines. The plat includes all of the required drainage and utility easements
along lot lines.
The subdivision regulations require all ponding and drainage areas to be included
in drainage easements that are dedicated to the City. The plat includes three
stormwater ponds (two infiltration ponds and one existing lowland) and an
existing open water wetland. Block 2 Lots 5 and 9 will have a constructed
infiltration pond inside of a drainage easement. Block 2 Lot 6 will have a
stormwater pond inside of an easement. The existing pond is located on Outlot A
and will be incorporated into a drainage easement. of Block 2. The City will have
direct access to all ofthe pond and drainage area for maintenance.
The City requires storm, sanitary, and water mains that cross private property to
be within an accessible easement. There will be a storm sewer pipe between Lots
4 and 5 of Block 2. The minimum easement width for such an easement is twenty
feet; however, the applicant is providing a 25 foot wide easement on the plat.
City of Arden Hills
Planning Commission Meeting for June 6, 2007
IlMetro-inet.us\ardenhillslPlanninglPlanning Cases\2007\07-014 Haze/nut Subdivision 3 Preliminary Plat-Final Plat - Variance
(PENDING)\051807 - PC Report - Hazelnut Park 3 - Plat and Variance.doc
Page 7 of 15
C. Park Dedication (1130.08 Subd 2)
The park dedication requirement for this entire subdivision was satisfied in 1975
with a 10.3 acre land dedication to the City. The land dedication was used to
create Hazelnut Park, which is immediately east of the proposed subdivision. The
City Attorney has reviewed the 1975 land transfer documents and the 1983 and
1992 plat approval documents and has determined that the 1975 dedication does
apply to the third phase of the Hazelnut Park subdivision. Therefore, the City
cannot place any additional park fee or land dedication requirements on this
subdivision proposal.
D. Trees (Section 1140.05 Subd 4)
The Subdivision Code requires the following (Section 1140.05 Subd 4.A):
A. Each lot shall be provided with a minimum of three (3) trees to be
placed in the front yard. They must be placed inside the property line and
not in the boulevard unless approved by the city engineer. The type of
tree shall be subject to city approval (The city will provide a list of
species). Coniferous trees must be at least six (6) feet high and deciduous
trees must be at least two and one-half (2 1/2) inches in diameter at the
time of installation. This requirement may be waived by the city where
the applicant can demonstrate that a suitable tree having a minimum
diameter of two and one-half (2 1/2) inches for deciduous and six-foot
height for coniferous and four (4) feet above the ground is located in an
appropriate location on the lot.
There are trees scattered throughout the property, and some of the lots may not
need additional trees in the front yard. For those lots without at least three trees in
the front yard, the developer will need to provide the trees. Since it may be
prudent to wait to plant the trees on a particular lot until the road construction,
utility work, and individual home construction is completed, the tree requirement
can be incorporated into the development contract. The trees can then be planted
after road and utility work is completed, or, if more appropriate, as the individual
lots are developed.
E. Development Contract (1140.04 Subd 2)
The City can take the responsibility of constructing the street, drainage, and utility
system of new subdivisions. However, Section 1140.04 of the Subdivision Code
allows the applicant to install the required improvements subject to City
requirements and inspections:
City of Arden Hills
Planning Commission Meeting for June 6, 2007
\\Metro-inet.uslardenhillsIPlanninglPlanning Cases\2007107-014 Hazelnut Subdivision 3 Preliminary Plat -Final Plat - Variance
(PENDING)\051807 - PC Report - Hazelnut Park 3 - Plat and Variance.doc
Page 8 of15
Subd. 2. Alternative. ... the City Council may authorize the execution of a
contract between the City and the subdivider requiring the subdivider to
furnish and to construct the improvements at the sole cost of the
subdivider, in accordance with plans and specifications and usual contract
conditions approved by the Council, which shall include provision for
supervision of details of construction by the city engineer, and grant to the
engineer authority to correlate the work to be done under the contract with
other improvements in the subdivision which may be constructed by the
City under contract with others. The subdivider as contractor shall furnish
a surety bond with penalty equal to 1.25 times the cost of the
improvements to be made under the contract as estimated by the city
engineer, which bond will be in form required by statute for public
contractors bonds and will identify the improvements and the time
schedule for their completion.
The developer will be taking on the responsibility of installing all road, utility,
and drainage/stormwater work. As noted, the City Attorney is working with the
developer to draft a developer agreement, which will outline the technical
requirements. The agreement is subject to City Council approval.
3. Rice Creek Watershed District.
The Rice Creek Watershed District (RCWD) is charged with reviewing and approving the
drainage plan. The review application was submitted on May 3,2007, to RCWD. Since the
City's and RCWD's review period overlap, it is not uncommon for applications to obtain
RCWD after the City review process. Executing the final plat will be subject to RCWD
approval. If RCWD requires any changes to the layout of the lots in the subdivision, a
revised application would be brought back to the Planning Commission.
4. Additional Plan Review
The City Attorney, the Building Official, the Fire Marshal, and the City Engineer have
reviewed the subdivision and variance proposal. The City Attorney did not have any
comments regarding the design ofthe proposal.
The Building Official did not have any comments impacting the overall design of the
proposal. He did note that the 33 foot wide pipeline easement shown on Lot 7 Block I may
have been vacated. If it has been vacated, it is unlikely that the vacated easement would
impact the design of the subdivision.
City of Arden Hills
Planning Commission Meeting for June 6, 2007
IlMetro-inet.uslardenhi//slPlanninglPlanning Cases\2007107-014 Hazelnut Subdivision 3 Preliminary Plat - Final Plat - Variance
(PENDING)\051807 - PC Report - Haze/nut Park 3 - Plat and Variance.doc
Page 9 of IS
The Fire Marshal has reviewed the subdivision application and did not have any objections or
changes to the proposal.
The City Engineer's technical revIew IS ongomg, but no changes to the layout of the
subdivision are expected.
5. Granting a Variance to the Zoning Code
The applicant has requested a blanket variance for the third phase of this subdivision to allow
for a 30 foot front yard setback instead of the 40 foot front yard setback as required in the
Zoning Code. Phase one of the subdivision was granted a blanket front yard setback variance
and that variance was extended to the second phase. The City Attorney has determined that
the original variance approval from 1983 has expired, which is why the applicant has
submitted a new request. Previous variance approvals do not require the City to approve this
variance request. The variance request must be evaluated based on current State Statutes.
The applicant has submitted a letter addressing the variance criteria (Attachment 3C-I).
The criteria listed below must be used to evaluate the variance request. Staff has provided
suggested findings offact in the following section.
A. Variance Review Criteria- Section 1355.04 Subd. 4.C:
Variances from the literal provisions of the Zoning Code may be granted in instances
where the strict enforcement would cause undue hardship because of circumstances
nnique to the individual property under consideration. Variances shall only be
granted when it is demonstrated that such actions will be in keeping with the spirit
and intent of the Code. "Undue hardship," as used in connection with the granting of
a variance, means:
. The property in question cannot be put to a reasonable use under
conditions permitted by the Zoning Code;
. The plight of the landowner is due to circumstances unique to the property
not created by the landowner;
. The variance, if granted, will not alter the essential character of the
locality; and,
. Economic considerations alone shall not constitute an undue hardship if
reasonable use for the property exists under the terms of the Code.
B. Additional Review Information:
Although State Statutes include guidelines for evaluating variances, the
interpretation and meaning of those Statutes have been impacted by various court
decisions. A somewhat common, though apparently incorrect, interpretation of
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
HMetro-inet.uslardenhillslPlanninglPlanning Cases\2007\07-014 Hazelnut Subdivision 3 Preliminary Plat - Final Plat - Variance
(PENDING) \051807 - PC Report - Hazelnut Park 3 - Plat and Variance.doc
Page 10 of 15
the written Statutes is that a property owner must show that they do not have
reasonable use of their property without an approved variance. The difficulty
with this standard is what counts as "reasonable use" of the property? Since most
properties could be construed to have "reasonable use" without a variance, this
standard was declared virtually insurmountable by the Court of Appeals.
A revised interpretation of the "reasonable use" evaluation criteria has emerged
from the Minnesota Court of Appeals. According to the City Attorney, a property
owner does not need to show that reasonable use for a property only exists with
an approved variance. Instead, the landowner must only demonstrate that the
proposed variation is reasonable for a particular property in a given zone. For
example, the property owner must only demonstrate that an addition that
encroaches into a particular setback is reasonable as opposed to showing that the
property would only have reasonable use with the addition.
While this is a much softer interpretation of reasonable use, the applicant must
still address all four variance criteria listed above.
Findinl!s of Fact
Zoning Code Findings:
I. The lot layouts in the preliminary and final plat proposal meet or exceed all of the
requirements of the underlying R-3 Zone, including minimum lot size, lot width
(from a 30 or 40 foot setback), and lot depth.
2. All sixteen lots in the preliminary and final plat are capable of accommodating a
detached single family dwelling that meets all required setbacks and coverage limits
without any additional variances.
Subdivision Ordinance Findings:
3. The proposed lot layouts meet or exceed all of the requirements of the City of Arden
Hills Subdivision Code.
4. The extension of Katie Lane meets or exceeds the street layout requirements of the
Subdivision Code. The design of the road is subject to City Engineer and Public
Works approval.
5. All sixteen lots are adjacent to the public right-of-way and capable of supporting
separate driveways.
6. The final utility, road, and drainage plans are subject to City Engineer and Public
Works approval prior to any work being done on the property.
7. The plat proposal includes the necessary drainage and utility easements along lot lines
as required by the Subdivision Ordinance that will be dedicated to the City.
8. The drainage areas and stormwater pond areas are included in a drainage easement
that will be dedicated to the City.
City of Arden Hills
Planning Commission Meeting for June 6, 2007
\lMetro-inet.uslardenhil/s\PlanninglPlanning Cases\2007\07-014 Hazelnut Subdivision 3 Preliminary Plat -Final Plat - Variance
(PENDING) \051807 - PC Report -Hazelnut Park 3 - Plat and Variance.doc
Page 11 of15
9. The park dedication fee was satisfied in 1975 and no additional park dedication fee is
required with this subdivision.
10. The proposal has been submitted to the Rice Creek Watershed District for review.
Variance Findings
11. The blanket ten foot front yard setback reduction is a reasonable use in the R - 3 Zone
because it continues the style and type of development in other parts of the R-3 Zone.
The other parts of the Hazelnut Park subdivision have smaller front yards in favor of
larger rear yards.
12. According to the applicant, there are nnique circumstances related to the topography
and location of the parcel that has created a hardship that warrants approval of the
blanket ten foot front yard setback variance. Approving the variance would reduce
the impact of the hardship. The applicant has submitted the following findings of
fact:
1. The land has steep rear slopes on Lots I, 2, 4, 5, 6, and 7 of Block I;
11. Wetlands in the rear of Lots 7 and 9 of Block 2;
111. Lots 1-5 of Block 2 are bordered by the City trail and power line.
13. The ten foot front yard setback reduction would not change the character of the
neighborhood. The setback reduction would continue the neighborhood character, in
terms of dwelling location, of the Hazelnut Park #1 and #2 subdivisions.
14. The variance reduction is not based on economic considerations alone. The request is
based on the character and style of the surrounding development as well as
topographical and location difficulties.
Staff Recommendation
Based on the fifteen findings of fact related to the Preliminary Plat and Final Plat proposal, Staff
does recommend approval of the Preliminary and Final Plat subject to the ten below conditions.
As discussed in past planning case reports, evaluating variance applications based on the criteria
in State Statutes can be a difficult endeavor. Although past variance approvals do not set
precedent for current variance applications, Staff is of the opinion that it is important to continue
the neighborhood character set in the first and second phases of the Hazelnut Park subdivision
provided that the State Statute variance evaluation criteria are met. The variance letter
submitted by the applicant and the four findings of fact related to the variance (findings 11-14)
do appear to meet the requirements set by State Statutes. While a different interpretation of the
findings may be reasonable, Staff is recommending approval of the blanket variance to reduce
the front yard setback by ten feet from 40 to 30 feet.
Staffs recommendation for approving the Preliminary Plat, Final Plat, and Variance is subject to
the following ten conditions:
. City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\lMetro-inet.uslardenhillslPlanninglPlanning Cases\2007\07-0/4 Hazelnut Subdivision 3 Preliminary Plat-Final Plat - Variance
(PENDING) \051807 - PC Report - Haze/nut Park 3 - Plat and Variance.doc
Page 12 of15
1. The applicant shall submit an approved road access permit from Ramsey County to
the City before any work begins for the construction of Katie Lane.
2. Any changes to the grading or erosion control plan shall be subject to approval by the
City Engineer before any changes are implemented.
3. The applicant shall obtain all necessary permits from the Rice Creek Watershed
District, Ramsey County, the Metropolitan Council, the State of Minnesota
Department of Natural Resources and any other governing agencies where applicable
before the final plat is executed.
4. The applicant shall provide an as-built survey upon completion of the project.
5. The applicant shall submit updated title work prior to the City Council review of the
Plat.
6. The developer's agreement shall be reviewed by the City Attorney and approved by
the City Council before the City Council executes the Final Plat.
7. The applicant shall supply three new trees for each lot in the subdivision. Credits
may be given for lots with existing healthy trees. New coniferous trees shall be at
least six feet tall and deciduous trees shall be at least two and one half caliper inches.
The plantings may be phased with lot development provided the phasing is included
in the development contract. The applicant shall submit a tree planting plan prior to
execution ofthe final plat.
8. The proposed extension of Katie Lane shall start at Cleveland Avenue and be built to
the current ending of Katie Lane in order to reduce truck, noise, and dust impacts on
the existing residential properties and to reduce wear on Katie Lane.
9. The applicant shall be responsible for repairing any damage done to Katie Lane
and/or paying the cost of fixing any damage done to Katie Lane during the road,
utility, and drainage/stormwater system construction process. All repairs shall meet
City standards and will be subject to City Engineer approval and inspection.
10. All of Outlot A shall be incorporated into a drainage easement and shall be deemed
not developable.
Resident Comment
Staff has not received any official letters or telephone calls from property owners or occupants in
regard to this planning case.
Notice
A notice was sent to all properties within 500 feet of the subject property (Statutes typically
require only require notice to properties within 350 feet). Notice was also published in the
Shoreview-Arden Hills Bulletin.
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inet.uslardenhillslPlanninglPlanning Cases\2007\07.014 Haze/nut Subdivision 3 Preliminary Plat - Final Plat - Variance
(PENDING)\051807 - PC Report - Hazelnut Park 3 - Plat and Variance. doc
Page 13 of1S
Options
The preliminary/final plat could potentially be approved without approving the variance. Since
the findings of fact currently support approval of the variance, alternative findings that address
the variance evaluation criteria would need to be stated for the record before a motion to deny
the variance is made.
If the preliminary/final plat is not approved, the variance cannot be approved.
1. Recommend Approval with Conditions: Motion to recommend armroval of Planning Case
07-014 for a Preliminary Plat, Final Plat, and Variance for the Hazelnut Park #3 Subdivision
based on the findings of fact and the submitted plans as amended by the ten conditions in the
June 6, 2007, Planning Case report.
2. Recommend Approval as Submitted: Motion to recommend armroval of Planning Case 07-
014 for a Preliminary Plat, Final Plat, and Variance for the Hazelnut Park #3 Subdivision
based on the findings of fact and the submitted plans in the June 6, 2007, Planning Case
report.
3. Recommend Denial: Motion to recommend denial of Planning Case 07-014 for a
Preliminary Plat, Final Plat, and Variance for Hazelnut Park #3 Subdivision based on the
following findings: findings to deny should specifically reference the reasons for denial and
why those reasons cannot be mitigated.
4. Table: Motion to table Planning Case 07-014 for a Preliminary Plat, Final Plat, and Variance
for Hazelnut Park #3 Subdivision: a specific reason and information request should be
included with a motion to table.
Deadline for Al!cncv Actions
Preliminary Plat and Final Plat
The City of Arden Hills received the completed plat application for this request on May 18,
2007. Pursuant to Minnesota State Statue 462.358 Subd 3b, the City shall approve or disapprove
the plat within 120 days following delivery of an application completed in compliance with the
municipal ordinance by the applicant to the municipality, unless an extension of the review
period has been agreed to by the applicant. The City must make a final decision on the
application no later than August 18,2007.
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
IlMetro-inet.uslardenhillslPlanninglP/anning Cases\2007\07-014 Hazelnut Subdivision 3 Preliminary Plat -Final Plat - Variance
(PENDING)\051807 - PC Report - Hazelnut Park 3 - Plat and Variance.doc
Page 14 of 15
Variance
The City of Arden Hills received the completed application for this request on May 18, 2007.
Pursuant to Minnesota State Statute, the City must act on this request by July 15, 2007 (60 days),
unless the City provides the petitioner with written reasons for an additional 60 day review
period. The City may with the petitioners' consent extend the review period beyond the 120
days.
Attachments
3C-I
3C-2
3C-3
3C-4
Application and Supporting Materials
City Engineer Review
Air Photo and photographs ofthe site
Plat Maps and Supplementary Plans
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro~inet.us\ardenhills\P/anninglPlannjng Cases\2007\07-014 Hazelnut Subdivision 3 Preliminary Plat- Final Plat - Variance
(PENDING)\051807 - PC Report-Hazelnut Park 3 - Plat and Variance.doc
Page 15 of 15
Attachment 3 C-l
Application and
Supporting Documents
~
~HILLS
June 6, 2007, Planning Commission Meeting
~
~~HILLS
1245 West Highway 96
Arden Hills, Minnesota 55112
Telephone (651) 792-7800
Fax (651) 634-5137
www.ci.arden-hills.mn.us
For Office Use Only
Planning Case No.
Submittal Date
Application Completed Date
Accepted by
Receipt Number 27
Council Decision
Council Decision Date
2007 LAND USE APPLICATION
Applicant Information
BARRY O'MEARA
Applicant:
1874 Brenner Avenue Roseville, MN 55113
612-860-4368 I Other:
Address:
Telephone No.:
Fax No.:
Email Address:
Property Information
Property Owner:
Owner Address:
Owner Telephone No.
Address of Property Involved:
Legal Description:
Property 10 No.:
Type of Use:
Zone:
BARRY O'MEARA
1874 Brenner Avenue Roseville, MN 55113
612 -860-4368 I
Other:
SOUTH END OF KATIE LANE
SEE PLAT
RESIDENTIAL
R-3
I Property Acreage: 6.5
Type of ReQuest*
o Apportionment of Assessments ($30)
o Comprehensive Plan Amendment ($400)
o Conditional Use Permit or Amended CUP ($300)
I:RI Final Plat ($200 + $25 per lot) $600.00 + $1000 escrow
o Final Planned Unit Development ($200)
o Master Planned Unit Development ($600 + escrow)
o Minor Subdivision (lot split/consolidation) ($300)
o Preliminary Plat ($400 + $25 per lot + escrow)
o Rezoning ($400)
o Site Plan Review ($400)
o Site Plan Review (Sign or Fence) ($250)
o Vacation of Easement or Right-of-Way ($250 + escrow)
W-Variance (Zoning Code) ($300)
I!I Zoning Code Amendment ($300 + escrow)
Revised: 01-30-07
.Page [ of3
<Applicants are responsible for
reimbursement of consultant fees associated
with filing, reviewing, and processing of this
application. Such fees are to be paid in
escrow up front or upon receipt of statement
from the City of Arden Hills. Fees include
costs for consultants retained by the City and
include consultant planning services, attorney,
and engineer. <Payment of park dedication
fees are required with the approval of most
subdivision applications.
<The land use application fees do not cover
building, sign, or other permit fees that may
be required upon approval of a land use
application.
<Certain applications are subject to review
and approval by the Rice Creek Watershed
District. Contact RCWD directiy at 763-398-
3070 for additional information.
Brief Description of Request (olease also include a tvoed. detailed letter explaininq the proiect):
Request - to final plat 16 lots in Hazelnut Park. This project is the final phase of Barry O'Meara's
Hazelnut plat. The final plat consists of approximately 6.5 acres. This area is proposed for 16 single
family residential homes, which is consistent with current zoning. The preliminary plat was previously
approved.
This project will consist of installing watermains, sanitary sewer, storm sewer, storm ponds, street with
curb & gutter, and associated appurtenances.
FilinQ & Information Requirements
The City requests that you make a pre-application meeting with the City Planner to discuss the
application process, requirements, and deadlines. Unless waived by the City Planner or Planning
Commission, a certified survey of the property is required for all applications. The Planning Commission
and/or City Council may still require a certified survey. A checklist for other required information is also
available.
Complete/Incomplete Applications
An incomplete application will delay the processing of land use requests. The application approval time
commences and an application is considered officially filed' when the City Planner has received and
examined the application and determined that the application is complete. A decision on whether the .
application is complete or incomplete shall be made within fifteen (15) working days following the
submittal of the application. When the application is deemed to be "complete" it shall be placed on the
agenda of the first possible Planning Commission meeting provided that all required public notices have
been sent and published.
Payment of Fees
The undersigned acknowledges that she/he understands that before a land use application can be
deemed complete. all required information and fees (including all deposits) must be paid to the City. If
additional fees are required to cover costs incurred by the City, the City Planner has the right to require
additional payment from one or more of the undersigned, who shall be jointly liable for such fees. Such
expenses may include (but are not limited to) direct city payroll and overhead costs, fees paid to
consultants and other professionals, and the cost of printing, mailing, and supplies. The City may
withhoid final action on a land use application. withhold building permits, and/or rescind prior action unlii
all miscellaneous fees have been paid. Applicants are advised that an escrow deposit is required at the
time of the submittal of the land use application to offset costs associated with the proposed project.
Unused portions of an escrow are returned to the applicant upon successful implementation of an
approved plan.
Notice of MeetinQ Attendance
In order for the Planning Commission and the City Council to consider any application, the applicant or a
designated representative must be present at the scheduled meeting. If not, the matter may be tabled
until the next available agenda.
Revised: 01-30-07
Page 2 of3
Aaenda Deadline and MeetinQ Schedule
The deadline for submittal of land use applications is required according to the scheduie outlined below.
There are no exceptions. Planning Commission meetings are typically held on the first Wednesday of
each month at 7:00 PM, though please contact City Hall to verify the meeting date and time. City Council
meetings are held typically the last Monday of the same month at 7:00 PM. Meetings are held in the
Council Chambers at the City of Arden Hills, 1245 West Highway 96, Arden Hills, Minnesota 55112,
unless otherwise stated. Applicants are advised that additional meetings and/or workshops are
scheduled when necessary upon approval of the Planning Commission.
2007 SCHEDULE (*subject to change)
TENTATIVE
CITY COUNCIL
MEETING
DATE'
(Generally held on the
last Monda at 7:00 .m.
AcknowledQement and SiQnature
I acknowledge that I have read all of the information listed in the City of Arden Hills Land Use Application
and fully understand that I am responsible for all costs incurred by the City related to the processing of
this application.
CBtA c/ ~
Property ~ Signature (Required)
5/1/0 ?
Date'
Applicant Signature (If different than the property owner)
Date
Please contact the City Planner at (651) 762-7819 or by email atiames.lehnhoff@cLarden-hills.mn.usif
you have any questions regarding this application.
Additional copies of this application form are available on the City's webs/te:
htto:/iwww.ci.arden-hills.mn.us
Revised: 01-30-07
Page 3 of3
!\,
Mateffy Engineering, Inc.
628 OLD HIGHWAY 8 N.W.
NEW BRIGHTON, MN 551 12-7767
[651J 636-6166, FAX (651 J 636-2100
May 17, 2007
City of Arden Hills
Attn: The Honorable Planning Conunission and City Council
1245 W Hwy 96
Arden Hills, MN 55112-5743
RE: Requested 30 foot setbacks for Hazelnut Park 3
Dear Planning Commission & City Council,
On behalf ofMr. O'Meara, please consider this variance rcquest. Mr. O'Meara is requesting that he be
allowed to have 30 foot front yard setbacks on his property as originally agreed by the City Council. His
request is based on the following facts.
I) Use of the property - The property needs 30' front yard setbacks to harmonize with the existing
neighborhood (30' setbacks) and have adequate rear yards, for family activities. Smaller rear yards
will prevent reasonable use ofthe property for single family units as previously approved by the City
Council.
2) The need for the variance is caused by the challenging features of the land. The land has steep rear
slopes on lots, 1,2,4,5,6,7 Block 1, wetlands in the rear on lots 7 & 9 Block 2, and lots 1 through 5
Block 2 are bordered in the rear by a City trail and Power line.
3) The requested deviation from the ordinance will still maintain the harmony of the neighborhood and
intent of the City ordinance. 30 foot setbacks are quite common throughout many cities in
Minnesota.
4) The requested variance will not allow any currently un-permitted land use in the subject property.
5) The variance requested will not alter the character of the City or the neighborhood. In fact it will
help integrate the original phases of Hazelnut Park with the final phase by maintaining the same
front yard setbacks and similar population density.
6) The requested variance is not for economic reasons. The variance is being requested to maintain the
character ofthe neighborhood, allow reasonable use of the rear yards, and help buffer wetlands,
steep rear slopes, City trail, and power transmission line.
7) The proposed use, subject to approval of the variance request, will be single family homes similar in
nature to the homes in the original phases of Hazelnut Park. This type of housing is much less
intensive than other uses also permitted by the current zoning.
8) Mr. O'Meara's would have developed the property differently had the City Council indicated 40'
front yard setbacks would be required. Mr. O'Meara and his attorney believe that his original
variance is valid as it specifically applies to an lots in the subdivision.
WonUnl1m/ardeJ' hillslh<r.:elmflpIdOS_/6_07 I'r/o Ping r''''''mi<J'ity G.lI'''_''-'
In Summary, granting this variance request will enable reasonable use of the property and enable the
developer to maintain the harmony of the neighborhood. This can aU be accomplished while maintaining
the intent of the City ordinances.
If you have any questions please do not hesitate to contact me.
Sincerely,
U ~ lJf?#
Leslie H. Mateffy PE
Mateffy Engineering, Inc
Enclosure
LHM: trn
Cc: Mr. Barry O'Meara
Word/mun/"rden hUlsllllr;:e!lIlll pklOS-/6-lJ7/rrro Pi"g Commis-Ciry Co,,,,cil
i\\
Mateffy Engineering, Inc.
628 OLD HIGHWAY B N.W.
NEW BRIGHTON, MN 55112-7767
(651) 636-6166, FAX (651) 636-2100
May 3, 2007
Rice Creek Watershed District
Attn: Ken Powell
4325 Pheasant Ridge Drive, Suite 611
Blaine, MN 55449
RE: Application for Hazelnut Park #3
Dear Mr. Powell,
Please find enclosed application, permit fee, plans, specifications, and stormwater calculations for the above
project. If you need any additional information please do not hesitate to contact me.
Sincerely,
U/)/.
LeslieH. Mateffy PE
Mateffy Engineering, Inc
Enclosures
LHM: tm
Wordlmun/arden Mllslh""'cbw,pk/OJ_03_071tr to Rice Cred WS
RICIE (:RIEIEK W A TIERSHIED DISTRICT
For Office Use Only
Permit Application Number:
Date Received:
4325 Pheasant Ridge Drive, Suite 611
Blaine, Minnesota 55449
Phone (763 )398-3070 / Fax (763) 398-3088
Permit Application
Project Information
Amount Received: S
Permit Fee: $
Project Name:
HAZELNUT PARK #3
Project Location: ARDEN HILLS I MN
City or Township: Arden Hills
sw 1/4 of section:
Project Purpose:
33
Coun~:Ramsey County
Township: 30 N Range:
23
w
CREATE 16 RESIDENTIAL SINGLE FAMILY HOME SITES
Contact Information
(all contacts will receive permit status updates)
Applicant (must sign application on reverse):
Name: MR. BARRY O'MEARA
Address: 1874 BRENNER AVE
Company:
B. O'MEARA CONSTRUCTION, INC.
Phone: (612) 860-4368
Fax: (651) 633-3l43
e~mail:
City:
ROSEVILLE
State: Minnesota ZIP: 55113
Permitting Contact (engineer, architect, etc.):
Name: LES MATEFFY
Address:
City: NEW BRIGHTON,
State: Minnesota
Other Permitting Contact:
Name:
ZIP:SSU2
Company: MATEFFY ENGINEERING, INC.
Phone: (651) 636-6166 Fax: (651) 636-2200
e-mail: les@mateffyeng_com
629 OLD HWY 8 NW
Address:
City:
State:
ZIP:
Company:
Phone:
e-mail:
Fax:
Permit Fee
(Check all that apply)
o Single Family- House/Addition/Accessory Building ($150) 0 Street & Utility Plans ($1000)
Final Site Drainage Plans:
Commercial/Industrial / Insrituriona1 Plans
o <1 acre impervious surface (S1000)
o h2.5 acres impervious surface (S2000)
0>2.5 acres impervious surface($4000 + $500fadditional acre)
Acres of additional impervious surface (beyond 2.5):
Bridge I Culvert Crossings:
Public Road Crossing
o Rice, Clearwater, or Hardwood Creek ($2000)
o County/Judicial Ditch ($1500)
o Other ditch or creek ($SOO)
o Single Family Driveway ($500)._
Wetland Impact Replacement plan:
o Exemption ($500)
o <lacre($750)
o 1-5 acres ($1250)
0:> 5 acres ($2500)
o Bank;ng($2000}
Land Development Plans:
Residential Subdivisions
o < 10 lots ($500)
o 10-49 lots ($1250)
o 50-99 lots ($3750)
o 100-199 Lots ($7500)
0>200 lots ($7500 + $25/additionallot)
Total numberofaddirional lots: (beyond 200):
NOTE: Permit fee is the cumulative total of an individual aspects of a project checked above.
Government entities are exempt from permit fees.
o Public Ditch Alteration Plan ($2500)
CWMP - Rule M Compliance plan:
Parcel Area:
o 0~4.9 acres ($750)
05-9.9 acres ($1000)
o 10-24.9 acres ($1500)
025.49.9 acres ($2250)
050-99.9 (53500)
o > 100 acres($5000)
o Public Water/Wetland Shoreland Alteration Plan ($1 SO)
Permit Fee: $1 r 250
Submittal Requirements
Complete applications must be submitted 20 calendar days prior to the regular Board of Managers meeting. generally the fourth Wednesday of
each month (check website for exact meeting dates). Applicants must submit 3 copies of all required information as specified in our Rules (see
website. for complete rules or contact the office for a printed copy). Projects involving a Wetland Replacement Plan have special noticing
requirements and require the submittal of 8 copies of all wetland,related submittal materials_ Due to the noticing requirements, applications
involving a wetland replacement plan must be submitted at least 39 calendar days prior to the Board Meeting;
Applicant Signature
"I understand that, as the permittee, I am legally accountable to ensure compliance with terms and conditions of the permit. I understand that I
am not authorized to begin the project untill receive the permit and the permit sign is posted on site. If-the project is modified,-I will.obtain
approval by the Rice Creek Watershed District before I continue with the project. I authorize the District, and its agents, employees, officers and
contractors, to enter the project to perform any inspections or work authorized by the permit or any applicable law."
"I certify that I have thoroughly read and understand the above information."
00.
/4...-zc"--
of permitee or designated agent
nts without a letter of authority)
0- ,~-() 7
Date
O>(T~
f) {\l\eC1.lfo......
Print signer's name
~ Successful Bidder
(for public prOjects only)
Successful Bidder Signature
"I understand that, as rrhe successful bidder, I am legally accountable to ensure compliance with terms and conditions of the permit. I
understand that I am not authorized to begin the project until I receive the permit and the permit sign is posted on site. If the project is
modified, I will obtain approval by the Rice Creek Watershed District before I continue with the project. 1 authorize the District, and its agents,
employees. officers and contractors, to enter the project to perform any inspections or work authorized by the permit or any applicable law."
"I certify that I have thoroughly read and understand the above information."
Signature of successful bidder or designated agent
(no agents without a letter of authority)
Date
Print signer's name
Company:
Address:
City:
State:
ZIP:
Phone:
Fax:
e-mail:
ReWD Permit
Application Form
Revised: 5/4/2005
Attachment 3C-2
City Engineer Review
~
~HILLS
June 6, 2007, Planning Commission Meeting
~
~
EN HILLS
MEMORANDUM
DATE:
May 24, 2007
TO:
James Lehnhoff, City Planner 1.1 /
Kristine Giga, Civil Engineer ~ H.L11 ./
Greg Haag, Public Works DirectoW'tt'l"
FROM:
SUBJECT:
Planning Case #07-014 Hazelnut Park Addition #3
The following are comments based upon a review of the submitted site plans dated April 30, 2007:
General
. The proposed project will require permits, including, but not limited to, NPDES, Rice Creek
Watershed District, Ramsey County and City Erosion Control permits.
. Plans and specifications are subject to City Engineer and Public Works Director Approval.
\\R VNASl \AHdala$\PR&Pw\Engineering\2007\PlanninL Cases\07-O 14 ~ HazelnutPark3rd.doc
Attachment 3 c- 3
Air Photo and Photographs of the Site
~
~HlLLS
June 6, 2007, Planning Commission Meeting
1>
c
,
13 .
~ .. ~jg~
i~~~! ~H~
~~8~H..d~~
~c'2(:;I!B'li$51ii.c:;.s
~:f f}. 6.sSl:i ~ VI a. ~Ul
it~ """"'.11110
.s
o
;;;
i~~L
o
o
5
..
'C
o
o
"
o
'0
." "
o "
~ <2
o ~
.~ >'8
Eg~
<S ~.t:
.S ~<
4~"
l5A..gl
"0_
~ g.~
"O~5
1::l4:l:"d
.g ~'f8
0" "
==<2'"0
8'] ~
8~]
:~ ~
.- 0 e
~; e
e:; 8
:.aa,.s
f-o..~
~~o
000
O-"N
gj::a
]~<
~ 0 .
oil ~
-""."
-8.E~
]~l5
] ~e
3"
.8 ~
o~u
008
" "
:g]"8
(Ilo~
>'." 0
~ @ ~
0"
"0
~lS a
8.-:: 0
o.~U
e~.2
"1:;I~t-
0.,,0
]a~
"00
~s(""j
.!:>"':C
]..e;<
.33'
000
i:J u~ 8
-"cO
'13'13 8
.~ ~H~
g.'~ ~
8'-'
"'.s]
~]f--
~rsb
f'l.Qo
;;;"N
@ <.g~
-' -
u 'C
'"
.....~i5<:
.... .
;b
~
o
a
~
'"
'"
~
o
'"
~
=
=
....
~
....
~
....
't:l
,.Q
=
0Ci.
..::.=:
'"
~
~
.....
=
=
-
Q,l
N
~
=
>;
5
!!.
~
H]f ~ H ~
l~iI"H ~~lii\i~
1';;..]l c;;1i <II '" <;>.; 8 )ljz
H8:s~Hhg!~
.s
o
;;!
"
.~
;;
.C
"
.
.ll
"" 0
d 0
. "
d oS
.g >.'8
~d~
.s~:a
.E~ ~<
-E S's
8 p..g
~8"'@
't) ~.~
8~:2
...0.....'"
",...1:::
=s,<E-o
e"" d
o~;
U ::I....
. " 0
.:2.J:Ji:)
0..3 e
e'~ ~
.~] ~
~ d<S
dJiS;b
a~~
~~:a
]~<
::g <L> . ~
<L>.s~
.c"",,
.s.5-tj
]]:5
"" ,,0
d ~ ~
.~ i3
oS"
.~ g 8
"O~'"d
a 0 a
i)'''O'O
~ Iii ~
. ~
.0
~iE "
dOO
g.~~
8'"d<8
"O~I""-
"-00
~a~
~:LB o~
~"M
.2:-"''t:
~.6<
-" " ..
~ 8 6
.s ,60
"<iJ'U 0
~ ~ g
.~.g ~
e~..:1
d
~i~.
~ th-
",00
~s~
:;:.gd'
~ M
~ :c
i5
o
~
"
CI
>>
~
ifJ
B
-
o
Z
"
~
:;;:
~
~ 'iJ . . ~
~ii]l?: ~H~
i".!i >o1<loE. .. E il;z
i~l~l~] ~ ~ ~ Ii
'\\'\\1.0
~J
-,...I G
~ vi
..
c<:
~
.....
=
=
-
Qj
N
c<:
==
.
"
.;;
o
:;:
"
.
.s
;;
.C
"
.
.
o
'0
-g "
. .
C <S
o ~
'~.i-8
6g~
<B ",'1::
.s~ ~ <(
"E~S
o o..g
g~-
... g.:g
'Oe~
=~"d
o <l)'-
.~:: ~
:;::<E"d
E'"g @
8~";j
~].~
.- 0 s
lij-;; E
s.,.... 0
.~ -g ~
t:: <'lA~
~~b
g~~
""-
o;j ",'J::
-g~<
~]lg
]~.f5
,Sl.E '"
]]]
] e~
.s ~
'S~<l)
~ g 8
.- .
"g,.g]
"'o~
"'." "
~ la ~
" "
" "
~~ =
go g
P,,'Eu
S.g,B
"O~t--
~"do
a:@~
""0
e:SM
.c"':a
i~<
~ ~.
