Loading...
HomeMy WebLinkAbout12-10-07 Item 4C Civil Eng Tech Support Contract ~ ~HrLLS Request for Council Action Prepared By: _-,<.ristine G!Q~__ Oept.: Engineering Council MtQ. Date: -------..----i2Hoioi-----...-.-.- Final Action Needed By:i2iioioi.. Agenda Item' 4.C. S-udgeted Amount: Actual Amount:- . uU-$O uu _.--uu$O Funding ! IYIU~IVII to Authorize Staff to Contract with WSB & Associates, Inc. to Provide Civil Engineering Technical Support for the Redevelopment of i the TCAAP property. Staff to Contract with WSB & Associates, Inc. to Provide Civil Engineering Technical Support for the Redevelopment of the I ""'1'V'\.r x '''o~n'' oHo. Dated December 6, 2007 from Kristine Giga, Deb Bloom and Greg Haag - I;;:, ,',,", No.: iV' u" 'o"co No.: ........ Recommendation: Recommendation: x I Other: Proposals from Kimley-Horn, SRF, URS, and WSB ~ ~ EN HILLS MEMORANDUM DATE: December 6, 2007 AGENDA ITEM 4.C. TO: Mayor and City Council Michelle Wolfe, City Administrator Kristine Giga, Civil Engineer ~ Deb Bloom, City Engineer Greg Hoag, Public Works Director FROM: SUBJECT: Motion to Authorize Staffto Contract with WSB & Associates, Inc. to Provide Civil Engineering Technical Support for the Redevelopment of the TCAAP property BACKGROUND The City of Arden Hills approved an engineering consultant pool on August 27,2007 for use on specialized proj ects or projects that the City of Roseville' s Engineering Department may not have the capacity to assist with. As part ofthe TCAAP redevelopment, the Developer will be preparing engineering plans, reports and other documents for City staffto review. While the City ofRoseville Engineering Department will be able to perform much ofthe review, staff feels that it will be beneficial to have a consultant on board to provide additional support for review of more technical aspects of the redevelopment, such as overall water and sanitary sewer system capacity analysis. Therefore, a request for quotes was submitted to the City's planning pool, consisting ofthe following firms: Kimley-Hom and Associates, Inc., SRF Consulting Group, Inc., URS Corporation, and WSB & Associates, Inc. All four firms provided quotes for the proposed work. DISCUSSION The support to be provided with this contract includes, but is not limited to: review oftechnical documents such as water system plans, sanitary sewer layouts, traffic analyses, storm sewer plans. Meetings with City staff will occur on an as needed basis. Staff estimates that an average \\Metro~inet.us\ardenhins\PR&PW\Engineering\2007\Council_ Actions\12-1 Q-Q7Memo _ TCAAPsupport.doc 12/6/2007 Page 2 of approximately four (4) hours a week will be needed to provide technical support on an as- needed basis. This contract will be on an hourly basis based on actual hours spent providing support, and shall continue through March 31, 2008, the duration ofthe Preliminary Development Agreement (PDA). At that time, the contract may be extended as needed. Based on the review of the submittals, staff is recommending that the City contract with WSB & Associates, Inc. for this work. WSB provides services to governmental agencies only and has never worked for private developers; this will ensure that the City's interests are well represented. WSB also provided the most comprehensive proposal including a diverse team of staff members available to assist the City. Some of their staff members have experience with TCAAP, having worked on clean-up efforts on the site with past employers, as well as working on groundwater aquifer clean-up efforts in neighboring cities. The hourly rates, when compared with the other fInns, were lower overall; some of the miscellaneous expenses are incorporated into the hourly rate, as opposed to the other fIrms, who bill these separately. In order to become more familiar with the redevelopment of TCAAP, WSB has reviewed some of the preliminary documents for the project. They have indicated that they will continue to do so on their own time, so as to provide the City better service without increasing costs. The proposals are also attached for your review. RECOMMENDED COUNCIL ACTION Motion to Authorize Staff to Contract with WSB & Associates, Inc. to Provide Civil Engineering Technical Support for the Redevelopment ofthe TCAAP property. ", ~~ HILLS November 27,2007 Ms. Kristine Giga, P.E. Civil Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 Re: Proposal to Provide Technical Support for the Twin Cities Army Ammunition Plant (TCAAP) Dear Ms. Giga: Weare pleased to submit this proposal to provide technical support in the form of developer reviews for the planned redevelopment of the 585-acre Twin Cities Army Ammunition Plant (TCAAP) site. We understand that the City is seeking a consultant to review technical documents on an as- needed basis. City staff estimates an average time commitment of approximately four hours per week through the end of March 2008, at which time the contract may be extended through the preliminary design stage ofthe redevelopment. Project Understanding With the Framework Vision for the TCAAP redevelopment in place, we understand that the TCAAP Master Planning process kicked off in January ofthis year. Stakeholders include the master developer, CRR, LLC, the 16-member TCAAP Master Planning Advisory Group, the Planning Commission, City Council, staff, as well as the nearly 10,000 residents of Arden Hills. Once the Master Plan is completed, we understand the importance of ensuring that the developer-designed improvements implement the vision set forth in the Master Plan, are consistent with the design guidelines established during the Master Planning process, and will result in sustainable public infrastructure. The Kimley-Horn team has the knowledge and experience to provide the technical support the City of Arden Hills needs through all design phases of the TCAAP redevelopment process. ~=~ Kimley.Hom and Associates, Inc. -A~HILLS Kimley-Hom has strong working relationships with other consultants currently working on the TCAAP site. We have recently worked with the developer's planning consultant, Hoisington Koegler Group, Inc., (HKGi) on other local development/redevelopment projects in Maplewood and Chanhassen. We are currently working with the City's environmental review consultant, Barr Engineering, on projects in the Northwest Quadrant area of New Brighton and on projects for the City of Inver Grove Heights. Technical Reviews We understand that the City is seeking a consultant to review technical documents including water system plans, sanitary sewer layouts, traffic analyses, and storm sewer plans. The Kimley-Hom teams brings to the City of Arden Hills solid experience in each of these areas as represented in our individual staff resumes included in the Statement of Qualifications submitted this past June as well as the attached project examples. As a part of water system plan review, we would verify that the developer's design meets current City of Arden Hills and Department of Health standards, provides adequate looping and water main sizing, includes valves at appropriate locations for system operation and isolation, and incorporates adequate hydrant spacing to ensure fire protection standards are met. When reviewing sanitary sewer system layouts, we would ensure that the design complies with current City and Metropolitan Council Environmental Services (MCES) standards. Through providing redevelopment services to other local communities, we understand the need to coordinate with MCES when providing new connections to or modifying flows contributing to the MCES collection system. We also have experience in the preparation of Comprehensive Sanitary Sewer Plan updates as may be necessary to address additional flows generated by new development/redevelopment. Traffic analysis and construction plans would be reviewed to verify consistency with the AUAR as well as applicable City, Mn/DOT, and County standards and policies. These reviews are recommended for any site specific traffic impact studies, Intersection Control Evaluation reports, and site development or roadway construction plans. Our staff will review the methodology used in the traffic analyses to make sure reasonable traffic growth rates, trip generation, and analysis inputs are used to ensure appropriate mitigation measures are recommended and implemented. Site lIII"""l_n Kimley-Hom 1lIo...I_ U and Associates, Inc. ~~.HILLS development-plan review will help ensure that adequate parking stalls, site circulation, and proper access layout and locations are incorporated as a part of the development. Review of roadway plans are recommended to make sure that appropriate standards are followed for intersection design (unsignalized, roundabouts, or traffic signals), signing and striping, and construction traffic control. Our strong relationships with Mn/DOT and Ramsey County allow us to assist with any agency coordination that may be required. We understand the impact a poorly designed storm drainage system can have on any project, particularly a redevelopment project. When reviewing developer plans for storm water collection systems, we would ensure that any proposed systems fit within the overall hydrologylhydraulics of the surrounding area. Through several recent projects within the Rice Creek Watershed District (RCWD), we have built a positive working relationship with Watershed District staff. We have also developed a strong understanding ofRCWD permit requirements, specifically as they pertain to site redevelopment and reconstruction projects. Finally, we would ensure that the designed storm water system is consistent with current City standards. Project Team The Kimley-Horn team has significant local experience in municipal infrastructure design and redevelopment, including the redevelopment of contaminated industrial sites, and has provided developer review services for a number of Twin Cities metro-area communities. Project Manager Beth Engum has a variety of experience in the design and management of public infrastructure proj ects. Client Manager Jon Horn brings over 18 years oflocal experience leading complex, multi-disciplined planning and engineering projects. This core team will be backed by the more than 50 local professionals that make up the Twin Cities office and supported by the depth of experience of 2,700 Kimley- Horn employees across the country. We have included short summaries of our teams' qualifications and experience. Full resumes for core team members were included in our Statement of Qualifications. Beth will serve as the lead contact responsible for the management and administration of the project with the City. As Client Manager, Jon will ensure that the City's needs are met by providing his expertise to Beth and being available to attend meetings with City staff, developers, developer consultants, regulatory agencies, and the City Council as appropriate. ~=~ Kimley-Hom and Associates, Inc. oraw -A~HILLS for the Twin Cities Army Ammunition Plant (TCAAP) Primary members of the Kimley-Hom team are as follows: Beth Engum, P.E. Project Manager Beth has more than eight years of experience in municipal and transportation engineering for a wide range of projects including the design and rehabilitation of roadways, drainage/storm water management, and utility improvements for a variety of clients. Beth has a Bachelor of Science degree in Civil Engineering from the University of Minnesota as well as a Master in Engineering Management from George Washington University. Beth has served as the project manager for several local infrastructure improvement projects, including Northwest Quadrant Redevelopment projects for the City of New Brighton. Beth will be the proj ect manager and have day-to-day responsibility for review of technical documents, completion ofproject deliverables, and communication with City staff and other project stakeholders. For this work, Beth's hourly rate is $125.00. Jon Horn, P.E. Client Manager Jon has more than 21 years of diverse engineering, planning, and project management experience. Jon has a Bachelor of Science degree in Civil Engineering from North Dakota State University. Jon has played an integral role in the success of numerous, large-scale development/redevelopment projects for the communities of Chanhassen, New Brighton, Anoka, Maplewood, Bumsville, and Inver Grove Heights by providing not only quality design and project management, but also developer review services and public involvement expertise. Jon will provide technical support and quality control review of all deliverables under this contract. Jon will also serve as a secondary point of contact for the City. Jon's hourly rate is $170.00. Brandon Bourdon, P.E. Traffic Analysis & Review Brandon has more than ten years of experience as a transportation engineer specializing in traffic studies, operational analysis, and the design of traffic signals, signing and striping, and construction traffic control and phasing. Brandon has a Bachelor of Science degree in Civil Engineering from South Dakota School of Mines and Technology as well as a Master of Science in Civil Engineering from the University of Colorado. Brandon has worked for a variety of clients on traffic studies and design projects ll""'1_n Kimley-Hom -.....J_ U and Associates, Inc. 1\~HILLS including Ramsey County, Mn/DOT, Maplewood, Chanhassen, New Brighton, and Columbia Heights. Brandon will provide traffic engineering review services for this contract at a rate of$125.00 per hour. April Crockett, EfT Storm Sewer & Utility Plan Review As a project engineer, April has completed preliminary through final roadway, storm water, and utility design for a number oflocal public infrastructure projects. April has a Bachelor of Arts degree in Physics and Mathematics from Augnstana College and a Bachelor of Science degree in Civil Engineering from the University of Minnesota. April will assist the project manager in providing storm sewer and utility plan review for the contract. Her hourly billing rate is $100.00. Reimbursable expenses (copy/printing charges, plotting, mileage, delivery charges, faxes, etc.) will be charged as an office expense at 6.0% of the labor fee. The attached project examples demonstrate our successful track record in providing services similar to those requested as a part ofthis project. These examples were chosen to highlight our experience in the design, project management, and implementation of public infrastructure projects as well as our expertise in providing development review services to metro-area municipalities with issues similar to those your community is facing. We look forward to being an integral part of a successful TCAAP redevelopment team. If you have any questions regarding this proposal, please do not hesitate to call either of us. Sincerely, KIMLEY-HORN AND ASSOCIATES, INC. ~aVz~ -;J1L Jo . Horn, P.E. C ent Manager/Associate (651) 643-0406 ion.horn(a!,kimlev-horn.com Beth A. Engum, P.E. Project Manager (651) 643-0434 beth.engum(a!,kimlev-horn.com lP'1_n ~mley-Hom IlIo...I_U and Associates, Inc. Kimley-Horn has assisted the Cny of New Brighton with various planning and design services for the redevelopment of the Northwest Quadrant area of the city. The Northwest Quadrant is a 100- acre redevelopment site located along Old Highway 8 and adjacent to 1-35W and 1-694 in New Brighton. The various improvements in the Northwest Quadrant area include environmental cleanup, soil correction, building demolition, mass grading, utility (sanitary sewer, water main, and storm sewer) replacement, street constructionl reconstruction, storm water pondingfinfiltration areas, sidewalk/trails, street lighting, and landscapelurban design enhancements. The scope of the public improvements was closely coordinated with the adjacent developers, Rottlund HomeslDavid Bernard, and George Sherman and Associates. -A~ HILLS Client: City of New Brighton Location: New Brighton, MN Size: 100 acres Services: Preliminary design, final design, construction administration selVices, soil correction, mass grading, utility (sanitary sewer, water main, and storm sewer) replacement, street construction, storm water ponds, sidewalks, trails, street lighting, and landscape/urban design enhancements Northwest Quadrant Redevelopment The improvements also include the reconstruction of 2,900 linear feet of Old Highway 8 (CSAH 77) from 1-694 to the north. Kimley-Horn assisted the City of New Brighton in obtaining $400,000 in MnlDOT Routes of Regional Significance funding for the Old Highway 8 improvements project and also coordinated the proposed improvements with Ramsey County. Kimley-Horn has provided preliminary design, final design, and construction administration services for these improvements. Achievements: Assisted in obtaining $400,000 in MnJDOT Routes of Regional Significance Funding lI""'l_n ~mley-Hom -....J_U andAssOOales.lnc. :"}i::':";-':-:C::":"i"t':,::":-,,, ':':~;-:;;i":::':::':':, '1\~. HILLS Client: City of Maplewood CarMax/Mogren Improvements Kimley-Horn assisted the City of Maplewood with preliminary design/ feasibility study, final design, and construction phase services for public improvements to support the redevelopment of a 60-acre parcel of land at the northeast quadrant of the Trunk Highway 61 (TH 61) and Beam Avenue intersection. The site is being redeveloped from a golf course to a four lot office/retail development. The scope of the public improvements Included the following: . 