HomeMy WebLinkAbout7E, Erosion & Sediment Control Ordinance Update .. _mLLs Request for Council Action Prepared By: Kristine Giga, Civil Engineer Council Meeting Date: July 14, 2008 Erosion and Sediment Control Ordinance Update Budgeted Amount: N/A Actual Amount: N/A Funding Source: N/A Recommendation: 1. Approve Ordinance 2008-009 to Add Chapter 15, Erosion and Sediment Control Ordinance and its Subdivisions to the City Code as Presented in the July 14, 2008, Report to the City Council 2. Approve Publishing a Summary of Ordinance 2008-009 for the Erosion and Sediment Control Ordinance as Permitted by Minnesota State Statute 412.191 Subd. 4 (4/5 Vote Required) 3. Authorize Staff to Contract with Ramsey Conservation District for Erosion and Sediment Control Services Supporting Documents: 1. Memorandum dated July 9, 2008 from City Staff. 2. Ordinance 2008-009: Erosion and Sediment Control Ordinance. 3. Summary of Ordinance 2008-09: Erosion and Sediment Control Ordinance. 4. Proposal Letter dated June 18, 2008, from the Ramsey Conservation District. ~ MEMORANDUM DATE: July 9, 2008 TO: Mayor and City Council Ron Moorse, City Administrator FROM: Kristine Giga, Civil Engineer James Lehnhoff, City Planner SUBJECT: Erosion and Sediment Control Ordinance and Enforcement BACKGROUND Ordinance #328, Erosion and Sediment Control, was adopted on July 9, 2001. Since that time, regulations have changed and evolved. As part of the City of Arden Hills' Municipal Separate Storm Sewer System (MS4)/ Storm Water Pollution Prevention Plan (SWPPP) permit, revisions to the Erosion and Sediment Control ordinance are required. Updates to the ordinance must be in place by August 15, 2008, which is six months after the permit coverage was extended to the City by the Minnesota Pollution Control Agency (MPCA). DISCUSSION The revisions to the Erosion and Sediment Control ordinance focus on the following: · Bringing the ordinance into compliance with current standards and regulations; · Incorporating the MS4/SWPPP requirements; · Revising and clarifying the enforcement process for staff and applicants; · Enhancing the enforcement tools for the City; and, · Integrating the Ordinances into the City Code as Chapter 15. The revised ordinance is designed to be clearer, easier to find, and easier to enforce with a broader range of tools. The ordinance will allow the City to complete corrective work if the permittee fails to do so and draw on escrow or charge the permittee for all related expenses. Issuing stop work orders, withholding other inspections, and withholding Certificate of Occupancy have also been incorporated into the enforcement section. In an effort to assist the City with inspections and enforcement of this ordinance, the Ramsey Conservation District (RCD) has provided a proposal for erosion and sediment control services. \ \Metro-inet.us\ardenhills\PR&PW\Engineering\2008\CounciJ _ Actions\ 7 -14-08 _Memo _ ESC _ Ordinance.doc 7/9/2008 Page 2 The RCD has a long-standing program assisting local governments in managing soil erosion and sediment, and they have staff registered/certified in erosion and sediment control inspection. Currently, the RCD has a Joint Powers Agreement with the MPCA to inspect all construction sites greater than one acre in size in Ramsey County. The RCD has worked with most local units of government and regional water management organizations within Ramsey County, such as the Rice Creek Watershed District, to develop and implement erosion and sediment control measures to ensure that land disturbance activities have minimal impacts on our water and storm water conveyance resources. The current fee schedule includes an erosion control fee; the fee is based on the size of the proposed land disturbance. While adjustments may be needed in 2009, the current fees are anticipated to be sufficient to cover the cost of Ramsey Conservation District's rates. Staffwil] monitor the billing and adjust the fee schedule for 2009 if necessary. Similar to the Land Use Permit application, the permit form will state that all applications may be subject to additional fees for reimbursement of consultant costs associated with filing, reviewing, and processing of application in the form of an escrow to the City. Therefore, if the permit fee is not sufficient in 2008, the City will be able to recover the costs. Staff recommends contracting with the RCD for these services. The RCD staff is experienced and certified in erosion and sediment control and are conveniently located in Arden Hills at the Ramsey County Public Works Building. There would be no additional costs incurred by the City, as their services would be paid for by the permit fees charged to applicants. RECOMMENDED COUNCIL ACTION I. Approve Ordinance 2008-009 to Add Chapter 15, Erosion and Sediment Control Ordinance and its Subdivisions to the City Code as Presented in the July 14, 2008, Report to the City Council. 2. Approve Publishing a Summary of Ordinance 2008-009 for the Erosion and Sediment Control Ordinance as Permitted by Minnesota State Statute 412.191 Subd. 4. (4/5 Vote Required). 