.0"
."0
" ..
:€.[~
~ ;g g
.~ 0 g
p.:t:::$:
E~j
.~.EJ:l
~~E-<
ii~t--
~..2g
~.f!N
-.go
:J :;
U .C
'"
is <(
"
!
Ui
"'
u
[3
o
'"
Attachment 3C-4
Plat Maps and Supplementary Plans
~
~HILLS
June 6, 2007, Planning Commission Meeting
L
!
I
I
,
I
~=="" ".~.'1'
llESTQUAATER<:oRHD< I
sE;t::.33,T.30,R.2J I
,
,
,
-----,
I
I
I
I
I
----I
I
I
I
I
I
----,1
I
~~'t'J'fOHH'I1lRANT I
UEVAllON_9,:l.e:lF<Ef
I
I
I
I
----r'
I
I
I
I
I
I
I
I
I
I
w
=>
Z
W
>
<{
---
"I
gl
"
---,
I
\
)
ft------;------__
/
/
KA -riE COuRT
I,
I"
II
/1
\
~
'" /
, %
'" /2...
I /
'7--
.1.__
/1
II/--
Ill?
//l'o,.!2-
II t ~
I/<[S, 1\ \
t f ~
'A /1\ <>;
1/ I ~
( I
I I 'f f /
I 1;/ I
Q I I; I I
/;J//
/lljc:.,J
\ / I; /1>-,
/1/ \
/ /; / \
. /1 j
;,'
1\
I '
;\
1\
;f \
II
'"
"
,I
"
--l.,
I "
I
.1.,'
I ~\O
I
I
;1: _~___....
o
z
<{
--'
W
>
W
--'
()
BENCHliAAl(
TOP Of'N\JTON H'rOIWIT
WY^llON~l107.05fEU
\
\
/
""
~~
,.
o.
~g
;~
,"
li;lJi
~.
,
,
,
,
,
'i
,
OUTLOT
A
I
I
I
I
I
I
\
(
I
I
I
I
I
I
I
I
I
\
I
I
." ft
\ //./ / ,(
\ \ / / /" {;./ /',
\ / //1"/ /4 /' A ......
\ / ?/ / // I/,I
'I I/fl/)JY I
\ I / /' I / / 11..( 7\\
~ /-:.../,--1 / / 1/ ),,' /
~ f'\ .-/;:/,/ I" X' I \
" ", I " ,/' / II \
~....----------_...../ / /
I I I
I I I
I I I
I I I
J / So /
I I
I I L___
L_________L___L___
"
"
"
.
POND
/
/
I
,
,
,
"
"
: I
,\
,
DETAIL
l'rPICAI..".....""''''UT<nY
_r'<rAll
0'
~i
.,.,
,
,
.......sE'l'COUNTY"."~T i
S.WCORHEROf
SE:C.:lJ,T.30....2J
2007_1:lS 00/00 f.3O,F!.2J,s.3J 200713600I.dwg FRL
OWNERS:
Barry O'Meara
1874 Brenner
Roseville, MN
and Pamela
Avenue
55113
O'Meara
Tel: 651-633-0246
"""'-
1.) This survey does not purport to show ony under9round ut~itles.
2.) Contact. GOPHER STAlE ONE CALL at 651-454-0002 for precise onsite
locotionofulilitiespriortoonyexcovotion.
3.) This survey was prepored without the beneflt of current tille work.
Eosements, oppurtenances, ond encumbrance. may exist in addition to
thase shown hereon. Thlssurveyissubjecttorevisi<>nuponrecelptofo
current title Insurance commitment ar attorney's title opinion.
s.) Survaycoordinate basis; Ramsey County Coordinate S)Stem.
nr~(,~IPTlONOrPROPFflTY5lIR~
That port of the Southwest Quarter of Sect10n 33. Township 30, Ronge 23,
Ramsey County. Minnesota l)ln9 northerly of the southerly 997 feet thereof;
lying westerly of the N.S.P. eosement and lyin9 southerly of HAZELNUT PARK
A00l110N NO.2, subject to Cleveland Avenue
.IV
"
,
SCALE
,
IN
I hereby certify that this skelch, plan. or repart wes
prepared by me or under my direct supervision and
that 10m 0 duly Licensed Land Surveyor under the
Icws of the State of Minnesota.
Dated this 7th doyof May. 2007
SUNDELAN~~V1::Y1NG,LLCi/
,y._/Lf...t.4 t'b-.
Mork S. Hanson, P.L.S. Minn. Lie. No. 154BO
\
R~"~",,
By O<1t~
aro."v TItf~
FIrIAL PLATLAYOlffOF
HAZELMJT PARK ADDf1lON NO. 3
FOR
BARRY OMEAR4
"
f/S~e Land
l S1U'Veylng, LLC.
~~~~oom~~~~B.."'::;O~8
1l52-!lII1-2<lQS.F"""~-__9SW
1 ofl
001"" 05/07/2007
f'ropat2007-/JO
lJratmg:2001/.JG()()/.dwg
~H'
'2'
,
FEET
~
BARRY O'MEARA
-
DEVELOPER
ARDEN HILLS, MINNESOTA
HAZELNUT PARK ADDITION 3
LEGEND
PRO....ECT LOCATION
UNETYPES
,-
I _
SECTlONUNE
---------------------- QUARTERSE;OJONLlNE
------------------------------------------- ~~~N~E
- - - - - - - - - - - - - - - - - - - - - - - AO.IA.CENTPIlOF'elTYBOIJNOAAY
------------- ~IClHTOFWAy
------------------------------- PRIlPERTYUIIE
------------------- ------------------------- TOMPORAAYEASEMEIiT
PERM.....S<T~MENT
~,.
-----l_, $
"
a
EXISTING
EXlSll~CONTOlJR
WATElMAIN
HYDRAm2POflT
~-~
GATEVAl..VE
pL\lGV"'-VE
GUAROPOST
THAllSTEllDCK
_ ~> _>> _>> STOR/d&Wal
->->~o
o
@
o
>----<
(
e
FQR~MAlN
SANIfAAVSS\\'EA
-<=
co,lGfl!lA.SlN
Sl'OOMEJfIAlNMANKOLE
UFTSTATlDN
ClJl.\lERT
FlAREDENOSECTlON
".~
~~-GASUNE
-"-BlJRlS)ELECTRICAL
-P-OVERHEJlDEL.ECTRlCAL
-T-BUfUWTEl..El'HOIIE
-'-OVERHEADTB..EPl-lotlE
~ GASMsel
m G!>SVAl..VF.
~ PAIlMOUNfEOTRANSFOAo.II;R
CEJ POWERVAlllT
I!8llAANSIIlISSlONTOwel
-<:>- Ui1U1YPOI.E
E-- LmUlYPOLEANCHOA
o TEl&HONEI'l5ER
OJ TElEl'HONEFU$<fl
GENERAL
~SUSSTOf'
~~
c:cc:D IIOCKER\'
OSHAl.OJ
OTllU:/OEClOUOUS)
* TllEE(CONIFER)
.Ll. SIGN
'" ~~
OEfIJLORsa:TJQN X SPQTa&AllON
EB ... &NCHlIWlK
51 '~e~
e UONUMENTlNCAsE
@ 1d000000ENT(SU~FACE)
~=~
PROPOSED
PROPOSEOCOI<TOUR----'.",........-
WAT6IIolAlN-I-t-
HYDRANT:N'QRTA
HYOIlANT3-I'ORT.....
GATEVALVE).l
PWGVALVE It!
GlJARDPOST
lHRUSf BWCK -
~o~s~ ---->>~>>____
FOIICSMAIN--......_____
SANITAAYSE\<lER-;:'-;:'_
~.
CATC>laASlN .
STORMDRAlNMIINHlJl.E@
UFfSTAllONO
ClJl.VERT~
FlARSJENOSECl1ON)o
AIFRAP ..
GAslmE~G-
8UR!EOEI.E:TI1lCAl.-P-
OVERHEADs.s::TRICAl.-P_
BlIAIEOTBE'HONE-T_
{]VEFlHEAOTElS'HONE-T-
GASMETHlt:l
GASVALVEIl
PAOI.lOUNTEDTFWlSFORldS<0
POWERVAlllTll'J
TFWlSMISSlOIHtM'ER 181
UTIUTYPOLE_
UTlUNI'OLEANCHOR --')
TB..EPHONERlSS'! .
TaEPt<OIIEAlSSR1JJ
ENVIRONMENTAL
5OlI.BORI"Ge
=~..
MONITORINGWEU.-0
SUPPLYWEU.0
EmW:TlON/EltwATERlIfGWELLllI
OEWATERlNGPlECOVEllYWEl..L2
VAPORPHASEMomtlAINGWElL .
,oJllSPARl/IIGW8..LO
l-WIOAl!G8lBOlUNG e
ABOVEGRADEMONI\ORIOGWEU. <It
ATGAAOEIdOMIDlllNGWELL .r!!-
SOlLSAAlPl.ELOGI<l1ON ...
VAPORSAMPlEI.OCAll0N .
IN\IESl1(O.1,TIONSYOl1lERS@il
PROJECT
LOCATION
SHEET
INDEX OF DRAWINGS
DESCRIPTION
1
2
3
4
5
6
7
.
9
10
COVER SHEET
SITE MAP
PLAN AND PROFILE 1
PLAN AND PROFILE 2
GRADING PLAN
EROSION PLAN
SANITARY SEWER DETAILS
STREET AND STORM DETAILS
WATERMAIN DETAILS
INFILTRATION BASIN DETAILS
FOR REVIEW
" ! ~
,!
., ,
~ ~ ! ~
,. ~ ,
"'
" , ! ~ ,
,. !
~ ~ ~ ~
,. ~
,0 1
E.~ ,
"liz " ~
~i!!;::~ ~
!~~l!!~
~~nS~
~i~h~
2~gE~~
~~~ii~g
iii~~~~
,,~ 3
Zl~gJ~
Z~~ ~~
trj!U
~S~",:>
~~F~
;>,
.
z ,
0 ,
.
~ ,
~ !
z
0
E ;
g
< ,
. .
.. .
= W
;~ ~
t: A. Eo
'C ~2
(I) ~ <>:'"
(I) 0 I-m
,5~~~~
tn ii: zZ18
t: ::Jm~-
III U)?i~1;j
'3;ZlL
_>.. U)Ieg
:t: a: (:JI_
(I) l::J~~;Z
- ;;:--,gj16
C'IJ 5;:~~
:5 @filzJ[
r::J
~
C')
z
o
~
C
c
<(
~
II:
<(
Do
I-
:J
Z
....I
W
N
<(
:I:
z
,
#i
I
,0::
"W
~>
'0
;0
b
i
iU ~i
j:H-!1
~::~~!H'
~~ihd
.
.
li
z
!
I.
11
.
~~
o
!n
Iii
i'j
Uti
I
-------1
I
I
I
I
I
I
I
I
-~-----I
I
I
I
I
I
I
I
I
I
______,.J
I
FESa,l
1NV~9(l71
ZIUlrPVC:
=
N$J..c::m I
F&13" ov IINDBOX
JOU'Wll.Cl'
EXlSlWG MH
0"
TC=901.9lIJ
N,sINV-905.Jf
I
1~U'I:;-WC
SPLITTERJ12
N.SE.s=~1
I
IlLF1Z"RCl'
l'ESS2
INY_90S
5lllFWPVC:
CONTll"'ClURTOREMOVliEXlS'llNG
STORM~~;~~g~~~1
I
l'ES~J
lNV~CUI
I
I
I
I
---
OLOGASLlNEEASEMEl'.'T
r ,- --- ------7-------- -.-.
/ I / -.....
.,/' I I ...............
f "
f "
J::: ,f,-,,,,,-- ~ /1
<. / '",,-- 1
-' I ~ /
/ ""--, /
I' ',- ,:..."^,,,,,I-' /
........ S"D.I.l'vn/-
, '",,--
'",,-- / f
')(. /e,
/ ' /';-7/
, 'I ,V
1
------
/
3
~
/ '......,
EXlSTlN(JM~,
=~~::~~~
E.XJS!lNGHYDRANT "
,
, L>,. :i
CB#I/'-....~ /1
TC-<J&17 -............ I
NE!tN-912.14 ...'-.......V /
''-,/
,I
/
"/
/
/
'I'
2. LOTS 1 & 2 BLOCK ONE AND LOTS 1,2,3,4
BLOCK TWO HAVE EXISING SEWER SERVIC
CONTRACTOR TO VERIFY DEPTH BY
EXCAVATING AT STAKE MARKING END.
NOTE:
L LOWEST LEVEL OF ANY FLOOR
IS 905.1 PERRlCE CREEK WATERSHED.
2
,
f
~ / /
f~ i
/ 'I---..
f "
f , ""--
/ '",,--
""--
'",,--
i
2
1O'l'."'SF.MENT_BDTIlSTDES
OFPROI'ERTYLINE
,
,
-',
I '
1 \
SIORMMHfil \
~,
NWLNV-~.54
WINV-oo:i.64
DL\._71"
SPUTTEJl.NI
TC-9ll7.5
WALL,OP-907.5
\ ~;)~::;~~.
\STNV""IO!i.l4
'nlA_7S"
EXlSTlNGHYDRANT
1
1
1
1
1
1
1
1
1
1
1--,
/'-............:.............
1 "
1
1
1
1
1
1
1
1
1
1
1
1
1
1
"
1 "
1 "
1 '
~
I
" " "'" '"
---
1_.
SCAlE 1" '" 50'
fASEMI,NTAREA
I
,
r
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
I
,
~--------,--
BASalAPANllCONTOl.lRS
PROVIOEO!IY:
,-~
S....daI..anr::lSUMoyiog.J.U:
~114
~ ~~"~
i!,I'
E~H~
-~ ~~~~~
~~~~hi
~~H~~
~hH~
~
~ !
} !
CJ~ 3:
zU~:)
_QS::~
Z3~~O
ErUi~
~I"~
, ,
I:' !
:U ~
ni ~
~~~
'l' i~
iii !!
. i
z
0 ,
.
~ ,
,
~ i
z
0
" ~
"
0
< ,
.. m
oS ffi
z .
C).S! ....
.~ ~ ~~
a: ~ ~z
c: 0 gt3
.~ ~ ~ ~~
c: lr<ll:!:-
IU ~~~~
.~~~2g
'i ffi xa'ii
- ~ 9 ~g
ca ~~~~
:s LU~Z!e.
p:J
<J
(')
Z
0
i=
C z
C ,
<( ~
""-
~ ,<(
a: ~:;;
<( 'w
*f-
D.. ~(j)
I- 0
::l ~
Z .
...J
W
N
<(
:I:
ill ~~
F~ii~:
~nIU~
.
.
"
o
z
k
u
~ ~
~ IIj
<
~ C\I III
w 1'1
~ il'l
"
'"
.
,
,
,
,
,
,
,
,
______,-.J
,
I'ES#II
mv~9011
21UI2'PVC:
CB~
N.s~C::-~1
F&(S'OVA.'lDBOX
3~LFI5.RCI'
~O~
,~
TC-907.981
li..'llNy..<)(Jj-l[
I
1~ LF 15" rve
SPI.lTIEIUI2
N.SE.s~~~1
,
II LFIZ"RCl'
>~n
1NV~'.>1l1
53LFWPVC1
CONmACTOIl.TOREMOVEEXIST1NG
STORM~~~,~~:o~g;::;Z~ I
,
="
~-,
Ii, ///
j
j-+--~----:;>'"----V-<-" /
I I /t/~:-;>/'f ",
, ,[' ",/ ,/
I~ y'V..I!:':'STINGHYDRANT
V .bt',(' 7~" 6
/j L TC-910./iI
... S.1NV""XlJ.14
, I , -----
l_______
1
I
I
I
I
~
I '-',
EXISTlNGMfr,
~=~~;J~~
I!XISTLNG8'fDR.AtlT '-'-,-
'"
),.f~ - /
CB#ltil7'~ I
~IMv~12.74............ . I
~~""'J1LM ................v /
r "/
/
,
/
'-;'
,I
/
'-;'
EXlS1INGHYDRANT
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
I
/
/
/
/
/
/
/
/
/
/
/
/
/
/
J-,
/ ,
/ "
/ I -
/ \
I STORMMHIt:l. \
~.,
NWlNV""J05.64
WINV~OS.64
DlA.n-
'"
''',
2
IJSU2,"RCl'@l.3%
.....--.. ........
930
.. 1
1
I
I .........1... ... ..........
.....1 ........
I... . ..1.. ...
I.
I
I
II.. ., .... ....1.--
...
...... .......... .....1..........
.... ..1
... .i&i's-av---n .. +.___ __m'_
Al'lO-aOlc........ m...mu.....m.....~.
925
1..1..+..+
.:':~5*....R:--::.::::::::,.,t---- ._........':::::.................._....1"",::---.
m__ _-....m......uDiA:4S.
.
.
I ............=cc=,....... ....
I-------..~~=:~.. ....
1...",...--..".---- -n--...-...m.."..._.._mre-907;9!l-__._..... -. .--- ',._,--,
920 1---00- ~-~=j~-,.--- - - ".. -.--
....(:).- .... '~r-n..........'o'..
,;,..:<;~
'n--:':':I:--:-::--!- - ,lFli:: "'s~~~~1-'
-----00 -5IH_'.-(14 ~=:~
... ,,-- '- -- - -~Ykr::!"~'E~4" DlA. _48~.
1~~~~f""~:="o ... ......~;-
t-7 =-~~~'-ro';.ru-'- -.-"", _____ ..."..... ~-
7' ~~~ ~,;./,/ ~,_:;>- _. ....
:;;Z; ~~:~':~=~~77 ...::~- _::
/::'~"=;~~~~P"~J~~
...Z;:........:~~~~...... ~=""'wM=J..... :.-
" .... ,00,;""Jl..!:....:.' ...
,;"'....'"..............1.. .....
_.~~8 !",C_@l.~~. ,:~...<s---.J
... ..
.'1... ......., ..I...k\.... ...
....... I. I ....
......... I. .... ........ rn. .... ...... .......
-", ",.."".. -,--- 'STAlliH.r.'-~ "\.....- -,.-- -0000-
.
.
:0.<
..
915
................- ....."Cll!!-l'\............\
_sr~=...... ,..00.........
1i"1NV"'90S':;- .
"S-~~:8-:"'- ----
...... ..................... ......\
-
"'S'l'AI8"",O;OO'
__..n...T.Q:1I.1~,:!:\.
EINV-902.6\
WRN-902;6Il
.
'''ll.E.rn.~:m. :~- ~- -...~ ......, ......,..... .....
......:..[llA_.-,._.................'___n_ n....
:FT2"Rcp@"1w-:::;,-n -"." ...." ,
.......,.. .........
;:,\~~1~;
\"
'./
ST^j:j:~\",
,l;~ ~~,H __/\
~:~~~~ y:. :~~'..._..
j
-...\
- ...
:=,
~
910...
....=g~. r-; . .--
....... r ."". I.
I........... ......f<~.c/
. .
1/
.1....
..I/:~ttTh~I....
_in:.~.
... ...... ... ..' ",. ... 1 ...
.... ... ........',-; .. =~ -"
.."... ..- ....................... -- :-:::--~... .......--.. ........58~:~5;:~=,-'2y.:X.
.
905
900
..................... .......- ...
__d. ____EXlSTlNl 11~,D./.l'_WM_ 00__ _"_....,,,...
................::: ...I~
lrou'rrvC'@A'lI
:7 .....
.r-D WM.
...,...
1
I
.............'..7
I.;,; ~:::F :. .....
-...\ ..
i~~ :p.v~~;~~_~' __
..... ...
895
TIE!1NTO"SllNGWi>l_V,-.-.----
:__--"TA"pIl"Rl1Q-oli BYCl1Y--n ... -----
........... ...
I
,
.
.
,
,
..
1 ,~~c;;
a)ocO
OmO
m m
o~
.~
~ .
om
mO
m
r--:85
~cci
mO
m
.r::: IT!ro I<:! ~ oqr::: r:q~ ~Si
~g~g~;S!~*~*~
0} Q) 0) en m Q)
oq~
~.q:
m~
m
.~r--:g] O"!:g-r-:
~:!~:j~~o;
m m m
~~~
.~ .
m .~
o~o
m~ m
m
~~~~~;:;~~
oNoC\loNoN
0),",""0)"-0>"-0)..-
m 0) m m
Ol:~ cq
;:<:"i
0)..-0;
m
C\!g"dG'<d~G:!~r--:~'<l:
~ .~ .~ 'M .~ .~
,--,'<r..-v,-v...l!)~<D,-
O>'-O)"-O)"-O}__O)__O)
mO)O) m 0)
~~~
O:C!d
~~~
m~ m
m
~" ~
~co ro
0>...0;
m
00
.0
o .
NO
mN
m
21+00
20+50
20+00
19+50
19+00
18+50
18+00
17+50
17+{)0
16+50
16+00
15+50
15+00
14+50
14+{)0
13+50
13+{)0
930
925
920
915
910
905
900
895
50 a 50
---
I _ I
SCALE 1'= 50'
MINlJv[lJM LOWEST
ELEVATIONS FOR
GRAVITY SEWER
LOT BLOCK ELEVATION
910.00
2
4
7
2
4
5
6
7
9
2
908.00
905.20
905.50
906.00
906.00
906.00
911.00
908.00
907.50
906.00
905.20
905.20
905.50
2
2
2
2
2
2 905.50
2
906.00
""
BA5EMAPANOCONlOURS
PllOVI:lEDBY;
-,~
Sundo.landSllI'rOying.Ll.C
962-8ll&a114
l '~E"'!
., .
~hli
~ ; ~ ~ ~
~ 3' '" 1: '"
..~~H
~U~~
~~8H
~
~ ~
, .,
li~'~! i"
~~~~~~
liol'!
=~~ ~~
;;~~ ~8
~ig~~~
m,,!!
~~~I~~~
....:..." ~-..:.
'c~ ~
Z!H'
Z~U~
1r!3~~
~r~.c~
'"
. i
z
0 .
0;
~ ,
~ i
z
0
> ,
;;
0
. ,
. .
.. "
c: w
- ~ JD
'" j "
CD.. dJ
'i: ~~
: ~ ~ib
C ~ g&l
,_ ws:w~
CJ 1::;~!ii
.s ~>-~i
- .~z"-
~lI):q~g
a:ClJ:~
CU w5:Cl'9
- ~g~~
CIS g~~~
:: ll.dilz~
~
C")
Z
o
l-
e
e
<(
x:
a:
<(
a.
I-
::l
Z
....I
W
N
<(
:I:
z
~~
, 0
~c::
~u
, c
. OJ
~ C
o OJ
~c:
.
~H ~i
!~~ih
~j~IH~
ll~a~~~~.
I
if
,>
~ .n
z
I I
. In
a
iL C') m
~ rl
c i~d
.
~
I
I
---,1
I
I
I
I
I 21
I
I
I
I
1
I
I
I
I
I
I
1
, ..
'~ :::::=-'-....-----------
~ . -.::-_~ /
...~,- /
-;:;
~
1
'/
~,
/ ~
I
/
I
/
/
/
/
/
/
/'
,
,
"'I
ffi
>
61'
:;;
...,
'"
>
""
.... ....... ... ...... .......... ..... ...... I. ..... ..... ..... I .... .... ........ .. .... I.. .... I.. ......
.... ....... I ...... ... I ...... I. ...... ..... +.. ...... .......... ... .... ......... .... .... .. :. I . I. ........
... I..... .......... .. I .... U "'1' ... ...... "'u + .... ..... .... .... I....... ... I.. I... .....
930 . iGH poiNT -LEv = 914.3 . . . 930
. "~~..s.~ ,_. ci :-.1!QINTEL ~'. 912..70__ PVI ELEV 914.50
. I /=19+00--- 1 I POINT 5T = 16+54.78 AD. 2.61--
915.00' "PVISTA.:o: -1-f;i-56 _H K.=, 8.72..
... ..... ............... I. ........ ... I K~ -5.:38'" PVIHEV" '~m~.45
925 ... ......... .............. I.. ........ I.... I,,, .. I..... 8-.4,5... "'AD. .0'4 ....... ..... ....... ........ I.. 925
I PVI .REV 908.50 l(jo've . ....: 50.0000' e ...
A.D. pl~g6 ,~ ,
.. I' I. ~153.0 ...... I , '" ~ ,..
K .27 :z~:~
...... ..... ...-----.. g . ..~. ....... 100.00 . 0'VC- . ..... ............... I. ......
920 I. ..... .. 1 .... I... ...... 0< <0 .............. .... +.. ;; .......... ..... 'u 920
N ~ ~
I - ,uU.U' UU "J ~% .i " ~ m . it .~ . '" - m 0 0 ~I--r
ill ~ en OJ > 55
I . 8 " on !;! a; 0 0 m.
0 on w on w > >
I ..... ..... .... .... ... ....g iJ{.~ '.~.'.. ............. ... ......... > m '0 0 0 -0-- ~ ..w.o ....... ... .......
915 u ........ ....... .... ....~.. ..~ .... .......... ,m >. -[t.. > .>.. ..... ...... ...... ......&--.. 7/..... ..... ....... 915
, ~ m m -
.......... .. ... ....l 00 w ....../ .1.05%... ,00%. .. .... .......
0>--> --..-.. , ^ ...........
w m ~ " ^/
'" w ~ - ~
0 " '-.- . a . .
910 . ~ "' .. j , '-~ e---~ 910
/ '':''
:.0'.38 ....... '<" I. ...... ...... I.. ...... ...... ..... .... .... ...
.. ...... ........ ......... ...... .. ...... .,~ '___c... ...... I.... ...... I'u,,,
....... ...... ..:. .............. ..... ... .. I.. .... .... ......... 905
905 I . . .
. ... . . .
..... ..... I.. .... .... ... ..... ...... ........ ....
..... ...... .... ..... .... .... ... ... I" ., ...... ....... ...
900 ...... .... 'u .... I.. .......... .... I ....... ......... 900
. ...
I.
895 -........... ............... ... .-......... ............ ...... 895
~wo C;;q fEr-: ~ r:::~ ~"1 ~~ r::<"! ~~ Si~ ~ ~~ ~O"! :55----: v~~ qO;<,,! g2q r:::<"! o~ -m 0"!f.6"! ~g",: ~v ~m ~"': ~"': lC!~lC! 00
1~ gj ~- 0.- <:q-.i .v . w . O. 0. . <0. .0
. ~ . m . N a)~ d~ . 0 . N M(\j (T')~ ..t~ . N crj;: m . ~ ~ . ~ . ~ . m . 0 '0 o '_ N . N . ~ . ~ . v . ~ ~ . ~ o .
000 Wo 00_ - N NN ~- ~- o~o aNa No No 0.- M_ _M_ -~- ~- ~- ~- W_ _00_ NO
Om Om Om Om - m -m _ m - m - m _ m _ m _ m _ m m_m m _ m _ m _ m _ m_ m m_ m m_ m _ m - m _m _ m m_ m mN
~m ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
c'
-"
'" 21'1{}0 20+50 20+00 19+50 19'1{}0 18+50 18+00 17+50 17'1{}0 16+50 16+00 15+50 15'1{}0 14+50 14'1{}0 13+50 13'1{}0
m
'"
;0
r- ....-
SCALE 1"=50'
'"
100
BASEMA?ANI)CONTOI.IRS
?ROYIDEOSV,
-~
Sunda!.an<l~u.c
~114
.'
j'
'!
"
~:;:
.,
,.
q
~~
;~
!8:
~I
g
,
~
h 'I
qj
r "'"
,,~ ,;
zl~:g:5
_oj:::>
zg~~~
a:!~ ~~
~5~..:l
:ll'"
~~
~,. " ~
ili!!i
!1~"!i"
~~z ~~
i:~g ~g
"ill,
~~"'];;ll'S
ll'''l!'
liilll"
';0
u ~
.s ~ <C
.,,:l ,
c a.. <\0
'i: . ~~
~ g! ~:6
c g grn
"_ W3w-
en ~~~lB
.5 ~ ~ ~~
'3Zu..
~(I)a8g
CD llis:~~
_ zg~rn
('Q; a03-
~ ffi!'c!~~
r::g
<::::J
M
Z
o
!::
c ~C\1
C ~'2
<( s:t;:::
~ ~ 2
a:: ~ a...
, '0
<( ~ C
a.. ~ tU
..... ~ ~
:J ~ 0:::
Z
-I
W
N
<(
J:
ill z~
n~H~.
"',,1'1,
~.~-;j .
.
.
"
o
z
I
Ij
I.
I' .
.l'
,u
..~ In
~'5 ~ Iii
~~ n
2"
.ll
I
I
I
I
~---~
I
I
I
I
I
-----I
I
I
I
I
I
I
----r
I
I
I
I
I
I "
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
----~
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
r-__
I
I
I
I
I
I
"-
y ,
/1' <If' ........
;// "~~",,........,
,,-/'\( // ff"'t.,.......,,
;; \\~ <? /))! r{;:~?#,
,'I ,,,,\,~~ ,',J1///<?,fr
I, l7!f!-"-'-/ I j '-I' ""
111/ ", -...-,.. /-'":;:..' " /1/ /,/' /i7 #' /
, if! :' , ,. '-..1 _' . f ...-"'-" 1:>/
. f. "- '[ I ...- fl!'1.
~' ,I I ' 1
'1'-
1---
..,.---
,_r_-
/'/r--
/>/<---
r ,r I:;~'~'>
; /: !
1\ \'
I
/', .
'II
100EASEMENT_BOTHSlDES
OHROPERTYLlNE
I
I
,
I
I
,
I
,
I
,
I
,
I
,
I
:/ /
.....,-;
'I:
!I::
[.'
,
1',
I
\
,
Ii:
II'
ill
1~1
PIl,Ol'OSlillEASEMENT
"
/;
'" ,
- - -
1-
'"
SCALE1"",5l)'
''''
''''
5ASElMPANOCONTllORS
PROVIDallJ'f;
FlaIlklalz
SUnde.L.andSUrwyi1g,~
952..aa&3114
~~~g~
. 1'''
!.!U~
<< ....,. ~'"
EnH~
"e."
g~ffiH~
~ ~~q~
::: ~o~w!o
,
~ !
'1 ~
j ~
~~ 11 ~
~~;~~g
;gdi'i:;
~!Hn
i~81l~~
~~~dg
ii1~~~~~g
'1l~~~~8a
c:l~ ~
zll;'
Z3!~~
a:j~~~
~!,!g
"! "
'-- .J
. ~
z
0 1
"
~
" I I
z
0
" ~ I
"
0
< ,
.; .
= .
- ~ ....
tI) ~ ~
.5 ffi ~
.... c ;ng
~ ~ ~N
CD 0:: """.c
c: 0 @f6
'u, ~~~~
C a:<o~e
1&1 ~~:;-,f
.>. . ~~'"
~ :Q~j:~
CD WI(!J'9
_ ~9ffi~
m GOS:~
:e ~H!~i[
r:J
<::::::J
(')
z
o
i=
C
C
<C
~
a:
<C
a.
I-
::>
z
...J
W
N
<C
J:
z
'Z
i::i
0(L
~(9
~z
i!5
~<{
0",
~0
.
.1I~ ~
;p ~!
~.I)ii -.~
~;~~~l
~~H!U]
~ II i
, ~i J
~ Irt
~z LO III
~~ r)
(:J llH
51
z,
~I /)pi
<c,
@I 1
:s' ,
~I fi f i I
"', ,
I 01 //l 1
I .' ,
I , '-::' I
I I Ii:
I i
I ;;, ,
I 1 ;" 1
,,!
I I"
I , j.; ,
I I ;'!i I
I ",
I /-/;i ,
I 1
______,J ,
I I \! I
I
I :j ,
I I
I ./'
I --
,
I 1
I
I ,
I I
I ,
I -
I
I
I
I r
I
I
I ,
I 1
I
I I
I
I
I I
I
I
I I
I
I if
I ., / - /
I
I
I
I
I
_______J
I
I
I
I
I
I
I
I
I
-------"l
I
I
I
I
I
SILT fENCE I
8AUCHECl':S
______,--.1
I
I
I
I
I
I
r-__
I ---
I
I ---
I
I
I
I
I
I
ThI~~~~11r
F&;IFlBEflERQSrONCONTRoLBUNKETSONSlOPES
r'-------
/ I
/ I
- I
I
21
100EtlSEMENT.IlOTHSIDES
OFPROPERTYLlNE
., i\
'./ \
1;\\
\
\
F&TWOODfTBEREROsIONCON11l.0LMAT
ATEMERGENCYOVERFLOW
/-;/::/
iJ'
,,/,,~/
-" 1-
-" -
,/' /~I
/1
i/
~----;'/...''''''
I -_
,~~~7::- --
NOTE:
1. SEE INFILTRATION BASlN DETAILS FOR CONSJRUCTION
SEQUENCING.
2. lNSTALL CONTROL.MEASURES WHERE APPLICABLE
PRlOR TO EARTHWORK-
3. ALL WORK TO CONFORM WITH RlCE CREEK WATERSHED
RULES AND REGULATIONS.
BORING NO. # 1 MEI
ELEVATION 902.00
BORING NO. # 4 MEI
ELEVATION 900.00
" 01 ~
" "
.! !,
" " ~
~; ~..
" ., ~ .~
~a H
8~
~!;; n ~
~~ ~:li l
1.0 --L Topsoil- Dark Brown Sandy
I Oar\( Brown Sand w!SlJt
~:g Dark Brown Silly Oay
Brown Sand Rne to Med Grained
6.0 GreySandw/Mottles
80 Grey Sand w/Silt
8:5=:1::= Wet-E.O.B.(8.si
1 0 + Topsoil - Dark BrownjBlack SUly Sand
"' I Dark Brown! Black Sandy W/SIII
Brown Sand Fine to Mad Gramed
Wet-EOS (75i
75 I
Og ?;
Zll!'
i5~~~
a:ll"8~
..." .,:J
;:g~ ,:.fil
..~ 0:
15"" Ci ~
Ie", ,
~!;;o~~
~",,,~~
~In~!
S"i5~~~
~n~n
~::;~~:~'"
!l:;""SI'.~
!lIl'fui!l;=a~
'- "~"':'-
BORING NO. # 2 MEI
ELEVATION 904.00
BORING NO. # 5 MEI
ELEVATION 902.50
. i
z
0 !
0;
~ .
. !
z
0
~ ;
"
0
" , I
.. 00
C ~
_ W ,
Z .
~ ~ ~o
'Ii:: ~ '" 0
GJ 17l ~<ii
~:s gi2
'0, ~~~~
C a::""~-
Iq ~?t:;;:-,f
~ ~*~g
CI) ttJI ~ ~
_ z9ffila
ca a03:~
==ffi~~~
r:g
<::::J
2
C') :'5
z "-
0 CJ
i= 2
0 a:
zO
C ~m
<l: ~O
::.:: .2
eo<(
II: "..J
<l: ~O
a. . a::
~ 5r-
"2
:::l ~O
Z 0
....I 2
W 0
N W
<l: 0
J: a::
w
iH ~!
l~H-!'i
~Jl~Uf..
~H",~H
i
..
~ I!
b .l~
Z
~~'~'~,",_cr ~; ~ j
1.0 Topsail - Dark Brown Sandy
Brown Sand Fine to Mad Grained
4.0 Wet-E.O.B.(4'}
1.0 Topsoil-Oark8rown/BlackSandy
2.5 Brown Sand Rne to Mad Grained
Brown Sand wIRed Mottles
11.0
12.0T
lS.0T
Brown Clay wfTrace of Sand
Brown Sand Rne to Mad Grained
Wet-E.O.B.(131
BORING NO. # 3 MEI
ELEVATION 904.00
BORING NO. # 6 MEI
ELEVATION 904.00
1.0
Topsoil-DarkBrown/BlackSandy
Brown Sand Fine to Med Grained
Wet-E.O.B.(4'}
1.0
4.0
6.0
Topsoil- Dark BrowolBlack Sand
Brown Sand w{SiIl
Brown Sand Fineto Med Grained
Brown Sand Fme to Med Grained
w!Motl!es and Trace of Silt
4.0
16.0
Dark BroWl1 Sand Coarse to Med
18.01 Wet-E.O.8.(181
~ ~ '"
---
I__
SCALE l' =" sa
'w
BASEMAPnlDCONTOURS
PROVIDED6Y:
-~
Sund&l..:ind~,W:;
~114
z ld
,.,
Qz <0 lil
00:) 1'1
iiea ~;j
w
Sanitary Sewer Details
GRllDElEVEL
SElECTMATEfUALFREEFROM
ROCKS,LARGELUMPSOF
EAATH,DEBFlIS,ETC_.
<
w
,~
o;~
,
112 DlAOFpjPE
THOROLJGHLYGOMPACTEDBACKFILL
LJNDER PIPE HAUNCHES
WA1ERLINE
/14 GAUGE TRACER WIRE
VAflIESWlTHSOll
I
~,~~""
NOTE:
If WATER LINE PASSES CLOSER THAN 18' ABove
SEWEA LINE, SEWER LINE MUST BE W_M. MATERIAlS
10 FT. ON EACH SIDE OF WATER LINE. (SEEMN
HEALTH DEPARTMENT WATER SUPPLY STANDAFlD
CHAPTER1::!.)
