~HrLLS
City of Al"den Hills
Request fOI" Council Action
Prepared by: OS
Dept.: CD
Council Mtg. Date: 1/14/2008
Final Action Needed By:
1/14/2008
Agenda Item ~i,:~'f
City Hall Repairs
Budgeted Amount: $0.00
Actual Amount: $22,000.00
Funding Source: EQuipment. Buildin!l. & Replacement Fund
Council Action Request:
Consideration authorization to have WJE prepare a project manual and obtain estimates for City Hall
repairs for a total cost of $22.000.
Staff Recommendation:
Approve the authorize to have WJE prepare a project manual and obtain estimates for City Hall repairs.
Advisory Commission Action:
Commission
Date
Action
Supporting Documents (which are attached to this Action Form):
~ Memo/Letter:
Letter dated 12/19/2007 from WJE
o Resolution (No. )
o Ordinance (No. )
o Engineering Recommendation:
o Attorney Recommendation:
o Other:
Financial Implications:
The City received funds from mediation which have been allocated to the repair of City Hall.
Administrator/Staff Comments:
None
Page 1 of 1
~
~
~.
EN HILLS
MEMORANDUM
DATE:
January 14, 2007
TO:
Mayor and City Council
FROM:
Dave Scherbel, Building Official
SUBJECT:
City Hall Repairs
Background
At the August 20, 2007, worksession, staff and Brian Pashina from Wiss, Janey, Elstner, Inc.
(WJE) were present to discuss future possible repair work to the Arden Hills City Hall Building.
At the meeting, WJE identified four areas of concern. Below are those options presented to
Council.
City Hall Repair Options:
1. Replace through-wall flashing at both levels at base of wall and install sheet metal
cap at concrete masonry foundation ledge (along south and east foundation walls.)
2. Replace through-wall flashing above windows on south side of building.
3. Clean and paint relieving angles, and replace through-wall flashing.
4. A) Increase maintenance through routine inspection of coping stones and joints,
replacement of failed sealant, and resetting coping stones as required which become
damaged by movement.
B) Remove and replace existing coping stones with proper overhang with drip and
through-wall flashing.
At that worksession, Council's recommendation was to defer Items 1 and 2, obtain bids for Item
3, and quotes for Item 4.
In preparation for going out to bid, staff has received a proposal from WJE to prepare a project
manual and bid documents for item 3 above. Attached is a copy of that proposal.
Recommendation
City staff requests authorization to have WJE prepare a project manual for cleaning, painting,
and replacement of the through-wall flashing at the relieving angles. Staff also requests
authorization to have WJE prepare coping repair details and obtain estimates for item A and B
above. Total cost for the above is $22,000.
\\Metro-inet.us\ardenhills\Building\Memos\City ball future repairs.DOC
WJE
ENGINEERS
AI1.CHITECTS
MATERiAlS SC1ENT1$TS
Wiss, Janney, Elstner Associates, Inc.
600 Highway 169 South, Suite 1520
Minneapolis, Minnesota 55426
952.545.0295 tell 952.544.6954 fax
www.wje.com
Via Email and US Mail
19 December 2007
Mr. Dave Scherbel
Building Official
City of Arden Hills
1245 West Highway 96
Arden Hills, Minnesota 55112-5743
Re: Exterior Facade Repairs
WJE No. 2005.5144.5
Dear Mr. Scherbel:
Wiss, Janney, Elstner Associates, Inc. (WJE) is pleased to provide you with this proposal for providing
architectural and engineering related services for a limited scope of exterior repairs to address the
observed water leakage at the Arden Hills City Hall building in Arden Hills, Minnesota. TIns proposal is
a follow-up to the City Council work session attended by WJE in September 2007 and our recent
telephone conversations.
SCOPE OF SERVICES
This proposal addresses the following tasks:
l. Preparation of construction documents and obtain contractor bids for installing new through. wall
flashing along relieving angles (WJE Work Session Item 3).
a. WJE will prepare a Project Manual for the required repair work. The Project Manual will contain
bidding and contracting requirenlents, technical specifications, and drawings. Division 0 -
Bidding and Contract Requirements of the Project Manual was previously reviewed by the City
of Arden Hills (City) for the chimney repair project that was completed in 2007. We assume the
same standard AlA contracts and bidding requirements will be used and that the construction will
be competitively bid following the City's requirements.
b. During the bidding process, we will:
(l) Attend a pre-bid meeting to answer any questions the bidding contractors may have.
