Loading...
HomeMy WebLinkAbout02-26-07 Item 4B, Resolution 07-32 DNR Trail Support ~ ~HILLS Request for Council Action Prepared By: Dept.: Council Mtg. Date: Final Action Needed By: Michelle Olson Public Works m.......:.F..br~arj~~~liC February 26, 2007 Agenda Item: 48 ,-.,--,... ..-------Bu-dgeteaAmount~.-_..".:.:.~.=::~_~-- Actual Amount: Funding Source: _ ____..........____ !BplIfiCjL;~Gt(6n:R&g~l~JiEilftJtjf41dmR;g~:ip:~j [Motion fo..a(roPt-~uiIon07~'"~Resojlition-'supp-orting-The--Mi"Il"nesot,iO'N'ffTocaf"fraiC"Connecti'onGrant"'APpii"catio"n-fo-ithe""perry"'pari<"! iRegional Trail Connection. .. r:8~:tf~@'[qmm~1!~I[Qg%1~~'~~3;'tliJfi~ffJKL__________,.,..__..__________.........__..____________........._.,________._'..........".__________________.........._._____________...."'.".._.____________.....,.".....__________._...._.".".~____._.........".___ ;Adopt Resolution 07-32: Supporting the Minnesota DNR Local Trail Connection Grant Application for the Perry Park Regional Trail !Connection. at x No.: 07-22 No.: Recommendation: Recommendation: DNR local Trail Connection Grant Application and Project Map j'AdnWn'f~Iratoiisiaff~~omijlerytS~~Wi;%:fAt~~;m The grant awards are expected to be' announced by July, 2007. -If the Ciiy receives funding. .it is proposed that this project be scheduled in : 2008. . - \\Metro-inet.us\ardenhiIls\PR&PW\Parks\Memos\Council Actions\DNR Grant Request for Action02-26-07.doc ~ ~HlLLS CITY OF ARDEN HILLS COUNTY OF RAMSEY STATE OF MINNESOTA RESOLUTION NO. 07-32 A RESOLUTION SUPPORTING THE MINNESOTA DNR LOCAL TRAIL CONNECTION GRANT APPLICATION FOR THE PERRY PARK REGIONAL TRAIL CONNECTION. WHEREAS, the City Council authorized City Staff at its regular meeting on November 13, 2006 to apply for funding through the Minnesota Department of Natural Resource's Local Trail Connection Grant Program; and WHEREAS, the City of Arden Hills proposes to provide a regional connection to Tony Schmidt Regional Park via a new trail from Perry Park, through Ramsey County Open Space; and WHEREAS, the City of Arden Hills previously contributed $32,000 towards the construction of the railroad underpass trail that will link to the proposed Perry Park trail; and WHEREAS, the City of Arden Hills approved a Comprehensive Parks and Recreation Open Space Plan in 2002 and Updated Strategies to this plan in 2006 that include commitment to the proposed trail and future connections; and WHEREAS, the improvement will benefit the City of Arden Hills, Mounds View School District 621, and Ramsey County; and WHEREAS, the City of Arden Hills is committed to maintain the proposed trail year-round; THEREFORE, BE IT RESOLVED: The City of Arden Hills supports the grant application through the Minnesota Department of Natural Resource's Local Trail Connection Grant Program for a Perry Park regional trail connection and is committed to completing this project if funding is provided. ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS THIS 26TH DAY OF FEBRUARY, 2007. Stanley D. Harpstead, MAYOR ATTEST: Michelle Wolfe, CITY ADMINISTRATOR \\Melro.jnel.us\ardenhills\Admin\CouncH\Resolutions\2007\07-32- Supporting a Minnesot DNR local Trail Connection Grant.doc 2007 LOCAL TRAIL CONNECTION PROGRAM APPLICATION Before completing this application read the program manual that contains instructions on completing this form. GENERAL CONTACT INFORMATION: l. 2. 3. 4. Applicant (Unit of Government required): Contact Person: Contact Title: Mailing Address: City of Arden Hills Michelle Olson Parks and Recreation Manager 5. Daytime Phone: 6. Fax Number: 7. E-mail Address: 8. Website (if available): Street: 1245 W. Highway 96 City, State Zip: Arden Hills, MN 55112 651-792-7848 651-634-5137 michelle.olson@ci.arden-hills.mn.us www.ci.arden-hills.mn.us TRAIL ORGANIZATION PROJECT PARTNER/CLUB (If applicable): 9. Contact Person: 10. Contact Title: 11. Mailing Address N/A Street: City, State Zip: 12. Daytime Phone: 13. Fax Number: 14. E-mail Address: 15. Website (if available): LOCATION OF PROJECT: 16. County Project is located within: 17. State Legislative (House) District: 18. Legislative House Representative: 19. State Senate Representative: 20. Congressional District: 21. Congressional Representative: Ramsey County 50B Kate Knuth Satveer Chaudhary 4 Betty McCollum Page 1 GENERAL PROJECT INFORMATION: 22. Project Title: Perry Park Regional Trail Connection 23. Total Project Amount: $ 38,500 24. Amount Requested: $ 16,747.50 25. Local Match $ 16,747.50 26. What is the source of the local match? The match will come from the City of Arden Hills Park Fund, which is a special revenue fund for Parks and Recreation Construction Projects. 27. Have those funds been secured? [8J Yes 0 No 28. Will other non-local funds be used for this project? DYes [8J No If yes, give amount: $ 29. What is the source ofthe non-local funds? 30. Have those funds been secured? DYes 0 No 31. If this project has received federal funding through the Enhancements Program, please indicate which year your organization is programmed for construction? (please include a copy of the award notification as attachment "F") FFY: 32. Ifthis project is for a new trail development, please indicate estimated length: Feet (ifless than 'is mile): 900 Linear Feet Miles: .17 Miles Page 2 33. Below, please indicate which uses will directly benefit from the proposed project: [gJ WalkinglHiking [gJ Bicycling o Horseback Riding o Cross-Country Skiing o In-Line Skating o Snowmobiling o Other (specify): Page 3 QUALIFYING REQUIREMENTS All applications must address each of the following five qualifying requirements. Failure to provide information on each of the requirements will result in the disqualification of the application. Please complete each section as outlined in the instructions. 34. Project Description: The proposed project is the construction of an eight (8) foot wide bituminous recreational trail that will begin in Perry Park and will provide a local connection to existing arteria] trails that lead to Tony Schmidt Regiona] Park. This proposed link to the trail system will connect Perry Park, a community park which hosts a variety of youth and adult programs and outdoor activities throughout the year, with Tony Schmidt Regiona] Park, which also has a wide variety of activities and amenities. There is currently an unpaved foot path in the location of the proposed trail that does not meet the Americans with Disabi]ities Act (ADA) standards, is not a bikeable path, and is not maintained. Additionally, the path is not able to be utilized during the winter months. The proposed project will improve the grade and cross slope to meet ADA standards and will create a recreational biking and walking trail that can be used year round. This proposed trail will provide a key connection for Arden Hills residents, visitors, and neighbors of Perry Park with Tony Schmidt Regional Park. 35. Costs Associated with the Project: Page 4 TOTAL PROJECT COST ESTIMATE: $38,500.00 Plalli1ed Unit Total Item Quantity Unit Price Amount Mobilization, 5% max 1.00 l.s. $ 1,450.00 $ 1,450.00 Clearing and grubbing 0.15 acre $ 6,000.00 $ 900.00 Bituminous path (8' wide) 900.0 l.f. $ 19.00 $17,100.00 Retaining wall 500.0 s.f. $ 20.00 $10,000.00 Restoration 1.0 l.s. $ 1,000.00 $ 1,000.00 Base Bid Total $33,495.00 Engineering Services $ 5,005.00 --------------- Total Project Cost $38,500.00 Trail signage costs are not included with this project. The Parks, Trails, and Recreation Committee has proposed to the City Council to add signage for all city trails in the year 2008. The matching funds for this project will be taken from the City of Arden Hills Park Fund. This fund is a special revenue fund that is utilized for Park Improvements, excluding maintenance. The primary source for this fund is Park Dedication Fees from new developments and subdivisions. Five Year Operations and Maintenance Cost Estimate: The City is currently completing a comprehensive pavement management program (PMP) inventory of all existing trails. All trails will be evaluated and put on a point system for maintenance purposes. This report will help us to prioritize and schedule maintenance, resurfacing, and reconstruction of all trails. Annual maintenance for this trail is estimated at approximately $1,000. 36. Project Timeline: Design/Specifications: September, 2007 Permit Applications: October, 2007 Bid Process: January, 2008 Award of Bid: February, 2008 Construction Start Date: April, 2008 37. Project Readiness: Page 5 Since this project will be located on City park land and Ramsey County Open Space, no land acquistion wll be necessary. Ramsey County Parks and Recreation is supportive of this proposed trail connection and have concurred that the selected location ofthis trail is an excellent solution to mimimizing the impact on the land. Attachment C includes a letter from Greg Mack, Ramsey County Parks and Recreation Director stating their support of this project. Preliminary plans and cost estimates for this project have been completed to date. Ifthe project is selected, final plans and specifications, advertisement for bids, and contract award will be completed in a timely manner for spring 2008 construction. A permit from Rice Creek Watershed District will also be required. The City Council is committed to completing the project ifthe City is selected for funding. Attachment B icludes a signed resolution from the City Council dated February 26,2007. 38. Year Round Trail Usage: The current unoffical and unpaved foot path that exists in this area has a very steep grade and therefore, it is not passable in the winter. The proposed improvements to the trail will allow for year round use and maintenance. The City of Arden Hills will remove snow during the winter months. Walkers, hikers, and bikers will have the ability to utilize this trail as well as the existing links to Tony Schmidt Park year round. EVALUATION CRITERIA All applicants must address each of the following six evaluation criteria that are listed, and in the order that they are presented below. Failure to provide information on each of the criterion will result in the disqualification of the application. 39. Site and Project Quality: This proposed trail is a key component within the Ramsey County's Tony Schmidt Master Plan (Attachment G). This proposed trail will link Perry Park (picnic pavilion rentals, various youth and adult outdoor activities) and Tony Schmidt Regional Park (three playground structures, picnic pavilions, swimming beach with lifeguards, boat access, trails, fishing docks, special events). The Tony Schmidt Master Plan proposes to extend the existing trail from Tony Schmidt Regional Park through Ramsey County Open Space all the way to Mounds View High School. The proposed Perry trail is a beginning point for a local connection to get to Tony Schmidt Regional Park. Future trail connections to the City's Elmer L. Andersen trail (shown on Attachment H: City of Arden Hills Parks and Trail Map) are planned, which currently connects two other city parks, Hazelnut Park and Sampson Park. These trails will then connect to Cleveland Avenue and County Road D, providing connections to the City of Roseville trail system. In 2006, Ramsey County Parks and Recreation constructed a railroad underpass trail from Tony Schmidt Park to existing arterial trails that lead to the proposed trail location. The City of Arden Hills contributed funds for the construction of this underpass. The proposed recreational trail is a missing link to connect Tony Schmidt Regional Park with Perry Park. The existing arterial trails pass under working railroad tracks and navigates through a natural and scenic area of Arden Hills. The proposed trail will be located within a beautifully wooded, naturally vegetated, and open space area. Page 6 40. Accessibility: Currently, this area is utilized by walkers who have created an unofficial, unpaved path. However, it has an extremely steep grade and is not accessible to persons with disabilities. The proposed trail will be constructed with a grade and cross slope that is in compliance with Federal ADA regulations. This proposed trail is the missing link to a fully accessible/ADA compliant recreational trail connection from Perry Park to Tony Schmidt Regional Park. The existing arterial trails leading through the railroad underpass and to Tony Schmidt Regional Park are all accessible to people with disablitities. After a field visit and evaluation of the site, staff determined a location to construct a trail that would allow us to meet ADA requirements. The grade in Perry Park is extremely challenging and therefore, the route chosen is the most feasible location. 