Pipe Bedding for PVC
Sewer & Water Crossing
NONNENTEO SElF SEAUNG MANHOLE LID AND
FRAMEwm-I CONe&.LED PICK HOLES & D-flING
GASKET..... UDLETTERING."SANITARYSEWER"\
NEENAH FOUNDAYR.l733 (non-venteO}OREQlJAL==-.. \
PLASTIC COATED STEPS IN ACCORDANCl::
WlTHASTMC-478.MNODTPLATE41ll[!QR
ALUMINUM M.H. STEPS TO BE lNSTAUED
SPACED 1S'O.C. LOCATED OVER
DOWNSTREAM lrwERT
,,~
,'~
U.N.<l.
A
AlUMINUMM.H.ST!::PSSPACEO
16'O.C.AUGNwICOVER
RUSBER BOOTWITH STAlNLESSSlEa
HOSEa.AMPTOMAl(E~~~_____..
DIECASTINVERTIN PI.ACE, SMOOTH
TROWEUED SURFACE. SLOPE ltt IN 12'
Horizontal Section 0-
GROUT BOTIOM TO SLOPE TOWARD PIPE
AS SHOWN BY ARIlOWS
Typical Manhole
4'MINSTEEL FENCE POST(U,T,Y
O"CHANNEL)M1Nl.3:lLalFf~
2>2 MIN SIZE WOOD POST1NSTALLEDVERllCALLY
TO ENDOFSEllV1CI:, FLUSH 1'I1TI-l GROUND,
14GAUGETRACrnWlREFROMMAlN
-
P.n<B<fIDlClH
CAP ENDS
LONGRADIUS45'BEND
NOTE:
ClEANOUT NEAR HOME WITH EXTENSION OF
TRACING WIRE IS RECOMMENDED
Sanitary Sewer Service
t
SANITARY SEWER MAIN
Wye
2'_0'
'r
2'_0'
(IF REQUIRED)
Pipe Insulation
,~,
, ,
'Q
MINCOVER
VARIES
WATERUNE\ ~14GAUGE'ffiACERI'I1RE
+
1(JM1NIMUM~
~SEW8lUNE
NOTE:
10' OUTTO OllTCLEARANCE REQUIRED
BETWEEN MANHOLES AND WATERMAlN ALSO
Sewer & Water Crossing
~I
l' ~,,! \
mn~;
~~U5
ei~H~
.0<_ "
:;:Z,.:;;,\!ji; ~
~ affi~H }'
~ ~h~':1
.::: ~d5 ~ffiI.
~
1l" :ii ~
n;1 ~
!~U :;
~~n ~
iU~ i
~~H ~1i
~~~~ ~~
~
,
,,~ 3:
ZII!'
z31~~
a:i3 ~~
~I"o
i ~~~
.
z
o
0;
~
.
z
o
"
5
o
<
u ~
c w
- ~ ....
I:J):S ~
'E 0. ~~
~ ~ ~~
c ~ gf6
..... l1.fs;wc;::-
O'J fr:z~:g
.5 ~~~~
. 3:Z":.
:E" cna~m
Cl) lliI~~
_ z=Ua16
IV ao:;:c;::-
:5 ~~~.\ll
p:g
<:::J
M
Z
0 en
E -'
<i'
CI ,r-
CI ,w
,,0
<( ~a:
~ 'w
c: ~$
<( ~w
~U)
a. ~>-
l- Oa:
:J ~<(
Z we
..J Z
<{
W en
N
<(
J:
iU ~!
~ Jl~'.<
b.h~
~H!if~
I
!
~ .ij
z
~
~ ~ f'..
~.
~~
"
.
w
ht
~h
~'l
'I'
;,t
in.
.~
SLOPE
'I\."perlool
l
SURMOUNTABLE CURB
"
..
'^~
F~
'...J
,,--.J
.!
~
.
,.
8618 CURB
Concrete Curb & Gutter
~'
"
=- ,~
~1~.'
,
2.00'
""
,,~
2" Z350 LVWE45Q 30 8 WEAFlCOAASE
= TACIt COAT
2"2350 lVNW3S030 B BASE COARS<:
6'ClASS5GRAVELBASE
.'
~
,,'
~'
,~
~3
,~
,
a"TOPSOIL
(TYP.BOTHSIDES)
$URMOUNTAELECONCRETE
ClJRBANDGUTTER
Typical Street Cross-Section
"
,.
~a
},"",,,."-,,,,,,,,,
I
eo'
NOrr: 'OlAMEJERTOVMNflSOtiElIFOR1NSCH(QU!.E
:.1',....
"
4'-Q'
UNLESS Oll1ERw1SEIlOlID
+
I
IoWHIlE FIWlE .I< CO\IOl NEI!iA/l ~-J200-A
!)RftPPH(IVE[lEDlJ.IL(V~SC_\iE""ffi))
SU C>\TCH IlASlN f'IlAWE ""0 I<lJUSJIfG RINGS IN
rull.El6l0FGROUT.
2" CONCIlErE AWUSJlNG RINGS (2 ~IN. ~ MAxJ
....U~MJII !.I,ll. STEPS 1"0 BE
INSfM..llil Sl'ACUl 16"o.C.
PRECAST RCNFORCEDCONOlE1E
l'lf't: SEcnClNS (ClASS ~)
GROOTUl ~.H. JOWTS REOORrn.
_NEJ(ORO_RINCCASI(OS~to;or.l~orn
INViEfMlo,sTO l.lFDINAlJIlAIION
spoonClTlOllS.
!HIS NQ. ""'Y B<: Bloc;~ !)R!'RI;OSr
(To TOP Of PIPE)
CASfllMJlTIHPlACE,SMQ(l11<TR!lWrufD
~Jcr.Sl.OF'El/2-1N1Z".
65-0l<.RBNRl=COIICllEIE
Wlllj6'610/10~
Slab Top Catch Basin Manhole
"
OEFRESSCASTl>lGo.l"
saOWFLO'M.lNE
Street & Storm Details
TOI'OFCUIl!l
PLAN
Curb Transition At Catch Basin
ISOMETRIC
A
A
~~~""'''"
Z'"S"STYI..EC&G
4"TRAr4SmON
TOPOFVSTYLEC&G&
SUR'-IOUNTABlECURB I
"B"STVLEC&G
SURMOUNTABLECONCFlETECURB
C.B.CASTING
I"~
-j-!.
=fT
I
Curb Transition at Intersection
,
TAANSmON
MANHOLE FRAME & COliER NEENAH R-2.'.i78G
w/TYPECGAAll.:OAAPPROVEOEOUAL.
(UNLESS OTHERIN'ISE NOTED)
S8"CATGH BASIN FRAMEANDAOJUSTlNG
RINGSINFULL8EOOFGROUT.
"
Z'CONCRETEADJUSTING RINGS (2 MIN,4 MAX)
AlUMlNUMM.H.S1EPSTOBE
INSTALLEO SPACED 16'O.C.
.,
,
I
.. .~.:~~=:<.';",
r
6'0 REINFORCED CONCl'lETE
8ASE~S><61ot10M5SH
PRECASTREINFOFtCEOCONCRETE
PIPESECTlONS(ClASSI~
GROUTEO M.H. JOINTS REQUIRED,
RAMNEKORO-f\INGGASKErS
RECOMMENDED IN WUAREASTO
MEETINFllTRATION SPEORCATTONS.
THISARE!\MAY6E6LOCKOA
P!IECAST (TOTOP OF PIPE)
CAST INVERT IN PLACE, SMOOTH TROWEl.ED
SURFACE.SLOPE1/Z'INl2".
Catch Basin Manhole
1RtANGUlARVAl.L~
,-
SAWCUTEXlSTlNGC&GATENDOFRAOIUS
MATa-1 NEWC>OEXlSTTNG
w'''~''''"'''''~"~
STREEr\
~ .'" ~
LGJ
SECTION A-A
GU'TTi;RSEC110NCl TOMA],"
EXISTING FLOW UNE GRACE
CONCAETEVALlEYGUTTER
EXPANSION JOINT
=
Concrete Valley Gutter
f~:f"~1 i
I I E" .~-
BICYCLE SAFE GRATE [TYPE C)
R-2578-C Curb Inlet Frame, Flat Grate
'"
~ ~~"'0 " ~
'"
~ lr,;,:;,., 114" I
r-
I
~ ,,~
I
,. I I
~, ,.. 0
~'''' ~'''' ~
0
~
R-3250-A Curb Inlet Frame, Grate, Curb Box
,r
AlTERNATE DESIGN
rT PLAN VIEW
+ ~
D'
,------j
NOTES:
1. HOLES ARE CAST IN SECTION AS
REQUIRED FOA lYING FLARED END SECTION
TO ADJACENT STRAIGKr SECTION.
2. END SECTION IS MANUFACTURED IN
ACCORDANCEWfTH APPUCABLE PORTIONS
OF ASTM SPEC1ACATION C-76.
T
~
~
IA
.'1]
oj
A 8 C E F
G
I
,r
LONGITUDINAL SECTlON
GRoOVEENOQNOUl1..EfENo
SECTTON TONGUE END ON
INlET END SECTION
D1A- W~RHT SLOPE
METER ECTIO
INCHES lBS. XTOY
12 S30 2..4:1
15 740 2.4:1
18 900 2.3:1
21 1200 2.4:1
24 1520 2.5:1
27 1930 2.5:1
30 2100 2.5:1
36 4100 2.5:1
42 5360 2.5:1
48 65S() 2.5:1
54 824ll 2.0:1
60 8730 1.s:1
66 10,710 1.7:1
72 12,520 l.a:l
78 14,770 1.6:1
84 16,160 1.6:1
90 20,900 1.5:1
" S7-1{2 IN NOR.TH DAKOTA
o
INCHES INCHES INCHES INCHES INCHES INCHES
, , " *,. 72.718 "
2_114 , V " '" ~
2.1{2 , V " '" M
~. , M 37-1{2 ~'" "
, 0,. *'" w -n.112 "
3-114 10-1/2 49-1/2 " ~,. ~
,," " ~ ,.". =, ro
, " ~ "'"" w"", n
"" " ~ ~ ~ '"
, " n ~ ~ ~
;0" V ~ 03-1f4 98-1/4 00
, ~ 00 "' 00 ~
". ~ " v 00 '"'
, ~ '" " ~ ,~
". M " " m '"
. M .90-112 " 111-\/2 '"
". " 97_1{2 " 111.1{2 ,~
INCHES
,
2-114
2_1/2
2-314
,
3_114
3-1/2
,
".
,
5.1/2
,
5-112-
,
".
".
.,"
Flared End Section for RCP Culvert
COTIERPINAND4"OX~'WASHER
(BOTH SlOES)
3!8'"PLATE
lV..GALVANIZED80LT&
NUTAND4"OXWWASHER
IV." BAA
,.~
""M
TIE RODS 2 EACH LAST FOUR samONS
NOTE:lASTFOURSECTTONSTOBETIEDBACK
USESTRIJCTURALSTEELSPEC.330B
GALVANlZEO. WEI..D 6/8'BAASTO 1" BARS 6' D.C.
WEI..D1"BAAST03IIf'PLATE.ORILLTHREE1-&1S'
HOLESINAPRDNFORATTACHINGGAAll.:.
Trash Guard for RCP Flared End Section
SECTION A-A
CLASS2RIPRAPREQUIRBlENTS
12"1024" 4<:ubicyatds
27"1033" 8 <:ubJcjtatds
36"1048" 12cub'cyards
54.""dUp IScub'cyatds
(O""oobk:yardisappro>:Umtdy2,800bs.)
NOTE: RLTER BLANKET REQUIRED
UNOERRIPAAPOR2LAYERSOF
500XM1RAF1FABAICOAEQUAL
I
~"
-. ,',..//
,.. -;, '.-~'"'...- -~. "..,."..~.,..;-."..' '
- __x_'.'
SECTION B-B
PLAN
Rip Rap at R.C.P. Flared End Section
., , ~
j",!
~!Ui ,
g ~~~~~ -
!;:<,"'~d ~ II
mm } l
e~. S" I:;i!!~ g
Z~~:l:l i~~~~~
_o~;:>- ~~n~~
Z~~M~ ~~5~iil~
a:~18~ 'II'!;
~C:P .,::>
3~~ -'~ ~~<>E!!la
~~~:::~i'i
,,~~~s~
'-----'
.
z
o
0;
~
~
z
o
~
il
.
c.i ~
.s ~ ...
C1:5 ~
I: P. '"
";: ~~
Q) ~ <(<'<
CIl 0 o"~
I: >- <1.>'"
._ W5:lLI-
C1 ii: 2; z~
c: :J"'~-
LLI ,,?~~,f
~(I)a2g
Q) llix~~
_ ;z:ggs:ljl
ca a05:~
=s ffi*~~
P:3
<::J
(')
Z en
0 -'
I- ~
0 z W
0 > 0
<( ,!ff," ::;
"
~ 00:
110
IX -;:~
<( .
a. ~o
'z
I- ~<(
:J ~f-
Z w
..J w
W 0:
f-
N en
<(
J:
III zi
~.tll.!!
j..,..
s!j>.:i~~.
~;~;:h~
,
!
,
in 11
b h
z
E 111
"
""CO rh
.,g
_0 rl
f10 .~,
" I,ll
PROPERTY lINE
..-TWIN.
CURB$TQPBQX(SEES?ECS)
NOTE,CONTRACTQRTOFURNISHKEY
lYPE "K" COPPER
Curb Stop
NOTE:4.1/'l:'PUMPERCONNECTION
FAGlNGTHESTREET-THREADSTOBE'
APPROVEDINWiU1]NGBYCIlY&ENG.
WATEROUSPACERHYOfIANT(OREQU~
z
~
~
CONCREfE81OCK
CONCR8EOR WOOD
THRUST6lOCK
UNOISruRBEOSOll
2314'TlEROOS
6" HYDRANT lEAO
+ '41
NOTES:
1. HYDRANT IN WATER TASLETO BE PAINTED wl2' BWE VERllCAL
STRIPE AND BR.I'\SS PLATE SECURED TO HYDRANT STATING:
"I-N'DRANT BARRa MUST BE PUMPED DRY AFTER EACH USE".
2. F&J HYDRANT EXTENSIONS AND FITTINGS AS NEEDED
[INCIDENTAL)
3.10' TRAFRCSECTION IS STANDARD; 16, 22, & 281RAFF1C
SECTIONS AREAVAlLABLE. NOZZLE ELEVATION WILL VARY
ACCORDINGLY_
Hydrant
Watermain Details
Watermain Pipe Bedding
LOOPTRACERWlRE
,,~
CASTIRON6OX
(ClOWf.24&l,OREOUAL)
(MU8J..ERH-l03S7,OREQUAl)
TRACERWlRE.14GUAGE\
NOTE: CONTRACTOR TO FURNISH ONE
KEY FOR EVERY 25 VALVES
Gate Valve & Box
TAACERWlRE-146UAGE
NOTE:
ALL BENDS, TEES & PLUGS SHALL BE SECURELY
BRACED AGAINST UNDISTURBED SOIL USING
TIMBERS, CONCRETE BLOCK, POURED CONCRETE,
TIE RODS, OR MEGALUG (OR EQUAL) RETAINERS TO
BE APPROVED BYTHE ENGINEER.
Watermain Thrust Blocks
/
.~
~,:J?JS' ./
/'
l"-2'WA8HEIJ
ROCKAOOAEGATE
Rock Entrance Detail
Binding
wire or
twine
Staked and
entrenched
stfawbale
Figure 8.34-3 Cross section or a property Installed
stra.w bale ( source: Michigan Soli ErosIon
and Sedimentation Control Guidebook, 1975 )
Bale Check
SUPPORTPOsT.....CHORAGE
WrrHlN-StnJSOlL
WmE.MESHREINRl~GEMENT
MEfALORWOOOSTAKE"
GEOTEXllLEFABRlG
"'':ll ..
~ l;i5::il i' ),
..liI~p
!h~~
~~~Hg
~ ~~o,<~1i1
~l:!:>;_H
ffi~U~~
ffi~=>oa<
Ellia'l'iliSi
~
~ ,
r ~
U~_ ~
ZU~:5
Z~~ ~~
a:~~ ~il!:
."1';'
i 6~~
.
.
o
0;
~
~
z
g
a
o
<
NOTE:ATTACH FAI3RIC TOWlRE.MESHA/>V
SUPPORTPOSTSWITllRWGSORWlREl1ES
Silt Fence
reACX OF SIOEWAtX
A
c,) ~
.5 ~ r-.
.... j ,
.5 a. ~o
... :g~
CU ~ <(<)I
~ ~ ~;Z
'" w:;:w-
tI) &: ~~iJl
.5 ~~~i
,s:ZlL
.>-. cn:r:eg
;:: 0: C1:r:~
cu W I('l'?
_ ~9ffi~
CD a03:-
== ifj~~~
p:J
<::]
~=
T_ USE 8lOCK ANO CIMIU lYP€ SSJ/UVff
8AllRIO?W/-I€NCIIR8INlfJlSlOCATWIN
GeNTLY SLOPING SlRu:r SF:CI.IOIr. WHEJ?€
Il'Af&'CANPONOANOAl/.OWSffJ/MOiTTO
SEl'ARA7f:FRO!.IIIIINOFF.
2. BAIIRQ SJ-/IlU AUnW FrJf/ O'I9?FWiV
FR()IJSEY8?€SronM~
J. INSP€CT8ARfIlEflSANO RE/.I()~SWJIJOiT
AFTER !ACHsroRUEVflff. SEJ}fJ.lOiTANO
CIMIU 1.IIIST8€Ra.I:lI'EVFRO!.I11iE:
lRAlUllI WAY luuaw.ral".
@ "'-""""""'"
CAn;JIBASIN
M
Z
0
i= en
C --'
z-
C ~<{
.<il-
<( ~w
~ ,0
c:: 1iz
<( ~~
ll.. m:;;
~a:
l- Ow
:;:) ~f-
~<{
Z 3:
...J
W
N
<(
:I:
J/.r ~ OIWN Gl'i:4v.:!
(2(lmm)
SECTION A - A
ilf ~i
l:~ih
,j;Bf.
!ilga~~,"~~
CURB INLET
SEDIMENT BARRIER
(BLOCK & GRAVEL)
i
.1
~ U
z
Curb Inlet
o
~-"'m
-.
215
.0
3
In
III
i'l
1"1.,
III
Infiltration Basin Details
CONSTRUC!(QNSEQUENClNG:
I. PERFORM CONTiNUOUS INSPECTIONS OF EROSION CON1ll.0L PRACTICES.
2. INSTALLSlLTFENCEALONGlliEPElUMETEROFTHESITETOPRE.VENT
SEDIMENT FROM [EA VlNG THE SI1'E DtIlUNG THE CONSTRUCTION PROCESS
3. AILDOWNGRADlENTPERIMETER SEDIMENT CONTROL BMPS MUSTBE IN
PLACE BEfORE ANY uP GR.ADlENT LAND-DlS11JRBING ACTIVITY BEGINS.
4. REMOVETOPSOlL.fJl:OMTHESITEANDl'LACEINTEMPORA\l.YSTOCKPILL
LOCATION TEMPORARY SEED nre STOCXPlLE.
5. INSTALL UNDERGROUND tmLlTIES (WAlER. SANITARY SEWER.ELECIRIC
AND PHONES) TAKING THE LOCA nON AND FUNC110N OF STORMWATER
BMPS I'NTO CONSIDERATION.
6. SEEDANDMULCHOlSTORBEDAREASONSITE.
7. CONSTRUCT THE ROADS TAKING THE LOCATION AND RJNCflON OF stOR.\l
WA 1ERBMPS INrO CONSIDERATION.
8. PERFOR),{ ALL OTHERSITE IMPROVEMEm'STAJCJNG ll{ELOCAllON AND
FUNCTION OF TIlE STORM WATER BMPS INTO CONSIDERATION.
9. FINAL GRADE TIlE SITE.
10. STABlLIZEUfESl1EBYIMPJ..EMENTJN:GTIlENATWESEEDINGAND
PLANTING PORTION O1'lHE LA..'mSCAPJNG PLAN.
11. 'iNSTALL TIlEER.OS10NCONTROLBlWKET.
n. REMOVE THE SILT FENCE AFTElI. THE SITE IS STABILIZED PER PROJECJ;"
ENGfNEERAPPROYAL.
GENERALNOTES:
1. LNST.'Il..L AIL TEMPORARY EROSION CONTROLMEASUMS (IN ACCORD^,'<CE
WITH MnOOT GENERALcmromoNs 2573) PRIOll. TOTIlE STAll.TOF ANY
CONSTRUCTION OPERA TIONTIIATMA Y CAUSE ANY SEDIMENTATION OR
SILTATIONATTIlESITE.
1. INSTALL SIOR.\1:Dll.AlNlNLET PROTECTlON TO PREYm-7 CLOGGING OF TIlE
STORM SEWERANO SEDIMENT LOADS TO DOWl'.'STREAM STOR-'\! WATER
FACILlTIFS OR WA1EUlODIES.
3. lFT!lS srDRMWA TER BMP IS BEING DESIGNEO TO SERVE AS A TEMPORARY
SEDIMENT BASIN, GRADE THE B"WTO WTTHTNTHR.EE (3) FEET OF FJN'AL GRADE
TO PRarncTTHE UNDEll.L YTNG MATERIAL mOM CLOGGING. ONCeCONSTRUCTJON
IN THE CONTRIBUTING Dll.AlNAGE AREA HAS BEEN COMPLETED AND THE SITE
ISSTABlLlZED, EXCAVATETHEINFTLTRATIONBASINTO FINAL GRADE AND
COMPLETE CONSTIWcnON OF TIlE BMP.
4. GRADING OFniE INFILTRATION BASIN SHALL BE ACCOMPUSHED USING
LOW-fMPACT EARTII_MOVlNG EQUIPMENT TO PRlNENT COMPACTION OF TIlE
UNDERL VlNG SOllS. SMALL TRACKED DOZl>TtS AND BOBCATS WJTR RUNNER
TRACKS ARE RECOMMENDED.
S. EXCAVATETIiE INFILTRATION BASINTOTIiESPEClFlED DEPTH(ELEYATlON).
IT IS RECOMMENDED THAT ALL SUB MATERIAL BELOW lRE SPEClFIED
ELEV AnON SHALl. BE LEFT UNDISTURBED, UNt.CSS 011IERWlSE DlRECfED
BYnillENGlNIiliR.
6. GRADE TO THE DEPTIf lELEY ATION) SPECIFlEO IN THE CONSTRUcno."
DOCUMENTS UNLESS OntERWlSE DIRECTED BY TIlE ENGINEER.
7. IN TIlE EVENT TIlAT SEDIMENT IS INTRODUCED lNTO THE IlMP DURING OR
IMMEDlATELYFOLLOWING EXCAVATION, THlSMil.TERIAL WlLLNEEOTOBE
REMOVEDFROMTllE BASlNPRlOR TO INrrtATlNGTHE:NEXTSTEP lNTHE
CONSTRUCTION PROCESS SEDIMENTlHATHAS BEEN WASHED INTO THEBASIN
DURING TIlE EXCAVATION PROCESS CAN SEAL THE PERMEABLE MATERIAL
SlGNTFICANTL Y REDUCING TIlE INFIL lRA TION CAPACITY OF THE SOILS.
8. SEEDING AND INST AUAnON OF EROSION CONTROL IltANKET SHAll BE.
COMl't:ETImWITHIN48 HOURS OF FINAL GRADING.
9. INFILTRATION AREA SHALt. Bg5TAKED OFFOURING CONSTRUCI10NTO
RESTRICTHEA VY EQUIPEMENT TRAffiC FROM COMPACTING NATIVESOJl.S.
SPUTTER STRUCTURE
T.O.O",Sog
E.O.F.~ooa5
PlANTINALTRATlONBASlN
WrTHNATIYEYEGITATlON
(SEE SPECS)
3!4"-2"CRUSHEDROCl<
SEDIMENTTlW'
EXISTlNGGRADE
SANDALLFROM SITE PER ENGINEERS AP?ROVAl
REPlACEWlTH6"SANDVTOPSOIL
FROM SITE PER ENGINEERS APPROVAl
Infiltration Pond Detail
21'RCPOUT
"'"
6"WEIRWAU.
21" HOPE FROM
STMH#2
t
.@.
'"
~ "",o~"
INALTRATlONPOND
STRUCTURE TOP = S09.0
FlNISHEDGRADE4"MIN.
TOPSOIL&SEEDlNG\
NEENAHR_~65-J
OR EQUAL
T"
_.,.""'.......
~ ,';~'
~ ..
,
"'.>
"L
.':.
.a"OIA
:~ ~'
WEIR TOP = S07.5
21"RCPOur
8EHINDWALL
PRE-cASTRCf'MANHOLE
WITH GASKET@JOINTS.
Splitter Structure #1
12"RCPIN
FROMC8
6"WEIRWN.!...
W
ms
1ZRCPOUTTOOVERFLOW
srnUGTUAETOP = 5'09.0
FlNISHEO GAADE 4" MIN.
TOPSOIL&SEEDING\
NEENAHfl-2S65-J
OR EQUAL
~..m...................
I I I II I::':
1 :',
iii
.-
.-~
WEIR TOP "'907.5
,.
WITH GASKEF@JOINTS.
PAE-GAST RCP MANHOLE
12'RCPTOINFlLTFlATlON
PON0905.10-BACKSIOEWALL
Splitter Structure #2
MNDOT 3733.11YPE 1 GEOTEXI1LE
FA8RiCSECURELY ANCHORED
SANDBAG
,~
I
I
1
1
1
1
.
<
,
o
~.
~ ,,~
l
[ ~,
~"'"
I
Catch Basin Protection
l.: U
"
;0 ~~
i !'
i H
- ~~
I g~
, ~
~
I ~~ !
, >
,
CJ~ _ 3:
!II~~
Z~g~~
a:~~ ~&!
~~ li]5
~I"~
h~~
H~~
~~~~
U~8
~~ge :5
!i~~~ ~g
~d~ ~~
. ~
.
0 ,
;;;
~ ,
~ !
0
" ,
"
0
< ,
. 0
.. ~
= W
-, ~ to
tn ~ ,
c: a. dJ
';: ~~
~ ~ i!'Z
c: 12 gm
,_ lIl:;':w-
C') iI:~~~
.ii 5i:;::ii_ ~
.:;,:zu..
~(Ila12g
G) ~I~%
_ z9::5m
m aO~-;:::-
== ~ ~~~
000
E:d
(')
Z (f)
0 -'
I- ~
Cl ,ill
Cl '0
<C ~Z
x-
l<: ~~
II: ~([]
<C ~Z
a. ~O
I- 0;::
:J ~<(
~a:
Z ~
...J
W u:
N is
<C
:I:
'11.'
'j~.:~
h~!-'IHi
~~.~K .~
~.g_:;-O'
.
~
o
.
,
I
'I
1,
,.
.2.!20
~"iii
~.
~o,.....
j.j
"j
~!I
'I'
HI
""
~
~HILLS
MEMORANDUM
DATE:
June 6, 2007
PC Agenda Item 3.D
TO: Planning Commission
FROM: James Lehnhoff, City Planner
SUBJECT: Planning Case #: 07-010
Conditional Use Permit Amendment & Variance
Celestica, Inc (Charles Patterson)
4300 West Round Lake Road
ATTACHMENTS: 3D-I
3D-2
3D-3
3D-4
Supporting Documents
City Engineer and Building Official Review
Air Photo and Photographs
Site Plan and Supporting Materials
Requested Action
The applicants have requested a Conditional Use Permit (CUP) amendment to add 74 new
parking spaces at 4300 West Round Lake Road. The applicants have also submitted a variance
request to encroach on the 20 foot parking lot setback and to exceed the 65 percent impervious
coverage limit by .5 percentage points. The applications are contingent upon each other as
currently proposed.
Backl!round
1. Update
In March 2007, the applicant submitted a Conditional Use Permit (CUP) application to add
approximately 34 parking spaces at the property on 4300 West Round Lake Road. Upon
further review of the application and discussion with the applicant, it was determined that
further engineering and refining of the plans was needed. Therefore, the applicant requested
that the application be tabled while the plans were revised and more information was
gathered. The applicants have now submitted a revised set of plans for the parking
City of Arden Hills
Planning Commission Meeting for June 6, 2007
IlMetro-inet.us\ardenhillslPlanninglPlanning Cases\2007\Ol-0JO Celestica CUP Amendment (PENDING)\060607 -PC Report - Celestica CUP
& Variance. doc
Page 1 of 13
expansion. However, in addition to the CUP amendment, the applicant is also requesting two
variances. The previous set of plans no longer applies and can be disregarded.
2. Overview of Request
The applicants have requested a CUP amendment to add 74 new parking stalls to the south
parking lot of 4300 West Round Lake Road to create 482 parking stalls. The property is
cUITently operating under a conditional use permit; therefore, an amendment to the CUP is
needed to modify the site layout. Along with the parking lot expansion, the applicant will be
revamping the stormwater management system to accommodate the existing and proposed
expanded parking area. According to the applicant, the stormwater management system
upgrades are needed because during preparation ofthe revised parking lot expansion plans, it
was discovered that the ponds were not properly constructed when the property was
developed in 1996 and 1997.
The CUP application also includes two variance requests. The first variance request is to
encroach 11.28 feet into the 20 foot southern side yard parking lot setback. The second
variance request is to reduce the minimum landscaped area from 35 percent to 34.5 percent.
The variances are contingent upon each other and approval of the CUP amendment
application. On behalf of Celestica, ProTeITa Design has submitted a letter explaining the
background of the project and variance requests (Attachment 3D-I). The letter also
addresses the required variance review criteria.
Previous Approvals
A parking lot expansion request was submitted and approved by the Planning Commission
and City Council in 2001 in Planning Case 01-012a and 01-012b, which would have added
65 parking spaces. The previous approval did permit the applicant to exceed the impervious
coverage limit for the lot. Those approvals were not acted upon and have since expired.
The property has been subject to the following previous land use application reviews:
96-12 Conditional Use Permit (CUP) 7/2/96 (A)
Site Plan Amendment
97-23 (location of wall sign) 9/29/97 (A)
PUD Amendment
00-40 (increase size of trash compactor) 01/02/01 (A)
PUD Amendment
01-08 (dumpster enclosures) 06/25/01 (A)
PUD Amendment 5/2/2002 (A)
01-12a (Add 38 parkin9 spaces)
City of Arden Hills
Planning Commission Meeting for June 6, 2007
\\Metro-inet.us\ardenhillslPlanninglPlanning Cases\2007\07v010 Celestica CUP Amendment (PENDING)\060607 - PC Report - Celestica CUP
& Variance.doc
Page 2 of 13
PUD Amendment 06/25/01 (A)
01-12b (Add 27 parking spaces)
PUD Amendment
02-33 (Add outside nitrogen tank) 12/16/02 (A)
PUD Amendment
06-003 (Add two air handling units) 2/13/06 (A)
CUP Amendment
06-019 (Add outside nitrogen tank) 7/3/06 (A)
3. Surrounding Area:
North
Industrial
G-B: Gateway Business
Office space, manufacturing, and
warehousing
Office space, manufacturing, and
warehousin
South
Industrial
G-B: Gateway Business
East
Round Lake
West
Interstate 35W
4. Site Data:
Industrial
Office space, manufacturing, and warehousing
G-B: Gateway Business
11.54 Acres (502,485 sf)
The property is generally flat, but it does decrease in elevation toward Round Lake
and West Round Lake Road.
Gatewav Business Zone
To aid in the overall discussion regarding this application, overarching regulations for evaluating
projects in the GB Zone have been included from the Zoning Code. The regulations relate to the
purpose of the GB Zone, and the GB Zone's focus on flexibility and high-quality.
Section 1320.04 Subd 11: Purpose ofthe GB Zone/District:
Subd. 11 GB Gateway Business District
A. To implement that part of Arden Hills Comprehensive Development
Plan known as the 1-694/1-35W Plan.
B. To promote high quality, unified, large-scale development in a manner
similar to a planned nnit development.
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
IlMetro-inet.uslardenhil/s\PlanninglPlanning Cases\2007\07-010 Celestica CUP Amendment (PENDING)\060607 ~ PC Report - Celestica CUP
& Variance. doc
Page 3 of 13
C. To take full advantage of the site's location as documented and
described in the NE I-694/I-35W Plan.
D. To allow only development that will create an attractive enviromnent
and a positive image for this site, which is one of the most visible in the
community and represents the City's last major development site.
E. To protect the site's enviromnental resources.
F. To promote flexibility in land uses and development standards to
achieve the objectives ofthe I-694/I-35W Plan.
G. To allow development that will insure reasonable traffic operation on
the internal and surrounding transportation systems.
Section 1320.13 Special Requirements for the Gateway Business (GB) District.
Subd. 1 Procedure. The application and the administrative and review procedure
established in Section 1355.04 Subd 3, Conditional Use Permits, and Appendix A,
Procedural Manual, shall be followed for all development that involves new building
construction, modification of a building's exterior, or modification of the site. This
provision is subject to any modifications or additions set forth in this Section. The
prescribed procedure may be modified by the City to allow planning flexibility and to
encourage cooperative dialogue between the applicant and the City.
Subd. 6.E Parking. Parking requirements contained in Section 1325.06 shall apply.
However, these requirements may be adjusted by the City in the project review
process if the changes will more effectively accomplish the stated purpose of the GB
District.
Surface parking shall maintain a fifty (50) foot landscape setback from all public
streets and a twenty (20) foot landscaped area from exterior proj ect property lines,
except for access drives that may cross the setback area. Since the intent of this
parking setback is to provide visual separation for large scale developments service
stations with retail sales and services and with a car wash shall be exempt for this
particular requirement and instead shall be required to meet the general parking
setback requirements (a twenty (20) foot parking setback from any public street or
right-of-way and a five (5) foot parking setback from any side or rear property lines)
as stated in Section 1325.06.
Plan Evaluation
1. Parking Lot Regulations
Based on the office space and shift workers in the production area reported by Celestica, 450
on-site parking spaces are required:
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inet.us\ardenhillslPlanninglPlanning Cases\2007\07-010 Celestica CUP Amendment (PENDING)\060607 -PC Report - Celestica CUP
& Variance.doc
Page 4 of 13
1 spaces/250 square feet of
Office S ace: office space
Warehousin /Production: 1 space/shift worker
rotal
Section 1325.06 Subd 1.J
50,000 s uare feet of office s ace
250 ersons
200
250
450
There are currently 408 parking stalls on the property. To compensate for the inadequate
parking in the past, Celestica has had a parking agreement with the properties to the south for
off-site parking spaces. The subject property and the properties (1987 and 1887 Gateway
Boulevard) to the south are under the same ownership (Arden Hills Industrial, LLC), which
made a shared parking agreement relatively easy. However, due to the increasing need for
parking on the adjacent properties, the number of available parking spaces for Celestica in
the off-site parking area has been decreasing.
The plans that were first submitted had some discrepancies in the number of existing and
proposed parking spaces. Those discrepancies have been resolved in the revised plans. The
revised plans state that there are currently 408 parking spaces on the property. With the
proposed 74 space expansion, the number of parking spaces would increase to 482. The
parking expansion would put the property into conformance with the parking requirements in
the Zoning Code (1325.06 Subd 1.J). The current use is conforming to the Zoning Code;
however, the parking deficiency has arisen because when the building was constructed it was
thought that more space would be used for warehousing, which requires fewer parking
spaces.
The following regulations from the Zoning Code apply to parking lot expansions in the GB
Zone:
A. Regulation: Parking Lot Setback (1325.06 Subd l.D.5). The minimum side setback
for a parking lot in the GB Zone is 20 feet.
Proposal: The proposed parking will be 8.72 feet from the southern side property
line. A variance is required to encroach 11.28 feet into the southern side setback.
The parking lot to the south at 1987 Gateway Boulevard is about 55 feet from the
property line. It is unlikely that the adjacent parking lot could be expanded without a
variance due to the impervious coverage limit for the property.
B. Regulation: Landscaped Area/Impervious Coverage (1320.13 Subd. 6.A.5.b). At
least 35 percent of the property is required to be landscaped; therefore, impervious
coverage is limited to 65 percent.
Proposal: With the parking lot expansion, the total impervious coverage would
increase to 65.5 percent, which exceeds the impervious coverage limit by .5
percentage points. Therefore, a variance is required to reduce the landscaped area
\\Metro-inet.uslardenhi/lslPlanninglPlanning Cases\2007\07-0JO Celestica CUP Amendment (PENDING) \060607 - PC Report - Celestica CUP
& Variance. doc
Page 5 of 13
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
below the 35 percent minimum to 34.5 percent. Without a variance, the impervious
coverage could only be expanded by 15,000 square feet, which would probably
accommodate around 50 parking spaces.