(2) Prepare addenda as required to answer questions generated during the pre-bid meeting or
bidding process. The addenda will be used both for clarifications and for any changes that
arise from these questions. The addenda become part of the contract documents.
(3) Provide a tabulated sumnlary of the bids and assist the City in selecting a contractor.
c. Our design will be based upon our field measurements, conditions that have been exposed to date
and the original design drawings. Until demolition is underway however, we will not know how
well the as.built construction matches the original design drawings. It is likely that some
unforeseen conditions will be encountered once the repair work starts that will necessitate
Headquarters & Laboratories-Northbrook, Illinois
Atlanta I Austin l805ton I Chicago I Cleveland I Dallas I Denver I Detroit I Honolulu I Houston
Los Angeles I Minneapolis I New Haven I New York I Princeton I San Francisco I Seattle I Washington, DC
WJE
ENGiNEERS
ARCHITECTS
MATERIALS SCil:N1TSTS
Mr. Dave Scherbel
City of Arden Hills
19 December 2007
Page 2
additional inspection and office time to develop appropriate repair details for construction. This
additional design time is not included in our estimated budget for this phase of our work.
2. Prepare schematic details and obtain an estimated cost for maintenance related repairs at coping
stones (WJE Work Session Item 4A). This task would consist of inspecting the stone coping,
identifying maintenance repairs, and preparing details for preliminary pricing by one or two local
masonry repair contractors. The repair work would likely include the following:
a. Replacing failed coping sealant joints
b. Resetting displaced coping stones
c. Replacing damaged coping stones
3. Prepare schematic details and obtain an estimated cost for removing and replacing coping stones with
proper overhang with drip and through-wall flashing (WJE Work Session Item 4B). This task would
consist of preparing details for preliminary pricing by one or two local masonry repair contractors.
The objective of Tasks 2 and 3 would provide the City with estimated costs for budgeting purposes only.
These tasks do not include preparing detailed construction documents or obtaining bids from contractors.
ADDITIONAL SERVICES
During the construction phase, we will: (I) attend a pre-construction meeting; (2) perform periodic site
inspections during the repair process and prepare field reports; (3) perform an inspection at substantial
completion to judge if the work we are able to observe at the time of our periodic inspection visits and at
the time of our substantial completion inspection are in general conformance with the drawings and
specifications; (4) review snbmittals; (5) respond to contractor qnestions; (6) administer changes in the
work; and (7) review payment applications.
The length and frequency of the site inspections to be performed by WJE has yet to be determined and
will be a function of the contractor selected and the project schedule.
BUDGET
WJE proposes to perform the above noted work for the following estimated fees
Table 1. Fee estimate
Task Description Lump sum fee
1 Prepare flashing repair bid documents and assist with bidding $15,000
2 Prepare coping repair details and obtain repair estimates $3,500
3 Prepare coping replacement details and obtain repair estimates $3,500
Total: $22,000
The work will be performed in accordance with our Standard Terms and Conditions dated 8 October
2007.
WJE
ENGINEERS
ARCHITECTS
MATERIALS SCIENTlsrS
Mr. Dave Scherbel
City of Arden Hills
19 December 2007
Page 3
If you have any questions, please do not hesitate to contact us.
AGREEMENT
If you concur with this proposal, please sign in the space provided and return one copy as authorization to
proceed. Thank you for the opportunity to submit this proposal.
Very truly yours,
WISS, JANNEY, ELSTNER ASSOCIATES, INC.
, 1(,
I' ,
V''-> .
Digital signature
Everett V erSchave
Project Associate
Digital signature
Brian J. Pashina, P.E.
Principal
Enclosure:
WJE Standard Ten11S and Conditions (2 pages)
proposal 12 19 2007.doc
WJE
ACCEPTANCE
ENGINEERS
ARCHITECTS
MA'J'EIUAlS SCIENTISTS
Mr. Dave Scherbel
City of Arden Hills
19 December 2007
Page 4
Tasks Accepted: _ 1_ 2 _ 3 (check all that apply)
Accepted hy:
By:
Title:
Signature:
Date: