Loading...
HomeMy WebLinkAbout7C, Motion to Authorize Staff to Contract with Bolton & Menk .. __LS Request for Council Action Prepared By: Kristine Giga, Civil Engineer Council Meeting Date: September 8, 2008 Motion to Authorize Staff to Contract with Bolton & Menk, Inc. to Prepare a Feasibility Report for the Future Snelling/Old Highway 10 Trail with Improvements to CP Rail Bridge for Pedestrian Crossing in an Amount Not to Exceed $6,200 Budgeted Amount: $75,000 Actual Amount: $6,200 Funding Source: Special Revenue Park Fund Recommendation: 1. Authorize Staff to Contract with Bolton & Menk, Inc. to Prepare a Feasibility Report for the Future Snelling/Old Highway 10 Trail with Improvements to CP Rail Bridge for Pedestrian 'Crossing in an Amount Not to Exceed $6,200 Supporting Documents: 1. Memorandum dated September 4, 2008 from City Staff. 2. Request for Quote scope 3. Proposal submitted by Bolton & Menk, Inc. ~ MEMORANDUM DA TE: September 8, 2008 TO: Mayor and City Council Ron Moorse, City Administrator FROM: Kristine Giga, Civil Engineer Deb Bloom, City Engineer Greg Hoag, Public Works Director SUBJECT: Future Snelling/Old High,va)T 10 Trail with Improvements to CP Rail Bridge for Pedestrian Crossing BACKGROUND The City of Arden Hills approved an ellgineering consultant pool on August 27, 2007 for use on specialized projects or projects that the City of Rose viI Ie's Engineering Department may not have the capacity to assist with. The City Council indicated a desire to study the CP Rail Bridge located on Old Highway 10 north of County Road E for potential improvements that would provide a pedestrian crossing under the bridge. In order to do this, a more global review needs to occur to determine the side of the street on which the trail should be located. A scope of work was prepared for the preparation of a feasibility report to evaluate the location of a future trail and alternatives for improvements to the bridge to accommodate pedestrians. City staff reviewed proposals submitted by the firms in its municipal engilleering pool, and is recommending Bolton & Menk, Inc. for this work. DISCUSSION Proposals were submitted by three of the four firms in the municipal engineering pool: Bolton & Menk, Inc., Kimley-Hom and Associates, Inc., and WSB and Associates, Inc. This contract will be a not to exceed cost based on actual hours spent on the project, with an optional additional \ \Metro- inet. us\ardenhills\PR&PW\Engineering\2008\Counci I_Actions 9-8-08 M elno _ CPRai I_F easibility .doc 9/4/2008 Page 2 cost to present the study results at a City Council meeting, a Parks, Trails and Recreation Committee meeting, and a public information meeting. The proposal amounts are listed below: Consultant Proposed Base Fees Meeting Fee (per each) Bolton & Menk $7,965* $400 Kimley-Hom $28,150 $1,233 WSB $29,496 $2,300 * Base fee reduced to $5,000 if awarded together with 2009 PMP project Staff recommends Bolton & Menk, Inc. for this work. Bolton & Menk staff is experienced in municipal projects, including trail design, and also has knowledge and a good understanding of the intricacies of working near lakes and wetlands. Bolton & Menk staff has worked on other projects that fall within the Rice Creek Watershed District~s (RCWD) jurisdiction, and is familiar with their rules and requirements. Bolton & Menk has also recently been working with the City on other transportation related projects; City staff has had a positive experience with this firm and feels the proposal that has been submitted best meets the intent of the project and the City~ s needs. FINANCIAL IMPLICATIONS The costs to complete this feasibility report will be paid for out of the Special Revenue Parks Fund. The amount budgeted in 2008 for this study well exceeds the price of the proposal submitted by Bolton & Menk. Bolton & Menk has also indicated that if they are also awarded the 20(}9 PMP project, the base fee would be reduced to $5,000, given the close proximity oft~e two projects. Staff recommends including the optional costs of attendance at City meetings and determining at a later time whether or not to utilize this service. RECOMMENDED COUNCIL ACTION Authorize Staff to Contract with Bolton & Menk, Inc. to Prepare a Feasibility Report for the Future Snelling/Old Highway 10 Trail with Improvelnents to CP Rail Bridge for Pedestrian Crossing in an Amount Not to Exceed $6,200. Request for Quote: Feasibilitv Report