Lot Coverage
Structure
Coveraae Other coveraae Total Coveraae Lot Size**
sf I Dercen! sf percent sf nercent sf
Existing 154,817 30.8% 156,804 31.2% 311.621 62.0%
Proposed 154.817 30.8% 174.304 34.7% 329,121 65.5% 502,485
Chanae 0 0.0% 17,500 3.6%* 17,500 3.6%*
Maximum 150.746 30% -- -- 326.615 65%
'percentaae Doints
**The lot size is not correct on the submitted survev.
According to the applicant's letter, the structure coverage slightly exceeds the 30
percent limit because a small portion of the property was taken to create the right-of-
way for Gateway Court after the Celestica building was constructed (Attachment 3D-
1). The files for this property do indicate that some property was taken for the
construction of Gateway Court, but Staff has been unable to find the exact amount of
area that was used for the road. The drawing submitted by the applicant shows what
was taken, but the exact number is not shown, Removing land from 4300 West
Round Lake Road would have adversely impacted the structure and impervious
coverage limit.
After the printed survey information was submitted to the City, it was discovered that
the lot size was slightly incorrect and is larger than the information printed on the
survey. The lot size is 502,485 square feet, which is reflected in the above chart.
C. Regulation: Lighting (1320.13 Subd 6.H). Lighting is required to be hooded,
concealed, or controlled.
Proposal: Two light fixtures are proposed to be added along the southern edge of the
expanded parking that will match the existing lighting. The new lights will be of the
same style as the existing lights, which are hooded.
2. Landscaping and Grading
The City does not have specific landscaping requirements for parking lot expansions in the
Gateway Business Zone. The landscaping requirements in the Zoning Code's procedural
manual only apply to building expansions. This property did have a landscaping plan as part
of its original development approval in 1996; however, the City does not have a final version
ofthe landscaping plan on file. Staff believes that it would be in the spirit and intent ofthe
City's landscaping requirements to require no net loss in the total number of trees due to this
City of Arden Hills
Planning Commission Meeting for June 6, 2007
\\Metro-inet.uslardenhillsIPlanninglPlanning Cases\2007\07-010 Celestica CUP Amendment (PENDING)\060607 - PC Report - Celestica CUP
& Variance.doc
Page 6 of 13
proposed expansion. A landscaping plan has been submitted (Attachment 3D-4).
The southern edge of the property near the proj ect area currently has a six to eight foot high
berm with 30 mature trees. The applicant is proposing to remove the entire berm and
relocate the existing trees to the south side of the expanded parking lot. Due to the small
remaining setback (8.72 feet) between the lot line and the edge ofthe parking lot, there
would not be sufficient space to effectively relocate all of the trees onto the Celestica side of
the property line. Therefore, the applicant is proposing to relocate the trees across the
property line to 1987 Gateway Boulevard. Although the adjacent property is legally
separate, it is under the same ownership as the Celestica property. The applicant, in
conjunction with the property owner, is proposing to create a landscape easement to protect
the newly landscaped area from future development. This proposal would provide
essentially the same amount of vegetative screening before and after the expansion, assuming
trees survive the transition.
Relocating the trees to the adjacent property makes this application somewhat unique. As
noted above, the adjacent property is currently owned by the same company, but that may not
be the case in the future. Relocating the trees to the adjacent property could create some
long-term management challenges for the City and the property owners.
Staff did consider the option of splitting some property from 1987 Gateway Boulevard and
attaching it to 4300 West Round Lake Road. Unfortunately, that would probably cause the
1987 Gateway Boulevard to become nonconforming.
It may be worthwhile exploring other tree relocation options that keep some or all of the trees
on the subject property and, where appropriate, within the remaining eight foot parking lot
setback. One option may be to eliminate some of the proposed parking stalls along the
southern property line to create landscaping peninsulas or islands with relocated or new trees.
Although only 450 parking stalls are needed according to the applicant and Zoning Code, the
proposal includes 482 parking stalls. Thirty-four ofthe proposed stalls are along the
southern property line. Eliminating some of the stalls along the southern property line would
reduce the intensity of the setback encroachment and slightly increase the landscaped area of
the lot. However, limiting the parking expansion to 450 spaces would effectively limit
employment expansion possibilities for Celestica.
If Excel would permit additional trees under the power lines on the western (front) side of the
property, some of the trees could be moved near Round Lake Road to provide more trees
near the road. Currently, there are very few trees along Round Lake Road in front of
Celestica compared to the other properties. There may also be room to relocate some of the
trees to the southeastern part of the property. While some ofthe trees could be relocated to
other spots on the property, some landscaping should remain between the two properties
along the southern lot line.
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\lMetro~inet.us\ardenhi//s\Planning\Planning Cases\2007\07-010 Celestica CUP Amendment (PENDING)\060607 - PC Report - Celestica CUP
& Variance. doc
Page 7 of 13
Wherever the trees are relocated, the applicant's certified forester did express some concern
in the original application about the viability of relocating some ofthe trees and, therefore,
the applicants have stated that they will replace the trees that cannot be relocated or do not
survive the relocation effort. At a minimum, replacement coniferous trees would need to be
at least six feet in height and deciduous trees would need to be at least 2.5 caliper inches.
Staff would also recommend that an escrow be set up to ensure tree placement for at least
one year after the project has been completed should any ofthe trees not survive.
3. Conditional Use Permit Amendment - Section 1355.04 Subd 3
Section 1355.04 Subd 3 of the Arden Hills Zoning Code lists the criteria for evaluating a
Conditional Use Permit. The Planning Commission and City Council shall consider the
effect of the proposed use upon the health, safety, convenience and general welfare of the
owners and occupants of the surrounding land, in particular, and the community as a whole,
in general, including but not limited to the following factors:
1. Existing and anticipated traffic and parking conditions;
2. Noise, glare, odors, vibration, smoke, dust, air pollution, heat, liquid or solid
waste, and other nuisance characteristics;
3. Drainage;
4. Population density;
5. Visual and land use compatibility with uses and structures on surrounding land;
adjoining land values;
6. Park dedications where applicable; and the
7. Orderly development ofthe neighborhood and the City within the general purpose
and intent of this ordinance and the Comprehensive Development Plan for the
City.
4. Variance Evaluation Criteria
To recap, the applicant is requesting an 11.28 foot encroachment for the parking lot into the
20 foot parking lot setback. The applicant is also requesting permission to decrease the
landscaped area from 35 percent to 34.5 percent (or increase the impervious coverage from
the 65 percent limit to 65.5 percent). The letter submitted by the applicant's representative
addresses the variance criteria (Attachment 3D-I).
A. Variance Review Criteria - Section 1355.04 Subd. 4.C:
Variances from the literal provisions of the Zoning Code may be granted in instances
where the strict enforcement would cause undue hardship because of circumstances
unique to the individual property under consideration. Variances shall only be
granted when it is demonstrated that such actions will be in keeping with the spirit
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\lMetro-inet.uslardenhi/lslPlanningIP/anning Cases\2007\07-010 Celestica CUP Amendment (PENDING)\060607 - PC Report - Celestica CUP
& Variance.doc
Page 8 of 13
and intent of the Code. "Undue hardship," as used in connection with the granting of
a variance, means:
. The property in question cannot be put to a reasonable use under
conditions permitted by the Zoning Code;
. The plight of the landowner is due to circumstances unique to the property
not created by the landowner;
. The variance, if granted, will not alter the essential character of the
locality; and,
. Economic considerations alone shall not constitute an undue hardship if
reasonable use for the property exists under the terms of the Code.
B. Additional Review Information:
Although State Statutes include guidelines for evaluating variances, the
interpretation and meaning of those Statutes have been impacted by various court
decisions. A somewhat common, though apparently incorrect, interpretation of
the written Statutes is that a property owner must show that they do not have
reasonable use of their property without an approved variance. The difficulty
with this standard is what counts as "reasonable use" of the property? Since most
properties could be construed to have "reasonable use" without a variance, this
standard was declared virtually insurmountable by the Court of Appeals.
A revised interpretation of the "reasonable use" evaluation criteria has emerged
from the Minnesota Court of Appeals. According to the City Attorney, a property
owner does not need to show that reasonable use for a property only exists with
an approved variance. Instead, the landowner must only demonstrate that the
proposed variation is reasonable for a particular property in a given zone. For
example, the property owner must only demonstrate that an addition that
encroaches into a particular setback is reasonable as opposed to showing that the
property would only have reasonable use with the addition.
While this is a much softer interpretation of reasonable use, the applicant must
still address all four variance criteria listed above.
5. Additional Review
The City Engineer and Building Official have reviewed the revised proposal and their
comments are included in Attachment 3D-2. Their comments do not impact the overall
design of the proposal.
The Rice Creek Watershed District has granted a CAPROC (conditional approval upon
receipt of changes). While this is not a full approval, the conditions placed on the permit by
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inet.us\ardenhillslPlanninglPlanning Cases\2007\07-010 Celestica CUP Amendment (PENDING)\060601 - PC Report - Celestica CUP
& Variance. doc
Page 9 of 13
the RCWD will not impact the overall design of the proposal. RCWD only evaluates the
stormwater management system and does not typically comment on variance requests.
Findinl!s of Fact
The Planning Commission must make a finding as to whether or not the proposed parking
expansion meets the requirements of the Zoning Code and if it would adversely affect the
surrounding neighborhood or the commnnity as a whole. The variance criteria must also be
addressed. Staff offers the following findings for consideration:
Generall'indings:
I. Celestica's use of the property is a conforming use in the Gateway Business Zone.
2. There are currently 408 parking spaces on the property.
3. Based on the number of employees, the Zoning Code would require 450 parking spaces
on the property. The property is currently not conforming to the parking regulations in
the Zoning Code.
4. The applicant is proposing to add 74 parking spaces for a total of 482 parking spaces,
which would bring the property into conformance with the Zoning Code in terms of
parking requirements.
5. The proposed parking expansion would encroach 11.28 feet into the required 20 foot side
yard parking lot setback thereby reducing the setback to 8.72 feet.
6. The proposed parking expansion would decrease the landscaped area on the lot from 38
percent to 34.5 percent, which is .5 percentage points below the 35 percent minimum
landscaping area requirement.
7. The two new proposed lighting poles will match the existing light poles, and the light
source will be hooded as required by the Zoning Code.
On the Conditional Use Permit Evaluation Criteria:
8. The parking expansion will not impact traffic conditions; however, it will reduce parking
congestion on the site and likely eliminate the need for off-site parking.
9. The expanded parking will not produce any permanent increase in noise, glare, odors,
vibration, smoke, dust, air pollution, heat, liquid or solid waste, or other nuisance
characteristics.
10. The expanded parking will have a positive impact on the property's drainage and
stormwater management. The revamped stormwater ponds will accommodate the
existing and proposed parking areas as well as correct a previous faulty installation. The
Rice Creek Watershed District has issued a conditional approval to the stormwater plan.
11. The expanded parking will not change the population density ofthe property. The
expanded parking is for existing employees.
12. It is unlikely that the expanded parking will negatively impact the character of the
neighborhood; be incompatible with adjacent land uses and structures; or will negatively
City of Arden Hills
Planning Commission Meeting for June 6, 2007
\\Metro-inet.us\ardenhillslPlanninglPlanning Cases\2007\07-0JO Celestica CUP Amendment (PENDING) \060607 - PC Report - Celestica CUP
& Variance.doc
Page 10 ofl3
impact adjoining land values. The relocated landscaping may have some short-term
impacts, but it is unlikely to have any long-term negative visual impacts.
13. The park dedication fee does not apply.
14. The expanded parking will not inhibit orderly development ofthe GB zone.
On the Variance Evaluation Criteria:
15. Given the permitted uses in the GB Zone, it may be difficult to put the building to full
reasonable use without adequate on-site parking.
16. As the applicant notes in the variance letter, the stormwater regulations have increased
over time, which has made it difficult to expand parking toward Round Lake Road due to
land requirements for the stormwater pond. While the heightened stormwater regulations
have made somewhat of a unique situation on the property, the proposed parking
expansion may go beyond the actual parking need for the building and property size.
17. The loss of property for Gateway Court, which occurred after this property was
developed, has created somewhat of a nnique situation due to the loss of developable land
area. This change to the property line caused the building to exceed the structure
coverage limit for the lot and reduced the amount of land that could be converted to
parking.
18. While the landscaping plan may need to be modified, the parking expansion is unlikely to
significantly impact the character of the neighborhood. The parking expansion is near an
existing parking lot and is not highly visible from Round Lake Road.
19. The expansion is not based on economic considerations alone. The proposal addresses
additional stormwater concerns and removes the need for off-site parking.
20. Parking is a permitted use in the GB Zone.
Notice
Notice was published in the Arden Hills/Shoreview Bulletin and notice was prepared by the City
and mailed to residents within three-hundred fifty (350) feet of the subject property.
Resident Comments
Staff has not received any letters, e-mails, or telephone calls from property owners or occupants
in regard to this planning case.
Staff Recommendation
Although Staff is recommending approval of the overall concept, Staff is reluctant to support
approval of moving most of the displaced 30 trees to the adjoining property. While there should
be some landscaping and trees between the two parking lots, Staff is recommending that the
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inet.uslardenhillsIPlanninglP/anning Cases\2007\07-0JO Celestica CUP Amendment (PENDING)\060607 - PC Report - Ce/estica CUP
& Variance.doc
Page 11 of13
landscaping plan be amended to keep all ofthe trees on the Celestica property. This could be
done through a combination of relocating the trees to other parts of the property and by
eliminating some of the proposed parking spaces to create landscaped islands or peninsulas.
Since the applicant has indicated that only 450 spaces are needed, some ofthe 482 parking
spaces could potentially be removed. Eliminating some of the parking along the southern
property line would also reduce the intensity of the setback encroachment and loss of landscaped
area.
As is the case with most variance review, evaluating the variance applications based on the
criteria in State Statutes can be difficult. While a different interpretation of the findings may be
reasonable, the findings currently support approval ofthe application.
Therefore, Staff recommends approval of Planning Case #07-010 for a Conditional Use Permit
Amendment and Variances at 4300 West Round Lake Road subject to the following ten
conditions:
I. The project shall be completed in accordance with the plans submitted as amended by
the conditions of approval. Any significant changes to these plans, as determined by
the City Planner, shall require review and approval by the Planning Commission and
City Council.
2. The applicant shall supply the required number of ADA parking spots.
3. The applicant shall comply with the City Engineer's memo dated May 21,2007, prior
to any site preparation or grading.
4. The applicant shall obtain all necessary permits from the Rice Creek Watershed
District, MPCA, and other govemmental entities and provide the City with copies of
such permits prior to the start of any site preparation or issuance of any permits.
5. The applicant shall amend the landscaping plan to keep all 30 displaced trees on the
4300 West Round Lake Road property. The revised landscaping plan shall be subject
to City Planner and City Forester approval prior to the issuance of any building
permits.
6. Any deciduous trees that do not survive the tree relocation shall be replaced with
another deciduous tree that is at least 2 caliper inches. Any coniferous trees that do
not survive the relocation shall be replaced with another coniferous tree that is at least
six feet tall. The replacement tree species and location shall be subject to City
Planner and City Forester approval. There shall be no net loss in the number of trees.
7. The applicant shall submit a $2500 financial surety to the City to ensure the viability
of the relocated trees and, if necessary, to ensure the replacement of any trees that do
not survive. The escrow shall be retained by the City for at least one year after the
completion of the proj ect. The escrow shall only be released upon successful
inspection of the trees by the City Planner and City Forester. The inspection shall
only take place during the growing season.
8. Any other dead or dying trees on the property shall be replaced upon completion of
the project and prior to the release ofthe financial surety.
9. Any excess dirt shall be removed from the property within two weeks of completing
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
IIMetro-inet.us\ardenhil/slPlanninglPlanning Cases\2007\07-010 Celestica CUP Amendment (PENDING) \060607 - PC Report - Ce/estica CUP
& Variance. doc
Page 12 of 13
the project. Permanently storing or dumping the dirt on the subject property shall not
be permitted without prior approval from the City.
10. The City Attorney shall draft a conditional use permit that shall be signed by the
applicant prior to the start of any site preparation or issuance of any permits.
Options & Proposed Motion Lanl!ual!e
The findings of fact currently support approval ofthe variances. To deny the variances, findings
that support the denial and are based on variance evaluation criteria must be stated for the record
prior to making the motion.
1. Recommend Approval with Conditions: Motion to recommend arJTJroval of Planning Case
07-010 for a Conditional Use Permit Amendment and Variances at 4300 West Round Lake
Road based on the findings of fact and the submitted plans as amended by the ten conditions
in Planning Case 07-010.
2. Recommend Approval as Submitted: Motion to recommend avvroval of Planning Case 07-
010 for a Conditional Use Permit Amendment and Variances at 4300 West Round Lake Road
based on the findings of fact and the submitted plans.
3. Recommend Denial: Motion to recommend denial of Planning Case 07-010 for a
Conditional Use Permit Amendment and Variances at 4300 West Round Lake Road based on
the following findings: findings to deny should specifically reference the reasons for denial
and why those reasons cannot be mitigated.
4. Table: Motion to table Planning Case 07-010 for a Conditional Use Permit Amendment and
Variances at 4300 West Round Lake Road: a specific reason and information request should
be included with a motion to table.
Deadline for Al!ellcv Actions
The City of Arden Hills received the completed application for this request on March 23, 2007.
Pursuant to Minnesota State Statue, the City must act on this request by May 23,2007 (60 days),
unless the city provides the petitioner with written reasons for and additional 60 day review
period. The City may, with the consent ofthe applicant, extend the review period beyond the
initial 120 days.
Attachments
3D-I Supporting Documents
3D-2 City Engineer and Building Official Review
3D-3 Air Photo and Photographs
3D-4 Site Plan and Supporting Materials
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
IIMetro-inet.us\ardenhillsIP/anninglPlanning Cases\2007\07-0JO Celestica CUP Amendment (PENDING) \060607 - PC Report - Celestica CUP
& Variance.doc
Page 13 of 13
Attachment 3 D-1
Supporting Documents
from the Applicant
~
~HlLLS
June 6, 2007, Planning Commission Meeting
James Lehnhoff
City Planner & recycling Coordinator
City of Arden Hills
In response to your request I have included an inventory of the trees that will be impacted by our plan to expand the
South Parking Lot at our facility located at 4300 West Round Lake Road, in Arden Hills. It is OUf intention to
remove the existing trees and replant all that are viable to further enhance the screening of the West end of the
parking lot along Round lake Road. New trees of 2" caliper size for deciduous, and 6 feet height for coniferous
species shall be provided in like quantities for what is to be removed for South Parking Lot expansion, additionally
at the conclusion of construction irrigation and sod will be installed to replace that which is disturbed by
construction.
Celestica has approximately 822 employees distributed across 3 shifts. Our estimated maximum parking
requirement is for 450 employees. This is distributed 200 employees in the office area and 250 in the production and
warehouse areas. With the expansion plans currently before us we would add approximately 42 spaces beyond the
present 408 spaces for a total of 450 spaces. It should be noted that some emp loyees do not drive, and some park in
handicap spaces. Though the number of spaces available to us in the adjoining lots continues to be reduced due to
increased occupancy of the buildings we continue to have some space available to us if any overflow is required.
The availability of this offsite parking is not guaranteed thus we will continue to monitor our need as well as the
needs ofthe surrounding buildings to determine the requirements for additional onsite parking expansion.
~~
Charles R. Patterson
Note from Staff:
This letter was submitted on 3-26-07. The proposed number of
parking spaces refer to the original proposal. JL
PLANNING
CIVIL ENGINEERING
PROJECT MANAGEMENT
LANOSCAPE ARCHITECTURE
Date: May 24, 2007
To: Planning Commission and City Council
% Mr. James Lehnhoff, City Planner
City of Arden Hills
1245 West Highway 96
Arden Hills, MN 55112
Re: Celestica Parking Lot Addition
4300 Round Lake Road West
Arden Hills, MN
Dear James, Commissioners and Council members:
Celestica has requested that we prepare the attached preliminary plan set and stormwater
management report to supplement the existing submittal application that is in process with the City of
Arden Hiils. As a result of the additional plans that are being submitted with this letter, we are
modifying our request to include review and approval for the following items:
1. Amend the existing Conditional Use Permit (CUP) to add 74 new parking spaces and modify
and expand the existing stormwater ponds at 4300 Round Lake Road West.
2. Request two variances that wiil allow for:
a. A reduction to the existing side yard parking setback from 20 feet to 8.72 feet for a
variance of 11.28 feet over a distance of 322.9 feet (30% of the length of the south
property line).
b. An increase to the lot coverage from the typical maximum of 65% (even though it is not
defined as such in the G-B Zoning District) to 68% which will allow for an increase of
12,532.65 square feet over the allowed minimum.
We were fortunate to have worked with Welsh Companies during 1997 and 1998 on the Gateway
Center project, which consisted of the complex of four buildings (including this structure) for this very
significant tract of land in the northeast quadrant of 1-35W and 1-694 that serves as one of the major
gateways into Arden Hills. Hopefully by providing some of the background thought into the original
project, we can maintain the integrity of the overall development while accommodating this very
important request for Celestica, a major employer of high quality jobs in the City of Arden Hills.
CURRENT PROJECT DESCRIPTION/EXECUTIVE SUMMARY
Celestica of Arden Hills, located at the intersection of Round Lake Road West and Gateway Court, is
requesting a parking lot expansion of 17,500 s.f (DAD acres) to accommodate the construction of an
additional 74 parking spaces on site. The motivation for completing this parking lot addition is
because of the reduction of available off-site parking spaces due to the successful growth of existing
businesses in the building to the south of this property. This has created a parking shortfall for this
7200 Hudson Blvd. Suite 110 OAKDALE, MINNESOTA 55128
PHONE (651) 739-8131 FAX (651) 739-0846
www.proterradesign.com
Page 2
Date: May 24, 2007
To: City of Arden Hills Planning Commission and City Council
% Mr. James Lehnhoff, City Planner
Re: Celestica Parking Lot Addition - 4300 Round Lake Road West, Arden Hills, MN
PROJECT BACKGROUND
complex of buildings which was not expected in the original design of the complex. It was assumed
that the ability for shared parking existed to accommodate these variable needs between the adjacent
properties. In essence this complex was designed as a Planned Unit Development even though the
designation was not officially given to the development by the City due to the G-B Zoning.
This 11.18 acre property is located at 4300 Round Lake Road West and is bordered by office
warehouse buildings to the north and the south. 1-35W is to the west and Round Lake is to the East.
The site is currently zoned G-B Gateway Business and is fully developed with a 174,304 square foot
office/warehouse building with parking surrounding the structure. The perimeters are well landscaped
and the furthest eastern slope on the property is naturally wooded.
The original design of the site with the loading docks placed on the south side of the building
concerned the City Council in the original approvals and as a result the south border of the property
was heavily landscaped. Subsequently, Welsh acquired the property to the south and the scope of
their Gateway Business Park project expanded to include the three existing buildings located to the
south of this site. As a result, we prepared an EAW for the overall development because of the scale
of the project and several natural features were protected or enhanced as a result of that process.
One of the outcomes of the expansion of the project was the re-routing of Round Lake Road West
and the addition of Gateway Court. The significance on this project is that this site was already
developed and additional right of way was needed from this site to create the Gateway Court cul-du-
sac. That is why the building coverage is slightly over (30.8%) the maximum allowable coverage of
30% for a one story building in this zoning district. This also impacted on the pervious/impervious
percentages for the property.
GRADING. DRAINAGE AND EROSION CONTROL:
The proposed grading to accommodate the additional parking surface will be a natural extension of
the existing parking surface grades and be accommodated in the existing storm sewer system
currently located in this portion of the property. Standard erosion control methods will be used during
the construction of the parking lot expansion to minimize erosion. The small scale of the project and
the short construction time line will also help to minimize any erosion impacts generated with this
construction activity.
STORMWATER DESIGN
In the process of analyzing the site's sub-watershed makeup, several options were analyzed to
provide for adequate treatment of the increase In storm water runoff. The first two options that were
reviewed were infiltration treatment or filtration treatment. Both of these options are dependent on
having soils that are conducive to storm water permeating the existing soils. Our geotechnical
engineering firm, Braun Intertec, analyzed the soils and their preliminary findings are that the soils are
7200 Hudson Blvd. Suite 110 OAKDALE, MINNESOTA 55128
PHONE (651) 739-8131 FAX (651) 739-0846
www.proterradesign.com
Page 3
Date: May 24, 2007
To: City of Arden Hills Planning Commission and City Council
% Mr. James Lehnhoff, City Planner
Re: Celestica Parking Lot Addition - 4300 Round Lake Road West, Arden Hills, MN
made up of natural and fill clay materials that are not conducive to infiltration/filtration methods for the
treatment of the first flush storm water events. With the possibility of infiltration/filtration methods ruled
out our next objective was to maximize treatment in the existing storm water retention/ detention
basins located on the west property of the Celestica site.
In our current analysis of the original construction of the retention/detention basins, it is our judgment
that the retention/detention basins were never constructed per the original plans or in such a fashion
that achievable rate reduction could have been attained. By correcting the two retention/detention
ponds located on the west side of the Celestica property the proposed storm water design for the
developed site has a lower runoff rate for the 2- year, 10-year and 1 DO-year events than the existing
site conditions for each storm event. The retention/detention ponds and the sub-catchments are
described in greater detail in the attached stormwater management report.
Due to the increase in impervious area, additional retention/detention pond volume will be achieved
through the reshaping of the two existing detention/ retention basins. In addition, the retention
detention basins will be excavated to maximize sediment volume within the constraints of the site. It
should also be noted that the existing wood weir structures are proposed to be removed because of
their ineffectiveness and their tendency to be degraded due to freeze thaw cycles causing the
structures to heave and break down. The proposed replacement skimmers will be achieved through
the use of inverted storm sewer pipes and manholes. These corrections are required to achieve a
rate control equal to or less than the storm water runoff from the pre developed site.
In addition, filtration components will be added to the existing pond basins that will further enhance
the water quality features of the on-site ponding system. The overall net result of the proposed pond
modifications is that the runoff reductions for the 2- Year, 10- Year and 1 DO-Year rainfall events are
87%, 34% and 27% (respectfully) of the current runoff volumes.
VARIANCE REQUEST
Here is PDA's response to the hardship criteria for the variance requested for Celestica Parking Lot
Addition:
1. The property in question cannot be put to a reasonable use if used under conditions allowed by the
official controls.
Response: The highest and best use of the properly In the Gateway Business District is for the
type of use with its high skl/l, well paying jobs that currently exist on the site. /n order to retain the
existing use in Its current /ocatlon, additional parking needs to be created on site because of the
reduction of available parking on the adjacent properly within the Gateway Business Center.
2. The plight of the landowner is due to circumstances unique to the property not created by the
landowner.
7200 Hudson Blvd. Suite 110 OAKDALE, MINNESOTA 55128
PHONE (651) 739-8131 FAX (651) 739-0846
www.proterradesign.com
Page 4
Date: May 24, 2007
To: City of Arden Hills Planning Commission and City Council
% Mr. James Lehnhoff, City Planner
Re: Celestica Parking Lot Addition - 4300 Round Lake Road West, Arden Hills, MN
Response: It was assumed in the original design that additional parking could have been created
along the western portion of the south parking areas. However, as the State of Minnesota's
stormwater rules have changed over the past 10 years (as Implemented by the Rice Creek
Watershed District) the existing pondlng needs to be expanded in order to accommodate new,
more restrictive requirements. With the RCWD approval that was granted on 5123107, their
requirement was to expand the existing ponds as much as physically possible, thereby eliminating
the potential to create additional parking in the location as originally anticipated.
3. The deviation from the Ordinance with any attached conditions will still be in keeping with the spirit
and intent of the Ordinance.
Response: The Gateway Business (GB) Zoning District allows for flexibility in setbacks if the
changes will more effectively accomplish the stated purpose of the GB District, which is as stated
in Subd. 11 GB Gatewav Business District as:
A. To implement that part of Arden Hills Comprehensive Development Plan known
as the 1-694/1-35W Plan.
B. To promote high quality, unified, large-scale development in a manner similar to
a planned unit development.
C. To take full advantage of the site's location as documented and described in the
NE 1-694/1-35W Plan.
D. To allow only development that will create an attractive environment and a
positive image for this site, which is one of the most visible in the community and
represents the City's last major development site.
E. To protect the site's environmental resources.
F. To promote fiexlbility in land uses and deveiopment standards to achieve the
objectives of the 1-694/1-35W Plan.
G. To allow development that will insure reasonable traffic operation on the internal
and surrounding transportation systems.
The planned unit development purpose of the Gateway Business Zoning District should allow for
the reduction of the sideyard parking setback that will allow for the construction of the parking as
proposed since it will be on an internal sideyard property line that lies entirely within the Gateway
Business District.
4. The variance will not create a land use not permitted in the zone.
Response: The variance will accommodate additional parking which is a use that is permitted in
the GB Zoning District.
5. The variance will not alter the essential character of the City.
Response: The essential character of the City within the Gateway Business District is to create a
high quality, unified, large-scale development in a manner similar to a planned unit development,
to promote flexibility in land uses and development standards to achieve the objectives of the 1-
69411-35W Plan and to allow only development that will create an attractive environment and a
positive image for this site, which is one of the most visible In the community and represents the
7200 Hudson Blvd. Suite 110 OAKDALE, MINNESOTA 55128
PHONE (651) 739-8131 FAX (651) 739-0846
www.proterradesign.com
Page 5
Date: May 24, 2007
To: City of Arden Hills Planning Commission and City Council
% Mr. James Lehnhoff, City Planner
Re: Celestica Parking Lot Addition - 4300 Round Lake Road West, Arden Hills, MN
City's last major development site. The existing development occurred because it satisfied the
objectives of the Gateway Business District.
6. The variance is not for economic reasons alone.
Response: The need for the variances is due to circumstances beyond the control of the
landowner.
7. The proposed use is permitted within the zone.
Response: The proposed accessory parking use is permitted within the Gateway Business
Zoning.
We look forward to meeting with the Planning Commission and City Council to discuss this minor but
very important project. We are confident that we have addressed the concerns and responded to the
variance findings to justify moving ahead with the project. We eagerly anticipate the ability to
construct this parking lot addition in 2007 and to provide an important improvement to the existing
Celestica site in Arden Hills.
Sincerely,
ProTerra Design Associates, Inc.
~4~
Alan A. Kretman, ASLA
CEO
attachments
Copy: file, 06101
7200 Hudson Blvd. Suite 110 OAKDALE, MINNESOTA 55128
PHONE (651) 739-8131 FAX (651) 739-0846
www.proterradesign.com
Page 6
Date: May 24, 2007
To: City of Arden Hills Planning Commission and City Council
% Mr. James Lehnhoff, City Planner
Re: Celestica Parking Lot Addition - 4300 Round Lake Road West, Arden Hills, MN
Exhibit A - Leoal Description
PARCEL 1:
The south 30 acres of the northwest quarter of section 21, township 30, range 23, except the west
884 feet thereof and except the following: beginning at the point on the south line of said 30 acres,
2033.0 feet east of the southwest corner thereof; thence east to the southeast corner thereof; thence
north to the northeast corner thereof; thence west along the north line of said 30 acres to a point
1768.0 feet east of the northwest corner thereof; thence south 28 degrees 41 minutes east 559.7 feet,
more or less, to the point of beginning, except part deeded to state of Minnesota in book "1729" RCR,
page 988 and book "2033" RCR, page 528.
PARCEL 2:
That part of the south 30 acres of the south half of the northwest quarter of section 21, township 30
north, range 23 west, Ramsey County, Minnesota, described as follows: beginning at a point on a line
run parallel with and distant 33 feet easterly of line 1 described below, distant 200 feet northerly of Its
intersection with the east and west quarter line of said section 21; thence run southeasterly to a point
on said east and west quarter line. Distant 220 feet easterly of said intersection; thence run westerly
along said east and west quarter line for 141.92 feet; thence deflect to the right on a non-tangential
curve, concave to the northeast, having a delta angle of 57 degrees 43 minutes 04 seconds, a radius
of 167 feet and a chord azimuth of 335 degrees 03 minutes 51 seconds, for 168.23 feet, more or less,
to an intersection with said 33 foot parallel line; thence run northerly on said 33
foot parallel line for 52.28 feet to the point of beginning; line 1: beginning at a point on the north line
of said section 21, distant 1180 feet east of the northwest corner thereof; thence run southerly at an
angle of 75 degrees 28 minutes 41 seconds from said north section line (measured from west to
south) for 1105.99 feet; thence deflect to the left at an angle of 17 degrees 04 minutes 13 seconds for
167.08 feet; thence deflect to the right on an 00 degree 44 minutes 14 second curve (delta angle 07
degrees 08 minutes 33 seconds) for 968.91 feet; thence on a tangent to said curve for 600 feet and
there terminating. Together with that part of the south 30 acres of the south half of the northwest
quarter of section 21, township 30 north, range 23 west, Ramsey County, Minnesota described as
follows: from a point on line 1 described above, distant 499.53 feet north of its point of termination, run
easterly at right angles to said line 1 for 33 feet to the point of beginning; thence continue easterly on
the last described course for 33 feet; thence run northerly parallel with said line 1 for 170.53 feet,
more or less, to the north line of said south 30 acres; thence run west on said north line to its
intersection with a line run parallel with and distant 33 feet east of said line 1; thence run south on
said 33 foot parallel line for 167.76 feet, more or less, to the point of beginning.
7200 Hudson Blvd. Suite 110 OAKDALE, MINNESOTA 55128
PHONE (651) 739-8131 FAX (651) 739.0846
www.proterradesign.com
Received
1,,'/\'1
1;ii-\1
THIS IS NOT A PERMIT
City of Arden Hills
You are NOT authorized to begin work on your project
NOTICE: If project is initiated without obtaining RCWD Permit,
the project will be stopped by the District Inspectors until the
permit is obtained.
At their meeting held on May 23, 2007 the Board of Managers of the Rice Creek
Watershed District took action on your Permit Application as shown on the attached
document. The following definitions may be helpful to acquaint you with our procedure
and effect timely permit issuance:
CAPROC (<;;:'onditional Approval Eending Receipt Of Changes) = The District has nearly
all exhibits required for adequate review and issuance of a permit; you have 12 months
from the meeting date to submit/satisfy the pending items as identified in the attached
Engineer's Report. No Extensions will be 2ranted bv RCWD Staff. After this
time, the application approval lapses and a new application will need to be submitted and
considered by the Board of Managers.
The attached page provides some general permit information that is also available on the
Rice Creek Watershed District Website (www.ricecreek.org)underPermits.This
information is provided to assist you with any remaining items identified in the
Engineer's Report for your application. Please contact the District if you need printed
copies of any of these forms or guidance documents. If you have any questions, please
call Ken Powell at 763-398-3070.
To satisfy pending items, applicants may submit electronic files
(.pdf or .jpg format) to permits@ricecreek.org or 2 paper copies
of all submittal items to the District with the exception of plan
sheets. Plan sheet submittals must include 2 full-sized copies,
and 1 reduced size (11 by 17 inches or smaller) or an electronic
file.
cc: RCWD File # 07-053
City of Arden Hills
SOME GENERAL PERMIT INFORMATIQN
(Available at www.ricecreek.orgunderPermits)
(Bolded text are files/links that can be downloaded and/or accessed via our website)
EASEMENTS
Many proposed projeCts that require or involve storm water ponds, infiltration features,
and/or wetlands are required to record drainage and utility easements over these features
utilizing the <Easement Template>. Legal descriptions of these easements must be
prepared by the applicant, reviewed and approved by the District, and then submitted to
the County Recorder's Office for recording.
STORMWATER MAINTENANCE
For projects involving stormwater ponds and infiltration features, applicants must
complete and record a <Stormwater Operation and Maintenance Agreement> for
these features unless a City assumes the maintenance responsibilities of these features as
indicated in a letter to the District. An exhibit and/or legal description that clearly
delineates and identifies all stormwater and infiltration features must accompany the
stormwater operation and maintenance agreement. A draft of this agreement with
accompanying exhibit must be submitted to the District for review and approval prior to
submission to the County Recorder's office. For all documents submitted for recording,
a copy of a receipt from the County Recorder's Office indicating that the documents were
submitted must be provided to the District prior to permit issuance.
WETLAND CONSERVATION ACT FORMS
For projects involving wetland impacts and replacement, State law requires the
preparation and recording of <Wetland Legal Forms> for the replacement wetlands on
the site. Instructions for completing and recording these forms are included in the
wetland legal forms document. The wetland legal documents require the applicant to
prepare legal descriptions of all replacement wetlands. These legal descriptions and the
forms must be reviewed and approved by the District prior to submittal to the County
Recorder's Office for recording.
PERFORMANCE SURETY $
Sureties are generally required of all applicants, and are set based on District rules related
to the scope and nature of the project. A surety is a monetary sum provided by the
applicant to the District. The District returns the money to the applicant after project
completion if all permit conditions are met. For surety amounts of $5000 or less, the
applicant must provide the District with a check made out to the Rice Creek Watershed
District. For surety amounts over $5000, the applicant must provide the first $5000 in the
form of a check and has the option of providing the remainder of the surety amount in the
form of a <Letter of Credit>.
