HomeMy WebLinkAbout01-29-07 Item 7E, Resolution 07-27 Feasibility Report Prep Order
~
~HILLS
Request for Council Action
Prepared By:
Dept.:
Council Mtg. Date:
Final Action Needed By:
_ ~ristine__~i_ga
Engineering
1/29/07
1/29/07
4;/
Agenda Item:
7E
Budgeted Amount
Actual Amount:
Funding Source:
$0
$144.060
.. - Various
9ounc:ilAction:l3equ_~t:_ /_': ''____, ___ _____ _______m_____"" ,,_.".____m_m__m_______
Adoption of Resolution 07.;J1 Ordering Preparation of a Feasibility Report for Asbury' Avenue and Ridgewood Roac(from'tity limits to
Glenhill Road.
Approval of Construction Agreement with the City of Roseville.
Staff Recommendation:
Adopt Resoil.ltion- oi-;(10rderingp'reparationofa Feasibiiity 'Re'port-fornAsbury'"j),venue ancJ' Ridgewood--Roa"d-from City -'imits" to 'Glenhill
Road.
Approve Construction Agreement with the City of Roseville.
Planning:
Supporting. DocuiOentS-: '(-eiit?,(;fl€@)
Memo/Letter:
x Resolution No.: 07~~
Ordinance No.:
x Engineering Recommendation:
Attorney Recommendation:
x Other:
Letter from the City of Roseville; Construction Agreement
Fi-nancial'.'impliciiij6~:
-A,drTl-inistratorjSta'ff~mmehts:-
.
~
EN HILLS
MEMORANDUM
DATE:
January 25, 2007
AGENDA ITEM 7.E
TO:
Mayor and City Council
Michelle Wolfe, City Administrator
Kristine Giga, Civil Engineer ~
FROM:
SUBJECT:
Order Feasibility Report for Asbury Avenue and Ridgewood Road
from City limits to Glenhill Road
BACKGROUND
The City of Arden Hills has received a request from the City of Roseville regarding its next area
for street reconstruction, the Asbury Avenue! Ridgewood Road neighborhood (Roseville's
"Neighborhood 10"). City limits are midblock; some properties are even divided by the border.
Roseville would like us to consider the option of extending their project up to Glenhill Road,
which would include approximately 300 feet of Asbury A venue and 400 feet of Ridge wood
Road located within Arden Hills. A letter with this request is attached.
DISCUSSION
While the Arden Hills segments of Asbury Avenue and Ridgewood Road are in better condition
than the Roseville segments, and there are streets in worse condition in the City, there are
advantages to extending this project to include the entire block.
· The residents along the block would only be inconvenienced once for the reconstruction of
their street, rather than twice, if projects are completed by each City at different times.
. Residents from both cities would be able to meet and be involved in decisions that would
affect the entire street.
. A more comprehensive storm sewer design could be achieved, since part of the street in
Roseville drains north into Arden Hills.
. Given the close proximity of this neighborhood to the proposed 2008 PMP, this would be
another good candidate for combining projects in an effort to reduce construction costs by
creating a more lucrative project for contractors.
\\Metro-inet.us\ardenhills\PR&PW\Engineering\2007\Council_ Actions\ I -29-07_ Memo _ OrderFR _ RVN I OExtension.doc
"
1/25/2007
Page 2
FINANCIAL IMPLICATIONS
Estimated costs for these segments are approximately $144,000, which includes some funding
for storm sewer improvements that will be needed. While the estimated costs for the 2008 PMP
exceed the $1 million guideline, 2007 and 2009 projects are estimated at less than $1 million,
creating a balance over three years.
Since this is a joint project, the City of Roseville will provide engineering services, estimated at
15% of the project costs. This is included in the estimate stated above. Because this is outside of
the scope of the Joint Powers Agreement, a separate construction agreement is necessary. A copy
of this agreement is attached.
RECOMMENDED COUNCIL ACTION
It is recommended that the Council authorize preparation of the feasibility report and approve the
construction agreement with the City ofRoseville for the proposed improvements.
,
~
~HILLS
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
RESOLUTION NO. 07~'l
A RESOLUTION ORDERING PREPARATION OF FEASIBILITY REPORT
FOR ASBURY A VENUE AND RIDGEWOOD ROAD FROM CITY LIMITS TO
GLENHILL ROAD
WHEREAS, it is proposed to improve the following streets: Asbury A venue and
Ridgewood Road from City Limits to Glenhill Road, and to assess the benefited property
for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes,
Chapter 429,
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF ARDEN
HILLS MINNESOTA:
That the proposed improvement be referred to the Asbury Avenue-Ridgewood Road
Improvements for study and that the City Engineer is instructed to report to the council
with all convenient speed advising the council in a preliminary way as to whether the
proposed improvement is necessary, cost-effective, and feasible and as to whether it
should best be made as proposed or in connection with some other improvement, and the
estimated cost of the improvement as recommended.
ADOPTED BY THE CITY COUNCIL OF THE CITY OF ARDEN HILLS
THIS 29th DAY OF JANUARY, 2007.
Stanley D. Harpstead, Mayor
ATTEST:
Michelle A. Wolfe, Administrator
January 18, 2007
Michelle Wolfe
City of Arden Hills
] 245 West Highway 96
Arden Hills, MN 55112
RE: Street Reconstruction Project
Neighborhood 10: Ashury Street, Snelling Avenne to City Hmits
Ridgewood Road, Asbury Street to City Limits
Dear Ms, Wolfe:
The City of Roseville originally proposed the reconstruction of the streets in Neighborhood 10 in 1998.
This project was postponed by the City Council in 1998,200] and 2004. The reconstruction of these
streets was put ofT with the idea that we would pursue a joint project with the City of Arden Hills, Most
of the streets in the Arden Hills section of this neighborhood are in adequate condition and the Capital
Improvement Plan schedules this neighborhood for reconstruction after 20] 2, At this time, the streets in
Roseville are in much worse condition than the Arden Hills segments and we are concerned about the
continued cost to keep these streets passable for 6+ years.
Each spring and tall, Rose"ille staff repairs the streets to ensure that they will hold together for another
season, We estimate that since 1998 it has cost the City approximately $40,000 to keep these streets
patched. This is a significant portion of the estimated cost to reconstruct the roads, As you know, these
spot repairs do nothing to decrease the cost of reconstruction, ]n the interest of a more permanent
solution to the deteriorating condition of these streets, the City Council has ordered the preparation ofa
feasibility report to consider the reconstruction of these streets in 2007,
In December we met with the Roseville property owners regarding this project. There was support for
the proposed street reconstnlction; however, some of that support is conditional. Some of the neighbors
at the meeting expressed SUPPOll only i I' a more comprehensive project was pursued with Arden Hills,
To this end, we would like to work with you on extending this project into Arden Hills and delaying it to
2008 to allow for time to design the portion of the project in your City. The joint project would only
extend the project thc Glcnhill Road with Roseville doing the engineering and plan development for the
project.
I understand that Arden Hills has many street reconstruction needs throughout the city, There arc some
advantages in pursuing a joint project these are:
. ;\ joint project will reduce inconvenience for both Roseville as well as Arden Hills Residents, the
homeowners on Ridgewood and Asbury would only have to deal with the dust and noise of
reconstruction for one construction season.
. The properties at 3 I 20 Asbury Street & 3121 Ridgewood Road straddle the City boundary, Two
separate projects would mean two separate assessments within 10 years of each other. Each of
~~()6(J Cl'.'K C_'ntcf Dnn: ..) Rllscdk, '\1imws,>u. ~~Sl j 3
(;5- 1. ~\)2.RUSE ..;. TDD (~5j_"7:)2-.;f;r:l "':. \\"v"w.cLf();;'c\-Jlk.mll,D_~
Rrc,dn! 1'''1''_''
p<l~t.(";1~'.:m{"r c,nr.nH
these properties could havc the curb end in the middle of their from yard. These owners have
expressed eoneems about this.