41. Public Need for and Benefit of Project: This proposed recreational trail is a missing link to a key regional connection within Arden Hills and Ramsey County. The trail will provide an aesthetically pleasing experience for all those who utilize it. Both Ramsey County Parks and Recreation and the City of Arden Hills continue to be proactive in developing a comprehensive trail network. Ramsey County recently completed a Regional Trail Network Vision (available on their website at www.co.ramsey.mn.us). Their vision is to create a network of regional trails that provide safe pedestrian and bicycle transportation routes linking communities and neighborhoods within and adjacent to Ramsey County. The proposed trail from Perry Park to Tony Schmidt Regional Park is one link that will add to this network vision. The existing unofficial (unpaved) foot path has a very steep grade and does not provide a safe passage from Perry Park to Tony Schmidt Regional Park. Currently, the grade is difficult to climb. Walkers and hikers can easily lose their footing and slip or falL Bikers and persons with disabilities are unable to utilize this unofficial foot path. The proposed trail will resolve this safety issue by constructing a trail with a solid, smooth surface and an improved grade. The proposed recreational trail will not only provide a safe regional connection, but will also provide safe year round recreation use for walkers, hikers, and bikers. Ramsey County recently finished construction of the Tony Schmidt Underpass trail that leads to the proposed trail location. The Tony Schmidt Regional Park Master Plan has recently been completed and numerous future improvements have been identified. The timing to construct this trail would be ideal in the near future, in order to establish this regional connection. The City of of Arden Hills has a Comprehensive Parks, Trails, and Open Space Plan that includes a long list of trail and park improvements and developments. The funding for park and trail projects has become challenging due to lack of funding. The City of Arden Hills is almost completely developed. Therefore, our Park Fund has a depleting balance and alternative funding sources must be explored in order to complete the City's vision. 42. Community Commitment to Trail Use: Page 7 In 2002, the City of Arden Hills completed a Parks, Trails, and Open Space Plan, which is available on the City's website at www.ci.arden-hills.mn.us.This plan recognizes that Arden Hills is divided by many major roads, highways and railroads. These transportation corridors provide excellent regional vehicular access and mobility, but they separate neighborhoods and pedestrians from parks, schools, libraries, and recreation. Trail connections are needed to tie the City together, create a comprehensive system of parks and trails, improve safety and enhance the sense of community. Since 2002, the City of Arden Hills' Parks, Trails, Recreation Committee has been in the process of updating its comprehensive plan, and has prioritized identified trail linkages within the city that are proposed within the next twenty years. In November of2006, the Arden Hills City Council approved a Vision and Strategies for Parks, Trails, Recreation, and Community Building (also available on our website). This vision states: Parks and Trails in Arden Hills enhance the health and well being of citizens, improve the value of citizens' property, and increase the desirability ofthe city as a place to live or work. The City's parks and trails comprise a coherent network that: *Provides land and water-based recreation, as well as convenient and safe access to parks, trails, and recreation facilities in the region; *Develops and maintains a system of neighborhood parks and trails; *Encourages non-motorized transportation and commuting; *Supports and encourages access to lakes, marshes, and wooded areas; *Provides connections between the portions of Arden Hills south of Highway 96 and new development to the north, as well as among other neighborhoods separated by roads; *Provides important resources to schools, colleges, employers, and other organizations in the region; and *Strengthens community among citizens. This vision can only be achieved with the leadership of the City Council and the support of the community. This leadership and support are critical to generating the financial resources necessary to develop, operate and maintain Arden Hills' parks and trails. The Comprehensive Plan and Strategies address trail segments that are needed to connect the community to parks, schools, libraries, and recreation. The proposed trail from Perry Park to the existing trails leading to Tony Schmidt Regional Park is listed as a top priority (trail #2 of Strategies) within those strategies. Ramsey County Parks and Recreation recently completed the trail from Tony Schmidt Regional Park under the railroad tracks (underpass), connecting to an existing arterial trail that leads to the proposed Perry Park trail to the southwest and to County Road E2 to the north. As part of the Tony Schmidt Master Plan, the