for Future Snellin2/0ld Hi!!hwav 10 Trail with Improvements to CP Rail Brid2:e for Pedestrian Crossin!! The City of Arden Hills is seeking quotes to complete a feasibility report for a future trail along Snelling/Old Highway 10 from Trunk Highway 51 to County Road 96, including improvements to the CP Rail Bridge structure. GENERAL PROJECT SCOPE The City's Parks Trails and Recreation Committee (PTRC) includes a proposed trail along Snelling/Old Highway 10 as a major north-south trail connection in its pathway master plan. This proposed trail would cross under the CP Rail bridge located north of County Road E; improvements are needed at the bridge to accommodate a trail. A location map of this area is attached. The selected consultant shall complete a feasibility report for this project. The contract may be expanded in the future to include any of the following for the improvements to the CP Rail bridge: final design, construction administration, staking and observation. REQUIRED SERVICES DESCRIPTION The Consultant shall provide preliminary engineering services for the proposed project, including field reviews of the project site as necessary and preparation of presentation graphics and exhibits for public information. The Consultant shall prepare a feasibility report containing the project description, background information, engineer's estimate and recommendations. Wetland impacts are anticipated; the extent of impacts shall be discussed for the construction of a trail on both sides of the road. Estimated costs for filling, wetland avoidance and/or mitigation shall be included in the report, along with associated permitting requirements (Rice Creek Watershed District, DNR, Corps of Engineers, etc.) The report shall include an evaluation of impacts and associated costs, and make a recommendation on a trail alignment. A draft layout and cost estimates were prepared in 2004. The Consultant shall be review and discuss these in the feasibility report. Staff may ask the Consultant to present the report at a City Council meeting, Parks, Trails and Recreation COll1ll1ittee meeting, and a public information meeting. Three meetings shall be included as an optional cost in the proposal. PROJECT SCHEDULE The following is the proposed schedule for the project: 1. Submittals due: 2. City Council to award contract to consultant: 3. Kickoff meeting with City staff: 4. Completion of Feasibility Report: August 21, 2008 Septenlber 8, 2008 September 2008 November 2008 This schedule is approximate and is subject to change. PROPOSAL CONTENTS The proposals should include a project scope, project understanding, schedule, proposed design tealll, and a cost breakdown including hours, hourly rates and total costs. If resumes of staff on the proposed design team were not submitted with the Statement of Qualifications, June 2007, please provide with the proposal. The Consultant should provide a not-to-exceed total cost for the proposed project services. Please provide three copies of the proposal in letter format (not bound) by 4:00 P.M. Thursday, August 21, 2008. In an effort to save paper, please make double-sided copies and be concise with your response. Address submittals to: Kristine Giga, P .E. Civil Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112 The City reserves the right to reject any or all proposals at the full discretion of the City. 2 t' .. At E30 L. -,-OI'J & 1'-/1 E: I'J J< ~ Consulting Engineers & Surveyors 12224 Nicoltet Avenue · Burnsville, MN 55337- 1649 Phone (952) 890-0509. FAX (952) 890-8065 II'JC. August 21, 2008 Ms. Kristine Giga, P.E. Civil Engineer City of Arden Hills 1245 West Highway 96 Arden Hills, MN 55112-5743 Re: Request for Quotes Feasibility Report for Trail/CP Rail Bridge Improvements City of Arden Hills, Minnesota Dear Ms. Giga: Thank you for the opportunity to submit this proposal for the City of Arden Hills Feasibility Report for Trail/CP Rail Bridge Improvements. Bolton & Menk, Inc. is an eminently qualified fmn specializing in municipal improvements projects like this one for Arden Hills. Our success with these projects stems from our technical expertise and our commitment to customer service and client satisfaction. We are confident that this combination of expertise and our dedication to understanding and meeting the specific needs of the City will make Bolton & Menk, Inc. a valuable partner to Arden Hills as you look to successfully and cost efficiently