. Because of the existing topography. the north portion ofthe neighborhood drains to Arden Hills.
We are proposing to construct raill gardens or infiltration trenehes ill the boulevards of the homes
in Rosevi!le to collect and intiltrate the storm water. However. a portion of the HmofTwill still
drain down the hill into the Arden Hills system. When Arden Hills reeonstructs the portion of
the strects in thcir City. the storm sewer system will be constructed to address the runolffrom
Rosevillc. By having one project we would be able to have a more comprehensive stonn sewer
design. Meeting the water quality goals of both of our Cities.
. \Vith a larger project we may see some cost savings on construction costs. The 2007 project
consists entirely of 1\'lill and Overlay projects. With Mill and Overlay projects. the quantities of
curb and gutter and storm sewer are lower than in a reconstruction project. With lower
quantities. the bid prices may not be as compctitive. If we pursue a joint project. we would
combine it with Arden Hills 2008 Reconstruction project.
. lfwe just end at the middle of the streel. Arden Hills will see additional costs "matehing" a later
project in with the RoseviIle streets. This could include removing new curb and milling the new
pavcnlent for a smooth transition.
. By not involving the Arden Hills residents they are not a part of the decision making process.
'!1,ings like street width. parking. curb typc arc all decisions that the Roseville residents have
weighcd in on. If we do not include Arden !Jills property owners in the discussion. they will be
"stuck" with our decisions.
We are holding a Public Hearing for this project on 1/29/07. At the hearing we are prcsenting two
options to the City Council. The first option would be to continue with a 2007 reconstruction projeet,
this project would only reconstruct the roads in RoseviIle. The second option would be to delay the
projeet to 2008. Allowing us time to work through the public process in Arden HiUs and have the
potential for an early 2()(l8 bid. StafT is recommending the second option.
Moving forward with extending th" project would require the Arden Hills City Council to order a
feasibility report. We would appreciate it if you could you discuss this option with the City Council at
the January work session. It would be our hope that if they are supportive. they could order a Icasibility
report at the 1/29/07 meeting. Iflhat occurs_ we could start a public process this spring inviting
residents from both Arden Hills and Roseville to the table. If approved we would pursue a 2008
reconstruction project.
We appreciate the consideration of our request. Please contact me at deb.bJoomfw.ci.roseville.mn.us or
651-792-7042 with any questions or concerns.
Sincerely.
~~
Debra M. Bloom. P.E.
City Engineer
CONSTRUCTION AGREEMENT
2008 Reconstruction Project
This Agreement is made on , between the City ofRoseville, a
Minnesota municipal corporation ("Roseville"), and the City of Arden Hills, a Minnesota
municipal corporation ("Arden Hills").
1. PURPOSE
Roseville and Arden Hills (Collectively the "Cities") have determined that it is in the best
interests of the residents of each city to undertake in a cooperative fashion their 2008
Reconstruction Project (the "Project"). The goal of the Cities is to provide for a coordinated cost
effective completion of the Project and the associated benefits of economy of scale. The purpose
of this agreement is to set forth the terms governing the design and construction of the Project.
2. PROJECT
2.1 The Project shall consist of the facilities identified in Exhibit A hereto, subject to
modification as provided herein.
2.2
hereof.
The costs of the Project will be paid by the Cities as provided in Section 5.1
3. DESIGN
3. I Roseville, will prepare, or have prepared, engineering drawings, specifications
and construction plans for the Project. The construction plans will include a cost estimate. The
final cost estimate will include all costs associated with the Project as well as a contingency
budget for unforeseeable circumstances associated with the construction. Roseville will comply
with any requirements of Minnesota law with respect to approvals of such plans and
specifications.
3.2 Construction plans, engineering drawings, specifications and cost estimates will
be submitted to each city for the approval of each city council.
4.1 CONSTRUCTION
4. I If final construction plans and specifications are approved by each city council,
Roseville shall proceed with construction of the Project. Roseville will advertise for bids in
accordance with the requirements of the municipal contracting law.
