Request for Council Action
~
Prepared By: Dave Scherbel
Council Meeting Date: June 30, 2008
Motion to Approve the June 4, 2008, Quote from Pearson Mechanical to Install a
Cooling System in the Audio Visual Room for an Amount Not to Exceed $9,970.00
Budgeted Amount:
$0
Actual Amount:
$9,970.00
Funding Source:
Cable Fund-Capital Outlay,
other equip.
Recommendation:
Motion to approve the June 4, 2008, Quote from Pearson Mechanical to Install a Cooling System
in the Audio Visual room for an Amount Not to Exceed $9,970.00.
Supporting Documents:
1. Memo to the City Council dated June 10, 2008
2. Pearson Mechanical proposal
3. Johnson Control proposal
~
EN HILLS
MEl\tIORANDUM
DATE:
June 30, 2008
TO:
Mayor and City Council
Ron Moorse, City Administrator
FROM:
Michelle Olson, Parks and Recreation Manager
Greg Hoag, Public Works Director
Dave Scherbel, Building Official
SUBJECT:
City Hall Building Systems
Requested Action
Motion to approve the June 4, 2008, Quote from Pearson Mechanical to Install a Cooling System
in the Audio Visual room for an Amount Not to Exceed $9,970.00.
Back{!round
The original design of the Audio Visual (A V) room's ventilation did not take into account the
large amount of heat generated from the equipment in that room. The cooling system is
inadequate for that large amount of heat being generated, which contributed to the failure of the
equipment in that space.
To help prolong the life of the current equipment and comfort level for the occupants, staff
obtained proposals from two Inechanical contractors. The contractors were requested to evaluate
the space and come up with the most economical solution to cool the A V room. Both contractors
suggested installing a split unit cooling system. The contractor would install an air conditioning
unit in the room and the condensing unit on the roof.
Quotes
Staff received two quotes for this project, \vhich are attached:
o Johnson Controls for $ 13,438.00
o Pearson Mechanical for $9.,970.00.
C:\DoCUlnents and Settings\noah.sirTIon\Local SettingsTelnporary Inlelllet Files'OLK6C\City Hall A V room cooling (2).DOC
Bud2et
Funding for the cooling system would come from the Cable Fund. This was not a budgeted item
for 2008; however, there is a sufficient balance in the Cable Fund to cover the cost of this
improvement.-capital outlay, other equipment.
Recommendation
Staff recommends approval of the June 4, 2008, quote from Pearson Mechanical to install a
cooling system in the Audio Visual room for an amount not to exceed $9,970.00.
Attachments
June 4, 2008 Quote from Pearson Mechanical
May 23, 2008, Quote from Johnson Control
C:\Documents and Settings\noah.simon\Local Settings\Temporary Internet Files\OLK6C\City Hall A V room cooling. DOC
-.:.
:i
t
'J,
::
":.i
'.
.1
J
~~
~
r
PROPOSAL 08-398
Mechanical Contractors
13491 Fenway Blvd Cit. N . Suite 100 . Hugo# IVJN +55038 .Pllone (~1) 275.1100 +Fax (651) 275..1107
COInpany ~ Phon. I ):!iQl; ,~
City of Arden Hills 6/4J08
Street Addreaa Project N~
Cooling of AV Rooms
City. St4ttG ~ Zip Pc'(Jj~ "'oc:atlCJIJ
Attantlon: Project Da8CtJption
DAVE SCHERBEL
~
Below is pricing to furnish and install one 1...1/2 ton mini-split system as per our c;onversation" This price is based on
access for electrlcal and condensate drains without cutting and patohing any sheetrock nr plaster.
To include;
., Outdoor condenser
.. Line 56t
. Indoor unit
. Eiectrjcal
. Roofing
. Labor
Thank you for considering Pearson Mechanical for this project.