3. Authorize Staff to Contract with Ramsey Conservation District for Erosion and Sediment Control Services. If needed, modifications to the ordinance can be included with a motion for approval. A TT ACHMENTS · Ordinance 2008-009: Erosion and Sediment Control Ordinance · Summary of Ordinance 2008-009: Erosion and Sediment Control Ordinance · Ramsey Conservation District Proposal to Provide Erosion and Sediment Control Services City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance STATE OF MINNESOTA COUNTY OF RAMSEY CITY OF ARDEN HILLS ORDINANCE 2008-009 AN ORDINANCE REQUIRING EROSION AND SEDIMENT CONTROL FOR LAND DISTURBANCE ACTIVITIES WITHIN THE CITY OF ARDEN HILLS The Arden Hills City Council hereby repeals Ordinance #328 and adds Chapter 15 and its subdivisions to the Arden Hills City Code to read as follows: Chapter 15: Erosion and Sediment Control Section 1500 - Purpose and Scope 1500.01 Purpose. The purpose of this regulation is to control or eliminate soil erosion and sedimentation wi~hin the City of Arden Hills. The regulation establishes standards and specifications for conservation practices and planning activities which minimize soil erosion and sedimentation and work to protect the City's natural resources for the health, safety, and welfare of the public. 1500.02 Scope Except as exempted by the definition of the term "land disturbance activity" in Section 1510.01, any person, firm, sole proprietorship, partnership, corporation, state agency, or political subdivision thereof proposing land disturbance activity within the City shall apply to the Public Works Director or appointed designee (herein called "PWD") for the approval of the Erosion and Sediment Control Plan. No land shall be disturbed until the Plan is approved by the PWD and conforms to the standards set forth in this article. Section 1510 - Definitions 1510.01 Definitions. For the purposes of this ordinance, the following terms have the meanings given them in this section: Subd. 1 Best Management Practices (BMP). A technique or series of techniques which are proven to be effective in controlling runoff, erosion, and sedimentation. Subd. 2 Bluff. A topographic feature such as a hill, cliff, or embankl11ent having the following characteristics (an area with an average slope of less than 18 percent over a distance for 50 feet or more shall not be considered part of the bluff): A. Part or all of the topographic feature is located in a shoreland area; 1500 - 1 City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance B. The slope rises at least twenty five (25) feet above the ordinary high water level of the waterbody; C. The grade of the slope from the toe, or bottom, of the bluff to a point twenty five (25) feet or more above the ordinary high water level averages thirty percent (300/0) or greater; and D. The slope must drain toward the waterbody. Subd. 3 Certificate of Completion. Final inspection of the site has been completed, temporary erosion control has been removed and the site has been fully restored. Subd. 4 Clearing and grubbing. The cutting and removal of trees, shrubs, bushes, windfalls and other vegetation including removal of stumps, roots, and other remains in the designated areas. Subd. 5 Erosion. Any process that wears away the surface of the land by the action of water, wind, ice, gravity and/or land disturbance activities. Erosion can be accelerated by the activities of man and nature. Subd. 6 Erosion and Sediment Control Plan (Plan) is a plan which includes a set of best management practices or equivalent measures designed to control surface runoff and erosion and to retain sediment on a particular site during the period in which pre-construction and construction related land disturbances, fills, and soil storage occur, and before final improvements are completed, all in accordance with the specific requirements set forth in Section 1520. This Plan shall also include permanent measures and Best Management Practices to control post-construction surface runoff and sediment. Subd. 7 Erosion and sediment control practice specifications and erosion and sediment control practices. The management procedures, techniques, and methods to control soil erosion and sedimentation as described in, but not limited to, the following manuals: A. Minnesota Stormwater Manual B. Minnesota Pollution Control Agency's ""Protecting Water Quality in Urban Areas" handbook Subd. 8 Excavation. The mechanical removal of earth material. Subd. 9 Fill. The deposit of soil or other earth materials placed by artificiallneans. Subd.l0 General Storm Water Permit. The Minnesota Pollution Control Agency's (MPCA) general National Pollutant Discharge Elimination System (NPDES) construction storm water permit covering anyone conducting a land disturbing activity which disturbs one (1) or more acres of total land area. Subd. 11 Grading. Excavation or fill of material, including the resulting conditions thereof 1500 - 2 City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance Subd. 12 Land Disturbance Activity. Any land change that may result in soil erosion from wind, water and/or ice and the movement of sediments into or upon waters or lands