1,500 linear feet of urban street . 1,500 linear feet of sanitary sewer . 1,500 linear feet of water main . Storm drainage improvements including the construction of two ponds . Three traffic signals . Reconstruction and widening of 2,000 linear feet of Beam Avenue The overall scope and design of the public improvements was closely coordinated with the project developer. The design of improvements along Beam Avenue and TH 61 was closely coordinated with Ramsey County and Mn/DOT. The project also included significant coordination with the Ramsey-Washington Metro Watershed District since a Watershed ditch system runs through the project area. We also assisted city staff by providing services to review plans and design information for the associated private development improvements. Location: Maplewood, MN Services: Preliminary and final design and construction phase services for new roadway construction and widening; utility (sanitary sewer, water main, and storm sewer) improvements; construction of two ponds; and installation of three traffic signals 1iI""1_.... Kimley-Hom ~_U andAssociates,lnc. ~~_ HILLS Development Review Services Client: Cities of Maplewood, Inver Grove Heights, and Chanhassen Kimley-Horn has assisted the cities of Maplewood, Inver Grove Heights, and Chanhassen with engineering reviews for various private development projects. This has included the review of plans and engineering design information for residential, office, industrial, and mixed-use developments. We have reviewed drainage analysis and reports; roadway design; utility design, including water and sanitary sewer; and grading/erosion control plans. We also have reviewed and completed traffic impact analyses to determine the impact of proposed developments on the surrounding roadway system. As a part of our services, we provided construction observation to verify that private development improvements were being completed in accordance with the approved plans and specifications. These services were either completed in coordination with public infrastructure that we were designing, or to address city staff workload issues. Location: Various Communities, MN Services: Review of engineering design for drainage, roadway, utility, grading/erosion control, traffic impact, and verification of accordance with approved plans and specifications ~ UNDJOIl-" ""g' 11"'1_'" Kimley-Hom -....J_U andAssociates.lnc. -A~~HILLS Client: City of Chanhassen Location: Chanhassen, MN Services: Feasibility study, final design, and construction phase services for extension of public infrastructure including roadways, storm drainage, sanitary sewer, water main, and wetland mitigation. Achievements: . Led public involvement ef. fort regarding the proposed improvements . Assisted in the acquisition of right-of-way easements 2005 MUSA Area Improvements Kimley-Hom provided services to the City of Chanhassen for the development of their 2005 MUSA expansion area. This included AUAR, feasibility study, final design, and construction phase services for the extension of public infrastructure (roadways, sanitary sewer, storm sewer, and water main) to serve a 640-acre development area. The public improvements were closely coordinated with adjacent developers and with the Minnesota Department ofTransportation (Mn/DOT) since the 2005 MUSA area borders Mn/DOT's TH 312/212 design build project area. The 2005 MUSA infrastructure improvements included the following: . More than 9,000 linear feet of trunk (15-inch to 21-inch) sanitary sewer . More than 9,000 linear feet of trunk (12-inch to 18-inch) water main . Storm drainage improvements including storm sewer, storm water treatment/deten- tion ponds, and wetland mitigation areas . More than 5,000 linear feet of collector roadway including two roundabouts and a traffic signal The feasibility study services included the determination of estimated project costs and the establishment of a proposed financing pian for the improvements. Our services also Included a significant public involvement process to present the proposed improvements to the area landowners/developers and to develop consensus. We also were involved in the acquisition of the necessary right-of-way and easements for the improvements. We also assisted city staff by providing services to review plans and design information for the associated private development improvements. ...-J_n ~mIey-Hom ~_U andAssodates.lr<. ,.::'.:..','..:',;:..,...., '. ,'. ,:...<.':....::...:,'. ::.:"'::::':,:.::",:,:""'" "':'0::':::::'::,':,:...' -t\~ HILLS Client: City of Inver Grove Heights Location: Inver Grove Heights, MN Services: Feasibility study, final design, and construction administration for water main, sanitary sewer, lift station, storm sewer, and roadway improvements Achievements: . Assisted in obtaining $594,000 in MnlDOT Coop- erative Agreement Funding . Assisted in the acquisition of right-of-way/easements South Cahill Improvements Mn/DOT selected Kimley-Horn to provide preliminary design of improvements adjacent to Trunk Highway 52 (TH 52) between the new 117th Street interchange and Concord Boulevard to facilitate closure of local property access to TH 52. Kimley-Horn developed and analyzed numerous roadway alternatives for frontage and backage roads, led public involvement efforts during alternatives selection, completed a Mn/DOT staff approved geometric layout for municipal consent, pertormed all necessary traffic analysis, and conducted environmental review as part of an environmental assessment worksheet. Subsequent to the completion of the preliminary design work for Mn/DOT, the City of Inver Grove Heights selected Kimley-Horn to provide feasibility study, final design, and construction administration services for the implementation of some of the improvements identified in the Mn/DOT study. These improvements included water main, sanitary sewer, a sanitary sewer lift station, storm sewer, 1,000 linear feet of rural street reconstruction, and 2,500 linear feet of new urban collector roadway. We also assisted the City in the acquisition of right- of-way/easements and in obtaining $594,000 in Mn/DOT Cooperative Agreement funding for the improvements. lI""'l_n Kimley-Hom IiiloJ_U andAssociales,lnc. mCONSULTING GROUP, INC. ENGINEERS PLANNERS DESIGNERS MINNEAPOLIS FARGO MADISON November 27, 2007 Ms. Kristine Giga, PE Civil Engineer CITY OF ARDEN HILLS 1245 West Highway 96 Arden Hills, MN 55112-5743 SUBJECT: RFQ RESPONSE - TCAAP TECHNICAL SUPPORT Dear Ms. Giga: SRF Consulting Group, Inc. is pleased to submit this proposal to provide professional engineering services to the City of Arden Hills for technical support on the Twin Cities Army Ammunition Plant (TCAAP) planning. As one of the Midwest's leading consulting firms, SRF has the broad technical expertise and dedicated staff to provide you with high-quality and cost- effective services for this important project. Our experience and expertise is well suited to the TCAAP project. Our familiarity with the issues, City staff, and criteria of the various agencies with jurisdiction in the project area will be a benefit to the project. With a multi-disciplinary staff of 250, SRF has the right people for the right projects at the right time. We are well prepared to assist the City in evaluating the design components of the TCAAP project. Project Understanding Based on the information detailed in the RFP and the subsequent information provided to us, we understand that this contract would essentially be for the review of technical documents/ plans prepared by the developer's consultant. These plans would include improvements to water, sanitary sewer, and storm sewer utilities/facilities as well as the review of traffic analyses/forecasting and the associated necessary roadway improvements. Project Deliverables The deliverables for this project will be a series of memorandums, which summarize our review comments on the developer's technical work. Our work will be performed on an as-needed basis and will be on a mutually agreed upon schedule for the review of each set of documents / documentation. City Responsibilities It is our understanding that City staff will prepare all Council reports and attend Council meetings and work sessions. SRF staff will be available as needed for technical assistance at Council Work Sessions and at any other time that City staff deems necessary. www.srfconsufting.com One Carlson Parkway North, Suite 150 I Minneapolis, MN 55447-4443 1 763.475.0010 Fax: 763.475.2429 An Equal Opportunity Employer SRF's Qualifications and Experience Established in 1961, SRF has amassed a thorough and intimate knowledge of planning and design procedures over the past 45 years. As a full-service consulting firm, SRF offers our clients a broad base of engineering, planning, and design services. We are committed to providing quality services and are especially adept at developing solid technical solutions that withstand substantial public and agency scrutiny for complex projects. This project requires a diverse set of skills, including traffic analysis, forecasting, safety analysis, system planning, access management, environmental analysis, stormwater management expertise, and preliminary /conceptual utility assessment. To review the work of others, it is important that the reviewer understand the process for developing the design and the impact of decisions made during the design process. Our staff excels at providing these services, all of which we have applied to similar projects. We will work together with you to develop sound principles, policies, design suggestions, technical review and strategies for implementation. Project Team Qualifications Each of our team members has a long history of working together in various capacities on projects. Many of our team members also have developed a rapport with the City of Arden Hills staff - specifically while working on the TCAAP redevelopment area. SRF is committed to implementing an effective and cohesive partnership with the City. The objectives of this partnership include clear communication with City staff as well as the effective and efficient review of the developer's work to facilitate preparation of a redevelopment plan that is functional, sustainable, and attractive. We have selected our team members based on their availability to commit to the TCAAP Technical Support and their past experiences with similar projects. SRF guarantees that our project team is available to begin the project immediately and remain committed to the City through the course of the project. A brief biography of each of our team members follows. David Juliff, PE - Principal SRF's TCAAP team will be led by David, a project manager who has extensive experience with similar projects and is known for his ability to facilitate multi-disciplinary projects. He is supported by key staff members who are experts in their fields and have intimate knowledge of the TCAAP site and/ or the City of Arden Hills. David has more than 19 years of experience in municipal (street and utility) and transportation engineering and is well-known for his ability to effectively manage multi-disciplinary projects and his creativity in developing unique solutions for difficult and complex projects. He was responsible for ensuring the timely and accurate preparation of public utility infrastructure planning and documentation in the Framework Vision Conceptual Master Plan for the TCAAP site. Mike Aaron, PE - Senior Associate Mike has 16 years of experience in site development and municipal (street and utility) engineering. He was the project engineer responsible for overseeing the streets and utilities preliminary design for the City Council approved Framework Vision Conceptual Master Plan for the TCMP site in the City of Arden Hills. His experience also includes serving as the project engineer responsible for managing the public infrastructure improvements for the 100-acre Heritage Park Redevelopment Project in the City of Minneapolis. Nancy Frick, AICP - Senior Associate Nancy brings 20 years of city planning and 10 years of environmental planning experience to the challenge of balancing community development with protection of social and nature resources and engaging stakeholders in the exciting work of managing change. Nancy continues her on-going responsibility for securing state environmental clearance for the Ryan Companies redevelopment proposal of the TCMP site through the Alternative Urban Areawide Review (AUAR) process. Todd Polum, PE - Senior Associate Todd has more than 10 years of experience in transportation engineering and is well-regarded as an expert in traffic operations analysis and interchange operations from both a regional and local system perspective. He has developed unique solutions that benefit both the local and regional system. Todd is currently responsible for review and comment of the traffic analysis for the TCMP site on behalf of the City of Arden Hills and input into the AUAR documentation. Lisa Goddard, PE - Senior Associate Lisa has more than 10 years of experience with SRF in drainage design, permitting, hydrologic/hydraulic modeling and design activities, including extensive use of XP-SWMM modeling software. She worked on the initial hydrologic study for the TCMP master plan. Other highlights of Lisa's career include the planning and implementation of innovative and integrated stormwater management plans for the TCF Bank Stadium and Heritage Park Redevelopment in Minneapolis. Steve Miller, PE - Associate Steven has 13 years experience in municipal engineering and over 10 years previous experience in construction. His background includes a diverse mix of commercial and residential developments involving street and utilities from feasibility reports to final design through construction. Steven was responsible for the existing and proposed utility analysis for the Framework Vision Conceptual Master Plan for the TCAAP site in the City of Arden Hills in 2002. Craig Vaughn, PE - Associate Craig, an expert in many areas of traffic and transportation engineering, has eight years of experience and regularly contributes to a number of traffic and transportation projects. His skill set includes detailed traffic operations analysis, high level transportation planning, and effective project management and public involvement. Some of his recent projects include the Normandale Lakes District Area Plan in Bloomington, the Richfield Comprehensive Plan Update in Richfield, the Twin Lakes Business Park AUAR in Roseville, the review of the Northwestern College Traffic Study in Roseville, and the review of the Aden Plaza Traffic Study in Arden Hills. Matt Pacyna - Traffic Engineer Matt has several years of experience in traffic engineering, including macroscopic and microscopic traffic simulation. He has worked on a variety of traffic related projects ranging from detailed freeway analysis to small traffic impact studies. Recently, Matt has worked in Roseville on the Twin Lakes Business Park AUAR, the review of the HarMar Shopping Center Traffic Study, and the Fairview Avenue/Oakcrest Avenue Intersection Evaluation. Resumes for the majority of our team members were submitted in SRFs Statement of Qualification for Consultant Services in June of 2007. However, we have provided resumes for Mike Aaron, Todd Polum, and Matt Pacyna in our submittal. Basis of Payment/Budget We propose that we be reimbursed for our services on an hourly basis for the actual time expended. Other direct project expenses, such as printing, supplies, reproduction, etc., will be billed at cost, and mileage will be billed at the current allowable IRS rate for business miles (as detailed in our Statement of Qualifications provided previously). The 2007 hourly rates for our individual staff members are indicated below: Staff Member 2007 Rate David Juliff............._. ......... $162.56 Mike Aaron........................ $147.18 Nancy Frick........................ $131.74 Todd Polum ....................... $125.40 Lisa Goddard..................... $114.81 Craig Vaughn .................... $111.14 Steve Miller ........................ $111.87 Matt Pacyna ._....................... $77.06 Our rates for 2008 have not yet been established and will not be completed until mid-December. At that time, we would be pleased to provide you with a more definitive rate table for 2008. On average, we anticipate that rates will increase four to five percent from our stated 2007 rates. Invoices are submitted on a monthly basis for work performed during the previous month. Payment is due within 30 days. Notice to Proceed A signed copy of this proposal or a separate authorization letter either mailed or faxed to our office will serve as our notice to proceed. Our fax number is 763-475-2429. SRF is committed to working collaboratively with the City of Arden Hills and the developer to meet your project objectives. We are very excited about this project and look forward to strengthening our relationships with you and your staff. We appreciate this opportunity to present this proposal and would be pleased to answer any questions you may have. Sincerely, SRF CONSULTING GROUP, INC APPROVED: (signature) Name Title Date This cost proposal is valid for a period of 90 days. SRF reserves the right to adjust its cost estimate after 90 days from the date of this proposal. Proposal No. P07706 MICHAEL AARON, PE Senior Associate AREAS OF EXPERTISE . Site Planning . Highway Design . Street Design . Construction Document Preparation . Drainage Design . Utility Design . Trail Design . Hydraulic Analysis . Stormwater Management . Construction Administration EDUCATION B.C.E., Bradley University, 1991 A.A.S., Technology in Highway Engineering, Morrison Institute of Technology, 1987 REGISTRATION Minnesota (PE) No. 25721 PROFESSIONAL AFFILIATIONS American Public Works Association ~CONSULTING GROUP, INC. ENGINEERS I PLANNERS! DESIGNERS Mr. Aaron has 15 years of experience in site planning, municipal engineering, highway and trail design, hydraulic analysis and stormwater management. His municipal and site development expertise includes feasibility, demolition, layout, drainage, utilities, grading, detailing and supporting specifications, as well as permitting and contract administration. Since joining SRF in 2000, Mr. Aaron has been involved in a wide range of projects, including municipal facilities and commercial and retail site development. SITE PLANNING PROJECTS . Twin Cities Army Ammunition Plant Conceptual Master Plan: Streets and Utilities Preliminary Design, Arden Hiils, Minnesota . University of Minnesota Equine Center, Saint Paul, Minnesota . Hennepin County Public Works Facility, Bloomington, Minnesota . University of Minnesota Gopher Football Stadium, Minneapolis, Minnesota . University of Minnesota Landscape Arboretum Visitor Center Expansion, Chanhassen, Minnesota . Department of Human Services Building and Parking Ramp, Saint Paul, Minnesota . Augsburg College Gateway Center and Campus Parking, Minneapolis, Minnesota . Westminster Junction Development Master Plan, St. Paul, Minnesota . BOO-Acre Land Plan, Lakeville, Minnesota . Wal-Mart Stores, Freeport and St. Charles, Illinois . Menards Stores, Sterling and Machesney Park, Illinois . Shopko Stores, Freeport and Belvidere, Illinois . Sycamore Prairie Business Park, Sycamore, Illinois . Candlewood Hotel Project, Richfield, Minnesota . Stillwater Library Expansion, Stillwater, Minnesota ROADWAY AND MUNICIPAL PROJECTS . Concept Layout for County Road J from Airport Road to Naples Street, Ramsey County, Minnesota . Heritage Park Redevelopment, Minneapolis, Minnesota . Vicksburg Lane and TH 55 Improvements, Plymouth, Minnesota . Concept Layout for Van White Memorial Boulevard, Minneapolis, Minnesota . Samuel H. Morgan Regional Trail, Saint Paul, Minnesota . East Bank Mississippi River Regional Trail, Saint Paul, Minnesota . Landmark Plaza Street Reconstruction, Saint Paul, Minnesota . CSAH 9 (Dodd Boulevard) Improvement, Lakeville, Minnesota . Nicollet Avenue Reconstruction, Burnsville, Minnesota TODD POLUM, PE, PTOE Senior Associate AREAS OF EXPERTISE . Freeway Operation Studies . Corridor Shtdies . Geometric Layout . l1affic Impact Studies . Intersection Analysis . Safety and Accident Studies . Traffic Signal Design . Public Involvement EDUCATION B.S.c.E., University of Wisconsin - Platteville REGISTRATION Minnesota (PE) No. 44314 Wisconsin (PE) No. 34687-006 CERTIFICATION Professional Traffic Operations Engineer (PTOE) WisDOT TIA Preparers Certification No. SE05-804-076 PROFESSIONAL AFFILIATIONS Institute of Transportation Engineers CONTINUING EDUCATION Freeway Modeling Pre-TImed Signal & Actuated Signal Traffic Management of Land Development TEAPac Software Freeway Design and Operations Fundamentals of Geometric Design Human Factors Traffic Calming Systematic Development of Informed Consent ~CONSULTING GROUP, INC. ENGINEERS I PLANNERS I DESIGNERS Mr. Polurn has ten years of transportation engineering experience, Prior to joining SRF, he served as a traffic and design engineer with the Wisconsin Department of Transportation, where he participated in numerous traffic analysis and roadway reconstruction projects. Mr. Polum leads SRF's freeway modeling and operational analysis activities. He has the knowledge and expertise to provide solutions to difficult issues and is actively involved in corridor studies, preliminary design, traffic impact studies, freeway modeling and operational analysis. PROJECT EXPERIENCE . Twin Cities Army Ammunition Plant ADAR Traffic Analysis, Arden Hills, Minnesota . Medtronic Office Development, Traffic Impact Study, Blaine, Minnesota . 1-394 MnPass Phase II (Toll-lane) Freeway Analysis, Golden Valley, Minnetonka, and Minneapolis, Minnesota . Twins Stadium EIS Freeway Capacity Review, Minneapolis, Minnesota . Vikings Stadium Freeway Capacity Revievv, Blaine, Moundsview, New Breighton, and Arden Hills, Minnesota . Legacy of Apple Valley, Traffic Impact Study, Apple Valley, Minnesota . Blue Cross Blue Shield East Campus, Traffic Impact Study, Eagan, Minnesota . Lowe's Traffic Impact Study, Fargo, North Dakota . Block 64, Traffic Impact Study, Hopkins, Minnesota . YMCA Traffic Study, Eau Claire, Wisconsin . 1-494 Fish Lake Interchange Freeway Analysis and Interstate Access Modification Request, Maple Grove, Plymouth, Minnetonka, Minnesota . Mall of America Phase II Freeway Analysis, Bloomington, Minnesota . 1-94/34th Street Interchange Study Freeway Analysis and Interstate Access Modification Request, Moorhead, Minnesota . 1-494/TH 120 Interchange and Corridor Study Freeway Analysis and Interstate Access Modification Request, Woodbwy and Maplewood, Minnesota . 1-394/TH 12 Corridor Study Freeway Analysis, Golden Valley and Minnetonka, Minnesota . I -494/TH 169 Preliminary Design Freeway Analysis, Eden Prairie, Edina and Bloomington, Minnesota . 1-35W/TH 62 Preliminary and Final Design Freeway Analysis and Interstate Access Modification Request, Richfield and Minneapolis, Minnesota MATTHEW PACYNA, Ell Traffic Engineer AREAS OF EXPERTISE . Traffic Impact Studies . Freeway Operations Analysis . Cost Allocation Projects EDUCATION B.C. E., University of Minnesota, 2005 REGISTRATION Engineer in Training (MN) PROFESSIONAL AFFILIATION Institute of Transportation Engineers ~CONSVLTING GROUP, INC. ENGINEERS I PLANNERS I DESIGNERS After graduating from the University of Minnesota with a degree in Civil Engineering, Mr. Pacyna joined SRF. His work has focused on traffic impact studies and freeway analysis. Through this work, he has gained expertise in traffic simulation software such as Synchro/ SimTraffic and CORSIM. Some of his recent work includes the Minneapolis West Redevelopment Traffic Study in SI. Louis Park, Twin Lakes AUAR Update in Roseville, Broadway Avenue Corridor Study in Rochester, and Lino Lakes Cost Allocation in Lino Lakes. TRAFFIC IMPACT STUDY PROJECTS . Minneapolis West Redevelopment Traffic Study, SI. Louis Park, Minnesota . Twin Lakes AUAR Update, Roseville, Minnesota . SI. Michael High School Traffic Study, St Michael, Minnesota . Miner Site Traffic Demand Management Plan (TDMP), Golden Valley, Minnesota COST ALLOCATION PROJECTS . Airport South Roadway Infrastructure Improvement, Bloomington, Minnesota . Lino Lakes Cost Allocation, Lino Lakes, Minnesota CORRIDOR STUDY PROJECTS . Broadway Avenue Corridor Study, Rochester, Minnesota . Bridge Avenue Corridor Study, Albert Lea, Minnesota FREEWAY ANALYSIS . I -94fTH 10 River Crossing Alternative Analysis, Clearwater, Minnesota OTHER PROJECTS . Northwestern College Planned Urban Development (POO) Review, Roseville, Minnesota "-- r;> URS November 27,2007 Ms. Kristine Giga, P.E. Civil Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112 RE: Proposal for Professional Services Technical Support for Twin Cities Army Ammunition Plant (TCAAP) Dear Kris; Thank you for the opportunity to submit this proposal for technical support related to the ongoing TCAAP development process. We have outlined our understanding of the project, our proposed key personnel and hourly rates for the work below. PROJECT UNDERSTANDING We understand that you are seeking professional services to assist City staff with the technical review of water system plans, sanitary sewer system plans, storm sewer system plans as well as traffic analyses. Based upon your RFP, we anticipate our efforts to include reviewing plans prepared by the developer's consultants and providing written comments, recommendations or technical questions associated with the system plans to be addressed by the developer. The anticipated time commitment is approximately 4 hours per week through March 31, 2008 with the potential for extension through the end of 2008 at the request of City Staff. KEY PERSONNEL Lead Contact for City: Greg Brown will serve as the main point of contact for City staff for these services. He will provide overall project management and see that the needs of the City are met within the established schedule. Sanitary Sewer, Water Distribution, Storm Sewer Plan Reviews: We have identified three individuals to provide expertise in this area as appropriate. Greg Brown, PE Greg leads the URS Roadway and Infrastructure group and brings nearly twenty years of experience associated with preliminary and final utility and stormwater design to the City's TCAAP review team. Greg's resume includes the development of masterplans for watermain, sanitary sewer and storm sewer for the 540 acre Arbor Pointe development in Inver Grove Heights, a development very similar in scale to the proposed TCAAP development. In addition, Greg has superior knowledge of utility and drainage infrastructure throughout Arden Hills including the TCAAP property as a result of providing City Engineering and infrastructure planning services from 1997 to present. Greg's experience includes the design of CSAH 96 roadway, storm sewer and watermain improvements that directly interface with the TCAAP development. Thresher Sqllare' 700 Third St'~ef SOllth . SlIite 600. Millll,o!,o!is. MN 55415' Pholle: (612) 370-0700' Fax: (612) 370-1378 URS Ms. Kris Giga, PE November 27,2007 Page 2 Frank Ticknor, PE Prank is a senior civil engineer within the Roadway and Infrastructure group of URS and brings eight years of experience associated with preliminary and final utility and stormwater design to the City's TCAAP review team. Prank is also intimately familiar with Arden Hills' utility and drainage infrastructure as a result of his experience with providing planning and engineering services to Arden Hills from 2000 to present. Frank was responsible for managing the lift station rehabilitation program including the design and upgrade of 10 lift stations. Joel Toso, PE (see attached resume) Joel recently joined URS and brings over twenty years of unique expertise in the areas of stormwater system design and modeling as well as water distribution and sanitary sewer system design. Joel will offer a fresh perspective on storm water management from both a quality and quantity point of view. Joel's career has focused on leading edge techniques for modeling and designing of water resources improvements. Joel will be able to quickly assess the accurateness and appropriateness of developer masterplans and models related to storm water, potable water supply and sanitary sewer improvements. Traffic Analyses: John Crawford, PE, PTOE John leads the URS Traffic Engineeling group and brings over fifteen years of experience with traffic engineering, travel demand modeling and transportation planning to the City's TCAAP review team. He has recently conducted a traffic impact analysis for a similar 600-acre development in Hassan Township, just north of Maple Grove. John understands the range of traffic issues associated with the TCAAP property, specifically how the location and design of perimeter access nodes to the property impact existing travel patterns and traffic levels on CSAH 96, TH 10, I35W and County Road 1. John will be able to evaluate trip generation methods, review and run traffic models prepared by the developer and quickly assess whether they have accounted properly for existing and proposed conditions. FEE SCHEDULE The following are the proposed hourly rates for the individuals listed in this proposal. These rates will be used from the start of the project through the end of 2008. Greg Brown, PE Prank Ticknor, PE Joel Toso, PE John Crawford, PE, PTOE $135.00/hr $ 85.00/hr $140.00/hr $120.00/hr "F ).. URS Ms. Kris Giga, PE November 27,2007 Page 3 THE URS Anv ANTAGE URS has provided comprehensive engineering services for the City of Arden Hills since 1997 with a consistent team that has developed an unequaled knowledge and understanding of the City's infrastructure systems. Our existing working relationships with the City's professional staff and maintenance personnel eliminates the learning curve that other consultants will have. Prank and Greg have been involved in numerous planning discussions and workshops over the years associated with the TCAAP property and have a good understanding of the many issues associated with the redevelopment of the site. URS does not have any direct or peripheral relationship to the TCAAP developer and can offer Arden Hills unbiased advice and recommendations regarding infrastructure decisions, most of which carry significant financial implications to the Developer and quality, maintenance and operations implications to the City. URS is also able to draw upon our Minneapolis Office as well as national staff to provide the City with virtually any unique expertise that may arise during the course of the TCAAP development process. URS leads the market in our depth and range of professionals on staff. We would like to thank the City again for this opportunity to participate in this marquee project. rfyou have any questions or need additional information, please feel free to call me at 373-6479. Sincerely, ~~ Prank Ticknor, PE Sf. Civil Engineer Attachment: Resume cc: Pile , - Years of Experience 25 Years Education Ph.D., University of iVIinnesota, 1986 (Hydraulics) M.S., Civil Engineering, University of Minnesota, 1983 (Hydrology) B.S., Civil Engineering, University oflvIinnesota,1981 Registrationl Certification