HomeMy WebLinkAbout382 (2008)lt
EN HILLS
CITY OF ARDEN HILLS
COUNTY OF RAMSEY
STATE OF MINNESOTA
ORDINANCE NO. 382
A Special Ordinance
Relating to Fees Payable within the City of Arden Hills for 2008
The City Council of Arden Hills hereby ordains that Appendix "A" containing the Fee
Schedule for Calendar year 2008 is hereby adopted, and made part of the Municipal Code.
Effective Date: This ordinance shall become effective the day following its publication.
Adoption Date: Passed by the City Council of the City of Arden Hills on the 10th day of
December, 2007.
ATTEST:
6" �
Michelle A. Wolfe, Administrator
Publication Date: Published on the 19`x' day of December, 2007.
-ARQEN HILLS
City of Arden Hills
Ordinance 382 — Appendix A
2008 Fee Schedule
(Effective January I, 2008)
�. ; �1;dminisElratiue
Dogs/Cats - Licenses
2 Year (Pro -rated for second year
$25.00
- ..
. -@_$12.50)
Dogs/Cats Dupliicate Tags
Each
$6.00
Dogs/Cats77� Boarding
Daily
$18.00
Dogs/Cats Impoundment Fee
-
$42.00
Dogs/Cats - Surrender Fee
Each
-- --
$24.00
Dogs/Cats - Residential Kennel
Annual
$20.00
License
Dogs - Cats Dangerous Dog Fee
Annual
- ---
$60.00
Copying - Minutes, City Council
Annual
$66.00
Meetings
Copying Minutes, Planning
Annual
$53.00
Commission Meetings
Copying - Agendas, City
Annual
$13.00
Council Meetings
Copying - Agendas, Planning
pi
-
Annual
- $6.- 50
Commission Meetings
Copying - Agenda Packets, City
Annual
Cost based on per sheet, staff
Council Meetings
labor, & postage
Copying - Agenda Packets,
Annual
Cost based on per sheet, staff
Planning Commission
labor, & postage
Copying General
Per Side (Any Size)
$0.25
-
Assessment Search
H
Per alf Hour
$50 00
> I building Canslructi6n
Building Permits - Permit Fee
Fees based on Table I of 1997
UBC and are determined by the
City's Building Official
Building Permits - Plan Review
65% of Building Permit Fee
Fee
Building Permits - Reinspection
$35.00
Building Permits - State
.0005 x Project Value or $0-50,
Surcharge -
whichever is greater
Building Permits - Manufactured
Home Location Permit
Building Pennits nits ---swimming
Pool
Demolition Permits
Plumbing Permits - Minimum
Fee
icludes state surcharge)
$52.00
Pagel of 8
Plumbing Permits Residential
- -- _-- -- .-.
........- --- -
1.25% of Project Value
-- - -
Plumbing Permits Non-
_
1-25% of Project Value + $50.00
Residential
Plumbing Permits State
.0005 x Project Value or $0.50,
Surcharge
j whichever is greater
Electrical Permits - Minimum
T
$35.00
Fee
------ ---_..
-------
Electrical Permits -Maximum
$150.00
Single Family Dwelling Fee
Electrical Permits" State
J$0.50
Surcharge
Electrical Permits - General
See Exhibit "A" for additional
____
-
electrical permit fees
Mechanical Permits -Minimum
$36.00
Fee
Mechanical Permits -Residential
1 2% of Project Value
Mechanical Permits -Non-
1.25% of Project Value + $50.00
Residential
Mechanical Permits -State
0005 x Project Value or $0.50,
Surcharge
whichever is greater
--
Fire Protection Permits - Permit
--
--- ....... -- - -- ._.