County has proposed to extend this trail from County Road E2 into Ramsey County Open Space, past the Arden Hills Library to Mounds View High School (see attachment G: Tony Schmidt Development Map), once again connecting parks, schools, libraries, and recreation within our community. Completion of these trail connections will demonstate the City's and County's commitment to providing safe links for biking and walking opportunities in our communities. Page 8 43. Impact on Adjoining Landowners in the Vicinity ofthe Project: The City park land and open space in this area provides a beautiful recreational experience for all trail users. The proposed trail will have no negative or adverse impact on adjoining landowners, since it will be constructed entirely on City Park land and Ramsey County Open Space. The neighbors surrounding Perry Park will be positively impacted with the addition of this trail. The proposed trail will improve an already existing unofficial foot path that is hazardous and not maintained. The proposed trail will positively impact the City and regional area by providing a safe, maintained, and accessible link to Tony Schmidt Regional Park as well as recreational opportunities to residents and visitors. The Parks, Trails, and Recreation Committee, which is comprised of Arden Hills residents, is strongly in favor of this traillinlc The Committee has listed this trail link within the City's Strategies for Parks, Trails, Recreation Community Building as a top priority to be completed as soon as possible. 44. Attention to the Potential Environmental Impact of the Project and Efforts to Avoid or Mitigate Adverse Effects: Page 9 To determine the location ofthis trail, we considered the following information: 1. Obstructions within the area. 2. Topography of the area. 3. Purpose ofthe trail. 4. Impacts to residents and wildlife. As a result of this analysis, staff recommends that the pathway navigate through both City park land and Ramsey County Open Space. Initially, staff considered an alternate location for this trail, which was the most direct route leading up to Perry Park. However, constructing the trail in this location would have included extensive removal of significant trees and disruption to wildlife. The project would have also required numerous retaining walls, stairs, switchbacks, alternate additional routes for ADA accessibility, and significant grading and excavation. Due to these significant impacts, the currently selected location would be preferrable. The selected location is unfortunately not a direct route, but is in an area that will pose the least negative impact. The grade in this area can be brought to ADA standards with few complications. The proposed trail goes through a wooded and open space area which is already an unofficial, unpaved, and unmaintained foot path. The purpose ofthis trail includes: I. Providing a safe connection from Perry Park to Tony Schmidt Regional Park; 2. Providing a recreational trail for individuals of all abilities; 3. Encouraging alternative modes of travel; 4. Building exercise into daily life; and 5. Moving forward in fulfilling the City of Arden Hills' comprehensive trail system VISIOn. The construction of the proposed trail will require some additional grading to match existing slopes. However, these areas could potentially be constructed as rain gardens or other landscaping features that enhance the beauty of the trail. As required by the grant, restoration of disturbed areas will involve the use of native plants and other vegetation, and will be incorporated in the design and project documents. Page 10 ATTACHMENT CHECKLIST Required ~ Attachment A - Required Certifications ~ Attachment B - Resolution Supporting Application ~ Attachment C - Letters of Support ~ Attachment D - Project Location Map (8 Yz X I I) ~ Attachment E - Site Level Map (8 Yz X I I) o Attachment F - Enhancement Award Letter (optional) Send five copies ofthe application to the following address: Traci Vibo, Grant Coordinator Department of Natural Resources Trails and Waterways Division 500 Lafayette Road, Box 52 St. Paul, MN 55155-4052 Phone: (651) 259-5619 Page 11 , " ~H . ~ i " " -i~ " , ~lL JHh ~ .P~~ ~ ~;: ~: ~ J~giP HUH ~~~H~ -c .2 ~ " " . E .~ ~ 2: ~ ~@. _ ~ 'ii : Jg _ <: C 01 dl ~ ~ ~ ~ ~ ~ .... iJ" iJ" iJ" I~ ~ ~ ~ c: o +:; (.) CI) c: c: o o .- ltl ... .ll::1- ... ltl a. ~ ~.2 ... Cl CI) CI) 0.0::: :'l .. ~wiE d h z ~o~o" iil l~ r'~ ;j]~ c