complete this proj ect. To serve the City of Arden Hills, we have assembled a project team that will be lead by me, a Senior Project Manager and Associate Engineer with Bolton & Menk, Inc. Our project team that we have assembled has completed sirr.J.lar studies for numerous comlIlunities. OUf team's approach to municipal engineering focuses on creative thinking and alternatives analysis, and cost-effective design and infrastructure solutions that possess longevity and low maintenance. To ensure our commitment to customer service, our objectives for this priority project are to completely understand the City's goals; clearly communicate our recommendations and proposed solutions; and be readily available and immediately responsive to your requests for information. We have organized our enclosed proposal to coincide with the requirements of your Request for Quotes. We look forward to working with you and the City of Arden Hills on this project. Please call me at (952) 890-0509 if you have any questions. Sincerely, BOLTON & MENK, INC. ~6L, '7tI(U~ If- (k(/tMCA.-t... Marcus A. Thomas, P.E. Associate Engineer Bruce D. Firkins, P.E., L.S. Vice President/Civil Division Manager MANKATO, MN · FAIRMONl MN · SLEEPY EYE, MN · BURNSV1LLE, MN · CHASKA, MN WllLMAR, MN · RAMSEY: MN · AMES, tA www.bolton-menk.com An Equal Opportunity Employer PROJEC'T UNDERSTANDING According to the City of Arden Hills August 6, 2008 Request for Quotes, the City is seeking professional engineering services to complete a feasibility report for a future trail with improvements to the CP Rail Bridge along Snelling Avenue/Old Highway 10. The trail corridor begins at Minnesota State Highway 51 and runs north to Ramsey County Road 96. Snelling A venue between TH 51 and County Road E is a City street and Old Highway I 0 from County Road E to County Road 96 is a County road. A trail along this corridor will provide a pedestrian corridor for area residents, Bethel College and area parks. In general, the City's engineering consultant will be required to complete a feasibility study and report. The feasibility study will include a project description, background information, engineer's estimate and recommendations. The study will also discuss anticipated wetla~d impacts, wetland mitigation and associated permits. In addition, the study will evaluate the estimated costs associated with identified wetland impacts. PROJECT SCOPE & APPROACH According to the City of Arden Hill's Pathway Master Plan, a trail is proposed along Snelling Avenue/Old Highway 10 as a major north-south trail connection. The proposed trail will follow the street alignment on either the east or west side of the road and cross under the CP Rail bridge located north of County Road E. Bolton & Menk will evaluate two (2) alternatives for the trail construction. The first alternative will be along the west side of Snelling A venue/Old Highway 10. The second alternative considers construction of a trail along the east side of Snelling Avenue/Old Highway 10. Each of these alignments is illustrated on the Key Issues Maps included with this proposal. OUf evaluations will assess the feasibility and costs of each alternative, including their constructability, wetland impacts and mitigation requirements. For this study, we will utilize existing base maps and contour infonnation available from the City. Bolton & Menk has initiated preliminary discussions with Rice Creek Watershed District (RCWD). RCWD representatives recommend meeting during the preliminary design phase to discuss design issues, wetland impacts., wetland mitigation and infiltration requirements due to the addition of ilupervious surface. Bolton & Menk intends on continuing these discussions with RCWD personnel during the preliminary design. A primary objective of this feasibility study will be to assess and compare the benefits and challenges presented by a trail alignment along either the east or west side of the roadway corridor. The following are special concerns and considerations, as summarized on the attached Key Issues Maps., which need to be addressed in evaluating these trail alternatives: ~ Evaluate trail constructability along steep embankments. ~ Evaluate trail constructability along ditch sections. ~ Evaluate need for retaining walls. ~ Evaluate wetland impacts. ~ Identify appropriate wetland mitigation efforts. ~ Minimize impacts to existing rain gardens. ~ Minimize tree