Fees based on Table IA of 1997
Fee
i UBC and are determined by the
City's Building Official
Fire Protection Permits - Plan
65% of Permit Fee
Review Fee
Fire Protection Permits -
$35.00
Reins ection
Fire Protection Permits -State1
.0005 x Permit Fee or $0.50,
Surcharpee _
whichever is greater
_i
Imo. �Lignox I icensmg-
On -sale _ _ _
1,99_9 square feet (SF) or less
$3,3_00.00
On sale
2,000 (SF) - 2,9999 (SF)
_ _
$4,400.00 _
On -sale
----
3,000 (SF) - 3,9999 (SF)
$5,500.00
—
On -sale
4,000 (SF) or more
-----
$6,600.00
On sale, Sunday
$200.00
Off -sale
$200.00$200.00
Club Fee
--
$300.00
On -sale, Malt Beverage
$120.00
Off -sale, Malt Beverage
$40.00
On -sale, Wine
$2,000.00 (or half of on -sale
license fee, whichever is less)
Strong Beer
No Charge (as part of On -Sale
Wine License)
Investigation Fee
$150.00
Int 1VIa�Zs anti 1Qcdrrtance�
77,
Zoning Ordinance
$42.00
Municipal Code
! $107.00
Comprehensive Plan
_P -
- ---
$62.00
- -- — - --
Page 2 of 8
Street
8.5x 11
11 x 17
1x1
Ball Field Rental, Unlighted
Ball Field Rental, Lighted
Warming House Rental/Iee Rink
Rental
Picnic Shelters, Resident
Picnic Shelters — Non -Resident
— Resident
Picnic Pavilions —
Additional Picnic Tables
Community Garden Plot — One
Plot
Community Garden Plot —
Second Plot
Room Rental — City Hall,
Community Room
Room Rental — Cil
Conference Room
Room Rental — Damage Deposi
Equipment Rental, DVD, VCR,
T.V.
Pe_r D_ay___
Per Day
Only allowed during non-public
use hours.
Per Day, Includes up to 3 picnic
tables & 1 trash container
Per Day, Includes up to 3 picnic
tables & 1 trash container
Per Day, Includes up to 5 picnic
tables & 3 trash containers
Per Day, Includes up to 5 picnic
tables & 3 trash containers
F o- r every 2--ex-bra-tables
1 additional trash container for
every 2 additional tables
Annual
Annual
Per Day (Scheduling a room after
regular hours is contingent upon
the presence of a city employee;
In the event staff is not available,
the City reserves the right to
deny application)
Per Day (Scheduling a room after
regular hours is contingent upon
the presence of a city employee;
In the event staff is not available,
the City reserves the right to
deny application)