of the city, including but not limited to construction, clearing and grubbing, grading, excavating, transporting and filling of land. Land Disturbance Activity does not mean the following: A. Minor land disturbance activities such as home gardens and an individual's home landscaping, repairs and maintenance work; B. Additions or modifications to existing single-family dwellings that will result in creating under 10,000 square feet of exposed soil and/or impervious surface except within a shoreland area; C. Construction, installation and maintenance of electric, telephone, and cable television utility lines or individual service connection to these utilities, except where a minimum of 10,000 square feet of land disturbance can be anticipated; D. Tilling, planting or harvesting of agricultural, horticultural, or silvicultural crops; E. Installation of fence, sign, telephone, and electric poles and other kinds of posts, bollards or poles; and F. Emergency work to protect life, limb, or property and emergency repairs. However, if the land disturbing activity would have required an approved Erosion and Sediment Control Plan except for the emergency, then the land area disturbed shall be shaped and stabilized in accordance with the requirement of the PWD when applicable. Subd. 13 Outfall. The point source where a storm sewer system discharges from a pipe, ditch, or other discrete conveyance to receiving waters, or to a storm sewer system owned and operated by another party. Subd. 14 Permittee. A person, firm, sole proprietorship, partnership, corporation, state agency or political subdivision thereof engaged in a land disturbance activity who submits an application to the PWD for a permit pursuant to this ordinance. Subd. 15 Phasing. Clearing a parcel of land in distinct phases, with the stabilization of each phase before the clearing of the next. Subd. 16 Ramsey Conservation District. The Ramsey Soil and Water Conservation District. Subd.17 Rice Creek Watershed District. An organization which oversees the activities in the Rice Creek watershed as defined by Minnesota Statutes, Sections 103B,and l03D. Subd. 18 Runoff. Rainfall, snowmelt, or irrigation water flowing over the ground surface. 1500 - 3 City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance Subd. 19 Sediment. Solid mineral or organic material that, in suspension, is being transported, or has been moved from its original site by air, water, gravity, or ice, and has been deposited at another location. Subd. 20 Sedimentation. The process or action of depositing sediment, caused by erosion. Subd. 21 Site. The entire area of land on which the land disturbance activity is proposed in the permit application. Subd. 22 Site Plan. A plan or set of plans showing the details of any land disturbance activity of a site including but not limited to the construction of: structures, open and enclosed drainage facilities, stormwater management facilities, parking lots, driveways, curbs, pavements, sidewalks, bike paths, recreational facilities, ground covers, plantings, and landscaping. Subd. 23 Shoreland. The land located within the following distances from protected waters: A. One thousand (1,000) feet from the ordinary high water mark of a lake, pond, or flowage; B. Three hundred (300) feet from a river or stream, or the landward extent of a flood plain on such rivers or streams, whichever is greater; and, c. The practical limits of shorelands may be less than the statutory limits where the limits are designated by natural drainage divides at lesser distances, as shown on the official map of the City. Subd. 24 Stabilization. The use of measures which protect soil from the erosion forces of wind, rain and flowing water. Subd. 25 Steep Slope. Land where agricultural activity or development is either not recommended or described as poorly suited due to slope steepness and the site's soil characteristics, as mapped and described in available county soil surveys or other technical reports, unless appropriate design and construction techniques and farming practices are used in accordance with the provisions of this chapter. Where specific infonnation is not available, steep slopes are lands having average slopes over twelve percent (120/0), as measured over horizontal distances of fifty (50) feet or more, that are not bluffs. Subd.26 Utility. The owner/operator of any underground facility including an underground line, facility, system, and its appurtenances used to produce, store, convey, transmit, or distribute communications, data, electricity, power, heat, gas, oil, petroleum products, water (including stormwater), steam, sewage and other similar substances. Subd. 27 Watercourse. Any natural or improved stream, river, creek, ditch, channel, canal, conduit, gutter, culvert, drain, gully, swale, or wash in which waters flow either continuously or intermittently. 1500 - 4 City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance Subd.28 Watershed. A region draining to a specific river, river system, or body of water. Subd. 29 Wetlands. A lowland area such as a marsh, that is saturated with moisture, as defined in Sec. 404, Federal Water Pollution Control Act Amendments of 1987, or the Minnesota Wetland Conservation Act of 1991. Section 1520 - Erosion and Sediment Control Plans and Review 1520.01 Erosion and Sediment Control Plan. Subd. 1 Required. An Erosion and Sediment Control Plan must be submitted to the PWD for every project involving a land disturbance activity. No building permit, site plan approval, subdivision approval, or permit to allow land disturbing activities shall be issued and no earth disturbing activity shall commence until approval of the Erosion and Sediment Control Plan. Projects coordinated by Ramsey County or MnJDOT do not require a permit; however, the PWD shall be notified of the project and be provided a copy of the Erosion and Sediment Control Plan, as well as an estimated schedule for commencement and completion. The PWD shall notify the designated contact if erosion control measures should fail or require maintenance with the expectation that the deficiencies will be corrected. If no permit has been obtained, a stop work order may be issued on the construction and a fine may be issued in an amount equal to twice the required permit fee. A completed Erosion and Sediment Control Plan and permit application shall be submitted before construction will be allowed to resume. Every Permittee must also obtain, when applicable, permits from agencies including, but not limited to, the following: A. Minnesota Pollution Control Agency (MPCA) National Pollutant Discharge Elimination System (NPDES). B. Rice Creek Watershed District. Subd. 2 Application Fee. The Permittee shall submit an applicatiol1 fee as specified on the City's Fee Schedule as adopted and revised annually by the City Council by ordinance. The fee is non-refundable and shall cover any review costs accrued within one (1) year of the date of payment. Subd. 3 Criteria. The Erosion and Sediment Control Plan shall minimize soil erosion or sediment from damaging adjacent land. A Permittee engaged in a Land Disturbance Activity shall submit an Erosion and Sediment Control Plan that will minimize soil eros-ion or sediment from damaging adjacent land, bodies of water, watercourses or wetlands to the PWD for approval. 1500 - 5 City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance The Erosion and Sediment Control Plan shall address the following criteria: A. Conform to the natural limitations presented by topography and soil so as to create the least potential for soil erosion. B. Stabilize all exposed soils and soil stockpiles; C. Establish permanent vegetation; D. Prevent sediment damage to adjacent properties and other designated areas; E. Schedule of erosion and sediment control practices; F. Use of temporary sedimentation basins; G. Stabilization of steep slopes and bluffs; H. Control the storm water leaving a site; I. Stabilize all waterways and outlets; J. Protect storm sewers and outfalls from the entrance of sediment, debris and trash; K. Control waste, such as discarded building materials, concrete truck washout, chemicals, litter and sanitary waste that may adversely impact water quality; L. When working in or crossing water bodies, take precautions to contain sediment; M. Re-stabilize utility construction areas as soon as possible; N. Protect paved roads from sediment and mud brought in from access routes; o. Dispose of temporary erosion and sediment control measures; P. Maintain all temporary and permanent erosion and sediment control practices; and, Q. Removal of sediment from streets at the end of each day Subd. 4 Plan Content. The Erosion and Sediment Control Plan content shall include the following unless waived by the PWD: A. Contact information for the Permittee; B. Address of site where the land disturbing activity is proposed; C. Signature(s) of the owner(s) of the site or an authorized representative; 1500 - 6 City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance D. Project description including the nature and purpose of the land disturbing activity and the amount of grading involved; E. Phasing of construction and timeline; F. Existing and proposed site conditions, including topography, vegetation, and drainage; G. Adjacent areas, neighboring streams, lakes, wetlands, residential areas, roads, etc., which might be affected by the land disturbing activity; H. Soil data including soil names, mapping units, erodibility; I. Critical erosion areas, which are areas on the site that have potential for serious erosion problems; J. Erosion and sediment control measures to be used on the site, both during and after the construction process; K. Temporary and Permanent stabilization to show how the site will be stabilized during and after construction (is completed), including specifications; L. Storm water management to show how storm runoff will be managed, including methods to be used if the development will result in increased peak rates or volume of runoff; M. Maintenance and schedule of regular inspections and repair of erosion and sediment control structures; and, N. Any calculations that were made for the design of such items as sediment basins, diversions, waterways, and other applicable practices. 