clearing impacts. ~ Coordinate work under railroad bridge with the CP Railway. ~ Identify permitting requirements for construction of trail under 1-694. ~ Evaluate potential for specialty trail design to avoid lake impacts. ~ Evaluate feasibility of trail construction adjacent to Highway lOin regards to clear zone requirements, ditch requirements and state highway right-of-way. ~ Evaluate potential for utilizing a paved shoulder design as a dedicated bike lane for "high impact" segments along the trail corridor. ~ Identify the feasibility of a dedicated bike lane or separate trail crossing at Bridge No. 4627 north of TH 5 1. ~ Identify Rice Creek Watershed District, DNR and Corps of Engineers permitting requirements. ~ Conduct preliminary design review meeting with Rice Creek Watershed District ~ Identify MnDOT permitting requirements. ~ Identify County permitting requirements. ~ Other environmental and miscellaneous issues identified by the project team and stakeholders4 Bolton & Menk will review the draft layout and cost estimates prepared by the City in 20044 We will discuss the potential of this alternative in our feasibility report. Bolton & Menk understands that there are multiple stakeholders and interests influencing the trail alignment, and we are committed to objectively evaluating the options and recognizing the need to balance pedestrian needs, engineering and construction requirements and costs. At the request of City staff, our Senior Project Manager and Project Engineer will be available to present the findings of the preliminary engineering report at a City Council meeting; Parks, Trails and Recreation Committee meeting; and a public information meeting. PROJECT SCHEDULE The following project schedule is proposed: Council Award Project. 04 .......... ....440........... ............... ........ ..4H............ ............ .......... ...... September 8, 2008 Kick-off Meeting w/City Staff...........H............................................................ Week of September 8, 2008 Design review meeting with RCWD................................................H.................. Week of October 6,2008 Submit Draft Feasibility Report for City Review...................................................H.....HHOctober 10, 2008 Meeting with Parks, Traits and Recreation Committee* ........................... Between Oct. 10 - Nov. 3, 2008 Public Information Meeting* ......4...............................04.04......................... Between Oct. 10 - Nov. 3, 2008 Sub m it Fin a I F eas i b i I i ty R e po rt ........ 4 . . . . . . . . . . . . . . .4 . . . . 4 . . . . . . . . . . . . . . . . . . . . 4 . . . . . . . . . . . . . . . .4 . . . . . . . . . . . . . . . 4 . . No v e m be r 3, 2008 Present Feasibility Report at City Council Meeting* ...............................4.......................... November 2008 *80lton & Menk is prepared to adjust the proposed meeting schedule as necessary to meet the City of Arden Hills' needs. PROJECT DESIGN TEAM It is the policy of Bolton & Menk, Inc. to staff all major projects by utilizing a team approach, with close coordination between the client and the team maintained at all times. This proposed team will report directly to designated City of Arden Hills Staff. We strive to provide the best team services possible, with the team specifically tailored to meet the needs of the client. Following are brief profiles of each of the team members. A resume for Travis Winter, P.E. and Lee Stallings and Joe Litman (LHB - Structural Engineer) which were not included in our general consulting services SOQ, are also attached. PRINCIP AL-IN-CHARGE Bruce Firkins, P.E., Bolton & Menk's Vice President, will serve as the Principal-In-Charge for this project. Mr. Firkin's responsibilities to this project include contract administration as well as overall quality assurance and quality control. Throughout this project, he will be available to the City of Arden Hills, in addition to the Senior Project Manager, to discuss the project team's overall performance. SENIOR PROJECT MANAGER Marcus Thomas, P.E., will serve as the Senior Project Manager and primary contact to the City of Arden Hills. Mr. Thomas will be intimately involved with all aspects of the project He will provide overall technical supervision, administration and coordination of the project He will make recommendations, review the quality of the work and monitor the progress of