HomeMy WebLinkAboutItem 7A, Ice Rink Review and Warming House Moving
Request for Council Action
.
".""._-"."".".""."...".".".""...".".""..."........".."."""""""""""""""_.""""
Prepared By:
Michelle Olson, Parks and Recreation
Manager
Council Meeting Date: May 27, 2008
1. 2007/2008 Ice Rink Season Review
2. Motion to authorize staff to proceed with the project to move the old
Cummings Park warming house building to Hazelnut Park.
Budgeted Amount: Actual Amount: Funding Source:
$14,000.00 Estimated - $13,365.00 Special Revenue - Park Fund
Recommendation:
A motion to authorize staff to proceed with the project to move the old Cummings Park warming house
building to Hazelnut Park.
Supporting Documents:
1. Memorandum dated May 27,2008 from Michelle Olson, Parks and Recreation Manager.
2. Attendance Spreadsheet from 2007/2008 Ice Rink Season.
~
~
EN HILLS
MEMORANDUM
DATE: May 27, 2008
TO: Honorable Mayor and City Council
Ron Moorse, City Administrator
FROM: Michelle Olson, Parks and Recreation Manager -rrtf9
SUBJECT: Ice Rink Warming House Review and Hazelnut Park Building Replacement
BACKGROUND
As part of the Warming House Replacement Plan, approved in July of 2006, staff was to present
an end of the year evaluation of each rink season for City Council review. The season officiaIIy
ended on February 24, 2008. Overall attendance for all rinks increased from 2,876 users in
200612007 to 4,320 in 200712008. I have attached the attendance spreadsheet for your
information. The. weather this past winter produced excellent ice conditions. The rinks were
open more regularly than any other season in the last nine years. Staff has listed each of the five
sites below, indicating building condition, attendance, further maintenance needed for 2008/2009
season, and any other notable situations.
Hazelnut Park
Building Condition - The building was built in 1960. Before the 200612007 season
started, the building was in need of repairs to the ceiling, roof and outside siding. The
building was repaired and is in ok condition. However, since the building is not built
on a concrete slab, critter holes appear each spring and do cause issues. The building is
not insulated and therefore does not hold heat efficiently.
Attendance - This rink continues to experience high attendance. Attendance
increased from 905 in 2006/2007 to 1,398 in 2007/2008. The building was open 58 days
(333 hours) versus 37 in 200612007. The average daily use was 24.1. This is essentially
the same usage as 200612007 when it was at 24.45.
Further maintenance or issues to be addressed before 2007/2008 - The City Council
directed staff at the July, 2007 work session to budget for the move ofthe old warming
house at Cummings Park to Hazelnut Park in 2008. The old Cummings Park warming
house building is currently utilized for storage. It has had numerous graffiti, break in,
\ \Metro-inet. us\ardenhills\PR&PW\Parks\Memos\Council Memos\warming house Review
08.DOC
Page 2 of 5
and vandalism issues and is located in a remote, dark area of the park. Staff did budget
$14,000 for this project. Staff did receive two quotes for the move of the building,
electrical, and concrete work. The following is a breakdown ofthe low quoted costs to
move the building from Cummings Park to Hazelnut Park:
Building Tear Down -Approximately $500 for a roll off dumpster
Concrete Slab - Approximately $4,465.00
Electrical Reconnect - Approximately $2,850.00
Movement of the building - Approximately $4,600
New Roof - Approximately $800
Exterior Paint - Approximately $150
Estimate Grand Total for move - $13,365.00
The Public Works Department is planning to do the tear down of the building, site
grading, and concrete slab preparation. In addition, there is one pine tree in poor
condition along the tennis courts that may need to be trimmed significantly or removed in
order to facilitate the move of the building. This tree is in poor condition and currently is
growing into the fencing of the tennis court, adding stress to the fence and causing
surface issues in that area.
This site experienced electrical issues with one of the light poles late in the ice rink
season. This problem should be able to be addressed during the electrical reconnect of
the new building.
CUmmilll!S Park
Building Condition -The pavilion is utilized year round for rentals and programming
and is in excellent shape.
Attendance - Attendance increased from 283 users in 2006/2007 to 365 in 2007/2008.
This increase was largely due to the building being open 50 days (283 hours) versus 30 in
2006/2007. The average daily use was 7.3. This is down from an average daily use in
2006/2007 of 9.4
Assessments - Rinks with a hockey rink are definitely more popular due to the multiple
users. However, when the hockey rink was removed after the construction of the
building, the City Council decided against constructing a replacement hockey rink.
Further maintenance needed before 2008/2009: None known at this time.
Freewav Park
Building Condition - The building which was moved from Valentine Park to this location
is much larger than the old building and works better for this busier rink. We have had
no issues with pest infestation and the building and concrete slab appear to be in good
shape.
\\Metro-inet.us\ardenhills\PR&PW\Parks\Memos\Council Memos\warming house Review
08.DOC
Page 3 of 5
Attendance - Freeway Park was our top attended rink this season. Attendance increased
from 857 users in 2006/2007 to 1,414 in 2007/2008. The building was open 57 days
(334.5 hours) versus 37 in 2006/2007. The average daily use was 24.8. This is slightly
up from the 2006/2007 season when it was 23.16.
Further maintenance or issues to be addressed before 2008/2009 Season - Access to the
building from the parking lot continues to be a safety hazard. This has always been a
chaIIenge for this site. It is a priority for staff to set this up before the season begins in
order to keep the flooding process from limiting access to the warming house. Staff
met out at the site and has a plan for next season and beyond to ensure that the City
provides a safe path from the parking lot to the building. In addition, on our last day of
the season, the electricity for this site had technical issues. The Public Works
Department is hoping to fix this internally. If not, an electrician will need to be called to
take a look at it.