Based on number of copies and
staff time
$35.00
---- -- $75.00--------
$25.00 + $100.00 damage
deposit & $50.00 key dep(
$35.00
$50.00 + $100.00 damage
deposit & $50.00 key dep4
$65.00 + $100.00 damage
deposit & $50.00 key dept
$5.00
No additional cost
$35.00
$17.50
Daytime usage, no charge
Army National Guard, no charge
AH Government Groups, no
charge
Resident, Non-profit, $60
Resident, For-profit, $70
Non -Resident, Non-profit, $100
Non -Resident, For-profit, $130
Daytime usage, no charge
Army National Guard, no charge
AH Government Groups, no
charge
Resident, Non-profit, $25
Resident, For-profit, $30
Non -Resident, Non-profit, $40
Non -Resident, For-profit, $50
$100.00
$10.00
Page 3 of 8
Preliminary Plat
Consulting fees and minimum
$400.00 + $25.00/lot
$500.00 administrative escrow
-2525--25.25---2525-2525._.-
Final Plat
- 25 25-2525--2525 2525-
Consulting fees and
-� ---2525--2525 2525 2525
$200.00 + $25.00 lot
administrative escrow
Lot Split/Minor Subdivision
25'25 2525-- 2525 25_25-
Consulting fees and minimum
__ 2525- - 2525 2525--- __..
$325.00
$300.00 administrative escrow
Rezoning
Consulting fees and
--------------------
$450.00
administrative escrow
Comprehensive Plan Amendment
_
Consulting fees and
$450.00
administrative escrow
Var- -- 2525
ianc-e
Consulting fees and
$325..00
administrative escrow
-- ------2525-- - 2525-
Conditional Use Permit or
2525 - - 25
Consulting fees and
25----2525----
$350.00
Amendment
-----------..2525-----2525---
administrative escrow
2525--2525 -2525--2525
---2525--2525 -2525--2525----
Planned Unit Development
Consulting fees and minimum
$600.00 Master + $200.00 Final
$500.00 administrative escrow
Planned Unit Development
Planned Unit Development
Consulting fees and
$350.00
Amendmentadministrative
2525---
escrow
�
__..- ..._ ... -2525--2525 2525
Vacation of Easement
2525- - - - 2525
Consulting fees and
2525 2525-- 2525-- 25 25-2525----
$300.00
administrative escrow
Site Plan Review
Consulting fees
$400.00
Site Plan Review, Fence or Sign
- 2525- 2525--2525
Consulting fees
2525-- 2525
$250.00
2525--- - -..
Zoning Code Amendment
Consulting fees and
$450.00
2525--
administrative escrow 2525
'- -
Zoning Letter
Per 1/2 hour
$50.00 + $50.00/half hour after 1
hour of staff research time
Land Use Requests - Not
---2525 2525 2525
Consulting fees and
2525 - - 2525- 2525 -25252525--2525----
$150.00
Already Specified
administrative escrow
Zoning Permit - Fence
$15.00 for first 100 lineal feet +
Construction
$6.00 each additional 100 lineal
2525--- _ _ 2525 -
2525 2525--- 2525 _
feet, or fraction thereof
Zoning Permit - Driveway
$18.00 for first 1,000 square feet
Construction
+ $6.00 each additional 1,000
2525 ------
square feet, or fraction thereof
2525--- 2525 2525 2525 - 2525 - 2525
Recreational Vehicle Parking
7 Day Permit, renewable once
$10.00
Permit
per 12 months
H __
Home Occupation I Permit
2525- 2525- 2525-
2525 2525-- - 2525
No charge
----
Home Occupation H Permit
Consulting fees and
$350.00
administrative escrow
Right -of -Way Permit
Per Excavation
$150.00
Erosion Control Fees - Less than
Staff costs for conducting the
_
$150.00
one acre
inspections
2525-- 2525 - 2525- 2525--- 2525
Erosion Control Fees -One toi
�---
Staff costs for conducting the
$450.00
five acres
__ __ 2525---
I inspections
2525- 2525- 2525 - -
2525 2525- 2525-- __ 2525-2525----
Erosion Control Fees - Six or
Staff costs for conducting the
$700.00
more acres
ins ections
P
-----.._ ---2525 2525---
Grading Fee 50 cubic yards or
- 2525 2525--
Staff costs for reviewing grading
- -- - - -
No charge
less
1 plans and conducting inspections
Grading Fee - 51 to 100 cubic
Staff costs for reviewing grading
: $30.00
_yards_- -
plans and conducting inspections
Page 4 of 8
Grading Fee - 101 to 1,000 cubic
Grading Fee - 1,001 to 10,000
cubic yards
Grading Fee -10,001 or more
cubic yards
Appeal of Administrative
Zoning, Sign, or Subdivision
Decisions
Water Permits - Service
Installation
Water Permits - Interior
Plumbing, New Home
Water Permits -Inter or
Plumbing, Existing Home
Water Connection Fee, New
Water Turn On/Off, Temporary
Water Permanent Disconnect
Curb Box and Service Lead, 1"
Service Connection on
Unsurfaced Street
Restoration of Typical Road Mix
Street
Restoration of Higher -Type
Street
Larger than 1" Service
Connection
Water Permits - Plan Check Fee
6 N.1 1 VI IILLW -1\V LIIJkIVVLlVII
Water Permits - State Surcharl
Water Meter/Spacer Charges -
Customer Requested Water
Meter Accuracy Test
Water Meter/Spacer Charges -
3/4" x 7 1/2" Meter
Water Meter/Spacer Charges -
3/4" x 9" Meter
Water Meter/Spacer Charges -
1" Meter
Staff costs for reviewing grading
plans and conducting inspections
Staff costs for reviewing grading
plans and conducting inspections
Staff costs for reviewing grading
plans and conducting inspections
Cost of staff time to prepare
appeal information
Fee includes removal of meter,
bench test at maintenance
facility, and returning meter to
residence; Fee will not be applied
if the meter is found to be
inaccurate to a degree exceeding
three percent (3%) from the
result of the bench test
$50.00
$75.00
$75.00 for first 10,000 cubic
yards + $30.00 each additional
10,000 cubic yards, or faction
thereof+ additional plan review
fee of $50/hour (min. charge of
1/2 hour)
$75.00
$35.00
$35.00
$10.00
_$80.00
$30.0_0
$200.0_0
$150.00
$60.00
Set by Engineer
Set by Inspector
Set by Inspector
$35.0_0
-------- - $0.50
$125.00
$370.00
$395.00
$420.00
Page 5 of 8
Water Meter/Spacer Charges - 1
$680.00
1/2" Meter
Water Meter/Spacer Charges -
$840.00
2" Meter
Water Meter/Spacer Charges
Contact Public Works for quote
Larger than 2"
Sewer - New Connections
--... -----------------
-�-- --- --------------------
$300.00
Sewer Permits -
$35.00
Altemations/Repairs
Sewer Permits - Plan Review
Set by Inspector
Fee
Sewer Permits - Reinspection
--
$35.00 hour
-
Sewer Access Charge
--- - -- -_
Set by MetCouncil Annually
.-_. -- --- --
$1,825.00 (for 2008)
Sewer Permits, State Surcharge
$0.50
Storm Utility Prohibited Sump
---------------
- ----------------
$100.00/month
Pum Connection Surcharge
Idt .11Lscellau4ustefail Acfiuifies
_
Boutique/GarageySale
Application/notification of City
i No charge
Hall required
Casual Roadside Stands
Application/notification of City
No charge
Hall required
Tent Permit
$50.00
Sidewalk Sales — ---
- - - - -- ---- --
--- --$50.00 _ -- -
Business Licensing
Includes arcade, dance hall
$100.00
Amusement Facilities
movie theater, pool/billiard
tables, bowling alleys, indoor
tennis, skating facility, outdoor
tennis, driving ranges, etc.
Business Licensing Wholesale
Liability insurance required
$200.00
Bulk Fuel Storage
Business Licensing -
$6.00/room
Hotel/Motel
Business Licensing Courtesy
$25.00
Bench, Non -advertising
Business Licensing Courtesy
$75.00
Bench, Advertising
Business Licensing -
Includes musical devices,
$15.00/location +
MechanicaUElectronic Devices
amusement rides, bowling alleys,
$15.00/machine
etc.
Page 6 of 8
Business Licensing - Retail Sales
Includes antique shops, $50.00
$200.00
beauty/barber shops, boat
As part of existing business
dealers, Christmas tree sales, dry
Fireworks Sales
------------------- -
cleaning, laundry, bakery, candy,
$350.00
meats, wholesale foods, caterers,
_.._. - —
Annual Fee, Includes
motor vehicle sales, optometrist,
_
mortuary, video sales/rentals,
over-the-counter tobacco sales,
Annual Fee, Includes
vending machines (excluding
_
tobacco), & other retail goods not
_
listed
Business Licensing -
$20.00/per 1,000 square feet, or
Restaurants, Cafes, Coffee
fraction thereof
Houses, etc.
- -- --- ----- -
Business Licensing -
$300.00
- Service
Stations
Business Licensine -
Recycling Bin
Charitable Gambling Permit -
Per Minnesota State Statute,
One bin per resident provided
free of charee
$100.00
$20.00/per 1,000 square feet, or
fraction thereof
$5.85/each
$150.00
Tobacco Sales License
Includes investigation fee
$200.00
Fi Sales
As part of existing business
$100.00
Fireworks Sales
------------------- -
Exclusive Business
----------
$350.00
Massage Therapist
_.._. - —
Annual Fee, Includes
-, -- —50.00 - -
$50.00
_
investigation fee
Massage Therapist Establishment
Annual Fee, Includes
$150.00
_
investigation fee
_
Solicitors, Peddlers, Transient
Please reference Section 350 of
J $150.00 background
Permit - For -Profit Organizations
the Municipal Code for more
I investigation + $100.00/month
- -- --- ----- -
information
- - — ..-----..-.. -- --
permit fee
. .fee - — -
Solicitors, Peddlers Transient
Please reference Section 350 of
No charge
Permit - Non -Profit
the Municipal Code for more
Organizations
information
Permanent Signs, Annual
Renewal
Per Sign
Per Sign 100 square feet or less
(maximum allowable size)
First Offense
Second Offense
Third Offense
$20.00
Rubbish Hauler Annual $150.00
Page 7 of 8
Recycling Hauler
Contractor License
Staff Research
Penalties for Late Payment
Tobacco Sales, Illegal
Tobacco Sales, Illegal
- - -ac— --
Tobacco-- Sa—l-es-, Illegal----
Candidate Filing Fee
Insufficient Funds/Returned
Check Fee
fid. y'Fa1seAlar�n�`ee� :_
False Alarm
False Alarm
False Alarm
�iI ,:Lnvesh_gatro�t-Fees -, -
Tobacco, Liquor, Charitable
Gambling, & Solicitor's Permits
Annual
Failure to pay any penalty
imposed shall be grounds for the
suspension or termination of any
license issued by the City
First Offense
Third Offense
$150.00
$30.00
$50.00/half hour
10% of license fee or $30.00,
whichever is greater
$100.00 + warning
Suspension of license for
remainder of calendar year
Revocation of license for one
$30.00
First Three Alarms No charge + letter
Four through Fifteen Alarms $50.00/alarm
Over Fifteen Alarms $150.00/alarm
150.00
Page 8 of 8
1245 West Highway 96
Arden Hills, Minnesota 55112
Phone 651.792.7800 * Fax 651.634.5137
www.ci.arden-hills.mn.us
Homeowners
Complete an application form (available at your City Hall). Be
sure to add in the State Surcharge of $0.50
There is a $2 per circuit charge for replacing circuits that are
disconnected in the old service panel and reconnected in the
new panel in the same location.
Exhibit A
Contractors
Complete a State application form. Include your complete
address including zip code. Be sure to add in the State
Circuits and Feeders
The inspection fee for the installation, addition, alteration, or
repair of each circuit, feeder, feeder tap, or set of transformer
0 to 300 amp
$50
0 to 30 amp
$8
400 amp
$58
31 to 100 amp
$10
500 amp
$72
101 to 200 amp
$15
....._------....--
600 amp
$86
_ --------- .._
300 amp
$20
800 amp
$114
400 amp
$25
1000 amp
—---
$192
------
500 amp
--___._ . ------ —'-------
$30
1100 amp
$156
600 amp
$35
1200 amp $170 700 amp $40
Add $14 for each additional 100 amps. Add $5 for each additional 100 amps
Minimum Fee: Minimum permit fee is $35 plus $0.50 state surcharge. This is for one inspection only.
Minimum fee for rough -in inspection and final is $70 plus $0.50 state surcharge.
Maximum Fee:
Apartment
Swimming Pools:
Traffic Signals:
Street Lighting:
Transformers/Generators:
Retro Fit Lighting:
Sign Transformer:
Remote Control/Signal Circuits:
Reinspection Fee:
Maximum fee for single family dwelling not over 200 amps is $150 plus $0.50 state surcharge.
Maximum of 2 rough -ins and one final inspection.
Maximum fee per unit of an apartment or condominium complex is $70. This does not cover
service and house wiring. A separate permit must be issued for house wiring.
$35 per inspection + circuits
$4 per each standard
$3 per each standard
$8/unit + $0.40 for each KVA up to 100 KVA + $0.30 for each KVA above 100 KVA
$0.40 per fixture
$8
$0.75 per device
$35
** The fee is doubled if the work starts before the permit is issued. **