4.2 Prior to awarding construction contracts Roseville will review the bids received
with Arden Hills. If the contracts exceed the cost estimates contained in the construction plans
(including a contingency budget) previously approved by the Cities, the bids must be approved
by each city councilor the project may not proceed.
4.3 Roseville will be the contracting party and will use ordinary and prudent efforts to
require that the Project is constructed in compliance with approved plans and specifications and
completed with reasonable promptness.
4.4 Roseville will notify Arden Hills of any change order which increases the cost of
any individual construction contract for the Project by more than $5,000 of the original amount
thereof or which materially changes the scope of the Project. Roseville shall obtain the written
authorization of Arden Hills prior to approving such a change order. However, prior written
authorization is not necessary if the change order presents imminent health/safety issues making
prior authorization impractical. In such cases, the change order shall be reasonably presented to
Arden Hills for ratification. Arden Hills must not unreasonably withhold its consent to change
orders resulting from unforeseen circumstances arising from the construction.
5. PAYMENT OF COSTS OF PROJECT
5.1 All costs of the Project will be paid for by the City where that portion of the
project is located in.
5.2 All invoices or requests for payment will be approved and paid by Roseville.
Within 10 days of the end of each calendar month, Roseville shall provide a statement to Arden
Hills showing the prior month's activity, the invoices received and the amount Arden Hills owes
to Roseville for the Project. Within 30 days of the receipt of that statement, Arden Hills shall
pay that amount to Roseville or provide in writing a list and explanation of any amounts it
disputes and pay the undisputed amount. Any disputes regarding payment shall be resolved
through the dispute resolution process contained in Article 7 hereof.
5.3 If this Agreement is terminated under Section 8 hereof, both cities shall
nevertheless be liable for the payment of their cost share which is incurred up to the date of
termination of this Agreement, or as a result of termination of this Agreement.
6. SERVICES TO BE PROVIDED BY ROSEVILLE
6.1 Roseville will provide qualified engineering employees to for the work described
as the project as discussed in the joint powers agreement for the City of Arden Hills part-time
utilization of City ofRoseville engineering employees
7. DISPUTE RESOLUTION
7.1 If a dispute arises between the Cities regarding this agreement or the construction
of the Project, the City Manager and City Administrator of each city, or their designees, must
promptly meet and attempt in good faith to negotiate a resolution of the dispute.
7.2 If the Cites have not negotiated a resolution of the dispute within 30 days after
this meeting, the Cities may jointly select a mediator to facilitate further discussion.
7.3 If a mediator is not used or if the Cities are unable to resolve the dispute within 30
days after the first meeting with the selected mediator, the dispute shall be adjudicated in civil
court.
-2-
,
8. GENERAL PROVISIONS
8.1 All notices under this agreement must be delivered personally or sent by first
class mail addressed to:
If to Roseville:
City Manager
City of Roseville
2660 Civic Center Drive
Roseville, MN 55] 13
If to Arden Hills
City Administrator
City of Arden Hills
]245 West Highway 96
Arden Hills, MN 55112
or addressed to such party at such other address as such party shall hereafter furnish by notice to
the other party.
8.2 This Agreement shall terminate if either City fails to approve the construction
plans for the Project.
8.3 This Agreement may be amended only in writing, executed by the proper
representatives of each city.
8.4
This Agreement must be interpreted under the laws of the State of Minnesota.
Date:
CITY OF ROSEVILLE
By:
Its Mayor
And:
Its City Manager
Date:
CITY OF ARDEN HILLS
By:
Its Mayor
And:
Its City Administrator
-3-
,-
EXHIBIT A
THE PROJECT
Reconstruction of the following streets: Asbury A venue and Ridgewood Road, City limits to
Glenhill Road.
Utility maintenance and/or improvements, as necessary, including, but not limited to, water
main, sanitary sewer and storm sewer.
\ \metro-inetus\Roseville\PublicW orks\Engineering\Projects\2008 _ Pro.jeclS\C ontractagreemenl -- ArdenHills.doc
A-I