ELECTRONIC SUBMISSIONS OF PENDING ITEMS ARE ENCOURAGED
AND SHOULD BE E-MAILED TO llermitsiW,ricecreek.org WITH THE
ASSOCIATED PERMIT APPLICATION NUMBER REFERENCED.
Rice Creek Watershed District Permit Application Number
07-053
Applicant:
Charles Patterson Consultant:
Celestica
4300 W Round Lake Road
Arden Hills, MN 55112
Ph: 651-604-3934
Fx: 651-604-2410
cpatter@celestica.com
Gregory Moris / Alan Kretman
Pro T eITa Design Associates, Inc.
7200 Hudson Boulevard
Suite 110
Oakdale, MN 55128
Ph: 651-739-8131
Fx: 651-739-0846
gregm@proterradesign.com
Purpose:
Final Site Drainage Plan for a 17,500," SF parking lot expansion at the
existing Celestica facility, 11.0'" acres.
Location:
Y, mile north of 1-694 and east ofI-35W, Arden Hills.
T-R-S:
30-23-21 bdc
District Rule: C & D
Recommendation: Conditional approval pending receipt of changes and outstanding
items related to:
Stormwater Management
1. Revised Pond Outlet Control Structures and pond filtration
system design (see Paragraph 3, Finding 2 for further
discussion).
Erosion & Sediment Control
2. Revised plan including. a revegetation implementation
schedule.
Administrative
,
3. Draft legal document with satisfactory form and description
granting ponding and flowage easements over all onsite ponds,
wetlands, and other hydrologic features.
4. Draft Declaration for Maintenance of Stormwater Management
Facilities acceptable to District engineer and attorney for
proposed onsite storm water management features.
5. Copy of receipt from County Recorder and signed/notarized
Emmons & Olivier Resources, Inc.
5/24/07
Permit Application No. 07-053
Celestica
legal document(s). Note that legal document(s) are to be
submitted by Applicant to County for recording only after
approval by District.
6. Copy ofMPCA NPDES permit application.
Stipulations:
1. An as-built survey of all storm water
management BMPs (ponds, rain gardens,
trenches, swales, etc.) is to be submitted to the
District for verification of compliance with the
approved plans before return of the surety.
7. Finalized plan set signed by a professional engineer.
8. Surety in the amount of $2,500.
Exhibits:
1. Permit Application dated May 3, 2007, received May 3,2007.
2. Stormwater Management Plan prepared byProTerra Design
Associates, Inc., last revised May 15,2007, received May 15,2007.
3. Existing Conditions/Removals Plan prepared by ProTerra'Design
Associates, Inc., dated May 3,2007, received May 3, 2007.
4. Preliminary Site Layout prepared by ProTerra Design Associates,
Inc., dated May 3, 2007, received May 3, 2007.
5. Preliminary Grading, Drainage & Erosion Control Plan prepared by
ProTerra Design Associates, Inc., last revised May IS, 2007,
. received May 15,2007.
6. Preliminary Utility Plan prepared by ProTerra Design Associates,
Inc., last revised May 15,2007, received May 15, 2007.
7. Civil Details Plan (2 sheets) prepared by Pro Terra Design
Associates, Inc., last revised May 15,2007, received May 21, 2007.
8. Preliminary Landscape Plan prepared by ProTerra Design
Associates, Inc., last revised May 15, 2007, received May 21, 2007.
9. Landscape Details Plan prepared by ProTerra Design Associates,
Inc., last revised May 15, 2007, received May 21, 2007.
10. Lot Survey prepared by Lot Surveys Company, Inc., dated April 26,
2007, received May 8, 2007.
Emmons & Olivier Resources, Inc.
2
5/24/07
Permit Aoolication No. 07-053
Celestica
11. Soil Boring Logs prepared by Braun Intertec Corporation, dated May
8,2007, received May 14,2007.
12. Preliminary Site Layout Plan prepared by ProTerra Design
Associates, Inc., last revised May 15, 2007, received May 15, 2007.
13. Email Response to 5-18-07 Engineer's Report prepared by ProTerra
Design Associates, Inc., dated May 21, 2007, received May 21,
2007.
14. RCWD Permit Files 96-119,97-69 and 97-139.
Findings:
1. This project entails a 17,500* SF parking expansion at the existing
Celestica facility on 11.0* acres. This site is riparian to Round Lake
but is tributary to Long Lake. Development of this site was
reviewed under RCWD Permit96-119.
2. Under existing conditions, runoff from this site discharges to two
onsite water quality ponds constructed under RCWD Permit 96-119.
Although the ponds were originally approved to provide rate control
and water quality treatment for the site per RCWD Permit 96-119,
the ponds were not constructed per the approved plans and are both
. currently undersized for their drainage areas for the 2.5-inch event.
This project proposes excavation of accumulated sediment,
maximizing available dead storage within the existing pond
footprints and installation of filtration benches for both existing
ponds. The existing baffled weirs are in poor condition and will be
replaced with manhole structures to provide skimming capability up
to the I-year event.
The submitted soil borings indicate that onsite soils are not
conducive to infiltration. Therefore, filtration benches are an
acceptable alternative to infiltration BMPs. Incorporation of
filtration BMPs in the area of the proposed parking addition was
pursued; however, a fire hydrant exists in the only feasible location
for a BMP and EPA regulations do not permit stormsewer
infrastructure within 10 feet of the hydrant. Therefore, the proposed
pond improvements and filtration bench satisfy District stormwater
management requirements for the site.
Revised filtration bench and outlet structure design is required
including the following specifications:
. Weirs must be incorporated into the proposed outlet control
structures maintaining NWL elevations,
. Draintile inverts along pond benches must be below pond
NWLs and elevations added to Filtration Bench detail
Emmons & Olivier Resources, Inc.
3
5/24/07
Attachment 3D-2
City Engineer and
Building Official Review
~
~HILLS
June 6, 2007, Planning Commission Meeting
~
EN HILLS
MEMORANDUM
DATE:
May 21,2007
TO:
James Lehnhoff, City Planner
Kristine Giga, Civil Engineer ~
Greg Hoag, Public Works Director ~
FROM:
SUBJECT:
Planning Case #07-010 Celestica Site Plan Review
The following are comments based upon a review of the submitted site plans dated May 7,2007:
General
. The proposed project will require pennits which may include, but is not limited to, NPDES, Rice
Creek Watershed District and City Erosion Control pennits.
. The plan sheets must be signed by a registered engineer.
. Maintenance of any utility improvements will be the responsibility of the developer, as the proposed
improvements are all within private property.
Sheet C3.1
. Please modify General Note 21 to reference the most recent MnlDOT Standard Specifications for
Construction.
. Construction Sequence Note I and Temp/Perm Sediment Control Schedule Note I should also
include receipt of the Rice Creek Watershed District Pennit prior to beginning work on the site.
\\RVNAS I\AHdata$\PR&PW\Enginecring\2007\PIanninL Cases\07-01 0 ~ Celestica _JuneApp.doc
~
~~ILLS
CITY OF ARDEN HILLS
MEMORANDUM
DATE:
May 9, 2007
TO:
Dave Scherbel, Building Official
Kris Giga, City Engiueer
FROM:
James Lehnhoff, City Planner
SUBJECT:
Planning Case #07-010
Conditional Use Permit and Variance
In February 2007, Celestica submitted a proposal to expand their parking lot. The application
was tabled at their request. They have now submitted a revised application that includes a
variance to encroach on the side yard parking setback and to exceed the impervious coverage
limit. Please review the application and submit your comments no later than May 23, 2007. If
any information is missing, please try to notify me as soon as possible so that I can inform the
applicant.
This application is tentatively scheduled for the June 6,2007, Planning Commission meeting.
I/J~
/b101
- M-~ "-r ~
/wJ-- ~i~~1~-:
;tJLieA ~,k1A ~ ~ - 0[ ~
~1~
tJY1k
~
~~
Attachment 3D-3
Air Photo and Photographs of the Site
~
~HILLS
June 6, 2007, Planning Commission Meeting
:;;:
~
~ .~ g ~ ~
H~~~~ ~)l;;q
~ H r:j f! ~ J! ~ i Ii
tIl:f~8.sbilX3::1Ilr:l..J:l,I}
I!!t~ \'\'\\lIliD
:;;:
o
"
,5
"
'C
g
"
o
'0
o
"
'" <8
;; '<>
8 ~
'.g,i.:a
68<
<8"
.5 ~ ~
",,,,,-1!
"'a-
15 Q..~
000
l:l g <u
'Oe~
c~ e
.8 e"'O
1<j..c
:s.<S~
S"'O.:s
8~~
" 0 8
"~ 8
'~B 8
il~ :s
"'~
.~ Cl;'"'"-
~"o
~ ~?2l
sE-e
" " "
~e~
0" "
gJ]~
0-
~gf"E
~1! 8
~ g:.e
o ~
.~ i3 <U
'OS8
00
""'"
.-.... c
"'0"
@iJ'Q
>>", g
~ @ <<l
" "
: 8 3
"IE 0
gou
~:2.s
s~r-
"'O~g
~"ON
:Sa<n
0,,""
~~ ~
:;;;~~
~36
~8o
~ ;68
.'i::'o s::
~ tI} e
.;:; 6 ~
g.'~..J
8'0
",.SF:
~]t--
..<<lO
fil]~
;;;S~
<.g1j
tl @
'"
i5
o
~
'"
Vi
~
o
'"
~
8
,!lId d~~
t<.!!I1: ~~!!ili~
-u9x.:f:",..a-8 ir_~
]; -!321i:! .... -.IO!
if~IJ..h1.!!;J~hfi
~
o
.~
"
.C
~
"
o
<5
"
"
] ..s
. ~
.~ .~
~b:a
EO
.s~<
.5 ~ If
"'..~
"8:3-
o P<.!:S!
esl;l
~o..,
o e'<;;J
a~ e
'-g ;:]
:s..s~
f~.B
" " 0
.08
..0 8
';;30
. . "
e:;..s!
:Blab
E-< ~~o
o~N
a]'@
. . .
~a:l~
<I) ::a . ~
;g_1=] ~
O~..,
.0 ",.
-8.$~
"'0"80.1
~ gbe
&e
.s ~ <I)
o~8
00
.0'"
....... d
.., o.
!ail~
~.g ~
~ :
~ 8 S
...lB 0
gou
-"
lij<~..s
s~r--
"'O~g
~"'ON
i5avi
"0",
e:a e
B":.~
ao'~
OS"
';08
.""
..s.~8
.~ ~ ~
. " ~
'-.g ~
1ij<c<;l>-l
8> 0
"'~~
~!1":
Cig~
~B"'
<.g-g
.J .
~ ::E
is
'e
eIIl
o
~
~
~
eIIl
..:l
'e
=
=
o
~
....
~
~
~
=>
=>
r"l
"1'
.
8
~
u;
'"
~
on
en
OlCD
C CD
~.b
'--0
eo C
a. eo
-0 E
CD '-
-0 CD
C.c
eo
a. CD
X.r:::
CD-
-
CD 0
.r::: C
I- 0
. :+:i
E eo
'- u
CD 0
.c CD
CD.r:::
.r:::-
-C
- --
eo CD
Ui.c
eo-o
CD-
:J
010
.~ 3:
~ eo
o CD
o '-
...J eo
CD
.r:::
I-
eo
CD
'-
eo
Ol
C
32
'-
eo
a. .
~
3:-
CD~
C--
'-
CD~
.r:::.r:::
--
-0 :J
'- 0
eo en
3:-0
o CD
->
_0
~ E
CD CD
.r:::.c
1:-0
0_
C :J
010
C 3:
32 en
o CD
o ~
...J_
-
en
CD
$
E
.g
eo
CD
'-
eo
Ol
C
32
'-
eo
a.
CD
.r:::
-
-0
'- .
eo-o
3: eo
o 0
-0:::
-
en CD
eo~
CD eo
0l...J
C-o
-- C
~ :J
o 0
..:10:::
en .
CD-O
~ CD
->
CD 0
.r::: E
I- ~
ro E
~ Q;
eo.c
OlCD
C.r:::
.- -
-t:-o
eo C
a. eo
3:Z'
CD.r:::
C Ol
Q)S
.r:::.r:::
--
-0 :J
'- 0
~ en
0-0
- CD
- >
en 0
CD E
3: CD
Ol.c
.~ -0
~-
o :J
o 0
...J 3:
Attachment 3 D-4
Site Plan and Supporting Materials
~
~HlLLS
June 6, 2007, Planning Connnission Meeting
Celestica
f arking Lot Addition
ARDEN HILLS, MINNESOTA
,
,
,
:
:
I !
, '
I i
~~-l!L
\1
~ I
j I
I: ,
,\ i
p :
, I
I '
i'I'
I'~ i '
0, '\
I~ I
Ii I \
0' \
l'" --~~
I~
I
,
I
LEGAL DESCRIPTION (P.I.D. 213023230012)
PARCEL 1:
THE SOUTH 30 ACRES OF THE NORTHWEST QUARTER OF SECTION 21, TOWNSHIP 30. RANGE 23, EXCEPT THE WEST 884 FEET THEREOF AND
EXCEPT THE FOLLOWING:
BEGINNING AT THE POINT ON THE SOUTH LINE OF SAlD 30 ACRES, 2033.0 FEET EAST OFTHE SOUTHWEST CORNER THEREOF: THENCE EAST
TO THE SOlITHEAST CORNER THEREOF; THENCE NORTH TO THE NORTHEAST CORNER THEREOF; THENCE WEST ALONG THE NORTH LINE OF SAID
30 ACRES TO A POINT 1768.0 FEET EAST OF THE NORTHWEST CORNER THEREOF; THENCE SOUTH 28 DEGREES41 M1NlITES EAST 559.7 FEET,
MORE OR LESS, TO THE POINT OF BEGINNING, EXCEPT PART DEEDED TO STATE OF MINNESOTA IN BOOK "1729" RCR, PAGE 988 AND BOOK
"2033' RCR, PAGE 528:
PARCEL2:
THAT PART OFTHE SOlITH 30 ACRES OF THE SOlITH HAlF OF THE NORTHWEST QUARTER OF SECTION 21, TOWNSHIP 3() NORTH, RANGE 23 WEST,
RAMSEY COUNTY, MINNESOTA. DeSCRIBED I>S FOIl.OWS:
BEGINNING AT A POINT ON A LINE RUN PARALLEL WITH AND DISTANT 33 FEET EASTERLY OF LINE 1 DESCRIBED BELOW, DISTANT200 FEET
NORTHERLY OF rrs INTERSECTION WITH THE EAST AND WEST QUARTER LINE OF SAlD SECllON 21; THENCE RUN SOlITHEASTERLYTO A POINT ON
SAID EAST AND WEST QUARTER LINE. DISTANT 220 FEET EASTERlY OF SAlD INTERSECTION; THENCE RUN WESTERLY ALONG SAID EAST AND
WEST QUARTER LINE FOR 141.92 FEET: THENCE DEFLECT TO THE RIGHT ON A NON.-TANGENTIALCURVE, CONCAVE TO THE NORTHEAST, HAVING
A DELTA ANGLE OF fiT DEGREES 43 MINlITES 04 SECONDS, A RADIUS OF 167 FEET AND A CHORD AZIMUTH OF 335 DEGREES 03 MINUTES 51
SECONDS, FOR 168.23 FEET, MORE OR LESS, TO AN INTERSECTION WITH SAID 33 FOOT PARAl.l..B.. L1NE;THENCE RUN NORTHERLY ON SAID 33
FOOT PARALLEL LINE FOR 5228 FEETTO THE POINT OF BEGINNING;
LINE 1: BEGINNING AT APOINT ON THE NORTH LINE OF SAID SECTION 21, DISTANT 1180 FEET EAST OF THE NORTHWEST CORNER THEREOF:
THENCE RUN SOlITHERLY AT AN ANGLE OF 75 DEGREES 2B MINUTES 41 SECONDS FROM SAID NORTH SECTION LINE (MEASURED FROM
WEST TO SOlITH) FOR 1105.99 FEET; THENCE DEFLECT TO THE LEFT AT AN ANGLE OF 17 DEGREES 04 MINUTES 13 SECONDS FOR
167.Cl8 FEET; THENCE DEfLECT TO THE RIGHT ON AN 00 DEGREE 44 MINlITES 14 SECOND GURVE (DELTA ANGLE 07 DEGREES OB
MINlITES 33 SECONDS) FOR 968.91 F.EET: THENCE ON A TANGENT TO SAID CURVE FOR 600 FEET AND THERE TERMINATING.
TOGETHER WITH
THAT PART OF THE SOUTH 30 ACRES OF THE SOUTH HALF OF THE NORTHWEST QUARTER OF SECTION 21, TOWNSHIP 30 NORTH, RANGE
23 WEST, RAMSEY COUNTY, MINNESOTA DESCRIBED AS FOlLOWS:
fROM A POINT ON LINE 1 DESCRIBED ABOVE, DISTANT 499.53 FEET NORTH OF ITS POlNT OF TERMINATION, RUN EASTERLY AT RIGHT ANGLES
TO SAID LINE 1 FOR 33 FEET TO THE POINT OF BEGINNING; THENCE CONTINUE EASTERLY ON THE LAST DESCRIBED COURSE FOR 33 FEET;
THENCE RUN NORTHERLY PARALLEL WITH SAID LINE 1 FOR 170.53 FEET, MORE OR LESS, TOTHE NORTH LINE OF SAID SOLITH 30 ACRES; THENCE
RUN WEST ON SAlO NORTH LINE TO ITS INTERSECTION WITH A LINE RUN PARALLEL WITH AND DISTANT33 FEET EAST OF SAlD LINE 1; THENCE
RUN SOlITH ON SAID 33 FOOT PARALlEL LINE FOR 167.76 FEET, MORE OR LESS, TOTHE POINT OF BEGINNING.
DRAWING INDEX
CO.1
CO2
C1.1
02.1
03.1
04.1
C5.1
L1.1
L2.1
COVER SHEET
CERTIFICATE OF SURVEY
EXISTING CONomONS f REMOVALS PlAN
SITE LAYOUT PLAN
PRELIMINARY GRADING & EROSION CONTROL PLAN
PRELIMINARY tmLlTY PLAN
CIVILDETAllS
LANDSCAPE PLAN
LANDSCAPE DETAILS
CITY
CITY OF ARDEN HILLS
1245 WEST HIGHWAY 96
ARDEN HILLS,MN 55112
PH:651.792.7600 FX:651.634.5137
'I-
~
OWNER
=-=\
,
,
,
,
,
,
.
.
,
.
ARDEN HILLS INDUSTRIAl, LlC. C/O UNITED PROPERTIES
TODD HANSONfANITA VIETH
3500 AMERICAN BOOULEVARD WEST, SUITE 200
BLOOMINGTON, MN 55431
PH: 952.831.1000 FX:952.820.8737
APPLICANT
CELESTICA
CHARlES PATTERSON
4300 WEST ROUND LAKE ROAD
ARDEN HILlS, MN 55112
PH:651.604.3934 FX:651.604.2410
--
(~;-.~'~,
'...____-----,
ENGINEER!
LANDSCAPE ARCHITECT
PROTERRA DESIGN ASSOCIATES, INC.
GREGORY D. MORIs! ALAN KRETMAN
7300 HUDSON BLVD., SUITE 220
OAKDALE, MN 55128
PH: 651.739.8131 FX:651.739.01l46
..",.. - i-in
---
SURVEYOR
lOT SURVEYS COMPANY
7601 73RD AVE. NORTH
BROOKLYN PARK, MN 55428
PH: 763.560.3093 FX: 763.560.3522
GATEWA.YCOURT
'1
(
)
J
- -- - --- -----;.----------
V \
\
\
,
\
,
\
,
,
\
'\
'\
'\
'\
,
,
\
,
.C_____:_________~~::
~.
?
.
.
VICINITY MAP
<
LEGEND
EXISTING
"
0 ~J'OWER?Oi..E
@ ~SEPT1C
.. ~HYDRANT
><
0 ~STORMSE'I\IERIoIANHOlE
~ ~CA.TCHBA.SIN
" ~O!;OOTESGATEVALVE
.
" ~DEOOTESTEl.EPHONEBOX
PROPOSED
~ ~s.owrARYSEWERw.tlHOl.E
*.~
8 ~STOR:MSEwERMANHOlE
IiiiI "CA-TOiIlASIN
M "OENOTESGATEVALVE
-n-""-"OENOTESWA.TERLINE
-1-~DENOTESWATERlINE
_f>_"'__ ~ DENOTES SI\NITARY SEWERUNE -~- ~ DENOTES SANITARYSEWERUNE
-----n:_",,_ ~ DENOTES STORM SEWERUNE -_ E DeNOTES STORM SEWERUNE
'--....~"-_. ~EXISTING'ZCONTOUR
...........,~............"EXISTlNG'O'COmoUR
.....--.."'---'~PRO~=O'ZCONTOUR
.....--..~............"F'RO~ED'O'~UR
PREPARED FOR:
~
'"
~~~
@~~L:>
;:> ~..,f..--l
o~gr!i
-<"'-'--';;
U!;;5::211:!
!;;",zPiiB
'""'"~Z ..
-'0 0><
B~ g:~
REGISTRATION:
I hereby certify thot this
pion, specificolion, or
report wospreporedby
me or under my direct
supervision. ona thai I
om 0 dulJ' Registered
Londscope Architect
under the 1011'S of lhe
stoteof Uinneso\o.
-
"^" , ><REnAAN
,-~--
05.07.07
-
15144
--
I
I
i
I
!
,
!
i
,
i
!
i
1
,
,
;
;
!
!
,
,
!
,
,
,
!
!
!
,
!
~
~~
~;
~~
~~
,~
~i ~
l1l:;...
......iIl
U]
:i:>c~
..~
I
REVISIONS:
~ Dale: /10m;
L~ClTYSUBMIlT""
tl
Z ~
t:2Z5liii
~o~g
"'" ti'Jjl
2J~~ tl
i~~~:f ~
i ~ ~ ~~ p::
j trJ b ~9! g:
Ju~~<! 8
~
1
!
l
,
I
i
i
,
,
!
P<OjedNo: 06101
DluwnBy. MLS
ChIIcIrlIOBy. AAK
0_ 05.03.07
-
CO.l
T ~~~~?~y
I '~~M5'J9
,I I
~ [
I l! I
MJRTH LINE OF THE SOUTH 30 ACR~ OF THE NIt 1/4 Of'SEd 211 TJIf'. .JO, R.
N 89~'52"E '\ Jtf./2 _..1 j I ~'I ~
-----------.--------I---'--~:l::- ra::w (::-
I I ;7t.S
I I
I I
I
I
I
I I
I I
I I
I I
I I
I I
I I
I I
I I eleV,a
I I '"'
t=> .~
'I I Approximate loeatlon of Samtary Sewer
Easement from Ramsey County Quarter
I t Secllon Maps.. Documentation not provIded
I I
I I
I I
L_-1
I
I
i I
i I
i I
i I
i
i I I ] I I
i JJ~APProximle ~jon of 130' 1 CO.
I' I I Transmission line;Eosement p';'tRomsey
County Ol1'arter S<tction Mops, 1
j I documentfDn no~ pr~
,i I h. i j i! "
U"~I~ \, ~! ~ \ '//~17
-._---',
~.;;--..-.-..-.-.
~~tegJ
----- " .------ ----~-~
"F-~;--;---h-----~==~.i;"..-:::;~~~~~~;::.;:::::=::~~=:::::::::::::::=::~::~~:~:~:~~~~~.~;;::--:- --
~.SD r::~~ arm a Dr c,~~r~n
i
I
j,
J
il
,ato
Ii
Ii
."
l
""
~
~
'"
hydrant
."
_.~
,::~--
,-
~m
verho
627.5
s
'" "
M
0
Z ~
>- ~ <;
~ 0 N
:r:
BUILDING
5600
_h____________.
Co<1Ctst
-._-...._---~_::'-.-_..
.-'
I l---W'f>.fJit
I ,/ ygSJH~
lEGALOESCRlPTlOlt
Parcell:
The South 30 oerea of the Northwest Quarter of Section 21, Township 30, Rangll 23, exCllpt thll West 884 feet th&reof end
except the f010wing:
r:g~so~:~~~~n~e;t~enn: ~~~i103Oth:cN~~g,,3f'~~ ij,~egt, ~n;:1=~~~e th~f;~~~ie~i~st
~r~"';,~ ~,o t~~ ~~~~'Oo:~~II~~g.o~x~l~~~~c:n:~ ~~~:"~ ~r:'eeso~~~ ~0:"~;72s9~~,~~e E~~ ~~~.7~~~
"2033"RCR,p09ll528:
Parcel 2:
That part of the South 30 oeres of the South HcIf of the Northwest Quarter of Section 21, Township 30 North, Ron9ll23 West,
Ramsey County, MImesotc, described os foncws:
Se!llMlng ot 0 point on 0 ~roe run parallel wIth end cfIstlrlt 33 feet Eosterly of Linfl 1 described below, distant 200 feet
NorthorIy of its intersection with the East ond West quorter rlne of soid Section 21; thence run Southeasterly to 0 polnt on
said East end West quarter rme. dlstont 220 flllrl Eosterly of &<lid intersection; thence RII1 Westerly oIOI1g SOld East ond
:~~~ ~r5t;rd~~~';: l~e;,,~~;e04de:~, ~r~~ ~ ~6~~t~ ~lI,~i~~eofto~~e d~~0~1 ~~es 51
eSCDnCll, for 168.23 feet, more or less, to on Intersection with said 33 foot paro~el line; thence run Northerly on sold 33
foot paronel rme for 52.28 feet to the point of beginnino;;
Line 1: BeginnIng ot a point on the North rlne of soid Section 21, distant 1180 feet Eost of the Northwest comer thereof;
~:J"toS~"ffo~l ~5~9ar;~ O~~edeZ:~t ~ ~nuI:~ U :c=~ :t1/~~gr~~04~~~~!~e1im=~~ ~m
167.08 feet; thence deflect to the rillht on On 00 degree 44 minutes 14 eecond ClFVe (delta cn~e 07 de~rees 08
minutes 33 seconds) for 968.91 feet: thence on e tangent to sold curve for 600 feet end there terminating.
togeltter with
That port of the South 30 ocres of the South Kolf of the Northwest Quarter ofSecllon 21,Township 30 North, R ""!Ie
23 West, Romoey County, Illmesotodescribed as follows:
From 0 point on Linll 1 described above, dlstant 499.53 feet North of its point of terminotlon. run Eostllrly at right ongles
to soid line 1 for 33 feet to the 1?';'int of belliMing; thence cor<tinue Easterly OIl the lost described course for 33 feet;
~~estrun on~i~ll.J::r:r~ rc:~tsllD~te~~:Ct!O:"'.;iJ7~'~lIfe~ ~~cflel~l~h~n~o Q~~o~ ~~ oJos~i~l~~ ~e ore:.;.,~~nce
run South on soid 33 foot pcrollell1ne for 167.76 feet, more or less, to the point of begl,.,in....
Property Address:
4300 Round lake Rood W.
Arden Hills 55112
pid #21.3023.23.0012
---".
-----~~~~~~-~~~~~~).'.~.'k \ \\
11[.12 ','gto><;> , \
,c:::::::~;:;~~~:,:.::::,~\ \ (! \ \
."
"
~
o
c_
'to
~
'"
u
,
'"
""
]
!
fIrst
91009
f/<>er
~
-.-------
.....,....~J
"7
o
~
'-'
"
163.5
.,r,
IIOJ.29
'"
NOTES:
~d l;~ot~~~ba~~s o~f fiU;~er~~~ro~ 6i'1i~I~lliI~~ur':~~n c~~~pproximate
with ovoill;lble dato provided by various ~ources. Utmtles shown ere dependent
on the cO"1'lotencss ondoccl/l"ocy of data provided. This survey doe!Inot purport
to show 011 undergrol.ll1d utilities. Verify on uWitil'll critical tc construction
or design.
~fut~~~r~:~ ~~~at?:: CALL 01 651-454-0002 for precise OIlSite locotion of
3.) nUs SUl'Vey wosprepored without the benefit of current title work.
Easements, oppurtenances, and encumbrlll'loes may exist in addition to those shown hereon.
This survey is subject to revieion upon receipt of 0 current title insurance commitment
or ottorney's title oplniorL
SCALE
I
o
" FEET
I
50
I
100
I
50
ORIGW1l OATE.4-13-07
fEUl BY: ~
DRAWNSY' ~
ClECKEDRV. r":A
.~
4-30-07oond
5-07_n7 .~nl"/M,d....
I HEREBY CERTFYTf-tI"T THIS PLAT,PLAN.
SPECIFICATION OR REPORT WAS PREPARED
BY ME OR UNDal MY DIRECT SUPERVISION
AKJ THAT 1 AN A DU..Y REGIS1EREDI..AAtl
SURVEYOR UNDER TIE LAWS OF TI-E
STATE OF MN€SOTA.
INC.
SURVEY FOR:
PROTERRA DESIGN ASSOCIA TES
PREPARED BY:
LOT SURVEYS COMPANY.
LAND SURVEYORS
7501 73RD AVE. NO.
BROOl<l YN PARK, MN 55428
Ph. (763) 560-3093
Fx. (763 560-3522
7200 Hudson Blvd.
Suite 110
Ookdole, MN 55128
ph 651-739-8131
.-
DATE~REG.NO~/21-3D-23/At>gc7S0S7cortificClle.scj
",."'-
76067
fB 1034-4S
"
I'
il~-J~ \
.'-.......
'----',
I
I
l.lAlmM
.,.
o
~
COWRACTDRSHI.LL
~7~::"j'
C~TCI1 B~SlN
l.lIJ<HOIr
n~69{}21
IW(N):61189~
:l;;::~ )
""""'''f
~~~_~i~~ fj1
PlV=S7H4 :s:
~
~
10
_n___nJ~_
7
\
'\.
GENERAL NOTES
LEGEND
1. COOlllAClOllSHM1CONTACT"GOPHtRS1AlEOOEt:All".TWO BUSINESS OAYSPRIO!lTOEXCAVAllONAND!OR
COOSTRUCllON. rORUllUTi'LOCIIllOO5. Ti\1NOllESMElllOAREA: 651.~~.OOOZ; lU.L-.fREE: 800.251.1'66; OR (JHJNE
J>.1:WWl\'.GOPHERSTAlEONECA1UIlG
2. lHESiO"lrn LOCAnoN OF Da5TlllG IJNt)ERGRCKlNQ UilUllrs IS IIN APPllOXlIdAlEWCWotI ONLY AND AA"tNOTBE[N
INDEPENDnlll.Yl'ElllFlED. 1IIE DlACT LOCATION OF o\ll.UlUJTlESUUSTOCVERIFIEDPRlOR TO COMM[N(;INC lKlRK.
CONTRACTtflSKl\llFElIlVERlFYMLOc,o,l1ONSIJlDElrVAllONSOFEXiSTlNCUTUT\ESANOTOPOGR.o.PHICFrAlURES
PRIOOTOSTARTOFSllEEXCIIVAlloo.1HECll'IlllACTORSIlAU.I!.Il.!EDUlTaVNOllfYlHEPROJ::CTENGlNEEROfANY
DlSCREPANWORVARIAllotlSfROI.IP~.
3. iHE CONlRACTOR At;REES TO BE FUUYRESPONSlIllE ,llRANYAND AI.l.DAAlAGESlIlilCH UIGHT BE 0CCASl0NED BY
lHE FAlLOREOFlHECONTRAClORTOEXIlClLYLOCAlE AND PRESERIIE ANY oUlD Ml UNDERGllOONO LrnllllEs.
4. o:JSnNC SURVEY INFORW/,noN PROWlED BY LOT SUR\lE'l'S COMPANY. DaSllNG TOPOGRAPHIt INFC1l~All(ll PROWlED
BY lOT SUR'oUS COMPANY_ PROlERRA OESlGII ASSOCIATES, INC. SHAU NOT BE RESP0tl5lBl.[ FOR lHE M:CURA~Y OF
INFOIUIAll00 PRDYllED BY lOT SUR\E'l'S COMI'I.NY WNCERN~G ~G INFORMAllON.
5.D1SilNI>UilUTYAS-BUILlINFORMAllONPROVIDE!lBYClTYOFl\RoENHlu.s.PRoTUlIUDESlGNASSOClAlE5.lNC.
SHI.l1 NOT BE RESPOOSlBlI rORTHE AcaJlUCY OF INFORMAilOO PROVIDED BYlHE CITY OF AAOCN HIUS CON$ING
AS-BUIlTINFllilWATlON.
~
PROPOSED
@
;.
~ ~ SANITAAYSEWER MANH(li
~ ~HYDRANl
tx:lpp mGAlEVAlVE
0. mpllWEllPOlE
,
@ "lE!.U'HONEBOX
Ii ~ STORI.(SE'II!:R MANHctE
1m mSTORl,(SE'/lERCII1CliBASlN
"SIiNITI\RYsrwE!lMAllHOI..[
~ HYIlRAIlT
..
'"
H
"
..
"
.
.
-.-
-1-
-",,-
---,"--,
---,"--,
~ GAlE VAlVE
,;u
- ""
"STORM SEl1ER I.!ANIlmr
"STORM SE\\rnCAT01 BASIN
"SllllWSEll[RWEIR
E FlARED END SECllON
_flAAEDENDSECTI\WW!RIPRAP
_SANlTIIRYSElIERUN'E
EWAlERlJNE
_STORMSE\\rnUNE
-2'CllNTOUR
~ 10' CONTOUR
t> _FlAAWl:NDSECTlON
-E;-5A-~- _SANITARYSOIERUNE
-n-v.~M- "WATUlUNE
-l:X-STU- "S'RlR~SE\\ERUNE
"'-"'''J-/ "2'COOTWR
....-~............. _lo'CONTOUR
6. AU.W,IDlIAlS TO BE Rfl,(OVEll SllAll BE DfSPOSED OFf" BY CON1RAClOR llF SlTE IN ACCORllANCEI\\THSiA1E,
lOCAl ANO fiJl[RAlREGll.l,11ONS.
7. IDIPORARYSTalAGESPACE TDBE DEHlEDAFlERAll SlTEDE:MOlITlONi\NORE:MoVAlISCOIJ:PlDEO.
8.I\l.lCONSTRUCTIDNSHAllCONfORUIDlHtI.<<lSTCURRENlED/TIONOFlHEI!INNtSOTADU'/iRTI,(ENlOF
iRANSPORTATlOH"SlMltlAAOSPEClFlCA1'(lNFOR COHSTRl.IC1lON".
S.CARE:MUSTBE:TIJ<ENOlJRlNCCONSTRLX:llONIiNOEXCAW.iIONTOPROTECTANtSUR\lD'MONUMEHlSmO!OR
PROPEmYIRONS.
10. PUBU~ 1'IORKS pEJlI,lrr I.Pf'l.lCATlON FOR WORK Wm1IN RO.W IS REO\IIRED PRIOR TO RE:MOV..... OR IllSlAllATION OF
COfICREI[DRI'IEWAYAND~UR8,I~TIONOFSlDEWAl.K/B[\(U'ATfl.OR01lOWORXMTHIN1HJ:PlJBU~R.O.W.
PRELIMINARY
FO R REVIEW 0 NL Y
0' 25' 50'
1"""'----
100'
PREPARED FOR:
~
"
~~
~v
fi~~o
::> ~..;..-<
o::3:~~
-<,,-,-,v
Uf-<.....ono
f::~'"'::::l
u;I ZPl::g
'" '"~Z..
-'0 0><
~H;? s:;S
REGISTRATION.
I hereby rertifytl10tlhis
pilln,specir.calion,or
reportwospreporedby
me or uncler my direct
supervision, and that I
om <:I du~ Registered
Landscope Architect
underlhe lows oflhe
stote af Minnesolc.
.
"^"~-
,-..--
05.07.07
15144
--
~u
~~-t
..]
H~
;;
l
I
I
,
,
i
!
,
,
,
.
,
!
I
,
!
.
,
,
l
!
!
i
I
,
I
I
,
,
,
!
,
,
l
"
~
~~
..
""
g::c:
~~
~~
REVISION$:
ND.: Dare: ltom:
L.. 05.ll'r/il crrvSlJBlIllTTAl
~
Z ~
t:2Z~:g
~o~g
P-<til~~
c5 ~ ~~
i E=:CI) ~ ~~
i~~!;;51
i....l E-< ~Ni.
~ ~ 0 09'
i U ~ ~<i
~
o
~
o
S
~
o
u
o
z
~j
~'"
o
,
1
o
!
,
!
,
!
,
.
,
150' ~
I ~
PIO,B:INo: 06101
-.,. MLS
~.,. AAK
- 05.03.Q7
~ -
e1.l
! J
td: - ______________u_______u_n
.-----------, I IJ ''''"= "''' -
\1
J !
I' I
I I!
,I ~
I I.
: i
II
It;; I
I~ I
,0 I
<5
I~ I
10 '
________J~_
GENERAL NOlES
):IUGHT I
I
I
/-1.....
,
\ I
: I 0
\ I
: I"
\ I
: I
I
I
I
I
I
\ ',-,;,-
,
\ \ \
\
\ \"
, "-
" _ ~':s..:= ~_~ - -
~ ~~m,^",
~ DlSlIHCRETMlIHGWAU.
~ GATEWAY COURT
'1;1i
,
,
\
\
\
\
\
1
1
1
1
./CCtlooQ
,
l.CONlRACTOllSHI\U.CON'lAcr"GOPHERSTATEOHECIIll',l'MlB1!S!;ESSIlAYSPRlORTOD:CAVJ..llDNANO!OO
CilIISmuCllOO, roo UllUTY LOCAllotlS. 11\IN CIllES ~E1RO"'REX 651.4M.DOO2: TOLL-FREE: 8OO.25:!-1165; OR O~NE
AT:WWlI'.GOl'HERSTAlWNECAlLOOG
2-TI1ESHOJlfllOCAlIONOfEllJSllNCUNOERGROWOUTllJllESlSANAPPROXlum:lOCAllDNDNLYA,NOHA\'ENOTBEEH
INDEPfNDDHLYI'ERlFlEO. TIlE EXACT lOCAllON OF.Ill.lJ1lUllES UUST BE VERIflEI) PRIOR TO COIll.!ENt:PjC WORK.
CONlRI>.CTllRSHI.lLAElDI'ERlFYTHELOCAllONSANOEl.[VAllONSOfEXlSlINGUWTIESANOTQPOGRAPHICfV.TIJRES
PRI(R 10 START OF SIlE D:CAVAllON. lHECONTRACTOOSHIIU.lUr.IEDIATI1TNOllFY1HEPRO.ECTENGlf/EER()f oINY
OrstRrPANt:lESORVAR~T1ot1SFROI.I PlAIl.
:l. lIIECONlRACTOllAGRffSTOBEF'Ull.TRESPCtlSlBlEFOR ANY I.ND AliOAMA(;[S WICl:i UIGHl8EOCCASlONED BY
THEFAlLIJREOfiHEtomilAC1ORTOoo.CllYlOCII1EANOPRESERYEANYMlOI\lLUNDERGROONDUllLJ1lrs.
4. EXiS1WG SURlOlIlFORloIAllOO PRO'IlDEDBYLOTSlJRI'E)'SCOUPANY. OIsrnG 1UPOGRAP~ClNFORUAllON PROVIDED
BYLOTSURVE'l$CCt.!PANY_PROl'ERRAOCSlGNASSOOATES,INC.SIlIlUNOTIlERESPONSlBlIfOflMACCURACYOf
IIlftllMAllONI'RO'IIDEllSVLOTSUR\OSCOMPANYCONCERIIINCEXlSllNGINfORMAllCtt
5. EXlSlINCUTll.I1YAS-BUILTINfORMAllONPRO\\DEllBYClTYrJ;AROEN HillS. PROlIRRAOCSlGNI\SSOCLATES,lNC.
SHill NOT BE RESPONSI8l.E FOll THE ACCURACY OF INFORMAllON PRO'VIOCD BY THE CITY OF A1IOEN HIllS CONCERN~G
PS--BUIlTINmRMATIOIl.
6.illMAIDlIALSTOSEREMOI'EDSHAl.t.aE DlSPOSED OfT BY CONlRACTOfl tF SiTE IN ACCORDANCE\\HH STAlL
lOCALANDFIDrnALREGULATlON5.
,. lEl!PORAR'(STORACE SPACE lOBE DEFIIlED AflERAllSlTEOD.IOIJTlON ANO REMOVALISCOIoIPIDFJl_
B.Al1COrmRUCTlONSfW.I.CONfORMIOTHEI.!DSTCURRrNTEDffiONOFTHEI.!INNESOTAOEPARTloIENTOF
TfWlSPORTATION"STANOARDSPfClFlCllTIONFOR CONSTRIJC1iON..
9. CARE MUST BE T/iKEII D[)!lING CONSIRUc:noN ANOEXCIlW.TIONlO PROTl:CT/offlSURl/E'l" MONUMENlS AND/OR
PROPEFm" IRONS.
10. PUBl.IC WORKS PER\.IIT lIPPIJeATlClN FOR WORK IWTHlN R.O.W ~ REOUIRED PRIOR TO REMOVAL OR INSTAllATION OF
cctlCRrn DRNEWAYA/Iil CURB. INSTAIlAllON Of SMI'Im/BIHEPAlH, OR OTIiER WORK WIlHINTHE PU8UC R.O.W.
11. sourH CURB SfW.LTlPOUllOW/IRIlSTHE NOlml.
OI'ERHmG
OVERflANG
O\'EP.~"'G
O"'P.~^NG
BUll DIN G
HEAWG&
A/CtIllITS
-i-
m"''''~'''lj
0lli:~,!~;13
.;~"'~c::~~
,
.
,
-,-
~
~
~
~
"'=
D:LSTlNG
~
L___
"\
/
!i"
LEGAL DESCRIPTION
SITE DATA
PIIRCEl.I:
THE SOlI1H JO ACRES OF THE NORlHWEST OUIIRTER Cf SECTlON21,TO'MlS!fP30, RANCE 23,EXCfJ'TTHE IlESTBB4
FUTTHEREOFAlIDEXCEPlTHEFOIJ.()lI!NG.
BEGINNING AT THE POINT ON THE SOIJTH LlNECfSAlD JO ACRES, 2ro:l.D FUTEllST OF THE SOUTH\\ESTCOONER
THEREOf; THENCE EAST TO lHE SOOlIIEASTCCIlm:R THEREOf; THENCE NORTH TO THE NOfITHEASTr:oRNER THEREOF;
THENCE\\E5TALONGlIlENOIlTHLlNECfSAIOJOACRESTOAPOINTl7BB.OFl:ITEASTOflltENORlHVr'ESTCOONER
1!IERECJ"; lHENCESOllTH2BOEGREIS41 MI!MtSEI\ST559.,FEET,MORECRLESS, TOlHl: POINT OF BEGlNNlNo,
EXCEPTPARTDEIDf.DTOSTAl!(S"MINNESOTAINBOOK"1729'RCR,PAGE9B8ANllBOOK '2!l:l3'RCR,PACE528:
PIIRCEl.2:
THATPARTOFTHl:roJTHJOACRESOFTHfSOUTlIHALFOFTHl:NORllIWESTOUARTERCfSECll~21,TOWNSf!IPJO
NORlH.RA!lGE23l\EST,RAMSEl"COUNTY,UINHESOTA,OESCRI8f.DASFOllllllS:
BEClNNlNG AT A POINT 00 A UNE RUN PARAU.E!. IIlTH A!lDOlSTANT:l3FEETEASl!Rl~orU~l OESCRlBEllBELOW,
OlSTA!lT200FEETNORIHERLYorITSINTEIlSECTlONlfllHTHEEASTANOVlESTOUAATERUNl:OFSAlOSECll~21;
IHENcrRUN SOOTHEASTERlY 10 A ProITON SAID EAST AND VlESTOOARTER UNE. DISTANT 220 FUT[ASTERLYOF
SllIOINTERSECTlON; THENCl RUN Vr'ES1!RLYALONGSNOtASTANDll[STOUIIRTER lJIlE FOR H1.92 FEET; rnENCE
DEfLECT TO IHERIGHl 011 A NOH-TANGENTIAt. CURIL CCJlCAYETUTHENORTHEAST,HA'-INGAOELTAANGU Of 5,
OEGllEES 43 Mil/lITES 04, SECOND5. A lWlIUS OF 167 Fl:IT AND A CHOOD /.2lUUTH Cf"~:\S IlEGlEIS O:l MINIITES 5\
SECONOS,FOR 168.23 fEET, MORECflUSS,TOANlN1ERS[CTlONIIlTHSAIO:l3FOOTP/lRALLElUNE; THENCE RUN
NCflIHERLYONSAlO3:lFCOTPARAllELUflEFOR52.2BFEETTOlHEPOIm-OFBEGlNNlNG;
UNE1: BEGlNNlNGATAPONTOIllH[NORTH~ECfSAI[lSECTIONzt,D!STANT11BOFEETEI\STOfIHE
HIllTH\\EST OOlNER THEREOF; 1HENCE RUN SOJIHERLY AT AN ANCLE:OF,50EGREES2B MINUTES 41 SECOODSFRCJ.I
SAlDNORTHSECTlCtlUNE(MEASUREDfRONWESTTOSOOTH)FOflll05.99rEET;nalCEOEFLECTTOTHfLHTATAN
ANGtE OF 17 oreREES 04 MlNlIl!S 1:l SEGOHOS FOR lB7.08 FEET; THENctOEFLECTTUTHE RlCllT ON AN 00 DEGREE
44 I.lINIlTES 14 SECOND CURI'E (DELTA ANGU 07 OEGIlE!:S 08 IIlRUTES:l3 SECONDS) FOR9B8.91 FEET; THrNCE ON A
TANGENTTOSAIOCIJlM:FORliOOFEETANDTHERETERMINAWG.TOGElHER\l\lHlHATPARTCf"THESOUlHJOACRES
OFTHESOIJTHHALFOFlHENCIlTll\\ESTOUIlRlEROFSECllON2I,TOimSl:ilP:lONORTH,RANGE2:lWEST,RAMSEY
GOONTY,MINIlESOTAOESCRIBEDASFOlUlWS:
FROI.I APClNTON UNE1 !lESOlIBED ABO\(, otSTANT 499.5:l FEETNCIl'TH OF ITS POINT OF TERMlNATlOH RUN EASTERLY
ATRIIlHTANGLES TOSND UNE 1 FOR 33 FEET TO 1IlEPOINTOFBfGlNNING; THrNCfCONllNUl: EASTERLY ON THl: LAST
DESCRIBED GOURSEFOIl 33rEET; lHENCERUN NORlHERLYPARAUEL'OIlH SAIOUNt 1 FOIl170.5:lFEET,MCllEOR
USS,TOlHENORlHUflEOFSAlOSOllTHJOACFlES; lHENCE RUN Vr'ESTON SAID NORTH UNE TO ITS INTERSECTION
'OITH AUNERUHPIlRALLELYIIlHAIlDOISTANT33 FEET EAST OF SAID UNE I; lHrnCERUN SOIJTHOOSN03:lFQOT
PARAllELUNEFCIlT6,.76FUT,1l0RE ORLES5. 10 lHl: POINT OF lIEGlNNlNG
G_BGA'rIWAYBU5IHESSOISTIUCT
-
""""-
~~.
fROIlTYAIlO
SlOEYIIRO{II/TERICl!)
""',..
lMESIlCl'lE(H1GlWATERliIIRK)
PARKING"
-,
Sll)[YIIRO(INIDlIOR)
'"~~
PROPOSED (FOll A DISTANCE I)' :l22.~O n.)
""',..
lAKESHCl'lE{H1Gl WATER MAAK)
"TilESl'SETIIAO:SI!A~BEAOJ.I>TED\lYTil:lJlY~MPRo.ECT1lE\\..""PROCESS
FlI€CiiANG[S\\IlJ.IlOR[EITl'Cll\lE1YACCOIM\JSIllHESTmSPURPOSEOFMG-BDlSiRlCT.
<;H0RFlJ.//t) ~FlllnF/Fl.lf"NTI;
Ra,iNDlME(02-70):RECllEIITlONALOE\lELOPMENTlAKE
"'"'
S[lB~CXS
UlNIMWfROI.lOOIl
UlNIJ.IUI! fROI.l STREETS
~IJ(I~W HEIGHT
LOTaJ\lERAGE
.-.
..""
""-"'"
l.Il'EIrnOUSSURFACE
.~,
PA\D.IEIlT
SUBT01AL(PROPOSWLOTCO'IERAGE)
LOiCO'IERAGEAUO\IEtI
~OOSSURFAC:E
ro,.
NOTDEFlNEDING-BDlSllllGT
~2e.t2l SF. 7.~ AC. 6B.1l%
154,B175.F. ~.~ AC. ,,~
1KJ04SF. 4.00AC. 36.0lI:
329.121S.F. 7.55AC. ,,~
31S.5S8SF. 7.'llAC- ,,~
15IS.I8S.F. 3Jl3AC- ,,~
4B1.059S.F. 1\.1BAC- l00,OlI:
tS4,B175.F, :!.~At ,,~
146.1l7S.F. :!.:J5At 3O,0~
..
.,
..
flOOR A~A ~'lln
-,
I!A~~UM ALiOl\ED FOR 0!Il: STalY BIJUlIHG
""'"
D:ISTl1lGSPACES
PROPOSEDSPAOCS
REQIlIREDSPAOCS
."
o
"
..
o
~
7
" ~
&~ lIi
OWNER
"".
""
;lOfT.
75fT.
IIROENHlllSlNOUSTRlAL,llC.CjoUNlTEDPROI'ERTlES
TOODHAIISON/ANITA'VIElH
JSOOMlERICANBOOUUVIIRO'l1EST,SUllt200
BLOCMNGTOO. IlN .ss~~l
PH: 952.631.1000 fX:952.lI2O.Bn7
APPUCANT
=,,~
CHIIRLESPATTERSOO
4JOO Wi:ST ROUNO LAKE ROAD
AROENHlllS,/.INSSI12
PH: 65t60U9~4 fX: ~1.604,.24tO
""
m"
'"
;lOfT.
W"
ENGINEERlLANDSCAPE ARCIDTECf
PROTERRAOESIGNASSOClAltS,INC.
GllEGOR'I'O.I!ORlS/AlAAKRffilAN
,JOOHUDSONBiW.SlJITE220
OAI<OIJ.E.I!N$Sl28
PH:551.139.BU1FX:S5\.ns.oB4S
75fT.
"".
""
SURVEYOR
LOT SURItYS CO~PANY
7601 73RO AVE. NORTH
BROOI(l'l'NPARKMN55-(2B.
PH: 763.S60,:lO!l~ FX: 7S:l.560.:lill
PRELIMINARY
FOR REVIEW ONLY
0' 25' 50'
.----
100'
PREPARED FOR:
~
~~
~7
~~~o
o h..,;.....
Ot3(Sr:!i
.,,"'-,-,7
Uf-<Ea:B~
e:~Zh;;;
~o'"~~~
,"0 0:::1
U~ p.,J.r.
REGISTRATION;
I hereby certify lno\ this
pton,sf>l"cificotion,or
reportwcsprepcredby
me or under my direct
.upervi.ion.oodlhell
em 0 duly Registered
Londscop.cArchitecl
""derthe 10Yls 01 the
stoteofMinnesolo.
-
'"-" ~ ><Rrow<
,-..........-
- 05.07.07
15144
--
I
I
!
I
I
,
,
,
,
;
!
i
,
I
!
!
!
,
i
i
I
,
!
I
i
,
i
I
!
l
~
~;
~:
REVISIONS,
No.: Dale: 1tMl:
L~('.nvSuaMlTTAl.
j
ll<
dZ N 5
~ 0
~ ~~ ~
:<5iile: ..l
~ t;j ~I ~
c5~~:l ><
i E=: ~~:J ~
Hg~l;;S: ~
i....:l E-<~ffi::1
;~009i ~
EU~~<ig:
o
,
!
o
i
I
i
!
i
,
T50,g
, !
-~ 06101
-'" MLS
~'" AAK
- 05.03.07
~ -
C2.1
....._- . 't',' ,
! \ ",;;.......-....., \11\ J
\ '" I -' ___. \ li'.\ /
I \ _ ". '''.' _ - ~1:_Uid ('- ?~ ) \\:.:..\\
- t~d@)P ; - -!~ -~; .~f~~~~---~~~i&~~-~;~~~i~~?~-:;-:-=--:~==~=~J~~_:--~=----~~~g=:-------~~;\~~~\ '\
\ I 6>t~ ;;:;c \\" " \ \
I I ~ \\\'\,\ ,\
I I \.\.\'-, \ i
I / \(~'~.,:-,\\ \ \. \
i i!@\\\'-\",:\:"'.
~2ii !1M."" ~'g.S4 \'-\\\.'" ..... "-
\\\\..... '_-'~---....-'j
\;.:<:\--..... --1 i \
..;,--..... \' , I i \
"', -", " 11, \ \
G/i?Ofi. ,09_54 ;)\i \ \
!/c.l 1 j! I \ \
",'II! ! \
\,' i 'I \ \
\i, I J \
\ \ " '. ~ ~ \
\'\\'\. '\'
\ \,-,,,,, '
\\'~.;,\ \
'\.,""\" '.
"\.~ <'\\ '\ \ \
J\::.~.~S,S~>\ \\
';~'~::~~ \, \.
"" sM@5~~I\ \ '.
~~-' r\\\~ \ \ \
gGI '\""'~ili" ',,'
I ,\'\\, ,,\
,'\\." \
I ;,\\\\1 ill \
I I \\,; \ I r ~ "
r \ ll;il II \\, \
I VI,'I!I\ \~II
\ I ,'li) \ \.
...../ / II: \ '. I,
9(;.5:' C'i'.XJ /il \ i "
C/C1 J \ \ \ ~- 1
i I '. I) /\ '.
II (/ \\'-\
I ! I " "-
I I I " If,,
". .J<C~~i II \\ ''\
SIr'!; /;. I l I / I' '!h \ \..
_ _ :....-.-1.\\( / If" "\ ~
- - - - - -.., \ \ \ / \ '\> ' ,
- -- -----. \\\,,\\\, ~ ' "" "
:.::--------=----, '~\\\\..,',''''-?, , " ",
g,::....:..==...-- -~---- - ~,-,~----=:.....- -,- ----"-- -----~-
... .,..- _ -, ' ,_' ", \. '..~..$'J.,....., , ..-"""
,/ -: -, ,\\' ,''1'''0:. ....-.:~.:::-~_ ....., "'-,
924' ' \. \ \ \, ,'>$~ '__.... -....:--.'::"_..... ' .......
\ \. 12- _~ I!; ..,,/!:'''--.::.::'''::.......:<...-.....::-, "" '""
\ .-...2 - .,..IIi <:-.... ))).; / I .......,
w~ \..._~~__:// /:...-<.:;:;.;;,/,:,/.' ""'"
, ,
'.
II
,I
g97.~j., ..
i
,~"'"
..
PROl[GlUlN
~.
Rm.Aee:l0Cll.1'iIS.
RlI'RAPI.NDFllllJl
fMllllCIJNDERlAYllOlT
CONTRAClORSHAl.LIlUD<OlIlBOTHPINIS
f'[IllliEPROPOSEIl(;lAllallUCl:ANDANYOlHElt
IlAlUlIlJ..SEXCAVAmlSHIII.lBEcor.IETHEGONlRACllXlS
ANDSHIII.lBEPROPERLYDlSPOSED(Flfl'~sm.
n i
~j):I\
I / \
I 1\ I
WI \;
'0 ~ \
~ \ \~ i
I~ ,Ir~/,'
11 i \
____n__j:
/",..~ G.~.'
o
REl'LAC[lDCll.1'iIS.
RIP RAP AlfIl ALlrn
fABRICUIDERLAYllEIIT
-",-
PL.ACl:RO(:l(ll)[;
AT IKI'/III SlRWl
,_CATOi8A!'lNS
,
,
,
.~
"""'"~~
.,.".
-l:XlSIl~RETAININGI'IAIJ.
[Tv]:;:; -st---
'--01:
GATEWAY qbURT
G/i.'!
I
Bj,~fr
,
,
GENERAL NOTES
GENERAL NOTES
1. CONTRACTOR SHAll CCJf1ACT"oo>HERSTAlEONi:CAll." TWO w.;INESSPAYSPRIlJlTO D:CAVATlONI.ND!OO
CONSTmICl1ctl, fOR UTIUTYLOCJIll<>>ls" m~ (]TIES Ili:1RO AREA: 651.454.0002: TOLl-FREE: 800.252..1166; OR ON-U~E AT:
\l1IW.GoPHffiSTA1EONEOil.OOS
2. THE SHOWN LOCA1l(Jl CF txr.illNG UNOEllGlWHD II11L1]ES IS AN APPllCOOMA1E LOCA1l(Jl CtlLY AND HAil!: ~OT BEE~
INOEPENDENTLY I'EFlflED. THE EXACT lOCATlO~ OF All unuTlES ~usr BE VERiFEP PRIOR TO COWIENOtIG lIORK. CON'lRAClOR
SHAllAELDVERlfYMLDCllTllWSANOEl.EVATlOIlSIT[)JSTIIlGU]UTlESAIIlTOPOGRAPHlCFEAlURESPRIORTOSTARTCl'
S1Tf E);CAVAll(rl_THE CllN1IlACTOFl SHAll IMMEO!AlELYN01lrY TIlE PROJ:CT ENGlIillR OF IJIYOIStllEl'ANClES OR VARIATIONS
-~,
n. All EXCESS-~ATEl'IIAL. SI1IMIllOLlS SURfACING, CONCRE1E 11UI5. /oJf'I ASANOCtIED U]UTY 1Tn<S. AND OTHER U~STI&.E
MAnRlIllSINClUIlINGCLfARED&:GRUa8EDIlATEl'IIAl.S.SHALlIll'COME"MI'ROPERTYOFlliEcc;;TRACTOFlANDSHAllSE
OIS1'OSElI OF en THE COOSTllUC](IN SITE \11TH ~O C(J,IPENSATlOIl FU! IWoIOVAl.. I.IM.ESS DTllERlIlSE SPi:ClFIED.
12. All FIll AREAS SHAllHA'itIilLORSl.NICIlATEllW.REMOVED PRIOOTOfUlNG.ALLFlU.MA1ERIALSHALlIltUEANNCtl
ORGANlCBORIlOWMAlERlALPlAQllIN1B"UFTSCOllPACTEDTOIOImSTANOAflOPllOCTOR,VERlFlCAllON(I"lHIS
REQ\lll6lENIBYAlHIRDPAIlTYGE01ECfIlllCIJ..ENG\l!EERSHAllBECOCflDINATEDAlfIlP/JOf0R8YTHEOONrnACTOR
llHENEVrn A SCllSllEF'OOT ANO A Sl1S1ESTINGSQIElXU IS NOT SPECffD.
13.PllOPOSEDSPOlEl.EVATlOI!SI.NDC0N101JllSARtTOTtI'OFGAADt,PAvD.IDlT0Rr.JTTEllUNE.UNL,SSOTllERMSE
Sl'ECIFIED.PRa>OSEDSPOTELEVATlctlSIJ..ctlGCUIl8AAETOflOWUNE(Fl.).
I!. CON"lRAClOR SH~llINSTALl, NSPl'CT, MAlNTAN AND REllOl'i:THE N,CESSARYSlGNI\SE FM LANE CLDSURES.AlllRN'FlC
CONTRClOE\IICESANDSlGNING!<lAltCONFORIITOIoINDOTAlfIl~THEClTYOFARDENHlllSIDll'ORAIlYTRAFIlCGOOlRCl
~-~
1~ COf'I1RACTOfI SHALl N01lrY THE CITY OF AAIlEN HIlS. puauc \IlalKS DEPAAlIlENT. 4!l HOORS IN AIlVANCE IT WORKING
l\\'lHIN THE RIGHi IT Y/AY. CITY IT ARlltN HILJ.S INSPECTORS ~usr teSER\lE All!ll)lll( COtJPIIlUl, IllClUDIllG TIlE R!:MOVAL
CFE):lS]NGCllR8&Q1TiER,[XCAVATlON Of TRENCHES, PUCEWENT Of STOOIoI DRIJII.CCNIOCllCtlSTOEXlSTINSUTlurY
lINES, BACP:AWNG AId) REPLACDIOO OF BffiJlII~OUS PAInIENT ANO/OR CONCRElE CUIlB AId) r.J1TcR.
16.AllGOOST1lUClIO!lMUSTC(I.IPLYWl1HClTYENGlNErRSASSOOATlOIIOfIlI~TA(CEAM).
17.CAJlEl.llISTllEiAKEN~GCPNS1Il\ICTlONANDEXCAVAllOllTOPR01ECTI.NYSI.IRVU'MONUWENTSANO!Ofll'llC\OERTY
'"~
Ill.COHTIIAC1ORSHIJ.lBESClRYRESPCtISlEllTOREP.Im I.NY AND All OAllAI3E TO EliSTING STJlUCTI!RI;S, Rn/JNIllGW/JlS
AND ExISTING S1lEFrATURES DUE 10 ctI!SlRUCTlON AC1I\II1\i:S.
19.CON1RACTORSHAllPRO\IIOEASIoIOOTHIINDTHOROO~TRI>NSIllC>>l1lEll\UN1'ROI'0SE051lISRMlESANDDRAlNAGE
WAYSAND~GSlJRROI.INDlNGSl1EI;lW)ESI.NDDR/JIlASEWA1'S.
3. THE a>>l1RA[;1(JR AGREES TO BE FlJLl.Y RESPatSlBl.E FOIl ANY I.NO AU PALlACES lIHICIi ~IGHT BE =sfQNED BY TIE
F^lIJRl"OFlliEa>>llRACTORTOEXAGn.YlOCA1E:ANlPRESERVEANYANDAlllRlIlERGRl)J~OU]UTll'S
4.EXIS1INSSURIt1'INFDRI.IATlONPRO\IIDEDBYlOTSIAl~JlC"ExlS1INS1(1'OGRAPHiGINFlBIATlONPRO\IIDEDBY~OT
SUIlVEYS,ING..PllOTERRADESlGllASSOClATES.INc.SHmNOTBERESPONSlEllFORTllEACClIflACYOFIWORll^TlON
I'RO\llllITlBYLOlSUR\!:YS.ING.CONCERHINSDlSTtlCINFOOWlllON.
GRADiNG NOTES
I. ~TAElE{;R.IJJINGIlATEllIALSHAllCONSlSTOF III.lSClLENCCWllJlEP ON THE SITE iIITHEX(:(PTION~1OJ>501l..DEf!RIS.
CIlGANlC ~A1EIllAI. AND 0lHER UNSTA\IlE MAlERIAL.
:LSUBGIlADEEXCAVA1IONSHALLBEBACIOlUIDIMMEPlAlELYAflIIlEXCAVAlI(JlTOIlEl.POITSE1ANYSTAElUlYPROOCD.lS
DUE1DWmRSW'AOEOOS1EEPSlcP(S.\\'HENPl.AQ~NEW!>JRFACi:ru.TEllIAlI\D.WDlTTOEXlSTlNGPA\l!:llENTOR
C(Jl=CURa,1HE(XCAVAnOllSHALiIll'BlD:AllIDPllOl.lPTLYTOAVClDUNOrnIollNINGITTHEEXlS]NSPA\IElIENTOR
~~-
J.CI:IITRAClOR9iAU.INSTAllAlLEROSlONCONlRtlllEISJRES/oSPERNPDES&llI'CAGIJlI)EUNES,PRIORTO
COUl.lENCD.IENi Of GIlADINC OPERIIllONS AND ~AlNTAIN UNll. AU. AREAS IJ..lERED ON 1HE SITE HAVE BEEN RESTIHD.
~_~SHALLPlACEEROSlONOONTRCIlMEASlJRESAACONDAt.l.CIITCHBASlNS.REESTABUSHGROLINOCO\ERAS
so:J.I AS POSSIBLE BUT AT A MlIIMJ~ (I" l'IIO \\ID(S AflER IJRAlllNG. J.S CO/IlXlKJlS PERW1, liTH SCO 00 SWlJNG AND
EROSION COHlIlIl- aANKET Pt~ ANrnOREII AS PEIl SIR'PLIDlS REOI..IIlEMEN1S-
2Il.f~OJSTINGTREES\\HEIlEPOSSl8LrANDIOOYl\\THPR{l.(CTL/l.NDSCIIPE/J!OlIlECTPRlClRTDREMQVAL
21.ALlCOOSIRUCTlONSHAllCCtlfOlll,(TOMINNESQYA!S'ARThlENTOfTI/ANSPORTA]OO"STANDARDSPi:DilCATlONfCl'l
OONSTlllJC]{>>(,2000rnmON.
22.AllCUllllANOGUTTEllSHA.U.BECONCRElIB611UNlESOTHERlllSESPEOFlED.SEEotr/JL
l:I.AllDlllENSlONSTOfACEOfCURBUNLESSOTHERIIISESPi:OFEl.
2'.lIIllmDJllDlSlOIlSSHAllPREVAlLOVERSCALrPDlMOISlONS-
s. OONSTRUCnoN ENlIlAllCES SHAltB!' S1JRFACED /JIll REPLACED AS ~EIDfJ)l\\TH I-l;r cu:AR RCICI: ^CftOSSl'llLl'l1lDTH.
FROI.IDfTIlI.NCEPOIllTlOFFTYFIDIIIl'HINPllOPERTYUlltREFU/TOROCKCC!iSTIIUCTlONENTIIANti'llElAm.FOO
INSTAU;,llCPll&MAlNlENANCl:PllOCEllURE:5.
6. CONTRACTOR SHAll PRDilllJ: A MIIII~U~ FOOR 1N0i DEPTH OF TOPSllllO Al.L AREAS DISTURBED. TO BE SEEDED.
7. CONlRACTORSHAllBERESf'OOSELIFDRAllHGmONiAlANDVERlICALCOIlTROlONCETHEAlRIMD>lTHASBEEN
ESTAI3USHEDIHTHEFWlBYTHESURVEYllFtTHETlI/i:ANDMAIDlIAlSCOSTlmoCIl\9llOREPLAa:THEA8O\ES/JO
C(JlTRClUllBETHE RESI'DNSIBJUTYOF TIf: CONTRACTOR.
a_GIlAllrSSHOWNAREANlSI-al(JlWlES.COHlJUI,CTDIlSHAllROUG1G1lAOClOSllBGIlAll!'ELEVATI~.lfAIl!:STRETIREAOY
FOIl SUB-BASt. STllCKPILElO'SOll AlfIlGRI.NUlAA nll AT lOCATlctlS OlRi:CTED BTENGMIIt
9_CONTIlACrOflSHIll.LBESOLElYRESI'~SlBl.EFMANYI.NOAI.L/oPPlJCABLITES1INGfOOSOIl.DENSlllES!ltrIDTYTESTlNG
AS PER THE GOVERIlING AGENCIES TO ~ErT 00 EXCEEilTHE REOUIREtl OODELtN""oS FOR 1ESTIIlG, IIITH NO AOPmONAl
COOII'l:NSl.llON ~AOC
1D.lIlESPEClFIEPDENSlrYMElHOOSHAU.BEREOUlREDfORALlPOR1IOOSlI"PERl.IANENTC(JlSTll\lC1lCttSTI.NPARO
CCUJ>AC]ONSHAUBERBlUIREllFORI.NYTEMPOIlARYCOI'fSTIlUC]ON.
flI':ST
~!O.OS
n()~
EXISTlNS
,,or.:'
9;J9.0."
o/L
,
,
,
.
/UATCllD:lSfflG
~
"
,
G.T"
~
.,
\;:, %:.
,
CONSTRUCTION SEQUENCE
IEGEND
I. GONlRAC1OR SHAll VERIFY THE RECElPi Of 1HE NPDES ANll THESIIPPP PrnurTFROll THE I.IPCAI'RIOO TD AllY SITE
D1STURBI.NCE.
2.IllSTAU.ROO:GONSiRU~ENTIIANCE(SU:OET/JL~
:l.lIISTALlPER'lDERSl.1FrNCEANllOTHEREROSIIlICONTIIOL~ASURESPERTHES'M'PPI'LlN_IXfJTRACTOI!SHALlHAIl!:
AU. EROSI(ll COOll<<X.MEl\SURES INSPECTED BY THE ClTY ENClNWlPlllOll TO AII'f GRA[lfIlG ACTlI'ITIES-
~. BEGl~ TIlE[ CLEARING &; QMISING.
S-BEGlNSlTEEAlllHWORK
~_PElWANENTTURFrSTABlJSIflIOfOIS1lJRSEDSOIlSOIlSIiIANKMENTANDSIOESl.Cl'ESINACCQR[.\ANCEVI1THW~TE=
STANDARDS-
7. BEGIN UTlUTYOONSTRUC]ON.
B.COI.Il'L!1E:;IlIEAATHIIORK.
e.COMPlfTEUTlIJTYCONSll!IICTIOIl
lO.REIID\{AU.SlL1DEPOSlTSF1lOllSl1EI.NOllUlO\lEf0lI~SlLTrrNClNCANOCllEI;KOIJ.lSUNlNA~ALACCEPTANCE
IT THE PllMCT.
11. S1JElJ,IIl NOTICE OF lrnMIHA1\OII1O lliE ~PCA, PER MPCJ\ GUllJLt'iES. ONCE IXfJSTRUCl100 IS CtJ.IF'lElIllI.ND lHE S'M'I'P
REDIlIIID.IENTSHAVEBWlACfDEVEO.
TEMPIPERM SEDIMENT CONTROL SCHEDUlE:
-E'-SAN-
-r;;-ww-
_EX_STU_
..--,..>Jc../
...-...:,.J-.....
I.NOGAAOlNG!<lAllCOllMIJICEPRlOOTOTHElMf'Lfl.IEN1ATlONOF1HENPIlES~rrAlfllTHES'l1'I'PPERlIIl_
2.All\\tIRKSIlAll COlIPlYVI1TH THE GtIllELtlES SET fCllTHIN iIE MPCA'S PllOlIC]NS WATER WA!JTY II URBAN A!lEAS,
BEST ~ANASDlENT PRACTICES foo MINllES01A AlfIl THE LlS-EPA"S SlllmI WATER WANASUlOlT FOR CONSTRUCTION AC1II'I]ES,
I'UBtlSliEDBYTHEIlE1ROPillTANCOUNClLOA1EP2001.
:J.1HEIIIPROV<llEl/TSlNo.uDtDOOTHISPl.I.NAREPARiC1'THE1EIlPOIlARYAId)P8l>lI.NIXIERQSIIllGOIlTROLPLllN.
4.Sl1EMAfllENA/KtSHALlINClUDE,BUT/JIENOlIJIAITEDTO:REIoIQWIi;S1lEOESRIStICU.1lINGROIJ]I/i:SWEEPINSIF
STREElS, Cl.El.NlfIG 0lIl CATCH BASINS. AND DISPOSING ~A1ERlAL OFFSlTt
S.Dl!lrNGCONSTIIOC1IOO. TIIECONTII~CTOF!SHAllIllSPmTHEEN]RESlTEATLrASlONCEA\\ITI(ANDfOLlO'MNSI.NY
II[ASlJRABLERAlNFAU.ty[NTSFOF!S1~SOFrnOSlCllAld)S1LTING.NI'lES"'S\\PPf'GUlDELJNESSHALlBEMAIN1A1NEDTO
STABlUZl:THESlTfPERTHENPDES!<SWl'l'REroRElolENTS.
."
R
FXISllNG
~
.,
l~
lXJpp
o
.
'"
@
..
_SANlTARYSE\\\JlUIIIlHOLI
~ Hi'IlRANT
_GAlIVALVE
_?O\\!JlPOlI
_TEL.E?IIONEBOX
_STORMSEllrnMAHHDI..E
'" STORI.I SEWER C~jCH BASiN
I>
~ flARED mo SECTION
ESANlTAAYSEWEIlUNr
_WAlERUNE
_STOR!.lSEIIEflUNE
~ 2' ComOUR
_10'CON1"OIJR
o
Co
"
o
c
"=
\\\THIN2I1UKSCFCOOl'LrllCilOFSlTECIW.IING,
TOI'SOLSlIIIIJ.EESPREAllCilAltDlS'IURSIDAREAS
ITTHi:SlTEEXl1UDINGROAllWAYS_SEEDAllAIlE/iS
PER THE SWPPP PL>>I
"=
AllPROPOSrll PAIOIENTC(JlS1R\!CTlON SllIll.lBE
COI.l?lIlID USING lIPI'Rovm 1.l~1ERIALS, MrnIOCIS Cf'
PlJ\COIENT AND TESTiHG AS RECI.IlRi:O BY All
SOVEmNG !i'EClAC~TIONS OF THE OrY OF AllIIEN
HILlS me THESTA1E IF MMlESOTAOCf'ARTIeITOF
TIIANSI'CIlTATlON.
7
"
'"'
,I,
H
8
..
e
.
.
-,-
-I-
-~~-
~<"---""
~<"---""
PROPOSED
'"
~
_ SANI1ARY SEIlER ~ANHOlI
EfflllRANT
cGA1EVALVE
..
.m;
. "'"
~ STORI.l SEIIffi MANHOlI
"'STOflMSEWERCIITCHBI\SIN
~ STORI.I SEWEll v.tlR
_flAREDENDSECTlON
~ I1.ARED mo SECTION W!IllPllAP
~ SANITARY SEllER UNE
.WAlrnUNi:
_STIllI.lSE\\ERUI/i:
E2'CONlOUll
"lO'COI'/1OUR
PRELIMINARY
FOR REVIEW ONLY
0' 25' 50.