1520.02 Review of Penn it Application Subd. 1 General. The PWD shall review the Erosion and Sediment Control Plan to ensure compliance with the erosion and sediment control practice specifications and erosion and sediment control practices. Subd. 2 Permit Approval. If the PWD determines that the Erosion and Sediment Control Plan meets the requirements of this ordinance, the PWD shall issue a permit, valid for a specified period of time that authorizes the land disturbance activity contingent on the implementation and completion of the Erosion and Sediment Control Plan. Subd. 3 Permit Denial. If the PWD determines that the Erosion and Sediment Control Plan does not meet the requirements of this article, the PWD shall not issue a permit for the land disturbance activity. The Erosion and Sediment Control Plan must be resubmitted for ] 500 - 7 City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance approval before the land disturbance activity begins. No land use and building permits shall be issued until the Permittee has an approved Erosion and Sediment Control Plan. 1520.03 Escrow Requirement. After approval of an Erosion and Sediment Control Plan, the PWD may require the Permittee to escrow a sum of money sufficient to ensure the installation, completion, maintenance, inspection, and enforcement of the Erosion and Sediment Control Plan and practices. Escrow amounts shall be set by Ordinance in the City fee schedule. Upon project completion, the remaining escrow shall be returned to the Permittee. 1520.04 Modification of Plan. An approved Erosion and Sediment Control Plan may be modified upon submission of an application for modification to the PWD and subsequent approval by the PWD. In reviewing such application, the PWD may require additional reports and data. Section 1530 - Implementation and Maintenance 1530.01 Implementation and Maintenance of Plan. All storm water pollution controls noted on the approved Erosion and Sediment Control Plan shall be installed before commencing the land disturbing activity and shall not be removed without PWD approval or approval of a Certificate of Completion. Noncompliance with the Erosion and Sediment Control Plan shall constitute grounds for an order from the PWD to halt all construction. 1530.02 Implementation. The plan implementation shall incorporate the following: Subd. 1 Existing vegetation shall be retained whenever feasible. Subd.2 Land shall be disturbed in increments of workable size such that adequate erosion and sediment control can be provided and maintained as construction progresses. The area exposed shall be stabilized in conformance with best management practices and with the maintenance requirements in the NPDES General Construction Permit. Soil stabilization measures should be selected to be appropriate for the time of year, site conditions, and estimated duration of use. Subd. 3 The location of areas not to be disturbed shall be identified with flags, stakes, signs, silt fence, etc. before construction begins. Subd. 4 Down-gradient sediment controls shall be in place before up-gradient land disturbing activity begins. Subd. 5 All storm drains, inlets and outfalls shall be protected until all sources of potential discharge are stabilized. Subd. 6 Temporary stockpiles shall have effective sediment control and can not be placed in surface waters or storm water conveyance systems. Subd. 7 Vehicle tracking from the site shall be minimized with the use of stone pads, concrete or steel wash racks, or equivalent systems. 1500 - 8 City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance Subd.8 Street sweeping shall be used ifBMPs are not adequate to prevent sediment from being tracked into the street. 1530.03 Responsibility. The Permittee shall be responsible for proper operation and maintenance of all stormwater pollution controls and soil stabilization measures in conformance with best management practices and with the maintenance requirements in the NPDES General Construction Permit. The Permittee is responsible for the operation and maintenance of temporary erosion at the site. The Permittee is responsible until another Permittee has assumed control over all areas of the site that have not been finally stabilized or the site has undergone final stabilization, and has received an approved Certificate of Completion. The Permittee is responsible for maintenance, clean-up and all damages caused by flooding of the site or surrounding area due to in-place erosion or sediment control. Section 1540 - Enforcement 1540.01 Erosion and Sediment Control Permit Enforcement. Upon the receipt of a Non- Compliance Notice from the PWD, the Permitee shall undertake a corrective action. Subd. 1 Types of Corrective Actions. A. For Violations Contained on the Construction Site. Permitee shall complete clean-up and restoration within forty-eight (48) hours of receipt of the Non- Compliance Notice. B. For Violation Impacting Adjoining Property. Permitee shall develop and complete a clean-up and restoration plan within forty-eight (48) hours of receipt of a Non-Compliance Notice unless the affected