WE PROPOSE hereby to furnish material and labor - com plete in accordance with above specifications, for the sum of: l
Cost~ Nine Thousand Nine Hundred Seventy Dollars
$91970.00
All material is: guaranteed to be as speoified. All work to be complet$d In a wotkmanJike manner according to standard prac:dc&s. Pear6cn
Meohanicat Services. Inc. accepts the respon&lbJlity for installation of the mechanical system only .a$ It t$Iates to the bid scope as detsileo In the
bIdding documents. We exclude engineering liability for the design or code compliance of the exjsting mechanical system. Any alteraUon or deviation
from above specifications Invotvlng extra costs \ViII beoom e an extra charge over and above th6 $$tJmate. Pearson Mechanical SetVioes, Inc. wlU not
be h~d HC1bJe for agreements contingent upon strlka, accIdents or delayS beyond our control. Building owner to carry fire. property and other
necessary Insurance. Outwotkers are covered by workmen's compensation insurance. Pearson Mechan~al Services, Inc. wDI not be responsible for.
tlor will bid on thia project any work or cost of asbestos abatem$nl EU.dldfng owner to prgvide safe work area wIth free access to carry out above
work. All work to be pelforml8d during nonn.al workday on straight time unless otherwise noted. 1 % % charged on aU a~ounts over 30 days, As part
Q~fiS P ai, if it 1$ J1Iqulred by the Contfa earson Mechanical will provide cl)Mmel'eiaf ger'letl\1 liability insuranoe to the fuUest extent of Its
cu nau nCG coverlig,. Pearson Mech I J YJiJI not any Insut'ance obU9~tion$ beyond that incJuded in its currant Insurance policy.
(
~ Nota: Propot;al may be withdrawn by us if not accepted withl(J So days.
Denny Seidl- Estimator. ~rrone !651) 275-1100 Fax (651) 275-1107
AcCEPTANCE OF P~OPOSAL - The above pricss1 specffioatians and conditions are satisfactory and hereby a~Pted. You are authorized to do
the wotk as tJpecifled. Payment wUI be made a5.outlined above.
Date of Acceptance
Authorized Signature
Johnson fj(,
Controls
. , -PROPOSAl: .......
288.. Minneapolis Service Branch
2605 Fembrook lane N
h .1..... .... .. ...........-..........".0... .. . ... ..... '.0..0 "0 . '.0 .... ....... ............ .... . _.,.~
. .... -...-.....-..-.-...................... ........ ......... ..-.........-,.. - ...-............ '0'_, .,....... . .,... .. . '0_ .... ..0. _.. .. ..... ....__... _____
Plymouth; MN 55447
Phone: '763-566-7650
Fax: 763-585-5169
Date: May 23, 2008
Project: City of Arden Hills
AudioNisual Room
TO: City of Arden Hills
AUn: Dave Scherbei
We propose to furnish the materials and/or perform the work described b~low for the net price of: $13,438.00
Thirteen-Thousand Four-Hundred and Thirty-Eight Dollars and no/cents
For the above price this proposal includes:
Currentfy there are issues With the AudioMsual equipment room located at the City Hall. Due to the heat load in the space we
are proposing to install a Sanyo mini split air conditioning unit
Scope of:work:
1. Provide Sanyo 36,000 Btu KHS3072 + C3072r low ambient split system. This is an inverter type compressor which will vary as
the load changes4 Jet will install a unit on the waif or in the ceiling grid/plenum.
2. Provide electrical hook up.
3. Install condensing unit onto the roof.
4.. Provide roof cones and sleeper curbs.
5.. Provide condensate pump and discharge piping to nearest drain..
6. Provide compJete startup and checkout.
Alternates to the proposal are:
This proposal DOES NOT include:
Any overtime, additional work beyond original scope..
This proposal and alternates listed below are hereby accepted
and Johnson Controls is authorized to proceed with work;
subject, however to credit approval by Johnson Controls, Inc..
MilwaukeeJ Wisconsin.
This proposaJ is valid until: 07/01/2008