~--
100'
PREPARED FOR:
~
~~
~~
~~~O
~ ~..,;-
O~O;\
--t~,...)~~
0t;$:g~
e:~Z";;:
~o9~~
E3~<re~
REGISTRATION:
.Inerebycertilylholth;s
plon,speciflcation,Dr
reportwospreporedby
me or uooet my d;recl
supervision, ond that I
om 0 duly Registered
LondscopeArchitecl
underthelowsoflhe
state of ~innesoto.
-
AlAN A. KRErMAN
,-.......--
05.07.07
-
15144
-...
~i ~
~~f
:i:>i.s!
.. ,
i!
i
l
!
I
!
i
I
I
,
,
I
i
,
I
!
i
!
1
;
;
i
I
,
;
i
!
i
i
d:e
~lii
<Z
REVISIONS:
No.: 0IIle: 11011<
L~CfTYSUBMIlTAl
o
z ~
I;2Z~iii
~ 0"
<O"t>
P-< tij~~
C:;~~51
-p..,'"
j f;; X ~j
~~~t;iil
L-H"~ffi..
i ~ 0 g9!
l U ~ *<1
6
i'5z
~~
o~~
;><1Il;':)
~~<><
ZO..l
sg<<:o
~z~
..l~~
~Q8
.
;
I
,
o
1
1
I
g
,
.
i
,
!
,
,
t50' ~
, ~
I'P>P<tNo: 06101
DlDwnBy_ MLS
~" AAK
- 05.03.07
11> -
C3.1
, ,
fL_900-W
Fl 6999" WI'=OOB.l<
II>IV~9180 _ _. "_
r ' [X_\'ITM~EX_Wn.o----'----EX_\'.'Tl!_~Y_wTI.I_E>,_W'M_EX_WlU_~},_'I'M
pH'IOljAHT e
lIGHTr I
I I .-
, II I
I J1S1HyI
I ",IV.OOQJl
:/1 1
'1 ~':.BB~90 OFES-l
II nr....m.8D,1 IEQNJ;!l9O.J\
I I ~ \
\1 II
I' l:ll
,
I
I
,
'I
;i
,
~ I
.2 I e/" w
3<' 'If, "~S'lI.ICll.llll(~1
CATCH 8ASlN ;., I "~ I" I ,k ,~R_H41_A
~mHOlE ';' ">.;- 'I' OWll'!.lr9100
Fl~890.27 ~~' I I, I INVIN(H) 888.50
IH"(N).BBHl I! :---', l' INVOU1(N}888.50
:~ ~~l:=~~ I / " ~'1~2~ ~~5%
1NV(W}o880~2i '1,1 ~ ~RFES--3
I- - . ~CP ~ I~ 'Hc~ 1EllN):6~OO
~~_s,~ f:l 1 me? v-f9~:::::' '~~~46
""'" s: I ~.I' '"~.'" \ I' 0 0 ".'"'
IJ~ II \ \\\. _ ::iI' '::~NJ~ "~~
~ (, \ ~'" I~~~;~'
'" I~ \ "-~.''',,"-<'
.:3 I '\...1. \ ~~~~vc "
10 ~\ '5, \ SllR25 0-155l1: "
Z< ' "'i SlMCSI.!HJ(<I81 "-
1::1 0. I S' CASllNG~-&l-A "
o '~: I~V_6a7. 'w.oo~__~__
[l::' '" ';: W:~/IS8.40 IN (N)88Il.1O' ,
" "--, ~ '
--------- -- -- \':,.- ~- WETLAND
'~; I
~,~
\1 t
I II
U
f ,1
I: i I
,I J!
I: r i
""
o
PRFES-2
E(1N):B!l7.50
2OU.It" RCl'
o.J.SS~O-l:!.~
Sl\ICSllHl(4B)
t:,I.SllIlGR-434\-A
RE:Be3.00
INVIII (N) BB!I.90
lllVllIJ(N)8B!l.OO
~
..;IYVRANJ
11_8eiDl
l?A~:MII""'(,\lIO'"
MATERIALS
GENERAL NOTES
l.CONlRlCTOi!SH/IUCONTII;:l'OOPHERSTATEONECAlL",TlIOBUStlESSD.l.YSPRIDIlTOEXCAVATlONMtl!OIl
CONSIIUJ::IIJN, RlR U!ru1Y lOCI.1lONS. MR ernES I.IEIRO /<IlEA; 6~1.45.4.0002; TOLl.-FRU: 1lOO:l52-11BB; 011 OO-l~t AT:
Wlffl.GOl'HEPSrmONECllLORG
2-THESHllWN lOCA1Klt4OFD:I5IltIGUNIlERGROUNDUTlUTl:SlSMlAPPROllW,TE UlCAlJON OHlY MID III<VE Nor BEEN
INDEPrnOENTLYVERIFlED.lHE=l.OCA1IONOfAU.lJIILJTIESUUSTaEVERlAEDPRlDRTOCO~UrnClNGlIORII.COIllRllCTOfl
SIlW. FlEllI 'oUlFl' THE lJX:I.i100s MID El.IVAllONS OF EXlSI1NC lJIIIJT1ES M'O TOl'OOW'HI~ FEA1\JRES PRIOR TO STAAl OF
SITE Ext:llVIJt:lN. THE COtIIROC!OR sw.u. r.lMEDI>\TELY II011FYTHc 1'IlQ.W ENGINEER OF Nlf DiSCREPANCIES OR VAAll.TIOHS
_e~
3.1liECOHlRIIClORAGIlEESTOBEFUllYRcSPONSIBl.E:FOIlIHIA/lOI.U.!lWAGESIIHICIlUlGHlBEOCCA51OOElErl'THE
FAIl.UIlEOf1Ji[COf'{fRI.CJORTOow:tl.YlOCATEM'OPRESUMNlYM'OI.LLUND!RGROUNDUlUllES.
4.ExISIINGSlJRllEYIIll'ORW;r~PR\MDEDErl'LOTSlM\lEYS,IIC..ExIS!ltIGTOPOOIlAPHJCIh\"ORMl.llOI4PRCIIIlIEDB1'lOT
SURvEYS, IN('...PROTERRAllESIGNASSO(;lATES. II+::. SWUtlOT BE f![SpDtlSIBU:FOl!lIIEACCUR/oCYOF IllFORIlATlO/!PRovrOED
Erl'll1rsuRvEYS. INC. cotICEIlNIIIG EXISl1NG IIIFORW.UON.
UTIlITY NOTES
1.CONSrRlIC1IONOOfWliESfWlIl.ESURfACWWlllt1-1!Z"-Z"ClEARACliREGATEACROsSFUllWllllH.FROU
OIlRANCEPOMTTOFmru:rIlffilNPROPrnTrUNtREFERTOROCKCONSIllUClIONEIIllWICEDETlllFOflIUSf/IUAllOll
~~~
:!.CCffiRAC!ORSHAU.BJ:I'IESF'ONSIB1l:fDRAllHOlllZOOll.LlJ/Dl'ERlICALcomROlOOCE1IfEAlJGHMEIllHASBiBI
ESTAllUSHIDIIIMFElDll'r'THESUIlVEl'ORANOSHAU.IlCURAllcosrfORTHER<-ESrAlilJSHMOOOFso.I.lE.
3_ CONLRAr:lOll SHIIl1 BE SOlElY 1lI'SPOIlS&llI FOR I.IIY AND All APPUC~LE lBllIlG FOR SOIL OEllSllE & UllUTY 1ESlIRG
ASPERTHEOOIERNINGAGENClESTOUITlOl!EllCWlMRECUIIlEllGUlDWNElifOllTESTlNG.l\HHNOAOOlllOHAI.
COW'EIISIIllONMAllE.
4.AU.Ero:SSllAltRl/Il.BmJIDlOOSSURFACllo,CONOIHi:IlUl5, ANYABAN[)[Jffi)UllUTYIlEWS, AND OlHtFl UNSTAElli
~ATm.ILSIRClUDIliG~"'I;IlUlMVUA1ERw.s,SHAlI.BEC{),IElIIEPROPERTYOFTHl'CONLRACTOOAND5HAllfll'
DtSPOSEllOFCffTHl'cct!STRUCOOO!:llE\l\lIlNOCOl.lPEt!S/.1IOHF1lllREUOV/.!.,UlUSSOlllOO\1Sl:SPEClFlEtl.
5.PilOPOSEDsPOTEl.IVAn:JNSMIOCONTlltrRSAREIDTOPOFCRAOLPAVEllOOOOQJ11ERUNtWLESSOlllrnWrSE
_m
B. CONTRACTOI! SHAU.INSTAlL INSPECI, WIilNTAlN ANDREL<<JIE THE NECESSAAYSlGlAGE: rOO LME CUlSLIRES. All1lWT'lC
CON1HIX.O~CESANDSlt:NIRGSHIJ.lCOllFORllIDloIn1lO1MlO!OP.MClTYOFARDi:NHrU.SIDlPOOARrLRI.mCCONLROI.
GIJIOCUNES.
7_CON1R.OOOP.SKAllIlOTlFYMCITYOFAllllDIHillS. PlIBlIClIORKS DEPARTI.0IT.4aIlOURSIN/lDllNlCEOfI'lORKING
wrTHINMRIQIIOFilAY.0TY0FARtlENHIUSINSP[CIDRSWllSIOBSERVl:AllWOP.KCOUI'UJED.Illt:UlDllo1lli::REUOVAl.
OfEXISllNGCU!lB&mITlEIl.R<t.IOVILNIOREPl.ACO.ILmOFAREIIYDRI.IIl,EXCA'l/.TlDNOFTRENCIlJ;S.P\ACEIIENTOFSTOlW
DfWN, CONNEClIJNSTDExISIlltGlJIILJlYUNES.!l/lCKfJJJN.lM'O RO'I.ACOiliIT OF SllUMIIIOU$?AI'OIENT/Iffil/OR CONOO!
CURB ANll CUl1tR
8. All COOS1Rl!ClION ~UST CO~IU \\1ll' CITY i:NCI~EERS ASSOCIAOON OF MINN"..SOTA (ce.lU).
9. CAAE WUSl Si:1AKEN DURWGCOt!SlHLJ;IlONANO OXCl.VAi10RID PROlECfN-rr9JRvEr MOHUMEN15 AND/OR PROPDm"
-<
10_CONTAACTORSIII<I.I.ll!:SOlElYREliPONSlBL!TOREPAIllIHIANOAlltwAAGET08lISi1NGSlHUr:TlJRES.RITMNINGW.ollS
A~O EXIS1llG SITE ITAnIRES DUE 70 CONSTilIXlION I.CTMTlES.
11. COIIIR/IOllRSIIIil1u.u1frMNAlIIlIMUl.I OfB.Oru:r COVER cm:RTOP OFIJ.lFllOf'OSEilWA1!:RUAlN.
CATCH BASI~
Fl_eOO73
IIN_1lIJ9:lOt
INvaa907W
ExlS1ING RnmfIG W/JJ.
SAN WJN(D--181
~~o
IIAlERWlN
WA1ERI4Il~ FlmNGS
-~
-
WATER SERVICES
CATCIlBAsm
fl_9D2.7:J
I~V:B9~.13\'1
IN"~a92.l6i:
UANH.~E.
CA1CHSI.!>lH-
FLn907_92
(1._,5""-
,
i
,
I
~L- -f.
-- J -11-\-------
! I
I ~~:~,,= j ~ Hi1)RIJH
S.DUCTlLEIROHPIPE=ULES2(aFTBUm')
6" OUCTU limN PIPE SCHElllILI 52
CONSTRUCTION SEQUENCE
1.COmRAl;TOP.SfWJ..V'"dlIFYll'ERECElPlOFllENPOESPERMITl'IK'IlHEUPO.PRlORlOJoN'fSITEOiSTIJRBANCL
2- i5l1.LL ROCK CONSJRiJCTlOH EKTlWlCI: (SEE ocrM.).
3_M;TI.LLPDilr.IEIDlSll7F1'NCEAAtlOTHrnEROSlONcotITROI.MEASU~ES.~ORSfWlf\M:AlLmOSlONCON1HOl
Mi:A5URESINSPECJEDBY11IEClTYENGlNEmPRlOllIDI.IIY(;fIA!lINSN;IMTlES-
B.8i:GINUlIlJlYOONSll/UCTlON.
4_BJ:GINSlTErARlHWORK.
5. f'ERI,W!ENl1URI' ESTABUSHED Of lIlSTUR8E!l SOILS ON E/.IBANKUOO MlD SlOE SLOPES INACCORomCEWITIlllAlmSHED
~ANOAIlIlS.
7.COUPIlJESlJ[E/IRIIfI\lORK.
a.COI.IPIlJEUlllllTCONSTRlIClION.
9 REMOVE All SU DfJ'OSlTS FllOI.I sm: IW RDlO'l!: PERIUElER SlLT lTh'C1~G -"10 CHICK DAIoIS Ul'OIl f1f4lJ. ACW'TANCc
OFTHi:PROJECl.
0::,,," _~=__~_______
Fl_907.!19
m.e03.1J \ \
\'\
\~
\ ~
\\
\ \ \
\ \'
\ \\
\ \ ,
\ '
\ \\
\~\ ,
\ \ '\
\ \
\ \ ,
\ \ \
\ \ \
\ \ \
\ \ ,
\\ \
\ \ '
- - - _ _ \ ~ ~ ~~n____ _______
,
,
,
,
,
,
,
,
,
"
HYDR/J/T
SI.NITIdlY
@UM1Hot!:
TOP~909.22
i
>
!
~~<:"!~SI
/f1._g~~
!'''''''["'
l i
o
E~-STI.<__ ;. I
E~-S7M~UANHOlI ~
Ex_wru_tx_v",,'_E~_wTM~E!ll&WTM
1NV=900_51
LEGEND
."
o
Co
.,.
6
~
FXISTING
PROPOSED
"me
PROPOSEDsmmCClNSTRtlCl'ONSKO.Ll.SE
COMPlflEllUSIlf3N'1'!l()YE!lVA1ERI\LS.MElIlODSOf
P~EMOOA/lOTESTI~GAS REOOREll BY AU liCNERNING
SPECIFICA1I:lIlSOFi11ECIlYO,ARllENHlllSNfllllli:
S1AlEOF~IllN=Am:PAHlMOOIlF1RNISPDRfAi1[JN.
@ _S!\NITARYSEY1rnMANHOlE
^ _HYDRANJ
t:'"1(;
[~::lpp _ CA1!:V~Vl
o -POV€RPlli
@J ElEW'HONrBrn:
('0 _STOR\lsrM:RI!A~
jjjjjj _STORIISEWERCATCHBI.SlN
"
;t
~ SANITARY SE\IETl ~ANHOlI
: HYDRANT
..
E G~lE VALVE
~OlE:
COmRAl;TORTO~~KIlNIllICl'TOAllfl1SIOENlS
IIf!1:CTIDBYlQIPORIJlYWAlERSDMCtlNlERRuPIDN.
"'
H
..
"
..
.
2>
-,-
-I-
-~~-
'-""--'
'-""--'
.m
.,,,"
_ STOR~ SE'hER MANHOLE
. STORw SE\IER CATOl B!.Sl~
_ SlOR~ SEllER \\ElR
~ FlARDl END SECTION
<=rLAREOENDSECllOOW/R1PRAP
_SANlTARYSEioERUNE
_I'/ATERUNE
~ SlOR~ SEY1rn U~(
~ 2' CONlUJR
~ 10' COOTOlJR
I> ~ FlARED EN\) SECi1ClN
i:(;Al.lICSTO 8E:llSUl ON Allwru mTlIllS
NSUlAlE~wr-ENcovrnlSlISSTIWlB'.~ARY
w.NHOlES SKO.Ll.REOUlRE Ex\ERHAlCHD.lND'SULSI-SPER'
tCllYOFAAOENHlllSSPEDPCAllOOS.
-EX-S~N- ~SANITIIRYSEI'/ERUNE
---{X-VrrM- mWATERUNE
-[):-S1~1- ~ STOR~ SEllER UNE
~-"""J_.-. - tCONTOUR
...-..,-"J.-...... ~ lD'CONTOUR
AllSlORlolSB'/EROI.lTIDSSHAllII!.VlOO:l.ISTJJCMNIS
TlEOWIlICHSKo.u.ll!:INCIIlENrAlT01lIEUNITPRICL
~c:::- '~'.":"..:_'':':' . . .1
7
of-
'^
PRELIMINARY
FOR REVIEW ONLY
0' 25' 50'
r---_
PREPARED FOR:
~
~~v
QZg;
Z::;!l(1"')O
;:l ~..;-.-4
o;:3gt!j
~~..J....c;
lP""'$:2\C!
f:: ~Z ..-.-4
5~~~1;)
B~<~~
REGlSTRATlOl,j;
I nerct>y certify tnot tnis
pion, specir.colion, or
rep-ortwospreporedby
me or under my dired
supervision, ond tnol I
om 0 duly Registered
LondscapeArcnitect
underlheloO'softhe
stoteofMinnesoto.
-
AlAN ~ I<RETh<AN
,-.....--
05_07.07
-
15144
...,.""
m
.-,,; "
~~!
i~i
~
]
,
!
!
,
I
,
8
,
!
i
I
!
!
i
i
!
!
!
i
i
,
,
,
;
,
,
I
;
,
!
i
!
l
~
dill
~:i
zz
o.
REVISIONS:
No.: [Iota: Item:
L~CITI'SUlWnT"I-
(j j
Z ~ t:l.
t;lZ~ii1 ~
~oi;lg ~
p...t;j!:lf(l ....
Z:SZ ;0
cJ <t: ~~ ~
!E=:~i;la 6
~ [g ~[-<:a ::E
j~b!~! ~
!u ,..,l.,:;:. ""
100'
,
I
.
i
i
,
150' i
-~ 06101
D""",By. MLS
~'" AAK
- 05.03.07
1i> -
C4.1
ROCK CONSTRUC~ON ENTRANCE
NOT TO SCALE
FRDTERRI>. DESIGN I>.SSOOI>.TES, I"IC.
HEAVY DUTY PAVEMENT SEC~ON
PROTERRI>.OESlGN ASSOCIATES, INC.
EROSICfI"""",",-(<C-U'O)
NOT TO SCAll'
FlNISHEDGRADE
Hj2"BITU~INOUSvrr.AACOURSE
(MnjDOTSPEC.2340,TIPE41)
2-1j2" BITUMINOUS BASE COURSE
(MnjDOTSPEC. 2J40,nPE 31)
1O"AGGREGATEBASE,CLASSV(10m:CRUSHED)
(f.lnjOOT SPK 2211)
COMPACTEDstlBGRAOE
(TO BE APPROVED BY GEOTECHNICAL ENG1NEER)
SYNTHETIC FABRIC SILT FENCE PLACEMENT &; INSTALLATION
NOT TO SCALE
~
l.mIERIlARRlERSSHALlBE~SI'EClE[lIWWEllil>.mYMTEREAaiRAINFAl.LANDATU:I.STDA!l.YOOf/tlG
PROI.~GED1WNfAlL ANYREOOIi!UlRiJ'AlRSSH/.J.1!EMADEII!MED~1ELY.
2.SHOLUlTHEfA5lllCOEtOW'OSEORBECO~INEFITC1I\EPRi01lTO'JHt:EfIOOfTHEDPE:ClUlUSEABlE
UIT, MtlTHE BARR!ER IS STIll NEctSSARY, TIlE FABRlC SHAll SE REl'l.ACUI PROloIPIlY.
3.SEDlMENTOU'OSIlSSHlM.tl&mlovroAfITREAOlSTORIlEI'ENT. THEYWI.ISTBERDlovro\\HEN
DEPOSITS REACH APPRl>>:Illl>.laY HI.lf THE HEIGHT a' THE IlARRIElt
4. /oJIYSEllIMENTllEPOSllSREl.lAIN~DmPlACl:I.FTERTHESlLTFENa:ORmTtRIlARRlERISHOlONDrR
REQUIREO,SHAl.l.OCDRESSED10CONFORW"'THlHEEXISO~DRADE,PREP}J!EDANDSffiJED.
STEPl:
POST :SETPOSTSAHDEXCAVI>.1[A
~".,' lllEHCH UP51.0Pl:
,AlONGlHEUNEOfTHE
..... ":;1 · '~~..
"""""H!! ..,.,.,
;;'.". "J:
~>
STAPLE THE \liRE IlESH
fENONGiOE/lOlPOSl.
""'
"'~
ALTERfABRlC
STEP:\:
I>.TTACHTlEF1.IDIfAIlRlC
TOTKE:lIlREFENONDA/IlI
M~~
..~...."
;;'01'
u......;;;
.~
.,
SOTRIIOf
OfWNADE
..,
~ r"' A4il
PT'A'~-PT'A'
~
-'""""'-
PllIIIlS'A'SHOUUlBEHIGHER
1K/INPClNT'S'
PROlERIIADESlGI<IASSOClATES,II<I(:.
"""'CO<COI<lRCI.lEC-'01)
IIllWWATl"'''''-l
W~~~&lllP~=@
f-~e 1i11
._.~~ '~.::... !.
&I"""""'" !
IL-------..'-
I" '__.. 'i
{l---=~ '-
~' _ /_______i
'L.~~-;::~~~
0,
TDP""""
U',^.,.lI
~
~
.~
::.&6
~*~
,-
0-
DoD
SPBJFI[ATRIN!i
1......~IN", 0"" ~r",,~ ~.^n "An"~ 0'. FOM..,'" ;"ClIM'NU" rtlN""'''''''''N (D""'N~D~SCY
~~fl::~W,"J:.grf' HHT"'~", ("o"pa~"'H5 un""'",,, ,'>; ~.."~~^n BH'.^'"
LU'5 "~!i'y. o~c ",ece '''~~'O "CAW a~u"" poo .ran..'.O....Lu."NlJ" ooon C~~..[ .lJnna~~o.
3"5' n~M TU'''OR!Q aCAS5 ~'.~5 GL.-.-S IS sH~EO '0 UOb~ "....,~ "Ii'~
1~"'P"~,pu~' ~'''t:<lN' ~"~L. TWlJ [APTlH '~1J..a ~"..,""s o's,..~"',t ""N.
A"~''''''.Y .RU" HU;!~I~~ "~TMO"] y... u.. OF "It".....
DPTI~&, S.M' S~'CllC~R SEG'''''TOO ""COO.TOR 'O"'8IN,S WITH ."C' tc1'^" 'f,,~e~.n
l.""'~ '''PIlnn..,,,, ~ ""AW"""" THRn"'lTYPE "1 U5,n n'"nJBl<T'""
US"","'NG, CLOSED <nL .~O~, G"'I(H'N~ <~"~R.~st.O enwSEN 000>0 A..n ~~~S'''G .eA.'
.llP"C"lll<~..a"M.
~,,_ H"LD'''' .<U~L(. ~^". "uMoH...r~
L"MP.{UYOTI-II'RSl
UAUAST. H.~,'.!C."",'" ...U'''TR.......FOR..''R ~O' S-''''R''~G ,..,P('R...TuRO
AR", r.:'5'iil~;'~.~":;'i~"..\;1.,::rl";;\';;O",V.'}~O~~,,~LJJML~U". "'RM" SOCUR.O To ~OUS'''$
.,:11,"'. PDLVESnR POWDeR CO"'.'."'A" ". 'HE MU,O "s! PR'S5U~' "JJ""R w"'-~ "'T
~: ~~J~rr;.r;r,,'" ~l:r~':}!if''f..~R~m" r~HMHP,W"D~l'ile.~r.:'~I~~','Rl'Mi~~,oW
.u:;(TRO.-rUICALLy....rrL"O .o:tLR[O nOcY[S'('R ~OWD"A '~r [on IS a"~c"
..., ~OO' ~"H'ER...'UA' 'llA'"'''''''''' HM'ONe'li "'NU E>.TOR'OR OU~"'U'L'TY
@~=-
"'''''.'-..''''''''''''''''''
-,"""'"
STORM DRAIN FLARED END SECTION TRASH GUARD
"m~
1. mTR1oSl1DU.\RDSstWJ.BElW.VmlZED.
PROlERRADESlGNASSDCII>.TES,INC.
OYrl[AlSQUMlEraU:TEIolPLAU
~o.t"~'
o i~.
, .-.....
~,-
Ul""-15
fypn:"'lRRtnRrOU'EMPLA1E
tj1+i
" 0).. f
o ~'~
1,-""..
o 1+"-"
L"-"DL
~,o:u;
~.
OPTICS
v C~""!i!
R
s
crm"
:'-~
~~ ,~
G r.:V':'.~
NDl TO SCALE
\~
"",
-:::---""""'--"",
""
,
"'"
PIANVlf"W
'"ROOS(lllAIISYERSE:
I>.Nl1\JD!NAl.
ANOlllR1IPAIIO
BOTHEIIOS
.----~
---=-.........:::;;.....
~--
.'"':~
~
j
ullU1los_ smRW "".... (s,,",,_,"")
WALL MOUNT
"UIi~':':U':.IZ~A""
l--____
I! ~__
(j~~~1
J, -/.4'
'--:===~.
<.1'-",_;>..,
f~
""'''''''U'''wM''''''' "".., """
'''''TAC'......'........Llo...o<n
ASS!OMOLY"""V,nrn",meLll-T
""",",,,,"J)""H' .....u~~.""
"""TU""",-"",-Y\Wl[<~
~.n..""." M...... ..U..
A'U,""U" ""U,""
T"R" D~"UL ""TE'"
"OJI"''' "'.....aA.!Ii5T...
Tn""'A'''IiLA~'U;.'.
'''''"'''''''',""'",'''",,.
WAlJ.""-ATE
:tU"T
r", ...lj)-- ~r
.L: ' .J..
I+'W+! ~.,'f,.':,;,
..
.
LAMP
MOUNTING FINISH
OPTIONS
~lTr'.E m! Yollnt
'RII"~i/1
[J1,,__...
o """""'",-S>o!lJl
0.."
,,,,,at
0..
c~~r::.
...
[:"...oQ"". :110.
n... ::;,," :1'"
.,....,.,""'U..WL....
,~"O,2Dv...._y
....0....
~:.~..;;.~;::J
~...:.
,..
~
0.,,,,"
".
D,."m'''''''""O'W:CEU.,,OLTI4O
/EX-tWfUm:l>GY].,.;TP".V
D;:~,_y....P"
oS'""",,,,,,,
~"". mY:
8""...>......
[MV......)
".
:J"-l7
".
:JOlT
O""LEn..__m.
'.'m.....'..."
D~=;..~~
"n,,,",
D,o"",rcl>
.€~
D......
l<,_....."
",....
M.'
~
._." w~
~':- -'-
""~"..._~.""-'<>'<L,.",.'
...,.. "~~'\",aa'~
STORM DRAIN TRASH GUARD SIZING
I
!'
NOT TO SCALE
~ "I-BAR 'H'-BAA ". ,.. .,
,. ,. ,. ',,'-IW!S OIAl.lETEltOl"ENSlON
INCHES REC'D .~,
'" , , ,
" '" H , ,
. '" 'I' 'fi ,-,
. H , , ,CHl
" H , H "
'" H H H "
" H H H "
. H H H "
n H 1_12 H "
.. H 1-'2 H "
" , '" , .-
" , '" , H'
'" , '" , H'
" " '" , ,
" , H " ,
V , H , H
. , H , ~,
. H , H ,
" H , H ,
'" H , H ,
" H 1-12 H ,
. H 1-12 H ,
.. H 1-12 H ,
" H H H .
.. H H H "
" H H H "
.
.
.
I
NOLES:
l.8ARSA/IlIPlALESSHAlJ.BE
IIOT-ROOfDSTUL
2.BI.RS.PlAmiANllPIPE/JIEFlNISlIED
1\\lHM:lCOP.lS~Al.UWINUlolPAlNT.
3. AlLBOLlS/JIEGAlVANlZEO.
~
....L
i-
,.
~
PlANVlE'W
PROTERRADESlGN ASSOOA.lES, IN(:.
"'"-IfES_51C1RIl"""",(sn<I<-'FI7)
8612 CONCRETE CURB AND GUTTER
I<I01TOSCAl..E
R1Jt"
SLOPE QUTl'ER TO WlTCH
~tr'SlASMRE~iRf~kr RS
r
1 ~ "
ISLOPE 3/4' ~ER IT.
. 12-
"
J
,.--j
I
".
PROlERRADESIGNI>.SSOCIATtS,INC.
!mItnOE'$l~-C<lNl'JlETt(CO'<t:-"'5)
PRELIMINARY
FOR REVIEW ONLY
PREPARED FOR:
~
o
'"
~~
~~
~~~O
::> -~,...
O:3IoC~
..c~..J....."",
UE-<....onO
p~i'::~
ffj ~"'!@~
-'0 0><
lIlO :r:<
u!:;i!. tl..p..
REG1STRATlO~
Inerebycerlifylhollhis
plcn,s[>ecificolion,or
rept>rtwcs prepared by
me or ullder my direct
supervjs",~, 000 lhol I
om 0 duly R"9islered
Londst:opoeAtchitecl
under the lows of Ihe
stote of ~innes"lo.
-
"-""~""""""
,-..--
"'"'"'
-
15144
~,...
,
!
I
i
,
!
!
B
,
!
.
i
I
!
!
i
!
!
I
!
I
i
!
,
;
;
;
!
!
!
i
!
l
~
g!:!
~;
~~
~i
"0
REVISIONS:
No.: OllIe; .....
L...~ClTYSUBMl1TAL
tl
Z ~
~Z~:g
~o~g
Po< t;:j~~
<c Z 025 ~
U <C Z::E :;:
i E=: ~~:i ~
;~~"'SJ '"
i--1E-<h.d
, ~ 0 09~ >
lU~~<~ 0
,
I
,
I
i
i
I
-~ 06101
OmonBy. MLS
~"" AAK
- 05,03,07
-
C5.1
mmmk-
\1
J !
r I
Ii!
I: i
"uGHI
/
,
ClE"<'IB9.90"
lOO..-agz.OOl
".
PROIKllOO
~"
II
Ij:
'!ill I,
I~: \
10 \
t \ .
~n______I:_ "~~ "am
I ~ ~""~-"~
~ GATEWAY COURT
a!~8B5.:;O
1"-'-H_~l
1 POND \
\
ID
SPECIES DBH CONDITION
Fn~ Scolth ...
P<I..Scolth "
Spruct..whJl. "
~'l'i.. red <,
Uq>l..'" <.,
Spnr<t.oIII1. "
P....ohll. '"
1Ish,b1odc "
P....wI1ll. "
P",. .h~. "
~~ '"
Si>ru,..""lIe "
1.!opI..",1"" "
Sprtoca,..nll. ,.,
M,.. "
Spruct.*"ll. ..
Spruoe,whil. ...
P.... wh~. ,.
"~..., ,..
Sp"'co,od1il. <.
lM"" ...
Spruct,otIi\. .,
P....oloij. "
PiI..obit. .,
P...."'",I. <..
In''''' ..,
"-~ ,..
Pil.,","il. "
~~..suga <..
Pil.,"";I. "
.
.
"
"
"
,.
"
"
"
"
"
~
"
"
n
,.
,.
,
"
"
,
"
l.DflIj;,.r"rn.I.,.rl...m'_o\~.5'obo..gr"",dl,1<l
2.Conditi:>ois"'ledoo'''I.ofO-l0.;u,Oboingo''''odl'..o,,"'O.~.clt.-
I
I
I
I
J
I
J
J
CERTIHCATION
\
\
\
\
\
\ ."
0
\
\ C-
\ .,.
\ d
\
\ ~
\
\ 7
\ of-
<"
\
\
\
\
\
\
\
\
liGHT
.
111111111
\
o n
t---) ;'
1/
" - - - ~------ -------
----------- "-
,
"
,
,
,
,
,
,
,
,
9GmlURE:
I fEREm' WITlFYlHATTH5 PWlAm SUPl'DRllNG AElD tlSPEC'OONS WAS CO~PL!IID BY IoIE Oil Ul/IIEilll1' DlIlECf
SUPElMsmN IllIl THAT I N.l A CEJmFED mEr r/SPECTOR LICENSED!I'1' m( sr~1[ 0, ~NlEStl1A, \lO'AFmIOfT Of
AGRIGlPlTllllE. (CEllllfICATION 12(072160)
NllME:/J"'II.Krolnl..
O:;.OH17
~4~
PRELIMINARY
FOR REVIEW ONLY
O' 25' 50.
~--
100'
PREPARED FOR:
~
~g
~v
QZ~
Z::E~o
:> h..;....
o~g~
~~...:l....."""
OE-<5:~~
f'gJZ":;:
~:;;'"~~
B~~iE~
REGISTRATION'
I hereby certifylhol this
plan, specification, or
",porl. was prepared by
me or under my direct
supervision, and lhal I
am 0 duly R"9jstered
l.<lndscapeAtcnilecl
under lne laws of tne
slaleof Minnesolo.
-
"^" ~ <RffiW<
,-..--
05.07.07
15144
-....
~i ~
~l1lj
~~-I
Hi
~
.
I
I
!
I
I
,
!
i
I
I
1
i
!
,
I
I
I
I
;
I
i
i
!
~
g~
..
gSi.
~i
".
~o
REVISIONS:
ow.: fltI\O: 118m:
1 lIS.orm .....lTV!l1l8o.llTTAL
j
t:l '"
p;<
Z ~ ~
t;;lz~iil u
~ 0 ~g ~
p-<t;j~~ ~
~zo1S t
U~Z::E ~
j [:: ><~:f g
,gJWJ-oii: ::;;
L-H'-< h ::l
iW089~ ga
0. U ~ !;f<~ ~
,
!
i
!
l
,
!
~
I
,
i
i
,
150' ~
, ~
-~ 06101
O.......y. MIS
~" AAK
- 05.03.07
~ -.
L1.1
ROlOlli:/IltDCAllCROW1IlIO/O'RETAtI
rCRIL RE\lIlVIIl. a'uP TO 1jJ Of
BllANCMNosoo.o::l\IR[tSACW'TI&l
Pll""EnU~lJIIlls.COOOI.IINIIIIT
IL\OERS, OOllROKDlIJlDE.\DlIRANCHES.
SOlII:Ir</ElJIJl'\l'llGSml LATERAl
!lIU.NOUllAY8EPRUllro;~OO
N01RIIIlllETHElffiIoIINAlEHlSOf
ElRl.NDB'lliATOODIDI01IIErnGEa'
~=~
WARKlHENOR1HllllEOflHElRo;lNlliE
NlIIlSEIlr.AHllRORIElliElRHTO,At:E
NORlHATlHESnr\\1ENE\oOlptl59!ll.
EACIlllllI~UST!II:I\.ANlIDSI.ICHlItI.T r
Tl/E1!lll/ll(fUJl[lSW>8UATlIiE;TOPtJ"
THEROOTElAU..1REISMmTHElRUII(
flARE IS IIOTIoISI8l.Esw.u.BE R:E.ECTED
OONOTCOI'ERlItl:101' tfMROOTaAU /
"'lHstlL ~ r
~~~~:~~ -tz~
{REf\1l1O !Pl'ClnCllnON~ DO NOT OOIU!
IlOOTBlIJ.l<lllSCIL
:iw:l(TOP1/JOfBlJRlAPOIlROOT a
QPLANTING DETAIL-DECIDUOUS TREE
\lIIlEOIlCAlU=S>W.lR:E"5~
lRIT511P1O~lIIl(2.51CAUf'a!-1.(;I..
lRIT5ti5l11l{2.5"}1075l11l(3")OOJPEll-12GJ..
~1oIR:E(lIlCA!ll.[ONlYEN(:l)QtIOkW'mCil5l.ll'Pill1l-I.tl1lWFORSOMElRUNKWO\ELlOlT.Pl.lS11CHOSE
~m!ll:lOKG~TOA(:(:QIII,<{lI)Al:E J5 MW (1$ CJ'GROWlHANDlIl.fffil All lIRANCHES f'iltlol THE"1It.
TUCK_=rn~OfllE'/IJlElJ!CA8l[IHTD'lli[\lIRE_SOTliA1NO!>IAAP1lIREEHOSIJlE:EXPOSEIl_
!JIlI.! (~.5') VIA.
PLASOCHOSE:
CALVI.M2ED"'F!E
IJl CABLE naSI \iIRE 10
,-
6'-lI'S1EElSTAl<ECll
(ffiIERAPI'IIll\El)STME.
~~~
IJ.tSTI.Kl;SSH/J..l1lE
rilMIiwT!iDElIiE
EDGl:llFlIEROOTBIJ.J..