adjoining property owner refuses Permittee access to the adjoining property. In all cases, clean-up and restoration shall be completed within seven (7) days of receipt of the Non-Compliance Notice, unless an extension is granted by the PWD. C. Violations Impacting Streets, Wetlands, or Water Bodies. Permittee shall develop and implement a clean-up and restoration plan immediately upon receipt of a Non-Compliance Notice. Subd.2 Failure to Comply. If Permittee fails to implement the Plan or complete any required corrective action in a timely manner, the City may pursue one or more of the remedies specified herein. All costs incurred by the City shall be paid by Permittee. Escrow funds may be used by the City for this purpose and, if such funds do not adequately cover the City's cost, the Permittee shall reimburse the City for any deficiency before continuing work on the construction site. The City may: A. Withhold the scheduling of inspections and/or the issuance of a Certificate of Occupancy. B. Revoke any permit issued by the City to the Permittee for the Site. 1500 - 9 City of Arden Hills Chapter 15 Erosion and Sediment Control Ordinance C. Direct the correction of the deficiency by City forces or by a separate contract. D. Obtain a Compliance Order from the appropriate court. Effective Date. publication. This ordinance will take effect and be in force after its passage and official Adoption Date Passed by the Arden Hills City Council this 14th day of July, 2008. Stanley D. Harpstead, Mayor ATTEST: Ronald J. Moorse, City Administrator 1500 - 10 CITY OF ARDEN HILLS COUNTY OF RAl\1SEY STATE OF MINNESOTA SUMMARY OF ORDINANCE NO. 2008-009 On the 14th day of July, 2008, the Arden Hills City Council adopted Ordinance No. 2008- 009, and by at least four/fifths affirmative votes pursuant to Minn. Stat. ~412.191, Subd. 4, directed that a summary of Ordinance 2008-009 be published. Chapter 15 and its Subdivisions are collectively known as Ordinance 2008-009, entitled ""Erosion and Sediment Control Ordinance". The prilnary purpose of the amendment is to add Erosion and Sediment Control Regulations for Land Disturbance Activities to the City Code. A full copy of Ordinance 2008-009 is available for inspection by any person during regular business hours at the office of the City Administrator, 1245 West Highway 96, Arden Hills, Minnesota 55112. The Ordinance is also available online at http://www.ci.arden- hills.mn. us. June 18, 2008 Deb Bloom City Engineer, Roseville, Arden Hills, and Falcon Heights RE: Proposal for Erosion and Sediment Control Services for Arden Hills Introduction: The Ramsey Conservation District has a long-standing program history assisting local governments, within Ramsey County, manage and control soil erosion and sediment (E&S control). Over the past 35 years, we have worked with most local units of government and regional water management organizations, e.g., Rice Creek Watershed District (RCWD), to develop and implement E&S control measures to insure that land disturbance activities have minimal impacts on our water and storm water conveyance resources. We currently have three-registered/certified E&S control specialists on staffwith a combined professional experience of 34 years. The District also authored the Ramsey County Erosion and Sediment Control Handbook, which was adopted by most municipalities to establish a standardized approach to regulating E&S control. At the present time, the District has a contract with the Minnesota Pollution Control Agency (MPCA) to provide inspection services for all national pollution discharge elimination system (NPDES) permit sites within Ramsey County. As of June 15, 2008, there are over 150 active permit sites in Ramsey County. Proposal: The District can assist the City of Arden Hills implement an E&S control permit program in a very cost-effective/efficient manner. · Our headquarters is the Ramsey County Public Works Campus. · Weare constantly driving through Arden Hills to perform work throughout Ramsey County. · We have a highly experienced and skilled staff in the field of E&S control. Page Two- · We can insure coordination of City permits with RCWD and the MPCA NPDES permits. For our service, we would bill a flat rate fee of$56.00/hr, this will include any mileage costs, for providing office review and comment on E&S control permit needs and perform as many field inspections and reports as are necessary to insure compliance with City rules. We would also charge a $42.00 per hour clerical services rate for any billing/clerical services associated with this function. I would anticipate that this cost would be very minimal, i.e., no more than one hour per billing cycle (a quarterly billing cycle would work for the District). We feel that charging an hourly rate for technical services allows our partners to better benefit from the efficiencies generated from our other inspection programs. We can be very flexible in the interaction with City staff/permitee and recording the necessary documentation. If you have any questions, please call me at the District office (65]-266-7272). Sincerely, Tom Petersen District Manager