Perry Park
Building Condition: The roof at Perry Park was replaced in 2006 and the building is in
very good shape.
Attendance - Attendance increased from 573 in 2006/2007 to 884 in 2007/2008. The
building was open 50 days (283 hours) versus 30 days in 2006/2007. The average daily
use was 17.68. This is down from 2006/2007 when it was at 19.1.
Further maintenance needed before 2007/2008: None known at this time.
Assessments - This site does have access issues due to the location ofthe building and the
road. Currently, skaters must cross the road in order to get to the ice rink. If this site
continues as an ice rink, the City Council may at some point want to consider relocating
the road to the other side of the building. This would allow for a pleasure rink and
would provide safe access to the rink and to the warming house. No estimate on cost has
been done for this potential project. The City does place stop signs at this crossing
location as an added safety measure.
Valentine Park
Attendance - The attendance at this rink increased from 244 in 2006/2007 to 259 in
2007/2008. The building was open 49 days versus 37 days in 2006/2007. The average
daily use was 5.28. This is down from an average daily use of 6.59 from 2006/2007.
Park Condition - The main reason that the City Council moved the permanent structure at
Valentine Park to Freeway Park was due to the annual flooding that occurs. The City
Council asked staff to evaluate the cost of fixing the drainage issue at that park. Kris
Giga, Civil Engineer prepared a preliminary estimate of $220,000 on May 3, 2006.
\\Metro-inet.us\ardenhiIIs\PR&PW\Parks\Memos\Council Memos\warming house Review
08.DOC
Page 4 of5
However, it was recommended at that time that a study of the entire drainage area be
considered in order to get a comprehensive understanding of the park and surrounding
neighborhoods. A drainage study of the area would model the existing conditions to
identify the extent of flooding in problem areas during various rain events. The study
would also include an analysis of modifications and/or improvements needed to the
existing system to correct drainage problems. Results of the study will assist staff in
determining the most cost effective way to incorporate recommended drainage
improvements into nearby PMP projects.
Staff did budget $20,000 for this stand alone study in 2008. Staff is planning to go
out for Requests for Proposals from the engineering pool for this project sometime in
August.
Assessments - This year, Mini Mobile who had provided our mobile warming house in
200512006, calIed one week before the season was to begin to inform us that they did not
have a unit for us. Therefore, staff was forced to contract with SateIIite for a different
office at a total cost of $2,066.32. The stair unit on the building did sustain damage over
a weekend during the season and the cost to fix it was $400.20. Therefore, without the
damages, the total rental fee was: $1,666.12. This amount was over budget by $366.12
due to the change in companies. Although this mobile unit was sufficient, it did have
stairs which are not ideal for an ice rink building. The access to the rink is not an ideal
situation at this rink. This wilI need to be addressed before the flooding begins next
season.
RINK MAINTENANCE
The rink maintenance procedures were reevaluated and restructured with very positive results in
2006/2007. These procedures remained the same this past season:
Preseason - The flooding schedule was scheduled as a shift change versus paid overtime.
Overnight flooding took place for the preseason with a two person crew.
Regular season - Flooding crews were occasionaIIy scheduled to start 2-3 hours before
normal shift hours. This results in better flooding conditions and better ice conditions.
The consistent cold weather this past winter made the ice conditions ideal throughout the entire
season. Our Public Works Department did a fabulous job of maintaining the rinks and should be
commended.
RECOMMENDATION FOR 2007/2008 SEASON
Outdoor rink usage has gone down in the last five years. At some point, the City Council may
want to consider reducing the number of rink sites.
\\Metro-inet.us\ardenhills\PR&PW\Parks\Memos\Council Memos\warming house Review
08.DOC
Page 5 of5
Staff recommends a motion to authorize staff to proceed with the project to move the old
Cummings Park warming house building to Hazelnut Park.
BUDGET
Staff budgeted $14,000 in 2008 from the Special Revenue - Park Fund for this project.
REQUESTED ACTION
A motion to authorize staff to proceed with the project to move the old Cummings Park warming
house building to Hazelnut Park.
\\Metro-inet.us\ardenhiIIs\PR&PW\Parks\Memos\Council Memos\warming house Review
08.DOC
2007/2008 ICE RINK USER TOTALS
GENERAL HOCKEY TOTALS PER
PARK DATES Hours SKATERS SKATERS BROOM-BALL LESSONS PARK
Cum minas 12/17-2/18 283 141 69 0 155 365
F reewav 12/17-2/24 334.50 211 873 328 2 1,414
Hazelnut 12/17-2/24 333 224 1,111 63 0 1,398
Perrv 12/17-2/21 299 83 677 89 35 884
Valentine 12/17-2/18 280.50 218 41 0 0 259
Subtotal 1,530 877 2,771 480 192 4,320
General 877
Hockey 2,771
Broomball 480
Lessons 192
TOTAL 4,320
2005/2006 Total Days Open
Cummings 32
Freeway 30
Hazelnut 30
Perry 32
Valentine 29
2006/2007 Total Days Open
Cummings 30
Freeway 37
Hazelnut 37
Perry 33
Valentine 37
Number of
Users
2,635
Number of
Users
2,876
2007/2008 Total Days Open
Cummings 50
Freeway 57
Hazelnut 58
Perry 55
Valentine 49
Number of
Users 4.320