IISSURE lIiAT lIIE lEMlNG !lJRFACl' Of THE PROm:T11lE COlF.Rt/C (f" lIiE HRE CR CAeu: AC.OJ~ST lHf.: lRH
lllUNK IS A "1"1101I.I\I01' 11 ~w (0.5")
1SI0'0tAl.lSTAKtlCASSDDN ASlH, 1RITIlI.SGROIl\l SlJFfl(Eff ROOlS 10 tMJlWolETHEPROBlSIlllAT
Rro,IlR(DlHEIllEE1OaESTAKEIl.STI.KESSH.o.llII[REloIO\'[J)IfOl),ITHTHAlllHEE/4lOFTHEFRSlGROlllNG
su.sctl1.Filll1'l>>n~G.
lREESNCfOl.\lJ.rOOIlOTHWlTOBEST~EDIIIIDST/.XlIIGCANBEHARMFU.TOM1REL5TAXtI"SHWlIBE
DON!: (IUliHH THE APPROVAl Cl'lHELAADSCAPOl IIl[HTECTFITISEXf'l't:IilI1H.o.TlHE rnEE 0I11 lIUT BE
A!IlElllSUPPtRllISElf.
EB TREE STAKING DETAIL
~, 75 MM (3") CALIPER OR LESS
~=
r.l'r.mUr.lJ,&rm<<:RFTNP1ANTlNGAFnPRll'.lIIAIlON' AllIl.l5SPlAAnNGBEDSSHAllBl:1IllEDIOALIIN.......
DEPlH[J"~I~Cli!S.
^"",'" P1 ,.me llm """',........ PflQIlOC 1 fOOT OF STERU PWmNG MIX AND rnmuZE 'IAlH A l~l~lD
GlJJlumFEllllUID!PERlHt~AIlllfAC'TUIU'S1I!STIIUC111J:lS.
EDlIIUZ!Jlrtj; AllPlANl~AlERlAlS!XAllElErnmuZED~=AIlAnOOW!IHTHErwO'fl.llGlTPtS~
C1J.oNnnES ()I" fER'IlLIWl W<lE!l .. 'OllH TIE Pl.>/ln.~ Sl:lL PElt lHE IlAllUfAClllRlJl'S lNSTROCl1Cl:lS.
~.<PPI.Yl~lo--IOQ!AMJWlFDmJlEJlATTHERATECf1\lELVi:tl.INCESPER11/01(l'rn1lt!
IIIOiGAUPffiTllEE.IIIlDSlZEWK:ESPERSIiRUB.
"',uUFll.NO,"lIUM11"r.fAmlRl""N1TIIrIlrr?r"P, Af'f'I.Y~20-:20GRmI.IVJlFtR'ilJWlATlHERATECl'
TlIELVi:OlINC(SPERTWOTO'rnRE!:"CHCIl.IPERTRELANIlSlXOlM:E5PE1lSliRlIIl.
~USEnExCAVA1IDFIlOllPiAA1JfGH(X[SAHD'rnDROUGtU~C;IH/JIEHDIlOlTS.SCll
IlWEHD~EHlS !XAllIllCUJOC lfl PrAT ~DSS TO 'lfl EXCAVAlED SOIl. fOllJ..ll'lNrOOG sm III ADOITIOH.. DRiED
BONE lID!. fOll AllI'tJlfNl<lAl. lOCAnOllS. IDlDVi: IJ..lIlWlIS ,NQ.UlltlG ~<;>:.><;S WIG[!! 1HI.N nma:: '"t><
,-
EJlG!!jj;:I!IG&lGSliAU.BEA~MolWI)fAIWflINCHTAll.P\<C~lJlWlfFJXllNG,flST1I.illI'IAlH
THREIUEfAl._STAK!:SP[RTIe(Jy,OOTSECnDII.All.IoIAS5PI.J.NTJIfGBEDSSliAU.lIIlVi:tDGIIGPl.ICE1I
lIEIlI!'EHllUl.QlIJlLO.ANll!JiYMlJAtDlTTURfAREAS,lHfS5Sl'ECflCAl..lYNOlEDCI:IUf:lAIltlSCN'EDPt.>><S.
~AFT<R1l!l:SURFACE:Cl'lHE(:llCIJIllHASBEINII./.XEDSllOOlH.AIllERIlAT'IWIBARllIER
SHAU.1ll: IUCHlIN All. FUIIlJlI: Il!lls, EXCtl'T WHERE PEIlDlIIAlS HAV!: BEEN ~ISS I'1J\NTEll. 1H!:"I.tED
_mSHAU.BELA/lDSCAPfF/JJRIC'OllHA"ftUllITOF~.5T05.50lJNCESPEIlSOUm;Y.IRD.fIllRlCSHAU.Bt:
IURAW!lDU(ffiSTA9IUlED NlDIlAVi: A WNl~UWfM: 'lUll IO.lHEfl.IBIU1YFA(:1(Jfl" FlPU.SUNl.IC>iT.A
SIJiI'lfIlTH~UfAC1lIlOl'SSPtOFlCAlOISll\!SlBE~IllTHELANDScAPEAilCIiIT'ECTf<J<RNE\I'AHD
APl'RD'lAl.PllI<J<IllINST.'U.\llltl.
MlM:U M; SPECflIJ) ON lHE L.AmSCAl'E Pl.ANS- All1'l.All1t!G 00lS III RECIlII: A lHREI: INCH 1lIN1~U~ DfJ'lH
Cl' ~Illll, AFlEII 'IUIl BI.IIIl{Il HAS EIWl SET III !'\.ACE:. All. 1IIDJ~IlUII.lYPLJ.NlED DEllDIJOOS 00 alHHROOS
rnEESRt!EV[ASIlINCH~IIlIl.M.lDEFTHDF~H/JID'IiOODI!Ul.QlI\l'rnHOMLU:liltlDfiECTOONTACI
i.Qll! TREE lRUtlK. WIHIlIU~ 5' IlLWrnR
~lTlSlHEl.lnlSCAPEcctlllW:J[)fl'SRW'ONSl8lJ1YTOT.IXE[V[RYSlEPNEI:E5SAAYTOIW'IIAIN
lHE1IlEESANDSlfIMlS~AllUPRlG!lINIllf'lU~BCONlll1lONATAlllMESUIITl.MOODlFlI1(Pt.AN
W/JINI1!EPERloo.ESProllUrYiliERE:VAHDJ.USIl.SCl,CIlWlr<[lCClNOlTl(tlS/J!E:APROOLDl.IFnEWlDSCA"E
WllRloCJ[)flPERCEII!:STH~TPIIOOLDlSCOi.UIo;(Ul,ITSllAU.IIElH(lAADSCAPECO'fIIWTDR'SRESI'(lIlSlBli.IIY
TOST.IXE.oND/rMGUY1Ill:lRrrSAtCCllllINGTOTHEOfTI.1.S.
GJPLANTING DETAIL-DECIDUOUS TREE
15"f>(llYPIl[PYl~[0Il1'a.l'ETH'rlfN!:
SIlW(WlIl.-)(ro>.)
llflAPTREElDl1RSlBIWIO!(IlEGIIlNIIlG
AloonClol}
flACllNC(ON[l'[HII!RE)
RCl)[NTPIlO)[CJKfl
lCf'OFROOTBIJ.I.lDBl:I" A9O>E
SLIIlRWNotlliGl!A1JE.D.tTIlIPEF(R
Il.OUl'LOCAlEDATlllI'OFROOTIIALl.
PLINllNC SOIl. (REFER: TO !<'ECIFlCATlOO~
00 ~D1 COVEll ROOT BAllIllll! SIlL.
=
,~,
TX2"~~" wooo STAKE. sa AT AlII>1.!.
TAW sm AAWND ROOl BAll. BASl:
F1RlU\lllHFOIlTPRtSS(lRESOlH~T
ROOTaAU.llOEStIOT*,
oom:IIlCl'ROOTBAlLIllSJOII
lIND.CAVAffi) OR 11.l(l'(J) SUWlAOC.
.,=
Olllt ORC>JII! SIZES Sll>UIIE M; FaJ.OI<S:
mEES uP III 05 ~W (ZS) CAIJI'ER _ l~ GA.
lREES ~5 WY (2.5110 75 ~W (~") CIUI'ER - 12 GA.
](mOlWIREOROOu:ONlYDlWGHlOKW'fll(iIISlJPPIMG..<U.OWrfJlS(I,IEmUNl(~1.pl.J.STlClIDS[
l>iAll.Bl: ~G[HD.tGH III ACCCUlIWATE 3S .W(IS OF CIl(lWJH moBUFfOl All BRI.lQiES mw lIE !IRE:.
TUexAHYLOOST:DfIlScrm::WIRE<J<CA9I..I:INTIllllE\Wl!:lo\lI.PS01H.o.TNOSllARPIMREOOSAREEJ:PDSED
IIlSlI.l.lTHil&W'flWlESPER
1REE,SPACEDE\oEHLYAA~M
-
13l11!(D.51!L1.
~"~
Pl.AS1ICru.OOHGfJlOlHEil
~SUAL W.IRKO!
.~-
7;Clo.l(%)l.ONC
-"~
AllSl^"ESl>iAll9l'URlI'EH
C1JT5l0ElHEEOO:Cl'TllEROOT
~
ASSIJR!:lI1ATllEBEAIl1Nlis.alFACl' Cl'lHE PllOTECnVi: CO\IERIHCII"lH(IlIREOR OOUAC/JNSTlHElREJ;
lRUNK IS ~ ~1N1ll\Jl! Of 1110lW (cS)
fla,IOII:All.STJJ<JNCAS~ASlHETREEH.\Sll!OI'I\l!lJmrIDllROOTSlOOI'O<<XILlElHI'PROOLDlll\lT
IlEOOillEDlHI'mulll&SlAKED.STAK!:SSllAl.I.IlERElIUIHlNOLlll1llllANlHi:EHLlDFIlEFlRST_G
~~~
TREEStIOOI.IAllrOOHOTNmlTOIlESTlJ([OlHOSTMlNGC/lHBEHARIJRJl.TOlHElIl!LSTAKlNGSiOULOBt
D(tl(ONl.\illHKAf'PllOVALOflHELlMDSCAPEDAAQilTECTIfITISEXPLCTrn1H.o.1MTRE!:llIl1HOTlIE
ABlETIlSUPPMTITSEl.f.
6B TREE STAKING DETAIL
~, 75 MM (3") CALIPER OR MORE
~=
~lTlSlHELlliUSCAPECOOlRl.ClOII'SflESI'OIGBIUTYTOT.lXEEVi:IlySl[PNECESSAAYTO
~AlNTlIIIlHE TREES /JfllSIiMlSIII~ UPRIQlTA>/Il PLUWB COODITlCtlAT All T\lIES UNll.TllEEHD (J' THE
PlNI GlJAAAHlD: PmlOO. ESI'roALl.Y \!I1EIl( ~J.HDIIU~, SIlL.ClI"'ND COIUllllrflS /J!E: ~ PROElW!. IF 1HE
~Dscm:caflRAClORPERlE\IESlI\ITI'IKIarUS(:CIJlD(l(:(:l.El,ITSIIAU.&THEL\NllSCAPECOIfIRACml'S
RESPOHSBUTYTOSTAKEAHIJ/tIi!WYH TREES o.ccoRDI~GTOHOCTAl.S.
~loItAPl'1NGUAlERlALSllAU.BEQlWJIY.lilEA1HABU:fMllllCTRE!:\l!lI.P~AHI.1FACTIJllEDfUl
Tl<SI'IlRI'O&-Allw:mUOOSTREES1'I.AIlTIDIN lllE fAll SHAll BE lillAF'PEll AFTIR HO\IOIBffilST AND
PRlOIlTODHBIIlEIlISTDFEACH r<AR.ROIDII:I.l.lIlillIlPPIIlG AFTIRUArlSlIHO PRIClllO.l.lNl: ISTEF
"~~
OIJlMPilrrtrr."rlOO-P1mIl(:(ONIJ.I.T1lE!:StxCEl'1CCWDlSI>><lBS~SPEllFlfOl:tIF'L\NS.
~=
lIAR1<Tt<::NCfllH&IlE
Cl'lHETll<EIIIlll!:
NURSERY.m~ROTA1t
lHE TREE TO r~a:
NORlH "THE ~TE
\\\IENEI!:IlPOS5lBL.E.
~._lt' NIGH S1iIl.
STAICE<J<OIlml
Ill'PROI!:llSTAI<!:
~-
OTIOllCfROO1BAllTOSlTOO
lO/OUVAlEDORTAIII'Bl
~-
GJPLANTING DETAIL-CONIFEROUS TREE
~=
01'11001
.~,
Ill'Pl.THEPlASTlCS!ffllNGlOOSElY/JIOONDlHEIRUNXTOIL\II:AI2UW(1l51GAPIlElVlEENM_
AHlJm::51IIDNG.
TREE OIlAI' 9tOlIlll BF; IlISIALlID AT ll~E UI' 1'I.AIl1elG /JfII Bt Ro.IOI'EIII/IIEN !Ifl<C1ED BY 111'; LA/lrlSCIll'E
AACHlTECT. illII HO lJ.Till TJII.N 12~!tfJHS AfTER PlAI<TW<G.
TREES lIHOSI' Nam! ORJ:NTATIOH IS HOT CH.oNCE:Il mDII THE IMlSEHY DO NOT ~Em TO B( \lIlAl'PllI D:W'T
TREES"'lHYEllTlHlH(L/JlK,9JCHM;RIDU~SHOOLDBEMlII'I'EDWAPPIlO\OOl~lHEL\IlllSCAPi:
AADlI[CI.
GJ TREE WRAPPING DETAIL
~=
~
tlFlHEL\<IIlSi:.\I'ECONTRAC1MPERCl'II'l'S~yocrIllEHClESlNlHEPt.ANTSUl:C1lONS,SOL
CONCITlONS,CltAN'OlHEll5llECOOllOltJIl\\1lCHWIGtlTNECAlIvaYNFECTPWH~AIDliAl
tsTAlILJ!>lUOO,M1'lVIJ.(lfl(:lJJ.fWl1tF;,lllYSllAU.BfMC'rnESEllEfIt:lENClESIll'rnEATItHTIONUI'
ML\I()SC/ll'EAA(:HlTECTIN I\\lI1INCPIlIOR TOINSl.lllAlIO<I-
2. IJ'll1l ALllllllllES HAil: BErN lOGAlED AND PIlCPOStD Pt.AIll w~roalJ. lOCA1IOO STA!(El). All OF THE
F'IlCf'!RDPL\I!IIlI,IEOllt.lllC/l1lOOWUSTlU:R(l<EWEDANAPI'ROI'rnBYlIiELlNUSClJ'EARCliIlECl
PIilORTlIAHYEXCAVATlIXt.
3- I.DJJSIII[HTS IlllOCAnOll OF PIlOPOStD I'lAIIIIlAIDlIAI.S IlAY B( NEEDm'~ lH'.: ITEill. THE
LJ.NIlSCAPE/JlOIITECTWIISl8!:NDlIFIEU!l1lOOlD AllTlJlollSlilEI<TeE AENSSl.
4.NDPLlNllIICTOBEWSTAUltIlIITlI.GRI>{MlIGANDCONSTIlUC1IONHI.SIlEEHCOII'lEmlr<lHE
IIlllRilATEIJID..
"""'"""
1.1'IlECELIDf1S-PL.AH1AK(SPIlECE:Il~CEffi(RL\l<DSCAPEltAlERIALSCHEDIJl[,-01SO'l(J'^"ClES'N
C1JNrn]ESEXlST.Sl'EOACA~STAKEPRtl:UIOOCl:Q;ffiHOTES,
2.1'LAcrJlENT_AllPROI'OSEDPlJ.NT5SllAl.1.lIELllC/llEDCAllUWTASSHD""OOTlilSLA/lD9CIll'l'
PUlIS-IltSPECTSlATUlDlllENSIO<ISllONUTSCAlEDRAllIHCS
3-PllOCEDUIlE(I'IlOCESS}-ALl1'l.AllT51(llU:IISTAllRlM;PEIlPt.AH1lHGOCT/JlS.SHllWSPAllHGDF
5'-0" OR lfSS!i!ALl. BE MASS ExCAV~lED AND/OR CUl.TJVATID BY llJJNG. PlAA1.. STAGWlED ROWS ON
ntEPERlIIETERFlRST.lIBII.HI'OOILYruIllWllHREwAIH,"GWANlITYUSlNGTRlJ.H~SPAClII..
~OCAfl\I'ifOOTRAOOJSAAE'OL.lIIOI'gmUE!SIJlWNDEACHDEClDUDUSTRff/INOIJ<~TFOOI
RADlUSCUARIJIU IJl(:UlIl EACH f:OlIFDlOJS 1ilEL Pl>>IllNGIlIJ)5 S14I.l.lBE~I.SS"UlCHm.
...lXNmcA]OOooOOESIflUBPEIlTYPEINOSllEINI'lAN1lNCBtDANDM!lYl'I!'E:OI'1REESHIUBE
<l.!Am.YIDENTIml(COLIWDNOlLlllNNOI.IrnlU.TURE)'OllHAPLISTlCIACWHlE>!9iIJ.lNOTilE
REl!tMIIPRIOR1(lO~ACC(P1ANCl'.
~1IlI' r"'.~rl';l./\lrnT.
l.smJAll/JIUSllISTURBEll(:O.t"TOGV.!JINGOlHEIlTllANlHOSEIll'IJ.NOTElITlIRECElI!:SOO
2.Tl!EfINISHEDGRAOEOFSOOORSffDAAEASSHI.l.lBtIElDTOONE:INE>!6UOWSlJIlfACEELEVAllOll
II" lR/J~ 5L\H. CURB, ETC. 1oHER!: 500 OR SEEtI AAEI.S AElUl PAI!:O SlH'A(:E5.
J,SOOSHIJ..lB(LAlDPAA/JJ.nlOTHE:Cl:NlOURSAHDSHAllHAII:SlAGCEREDJOINlS-SOOl>ilJ.l.eE
ST>J<l!ITOllEGllOUNDOOSIDfBSIllPiJlTHANJ:10RIIIDR~ACE:SI'AU:S-
4,RtpAlRAllD/o.llACl:Wfll\l"tRTYFI'ro.lp~lINGC1'tilAn(JllSAlt1OCOSTTIlTlll:OlINEJl
GJ GENERAL PLANTING NOTES
~=
Dl'WUIlUS !><RUElSSH/JLH~\IE
AL<IlII.IlJWOFAII:CmESATSPEClFltD
H8CHTINBS01lDl1II.sr5l'EOFlnICtl
L\NOSCAPENATEI'lIJ.5OIEDlll.
S'Ml6EllORI;CI.IPAClED!lJWl/oJ)[
L\HOSCAPEF/oBlllC(lUEllTO
SPHlFICATiON)
1'I.AIllING~("EFEl!TOSPECIFlCAlIDH)
aon~Cl'SIflUBTDSlTOO5UBGRAll(
GJPLANTING DETAIL-SHRUB
""=
PlAATT'II'E
PlANT SIZE (UP TO
I114)INCUIOING)
'"
4'IUI.
S'llB
;'llB.
n'
~ RB.
9'Ra
W'RB
IORB.
H/~'RB.
l-I/2"B.B.
1_:l/I"B.B.
'M
'M.
2-1/2"B.B.
'M
J-llf.~t
2'llll
",
4'llB
l~" SPIlEAD Il.B
'lSPllEADRB
2_1/2"SPIlEADRB
"SSPREADRB.
12'CCHT.
IS'lX:tIT.
\S"lX:tIT.
20WIl.
J'CCtlT.
~. CtJ:fl.
,~" a~
2'Il.B.
;l'B.B.
'I'all.
S'as.
a'as.
,~
.~
"~
.~
.~
,,~
.lPPRO>:w.TEHCU
1lEP"rn(INCHES)
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
"
,
.
"
"
.
"
"
"
.
,
"
"
"
"
,
.
.
"
"
"
,
.
'"
"
"
"
~=
lIHIIWHCU'OlDllI
~""
"
"
"
"
n
,
"
'"
"
"
"
n
"
n
"
"
'"
"
"
"
"
'"
"
"
"
'"
"
"
"
"
"
"
'"
"
"
"
"
"
,
'"
"
"
"
sw.oc ~ fl.OlUlNG
=
~-
,-,
-
(spREALllNG)
CIOlJIlUSSHllUBS
~--
~"
PlANT ROOT BIJ..l HIGH IN CLAY SOl. T"IP!: AND PlANT ROOT HALl AT ~/oOC'~ &/J<DY sm CONOl1lOOS-
QPLANTING HOLE DIMENSIONS
NOSCIJ.E
1.All500.SffDANDPL.ANTINGAAEASINDlCAffi)OOPLA/lSHIJJ.RECElII:100l:COVi:RAGEUIUSS
01liER\llSl'SI'l'CIffO.MIRIlCATiONS"lSTEIIIJ1:iJ.SHAllINCUXlElHEPllal.l:R1CHT-0F-WAY(RO'Ij)
BITftrnlHEI'HOPmrrlJHEmolHEBAexIl"CURIIWHtR{JI('I'LM(lstAPED~Vil!EHTS/JlE
-=
2.lHE.JiRIGAllltJI;OI<TRACTm!l1lAllV!:RlFYD:lSIJISAND/OflPIICl'ClSEllIli*A1I0NS'lSTENl0CA1IONS-
:3. T!lE: IRRlGA1I(fJ GOHlRACTOO SHAll !IE ll[SP{lIlSI8l[ f1lil PIllIVILlNG lHE fCUOlolllS l1E~S IliHICH /JIE
SIllJl:ClIllR8IDIAHDIll'PROVAL Br'rnEL\NUSCAPEAACIlITECTPllIOR10 FRlALACW'TAHCl'arT!lE:
--
A.A-SH(IPDIlA\!INGU1ISTRADlGAHRRlGAlKiNPLAIl~ICH,"c:.uDlSPF'E5T2ES,
HWlTTI'ts,SPRAYAAEAS,VAl.Vi:lOCAnEVls,Sl.<!WlGUlCA1IONs,ElWIICl1l
VALVELOCAllOOIHOCONIROUDllOCAIIOl4.
B. SPEClFlCATlONSM; A PAAT OF lHE SCOPE OF IIOfII(Ill-aIB1ODIHC-
c.CAlW.AllONSrmTll!:WlDESTZlINEANDMrAAlHrnZOOE-
4,KlRIllGAlIEVlCONTllACTORSHAlll!:RlfYIJ.I.UTlJl"rlDCA1IONSONPIlOPUl1YIIYCAWNC'1:lYlO
ST~TE oot c.'JJ:. 48 HOURS PIllOR TD SlAlltIG. llE1RO IJlU.: 612-<54-(1002 Oft TCU fREt::
HIDo-Z51_1166.rORlITUTYlllC/lllGls,COIflRACTOflSillJ..l.IJ.SDCONIIlCTPRO.ECTcootIlAI.
CONTRACTDI!PIlIORTOSlAKlNGHE:IJl/oNDPlPElOCAllONS-
5-1H<lRIllGAlltJICOHTAAclORTOCOORotl~TElflIlIGAnrn Sl'SrEUlIISIlJ.jJ,T\(JN \\IllIOTlEll CONTRAClOOS
WJRKrlGON9TEANOTHEPHISESrJ"CONSIRUCTlGl.
G.1TSH/Jl.llEm::INflICAlJCI:ICONTllIlCTOR'SRtSPDNSIBIUTYTOIN9.flE!lV.lIJ.1.SOO.smJAND
PWIlINGIJlLO.AR!:RIllGAffi)PIlOPERl.Y.
7.IRlliGAlIONlEAOSlOCAlEDNEX110 IlI.UJltIGSANO Cl.REIlINtSlCUSTst PlACED 1ll'PR0~IlATEUON[
rooTfRCIollHtPER\lAllEHIS1RUClLJRE.tI.'W~,lHESPIlAYPA1"ImIANDDlSTANc[~USTIlE
1Jl.l.l!mD Wl'REVi:NTQ;ffiSPRAYOI'llI'; BlIUlINGSAHllORM:WAYS-
G.ATm::COIIPL!lIGlOflHEIHST.IllA]ONANDPIlIORTOlHEACCEPTANCI:OFTKEIRRlCAnGlSlSTE!l.
lHERRI(;A1I(lNCONTRACHlRSllI.l.lPllOWlEntEOoN(RMTIt
A. AN IIS--lIIALl!lll.AMNGDFlHE:IRIl1GAll(lN = NOUNlEDOO lHEW/J.lN""tXI
TUlHEmG.\lI00CONIRO.IDt
R THE pRU.(t;! /J/Il TO PlANT W~ll1lW- GI!OlIIIl REOUOlE\lENlS.
t:. MlSP/JIE!EIS Cl' AlllllRlGAllCIN IOIlCOlll'ONEllTS(EOIlIES.I<<lZZI.ES,
CHEQ(VALII:5. OlSKS,m,)L&O" lHECONSIllUCnOOOflHE.......llOO
S'l'STEUFOfllH1SSlTE.
GJ GENERAL IRRIGATION NOTES
"'=
."
"""
=ru
-
,
,
8
:rx,"wowSTJ.I\t, I
POSlnD/lATDR1I'I.Il:
SIIlINGI'HICli.ORANOC,. !l
POll"ffin'lDlEL/J4/.lII O!
SAmY NETJN:l iUflID( ~
\1000O ST.u<tS PLlCE:Il~' ~
ON CEHIDl AHIl PL\CED ~
~~ "ih~ !
""~
,
,
,
,
,
!
I
I
,
NO SCALI ~
!
i
,
I
,
;
I
I
,
!
!
,
!
;
".
AllIREII'IlOTECllIllDr'<lCES/JIEJUllEr<srALWIPlllOflTOSTAIllrJ"L.AtGlIlISl\JIlBAHCENID
WA>JTOJISl UNll. FlNAL LJJIlSCAl'E IS lNST"llID. HO PAAJ<III.. STOfl~G: OR 0lHEJl CI:t<S1IlUCnoo
SlTEAC1lIlTBARETDOCOJR "l1cDN TIE TREE PROTECllON Alitl..
GJ TREE PROTECTION DETAIL
PREPARED FOR:
~
o
'"
~~
~~
~~~o
::J -..;...-1
o~o~
-<l::~....1~g
~t;S:=:2~
t:;~ffi~12
5890~
B~<iE~
REGISlRAllON:
Iherebycertifylhatlhis
plen. specif,cotkm, or
reporlwospl"poredby
me or under my direct
supervision. ond thol I
om <l duly Registered
LondscopeAichilect
underlneluwsoltns
steteofMinnesolo.
-
ALAN A.. KRETMAN
,......---
05.07m
-
15144
-...
~
~~
,.
o.
..
"
~.
""
REVISIONS:
No-: Palo.: IIM1:
L ~m--1l7 C1TVSUBlIlmAL.
,
i
I
,
,
i
o
z ~
!;;lZ~:g
~ 0 ~g ~
~tij~~ ~
cJ ~ ~SJ Q
j~~~j' ~
i~~~iE '"
'>-<E-<iiiiii Q
~ ~ 0 89~ ~
fU~~<! ;:)
PJOjoctNO: 06101
O""""1ly; MLS
C_1ly; AAK
,~ 05"03"07
-
L2.1
~
~HILLS
MEMORANDUM
DATE:
June 6, 2007
PC Agenda Item 4.B
TO:
Planning Connnission
James Lehnhoff, City Planner
2008 Comprehensive Plan Schedule
FROM:
SUBJECT:
Although the City is in the midst of the TCAAP planning project, the City is required by State Statutes
and the Metropolitan Council to update the City's Comprehensive Plan by the end of2008. While
TCAAP is the largest project in the City, the Comprehensive Plan reviews the entire City and is of equal
importance.
The Plan was last completed and approved by the City and the Metropolitan Council in 1998. The next
Plan update is due at the end of2008. State Statutes and Metropolitan Council regulations require the
Comprehensive Plan to address land use and housing; transportation; water resources management; parks
and open space; and plan implementation. Other topics, such as economic development and
redevelopment, will likely be included in the Plan in some fashion.
The update process is expected to last to December 2008; however, most of the work will need to be
completed by April 2008. The process will involve a handful of public meetings, which will require
involvement from the Planning Commission and City Council. Since the Comprehensive Plan covers the
entire City, it is less design intensive than the TCAAP meetings. Some parts of the Plan are highly
technical nature, but many parts will include public participation, input, and guidance. The Plan is meant
to look out 25 years.
The tentative City CouncillPlanning Commission kick-off date is scheduled to occur during the June 18
City Council work session from 6pm to 7pm. This date and time have not yet been confirmed. As soon
as more information is available, it will be forwarded to you. This meeting will be focused on going over
the Comprehensive Plan update process as well as the role that the Commission and Council will play in
this process.
The first community-wide public meeting is set for Wednesday, August 8, 2007, from 6;30 to 8:30pm.
This will be a combined open house and workshop with a public participation role. Weare hoping to use
the North Heights Lutheran Church for the meeting.
A long-term Comprehensive Plan update schedule is attached to this memo. The schedule is subject to
change. The City's website includes a Comprehensive Plan section at www.ci.arden-
hills.mn.us/comoolan.
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inet.us\ardenhills\Planning\Comprehensive Plan\Memos\60607 - Camp Plan schedulet.doc
Page 1 of!
Activity
Task 1: Or anize the Effort
Gather and prepare base geographic, demographic, and
infrastructure data.
Staff Kick-off meetin
Plannin Commission/Ci Council kick-off meetin
Task 2: Define the Context
Draft demo fa hie and socio-economic rofile.
Draft su ortin ma s.
Review relevant lans and studies.
Staff Meetin to review data and studies.
Task 3: Explore and Confirm the Arden Hills Vision
Meet with the PTRC to discuss incorporation of Parks, Trails,
and Open Space Plan into the Camp Plan and the role of the
BeBS rant.
Communi Worksho #1: Vision Session.
Meet with the EOC to discuss lannin !communi issues.
Review workshop #1 results with joint Planning Commission/City
Council meeting.
Task 4: Define the Plannin Issues
Assess future planning issues. Staff (including HKGi, SEH, and
Rosev1Ue to meetin to discuss lannin issues.
Joint Planning Commission/City Council meeting to discuss
lannin issues.
Communi Worksho #2: Identi ublic concerns.
Review workshop #2 results with joint Planning Commission/City
Council meetin .
Meet with the PTRC to discuss BCSS incorporation into the
Com rehensive Plan.
Meet with the EDC to discuss the draft EDC Strate ic Plan.
Task 5: Develop Draft Comprehensive Plan and
1m lementation Strate ies
Review trans ortation data from SEH.
Review infrastructure data from Ci En ineer.
Begin compiling each section of the Comprehensive Plan
update, including TCAAP components.
Arden Hills Town Hall meeting (if possible, release the draft plan
or ortions of the Ian for ublic view.
Conduct review of plan elements_ Meet with the PTRC, EDC,
Plannin Commission, and Ci Council for draft Plan review.
Release draft 2008 Comprehensive Plan for public comment via
website if read
Workshop #3: Hold open house to present the final draft of the
Plan and seek final input.
Task 6: Seek A rovals and Finalize Plan
Final Plannin Commission ublic hearin and resentation.
Formal Comprehensive Plan update presentation to the City
Council for approvaL
Task 7: Additional Government Review
Submit the Plan to the adjacent governments and school districts
for review and comment.
If necessary, amend the Comprehensive Plan based on the
comments from adjacent units of government and the school
district and seek necessary Planning Commission/City Council
approvals.
Task 8: Submit the Plan to the Metropolitan Council for
A roval
Created.- May 14. 2007. This project work plan is sUbject to change.
2008 Comprehensive Plan Update Work Plan
Timeline
May 2007 June 2007 July 2007 Aug 2007 Sept 2007 Oct 2007 Nov 2007 Dee 2007 Jan 2008 Feb 2008 Mar 2008 Apr 2008 May - Oet 2008 Nov 2008 Dee 2008
._;...
--- ~ + ~ ~ ~ N ~ _.~~.. _ ~ _ ~ ~ _ _ _ _ _ -:_~.__ ~_ ~ ~ _ "' ~_. _"._ __ -r.. _ _ _ ...;.______ __~ _~ _ _ _ .N._ __,_
! ! i i
, , , ,
_... .._n ,. n _ _ _ _ ~ n _ _ _ __ _,_~~_ ~.~_"" __ _ __.. _~._." ~"m. _. .... _ _ ._.... __ _,.__ ~ __ _ ...,..__ _ _ _. _.. _ _ ~ __
. __. _ _ _ _ _ l_ _ .. ___ _I- _ . _ _ _. ~ _ _$___.._ _ _ _ L.. ~ .. ..._. _ _ j_. _ .. J_ n _
,
_J
.1_..
--;...-
.1.
_ ___.. L _ .__ _ _ ___l_ __ _ _ __ ..I.. __ _ _._ _ L__
... _._J_____ _. .._ L_ _ _ _.,. _. J_._
, ,
__1._ ".._.___".l_. '"_. _....____________...
I !
_____,_____'__-,-_-"_n
,
..__L_ __._____.__1._.____..
,
__._ _ .l._._ _._.,__
!
'.--.--.---,-
, , ,
_. _. - - ~ ~ ___ . - __ _.. __n _ .. __._
J.m~
.._.l_._ --.-.--J-
i
00___ __,_
u._uy____
--'1--
i
,
.. . -,..-
"T - --
-...[
~-~u+u----,.-------l._..-n ---+
,
-.}---
o
,
ru-u+- .~---.,..-- ....-
-.!-
" ,
^',. .~__.. - ^' ~_ - - - ...,_ ___ __,-- - - - - ~..,.- - ~ - - nor n _ __ _ _ ..._ ..___ ~ .""" ~"__ _ ~~_._
- - - -- -~ - ~ - ~ - ~ ~ _" - -.._ ~I~._.___ - L- - __ __!_ - ~ - - -1---- - ....-t.... _____.. _~ - - _ - - __ N ~ _. N.J __ _.._ _ _l--..- '00" _ ,.
,
------+-------..~-
" i)
- - ~ - - -,.... -- - -~... - -. - -,. --- - - ~- ->> - ..-<-....--->-- - - --
"._....._-_._--_._-~.._---
. ,
t I
-. ......-.,.--
,
,
,
,
'--'---,'-'.
,
,
,
.. -..., --..
I 1
-_~,_ ------,.--------or- __ - _,_ - -_00
" ,
, ,
, !
I
..--,------ .,.....-
,
.
~ N _'.>> _ _ ~ _ ___..,___~ _ _ ~,--
. ,
, , ,
------j----- t----~i------t_ ----y __uj
, ,
""'._" _.._." oo-j_.'. _..
, , .
.- ~ c,.__ ~ - -r - ~ - ---1- -- - - - ,--- -~ -."
--- -.-!--~-~-f.~..---..J---~- r---~-+-~-~-+~ --~~--"-"-,'--.~.~"
: { ,
.-----r-------l-------,.........
~_. -
- -- --~-!--_. _._--~_.
...-~.~-^.l----~
, i
_____--"-___..__J.___.._'" "
_~___..J...______J__ 00___ _ .,_,_
!
_..___L_ __~ ._100". _. _..l" ~,,__.____.__j_._
, ,
..~.L..*____
I
'_ _N~ _NL. n~ ___-'--__~__-L_ ____ _ __~N __j______
1 1 1 j
------j ---------,-----
---i
.t ----
---1'--
- ,.--- --- - -.T.
. .
-.-.+~--,-~-i---
~~---+---,
- - -- -.;. -- - --- ,-- - - .-- - '----
, ,
- - --- ~ - -- ---i- - - -- -.
,
_____l______L_ ..._ .~_
,
___ 00_ -L 00__ _ _~ ____ J ~_
--~--+---- -~--~~~--_.....
-~..
_~___J_
..___....L__~___
.-. ~.. -... - t -- ---- i- -- ~~- - - ioo- 00 - --00 00 - '-j'"
._~___________~---_----n. ..,_~___
,
----T
-------f-~-~- i '-._',- ~-.
---r------,---
--.ul
,
- ~ - - ~ i - - -- --- i~- - -- ~ - 1--- - -- - T" - -". -- M -- ---- t" - -- - - -1-- - - - -~-
--.----1
,
-----,....-~--~1-~-
" ...L
,
~-.---t--u-+--
. .
_._-~--,------....--
. ,
~
~HILLS
MEMORANDUM
DATE:
June 6, 2007
PC Agenda Item 5.A
TO: Planning Commission
FROM: James Lehnhoff, City Planner
SUBJECT: City Council Planning Case Review Update
The City Council approved one planning case at their May 14, 2007, meeting. A second
planning case was delayed to the June 11,2007, meeting at the request of the applicant.
Plannine: Case 07-011: Site Plan Review; Rob & Jennifer Scott; 4518 Pleasant Drive
This Planning Case was approved on the City Council's consent agenda with the reconnnended
conditions from the Planning Connnission.
Plannine: Case 07-01: Variance: Barbara Muller; 1486 Arden Oaks Drive
This variance request was delayed to the June 11,2007, meeting by the applicant.
Plannine: Case 06-037: Northwestern Collee:e Master Plan Uudate
The City Council's review of the Northwestern College Master Plan update has been tentatively
set for July 30,2007. The College has a completed an EA W for the property, which is currently
open for public review. Electronic copies of the EA W can be obtained via email from James
Lehnhoff.
City of Arden Hills
Planning Commission Meetingfor June 6, 2007
\\Metro-inetus\ardenhills\Planning\Planning Commission\CC Reports\60607 - PC report - CC report.doc
Page 1 of1