Civil Engineer: MN 19950 Professional Hydrologist - American Institute of Hydrology URS Joel W. Toso, PhD, PH, PE Overview Dr. Tosa has twenty-five years of experience in water resources engineering. He is the water resources department manager of the URS Minneapolis office. He has managed and provided technical direction for surface water management plans for several municipalities and developments around the Twin Cities Metropolitan area in Minnesota. These plans included: hydrology and hydraulic modeling; channel, pipe, and pond sizing; wetland delineations and considerations; and cost estimates. He has also provided expertise in the area of water supply including: source investigation for future needs, designing wells, pumphouses, and water mains. Selected examples of his experience related to water supply and stormwater management are provided below. Woodbury, MN. Provided general civil engineering services for several sites that included: new stormwater management techniques (pervious pavements, rain gardens, increased infiltration methods), sanitary sewer and water main design, detailed wetland considerations, and lift station design. City of New Brighton, MN. Assisted management of a pipeline project including design of approximately one mile section large diameter raw water and waste water pipe lines. City of Northfield, MN. Managed a study of the water distribution system to determine the low pressure zones and the impact of adding a hospital complex. NSC, Blaine, MN. Provided general civil engineering services to the National Sports Center from 1996 until present including: stormwater management, water supply system design for the golf center, an innovative design to remove ditches from soccer fields, and overall design for numerous sites. Chronology 2007 - Present, URS Corporation, Water Resources Department Manager 1997 - 2007, President of Polaris Group, Inc., Consulting Firm 1988-1997, Project Manager, Barr Engineering Company 1987-1988, Research Engineer, QIT Iron and Titanium (Quebec Mining Company) 1985-1987, Civil Engineer, Barr Engineering Company ... WSB & Associates, Inc. Infrastructure I Engineering I Planning I Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 November 27, 2007 Ms. Kristine Giga, PE Civil Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112 Re: Proposal to Provide Professional Engineering Services Technical Support for Twin Cities Army Anununition Plant (TCAAP) Dear Ms. Giga: The City of Arden Hills has envisioned the redevelopment of the TCMP property since 1995. There has been a great deal of careful planning undertaken over the past twelve years based on the visions of the community, and the City is now prepared to make these visions a reality, WSB & Associates, Inc. is glad to have the opportunity to be part of a project that will shape the future of the City for years to come. We have selected a team to serve the City of Arden Hills that will bring value and experience to the City. We have highlighted a number of reasons why we believe we can provide the services the City needs, while providing the greatest overall value as well. The following are a few of the key reasons why we are the right consultant for this project: . StrollS?: Client Manager: I bring strong, relevant qualifications to this project. I have had the unique opportunity to provide these types of services to communities for the past 10 years as a staff City Engineer, Consultant City Engineer, and in communities that contract for the service in a manner similar to this RFP. I have managed the review of development proposals from individual commercial developments to mixed-use projects covering as much as 750 acres, many of which required coordination with outside agencies, environmental documents and remediation, and substantial infrastructure improvements. . Provide Solutions: Our development review team will not simply review plans and provide comments; we will provide input to the City and the developer regarding design standards, evaluation of proposed development options, and consideration of sustainable development techniques. This will result in maximum cost effectiveness and value for both the City and the developer. We will be a benefit to both the City and developer by developing solutions that get the work and allow the project to move forward. . Review with End Product in Mind: When we review development plans, no matter how preliminary, we review them with an eye for function, constructability, long term maintenance, and cost effectiveness. We take the time during the preliminary phase to partner with the City and the development team to establish a plan that everyone can feel confident will not require significant changes as the project moves into final design and construction. Minneapolis I St. Cloud Equal Opportunity Employer Ms. Kristine Giga November 27,2007 Page 2 of2 . Public Onlv Focus: We are an engineering firm who only provides services to governmental agencies, not private developers, and we will represent the City without any conflicts of interest. WSB will balance the need of maintaining the City's goals, while and being responsive to developers. We have outlined our unique development review experience, and our project team, in the proposal. We are available to start as soon as you have a need for assistance. We would like to be part of this exciting project! Please contact me at 763.287.7192 if you have any questions or require additional information. .. .. Project Understanding/Approach ..................................................1 Project Team................................................................................. 4 Experience Overview.... ...................................... ............... ... ............................ 10 Specific Development Experience.................................................... 1 3 References................. ..... ..... ..... ............. ....................... ..... ...... ....... 17 Fee Schedule ...............................................................................18 Appendices Resumes Sample Document ... WSB &:Associales, [rrc. .. .. ;:3 ttJ r< t:r:I o >-r:l n o z >-3 t:r:I Z >-3 Vl .. .. .. .. Understanding Approach Background Research .A. WSB &A"."',,;a/e,', Inc. The City began planning for the redevelopment of the TCAAP property in 1995, based on the vision of the late Congressman Bruce Vento. This original vision was incorporated into the City's 1998 Comprehensive Plan and includes a mix of open space, preservation of site features and amenities, transit, pedestrian- friendly housing, and retail employment centers. The City began with the development of a Framework Vision and Goals for approximately 585 acres of the property between 2002 and 2005 and has developed a Master Development Plan based on the Framework over the past two years. The next step in the process is the development of a refined concept and detailed preliminary plans. The City is requesting assistance with the review of the technical aspects of the plans as part of the process through March 31, 2008, with the understanding that the contract may be extended through the preliminary design stage expected to be completed at the end of 2008. We also understand that the City expects an average of four hours per week of assistance, on an as-needed basis, in the following areas: . Water system plans . Sanitary sewer plans and layouts . Traffic analyses . Storm water management/storm sewer plans WSB is committed to being a strong partner with the City of Arden Hills, its residents, landowners, and proposed developer(s). WSB and our proposed Development Review Team are committed to providing the City with value in everything we do, no matter the task. With this in mind, we will take the following approach to this project: There has been a great deal of time and effort invested in planning for this project and we understand that the technical review of the project cannot be completed in a vacuum. We need to understand the overall vision, goals, and policies for the TCAAP project in order to provide the best review of the technical aspects of the project. We have already reviewed some of the guiding documents for the project and will continue to educate ourselves on the intricacies of the TCAAP Redevelopment on our own time. This will include a review of the Master Planning Framework, ADAR, and utility and transportation studies, among others. There will not be a charge for these hours. This will involve reviewing the pertinent documents, including but not limited to the following: . TCAAP Master Plan . Framework Vision and Goals . Public Financing Policy . TCAAP AUAR . City design standards . City Public Works policies and goals . Utility and transportation studies related to the TCAAP Area . Regional information for Ramsey County and Mn/DOT . Examples of City review documentation for previous projects - 1 - .. .. 'lj ::0 o '-< tT:I n >-l C Z t::I tT:I ::0 CIl s;! Z t::I ....., Z ~ >- '"d '"d ::0 o >- n ::r:: .. .. .. .. Project Kick-offs and Assignments Adaptability Solutions, Not Jwt Comments .6- WSB &Associales,Inc Value to the City . Technical review with overall goals in mind . Minimize time and cost of review . Get up to speed quickly on the many project details Upon notification by the City of a specific development review task, we will meet with the design team to clarifY roles and responsibilities. Jay Kennedy, our Development Review Manager, will be the contact for the City and developers and will attend these kick-off meetings. Jay will assemble the WSB review team and assign review responsibilities. This team may need to have direct contact with the developer's engineer or outside agencies, and will coordinate directly with them on specific design issues. We will keep the City staff informed at all times of our direct discussions. Value to the City . One point of contact for City staff . Minimize City staff time coordinating with developer and agency staff . Jay is an experienced review facilitator We are comfortable serving whatever role is needed, depending on the City's requirements and staff availability. If there are small individual items that the City wishes to coordinate or if we need to take a larger role, we are available to provide any and all assistance. We will tailor our services and reports based on the City's needs, project schedule, and the end user. We understand that the City Council, City staff, outside agencies, and developer's professional staff need different information in order to make decisions. Our Development Review Team has utilized a number of techniques to meet this goal in other communities, depending upon the specific situation, including: . Separate planning/policy review and detailed technical review letters . Detailed technical comments included directly as "red lines" on the plans, which are then scanned and provided as an attachment to our planning/policy report . Direct meetings with the developer's professional staff to review detailed technical comments Value to the City . Clear, straight-forward decision making . Minimizes review time and time required to make plan revisions . Fresh, thoughtful approach to project issues . Ability to provide ideas on how to get it done, not just review and note what is does not comply with requirements WSB's review philosophy is to work in conjunction with the design engineer and developer to help them achieve their goals, while protecting the City standards and minimizing future maintenance. Our philosophy can be summed up in this phrase: "Don't tell them why it can't be done, tell them how it can!" -2 - .. .. 'i:I ~ o '-< t:ri n >--l C Z t::J t:ri ~ CI1 s;2 Z t::J ...... Z ~ ;J> "d "d ~ o ;:J> n ::r: .. .. .. .. Developer Coordination Multiple Department Awareness .. WSB &A"SQ~ialcs.lnc_ Value to the Ciw . Cost effective, long-lasting solutions . Solutions that benefit all parties The TCAAP project involves a large developer team, induding numerous engineeting and planning firms and several development firms. Considering this group and the City team assembled to manage the process, it will be important that the selected reviewing firms be adept at the coordination role. WSB and Jay Kennedy regularly serve in this role for many Cities and understand how to help the process toward success. We communicate quickly with agencies, engineers, planners, and developer representatives to make sure they are not wasting design dollars, while also ensuring that the City's goals are being met. Value to the Ciw . Quick, effective decision making . Collaborative solutions We will complete our work with an understanding of the other City department needs. We are aware that engineering standards and review must be sensitive to the needs of the Public Works, Parks, Finance, Community Development, and Planning functions within the City. We will seek out not only the engineering staff, but other departments as needed for their input in order to be sensitive to all concerns. Many times, minor adjustments to concept plans can achieve the goals of individual depattments. Value to the Ciw . All department needs incorporated into review . Minimize City Engineering staff coordination -3 - .. .. '1:1 ~ o "--< t:T1 n >-J C Z t::J t:T1 ~ C/) ;;! Z t::J >-< Z ~ ~ >-0 ~ o ::>> n ::c .. .. ..~ Ii rf) ::J :E ~~ ...... c co 0... C o :;:::::; 'c ::l ..... E .8E t:<( 0>- o..E 0....... ::l<( Cf)cn -Q)E: ~;.-. '" ....... ,.... ~ 'c '-' ..cc <.).- Q) :s: I- I- ti '" 'e- Q.. CfJ ;s: 0.." - Cll ::=:t;) '" .- :t:Ci: 0", :;;: .- > ro(tl ~>- " <= << w o b:: w 0.. <= o " >, ro I >, -'" '-' Cll '" W 0.. N- ro :it .0 ro CfJ >- wWJ 0..""; ." ~ Cll Cll~ lio~ ,- Cll Cll_ N{ii 1;';S: <= Cll ro .- ZE ro ~ .. .. Team Overview Key Personnel -----------..----..- - ---------.----- Jay Kennedy, PE Development Review Manager Diane Hankee, PE Assistant Development Review Manager/General Municipal ... WSB & AssOC;iJle,', Inc. .. .. WSB has assembled a project team with outstanding expertise in the area of development review. Each team member has an emphasis on engineering technical aspects in street, utility, storm water management, and transportation systems. Out team members have worked together on development review projects for several years in multiple communities and will be a valuable asset to the City on the TCAAP development project. '"d ~ o "--< t:r:I n >-oj >-3 t:r:I ~ A brief summary of each team member's role in the TCAAP project, as well as pertinent development review experience, is included within this section. Full resumes for all but two of the team members were included within our Proposal to Provide Municipal Engineering Consulting Services submitted on June 25, 2007. We have included summary and full resumes of these individuals within this section and in the appendix. Jay's primary focus over the past five years has been in the role of City Engineer and/or Development Review Manager for projects in the Cities of Hugo, Mahtomedi, and North Branch. Jay has participated as the lead Project Manager for many large public and environmental projects including design, review, agency coordination, agreement negotiation, and environmental documentation. He views this role as a specialty that has been carefully developed through his involvement reviewing development projects in several communities. Jay's role in the TCAAP technical review will be: . Primary contact for communication with City staff . Provide overall project direction and leadership for the WSB project team . Quality control, staff scheduling, and overall project management to ensure that the project meets a high quality standard, and is delivered on time . Review facilitator Examples of Jay's experience managing development review include: . Water's Edge Preliminary/Final PUD and Plat - Hugo, MN . Victor Garden's North and South Commercial- Hugo, MN . North Branch Marketplace - North Branch, MN . ESSBY - North Branch, MN . Victor Garden's 4th_6th Additions - Hugo, MN . Wedgewood Village Commercial- Mahtomedi, MN . Heritage Ponds 1" and 2nd - Hugo, MN Street and Utility Review Diane's role in the TCAAP technical review: . Secondary contact for the City . Manage the review of the street and utility aspects of the project . Directly responsible for coordinating the comments from other team members into one cohesive report to the City -5 - .. .. .. .. Jeff Kurth, EIT General Municipal Kevin Newman, PE Wastewater Review/ Lift Stations Joe Ward, PE Wastewater Review/Lift Stations .A. WSB &A.,'sod(JI~S,I"c. Examples of Diane's development review experience include: . North Branch Market Place - North Branch, MN . ESSBY Industrial Park - North Branch, MN . Lucht's Crossing - North Branch, MN . Gateway Vista - Grant, MN Jeffs role in the TCAAP technical review: . Review the basic aspects of the street and utility plans Examples of Jeffs development review experience include: . North Branch Market Place - North Branch, MN . Golden Pines Estates - North Branch, MN . North Branch Oaks - North Branch, MN Kevin's role in the TCAAP technical review: . Sanitary sewer capacity analyses . Lift station analyses/design Examples of Kevin's experience include: . Victor Garden's Development - Hugo, MN . Diamond Point East - Hugo, MN . Lucht's Crossing - North Branch, MN . Prestwick Place - Rosemount, MN . Downtown Redevelopment Study - Rosemount, MN . CSAH 42/ Akron AUAR - Rosemount, MN Joe has four years of experience in the civil engineering field. Joe has expertise in wastewater treatment, lift stations, sanitary sewer collection systems, and sanitary sewer system comprehensive system plans designed with SewerCAD. Joe has completed many development reviews related to wastewater systems, including the water and sanitary sewer elements for EAWs and AUARs. We have included Joe's full resume in the appendix. Joe's role in the TCAAP technical review: . Assist with sewer capacity and lift station analyses Examples of Joe's experience include: . United Health Group Traffic and Infrastructure Study - Minnetonka, MN . OPUS II Master Plan - Minnetonka, MN . Pahl Site Review - Rosemount, MN . Rosewood Commons - Rosemount, MN . Wildridge Lift Station - North Branch, MN -6 - .. .. "'d ;::0 o L.; tI:I (J >-l >-3 tI:I ~ .. .. .. .. Nancy Zeigler, PE Water Supply/Water System Modeling Jamie Wallerstedt, ElT Water Supply Review/Water System Modeling Chuck Rickart, PE, PTOE Traffic Operations ~ WSB &A.'."",,;ul(!s,fnc .. .. Nancy's role in the TCAAP technical review: . Review water supply plans for consistency with Comprehensive Plans . Review water system layout with regard to pressure and water quality 'ij ~ o '-< tI1 n >--'l >--3 tI1 ;:t> ~ Examples of Nancy's most recent experience include: . Water's Edge - Hugo, MN . North Branch Marketplace - North Branch, MN . Rosemount's downtown redevelopment study . Wyoming Xccent Development Jamie has six years of civil engineering experience, primarily in the area of water supply engineering. Jamie has evaluated a number of developments to determine if the expected pressures and flows will be adequate, and what improvements are necessary to provide adequate water supply. We have included Jamie's full resume in the appendix Jamie's role in the TCAAP technical review: . Assist with review of water supply plans . Review/revise water system model and test scenarios to verify adequate water pressures Examples of Jamie's experience include: . ESSBY Development - North Branch, MN . Beaver Ponds South - Hugo, MN . Victor Garden's North Village Retail- Hugo, MN Traffic Operations. Transportation Planninst. and MNIDOT. County Coordination Chuck's role in the TCAAP technical review: . Review overall traffic operations, access, site circulation, and traffic control . Review traffic studies submitted by the Developer, including data from traffic models (e.g. Synchro, SimTraffic, VSIM, CORSIM, HCS) . Review preliminary site plans for circulation and connectivity between and within individual sites Some of Chuck's recent experience includes: . Victor Garden's North Village - Hugo, MN . Festival Foods - 75,000 SF Retail- Hugo, MN . Brandtjen Farms - 600 acres - Lakeville, MN . Park Place Development - 850+ Residential Units - Minnetrista, MN . Cub Foods - 100,000 SF Retail- Shorewood, MN . Shakopee Crossings - 900,000 SF Office, 500,000 SF Retail, 600 Housing Units - Shakopee, MN . Dearfield Addition - 540 Housing Units - Prior Lake, MN -7 - .. .. .. .. Becky Haydon, PE, PTOE Transportation Planning and Mn/DOT, County Coordination Todd Hubmer, PE Surface Water Management Review Phil Belfiori, AICP Surface Water Management Review ... WSB &kW'C;UIC."Jllc_ Becky's role in the TCAAP technical review: . Review and build on the previous studies that have been completed for the TCAAP development to make certain that the future transportation needs of the developers, the City, Ramsey County, Mn/DOT and ultimately the traveling public are met . Coordination with Mn/DOT and Ramsey County . Federal and Cooperative funding assistance A sample of Becky's experience includes: . North Branch Marketplace - North Branch, MN . Dean's Lake Crossing - Shakopee, MN . ESSBY Development - North Branch, MN . TH 95 Interchange Preliminary Design - North Branch, MN Surface Water Resources Todd's role in the TCAAP technical review: . Review of Comprehensive Storm Water Plan for the Development . Coordination with Rice Creek Watershed District . Review of storm water management and treatment techniques . Review overall grading plans for flood protection Examples of Todd's experience include: . North Branch Marketplace - North Branch, MN . ESSBY Development - North Branch, MN . Apache Plaza - St. Anthony, MN Phil's role in the TCAAP technical review: . Review storm sewer and storm water management plans . Review storm water modeling . Review ground water information/low building floors . Detailed grading plan review Examples of Phil's experience include: . Water's Edge - Hugo, MN . Victor Garden's North Village - Hugo, MN . ESSBY Development - North Branch, MN . Wedgewood Village - Mahtomedi, MN - 8- .. .. '"d ::0 o c...; tr:I n >-j >-3 tr:I >- $: .. .. .. .. Andrea Moffatt, PWS Wetlands/Environmental Travis Fristed Wetlands/Environmental ... WSB &Associales, Inc. Andi's role in the TCAAP technical review: . Review plans for consistency with AUAR . Coordination with MPCA, EQB, and EPA Andi's experience includes: . Apache Plaza EAW - St. Anthony Village, MN . ESSBY AUAR - North Branch, MN . Everton Avenue Neighborhood - Hugo, MN . Park Cove AUAR - Minnetrista, MN . Richfield Lake Phase I Environmental Site Assessment - Richfield, MN Travis' role in the TCAAP technical review: . Review Wetland Delineation Reports/documentation . swppp review Examples of Travis' experience include: . Water's Edge - Hugo, MN . Victor Garden's North Village - Hugo, MN . ESSBY Development - North Branch, MN . Flink Avenue - North Branch, MN . Wedgewood Village - Mahtomedi, MN While we understand that the City is looking for utility, storm water management, and transportation assistance, we would like to inform you of some of the complementary services that are also available within our firm: . Easement and right-of-way acquisition . Geographic Information Systems (GIS) . Pavement management, materials, and maintenance . Environmental studies (E1S, AUAR, EAW) . Bridges and structures We previously provided detailed qualification information on the staff members who provide these services in our June Statement of Qualifications. -9 - .. .. 'l:I ~ o '-< tI:I () ...., >-j tI:I ~ .. .. .. .. Overview Previous TCAAP Experience Development Review Experience - Hugo an.d North Branch .A WSB &Ass!1dales, Iflc_ .. .. We have been involved with the review of many development projects similar in scope to the TCAAP project. We have performed a significant amount of plan review work, which all involved coordinating improvements with agencies such as Ramsey County, Mn/DOT, Rice Creek Watershed District, MPCA, and the EPA. We are a strong advocate for City interests and have been very successful in this regard. t:r:I :>< "1:1 tI1 ;:0 >-< tI1 Z n tI1 In this section, instead of providing project descriptions from many different. Cities, we are focusing on the role we have served for the Cities of Hugo and North Branch over the past several years. Our role with both cities is very similar to the role that is being proposed for the TCAAP project in Arden Hills. We have established a plan review team to address street, transportation, utility, grading, and other miscellaneous improvements for a series of large developments, very much like the review structure that will be needed in Arden Hills. After an overview of our experience in Hugo and North Branch, we have included project sheets to provide a sampling of our development review experiences. We have also included brief summaries of the variety of expertise our staff can provide. This will give you an overview of our qualifications to manage the utility, storm water resources, and transportation review process for your City, as well as highlight other potential areas where we can assist you. Our proposed team is not a part of the developer's TCAAP project team, although we were invited to provide a proposal and declined the offer. As we have previously discussed with the City, WSB does not work directly for private clients. We believe that having WSB on the City's development review team will provide a "second set of eyes", and a partner that is working in the City's best interest. Members of our team have had experiences with the TCAAP in the past. Todd Hubmer is currently involved in the NRPA process representing St. Anthony Village and working closely with all of the regulatory agencies and stakeholders on the long term clean up of the groundwater aquifers. In addition, Pete Willenbring has had extensive experience with the cleanup efforts at TCAAP dating back to the early 1980's. Pete will be a resource for Todd and the rest of the team as part of our review. Jay Kennedy serves as the Development Review Manager for Hugo and North Branch and coordinates all of the review activities for the different phases of development. We have been involved with preparing the engineering portion of the staff report for distribution to the Planning Commission and City Council. We also are involved with the drafting of the Developer's Agreement for many of the projects. WSB is very active in working with the City and developers to provide infrastructure options that would be beneficial to the overall project and achieve the goals of the community. In this role, WSB regularly gave presentations to the Planning Commission and City Council and participated in developer meetings and City staff meetings as a member of the staff. While the City is not requesting assistance at Planning Commission and City Council meetings, the staff we have proposed is prepared to do so if the City desires. -10 - .. .. .. .. Concept Layouts/ PreIimiruuy Plans AUAR/EAW Review Preliminary Platting Developer's Agreements .... WSB & As.mdales, Inc. .. .. We have included a summary of the activities that we completed as an extension of the Hugo and North Branch staffs, as well as a sample of review documentation for a project in the Ciry of Hugo. This documentation can be found in the Appendix under the "Sample Document" tab. This document will provide you with an example of the level of effort we put into our review projects. We would be happy to provide additional examples if you feel it would be beneficial to your decision-making process. tTl :x: '1:1 t:r:I ~ ...... t:r:I Z n t:r:I Following you will find a summary of the types of tasks we completed as part of our work in Hugo and North Branch, followed by a description of several specific projects. The first stage of development is the planning/concept plan process. We are well versed in providing project support in this area as it relates to streets, utility systems, and transportation networks. We regularly prepare planning documents for transportation and utility systems, which gives us the ability to review development documents quickly and thoroughly. . Provided recommendations for collector road alignments, access spacing, and geometrics . Evaluated conformance to City codes and standards . Analyzed existing surrounding trunk sewer and water systems to ensure demands for new capacities were met, including fire protection . Identified off-site capital improvement needs that may be impacted by the development in question. Evaluation of short and long term constructability with possible financing options are typically provided at this stage. . Reviewed plans for conformance for consistency with Comprehensive Infrastructure Plans . Coordinated agency review (Mn/DOT, County, Watershed) . Considered sustainable opportunities and discussed alternative City standards WSB's staff of traffic engineers and environmental scientists reviewed the environmental documents to verifY that the information provided in these reports was accurate. We provided recommendations to City Staff for revisions. We used our experience to work with the reviewing agencies to anticipate their issues and address them in advance. . Verified that the proposed easements and right-of-way were sufficient to meet the City and County standards for streets and utilities . Reviewed the preliminary plat to verifY they were designed to City standards and included the required information . Analyze the design for offsite impacts and grading/utility means and methods . Provided the City calculations for sanitary, water, and storm sewer area charges based on land use . Calculated the amounts due for street signage, snow plowing, seal coating, off-site roadway, and surface water management -11- .. .11 .. .. Final Platting and Final Construction Plan Review Construction Observation ... WSB &Assodmes,r/tc. . Calculated the amounts for securities and cash escrows from the developer that were due for design, construction observation, the City's legal expenses, and record drawings . Assisted with negotiation of developer contribution to trunk facilities and oversight . Reviewed streets and utilities for conformance with City, County, and MnjDOT standards . Verified that design was coordinated with adjacent City, County, and private development projects . Reviewed and assisted in design for storm water treatment, including trunk storm sewer systems, infiltration basins, storm ceptors, created wetlands, DNR and FEMA flood requirements, box culvert design, hydraulic risk analysis, outlet controls, and water quality treatment requirements . Evaluated and assisted in the design for roundabouts . Held regular meetings with the developer's engineer and City staff, including Public Works, to make certain designs met the City expectations, requirements and future maintenance needs. Public Works staff commented that we were the first to include them in these meetings and appreciative we considered them in the review process to give them a chance to be actively involved. . Provided construction observation on some of the projects to verify that the construction was consistent with the approved construction plans . WSB staff became very familiar with the projects during the review process, so during the construction phase, we were able to proactively address issues before they occurred . Provided weekly reports to the City for construction progress . Tracked quantities and schedule . Monitored materials and soils testing . Provided punch lists for deficient work . Assisted in project close out and warranty . Reviewed record drawings submitted by developers - 12 - .. .. trJ ><: "CI tr:I 2S tr:I Z n tr:I .. .. .. .. Specific Development Experience .. .. I:IJ ><: "0 trJ ~ ....... trJ Z n trJ Water's Edge Development Hugo, MN 450 Acres Residential 1,100 Single/Multi-Family Units Development Review Manager: Jay Kennedy Water Resources Review: Phil Belfiori Traffic Operations Review: Chuck Rickart AUARlEnvironmental: Andi Moffatt A WSB &Associale!i,lnc_ . Involvement started with concept and environmental documentation through preliminary and final platting and construction . Phased development of approximately 1,100 single and multi-family residential units . Project involved construction of a regional system of storm water treatment ponds and infiltration basins, including modifications to the FEMA flood maps. WSB provided the conceptual design of the system, and reviewed the final design . Project included many conservation development techniques, including narrower road widths, infiltration basins, and small lot sizes . Required permit from the Rice Creek Watershed District related to modifications to a branch of Judicial Ditch #3 . Included design and construction of a divided parkway collector roadway that included landscaping and irrigation . Included construction of off-site street and utility improvements. We assisted the City with the negotiations as part of the Development Agreement . Included acquisition of a City well site within the development, as well as the final design and construction of the well and wellhouse. . Coordination with Washington County was required for the access to County Road 8 '_n'"~",-""_"",""",""""",,,,,,,.~ / i r I( IJ ~ "- c-"J \ r .........,'"----_) C,j. J... .-." '..-- '~',-~':::-~::;., O!i!!i "" ~ .~%.. -13 - .. .. .. .. Victor Garden's North Village Hugo, MN 100 Acres Mixed Use 100 Multi-Family Units 130,000 sq. ft. Commercial Development Review Manager: Jay Kennedy Water Resources Review: Phil Belfiori Traffic Operations Review: Chuck Rickart AUAR/Environmental: Andi Moffatt ... WSB &A.','o~ialc",ITlc. .. .. . Project included the construction of mixed residential and commercial uses, including Festival Foods, Kwik Trip, Postal Credit Union, and Red's Savoy Pizza. . The project included a roundabout, which we reviewed in detail with Public Works and Fire personnel to verify that it would operate effectively . Involved significant coordination between the City, WSB, Washington County, and the Developer to ensure that the proposed improvements would be consistent with the improvements to County Road 8 being undertaken at the same time as the development project . The project included the installation of a traffic signal at County Road 8 and Victor Hugo Boulevard, as well as other offsite improvements. WSB assisted the City with the negotiations for funding the proposed signal and offsite improvements as part of the Development Agreement . Coordinated the roadway improvements with the City of Lino Lakes so that the development plans would not compromise the long-term transportation needs of both communities . Completed detailed review of individual site plans within the development from a traffic circulation and site access standpoint. Worked with the developer and their engineer to implement plan modifications that improved circulation, connectivity between adjacent sites, and site . Coordination of new sanitary sewer trunk extension with Met Council, including an area study to determine the long-term capacity necessary to serve property beyond the development . During the plan review process, we worked with the Developer with regard to the watermain and sanitary sewer plans to reduce project costs and simplify maintenance. Our recommendations including alternate routing of the utilities through the private sites, rather than within roadways that were expected to carry large traffic volumes trJ :>< "0 t:r:I ::0 ....... t:r:I Z n t:r:I -14- .. .. .. .. ESSBY Industrial Park North Branch, MN 400 Acres Mixed Use Development Review Manager: Jay Kennedy Assistant Development Review Manager/General Municipal Review: Diane Hankee Water Resources Review: Todd Hubmer Phil Belfiori Traffic Operations Review: Chuck Rickart AUAR/Environmental: Andi Moffatt .... WSB &Associa/cs,l~c. .. .. . WSB worked with the City of North Branch in planning a 400 acre mixed use development which is predominantly zoned industrial . Completed an AUAR to provide the City with important planning tools such as transportation, utility, and storm water management plans . Provided recommendations for phasing of the development based on infrastructure needs . Managed the removal of several buildings with asbestos and implemented a RAP for petroleum contaminated soils . Designed a regional storm water management facility that extends the length of the development. Construction of the regional pond is designed to occur in phases as development progresses and eliminates the need for individual ponds as sites develop. It is also designed as a site amenity including open space and a trail system. Lastly, the soils generated as part of the pond construction are utilized within the adjacent properties to provide adequate building sites consistent with an overall grading plan that we developed for all 400 acres . Project included roundabouts, reconstruction of Chisago CSAH 30 at 400th Street to allow for an at-grade crossing of 400th Street at the BNSF Railroad tracks and planning for a future overpass of 1-35 at 400th to provide a key connection between the east and west portions of the community . Construction of trunk municipal utility infrastructure to serve the development. This includes both onsite and offsite improvements, including the extension of sanitary sewer from the City's Wastewater Treatment Facility. . Designed and managed the construction of various phases of the infrastructure improvements tIj :><: "d trl ~ trl Z n trl 'U :,! ~h.c I II It;- 1 I':~'''; '. I ~~ IT;' 'f:'J"_,,- I~I /1- - "I I" -111'= '1- '1 I! {~;i,' - - 15 - .. .. .. .. North Branch Market Place and Flink Avenue North Branch, MN 30 Acres Commercial 170,000 sq. ft. Mixed Commercial Developmej1t Review Manager: Jay Kennedy Assistantl)evelopment Review Manager/General Municipal Review: Diane Hankee Water Resources Review: Todd Hubmer Phil Belfiori Traffic Operations Review: ChuckRickart Transportation Planning/ Mn/DOT~ County Coordina.tion: Becky Haydon .. .. ~ '\J tr:I ::0 ...... tr:I :z: n tr:I . North Branch Market Place (NBMP) is a 30 acre commercial development accessing TH 95 and near the 1-35 interchange. WSB provided plan review for the private development and designed the public improvements to Flink Avenue . The project has been completed in cooperation with Mn/DOT and the North Branch Market Place (NBMP) development team . The project is part of the overall layout for the TH 95 Interchange project developed in cooperation with the City, Mn/DOT and Chisago County. The layout includes the realignment of Flink Avenue which will result in improve traffic flow and access along TH 95 to minimize congestion in the future as the area develops. . Worked with the City, Mn/DOT, and the developer to install a traffic signal at new Flink Avenue until the TH 95 interchange project is completed. This resulted in a short term compromise, since there are two signals at a closer spacing than typically allowed by MnIDOT. . Worked with the developer to implement the City's comprehensive utility plans within the site to minimize overall cost and provide safe access for the Public Works maintenance staff . Coordinate the storm water management with the future TH 95 bridge improvements . Storm water management for the area was planned to include runoff from the private development and from the current and future public improvements along Flink Avenue and TH 95 -~'-'-~ : ~==:"?:-::::''':'''' i~-~::.-i ;t.::gE:-.::- : ~:===:".~ --..---- t ~i:::-~_::::_ .._---~--- --~---- . =-",,--..o:._"-~-'- , =--==-===- , -.------ '--/ 83::"__ i r.~_ I w ~=- I~-;I- :~__-I I-~ --:e-2.~~ """'l' ... WSB -16- &.4....ociales./nc_ .. .. .. .. References WSB prides itself in completing quality work in a timely manner, but we also take great satisfaction in the connections we develop and maintain with our clients and other agencies. We continually strive to strengthen our partnerships with each client, to bring successful conclusion to the project at hand and to build strong relationships for future mutual benefit. We encourage you to call our references and talk with them directly about our partnerships. Development Review Team References City of Hugo Mike Ericson, City Administrator Bryan Bear, Community Development Director Scott Anderson, Senior Engineering Technician 651. 762.6300 City of North Branch Julie Dresel, PE, City Engineer 651.674.8113 City of Mahtomedi Scott Neilson, City Administrator 651.426.3344 Firm References City of Lakeville Keith Nelson, PE, City Engineer Daryl Morey, Planning Director 952.985.4400 City of Monticello Jeff O'Neill, City Administrator 763.271.3215 ~ WSB -17 - & Associalcs, Inc. .. .. t:rl >< "ij tI1 ~ >-< tI1 Z n tI1 .. .. .. .. Hourly Rates Proposed Fees .. WSB &A..sociall's.lnc_ We have attached our current 2007 and proposed 2008 fee schedule with hourly rates for each employee classification. The hourly rates include all miscellaneous costs such as cell phones, mileage, CADD time, mailing, general correspondence, and word processing. Billing - Billing will occur monthly for all projects. It is important to note that WSB provides a separate invoice for each project that we work on and will work with City staff to determine the appropriate separation(s). This allows for ease of financial tracking, which is particularly important for development projects that have escrow accounts associated with them. Our project management system allows us to include comments on each specific task so that invoices can be more descriptive if the City desires. We have provided a rate category billing table for the staff included in this proposal. We do have other, lower rate staff that could be involved, depending on the tasks we are asked to accomplish. We believe that more experienced staff will provide the most value to the City through the efficient and thorough review of development documentation. -18 - .. .. "rj [Ii [Ii CJ:l n ::r: [Ii t:;I c: r [Ii .. .. .. .. Rate Category Billing Table ~ WSB &As.'odalc",lnc_ Team Member 2007 Hrlv Rate 2008 Hrlv Rate Position Jay Kennedy.... ............................... Principal..... ................ $130 .............$134 Diane Hankee..................... Project Manager..................... $102 .............$105 Jeff Kurth ....................... Graduate Engineer ....................... $74 ...............$76 Kevin Newman ........ Senior Project Manager ..................... $117 .............$121 Joe Ward ............................ Project Engineer ....................... $83...............$86 Nancy Zeigler .......... Senior Project Manager.....................$1l7 .............$121 Jamie Wallerstedt............... Project Engineer ....................... $83...............$86 Chuck Rickart........... ......................Associate ..................... $122 ....... ......$126 Becky Haydon ......... .................. .... .Associate ..................... $122 .............$126 Todd Hubmer ............ ..................... Principal..... ................ $130 .............$134 Phil Belfiori ................................... Specialist.......................$93 ...............$96 Andi Moffatt....................... Project Manager ..................... $109.............$112 Travis Pristed .... .............................. Scientist............ ... ........ $60 ............... $62 Additional Services Steve Ische .....................................Associate ..................... $122 ...... .......$126 Andi Moffatt....................... Project Manager.....................$109 .............$112 Mike RieL............... Senior Project Manager ..................... $117 .............$121 Sabri Ayaz ...................................... Principal..... ................ $130 .............$134 -19 - .. .. ":rj t"I1 t"I1 C/) n :r: t"I1 t::I c::: r-' t"I1 .. .. Principal .. .. "Ij tr1 tr1 Billing CI:l Rate/Hour n ::c tr1 $130.00 U c:: $122.00 r tr1 $117.00 $109.00 $102.00 $93.00 $83.00 $74.00 $66.00 $60.00 $55.00 $48.00 $61.00 $32.00 $136.00 $162.00 .. .. 2007 Rate Schedule Associate Sr. Project Manager Project Manager II Project ManagerlEngineering Specialist III Registered EngineerlRegistered Land SurveyorlEngineering Specialist II Project Engineer/Engineering Specialist lISr. Construction Observer Engineering Technician V/Construction Observer/Grad Engineer Engineering Technician IV/Scientist III Engineering Technician III/Scientist II Engineering Technician II/Scientist I Engineering Technician I Office Technician II Office Technician I Survey (Two-Person Crew/GPS Crew) Survey (Three-Person Crew/Expanded GPS Crew) Costs associated with word processing, vehicle mileage, cell phones, reproduction of common correspondence and mailing are included in the above hourly rates. Reimbursable expenses include costs associated with plan, specification and report reproduction, permit fee, delivery cost, etc. Rate Schedule is .. WSB - 20- .. .. &Assoc;all's,/nc. Sr. Project Manager/Sr. Project Engineer .. .. 'Tj t:r:l t:r:l Billing CI:l RattVHour n :::r:: t:r:l $134.00 t;I c::: $126.00 r t:r:l $121.00 $112.00 $105.00 $96.00 $86.00 $76.00 $68.00 $62.00 $56.00 $49.00 $62.00 $33.00 $140.00 $167.00 .. .. 2008 Rate Schedule Principal Associate Project Manager II/Project Engineer III Project Manager/Project Engineer II/Engineering Specialist III Project EngineerlRegistered Land Surveyor/Engineering Specialist II Graduate Engineer II/Engineering Specialist IISr. Construction Observer Graduate Engineer/Engineering Technician V/Construction Observer Engineering Technician IV/Scientist III Engineering Technician III/Scientist II Engineering Technician II/Scientist I Engineering Technician I Office Technician II Office Technician I Survey (Two-Person Crew/GPS Crew) Survey (Three-Person Crew/Expanded GPS Crew) Costs associated with word processing, vehicle mileage, cell phones, reproduction of common correspondence and mailing are included in the above hourly rates. Reimbursable expenses include costs associated with plan, specification and report reproduction, permit fee, delivery cost, etc. Rate Schedule is .. WSB - 21- .. .. &A,umdalcs, Jnc_ City of Arden Hills, Minnesota Request for Proposals (RFP) for Residential Recycling Services September24,2007 City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112 City of Arden Hills Table of Contents 1. INTRODUCTION ......................................................................................................1 2. BACKGROUND ........................................................................................................1 3. DEFINITIONS ...........................................................................................................2 3.1 Aluminum Cans . ....................................................... ......... ...................................2 3.2 Contractor. ........................................................................................................ ..... 2 3.3 Curbside ............. ............. ........... ............ ....... ........................................................ 2 3.4 Curbside Recycling Bins ........... .............................................................. .... ..... ..... 2 35 Curbside Recycling Service .................................................................................2 3. 6 Fiber........................ ..................................................... ......................................... 2 3.7 Glass Jars and Bottles ...........................................................................................2 3.8 Mixed Mail/Junk Mail/Household Paper.............................................................. 2 3.9 Markets.............................................................. .... ................................................ 3 3.10 Materials Recovery Facility (MRF) ...................................................................3 3.11 Multi-Family Dwellings (MFD) .........................................................................3 3.12 Non-Targeted Materials ...................................................................................... 3 3.13 Old Boxboard (OBB) .... ......... .......................... .... ...... ................................. ........ 3 3.14 Old Corrugated Cardboard (OCC)...................................................................... 3 3.15 Old Magazines (OMG) ....................................................................................... 3 3.16 Old Newspaper (ONP) ........................................................................................ 3 3.17 Plastic Bottles... .... .... .......................................................... .......... ............... ........ 3 3.18 Process Residuals ..... ......................... .................... .......... ............................ ........3 3.19 Processing ........... ............... ............... ............... ....................... ........... .... ......... ....4 3.20 Processing Center..................................................................... ........................... 4 3.21 Proposal Scenarios ................................. ...... .... .... ............................................... 4 3.21.1 Dual-Stream, Every Week Collection Scenario......................................4 3.21.2 Single-Stream, Every Other Week Collection Scenario .........................4 3.21.3 Single-Stream, Every Week Collection Scenario ................................... 5 3.22 Recyclable Materials or Recyclables .................................................................. 5 3.23 Recycled Content Products ................................................................................. 5 3.24 Steel Cans ............................................................................................................5 3 .25 Waste.................................................................................... ........................... .... 6 4. GENERAL REQUIREMENTS FOR RESIDENTIAL COLLECTIONS............ 6 4.1 Contractor Service Requirements ......................................................................... 6 4.2 Contractor Licensing Requirements ..................................................................... 6 4.3 Collection Vehicle Equipment Requirements.......................................................6 4.4 Personnel Requirements. ......................... .............................................................. 6 45 Point of Collection ....................... .............. ................. .... ..................... ..... ............7 4.6 Recycling Containers ............................................................................................ 7 4.6.1 Dual-Stream Collection.............................................................................. 7 4.6.2 Single-Stream Collection..... .......... ....... ................. ..................... ..... ...........7 4.7 Co llection.................................................. ............................................................ 8 4.7.1 Dual-Stream Collection. ...... ................................................. ..... ...... ........... 8 11 RFP for Residential Recycling Services 4.7.2 Single-Stream Collection............. ............... .... ........... .................................8 4.7.3 Future Source-Separated Organics Collection ...........................................8 4.8 City Retains Right to Specify Resident Preparation Instructions .........................9 4.9 Procedure for Unacceptable Recyclable Materials ...............................................9 4.] 0 Collection Days ....... ......................... ............... ..... ...............................................9 4.]] Collection Hours .................................................................................................9 4.12 Cleanup Responsibilities........................ ............................................ .................9 4.13 Missed Collection Policy & Procedures ...........................................................10 4.14 Non-Completion of Collection and Extension of Collection Hours .................10 4.15 Severe Weather .................................................................................................10 4.16 Holidays .................. ......................... .................................................................1 0 4.] 7 Weighing of Loads............................................................................................ 10 4.18 Unauthorized Collection...................................................................................11 4.19 Utilities. .... ........................................ ....... ............. .............. ............................... 11 4.20 Damage to Property ..........................................................................................11 4.21 Municipal Facilities ..........................................................................................11 4.22 Reports and Meetings .......................................................................................11 4.22.1 Materials Reports....................................................................................11 4.22.2 Monthly Customer Relations Report...................................................... 12 4.22.3 Annual Performance Review Meeting ................................................... 12 4.23 Publicity, Promotion, and Education................................................................ 12 5. MATERIALS PROCESSING AND MARKETING ............................................13 5.1 Processing Facilities Must Be Specified .............................................................13 5.2 Lack of Adequate Market Demand ..................................................................... 13 5.3 Estimating Materials Composition as Collected................................................. 14 5.4 Estimating Process Residuals .............................................................................14 5.5 Performance Monitoring .......................... ........ ..... ................... ........... .......... ...... 14 5.6 End Markets ...................................................... ..... .............. ............................... 14 6. PAYMENT AND DAMAGES ................................................................................]5 6.1 Compensation for Services .................................................................................15 6.2 Revenue Sharing ........................................... .... ......... .................................. ....... 15 6.3 Liquidated Damages ...........................................................................................16 7. INSURANCE AND OTHER LEGAL REQUIREMENTS ..................................]7 7.] Insurance ............................................................................................................. 17 7 .2 Worker's Compensation ........................ ..... ...... ............ .................. ........ ............. 17 7.3 Employee Working Conditions and Respondent's Safety Procedures................ 17 7.4 Equal Opportunity........... .... ........................ .............................. .... ........... ........ ... 18 7.5 Compliance with Laws & Regulations ...............................................................18 7.6 Governing Law ...................................................................................................18 7. 7 Waiver .... ............................. .... ............... ................... .............................. ............ 18 7.8 Termination........... ...................... .... ..................... ....................... ....... ......... ........ 18 7.9 Severability ...... ......... ..... .... ......................................................... .................... .... 19 7.10 Accounting Standards ... ................. ............... ..... ............. ........... .................... ... 19 7.11 Retention of Records ........................................................................................19 7.12 Data Practices.................................................................................................... 19 III 7.13 Inspection of Records and Disclosure...............................................................]9 7.] 4 Independent Contractor........... ........................................... ............................... ] 9 7.] 5 Transfer of ]nteresl........... ....... ........ ................................................... ............... 20 7.]6 Non-Assignability and Bankruptcy................................................................... 20 7.] 7 Indemnification ................... ..... .... ....... ....................... .... .......................... .........20 7.18 Performance & Payment Bond .........................................................................20 7.] 9 Conflict of Interest ..... .... .................................. ......... .......... ................. .............2] 7.20 Entire Contract ............... ...................... .............................................................2] 7.2] Contract Conditions .................................................... ............ ................. ......... 2] City of Arden Hills 8. TERM OF CONTRACT .........................................................................................21 9. SUBMITTING PROPOSALS ................................................................................. 21 9.] Notification of Intent ............... ..... ................. ....................... .... ........ ................... 2] 9.2 Requests for Clarification .................... ............. ................................ .... .......... .... 2] 9.3 Contractors May Team with Other Companies ..................................................22 9.4 How to Submit Proposals....................................................................................22 9.5 Proposal Content. ................ ...................... ........... .................................. .... .........23 9.6 Curbside Dual-Stream Every Week Collection Proposal Scenario ....................23 9.7 Single-Stream Proposal Scenario........................................................................ 23 9.8 Price Worksheet. ........................................ ........ ........... .... ................. ........... ......23 9.9 Proposals May Be Rejected in Whole or Part.....................................................24 9.10 RFP and Proposal to Become Part of Final Contracl........................................24 10. CONTRACTOR SELECTION PROCESS...........................................................24 10.] Contractor Selection Process ............................................................................24 ] 0.2 Evaluation Criteria ..... ........ ............................ ................................ ... ...... .......... 25 Attachment A - Map of Arden Hills Attachment B - Arden Hills Recycling Tonnage Estimates by Material Type for 2006 Attachment C - Price Worksheets IV RFP for Residential Recycling Services 1. INTRODUCTION This request for proposals (RFP) defines the service standards, specifications and proposal requirements of the residential recycling collection program for the City of Arden Hills (City). The City seeks to enter into a recycling contract with a company that has the resources and ability to provide residential recyclable materials collection services for the City. It is the intent of the City to accept and evaluate proposals for residential recycling services including collection, processing, and marketing. The goals of the City are to maximize the fullest recovery possible of recyclable materials from all residents in the City and to achieve the most cost-effective solution. The City encourages Proposers to submit their best proposal possible. The requirements within this RFP may be altered by Proposers if proposals explicitly describe the change, rationale and price implications. For example, the "dual-stream proposal" scenario assumes the City's current dual-stream collection/processing recycling method. Proposers may propose a "single- stream proposal" scenario or they may propose on both scenarios. Each scenario proposed must have a distinct, associated price. 2. BACKGROUND The City's current recycling contract requires single-family households to be serviced on a weekly basis. Households north of lnterstate 694 have recyclable materials collected every Wednesday and households south of 1-694 have recyclable materials collected every Tuesday (see Attachment A for a map of Arden Hills). The current population of Arden Hills is estimated to be 9,692 persons. The City has approximately 2,560 single-family housing units included as part of the City's residential recycling program. Three buildings in the City (one senior living building, one condominium complex, and one apartment building) totaling 173 units contract individually with one private hauler for once weekly dual-stream collection of recyclable materials. There is one manufactured home park (Arden Manor) in the City, consisting of 294 housing units. The park owner contracts with one hauler for the collection of recyclable materials from these units. The City currently has a dual-stream recycling program for fiber and rigid containers. Paper products accepted in the City's recycling program include old newspaper (ONP), old magazines (OMG) including catalogs, old corrugated containers (OCC), mixed mail, old boxboard (OBB), phone books, and pop and beer carriers/cartons. Rigid containers accepted in the program include glass food and beverage containers, plastic bottles with a neck, steel and tin cans, aluminum foil, and aluminum cans. These materials are described in more detail in Section 3, "Definitions ". The City is billed $2.05 per household for residential recycling services by its current contractor. The total quantity of recyclable materials collected from the single-family curbside program in 2006 was 861 tons. The breakdown of 2006 recyclable materials collected in Arden Hills, by material type, can be found in Attachment B. City of Arden Hills 3. DEFINITIONS Disposable containers fabricated primarily of aluminum, commonly used for soda, beer, juice, water or other beverages. 3.1 Aluminum Cans 3.2 Contractor The City's recycling service contractor under the new contract beginning operation on March 1,2008. 3.3 Curbside The area of public right of way between the property line and the curb or edge of the street, but not on the street. 3.4 Curbside Recycling Bins Uniform curbside recycling bins (e.g., I8-gallon, green plastic recycling tubs) in which recyclable materials can be stored and later placed for curbside collection, as specified by the City. Also pertains to bins, boxes, bags or other containers used by residents to separate their recyclable materials. (The current I8-gallon curbside bins were originally distributed free of charge to all households by the City. Residents may now purchase bins for $550 each, plus tax.) For single-stream collection proposals, see Section 4.6.2 of this RFP which states that the Contractor shall provide containers for use in single- stream collection programs. 3.5 Curbside Recycling Service The recycling collection service, together with related public education and other customer services, specified within this RFP utilizing curbside recycling pickup. 3.6 Fiber As part of a dual-stream collection program, fiber includes the following paper items: old newspaper (ONP) including inserts; old magazines (OMG) including catalogs; old corrugated containers (OCC); mixed mail; old boxboard (OBB); phone books; and pop and beer carriers/cartons. 3.7 Glass Jars and Bottles Unbroken glass jars, bottles, and containers (lids/caps and pumps remo\ed) that are primarily used for packIDg and bottling of food and beverages. 3.8 Mixed Mail/Junk Mail/Household Paper Mail, advertisements, office paper, school papers, envelopes, etc. Shredded paper is acceptable in closed paper bags, no plastic bags. 2 RFP for Residential Recycling Services 3.9 Markets Any person or company that buys (or charges) for recycling of specified materials and may include, but are not limited to: end-markets, intermediate processors, brokers and other recyclable material reclaimers. 3.10 Materials Recovery Facility (MRF) A recycling facility in which recyclable materials are processed. The facility will conform to all applicable rules, regulations and laws of state, local or other jurisdictions. 3.11 Multi-Family Dwellings (MFD) Any building used for residential purposes consisting of five or more residential units is considered multi- family dwellings (MFDs) and are considered commercial property. Garbage and recycling collection services are contracted directly by the building owners. The City's ordinance is scheduled to be amended by the end of 2007 to ensure all residents have access to recycling, including those living in multi- family complexes. 