the project. He will give daily direction to the project team to ensure that all project goals are met. He will attend all project and public meetings as required by the City and lead any public presentations as required. PROJECT ENGINEER Travis Winter, P.E., will complete the preliminary design and preliminary engineering report under the direction of the Senior Project Manager. Mr. Winter will also be directly available to the City as required and win assist Mr. Thomas \vith public presentations and meetings. WATER RESOURCES ENGINEER Lani Leichty, P.E., will assist the team in identifying potential wetland or other surface water impacts and will prepare recommendations and cost estimates associated with anticipated mitigation efforts. ENGINEERING TECHNICIAN Lee Stallings, a Senior Technician with Bolton & Menk, Inc., will serve as the Engineering Technician for the project. Under the direction of the Senior Project Manager, Mr. Stallings will work closely with the Project Engineer in generating exhibits and presentation materials required throughout the project. STRUCTURAL ENGINEER Joe Litman (LHB Engineers), will serve as the Structural Engineer for the project. Mr. Litman has 20 years of experience in dealing with bridge, retaining wall and structure improvements. Mr. Litman will review all significant recommendations relative to the CP Rail bridge modifications, major retaining walls or structurally-supported trail segments. T.;.:... RA.. ' .,' VIS WINTER P.E.... . -... -...,. : .. .- .-.-.. -,. ......,...-, Project Engineer EDUCA TION Bachelor of Science Degree Civil Engineering North Dakota State University Fargo, NO SUMMARY Mr. Winter is a Project Engineer for the Bumsville Office of Bolton & Menk, Inc. For the past 5 years, Me. Winter has worked as a design engineer and construction observer with municipal engineering design and construction phase experience. REGISTRA TION Registered Professional Engineer, Minnesota Me. Winter~s experience includes a variety of engineering tasks including preparation of Preliminary Engineering Reports~ preparation of Plans and Specifications and preparation of cost estimates. On-site construction duties typically include observing the contractor to assure that the improvements are being constructed in general conformance with the plans and specifications. Other responsibilities include maintaining a daily diary, measurement of completed quantities, preparing pay estimates, tracking project schedules, coordination of construction staking and materials testing, and maintaining day-to-day communication with the client, contractor and property owners affected by the project. ORGANIZA TIONS American Society of Civil Engineers National Society of Professional Engineers Minnesota Society of Professional Engineers His experience includes working on various new construction projects as well as reconstructs for the cities of Eagan, Northfield, Hampton, Empire, Marshall, Springfield, and Bird Island. MN/DOT CERTIFICA TIONS Aggregate Production I Bituminous Street I & II Concrete Field I Grading and Base I & II Erosion/Sediment Control · Design ofSWPPP EXPERIENCE The following are projects for which Mr. Winter has performed design engineer services: 2008 Water Street Parking 15th Street Enhancements and Reconstruction, Northfield, MN Construction cost for this project was over $1.7 million., it involved reconstructing three blocks of the downtown area in Northfield. Along with full utility and street replacement, surface improvements included streetscape enhancements, pedestrian promenade construction, Cannon River edge improvements, pervious pavers, and pervious asphalt pavement. 2007 MSA Project, Northfield, Minnesota This project involved reclaiming and overlaying over a mile of streets that are in the city's Municipal State Aid network. The project also involved replacement of 1,500 feet of trunk watermain along portions of the project streets. 2006 5th Street Improvements, Northfield, Minnesota Mr. Winter was a Design Engineer on this five block street and utility reconstrl!ction project The project involved fulJ replacement of street surface, curb an<i u watermain, (1nds TRAVIS WINTER, P .Ei. Project Engineer 2006 Street & Utility Improvements, Mountain Lake, Minnesota This $2million reconstruction project consisted of the design of improvements to sanitary sewer, storm sewer, watermain, raw watermain, curb and gutter, and bituminous street pavement. Mr. Winter was the Design Engineer on this project. 