3.12 Non-Targeted Materials Non-recyclable materials that are not included in the City's recycling program. Examples of typical non-targeted items include (but are not limited to): pumps on plastic bottles, ceramic material, frozen pizza boxes, plastic tubs such as butter or whipped topping containers, electronics, etc. 3.13 Old Boxboard (OBB) Boxes including cereal, cake, chip, cracker boxes, etc. Does not include boxboard containers used forrefrigerator or freezer food product storage. 3.14 Old Corrugated Cardboard (OCC) Cardboard material with double wall construction and corrugated separation between walls. Does oot include plastic, wax or other coated cardboard. 3.15 Old Magazines (OMG) Glossy and non-glossy magazines and catalogs. 3.16 Old Newspaper (ONP) Newspapers including inserts. 3.17 Plastic Bottles Plastic bottles with a narrow neck including milk jugs, laundry bottles, ketchup bottles, pop bottles, etc. Wide neck containers such as butter or whipped topping containers, are not included. 3.18 Process Residuals The normal amount of material that cannot be economically recycled due to material characteristics such as size, shape, color, cross-material contamination, etc. and must be disposed as mixed municipal solid waste. Process residuals include subcategories 3 City of Arden Hills including, but not limited to, bulky items, contaminants, sorted tailings, floor sweepings and rejects from specific processing equipment (e.g., materials cleaned from screens, etc). Process residuals does not include clean, separated products that are normally processed and prepared for shipment to markets as commodities but are of relatively low-value because of depressed market demand conditions. 3.19 Processing The sorting, volume reduction, baling, contaimnent or other preparation of recyclable materials delivered to the processing center for transportation or marketing purposes. 3.20 Processing Center A recycling facility in which recyclable materials are processed. The facility will conform to all applicable rules, regulations and laws of state, local or other jurisdictions. 3.21 Proposal Scenarios Three different recycling collection'processing scenarios are identified by the City for purposes of this RFP. Proposers may submit pricing on multiple scenarios. 3.21.1 Dual-Stream, Every Week Collection Scenario Dual 4 .. .. Joe Ward" PE Education: Bachelor of Science in Civil Engineering Iowa State University Registration: Minnesota Associations: American Water Works Association Water Environment Federation .A. WSB &A".mt;iales, (f1C. Experience: Joe has four years of experience in the civil engineering field. He has wastewater design experience in treatment, lift station, sanitary sewer collection systems, and sanitary sewer system comprehensive system plans designed with SewerCAD. Joe is experienced with WaterCAD and his water design experience includes treatment, distribution system improvements, water system comprehensive plans designed with WaterCAD, and water conservation and emergency plans. Joe has completed many development reviews for both water and wastewater systems, including water and sanitary sewer elements for EAWs and AUARs. Selected Project Experience: . Water Treatment Plant No.2 design and construction management, North Branch, MN . Sanitary sewer collection system, lift station, and treatment design, Palmer, IA . Wastewater treatment capacity improvements design, Radcliffe, IA . Water distribution improvements design, Humeston, IA . Water Tower No.1 rehabilitation, Mahtomedi, MN . Chanhassen/Wood Haven Interconnect construction management, Shorewood, MN Comprehensive Water System Plans . Rosemount, MN . Minnetrista, MN Comprehensive Sanitary Sewer System Plans . Rosemount, MN . Shakopee, MN . Minnetonka, MN Water Conservation and Emergency Plans . Rosemount, MN . Circle Pines, MN Feasibility Studies . United Health Group traffic and infrastructure study, Minnetonka, MN . NE/SE Connection, Shorewood, MN (WaterCAD) . Downtown redevelopment, Rosemount, MN (WaterCAD) . Air Cargo facility, Rosemount, MN (WaterCAD) . Trunk sewer capacity analysis, Northfield, MN . Well House No.1 modifications, Minnetrista, MN .. .. 'i:l ::0 o L; t:r:I n >--3 trJ Z Cl ...... Z t:r:I t:r:I ::0 .. .. .. .. Jamie Wallerstedt, EIT Lift Station Design: . Foss Road Lift Station, St. Anthony Village, MN . 129m Street Lift Station, Hugo, MN Comprehensive Water System Rate Study: . North Branch, MN Comprehensive Sanitary Sewer System Plan: . Chanhassen, MN WaterCAD Analyses: . Wyoming, MN . Hugo, MN . Mahtomedi, MN . North Branch, MN Street and Utility Feasibility, Design, and Construction Management: . 400th Street/CSAH 30 Street and Utility Improvements, North Branch, MN . 383rd Street Improvement Project, North Branch, MN . 102nd Street North Street and Drainage Improvements, Grant, MN . Roger Johnson Memorial Park Improvements, North Branch, MN . Ash Street and Golden Avenue Street and Utility Improvements, North Branch, MN . Bald Eagle Industrial Park Improvements, Hugo, MN . Fort Snelling Athletic Complex, Minneapolis Park and Recreation Board, St. Paul, MN Selected Project Descriptions: Comprehensive WaterCAD Model Update, Wyoming, MN Project Engineer responsible for creating a working WaterCAD model of the City's water distribution system. The project included updating citywide water demands, supply, and storage along with an analysis of the City pressures and fire flows. Additional water models were completed for the cities of Mahtomedi, Hugo, and North Branch. Water Tower No.2, Mahtomedi, MN Project Engineer responsible for the construction management of an elevated water storage tank. Project incll\ded shop drawing review and coordination between the contractor and the City. Water Treatment Plant No.2, North Branch, MN Project Engineer responsible for preliminary and final design of pumping systems, ground storage, and site layout for the treatment plant in North Branch. ... WSB &Assoda/u.fnc. .. - .. , '"d . .. ;;0 o c..... i:Tj n >--J ~: tT:I Z II C'l >-< Z i:Tj i:Tj ;;0 1 , j .. .. .. .. Jamie Wallerstedt, EIT Education: Bachelor of Science in Civil Engineering University of Minnesota Associations: American Waterworks Association Water Environment Federation Central States Water Environment Association .. WSB &A,'iSocia/<:s,ll1c. Experience: Jamie has six years of civil engineering experience. She performed her civil engineering internship with WSB, started full-time in our Municipal Group, and currently works in our Water and Wastewater Group. Her experience in municipal engineering includes design and construction management of storm sewer systems, sanitary sewer systems, water distribution systems, roadway improvements, and site grading. Jamie's water and wastewater experience includes the design of lift stations and treatment systems, comprehensive planning, and infiltration and inflow studies. To assist with comprehensive planning and distribution system analyses, Jamie utilizes the WaterCAD software program. Jamie's responsibilities include construction management, design and preparation of project plans and specifications, and feasibility reports. Selected Project Experience: Water Emergency and Conservation Plans: . Mahtomedi, MN Infiltration and Inflow Studies: . Minnesota Zoological Gardens, MN . South St. Paul, MN . Excelsior, MN . Chanhassen, MN . St. Anthony Village, MN Municipal Production Wells: . Well No.5, North Branch, MN . Well No.5, Hugo, MN . Well No.6, Mahtomedi, MN Municipal Water Towers & Ground Storage Facilities: . 500,000 Gallon Water Tower No.2, Mahtomedi, MN . 1,000,000 Gallon Ground Storage Reservoir, North Branch, MN . 1.5 Million Gallon Water Tower No.4, Hugo, MN . Water Tower No.1 Rehabilitation, Mahtomedi, MN Water System Plans and Trunk Watermain Studies: . North Branch, MN . Hugo, MN . Mahtomedi, MN . Wyoming, MN Water Treatment Facilities: . Water Treatment Plant No.2, North Branch, MN Pressure Reducing Valve Stations: . Mahtomedi, MN . Shorewood, MN .. .. ""d ~ o c...., tTJ n >-3 trJ Z Cl ..... Z tTJ tTJ ~ .. .. .. .. Joe Ward~ PE ... WSB &Assoclates,lnc_ Lift Station Design . Lift station improvements, Isle City, MN . CSAH 39 and Meadow Oaks, Monticello, M . Wildridge 4th Addition lift station improvements, North Branch, MN . Rehabilitation ofLift Station No. 12, Shorewood, MN Rate Study . Water and sanitary sewer rate analysis, Rosemount, MN Development Reviews for Water and Wastewater System Service . Minnetrista . Rosemount . Monticello . Shorewood .. .." 11 '"d ;A1 o c..... tr:I n >--'I " trJ zn o ...... Z tr:I tr:I ;A1 ~. 11 j , , .. .. Example Documentation April I, 2004 Ms. Kendra Lindahl, AICP Hugo City Planner 650 Butler North Building 510 First Avenue North Minneapolis, MN 55403 Re: Preliminary Plat Review Waters Edge South WSB Project No. 1250-34 Dear Ms. Lindahl: We have reviewed the Preliminary Plat application for the above-referenced project. In particular, we reviewed the following plans related to this particular request: I. Waters Edge South Plat Dated March 11,2004. 2. Waters Edge South Grading Plan Dated March 22,2004. 3. Waters Edge South Preliminary Utility Plan Dated March II, 2004. 4. Waters Edge South Preliminary Landscaping Plan Dated March II, 2004. 5. Waters Edge South Drainage Calculations Dated March 2004. 6. Waters Edge South Preliminary Wetland Delineation Report Dated February II, 2002. 7. A Geotechnical Report for Waters Edge South Preliminary Plan Dated November 23,2001. Our comments regarding this request are as follows: Preliminary Plat 1. All drainage and utility easements need to be clear! y identified. At a minimum, the ponds and wetlands should have drainage and utility easements encompassing the 100-year HWL. Any sanitary sewer, storm sewer, or water main outside the road right-of-way needs to have a minimum 20-foot drainage and utility easement. Gradinl!lStorm Drainae:e 2. As indicated in the soils report prepared by GME Consultants, Inc. dated 11/23/2001, there are substantial areas of peat and/or organic silt on site. These materials will not be allowed for embankment areas or within roadway subgrades. P:\Arden Hills\Tech Svcsfor TCAAP - 233-07fJv!xample carr.doc Ms. Kendra Lindahl April 1, 2004 Page 2 3. The regional ponds along the east side of the site will require some additional modification to provide appropriate regional treatment prior to discharging to the main branch of Clearwater Creek. The ponds will need updated outlet structures consistent with city standards, additional grading, and additional storage as specified in Comprehensive Stormwater Management Plan. 4. The applicant has agreed to partner with adjacent land developers to complete the area-wide Clearwater Creek floodplain map revision applications for this section of the City. We will provide assistance as needed during this process. 5. The Parkway design needs to comply with State-Aid requirements since the roadway will likely be added to the City's State-Aid system in the future. There are design modifications required regarding the side slopes adjacent to the roadway and the minimum street grades. As we discussed at an earlier meeting with the applicant, the typical section for the Parkway median should be modified to capture water within the median to provide maximum infiltration opportunity and minimize the number of required catch basins within the roadway. 6. The City understands that the applicant has received a waiver of onsite infiltration requirements from RCWD. 7. We provided detailed comments to the applicant regarding locations where required low floor elevations will need to be higher than shown due to floodplain, groundwater, or stormwater bounce. 8. We provided detailed comments regarding locations where required Drainage and Utility Easernents need to be provided. Streets and Utilities 1. The southern portion of Everton A venue will become an urban-section roadway once additional development occurs along the corridor. The timing of constructing tbe urban-section roadway will be based on the timing of other development in the area, so the Planning Commission and City Council should consider requiring that the applicant pave Everton A venue from CR 8 to the north end of Block 1, at minimum. Since the roadway will essentially be temporary in nature, the upgrade can consist of shaping the existing gravel surface, and providing a bituminous surface. Since the long-range plans for this portion of Everton A venue include the construction of an urban section roadway, the Planning Commission and City Council should consider requiring the applicant to finance the eventual upgrade of the roadway along the western plat frontage. This would amount to providing the funding for one-half of the cost of a standard City street with a credit provided based on the cost of the temporary paving. This concept is consistent with that required as part of the recently-approved Northern Pines development and that suggested as part of the proposed Powers/Neeser Project. P:\Ardell Hills\Tech Svcsfor TCAAP - 233-070\example carr.doc Ms. Kendra Lindahl April I, 2004 Page 3 9. The Parkway will be extended to the southern boundary of the plat. The Parkway will be extended to CR 8 in the future to a signalized intersection. The time line for the roadway connection is not set; however, it is anticipated that the connection will be completed within the next one to two years. The roadway connection and CR 8 intersection location are consistent with the Everton Avenue AUAR. 10. Soil borings and street design calculations need to be submitted for review for Wood Duck Parkway to verify that the section is consistent with State-Aid standards. All other streets must meet the City of Hugo's standard section. II. The Metropolitan Council Environmental Services (MCES) is planning to construct an additional interceptor line essentially parallel to the existing line located along the east property boundary of the proposed plat. The Parkway right-of-way has been identified as a potential location for the new pipe. City staff is currently working with the MCES and the applicant to coordinate the construction of the new interceptor concurrently with the development of the proposed plat as well as the plat for Water's Edge North. 12. The City's Comprehensive Water Supply Plan identifies this area for a potential new well site. The applicant has included three potential sites within the plat that the City could utilize for this purpose. 13. The plans include extension of a 24" diameter trunk watermain following the Parkway alignment from the City water tower within the Water's Edge North plat to the east edge of the Waters Edge South plat. The 24" diameter trunk watermain will need to connect to the existing watermain near the City's Well No.3. The connection at the well is necessary as part of this plat to provide adequate water service and is consistent with the requirements of the City's Comprehensive Water Supply Plan. 14. Additional trunk water mains and sanitary sewers will be necessary within the plat to provide for adequate service within and adjacent to the plat consistent with the City's Comprehensive Plans. The exact size and locations will be finalized with the applicant as part of the final plan preparation. We have provided additional, detailed technical comments directly to the applicant. These issues are generally routine in nature and do not require formal consideration by the Planning Commission and City Council. P:\4.rdell Hills\Tech Svcsfor TCAAP - 233-07fJ..example corr.doc Ms. Kendra Lindahl April 1, 2004 Page 4 Thank you for the opportunity to comment on this application. If you have any questions or items you wish to discuss, you can contact me at 763-287-7192. Sincerely, WSB & Associates, Inc. Jay Kennedy, P.E. City Engineer cc: Scott Anderson, City of Hugo Chris Petree, City of Hugo Michele Lindau, City of Hugo Phil Belfiori, WSB & Associates, Inc. Joe Lux, Washington County Transportation Mike Brandt, John Oliver & Associates, Inc. Mark Erichson, WSB & Associates, Inc. P:'lArden Hills\Tech Svcsfor TCAAP - 233-07rJ..example corr.doc