2006 Street & Utility Improvements, Springfield, Minnesota Mr. Winter was the Design Engineer on this $2million reconstruction project, which consisted of the improvements to sanitary sewer, storm sewer, watermain, raw watermain, curb and gutter, and bituminous street pavement. North Highland Avenue Improvements, New Vim, Minnesota This was a $5 million federally funded project for a new four-lane divided collector street. It included the design of 10,000 feet of curb and gutter, sanitary sewer, watennain, storm sewer, storm treatment ponds and bituminous pavement. 2005 Street & Utility Improvements, Bird Island, Minnesota This $11 million Rural Development reconstruction project consisted of reconstructing approximately eighty (80) blocks of city streets. It included the design of 49,000 feet of curb and gutter, sanitary sewer, storm sewer, watermain replacement and bituminous street reconstruction. Mr. Winter served as a Design Engineer for this project. 2004 T.H. 212 Frontage Road, Olivia, Minnesota This O.S-mile project was a new street design. It included the design of curb and gutter, stonn sewer and bituminous pavement 2004 Street & Utility Improvements, Waverly, Minnesota This reconstruction project consisted of reconstructing 5 blocks of existing citej streets. Included in the project design for Mr. Winter were curb and gutter., sanitary sewer, \vatermain, storm sewer and bitulninous street reconstruction. 2004 County State Aid Highway, No.9 (Atlantic Avenue) Reconstruction, S.A.P. No. 86-609-13, Waverly, Minnesota This State Aid reconstruction project consisted of reconstructing 6 blocks of C.S.A.H No.9. It included design of curb and gutter, storm sewer replacement and bituminous street reconstruction~ 2004 Sleepy Hollow Improvements, Sleepy Eye, Minnesota Mr. Winter served as Design Engineer and Construction Observer for this residential subdivision project. The following are projects for which Mr. Winter performed construction observation services: 2008 Street and Utility Improvements, Eagan, MN Over four miles of major arterial and local collector streets \vere edge milled and overlayed on this $2 million dollar project Six blocks ofwatermain and sanitary sewer were also reconstructed as a part of this project. TRA VIS WINTER, P .E. Project Engineer 2005 Parkway Addition II Improvements, Marshall, Minnesota An 82-lot subdivision, this project was $2.5 million and included 9,000 feet of curb and gutter construction, site grading, sanitary sewer, watermain, storm sewer and bituminous pavement construction. 2005 Raw Watermain Improvements, Redwood Falls, Minnesota This project included replacing t mile of the city's raw water line~ 2004 Riverside Park Lift Station and Forcemain Upgrades, Springfield, Minnesota This was a $250,000 reconstruction project that included sanitary sewer replacement and rehabilitation of a lift station. 2004 Wastewater Aeration Pond Piping Replacement, Redwood Falls, Minnesota This reconstruction project included replacement of the aeration piping for the Redwood Falls community's wastewater treatment ponds. 2004 Watermain Improvements, Lucan, Minnesota This was a $250,000 Rural Development reconstruction project. It included replacement of segments of the communities' water system by trenchless installation. Some additional tasks involved with this project included: filing weekly progress reports, conducting weekly progress meetings with the contractor, Rural Development Association staff and city officials. 2004 Lower Sioux Community Addition Improvements, Lower Sioux Community, Minnesota This reconstruction project included replacement of sanitary sewer, watermain installation and bituminous surface construction. 2005 Fairfax Street & Utility Improvements, Fairfax, Minnesota This $200,000 reconstruction project included sanitary sewer, watermain, storm sewer, curb and gutter and bituminous street reconstruction. 2004 Southeast Development Improvements, Redwood Falls, Minnesota A rehabilitation project, it included extending sanitary sewer and watermain in preparation for a new residential subdivision. LEE STALLINGS - .- Senior Engineering Technician EnUCA TION Twenty Years U. S. Air Force Engineering! Surveying Construction Management SUMMARY Mr. Stallings is a Senior Engineering Technician and has been working in the Engineering and Surveying field since 1970. His professional ability is evident by the diversity of the projects for which he has provided design, plan preparation, construction inspection and limited project administration. These projects include rural and urban roadways, ,water and wastewater treatment facilities, rural and municipal utility systems and water supply development. Advanced AutoCAD Eagle Point Product Training North American School of Conservation Wang Computer Systems Administrator EXPERIENCE City of Hopkins: 2001-2008 Street and Utility Improvements City of Chanhassen: 2006-2007 Street and Utility Improvements City of West St. Paul: 2006 & 2008 Street and Utility Improvements City of Burnsville: Judicial RoadNalley View Drive Street and Utility Improvements City of Elko: Xerxes Avenue Street and Utility Improvements City of Hastings: Fourth Street Reconstruction General Sieben Drive Reconstruction Lock & Dam Road/Traillmprovements Century South Trunk Sanitary Sewer and Watermain Extensions City of Jordan: 2002 Street and Utility Improvements City of Northfield: Jefferson Road Extension II Second Street Reconstruction LEE STALLINGS Senior Engineering Technician City of Northfield: Jefferson Road Extension II Second Street Reconstruction Hennepin County: CSAH 6 I Reconstruction Scott County: CSAH 44 Highway Improvements CSAH 27 Highway Improvements CSAH 2 Reconstruction City of Red Wing: Hay Creek/Riverfront Trails Le Sueur County: CSAH 15 Reconstruction PROPOSED FEES In accordance with the City of Arden Hills' project requirements, Bolton & Menk proposes to complete the scope of work as described above on an hourly basis for a cost not to exceed $7,965. If requested to attend a City Council meeting; Parks, Trails and Recreation Committee meeting; or a public information meeting, the additional cost for each meeting would be $400. The attached spreadsheet illustrates the cost breakdown including hours, hourly rates and total costs. Recognizing the proximity of the trail to the Glenarden neighborhood along with the efficiencies of completing the feasibility studies concurrently, Bolton & Menk proposes to complete this feasibility study for $5,000 if awarded along with the Glenarden project. GO 0 0 r:/) N ~ tr) \C ~ ~ ......... 00 N 0'\ <0r- a tr) N E- ......... GO Me: e: C'j -E :Q 0 0 Q) C N M -~~ Z c Q) UJE- -< r/) Q) ~ u 3 t ~ Q) ~ ~ 'Sn \C \0 1-c C QJu.:l ~ C\j r.FJ ~ E- ~ Z ;.... Q) LU Q) ~ c 0 '@) \0 LU c V) 0 > u.:l 00 N M N VI ~ +-' 0 U Q) eG .~ ~ ;.... ~~ ~ ~ U wE- ~ [/)00 .~ ~ eGO[/) 1-c M 1'"""l ~ C'j ~ M ~ ~ ~:J-(.l..l o~ ~ o~z COz 'c ~ ~ ~=7~~ ~ V'1 -< ~ Z <C . OcGr/) ~ c[/)~..J ~eGu~ ~ u.J"':c o.....J ~O~Z ~ UJcGUJ ~E-E-O ~ ~~~~ ~_O~ ~E-LL..o f2E->- 00 cGE- rJJ. 0_ ~ ~ BJU ~ ~ 0 ~ >- -< ::= .~ t- E- ...J :3 0 V'1 C-' e" < c.w Z Z ~ ~ co ;z ~ E= 0 [/) ~ ~ ~ 'J'1 W;J ~ ~ U ;z W;J ~ LU vf 0 Z ~ u... ...J c ~ - ~ ...J 0 C-' t;-. 53 -.:: ~ ;z t;-. C-' ~ W;J 0 ;z ~ [/) -i: ~ E= z E- y ~ >- u c.w Z l:I:l a:= ~ 0 0 ~ 'J'1 g c.w Q ~ < ~ ~ ~ ~ >- z ~ ~ UJ l:I:l ~ ~ r- f- C-I.. > = U 0:: 0 0 1-- Q ::3 ~ 0 ., ~ >- cG ~ ...J 0 Q. I. W;J E- o.... 0 W;J " ct: ~ ~ ~ .... u ~ Q. c- o ;z c:: Q Q Q ~ ~ M ~ ..; ~ l:I:l U = Z u.:l r- UJ -, 0 :J 0::: U ~ z ~ ~ ~ ~ ~ o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ rJl ~ ~ ~ ~ u ~ ~ o ~ ~ r:/) f- Z Cl.J ~ u.J > o C!: ~ ~~ c.r.JE-- 00 Qr:/) ~L.I..J C!:z CO2 -J- ~=<~ ~~~ ~c..-J \.)~:r: ~~Z ~~gs ~E-ccG cG<r: O~ ~O E-c~ C!:f--. 0___ ttu cG ~ E-c :J ~ CO ~ r:/) <r: u.J ~ co o o ~ ~ N 00 u .~ ~ 1-. bl) 0.. :d 5 ~ '2 :E Q) V'J. V'J. E- Z U.l 2 U.l > o ~ ~ LU o o C2 co ......J :;: ~ ;r: U 5 :J r:/) :;: UJ ~ ~ f- ~ 5 r:/).... u.... ......J E- d ~ :r: ~ ~ ~ o >- ~ f- -< :J 6 05 >- ~ f- ~ U u.... ~ ~ u z UJ UJ ....., ::J ~ U 0.. ~ ~ ~ [) ~ ~ 1) ~ 5's ~ rrJ ~ ~UJ 1-. ~ ~ '~.s L-o on 0.. c LU Q Q d QO "l ~ fA rJ:J. Z 2 E-c ~ o ~ 00 ~ :> z Q ....J ~ ~ o o o f;A o ~ N M \0 f;A o o 6 f;A o z ~ ~ ~ Z o Z ~ ;;.. ~ ~ Z ~ :3 ~ 0= Q. o o 6 ('"") \0 f;A o ~ V) t- Q'\~ f;A o o ~ 00 ~ GA o z ~ ~ ~ ~ ~ '- o ~ u ~ E-c U ~ ~ o ~ Q. ~ rJ:J. ~ Q Q Q ~ ~ M f"'i ~ E-c g g g g g N 0\ 6 ~ .,) ~~~~ \C) f;A ~.-. f;;7 N" 0'\ GA GA ~ fA o 0 0 0 o 0 0 0 606 6 f;A 00 GA f;;7 ~ f;;7 ~ ~ 0\ "-.: ~ ~ ~ .....: ~ ....... ~ ~ ~ ~ '"' ~ ~ ~ o o 6 f;;7 o ~ t- M M GA o ~ M ...0 M ~ o o o GA Q Q d ~ \0 fA o o 6 00 ~ f;;7 Q Q ~ ~ ~ ~ fA o o ~ 00 ~ ~ Q c:: ~ f") ~ ~ fA rJl ~ ~ ~ ..J < ~ o ~ o z E= C2 $ E-c ~ o Q. tor;;l " Professional Profile Registration Licensed Pro fessional Engineer in IvIinnesota Education Bachelor 0 f Science in Civil Engineering~ University 0 f ]\Tinnesota Certified Bridge Inspection learn Leader Affiliations .A.lnerican Society of Civil Engineers - Duluth Section~ Past President L.ake Superior College i\dvisory Board Awards Grand l\\vard fron1 the l\merican Council of Engineering Companies of 1\;Iinnesota (A.CEC/iv'lN) for 'I'H S3/ Piedmont [\venue Grand i\\vard from the l'-\merican. Council 0 f Engineering Companies of rvlinnesota (l\CEC/IvfN) for i\t{inn l'ac Bridges ~ederal High\vay i\dmit1istration "Excellence in Highway Design" award for the Trunk High\vay 61 reconstruction project in Schroeder, ]\'linn. including the renovation of the Cross River Bridge www.LHBcorp.com Joseph D. Litman, PE Principal Structural Engineer \~lith 20 years of experience, Joe serves as the manager of LJ-IB's Structural Department, specializing in the management and design of civil and structural projects. His responsibilities include all facets of project coordination and design. Joe's design experience encompasses all facets of civil engineering projects~ including state and county highways, municipal roadways, sanitary and storm se\ver systems, and site development. His civil construction administration kno\vledge includes inspection and staking in accordance \vith ]\:{n/DOT and Ff-{\~lA construction requirements. Joe's structural design experience includes design for residential, conunercial, and industrial buildings as \vell as extensive experience in bridges and parking structures. He is \vell versed in the design of steel, concrete, timber precast/ prestressed and post-tensioned structures. He has led the project design on projects ranging from multi-million dollar industrial structures to smaller-scale historic structure renovations. Joe takes an active role in foUo\ving projects through construction. His sound understanding of design and construction processes ensures effective communication so desired outcomes are achieved bet\veen designer, o\vner, and contracto r. Project Experience · Glen Road Interchange Bridge No. 82029, single span steel plate girder interchange GU11p \vith curved girder flares and tall abutn1ents, and No, 82031, continuous span steel pb.te girder interchange ramp \\llth curved girder flares and tall abuttnents; N e\vport, t\/Urm. · Bridge Nos. L8S02, L8504, L8505~ L8S06, L8508 historic bridge rehabilitation of stone and concrete structures, and Bridge Nos. 69671 and 69672 bridge replacements on Seven Bridges Road; Duluth, J\linn. .A.erial Lift Bridge Rehabilitation, $6.5 million rehabilitation of 400-foot steel verricallift truss; Duluth~ Ivllnn. · Chester Creek Bridge Rehabilitation, concrete slab \vith stone abutments; Duluth, 1\linn. · Cross River Bridge Rehabilitation~ prestressed beam span; Schroeder, J\finn. · Bridge No. 69636, Skyline Parkway over I(eene Creek, concrete slab span; Duluth, i\linn. · Oliver Bridge Rehabilitation Project, 1900-foot-Iong steel structure spanning the lo"\ver St. Louis River for the D1\I&IR. Rail\vay Company; Duluth, 1\lino. to Oliver, \"\/is. · Bridge No. 69123 Skyline Road at Piedmont .L'-\venue, three-span haunched steel girder; Duluth, ivImn. · usx rvlinntac ivline Haul Road Conversion including design for t\vo three-span prestressed beam bridges and a four-span steel railroad bridge service; Lv{ountain Iron, tv'Iinn. · In-service Inspection and Repair Recommendations for United States Forest Service Bridges, approximately 100; ivlinn. and Ill. · DECC Parking Facility, new four-story., GOO-space, post-tensioned concrete parking structure; Duluth, IvIinn. · Technology Village Parking Structure, 700-car post-tensioned concrete parking structure including a drive-through auto bank and connecting sky\valk system to adjacent buildings; Duluth, 1\1inn. Publications H Creating Durable Parking Structures for the Harsh rvIinnesota \Vinters" and .1 E<~t1d- Run Scheduling to beat the \X!eather, Cast-ill-Place Post-Tensioned Concrete is the Economical Choice," Co-presenter, ...r\SCE Cold Regions Conference 1998. .of Ma p Document: (\ \a rcse rver1 \gis \ARDHL Proposals \Old Snelling A venue \ESRI \Maps \Key Iss ues Map Wes tside -11 x 17 . mxd) 8/21/2008 -- 1 :54:41 PM FEASIBILITY STUDY FOR FUTURE TRAIL/ CP RAIL BRIDGE IMPROVEMENTS BAST SJDBALIGNMBNT JICBYISSUBS MAP Legend ---- Future TraiJ Corridor ~ CP Rail Bridge o Lakes (,1 City Limits Source: Ramsey County, Met Council, MnOOT, MnDNR o 1 ,500 I Feet